Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
14 February 2023 
SUPPLEMENTARY PACK 1 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE - BY MICROSOFT
TEAMS on WEDNESDAY, 15 FEBRUARY 2023 at 11:00 AM 
I enclose herewith supplementary reports for items 4, 6 and 9 on the Agenda for the above
meeting. 
Douglas Hendry
Executive Director 
SUPPLEMENTARY REPORTS 
4. ROSNEATH FARMS LTD: SITE FOR THE ERECTION OF DWELLINGHOUSE:
PLOT 7, LAND TO THE REAR OF LOCHEWE AND ARDLANISH, KILGREGGAN,
HELENSBURGH (REF: 21/00349/PPP) (Pages 3 - 6)  
Report by Head of Development and Economic Growth 
6. THE SCOTTISH GOVERNMENT ON BEHALF OF ENERGIEKONTOR UK LTD:
ELECTRICITY ACT SECTION 36 CONSULTATION RELEVANT TO ROWAN WIND
FARM: LAND APPROXIMATELY 4.5KM NORTH WEST OF TARBERT, ARGYLL &
BUTE (REF: 22/00385/S36) (Pages 7 - 10)  
Report by Head of Development and Economic Growth 
9. THE SCOTTISH GOVERNMENT ON BEHALF OF DRAX CRUACHAN EXPANSION
LIMITED: ELECTRICITY ACT SECTION 36 CONSULTATION RELEVANT TO
CONSTRUCTION AND OPERATION OF NEW UNDERGROUND POWER
STATION AND ASSOCIATED INFRASTRUCTURE ADJACENT TO CRUACHAN 1
TO PROVIDE UP TO 600 MEGAWATTS (MW) OF ADDITIONAL NEW
GENERATING CAPACITY: CRUACHAN POWER STATION, LOCHAWE,
DALMALLY (REF: 22/01221/S36) (Pages 11 - 12)  
Report by Head of Development and Economic Growth 
Public Document Pack

Page 2

Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Jan Brown
Councillor Audrey Forrest Councillor Kieron Green (Chair)
Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Willie Hume
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Peter Wallace   
Contact: Fiona McCallum, Committee Services Officer                  Tel. No. 01546 604392

Page 3

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:   21/00349/PPP
Planning Hierarchy:  Local Application
Applicant:   Rosneath Farms Ltd
Proposal: Site for the erection of dwellinghouse 
Site Address: Plot 7, Land to the rear of Lochewe And Ardlanish, Kilcreggan,
Helensburgh, Argyll And Bute
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to make Members aware of additional representations that have
been received on 13th February 2023 in relation to the main report on the agenda.
The applicant’s agent has submitted a short supporting statement in response to this issue. 
2.0 ADDITIONAL REPRESENTATIONS
Members are advised that two additional objections have been received subsequent to the
publication of the Agenda.
As such, an addendum is required to Section (F) – Representations, in the main report.
“A total of 14 representations have been received.
Twelve of these object to the proposed development and two are classified as
representations.” 
The additional two objections are set out below; -
 Roger Mitchell – No address provided – Objection
 Jean Mitchell – No address provided – Objection. 
A summary of the issues raised is as follows:
 Fire risk to the proposed development and existing houses on the basis that the proposed
access is not wide enough for a Fire Pump Appliance to gain access; and, low pressure in
the water pipes at the only two Fire hydrants in the area. 
Page 3 Agenda Item 4

Page 4

Comment: - Fire safety has been raised by previous contributors and this is reported in the
main report. However, clarification of the Officers’ response may be helpful. It is noted that
the Area Roads Engineer has not raised any objections with regard to the private access
driveway subject to planning conditions. Council Building Standards has advised that the
minimum requirement for fire vehicle access, with regard to Building Regulations, is 3.7
metres width between kerbs and 3.5 metres at gateways in order to provide access for fire
vehicles to within 45 metres of the front entrance to the proposed dwellinghouse. The
agent has confirmed that a topographic survey shows the very narrowest point of the drive
as 6.2 metres. On this basis, as set out in the main report, Officers do not consider that
access for fire vehicles is a constraint to the approval of planning permission in principle. 
 Existing houses already experience low water pressure during the day during peak hours
of usage. 
Comment: - This issue has been fully assessed in the main report. No further comment is
appropriate. 
 Gravel is regularly taken from the beach in Meikle Bay in front of Mr Calderwood’s farm
which he uses to make the beds for the tracks and roads on his Farm causing coastal
erosion of the banks of the Clyde Estuary. 
Comment: - This is not a material planning consideration that can be afforded any weight
in relation to the assessment of the current application. This allegation may be investigated
as potential unauthorised development as a procedurally separate matter from this
assessment. 
 The landowner has sited a large manure pile (only one field down from this site) that
leaches effluent down over the lower field to the beach and back into the Clyde estuary. 
Comment: - This issue is not material to the assessment of the current application for
planning permission in principle for the erection of a house on the application site.
Concerns regarding potential pollution of waters from agricultural operations on adjacent
land should be taken up the Scottish Environment Protection Agency (SEPA). 
 Concern regarding a future application for the Council to adopt the present service road
running down from the B833 to ‘Portkil’ hamlet. It is getting broken up with pot holes due
to all the heavy contractors’ vehicles. No one will pay for the up keep of the road should
the council take it over on the basis of an agreement that access is free for all residence
living south of the B833. 
Comment: - Access to the site via the existing public/private road regime has been
assessed in full within the main report. Potential requests for the private road to be adopted
by the Roads Authority in the future is not material to the assessment of the current
application. No details are given with regard to the agreement referred to by the
contributors. It is likely that this refers to a private agreement with the landowner however,
as advised, this is not material to the current application. 
3.0 SUPPORTING STATEMENT
Page 4

