Appendix 3 
Perth and Kinross Council
Strategic Housing 
Investment Plan
2023/24 – 2027/28
‘Everyone in Perth and Kinross has access to the right home, in
the right place and at the right cost” 
November 2022

Page 2

1. Introduction
1.1 Good quality homes in well-designed places make a significant
contribution to Perth and Kinross Council’s (PKCs) wider aims of
creating safe and sustainable communities where people aspire to live. 
1.2    The Strategic Housing Investment Plan (SHIP) 2023/24 – 2027/28
outlines investment priorities for affordable housing which will support
delivery of the outcomes that are set out through our Local Housing
Strategy (LHS). 
1.3 Good quality affordable homes can have a positive impact on quality of
life. With demand for housing in Perth and Kinross continuing, and the
housing needs of our communities becoming increasingly complex, our
commitment to providing a range of affordable housing options remains
a key strategic priority. We remain committed to building more homes
and overseeing a long-term programme of new affordable housing
development to meet local needs and to support the Scottish
Government’s Housing to 2040 strategy. 
1.4 The SHIP 2023/24 – 2027/28 proposes to deliver 1435 affordable homes
over the next 5-year period. This confirms our commitment to continue
with the scale, pace of delivery, and exceed the forthcoming LHS 2022 -
2027 target of 210 affordable homes per year.
1.5 The SHIP has been developed in partnership with Community members,
Registered Social Landlords (RSLs), the Health and Social Care
Partnership, the Planning Service, and the Housing Service.
1.6 The SHIP is designed to be a working tool which:
• improves longer-term strategic planning
• provides a practical plan detailing how investment in affordable
housing will be directed
• provides an opportunity for the Council to set out key investment
priorities for affordable housing and demonstrates how these will
be delivered and the resources which will help deliver these
priorities
• forms the basis for more detailed programme planning
• provides a focus for partnership working
• informs, and is informed by, the preparation of Registered Social
Landlord (RSL) development funding plans
• informs the allocation of resources from a national to a local
authority level.

Page 3

1.7  Confirmation of our Resource Planning Assumption (RPA) was
announced during July 2021 by the Scottish Government which covered
the period 2021/22 – 2025/26. For the Financial Years 2026/27 –
2027/28, the 2025/26 RPA has been used in line with Scottish
Government Guidance until further announcements are made. 
Table 1
Financial
Year 
2023/24  2024/25  2025/26  2026/27*  2027/28*  TOTAL 
RPA
(£Millions) 
£16.587  £16.645  £16.921  £16.921  £16.921  £83.995 
*More Homes Division Guidance Note 2020/02 only covers a 3-year
period. 
1.8 The Council will continue to increase the scale and pace of delivery of
affordable housing over the next five years through an estimated RPA of
circa £84m as highlighted in Table 1. 
1.9  All projects identified as priorities for funding and delivery over the 5-
year period are identified in Appendix 1. All projects are recorded
through the Scottish Government’s Housing and Regeneration
Programme (HARP) system.
1.10  Projects included within the SHIP as affordable housing will be delivered
through new build, buybacks, regeneration, renovation, and re-
modelling. The Scottish Government will use this information to draft a
Strategic Local Programme (SLP) Agreement. Once agreed, the SLP will
form the basis of the Council’s and our partner RSL Programme
Agreements.
1.11 It should be noted that this SHIP is subject to developments coming
forward timeously, including obtaining the necessary approvals and
consents where appropriate. The varying levels of restrictions on building
site activity during the pandemic has had a significant effect on
housebuilding over the past two years, and will continue to have an
impact going forward. In Scotland as a whole, there were 33% fewer new
homes completed in 2020-21 compared to 2019/20 which the Scottish
Government has attributed to the COVID-19 restrictions on
housebuilding.

Page 4

1.12 There are significant challenges with the development of affordable
housing projects. These challenges relate to:
• market volatility being experienced in the construction sector 
• increasing energy prices
• significant material prices increase 
• labour and material shortages
• construction boom
• the war in Ukraine
• economic uncertainty
• inflation
• risk allocation
• an element of opportunism
• legislative change in fuel duty. 
1.13 Some of the above factors have resulted in substantial tender prices 
increases and contractor claims, along with contractors unwilling to 
tender or hold prices for any length of time. During 2022/22, there has 
been an increase in construction materials with some  components e.g., 
steel rising 25% in a month. Tender returns have increased in the region 
of 40% over the past year with some projects in excess of that figure. 
1.14 This is particularly significant in relation to contributions from the private
development industry to affordable housing through the Local
Development Plan’s Affordable Housing  Policy where 25% of new
housing developments must include affordable housing. A high
proportion of current and future affordable housing provision is, or will
be, as a consequence of this policy. As such, the pace of this provision
will be dictated by the development industries build-out rate, intrinsically
linked to the performance of the economy and local housing markets. 
1.15 Due to unprecedented conditions within the construction market, there is
extreme volatility both with the pricing and availability of materials &
labour. Combined with capacity pressures, due to delays caused by the
consequences of Covid, this makes public sector tendering for such
projects a relatively unattractive prospect for bidders. In many cases, the
only way to secure appetite for a project is to negotiate a direct award
through a framework as suppliers do not have the resources to
participate in competitive tenders where there are no guarantees of a
successful outcome. 
1.16 It should be noted that some sites which are included in the SHIP are
identified for forward planning purposes only and their inclusion does not
represent a contract or award of funding for projects.

