Democracy Spraffa

Agenda Document Pack - Housing and Social Wellbeing Committee - 29/11/2023

Perth and Kinross Council · 29 November 2023
Back to Housing and Social Wellbeing Committee — 29 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
22/11/2023 
A hybrid meeting of the Housing and Social Wellbeing Committee will be held in
the Council Chamber on Wednesday, 29 November 2023 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Tom McEwan  (Convener)
Councillor Sheila McCole  (Vice-Convener)
Councillor Jack Welch  (Vice-Convener)
Bailie Chris Ahern
Councillor Peter Barrett
Councillor Bob Brawn
Bailie Rhona Brock
Councillor Stewart Donaldson
Councillor Angus Forbes
Councillor Michelle Frampton
Councillor Ian James
Councillor Brian Leishman
Councillor Iain MacPherson
Bailie Claire McLaren
Councillor Frank Smith
Page 1 of 232

Page 2

Page 2 of 232

Page 3

Housing and Social Wellbeing Committee 
Wednesday, 29 November 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF HOUSING AND SOCIAL WELLBEING
COMMITTEE OF 25 OCTOBER 2023 FOR APPROVAL
(copy herewith) 
5 - 6 
4 POLICE AND FIRE REFORM: LOCAL SCRUTINY AND
ENGAGEMENT   
4(i)  SCOTTISH FIRE AND RESCUE SERVICE 6-MONTHLY
PERFORMANCE REPORT - APRIL TO SEPTEMBER 2023
Report by Area Manager, Local Senior Officer, Scottish Fire and
Rescue Service (copy herewith 23/334) 
7 - 24 
4(ii)  PERTH AND KINROSS LOCAL POLICING AREA SIX-MONTHLY
POLICE REPORT - APRIL TO SEPTEMBER 2023
Report by Chief Superintendent, Police Scotland D Division
(Tayside) (copy herewith 23/335) 
25 - 50 
5 STRATEGIC HOUSING INVESTMENT PLAN 2024/25 - 2028/29
Report by Strategic Lead, Economy, Development and Planning
(copy herewith 23/336) 
51 - 104 
6 BEECHGROVE HOUSE
Report by Strategic Lead, Economy, Development and Planning
(copy herewith 23/337) 
105 - 120 
7 WARM WELCOME AND GOOD FOOD FUNDS
Report by Director, Strategy, People and Resources (copy herewith
23/338) 
121 - 160
Page 3 of 232

Page 4

8  5TH LOCAL CHILD POVERTY ACTION REPORT
Report by Director, Strategy, People and Resources (copy herewith
23/339) 
161 - 206 
9 COMMUNITY INVESTMENT FUND 2023/24
Report by Head of Culture & Communities Services (copy herewith
23/340) 
207 - 220 
10  AFFORDABLE HOUSING MEMBER/OFFICER WORKING
GROUP - OUTCOME REPORT
Report by Executive Director (Communities) (copy herewith 23/241) 
221 - 232 
Page 4 of 232

Page 5

HOUSING AND SOCIAL WELLBEING COMMITTEE 
Minute of hybrid meeting of the Housing and Social Wellbeing Committee held in the
Council Chambers, 2 High Street, Perth on 25 October 2023 at 9.30am. 
Present: Bailies C Ahern, R Brock and C McLaren; Councillors P Barrett, B Brawn,
S Donaldson, J Duff (substituting for Councillor I James), A Forbes, M Frampton,
B Leishman, I MacPherson, S McCole, T McEwan, F Smith and J Welch. 
In Attendance: B Renton, Executive Director (Communities); E Ritchie, S Coyle, N
Lennon, M Smith, S Watson, J McOmish, S Robertson (up to and including Item 5),
R Ross (all Communities); A Taylor, R Ramsay and M Pasternak (all Corporate and
Democratic Services). 
Also in Attendance: Chief Inspector T Leonard, Sergeant L Stewart (up to and
including Item 5) and Detective Chief Inspector Jennifer Reid (for Item 6 only) (all
Police Scotland); Group Commander S Kabamba and Station Commander C Sands
(both up to and including Item 5) (both Scottish Fire and Rescue Service); L Palmer
(from Item 6 onwards) (Tenant Representative). 
Apology for Absence: Councillor I James. 
Councillor T McEwan, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor T McEwan welcomed everyone to the meeting.  An apology for
absence and a substitution were noted as above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interests in terms of the Councillors’ Code of
Conduct 
3. MINUTE OF PREVIOUS MEETING 
The minute of the meeting of the Housing and Communities Committee of 21
June 2023 was submitted and approved as a correct record. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
The Outstanding Business Statement was noted, and it was agreed to remove
the completed actions. 
5. TACKLING ANTI-SOCIAL BAHAVIOUR IN PARTNERSHIP 
Sergeant Lee Stewart from Police Scotland, Station Commander Cammy
Sands from Scottish Fire and Rescue Services and S Robertson from Perth and
3
Page 5 of 232

Page 6

Kinross Council’s Safer Communities Team provided a joint slide-based presentation
covering all aspects of Tackling Anti-Social Behaviour in Partnership. 
Following the presentation, Sergeant Stewart, Station Commander Sands and
S Robertson all answered members’ questions thereon. 
The Convener thanked Sergeant Stewart, Station Commander Sands and
S Robertson for their very informative presentation and thanked them for their
attendance. 
SERGEANT L STEWART, GROUP COMMANDER S KEBAMBA, STATION
COMMANDER C SANDS AND SAFER COMMUNITIES CO-ORDINATOR S
ROBERTSON ALL LEFT THE MEETING AT THIS POINT. 
THERE FOLLOWED A SHORT RECESS AND THE MEETING RECONVENED AT
11.10AM. 
6. TACKLING VIOLENCE AGAINST WOMEN AND GIRLS IN PERTH AND
KINROSS 
Jennifer McOmish from Perth and Kinross Council’s Safer Communities Team
and Detective Chief Inspector Jennifer Reid from Police Scotland provided a slide-
based presentation covering all aspects of Tackling Violence Against Women and
Girls in Perth and Kinross. 
Following the presentation, J McOmish and DCI Reid both answered
members’ questions thereon. 
The Convener thanked J McOmish and DCI Reid for their very informative
presentation and thanked them for their attendance. 
7. ANNUAL ASSURANCE STATEMENT 2022/2023 – SCOTTISH HOUSING
REGULATOR 
There was submitted a report by the Executive Director (Communities)
(23/277) providing a brief overview of the Framework and appends the Annual
Assurance Statement 2022/23 for approval.  
Resolved:
(i) The requirement to submit an Annual Assurance Statement, be noted.
(ii) The Annual Assurance Statement as detailed in Appendix 2 of Report 23/277,
be approved. 
~~~~~~~~~
Page 6 of 232

Page 7

NOT PROTECTIVELY MARKED 
Perth And Kinross Council 
Housing And Social Wellbeing Committee 
29 November 2023 
SCOTTISH FIRE AND RESCUE SIX-MONTHLY PERFORMANCE REPORT
APRIL 2023 – SEPTEMBER 2023 
Report by Area Manager Jason Sharp, Local Senior Officer, Scottish Fire and
Rescue Service
(Report No. 23/334) 
Abstract
The report contains performance information relating to the six-month period
(April 2023 – September 2023) of 2023-24 on the performance of the Scottish
Fire and Rescue Service in support of Member scrutiny of local service
delivery.
1. PURPOSE OF THE REPORT 
To provide information for the Committee regarding the performance of the
Scottish Fire and Rescue Service, against the priorities, performance
indicators and targets detailed within the Local Fire and Rescue Plan for
Perth and Kinross 2020-23, to facilitate local scrutiny. 
2 RECOMMENDATIONS 
It is recommended that members note and scrutinise the statistical
information contained in this report in conjunction with Appendix 1. 
3 FINANCIAL IMPLICATIONS 
None.
4 PERFORMANCE 
4.1 A performance management framework has been developed to facilitate the
monitoring of performance against the agreed priorities and outcomes
ensuring effective targeting of resources and the principles of Best Value are
met. 
4(i)
Page 7 of 232

Page 8

NOT PROTECTIVELY MARKED 
4.2 The Local Fire and Rescue Plan for Perth & Kinross 2020-23 was approved
by the Housing and Communities Committee on the 2nd of December 2020. 
4.3 The priorities and outcomes contained within the Local Fire and Rescue Plan
reflect ‘place’ and the contribution of Scottish Fire and Rescue Service to the
Perth and Kinross Community Plan (LOIP) 2017-27 and Community Planning
Partnership. 
4.4 In summary the following local priorities and targets are detailed within the
plan: 
Priority 1 - Improving Fire Safety in the Home
Priority 2 - Improving Fire Safety and Resilience in the Business Community
Priority 3 - Minimising the Impact of Unintentional Harm  
Priority 4 - Reducing Unwanted Fire Alarm Signals 
Priority 5 - Reducing Deliberate Fires
Priority 6 - Effective Risk Management and Operational Preparedness 
4.5 Appendix 1 attached to this report provides a detailed breakdown and
analysis of all data collected during the reporting period. A performance
summary and scorecard is detailed on page 5 of the report. In addition,
further sections are included to provide Members with an overview of a range
of notable incidents and events undertaken by the local personnel/stations in
support of prevention activities and preparation for emergency response. 
5 EQUALITY IMPACT ASSESSMENT 
5.1  Not applicable. 
6 ENVIRONMENTAL ISSUES 
6.1  There are no environmental issues arising as a consequence of this report.
7 SUMMARY 
7.1  The attached report updates members regarding significant community
safety engagement activities and operational matters; and gives context to
the performance of the Scottish Fire and Rescue Service in the Perth and
Kinross area. 
Area Manager Jason Sharp
Local Senior Officer
Perth & Kinross, Angus and Dundee
Fire and Rescue Headquarters
Blackness Road,
Dundee DD1 5PA
Page 8 of 232

Page 9

Appendix 1
April-September: 2023/24 
MONITORING REPORT
Covering the activities and performance in
support of the Local Fire and Rescue Plan for
Perth & Kinross.
4(i)
Page 9 of 232

Page 10

2 
ABOUT THE STATISTICS IN THIS REPORT 
The activity totals and other statistics quoted in this report are provisional in nature and subject to change as
a result of ongoing quality assurance and review. 
Because all statistics quoted are provisional there may be differences in the period totals quoted in our reports
after original publication which result from revisions or additions to the data on our systems. 
From 2015-16 onwards responsibility for the publication of end-year statistical data transferred from the
Scottish Government to the SFRS. This change of responsibility does not affect the status of the figures
quoted in this and other SFRS reports presented to the Committee. 
Page 10 of 232

Page 11

3 
TABLE OF CONTENTS PAGE  
Introduction 
Performance Summary
Performance Highlights
4
5
6
Priority 1 - Improving Fire Safety in The Home
HI 1 – Accidental Dwelling Fires (ADF)
HI 2 – ADF Fatal Casualties
HI 3 – ADF Non-Fatal Casualties
Priority 2 - Improving Fire Safety and Resilience in the Business Community
HI 4 - Non-Domestic Building Fires            
HI 5 – Fatal Casualties in Non-Domestic Buildings 
HI 6 – Non-Fatal Casualties in Non-Domestic Buildings 
Priority 3 - Minimising the Impact of Unintentional Harm
HI 7 – Road Traffic Collision (RTC) Incidents
HI 8 – Fatal RTC Casualties
HI 9 – Non-Fatal RTC Casualties
Priority 4 - Reducing Unwanted Fire Alarm Signals
HI 10 – Unwanted Fire Alarm Signals (UFAS)
Priority 5 - Reducing Deliberate Fires 
HI 11 – Deliberate Primary Fires
HI 12 – Deliberate Secondary Fires
Priority 6 - Effective Risk Management and Operational Preparedness 
APPENDIX 1: COMMUNITY SAFETY ENGAGEMENT PROGRAMMES 
APPENDIX 2: NOTABLE INCIDENTS 
7
8
9
10 
11 
12 
13     
14
Page 11 of 232

Page 12

4 
INTRODUCTION
This report covers the SFRS’s performance and activities in support of the six priorities in the Local
Fire and Rescue Plan for Perth & Kinross, namely:
• Priority 1 - Improving fire safety in the home
• Priority 2 - Improving fire safety and resilience in the business community
• Priority 3 - Minimising the impact of unintentional harm
• Priority 4 - Reducing unwanted fire alarm signals
• Priority 5 - Reducing deliberate fires
• Priority 6 - Effective risk management and operational preparedness 
As well as supporting the six priorities within the Local Fire and Rescue Plan for Perth & Kinross,
this monitoring report shows how SFRS activities and performance contribute to the wider priorities
of the Perth & Kinross Council Community Planning Partnership (CPP), as set out in the Perth &
Kinross Community Plan (LOIP).
The figures in this report are provisional, to provide the Committee with the SFRS’s direction of travel
within the Perth & Kinross area, in terms of performance against headline indicators and targets.
Most figures will not change; however, members should note that there may be some small variations
for some indicators when the final confirmed figures are published by the SFRS.
The Perth & Kinross Council Housing and Social Wellbeing Committee agreed the new Local Fire
and Rescue Plan for Perth & Kinross on 2 December 2020, covering a three-year period. In support
of delivering the priorities in this plan, 12 headline indicators and targets have been set, and form
the basis of this quarterly monitoring report. 
Page 12 of 232

Page 13

5 
PERFORMANCE SUMMARY
The table below provides a summary of activity and year to date (YTD) performance against Headline
Indicators and annual targets. It aims to provide, at a glance, our direction of travel during the current reporting
year. 
HI 1
Accident Dwelling Fires (ADF) 
HI 2
ADF Fatal Casualties 
HI 3
ADF Non-Fatal Casualties 
56 Incidents 
YTD – 56 Incidents
Annual Target – 122 Incidents  
2 Casualties
YTD – 2
Annual Target – 0 
11 Casualties
YTD – 11 
Annual Target – 20
HI 4
Non-domestic Building fires 
HI 5
Fatal Casualties in Non-Domestic
Building Fires 
HI 6
Non-Fatal Casualties in Non-
Domestic Building Fires 
15 Incidents
YTD – 15 Incidents
Annual Target – 57 Incidents  
0 Casualties
YTD – 0
Annual Target – 0  
0 Casualties
YTD – 0
Annual Target – 9
HI 7
Road Traffic Collision (RTC)
Incidents 
HI 8
Fatal RTC Casualties 
HI 9
Non-Fatal RTC Casualties 
37 Incidents
YTD – 37 Incidents
Annual Target – 90 Incidents 
4 Casualties
YTD – 4
Annual Target – 0                    
30 Casualties                       
YTD – 30
Annual Target – 67
HI 10
Unwanted Fire Alarm Signals 
HI 11
Deliberate Primary Fires 
HI 12
Deliberate Secondary Fires 
212 Incidents
YTD – 212 Incidents
Annual Target – 615 Incidents   
16 Incidents   
YTD – 16 Incidents
Annual Target – 32 Incidents  
57 Incidents
YTD – 57 Incidents
Annual Target – 76 Incidents 
Year-to-Date Legend  
Below headline target 
Less than 10% above headline target 
More than 10% above headline target 
Page 13 of 232

Page 14

6 
PERFORMANCE HIGHLIGHTS 
During the reporting period the SFRS attended a total of 1127 incidents across Perth & Kinross. 
Of the 12 headline indicators and targets, the following performance should be noted: 
HI 1 - There were 56 Accidental Dwelling Fires (ADF) reported. Fire damage at 41 incidents was
reported as limited to item of ignition and 7 limited to the room of ignition requiring a hosereel or CO2
extinguisher.  Twenty-Eight properties were fitted with smoke detection, of which 22 operated and gave
early warning to the occupants. The main cause was cooking and human contributing factor being
distraction, 7 with drugs or alcohol being involved. 
HI 2 / HI 3 - Unfortunately there were 2 ADF Fatal Casualties and 11 ADF Non-Fatal Casualties which
is an increase on the previous reporting period. 
HI 4 - There were 15 Non-Domestic Building Fires which reflects a decrease on the previous period (19).
Four incidents resulted in minor damage, 1 involved the floor of origin, 3 limited to room of origin and 7 with
limited to item of ignition. At 6 of these incidents’ firefighters extinguished the fire using a fire extinguisher or
hosereel. 
HI 5 / HI 6 – There were 0 Non-Domestic Fatal Fire Casualties and 0 Non-Domestic Casualties
recorded during this period. 
HI 7 - We attended 37 Road Traffic Collision’s (RTCs) to assist with scene safety or to extricate
occupants trapped as a result of a collision. Reporting a decrease in comparison to the previous period. Of
the 37 incidents attended, 9 incidents required technical extrication to release casualties.
HI 8 / HI 9 - Of the 37 RTC incidents we attended, there were 4 RTC Fatalities and 30 Non-Fatal Casualties
from around the P&K area. 
HI 10 - The SFRS mobilised to 212 Unwanted Fire Alarm Signals (UFAS) incidents from a total of 717
False Alarms during the reporting period, a reduction of 134 UFAS incidents. Schools were responsible for
58 activations in Q1-Q2 2022/23 which has reduced to 21, Offices 19 reducing to 4. 
HI 11 / HI 12 - There were 16 Deliberate Primary Fires reported.  8 involved crop or woodland, 3
occurred within a building at HMP Perth, 3 involved vehicles and 2 outdoor structures.  There were 57
Deliberate Secondary Fires reported.  There were no trends identified, with incidents spread across all
ward areas however 33 incidents occurred within Perth. 
Our firefighters continue to train in all aspects of their role to ensure they are operationally prepared and
we continue to gather information on local risks to assist us in an emergency through our Operational
Intelligence visits.
We continue to deliver face to face engagement in partnership within our communities to ensure we can
continue to help those who are most vulnerable. 
Page 14 of 232

Page 15

7 
Indicator Description
HI 1 – Accidental Dwelling Fires
The largest single type of primary fire within P&K, our aim is to reduce the rate of ADF’s in the home and
their prevention in a key focus of the SFRS community safety activity.
HI 2 – ADF Fatal Casualties
People for whom fire has been clearly identified as the cause of death, even if they die some-time
after the actual fire. 
HI 3 – ADF Non-Fatal Casualties
This counts all types of non-fatal fire injury in the home, including precautionary checks. 
What we aim to Achieve
Priority One: Improving Fire Safety in the Home, meeting the headline targets will also support
a long-term vision in the Perth & Kinross LOIP objectives:
• Developing educated, responsible and informed citizens
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations
Performance Management
Within Perth & Kinross we continue to work with our partners to ensure we positively contribute
to reducing the risk to our communities and staff by analysis of our operational activities and
targeting those most at risk and vulnerable, particularly around unintentional harm in the
home. These targeted initiatives delivered in partnership will continue to develop and improve
as we move forward together to ensure we provide the most appropriate support for our
communities with regard to unintentional harm. 
20/21 21/22 22/23 23/24 Annual
Target
HI1 53 51 44 56 122 
20/21 21/22 22/23 23/24 Annual
Target
HI2 0 0 0 2 0
HI3 14 10 13 11 20
PRIORITY 1 - IMPROVING FIRE SAFETY IN THE HOME
0
5
10
15
19/20 20/21 21/22 22/23
HI 2 & HI 3
ADF Fatal Fire Casualties ADF Non-Fatal Fire Casualties
0
10
20
30
40
50
60
19/20 20/21 21/22 22/23
HI 1
Incidents
Page 15 of 232

Page 16

8 
Indicator Description
HI 4 - Non-Domestic Building Fires Applicable to the Act
Non-domestic buildings applicable to Part 3 of the Fire (Scotland) Act 2005 (‘The Act’) (e.g. care homes,
hotels and hospitals etc.) 
HI 5 – Fatal Fire Casualties in Non-Domestic Building Fires applicable to the Act
People for whom fire has been clearly identified as the cause of death, even if they die sometime after
the actual fire. 
HI 6 – Non-fatal Fire Casualties in Non-Domestic Building Fires applicable to the Act
Counts all types of non-fatal fire injury in non-domestic buildings, including precautionary checks. 
What we aim to Achieve
Priority Two: Improving Fire Safety and Resilience in the Business Community, we also link this headline
target to improving the following Perth & Kinross LOIP outcomes:
• Promoting a prosperous, inclusive and sustainable economy
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations
Performance Management
In-line with our Fire Safety Enforcement Plan, Fire Safety Enforcement Officers support local businesses to
enable suitable and timely legislative fire safety guidance and enforcement to be undertaken. We also
continue to engage and support local and national business forums to ensure the right level of consistent
information is provided to the business community.
99 Audits were undertaken during the reporting period inc.34 Care Homes; 4 Hospitals, 12 Hotels, 7 HMOs,
14 Prison (Castle Huntly/Perth), 13 Guest Houses and 6 Post Fire Audits following fire related incidents at
relevant premises.  This involved engaging with local businesses to maintain safety procedures and to
ensure the safety of their staff and members of the public. There were no enforcement/formal notices
issued within any business in Perth and Kinross. 
20/21 21/22 22/23 23/24 Annual
Target
HI5  0 0 0 0 0
HI6 0 0 0 0 9 
20/21 21/22 22/23 23/24 Annual
Target
HI4 21 20 19 15 57
PRIORITY 2-FIRE SAFETY AND RESILIENCE IN THE BUSINESS COMMUNITY
0
5
10
15
20
25
30
19/20 20/21 21/22 22/23
HI 4
Incidents
0
1
2
3
4
5
6
7
19/20 20/21 21/22 22/23
HI 5 & HI 6
Fatal Fire Casualties Non-Fatal Fire Casualties
Page 16 of 232

Page 17

9 
Indicator Description
HI 7 - RTC Incidents
The SFRS has become increasingly involved in more non-fire related prevention work, in support of its
role in promoting the wider safety and well-being of its communities, including minimising the impact of
unintentional harm.
HI 8 – Fatal RTC Casualties
As a headline target, the aim is to reduce the risk of death from RTC’s in Perth & Kinross.
HI 9 - Non-fatal RTC Casualties
As a headline target, the aim is to reduce the risk of injury from RTC’s in Perth & Kinross. 
What we aim to Achieve
As well as helping to deliver Priority three: Minimising the Impact of Unintentional Harm, we also link these
headline targets to improving the following Perth & Kinross LOIP outcomes:
• Developing educated, responsible and informed citizens
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations
Performance Management
RTCs account for a high number of casualties every year which requires a multi-agency partnership
approach to reduce these risks to those on our roads. 
P&K Road Safety Partnership is a multi-agency group working locally to establish reduction priorities and
influence the content of the P&K Road Safety Plan. In partnership, Perth Fire Station continues to host the
Motorcycle Rider Refinement course which is led by Police Scotland and supported by the Institute of
Advanced Motoring. The introduction of the Young Driver Programme and VR headsets provide an
emersive experience to users on Road Saftey. Input has been undertaken at local Secondary Schools and
HMP Perth with feedback being very positive. A replacement for Safe Drive Stay Alive, the new equipment
and material allows users to experience the aftermath of an RTC until extrication. 
20/21 21/22 22/23 23/24 Annual
Target
HI7 31 29 46 37 90 
20/21 21/22 22/23 23/24 Annual
Target
HI8 0 3 3 4 0
HI9 9 16 25 30 67
PRIORITY 3 – MINIMISING THE IMPACT OF UNINTENTIONAL HARM
0
10
20
30
40
50
60
19/20 20/21 21/22 22/23
HI 7
RTC
0
10
20
30
40
50
19/20 20/21 21/22 22/23
HI 8 & HI 9
Fatalities Casualties
Page 17 of 232

Page 18

10 
Indicator Description
HI 10 – Unwanted Fire Alarm Signals (UFAS)
Automatic Fire alarms (AFA’s) are fundamental to providing early warning from fire, giving people the
chance to evacuate safely. However, to be effective, they must be properly installed, maintained and
supported by a robust fire safety management regime implemented by the duty holder.
As a headline target, the aim is to improve fire safety management and awareness, by reducing the
number of attendances to UFAS from automatic systems in Non-Domestic buildings. 
What we aim to Achieve
As well as helping to deliver Priority Four: Reducing Unwanted Fire Alarm Signals, we also link this
headline target to improving the following Perth & Kinross LOIP outcome:
• Promoting a prosperous, inclusive and sustainable economy
Performance Management
UFAS from AFA’s has an impact in terms of unnecessary blue light journeys, redirecting SFRS
resources away from other activities such as community safety engagement and causing considerable
disruption to businesses. 
Operational crews continue to investigate the cause of every UFAS incident to ensure the appropriate level
of engagement with the duty holder was undertaken when in attendance. Every UFAS incident that the
SFRS attends is used as an opportunity to educate the Duty Holder on the impact UFAS has on their
businesses, the community and the Fire and Rescue Service. 
Following the UFAS Stakeholder Consultation, from 1 July 2023 the SFRS no longer mobilise to AFA’s
within Non-Sleeping risk premises unless a fire is confirmed.   This has led to a significant reduction in
UFAS mobilisations within P&K providing opportunities for reinvesting the released capacity into areas that
would deliver greater value, such as upskilling, training and further prevention work. 
20/21 21/22 22/23 23/24 Annual
Target
HI10 314 321 346 212 615
Property Types  
Hospital/ Medical Care  23
Secondary and Primary Schools 21
Hotels 19
Care Homes, Sheltered Housing 13
Offices and Call Centres 4
PRIORITY 4 - REDUCING UNWANTED FIRE ALARM SIGNALS
0
100
200
300
400
19/20 20/21 21/22 22/23
HI 10
UFAS Incidents
76%
21%
3%
All False Alarms (717) UFAS = 41%
Equipment Faliure Good Intent Malicious
Page 18 of 232

Page 19

11 
Indicator Description
HI 11 – Deliberate Primary Fires
These indicators account for all types of fire that are believed to have been started intentionally.
• Fires in the home 
• Fires in non-domestic buildings
• Fires in motor vehicles 
HI 12 – Deliberate Secondary Fires
These deliberate fires cover the majority of outdoor fires including grassland and refuse fires and include fires
in derelict buildings, but not chimney fires. 
What we aim to Achieve
As well as helping to deliver Priority Five: Reducing Deliberate Fires, we also link this headline target to
improving the following Perth & Kinross LOIP outcomes:
• Developing educated, responsible and informed citizens
• Promoting a prosperous, inclusive and sustainable economy
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations
Performance Management
The proactive approach adopted particularly around youth engagement endeavours to reduce the number
of deliberate fires, particularly secondary fires, as part of a wider youth awareness education initiative. 
These include a targeted approach working with local schools along with national campaigns during the
summer season to reduce this unacceptable, anti-social behaviour. This continual programme of input with
regard deliberate fire raising is delivered alongside other educational safety programmes across Perth and
Kinross particularly the Perth City area. 
19/20 20/21 21/22 22/23 Annual
Target
HI12 37 61 52 57 76 
19/20 20/21 21/22 22/23 Annual
Target
HI11 19 16 9 16 32
PRIORITY 5 - REDUCING DELIBERATE FIRES
0
2
4
6
8
10
12
14
19/20 20/21 21/22 22/23
HI 11
All Deliberate Primary Fires
0
10
20
30
40
19/20 20/21 21/22 22/23
HI 12
All Deliberate Secondary Fires
Page 19 of 232

Page 20

12 
Risk Management and operational preparedness is a key area of work for the SFRS. In Perth & Kinross,
this means:
• Knowing what the risks are in Perth & Kinross and then making plans, so we are resilient to respond to
any event
• Being prepared to respond to national threats or major emergencies
• Developing flexibility to deploy crews, to take on a broadening role within the community
• Firefighters being equipped to deal with emergencies safely and effectively and our stations being in a
constant state of readiness
• Safe, secure, vibrant and sustainable communities
• An inclusive and sustainable economy
• An enhanced, protected and enjoyed natural and built environment
• Improved physical, mental and emotional health and well-being 
What we aim to Achieve
As well as helping to deliver Priority Six: Effective Risk Management and Operational Preparedness, our
activities also support improving the following Perth & Kinross LOIP objectives:
• Developing educated, responsible and informed citizens
• Promoting a prosperous, inclusive and sustainable economy
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations
During the reporting period we have delivered our training commitment to operational firefighters, whereby
we trained and confirmed their preparedness to deal with: 
• Breathing Apparatus
• Casualty Care
• HAZMAT
• Road Traffic Collisions
• Marine Firefighting
• Water Awareness 
Within P&K, our On-Call Volunteer stations, Kinloch Rannoch, Kirkmichael and Glenshee now have
enhanced capabilities which allows them to be mobilised to RTCs ensuing resilience in our more remote
communities.  In addition Flood Response Stations (Comrie, Blairgowrie and Aberfeldy,) are now fully
operational and were utilised during the recent Storm Babet to support Swift Water Rescue Stations. Alyth
and Pitlochry have been designated as Wildfire Response Stations and have been issued with specialist PPE
and equipment/training will be allocated in due course.
Firefighters continue to conduct Operational Intelligence visits to sites within their station area so that they
are familiar with the associated risks and hazards and, if required, can take effective actions in dealing with
incidents at these sites. They also continue to conduct Home Safety Visits, ensuring that all High-Risk
properties were visited and telephone contact made with all Medium and Low Risk properties.
Our Development Firefighter yearly assessments are also continuing to ensure that they are developing their
skills in line with their 3-year Modern Apprenticeship. We are also continuing our advertising campaign with
a view to filling a number of vacant posts within our On-Call stations. 
PRIORITY 6 - RISK MANAGEMENT AND OPERATIONAL PREPAREDNESS
Page 20 of 232

Page 21

13 
This section provides details of Community Safety Engagement initiatives undertaken within P&K. The Safer
Communities Partnership work together to continually provide community safety messages, education,
training and support. This compliments risk reduction strategies to support our communities, particularly those
most vulnerable. Working collaboratively, it also supports the priorities within the Local Fire and Rescue Plan
and the wider Perth & Kinross Council Community Planning Partnerships priorities. 
APPENDIX 1: COMMUNITY SAFETY ENGAGEMENT PROGRAMMES
Page 21 of 232

Page 22

14 
SFRS attended 1127 incidents of which a number had a serious impact on members of our communities
and their families.
Storm Babet
Specialist crews, including Swift Water Rescue Teams from Perth, Ayrshire, Fife, Aberdeen and Stirling
undertook a number of rescues and evacuations over the 48hrs as a result of Storm Babet.  Also mobilised
were Flood Response Stations from across Perth and Kinross and Aberdeenshire to support local
Communities with the assistance of Scottish Ambulance Special Operations, RNLI, HMCG and Police
Scotland were able to affect a number of challenging rescues. 
Water Safety Education Programme 
FF Kevin Stewart has developed a Water Safety Education Programme in association with the Royal Life
Saving Society (RLSS) and Royal National Lifeboat Institute (RLNI). Delivered to 1991 primary aged pupils
across 7 primary schools. The aim of the pilot has been to refine a programme that will break down the
barriers in our society that regularly prevent children in our community from receiving an education in the
subject of water safety with the ambition being to scale up to 30 primary schools and 8,500+ pupils in the
2024 campaign. 
This is followed up by resources provided to the school to allow for in class lessons. This reaffirms the
lessons taught in a more focused environment allowing the professional educators to do what they do best;
including discussions, making posters and signs etc with feedback to date being very positive. 
APPENDIX 2: NOTABLE INCIDENTS / EVENTS
Page 22 of 232

Page 23

15 
“Thanks Kevin, 
The children really enjoyed the assembly and have been talking about it lots in class since.  Their teachers
have spoken about their really great recall.
Thanks for your efforts in personalising this to Scone specifically – it’s made an impact!” 
Lynne Lambert - Headteacher Robert Douglas Memorial Primary School 
Perth Firefighter receives Chief Officer Commendation 
Ryan Witkowski from Scone received a Brave@Heart award and the St Andrews Award Medal at a ceremony
at Edinburgh Castle. Ryan, who is based at Perth Community Fire Station, was returning home from an event
with his family when he noticed smoke billowing from a tenement block. On investigation he came across a
well-developed fire on the top floor of a three-storey building. Ryan quickly began to evacuate the building
and led eight people to safety ensuring that nobody was injured or trapped.  Ryan said: “It just felt normal to
respond because of my role as a firefighter, but it was difficult for my family who were there with me at the
time of the incident. 
Page 23 of 232

Page 24

Page 24 of 232

Page 25

OFFICIAL: POLICE AND PARTNERS 
OFFICIAL: POLICE AND PARTNERS 
PERTH AND KINROSS COUNCIL 
Housing And Communities Committee 
PERTH AND KINROSS LOCAL POLICING AREA
POLICE REPORT (1st April 2023 – 30th September 2023) 
Report by Chief Superintendent Phil Davison
Police Scotland D Division (Tayside)
(Report No. 23/335) 
1. RECOMMENDATION 
1.1 It is recommended that members note and scrutinise the statistical information
contained in this report in conjunction with Appendix A. 
2. BACKGROUND 
Appendix A –Police Report (1st April 2023 – 30th September 2023) 
2.1 The purpose of this report (Appendix A) is to provide information to the
Committee regarding the performance of Police Scotland to facilitate local
scrutiny. 
2.2 Appendix A will provide information in relation to some of the work which has
taken place within Perth and Kinross Local Policing Area. 
2.3 The content in this report is for information purposes to allow Members to
conduct their scrutiny responsibilities.    
3. FINANCIAL IMPLICATIONS 
3.1. There are no financial implications as a result of this report.    
4(ii)
Page 25 of 232

Page 26

OFFICIAL: POLICE AND PARTNERS 
OFFICIAL: POLICE AND PARTNERS 
4. STAFFING IMPLICATIONS 
4.1 There are no staffing issues as a result of this report. 
5. ENVIRONMENTAL ISSUES 
5.1 This report does not have any impact on the environment. 
6. SUMMARY 
6.1 The attached report provides an update to members regarding significant
operational matters and performance of the local policing area during quarters
1 & 2 of policing year 2023/24. 
7. COMPLIANCE 
7.1 Is the proposal; 
(a) Human Rights Act 1998 compliant? YES 
(b) Equality & Diversity compliant? YES 
Page 26 of 232

Page 27

OFFICIAL 
OFFICIAL 
Perth and Kinross Council
Housing and Social Wellbeing Committee
Police Scotland mid-year report
4(ii)
Page 27 of 232

Page 28

OFFICIAL 
3 | P a g e
Contents 
Introduction and Overview of Local Policing Priorities 
Police Scotland’s strategic objectives 
Perth and Kinross Local Policing Plan 2023-2026 
Performance on a Page
 Local Priority/Activity – Address violence through preventative and enforcement measures
 Local Priority/Activity – Deal with disorder and antisocial behaviour
 Local Priority/Activity – Tackle acquisitive crime and support victims
 Local Priority/Activity – Make our roads safer
 Local Priority Activity -  Public Protection
 Local Priority/Activity – Enable and support effective engagement and communication with the public
 National Priority – Use innovative approaches to accelerate capacity and capability for effective service delivery
 National Priority – Prioritise Wellbeing and keep our people safe, well equipped and protected
Page 28 of 232

Page 29

OFFICIAL 
4 | P a g e
Introduction and Overview of Local Policing Priorities 
As from April 2013, the Police and Fire Reform (Scotland) Act 2012 has required Divisional Commanders to produce and
publish a Local Policing Plan (LPP) for each local authority area. The Perth and Kinross LPP 2023-2026 clearly sets out the
policing objectives for Perth and Kinross and will report to the Housing and Social Wellbeing Committee. Quarterly reports
are produced to allow scrutiny by Perth and Kinross Council Housing and Social Wellbeing Committee. This mid-year report
covers the period from 1 April 2023 to 30 September 2023. 
In line with the Perth and Kinross LPP, these Performance Reports provide a more holistic overview of progress across the
service to meet our strategic outcomes.  This approach provides a wider and more detailed picture of traditional policing
performance measures, supplemented with additional insight and narrative to the many different aspects of policing and
corporate support functions. 
The measures are longer term focussed rather than reflecting the ongoing performance of the day-to-day operational
challenges we face and aim to provide evidence of the effectiveness and impact of our services as a whole. 
We have introduced a number of key performance measures and insights questions in support of our local police plan to
focus attention on impact and outcomes. For example: 
 How effective are the diversionary activities provided?