Page 5

The applicant’s agent has submitted a brief supporting statement in response to issues of
fire safety, as reproduced below:
“A topographic survey shows that the very narrowest point of the drive is 6.2 metres.
The minimum width of access required for a fire engine in 3.7 metres. The final design
proposals will be fully compliant with the technical standards with regard to distance,
axle load, access, reversing of vehicles etc. and will obviously addressed during the
building warrant application.” 
4.0 ASSESSMENT
The late objections do not raise any new material planning considerations over and above
those set out, and fully assessed within the main report.
It is noted that several other issues are raised relating to beach erosion and potential pollution
from agricultural operations. These issues, where material to planning, may be investigated
separately from this application however they are not material to the current assessment.
As such the material planning considerations raised in these two representations do not
warrant a departure from the recommendation in the main report. 
5.0 RECOMMENDATION 
1) Planning Permission in Principle be approved subject to planning conditions as set out in
the main report. 
2) The supplementary report be noted. 
Author of Report: Norman Shewan      Date: 14th February 2023
Reviewing Officer:  Howard Young    Date: 14th February 2023 
Fergus Murray 
Head of Development and Economic Growth 
Page 5

Page 6

This page is intentionally left blank

Page 7

Argyll and Bute Council  
Development and Economic Growth       
This Supplementary report is a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit (ECDU) Section 36 consultation on the
proposed Rowan wind farm on Land Approximately 4.5km North West of Tarbert, Argyll
& Bute
_________________________________________________________________________     
Reference No: 22/00385/S36     
Applicant:       The Scottish Government on behalf of EnergieKontor UK Ltd
Proposal:  Electricity Act Section 36 consultation relevant to Rowan Wind Farm  
Site Address:  Land Approximately 4.5km Northwest of Tarbert, Argyll & Bute  
________________________________________________________________________   
SUPPLEMENTARY REPORT NO. 4 
1. INTRODUCTION 
Since completion of Supplementary Report 3, the Applicant has raised several concerns and
asked that they are addressed by means of a Supplementary Report. 
2. CONCERNS RAISED BY APPLICANT 
The Applicants concerns about Supplementary Report 3 may be summarised as follows: 
 The Applicant was naturally disappointed to note that the Council have introduced a
(potential and perceived) regionalised cumulative effect as a primary reason for objection
to the scheme.  They respect the concerns the Council have around Sheirdrim and Rowan
(whilst not agreeing on the balance or acceptability), however, as per the EIA Report, the
main contributor to these effects, particularly on Dun Skeig, is Sheirdrim and not Rowan. 
Officer Comment: Officers have been consistently clear on the major cumulative effects
that would be associated with the combination of Rowan wind farm and Sheirdrim
Renewable Energy Development. This position has not changed. What has changed is
that, following further consultation with the Council’s Landscape Consultant and
reconsideration against NPF4, the reason for Objection has been revised to focus on the
regional impacts of the proposal rather than regional and localised impacts. These impacts
are not new. 
 Like the aviation position, whereby the Applicant is very confident of the fact that both
NATS and GPA (Glasgow Prestwick Airport) objections can and will be lifted, and this is
acknowledged via text within the Committee Report that if these are lifted then the
Council’s objection would be also, they note that there is no corresponding position on
Sheirdrim. The Applicant has a key concern therefore that Members only have the benefit
of the Council’s position under the worst case (and potentially unrealised) combined
cumulative scenario, with Sheirdrim and the Council’s Report is silent on the acceptability
Page 7 Agenda Item 6

