Democracy Spraffa

Agenda Document Pack - Housing and Social Wellbeing Committee - 25/01/2023

Perth and Kinross Council · 25 January 2023
Back to Housing and Social Wellbeing Committee — 25 January 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
18/01/2023 
A hybrid meeting of the Housing and Social Wellbeing Committee will be held in
the Council Chamber on Wednesday, 25 January 2023 at 14:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Tom McEwan  (Convener)
Councillor Sheila McCole  (Vice-Convener)
Councillor Jack Welch  (Vice-Convener)
Bailie Chris Ahern
Councillor Peter Barrett
Councillor Bob Brawn
Bailie Rhona Brock
Councillor Stewart Donaldson
Councillor Michelle Frampton
Councillor Ian James
Councillor Noah Khogali
Councillor Brian Leishman
Councillor Iain MacPherson
Bailie Claire McLaren
Councillor Frank Smith
Page 1 of 250

Page 2

Page 2 of 250

Page 3

Housing and Social Wellbeing Committee 
Wednesday, 25 January 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE HOUSING AND SOCIAL
WELLBEING COMMITTEE OF 2 NOVEMBER 2022 FOR
APPROVAL
(copy herewith) 
5 - 6 
4 POLICE AND FIRE REFORM: LOCAL SCRUTINY AND
ENGAGEMENT   
4(i)  FIRE AND RESCUE SERVICE QUARTERLY PERFORMANCE
REPORT - 1 JULY 2022 TO 30 SEPTEMBER 2022
Report by Area Manager, Local Senior Officer, Scottish Fire and
Rescue Services (copy herewith 23/6) 
7 - 32 
4(ii)  PERTH AND KINROSS LOCAL POLICING AREA QUARTERLY
POLICE REPORT - 1 JULY 2022 TO 30 SEPTEMBER 2022
Report by Chief Superintendent, Police Scotland (copy herewith
23/7) 
33 - 78 
5 COMMUNITY PLANNING PARTNERSHIP UPDATE
Report by Head of Cultural and Community Services (copy herewith
23/8) 
79 - 92 
6 HOUSING REVENUE ACCOUNTS (HRA) STRATEGIC
FINANCIAL PLAN INCORPORATING THE 5 YEAR CAPITAL
INVESTMENT PROGRAMME AND RENT STRATEGY TO
2027/28; RESERVES STRATEGY AND OTHER HOUSING
CHARGES FOR 2023/24
Report by Executive Director (Communities) and Head of Finance
(copy herewith 23/9) 
93 - 136
Page 3 of 250

Page 4

7  UPDATE ON PARTICIPATION IN THE GYPSY/TRAVELLER
NEGOTIATED STOPPING PROJECT AND APPROVAL FOR A
TRANSIENT SITE FOR VISITING GYPSY TRAVELLERS
Report by Head of Environmental and Consumer Services (copy
herewith 23/10) 
137 - 156 
8 JUSTICE UPDATE REPORT 2021/22
Report by Executive Director (Education and Children's Services)
(copy herewith 23/11) 
157 - 224 
9 TAYSIDE MAPPA ANNUAL REPORT 2021/22
Report by Executive Director (Education and Children's Services)
(copy herewith 23/12) 
225 - 250 
Page 4 of 250

Page 5

HOUSING AND SOCIAL WELLBEING COMMITTEE 
Minute of hybrid meeting of the Housing and Social Wellbeing Committee held in the
Chambers on 2 November 2022 at 10.00am. 
Present: Councillors Bailie C Ahern, P Barrett, B Brawn, R Brock, S Donaldson,  
A Chan, I James, G Laing (substituting for Councillor M Frampton), B Leishman,
I MacPherson, S McCole, T McEwan, and J Welch. 
In Attendance: B Renton, Executive Director (Communities); C Mailer, E Ritchie,  
J McColl, B Wilson, A Saum, N Lennon, S Coyle, D Stokoe and L Haxton (all
Communities); K Molley, A Brown, M Pasternak (all Corporate and Democratic
Services). 
Apologies: Bailie C McLaren and Councillor M Frampton 
Councillor T McEwan, Convener, Presiding. 
The Convener led the discussion on Items 1-4 and 6 with Vice-Convener J Welch on
Item 5. 
1. WELCOME AND APOLOGIES 
Councillor T McEwan welcomed everyone to the meeting. 
A five-minute video was shown to Committee regarding the development and
success of the Home First Approach in local communities. Members commended the
Housing Team for their work in helping the homelessness service across Perth and
Kinross. 
Apologies for absence and substitutions were noted as above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF PREVIOUS MEETING 
The minute of the meeting of the Housing and Communities Committee of 7
September 2022 was submitted and approved as a correct record. 
4. OUTSTANDING BUSINESS STATEMENTS (OBS) 
Resolved: 
The Outstanding Business Statement be noted and updated accordingly.  
3
Page 5 of 250

Page 6

VICE-CONVENER WELCH TOOK THE CHAIR FOR THE FOLLOWING ITEM 
5. COMMUNITY PLANNING PARTNERSHIP UPDATE 
There was submitted a report by Head of Cultural and Community Services
(22/261) providing update on the work of the Community Planning Partnership (CPP)
since the previous report on 7 September 2022. 
Resolved:
The contents of Report 22/261, be noted. 
CONVENER RE-TOOK THE CHAIR AT THIS POINT 
6. STRATEGIC HOUSING INVESTMENT PLAN 2023/24 – 2027/28 
There was submitted a report by Executive Director (Communities) (22/262)
seeking approval of the Strategic Housing Investment Plan (SHIP) 2023/24 –
2027/28. 
A Saum delivered a five-minute slide-based presentation providing an
overview of the Strategic Housing Investment Plan (SHIP). Members questions were
answered, and the Convener thanked A Saum for his informative presentation. 
Resolved:
(i) The contents of the Strategic Housing Investment Plan 2023/24 – 2027/28, be
approved.
(ii) The ongoing development of the SHIP, be approved and the Strategic
Affordable Housing Board be given authority to ensure that where projects fall
out of the plan, alternative projects, prioritised in the same way are substituted
for them.
(iii) The submission of the SHIP to the Scottish Government, be approved. 
~~~~~~
Page 6 of 250

Page 7

NOT PROTECTIVELY MARKED 
PERTH AND KINROSS COUNCIL 
HOUSING AND SOCIAL WELLBEING COMMITTEE 
25 January 2022 
Report by Area Manager Jason Sharp, Local Senior Officer, Scottish Fire and
Rescue Service
(Report No. 23/6)   
SUBJECT: FIRE AND RESCUE QUARTERLY PERFORMANCE REPORT 
1 JULY TO 30 SEPTEMBER 2022 
Abstract
The Reports contain performance information relating to the second quarter (1 July
– 30 September) of 2022-23 on the performance of the Scottish Fire and Rescue
Service in support of Member scrutiny of local service delivery.
1 PURPOSE OF THE REPORT 
To provide information for the Committee regarding the performance of the
Scottish Fire and Rescue Service, against the priorities, performance
indicators and targets detailed within the Local Fire and Rescue Plan for
Perth and Kinross 2020-23, to facilitate local scrutiny.
2 RECOMMENDATIONS 
It is recommended that members: 
Note, scrutinise, and question the content of this report.
3 FINANCIAL IMPLICATIONS 
None.
4 PERFORMANCE 
4.1 A performance management framework has been developed to facilitate the
monitoring of performance against the agreed priorities and outcomes
ensuring effective targeting of resources and the principles of Best Value are
met. 
4(i)
Page 7 of 250

Page 8

NOT PROTECTIVELY MARKED 
4.2 The Local Fire and Rescue Plan for Perth & Kinross 2020-23 was approved
by the Housing and Communities Committee on the 2nd of December 2020. 
4.3 The priorities and outcomes contained within the Local Fire and Rescue Plan
reflect ‘place’ and the contribution of Scottish Fire and Rescue Service to the
Perth and Kinross Community Plan (LOIP) 2017-27 and Community Planning
Partnership. 
4.4 In summary the following local priorities and targets are detailed within the
plan: 
Priority 1 - Improving Fire Safety in the Home
Priority 2 - Improving Fire Safety and Resilience in the Business Community
Priority 3 - Minimising the Impact of Unintentional Harm  
Priority 4 - Reducing Unwanted Fire Alarm Signals 
Priority 5 - Reducing Deliberate Fires
Priority 6 - Effective Risk Management and Operational Preparedness 
4.5 Appendix 1 attached to this report provides a detailed breakdown and
analysis of all data collected during the reporting period. A performance
summary and scorecard is detailed on page 6 of the report. In addition,
further sections are included to provide Members with an overview of a range
of notable incidents and events undertaken by the local personnel/stations in
support of prevention activities and preparation for emergency response. 
5 EQUALITY IMPACT ASSESSMENT 
5.1  Not applicable. 
6 ENVIRONMENTAL ISSUES 
6.1  There are no environmental issues arising as a consequence of this report.
7 SUMMARY 
7.1  The attached report updates members regarding significant community
safety engagement activities and operational matters; and gives context to
the performance of the Scottish Fire and Rescue Service in the Perth and
Kinross area. 
Area Manager Jason Sharp
Local Senior Officer
Perth & Kinross, Angus and Dundee
Fire and Rescue Headquarters
Blackness Road,
Dundee DD1 5PA
Page 8 of 250

Page 9

QUARTERLY MONITORING REPORT
Covering the activities and performance in
support of the Local Fire and Rescue Plan for
Perth & Kinross.
Quarter Two: 2022/23
4(i)
Page 9 of 250

Page 10

2
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
ABOUT THE STATISTICS IN THIS REPORT 
The activity totals and other statistics quoted in this report are provisional in nature and subject
to change as a result of ongoing quality assurance and review. 
Because all statistics quoted are provisional there may be differences in the period totals quoted
in our reports after original publication which result from revisions or additions to the data on our
systems. 
From 2015-16 onwards responsibility for the publication of end-year statistical data transferred
from the Scottish Government to the SFRS. This change of responsibility does not affect the
status of the figures quoted in this and other SFRS reports presented to the Committee. 
Page 10 of 250

Page 11

3
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance 
TABLE OF CONTENTS PAGE  
Introduction  5
Quarterly Performance Summary 6
Quarterly Performance Highlights 7
Priority 1 - Improving Fire Safety in The Home 8
HI 1 – Accidental Dwelling Fires (ADF) 8
HI 2 – ADF Fatal Casualties 8
HI 3 – ADF Non-Fatal Casualties 8 
Priority 2 - Improving Fire Safety and Resilience in the Business Community 10
HI 4 - Non-Domestic Building Fires             10
HI 5 – Fatal Casualties in Non-Domestic Buildings  10
HI 6 – Non-Fatal Casualties in Non-Domestic Buildings  10
Priority 3 - Minimising the Impact of Unintentional Harm 12
HI 7 – Road Traffic Collision (RTC) Incidents 12
HI 8 – Fatal RTC Casualties 12
HI 9 – Non-Fatal RTC Casualties 12
Priority 4 - Reducing Unwanted Fire Alarm Signals 14
HI 10 – Unwanted Fire Alarm Signals (UFAS) 14
Priority 5 - Reducing Deliberate Fires 16
HI 11 – Deliberate Primary Fires 16
HI 12 – Deliberate Secondary Fires 16
Priority 6 - Effective Risk Management and Operational Preparedness 18
Activity Update 
APPENDIX 1: COMMUNITY SAFETY ENGAGEMENT PROGRAMMES  19
APPENDIX 2: NOTABLE INCIDENTS / EVENTS 21
Page 11 of 250

Page 12

4
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
This page is intentionally blank 
Page 12 of 250

Page 13

5
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance 
INTRODUCTION 
This quarter two monitoring report covers the SFRS’s performance and activities in
support of the six priorities in the Local Fire and Rescue Plan for Perth & Kinross,
namely:
• Priority 1 - Improving fire safety in the home
• Priority 2 - Improving fire safety and resilience in the business community
• Priority 3 - Minimising the impact of unintentional harm
• Priority 4 - Reducing unwanted fire alarm signals
• Priority 5 - Reducing deliberate fires
• Priority 6 - Effective risk management and operational preparedness 
As well as supporting the six priorities in the Local Fire and Rescue Plan for Perth &
Kinross, this monitoring report shows how SFRS activities and performance contribute
to the wider priorities of the Perth & Kinross Council Community Planning Partnership
(CPP), as set out in the Perth & Kinross Community Plan (LOIP).
The figures in this report are provisional, to provide the Committee with the SFRS’s
direction of travel in the Perth & Kinross area, in terms of performance against headline
indicators and targets. Most figures will not change; however, members should note that
there may be some small variations for some indicators when the final confirmed figures
are published by the SFRS.
The Perth & Kinross Council Housing and Communities Committee agreed the new
Local Fire and Rescue Plan for Perth & Kinross on 2 December 2020, covering a three-
year period. In support of delivering the priorities in this plan, 12 headline indicators
and targets have been set, and form the basis of this quarterly monitoring report. 
Page 13 of 250

Page 14

6
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
PERFORMANCE SUMMARY
The table below provides a summary of quarter two activity and year to date (YTD)
performance against Headline Indicators and annual targets. It aims to provide, at a
glance, our direction of travel during the current reporting year.
HI 1
Accident Dwelling Fires (ADF) 
HI 2
ADF Fatal Casualties 
HI 3
ADF Non-Fatal Casualties 
Q2 – 20 Incidents 
YTD – 38 Incidents
Annual Target – 104 Incidents  
Q2 – 0
YTD – 0
Annual Target – 0
Q2 – 0 
YTD – 0
Annual Target – 18
HI 4
Non-domestic Building fires 
HI 5
Fatal Casualties in Non-Domestic
Building Fires 
HI 6
Non-Fatal Casualties in Non-
Domestic Building Fires 
Q2 – 8 Incidents
YTD – 19 Incidents
Annual Target – 53 Incidents  
Q2 – 0
YTD – 0
Annual Target – 0  
Q2 – 0
YTD – 0
Annual Target – 2
HI 7
Road Traffic Collision (RTC)
Incidents 
HI 8
Fatal RTC Casualties 
HI 9
Non-Fatal RTC Casualties 
Q2 – 26 Incidents
YTD – 43 Incidents
Annual Target – 83 Incidents  
Q2 – 2
YTD – 2
Annual Target – 0                         
Q2 – 13                       
YTD – 20
Annual Target – 70
HI 10
Unwanted Fire Alarm Signals 
HI 11
Deliberate Primary Fires 
HI 12
Deliberate Secondary Fires 
Q2 – 171 Incidents
YTD – 288 Incidents
Annual Target – 620 Incidents   
Q2 – 5 Incidents   
YTD – 9 Incidents
Annual Target – 29 Incidents  
Q2 – 31 Incidents
YTD – 49 Incidents
Annual Target – 80 Incidents 
Year-to-Date Legend  
Below headline target 
Less than 10% above headline target 
More than 10% above headline target  
Page 14 of 250

Page 15

7
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance 
PERFORMANCE HIGHLIGHTS 
During Quarter Two (July-September) the SFRS attended a total of 597 incidents across
Perth & Kinross. 
Of the 12 headline indicators and targets, the following performance should be noted for
Quarter Two 22/23:
• The number of Accidental Dwelling Fires (ADF’s) continues to decrease in the long term,
reporting the lowest YTD number of ADFs in the last three years (20 incidents against an
average of 23). The performance during quarter two reflects a similar decrease on same
quarter last year (21) and on the three-year average. 
• There were no ADF Fatal Casualties 
• The number of ADF Non-Fatal Casualties (0) is below to the three year average (3). 
• The number of Non-Domestic Building fires (8) is reflecting a decrease for this quarter, last
quarter and is less than the three-year average (14). There were no fatal casualties and no non-
fatal casualties reported for quarter two in non-domestic building fires. 
• The number of Road Traffic Collisions for quarter two is reflecting an increase against the three
year average for this quarter (26 against 14). There is an increase on the same quarter last year
and the YTD numbers. There were two Fatal RTC Casualties reported for this quarter whilst Non-
Fatal RTC Causalities is reporting 13. The number of RTC casualties is the highest for the last
three years for this quarter and YTD. 
• The number of Unwanted Fire Alarm Signals (UFAS) caused by automatic fire alarms (AFAs) in
non-domestic buildings reports a decrease, 171 against a three-year average of 197. YTD figures
for 22/23 is above our annual target (for Q2) 171 against 155.   
• The number of Deliberate Primary Fires is reflecting a decrease against the average, five
incidents against an average of eight. The number of Deliberate Secondary Fires is reporting
an increase for this quarter 31 against an average of 19 and also increase YTD 49 against 63
incidents last year. 
Accidental Fires
16%
Deliberate Fires
6%
Special Service
17%
False Alarms
61%
Perth & Kinross Quarter Two Incident Breakdown
Accidental Fires Deliberate Fires Special Service False Alarms
Page 15 of 250

Page 16

8
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
PRIORITY 1 - IMPROVING FIRE SAFETY IN THE HOME
HI 1 – Accidental Dwelling Fires (ADF) 
Table 1: Year to Date (June - September) Performance 
HI 2 - ADF Fatal Casualties & HI 3 - ADF Non-Fatal Casualties 
Table 2: Year to Date (April - June) Performance 
29
18
21 20
0
5
10
15
20
25
30
35
19/20 20/21 21/22 22/23
HI 1 - Quarter Two
Incidents 3yr Average
6
2
1
0
0
1
2
3
4
5
6
7
19/20 20/21 21/22 22/23
HI 2 & HI 3 - Quarter Two
ADF Fatal Fire Casualties ADF Non-Fatal Fire Casualties 3yr Average
19/20 20/21 21/22 22/23 Annual
Target
H1: ADF’s 29 18 21 20 104 
19/20 20/21 21/22 22/23 Annual
Target
H2: ADF Fatal Casualties 0 0 0 0 0
H3: ADF Non-Fatal Casualties 6 2 1 0 18
Page 16 of 250

Page 17

9
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
Indicator Description
The largest single type of primary fire in Perth & Kinross is ADF in the home and their
prevention is a key focus of the Service’s community safety activity. 
HI 1 – Accidental Dwelling Fires
As a headline target, the aim is to reduce the rate of ADF’s, in a growing Perth & Kinross
population, by keeping these fires below 104, each year. 
HI 2 – ADF Fatal Casualties
This indicator counts those people for whom fire has been clearly identified as the cause
of death, even if they die some-time after the actual fire. Those who die at, or after, the
fire but where fire is not identified as the cause of death are not included in these
figures. As a headline target, the aim is to have Zero ADF Fatal Casualties, in Perth
& Kinross each year. 
HI 3 – ADF Non-Fatal Casualties
This headline target counts all types of non-fatal fire injury in the home, including
precautionary checks. As a headline target, the aim is to reduce the risk of injury from fire
in the home, in an increasing Perth & Kinross population, by keeping fire injuries below 18,
each year. 
What we aim to Achieve
As well as helping to deliver Priority One: Improving Fire Safety in the Home, meeting the
headline targets will also support a long-term vision in the Perth & Kinross LOIP. 
We also link this headline target to improving the following Perth & Kinross LOIP objectives:
• Developing educated, responsible and informed citizens
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations 
Performance Management
There were 20 ADF’s reported during quarter two, which reflects a decreased number of fires
for the same quarter last year which was 21 and is lower than the three-year average (23).
The fire damage in 13 incidents was reported as low level and 2 medium. No properties
sustained significant damage. Of the 20 fires, 9 had previously been fitted with smoke
detection, of which 8 operated and gave early warning to the occupiers. The total number of
ADF’s continues to decrease in the long term, currently we are reporting the second lowest
number of fires for the last five years. This is as a result of a number community safety
initiatives delivered through partnership working. We are therefore showing Green for
achieving the HI 1 annual target. 
There was no ADF Fatal Casualties during quarter two. We are therefore showing Green for
achieving the HI 2 annual target. There were no ADF Non-Fatal Casualties during quarter two.
This is the lowest number of quarterly non-fatal casualties for the last five years. We are
showing Green against the HI 3 annual target. 
Within Perth & Kinross we will continue to work with our partners to ensure we positively
contribute to reducing the risk to our communities and staff by analysis of our operational
activities and targeting those most at risk and vulnerable, particularly around unintentional
harm in the home. These targeted initiatives will continue to develop and improve as we move
forward together to ensure we provide the most appropriate support for our communities with
regard to unintentional harm. 
Page 17 of 250

Page 18

10
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
PRIORITY 2 – IMPROVING FIRE SAFETY AND RESILIENCE IN THE     
BUSINESS COMMUNITY
HI 4 - Non-Domestic Building Fires 
Table 3: Year to Date (July - September) Performance 
HI 5 – Fatal Fire Casualties in Non-Domestic Buildings & HI 6 – Non-Fatal Fire
Casualties in Non-Domestic Buildings 
Table 4: Year to Date (July - September) Performance 
1
0 0 00 0
1
0
0
1
2
3
4
19/20 20/21 21/22 22/23
HI 5 & HI 6 - Quarter Two
All Fatal Fire Casualties All Non-Fatal Fire Casualties
19/20 20/21 21/22 22/23 Annual
Target
H4:  Non-domestic Building             
Fires 14 16 14 8 53 
19/20 20/21 21/22 22/23 Annual
Target
H5: Fatal Fire Casualties 1 0 0 0 0
H6: Non-Fatal Fire Casualties 0 0 1 0 2
Page 18 of 250

Page 19

11
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance 
What we aim to Achieve
As well as helping to deliver Priority Two: Improving Fire Safety and Resilience in the
Business Community, we also link this headline target to improving the following Perth &
Kinross LOIP outcomes:
• Promoting a prosperous, inclusive and sustainable economy
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations 
Performance Management
There were 8 fires in non-domestic buildings during quarter two which reflects a decrease
from the same quarter last year with 14 and on the previous quarter this year (15). The quarter
two figure (8) is also below to the three-year average. Six incidents resulted in minor damage
and the remaining three suffered medium heat and smoke damage. This therefore is showing
Green against the HI 4 annual target to date. 
There were no Non-Domestic Fatal Fire Casualties and no Non-Domestic Casualties during
quarter two. YTD, we are showing Green against the HI 6 annual target. 
The COVID pandemic restrictions had impacted our ability to fully undertake fire safety audits
within commercial buildings however we are now conducting audit as per Pre-COVID.
Following the easing of restrictions and in support of our Fire Safety Enforcement Plan we
undertook 60 audits during the Q2 period. A great deal of fire safety enforcement activity
involves the engagement with local businesses to ensure they maintain safety procedures to
ensure the safety of their staff and members of the public. There were no enforcement/formal
notices issued within any business in Perth and Kinross during this Q2 reporting period. 
Fire Safety Enforcement Officers (FSEO’s) will continue to provide the most appropriate level
of support to local businesses to enable suitable and timely legislative fire safety guidance
and enforcement to be undertaken. We also continue to engage and support local and
national business forums to ensure the right level of consistent information is provided to the
business community.
Indicator Description
These headline indicators and targets cover the types of non-domestic buildings
applicable to Part 3 of the Fire (Scotland) Act 2005 (‘The Act’) (e.g. care homes, hotels and
hospitals etc.) and is designed to reflect the effectiveness of fire safety management in
respect of these types of buildings. 
HI 4 - Non-Domestic Building Fires Applicable to the Act
As a headline target, the aim is to reduce the rate of fires in non-domestic buildings
(where The Act applies), by keeping these fires below 53, in Perth & Kinross each year. 
HI 5 – Fatal Fire Casualties in Non-Domestic Building Fires Applicable to the Act
This indicator counts those people for whom fire has been clearly identified as the cause
of death, even if they die sometime after the actual fire. Those who die at, or after, the
fire but where fire is not identified as the cause of death are not included in these
figures. As a headline target, the aim is to have Zero Fatal Fire Casualties in non-
domestic buildings applicable to the Act, in Perth & Kinross each year. 
HI 6 – Non-fatal Fire Casualties in Non-Domestic Building Fires Applicable to the Act
This headline target counts all types of non-fatal fire injury in non-domestic buildings,
including precautionary checks. As a headline target, the aim is to reduce risk of injury
from fire in non-domestic buildings, by keeping fire injuries below 2, in Perth & Kinross each
year. 
Page 19 of 250

Page 20

12
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
PRIORITY 3 – MINIMISING THE IMPACT OF UNINTENTIONAL HARM 
HI 7 – Road Traffic Collision (RTC) Incidents 
Table 5: Year to Date (July - September) Performance 
HI 8 – Fatal RTC Casualties & H9 – Non-Fatal RTC Casualties 
Table 6: Year to Date (July - September) Performance 
21
17 18
26
0
5
10
15
20
25
30
19/20 20/21 21/22 22/23
HI 7 - Quarter Two
RTC 3yr Average
0 0
2 2
12
5
10
13
0
2
4
6
8
10
12
14
19/20 20/21 21/22 22/23
HI 8 & HI 9 - Quarter Two
Fatalities Casualties 3yr Average
19/20 20/21 21/22 22/23 Annual
Target
H7:  RTC Incidents     21 17 18 26 83 
19/20 20/21 21/22 22/23 Annual
Target
H8: Fatal RTC Casualties 0 0 2 2 0
H9: Non-Fatal RTC Casualties 12 5 10 13 70
Page 20 of 250

Page 21

13
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
Indicator Description
The SFRS has become increasingly involved in more non-fire related prevention work, in support
of its role in promoting the wider safety and well-being of its communities, including minimising
the impact of unintentional harm. The headline indicators and targets reflect the fact that most of
the non-fire related incidents attended by the SFRS in Perth & Kinross are RTC Incidents. 
HI 7 - RTC Incidents
As a headline target, the aim is to reduce the rate of RTC incidents, by keeping them
below 83 each year. 
HI 8 – Fatal RTC Casualties
As a headline target, the aim is to reduce the risk of death from RTC’s in Perth & Kinross,
by keeping them below 0 each year. 
HI 9 - Non-fatal RTC Casualties
As a headline target, the aim is to reduce the risk of injury from RTC’s in Perth & Kinross,
by keeping non-fire injuries below 70 each year. 
What we aim to Achieve
As well as helping to deliver Priority Three: Minimising the Impact of Unintentional Harm, we
also link these headline targets to improving the following Perth & Kinross LOIP outcomes:
• Developing educated, responsible and informed citizens
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations 
Performance Management 
We attended 26 RTC Incidents to assist with the safety of the incident scene and
release/extricate occupants were necessary trapped in the vehicles as a result of a collision.
Quarter two is reporting a slightly higher than average figure (26 against 19). We do however
need to take cognisance that the three-year average figures included COVID lockdown periods
where traffic levels were reduced. Comparing our Q2 totals against this average may not
necessarily be a true reflection of the situation. Of the 26 incidents attended five required more
technical extrication to release casualties. We are showing Green for achieving the HI 7 annual
target.
From all the RTC Incidents we attended during quarter two there were 2 recorded fatalities,
therefore we are showing Red for achieving the HI 8 annual target.
Of the 26 RTC Incidents we attended during quarter two, there were 13 non-fatal casualties.
YTD, we are reporting seven non-fatal casualties which is higher than the three-year average
of 9. In comparison to our annual target HI 9, we are currently showing Green. 
This type of incident accounts for around 3% of all incidents and 15% of all special service
incidents attended this quarter. However, these types of incidents account for a high number
of casualties every year which requires a multi-agency partnership approach to reduce these
risks to people on our roads. Road Safety within Perth & Kinross has established a Road
Safety Partnership to ensure we constantly review our current position. This multi-agency
group is working locally to establish reduction priorities which will influence the content of Perth
and Kinross Road Safety plan and subsequent actions. The Road Safety Plan is now in place
which is supported by an annual action plan. These actions will ensure we work, as a
partnership. To compliment this Highlight Indicator, Perth Fire Station hosted the first
Motorcycle Rider Refinement course which was led by Police Scotland and supported by the
Institute of Advanced Motoring. In addition to this we are working in partnership with Police
Scotland to develop the new Driver Scheme which will replace the Safe Drive Stay Alive
initiative that was delivered to secondary school in the past. 
Page 21 of 250

Page 22

14
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
PRIORITY 4 - REDUCING UNWANTED FIRE ALARM SIGNALS 
HI 10 – Unwanted Fire Alarm Signals 
Table 7: Year to Date (July - September) Performance 
All False Alarms for Year to Date 
195
173
224
171
0
50
100
150
200
250
19/20 20/21 21/22 22/23
HI 10 - Quarter Two
UFAS Incidents 3yr Average
Equipment Faliure
85%
Good Intent
13%
Malicious
2%
YTD All False Alarms (591) - UFAS = 46%
Equipment Faliure Good Intent Malicious
19/20 20/21 21/22 22/23 Annual
Target
HI 10: UFAS Incidents 195 173 224 171 620
Page 22 of 250

Page 23

15
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
Indicator Description
Automatic Fire alarms (AFA) are fundamental to providing early warning from fire, giving
people the chance to evacuate safely. However, to be effective, they must be properly
installed and maintained, and a good fire safety management regime must be in place
by the duty holder, so they do not activate when there is no fire. 
Every Unwanted Fire Alarm Signal (UFAS) from an AFA has an impact in terms of
unnecessary blue light journeys, redirecting SFRS resources away from other activities
such as community safety engagement and causing considerable disruption to
businesses. 
HI 10 – Unwanted Fire Alarm Signals (UFAS)
As a headline target, the aim is to improve fire safety management and awareness, by
reducing the number of attendances to unwanted fire alarm signals (UFAS) from
automatic systems in non-domestic buildings to less than 620 each year. 
What we aim to Achieve
As well as helping to deliver Priority Four: Reducing Unwanted Fire Alarm Signals, we also
link this headline target to improving the following Perth & Kinross LOIP outcome:
• Promoting a prosperous, inclusive and sustainable economy 
Performance Management 
During quarter two 2022/23, SFRS mobilised to 171 UFAS incidents from a total of 365 False
Alarms.  This is a decrease (8%) in comparison to the same quarter in 2021/22 when there
were 224 UFAS incidents. UFAS this quarter accounted for 28% of our total operational
demand. Against our HI 10 annual target we are currently showing Green. 
The table below lists the 5 property types that had persistent call-outs due to UFAS during
quarter two. When analysed further, it is the same property types that are causing UFAS in
Perth & Kinross and nationally, the picture is very similar. 
Property Types - UFAS
22-23
Q1  
Education – Secondary and Primary 41
Home, Nursing/Care, sheltered Offices 21
Hospital/ Medical Care Offices and Call Centres 14
Offices and Call Centres 8
Retail 6 
During quarter two our operational crews continued to investigate the cause of every UFAS
event to ensure the appropriate level of engagement with the duty holder when in attendance
at these call-outs. Every UFAS incident SFRS attends is used as an opportunity to educate
the duty holder about the impact UFAS has on their businesses, the community and the Fire
and Recue Service. 
Following a full review of false alarms within Scotland by the SFRS and a transparent
consultation process. The outcome of this review will reduce the amount of false alarms we
mobilise to. We anticipate to start rolling this out new approach within Q3 and Q4.  
Page 23 of 250

Page 24

16
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
PRIORITY 5 – REDUCING DELIBERATE FIRES 
HI 11 – Deliberate Primary Fires 
Table 8: Year to Date (July - September) Performance 
HI 12 – Deliberate Secondary Fires 
Table 9: Year to Date (July - September) Performance 
10
9
8
5
0
2
4
6
8
10
12
19/20 20/21 21/22 22/23
HI 11 - Quarter Two
All Deliberate Primary Fires 3yr Average
23
18
16
31
15
17
19
21
23
25
27
29
31
19/20 20/21 21/20 22/23
HI 12 - Quarter Two
All Deliberate Secondary Fires 3yr Average
19/20 20/21 21/22 22/23 Annual
Target
HI 11: Deliberate Primary Fires 10 9 8 4 29 
19/20 20/21 21/22 22/23 Annual
Target
HI 12: Deliberate Secondary Fires 23 18 16 31 74
Page 24 of 250

Page 25

17
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
Indicator Description
These headline and indicators targets account for all types of fire that are believed to have
been started intentionally, and are categorised as Deliberate Primary Fires and Deliberate
Secondary Fires.
HI 11 – Deliberate Primary Fires
These deliberate fires cover the following types: 
• Fires in the home 
• Fires in non-domestic buildings
• Fires in motor vehicles 
As a headline target, the aim is to reduce the rate of deliberate primary fires in Perth &
Kinross by keeping these fires below 29 each year. 
HI 12 – Deliberate Secondary Fires
These deliberate fires cover the majority of outdoor fires including grassland and refuse fires
and include fires in derelict buildings, but not chimney fires. As a headline target, the aim is
to reduce the rate of deliberate secondary fires in Perth & Kinross by keeping these fires
below 80 each year, this exceeds the annual target. 
What we aim to Achieve
As well as helping to deliver Priority Five: Reducing Deliberate Fires, we also link this headline
target to improving the following Perth & Kinross LOIP outcomes:
• Developing educated, responsible and informed citizens
• Promoting a prosperous, inclusive and sustainable economy
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations 
Performance Management 
There were five deliberate primary fires reported during quarter two, which is below average
(9) and also lower than last year (8). Three of the incidents were grass/woodland fires and the
others involved vehicles, these numbers are below the average and therefore showing Green
against HI 11 annual target. 
There were 31 deliberate secondary fires reported during quarter two which is above the same
quarter in last year (16). There was also an increase against the three year average (31
against 19). The majority of these incidents were in Perth City area, the remaining incidents
were spread across other ward areas. Given the target we have set for this reporting year we
are showing Red against the HI 12 annual target against year to date. 
During the last few months we have continued to work with partners to reduce the number of
all deliberate fire incidents within Perth and Kinross. This proactive approach particularly
around youth engagement endeavours to reduce the number of deliberate fires, particularly
secondary fires, as part of a wider youth awareness education initiative. These included
working with local schools to reduce this unacceptable, anti-social behaviour. This along with
national campaigns during the Summer Season, however we have seen an increase in the
risk locally. There is a continual programme of input each quarter with regard deliberate fire
raising, alongside other educational safety programmes, across Perth and Kinross particularly
around the Perth City area. 
Page 25 of 250

Page 26

18
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
PRIORITY 6 – EFFECTIVE RISK MANAGEMENT AND OPERATIONAL          
PREPAREDNESS
Description
Risk Management and operational preparedness is a key area of work for the SFRS. In Perth
& Kinross, this means:
• Knowing what the risks are in Perth & Kinross and then making plans, so we are resilient
to respond to any event.
• Being prepared to respond to national threats or major emergencies.
• Developing flexibility to deploy crews, to take on a broadening role within the community.
• Firefighters being equipped to deal with emergencies safely and effectively and our
stations being in a constant state of readiness.
• Safe, secure, vibrant and sustainable communities
• An inclusive and sustainable economy
• An enhanced, protected and enjoyed natural and built environment
• Improved physical, mental and emotional health and well-being
What we aim to Achieve
As well as helping to deliver Priority Six: Effective Risk Management and Operational
Preparedness, our activities also support improving the following Perth & Kinross LOIP
objectives:
• Developing educated, responsible and informed citizens
• Promoting a prosperous, inclusive and sustainable economy
• Supporting people to lead independent, healthy and active lives
• Creating a safe and sustainable place for future generations
Activity 
During Quarter Two 2022 (July - September), we have delivered our quarterly training
commitment to operational firefighters, whereby we trained and confirmed their preparedness
to deal with: 
• Extrication Techniques (RTC)
• Breathing Apparatus
• Casualty Care
• Pumps
• Road Traffic Collisions
• Ladders
• Knots and Lines
• Water Awareness 
Firefighters continue to conduct Operational Intelligence visits to sites within their station area
so that they are familiar with the associated risks and hazards and, if required, can take
effective actions in dealing with incidents at these sites. They also continue to conduct Home
Fire Safety Visits, with an action plan implemented to ensure that all High-Risk properties
were visited and telephone contact made with all Medium and Low Risk properties. 
We are maintaining our staff re-integration programme for day staff to be fully proficient to
provide operational resilience should we suffer staff shortages due to Covid-19. With the
relaxation of COVID-19 restrictions the service has recommenced delivering courses that had
been postponed. 
Specific Incident Command, Breathing Apparatus & Compartment Fire Behaviour
Training courses continue, ensuring stations are staffed appropriately to meet the needs of
our communities. Our Trainee Firefighter yearly assessments are also continuing to ensure
that they are developing their skills in line with their 3-year Modern Apprenticeship. We are
also continuing our advertising campaign with a view of filling a number of vacant posts within
our On Call (previously known as retained and volunteer) stations. 
Page 26 of 250

Page 27

19
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
APPENDIX 1: COMMUNITY SAFETY ENGAGEMENT PROGRAMMES 
This section provides details of Community Safety Engagement initiatives undertaken within
Perth & Kinross during the second quarter of 2022/23. The Safer Communities Partnership work
together to continually provide various community safety messages, education, training and
support. This implements risk reduction strategies to support our communities, particularly those
most vulnerable. Working collaboratively also supports the priorities in the Local Fire and
Rescue Plan and the wider Perth & Kinross Council Community Planning Partnerships priorities.
Some examples from quarter two: 
Following the higher than average
water related injuries and deaths
within Scotland last year, locally
the SFRS awareness. The P&K
Community Action Team promoted
Water Safety including Drowning
Prevention Day during the holiday
period through our social media
platforms and leaflet drops. 
During the summer months we
supported the P&K Visitor
Management Campaign. Key
representation from our teams in
Kinloch Rannoch and Blairgowrie
supported local patrols and
engaged directly with visitors and
campers within our beauty spots
and local loch sides. Following the
successful season last year, we
are delighted to be part of this
partner approach to maintain
safety and environmental
concerns.
Perth Fire Station is the venue for
the local Rider Refinement
Motorcycle Training. The course
which runs from May – October
involves seven courses which is led
by Police Scotland and supported
by local road safety partners. We
are delighted to host and take part
this key road safety initiative which
has proved so successful in the
past.
Page 27 of 250

Page 28

20
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance 
The SFRS P&K Community Action
Team and members of Perth Fire
Station Green Watch attended
Perthshire Pride. They had a
fantastic day where they provided
Home Safety and career advice
whilst also promoting respect and
inclusivity.
With the Financial Crisis and Fuel
Crisis, we are trying to highlight
areas of concern prior to Autumn
and Winter. Advice on the use of
Chimneys, Solid Fuel heaters,
Carbon Monoxide Poisoning,
Disposable BBQ’s and candles are
being communicated through Home
Fire Safety Visits, Social Media and
the SFRS website.  This will be a
priority throughout the upcoming
Thematic Action Plans.
Rural areas of Perth and Kinross is
are risk of wildfires, particularly in
the Summer season. Due to the
prolonged warm dry spells during
Q2 the SFRS attended several
wildfires across the P&K area and
the Community Action team used
Social Media to reinforce the
message on reducing the risk of
wildfire.
Page 28 of 250

Page 29

21
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
APPENDIX 2: NOTABLE INCIDENTS / EVENTS 
SFRS attended 597 incidents of which a  number would undoubtedly have had a serious impact
on members of our communities and their families, particularly from Road Traffic Collisions,
Dwelling Fires and other Special Service Calls. Some of the more notable incidents and events
are noted below:
Combine Harvester and field fire 
Flat Fire – Rannoch Road Perth 
19/08/22, Fire Crews from
Blairgowrie, Alyth, Perth and Dundee
were mobilised to Woodside Farm to
tackle a fire involving a Combine
Harvester. The attendance times
were short however by the time the
crews arrived the fire had spread to
two fields that had been freshly cut.
The crews worked hard in nearly 30
degree heat to bring the fire under
control quickly. Fires of this nature
aren’t unusual during the harvest
period.
27/07/22 crews from Perth and
Auchterarder responded to a fire in
a top floor flat on Perth’s Rannoch
Road. The fire, which started in the
kitchen, caused extensive damage
to the flat. The quick actions of the
initial crews ensured that the fire did
not spread to the roof and they
remained on scene for four hours to
ensure the fire was fully
extinguished.
Page 29 of 250

Page 30

22
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
Fire – Shore Recycling, Perth 
RTC A923 Coupar Angus 
04/09/22, crews from Perth,
Kinross, Coupar Angus, Dundee
and Fife attended a large fire at
Shore Recycling, Shore Road,
Perth. The fire started in a pile of
recycled materials and attracted
widespread coverage on media
platforms. Crews worked tirelessly
for over 24 hours to bring the
incident to a safe conclusion. 
12/07/22, two appliances from
Blairgowrie attended a RTC on the A923
at Coupar Angus. The two casualties
suffered minor injuries and were fortunate
to not have suffered more serious injuries,
they given a precautionary check by the
Scottish Ambulance Service. 
Page 30 of 250

Page 31

23
Local Fire and Rescue Plan for Perth & Kinross 2020 – Quarterly Monitoring of Performance
Page left intentionally blank 
Page 31 of 250

Page 32

Page 32 of 250

Page 33

OFFICIAL: POLICE AND PARTNERS 
OFFICIAL: POLICE AND PARTNERS 
PERTH AND KINROSS COUNCIL 
Housing and Communities Committee 
PERTH AND KINROSS LOCAL POLICING AREA
QUARTERLY POLICE REPORT 
1 July 2022 – 30 September 2022 
Report by Chief Superintendent Phil Davison
Police Scotland D Division (Tayside)
(Report No. 23/7) 
1. RECOMMENDATION 
1.1 It is recommended that members note and scrutinise the statistical information
contained in this report in conjunction with Appendix A. 
2. BACKGROUND 
2.1 The purpose of this report (Appendix A) is to provide information to the
Committee regarding the performance of Police Scotland to facilitate local
scrutiny. 
2.2 Appendix A will provide information in relation to some of the work which has
taken place within Perth and Kinross Local Policing Area. 
2.3 The content in this report is for information purposes to allow Members to
conduct their scrutiny responsibilities.   
3. FINANCIAL IMPLICATIONS 
3.1. There are no financial implications as a result of this report.   
4. STAFFING IMPLICATIONS 
4.1 There are no staffing issues as a result of this report. 
4(ii)
Page 33 of 250

Page 34

OFFICIAL: POLICE AND PARTNERS 
OFFICIAL: POLICE AND PARTNERS 
5. ENVIRONMENTAL ISSUES 
5.1 This report does not have any impact on the environment. 
6. SUMMARY 
6.1 The attached report updates members regarding significant operational matters
and performance of the local policing area. 
7. COMPLIANCE 
7.1 Is the proposal; 
(a) Human Rights Act 1998 compliant? YES 
(b) Equality & Diversity compliant? YES 
Page 34 of 250

Page 35

OFFICIAL 
OFFICIAL 
Perth and Kinross Council
Housing and Communities Committee 
Quarter 2 ending 30th September 2022
Chief Superintendent Davison  
4(ii)
Page 35 of 250

Page 36

OFFICIAL 
1
OFFICIAL 
Contents        
Page
Introduction and Overview of Local Policing Priorities   2
Plan on a Page – Perth & Kinross Local Policing Plan 2020-2023 3
Summary Report Perth & Kinross LPA               4
Violence, Disorder and Antisocial Behaviour                      5-13
Acquisitive Crime               14-18
Road Safety and Road Crime                         19-28    
Public Protection               29-34
Serious Organised Crime              35-38
Counter Terrorism and Domestic Extremism                39
Wildlife Crime                      40-41  
Complaints about the Police        42 
Appendix           43 
Page 36 of 250

Page 37

OFFICIAL 
2
OFFICIAL
Introduction and Overview of Local Policing Priorities 
As from April 2013, the Police and Fire Reform (Scotland) Act 2012 has required
Divisional Commanders to produce and publish a Local Policing Plan (LPP) for each
local authority area. The LPP clearly sets out the policing objectives for Perth & Kinross
Council and will report to the Housing and Communities Committee. 
