The Scottish Government on Behalf of Drax Cruachan Expansion Limited: Electricity Act Section 36 Consultation Relevant to Construction and Operation of New Underground Power Station and Associated Infrastructure Adjacent to Cruachan 1 to Provide Up to 600 Megawatts (Mw) of Additional New Generating Capacity: Cruachan Power Station, Lochawe, Dalmally (Ref: 22/01221/S36)

Argyll and Bute Council · 15 February 2023
Back to Planning, Protective Services and Licensing Committee — 15 February 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Development & Economic Growth 
This report is a recommended response to the Scottish Government’s Energy Consents
and Deployment Unit (ECDU) Section 36 consultation regarding the proposed
expansion of Cruachan Hydro Pump Storage Power Station 
Reference No: 22/01221/S36 (ECU REF:00004492)
Applicant:  The Scottish Government on behalf of Drax Cruachan Expansion Limited
Proposal:  Electricity Act Section 36 consultation relevant to construction and operation  
of new underground power station and associated infrastructure adjacent to  
Cruachan 1 to provide up to 600 megawatts (MW) of additional new 
generating capacity
Site Address: Cruachan Power Station, Lochawe, Dalmally 
Members are requested to note that as the Planning Authority are only a Consultee in respect
of S36 Electricity Act proposals. The website containing all application documents, external
consultee responses and third party representations can be found on the Energy Consents
Unit website, operated on behalf of the Scottish Ministers at the link below: 
Scottish Government - Energy Consents Unit - Application Details 
Clicking the documents tab will open a page where the application documents, consultation
responses and third party representations/objections can be viewed. 
(A) Section 36 application made up of the following elements: 
The Proposed Development will comprise the following main elements: 
• Upper Control Works – A new intake structure would be located within and adjacent 
to the Cruachan Reservoir to direct water into a new tunnel and underground 
waterway system;
• Underground Waterway System – A series of underground shafts and tunnels 
carrying water between the upper reservoir and lower reservoir, directed through the 
underground powerhouse cavern;
• Powerhouse Cavern - A series of underground caverns containing turbines and 
generators which will use water to produce electricity;
• Substation – The existing substation compound requires to be extended in order to 
provide a suitable connection to the existing overhead circuits that connects to 
Dalmally sub-station, located some 7km to the east.
• Ventilation Shaft – A ventilation shaft will be required to circulate fresh air through the 
underground access tunnel and cavern power station complex.
• Tailrace Tunnel – A concrete-lined low-pressure tunnel will conduct water between 
the turbines and Loch Awe, the lower reservoir.
• Lower Control Works – Comprising screened inlet / outlet structure, positioned in 
Loch Awe at the end of the tailrace tunnel below the water level. These structures 
would channel water in and out of Loch Awe;

Page 2

• Quayside – Constructed on the northern shore of Loch Awe to facilitate the 
construction of the underground access tunnels, waterway system and powerhouse 
cavern, and the temporary storage of spoil prior to its off-site removal; The quayside 
would also house a canopy structure, covering the stockpiles of spoil. The canopy
structure would be enclosed on 3 sides by brick / concrete walls and have a 
corrugated roof. The primary purpose of this structure would be to prevent silt from 
stockpiles mobilised by wind /rainfall from entering Loch Awe and the surrounding 
landscape.
• Administration building - above ground administration and workshop buildings 
required for day to day operational and maintenance tasks – located on the quayside;
• Storage Buildings - above ground buildings required for storage and plant and 
equipment required for regular plant maintenance – located on the quayside
• Access Tunnels – A main access tunnel of some 1450m in length would be 
constructed to provide access to the underground power plant, close to the shore of 
Loch Awe. This will cross connect to the existing Cruachan 1 to allow personnel to 
easily move between the plants and provide a further means of access/egress. 
(ii) Other specified operations 
The following temporary works will also be required for the Proposed Development:
•  An upper site compound to be used for construction laydown and concrete 
batching plant would be established in the vicinity of the existing dam. Once 
construction work for the Upper Control Works and sub-station is complete, this 
compound would be removed and the land restored;
• A lower site compound including workers welfare will be established to the North 
East of Lochawe village, with access from the junction of the A85 and B8077 
(Stronmilchan Road) (as shown on Figure 1.1 in Appendix A). Once construction 
work is complete, this compound would be removed and the land restored. The total 
area required for this compound would be approximately 9ha; 
(B) RECOMMENDATION: 
Officers recommend that Members agree that the Council does not object,
subject to the conditions as recommended by the Planning Authority and other
consultees. 
Officers also seek Member’s authority to undertake further discussions with the
applicants and The Scottish Ministers to determine whether a planning condition
or a Section 69 agreement between parties would most effectively address the
Council’s requirement for the necessary Housing Strategy to be delivered.
___________________________________________________________________
(C) CONSULTATIONS: 
ENERGY CONSENT UNIT RESPONSES: 
NatureScot (Dated 5.7.22 & 16.1.23) No Objection subject to appropriate mitigation
measures recommended being undertaken. Previous holding Objection withdrawn. 
Response Dated 5.7.22 
The Proposal is within the Loch Etive Woods Special Area of Conservation (SAC)
and the Coille Leitire Site of Special Scientific Interest (SSSI). The Proposal could

Page 3

affect internationally important natural heritage interests and we therefore object to
this Proposal until further information is provided. This objection is due to a lack
of information in the Environmental Impact Assessment Report (EIAR) and the
supporting shadow Habitats Regulation Appraisal (HRA) of the Proposal in relation to
the Loch Etive Woods SAC. 
Response dated 16.1.23 
NatureScot had a holding objection in relation to the Loch Etive Woods Special Area
of Conservation (SAC) regarding potential impacts on the western acidic oak
woodland. Given the location of the Proposal we considered the potential impacts on
the woodland included: disturbance of the typical species, damage/ disturbance to
the typical species through the process of widening the road and generally increased
levels of noise and disturbance, and loss of qualifying habitat through the widening of
the existing road….. The Proposal is located within the Loch Etive Woods Special
Area of Conservation and the Coille Leitire Site of Special Scientific Interest (SSSI). 
The Proposal could be progressed with appropriate mitigation. However, the
Proposal could adversely affect natural heritage interests of national importance, and
we therefore object to it unless it is made subject to the measures we have identified. 
Mitigation: - The production of a Construction Method Statement, detailing road
stabilisation techniques and the retaining structures, prior to the commencement of
the Proposal. This should be agreed with NatureScot and Energy Consents Unit. 
The appraisal we carried out primarily considered the impact of the Proposal on the
following conservation objectives for the western acidic oak woodland of the Loch
Etive Woods SAC: - 
2a. Maintain the extent and distribution of the habitat within the site; - 
2b. Restore the structure, function and supporting processes of the habitat; and – 
2c. Maintain the distribution and viability of typical species of the habitat. 
Our advice in relation to the SAC above also applies to the upland oak woodland
interest of the Coille Leitire Site of Special Scientific Interest (SSSI)…. 
Glen Etive and Glen Fyne Special Protection Area (SPA) 
Our advice is that it is unlikely that the proposal will have a significant effect on the
qualifying interest either directly or indirectly. An appropriate assessment is therefore
not required. The Proposal is in a location where disturbance is unlikely and is further
mitigated by no above ground works during the breeding season. In addition, the
amount and location of habitat loss is not significant. 
Transport Scotland (TS) (Dated 25.11.22 & 9.1.23): No Objection subject to
conditions. 
In July 2022, Transport Scotland wrote to the applicant seeking clarification on a
number of areas. A meeting was held between the applicant team and Transport
Scotland to discuss the submitted information. This led to the submission of further
information by the applicant to Transport Scotland on a number of items and a further
technical meeting was held in October 2022. 
Temporary Traffic Management on A85(T) The EIAR states that construction of the
main access tunnel portal will require temporary traffic management on the A85(T). It
was initially proposed to redirect the A85(T) using a temporary build out on the loch

Page 4

foreshore, however, further information has been submitted to justify discounting this
approach due to the additional material and construction timescale required to form
this option. We note that it is now proposed to utilise the existing informal layby on the
A85(T) which is currently used as parking for the Falls of Cruachan railway station as
well as for hill walkers, to form a temporary realignment to the north of the existing
A85(T), generally as illustrated on Stantec Drawing 331201086/001/C/0862. We also
note that at a width of 4.7m, the use of this layby will result in the need for one-way
signalised shuttle workings, lasting for approximately 3-4 months. Transport Scotland
has indicated a desire for two-way operation to be retained at this location during the
construction period and discussions continue on what might be possible at this location
and the applicant is currently considering alternative options. The applicant has also
indicated that whilst traffic management is in place on the A85(T), replacement public
parking and access will be provided within the existing Visitor Centre car park. The
details of this and the provision of appropriate pedestrian linkages along and across
the A85(T) will require to be agreed. With regard to the current application, Transport
Scotland is content that this aspect is covered by a Planning Condition and that the
details of the temporary diversions and construction methodology affecting the A85(T)
will be dealt with post-consent(should planning consent be awarded). 
….We note, however, that the installation of the signals and the shuttle working has
not been subject to any RSA at this stage. Transport Scotland will require a Road
Safety Audit to be undertaken for these works and submitted to the Area Manager.
This will require to be undertaken as part of the detailed design process for the traffic
management arrangements 
Abnormal Loads Assessment An Abnormal Indivisible Loads Assessment (AILA) has
been provided within the TA. This states that it is a preliminary assessment and that
detailed AIL access route assessments will be undertaken for each required AIL at the
time of the programmed movement dates, once the specification / dimensions of those
loads are known. We note that the Port of Entry for components has yet to be finalised,
and as such, the AIL route has yet to be finalised. Potential ports and associated routes
have been identified, however, as the A85(T) and A82(T) connect directly to the site
from the east and the west, constraints on these two sections have been identified
within the AILA based upon a preliminary desktop study. This assessment has
identified numerous height, width and weight restrictions on the A85(T) and A82(T)
between Oban and Crianlarich, all of which could require further investigation and
potential mitigation. We note that the AILA states that a transformer of a similar
dimension and weight to the one assumed in the assessment was successfully
transported to Cruachan Power Station from Longannet Power Station in Fife. This AIL
was transported during the night via the M876, M9, A84(T), A85(T), A82(T) and A85(T).
This required police escort, road closures on the A82(T) between Crianlarich and
Tyndrum and the temporary reinforcement of a bridge at Inverherive. We understand
that similar measures may be required during the delivery of AILs for the current
application and these would be assessed as part of future detailed AIL assessments.
Having discussed this issue with the applicant, Transport Scotland is content that the
issue of transporting AILs can be covered by appropriate Planning Conditions. 
(Members are requested to note that the conditions requested by TS have been set
out in the Appendix A at the appropriate section relating to Transportation matters). 
Marine Scotland Science (MSS) (Dated 25.10.22) No Objection 
We advise that baseline fish population surveys should be carried out on the River
Awe and other watercourses potentially impacted from the proposed development.
Surveys should take place annually for at least 12 months prior to construction, during

Page 5

construction and for the first three years in the operational phase to monitor any
changes in the fish populations and habitat throughout the construction and operation
period. 
MSS welcome the proposed Fish Monitoring and Management Plan (FMMP) and note
that a smolt tracking study will be undertaken prior to the operational phase of the
proposed development. MSS advise that this study should commence prior to
construction taking place to gain baseline data on the outward migration of smolts from
the River Orchy via Loch Awe, past the proposed development and to continue for at
least two years of the operational phase of the development. 
MSS welcome the proposed gill netting to exploit a larger survey area and to ascertain
fish populations on both Loch Awe and Cruachan Reservoir. MSS advise that other
techniques, that are less stressful on fish populations, should also be considered e.g.
eDNA analysis. 
MSS welcome the proposed mitigation measures including the appointment of an
Ecological Clerk of Works, the use of an appropriately designed guidance system to
minimise fish swimming towards the inlet/outlet, avoiding the smolt migration period
when carrying out piling works, appropriately designed screens, controlling water
velocities at inlet/outlet screens to not exceed 0.3 m.s -1 , regular cleaning of screens
(SEPA state in their comments that fish screening will be considered at the CAR stage
of the application), limiting artificial lighting to a distance of 10 m from waterbodies, a
pollution prevention plan and a biosecurity management plan. 
MSS welcome the proposed erosion prevention and sediment control plan and
Construction Phase Surface Water management Plan the aim of which is to reduce
the impacts on water quality and prevent hydro-morphological changes to surface
water features during construction. MSS advise that these plans should also consider
the potential impact associated with the release of concrete, sediment, fuel
/hydrocarbons and acidic leachates (as highlighted by SEPA in their response) on the
water quality and fish populations. 
The resilience of fish populations to the potential impacts should be considered in the
EIA report, particularly due to the large scale of this proposal. There is good information
available on the resilience and state of the salmon population throughout Scotland 
(Additional information provided on these matters in FEI on 14.12.22) 
National Grid (Dated 8.6.22) No Objection 
No assets in the area. 
Scottish Water (Dated 10.6.22) No Objection 
There is currently sufficient capacity in the DALMALLY Water Treatment Works to
service your development. However, please note that further investigations may be
required to be carried out once a formal application has been submitted to us 
A review of our records indicates that there are no Scottish Water drinking water
catchments or water abstraction sources, which are designated as Drinking Water
Protected Areas under the Water Framework Directive, in the area that may be
affected by the proposed activity.

Page 6

Royal Society for the Protection of Birds Scotland (RSPB) (Dated 24.6.22) No
Objection 
RSPB Scotland is in broad support of the findings and proposed mitigation measures
outlined in the Applicant’s Environmental Impact Assessment Report (EIAR) and
raises no objection to the Proposed Development. 
RSPB Scotland is satisfied that appropriate avoidance and mitigation measures have
been put forward to minimise impact, and that the Habitat Restoration and
Landscape Mitigation Plan (to be produced prior to commencement of works) will
include the restoration of disturbed peat, leading to insignificant residual negative
effects. 
Further, in respect of addressing Adverse significant effects at the Site level on oak
and birch woodland (also known as Atlantic Oakwood, or Scotland’s Rainforest)
RSPB Scotland is pleased to note that both like-for-like replacement, additional tree
planting and the facilitation of natural regeneration through browser exclusion will be
outlined in the Habitat Restoration and Landscape Mitigation plan. 
Argyll District Salmon Fishery Board (Dated 28.6.22) No Objection but request
additional matters should be considered by EIA 
We welcome the inclusion of the chapters on Hydrology and Ecology which should
include Fishery management interests. However, the survey work carried out on Loch
Awe and the Cruachan Reservoir, summarised on page 119 in the report do not fully
cover our concerns of entrapment of fish, specifically salmon smolts as they migrate
past the scheme intake in spring. 
On the basis that the scheme has historically entrapped fish, we ask that this should
be considered by the EIA. This is especially important when considering that some
90 % of Atlantic salmon smolts in the catchment migrate from the River Orchy and
other tributaries around Loch Awe and will pass the intake for the scheme.
Consequently, we will need to be assured that all measures are put in place to
ensure that smolts and other fish are not drawn into the hydro scheme. 
(Additional information provided on these matters in FEI on 14.12.22) 
Scottish Environment Protection Agency (SEPA) (Dated 30.8.22 & 20.1.23)
Holding Objection based on lack of information. 
30.8.22 Response 
We have reviewed the information supplied with the EIAR and have found it to be
insufficient to allow us to determine the potential impacts. We therefore submit a
holding objection and request determination be deferred until further information is
provided in relation to hydrogeological / groundwater issues, site ecology and flood
risk as detailed in Sections 1, 4 and 5 below. We will review our position if these
issues are adequately addressed. 
Although EIAR Section 14.9.20 reports it is not anticipated there will be any barriers
to finding parties and businesses able to accept the materials we understand further
market assessment is required to identify and investigate a local market option. As
such there is no clarity on the locally viable option for the material within 5 miles.

