Democracy Spraffa

Agenda Document Pack - Kinross-shire Committee - 16/05/2024

Perth and Kinross Council · 16 May 2024
Back to Kinross-shire Committee — 16 May 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
10/05/2024 
A hybrid meeting of the Kinross-shire Committee will be held in ICT Meeting
Room, Loch Leven Community Campus on Thursday, 16 May 2024 at 17:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Dave Cuthbert  (Convener)
Councillor Richard Watters  (Vice-Convener)
Councillor Neil Freshwater
Councillor Willie Robertson
Neill Bingham
Sarah Bruce-Jones
Geoff Christie
Dave Morris
Fran Principe-Gillespie
Page 1 of 136

Page 2

Page 2 of 136

Page 3

Kinross-shire Committee 
Thursday, 16 May 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF KINROSS-SHIRE COMMITTEE OF 15
FEBRUARY 2024  FOR APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT (OBS)
(copy herewith 24/152) 
9 - 10 
5 ROADS UPDATE
Verbal Update by Traffic and Network Service Manager 
6 BLAIRINGONE PRIMARY SCHOOL
Verbal Update by Community Planning Team Leader 
7 FINANCIAL UPDATE
Verbal Update by Community Planning Team Leader 
8 SOUTH KINROSS FLOOD PROTECTION SCHEME
Verbal Update by Community Planning Team Leader 
9 KINROSS-SHIRE ACTIVE TRAVEL MASTERPLAN
(copy herewith 24/153) 
11 - 136 
Page 3 of 136

Page 4

Page 4 of 136

Page 5

KINROSS-SHIRE COMMITTEE 
Minute of hybrid meeting of the Kinross-shire Committee held in Loch Leven
Community Campus, Milnathort on Thursday 15 February 2024 at 5.00pm. 
Present: Councillors D Cuthbert, N Freshwater, W Robertson and R Watters; S
Bruce-Jones (Fossoway Community Council); F Principe-Gillespie (Cleish &
Blairdam Community Council); B Freeman (Kinross Community council); K
Donaldson (Portmoak Community Council); N Bingham (Milnathort and Orwell
Community Council); and M Ponton (Glenfarg Community Council). 
In Attendance: J Pepper, Chief Officer; Z Robertson S MacLean (all HSCP); 
M Butterworth, D McKeown, D Stokoe, S Kimmet, R Stuart and E Williamson
(Economy, Place and Learning); K Molley and M Pasternak (Strategy, People and
Resources). 
Councillor D Cuthbert, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all present to the meeting. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF PREVIOUS MEETING 
The minute of meeting of the Kinross-shire Committee of 16 November 2023
was submitted and approved as a correct record. 
In response to a question from Councillor W Robertson regarding a list of
potential ‘No Mo’ sites, M Butterworth confirmed that information would be shared
following budget decisions. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
(i) The contents of the Outstanding Business Statement, be noted.
(ii) It be agreed that completed actions would be removed from the Outstanding
Business Statement. 
5. PROVISION OF CARE IN KINROSS-SHIRE 
There was a verbal update by J Pepper, Chief Officer - Health and Social
Care Partnership, Z Robertson, Service Manager - Policy, and Commissioning
(HSCP) and S MacLean, Interim Service Manager (HSCP) on the provision of care
in Kinross-shire. 
3
Page 5 of 136

Page 6

J Pepper stressed the challenge of a growing and aging population and the
shortage of Heath and Care Professionals across Perth and Kinross, especially in
rural areas to be able to deliver services. J Pepper added that a Workforce
Development Officer had recently been appointed to be responsible for the
Workforce Plan. S MacLean confirmed that social media had been heavily used to
promote recruitment posts and advertisement through posters on local transport had
been undertaken. 
The Convener suggested that the Kinross-shire monies be used to highlight
job shortages and advertise the recruitment of health and social care posts in the
area through the Kinross-shire and other Community Council Newsletters. Officers
welcomed the suggestion and confirmed their communications team would draft
adverts to be circulated. 
6. ROAD SAFETY UPDATE 
There was a report by Head of Environmental & Consumer Services (24/57)
advising members of the Committee of progress on the delivery of road safety
projects within the Kinross-shire area.
Resolved:
(i)  The progress being made on the delivery of road safety schemes in         
Kinross-shire, be agreed.
(ii) It be noted that a further update will be brought to the Committee at a future 
meeting. 
7. BLAIRINGONE PRIMARY SCHOOL 
There was a verbal update by D Stokoe, Communities Service Manager and
S Kimmet, Community Empowerment Officer on Blairingone Primary School. D
Stokoe advised that the Fossoway Community Development Trust plan to look at
community engagement throughout March and April which the Service would
support. D Stokoe added that the Group would also like to undertake a feasibility
study on the building. 
In response to a question from the Convener regarding support available to
the Fossoway Community Development Trust to help fund the feasibility study, D
Stokoe confirmed that budget motion money had been set aside to support the Trust
to assess the liability of the building. S Kimmett confirmed that contact regarding
funding had been made with the Secretary of the Trust. 
In response to a question from Councillor N Freshwater regarding timescales
of the Community Asset Transfer, D Stokoe advised it had been agreed that the
Trust would have sufficient time to work thoroughly through the feasibility study
before it comes back to the Kinross-shire Committee for a decision. 
Page 6 of 136

Page 7

D Stoke advised that information on the valuation of the building would be
provided to members following the meeting and a further update would be brought
back to the next Committee. 
8. SOUTH KINROSS FLOOD PROTECTION SCHEME UPDATE 
R Stuart, Engineer (Flooding) delivered a slide-based presentation on the
South Kinross Flood Protection Scheme. Members questions were answered. The
Convener thanked R Stuart for his informative presentation. 
There was submitted a report by Head of Environmental and Consumer
Services (24/58) providing members of the Committee with the latest update on the
proposed flood protection scheme. 
Resolved:
The contents of Report 24/58, be noted. 
9. KINROSS-SHIRE ACTIVE TRAVEL MASTERPLAN 
There was submitted a report by Planning & Housing Strategy Manager
(24/59) advising the Committee of the funding towards Active Travel Plan in Kinross-
shire, following developed proposal from Tactran, PKC and Arup. 
In response to question from the Convener, E Williamson confirmed that the
local Community Councils would be key stakeholders in the Kinross-shire Active
Travel Masterplan. Members suggested that Glenfarg Community Transport and
Fossoway Community Development Trust should also be considered in the process.
E Williamson confirmed that a draft of the Masterplan would be brought to the next
Committee in May. The Convener asked members to contact the Clerk with any
other key stakeholders. 
The Vice-Convener suggested holding off on a decision to spend the £28,000
of the Kinros-shire monies until the next Committee in May to see if the money would
be needed to help deliver the masterplan. 
Resolved: 
The contents of Report 24/59, be noted. 
10. FOSSOWAY WINDFARM SURVEY 
There was a presentation by S Bruce-Jones (Fossoway Community Council)
highlighting the results of the Fossoway Windfarm Survey. 
Members questions were answered. The Convener thanked S Bruce-Jones
for her informative presentation. 
Page 7 of 136