 How effective are the processes in place to prevent acquisitive crime? 
 How well are we engaging with the public? 
 What progress has been made in terms of collaboration and what percentage of the divisional estate is co-located
with partners? 
To enable a more detailed examination by the Committee of specific local priorities and strategic outcomes, a ‘Spotlight’
focus will be provided on one of the priority areas on a quarterly basis.  The Spotlight focus will rotate each quarter in line
with the expected updates outlined in the Perth and Kinross LPP.   
Page 29 of 232

Page 30

OFFICIAL 
5 | P a g e
Police Scotland’s strategic objectives
Page 30 of 232

Page 31

OFFICIAL 
6 | P a g e
Page 31 of 232

Page 32

OFFICIAL 
7 | P a g e
OFFICIAL
Performance on a Page - 1st April 2023 to 30 September 2023 
Recorded Crimes % point Change Detection Rate % % point Change 
CYTD LYTD 5 Yr
Av.
From
LYTD
From 5
Yr Av. CYTD LYTD 5 Yr
Av.
From
LYTD
From 5 Yr
Av.
ASB and Disorder  
Overall group 4 468 416 440 12.5% 6.4% 34.2% 31.5% 42.2% 2.7% -8%
ASB Incidents 3232 3335 4192 -3.1% -22.9%     
Violence  
Robbery 21 28 17 -25% 18% 90.5% 67.9% 75.3% 22.6% 15.2%
Serious Assault 55 33 39 66.7% 41% 83.6% 78.8% 86.2% 4.8% -2.5%
Common Assault
(excluding Emergency
Workers)
563 588 494 -4.3% 13.9% 70.7% 69.3% 73.2% 1.4% -2.5%
Public Protection  
Overall Group 2 176 206 182 -14.6% -3.7% 65.9% 62.6% 56.9% 3.3% 9%
Rape 25 31 37 -19.4% -33.2% 48% 83.9% 59.9% -35.9% -11.9%
Domestic Abuse 30 24 N/A 25% N/A 76.7% 50% N/A 26.7% N/A
Road Safety  
Speeding offences 672 529 1085 27% -38.1% 99% 100% 100% -0.6% -0.6%
Drink / Drug Driving 89 65 101 36.9% -12.1% 98.9% 95.4% 92.9% 3.5% 6%
Acquisitive Crime  
HBs 106 107 114 -1% -7% 26.4% 32.7% 30.2% -6.3% -3.8%
Dwelling HBs 43 44 39 -2.3% 10.3% 23.3% 20.5% 24.6% 2.8% -1.4%
Motor Vehicle
Crime 117 109 117 7.3% -0.7% 35.9% 51.4% 34.3% -15.5% 1.6%
Fraud 212 204 116 3.9% 82.4% 8% 13.7% 21.7% -5.7% -13.7%
Shoplifting 425 260 286 63.5% 48.3% 53.2% 51.2% 68.7% 2% -15.6%
Page 32 of 232

Page 33

OFFICIAL 
8 | P a g e
OFFICIAL
Overall Group 2’ All Sexual Crimes including Rape & Attempts, Indecent & Sexual Assaults, Prostitution Offences and ‘Other’ Group
2 Crimes.
Overall Group 4’ All Fireraising, Vandalism, Reckless Conduct and ‘Other’ Group 4 Crimes. 
Page 33 of 232

Page 34

OFFICIAL 
9 | P a g e
OFFICIAL
Local Priority/Activity – Address violence through preventative and enforcement measures 
 1 Murder was recorded during the reporting period.   This incident occurred on 8th April 2023 when a 20 year old male
from Perth was assaulted at an address in the city.  The investigation was led by officers from Perth and Kinross CID and
a 19 year old male was arrested and remains remanded in custody awaiting trial.
 21 robberies were recorded during the reporting period.  This is a welcome reduction of 25% or 7 fewer crimes than the
same period last year.  
 Where robberies are reported to police we have a robust investigative response with the majority of investigations
being led by our locality CID under the supervision of an experienced Senior Investigating Officer.  This is reflected in
our detection rate of 90.5%, which is a 22.6% increase when compared with the same period last year.    
 There has been a significant increase in the number of serious assaults recorded during the reporting period with 22
additional crimes recorded when compared with the same period last year.  Analysis shows the majority of these
offences occur within Perth City with a number occurring within HMP Perth (10 crimes).  Drug and alcohol use feature
in almost a third of all incidents.
 We have a similarly robust investigative process for serious assaults and all such crimes are subject of a review by our
locality CID.  This is again reflected in our detection rate of 83.6% which is a 4.8% increase when compared with the
same period last year. 
In an attempt to prevent crimes of this nature occurring Police Scotland target known violent offenders.  This involves
executing apprehension warrants timeously relating to violent offenders and proactively conducting bail curfew checks
where appropriate. 
As outlined above, analysis shows that violence is often associated with the consumption of alcohol and we continue to
provide a policing presence in and around licensed premises.  In Perth City we continue to conduct joint patrols of “hot
spots” and licensed premises with partners including Community Safety Wardens and Street Pastors as part of Operations
STUNG and CENTRE SAFE. 
Page 34 of 232

Page 35

OFFICIAL 
10 | P a g e
OFFICIAL
To coordinate this activity we hold weekly meetings with colleagues in Community Safety to review incidents and inform
patrol activity and now also regularly conduct street briefings to increase visibility. 
In relation to violence within the Prison Estate, we have a dedicated Prison Liaison Officer (PLO) and close working
relationships with HMP Perth.  Our PLO and locality CID have carried out a number of successful operations to interdict
drugs and other items of contraband being introduced to the Prison estate in an attempt to prevent the violence and
disorder that such items can cause. 
Local Priority/Activity – Deal with disorder and antisocial behaviour
 Overall, incidents of Anti-Social Behaviour reduced by 3% when compared to LYTD and are 23% lower than the 5
year average.
 421 crimes of vandalism were recorded during the reporting period, an increase of 10% from LYTD (38 additional
crimes).
  14 crimes of fire raising were recorded during the reporting period, an increase of 27% when compared to LYTD (3
additional crimes). 
As outlined in our previous presentation to the Committee, Perth and Kinross officers work closely with local authorities,
Housing, ASB Teams, Trading Standards and Scottish Fire and Rescue Service to combat disorder and anti-social
behaviour. 
Daily reviews of all relevant ASB calls are shared in line with the Data Protection Act.  PIP officers hold monthly meetings
with partners to discuss all addresses linked to ASB. Officers conduct joint visits with partners to ensure all services are
working together and exploiting all available options and legislation. There are currently 44 ‘Target Addresses’ in Perth
and Kinross, 1 ASBO in place with a further 1 pending and 9 Acceptable Behaviour Agreements.
Page 35 of 232

Page 36

OFFICIAL 
11 | P a g e
OFFICIAL 
Any relevant, non-violent ASB incidents identified in public places, are brought to the attention of our local Community
Safety Wardens whereby their assistance is requested to carry out passing attention/foot patrols within an area, providing
reassurance to members of the public. 
Between 1st April 2023 and 30th September 2023, the divisional licensing team have processed 1633 licence applications
for the Perth and Kinross area. This included applications for occasional licenses to allow premises to have additional
outdoor areas, renewals for taxi operators and drivers, renewals and grants of House In Multiple Occupancy and
applications for grants of Short Terms lets in the lead up to the legislation commencement date of 1st October 2023.
93 recorded ASB incidents were at or in the immediate vicinity of licensed premises.
There has been no single premises identified as problematic. There were 360 inspections carried out throughout Perth and
Kinross.  
The licensing team have been promoting the ‘by-stander’ and `It I’ll Cost You’ training and campaign, and were assisted
by Police Scotland Youth Volunteers in carrying out public engagement within our communities and Premise Licence
Holders. The Licensing Team are continuing efforts to deliver training to licenced premises in respect of keeping people
safe in particular during the night time economy.
The No Knives Better Lives and Fearless (Crimestoppers for young people) products were shared with all secondary schools
in Perth and Kinross to support the prevention of violence and anti-social behaviour. 
Page 36 of 232

Page 37

OFFICIAL 
12 | P a g e
OFFICIAL
Local Priority/Activity – Tackle acquisitive crime and support victims
 There were 43 Housebreaking to Dwelling crimes recorded during the reporting period, which is a marginal
reduction of 1 crime from the same period last year.  
 23.3% of the crimes have been detected to date which is an improvement of 2.8% when compared to the same
period last year.  A number of the crimes recorded remain under active investigation and it is anticipated this figure
will increase as these investigations are brought to a conclusion.
 117 motor vehicle crimes were recorded during the reporting period. This includes theft and attempted theft of
vehicles, thefts from vehicles as well as break-ins and attempted break-ins. 
 Detection rates for vehicle crime are 15% lower than during the same period last year.  Analysis of crimes recorded
during the reporting period indicates that many of these crimes have been committed by offenders who have
travelled into Perth and Kinross from other areas of the country which is a change from the position last year when
a small number of local offenders were quickly identified and actively managed in the community while they
awaited trial.  Offences involving perpetrators from out with the local area can prove more challenging to
investigate, however as with theft by housebreaking a number of these crimes remain under active investigation
and it is hoped that the detection rate will improve as these investigations are brought to a conclusion. 
An Acquisitive crime team is now responsible for investigating crimes series under line management of CID. This
provides enhanced investigative ability and resources to address motor vehicle crime. This has been pivotal in
targeting a group of habitual criminals operating throughout the east of Scotland who repeatedly steal vehicles for
use in housebreakings during which true keys and further vehicles are stolen. The Acquisitive team meet every morning
with colleagues from neighbouring Divisions. This results in links to cross border crime series being identified quicker
maximising intelligence / evidential opportunities in relation to stolen vehicles/property providing a joined up
investigative approach. 
Police Scotland also targets those involved in acquisitive crime by executing apprehension warrants timeously and
proactively conducting bail curfew checks where appropriate.  We will also develop intelligence to crave and
execute search warrants to recover stolen property. 
Page 37 of 232

Page 38

OFFICIAL 
13 | P a g e
OFFICIAL 
Reported crimes of fraud continue to rise both locally and nationally, however the rate of increase in Perth and Kinross
is lower than that seen elsewhere in the Division and is also lower than the national average. 
Crimes of Theft by Shoplifting also continue to show a rise both locally and nationally with Perth and Kinross recording
a 3.9% increase when compared with the same period last year.  While this year on year rise may appear marginal we
are conscious of the impact crimes of these type have on the local economy and the wider impact caused by
associated anti-social behaviour.  The majority of incidents of theft by shoplifting occur in Perth City Centre and we
have increased our policing presence in the area with the reintroduction of named community police officers who
have been conducting both high visibility and plain clothes patrols and are working with local partners and
stakeholders via the Perth Business Safety Partnership to deter and disrupt offenders.  
Notable activities during the reporting period include: 
 17 year old male from Edinburgh arrested and charged with three incidents of Housebreaking and theft of 2 vehicles
from the Perth and Longforgan areas. 
 2 males, aged 23 and 17 from the Fife area arrested and charged with a theft by housebreaking to commercial
premises in Perth and the theft of a vehicle from the Kinross area.
 18 year old male from Edinburgh arrested and charged with theft by housebreaking and theft of vehicles in Perth
 31 year old male from Aberdeen arrested and charged with theft of a vehicle in Perth
 2 males, aged 18 and 20 arrested and charged with a theft by housebreaking and theft of 3 vehicles from the Coupar
Angus area.
 Crime Prevention inputs delivered to P&K minority groups including Centre for Inclusive Living, and dementia café. 
LPA/PIP have been working together with partners and local businesses to address offending within retail premises
including theft and ASB. 
Police collaborated with local authority partners during UCI Gran Fondo period and participated in cycle safety and
crime prevention events. 
Page 38 of 232

Page 39

OFFICIAL 
14 | P a g e
OFFICIAL
Local Priority/Activity – Make our roads safer 
Perth and Kinross suffered 2 fatalities in Q1 and the same in Q2.  There was an 8% decrease in the number of persons
seriously injured in Q1 and a 29% decrease in Q2.   
High visibility road safety enforcement continues to be routine business for the Road Policing Unit with a continued focus
on the Fatal 5, which has the greatest impact on casualty reduction and addresses community concerns. 
The New Drivers Scheme was delivered to pupils at Kinross High School. The input is delivered by Road Policing Officers in
partnership with the Scottish Fire and Rescue Service and targets hose aged 17-25 years of age who are statistically more
likely to be involved in a collision. The aim, to raise awareness of road safety and influence road user behaviour.   
Notable activities during the reporting period include:
 Joint presentation delivered to Housing and Wellbeing Committee by police and SFRS
 Motorcycle day of action A85, targeting motorcycles in relation to road safety.  
 Partnership working with the DVSA on the A90 targeting overweight vehicles and carrying out mechanical
examinations. 
 Joint patrols with community policing targeting anti-social driving Marshall Place, Perth 
 Intelligence led policing targeting drink and drug drivers across Perth and Kinross.
 Driver engagement on the A9 provided partnership working and meaningful engagement with foreign and older
drivers at House of Bruar. 
 Speed checks conducted across Perth and Kinross by our local Community Policing Teams and Divisional Roads
Policing Unit.
 Enforcement activity at School exclusion zones in response to concerns raised by members of local communities. 
Page 39 of 232

Page 40

OFFICIAL 
15 | P a g e
OFFICIAL
Local Priority Activity – Public Protection 
 25 rapes were recorded during the reporting period, which is a 19% reduction when compared to the same period
last year.  In all cases the victim and perpetrator were known to each other prior to the offence taking place.  
 We continue to see a significant number of reports which are categorised as “non-recent” in nature, i.e. the offence
was committed more than 12 months prior to the victim reporting to police.  Analysis shows that 44% of rapes
recorded during the reporting period fall into this category.
 Our detection rate for rape is significantly lower than LYTD, however this is due in part to the complex nature of
some of the investigations and it is anticipated that our performance in this area will improve as these investigations
are brought to a conclusion. 
As outlined during our joint presentation to the committee last month, Violence Against Women & Girls remains a priority
for Police Scotland and our strategy to tackle this issue has now been published.  Police Scotland engaged extensively
with survivors, stakeholders, partners and the public to develop this strategy which sets out a vision for Scotland where
women and girls live free from all forms of violence, abuse, exploitation, and harassment. 
Police Scotland’s approach to tackling domestic abuse is recognised as an exemplar world-wide, as is the perpetrator
focused approach to prevention epitomised in the ground-breaking That Guy campaign which ran for the second year
in November 2022 which urged men to be part of the solution, by promoting that having a quiet word with a friend at the
right time could stop sexual offending before it starts.  The campaign will run again in 2023, and although progress is being
made, there continues to be more work to do to support culture change and the rights of women and girls to feel safe. 
Page 40 of 232

Page 41

OFFICIAL 
16 | P a g e
OFFICIAL
Police Scotland’s strategy sets out 4 Strategic Outcomes to deliver change, these are; 
1. To supporting women and girls 
2. To prevent harm and secure justice 
3. To create safe spaces 
4. To uphold trust and confidence 
The following paragraphs will lay out our local approach to delivering on our national strategic intent.
Domestic Abuse Investigations
A critical component of the local delivery of our national strategic objectives relates to the quality and speed of our
investigations. Police Scotland see each report as a crucial opportunity to safeguard women and girls who have been
subject to violence.  This involves ensuring that each investigation is victim-centred, sympathetic to the needs of the
individual’s circumstances, holistic in the sense of exploring the full range of offences which may have been committed
and cognisant of the impact those offences may have had on other family members.  We understand the courage it
takes to report domestic abuse offences and seek to ensure we are accessible, responsive and robust.
Police Scotland maximise all investigative opportunities including the in depth analysis of offender behaviour,
understanding that perpetrators have often been abusive within the context of a range of previous and current
relationships.
Domestic Abuse investigations are subject to daily review by the Local Area Commander, ensuring that investigations are
progressed quickly, enforcement opportunities are maximised, offenders arrested quickly and all opportunities to prevent
further offending are explored.  This involves the use of both criminal and civil legislation, such as prohibitive bail conditions
and non-harassment orders.
Page 41 of 232

Page 42

OFFICIAL 
17 | P a g e
OFFICIAL
Every high risk victim and offender receive additional pro-active contacts to ensure safeguarding remains robust, women
and their families are safe and to ensure perpetrators are adhering to the conditions of court orders. 
Multi-Agency Tasking and Coordination (MATAC) 
Multi-Agency Tasking and Coordination (MATAC) meetings were introduced nationally by Police Scotland in 2013, in
accordance with Priority 4 of the Scottish Government Equally Safe strategy, which seeks to ensure perpetrators ‘receive
a robust and effective response’. 
The aim of MATAC is to effectively tackle offending by perpetrators who present the greatest risk of harm, in order to
achieve positive outcomes for victims and their families through coordinated partnership work to identify and investigate
domestic abuse perpetrators using relevant and legitimate police tactics. 
MATAC meetings take place in Tayside Division held every four weeks. 
During the reporting period 5 males from the Perth and Kinross Area were subject of active investigation as part of the
MATAC process.
Notable outcomes during the reporting period include:
 A 35 year old male from Perth was sentenced to 32 months imprisonment and was made subject of 15 year Non
Harassment Order.  The male offended against 2 partners and his offences included contraventions of the
Domestic Abuse (Scotland) Act, assault and abduction.
 A 36 year old male from Perth was sentenced to 6 years imprisonment and made subject of a Lifelong Restriction
Order.  The male offended against 4 partners between over a three year period and offences included assault,
abduction and sexual offences.
 A 52 year old male from Kinross was sentenced to 12 years imprisonment for offences against 2 partners which
occurred between 2008 and 2020.  Offences included numerous assaults, sexual offences and contraventions
of the Misuse of Drugs Act. 
Page 42 of 232

Page 43

OFFICIAL 
18 | P a g e
OFFICIAL
Multi-Agency Risk Assessment Conference (MARAC) 
MARAC is a local meeting where representatives from statutory and non-statutory agencies meet to discuss individuals at
high risk of serious harm or homicide as a result of domestic abuse. The meeting provides a safe environment for agencies
to share relevant and proportionate information about current risk and develop a coordinated action plan. 
The primary focus of the MARAC is to safeguard the adult victim. However, the MARAC will also make links with other
agencies to safeguard children and manage the behaviour of the perpetrator. Ensuring that the victim is supported
throughout, and their needs represented at the MARAC is crucial to managing risk, improving and maintaining safety,
and reducing repeat victimisation. 
MARAC meetings are held twice a month in Perth and Kinross in support of those who are most vulnerable to abuse and
violence. 
Disclosure Scheme for Domestic Abuse Scotland (DSDAS)
The aim of DSDAS is to provide a way of sharing information about a partner’s abusive past, with a potential victim. It gives
people at risk of Domestic Abuse the information they need to allow them to make an informed decision whether to
continue the relationship.
The Disclosure Scheme for Domestic Abuse Scotland has two main triggers for disclosure, the Right to Ask and the Power
to Tell.
Right to Ask - is open to anyone who has concerns about a new partner’s abusive past or has concerns about another
person’s new partner. An example of this would be a parent concerned about their child’s new partner.
Power to Tell - enables Police to make a public interest disclosure when we receive information or intelligence about a
relationship/developing relationship which may otherwise leave a person at avoidable risk of harm from a violent partner.
Anyone can make a DSDAS application via the Police Scotland internet page.   
Page 43 of 232

Page 44

OFFICIAL 
19 | P a g e
OFFICIAL
Education of Young People
Within Education in Perth & Kinross, our Preventions Interventions and Preventions (PIP) are actively involved with a number
of national and local programmes addressing violence and crime prevention.  This includes the prevention of domestic
abuse and gender based violence and supporting survivors of abuse. Of note this has included collaborative work with
RASAC around Mentors in Violence Prevention and the development of a future positive masculinity young men’s group
within Perth & Kinross.
A PIP officer forms part of the Mentors in Violence (MVP) Program Perth & Kinross steering group as well as being a national
staff training instructor for schools and partners and a young person trainer. MVP is a national program operated by
Education Scotland which creates mentors from S5 and S6 pupils from the secondary schools around domestic abuse,
gender based violence and bystander. In turn, they facilitate classes to S1 and S2 pupils, effectively being positive role
models within the schools. The Perth & Kinross MVP steering group, attended by Perth & Kinross Council, Education and
Police Scotland, met during this quarter and planned staff training sessions took place involving staff and partner agencies
from Breadalbane Academy, Kinross HS, The Community School of Auchterarder, CLD and RASAC. Pupil training sessions
also took place at Perth Academy, St Johns Academy, and Crieff HS.
Imagine a man was developed by Youthlink nationally to encourage young men to think about positive masculinity to
reduce the instances of men’s violence, gender based violence and violence against women. The product looked at
mental health, alcohol and drugs and negative stereotypes. This resource has been shared with all secondary schools in
Perth and Kinross. 
Page 44 of 232

Page 45

OFFICIAL 
20 | P a g e
OFFICIAL
Local Priority/Activity – Enable and support effective engagement and communication with the public 
Ease of contact is a key area of focus in our Public Contact and Engagement Strategy. The introduction of accessible
new contact channels and enhancement of how Police Scotland communicates and engages, will help to improve
public experience and confidence in reporting crime and other incidents, enabled by digital services. For example, key
programmes are continuing to ensure people are able to contact police in ways which are most accessible for individuals. 
Responses to our Your Police and User Experience surveys are reviewed regularly by our Executive and service leads and
have helped us act quickly in relation to emerging issues and community concerns. 
Your Police is open all year and is available for anyone to complete at any time to provide feedback to their local police
service. It is fully accessible on our online Engagement Hub which meets legislative standards for accessibility and is
compatible with browser translation. It is available in British Sign Language and alternative languages and formats on
request. We have gathered around 100,000 responses to this survey since its launch in 2019. Responses help shape policing
in local areas. The User Experience Survey is sent to a sample of around 14,000 people each month who have contacted
the police. An invitation to participate in the survey is sent via text message. The sample is made up of a representative
number of people who have contacted the police to report crime (calls, online reporting, email, face to face) from all
areas in Scotland over the previous month. Around 1,800 people respond each month to share their feedback on the
quality of the service they received.  
Key activities have included: 
 Work is underway to fully develop regular data insights for local policing divisions from the survey data to highlight
areas of lower engagement and locations where people have said they feel less safe. 
 Keeping local community partners engaged and involved on a regular basis, using the data to design an
appropriate policing response for local needs and providing a multi-agency response to cross sector themes.
 Shaping our communications and advice nationally and in local areas in response to concerns and feedback from
the public – helping people stay safe. We are currently developing a suite of new resources to respond to feedback
from our seldom-heard communities research programme to ensure information is available, relevant and accessible
Page 45 of 232

Page 46

OFFICIAL 
21 | P a g e
OFFICIAL
for all communities. We are taking forward conversations with local partners and communities in Dundee, Glasgow
and Aberdeenshire to co-design these resources together.
 Providing information and advice on issues we know are concerning people right now, like hate crime through our
new #DontFeedHate campaign. 
We have also recently launched a feedback form for people who have experienced domestic abuse, rape or other
sexual crime to provide feedback on their experience and interactions with the Service. This is the first of its kind for Police
Scotland and is the result of a collaborative approach between Public Protection and Strategy, Insight and Engagement.
The feedback form will ensure we are continuing to monitor the service we provide to victim-survivors, improvidng our
ability to understand our progress towards achieving the outcomes we have set out in our Violence against Women and
Girls Strategy. 
During the reporting period local officers have been promoting the following through social media: 
 Promotion of National Carers Week
 National Seatbelt Campaign
 Pride Month
 Crime Prevention Patrols in Perth City Centre
 Enforcement of School Exclusion Zones across Perth and Kinross
 Speed check activity in LPAs with local officers
 Motorcycle safety
 Trusted Trader
 Fearless Safer Summer with PSYV 
Page 46 of 232

Page 47

OFFICIAL 
22 | P a g e
OFFICIAL
National Priority – Use innovative approaches to accelerate capacity and capability for effective
service delivery 
Your Leadership Matters Core Programme (YLM) is a virtual first programme designed to enhance leadership behaviours,
through a blend of summits on MS Teams virtual platform, combined with guest speakers and elements of digital learning,
to equip our leaders with the support, capability and skills needed to lead, in a manner that is aligned to our Competency
and Values Framework, and to the three leadership behaviours that have been defined as part of the programme.
1. Lead and Learn Inclusively
2. Have the Courage to do the Right Thing
3. Collaborate for Growth
Page 47 of 232

Page 48

OFFICIAL 
23 | P a g e
OFFICIAL 
Police Scotland has evolved as an organisation both internally and in response to the current external challenges that we
face in policing the communities of Scotland. Our ambition for our people, and their professional experience have also
grown, as a reflection of how society has changed over almost a decade.
Leading and learning inclusively is the consistent thread that runs through everything that we do. We are building inclusive
teams with diverse perspectives to proactively strengthen decisions and solutions. It is vital that we equip our leaders with
the support, capability and skills they need to be able to lead, in a manner that is aligned to Police Scotland’s
Competency and Values Framework, and to the three leadership behaviours that have been defined the Your Leadership
Matters program (YLM).
Page 48 of 232

Page 49

OFFICIAL 
24 | P a g e
OFFICIAL
National Priority – Prioritise wellbeing and keep our people safe, well equipped and protected
Officer Safety Training
Following extensive review, Operational Safety and First Aid Recertification Training have been fully reviewed and
updated.
The course was developed as part of the Your Safety Matters initiative and follows the Chief Constable’s Assault Pledge
to give officers and staff the tools and training needed to stay safe. Officer Safety Training has been extended to a two
day annual course designed for all officers from the rank of Constable to Chief Inspector and certain members of police
staff. 
It is delivered at venues across the country by staff from the newly created National OST Unit.
The new two day course includes refresher training of Operational Safety theory and techniques including: 
Practical first aid inputs introducing the use of Automatic External Defibrillators (AEDs); Compression bandages; Inputs on
situational awareness and de-escalation alongside the introduction of new operational safety techniques. 
Mobile Working
Police Scotland commenced a program of introducing new mobile devices in 2019, designed to provide officers with
access to a range of Police databases and additional communication functionality, limiting officer’s time behind desks
and maximising visibility within local communities.
This technological advance ensures officers have instant access to detailed information, including warning markers to
help keep them safe, through smart devices which incorporate radio communication, mobile telephony and online
access.
Recently, some 12,400 new devices with enhanced functionality have been rolled out across the country, with a focus on
prioritising those engaged in front line policing.
Page 49 of 232

Page 50

OFFICIAL 
25 | P a g e
OFFICIAL
Senior Leadership Engagement
During August and September 2023, Tayside’s Senior Leadership Team hosted 14 staff engagement sessions with staff
across the division.  This was an opportunity to bring officers and staff together to hear about key activities ongoing both
divisionally and nationally and to enable staff to pose questions and engage directly with members of the leadership
team.  
The events were well attended with a significant commitment and enthusiasm evident from all staff.  The learning and
ideas generated from these sessions are being developed into an Action Plan to drive forward in a way which best
supports the public and our people. These sessions will be repeated at 6-monthly intervals. 
Page 50 of 232

Page 51

PERTH AND KINROSS COUNCIL 
Housing & Social Wellbeing Committee 
29 November 2023 
STRATEGIC HOUSING INVESTMENT PLAN 2024/25 – 2028/29
.
Report by Strategic Lead, Economy, Development and Planning
(Report No. 23/336) 
1. PURPOSE 
1.1 To seek approval of the Strategic Housing Investment Plan (SHIP) 2024/25 –
2028/29. (Appendix 1). 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
(i) approves the content of the Strategic Housing Investment Plan 2024/25
– 2028/29. 
(ii) approves the ongoing development of the SHIP and gives delegated
authority to the Strategic Affordable Housing Board to ensure that where
projects fall out of the plan, alternative projects, prioritised in the same
way are substituted for them. 
(iii) notes that the SHIP has been submitted in draft to the Scottish
Government as detailed in paragraph 5. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 The context for the SHIP is:
• National
o Housing to 2040 which sets out the Scottish Government’s
vision and strategy for housing. 
5
Page 51 of 232

Page 52

• Local 
o The approved Local Outcomes Improvement Plan and
Corporate Plan, which set priorities for the Council and its
partners and identify the importance of delivering new affordable
homes to meeting those priorities.
o The Council’s new Local Housing Strategy (LHS), which was
recently approved at the Housing & Social Wellbeing Committee
on 15 March 2023. 
4.2  The SHIP sets out the strategic investment priorities for affordable housing
over a five-year period to achieve the strategic vision set out within the Local
Housing Strategy (LHS) to ‘provide more homes at the heart of great places’. 
4.3 The SHIP sits alongside the LHS as one of its core delivery mechanisms. It 
has been developed through engagement with community members, 
relevant Council services, the Health and Social Care Partnership,   
developers and five main housing associations in the Perth & Kinross area: 
• Hillcrest Housing Association
• Kingdom Housing Association
• Places for People
• Caledonia Housing Association
• Ark Housing Association 
4.4  The Council prepares the SHIP annually in its role as Strategic Housing
Authority. It ensures that the Council, and its partners, deliver housing that
meets the needs of the community, reflecting and aligning with outcomes and
housing policies as set out in our LHS. 
4.5  The SHIP informs the Scottish Government of our planned affordable housing
programme for the preparation of a Strategic Local Programme Agreement. 
4.6  The Council and its RSL partners remain ambitious in our plans to increase
the supply of affordable housing across all Housing Market Areas (HMAs)
(Appendix 2) of Perth and Kinross. These plans are linked to housing need,
including those with particular support needs, in each HMA. 
4.7 In March 2021, the Scottish Government published Scotland's first ever long-
term national housing strategy. The Housing to 2040 strategy sets out the
Scottish Government’s vision that ‘everyone to have a safe, energy efficient
home that is affordable and meets their needs in the place where they want to
be’. The strategy is based on the principles of social justice, equality and
human rights and includes a target to deliver 100,000 affordable homes in 10
years to 2031-32, with 70,000 of these for social rent. This will be delivered
through a range of measures including: 
• the Housing and Planning Delivery Framework which reinforces the links
between planning and housing requirements to support the provision of
the right homes in the right places to create and sustain thriving
communities.
Page 52 of 232

Page 53

• the Local Housing Strategies which underpins the strong alignment
between housing and planning to support new and existing
neighbourhoods based on place-making principles to promote housing’s
role in the building of successful and sustainable places.
• the Affordable Housing Supply Programme.
• innovative funding models.
• making best use of existing homes and bringing empty homes back into
use.
• Gypsy/Traveller Sites. 
4.8 For the SHIP period 2023/24 to 2027/28, the Council has estimated that the
Resource Planning Assumption (RPA) funding, as detailed in Table 1,
amounting to £83.995m, will be available from the Scottish Government to
assist in the delivery of new affordable homes within all HMAs of Perth and
Kinross. 
Table 1 – estimated breakdown of RPA Funding 
Financial
Year
2023/24 2024/25 2025/26 2026/27* 2027/28* TOTAL
RPA
(£Millions)
£16.587 £16.645 £16.921 £16.921 £16.921 £83.995 
*Note RPA funding is only known until 2025/26. Scottish Government
Guidance is to use 25/26 amount for future years until announced.       
4.9 The Council aims to increase the scale and pace of delivery of affordable
housing over the next five years, by continuing the partnership approach to
maintain, and exceed, the delivery of affordable housing, as seen throughout
the previous 5-year period. Both the Council and its RSL partners new build
plans include both mainstream housing and housing suitable for particular
support needs. It is acknowledged that the latter are more expensive to
deliver, as they often provide bespoke accommodation to meet the needs of
the individual or family. 
4.10 Affordable housing within the SHIP includes new build projects,
refurbishment, and renovation projects, off the shelf acquisitions and
buybacks which is delivered in following tenure types to meet local needs: 
• Social Rent
• Mid Market Rent
• Shared Equity
• Self Build Plots
The Scottish Government will use this information to draft a Strategic Local
Programme (SLP) Agreement which, once agreed, will form the basis of the
Council and our Partner Programme Agreements. 
Page 53 of 232

Page 54

4.11 All projects identified as priorities for funding over the 5-year period are
identified within Appendix 1. They have been input via the Scottish
Government’s Housing and Regeneration Programme (HARP) system. 
4.12 Since 2016/17, the Council and its partners have delivered 1919 affordable
homes in all Housing Market Areas of Perth and Kinross, averaging 274
affordable homes per year against our LHS target of 210.  This was an
increase from the previous LHS target of 150. During the 2022/23 financial
year, the Council and its partners delivered 167 new build affordable homes
and 36 buy backs.  In total, 203 new homes were completed which was a
significant achievement for the Council and our partners, given local and
global factors affecting build costs and construction capacity.   
4.13 Although the Council and its partners are making progress on projects, it
remains a challenging operating environment, as a result of factors such as
high cost, labour issues, time implications as well as land availability and site
suitability. 
4.14 The global supply chain for sourcing materials has continued to be
significantly affected, which has resulted in a shortage of raw materials and
increased market demand. Overall, the Council and its partners are faced with
rising costs driven by increasing material costs, pressure within the labour
market and increased demand within the construction sector. As a result of
these factors, tender prices have increased over the past 12 months on
average between 16% to 20%. It is anticipated that this trend of tender price
increases will extend into 2024. The Scottish Government More Homes
Division are fully aware of the current issues. To help mitigate the increased
costs, they have advised that additional grant monies can be considered on a
project by project basis for abnormal costs to address site specific constraints. 
5. PROPOSALS  
5.1 The SHIP 2024/25 – 2028/29 seeks to build on the success of the previous
SHIP period. It continues with investment for affordable housing, which is
focused on the long-term regulatory changes around building safety, Housing
to 2040, Energy Efficiency Standard for Scottish Housing (EESSH) 2 and net
zero and decarbonisation efforts.
5.2 Despite the local and global challenge, the Council will continue to develop
affordable housing across brownfield sites within Perth and Kinross.
Brownfield sites are ‘land which has previously been developed on, which is
or was occupied by a permanent structure.’  The Council and its partners
recognise the challenges when developing on brownfield sites, which often
result in costs that are potentially higher to develop in comparison to
greenfield sites. The new LHS Action Plan seeks to maximise the potential to
generate more homes through brownfield sites. A register of potential
brownfield sites that would be suitable as housing subject to change of use
will be established, with a PKC target of delivery of 50% affordable homes
through brownfield regeneration and change of use for vacant properties by
2027.   
Page 54 of 232

Page 55

5.3  The SHIP estimates that almost 1688 affordable homes could be delivered
during the period 2024/25 – 2028/29 by the Council and its partners, utilising
the Scottish Government subsidy of circa £83.995m. The Scottish
Government confirmed the Council’s Five-year Resource Planning
Assumption (RPA) for the period 2021/22 to 2025/26 during July 2021. The
2026/27 and 2027/28 Financial Year RPA have mirrored the allocations of the
2025/26 Financial Year until future RPA is announced – See Table 1 in
section 4.8 above.   
5.4 To promote the delivery of the 2024/25 – 2028/29 SHIP, the Council
continues its partnership approach with the Scottish Government, RSLs and
the private sector to explore all possible affordable housing options that will
help maximise the delivery programme. The successful development and
implementation of the SHIP relies on close collaboration between the Council,
Scottish Government and individual RSLs. These relationships remain strong
in Perth & Kinross, with all stakeholders committed to working together to
deliver the projects within the SHIP and to overcoming any challenges or
constraints. We continue to maintain the increased levels of routine
communication with regular meetings in the form of the Strategic Housing
Providers Forum.  This includes senior representatives of the five main
housing associations currently operating new build programmes in Perth &
Kinross. 
5.5 Through the Council’s successful partnership, Table 2 demonstrates a
significant number of affordable homes that are currently on site or due to
start on site during the 2024/25 Financial Year. This achievement is the result
of the strong SHIP partnership arrangement outlined above. 