Performance in relation to the identified policing objectives and outcomes is
monitored and reviewed at the monthly Tasking and Delivery Meeting.  Quarterly
reports are produced to allow scrutiny by Perth and Kinross Council Housing and
Communities Committee. This report covers the period from 1 June 2022 to 30
September 2022, however will focus on Year to Date (YTD) data from 1 April 2021 to
30 September 2021 and 1 April 2022 to 30 September 2022. 
Data provided in this report is for information purposes to allow Committee Members
to conduct their responsibilities under the Police and Fire Reform (Scotland) Act 2012. 
This report will make reference to specific crimes mentioned in the local policing plan,
which we refer to as our control strategy.
The information contained within this document compliments Force Priorities and
supports reporting through Community Planning Partnership structures.   
Page 37 of 250

Page 38

OFFICIAL 
OFFICIAL 
Local Priorities  Objectives Outcomes
Engage with the public and communities to reduce and
prevent crime
Reduce crime through preventing offending and
reducing re-offending 
Collaborate to reduce casualties and crime on our roads
Support people considered vulnerable through working
with partners     
Public 
Protection 
Wildlife 
Crime 
Acquisitive 
Crime 
Reduce harm caused to certain birds, animals and
plants including their habitats, both on land and at sea
Prevent, Pursue, Protect and Prepare through
collaborative preparedness
Reduce the harm caused by serious organised crime
including cyber related crime
Violence 
Disorder and
Antisocial
Behaviour
Road Safety 
And Road 
Crime
Serious
Organised 
Crime
Counter
Terrorism and
Domestic
Extremism
Threats to public safety and
wellbeing are resolved by a
proactive and responsive police
service
The needs of local communities are
addressed through effective service
delivery
The public, communities and
partners are engaged, involved and
have confidence in policing
Our people are supported through a
positive working environment,
enabling them to serve the public
Police Scotland is sustainable,
adaptable and prepared for future
challenges 
Plan on a Page – Perth & Kinross Local Policing Plan 2020-2023 
Our vision | Policing for a safe, protected and resilient Perth & Kinross
Our purpose | Improve the safety and wellbeing of people, places and communities in Perth & Kinross
Our Values  | Fairness | Integrity | Respect | Human Rights
Page 38 of 250

Page 39

OFFICIAL 
OFFICIAL 
Violence, Disorder and
Antisocial Behaviour   
Violence, Disorder and
Antisocial Behaviour 
Violence, Disorder and
Antisocial Behaviour 
Serious Assault 
Crimes Detect %
21/22 40 90.0%
22/23 36 72.2%
% +/- -10.0% -17.8% 
Robbery Inc Intent 
Crimes Detect %
21/22 17 76.5%
22/23 29 65.5%
% +/- +70.6% -11.0% 
Common Assault - Total 
Crimes Detect %
21/22 568 68.8%
22/23 650 69.4%
% +/- +14.4% +0.5% 
Violence, Disorder and
Antisocial Behaviour 
Acquisitive Crime Acquisitive Crime 
Emergency Services Assault 
Crimes Detect %
21/22 60 98.3%
22/23 61 98.4%
% +/- +1.7% 0.0% 
Housebreakings -Dwellings 
Crimes Detect %
21/22 37 32.4%
22/23 44 20.5%
% +/- +18.9% -12.0% 
Motor Vehicle Crime 
Crimes Detect %
21/22 116 32.8%
22/23 112 50.0%
% +/- -3.4% +17.2% 
Acquisitive Crime  Road Safety and 
Road Crime
Road Safety and 
Road Crime
Fraud 
Crimes Detect %
21/22 167 16.8%
22/23 216 13.4%
% +/- +29.3% -3.3% 
Speeding 
Crimes Detect %
21/22 1515 100.0%
22/23 529 100.0%
% +/- -65.1% 0.0% 
Drink/ Drug Driving 
Crimes Detect %
21/22 107 91.6%
22/23 70 90.0%
% +/- -34.6% -1.6% 
Road Safety and 
Road Crime
Road Safety and 
Road Crime
Public Protection
Road Deaths - All 
Crimes Detect %
21/22 3 N/A
22/23 3 N/A
% +/- 0.0% / 
Serious Injury - All 
Crimes Detect %
21/22 40 N/A
22/23 36 N/A
% +/- -10.0% / 
Rape Inc Assault with Intent 
Crimes Detect %
21/22 46 41.3%
22/23 30 80.0%
% +/- -34.8% +38.7% 
Public Protection Serious Organised 
Crime
Serious Organised 
Crime
Group 2 -  Sexual Crimes 
Crimes Detect %
21/22 187 48.7%
22/23 204 61.8%
% +/- +9.1% +13.1% 
Drugs Supply 
Crimes Detect %
21/22 63 76.2%
22/23 45 82.2%
% +/- -28.6% +6.0% 
Drug Possession 
Crimes Detect %
21/22 187 89.8%
22/23 124 104.0%
% +/- -33.7% +14.2% 
Summary Report Perth & Kinross LPA  
1st April 2022 to 30th September 2022 
The table below provides a summary of this year to date Vs last year to date figures for this
quarter in relation to crimes reported and crimes detected. This is an indication of the current
position and further detail and indicators are provided in the full scrutiny report. 
Page 39 of 250

Page 40

OFFICIAL 
5
OFFICIAL   
Murder
No murders were recorded during the reporting period. 
Attempted Murder
There have been two attempted murders recorded during the reporting period, both
of which were quickly detected.
2
1 1
0
2
0.8 0.6 0.6
0
2
4
Div Dundee Perth and Kinross Angus
Murder - Recorded Crime
2021/22 2022/23 5 Year Ave
110.7 100.0 100.0 100.0
0.0
104.35
0.00 0.00 0.00 0.00
0.0
50.0
100.0
150.0
Scotland Div Dundee Perth and Kinross Angus
Murder - Detection Rates
2021/ 22 2022/ 23
0.00 0.00 0.00 0.00
0.04
0.00
0.05
Div Dundee Perth and Kinross Angus
Murder - Rate Per 10,000 Population
2022/23 Scotland
This activity will link in with and support the Perth and Kinross
Community Plan 2017-2027 strategic priorities:
 Giving every child the best start in life
 Creating a safe and sustainable place for future
generations 
This also supports the delivery of Police Scotland’s strategic
outcome: 
 Threats to public safety and wellbeing are resolved
by a proactive and responsive police service
Page 40 of 250

Page 41

OFFICIAL 
6
OFFICIAL
The first of these incidents took place in a public street in City Centre area of Perth
whereby a 38 year old male sustained injuries when he was deliberately driven at by
a car.  Thankfully the injuries sustained were minor in nature, however the reckless
nature of the act and utter disregard for the potential consequences of striking
someone with a vehicle resulted in the crime being classified as an attempted murder.
The victim and perpetrator were known to each other prior to the offence taking
place and it is assessed this was linked to a wider family dispute.  
The investigation was led by Perth and Kinross Criminal Investigation Department and
a 53year old male was promptly arrested and charged with attempted murder and
other offences relating to linked incidents.  He is currently awaiting trial.
The second incident took place within a private dwelling in Perth City whereby a 50
year old female sustained injuries as a result of being attacked with a hammer.  
While this was not a domestic related incident the victim and perpetrator were known
to each other and the consumption of drugs and alcohol were significant factors in
the attack.  The victim was treated at hospital and is thankfully making a good
recovery.  
A 43 year old male from Perth was arrested at the scene of the incident, was charged
with the offence of attempted murder and is awaiting trial.
These incidents bring the total number of recorded attempted murders recorded YTD
to 4, an increase of 2 crimes when compared to the previous year.  In the majority of
cases recorded this year the injuries sustained by victims have been relatively minor,
however the nature of the assault and, in particular, the use of vehicles as weapons
on 2 occasions has led to these crimes being classified as attempted murders.
The use of vehicles is not commonplace and perhaps highlights the spontaneous
nature of some of the offences with perpetrators using items readily to hand as
weapons.
The serious nature of these offences means investigations are usually led by our local
Criminal Investigation Department under the oversight of the locality Detective
Inspector, who is an experienced and qualified Senior Investigating Officer (SIO).
This focus and governance is reflected in the performance in this area with detection
rates sitting at 75% at the end of the reporting period.  1 incident remained under
active investigation at the end of the reporting period, however this has now also
been brought to a successful conclusion with the offender being charged and
remanded in custody awaiting trial. 
2 1 0 1
14
8
4 24 1.8 1 1.2
0
5
10
15
Div Dundee Perth and Kinross Angus
Att Murder - Recorded Crime
2021/22 2022/23 5 Year Ave
Page 41 of 250

Page 42

OFFICIAL 
7
OFFICIAL 
Serious Assault
All crimes of Serious Assault are subject to a review from a Detective Sergeant, CID to
ensure all pertinent enquiries are identified and prioritised and appropriate measures
are in place to safeguard victims.  
Where violent offenders are subject to bail curfews or special bail conditions in respect
of their offences, bail compliance checks are carried out and any breaches are
reported.
Prison releases are monitored and locality officers carry out proactive visits to
discourage re-offending and ensure any support required is highlighted via the
Preventions Interventions and Partnerships team.
Occurrence rates for Serious Assaults remain lower than LYTD with 4 fewer crimes
recorded than during the same period in 2021/22.  This occurrence rate is lower than
the 5 year average and below the national rate per head of population.
Of the 19 serious assaults recorded during the reporting period 9 occurred in public
spaces, 2 occurred within HMP Perth and the remainder occurred in private dwellings.
In the majority of cases the victim and offender were known to each other prior to the
offence taking place – including incidents within domestic or other familial settings.
Five crimes were perpetrated using a weapon.
We have seen a marked improvement in detection rates during Q2 which have risen
from 53.8% in Q1 to 72.2% at the end of Q2, albeit this remains lower than LYTD.
95.70
200.00 200.0
0.0
200.0
97.22 85.71 87.5 75.0 100.0
0.00
100.00
200.00
300.00
Scotland Div Dundee Perth and Kinross Angus
Att Murder - Detection Rates
2021/22 2022/23
0.34 0.5
0.3 0.20.26
0.00
0.50
1.00
Div Dundee Perth and Kinross Angus
Att Murder - Rate Per 10,000 Population
2022/23 Scotland
Page 42 of 250

Page 43

OFFICIAL 
8
OFFICIAL
11 cases remain under active investigation and it is anticipated we will see further
improvements in the detection rate as these investigations are brought to a
conclusion. 
Common Assault
There were 340 common assaults recorded during the reporting period, an increase
of 30 over Q1 and brings the total for the year to 650.  This is an increase of 82 over
LYTD. 
These figures include Domestic Assaults and Assaults on Emergency Service Workers.
Although there has been an increase in the number of common assaults recorded
occurrence rates in Perth and Kinross remain below both divisional and national
averages per head of population.  
25% of the common assaults recorded during this period relate to domestic offending
and, as per previous reporting a number of these are considered non-recent in nature
i.e. the offence occurred more than 12 months prior to being reported to police. 
137
69 40 28
146
78
36 32
143
74.4
39.6 29
0
100
200
Div Dundee Perth and Kinross Angus
Serious Assault - Recorded Crime
2021/22 2022/23 5 Year Ave
75.0 86.1 85.5 90.0 82.176.8 77.4 79.5 72.2 78.1
0.0
50.0
100.0
Scotland Div Dundee Perth and Kinross Angus
Serious Assault - Detection Rates
2021/22 2022/23
3.50
5.20
2.40 2.803.09
0.00
2.00
4.00
6.00
Div Dundee Perth and Kinross Angus
Serious Assault - Rate Per 10,000 Population
2022/23 Scotland
Page 43 of 250

Page 44

OFFICIAL 
9
OFFICIAL
Police Scotland continues to encourage historical reporting of these crime types to
promote the safety of domestic abuse victims.
The locations of these incidents varies with a broadly equal split of 45% of offences
occurring in private spaces and 55% occurring in public spaces.  The majority of public
space offences took place outside, however we have seen a small number occurring
in licensed premises.
Alcohol and drugs remain a factor in a proportion of common assaults as well as other
crimes of violence and disorder.  In Perth, Operation Centresafe runs on a Friday and
Saturday and provides a dedicated resource to patrol the city centre of Perth in and
around licensed premises during the Night Time Economy.  We have recently carried
out a similar operation in Blairgowrie, utilising local officers and support from other
divisional resources.
The age range of offenders varies between 11 years old to 63 years old with the
majority of offenders, 75%, being males.  60% of offenders are between 26 and 45
years old.
We continue to actively target repeat and prolific offenders, ensuring that all
opportunities to detect or disrupt their offending are taken and, where vulnerabilities
are identified they are signposted to relevant support from partner agencies in an
effort to divert them away from further offending.
The detection rate for this crime type remains largely static, however is currently above
both the divisional and national rates. 
2353
1197
568 588
2434
1179
650 605
2261.4
1144
523 594.4
0
1000
2000
3000
Div Dundee Perth and Kinross Angus
Common Assault (Total) - Recorded Crime
2021/22 2022/23 5 Year Ave
66.60
70.60 70.30 68.80
73.00
68.09 67.46
64.40
69.40
71.40
60.00
65.00
70.00
75.00
Scotland Div Dundee Perth and Kinross Angus
Common Assault (Total) - Detection Rates
2021/22 2022/23
Page 44 of 250

Page 45

OFFICIAL 
10 
OFFICIAL 
Robbery
This section includes crimes of Robbery, Assault and Robbery, and assaults with intent
to Rob.  Any threat or inference of violence of any kind is sufficient for incidents to be
recorded.
The response to Robberies remains a Divisional priority and all activity is aligned to the
Robbery Action Plan. A Robbery toolkit has been developed to ensure consistency of
investigative practice and provision of support to victims.
A dedicated Perth & Kinross Detective Inspector maintains oversight of all robberies
and ensures a CID input from the initial reporting. The majority of robberies are
investigated by detective officers.
The focus remains on prevention with proactive activity aligned to geographic areas
where higher levels of violent crime are seen, targeting those who are wanted on
warrant for serious and violent crime to ensure early arrests are made.  We also work
closely with colleagues from our Divisional Partnerships Interventions and Preventions
(PIP) team to support victims through housing, welfare and signposting to health and
social care to prevent recurrence and target harden by enhancing physical security
measures.
There were 18 robberies recorded during the reporting period, which brings the YTD
total to 29.  This is an increase of 12 additional crimes when compared to LYTD.
Analysis of these crimes (Q2) has shown that ten occurred in Public Spaces with the
remainder occurring within a private dwelling. 
In the majority of cases the victim and perpetrator were known to each other prior to
the offence occurring. 
The detection rate for the YTD sits at 65.5%, lower than LYTD rate of 76.5%. Again, six
crimes remain under active investigation and it is anticipated the detection rate will
improve as these investigations as brought to a conclusion.   
58.30
79.00
42.80 52.1054.14
0.00
50.00
100.00
Div Dundee Perth and Kinross Angus
Common Assault (Total) - Rate Per 10,000 Population
2022/23 Scotland
Page 45 of 250

Page 46

OFFICIAL 
11 
OFFICIAL 
Vandalism
We have seen a reduction in the occurrence rate for vandalism in comparison with
LYTD (9 fewer crimes) and detection rates remain broadly in line with the National
average.
Offences are sporadic in nature with no particular themes or trends identified,
however we continue to work closely with partners in Safer Communities to ensure any
issues or areas of concern are identified at the earliest opportunity. 
119 76
17 26
104 69 29 6
94.2 65
14.4 14.8
0
100
200
Div Dundee Perth and Kinross Angus
Robbery - Recorded Crime
2021/22 2022/23 5 Year Ave
73.00 72.30 73.70 76.50
65.40
74.43
66.35 66.70 65.50 66.70
50.00
60.00
70.00
80.00
Scotland Div Dundee Perth and Kinross Angus
Robbery - Detection Rates
2021/22 2022/23
2.49
4.60
1.90
0.501.36
0.00
5.00
Div Dundee Perth and Kinross Angus
Robbery - Rate Per 10,000 Population
2022/23 Scotland
1610
813
445 352
1464
731 393 340
1705.8
876.2
423 406.6
0
1000
2000
Div Dundee Perth and Kinross Angus
Vandalism - Recorded Crime
2021/22 2022/23 5 Year Ave
Page 46 of 250

Page 47

OFFICIAL 
12 
OFFICIAL 
Stop Search
Stop and Search is an operational policing tactic in the prevention, investigation and
detection of crime, with the intention of keeping people safe and improving
community wellbeing. Stopping and searching members of the public is a significant
intrusion into their personal liberty and privacy and Police Scotland are committed to
ensuring that when it is necessary to stop and search a person it is carried out in a
manner that is lawful, proportionate and accountable.  
Officers will explain why they have stopped an individual before any search and
explain what they are looking for. After the search, officers will provide the individual
with a receipt for the search, which contains information about their rights and how
they can access a copy of their stop and search record. 
In the reporting period 112 stop searches were conducted with items including
weapons and drugs recovered on 54 occasions, which equates to a positive rate of
48.2%.
Assurance reports are provided monthly which show no disproportionate searching
was carried out of persons under 18, nor did any disproportionate searching take
place around minority groups. 
27.2
40.8 43.1 40.4 36.127.8 26.5 23.5 29.0 30.0
0.0
20.0
40.0
60.0
Scotland Div Dundee Perth and Kinross Angus
Vandalism - Detection Rates
2021/22 2022/23
35.07
49.00
25.90 29.3035.29
0.00
10.00
20.00
30.00
40.00
50.00
60.00
Div Dundee Perth and Kinross Angus
Vandalism - Rate Per 10,000 Population
2022/23 Scotland
Page 47 of 250

Page 48

OFFICIAL 
13 
OFFICIAL
Ethnicity Breakdown for Q2 YTD
2022/23      
Ethnicity Negative Positive Total
White Scottish 41 39 80
White British Other 4 5 9
White Irish 0 1 1
White Polish 1 0 1
White Other 1 9 10
Any Mixed Ethnic Group 2 2 4
Indian 0 1 1
Asian Other 1 0 1
Black, Black Scottish or Black British 3 1 4
Not Provided 1 0 1
Total 54 58 112 
228
123
58 47
261
153
54 54
0
100
200
300
400
500
600
Division Dundee Perth & Kinross Angus
Stop/ Search 2022/23
Positive Negative
Page 48 of 250

Page 49

OFFICIAL 
14 
OFFICIAL 
Domestic Housebreaking
The figures for Housebreaking includes all attempted housebreaking and instances of
housebreaking with intent to steal (i.e. where the security of the property has been
overcome but no property stolen).
While occurrence in Perth and Kinross remain below both divisional and national
averages (per head of population) instances of domestic housebreaking have
continued to increase, albeit the rate has reduced considerably from over 90% in Q1
to 18.9% at the end of Q2 (7 additional crimes when compared with LYTD).  
A number of factors may have contributed to this including the return to this type of
criminality from perpetrators who had targeted other crime types during the
pandemic, reduced security during the summer months with families leaving
properties unoccupied during holiday periods. In addition there has notably been an
increase in perpetrators travelling from out with the Tayside area with the rural areas
of Perth and Kinross and areas close to arterial routes being particularly targeted.
The Community Investigation Unit continue to prioritise domestic housebreaking along
with other associated acquisitive crime, predominantly motor vehicle crime. The CIU
has oversight of all housebreakings within the locality and leads the response in line
with the Housebreaking Toolkit, ensuring a robust response to all reported crime.
Priority enquiries continue to focus around CCTV and forensic opportunities to
maximise the impact of these investigative tools. Along with the CID locality model
the dedicated Detective Inspector maintains supervision of the CIU providing
consistency and continued analysis of methods, hot spot areas and prolific offenders.
To combat travelling criminals the Division links in with counterparts in Fife and Central
Scotland to share, information on overnight crime and this sharing of information and
intelligence is replicated with other areas throughout Scotland via a national
Acquisitive Crime Forum.
Detection rates have seen a marked increase from 12% at the end of Q1 to 20.5% at
the end of Q2.  This remains lower than LTYD, however a number of crimes remain
under active investigation and it is anticipated we will see further improvements in
performance in this area as these are brought to a conclusion.
This activity will link in with and support the Perth and Kinross
Community Plan 2017-2027 strategic priorities:
 Creating a safe and sustainable place for future
generations
This also supports the delivery of Police Scotland’s strategic
outcome: 
 Threats to public safety and wellbeing are resolved by a
proactive and responsive police service 
Page 49 of 250

Page 50

OFFICIAL 
15 
OFFICIAL 
Fraud
A total of 216 Frauds have been recorded year to date, with 116 recorded during Q2.
This continues with the national theme of the crime of fraud increasing. This has been
a common theme since the first lockdown in 2020 where perpetrators sought different
ways to fund their criminal behaviour. As in previous reporting periods, a number of
these crimes continue to be perpetrated online as internet usage increases. A variety
of apps are used along with ever changing schemes to exploit vulnerable and less
technologically aware. 
As stated, total reports YTD are at 216 which is significantly higher than the 167
recorded by the end of Q2 last year and over double the 5 year average of 90.4.
Analysis of these crimes shows 64 crimes (30%) have the ‘cybercrime’ tag indicating
an ‘online’ element. Most of these ‘cybercrimes’ (at least 70%) target individuals at
their home address although three cases involve businesses.
206
131
37 38
183
103
44 36
196.4
122
39 35.4
0
100
200
300
Div Dundee Perth and Kinross Angus
Domestic HB (Dwelling) - Recorded Crime
2021/22 2022/23 5 Year Ave
22.3
30.6 29.8 32.4 31.6
22.34 26.23 26.2 20.5
33.3
0.0
20.0
40.0
Scotland Div Dundee Perth and Kinross Angus
Domestic HB (Dwelling) - Detection Rates
2021/22 2022/23
4.38
6.9
2.9 3.13.96
0.00
2.00
4.00
6.00
8.00
Div Dundee Perth and Kinross Angus
Domestic HB (Dwelling) - Rate Per 10,000 Population
2022/23 Scotland
Page 50 of 250

Page 51

OFFICIAL 
16 
OFFICIAL
Detecting frauds carries significant challenges and involve protracted enquiries
involving multiple agencies and institutions. 
Further to this 70 enquiries remain under live investigation with the likelihood that
further crimes will either be detected or transferred out of P&K as the criminality has
taken place elsewhere in the UK or even abroad.
As per previous reporting periods the complexities of online crime continue to provide
challenges with many of the software applications used located out with the UK
adding additional time delays and barriers to obtaining information. Likewise many of
the perpetrators of these crimes are located out with the UK providing an additional
barrier to their identification and opportunities to bring to justice.
Our response to Fraud remains consistent with the previous work of the Fraud Working
Group continuing to focus on prevention and support to victims and we continue to
link in with partners ensuring collaboration round consistent messaging. 
550
265 167 118
770
405 216 149
360.8 199 90.4 71.4
0
500
1000
Div Dundee Perth and Kinross Angus
Fraud - Recorded Crime
2021/22 2022/23 5 Year Ave
16.28 17.5 18.9 16.8 15.316.0 16.23 15.3 13.4
22.8
0.00
10.00
20.00
30.00
Scotland Div Dundee Perth and Kinross Angus
Fraud- Detection Rates
2021/22 2022/23
18.44
27.10
14.20 12.8016.23
0.00
10.00
20.00
30.00
Div Dundee Perth and Kinross Angus
Fraud - Rate Per 10,000 Population
2022/23 Scotland
Page 51 of 250

Page 52

OFFICIAL 
17 
OFFICIAL
Theft by Shoplifting
There have been 268 crimes recorded YTD with 126 occurring during Q2, this
represents an increase of 16 crimes when compared with LYTD. 
Analysis shows that during this reporting period 58% of crimes occurred within Perth
city centre 22% in North Perthshire and 20% in South Perthshire.
Detection rates have improved slightly over Q1 however remain below LYTD.
The Divisional Preventions Officers continue to liaise with the retail sector and offer
crime prevention advice in respect of stock placement within premises in order to
reduce this type of crime being committed. 
Motor Vehicle Crime
All acquisitive crimes are reviewed on a daily basis and discussed and where crime
series are identified investigations are prioritised and local officers are supported by
the Community Investigation Unit and Locality CID.  All forensic opportunities are
maximised in an effort to quickly identify and arrest perpetrators and we work closely
858
451 252 155
1289
832
268 189
1060.4
589.6
304 166.8
0
500
1000
1500
Div Dundee Perth and Kinross Angus
Theft by Shoplifting- Recorded Crime
2021/22 2022/23 5 Year Ave
57.1 46.9 37.0
59.1 55.554.06 48.41 43.3 50.0 68.8
0.0
50.0
100.0
Scotland Div Dundee Perth and Kinross Angus
Theft by Shoplifting - Detection Rates
2021/22 2022/23
30.88
55.70
17.60 16.3025.89
0.00
50.00
100.00
Div Dundee Perth and Kinross Angus
Theft by Shoplifting - Rate Per 10,000 Population
2022/23 Scotland
Page 52 of 250

Page 53

OFFICIAL 
18 
OFFICIAL
with colleagues in our Partnerships, Interventions and Preventions department to offer
advice in relation to crime prevention and target hardening.
We also continue to actively manage known perpetrators, including those individuals
previously mentioned in our Q1 report who had been responsible for an increase in
vehicle crime in the Perth area.
This activity has seen positive results with occurrence rates for motor vehicle crime
decreasing in Perth and Kinross (4 fewer crimes when compared to LYTD) at a time
when we have seen marked increases elsewhere in the Division. 
On another positive note, the detection rate for motor vehicle crime at the end of Q2
was 50% - well over the same period last year (32.8%) and very favourable in
comparison to the national detection rate of 28.0%.   
537
303
116 118
696
464
112 120
469.6
284
113.4 72.2
0
500
1000
Div Dundee Perth and Kinross Angus
Vehicle Crime - Recorded Crime
2021/22 2022/23 5 Year Ave
29.1 29.2 24.1 32.8 39.027.96 29.6 23.1
50.0
35.8
0.0
20.0
40.0
60.0
Scotland Div Dundee Perth and Kinross Angus
Vehicle Crime - Detection Rates
2021/22 2022/23
16.67
31.10
7.40 10.3010.60
0.00
10.00
20.00
30.00
40.00
Div Dundee Perth and Kinross Angus
Vehicle Crime - Rate Per 10,000 Population
2022/23 Scotland
Page 53 of 250

Page 54

OFFICIAL 
19 
OFFICIAL 
Operation CEDAR
The principles of Operation CEDAR will be applied in the following ways across Tayside,
linked to priority areas of focus:
Challenge  Build effective partnership working and methods to develop new and
innovative ways to improve road safety. Improve information sharing
and analysis to support an evidence-led approach   
Educate  Deliver and evaluate educational initiatives to driver and road user
behaviour, making effective use of media opportunities to highlight
CEDAR and the work of the forum   
Detect  Provide an intelligence-led and multi-agency approach to
enforcement, supported by analytical products, to make the best use
of available resources   
Reduce  Ensure all road safety education, engineering and enforcement
activity is focused on having the maximum positive impact on
reducing the number of people killed and seriously injured   
The implementation of Operation CEDAR across Tayside and delivery of our Action
Plan provides an opportunity to contribute to a consistent approach across the north
of Scotland. It will refocus our efforts to further improve safety on Tayside’s roads and
promote active travel.
However, while the individual road safety plans produced by each local authority will
primarily reflect local needs, they will also have strong linkages with the CEDAR
strategy and work in tandem towards the achievement of the overarching outcome
and its longer term vision.  Importantly, the strategy is not intended as a replacement
for such plans. 
Statistical evidence shows that road casualty trends can vary quite significantly,
sometimes for no apparent reason.  A road user group who are shown to be
particularly vulnerable during the course of several years, with involvement in
increased levels of collisions, can move to a more favourable position over a relatively
short time period.
This activity will link in with and support the Perth and Kinross
Community Plan 2017-2027 strategic priorities:
 Giving every child the best start in life
 Creating a safe and sustainable place for future
generations 
This also supports the delivery of Police Scotland’s strategic
outcome: 
 The needs of local communities are addressed through
effective service delivery 
Page 54 of 250

Page 55

OFFICIAL 
20 
OFFICIAL 
While this may be because of concerted preventative activity, it can also occur for
reasons which are less clear.  Partners need to remain alert to changing trends and
be able to respond effectively to meet new challenges. 
Tragically Perth & Kinross LPA have suffered 2 adult fatalities for the period under
review
The first incident occurred on the 12th August 2022 on the A90 Perth to Dundee
road near to the junction leading to Errol.  A 32 year old female passenger lost
her life when the vehicle she was travelling in left the road and collided with a
tree. 
The second fatality occurred on the 16th of September 2022 on the A9 Pitlochry
to Perth road near to Dowally.  Tragically a 69 year old female driver of a car lost
her life when the vehicle she was driving lost control and collided with a vehicle
travelling in the opposing direction.  The deceased was on holiday in the UK and
was an American national, the passenger in the vehicle was also seriously injured
however is now making a slow but steady recovery.
This takes Tayside Divisions total number of fatalities year to date to 3, which is the
same as LYTD.
Perth & Kinross LPA have had 36 persons seriously injured as a result of collisions
which is a 10% decrease comparable with the same period last year where we
saw 40 person seriously injured.
Unfortunately, Perth & Kinross LPA have had a very slight increase of 7% in persons
slightly injured as a result of road traffic collisions.
Road Safety enforcement continues to be carried out as part of routine business
by the Road Policing Unit in Perth & Kinross LPA. Focused patrol work will be
complemented by the use of available technology and databases, intelligence
target packages and specific tasking resulting from local Tasking & Coordinating
processes to tackle criminality.  
Local Policing and RPU Officers have been able to target driving behaviour which
we believe will have the greatest impact on casualty reduction and address
community concerns.  Enforcement activity has concentrated on the Fatal 5
which are Dangerous/careless driving, drink/drug driving, Speeding, Seatbelts
and mobile phones.    
Based on strategic assessment a number of priority locations have been
identified within in Perth & Kinross which were subject to focussed operation
activity.
Tayside Division priority routes include the following roads; 
M90/A90  (Perth & Kinross LPA)
A9  (Perth & Kinross LPA)
A923   (Perth & Kinross LPA)
A93  (Perth & Kinross LPA)
Page 55 of 250

Page 56

OFFICIAL 
21 
OFFICIAL
A85   (Perth & Kinross LPA)
A92   
For the period under review, Road Policing Officers have stopped a total of 7568
motorists across the Tayside area. 
During the period under review Road Policing officers took part in a number of
National Campaigns; 
July 2022    Summer Drink/Drug Drive campaign 
Commercial vehicle week 
Motorcycle Safety campaign      
August 2022   Drug Driving week 
September 2022  Vulnerable road users 
Project EDWARD 
In Perth & Kinross LPA notable speeds recorded for the period under review were; 
115 mph exceed 70mph limit
107 mph exceed 70mph limit
101 mph exceed 70 mph limit
91 mph exceed   60 mph limit
73 mph exceed 50 mph limit 
Road Policing officers continue to provide high visibility and support to divisional
officers throughout the Perth & Kinross area.   It is recognised that positive
engagement with road users is vital in order to improve driver and road user
behaviour.
Police resources are being challenged by the driving habits of vulnerable road
users.  By effectively working with Partners, the aim is to create a safer Tayside by
effectively working together to make the roads in Tayside safer for all users.
Safer roads
 Considering all road users and providing for the most vulnerable (elderly &
young drivers, motorcyclists and pedestrians when maintaining or making
changes to our road network. (2022 highlighted a significant number
Scotland’s fatalities involved foreign drivers)
 Understanding where accidents are happening in the region and seeking to
address problems.
Page 56 of 250

Page 57

OFFICIAL 
22 
OFFICIAL
 Addressing speeding by reducing speed limits, detection, engineering and
education.  
Safer people
 Providing education, training and campaigns on key road safety issues
including walking, driver behaviour and motorcycle safety.
 Targeting the delivery of road safety information to the people and places
where it is most needed. 
Safer vehicles
 Making sure that the vehicles on our roads are safe and fit for purpose.
 Working with partners to tackle unsafe driving practices including speeding,
not wearing seatbelts, driving under the influence of drink or drugs, using a
mobile phone and driving without insurance. 
NDS
The New driver Scheme (NDS) has been successfully delivered in a number of
educational establishments within the Perth and Kinross area.
The NDS is a hard-hitting presentations to raise awareness of road safety issues.
The joint presentations, delivered by Police Scotland and the Scottish Fire and
Rescue service, will provide a solid reminder of the individual responsibilities that
the driver has, both for themselves and for other road users.
It is hoped the scheme will be delivered Tayside wide in 2023. 
Rider Refinement North (RRN)
The Launch of Rider Refinement North (RRN) is set to run from the 21st May 2022 through
to October 2022 with 8 sessions being scheduled.  RRN is an opportunity for members
of the public to purchase a day’s motorcycle awareness with Road Policing
Advanced Riders accompanied by an observer from the IAM.  
The course includes a presentation, demo rides and observational rides, the course is
designed as a gateway to advanced riding and is run in partnership with Local
Authority, Road Safety Scotland, IAM & RoSPA.  The course costs attendees £40 which
includes a lunch.  Unfortunately demand always exceeds supply with only limited
places available.   Initial delivery of RRN has received extremely positive feedback
Page 57 of 250

Page 58

OFFICIAL 
23 
OFFICIAL
with some excellent learning and opportunity to influence riding behaviour with
candidates travelling from across Tayside to participate.
As RRN has been refreshed, the 2022 season is being evaluated by Caroline Hood
from Robert Gordon University, we look forward to the evaluation report. 
National Motorcycle Campaign
The National motorcycle campaign continues and will again see RP focussed patrols
on priority motorcycle routes throughout the division with joint working with
neighbouring divisions and the SCU to detect and deter any motorcycle offences.  C
division have recently launched an unmarked motorcycle initiative which on first
outing was very successful, as such efforts are being made to utilise similar techniques
within Tayside Division, this includes a media strategy prior to deployment. 
Operation Closepass
Operation Closepass has again been delivered in Perth & Kinross LPA by Road Policing
Officers, the message is that everyone deserves to be able to use Scotland’s roads
safely, and it is for all road users to take responsibility, whether they are on two, four or
more wheels, powered or on foot. 
Driver Engagement North 
Driver engagement north will be held across Tayside in the forthcoming months where
older drivers and their families will be able to take part in an interactive driving session. 
Driver engagement is aimed at highlighting potential driving weaknesses the Driver
Engagement North project makes use of an interactive driving simulator to assess and
highlight a participant's reactions, hazard awareness and any potential vulnerabilities.
The event has already been held at Dobbie’s Perth, and was a resounding success
with a number of positive interactions and a number of people finding the simulator
slightly more difficult than first anticipated. 
5
0
3
2
3
0
3
0
0
2
4
6
Div Dundee Perth and Kinross Angus
People Killed
2021/22 2022/23
Page 58 of 250

Page 59

OFFICIAL 
24 
OFFICIAL 
Speeding
During the period under review, speeding offences in Perth and Kinross have
significantly decreased by 65%, this is significantly lower than the 5 year average.
This is attributable to the focused operational activity on not only the priority routes
but also focused patrols on routes which are deemed to have speeding issues and
have been identified through a number of community based engagements.
The Safety Camera Unit (SCU) have utilised a number of flexible deployment sites
following localised complaints which has had a significant impact of influencing driver
behaviour.
Additionally the removal of a number of temporary average speed detection
cameras on the A9 will have an impact on the number of detections.  This said specific
patrols have been dedicated to the A9 and most motorists are abiding by the speed
parameters in place.
Divisionally Tayside as a whole have had a significant decrease with a total of 929
offenders detected which equates to a 67% reduction compared to the same period
the previous year.
It is considered reasonable to assume that due to the price increase on fuel may be
a correlating factor with a reduction of vehicles on Scotland’s road network, however
this is yet to be confirmed. 
88
19
40 29
68
13
36
19
0
20
40
60
80
100
Div Dundee Perth and Kinross Angus
People Seriously Injured
2021/22 2022/23
6
1
3 2
8
5
1
3
0
2
4
6
8
10
Div Dundee Perth and Kinross Angus
Children Seriously Injured
2021/22 2022/23
Page 59 of 250

Page 60

OFFICIAL 
25 
OFFICIAL
Activity
The detection of offenders falls in to the daily remit of Road Policing Officers.   A
number of cross border joint speeding initiatives have been executed with a
significant number of offenders detected.
Close working relationships continue with N, NE, P and C Division, all of which have 
demonstrated excellent cross border understanding with a number of high profile
detections being made.
Partnership working with the SCU continues with a number of priority routes being
targeted, increasing visibility is essential to improve driver and road user behaviour. 
Results
During the period under review 529 speeding offences were detected in Perth &
Kinross, which is a significant decrease compared to the year previous, this figure also 
remains below the 5 year average. 
2819
598
1515
706929
125 529 275
2432.4
631.4 1116 685
0
1000
2000
3000
Div Dundee Perth and Kinross Angus
Speeding Offences - Recorded Crime
2021/22 2022/23 5 Year Ave
99.3
100 100 100 99.999.81 99.89 100 100 99.6
98.0
99.0
100.0
101.0
Scotland Div Dundee Perth and Kinross Angus
Speeding Offences - Detection Rates
2021/22 2022/23
22.25
8.40
34.80
23.70
16.40
0.00
10.00
20.00
30.00
40.00
Div Dundee Perth and Kinross Angus
Speeding Offences - Rate Per 10,000 Population
2022/23 Scotland
Page 60 of 250

Page 61

OFFICIAL 
26 
OFFICIAL
Drink/Drug Driving
During the period under review, Drink, Drug offences in Perth & Kinross LPA have
experienced a significant decrease of 34.6% compared to the same period of
last year, this is extremely positive.  This is also significantly lower than the 5 year
average.
It should be noted that all three Tayside LPA’s recorded a decrease in Drink/Drug
driving for the period under review which is extremely positive.
Across Tayside Division 221 Drink/drug driver detected for the period under
review, this is a significant decrease of 39.5% comparable to the data from the
previous year, again which is extremely positive.
Road Policing officers within Tayside Division year to date have conducted 370
breath tests and carried out 75 drug wipes, 25 which have proved to be positive
with all offenders being reported to the procurator Fiscal for consideration. 
Activity  
The detection of drivers who are impaired through either Alcohol or Drugs falls in to
the daily business for Road Policing.   However during the period under review Road
Policing officers took part in the national Drink/Drug Driving & Drug Driving week
campaigns. 
As we can see from the breakdown above, the drug wipe testing kit will continue to
be an exceptionally effective tool in the continual fight against impaired driving with
a considerable number of positive wipes throughout Tayside Division.
Focus is not only targeting offenders driving immediately after consuming alcohol
or drugs, but also focusing on offender’s drive the morning after being under the
influence.  
Effective use of the media to raise awareness and to actively the encourage
changes in driving attitudes and behaviour.  A number of media appeals were
released throughout the duration of the Campaign.   
Results  
During the period under review 70 drink/drug drivers were detected within the
Perth & Kinross area.   This is a significant decrease of 34.6% compared to the
previous year. 
Challenges  
Irrespective of Police campaigns and reinforcement through varying mediums,
evidence suggests the message does not appear to be hitting home and some road
users are continuing to drive whilst under the influence which is completely
unacceptable.
Page 61 of 250

Page 62

OFFICIAL 
27 
OFFICIAL 
Careless Driving
Perth & Kinross LPA saw a significant 30% decrease in Careless driving compared to
the same period last year.  This figure is significantly lower than the 5 year average.
Tayside Division also experienced a significant decrease with 248 offenders being
detected which equates to a 34.4% decrease comparable with the same period the
year previous.
Additionally, it is considered reasonable to assume that due to the price increase on
fuel duty may be a correlating factor with a reduction of vehicles on Scotland’s road
network, however this is yet to be confirmed.
Part of the key to reducing Careless driving figures focus on Influence driver and road
user behaviour.
By focusing on the ‘Fatal 5’ and working with partners, Tayside Division road Policing
Unit make appropriate use of existing and new legislation to carry out enforcement,
365
178
107 80
221
103 70 48
311
137.2 104.6 69.2
0
200
400
Div Dundee Perth and Kinross Angus
Drink, Drug offences incl failure to provide specimen of breath -
Recorded Crime
2021/22 2022/23 5 Year Ave
84.3 88.2 88.8 91.6 82.592.68 101.81 107.8 90.0 106.3
0.0
100.0
200.0
Scotland Div Dundee Perth and Kinross Angus
Drink, Drug Offences incl failure to provide specimen of breath -
Detection Rates
2021/22 2022/23
5.29
6.9
4.6 4.1
7.10
0.00
2.00
4.00
6.00
8.00
Div Dundee Perth and Kinross Angus
Drink, Drug Offences incl failure to provide specimen of breath -
Rate Per 10,000 Population
2022/23 Scotland
Page 62 of 250

Page 63

OFFICIAL 
28 
OFFICIAL
education activates and influence the provision of engineering solutions (3 E’s).  This
will be enhanced with specific initiatives prioritising vulnerable road users and those
at greatest risk. 
Activity
Tayside Division Road Policing teams will continue to focus on the key KSI (Killed /
Seriously Injured) routes as part of the high visibility daily patrols.  
These are;  D Division – A9, A93, A923, A85, A92 and M90/A90
Many of the aforementioned priority routes running through Perth & Kinross.
This is reinforced with Route Strategy Days based on the previous collision data for the
month and involve multiple units carrying out high visibility patrolling of the same route. 
Where these routes traverse multiple Divisions we utilise cross border joint operations.
As is with all our operations, they are supported by partner agencies and road
operating companies which maximises potential. 
378
136 157
85
248
91 110
47
350.8
141 133.4 76.4
0
200
400
Div Dundee Perth and Kinross Angus
Driving Carelessly- Recorded Crime
2021/22 2022/23 5 Year Ave
87.3 89.7 91.2 89.8 87.187.93
83.87 84.6 83.6 83.0
75.0
80.0
85.0
90.0
95.0
Scotland Div Dundee Perth and Kinross Angus
Driving Carelessly - Detection Rates
2021/22 2022/23
5.94 6.1
7.2
4.0
8.72
0.00
5.00
10.00
Div Dundee Perth and Kinross Angus
Driving Carelessly - Rate per 10,000 Population
2022/23 Scotland
Page 63 of 250

Page 64

OFFICIAL 
29 
OFFICIAL 
Domestic Abuse
Domestic Abuse remains a priority for the Division and all domestic incidents in Perth
& Kinross are subject of review, both by local management and the Divisional
Domestic Abuse Investigation Unit (DAIU).  Priority is given to the arrest of any
outstanding perpetrators, who are routinely traced and arrested within 24/48 hours of
a crime being reported and we continue to work closely with partner agencies to
ensure appropriate safeguarding measures are in place for victims. 
