Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
24/09/2025 
A hybrid meeting of the Housing and Social Wellbeing Committee will be held in
the Council Chamber on Wednesday, 01 October 2025 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Tom McEwan  (Convener)
Councillor Sheila McCole  (Vice-Convener)
Bailie Chris Ahern
Councillor Peter Barrett
Councillor Bob Brawn
Bailie Rhona Brock
Councillor Angus Forbes
Councillor Ian James
Councillor Iain MacPherson
Councillor Carol Mair
Bailie Claire McLaren
Councillor Frank Smith
Councillor Colin Stewart
Councillor Jack Welch
Bailie Mike Williamson
Page 1 of 144

Page 2

Page 2 of 144

Page 3

Housing and Social Wellbeing Committee 
Wednesday, 01 October 2025 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF HOUSING AND SOCIAL WELLBEING
COMMITTEE OF 11 JUNE 2025 FOR APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 25/243) 
9 - 12 
5 POLICE SCOTLAND THEMATIC UPDATE - PUBLIC
PROTECTION UNIT
Verbal Presentation by DCI Graeme Templar 
6 SCOTTISH FIRE AND RESCUE SERVICE THEMATIC UPDATE -
WILDFIRE STRATEGY UPDATE
Presentation by Station Commander Joe Fitzpatrick 
7 STRATEGIC HOUSING INVESTMENT PLAN 2026/27 - 2030/31
Report by Strategic Lead - Economy, Development and Planning
and Strategic Lead - Housing and Communities (copy herewith
25/244) 
13 - 54 
8 CULTURE STRATEGY 2023-2028 MID-TERM REVIEW
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 25/245) 
55 - 134 
9 ANNUAL ASSURANCE STATEMENT 2024/25 - SCOTTISH
HOUSING  REGULATOR
Report by Strategic Lead - Housing and Communities (copy
herewith 25/246) 
135 - 144 
Page 3 of 144

Page 4

Page 4 of 144

Page 5

HOUSING AND SOCIAL WELLBEING COMMITTEE 
Minute of hybrid meeting of the Housing and Social Wellbeing Committee held in the
Council Chambers, 2 High Street, Perth, on 11 June 2025 at 1.30pm. 
Present: Bailies C McLaren and M Williamson, Councillors K Allan (substituting for
Councillor I James) (up to Item 7) , P Barrett, B Brawn, J Duff (substituting for Bailie
C Ahern), D Cuthbert (substituting for Ballie R Brock), A Forbes, I James (Item 10
only), I MacPherson, C Mair, S McCole, T McEwan, F Smith, C Stewart and J Welch. 
In Attendance: C Mailer, Depute Chief Executive, E Ritchie, Strategic Lead –
Housing and Communities; S Merone, Strategic Lead – Economy, Development and
Planning; N Sworowski, H Maclean (both Economy, Development and Planning), K
Steven, D Stokoe, K Evans, C Gordon and S Kimmet (all Housing and Communities)
S Hendry, J Guild, S Dockerill and M Pasternak (all Legal and Governance). 
Also in Attendance: Chief Superintendent N Russell, Local Area Commander G
Burns and Operations Superintendent A Smith (all Police Scotland) (all up to Item 5)
Area Commander B Todd and Group Commander C Wallace (both Scottish Fire and
Rescue Service) (both up to Item 6), L Palmer and R Hammond-Baker (both
Tenant’s Committee Report Panel) 
Apologies: Bailies C Ahern and R Brock. 
Councillor T McEwan, Convener, Presiding. 
Councillor McEwan led on Items 1-6 and 9-10 with Councillor McCole leading on
Items 7-8. 
1. Welcome and Apologies 
Councillor T McEwan welcomed everyone to the meeting. Apologies were
noted as above. 
2. Declarations of Interest 
There were no Declarations of Interests in terms of the Councillors’ Code of
Conduct 
3. Minute of Previous Meeting 
The minute of the meeting of the Housing and Social Wellbeing Committee of
26 March 2025 was submitted and approved as a correct record. 
4. Perth and Kinross Local Policing Area End of Year Police Report – 1
April 2024 to 31 March 2025 
There was submitted a report by Chief Superintendent, Police Scotland, D
Division (Tayside) (25/154) providing information to the Committee regarding the
performance of Police Scotland to facilitate local scrutiny.
3
Page 5 of 144

Page 6

Chief Superintendent N Russell and Local Area Commander G Burns
provided a brief introduction to the report and answered Members’ questions
thereon. 
Resolved: 
The content of report 25/154, be noted. 
5. Scottish Fire and Rescue Service End of Year Performance Report – 1
April 2024 to 31 March 2025 
There was submitted a report by Local Senior Officer, Scottish Fire and
Rescue Service (25/155) providing information to the committee regarding the
performance of the Scottish Fire and Rescue Service, against the priorities,
performance indicators and targets detailed within the Local Fire and Rescue Plan
for Perth and Kinross 2020-23, to facilitate local scrutiny. 