Table 2: Affordable Housing Developments currently on site or due to start
during 2024/25 Financial Year
Development
Name  HMA  Tenure  Amount of Affordable
Homes 
Buybacks  Various  Social Rent  30
Grewar Farm,
Coupar Angus  Strathmore  Social Rent  42
Former Balhousie
School, Perth  Perth  Social Rent/Mid
Market Rent  40
Former
Beechgrove
Residential Home,
Perth 
Perth  Social Rent  40
East of St Cedd’s
Road, Ballinluig  Highland  Social Rent  16
H31 Stanley  Perth  Social Rent  18
Page 55 of 232

Page 56

Moyness,
Blairgowrie 
Strathmore
& Glens  Mix  36
Forfar Road,
Meigle  Strathearn  Mix  36
Broich Road Phase
3, Crieff  Strathearn  Mix  18
Hatton Road,
Rattray 
Strathmore
& Glens  Mix  42
Duntaylor Avenue,
Aberfeldy  Highland  Mix  45
Oudenarde Site  Perth  Mix  41
Westpark Phase 1,
Blairgowrie 
Strathmore
& Glens  Mix  73
Scone North  Perth  Mix  60
Bertha Park Phase
4B, Perth   Perth  Mix  18
Almond Valley
Phase 1, Perth  Perth   Mix  85
Hawarden Terrace,
Perth   Perth   Social Rent  18
Broich Road, Crieff  Strathearn  Mix  55      
713 
Notes: SR - Social Rent, MMR - Mid-Market Rent, Mix - combination of
owner-occupier housing, shared ownership housing and social rental
properties 
5.6 Approval of the SHIP 2024/25 – 2028/29 will ensure that the Council
continues to successfully deliver a range of affordable housing tenure options
for those in housing need within Perth and Kinross that will positively
contribute towards the following outcomes of the LHS by: 
• providing more homes at the heart of great places
• providing a range of housing options that people can easily access,
afford, and keep
• delivering housing for people with varying needs
• delivering quality homes with affordable warmth, zero emission and
SMART technology. 
5.7 The Council has submitted its SHIP to the Scottish Government via its HARP
system on 27 October 2023. The document has been issued to the Scottish
Government on the basis that it is subject to Committee approval and any
changes required will be reported to the Scottish Government. Following
Page 56 of 232

Page 57

approval, the SHIP will form the basis of the Strategic Local Programme
Agreement with the Scottish Government. 
5.8 The attached (PKC SHIP 24-29) document (Appendix 3) provides an overview
of the SHIP 2024 – 2029 that will be included via the Perth and Kinross
Council Website. 
6. CONCLUSION   
6.1 This report outlines the Perth and Kinross Strategic Housing Investment Plan
2024/25 – 2028/29 (Appendix 1). 
Author
Name  Designation Contact Details
Kevin Divin Housing Strategy (01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton Executive Director
(Communities)
21 November 2023
APPENDICES 
• Appendix 1 – Strategic Housing Investment Plan 2024/25 – 2028/29
• Appendix 2 – Housing Market Areas.
• Appendix 3 – PKC SHIP 24-29 (website information) 
Page 57 of 232

Page 58

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  YES
Corporate Plan  YES
Resource Implications  
Financial  YES
Workforce No
Asset Management (land, property, IST) YES
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  None 
The Impact & Value Assessment (IVA) has been designed to screen every 
Council project, strategy or proposal against statutory and non-statutory 
environmental, social and economic requirements. It has replaced the 
previous existing Integrated Appraisal Toolkit (IAT). 
SHIP Impact & Value Assessment Report 
1. Strategic Implications 
Community Plan/Single Outcome Agreement 
1.1 This report supports the following priorities within the Perth and Kinross
Community Plan 2022-27: 
1. Reducing Poverty
2. Physical and Mental Wellbeing 
Corporate Plan 
1.2 This report supports the objectives of the Corporate Plan 2022/23 to 2027/28: 
(i) Children and young people grow up safe, respected, well-educated,
and confident in their ability to realise their full potential;
Page 58 of 232

Page 59

(ii) People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities
for all; 
(iii) People can achieve their best physical and mental health and have
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 Resource implications arising directly from this report emanate from the
proposed local authority new build housing programme (as detailed in the
SHIP appended). In addition to the Scottish Government Grant, the second
home Council Tax fund and developer’s contributions for affordable housing
will be used to support the delivery of the programme including prudential
borrowing. Detailed resource assumptions on the use of these funds will be
reported to respective Council Committees when final details are known. 
2.2  The Team Leader, Finance and Governance was consulted on these
proposals as part of the Capital Budget and HRA Capital Plan budget setting
process. 
Workforce 
1.3 There are no direct workforce implications regarding this report. 
Asset Management (land, property, IT) 
1.4 Some of the sites identified via the SHIP 2024/25 – 2028/29 are in ownership
of the Housing Revenue Account and the General Fund. Discussions are
ongoing with various departments regarding potential valuations, transfers to
the Housing Revenue Account for the delivery of affordable housing. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allow the Council to demonstrate that it is meeting these duties. 
3.2 This report has been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
Page 59 of 232

Page 60

(i) Assessed as not relevant for the purposes of EqIA.
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. A Pre Screening Report has been provided to SEA Gateway.
Having consulted the three consultation authorities and having considered the
criteria set out in the Act, the Council considers that the Strategic Housing
Investment Plan 2024/25 – 2028/29 is unlikely to have significant
environmental effects. The relevant policy has been subject to assessment
through the SEA of the Local Development Plan 2 (2019) so significant
environmental effects as a result of the guidance that have not already been
assessed elsewhere are unlikely. The Council has therefore determined that
SEA is not required. 
SHIP SEA Screening 
Sustainability   
3.4 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets.
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.5 The information contained within this report has been considered under the
Act. However, no action is required as the act does not apply to the matters
presented in this report. 
Legal and Governance 
3.6      Not applicable. 
Risk 
3.7 Not applicable. 
4. Consultation 
Internal 
Page 60 of 232

Page 61

4.1 Heads of Service and senior managers from Housing, and Planning have 
been consulted on the content of this report. 
• Planning
• Education
• Health and Social Care Partnership
• Housing
• Estates
• Economic Development
• Occupational Health
• Finance 
• Asset Management 
External 
4.2 Consultation via various organisations progressed through external meetings
from May 2023 – September 2023 with the following: - 
• Scottish Government
• Scottish Water
• Housing Developers
• Registered Social Landlord Partners 
2. BACKGROUND PAPERS 
2.1 The following background papers were used to inform this report: 
• Scottish Government – Guidance on preparing Strategic Housing 
Investment Plans: Guidance Note MHDGN 2023/02  Supporting documents -
Strategic Housing Investment Plan (SHIP) guidance note MHDGN 2023/02 - gov.scot
(www.gov.scot)
• Scottish Government - Affordable Housing Supply Programme: Process and
Procedures MHDGN 2023/01  Funding applications and appraisal procedures -
Affordable Housing Supply Programme (AHSP): process and procedures MHDGN 2023/01 -
gov.scot (www.gov.scot)  
Page 61 of 232

Page 62

Page 62 of 232

Page 63

APPENDIX 1 - Strategic Housing Investment Plan (2024/25 – 2028/29)
Affordable Housing Site Starts (2024/25 –
2028/29)     
PROVIDER 24/25 25/26 26/27 27/28 28/29 Total AH
PKC 152 174 135 105 72 638
KHA 90 16 54 58 0 218
HH 128 102 0 0 0 230
CHA 34 46 16 0 0 96
PfP 236 31 0 0 0 267
Ark 18 0 41 0 0 59
TBD 55 0 0 0 125 180
Total Site Starts 713 369 246 163 197 1688 
Affordable Housing Completions (2024/25 –
2028/29)     
PROVIDER 24/25 25/26 26/27 27/28 28/29 Total AH
PKC 82 150 121 135 75 563
KHA 149 53 28 40 14 284
HH 101 87 40 36 0 264
CHA 17 41 42 8 0 108
PfP 124 105 44 0 0 273
Ark 18 0 10 20 21 69
TBD 25 35 0 0 40 100
Total Completions 516 471 285 239 150 1661 
ARK – Ark Housing Association, Caledonia Housing Association, HH – Hillcrest Homes, KHA – Kingdom Housing Association, PKCHS – Perth & Kinross
Council Housing Service, PfP –  Places for People, TBD – To be Determined
5
Page 63 of 232

Page 64

Pre 2024/25 Site starts with Completions
in 2024/25+       
Project Address HMA Provider Total New
Homes Site Start Pre 24/25 Completions
24/25
Completions
25/26
Completions
26/27
Hayfield Brae, Lynedoch
Road, Methven  Perth PKC 12 12 12 0 0
Bertha Park Phase 3,
Perth Perth KHA 41 41 41 0 0
Lathro Farm, Kinross Kinross KHA 35 35 35 0 0
Broich Road Phase 4,
Crieff Strathearn KHA 12 12 12 0 0
Milnathort, Kinross  Kinross KHA 16 16 16 0 0
Abbeyfield, Crieff  Strathearn HH 9 9 9 0 0
Wester Tomaknock, Crieff Strathearn HH 25 25 25 0 0
Bertha Park Phase 4A,
Perth Perth  PfP 16 16 16 0 0      
166 166 166 0 0 
Page 64 of 232

Page 65

2024/25 Site Starts with Completions 24/25+       
Project Address HMA Provider
Total
New
Homes
Site Start
24/25 Completions 24/25 Completions 25/26 Completions
26/27
Buybacks Various PKC 30 30 30 0 0
Grewar Farm, Coupar
Angus Strathmore PKC 42 42 0 42 0
Former Balhousie
School, Perth Perth  PKC 40 40 20 20 0
Former Beechgrove
Residential Home,
Perth 
Perth  PKC 40 40 20 20 0
East of St Cedd’s
Road, Ballinluig Highland CHA 16 16 8 8 0
H31 Stanley  Perth  CHA  18 18 9 9 0
Moyness, Blairgowrie Strathmore & Glens KHA 36 36 18 18 0
Forfar Road, Meigle Strathearn KHA  36 36 18 18 0
Broich Road Phase 3,
Crieff Strathearn KHA 18 18 9 9 0
Page 65 of 232

Page 66

Hatton Road, Rattray Strathmore & Glens HH 42 42 21 21 0
Duntaylor Avenue,
Aberfeldy Highland HH 45 45 25 20 0
Oudenarde Site Perth HH 41 41 21 20 0
Westpark Phase 1,
Blairgowrie Strathmore & Glens PfP 73 73 30 30 13
Scone North Perth PfP 60 60 30 30 0
Bertha Park Phase 4B,
Perth  Perth PfP 18 18 18 0 0
Almond Valley Phase
1, Perth Perth  PfP 85 85 30 30 25
Hawarden Terrace,
Perth  Perth  Ark  18  18  18  0  0 
Broich Road, Crieff Strathearn TBD 55 55 25 35 0      
695 695 332 330 38           
Page 66 of 232

Page 67

2025/26 Site Starts with Completions
2025/26+       
Project Address HMA Provider
Total
New
Homes
Site Start 25/26 Completions 25/26 Completions 26/27 Completions 27/28
Buybacks Various PKC 30 30 30 0 0
Atholl Road/Elm Court,
Pitlochry Highland PKC 18 18 8 10 0
Former Hillside Hospital,
Perth  Perth  PKC/HH 70 70 20 25 25
Thimblerow, Perth  Perth  PKC/HH 60 60 10 25 25
Borlick Phase 1,
Aberfeldy Highland PKC 35 35 10 15 10
Haugh Road, Blairgowrie Strathmore &
Glens CHA 30 30 15 15 0
Former Co-op &
Adjacent Site, Perth  Perth  CHA 16 16 8 8 0
H30 Stanley Perth  KHA 16 16 8 8 0
Strathmore Terrace,
Alyth
Strathmore &
Glens HH/PKC 51 51 10 20 21
Moncur Road, Inchture Perth HH 12 12 6 6 0
Westpark Phase 2A,
Blairgowrie
Strathmore &
Glens PfP 31 31 15 16 0      
369 369 140 148 81 
Page 67 of 232

Page 68

2026/27 Site Starts with Completions
2026/27+       
Project Address HMA Provider
Total
New
Homes
Site Start 26/27 Completions 26/27 Completions 27/28 Completions 28/29
Buybacks Various PKC 30 30 30 0 0
St Catherines Square,
Perth Perth PKC 30 30 10 20 0
Borlick Phase 2,
Aberfeldy Highland PKC 35 35 10 10 15
Rossie Place (Ph 1 & 2),
Auchterarder Strathearn PKC 40 40 10 10 20
Former Co-op &
Adjacent Site, Perth  Perth  CHA 16 16 8 8 0
Bertha Park Phase 4C,
Perth Perth KHA 54 54 20 20 14
Westpark Phase 2B Strathmore
& Glens Ark 41 41 10 20 21      
246 246 98 88 70 
Page 68 of 232

Page 69

2027/28 Site Starts with
Completions 2027/28+                
Project
Address HMA Provider Total New Homes Site Start 27/28 Completions 27/28 Completions 28/29 Completions 29/30
Buybacks Various PKC 30 30 30 0 0
Rossie Place
(Ph 3 & 4),
Auchterarder
Perth  PKC 40 40 10 10 20
Perth West Perth PKC 35 35 10 10 15
Bertha Park,
Perth (Ph5) Perth KHA 58 58 20 20 18      
163 163 70 40 53 
Page 69 of 232

Page 70

2028/29 Site Starts with
Completions 2028/29+                
Project
Address  HMA Developer  Total
Units  Site Start 28/29  Completions 28/29  Completions 29/30  Completions 30/31 
Buybacks  Various  PKC  30 30 30 0  0 
Stanley H30
(Ph2)  Perth  PKC  22 22 0  22 0 
Perth West Perth TBD 65 65 20 20 25
Bertha Park,
Perth (Ph6) Perth TBD 60 60 20 20 20
Rossie Place
(Ph 5),
Auchterarder
Perth PKC  20 20 10 10 0      
197 197 80 72 45 
Page 70 of 232

Page 71

Appendix 2 – Strategic Housing Investment Plan 2024/25 – 2028/29
Perth and Kinross Housing Market Areas (HMAs)
HMA PKC Settlements
Greater Perth Abernethy, Abernyte, Almond bank, Balbeggie, Bankfoot, Bridge of Earn,
Dunning, Errol, Forgandenny, Glencarse, Glenfarg, Guildtown, Inchture,
Invergowrie, Longforgan, Luncarty, Methven, Murthly, Perth, Scone,
Stanley, St Madoes, Wolfhill
Highland Aberfeldy, Ballinluis, Blair Atholl, Dunkeld, Fearnan, Kenmore, Kinloch
Rannoch, Pitlochry
Kinross Blairingone. Crook of Devon, Glendevon, Keltybridge, Kinnesswood, Kinross,
Milnothort, Powmill, Scotlandwell
Strathearn Aberuthven, Auchterarder, Blackford, Bract, Comrie, Crieff. Gilmerton,
Gleneagles, Greenloaning, Muthill, St Fillans
Strathmore Alyth, Ardler, Blairgowrie, Bridge of Cally, Burrelton, Caputh, Coupar Angus.,
Kettins, Kirkmichael, Meigle, Meikleour, New Alyth, Spittalfield, Eastern
Perthshire, Woodside 
5
Page 71 of 232

Page 72

Page 72 of 232

Page 73

Perth and Kinross Council
Strategic Housing 
Investment Plan
2024/25 – 2028/29
‘Everyone in Perth and Kinross has access to the right home, in
the right place and at the right cost”
October 2023
5
Page 73 of 232

Page 74

1. Introduction
1.1 Good quality homes in well-designed places make a significant
contribution to Perth and Kinross Council’s (PKCs) wider aims of creating
safe and sustainable communities where people aspire to live. 
1.2    The Strategic Housing Investment Plan (SHIP) 2024/25 – 2028/29
outlines investment priorities for affordable housing which will support
delivery of the outcomes that are set out through our Local Housing
Strategy (LHS) with the following 4 new strategic priorities: 
Priority 1 – Providing more affordable homes to support liveable and 
sustainable communities; 
Priority 2 – Providing a range of housing options that people can easily 
access, afford and keep; 
Priority 3 – Delivering housing for people with varying needs; 
Priority 4 – Delivering quality homes with affordable warmth, zero 
emission and SMART technology. 
1.3 Good quality affordable homes can have a positive impact on quality of
life. With demand for housing in Perth and Kinross continuing, and the
housing needs of our communities becoming increasingly complex, our
commitment to providing a range of affordable housing options remains a
key strategic priority. We remain committed to building more homes and
overseeing a long-term programme of new affordable housing
development to meet local needs and to support the Scottish
Government’s Housing to 2040 strategy. 
1.4 The SHIP 2024/25 – 2028/29 proposes to deliver 1490 affordable homes
over the next 5-year period. This confirms our commitment to continue
with the scale, pace of delivery, and exceed with our new LHS 2022 - 2027
target of 210 affordable homes per year.
1.5 The SHIP has been developed in partnership with Community members,
Registered Social Landlords (RSLs), the Health and Social Care
Partnership, the Planning Service, and the Housing Service.
1.6 The SHIP is designed to be a working tool which:
 improves longer-term strategic planning
 provides a practical plan detailing how investment in affordable
housing will be directed
 provides an opportunity for the Council to set out key investment
priorities for affordable housing and demonstrates how these will
be delivered and the resources which will help deliver these
priorities
 forms the basis for more detailed programme planning
 provides a focus for partnership working
 informs, and is informed by, the preparation of Registered Social
Landlord (RSL) development funding plans
Page 74 of 232

Page 75

 informs the allocation of resources from a national to a local
authority level.
1.7  Confirmation of our Resource Planning Assumption (RPA) was
announced during July 2021 by the Scottish Government which covered
the period 2021/22 – 2025/26. For the Financial Years 2026/27 – 2027/28,
the 2025/26 RPA has been used in line with Scottish Government
Guidance until further announcements are made. 
Table 1
Financial
Year 
2023/24  2024/25  2025/26  2026/27*  2027/28*  TOTAL 
RPA
(£Millions) 
£16.587  £16.645  £16.921  £16.921  £16.921  £83.995 
*More Homes Division Guidance Note 2020/02 only covers a 3-year
period. 
1.8 The Council will continue to increase the scale and pace of delivery of
affordable housing over the next five years through an estimated RPA of
circa £83.995m as highlighted in Table 1. 
1.9  All projects identified as priorities for funding and delivery over the 5-year
period are identified in Appendix 1. All projects are recorded through the
Scottish Government’s Housing and Regeneration Programme (HARP)
system.
1.10  Projects included within the SHIP as affordable housing will be delivered
through new build, buybacks, regeneration, renovation, and re-modelling.
The Scottish Government will use this information to draft a Strategic Local
Programme (SLP) Agreement. Once agreed, the SLP will form the basis
of the Council’s and our partner RSL Programme Agreements. It should
be noted that this SHIP is subject to developments coming forward
timeously, including obtaining the necessary approvals and consents
where appropriate. 
1.11 There are significant challenges with the development of affordable
housing projects. These challenges relate to:
 market volatility being experienced in the construction sector 
 increasing energy prices
 high material prices labour and material shortages
 construction boom
 economic uncertainty
 inflation
 risk allocation 
1.12 Some of the above factors have resulted in substantial tender prices 
increases and contractor claims, along with contractors unwilling to
Page 75 of 232

Page 76

tender or hold prices for any length of time. These issues are resulting in
a significant increase on tender costs where over the past 12 months are
on average 16% to 20% and this trend of tender price increases will extend
into 2024. The Scottish Government More Homes Division are fully aware
of the current issues and to help mitigate the increased costs they have
advised that additional grant monies can be considered on a project by
project basis for abnormal costs to address site specific constraints. 
1.13 This is particularly significant in relation to contributions from the private
development industry to affordable housing through the Local
Development Plan’s Affordable Housing Policy (Policy 20) where 25% of
new housing developments must include affordable housing. A high
proportion of current and future affordable housing provision is, or will be,
as a consequence of this policy. As such, the pace of this provision will be
dictated by the development industries build-out rate, intrinsically linked to
the performance of the economy and local housing markets. 
1.14 Due to unprecedented conditions within the construction market, there is
extreme volatility both with the pricing and availability of materials &
labour. 
1.17 It should be noted that some sites which are included in the SHIP are
identified for forward planning purposes only and their inclusion does not
represent a contract or award of funding for projects.
2. The Strategic Context
2.1 The planning and delivery of affordable housing is focused on meeting
local needs by supporting the ‘right homes in the right place’. The Council,
as both the statutory housing and planning authority, is responsible for
assessing housing requirements and for ensuring appropriate land in the
right places to enable the delivery of housing. 
2.2  The LHS sets out our strategic vision for housing, considering both
national policy objectives and local priorities, based on housing need and
demand evidence. As well as our strategic response to national outcomes
and national housing priorities, the LHS sets out the approach to meeting
other statutory housing responsibilities, including fuel poverty, house
condition and homelessness. It also provides people with a vital
opportunity to have their say and influence the future delivery of housing
and housing related services in their communities. The SHIP seeks to
deliver affordable housing within Perth & Kinross in the form of new build
projects, refurbishment, and renovation projects, off the shelf acquisitions
and buybacks in following tenure types to meet local needs:
 Social Rent
 Mid Market Rent
 Shared Equity
 Self Build Plots 
Page 76 of 232

Page 77

2.3 The new LHS 2022 – 2027, approved at the Housing and Social Wellbeing
Committee on 15th March 2023, sets out how PKC and its partner RSLs will
continue to deliver our vision that ‘Everyone in Perth and Kinross has access
to the right home, in the right place and at the right cost.” 
2.4 The LHS has been informed by the themes and aims set out in Housing
to 2040 for Perth and Kinross to have a well-functioning housing system –
where people can find and afford a home in the place they want to live,
including in rural communities. This is supported by the principles of
supplying high quality homes that are affordable to live in, within
sustainable communities where people want to live, supported by a good
mix of housing options. It means that places are well designed and
connected, supporting people’s wellbeing, and that homes are connected
to services, facilities, and transport links. 
2.5 The new LHS incorporates the following to meet the aims set out in
Housing to 2040: 
1. providing more homes at the heart of great places
2. providing a range of housing options that people can easily     
access, afford and keep
3. delivering housing for people with varying needs
4. delivering quality homes with affordable warmth, zero emission
and SMART technology.
2.6  This will be achieved through a set of outcomes which reflect local priorities,
national policy objectives and provide a clear strategic direction for the SHIP
2024/25 – 2028/29. 
2.7 Housing to 2040 is Scotland’s first ever long-term national housing
strategy providing a vision for what housing should look like and how it will
be provided. The strategy has four key themes: 
 More homes at the heart of great places
 Affordability and choice
 Affordable warmth and zero emissions
 Improving the quality of all homes 
2.8 PKC through the Housing to 2040 commitment will increase housing
supply by assisting to deliver the Scottish Government’s ambition to
deliver 110,000 affordable homes over the next ten years up to 2031/32
where at least 70% of these homes will be for social rent. 
2.9 The Housing to 2040 strategy sets out a specific vision for ensuring: 
 A well-functioning housing system 
 High Quality, Sustainable Homes 
 Sustainable Communities 
 Homes that Meet People’s Needs 
Page 77 of 232

Page 78

2.10 We have reviewed our strategic priorities considering the ongoing impact
of COVID and new/emerging challenges, particularly the cost-of-living
crisis and its impact on our communities and the growing climate
emergency.
2.11 Through the new Perth and Kinross Corporate Plan 2022 – 2027, we have
set a vision where everyone can live life well, free from poverty and
inequality. The Corporate Plan will guide PKC to help make decisions
about where to prioritise activity and resources in the future. This is as the
Council transforms as an organization, to deliver on our commitments, to
listen to communities and work in partnership to tackle poverty, reduce
inequalities, improve wellbeing, and support sustainable communities.
2.12 The Perth and Kinross Offer sets out how we, together with local
communities, will deliver on our ambition to recognise that everyone in
Perth and Kinross has something to offer. Our ambition is to make sure
that we acknowledge this across the area, drawing on the strengths and
assets of individuals and communities, working together so everyone in
Perth and Kinross can live life well.
2.13 The Community Planning Partnership has revised its ambition for our area
to be the best place in Scotland for everyone to live life well, free from
poverty and inequality. We will do this through:
 Reducing Poverty 
 Physical and Mental Wellbeing 
 Digital Participation 
 Learning and Development 
 Employability 
2.14 The Scottish Government’s fourth National Planning Framework (NPF4)
which was adopted by Scottish Ministers on 13th February 2023, sets out
a vision for what Scotland, as a place, could and should look like in 2050.
This will include national planning policies and provide a plan for future
development in Scotland. Driven by the overarching goal of addressing
climate change, this long-term strategy is expected to focus on achieving
four key outcomes which the Council will incorporate into its future delivery
of affordable housing through the SHIP 2024/25 – 2028/29: 
 Net Zero Emissions
 A Wellbeing Economy
 Resilient Communities
 Better Greener Places 
2.15 In addition to the ‘Housing to 2040 Strategy’, the SHIP takes cognisance
of the Scottish Government’s Housing and Planning Delivery Framework
(HPDF) which promotes more efficient collaboration between Housing and
Planning Services in relation to the Local Housing Strategy, Housing Need
and Demand Assessment and Scottish Planning Policy. Perth and Kinross
Council's Strategic Housing Investment Plan, the Local Housing Strategy,
Page 78 of 232

Page 79

and the Local Development Plan all aim to support the implementation of
the Housing and Planning Delivery Framework which aims to: 
1. increase the supply of housing 
2. make the housing system more responsive to demand
3. improve long term housing affordability 
4. reduce volatility in the housing market
2.16  A range of key strategic and planning documents including  the Local
Development Plan (LDP), the Housing Land Audit and the Perth and
Kinross Health and Social Care Partnership Strategic Investment Plan and
the Rapid Rehousing Transition Plan have also informed the SHIP.
2.17 The Council’s Child Poverty Action Report plays a pivotal role in
investment priorities for affordable housing to put poverty at the heart of
housing to reduce the cost of living and invest in areas where child poverty
is highest within Perth and Kinross. We do this by:
 increasing the supply of affordable homes within Perth and Kinross by
achieving as a minimum the Building Technical Silver Standard
(Aspects 1 & 2) to address fuel poverty
 continuing to build on the success of the ‘Home First’ initiative to
reduce the potential impact of homelessness on families 
2.18 The SHIP also recognises the fundamental role housing has in tackling
poverty. This SHIP aims to support the delivery of a range of property
types and sizes that meet the needs of households of all sizes through the
creation of high-quality energy efficient homes in sustainable communities
that support health, wellbeing, and educational attainment.
2.19 As such, our investment priorities are reflected by significant regeneration
investment in areas where levels of poverty are highest. 
Rural Areas
2.21 The Council has allocated resources to identify opportunities for new 
affordable housing in all rural areas across Perth and Kinross, including
Highland Perthshire.
2.22 The Rural Housing Fund (RHF) is available specifically for Affordable 
Housing projects in rural areas. In the current period to 2026, £25 million 
is available to fund rural projects, which is open to community-led
projects, landowners and private/charitable sector organisations. This 
fund is not open to Councils. However, to progress this opportunity the 
Council is working closely with the rural specialist agency Community 
Housing Trust (CHT) who have a proven track record of working with 
rural communities to deliver community-driven affordable housing 
projects, to date, three Community Development Trusts have been set up
in Perth & Kinross. To support this, the Council have also increased
resources in  this area and are focused on maximising RHF investment in
rural communities in the current period to 2026.  
Page 79 of 232

Page 80

City and Town Centre Living
2.23 The LHS Action Plan seeks to maximise the potential to generate more
homes through brownfield regeneration to encourage mixed use
developments and increase the number of homes created as a result of
this. A register of potential brownfield sites that would be suitable as
housing subject to change of use will be established with a PKC target of
delivery of 50% affordable homes through brownfield regeneration and
change of use for vacant properties by 2027.
3. Housing Need and Demand
3.1 The Perth and Kinross Housing need and Demand Assessment (HNDA)
was conducted across the Tayside area which includes Angus, Dundee,
Perth and Kinross and Northern Fife during 2021.
3.2 For development planning purposes, the Perth and Kinross housing
market is considered in terms of five Housing Market Areas (HMAs)
(Appendix 2 provides a list of the HMAs) and the need for additional
housing is reported at this level. The report on our most recent HNDA
completed in November 2022. The information from this will be used to
inform Housing Supply Targets in our recently adopted LHS.
3.3  The LHS sets an annual Housing Supply Target which determines the type
of market and affordable housing required to meet housing need and
demand throughout the LHS period. This includes the level of affordable
housing required to meet housing needs and a target for the delivery of
affordable homes for households with particular needs.
3.4 In order to increase housing supply and contribute towards the Housing
Supply Target, the Council, and its partners, will aim to deliver our new LHS
target of 210 affordable homes per year, an increased from previous LHS
target of 150, and is an annual average During the period 2016/17 –
2022/23 PKC delivered 1919 affordable homes, delivering on average 274
affordable homes per year. During the 2022/23 Financial Year, the Council
and its partners delivered 167 new build affordable homes and 36 buy backs
in total 203 new homes.
3.5  Our Vacant Property Development and Private Sector Housing Teams
provide advice and assistance to owners of long-term empty properties.
Having empty homes as an integral part of affordable housing provision
ensures a coordinated approach within Perth and Kinross. Through Vacant
Property Feasibility Grants, funding of professional fees for owners enables
them to undertake feasibility studies to enable repairing or re-purposing of
their empty properties. Initiative grants also enable owners to upgrade or
repair their properties in return for the properties being let through the Rent
Bond Guarantee Scheme for a period of 5 years, not exceeding current
Local Housing Allowance rent levels. The Council’s aim is to bring back 130
privately owned empty properties back into use as housing each year.
3.6  The housing needs and accommodation activity of Gypsy/Traveller
communities continues to be closely monitored by the Council. Although
Page 80 of 232

Page 81

there are no plans in the current SHIP for affordable homes for
Gypsy/Travellers, work is progressing to establish the unmet needs of
transient Gypsy/Travellers. Consultation is also continuing with the local
Gypsy/Traveller community through the findings of the Local House
Condition Survey and following the transfer of two sites to the Housing
Revenue Account (HRA). The information obtained will be used to plan
future investment and maintenance of existing sites. Recognising that
needs may change, the Council will continue to monitor the position and
be ready to embrace this through new LHS guidance as well as the action
plan.
3.7  Engagement work with site residents at existing Gyspy/Traveller
communities have resulted identifying solutions to change the
management of the council owned sites to the Housing Revenue Account.
This will enable planned maintenance programmes to ensure Scottish
Housing Regulator standards are maintained in the future. The Council
secured £3.9m of Scottish Government funding, along with its own
funding, for one of the sites to replace the chalets with energy efficient
accommodation and installation of energy-efficient lighting, heating and
hot water systems using renewable technologies. Site fencing and paths
were improved and a new play park, community garden and playing field
were created. Digital inclusion has been improved through the supply of
free internet devices to residents. Further funding will be applied for to
enable improvements at both sites along with the long-term management.
These improvements will contribute to improving fuel poverty on the sites
as well as health and wellbeing outcomes. The Council will support
applications to develop land into permanent or transit sites for
Gypsy/Travellers. The land does not need to be identified in the Local
Development Plan and no evidence of need is required. Consultation is
currently ongoing regarding Gypsy / Traveler site standards.
4. Wheelchair & Particular Needs Housing
4.1  We are committed to increasing the supply of wheelchair accessible
homes in accordance with requirements set out in the Scottish
Government Guidance Note MHDGN 2019/02.
4.2  Work is currently underway with our RSL partners to deliver wheelchair
accessible homes across urban and rural Perth and Kinross. Through our
Strategic Local Plans, the aim is to ensure that where possible, 10% of all
homes built are suitable for people with particular needs, such as
wheelchair users, where this can be met within affordable housing
development sites.
4.3  Improvements in information on the requirement for wheelchair accessible
homes alongside demographic information has developed a clearer
picture of the future requirement for wheelchair accessible housing. This
is incorporated into the 2022-27 LHS to support developers to include
specialist housing provision in private sector developments.
5. Rapid Rehousing Transition Plan (RRTP) Priorities 
Page 81 of 232

Page 82

5.1  Addressing the key Homelessness and Rough Sleeping Action Group
(HARSAG) recommendation, the Council aligns strategic housing
priorities consistent with the RRTP and ensures that the new supply of
affordable housing is fully integrated within the Council’s ‘Home First’
model.
5.2 The Council’s ‘Home First’ model was introduced in 2017 and its aim is to
assist homeless households move straight into settled accommodation
and avoiding the use of temporary accommodation. Minimising the
duration, impact, stigma, and cost of homelessness is the key objective 
as well as ensuring the best outcome for homeless households.
5.3  Increasing the supply of affordable housing will assist in meeting the RRTP
strategic aims of prevention of homelessness. In addition, it will also support
the commitment to ensuring that those in housing need to find the fastest
route to safe and secure accommodation to help them resettle in their new
homes quickly and successfully with support.
5.4  With a strong focus on the prevention of homelessness, the Council
identifies and supports those at highest risk of homelessness. This is whilst
also assisting those who find themselves homeless to be rehoused as
quickly as possible, promoting choice, and ensuring positive outcomes to
reduce the stress and trauma that homelessness brings to individuals and
families.
6. Partnership Working, Consultation and Collaboration
6.1 The SHIP has been developed and implemented through close
partnership working with the Scottish Government, RSLs, Perth and
Kinross Health and Social Care Partnership, Tenants, Housing Service,
Planning Service and community members. A number of mechanisms are
in place to ensure that a range of partners participate in the ongoing
delivery of the SHIP. There is a strong history of partnership working in
Perth and Kinross with RSLs and internal and external partners to deliver
the ambitious housing programme. There are five RSLs with active projects
within the SHIP. They also have a keen interest in continuing the
partnership working to develop affordable housing within Perth and Kinross
where we continue to maintain the increased levels of routine
communication with regular meeting in the form of the Strategic Housing
Providers Forum with senior representatives of the five main housing
associations currently operating new build programmes in Perth &
Kinross.
6.2 The Council will continue to explore options for joint working around
innovative delivery mechanisms that support the provision of affordable
housing throughout Perth and Kinross. Both the Council and RSL Partners
will continue to look for efficiencies in construction methods and will work
with the construction industry and design teams to determine the suitability
of non-traditional construction methods for projects included with the
SHIP.
Page 82 of 232

Page 83

6.3 Monthly updates with the RSL partners continue to take place. The RSL
partners continue to engage with the PKC Affordable Housing Enablers
about potential future development opportunities. The monthly meetings
bring an opportunity for partners to discuss the wider programme and
strategic issues including updates from the Scottish Government, Scottish
Water, the SHIP, and site prioritisation. Every two months, updates are
provided to the Scottish Government to discuss the programme and key
requirements throughout the programme year (focus is specific project
issues relating to planning, public utilities and slippage impacting
current/future year funding).
6.4 This structure provides the Council with a proactive approach to
monitoring project progress which complements discussions on strategic
issues affecting the delivery of affordable housing in Perth and Kinross.
6.5 In developing the SHIP 2024/25 – 2028/29, all RSLs provided project
proposals. All proposals were assessed alongside Council projects by the
Strategic Affordable Housing Board see Appendix 3. The Strategic
Affordable Housing Board were provided with projects that were assessed
against the SHIP prioritisation Framework (See Appendix 4) and approved
which projects to include within the SHIP.
6.7 The Perth and Kinross multi-agency Independent Living Panel provides
key information to the SHIP. They meet monthly and are made up of
Housing and Health and Social Care Partnership representatives,
including RSL and Care Providers. The Panel provides an integrated
approach to meeting housing, health and social care needs of people who
have been assessed with the eligibility criteria as requiring support to
enable them to live as independently as possible in their own home or
within specialist provision.
6.8 The Panel reviews and analyses and authorises the allocation of
appropriate housing provision for individuals as requiring specialist
housing, care, and support to live independently in Perth and Kinross.