The figures in the table below represent crimes recorded under the Domestic Abuse
(Scotland) Act (DASA) 2018. 
There has been an increase in DASA crimes recorded in Perth & Kinross compared to
2020/2021 (5 additional crimes).  This increase may be attributable to improvements
made in our response to Domestic Abuse, including an uplift of specialist Domestic
Abuse Officers dedicated to Perth & Kinross. This increase in specialist resource has
allowed us to enhance our response to Domestic Abuse with additional guidance
being provided to response officers in relation to the identification of the often hidden
coercive and controlling behaviour DASA offences.  It has also enabled the
introduction of a revised quality assurance process for all domestic crimes and
incidents to ensure that the service we deliver to victims is in accordance with national
standards.
The detection rate for DASA offences has seen an improvement on the 2020/21 figure.  
A small number of DASA offences, which are undetected, remain under active
investigation by Local Perth & Kinross officers and colleagues from Specialist units,
including the DAIU and the Domestic Abuse Task Force.  A number of these
outstanding enquiries form part of more complex investigations, which can be
protracted in nature. 
The level of reported Domestic Abuse incidents in Perth & Kinross is largely in line with
the average national rate per 10,000 of population.
Along with specialist departments, including the Divisional Domestic Abuse
Investigation Unit and National Domestic Abuse Task Force, we continue to work with
partner agencies to ensure safeguarding of victims and pursue every opportunity to
target perpetrators and prevent further harm.
This activity will link in with and support the Perth and Kinross
Community Plan 2017-2027 strategic priorities:
 Giving every child the best start in life
 Creating a safe and sustainable place for future
generations 
This also supports the delivery of Police Scotland’s strategic
outcome: 
 Threats to public safety and wellbeing are resolved by a
proactive and responsive police service
Page 64 of 250

Page 65

OFFICIAL 
30 
OFFICIAL
During Q2, the Domestic Abuse Task Force had 3 live MATAC investigations involving
Perth & Kinross perpetrators.
Significant court outcomes during Q2:
A 42 year old male appeared at Perth Sheriff Court having been found guilty of a
DASA offence committed against a previous partner and also several breaches of
bail conditions.  He was sentenced to 18 month’s imprisonment and given a 5 year
Non Harassment Order. 
Hate Crime
Processes remain in place across the Division to monitor and review all Hate crimes
and incidents to ensure these are being identified and recorded appropriately. 
85
38 19 28
103
51 24 28
0
50
100
150
Div Dundee Perth and Kinross Angus
Domestic Abuse - Recorded Crime
2021/22 2022/23
72.7 68.2
81.6
42.1
67.969.62 65.05 66.7
50.0
75.0
0.0
20.0
40.0
60.0
80.0
100.0
Scotland Div Dundee Perth and Kinross Angus
Domestic Abuse - Detection Rates
2021/22 2022/23
2.47
3.40
1.60
2.40
1.65
0.00
1.00
2.00
3.00
4.00
Div Dundee Perth and Kinross Angus
Domestic Abuse - Rate per 10,000 Population
2022/23 Scotland
Page 65 of 250

Page 66

OFFICIAL 
31 
OFFICIAL
A daily review is carried out of Hate crimes/incidents to assist with identifying
emerging trends and to allow appropriate interventions to take place. Relevant
partnership working allows for victims and communities to be signposted to support
agencies and for reassurance messages and hate material to be shared.  
The primary aims of this partnership activity is to increase hate awareness amongst
groups and communities, the re-training of existing local Third Party Reporting Centres
(TPRCs) continues as does identifying new premises and maintaining current Keep
Safe premises within Tayside.
Activity 
During the reporting period Third Party Reporting refresher training has been delivered
to existing centres and plans are in place to deliver Third Party Reporting/Hate Crime
café style sessions to local partners and 3rd sector support agencies at PKAVS, Perth.
The intention is to raise awareness of what Hate Crime is, Third Party Reporting
mechanisms and relevant support services. It will also be used as a networking
opportunity and a workshop is planned to find better ways of engaging with seldom
heard communities and those most likely to experience hate crimes/incidents. 
Officers from our Preventions Interventions and Partnerships (PIP) team met with PKAVS
to seek advice on how to build a better understand of hard to reach communities
into new community engagement report, following “Picture of a Pandemic”.
Work is also ongoing through Perth and Kinross Equalities Forum to better coordinate
initiatives and communications on identified calendar dates to maximise impact,
make best use of resources and reach as many people as possible. 
Police attended recent Pride events to help break down perceived barriers, engage
with the LGBTQ+ community and raise awareness regarding Hate Crime reporting.
Police attended Show Racism the Red Card Event at Perth City Chambers. The event
was organised by Saints in the Community with P7 Pupils from various local schools
also in attendance. 
The session was very well run and beneficial, with children fully engaging in the
seminar. At the end of the session, police participated in a panel discussion answering
questions on how to tackle racism and the effects it has on Society. 
PIP officers also delivered talks the community group at Perth Welfare Society who
support people from ethnic minority communities in Perth and Kinross. Talks focussed
on raising awareness around Hate Crime reporting and Third Party Reporting Centres
and reporting mechanisms. There was also a question and answer session with
members and members were asked how police could be more accessible to
them/provide a better service locally. The following feedback was received from the
event organiser “We had positive feedback from attendees, they felt it was good to
hear from the Police directly and liked the idea of Perth Welfare Society and Police
Scotland working in collaboration”.
Fresher's events throughout August and September 2022 at Perth College covering
drugs, internet safety, hate crime and general safety.
Page 66 of 250

Page 67

OFFICIAL 
32 
OFFICIAL
The occurrence rates for Hate Crime are marginally lower than LYTD (2 fewer crimes) 
Detection rates remain lower than LYTD, however as with other crime types a number
of crimes remained under active investigation at the end of the reporting period. 
Sexual Crime
Activity
There was an increase in sexual crimes recorded in Perth & Kinross in comparison to
2020/2021 levels (17 crimes), which is also above the 5 year average.  
The level of recorded crime for Rape and Attempted Rape is lower than 2020/2021
with 16 fewer crimes recorded, which is also below the 5 year average.
As per previous reports, many sexual offences which are reported have occurred
significantly out with the reporting period and are classed as non-recent (i.e. the
offence was committed more than twelve months before the crime was reported to
Police).
74
40
20 14
62
32 18 12
68.6
37
15.8 15.8
0
50
100
Div Dundee Perth and Kinross Angus
Racially Aggravated Harrassment/ Conduct - Recorded Crime
2021/22 2022/23 5 Year Ave
87.7 89.2 87.5 85.0 100.084.18 80.65 90.6
61.1 83.3
0.0
50.0
100.0
150.0
Scotland Div Dundee Perth and Kinross Angus
Racially Aggravated Harrassment/ Conduct - Detection Rates
2021/22 2022/23
1.49
2.10
1.20 1.001.40
0.00
2.00
4.00
Div Dundee Perth and Kinross Angus
Racially Aggravated Harrassment/ Conduct - Rate per 10,000
Population
2022/23 Scotland
Page 67 of 250

Page 68

OFFICIAL 
33 
OFFICIAL
Recent analysis shows 24% of all recorded sexual offences and 38% of rapes fall into
this category.
In a number of these cases, multiple crime reports are raised in respect of one report
from one victim, detailing multiple incidents over a period of time in cases where the
victim and perpetrator are known to one another.
All rape investigations are conducted by specially trained officers and are overseen
by an experienced Senior Investigating Officer (SIO) and are subject to regular reviews
to ensure that all available lines of enquiry are identified and progressed. 
Results
The detection rates for rape and sexual crime are significantly higher than 2020/2021,
while a number of more complex enquiries remain under active investigation by
specialist units including the Divisional Rape Investigation Unit and National Rape Task
Force. 
Challenges
It is positive that there is increased confidence in reporting non-recent sexual crime,
however this presents challenges as investigations are more protracted and evidence
which may provide corroboration may have been lost due to the passage of time.  As
previously reported, Tayside Division created a dedicated team to deal with non-
recent sexual offences and we continue to ensure that victims are offered the support
of partner agencies throughout and after the enquiry. 
626
281 187 158
655
235 204 216
625.8
285.2 164.8 175.8
0
500
1000
Div Dundee Perth and Kinross Angus
Group 2 - Recorded Crime
2021/22 2022/23 5 Year Ave
53.2 53.2 57.3 48.7 51.355.11 56.95 56.6 61.8 52.8
0.0
50.0
100.0
Scotland Div Dundee Perth and Kinross Angus
Group 2 - Detection Rates
2021/22 2022/23
Page 68 of 250

Page 69

OFFICIAL 
34 
OFFICIAL 
15.69 15.70 13.40
18.60
13.31
0.00
10.00
20.00
Div Dundee Perth and Kinross Angus
Group 2 - Rate Per 10,000 Population
2022/23 Scotland
110
41 46 23
114
37 30 47
126.4
60 36.6 29.8
0
100
200
Div Dundee Perth and Kinross Angus
Rape and Attempted Rape - Recorded Crime
2021/22 2022/23 5 Year Ave
54.8 57.3 80.5
41.3 47.852.4 53.5 67.6 80.0
25.5
0.0
50.0
100.0
Scotland Div Dundee Perth and Kinross Angus
Rape and Attempted Rape - Detection Rates
2021/22 2022/23
2.73 2.50 2.00
4.00
2.35
0.00
5.00
Div Dundee Perth and Kinross Angus
Rape and Attempted Rape - Rate Per 10,000 Population
2022/23 Scotland
Page 69 of 250

Page 70

OFFICIAL 
35 
OFFICIAL 
Possession of Drugs 
The pursuit of individuals involved in drug related serious and organised crime across
Perth and Kinross remains a priority. We are aware of the national issues associated
with County Lines and Cuckooing and take all available steps to reduce the harm this
presents to the most vulnerable people in our communities. This type of practice is
closely monitored through the Divisions Cuckooing Operations Group and our
Intelligence Unit. 
Our Partnerships, Interventions and Preventions team augment the good work carried
out by local officers and continue to work with key partners to support victims who are
being targeted and exploited. We take every possible opportunity to identify and
arrest those individuals involved in County Lines and Cuckooing behaviour. We
continue to apply our resilient response to any such report of these activities seeking
to drive these offenders out of our communities. 
The availability of controlled drugs within Perth and Kinross continues to act as a driver
for both crimes of violence and acquisitive crime. Many of these victims are individuals
embroiled in the chaotic lifestyles associated with drug addiction. There is little doubt
that such addiction leads to increased vulnerability resulting in the need for the
sustained support of local authority and third sector services. Welfare visits continue to
be carried out to ensure victims are identified, supported and referred to appropriate
services where possible.
Possession of drugs figures remain below levels recorded in previous years, however
are higher than figures recorded in Q1. The detection rate of 104% reflects backlogs
experienced at the Police Laboratory with results now being obtained which allow us
to detect offences recorded out with the reporting period.
A mix of Class A, B and C drugs continue to be recovered consistent with previous
reporting periods and with no new or emerging drug types being identified.
This activity will link in with and support the Perth and Kinross
Community Plan 2017-2027 strategic priorities:
 Creating a safe and sustainable place for future
generations
 Promoting a prosperous, inclusive and sustainable
economy
This also supports the delivery of Police Scotland’s strategic
outcome: 
 Threats to public safety and wellbeing are resolved by a
proactive and responsive police
Page 70 of 250

Page 71

OFFICIAL 
36 
OFFICIAL 
Supply of Drugs
We continue to prioritise our response and enforcement through the development of
quality intelligence and accurate analysis. This development and enforcement is
coordinated locally by our Divisional Serious and Organised Crime Team and involves
specialist support from colleagues in national Divisions including Organised Crime and
Counter Terrorism Units and Operational Support Division.
In July, the Divisional Serious and Organised Crime Team carried out a Drugs Search
Warrant and recovered a large Cannabis Cultivation in Blairingone.  Approximately
500 Cannabis plants were recovered and a male was reported to the Procurator
Fiscal.
In August, the Divisional Serious and Organised Crime Team carried out drugs search
warrants in relation to an ongoing operation and recovered 248g of herbal Cannabis,
12g of Cocaine, approx. £36500 and other paraphernalia indicative of drug dealing. 
Those involved were reported to the procurator fiscal.
Also in August a vehicle linked to the supply of Cocaine throughout the Tayside area
was stopped by police on the A90 near to Forteviot.  £155000 was recovered from the
vehicle.  The occupants were released pending further enquiry.
747
425
187 135
530
307
124 99
875.4
531.6
220 123.8
0
500
1000
Div Dundee Perth and Kinross Angus
Possession of Drugs - Recorded Crime
2021/22 2022/23 5 Year Ave
90.6 86.7 87.1 89.8 81.5100.4 97.4 93.5 104.0 101.0
0.0
50.0
100.0
150.0
Scotland Div Dundee Perth and Kinross Angus
Possession of Drugs - Detection Rates
2021/22 2022/23
12.70 20.60
8.20 8.5021.52
0.00
20.00
40.00
Div Dundee Perth and Kinross Angus
Possession of Drugs - Rate Per 10,000 Population
2022/23 Scotland
Page 71 of 250

Page 72

OFFICIAL 
37 
OFFICIAL
As well as targeting those involved in the supply of controlled drugs, we also look to
deliver support to individuals who are victimised by those involved in the supply of
drugs. The Non-Fatal Overdose Pathway continues to play an important role in this
collaborative approach.
There remains a cultural problem in respect of drug addiction within parts of Perth and
Kinross, which drives demand and provides a market for those criminals who would
seek to exploit vulnerable people. Enforcement activity is one part of the solution,
however the sustained focus of the Police and partners remains critical in tackling the
broader social impact of drugs within the area.
There has been a reduction in the number of Drug Supply offences recorded when
compared to LYTD (18 fewer crimes), a trend which is reflected throughout the
Division.
Detection rates have increased when compared to LYTD, however are currently
marginally lower than the Divisional and National Averages. 
181
83 63 35
134
70 45 19
158.6
85.6
49.8 23.2
0
100
200
Div Dundee Perth and Kinross Angus
Supply of Drugs - Recorded Crime
2021/22 2022/23 5 Year Ave
84.2 86.2 96.4 76.2 80.087.0 92.5 100.0 82.2 89.5
0.0
100.0
200.0
Scotland Div Dundee Perth and Kinross Angus
Supply of Drugs - Detection Rates
2021/22 2022/23
3.21
4.70
3.00
1.60
3.75
0.00
1.00
2.00
3.00
4.00
5.00
Div Dundee Perth and Kinross Angus
Supply of Drugs - Rate Per 10,000 Population
2022/23 Scotland
Page 72 of 250

Page 73

OFFICIAL 
38 
OFFICIAL
Proceeds of Crime
Civil Cash Seizure Referrals: £1,080.00 
Assets for Restraint: £6,886.68 
Page 73 of 250

Page 74

OFFICIAL 
39 
OFFICIAL 
CONTEST is the UK Government's Counter Terrorism Strategy. It was first developed by
the Home Office in early 2003. The aim of the strategy is "to reduce the risk to the UK
and its interests overseas from terrorism, so that people can go about their lives freely
and with confidence."  CONTEST is split into four work streams that are known within
the counter terrorism community as the 'four P's': Prevent, Pursue, Protect, and
Prepare. 
• Pursue: the investigation and disruption of terrorist attacks. 
• Prevent: work to stop people becoming terrorists or supporting terrorism or extremism. 
• Protect: improving our protective security to stop a terrorist attack. 
• Prepare: working to minimise the impact of an attack and to recover from it as quickly
as possible. 
At present the national threat level is currently at SUBSTANTIAL this means it is deemed
an attack is likely. 
Divisional Officers continue to support partners and organisations in various CONTEST
related matters including advice on security and protection of premises and the
mitigation of physical and cyber-attacks. 
A number of Community Officers are also trained to be local CONTEST officers
providing a capacity to promote delivery of the strategy throughout communities as
part of daily business. 
This activity will link in with and support the Perth and Kinross
Community Plan 2017-2027 strategic priority:
 Creating a safe and sustainable place for future
generations
This also supports the delivery of Police Scotland’s strategic
outcome: 
 Threats to public safety and wellbeing are resolved by a
proactive and responsive police service 
Page 74 of 250

Page 75

OFFICIAL 
40 
OFFICIAL 
Wildlife Crime is any act that is made illegal in Scotland under legislation with regard
to certain birds, animals and plants including their habitats, both on land and at sea.  
It includes the illegal disturbance, destruction, theft and sale of animals and plants
both in the countryside and urban areas, and includes the destruction of and
damage to protected habitats.
The overall number of Wildlife crimes recorded YTD has increased marginally when
compared to 2021/22 (3 additional crimes).  Analysis of the crimes recorded reveals
no particular pattern in relation to the type or location of offences committed.
All Wildlife crimes are reviewed by a dedicated Wildlife Crime Liaison Officer based
within CID who provides advice and guidance to investigating officers and acts as a
direct link to national assets within Specialist Crime Division and wider partnerships.
Responsibility for the investigation of Wildlife crime can lie with any operational officer
and a Wildlife Crime Toolkit has been created to ensure consistency of investigative
practice and this is further supplemented by a new online training package for
operational officers.
Detection rates for Wildlife crime are currently lower than LYTD, however a number of
these crimes remain under active investigation with some awaiting the result of
forensic examinations.
In July 2022 a 16 year old male was reported to the Children’s Reporter for a
contravention of the Wildlife and Countryside Act 1981 (Disturb nesting bird).  The
offence was committed in May 2022 in the Luncarty area and the accused was
identified following enquiries by local officers.
This activity will link in with and support the Perth and Kinross
Community Plan 2017-2027 strategic priority:
 Creating a safe and sustainable place for future
generations
This also supports the delivery of Police Scotland’s strategic
outcome: 
 The needs of local communities are addressed through
effective service delivery
Page 75 of 250

Page 76

OFFICIAL 
41 
OFFICIAL 
18
3
8 7
14
0
11
3
12.2
1.2
4.2
6.8
0
5
10
15
20
Div Dundee Perth and Kinross Angus
Wildlife Crimes- Recorded Crime
2021/22 2022/23 5 Year Ave
54.43 61.1
0
75 71.481.53
35.7
0
45.5
0
0
20
40
60
80
100
Scotland Div Dundee Perth and Kinross Angus
Wildlife Crimes - Detection Rates
2021/22 2022/23
0.34
0
0.7
0.3
0.29 0.29 0.29 0.29
0
0.2
0.4
0.6
0.8
Div Dundee Perth and Kinross Angus
Wildlife Crimes -
Rate Per 10,000 Population
2022/23 Scotland
Page 76 of 250

Page 77

OFFICIAL 
42 
OFFICIAL
Complaints about the Police 
Members of the public need to have confidence that should they wish to raise a
concern or make a complaint about the quality of policing service provided or the
actions of an individual, their concerns will be listened to and appropriate action
taken. 
Frontline Resolution (FLR) will be attempted for allegations which are non-serious, non-
criminal and non-complex in nature. This involves resolution by explanation, apology
or assurance. Where this cannot be achieved, a full enquiry in accordance with
statutory guidance will be undertaken. 
Should complainers remain dissatisfied with the handling of a complaint upon its
completion, they may contact the Police Investigations and Review Commissioner
(PIRC) to request an independent Complaint Handling Review. 
Complaints Received
Table: Complaints received for Tayside Division (Apr-Sept) 1
Category LYTD YTD % change from LYTD
Complaints Received - TOTAL 299 228 -23.7%
Allegations Received - TOTAL 525 369 -29.7%
Off Duty Allegations 1 1 0.0%
On Duty Allegations 363 238 -34.4%
Quality of Service Allegations 161 130 -19.3%
1 Data is correct as at 30/09/2022. 
Complaints in Tayside have decreased by 23.7% YTD compared to the LYTD. 
Page 77 of 250

Page 78

OFFICIAL 
43 
OFFICIAL
Appendix 
Rate 1 per 10,000 figures are based on the following population data:     
Reporting Period3         
2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Mid-year Population Estimate (Total Persons)2           
2014 2015 2016 2017 2018 2019        
FORCE / SCOTLAND 5 347 600 5 373 000 5 404 700 5 424 800 5 438 100 5 463 300         
Tayside 413 800 415 040 415 470 416 090 416 080 417 470 
Angus 116 740 116 900 116 520 116 280 116 040 116 200 
Dundee City 148 130 148 210 148 270 148 710 148 750 149 320 
Perth & Kinross 148 930 149 930 150 680 151 100 151 290 151 950 
2 - Mid-year population data based on extracts from National Records
for Scotland (http://www.nrscotland.gov.uk/), as at April 2016. 
3 - Due to when population data are published it is necessary to use earlier mid-year
estimates in some calculations.  As soon as more current population data are available,
the above table will be updated.
Page 78 of 250

Page 79

PERTH AND KINROSS COUNCIL 
Housing And Social Wellbeing Committee 
25 January 2023  
COMMUNITY PLANNING PARTNERSHIP UPDATE 
Report by Head of Cultural and Community Services 
(Report No. 23/8)  
1. PURPOSE 
1.1 This report provides an update on the work of the Community Planning
Partnership (CPP) since the previous report on 2 November 2022. 
2.     RECOMMENDATION
2.1  It is recommended that Committee homologates the Council’s response to
the Scottish Parliament Inquiry into Community Planning (Appendix A) and
notes the following CPP activity: 
• Ongoing support around Cost of Living
• Progress through the Local Employability Partnership
• Progress on the establishment of a Cash First Partnership for
Perth and Kinross
• Update on the 2022/23 Community Investment Fund 
3.  STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Update from CPP Board
• Section 5: Cash First Partnership
• Section 6: Conclusion
• Appendices 
4. UPDATE FROM CPP BOARD 
4.1 The CPP Board met on 18 November and focused on four main items of
business: 
i. Cost of Living – updates were provided by Perth and Kinross Council
and Social Security Scotland on the actions that were being taken at a
local and national level to support households through the Cost of
Living crisis. Key points from the Council included the establishment
of the Anti-Poverty Taskforce and the £420,000 financial support for
5
Page 79 of 250

Page 80

warm spaces, emergency food provision and the creation of warm
packs for individual households. The Local Outcomes Improvement
Plan contains specific commitments around additional anti-poverty
actions and this will be the focus of the first CPP Executive Officer
Group meeting of 2023. 
ii. Local Employability Partnership – the LEP has been established
through the Community Planning Partnership, with Perth College UHI
chairing. The initial focus of the LEP has been to bring together
employability support services closer together. As part of this, they
have appointed a co-ordinator, reviewed and mapped current service
provision and are tendering for external support to develop an
overarching Employability Strategy. 
iii. PKC Corporate Plan – CPP Board members received an update on
progress with the PKC Corporate Plan, with a presentation setting out
the proposed Council objectives and priorities for the period up to
2027. The priorities closely reflect the strategic objectives of the LOIP.
iv. Inquiry into Community Planning – in late 2022, the Scottish
Parliament Local Government and Communities Committee put out a
call for evidence on current Community Planning policy and
legislation, with a deadline of 13 January 2023. Due to this deadline,
the Committee Convenor approved a final draft response which was
submitted on 13 January. Committee is asked to homologate the
report, with any further changes or comments to be submitted to the
Parliament as the Council’s formal response. The PKC response is
provided as Appendix A to this report. 
5. CASH FIRST PARTNERSHIP 
5.1 CPP Board has approved a proposal to submit an application to pilot a Cash
First Partnership (CFP) in Perth and Kinross. CFPs bring services together in
order to move away from a model in which food banks are often the first or
sole point of referral, to a model which focuses on income maximisation.
Scottish Government have made funding available to support 10 pilot CFPs in
Scotland and a bid, led by the CPP, will be submitted once the deadline is
confirmed. In preparation for a bid, a CFP Working Group has been
established including a number of key partners. This Working Group is initially
focussing on three main areas: 
i. Agreeing a shared platform for all partners to use to provide digital
service access. This would allow clients to make appointments online
using one system, as opposed to using a combination of different in-
person and digital solutions. 
ii. Producing a map of support, which will be published online, allowing
clients to find their most local source of support and advice.
iii. Considering options for a shared referral management system, so that
all support services use the same process and systems, supporting a
more efficient customer journey  
Page 80 of 250

Page 81

6. COMMUNITY INVESTMENT FUND 2022/23 
6.1 The 2022/23 Community Investment Fund opened for applications w/c 19
September 2022 and closed on Friday 4 November. Ward Panels met in
November and December to consider the applications. A total of 111
applications were made, seeking £800,000 of funding, against an available
budget of £410,000. A full report will be taken to Finance and Resources
Committee on 1 February detailing how funding was awarded. 
7. CONCLUSION 
7.1 This is an update on Community Planning related activity in Perth and
Kinross, since the last update on 2 November, covering Cost of Living,
employability, the PKC Corporate Plan, Inquiry into Community Planning,
work to establish a Cash First Partnership and a summary of the 2022/23
Community Investment Fund. 
Author(s) 
Name   Designation  Contact Details 
Lee Haxton  Community Planning Team
Leader 
(01738) 475000
ComCommitteeReports@pkc.gov.uk     
Approved  
Name  Designation  Date 
Barbara Renton  Executive Director
(Communities)
16 January 2023   
Page 81 of 250

Page 82

ANNEX 
1.  IMPLICATIONS, ASSESSMENTS, CONSULTATION, AND
COMMUNICATION 
Strategic Implications  Yes / None 
Community Plan / Single Outcome Agreement   Yes 
Corporate Plan   Yes 
Resource Implications    
Financial   None 
Workforce  None 
Asset Management (land, property, IST)  None 
Assessments    
Equality Impact Assessment  None 
Strategic Environmental Assessment  None 
Sustainability (community, economic, environmental)  None 
Legal and Governance   None 
Risk  None 
Consultation   
Internal   None 
External   None 
Communication   
Communications Plan   None 
1.  Strategic Implications 
Community Plan/Single Outcome Agreement    
1.1  The Improvement Actions identified in the report may impact all of the
strategic objectives but are likely to be most relevant to: 
(ii) Developing educated, responsible and informed citizens 
(iii) Promoting a prosperous, inclusive, and sustainable economy 
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 The Improvement Actions identified in the report may impact all of the
strategic objectives but are likely to be most relevant to: 
(ii) Developing educated, responsible and informed citizens 
(iii) Promoting a prosperous, inclusive, and sustainable economy 
(v) Creating a safe and sustainable place for future generations 
Page 82 of 250

Page 83

2.  Resource Implications 
Financial    
2.1  Not applicable. 
Workforce 
2.2  Not applicable. 
Asset Management (land, property, IT) 
2.3  Not applicable. 
3.  Assessments 
Equality Impact Assessment    
3.1  Proposals that have been considered under the Corporate Equalities Impact
Assessment process (EqIA) are assessed as not relevant for EqIA. 
Strategic Environmental Assessment    
3.2  Proposals have been considered under the Act, and no further action is
required as it does not qualify as a PPS as defined by the Act and is therefore
exempt.    
Sustainability    
3.3  Not applicable. 
Legal and Governance 
3.4  Not applicable. 
Risk 
3.5  Not applicable. 
4.  Consultation 
Internal 
4.1  Staff in Communities Service have been consulted during the preparation of
this report. 
External    
4.2  Not applicable. 
Page 83 of 250

Page 84

5.  Communication 
5.1  Not applicable. 
2.  BACKGROUND PAPERS 
2.1 No additional documents have been relied on in preparing the report, other
than those committee reports already referenced within the main body of the
report. 
Page 84 of 250

Page 85

APPENDIX A 
COMMUNITY PLANNING INQUIRY: CALL FOR VIEWS QUESTIONS
1. What action has been taken at a local level to improve community participation
and collaboration between partners since the requirements of the 2015 Act
came into force? Can you provide examples of success?
In 2016, we established 5 (now 7) Local Action Partnerships (LAPs) to implement
local community planning in line with the requirements of the Community
Empowerment Act. LAPs bring together community and third/voluntary sector
representatives with local ward Councillors and local public services. Initial piloting of
Participatory Budgeting in Perth and Kinross, funded by Scottish Government, was a
major incentive for communities to get involved in the LAPs. The opportunity to
determine financial decisions locally and through participative democracy is an
important success factor for sustained community participation in local decision
making, which we have broadened through the Community Investment Fund (see
below).
All 7 LAPs are now chaired by a community representative, supported by a Lead
Officer from the CPP. Within the parameters of the Community Empowerment Act,
their key purpose is collaborative work to reduce stubborn inequalities in localities.
Priorities are set out in Local Action Plans linked to the wider area-wide priorities in
the Local Outcomes Improvement Plan. 
Since 2016, the LAPs have disbursed £550,000 in devolved Council funds to support
initiatives in Local Action Plans. LAPs were central to piloting Participatory Budgeting
in 2017/18, when £325,000 was dispersed to 250 projects, with over community
30,000 votes cast. During the COVID pandemic and lockdowns, LAPs oversaw
disbursal of £185,000 devolved community grants to 83 projects which directly
supported grassroots emergency support. Currently, the Council’s Community
Investment Fund (CIF) provides support to projects which tackle local inequality and
improve quality of life, and LAPs also play a key role in assessing and
recommending CIF grant applications. with many community representatives actively
involved in grant panels. The CIF has disbursed almost £2m funding to over 250
projects since 2017/18.
There are various examples of how the LAPs support grassroots initiatives across
Perth and Kinross in other ways. These include strengthened collaborative youth
work in Strathmore, and widening access to sport and leisure in Perth city centre. 
We are currently reviewing the impact to date and future direction of Local Action
Partnerships within our wider Transformation Programme, in light of our experience
since 2016 and wider changes to the national policy and delivery landscape. As with
all initiatives of this nature, the contribution of each LAP is different according to local
circumstances and needs and participation levels and impact has varied over time.
An alternative approach to local decision making and participation is currently being
piloted through a Local Committee in Kinross-shire. This has formal devolved
decision-making powers for core Council infrastructure services and resources and
brings local ward Councillors together with Community Councillors. Pilot evaluation
5
Page 85 of 250

Page 86

findings currently being finalised plus recommendations from our Transformation
Review of community empowerment and engagement will inform the future
design/shape of local community planning forums and delivery structures. 
2. What progress has your CPP made in tackling inequalities since the 2015 Act?
To what extent has your CPP adopted a preventative approach in seeking to
tackle inequalities? Can you provide examples of success? How are you
responding to the current cost-of-living crisis?
Examples of progress to date includes:
• Love Letham: a collaboration between the Council and the Wellbeing Economy
Alliance Scotland with a community-led approach to identifying co-produced
solutions to the key challenges facing families and young people in this locality. 
• Youth Services joint commissioning: as part of the wider CPP focus on
children and young people, the Gannochy Trust and Perth & Kinross
Council fund youth work providers on a collaborative, multi-year basis in 5
localities across Perth and Kinross. Delivery partners are supported to address
priority issues for local young people including social inclusion and emotional
wellbeing, as well as developing volunteering opportunities for young
people.  The partnership has also supported the wider development of youth
work practice across the area through mentoring and other support.  
• The evolution of adult learning to better support target groups through CP
collaborative working. The Adult Learning Partnership within the CPP is highly
focused on improving employability and digital skill.  This work was accelerated
during the Covid pandemic when CP partners developed an online Adult
Learning Hub offering both learning from home and in community learning
spaces. On average, 250 people per month are now using these services,
including refugees and asylum seekers.
• Digital Inclusion: CP partners, including Perth and Kinross Association for
Voluntary Services (PKAVS)/other 3rd sector partners plus the Health and
Social Care Partnership have strengthened joint working to support 10+
community facilities with broadband connectivity; providing devices to third
sector support groups; and investing in digital printing facilities in local libraries.
Research has also been commissioned to provide a baseline for levels of digital
participation and identity future actions and priorities.
• Capacity building for foodbanks and community larders became critical during
the pandemic. This work has continued due to the cost-of-living crisis, with the
focus on creating strong partnerships across food providers to address food
insecurity in our communities. 
Also in response to the cost-of-living crisis, the CPP Board approved a Statement of
Intent in September 2022 alongside the new Local Outcomes Improvement Plan 2022-
2032 with a focus on three immediate priorities:
• Bid to pilot a Cash First Partnership in Perth and Kinross, with a CP Working
Group involving PKAVS, Perth CAB, various Council services and a number
Page 86 of 250

Page 87

of third sector support groups committed to strengthening the ‘no wrong door’
approach for vulnerable clients 
• Support a Warm Spaces initiative – the Council has committed over £100,000
to date support 60 different community-led warm space initiatives and 24
public facilities are operating as warm space.
• Food security – the Council has committed an additional £200,000 of funding
to community-led emergency food provision and warm packs. Over 60 bids
have been agreed, providing support for food provision through foodbanks,
larders and other groups, as well as the creation of warm packs for individuals
and households. Warm packs are created and distributed by the organisations
themselves, but typically include items such as blankets, hand warmers and
other products which can help people stay warm in their own home. 
Examples of preventative approaches
• Social prescribing is delivered through the Council, NHS Tayside and the
Health and Social Care Partnership together with the local leisure Trust, with
6 social prescribers across the area, covering a number of GP practices.
• HomeFirst is our approach to combating preventing homelessness in Perth
and Kinross involving the Council, Scottish Government, Registered Social
Landlords and the Health and Social Care Partnership to develop a Common
Housing Register and Common Allocations Policy, ensuring that service users
are supported effectively and quickly to find a settled home. This has
achieved significant reductions in homeless presentations in Perth and
Kinross because people are effectively supported to sustain a tenancy
wherever possible.
3. What are the challenges faced by CPPs to the effective planning and delivery
of their outcomes? How has the Act changed how community planning
partners deliver their services?
In our experience the key factors which impact on quality of community engagement
and participation through the CPP are:
• Realism is needed about levels of community capacity and appetite to get
directly involved in planning and delivering local initiatives and services. We
saw very high levels of community mobilisation and engagement during the
pandemic, but this has declined in some localities since the pandemic eased
and as cost-of-living factors have impacted on people’s ability to volunteer
their time. 
• Socio-economic challenges faced by some communities can be highly
complex and generational. Co-produced solutions between communities and
public services require long-term trust relationships to be built (for example in
Letham) and a sustained leadership, resourcing and delivery focus by both
communities and public services. 
• Multiple initiatives from central and local government (for example
Participatory Budgeting, urban and town centre funding programmes) can be
challenging for communities to respond to and to sustain their input over time. 
• Understanding and using different local democratic tools:  representative
democracy (the role of elected Councillors and Community Councillors
Page 87 of 250

Page 88

participatory democracy (wider community voices and representatives
involved in local decisions) and deliberative democracy (e.g. Citizens Panels
to provide input to large complex policy questions). Understanding where and
how different democratic tools are best suited to different contexts and
purposes is important for building long-term trust with communities to co-
design local public service solutions.
The Act has provided greater clarity on the collective statutory duty which rests on
the CPP and on individual partners: this is helpful for the Council which, under the
Community Planning provisions of the 2003 Local Government (Scotland) Act, held
the lead coordination role. However, despite comprehensive public service reform
legislation and guidance which has emerged over the last decade, delivery
challenges remain for CPPs.  
CPPs operate in an increasingly complex policy and delivery landscape and within a
legislative framework which is broader than the 2015 Act alone. Key challenges
include:
• Performance frameworks and accountability lines for individual CP partners
remain complex despite previous Audit Scotland recommendations to Scottish
Ministers that these could be streamlined. Demand pressures and individual
accountabilities (for example acute care, adult and child protection) can
override longer-term CPP partnership priorities, exacerbated as public
finances continue to shrink.
• The inspection and scrutiny regimes for CPPs have not substantially evolved
to ensure evidence is gathered, assessed and triangulated to understand
local partnership working in the round. Direct observation of practice, face-to-
face engagement with key players at all levels in the CPP and gathering
community perspectives/insights are all key to understanding CPP impact and
efficacy. 
• The extent to which national bodies with a statutory role in Community
Planning engage in CP at local or regional level is highly variable and local
partners including Councils cannot compel them to participate. The role of SG
Place/Location Directors, which can also be variable, is important in this
context.
• Joint resourcing remains a significant challenge when all partners face
significant budget pressures and have different accountability lines for
delivering national and local targets. In Perth and Kinross, our current JR
focus is on rationalising/maximising use of the public estate. 
4. What role did your CPP have in the response to the Covid-19 pandemic? What
has the legacy of the pandemic been to approaches to community planning?
Key examples:
• Improvements to CLD provision, accelerated during the Covid pandemic.  In
Spring 2022 Education Scotland conducted a thematic review of the role played
by CLD in Perth and Kinross to support post-Covid recovery in communities
Page 88 of 250

Page 89

and how partnership practice was evolving in response. This highlighted
significant strengths in relation to supporting/growing volunteer capacity,
continued through the Volunteer Upskilling Fund which enables volunteers and
community groups to access a wide range of training opportunities.  
• The CPP response to the Two Sisters Covid outbreak in Coupar Angus in
August 2020. Two Sisters is a meat processing factory in a locality with
significant socio-economic challenges driven by a low wage economy and
other factors. It has a multi-national workforce (largely East European, 17
different languages), living in Perth and Kinross, Dundee and Angus. Within
two weeks of the first case, over 10% of the Coupar Angus population was
infected with Covid resulting in the factory closure and all workers had to self-
isolate. There were significant challenges around communications, food and
welfare needs and tensions within some parts of the local community. Joint
working between the Council, NHS Tayside, Perth and Kinross Association of
Voluntary Services (PKAVS) and partners from elsewhere in  Tayside resulted
in:
• Effective information and advice to all affected households in multiple
languages, supported by a strong communications plan which
transmitted key messages across social media. Interviews with
employees in different languages were recorded and shared online
encouraging people to follow the guidance and attend test centres.
• In line with SG directives food supplies and welfare checks were
completed on all affected households within 48 hours. 
This work was underpinned by our existing partnership relationships particularly with
community groups across the area including foodbanks/food larder initiatives and our
volunteer registration scheme, which gave volunteers accreditation and other
support to help them in their work. The CPP developed a GIS database of key
community groups across Perth and Kinross to match vulnerable people with the
closest/most appropriate support network in their area. At the height of the pandemic
this was vital.  
5. Does the existing guidance for Community Planning Partnerships need to
be updated?
See question 3 – current legislation and guidance is comprehensive enough.
However more consideration/understanding is needed in central government of the
underlying issues and barriers to effective community planning as demand pressures
grow and public finances shrink. Those involved in CP understand why these are
precisely the reasons which should drive integrated working through the CPP;
however day-to-day realities and pressures can make this difficult to sustain in
practice. 
Additional initiatives ranging from City Growth Deals, various town and rural
regeneration funding schemes, Period Dignity etc are hugely valuable and welcome
in their intent but add to the complexity of delivery requirements for CPs. 
Also as stated in q 3, consideration should be given to the future shape of inspection
and scrutiny. CP is currently audited by Audit Scotland through the Best Value
regime which reinforces the pre-2015 position which placed Councils in the lead CP
Page 89 of 250

Page 90

role. The role of Local Audit Networks in developing more holistic, practice-focused
inspection approaches is key. 
6. How does community planning align with other strategies and planning
requirements?
The CPP is actively engaged in delivering the Perth and Kinross Offer. The Offer is
re-calibrating the relationship between local communities and local public services
with a focus on co-producing solutions to local issues and delineating more clearly
where local communities can step into the lead to deliver local projects and
initiatives. This enables the Council and CP partners to target resources at more
vulnerable communities of geography and interest, and on longer-term preventative
work.
The Council’s new Corporate Plan (approved in December 2022) and the new Local
Outcomes Improvement Plan, (approved by the CPP and the Council in September
2022) are both central elements of a more streamlined approach to strategies and
plans in place across Perth and Kinross. The LOIP focuses only on ‘added value’
partnership and collaborative activity rather than ‘business as usual’ which is core work
for individual CP partners. The Council’s Corporate Plan and the LOIP share the same
overarching aim to make Perth and Kinross the best place in Scotland to live life well,
free from poverty and inequality. Other key area-wide strategies and plans including
the Policing Plan and Regional Transport Strategy are all ‘stress-tested’ through the
CPP Board.  
7. Do partners in your CPP contribute resources to enable the delivery of
outcomes?
Resource commitments by individual CP partners to deliver the LOIP are set out in
the LOIP Annual Action Plan. 
8. Whether inclusion as a planning partner has changed the way your
organisation works, spends its budget and makes decisions?
As a local authority, the Council has always played the key coordination role in
Community Planning and as stated LOIP priorities are closely aligned to the
Council’s Corporate Plan priorities. 
9. Does the statutory membership of Community Planning Partnerships need
revisiting?
Given the current focus on cost of living and climate change, we would suggest
Social Security Scotland and Scottish Water are given specific duties in relation to
Community Planning and their active participation.
A number of the bodies currently listed in Schedule 1 do not actively contribute in
sustained ways (see q.3), but the quality of input from partners currently stands or
falls on the quality of local relationships rather than a legislative requirement.
Ministerial direction in this regard would need to be enforceable on a practical level
as well as demonstrably transparent and fair.
Page 90 of 250

Page 91

The success of Community Planning at area-wide and locality level relies on
consistent input and joined-up thinking on the major issues which affect positive
outcomes for local people and communities. For example, economic wellbeing
(where Scottish Enterprise and Skills Development Scotland are key partners);
physical and mental health; affordable housing; public transport as a means of
accessing jobs, childcare, education and skills/vocational training. 
Page 91 of 250

Page 92

Page 92 of 250

Page 93

PERTH AND KINROSS COUNCIL 
Housing and Social Wellbeing Committee   
25 January 2023 
HOUSING REVENUE ACCOUNT (HRA) STRATEGIC FINANCIAL PLAN
INCORPORATING THE 5 YEAR CAPITAL INVESTMENT PROGRAMME AND RENT
STRATEGY TO 2027/28, RESERVES STRATEGY AND OTHER HOUSING
CHARGES FOR 2023/24 
Joint Report by Executive Director (Communities) and Head of Finance
(Report No. 23/9) 
1. PURPOSE 
1.1 The report seeks approval of the proposed Housing Revenue Account (HRA)
budget for five years from 2023/24 to 2027/28. To approve recommended
increases to rents for houses and other HRA property service charges, and an
appropriate level of reserves. It also seeks approval of the proposed budget for
the next five years of the Capital Investment Programme, totalling £89 million
from 2023/24 to 2027/28. The Committee is asked to note that the HRA 30-year
Business Plan has been updated to reflect and confirm the affordability of the
proposals. 
2. RECOMMENDATIONS 
2.1  It is recommended that the Housing & Social Wellbeing Committee:   
(i) approves the Housing Revenue Account Budget for 2023/24 and
provisional budgets for financial years 2024/25 to 2027/28 as set out in
Appendix 1. 
(ii)  approves the proposed Housing Revenue Account Capital Investment
Programme for 2023/24 to 2027/28 as set out in Appendix 4. 
(iii)  approves the Rent Strategy for 2023/24 and a provisional Rent
Strategy for the following 4 years to 2027/28 as stated in Section 6. 
(iv)      approves the rent increase of 2.2% in line with option 1, for the year
commencing 3 April 2023 for all Council houses. This would mean an
average weekly rent increase of £1.62 per week, giving an average
weekly rent of £75.23 per week based on 52 weeks. 
(v)  approves the rent increase of 2.2% for the year commencing 3 April
2023 for: 
• all lock-ups
• all garage sites
• dispersed tenancies owned by the HRA
• Greyfriars Hostel.