Page 8

11. COMMUNITY INVESTEMNT FUND PANEL DATE 
The Committee agreed for the next meeting of the Community Investment
Panel to be held on 21 February 2024. 
12. ANY OTHER COMPETENT BUSINESS 
The Vice-Convener provided a very brief update on the Banking Hubs. He
referred to the consultation undertaken by the Senior Financial Conduct Authority on
access to cash and confirmed that he had responded to the consultation and raised
his concerns. The Vice-Convener confirmed that all local Community Councils had
the opportunity to respond to the consultation. The Vice-Convener advised that
unfortunately the process had been delayed and a further update would be brought
back to Committee later in the year. 
The Convener referred to M Butterworth, Head of Environmental and
Consumer Services, last meeting of the Kinross-shire Committee. The Convener
thanked M Butterworth for all his work in the development of the Committee and
members wished M Butterworth well for the future. 
~~~~~~ 
Page 8 of 136

Page 9

KINROSS-SHIRE LOCAL COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 24/152) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date. 
Actions which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s
agreement will be sought to its removal from the OBS. 
No. Minute 
Reference
Subject Title Outstanding
Action
Update Lead Officer
/Service
Action
due
Action
Expected
5. 24 August
2023
Member Training A further training
session to be
arranged for
members on the use
of Microsoft Teams.
A Training Session
has been arranged. 
Democratic
Services 
TBC TBC
6. 24 August
2023
Planning and
Enforcement
Session
A session to be
arranged for
members.
A Briefing Session to
be arranged for
members in due
course. 
David
Littlejohn
TBC TBC
7. 24 August
2023
Item 8
Kinross-shire
Local Committee:
Independent
Evaluation
Findings
A presentation to be
delivered to
members on the
powers and
decision-making
process from PKC
Legal and
Governance
Services followed by
a question-and-
answer session. 
A Briefing Session to
be arranged for
members in due
course. 
Lisa Simpson TBC TBC
8. 24 August
2023
Community
Transport Forum
An item to be
brought to a future
meeting of the
An item be brought to
a future meeting of
Margaret Roy TBC TBC
4
Page 9 of 136

Page 10

Kinross-shire
Committee. 
D Smart, Chair of
Glenfarg Community
Transport Group
presented at
Committee.
the Kinross-shire
Committee. 
10. 16 November
2023
Grassland
Management
A list of potential ‘No
Mow’ sites to be
shared with
members following
the meeting.
Email response was
issued to members. 
COMPLETED 
Lesly Ann
Cassidy
16 May 2024  16 May
2024
11. 15 February
2023 
Provision of Care
in Kinross-shire 
The Kinross-shire
Committee monies
be used to help
advertise and
promote health and
social care posts in
the local area
through the Kinross-
shire Newsletter and
other Community
Council Newsletters. 
Jacquie Peper  TBC  TBC
12.  15 February
2023
Former
Blairingone
Primary School 
Data on the
valuation of the
building to be
provided to
members.
Email response was
issued to members. 
COMPLETED 
David Stokoe 16 May 2024 16 May
2024
13.  15 February
2023 
Kinross-shire
Active Travel
Masterplan
Draft copy of the
Masterplan to be
submitted to
Committee in May.  
Elliot
Williamson 
16 May 2024  16 May
2024 
Page 10 of 136

Page 11

Kinross-shire Active Travel Masterplan
Perth and Kinross Council
Arup
May 2024
9
Page 11 of 136

Page 12

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
2
Contents
Introduction
Desktop Study
Baseline Mapping
Policy and Strategy Review
Baseline Data Review
Site Visit
Engagement
Online Community-wide Survey
Key Stakeholder Engagement
Masterplan Development
Masterplan Development
Interventions
Prioritisation and Phasing
Summary and Conclusions
Appendices
Appendix A- Desktop Scrapbook
Appendix B- Key Stakeholder Engagement Findings
Appendix C- Community-wide Survey Analysis
Appendix D- Interventions and Prioritisation
Page 12 of 136

Page 13

Introduction
3Page 13 of 136

Page 14

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Perth and Kinross Council (PKC) has appointed Arup to prepare an Active Travel
(walking, wheeling and cycling) Masterplan for Kinross-shire. The aim of the
Masterplan is to identify and prioritise interventions that will facilitate and encourage
short everyday journeys to be made actively. It will also consider placemaking
improvements to create more inviting, sustainable and attractive places for both
residents and visitors.
Kinross-shire is an electoral ward that forms part of PKC. It is a sparsely populated
area which is predominantly rural with key settlements including Kinross, Glenfarg
and Crook of Devon. Kinross-shire is bounded by Fife to the south and east, and
Clackmannanshire to the west.
The development of the Masterplan has been informed by the following key activities:
• A targeted baseline desktop study and site visit.
• Comprehensive engagement, including an online community-wide survey and
virtual workshops with key stakeholders throughout Kinross-shire.
• Regular liaison with PKC and the Kinross-shire Committee.
The main output from this study will be a Masterplan document, consisting of active
travel proposals across Kinross-shire which have undergone a prioritisation exercise.
The goal is to develop proposals that improve local environments, enrich quality of
life for local communities and improve people’s wellbeing by providing facilities that
support movement by active travel. The Masterplan will also strive to propose
interventions that facilitate an increase in physical activity across the local population,
as shown in the World Health Organisation diagram (see right).
Introduction
Kinross-Shire Active Travel Masterplan
4
Source: World Health Organisation (2022)- Global status report on physical activity 2022
Page 14 of 136

Page 15

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Objectives were developed during the early stages of the Kinross-shire Active Travel
Masterplan project. The Masterplan objectives have been used to inform decision
making associated with the development of the Masterplan as well as the prioritisation
and phasing exercise (see page 34).
The Masterplan objectives focus on climate change, improved health and wellbeing,
reduced inequalities and aim to deliver sustainable, inclusive economic growth
throughout Kinross-shire.
The objectives are closely aligned with the Transport Planning Objectives (TPOs)
developed for the Tactran Regional Active Travel Network. These TPOs were
developed to ensure alignment to national policy documents, such as Scottish
Transport Projects Review (STPR2) and Scotland’s National Transport Strategy 2
(NTS2), as well as the regional policy documents such as the Tactran Regional
Transport Strategy.
Introduction
Masterplan Objectives
5
Take Climate Action
•Enable and encourage multi-modal journeys.
•Enable and encourage shorter trips to local facilities by active travel.
Improve Health and Wellbeing
•Improve health outcomes for local communities by increasing physical activity.
•Reduce fatalities and injuries by creating safer and accessible active travel facilities.
•Improve air quality by enabling and encouraging more journeys by active modes.
Reduce Inequalities
•Improve access for everyone to key destinations and services by active modes.
•Provide alternative travel options for those facing economic hardship.
•Connect disadvantaged young people and rural communities to opportunities for further
education and employment.
Deliver Sustainable, Inclusive Economic Growth
•Develop an active travel masterplan that will contribute to local tourism growth.
•Develop an inclusive, future-proof masterplan that supports access to opportunities.
•Help reduce congestion and promote modal shift to active modes.
Page 15 of 136

Page 16

Desktop Study
6Page 16 of 136

Page 17

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Desktop Study
Overview
7
The desktop study has been carried out in a structured and targeted manner,
building on relevant work already undertaken. Select sources have been collated and
analysed to produce an evidence base used to inform the site visit and engagement
stages, and eventually the Masterplan development.
Data sources reviewed included, but were not limited to the following:
More details regarding findings from the desktop study can be found in Appendix A.
Tactran Regional
Transport Strategy
(2023-2034)
Tactran Regional
Active Travel
Network (2023)
Kinross-shire,
Almond and Earn
Local Action Plans
PKC Big Place
Conversation-
Let's Talk
Transport (2023)
Census Scotland
(2011)
Scottish Index of
Multiple
Deprivation (2020)
Crashmap
Collision Data
(2018-2022)
Cycling Scotland
Open-Source Data
Page 17 of 136

Page 18

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Baseline Mapping
Population Distribution
8
Mapping of population
distribution across Kinross-shire
has been developed using Census
Scotland 2011 data.
Mapping outputs show that
Kinross and Milnathort are the
most densely populated locations
across Kinross-shire. Crook of
Devon and Glenfarg are also
considered to be among the
higher populated settlements
within the ward.
When reviewing the Scottish
Government’s Urban Rural
Classification (2020), most of the
Kinross-shire area is classified as
‘accessible rural’ or ‘remote
rural’.  Remote rural areas are
particularly prevalent to the north-
west of the ward.
Page 18 of 136

Page 19

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Baseline Mapping
Key Services and Facilities
9
Mapping of key services and
facilities across Kinross-shire has
also been undertaken. These
include the main education,
healthcare, employment and
leisure facilities throughout the
ward. 
Mapping outputs show that there
are numerous education facilities
around Kinross and Milnathort,
including Loch Leven
Community Campus and Kinross
and Milnathort Primary Schools.
Loch Leven Health Centre is the
main healthcare facility
identified.
The mapping also shows leisure
and visitor facilities such as Loch
Leven Nature Reserve, Stronachie
Forest, Lendrick Muir Outdoor
Centre and the Scottish Gliding
Centre.
Page 19 of 136

Page 20

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Baseline Mapping
Existing Sustainable Transport Facilities
10
Mapping of existing sustainable
transport facilities across Kinross-shire
has been carried out. These include
existing local core paths, National
Cycle Network (NCN) routes and bus
stops/ routes across the ward.
Mapping outputs reveal that there are
several local core paths located
throughout Kinross-shire. NCN routes
also pass through the ward, including
NCN Route 1 which runs south-west to
north-east via Kinross and Loch Leven,
and NCN Route 775 which provides a
north-south connection between
Glenfarg and Milnathort / Kinross.
The mapping also shows local bus
stops and routes, which currently
provide connectivity to key settlements
such as Kinross, Minlathort,
Kinnesswood, Crook of Devon and
Glenfarg.
In addition, Kinross Park and Ride is
also shown, which provides
connectivity to Perth, Dundee and
Edinburgh. Page 20 of 136

Page 21

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Policy and Strategy Review
Overview
11
Policy and strategy documents related to active travel in Kinross-shire have been
reviewed, including the Tactran Regional Transport Strategy (2024-2034), PKC Big
Place Conversation (2023), PKC Let’s Talk Transport report (2023), Tactran Regional
Active Travel Network (2023) and the Kinross-shire, Almond and Earn Local Action
Plan (2017).
The key headlines are as follows:
• There is currently a lack of safe segregated active travel infrastructure across
Kinross-shire.
• Kinross-shire is within the top 10% most deprived areas in Scotland in terms of
‘geographic access’, which is determined by transport access to destinations such
as healthcare, education, employment and retail centres.
• The population of Perth and Kinross has a car kilometre average of 12,547km per
person per year. This is above Scotland’s average of 6,723km per person per year.
• 19% of the population in Perth and Kinross are aged 65 and over (older people are
less likely to have access to a car) which is 2% higher than the national average.
• 6% of people living in Kinross-shire do not have access to a car which is
significantly lower than the Perth and Kinross average of 21% and the national
average of 31%.
• Local streets across Kinross-shire are currently considered to be car dominated.
• There are many small remote villages throughout the ward, meaning people are
required to travel long distances to access key services.
Percentage of Trips
Trips within Perth and
Kinross
Less than 10km More than 10km
69% 31%
Source: Tactran Regional Active Travel Network 2023
Source: PKC Big Place Conversation- Let’s Talk Transport Main Issues Report 2023
Page 21 of 136

Page 22

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Baseline Data Review
Overview
12
Baseline data sources related to active travel in Kinross-shire have been reviewed as part
of the desktop study. The key findings can be found below, with more detailed
information provided in Appendix A.
Census Scotland 2011
Census data was gathered for Kinross-shire, which included ‘method of travel to work or
study’ and ‘distance to travel to work or study’. The key headlines are as follows:
• Walking accounts for 16% of all travel to work and study in Kinross-shire.
• Private car journeys (passenger and driving) account for 58% of travel to work/study
trips in Kinross-shire, which is almost 8% more than the national average.
• More than 2,000 people (around 14% of the Kinross-shire population) travel more
than 20km to work or study.
• There is a significant amount of movement by all modes of travel from Kinross to
Perth and Dunfermline as well as further afield to Edinburgh for work and study.
It is acknowledged that Census 2011 data is now over 12 years old, however has been
included to provide a summary of the geographic and transport context of Kinross-shire.
Census 2022 data is due to be published imminently, which will provide a more accurate
representation of geographic characteristics and transport statistics associated with
Kinross-shire.
Collision Statistics
The Crashmap online mapping tool was used to review collision statistics across
Kinross-shire. Crashmap utilises STATS19 pedestrian and cycle collision statistics
recorded by the Department for Transport. Collisions were reviewed for the previous five
years available (2018-2022).
The following conclusions can be drawn from this analysis:
• There have been three pedestrian casualties within Kinross-shire, all of which were
non-fatal and occurred around the Kinross and Milnathort area.
• There have been 10 pedal cycle casualties within the area, including one in Cleish that
resulted in a fatality and involved two vehicles.
Kinross-shire pedal cycle collisions (Source: Crashmap)Source: Census Scotland 2011- method of travel to work
Work or
study from
home
Walk Cycle Public
Transport
Car
Passenger
Car
Driver
Other
Kinross-shire 14% 16% 1% 10% 9% 49% 1%
Page 22 of 136

Page 23

Site Visit
13Page 23 of 136

Page 24

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Site Visit
Overview
14
A site visit was conducted by the Arup project team on the 7 March 2024. This site
visit built on the knowledge and understanding of the Kinross-shire area developed
during the desktop study.
A targeted site visit was carried out. Key locations were identified as areas to visit and
undertake observations. These included Kinross, Milnathort, Loch Leven, Crook of
Devon and Glenfarg.
The site visit involved assessing current walking, wheeling and cycling provisions,
and other existing transport infrastructure around key facilities such as:
• Education facilities such as local primary schools and Loch Leven Community
Campus.
• Town and village shops.
• Healthcare facilities.
• Kinross High Street.
• Public transport facilities such as the Kinross Park and Ride.
During the site visit, barriers, opportunities and general observations relating to active
travel, movement and placemaking were identified and recorded using the Google My
Maps mapping tool.
Kinross-shire site visit observations (source: Google My Maps)
Page 24 of 136

Page 25

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
A summary of the main observations made during the Kinross-shire site visit were as
follows:
The site visit provided the Arup project team with an understanding of potential
barriers to movement and opportunities for improvement in the main settlements and
throughout Kinross-shire.
Location Observations
Kinross-
shire wide
The rural setting of Kinross-shire means that many roads are narrow with a
60mph (national) speed limit. This is not appealing for cyclists or pedestrians.
There were several crossings observed with dropped kerbs but no tactile paving.
There were numerous ‘Walking and Cycling Friendly Roads’ signposted
throughout Kinross-shire. These were observed particularly in rural areas to the
west such as Cleish, Crook of Devon and Fossoway.
Kinross The Kinross Junction roundabout, which provides access to the M90 motorway,
was considered a major barrier to active travel movements from east to west due
to the lack of suitable infrastructure.
There is potential for a Mobility Hub to be implemented at Kinross Park & Ride
which encourages more sustainable travel and integration with active travel.
Milnathort There is an opportunity to improve existing placemaking in Milnathort centre.
Loch Leven There is an extensive existing local path network around Loch Leven. However,
connections to and from this path were considered less accessible.
Glenfarg Footway parking was observed in Glenfarg. There could be scope to formalise
parking and implement measures to keep footways clear and accessible for active
travel users.
Site Visit
Key Observations
15
Kinross Park and Ride Shared-use facility- Cleish to Crook of Devon
Opportunity to expand on existing placemaking in
Milnathort
Example of uncontrolled crossing with no tactile
pavingPage 25 of 136

Page 26

Engagement
16Page 26 of 136

Page 27

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Overview
Stakeholder and community engagement was carried out through an online
community-wide survey and virtual engagement with key stakeholders. The
engagement undertaken covered several topics, with a particular focus on active
travel, movement and placemaking across Kinross-shire. Digital methods were used to
engage with stakeholders and a degree of flexibility in the method of contribution was
taken to ensure all stakeholders could easily input into the project.
The stakeholders and community groups to be engaged with were agreed with PKC
and the Kinross-shire committee. The groups and individuals engaged with during the
project were as follows:
• Glenfarg Community Transport Group.
• Kinross Cycling Group.
• TRACKS Paths Group.
• SPARKS access group.
• Kinross-shire Community Councils.
Microsoft Teams was used to host online sessions, and Google My Maps was utilised
to collect stakeholder feedback, including the location of key facilities, barriers and
opportunities to active travel.
In addition to the engagement with key stakeholders, the public were engaged through
the community-wide survey. This was distributed via email to numerous community
groups within Kinross-shire, shared through social media platforms and was featured
in the April 2024 edition of the Kinross Community Council Newsletter.
Microsoft Forms was used to gather survey responses, with participants being given
the option to complete the survey via a handwritten response upon request.
More details on the engagement findings can be found in Appendix B (key
stakeholder engagement findings) and Appendix C (community-wide survey
analysis).
17Page 27 of 136

Page 28

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Community-Wide Survey
An online community-wide survey was developed and shared with the Kinross-shire
community through local community groups, social media platforms and through the
Kinross Community Council Newsletter. The survey was live from 18 March to 15
April 2024 and aimed to gather information on how residents currently travel for
everyday trips, barriers to movement and active travel improvements they would like
to see throughout Kinross-shire. There were a total of 177 responses to the survey.
The key findings from the community-wide survey are as follows:
• 98% of respondents live in Kinross-shire, and 69% of respondents make daily
trips out of Kinross-shire to school, study or for employment purposes.
• 92% of participants currently travel by private car for everyday trips.
• Many respondents would like to continue travelling via the same mode of travel
for everyday trips. However an additional 8% of participants would like to
walk/wheel compared to 18% participants who currently walk/wheel, meaning a
total of 26% of participants would like to travel by this mode.
• The most common responses for preferred mode of travel were ‘quickest’ and
‘lack of alternatives’.
• The most common destinations for everyday trips identified by participants
were shops, followed by parks and green spaces.
• The most popular barriers to travelling actively were ‘lack of existing active
travel facilities’ and ‘high vehicle speeds’.
A more detailed summary of the community-wide survey findings can be found in
Appendix C. 18
9%
19%
11%
11%11%
15%
12%
12%
Most Frequent Travel Destinations
Schools and nursery
Shops
Town centres
Places of work
Leisure facilities (e.g. sports centre)
Parks and green spaces
Visitor attractions (e.g. Loch Leven)
Visiting friends / family
Healthcare facilities
Park and Ride
Page 28 of 136

Page 29

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Community-Wide Survey
19
20%
6%
9%
20%6%
4%
6%
6%
10%
8%
1%2%
1%1%
The Main Barriers to Walking, Wheeling and
Cycling
Lack of existing active travel facilities
(e.g. cycle routes and footpaths)
Lack of road crossing facilities
Difficult junctions for pedestrians and
cyclists
High vehicle speeds
Traffic congestion
Poor lighting
Lack of cycle parking/ storage
Convenience of other modes of travel
Travel distance
Poor public transport provision
On street parking
Accessibility
Poor road surfacing
Other
28%
8%
10%
5%5%3%
7%
10%
4%
9%
2%
4% 5%
Measures that would Enable and Encourage More
Active Travel
Safer walking, wheeling and cycling routes
(e.g. segregated from vehicles, formal
crossing points etc.)Better/ more road crossing facilities
Better/ more cycle parking/ storage
Better lighting
More awareness of walking, wheeling and
cycling facilities
Placemaking (e.g. improvements that
create a more attractive place such as
street art and planting)Traffic-free streets/ pedestrianisation
Cycling-friendly streets
Better signage/ wayfinding
Better connections with public transport
Local initiatives (e.g. incentivisation,
walking challenges and cycle training
sessions)Benches, seating and rest places
More trees and/or greenery
Page 29 of 136

Page 30

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Key Stakeholder Engagement
Key stakeholders who participated in this engagement exercise were identified
through collaboration with PKC officers and the Kinross-shire committee.
Stakeholders were identified with the aim of ensuring fair representation across the
population of Kinross-shire.
Four key stakeholder engagement sessions were held online via Microsoft Teams with
the following organisations:
The sessions included discussions around the following key themes:
• Key facilities, services and everyday journeys.
• Main barriers to movement.
• Types of active travel improvements and opportunities.
The key headlines from these sessions are summarised throughout this section, with
full meeting notes from each session provided in Appendix B.
20
Event Organisation(s) Date
Glenfarg
Community
Transport Group
Session
Glenfarg Community Transport Group Thursday 21 March
2024
Kinross-shire
Community
Councils Workshop
Glenfarg Community Council Wednesday 27 March
2024Fossoway Community Council
Fossoway Community Development Trust
Milnathort and Orwell Community Council
Kinross Community Council
Portmoak Community Council
Cleish and Blairadam Community Council
Kinross Cycling
Group Session
Kinross Cycling Group Thursday 21 March
2024
TRACKS Paths
Group Session
TRACKS Paths Group Wednesday 3 April
2024 Page 30 of 136

Page 31

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Key Stakeholder Engagement
Kinross-shire Community Councils Workshop
Community Councils in Kinross-shire were invited to take part in an online workshop
to provide input into the Masterplan. Elected Members for the Kinross-shire ward also
attended the workshop.
During the workshop, there was representation from the following organisations:
• Fossoway Community Council and Fossoway Community Development Trust.
• Milnathort and Orwell Community Council.
• Kinross Community Council.
• Cleish and Blairadam Community Council.
Feedback from Glenfarg Community Council was gathered during discussions with
individuals from the Glenfarg Community Transport Group, who are active within the
Community Council. A summary of this discussion can be found on page 25.
The Elected Members in attendance also provided feedback on behalf of Portmoak