6.9 The Independent Living Panel:
 makes recommendations for the allocation of accommodation for the
provision for independent living need
 ensures that an overview of demand and supply for independent living
needs in Perth & Kinross is maintained and regularly reviewed
 provides a link between NHS, PKC, HSCP and third sector partners to
ensure a joined-up approach and co-design of housing solutions for
those with specialist housing, care, and support needs
 links with the New Build Programme to ensure gaps in service
provision are met effectively and to inform the future planning and
development of services
 seeks reviews on placements in specialist accommodation to ensure
the provision is being used appropriately for those in most need
Page 83 of 232

Page 84

 conducts quality assurance checks on cases referred to the Panel to
ensure consistency across and within the allocation process and the
provision of specialist accommodation
 ensures the efficient and effective use of resources
6.10  The Council has frequent meetings with developers to discuss
development sites and how housing developments can contribute to LHS
priorities through inclusion of their proposed developments in the SHIP.
The Council have procured housing through the Scottish Procurement
Framework as well as through Section 75 agreements being made with
Developers in fulfilling the requirements of the Affordable Housing Policy.
6.11  In taking forward the LHS and the SHIP, workshop events are organised
to consult on the objectives of both and thoughts on how objectives can
best be met are invited from a wide audience of partners and community
representatives.
6.12  The SHIP document is widely circulated, and comments are invited ahead
of finalisation.
7.  Review Mechanism – Response & Resolution of Constraints
7.1  The Council regularly reviews affordable housing projects, both internally
and with RSL Partners, to ascertain progress through monthly meetings.
Tripartite meetings with officers from the Council, RSLs and the Scottish
Government will take place every 2 months.
7.2  Frequent, formal review process assists with the identification of constraints
and potential slippage in the programme at an early stage. Early contact
and liaison with internal stakeholders, such as Planning, or external
stakeholders, such as Scottish Water, has assisted the Council in
resolving constraints and achieving effective programme management
outcomes. 
8. Affordable Housing Supply Programme (AHSP) 
8.1  The Affordable Housing Supply Programme forms part of the Scottish
Government’s More Homes Scotland approach, which aims to increase
and accelerate the supply of homes across all tenures. The Programme
supports the Council in delivering our affordable housing priorities, by
providing quality homes in mixed communities that fit local need.
8.2  The grant subsidy which is available through the Affordable Housing
Supply Programme supports the delivery of social rented housing, homes
for mid-market rent, and the provision of housing for low-cost home
ownership (most notably the new supply shared equity scheme).
8.3 Resource Planning Assumptions (RPA) support the delivery of new
affordable homes across Perth and Kinross by providing grant support at
flexible benchmark rates for each affordable home developed.
Page 84 of 232

Page 85

8.4  The Council RPA for the 2023/24 Financial Year is £16.587m. Future
years 2024/25 – 2025/26 RPA funding was agreed during July 2021 as
highlighted within Table 1, (paragraph 1.8). Through Scottish Government
Guidance MHDGN 2022/02, it advises to use the 2025/26 RPA as the
basis for future years until announced. As such, it is prudent to take a
conservative approach for future years within the SHIP until further
information on RPA levels post 2026 is known, to avoid abortive work or
other cost risks.
8.5  The Affordable Housing Enablers continue to identify additional projects
and liaise with RSL partners to bring further opportunities for affordable
housing into the programme.
8.6  The SHIP projects that 1688 affordable homes could be delivered in the
period to 2028/29.
8.7  The Funding from the Scottish Government, required to deliver the
proposed affordable Housing projects as outlined within the SHIP 2024/25
– 2028/29, as per Table 1. 
8.8 Over and above the increased flexible grant benchmark rates, Scottish
Government’s baseline benchmark for the council starts at £83,584 per
unit and £91,182 per unit for housing associations (based on 3-person
equivalent as well as additional grant funding available for the following
additional quality measures additional grant funding is available from
existing benchmarks):  Resource Planning Assumptions to affordable
housing developers who meet Scottish Government criteria in relation to
specific quality and design features. This includes: 
 Delivering homes to Section 7, Silver Level, of the 2019 Building
Regulations in respect of Energy for Space Heating (this is, full Bronze
Level plus Aspect 2 of Silver Level) - £2,338 per unit (3-person
equivalent benchmark)
 Provision of balconies within flatted developments where the provision
of private or communal outdoor space cannot otherwise be
accommodated - £4,676 per unit (3-person equivalent benchmark)
 Provision of space for home working or study – £4,092 per unit (3-
person equivalent benchmark)
 Ensuring that all new social rented housing is digitally-enabled – £351
per unit (3-person equivalent benchmark)
 Installation of ducting infrastructure for electric vehicle charge point 
connectors - £585 per unit (3-person equivalent benchmark)
 Installation of electric vehicle charge points - £585 per unit (3-person
equivalent benchmark)
 Installation of automatic fire suppression systems - £3,507 per unit
(3-person equivalent benchmark)
 Installation of heating systems which produce zero direct emissions
at the point of use - £4,676 per unit (3-person equivalent benchmark). 
Page 85 of 232

Page 86

8.9 The increased flexible benchmark rates of grant and additional grant being
made available to affordable housing developers who incorporate
enhanced design elements is being met from current known RPA. This
may have an impact on the number of new affordable homes being
delivered as the level of grant for each property increases.
8.10  The Council, alongside its RSL partners, has sought to be as realistic as
possible in detailing the programme. Projects that have been assessed as
having completions by March 2024 have been programmed within the first
year of this SHIP. Years 2 and 3 of the SHIP see the conclusion of large
projects with a fewer number of projects detailed in later years. It should
be noted that the SHIP is reviewed every year.
8.11 The Council, in consultation with the Scottish Government, will continue
to manage the AHSP in conjunction with its Housing Capital Plan, Housing
Revenue Account investment, Council Tax 2nd Homes Funds, Commuted
Sums to support and maximise delivery of affordable housing in priority
areas during the SHIP period.
9. Funding Resources, Housing Revenue Account, Developer
Contributions and Council Tax (Second Homes)
Funding Resources to support delivery of SHIP priorities are summarised: 
 Housing Revenue Account (HRA) 
9.1 Prudential borrowing via the HRA is the key funding component used in
addition to Scottish Government Housing Subsidy to support the delivery
of new affordable homes for PKC affordable housing. The financial
viability of all potential Council new build projects is assessed in terms of
the Housing Revenue Account 30-year business plan, to ensure that the
capital costs generate a reasonable return on investment over the long
term. The new build programme is monitored as part of the HRA capital
monitoring process between Finance, Housing, and Property.
 Developer Contributions
9.2 Applications that meet the criteria can be made to PKC to support the
delivery of affordable homes from Developer Contributions (DCs).
Information on applications received during 2022/23 and 2023/24 to date
in respect of supporting the delivery of affordable homes are detailed
below:
Table 2:
PROVIDER PROJECT AFFORDABLE
HOMES
HMA DCs Used
(£0.00M)
Kingdom HA Bertha Park
Phase 2B
28 Strathmore &
Glens
0.056
Hillcrest Homes Old
Causeway
9 Kinross 0.096
Page 86 of 232

Page 87

Hillcrest Homes Abernethy
MMR
7 Perth 0.077   
9.3      As of 29 September 2023, there was £1.26M available within Developer
Contributions to assist in bringing forward affordable housing
developments throughout Perth and Kinross. Policy requires these funds
to be invested in the same HMA they were collected. 
 Council Tax Reserve Income from the Reduction of
Discount for Empty and Second Homes
9.4 The Council has funding available through income raised each financial
year from Council Tax (Empty Homes and 2nd Homes). This funding
assists in supporting the delivery of all affordable homes delivered by the
Council (new build and Empty Homes) and new builds for RSLs.
9.5 These funds are used to support the Vacant Property Development and
Private Sector Teams bring empty homes back into use for housing. The
following empty properties have been brought back into use as housing
through assistance of these funds:
Financial Year Empty Homes Brought Back into
2015/16 149
2016/17 138
2017/18 146
2018/19 145
2019/20 139
2020/21 93
2021/22 130
2022/23 66
TOTAL 1006 
9.6  As of 1 April 2023, the balance of funds remaining from Council Tax for
the delivery of affordable housing was £4,353,000. Since 2015/16
through the delivery of New Build affordable housing and Empty homes,
the Council has used funding of over £11m from the Council Tax to assist
with the delivery of affordable homes.
10. Affordable Housing Policy
10.1 The Developer Contributions and Affordable Housing Supplementary
Guidance (2020) which is linked to Policy 20: Affordable Housing in the
Perth and Kinross Local Development Plan 2 (2019) and sets out the
contribution that developers must make towards the delivery of affordable
housing as a condition of securing planning approval for a new build
development. The Supplementary Guidance requires new housing
developments within Perth and Kinross to provide a 25% Affordable
Housing Contribution and is currently being updated.in 2023.
Page 87 of 232

Page 88

10.2  Affordable Housing can include a variety of forms, such as social rent,
Low-Cost Home Ownership options such as Shared Equity, Mid-market /
intermediate rent, and self-build plots. Sites delivered though the
Supplementary Guidance make a significant contribution to the SHIP.
10.3  Commuted Sums make a  contribution towards the delivery of affordable
housing in Perth and Kinross. The Council continues to utilise
contributions resulting from the Supplementary Guidance to support the
delivery of affordable homes within its own programme and with RSL
partners where appropriate.
11. SHIP Prioritisation Framework
11.1  All affordable housing proposals that are to be included within the SHIP
are prioritised by the SHIP Prioritisation Framework (PF) (APPENDIX 4).
This framework prioritises investment whilst assessing the proposals
against the Council’s strategic aims and priorities, along with
deliverability, and the community benefits it will provide
11.2  In assessing projects for inclusion in the SHIP, the Council considers the
following:
 Whether the development assists with the delivery of LHS                   
outcomes
 The extent to which the development addresses housing needs
 Site attributes
 Whether planning approval is in place
 Funding requirements
 Strategic priority
 Deliverability
11.3  The PF is not intended to provide the only assessment of priority;
however, the Council will continue to balance its investment decisions
through a mixture of Council, RSL and developer delivery and by
considering a range of affordable housing tenures to meet housing need
across all the HMAs.
11.4  In recognising the need for housing to address particular support needs,
including wheelchair accessible homes, projects which provide this type
of housing will attract extra points under the scoring criteria.
12. Energy Efficiency
12.1  The Council seeks to maximise the opportunities for energy efficiency and
reduction of fuel poverty through achieving the ‘Greener’ energy
efficiency standard in new builds where practical. To meet this standard,
homes must meet Section 7 (Aspect 1 & 2) of the 2011 Building
Regulations in relation to Carbon Dioxide emissions and energy for space
heating.
Page 88 of 232

Page 89

12.2  The standard may not be attainable in all projects, particularly where an
existing building is to be redeveloped or where homes form part of a larger
development for market provision or through the PKC Buyback scheme.
12.3  The Council supports RSL partners to develop to Silver Standards as a
minimum and to provide enhanced levels as set out within the Scottish
governments Housing to 2040 vision.
12.4  The Council has developed a new net zero Design Guide. It is anticipated
by 2023/24 that all PKC new build affordable homes will meet the ‘Gold
Standard’ as a minimum and meet some of the key objectives within the
Council’s climate change strategy and action plan.
13. Equalities
13.1  The Council are fully committed to equalities and diversity. The General
Equality Duty has three main aspects:
 Eliminate Discrimination
 Advance equality of opportunity
 Foster good relations between communities. 
13.2  The Council will respond to the different needs and service requirements
of people regardless of sex, race, colour, disability, age, nationality,
marital status, ethnic origin, religion or belief, sexual orientation, or
gender re-assignment. The planning and delivery of good quality housing
and appropriate information, advice and support services embrace the
principle of equal opportunities and equality in outcomes. 
13.3  The SHIP plays a vital role in promoting this agenda. People with
specialist needs should have the opportunity to live independently in their
own homes and community. To address specialist needs, at least 10% of
new affordable homes will be delivered to meet particular support needs
(this also includes wheelchair accessible).
14. Strategic Environmental Assessment
14.1  The Strategic Environmental Assessment (Scotland) Act 2005 requires
that all qualifying plans, programmes, and strategies, including policies
are screened to assess the potential environmental impact of the plan. A
Strategic Environmental Assessment (SEA) ensures that environmental
issues are considered by decision makers alongside social and economic
issues.
14.2  The SHIP, as part of the LHS, was considered under the Environmental
Assessment (Scotland) Act 2005 and pre-screening identified that the
SHIP would have no, or minimal, environmental effects. It is therefore
exempt, and the SEA Gateway has been notified. 
Page 89 of 232

Page 90

15.  Monitoring
15.1  The SHIP is closely monitored, and funding is claimed promptly to promote
and maximise the funding invested within Perth and Kinross. Annual
reviews of progress in increasing the supply of housing are reported to the
Council’s Housing and Social Wellbeing Committee, as part of the review
of progress in implementing the LHS. 
15.2 A range of project management activities are used to ensure resources
are managed effectively with projects progressing as planned. These 
include: 
 ongoing liaison between services within the Council and between the
Council and Registered Social Landlord partners on specific projects
 multi-agency project group meetings 
 quarterly tripartite meetings involving the Council, individual
developing Registered Social Landlord partners and the Scottish
Government
 regular internal Board meetings to review progress. Throughout the
duration of this SHIP progress will continue to be monitored to support
project delivery 
Page 90 of 232

Page 91

APPENDIX 1 - Strategic Housing Investment Plan (2024/25 – 2028/29)
Affordable Housing Site Starts (2024/25 –
2028/29)     
PROVIDER 24/25 25/26 26/27 27/28 28/29 Total AH
PKC 152 174 135 105 72 638
KHA 90 16 54 58 0 218
HH 128 102 0 0 0 230
CHA 34 46 16 0 0 96
PfP 236 31 0 0 0 267
Ark 18 0 41 0 0 59
TBD 55 0 0 0 125 180
Total Site Starts 713 369 246 163 197 1688 
Affordable Housing Completions (2024/25 –
2028/29)     
PROVIDER 24/25 25/26 26/27 27/28 28/29 Total AH
PKC 82 150 121 135 75 563
KHA 149 53 28 40 14 284
HH 101 87 40 36 0 264
CHA 17 41 42 8 0 108
PfP 124 105 44 0 0 273
Ark 18 0 10 20 21 69
TBD 25 35 0 0 40 100
Total Completions 516 471 285 239 150 1661 
ARK – Ark Housing Association, Caledonia Housing Association, HH – Hillcrest Homes, KHA – Kingdom Housing Association, PKCHS – Perth & Kinross
Council Housing Service, PfP –  Places for People, TBD – To be Determined
Page 91 of 232

Page 92

Pre 2024/25 Site starts with Completions
in 2024/25+       
Project Address HMA Provider Total New
Homes Site Start Pre 24/25 Completions
24/25
Completions
25/26
Completions
26/27
Hayfield Brae, Lynedoch
Road, Methven  Perth PKC 12 12 12 0 0
Bertha Park Phase 3,
Perth Perth KHA 41 41 41 0 0
Lathro Farm, Kinross Kinross KHA 35 35 35 0 0
Broich Road Phase 4,
Crieff Strathearn KHA 12 12 12 0 0
Milnathort, Kinross  Kinross KHA 16 16 16 0 0
Abbeyfield, Crieff  Strathearn HH 9 9 9 0 0
Wester Tomaknock, Crieff Strathearn HH 25 25 25 0 0
Bertha Park Phase 4A,
Perth Perth  PfP 16 16 16 0 0      
166 166 166 0 0 
Page 92 of 232

Page 93

2024/25 Site Starts with Completions 24/25+       
Project Address HMA Provider
Total
New
Homes
Site Start
24/25 Completions 24/25 Completions 25/26 Completions
26/27
Buybacks Various PKC 30 30 30 0 0
Grewar Farm, Coupar
Angus Strathmore PKC 42 42 0 42 0
Former Balhousie
School, Perth Perth  PKC 40 40 20 20 0
Former Beechgrove
Residential Home,
Perth 
Perth  PKC 40 40 20 20 0
East of St Cedd’s
Road, Ballinluig Highland CHA 16 16 8 8 0
H31 Stanley  Perth  CHA  18 18 9 9 0
Moyness, Blairgowrie Strathmore & Glens KHA 36 36 18 18 0
Forfar Road, Meigle Strathearn KHA  36 36 18 18 0
Broich Road Phase 3,
Crieff Strathearn KHA 18 18 9 9 0
Page 93 of 232

Page 94

Hatton Road, Rattray Strathmore & Glens HH 42 42 21 21 0
Duntaylor Avenue,
Aberfeldy Highland HH 45 45 25 20 0
Oudenarde Site Perth HH 41 41 21 20 0
Westpark Phase 1,
Blairgowrie Strathmore & Glens PfP 73 73 30 30 13
Scone North Perth PfP 60 60 30 30 0
Bertha Park Phase 4B,
Perth  Perth PfP 18 18 18 0 0
Almond Valley Phase
1, Perth Perth  PfP 85 85 30 30 25
Hawarden Terrace,
Perth  Perth  Ark  18  18  18  0  0 
Broich Road, Crieff Strathearn TBD 55 55 25 35 0      
695 695 332 330 38           
Page 94 of 232

Page 95

2025/26 Site Starts with Completions
2025/26+       
Project Address HMA Provider
Total
New
Homes
Site Start 25/26 Completions 25/26 Completions 26/27 Completions 27/28
Buybacks Various PKC 30 30 30 0 0
Atholl Road/Elm Court,
Pitlochry Highland PKC 18 18 8 10 0
Former Hillside Hospital,
Perth  Perth  PKC/HH 70 70 20 25 25
Thimblerow, Perth  Perth  PKC/HH 60 60 10 25 25
Borlick Phase 1,
Aberfeldy Highland PKC 35 35 10 15 10
Haugh Road, Blairgowrie Strathmore &
Glens CHA 30 30 15 15 0
Former Co-op &
Adjacent Site, Perth  Perth  CHA 16 16 8 8 0
H30 Stanley Perth  KHA 16 16 8 8 0
Strathmore Terrace,
Alyth
Strathmore &
Glens HH/PKC 51 51 10 20 21
Moncur Road, Inchture Perth HH 12 12 6 6 0
Westpark Phase 2A,
Blairgowrie
Strathmore &
Glens PfP 31 31 15 16 0      
369 369 140 148 81 
Page 95 of 232

Page 96

2026/27 Site Starts with Completions
2026/27+       
Project Address HMA Provider
Total
New
Homes
Site Start 26/27 Completions 26/27 Completions 27/28 Completions 28/29
Buybacks Various PKC 30 30 30 0 0
St Catherines Square,
Perth Perth PKC 30 30 10 20 0
Borlick Phase 2,
Aberfeldy Highland PKC 35 35 10 10 15
Rossie Place (Ph 1 & 2),
Auchterarder Strathearn PKC 40 40 10 10 20
Former Co-op &
Adjacent Site, Perth  Perth  CHA 16 16 8 8 0
Bertha Park Phase 4C,
Perth Perth KHA 54 54 20 20 14
Westpark Phase 2B Strathmore
& Glens Ark 41 41 10 20 21      
246 246 98 88 70 
Page 96 of 232

Page 97

2027/28 Site Starts with
Completions 2027/28+                
Project
Address HMA Provider Total New Homes Site Start 27/28 Completions 27/28 Completions 28/29 Completions 29/30
Buybacks Various PKC 30 30 30 0 0
Rossie Place
(Ph 3 & 4),
Auchterarder
Perth  PKC 40 40 10 10 20
Perth West Perth PKC 35 35 10 10 15
Bertha Park,
Perth (Ph5) Perth KHA 58 58 20 20 18      
163 163 70 40 53 
Page 97 of 232

Page 98

2028/29 Site Starts with
Completions 2028/29+                
Project
Address  HMA Developer  Total
Units  Site Start 28/29  Completions 28/29  Completions 29/30  Completions 30/31 
Buybacks  Various  PKC  30 30 30 0  0 
Stanley H30
(Ph2)  Perth  PKC  22 22 0  22 0 
Perth West Perth TBD 65 65 20 20 25
Bertha Park,
Perth (Ph6) Perth TBD 60 60 20 20 20
Rossie Place
(Ph 5),
Auchterarder
Perth PKC  20 20 10 10 0      
197 197 80 72 45 
Page 98 of 232

Page 99

Appendix 2 – HMAs
Perth and Kinross Settlements by HMA 
HMA 
Greater Perth Abernethy. Abernyte. Almond bank. Balbeggie. Bankfoot. Bridge of Earn.
Dunning. Errol. Forgandenny. Glencarse. Glenfarg. Guildtown. Inchture,
Invergowrie, Longforgan. Luncarty. Methven, Murthly, Perth. Scone.
Stanley. St Madoes. Wolfhill
Highland  Aberfeldy. Ballinluig, Blair Atholl. Dunkeld. Fearnan. Kenmore.
Kinloch Rannoch. Pitlochry
Kinross  Blairingone. Crook of Devon, Glendevon. Keltybridge.
Kinnesswood, Kinross, Milnathort, Powmill, Scotlandwell
Strathearn  Aberuthven, Auchterarder, Blackford. Braco, Comrie, Crieff.
Gilmerton. Gleneagles, Greenloaning. Muthill, St Fillans
Strathmore and
Glens (formerly
Eastern Perthshire) 
Alyth. Ardler. Blairgowrie. Bridge of Cally. Burrelton. Caputh. Coupar
Angus. Kettins, Kirkmichael, Meigle. Meikleour, New Alyth.
Spittalfield. Woodside
Page 99 of 232

Page 100

Appendix 3
Strategic Affordable Housing Board Members (Note: a separate Board, with the following members plus the Council’s Capital Programme officer
is responsible for detailed governance of PKC-only sites. Governance arrangements are under review pending the implementation of the Council’s
Senior Leadership Review.) 
Name Position within PKC
Elaine Ritchie Senior Service Manager (Housing)  
Ben Wilson Service Manager – Planning and Housing Strategy
Nicola Lennon Service Manager - Housing
Kevin Divin Team Leader – Housing Strategy
Steven Coyle Finance and Governance Team Leader
Page 100 of 232

Page 101

Appendix 4 – SHIP Prioritisation 
Methodology Prioritisation Framework Scoring
Introduction
The Prioritisation Framework provides a tool to prioritise investment which balances the Council’s strategic objectives, deliverability,
and community benefits. It is used to assess projects for inclusion in the SHIP, which will assist in deciding whether we bring projects
forward to SHIP inclusion.
The framework does not provide the only assessment of priority and Perth and Kinross Council will continue to balance its investment
decisions through a mixture of Council, Registered Social Landlord and Developer delivery by considering a range of affordable
housing tenures to meet housing needs across its Housing Market Area.
As projects develop there may be a need to adjust to the scoring output as, for example, planning permission is granted, or wider
community benefits are realised. This may cause the priority of a project to be revised during the life of the SHIP.
Scoring Criteria
1. Contribution to general unmet Housing Need: 
What level of demand can we evidence for a project? How much need is there in the area for affordable housing? What are  
the waiting lists like? What are we predicting for future trends? The scoring structure for demand:
 High - between 7 and 10
 Medium - between 4 and 6
 Low - between 0 and 3
2. Inclusion, Equality and Meeting Particular Needs 
If a project is planned to make additional provision for particular needs (such as wheelchair accessible housing) and/or             
meets a particular needs demand in an area it should score more highly.
 High - between 7 and 10
 Medium - between 4 and 6
 Low - between 0 and 3
Page 101 of 232

Page 102

3. Wider Community benefit and Regeneration: 
If a project delivers wider community amenities or benefits that make a significant contribution to the regeneration of an area    
it should score more highly. Points should also be awarded if the project secures the future of a historic or listed building or 
reuses a brownfield site.
 High - between 7 and 10
 Medium - between 4 and 6
 Low - between 0 and 3
4. Meets agreed strategic priority (Contribution to SOA and LHS Objectives) 
Project is assessed in terms of the overall contribution it would make to achieve the strategic objectives of the Single Outcome  
Agreement and the Local Housing Strategy. The project is assessed depending upon how many objectives the project was 
assessed as contributing towards. The scoring structure:
 High - between 7 and 10
 Medium - between 4 and 6
 Low - between 0 and 3
5. Project Deliverability             
This assesses whether a project is likely to be deliverable within the SHIP timescale. Factors that are considered are whether     
the site is in the ownership of Perth and Kinross or the RSL, and the progress anticipated to be achievable. The scoring               
structure:
 High - between 7 and 10
 Medium - between 4 and 6
 Low - between 0 and 3 
 
Weighting of scores
Whilst all these measures are important considerations when deciding whether a project goes on to the SHIP, it is felt that the
importance of criteria one should give it extra weighting relative to the other criteria.
Thus, the scoring will be out of a possible sixty, with each of the five criteria scored out of ten but with the score for criteria one
doubled to reflect its importance.
Page 102 of 232

Page 103

The RAG rating for projects:
Low priority Medium priority High priority
1 – 20 20 - 40 40 + 
Reds should be presented to the project board with a recommendation not to add to the SHIP, Ambers would be considered for
inclusion after reviewing any other pertinent factors, Greens would be strong recommendation for inclusion and progression as a
priority. 
Page 103 of 232

Page 104

Page 104 of 232

Page 105

PERTH AND KINROSS COUNCIL 
Housing and Social Wellbeing Committee 
29 November 2023 
BEECHGROVE HOUSE 
Report by Strategic Lead, Economy, Development and Planning
(Report No. 23/337) 
1. PURPOSE 
1.1  This report provides an update and a response to the Motion presented to
Council on 18 February 2020. This motion requested officers to carry out a
detailed options appraisal regarding the future use of the buildings and site of
Beechgrove House, Perth and explore the viability of the site for future health
and social care provision and mixed-tenure housing. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee 
• notes the background to this report;
• notes the outcome of the Feasibility Cost Plan
• agrees to a design team being appointed to progress with the project 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1  Perth and Kinross Health and Social Care Partnership (HSCP) took the
decision to close Beechgrove as a Care Home on 23 March 2018. While
approval for demolition and redevelopment of the site was completed in early
2020, the onset of the Covid pandemic resulted in a decision to retain the
building to enable the HSCP to provide clinical services on site on a
temporary basis The motion required Council Officers to carry out a full and
detailed options appraisal in relation to the future use of the current buildings
and site formerly Beechgrove House, and in particular within that wide-ranging
appraisal to explore the viability of the site for future health and social care
and mixed tenure housing.  
6
Page 105 of 232

Page 106

4.2  A Strategic Business Case (SBC) was prepared in August 2021 to consider
potential future uses of the site.  This was to ensure that the proposed
development option met corporate and strategic priorities and helped to
achieve positive outcomes for people in Perth & Kinross, and met with the
Motion. Discussions have continued with the H&SCP/NHS Tayside in relation
to finding suitable alternative accommodation for the important clinical
services currently delivered at Beechgrove. The notice to quit, however, was
served on 24 July 2023 to take forward allow the Motion to be fully met. 
4.3  The SBC identified that, to meet the key priorities of Housing, HSCP and the
Corporate objectives, three broad options were most suitable to be considered
for the future use of the site and buildings: 
i. repurposing the buildings for Health and Social Care Services
permanently;
ii. demolishing and redeveloping the site for affordable housing;
iii. Demolishing and redeveloping the site for affordable housing with a
“hub” for HSCP services. 
4.4  Having considered these options, the business case concluded that the most
favourable was option (ii): demolition and redevelopment of the site for
affordable housing. 
4.5  It was further noted that the site was already included in the Council’s
Strategic Housing Investment plan (SHIP) as a site for affordable housing to
be developed by Perth and Kinross Council. 
4.6  A Feasibility Cost Plan was commissioned from Brownriggs Cost Consultants,
based on available information about the existing building, and for the new
build option on speculative proposals, completed prior to the Covid pandemic,
for 40 units of housing. 
4.7  This Feasibility Cost Plan was completed in January 2022 (with costs revised
in September 2023). It considered two approaches to development: 
a) demolition and new build housing
b) conversion/refurbishment of the existing building for housing 
4.8  The respective costs attached to these options are set out in the following
table: 
New build Conversion
No. of units  40 20-25 (note 1)
Development cost (£millions)  6.504 3.496
Cost per m2 (£)  2,464 1,949
Average cost/unit (£)  162,600 140-175,000       
(Note 1: in the absence of any design information this is estimated on floor area alone) 
Page 106 of 232

Page 107

4.9  With reference to the potential conversion of the care home into affordable
housing, this was previously explored in the Strategic Business Case
prepared in August 2021 and discarded as a viable option on the following
grounds: 
• the proposed residential conversion of the care home would result in
approximately 20-25 units as opposed to a new build affordable housing
project consisting of 40 homes.
• any conversion of the care home into affordable homes is unlikely to
achieve the diversity of house types to address local housing demand as
well as meeting Housing for Varying Needs (hfvn).
• it would be very difficult (potentially impossible) to optimise the energy
efficiency in the existing building to meet the Scottish Housing Quality
Standard and high energy standards within the Heat and Build strategy set
out in the Government’s Housing to 2040 document and within the Climate
Change (Scotland) Act 2019. This was brought forward by the Scottish
Government’s More Homes Division in their latest grant funding criteria
that require all new affordable homes from December 2023 to have a zero-
carbon heating system. 
4.10  While these figures are presented only as a broad indication of the respective
options, new build sits within the scale of the per unit cost of conversion.
However, the costs for this option would ensure enhanced construction quality
and greater compliance with current energy performance standards. It would
also provide the opportunity to reform the site in accordance with good
practice in place-making. 
5. PROPOSALS 
5.1  The Feasibility Cost Plan outcomes, presented at section 4 above, indicate 
that a new build housing solution for the site offers a better outcome than 
retention and conversion of the existing building. 
5.2 It is proposed that development proposals are advanced to develop the entire
site for a mixed tenure affordable housing development to meet the  specific
needs of older people. The Housing Learning and Improvement Network were
commissioned by Perth and Kinross Council to review best practice and
benefits and challenges within the older persons housing market in the UK. 
This also included an evaluation of opportunities for both housing and care
development in Perth and Kinross. 
5.3 This report identified that improvements were required regarding the available
housing options for older people to support many to downsize from large and
unsuitable accommodation, as well as to meet the needs of older people with
particular support requirements. 
Page 107 of 232

Page 108

5.4 Based on the feasibility cost plan, it has been estimated that 40 affordable 
homes of a mixed tenure could be built on the current site creating a 
sustainable and settled community. Twenty-seven units could be for Council 
Social Rent and 13 could be for Mid-Market Rent. Redevelopment of the site 
predominantly for housing suitable for older people may be viewed more 
favourably in view of the past use of the site as a residential home. It would 
also help to address the current and potential future challenges facing the 
Health & Social Care Partnership in terms of the ageing population and 
enabling people to live independently at home, as long as possible. 
5.5 To take the project forward, if Committee approves the approach, a team will
be appointed to design the project based on the above and the housing need
and demand information provided by the Housing Service and key partners.
This will include information on the housing support needs of older people
locally. The design team will be appointed, through the appropriate
procurement process, with a target date  for construction commencing in
financial year 2025-26. 
5.6 The housing proposal will be financed in part from the second home Council
Tax fund. In addition, developer’s contributions for affordable housing will be
used to support the delivery of the programme including prudential borrowing
through the Housing Revenue Account (HRA). Financial support through
grant funding provided by the Scottish Government’s Affordable Housing
Supply Programme (AHSP) has already been included in the Council’s
Strategic Housing Investment Plan (SHIP) for 40 homes. As such, the future
programme and timescale will, therefore, be subject to the approval of the
Scottish Government through its More Homes Division. 
6. CONCLUSION   
6.1  The motion of 18 February 2020 required the Council to carry out an options
appraisal into the future use of the site and buildings of Beechgrove House to
explore its potential to deliver facilities for health and social care and
affordable housing. 
6.2  A Strategic Business Case in 2021 concluded that demolition and
redevelopment of the site for affordable housing was the preferred option. 
6.3  A Feasibility Cost Plan completed in January 2022, and updated in
September 2023, demonstrated the difference in cost between new build
housing and retention and conversion of the existing buildings. 
6.4  It is proposed that the Beechgrove site be developed as a mixed tenure
affordable housing development for 40 homes to meet the specific needs of
older people. It was also proposed that a design team be appointed to
progress with this project to provide much needed affordable housing within
the area. 
Page 108 of 232

Page 109

Author
Name  Designation Contact Details
Kevin Divin  Housing Strategy  (01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
21 November 2023 
APPENDICES 
• Appendix 1 - Feasibility Cost Plan (Brownriggs Cost Consultants, Sept 2023) 
Page 109 of 232

Page 110

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  YES
Corporate Plan  YES
Resource Implications  
Financial  YES
Workforce No
Asset Management (land, property, IST) YES
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  None 
The Impact & Value Assessment (IVA) has been designed to screen every Council
project, strategy or proposal against statutory and non-statutory environmental,
social and economic requirements. It has replaced the previous existing Integrated
Appraisal Toolkit (IAT). 
Beechgrove Affordable Housing Project - Impact & Value Assessment Report 
1. Strategic Implications 
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(i) Reducing Poverty (including child poverty, fuel poverty and food poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan: -  
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
Page 110 of 232

Page 111

(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of  
climate and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 Resource implications arising directly from this report emanate from the
proposed local authority new build housing programme (as detailed in the
SHIP appended). In addition to the Scottish Government Grant, the second
home Council Tax fund and developer’s contributions for affordable housing
will be used to support the delivery of the programme including prudential
borrowing. Detailed resource assumptions on the use of these funds will be
reported to respective Council Committees when final details are known.  
Workforce  
2.2 There are no workforce implications arising from this report.  
Asset Management (land, property, IT)  
There are no asset management implications arising from this report. This site 
has been identified via the SHIP 2024/25 – 2028/29 are in ownership of the 
Housing Revenue Account and the General Fund. Discussions are ongoing 
with various departments regarding potential valuations, transfers to the 
Housing Revenue Account for the delivery of affordable housing. 
3. Assessments  
Equality Impact Assessment 
3.1 This report has been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome:  
(i) Assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. No further action is required as it does not qualify as a PPS as
defined by the Act and is therefore exempt. The Environmental Assessment
(Scotland) Act 2005 places a duty on the Council to identify and assess the
environmental consequences of its proposals. A Pre Screening Report has
Page 111 of 232

Page 112

been provided to SEA Gateway. Having consulted the three consultation
authorities and having considered the criteria set out in the Act, the Council
considers that the Beechgrove Affordable Housing Project is unlikely to have
significant environmental effects. The relevant policy has been subject to
assessment through the SEA of the Local Development Plan 2 (2019) so
significant environmental effects as a result of the guidance that have not
already been assessed elsewhere are unlikely. The Council has therefore
determined that SEA is not required.   
Beechgrove - SEA Pre Screening Report 
Sustainability    
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation programmes;
and
• in a way that it considers most sustainable.  
3.4 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Legal and Governance  
3.5 Not applicable.  
Risk  
3.6 Not applicable. 
4. Consultation 
Internal 
4.1 Heads of Service and senior managers from Housing, and Planning have 
been consulted on the content of this report. 
• Planning
• Education
• Health and Social Care Partnership
• Housing
• Estates
• Economic Development
Page 112 of 232

Page 113

• Occupational Health
• Finance 
• Asset Management 
External 
4.2 Consultation via various organisations progressed through external meetings
from May 2023 – September 2023 with the following: - 
• Scottish Government
• Scottish Water
• Local Community and Key Stakeholders
4.3 In addition, when this project develops, a further consultation exercise will be
undertaken with the local community on the development proposals during
design and development of the project as well as before the formal
submission of the planning application. 
2. BACKGROUND PAPERS 
2.1 The following background papers were used to inform this report: 
• Scottish Government – Guidance on preparing Strategic Housing 
Investment Plans: Guidance Note MHDGN 2022/01 Strategic Housing 
Investment Plan (SHIP) guidance note MHDGN 2022/01 - gov.scot (www.gov.scot)
• Scottish Government - Affordable Housing Supply Programme: 
Process and Procedures MHDGN 2020/20 Affordable Housing Supply 
Programme: process and procedures MHDGN 2020/02 - gov.scot (www.gov.scot) 
Page 113 of 232

Page 114

Page 114 of 232

Page 115

Chartered Quantity Surveyors • Construction Consultants • CDM Consultants
Project No.     