Page 5

2. The Strategic Context
2.1 The planning and delivery of affordable housing is focused on meeting
local needs by supporting the ‘right homes in the right place’. The
Council, as both the statutory housing and planning authority, is
responsible for assessing housing requirements and for ensuring
appropriate land in the right places to enable the delivery of housing. 
2.2  The LHS sets out our strategic vision for housing, considering both
national policy objectives and local priorities, based on housing need and
demand evidence. As well as our strategic response to national
outcomes and national housing priorities, the LHS sets out the approach
to meeting other statutory housing responsibilities, including fuel poverty,
house condition and homelessness. It also provides people with a vital
opportunity to have their say and influence the future delivery of housing
and housing related services in their communities. 
2.3 The forthcoming LHS 2022 – 2027, due to be presented for Committee
approval in early 2023, sets out how PKC and its partner RSLs will
continue to deliver our vision that ‘Everyone in Perth and Kinross has
access to the right home, in the right place and at the right cost.” 
2.4 The LHS has been informed by the themes and aims set out in Housing 
to 2040 for Perth and Kinross to have a well-functioning housing system 
– where people can find and afford a home in the place they want to live,  
including in rural communities. This is supported by the principles of 
supplying high quality homes that are affordable to live in, within 
sustainable communities where people want to live, supported by a good  
mix of housing options. It means that places are well designed and 
connected, supporting people’s wellbeing, and that homes are    
connect to services, facilities, and transport links. This is guided by the
 principle that housing is provided in the right places to create and 
sustain  thriving local in prioritises  connectivity. 
2.5 If approved, the new LHS will incorporate the following to meet the aims
set out in Housing to 2040: 
1. providing more homes at the heart of great places 
2. providing a range of housing options that people can easily       
access, afford and keep 
3. delivering housing for people with varying needs 
4. delivering quality homes with affordable warmth, zero 
emission                and SMART technology.
2.6  This will be achieved through a set of outcomes which reflect local
priorities, national policy objectives and provide a clear strategic direction
for the SHIP 2023/24 – 2027/28.

Page 6

2.7 Housing to 2040 is Scotland’s first ever long-term national housing
strategy providing a vision for what housing should look like and how it
will be provided. The strategy has four key themes: 
• More homes at the heart of great places
• Affordability and choice
• Affordable warmth and zero emissions
• Improving the quality of all homes 
2.8 PKC through the Housing to 2040 commitment will increase housing
supply by assisting to deliver the Scottish Government’s ambition to
deliver 110,000 affordable homes over the next ten years up to 2031/32
where at least 70% of these homes will be for social rent. 
2.9 The Housing to 2040 strategy sets out a specific vision for ensuring: 
• A well-functioning housing system 
• High Quality, Sustainable Homes 
• Sustainable Communities 
• Homes that Meet People’s Needs 
2.10 We have reviewed our strategic priorities considering the ongoing impact
of COVID and new/emerging challenges, particularly the cost-of-living
crisis and its impact on our communities and the growing climate
emergency.
2.11 Through the draft Perth and Kinross Corporate Plan 2022 – 2027, we
have set a vision where everyone can live life well, free from poverty and
inequality. The Corporate Plan will guide PKC to help make decisions
about where to prioritise activity and resources in the future. This is as
the Council transforms as an organization, to deliver on our
commitments, to listen to communities and work in partnership to tackle
poverty, reduce inequalities, improve wellbeing, and support sustainable
communities.
2.12 The Perth and Kinross Offer sets out how we, together with local
communities, will deliver on our ambition to recognise that everyone in
Perth and Kinross has something to offer. Our ambition is to make sure
that we acknowledge this across the area, drawing on the strengths and
assets of individuals and communities, working together so everyone in
Perth and Kinross can live life well.

Page 7

2.13  The PKC Offer will be delivered through the SHIP by ensuring that:
• people will be at the heart of everything that we do
• people will be happier, healthier, and more resilient - with
communities empowered to make decisions
• Perth and Kinross will be a better, greener, and fairer place for
people to live, learn, work, play and visit
• resources will be directed to where communities need them most
• people's needs will be met in a better way, and we will make working
with us easier
• we will improve our digital services to make contacting and accessing
services simpler
• staff are empowered to do what needs to be done to improve
people's lives - being solution-focused and thinking "yes".
2.14 The Community Planning Partnership has revised its ambition for our
area to be the best place in Scotland for everyone to live life well, free
from poverty and inequality. We will do this through:
• Reducing Poverty 
• Physical and Mental Wellbeing 
• Digital Participation 
• Skills, Learning and Development 
• Employability 
2.15 The Scottish Government are currently preparing a new spatial plan for
Scotland that will look ahead to 2050. The fourth National Planning
Framework (NPF4) will set out a vision for what Scotland, as a place,
could and should look like in 2050. This will include national planning
policies and provide a plan for future development in Scotland. Driven by
the overarching goal of addressing climate change, this long-term
strategy is expected to focus on achieving four key outcomes which the
Council will incorporate into its future delivery of affordable housing
through the SHIP 2023/24 – 2027/28: 
• Net Zero Emissions
• A Wellbeing Economy
• Resilient Communities
• Better Greener Places