Page 8

of Rowan as a proposal on its own merits. This requires to be addressed to give Members
the full account of where the Council stands should Sheirdrim be refused in the coming
months. 
Officer Comment: This matter has been addressed and has been included in the revised
recommendation.  It is recommended that the ECU be advised that if Sheirdrim is refused
the Council’s landscape objection would be withdrawn. 
 The Applicant also wishes to add that estimated timescales for a decision on Sheirdrim
are in the region of July to October based on discussions with the ECU. They are sure this
is already noted but worth stating – it is therefore entirely plausible that were the Council
minded to not object (either via Officers or Members) then it is the Ministers who would
have to consider this cumulative scenario for Sheirdrim where Rowan could be part of a
consented baseline. The Applicant would be confident that aviation objections would be
lifted before a Sheirdrim decision. 
Officer Comment:  The Council has been consulted by the ECU on Rowan. We must
therefore respond based on the current cumulative scenario. The current scenario includes
Sheirdrim Renewable Energy Development.  Sheirdrim Renewable Energy Development
must be considered in the cumulative assessment. The advice of the Council’s Landscape
Consultant is that Rowan is not acceptable when considered cumulatively with Sheirdrim.
To clarify, should Sheirdrim be refused, then taking into account the new policy context of
NPF4, it is now considered that Rowan would be acceptable from a Landscape & Visual
Impact perspective. 
 The Applicant has raised concern that the Energy Consents Unit will not await the
Sheirdrim decision before passing Rowan to the DPEA to begin Public Inquiry
proceedings. They are concerned that once it reaches this stage and a Reporter were
appointed and were Sheirdrim to be refused it may not be as simple for the Council to
withdraw its objection. 
Officer Comment: If a Reporter were to be appointed, and Sheirdrim were to be refused,
and all the outstanding aviation objections were resolved the Reporter would see from the
Council’s consultation response that we would not intend to object in that situation.  It is
considered that the reasons for this are set out clearly in the recommended response. 
3. CONCLUSION & RECOMMENDATION
To clarify the Council’s position, it is recommended that an additional note is attached to
the recommendation to the ECU as detailed in supplementary report number 3. This
additional note states that if Sheirdrim Renewable Energy Development is refused by
Scottish Ministers then Argyll & Bute Council would no longer object to Rowan wind farm
on landscape and visual grounds.  No change is recommended to the reason for objection
or the note about the Council’s position in respect to aviation which states that in case of
Page 8

Page 9

the aviation objections being withdrawn the Council would no longer object on these
grounds. 
4. RECOMMENDED REASONS FOR OBJECTION TO: 22/00385/S36 
1. Landscape & Visual Impact (including cumulative) 
The proposed development site lies within the Knapdale Upland Forest Moor Mosaic
Landscape Character Type (LCT) which covers much of the Knapdale area between West
Loch Tarbert and the southern edge of the Knapdale National Scenic Area. This landscape
has a simpler landform in the south-west but is complex and craggy in the north-east. 
This proposal, which comprises very large turbines of up to 200m, would be sited in a basin
which reduces its prominence and intrusion seen from Loch Fyne and from the settled eastern
coastal fringes of this loch. The containment provided by landform is however diminished in
views from the south around West Loch Tarbert where turbines would be visible in closer
proximity and where their scale would be more appreciated due to greater visual exposure
and because they would be seen in close conjunction with the smaller scale settled loch
fringes. The proposal would significantly affect the character of West Loch Tarbert and views
from the A83, the Islay ferry route, settlement, and recreation routes on the south-eastern
shores of the loch. Proposed aviation lighting would increase the duration of these significant
adverse effects. While it is acknowledged that the extent of these significant adverse
landscape and visual effects is confined to the waters and south-eastern shores of West Loch
Tarbert and the proposal is well screened and/or distant from other sensitive locations, there
is concern about the effects on the tourist routes of the A83 and the Islay ferry which are
regionally important within Argyll and Bute. 
The potential cumulative effects of visible aviation lighting on character and views are also a
concern given the number of recent applications for turbines >150m in Argyll & Bute requiring
such lighting, including application stage: Narachan, Earraghail, Clachaig Glen and this
proposal although we consider that these effects could be mitigated to an acceptable degree
by the adoption of an Aviation Detection Lighting System which would significantly reduce the
duration of visible night-time lighting. 
The principal concern is, however, the cumulative landscape and visual effects likely to occur
with the application-stage Sheirdrim wind farm. If the Sheirdrim proposal is consented on
appeal, it is considered that the addition of the Rowan proposal would result in significant
combined cumulative landscape and visual effects on the West Loch Tarbert area with a
substantial increase in the extent of major adverse effects. It is considered that the nature of
these significant effects on landscape and visual interests would be of regional importance,
affecting not just the tourist routes of A83 and the Islay Ferry but also settlement and recreation
routes including views to and from the nationally important scheduled monument of Dun Skeig. 
In conclusion, it is considered that the cumulative landscape and visual impact of this proposal
with Sheirdrim is unacceptable. 
Having due regard to the above it is concluded that the proposal will have significant
adverse cumulative landscape and visual impacts and is therefore inconsistent with
the provisions of: SG LDP ENV 14 –Landscape; SG 2 Renewable Energy; LDP STRAT 1
– Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 3 – Supporting the Protection, Conservation and Enhancement
Page 9