4789 
Issued:  
28th September 2023
Perth & Kinross Council
Beechgrove, Perth
Feasibility Cost Plan (Rev 1)
6
Page 115 of 232

Page 116

Residential Development
Beechgrove, Perth
Perth and Kinross Council
Feasibility Cost Plan (Rev 1)
1. Introduction
Brownriggs were requested by Perth & Kinross Council to update the previously prepared Feasibility Cost Plan
(dated 31st January 2022) to reflect construction cost inflation in the period, which was for two (2) potential
options for development of an existing care home site at Beechgrove, Perth, based on the limited drawings
available.
In the absence of any additional/updated design information, it was agreed this Cost Plan should be simply
updated to reflect construction cost inflation in the period between 1Q 2022 and 3Q 2023, therefore no
cognisance has been made for enhanced building standards, energy performance/sustainability requirements
or the like which may have arisen in the period. For the purposes of updating for construction cost inflation,
current published BCIS Indices have been assessed which indicate an inflationary increase of circa 12% and
has been utilised to update previous Construction Costs.
The two (2) options currently being considered can be summarised as follows:
Option 1 - New Build Housing
Demolition of the existing care home building, site clearance and construction of thirty-three (33) new build
houses together with associated external/infrastructure works.
Based on the drawing information available, anticipated construction costs have been prepared by applying
benchmark costs/m2 to house types and calculating elemental unit quantities for site works and drainage
with current build rates applied thereafter.
The Anticipated Construction Cost, Cost per m2 Gross Floor Area (2,639 m2) and Average Cost per Unit (33 Nr)
are summarised in the table below.
Anticipated Costs
Description Construction Development
Anticipated Cost £6,223,060 £6,503,560
Anticipated Cost per m2 £2,358 £2,464
Anticipated Average Cost per Unit £188,578 £197,078
Option 2 - Conversion/Refurbishment of Existing Building
Re-modelling and refurbishment of existing care home building to provide new flatted accommodation.
Based on the drawing information available, anticipated construction costs have been prepared by applying
costs/m2, obtained from recent project similar in nature, to the Gross Floor Area of the existing building for
re-modelling/refurbishment works. A Provisional Sum allowance of £300,000 has been included for associated
site works and drainage.
Page 1
Page 116 of 232

Page 117

Residential Development
Beechgrove, Perth
Perth and Kinross Council
Feasibility Cost Plan (Rev 1)
The Anticipated Construction Cost and Cost per m2 Gross Floor Area (1,794 m2) are summarised in the table
below.
Anticipated Costs
Description Construction Development
Anticipated Cost £3,395,970 £3,495,970
Anticipated Cost per m2 £1,893 £1,949
Anticipated Average Cost per Unit TBC TBC
* Note: The above figures relate to Construction Costs and exclude Other Development Costs
In the absence of indicative Architectural layouts for this option, it is not known how many flats/persons are
likely to be accommodated within the existing building and will need to be established in due course. Based on
our assessment of a previous project, similar in nature, on a pro-rata Gross Floor Area basis we would envisage
twenty (20) to twenty-five (25) one and two bedroom flats may be achievable.
The costs contained within this report reflect the RIBA Architect's Plan of Work - Stage 1.
The Drawings used in preparation of Cost Plan were as follows:-
Option 1
• SK-190411 Proposed Site Layout
Option 2
• L(90)-01 Site Block Plan
• Lot 6 Beechgrove RHE GF
• Lot 6 Beechgrove RHE 1F
The costs are based on the project proceeding as a single stage selective tender and should be read in
conjunction with Section 3 - Qualifications and Section 4 - Exclusions
Page 2
Page 117 of 232

Page 118

Residential Development
Beechgrove, Perth
Perth and Kinross Council
Feasibility Cost Plan (Rev 1)
2. Cost Summary - Option 1 - New Build
Description Amount
Building Cost £ 3,826,550.00       
External Works & Drainage £ 1,134,435.00       
£ 4,960,985.00       
Preliminaries £ 595,320.00          
£ 5,556,305.00       
Inflationary Adjustment (1Q 2022 to 3Q
2023) - allow circa +12% based on
assessment of current BCIS Indices
666,755.00          
Total Construction Cost £ 6,223,060.00       
Add
Project Development Costs (Excluding Land) £ 280,500.00          
Option 1 Total £ 6,503,560.00       
Page 3
Page 118 of 232

Page 119

Residential Development
Beechgrove, Perth
Perth and Kinross Council
Feasibility Cost Plan (Rev 1)
2. Cost Summary - Option 2 - Conversion
Building Cost £ 2,520,570.00       
External Works & Drainage £ 300,000.00          
£ 2,820,570.00       
Inflationary Adjustment (1Q 2022 to 3Q
2023) - allow circa +12% based on
assessment of current BCIS Indices
338,470.00          
3,159,040.00       
Contingencies £ 236,930.00          
Total Construction Cost £ 3,395,970.00       
Add
Project Development Costs (Excluding Land) £ 100,000.00          
Option 2 Total £ 3,495,970.00       
Page 4
Page 119 of 232

Page 120

Residential Development
Beechgrove, Perth
Perth and Kinross Council
Feasibility Cost Plan (Rev 1)
3. Qualifications
The following qualifications should be read in conjunction with the foregoing cost summary.
1) Costs based on a single construction project
2) An allowance of £8,500.00/unit has been allowed for the Development Costs within Option 1.
3) An allowance of £100,000.00 has been allowed for the Development Costs within Option 2.
4) The costs are based on reasonable ground conditions with no allowance for any 'abnormals'
5) Base date for cost is 3Q 2023 with no allowance for future inflation
6) Given the limited scope of works for Option 2, the costs include a 7.5% contingency allowance.
No contingencies have been allowed for Option 1.
7) A provisional allowance of £150,000.00 has been allowed for demolitions within Option 1. It  is
assumed that all soft strip out will be carried out by client prior to demolition.
8) A provisional allowance of £300,000.00 has been allowed for Option 2 external works until
a scope of works is available.
4. Exclusions
The following exclusions should be read in conjunction with the foregoing cost summary.
1) Excludes finance charges, land purchase, legal costs and V.A.T.
2) Excludes floor finishes
3) Excludes off-site works
4) Excludes any allowance for blinds/curtains/white goods/furniture/fittings/equipment
5) Excludes fully replacing existing roads/pavements outwith the site boundary.
6) Excludes any works for upgrading the existing Scottish Water network.
7) Excludes any asbestos removals
8) Excludes any pre-contract design team fees & non-novated post contract fees.
Page 5
Page 120 of 232

Page 121

Perth And Kinross Council 
Housing & Social Wellbeing Committee 
29 November 2023 
WARM WELCOME AND GOOD FOOD FUNDS 
Report by the Director of Strategy, People and Resources
(Report No. 23/338) 
1. PURPOSE 
1.1 This report provides information on the delivery of the Warm Welcome Fund
(formerly the Cost-of-Living Fund) and the Good Food Fund (formerly the
Food Security Fund). 
2. RECOMMEDATIONS 
2.1 It is recommended that Council: 
• Note the impact from the Cost-of-Living Fund
• Note the impact from the Food Security Fund
• Note the change in approach to delivering the Warm Welcome Fund 
• Note the change in approach to delivering the Good Food Fund 
• Approve an evaluation of the process and impact of the Warm Welcome
Fund
• Approve a formal recognition of the efforts of community volunteers in
delivering Warm Welcome Fund Projects
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 The Cost-of-Living Fund was aimed at providing funding for community
groups to provide warm spaces, activities, food and warm home packs for
people negatively impacted by the cost-of-living crisis over the winter of
2022/23.  An initial £320K was made available, with the fund opening for
applications in October 2022.  However due to need a further £100K was
added to the fund in December 2022, with all of the money being allocated by
January 2023. 
7
Page 121 of 232

Page 122

4.2 The evaluation process demonstrated that the funding had a positive impact
on communities, not only through the provision of warm spaces, helping
address poor physical and mental wellbeing, food and fuel poverty and social
isolation, particularly in rural areas, helping develop greater inclusivity within
communities.  The Cost of Living Fund also provided food and warm home
packs, giving people the opportunity to stay warm in their own homes.  The
role of community volunteers was critical in the successful delivery of the
Fund and has helped community groups to develop their own capacity and
ability to meet emerging needs within their communities.   
5. WARM WELCOME FUND 23/24 
5.1 Through monitoring and evaluation of the Fund (Appendix 1) it was clear that
the funding provided much needed support to households during the winter
months, however the feedback identified that some warm spaces had been
under used and levels of uptake were lower than anticipated by local groups.
There was also duplication in some areas with groups offering competing
activities at the same time, as well as gaps in some communities where no
activities or spaces were available. 
5.2 To ensure that community groups worked more collaboratively across all
areas of Perth and Kinross a revised model for 23/24 was developed.
Throughout August and September Community Learning & Development
Workers from Culture and Community Services facilitated workshops in each
ward area, inviting local groups and organisations to attend with project
proposals that set out how they would work in partnership to meet the needs
of their local communities. 
5.3 An initial £200K was allocated as part of the Council budget for 23/24 with an
additional £50K agreed in September 2023. The original £200K funding was
split by ward area, based on the population in that ward as follows: 
Ward 1 £12,960 Ward 2 £20,120 Ward 3 £14,775
Ward 4 £12,075 Ward 5 £16,820 Ward 6 £14,280
Ward 7 £15,670 Ward 8 £19,160 Ward 9 £12,440
Ward 10 £21,088 Ward 11 £16,403 Ward 12 £24,208 
5.4 The additional £50K was used in wards where need exceeded the allocated
funding. Funds were paid to groups and organisations by the end of October
2023. Monitoring of take up and feedback will be ongoing, and a wider
evaluation will take place at the of the financial year 23/24 to establish the
effectiveness of the fund and identify and areas for improvement. 
5.5 In order to recognise the valuable work carried out by volunteers delivering
Warm Welcome Fund projects in their local communities it is proposed to hold
a celebration event in the Civic Hall in March 2024.  Planning and delivery of
this event will be carried out with PKAVS (Perth and Kinross Association of
Voluntary Service) in their role as lead agency for volunteer support in Perth
and Kinross.
Page 122 of 232

Page 123

6. FOOD SECURITY FUND 
6.1 The Scottish Government’s Good Food Nation Act was passed on 15 June
2022 with the vision that by 2025 Scotland will be “a Good Food Nation,
where people from every walk of life take pride and pleasure in, and benefit
from, the food they produce, buy, cook, serve, and eat each day.”   
6.2 The Perth and Kinross Food Security Fund was available for community
groups to apply for throughout 2022/23. £235,000 was available to local
groups and organisations to provide projects which targeted food waste and
food insecurity. Detailed information on projects funded can be found in
Appendix 2.   
6.3 The Good Food Fund was open to applications in May 2023 with a budget of
£50,000.  Groups were able to apply for a maximum of £4000. 20 groups
have been funded to deliver projects based on the vision of the Good Food
Nation Act, taking a more dignified approach to tackling food insecurity. 
7. PROPOSALS 
7.1 The revised Warm Welcome Fund model has been well received by
community groups and the result is a locally co-ordinated approach to
providing warm spaces and warm packs in communities across Perth &
Kinross with no duplication which maximises the use of the funding and
provides best value. 
7.2 The monitoring and evaluation of the Warm Welcome Fund will be adapted to
ensure officers collect information on the impact of the fund. Funded projects
will be asked to keep a record of overall attendances at warm spaces as well
as the number of ‘unique’ attendees and numbers of warm packs issued.
There will be communications across the winter months to promote what is
available in each area. 
7.3 The revised Good Food Fund model has enabled groups to think creatively
about delivering the vision of the Good Food Nation Act and move towards a
preventative approach rather than emergency food response.  The result is
that this year organisations have applied for projects with a focus on a holistic
way of tackling food insecurity. 
7.4 Projects have been supported which educate and upskill community members
on healthy eating and cooking on a budget whilst also targeting diet related ill
health and social isolation. Projects have been supported to promote a cash
first approach and have received copies of the ‘Worrying About Money?’
leaflet. A detailed evaluation will be undertaken in 2024 to measure the impact
of the fund. Projects will be asked to detail how they have helped those within
their community at risk of poverty to overcome food insecurity and to provide
case studies which demonstrate impact. 
Page 123 of 232

Page 124

8. CONCLUSION AND RECOMMENDATIONS 
8.1 Community Groups and Organisations are working collaboratively across all
areas of Perth and Kinross to provide a varied programme of activities over
the winter period which provide a warm welcome to those struggling with cost
of living and social isolation. Through this collaborative approach, groups are
also able to use the funding to provide co-ordinated provisions of warm home
packs to those most vulnerable at home. 
8.2 Community Groups and Organisations are making significant steps to move
away from an emergency food response through the use of funding for
innovative projects which promote healthy eating, cooking on a budget and
reducing social isolation, whilst also promoting a cash first approach. 
Author
Name  Designation Contact Details
Karen Evans  Team Leader kevans@pkc.gov.uk 
01738 475000 
Approved 
Name Designation Date
Clare Mailer  Director (Strategy,
People and Resources)
6 November 2023 
APPENDICES 
• Appendix 1 – Cost of Living Report 2022/23
• Appendix 2 – Food Security Fund Report 2022/23
• Appendix 3 – Ward Breakdowns of Allocated Funding 
Page 124 of 232

Page 125

ANNEX 
1. IMPLICATION, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications  Yes / None 
Community Plan / Single Outcome Agreement    Yes
Corporate Plan    Yes
Resource Implications    
Financial    None
Workforce   None
Asset Management (land, property, IST)   None
Assessments    
Equality Impact Assessment   None
Strategic Environmental Assessment   None
Sustainability (community, economic, environmental)   None
Legal and Governance    None
Risk   None
Consultation   
Internal    Yes
External    None
Communication   
Communications Plan    Yes  
1. Strategic Implications 
Community Plan/Single Outcome Agreement    
1.1 This report supports the following priorities within the Community Plan 2022-
27:  
i. Reducing Poverty (including child poverty, fuel poverty and food
poverty) 
ii. Mental and physical wellbeing 
iv. Skills, learning and development 
v. Employability 
Corporate Plan    
1.2 This report supports the following objectives within the draft new Corporate
Plan:  
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it;  
(iv) Communities are resilient and physically, digital and socially    
connected;   
Page 125 of 232

Page 126

2. Resource Implications 
Financial    
2.1 Not applicable. 
Workforce 
2.2 Not applicable. 
3. Assessments 
Equality Impact Assessment    
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these
duties.  The Equality Impact Assessment undertaken in relation to this report
can be viewed clicking here. 
i. Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment    
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
Sustainability     
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act:    
• in the way best calculated to delivery of the Act’s emissions reduction
targets; 
• in the way best calculated to deliver any statutory adaptation
programmes; and 
• in a way that it considers most sustainable. 
Legal and Governance 
3.4 Not applicable.  
Risk 
3.6 Not applicable.
Page 126 of 232

Page 127

4. Consultation 
Internal 
4.1 Kim Macdonald, Good Food Co-ordinator. 
External    
4.2 Not applicable.  
5. Communication 
5.1 A plan has been developed with the communications team to promote the
warm spaces available. A printable PDF for each ward area will be created for
local promotion as well as promotion through online channels. A video
showcasing a variety of the warm spaces will also be created in January
2024. 
2. BACKGROUND PAPERS  
2.1 None. 
Page 127 of 232

Page 128

Page 128 of 232

Page 129

Cost of Living Fund Information
A Perth and Kinross where everyone can live 
life well, free from poverty and inequalities
7
Page 129 of 232

Page 130

Cost of Living Fund 
A Perth and Kinross where everyone can live life well, free from poverty and inequalities  2
The fund opened in October 2022 and closed in January 2023 when all funds had been
allocated.
Initially there was £320,000 available for community groups and organisations to apply for.
This was extended in December 2022 and a further £100,000 was added. In total there was
£420,000 available for the purposes of creating warm spaces, food and warm home packs.
The project was delivered by the Communities team who met weekly to assess applications
and gather information from organisations about their proposals.
£170,000 for the costs of warm spaces was distributed to 95 successful applicants.
£250,000 for the costs of food support and/or warm home packs was distributed to 85
successful applicants.
In total there were 120 different organisations receiving funding for warm spaces and/or
warm home packs/food support.
Information regarding availability of warm spaces was promoted through our website, social
media and existing networks. 
Page 130 of 232

Page 131

Cost of Living Fund Information for Evaluation
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 3
Evaluation
• There were 78 evaluation returns from the 120 organisations = 65% returns
• Based on these returns alone, here are the stats:
• 16,575 people benefitted from the fund (roughly 11% of the population of Perth &
Kinross)
• 1049 volunteers were involved in delivering warm spaces, warm home packs, food
and activities.
• 28 organisations had spent all of their funding at the time of evaluation.
• 32 organisations had NOT spent all of their funding at the time of evaluation.
• 18 organisations spent more than allocated and topped up from their other funds. 
Geographical spread of applications by ward area 
Page 131 of 232

Page 132

Cost of Living Fund 
A Perth and Kinross where everyone can live life well, free from poverty and inequalities  4
Changes made to initially planned projects (a sample of
responses)
• We made some adjustments due to unanticipated utilities costs (Perthshire
Women’s Aid)
• Introduced support services coming to our warm spaces (Letham 4 All)
• Electricity costs increased so part of the grant was used to cover this (KYTHE)
• Lunch and Kitchen component was greater than anticipated due to the high take up
of the warm space (Strathmore Community Hub)
• 24 respondents cited that they made changes from their original plans including: 8
respondents noted that increased utilities and food costs impacted on their planned
activities. 
How did the funding benefit the community?
Theme No of respondents
Helped to tackle social isolation 28
Provided residents with safe, warm spaces 49
Provided residents with resources to stay
warm at home
15
Provided residents with food 35
Created more opportunities within the
community which will continue
15 
Page 132 of 232

Page 133

Cost of Living Fund Information for Evaluation
A Perth and Kinross where everyone can live life well, free from poverty and inequalities 5
Quotes:
“We provided the only warm space in the
Tulloch area including evening open
times, food and activities” 
(Tulloch Net)
“5 of our volunteers achieved their Food
Hygiene Certificates” 
(Burrelton Community Hub)
“Numbers of people attending has
increased due to increased awareness.
New social relationships have been
formed” 
(Orwell and Portmoak Church)
“Funding helped with heating costs and
allowed us to continue community
activities instead of having to cancel
through the winter” 
(Clunie Hall Association) 
“Since starting the warm packs, we have
had 20 new men through the door” 
(Man Talk)
“A group of individuals formed a new
group as a result of the warm space”
(Dunning Community Council)
“2 people found employment through
engaging in the warm space. We have
been able to provide stimulation and
increased activities throughout the
winter months. People were able to
come together and found friendship and
support” 
(Rannoch Community Trust)
“Someone said that for the first time in
15 years they have friends and feel
welcomed, valued and accepted. Another
said it was their first conversation in a
week”
(The Grub Hub)
“All libraries in Perth & Kinross were able
to distribute 574 warm packs to adults
and children” 
(Culture P&K)
“15 community groups were involved in 9
venues, over 1000 hours of ‘cosy space
opportunities’ and 127 cosy packs
provided” 
(Community Action Plan Auchterarder) 
Page 133 of 232

Page 134

Cost of Living Fund 
A Perth and Kinross where everyone can live life well, free from poverty and inequalities  6
How did the funding help tackle inequalities?
Theme No of respondents
Positive impact on Mental and Physical Health 16
Supported those experiencing fuel and food poverty 32
Increased inclusion and sense of community 38
Reduced financial embarrassment 11
Provided support in rural areas 9 
Quotes:
“By providing warm packs we could
ensure that people could remain warm at
home and the provision of meals meant
that people didn’t have to choose
between heat or eat” 
(Letham Community Sports Club)
“Providing financial support to purchase
food has taken away some of the
financial stress on unpaid carers who
have increased energy costs to keep
loved ones warm or visit them in
hospital” 
(PKAVS carers)
“We have been able to provide blankets
to older people, those with disabilities,
those facing homelessness or struggling
with their tenancies” 
(Scottish Fire and Rescue Service)
“There was a real benefit to people
knowing that lunch would be provided
and their heating didn’t need to be on
until the evening – saved money and
worry” 
(St. Columba’s Episcopal Church)
“Our free activities enabled older people
to get out and socialise which also
improved their physical and mental
health” 
(Dunbarney and Forgandenny Parish
Church)
“Even though our objective is to look
after the ethnic minorities in the
community, we supported anyone who
needed help” 
(Perth Minorities Association) 
Page 134 of 232

Page 135

What have we learned?
• We need to improve cohesive partnership working in localities to avoid duplication
of services. 
• We need to ensure that funding is distributed fairly across the whole of Perth &
Kinross, particularly in relation to needs in rural communities.
• We need to support groups and organisations to ensure they are adopting best value
approaches.
• We need to change the language to ensure we reduce the stigma attached to ‘Cost
of living’. 
Feedback from staff involved in delivering the fund:
“I took satisfaction in being part of a team which is helping people in the community,
helping bring people together to prevent isolation, and realising the importance of the
human need for contact and communication between each other”
“Throughout the delivery of the Cost-of-Living Fund, I have learned the importance of
community engagement, partnership and collaborative working and I have a better
understanding of the needs of our diverse communities more clearly”.
“The fund has allowed us to increase our understanding of the needs prevalent in our
communities and provide resources for them to tackle these inequalities at a local level.
To have over 1000 volunteers involved is phenomenal and demonstrates the sense of
community across all areas of Perth & Kinross”. 
Page 135 of 232

Page 136

Page 136 of 232

Page 137

RM and KM 27/01/2023 
1
Food Security Fund Report-
A total of 37 community projects across Perth and Kinross have been supported by
the Food Security Fund. 7 of these projects applied to the Cost-of-Living Fund but
due to limited funds were supported by the Food Security Fund.
A total of £235,866.67 has been distributed to communities across P&K including
£40,000 for Perth and Kinross Foodbank. 
The fund has supported-
• REHIS Food Hygiene certificates- 13 individuals including volunteers and
staff have completed this. This is an element of the Community Cookit course
and needs to be completed to run a cooking group. There are 5 awaiting to
complete this.
• Community members and groups to improve their cooking skills
through delivery of Community Cookit- £2566.25 supported the delivery of
Community Cookit training and individuals to complete REHIS Food Hygiene
Training. 
In total £2,780.00 has supported 3 different groups across P&K to run these
sessions:
1. Burrelton Community Hub received £1000 to purchase equipment for
running cooking sessions for individuals and families. The aim of these
sessions was for participants to learn how to cook simple and nutritional
meals while working within a tight budget and helping households make
better choices and reduce their food waste. 
2. Perth Academy received £1460 towards cooking activities for their Family
Engagement Food and Warm Room Project. This project is being run by
the HE department and is teaching vulnerable families how to cook a 2-
course family meal for £10 per family, provided with a £10 utensil pack.
3. The Drug and Alcohol Recovery Team received £320 towards running a
cooking group with those recovering from Drug and Alcohol addiction. 
• Sport or activity sessions which include a healthy snack or meal to
support families during holiday periods-
In total £13,138.03 has supported 7 different groups across P&K to run these
sessions:
1. Summer Family Fun Project- £380 to support summer activities in East
Perthshire for 4 weeks in July. 
Appendix 2 7
Page 137 of 232

Page 138

RM and KM 27/01/2023 
2
2. Tulloch Primary School Summer Club- £501 to provide lunch and take-
home fruit and vegetable bags. 
3. Blairgowrie and Rattray Football Club- £960 for Gofitba project (Food
poverty and healthy lifestyle programme). 
4. Kettins Community Hub- £600 for summer family fun days project. 
5. Blue Door Foodbank- £7,000 to provide packed lunch parcels for children
referred by the school with the inclusion of a voucher to attend free local
activities run in the town. 
6. Alyth Food for Thought- £122.03 for DIY lunch packs and summer
activities project.
7. Broke not Broken- £3575 for Tuesday Trips project. 
• Community groups to obtain equipment such as shelving, fridges,
freezers and containers to ensure the food community members are
receiving is properly stored. 
In total £47,695.87 has supported this, including £30,000 for the
refurbishment of Giraffes Community kitchen. Projects supported include:
1. Letham4all Community Fridge- £960 for freezer at Muirton Foodshare.
2. Letham4all, Giraffe and People with a Mission Ministries (PWAMM)
Partnership- £8815.87 to provide equipment necessary to bring PWAMMS
up to legal and consistent standards to produce and provide meals.
3. Crieff Connexions Community Store- £5,100.00 for minor refurbishment
and shelving, equipment for store, signs and marketing for new store.
4. Madoch Centre- £2820 to purchase and power a fridge and freezer for the
pantry. 
• Voucher and veg box schemes- 
In total, £44,885 has been given to 3 different community groups to support
voucher and veg box schemes:
1. Tulloch Primary School Summer Club- provided £10 vouchers for local
shop (£300 in total).
2. Broke not Broken- Winter Warmer Project (£5,200 for 100x £20 vouchers
and 100x £6 veg box scheme), Easter Hampers (£2,000 for vouchers and
£600 for veg boxes to support 100 households), Christmas Hampers
(£5345 for vouchers and Christmas butcher vouchers for Christmas
dinner) and Voucher Scheme (£31,080 for supermarket vouchers).
Page 138 of 232

Page 139

RM and KM 27/01/2023 
3
3. Perth Academy- Family Engagement Food and Warm Room Project (£360
for vouchers). 
Feedback-
• Broke not Broken (BNB):
From March this year to November there has been a 245% increase in the total
amount of people being supported. In the last week of November, BNB supported
192 individuals with food. Each food parcel contains non-perishable food, but also
fresh fruit, fresh veg, fresh dairy including butter cheese milk and yogurts. Toiletries
and cleaning products as well as sanitary products are also included. If requested by
referral agent, we also add in vouchers or give vouchers instead of a food parcel if
preferred. This is a max of £40.
BNB have not opened a warm space; the food bank space is tiny, and we don’t have
access to any other spaces locally. BNB run a parent and tots’ group at a local hall
and have applied for funding to open that an extra day, as it is warm and lunch for
adults and toddlers is included there as well as a Baby bank of food, nappies and
formula. BNB also run a women’s group which meets regularly around different
subjects including breast cancer awareness, human rights, storytelling, and for
Christmas a wreath making workshop. Food is included at all of these, and in some
instances additional support e.g., voucher for buying a new bra at the breast cancer
awareness event. 
“Using vouchers are key to managing demand. They are also key to giving
people as much dignity as possible. I won’t undersell the logistics involved
though. We choose to offer clients vouchers for the shop they tend to use the
most. This means that currently we buy in vouchers for Asda, Morrisons,
Sainsburys and Aldi. They must be bought in advance of course, so we need
to gauge use based on the month before. We keep records of who gets what
including pin numbers in case they don’t work, which can happen. And we
tend to post out or hand deliver. However, if they don’t receive the vouchers,
we can’t reissue, so it can be tricky relying on the post sometimes. 
Page 139 of 232

Page 140

RM and KM 27/01/2023 
4
Our preference is ALDI orange vouchers, as they get good value for money,
and can’t buy alcohol tobacco or lottery tickets, and I know funder like these
parameters. 
If this is a route the council is looking to go down, I would recommend doing
some work with local supermarkets, as we have had (rare) instances of people
being questioned about why they have vouchers, and where did they get them,
which can be very difficult for people. 
But I would say on balance if people were offered the choice, 95% would
choose vouchers over a food parcel.” 
• Perth Academy-
The families were very appreciative of the food, vouchers, utensil packs and 2
course meals, especially so close to Christmas as all families had issues with
finances and had been targeted for this reason. Families have reported cooking
together as a family since the cooking group.
“Yes, they were great from start to finish all the support staff and teachers
great it was a great experience”
“I really appreciated the time and help offered. My kid finds classes difficult
but managed which has boosted confidence. It was nice and relaxed, and the
staff were friendly”
COMMUNITY COOKIT 
What is it?
The Community Cookit Project, part of the PKC Local Improvement Plan (LOIP), is
based on a train the trainer model and has taught a variety of services within Perth
and Kinross the essential cooking skills and basic nutritional knowledge to run a
successful cooking group.
In light of the cost-of-living crisis it is ever more important to ensure that families and
individuals have the appropriate skills and knowledge to cook cheap, healthy meals.
At present there is an increasing overweight population in Scotland, and in Tayside,
more than 2/3rds of the population are overweight or obese (NHS Tayside Director
of Public Health Annual Report 2022). Highlighting the need for communities to have
the correct skills and knowledge to be able to cook is key.
The Community Cookit project was developed in 2015 for the homeless, to teach
cooking skills for independent living. It is a community health initiative delivered in
partnership with NHS Tayside and Perth & Kinross Council. To date, it has
expanded, teaching a wide variety of staff from local authority teams including
Page 140 of 232

Page 141

RM and KM 27/01/2023 
5
education & housing along with staff from several third sector organisations. Who
now deliver projects locally in ways which benefit their client groups. 
Due to the Coronavirus pandemic and the cost-of-living crisis, Community Cookit has
further developed to suit the needs of the communities, by changing the way training
is delivered. It also now focuses on using foodbanks ingredients and low-cost energy
meals which can still be healthy.
There are three main training elements to complete to become a Community
Cookit Coach. These are -
1. Two half day sessions through Microsoft Teams online and one full day
practical session face-to-face.
2. REHIS Food & Health – nutrition through the lifespan which is a recognised
accredited qualification. Full day training with small test at the end.
3. REHIS Elementary Food Hygiene – there is a cost for this, however over the
last financial year the PKC Food Security Fund has supported participants
with this. The Level 2 Food Hygiene Training is also available through PKC
Adult Learning Hub. 
4. There is also a one-hour Microsoft Teams follow up session, six months later.
This gives the opportunity for the Cookit coaches to feedback on groups they
have delivered, for them to get support with a particular issue and to network
with other Cookit coaches.
This year nineteen individuals have been trained from various services such as
Turning Point Scotland, OWLS (One-Stop Women’s Learning Service), Salvation
Army, Move Ahead, Burrelton Community Group, Blue Door Foodbank, Wellbeing
Support for Older People Team, SCYD (Strathmore Centre for Youth Development),
Care in the Community and Drugs & Alcohol Recovery Team. Out of the nineteen
individuals trained in Community Cookit this year, four are volunteers. 
Positive outcomes-
There have been many positive outcomes from the Community Cookit Programme.
These include strong partnership working and building positive working relationships
with participants. Participants have also been able to build these relationships and
network with each other. This allows us to promote and signpost other training
and/or opportunities available for example various funding streams to support their
projects. Last year we managed to support various projects to run cooking activities,
lunch clubs etc from applications to the Food Security Fund, The Malnutrition in
Older People Fund, The Maternal and Infant Nutrition Fund and The Cost-of-Living
Community Fund. 
Page 141 of 232

Page 142

RM and KM 27/01/2023 
6
Projects supported include-
1. Stanley Lunch Club - 
This is a lunch club for older adults which focuses on the prevention of
undernutrition amongst this age group. The group secured funding for
providing boost boxes to those that needed nutritional support as well as
providing soup, sandwiches and cakes for those who attend. The Boost Box
contains fourteen nutritious snacks to help calorie and protein intake for those
most at risk of malnutrition. These funding streams have helped to lengthen
the project to continue running throughout 2023 and to subsidise the cost to
participants who attend the club.
Other organisations who have been supported to run similar projects across
Perth and Kinross, include Sanda Court Sheltered Accommodation, Elder
Voice, and the Madoch Centre. 
2. Drug & Alcohol Recovery Team – Ran an eight-week cookery course for
those recovering from drug and alcohol addiction. 
3. Cooking in rural
Communities
(Kirkmichael) – This project was run by the Good Food Co-ordinator and the
Community Learning and Development Team of PKC. It was a four-week
cooking programme that’s aim was to mitigate the effects of the cost-of-living
crisis, bring people within a small rural community together, teach basic
cooking skills and the importance of good nutrition. The ingredients for the
cooking group were also purchased through the local shop. The group ran for
four weeks, and participants all tried new foods and learnt new recipes. The
Page 142 of 232

Page 143

RM and KM 27/01/2023 
7
group also noted the importance of the social aspect of attending the group.
They all developed positive relationships with one another and felt that
attending the group improved their mental health. One of the participants from
the group is keen to complete the Community Cook it Training and carry on a
cooking group within Kirkmichael. So far, this participant has completed the
REHIS Food Hygiene certificate. 
Positive comments from participants- 
“I feel part of the community.”
“Cooking as part of a group is always fun.”
“Meeting new people and socialising has been great. Our house is quite
lonely and isolated, so it has been nice to get out and meet people.”
“I have learnt new cooking techniques and skills.” 
4. Turning Point Scotland - Carry out 1-1 home visits with their clients which
can be long-term depending on client’s circumstances.  Sometimes put
together meals from store cupboard and foodbank ingredients incorporating
healthier options. 
5. Burrelton Community Hub – Ran a cooking group over the summer holidays
teaching 28 young people essential skills to cook simple, healthy meals. They
ran three different sessions with a mix of ages on different days, the first
session ran with young people from the ages of 7-10 years, the second
session 11-13 years and the third 14-17 years. The Burrelton Community Hub
also run a Shephard’s’ Hut which acts as a reduced-price shop. The group
receive food from Fareshare, Lidl and local growers. They also run a
Community Café, baby and toddler group and a Sunday Dine group.
Throughout these groups they also focus on prevention of malnutrition. 
Positive comment-
“I just wanted to firstly say that you all done an amazing job today!! Absolutely
amazing. We as a family have tried to find clubs and sessions like the ones
you run and have never found one like this until we heard about you. The
children were nervous going in and you both welcomed them in and took care
of them. When it was time to pick up the kids they couldn’t wait to tell us and
show us all the new skills they learned today. Which they then came home
and made some for their siblings. It definitely gave them an uplift, I really hope
we get another opportunity to come to another session with yourselves again.
The kids met some lovely kids and all had a wonderful time. They asked if you
are doing anymore day sessions if they could possibly join.” 
Page 143 of 232

Page 144

RM and KM 27/01/2023 
8
6. OWLS (One-Stop Women’s Learning Service) - run a cooking group once a
week for six weeks (ongoing) incorporating everything from the Community
Cookit training and including using foodbank ingredients.
Positive comment-
“I enjoyed that and will definitely make that recipe again”. 
7. Community Learning Disability Team – run block cooking groups once a
week and 1:1 cooking.
Positive comments – 
“I’m glad I came. The people are nice and helpful. Get’s me out the house. I
have more confidence from being as part of a group. I learned to cook
different stuff – I thought I couldn’t do it”.
“Enjoyed socialising, get’s me away from the Xbox”.
“I like the cooking. I like doing the carrots, never done them in my life.
Learned a lot – peeling”. 
These highlights show how the project can be easily adapted based on the
community that is being worked with and individual needs. They also demonstrate
the variety of services across Perth and Kinross that have been trained and deliver
related projects. 
Other positive outcomes from the project:
• Manageable number of participants trained to allow us to provide ongoing
support.
• Encouraging participants to attend P&K Stronger Communities for networking.
• Participants encouraged partaking in further training if certain learning is
identified such as NHS Eatwell Playwell Training (families with under-five’s),
Weaning Training (introducing solid foods) and Get Nourished (prevention of
malnutrition). 
What have we learnt / barriers to the project?
• Community Cookit can be tailored to suit client/ groups needs.
• Partnership working helps identify the need for other services and/ or trainings
required e.g. Get Nourished, Eatwell Playwell etc. 
• Community Cookit helps support volunteers in receiving REHIS qualifications
which may help towards entrance of college or employment.
• Need to identify suitable venues for running training.
• Further support for Cookit Coaches to help them set up cooking groups within
their community. This may include providing funding or sourcing suitable
venues. 
Page 144 of 232

Page 145

RM and KM 27/01/2023 
9
Future support and areas for improvement-
• Recipe translation has taken place to translate recipes into other languages
including Polish, Romanian, Ukrainian, and Hungarian to help support cooking
initiatives with participants of other nationalities. 
• A newly developed resource ‘How to Cut the Cost of Cooking’ to be piloted.