Page 8

2.16 In addition to the ‘Housing to 2040 Strategy’, the SHIP takes cognisance
of the Scottish Government’s Housing and Planning Delivery Framework
(HPDF) which promotes more efficient collaboration between Housing
and Planning Services in relation to the Local Housing Strategy, Housing
Need and Demand Assessment and Scottish Planning Policy. Perth and
Kinross Council's Strategic Housing Investment Plan, the Local Housing
Strategy, and the Local Development Plan all aim to support the
implementation of the Housing and Planning Delivery Framework which
aims to: 
1. increase the supply of housing 
2. make the housing system more responsive to demand
3. improve long term housing affordability 
4. reduce volatility in the housing market
2.17  A range of key strategic and planning documents including the Strategic
Development Plan (SDP), the Local Development Plan (LDP), the
Housing Land Audit and the Perth and Kinross Health and Social Care
Partnership Strategic Investment Plan and the Rapid Rehousing
Transition Plan have also informed the SHIP.
2.18 The Council’s Child Poverty Action Report plays a pivotal role in
investment priorities for affordable housing to put poverty at the heart of
housing to reduce the cost of living and invest in areas where child
poverty is highest within Perth and Kinross. We do this by:
• increasing the supply of affordable homes within Perth and Kinross
by achieving as a minimum the Building Technical Silver Standard
(Aspects 1 & 2) to address fuel poverty
• continuing to build on the success of the ‘Home First’ initiative to
reduce the potential impact of homelessness on families 
2.19 The SHIP also recognises the fundamental role housing has in tackling
poverty. This SHIP aims to support the delivery of a range of property
types and sizes that meet the needs of households of all sizes through
the creation of high-quality energy efficient homes in sustainable
communities that support health, wellbeing, and educational attainment.
2.20 As such, our investment priorities are reflected by significant regeneration
investment in areas where levels of poverty are highest.
2.21 The Council has allocated resources to identify opportunities for new 
affordable housing in all rural areas across Perth and Kinross, current 
activity is focused throughout Highland Perthshire where a lack of 
affordable housing is particularly acute.

Page 9

2.22 The Rural Housing Fund (RHF) is available specifically for Affordable 
Housing projects in rural areas. In the current period to 2026, £25 million 
is available to fund rural projects, which is open to community-led 
projects, landowners and private/charitable sector organisations. This 
fund is not open to Councils. However, to progress this opportunity the 
Council is working closely with the rural specialist agency Community 
Housing Trust (CHT) who have a proven track record of working with 
rural communities to deliver community-driven affordable housing 
projects. To support this, the Council have also increased resources in 
this area and are focused on maximising RHF investment in rural 
communities in the current period to 2026.  
3. Housing Need and Demand
3.1 The Perth and Kinross Housing need and Demand Assessment (HNDA)
was conducted across the Tayplan area which includes Angus, Dundee,
Perth and Kinross and Northern Fife during 2021.
3.2 For development planning purposes, the Perth and Kinross housing
market is considered in terms of five Housing Market Areas (HMAs)
(Appendix 2 provides a list of the HMAs) and the need for additional
housing is reported at this level. The report on our most recent HNDA is
due to be complete by the end of October 2022. The information from
this will be used to inform Housing Supply Targets to be adopted in our
revised LHS.
3.3  The LHS sets an annual Housing Supply Target which determines the
type of market and affordable housing required to meet housing need
and demand throughout the LHS period. This includes the level of
affordable housing required to meet housing needs and a target for the
delivery of affordable homes for households with particular needs.
3.4 In order to increase housing supply and contribute towards the Housing
Supply Target, the Council, and its partners, will aim to deliver a minimum
of 210 affordable homes per year. During the period 2016/17 – 2020/21
PKC delivered 963 affordable homes, delivering on average 193 affordable
homes per year. During the 2021/22 Financial Year, the Council and its
partners delivered 308 affordable homes.
3.5  Our Vacant Property Development and Private Sector Housing Teams
provide advice and assistance to owners of long-term empty properties.
Having empty homes as an integral part of affordable housing provision
ensures a coordinated approach within Perth and Kinross. Through
Vacant Property Feasibility Grants, funding of professional fees for owners
enables them to undertake feasibility studies to enable repairing or re-
purposing of their empty properties. Initiative grants also enable owners to
upgrade or repair their properties in return for the properties being let
through the Rent Bond Guarantee Scheme for a period of 5 years, not
exceeding current Local Housing Allowance rent levels. The Council’s aim
is to bring back 130 privately owned empty properties back into use as
housing each year.

Page 10

3.6  The housing needs and accommodation activity of Gypsy/Traveller
communities continues to be closely monitored by the Council. Although
there are no plans in the current SHIP for affordable homes for
Gypsy/Travellers, work is progressing to establish the unmet needs of
transient Gypsy/Travellers. Consultation is also continuing with the local
Gypsy/Traveller community through the findings of the Local House
Condition Survey and following the transfer of two sites to the Housing
Revenue Account (HRA). The information obtained will be used to plan
future investment and maintenance of existing sites. Recognising that
needs may change, the Council will continue to monitor the position and
be ready to embrace this through new LHS guidance.
3.7  The Council will support applications to develop land into permanent or
transit sites for Gypsy/Travelers. The land does not need to be identified
in the Local Development Plan and no evidence of need is required.
Consultation is currently ongoing regarding Gypsy / Traveler site
standards.
4. Wheelchair & Particular Needs Housing
4.1  We are committed to increasing the supply of wheelchair accessible
homes in accordance with requirements set out in the Scottish
Government Guidance Note MHDGN 2019/02.
4.2  Work is currently underway with our RSL partners to deliver wheelchair
accessible homes across urban and rural Perth and Kinross. Through
our Strategic Local Plans, the aim is to ensure that where possible, 10%
of all homes built are suitable for people with particular needs, such as
wheelchair users, where this can be met within affordable housing
development sites.
4.3  Improvements in information on the requirement for wheelchair
accessible homes alongside demographic information has developed a
clearer picture of the future requirement for wheelchair accessible
housing. This is incorporated into the 2022-27 LHS to support
developers to include specialist housing provision in private sector
developments.
5. Rapid Rehousing Transition Plan (RRTP) Priorities 
5.1  Addressing the key Homelessness and Rough Sleeping Action Group
(HARSAG) recommendation, the Council aligns strategic housing
priorities consistent with the RRTP and ensures that the new supply of
affordable housing is fully integrated within the Council’s ‘Home First’
model.
5.2 The Council’s ‘Home First’ model was introduced in 2017 and its aim is to  
assist homeless households move straight into settled accommodation
and avoiding the use of temporary accommodation. Minimising the 
duration, impact, stigma, and cost of homelessness is the key objective 
as well as ensuring the best outcome for homeless households.