Area Commander, B Todd, provided a brief strategic update regarding the
Service Delivery Review Programme which aims to ensure operational resources are
matched to risk and demand across Scotland.  B Todd advised the next stage of the
process is to open a formal public consultation in the coming months and part of this
consultation will be a proposal to replace the third appliance at Perth Fire Station (a
Combined Ariel Rescue Pump) which was temporarily withdrawn in September
2023.  B Todd confirmed more information is available on the SFRS website and a
full written briefing would be provided in due course. 
Resolved:
The content of report 25/155, be noted. 
There followed a short recess, and the Committee reconvened at 15:10. 
6. Annual Update on Perth and Kinross Local Housing Strategy 2022-27 
There was submitted a report by Strategic Lead – Housing and Communities
and Strategic Lead – Economy, Development and Planning (25/156) noting progress
in implementing the Local Housing Strategy for Perth and Kinross previously
approved at Housing and Social Wellbeing Committee on 15 March 2023 and
seeking approval of the priorities for the current year. 
L Palmer of the Tenant’s Committee Report Panel advised she was happy
with the progress, especially in relation to downsizing and keyworker issues. Going
forward, increased tenant participation in relation to land identification for affordable
housing, would be welcomed. 
Resolved:
(i) The progress made during 2024-2025 towards achieving the outcomes set out
within the LHS Action Plan (Appendix 1), be noted.
(ii) The priorities for 2025-2026 set out in Section 6 below, be approved.
Page 6 of 144

Page 7

7. Tayside Joint Health Protection Plan 2025-2027 
There was submitted a report by Strategic Lead – Housing and Communities
(25/157) (1) seeking agreement on the adoption and implementation of Tayside’s
Joint Health Protection Plan 2025-2027 (TJHPP) as set out in Appendix 1 (2)
providing an overview of the public protection measures across NHS Tayside and
the partner Local Authorities for the period of the plan, in relation to, health protection
priorities, provision, and preparedness; the joint working arrangements in place for
the protection of public health across Tayside; ongoing mechanisms to improve the
level of “preparedness” in relation to responding effectively to health protection
incidents and emergencies; developing learning across the agencies; ensuring
methods for reviewing and recording outcomes and achievements and (3) containing
an action plan as set out in Appendix 2 highlighting PKC’s core activities, including
programmed actions and predicted reactive response mechanisms to ensure the
outcomes of the plan are met. The plan also highlights emerging issues requiring
ongoing consideration in terms of future preparedness. 
Resolved:
(i) The adoption and implementation of the TJHPP 2025-27, be approved.
(ii) The Convener be authorised to sign the approved plan for PKC.
(iii) The attached action plan objectives be supported to ensure the outcomes of
the plan can be met by PKC.
(iv) The ongoing requirements to ensure preparedness in terms of emerging
issues, be acknowledged.  
8. Community Empowerment Annual Report 
There was submitted a report by Strategic Lead – Housing and Communities
(25/158) seeking approval of the Community Empowerment Annual Report for
2024/25. The Annual Report provides an overview of the work done to promote and
respond to interest in Community Asset Transfer and Participation Requests. 
Resolved: 
The Community Empowerment Report 2024/25, be approved. 
9. Locality PB Fund 2024/25 – Funding Awards 
There was submitted a report by Strategic Lead – Housing and Communities 
and Strategic Lead – Strategic Planning, people and Performance (25/159) informs
Committee of the funding commitments made through Participatory Budgeting in the
2024/25 Locality PB Fund across four targeted localities based on deprivation data.
£101,008 was awarded to 28 projects which will help tackle poverty and alleviate the
cost of living. 
Resolved:
Page 7 of 144

Page 8

(i) The funding awarded through participatory budgeting in the Locality PB Fund
for 2024/25 and recommendations for future community grant processes, be
noted.
(ii) It be noted that this report would compliment the report Fairer Communities
for All (25/160) detailing future community grant programmes for 2025/26.
Councillor I James joined the meeting at this point. 
10. Fairer Communities for All 
There was submitted a report by Strategic Lead – Housing and Communities
(25/160) seeking approval on proposed changes to the delivery of the Community
Investment Fund (CIF) and Participatory Budgeting (PB) funding 2025/26.
Motion by Councillors T McEwan and S McCole 
To accept the recommendations as set out in the report, with clarity to be
provided around the figures in Section 5.2. 
Amendment by Councillors J Duff and B Brawn 
Reject the recommendations and continue with the current, separate
processes for applications.  In addition, any CIF underspends should be retained
within the relevant wards and carried forward to the 2025/26 CIF fund. 
In terms of Standing Order 21, a roll call vote was taken: 
8 Members voted for the Motion as follows:
Councillors P Barrett, I MacPherson, C Mair, S McCole, T McEwan, Bailie C
McLaren, Councillor J Welch and Bailie M Williamson. 
7 Members voted for the Amendment as follows:
Councillors B Brawn, D Cuthbert, J Duff, A Forbes, I James, F Smith and C
Stewart. 