This resource was developed from feedback from community groups. It was
highlighted that there was not a lot of clear information about the cost of
cooking. This resource discusses different cooking methods and the costs
associated with these. It also gives advice on how to cook on a budget with
guidance on meal planning, batch cooking and food shopping. There are
games and activities within the resource that can be used with community
groups to spark discussions and share information.
• Identify suitable venues to run Community Cookit across Perth and Kinross to
maximise the number of people trained.
• Adapt or add on to the six-month follow-up session to allow opportunity for
face-to-face evaluation to take place. 
What impact has the project made?
The project has brought communities together from across Perth and Kinross and
allowed people to support one another within social settings. It upskills individuals in
nutritional knowledge, basic cooking skills, knowledge on how to cook on a budget/
batch-cooking, food waste and it allows networking and connections to other
services. This project has supported a vast and varied number of services supporting
elements with food & fuel poverty, mental and physical wellbeing (healthy weight),
adult and family learning, employability (REHIS), digital participation (online training
and some resources), and community empowerment. 
Page 145 of 232

Page 146

Page 146 of 232

Page 147

Appendix 3
1. Cost of Living Fund 22/23 
Ward 1 – Carse of Gowrie
Group Project  Funding 
Stormontfield Community Association  Warm space  £400.00
St Madoes & Kinfauns Parish Church Warm space / packs £2,982.00
Tay & Earn Trust Warm space / refreshment £3,230.00
Errol Leisure Ltd Warm space & food £2,400.00
TOTAL £9,012.00 
Ward 2 – Strathmore
Group Project Funding 
Alyth Senior Citizens  Food/ blankets £2,612.00
Alyth Youth Partnership Food / clothing £7,410.00
The Anglers Inn Food / warm packs £2,000.00
Strathmore Community Hub Warm space / food / warm packs £2,780.00
Thrifty One CIC  Warm space  £1,537.00
Cascade Institute Warm space  £858.00
Burrelton Community Hub Warm space/Food £1,000.00
Robert Douglas Memorial Institute Warm space £2,170.00
St Martin's Public Hall Warm space/Food £1,200.00
Kinrossie Public Hall Management
Group
Warm space  £300.00
Meigle and Ardler Community Council Food £800.00
Cascade Institute Warm space £858.00
TOTAL £23,525.00 
Ward 3 – Blairgowrie & The Glens
Group Project Funding 
St Vincent de Paul  Fuel vouchers £2,000.00
Nest Creative Spaces Food £300.00
Kirkmichael Session House Warm space / food  £1,300.00
B&R Community Football Club Warm space  £382.50
Blairgowrie Players  Warm space £2,000.00
Mantalk Warm space / food £1,656.00
St Stephen's RC Church (Tea/Coffee
Chat Time)
Warm space/Food £1,250.00
MANTALK Warm Home Packs £1,720.00
Bridge of Cally Village Hall Warm space £4,092.40
Blairgowrie & Rattray Development
Trust
Warm space £2,130.00
Blairgowrie & Rattray Development
Trust
Food for the provision of warm meals £1,170.00
Booklore Warm space with free refreshments  £298.08
TOTAL £18,298.98
7
Page 147 of 232

Page 148

Ward 4 – Highland
Group Project Funding
Horizon Lunch Club Food £1,840.00
Aberfeldy Parish Church Warms space / food £6,340.00
Camserney Hall Warm space £1,000.00
Rannoch Community Trust Warm space £2,500.00
Rannoch Community Trust Warm space £2,500.00
Upper Tay Anti-Poverty Support Food / warm packs £3,750.00
Holy Trinity Pitlochry  Warm space/  food  £500.00
Clunie Hall Association Warm space £500.00
Atholl Baptist Centre Warm space / food  £1,500.00
Pitlochry Church of Scotland Warm space / food  £1,680.00
Pitlochry & Moulin Men's shed  Food £867.00
St Brides Catholic Church Warm space/Food £480.00
TOTAL £23,457.00 
Ward 5 – Strathtay 
Group Project Funding
Birnam Arts Heating /food /warm space £12,548.00
Birks Cinema Trust Food / refreshments / warm space £5,970.00
Stanley Development Trust  Warm space / resources £4,813.75
Dunkeld Parish Church  Warm space £1,440.00
Amulree Village Hall Trust Fund Food £204.00
Bankfoot Foodshare Pantry Pantry Construction & Posters/Leaflets
printing
£525.00
TOTAL £25,500.75 
Ward 6 – Strathearn
Group Project Funding
Logos Warm spaces/ food / packs £2,420.00
Comrie & District Men's Shed  Warm space £3,840.00
Strathearn Artspace  Heating / food £9,148.00
Crieff Connexions Heating £1,920.00
St Columba’s Crieff Heating / food / packs £1,155.00
Strathearn Cares  Warm home packs £2,500.00
Crieff Baptist Church  Warm space / refreshments £250.00
Fowlis Wester Village Hall Committee Warm Space/Food £480.00
TOTAL £21,713.00 
Page 148 of 232

Page 149

Ward 7 – Strathallan
Group Project Funding
Muthil Baby and Toddler Group Warm space / food £1,276.50
Aberuthven & Dunning Church Warm space/ refreshments £1,000.00
Muthill Monday Club Refreshments / resources £5,000.00
Aberuthven Village Hall Trust heating / food / packs £1,974.00
Aberuthven and Dunning Church  Food  £1,000.00
Muthill Kirk Session  Warm home packs £2,176.00
Auchterarder Bowling Club  Warm space £2,500.00
Auchterarder Community Sports &
Recreation 
Warm space / packs £7,252.75
Ardoch Parish Church  Warm space £2,660.00
Blackford Parish Church Warm space £1,025.00
Dunning Community Council Warm Space/Warm Home Packs £2,000.00
Aberuthven and Dunning Church Food £500.00
Dunning Community Council Warm space/Various activities and
refreshments
£500.00
Aberuthven Village Hall Trust Warm space for with 'Film Nights' and
Games Nights.
£800.00
TOTAL £29,664.25 
Ward 8 – Kinross-shire
Group Project Funding 
Kinross Centre Food / warm home packs £4,900.00
Arngask Hall (Glenfarg) Warm space £2,500.00
Kinross Parish Church  Refreshments £500.00
Broke not Broken Warm home packs £6,500.00
Kythe Heating £11,000.00
Oudenarde Community Group Food / warm packs £2,400.00
Kinross & District Men's Shed  Warm space/ refreshments £820.00
Orwell and Portmoak Church  Warm space / food  £2,500.00
Carnbo & District Hall Warm space / food  £330.00
Glenfarg Community Transport Group Warm space £500.00
TOTAL £31,950.00 
Ward 9 – Almond & Earn
Group Project Funding 
Methven & Dist CC  Heating / food / warm packs £5,110.00
66th Perthshire (Abernethy) Scout
Group
Warm space £500.00
TOTAL £5,610.00 
Page 149 of 232

Page 150

Ward 10 – Perth City South 
Group Project Funding 
Craigie & Moncrieffe Messy Church Warm space / food £500.00
Perthshire Womens Aid  Heating / resources  £13,000.00
T42 Group ar Fairview School Food £448.00
TOTAL £13,948.00 
Ward 11 – Perth City North
Group Project Funding 
Tulloch Net Warm space / food  £1,002.00
Letham Climate Challenge Warm Home Packs £1,000.00
Perth College UHI Warm space/Food £3,156.00
Riverside Church Warm space £1,000.00
The St Johnstone Community Trust Warm space/Food £13,358.00
Letham4all Vouchers for emergency packs £5,000.00
Letham Community Sports Club Food £3,000.00
TOTAL £27,516.00 
Ward 12 – Perth City Centre
Group Project Funding 
Perth St Matthews Church Warm Space £500.00
APC Community Garden Allotments £1,000.00
Bridgend & Gannochy CC Energy / food £2,500.00
YMCA Tayside Warm space/ food £15,240.00
Social Flock Clothing packs ( £8,497 returned to fund
as unspent) 
£32,000.00
Health & Wellbeing café  Food £1,300.00
Giraffe Meal distribution £10,000.00
Letham St Marks Warm space £2,000.00
Letham Climate Challenge Warm space/ food / equipment £2,470.00
Perth Minorities Association  Wood / resources £5,000.00
PKAVS Carers Centre Food £6,625.00
Bajka Heating £6,000.00
Lighthouse for Perth Warm packs £1,500.00
CPK Warm packs refreshments / resources £9,628.25
CATH Heating / packs £15,358.00
St Ninians Cathedral Heating / food £3,400.00
Trinity Church of the Nazarene Heating / food / packs  £5,000.00
Vitality Me Warm space / food £6,500.00
St John the Baptist Church Perth  Warm space £700.00
Sanda Court Lounge/ Older Persons
Wellbeing
Warm space  £3,200.00
Simon Community Scotland  Warm packs £2,500.00
Homestart Food / bedding £2,000.00
Page 150 of 232

Page 151

Buttons & Bows  Warm space  £1,800.00
Perthshire Welfare Society Warm space / food  £5,280.00
Adventure Circus SCIO Warm space £1,199.98
Aberlour Sustain Warm space £1,443.00
Perth Elementary Pentecostal Church
(Grub Hub)
Warm space/Food £1,500.00
Perth St Leonards In The Fields Church Warm space/Food £2,060.00
VitalitymeCIC/Jeanfield Swifts
Community Club
Warm Space/Food £2,015.00
St Matthew's Church, Perth Warm space/Food £1,000.00
Culture Perth & Kinross Libraries Warm Home Packs £7,283.00
CPK/Police Scotland Vouchers for Emergency Warm Home
Packs
£2,500.00
Perthshire Welfare Society Food £1,200.00
Mountain Belle Wellness and Trinity
Church
Warm space/Food £630.00
Scottish FIre & Rescue Service
Community Action Team
Warm space/Fire Retardant Cellular
Blankets
£1,026.00
People With A Mission Ministries Warm space  £1,000.00
Giraffe Food costs for free meals to distribute £10,000.00
North Muirton Community Group Energy costs for providing a warm space £2,500.00
Cooking In the Community (Trinity
Church of the Nazarene)
Cooking lessons / warm space for young
adults and mums
£420.00
Trinity Church of the Nazarene Warm space £3,500.00
All Strong Scotland CIC  Food / utilities for Warm Space  £500.00
TOTAL £181,278.23 
Page 151 of 232

Page 152

2. Warm Welcome Fund 23/24 
Ward 1 – Carse of Gowrie
Group Project  Funding 
Social Flock Ward 1 Warm clothing packs £1,132.50
Madoch Centre Warm space £4,450.00
Errol Parish Church Warm space £2,100.00
Errol Toddlers Group  Warm space £1,520.00
TOTAL £9,202.50 
Ward 2 – Strathmore
Group Project Funding 
Social Flock Ward 2 Warm clothing packs £2,370.00
CPK Libraries - Ward 2 Warm packs / warm space £824.00
Alyth Seniors Lunch Club Warm space £1,400.00
Alyth Halls Committee Warm space £1,607.00
RDMI  Warm space £2,927.00
Burrelton Community Hub Warm space £1,307.00
Strathmore Community Hub  Warm space £2,537.00
New Age Kurling  Warm space £1,357.00
Coupar Angus Thursday Friends  Warm space £407.00
Stormontfield Community Association  Warm space £860.00
Alyth Youth Partnership Warm space / clothing £2,107.00
Guildtown Friendship Club Warm space £807.00
CAYAG Warm space £1,607.00
Alyth & District 50+Club Warm space £931.50
TOTAL £21,048.50 
Ward 3 – Blairgowrie & The Glens
Group Project Funding 
Social Flock Ward 3  Warm clothing packs £641.67
St Stephen’s RC Church  Warm space £1,810.00
Mantalk  Warm space £2,765.00
Nest Creative Spaces  Warm space £1,230.00
Bridge of Cally Village Hall  Warm space £1,609.60
Blair & Rattray Development Trust  Warm space £1,930.00
Women’s Walk & Talk Warm space £750.00
SCYD  Warm space £3,800.00
Kirkmichael Session House  Warm space £929.73
Elder Voice  Warm space £2,400.00
CPK Libraries Ward 3 Warm space / Warm packs  £824.00
TOTAL £18,690 
Page 152 of 232

Page 153

Ward 4 – Highland
Group Project Funding
Upper Tay Anti-Poverty Support
Group 
Warm space £1,900.00
Pitlochry Bowling Club  Warm space £1,650.00
Breathe Project  Warm space £1,900.00
Birks Cinema  Warm space £1,900.00
Baptist Church  Warm Space £1,650.00
Atholl Centre  Warm Space £1,650.00
McLean Hall, Fearnan  Warm Space £750.00
CPK Libraries - Ward 4 Warm space / warm packs  £675.00
Rannoch Community Trust   Warm Space £3,000.00
Tulach Golf Club - Blair Atholl  Warm Space  £5,000.00
TOTAL £20,075.00 
Ward 5 – Strathtay 
Group Project Funding
Dunkeld Archives  Warm space £3,725.00
Bertha Park Blether Warm space £2,546.00
Bertha Park Community Group  -
Warm Packs 
Warm packs £952.00
Stanley Development Trust - Family
Food & Fun 
Warm space £4,520.36
Stanley Development Trust - Winter
Warmer
Warm space £2,448.00
Birnam Arts  Warm space £1,771.50
Bankfoot Cuppa and Company  Warm space £1,050.00
Social Flock Ward 5 Warm clothing packs £832.50
TOTAL £17,845.36 
Ward 6 – Strathearn
Group Project Funding
Strathearn Arts  Warm space £3,200.00
Logos Youth Project Warm space £1,000.00
St Columba's Church - Cosy Craft Warm space £1,500.00
St Columba's Church - Warm Packs  Warm packs  £1,500.00
Crieff Connexions  Warm space £2,475.00
Comrie Men's Shed Warm space £2,000.00
CPK Libraries - Ward 6 Warm space / Warm packs £500.00
Social Flock - Ward 6 Warm clothing packs  £1,445.00
Madderty Community Association Warm space £360.00
Crieff Baptist Church  Warm space £300.00
TOTAL £14,280.00 
Page 153 of 232

Page 154

Ward 7 – Strathallan
Group Project Funding
Aberuthven & Dunning Parish Church  Warm space £2,030.00
Blackford Parish Church  Warm space £1,045.00
Auchterarder Action Plan Group Warm space £7,710.00
Ardoch Parish Church Warm space £1,710.00
Aberuthven Village Hall  Warm space £2,300.00
CPK Libraries - Ward 7 Warm space / warm packs  £800.00
Auchterarder Men's Shed  Warm space £400.00
Muthill & Tullibardine Community
Council 
Warm space £1,370.00
Social Flock Ward - 7 Warm clothing packs £1,245.00
TOTAL £18,610.00 
Ward 8 – Kinross-shire
Group Project Funding 
Carnbo & District Hall Association  Warm space  £330.00
Orwell and Portmoak Church  Warm space £2,000.00
Milnathort Film House  Warm space £2,200.00
Kinross Centre  Warm space £2,840.00
CPK Libraries Ward 8 Warm space £1,104.00
Kinross Men's Shed  Warm space £1,500.00
Broke not Broken  Warm packs £3,900.00
Kythe  Warm space £3,200.00
Aero Space Kinross  Warm space £400.00
Glenfarg Community Centre  Warm space £2,640.00
Tabernacle Hall  Warm space £1,100.00
Millbridge Hall Warm space £500.00
TOTAL £21,714.00 
Ward 9 – Almond & Earn
Group Project Funding 
Dunbarney & Forgandenny Parish
Church
Warm space £7,294.00
Forgandenny Village Hall warm space £600.00
Oudenarde Community Cabin Warm packs £2,500.00
Social Flock Ward 9 Warm clothing packs  £1,445.00
Methven Arms Hotel - Community
Hub 
Warm space £5,170.00
TOTAL £17,009.00 
Page 154 of 232

Page 155

Ward 10 – Perth City South 
Group Project Funding 
Social Flock Ward 10 Warm clothing packs £2,045.00
Letham4All Ward 10 Warm space £3,150.00
TOTAL £5610.00 
Ward 11 – Perth City North
Group Project Funding 
Tulloch Net  Warm space £2,900.00
Letham 4 All (Anchor Group) Ward 11  Warm space £6,900.00
Letham 4 All Ward 11 Warm space £4,365.90
Social Flock Ward 11 Warm clothing packs  £2,337.10
Families Empowering Communities
(Letham Community Flat)
Warm space £2,006.00
Perth College Development Trust Warm space / food  £3,228.00
TOTAL £21,737.00 
Ward 12 – Perth City Centre
Group Project Funding 
North Muirton Community Centre Warm space  £3,400.00
Bridgend Gannochy & Kinnoull CC  Warm space £2,500.00
Scottish Fire & Rescue Service -
Community Action 
Warm packs £1,000.00
YMCA Tayside   Warm space £3,850.00
CPK Libraries Ward 12 Warm space / Warm packs  £4,200.00
St Matthews Church Warm space £1,500.00
Health & Wellbeing Café   Warm space £650.00
Letham4All - Community Fridge North
Muirton
Warm space / Warm packs  £3,327.00
Bakja  Warm space £3,000.00
Perth Minorities Association Warm space £3,200.00
All Strong Scotland   Warm space £1,200.00
Perth Cathedral St Ninian's Warm space £1,540.00
Families Empowering Communities
(Muirton Community Flat)
Warm space £2,670.00
Services for Young People PKC  Warm space £400.00
Social Flock -  Ward 12 Warm clothing packs  £5,070.00
Bethany Christian Trust  Warm space £880.00
Perth Hope Hub  Warm space £2,137.50
Hillcrest Futures Warm space £649.50
TOTAL £41,174.00 
Page 155 of 232

Page 156

3. Food Security Fund 22/23 
Ward 1 – Carse of Gowrie
Group Project  Funding 
St Madoes and Kinfauns Parish
Church
Community fridge and freezer £4,155.00
TOTAL £4,155 
Ward 2 – Strathmore
Group Project Funding 
Kettins Community Hub Summer Family Fun Days £600.00
Acorns Forest Adventures Activities Club £2,865.00
Burrelton Community Hub Community Cookit Sessions £1,000.00
Alyth Food for Thought Easter Holiday Club £122.00
The Alyth Senior Citizen Lunch and
Socialising Club
Heat and Eat over the Winter 2022/23 £1,416.00
SCYD  £5,000.00
TOTAL £15,468 
Ward 3 – Blairgowrie & The Glens
Group Project Funding 
Rugrats Rattray Ongoing healthy snacks £350.00
Blairgowrie High School Gig on a Truck Catering £450.00
Blairgowrie & Rattray Football Club GoFitba £960.00
Blairgowrie & Rattray Development
Trust
Holiday Activity Lunches £760.60
Rattray & Kirkmichael Communities Rattray and Kirkmichael Cooking Sessions £400.00
Active Schools Rattray Junior Football Snacks £339.60
TOTAL £3,260.20 
Page 156 of 232

Page 157

Ward 4 – Highland
Group Project Funding
Pitlochry Wednesday Coffee Morning
Club
Summer Outing £380.00
Aberfeldy COS Breadalbane Community Larder £3,000.00
Atholl Centre Food Bank £20,820.00
Pitlochry & Moulin Climate Café Fruit Trees £180.00
Pitlochry Bowling Club Food £2,500.00
Aberfeldy- Feldy Roo Food £9,300.00
TOTAL £36180.00 
Ward 5 – Strathtay 
Group Project Funding   
TOTAL £0.00 
Ward 6 – Strathearn
Group Project Funding
Crieff Connexions Community Store £5,100.00
TOTAL £5,100 
Ward 7 – Strathallan
Group Project Funding
Auchterarder Parish Church 
Community Garden
Allotments £1,000.00
TOTAL £1,000 
Page 157 of 232

Page 158

Ward 8 – Kinross-shire
Group Project Funding 
Kinross After School Club 2022 Lunch club £5,060.00
Broke Not Broken Parent & Toddler Group  £2,200.00
Broke Not Broken Winter Warmers £5,200.00
Broke Not Broken Tuesday Trip Lunches £3,575.00
Broke Not Broken Supermarket Vouchers £31,080.00
TOTAL £47,115.00 
Ward 9 – Almond & Earn
Group Project Funding 
Dunbarney & Forgandenny Parish
Church 
Food £3,000.00
TOTAL £3,000 
Ward 10 – Perth City South 
Group Project Funding 
Perth Academy Family engagement food project and
warm room
£1,820.00
Inch View Primary School Community Café £500.00
TOTAL £2,320.00 
Ward 11 – Perth City North
Group Project Funding 
Letham4All Foodshare and Community Fridges £3,000.00
Letham4All Community Fridge Mini Hub - Freezer
and Food
£4,000.00
Letham4All Paypoint £10,000.00
Letham4All Community Fridge - Letham £16,815.87
Riverside Church Matha's Kitchen - Let's Not Waste It £200.00
Letham Community Sports Club Letham Comm £8,500.00
TOTAL £42,515.87 
Page 158 of 232

Page 159

Ward 12 – Perth City Centre
Group Project Funding 
Giraffe Giraffe Community Kitchen £30,000.00
Perth Grammar School  PGS Cluster Summer Club £525.00
North Church Congregation (SCIO
13014)
North Church - Mill Street Food Project £8,000.00
Perth Foodbank - Trussell Trust Perth Foodbank 22/23 £40,000.00
IDART Delicious Shoestrings £320.00
Perth Minorities Association Cost of Living Support £5,000.00
TOTAL £83,845.00 
4. Good Food Fund 23/24 
Ward 1 – Carse of Gowrie
Group Project  Funding 
St Madoes and Kinfauns Parish Church Youth Cookit & Boost Boxes £1,555.00
TOTAL £1555.00 
Ward 2 – Strathmore
Group Project Funding 
Kettins Community Hub Warm space £1,000.00
CAYAG - Coupar Angus Youth Activities
Group
Healthy Lifestyles £750.00
TOTAL £1,750.00 
Ward 3 – Blairgowrie & The Glens
Group Project Funding 
Kirkmichael Session House  Cooking Skills £1,620.00
TOTAL £1620.00 
Ward 4 – Highland
Group Project Funding
Highland Perthshire Plus Healthy Eating £3,800.00
The Pitlochry Garden Share  Open Kitchen  £720.00
Healthiest Town Aberfeldy  Various Healthy Eating £3,996.00
TOTAL £8516.00 
Ward 5 – Strathtay 
Group Project Funding
Stanley Development Trust  Stanley Soup Club £2,721.60
TOTAL £2721.60 
Page 159 of 232

Page 160

Ward 6 – Strathearn
Group Project Funding
Crieff Connexions  Recipe Cards and Packs £2,350.00
TOTAL £2350.00 
Ward 7 – Strathallan
Group Project Funding    
TOTAL £0.00 
Ward 8 – Kinross-shire
Group Project Funding 
Kinross After School Club  After School Healthy Eating £400.00
Little Robins Cookery Club  Cookery Club £1,000.00
KASC Cooks! After School Healthy Eating £2,312.50
TOTAL £3712.50 
Ward 9 – Almond & Earn
Group Project Funding 
TOTAL £0.00 
Ward 10 – Perth City South 
Group Project Funding 
ESOL Cooking Project  Cooking Project £200.00
TOTAL £200.00 
Ward 11 – Perth City North
Group Project Funding 
Letham4All Community Fridge £13,000
(funded from
anti-poverty
funding)
TOTAL £13,000.00 
Ward 12 – Perth City Centre
Group Project Funding 
Perthshire Welfare Society  Let’s Cook Healthier £1,560.00
Aberlour Children's Charity Batch Cooking Lessons £2,000.00
Letham4All   Various Cooking Skills £960.00
Giraffe Community Healthy Eating £4,000.00
Tayside Council on Alcohol  Healthy Cooking Classes £400.00
Culture Perth and Kinross Libraries  Grow and Cook Healthily £4,000.00
Community Cookit Community Cookit £100.00
Perth Foodbank - Trussell Trust Perth Foodbank £5,000.00
TOTAL £18,020.00 
Page 160 of 232

Page 161

PERTH AND KINROSS COUNCIL 
Housing and Social Wellbeing Committee Meeting 
29 November 2023 
5TH LOCAL CHILD POVERTY ACTION REPORT 
Report by Director Strategy, People and Resources
(Report No. 23/339) 
1. PURPOSE 
1.1 The Child Poverty (Scotland) Act 2017 requires Perth & Kinross Council and
NHS Tayside to publish a Local Child Poverty Action Report (LCPAR) each
year. This is the 5th report, and it presents an update on actions taken during
2022/23; the Child Poverty Action Plan for 23/24 and an update on progress
with the Child Poverty Delivery Plan for 2022 - 2026. 
1.2 The LCPAR was circulated to and approved by the Community Planning
Partnership on 5th October 2023 and was considered and endorsed by NHS
Tayside on 10th October 2023. 
2. RECOMMENDATIONS 
2.1 It is recommended that Housing & Social Wellbeing Committee: 
I. Note the report.
II. Confirm their continued commitment to the strategic aims set out in the
child poverty strategy:
a. To raise awareness about the causes and consequences of child
poverty
b. To foster social cohesion and reduce stigma surrounding poverty
for children and families
c. To reduce the negative effects of living in poverty for children and
families
d. To enable children and families to prepare themselves for a life free
from poverty
III. Re-affirm their commitment to the objectives of the Child Poverty
Delivery Plan 2022 – 2026 to work with NHS Tayside and the
Community Planning Partners to:
• Provide opportunities and support to enter, sustain and progress in
work (employability and skills, housing and economic opportunity,
connectivity and childcare)
• Maximise the support available to families to lead dignified lives
and meet their basic needs (person-centred support, social security
and income maximisation).
• Supporting the next generation to survive and thrive
8
Page 161 of 232

Page 162

• Deliver a one council, whole family, whole community approach to
connecting children and families to the help and support they need
to mitigate and move beyond poverty
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Introduction and context 
• Spotlight on Innovation
• Programme areas for action in 23/24 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 The most recent estimates for child poverty in Perth and Kinross assess that
5914 children (21.9%) are living in relative poverty.   This suggests that
mitigation measures taken during the Covid Pandemic had a significant effect
as poverty rates remained fairly stable between 2017 and 2022. We do not
however know what impact the cost-of-living crisis has had on children as this
data has not yet been gathered. 
4.2 Whilst no single service or agency has the power to end child poverty
there is much that we can do to make the lives and life chances of the 5914
children living in poverty, here in Perth and Kinross brighter and better. We
have considerable influence as a local authority and individual and collective
responsibility to use our influence to make a real and lasting difference. 
4.3 The structure and content of the LCPAR is different this year as the Scottish
Government refreshed their Guidance Notes. The Guidance Notes reminded
local authorities of their statutory duty to report on measures taken and
measures proposed to contribute to child poverty targets, maximise income
for pregnant women and families with children and to report on measures
taken for families whose income/expenditure is adversely affected because of
a family member’s protected characteristic.  This last requirement is new and
did not appear in the previous guidance notes and, like most local authorities
and Health Boards, we are not yet in a position to provide this information as
our data is not disaggregated on that basis. 
4.4 The LCPAR links to other work currently being undertaken to develop a wider
anti-poverty strategy for Perth and Kinross with our partners and to locate the
governance function for the wider strategy with the Anti-Poverty Task Force. 
4.5 The guidance notes requested that the LCPAR’s should have a clear strategic
focus and should be evidence based. There was a strong steer towards
reporting on innovation, learning, improvement and change. The need for
better co-ordination of efforts across housing, transport, childcare, physical
and mental health and development was also identified as being of
importance. The Guidance also called for the use of case studies which
highlighted the effectiveness of actions taken, and for linkages with GIRFEC
and Whole Family Wellbeing, the Promise and UNCRC. 
Page 162 of 232

Page 163

4.6 Perth and Kinross Council has an established Child Poverty Working Group
(CPWG) involving officers from Perth and Kinross Council and NHS Tayside.
The CPWG oversees the progress and delivery of actions within the LCPAR.
The establishment of the Anti-Poverty Task Force has strengthened
collaborative working with key partners and will provide independent oversight
of the work of the CPWG going forward. 
4.7 The latest iteration of the Children’s Scorecard referenced in the report,
measures our progress in tackling issues relating to child poverty and our
delivery on those areas which mattered to parents and families affected by
poverty. 
4.8 One of the key issues surfaced by the Lived experience of child poverty report
was the need for a systems design approach to be taken to deliver a One
Council, Whole Family, Whole Community approach to addressing child
poverty and connecting families to the help and support they need and want. 
4.9 This has led to the establishment of a Locality Multi-disciplinary team in
Highland Perthshire with the specific intention of mitigating rural poverty and
cost of living pressures. This approach (supported by the Improvement
Service) is also being followed in Letham and Coupar Angus. 
4.10 The Corporate Plan highlights tackling poverty as a strategic priority of the
Council. This contributes to delivering strategic outcomes: 
• children and young people grow safe, respected, well-educated, and
confident in their ability to realise their full potential
• people and businesses thrive in an inclusive and sustainable local
economy across Perth and Kinross.
4.11 These strategic outcomes will be achieved by: 
1. reducing the number of children living in poverty in Perth and Kinross
2. reducing the cost-of-living pressures for households in and at risk of
poverty
3. maximising income from benefit entitlement and concessions for
households
4. promoting and encouraging local employers to follow the principles of
the Scottish Government’s Fair Work Action Plan, including the real
Living Wage and Scottish Business Pledge
4.12 The Corporate Delivery Improvement Plan (CDIP) commits Perth and Kinross
Council to work with partners to develop a wider anti-poverty strategy, once
this is done, the LCPAR and strategic outcomes outlined above will become a
subsidiary document to the wider strategy. 
4.13 The Local Outcomes Improvement Plan (LOIP) has identified reducing
poverty as a  strategic priority and is seeking to deliver the following local
outcomes:
Page 163 of 232

Page 164

• levels of poverty in Perth and Kinross will remain below the national
average
• action on food insecurity is better co-ordinated across Perth and Kinross
• action on fuel poverty is better co-ordinated across Perth and Kinross
• increasing numbers of premises are offering free period products across
Perth and Kinross
4.14 The LCPAR reports on the many positive actions have been taken in the last
year to tackle child poverty and the cost-of-living crisis they include:
• £6.3M committed to supporting struggling families through the cost-of-
living crisis an increase of over £1M on previous year
• £420,000 allocated to support a cost-of-living strategy which supported
the opening of warm spaces within the community, distribution of warm
home packs, additional support for community food and other measures. 
• 78 parents are being supported to find work and 30 who are currently in
work are being supported to sustain employment or progress to better
paid/more skilled employment
• 86 jobs were created via Employer Recruitment Incentives (over the last
2 years)
• A new HGV/LGV training academy was established, and 39 participants
have now passed their HGV license with 36 gaining full time employment
• Both NHS Tayside and Perth and Kinross Council now have community
benefit gateways established to enable suppliers to add value to their
contracts by supporting the social economy. 
• 279 referrals were made to the Welfare Rights Team from the Family
Nurse Partnership, Health Visiting and Maternity Services. The average
financial gain for these referrals was £1,175.
• 926 tenants experiencing financial difficulties benefitted from income
maximisation delivered through the Financial Inclusion Project by Perth
CAB.
• The Housing Think Yes Fund of £30,000 enabled frontline workers to
respond quickly and effectively to support 167 tenants experiencing
financial difficulties.
• The Welfare Rights Team achieved a Client Financial Gain of £6.5million
in social security benefits. They administered PKCs Financial Insecurity
Fund which amounted to £520,000. 
• The Community Planning Partnership have developed a Town Centre
Action Plan for Coupar Angus with local residents. The Plan has a strong
focus on tackling poverty, removing the barriers to employment and
supporting mental health and wellbeing. 
• 7,700 school meals are provided each day take up for free school meals
now stands at 65% for Primary Schools and 45% for Secondary
Schools. 
• 258 children accessed support or services funded by the Community
Mental Health Fund between July and December 2022. 
4.15 The report spotlights examples of innovation providing information and case
studies on:
Page 164 of 232

Page 165

• The establishment of an Anti-Poverty Task Force for Perth and Kinross
• Community Wealth building work delivered by NHS Tayside 
• The development of the children’s scorecard
• Love Letham – giving young people a voice
• Cash First and the use of Paypoint
• Crisis prevention
• Cost of Living crisis response
5. PROPOSALS 
5.1 This report details work undertaken in 2022/23 in fulfilment of the 2022/23
Local Child Poverty Action Plan and sets out the Action Plan for 2023/24. 
5.2 The Local Child Poverty Action Plan for 2023/24 comprises workplans for each
of the 3 workstreams: 
Workstream 1 - Providing opportunities and support needed to enter, sustain,
and progress in work (employability and skills, housing, connectivity and
childcare, economic opportunity)
Workstream 2 - Maximising the support available to families to lead dignified
lives and meet their basic needs (person-centred support, social security, and
income maximisation)
Workstream 3 - Supporting the next generation to survive and thrive (next
generation). 
5.3 This work will be subject to independent scrutiny by the Anti-Poverty Task
Force who will provide additional expertise from across Perth and Kinross
which will inform the implementation, monitoring and evaluation of the Child
Poverty Delivery Plan and the development of annual Local Child Poverty
Action Plans. 
6. CONCLUSION   
6.1 We know that over 5914 children across Perth and Kinross are living in
poverty. The negative impacts of poverty cannot be underestimated, both in
the short and the longer term. This report sets out the Councils continued
commitment to tackling child poverty in the area. It demonstrates our
understanding of child poverty in Perth and Kinross, the key areas of focus
and the actions that we will continue to progress with our partners to ensure
that child poverty is minimised and that all of our children are supported to live
well.   
6.2 The LCPAR has been presented to NHS Tayside for their approval. The Child
Poverty Working Group will continue to oversee and monitor progress towards
delivery on commitments in the Child Poverty Action Plan 2023/2024 and will
report on the same to Perth and Kinross Council in the next LCPAR report in
September 2024. The Anti-Poverty Task Force will continue to provide
independent scrutiny of the implementation of the Local Child Poverty
Delivery Plan 2022- 2026 and each annual Child Poverty Action Plan. 
Page 165 of 232

Page 166

Author
Name  Designation Contact Details
Margaret Lynch  Child Poverty Project
Officer
01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Clare Mailer  Director – Strategy,
People and Resources 
6 November 2023 
APPENDICES 
• Appendix 1 -5th Local Child Poverty Action Plan 23/24 
Page 166 of 232

Page 167

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 Mitigating Child Poverty will address the following outcomes identified in the
Local Outcomes Improvement Plan by the Community Planning Partnership
Levels of poverty in Perth and Kinross will remain below the national average.
Action on food insecurity will be better co-ordinated in Perth and Kinross
increase numbers of premises will offer free period products across Perth and
Kinross. 
Corporate Plan 
1.2 Mitigating Child Poverty will:   
• address the following priorities in Perth and Kinross Council’s Corporate
Plan
• Tackling Poverty
• Children and young people grow up safe, respected, well-educated and
confident in their ability to realise their full potential
• People and businesses are increasingly able to prosper in a local
economy which supports low carbon ambitions and offers opportunities
for all. 
Page 167 of 232

Page 168

This will be achieved by: 
• Preventing and mitigating the impact of poverty for children living in
Perth and Kinross
• Mitigating the cost of living pressures for households experiencing or at 
risk of poverty
• Maximising income from benefit entitlement and concessions for
households
• Promoting and encouraging local employers to follow the principles of
the Scottish Government Fair Work Action Plan including the Real Living
Wage and Scottish Business Pledge. 
2. Resource Implications 
2.1 There are no resource implications arising from this report. 
3. Assessments 
Equality Impact Assessment   
  
3.1  Proposals that have been considered under the Corporate Equalities Impact
Assessment process (EqIA) are assessed as not relevant for EqIA.  
  
Strategic Environmental Assessment   
  
3.2  Proposals have been considered under the Act, and no further action is
required as it does not qualify as a PPS as defined by the Act and is therefore
exempt.   
  
Sustainability   
  
3.3  Not applicable.  
  
Legal and Governance  
  
3.4  Not applicable.  
  
Risk  
  
3.5  Tackling Poverty is an organisational priority and as such mitigating actions
are also monitored through the Council’s risk profile.   