Page 7

We support the intention produce a Site Waste Management Plan (SWMP) and that
this is to remain a live document throughout the duration of the construction period.
We request a planning condition requiring the preparation of a full SWMP once
design and contracting elements of the project are confirmed. We agree this should
build on the information provided in the EIAR and specifically, given the potential
implications for its storage and the reuse potential of the material, this will also need
to be informed by the outcome of further assessments required in relation to the
potential for the geology at the site to generate acidic leachates and acid rock
drainage as discussed in Section 1 above and Appendix 2 enclosed. 
4.1 We have concerns regarding the impact to groundwater dependent flush habitats,
in the Lower Site Compound area and throughout Upper Works (particularly down the
slopes leading into Cruachan Reservoir and down to the existing Access Track). The
mapping provided in Figures 3.3 and 3.4 of EIAR Appendix 8.1 Non-Avian Ecology
does not show the location of the flushes and the text has not made it clear how
close the flushes are to excavation areas, nor their relative position. The M10 and
M11 base-rich flushes can be assumed to be groundwater dependent, however the
groundwater dependency of other potential GWDTE habitats noted on site has not
been assessed. 
We therefore request further information be provided to: a) Assess the likelihood of
groundwater dependency of the potential GWDTE habitats which will be directly or
indirectly impacted by the development. M10 and M11 flushes are assumed to be
groundwater dependent so do not need to be included in the assessment; and b)
Illustrate the relative position of the infrastructure and excavation areas in relation to
the flushes, other groundwater dependent wetlands and wetlands valuable for nature
conservation (i.e. all levels of importance above site level). The groundwater
dependent wetlands should only be included for those assessed as being likely to be
groundwater dependent. 4.2 Given the reliance on the Habitat Restoration and
Landscape Mitigation Plan to address impacts to wetland habitats and peat we
request an outline plan is provided prior to determination for review. A planning
condition should also be applied to require the full plan to be submitted before
commencement. Damage to groundwater dependent flushes is often permanent; it is
difficult or impossible to reinstate or restore flushes after direct impact or redirection
of groundwater emergence; the HRLMP, CEMP and infrastructure layout must
consider this and address the likely outcome for these habitats, which are important
for nature conservation. 4.3 Further information must be provided on the layout of the
Lower Site Compound and the requirement to excavate at this location. The applicant
should clarify if alternative locations for the Lower Site Compound were considered, if
excavation can be avoided where peat depth is greater than 0.5 metre and if there
are flushes in the Lower Site Compound area and how will these be managed 
Therefore, a flood wall to a 1 in 100 SoP will not ensure the development will
necessarily remain operational during a 200-year event. FRA Appendix E indicates
the precise SoP is 107-year event and anything greater will overtop the proposed
wall. We therefore request the design of the flood wall is modified to ensure it is
designed and constructed to remain operational during the 1 in 200 year flood even
During the construction phase of the project it is anticipated 2.3 million tonnes of
excavated rock arisings will be produced over the 5.5 year construction period (2024-
mid 2029). EIAR Section 3.8.2 indicates that the excavation arisings will be in the
form of rock ‘chippings’ ranging from boulders to fines produced by drill and blast
techniques. It is reported that drill and blast methodology is assumed to be used for
all underground works….0.45 million tonnes of excavated material is to be reused on
site. It is proposed that 140,800 tonnes of material will be used towards the
construction of a 510m long quayside structure on Loch Awe and used in concrete

Page 8

production. The excavation arisings, 15,000 tonnes of spoil at any one time, will be
stored on the quayside structure, prior to transportation off-site by road. The arisings
will be stored under a canopy structure, enclosed on three sides to prevent runoff and
windblown silt from entering Loch Aweon for lining the tunnels. There is currently no
agreed use for the remaining excavated material. 
We also request, if you are minded to grant consent, the planning conditions detailed
in Sections 2.6 (Site Waste Management Plan), 4.2 (Habitat Restoration and
Landscape Mitigation Plan) and 4.8 (Peat Management Plan) be attached to the
consent. 
(Additional information provided on these matters in FEI on 14.12.22) 
20.1.23 Response 
Potentially Acid Generating (PAG) Rock Construction of the Cruachan Expansion
Project will require the removal and management of an estimated 2.3 million tonnes
of rock. The EIAR states it is likely some of the arisings will be Potentially Acid
Generating (PAG) rock. We previously requested more information to understand the
potential for the site geology to generate acidic leachates and acid rock drainage and
to evaluate the appropriateness of material reuse as fill materials and concrete
aggregates. The findings from the initial investigation in the submission are that some
of the material is likely or highly likely to be potentially acid generating which means
the rock arisings could potentially leach acidic leachate and mobile metals. This will
heavily influence material storage, transport, disposal and potential reuse options. 
While we agree with the applicant that an Acid Rock Drainage (ARD) Management
Plan will be required (and secured as a planning condition), there remains significant
uncertainty regarding the amount of material which will be potentially acid generating.
No information has been provided to estimate the scale of the issue. We therefore
cannot currently advise on the potential environmental effects associated with this
element of the project. 
It is likely this material will have to be segregated and disposed of at an appropriate
site (i.e. landfilled) with mitigation to prevent environmental impacts and regulation by
SEPA under the Pollution Prevention and Control (Scotland) Regime (PPC). At this
stage it is not clear what size of site would be needed and whether a suitable one
would be available to accept the material. This represents a significant environmental
risk which we expect to be addressed before determination. 
On that basis we maintain our holding objection on grounds of lack of information in
relation to the potential impacts associated with the potentially acid generating rock.
To allow us to revisit this position we require further information to outline how much
material is potentially acid generating, what will be the disposal method for it, the
environmental risks involved and the contingencies should more material than
anticipated be affected. 
Members are requested to note that Officers discussed this further holding objection
with SEPA on 22.1.23. It has been clarified that this is not an objection in principle to
the development but a technical matter they require to be satisfactorily addressed
before withdrawing their holding objection. This will be a matter for the ECU to resolve
prior to reaching their conclusion on the proposal, and is not a matter which changes
the recommendation of this report. 
Scottish Forestry (Dated 17.1.23) No Objection

Page 9

From the additional information it would appear that tree felling is limited to the removal
of individual trees associated with the Lower Works area (Loch Awe). The information
states that any trees removed will be replaced like for like and this will be detailed in a
Habitat Restoration and Landscape Mitigation Plan which will be produced prior to the
commencement of works. As the forestry works are limited, SF advise there would be
no need for a dedicated compensatory planting condition on this occasion, assuming
that the Habitat Restoration and Landscape Mitigation Plan includes the replacement
tree proposals and that the plan and its implementation are secured by a condition. 
Historic Environment Scotland (HES) (No response on ECU website) 
It is understood by Officers that additional information was sought by HES in respect
of the proposals which was included in the additional FEI submissions dated 14.12.22.
HES have been granted an extension of time to respond by the ECU to 31.1.23. Any
response provided prior to PPSL will be reported to Members. 
Defence Infrastructure Organisation/ Ministry of Defence (MOD) (Dated 18.1.23) 
This application relates to a site outside of Ministry of Defence safeguarding areas. I
can therefore confirm that the Ministry of Defence has no safeguarding objections to
this proposal. 
Please note: the above are summaries and the full external consultee responses
can be viewed on the Energy Consent Unit website. 
ARGYLL & BUTE COUNCIL INTERNAL CONSULTATION RESPONSES 
.
ABC Area Roads (20.1.23) No Objection subject to conditions. 
The proposal is situated off the A85 Oban-Tyndrum Trunk Road within a rural 60mph
speed restriction. Trunk Roads to comment on A85 issues. 
It is noted that the Trunk Road network will probably be impacted more than the local
area network. If the local area roads network is to be affected by disposal of excavated
materials for any reason then commensurate improvements may be required to
facilitate significant additional vehicle movements at the developer’s expense. 
 Information to be provided on locations for disposal of material from works,
specifically the impact on local area roads and infrastructure. Construction
Traffic Management Plan to be provided if necessary. 
 Traffic Impact Analysis required to cover any potential impact on Argyll and
Bute Council local area roads. This report should include a cumulative report
in concert with other S36 and S37 schemes in the North Argyll/ Loch Awe area
paying particular attention to the possibility of utilizing materials locally to
prevent unnecessary vehicle movements thus reducing the potential for related
deterioration of the fragile local area roads network. 
ABC Environmental Health (10.11.22) No Objection subject to conditions 
Noise and Vibration 
The noise and vibration survey identified 15 Noise and Vibration Sensitive Receptors.
The sensitivity of 11 of the 15 identified receptors has been classed as high, 10 of
which are residential sites.

Page 10

The Environmental Impact Assessment Report Volume 1 – Main Report May 2022
states that ‘surface work is expected to take place Monday – Saturday 7am -7pm and
Sundays 7am – 12pm with underground works expected to take place 24 hours a day’ 
With the number of noise and vibration sensitive receptors in the vicinity of the site, I
would suggest the following condition: 
’Surface work and underground work should be restricted to:  
• Monday to Friday: 0700 hours until 1900 hours. 
• Saturday: 0700 hours until 1700 hours. 
• Sunday / Public holidays: – no works, except for servicing and maintenance
of plant and equipment and emergency work. 
Reason: In order to protect the amenities of the area from noise and vibration
nuisance and to minimise local community annoyance” 
It is understood that a project of this magnitude may require some construction
activities to be take place outside of these hours. Environmental Health will
consider all applications for construction activities outside of these hours and
will remain flexible (without detriment to the local residents) throughout the
project. 
Private Water Supplies 
In order to protect the identified private water supplies and the residents reliant
upon these supplies; Environmental Health request that detailed information be
provided on how these 17 private water supplies will be protected during the
construction and operation phases of the proposed development. 
Reason – in the interest of public health and to ensure adequate measures are
in place to protect the identified private water supplies 
Lighting 
Artificial lighting will be used during the construction phase of the proposed
development. Mitigation measures have been identified in the Draft
Construction Environment Management plan. Environmental Health would be
satisfied as long as the mitigation measures identified are implemented. 
Similar, mitigation measures should be identified and implemented for the
operational phase of the proposed development. 
Dust 
The Draft Construction Environment Management plan has identified activities
associated with the potential to generate dust. Specific control measures have
been identified to ensure the employment of best practical means to minimise
the risk of adverse effects from construction dust. 
Environmental Health would be satisfied as long as the specified control
measures identified are implemented.

Page 11

Conclusions 
Environmental Health have no objections to the proposed development. 
ABC Conservation and Heritage Officer (Dated 29.11.22 & 23.1.23) No 
Objection subject to conditions 
29.11.22 Response 
From Figure 11.8d (visualisation in 10 years’ time) the Upper Intake/Outlet has 
a significant visual impact on the setting of the dam. Figure 11.5 (of Appendix 
11.1) touches on mitigation measures in terms of planting yet these do not 
appear to have been shown on this visualisation. However even with the 
measures proposed in 11.5 I think that the proposed form and location of the 
excavation would have an unacceptable significant adverse effect on the setting 
of the dam. 
From the section shown in Figure 3.2 it is not clear why such a large flat
hardstanding is required and if possible, this should be reduced to reduce the
impact on the landscape which forms part of the dam’s setting. 
Otherwise, alternative siting of the Upper Intake/Outlet should be considered
(to an area where less excavation is required) which would have less of an
adverse impact on the setting. 
23.1.23 Response 
Further to my previous comments below, we discussed yesterday that the
proposed structure would not be highly visible from either the ascent up towards
the B-listed Dam (where it would be screened by hill in front of it), or from higher
up Ben Cruachan (where the key views are wider views towards River Awe). 
The proposal will therefore have a limited effect on how the Dam’s setting of
Ben Cruachan is seen and experienced. Whilst it will be highly visible from the
immediate vicinity of the Dam (as per Visualisation 11.8d) it could be considered
that this location is not from where the Dam is principally viewed (which could
be considered to be from below from where, as stated above, it would be
screened). Setting also includes the experience or understanding of a place,
and this structure provides a link to the workings within the Turbine Hall below. 
However I would recommend that a Planning Condition be included in terms of
the finish of the “box” and the contouring of the rock to mitigate any adverse
effects as viewed from the immediate vicinity of the Dam. 
ABC Local Biodiversity Officer (28.11.22 & 25.1.23) No Objection 
28.11.22 Response
Having reviewed the supporting documents, I concur with the issues that NatureScot
have raised in relation to this proposal as it is within the Loch Etive Woods Special
Area of Conservation (SAC) and the Coille Leitire Site of Special Scientific Interest

Page 12

(SSSI). The proposal could affect internationally important natural heritage interests
and as such NatureScot object to this proposal until further information is provided.  I
note that the objection is due to a lack of information in the Environmental Impact
Assessment Report (EIAR) and the supporting shadow Habitats Regulation Appraisal
(HRA) of the Proposal in relation to the Loch Etive Woods SAC.
Once these issues have been resolved, I am content to provide comments as
appropriate; in the meantime, I wish that my comments are treated as a holding
response. 
25.1.23 Response
I note the contents of the latest submissions that clarify the works within the Loch Etive
Woods Special Area of Conservation (SAC) and the Coille Leitire Site of Special
Scientific Interest (SSSI). 
I concur with NatureScot’s (statutory consultee) recommendations in terms of including
conditions that reflect the proposed mitigation as well as a Construction Method
Statement which will need to be agreed in advance with the statutory consultee and
the applicant consultants and added to the Construction Environment Management
Plan. 
ABC Access Manager Response (Dated 20.1.23) No Objection 
It is important to note that the road leading up to the reservoir is heavily used by the
public walking and cycling.  If construction traffic is going to use this route it will be
necessary to consider how this is managed to ensure the safety of the public and
construction workers.  It may be necessary for construction traffic to be reduced at
weekends and during holiday periods when the greatest numbers of walkers and
cyclists are likely to be using this road.  Another major route is from Loch Awe Station
and the Cruachan Visitor Centre beside the Allt Cruachan and Falls of Cruachan to the
dam. 
Where a developer needs to exclude the public from an area of land or water to allow
construction any diversions must be for the minimum area and shortest period of time
possible.  For a project of this scale any closures will need to be planned such that
people can continue to make a circuit of Ben Cruachan and Stob Daimh throughout
the construction period.   I have assumed that some work may be required in the
vicinity of the Dam Wall which again may require walkers to use the track below the
dam and it may be necessary to provide a short section of new path to facilitate this. 
The location of the Upper Intake in particular will impact on hill walkers’ access to and
from Stob Daimh and Stob Garbh and will need to be carefully managed.  It may be
necessary to provide a temporary diversion route around the construction site and a
permanent diversion once work is complete. 
Although it is possible that I have missed it the developer must submit an Access Plan
which details how the development will impact the public’s legal rights of access during
and after the construction of the Cruachan Expansion Project.  In view of the scale and
expected duration of the construction work which will be across a number of areas
within the overall site it is likely that the plan will need to be phased.  In conclusion I
am asking that the developer is required to provide an Access Plan which must be
approved by the Council before construction can commence. 
Guidance on producing an Access Plan can be found here Microsoft Word -
A409251.doc (nature.scot) & Guidance - Good practice during Wind Farm construction
| NatureScot .  In summary the Access Plan should provide the following information.

Page 13

ABC Planning Policy Officer (dated 2/2/23): The principle of this development is
supported by Planning Policy at both Scottish Government and Local Development
Plan policy.  This is because the potential for additional pumped storage was identified
in National Planning Framework 3 published in 2014, and it has also been identified
as a National Development in the Final Draft National Planning Framework 4 which
was approved by the Scottish Parliament 11 January 2023 and is to be adopted by
Scottish Ministers and will become part of the Development Plan on 13 February 2023. 
Specifically the Cruachan Pumped Storage Project is part of the Pumped Storage
Hydro identified as a Scotland wide National Development 9 under the “Productive
Places” theme with significant potential for enhanced capacity and creation of
significant job opportunities in a rural location.  The proposal would also be supported
under NPF4 Policy 11 – Energy which sets out that “development proposals for all
forms of renewable, low carbon and zero emissions technologies will be supported”,
including energy storage, such as pumped storage hydro.  This support is subject to
an expectation that they maximise net economic impact, including local and community
socio-economic benefits such as employment, associated business and supply chain
opportunities. 
As a national development NPF4 expects the Cruachan Expansion Project to promote
a just transition to a low carbon economy and to be an exemplar of community wealth
building whereby “A people-centred approach to local economic development, which
redirects wealth back into the local economy, and places control and benefits into the
hands of local people” is promoted. 
In terms of the Argyll and Bute Local Development Plan 2015 (LDP2015), renewable
energy generation is identified as one of Argyll and Bute’s competitive advantages in
relation to economic development, and significant hydro energy developments are
shown in the Spatial Strategy diagram for Oban and Lorn (page 12).  As part of the
settlement strategy renewable energy developments are identified as one of the
specific categories of development which may be supported in Very Sensitive
Countryside in Policy LDP DM1.   The importance of creating a sustainable and
growing economy is identified in Chapter 4 of LDP2015, where renewables are
identified as one of our key growth sectors, Policy LDP 5 seeks to support the
development of new industry and business which helps deliver sustainable economic
growth throughout our area by taking full account of the economic benefits of any
proposed development.  The justification for this policy includes recognition that a
successful and vibrant economy is fundamental to retain population and attract new
people to the area.  Policy LDP 6 supports the sustainable growth of renewables where
it can be adequately demonstrated that there would be no unacceptable significant
adverse effects, whether individual or cumulative on local communities, natural or
historic environments, landscape character and visual amenity, and that the proposals
would be compatible with adjacent land uses.   
The proposed expansion of pumped storage at Cruchan is a significant development
both as a recognised national development and particularly in the context of its location
in north Argyll and in the Tobermory –Oban – Dalmally growth corridor as identified in
Proposed Local Development Plan 2.  The applicants have stated that the project will
involve “significant investment with capital expenditure in excess of £450million which
will be accompanied by associated expenditure in the local economy with local shops,
restaurants, transport providers and businesses associated with the construction and
development expected to benefit.”  They also state: “The construction of the Proposed
Development is estimated to support 357 full time equivalent jobs in Argyll and Bute
over the six-year construction programme. Job creation during construction of the
proposed development brings a huge economic benefit to the area. At the peak of

Page 14

construction, it is estimated there will be approximately 300 staff working on site, with
an average of 150 – 200 workers over the six-year programme.”   This level of capital
expenditure and the level of jobs to be created, is considerable and is likely to have a
significant impact on the local economy and communities of north Argyll. 
In particular the level of jobs that will be created during the construction period of the
project which is expected to last up to 6 years is considerable.  It will be important to
ensure that the local economy is able to benefit from these, and is not actually
disadvantaged by the increased competition for workers and most importantly the
increased demand for housing.   The Oban and Lorn housing market area, is already
one of the more pressured in Argyll and Bute, with higher levels of demand for housing,
and a higher proportion of existing housing stock being in use as short term lets to
support the important tourism sector of the local economy.   The use of temporary
accommodation, or loss of tourist accommodation to provide homes for construction
workers on the Cruachan expansion project, would have an adverse impact on local
communities and the local economy.  The applicants should therefore be asked to
provide additional information to demonstrate how they intend to address this, in order
to demonstrate compliance with development plan policy. 
The other issue which has the potential to have significant impacts on local
communities, the local road network and the local economy is in relation to the waste
material from the construction project. The applicants have stated that: “The
construction of the Proposed Development is anticipated to generate up to 2.30 million
tonnes of excavated rock arisings over the 5.5 -year construction period (2024-mid of
2029). An average of 1,600 tonnes per day with peak generation of c. 3,000 tonnes
per day.  Approximately one fifth of this material (0.45Mt) will be re-used on Site,
therefore, there will be a residual volume of 1.85 Mt of spoil which will be re-used off-
site.  During construction, approximately 15,000 tonnes spoil will be stored on the
quayside structure at any one time, prior to removal by road.”  Further information will
be required as to how this material will be handled in terms of transportation, local
reprocessing, and end use.   
Without more detail from the applicants in relation to their recruitment and
accommodation strategy for workers involved in the construction and how they
propose to deal with the hard rock waste from the construction project, compliance
with planning policy in NPF4 and the Local Development Plan is not assured and
appropriate mitigation as in the Environmental Impact Assessment Report is not
demonstrated. 
___________________________________________________________________
(D) REPRESENTATIONS: 
As this is a S36 proposal representations must be sent to the ECU and not the
Planning Authority. In respect of Public Representations the Energy Consents unit at
time of writing three representations/objections have been lodged to the proposals by
the following parties: 
 Nigel MacBeath 1 Railway Cottage Falls of Cruachan Argyll PA33 1AW 
Concerns over impact of construction on residential amenity (Objection) 
 Andreas Wolff 25 St Conans Rd Lochawe PA33 1A