Community Council, who were unable to attend the workshop.
Key findings from the workshop contributed by each Community Council in relation
to their area are summarised in the table.
21
Community
Council
Feedback
Fossoway • B9097 from Drum to Crook of Devon - there is no footpath along this route, so
people are likely to drive instead of travelling actively.
• On-street parking in Crook of Devon and Blairingone is a barrier to movement.
• Old railway lines between Rumbling Bridge and Dollar could be used to
facilitate off-road active travel routes.
Milnathort
and Orwell
• There are no consistent footpaths from Milnathort towards Mawcarse.
• It would be great to join up footpaths and cycle paths from Kinross/ Milnathort
to outlying villages/ settlements to encourage everyday short journeys.
• Safe routes to school – existing crossing facilities across Stirling Road to get to
Milnathort Primary School are poor. A formalised crossing point could be
considered.
• There could be an opportunity to close roads to through traffic and create
walking/cycling streets only (e.g. Milnathort Primary School access road).
Kinross • There is a lot of local knowledge of existing paths, however people are not
aware of any overarching publicly available map that shows all the existing
walking and cycling paths.
• Many rural roads across Perth and Kinross have ‘walking and cycling friendly
road’ signage. There was unanimous agreement that roads with a 40mph speed
limit should not be classed as walking and cycling friendly.
• People would use their cars less if they felt safe cycling and if they had
somewhere safe and secure to store their bikes.
Cleish and
Blairadam
• Many roads around Cleish and Blairadam do not have protection for pedestrians
or cyclists even on roads that are marked ‘walking and cycling friendly’. One
disabled participant said that a 40mph road with no footpath is not safe.
• Getting from Cleish along the B9097 is dangerous for walking and cycling.
• Changes in Edinburgh such as reallocating road space have been successful.
Portmoak • There is currently no safe and consistent path to take children from Scotlandwell
to Portmoak Primary School. People are currently unable to cycle or walk safely
as path is only around one metre wide.
• There is currently no path near the A911 that goes from Loch Leven’s Larder
towards Milnathort.
Page 31 of 136

Page 32

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Key Stakeholder Engagement
Kinross-shire Community Councils Workshop
The adjacent map highlights the key Kinross-shire wide
problems and opportunities raised by Community
Councils at the workshop.
Full notes from this workshop can be found in
Appendix B.
22
Safer routes to
schools and
community facilities
Poor public transport
currently in terms of
connectivity and
frequency
Better connectivity
between existing active
travel paths across
Kinross-shire
No publicly available
overarching map showing
active travel routes
across Kinross-shire
Poor east-west
connectivity between
communities in relation
to public transport
Opportunity to
repurpose old railway
lines into active travel
routes
Cross-boundary
connectivity is important
as some key services are
located in neighbouring
local authorities
Roads marked as
'cycling and walking
friendly' are not deemed
safe for active travel
The speed of traffic
along rural roads is
too fast, which brings
safety concerns and is
considered a barrier
to active travel
It is important to
develop the
Masterplan with
future development
in mind
Increase provision
of safe and secure
cycle parking
Segregated active travel
infrastructure is preferred
over non-segregated and
shared use
Page 32 of 136

Page 33

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Key Stakeholder Engagement
Glenfarg Community Transport Group
Two representatives from the Glenfarg Community Transport Group (GCTG) took
part in an online workshop. The GCTG was formed in 2023 and provide community
bus services within Glenfarg and the wider area. These are fixed route bus services
with some select on-demand services.
The discussion was therefore focussed around Glenfarg and the surrounding area. Key
findings from the session are summarised below.
23
Theme Feedback
Key facilities,
services and
everyday journeys
• The village shop is the main facility in Glenfarg.
• All key facilities are in Kinross to the south or Perth to the north.
• Some people cycle to Kinross but very few walk. Most people are likely
to drive or use the community bus.
Barriers to
movement
• High vehicle speeds are prevalent passing through Glenfarg.
• Current 40mph walking and cycling friendly roads across Kinross-shire
are not perceived to be safe.
• There is a perceived lack of cross-boundary walking and cycling routes-
for example paths currently stop between Fife and Kinross-shire.
• It is often difficult for people to find information on walking and cycling
routes.
Opportunities and
types of
interventions
• Opportunity for a Village Mobility Hub at the village hall using COMO
UK best practice. This may include a café and shared bike facilities.
• NCN Route 775 route runs through the village. There may be scope for
this to be improved.
• There could be scope to create a brand for walking and cycling
throughout Kinross-shire.
Source: Glenfarg Community Transport Group
Page 33 of 136

Page 34

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Key Stakeholder Engagement
Kinross Cycling Club
One representative from the Kinross Cycling Club took part in an online session. The
Kinross Cycling Club is well established and has over 200 members, who are located
primarily in the Kinross-shire area.
Key findings from this session are summarised below.
24
Theme Feedback
Key facilities,
services and
everyday journeys
• Most people in Kinross-shire commute to Perth, Dunfermline or
Edinburgh.
• There is no local train station therefore public transport facilities are
limited to bus services.
• The Loch Leven Community Campus is a key destination- this is a school
with a large catchment.
Barriers to
movement
• The M90 motorway is a clear barrier to movement which often makes
east-west movements challenging for those walking, wheeling and cycling.
• A lack of north-south connections is currently a barrier to movement for
those walking, wheeling and cycling.
• The A977 through Crook of Devon and Drum is perceived to be the most
dangerous road to travel on.
• General confidence of cyclists, particularly in rural areas, is often a barrier
to active travel.
Opportunities and
types of
interventions
• Opportunity to identify priority cycling infrastructure routes to maintain
over the winter months.
• Existing walking and cycling friendly roads in Kinross-shire are
considered to boost confidence and enhance perceived safety.
• Led group cycle rides and cycle training could be undertaken using local
paths surrounding Loch Leven to boost confidence among beginner
cyclists in a traffic-free location. Source: Kinross Cycling Club Facebook Page
Page 34 of 136

Page 35

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Engagement
Key Stakeholder Engagement
TRACKS Paths Group
Five representatives from TRACKS Paths Group took part in an online session.
TRACKS is a charity within Kinross-shire that was set up with the main aim of
addressing the local desire to have a walking and cycling path around Loch Leven.
TRACKS have successfully created this path around the loch and have contributed to
the creation of many other local paths connecting to various parts of Kinross-shire.
Key findings from this session are summarised below.
25
Theme Feedback
Key facilities,
services and
everyday journeys
• All key facilities are located in Kinross to the south.
• After school activities clubs are held around the Loch Leven Community
Campus.
Barriers to
movement
• Fast moving traffic throughout Kinross-shire.
• Several problematic junctions throughout Kinross-shire such as the
crossing point on Springfield Road near where it meets Muirs.
• On-street parking impacting the safety of cyclists.
• It is often difficult to find out information on walking and cycling routes.
• NCN Route 1 takes cyclists over the Cleish Hills which is not direct and
steep to cycle.
• There are many good quality paths however many of these do not link up
with each other and there are many gaps in footway provisions.
Opportunities and
types of
interventions
• There is an opportunity to use old railway lines as active travel routes, as
this takes active travel users away from vehicle routes.
• Opportunity to connect villages to the Loch Leven Heritage Trail.
• There could be scope to add a pedestrian crossing along the main road in
Milnathort.
• There are opportunities to introduce traffic calming measures throughout
Kinross-shire.
Source: TRACKS website
Page 35 of 136

Page 36

Masterplan Development
26Page 36 of 136

Page 37

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Overview
The Masterplan development stage has been a collaborative process with PKC and
the Kinross-shire committee. The Masterplan considers the information gathered
throughout the desktop study, site audit and engagement stages to ensure the
Masterplan interventions are functional and desirable by those who will benefit from
their use.
The Masterplan development stage has consisted of the development of an
intervention list, which has taken the key issues and opportunities that arose
throughout the project stages to develop a series of interventions across Kinross-shire.
This was followed by a prioritisation and phasing exercise, where each intervention
was scored against a series of quantitative and qualitative criterion.
‘Quick wins’have been identified within the Masterplan. These are interventions that
can have a high impact across Kinross-shire and can be delivered at a relatively low
cost within a short timeframe. These interventions can generate initial momentum to
increase active travel trips across Kinross-shire, while longer term proposals are
implemented to complement and expand on these interventions.
The preliminary nature of the interventions and the information provided is intended to
help inform further stages of scheme development. Given the scope and magnitude of
many of the interventions, the Masterplan will be developed and implemented over a
15-year timescale. Some interventions will require robust business case development
and will be dependent on external funding, while others can be delivered in the short
term.
High level cost estimates have been calculated for each of the interventions. These are
subject to further investigation and should therefore only be treated as indicative.
27
Masterplan Development
ENGAGEMENT
SITE AUDIT
DESKTOP STUDY
Page 37 of 136

Page 38

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Interventions
Masterplan interventions have been developed based on the key findings from the
desktop study, site visit, key stakeholder engagement sessions and the community-
wide survey. The interventions are located throughout Kinross-shire with the aim of
facilitating and encouraging walking, wheeling and cycling across the population.
The interventions are also considered to reflect the Masterplan objectives developed at
the start of the project (see page 5).
The Masterplan interventions have been split into the following categories:
• Kinross-shire wide interventions.
• Location-specific interventions:
– Active travel routes.
– Active travel junction/ crossing improvements.
– Placemaking/ community active travel facilities.
– Parking and road network improvements.
The interventions for each category are summarised throughout this section. The full
list of interventions can be found in Appendix D.
28Source: ArupPage 38 of 136

Page 39

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Interventions
Kinross-shire Wide Interventions
A total of nine Kinross-shire wide interventions have been developed as part of the
Masterplan. These are interventions which could be progressed and applied
throughout Kinross-shire, and are as follows:
1. Development of a Kinross-shire active travel mapping tool.
2. Design and delivery of safe routes to school to all Kinross-shire schools.
3. Speed limit reductions in residential locations and nearby key facilities.
4. Improvements to existing crossing facilities.
5. Improved signage and wayfinding of existing active travel routes.
6. Secure cycle storage facilities at key destinations and public transport facilities.
7. Development of a campaign and brand for walking, wheeling and cycling in
Kinross-shire, which is consistent with Perth and Kinross and the wider Tayside
region.
8. Improved maintenance of existing footways and other active travel routes.
9. Integration of bikes and buses throughout Kinross-shire.
These measures reflect the findings that could be applied to all of Kinross-shire. For
example, issues such as safe routes to school, vehicle speeds and lack of awareness of
existing active travel routes were repeatedly raised during key stakeholder discussions
and throughout the community-wide survey responses.
29
Source: Falco- example cycle parking
Source: Mobilleo- GO-HI travel app
Page 39 of 136

Page 40

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Interventions
Active Travel Routes
Proposed active travel routes have been identified based on key origins, destinations
and everyday journeys acknowledged throughout the project stages. The identification 
of potential active travel routes also considers appropriate distances and types of
environments where users are likely to travel actively.
The types of active travel routes identified are as follows:
• High quality active travel routes, in line with Cycling by Design 2021
guidance requirements, for example between Kinross and Milnathort.
• Quiet streets, where routes are prioritised for walking, wheeling and cycling
through access only for residents, emergency vehicles and deliveries.
• Minor active travel improvements, including NCN improvements, signage,
road markings, resurfacing, footway widening and cutting back of overhanging
vegetation.
Active travel routes have been identified between key settlements such as Kinross,
Milnathort, Crook of Devon and Glenfarg. Cross-boundary routes have also been
proposed between Kinross-shire and the neighbouring local authorities of Fife and
Clackmannanshire.
Progression of the active travel routes proposed will require further feasibility and
concept design work. Some of these proposals will also require the purchase of third-
party land and buy-in from neighbouring local authorities.
30
Source: Walking Cycling Climate Action Ltd , Albert Place Stirling
Source: Arup, Connswater Community GreenwayPage 40 of 136

Page 41

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Interventions
Active Travel Junction/ Crossing Improvements
Numerous junction and crossing improvements have been proposed throughout
Kinross-shire.  This has been based on findings from the desktop study and site visit,
alongside feedback received from key stakeholder discussions and the community-
wide survey.  Within this feedback many specific locations and types of crossing
improvements were identified.
Interventions identified include the following:
• Improvements to existing junction and crossing facilities, including junction
re-design at the Kinross M90 junction, priority crossings for active travel users
and relocation of existing crossing points across key settlements.
• Identification of new crossing facilities, including controlled road crossings
and dropped kerbs and tactile paving throughout key settlements.
These improvements strive to ensure better actual and perceived safety, inclusivity,
connectivity and route continuity for active travel users of all ages and abilities
throughout Kinross-shire.
Many of these interventions are also considered to be ‘quick wins’ that could be
delivered at a low cost and short timescale by PKC. However, interventions such as
redesign of the Kinross/ M90 junction are likely to be longer term aspirations that will
require feasibility and design work, technical approvals, traffic modelling and buy-in
from key stakeholders such as Transport Scotland.
31Source: Arup, example uncontrolled crossing improvements
Source: Transport Scotland Cycling by Design 2021- junction re-
design visualisation
Page 41 of 136

Page 42

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Interventions
Placemaking / Community Active Travel Facilities
Various placemaking and community active travel facilities throughout Kinross-shire
were identified throughout the project stages. These interventions strive to create safer,
more attractive, healthier, and inclusive places for both residents and visitors by
increasing and diversifying the number of trips made by walking, wheeling, and
cycling for everyday journeys.
The placemaking/ community interventions proposed are as follows:
• Mobility Hubs in line with COMO UK best practice, at key locations such as
Kinross, Glenfarg and Portmoak.
• Placemaking improvements in Milnathort Town Centre.
• Cycle storage facilities in Kinross High Street.
• Footwalk repair along the Loch Leven Heritage Trail.
The next steps to deliver these interventions would be to undertake further feasibility
and concept design work, alongside identifying and applying for funding sources.
Potential national funding sources identified for these interventions include but are not
limited to the Transport Scotland Active Travel Transformation Fund, Tactran Active
Travel Behaviour Change and Access to Bikes programme, Paths for All Community
Project Transition Fund, Cycling Scotland funding and the Scottish Government Place
Based Investment Programme.
32
Source: Lock It Safe, example cycle storage hub, Perth
Source: COMO UK, Mobility Hub concept
Page 42 of 136

Page 43

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Interventions
Travel Behaviour Change
In addition to the Kinross-shire wide interventions that relate to travel behaviour
change, the potential for utilising the Loch Leven Heritage Trail to deliver local
active travel behaviour change initiatives was identified.
Discussions with the Kinross-shire Committee and other key stakeholder workshops
indicated the pride that the Kinross-shire community have in the Loch Leven Heritage
Trail in terms of quality and usage by residents and visitors. Discussions with the
Kinross Cycling Club in particular, implied that there is an opportunity to use the
heritage trail for behaviour change initiatives such as cycle training for all ages,
including school children, adults and the elderly, and led cycle rides.
The aim of this intervention would be to increase confidence among beginner cyclists
in a traffic-free environment, and ultimately increase the uptake in cycling locally as a
recreational activity and for everyday journeys.
It is considered that this intervention could be pursued and funded by organisations
such as Transport Scotland, Tactran, Sustrans, Paths for All and Cycling Scotland, in
collaboration with PKC.
33Source: Sustrans
Source: Bikeability
Page 43 of 136

Page 44

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Interventions
Parking and Road Network Improvements
Several key issues relating to parking and the road network were identified during key
stakeholder workshops and the community-wide survey. These included high vehicle
speeds and parking causing obstructions to active travel users at specific locations.
The interventions considered to deliver the most positive impact for active travel users
have been included as part of the Masterplan. These are as follows:
• Parking formalisation in key locations such as Milnathort and Glenfarg.
• Traffic calming measures through Cleish and Scotlandwell.
• Road network improvements along the B9097 between Gairneybank and
Crook of Devon, which may include road resurfacing, traffic calming measures
and speed limit reductions through settlements.
It is acknowledged that whilst the interventions identified above will bring benefits for
active travel users, these improvements will benefit all road users and are not measures
specific to just walking, wheeling and cycling. This has been reflected in the
prioritisation scoring summarised throughout the remainder of this section and in
Appendix D.
Next steps to deliver these interventions include further feasibility and concept design
work and commencing any technical approvals required such as Traffic Regulation
Orders.
34
Source: Arup, example vehicle activated sign
Source: Sustrans, example 20mph speed limit
Page 44 of 136

Page 45

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
A prioritisation and phasing exercise has been undertaken to prioritise the intervention
list and inform the delivery of the Masterplan. This consisted of the development of
prioritisation criteria (see page 36) which has been used to score and prioritise the
location-specific interventions to inform a phasing and delivery plan for the
Masterplan.
Following the prioritisation scoring, the location-specific interventions have been split
into three phases. The criteria for each phase is summarised in the table below.
The Kinross-shire wide interventions (see page 29) were not included as part of this
prioritisation exercise. This is due to their lack of suitability to scoring against the
prioritisation criteria and the lack of information against key criteria such as land
ownership and cost. However, their importance within the wider context of Kinross-
shire is recognised, therefore it is recommended that these proposals are progressed in
parallel with the location-specific interventions.
‘Quick wins’ have also been identified from the intervention list. These are
interventions estimated to be lower cost (less than £250,000), short delivery timescale
(0-1 years) and located within the PKC adopted road boundary. These interventions
can be prioritised by the PKC Traffic and Network team in the short term.
The Kinross-shire wide interventions, interventions for each Masterplan phase and
‘quick wins’ are presented throughout the remainder of this section.
35
Scoring range Summary
Phase 1 33 to 40 High priority interventions
Phase 2 25 to 32 Medium priority interventions
Phase 3 Less than 25 Lower priority interventions
Page 45 of 136

Page 46

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Prioritisation criteria
36
Criteria Sub-criteria Low score =1 Medium score =3 High score =5
1. Alignment with Project Objectives This intervention is considered to be in alignment
with less than 2 of the masterplan objectives.
This intervention is considered to be aligned with at
least 2 of the masterplan objectives.
This intervention is considered to be aligned with
more than 2 of the masterplan objectives.
2. Connectivity to Key Facilities The intervention does not improve connectivity to any
key local facilities.
The intervention improves connectivity to at least one
key local facility.
The intervention improves connectivity to multiple
key local facilities.
3. Community Engagement /
Level of community /
stakeholder support
3a. Engagement Sessions/ Big
Place Conversation Responses
The intervention has a low or unknown level of
support from the community / stakeholders as this
was not referenced during engagement sessions.
The intervention has some level of support from the
community / stakeholders as this was referenced
during at least 1 engagement session.
The intervention has high level of support from the
community / stakeholders as this was referenced
multiple times across numerous engagement sessions.
3b. Online Community-Wide
Survey Responses
The intervention was not referenced within the online
survey responses.
The intervention was referenced at least once within
the online survey responses.
The intervention was referenced multiple times within
the survey responses.
4. Land Ownership
The majority of the intervention is likely to be out-
with the PKC road adoption or land ownership area,
and / or requires multiple other landowner
agreements.
The majority of the intervention is likely to be within
the PKC road adoption or land ownership area, and /
or is likely to require at least 1 other landowner
agreement.
The intervention is likely to be entirely within the
Perth and Kinross road adoption or land ownership
area.
5. Cost The intervention is high cost (>£1,500,000). The intervention is medium cost (£500,000 -
£1,500,000). The intervention is low cost (<£500,000).
6. Funding The intervention requires multiple sources of funding,
or there are no identified funding sources.
The intervention requires securing funding from an
external source.
The intervention requires no external funding/ only
PKC / Tactran or existing community funding source.
7. Timescales The intervention is considered to be a longer-term
aspiration which is likely to be delivered in 3-5 years.
The intervention is considered to be an intervention
which can be delivered in a medium (1-3 years)
timescale.
The intervention is considered to be an intervention
which can be delivered in a short (0-1 years)
timescale.Page 46 of 136

Page 47

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Kinross-shire Wide Interventions
37
Intervention Type Summary Description
1 Kinross-shire Wide Kinross-shire active travel mapping tool