4. Consultation 
Internal 
4.1 All relevant heads of service have been involved in the development of this
report. 
Page 168 of 232

Page 169

External 
4.2 Priority Families were involved via the research project undertaken by the
Scottish Poverty and Inequality Research Unit. NHS Tayside was involved in
the development of this report and the Community Planning Partnership will
also sign off on it. 
5. Communication 
5.1 None. 
2. BACKGROUND PAPERS 
2.1 None. 
Page 169 of 232

Page 170

Page 170 of 232

Page 171

Appendix 1 
Local Child Poverty
Action Report 
2022/23 and 
Local Child Poverty
Action Plan 2023/24  
8
Page 171 of 232

Page 172

2   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24 
Contents
Policy Context .............................................................................................................................................................................................................. 3
Context ......................................................................................................................................................................................................................... 4
Spotlight on .................................................................................................................................................................................................................. 9
Programme Areas for Action in 2023/24 ................................................................................................................................................................... 22
Other Important Developments Planned for 2023/24 .............................................................................................................................................. 29
Challenges .................................................................................................................................................................................................................. 29
Appendix 1 – Child Poverty Delivery Plan 2022-2026 ............................................................................................................................................... 30
Appendix 2 – Additional Data on Priority Families .................................................................................................................................................... 33
Appendix 3 – Links to Companion Publications ......................................................................................................................................................... 35 
Page 172 of 232

Page 173

This report has been jointly produced by Perth and Kinross Council
and NHS Tayside, it reflects the wider collaboration with our
Community Planning Partners and a deepening engagement with
our key stakeholder groups. 
It is our fifth Child Poverty Action Report and includes actions taken
to implement our Child Poverty Delivery Plan 2022-2026. 
It flows from the Perth and Kinross Corporate Plan 2022/23 -
2027/28 which has Tackling Poverty as a corporate priority and the
Perth and Kinross Community Plan 2022-2032 adopted by our
Community Planning Partners which sets Reducing Poverty as a
strategic priority.
The Child Poverty Delivery Plan aligns with Best Start, Bright
Futures: tackling child poverty delivery plan of the Scottish
Government which covers the same period. It connects to and will
deliver a rights-based approach as set out in the UN Convention on
the Rights of the Child with reference to those articles which relate
to child poverty:
• Article 3 (best interests of the child)
• Article 6 (life, survival and development)
• Article 12 (respect for the views of the child)
• Article 26 (social security)
• Article 27 (adequate standard of living).
It is underpinned by GIRFEC (Getting It Right For Every Child) the
national approach in Scotland to improving outcomes and
supporting the wellbeing of children and young people by offering
the right help at the right time. It supports children and their
parents to work in partnership with the services that can help
them. The GIRFEC approach is child-focussed and uses the
SHANARRI wellbeing indicators, to identify need and measure
progress. 
It also aligns with the Scottish Government’s No One Left Behind
approach to employability support. In particular, the growing
emphasis on supporting parents into work, and to increase their
earnings in work.
It will contribute to the delivery of Scotland's Promise to care
experienced children and young people that they will grow up
loved, safe and respected and relates to the delivery of Plan 21-24
which requires organisations to demonstrate how they are ensuring
that they play a part in mitigating the impacts of poverty. 
Policy Context
Page 173 of 232

Page 174

4   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Perth and Kinross has the outward appearance of an affluent area.
We have only 3 data zones in the bottom decile of the Scottish
Index of Multiple Deprivation (SIMD) – Blairgowrie East (Rattray) –
03, Hillyland, Tulloch and Inveralmond – 01 and Muirton – 01. A
deeper dive into the data coupled with lived experience research
and the experiences of our frontline services paints a different
picture with areas of severe poverty and deprivation that we need
to tackle.
The powerful testimony of people with direct experience of poverty
led us to an understanding that "intense poverty exists in Perth and
Kinross" and that “it restricts the life chances and opportunities of
those who experience it." The report on "Child Poverty in Perth and
Kinross" by the Scottish Poverty and Inequality Research Unit and
the Poverty Alliance galvanised the Community Planning
Partnership, Perth and Kinross Council and NHS Tayside to make
tackling poverty a key priority. 
The real extent of poverty is masked by 3 things: 
• Poverty is stigmatised and it is difficult for people to be
open about the fact that this is a challenge that they face. 
• The Scottish Index of Multiple Deprivation, used as a proxy
for measuring poverty, identifies deprived areas, not
people. It is not good at identifying poverty where it is
dispersed such as in rural areas like Perth and Kinross. 
• The over-reliance on income-based measures which do not
take account of the higher cost of living in rural areas. The
Scottish Government's report "Poverty in Rural Scotland"
found that many rural households were at risk of poverty
due to their high expenditure on travel, food and fuel. 
Context
Page 174 of 232

Page 175

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   5 
The Poverty Threshold (before housing costs) is 60% of median
earnings – equivalised by family type and size. 
The UK Minimum Income Standard (MIS) Report 2022 provides an
income calculator which can be used to identify the income level
which different family types need to attain to secure an acceptable
standard of living. These figures were then uprated to give an
approximation of where the MIS rested for different family types in
rural Perthshire. 
The most recent estimates for child poverty in Perth and Kinross
assess that 5,914 children (21.9%) are living in relative poverty. 
21.9%
5,914 children
are living in 
relative poverty 
This suggests that mitigation measures taken during the COVID-19
pandemic had a significant effect as poverty rates have remained
fairly stable between 2017 and 2022. Further information is
available here. We do not yet know what impact the Cost-of-Living
Crisis will have had on children as this data has not yet been
gathered. 
Couple with 2
children
UK Government
Poverty Threshold
£29,588 
MIS UK £51,998 
Lone parent
with 2 children
UK Government
Poverty Threshold
£23,192 
MIS UK £62,277 
Page 175 of 232

Page 176

6   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
This year’s Measuring Poverty Report which is included in the
Children's Scorecard 2021/2022 highlights  some positive
movements:
• The number and percentage of employees across Perth and
Kinross earning less than the Real Living Wage as defined by
the Real Living Wage Foundation has significantly reduced
(13,000 in 2019/20 to 8,000 in 2021/22).
• There has been a slight reduction in job density, meaning
fewer people are chasing available jobs (0.77 in 2019/20
and 0.84 in 2021/22).
• Median earnings increased by 8.8% in the last year; this
would have enhanced the ability of families to cope with the
Cost-of-Living Crisis where inflation reached 10.4%.
However, there are areas for ongoing concern:
• There has been little movement on the gender pay gap (13%
in 2019 and 14% in 2022).
• Private sector rents increased by 26% over 3 years (2019/20
– 2020/21 and 2021/22) compared with a 9.6% increase in
local authority rents over the same period.
• The number of workless households increased significantly
during the COVID-19 pandemic and is still 10% above the
pre-COVID-19 rate (4,000 in 2019/20 and 4,400 in 2021/22).
• There has been a significant increase in payments from
Scottish Welfare Fund which is an indicator of ongoing
financial stress (£342,463 in 2019/20 and £460,834 in
2021/22).
(All of the above data relates to Perth and Kinross only and
not Scotland as a whole). 
The Measuring Poverty report included in the Children’s
Scorecard is incomplete as some of the statistics that we
would normally use to measure child poverty are not
available as COVID-19 and subsequent lockdowns have
disrupted the collection of data. The data that is available in
the main was collected before the impact of the Cost-of-
Living Crisis was felt and is therefore slightly out of date.
Page 176 of 232

Page 177

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   7
Deepening Poverty for Some
There are different levels of poverty experienced by people: 
• Just above the poverty line – this includes households that
are between 60% of the median income (the poverty line)
and 70% of the median. 
• Just below the poverty line – this includes households that
are below the poverty line (60% of the median income) but
above 50% of the median income. 
• Deep but not very deep poverty – this includes households
below 50% of the median income but above 40%. 
• Very deep poverty – this includes households below 40% of
the median income.
Local figures for Perth and Kinross for deep poverty and very deep
poverty do not exist, however the Joseph Rowntree Foundation
produced the following estimates for us based on their research:
• 2,600 children in deep but not very deep poverty.
• 2,600 children in very deep poverty. 
Page 177 of 232

Page 178

8   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
ACORN Data
Aside from those who are experiencing relative poverty, the ACORN
data for Perth and Kinross reports at household level. As there is an
average of 2.21 persons per household for Perth and Kinross 
(based on 2018 data), it is likely that the number of people who are
struggling financially stands at around 58,000 – or 1 in 3 of those
living in Perth and Kinross. 
Total %
Affluent Achievers 21,572 31%
Rising Prosperity 2,728 4%
Comfortable
Communities
20,017 29%
Financially Stretched 16,860 24%
Urban Adversity 7,783 11%
Ward Level Data
At this stage we can only provide Ward level data for children in
relative poverty – before housing costs. Therefore, this is an
underestimate of the actual numbers of children in poverty. It does
however provide a useful means of comparing one Ward with
another in terms of prevalence. In previous years percentages have
been provided, but these are not currently available for 2022. 
Page 178 of 232

Page 179

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   9
Spotlight on
Anti-Poverty Taskforce
The Anti-Poverty Taskforce was born out of a need to provide a
more co-ordinated and cohesive response to protect the most
vulnerable citizens of Perth and Kinross. It was established to
leverage expertise from across Perth and Kinross and beyond to
engage and inspire collective ownership and commitment to
mitigating the worst effects of the cost-of-living crisis in the short-
term and mitigate the longer-term effects of poverty within Perth
and Kinross.
The Anti-Poverty Taskforce provides independent active leadership
and support for cross-sector collaboration and action to help those
most affected by poverty and the Cost-of-Living Crisis. By drawing
upon expertise from across the area the Taskforce  offers
meaningful support to those experiencing poverty and most at risk
from rising costs. It also provides a co-ordinating focal point for all
the current activities aimed at reducing inequalities – child poverty,
fuel poverty, food supply, and the rural poverty premium.
The Taskforce membership is drawn from elected members, third
sector partners, Police Scotland, NHS Tayside, PKAVS, Citizens
Advice, GrowBiz, supported by Council officers and with expert
advice from Professor John McKendrick at SPIRU (Scottish Poverty
and Inequality Research Unit). A dedicated project manager has
been recruited to provide support to the Taskforce, funded by
Perth and Kinross Council but managed through our partners in
Giraffe.
So far, the Taskforce has:
• facilitated direct connections to a large range of
organisations offering support and assistance
• co-ordinated an approach to Cash 1st with Perth CAB
securing funding from the Trussell Trust to develop a Cash-
First partnership
• facilitated the expansion of the Perth Gift Card for use in
local supermarkets to enable a Cash-First approach to be
broadened
• co-ordinated a multi-agency approach and communications
in response to the Cost-of-Living Crisis and in particular
winter planning arrangements
Ongoing work includes:
• contributing to the development of a Perth and Kinross
Anti-Poverty Strategy, co-produced with all key stakeholders
Page 179 of 232

Page 180

10   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
• facilitating discussions with Stagecoach and the Trussell
Trust to provide free bus travel to foodbanks
• developing a scheme for the disposal of Council minibuses
to local community groups to facilitate better transport
links, especially in our remote and rural communities
Community wealth building – NHS Tayside
as an anchor institute
NHS Tayside is the largest Anchor Institute in the local region of
Tayside and as such recognises the significant opportunities this
presents and its part to play in improving not only the health of its
population but in also supporting the region’s social and economic
development. 
Examples of current completed actions and work in progress
include:
As an employer
• Full implementation and accreditation of the “Real Living
Wage”.
• Being a Disability Confident Employer providing links with
employability programmes and guaranteed interviews.
• Work to increase visibility in different sectors of population
through promotion of jobs at careers fairs and schools etc.
• Partnership working with colleges and encouraging uptake
of foundational apprenticeships through a current pilot in
six schools within Tayside.
• Continuing support of healthy working lives initiatives and
staff wellbeing programmes alongside promotion and
ongoing enhancement of flexible working policies.
As a mass procurer of goods and services 
• Full implementation and accreditation of the “Real Living
Wage” for all contracts.
• Increasing % of total spend with local suppliers (currently
35% is local to Tayside).
• Meet the buyers’ events, procurement surgeries and
providing coaching on Social Value (SV).
• Development and promotion of NHS Community Benefits
Gateway to local community groups.
• Ensure apprentice numbers on contracts are advocated and
adhered to.
• Work to understand where the current gaps in recruitment
are and utilise the opportunities to include a requirement in
Page 180 of 232

Page 181

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   11
construction contracts to encourage employment for long-
term unemployed; utilising links with Local Employability
Partnerships and the meet the supplier events.
NHS Tayside’s position as an Anchor Institute will encourage other
organisations to reducing health inequalities associated with
poverty. 
Children’s Scorecard 
PKC commissioned research on the lived experience of Priority
Families experiencing poverty in Perth and Kinross. The research
was conducted by the Poverty Alliance and the Scottish Poverty and
Inequality Research Unit at Glasgow Caledonian University. Families
told us how poverty impacted on their lives and how they
experienced our services. Families were asked what services they
needed and what services could do differently or better to meet
their needs. 
The areas of most concern to families were:
• support for mental health and wellbeing
• stigma and dignity
• crisis support
• access to good quality, affordable housing
• for schools to provide information about what help was
available and improve the quality of school meals
• affordable, flexible childcare and after school provision to
support parental employment
• affordable transport 
(More detail on these issues can be found in the Children’s
Scorecard linked above.)
Page 181 of 232

Page 182

12   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
The research was shared with Perth and Kinross Council’s Services –
and was used to determine which indicators were required to
measure how well Services respond to meet needs.
The  Children’s Scorecard was developed as a means of reporting
on progress and identifying areas of improvement. 
The first Children’s Scorecard laid the baseline – and in 2022 the
second Children’s Scorecard was signed off. It showed that progress
had been made in most of the areas identified by Priority Parents –
but it also identified those areas where further work is required.
These have now been factored into ongoing workplans and will be
addressed in the coming year.
The Children’s Scorecard for priority parents has:
• created a focal point for discussion with services which
centres on what parents need – and enables the Services to
factor this into their Service Improvement Plans
• identified gaps in provision and to move resources to those
areas of most importance to parents
• enabled us to measure how well we are responding to the
concerns raised by parents
A review of the Children’s Scorecard identified areas of
improvement which we will address in the coming year.
• We will close the time lag between gathering and reporting
on the performance information – we will do this by aligning
with the Council’s Improvement Planning process and the
LCPAR (Local Child Poverty Action Report) reporting cycle.
• We will embed consultation with Priority Families in the
wider stakeholder engagement and consultations
undertaken by the services and ensure that the Children’s
Scorecard areas of focus are updated accordingly. 
NHS Tayside Community Benefit Gateway
A Community Benefit Gateway has been established by NHS
Tayside as part of its broader role as an economic anchor
institution. Ongoing work through NHS Tayside procurement
processes have encouraged local suppliers to register and use the
portal – 60 new suppliers signed up in the last quarter of 2022/23 –
bringing supplier sign-ups on the system to 244. 
Click here to access the NHS Community Benefits Portal.
Perth and Kinross Council is also working with communities and
businesses to achieve social value from the money we spend. We
include Community Benefit Clauses in as many of our contracts as
possible. For more information on what this has delivered click here
to access the community benefits map.
Page 182 of 232

Page 183

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   13
Payments to Foster and Kinship Carers
Perth and Kinross Council increased weekly payments to foster and
kinship carers by 3%. A Cost-of-Living Crisis payment of £400 per
child in foster or kinship care or £300 per young person in
Continuing Care was provided to 192 families to help with
additional food and fuel costs last winter.
NHS Tayside Cost of Living Staff Task Group 
A Cost-of-Living Staff Group was set up by NHS Tayside in June
2022. Members from staff groups across the organisation are
represented and the group is jointly chaired by a member of the
Workforce Directorate and Staff-side (Trade Union). The Cost-of-
Living Staff group has developed new resources for staff such as a
Cost-of Living Support directory and they have arranged and
promoted awareness sessions delivered by various agencies for
staff to attend such as Money Helper awareness session, Save
Energy at Home and Focus on Finances sessions.
Giving Young People a Voice - Letham 
Love Letham is a collaboration between the Wellbeing Economy
Alliance Scotland and Perth and Kinross Council. It is a pioneering
project bringing together children, young people, families, residents
and senior representatives from Perth and Kinross Council to co-
create plans to make Letham the best place for children to grow up.
What we did
• Hundreds of children, young people and families shared
what wellbeing means to them.
• Diverse commissions of primary aged children, young
people, local adults and decision makers were recruited.
• Commissioners analysed data, developed a shared vision
and made recommendations.
Page 183 of 232

Page 184

14   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
The Love Letham Commission comprised 3 distinct groups to
provide appropriate spaces for people to work with peers before
collaborating more widely.
Each school Commission was given £500 for their time that they
could spend on something which would boost wellbeing at their
school. Young people fed back that they preferred to work without
adults and then share what they came up with.
The issues raised were broad – and poverty-related issues featured
amongst those that young people wanted to see addressed. Young
people’s focus on safety, decent homes and mental health support
was echoed by adults. 
Concerns relating to poverty raised by young people
• People can’t afford good food.
• People don’t have enough money.
• Homelessness.
• Houses are overcrowded.
• Access to services.
• There is no doctor, nurse, health visitor or mental health
services in Letham.
• If you are disabled, it is hard to access everything.
• Spaces for young people to meet and spend time.
• Not enough public transport.
• Need more after school clubs.
What comes next?
Building on the experience of Love Letham, Perth and Kinross are
setting up a multi-disciplinary team of service providers from across
the Council and Community Planning Partners. They will be
empowered to respond to the unique needs of the area – and will
address the issues of concern raised by young people.
“We like having our opinions listened to and
valued.”
Member of the Inbetweeners Youth Group
“Children’s voices lead the whole process. We
kept going back to them to get more clarification
and test things with them. We believe this is more
meaningful than typical engagement processes
with children.” 
Commissioner
Page 184 of 232

Page 185

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   15
“We hope that Perth and Kinross Council will be
able to follow through quickly with simple things.
Making younger people part of the decision-
making process is an excellent way of beginning
this journey.” 
Elsa (20) and Linda (72) Commission members
Wraparound Care for Working Parents
The Pitlochry community was provided with Out of School Care
Services by a voluntary management committee. They reached out
to the Childcare Strategy Team as the service was at risk of closure.
A Pitlochry Wraparound Care pilot was agreed to provide
affordable, flexible childcare, before and after school and during
some of the school holidays.
Pitlochry WAC (Wraparound Care) currently provide childcare for
68 children from 45 families. The pilot has been extended to deliver
this service for the coming year ensuring families can access
dependable childcare that will allow them to sustain employment. 
Cash-First  
Letham4all is a local community anchor organisation and is the lead
organisation for a Cost-of-Living Crisis working group involving a
range of organisations including Perth and Kinross Council, third
sector organisations delivering services to vulnerable groups and
locally-based community service delivery organisations. 
Page 185 of 232

Page 186

16   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Aim
To identify new ways of delivering a Cash-First approach to support
people impacted by the Cost-of-Living Crisis and to deliver a faster
response to people needing emergency top-ups of utility cards. 
Challenges
• Governance around cash handovers.
• Concerns around storing and accessing cash in office
premises.
• Time taken to process support, especially in relation to
emergency pay-as-you-go utility top-ups, keys and cards.
• Concerns around issues relating to dignity, lack of personal
choice and confidentiality in the community.
Problems Encountered
Very few charities use the PayPoint System and as a result it took
longer than anticipated to complete the installation of the PayPoint
service. As a stopgap measure the group purchased a supply of
MicroNEX Perth Cards. These were used at participating shops as a
pre-paid Mastercard and enabled people to purchase anything
from food, clothing, fuel and utilities. 
PayPoint
Letham4all received some funding from Perth and Kinross Council
to install a PayPoint System. The process involves:
• obtaining the service user’s name and mobile phone
number
• sending a unique code to the service user’s mobile phone
This can be used by the service user at any PayPoint store to top up
a utility card, pay a bill or receive cash.
Installing PayPoint cost £10,000 and there is an ongoing annual cost
of £7,500 in addition to a charge of £1.50 for each transaction. 
The Perth Card cost the face value of the card and the staff time
involved in handing out or delivering the card to the service user. 
Use of the PayPoint system reduced staff time taken to access and
process a cash payment.  
“It eliminated the need for staff to go with the
tenant to top up the card or key. It is less intrusive
to those who have received it and doesn’t feel as
though staff are micromanaging the situation.”
Page 186 of 232

Page 187

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   17
Amounts paid out were small – from £20 to £45. Over a 3-month
period, 27 payments were made. Letham4all saved an estimated
£32.70 per transaction as a result of reducing the staff time
involved in processing payments. 
85 Perth Cards with a value of £30 were distributed by Letham4all
enabling those who were experiencing financial crisis to get
immediate help to tide them over until the service user could be
signposted to Welfare Rights, Perth CAB or other support
organisation. 
“We have been able to offer immediate support
which alleviates stress to parents and their
children. There is no stigma attached to this type
of payment. Anecdotally we have been told of the
relief that people feel at being given these
relatively small amounts of money to tide them
over in a financial crisis, preventing things getting
worse in relation to their own mental health and
being able to provide the basic necessities for
those they care for is really important.”
“We are able to help someone who is having an
emergency out with the opening hours of the
Community Fridge and local foodbank. And it
offers personal choice and dignity in the process.”
Next Steps
Perth and Kinross Council and Letham4all are interested in a test of
change project to see if the PayPoint System can be scaled up and
delivered across Perth and Kinross. This could be of assistance in
rural areas where access to community larders and foodbanks is
hampered by transport availability and cost. 
Crisis Prevention – A Belt and Braces
Approach
Households can access our local Financial Insecurity Fund (FIF) if
they agree to a welfare benefits check. This ensures that
households are receiving their full UKG entitlements. The Welfare
Rights Team ensures that households are receiving their full
entitlements so that they are better equipped, financially, to cover
their ongoing costs of living. Once this is done, the families’
situation is reviewed, and payments can then be made if the
household fits the eligibility criteria with a view to preventing crisis
Page 187 of 232

Page 188

18   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
at a future date. The process has minimal ask of customers in terms
of evidence due to the access we have to statutory information.
NRPF (No Recourse to Public Funds) Crisis Grants
There is no comprehensive benefit check for these cases as there is
no recourse to public funds. We routinely make onward referrals to
the Ethnic Minority Law Centre for these households, many of
whom are EEA Nationals with no status.
Child Poverty, Debts and Rural Poverty
The FIF targets low-income households, Priority Family Groups and
people with protected characteristics.
The Fund includes one-off rural hardship payments and other
payments which assist with the cost of oil/gas/solid fuel which
requires large, upfront payment. The Fund can also assist with
priority debts such as rent, Council Tax, energy, school dinner and
broadband debt.
Added Value
Households do not need to be in crisis to access the FIF therefore it
is preventative.
Help with priority debts can:
• prevent or remove the costs attached to diligence
• prevent sequestrations
• replace some provision that Welfare Reform removed
(Discretionary Housing Payments in respect of Council Tax)
• prevent the need for Money/Debt advice thus protecting
Partners valuable resources
• address the issue of school dinner debt which SG later
included in their priorities and issued best practice
• act as a powerful incentive to households to have a benefit
check (win-win) which reduces the need for crisis assistance
later 
Effective partnership working with the Child Protection Team,
Community Safety, HSCP (Health and Social Care Partnership) and
Health colleagues to prevent risks to children and adults and
contributes to prevention and detection of crime, of which we have
some examples.
Partnership Working
Pink Saltire/Perth Welfare Society/Gypsy/Traveller Community
Groups
We worked closely with Pink Saltire, Gypsy/Traveller Community
Groups and Perth Welfare Society to provide funding to them so
Page 188 of 232

Page 189

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   19
that they could provide grants, with one-off funding, to households
in their communities that found barriers to accessing mainstream
assistance. We are working with the Equalities Team and these
groups to establish what would best meet their needs and how
services should be delivered to meet those.
Working with schools
We have a referral agreement in place with schools and Community
Link Workers Families on a low-income are awarded grants to
contribute to the cost of clothing for school-age children.
Aberlour – Tayside Hardship Project
The three Tayside Councils work in Partnership with Aberlour to
provide an enhanced welfare rights service to families with children
on the edge of care. Almost all of the families have debt situations
and we have been able to assist over 20 families.
Testimonials from Aberlour:
Feedback from two Aberlour families:
“It’s been the best thing anyone has ever done for
me.”
“I feel much more confident that I can manage my
own money better now and I know what to do in
the future if I have a problem.”
Breakdown of FIF payments 2023/24
A breakdown of the payments made direct to people’s pockets can
be found in the Welfare Rights Team Annual Report 2022/23 -
Payment Schemes - Perth & Kinross Council (pkc.gov.uk) and in
addition, Pink Saltire was allocated £15K to distribute grants and
Perth Welfare Society was allocated £10K to distribute grants to the
people in their communities.
The FIF goes beyond signposting, advice and information; it is
practical help at a point in time and at the first point of contact. It is
an example of one of the most holistic ways of working. It is
preventative and it also gives a bit of hope to households. If
entitlements are in place and if debts are removed, reduced or
more manageable then the overall stress for low-income
households, most of whom may have multiple stressors, reduces
and people feel that wee bit more able to cope.
Page 189 of 232

Page 190

20   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Cost-of-Living Crisis Response
A Cost-of-Living Crisis group was convened by Letham4all, a local
community anchor organisation. The group comprised participants
from Perth and Kinross Council (Chief Executive’s Service, Housing,
and Education and Children’s Services), Police Scotland, NHS
Tayside, Church of Scotland, Baptist Church, Aberlour, Remploy,
Penumbra, Perth Welfare Society, and Homestart. Membership of
the group varied between July 2022 and April 2023. 
The group identified the need for a community-based response to
the Cost-of-Living Crisis which spanned the provision of advice,
warm spaces, community food, warm home packs and emergency
Cash-First payments. 
Partly in response to this group’s feedback, the Council prepared a
Cost-of-Living Crisis Strategy which was fast tracked for approval in
September by Perth and Kinross Council who provided an initial
funding package of £320,000 which was later augmented by a
further £100,000. The fund opened in October 2022 and closed in
January 2023 when all funds had been allocated. 
120 community organisations were involved in delivering warm
spaces, warm home packs and community food. Signposting to
other services and support was available at all locations. 
A Reflective Practice Day is planned for September 2023 to capture
lessons learned and propose actions to be taken this winter. 
“There was a real benefit to people knowing that
lunch would be provided, and their heating didn’t
need to be on until the evening – it saved money
and worry.” 
St Columba’s Episcopal Church
“2 people found employment through engaging in
the warm space. People were able to come
together and found friendship and support.” 
Rannoch Community Trust 
“I have been attending the warm space from the
very start, it gives me so much. Not only does it
reduce my costs, but I find myself being part of a
group that is very friendly.” 
Anonymous Beneficiary
Page 190 of 232

Page 191

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   21
“Bringing my kids and letting them play games
while I speak to others gives me a very big break. I
feel I don’t need to ask the common questions
such as is the food halal? Thank you very much.”
Anonymous Beneficiary
“The warm space has been a lifeline for many. We
recently received over 30 people from the Sri
Lankan community. We always ask how they
found out about the warm space – the answer is
varied – social media, PKC website and word of
mouth. Daily we are serving a minimum of 50
people.”
Perth Welfare Society  
Page 191 of 232

Page 192

22   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Work – Support parents to enter, sustain
and progress in work
• Support parents into employment which pays the Real
Living Wage or more.
• Take action to close the gender employment and pay gaps.
• Address the challenges presented by rurality.
Improvement Required
• Greater engagement with business and the private sector.
To support the need to take effective action to help parents
into employment that pays the Real Living Wage and close
the gender employment and pay gaps. 
• Ensuring our investment in economic development delivers
inclusive growth that benefits all in our communities and
delivers economic opportunities for groups and
communities which are currently experiencing
disadvantage.
• Join up action to deliver access to affordable housing,
transport and childcare to support parents into work.
• Remove the barriers to employment for parents and those
living in rural and remote rural areas.
Partners
Anti-Poverty Taskforce, Perth and Kinross Council, NHS Tayside,
GrowBiz, other business partners to be identified.
Actions
• We will work with organisations such as the Business
Gateway, Chamber of Commerce, Federation of Small
Businesses and GrowBiz to champion the benefits of paying
the Real Living Wage and the Fair Work principles.  
• We will identify, and promote best practice on delivering
the Real Living Wage and embed this within our Economic
Wellbeing Strategy and ensure it features in Supplier
Development programmes.
• NHS Tayside will work with employability, procurement and
estates staff and partners to develop itself as an Anchor
Institute with the aim of using its strategic influence to
tackle poverty and health inequalities.
Programme Areas for Action in
2023/24
Page 192 of 232

Page 193

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   23
• Raise awareness about the Real Living Wage during
Challenge Poverty Week.
• Update Perth and Kinross Economic Wellbeing Strategy to
ensure investment is used to promote Fair Work, address
barriers to labour market participation, and creates
economic opportunity and investment in areas of
disadvantage.
• NHS Tayside will prioritise its role as an anchor employer
and will improve the interface with the Local Employability
Partnership to improve access to employment and
representation in the NHS workforce amongst people who
are care-experienced, carers, black and minority ethnic
groups including Gypsy Travellers, people living in the 20%
most deprived areas, disabled people and lone parents. 
• PKC will take the following actions to extend childcare
provision to support parental employment:
o expand the service redesign of Wrap Around Care to
provide flexible, affordable childcare packages 
o launch Community Childminding to support the most
vulnerable families
o increase uptake of strong start 2 places
• Support parents who wish to take-up self-employment as
childcare providers to gain the necessary skills and
qualifications to provide community-based childminding
services. 
• Ensure more joined-up partnership working between the
Council’s Employability services for parents, and teams
working to support parents through childcare and
educational initiatives.
• Make effective use of the additional £300K secured in the
Council budget from 2023/24 to provide additional support
to parents seeking to get into work or increase their earning
power in work.
• Make effective use of the Parental Employment Support
Fund to connect childcare, employability and transport
offers to remove barriers to employment for Priority
Parents.
• Work with the Local Employment Partnership and Network
to promote collaborative approaches to securing funding for
employability programmes which target Priority Parents. 
Page 193 of 232

Page 194

24   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Dignified Living – Maximise the support
available to families to lead dignified lives
and meet their basic needs
• Addressing the rural poverty premium.
• Addressing the needs of the Gypsy/Traveller and other
minority ethnic communities.
• Addressing stigma which prevents parents and families from
seeking support.
Improvement Required
Delivering a one-Council, whole-family, whole-community approach
requires us to develop and embed multidisciplinary, cross-
organisational working in our localities to connect children and
families to the help that they need and want.
We need to have a more systematic approach to targeting and
engaging with our Priority Families and those with Protected
Characteristics. 
Partners
Anti-Poverty Taskforce, Perth and Kinross Council, NHS Tayside,
Improvement Service, Perth CAB, Letham4all, community anchor
organisations, locality-based multidisciplinary teams (Highland
Perthshire, Coupar Angus, Letham) Perth Welfare Society.
Actions
• Using data-driven approaches which analyse socio-
economic data and data relating to the uptake of Council
concessions, plot gradients of unmet need to local schools. 
• Target income maximisation, employability offers and,
where possible, social prescribing to schools with the
greatest levels of unmet need associated with poverty and
inequality.
• Develop locality-based multidisciplinary, cross-
organisational teams who can support and connect parents
and families to services which take them beyond crisis
interventions to sustainable livelihoods. This will involve:
o formation of locality, multi-disciplinary, cross-
organisational teams 
o engagement with key stakeholders in local
communities including Priority Parents and people
with Protected Characteristics 
Page 194 of 232

Page 195

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   25
o mapping of local service provision across the public,
third and community sectors
o development of referral management processes and
software to support frontline workers and local
service managers to connect families to a broad
range of services covering crisis intervention, whole-
family health and wellbeing, housing, income
maximisation, debt management and employability
o delivery of training programmes to frontline workers
(Support and Connect) and Priority Parents (Building
Resilient Families) to enable them to support Priority
Parents to access the help and support they need to
move from crisis to sustainable livelihoods
o identification of local gaps in service provision and
development of local service footprints for those
services currently centrally delivered
o devolved budgets to support the development and
implementation of Locality Plans
• NHS Tayside will promote the Warmth Matters app and
website to enable frontline workers to signpost people to a
range of services and support across income maximisation,
debt and energy advice, mental health and wellbeing and
employability.
• Our Welfare Fund Team will work in partnership with Perth
Prison to provide an accelerated service to people on
release from prison as part of a wider voluntary throughcare
programme. 
• Our Welfare Rights and Welfare Fund Teams will provide
outreach at Perth and Glenochil prisons and to prisoners’
families. This will be a Scotland-first, no other Council has
ever provided Welfare Fund services within prison
establishments.
• Our Welfare Rights Team will work with Aberlour to
establish a Welfare Rights Academy to provide training on
welfare benefits and income maximisation across Perth and
Kinross. 
• Develop a joined-up approach to crisis intervention which is
underpinned by a Cash-First approach. This will involve:
o Perth and Kinross Council Welfare Rights and
Welfare Fund Teams will continue to deliver Cash-
First training to the frontline across Perth and
Kinross and work closely with foodbanks and
community groups to ensure that those accessing
food are first accessing statutory cash provision
o establishment of a Think Yes fund to enable frontline
workers to get quick emergency cash to children
Page 195 of 232

Page 196

26   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
o support Letham4all to make PayPoint System
available across Perth and Kinross to Support Cash-
First emergency payments of small amounts to tide
people over until benefits are received
o NHS Tayside staff will be provided opportunities to
access income maximisation services 
o The development of a new referral management
system (see above) which will be undertaken by
Perth CAB and rolled out across Perth and Kinross.
NHS Tayside will contribute to the development of
Cash-First approaches through networking, co-
delivery of training, sharing knowledge of services
and good practice. 
• NHS Tayside will increase the number of health placed
income maximisation referrals to welfare/energy advice
services. This will include new work with families where
children are severely disabled or have complex needs. We
will also focus on staff working in paediatrics to ensure they
can refer appropriately to connect families to help and
support. 
• Following a ‘Health in All Policies’ pilot with PKC Housing
Services, NHS Tayside and Public Health Scotland, NHS
Tayside will work with their local authority partners to
strengthen impact assessments around health inequalities
and poverty. 
(Link to report -  Health Inequalities Impact Assessment) 
Page 196 of 232

Page 197

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   27
Survive and Thrive – Supporting the next
generation to survive and thrive
• Closing the poverty-related attainment gap.
• Addressing the challenges faced by disabled young people
entering further and higher education and the jobs market.
• Addressing mental health and wellbeing issues for parents
and children affected by poverty.
Improvement Required
Recognition that children from more disadvantaged backgrounds have
not recovered from COVID-19 as readily as those from less
disadvantaged families. Address the challenges faced by disabled
children and young people, children with complex needs. The poverty-
related attainment gaps show a mixed picture, narrowing for P4 and
S3, but some areas widening at P1 and P7 and remaining largely static
for school leavers. Whilst children from more disadvantaged
backgrounds have performed more strongly than ever, those from less
disadvantaged families have improved slightly more, essentially
bouncing back more readily after the disruption from COVID-19.
Partners 
NHS Tayside and PKC (Education and Children’s Services)
NHS Tayside Actions
• We will enhance current links with CAHMS to provide
training on poverty sensitive practice and referring to
services for financial inclusion and cost-of-living support. 
• Our Public Health team with work with ECS to promote Cost
of the School Day resources.
PKC Actions
• We will work with partner organisations to put in place
robust referral pathways around mental health and
wellbeing support which parents can access on their own
behalf or on behalf of their children.
