Page 1

Argyll and Bute Council  
Development and Economic Growth       
This Supplementary report is a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit (ECDU) Section 36 consultation on the
proposed Rowan wind farm on Land Approximately 4.5km North West of Tarbert, Argyll
& Bute
_________________________________________________________________________     
Reference No: 22/00385/S36     
Applicant:       The Scottish Government on behalf of EnergieKontor UK Ltd
Proposal:  Electricity Act Section 36 consultation relevant to Rowan Wind Farm  
Site Address:  Land Approximately 4.5km North West of Tarbert, Argyll & Bute  
________________________________________________________________________   
SUPPLEMENTARY REPORT NO. 3 
1. INTRODUCTION 
This proposal was originally presented to committee on the 28th of September 2022. Three
reports were considered: the Report of Handling; and Supplementary Reports 1 and 2. The
Committee agreed on behalf of the Council, as Planning Authority, to object to this proposal
for the reasons detailed in the Report of Handling. The Energy Consents Unit was notified of
this decision accordingly. The consultation with the Energy Consent concluded and because
of the objection from the Planning Authority, in terms of the Electricity Act, if that objection is
not withdrawn, the Scottish Ministers must cause a Public Inquiry to be held. 
2. RE-CONSULTATION 
The Energy Consents Unit reconsulted the Planning Authority on the 14th of December 2022.
The reason for this being that Revised Draft NPF4 (National Planning Framework 4) had been
laid in Parliament. If approved by Parliament and adopted by Scottish Ministers, the draft as
laid NPF4 will become part of the Development Plan. As the Planning Authority’s consultation
response of 28th September 2022 was provided prior to the NPF4 being laid, the Scottish
Government would like to give the Planning Authority the opportunity to provide further
comment on NPF4. They have advised that there is no need to repeat comments previously
provided. The Scottish Government are interested in the Councils view on the implications of
this document and in particular sections on: Natural Places (page 40) and Energy (pages
53/54). 
As this S36 consultation was not a delegated item in terms of the Council’s Constitution,
Officers do not have the authority to give the Council’s view in relation to NPF4 without first
presenting a report to PPSL committee. This report therefore seeks Members’ agreement on
Officers’ further consultation response to the ECU. 
3. STATUS OF NPF4 
The status of NPF4 has changed since the Council was reconsulted and is likely to change
again prior to the committee considering this report. NPF4 2022, received final approval from
the Scottish Parliament on 11 January 2023 and awaits adoption by the Scottish Ministers. It

Page 2

is understood that NPF4 2022 will be adopted on 13th February 2023. At that time, it will
replace National Planning Policy 3 (NPF3) and Scottish Planning Policy 2014 (SPP). and will
become the national element of the statutory development plan – for all parts of Scotland. This
report has, therefore, been prepared on the assumption that NPF4 2022 has been adopted by
the Scottish Government and SPP and NPF3 have been superseded. NPF4 should now be
given significant weight in the decision-making process. 
4. ASSESSMENT AGAINST NPF4 
As requested by the Scottish Government, Officers recommend the following views on the
implications of NPF4 and sections on: Natural Places (page 40) and Energy (pages 53/54)
are relayed to the ECU as the Planning Authority’s position on this application. 
The Spatial Strategy in NPF4 sets out that we are facing unprecedented challenges and that
we need to reduce greenhouse gas emissions and adapt to future impacts of climate change.
It sets out that that Scotland’s environment is a national asset which supports our economy,
identity, health, and wellbeing. It sets out that we have already taken significant steps towards
decarbonising energy and land use, but choices need to be made about how we can make
sustainable use of our natural assets in a way which benefits communities. The Spatial
Strategy reflects legislation in setting out that decisions require to reflect the long-term public
interest. However, in doing so it is clear that we will need to make the right choices about
where development should be located ensuring clarity is provided over the types of
infrastructure that needs to be provided and the assets that should be protected to ensure
they continue to benefit future generations. The Spatial Priorities support the planning and
delivery of sustainable places, where we reduce emissions, restore, and better connect
biodiversity; liveable places, where we can all live better, healthier lives; and productive
places, where we have a greener, fairer, and more inclusive wellbeing economy. 
Eighteen national developments support this strategy. National developments will be a
focus for delivery, as well as exemplars of the Place Principle, placemaking and a Community
Wealth Building (CWB) approach to economic development. The type of development subject
to this application is identified generically as a national development of “Strategic Renewable
Electricity Generation” given it has the capacity to generate and store more than 50MW. There
is in principle support for national scale developments as they have been identified of national
importance in the delivery of Scotland’s Spatial Strategy. However, any project identified as a
national development requires to be considered at a project level to ensure all statutory tests
are met. This includes consideration against the provisions of the Development Plan, of which
National Planning Framework 4 is now a part. 
NPF4 - Policy 11: Energy – The intention of Policy 11 is to encourage, promote and facilitate
all forms of renewable energy development onshore and offshore (including wind farms and
battery storage). The policy outcome is expansion of renewable, low-carbon and zero
emissions technologies. Policy 11 sets out that development proposals for all forms of
renewable energy (including wind farms) will be supported. This policy continues to set out
that proposals will only be supported where they maximise net economic impact, including
local and community socio-economic benefits such as employment, associated business and
supply chain opportunities. Furthermore, applications need to demonstrate how, through
project design and mitigation, the impact on a range of considerations has been addressed.
This allows for consideration of matters related to impacts on communities and individual
dwellings in relation to amenity; landscape and visual impact; public access; aviation and
defence interests; telecommunications; traffic; historic environment; biodiversity (including
birds); impacts on trees; decommissioning; site restoration; and cumulative effects.