6
Page 93 of 250

Page 94

(vi)  approves the Housing Revenue Account Reserves Strategy proposed
in Section 10. 
(vii) approves that the final movement in the Housing Revenue Account in
2023/24 is transferred to a Covid-19 earmarked Reserve (HRA) as
proposed in Section 10.12. 
(viii)  approves the proposal to set Housing service charges from 3 April
2023 as stated in Section 13. 
(ix)  endorses and approves, where necessary, the revised level of all
housing related charges as detailed in Appendix 6. 
(x)      endorses the progress made to date in delivering and maintaining the
SHQS for improving and managing the housing stock as set out in
Section 7 and the related Business Cases. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues
• Section 5: Tenant Engagement
• Section 6: Housing Revenue Account
• Section 7: Capital Investment Programme
• Section 8: Increasing Council House Stock
• Section 9: Rent Strategy
• Section 10: Use of Balances/Reserve Strategy
• Section 11: Comparison with other Local Authorities and Registered Social
Landlords
• Section 12: Proposed Rents for other Services
• Section 13: Proposed Housing Services Charges
• Section 14: Conclusion
• Appendices 
4. BACKGROUND/MAIN ISSUES 
4.1 The Council owns and manages 7,923 properties. The Housing Revenue
Account (HRA) meets all operational expenditure of supporting tenancies,
building maintenance and capital financing charges associated with investment in
existing and new social rented housing stock. It also contributes to financing
major upgrades and improvements in the investment programme, through
revenue contributions to capital projects. 
4.2 The HRA receives income from rents (houses, garages, and other properties)
and interest on balances, which funds all relevant HRA expenditure. 
Page 94 of 250

Page 95

4.3 The HRA Business Plan and Capital Investment Programme form the basis of
proposals to ensure that the Council’s housing stock continues to comply with the
Scottish Housing Quality Standard (SHQS). 
4.4 The HRA Business Plan is updated each year to reflect the available budget,
tenants’ priorities, rent strategies and economic conditions to ensure it continues
to be affordable and sustainable. The HRA Business Plan has been updated to
reflect the proposals within this report. The HRA budget for 2023/24 (Appendix 1)
has been prepared in accordance with Housing Acts, Scottish Government
directives and regulatory requirements. 
4.5 A house condition survey was commissioned in January 2020 but was delayed
due to COVID-19. The survey has been completed and confirms that our overall
housing conditions are good with no major outstanding repair works required.
The report is being finalised and will inform plans to ensure all our existing stock
meets the climate change legislation and will be used to inform our retrofit
assessments. The report will now be used to inform the Local Housing Strategy,
which will be reported to Committee in March 2023.  
4.6 Other factors influencing the Capital Programme and rent setting proposals
include tenants’ incomes and rent affordability, increasing costs of materials and
services, the climate change agenda and Housing to 2040. The impacts of the
COVID-19 pandemic on our tenants and the HRA remain key factors that have
influenced the rent setting proposals. ‘ 
4.7 An Elected Members briefing session on the overview of the HRA rent setting
process and potential rent options for 2023/24 was held on 29 November 2022.
This gave all members the opportunity to ask questions on the process and
proposals that tenants were voting on. This session was recorded, and all
members were provided with further information on the questions raised at the
session. 
5. TENANT ENGAGEMENT 
Approach 
5.1 The Scottish Social Housing Charter sets the standards and outcomes that all
social landlords should aim to achieve when performing their housing activities.
Outcomes 14 and 15 are the outcomes primarily linked to the rent setting process
and the financial aspect/delivery of the HRA. These outcomes require social
landlords to set rents and service charges in consultation with their tenants and
other customers so that: 
• a balance is struck between the level of services provided, the cost of the
services and how far current and prospective tenants and other customers
can afford them. 
• tenants get clear information on how rent and other money is spent, including
any details of individual items of expenditure above thresholds agreed
between landlords and tenants. 
Page 95 of 250

Page 96

5.2 These outcomes reflect local authorities’ legal duties, under section 25(4) of the
Housing (Scotland) Act 2001, to consult tenants affected by the proposed
increases and to have regard to their views, including affordability and decisions
about how rental income is spent. Landlords must also decide whether to publish
information on expenditure, as well as the format and level of detail to be included
within this information.  
5.3 Perth and Kinross Council must engage in discussions with tenants about rents
and any decisions made, in relation to rent levels, should reflect tenants’ views.
The proposals contained within this report reflect tenants’ views. In approving this
report, members of the committee must demonstrate that they have fully
considered these views.  
5.4 Our approach to involving tenants in the rent setting process was developed by
the Strategic Tenant Engagement in the Annual Rent Setting (STEARS) tenant
working group. This approach is regularly reviewed with tenants and follows the
recommendations from the Scottish Housing Regulator which include: 
• providing tenants with 3 rent increase options 
• demonstrating affordability levels 
• consulting with current and prospective tenants. 
Rent Affordability Model 
5.5 Our affordability model was developed with staff and tenants and is updated
annually to assess the affordability of our rent setting proposals. 
5.6 The outcome from this year’s affordability assessment demonstrated that Perth
and Kinross Council’s rents were, on average, 9% (£7 per week) lower than
neighbouring local authorities and 23% (£18 per week) lower than local Housing
Associations. These figures are based on our proposed rent levels for 2023/24,
compared against an assumed average national increase of 2.5% for other local
authorities and Housing Associations. 
5.7 The affordability model demonstrated that 87% of our residents could afford our
proposed rents based on their income alone, without taking into account any
housing benefit they receive. To support those tenants who are struggling
financially or have difficulty meeting their rental obligations, a range of support
measures are in place including: - 
• financial assistance through the Tenancy Sustainment Fund
• financial support through locality team Think Yes budgets
• a team of Support Officers that can provide tailored advice and support
• assistance with accessing devices, data and getting online through our digital
Inclusion Project
• dedicated Welfare Rights support to offer specialist advice and assistance
• specialist money and debt advice service through CAB
• advice and support through our bespoke service from our SLA with SCARF
who provide free and impartial energy efficiency advice to Council tenants. 
Page 96 of 250

Page 97

5.8 We also recognise the significant challenge faced by all services and
communities in tackling and mitigating the impact of child poverty. The rent
affordability model is also used to inform work within the Child Poverty Action
Plan and plays a key contribution in mitigating and addressing child poverty in the
area. 
Rent Freeze Announcement 
5.9 The Scottish Government published the Programme for Government 2022 to
2023 on 6 September 2022. An element of this included an announcement
regarding an immediate rent freeze impacting on all private and social landlords: 
“As part of this we intend to introduce emergency legislation to protect tenants by
freezing rents and imposing a moratorium on evictions until at least 31 March
2023. We also intend to act to prevent immediate rent increases.” 
5.10 The Act is due to end on 31 March 2023 and the Scottish Government has
indicated that they intend to expire the social rented sector rent cap provisions
from March 2023. 
Statements of Intent have been published by COSLA, confirming local authorities’
commitment to keeping rent increases from April 2023 to an average of no more
than £5 per week. The agreement to set out average figures, rather than set a
fixed cap, allows flexibility for landlords to respond to their consultation with their
tenants. 
Tenant Engagement 
5.11 This year, we were able to return to the normal consultation process, with the
summer conference being held digitally and face to face, so that tenants had the
choice in how they participated. 
5.12 In April 2022, all Council tenants received a questionnaire asking for their views
and priorities in relation to rent setting, and how additional rent money should be
spent. 
5.13 A total of 595 (8%) of tenants responded, an increase of 218 responses from last
year, highlighting their priorities as follows: 
Priority High  Medium  Low 
Improving our Repairs Service 54% 34% 5%
Improving the Quality of your Home 59% 28% 6%
Improving your neighbourhood as a place to live 46% 31% 15%
Information for Tenants and Participation 25% 39% 23% 
5.14 At the Summer Conference, tenants were asked additional questions to gain
more detailed information on these priorities. The questions and results are
detailed at Appendix 2. 
Page 97 of 250

Page 98

5.15 An in-person and online Tenant Conference was held on 27 October 2022, which
gave tenants the opportunity to discuss this year’s approach and proposals. A
question and answer session was held at the forum, providing tenants with the
opportunity to ask questions on the proposals presented to them. 
5.16 Information was then sent to all tenants providing details of the 3 proposed rent
increase options and the impact and affordability of each of these. 
5.17 The options were: 
• 2.2% rent increase 
• 2.9% rent increase 
• 3.2% rent increase 
5.18 Tenants were provided with information and an explanation of each option, the
services and capital improvements that could be delivered, and the potential
impacts on service delivery (both positive and negative) of each. 
Covid Impacts and associated Budget Pressures 
5.19 The COVID-19 pandemic has had, and will continue to have, a profound and
wide-reaching impact throughout Scotland. Touching all aspects of society,
economy, educational outcomes, and our personal lives, the social housing
sector is no exception to this. 
5.20 At a national level, the housing sector has played a critical role in supporting
many vulnerable households, maintaining the delivery of homeless and sheltered
housing services, undertaking welfare checks and continuing to undertake gas
safety checks and emergency repairs. Issues and risks for the sector have
emerged, and will continue to do so, around homelessness, financial hardship
and rent arrears, access to housing and the ability of the sector to re-mobilise its
capital and new build projects. 
5.21 Irrespective of any additional new pressures or financial impacts of Covid, the
HRA still has cost pressures as a result of fixed costs. Examples of these cost
pressures are: - 
• staff costs
• adjustment to Bad & Doubtful debt provision
• loan charges 
5.22 These fixed costs are routinely reviewed as part of the budget setting process. 
Use of Reserves 
5.23 We are fully aware of the current financial issues our tenants are facing as a
result of the significant rise in the cost of living, partly due to inflationary and high
energy costs. Therefore, we have looked at ways we can reduce any further
financial pressure on our tenants. 
Page 98 of 250

Page 99

5.24 Our proposals are to utilise some of the Covid reserves to defer a number of
pressures until 2024/25. This will reduce the amount of funding required from a
rent increase, therefore reducing the impact on our tenants. We are proposing to
defer pressures amounting to £260,000. 
5.25 By using reserves, we can keep our rent increase requirements at the current
rent strategy of 2.2%. The deferred pressures would then form part of the
following year’s budget setting process. 
5.26 All options that have been presented to tenants are affordable and do not change
our current assumptions within the HRA Business Plan, including any future
investment. 
5.27 This will enable the Council to continue to meet our obligations to our tenants as
a landlord and maintain our current high levels of performance as a Housing
Service, whilst ensuring our Service remains sustainable and affordable. 
Rent Options 
5.28 The options that tenants were asked to consider are as follows: - 
Under all three options tenants will see new and increased investment in: 
• covering increasing costs of buying stock for repairs and improvements -
£281,000 – we have experienced increased costs and supply shortages for
building materials during the current year and anticipate that these will
continue to increase over the next 5 years
• service and maintenance - costs to operate and maintain emergency lighting
to communal areas across our stock - £204,000
• increased utility costs - £150,000
• contract price increases - £139,000
• fire sprinkler systems - £12,000
• continued funding for Digital, Financial & Social Inclusion - £150,000 
5.29 Some of our pressures within the proposals are in relation to Scottish
Government priorities such as: 
• Electrical Inspection Condition Reports for each property - £100,000 As a
landlord, we have a legal requirement to ensure that all tenants homes have
an Electrical Inspection Condition Report (EICR). This report confirms that
their home fully meets the required electrical standards. We must test all of
our 7,923 properties every 5 years which means this programme of work will
involve additional costs to the HRA. 
Page 99 of 250

Page 100

• Additional capacity to enable us to progress essential work to meet
climate change targets - £44,000 We have to ensure all of our housing stock
meets new climate change targets, and that carbon emissions from our
tenants’ homes are reduced whilst making sure they remain affordable to
heat. A detailed plan to take forward this necessary work is currently being
drawn up. This is a significant and complex area of activity that we have a
legal duty to carry out in coming years, and we must make sure that we have
the staffing skills and capacity to deliver on this. 
Option 1 - rent increase of 2.2% 
• Fixed cost increases
• Increased cost of materials - £281,000
• Increased costs for the service and maintenance of emergency lighting -
£204,000
• Increased utility costs - £150,000
• Contract price increases - £139,000
• Electrical Inspection Condition Reports - £100,000
• Additional staff to help us achieve a net-zero carbon emissions housing
stock - £44,000
• Fire Sprinkler Systems - £12,000
• Continued funding for Digital, Financial & Social Inclusion
• Buy Back Funding of £15million over 5 years to buy back 30 ex-Council
properties per year 
Option 2 - rent increase of 2.9% 
• Fixed cost increases
• Pressures as per option 1
• Buy Back Funding of £20million over 5 years to buy back 40 ex-Council
properties per year
• Additional pressures included for
o Planned Maintenance - £150,000
o Enhanced measures to tackle Anti-Social Behaviour (additional to
the pressure approved last year) - £40,000 
Option 3 - rent increase of 3.2% 
• Fixed cost increases
• Pressures as per option 1
• Buy Back Funding of £25million over 5 years to buy back 50 ex-Council
properties per year
• Additional pressures included for
o Planned Maintenance - £200,000
o Enhanced measures to tackle Anti-Social Behaviour (additional to
the pressure approved last year) - £80,000 
Page 100 of 250

Page 101

5.30 In November 2022, all 7,923 tenants received a survey providing rent setting
information and were asked to indicate their preferred option. This information
and survey were also promoted through the tenants’ On the House magazine,
online Consultation hub, Twitter, Facebook, and text messages. To increase the
level of responses and encourage as many tenants as possible to have their say,
staff across the service also undertook phone surveys and carried out drop-in-
sessions at local venues. 
5.31 To increase our reach to tenants further, we commissioned the Knowledge
Partnership hub to contact 1,500 tenants directly over the telephone to complete
the survey. 
5.32 From the above methods, our consultation process has ensured genuine
opportunities for all tenants to receive detailed information on each option, on
service delivery and to express their preferred level of rent increase for the
forthcoming year. 
A total of 2,625 tenants (33%) responded with the outcome as follows: 
• Option 1 - 51%
• Option 2 - 33%
• Option 3 - 16% 
The total number of responses this year was 2,625 (33%), this compares to 2,177
(28%) last year, representing an increase of 20.5%. 
Recommended Option 
5.33 Based on tenant feedback and a clear preference by tenants, this report
recommends that committee approves option 1 to increase rents by 2.2%. The
detail contained within the following sections of this report relate to option 1 as
detailed in section 5.29. 
6. HOUSING REVENUE ACCOUNT 
6.1 A budget for the HRA (as shown in Appendix 1) is balanced each financial year to
ensure the operating costs are met from the yearly rental income. The budget
includes an amount for Prudential Borrowing to meet the revenue cost of the
capital investment programme. Since the Standard Delivery Plan (SDP)
commenced in 2004, £148 million has been borrowed. This included the first
major works necessary to meet the SHQS, namely, the installation of new
kitchens and bathrooms. 
Page 101 of 250

Page 102

6.2 The additional cost pressures (as shown in Appendix 3) which the HRA must
contain within the next 5 financial years relate to the main areas described below: 
• the budget allows for a 3% pay increase for Single Status and Trades staff for
2023/24, based on the assumptions contained in the Medium-Term Financial
Plan approved by Council on 28 September 2022 (Report No. 22/249 refers),
plus the cost of incremental progression. 
• the increased costs relating to the agreed 2022/23 pay award.
• an adjustment to the bad and doubtful debt provision to take account of the
potential increased risk to the Council as a result of increased rent arrears
• ensuring that we can meet our climate change targets by reducing the carbon
footprint of our homes, whilst making sure they remain affordable to heat.
• our legal requirement to ensure that all of our tenants’ homes have an
Electrical Inspection Condition report (EICR).
• increased costs and supply shortages for building materials. We anticipate
that current shortages and price increases will continue into next year. 
6.3 In addition, a range of efficiency savings will be delivered, to minimise the impact
on future rents and borrowing requirements. These savings are summarised
below: 
• an increase in the staff slippage target to 4% - £100,000
• general efficiencies - £150,000 
6.4 The full detail of the pressures and savings are detailed in Appendix 3. 
7. CAPITAL INVESTMENT PROGRAMME 
7.1 Good progress has again been made with the capital improvements programme
during 2022. 
7.2 From 2021, a revised definition of the SHQS was introduced to reflect the new
Energy Efficiency Standard for Social Housing (EESSH). This is a much higher
standard to achieve than the previous standard. This change relates to increasing
the energy efficiency of the property. However, changes to the SHQS also
include the introduction of new indicators such as the installation of carbon
monoxide /interlinked smoke detector systems and the completion of a 5-year
Electrical Inspection Certificate Report for each property. 
7.3 Given the changes to the standard and the inclusion of new indicators, our SHQS
pass rate reduced significantly from 80.59% in 2020/21 to 46.83% in 2021/22.
Every local authority will be in the same position. The reason for the reduction in
the pass rate was due to difficulties in implementing the new standards during the
covid period. The new standard often required access to our tenant’s home which
was difficult due to some covid restrictions and tenants not providing access. We
also experienced significant delays with various capital programmes due to
issues with obtaining materials, procurement and shortages with labour,
particularly with electricians. 
Page 102 of 250

Page 103

7.4 Despite the above challenges, significant progress has been made this year with
the installation of interlinked smoke detector systems and EICRs. We currently
have only 1.03% of our stock requiring smoke detector installations and our EICR
completion rate is 90% and we are on track to achieve 100% compliance by 31
March 2023. The achievement of this will significantly improve our SHQS pass
rate this financial year. The Service will continue to demonstrate its excellent
track record in delivering improvements to meet the standards. 
7.5 The planned investment programme of £89 million for the 5-year period from April
2023 to March 2028 is summarised in Appendix 4. A number of community
benefits will arise from this level of investment, as well as the improvements to
our Council stock. The proposed Capital Investment Programme must comply
with SHQS over the next 5 years and amounts to £41 million, as summarised
below: 
• SHQS future developments - £27.3 million
• kitchens and bathrooms - £3.9 million
• rewiring/infrastructure/property refurbishment - £2.7 million
• multi-storey flats* - £2.0 million
• external fabric works - £1.8 million
• energy efficiency works - £1.5 million
• structural works - £1.2 million
• environmental improvements - £0.3 million
• sound insulation - £0.3 million
*Work on the 6 multi storey blocks includes all the types of improvement work listed in 7.5 
7.6 A review of the capital programme will be informed by the stock condition survey
and our retro fit assessments. This will identify future investment requirements, to
ensure our stock meets required quality and climate change standards as well as
the current and future needs of our tenants. The review will be concluded on
completion of the survey and the SHQS future developments budget of £27.3
million will be allocated appropriately. 
7.7 Relevant business cases have been produced for the capital programmes, where
appropriate. These will be made available online on the Councillors’ CHIP EDMS
site. 
7.8 The capital programme in Appendix 4 details the proposals for the following non
SHQS elements: 
• council house new build programme
• purchasing houses through the open market
• major adaptations to properties for people with particular support
requirements
• redevelopment and regeneration of St Catherine’s Square
• investment in Sheltered Housing complexes 
• adaptations to shops & offices
• mortgage to rent – under certain circumstances, where owner/occupiers have
difficulty in meeting mortgage payments, the Government can arrange for the
Page 103 of 250

Page 104

Council to buy the property and rent it back to the same individual as a tenant
to avoid homelessness
• replacement of lifts to ensure fire safety regulations in multi-storey
accommodation is met
• information and systems technology will be required to support new ways of
working e.g., PCs, mobile technology, servers etc. 
8. INCREASING COUNCIL HOUSE STOCK 
8.1 The Council has been continuing to increase its housing stock in three key ways: 
• new build programme
• buyback scheme
• conversion of existing HRA commercial properties. 
8.2 By the end of March 2023, it is estimated that 517 Council houses will have been
built since 2011, 290 former council houses purchased, and 12 properties
converted into flats for social rent. An update is provided on each of these below. 
Building new houses for social rent 
8.3  The aim of the Council’s new build housing programme is to provide high quality
affordable housing to meet housing need within the area, using grant funding
provided by the Scottish Government. Between 2011 and 2023, the Council will
have built 517 new builds. 
8.4 The table below summarises recent completions and current plans for the
forthcoming year. 
Project No of Units Year Completed
Newburgh Road, Abernethy  10 & 6 Shared
Equity
2022/23 
Fairfield, Perth 18 2022/23
Lynedoch Road, Methven 24 2023/24 
8.5 The size, type, location, and funding of the new build programme is determined
through the Strategic Housing Investment Plan, which was approved by the
Housing and Social Wellbeing Committee on 2 November 2022 (Report No.
22/262 refers). 
8.6 The Scottish Government recently announced an increase in the grant funding
per unit available to Local Authorities. This increased funding will vary by
development and will offset the increased costs of construction and enable the
HRA to continue to build social housing over the next 5 years. The Capital
Investment Programme assumes the Council house building programme will
continue to receive the same level of financial funding per house from the
Scottish Government. It also assumes the continued use of the Council’s
Earmarked Reserve for Affordable Housing. 
Page 104 of 250

Page 105

8.7 The Capital Investment Programme, detailed in Appendix 4, incorporates the
existing committed, and an indicative future, new build programme, with the
funding assumptions as presented in section 8.6.  Work is currently underway to
identify future sites for new builds. These will be reported to Committee once
confirmation is received that sites are viable projects. 
Purchasing former Council houses (buybacks) 
8.8 The Capital Investment Programme also includes funding for increasing Council
house stock by purchasing houses through the open market. It is anticipated that
by 31 March 2023, 290 houses will have been purchased at a cost of
approximately £34 million (including upgrading to SHQS). As a result of the
purchase of these properties, an additional 260 moves have been facilitated
through the resulting vacancy chains, supporting a total of 550 households into
more suitable accommodation. 
8.9 The capital investment programme has £15 million of funding allocated for buy-
backs over the next 5 years, with the potential to allocate additional money to this
from the overall budget for increasing our Council stock. This funding will be
accelerated as and when required, as properties become available to purchase. 
8.10 The Council has been successful in obtaining funding, in addition to the Housing
Allocation Grant from the Scottish Government, for the period 2013/14 to 2022/23
of £9.0 million. This additional funding has allowed the purchase of approximately
75 properties over and above the existing budget within the Capital Investment
Programme. 
9. RENT STRATEGY 
9.1 When setting the 2022/23 budget, the Housing and Communities Committee
approved a 3.0% rent increase for 2022/23 and a four-year rent strategy for
2023/24 to 2026/27 at an indicative rate of 2.2% (Report No. 22/15 refers). 
9.2 This provided a baseline level for tenants. It also allowed the Council to highlight
the potential future rent increase required to deliver the capital investment
programme and running costs of the HRA. 
9.3 In order to meet the tenant’s priorities gathered through the extensive
consultation, Scottish Government requirements and legislation in relation to
climate change and EICRs and to meet the fixed costs borne by the HRA, a 2.2%
rent increase (option 1) will be required for 2023/24. The proposed increase of
2.2% reflects the views of our tenants as noted in section 5.32 whilst maintaining
the financial health of the HRA Business Plan. 
9.4 The proposed rent strategy for the four-year period from 2024/25 to 2027/28 will
be set at an indicative rate of 2.2%. The actual agreed level will be dependent on
the outcomes of tenant feedback and the wider HRA rent setting process. 
9.5 This strategy was agreed with tenants, with the aim to provide a guide on
potential future rental increases. However, the actual increase is based on future
Page 105 of 250

Page 106

pressures and as a result of consultation with tenants on their spending priorities
for future years, which change year on year. 
9.6 The rent strategy as detailed above allows the HRA to: 
• set rents at reasonable levels over the period, maintaining Perth and Kinross
Council rents lower than the Scottish average
• demonstrate affordable rents for our tenants
• finance the cost of the future investment programmes to continue to improve
our housing stock
• provide headroom to allow for a commitment of 80 new houses each year
• increase the Council house stock by purchasing houses through the open
market
• finance the revenue borrowing cost of previous capital programme investment
to meet the SHQS and provide a new build programme (517 houses to date)
• continue to resource Locality Teams in managing tenancies, foster tenant
participation and work with partner colleagues in the community to create safe
and vibrant neighbourhoods
• enable a Reserves Strategy to provide uncommitted reserves of £1million. 
10. USE OF BALANCES/RESERVES STRATEGY
10.1 When reviewing their medium-term financial plans and preparing annual budgets,
local authorities should consider the establishment and maintenance of reserves.
These can be held for three main purposes to: 
• provide working balances to cushion the impact of uneven cash flows and
avoid unnecessary borrowing
• cushion the impact of unexpected events or emergencies
• build up funds, often referred to as earmarked reserves, to meet known or
predicted requirements. 
10.2 Money held in the general reserve is, therefore, not being directly used to deliver
the Housing Business Plan but is set aside for the purposes outlined in section 1. 
10.3 The financial risks to which the HRA could potentially be exposed include the
possibility of: 
• additional repairs due to severe weather events and other emergencies, such
as the Covid-19 pandemic
• the current economic climate 
• increasing rent arrears
• new legislation such as climate change and other statutory guidance
• the economic conditions, which could also impact on commercial lets,
resulting in lower rent levels or properties remaining void for longer periods. 
10.4 In view of the potential risks facing the HRA and, in accordance with guidance set
out in the CIPFA Local Authority Advisory Panel Bulletin (LAAP) 99 (published in
Page 106 of 250

Page 107

July 2014), the Head of Finance, therefore, recommends retaining an
uncommitted reserve on the Housing Revenue Account of between 2% and 4%
of gross expenditure – approximately £675,100 to £1,350,200. This will be
reviewed in future years and amended as required. 
10.5 At the Housing and Communities Committee of 24 January 2022, members
agreed that the HRA should maintain an uncommitted general reserve balance of
£1,000,000 (Report No. 22/15 refers). After reviewing the 30-year business plan,
it is felt prudent that the balance should continue to be maintained at the present
level. The business plan assumes that a balance of £1,000,000 will be
maintained for the next 5 years. 
10.6 At this time, it is not anticipated that there will be any requirement to utilise the
reserve in 2022/23 and consequently the balance will remain at £1,000,000. 
10.7 On 10 March 2021, Council approved that the final movement on the Housing
Revenue Account is transferred to an earmarked Covid-19 Reserve (HRA)
(Report No. 21/33 refers). 
10.8 The final movement on the HRA for 2020/21 was £2.006 million and the
proposals to utilise £1.558 million from this reserve was approved by SP&R in
September 2021 (Report No. 21/146 refers). 
10.9 The actual use of reserves during financial year 2021/22 was £608,000, which
reduced the Covid-19 Reserve (HRA) to £1.398 million. 
10.10 At the Housing and Communities Committee of 24 January 2022, members
agreed that the final movement on the Housing Revenue Account was
transferred into the Covid-19 Reserve (HRA) (Report No. 22/15 refers). 
10.11 The final movement on the Housing Revenue Account was £0.885 million, which
increased the Covid-19 Reserve (HRA) to £2.283 million. Proposals to utilise
£0.950 million from this reserve was approved by the Finance & Resources
Committee in September 2022 (Report No. 22/208 refers). 
10.12 On 30 November 2022, the Council were advised of a projected underspend of
£172,000 on the Housing Revenue Account which would see an increase in the
contribution to Capital from Current Revenue (CFCR) budget with a
corresponding reduction in borrowing (Report No. 22/294 refers). 
10.13 The latest monitoring position that will be presented to Council in February will
set out a further positive movement from the previously reported position of
approximately £120,000, increasing the projected underspend to £292,000. 
10.14 Committee is asked to approve that the final movement on the Housing Revenue
Account is transferred to the earmarked Covid-19 Reserve (HRA).  
Page 107 of 250

Page 108

11. COMPARISON WITH OTHER LOCAL AUTHORITIES AND REGISTERED
SOCIAL LANDLORDS 
11.1 Appendix 5 shows the Council house rents in Perth and Kinross compared to
other councils in Scotland. Perth and Kinross Council currently has the 6th lowest
rent in Scotland, at £5.93 below the Scottish average. 
11.2 This year, the comparison has been based on all other local authorities
increasing their rents by the same percentage as they did last year. 
11.3 Using these assumptions, Perth and Kinross would have an average rental figure
of £75.23 compared to the projected Scottish average of £80.41 for 2023/24. This
would mean Perth and Kinross Council would have the 7th lowest rent in
Scotland, £5.18 lower than the projected Scottish average. 
11.4 The level of rent increases for 2022/23 across local authorities in Scotland
ranged from 0% to 3.10%, with the Scottish average being 1.60%. 
11.5 Table 1 below details 2021/22 average rent levels for the main Registered Social
Landlords (RSLs) within Perth and Kinross. 
Registered
Social Landlord
2021/22
Bedroom Size/Weekly Rent (£)
Bedsit 1 2 3 4+      
PKC 49.29 66.70 72.40 81.04 87.22
Caledonia  80.48 88.19 85.01 94.57 105.62
Hillcrest HA 52.24 79.01 91.37 101.47 109.46
Kingdom HA 66.30 77.55 86.07 96.74 100.26       
Table 1: Average Rents 2021/22 (based on 52 weeks)  
Source: Scottish Housing Regulator 2022/23 Landlord Reports 
11.6 During last year, we were involved in a benchmarking exercise to compare the
financial health of HRA Business Plans across local authorities in Scotland. This
exercise evidenced that our business plan is well managed and in a good
position to meet current and future demands and service requirements. 
12. PROPOSED RENTS FOR OTHER SERVICES 
12.1 It is recommended that a range of non-commercial rents, excluding the HRA
rents for housing stock (detailed in section 9), are amended as detailed below
from 3 April 2023. The proposals ensure the Council continues to demonstrate
that it has set rents which reflect the characteristics of individual dwellings and
services provided. The different types of properties are detailed separately below: 
Rental charges for Greyfriars House
12.2 It is proposed to have a 2.2% rent increase for Greyfriars House to reflect the
same rental strategy for mainstream rents. 
Page 108 of 250

Page 109

Rental charges for dispersed temporary accommodation
12.3 It is proposed to have a 2.2% increase on rental charges for properties owned by
the HRA but allocated as temporary accommodation for homeless people to
reflect the rental strategy for mainstream rents. 
Lock-ups
12.4 It is proposed to have a 2.2% rent increase for lock-ups to reflect the rental
strategy for house rents to reflect the continued investment in repairs and
maintenance and planned maintenances. 
Garage Sites
12.5 It is proposed to have a 2.2% rent increase for garage sites to reflect the rental
strategy for house rents to reflect the continued investment in repairs and
maintenance and planned maintenances. 
Commercial rents
12.6 Rents from commercial properties are negotiated by Estates colleagues on a
property-by-property basis. These contracts include agreed levels of fees and are
not within the scope of this report. 
13. PROPOSED HOUSING SERVICE CHARGES 
13.1 Local Authority Housing Services separate service charges from housing rents, to
ensure that charges for services, such as caretaking, are fair and transparent.
Service charges usually reflect additional services which may not be provided to
every tenant, or which may be connected with communal facilities rather than
directly to the occupation of a dwelling. In addition, the HRA charges owners for
services provided as determined by title deeds, the Tenement Management
Scheme, and the Property Factors Agreement. 
13.2 The range of service charges currently levied by the HRA to tenants and owner
occupiers are shown in tables 2 and 3 below. All services, apart from the garden
maintenance scheme and communal heating at particular locations, are included
in tenants’ rents. Owner occupiers in locations with mixed tenure have additional
charges as they have to meet some costs for the services they receive as
determined by their title deeds. 
13.3 At the Housing and Health Committee of 27 January 2016, members agreed that
the charge to Council tenants and private owners at Market, Milne and Lickley
Court for communal energy costs will be adjusted each year to reflect the
previous year’s energy costs (Report No. 16/28 refers). 
13.4 The communal energy costs at Sheltered Housing Complexes are also normally
reviewed in line with the current agreement for Market, Milne & Lickley. 
13.5 As the charges are based on the energy costs over the previous 12 months, this
means that the charges to tenants and owners from April 2023 will not take into
account the significant increases in energy prices that everyone has experienced
over recent months. 
Page 109 of 250

Page 110

13.6 As it stands, the charges for 2023 would see a reduction in cost for all but one of
our properties. Normally the process would be to pass these savings directly onto
tenants and owners, but we are aware that the increase in energy costs is likely
to have a significant impact on these charges the following year. 
13.7 A consultation process with tenants and owners was undertaken to provide them
the opportunity to tell us if they would like us to help limit the significant increase,
they are likely to see in 2024 by phasing in the increase from April 2023. 
13.8 The consultation only related to the heating & lighting (energy costs) element of
the charges, this does not impact on any potential changes in any other charges
such as caretaking or any other factoring charges. 
13.9 The options that we consulted on were: 
• Option 1 - Implement next years’ service charges based on what the Council
has spent on communal heating and lighting over the last year, as normal.
This will see all but one property have a reduction in service charges. 
• Option 2 – Leave the charges the same as they currently are, which will help
to reduce next year’s increase. 
• Option 3 – Increase the current charges by 10% to significantly limit the
increase the following year,
13.10 A total of 136 (36%) people responded to the consultation, with the outcome as
follows: 
• Option 1 - 4%
• Option 2 - 65%
• Option 3 - 31%
13.11 The tables in sections 13.12 and 13.13 have been updated to reflect the outcome
of the consultation process detailed above. 
13.12  The revised charges for garden maintenance and communal energy costs are
outlined below: 
Service Charges to Tenants
2022/23
Current
Annual Charge
2023/24
Proposed
Annual Charge 
Garden Maintenance Scheme
Retirement Complexes 
£124.00
£227.76 
£124.00
£239.20
Communal Energy Costs –
(Market, Milne and Lickley)
£304.72 £304.72
Heating and Lighting at Sheltered
Housing complexes
£307.32 - 
£587.08
£307.32 -   
£587.08 
Table 2: Service Charges to Tenants3.13 As a result of the Property Factors 
Page 110 of 250

Page 111

13.13 Agreement being in place since 1 April 2014, Housing & Health Committee
approved a range of charges to owner occupiers of multi-tenure blocks (Report
No. 14/114 refers). These charges are reviewed annually in line with the actual
cost of the service being provided with the proposed 2023/24 charges detailed in
table 3 below: 
Service Charges to Owner
Occupiers
2022/23
Current
Annual Charge
2023/24
Proposed
Annual Charge 
Stair Lighting
Market Court
Milne Court
Lickley Court
Potterhill
Pomarium (Nos 7-51)
Pomarium (Nos 52-95) 
£28.88
£838.75
£838.83
£838.83
£463.48
£430.67
£431.32 
£28.88
£844.77
£844.86
£844.97
£471.74
£432.28
£432.88   
Table 3: Service Charges to Owner Occupiers 
Rechargeable Repairs 
13.14 The HRA has a policy to recover the costs of repairs, clearance, and related
works, from current or former tenants and owners/residents. Accounts are raised
for a number of reasons, including to: - 
• recover the cost of work arising from tenant misuse 
• consistently enforce the conditions of the Scottish Secure Tenancy
• deter misuse and negligence of Council property 
13.15 A summary of all housing charges for 2023/24 is detailed at Appendix 6. 
14. CONCLUSION 
14.1 This report details the proposed HRA budget for the 5-year period from 2023/24 -
2027/28 and recommends rent increases for houses and other HRA properties.  
14.2 The recommended 2.2% increase, detailed in option 1, is in line with the views of
our tenants. This will ensure that our rent levels remain affordable to our tenants
and projected to be 7th lowest in Scotland, continue to compare favourably at a
national level. 
14.3 The measures outlined will support continued and sustained improvements in the
delivery of housing services. More specifically, they will: 
• provide investment in our repairs and maintenance and service and
maintenance budgets to meet the current level of demand and ensure that
performance standards are met
Page 111 of 250

Page 112

• ensure that our properties have an up-to-date electrical inspection condition
reports to meet our legal obligations
• provide capacity to enable us to work towards our climate change targets by
reducing the carbon footprint of our homes whilst making sure they remain
affordable to heat.
• increase our housing stock and support the delivery of our new build
commitments and meet housing need in the area.
• continue to invest in their homes through the capital investment programme
ensuring ongoing compliance with the SHQS 
14.4 The cumulative effect of these measures will support the delivery of the Charter
outcomes to meet housing need in the area, provide safe and secure housing,
and support sustainable tenancies and communities throughout the area.   
Authors
Name  Designation Contact Details
Steven Coyle 
Elaine Ritchie 
Finance & Governance Team
Leader 
Senior Service Manager
(Communities)
ComCommitteeReports@pkc.gov.uk  
01738 475000 
ComCommitteeReports@pkc.gov.uk  
01738 475000 
Approved 
Name Designation Date 
Barbara Renton Executive Director (Communities) 17 January 2023 
APPENDICES
• Appendix 1 – HRA Provisional Revenue Budget 2023-2028
• Appendix 2 – Feedback from tenant’s rent survey
• Appendix 3 – HRA Executive Summaries 2023-2028
• Appendix 4 – HRA Capital Investment Programme 2023-2028
• Appendix 5 – Estimated Projected Average Rents
• Appendix 6 – Housing Related Charges 2023-24 
Page 112 of 250

Page 113

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  None 
1. Strategic Implications 
Community Plan / Single Outcome Agreement 
1.1 The Single Outcome Agreement for Perth and Kinross has five outcomes which
provide a clear strategic direction, inform decisions at a corporate and service
level, and shape the allocation of resources. The following are relevant to this
report: - 
(i) Giving every child the best start in life
(ii) Developing educated, responsible, and informed citizens 
(iii) Promoting a prosperous, inclusive, and sustainable economy 
(iv) Supporting people to lead independent, healthy, and active lives
(v) Creating a safe and sustainable place for future generations 
Corporate Plan 
1.2 As above. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than those
reported within the body of the main report. 
Page 113 of 250

Page 114

3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate discrimination,
advance equality of opportunity, and foster good relations between equality
groups. Carrying out Equality Impact Assessments for plans and policies allows
the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and no major change
required, the Budget Option is robust and can continue without amendment. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the Council
to identify and assess the environmental consequences of its proposals. 
3.4 However, no action is required as the Act does not apply to the matters presented
in this report. This is because the Committee are requested to note the contents
of the report only and the Committee are not being requested to approve, adopt,
or agree to an action or to set the framework for future decisions. 
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the Council
has to discharge its duties in a way which contributes to the achievement of
sustainable development. Under the Climate Change (Scotland) Act 2009 the
Council also has a duty relating to climate change and, in exercising its functions
must act: - 
• in the way best calculated to delivery of the Act’s emissions reduction targets
• in the way best calculated to deliver any statutory adaptation programmes
• in a way that it considers most sustainable. 
3.6 The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Legal and Governance 
3.7 Head of Legal and Governance was consulted on this report. 
Risk 
3.8 None arising from this report. 
Page 114 of 250

Page 115

4. Consultation 
Internal 
4.1 The Chief Executive, all Executive Directors/Directors and the Head of Legal and
Governance have been consulted in the preparation of this report. 
External 
4.2 All tenants received communication on the proposals via “On the House”
magazine, Twitter, Facebook, and text messages. Staff across the service also
undertook phone surveys and face to face visits. 
4.3 The Tenant Committee Report Panel was consulted on this report. They
commented that “This is a good, clear balanced report and a high response rate
to the survey. It is good to see the range of support measures that are in place to
help tenants. Well done to all the staff..” 
5. Communication 
5.1 None. 
2. BACKGROUND PAPERS 
2.1 None. 
Page 115 of 250

Page 116

Page 116 of 250

Page 117

APPENDIX 1
HOUSING REVENUE ACCOUNT 
2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 
Approved Proposed Provisional Provisional Provisional Provisional 
Budget Budget Budget Budget Budget Budget  
£'000 £'000 £'000 £'000 £'000 £'000
STAFF COSTS      
Single Status - Gross Pay 5,725 6,186 6,629 6,846 7,072 7,306    
Supn 973 1,052 1,125 1,161 1,198 1,236
NI 581 590 634 655 677 700
Craft Workers - Gross Pay 1,717 1,850 1,981 2,045 2,112 2,181    
Supn 292 315 337 348 359 370
NI 173 175 188 195 202 210
Pensions 110 110 110 110 110 110
Overtime 78 78 78 78 78 78
Slippage (277) (377) (377) (377) (377) (377)
General Fund Recharges 1,036 211 211 211 211 211
Other Staff Costs 191 253 253 253 253 253
TOTAL STAFF COSTS 10,599 10,443 11,169 11,525 11,895 12,278       
PROPERTY COSTS      
Non Domestic Rates 98 98 98 98 98 98
Rents 33 33 33 33 33 33
Water & Sewage 4 4 4 4 4 4
Energy Costs 300 452 537 587 617 637
Property Insurance 379 379 379 379 379 379
Cleaning 65 65 65 65 65 65
Property Maintenance 3,990 4,498 4,669 4,775 4,881 4,887
Void Rent Loss 418 420 420 420 420 420
Bad Debt Provision 1,151 1,204 1,261 1,315 1,367 1,421
Other Property Costs 10 10 10 10 10 10
TOTAL PROPERTY COSTS 6,448 7,163 7,476 7,686 7,874 7,954       
TOTAL SUPPLIES & SERVICES 2,114 2,328 2,563 2,738 2,931 3,143       
TRANSPORT COSTS      
Travel & Subsistence 70 71 71 71 71 71
Car Allowances 0 0 0 0 0 0
Other Transport Costs 526 526 526 526 526 526
TOTAL TRANSPORT COSTS 596 597 597 597 597 597       
TRANSFER PAYMENTS 344 345 345 345 345 345       
THIRD PARTY PAYMENTS 132 129 129 129 129 129       
SUPPORT SERVICES 2,354 3,153 3,153 3,153 3,153 3,153       
FINANCING/CAPITAL CHARGES 7,510 7,542 7,542 7,642 7,742 7,842       
CFCR 2,615 2,055 1,918 2,248 2,520 2,752       
GROSS EXPENDITURE 32,712 33,755 34,892 36,063 37,186 38,193       
INCOME      
Internal Recharges 1,012 1,067 1,067 1,067 1,067 1,067
Council House Rents 30,934 31,921 33,058 34,229 35,352 36,359
Other Rental Income 753 753 753 753 753 753
IORB 13 14 14 14 14 14
TOTAL INCOME 32,712 33,755 34,892 36,063 37,186 38,193
NET EXPENDITURE 0 0 0 0 0 0 
6
Page 117 of 250

Page 118

Page 118 of 250

Page 119

Appendix 2
Feedback from Tenants Rent Survey 
Question 1 - Improving your repairs service 
With 4 being the most important and 1 the least important, please rank each of
these statements from 1-4. 