Creation of Kinross-shire active travel mapping tool which summarises all existing walking, wheeling and cycling routes throughout
Kinross-shire. This could be used to map all existing Kinross-shire active travel routes, then undertake a gap analysis and feasibility
work with the aim of joining up existing active travel routes.
2 Kinross-shire Wide Safe Routes to School to all Kinross-shire schools Safe Routes to School between key settlements and all schools across Kinross-shire. This may include signage and wayfinding,
resurfacing, road markings and segregated active travel infrastructure where feasible.
3 Kinross-shire Wide Speed limit reductions in residential locations and
nearby key facilities
Traffic calming measures and lowering speed limits will make opportunities for walking, wheeling and cycling safer and encourage
greater uptake. The lowering of speed limits could occur around residential areas, schools and healthcare facilties.
4 Kinross-shire Wide Existing crossing facility improvements Throughout Kinross-shire there are inadequate dropped kerbs and a lack of tactile surfaces at crossing points. Therefore,
improvements with dropped kerbs and tactile paving are required across all built up areas throughout Kinross-shire.
5 Kinross-shire Wide Improved signage and wayfinding of existing active
travel routes Clear signage and wayfinding which would make walking, wheeling and cycling routes more visible to residents.
6 Kinross-shire Wide Secure cycle storage facilities at key destinations and
public transport facilities
Installing secure cycle storage facilities at key destinations and public transport interchanges would encourage multi-modal
transportation and offer convenient and attractive options for cyclists using public transport.
7 Kinross-shire Wide Campaign and brand for walking, wheeling and cycling
in Kinross-shire
A Kinross-shire active travel campaign and brand symbol that could feature on maps highlighting walking, wheeling and cycling
routes. This should be consistent with active travel branding for Perth and Kinross and the wider Tayside region.
8 Kinross-shire Wide Improved maintenance of footways and other active
travel routes
Fallen debris and overgrown vegetation can make footways, footpaths and key cycle routes slippery and are often not gritted during
the winter months meaning they aren't accessible. Numerous active travel routes could be widened significantly by cutting back
vegetation.
9 Kinross-shire Wide Integrating bikes and buses The integration of bikes and buses on public and community bus services. This may include retrofitting buses to incorporate cycle
storage, the use of ‘bike socks’ (covers) and the provision of cycle parking at bus stops and stations.
Page 47 of 136

Page 48

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Kinross-shire Wide Interventions
3838
Intervention Summary
1 Kinross-shire active travel mapping tool
2 Safe Routes to School to all Kinross-shire schools
3 Speed limit reductions in residential locations and
nearby key facilities
4 Existing crossing facility improvements
5 Improved signage and wayfinding of existing active
travel routes
6 Secure cycle storage facilities at key destinations and
public transport facilities
7 Campaign and brand for walking, wheeling and cycling
in Kinross-shire
8 Improved maintenance of footways and other active
travel routes
9 Integrating bikes and buses
Page 48 of 136

Page 49

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Phase 1
39
Intervention Type Summary Description
1. Alignment with
Project
Objectives
2. Connectivity to
Key Facilities
3. Community Engagement / Level of Community and Stakeholder
Support
4. Land Ownership 5. Cost 6. Funding 7. Timescales Total
3a. Engagement Sessions/ Big
Place Conversation Responses
3b. Online Community-Wide
Survey Responses
1 Active Travel junction /
crossing improvements
Existing crossing improvements on
Stirling Road, New Road and South Street
in Milnathort
Provision of safe crossing points for children accessing Milnathort Primary School and
users accessing Milnathort centre. 5 5 5 5 5 5 5 5 40
2 Active Travel junction /
crossing improvements
Existing crossing improvements at Station
Road/ Junction Road junction and Ochil
View in Kinross
Crossing improvements including dropped kerbs and tactile paving and controlled crossing
facilities which deliver priority for walking wheeling and cycling. 5 5 5 3 5 5 5 5 38
3 Active Travel junction /
crossing improvements
Existing crossing improvements in
Glenfarg
Crossing improvements at Greenbank Road/ B996 Main Street junction and Ladeside
Road/ B996 Main Street junction. 5 5 5 3 5 5 5 5 38
4 Active Travel Routes Active travel minor improvements along
Gallowhill Road in Kinross
Minor improvements including footway widening, cutting back overhanging vegetation
and provision of controlled crossing points at key desire lines. 5 3 3 5 5 5 5 5 36
5 Active Travel Routes
Active travel minor improvements along
Burns-Begg Street, Kirkgate and Pier
Road in Kinross
Minor improvements including active travel signage, resurfacing and road markings. This
would provide dedicated active travel access from Kinross High Street to Loch Leven. 5 5 3 3 5 5 5 5 36
6 Active Travel Routes Active travel improvements between
Scotlandwell and Kinnesswood
Active travel improvements including footway widening through Scotlandwell, widening
of Kilmagad Wood active travel facility and improved crossing facilities in Kinnesswood. 5 5 5 5 3 5 5 3 36
7 Active Travel Routes Footway widening through Cleish
Footway widening where feasible through Cleish to provide more space for walking and
wheeling and improve active travel access to Cleish Primary School and Cleish Village
Hall.
5 5 3 3 5 5 5 5 36
8 Active Travel Routes Sustrans School Street to Milnathort
Primary School
Sustrans School Street along Church Street providing walking, wheeling and cycling only
access to Milnathort Primary School during school pick-up and drop-off times. 5 5 5 3 5 5 3 3 34
9 Active Travel Routes
One-way system and active travel
improvements along Greenbank Road in
Glenfarg
One-way system and active travel improvements along Greenbank Road, including a
Mixed Traffic Street and footway resurfacing and widening where feasible. 5 5 3 3 5 5 5 3 34
10 Active Travel junction /
crossing improvements
New crossing facility along Springfield
Road in Kinross
Controlled crossing facility and improved visibility along Springfield Road to the north of
Wilson Court. 3 3 3 5 5 5 5 5 34
11 Active Travel junction /
crossing improvements
Relocate and improve existing crossing
point on Springfield Road in Kinross
Relocate and improve existing crossing point on Springfield Road at the junction by Muirs
to further down Springfield Road away from the junction. 3 3 3 5 5 5 5 5 34
12 Placemaking / community
active travel facilities
Cycle storage facility in Kinross High
Street
Provision of safe and secure bike storage along Kinross High Street. Sheltered where
feasible. 5 5 3 3 5 5 3 5 34
13 Parking and Road
Network improvements
Parking formalisation along South Street
in Milnathort
Parking formalisation will reduce the impact of parked vehicles along South Street on
active travel users. This will include road markings to create parking bays, and control
measures, which will require a Traffic Regulation Order.
3 5 5 3 5 5 5 3 34
14 Parking and Road
Network improvements
Formalised parking and measures to
prevent footway parking in Glenfarg
Parking formalisation including road markings to create parking bays and parking control
measures, which will require a Traffic Regulation Order. Footway parking along the Main
Street in particular is narrowing available space for active travel users.
3 5 5 3 5 5 5 3 34
Page 49 of 136

Page 50

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Phase 1
40Page 50 of 136

Page 51

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Phase 2
41
Intervention Type Summary Description
1. Alignment with
Project
Objectives
2. Connectivity to
Key Facilities
3. Community Engagement / Level of Community and
Stakeholder Support
4. Land Ownership 5. Cost 6. Funding 7. Timescales Total
3a. Engagement Sessions/ Big
Place Conversation Responses
3b. Online Community-Wide
Survey Responses
15 Active Travel Routes
Active travel minor improvements
between Kinross junction and Kinross
Park and Ride
Minor improvements along existing footpath including resurfacing, wayfinding and cutting
back overhanding vegetation to provide an attractive active travel connection between the
Kinross junction and Kinross Park and Ride.
5 3 3 1 5 5 5 5 32
16 Active Travel Routes Minor improvements between Wester
Balgedie and Kinnesswood
Minor improvements to existing active travel route including signage, cutting back
vegetation and removing access barriers for inclusivity. 5 3 3 3 3 5 5 5 32
17 Active Travel junction /
crossing improvements
New crossing facility between
Milnathort and Mawcarse New crossing facility where the footway moves from the west to the east of the carriageway. 3 3 3 3 5 5 5 5 32
18 Placemaking / community
active travel facilities
Mobility Hub at Kinross Park and
Ride
Mobility Hub at Kinross Park and Ride using COMO UK best practice. This may include
facilities such as high-quality cycle storage, shared bike facilities, real-time information and
placemaking.
5 5 5 3 5 3 3 3 32
19 Placemaking / community
active travel facilities
Loch Leven Heritage Trail footwalk
repair Repair footwalk to the north of the Loch Leven Heritage Trail to improve accessibility. 5 3 3 3 5 5 3 5 32
20 Placemaking / community
active travel facilities Glenfarg Village Mobility Hub
Village Mobility Hub at Glenfarg Village Hall using COMO UK best practice. This may
include amenities such as a café and shared bike facilities. This could be implemented on a
wider scale across Kinross-shire
5 5 5 1 5 5 3 3 32
21 Active Travel Routes
High quality active travel route
between Kinross Park and Ride and
Kinross High Street
High quality active travel route along B918 between Kinross Park and Ride and Kinross
High Street, following Cycling by Design guidance. 5 5 3 3 5 3 3 3 30
22 Active Travel Routes Quiet street along Ochil View / Green
Road in Kinross
Quiet street which prioritises walking, wheeling and cycling and provides resident, blue
badge, delivery, and emergency vehicle access only. This provides an opportunity to reduce
through traffic (through signage improvements only), alongside traffic calming measures
and placemaking (additional cost).
5 3 3 1 5 5 5 3 30
23 Active Travel Routes
Improvements to the National Cycle
Network Route 775 between Glenfarg
and Milnathort
Improvements to the National Cycle Network Route 775 between Glenfarg and Milnathort
which may include resurfacing, improved road markings and signage and wayfinding. 5 5 5 3 5 1 3 3 30
24 Active Travel junction /
crossing improvements New crossing facility in Gairneybank Provide a safe crossing point for residents at the B996/ Hatchbank Road junction in
Gairneybank. 3 3 1 3 5 5 5 5 30
25 Active Travel junction /
crossing improvements
New crossing facility to Carnbo
community hall Crossing facility providing safe active travel access to Carnbo community hall. 3 3 3 1 5 5 5 5 30
26 Placemaking / community
active travel facilities
Placemaking improvements in
Milnathort centre
Introduction of additional seating, planters and permanent cycle parking in Milnathort centre
to create an attractive environment for residents and visitors. 5 3 3 1 5 5 3 5 30
27 Travel Behaviour Change Loch Leven Heritage Trail behaviour
change events
Utilise the Loch Leven Heritage Trail to deliver behaviour change events such as cycle
training and led walks and cycle rides. 5 3 3 1 5 5 3 5 30
28 Parking and Road
Network improvements
Traffic calming along Main Street and
Leslie Road in Scotlandwell
Traffic calming measures including vehicle activated signage and speed humps, which will
make opportunities for walking, wheeling and cycling safer and encourage greater uptake. 3 3 3 3 5 5 5 3 30
29 Parking and Road
Network improvements
Road network improvements along
B9097 between Gairneybank and
Crook of Devon
Road network improvements which would improve conditions for cyclists may including
road resurfacing, traffic calming measures and speed limit reductions through settlements. 3 3 5 1 5 5 5 3 30
30 Active Travel Routes
Active travel minor improvements
between Loch Leven's Larder and the
Loch Leven Heritage Trail.
Minor improvements including resurfacing and wayfinding which will improve active travel
accessibility between Loch Leven's Larder and the Loch Leven Heritage Trail. 3 3 3 1 3 5 5 5 28
31 Placemaking / community
active travel facilities Portmoak Hall Village Mobility Hub Village Mobility Hub at Portmoak Hall using COMO UK best practice. This may include
amenities such as a café and shared bike facilities. 5 3 3 1 5 5 3 3 28
32 Parking and Road
Network improvements Traffic calming through Cleish Introduction of traffic calming measures through Cleish , which may include speed humps,
speed cushions and vehicle activated speed signage. 3 3 1 3 5 5 5 3 28
Page 51 of 136

Page 52

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Phase 2
42Page 52 of 136

Page 53

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Phase 3
43
Intervention Type Summary Description
1. Alignment
with Project
Objectives
2.
Connectivity
to Key
Facilities
3. Community Engagement / Level of
Community and Stakeholder Support 4. Land
Ownership 5. Cost 6. Funding 7. Timescales Total3a. Engagement
Sessions/ Big Place
Conversation Responses
3b. Online
Community-Wide
Survey Responses
33 Active Travel
Routes
Cross-boundary active
travel route between
Kinross-shire and Fife
High quality active travel route along the B996 between
High Street in Kinross and Black Road in Kelty, following
Cycling by Design guidance.
5 3 5 5 1 1 3 1 24
34 Active Travel
Routes
High quality active travel
route between Kinross
and Milnathort
High quality active travel route along the B996 between
B918 Station Road in Kinross and Church Street in
Milnathort, following Cycling by Design guidance.
5 5 5 3 1 1 3 1 24
35 Active Travel
Routes
High quality active travel
route between Kinross
and Crook of Devon
High quality active travel route along A977 between Kinross
junction and Crook of Devon, following Cycling by Design
guidance.
5 5 5 3 1 1 3 1 24
36
Active Travel
junction /
crossing
improvements
Active travel junction
improvements at the M90
/ Kinross Junction
Active travel improvements including a clearly defined
active travel route, controlled crossing facilities and clear
signage and wayfinding. This intervention will improve
active travel access through the junction and better east-west
connectivity.
5 5 3 3 3 1 3 1 24
37 Active Travel
Routes
High quality active travel
route between Wester
Balgedie and Milnathort
High quality active travel route along A911 between Wester
Balgedie and Milnathort via Loch Leven's Larder, following
Cycling by Design guidance.
5 5 3 3 1 1 3 1 22
38
Active Travel
junction /
crossing
improvements
Existing footbridge
improvements in
Glenfarg
Footbridge improvements in line with Cycling by Design
guidance, including increasing parapet height and amending
the distance between bollards for wheelchair users.
3 3 1 1 3 5 3 3 22
39 Active Travel
Routes
Cross-boundary active
travel route between
Kinross-shire and
Clackmannanshire
High quality active travel route along the A91 between
Milnathort and Pool of Muckhart, following Cycling by
Design guidance.
5 3 3 3 1 1 3 1 20
40 Active Travel
Routes
Cross-boundary off-road
active travel route
between Rumbling
Bridge and Dollar
Cross-boundary, off-road active travel route along the
disused railway line between Rumbling Bridge and Dollar
which would provide a high-quality, traffic-free active travel
facility between Kinross-shire and Clackmannanshire,
following Cycling by Design guidance.
5 3 3 3 1 1 3 1 20
Page 53 of 136

Page 54

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
Phase 3
44Page 54 of 136

Page 55

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Masterplan Development
Prioritisation and Phasing
‘Quick wins’
45
Intervention Type Summary Description
1 Active Travel junction /
crossing improvements
Existing crossing improvements on Stirling Road, New
Road and South Street in Milnathort Provision of safe crossing points for children accessing Milnathort Primary School and users accessing Milnathort centre.
2 Active Travel junction /
crossing improvements
Existing crossing improvements at Station Road/
Junction Road junction and Ochil View in Kinross
Crossing improvements including dropped kerbs and tactile paving and controlled crossing facilities which deliver priority for
walking wheeling and cycling.
3 Active Travel junction /
crossing improvements Existing crossing improvements in Glenfarg Crossing improvements at Greenbank Road/ B996 Main Street junction and Ladeside Road/ B996 Main Street junction.
4 Active Travel Routes Active travel minor improvements along Gallowhill
Road in Kinross
Minor improvements including footway widening, cutting back overhanging vegetation and provision of controlled crossing
points at key desire lines.
5 Active Travel Routes Active travel minor improvements along Burns-Begg
Street, Kirkgate and Pier Road in Kinross
Minor improvements including active travel signage, resurfacing and and road markings. This would provide dedicated active
travel access from Kinross High Street to Loch Leven.
7 Active Travel Routes Footway widening through Cleish Footway widening where feasible through Cleish to provide more space for walking and wheeling and improve active travel
access to Cleish Primary School and Cleish Village Hall.
10 Active Travel junction /
crossing improvements
New crossing facility along Springfield Road in
Kinross Controlled crossing facility and improved visibility along Springfield Road to the north of Wilson Court.
11 Active Travel junction /
crossing improvements
Relocate and improve existing crossing point on
Springfield Road in Kinross
Relocate and improve existing crossing point on Springfield Road at the junction by Muirs to further down Springfield Road away
from the junction.
16 Active Travel Routes Active travel minor improvements between Kinross
junction and Kinross Park and Ride
Minor improvements along existing footpath including resurfacing, wayfinding and cutting back overhanging vegetation to
provide an attractive, off-road active travel connection between the Kinross junction and Kinross Park and Ride .
18 Active Travel junction /
crossing improvements
New crossing facility between Milnathort and
Mawcarse New crossing facility where the footway moves from the west to the east of the carriageway.
20 Placemaking / community
active travel facilities Loch Leven Heritage Trail footwalk repair Repair footwalk to the north of the Loch Leven Heritage Trail to ensure accessibility for all users.
24 Active Travel junction /
crossing improvements New crossing facility in Gairneybank Provide a safe crossing point for residents at the B996/ Hatchbank Road junction in Gairneybank.
25 Active Travel junction /
crossing improvements New crossing facility to Carnbo community hall Crossing facility providing safe active travel access to Carnbo community hall.
*These interventions have been extracted from the full intervention list and have been identified as ‘quick wins’.Page 55 of 136

Page 56

Summary and Conclusions
46Page 56 of 136

Page 57

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Summary and Conclusions
Overview
PKC appointed Arup to develop an Active Travel Masterplan for Kinross-shire. The
goal was to develop proposals that improve local environments, enrich quality of life
for local communities and improve people’s wellbeing by providing facilities that
support movement by active travel.
The proposals identified throughout the Kinross-shire Active Travel Masterplan were
informed by the key project stages including a targeted desktop study, site visit,
engagement including key stakeholder workshops and findings from an online
community-wide survey.
The highlights from the Masterplan are as follows:
• Active travel routes, including improvements to existing NCN routes, quiet
streets and high-quality, cross-boundary routes between key settlements and
neighbouring local authorities Fife and Clackmannanshire.
• Active travel junction / crossing improvements, including junction re-design
proposals at the Kinross / M90 junction, improvements to existing crossing
facilities and new crossing facilities across Kinross-shire.
• Placemaking / community active travel facilities, including Mobility Hubs,
placemaking and cycle storage facilities at key locations.
Delivery of the Masterplan will bring a wide range of positive impacts for the local
area. The prioritisation and phasing of the interventions identified through this
Masterplan will also be utilised to inform the planning and delivery of active travel
infrastructure throughout Kinross-shire.
Next steps in relation to delivery will vary based on the intervention. Some
interventions, such as the ‘quick wins’ could be progressed in the short-term by the
PKC Traffic and Network team, whereas other interventions will require further
feasibility, design work, land ownership considerations and technical approvals to
progress.
Potential funding sources for the Masterplan interventions include but are not limited
to existing PKC Traffic and Network funding, regional funding such as the Tactran
Active Travel Behaviour Change and Access to Bikes Grant, and national funding such
as the Sustrans NCN Improvements and Signage Fund, Sustrans Places for Everyone
Fund and Transport Scotland Active Travel Transformation Fund.
47Source: ArupPage 57 of 136

Page 58

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
References
48
1. Census Scotland (2011). Method of Travel to Work or Study, Distance of Travel to Work or Study and Datashine Commute.
2. Cycling Scotland (2024). Open-Source Data.
3. Department for Transport (2024). Department for Transport STATS19 Collision Data.
4. ESRI (2024). Open-Source Data.
5. Glenfarg Community Transport Group (2023). Glenfarg and Surrounding Area Action Plan for Active Travel and Sustainable Transport.
6. Living Streets (2018). Kinross Community Street Audit Report.
7. National Cycle Network (2024).
8. Perth and Kinross Council (2022). Local Government Ward Profile 2022. Ward 8 – Kinross-shire.
9. Perth and Kinross Council (2023). Big Place Conversation – Let’s Talk Transport.
10. Perth and Kinross Council (2024). Kinross-shire, Almond and Earn Local Action Plan.
11. Perth and Kinross Council (2024). Active Travel Strategy for Perth and Kinross.
12. Scottish Household Survey (2021). Perth and Kinross and Tactran- reasons to travel.
13. Scottish Index of Multiple Deprivation (2020).
14. Strava (2024). Cycling Heat Maps.
15. Sustrans (2024). Network Planning Tool Scotland.
16. Tayside and Central Scotland Transport Partnership (2024). Tactran Regional Active Travel Network.
17. Tayside and Central Scotland Transport Partnership (2024). Tactran Regional Transport Strategy 2024-2034.
Page 58 of 136

Page 59

Appendices
49Page 59 of 136

Page 60

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Appendix A
Desktop Scrapbook
50Page 60 of 136

Page 61

Kinross-shire Active Travel Masterplan
Desktop Scrapbook
Page 61 of 136

Page 62

Contents
1. Background
• Kinross-shire Fact File
2. Policy and Strategy Review
• Tactran Regional Transport Strategy 2024-2034 (Draft for Consultation)
• PKC Let's Talk Transport Main Issues Report
• Tactran Regional Active Travel Network
• Kinross-shire, Almond and Earn Local Action Plan
• Glenfarg and Surrounding Area Action Plan for Active Travel and Sustainable Transport
• Living Streets Kinross Community Street Audit Report
• Perth and Kinross Active Travel Strategy
3. Baseline Data Review
• Census Scotland 2011 Data
• Collision Data
• Sustran Network Planning Tool
• Scottish Index of Multiple Deprivation
• Scottish Household Survey Data
• Cycling Scotland
• Baseline Mapping
Page 62 of 136

Page 63

1. Background
Arup has been appointed by Perth and Kinross Council to
produce an Active Travel Masterplan for the area of
Kinross-shire. This includes the towns of Kinross,
Milnathort, Glenfarg and Crook of Devon.
The ward has an area of approximately 26 square
kilometres and the population is estimated to be around
14,630 1.
This document provides the findings and analysis from the
key elements of the desktop review stage.
Documents and data reviewed includes:
• Local Transport and Planning Policy
• Baseline data, including Census data, movement flows
and accident statistics.
• Mapping, including OS Mapping and the Scottish
Index for Multiple Deprivation.
1 Population Mid-Year Estimates 2020 (www.statistics.gov.scot) Page 63 of 136

Page 64

1. Background
Kinross-shire Fact File
Population size: ~14,630
Demographics: The ward has a notably higher proportion of those aged 45-
64 years a notably lower proportion of those aged 20-39 years compared to
Perth and Kinross.
Key medical facilities:
• Loch Leven Health Centre
• Orwell Practice
• St. Serf’s Practice
Main features:
• Loch Leven National Nature Reserve
• Kinross Golf Club
• Milnathort Golf Club
• Glen Devon Woodlands
• M90
Key education centres:
• Arngask Primary School (~81 pupils)
• Cleish Primary School (~39 pupils)
• Fossoway Primary School (~87 pupils)
• Kinross Primary School (~472 pupils)
• Milnathort Primary School (~214 pupils)
• Portmoak Primary School (~117 pupils)
• Kinross High School (~953 pupils)
Main employment industries:
• Human health and social work activities (~869
people)
• Education (~578 people)
• Construction (~549 people)
Kinross-shire population between 2011 and 2020
Kinross-shire population pyramid
Page 64 of 136

Page 65

2. Policy and Strategy Review
Tactran Regional Transport Strategy 2024-2034 (Draft for Consultation)
Summary Points:
• 67.3% of people in Perth and Kinross live in rural areas, many of whom are
dependent on strategic routes to access jobs, services and healthcare.
• Approximately 12% of the population of Perth and Kinross are in the lowest 20%
SIMD data zones for access.
• 3.23% of Perth and Kinross are in the lowest 20% SIMD data zones for health.
• Average car kilometres driven per person per year is 12,547km in Perth and
Kinross.
• 60% of trips made by those living in the region are by car.
• Approximately 20% of jobs in the region cannot be accessed within 60 minutes
by public transport by the working age population.
• 29% of the population never walk as a means of transport, 30% never for
pleasure.
• 57% of people in the 20% most deprived areas regularly walk for recreation
compared to 78% of people in the least deprived areas.
The Regional Transport Strategy (RTS) is a partnership plan identifying the strategic transport priorities for the Angus, Dundee City, Perth
and Kinross and Stirling Council areas. It provides a unique and complementary role to support both local and national strategies.
Page 65 of 136

Page 66

2. Policy and Strategy Review
Tactran Regional Transport Strategy 2024-2034 (Draft for Consultation)
Public feedback concluded that the main transport issues in the
region were:
• Addressing the impacts and causes of climate change.
• Availability and cost of transport to access jobs, education
and services.
• Impact of traffic: many communities are located on trunk
roads and are subject to the traffic volumes these routes
bring.
• The ability of people with disabilities to use transport
networks. Nearly 9% of people within the region are limited
a lot by long term health problems or disabilities.
Page 66 of 136

Page 67

2. Policy and Strategy Review
Tactran Regional Transport Strategy 2024-2034 (Draft for Consultation)
Outcome (summary) Outcome (detailed) Indicator
Modal shift to more sustainable modes of
travel.
Personal travel: increase the share of trips
made by sustainable modes such as
walking, cycling and public transport.
Mode share: main mode of travel.
Reduce car kilometres driven Reduce car kilometres driven. Car kilometres travelled on roads.
Reduce fatalities and injuries Improve road safety for vulnerable users
(pedestrians, cyclists, children and older
people)
• people killed
• people seriously injured
• children (aged <16) killed
• children (aged <16) seriously injured
• pedestrians killed or seriously injured
• cyclists killed or seriously injured
• motorcyclists killed or seriously injured
• road users aged 70 and over killed or seriously injured
• road users aged between 17 and 25 killed or seriously injured.
• Percentage of motorists driving/riding within the posted speed limit.
• The casualty rate for the most deprived 10% SIMD areas compared to the least deprived 10%
SIMD areas.
Increase levels of physical activity Pedestrian and cycle counts in least
affluent SIMD data zones.
Mode share travel to school in least
affluent SIMD data zones.
Improved ability to access active leisure
facilities and green space least affluent
SIMD data zones.
Limited data available. SHS includes ‘Adults (16+) - frequency of walking in previous 7 days. This
question could be repeated in a separate survey aimed at the region’s least affluent areas
Sustrans Hands Up Survey data available.
Percentage of population within the least affluent SIMD data zones within a 5-minute walk of their
local green or blue space. Percentage of the population within the least affluent SIMD data zones
able to access a public leisure centre by public transport within 30 minutes and 60 minutes by public
transport.
Transport Strategic Targets (relevant to active travel)
Page 67 of 136

Page 68

2. Policy and Strategy Review
Tactran Regional Transport Strategy 2024-2034 (Draft for Consultation)
Action How agencies may apply the action
Action 4:
All agencies will promote awareness and advantages of
sustainable travel.
Behavioural change campaigns to promote active and sustainable travel across Travel to Work Areas and/or
nationally.
Promoting bike hire schemes.
Action 12:
Roads and planning authorities will improve the
accessibility and security of the street environment.
Step free routes and appropriate crossing facilities to public transport interchange points; local centres (ie within
20min neighbourhoods) and key services.
Seating.
Lighting and reviewing the design of the public realm to improve security.
Signage and wayfinding.
Action 15:
Tactran, the Councils and the National Park Authorities will
improve walking and cycling opportunities.
Connected neighbourhoods, enabling people to access local facilities, including mobility and public transport
hubs, by walking and cycling.
Cycle hire schemes, increasing access to cycles through cycle hire schemes (whether that be conventional or
electric cycles).
Action 16:
Tactran and the Councils will promote active and
sustainable access to schools.
i) Safer routes to schools – improving walking and cycling routes to schools, including reducing traffic
speeds around schools.
ii) School exclusion zones – limiting traffic around schools at peak times to improve safety and air quality for
children.
iii) Cycle parking; cycle training and improving access to bikes.
Action 21:
Tactran and the Councils will work with respective partners
to provide and improve public transport interchanges.
Mobility hubs link a number of transport services within a community to improve access via different modes to
enable your onward journey. This usually means improving the ability to access bus services by e.g. car and
bicycle parking; bike hire; walking and cycling links; demand responsive bus services.
Actions set out by the strategy for rural areas (small towns, villages, countryside) relating to active travel.
Page 68 of 136

Page 69

2. Policy and Strategy Review
PKC Let's Talk Transport Main Issues Report
Key Points:
• Perth and Kinross Council’s Corporate Plan 2022-27 (December 2022) includes a list of local, regional and national strategies
and plans which set out the context for how to deliver the priorities contained in the Corporate Plan. A Mobility Strategy has
been identified as a key strategy in delivering two Corporate Plan priorities: tackling climate change; and a stronger and greener
economy.
• The Mobility Strategy is one of three place-based strategies which shape how places develop over the long-term. This includes
the Local Housing Strategy and the Local Development Plan.
• The Mobility Strategy, often known as a local transport strategy, will set out Perth and Kinross Council’s vision for managing
and developing the transport network over a minimum period of 10 years.
• Following public consultation, the mobility strategy is expected to be finalised in Summer 2024.
Sustrans Perth Cycling and Walking Index (2021):
• 57% of residents walk five or more times a week
• 5% of residents cycle five or more times a week
• 80% of residents feel walking is safe around Perth and Kinross
• 17% of residents cycle a minimum of once a week
Page 69 of 136

Page 70

2. Policy and Strategy Review
PKC Let's Talk Transport Main Issues Report
The Mobility Strategy aims to support a variety of national, regional, and local strategies and policies
Policy/Strategy Aims
National Planning Framework 4 • Sustainable places
• Liveable places
• Productive places
Scotland’s public health priorities • Live in vibrant, healthy and safe places and communities
• Have good mental wellbeing
• Have a sustainable, inclusive economy with equality of outcomes for all
• Eat well, have a healthy weight and are physically active
Scotland’s Road Safety Framework to 2030 • 50% reduction in people killed and seriously injured (relative to the 2014-2018 average)
National Transport Strategy 2 Priorities • Reduce inequalities
• Take climate action
• Help deliver inclusive economic growth
• Improve health and wellbeing
Scotland Climate Change Plan 2018-2032 • Net zero by 2045
• Reduce car kilometres by 20% by 2030
Fairer Scotland Action Plan • A fairer Scotland for all
• Ending child poverty
• A strong start for all young people
• Fairer working lives
• A thriving third age
Page 70 of 136

Page 71

2. Policy and Strategy Review
PKC Let's Talk Transport Main Issues Report
Key points:
• Over the next 10 years (2018-2028), Perth and
Kinross has a projected population net increase of
1%.
• Perth and Kinross’s population has a car kilometre
average of 12,547km per person per year. This is
above Scotland’s national average of 6,723km per
person per year.
In order to achieve a 20% reduction in car kilometres, represented
by the green line in the figure above, nearly 30 years of growing
car demand would need to be reversed.
Local interventions delivered by Perth and Kinross Council
to encourage active travel:
• 20 mph limits around several residential areas
• School exclusion zones
• Playable routes to school
• Improved road crossings
The Core Paths Plan:
The Plan for Perth and Kinross was adopted by the Council in early
2012 and was later revised in 2017. the Plan laid out a system of
paths, totalling up to 2043km around the area. As walking is a key
mode of travel across Perth and Kinross, these paths are highly
utilised.
Page 71 of 136

Page 72

2. Policy and Strategy Review
PKC Let's Talk Transport Main Issues Report
NTS Priority Problem Opportunity
Health and wellbeing • Lack of safe segregated active
travel infrastructure
• Car dominated streets
• Physical health/obesity
• Mental health
• Walkable/wheelable city centre and
rural villages
• Perth and Kinross walking statistics
• Already existing rural services,
GP’s, schools, shops etc
• Spatial planning
Climate action • Lack of active travel infrastructure • Walkable/wheelable city centre and
rural village centres
• National Cycle Network
Existing Problems and Opportunities identified by PKC relating to active travel.
Page 72 of 136

Page 73

2. Policy and Strategy Review
Tactran Regional Active Travel Network
The Tactran Regional Active Travel Network provides an extensive, evidence-based plan to transform active travel provision in the region.
The Tactran region features Angus, Dundee, Perth and Kinross, and Stirling Council local authority areas where there is a 63% urban and
37% rural split. Following the Scottish Government Urban Rural Classification, 29% of the population living within these areas are
residing in locations classified as remote or rural.
Page 73 of 136

Page 74

2. Policy and Strategy Review
Tactran Regional Active Travel Network
Key findings from desktop review relevant to Kinross-shire:
• Connecting smaller settlements along route sections can enable shorter everyday trips to be made by active modes. This will allow active travel to be the mode choice for many.
• Stakeholder engagement was undertaken to allow for stakeholder conversations on their experience around the areas, settlements and active travel in the Tactran region.
• The network has been informed by a strong evidence base including desktop analysis and stakeholder engagement, however, further options appraisal work is required to
determine final route alignment options. Moving forward, the web map allows for the status of individual routes to be updated as their development status changes. Future
funding applications for individual routes can utilise the baseline data/evidence base that has informed the development of the regional active travel network.
Web map (desirable features to have incorporated
into map):
• Local routes and links to understand relation to
the network and where delivery could be
aligned.
• Strategic development aeras to ensure future
proofing.
• Origin-destination and key trip generators data
to understand where there is demand.
• Catchment areas for schools to ensure safe
routes to schools are delivered.
• Areas of multiple deprivation.
• Greenspace and leisure destinations to boost
visitors and improve health and wellbeing
• Trip end facilities and behaviour change
initiatives.
Inclusivity:
• Elevation and distance noted as major barriers to making an active travel
network inclusive.
• Connectivity to ‘Keep Safe Places’ throughout the region to ensure
mobility impaired and other vulnerable  groups have somewhere safe to
go when in need.
• Facilitation of adapted cycle parking at key public transport interchanges
as well as at any other key facilities.
• Design of routes should meet CbD standards, delineation for visually
impaired people is very important as well as changes in materials to alert
users of any potential dangers.
• Signage and wayfinding should be easy to understand and follow for all
types of people, making it frequent and large enough for people to
interpret.
• Reducing conflict of shared spaces through behaviour change initiatives
and education to compliment the network.
Multi-criteria assessment:
• Fit with existing policy/strategy
• Access to key services, including
healthcare, education, employment,
public transport and town centres.
• Tourism and visitor locations enhance
by routes.
• Demand and household or population
density.
• Enabling the ‘20-minute
neighbourhood’ principle.
• Elevation
• Distance
• Reallocation of road space and
supporting a reduction in vehicle
kilometres.
Page 74 of 136

Page 75

2. Policy and Strategy Review
Tactran Regional Active Travel Network
Multi-criteria assessment criteria Page 75 of 136

Page 76

2. Policy and Strategy Review
Tactran Regional Active Travel Network
Multi-criteria assessment criteria Page 76 of 136

Page 77

2. Policy and Strategy Review
Kinross-shire, Almond and Earn Local Action Plan
Key Points:
• There are many small villages throughout the locality of the
area which are often remote and mean that some people
need to travel long distances to access key services.
• The area is a popular place for young families to settle,
explaining why it has the highest proportion of 0-19-year-
olds in Perth and Kinross, comprising of 22.5% of the
population.
• Some of the young people move away from the area for
education and employment opportunities after leaving
school resulting in fewer 20-34-year-olds (15.8%).
• 19% of the population are aged 65 and over.
Transport and Access
• Transport is a key issue impacting upon people in
Kinross-shire.
• The access indicator which is calculated using travel
time to key services has identified many areas of the
locality as being in the top 10% most access deprived
areas in Scotland.
• Car ownership/ access to a car is important for people
living in the more rural parts of Kinross-shire. 6% of
people living in Kinross-shire do not have access to a
car which is lower than national average.
• Older people are less likely to have access to a car
which can be a challenge for people to go to a
supermarket or attend a medical appointment.
Page 77 of 136

Page 78

2. Policy and Strategy Review
Kinross-shire, Almond and Earn Local Action Plan
Key issue identified Community Plan strategic
objective
What needs to change Actions Who
Transport in rural Kinross-
shire presents a barrier to
accessing services, leisure
and employment
opportunities
Promoting a prosperous,
inclusive and sustainable
economy
Supporting people to lead
independent, healthy and
active lives
Local transport solutions
need to be developed to
allow rural communities to
access services, leisure and
employment opportunities.
a. The Action Partnership
to discuss issues and
possible solutions with
Perth and Kinross
Council
b. Share suggestions with
other Action
Partnerships as
relevant.
Perth and Kinross Council
Kinross-shire, Almond and
Earn Action Partnership
Perth and Kinross have five Local Action Partnerships, each representing different area localities. Each
partnership is comprised of representatives from public services, local community and councillors from the area.
Local Plan strategic objectives relevant to active travel:
Page 78 of 136

Page 79

2. Policy and Strategy Review
Glenfarg and Surrounding Area Action Plan for Active
Travel and Sustainable Transport
This Action Plan was developed following the feedback from a
questionnaire designed and adapted from the Place Standard Tool
and three in person workshops which were held in September
2023. All the outcomes were reviewed with six actions selected
and explored in more detail.
Priority Topic Action
1. Road safety Measures to address speeding issues
(e.g. extension of 20mph zones,
improved enforcement of speed limits
and other traffic calming measures).
2. Public transport Support and sustain the community bus
service in Glenfarg and surrounding
areas including the expansion of some
routes.
3. Active travel Create and improve connected active
travel routes for both leisure and
practical purposes that accommodate
walking and wheeling and improve
connections between villages in the area.
4. Parking Explore better parking solutions.
5. Maintenance Improved maintenance of pavement
surfaces.
6. Active travel Establish a walking/cycling bus
programme for the school and enhance
safe communal travel among pupils.
The six key actions highlighted by the Action Plan
Page 79 of 136

Page 80

2. Policy and Strategy Review
Glenfarg and Surrounding Area Action Plan for Active Travel and Sustainable Transport
Overall responses and response rates highlighting key themes following on from engagement conversations and survey feedback are
shown below:
Summary of Action Plan
Page 80 of 136

Page 81

2. Policy and Strategy Review
Glenfarg and Surrounding Area Action Plan for Active Travel and Sustainable Transport
Summary of Action Plan
Page 81 of 136

Page 82

2. Policy and Strategy Review
Living Streets: Kinross Community Street Audit Report
Living Streets are a UK charity for which aim to promote walking
for everyday journeys.
Recorded assets and barriers on local streets and paths in Kinross
that encourage/ discourage everyday walking with the needs of
older and more vulnerable groups in mind.
The audit was driven by residents contacting the PKC transport
team and councillors over issues such as the lack of safe
accessible routes for wheelchair and mobility aid users.
Residents were specifically interested in the lack of dropped kerbs
along routes to the Health Centre, local amenities and issues with
two poorly maintained paths.
•Improving the dropped kerbs and tactile
paving at the main entrances to the
Primary School and along the main routes
to the Health Centre.
Lack of dropped kerbs
and tactile paving
(particularly around
the Primary School)
•Cutting back the vegetation on the blind
corner before the roundabout on
Springfield Road near the north end of
Wilson Court and adding ‘beware
pedestrians ahead’ signs or adding a
pedestrian crossing where the current
island is installed.
Poor surface on path
at Greenpark
•Upgrading the surfaces of the short paths
at Greenpark and between Lomond Place
and Gallowhill Road. This includes fixing
the overhanging fence at Greenpark.
Poor surface on path
between Lomond
Place and Gallowhill
Road
Barriers to accessing the
GP surgery included:
Recommendations for
improvements include:
Page 82 of 136

Page 83

2. Policy and Strategy Review
Living Streets: Kinross Community Street Audit Report
The Audit Report identified five issue groups which were
allocated actions accordingly:
Extract from Living Streets report
Page 83 of 136

Page 84

2. Policy and Strategy Review
Perth and Kinross Active Travel Strategy
This strategy has been developed to encourage, enhance and
monitor active travel modes rather than motorised methods of
transport. The strategy outlines the following objectives:
• Reduce the impacts of congestion, air pollution and severance  
of vehicular transport on Perth and Kinross Communities
• Provide a more socially inclusive transport system
• Improve public health
• Boost economic activity
It also outlines the following targets:
• Increase the number of journeys made my bike in Perth and
Kinross as recorded in 2011 Census
• Increase the number of journeys made on foot across Perth
and Kinross as recorded in 2011 Census
• Increase the proportion of residents of Perth and Kinross
walking more than 30 minutes in one go per month by 5% by
2028 compared to the 2018 baseline
• Increase the proportion of residents cycling monthly or more
often in Perth and Kinross by 50% by 2028 compared to the
2018 baseline
Walking and cycling network in Perth and Kinross:
Page 84 of 136

Page 85

2. Policy and Strategy Review
Perth and Kinross Local Development Plan 2 (2019)
Key Points:
• The majority of proposals focus on Kinross and Milnathort.
• There are housing development proposals for areas in Balado, Powmill and Scotlandwell and an area for
opportunity and housing identified north-west of Athron Hall along The Woods has been identified.
LDP2 Webmap showing the development proposals for Kinross-shire north of Kinross. LDP2 Webmap showing the development proposals for Kinross-shire south-
east of Kinross.
Page 85 of 136

Page 86

2. Policy and Strategy Review
Perth and Kinross Local Development Plan (2019)
Key Points:
• There are three housing proposals to the
north-west of Milnathort.
• Several core and general employment
proposals are proposed to the south of
both Kinross and Milnathort.
Page 86 of 136

Page 87

3. Baseline Data Review
Census Scotland 2011 – Method of Travel to Work and Study
All
people
Work of study
mainly at or
from home
Underground
, metro, light
rail or tram
Train Bus,
minibus
or
coach
Taxi or
minicab
Driving
a car or
van
Passenger
in a car
or van
Motorcycle,
scooter or
moped
Bicycle On foot Other
Kinross-shire 100% 14.1% 0.05% 1.2% 9.4% 0.3% 49% 8.53% 0.22% 0.75% 15.5% 0.95%
Perth and
Kinross
100% 13.8% 0.05% 1.0% 11.3% 0.5% 43.3% 8.87% 0.22% 1% 19.1% 0.86%
Scotland 100% 11.3% 0.29% 3.5% 13.4% 0.70% 40.9% 9% 0.22% 1.3% 18.48%
Key Takeawayss:
• Walking accounts for 15.5% of all travel to work and study in Kinross-shire, which suggests that there is already a significant number of short,
internal trips taken.
• There is a large percentage of Kinross-shire residents who work from home. This is likely to have increased in recent years following the covid-
19 lockdown. This emphasises the importance of locality and access to local services and amenities.
• Private car journeys (driving and passenger) account for 57.53% of travel to work/ study trips in Kinross-shire.
• Certain modes of transport are underutilised across Kinross, particularly cycling and rail, compared to their Scottish national averages.
Page 87 of 136

Page 88

3. Baseline Data Review
Census Scotland 2011 – Distance to place of work or study
Key Points:
• More than 2,000 people (around 14% of the Kinross-shire population) travel more than 20km to work/study
• 1,624 people travel less than 2km to work/study
Page 88 of 136

Page 89

3. Baseline Data Review
Collision Data - Crashmap
Key Points:
• There were a total of 88 collisions in Kinross-shire recorded by the
DfT over the last five years (2018-2023).
• Five of these incidents were classified as fatal.
• There have been three pedestrian casualties within Kinross-shire, all
of which have been around Kinross and Milnathort and were not
fatal.
• There have been ten pedal cycle casualties within the area. The crash
in Cleish which resulted in a fatality involved two cars.
Pedestrian casualty Pedal cycle casualty
Page 89 of 136

Page 90

3. Baseline Data Review
Census Scotland Datashine Commute 2011
All modes
Active travel (on foot)
• There is a significant amount of movement by all modes out of Kinross to Perth and Dunfermline as well as further afield to Edinburgh.
• There are a considerable number of long-distance commuters who are likely to travel via car or train. Page 90 of 136

Page 91

3. Baseline Data Review
NPT Scotland
• The ‘Go Dutch’ feature of the tool was used as this provides potential user numbers if a high-quality active travel route is delivered.
• There are only a few roads deemed as more then 50 on the cycle friendliness measure, which is a low-average score.
• Around the Kinross area there is the potential for around 250 people to cycle around the area daily. Page 91 of 136

Page 92

3. Baseline Data Review
Scottish Index of Multiple Deprivation 2020
• The majority of Kinross-shire is within the top three least deprived deciles on the SIMD.
• There are no areas within Kinross-shire within the most deprived (20%).Page 92 of 136

Page 93

3. Baseline Data Review
SIMD: Geographic access
Key Points:
• Scotland’s SIMD map shows that the
majority of Kinross-shire is amongst
Scotland’s most deprived 20% in relation
to geographic access (a factor that
considers travel time to key services or
public transport).
Page 93 of 136

Page 94

3. Baseline Data Review