Page 3

While the weight to be given to each of the considerations in Policy 11 is a matter for the
decision maker, NPF4 is clear that significant weight will require to be placed on the
contribution of the proposal to renewable energy generation targets and on greenhouse gas
emission reduction targets. In relation to landscape and visual impacts it advises that where
impacts are localised and / or appropriate design mitigation has been applied such effects will
generally be considered acceptable. This support is not however to the exclusion of other
factors, a balance still requires to be struck in terms of the impact of development. NPF4 must
be read as a whole, and detailed consideration given to linked policies, such as Policy 4:
Natural Places, considered below. Project design and mitigation needs to show how impacts
(both individual and cumulative) on numerous receptors, including the natural environment
have been addressed.
NPF4 Policy 4: Natural Places – The intention of Policy 4 is to protect, restore and enhance
natural assets, making the best use of nature-based solutions. The policy outcome is that
natural places are protected and restored, and natural assets are managed in a sustainable
way that supports and grows their essential benefits and services. Of relevance to this
proposal is policy 4(a) which sets out that development proposals which by virtue of type,
location or scale will have an unacceptable impact on the natural environment will not be
supported.
Landscape & Visual Impact (including cumulative) - As detailed in the Report of Handling, and
Supplementary Reports 1 and 2, it is considered that the proposed development will have
significant adverse landscape and visual impacts (including cumulative) which will have an
unacceptable impact on the environment. Following the introduction of NPF4, this matter has
been revisited and assessed in the context of this new policy document. To help with this,
further advice has also been sought from the Councils Landscape Consultant. The outcome
being that a different view has been reached in regard to the Landscape & Visual Impact
(including cumulative) which focuses on the regional impacts of the proposal. 
The proposed development site lies within the Knapdale Upland Forest Moor Mosaic
Landscape Character Type (LCT) which covers much of the Knapdale area between West
Loch Tarbert and the southern edge of the Knapdale National Scenic Area. This landscape
has a simpler landform in the south-west but is complex and craggy in the north-east.
This proposal, which comprises very large turbines of up to 200m, would be sited in a basin
which reduces its prominence and intrusion seen from Loch Fyne and from the settled eastern
coastal fringes of this loch. The containment provided by landform is however diminished in
views from the south around West Loch Tarbert where turbines would be visible in closer
proximity and where their scale would be more appreciated due to greater visual exposure
and because they would be seen in close conjunction with the smaller scale settled loch
fringes. The proposal would significantly affect the character of West Loch Tarbert and views
from the A83, the Islay ferry route, settlement and recreation routes on the south-eastern
shores of the loch. Proposed aviation lighting would increase the duration of these significant
adverse effects. While it is acknowledged that the extent of these significant adverse
landscape and visual effects is confined to the waters and south-eastern shores of West Loch
Tarbert and the proposal is well screened and/or distant from other sensitive locations, there
is concern about the effects on the tourist routes of the A83 and the Islay ferry which are
regionally important within Argyll and Bute. 
The potential cumulative effects of visible aviation lighting on character and views are also a
concern given the number of recent applications for turbines >150m in Argyll & Bute requiring
such lighting, including application stage: Narachan, Earraghail, Clachaig Glen and this
proposal although we consider that these effects could be mitigated to an acceptable degree
by the adoption of an Air Detection Lighting System which would significantly reduce the
duration of visible night-time lighting.