Page 11

5.3   Increasing the supply of affordable housing will assist in meeting the
RRTP strategic aims of prevention of homelessness. In addition, it will
also support the commitment to ensuring that those in housing need to
find the fastest route to safe and secure accommodation to help them
resettle in their new homes quickly and successfully with support.
5.4  With a strong focus on the prevention of homelessness, the Council
identifies and supports those at highest risk of homelessness. This is
whilst also assisting those who find themselves homeless to be rehoused
as quickly as possible, promoting choice, and ensuring positive outcomes
to reduce the stress and trauma that homelessness brings to individuals
and families.
6. Partnership Working, Consultation and Collaboration
6.1 The SHIP has been developed and implemented through close
partnership working with the Scottish Government, RSLs, Perth and
Kinross Health and Social Care Partnership, Housing, Planning Division
and Community members. A number of mechanisms are in place to
ensure that a range of partners participate in the ongoing delivery of the
SHIP.
6.2 There is a strong history of partnership working in Perth and Kinross with
RSLs and internal and external partners to deliver the ambitious housing
programme. There are five RSLs with active projects within the SHIP.
They also have a keen interest in continuing the partnership working to
develop affordable housing within Perth and Kinross.
6.3 A number of other RSLs have expressed an interest in delivering
affordable housing within Perth and Kinross within the period of the
SHIP.
6.4 The Council will continue to explore options for joint working around
innovative delivery mechanisms that support the provision of affordable
housing throughout Perth and Kinross. Both the Council and RSL
Partners will continue to look for efficiencies in construction methods and
will work with the construction industry and design teams to determine
the suitability of non-traditional construction methods for projects
included with the SHIP.
6.5 Monthly updates with the RSL partners continue to take place. The RSL
partners continue to engage with the PKC Affordable Housing Enablers
about potential future development opportunities. The monthly meetings
bring an opportunity for partners to discuss the wider programme and
strategic issues including updates from the Scottish Government,
Scottish Water, the SHIP, and site prioritisation. Every two months,
updates are provided to the Scottish Government to discuss the
programme and key requirements throughout the programme year
(focus is specific project issues relating to planning, public utilities and
slippage impacting current/future year funding).

Page 12

6.6 This structure provides the Council with a proactive approach to
monitoring project progress which complements discussions on strategic
issues affecting the delivery of affordable housing in Perth and Kinross.
6.7 In developing the SHIP 2023/24 – 2027/28, all RSLs provided project
proposals. All proposals were assessed alongside Council projects by the
New Build Project Board (NBPB) see Appendix 3. The NBPB were
provided with projects that were assessed against the SHIP prioritisation
Framework (See Appendix 4) and approved which projects to include
within the SHIP.
6.8 The Perth and Kinross multi-agency Independent Living Panel provides
key information to the SHIP. They meet monthly and are made up of
Housing and Health and Social Care Partnership representatives,
including RSL and Care Providers. The Panel provides an integrated
approach to meeting housing, health and social care needs of people
who have been assessed with the eligibility criteria as requiring support to
enable them to live as independently as possible in their own home or
within specialist provision.
6.9 The Panel reviews and analyses and authorises the allocation of
appropriate housing provision for individuals as requiring specialist
housing, care, and support to live independently in Perth and Kinross.
6.10 The Independent Living Panel:
• makes recommendations for the allocation of accommodation for the
provision for independent living need
• ensures that an overview of demand and supply for independent
living needs in Perth & Kinross is maintained and regularly reviewed
• provides a link between NHS, PKC, HSCP and third sector partners
to ensure a joined-up approach and co-design of housing solutions
for those with specialist housing, care, and support needs
• links with the New Build Programme to ensure gaps in service
provision are met effectively and to inform the future planning and
development of services
• seeks reviews on placements in specialist accommodation to ensure
the provision is being used appropriately for those in most need
• conducts quality assurance checks on cases referred to the Panel to
ensure consistency across and within the allocation process and the
provision of specialist accommodation
• ensures the efficient and effective use of resources
6.11  The Council has frequent meetings with developers to discuss
development sites and how housing developments can contribute to LHS
priorities through inclusion of their proposed developments in the SHIP.
The Council have procured housing through the Scottish Procurement
Framework as well as through Section 75 agreements being made with
Developers in fulfilling the requirements of the Affordable Housing Policy.