Page 15

Concerns over impact of development and movement of spoil on St Conans Road
(clarifies that does not object to proposals) 
 Lorraine McFee, Brae House, Kilchrenan Argyll PA35 1HD, 
Proposals are not compliant with UK energy policy which does not reference pump
storage. Financial case has not been properly justified by applicant and proposal will
cause unacceptable harm and disruption to the local community. 
The above matters will be for the Scottish Ministers to consider in determining the
application.  However having read the submissions, Officers are content that there are
no substantive planning matters raised within them which would alter the
recommendation of this report to Members, as either they are not material planning
considerations or can be addressed through the imposition of appropriate conditions
on any deemed planning consent issued by the Scottish Ministers in accordance with
recommendation. 
Note: please note that the letters of representation above have been summarised
and that the full letters of representations are available on the Energy Consents
Units website at the link previously provided in this report.
___________________________________________________________________ 
(E)  SUPPORTING INFORMATION 
Has the application been the subject of:
i) Environmental Impact Assessment Report (EIAR): Yes 
EIAR (May 2022) comprising:   
 Volume I: Main Report
 Volume II: Figures and Appendices
 Volume III: Technical Appendices; 
 Volume IV: Non-Technical Summary (NTS) 
Key matters covered in the EIAR include: 
 Flood Risk Assessment; 
 Loch Awe Water Levels Report; 
 Species Reports: Bat, Otter, Ornithology, Fisheries, Badger, Red Squirrel, Pine
Martin; 
 Ecological Constraints Plan; 
 Habitats Regulation Assessment; 
 Transport Assessment; 
 Draft Construction Traffic Management Plan; 
 Noise Monitoring; 
 Draft Peat Management Plan; 
 Cultural Heritage Assessment; 
 Listed Buildings Consent; 
 Draft Construction Environmental Management Plan; 
 Schedule of Mitigation; 
 Planning Statement; 
 Design Statement; and

Page 16

 Statement of Consultation and Engagement. 
Further Environmental Information (FEI) (December 22) comprising: 
Further Information was provided on 14.12.22 in response to matters raised in
consultation responses to the initial EIAR related to the following headings. 
 Ground Conditions
 Cultural Heritage
 Transport and Access
 Scottish Forestry
 BT
 Argyll and District Salmon Fisheries Board
 Public Representations 
ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994: If required – this will be undertaken by the ECU as the Determining
Authority in this case.   
iii) A design or design/access statement:   Yes Design Statement within EIAR 
iv) A report on the impact of the proposed development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage impact etc.: All relevant reports are
encompassed within the EIAR and additional FEI submissions. 
Members are requested to note that a more recent policy update dated 20.1.23 has
been submitted by the applicant to address NPF 4 which comes into force on 13.2.23
as a statutory development plan. This has been placed on the Council website. 
(F) Local Development Plan (LDP) and any other material considerations over and
above those listed above which have been taken into account in the assessment
of the application: 
Members are asked to note in the context of the Local Development Plan (LDP) and
planning process that this application has been submitted to the Scottish Government
under Section 36 (S36) of the Electricity Act 1989.  As part of the S36 application
process, the applicant is also seeking that the Scottish Ministers issue a Direction under
Section 57 (2) of the Town and Country Planning (Scotland) Act 1997 that deemed
planning permission be granted for the proposal.  In such instances, the LDP is not the
starting point for consideration of S36 applications, as Sections 25 and 37 of the Town
and Country Planning (Scotland) Act 1997 which establish the primacy of LDP policy in
decision-making, are not engaged in the deemed consent process associated with
Electricity Act applications.  Nonetheless, the adopted Argyll & Bute LDP 2015 still
remains an important material consideration informing the Council’s response to the
proposal. 
Schedule 9 of the Electricity Act does require both the applicant and the decision-maker
to have regard to the preservation of amenity.  It requires that in the formulation of
proposals the prospective developer shall have regard to:

Page 17

(a) the desirability of preserving natural beauty, of conserving flora, fauna and
geological or physiological features of special interest and of protecting sites,
buildings and objects of architectural, historic or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals
would have on the natural beauty of the countryside or on any such flora, fauna,
features, sites, buildings or objects. 
Similarly, it obliges the Scottish Ministers in their capacity as decision maker to have
regard to the desirability of the matters at a) and the extent to which the applicant has
complied with the duty at b).  Consideration of the proposal against both the effect of
SPP (2014), NPF 3, the adopted Argyll & Bute LDP 2015 and as from 13.2.23, revised
Draft NPF 4, will ensure that proper consideration is given by the Council to the extent
which the proposal satisfies these Schedule 9 duties. 
As of 13 February 2023 The Scottish Ministers will be required to consider National
Planning Framework 4 (NPF4) and the policies and objectives contained therein which
are referenced elsewhere in this report in terms of their materiality to the determination
of the current proposals. 
It is fair to summarise that this is a period of transition in respect of NPF 4, and therefore
the interpretation and application of not only the policies of NPF 4 but also the wider
objectives contained therein, are still subject to consideration by Officers as to how these
ambitions can be delivered in a competent manner. The interaction of the current S36
application, determined under the Electricity Act, not the Planning Acts, (but with a
deemed planning consent issued to the Planning Authority for compliance) raises new
and potentially complex procedural and policy matters which are still in a period of
transition. 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
Argyll & Bute Local Development Plan (2015) 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
LDP 5 – Supporting the Sustainable Growth of Our Economy 
LDP 6 - Supporting the Sustainable Growth of Renewables 
LDP 8 – Supporting the Strength of Our Communities
LDP 9 – Development Setting, Layout and Design
LDP 10 – Maximising our Resources and Reducing our Consumption
LDP 11 – Improving our Connectivity and Infrastructure 
Supplementary Guidance to the Argyll & Bute Local Development Plan 2015 & 2016 
SG LDP ENV 1 – Development Impact on Habitats, Species and Our Biodiversity (i.e.
biological diversity)
SG LDP ENV 2 – Development Impact on European Sites 
SG LDP ENV 4 – Development Impact on Sites of Special Scientific Interest (SSSIs)
and National Nature Reserves 
SG LDP ENV 6 – Development Impact on Trees / Woodland
SG LDP ENV 7 – Water Quality and the Environment

Page 18

SG LDP ENV 11 – Protection of Soil and Peat Resources
SG LDP ENV 13 – Development Impact on Areas of Panoramic Quality (APQs)
SG LDP ENV 14 –Landscape
SG LDP ENV 16(a) – Development Impact on Listed Buildings 
SG LDP PG 1 – Planning Gain
SG LDP BAD 1 – Bad Neighbour Development
SG LDP Sustainable - Sustainable Siting and Design Principles 
SG LDP SERV 5 – Waste Related Development and Waste Management 
SG LDP SERV 6 – Private Water Supplies and Water Conservation
SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for Development
SG LDP TRAN 1 – Access to the Outdoors
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
Supplementary Guidance 2 (December 2016) 
Note: The above supplementary guidance has been approved by the Scottish
Government. It therefore constitutes adopted policy and the Full Policies are
available to view on the Council’s Web Site at www.argyll-bute.gov.uk 
(ii) List of other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A. 
 National Planning Policy Framework, Scottish Government (NPF3 (June 2014) and
Revised Draft NPF4 (to come into force on 13.2.23)
 Scottish Planning Policy (SPP), Scottish Government (June 2014)
 Planning Advice Notes & Web-based Renewables Guidance
 Renewable energy and climate change framework
 Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
 The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017)  and position Update dated 16.3.21 
 Scotland’s Draft Energy Strategy and Just Transition Plan and Ministerial
statement  (Dated 10.1.23)
 The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
 Views of statutory and other consultees;
 Planning history of the site
 Legitimate public concern or support expressed on relevant planning matters 
 Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
unchallenged policies and proposals within pLDP2 may be afforded significant
material weighting in the determination of planning applications at this time as the
settled and unopposed view of the Council. Elements of the pLDP2 which have
been identified as being subject to unresolved objections still require to be subject
of Examination by a Scottish Government appointed Reporter and cannot be
afforded significant material weighting at this time. The provisions of pLDP2 that
may be afforded significant weighting in the determination of this application are
listed below: 
 Policy 14 – Bad Neighbour Development
 Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes
 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing Private
Road

Page 19

 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 40 – Vehicle Parking Provision
 Policy 43 – Safeguarding of Aerodromes
 Policy 58 – Private Water Supplies and Water Conservation
 Policy 63 – Waste Related Development and Waste Management 
National Energy Policy Framework as a material planning consideration 
Energy Policy Framework 
Statutory and policy requirements at UK and Scottish level to mitigate climate
change and increase renewable energy generation are informed by higher level
international agreements, primarily the Paris Agreement (2015) which commits
United Nations signatory countries to take action to cut carbon emissions and
emphasises the aim of restricting temperature rises to below 2°C above
preindustrial levels. At the UK level, action to tackle climate change is underpinned
by the Climate Change Act 2008 as amended by the Climate Change Act 2008
(2050 Target Amendment) Order 2019. A range of policy documents set out the
UK Governments binding commitments to cut carbon emissions through the
deployment of renewable energy, including the UK Government’s Ten Point Plan
for a Green Industrial Revolution (2020), Energy White Paper (2020), Carbon Plan
(2011), the UK Renewable Energy Roadmap (2011) (updated 2012 and 2013) and
the British Energy Security Strategy. 
More recently the publication of Scotland’s Draft Energy Strategy and Just
Transition Plan and the accompanying Ministerial statement (Dated 10.1.23)
further reinforces the importance of achieving net zero and addressing the Climate
Emergency. 
Planning 
At a national level, planning policy relevant to the determination of the application
for consent comprises National Planning Framework 3, the Scottish Planning
Policy 2014 and the revised draft National Planning Framework 4. (which will come
into force on 13.2.23). NPF 4 will then supersede NPF 3 and SPP 2014. 
The Policies of NPF4 of most direct relevance to the current proposals are set out
below: 
1. Tackling the climate and nature crises
2. Climate mitigation and adaptation
3. Biodiversity
4. Natural places
5. Soils
6. Forestry, woodland and trees
7. Historic assets and places
11. Energy
12. Zero waste
25 Community Wealth Building 
The national policy position in both documents contains a presumption in favour of
development that contributes to sustainable development; coupled with support for
the delivery of renewable energy generation capacity, including energy storage

Page 20

projects at a range of scales. Support for such schemes feeds into policy
consideration and guidance at all levels, in recognition of the wide range of benefits
they offer. 
NPF3 and NPF 4 identify pump storage hydro schemes (PSH) as key assets to
achieve these objectives and recognises that increasing the capacity of PSH can
complement ambitions for more renewable energy capacity. The expansion of
Cruachan is specifically cited as being amongst the most advanced plans for new
PSH schemes. 
The emerging policy position as drafted for consultation in NPF4, takes this support
further towards delivery, working from a baseline focussed on tackling climate
change and setting a target of net zero emissions by 2045, with significant progress
required by 2030. In the revised draft NPF4, under “Productive Places” the
Cruachan Expansion project is specifically listed as a Scotland Wide National
Development: 9. Pumped Storage Hydro. Ben Cruachan at Loch Awe is named as
the initial focus of the PSH capability, with an all-Scotland intention thereafter. This
will be further reinforced when NPF4 forms part of the development plan framework
on 13.2.23. 
Officers accept and ask members to note that there is robust high level
Energy/Climate Change policy and National planning policy support for the current
proposals. This is considered to be a substantive material consideration, however
this does not undermine the need for the proposals to address the other policy
objectives of NPF4 which, although supporting the proposals, requires other issues
such as biodiversity improvements, Socio Economic benefits, and “Just Transition”
to be considered in a balance of judgement on compliance with the overall
objectives of NPF 4..
___________________________________________________________________ 
Does the Council have an interest in the site: No 
(G) Is the proposal consistent with the Local Development Plan: Yes
___________________________________________________________________ 
Author of Report:   David Moore   Date:  27.1.23 
Reviewing Officer:   Sandra Davies  Date:  31.1.23 
Fergus Murray 
Head of Development and Economic Growth

Page 21

APPENDIX A – PLANNING LAND USE AND POLICY ASSESSMENT 
A. THE SECTION 36 CONSENTING REGIME 
In Scotland, any proposal to construct, extend, or operate an onshore electricity generating
station, in this case, a pump storage hydro, with a capacity of over 50 megawatts (MW),
requires the consent of Scottish Ministers under section 36 of the Electricity Act. Such
applications are processed on behalf of the Scottish Ministers by the Energy Consents Unit
(“ECU”) Scottish Government - Energy Consents. Section 57(2) of the Town and Country
Planning (Scotland) Act 1997 (“TCP(S)A”) also allows the Scottish Ministers, on granting
consent under section 36, to direct that planning permission for that development shall be
deemed to be granted, subject to such conditions (if any) as may be specified in the direction. 
The consultation bodies to be consulted by the Scottish Ministers on Section 36 applications
are the relevant planning authority, NatureScot, SEPA, Transport Scotland and HES and any
other relevant public bodies with specific environmental responsibilities or local and regional
competencies who the Scottish Ministers consider are likely to have an interest.  The Council’s
role in this process is therefore one of a consultee along with various other consultation bodies.
It is open to the Council to either support or object to the proposal, and to recommend
conditions it would wish to see imposed in the event that authorisation is given by Scottish
Ministers. 
In the event of an objection being raised by the Council, the Scottish Ministers are obliged to
convene a Public Local Inquiry (PLI) if they are minded to approve the proposal. They can
also choose to hold a PLI in other circumstances at their own discretion. Such an Inquiry would
be conducted by a Reporter(s) appointed by the Directorate for Planning and Environmental
Appeals. In the event that consent is given, either where there has been no objection from the
Council, or where objections have been overruled following PLI, the Council as Planning
Authority would become responsible for the agreement of matters pursuant to conditions, and
for the ongoing monitoring and enforcement of such conditions contained in any issued
“deemed planning consent”. Any decision notice would have a Part 1” List of conditions for the
ECU to discharge and a “Part 2” deemed planning permission where the Planning Authority
(often in consultation with other statutory consultees) will be required to consider and
discharge the conditions. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish Government
along with other internal consultations undertaken by the Council, and 3rd party opinion
expressed to the Scottish Government following publicity of the application by them. It
recommends views to be conveyed to the Scottish Government on behalf of the Council before
a final decision is taken on the matter.   
B. SETTLEMENT STRATEGY 
Policy LDP 6 of the Adopted Local Development Plan sets out the Council’s Policy for
renewable energy developments, in accordance with SPP 2014.  In addition, there is also the
Supplementary Planning Guidance.  SPP 2 contains a Spatial Framework which has been
prepared in accordance with SPP 2014.   
In terms of the Local Development Plan Settlement Strategy, the main site is located within a
combination of, Lorn and the Inner Area very sensitive countryside, North Argyll APQ and Glen
Etive and Glen Fyne Special Protected Area, subject to the provisions of LDP policy LDP DM
1.  In principle, policy LDP DM 1 supports renewable energy and ancillary developments of
this type in these areas, providing they are consistent with all other Local Development Plan

Page 22

Policies.  It is the conclusion of Officers that this proposal satisfies the relevant local and
national planning policy in respect to pumped storage hydro as detailed in the various sections
of this report, subject to the ECU considering the pre-determination matters and conditions
detailed in this report. 
Having due regard to the above it is considered that the proposal is consistent with the
provisions of LDP DM1 – Development within the Development Management Zones;
SPP (2014); NPF 3 and Revised Draft NPF4 
.
C. SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES 
Argyll & Bute Council is keen to ensure that Argyll & Bute continues to make a positive
contribution to meeting the Scottish Government’s targets for renewable energy generation. 
These targets are important given the compelling need to reduce our carbon footprint and
reduce our reliance on fossil fuels, reinforced by the Climate Change (Emissions Reduction
Targets) (Scotland) Act 2019. The Council will support renewable energy developments where
these are consistent with the principles of sustainable development and it can be adequately
demonstrated that there would be no unacceptable significant adverse effects. 
Statutory and policy requirements at UK and Scottish level to mitigate climate change and
increase renewable energy generation are informed by higher level international agreements,
primarily the Paris Agreement (2015) which commits United Nations signatory countries to
take action to cut carbon emissions and emphasises the aim of restricting temperature rises
to below 2°C above preindustrial levels. 
At the UK level, action to tackle climate change is underpinned by the Climate Change Act
2008 as amended by the Climate Change Act 2008 (2050 Target Amendment) Order 2019. A
range of policy documents set out the UK Governments binding commitments to cut carbon
emissions through the deployment of renewable energy, including the UK Government’s Ten
Point Plan for a Green Industrial Revolution (2020), Energy White Paper (2020), Carbon Plan
(2011), the UK Renewable Energy Roadmap (2011) (updated 2012 and 2013) and the British
Energy Security Strategy. 
At a national level, planning policy relevant to the determination of the application for
consent comprises National Planning Policy Framework 3, the Scottish Planning Policy 2014
and the draft National Planning Policy Framework 4. 
The national policy position contains a clear presumption in favour of development that
contributes to sustainable development; coupled with support for the delivery of renewable
energy generation capacity, including energy storage projects at a range of scales. Support
for such schemes feeds into policy consideration and guidance at all levels, in recognition of
the wide range of benefits they offer. 
NPF3 identifies hydroelectric power as a key asset and recognises that increasing the
capacity of PSH can complement ambitions for more renewable energy capacity. The
expansion of Cruachan is specifically cited as being amongst the most advanced plans for
new PSH schemes and the relationship with Cruachan 1 is noted. In the draft NPF4, under
“Productive Places” the Cruachan Expansion project is specifically listed as a Scotland Wide
National Development: 9. Pumped Storage Hydro. Ben Cruachan at Loch Awe is named as
the initial focus of the PSH capability, with an all-Scotland intention thereafter. This will be
further reinforced when NPF4 forms part of the development plan in due course.