Resolved:
In accordance with the Motion. 
~~~~~~~~~
Page 8 of 144

Page 9

HOUSING AND SOCIAL WELLBEING 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No.25/243)
Please note that this statement sets out outstanding decisions of Council / this committee / sub-committee along with an update and estimated
completion date.  Actions which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then
agreement will be sought to its removal from the OBS. 
No  Date / Minute
Reference /
Report Number
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
Due/completed
Action
Expected
39. 11 June 2025 Item 4 – Police
Scotland End of
Year Performance
Report – April
2024-March 2025
Feedback to be
provided as
available in
relation to trial of
community
speed watch
cameras in Fife.
Circulated to Members
via email 10/09/2025.
Police Scotland COMPLETE 1 October
2025
40. 11 June 2025 Item 4 – Police
Scotland End of
Year Performance
Report – April
2024-March 2025
Further
information to be
provided
regarding
availability of
national courses
re wildlife crime
awareness.
Circulated to Members
via email 10/09/2025.
Police Scotland COMPLETE 1 October
2025
41. 11 June 2025 Item 4 – Police
Scotland End of
Year Performance
Report – April
2024-March 2025
Further data to
be provided in
relation to body-
worn video,
when available,
in connection to
levels of service
worker assaults. 
Circulated to Members
via email 10/09/2025.
Police Scotland COMPLETE 1 October
2015
42. 11 June 2025 Item 4 – Police
Scotland End of
Year Performance
Further
information to be
provided in
Circulated to Members
via email 10/09/2025.
Police Scotland COMPLETE 1 October
2025
4
Page 9 of 144

Page 10

No  Date / Minute
Reference /
Report Number
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
Due/completed
Action
Expected
Report – April
2024-March 2025
relation to
applications to
join Police
Scotland in
comparison to
previous years
and
family/generation
al connections, if
available. 
43. 11 June 2025 Item 5 – Scottish
Fire and Rescue
Service – End of
Year Performance
Report – April
2024-March 2025
Statistics re
Home Fire
Safety Visits to
be provided.
Circulated to Members
via email 24/09/2025.
Scottish Fire
and Rescue
Service
COMPLETE 1 October
2025
44. 11 June 2025 Item 5 – Scottish
Fire and Rescue
Service – End of
Year Performance
Report – April
2024-March 2025 
Further
information to be
provided in
relation to work
with partner
agencies and
input from NHS
Tayside Board in
relation to
healthy eating
messaging.
Circulated to Members
via email 24/09/2025.
Scottish Fire
and Rescue
Service
COMPLETE 1 October
2025
45. 11 June 2025 Item 9 – Locality
PB Funding –
2024/25
Breakdown of
online/in person
voting to be
provided in
relation to 5.1
Circulated to Members
via email 02/07/2025.
David Stokoe /
Housing and
Communities
COMPLETE 1 October
2025
Page 10 of 144

Page 11

No  Date / Minute
Reference /
Report Number
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
Due/completed
Action
Expected
Central and
North Perth.
46. 11 June 2025 Item 10 – Fairer
Communities For
All
Further
information to be
provided on how
new funding
process impacts
Government 1%
Participatory
Budgeting
targets.
Circulated to Members
via email 10/09/2025.
David Stokoe /
Housing and
Communities
COMPLETE 1 October
2025
47. 11 June 2025 Item 10 – Fairer
Communities For
All
Clarity to be
given regarding
Section 5.2 split
by ward / per
capita /
deprivation
allocation. 
EM Briefing Note issued
17/06 to H&SW
Committee Members.
David Stokoe /
Housing and
Communities
COMPLETE 1 October
2025
Page 11 of 144

Page 12

Page 12 of 144

Page 13

PERTH AND KINROSS COUNCIL 
Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________  
Committee or Board: Housing & Social Wellbeing Committee 
Date of Meeting: 1 October 2025 
Report Title: Strategic Housing Investment Plan 2026/27 – 2030/31 
Report Number: 25/244 
Report Author: James Ross, Interim Team Leader Housing Strategy,
housingstrategy@pkc.gov.uk 
Organisational Lead: Serge Merone, Strategic Lead, Economy,
Development & Planning and Elaine Ritchie, Strategic
Lead, Housing & Communities
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to seek approval of the Strategic Housing
Investment Plan 2026/27 – 2030/31 set out in Appendix 1. The plan sets out
the investment priorities for affordable housing over a 5-year period from
2026/27. 
1.2 Sections 
The report is structured over the following sections: 
1. Purpose
2. Recommendations
3. Background/Context
4. Proposals
5. Conclusion
6. Impact Value Assessment
7. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Approve the content of the Strategic Housing Investment Plan 2026/27 –
2030/31 (Appendix 1) and its submission to the Scottish Government.