Page 13

6.12  In taking forward the LHS and the SHIP, workshop events are organised
to consult on the objectives of both and thoughts on how objectives can
best be met are invited from a wide audience of partners and community
representatives.
6.13  The SHIP document is widely circulated, and comments are invited
ahead of finalisation.
7.  Review Mechanism – Response & Resolution of Constraints
7.1  The Council regularly reviews affordable housing projects, both internally
and with RSL Partners, to ascertain progress through monthly meetings.
Tripartite meetings with officers from the Council, RSLs and the Scottish
Government will take place every 2 months.
7.2  Frequent, formal review process assists with the identification of
constraints and potential slippage in the programme at an early stage.
Early contact and liaison with internal stakeholders, such as Planning, or
external stakeholders, such as Scottish Water, has assisted the Council
in resolving constraints and achieving effective programme management
outcomes. 
8. Affordable Housing Supply Programme (AHSP) 
8.1  The Affordable Housing Supply Programme forms part of the Scottish
Government’s More Homes Scotland approach, which aims to increase
and accelerate the supply of homes across all tenures. The Programme
supports the Council in delivering our affordable housing priorities, by
providing quality homes in mixed communities that fit local need.
8.2  The grant subsidy which is available through the Affordable Housing
Supply Programme supports the delivery of social rented housing,
homes for mid-market rent, and the provision of housing for low-cost
home ownership (most notably the new supply shared equity scheme).
8.3 Resource Planning Assumptions (RPA) support the delivery of new
affordable homes across Perth and Kinross by providing grant support at
flexible benchmark rates for each affordable home developed.
8.4  The Council RPA for the 2023/24 Financial Year is £16.587m. Future
years 2024/25 – 2025/26 RPA funding was agreed during July 2021 as
highlighted within Table 1, (paragraph 1.8). Through Scottish
Government Guidance MHDGN 2022/02, it advises to use the 2025/26
RPA as the basis for future years until announced. As such, it is prudent
to take a conservative approach for future years within the SHIP until
further information on RPA levels post 2026 is known, to avoid abortive
work or other cost risks.
8.5  The Affordable Housing Enablers continue to identify additional projects
and liaise with RSL partners to bring further opportunities for affordable
housing into the programme.

Page 14

8.6  The SHIP projects that 1435 affordable homes could be delivered in the
period to 2027/28.
8.7  The Funding from the Scottish Government, required to deliver the
proposed affordable Housing projects as outlined within the SHIP
2023/24 – 2027/28, as per Table 1. 
8.8 Over and above the increased flexible grant benchmark rates, additional
grant funding is available from existing Resource Planning Assumptions
to affordable housing developers who meet Scottish Government criteria
in relation to specific quality and design features. This includes: 
• the delivery of homes to Silver Level of the 2019 Building Regulations
in respect of Energy for Space Heating
• the provision of balconies within flatted developments where the
provision of private or communal outdoor space is not possible
• the provision of space for home working or study where it is not
possible to incorporate such space within the design of the homes
under current space standards
• by ensuring that all new social rented homes are digitally enabled
with tenants able to arrange for an internet connection without the
internet service provider having to provide additional cabling to the
premises
• the installation of ducting infrastructure for electric vehicle charge
point connectors
• the installation of automatic fire suppression systems; and
• installation of heating systems which produce zero direct emissions
at the point of use 
8.9 The increased flexible benchmark rates of grant and additional grant
being made available to affordable housing developers who incorporate
enhanced design elements is being met from current known RPA. This
may have an impact on the number of new affordable homes being
delivered as the level of grant for each property increases.
8.10  The Council, alongside its RSL partners, has sought to be as realistic as
possible in detailing the programme. Projects that have been assessed
as having completions by March 2023 have been programmed within the
first year of this SHIP. Years 2 and 3 of the SHIP see the conclusion of
large projects with a fewer number of projects detailed in later years. It
should be noted that the SHIP is reviewed every year.
8.11 The Council, in consultation with the Scottish Government, will continue
to manage the AHSP in conjunction with its Housing Capital Plan,
Housing Revenue Account investment, Council Tax 2nd Homes Funds,
Commuted Sums to support and maximise delivery of affordable housing
in priority areas during the SHIP period.

Page 15

9. Funding Resources, Housing Revenue Account, Developer
Contributions and Council Tax (Second Homes)
Funding Resources to support delivery of SHIP priorities are
summarised: 
• Housing Revenue Account (HRA) 
9.1 Prudential borrowing via the HRA is the key funding component used in
addition to Scottish Government Housing Subsidy to support the delivery
of new affordable homes for PKC affordable housing. The financial
viability of all potential Council new build projects is assessed in terms of
the Housing Revenue Account 30-year business plan, to ensure that the
capital costs generate a reasonable return on investment over the long
term. The new build programme is monitored as part of the HRA capital
monitoring process between finance, housing, and property.
• Developer Contributions
9.2 Applications that meet the criteria can be made to PKC to support the
delivery of affordable homes from Developer Contributions (DCs).
Information on applications received during 2021/22 in respect of
supporting the delivery of affordable homes are detailed below:
DEVELOPER PROJECT AFFORDABLE
HOMES
HMA  DCs Used £ 
KHA Earlsgate,
Scone
51 Perth HMA  £765,000.00
KHA Bertha Park
(Phase 2A),
Perth
28 Perth £196,000.00
KHA Rattray 6 Strathmore £78,000.00 
PKC Milne Street,
Perth
8 Perth £188,000.00
Rannoch CDT Feasibility N/A Highland £5,300.00

Page 16

9.3      As of 1 September 2022, there was £1,700,000.00 available within
Developer Contributions to assist in bringing forward affordable housing
developments throughout Perth and Kinross. Policy requires these funds
to be invested in the same HMA they were collected. 
• Council Tax Reserve Income from the Reduction of
Discount for Empty and Second Homes
9.4 The Council has funding available through income raised each financial
year from Council Tax (Empty Homes and 2nd Homes). This funding
assists in supporting the delivery of all affordable homes delivered by
the Council (new build and Empty Homes) and new builds for RSLs.
9.5 These funds are used to support the Vacant Property Development and
Private Sector Teams bring empty homes back into use for housing.
The following empty properties have been brought back into use as
housing through assistance of these funds:
Financial Year Empty Homes Brought Back into Use
2015/16 149
2016/17 138
2017/18 146
2018/19 145
2019/20 139
2020/21 93
2021/22 130
TOTAL 940 
9.6  As of 1 April 2022, the balance of funds remaining from Council Tax for
the delivery of affordable housing was £4,281,000.00. Since 2015/16
through the delivery of New Build affordable housing and Empty homes,
the Council has used funding of over £11m from this to assist with the
delivery of affordable homes.
10. Affordable Housing Policy
10.1   The Developer Contributions and Affordable Housing Supplementary
Guidance (2020) sets out the contribution that developers must make
towards the delivery of affordable housing as a condition of securing
planning approval for a new build development. The Supplementary
Guidance requires new housing developments within Perth and Kinross
to provide a 25% Affordable Housing Contribution.
10.2  Affordable Housing can include a variety of forms, such as social rent,
Low-Cost Home Ownership options such as Shared Equity, Mid-market
/ intermediate rent, and self-build plots. Sites delivered though the
Supplementary Guidance make a significant contribution to the SHIP.