Page 10

of our Environment; Policy LDP 6 – Supporting the Sustainable Growth of Renewables;
LDP 9 – Development Setting, Layout and Design; of the Argyll & Bute Local
Development Plan; the Argyll & Bute Landscape Wind Energy Capacity Study 2017; the
Onshore wind policy statement and Policies 4 (Natural Places) and 11 (Energy) of
National Planning Framework 4 (NPF4) 
2. Aviation 
Argyll & Bute Council will assess development proposals with the aim of preventing
unnecessary dangers to aircraft. Policy requires that development is refused where it would
constrain the present and future operations of existing airports and airfields. 
National Air Traffic Services Safeguarding (NATS) have advised that an unacceptable
technical impact is anticipated, and they object. Glasgow Prestwick Airport advise that the
development raises aviation safety concerns which have an operational impact on the airport
as an air navigation services provider. Until all technical and operational aviation safety
matters are addressed to the satisfaction of Glasgow Prestwick Airport, and a mitigation
agreement is put in place for the life of the wind farm, the airport also objects to the proposal. 
Local Development Plan Policy is clear that developments that have an adverse impact on the
Safeguarding of Airports should be refused. 
Having due regard to the above it is concluded that due to the fact that National Air
Traffic Services Safeguarding (NATS) and Glasgow Prestwick Airport have advised the
Energy Consents Unit that they object to the proposal, it will have an adverse impact
on aviation and is therefore inconsistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables and SG LDP TRAN 7
–Safeguarding of Airports of the Argyll & Bute Local Development Plan, the Onshore
Wind Policy Statement and Policy 11 (Energy) of the National Planning Framework 4 in
this respect. 
Argyll & Bute Council therefore object to the proposal due to the adverse impact it
would have on Aviation. 
The Energy Consents Unit should please note that: 
 Should Sheirdrim Renewable Energy Development be refused, then Argyll &
Bute Council would no longer object to Rowan wind farm on Landscape & Visual
grounds.  Should Sheirdrim Renewable Energy Development be approved then
the Council’s objection would be maintained as per the recommendation in this
report.
 If National Air Traffic Services (NATS) and Glasgow Prestwick Airport withdraw
their objections, then Argyll & Bute Council would no longer object on aviation
grounds. Should these objections not be removed, and the proposal progresses
to an Inquiry, Argyll & Bute Council would defer to National Air Traffic Services
and Glasgow Prestwick Airport as the Technical Experts on this matter. 
  
Author of Report: Arlene Knox        Date: 13th February 2023
Reviewing Officer: Sandra Davies       Date: 14th February 2023 
 
 
Fergus Murray   
Head of Development and Economic Growth   
Page 10

Page 11

Argyll and Bute Council   
Development and Economic Growth     
 
  
This Supplementary report is a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit (ECDU) Section 36 consultation on behalf of Drax
Cruachan Expansion Limited 
_________________________________________________________________________   
 
  
Reference No: 22/01221/S36   
 
  
Applicant:     The Scottish Government on behalf of Drax Cruachan Expansion Limited
Proposal:    Electricity Act Section 36 consultation relevant to construction and operation 
of new underground power station and associated infrastructure adjacent to 
Cruachan 1 to provide up to 600 megawatts (MW) of additional new    
generating capacity 
Site Address: Cruachan Power Station, Lochawe, Dalmally
________________________________________________________________________    
SUPPLEMENTARY REPORT NO. 1   
  
1. Legal Update on Wording of Recommendation
  
Since completion of the Report of Handling, Legal advice has very recently been received which
advises a change to the wording of the recommendation in order to avoid ambiguity on the
Council’s position and to protect the Council’s interests in the event that these issues are not
taken forward by the Energy Consents Unit. 
Revised Recommendation
Officers recommend that Members agree that the Council Objects to the current
proposals, unless the conditions as recommended by the Planning Authority and other
consultees are imposed on any consent.
Officers also seek Member’s authority to undertake further discussions with the
applicants and The Scottish Ministers to determine whether a planning condition, a
Section 69 agreement, or a Section 75 agreement between parties would most effectively
deliver the Council’s requirement for the necessary Housing Strategy. 
 
  
Author of Report: David Moore     Date: 14.02.23
Reviewing Officer: Sandra Davies     Date: 14.02.23  
 
 
  
Fergus Murray    
Head of Development and Economic Growth   
Page 11 Agenda Item 9