7
Page 13 of 144

Page 14

2.2 Approve ongoing development of the Strategic Housing Investment Plan and
give delegated authority to the Strategic Affordable Housing Board to ensure
that where projects fall out of the plan, alternative projects are prioritised. 
3. Background/Context 
3.1 The context for the Strategic Housing Investment Plan (SHIP) is set within the
national context of Housing to 2040 which is the Scottish Government’s long-
term vision and strategy for housing, which seeks to ensure that everyone has
access to a safe, efficient home that is affordable and meets their needs in the
place they want to be. 
3.2 In the local context, the Local Outcomes Improvement Plan and Corporate
Plan, which set priorities for the Council and its partners and identify the
importance of delivering new affordable homes to meeting those priorities.
The Council’s Local Housing Strategy (LHS), which was approved at the
Housing & Social Wellbeing Committee on 15th March 2023, sets out the
vision and priorities for housing in Perth and Kinross, some of which, the SHIP
seeks to deliver on. 
3.3 The SHIP sets out the investment priorities for affordable housing over a 5-
year period and how the strategic vision set out within the Local Housing
Strategy (LHS) to ‘provide more homes at the heart of great places’ will be
achieved. The LHS sets out an annual target of 210 new affordable homes to
be delivered in Perth and Kinross. 
3.4 In the first three years of the LHS, 220 affordable homes were delivered in
2022/23, 173 in 2023/24, and 264 in 2024/25. The projection for 2025/26 is
182 affordable homes will be delivered. 
3.5 The SHIP sits alongside the LHS as one of its core delivery mechanisms. It
has been developed through engagement with tenants and community
members, relevant Council Services, the Health and Social Care Partnership,
developers and the following Registered Social Landlords (RSLs): 
· Hillcrest Housing Association
· Kingdom Housing Association
· Places for People
· Caledonia Housing Association
· Ark Housing Association 
Perth and Kinross tenants say ‘This is a very detailed report with lots of 
complexities and considerations. It is a comprehensive review and with very 
helpful future projections’ 
3.6 The Council prepares the SHIP annually in its role as Strategic Housing
Authority. It ensures that the Council, and its partners, deliver housing that
meets the needs of the community, reflecting and aligning with outcomes and
housing policies as set out in our LHS. 
Page 14 of 144

Page 15

3.7 Affordable housing within the SHIP includes new build projects, refurbishment
and renovation projects, off the shelf acquisitions and buybacks which are
delivered in following tenure types to meet local needs: 
· Social Rent
· Mid-Market Rent
· Shared Equity 
3.8 The Scottish Government will use this information to draft a Strategic Local
Programme (SLP) Agreement which, once agreed, will form the basis of the
Council and our Partner Programme Agreements. 
3.9 Each year the Scottish Government provide a Resource Planning Assumption
(RPA), which is the funding allocated to help deliver affordable housing in
each council area. The funding for Perth and Kinross for 2025/26 was
£16,634,000. Currently, there is no confirmed RPA for 26/27 and beyond and
so the RPA for 25/26 has been used as the assumed grant allocation across
the 5 years of the SHIP. 
3.10 All projects identified as priorities for funding over the 5-year period are
identified within Appendix 3. These projects have been recorded on the
Scottish Government’s Housing and Regeneration Programme (HARP)
system. 
4. Proposals 
4.1 The SHIP 2026/27 – 2030/31 is set out in the appendices, with the selected
projects contained in appendix 3 with a notional grant allocation listed to
demonstrate the funding required. The grant allocations are based on
estimates using benchmark figures. The table in appendix 3 does not include
any sites that have no funding during the SHIP years and so projects currently
onsite, or due to go onsite this year with no grant funding allocated in 2026/27
or beyond, are not included in that table. 
4.2  The SHIP 2026/27 – 2030/31 has been over-programmed by 39% to allow for
slippage. Scottish Government guidance indicates that plans should be over
provisioned by a minimum 25%.
Page 15 of 144

Page 16

4.3  Appendix 2 sets out in detail the anticipated starts and completions over the
5-year period; however, the headline outputs are listed in the table below. 
Financial Year Starts (including
buybacks)
Completions (including
buybacks) 
25/26 323 182
SHIP Period 26/27 – 30/31
26/27 283 270
27/28 374 333
28/29 231 302
29/30 135 329
30/31 137 186
Total 1160 1420
Yearly Average 231 284 
4.4  Projecting yearly outputs can be challenging and subject to change, however
based on current projections the LHS target of delivering 210 new affordable
homes can be delivered through this SHIP. However, it relies on PKC
ensuring that the full RPA is drawn down each financial year and continues to
support the community led housing projects that are set out in the
appendices. The Programme is operating in a difficult environment, with
stretched finances across the board and one year funding settlements from
the Scottish Government restricting long term planning. Alongside this,
difficulties faced in the private sector, and land supply constraints all
contributing to a challenging environment. 
4.5  Once approved, the SHIP will be submitted to the Scottish Government
through the HARP system before the required date of 31st October 2025. 