Complete the repairs on the first visit wherever possible
• 1 – 7%
• 2 – 7%
• 3 – 18%
• 4 – 63%
• Not Answered – 5% 
Reduce the time it takes to start and complete a repair
• 1 – 9%
• 2 – 10%
• 3 – 21%
• 4 – 55%
• Not Answered – 5% 
Improve the quality of the repair and the quality of materials used
• 1 – 9%
• 2 – 9%
• 3 – 20%
• 4 – 57%
• Not Answered – 5% 
Make it easier to report a repair
• 1 – 15%
• 2 – 10%
• 3 – 15%
• 4 – 55%
• Not Answered – 5% 
Question 2 - Improving the quality of your home 
Quality of home - Improving the inside of your home (eg
kitchen/bathroom/internal doors/skirtings)
• 1 – 10%
• 2 – 11%
• 3 – 17%
• 4 – 56%
• Not Answered – 6% 
6
Page 119 of 250

Page 120

Quality of home - Improving the exterior of your home (eg painting, roof/gutter
cleaning)
• 1 – 11%
• 2 – 13%
• 3 – 22%
• 4 – 50%
• Not Answered – 4% 
Quality of home - Making my home more energy efficient
• 1 – 9%
• 2 – 8%
• 3 – 15%
• 4 – 61%
• Not Answered – 7% 
Quality of home - Improving the way we deal with dampness and condensation
• 1 – 10%
• 2 – 9%
• 3 – 15%
• 4 – 57%
• Not Answered – 9% 
Quality of home - Improving soundproofing and insulation in your home
• 1 – 13%
• 2 – 8%
• 3 – 19%
• 4 – 55%
• Not Answered – 5% 
Question 3 - Improving your neighbourhood as a place to live 
Improving neighbourhoods - Improving communal areas internally and
externally (eg close painting, bin storage or drying areas)
• 1 – 21%
• 2 – 15%
• 3 – 24%
• 4 – 34%
• Not Answered – 8% 
Page 120 of 250

Page 121

Improving neighbourhoods - Additional resources to respond quickly and to
tackle anti-social behavior where it arises
• 1 – 12%
• 2 – 13%
• 3 – 18%
• 4 – 50%
• Not Answered – 8% 
Improving neighbourhoods - Improving the landscape and maintenance of the
neighbourhood (such as fences/boundary walls)
• 1 – 10%
• 2 – 15%
• 3 – 27%
• 4 – 43%
• Not Answered – 5% 
Improving neighbourhoods - Increase the opportunities for community safety
improvements in relation to for example lighting in entrance ways
• 1 – 15%
• 2 – 15%
• 3 – 23%
• 4 – 40%
• Not Answered – 7% 
Question 4 - Information for tenants and participation 
Information and participation - Increasing the availability of the advice and
assistance in relation to increases in the cost of living, and accessing practical
and financial support
• 1 – 11%
• 2 – 14%
• 3 – 28%
• 4 – 40%
• Not Answered – 7% 
Information and participation - Increase the opportunities for you to participate
and have your say in the decisions we make (including for example digital
inclusion)
• 1 – 11%
• 2 – 22%
• 3 – 33%
• 4 – 26%
• Not Answered – 8% 
Page 121 of 250

Page 122

Information and participation - Improving communication across the Service
(eg repairs, complaints)
• 1 – 9%
• 2 – 10%
• 3 – 24%
• 4 – 51%
• Not Answered – 6% 
Information and participation - Providing more support to tenants to help them
keep their home
• 1 – 10%
• 2 – 10%
• 3 – 22%
• 4 – 52%
• Not Answered – 6% 
Page 122 of 250

Page 123

APPENDIX 3
Date:  7 December 2022
REVENUE BUDGET 2023/28
SERVICE – HOUSING REVENUE ACCOUNT
EXECUTIVE SUMMARY 
Activity Expenditure Pressure & Impact Analysis
Un-Funded Expenditure Pressures 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000
1 Increase in Staff Costs 
The increase in staff costs allows for a pay increase of 3% for Single Status and Trades staff for
2023/24 onwards plus the cost of incremental progression.  The costs for 2023/24 also includes the
cost of the increased level of pay award in 2022/23. 
Strategic Objective Impacted: Organised to Deliver 
706  345  356  370  383
2 Adjustment to Bad & Doubtful Debt Provision 
The increases relate to annual uplifts required in line with the anticipated increased income levels
each year to maintain the provision at 5%. 
Strategic Objective Impacted: Organised to Deliver   
53  57  54  52  54
3 Movement in Loan Charges
The capital investment programme has been revised to ensure we continue to meet the SHQS
obligations arising from the Stock Condition Survey, any future new Scottish Housing Quality
Standard and our tenant’s priorities.  These commitments alongside an increase in the Council House
Stock programme will result in revisions to the profile of Loan Charges arising from the revised
prudential borrowing assumptions to fund these works. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
0 0  100  100  100
6
Page 123 of 250

Page 124

Activity Expenditure Pressure & Impact Analysis
Un-Funded Expenditure Pressures 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000
4 Increased cost of Materials 
As a result of the Covid 19 pandemic we are facing difficulties in accessing some construction
industry supplies and materials.  As restrictions ease the demand for construction materials is now
very high. The supply of more commonly used materials is proving problematic for suppliers. It is
anticipated that current supply shortages will continue through to next year. 
The Housing Repairs Service procures materials and supplies via Scotland Excel.  Scotland Excel
have advised that there is a risk of shortages in commonly used materials but also of significant price
increases.  It is estimated that prices will continue to rise between 10 and 20% over the next 5 years. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
281  229  175  193  212
5 Electrical Inspection Condition Reports (EICR) 
As a landlord Perth & Kinross Council (PKC) are legally obligated to ensure all its domestic properties,
including common areas of sheltered housing, have a current Electrical Inspection Condition Report
(EICR). Properties are required to be tested every 5 years and additionally as and when there is a
change of tenant i.e., void properties. 
A rolling program of EICR’s will be undertaken to ensure all properties always remain compliant.  The
contract to commence this process was procured in 2021.  The key driver for this project is for PKC to
meet its legal obligations as a landlord by having a current EICR for all its properties within the
Council’s Housing stock. 
This pressure ensure we have the appropriate budget to carry out the work over the 5-year period and
an ongoing basis thereafter. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
100  100  100  100  0
Page 124 of 250

Page 125

Activity Expenditure Pressure & Impact Analysis
Un-Funded Expenditure Pressures 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000
6 Zero Carbon and Energy Efficiency 
The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 set legally binding targets
for Scotland to achieve net zero greenhouse gas emissions by 2045.   
A team is required to progress Climate Change improvements works for Council housing
properties.  A plan is necessary to develop works for the retrofitting of existing housing stock in order
to meet EESSH2 standards by 2032, to progress installations of new technologies within tenants
homes to support energy efficiency and behavioural changes, to engage in innovative projects such
as the Local Heat and Energy Efficiency Strategy (LHEES) which is a Council-wide project, and to
prepare funding bids and applications for grants such as the Social Housing Net Zero Heat Fund set
up by the Scottish Government to support social landlords across Scotland to install zero emission
heating systems and energy efficiency measures across their existing housing stock. 
This budget pressure is the cost of a team to deliver improvements works and to allow full
engagement in Climate Change strategies and relates to the full year effect of the pressure approved
in last year’s budget setting process. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
44  0  0  0  0
7 Service & Maintenance Costs 
As a landlord Perth & Kinross Council (PKC) are legally obligated to ensure that servicing and
maintenance is carried out to all emergency lighting within the communal areas of the Council’s
housing stock and the maintenance of mains fed sprinklers which have been and will continue to be
installed our new build housing. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
216  2  6  6  6
8 Schedule of Rates Uplifts 
Contract price increases for Term Maintenance Contracts and Domestic Gas Contracts. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
139  19  0  0  0
Page 125 of 250

Page 126

Activity Expenditure Pressure & Impact Analysis
Un-Funded Expenditure Pressures 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000
9 Increased Energy Costs 
Increased energy costs as a result of increasing Gas and Electricity prices. 
Strategic Objective Impacted: Organised to Deliver   
150  85  50  30  20
10 Increased Staffing Requirements 
As a landlord we are responsible for the cyclical servicing and maintenance of many systems and
items of equipment in domestic dwellings, multi-storey flats, and our sheltered housing complexes. 
Our current staffing resource is insufficient to ensure that we are meeting all the requirements and
obligations of these servicing and maintenance aspects.   
In addition to servicing and maintenance staff, we also require additional staff to deal with the EICR
contract, planned maintenance and multi-storey strategy. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
0 342  0  0  0
11 Estate Based Initiatives 
As part of the budget approved in February 2021, this budget was reduced by £150,000 to fund Digital
and Financial Inclusion for a 2 year period.  It has been agreed to continue the funding for Digital and
Financial Inclusion on a permanent basis and to part-reintroduce the savings from Estate Based
Initiatives. 
The budget for Estate Based Initiatives will be £200,000 after approval of this pressure. 
Strategic Objective Impacted: Supporting People to Live Independent, Healthy and Active Lives 
0 50  0  0  0
12 Additional Anti-Social Behaviour Measures 
As part of the budget approved in January 2022, a motion was approved for enhanced measures to
tackle Anti-Social Behaviour.  This has been funded from reserves for the last 2 years and now
requires permanent funding from 2023/24. 
Strategic Objective Impacted: Creating a Safe and Sustainable Place for Future Generations 
0 39  0  0  0
Page 126 of 250

Page 127

Activity Expenditure Pressure & Impact Analysis
Un-Funded Expenditure Pressures 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000
13 Asset Management Database 
Ongoing maintenance costs of the new database. 
Strategic Objective Impacted: Organised to Deliver 
0 6  0  0  0
14 Movement in relation to Contribution to Capital Projects (CFCR) 
As a result of the net movement between pressures and income/savings options this is the projected
movement in CFCR.  It is recommended that any surplus (CFCR) is used to fund capital spending,
thus reducing the borrowing requirement in the Housing Investment Programme and hence reduce
Capital Financing Costs in future years. 
The level of CFCR available each year will be as follows: 
2022/23 - £2,614,000
2023/24 - £2,055,000
2024/25 - £1,918,000
2025/26 - £2,248,000
2026/27 - £2,520,000
2027/28 - £2,752,000 
Strategic Objective Impacted: Organised to Deliver 
(559)  (137)  330  272  232 
TOTAL 1130 1137  1171  1123  1007 
Page 127 of 250

Page 128

Compensating Saving / Budget Flexibility &
Impact Analysis 
Net Saving  Staffing Implications 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000 
2023/24  2024/25  2025/26  2026/27  2027/28
1 Increase in Council House Rents 
In order to deliver on tenant’s priorities, meet the
fixed costs borne by the HRA, and any efficiency
savings, a 2.2% rent increase will be required for
2023/24. 
The proposed rent strategy for the next four years
will be set at an indicative rate of 2.2%.  This
provides a baseline level to highlight the
indicative rent increase required to deliver the
future capital investment programme and running
costs of the HRA.     
The indicative rate for future years may vary
reflecting future priorities identified by tenants.   
2022/23 – 2.2%
2023/24 – 2.2% (Provisional)
2024/25 – 2.2% (Provisional)
2025/26 – 2.2% (Provisional)
2026/27 – 2.2% (Provisional) 
Future provisional rents will be adjusted each
year to reflect anticipated levels required to meet
the needs of the HRA Business Plan. 
These updated income figures reflect revised
assumptions regarding increases in housing
stock, based on the planned progress in
delivering the new build and new supply
programmes. 
There are no increases attributed to Shops &
Offices. 
880  1137  1171  1123  1007  0.0  0.0  0.0  0.0  0.0
Page 128 of 250

Page 129

Compensating Saving / Budget Flexibility &
Impact Analysis 
Net Saving  Staffing Implications 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000 
2023/24  2024/25  2025/26  2026/27  2027/28
Impact Analysis and Risk Assessment 
Promote Fairness/Reduce Inequality/Address
Socio Economic Disadvantage: An affordability
assessment has been undertaken and evidenced
that our rents are affordable to 87% of the
population (without housing costs being taken
into account).  They remain the most affordable
social rent in the area and are the 6th lowest local
authority rent nationally.  Increases will affect all
tenants 
Workforce: None
Customer: Tenants will be consulted on the
Standard Delivery Plan and proposed levels of
rent increase. 
Equalities / Diversity: No identified
equality/diversity issues
Outcome and Performance: This will allow
Perth & Kinross Council to continue to meet the
requirements of the Scottish Quality Housing
Standard.
Climate Change: No significant impact identified.
Strategic Objective Impacted: Supporting
People to Live Independent, Healthy and Active
Lives 
2 Review of Non-Staff Budgets
A review of existing budgets and expenditure for
non-staff budgets.
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address
Socio Economic Disadvantage: The efficiencies
identified allow us to maintain rents at an
affordable level.
Workforce: None 
150  0  0  0  0  0.0  0.0  0.0  0.0  0.0
Page 129 of 250

Page 130

Compensating Saving / Budget Flexibility &
Impact Analysis 
Net Saving  Staffing Implications 
2023/24
£000 
2024/25
£000 
2025/26
£000 
2026/27
£000 
2027/28
£000 
2023/24  2024/25  2025/26  2026/27  2027/28
Customer: None
Equalities / Diversity: No identified
equality/diversity issues
Outcome and Performance: None          
Climate Change: No significant impact identified.
Strategic Objective Impacted: Organised to
Deliver                                                        
3 Increase in Staff Slippage Target 
Increase in the staff slippage target to 4% to
match the general fund slippage target. 
Impact Analysis and Risk Assessment
Promote Fairness/Reduce Inequality/Address
Socio Economic Disadvantage: The efficiencies
identified allow us to maintain rents at an
affordable level.
Workforce: None
Customer: None
Equalities / Diversity: No identified
equality/diversity issues
Outcome and Performance: None
Climate Change: No significant impact identified.
Strategic Objective Impacted: Organised to
Deliver 
100  0  0  0  0  0.0  0.0  0.0  0.0  0.0 
TOTAL 1130 1137 1171 1123 1007 0.0 0.0 0.0 0.0 0.0 
Page 130 of 250

Page 131

APPENDIX 4
HRA CAPITAL INVESTMENT PROGRAMME 2022-28
2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
SERVICE £'000 £'000 £'000 £'000 £'000 £'000
Central Heating & Rewiring 864 0 0 0 0 0
Rewiring/Infrastructure/Property Refurbishment 941 1,000 1,686 0 0 0
Triple Glazing 111 0 0 0 0 0
Controlled Door Entry 33 0 30 0 0 0
Kitchen Programme 290 1,832 1,504 625 0 0
Bathroom Programme 1,110 0 0 0 0 0
External Fabric Repairs 2,200 598 528 625 0 0
Energy Efficiency 331 0 875 625 0 0
Multi-Storey Flats 290 2,000 0 0 0 0
Environmental Improvements 602 333 0 0 0 0
Fire Precaution Measures 524 0 0 0 0 0
Electrical Testing Priority 3's 0 0 0 0 0 0
Sound Insulation 140 162 100 42 0 0
Structural 20 458 250 522 0 0
SHQS Future Development 0 0 0 7,216 10,030 10,030
7,456 6,383 4,973 9,655 10,030 10,030
Council House New Build - Current Programme 0 0 0 0 0 0
Milne Street 3 0 0 0 0 0
Glebe 21 0 0 0 0 0
Huntingtower 2 0 0 0 0 0
Ardler Road, Meigle 0 0 0 0 0 0
Fairfield, Perth 1,641 0 0 0 0 0
Newburgh Road, Abernethy (294) 0 0 0 0 0
Lynedoch Road, Methven 808 1,039 0 0 0 0
Council House New Build - Future Programme 3,751 4,894 5,128 6,014 6,014 6,014
Increase in Council House Stock 2,248 3,000 3,000 3,000 3,000 3,000
Lock-ups & Garage Sites 0 0 50 0 0 0
Major Adaptations to Council House Stock 4 0 100 0 0 0
Balmoral Road, Rattray Refurbishment (3 units) 273 0 0 0 0 0
Rannoch Road Conversion, Perth (5 units) 109 0 0 0 0 0
149-151 Dunkeld Road, Perth 25 0 0 0 0 0
Rannoch Road ILG 227 0 0 0 0 0
St Catherine's Square Redevelopment 0 2,991 402 0 0 0
Shops & Offices 192 50 50 0 0 0
Greyfriars 34 0 50 0 0 0
Sheltered Housing 13 0 5 0 0 0
General Capital Works 31 0 0 0 0 0
Replacement Lifts 143 0 0 0 0 0
ICT 178 50 50 0 0 0
Mortgage to Rent 125 50 50 0 0 0
16,990 18,457 13,858 18,669 19,044 19,044
(2,458) (2,055) (1,918) (2,248) (2,520) (2,752)
0 0 0 0 0 0
Less: Other Income 0 0 0 0 0 0
14,532 16,402 11,940 16,421 16,524 16,292PRUDENTIAL BORROWING REQUIREMENT
STANDARD DELIVERY PLAN SUBTOTAL:
SUBTOTAL = TOTAL GROSS EXPENDITURE
Less: Amount to be funded from Current Revenue (C.F.C.R.)
Less: Amount to be funded from Capital Receipts
6
Page 131 of 250

Page 132

Page 132 of 250

Page 133

Appendix 5
Scottish Average Rents
Per Dwelling (£ per house per week) 
Actual
2022-23
Estimated
2023-24
Estimated    
% Increase 
rank         
2022-23
Estimated
rank      
2023-24 Movement
City of Edinburgh 102.11  102.11  0.00% 1 1 →
Orkney Islands 85.42  87.64  2.60% 2 2 →
Aberdeenshire 85.37  86.65  1.50% 3 3 →
West Dunbartonshire 84.27  85.96  2.00% 4 4 →
East Renfrewshire 83.23  84.06  1.00% 5 5 →
Renfrewshire 82.19  83.83  2.00% 6 6 →
West Lothian 80.70  83.12  3.00% 8 7 ↑1
East Dunbartonshire 80.40  82.41  2.50% 10 8 ↑2
Shetland Islands 82.02  82.02  0.00% 7 9 ↓2
Dundee City 80.49  81.70  1.50% 9 10 ↓1
South Ayrshire 79.33  80.52  1.50% 12 11 ↑1
Fife 78.49  80.45  2.50% 13 12 ↑1
North Ayrshire 78.45  80.41  2.50% 14 13 ↑1
Scotland 79.14  80.41  1.60%      
Clackmannanshire 77.90  80.31  3.10% 15 14 ↑1
Aberdeen City 79.34  79.34  0.00% 11 15 ↓4
North Lanarkshire 76.50  78.80  3.00% 19 16 ↑3
South Lanarkshire 76.50  78.18  2.20% 18 17 ↑1
East Ayrshire 76.51  77.66  1.50% 17 18 ↓1
Midlothian 77.10  77.10  0.00% 16 19 ↓3
Perth & Kinross 73.61  75.23  2.20% 21 20 ↑1
Falkirk 73.31  74.78  2.00% 22 21 ↑1
Highland 73.88  74.62  1.00% 20 22 ↓2
Angus 72.91  73.64  1.00% 23 23 →
East Lothian 72.50  72.50  0.00% 24 24 →
Stirling 71.63  72.42  1.10% 25 25 →
Moray 64.67  65.64  1.50% 26 26 → 
Please note that rank 1 is the highest rent in Scotland and an upward movement means that the
Council has become more expensive.   
The above table predicts the position of Perth & Kinross based on a rent increase of 2.2% and the
assumption that every other Council will increase their rents by the same as last year.
6
Page 133 of 250

Page 134

Page 134 of 250

Page 135

Appendix 6
Housing Related Charges 
Mainstream Accommodation
Mainstream Rent Rent ranges from £44.51 - £107.29 per week 
Temporary Homeless Accommodation
Bed and Breakfast Charge depends on establishment rate and family / room size
Dispersed Tenancies Rent ranges from £44.51 - £107.29 per week 
Greyfriars Hostel Rent - £64.44 per week
Heat & Light - £11.90 per week
St Catherine’s Square Rent ranges from £50.21 - £67.34 per week
Sheltered Housing
Sheltered Housing (PKC) Rent ranges from £50.21 - £84.47 per week
Retirement Complexes £239.20 per year
Other Accommodation Services
Rechargeable repairs Cost varies depending on the extent of the works
Inappropriate emergencies £40 per call out
Planned maintenance Cost varies depending on the extent of the works
Stair lighting £28.88 per year
Lock-up rent £9.65 per week (Council Tenants)
£11.58 per week (Non-Council Tenants)
Garage Site £2.31 per week
Heat and lighting         
(Council Tenants)
Sheltered Housing - £307.32 - £587.08 per year
Market, Milne and Lickley Court - £304.72 per year
Multi-Tenure Blocks 
(Owner Occupiers)
Market, Milne and Lickley Court - £844.77 - £844.97 per year
Potterhill & Pomarium - £432.28 - £471.74 per year
Legal expenses Single Tenant - £300 - £400
Joint Tenant - £300 - £400
Eviction fees/costs - £200 - £300
Garden Maintenance £124 per year 
6
Page 135 of 250

Page 136

Page 136 of 250

Page 137

PERTH AND KINROSS COUNCIL 
Housing & Social Wellbeing Committee 
25 January 2023 
UPDATE ON PARTICIPATION IN THE GYPSY/TRAVELLER NEGOTIATED
STOPPING PROJECT AND APPROVAL FOR A TRANSIENT SITE FOR VISITING
GYPSY TRAVELLERS 
Report by Head of Environmental and Consumer Services 
(Report No. 23/10) 
1. PURPOSE 
1.1 This report provides an update to members of the Committee on Perth and
Kinross Council’s participation with the Gypsy/Travellers Negotiated Stopping
Pilot and seeks approval for a transient site at North Muirton, Perth.   
2. RECOMMENDATIONS 
2.1  It is recommended that the Housing & Social Wellbeing Committee:   
• agrees continued participation in the Scottish Governments/COSLA’s
Negotiated Stopping Places Pilot until full evaluation is conclude in
September 2023 
• approves the development of a transient site within the boundary of
the Food & Drink Park, Arran Road, Perth. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues
• Section 5: Proposals
• Section 6: Conclusion 
4. BACKGROUND / MAIN ISSUES 
4.1 In the Scottish Government’s (SG) action plan entitled ‘Improving the Lives of
Scotland’s Gypsy/Travellers (2019-21), it is recognised by national and local
governments that, in a modern and inclusive Scotland, there is no place for
the widespread exclusion, deprivation, and social antipathy suffered by
Gypsy/Travellers.  The Council has a responsibility to provide services to all
members of the community, including those travelling through the area
temporarily. 
7
Page 137 of 250

Page 138

4.2  In recent years, it has become apparent the needs of the Gypsy/Travellers are
changing, and that the current arrangements are not adequately meeting
these needs.  In turn, this is also creating additional pressures on Council
services, a well as frustration within local communities. 
4.3  Perth & Kinross has a history of Gypsy/Travellers visiting and working in the
area and has a large number of Gypsy/Travellers who have settled within
various local communities. 
4.4 Approximately 20 temporary Gypsy/Traveller encampments arrive in Perth &
Kinross each year, with a large percentage now stopping in Perth City,
particularly at North Muirton. The size of the encampments can vary from 2 to
6 caravans on average, to larger, lengthier encampments comprising of
multiple groups of 11 to 16 caravans. The average length of stay is around 50
days, which has significantly increased in recent years.  Appendix 1 provides
details of encampment locations, numbers and length of stays. 
4.5 For each encampment, there are significant resource implications for a variety
of council services along with considerable costs in removing waste and
supplying sanitation. 
4.6 The need for a transient site has been recognised by the Council for some
time. In 2019, the previous Housing and Communities Committee approved
the Council’s participation in a Negotiated Stopping Pilot (Report No 19/145
refers), which would be overseen by the Scottish Government (see committee
paper here). It was hoped that this pilot would strengthen and support
implementation of national guidance on managing temporary encampments in
Scotland. 
4.7 Negotiated stopping places are an alternative to the traditional enforcement-
based approach to ‘unauthorised’ encampments. The approach involves open
dialogue and negotiation between the Council and Gypsy/Travellers who pass
through the area. The core principles of the pilot focused on encouraging
Gypsy/Travellers to: 
• stop in an acceptable location (and not reuse this location within a year)
• stay for an agreed period of time (no greater than 28 days) and, 
• adhere to a code of conduct specified by the Council which requires
residents to sign up to a variety of agreements e.g., to prevent damage to
the site, minimise nuisance to neighbouring properties etc.  
4.8 The core principles would also enable local authorities to provide vital services
and support to encampment residents, as well as avoid the need for
protracted legal action, particularly when encampments were in unsuitable
locations. 
Page 138 of 250

Page 139

4.9 Unfortunately, participation in the negotiated stopping pilot highlighted that
there were no obvious appropriate stopping places identified, and agreed
upon, by visiting Gypsy/Travellers and council officers. To address this issue,
an officer working group was established to identify potential stopping sites. A
site option appraisal was conducted and involved the screening of 25 potential
sites against a range of criteria (e.g., location, health & safety, ground
conditions, existing use and feedback from local community and ward
members etc). This process was assisted by two Gypsy/Travellers from a
local permanent Gypsy/Traveller site and local Gypsy/Traveller groups. The
appraisal identified three potential site options: 
1. North Muirton, Perth.
2. North Forr, Crieff and
3. Turfhills, Kinross. 
4.10 However, it was quickly established from recorded encampment data and
feedback that there was less demand for a site in Kinross or Crieff. 
4.11 It also became apparent that the needs of the visiting Gypsy/Travellers were
changing, contrary to the principles of the pilot, in that: 
• stays were getting lengthier - well beyond the proposed 28 days,
especially in Perth City and 
• there was a reluctance of visiting Gypsy/Travellers to sign the Code of
Conduct as a result of having no control of the site or land when they were
not present.
4.12 Although core support requirements are offered to every encampment, the
desired support from services cannot always be effectively provided.  This is
because negotiations are often focused on reactive issues or residents
immediate short term needs until they move on. In these circumstances,
officers have no opportunity to build up a rapport or trust with residents to fully
establish their longer-term needs. 
4.13 During the pandemic, PKC supported an encampment comprising of 11
families for a period of 9 months. This support was delivered in line with the
Scottish Government Guidance Covid 19 Framework for Local Decision
Making on Gypsy/Traveller Support.  This guidance encouraged local
authorities to support Gypsy/Travellers in settled camps to provide sanitation,
health advice and other appropriate services without the threat of eviction.
Given the positive impact of the guidance, it has remained in operation, and
has been viewed as good practice. 
4.14 As a result of this guidance, and feedback received, the officer working group
concluded that the approach to responding and supporting visiting
Gypsy/Travellers should be reviewed. It was also clear that the Negotiated
Stopping criteria was not meeting the current needs of visiting
Gypsy/Travellers, or the local community. 
4.15 As such, officers believe that the development of a transient site would be a
more appropriate solution to meeting the needs of visiting Gypsy/Travellers. 
Page 139 of 250

Page 140

Through the screening process, and data gathered by the working group, it
has been identified that the most desirable site is land north of the existing
Food & Drink Park, Arran Road, Perth.  This piece of land is commonly used
by visiting Gypsy/Travellers as: 
• it is a historical stopping off site with a rural aspect close to the River
Almond
• it is close to local services and can be easily accessed
• there are no residential homes in the immediate vicinity (as preferred by
encampment residents)
• there is access on to the main road networks and sufficient area for small
animals to be accommodated
• there is a variety of work opportunities in and around the city
4.16 The Food and Drink Park at North Muirton was initially developed to provide
circa 21 acres (gross) of development land to encourage local businesses to
produce and supply their products to the local and national market. Perth and
Kinross is renowned for leisure and tourism and the Food and Drink Park
helps promote and encourage local businesses to supply this industry, which
in turn supports local employment. 
4.17 A further 10 acres (gross) of land was subsequently acquired from Scottish
Water for an expansion to the site. The extended site has now been expanded
to include not just for Food and Drink uses but also for general industrial use,
which again supports local employment. 
4.18  It is anticipated that the Travellers site will have minimal impact on the existing
users and future sites, due to its location at the north-eastern corner of the
Park. The proposed site has existing screening to the north and eastern
boundaries.  In addition, it is proposed that a sympathetic screening will be
designed to the western and southern boundaries to reduce any perceived
impact on existing and future occupiers. 
4.19 A plan has been attached in Appendix 4 which shows the location of the
proposed Gypsy/Travellers site in relation to the sites which have been sold
and those that are still available for sale.                   
4.20 Despite the above, concerns have been raised about the presence of a
transient site within this area.  These concerns relate to the potential impact
on current businesses and attracting new development opportunities to the
area. 
4.21 To discuss and explore these concerns further, consultation regarding a
proposed site, was undertaken with PKC officers, local businesses, and
relevant council elected members.  The local Community Council was also
informed of the proposal. In general, it was accepted that a transient site in
this location would be an improvement for all concerned.  Businesses
acknowledged that, in the absence of such a site, it was highly likely that
unauthorised encampments would continue. Therefore, a managed site,
sympathetically landscaped, provided with appropriate amenities would be
more desirable.
Page 140 of 250

Page 141

5. PROPOSALS 
5.1 It is proposed that the Council acknowledge that the implementation of the
Negotiated Stopping Pilot has not met the needs of local visiting
Gypsy/Travellers, but it has provided a forum to identify and assess their
changing needs. 
5.2 The Scottish Government and COSLA are keen that Perth & Kinross Council
continue their participation in the pilot until its conclusion in September 2023,
in order to provide essential evaluation feedback. There is an indication that a
number of other Local Authorities are experiencing similar challenges and
additional transient sites across Scotland may be recommended as part of the
conclusion of the pilot. Notwithstanding our withdrawal in September 2023,
the principles of the pilot will continue to be adopted, wherever appropriate. 
.
5.3 The North Muirton site, located to the most northernly boundary of the Food
and Drink Park, has been identified as a potential suitable site, particularly as
the over-riding factor for any potential site is the Gypsy/Travellers willingness
to use the site. The Food and Drink Park is by far the most popular site with
Gypsy/Travellers visiting Perth City.  
5.4 It is acknowledged that significant investment in the provision of a transient
site would be required.  However, there is also the potential to develop a site
on a phased basis, over a longer period, which may be more financially viable. 
5.5 Appendix 3, Table 1 contains three potential site options comprising a
different range of site facilities, summarised as follows: 
• Option 1 – The costliest option to provide a fully developed site which
meets and exceeds current and national guidance and standards by
providing additional on-site management and support facilities and
optimising pitch capacity and usage. 
• Option 2 - This option meets current national standards and guidance and
provides the desired number of pitches, but does not provide the on-site
management support facilities. However, there is potential to add the
remaining site facilities detailed in Option 1, at a later date, in order to
future proof the service. 
• Option 3 - The cheapest option which meets standards, but only
accommodates a small number of caravans. However, similar to Option 2,
it has capacity for additional pitches and on-site management facility to be
added at a later date. 
5.6 The preferred option is Option 2. This is for the provision of 6 pitches, 6
caravans, which will accommodate one large or two smaller families to stay
on-site with adequate service provision but excludes the costs for an
additional building to accommodate a management presence and communal
space for residents. However, a management presence at the site will still be
provided, despite the lack of accommodation. This will be managed through
Page 141 of 250

Page 142

the use of SMART technology, sensors, as wells as routine checks and
monitoring, along with staff undertaking welfare checks.   
5.7 Of cost significance is the provision of an access road to the proposed site
which has been costed at approximately £450,000. However, discussions are
ongoing to determine if contributions from the creation of the Cross Tay Link
Road, through community benefits fund, could be utilised to assist in the
construction. There are also issues regarding on site drainage and this matter
would need to be addressed as part of the site assessment and scoping
exercise. 
5.8 With regard to the availability of funding, discussions with COSLA Officials
have confirmed that the Scottish Government’s new funding streams for
Gypsy/Traveller accommodation (2021-2026) offers an opportunity for bids to
be made for transient site provision (negotiated stopping sites are not eligible).
There is also a clear appetite from the Scottish Government for Local
Authorities to create transient provision and, in anticipation, PKC has
submitted a note of interest only at this stage.  It is, therefore, important to
note that no confirmed funding has yet been identified for the project. 
Therefore, potential funding options would need to be brought back to elected
members for any of the options identified above to be taken forward.   
6. CONCLUSION 
6.1 This report confirms that participation in the Negotiated Stopping Places Pilot
has provided the opportunity to gather valuable information which identifies
the modern needs of Gypsy/Travellers and the benefits in providing
alternative, longer stay accommodation options. However, it highlights that the
Negotiated Stopping criteria does not meet the current needs of visiting
Gypsy/Travellers, or the local community and, as such, PKC should withdraw
from the pilot, following its conclusion, in September 2023.   
6.2 The report also notes that the provision of a transient site, within the Food and
Drink Park, in North Muirton, Perth, which is developed in line with national
guidance and standards, would meet the needs of Gypsy/Travellers much
more effectively.  This approach would provide support and assistance which
meets current recommendations, foster better relations with settled
communities and provide a more managed approach to the current ongoing
demands placed on Council services and budgets. Further work is being
undertaken to identifying funding opportunities for the transient site and
access road.  
Page 142 of 250

Page 143

Author(s)
Name  Designation Contact Details
Kirsty Steven  Principal Officer,
Environmental Health
01738 475000
KSteven@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
17 January 2023 
APPENDICES 
• Appendix 1 – Local Temporary Encampment data.
• Appendix 2 – Location of proposed transient site - Food and Drink Park, Arran
Road, Perth
• Appendix 3 - Table 1 and 2 Proposed Transient Site – Option provision and
appraisal
• Appendix 4 - Location of the proposed Gypsy/Travellers site in relation to the
sites which have been sold and those that are still available for sale.         
Page 143 of 250

Page 144

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
2. Strategic Implications  
Community Plan/Single Outcome Agreement 
2.1 The proposal aims to provide a better solution for the Gypsy/Traveller
community and therefore would directly contribute to the delivery of the Perth
and Kinross Community Plan/Single Outcome Agreement in terms of: 
2.2 “Creating a safe and sustainable place for future generations”. 
Corporate Plan 
2.3 As above, the proposal in this report would directly contribute to the
achievement of the Council’s Corporate Plan priority: 
2.4 “Creating a safe and sustainable place for future generations”. 
Page 144 of 250

Page 145

3. Resource Implications
Financial 
3.1 It is important to note that no confirmed capital funding has been identified for
the development of a transient site, therefore at this stage agreement is
simply being sought for approval to develop a site.  Potential capital funding is
available from the Scottish Government, and it is possible that funding would
also be required from the Council. Any funding requirement would be the
subject of a future report to elected members. 
Workforce 
3.2 There are no human resource implications at this stage. 
Asset Management (land, property, IT) 
3.3 There are no asset management implications at this stage.   
4. Assessments 
Equality Impact Assessment 
4.1 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
4.2 The information contained within this report has been considered under the
Act. However, no action is required as the act does not apply to the matters
presented in this report. 
Legal and Governance 
4.3      Head of Legal and Governance was consulted on this report. 
Risk 
4.4 Not applicable. 
5. Consultation
Page 145 of 250

Page 146

Internal 
5.1 Heads of Service and senior managers from Communities have been
consulted on the content of this report. 
5.2 An officer working group was created to determine the needs of visiting
Gypsy/Travellers.  This group comprised officers from Regulatory Services,
Housing, Greenspace, Equalities, Estates and was chaired by the Head of
Environmental and Consumer Services. 
External 
5.3 Discussions have taken place with local elected members, the local
Community Council and local businesses with regard to the proposal in this
report.  All parties recognise the current on-going issues at the Food and
Drink Park and acknowledge that the proposals in this report offer a better
alternative to the current arrangements.   
6. Communication 
6.1 The recommendation to continue participation in the Negotiated Stopping
Places Pilot, will be communicated with all relevant internal and external
stakeholders. 
7. BACKGROUND PAPERS 
7.1 https://www.gov.scot/publications/improving-lives-scotlands-gypsy-travellers-
2019-2021 
Page 146 of 250

Page 147

Appendix 1
Local Temporary Encampment Data 
Perth Food & Drink Park – Gypsy/Traveller Encampment Data  
Year  Number of
Separate
Encampments
Throughout Year 
Lowest Number
of Caravans on
Site at any One
Time 
Highest
Number of
Caravans on
Site at any One
Time 
Shortest
Length of Stay  
Longest
Length of
Stay 
2014  2  3  7  4 days  20 days 
2015  3  2  3  11 days  21 days 
2016  4  1  12  7 days  66 days 
2017  6  1  14  1 day  102 days 
2018  2  1  5  15 days  24 days 
2019  4  2  5  3 days  126 days 
2020* 5  1  5  3 days  182 days 
2021* 9  1  11  3 days   400+ Days
(ongoing into
2022) 
2022 4  2  7  6 days  30+ days   
*COVID-19 pandemic ongoing, and SG Guidance recommended that G/Ts should refrain from
travelling as much as possible. 
Data comparing temporary encampments both within Perth City and Out with 
Location  Number of
Encampments Since
04/2014  
Average No. of
Caravans 
Average Length of Stay
(days) 
Perth 
Food & Drink Park,
Perth 
39  3  50 
Other Perth (including
old mart site) 
28  6  17 
Perth Total  67  4  33 
Out with Perth 
Ballinluig  7  4  11 
Broxden  11  4  4 
Fonab Industrial Estate  5  3  17 
Scone  5  5  5 
Kinross   12  4  8 
Other North (Pitlochry,
Crieff, Aberfeldy etc.) 
10  3  15 
Other West (Crieff,
Comrie etc.) 
8  4  13 
Northeast (Blairgowrie
etc.) 
7  3  38 
Bridge of Earn  3  9  16 
Out with Perth Total  68  4  14 
Perth & Kinross Total  135  4  25 
7
Page 147 of 250

Page 148

Page 148 of 250

Page 149

Appendix 2 
Proposed site boundary (red) and access road (hatched red) 
7
Page 149 of 250

Page 150

Page 150 of 250

Page 151

Appendix 3
Table 1: Site Facilities and Options regarding potential Transient Site at North
Muirton 
Site Facilities  Requirement  Option 1 Option 2 Option 3
Hard standings   A suitable hard-wearing
material which extends over
the whole area to be occupied
by a touring caravan or other
vehicle.
10 hard
standings to be
provided
6 hard standings
to be provided
4 hard standings
to be provided
Amenity Building  Small building providing access
to welfare facilities, kitchen
worktop, electrical sockets and
a communal room for site
management and resident use.   
Site Management
facility 
Office to provide facilities to
manage the site and for
residents to access – communal
space. 
No facility  No facility 
Toilet Facilities Toilets within the amenity
building 
4 toilets and 1
accessible toilet 
3 toilets and 1
accessible toilet
2 toilets and 1
accessible toilet
Showering Facilities Shower facilities within amenity
building 
3 showers (male
and female) and
1 accessible
shower room 
2 showers (male
and female) and
1 accessible
shower room
2 showers (male
and female) and
1 accessible
shower room
Water Supply One cold water supply to be
provided for the whole site.
This could be provided through
a water standpipe or water
bowser. 
Electrical Point One electrical charging point at
each pitch
10 points 6 points 4 points
Refuse and Recycling
Facilities
Refuse and recycling disposal
facilities to cater for the size of
the site   
Recreational area  Small grass area for children to
play.   
Animal Area Small, fenced area for animals
to be kept safely and securely.   
Estimated Road Provision  £450K £450K £450K
Total Cost £2.4M £1.8M £1.7M 
7
Page 151 of 250

Page 152

Site Design
Design  Consideration 
Site Layout When designing the layout of a site careful consideration must be given to the:
• health and safety of residents and in particular children in terms of entry and exit
points, including the use of effective signage 
• need for separate vehicular and pedestrian access 
• installation of traffic calming measures such as speed humps
• measures to ensure that appropriate drainage is accommodated 
• location of pitches in a circular or horseshoe design rather than the traditional
linear layout of pitches
Site Boundaries A range of different boundaries should be considered such as:
• bunding and planting, fences, low walls, hedges and natural features. 
• The aim should be to achieve a boundary that is sympathetic to and in keeping with
the surrounding area. Boundaries can also be used to provide shelter for more
exposed sites.
Size of Pitch  Pitch sizes should be in the region of 15x8.5m to accommodate a touring caravan and 
the towing vehicle.
Layout of Pitches  Each pitch should:
• be clearly demarcated to make it clear what each individual household may occupy
• aim to achieve a boundary that is clear, sympathetic to, and in keeping with,
surrounding areas.
Orientation of
Pitches 
In designing the layout of a site enough space must be provided to:
• permit the easy manoeuvrability of the residents own living accommodation both to
the site and subsequently on to a pitch
• ensure access roads and the site provide sufficient space for the manoeuvrability of
caravans and their towing vehicles
Access for
Emergency Vehicles
In designing a site, all routes for vehicles on the site must allow easy access for emergency
vehicles and safe places for turning. Emergency services should be consulted on the site
layout
Site Security  Site layout can play an important role in avoiding a sense of enclosure and isolation amongst
Gypsy/ Travellers. Security within the site should:
• be designed to ‘design out’ crime and social exclusion and ‘design in’ community
safety and social inclusion through openness of design, allowing ease in passing
through whether walking or driving
• Have a gated entrance in some sites to ensure the safety of children and provide an
element of security  
• enable residents to easily oversee all areas of the site 
Police Scotland should be consulted on site layout.
Hard Standing Each pitch must include:
• standings that are permeable and constructed in accordance with the industry code
of practice 
• a base that can bear the load placed on it by the home or vehicle and its contents,
and the anticipated level of vehicle movement. 
Page 152 of 250

Page 153

Table 2: Option Appraisal regarding site provision and potential phasing 
Option Appraisal
All Options  - Exceed or meets site standards
- Meets good practice and particular elements selected based on
benchmarking with various sites in Scotland and the UK as a whole
- Meets needs of Gypsy/Travellers who may have particular support
needs
- Positive feedback from Gypsy/Travellers and key partners 
Options Benefits Concerns
Option 1 - Provides more hard standings than is
currently required, based on current
need
- Providing more hard standings could
be considered as future proofing the
site, and cost effective in the long term
- Additional hard standings
could increase demand
- Costly option due to the
increased size
Option 2 - Provides the amount of hard
standings that is currently required,
based on current need
- Due to site layout and build, there is
an option to create even more hard
standings in the future, if need and
demand increases
- Although management
accommodation is not included this
can still be provided using current
service delivery method and the use
of SMART technology 
- Not as expensive as option 1
- Does not include the on-
site management
accommodation
- May require additional
funding if the site was to
be increased to meet
demand
Option 3 - Meets current need and demand
- Can be future proofed, made larger if
required – similar to option 2
- Although management
accommodation is not included this
can still be provided based using
current service delivery method and
the use of SMART technology 
- Not as expensive as options 1 and 2 
- Does not include the
number of hard
standings to meet current
need
- Does not include the on-
site management
accommodation 
- May require additional
funding if the site was to
be increased to meet
demand 
Page 153 of 250

Page 154

Page 154 of 250

Page 155

CULV
CULV
Perth Food & Drink Park
Arran Road
Perth
SITE PLAN
RD 1:2000
D/P/1062 - 2 22-12-2022
SITE 10a
1478 sq.m.