Page 23

The inclusion of the currently proposed Cruachan expansion in both NPF3 and NPF 4 as an
important National Planning and climate priority is acknowledged and in Officers opinion
must be regarded as a strongly supportive framework for the principle of the approving the
current proposals. 
D. LOCATION, NATURE AND DESIGN OF PROPOSED DEVELOPMENT 
Background – 
The Proposed Development will be located on land around and to the east of the existing
Cruachan pumped storage hydro power station (‘Cruachan 1’) on the northern banks of Loch
Awe.  Cruachan 1 is a pumped storage hydro-electric facility and one of four large-scale
pumped storage facilities in the UK. It currently operates with a nominal maximum output of
440 MW in full generation mode with an average annual generation output of circa 300
GWh/year. The current facility comprises the following main components: 
 Cruachan Reservoir (upper head pond); Gross storage 11.1 million m3; live storage
8.47 million m3; 
 Energy storage in upper head pond of 6.7 GWh per cycle; 
 Twin 4.6 m diameter headrace tunnels that bifurcate to four steel-lined unit penstocks; 
 Underground cavern power station housing 2 x 100 MW and 2 x 120 MW reversible
Francis pump-turbines and motor-generators; and 
 Single 6.8 m horseshoe shaped tailrace tunnel and inlet/outlet structure on the bank of
Loch Awe. 
The reservoir receives natural inflows from its 5.7 km2 direct catchment and is supplemented
by a series of indirect catchments that discharge at three principal locations around the
shoreline of the upper reservoir. 
Cruachan 1 opened in 1965. Its design by James Williamson responded to the challenge of
developing a nationally significant power station in an area renowned for scenic beauty with
two monumental and pioneering pieces of civil engineering. The turbine hall is concealed deep
underground, minimising the visual impact of the scheme, whilst the buttressed dam, sitting
back from the entrance to Coire Cruachan, appears almost a part of the landscape, the angle
of the buttresses being close to that of the adjacent slopes. All the operational equipment is
contained within the dam to negate the need for towers 
The Site -. 
The Site encompasses the existing Cruachan 1 facilities, including Cruachan Reservoir, the
underground power station, and the visitor centre. Existing private and public roads which
connect the A85 to Cruachan Reservoir (including St Conan’s Road), a small section of the
A85, Falls of Cruachan railway station, part of the Oban to Glasgow railway line, and parts of
Loch Awe also lie within the boundaries of the Site. 
Cruachan Reservoir, which provides the upper reservoir of Cruachan 1, is located within a
natural coire on the southwest facing slope of Ben Cruachan. The reservoir is impounded by
a concrete mixed gravity and buttress dam across the natural outlet to the Allt Cruachan Burn.
A path around the reservoir is part of the route used by the public to access the summit of Ben
Cruachan. 
A more detailed description of the site and surroundings is contained within the EIAR at
Chapter 2

Page 24

The Proposal 
The Proposed Development seeks to optimise use of the existing Cruachan Reservoir and
Dam through development of a new underground power station and associated infrastructure
adjacent to Cruachan 1 to provide up to 600MW of additional new generating capacity. The
Proposed Development will be operated independently of the existing 440 MW Cruachan 1.
Both power stations will use Loch Awe as the lower reservoir and Cruachan Reservoir as the
upper reservoir.  The construction process will take place over an estimated 65-month
programme to achieve commercial operation of the first generating unit.   
A full description of the main elements of the Proposed Development is provided in the EIAR
Volume 1 at Chapter 3 and at Section A of this report. The submitted EIAR contains
information and technical appendices in respect of the following matters: 
 Flood Risk Assessment; 
 Loch Awe Water Levels Report; 
 Species Reports: Bat, Otter, Ornithology, Fisheries, Badger, Red Squirrel, Pine Martin; 
 Ecological Constraints Plan; 
 Habitats Regulation Assessment; 
 Transport Assessment; 
 Draft Construction Traffic Management Plan; 
 Noise Monitoring; 
 Draft Peat Management Plan; 
 Cultural Heritage Assessment; 
 Listed Buildings Consent; 
 Draft Construction Environmental Management Plan; 
 Schedule of Mitigation; 
 Planning Statement; 
 Design Statement; and 
 Statement of Consultation and Engagement. 
A major component of the Proposed Development is the generation of spoil from excavation
of new tunnels and the powerhouse cavern during construction. The construction of the
proposed development is anticipated to generate up to 2.30 million tonnes of excavated rock 
over the 5.5 -year construction period (2024-mid of 2029). An average of 1,600 tonnes per
day with peak generation of c. 3,000 tonnes per day. The excavated materials will be in the
form of rock ‘chippings’ ranging from boulders to fines produced by drill and blast techniques. 
Approximately one fifth of this material (0.45Mt) will be re-used on Site. Therefore, there will
be a residual volume of 1.85 Mt of spoil which will require to be removed off-site for use
elsewhere. 
The primary re-use for spoil on site will be the quayside structure in Loch Awe. It has a depth
of about 12 m and a length of 510m. It will require approximately 162,500 tonnes spoil, 21,700
tonnes which will be imported to form the initial tunnel access and 140,800 tonnes will be from
excavated materials produced in forming the access tunnel. 
The EIAR further confirms that up to 15,000 tonnes spoil will be stored on the quayside
structure at any one time, prior to removal by road. The material would be stored under a
temporary canopy structure, enclosed on three sides which would prevent runoff and wind-
blown silt from entering Loch Awe. 
The applicants have confirmed that for assessment purposes this EIAR has assumed a worst
case that 100% of residual spoil is transported by road both to the east and west on the A85

Page 25

and that the potential likely significant effects of spoil movement have been covered in more
detail throughout the EIA Report, and specifically in Chapters 7 – Hydrology, 9 – Traffic,
Transport and Access, Chapter 10, Noise and Vibration, and Chapter 14 – Waste
Management. 
Approximately 9ha of compound area will be required close to the Site. This will most likely be
within an area of land to the east of the project, to the north of the B8077, close to Castles
Farm. 
Having due regard to the above the proposals scale of contribution to renewable energy
generation targets has been assessed and it is concluded that the proposal is
consistent with the provisions of National Energy Policy SG 2; Supplementary LDP
STRAT 1 – Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 6 - Supporting the Sustainable Growth of Renewables; SPP
(2014); NPF 3 and Revised Draft NPF4 Policies 1,2 and 11 
E. IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING RESIDENTIAL
AMENITY, and NOISE (INCLUDING CUMULATIVE IMPACTS). 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against
impacts on communities and individual dwellings, including visual impact, and noise. 
The EIAR  has identified potentially sensitive visual receptors within the study area comprise
residents or others present in and around buildings and settlement areas, those using routes
(including transport and recreational routes) through the study area, and those obtaining views
from outdoor locations where enjoyment of the view is one of principle reasons for being at
the location. 
Residential Receptor Locations (RRLs) are identified and described in detail in Technical
Appendix 11.2 of the EIAR and their locations are shown on Figure 11.4. The EIAR identifies
these receptor locations as contained in four general areas:  
 To the east of Loch Awe;
 Along the northern shoreline of Loch Awe;
 To the west of Loch Awe; and
 Along the southern shoreline of Loch Awe. 
23 building-based receptor locations were included in the visual assessment (as set out at
Figure 11.4), comprising individual buildings or groups of buildings, and associated outdoor
spaces where a view of the Proposed Development would potentially be obtained. 
The assessment (see Technical Appendix 11.2) has identified that the majority of effects to
receptors would be not significant. During construction, temporary significant effects were
identified for three of these receptor locations with visual receptors in all other locations
identified as likely to experience effects which would be not significant In respect of the main
and permanent works to create the underground turbine hall and associated above ground
permanent structures near the dam. 
Officers are in general agreement with these evaluations and do not consider that any
unacceptable amenity impacts upon settlements or individual properties will occur after the
construction stage of the proposals have finished. Clearly temporary impacts associated with
construction works will be of a greater magnitude and the construction compounds and new
quayside loading area will require to be designed and landscaped in a manner which

Page 26

minimises transient impacts upon the area which is both attractive and well used by tourists. 
The EIAR contends that during operation, views from all building-based receptor locations
would be not significant, because the levels of activity and footprint of the Proposed
Development would be reduced, and proposed reinstatement and mitigation measures would
lead to permanent features appearing less noticeable and detracting in views. The detailed
assessment of all building-based visual receptor locations during the operational phase is
included in Technical Appendix 11.2. Officers are in agreement with these conclusions. 
Officers accept that although some significant visual impacts will occur from some vantage
points, and as accepted in the EIAR, these will not be significant in respect of the operation
of the facility once the construction phase has finished. It is accepted by officers that a
proposals of this scale and complexity cannot be built without some temporary adverse
impacts as is often the case with construction activities. However it is important to ensure that
construction activity impacts are controlled in an appropriate manner to minimise any impacts
on surrounding sensitive receptors 
A construction Environmental Management Plan will be finalised and submitted to ensure
best practice during construction and in addition The Council’s Environmental Protection
Officer has recommended the following conditions be placed on any consent. 
Noise and Vibration 
The noise and vibration survey identified 15 Noise and Vibration Sensitive Receptors. The
sensitivity of 11 of the 15 identified receptors has been classed as high, 10 of which are
residential sites. 
The Environmental Impact Assessment Report Volume 1 – Main Report May 2022 states that
‘surface work is expected to take place Monday – Saturday 7am -7pm and Sundays 7am –
12pm with underground works expected to take place 24 hours a day’ 
With the number of noise and vibration sensitive receptors in the vicinity of the site, I would
suggest the following condition: 
“Surface work and underground work should be restricted to:  
• Monday to Friday: 0700 hours until 1900 hours. 
• Saturday: 0700 hours until 1700 hours. 
• Sunday / Public holidays: – no works, except for servicing and maintenance of plant
and equipment and emergency work. 
Reason: In order to protect the amenities of the area from noise and vibration nuisance
and to minimise local community annoyance” 
It is understood that a project of this magnitude may require some construction activities to
be take place outside of these hours. Environmental Health will consider all applications for
construction activities outside of these hours and will remain flexible (without detriment to the
local residents) throughout the project. 
Private Water Supplies 
The Environmental Impact Assessment Report Volume 1 – Main Report May 2022 identified
‘17 private water supplies located within a 5km buffer of the Proposed Development. Multiple
properties are served by the supplies which are considered to be of very high sensitivity’ 
In order to protect the identified private water supplies and the residents reliant upon
these supplies; Environmental Health request that detailed information be provided on

Page 27

how these 17 private water supplies will be protected during the construction and
operation phases of the proposed development. 
Reason – in the interest of public health and to ensure adequate measures are in place
to protect the identified private water supplies 
Lighting 
Artificial lighting will be used during the construction phase of the proposed development.
Mitigation measures have been identified in the Draft Construction Environment Management
plan. Environmental Health would be satisfied as long as the mitigation measures identified
are implemented. 
Similar, mitigation measures should be identified and implemented for the operational phase
of the proposed development. 
Dust 
The Draft Construction Environment Management plan has identified activities associated
with the potential to generate dust. Specific control measures have been identified to ensure
the employment of best practical means to minimise the risk of adverse effects from
construction dust. 
Environmental Health would be satisfied as long as the specified control measures identified
are implemented. 
In terms of the design appearance of the new quayside shown in photomontages contained
at (Figure 11.8 (a-d)) from the opposite side of Loch Awe near Tervine and from open water
in the vicinity of the site, Officers consider that further details on the construction and
appearance of the quayside require to be provided to investigate whether a softer and more
natural appearance can be achieved than the somewhat stark and industrial finish indicated.
As this is intended to be a permanent structure (notwithstanding that it is accepted that at this
point the visitor centre and other engineered and man-made features can be found) it is
important that best design and construction practice are used to minimise visual impact and
maximise the opportunity to provide a more natural appearance from open water in particular
as this is a popular location for water based recreational activities. 
It is therefore proposed that a condition requiring further details of the design /appearance of
the quayside feature and buildings be imposed to ensure that visual impacts are minimised,
and biodiversity opportunities through soft engineering solutions are maximised in design and
construction detail of this feature is required. 
Officers also consider that although the main construction compound will be temporary this
will still be large and potentially prominent in the landscape and in a localised context and it
is essential that the compound minimises impact and integrates, in so far as is possible, into
the landscape and also that restoration after use of the land also seeks to take on board the
requirements of NPF 4 in respect of seeking biodiversity improvements. A condition to secure
these objectives is also proposed
In respect of potential noise impacts Environmental protection officers have evaluated the
potential amenity impacts from the proposals and are content that subject to the imposition of
appropriate conditions these matters can be mitigated for the duration of the construction
period. The long term operation of the facility is not considered to raise any amenity issues for
residents.
Having due regard to the above subject to the recommended conditions being applied
in the event that consent is granted by the ECU it is concluded that the proposal will

Page 28

not have any adverse impacts on communities and individual dwellings, including,
residential amenity, noise and subject to the recommended conditions is consistent
with the provisions of SG 2 Renewable Energy; LDP STRAT 1 – Sustainable
Development; LDP DM1 – Development within the Development Management Zone;
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment; LDP 6 - Supporting the Sustainable Growth of Renewables; LDP 9 –
Development Setting, Layout and Design and SPP (2014); 
F. LANDSCAPE AND VISUAL IMPACTS, INCLUDING EFFECTS ON WILD LAND
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
landscape and visual impacts including wild land.   
In respect of these matters Volume 1 Chapter 11 of the main EIA report sets out in detail the
evaluation of the proposals by the applicant. This chapter and its conclusions are supported
by the following figures and appendices: 
 Technical Appendix 11.1: Figures including: 
 Figure 11.1: Zone of Theoretical Visibility; 
 Figure 11.2: Designated and Protected Landscapes; 
 Figure 11.3: Landscape Character; 
 Figure 11.4: Visual Receptors; 
 Figure 11.5: Indicative Landscape Mitigation Proposals; 
 Figure 11.6: Developments included in the Cumulative Assessment; 
 Figure 11.7 (a-d): Visualisation of Proposed Upper Intake Structure from Cruachan
Reservoir Track; 
 Figure 11.8 (a-d): Visualisation of Proposed Quayside Structure from above Tervine;
and 
 Technical Appendix 11.2: Visual Receptor Assessment. 
Policy SG LDP ENV 14 in respect of Landscape and Policy LDP3 of the adopted Argyll and
Bute Local Development Plan 2015 comprise the principal policies of relevance to landscape
and visual evaluation of the Proposed Development. The aim of this policy is to protect,
conserve and where possible enhance the built, human, and natural environment. Policy LDP3
also notes that a development proposal would not be supported where adverse effects,
including cumulative effects on the integrity or special qualities of international or nationally
designated sites; or, significant adverse effects, on the special qualities or integrity of locally
designated natural and built environment sites, would occur. 
In addition, Policy LDP9 concerns the design and setting of development, requiring
development to be sited and positioned to pay regard to the context, and be compatible with
the surroundings, particularly within sensitive locations including National Scenic Areas, Areas
of Panoramic Quality or Gardens and Designed Landscapes. 
 Woodland, green networks and wild land; 
 The established character and local distinctiveness of the landscape; and 
 The established character of the built environment in terms of its location, scale, form,
and design. 
Policy LDP3 is supported by various Supplementary Guidance with more specific regard to
other landscape and visual considerations including:

Page 29

 SG LDP ENV 6 Development Impact on Trees / Woodland; 
 SG LDP ENV 9 Development Impact on Areas of Wild Land; 
 SG LDP ENV 12 Development Impact on National Scenic Areas (NSAs); 
 SG LDP ENV 13 Development Impact on Areas of Panoramic Quality (APQs); 
 SG LDP ENV 14 Landscape; and 
 SG LDP ENV 15 Development Impact on Historic Gardens and Designed Landscapes. 
The following designated landscape areas and other areas protected through planning policy
fall within the study area, as shown on Figure 11.2 of Appendix 11.1 of the EIA. 
National Designations 
 Wild Land Area (WLA) 09. Loch Etive Mountains; and
 Ardanaiseig House Inventory Garden and Designed Landscape (GDL). 
Regional Designations 
 North Argyll Area of Panoramic Quality (APQ). 
Members are requested to note that LDP2 changes the name of Areas of Panoramic Quality
(APQs) identified in the Argyll and Bute Local Development Plan (2015) to Local Landscape
Areas. However, there is no change to the boundary of the North Argyll APQ which covers the
LVIA study area defined in the application documents. 
The applicants have provided separate Zone of Theoretical Visibility information  (ZTVs) for
the proposed Development indicating theoretical visibility of the upper intake structure and
quayside and are shown on Figures 11.1.The  ZTVs have been produced using the following
assumed heights of features: 
 Upper intake – Gate hoist structure at 13m above proposed ground level; and 
 Quayside – Three operational buildings at 4.5m above proposed ground level. 
The Proposed Development would be located on the northern shoreline and upper hills to
the north of Loch Awe. Loch Awe is a long, linear Loch with a south-west / north-east
orientation, but with an additional arm reaching westwards at its northern end towards the
Pass of Brander where the existing Cruachan 1 is located. 
The high craggy summits of Ben Cruachan and surrounding mountains rise steeply above
this part of the loch shore and dominate the surrounding area whilst elsewhere, smaller
scale landscapes of woodland, farmland and settlement characterise the loch-shore and
surrounding straths, backed by a rugged landscape with a broad-scale pattern of moorland
and commercial forestry. 
The existing Cruachan concrete buttress Dam forms a striking feature within the mountain
setting to the north of the Pass of Brander, and can be seen from many areas within the
wider landscape context. Features of Cruachan 1 are also present on the shore of Loch Awe
at the Pass of Brander, but are relatively discrete, being set within trees. 
In respect of landscape visibility and potential impacts visibility the applicants submit that:

Page 30

11.6.16 Theoretical visibility of the proposed quayside is shown to be relatively localised
within and around the arm of Loch Awe leading to the Pass of Brander. At the mouth of
this arm of the loch, potential visibility is also shown to be funnelled across Loch Awe
towards the south-eastern shore around Inistrynach, Bovuy and Achlian, and across
the upland moorland and forestry area to the south-east up to around 7.5 km from the
proposed quayside. 
11.6.17 Theoretical visibility of the proposed upper intake structure is shown to be
largely contained within Coire Cruachan by the ridges and summits of the mountains
that surround it. More distant potential visibility is shown across areas to the south of
this with patchy areas of ZTV coverage around areas such as Ardanaiseig and Hayfield
to the north of the main body of Loch Awe, and more consistent coverage across the
loch and the southern shore across areas around Ardbrecknish and Keppochan as well
as the hills beyond. 
11.6.18 Site survey to verify the ZTV suggests that in most cases, woodland and local
landform would limit actual visibility of these structures within the areas indicated,
particularly around Loch Awe, and the existing Cruachan Dam would reduce visibility of
the proposed upper intake structure from the south. The most consistent areas of
intervisibility with the Proposed Development would therefore be likely to be within
areas where woodland is limited, including views across the open waters of the loch,
typically featuring the proposed quayside, and within the upland and mountainous
areas, particularly around Coire Cruachan above the existing dam, where the proposed
upper intake structure would be located. 
The EIAR confirms that evaluation of potential impacts have been undertaken from public
transport routes and recreational routes. Residential Receptor Locations (RRLs) are described
in detail in Technical Appendix 11.2 and their locations are shown on Figure 11.4. 
The EIAR states that Landscape and visual issues have been a consideration throughout the
design process for the proposed development and that the following embedded design
principles have been adhered to in order to reduce potential landscape and visual effects
where possible. 
 The location of the majority of the proposed development underground; 
 Considered positioning of permanent, above-ground features to minimise landscape
and visual effect and optimise the opportunity for additional mitigation measures; and 
 Minimising the permanent design footprint as far as is possible including the scale of
required rock cuttings and requirements for woodland removal, particularly woodland
included on the Inventory of Ancient and Long-established Woodland. 
The applicants also confirm that embedded mitigation measures would also include habitat
and landform reinstatement which would be integral to the restoration of areas disturbed
during construction. The reinstatement of areas disturbed during construction would be
fundamental to ensuring that the proposed development would be successfully
accommodated into the existing landscape. This would be achieved through a combination of
natural regeneration in sensitive upland habitat areas (refer to Appendix 3.1: Construction
Environmental Management Plan), seeding where required and planting of appropriate
woodland species to promote biodiversity as well and landscape integration. 
Around the main permanent structures at the upper and lower control works, native woodland

Page 31

planting is proposed to help soften the appearance of new features and compensate for trees
and woodland lost through construction activities. The applicants contend that: 
 At the upper intake: Softening of the appearance of the rock cut areas though
mounding of stored top soils / peat at the base of the cut and planting of upland
woodland species (e.g. birch, rowan and willows), supplemented by the
encouragement of natural vegetation growth at the base of the cutting and on benches;
and 
 At the quayside: Softening of the appearance of the new quayside walls with strategic
replacement of stored soils on the quayside and planting with native woodland and
scrub species reflective of those within the nearby Coille Leitre SSSI. The locations of
such areas would be dependent on the operational requirements of the quayside 
 During operation, no changes would be likely to be perceived relating to the upper
works within the mountainous context. Therefore, potential change would be limited to
the permanent quayside and other associated features such as buildings and tunnel
portal. This would continue to form a perceptible change within this localised part of
the landscape as it would result in a new section or artificial shoreline and built
development in this area. However, this would occur within an area where the existing
Cruachan 1 power station, Tervine fish farm and the A85 already lead to some similar
features and the surrounding wooded character would reduce these changes to the
localised context. Woodland planting on the quayside area would help to reduce the
perceived level of change over time. 
Having examined the submissions in respect of such matters Officers are of the opinion that
the longer term operational landscape and amenity impacts of the proposals are acceptable
and accordance with Policy requirements subject to appropriate Landscaping, Biodiversity,
Habitat and Peat management plans being produced to progress the detail of such measures
Conditions on these matters are proposed. 
It is accepted by officers that the scale and magnitude of impacts will be far greater on a
temporary basis during construction than associated with the longer term operation of the
facility. However officers consider that the greater transitional landscape and visual impacts
during construction would not be a justification for raising objection to these proposals. 
Having due regard to the above subject to the recommended conditions it is considered
that the landscape and visual impacts (including cumulative) are acceptable and the
proposal is consistent with the provisions of: SG LDP ENV 13 – Development Impact
on Areas of Panoramic Quality; SG LDP ENV 14 –Landscape; SG 2 Renewable Energy;
LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables; LDP 9 – Development Setting, Layout and Design;  of the Argyll & Bute
Local Development Plan; SPP (2014); NPF 3 and Revised Draft NPF4 Policy 14 
G. EFFECTS ON NATURAL HERITAGE INCLUDING BIRDS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for wind turbine developments to be assessed against any
impact they may have on natural heritage including birds.

Page 32

The applicants have confirmed in Volume 1 Section 8 of the EIAR that in order to evaluate the
potential ecological sensitivities associated with the Site, a desk study was conducted in
advance of the field surveys. This included a review of: 
 Ecological and ornithological surveys undertaken within the Site boundary or its
environs since 2016; 
 Existing data on statutory designated sites available through NatureScot Sitelink
website for statutory designated sites up to 10 km from the Site; 
 Records of Ancient Woodlands available from NatureScot (up to 2 km from the Site); 
 The SBL; 
 Argyll and Bute Council has designated non-statutory nature conservation sites, and
such sites within 2 km from the Site were extracted from the Argyll and Bute Council
Local Development Plan; and
 Other pre-existing biological data relevant to the Site were also searched for in online
databases to which the authors had access and for which there were no copyright
issues associated with their use in a commercial setting. 
The EIAR conclusions have also been informed by a series of technical field studies, as
described in Technical Appendix 8.1. In summary, the surveys included: 
 Habitats, including GWDTEs and those listed as Annex 1 Priority Habitats, and notable
flora, including Invasive Non-Native Species (INNS);
 Otter;
 Water vole;
 Badger;
 Red squirrel;
 Pine marten;
 Bats;
 Vantage point surveys for target raptor species;
 Breeding birds;
 Black grouse;
 Electrofishing surveys for fish;
 Spawning habitat surveys (for salmonid fish);
 Kick and sweep surveys for macroinvertebrates, and
 Aquatic macrophytes. 
The potential impact on protected Woodland habitats associated with the Loch Etive Woods
SAC and SSSI was the reason for NatureScot and the Councils Biodiversity Officer to both
respond with a holding objection to the original EIAR submissions. Concerns over the potential
impact of widening the access track as part of the construction process have been successfully
addressed and by e-mail dated 25.10.22 the applicants clarified that: 
Further to our site visit last month and your request for further clarifications I am pleased
to attach the following for your information. 
1) Marked up technical drawings (as used on site visit) to show more clearly the existing
deer fence and SAC boundary, as these relate to the proposed widening works. We
agreed on site that, in practice, the SAC boundary would be aligned tightly to the southern
edge of the existing metalled road.
2) Provision of cross sections at key points, to show how widening and earthworks would
sit in the topography. On site we agreed that at this bend, where topography drops away
quite quickly, it would be useful for you to see how this encroachment into the SAC may

Page 33

look in profile. The previous commentary provided (see Q2 response in email trail below)
regarding the stabilisation technique still applies.
3) Updated SAC impact report, including updated habitat loss calculations, based on the
SAC boundary being aligned to the edge of the metalled road. As discussed on site, there
will be a small encroachment into two areas where there is existing tree (birch) cover. The
area of this encroachment has been calculated, in total along the whole length of the
works, at 210m2. The precise number of trees that could be lost as a result of the widening
works is not yet known. Once a contractor is on-board and we know their precise
construction methods and requirements we can be precise about what, if any, impact
there will be on existing trees. 
We trust that these clarifications will assist in your consideration and allow you to remove
your holding objection. 
The submission of the FEI at parts 5-7 and information enclosed therein on 14 December 22
has addressed these concerns and both holding objections have now been removed subject
to conditions ensuring more detailed submissions are made for approved to assist finalising
the design of the access track upgrades. RSPB are also satisfied with the proposals as set
out in their consultation response. 
In response to a request for additional clarification on felling and potential impact on woodland
by Scottish Forestry the applicants confirmed within FEI Part 8 that: 
For the avoidance of doubt, there is no proposed loss of woodland and therefore a
standalone woodland and forestry chapter has not been prepared as part of the EIA.
Effects and impact on trees have however been assessed in Chapter 8 Ecology, and
Chapter 11 Landscape and Visual Amenity. 
Impact on woodland has been considered in Chapter 8 Ecology. To inform that chapter,
a desk study was undertaken to anticipate potential ecological sensitivities associated
with the site. This included reviewing records of ancient woodland (up to 2km from the
site) and a review of statutory designated sites available through NatureScot Sitelink. That
review identified woodland habitats present along the access track corridor only and not
at either the lower works or the upper works. Table 8.9 summarises the likely construction
phase impacts and effects on the Loch Etive Woods SAC, Coille Leitire SSSI and Ancient
Woodland. Effects are from works to widen the dam access track, and for all works no
significant effects are predicted. 
A key premise of the proposed development is, where possible, the retention of existing
trees to help limit the visual appearance of construction works and proposed features,
particularly woodland included on the Inventory of Ancient and Long Established
Woodland. This is covered in Chapter 3 at paragraph 3.3.6. As detailed designs of the
proposals are developed more information about individual tree loss and planting as part
of any landscaping proposals will become available and we will be happy to share and
discuss these with you 
Scottish Forestry are content with the proposals and raise no objections as set out in their
consultation response. 
In respect t of the responses from Marine Scotland and the Council’s Marine Officer, they are
both content with the proposals and raise no objections. 
No objections have been raised by any of the external or internal consultees on ecological,
habitat or marine ecology matters subject to the imposition of appropriate conditions by the
Scottish Ministers.

Page 34

Having due regard to the above it is concluded that subject to the conditions
recommended by NatureScot, Marine Scotland, SEPA, Scottish Forestry and the
Council’s Local Biodiversity Officer and Marine Officer the proposal is acceptable in
terms of natural heritage, the marine environment and birds and is consistent with the
provisions of SG LDP ENV 1 – Development Impact on Habitats, Species and Our
Biodiversity (i.e. biological diversity); SG LDP ENV 7 – Water Quality and the
Environment; SG 2 Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP
DM1 – Development within the Development Management Zone; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; Policy LDP 6 –
Supporting the Sustainable Growth of Renewables of the Argyll & Bute Local
Development Plan; Government (January 2017); The Scottish Government’s Policy on
‘Control of Woodland Removal’ (Forestry Commission Scotland 2009); NPF 3 and
Revised Draft NPF4 Policies 3, 4 and 6 
H. IMPACTS ON CARBON RICH SOILS, USING THE CARBON CALCULATOR (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2 and SPP require applications for renewable energy developments to be assessed against
any impact they may have on carbon rich soils, using the carbon calculator. 
The EIAR, volume 1 at chapter 6 addresses these matters under a general heading of “ground
conditions”. SEPA have raised issues in respect of potential Peat impacts, mostly related to
the large construction compound area which is proposed to be located in an area with
identified peat (including deep peat). They have requested the ECU to place a condition on
any grant of consent requiring further information on the design and layout of the compound
and access tracks, with a specific requirement for a peat management plan to be submitted
and approved prior to works commencing. SEPA also wish not only restoration solutions to be
provided, but also opportunities through proposed management to improve the peatland in the
area. This after use of the construction compound is agreed to be an important matter which
requires to be both sensitively and effectively addressed in further submissions related to both
the operational phase of the compound and the restoration phase. 
Officers are in agreement with SEPA on the need for both a peat management plan to be
provided, but also for opportunities to improve the peatland/habitat in the general area of the
construction compound and other construction areas to be investigated. Conditions to this
effect have been requested by SEPA. 
Having due regard to the above, subject to the recommended conditions it is concluded
that the proposal will not have an adverse impact on carbon rich soils, using the carbon
calculator and is therefore consistent with the provisions of SG LDP ENV 1 –
Development Impact on Habitats, Species and Our Biodiversity (i.e. biological
diversity); SG LDP ENV 11 – Protection of Soil and Peat Resources; SG 2 Renewable
Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development within the
Development Management Zone; LDP 3 – Supporting the Protection, Conservation and
Enhancement of our Environment; Policy LDP 6 – Supporting the Sustainable Growth
of Renewables of the Argyll & Bute Local Development Plan; SPP (2014); NPF 3 and
Revised Draft NPF4 Policy 5 
I. PUBLIC ACCESS, INCLUDING IMPACT ON LONG DISTANCE WALKING AND CYCLING
ROUTES AND THOSE SCENIC ROUTES IDENTIFIED IN THE NPF (INCLUDING
CUMULATIVE IMPACTS)

Page 35

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on public access, including impact on long distance walking and cycling
routes and those scenic routes identified in the NPF. 
The Council’s access manager has provided a lengthy consultation response which raises no
objections to the proposals. However it is noted that an access plan has been requested and
it is agreed that this is necessary in order to ensure that access to local footpaths and visitor
facilities are not unnecessarily impacted. The EIAR submission confirms that access to the
Dam Structure and the road to it, which is widely used by visitors will remain open however
an access plan/strategy will gave the advantage at looking at the potential impacts on wider
access issues to ensure that there remain widespread opportunities for informal recreational
access to the hills and other popular locations. 
It is therefore considered that a wider access strategy is required to accompany the access
plan, and this should also explore potential improvements to footpaths in the area as a
community and tourism benefit associated with the proposals. Indeed some materials
extracted may potentially capable of re-use in the local area for footpath improvement. Officers
will explore these opportunities with the applicants should consent be granted as part of an
Access Plan and Strategy and a condition to this effect will be requested to be imposed. 
Having due regard to the above it is concluded that the proposal will not have  any
adverse physical impacts on public access, including impact on long distance walking
and cycling routes and those scenic routes identified in the NPF and is therefore
consistent with the provisions of SG 2 Renewable Energy, SG LDP TRAN 1 – Access to
the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 – Development
within the Development Management Zone; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan; SPP
(2014); NPF 3 and Revised Draft NPF4 Policy 21 
J. IMPACTS ON THE CULTURAL HERITAGE, INCLUDING SCHEDULED MONUMENTS,
LISTED BUILDINGS AND THEIR SETTINGS (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on the historic environment, including scheduled monuments, listed
buildings and their settings.   
In respect of the current proposals there are three main listed features which require to be
considered: 
 The Turbine Hall and associated infrastructure (Category A) 
The Turbine Hall is of high historic cultural significance for the role it played in the
technological development of hydroelectric power and the post-war energy programme
of Scotland. In 1965, when construction was completed, the asset was the first
example of a reversible turbine pumped storage plant in Britain. This development was
significant for British power generation as it improved energy efficiency; with the power
station being able to store otherwise wasted energy produced in off-peak hours to
instead be used when it was most needed. The construction of a power station of this
scale, underground, and utilising pumped storage was ‘pioneering’ and paved the way
for similar schemes elsewhere in the world. The hall was designed by James
Williamson and Partners and is noted in the listing as being ‘typical of their approach’

Page 36

which was defined as being innovative and forward thinking. Williamson and Partners
became synonymous with the North of Scotland Hydro Electric Board (NoSHEB) 
The receptor holds high architectural significance for its distinctive 1960s interior
design, featuring a timber mural by the artist Elizabeth Falconer. The turbine hall is
36m high by 90m long and features several design features dating from the 1960s,
including the timber mural, lighting and use of timber and concrete throughout. The
designation notes the following features specifically: • Viewing gallery to NE corner, •
Concrete lined vaulted roof, • Supported track and gantry cranes, • Tiled Floor • Timber
mural by Elizabeth Falconer, • Timber panels and acoustic baffling panels of concrete,
geometric shapes, • Projecting window to control room, • Large overhead lighting
panels 
 The Falls of Cruachan Railway Viaduct (Category A) 
As a Category A listed building, the viaduct, is a receptor of high sensitivity. The
significance of the receptor is derived from its architectural and historic interest, as a
result of its innovative form and its role in improving rail connections with Argyll. The
viaduct is the first on a British railway to have arches made from mass concrete, an
innovation which would greatly improve the ability of 19th century engineers to create
long stretches of viaducts. The viaduct forms part of the Callander and Oban Railway
which, constructed between 1866 and 1880, greatly improved connections into Argyll
and brought significant benefits to the previously isolated western region. 
The viaduct is also a fine example of 19th century rail infrastructure, described in the
designation as comprising of three concrete arches sitting upon bull-face stone piers.
The top of the viaduct has a crenelated parapet and a 21st century safety rail. There
is a string course along the base of the parapet and the central crenulation is raised
with a crest of arms. It forms a group with the nearby Cruachan Dam and Turbine Hall
as part of a series of large-scale interventions into the surrounding landscape setting. 
The viaduct is located to the north of the A85 and spans across a stream running down
the southern slopes of Ben Cruachan. The railway line sits within a small area of
wooded landscape at the foot of the mountain. The surrounding area makes a positive
contribution to the setting, with the surrounding natural scenery creating an attractive
backdrop. To the south of the asset is the A85, the potentially negative impact of the
road is largely mitigated by intervening vegetation, blocking views and noise even in
winter, and its position lower down the mountain. 
The proposals do not include any direct works that would affect the sensitivity or
significance of the Viaduct, as such any impact would arise through the introduction of
new built form within its setting. During the construction phase there would be
construction activity in and around the viaduct, including the temporary diversion of the
A85 to facilitate construction works. This Likely Significant Effects 2 diversion would
remain in place for 2-4 months during the construction of the initial section of the new
main access tunnel. Given that this would utilise an existing ‘lay-by’ feature within the
highway, it is not considered that this element of the proposals would result in any
permanent or longer term impact on the significance of this receptor. 
 The Cruachan Dam Structure (Category B) 
The immediate setting of the dam makes a positive contribution to its heritage
significance, creating a highly attractive natural setting, comprising of the reservoir
which feeds the power station below. The landscape surrounding the dam includes the