Page 17

10.3  Commuted Sums make a great contribution towards the delivery of
affordable housing in Perth and Kinross. The Council continues to utilise
contributions resulting from the Supplementary Guidance to support the
delivery of affordable homes within its own programme and with RSL
partners where appropriate.
11. SHIP Prioritisation Framework
11.1  All affordable housing proposals that are to be included within the SHIP
are prioritised by the SHIP Prioritisation Framework (PF) (APPENDIX
4). This framework prioritises investment whilst assessing the proposals
against the Council’s strategic aims and priorities, along with
deliverability, and the community benefits it will provide
11.2  In assessing projects for inclusion in the SHIP, the Council considers
the following:
• Whether the development assists with the delivery of LHS                   
outcomes
• The extent to which the development addresses housing needs
• Site attributes
• Whether planning approval is in place
• Funding requirements
• Strategic priority
• Deliverability
11.3  The PF is not intended to provide the only assessment of priority;
however, the Council will continue to balance its investment decisions
through a mixture of Council, RSL and developer delivery and by
considering a range of affordable housing tenures to meet housing need
across all the HMAs.
11.4  In recognising the need for housing to address particular support needs,
including wheelchair accessible homes, projects which provide this type
of housing will attract extra points under the scoring criteria.
12. Energy Efficiency
12.1  The Council seeks to maximise the opportunities for energy efficiency
and reduction of fuel poverty through achieving the ‘Greener’ energy
efficiency standard in new builds where practical. To meet this standard,
homes must meet Section 7 (Aspect 1 & 2) of the 2011 Building
Regulations in relation to Carbon Dioxide emissions and energy for
space heating.
12.2  The standard may not be attainable in all projects, particularly where an
existing building is to be redeveloped or where homes form part of a
larger development for market provision or through the PKC Buyback
scheme.

Page 18

12.3  The Council supports RSL partners to develop to Silver Standards as a
minimum and to provide enhanced levels as set out within the Scottish
governments Housing to 2040 vision.
12.4  The Council are currently in the process of developing its new net zero
Design Guide. It is anticipated by 2023/24 that all PKC new build
affordable homes will meet the ‘Gold Standard’ as a minimum and meet
some of the key objectives within the Council’s climate change strategy
and action plan.
13. Equalities
13.1  The Council are fully committed to equalities and diversity. The General
Equality Duty has three main aspects:
• Eliminate Discrimination
• Advance equality of opportunity
• Foster good relations between communities. 
13.2  The Council will respond to the different needs and service
requirements of people regardless of sex, race, colour, disability, age,
nationality, marital status, ethnic origin, religion or belief, sexual
orientation, or gender re-assignment. The planning and delivery of good
quality housing and appropriate information, advice and support
services embrace the principle of equal opportunities and equality in
outcomes. 
13.3  The SHIP plays a vital role in promoting this agenda. People with
specialist needs should have the opportunity to live independently in
their own homes and community. To address specialist needs, at least
10% of new affordable homes will be delivered to meet particular
support needs (this also includes wheelchair accessible).
14. Strategic Environmental Assessment
14.1  The Strategic Environmental Assessment (Scotland) Act 2005 requires
that all qualifying plans, programmes, and strategies, including policies
are screened to assess the potential environmental impact of the plan.
A Strategic Environmental Assessment (SEA) ensures that
environmental issues are considered by decision makers alongside
social and economic issues.
14.2  The SHIP, as part of the LHS, was considered under the Environmental
Assessment (Scotland) Act 2005 and pre-screening identified that the
SHIP would have no, or minimal, environmental effects. It is therefore
exempt, and the SEA Gateway has been notified.

Page 19

15.  Monitoring
15.1  The SHIP is closely monitored, and funding is claimed promptly to
promote and maximise the funding invested within Perth and Kinross.
Annual reviews of progress in increasing the supply of housing are
reported to the Council’s Housing and Social Wellbeing Committee, as
part of the review of progress in implementing the LHS. 
15.2 A range of project management activities are used to ensure resources
are managed effectively with projects progressing as planned. These 
include: 
• ongoing liaison between services within the Council and between the
Council and Registered Social Landlord partners on specific projects
• multi-agency project group meetings 
• quarterly tripartite meetings involving the Council, individual
developing Registered Social Landlord partners and the Scottish
Government
• six weekly internal Board meetings to review progress. Throughout
the duration of this SHIP progress will continue to be monitored to
support project delivery

Page 20

APPENDIX 1 - Strategic Housing Investment Plan (2023/24 – 2027/28)
Affordable Housing Site Starts (2023/24 – 2027/28)
Developer  23/24  24/25  25/26  26/27  27/28  Total AH 
PKC  110  91  180  50  52  483 
KHA  93  115  74  60  0  342 
HH  77  35  60  0  140  312 
CHA  0  85  0  21  0  106 
PfP  218  0  0  37  0  255 
Ark  26  0  0  0  0  26 
Total Site Starts  524  326  314  168  192  1524 
Affordable Housing Completions (2023/24 – 2027/28)
Developer 23/24 24/25 25/26 26/27 27/28 Total AH
PKC 54  70  153  88  120  485 
KHA 21  59  154  72  68  374 
HH 17  45  67  0  60  189 
CHA 0  0  30  55  21  106 
PfP 0  75  143  0  37  255 
Ark 0  18  8  0  0  26 
Total Completions 92  267  555  215  306  1435 
PKC –  Perth & Kinross Council, KHA –  Kingdom Housing Association, HH – Hillcrest Homes, CHA – Caledonia Housing Association,  
PfP –  Places for People, ARK – Ark Housing Association