0.365 acre
SITE 10 (SOLD)
0.55 ha
1.355 acresSITE 11 (SOLD)
0.39 ha
0.969 acre
SITE 9 (AVAILABLE)
0.49 ha
1.207 acres
SITE 8 (AVAILABLE)
0.91 ha
2.259 acres
SITE 7 (AVAILABLE)
0.83 ha
2.049 acres
SITE 6 (AVAILABLE)
1 ha
2.4 acres
SITE 5
0.53 ha
1.329 acres
SITE 4 (SOLD)
0.42 ha
1.042 acresSITE 3 ( SOLD)
0.45 ha
1.129 acres
SITE 1 (SOLD)
0.44 ha
1.087 acres
SITE 2 (SOLD)
0.57ha
1.421 acres
SITE 12 (AVAILABLE)
2.84 ha
7.03 acres
© Crown copyright [and database rights] 2019. OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the organisation that
provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
SITE 12A Gypsey / Traveller Site
0.79 ha
1.95 acres
PKC LAND  PROPOSED FOR
GYPSEY / TRAVELLER
TRANSIENT SITE
PKC LAND ( AVAILABLE FOR DISPOSAL )
PKC LAND
PKC LAND ( SOLD )
LAND OWNERSHIP LEGEND
7
Page 155 of 250

Page 156

Page 156 of 250

Page 157

PERTH AND KINROSS COUNCIL 
Housing & Social Wellbeing Committee 
25 January 2023 
JUSTICE UPDATE REPORT 2021-22
Report by Executive Director (Education and Children’s Services)
(Report No. 23/11)
1. PURPOSE 
1.1 This report provides an update for Committee on the work of council services
and partners to meet local and national outcomes for Community Justice for
the period 1 April 2021 to 31 March 2022.  It provides an update on the
effectiveness of the arrangements for the supervision of serious offenders and
approaches being used to help people make positive changes in their lives
and tackling the underlying causes. 
2.        RECOMMENDATION
2.1 It is recommended that the Committee: 
• Notes the approach being undertaken by Perth and Kinross Council (PKC)
teams in respect of the Perth and Kinross Community Justice Partnership,
and the content of the 2021-22 Perth and Kinross Community Justice and
Safety Partnership Annual Outcome Activity Return submitted to
Community Justice Scotland. 
3.  STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Background
• Section 5:  Proposals
• Section 6:  Further Considerations
• Appendices 
4.  BACKGROUND 
The Perth and Kinross Community Justice Partnership 
4.1 The Community Justice (Scotland) Act 2016 (the Act) was passed by the
Scottish Parliament in 2017, along with the publication of the National
Strategy for Community Justice, and an Outcome Performance Improvement
Framework (OPIF).  It established a new model for the governance and
delivery of Community Justice in Scotland.   
8
Page 157 of 250

Page 158

The Act established Community Justice Partnerships (CJPs) in each local
authority area comprising of statutory partners - Police Scotland; Scottish
Prison Service (SPS); Scottish Fire and Rescue Service (SFRS); Skills
Development Scotland (SDS); NHS Scotland; Health and Social Care
Integration Joint Board; Scottish Courts and Tribunals Service, the local
authority; and representation from the third sector. 
4.2 The Act requires statutory partners to work together to deliver a Community
Justice Outcomes Improvement Plan (CJOIP), delivering on the National
Strategy and OPIF for their area, and report on progress to Community
Justice Scotland (CJS) via an Annual Outcome Activity Return.  The Perth
and Kinross Community Justice Partnership (PKCJP) launched its first CJOIP,
a three-year plan, on 1 April 2017 (the plan was extended in 2020 and again
in 2021 for a further year due to COVID-19).  Annual Outcome Activity
Returns have been submitted to CJS since 2018, highlighting PKCJP
progress against the CJOIP.  These reports are available on the Perth &
Kinross Community Justice and Safety Partnership (PKCJ&SP) website. 
4.3 The Community Justice Partnership and the Community Safety Partnership
with Perth and Kinross merged in September 2021 forming the PKCJ&SP. 
4.4 PKCJ&SP submitted the Annual Outcome Activity Return 2021-22 
(Appendix 1) to CJS in September 2022.  Appendix 2 provides a glossary of
terms used within the Return.  The Annual Return contains contributions from
statutory and third sector organisations.  The Annual Return highlights the
Partnership’s progress against the CJOIP and the OPIF. 
4.5 The reporting period spans a full year of COVID-19 restrictions (ie, routine
testing and isolation etc).  Although there were no lockdowns during the
reporting period, limitations on face to face and group meetings continued to
impact activity.  A more detailed summary of the associated challenges and
opportunities can be found in Appendix 1: PKJC&SP Annual Outcome Activity
Return 2021-22 
5.  PROPOSALS 
5.1 From a PKC perspective, the Annual Outcome Activity Return 2021-22
highlights examples of positive work being carried out by a range of PKC
teams, often in partnership with other stakeholders and includes: 
• One-Stop Women’s Learning Service (OWLS), in collaboration with
other services, offer women a safe space where they can access crucial
services, improve their mental health and wellbeing, as well as address the
reasons for their offending behaviour.  This wraparound service builds the
self-confidence and self-esteem of women enabling them to become more
involved in their community.  The co-production and joint delivery of
services improves access opportunities to services for women.  The whole
system approach enables needs to be met at a the time when the person
can accept the support.    
Page 158 of 250

Page 159

An example of the positive feedback received was: 
“Staff was flexible with my appointments which really helped me, they
helped with practical and emotional support, couldn’t have done it without
you.” 
Other examples of the support available via OWLS can be found in
Appendix 1. 
• Evolve, the men’s project continues to work from the Neuk, a local mental
health hub, which has provided opportunities to work collaboratively with
local mental health services.  For example, sharing access to counselling,
volunteers, and introducing men to the 24-hour support that is available
within the Neuk.  The service continues to explore connections with other
local third sector agencies such as Tayside Council on Alcohol and Andy’s
Man Club to inform the work undertaken, and to provide a wide range of
supports to service users.  The service aims to not only address the
causes of a man’s offending behaviour but promote positive life choices
and identities through using group work and communal activities which are
delivered in a trauma informed environment. 
During the reporting period, group work commenced (when COVID-19
restrictions allowed).  Although COVID-19 restrictions resulted in a
reduction in numbers, feedback from the group was positive, with the men
finding the support of their peers invaluable.  The service continues to
work with men in a trauma informed manner, using a combination of
intensive one to one work, and a focussed programme of group work
which will include activities designed to increase positive life chances and
pro-social decision making for males who offend, to help them find
purpose, improve their wellbeing and rebuild relationships within their
communities and families. 
• The Westbank Project is delivered from Westbank House where the
Unpaid Work Team (UPW) are based.  They have continued to engage
with the public via Facebook, the Council website and newsletters.  These
communications have detailed the work undertaken by the team to support
local communities, as well as providing engagement opportunities.  The
team received 273 requests for work to be carried out during 2021-22, a
significant increase on 72 requests received during 2020-21.  The total
number of requests remained lower than the 355 received in 2019-20 (pre
COVID-19). 
Examples of work undertaken (work as permitted under Scottish
Government COVID-19 guidelines) includes clearance of parts of Regional
Route 83, property repair/redecoration and maintenance work.  An
example of the positive feedback received from a member of the public
was: 
“What can I say other than thank you!!!! What a job that’s been done by
the team I can’t thank you enough for this.  I visited properties today and
Page 159 of 250

Page 160

was blown away by the difference that has been made. Please pass on my
thanks top every single person that was involved.” 
The Westbank Hub continued to provide opportunities to a range of         
community groups, including courses to learn new skills thereby helping
individuals to ready themselves for the job market.  During the reporting
period, three people took part in tele handling training, and four people
undertook forklift truck training following a Community Payback Order
(CPO), with one individual confirming they had gained employment.   
• Diversion from Prosecution Scheme, Criminal Justice Social Work
(CJSW) has continued to offer a diversion scheme which is delivered on a
one-to-one basis by a Criminal Justice Assistant (CJA).  The support looks
at behaviour which may put the person at risk of committing further
offences and to offer practical support and advice.  Where existing
services are in place, contact will take place to ensure that the person is
engaging and making best use of these resources.   
People participating in the Diversion scheme receive support to address
unmet need/offending behaviour and are diverted from the justice journey. 
In 2021-22, CJSW undertook 69 Diversion assessments, and of those, 38
Diversion cases commenced. 
• Bail Supervision focusses on reducing re-offending and affording the
person the opportunity to change their behaviour with appropriate support
and address unmet need.  There is also a positive impact for families,
children and the individual as it provides an opportunity for family, social
and economic relationships to continue in line with The Promise.   
An example of the positive feedback received was: 
“Bail Supervision provided me with support, in my housing, and helped me
sort my life out.” 
The Bail Supervision Service within Perth and Kinross (PK) extended the
eligible age criteria in January 2022 from between 16 to 26, to being
everyone aged 16 and over.  Extending the eligible age range provides
wider service access and provides the Courts with an alternative to
remand across the age range.   
Criminal Justice Assistants now support the Service in addition to the
dedicated support from the Young People’s Service to meet the increased
demand. 
The number of people receiving Bail Supervision has increased following
the extension of the Service.  Between April 2021 and April 2022, 
33 requests were received from the Court (bail opposed), an increase of 5
from the previous reporting period.  Bail Supervision was imposed in 16 of
those cases (increase of 9 from the previous reporting period); 17 were
granted bail without supervision and one person was remanded. 
Page 160 of 250

Page 161

At sentencing stage, 4 people were given a CPO, 2 were given Structured
Deferred Sentence (Right Track) and 2 were given a custodial sentence. 
The remaining people were awaiting a court decision. 
• Right Track (Structured Deferred Sentence)
This scheme run by CJSW works with individuals aged 16 to 26 and gives
them the opportunity to engage in intensive support provided by a Right
Track Officer prior to attending Court for final sentencing.  The scheme
helps ensure that remand is only used where necessary, and as Right
Track is also part of the work at the Westbank Project, it allows the young
person to work on their chaotic lifestyle and develop a more structured way
of life prior to being sentenced at Court.  Two examples of positive
feedback received was:     
“I find it a place to voice things when they go wrong, and it is really good to
be listened to.” 
“It has given me structure to my life.” 
The service had 14 young people participating in the programme during
April 2021.  During the reporting period, COVID-19 restrictions were still
impacting/limiting local Court business.  This number had increased to 25
young people by April 2022.  The increase reflects Court business
increasing, along with the Sentencing Young People’s Guidelines coming
into effect in January 2022.  The Right Track model operates within the
values and beliefs underpinning the new sentencing guidelines. 
• Caledonian System is an integrated approach to addressing domestic
abuse.  It combines a court-ordered programme for men, aimed at
changing their behaviour, with support services for women and children. 
Work was undertaken during the reporting period to improve resilience
within the team.   
The completion of Domestic Violence Court Report requests was extended
to those not Caledonian trained but trained in the use of the Spousal
Assault Risk Assessment-Version 3 (SARA-v3).  Domestic Violence Court
Report requests increased from 52 in 2020-21, to 85 in 2021-22.  Staff
within the team not trained in SARA-v3 were put forward for training.  Two
members of staff were also identified to become SARA trainers with the
intention of improving access to SARA training in the future, carried out in-
house, in partnership with Dundee CJS. 
All suitable staff not trained in the Caledonian system were identified and
put forward for screening assessment.  Three members of staff
successfully completed screening and await a placement on the fuller
training packages (Introduction to Caledonian; Case Manager training)
expected in 2022-23. 
• Prisoner Release work had commenced pre COVID-19 to improve co-
ordination of prisoner release (better links between prison and housing –
information sharing three months prior to release managing housing
needs) and the COVID-19 Early Prisoner Release Scheme.  Fortnightly
Page 161 of 250

Page 162

multi-agency meetings commenced in August 2021 and continue to run
fortnightly.   
The meetings are attended by CJSW, Safer Communities Team (SCT),
PKC Housing Team and the Integrated – Drug Alcohol and Recovery
Team (IDART), all working together to manage risks, provide support and
to address any accommodation issues.  The meeting frequency was set to
allow agencies time to react to any prisoners who received short
sentences or were released early.   
The model and frequency of meetings has been effective, and this model
of working has been adopted to support a new pilot, Custody Arrest
Referral Service (CARS) which was launched in July 2022. 
Proactive engagement and planning improve opportunities to address
issues, ie, housing issues in advance of release from prison, enhancing
the support available to prisoners on release.   
Work undertaken for the COVID-19 Early Prisoner Release Scheme has
been built upon and proactive planning for release has become
embedded.  Proactive planning takes place, including identification of
suitable housing and the provision of release packs to people being
released from custodial sentence to the PK area (including information for
accessing services such as NHS GP services and benefits help etc). 
From the launch of the meetings in August 2021 through to the end of
March 2022, 57 people were discussed/supported via the Prisoner
Release meetings.   
Table 1 below shows that 100% of PK residents were offered
accommodation on release between April 2021 to the end March 2022: 
Table 1
No. people Accommodation Type
52 (49%) Secure Tenancy (Council property/Registered Social
Landlord/Private Rent/Owner Occupier)
29 (27%) Temporary Accommodation (Greyfriars/Skinnergate/St
Catherine’s Square) with application in progress for secure
tenancy
26 (24%) Other (Sofa surfing/family/partner/moved to other
area/rehabilitation facility) 
6. FURTHER CONSIDERATIONS
Conclusion 
6.1 The PKCJ&SP Annual Outcome Activity Return 2021-22 illustrates the
positive work being undertaken by both statutory partners and third sector
organisations.  Partners and third sector organisations are committed to the
shared aim, echoed in the CJOIP, to work in partnership to reduce reoffending
and support those who have committed offences.  It is the intention of the
Page 162 of 250

Page 163

Partnership to build on this progress, thereby ensuring the communities in
Perth and Kinross remain safe places to live.  
6.2 It is recommended that the Committee:
• Notes the approach being undertaken by PKC teams in respect of the
Perth and Kinross Community Justice Partnership, and the content of the
2021-22 Perth and Kinross Community Justice and Safety Partnership
Annual Outcome Activity Return submitted to Community Justice Scotland. 
Authors
Name Designation Contact Details
Eleanor Lindsay 
Derek Mortimer
Community Justice
Partnership Co-ordinator 
Acting Service
Manager, Criminal
Justice Social Work
Service
ECSCommittee@pkc.gov.uk 
01738 475000 
Approved
Name Designation Date
Sheena Devlin  Executive Director
(Education and Children’s
Services)
22 December 2022 
Page 163 of 250

Page 164

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes/None
Community Plan/Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) None
Legal and Governance  None
Risk None
Consultation 
Internal  None
External  None
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This section sets out how the proposals relate to the delivery of the Perth and
Kinross Community Plan/Single Outcome Agreement in terms of the following
priorities: 
(i) Giving every child the best start in life;
(ii) Developing educated, responsible and informed citizens;
(iii) Promoting a prosperous, inclusive and sustainable economy;
(iv) Supporting people to lead independent, healthy and active lives; and
(v) Creating a safe and sustainable place for future generations. 
This report relates to Objective No. (v).   
Corporate Plan 
1.2 This section sets out how the proposals relate to the achievement of the
Council’s Corporate Plan Objectives: 
(i) Giving every child the best start in life;
(ii) Developing educated, responsible and informed citizens;
(iii) Promoting a prosperous, inclusive and sustainable economy;
(iv) Supporting people to lead independent, healthy and active lives; and
(v) Creating a safe and sustainable place for future generations. 
This report relates to Objective No. (v).  
Page 164 of 250

Page 165

1.3 The report also links to the Education & Children’s Services Vision, Values
and Priorities in respect of the following key priority area: 
• Safe and Protected 
2. Resource Implications 
Financial 
2.1 This report contains no proposals which would have a financial impact on the
Council.  All relevant areas of work pertinent to CJSW will be taken forward
within budget. 
Workforce 
2.2 There are no workforce implications arising from this report. 
Asset Management (land, property, IT) 
2.3 There are no asset management implications arising from this report. 
3. Assessments 
Equality Impact Assessment 
3.1  Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.1.1 The proposals have been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome:
(i) Assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.2.1 The proposals have been considered under the Environmental Assessment
(Scotland) Act 2005.  However, no action is required as the Act does not apply
to the matters presented in this report.  This is because the Committee are
requested to note the contents of the report only and the Committee are not
being requested to approve, adopt or agree to an action or to set the
framework for future decisions. 
Sustainability 
Page 165 of 250

Page 166

3.3 Under the provisions of the Local Government in Scotland Act 2003, the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.  Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• In the way best calculated to delivery of the Act’s emissions reduction
targets.
• In the way best calculated to deliver any statutory adaption programmes.
• In a way that it considers most sustainable. 
3.3.1 There are no issues in respect of sustainability from the proposals in this
report. 
Legal and Governance 
3.4 This report contains no proposals which would have a legal or governance
impact on the Council. 
3.5 N/A. 
Risk 
3.6 There are no issues in respect of risk from the proposals in this report. 
4. Consultation 
Internal 
4.1 None. 
External 
4.2 None. 
5. Communication 
5.1 There are no communication issues in respect of the proposals in this report. 
2. BACKGROUND PAPERS 
2.1 The following background papers, as defined by Section 50D of the Local
Government (Scotland) Act 1973 (and not containing confidential or exempt
information) were relied on to a material extent in preparing the above report: 
The Community Justice (Scotland) Act 2016 
3. APPENDICES 
3.1 Appendix 1 - PKJC&SP Annual Outcome Activity Return 2021-22 
Appendix 2 - Glossary of Terms
Page 166 of 250

Page 167

Page 1 of 55 
September 2022  
CJ Scotland
Ceartas Coimhearsnachd Alba 
CJ Outcome Activity Across Scotland
Local Area Annual Return Template Guidance
2021-22 
8
Page 167 of 250

Page 168

Page 2 of 55
1) CJ Partnership
/ Group Details 
Name of local
authority area/s
Perth and Kinross
Name and contact
detail of the
partnership Chair
Name: Bailie Chris Ahern
Email: CAhern@pkc.gov.uk
Telephone: 07767222496
Contact for queries
about this report
Name: Eleanor Lindsay
Email: elindsay@pkc.gov.uk
Telephone: 07786856960 
2) Template Sign-off from CJ Partnership / Group Chair 
Date:  26 September 2022 
Name:               
Page 168 of 250

Page 169

Page 3 of 55
3) Governance Arrangements
Describe your current governance structure for CJ arrangements and include links to
wider community planning. 
Page 169 of 250

Page 170

Page 4 of 55
4) Progress From 2020-21 Recommendations 
These recommendations were published at the end of the reporting year and
concern 3rd sector engagement, futures planning, and compliance with the CJ
(Scotland) Act 2016. Please detail what work partners have undertaken, or
intend to undertake, in response to the following 2020-21 recommendations: 
Recommendation 1: Partnerships should build on work undertaken within the
reporting period relating to third sector identification and engagement, and apply
lessons learned to ensure they have established mechanisms to identify and engage
with victim organisations as well.
a) What local strengths or recent progress relates to recommendation 1?
The Third Sector Forum within Perth and Kinross (PK) stopped meeting during 2021-
22 due to other priorities linked to COVID-19.  Perth and Kinross Association of
Voluntary Service (PKAVS) and the Community Justice (CJ) Partnership Co-
ordinator hosted an online Third Sector Forum session (March 2022):
• It was acknowledged that the Third Sector Forum had not met for a significant
period, however, there was agreed appetite from those in attendance to re-
establish Third Sector Forum and expand the membership. 
• It was agreed that a review of Third Sector Forum Membership was required and
a scoping exercise to identify local Third Sector organisations (including victim
organisations) CJ focussed and those on the periphery).    To achieve this, there
was agreement that this required further clarity.  For example, – “What is CJ” to
assist organisations to understand the relevance of participating in the forum.    
• The purpose and remit of the Third Sector Forum was agreed – opportunity for
third sector partners to come together/ relationship building, share experience/
share learning, support partners to meet shared objectives, offer opportunities for
collaboration, provide an opportunity for collective thinking.
• Agreed appetite for CJ and Safety Partnership co-ordinators to attend the forum
and update on the national landscape.  
• It was recognised that the forum will provide opportunity for the Third Sector to
have greater input into the CJ Scotland Annual Return.   
A further Third Sector Forum session was held June 2022 with wider Third Sector
attendance.  Terms of reference and format / frequency of meetings agreed. 
Development session agreed (held September), three questions explored:   
1. What do people on the Justice Journey need from the Third Sector? 
2. What does the Third Sector in P&K deliver currently?  
3. What are the gaps?   
The work to re-establish the Third Sector forum has been welcomed by Third Sector
Partners.  One organisation commented “the planned approach will definitely help
to move things forward with regards to third sector and statutory as a whole”. 
Page 170 of 250

Page 171

Page 5 of 55
4) Progress From 2020-21 Recommendations 
Recommendation 3: Partnerships should undertake (or evidence the work
already undertaken) to understand the future need and demand on their services:
in particular, but not constrained to, recovery from the pandemic.
b) What gaps or emerging changes in need and demand for services have
been identified? 
c) How has this been identified?
The Partnership hosted two online events during January and February 2022
whereby attendees explored the future need and demand on services.   
• Session One - What’s on the horizon for Justice and Safety; Self-identification of
Partnership Strengths; Self-identification of Gaps; Priorities and Demands.  
• Session Two – The approach – how the Partnership will meet the above. 
Following session one, the Partnership were asked to rate the priorities.  The CJ,
and the Community Safety Co-ordinator used the information to identify the Action
Delivery Priorities for 2022-23.  The three priorities identified were: Substance Use;
Violence Against Women; and Reducing Reoffending.  An Action Delivery Plan for
2022-23 was drafted and approved by the Partnership in April 2022.  The Action
Delivery Plan is available to the public on the CJ and Safety Partnership website . 
A similar illustration will be created following the Third Sector Forum discussion held
in August 2022.  A final, lived experience, discussion/illustration is being considered.  
Page 171 of 250

Page 172

Page 6 of 55
4) Progress From 2020-21 Recommendations 
d) How will partners respond? 
e) What has restricted progress in this recommendation? 
The management of multiple completing priorities has slowed progress in this area. 
Some examples include responding to numerous consultations (Bail and Release,
National Care Service, National Strategy for CJ x 2) and attending meetings linked to
the new National Strategy for CJ and Outcome Performance Improvement
Framework (OPIF).
COVID-19 recovery also hampered progress, an additional layer of complexity to
working collaboratively.   Service provision was more limited during the reporting
period due to COVID-19 mitigations and delivery of frontline service was prioritised,
albeit at a reduced level.  
Recommendation 4: Partners should note their collective statutory responsibilities
under the Act to ensure that:
• all partners are aware of the statutory obligations, and that clarity and agreement
is sought over partner expectations and contribution to ensuring these are met
• all national partners understand and comply with their individual responsibilities to
supporting partnerships achieve their aims (section 35)
Page 172 of 250

Page 173

Page 7 of 55
4) Progress From 2020-21 Recommendations 
f) What work has been undertaken or planned to make improvements
against recommendation 4?
Terms of Reference (ToR) reviewed/amalgamated (CJ and Community Safety)
following the mergers of the two Partnerships. 
g) What did this achieve? 
The development of the amalgamated ToR provided the Partnership with a shared
sense of purpose and shared understanding of the governance structure.
h) In what ways did local partnership compliance to the CJ (Scotland) Act
2016 change during 2020/21?
CJ Outcome Improvement Plan (CJOIP) - PK CJ Partnership launched a CJOIP in
2017, a three-year plan outlining Partnership priorities aligned to the National
Strategy for CJ and the associated OPIF. The CJOIP was due to be renewed in
2020, however, extend for one year to allow focus to be given to the COVID-19
response. It was the Partnership’s intention to launch a new CJOIP in 2022. With
continuing COVID-19 demands, and a new National Strategy for CJ due to be
launched in 2022, the launch of the new CJOIP was postponed to 2023.  Meantime,
the Partnership published an Action Delivery Plan, outlining priorities for 2022-23
and holding statement, both of which are available on the Partnership webpage. 
Participation Statement - The Partnership’s current Participation Statement ,
available on the Partnership webpage, was developed in relation to the 2017 CJOIP.   
New CJOIP (2023) planning
• Planning in progress for new CJOIP – creation of infographics has been an
important starting point
• Strategic Needs and Strengths Assessments (SNSA) planned for Diversion from
Prosecution, Bail Supervision, Prisoner Release and Arrest Referral.
• The new CJOIP will be informed by the above-mentioned infographics, SNSAs,
the National Strategy for CJ new OPIF and stakeholder engagement.   
Outcome Activity Annual Return - PK Outcome Activity Annual Returns from 2017
to 2021, available on the CJ section of the Partnership’s webpage, outline progress
toward national and local outcomes. 
Duty of cooperation - Section 4d (above) highlights the PK CJ&SP approach, duty
of co-operation is integral to this approach.  During the reporting period the CJ
Partnership and the Community Safety Partnership merged improving the sharing of
information and reducing duplication for partners.  Membership was reviewed during
the reporting period and extended to include a wider representation. The work
undertaken has enhanced collaboration, reduced duplication and better prioritises
resources.  
Page 173 of 250

Page 174

Page 8 of 55 
5) Covid-19 Pandemic Impact
The pandemic continued in 2021-22. This section should be
used to reflect some of the a) challenges/negative implications
and b) opportunities/positive implications from the Covid-19
pandemic on the CJ partnership. This can include impact on
the improvement activity, partner collaboration, delivery of
services.  
Challenges / Negatives Positives / Opportunities
• Ongoing COVID-19 restrictions continued to present
challenges.  Routine testing, short notice staff absence and
suspension of non-essential face to face work (end 2021/
start 2022) resulted in a stop start of activities, beyond the
delivery of frontline services, across the Partnership.
• Groups that had previously been suspended were able to
restart but numbers were restricted.  
• Ongoing impact of COVID-19 on prison visits and on
families.  I.e., it was difficult for Cross Reach staff to
maintain contact with families ordinarily seen on a regular
basis.  Families Outside identified that families were having
difficulty/concerns regarding the following during the
reporting period: finding information; lack of clarity
regarding potential criteria for early release and the support
for families; concerns about suspension of home leave,
parole processes, and delay in social work reports.
• Reduced capacity of support services continued to impact
waiting times for services generally, for example impacting
on response to Domestic Abuse.
• Lack of an integrated pathway for people accessing
services and lack of treatment/intervention choice e.g.,
Opiate Substitution Therapy (OST), detox, rehab,
psychological support, mental health interventions.
• Prisoner release – continuation of regular meetings.
• Technology enabling work to continue and improving
opportunities to attend training and meet (e.g., Cross Reach
children’s worker provided on-line play sessions). 
• Families Outside and Tayside Council on Alcohol (TCA),
two of many organisations/ teams who adopted a blended
delivery approach in recognition that virtual communication
methods can enhance engagement opportunities for some.
• COVID-19 restrictions made working collaboratively
essential. Collaborative working relationships formed during
lockdowns have been sustained.  One example, Hillcrest
Futures worked with Integrated Drug and Alcohol Recovery
Team (IDART) to deliver prescriptions to those who were
isolating within PK.  This support has continued, Hillcrest
Futures continue to support with OST delivery two days a
week. Another example of relationships translating into
enhanced service delivery is Hillcrest Futures and CATH
weekly drop-in.  
• “OD not Me” harm reduction campaign and distribution of
naloxone during assertive outreach – during and post
COVID-19 restrictions. 
• Success of assertive outreach in helping to maintain
contact with vulnerable people during covid lockdown.
Page 174 of 250

Page 175

Page 9 of 55 
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
NATIONAL OUTCOME ONE 
Communities improve their understanding and participation
in CJ
With regard to the following indicators: 
➢ Activities carried out to engage with ‘communities’ as
well as other relevant constituencies
➢ Consultation with communities as part of CJ planning
and service provision
➢ Participation in CJ, such as co-production and joint
delivery
➢ Level of community awareness of / satisfaction with
work undertaken as part of a CPO
➢ Evidence from questions to be used in local surveys /
citizens’ panels and so on 
➢ Perceptions of the local crime data
New activities: What new activities in 2021-22 were driven /
undertaken collectively by the CJ partners/hip in relation to
outcome one? 
What was the impact of these activities?
• The Partnership hosted two online events (operational
discussions) during January and February 2022, whereby
attendees explored the future need and demand on services.  
More detail provided in the recommendations section above
(4c).  These events were a new approach taken by the
Partnership.  The was representation from statutory partners
and PKAVS (representing the Third Sector).   
• Criminal Justice Social Work (CJSW) Survey – Justice Journey
and Substance Misuse.  Snapshot survey/audit competed by
• Feedback to date has been positive with people
commenting that the infographic provides a user friendly
visual of the complex CJ and Safety landscape.  The two-
page document also lends itself to remaining relevant and
accessible, in a way a lengthy document might not. 
Partner organisations are displaying posters of both
graphics and they are available also as a Microsoft Teams
background.   
• Data capture used to inform engagement with Alcohol and
Drug Partnership (ADP) and IDART.  Outcome – the
Page 175 of 250

Page 176

Page 10 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
CJSW staff to collate prevalence of substance (alcohol and
drug) use among client group.   
• Preparatory work to restart the Third Sector Forum and plans
to hold Third Sector Forum Development session (August
2022) outlined in 4 (a) above. 
• Cross Reach started working in partnership with NHS Tayside
Hospital Shop who are providing information on well-being &
mental health for families supported by Crossreach.   Work is
underway to have QR codes available to make self-help and
self-referral information easily accessible. 
Cross Reach will be hosting an Intern from Dundee University
who will look at the effects of trauma & engagement (work
commencing September 2022).  
services worked collaboratively to draw up plans for a
Specified Person pilot with the intention of improving the
quality of service for people on the justice journey. 
• Appetite amongst Third Sector to participate in Third
Sector Forum established.   
• Unable to comment on impact due to work being in early
stages. 
• Permission will be requested to share the completed
dissertation with the PK CJ Co-ordinator.     
What ongoing activities took place in relation to outcome
one?
What was the impact of these activities?
The changed approach of Community Safety Partners (outlined in
previous Annual Returns) within PK continued during 2021-22, a
focus on ‘protecting those most vulnerable in society from those
most likely to harm them’ and an emphasis on risk management,
inclusion, reducing inequality, engagement and most importantly,
prevention. 
Emerging trends are identified and tracked via a fortnightly
multi-agency Anti-Social Behaviour meeting and ownership of
issues may be passed to Short Life Working Groups led by
the relevant partner. These groups develop multi agency
action plans which share skills and resources to tackle issues
as early as possible to improve efficiency and effectiveness of
response and promote public confidence and trust.   
Page 176 of 250

Page 177

Page 11 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Within PK, Police Scotland and Community Wardens continue to
work together to actively engage with local elected members and
Community Groups to help communities understand the realities of
crime. This work was complimented by the work of the Safer
Communities Team (SCT) which includes Police Officers from the
Partnerships Interventions and Preventions (PIP) team who are a
key part of the multi-agency problem solving approach in PK.
Issues and concerns are raised at the Police Tasking Meeting held
each morning and these are allocated to the Police Hub for action.
These include:
• High and medium risk repeat missing people
• Vulnerable people
• Dangerous people
• Trends in anti-social behaviour and crime
• Environmental issues 
• Updates on current complex cases 
• Non-fatal overdoses 
PKC’s Unpaid Work Team (UWT) continue to utilise several media
channels to publicise the work of the team and encourage local
communities to engage with them and to share positive feedback.
This engagement activity includes: 
• News from Westbank – This e-newsletter was issued six
times during 2021-22, a reduced frequency due to other
work priorities.  The newsletter provides updates on all four
projects that form part of the Westbank Hub: Community
The fortnightly tasking meetings were replaced during the
reporting period with two monthly locality-based tasking
groups (each locality group meets two monthly) chaired by the
SCT.  These groups are split to cover Blairgowrie & East
Perthshire; Highland Perthshire; South Perthshire & Kinross-
shire; Letham, Tulloch & Fairfield and Perth City and Scone. 
Agencies represented include SCT, Housing providers, Police
Scotland, Child Protection SW, I-DART, Waste Management
and Community Wardens. Each group meet to discuss issues
and ensure good joint working practices. 
As a result of the various communication streams outlined
above, PKC’s UWT received 273 requests for work to be
carried out during 2021-22, a significant increase on 72
requests received during 2020-21.  The total number of
requests remained lower than the 355 received 2019-20.  This
is entirely attributable to COVID restrictions. 
Page 177 of 250

Page 178

Page 12 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Payback; Westbank Project; Perth Community Farm and
Community Greenspace. 
• The Westbank Project Facebook page – The page contains
short news stories and photographs of pieces of work
undertaken by the teams based at the Hub. 
• Unpaid Work Website page - As part of the PKC website,
the UWT’s page includes a function that allows members of
the community to submit requests for pieces of work to be
undertaken by the UWT. 
One of the key aims of the Unpaid Work Team is to
help individuals to learn new skills so that they have improved
opportunities for employment in the future whilst undertaking work
that benefits communities. 
Some specific examples for the projects undertaken include:
• The UWT cleared parts of the Regional Route 83 (between
Dunkeld to Ballinluig) which had become overgrown or
narrow due to encroaching grass and consequently was
becoming unusable. The Route is now fully open and is a
lovely area to explore.
• The UWT supported the repair and re-decoration of a flat.
The flat was transformed - with fresh coats of paint and a
new colour scheme.  The work enabled a young family
member to return home from Foster Care.
• The UWT undertook maintenance work in the grounds of
Tenandry Kirk (near Pitlochry).  Gates and railings were
re-painted, and the various outdoor benches required
some refurbishment works.  The refurbishment work was
welcomed by both locals and walkers.   
The UWT spent a considerable amount of time in the
Westbank Joinery over the winter months, building four picnic
tables and three large planters to gift to Blair Atholl Primary
School. People giving back via CPOs have the opportunity to
learn new skills.  The work completed will provide additional
multi-purpose outdoor seating for the pupils at Blair Atholl
Primary School and also further pupils interest in horticulture. 
Some examples of the positive feedback received include:
• “The Housing and Social Wellbeing Committee
thanked the above for all their hard work and urged
Page 178 of 250

Page 179

Page 13 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
An example of joint delivery includes partnership working between
One-Stop Women’s Learning Service (OWLS) and other services
including Independent Advocacy Service, Barnardo’s, Rape and
Sexual Abuse Centre (RASAC) and TCA. The services work
collaboratively together: OWLS continue to extend invitations to
their team meetings where they share their knowledge of services
and resources and have offered space and time in the OWLS
facility to support individuals, whilst promoting safe and healthy
practice.  Additionally, OWLS and TCA continue to jointly manage
a member of staff who is employed through TCA but based full
time in OWLS (TCA OWLS Mentor engages and supports women
every member to get in touch for help” (Housing and
Wellbeing Committee) 
• “I just wanted to say thank you so much for arranging
for the woodchip to be delivered. The team were
brilliant, they sorted out one of our planters and filled
the raised areas with plenty woodchip and they did it
all with barrows and spades! They couldn’t have been
more helpful. We really appreciate it so thank you”
(Letham Early Childhood Centre) 
• “What can I say other than thank you!!!! What a job
that’s been done by the team I can’t thank you enough
for this.  I visited properties today and was blown away
by the difference that has been made. Please pass on
my thanks top every single person that was involved”
(Member of the public). 
The co-production and joint delivery of services improves
access opportunities to services for women.  The whole
system approach enables needs to be met at a the time the
person is able to accept the support.
• “Staff was flexible with my appointments which really
helped me, they helped with practical and emotional
support, couldn’t have done it without you”. 
Page 179 of 250

Page 180

Page 14 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
coming through the OWLS service).   TCA counsellors also offer
sessions to women within OWLS premises wishing to access the
service.   
OWLS participate in a range of community engagement activities. 
One example is annual MacMillan Coffee morning. Due to ongoing
COVID-19 restrictions OWLS hosted a cake stall outside St
Martin’s House, OWLS staff and colleagues contributed their time
and donated ingredients to bake various delicious goodies to be
sold including cheesecakes, truffles, caramel shortbread and
tablet.  OWLS worked in collaboration with environmental
services/Unpaid Work Team, who assisted in setting up the stall.   
The ‘Evolve’ men’s project continues to work from the Neuk, a
local mental health hub, which has provided opportunities to work
collaboratively with local mental health services.  For example,
sharing access to counselling volunteers, and introducing men to
the 24-hour support that is available within the Neuk.  The service
continues to explore connections with other local third sector
agencies, such as TCA, and Andy’s Man Club, to inform the work
undertaken, and to provide a wide range of supports to service
users. 
The service has been piloting the use of ‘Wellbeing Wheels’, an
interactive tool which allows the person and the worker to visually
see progress over time. The wheels are used as a therapeutic tool 
Staff and members of the public were very generous with their
purchases and donations. Women helped with preparation
and the stall, empowering women to give time to a good
cause. 
During the reporting period, group work restarted (when
COVID-19 restrictions allowed). Although COVID -19
restrictions resulted in a reduction in numbers, feedback from
the group was positive, with the men finding the support of
their peers invaluable.  The service continues to work with
men in a trauma informed manner, using a combination of
intensive one to one work, and a focussed programme of
group work which will include activities designed to increase
positive life chances and pro-social decision making for males
who offend, to help them find purpose, improve their wellbeing
and rebuild relationships within their communities and
families. 
Impact of the wheels is not yet known as they are in early
stages of testing.   
Page 180 of 250

Page 181

Page 15 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
to explore areas of strength and areas for growth, both targeting
known criminogenic needs, and areas of concern identified by and
unique to the service user. They are then used throughout the
review process to measure progress, in a visual way which is
immediately understandable, promotes hope and encourages a
focus on finding solutions. 
Existing partnerships, such as those targeting the engagement and
delivery of support to young people transitioning to adult services
have been positive in streamlining the multi-agency role,
enhancing the multi-agency approach.   
Other multiagency partnership examples include:
• Pupil Engagement officer in Perth Grammar 
• SCYD Blairgowrie 
• Alyth Youth Partnership
• SDS - targeted service offer to young people transitioning
from school to post school supporting with developing their
Career management skills
have been invaluable and led to plans such as co-facilitation with
RASAC, Summer programmes for Peer Education, Drumhar
connections within the Hillcrest Futures Harm Reduction service
etc.   
Hillcrest Futures, like many supports within PK, continue to work to
break down barriers to accessing support and they have done this
using blended model of support during 2021-22.  Social media
remains an added layer of resource and supports accessibility to 
Increased engagement and targeted delivery to young people
transitioning from young peoples to adult services. This
partnership has also to opportunities such as co-facilitating a
Perth City wide education programme with Perth and Kinross
Council Youth Engagement Team. 
This blended model improves accessibility and flexibility
services engage.  For examples, accessing supports virtually
makes services more accessible for those who find it difficult
to leave their home. 
Page 181 of 250

Page 182

Page 16 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
both local services and people requiring support. Having a variety
of platforms alleviate some of the access barriers, particularly
useful large geographic area like PK. 
The activity outlined above may go some way to influencing
local perceptions of crime.  Unfortunately, statistical data was
not available for the reporting period.  Most recent data 2019
(77% of PK residents surveyed perceived crime to be about
the same or a little or a lot less, compared with the Scottish
national average of 75.5% (Scottish Crime and Justice Survey
Perceptions of Local Crime (Scottish Surveys Core
Questions)).  2020-21 data was not available at the time of
writing.
NATIONAL OUTCOME TWO
Partners plan and deliver services in a more strategic and
collaborative way
Where applicable have regard to the following indicators. 
➢ Services are planned for and delivered in a strategic
and collaborative way 
➢ Partners have leveraged resources for CJ
➢ Development of CJ workforce to work effectively across
organisational/professional /geographical boundaries 
Partners illustrate effective engagement and collaborative
partnership working with the authorities responsible for the
delivery of MAPPA
What new activities in 2021-22 were driven / undertaken
collectively by the CJ partners/hip in relation to outcome two?
What was the impact of these activities?
CJ and Safety Partnership Merger - During the reporting period
the CJ Partnership and the Community Safety Partnership merged
improving the sharing of information and reducing duplication for
partners.  Partnership membership was reviewed during the
The merger of the Partnerships has improved time
management and resulted in less duplication, especially
through discussion of interlinked issues. 
Page 182 of 250

Page 183

Page 17 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
reporting period and extended to include a wider pool of
attendance.  For example, partnership membership was extended
to the ADP co-ordinator. 
Arrest Referral - Preparatory work took place during 2021-22 for
the launch of a two-year Arrest Referral pilot via Positive Steps
(Charity).  The purpose of the pilot is to connect people with
support at the earliest opportunity.  The preparatory work was
undertaken by the CJ&SP, and the ADP.  PK joined the existing
Dundee City Arrest Referral pilot alongside Angus Council
(leveraged resources across Tayside) with Police Scotland also
contributing to the pilot.  The CJ&SP and ADP hosted a one-day
induction for Positive Steps Arrest Referral staff (May 2022)
providing introductions to SCT, IDART and the Neuk in an effort to
breakdown organisational barriers for the benefit of PK Residents.   
• Leadership within the partnership is good and has
improved with the joining of the partnership. 
• Duplication of reporting and meetings has been
reduced.
• The partnership has wider influence through increased
membership.  
• Understanding of shared resources available in CJ and
CS has improved. 
The induction helped Positive Steps staff to gain an
understanding of the working of the Partnership, services
available and an opportunity to feel part/connected to the
Partnership.  “As the launch of the CARS (Arrest Referral)
project was approaching we were invited to attend an
Induction Day in Perth with the Criminal Justice team…
along with meeting the different services available within
Perth.  This allowed a greater insight into the services we
would be offering to individuals within the cells and for
our own knowledge as to the different roles that everyone
played within the Criminal Justice/Drug treatment teams. 
We feel that meeting everyone in person and seeing
directly what part they played within the service broke
down barriers between the service and allows for a better
working practice” (Positive Steps). 
CARS (Arrest Referral) launched on 1 July 2022.  Impact
evidence for the reporting period is not available.   
Page 183 of 250

Page 184

Page 18 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Complex Needs Co-ordinator Pilot - Preparatory work took place
during 2021-22 for the creation of a Complex Needs Co-ordinator
post (pilot) based on long standing concern about a small but
significant number of men and women in PK who have complex
needs and have a high risk of: Homelessness, Drug Deaths,
Offending, Imprisonment, Exploitation by Serious Organised Crime
Groups, Domestic Abuse, Poor Mental Health, Self-harm, and
suicide.  In recent years a number of drivers have emerged: Hard
Edges Scotland; Drug Death Emergency; NHS Tayside Mental
Health Report; Drug and Alcohol Report about Tayside.  The
Complex Needs Co-ordinator pilot is a collaborative pilot CJ&SP
and ADP. 
Specified Person Pilot - Preparatory work took place in 2021-22
leading to recommendation of Specified Person pilot.  Tackling
drug deaths and reducing non-fatal overdose are key local and
national priorities, along with providing rapid access to support and
treatment.  An evaluation of Drug and Alcohol Treatment
Requirements was undertaken by the CJSW following a meeting
with the PK Sheriffs and identification of a disconnect between
Sheriff’s expectations and the delivery of Drug and Alcohol
Treatment Requirements locally.  The evaluation highlighted room
for improvement in the delivery of Drug and Alcohol Treatment
Requirements within PK.  The Specified Person (as outlined in
legislation and guidance) is absent from existing internal
processes, and it was identified that the role could not be fulfilled
by the CJSW without providing a large amount of training, and
without significant resource difficulties. 
Interviews for the post were held July 2022 with the
successful candidate starting in September 2022.  Impact
evidence for the reporting period is not available.   
The Specified Person pilot is still in the planning stage. 
Evidence of impact, for the reporting period, is not available.  
Funding of the posts was delayed due to changes in Scottish
Government funding to ADPs.  The pilot of the posts is
considered necessary by both CJ&SP and ADP.  This will be
another example of leveraged ADP and Criminal Justice
resources.   