4.6  The appendices will be published on the Perth and Kinross Council website
so that the public can easily find the approved Strategic Housing Investment
Plan 2026/27-2030/31. 
5. Conclusion/Rationale for Recommendations made in Section 2 
5.1 The SHIP, as per the appendices, outlines the investment plan for affordable
housing in Perth and Kinross for 2026/27 – 2030/31. As outlined in
recommendation 2, it is important that delegated powers are sought to allow
for changes in the housing market and sites not developing as expected. 
Page 16 of 144

Page 17

6. Impact Value Assessment 
Strategic_Housing_Investment_Plan_SHIP_2026_27.pdf 
7. Appendices 
7.1 Appendix 1 – Strategic Housing Investment Plan 2026/27 – 2030/31 
7.2 Appendix 2 – SHIP Delivery Tables 
7.3 Appendix 3 – SHIP Funding Tables 
7.4 Appendix 4 – Empty Homes Returns 
7.5 Appendix 5 – Prioritisation Framework 
Page 17 of 144

Page 18

Page 18 of 144

Page 19

Appendix 1
Perth and Kinross Council 
Strategic Housing Investment Plan
2026/27 – 2030/31
“Everyone in Perth and Kinross has access to the right home, in
the right place and at the right cost” 
7
Page 19 of 144

Page 20

Contents 
1. Introduction
2. Strategic Context
3. Housing Need and Demand 
4. Available Resources
4.1 Affordable Housing Supply Programme
4.2 Housing Revenue Account (HRA)
4.3 Developer Contributions
4.4 Council Tax Reserve Income from the Reduction of Discount for Empty and
Second Homes
4.5 Housing Infrastructure Fund (HIF)
4.6 Vacant and Derelict Land Investment Programme (VDLIP)
4.7 Rural Housing Fund
4.8 Affordable Rural Homes for Key Workers Fund
5. Affordable Housing Delivery
6. Connection with other LHS priorities
6.1 Empty Homes
6.2 Gypsy Travellers
6.3 Child Poverty
6.4 Rapid Rehousing Transition Plan (RRTP)
6.5 Accessible Homes / Supported Housing
6.6 Rural / Community Led Housing 
6.7 City / Town Centre Living
6.8 Energy Efficiency
7. Partnership Working, Consultation and Monitoring
8. Affordable Housing Policy
9. Prioritisation Framework
10. Development Constraints
11. Procurement Approaches
12. Equalities
13. Strategic Environment Assessment 
Page 20 of 144

Page 21

1. Introduction
The Strategic Housing Investment Plan (SHIP) 2026/27-2030/31 outlines investment
priorities for new supply affordable housing over five years, aligning with the outcomes set
out in the Local Housing Strategy (LHS) 2022-2027. 
The SHIP is designed to be a working tool which:
• Improves long-term strategic planning.
• Details how investment in affordable housing will be directed.
• Sets out key investment priorities for affordable housing and demonstrate
how these will be delivered and then resourced. 
• Forms the basis for detailed programme planning.
• Focuses on partnership working.
• Informs Registered Social Landlord (RSL) development funding plans.
• Allocates resources from a national to a local authority level.
• Reinforces the local authority’s role as the strategic housing authority.
The Council and its partners are committed to overseeing a programme of new affordable
housing that will contribute to the Scottish Government’s Housing to 2040 ambitions for
new affordable homes. To support this, the Scottish Government have confirmed a Resource
Planning Assumption (RPA) for Perth and Kinross for 2025/26 of £16,634,000, however, this
SHIP period covers 2026/27–2030/31, where no funding has yet been announced. 
All projects identified as a priority for funding over this 5-year period are set out in appendix
3 and are recorded in the Scottish Government’s Housing and Regeneration Programme
(HARP) system. 
Projects included within the SHIP will be delivered through new build, buybacks,
regeneration, renovation, and remodelling. The Scottish Government will use this
information to draft a Strategic Local Programme Agreement (SLPA). 
2. Strategic Context 
Housing to 2040 sets out the Scottish Government’s vision that everyone in Scotland should
have access to a warm, safe, affordable and energy efficient home that meets their needs in
a community they feel part of and proud of. The strategy is based on the principles of social
justice, equality and human rights and includes a target to deliver 110,000 affordable homes
in the 10 years up to 2031/32, with 70% of these for social rent.
The Perth and Kinross Local Housing Strategy (LHS) 2022-27 has been informed by the
themes and aims set out in Housing to 2040 and aims to deliver on the vision that “Everyone
in Perth and Kinross has access to the right home, in the right place, and at the right cost”. 
Page 21 of 144

Page 22

The four main priorities set out in the Perth and Kinross LHS 2022-27 that this plan helps to
support are: 
• LHS Priority 1: Providing more affordable homes to support liveable and sustainable
communities. 
• LHS Priority 2: Providing a range of housing options that people can easily access,
afford, and keep. 
• LHS Priority 3: Delivering housing for people with varying needs. 