Scottish Household Survey - Reasons to Travel (2019)
Key Points:
• The most common reason for people to travel within
Perth and Kinross is for leisure (50%) which
includes a variety of activities such as visiting
friends/relatives, shopping, sports/entertainment.
• Travelling to work was the second most common
reason for people to travel.
Source: PKC Let’s Talk Transport: Main Issues Report (2023)
Page 94 of 136

Page 95

3. Baseline Data Review
National Cycle Network – OS Maps
NCN Routes within the Kinross-shire area:
• National Route 775: connecting Perth with Bridge of Earn, Glenfarg and Kinross
using quiet rural roads. The route joins National Cycle Network Route 1 and
Coasts and Castle North along the traffic free route along Loch Leven’s shore.
• National Route 1: part of the long-distance Coasts and Castles route spanning the
United Kingdom and the North Sea Cycle Route. The route connects the Forth
Road Bridge at North Queensferry to Dundee, St Andrews, Arbroath and
Aberdeen. It runs along a mixture of traffic-free paths and quiet roads. Route 1 is
often used for both leisure and as a commuting link. Page 95 of 136

Page 96

3. Baseline Data Review
Perth and Kinross Council Cycling Open Data – Cycling Scotland (Data from 21/07/2021 – 22/03/2023)
Key Points (average daily counts):
• Cycling is most common along
the A911 in Portmoak. The
highest number of cyclists
recorded at cycle count
locations was 19.
• There were also a number of
cycle counts around Milnathort.
The highest daily counts in this
location was 17.
Page 96 of 136

Page 97

3. Baseline Data Review
Office for National Statistics: location of usual residence and place of work by method of travel to work
Key Points:
• 9,847 people commute into Perth and Kinross from other local authorities
• 13,190 people commute out of Perth and Kinross to other local authorities in the UK of abroad.
• The most common destination for residents to commute to are Dundee (36%), Fife (17%) and Edinburgh (12%).
Page 97 of 136

Page 98

3. Baseline Data Review
Street Lighting
Key Points:
• The majority of street lighting within
Kinross-shire is focussed around
Kinross, Milnathort and Glenfarg.
• As the majority of Kinross-shire’s land
area is rural uninhabited, most roads do
not have street lighting along them.
Page 98 of 136

Page 99

3. Baseline Data Review
Strava heat maps: cycling
Key Points:
• The Strava heat maps show that Muirs and around Loch Leven
are popular cycle routes within Kinross.
• The majority of cycling occurs within the villages around
Kinross-shire rather than between the villages.
Page 99 of 136

Page 100

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Appendix B
Key Stakeholder Engagement Findings
51Page 100 of 136

Page 101

Kinross-Shire Active Travel Masterplan- Engagement Session Notes
Event Date/ Time 21st March 2024, 09:30-10:30
Organisation(s) Glenfarg Community Transport Group
No. of participants  2
Introduction
Notes from introductions/Arup presentation (if any)
• Two representatives present from the Glenfarg Community Transport Group who are also
members of Glenfarg Community Council.
• The group recently undertook an active travel action plan for the area.
• Glenfarg Community Transport Group also look at walking, cycling and bus routes.
• A serious pedestrian crash near the A19 in Glenfarg was mentioned and discussed. 
• In 2023 Glenfarg Community bus service was formed and operation commenced to serve the
community.
• An estimated 800-950 people per week use the Glenfarg Community early bus service.
• Regular hourly bus services now occur as the local public bus service does not work for the
community as people don’t want to spend hours at a time in the centre of Kinross for example.
• The service operates via telephone booking service.
• HITRANS are supporting their app development.
• Currently offer a hybrid service – flexible and fixed route = hybrid.
• Currently offering a more flexible for those with mobility needs.
Key facilities, services and everyday journeys 
Prompts:
What are the key services and facilities in your community / across Kinross-shire? 
What are the typical everyday journeys that you undertake, and to which locations?
How do you undertake your everyday journeys? How far do you travel?
• The village shop is the only amenity in Glenfarg.
• Everything else involves going to Kinross (very few walk due to distance, some cycle).
• The majority of the facilities and services are in Kinross.
• The buses are small but the group would still interested in carrying bikes however don’t want
this to hold up their bus services. The buses also have a limit on weight and would need
qualified bus drivers if bikes made the bus too heavy. There are also issues surrounding
insurance. 
• Sustrans are going to provide bike racks at the village hall next to their bus stop.
Barriers to movement / key issues
Prompts:
Page 101 of 136

Page 102

What are the main barriers stopping you from travelling actively? 
Can you outline specific locations where there are barriers to movement? 
Examples may include lack of active travel facilities, poor road crossing facilities, high vehicles
speeds and poor public transport.
• People don’t want to walk in the village due to high vehicle speeds.
• Cycling and walking friendly roads don’t stop vehicle drivers from travelling at speed and
therefore there is need for traffic calming enforcement.
• Great North Road is very wide and therefore often encourages high vehicle speeds.
• Currently there is a lack of information on active travel route options.
• There needs to be a joined-up approach when providing active travel route options.
• On-street parking in Glenfarg slows the traffic down but creates a narrow footway for
pedestrians.
• Controlling the on-street parking would be good for safety etc – but there would still need to be
a plan for slowing vehicles down. 
• Pavement parking is a barrier to active travel in Glenfarg.
• Poor condition of footways is also a barrier.
• Overgrown vegetation encroaches onto the footways which narrows them. 
• Trees drop their leaves onto footways which makes them very slippery.
• Footways don’t get gritted in winter and need to be better maintained.
• Problematic junction – B996/ A91 (60mph road).
• HGVs and agricultural scale key issue in Glenfarg: could make key roads limited access?
• Rural communities often have a higher age profile which is a barrier to active travel.
• Current 40pmh shared roads are not safe and it is aspirational to think people will be going at
40mph.
• Bus stops in the area need improvements, some don’t have shelters. The group want bus stops
to provide real time information for the bus service too. 
Active travel opportunities / types of improvements
Prompts:
What do you believe are the main opportunities related to active travel in Kinross-shire / your
community? 
What types of improvements would you like to see? 
Can you outline specific locations where you would like to see improvements?
• Paint on the road: person and bike symbol is a good idea for roads around Kinross-shire.
• There is a need for parking: opportunities to use road parking to slow traffic.
• To the west of Glenfarg there is a water treatment works who are looking to receive
sponsorship from Scottish Water to get some funding to support local projects. 
Page 102 of 136

Page 103

• Opportunity to encourage people to view Glenfarg as a destination for active leisure purposes.
• Opportunity for a mobility hub at the village hall.
• Active travel routes shouldn’t stop at border and there is the opportunity to connect to existing
active travel paths on the border of Kinross-shire.
• Need to create a brand for walking and cycling around Kinross-shire.
• Would be useful to be able to hire bikes in Kinross etc from bus stops to avoid having to
carrying bikes on board.
• Opportunity to turn Kinross Park and Ride into a mobility hub.
• Opportunity to make the village hall a mobility hub. The group are interested in having a café
and bikes etc near village hall.
• Information centre near village hall: advise on walking and cycling routes.
• Bins next to bus stop.
• Potential to have walking routes through the old rail tunnels.
• Useful to have a bus stop near the Glenfarg tunnels: not currently any bus stops/facilities there. 
• National Cycle Route 775 route runs through the village: scope for this to be improved.
• There is a need for a path/ cycle route that runs to Burnside and connects to NCN Route 1: it is
currently too dangerous to walk on but a cycle route would connect to this.
• Currently paths stop between Fife and Kinross (potential for a route along the river to connect
Glenfarg to Fife).
• Formalisation of on-street parking/ reallocating parking. 
Event Date/ Time Thursday 21st March 2024, 11:30- 12:30
Organisation(s) Kinross Cycling Club
No. of participants  1
Introduction
Notes from introductions / Arup presentation (if any)
• The meeting was held with one representative from Kinross Cycling Club.
• The club has just over 200 members including ones who live outside of Kinross-shire. 
• The cycling club hasn’t been involved in active travel projects as many members feel that is a
“different type of cycling”.
• The cycling club are interested in convenience and are less bothered than others about
segregated paths etc.
Key facilities, services and everyday journeys 
Prompts:
What are the key services and facilities in your community / across Kinross-shire? 
Page 103 of 136

Page 104

What are the typical everyday journeys that you undertake, and to which locations?
How do you undertake your everyday journeys? How far do you travel?
• Employment among Kinross-shire residents is outwards: most people commute to Perth or
Edinburgh.
• Dunfermline is a popular commuting destination from Kinross-shire.
• Cyclists prefer to cycle travel by train rather than cycle then travel by bus.
• Loch Leven Community Campus in Kinross is a key facility.
• The Cycling Club start most of their rides and events from the Community Campus due to the
car parking facilities.
• The service station in Kinross tends not to be used by local residents in Kinross.
• RSPB would be a stop off destination for those doing the Loch Leven Heritage Trail.
• Off-road routes can help boost the confidence of cyclists before they go onto the roads – this
subconsciously encourages active travel.
• Confidence of cyclists is often the barrier for active travel vs active travel for leisure purposes.
Barriers to movement / key issues
Prompts:
What are the main barriers stopping you from travelling actively? 
Can you outline specific locations where there are barriers to movement? 
Examples may include lack of active travel facilities, poor road crossing facilities, high vehicles
speeds and poor public transport.
• Cycling and walking friendly roads: the signs help show people that they can ride down these
roads and should be viewed positively as they can provide confidence to riders who might be
unsure whether or not they should cycle down certain roads. The signage also makes drivers
more responsible for their speeds etc.
• Vehicle users do not like cyclists being on the road therefore a lack of designated cycling paths
within Kinross-shire is a barrier.
• Snow and ice is a barrier to cycling access in the rural areas of Kinross-shire as many of these
roads aren’t cleared of snow or gritted during the winter months (focus for this goes on the key
roads used by cars rather than active travel routes).
• M90 motorway separates the west from the east of Kinross-shire.
• Hills to the north of Kinross are a barrier to cycling.
• B9097 is an unpleasant route: very straight and therefore doesn’t feel very safe as vehicles
travel very quickly. Other areas of Loch Leven have villages etc to slow cars but this location is
rural 60mph.
• A977: viewed as one of the most dangerous roads to travel from Crook of Devon through to
Drum.
• A91 is a good route around Kinross however fast vehicle speeds often deter less confident
cyclists.
Page 104 of 136

Page 105

Active travel opportunities / types of improvements
Prompts:
What do you believe are the main opportunities related to active travel in Kinross-shire / your
community? 
What types of improvements would you like to see? 
Can you outline specific locations where you would like to see improvements? 
Examples may include dedicated active travel facilities, improved road crossings, cycle parking
and placemaking.
• 20/30mph limit in more areas of Kinross-shire. 
• Multimodal walking and cycling paths: bollards separating the two can block access for all
cyclists especially disabled users. 
• Road bump markings to section off areas from road often make roads narrower and make the
cyclist cycle closer to kerb which can be more dangerous. 
• There is a little stretch of cycleway by Balado – could this be extended?
• Could improve the Glenfarg tunnels area and create a good cycling route. 
Event Date/ Time 27th March 2024, 19:00-21:00
Organisation(s) Community Councils
No. of participants  8
Introduction
Notes from introductions / Arup presentation (if any)
Representative from the following community councils were present:
• Cleish 
• Milnathort and Orwell
• Fossoway and District (x2)
• Kinross (x3)
• Portmoak  
Key facilities, services and everyday journeys 
Prompts:
What are the key services and facilities in your community / across Kinross-shire? 
What are the typical everyday journeys that you undertake, and to which locations?
How do you undertake your everyday journeys? How far do you travel?
• Healthcare based in Dollar – for people in west Kinross-shire nearest healthcare facility is not
in Kinross-shire, it’s actually in Dollar. It is important therefore to consider cross-boundary
links. Closest train station is Alloa.
Page 105 of 136

Page 106

• There are development plans for a golf driving range, where a planning application is being
prepared.
• Tourism destinations include – Loch Leven and the castle. This should be an important
consideration in the Masterplan.
Barriers to movement / key issues
Prompts:
What are the main barriers stopping you from travelling actively? 
Can you outline specific locations where there are barriers to movement? 
Examples may include lack of active travel facilities, poor road crossing facilities, high vehicles
speeds and poor public transport.
Fossoway Representatives:
• Fossoway district has six settlements. 
• Carnbo has no public transport. Public transport services connects only six of the settlements
and is very unreliable. Services underutilised because they are unreliable. Services tend not to
run on a Sunday and the last bus out of Kinross is 17:18 in the evening therefore children can’t
do afterschool/ evening activities without access to a car. This is not promoting health and
wellbeing in our community.
• There is a lack of east to west routes. Cycle paths don’t always connect up. If the Devon Way
could extend out to Kinross that would be great.
• The cycle path from the edge of Drum towards Kinross is dangerous.
• There is a lack of local public information on where cycle paths and foot paths are. It’s all word
of mouth. Communication on existing networks is needed. 
• It’s hard for students to get from Fossoway to Perth College, people are forced into taking the
private car. 
• It is a habit to get into a car to reach facilities and amenities. Once you get to Kinross,
connectivity is much better to reach main towns and cities but east – west is an issue at present.
• B9097 from Drum to Crook of Devon – no footpath along this route so families will drive
instead of travel actively.
• There is no safe route from Carnbo to Fossoway Primary School in Crook of Devon. 
• B9097– traffic speeds are too high.
• There are sections of footpaths in middle of villages but nothing right at the extents so leaves a
lot of houses without footpaths with fast roads.
• Employment – local businesses have found that people can’t get to work as there’s no/ poor
public transport and young people who don’t have driving licenses yet would cycle but it’s too
dangerous. 
• There is not a lot of incentive for local businesses in Kinross-shire to set up as they struggle to
get staff to travel. There are poor public transport connections and lack of safe active travel
routes. 
• Safe routes for children – if you get children early thinking it’s good to walk and cycle, they
will pass this onto parents then become teenagers that walk and cycle more. There is a need to
Page 106 of 136

Page 107

incentivise young children to get used to the idea that car is not the only means of transport in
rural areas.
• For children in Rumbling Bridge that want to walk to Fossoway Primary School – no footway
along A977 to get to the school.
• New developments – in past month there has been new holiday lodges planned along A977 but
there is no active travel plan for those tourists to get into nearest village – Powmill. Local
development is not allocated in the Local Development Plan. 
• Village halls have car parks and some have play parks. Some of them don’t have safe walking
footpaths to get from village to the hall. Families and children can’t get to village halls safely.
There is also lack of safe crossings.
• Carnbo does not have a safe crossing point to the village hall.
• There is new housing development going to the west side of Powmill – you would have to walk
towards Powmill before you find a safe crossing point to cross the road. To use assets we have
in communities, better active travel infrastructure is needed.
• Arup note that village halls could be utilised as community hubs. 
• Congested areas: the section near the Muirs pub in Kinross is very congested. The participant
wouldn’t take a bicycle from Milnathort to Kinross because of congestion and parking either
side of the road. The two towns should be safely connected. This is not an attractive route for
active travel.
• There is a lack of parking facilities within Kinross and Milnathort but plenty of on street
parking. Makes road width narrow on A922.
• On-street parking in Crook of Devona and Blairingone is a barrier to active travel. Lack of
feeling safe with lack of crossing points and having to step out among parked cars.
• Arup note that parking won’t fall under this Masterplan but this will be passed onto PKC.
• Old railway lines between Rumbling Bridge and Dollar – could be turned into a footpath. There
is an old viaduct there but you would have to know where you’re going as it’s not signposted.
Could connect Rumbling Bridge into back of Blairingone then go north-west into Dollar. With
creative work it could also extend south to connect to proposed holiday accommodation near
Powmill. The network could also go towards Crook of Devon, towards Drum then towards
Kinross. 
• The lack of connectivity of all existing short active routes across Kinross is a barrier. They
don’t create a bigger strategic network at present. The core paths in Milnathort are great but
hard to get to by travelling actively. 
• Balado crossroads is unsafe. This is a 60mph speed limit section and the junction is
problematic.
• A91 in Carnbo to the crossroad to get to village hall is dangerous to cross. Also no safe
crossing point to get to Fossoway Primary School for children.
• There are regular accidents in Powmill with lorries due to steep and icy roads. 
• A977 to the east of Powmill – this designated as a walking / cycling friendly route but there’s a
blind bend and still a 60mph speed limit. Dangerous. There is a footpath on other side of
junction to get to the footpath from the walking/cycling friendly route. 
Page 107 of 136

Page 108

• A823/ A977 junction– when there are events on at Knockhill racing, motorbikes speed down
this. 
• As you come into Crook of Devon from the west, there is not a lot of visibility for people
walking and cycling.  
Cleish Representative:
• There are many roads around Cleish and Blairadam that don’t have protection for walkers or
cyclists even on roads that are marked as walking and cycling friendly. As a disabled person,
with cars going at 40mph this is not safe. Although controversial, what has happened in
Edinburgh in terms of reallocating road space, has been quite successful. Getting anywhere
from Cleish along B9097 is dangerous. Once you’re in Kinross you’re fine and connections are
pretty good. The only safe option for disabled users is car.
• Cleish towards B9097 – popular cycling route. Bends and undulations means poor visibility.
• Junction 5 on the M90 – if turning right northbound or southbound, the way that railings are set
up they obscure your view to see vehicles coming as a pedestrian. This should be an easy fix.
Kinross Representatives:
• A911 by Loch Leven Larder, there is no path near road that goes towards Milnathort.
• Kinross – Gallowhill Road has very narrow footpaths. New estate at north of Kinross c/300
houses but no safe crossing points on this road.
• Gairney Bank – B996 comes out of Milnathort and there is no footpath. Kids from here have to
get to school but can’t safely get to the bus stop as there’s no footpath.
• Link up to Kelty – path that Fife Council have done comes as far as Kelty but should be
extended towards Kelty possibly via Cleish.
• There is a lot of local knowledge of paths but not aware of any overarching map publicly
available showing all paths for walking and cycling. This needs to be available.
• Participant asked if Arup have engaged with local schools or local employers? Arup responds
that community wide survey will pick up comments on this and that is how we’re engaging
with wider stakeholders. Arup also have other resources such as Big Place Conversation to
review.
• Old train tracks – there are numerous around the area. Old track runs from south of Kinross and
good path that runs up to Sainsbury’s then missing part, then picks up again but potential to
connect path through to Milnathort and connect up to path that leads to Mawcarse. The old line
that runs out to Crook of Devon could be looked at. Between Crook of Devon to Rumbling
Bridge, there is some existing tracks that could be utilised. 
• There is a lack of cycle storage in Kinross. 
• At bottom of Kinross, there is a potential large retail development in planning that will be a
large trip attractor. Potential for an Aldi between Kinross and Milnathort. Arup to ensure these
developments are considered. 
• A977 has high vehicle speeds. A977 is major link road, used to be a trunk road. This carries
heavy goods vehicles, more so than actual trunk roads. Barriers to using paths next to the A977
because of vehicle traffic levels. Off-road path between villages along this route would be
beneficial. 
Page 108 of 136

Page 109

• Car parking – people would use their car less if they felt safe cycling and if they had
somewhere safe to store their bikes.
• Springfield Road in Kinross – bend in road and a well-used active travel route nearby. People
cross over at a dangerous junction and there needs to be a safe crossing.
• Roundabout over M90 at Kinross is a barrier to east – west movement.
Milnathort and Orwell Representatives:
• There is no footpath consistent towards Mawcarse. Would be great to join up footpaths and
cycle paths from Kinross/ Milnathort to outlying villages/settlement to encourage everyday
short journeys.
Portmoak Representative:
• There is no path to take Scotlandwell kids to primary school. Currently can’t cycle or walk
safely as path is only a foot wide.
Active travel opportunities / types of improvements
Prompts:
What do you believe are the main opportunities related to active travel in Kinross-shire / your
community? 
What types of improvements would you like to see? 
Can you outline specific locations where you would like to see improvements? 
Examples may include dedicated active travel facilities, improved road crossings, cycle parking
and placemaking.
Fossoway Representatives: 
• When travelling on paths adjacent to roads it is hard to hear electric vehicles. Segregated routes
are beneficial and essential as we move towards net zero and have increased numbers of
electric vehicles on the road. 
• Participant question- as part of desktop study have Arup looked at bus routes of school
children? Have safe zones where kids get dropped off so they can safely cross the road from the
bus. Advise Arup to look at school websites and speak to PKC for available information on
this. 
• In Rumbling Bridge, there is a small car park opposite the care home to take traffic of visitors
that come to the gorge. This is a blind spot on the A823 for people crossing and is dangerous.
• B9097 route to school is a walking route – this would benefit from some sort of restrictions to
traffic as it’s the ideal walking route to school. This also goes past Fossoway Primary School.
• There is potential development at bottom of Kinross – there is a bypass around Kinross that a
lot of people don’t use as it’s not well lit or no safe crossings. Lack of surveillance also means
people don’t have a good sense of perceived safety. The bypass (Clashburn Road/ Junction
Road) around Kinross is not a walking friendly route. Lighting improvements would be
beneficial.
• Need to also look at behaviour change initiatives.
• Connectivity from east to west means that it’s difficult to get to Kinross to connect to bus
services.