Page 184 of 250

Page 185

Page 19 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
The evaluation findings were shared with the ADP and through
discussion the following pilot was recommended:
• Employment of three Specified Persons (workers) for the
duration of the pilot (two years).   
• The Specified Persons will lead the engagement with
regards to substance misuse issues, and any social issues
which interconnect.  CJSW involvement will vary, working in
the background when substance misuse is the sole issue,
but undertaking specified offence focused work where
required. 
• Development of an outcome measurement tool required and
will be developed (CJSW and I-DART). 
Preparatory work to relaunch Third Sector Forum - See
Recommendations section 4(a) for more details. 
The relaunch of the Forum did not take place until March
2022.  Impact evidence for the reporting period is not
available.  However, early feedback has been promising with
some partners commenting on feeling more connected to the
Partnership.  
What ongoing activities took place in relation to outcome
two?
What was the impact of these activities? 
An example of services being planned for and delivered in a
strategic and collaborative way is highlighted in the involvement
and involvement of the Scottish Fire and Rescue Service (SFRS)
in the CJ&SP.  Senior management within SFRS are active
partners of the CJ&SP.  
• Safer Communities Wardens based at Perth Community
Fire Station (co-location).  
• Commitment from SFRS to support Multi Agency Risk
Assessment Conference (MARAC) meetings in PK.  Whilst
Close working links promote the sharing of information and
partnership working across PK and supports the provision of a
responsive service to the PK public 
The SFRS example is one of many that could be provided
highlighting the active partnership planning and delivery. 
Other similar examples include:
Page 185 of 250

Page 186

Page 20 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
SFRS do not physically attend MARAC meetings, the
service feed into the monthly meetings, interventions with
persons noted are passed on as per the toolkit process.   In
addition to supporting MARAC, SFRS also work closely with
Perthshire Women’s Aid, Barnardo's, and support gender-
based violence activity within PK.
• Collaborative working SFRS and Criminal Justice Service
for Joint Home Safety Visits for vulnerable users.
• Collaborative work with SCT and SFRS regarding youth
engagement with schools and groups for non-engaging
youths.
• SFRS participate in Inter-Agency Referral Discussions and
Case Conferences as appropriate.
• SFRS participate in the weekly Protecting People Group. 
Examples of partnership working /workforce development which
cut across a variety of boundaries are: 
1. CJSW, Housing Service and Police Scotland continue to work
proactively together sharing professional expertise.  
2. PKC’s Housing Service continue to work closely with SCT to
rehouse, where appropriate, the perpetrator of domestic
abuse. The Housing Service also continues to work with other
agencies through the Violence Against Women Partnership
(VAWP) and participates in weekly meetings to discuss cases
and take joint actions as required.
3. Continued close working links between SCT, Police Scotland
and the UWT, again sharing expertise and learning from other
professional disciplines.  This supports good working
relationships where partners actively support each other.  An
• The co-location of CJSW, SCT and Police Scotland at
St Martin’s House enhancing the delivery of services to
the PK public.  
• Multi agency attendance and engagement – Prisoner
Release meetings, enhancing the delivery of services
to the PK residents leaving prison. 
This partnership approach and shared partnership vision
supports successful rehabilitation through the provision of
settled accommodation and support, reducing the risk of
reoffending and helps create safe and sustainable
communities. 
“Following a playpark and wooded area patrol I spoke
with the Westbank Community Payback team.  The team
cleaned up, and opened up, the wooded area that the
Page 186 of 250

Page 187

Page 21 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
example of this, during the 2021-22 reporting period, is the
response to concerns/reports regarding a wooded area being
utilised by youths, litter building and the area looking
unattractive.  The UWT were contacted and undertook clean
up activity.     
Within Tayside, CJSW, Police, Scottish Prison Service (SPS) and
Health (NHS Tayside), continued to work collaboratively to prevent
people becoming victims of serious harm. Making Tayside
communities safer is the highest priority of the collaborative, and
work undertaken through Multi Agency Public Protection
Arrangements (MAPPA) is of critical importance to achieving this. 
Although the most recent Tayside MAPPA Annual Report Annual
Report covers the period 2020-21 and the disruption linked to
COVID-19 lockdowns the Tayside MAPPA group were able to
make continued progress through engagement and collaboration
by the group.  The 2020-21 MAPPA Annual Report was presented
to the CJ&SP by the Criminal Justice Service Manager on
publication.   
youths were using, removing two bags of rubbish, some
drug paraphernalia, cracking job” (Community Warden) 
The collaborative working arrangement allowed the following
achievements despite the disruption:
• The Strategic Oversight Group (SOG) met 6-weekly to
ensure agencies were coping and that there are no
gaps in the MAPPA arrangements. This was
strengthened by the Risk Register produced at the start
of the pandemic and presented the Chief Officers
Groups in each of the three local authorities. The risk
register was reviewed at each SOG and the probability,
impact and risk ratings are scrutinised. 
• Implement the Strategic Plan including outstanding
actions identified from Significant Case Reviews. The
development of a Case Review group chaired by the
SOG chair ensured that all actions from Significant
Case Reviews are examined and evidenced in
practice. This group examined both Person X and
Prisoner Z action plans and worked to ensure that all
actions were completed and to become standard
practice in each agency. 
• The MAPPA Management Group gained oversight of
the training plan and all future training. Delivery of
training was difficult during 2020-21, however the
Page 187 of 250

Page 188

Page 22 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
agencies took comfort in the existing personnel within
the areas of MAPPA all being trained in the accredited
risk assessment tools.
• Planning for the development of a communication plan
took place.  The work will commence 2021-22.  
• The Self Evaluation and Audit Working Group was
established to implement a self-evaluation regime for
the examination of inter-agency working to encourage
and develop self-evaluation which assesses impact
and outcomes in line with the MAPPA Quality
Indicators. The Group also developed a Tayside
MAPPA Performance Report to provide management
information and statistics on MAPPA and the wider
work to both the MAPPA SOG and MAPPA Operational
Group (MOG).
NATIONAL OUTCOME THREE
People have better access to the services that they require,
including welfare, health and wellbeing, housing and employability
Where applicable have regard to the following indicators. 
➢ Partners have identified and are overcoming structural
barriers for people accessing services
➢ Existence of joint-working arrangements such as
processes / protocols to ensure access to services to
address underlying needs
➢ Initiatives to facilitate access to services 
➢ Speed of access to mental health services 
➢ % of people released from a custodial sentence:
a) registered with a GP 
b) have suitable accommodation 
c) have had a benefits eligibility check 
Page 188 of 250

Page 189

Page 23 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
➢ Targeted interventions have been tailored for and with
an individual and had a successful impact on their risk
of further offending
What new activities in 2021-22 were driven collectively by the
CJ partnership in relation to outcome three?
What was the impact of these activities?
Arrest Referral – see text provided under outcome 2. 
Services Available for Prisoners on Release (Voluntary
Throughcare) multi agency working group (Scottish Prison
Service, ADP, SCT, Skills Development Scotland, Families
Outside, New Routes, Justice Healthcare and Mental Health).  The
working group is taking a whole system approach to prisoner
release (working group launch February 2022).  Action delivery
plan developed.  Priorities – improve co-ordination and support
prisoners on release; embed SHORE standards; improve
employment opportunities/positive destinations, seamless access
to substance services; provision of wrap around support; support
available to families; information available to prisoners (prisoner
release packs); access to mental health services.   
Complex Needs Co-ordinator – see text provided under outcome
2.  The complex needs co-ordinator will utilise trend information
from both Arrest Referral and Prisoner Release to direct activity to
facilitate timeous access to services.   
Specified Person – see text provided under national outcome 2.
All the activities described in this section are either in their
infancy or still to be launched, it is therefore not possible to
comment on the impact of the activities.   
What ongoing activities took place in relation to outcome
three?
What was the impact of these activities?
Page 189 of 250

Page 190

Page 24 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
The following examples highlight partners work in lessening the
structural barriers for people accessing services. 
The following provides an example of the integrated support
offered to women via OWLS, making services more accessible: 
• Tayside Council on Alcohol (TCA) Mentor
TCA continue to be commissioned to provide a Mentor within
OWLS who delivers a peer mentor programme and community-
based activities. TCA, employ a variety of approaches to enable
mentees to access services and support women to integrate back
into the community.  This can be supporting women to leave the
house, engage in health & wellbeing activities through walking,
actively looking for voluntary work or employment.  These include: 
o Acting as advocates allowing individuals to access services. 
o Support to move home/settle into new home/community.
o Support into the workplace.
o Using cars to remove distance as a barrier.
o Accompanying individuals to meetings.
o Making phone calls on behalf of people to reduce anxiety. 
o Undertaking research on behalf of people to inform about
services.
o Acting as a “buffer” between the person and services e.g.,
accompanying a person who was considered violent to a Job
Centre appointment.
o Providing references for UCAS applications to allow women to
access higher education. 
• Independent Advocacy 
This example demonstrates that specialist services enhance
women and children’s rights, enabling services to better
support people to achieve better outcomes.
“When I look at myself, I can see that I am a million miles
away from the once struggling, chaotic woman I was
when I first walked through those doors at OWLS….  I
want to thank you for always being there for me, believing
in me, continuing to support me and never giving up on
me no matter what. I appreciate that my journey has not
been easy for any of us but with your help you got me
there and I hope you will see the difference you have
made. You are both such wonderful women and what you
do for women like me is truly amazing. I will never be able
to thank you enough”. 
Page 190 of 250

Page 191

Page 25 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Independent Advocacy Service has provided invaluable support to
the women and staff, both in terms of collaborative work and
keeping staff up to date with new services.  Working across UK
boundaries to ensure the rights of women and children are kept as
a priority and to ensure every child has their needs met.   
Examples of other services offering support onsite within OWLS:
• I-DART continue to provide a clinic fortnightly.   
• Staff from the Blood Borne Virus (BBV) clinic continue to
deliver staff training and offer women Naloxone training.
• Women’s Aid have a space to meet women, as required, to
provide a safe space for women to discuss safety plans and
explore their options around relationships.
• RASAC support OWLS staff (via training) to deliver more
trauma informed work.   
Multi-Agency Referral Hub – the aim of the referral hub is to link
individuals with the most appropriate service in a timely manner
(first time around).  The Referral Hub, attended by a range of
agencies including IDART, Hillcrest Futures and TCA, meets daily
(Monday to Friday) to triage referrals, consider individual needs,
type of substance and expressed wishes (e.g., some individuals
may request a specific type of support).   Referrals are now
received via telephone (including from the Access Team and GPs)
via duty workers from the participating organisations.   
An example of the impact of this is a woman being supported
to attend virtual courts, using IT equipment within OWLS.   
Impact – barriers to accessing services are reduced. 
The multi-agency referral hub continues to support joint
working episodes among the agencies involved where one
agency may lead, with another providing additional layers of
support.  The system enables referrals to be received and
reviewed quickly, with those requiring support being placed
with the most appropriate service at the outset. Waiting times
remain an issue and a recognition that further improvement
activity is required.  Test for change in this area, part of MAT
standard improvement activity, will take place during 2022-23.     
Page 191 of 250

Page 192

Page 26 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
See Non-Fatal Overdose update recorded under National
Outcome 4 for more details re: initiatives to facilitate access to
services. 
Cross Reach continue link in with Housing, Welfare Rights, and
health & well-being services when working with families. 
Examples include NHS Child Smile to ensure registration with
Dentists, Speech and Language Therapy and Welfare rights. 
When a concern is highlighted, Cross Reach raise a safeguarding
referral for advice.   
Prisoner Release Meetings – Work had commenced pre COVID
to improve co-ordination of prisoner release (better links between
prison and housing – information sharing three months prior to
release managing housing needs) and the COVID early prisoner
release programme.  Fortnightly multi-agency meetings
commenced in August 2021 and continue to run fortnightly.   The
meetings are attended by CJSW, SCT, Housing, IDART, working
together to manage risks, provide support and to address any
accommodation issues.  The meeting frequency was set to allow
agencies time to react to any prisoners who received short
sentences or were released early.  The meetings consider people
who do not have a key worker:
• Consider current involvement with agencies
• Non-protective/protective factors
• Lead agency to own, act and escalate the risk/concerns.
• Tactical options to create an action plan inc. referrals for
support or to escalate to other agencies. 
People are supported to connect with services to address
unmet need.  I.e., Cross Reach supported a child and
grandmother to access art therapy.   
Proactive engagement and planning improves opportunities to
address issues, i.e., housing issues in advance of release
from prison, enhancing the support available to prisoners on
release.   
Work undertaken for the COVID Early Release Programme
has been built upon and proactive planning for release has
become embedded. Proactive planning takes place including
identification of suitable housing and provision of release
packs to people being released from custodial sentence to the
PK area (including information accessing services: GP,
benefits etc). 
From the launch of the meetings (August 2021) to end March
2022 57 people were discussed/supported via the prisoner
release meetings.   
100% of PK residents were offered accommodation on
release (April 2021 to end March 2022):
No.
people
Accommodation Type
Page 192 of 250

Page 193

Page 27 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
• Requirement to review. The lead agency can ask for any
client to be reviewed at any time. 
The model and frequency of meetings has been effective, and this
model of working has been adopted to support a new pilot, CARS
Arrest Referral Service (service launch July 2022). 
In addition to the regular meetings, work also took place to develop
a contact information pack providing information on key services
including welfare rights, food bank, PKAVS and other services
available to prevent relapse and sustain/develop housing
situation.  Feedback was requested from prison residents and a
speech and language therapist, and an easy read pack was
developed. 
Voluntary Throughcare provided by New Routes (nationally
funded throughcare service) available to males and Shine to
females.  Referrals for the service are made via Scottish Prison
Service while the person is in prison, via self-referral, or by
mentors directly offering the service.  Support is available to the
person up to six months pre, and for six months, post release.  All
areas of the person’s life are considered, and the worker supports
the person to meet their identified outcomes.   
52 (49%) Secure Tenancy (Council property/Registered
Social Landlord/Private Rent/Owner Occupier)
29 (27%) Temporary Accommodation (Greyfriars/
Skinnergate/ St Catherine’s Square) with
application in progress for secure tenancy
26 (24%) Other (Sofa surfing/family/partner/moved to
other area/ rehabilitation facility) 
No data available – % of people released from custodial
sentence registered with a GP; had a benefits eligibility check. 
People are supported to integrate with the community, engage
with relevant services, make progress towards achieving
identified outcomes.  Thirty-six people signed up for the New
Routes service during the reporting period.  Of those, twenty-
four have now exited from the service, four are on a
programme (in Prison, awaiting liberation date), seven are on
a programme (in the community) and one person disengaged. 
During the same period, four females signed up for the Shine
service.  Of those, two have now exited from the service and
two continue to receive support.   
It is recognised that improvement activity is required to
increase the uptake of voluntary throughcare within PK, this
Page 193 of 250

Page 194

Page 28 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Anchor House continue to offer a multi-agency community-based
service that is specifically aimed at people experiencing Mental
Health crisis. Some examples of the organisations/ services based
at Anchor House include: The Neuk, The Lighthouse Project,
Andy’s Man Club, Evolve, Women’s Wellbeing Club etc. 
The organisations delivering services at Anchor house have
developed their services with the recommendations of the
Independent Inquiry into Mental Health Services in Tayside
(published 2020) in mind.  The environment itself is a therapeutic
space in the community where people can feel secure. Person
centred assistance with their immediate mental health needs. 
The aim is to drive forward and develop solutions that take into
account the wider social and economic factors which impact on the
lives of communities and individuals. The service provision is
focused on the individual needing support and is pragmatic at
working at sustainable solutions. 
will be taken forward by the working group referenced under
new activities outcome 3). 
Limited resources are pulled together to respond more
effectively to identified need.  People in crisis are supported,
support is available 24-hours per day, seven days per week.
People are supported to overcome the causes and
consequences of mental health, social exclusion,
homelessness, poverty, unemployment, health inequality and
community disintegration.  Police have been able to offer an
alternative to police custody, where appropriate. 
NATIONAL OUTCOME FOUR Effective interventions are
delivered to prevent and reduce the risk of further offending
Where applicable have regard to the following indicators. 
➢ Use of ‘other activities requirements’ in CPOs 
➢ Effective risk management for public protection
➢ Quality of CPOs and DTTOs 
➢ Reduced use of custodial sentences and remand:
a) Balance between community sentences relative
to short custodial sentences under one year
Page 194 of 250

Page 195

Page 29 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
b) Proportion of people appearing from custody
who are remanded
➢ The delivery of interventions targeted at problem drug
and alcohol use [NHS Local Delivery Plan (LDP)
Standard]
➢ Number of Police Recorded Warnings, police diversion,
fiscal measures, fiscal diversion, supervised bail,
community sentences  (including CPOs , DTTOs  and
RLOs )
➢ Number of short-term sentences under one year
What new activities in 2021-22 were driven collectively by
the CJ partnership in relation to outcome four?
What was the impact of these activities? 
• See Specified Person pilot information, outlined under
National Outcomes 2, for details re: plans to improve
interventions targeted at problem drug and alcohol use 
What ongoing activities took place in relation to outcome
four?
What was the impact of these activities?
Effectiveness of interventions and is considered against the
backdrop of crime and criminal proceedings data.   
Scottish Government statistical data (Recorded Crime in Scotland
2020-2021 ) highlight a reduction in the crime rate (non-sexual
crimes of violence; sexual crimes; crimes of dishonesty; fire-
raising, vandalism etc; other crimes; coronavirus restrictions) in PK
over the past 10 years.  It has fallen from 5,965 crimes in 2009-10
to 4,868 in 2020-21, however, a small year on year rise noted
between 2018-19 (4,039), 2019-20 (4,384) and 2020-21 (4,868).
PK trend data largely reflect the national picture for the same
period.   
Crime Data and criminal proceedings data will be incorporated
into the Partnership’s Strategic Needs and Strengths
Assessment (SNSA) and will inform the Partnership’s next CJ
Outcome Improvement Plan enabling the Partnership to better
tailor services for PK residents.  Planning for SNSA activity
took place during the reporting period with SNSA activity
commenting during 2022-23. 
Page 195 of 250

Page 196

Page 30 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Scottish Government (SG) data (Criminal Proceedings within
Scotland 2019-20: Postcodes) 2019-20 was utilised to examine
number of Police Recorded Warnings, fiscal measures, supervised
bail, community sentences (including CPOs, DTTOs and RLOs),
and use of custodial sentences and remand.  Data for the period
2020-22 was not available at the time of writing.   
Please note: As per SG, all statistics presented in the following
tables are currently classed as ‘experimental’…. Liable to revision
as the data sources and methods used to produce them are
developed.  
Police Disposals 
2016-
17
2017-
18
2018-
19
2019-
20
2020-
21
2021-
22
Police
Warnings
213 223 289 215 * *
Anti-Social Fixed
Penalty Notice
292 202 158 72 * *
Crown Office Procurator Fiscal Service (COPFS) Disposals 
2016-
17
2017-
18
2018-
19
2019-
20
2020-
21
2021-
22
Fiscal measures 537 590 444 539 * *
Fiscal Fines 329 393 219 245 * *
Fiscal
Compensation
13 27 9 14 * *
Fiscal Fixed
Penalties
142 127 147 207 * *
Fiscal Combined
Fines
52 42 69 73 * * 
The number of Police recorded warnings rose between 2016-
17 and 2018-19, however decreased (close to the 2016-17
level) in the 2019-20 reporting period. In contrast, a year-on-
year decrease in Anti-Social Behaviour Fixed Penalty Notices
is noted. 
The number of COPFS fiscal disposals fluctuated in recent
years. The number of fiscal fines also fluctuated.  Fiscal
compensation disposals also fluctuated over the same period.
In contrast, since 2016-17 increases are noted in both Fiscal
Fixed Penalties and Fiscal Combined Fines with
Compensation. 
Page 196 of 250

Page 197

Page 31 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Number of convictions 
2016-
17
2017-
18
2018-
19
2019-
20
2020-
21
2021-
22
Number of
convictions
1546 1465 1411 1542  * *
Custodial
sentences
279 278 280 273 * *
Community
Sentences
352 348 279  306 * *
Financial
Penalty
774 704 713 815 * *
Other 141 135 139 148 * *
Custodial sentences 
2016-
17
2017-
18
2018-
19
2019-
20
2020-
21
2021-
22
Between 0
and 6
months
181 164 171 167 * *
6 months to
1 year
59 63 59 56 * *
1 and 2
years
18 30 32 25 * *
*Scottish Government Data Not Available 
Concerning remands, Scottish Prison Service (SPS) Annual
Population Data highlights an increase in the number of remands
nationally.  The number of males on remand has increased, year
on year, rising from 1,282 in 2016-17 to 2,012 in 2021-22.  The 
When considering the type of sentence imposed, the number
of people receiving a custodial sentence was the only one to
decline (small decline) during 2019-20 despite the overall rise
in number of convictions.  Impact of the increased use of
alternatives to custody – lesser disruption to lives and routines
(those who have committed offences and their family). 
Of those receiving a custodial sentence, the number of short-
term sentences of between 0 and 6 months fluctuated
between 2016-17 and 2019-20. The number of sentences of 6
months to 1 year decreased slightly between 2017-18 and
2019-20.  The number of sentences of between 1 and 2 years
increased between 2016-17 and 2018-19 but saw a decline in
2019-20.   
Impact for the individual – interruption to family
connections/relationships, interruption to community
connections impact on employment/study, loss of income for
the household etc.   
Page 197 of 250

Page 198

Page 32 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
number of females on remand over the same period was relatively
unchanged, 88 in 2016-17, 91 in 2020-22. 
PKC, Criminal Justice Social Work data 
2016-
17
2017-
18
2018-
19
2019-
20
2020-
21
2021-
22
Diversion from
Prosecution
(commenced)
Data not
available
35 35 35 41 38
Community
Payback Order
455 391 346 353 148 278*
Fiscal Work
Order
Assessments
23 13 8 4 1 0
DTTO 3 5 3 2 1 6
*Subject to change (CPO statutory return 2021-22 in progress) 
Available Interventions
PKC’s Criminal Justice Service offer a Diversion scheme based
on the waiver model (whereby the Procurator Fiscal “waives”
prosecution once the decision to divert is taken). The support
provided to those offered diversion is always delivered on a one-
to-one basis by an allocated Criminal Justice Assistant based
within CJSW. On occasion where there are more complex needs
or issues, a social worker may also work alongside. The nature of
the support is to look at behaviour that may put the person at risk 
The number of diversion cases has been relatively static.  The
number of CPOs increased from the previous reporting period
but remained lower than pre COVID-19 levels during the
reporting period. DTTOs increased during the reporting period
and Fiscal Work Orders reduced further to zero.   
Impact – People participating in Diversion receive support to
address unmet need/offending behaviour and are diverted
from the justice journey.   
In 2021-22, CJSW undertook 69 Diversion assessments and
of those 38 Diversion cases commenced (three fewer than
2020-21).   
Page 198 of 250

Page 199

Page 33 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
of committing further offences and to offer practical support and
advice, usually by signposting people to appropriate services.
Also, where existing services are in place, liaison will take place to
ensure that the person is engaging with such services. Any
individual referred by the Procurator Fiscal may be eligible to
participate in the diversion scheme. 
CJSW, in partnership with the Children and Young Person’s
Service, offer Bail Supervision (commenced 2019).  The
overarching objective of Bail Supervision is to provide a credible
alternative to remand for courts to use in appropriate cases.  Bail
Supervision aims to:
• Provide support to people in the community, which minimises
disruption to families, employment, and housing; and
• Promote positive outcomes for people and their families (where
appropriate), taking account of the needs and impact on others
including victims, children, family, and community members,
while supporting and monitoring compliance with bail conditions
and the overall criminal court process
• Focus on identifying and building upon the strengths, capacity,
and resilience of the person (and their networks, where
appropriate), with a focus on achieving positive outcomes
during the Bail Supervision period. 
The intensive service sees the person work with their Bail Officer
up to three times a week, including home visits where appropriate.
The work carried out is specifically targeted to identified need and
can involve a range of other service providers including, I-DART,
Streets Ahead, Hillcrest Futures, Skills Development Scotland, 16+ 
Extending the eligible age range provides wider service
access and provides the Court an alternative to remand
across the age range.   There is also a positive impact for
families, children and the individual as it provides opportunity
for family, social and economic relationships to continue in
line with The Promise.   
“Bail Supervision provided me with support, in my
housing, and helped me sort my life out”. 
“A” was making poor decisions through consuming alcohol
which he had used for many years, and contributed to his
offending, securing a place in Jericho House, provided him
with accommodation, support to become abstinent, which
resulted in him completing his Bail Supervision Order,
receiving a fine and has not committed any further offence. 
“B” was assessed by another Local Authority, liaising with
their Bail Officer, “B” was transferred into PKC as she moved
areas and secured a tenancy in PKC geographical area. “B”
received one formal warning letter for not turning up for one of
her scheduled appointments. After the first warning, her
Page 199 of 250

Page 200

Page 34 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
team, Rape and Sexual Abuse Centre (RASAC), PKAVS, Police
Scotland, Venture Trust, Welfare Rights. 
The Bail Supervision service within PK extended the eligible age
criteria in January 2022, from 16 to 26, to 16 and over.  Criminal
Justice Assistants now support the service in addition to the
dedicated support from the Young People’s Service to meet the
increased demand. 
The Bail Supervision Service compliments and dovetails with
Structured Deferred Sentence (Right Track) which supports young
people entering the justice system.  Additionally, preparatory work
also took place with Bail Supervision in the planning of Arrest
Referral to ensure the services complimented each other and
minimised duplication.   
compliance improved. “B” understood why her compliance
and engagement was important, “Bs” case was heard, and the
sheriff imposed a 12-month CPO which “B” has complied with
to date with no further warnings being issued, she has settled
well into the area, engaging with relevant services to continue
to meet her needs. 
Young person “C” had a chaotic lifestyle and involvement in
the care system and police for many years. “We only worked
together for 4 months but in that time the young person
gained full time employment, sorted out housing
concerns (issues with neighbours) supported to move
back with foster parents and stayed away from the court
system enjoying a good relationship back home. The
young person keeps in touch to let me know how things
are for them in their lives and knows to get in touch if
needed.” (Bail Supervision staff member) 
“The support from (worker) has really helped me
understand my past and where my anger comes from. 
I’m trying hard to make the changes I need to help my
mental health. With (worker’s) support I feel I am in a
better position to do that”.  (Person in receipt of Bail
Supervision) 
The number of people receiving Bail Supervision has
increased since the service was extended to those aged 16
and over.  Between April 2021 and April 2022, 33 requests
were received from the court (bail opposed), an increase of
Page 200 of 250

Page 201

Page 35 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Right Track within PK is a sentencing option for the Court to place
any young person under the age of 26, on a structured deferred
sentence, usually for a period between 6 months initially but often
running for a year. The programme is recommended for this age
group as often they are unlikely to be able to comply with the
rigours of a Community Payback Order (CPO), due to their chaotic
lifestyles. 
When a young person attends the Right Track Programme, they
are given a combination of individual sessions with the Right Track
co-ordinator, and also asked to attend the work project at
Westbank. The work project provides an opportunity for the young
person to engage in gardening skills and some hands-on simple
building skills like bird boxes and benches. They have access to a
five from previous reporting period.  Bail Supervision was
imposed in 16 of those cases (increase of 9 from the previous
reporting period), 17 were granted bail without supervision,
one person was remanded. 
At sentencing stage, four were given a CPO, two were given
Structured Deferred Sentence (Right Track) and two a
custodial sentence.  The remaining were awaiting a court
decision. 
“We are seeing less use of remand, ensuring people are
given access to support in the community, who may not
have known where to access services”. (Bail Supervision
staff member) 
The service had 14 young people participating in the
programme during April 2021.  At this time, COVID-19
restrictions were still impacting/limiting local Court business. 
This number had increased to 25 young people by April 2022. 
The increase reflects Court business increasing, along the
Sentencing Young People’s Guidelines coming into effect,
January 2022. The Right Track model operates within the
values and beliefs underpinning the new sentencing
guidelines. 
Partnership working increases the speed of access to
services for young people.   
Page 201 of 250

Page 202

Page 36 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
large shed where they can shelter, have a hot drink and snacks
are provided.
The young person participates in an initial assessment, using a
Wheel of Life, to ascertain their presenting welfare needs as well
as their criminogenic needs. They are supported to access many
welfare services such as G.P., mental health services, substance
misuse services, along with other support services available within
the Westbank Project. Partnership working and engagement onsite
increased during 2021-22.   
When a young person attends the Right Track Programme, they
must commit to addressing their offending needs and have the
opportunity to engage with a number of modules including anger
management, domestic abuse, consequential thinking etc.  The
positive relationship with the Right Track worker is fundamental to
the process of change for the young person. 
To adequately resource the increased use of structured deferred
sentence, Right Track now has a Social Worker attached to the
service 2.5 days a week in addition to the full time Criminal Justice
Assistant.  Consideration is being given to proposing Youth Courts
within PK, to improve overall outcomes for young people in the
Justice system. 
Caledonian – The completion of Domestic Violence (DV) Court
report requests was extended to those not Caledonian trained but
trained in the use of the SARA-v3 (Spousal Assault Risk
Assessment-Version 3). DV Court Report requests increased from
52 in 2020/21 to 85 in 2021/22. Staff within the team not trained in
Some comments from young people outlining the impact/what
worked include:
‘It has given me structure to my life’.
‘You know how to work around someone’s mental health’. 
‘I like that I get to have meetings out of town as I don’t
like going into the town due to the folk there’. 
‘I know it is a serious programme but at the end of the
session, it’s nice to be able to have enjoyed a laugh as
well’. 
‘I find it a place to voice things when they go wrong, and
it is really good to be listened to’. 
‘I like the small groups we get put in as there is little
arguing’. 
‘I understand the Work Project helps me payback to the
community for all the bad stuff I have done’. 
Impact – Workload for Caledonian trained staff reduced whilst
at the same time understanding and knowledge of domestic
abuse increased within the team (SARA trained staff). 
Page 202 of 250

Page 203

Page 37 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
SARA-v3 were put forward for training. Two members of staff were
also identified to become SARA trainers, with the intention of
improving access to SARA training in the future, carried out in-
house in partnership with Dundee CJS. 
The role of Women’s Worker and Children’s Worker moved over
from Women’s Aid to Action for Children (AfC) during 2021-22. AfC
staff also completed a range of training during the period, including
Women’s Worker, Children’s Worker and Groupwork Facilitator
training, the latter allowing us to contribute to the groupwork
staffing team based at Dundee CJS. 
All suitable staff not trained in the Caledonian system were identified
and put forward for screening assessment. Three members of staff
successfully completed screening and await a placement on the
fuller training packages (Introduction to Caledonian; Case Manager
training) expected 2022/23. Direction from the National Caledonian
team is to not put forward colleagues who are not ready for
screening.  Four members of staff were not suitable for screening
during the reporting period, though, as indicated, they were put
forward for SARA training to allow them to complete DV Court
reports and build their confidence and experience in such work (i.e.,
with the view for future referral to Caledonian screening). 
A broader aim of Caledonian work is to improve multi-agency
working between CJSW and Multi Agency Risk Assessment
Conference (MARAC) and Perth & Kinross Violence Against
Women Partnership (PKVAWP). Consultancy with Perth Court 
This has allowed for an easier process of information sharing
between AfC staff and the CJS Social Workers assessing,
and supervising men convicted of domestic abuse. 
Increased resilience within the team – assessment of risk. 
Sixteen members of staff were identified to complete MARAC
Representative training; and the Senior Practitioner (with
responsibility for Caledonian Programme) regularly attends
PKVAWP meetings. In addition to this, monthly meetings were
setup with the three arms of the Caledonian System: case
Page 203 of 250

Page 204

Page 38 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Sheriffs and Clerks was also carried out during the period to inform
them of progress and plans with the Caledonian work. 
CPO feedback - CJSW have been exploring alternatives to the
use of questionnaire style surveys to gather feedback and during
this process the consistent completion of surveys ceased. 
Different tools have been used during this period and it is therefore
not possible to aggregate the data.  It is planned that a single tool
will be identified during the next reporting period which will allow
consistent reporting going forward.   
The Unpaid Work Team continued to use the questionnaire to
monitor the quality of unpaid work during the reporting period.   
managers, groupwork facilitators, and AfC. This was to
develop are closer multi-agency working processes within
Caledonian, discuss complex cases, and resolve any process
issues stemming from Caledonian work (e.g., completing
psychometrics, data sheets; etc). 
Feedback from individuals during 2021-22 continued to be
generally positive.  For example, individuals commented: 
Forty-four people completed the unpaid work survey during
the reporting period: 
• All those completing the survey confirmed that the Unpaid
Work requirement had been explained clearly and
sufficient information was received “All information was
explained clearly”. 
• All those completing the survey felt their circumstances
were taken into account “Extremely helpful especially
around work commitments”. 
• 98% found the work they were asked to do worthwhile,
93% confirmed they enjoyed the work. 
• 40% respondents reported learning new skills, 55% made
new friends, 33% learned how to work on their own, 63%
learned how to work in a group, 35% learned how to use
specialist material, 18% felt they did not learn a new skill. 
Page 204 of 250

Page 205

Page 39 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
• All those completing the survey reported good support and
encouragement from their case manager and project
officer. 
• What respondents liked most about Unpaid Work:
“Meeting new people”, “I enjoyed the gardening”,
“Feeling useful”, “Working as a team”, “Helping
Others”, “The people helped me deal with my drinking
issues and move a step forward with my life. Learnt
key skills to use in my daily life”, “Getting out the
house and mixing with people”, “Doing different tasks
and being able to help people who need the help”. 
• 98% felt that Unpaid Work had helped them to stop or
reduce their offending behaviour. 
“Kept me out of jail”, “Help get motivated”, “The
embarrassment and the inconvenience of doing it, are
I think what helps”, “Being able to focus and
understand about my offending”, Kept me busy,
“Routine”, “It’s been a huge wake up call for me and
that I don’t want to be back. Talking with the
supervisors has been very helpful I will miss working
with them and helping different people”, “Not drinking
as much”. 
One respondent added “Thank you for my forklift training”. 
Page 205 of 250

Page 206

Page 40 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
The following provides examples of ‘Other Activity’ carried out as
part of Unpaid Work Requirement during the reporting period
include:  
• Courses enhancing employability opportunities –
Construction Skills Certification Scheme (CSCS) training,
Forklift Training, CV creation etc. 
• Working in community gardens i.e., volunteering Crieff
Community Hospital, 
• Charity / Voluntary work, 
• Driving training (paid for by the individual) – improve driving
skills and enable person to have license returned sooner.   
• Counselling/ wellbeing support including trauma
counselling.  
As evidenced above, a person-centred approach is taken with the
arrangement of ‘Other Activities’, as part of the unpaid work
requirement.     
During the reporting period Drug Treatment and Testing Orders
(DTTOs) were limited to five within PK, at any one time.  Concern
identified by CJSW regarding the limited capacity potentially
negatively impacting on DTTO recommendations being made to
the court (recommendations based on known capacity as opposed
to identified need).  Proposal put forward to increased DTTO
capacity to 10, which received provisional internal approval during
the reporting period (pending discussion with NHS partners and
launch of Specified Person Pilot (p.18)).   
Impact:  Improving employability opportunities, improving
access to mental health services and equipping people with
new skills.  The community also benefits from the activity, for
example via some of the work completed during that activity,
and the new skills people have gained e.g., improved road
safety. 
Anecdotally, the limited capacity results in people who would
be suitable for DTTO receiving CPO drug treatment
requirements, supervision, or prison-based sentence in place
of the DTTO.  It is anticipated that plans to increase capacity
will increase suitability of disposal. 
Page 206 of 250

Page 207

Page 41 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Partners continue to participate in other groups concerned with risk
management for public protection in addition to MAPPA. These
include: 
1. HRARG (High Risk Adult Review Group) 
This multi-agency group only sits in PK and is a forum which
follows the exact same template as the MAPPA process. Any
agency with significant concerns regarding the risk of serious harm
can refer for multi-agency discussion. 
2. Care Program Approach (CPA) 
Multi-agency meetings chaired by Health, held in respect of mental
health patients who also have a level of criminality which has led
them to be under the management of the health service. This is
generally in relation to acts of violence perpetrated by the patient
but could also include risks of harm through other activities such
as fire-raising etc. 
Interventions Targeted and Problem Drug or Alcohol Use
PKC’s CJSW Service, working in partnership with other agencies
e.g., TCA continue to have responsibility for directing people to
specialist drug and alcohol services either voluntarily or through
referral as per Drug or Alcohol Treatment Requirement attached to
a CPO.  More detail re: the joint approach adopted to delivering
those interventions can be viewed under National Outcome Three
– Multi-agency referral hub. 
Non-Fatal Overdose Group is made up of IDART, Scottish
Ambulance Service, Police Scotland and relevant third sector 
Risk is managed/minimised via engaging in a multi-agency
approach. 
Risk is managed/minimised via engaging in a multi-agency
approach. 
Referrals are directed to the appropriate service quickly.   
Same day, in person contact is made.  Access to support is
offered.  Hillcrest Futures, NFOD partner, take part on the
Page 207 of 250

Page 208

Page 42 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
partners. The group meets on a daily basis to discuss any non-
fatal overdose incidents that have occurred over the previous 24
hours within PK. The working group commenced in May 2021.   
The circumstances of the overdose are discussed.  Where
possible, support visits are carried out the same day to provide
harm reduction advice, Naxolone and training can be provided,
and any further support needs can be identified. 
PK established a Non-Fatal Overdose Pathway during 2020-21.
IDART receive information from colleagues in Scottish Ambulance
Service and Police Scotland with respect to any non-fatal overdose
incident that either or both services attended. 
Hillcrest Futures provide a holistic support service to adults aged
25+, whether it be one-to-one support or group support. During the
reporting period the service supported 223 individuals in relation to
substance use.  Referrals have increased after COVID-19, the
daily call, responding to the needs of those vulnerable and at
risk. Community recovery staff in partnership with harm
reduction have supported assertive outreach visits to
community hostels, supporting harm reduction drop ins in the
community, supplying naloxone and support to access
treatment as well as informing and providing overdose
awareness training to staff.   During COVID-19 Hillcrest
Futures Adult Drug and Alcohol team assisted with the
delivery of OST alongside statutory treatment services to
those most vulnerable.  This ensured continued engagement
with those most at risk whilst at the same time maintaining
social distancing.   
Since the group commenced, 160 incidents have been
discussed at the group relating to 85 people, 32 of whom have
recorded repeat incidents which account for 107 of the
incidents (67%).  The week-to-week figures continue to
fluctuate with the year-to-date weekly average increasing to
five in the first initial weeks of year two.  The male to female
ratio remains constant at 82% male to 18% female with the
key days for recording incidents at the start of year two being
a Monday, however cumulatively Friday and Saturday remain
the most prevalent days. 
Impact – support provided support to those who feel they
cannot attend a meeting on their own and people have the
opportunity to experience inclusion through connecting with
others and hearing the inspiring stories of change.  People are
supported to engage with services and to engage in the
Page 208 of 250

Page 209

Page 43 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
majority of which have been for alcohol, cannabis and cocaine,
along with a noticeable increase in people needing mental health
support also.   
Hillcrest Futures provide support for individuals who may not yet
be ready for structured one-to-one support and/or those who are
getting ready for going into detox.  Hillcrest Futures support those
interested in attending recovery groups/ cafes to attend.  The
support provided is around managing thoughts, feelings and
behaviour in regard to their illness, but also by providing tools
which can be useful for their recovery. These tools range from
Smart Recovery and Relapse Prevention.   
Another example is the Hillcrest Futures Harm Reduction Service
involvement in Injecting Equipment Provision (IEP).  A postal
service option was provided resulting from COVID-19 lockdowns. 
recovery journey.  Notable increase in people engaging with
support delivered in new ways to the traditional face to face
delivery model.  For example, service delivered via devices –
including phone call and maintaining contact with young
people remotely via phone, WhatsApp and Instagram.   
This method of service access attracted more females to the
support.  Half of those using the postal service over the month
of July were female. Over the same period, only 24% of
people using the traditional onsite service were female.
NATIONAL OUTCOME FIVE
Life chances are improved through needs, including health,
financial inclusion, housing and safety, being addressed.
Have regard to the following indicator. 
➢ Individuals have made progress against the outcome 
How do partners measure outcome five for individuals? If this information has been collated, what does it show? 
TCA Mentoring services involve individuals in range of activities
that are undertaken to meet this outcome and result in positive
change. 
TCA Mentoring for Men service engages with CJS clients with
a community outreach approach.  There were 14 active
Mentoring for Men clients, an increased from the previous
year, however, still lower than pre pandemic.  The service has
capacity to work with 10-12 clients, depending on their
locality.  Over the reporting period there were 9 referrals
made. Although this is an increase of 6 clients from last year,
the service requires further referrals to reach capacity.
Page 209 of 250

Page 210

Page 44 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Mentoring for Men Outcomes 2021-22                                                           
Mentoring for Men Got
better
Stayed
Same
Deteriorated
Substance Use 3 3 0
Self-Care 1 5 0
Relationships 0 6 0
Physical Health and
Wellbeing
2 4 0
Mental Health and
Emotional Wellbeing
1 5 0
Occupying Time and
Achieving Goals
2 4 0
Housing and
Independent Living
3 3 0
Offending 4 2 0
Money Matters 3 2 1 
Mentoring for Women (OWLS) Outcomes 2020-21
There were 16 active OWLS Mentoring clients during that
period. Weekly or twice weekly telephone support calls were
made and where it was required support face to face outside
socially distanced was arranged. Weekly updates are sent to
referrers and cases are reviewed on a regular basis to make
sure the service is meeting the agreed outcomes for the client.   
All the mentees appreciated telephone appointments and
support and 79% of mentees attended their appointments. 
Page 210 of 250

Page 211

Page 45 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
The service provided by Hillcrest Futures is another example of
holistic support offered to PK residents.  The service focusses on
prevention of use AND also the changes required in order for the
young person to succeed.  Hillcrest Futures promotes positive
development via empowerment; meaningful opportunities to learn
skills, assume responsibility, participate and be involved in the
OWLS Got
Better
Stayed
the
Same
Deteriorated N/A*
Substance Use 3 2 2 1
Self-Care 3 2 2 1
Relationships 4 2 2 0
Physical Health
and Wellbeing  4  2  2  0
Mental Health and
Emotional
Wellbeing 
4 2  2  0
Occupying Time
and Achieving
Goals 
5 1  2  0
Housing and
Independent
Living 
3 3  1  1
Offending 4 3 1 0
Money Matters 2 5 1 0
*N/A- Not Applicable 
During the reporting period Hillcrest Futures have supported
223 people and a received a range of referrals from
organisations include IDART, mental health services, schools,
social work, homelessness support, criminal justice, Police
and GP.   
Page 211 of 250

Page 212

Page 46 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
wider community; opportunities to demonstrate their success and
have their achievements reinforced.   
Wider support than drug and alcohol education is offered i.e.,
opportunities to develop life skills that will enable people to
improve their thoughts about themselves, their lives and the way
they interact with other people.   
Cross Reach (located at Perth Visitor Support and Advice Centre,
HMP Perth) provide support to prison visitors both locally and
nationally.   