Page 4

The principal concern is, however, the cumulative landscape and visual effects likely to occur
with the application-stage Sheirdrim wind farm. If the Sheirdrim proposal is consented on
appeal, it is considered that the addition of the Rowan proposal would result in significant
combined cumulative landscape and visual effects on the West Loch Tarbert area with a
substantial increase in the extent of major adverse effects. It is considered that the nature of
these significant effects on landscape and visual interests would be of regional importance,
affecting not just the tourist routes of A83 and the Islay Ferry but also settlement and recreation
routes including views to and from the nationally important scheduled monument of Dun Skeig. 
In conclusion, it is considered that the cumulative landscape and visual impact of this proposal
with Sheirdrim is unacceptable, and the proposed development is contrary to the provisions
of Policy 11 – Energy of National Planning Framework 4 (NPF4)  and Policy 4 – Natural Places
in this regard.
Aviation Impact - As detailed in the Report of Handling, and Supplementary Reports 1 and 2,
it is considered that the proposed development will have an adverse impact on aviation due
to unresolved aviation objections from National Air Traffic Services (NATS) and Glasgow
Prestwick Airport (GPA). Following the introduction of NPF4, this matter has been revisited
and assessed in the context of this new policy document. Policy 11 requires consideration to
be given to such matters. The Applicant has advised that these objections are unlikely to be
resolved before Committee. Consequently, it is considered that there is no need to alter the
Councils earlier reason for objection in this regard which includes a caveat that Argyll & Bute
Council would no longer object on the grounds of adverse aviation impact if NATS and GPA
withdraw their objections. 
In conclusion, as there are outstanding aviation objections it is concluded that the proposed
development is contrary to the provisions of Policy 11 – Energy of National Planning
Framework 4 (NPF4) in this regard. 
5. CONCLUSION & RECOMMENDATION
While NPF4 sets out that wind energy developments are to be supported, and significant
weight must be given to the global climate emergency and nature crises. This is not however,
blanket support without qualification, the support is in principle, and it is for the decision maker
to take account of all other relevant policies. In considering the appropriateness of the
development, while significant weight has been given to these matters, the cumulative
landscape and visual impact of this proposal with Sheirdrim and outstanding aviation
objections are considered to outweigh the benefits of the development in relation to
contribution towards energy targets and limited socio-economic benefits. It is clear from NPF4,
that whilst more weight must be given to the climate emergency, there is still not a policy
expectation that an adverse impact on the environment should be accepted as the price to
pay for the ability to satisfy these commitments. The natural environment also requires to be
seen as a finite resource worthy of protection. It must be recognised that such support should
only be given where justified. 
Having considered NPF4 it is recommended that the Council as Planning Authority continues
to object to this proposal for the revised reasons detailed below, and that the Scottish
Government be notified accordingly. Members should note that an objection from the Council
will instigate the requirement for a Public Local Inquiry to be held. 
6. RECOMMENDED REASONS FOR OBJECTION TO: 22/00385/S36 
1. Landscape & Visual Impact (including cumulative) 
The proposed development site lies within the Knapdale Upland Forest Moor Mosaic
Landscape Character Type (LCT) which covers much of the Knapdale area between West