• LHS Priority 4: Delivering quality homes with affordable warmth, zero emissions, and
SMART technology.
In addition to ‘Housing to 2040’ vision, the SHIP considers the Scottish Government’s
Housing and Planning Delivery Framework (HPDF).  This framework promotes better
collaboration between Housing and Planning Services, focusing on the Local Housing
Strategy, Housing Need and Demand Assessment and Scottish Planning Policy
The National Planning Framework 4 (NPF4) has been adopted, setting national planning
policies and a development plan for Scotland. Along with other key documents like the Local
Development Plan (LDP) and the Housing Land Audit (HLA), NPF4 has guided the investment
decisions in the SHIP and ensures a steady supply of future projects.  
The SHIP also aligns with the aims of the Perth and Kinross Integration Joint Board Strategic
Commissioning Plan 2020-2025. The Housing Contribution Statement, which acts as the
bridge between the LHS and the Strategic Plan, reflects how housing contributes to the
Strategic Plan priorities, emphasising the importance of providing suitable housing and
support to help people live independently. 
This includes:
• Working with housing developers to build adaptable, sustainable housing for
changing household needs. 
• Ensuring residents and tenants can adapt their homes to meet their medical needs.
• Providing sheltered housing accommodation and support.
• Ensuring suitable housing and housing support is available to prevent admissions and
prolonged stays in hospital and engage early with partners to deliver a seamless
service for people discharged from hospital.
• Supporting residents to live in warm, dry, energy-efficient and low-carbon homes
that are affordable to heat.
• Working in partnership with a range of services such as Adult Support and
Protection, Mental Health, Drug and Alcohol Teams to prevent and address
homelessness. 
Page 22 of 144

Page 23

3. Housing Need and Demand 
The Perth and Kinross Housing Need and Demand Assessment (HNDA) was conducted in
2021 across Tayside, including Angus, Dundee, Perth and Kinross and Northern Fife. A report
based on the HNDA was presented to the ‘Housing and Social Wellbeing Committee’ in
March 2023, outlining the Housing Supply Targets. 
The Housing Supply Target is incorporated into the LHS as an annual target over five years.
This determines the scale and type of affordable housing required to meet housing need and
demand throughout the LHS period. 
The LHS has set a target of 210 new supply affordable homes per year. This is across a range
of delivery types including new build, buybacks, conversions, remodelling and empty homes,
by both council and RSL partners with a mix of social rent and other tenure, e.g. shared
equity, mid-market rent (MMR). 
For development planning purposes, the Perth and Kinross housing market is divided into
five Housing Market Areas (HMAs). These are:
• Greater Perth
• Highland
• Kinross
• Strathearn
• Strathmore & The Glens
Currently there are no specific housing supply targets for these HMAs.  
4. Available Resources
4.1 Affordable Housing Supply Programme (AHSP)
The Affordable Housing Supply Programme is part of the Scottish Government’s More
Homes Scotland approach.  It aims to increase affordable homes across all tenures and meet
the objectives set out in ‘Housing to 2040’. This Programme supports the Council in
delivering its affordable housing priorities.  The SHIP sets out investment priorities over a 5-
year period, and these priorities then inform the Strategic Local Programme Agreements
(SLPA’s). The SLPA is a 3-year programme, containing SHIP projects, with year one being the
finalised list of projects with approval to make applications for funding from the Scottish
Government. There are published grant benchmark rates for these applications with figures
varying depending on location, tenure, applicant, and provision of additional quality
standards. 
To support the delivery of affordable homes, local authorities are provided with Resource
Planning Assumptions (RPAs) by the Scottish Government. RPAs are the yearly grant
allocation that helps finalise the programme and act as a guide for planning over the 5-year
period of the SHIP. The RPA for 2025/26 is £16,634,000, however there has been no funding
announcement for any year beyond that. 
Page 23 of 144

Page 24

The £16,634,000 is made up of the £16,587,000 from core RPA funding and the remaining
£47,000 from the additional £40,000,000 that was made available for acquisitions. Whilst
the core RPA funding was split across the local authorities in the same manner as previous
funding allocations, the additional £40,000,000 was split across the local authorities
differently which left PKC with only a nominal amount. Rather than using the previous model
,which considered four indicators; affordability, deprivation, rurality and homelessness, the
new model only considered homelessness. This means that 80% of the monies available
were given to the 5 local authorities that had the ‘highest current and sustained temporary
accommodation pressures for the last three years (Edinburgh, Fife, Glasgow, South
Lanarkshire, and West Lothian).’ With the remaining 20% being split amongst the remaining
local authorities. The methodology used to identify the specific split between the local
authorities again was not the previous model but one that considered the scale of the
temporary accommodation crisis in each authority. Whilst it is disappointing that PKC
received less funds than most other local authorities, it highlights the good work done by
the Housing Service, under enormous pressure, to respond to homelessness faced by people
within our communities. 