Cross Reach continue to refer to The Trussell Trust nationally for
food banks. Cross Reach link in with School Uniform banks/Baby
banks, fuel poverty awareness/support & issued £400 of
supermarket vouchers which were used by families for food. 
Cross Reach also gave out over 200 new gifts to children.
During the reporting period, Cross Reach supported families to use
the Perth Visitors Support and Advice Centre to support virtual
visits, for example the prisoner is in another prison & the family live
in PK they do not need to travel as much & can be supported to
set up their visit by Cross Reach staff. 
Cross Reach continued to offer anxiety management during the
reporting period and continued to report Children’s Outcomes
using Safe, Healthy, Achieving, Nurtured, Active, Respected,
Responsible (SHANARRI). Cross Reach also offered SMART
Recovery for friends and families and a separate session for those 
Partnering with relevant professionals i.e., education, leisure,
health, family support, criminal justice, drug and alcohol
service etc supports the provision of diverse and integrated
support vital to the people managing their own recovery. 
Cross Reach activities supported families who were in crisis.  
The support enabled the families to work through other issues
which were secondary to the crisis but impact on their daily
lives.  Examples of the impact from the range of activities
included: supporting the meeting of basic need, improvement
in functioning & general well-being, improvement in
relationships and improvement in learning.  The creative
working enabled relationships/connections are maintained. 
Page 212 of 250

Page 213

Page 47 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
in recovery. Cross Reach measure impact via safeguarding
referrals, feedback from families and observations.
If available, provide a supporting case study or other
information to demonstrate activity and impact relating to
outcome five. 
Case study (opposite) TCA linked to TCA mentoring services. 
Case study (opposite) linked to Hillcrest Futures example above. 
Case study (opposite) provided by SCT. 
Ouctome 5 Case
Example TCA.docx 
Outcome 5 Case
study - Hillcrest Futures.docx 
2022-07-13 Case
Study CJ&SP.docx
NATIONAL OUTCOME SIX
People develop positive relationships and more opportunities to
participate and contribute through education, employment and
leisure activities
Have regard to the following indicator.
➢ Individuals have made progress against the outcome 
Providing evidence on person centric outcomes has been
challenging for most areas.
How do partners measure outcome six for individuals?
If this information has been collated, what does it show? 
The Westbank Hub provide opportunities for a range of
community groups These include: 
The support available continued to be impacted by COVID-19
restrictions, with reduced numbers (one to one working) for a
Page 213 of 250

Page 214

Page 48 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
• Young people who have disengaged at school continue to
come to the site and gain an insight to work, learn new skills
and work towards qualifications in partnership with their parent
school. 7 young people attended Westbank during the reporting
period.
• Individuals involved in unpaid work, 
• Older people who are isolated through illness, bereavement or
other causes continued to have the opportunity to engage with
other people, learn new skills, build their confidence and learn
how to ready themselves for the job or volunteering market.
• Women who have physical, mental-health, offending and
addiction issues continue to have opportunities to engage with
individuals and groups through OWLS to learn new job skills,
build their self-confidence and self-esteem making them better
able to consider future employment prospects and/or
volunteering.
They do this through working with others at the Westbank project
through:
• Horticulture,
• Plant maintenance and distribution,
• Joinery and manufacturing,
• Furniture renovation,
• Beekeeping,
• Allotment cultivation,
• Grounds maintenance,
• Painting and decorating.
large portion of the reporting period.  An internal upgrade the
workshop also impacted on the team’s ability to deliver
joinery/furniture renovation for a period.  However, the service
did continue to operate, albeit at a reduced capacity and
people continued to have the opportunity to learn new skills,
develop interests/hobbies, attain basic certificates and ready
themselves for the job market (or other positive destinations).   
Page 214 of 250

Page 215

Page 49 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
In addition, this is achieved through working with other agencies
who deliver courses in:
• First Aid,
• Cardiovascular preparation,
• Confidence and team building,
• Health and Safety,
• Ground maintenance,
• Plant care and maintenance. 
Westbank continued to be fully accredited by the Road Traffic
Industry Training Board (RTITB) delivering internationally
recognised certificated Forklift and Telehandler training. This is
available to those furthest from the workplace via partnership with
the Employability Network, the Westbank Hub (Outreach),
Department of Work and Pensions (DWP), HMP Castle Huntly,
education services, mental health and learning disability support
groups.   
A Skills Academy for European Social Fund (ESF) offered
candidates Fork Truck and Telehandler courses during the
reporting periods.  Thirty-three courses were delivered with a total
of 46 people attending (combination of people referred by Skills
Academy and Westbank).   
Other future plans for the Hub concern the installation of a fully
fitted vehicle workshop where candidates can be trained in vehicle
maintenance, servicing, inspection, tyre fitting, valeting, welding
and metal fabrication. Structural changes to the area are 
During the reporting period three people took part in tele
handling training, and four people undertook fork truck training
following a CPO, with one individual confirming they had
gained employment.   
A awaiting list built up due to COVID-19, however, Westbank
staff service kept people informed of the waiting list and
people were happy to attend the course when offered a place. 
By the end of the reporting period there was a waiting list of
29 people, a small increase from the 21 waiting at the start of
the reporting period.  
Impact – Improving life chances through increasing
employability options.   
Page 215 of 250

Page 216

Page 50 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
continuing and it is expected the workshop will be fully operational
by operational October 2022.   
Hillcrest Futures involve individuals in range of activities that are
undertaken to meet this outcome and result in positive change. 
With longer periods of reduced COVID-19 restrictions during the
reporting period it was possible to restart group activities.   
The Relapse Prevention, a popular group, restarted supporting
people to prepare for detox. Additionally, Hillcrest Futures support
recovery cafes spread across PK to support those in recovery.
Hillcrest Futures work in partnership with NHS community project
workers to supply the recovery cafes with other agencies such as
Mental Health teams, housing or harm reduction teams to come in
and give advice to those attending.   Different activities are
undertaken in the cafes, ranging from gardening to arts and crafts
to some mindfulness in order for them to find alternative coping
mechanisms. 
Peer Education SCT in PK established Peer Education multi
agency working group.  The focus of the group is to address risk
taking behaviours utilising partners statutory and third sector
partners. Hillcrest Futures are one of the lead agencies for
delivering peer education and up skilling wider services across PK
around substance use and associated behaviours.  To date
Hillcrest Futures have delivered 3 Peer Education sessions with 12
young people taking part.  Peer Educators designed a “survival kit”
education programme alongside staff from PKC Community
Learning and Development to deliver to Perth City schools.  The 
During the reporting period, Hillcrest Futures have delivered
50 group sessions and had 90 individuals attending. Groups
have been delivered by staff and peers across PK to people
affected by substance use. 
A new recovery group initiated is a poly drug use mutual aid
support group delivered by people with lived experience. This
was initiated following asking people in recovery where they
felt there was a need / gap in the recovery community.  To
date, 7 sessions have been delivered with a total of 22 people
attending. 
Impact – Improving life chances through providing opportunity. 
Hillcrest Futures Foundation provided funding to provide
attendees an accredited award following completion of the
peer education with the following delivered, Dynamic Youth
awards and Youth Achievement awards to young people. The
Youth Scotland awards are nationally recognised by the SQA
and recognise and accredit the achievements of young people
of all ages and stages. 
Page 216 of 250

Page 217

Page 51 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
sessions comprised of harm reduction education regarding
substance use, nights out, consent and the law, local and national
support services and promoting services.
If available, provide a supporting case study or other
information to demonstrate activity and impact relating to
outcome six. 
OWLS case example (opposite) 
Case study (opposite) linked to Hillcrest Futures example above
Outcome 6 Case
Example OWLS.docx 
NATIONAL OUTCOME SEVEN
Individuals’ resilience and capacity for change and self-
management are enhanced
Have regard to the following indicator.
➢ Individuals have made progress against the outcome 
Providing evidence on person centric outcomes has been
challenging for most areas.
How do partners measure outcome seven for individuals?
If this information has been collated, what does it show? 
OWLS organised a range of activities for women during the
reporting period linked to this outcome.  Examples and associated
impact are outlined in the in the engagement activity examples
below.   
In recognition of the power of peer support, a woman supported by
OWLS, completed Peer Mentor Training through “Grace Chocolate 
Page 217 of 250

Page 218

Page 52 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
Foundation”, and is currently mentoring another person providing
peer support through lived experience. 
Hillcrest Futures Adult Drug and Alcohol service offer a wide range
of activities linked to this outcome and positive change.  Hillcrest
Futures supported 223 people referred to them via other
organisations; referrers include mental health services, schools,
social work, homelessness support, criminal justice and GP.   
Hillcrest Futures also provided support to people not yet ready for
structured one-to-one support and/or those who are getting ready
for group participation.  The support provided is around managing
thoughts, feelings and behaviour.
“Grace Chocolates helped me complete my peer mentor
training, OWLS helped secure me a laptop to enable me to
participate in online training. I wanted to create a better life
not just for me but also for my family and it makes me want
to become a worker within OWLS, showing the right
support can make such a difference”. 
Of the 223 people (148 male and 75 Female) who engaged
with one-to-one support: 
• 166 people had a positive discharge from the service, 
• 28 unplanned discharges
• 17 people reported a significant reduction in their
substance use 
• 12 people went onto a positive destination including
further education and employment  
If available, provide a supporting case study or other
information to demonstrate activity and impact relating to
outcome seven. 
Case study (opposite) linked to Hillcrest Futures example above. 
Engagement activity examples (opposite) provided by OWLS 
Page 218 of 250

Page 219

Page 53 of 55
6) Performance Reporting – National Outcomes
This section is designed to capture the evidence and data that
has been used by your partnership over the reporting period
to assess progress against the national outcomes. 
OWLS Examples
Outcome 7.docx 
7) If you have identified other local CJ activities and
outcomes which go beyond the national outcomes,
then record them here.
Local outcomes 
Please describe the activity Then describe the impact
Not applicable 
Page 219 of 250

Page 220

Page 54 of 55
8) What other achievements and challenges happened? 
Achievements Challenges
Access to various services continued to be disrupted for
individuals because of the COVID-19 pandemic. The CJ&SP and
partners adapted quickly to changing restrictions:
• CJSW provided skeleton office-based staff (during heightened
restrictions).
• Telephone appointments were provided along with face-to-
face appointments, where essential (during heightened
restrictions).   
• Mobile phones were purchased/supplied to individuals who
with no telephone access to allow contact to be maintained. 
• A hybrid model of working has developed during 2021-22. 
Where COVID-19 restrictions allowed, face to face meetings
were held, other meetings were held via MS teams and on
occasion hybrid meetings were held.
• MAPPA meetings continued via MS Teams during 2021-22,
identified benefits of partners not needing to travel. 
• Cross Reach now have a presence in the waiting area of
Perth Prison and are able to offer their support to all visitors
waiting in the waiting area. 
In addition to the above the CJ&SP hosted a visit with John-Paul
Marks (Permanent Secretary) and Joe Griffin (Director General of
Education and Justice) during the reporting period.  The visit was
split between the HMP Perth and the Westbank Project.  A Vlog
of the Permanent Secretary’s Visit can be viewed here .  The
CJ&SP appreciated the opportunity to share details regarding the
positive work taking place within PK and share some of the issues
encountered, both locally and nationally.  
• The Partnership’s opportunities to engage with local Sheriffs
continue to be limited during the reporting period.  However,
court liaison meetings did restart (Sheriffs, CJSW and
COPFS) along with meetings between the Sheriffs and
Senior Practitioners within CJSW.  Closer working
relationship between the local Sheriffs and the Partnership
would be welcomed as, amongst other issues, it would
enable partners to engage in meaningful dialogue
concerning sentencing decisions and concerns raised by
local communities. It is hoped that some mechanism for
regular liaison can be established in future. For example,
briefing sessions or attendance at Partnership meetings. 
• The continuing lack of opportunities for prisoners leaving
custody to access appropriate and timely mental health
support.
• Increased waiting times for access to services generally
resulting from COVID-19.
• Recruitment and retention of skilled staff – the short-term
nature of Government funding can result in worthwhile
projects being initiated but later ceasing. The short-term
nature of funding commitments also continues to result in the
use of fixed term contracts which can result in both
recruitment issues and high turnover of skilled staff.  
• Rapid GP registration – prisoner release – remains an issue.   
Page 220 of 250

Page 221

Page 55 of 55
9) Additional Information including, next steps for the partnership
The information in this report has been provided by the following Statutory Partners and Third Sector Forum members: PKC;
Police Scotland; Scottish Prison Service, Scottish Fire and Rescue Service, Skills Development Scotland, Tayside Council on
Alcohol, Hillcrest Futures, Cross Reach, Turning Point, Families Outside, New Routes and Shine. 
Please note, ongoing COVID-19 pressures/staffing issues impacted on opportunities for some partner organisations to participate
in the 2021-22 annual report. 
The collection of information for this annual return highlighted the differing method within PK to collect person centric outcome
information.  Through dialogue with both statutory and voluntary organisations it has been identified that there are pockets of
shared tools being used i.e., Justice Star, Outcomes Star, Wellbeing Wheels (Evolve), SHANARRI wheel (Hillcrest Futures, Cross
Reach) etc.  
Varied use of varying tools will allow an individual / worker to visualise progress and will allow aggregation of data at an
organisational level, but limits opportunities to identify outcomes/impact themes at a Partnership level.   
Next steps for the partnership
• Baseline existing Partnership against the new National Strategy for CJ,
• Progress SNSA activity,
• Incorporate above into new CJ Outcome Improvement plan (target launch 2023)
• Monitor progress of the pilots planned/launched during this reporting periods
• Support the relaunch of the Third Sector forum
• Explore opportunities to develop a universal method of capturing outcome information.   
Page 221 of 250

Page 222

Page 222 of 250

Page 223

Appendix 2
Glossary of Terms 
AfC Action for Children
BBV Blood Borne Virus
CARS Custody Arrest Referral Service
CATH Churches Action for The Homeless
CJOIP Community Justice Outcomes Improvement Plan
CJ Community Justice
CJ&SP Community Justice and Safety Partnership
CJSW Criminal Justice Social Work
COPFS Crown Office and Procurator Fiscal Service
CPA Care Program Approach
CPO Community Payback Order
CSCS Construction Skills Certification Scheme
DTTO Drug Treatment and Testing Order
DWP Department of Work and Pensions
DV Domestic Violence
ESF European Social Fund
HMP Her Majesty’s Prison
HRARG High Risk Adult Review Group
I-DART Integrated – Drug Alcohol and Recovery Team
IEP Injecting Equipment Provision
LDP Local Delivery Plan
MAPPA Multi Agency Public Protection Arrangements
MARAC Multi Agency Risk Assessment Conference 
MOG MAPPA Operational Group
NHS National Health Service
OPIF Outcomes Performance Improvement Framework
OST Opiate Substitution Therapy
OWLS One-stop Women's Learning Service
PIP  Partnerships Interventions and Preventions
PK  Perth and Kinross
PKAVS Perth and Kinross Association of Voluntary Service
PKC Perth and Kinross Council
RASAC Rape and Sexual Abuse Centre
RTITB Road Traffic Industry Training Board 
SARA-v3  Spousal Assault Risk Assessment-Version 3
SCT Safer Communities Team
SFRS Scottish Fire and Rescue Service
SG  Scottish Government
SHANARRI Safe, Healthy, Achieving, Nurtured, Active, Respected, Responsible
SOG Strategic Oversight Group
SPS Scottish Prison Service
SNSA Strategic Needs and Strengths Assessment
TCA Tayside Council on Alcohol
ToR Terms of Reference
VAWP Violence Against Women Partnership 
UWT Unpaid Work Team 
8
Page 223 of 250

Page 224

Page 224 of 250

Page 225

PERTH AND KINROSS COUNCIL 
Housing And Communities Committee 
25 January 2023 
TAYSIDE MAPPA ANNUAL REPORT 2021-22
Report by Executive Director (Education and Children’s Services)
(Report No. 23/12)
1. PURPOSE
1.1 This report introduces the Tayside Multi-Agency Public Protection
Arrangements (MAPPA) Annual Report for 2021-22.
2.        RECOMMENDATION
2.1 It is recommended that the Committee: 
• Notes and endorses the Tayside MAPPA Annual Report 2021-22; and 
• Request that the Executive Director (Education and Children’s Services)
brings forward future Annual Reports to Committee. 
3.  STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Background
• Section 5:  MAPPA Annual Report 2021-22
• Section 6:  Conclusion
• Appendices 
4.  BACKGROUND 
4.1 The Management of Offenders etc. (Scotland) Act 2005 introduced a statutory
duty on Responsible Authorities (local authorities, Scottish Prison Service
(SPS), Police Scotland and Health Boards) to establish joint arrangements for
the assessment and management of the risk posed by certain offenders who
constitute a risk of harm to the public.  The Responsible Authorities are
required to keep these arrangements under review and publish an annual
report.   
4.2 The development of MAPPA in 2007 introduced a consistent approach to the
management of certain high-risk offenders, which includes Registered Sex
Offenders (RSO); Restricted Patients (RPs) since 2008 and Category 3
offenders (violent) since 2016.  The principal purpose of MAPPA is to secure
public safety and reduce serious harm. 
9
Page 225 of 250

Page 226

4.3 MAPPA is supported by the Violent and Sex Offender Register (ViSOR) which
is a national IT system.  The main function of which is to facilitate inter-agency
communication and ensure that the Responsible Authorities contribute, share
and store critical information for the management of MAPPA offenders. 
4.4 Local MAPPA activity is overseen by the Tayside Strategic Oversight Group
(SOG).  The SOG not only provides oversight, but leadership, in respect of
policy and procedures, thereby ensuring robust governance, performance
monitoring and quality assurance.  The Tayside SOG traditionally met
quarterly, however, given the restrictions of the Covid pandemic, meetings
have been every six weeks.  This has allowed for close monitoring and
information sharing of a continually evolving situation while ensuring statutory
duties and functions were met in the monitoring and management of
offenders. 
4.5 The Tayside MAPPA SOG members are also represented on their respective
local public protection groups.  In Perth and Kinross, this includes the
Protecting People Co-ordinating Group (PPCG) and Chief Officers Group
(COG).  This ensures that there is a clear strategic link to both the MAPPA
Co-ordinator and the Independent Chair of the SOG. 
5.  MAPPA ANNUAL REPORT 2021-22 
5.1 The MAPPA Annual Report 2021-22 covers the period from 1 April 2021 to               
31 March 2022.  As of 31 March 2022, there were 356 MAPPA offenders in
Tayside, of which, 121 were at liberty in Perth and Kinross.  The figure for
Perth and Kinross was a small decrease of 5 offenders compared to the same
reporting point in the previous year, and a small decrease was also noted in
Angus, with Dundee reporting no increase or decrease.   
5.2 During the reporting year 2021-2022, the Covid pandemic was still a
significant factor affecting business and the delivery of services across
councils and other Responsible Authorities.  As we emerged from the
pandemic, an increase in regular face to face appointments with offenders
became possible. 
5.3 Microsoft Teams has proved to be a preferred method for facilitating
professionals’ meetings, including MAPPA meetings, even after the end of the
pandemic, as it allows more effective use of resources in terms of staff time
and travel. 
6. CONCLUSION 
6.1      The management of risk within the community presents many challenges and
impacts on a number of agencies across organisational boundaries, and most
importantly, communities themselves.  While it is not possible to entirely
eliminate risk, the agencies within Tayside have always worked collaboratively
and in partnership to manage those individuals subject to MAPPA and who
may present a significant risk to the public.   
6.2 This reporting year, as with the previous one, has highlighted a particular set
of challenges in the ability to deliver MAPPA and ensure public safety. 
Page 226 of 250

Page 227

Although the collaboration and co-production between Responsible
Authorities has been tested, service delivery has adapted and not diminished. 
This is a testament to the strength of the partnerships which exist in Perth and
Kinross and across public protection agencies.  In addition, the SOG has
adapted to the changed environment while continuing to maintain its focus on
reviewing and improving standards.  This ethos is also reflected in the public
protection arrangements in Perth and Kinross and will serve to inform the
future safety measures for our communities and citizens. 
Author
Name Designation Contact Details 
Derek Mortimer
Acting Service
Manager, Criminal
Justice Social Work
Service
ECSCommittee@pkc.gov.uk 
01738 475000 
Approved
Name Designation Date
Sheena Devlin  Executive Director
(Education and Children’s
Services)
22 December 2022 
Page 227 of 250

Page 228

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes/None
Community Plan/Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  n/a
Workforce n/a
Asset Management (land, property, IST) n/a
Assessments  
Equality Impact Assessment n/a
Strategic Environmental Assessment n/a
Sustainability (community, economic, environmental) n/a
Legal and Governance  n/a
Risk n/a
Consultation 
Internal  n/a
External  Yes
Communication 
Communications Plan  n/a 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This section sets out how the proposals relate to the delivery of the Perth and
Kinross Community Plan/Single Outcome Agreement in terms of the following
priorities: 
(i) Giving every child the best start in life;
(ii) Developing educated, responsible and informed citizens;
(iii) Promoting a prosperous, inclusive and sustainable economy;
(iv) Supporting people to lead independent, healthy and active lives; and
(v) Creating a safe and sustainable place for future generations. 
This report relates to Objective No. (v).   
Corporate Plan 
1.2 This section sets out how the proposals relate to the achievement of the
Council’s Corporate Plan Objectives: 
(i) Giving every child the best start in life;
(ii) Developing educated, responsible and informed citizens;
(iii) Promoting a prosperous, inclusive and sustainable economy;
(iv) Supporting people to lead independent, healthy and active lives; and
(v) Creating a safe and sustainable place for future generations. 
This report relates to Objective No. (v).  
Page 228 of 250

Page 229

1.3 The report also links to the Education & Children’s Services Vision, Values
and Priorities in respect of the following key Priority area: 
• Safe and Protected 
2. Resource Implications 
Financial 
2.1 There are no financial implications arising from this report. 
Workforce 
2.2 There are no workforce issues arising from this report. 
Asset Management (land, property, IT) 
2.3 There are no asset management issues arising from this report. 
3. Assessments 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.   
3.1.1 The proposals have been considered under the Corporate Equalities Impact
Assessment process (EqIA) with the following outcome: 
(i) Assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals.  
3.2.1 However, no action is required as the Act does not apply to the matters
presented in this report.  This is because the Committee are requested to note
the contents of the report only and the Committee are not being requested to
approve, adopt or agree to an action or to set the framework for future
decisions. 
Sustainability 
3.3 Under the provisions of the Local Government in Scotland Act 2003, the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.  Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
Page 229 of 250

Page 230

• In the way best calculated to delivery of the Act’s emissions reduction
targets.
• In the way best calculated to deliver any statutory adaption programmes.
• In a way that it considers most sustainable. 
3.3.1 There are no sustainability issues in respect of this report. 
Legal and Governance 
3.4 This report contains no issues which would have a legal or governance impact
on the Council. 
3.5 There are no implications for the Council’s Scheme of Administration in this
report. 
Risk 
3.6 There are no issues of risk arising from the proposals in this report. 
4. Consultation 
Internal 
4.1 None. 
External 
4.2 The Tayside MAPPA Co-ordinator has approved the report. 
5. Communication 
5.1 Not relevant to this report. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (and not containing confidential or exempt information)
were relied on to a material extent in preparing this report. 
3. APPENDICES 
3.1 Appendix 1 – Tayside MAPPA Annual Report 2021-2022 
Page 230 of 250

Page 231

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
1
Annual Report
2021-2022
9
Page 231 of 250

Page 232

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
2
Page 232 of 250

Page 233

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
1
INTRODUCTION
I am pleased to introduce the Tayside Multi Agency Public Protection
Arrangements (MAPPA) Annual Report on behalf of the Tayside MAPPA
Strategic Oversight Group (SOG).
The purpose of MAPPA is public protection and reducing the risk of serious
harm.  MAPPA brings together key partners to provide an integrated way of
working and the SOG provides leadership of multi-agency arrangements
across the region.
Our SOG has membership from Dundee City, Perth and Kinross and Angus
Council Social Work and housing departments, NHS Tayside, Police Scotland
and The Scottish Prison Service.
It is supported by an Operations Group which concentrates on operational
delivery, training, development, self-evaluation, data analysis and continuous
improvement. Members routinely reflect on arrangements with a focus on
ensuring public safety is paramount.
Over the coming year the SOG will work with partners to formulate a
communications and engagement strategy.  The strategy will cover all
forms of communication but in particular seek to improve the knowledge of
MAPPA and its effectiveness across all sections of society.  The management
of sex offenders in the community relies on services being able to monitor
offenders through effective engagement, visits and supports.  MAPPA
services risk assess offenders housing and their contacts with the community
so that the risk to the public is minimised. 
Alan Small
Tayside MAPPA SOG Independent Chair
Page 233 of 250

Page 234

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
2
TAYSIDE MAPPA
Multi Agency Public Protection Arrangements (MAPPA) are a set of
arrangements to manage the risk posed by the most dangerous offenders
under the provision of the Management of Offenders etc (Scotland) Act 2005.
In Tayside the Responsible Authorities continue to be committed to work
together to prevent the public, residing in our communities becoming victims of
serious harm.
The responsible authorities of Tayside are:
• Dundee City Council
• Perth & Kinross Council
• Angus Council
• Police Scotland
• Scottish Prison Service
• NHS Tayside
MAPPA
MAPPA is the process in which those who pose a significant risk are managed
and it brings agencies together to help manage that risk. 
To be managed under the auspices of MAPPA a person must be
• Registered Sex Offenders (RSOs) – are those individuals who are required
to comply with the sex offender notification requirements (SONR) as set
out in Part 2 of the Sexual Offences Act 2003.
• Restricted Patients, - are patients subject to a compulsion order with
restriction order, a hospital direction or a transfer for treatment direction;
that is patients who are subject to special restrictions under the Mental
Health (Care and Treatment) (Scotland) Act 2003.
• Other Risk of Serious Harm Individuals – these are individuals who are
not required to comply with the SONR or who are not Restricted Patients;
but who by reason of their conviction; are considered by the Responsible
Authorities to be
• persons who may cause serious harm to the public at large. These
individuals are known as Category 3 offenders.
Page 234 of 250

Page 235

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
3
When a person becomes subject to MAPPA they will be managed within one of
3 levels,
• Level 1:Routine Risk Management; used in cases where the risk posed
by the offender can be managed by one agency without actively or
significantly involving other agencies,
• Level 2: Multi-Agency Risk Management; used where the active
involvement of more than one agency is required to manage the offender
and their risk is deemed high or very high.
• Level 3: Multi Agency Public Protection Panels (MAPPP); used for the
management of the critical few where the plan requires close co-operation
at a senior level due to the complexity of the case and/or because of
the unusual resource commitment it requires, or the case is exceptional
because of the likelihood of media scrutiny and/or public interest in the
management of the case is high.
Cases should be managed based on the most current risk assessment, analysis
of risk of serious harm and the Risk Management Plan (RMP). Risk assessments
and Risk Management Plans are crucial to ensuring offenders are supervised
effectively with the appropriate measures in place to manage the risk they pose.
More information on the management levels can be found in the MAPPA
Guidance 2022.
Page 235 of 250

Page 236

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
4
DUNDEE CITY COUNCIL 
During the pandemic in Dundee Friarfield House remained open with continued
implementation of safe systems of work.  Client interviews remained by
appointment only with all clients seen on a face-to-face basis in accordance with
National Outcomes and Standards and locally implemented Minimum Practice
Requirements.
All people subject to MAPPA were supervised and supported through a
combination of office appointments and announced and unannounced home
visits. PPE was used as required and telephone contact was made with anyone
testing positive and in isolation. In crisis situations, people were given an
immediate appointment to attend the office.  
Through the MAPPA case review process, monthly audits and monthly staff
supervision, it has shown all people were supervised appropriately. In addition,
all accredited programme work continued to be delivered without any
extensions to Orders being required. The team worked creatively with other
services to promote a holistic approach.
Compliance levels continued to be high, with people mostly attending
appointments where required and few instances of re-offending.  Breach reports
are submitted promptly to allow the Parole Board to consider revocation of
Licence.
Alongside staff supervision (both formal and informal), staff in the Public
Protection Team also have the opportunity on a 3 monthly basis to attend
supervision with an external counsellor. They can also take cases to the Complex
Case Discussion with David Briggs, Forensic Clinical Psychologist.
Case Study
Peter was released on licence in Nov 2019. At that time, he was initially
managed at MAPPA Level 3. Despite the pandemic, he was seen on a weekly
basis for office appointments and home visits and engaged positively with
his supervising officer and his Sex Offender Policing Unit officer. Through his
engagement he evidenced his learning from the programmes completed in
custody and continued to engage in an open and honest manner with the
professionals involved.
In 2020 he secured his own tenancy, strengthened family relationships and
got himself a dog.  In 2021 he secured training through the Jobcentre and has
accessed various temporary jobs in construction. He remains motivated to avoid
offending and is now managed by MAPPA at Level 1.
Page 236 of 250

Page 237

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
5
Moving forward, all clients are now able to attend Friarfield House both with
and without appointment.  Following the introduction of hybrid working
arrangements, staff work in the co-located office to promote an integrated
approach with Police Scotland and NHST, whilst also carrying out key roles at
home. Accredited groupwork programmes have also resumed with 5 people in
each group. 
PERTH & KINROSS COUNCIL
Access to services continued to be curtailed for clients during 2021/2022
because of the restrictions brought about by COVID-19.  During 2021/2022 staff
gradually returned to office working on certain days of the week. This was on
a rota basis as we still had to ensure physical distancing measures and comply
with other covid restrictions within the workplace.  This did allow workers to
gradually increase the frequency of face to face meetings with clients and we
did also arrange office based appointments for some clients with the social
worker in attendance “virtually” over a Microsoft Teams call.  This was particularly
useful when providing Tay Project or MFMC sessions whereby we did not have
to have multiple workers in a room with a client.  The service slowly transitioned
to face to face appointments between lockdowns but had to be flexible and
revert to more restrictive contact as guidance fluctuated and further restrictions
were imposed. The final restrictions were lifted towards the end of the reporting
year 2021/2022 and a greater proportion of appointments with clients resumed
as face to face.
Microsoft Teams has proved to be a preferred method for facilitating meetings
including Multi-Agency Public Protection Meetings (MAPPA) even after the end
of the pandemic as it allows more effective use of resources in terms of staff
time and travel.
Case Study
During this year we had a MAPPA level 3 offender released into the community
at the end of his sentence and subject to an extended sentence supervision
period.  An Intensive Support Package was put in place with 24-hour
monitoring and supervision.  This arrangement worked well from the release
date in November 2021 until the end of the reporting year.  The arrangement
demonstrated good interagency working and communication.  The outcome
was disappointing in that the offender breached his licence conditions in May
2022 and was recalled to custody but this also proved that the package was
necessary for public protection and did serve that purpose and minimise the
effect and nature of the breach.
Page 237 of 250

Page 238

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
6
ANGUS COUNCIL 
This past year has seen on-going challenges due to COVID, however all service
users were seen on a face to face basis as per their risk management plans.
COVID saw MAPPA meetings being held online and new processes were
established and embedded very quickly. All involved have found this a much
more efficient and effective way (reduction in travel and time) of carrying
out such meetings and all parties seem keen for this to continue. MAPPA
partnerships remain strong in Angus with all agencies working well together.
Four workers from the Public Protection Team have undertaken and passed the
CPORT training for men who commit indecent images offences. Initial thoughts
are this may lead to a more proportionate response.
Partners have attempted to streamline ERA processes and this appears to be
working well. We will continue to monitor this and Housing, Police and Justice
services will continue to meet to review this.
TAY PROJECT
The Tay Project is made up of specially trained Social Workers who are
responsible for the delivery of assessments and interventions for men who
commit sexual offences and are subject to a Community Payback Order or
License Conditions across Tayside.
The interventions are delivered through an accredited programme called
Moving Forward Making Changes (MFMC). MFMC is designed to meet the
treatment needs of male sexual offenders who have committed either sexual
offences, or offences with a clear sexual element. The programme is for medium
to very high risk offenders over the age of 18 years.
The MFMC programme is a cognitive behavioural programme that utilises an
integrated theory of change approach. The aim of the programme is to reduce
reoffending of men convicted of sexual/sexual motivated offences. The length of
time an offender will spend in treatment will depend upon their risk and needs
which will inform the treatment formulation. This will be individualised for each
offender. The programme is delivered in a group setting or on a 2:1 with the
individual requiring treatment.
Page 238 of 250

Page 239

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
7
HOUSING
Housing partners have continued to operate effectively and continued to
secure housing when needed despite pressures experienced as a result of the
pandemic, workforce issues, increasing costs and material shortages impacting
on repairs services and increasing void and turnover times. However identifying
suitable accommodation is likely to become increasingly more challenging in
a context of the cost of living crisis, constrained resources, the humanitarian
efforts to accommodate refugees and deliver the more recent Ukrainian
schemes, as well as the risks surrounding the potential increase in homelessness
presentations when the schemes come to an end.
New statutory requirements are also expected to be implemented in 2023 on all
public bodies and landlords to prevent homelessness, particularly by asking and
acting on a risk of homelessness, as well as responsibilities relating to strategic
and joint planning. The proposed Prevention of Homelessness duties are based
on the following overarching ‘foundational principles’:
• Responsibility to prevent homelessness should be a shared public
responsibility and not rely solely or primarily on the homelessness service.
• Intervention to prevent homelessness should start as early as possible.
In many cases this will be before issues have escalated to a point where
homelessness appears imminent.
• People facing homelessness should have choice in where they live and
access to the same range of housing outcomes as members of the
general public, with appropriate protections to mitigate further risk of
homelessness. Housing outcomes should be comparable across the
prevention and homelessness duties.
The MOG and SOG will respond to any requirements arising from the
implementation of the new Housing Bill and potential pressures arising from
the cost of living crisis and humanitarian schemes and respond appropriately to
mitigate any risks that arise.
Page 239 of 250

Page 240

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
8
POLICE SCOTLAND 
During the reporting period, the impact of the pandemic continued to be felt,
however face to face offender home visits continued, with appropriate Covid 19
risk assessment.
Professional meetings were held almost exclusively online.  This process was
embedded quickly and worked well with the positive outcome of eradicating
travelling and freeing up valuable time. 
We are aware that online crime increased during the pandemic and with that,
online sexual abuse and cases involving the possession of indecent images of
children.  It is anticipated that demand on policing will continue to increase in
complexity in terms of cyber enabled crime, however our cyber strategy aims to
ensure specialist officers and staff have the skills, tools and support to respond
to this threat. 
The Criminal Justice System slowed, with courts unable to operate at normal
capacity, however other measures are available to mitigate risk prior to
sentencing including remand, bail conditions and civil orders.
Protecting vulnerable people from harm and the management of registered
sex offenders continues to be a national policing priority.  Police Scotland will
closely monitor this critical area of business to ensure that resourcing levels are
maintained in accordance with the nationally recognised Lead Investigator /
Offender ratios.
Table 4: Restricted Patients
NHS TAYSIDE
As with all organisations that are within the MAPPA portfolio, this has remained a
challenging year due to the ongoing COVID-19 pandemic and remobilisation of
services as a result of this.
NHS Tayside has been at the forefront of care delivery locally and the Public
Protection agenda has remained a priority for the organisation. Over the last
year, NHS Tayside has continued to build on the foundations laid in the previous
year in relation to the Public Protection framework which has seen all aspects
of this business progress and prioritised with the ongoing strengthening of
the Public Protection Executive Group which is chaired by the Executive Nurse
Director. MAPPA falls within this framework and is part of the core public
protection agenda within NHS Tayside.
Page 240 of 250

Page 241

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
9
NHS Tayside contributes to a range of oversight activities as a member of the
MAPPA Strategic Oversight Group and continues to work with our partners to
enhance the operation of MAPPA.
The MAPPA Health Liaison Officer (MHLO) role has remained an essential post
throughout COVID-19 which has ensured that NHS Tayside has been able to
support joint working with our key partners and fulfil our duty to co-operate with
a focus on risk management and continued protection of the public.
The MHLO has continued to provide support and advice across NHS Tayside
in relation to risk assessment and risk management of MAPPA clients as well
as supporting learning and developing activities and the broader adult /
public protection agenda within NHS Tayside as part of our multiagency
responsibilities.
HMP CASTLE HUNTLY
HMP Castle Huntly was affected in many ways by the Covid pandemic. However,
a recovery plan is in place and the prison is starting to make progress in
ensuring opportunities are once again available for those in our care. This
includes outside activities with the PEI’s which include cycling and football in the
community.
Although admissions ceased for a number of months, they have started to rise
again slowly, and we are seeing the positive outcomes for people, such as the
connections with the community, and the benefits this brings.
During 2020, normal monthly multi-disciplinary MAPPA meetings to oversee
each case were suspended due to a lack of community access and movement,
and Risk Management Team (RMT) meetings remained the platform to manage
them.
The HMP Castle Huntly monthly MAPPA meeting recommenced in March 2021. 
Meetings were held on 4 May and 2 August, 2022. This meeting remains a good
practice piece of work to ensure HMP Castle Huntly manages and reviews all
aspects of the MAPPA prisoners plan, and is not a decision-making forum.
This chart shows the total of MAPPA RSO’s and Category 3 people within HMP
Castle Huntly at present.
Page 241 of 250

Page 242

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
10
HMP PERTH
HMP Perth has continued to operate with very few interruptions to regular
MAPPA business during the period of the pandemic and this has continued as
we emerge from the COVID restrictions.  The Integrated Case Management
(ICM) team continue to enjoy regular correspondence and assistance from
the MAPPA Co-ordinator, the local Sex Offender Policing Units (SOPU) and
Community based Social Work within Tayside.
The introduction of MAPPA meetings by Teams continues to have a positive
impact to the process. This has allowed senior staff at Unit Manager Level and
above to attend meetings without any major disruption to their working day.
The virtual platform has been positive and has not disrupted the ability of
sharing information.
SOPU staff have continued to be involved in pre–release ICM case
conferences and again the use of telephone case conferences has aided this
process.
Numbers within custody from Tayside have remained relatively constant
throughout the report year, between August 2021 and August 2022, the
numbers have averaged between 54 and 64. 
Page 242 of 250

Page 243

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
11
An emerging issue, which has brought some challenges, are individuals returning
to the community when the court backdates their sentence due to time served on
remand. There have been a number of instances recently where those individuals
who have spent a longer than usual period on remand are released within days,
weeks or even immediately on return from court.
This has proven to be challenging over this report year and in order to mitigate
the associated risks this has posed, we have provided the proposed court
dates to MAPPA administration for their information and action. The sharing of
this information has worked well over the report period and has allowed the
necessary planning to take place prior to release.
MAPPA CO-ORDINATION
As the challenges of Covid continued throughout 2021 and into 2022 MAPPA
meetings remained to be held via MS Teams across the three local authorities. 
By using MS Teams members have been able to join meetings without travel
and it has been excellent for time management. It has been noted that greater
attendance of all agencies has occurred by using MS Teams.  As we go forward
MS Teams will continue to be utilised for future MAPPA meetings.
The MAPPA Co-ordinator and Chair of the Strategic Oversight Group (SOG) have
continued to attend national meetings and each local authority Chief Officer
Group meetings allowing for national themes to be shared locally.
The formation of SOG sub groups, Self-Evaluation Group, MOG and Training
Group, SCR review group, has allowed for the examination of MAPPA activity
throughout the year.
Page 243 of 250

Page 244

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
12
STATISTICAL INFORMATION
As of 31 March, 22, there were 356 Registered Sex Offenders managed in the
community in Tayside, a decrease of 8 offenders on the previous year.  Of the
356 there were 112 (31%) subject to statutory supervision requirement with
Community Justice Social Work and managed jointly with Police Scotland, Sex
Offender Policing Unit.
The number of offenders managed in each local authority area is detailed below;
ANGUS  95  (a decrease of 3 on the previous year)
DUNDEE  140 (the same as the previous year)
PERTH & KINROSS  121 (an decrease of 5 on the previous year)
In March 2016, MAPPA was extended to include Category 3 offenders, who are
considered to be High risk individuals subject to a statutory order and require
multi-agency management. This year 3 individuals have been considered and
managed under the Category 3 process.
In this reporting year there has been 75 new offenders convicted and made
subject to MAPPA managements. With Dundee seeing the biggest increase.
ANGUS  22
DUNDEE  32
PERTH & KINROSS  21
However, during the same reporting period there has been 64 offenders
archived. Archiving occurs when an offender has reached the end of their term
of registration or they have died.
ANGUS  17
DUNDEE  25
PERTH & KINROSS  22
Throughout this past year we have continued to utilise MS Teams for MAPPA
meetings 369 Level 1 meetings, 108 level 2 meetings and 6 Level 3 meetings
were held, thus ensuring business as usual for the management of the offenders
within our communities.
Page 244 of 250

Page 245

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
13
WHAT WE SAID WE WOULD DO IN 2021/2022
The following priorities were identified for 2021/2022:
Communication plan to be agreed and implemented
The Scottish Government has updated the MAPPA Engagement Strategy, the
Tayside SOG will examine this to ensure that the strategies in Tayside match
that designed by the Government.
Progression of training programme
A Training Group has been identified and are currently examining the
revised MAPPA Guidance and putting together a training programme for the
operational staff involved in MAPPA.  Training events will occur across the
three local authorities with the focus initially being on MAPPA Chair training
On publication of the reviewed MAPPA Guidance ensure local practice is up
to date the Self Evaluation group will look to extend self-evaluation work,
build a calendar and consider appropriate audits.
The Self Evaluation group continue to meet and the performance report
has now become routine business and statistical information is produced
monthly, the calendar of audits has also begun with each agency carrying out
their respective audits with the results being shared to develop any learning
outcome.
Page 245 of 250

Page 246

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
14
GOING FORWARD 2022/2023
The Tayside MAPPA SOG Strategic Plan 2020-2023 sets out that we will
monitor and review the Tayside MAPPA Environmental Risk Assessment (ERA)
process and ensure that risk assessments are completed within the Scottish
Government’s National Accommodation for Sex Offender’s minimum standards.
The Tayside MAPPA housing leads agreed a monitoring framework in April 2022
and will report to the Tayside MAPPA MOG and SOG at the end of each quarter
on:
a. Number of initial and renewal ERAs requested each month
b. % of ERAs completed in timescale
c. % of ERA’s completed out with timescale
d. % of ERAs assessed as suitable
• Examine National communication strategy and develop a Tayside
document
• Maintain links with the National MAPPA groups ensuring that any new
practice is delivered and embedded locally
• Work with partners to agree a revised information sharing agreement
following recent national discussions between the Responsible Authorities. 
This will include which systems and other means of information sharing
are used and the potential to implement a new information management
system MAPPS being developed by the Home Office.
Page 246 of 250

Page 247

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
15
Page 247 of 250

Page 248

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
16
Page 248 of 250

Page 249

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
17
Page 249 of 250

Page 250

Multi Agency Public Protection Arrangements  Annual Report 2021-2022
18
Designed by Communications, Dundee City Council SM/10/22
MAPPA Co-ordinator
Friarfield House
Barrack Street
Dundee, DD1 1PQ
Tel: 01382 435518
Fax: 01382 435080