Page 109 of 136

Page 110

• There is a need to join east to west and north to south facilities up. 
• There is a need for cycle storage at Kinross Park and Ride. Richard note that this is likely to
happen soon, getting pushed through the Council at the moment. People just padlock bikes to
the trees and fences at the moment. Need sheltered and safe cycle storage.
• Safe routes for children to get to school are important and needed.
Kinross Representatives:
• Muirs pub to Springfield Road is wide down towards high street – good to look at potential for
segregated cycle path down here on A922/ B996.
• There is potential to create cycling friendly route along the Kinross bypass (Clashburn Road/
Junction Road).
• There is a lack of seating in Kinross.
• There is a clear need for cycle parking at Kinross Park & Ride.
Milnathort and Orwell Representative:
• Safe routes to school – crossing facilities across Stirling Road to get to Milnathort Primary
School is poor. A formalised crossing point would be beneficial. Segregated active travel routes
are also preferred.
• There is an opportunity to close off roads to cars to create only walking/cycling streets e.g. the
street outside of Milnathort High School. Bridgefauld Road is very busy.
• Arup note that Sustrans School Streets could be an option to look at.
Summary / Next Steps
Notes (if any)
• Horse users need to be considered too. Friction between users – walking, cycling, wheeling,
horse riding. 
• Key to note that this project belongs to the Kinross-shire Committee and every community
council should have further opportunity to feedback at a later stage. 
Event Date/ Time 3rd April 2024 19:00-20:00
Organisation(s) TRACKS
No. of participants  5
Introduction
Notes from introductions / Arup presentation (if any)
• Five members of TRACKS present during the engagement session
• TRACKS was set up as a small charity in Kinross-shire with the main aim to address the local
desire and need to have a walking and cycling path around Loch Leven. They have successfully
created this path and additional links connecting various parts of Kinross-shire. 
• TRACKS carried out an updated survey which is published on the website on the usage of the
Loch Leven Heritage Trail.
Page 110 of 136

Page 111

Key facilities, services and everyday journeys 
Prompts:
What are the key services and facilities in your community / across Kinross-shire? 
What are the typical everyday journeys that you undertake, and to which locations?
How do you undertake your everyday journeys? How far do you travel?
• The majority of key facilities are located in Kinross (e.g. healthcare centre and secondary
school)
Barriers to movement / key issues
Prompts:
What are the main barriers stopping you from travelling actively? 
Can you outline specific locations where there are barriers to movement? 
Examples may include lack of active travel facilities, poor road crossing facilities, high vehicles
speeds and poor public transport.
Problematic junctions:
• The junction where Gallowhill road meets the A91. TRACKS are currently exploring crossing
opportunities and traffic calming measures. 
• There is no crossing point along Springfield Road near where it meets Muirs (B996).
Fast moving traffic:
• There are lots of problems trying to create safe routes.
• The only access point via M90 is via Kinross, therefore all local traffic travels through Kinross
and Milnathort to access the M90.
• The main barrier to active travel between Kinross and Milnathort is high vehicle speeds.
• Although there are 20mph routes in residential parts of Kinross, there aren’t many 20mph areas
in the villages in Kinross-shire acting as a barrier to active travel.
• Burleigh Sands: crossing to the cycle path very busy and cars are all parked on the road
meaning there is poor pedestrian crossing visibility. 
• The RSPB road (B9097) is very fast. The alternative is to go via Fife however this route is not
appealing for cyclists due to the steep narrow roads.
• B9097, A911, A977, A832 are all very fast roads that don’t facilitate safe active travel routes,
and instead create barriers that make it unsafe for crossing. These roads have partial footways;,
however they don’t extend the full length of the roads and often users feel vulnerable due to the
high neighbouring vehicle speeds. 
• One representative from TRACKS is an employee near the Loch Leven Larder. They stated
that there is no safe cycling route to access the Loch Leven Larder. Many cyclists would like to
cycle but the traffic deters them. 
• Traffic volume and speeds is the main barrier.
Connections to the rest of Kinross-shire:
Page 111 of 136

Page 112

• Rumbling Bridge and area west of Kinross all have great walking routes that just need linking
together. 
• There are good active travel facilities in other neighbouring counties that would be good to link
up to and bridge the boundary gap.
Parking issues:
• It is difficult to get children onto a safe cycle route. They have to go on busy roads with cars
parked on both sides.
• On street parking: cars are often parked on both sides of the road. These are often lorries and
buses. The main road from Milnathort to Kinross is extremely busy and people often open their
car doors on you. 
• There is a shortage of public parking in Milnathort.
• Footpath width on the east side of the main street in Milnathort is very narrow. This means you
can’t travel freely in wheelchair or buggy, and they must walk in the road.
• Issues are often driven by a lack of dedicated parking. 
Lack of signposting and map routing:
• There is a lack of signposting and mapping of routes to take throughout Kinross-shire.
Other:
• Kinross high street is a cobbled area that is a shared surface. Currently it is unclear on who has
priority.
• There are only two easy access points for the Loch Leven Heritage Trail.
• National Cycle Network route takes cyclists over Cleish Hills which is not a direct route. 
• There is a lack of dropped kerbs such as those missing along connections from Milnathort to
the heritage trail.  
• The M90 cuts right through the county which is a barrier.
• The best facilities are in Kinross. Young people find it hard to access the Loch Leven
Community Campus due to no bus in the evening and no active travel route.
• Cycling home in the dark and with fast cars – there is a lack of street lighting and high vehicle
speeds, which are creating a barrier to active travel.
• New housing developments: active travel often isn’t built into these new housing
developments. 
• Balado to Milnathort: people can’t walk/cycle along A911 due to broken parts of the footway.
• There are no cycle lanes on any of the roads.
Active travel opportunities / types of improvements
Prompts:
What do you believe are the main opportunities related to active travel in Kinross-shire / your
community? 
What types of improvements would you like to see? 
Page 112 of 136

Page 113

Can you outline specific locations where you would like to see improvements? 
Examples may include dedicated active travel facilities, improved road crossings, cycle parking
and placemaking.
• There could be a pedestrian crossing added along main road in Milnathort to stop and slow the
traffic.
• There could be 20mph speed limits in residential areas.
• Improve signage and road layout would make it more obvious if a road is accessible to
pedestrians and cyclists.
• There are opportunities for traffic calming measures and crossing points.
• Perth and Kinross Council have plans to improve Station Road and Junction Road in Kinross.
• Opportunity to create additional links to the Heritage Trail.
• Opportunities to use old railway lines as active travel routes (this also diverts active travel away
from vehicle routes).
• Improve footway maintenance – lots of debris gathers on footpaths and ice during the winter
which requires improved maintenance. 
• Cutting back vegetation on footways would widen existing routes.
• Opportunity to develop a bike-bus idea.
• Improved active travel mapping.
• Create active travel connections from Kinross to Glenfarg, and Crook of Devon.
• The Heritage Trail is due to begin a programme of upgrades in 2024/2025 therefore the
Masterplan could link this to opportunities to connect to the Heritage Trail. 
Page 113 of 136

Page 114

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Appendix C
Community-Wide Survey Analysis
52Page 114 of 136

Page 115

Kinross-shire Active Travel Masterplan
Community-wide Survey Results and Analysis
Page 115 of 136

Page 116

Respondent Background Information
38%
1%
28%
31%
2%
Survey Participant's Relationship to Kinross
I live and work in Kinross-shire
I live and go to school / study
in Kinross-shire
I live in Kinross-shire and do
not work / retired
I live in Kinross-shire and work
elsewhere
I live in Kinross-shire and go
to school / study elsewhere
I work in Kinross-shire but live
elsewhere
I go to school in Kinross-shire
but live elsewhere
10%
84%
5%
Did the Respondents have any physical or mental health
conditions or illnesses that could reduce your ability to
use active travel to complete everyday journeys?
Yes, lasting or expecting to last 12
months or more and impacts my ability
to use active travel to complete
everyday journeysYes, lasting or expecting to last 12
months or more and does not impact
my ability to use active travel to
complete everyday journeysYes, lasting or expecting to last between
1 and 12 months and impacts my ability
to use active travel to complete
everyday journeysYes, lasting or expecting to last between
1 and 12 months and does not impact
my ability to use active travel to
complete everyday journeysNo
Prefer not to say
Key Findings:
• 98% of respondents live in Kinross-shire.
• 69% of respondents make daily trips out of Kinross-shire to go to school/ study elsewhere or for work.
• The majority of respondents have no physical or mental health conditions/ illnesses that could impact their ability to use active
travel.
• 15% of respondents have a physical or mental health condition or illness that impacts their travel choices. Page 116 of 136

Page 117

Respondent Background Information
66%
32%
2%
Participant’s Gender
Female Male Biological sex is female, no gender identity Prefer not to say
1%2% 5%
26%
19%
23%
19%
5%
Participant’s Age
Under 18 18-24 25-34 35-44 45-54 55-64 65 and over Prefer not to say
Key Findings:
• 66% of respondents are female and 32% male.
• The majority of respondents are aged 35 and over.
Page 117 of 136

Page 118

Most Common Mode of Travel vs Most Desired Mode
of Travel
0 20 40 60 80 100 120 140 160 180
Walk/ Wheel (e.g. scooting or use of a wheelchair)
Cycle
Bus/ coach
Car (driver)
Car (passenger)
Car sharing
Taxi
Other
Mode of Travel
How Participant's Currently Travel for Everyday Journeys vs How They Would Like to
Travel
How would you prefer to travel for everyday journeys? How do you usually travel for everyday journeys?
Key Findings:
• The majority of respondents drive when completing everyday journeys and want to keep doing this.
• 46 people want to walk/wheel when carrying out their everyday journeys compared to 32 who are currently travelling via this
mode. Page 118 of 136

Page 119

Most Frequently Visited Destinations
9%
19%
11%
11%11%
15%
12%
12%
Most Frequent Destinations Travelled To
Schools and nursery
Shops
Town centres
Places of work
Leisure facilities (e.g. sports centre)
Parks and green spaces
Visitor attractions (e.g. Loch Leven)
Visiting friends / family
Healthcare facilities
Park and Ride
Key Findings:
• The most common travel destination is to the shops, following by parks and green spaces. Visitor attractions and visiting friends and
family were also popular responses.
• The least common travel destinations were healthcare facilities and Park and Ride. Page 119 of 136

Page 120

Reasons Why Participant Choose to Travel
2% 7%
4%
7%
5%
26%
3%5%
28%
6%
7%
Participant's Main Reason for Choosing to Travel Using Their Most
Frequent Model of Transport
Cheapest
Enjoyable
Habit
Health/ fitness
Environmentally friendly
Lack of alternatives
Less stressful
Personal safety
Quickest
Reliability
Other
Key Findings:
• ‘Lack of alternatives’ and ‘quickest’ were the two main factors determining travel choice among participants.
• ‘Cheapest’ and ‘less stressful’ were the least common responses. Page 120 of 136

Page 121

The Main Barriers to Walking, Wheeling and Cycling
20%
6%
9%
20%
6%
4%
6%
6%
10%
8%
1% 2%
1% 1%
The Main Barriers to Walking, Wheeling and Cycling
Lack of existing active travel facilities (e.g. cycle
routes and footpaths)
Lack of road crossing facilities
Difficult junctions for pedestrians and cyclists
High vehicle speeds
Traffic congestion
Poor lighting
Lack of cycle parking/ storage
Convenience of other modes of travel
Travel distance
Poor public transport provision
On street parking
Accessibility
Poor road surfacing
Other
Key Findings:
• The main barriers to active travel in
Kinross-shire are deemed to be a ‘lack of
existing active travel facilities’ and ‘high
vehicle speeds’.
• Other popular barriers included ‘difficult
junctions for pedestrians and cyclists’ and
‘travel distance’.
Page 121 of 136

Page 122

Measures That Would Enable and Encourage Active
Travel
28%
8%
10%
5%5%
3%
7%
10%
4%
9%
2%
4%
5%
What Measures Would Help to Enable and Encourage More Active
Travel? Safer walking, wheeling and cycling routes (e.g.
segregated from vehicles, formal crossing points etc.)
Better/ more road crossing facilities
Better/ more cycle parking/ storage
Better lighting
More awareness of walking, wheeling and cycling
facilities
Placemaking (e.g. improvements that create a more
attractive place such as street art and planting)
Traffic-free streets/ pedestrianisation
Cycling-friendly streets
Better signage/ wayfinding
Better connections with public transport
Local initiatives (e.g. incentivisation, walking challenges
and cycle training sessions)
Benches, seating and rest places
More trees and/or greenery
Key Findings:
• The most desired measure is for
‘safer walking, wheeling and
cycling routes’ which could include
segregated active travel routes away
from vehicles and formal crossing
points.
• Other popular responses included
‘cycling-friendly streets’ and
‘better/ more cycle parking/
storage’
• The least popular responses were
‘benches, seating and rest places’
and ‘local initiatives’.
Page 122 of 136

Page 123

Specific Active Travel Improvements Respondents
Would Like to See
42
27
7
5
23
6
9
11
6
7
2
7
12
29
53
17
8
5
6
1
0 10 20 30 40 50 60
Measures to reduce vehicle speeds/ lower speed limits
Cycle lane provision
Cross-border active travel routes
Improved active travel signage
Improved footway connectivity from village to village
Improved footway connectivity within villages
Improved footway maintenance
Measures to prevent pavement parking and reduce on-street parking
Introduction of traffic management initiaves
Improved road maintenance for cyclists
Improved education/ awareness of active travel user rights in line with the Highway Code
Street lighting
Provision of off-road footways and cycle routes
Improved public transport connections/ services
Improved crossing points
Footway improvements (widen footways and improve dropped kerb provision)
Increase bike storage facilities
Connections to Loch Leven Heritage Trail
Placemaking interventions
Creation of a Kinross-shire travel app
Number of respondent mentions
Active Travel Improvements
Specific Active Travel Improvements Respondents Would Like to see in Kinross-shire
Key Findings:
• Almost one third of respondents would like to see improved crossing points around Kinross-shire.
• 42 respondents would like measures to reduce vehicle speeds implemented to enable them to travel more actively.Page 123 of 136

Page 124

Desired Locations for Measures to Reduce Vehicle Speeds
Measures to reduce vehicle speeds/ lower speed limits Areas
Mentioned
Number of Respondents
South Street (Kinross) 3
New Road (Milnathort) 4
B996 (Gairney Bank) 1
Main Street (Kinesswood) 4
Dryside (Balgedie) 1
Stirling Road (Milnathort) 3
Burleigh Road 1
Leslie Road (Scotlandwell) 3
Main Street (Scotlandwell) 3
Key Findings:
• Several locations were identified as having high vehicle speeds by respondents.
• The most frequently mentioned areas where reductions in vehicle speed limits would be welcomed are for New Road in Milnathort
and Main Street in Kinnesswood.
Page 124 of 136

Page 125

Opportunities for Cross-Boundary Active Travel
Routes
Suggested Cross-Boundary Active Travel Routes Number of Respondents
Kinross to Fife (via Kelty and Dunfermline) 10
Kinross to Perth 2
Key Findings:
• Connections between Kinross and Fife via Kelty and Dunfermline are highly desired.
• Connections to Perth were also mentioned.
• There was no mention of connections to Clackmannanshire.
Page 125 of 136

Page 126

Suggested Locations for Crossing Point Improvements
Suggested Locations for Crossing Point Improvements Number of Respondents
Springfield Road/Muirs junction crossing (relocate as currently
viewed as dangerous) (Kinross) 3
Springfield Road (by Davies Park Path) (Kinross) 3
Stirling Road  (by Milnathort Primary School) (Milnathort) 31
New Road (make zebra crossing a light controlled crossing)
(Milnathort) 2
Main Street (by Arngask Primary School) (Glenfarg) 1
B996 (by Gairney Bank) 1
Gallowhill Road/ Muirs junction (improve current crossing)
(Kinross) 2
South Street (Milnathort) 3
High Street (south) (Kinross) 1
Key Findings:
Improvements to the crossing on Stirling Road, by Milnathort Primary School is proven to be highly desired by numerous
respondents. Page 126 of 136

Page 127

Introduction
Desktop Study
Site Visit
Engagement
Masterplan
Appendices
Appendix D
Interventions and Prioritisation
53Page 127 of 136

Page 128

Intervention List
Kinross-shire active travel mapping
tool
Creation of Kinross-shire active travel mapping tool which summarises all existing walking,
wheeling and cycling routes throughout Kinross-shire. This could be used to map all existing
Kinross-shire active travel routes, then undertake a gap analysis and feasibility work with the
aim of joining up existing active travel routes.
N/A N/A
Safe Routes to School to all Kinross-
shire schools
Safe Routes to School between key settlements and all schools across Kinross-shire. This may
included signage and wayfinding, resurfacing, road markings and segregated active travel
infrastructure where feasible.
N/A N/A
Speed limit reductions in residential
locations and nearby key facilities
Traffic calming measures and lowering speed limits will make opportunities for walking,
wheeling and cycling safer and encourage greater uptake. The lowering of speed limits could
occur around residential areas, schools and healthcare facilties.
N/A N/A
Existing crossing facility improvements
Throughout Kinross-shire there are inadequate dropped kerbs and a lack of tactile surfaces at
crossing points. Therefore improvements of dropped kerbs and tactile paving are required
across all built up acreas throughout Kinross-shire.
N/A N/A
Improved signage of available active
travel routes
Clear signage and wayfinding which would make walking, wheeling and cycling routes more
visible to residents. N/A N/A
Secure cycle storage facilities at key
destinations and public transport
interchanges
Installing secure cycle storage facilities at key destinations and public transport interchanges
would encourage multi-modal transportation and offer convenient and attractive options for
cyclists using public transport.
N/A N/A
Campaign and branding for walking,
wheeling and cycling in Kinross-shire
A Kinross-shire active travel brand symbol could feature on maps highlighting walking,
wheeling and cycling routes. This should be consistent with active travel branding for Perth
and Kinross and the wider Tayside region.
N/A N/A
Improved maintenance of footways
and other active travel routes
Fallen debris and overgrown vegetation can make footways, footpaths and key cycle routes
slippery, and are often not gritted during the winter months, meaning they aren't accessible.
Numerous active travel facilities could be widened significantly by cutting back vegetation.
N/A N/A
Integrating bikes and buses
The integration of bikes and buses on public and community bus services. This may include
retrofitting buses to incorporate cycle storage, the use of bike socks and the provision of
cycle parking at bus stops and stations.
N/A N/A
Cross-boundary active travel route
between Kinross-shire and Fife
High quality active travel route along the B996 between High Street in Kinross and Black Road
in Kelty, following Cycling by Design guidance. £5,250,000 -
£10,100,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
Cross-boundary active travel route
between Kinross-shire and
Clackmannanshire
High quality active travel route along the A91 between Milnathort and Poor of Muckhart,
following Cycling by Design guidance. £9,430,000 -
£18,000,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
Active Travel Routes
Type Summary Description Cost Range Potential Funding Source
Kinross-shire Wide
Page 128 of 136

Page 129

Cross-boundary off-road active travel
route between Rumbling Bridge and
Dollar
Cross-boundary, off-road active travel route along the dissused railway line between
Rumbling Bridge and Dollar which would provide a high-quality, traffic-free active travel
facility between Kinoss-shire and Clackmannanshire.
£4,900,000 -
£9,380,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
High quality active travel route
between Kinross and Milnathort
High quality active travel route along the B996 between B918 Station Road in Kinross and
Church Street in Milnathort, following Cycling by Design guidance. £1,880,000 -
£3,610,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
High quality active travel route
between Kinross Park and Ride and
Kinross High Street
High quality active travel route along B918 between Kinross Park and Ride and Kinross High
Street, following Cycling by Design guidance. £680,000 -
£1,300,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
Active travel minor improvements
between Kinross junction and Kinross
Park and Ride
Minor improvements along existing footpath including resurfacing, wayfinding and cutting
back overhanding vegetation to provide an attractive, off-road active travel connection
between the Kinross junction and Kinross Park and Ride £49,000 - £66,000
Paths for All- Community Project
Transition Fund
Quiet street along Ochil View / Green
Road in Kinross
Quiet street which prioritises walking, wheeling and cycling and provides resident, blue
badge, delivery, and emergency vehicle access only. There provides an opportunity to reduce
through traffic (through signage improvements only), alongside traffic calming measures and
placemaking (additional cost). £5,000 - £12,000
Perth and Kinross Council Traffic
and Network Funding
Active travel minor improvements
along Gallowhill Road in Kinross
Minor improvements including footway widening, cutting back overhanging vegetation and
provision of controlled crossing points at key desire lines. £123,000 - £197,000
Perth and Kinross Council Traffic
and Network Funding
Active travel minor improvements
along Burns-Begg Street, Kirkgate and
Pier Road in Kinross
Minor improvements including active travel signage, resurfacing and and road markings. This
would provide dedicated active travel access from Kinross High Street to Loch Leven. £147,000 - £197,000
Perth and Kinross Council Traffic
and Network Funding
Sustrans School Street to Milnathort
Primary School
Sustrans School Street along Church Street providing walking, wheeling and cycling only
access to Milnathort Primary School during school pick-up and drop-off times. £3,000 - £6,000 Sustrans School Street initiative
Active travel improvements between
Scotlandwell and Kinnesswood
Active travel improvements including footway widening through Scotlandwell, widening of
Kilmagad Wood active travel facility and improved crossing facilities in Kinnesswood.
Currently there is no safe and continuous path to Portmoak Primary School from
Scotlandwell meaning those trying to access the school have to drive the short distance. £369,000 - £492,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
Active travel minor improvements
between Loch Leven's Larder and the
Loch Leven Heritage Trail.
Minor improvements including resurfacing and wayfinding which will improve active travel
accessibility between Loch Leven's Larder and the Loch Leven Heritage Trail. £24,000 - £33,000
Loch Leven Heritage Trail
Upgrades Programme
High quality active travel route
between Wester Balgedie and
Milnathort
High quality active travel route along A911 between Wester Balgedie and Milnathort via Loch
Leven's Larder, following Cycling by Design guidance. £4,000,000 -
£7,700,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
Active travel minor improvements
between Wester Balgedie and
Kinnesswood
Minor improvements to existing active travel route including signage, cutting back vegetation
and removing access barriers for inclusivity. £9,000 - £20,000
Paths for All- Community Project
Transition Fund
Footway widening through Cleish
Footway widening where feasible through Cleish to provide more space for walking and
wheeling and improve active travel access to Cleish Primary School and Cleish Village Hall. £45,000 - £62,500