Page 21

Pre 2023/24 Site starts with Completions in 2023/24+ 
Project Address  HMA  HARP   Developer  Total
Units 
Site Start Pre
23/24  Completions 23/24  Completions 24/25  Completions 25/26 
Lynedoch Road,
Methven  Perth  P44746  PKC  24  24  24  0  0 
Broich Road, Crieff
(Ph2)  Strathearn  P42217  KHA  14  14  14  0  0 
Bertha Park, Perth
(Ph2B)  Perth  P44623  KHA  7  7  7  0  0 
Bertha Park, Perth
(Ph3)  Perth  P42218  KHA  41  41  0  41  0 
Old Causeway, Kinross  Kinross  P44839  HH  8  8  8  0  0 
Abbeyfield, Crieff  Strathearn  P44843  HH  9  9  9  0  0 
Westpark, Blairgowrie
(Ph1)  Strathmore  P44842  PfP  73  73  0  30  43 
176  176  62  71  43

Page 22

2023/24 Site Starts with Completions 23/24+ 
Project Address  HMA HARP Developer  Total
Units 
Site Start
23/24  Completions 23/24  Completions 24/25  Completions 25/26 
Buybacks  Various  (INPUT)  PKC  30  30  30  0  0 
Rossie Place,
Auchterarder (Ph1 &
2) 
Strathearn  P42212  PKC  40  40  0  20  20 
Coupar Angus, Grewar
Farm  Strathmore  TBC  PKC  40  40  0  20  20 
Broich Road, Crieff
(Ph3)  Strathearn  P44834  KHA  18  18  0  18  0 
Milnathort, Kinross  Kinross  P43762  KHA  16  16  0  0  16 
Lathro Farm, Kinross  Kinross  P45490  KHA  35  35  0  0  35 
Meigle  Strathmore  TBC  KHA  24  24  0  0  24 
Aberfeldy (TBC)  Highland  TBC  HH  25  25  0  25  0 
Oudenarde  Perth  TBC  HH  40  40  0  20  20 
Moncur Farm,
Inchture  Perth  TBC  HH  12  12  0  0  12 
Scone North  Perth  TBC  PfP  60  60  0  15  45 
Almond Valley  Perth  TBC  PfP  0  85  0  30  55 
Westpark, Blairgowrie
(Ph1)  Strathmore  TBC  PfP  73  73  0  30  43

Page 23

Former Crieff PS, Crieff  Strathearn  TBC  Ark HA  0  8  0  0  8 
Hawarden Tce, Perth  Perth  P42222  Ark HA  18  18  0  18  0 
431  524  30  196  298

Page 24

2024/25 Site Starts with Completions 2024/25+ 
Project Address  HMA HARP Developer  Total
Units  Site Start 24/25  Completions
24/25 
Completions
25/26  Completions 26/27 
Buybacks  Various  TBC  PKC  30  30  30  0  0 
Rossie Place,
Auchterder (Ph3)  Strathearn  P42226  PKC  20  20  0  20  0 
Balhousie PS, Perth  Perth  P42225  PKC  25  25  0  25  0 
St Catherines Square,
Perth  Perth  TBC  PKC  30  30  0  30  0 
Pitlochry  Highland  TBC  PKC  8  8  0  8  0 
Bertha Park, Perth,
(Ph4)  Perth  P44820  KHA  54  54  0  40  14 
Broich Road, Crieff
(Ph4)  Strathearn  P44836  KHA  12  12  0  12  0 
Bridge of Earn  Perth  P45521  KHA  27  27  0  27  0 
Alyth  Strathmore  P44828  CHA/PKC  43  43  0  20  23 
Luncarty  Perth  P42216  CHA/PKC  20  20  0  10  10 
Milnab St, Crieff  Strathearn  TBC  HH  10  10  0  10  0 
Western Tomanock,
Crieff  Strathearn  TBC  HH  25  25  0  25  0 
Stanley H31  Perth  TBC  CHA  22  22  0  0  22 
326  326  30  227  69

Page 25

2025/26 Site Starts with Completions 2025/26+ 
Project Address  HMA HARP Developer  Total
Units  Site Start 25/26  Completions 25/26  Completions 26/27  Completions 27/28 
Buybacks  Various  TBC  PKC  30  30  30  0  0 
Rossie Place,
Auchterarder (Ph4)  Strathearn  P42231  PKC  20  20  0  20  0 
Borlick (Ph1),
Aberfeldy  Highland 
P42208
P42221
P42227 
PKC  65  65  0  30  35 
Perth West  Perth  P44832  PKC  65  65  0  30  35 
Bertha Park, Perth
(Ph5)  Perth  P42228  KHA  58  58  0  20  38 
Stanley H30  Perth  P42215  KHA  16  16  0  16  0 
Thimblerow  Perth  TBC  HH/PKC  60  60  0  0  60 
314  314  30  116  168