A lack of future funding certainty is one challenge that needs to be managed carefully as this
has the potential to slow down the pace of developments and necessitates the adoption of
carry forward restrictions, as there is no certainty about how much grant will be made
available next year. However, the recent announcement by the Cabinet Secretary for
Housing and the Minister for Public Finance committed to providing multiyear funding
allocations and so the expectation is that this will be addressed. Regular discussions with the
Scottish Government, partner RSLs and developers are being had to methodically work
through options to ensure sustained delivery in difficult financial circumstances. 
The Scottish Government guidance is that minimum 25% over provision should be built into
the programme. This SHIP has been over provisioned by 39% to ensure our full grant
allocation is met and account for any slippage that is, naturally, likely to occur. The level of
over provision has been deemed appropriate, based on recent delivery outputs, and the
level of slippage seen previously. The SHIP has been front loaded with space in later years
should projects slip and a notional grant allocation has been attributed to each project at
benchmark levels to demonstrate that we are effectively planning the programme. Running
parallel to the SHIP is a programme of ‘pipeline’ projects, this both ensures a good supply of
projects to come into future SHIP’s as well as reflecting a focus on projects that are
deliverable. 
Whilst this SHIP is predominantly new build, PKC has a target to deliver 40 buybacks per year
and encourages partner RSLs to identify opportunities to do this also, where it meets their
strategic needs. Buybacks not only increase the supply of good quality affordable housing in
areas of need but can also reduce maintenance costs by targeting those properties that
bring majority or full ownership of a block back. These properties are typically 1, 2, or 3 bed
properties and can meet the housing needs of a variety of households, including those with
a medical need. 
Page 24 of 144

Page 25

Whilst the target is typically 40 per year, it has in years 24/25 and current year (25/26) been
purchasing over and above this number to maintain a healthy supply of new affordable
housing. So, whilst the target of 40 per year is listed in this SHIP, there will continue to be a
larger number purchased per year if required. 
The Council, in consultation with the Scottish Government, will continue to manage the
AHSP in conjunction with its Housing Capital Plan, Housing Revenue Account investment,
Council Tax 2nd Homes Funds, and Commuted Sums to maximise the delivery of affordable
housing in priority areas during the SHIP period.
4.2 Housing Revenue Account (HRA) 
Prudential borrowing via the HRA is a key funding component used in addition to Scottish
Government housing subsidy to support the delivery of Council affordable homes. The
financial viability of all potential Council projects is assessed in terms of the Housing
Revenue Account 30-year business plan.  This ensures that the capital costs generate a
reasonable return on investment over the long term. The new build programme is
monitored as part of the HRA capital monitoring process between Finance, Housing, and
Property. The Council has a new build programme target of 80 new build affordable homes
per annum during the 5-year period of this SHIP.
4.3 Developer Contributions 
Criteria for Affordable Housing obligations, including commuted sums, are set out in PKCs
Developer Contribution and Affordable Housing Supplementary Guidance.  
There is currently around £1million available from Developer Contributions to support
delivering affordable housing initiatives throughout Perth and Kinross. These funds can be
used to augment grant funded projects to become viable and, where appropriate, can be
considered as a complement to Scottish Government More Homes housing subsidy. The
developer contributions need to be spent within that housing market area in which they
were raised. 
Applications for Developer Contributions can be made to PKC Housing Strategy to support
the delivery of affordable homes. 
In 2024/25, PKC Housing Services utilised £550K to purchase 4 new affordable homes off-
the-shelf in Kinross HMA and £60K towards PKCs Buyback initiative.  In addition, some
smaller awards were made towards feasibility studies and rural housing initiatives.
4.4 Council Tax Reserve Income from the Reduction of Discount for Empty and Second
Homes 
The Council has funding available through income raised each financial year from Council Tax
(Empty Homes and 2nd Homes). This funding assists in supporting the provision of all
affordable homes delivered by the Council (new build and Empty Homes) and new builds for
RSLs. PKC have, from 1st April 2024, implemented a 100% council tax surcharge on second
homes, with the aim being to re-invest this money to improve housing opportunities.
Page 25 of 144

Page 26

As of 1 April 2025, the balance of funds from Council Tax for the delivery of affordable
housing was £4,800,000. Since 2015/16 through the delivery of new build affordable
housing and Empty Homes, the Council has used funding of over £12m from the Council Tax
to assist with the delivery of affordable homes. For new supply affordable homes, these
funds, as well as developer contributions, are used on a case-by-case basis depending on the
nature and funding position of the project.
These funds have supported a number of affordable housing projects and a commitment has
been made to continue to support delivery of affordable housing through this SHIP.  
The table below lists the projects that have been, or will be, supported with a financial
contribution via this fund. 