Page 37

mountains of Meall Cuanail to the west and Beinn a Bhuiridh to the east. The dam
appears as a manmade intervention within an otherwise scenic backdrop. The wider
setting of the asset is largely similar to its immediate setting; there is a lack of
development, and the area is largely natural. 
The dam sits within the Ben Cruachan mountain range. The peaks of the mountain
range create a horseshoe around the dam with the valley sloping southwards to Loch
Awe. The valley south of the asset contains some surface features associated with the
power station, such as a road and electrical substation. However, the smaller scale of
these features in the larger setting mean that it does not detract from the experience
of the asset. The weathered concrete exterior of the asset is complimented by the
exposed rock of the mountain, improving the ability for one to appreciate its
architectural form. 
The proposals include the creation of a new upper intake, to the south-east edge of
the reservoir, approximately 110m north of the dam. During construction, it is proposed
to construct the intake within a temporary dry well and the rock cutting will be
undertaken using a combination of blasting and rock support. This will then become a
permanent feature which must be considered in respect of its potential impact upon
the setting of the dam. 
The applicants in their FEI submissions of 14.12.22 clarify that: 
For detailed plans relating to the Section 36 application, please refer to the original
submission documents. Details of embedded mitigation are set out in detail within the EIAR
Cultural Heritage Chapter 12. In summary, these include: o Landscape design to the
proposed upper intake, o The preparation of a Construction Environmental Management
Plan (CEMP), a draft of which was included in the original EIAR. 
Following receipt of comments from HES and a site visit on 6 September 2022, further
detail has been provided in the following documents, enclosed at Appendix 5. • Cruachan
2 – Upper Intake and Dam Memorandum, Nov 2022 • Cruachan 2 – Access Tunnels
connecting Powerhouse and MAT Memorandum, Nov 2022 Likely Significant Effects
34289A5/P1/LK/ Page 13 December 2022 
A separate Listed Building Consent application is to be submitted for creation of the two
new access tunnels and the associated works that directly impact the listed Turbine Hall 
The proposed quayside would be a permanent change within the setting of the Category A
listed Turbine Hall, through the introduction of new structures within proximity of the main
access tunnel entrance. Once operational, the quayside would feature an administrative and
storage buildings which are required to facilitate ongoing operation and maintenance of the
expanded power station. Officers consider that conditions can be used to control the final
appearance of these buildings. 
The proposed quayside will be located below the existing embankment to Loch Awe, to the
east of the existing access tunnel. As a result of the topography and position of the quayside
and associated structures, these elements of the proposal will not result in any meaningful
change to the way in which the main entrance tunnel will be experienced within the landscape.
The applicants contend that; “This element of the proposal would give rise to a negligible
impact to the significance of the listed building.” Officers are in agreement with this view. 
Historic Environment Scotland (HES) (No response) 
No response has been placed on the ECU Website at time of writing this report,

Page 38

The Council’s Conservation and Heritage officer is content that the proposals are acceptable
subject to the use of appropriate conditions to provide more detail on the detailed design and
appearance of the proposed works associated with the new inlet structure in the vicinity of the
dam and set within a rock cutting. A condition requiring the submission of further details on
the appearance and materials to be used is proposed. 
Associated need for Listed Building Consent for works to Category A Listed Plant room
connections 
Members are requested to note that in addition to the applicant requiring S36 consent for the
creation of the new Turbine Hall, plant and associated tunnels and, a separate detailed Listed
Building Consent (which will be determined by the Planning Authority) is required to undertake
any works which could potentially adversely impact on the Category A listed Plant Room. 
Extensive discussions have been undertaken between Council Officers, HES and the
applicants to form agreement on the extent of the existing plant and machinery which forms
part of the listing potentially impacted by the proposals, and how the proposals can be
undertaken in a manner which respects the sensitivities of the existing listed plant room and
associated structures. 
These discussions have been running in tandem with the S36 process and Officers and HES
are content that the Listed Building Consent process can adequately safeguard the integrity
and character of the category A Listed Turbine Hall through this separate consenting regime. 
In respect of the S36 proposal and the need to safeguard the setting of the Category B Listed
Dam itself and the Category A Listed Falls of Cruachan Railway Duct, the Councils Heritage
advisor is content that  the use of conditions requiring the submission of further details to be
can properly address these matters. 
Having due regard to the above it is concluded that subject to the imposition of
appropriate conditions this proposal is consistent with the provisions of SG LDP ENV
16(a) – Development Impact on Listed Buildings; LDP 3 – Supporting the Protection,
Conservation and Enhancement of our Environment; Policy LDP 6 – Supporting the
Sustainable Growth of Renewables; and SG 2 Renewable Energy of the Argyll & Bute
Local Development Plan, NPF 3, Revised Draft NPF4 Policy 7 and Historic Environment
Policy for Scotland (April 2019) in this respect. 
K. IMPACTS ON ROAD TRAFFIC AND ADJACENT TRUNK ROADS (INCLUDING
CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on road traffic and adjacent trunk roads.   
Transport Scotland have the main responsibility for the adequate maintenance and proper
functioning of the Trunk Road network in Argyll and Bute. The A85 is critical for not only
residents and businesses going about their daily lives but also for tourism and associated
socio economic well-being of the whole community served by the A85 as a main arterial route.
As this is clearly an important matter, Officers have provided the Transport Scotland Response
in some considerable detail within the report for ease of reference.

Page 39

Members are requested to note that the Area Roads Manager has reviewed the response
from TS and the proposed conditions, and has raised no objection to the proposals or the
proposed conditions. 
Transport Scotland (TS) – have considered both the original EIAR and the FEI and advise that
they have no objection to the proposal subject to conditions to the conditions, set out below
and imposed on any grant of consent. Given the potential importance of roads as a planning
consideration comprehensive extracts of their consultation response have been set out below
for Members ease of reference: 
Temporary Traffic Management on A85(T) 
The EIAR states that construction of the main access tunnel portal will require temporary traffic
management on the A85(T). It was initially proposed to redirect the A85(T) using a temporary
build out on the loch foreshore, however, further information has been submitted to justify
discounting this approach due to the additional material and construction timescale required
to form this option. We note that it is now proposed to utilise the existing informal layby on the
A85(T) which is currently used as parking for the Falls of Cruachan railway station as well as
for hill walkers, to form a temporary realignment to the north of the existing A85(T), generally
as illustrated on Stantec Drawing 331201086/001/C/0862. We also note that at a width of
4.7m, the use of this layby will result in the need for one-way signalised shuttle workings,
lasting for approximately 3-4 months. Transport Scotland has indicated a desire for two-way
operation to be retained at this location during the construction period and discussions
continue on what might be possible at this location and the applicant is currently considering
alternative options. The applicant has also indicated that whilst traffic management is in place
on the A85(T), replacement public parking and access will be provided within the existing
Visitor Centre car park. The details of this and the provision of appropriate pedestrian linkages
along and across the A85(T) will require to be agreed. With regard to the current application,
Transport Scotland is content that this aspect is covered by a Planning Condition and that the
details of the temporary diversions and construction methodology affecting the A85(T) will be
dealt with post-consent(should planning consent be awarded). 
Development Access 
It is proposed to construct a new junction on the A85(T) at the eastern extents of the site to
provide access to the development area, in addition to the existing junction. This is illustrated
on Stantec Drawing 331201086/001/C/0859/P02. Transport Scotland has reviewed
preliminary design drawings for this junction and is content that the design of the junction can
be covered by a Planning Condition at this stage. 
Assessment of Environmental Impacts 
Chapter 9 of the EIAR presents the assessment of the likely significant transport effects arising
from the construction and operation of the proposed development. We also note that a
separate Transport Assessment (TA) has been prepared and is included at Appendix 9.1. The
EIAR states that the assessment has been undertaken in accordance with the Institute of
Environmental Management and Assessment (IEMA) Guidelines for the Assessment of Road
Traffic, Transport Assessment Guidance (2012), as well as the Design Manual for Roads and
Bridges (DMRB). Transport Scotland is satisfied with this approach. 
Study Area 
Chapter 9 states that in accordance with Transport Scotland’s scoping response, the A82(T)
and A85(T) have both been included within the study area. Baseline traffic flows have been

Page 40

determined using automatic traffic count (ATC) data for 2019 from Transport Scotland’s
National Traffic Data System (NTDS) platform and ATC surveys undertaken in 2017. The 2017
data has been uplifted to 2019 data based on a factor derived by comparing the 2017
Transport Scotland NTDS traffic counts to 2019 Transport Scotland NTDS traffic counts. We
also note that in order to establish the AM and PM hour flows, the busiest hour between 06:00
-12:00 was taken as the AM peak hour and the busiest hour between 12:00 -18:00 was taken
as the PM peak hour for each traffic count location separately. As such, the AM and PM peak
hours used in the assessment are not uniform across all the traffic count locations and instead
relate to the highest hourly AM and PM traffic flows for each location separately. Transport
Scotland considers this approach to be acceptable…. 
… While we would acknowledge that the high percentage increase associated with HGV traffic
is a factor of relatively low base flows, Transport Scotland would consider that some form of
mitigation is appropriate. We note that the conclusion of the assessment is that the
construction phase of would result in a “Negligible” magnitude of impact and hence a
“Negligible” significance of effect, with no further mitigation proposed other than the embedded
mitigation as detailed within Section 9.7 of the EIAR. Transport Scotland does not see how
this conclusion can be reached without considering the specific HGV effects. Section 9.7
indicates the proposed embedded mitigation as being a review of the works programme to
seek to reduce effects on sensitive receptors where reasonably practicable and the
preparation and implementation of a Construction Traffic Management Plan (CTMP). It is
noted that Transport Scotland would have looked for a CTMP to mitigate any environmental
effects associated with increased HGV levels, so we are satisfied that appropriate mitigation
can be put in place. A CTMP will therefore be required which should be submitted to, and
agreed by, the Area Manager prior to the commencement of any works. A key aspect of the
construction management will be the inclusion of a programme of before / during / after road
condition surveys and the scope of these will require to be agreed with Transport Scotland.
The applicant will be required to enter a Legal Agreement under Section 96 of the Roads
Scotland Act 1984 (Extraordinary Damage to Road), whereby the applicant agrees to pay the
costs of such damage attributed to their works. The adoption of this strategy is intended to
ensure impacts on the structural integrity of the trunk road network are managed. 
Road Safety Audit 
We note that an independent Stage 1 Road Safety Audit (RSA) was undertaken for the
Widening of St Conan’s Road, the main access road to the Lower Control Works site and the
secondary access road to the Lower Control Works site. We note, however, that the
installation of the signals and the shuttle working has not been subject to any RSA at this
stage. Transport Scotland will require a Road Safety Audit to be undertaken for these works
and submitted to the Area Manager. This will require to be undertaken as part of the detailed
design process for the traffic management arrangements 
Abnormal Loads Assessment 
An Abnormal Indivisible Loads Assessment (AILA) has been provided within the TA. This
states that it is a preliminary assessment and that detailed AIL access route assessments will
be undertaken for each required AIL at the time of the programmed movement dates, once
the specification / dimensions of those loads are known. We note that the Port of Entry for
components has yet to be finalised, and as such, the AIL route has yet to be finalised. Potential
ports and associated routes have been identified, however, as the A85(T) and A82(T) connect
directly to the site from the east and the west, constraints on these two sections have been
identified within the AILA based upon a preliminary desktop study. This assessment has
identified numerous height, width and weight restrictions on the A85(T) and A82(T) between
Oban and Crianlarich, all of which could require further investigation and potential mitigation.
We note that the AILA states that a transformer of a similar dimension and weight to the one

Page 41

assumed in the assessment was successfully transported to Cruachan Power Station from
Longannet Power Station in Fife. This AIL was transported during the night via the M876, M9,
A84(T), A85(T), A82(T) and A85(T). This required police escort, road closures on the A82(T)
between Crianlarich and Tyndrum and the temporary reinforcement of a bridge at Inverherive.
We understand that similar measures may be required during the delivery of AILs for the
current application and these would be assessed as part of future detailed AIL assessments.
Having discussed this issue with the applicant, Transport Scotland is content that the issue of
transporting AILs can be covered by appropriate Planning Conditions. 
Conclusions 
Based on the review undertaken and further to the various discussions with the applicant, we
can confirm that Transport Scotland is satisfied with the submitted EIAR and does not propose
to object to this planning application, on the understanding that the Conditions identified below
are attached to any consent granted. 
Condition 1: Prior to the commencement of any works, written approval from the planning
authority in consultation with Transport Scotland, must be obtained for the details of the
proposed means of access from the A85(T), generally in accordance with Stantec Drawing
Number 331201086/001/C/0859. Thereafter, the proposed access shall be constructed in
accordance with the approved details. 
Reason: To minimise interference with the safety and free flow of the traffic on the trunk road. 
Condition 2: Prior to the commencement of any works, a plan for the design, implementation
and duration of all temporary traffic management arrangements on the A85(T) must be
submitted to and agreed by the planning authority in consultation with Transport Scotland.
Thereafter, all temporary traffic management arrangements will be implemented in
accordance with the agreed plans. 
Reason: To minimise interference with the safety and free flow of the traffic on the trunk road. 
Condition 3: Prior to the commencement of any works, a detailed design and specification for
the proposed access portal structure beneath the A85(T) shall be submitted to and approved
in writing by the planning authority in consultation with Transport Scotland. Thereafter, the
proposed structure shall be constructed in accordance with the agreed plans. For the
avoidance of doubt preconstruction compliance will include, but not be restricted to: 
(i) Approval in Principle 
(ii) (ii) Category 3 structural design check to CG300 
(iii) (iii) Geotechnical Check - Category B to SH4 
Reason: To ensure that the proposed design of the works complies with the current standards
and that the safety and free flow of traffic on the trunk road is not diminished. 
Condition 4: Prior to the commencement of any works, a detailed design and specification for
any proposed sheet piling works adjacent to the A85(T) shall be submitted to and approved in
writing by the planning authority in consultation with Transport Scotland. Thereafter, the
proposed structure shall be constructed in accordance with the agreed plans. For the
avoidance of doubt pre - construction compliance will include, but not be restricted to: (i)
Approval in Principle (ii) Category 3 structural design check to CG300 (iii) Geotechnical Check
- Category B to SH4 
Reason: To ensure that the proposed design of the works complies with the current standards,
and that the safety and free flow of traffic on the trunk road is not diminished.

Page 42

Condition 5: Prior to the commencement of any works, a Construction Traffic Management
Plan must be submitted to and approved by Transport Scotland. The complete report shall
include, but not be restricted to, details of the following: 
o Identification of designated construction vehicle routes to site
o Access arrangements o Methods to ensure that construction routes are followed 
o Identification of construction vehicle volumes set against key construction tasks and
programme 
o Measures to minimise and control construction vehicle volumes
o Measures such as wheel washing and dust suppression requirements 
o Construction staff travel arrangements 
o Confirmation of site working hours 
o Measures for mitigating HGV movements through settlements lying within the A85 and A82
trunk road corridors 
o Measures for accommodating displaced car parking from the A85(T) during construction. 
o Measures for maintaining pedestrian access along and across the A85(T) during
construction. 
o Arrangements for monitoring accelerated wear and tear on the road network
o A blasting plan is to be included as part of CTMP 
o Arrangements for abnormal loads o Signage details and details of any temporary traffic
management arrangements o Site liaison details 
o Arrangements for monitoring and updating the CTMP 
Reason: To minimise interference and maintain the safety and free flow of traffic on the Trunk
Road as a result of the traffic moving to and from the development 
Condition 6: Prior to commencement of works on site, a methodology and programme shall
be submitted to and agreed with the planning authority in consultation with Transport Scotland,
relating to the monitoring of the condition of the A85 trunk road. Thereafter the approved
programme of monitoring shall be implemented. Any remedial works shown by the monitoring
as arising from the construction of the development, shall be undertaken by the applicant
within 3 months of the completion of the final monitoring undertaken, unless an alternative
means of securing the works is approved in writing by the Planning Authority in consultation
with Transport Scotland. 
Reason: To ensure the fabric of the trunk road is not adversely affected by the construction
operations 
Condition 7: Prior to commencement of deliveries to site, the proposed route for any abnormal
loads on the trunk road network must be approved by the trunk roads authority prior to the
movement of any abnormal load. Any accommodation measures required, including the
removal of street furniture, junction widening and any traffic management, must similarly be
approved. 
Reason: To minimise interference and maintain the safety and free flow of traffic on the Trunk
Road as a result of the traffic moving to and from the development. 
Condition 8: During the delivery period of construction materials / plant etc., any additional
signing or temporary traffic control measures deemed necessary due to the size or length of
any loads being delivered or removed must be undertaken by a recognised QA traffic
management consultant, to be approved by Transport Scotland before delivery commences. 
Reason: To ensure that the transportation will not have any detrimental effect on the road and
structures along the route.