• We will work with our headteachers to maximise the impact
of PEF (Pupil Equity Fund) funding on children experiencing
educational disadvantage because of poverty. Education
and Children’s Services will ensure there is
o continued promotion of, and support to schools in
the delivery of, evidence-based interventions to
target aspects of literacy, numeracy and health and
wellbeing building upon our growing local evidence
base
o effective deployment of Scottish Government
Strategic Equity Funding in Perth and Kinross to
Page 197 of 232

Page 198

28   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
rigorously map, challenge and support school PEF
building upon existing structures and approaches
o development of the Closing the Gap Tool to create a
holistic planning and impact measurement tool
o regular reporting and analysis of progress to the
Raising Attainment Board
• We will develop and implement a refreshed Raising
Attainment Strategy for 2023-2026 reflecting our
unwavering commitment to achieving the highest outcomes
for all, especially those most disadvantaged by poverty. The
Raising Attainment Strategy 2023-2026 will set our
approach to ensuring that every child achieves:
o the highest standards in literacy and numeracy
o the right range of skills, qualifications and
achievements to succeed
• We will work in partnership with local community
organisations to provide School Holiday “Fuelled for Fun”
programmes to provide activities and food to school-age
children.
• We will work in partnership with Tayside Contracts to
increase the take-up of free school meals.
• Our Early Years and Childcare Service Team will develop
work with Gypsy Traveller families to support their child’s
development, expanding on the provision of starter sacks. 
• We will implement the Perth and Kinross Corporate
Parenting Plan 21-24. This will include:
o creating a Connections Plan for every looked after
child
o providing support and training for foster and kinship
carers around strengthening connections between
the child and those most important to them
o strengthening joint work between Children’s
Services and Criminal Justice Services to expand
programmes in the community to prevent and divert
young people away from offending behaviour
o using an opt-in model, providing all children aged 5+
with access to independent advocacy and
information on how to be supported by Children’s
Rights Lawyers
o using an opt-In model, providing independent
advocacy to families with children under the age of 5
o increasing support to the Young People with Care
Experience Groups  
Page 198 of 232

Page 199

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   29
NHS Tayside – Child Health Commissioner
A newly appointed dedicated, Child Health Commissioner to NHS
Tayside has a key role in the creation of policy, processes and
practice which will contribute to all children and young people’s
services across NHS Tayside. The Child Health Commissioner will
contribute to the strategic approach of tackling child poverty and
health inequalities.
1. We have not been able to report on services and support to
Priority Family Groups and those with Protected
Characteristics – outwith the “Fuelled for Fun” holiday food
programme. At present our services have no way to identify
priority families within the data we collect. In the next year,
we will commence discussions with key service providers on
how this disaggregated reporting might be achieved in
future years.
2. Information Governance and the requirements of the GDPR
(General Data Protection Regulation) legislation prevent us
from using Council and NHS held data to identify and target
specific families for support. There are also significant
information governance requirements involved in sharing
data. We have contributed to the Improvement Service’s
Rural, Remote and Island Child Poverty Network to raise and
address these concerns.
3. The Scottish Index of Multiple Deprivation, used as a proxy
for measuring poverty, identifies deprived areas, not
people. As Scottish Government distributes monies/funding
to local authorities based on SIMD data, this is problematic
for Perth and Kinross that has rural areas where poverty is
dispersed. 
Other Important Developments Planned for 2023/24
Challenges
Page 199 of 232

Page 200

30   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Strategic Aims
• To raise awareness about the causes and consequences of
child poverty.
• To foster social cohesion and reduce stigma surrounding
poverty for children and families.
• To reduce the negative effects of living in poverty for
children and families.
• To enable children and families to prepare themselves for a
life free from poverty.
Objectives
Work
Provide opportunities and support needed to enter, sustain and
progress in work 
(Employability and skills, housing and economic opportunity,
connectivity and childcare) 
Sharpening Focus
• Supporting parents into work that pays the Real Living Wage
or more.
• Taking action to close the gender employment and pay
gaps.
• Addressing the challenges presented by rurality.
Dignified Living 
Maximise the support available to families to lead dignified lives
and meet their basic needs.
(Person-centred support, social security and income maximisation)
Sharpening Focus
• Addressing the rural poverty premium.
• Addressing the needs of the Gypsy Traveller community and
other minority ethnic communities.
• Addressing stigma which prevents parents and families from
seeking help and support. 
Appendix 1 – Child Poverty Delivery Plan 2022-2026
Page 200 of 232

Page 201

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   31
Survive and Thrive 
Supporting the next generation to survive and thrive.
(Education and Children’s Services, Health and Social Care)
Sharpening Focus
• Closing the poverty-related attainment gap.
• Addressing the challenges faced by disabled young people
entering further and higher education and the jobs market.
• Addressing mental health and wellbeing issues for parents
and children affected by poverty.  
Page 201 of 232

Page 202

32   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Our Approach
Deliver a one-Council, whole-family, whole-community approach to
connecting children and families to the help and support they need
to mitigate and move beyond poverty. 
Sharpening Focus
• Changing the way we work to use data-driven approaches to
identify and connect with families affected by poverty.
• Offer no wrong door approaches to connecting families to
the help and support they need and want.
• Developing multidisciplinary, cross-organisational working in
teams at locality level to build inclusive communities which
strengthen the web of support on offer to families and
children affected by poverty. 
One Council – whole family – whole
community approach 
Multi-disciplinary teams – cross-organisational delivering key 
worker support to connect families to holistic help and support
Work
Support
parents into
employment
that pays the
Living Wage
Close gender
employment
and pay gaps
Address
barrers -
rurality
Dignified
living
Address rural
poverty
premium
Meet needs of
gypsy travellers
and minority
ethnic families
Challenge
stigma
Next
generation
Close
attainment
gap
Level
playing-field
for disabled
young
people
Mental
health and
wellbeing -
parents and
children
Page 202 of 232

Page 203

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   33
There is limited local data available on Priority Families. 
Lone Parents
There are approximately 
4,800 
lone parent families 
in Perth and Kinross1
Just over a third of families on
Universal Credit are headed by a
lone parent (31%) – 2,756 families in
all 2 
1 Stat-Xplore HHs on Universal Credit – Single Parents May 2023 
Disability
505 
households 
claiming Universal Credit claim
the Disabled Child Element1
16.5% 
of households
with children claiming
Universal Credit receive the
Carer Element2
2 Stat-Xplore – HHs on Universal Credit by Carer Element (Feb 2023)
Appendix 2 – Additional Data on Priority Families
Page 203 of 232

Page 204

34   |    Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24
Households with 3 or more children
There are 
705 families 
claiming Universal Credit who
have 3 or more children3 
Youngest Child Under 1
There are 
1,153 children 
under 1 year of age3
Mothers Under 25
No data available. 
Other information
5.8% 
of households 
with children claiming Universal Credit
receive the Childcare Element.
Only 219 families with children are claiming
the Childcare Element available on Universal
Credit.
3 Perth and Kinross Council Area Profile (nrscotland.gov.uk) National Records of
Scotland (Aug 2023)
Page 204 of 232

Page 205

Local Child Poverty Action Report 2022/23 and Local Child Poverty Action Plan 2023/24   |   35
Appendix 3 – Links to Companion Publications
Children's Scorecard
Local child poverty action report 22/23   
Page 205 of 232

Page 206

Page 206 of 232

Page 207

PERTH AND KINROSS COUNCIL 
Housing and Social Wellbeing Committee 
29 November 2023 
COMMUNITY INVESTMENT FUND 2023/24 
Report by Head of Culture & Communities Services 
(Report No. 23/340) 
1. PURPOSE 
1.1 This report informs Committee of the funding commitments made for the
2023/24 Community Investment Fund (CIF) across the 12 Council wards.
Ward Panels allocated approximately £385,000 to support 94 projects which
contribute to the delivery of the priorities outlined in the Council’s Corporate
Plan. The report also provides an update on progress with the Green Living
Fund Participatory Budgeting project 2023/24. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
i. notes the funding decisions taken by Ward Panels for 2023/24 CIF
ii. approves the carry forward of £85,530.76 for disbursal to community
grassroots projects in 2023/24 and 2024/25, for use in the wards where
the underspends have arisen.
iii. notes the progress made with the Green Living Fund Participatory
Budgeting project 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections:
• Section 4: Background
• Section 5: Applications 
• Section 6: Funding Decisions 
• Section 7: Conclusion 
4. BACKGROUND 
4.1 In 2018/19, the Council established a Community Investment Fund (CIF) as
part of its commitment to devolve more decisions to local communities. Since
then, a total of £2m has been distributed to approximately 400 community-led
projects. 
4.2 In March 2023, the Council approved £400,000 in addition to £68,677 CIF
underspend from 2022/2023 for a further round of Community Investment
Fund in 2023/24. This provided a total budget of £468,677.64 for CIF 2023/24.
The Council also approved a further £200,000 for a Participatory Budgeting
(PB) programme.
9
Page 207 of 232

Page 208

4.3 Report 23/194 set out the process for running CIF and PB in 2023/24. For CIF
the application process opened on 26 June and closed on Friday 18 August.
Ward Panels met throughout September to consider the applications and
agree any funding to be awarded. In Ward 8, the Kinross-shire Committee has
delegated authority over CIF funding and approved the Ward Panel’s
recommendations on 16 November 2023. 
4.4 CIF 2023/24 followed a similar process to previous rounds, with one major
change. Whereas previous rounds of CIF had followed a number of manual
steps from application through to the final award and project monitoring, this
round utilised an on-line portal through MyPKC. This meant that the
administration of CIF was contained on one system, including: 
• the submission and screening of applications, with the potential for
officers and applicants to make amendments or additions as necessary
• the assessment and scoring of applications by Ward Panel members
• the recording of decisions on funding awards by Ward Panels and
Kinross-shire Local Committee
• the issuing of award letters to successful applicants 
• the development of databases to allow for payment of grants
• the establishment of monitoring requirements for successful projects 
4.5 Feedback from officers is that the system has allowed for greater efficiency
and released capacity for them to complete other tasks. Feedback from
applicants and Ward Panel members has also been positive. 
5. CIF APPLICATIONS 
5.1 The number of applications received for CIF 2023/24 and the funding
requested is set out below. Compared to 2022/2023, there is a slight increase
in terms of the number of applications and the value of those applications. 
Ward Funding
Available
Number of
Applications
Funding
Requested
1 – Carse of Gowrie £37,662.70 5 £37,186.80
2 – Strathmore £53,907.24 9 £61,937.40
3 – Blairgowrie & The Glens £31,472.00 10 £37,341.99
4 – Highland £29,007.00 10 £51,262.00
5 – Strathtay  £33,517.00 11 £62,145.86
6 – Strathearn  £30,967.00 8 £41,627.89
7 – Strathallan  £50,650.47 12 £79,954.60
8 – Kinross-shire  £35,862.00 10 £39,555.98
9 – Almond & Earn £29,542.00 9 £68,741.00
10 – Perth City South  £45,878.41 5 £13,862.00
11 – Perth City North £41,273.41 4 £41,398.08
12 – Perth City Centre £48,938.41 15 £93,615.40
TOTALS £468,677.64 108 £628,629.00 
Page 208 of 232

Page 209

6. CIF FUNDING DECISIONS 
6.1 The following CIF funding decisions were made in each ward area, with
funding paid out to successful applicants in October: 
Ward 1 – Carse of Gowrie
Group Project  Funding 
Perthshire Woodcrafters  Provision of training for disabled
members/local community
£1,500.00
West Carse Public Hall  Renovation Phase 2  £4,000.00
St Madoes & Kinfauns Parish
Church 
Madoch Transport Infrastructure £5,700.00
Tayside Upcycling & Craft
Centre
Learn How to Upcycle  £5,220.00
Tay and Earn Trust  Keeping the Carse Active  £9,745.80
TOTAL £26,165.80 
Ward 2 – Strathmore
Group Project Funding 
Scone Thistle Junior Football
Club
Tractor and Finishing mower  £6,000.00
St Martins Public Hall Balbeggie Community Events  £1,800.00
Alyth Development Trust Alyth Resilience Ranger  £7,494.00
Kettins Community Hub Kettins Kids  £3,400.00
Guildtown Hall & Playing Fields
Association 
Guildtown Larder £2,723.40
Strathmore Community Hub  Coupar Angus Community Cinema £3,440.00 
Scone Airport Men's Shed  Scone Airport Men's Shed
Equipment Needs
£5,000.00
RDMI  Thermically efficient window
curtains 
£9,940.00 
Meigle & Ardler CDT Meigle & Ardler Community Shed £6,000.00 
TOTAL £45,797.40 
Page 209 of 232

Page 210

Ward 3 – Blairgowrie & The Glens
Group Project Funding 
Mount Blair Community
Development Trust
Mount Blair Emergency Resilience £1,500.00
Blairgowrie & Rattray
Community Football Trust 
The Free Football Project £5,901.00
SCYD GO Project  £5,870.00
Girlguiding Blairgowrie and
Rattray District
Girlguiding Blairgowrie and Rattray
District New Hall
£5,000.00
Blairgowrie & Rattray Access
Network
Wider Access for Path Network
Maintenance
£915.00
Wisecraft Scottish Mental Health First Aid @
Wisecraft
£2,740.00
Nest Creative Spaces CIC Delivery of Free Craft Workshops £2,950.00 
PLUS Perth & Kinross Green Shoots of Recovery £2,146.00 
Ballintuim Village Hall  Resilience Project £2,449.99 
Mantalk Mantalk Community Funday £2,000.00 
TOTAL £31,471.99 
Ward 4 – Highland
Group Project Funding
Upper Tay Anti-Poverty Support
Group 
Upper Tay Anti-Poverty Support
Group 
£5,000.00
Georgetown Hall Committee Georgetown Hall Upgrade  £3,307.00
Breathe Project  The Breathe Project  £5,000.00 
Highland Perthshire Yoga and
Wellbeing
Health for all £2,000.00
Highland Perthshire Plus  Highland Perthshire Plus Project
/Development Worker 
£5,000.00
Rannoch Community Trust  Health and Wellbeing Coordinator  £5,000.00
The Mindful Partnership Minding Highland Perthshire £2,700.00 
Breadalbane Men’s Shed Installation of Toilet / Social Area £1,000.00 
TOTAL £29,007.00 
Page 210 of 232

Page 211

Ward 5 – Strathtay 
Group Project Funding
DAB First Responders  Initial set up equipment for first
responders 
£5,532.00
St Columba's Episcopal Church,
Stanley
New Disabled Access Project £2,988.86
Bertha Park Residents  Bertha Park Parent and Pre-school
Group
£1,708.35
Bertha Park Residents  Bertha Park Youth Group  £1,962.27 
Chapelhill Hall  Badminton Club £165.00 
Chapelhill Hall  Cost of living crisis - hall electricity
costs 
£600.33
Meikleour Village Hall & Institute
Committee
Rear Grounds Repair and
Improvement
£3,480.00
Bertha Park Community Hub Bertha Park Community Youthwork £5,626.00 
Dunkeld, Birnam & District
Community Development Trust 
Community Wellness - Dunkeld &
Birnam
£3,640.00
The Chapter House Museum
Trust
Young Archaeologist Club £6,300.00
Y Centre Limited Y Move  £1,514.19 
TOTAL £33,517.00 
Ward 6 – Strathearn
Group Project Funding
Crieff Connexions  Crieff Connexions Social Space  £6,000.00 
Comrie Cinema and Events
Club
Children's Film Project £1,880.00
Nature Connects Perthshire CIC  Mindful Me £2,000.00
Richmond Community  Richmond Community Fellowship
Group
£6,035.89
Strathearn Arts  Art for Wellbeing £3,000.00 
Crieff at Christmas Switch on event and replacement
light display
£6,000.00
Logos Youth Voice Crieff  Logos Youth Voice £2,000.00 
TOTAL £26,915.89 
Page 211 of 232

Page 212

Ward 7 – Strathallan
Group Project Funding
54th Perthshire (Auchterarder)
Scouts 
Scout Hall Renovation  £13,411.00
Muthill Bowling Club Operation Mower  £6,000.00
Auchterarder & District Men's
Shed
Music Project  £1,200.00
Auchterarder Community Sports
and Recreation 
Auchterarder Public Park - Public
Convenience Project
£2,500.00
Auchterarder Community Sports
and Recreation 
ACSR Rackets £3,976.90
Rotary Club of Auchterarder &
District
Sandy Gunn Memorial Garden
Phase 2 
£9,400.00
Aberuthven Village Hall Trust Sustain Community Spirit £2,880.00 
Dunning Scout Group Expedition Trailer £6,586.51 
Dunning Community Council Portable PA system  £1,000.00 
Logos Youth Project  Logos Youth Voice Auchterarder £1,300.00 
Auchterarder Curling Club Auchterarder Curling Development  £1,600.00 
TOTAL £49,854.41 
Ward 8 – Kinross-shire
Group Project Funding 
Milnathort and Orwell Core
Paths Group
Core Path Flail £1,828.98
Kinross Bowling Club  Share Facilities of KBC with whole
Community (Installation of
Disability Ramps) 
£4,750.00
Glenfarg Community Transport
Group
Website Development  £3,000.00
Broke not Broken Infant Food Insecurity Project £4,800.00 
Aero Space Scientific
Educational Trust
Our World from Space £5,000.00
Kythe 12 month Programme of Activities £2,000.00 
Perth Autism Support  Outreach Activities  £4,047.00 
Kinross Centre  Ruby Anniversary £2,130.00 
TOTAL £27,555.98 
Page 212 of 232

Page 213

Ward 9 – Almond & Earn
Group Project Funding 
Forgandenny Village Hall  Black out blinds for Forgandenny
Village Hall
£1,000.00
66th Perthshire Scout Group Pavilion Renovations Phase 5 £1,750.00 
Y Centre Limited Y Move  £3,750.00 
Earn Community Council Supply & Fit Bus Shelter £2,000.00 
Green Shoots Community &
Learning Centre
Green Shoots Garden Playground £1,000.00
Friends of Abernethy Kirkyard Abernethy Kirkyard £500.00 
Methven Community Centre  Continual Improvement £2,000.00 
Oudenarde Community Cabin Oudenarde Community Events £3,000.00 
Bridge of Earn Amateur Football
Club
Victory Park Football Pitch
Maintenance and Winter Training
£4,000.00
Kythe 12 month Programme of Activities £3,000.00 
TOTAL £22,000.00 
Ward 10 – Perth City South 
Group Project Funding 
Craigie and Moncreiffe Parish
Church
Craigie Connect  £4,000.00
Perth Baptist Church Open Circle at Perth Baptist
Church
£5,000.00
Letham4all  @Moncreiffe £7,560.00 
Perth Parrots Floorball Club Perth Parrots Floorball Club - Sport
& Social Activity
£1,084.00
Moncreiffe Parent Council Educating Outdoors £11,877.00 
TOTAL £29,521.00 
Ward 11 – Perth City North
Group Project Funding 
Letham Climate Challenge Kingswell Allotment Shed £1,100.00 
Letham4all Repair, Re-use and Remake £3,802.00 
Mangin Manashee Winter Respite and Activities £7,500.00 
TOTAL £12,402.00 
Page 213 of 232

Page 214

Ward 12 – Perth City Centre
Group Project Funding 
Perth Minorities Association Empowering Social Spaces for All £3,500.00 
CATH On the mend £6,000.00 
All Strong Scotland  All Strong Recovery  £6,900.00 
ESOLPerth Primary English Language Club £7,780.00 
VisionPK Sensory Hub Project £5,000.00 
Mindspace Young People's Recovery College £8,887.00 
ESOLPerth New Scots English Language
Learning & Wellbeing
£4,800.00
Perth Sea Cadets  Better Enable Sea Cadets Perth to
help young people develop
£3,000.00
Bajka We can live together integration
events
£3,000.00
TOTAL £48,867.00 
6.2 The table below summarises the overall spend and confirms underspend of
over £3,000 in eight ward areas: 
Ward Funding
Available
Funding
Awarded
Underspend
1 – Carse of Gowrie £37,662.70 £26,165.80 £11,496.90
2 – Strathmore £53,907.24 £45,797.40 £8,109.84
3 – Blairgowrie & The Glens £31,472.00 £31,471.99 £0.01
4 – Highland £29,007.00 £29,007.00 -
5 – Strathtay  £33,517.00 £33,517.00 -
6 – Strathearn  £30,967.00 £26,915.89 £4,051.11
7 – Strathallan  £50,650.47 £49,854.41 £796.06
8 – Kinross-shire  £35,862.00 £27,555.98 £8,306.02
9 – Almond & Earn £29,542.00 £22,000.00 £7,542.00
Ward Funding
Available
Funding
Awarded
Underspend
10 – Perth City South £45,878.41 £29,521.00 £16,357.41
11 – Perth City North £41,273.41 £12,402.00 £28,871.41
12 – Perth City Centre £48,938.41 £48,867.00 £71.41
TOTALS £468,677.64 £383,075.47 £85,602.17 
6.3 Following the conclusion of this funding round, specific requests were made in
Ward 1 (Carse of Gowrie) and Ward 8 (Kinross-shire) to allow the
underspends (£11,496.90 in Ward 1 and £8,306.02 in Ward 8) to be made
available to bids from community groups in those Wards. As a result, the
application process was reopened for these Wards, with a closing date of 22
Page 214 of 232

Page 215

November. Ward Panels are due to assess these applications and make
decisions on any further funding awards in early December. 
6.4 It is recommended that the remaining underspends be ringfenced to support
future grassroots projects in each specific Ward. The current Transformation
Review of community engagement is considering ways to make the grant
application and monitoring process across various Council grant schemes
including any future version of CIF more streamlined and cost-efficient to
administer.   
7. GREEN LIVING FUND PARTICIPATORY BUDGETING PROJECT 
7.1 In March 2023, Councillors approved an allocation of £200,000 towards a
Participatory Budgeting (PB) project for 2023/24. The process for running the
Participatory Budgeting project was agreed through Report 23/194, with
agreement that the project would support community-led initiatives which
addressed climate change and cost of living. 
7.2 The PB project is being run in conjunction with Local Action Partnerships and
has been branded the “Green Living Fund” PB Project. The project will be
delivered as set out below: 
• Monday 30 October – open for bids from community groups
• Friday 15 December – close for bids from community groups
• January 2024 – screening process to check feasibility of bids
• February 2024 – voting opens to public for 2-3 week period
• w/c 26 February – Perth and Kinross event to announce winners 
7.3 The Green Living Fund PB Project is being hosted via the CONSUL platform,
with support from COSLA (Green Living Fund (communitychoices.scot)).
Bidders are required to demonstrate how their project will impact on one or
more of the themes listed below, whilst also demonstrating how it will support
local people with the cost of living.   
1. Energy – reducing consumption, energy saving, promoting efficiency
and use of renewables 
2. Transport – encouraging active travel, use of public transport and
decarbonising transport 
3. Waste – reducing waste, reusing and recycling
4. Resilience and Biodiversity – improving greenspace, biodiversity,
local food growing; mitigating/adapting to climate change; and
supporting community resilience and emergency projects
5. Engagement – increasing public awareness and engaging
communities 
7.4 Once the bidding process is concluded, officers will work with Local Action
Partnerships to ensure that those bids that go forward to the public vote are
feasible and reflect local needs and contexts. Voters will be presented with a
budget for the Local Action Partnership locality in which they live and be
Page 215 of 232

Page 216

allowed to vote for as few, or as many, projects as they wish until the budget
has been fully allocated. An event in Perth city centre is being organised for
the end of February where the results will be announced and further funding
support and advice for community groups will be available. 
7.5 A report will be brought to Housing & Social Wellbeing on 20 March 2024
summarising the delivery of the Green Living PB Project. 
8. CONCLUSION 
8.1 Community Investment Fund supports new and innovative community projects
that tackle inequalities and improve quality of life. This round of CIF has made
96 awards totalling £383,075.47 across Perth and Kinross, with two projects
being cross-boundary. Additional funding commitments may be made in Ward
1 (Carse of Gowrie) and Ward 8 (Kinross-shire) before the end of 2023. 
8.2 Work to deliver the Green Living Fund Participatory Budgeting project is
progressing, with groups currently submitting proposals for screening before a
final public vote in the first quarter of 2024. 
Authors
Name  Designation Contact Details
Lee Haxton 
David Stokoe 
Community Planning
Team Leader 
Service Manager -
Communities
lhaxton@pkc.gov.uk 
dstokoe@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
14 November 2023 
• APPENDICES - NONE 
Page 216 of 232

Page 217

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Local Outcomes Improvement Plan  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 Supporting and investing in community-led solutions to locally identified
issues contributes to the delivery of the Perth and Kinross Community Plan /
LOIP in terms of the following priorities: 
(i) Giving every child the best start in life
(ii) Developing educated, responsible and informed citizens
(iii) Promoting a prosperous, inclusive and sustainable economy
(iv) Supporting people to lead independent, healthy and active lives
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 Supporting and investing in community-led solutions to locally identified
issues contributes to the delivery of the Perth and Kinross Council Corporate
Plan in terms of the following priorities: 
(i) Giving every child the best start in life; 
(ii) Developing educated, responsible and informed citizens; 
(iii) Promoting a prosperous, inclusive and sustainable economy; 
(iv) Supporting people to lead independent, healthy and active lives; and 
(v) Creating a safe and sustainable place for future generations. 
Page 217 of 232

Page 218

2. Resource Implications 
Financial 
2.1 Community Investment Fund has a budget of £410,000 for 2022/23 and
funding decisions of £342,588.14 have been made, leaving an underspend of
£68,077.64. 
2.2  An additional £200,000 of funding was made available for a Participatory
Budgeting exercise to be run in conjunction with Local Action Partnerships. A
future report will set out how this funding has been used. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment Process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the Act.
However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council has a general duty to demonstrate its
commitment to sustainability and the community, environmental and
economic impacts of its actions. 
3.6 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report.   
Page 218 of 232

Page 219

4. Consultation 
Internal 
4.1 There has been consultation with the Finance Department, Communities and
the Executive Leadership Team. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to a material extent in preparing the above report. 
Page 219 of 232

Page 220

Page 220 of 232

Page 221

PERTH AND KINROSS COUNCIL 
Housing & Social Wellbeing Committee 
29 November 2023 
AFFORDABLE HOUSING MEMBER/OFFICER WORKING GROUP - OUTCOME
REPORT 
Report by Executive Director (Communities)
(Report No. 23/341) 
1. PURPOSE 
1.1 This report provides an overview and update to members on the work
progressed by the Affordable Housing Member Officers Working Group. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
(i) notes the work progressed by the Affordable Housing Member/Officer     
Working Group. 
(ii) approves that the purpose of the Affordable Housing Member/Officer 
Working Group has been met. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Overview 
• Section 5: Update on Progress
• Section 6: Conclusion
• Appendices 
4. OVERVIEW 
4.1 At the Perth & Kinross Council Committee meeting on 21 December 2022,
approval was given for the re-establishment of the Affordable Housing a
Member/Officer Working Group. It was agreed the Group would meet for a
maximum period of 6 months. 
4.2    Terms of Reference (appendix 1) was also agreed and covered the 
following areas to:   
• provide strategic leadership and direction on the priorities and delivery of
the Strategic Housing Investment Plan and all aspects of the provision of
affordable housing in Perth & Kinross.
10
Page 221 of 232

Page 222

• monitor the delivery of affordable housing targets (Council, RSL and
private developers) and their effectiveness in meeting the key strategic
priorities as agreed within the Local Housing Strategy.
• consider the financial issues arising from the provision of affordable
housing in relation to delivery, value for money and affordability to
tenants.
• respond to proposals, guidance and consultation papers on Housing and
Planning regarding the provision of affordable housing.
• consider best practice in the provision of affordable housing, focusing on
experience in other parts of the UK and in the European community. 
4.3 The Group was chaired by the Convener of the Housing and Social Wellbeing 
Committee and had representation from five Elected Members, including the
Provost, covering all political parties, the Executive Director (Communities),
the Senior Service Manager – Housing and the Housing and Strategy and
Policy Manager (Communities) with administrative support from Committee
Services. 
4.4 To support the Terms of Reference, a meetings topic and work plan was   
developed that covered nine areas of activity (Appendix 2). 
5. OVERVIEW OF PROGRESS 
5.1 The Group first met on 27 March 2023, signing off the Terms of Reference 
and agreeing areas of topics to include within a work plan. Following this
meeting, monthly hybrid meetings were held, and the following areas were
discussed and progressed: 
I. Developer Contributions and Affordable Housing Supplementary
Guidance Updates  
A presentation providing a summary of the proposed updates to the 
Developer Contributions and Affordable Housing Supplementary   
Guidance 2020 was delivered to the Group. Agreement was reached 
on: 
• removing the following bullet point within the Appendix: Part 2 –
Affordable Housing - Where there is an existing high concentration of
affordable housing in the area and the provision of a commuted sum
would help achieve more balanced communities elsewhere in the
housing market area.
• including reference in the report that it had been discussed and
supported by the Member / Officer Working Group.
• submitting the revised report to the Environment, Infrastructure &
Economic Development Committee on 31 May 2023 for approval. This
was subsequently agreed by the Committee. 
II. Modular Housing Feasibility Assessment Overview 
Page 222 of 232

Page 223

An overview presentation, which covered all aspects of Modular and 
Off-site Construction options available, was delivered to the Group.   
Several points were discussed after the presentation regarding: 
• difficulties arising as a result of high construction costs.
• levels of engagement and input with builders on the types of houses to
be built.
• construction methods and exploration of different techniques of house
building. 
III. Financial Viability of Council New Build 
Following on from the presentation regarding modular housing, and
high construction costs, an overview paper outlining how the financial
viability of Council New Build projects is determined was circulated to
Group members. 
IV. Rent Setting Strategy for HRA Gypsy Traveller Sites (Double
Dykes / Bobbin Mill) 
A presentation providing a summary of an options appraisal for revised
rent setting options for the Gypsy/Traveller sites held on the Housing
Revenue Account (HRA) was delivered to the Group. The Group
agreed with the preferred option and proposal and requested, with the
appropriate governance checks, that the option – reduce the rent for
both sites – to be implemented as soon as possible. This was
implemented from the beginning of October 2023. 
V. HRA Rent Setting Strategy – Rent Setting Process and Options
Appraisal 
A presentation providing a detailed overview on the background and
processes regarding the management of the Housing Revenue
Account, including three potential rent level options was provided.
Members were asked to: 
• consider the proposed rent increased options.
• provided feedback on the options and areas of increased 
spend.
• provide feedback on the proposed increase in service charges. 
Based on the feedback from Members, the three rent level options
presented were amended to reflect the feedback. This was to ensure
that the priorities of tenants’ regarding improvements to repairs
response timescales and quality of home were met. 
Consultation and engagement opportunities are now being held with all
tenants on the proposed rent level options and service charge
increases, and tenants will be asked to vote on their preferred option.
Page 223 of 232

Page 224

Details of tenant feedback will be included in a committee paper
presented to Housing & Social Wellbeing in January 2024 for
implementation in April 2024. 
VI. Overview on Housing Needs for those with particular support
requirements 
A presentation was delivered providing an overview of the housing
projects and the streamlined process for people with particular housing
and support needs. Members were provided with an overview of the
progress made to date and the various projects and activities in the
pipeline. 
VII. Perth Prison Employability Project 
A verbal overview on the above project was provided and Members
were given a detailed information on the support and assistance
available to prisoners and following their release. 
5.2 Alongside the above meetings, a visit was also arranged for Members to view
the new custody suite for women, Bella Centre, in Dundee. 
6. CONCLUSION   
6.1 The above information provides an overview and update to Members on the
work progressed by the Affordable Housing Member Officers Working Group.
The Working Group has provided officers with the opportunity to discuss and
debate various key priorities and the challenges faced with the delivery of
affordable housing. Members have provided supportive, challenging and
constructive feedback on the development and delivery of key Housing
services to ensure the best outcomes are achieved for tenants and
communities within Perth & Kinross. 
Page 224 of 232

Page 225

Author
Name  Designation Contact Details
Elaine Ritchie  Senior Service
Manager 
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
21 November 2023 
APPENDICES 
• Appendix 1 – Affordable Housing – Member/Officer Working Group – 
Terms of Reference
• Appendix 2 - Meeting Topics and Work Plan 
Page 225 of 232

Page 226

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  Yes
Risk None
Consultation 
Internal  No
External  No
Communication 
Communications Plan  No 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(i) Reducing Poverty (including child poverty, fuel poverty and food poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:- 
(i) Children and young people grow up safe, respected, well-educated,  
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local 
economy which support low carbon ambitions and offers opportunities  
for all; 
(iii) People can achieve their best physical and mental health and have 
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially    
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of 
climate and environmental change for this and future generations.
Page 226 of 232

Page 227

2. Resource Implications 
Financial 
2.1 There are no financial implications arising from this report. 
Workforce 
2.2 There are no workforce implications arising from this report. 
Asset Management (land, property, IT) 
2.3 There are no asset management implications arising from this report. 
3. Assessments 
Equality Impact Assessment 
3.1 This report has been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i) Assessed as not relevant for the purposes of EqIA
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. No further action is required as it does not qualify as a PPS as
defined by the Act and is therefore exempt. 
Sustainability   
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.4 The information contained within this report has been considered under the
Act. However, no action is required as the act does not apply to the matters
presented in this report. 
Page 227 of 232

Page 228

Legal and Governance 
3.5      Not applicable. 
Risk 
3.6 Not applicable. 
4. Consultation 
Internal 
4.1 Heads of Service and senior managers from Communities have been
consulted on the content of this report. 
External 
4.2 The Tenant Committee Report Panel was consulted on this report. They 
commented that it was good to see Members taking more time to discuss and  
debate issues and factors that impact on housing and tenants. 
5. Communication 
5.1 No communication plan is required. 
2. BACKGROUND PAPERS 
2.1 The minute of the Perth & Kinross Council Committee meeting held on 21
December 2022 were relied upon during the preparation of this report. 
Page 228 of 232

Page 229

Appendix 1 
PERTH & KINROSS COUNCIL                 
AFFORDABLE HOUSING MEMBER/OFFICER WORKING GROUP 
Role and Remit: 
• To provide strategic leadership and direction on the priorities and delivery of
the Strategic Housing Investment Plan and all aspects of the provision of
affordable housing in Perth & Kinross. 
• To monitor the delivery of affordable housing targets (Council, RSL and private
developers) and their effectiveness in meeting the key strategic priorities as
agreed within the Local Housing Strategy. 
• To consider the financial issues arising from the provision of affordable housing
in relation to delivery, value for money and affordability to tenants. 
• To respond to proposals, guidance and consultation papers on Housing and
Planning regarding the provision of affordable housing. 
• To consider best practice in the provision of affordable housing, focusing on
experience in other parts of the UK and in the European community. 
Membership: 
Convener of Housing and Social Wellbeing Committee
3 Elected Members and Provost – SNP, Independent, Labour and Conservative 
Executive Director (Communities)
Senior Service Manager – Housing
Strategy and Policy Manager (Communities)
Team Leader - Housing and Policy (Communities) 
Frequency of Meetings: 
Meetings to be held over a 6-month period, as frequently as required. 
10
Page 229 of 232

Page 230

Page 230 of 232

Page 231

Appendix 2 
Perth & Kinross Council Affordable Housing Members/Officer Working Group
Meeting Topics and Work Plan 
Item Topic Responsible
Officer(s)
Meeting Date
1 Affordable Housing Integration within Housing
Developments Policy Statement to support
Planning Decisions 
Ben Wilson /
Elaine Ritchie
May
2 Modular Housing Feasibility Assessment  Ben Wilson June
3 Financial Viability of Council New Build  Steven Coyle July
4 Rent Setting Strategy for HRA Gypsy Traveller
Sites (Double Dykes / Bobbin Mill) 
Elaine Ritchie August
5 Visit to the New Custody Suite for Women -
Bella Centre – Dundee 
Elaine Ritchie August 
6 HRA Rent Setting Strategy – Rent Setting
Process and Options Appraisal 
Steven Coyle /
Elaine Ritchie
September
7 Overview on Housing Needs for those with
particular support requirements 
Hannah Kettles
/ Elaine Ritchie
October
8 Perth Prison Employability Project  Nicola
Rogerson /
Elaine Ritchie 
October
9 Site Visits:
• Fairfield – New Housing Development
• Visits regarding Mid-Market Rent models
Ben Wilson /
Elaine Ritchie  August 
10 Meeting topics and areas of work concluded    All October 
10
Page 231 of 232

Page 232