Perth and Kinross Council Traffic
and Network Funding
Active Travel Routes
Page 129 of 136

Page 130

High quality active travel route
between Kinross and Crook of Devon
High quality active travel route along A977 between Kinross junction and Crook of Devon,
following Cycling by Design guidance. £6,000,000 -
£11,550,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
One-way system and active travel
improvements along Greenbank Road
in Glenfarg
One-way system and active travel improvements along Greenbank Road, including a Mixed
Traffic Street and footway resurfacing and widening where feasible. £98,000 - £132,000
Sustrans National Cycle Network
improvements and signage Fund
Improvements to the National Cycle
Network Route 775 between Glenfarg
and Milnathort
Improvements to the National Cycle Network Route 775 between Glenfarg and Milnathort
which may include resurfacing, improved road markings and signage and wayfinding.
£1,480,000 -
£1,970,000
Sustrans National Cycle Network
improvements and signage Fund
Active travel junction improvements at
the M90 / Kinross Junction
Active travel improvements including a clearly defined acive travel route, controlled crossing
facilities and clear signage and wayfinding. This intervention will improve active travel access
through the junction and east-west connectivity throughout Kinross-shire. £2,500,000 -
£2,700,000
Active Travel Transformation
Fund / Sustrans Places for
Everyone
Existing crossing improvements at
Station Road/ Junction Road junction
and Ochil View in Kinross
Crossing improvements including dropped kerbs and tactile paving and controlled crossing
facilities which deliver priority for walking wheeling and cycling. £24,000 - £250,000
Perth and Kinross Council Traffic
and Network Funding
New crossing facility along Springfield
Road in Kinross
Controlled crossing facility and improved visibility along Springfield Road to the north of
Wilson Court. £8,000 - £82,000
Perth and Kinross Council Traffic
and Network Funding
Relocate and improve existing crossing
point on Springfield Road in Kinross
Relocate and improve existing crossing point on Springfield Road at the junction by Muirs to
further down Springfield Road away from the junction. Currently the crossing point has no
tactile paving and is very close to the junction meaning pedestrians are vulnerable to vehicles
turning onto Springfield Road. £8,000 - £82,000
Perth and Kinross Council Traffic
and Network Funding
Existing crossing improvements on
Stirling Road, New Road and South
Street in Milnathort
Provision of safe crossing points for children accessing Milnathort Primary School and users
accessing Milnathort centre. £24,000 - £250,000
Perth and Kinross Council Traffic
and Network Funding
New crossing facility between
Milnathort and Mawcarse New crossing facility where the footway moves from the west to the east of the carriageway. £27,000 - £279,000
Perth and Kinross Council Traffic
and Network Funding
New crossing facility in Gairneybank Provide a safe crossing point for residents at the B996/ Hatchbank Road junction in
Gairneybank. £8,000 - £82,000
Perth and Kinross Council Traffic
and Network Funding
New crossing facility to Carnbo
community hall Crossing facility providing safe active travel access to Carnbo community hall. £8,000 - £82,000
Perth and Kinross Council Traffic
and Network Funding
Existing crossing improvements in
Glenfarg
Crossing improvements at Greenbank Road/ B996 Main Street junction and Ladeside Road/
B996 Main Street junction £16,000 - £164,000
Perth and Kinross Council Traffic
and Network Funding
Existing footbridge improvements in
Glenfarg
Footbridge improvements in line with Cycling by Design guidance, including increasing
parapet height and amending the distance between bollards for wheelchair users. £164,000 - £820,000
Transport Scotland Trunk Road
Improvements
Mobility Hub at Kinross Park and Ride
Mobility Hub at Kinross Park and Ride using COMO UK best practice. This may include
facilities such as high quality cycle storage, shared bike facilities, real-time information and
placemaking. £650,000 - £820,000
Scottish Government Place Based
Investment Programme
Active Travel Routes
Active Travel junction
/ crossing
improvements
Placemaking /
community active
travel facilities Page 130 of 136

Page 131

Portmoak Hall Village Mobility Hub Village Mobility Hub at Glenfarg Village Hall using COMO UK best practice. This may include
amenities such as a café and shared bike facilities. £246,000 - £328,000
Scottish Government Place Based
Investment Programme
Glenfarg Village Mobility Hub
Village Mobility Hub at Glenfarg Village Hall using COMO UK best practice. This may include
amenities such as a café and shared bike facilities. This could be implemented on a wider
scale across Kinross-shire £246,000 - £328,000
Scottish Government Place Based
Investment Programme
Cycle storage facility in Kinross High
Street
Currently few places where people can leave their bike should they cycle into Kinross
therefore need somewhere safe and secure for bike storage. £16,000 - £33,000
Tactran Active Travel Behaviour
Change and Access to Bikes Grant
Placemaking improvements in
Milnathort centre
Introduction of additional seating, planters and permanent cycle parking in Milnathort centre
to create an attractive environment for residents and visitors. £24,000 - £33,000
NatureScot Green Infrastructure
Fund
Loch Leven Heritage Trail footwalk
repair
Repair footwalk to the north of the Loch Leven Heritage Trail to ensure accessibility for all
users. £800 - £1,700
Loch Leven Heritage Trail
Upgrades Programme
Travel Behaviour
Change
Loch Leven Heritage Trail behaviour
change events Utilise the Loch Leven Heritage Trail to deliver behaviour change events such as cycle training
and led walks and cycle rides. £32,000 - £164,000
Tactran Active Travel Behaviour
Change and Access to Bikes Grant
Parking formalisation along South
Street in Milnathort
Parking formalisation will reduce the impact of parked vehicles along South Street on active
travel users. This will include road markings to create parking bays, and control measures,
which will require a Traffic Regulation Order. £4,000 - £8,200
Perth and Kinross Council Traffic
and Network Funding
Traffic calming along Main Street and
Leslie Road in Scotlandwell
Lowering speed limits will make opportunities for walking, wheeling and cycling safer and
encourage greater uptake. Loweing the speed limit along these roads will encourage active
travel uptake to Portmoak Primary School. £13,000 - £20,000
Perth and Kinross Council Traffic
and Network Funding
Traffic calming through Cleish centre Introduction of traffic calming measures through Cleish centre, which may include speed
cushions and vehicle activated speed signage. £3,000 - £5,000
Perth and Kinross Council Traffic
and Network Funding
Road network improvements along
B9097 between Gairneybank and
Crook of Devon
Road network improvements which would improve conditions for cyclists may including road
resurfacing, traffic calming measures and speed limit reductions through settlements. £167,000 - £251,000
Perth and Kinross Council Traffic
and Network Funding
Formalised parking and measures to
prevent footway parking in Glenfarg
Footway parking along the Main Street in particular is narrowing available space for active
travel users. £4,900 - £7,400
Perth and Kinross Council Traffic
and Network Funding
*Funding sources as of May 2024. These may be subject to change in future years
Placemaking /
community active
travel facilities
Parking and Road
Network
improvements
Page 131 of 136

Page 132

Prioritisation Criteria
Criteria Sub-criteria Low score =1 Medium score =3 High score =5
The intervention is considered to be in
alignment with less than 2 of the
masterplan objectives.
The intervention is considered to be
aligned with at least 2 of the
masterplan objectives.
The intervention is considered to be
aligned with more than 2 of the
masterplan objectives.
The intervention does not improve
connectivity to any key local facilities.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
Safe Routes to School to
all Kinross-shire schools
Safe Routes to School between key
settlements and all schools across
Kinross-shire. This may included
signage and wayfinding, resurfacing,
road markings and segregated active
travel infrastructure where feasible.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
3b. Online Community-
Wide Survey Responses
The intervention was not referenced
within the online survey responses.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The majority of the intervention is
likely to be outwith the Perth and
Kinross Council road adoption or land
ownership area, and / or requires
multiple other landowner agreements.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention is high cost
(>£1,500,000).
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
1. Alignment with Project Objectives
2. Connectivity to Key Facilities
3. Community
Engagement / Level of
community / stakeholder
support
4. Land Ownership
5. Cost
Page 132 of 136

Page 133

The intervention requires multiple
sources of funding, or there are no
identified funding sources.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention is considered to be a
longer-term aspiration which is likely
to be delivered in 3-5 years.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
The intervention has a some level of
support from the community /
stakeholders as this was referenced
during at least 1 engagement session.
Phasing
Scoring range Summary
Phase 1 33 to 40 Short-term, high priority interventions
Phase 2 25 to 32 Medium-term interventions
Phase 3 Less than 25 Long-term, low priority interventions
7. Timescales
6. Funding
Page 133 of 136

Page 134

Prioritisation Scoring and Phasing
3a. Engagement Sessions/ Big Place Conversation Responses
3b. Online Community-Wide Survey
Responses
1 Kinross-shire Wide Kinross-shire active travel mapping
tool
Creation of Kinross-shire active travel mapping tool which summarises all existing walking,
wheeling and cycling routes throughout Kinross-shire. This could be used to map all existing
Kinross-shire active travel routes, then undertake a gap analysis and feasibility work with the
aim of joining up existing active travel routes.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
2 Kinross-shire Wide Safe Routes to School to all Kinross-
shire schools
Safe Routes to School between key settlements and all schools across Kinross-shire. This
may included signage and wayfinding, resurfacing, road markings and dedicated active travel
infrastructure where feasible.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
3 Kinross-shire Wide Speed limit reductions in residential
locations and nearby key facilities
Traffic calming measures and lowering speed limits will make opportunities for walking,
wheeling and cycling safer and encourage greater uptake. The lowering of speed limits could
occur around residential areas, schools and healthcare facilties.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
4 Kinross-shire Wide Existing crossing facility improvements
Throughout Kinross-shire there are inadequate dropped kerbs and a lack of tactile surfaces
at crossing points. Therefore, improvements with dropped kerbs and tactile paving are
required across all built up areas throughout Kinross-shire.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
5 Kinross-shire Wide Improved signage of available active
travel routes
Clear signage and wayfinding which would make walking, wheeling and cycling routes more
visible to residents. N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
6 Kinross-shire Wide
Secure cycle storage facilities at key
destinations and public transport
interchanges
Installing secure cycle storage facilities at key destinations and public transport interchanges
would encourage multi-modal transportation and offer convenient and attractive options for
cyclists using public transport.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
7 Kinross-shire Wide Campaign and branding for walking,
wheeling and cycling in Kinross-shire
A Kinross-shire active travel brand symbol could feature on maps highlighting walking,
wheeling and cycling routes. This should be consistent with active travel branding for Perth
and Kinross and the wider Tayside region.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
8 Kinross-shire Wide Improved maintenance of footways
and other active travel routes
Fallen debris and overgrown vegetation can make footways, footpaths and key cycle routes
slippery, and are often not gritted during the winter months, meaning they aren't accessible.
Numerous active travel facilities could be widened significantly by cutting back vegetation.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
9 Kinross-shire Wide Integrating bikes and buses
The integration of bikes and buses on public and community bus services. This may include
retrofitting buses to incorporate cycle storage, the use of bike socks and the provision of
cycle parking at bus stops and stations.
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
1
Active Travel junction
/ crossing
improvements
Existing crossing improvements on
Stirling Road, New Road and South
Street in Milnathort
Provision of safe crossing points for children accessing Milnathort Primary School and users
accessing Milnathort centre. 5 5 5 5 5 5 5 5 40 Phase 1
2
Active Travel junction
/ crossing
improvements
Existing crossing improvements at
Station Road/ Junction Road junction
and Ochil View in Kinross
Crossing improvements including dropped kerbs and tactile paving and controlled crossing
facilities which deliver priority for walking wheeling and cycling. 5 5 5 3 5 5 5 5 38 Phase 1
3
Active Travel junction
/ crossing
improvements
Existing crossing improvements in
Glenfarg Crossing improvements at Greenbank Road/ B996 Main Street junction and Ladeside Road/
B996 Main Street junction 5 5 5 3 5 5 5 5 38 Phase 1
4 Active Travel Routes Active travel minor improvements
along Gallowhill Road in Kinross
Minor improvements including footway widening, cutting back overhanging vegetation and
provision of controlled crossing points at key desire lines. 5 3 3 5 5 5 5 5 36 Phase 1
5 Active Travel Routes
Active travel minor improvements
along Burns-Begg Street, Kirkgate and
Pier Road in Kinross
Minor improvements including active travel signage, resurfacing and and road markings. This
would provide dedicated active travel access from Kinross High Street to Loch Leven. 5 5 3 3 5 5 5 5 36 Phase 1
6 Active Travel Routes Active travel improvements between
Scotlandwell and Kinnesswood
Active travel improvements including footway widening through Scotlandwell, widening of
Kilmagad Wood active travel facility and improved crossing facilities in Kinnesswood.
Currently there is no safe and continuous path to Portmoak Primary School from
Scotlandwell meaning those trying to access the school have to drive the short distance. 5 5 5 5 3 5 5 3 36 Phase 1
7 Active Travel Routes
Footway widening through Cleish
Footway widening where feasible through Cleish to provide more space for walking and
wheeling and improve active travel access to Cleish Primary School and Cleish Village Hall. 5 5 3 3 5 5 5 5 36 Phase 1
8 Active Travel Routes Sustrans School Street to Milnathort
Primary School
Sustrans School Street along Church Street providing walking, wheeling and cycling only
access to Milnathort Primary School during school pick-up and drop-off times. 5 5 5 3 5 5 3 3 34 Phase 1
9 Active Travel Routes
One-way system and active travel
improvements along Greenbank Road
in Glenfarg
One-way system and active travel improvements along Greenbank Road, including a Mixed
Traffic Street and footway resurfacing and widening where feasible. 5 5 3 3 5 5 5 3 34 Phase 1
10
Active Travel junction
/ crossing
improvements
New crossing facility along Springfield
Road in Kinross
Controlled crossing facility and improved visibility along Springfield Road to the north of
Wilson Court. 3 3 3 5 5 5 5 5 34 Phase 1
11
Active Travel junction
/ crossing
improvements
Relocate and improve existing crossing
point on Springfield Road in Kinross
Relocate and improve existing crossing point on Springfield Road at the junction by Muirs to
further down Springfield Road away from the junction. Currently the crossing point has no
tactile paving and is very close to the junction meaning pedestrians are vulnerable to
vehicles turning onto Springfield Road. 3 3 3 5 5 5 5 5 34 Phase 1
12
Placemaking /
community active
travel facilities
Cycle storage facility in Kinross High
Street
Currently few places where people can leave their bike should they cycle into Kinross
therefore need somewhere safe and secure for bike storage. 5 5 3 3 5 5 3 5 34 Phase 1
13
Parking and Road
Network
improvements
Parking formalisation along South
Street in Milnathort
Parking formalisation will reduce the impact of parked vehicles along South Street on active
travel users. This will include road markings to create parking bays, and control measures,
which will require a Traffic Regulation Order. 3 5 5 3 5 5 5 3 34 Phase 1
14
Parking and Road
Network
improvements
Formalised parking and measures to
prevent footway parking in Glenfarg
Parking formalisation including road markings to create parking bays and parking control
measures, which will require a TRO. Footway parking along the Main Street in particular is
narrowing available space for active travel users. 3 5 5 3 5 5 5 3 34 Phase 1
15 Active Travel Routes
Active travel minor improvements
between Kinross junction and Kinross
Park and Ride
Minor improvements along existing footpath including resurfacing, wayfinding and cutting
back overhanding vegetation to provide an attractive, off-road active travel connection
between the Kinross junction and Kinross Park and Ride 5 3 3 1 5 5 5 5 32 Phase 2
16 Active Travel Routes Minor improvements between Wester
Balgedie and Kinnesswood
Minor improvements to existing active travel route including signage, cutting back
vegetation and removing access barriers for inclusivity. 5 3 3 3 3 5 5 5 32 Phase 2
17
Active Travel junction
/ crossing
improvements
New crossing facility between
Milnathort and Mawcarse
New crossing facility where the footway moves from the west to the east of the
carriageway. 3 3 3 3 5 5 5 5 32 Phase 2
18
Placemaking /
community active
travel facilities
Mobility Hub at Kinross Park and Ride
Mobility Hub at Kinross Park and Ride using COMO UK best practice. This may include
facilities such as high quality cycle storage, shared bike facilities, real-time information and
placemaking. 5 5 5 3 5 3 3 3 32 Phase 2
Phase3. Community Engagement / Level of Community and Stakeholder Support 4. Land Ownership 5. Cost 6. Funding 7. Timescales Total2. Connectivity to Key
FacilitiesIntervention Type Summary Description 1. Alignment with
Project Objectives
Page 134 of 136

Page 135

19
Placemaking /
community active
travel facilities
Loch Leven Heritage Trail footwalk
repair Repair footwalk to the north of the Loch Leven Heritage Trail to ensure accessibility for all
users. 5 3 3 3 5 5 3 5 32 Phase 2
20
Placemaking /
community active
travel facilities
Glenfarg Village Mobility Hub
Village Mobility Hub at Glenfarg Village Hall using COMO UK best practice. This may include
amenities such as a café and shared bike facilities. This could be implemented on a wider
scale across Kinross-shire 5 5 5 1 5 5 3 3 32 Phase 2
21 Active Travel Routes
High quality active travel route
between Kinross Park and Ride and
Kinross High Street
High quality active travel route along B918 between Kinross Park and Ride and Kinross High
Street, following Cycling by Design guidance. 5 5 3 3 5 3 3 3 30 Phase 2
22 Active Travel Routes Quiet street along Ochil View / Green
Road in Kinross
Quiet street which prioritises walking, wheeling and cycling and provides resident, blue
badge, delivery, and emergency vehicle access only. There provides an opportunity to
reduce through traffic (through signage improvements only), alongside traffic calming
measures and placemaking (additional cost). 5 3 3 1 5 5 5 3 30 Phase 2
23 Active Travel Routes
Improvements to the National Cycle
Network Route 775 between Glenfarg
and Milnathort
Improvements to the National Cycle Network Route 775 between Glenfarg and Milnathort
which may include resurfacing, improved road markings and signage and wayfinding. 5 5 5 3 5 1 3 3 30 Phase 2
24
Active Travel junction
/ crossing
improvements
New crossing facility in Gairneybank Provide a safe crossing point for residents at the B996/ Hatchbank Road junction in
Gairneybank. 3 3 1 3 5 5 5 5 30 Phase 2
25
Active Travel junction
/ crossing
improvements
New crossing facility to Carnbo
community hall Crossing facility providing safe active travel access to Carnbo community hall. 3 3 3 1 5 5 5 5 30 Phase 2
26
Placemaking /
community active
travel facilities
Placemaking improvements in
Milnathort centre Introduction of additional seating, planters and permanent cycle parking in Milnathort
centre to create an attractive environment for residents and visitors. 5 3 3 1 5 5 3 5 30 Phase 2
27 Travel Behaviour
Change
Loch Leven Heritage Trail behaviour
change events
Utilise the Loch Leven Heritage Trail to deliver behaviour change events such as cycle
training and led walks and cycle rides. 5 3 3 1 5 5 3 5 30 Phase 2
28
Parking and Road
Network
improvements
Traffic calming along Main Street and
Leslie Road in Scotlandwell
Traffic calming will make opportunities for walking, wheeling and cycling safer and
encourage greater uptake. Reduction of vehicle speeds along these roads will also
encourage active travel uptake to Portmoak Primary School. 3 3 3 3 5 5 5 3 30 Phase 2
29
Parking and Road
Network
improvements
Road network improvements along
B9097 between Gairneybank and
Crook of Devon
Road network improvements which would improve conditions for cyclists may including
road resurfacing, traffic calming measures and speed limit reductions through settlements. 3 3 5 1 5 5 5 3 30 Phase 2
30 Active Travel Routes
Active travel minor improvements
between Loch Leven's Larder and the
Loch Leven Heritage Trail.
Minor improvements including resurfacing and wayfinding which will improve active travel
accessibility between Loch Leven's Larder and the Loch Leven Heritage Trail. 3 3 3 1 3 5 5 5 28 Phase 2
31
Placemaking /
community active
travel facilities
Portmoak Hall Village Mobility Hub Village Mobility Hub at Portmoak Hall using COMO UK best practice. This may include
amenities such as a café and shared bike facilities. 5 3 3 1 5 5 3 3 28 Phase 2
32
Parking and Road
Network
improvements
Traffic calming through Cleish Introduction of traffic calming measures through Cleish , which may include speed cushions
and vehicle activated speed signage.
3
3 1 3 5 5 5 3 28 Phase 2
33 Active Travel Routes Cross-boundary active travel route
between Kinross-shire and Fife
High quality active travel route along the B996 between High Street in Kinross and Black
Road in Kelty, following Cycling by Design guidance. 5 3 5 5 1 1 3 1 24 Phase 3
34 Active Travel Routes High quality active travel route
between Kinross and Milnathort
High quality active travel route along the B996 between B918 Station Road in Kinross and
Church Street in Milnathort, following Cycling by Design guidance. 5 5 5 3 1 1 3 1 24 Phase 3
35 Active Travel Routes High quality active travel route
between Kinross and Crook of Devon
High quality active travel route along A977 between Kinross junction and Crook of Devon,
following Cycling by Design guidance. 5 5 5 3 1 1 3 1 24 Phase 3
36
Active Travel junction
/ crossing
improvements
Active travel junction improvements
at the M90 / Kinross Junction
Active travel improvements including a clearly defined acive travel route, controlled crossing
facilities and clear signage and wayfinding. This intervention will improve active travel access
through the junction and east-west connectivity throughout Kinross-shire. 5 5 3 3 3 1 3 1 24 Phase 3
37 Active Travel Routes
High quality active travel route
between Wester Balgedie and
Milnathort
High quality active travel route along A911 between Wester Balgedie and Milnathort via
Loch Leven's Larder, following Cycling by Design guidance. 5 5 3 3 1 1 3 1 22 Phase 3
38
Active Travel junction
/ crossing
improvements
Existing footbridge improvements in
Glenfarg Footbridge improvements in line with Cycling by Design guidance, including increasing
parapet height and amending the distance between bollards for wheelchair users. 3 3 1 1 3 5 3 3 22 Phase 3
39 Active Travel Routes
Cross-boundary active travel route
between Kinross-shire and
Clackmannanshire
High quality active travel route along the A91 between Milnathort and Poor of Muckhart,
following Cycling by Design guidance. 5 3 3 3 1 1 3 1 20 Phase 3
40 Active Travel Routes
Cross-boundary off-road active travel
route between Rumbling Bridge and
Dollar
Cross-boundary, off-road active travel route along the dissused railway line between
Rumbling Bridge and Dollar which would provide a high-quality, traffic-free active travel
facility between Kinoss-shire and Clackmannanshire. 5 3 3 3 1 1 3 1 20 Phase 3
*Funding sources as of May 2024. These may be subject to change in future years