Page 43

Transport Scotland has not included any Conditions relating to works associated with, or in
close proximity to, the railway line or the various approvals and consents which will need to
be obtained from Network Rail regarding these. Transport Scotland is willing to liaise and
consult with Network Rail as required but would fully expect and anticipate Drax to do the
same. 
In addition to the above Conditions the applicant should also be informed of the following
advisory notes setting out requirements relating to works within the trunk road boundary. 
i. The applicant should be informed that the granting of planning consent does not
carry with it the right to carry out works within the trunk round boundary and that
permission must be granted by Transport Scotland Roads Directorate. 
ii. Trunk road modification works shall, in all respects, comply with the Design Manual
for Roads and Bridges and the Specification for Highway Works published by
HMSO. The developer shall issue a certificate to that effect, signed by the design
organisation.
iii. Trunk road modifications shall, in all respects, be designed and constructed to
arrangements that comply with the Disability Discrimination Act: Good Practice
Guide for Roads published by Transport Scotland. The developer shall provide
written confirmation of this, signed by the design organisation.
iv. The road works which are required due to the above Conditions will require a Road
Safety Audit as specified by the Design Manual for Roads and Bridges.
v. Any trunk road works will necessitate a Minute of Agreement with the Trunk Roads
Authority prior to commencement.
vi. To obtain permission to work within the trunk road boundary the developer should
contact the Area Manager through the general contact number 0141 272 7100.
vii.  The Operating Company has responsibility for co-ordination and supervision of
works and after permission has been granted it is the developer's contractor's
responsibility to liaise with the Operating Company during the construction period
to ensure all necessary permissions are obtained. 
The Council’s Roads & Amenity Services 
The Area Roads Manager has reviewed the above response by TS and both the original EIAR
and the FEI.  He advises that the site access connects directly to the A85 and that the advice
of Transport Scotland should be sought by the ECU on the formation of this junction.  The
area Roads Manager has commented that: 
Trunk Roads to comment on A85 issues. 
It is noted that the Trunk Road network will probably be impacted more than the local area
network. If the local area roads network is to be affected by disposal of excavated materials
for any reason then commensurate improvements may be required to facilitate significant
additional vehicle movements at the developer’s expense. 
The following conditional matters have been requested to be imposed by the Area Roads
Manager. 
 Information to be provided on locations for disposal of material from works, specifically
the impact on local area roads and infrastructure. Construction Traffic Management
Plan to be provided if necessary. 
 Traffic Impact Analysis required to cover any potential impact on Argyll and Bute
Council local area roads. This report should include a cumulative report in concert with
other S36 and S37 schemes in the North Argyll/ Loch Awe area paying particular
attention to the possibility of utilizing materials locally to prevent unnecessary vehicle

Page 44

movements thus reducing the potential for related deterioration of the fragile local area
roads network. 
Discussions have been undertaken with the applicant about seeking to minimise the
transportation of extracted rock material on the road network as part of minimising both HGV
traffic on the wider road network, but also reducing emissions associated with this. 
It has been agreed in discussions between the applicant and the Area Roads Manger that the
requested Cumulative TIA which both Transport Scotland and The Area Roads Manager will
require to approve should be conditioned, but also that as part of the CEMP a “waste”
management plan and strategy should be provided to clarify how the applicants have sought
to maximise local use of the extracted materials rather than transport it to more distant
locations using the roads network. At the moment Officers have been informed that the
use/destination of all materials has not been finalised and Officers consider that this is a matter
which would benefit from further discussions between the applicants. A&B Council and
Transport Scotland and the suggested condition will seek to achieve this approach. 
Having due regard to the above, subject to the relevant conditions being attached to
any consent granted by the ECU, it is concluded that the proposal  will not have any
adverse impacts on road traffic and adjacent trunk roads and the proposal is consistent
with the provisions of SG2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables; SG LDP TRAN 4 – New and Existing, Public Roads
and Private Access Regimes of the Argyll & Bute Local Development Plan , NPF 3 and
Revised Draft NPF4 Policy 12 
L. EFFECTS ON HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK
(INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against effects on hydrology, the water environment and flood risk.   
In their initial consultation response SEPA raised a number of concerns/questions in respect
of drainage/flooding and other technical matters which they required further clarification on,
as set out below: 
We have reviewed the information supplied with the EIAR and have found it to be insufficient
to allow us to determine the potential impacts. We therefore submit a holding objection and
request determination be deferred until further information is provided in relation to
hydrogeological / groundwater issues, site ecology and flood risk as detailed in Sections 1, 4
and 5 below. We will review our position if these issues are adequately addressed. 
We support the intention produce a Site Waste Management Plan (SWMP) and that this is to
remain a live document throughout the duration of the construction period. We request a
planning condition requiring the preparation of a full SWMP once design and contracting
elements of the project are confirmed. We agree this should build on the information provided
in the EIAR and specifically, given the potential implications for its storage and the reuse
potential of the material, this will also need to be informed by the outcome of further
assessments required in relation to the potential for the geology at the site to generate acidic
leachates and acid rock drainage as discussed in Section 1 above and Appendix 2 enclosed. 
4.1 We have concerns regarding the impact to groundwater dependent flush habitats, in the
Lower Site Compound area and throughout Upper Works (particularly down the slopes leading
into Cruachan Reservoir and down to the existing Access Track). The mapping provided in
Figures 3.3 and 3.4 of EIAR Appendix 8.1 Non-Avian Ecology does not show the location of

Page 45

the flushes and the text has not made it clear how close the flushes are to excavation areas,
nor their relative position. The M10 and M11 base-rich flushes can be assumed to be
groundwater dependent, however the groundwater dependency of other potential GWDTE
habitats noted on site has not been assessed. 
We therefore request further information be provided to: a) Assess the likelihood of
groundwater dependency of the potential GWDTE habitats which will be directly or indirectly
impacted by the development. M10 and M11 flushes are assumed to be groundwater
dependent so do not need to be included in the assessment; and b) Illustrate the relative
position of the infrastructure and excavation areas in relation to the flushes, other groundwater
dependent wetlands and wetlands valuable for nature conservation (i.e. all levels of
importance above site level). The groundwater dependent wetlands should only be included
for those assessed as being likely to be groundwater dependent. 4.2 Given the reliance on
the Habitat Restoration and Landscape Mitigation Plan to address impacts to wetland habitats
and peat we request an outline plan is provided prior to determination for review. A planning
condition should also be applied to require the full plan to be submitted before
commencement. Damage to groundwater dependent flushes is often permanent; it is difficult
or impossible to reinstate or restore flushes after direct impact or redirection of groundwater
emergence; the HRLMP, CEMP and infrastructure layout must consider this and address the
likely outcome for these habitats, which are important for nature conservation. 4.3 Further
information must be provided on the layout of the Lower Site Compound and the requirement
to excavate at this location. The applicant should clarify if alternative locations for the Lower
Site Compound were considered, if excavation can be avoided where peat depth is greater
than 0.5 metre and if there are flushes in the Lower Site Compound area and how will these
be managed 
Therefore, a flood wall to a 1 in 100 SoP will not ensure the development will necessarily
remain operational during a 200-year event. FRA Appendix E indicates the precise SoP is
107-year event and anything greater will overtop the proposed wall. We therefore request the
design of the flood wall is modified to ensure it is designed and constructed to remain
operational during the 1 in 200 year flood even
During the construction phase of the project it is anticipated 2.3 million tonnes of excavated
rock arisings will be produced over the 5.5 year construction period (2024- mid 2029). EIAR
Section 3.8.2 indicates that the excavation arisings will be in the form of rock ‘chippings’
ranging from boulders to fines produced by drill and blast techniques. It is reported that drill
and blast methodology is assumed to be used for all underground works….0.45 million tonnes
of excavated material is to be reused on site. It is proposed that 140,800 tonnes of material
will be used towards the construction of a 510m long quayside structure on Loch Awe and
used in concrete production. The excavation arisings, 15,000 tonnes of spoil at any one time,
will be stored on the quayside structure, prior to transportation off-site by road. The arisings
will be stored under a canopy structure, enclosed on three sides to prevent runoff and
windblown silt from entering Loch Aweon for lining the tunnels. There is currently no agreed
use for the remaining excavated material. 
We also request, if you are minded to grant consent, the planning conditions detailed in
Sections 2.6 (Site Waste Management Plan), 4.2 (Habitat Restoration and Landscape
Mitigation Plan) and 4.8 (Peat Management Plan) be attached to the consent. 
(Additional information provided on these matters in FEI on 14.12.22) 
Although many of these matters have now been addressed by the EIAR/ FEI submissions and
further clarifications provided to SEPA by the applicants, there remains one outstanding matter
on which SEPA have maintained a holding objection to the proposals as set out below:

Page 46

Potentially Acid Generating (PAG) Rock Construction of the Cruachan Expansion
Project will require the removal and management of an estimated 2.3 million tonnes of rock.
The EIAR states it is likely some of the arisings will be Potentially Acid Generating (PAG)
rock. We previously requested more information to understand the potential for the site
geology to generate acidic leachates and acid rock drainage and to evaluate the
appropriateness of material reuse as fill materials and concrete aggregates. The findings
from the initial investigation in the submission are that some of the material is likely or highly
likely to be potentially acid generating which means the rock arisings could potentially leach
acidic leachate and mobile metals. This will heavily influence material storage, transport,
disposal and potential reuse options. 
While we agree with the applicant that an Acid Rock Drainage (ARD) Management Plan
will be required (and secured as a planning condition), there remains significant uncertainty
regarding the amount of material which will be potentially acid generating. No information
has been provided to estimate the scale of the issue. We therefore cannot currently advise
on the potential environmental effects associated with this element of the project. 
It is likely this material will have to be segregated and disposed of at an appropriate site
(i.e. landfilled) with mitigation to prevent environmental impacts and regulation by SEPA
under the Pollution Prevention and Control (Scotland) Regime (PPC). At this stage it is not
clear what size of site would be needed and whether a suitable one would be available to
accept the material. This represents a significant environmental risk which we expect to be
addressed before determination. 
On that basis we maintain our holding objection on grounds of lack of information in
relation to the potential impacts associated with the potentially acid generating rock. To
allow us to revisit this position we require further information to outline how much material
is potentially acid generating, what will be the disposal method for it, the environmental
risks involved and the contingencies should more material than anticipated be affected. 
The treatment of this material will be tied into the required waste management plan which
officers consider is required to sit outside the general CEMP as there are very specific and
detailed matters which require to be addressed. In the opinion of Officers this will be best
achieved through a separate document and not folded these matters into the larger CEMP
submissions. SEPA have already advised the ECU that a condition on these matters is
required. 
Officers verbally discussed this Objection with SEPA on 22.1.23 and they have clarified that
this is not an objection in principle to the development but a technical matter they require to
be satisfactorily addressed before withdrawing their objection. This will be a matter for the
ECU to resolve prior to reaching their conclusion on the proposal and is not considered a
matter which the Planning Authority should raise objection to. 
Having due regard to the above, subject to the relevant conditions being attached to
any consent granted by the ECU, it is concluded that the water environment and flood
risk have been considered and the proposal is consistent with the provisions of SG 2
Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of Renewables
and SG LDP SERV 7 – Flooding and Land Erosion – The Risk Framework for
Development of the Argyll & Bute Local Development Plan, SPP (2014), NPF 3 and
Revised Draft NPF4 Policy 1 
M. IMPACTS ON TOURISM AND RECREATION (INCLUDING CUMULATIVE IMPACTS)

Page 47

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against any
impact they may have on tourism and recreation. 
There is no record on the ECU website of any consultation advice from Visit Scotland on the
ECU website.  It is considered that it would be beneficial for the ECU to obtain their views prior
to reaching a decision on this proposal. 
The Council regards landscape as being a particularly valued asset both in terms of its intrinsic
qualities and in terms of its value to the tourism economy. For all types of development the
maintenance of landscape character is an important facet of decision-making in the
countryside in Argyll & Bute, regardless of the scale of development proposed. The Council’s
LDP Policy LDP 6 identifies impacts on tourism and recreation as a material consideration in
the assessment of renewable energy developments on the basis that inappropriate
developments with significant adverse effects which contribute to the degradation of
landscape character are unlikely to be in the interests of the Argyll tourism economy. 
Potential impacts on tourism are addressed within the EIAR at Volume 1 chapter 13.The EIAR
at 13.7.13 recognises that: 
Argyll and Bute is a popular tourist destination owing to its high quality natural environment,
heritage attractions and onward travel connections to the Western Isles and Inner Hebrides.
Tourism is a key sector and a growing industry in Argyll and Bute. In 2019, Argyll and the Isles
witnessed notable growth in overnight tourism. Both domestic and international visitors
increased in numbers which resulted in even bigger rises in nights and expenditure. Between
2017 and 2019, overnight trips to Argyll and the Isles were just under a million per year on
average, a 15% increase from 2016-2018-22. ..Argyll and Bute has the highest share of
tourism businesses when compared to any other area in Scotland. Tourism businesses make
up 13% of businesses in Argyll and Bute compared to a national average of 8%23. 
The EIAR also clarifies that; 
Within the Study Area, Drax’s Hollow Mountain visitor centre at the Cruachan pumped storage
hydro power station is a popular indoor tourist destination. The visitor centre attracts
approximately 50,000 visitors a year and in 2019 was ranked among the top 2% of Visit
Scotland’s quality assurance scheme with high scores for friendliness and hospitality. St
Conan’s Kirk in the village of Loch Awe is another indoor tourist destination in the Tourism and
Recreation Study Area. It is a Category A listed building and a landmark which attracts visitors
to the village of Loch Awe. It is accessed from the A85 and benefits from impressive views
towards Loch Awe. 
In respect of potential visual impacts it is not considered that the proposals will have a long
term significant adverse impact as the majority of the permanent works will be underground
or be subject to appropriate landscape mitigation measures. The new quayside and office
buildings will be retained, however as they are in the general local of the existing visitors centre 
and subject to appropriate scale/design and landscaping it is not considered that these will
have an unacceptable permanent impact on the landscape or on tourism. 
The Cruachan dam and ridge are important tourist attractions in themselves and Drax have
confirmed in their submissions in Volume 1 chapter 13 (Table 13.1) of the EIAR that access
to the Cruachan Dam and also the Cruachan Ridge will not be restricted. This is welcomed.
It should however be noted that; 
…it is considered that the indoor tourist destination of Cruachan Visitor Centre and tour of
the ‘Hollow Mountain’, could experience effects during the construction phase and therefore

Page 48

the potential impacts on indoor tourist destinations during construction have been
assessed” 
The Council’s Access Manager has requested that an access plan be produced for the
proposals to ensure clarity on access matters and a condition to this effect is therefore
recommended. The require CEMP will also require to demonstrate how parking will be
provided to access these features. The confirmation by the applicant that a more localised
Construction Traffic Management Plan will be provided either separately as part of the overall
CEMP, which will require to be approved by TS and the Area Roads Engineer, is welcomed. 
The evaluation of potential construction phase impacts upon indoor and outdoor tourism are
provided at Table 13.10 of the EIAR and conclude that all of the potential impacts are minor
and not of significance, with the exception of impacts upon visitor accommodation where it is
accepted that: 
In the absence of firm proposals for the accommodation of the construction workforce,
significant adverse effects could arise on the visitor accommodation sector. This would
result from accommodation being block booked for extended periods of time (high
magnitude of change) and therefore being unavailable to the tourism sector during the
construction period. This would be a major (significant) adverse effect. 
The impact on visitor accommodation is set in the context of it being a constituent part of
the tourism sector. If visitor accommodation is block booked, for up to 6 years in this
instance, it becomes unavailable to the tourism sector and the magnitude of change in
visitor attractiveness and tourism potential is therefore high as the benefits don’t accrue
to the other local businesses that serve the tourists staying in the hotels and guest houses.
These accommodation providers would no longer be serving the tourism sector, instead
they will play a role in serving the construction sector. 
Conversely, the use of visitor accommodation on an ad-hoc basis for visiting executives,
engineers and specialist advisors, would have a moderate beneficial effect, but this would
only accrue if the accommodation options are not exhausted by use for construction
workers. In the absence of firm proposals for construction worker accommodation this
effect will not be realised and therefore the potential effect remains major and adverse 
The EIAR confirms that there is a projected significant impact on visitor accommodation.
Officers also consider there will be potential impacts upon the operation of the general rented
housing market as well as workers seek to find accommodation displacing local families and
individuals and have requested that these matters be considered further by the Scottish
Ministers prior to any determination of the S36 application being made and a deemed planning
permission issued to ensure NPF 4 policies and objectives are fully considered. 
Having due regard to the above, in terms of the impacts on tourism and recreation the
proposal is considered to be consistent with the provisions of: SG LDP TRAN 1 –
Access to the Outdoors; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment;  Policy LDP 6 –
Supporting the Sustainable Growth of Renewables; SG LDP ENV 14 –Landscape; and
SG 2 Renewable Energy of the Argyll & Bute Local Development Plan, NPF 3 and
Revised Draft NPF4 Policy 25 
N. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-ECONOMIC
BENEFITS SUCH AS EMPLOYMENT, ASSOCIATED BUSINESS AND SUPPLY CHAIN
OPPORTUNITIES

Page 49

Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewables and
SPP require applications for renewable energy developments to be assessed against net
economic impact, including local and community socio-economic benefits such as
employment, associated business and supply chain opportunities. 
.  
Community Benefit is not considered to be a ‘material planning consideration’ in the
determination of planning applications for Energy Related Developments.  In the event that 
the Scottish Ministers permission were to be granted, the negotiation of any community
benefit, either directly with the local community or under the auspices of the Council, would
take place outside the application process between the Scottish Ministers, The Council and
the applicant. This is the established procedure for such discussions. 
The EIAR confirms that Based the capital cost estimate provided by the application in June
2021 the construction of the proposed development is expected to require a UK capital
expenditure of £450 million. This will give rise to employment and associated expenditure in
the economy (direct, indirect, and induced). Construction of the proposed development is
expected to extend across a 6-year programme of works to achieve operation of the first unit 
The construction of the Proposed Development is therefore estimated within the EIAR to
support a total 3567 gross Person Years of Employment (PYE) 31 over the 6-year construction
period across the study area. This equates to 357 Full Time Equivalent (FTE)’s over the 6-
year construction programme across the study area. 
The EIAR further states that 
Based on the additionality assumptions, the 3,567 gross temporary construction jobs
created by the Proposed Development are expected to support approximately 664 net
temporary construction jobs across the 6-year construction period within the Labour Market
Study Area. This represents 34.9% of existing construction jobs (664 jobs) within the study
area. 
The key sector likely to experience socio-economic effects from the Proposed Development
during the construction phase is the construction sector. The effects on the construction
sector have been reviewed and analysed in Section 13.11.3 to 13.11.9 above resulting in
a conclusion of Short-Term Major Beneficial effect. 
The operation of the Proposed Development would result in a Negligible Beneficial
magnitude of change on the Key Business Sector of Construction (High sensitivity receptor)
resulting in a Minor Permanent Beneficial effect. 
The EIAR confirms that there will be significant short term employments benefits, particularly
in the construction industry, however the long term benefits in respect of employment are
minor. This of course has to be viewed in the context that the benefits from workers moving
into the area , displaces the tourists who would otherwise take up some of this accommodation
which is not a benefit which is also recognised in the EIAR. The EIAR confirms; 
Drax have confirmed to Officers that they will be seeking to use local staff and materials where
they can and also that they are already engaging with other organisations to provide wider
benefits to Argyll and Bute. 
 Drax will organise Meet the Supplier days to match local companies with
opportunities during the construction phase. 
 Drax is the first UK energy company to announce an initiative to improve
employability for a million people by 2025. Through its ‘Mobilising a Million’ initiative,