Page 5

Loch Tarbert and the southern edge of the Knapdale National Scenic Area. This landscape
has a simpler landform in the south-west but is complex and craggy in the north-east. 
This proposal, which comprises very large turbines of up to 200m, would be sited in a basin
which reduces its prominence and intrusion seen from Loch Fyne and from the settled eastern
coastal fringes of this loch. The containment provided by landform is however diminished in
views from the south around West Loch Tarbert where turbines would be visible in closer
proximity and where their scale would be more appreciated due to greater visual exposure
and because they would be seen in close conjunction with the smaller scale settled loch
fringes. The proposal would significantly affect the character of West Loch Tarbert and views
from the A83, the Islay ferry route, settlement and recreation routes on the south-eastern
shores of the loch. Proposed aviation lighting would increase the duration of these significant
adverse effects. While it is acknowledged that the extent of these significant adverse
landscape and visual effects is confined to the waters and south-eastern shores of West Loch
Tarbert and the proposal is well screened and/or distant from other sensitive locations, there
is concern about the effects on the tourist routes of the A83 and the Islay ferry which are
regionally important within Argyll and Bute. 
The potential cumulative effects of visible aviation lighting on character and views are also a
concern given the number of recent applications for turbines >150m in Argyll & Bute requiring
such lighting, including application stage: Narachan, Earraghail, Clachaig Glen and this
proposal although we consider that these effects could be mitigated to an acceptable degree
by the adoption of an Air Detection Lighting System which would significantly reduce the
duration of visible night-time lighting. 
The principal concern is, however, the cumulative landscape and visual effects likely to occur
with the application-stage Sheirdrim wind farm. If the Sheirdrim proposal is consented on
appeal, it is considered that the addition of the Rowan proposal would result in significant
combined cumulative landscape and visual effects on the West Loch Tarbert area with a
substantial increase in the extent of major adverse effects. It is considered that the nature of
these significant effects on landscape and visual interests would be of regional importance,
affecting not just the tourist routes of A83 and the Islay Ferry but also settlement and recreation
routes including views to and from the nationally important scheduled monument of Dun Skeig. 
In conclusion, it is considered that the cumulative landscape and visual impact of this proposal
with Sheirdrim is unacceptable. 
Having due regard to the above it is concluded that the proposal will have significant
adverse cumulative landscape and visual impacts and is therefore inconsistent with
the provisions of: SG LDP ENV 14 –Landscape; SG 2 Renewable Energy; LDP STRAT 1
– Sustainable Development; LDP DM1 – Development within the Development
Management Zone; LDP 3 – Supporting the Protection, Conservation and Enhancement
of our Environment; Policy LDP 6 – Supporting the Sustainable Growth of Renewables;
LDP 9 – Development Setting, Layout and Design; of the Argyll & Bute Local
Development Plan; the Argyll & Bute Landscape Wind Energy Capacity Study 2017; the
Onshore wind policy statement and Policies 4 (Natural Places) and 11 (Energy) of
National Planning Framework 4 (NPF4) 
2. Aviation

Page 6

Argyll & Bute Council will assess development proposals with the aim of preventing
unnecessary dangers to aircraft. Policy requires that development is refused where it would
constrain the present and future operations of existing airports and airfields. 
National Air Traffic Services Safeguarding (NATS) have advised that an unacceptable
technical impact is anticipated, and they object. Glasgow Prestwick Airport advise that the
development raises aviation safety concerns which have an operational impact on the airport
as an air navigation services provider. Until all technical and operational aviation safety
matters are addressed to the satisfaction of Glasgow Prestwick Airport, and a mitigation
agreement is put in place for the life of the wind farm, the airport also objects to the proposal. 
Local Development Plan Policy is clear that developments that have an adverse impact on the
Safeguarding of Airports should be refused. 
Having due regard to the above it is concluded that due to the fact that National Air
Traffic Services Safeguarding (NATS) and Glasgow Prestwick Airport have advised the
Energy Consents Unit that they object to the proposal, it will have an adverse impact
on aviation and is therefore inconsistent with the provisions of SG 2 Renewable Energy,
Policy LDP 6 – Supporting the Sustainable Growth of Renewables and SG LDP TRAN 7
–Safeguarding of Airports of the Argyll & Bute Local Development Plan, the Onshore
Wind Policy Statement and Policy 11 (Energy) of the National Planning Framework 4 in
this respect. 
Argyll & Bute Council therefore object to the proposal due to the adverse impact it
would have on Aviation. The Energy Consents Unit should please note that if National
Air Traffic Services (NATS) and Glasgow Prestwick Airport withdraw their objections,
then Argyll & Bute Council would no longer object on these grounds. Should these
objections not be removed, and the proposal progresses to an Inquiry, Argyll & Bute
Council would defer to National Air Traffic Services and Glasgow Prestwick Airport as
the Technical Experts on this matter 
  
Author of Report: Arlene Knox        Date: 31st January 2023
Reviewing Officer: Sandra Davies       Date: 31st January 2023 
 
  
Fergus Murray   
Head of Development and Economic Growth