Page 26

2026/27 Site Starts with Completions 2026/27+ 
Project Address  HMA  HARP Developer  Total
Units  Site Start 26/27  Completions 26/27  Completions 27/28  Completions 28/29 
Buybacks  Various  TBC  PKC  30  30  30  0  0 
Beechgrove,
Perth  Perth  TBC  PKC  20  20  0  20  0 
Bertha Park,
Perth (Ph6)  Perth  P43764  KHA  60  60  0  30  30 
Pitlochry  Highland  P44832  CHA  21  21  0  21  0 
Westpark,
Blairgowrie
(Ph2) 
Strathmore  TBC  PfP  37  37  0  37  0 
168  168  30  108  30

Page 27

2027/28 Site Starts with Completions 2027/28+ 
Project Address  HMA HARP  Developer  Total
Units  Site Start 27/28  Completions 27/28  Completions 28/29  Completions 29/30 
Buybacks  Various  TBC  PKC  30  20  30  0  0 
Stanley H30
(Ph2)  Perth  P42214  PKC  22  22  0  22  0 
Oudenarde  Perth  TBC  HH  140  140  0  40  100 
192  182  30  62  100

Page 28

Appendix 2 – HMAs
Perth and Kinross Settlements by HMA 
HMA 
Greater Perth Abernethy. Abernyte. Almond bank. Balbeggie. Bankfoot. Bridge of Earn.
Dunning. Errol. Forgandenny. Glencarse. Glenfarg. Guildtown. Inchture,
Invergowrie, Longforgan. Luncarty. Methven, Murthly, Perth. Scone.
Stanley. St Madoes. Wolfhill
Highland  Aberfeldy. Ballinluig, Blair Atholl. Dunkeld. Fearnan. Kenmore.
Kinloch Rannoch. Pitlochry
Kinross  Blairingone. Crook of Devon, Glendevon. Keltybridge.
Kinnesswood, Kinross, Milnathort, Powmill, Scotlandwell
Strathearn  Aberuthven, Auchterarder, Blackford. Braco, Comrie, Crieff.
Gilmerton. Gleneagles, Greenloaning. Muthill, St Fillans
Strathmore and
Glens (formerly
Eastern Perthshire) 
Alyth. Ardler. Blairgowrie. Bridge of Cally. Burrelton. Caputh. Coupar
Angus. Kettins, Kirkmichael, Meigle. Meikleour, New Alyth.
Spittalfield. Woodside

Page 29

Appendix 3   
New Build Project Board Members – 
Name Position within PKC
Elaine Ritchie Senior Service Manager (Housing)  
Ben Wilson Service Manager – Planning and Housing Strategy
Nicola Lennon Service Manager - Housing
Andy Saum Team Leader – Housing Strategy
Steven Coyle Finance and Governance Team Leader
Norman Ballantine Capital Programme Manager

Page 30

Appendix 4 – SHIP Prioritisation 
Methodology Prioritisation Framework Scoring
Introduction
The Prioritisation Framework provides a tool to prioritise investment which balances the Council’s strategic objectives, deliverability,
and community benefits. It is used to assess projects for inclusion in the SHIP, which will assist in deciding whether we bring projects
forward to SHIP inclusion.
The framework does not provide the only assessment of priority and Perth and Kinross Council will continue to balance its investment
decisions through a mixture of Council, Registered Social Landlord and Developer delivery by considering a range of affordable
housing tenures to meet housing needs across its Housing Market Area.
As projects develop there may be a need to adjust to the scoring output as, for example, planning permission is granted, or wider
community benefits are realised. This may cause the priority of a project to be revised during the life of the SHIP.
Scoring Criteria
1. Contribution to general unmet Housing Need: 
What level of demand can we evidence for a project? How much need is there in the area for affordable housing? What are  
the waiting lists like? What are we predicting for future trends? The scoring structure for demand:
• High - between 7 and 10
• Medium - between 4 and 6
• Low - between 0 and 3
2. Inclusion, Equality and Meeting Particular Needs 
If a project is planned to make additional provision for particular needs (such as wheelchair accessible housing) and/or             
meets a particular needs demand in an area it should score more highly.
• High - between 7 and 10
• Medium - between 4 and 6
• Low - between 0 and 3

Page 31

3. Wider Community benefit and Regeneration: 
If a project delivers wider community amenities or benefits that make a significant contribution to the regeneration of an area    
it should score more highly. Points should also be awarded if the project secures the future of a historic or listed building or 
reuses a brownfield site.
• High - between 7 and 10
• Medium - between 4 and 6
• Low - between 0 and 3
4. Meets agreed strategic priority (Contribution to SOA and LHS Objectives) 
Project is assessed in terms of the overall contribution it would make to achieve the strategic objectives of the Single Outcome   
Agreement and the Local Housing Strategy. The project is assessed depending upon how many objectives the project was 
assessed as contributing towards. The scoring structure:
• High - between 7 and 10
• Medium - between 4 and 6
• Low - between 0 and 3
5. Project Deliverability             
This assesses whether a project is likely to be deliverable within the SHIP timescale. Factors that are considered are whether     
the site is in the ownership of Perth and Kinross or the RSL, and the progress anticipated to be achievable. The scoring               
structure:
• High - between 7 and 10
• Medium - between 4 and 6
• Low - between 0 and 3 
• 
Weighting of scores
Whilst all these measures are important considerations when deciding whether a project goes on to the SHIP, it is felt that the
importance of criteria one should give it extra weighting relative to the other criteria.
Thus, the scoring will be out of a possible sixty, with each of the five criteria scored out of ten but with the score for criteria one
doubled to reflect its importance.

Page 32

The RAG rating for projects:
Low priority Medium priority High priority
1 – 20 20 - 40 40 + 
Reds should be presented to the project board with a recommendation not to add to the SHIP, Ambers would be considered for
inclusion after reviewing any other pertinent factors, Greens would be strong recommendation for inclusion and progression as a
priority.