Page 50

Drax will connect with one million people by 2025 to improve skills, education,
employability, and opportunity. The Proposed Development will provide opportunity
for Drax to provide more opportunities in Argyll and Bute. 
 Drax has a long running apprenticeship scheme which is part of its commitment to
developing new talent as well as upskilling the workforce across the communities
where it operates, including Argyll and Bute. The craft apprenticeship scheme,
which operates at Cruachan, gives new recruits to Drax the opportunity to gain skills
and expertise by working alongside highly qualified engineers. An expanded
Cruachan power station will allow Drax to continue and expand this scheme giving
apprentices a chance to development core skills and prepare for future careers.
These unique opportunities provided by Drax can boost economic development
across Argyll and Bute. 
The applicants submit that during the construction phase there will be opportunity for the
provision of work experience and apprenticeships and the applicant has already engaged with
local schools and colleges and Highland and Islands Enterprise with regard to training and
apprenticeship programmes to maximise local employment opportunities. This is welcomed
and in their additional NPF 4 related submissions on 20.1.23 they further clarify that: 
 NPF4 calls for national developments to be exemplars of a Community Wealth
Building (CWB) approach to economic development. CWB is defined as “A people-
centred approach to local economic development, which redirects wealth back into
the local economy, and places control and benefits into the hands of local people”. 
 Along with the direct employment opportunities Drax provides at Cruachan, they
also offer opportunities for STEM learning through educational tours of Cruachan
and Drax personnel visit local schools to talk to students about routes into STEM
careers and deliver hands on STEM learning workshops. Drax also offer work
experience opportunities for Oban High School students to gain experience in
engineering in the workplace environment. During Scottish Apprenticeship week
Drax offer workshops to schools and colleges focussing on application skills and
opportunities available for Drax apprenticeships across their operational assets.
The proposed expansion of Cruachan Power Station will allow Drax to continue and
expand these initiatives giving local young people a chance to develop core skills
and prepare for future careers. 
They further state that; 
The Cruachan Expansion project can boost economic development across Argyll and
Bute and will contribute to meeting key priorities not only of NPF4 but also the Argyll and
Bute Economic Strategy 2019-2023 by attracting inward investment, bringing additional
jobs and learning opportunities and improving linkages between skills providers and
employers in both the public and private sector 
These measures are welcomed and the Planning Authority considers that delivering on these
wider socio economic benefits are an important aspect of the successful delivery of the project.
However, as previously clarified, such matters have historically been addressed outside the
S36 Application process by the Council and Officers can identify no reason that this should
not continue to be the case for this application. 
Given the large scale of this project along with the extended duration of the
construction works, it is considered that there is the potential for the development to

Page 51

have adverse impacts on the local community caused be a greater demand and
competition for housing.  The Oban and Lorn housing market area is one of the more
pressured in Argyll and Bute with higher levels of demand for housing combined with
a higher proportion of the existing housing stock being in use a short term lets for
tourism.  Mitigation is therefore required to address this impact which otherwise would
result in the proposal being unacceptable.  It is therefore recommended that, should
the application be approved, a suspensive condition should be attached to the deemed
planning consent, requiring the submission of a strategy for housing incoming
construction workers.  It is considered that this condition would give the applicant
flexibility and allow for the consideration of a number of possible options including, but
not limited to the provision of additional permanent housing in the area, the use of
buildings which are currently vacant, the provision of temporary accommodation for
workers or bussing in workers from further afield. 
Having due regard to the above the proposals net economic impact, including local and
community socio-economic benefits such as employment, associated business and
supply chain opportunities has been assessed and it is concluded that the proposal is
consistent with the provisions of Supplementary Guidance 2 (December 2016); LDP
DM1 – Development within the Development Management Zones; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; NPF 3 and Revised Draft NPF4 Policies 11(c)
and 25 
O. THE SCALE OF CONTRIBUTION TO RENEWABLE ENERGY GENERATION TARGETS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against the
scale of contribution to renewable energy generation targets.   
The Scottish Government is committed to increasing the supply of renewable energy within
Scotland.  The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 sets
stringent targets for Scotland. The Act sets a legally-binding “net-zero” target of all greenhouse
gases by 2045. The “net-zero” target for Scotland is five years ahead of the date set for the
whole of the UK.   
The proposal would provide approximately 600MW of additional power Generation and
represents a significant and nationally important uplift in pump storage renewable energy
production. As referenced elsewhere in this report. The expansion of Cruachan is a specific
national priority contained within NPF3 and also revised draft NPF 4 which comes into force
as a statutory planning document on 13.2.23. 
Having due regard to the above the proposals scale of contribution to renewable energy
generation targets has been assessed and it is concluded that the proposal is
consistent with the provisions of SG 2; Supplementary LDP STRAT 1 – Sustainable
Development; LDP DM1 – Development within the Development Management Zone;
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment; LDP 6 - Supporting the Sustainable Growth of Renewables; SPP (2014);
NPF 3 and Revised Draft NPF4 Policies 1 and 11 
P. EFFECT ON GREENHOUSE GAS EMISSIONS 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, SG 2 Renewable Energy
and SPP require applications for renewable energy developments to be assessed against their
effect on greenhouse gas emissions.

Page 52

The proposal would generate renewable electricity and would therefore displace carbon
dioxide (CO2) emissions associated with electricity generation, which would otherwise be
supplied via other forms of power generation requiring the combustion of fossil fuels. 
Having due regard to the above the proposals effect on greenhouse gas emissions has
been assessed and it is concluded that the proposal is consistent with the provisions
of SG 2 Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting the
Protection, Conservation and Enhancement of our Environment; LDP 6 - Supporting
the Sustainable Growth of Renewables; SPP (2014); NPF3 and Revised Draft NPF 4
Policies 1 and 11. 
Q. THE NEED FOR CONDITIONS RELATING TO THE DECOMMISSIONING OF
DEVELOPMENTS, INCLUDING ANCILLARY INFRASTRUCTURE, AND SITE
RESTORATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for conditions relating to the decommissioning of developments,
including ancillary infrastructure, and site restoration.   
The Proposed Development will have a design life of circa 100 years, after which the need for
re-powering or decommissioning will be considered at that time. The Proposed Development
is therefore treated as permanent in the submitted EIAR, and repowering and
decommissioning are therefore not considered. 
On a project with this projected lifespan, where the substantive new build elements are
underground, and judged by officers not to be causing substantive harm in terms of landscape
or localised impacts, this is considered by officers to be a reasonable approach. 
Having due regard to the above it is concluded that the need for conditions relating to
the decommissioning of developments, including ancillary infrastructure, and site
restoration has been considered and the proposal is therefore consistent/inconsistent
with the provisions of SG 2 Renewable Energy, Policy LDP 6 – Supporting the
Sustainable Growth of Renewables of the Argyll & Bute Local Development Plan, SPP
(2014); NPF3 and Revised Draft NPF 4 Policy 12.   
R. OPPORTUNITIES FOR ENERGY STORAGE (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against any opportunities for energy storage which exist.   
The proposal is for pump hydro storage to store energy from the development or excess
electricity from the national grid by pumping up water and releasing it at time of high demand,
providing stability to the electricity supply network, meeting energy demands and providing
improved energy security.   
Having due regard to the above it is recommended that the Council should not object
to the proposal on the grounds of opportunities for energy storage (including
cumulative impacts) in accordance with the provisions of SG 2 Renewable Energy,

Page 53

Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP (2014); NPF3 and Revised Draft NPF4 Policies 1 and 11. 
S. THE NEED FOR A ROBUST PLANNING OBLIGATION TO ENSURE THAT OPERATORS
ACHIEVE SITE RESTORATION (INCLUDING CUMULATIVE IMPACTS) 
Policy LDP 6 – Supporting the Sustainable Growth of Renewables, Supplementary Guidance
2: Renewable Energy and SPP require applications for renewable energy developments to be
assessed against the need for a robust planning obligation to ensure that operators achieve
site restoration. 
The Proposed Development will have a design life of circa 100 years, after which the need for
re-powering or decommissioning will be considered at that time. The Proposed Development
is therefore treated as permanent in the submitted EIAR, and repowering and
decommissioning are therefore not proposed. On a project with this projected lifespan, where
the substantive new build elements are underground and judged not to be causing substantive
harm, this is considered by officers to be a reasonable approach. 
Having due regard to the above it is concluded that opportunities for a robust planning
obligation to ensure that operators achieve site restoration have been considered and
the proposal is therefore consistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll & Bute
Local Development Plan, SPP (2014); NPF3 and Revised Draft NPF 4 Policy 12. 
T. CLIMATE CHANGE (EMISSIONS REDUCTION TARGETS) (SCOTLAND) ACT 2019, and
THE SCOTTISH ENERGY STRATEGY 
The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 - The Scottish
Government is committed to increasing the supply of renewable energy within Scotland.  The
Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 sets out stringent targets
for Scotland. The primary objective of the Act is to raise the ambition of the greenhouse gas
emissions reduction targets set out in the Climate Change (Scotland) Act 2009. The Act sets
a legally-binding “net-zero” target of all greenhouse gases by 2045. The “net-zero” target for
Scotland is five years ahead of the date set for the whole of the UK.   
The Scottish Energy Strategy (SES)  (2017)  and SES Position Statement (2021) – The SES
was published in December 2017 and sets out the Scottish Government’s strategy through to
2050, marking a ‘major transition’ over the next 3 decades in terms of energy management,
demand reduction and generation. The SES sets 2 new targets for the Scottish energy system
by 2030: The equivalent of 50% of the energy for Scotland’s heat, transport and electricity
consumption to be supplied from renewable sources; and, an increase by 30% in the
productivity of energy use across the Scottish economy. The SES recognises that reaching
the 50% target by 2030 ‘will be challenging’ but the target demonstrates ‘the SG’s commitment
to a low carbon energy system and to the continued growth of the renewable energy sector in
Scotland’. 
SPP, NPF3 and NPF4 
Despite now being seven years old, NPF3 and SPP are extant statements of Scottish
Government planning policy and will remain in place until such time as NPF4 is adopted on
13.2.23. The status of NPF3 and SPP has not changed and they are significant material
considerations in the determination of the present application.

Page 54

The SPP introduced a presumption in favour of development that contributes to sustainable
development. Paragraph 28 states: “The planning system should support economically,
environmentally and socially sustainable places by enabling development that balances the
costs and benefits of a proposal over the longer term. The aim is to achieve the right
development in the right place; it is not to allow development at any cost” 
Renewable energy generation targets are supported by NPF3 but that support is qualified as
mirrored in SPP. It is stated at paragraph 4.7: “The pressing challenge of climate change
means that our action on the environment must continue to evolve, strengthening our longer-
term resilience. A planned approach to development helps to strike the right balance between
safeguarding assets which are irreplaceable, and facilitating change in a sustainable way.”
Paragraph 4.4 of NPF 3 recognises that Scotland’s landscapes are spectacular, contributing
to our quality of life, national identity and visitor economy. Landscape quality is found across
Scotland and all landscapes support place-making. 
Revised Draft NPF 4 continues to provide a supportive policy framework for development of
this type, and as has been referenced previously, specifically supports the expansion of hydro
power generation at Cruachan as a National Priority. 
Having due regard to the above subject to the recommended advice and conditions it
is considered that the proposal is consistent with the provisions of: SPP, NPF3, the
Scottish Energy Strategy 2017; NPF3 and Revised Draft NPF4 Policies 1 and 11 , in this
regard, which represent the Scottish Governments most up to date position on this type
of development. 
U. CONCLUSION & RECOMMENDATION 
Both SPP and the Argyll & Bute Local Development Plan support renewable energy
developments provided it has been adequately demonstrated that there would be no
unacceptable significant adverse effects.  Support is also offered by revised Draft NPF4, its
overall climate change objectives, and policy 11 in particular which supports developments
such as this, as well as identifying Cruachan Expansion as a specific Nationally Important
project in its own right. 
There is clear support throughout national and international policy that renewable energy
projects, such as the proposed development, are supported and do have the capability of
making an active contribution to the net zero targets Scotland is required to reach. The
proposal will make a direct contribution to meeting the range of both international and national
energy targets, whilst producing clean energy that meets the legally binding low carbon and
net zero targets. The proposal will directly contribute to tackling climate change by reducing
our reliance on fossil fuels for producing energy. 
The specific inclusion of the Cruachan expansion proposal in Revised Draft NPF4 (Carried
over from NPF3) as a nationally important and individually identified project which promotes
sustainable development and assist in addressing the climate emergency is a substantive
policy consideration in support of the proposal. 
It is accepted that the proposal would make an important contribution to the Scottish
Government’s renewable energy targets and reduce greenhouse gas emissions and these
matters are important benefits which have been carefully considered and carry substantive
weight in determining whether the proposals should be supported.

Page 55

Officers therefore conclude, that subject to the recommended advice and conditions from
external and internal consultees, that the proposal is consistent with the relevant provisions of
SPP and the Argyll and Bute Local Development Plan in all other respects. 
V.    RECOMMENDATION: 
Officers recommend that Members agree that the Council does not object, subject to
the conditions as detailed below 
Matters which the Council recommend that the ECU consider prior to determination 
 That the conditions recommended by other consultation bodies are included in the suite
of final conditions, the Council would expect to be consulted on any final list of conditions
prior to permission being granted, should Scottish Ministers be minded to do so. 
 The Council would also expect to be consulted on any further mitigation, changes to the
layout should the proposal be required to be amended in line with any further advice
provided by other consultation bodies. 
Conditions to be considered by ECU for inclusion in overall suite of conditions 
Conditions Recommended by other ECU Consultation Bodies 
 NatureScot (conditions recommended by them in their final response to include Habitat
restoration and biodiversity management plans) 
 SEPA (Monitoring; Construction Environment Management Plan, Waste Management
Plan. Peat Management Plan, Acid Rock monitoring and extracted rock material storage
and use strategy) 
 Scottish Forestry (Compensatory Planting details); 
 Transport Scotland;  (Conditions as set out in their consultation response). 
 RSPB (Habitat Management and Landscape integration Plan (HMP); 
Conditions Recommended by the Council to be considered by the ECU 
Biodiversity Officer 
 Prior to the commencement of development a Habitat and biodiversity management
and enhancement strategy shall be provided to the planning authority for their
approval in consultation with NatureScot and RSPB. 
Reason: To ensure that habitat management/restoration and biodiversity enhancement
are carried out in accordance with LDP and NPF 4 Objectives. 
 Prior to the Commencement of works a Construction Environment Management
Plan (CEMP) shall be submitted to the planning authority and shall provide
details of the mitigation, management and enhancement for ornithological
interest, habitat, species, water courses and peat management (CEMP) along
with a series of Tool Box talks to reflect the above and overseen by an Ecological

Page 56

Clerk of Works for the approval of the planning Authority in consultation with
SEPA and NatureScot. 
Reason: To ensure these matters are properly addressed prior to the commencement of
works and that biodiversity and habitat improvements are maximised. 
Area Roads Engineer 
 Prior to the commencement of development an Extracted Materials Management
Plan shall be provided which clarifies the locations of disposal/storage/use sites
and the tonnage and vehicle movements associated with this. The applicant
shall seek to find uses for the waste material within the local area before
considering locations further afield.  Evidence of how this has been
considered shall be included within the Extracted Materials Management
Plan. 
Reason: To ensure the road network is suitable and able to accommodate the
necessary HGV vehicular movement associated with the operations and in the
interests of sustainability to ensure that distances travelled are minimised where
possible. 
 Prior to the commencement of development a Traffic Impact Analysis shall be
undertaken to ensure that cumulative demands on the road network associated
with these proposals and any other permitted or projected major infrastructure
proposals in the area shall be provided to the Planning Authority for the approval
in consultation with Transport Scotland. . This report should include a cumulative
report in concert with other S36 and S37 schemes in the North Argyll/ Loch Awe
area paying particular attention to the possibility of utilizing materials locally to
prevent unnecessary vehicle movements thus reducing the potential for any
related deterioration of the fragile local area roads network. 
Reason: To ensure accurate vehicle movement data is available having regard to
many other proposed major infrastructure in area are proposed, particularly those
associated with Grid Infrastructure Upgrade proposals by SSEN. 
Conservation Policy Advisor 
 Works shall only to be undertaken to any Category A Listed structure in
accordance with any separately approved Listed Building Consent for such works. 
Reason To ensure works to the existing Category A Turbine Hall connected to the
two new access tunnels are examined in sufficient detail to ensure no unacceptable
impact on the integrity and character of the existing listed building and to the
satisfaction of HES who are a statutory consultee on works to a Category A Listed
Building. 
 Prior to the commencement of development further detail of the design and
appearance of ; 
I. the new water inlet structure and associated rock cutting/contouring and
II. the referenced extension to the existing substation

Page 57

shall be provided to the planning authority for their approval prior to the
commencement of works. 
Reason: To ensure the appearance of the works are acceptable in the context of the
setting of the Category B listed Dam and also to ensure any potential wider
landscape impacts are minimised. 
Environmental Protection Officer 
 Surface work and underground work should be restricted to: 
• Monday to Friday: 0700 hours until 1900 hours. 
• Saturday: 0700 hours until 1700 hours. 
• Sunday / Public holidays: – no works, except for servicing and maintenance of plant
and equipment and emergency work. 
Reason: In order to protect the amenities of the area from noise and vibration nuisance
and to minimise local community annoyance” 
 Prior to the development commencing detailed information shall be provided on how
the 17 identified private water supplies will be protected during the construction and
operation phases of the proposed development. 
Reason – in the interest of public health and to ensure adequate measures are in place to
protect the identified private water supplies 
Access Manager 
 Prior to the commencement of development an Access Plan and Strategy shall be
submitted for the approval of the Planning Authority. This shall clarify how access to
the formal and informal recreational facilities in the area will be maintained in so far as
is possible during construction operations, and also seek to identify opportunities to
utilise any extracted materials to provide footpath improvements to the surrounding
network. 
Reason: To ensure impacts on the footpath network are minimised and local use of
extracted materials is maximised. 
Worker Housing Strategy 
 Prior to the commencement of development, a strategy for housing incoming
construction workers shall be submitted to and approved in writing by the Planning
Authority.  Thereafter the development shall be carried out in accordance with the
approved details. 
Reason:  In order to mitigate the adverse effects on tourist accommodation  and in the
Oban and Lorn housing market area in accordance with the requirements of NPF4, and in
particular Policy 11C and Policy 25 Objectives. 
Other recommended conditions 
 No works shall commence to form the new quayside and associated permanent
buildings until further details of the design, appearance and materials proposed
associated with these works are submitted to the planning authority for their approval.

Page 58

Such details shall include measures to minimise environmental impact and maximise 
biodiversity enhancement through design, layout and landscaping to form habitat 
opportunities on the permanent quayside site and maximise landscape integration 
from open water views in particular. 
Reason:  to ensure that permanent visual impacts, particularly from open water
recreational users are minimised and biodiversity opportunities maximised in design and
construction detail.