Previous Delivery 
Site  Total New Homes Organisation  Year 
Fairfield, Perth 18 PKC / KHA 22/23
Lynedoch Road, Methven  24 PKC 22/23
Hazelwood, Blairgowrie   22/23
Lynedoch Road, Methven  17 PKC 24/25
Kinross Off the Shelf 6 PKC 24/25
Dunkeld NTS 20 PKC 24/25
Glenalmond Road, Rattray 18 PKC 25/26
Future Delivery 
Broich Road, Crieff Off the Shelf  12 PKC 25/26
Westpark, Blairgowrie Off the
Shelf
4 PKC 25/26
East of St Cedds Road,
Ballinluig
25 PKC 26/27
Captains Glen, Bridge of Earn 29 PKC 26/27
Colonsay Resource Centre,
Perth
12 PKC 26/27
Balhousie Perth 46 PKC 26/27
Beechgrove, Perth  41 PKC 26/27
Captains Glen, Bridge of Earn 30 PKC 26/27
Borlich, Aberfeldy 33 PKC 27/28
Captains Glen, Bridge of Earn 30 PKC 27/28 
Beyond supporting specific affordable housing projects, and the operation of PKC’s Empty
Homes service, the funds are also cover some staffing costs within Housing Strategy, as well
as contributions to Council Tax and Missing Shares posts. 
Page 26 of 144

Page 27

4.5 Housing Infrastructure Fund (HIF)
The HIF funds stalled housing developments due to the excessive cost or nature of the
infrastructure works required.  Whilst PKC has considered use of this fund to enable some
sites, none have been deemed suitable by the Scottish Government to progress.  No suitable
sites have been identified for HIF funding in this SHIP, however, consideration will be given as
and when potential sites become known or available. 
4.6 Vacant and Derelict Land Investment Programme (VDLIP)
The Low Carbon Vacant and Derelict Land Investment Programme (VDLIP) offers funding to
transform long-term vacant and derelict sites. However, due to the current unprecedented
pressure on capital investment budgets across the public sector this fund is currently
paused. There are no projects in this SHIP being funded by VDLIP, largely due to the lack of
sites that fall into this category within Perth and Kinross, however regeneration is a key
component of this SHIP and aligns with Housing to 2040’s ‘brownfield first’ approach. Over
the course of this SHIP, we project that 334 new affordable homes can be delivered on
brownfield sites, which is 27% of new build delivery over this 5-year plan. There will be 72
new affordable homes delivered on sites that are on the Vacant and Derelict Land Register. 
PKC have adopted a policy whereby priority is given to affordable housing as an end use,
when disposing of its surplus land or buildings. This reflects the ambition to enhance the
provision of affordable housing on brownfield sites and move towards achieving the LHS
ambition to deliver 50% of affordable homes on brownfield sites. 
Whilst there are no housing sites with VDLIP funding attached to them, support was
provided to a local development trust in Alyth to assist in the award of VDLIP funding for the
‘Millhaugh Phase 1’ project, which will see the redevelopment of an unused sawmill into a
community space. 
4.7 Rural & Islands Housing Fund (RIHF)
PKCs Housing Strategy Team, alongside rural specialists Communities Housing Trust, is
actively working with six Community Development Trusts to support Community-Led
affordable housing and deliver new affordable homes in rural Perth & Kinross. 
Since 2022, PKC has undertaken a Housing Needs Assessment Programme (HNAP), delivered
by CHT.  To date, Housing Needs Assessments have been carried out in seven settlements
across Perth & Kinross, these are:
• Dunkeld and Birnam
• Pitlochry
• Mount Blair
• Aberfeldy
• Comrie 
• Kinloch Rannoch 
• Blair Atholl
Page 27 of 144

Page 28

Current live projects supported by RIHF include:
• 12 new affordable homes in Kinloch Rannoch, where In Principle Planning has been
secured and full planning permission will be sought in October 2025
• 10 new affordable homes in Aberfeldy, where Planning Consent will be sought for in
October 2025
In addition, PKC’s Housing Strategy and Communities Housing Trust are exploring several
candidate sites with Pitlochry Community Action Trust, Dunkeld and Birnam Community
Development Trusts and are also supporting Blair Atholl & Struan Community Council to
establish a Community Development Trust or Scottish Charitable Incorporated Organisation
to deliver new affordable homes
Typically, RIHF funds are secured alongside other funding such as Scottish Land Fund,
charitable trusts and Housing Subsidy.  Community-Led housing helps address a lack of
affordable homes in rural areas and aligns with the Scottish Government’s Rural & Islands
Action Plan (2023).  Typically, there is fewer housing sites brought forward in these locations,
and small rural communities can have varying types of housing need that is often better
addressed by enabling those that live and work in these communities, to deliver new,
affordable homes. 
4.8 Affordable Rural Homes for Key Workers Fund
Up to £25 million across Scotland is being made available from the Affordable Housing
Supply Programme budget over 2023 to 2028 for the Rural Key Workers Housing Fund. The
funding enables local authorities and RSLs to purchase existing suitable properties in rural
areas which can be rented directly or leased to employers to provide affordable homes for
key workers. Opportunities to utilise this fund on bulk purchases are being explored to
ensure that key workers can be housed in the areas of identified need.  
The updated common allocations policy in Perth and Kinross includes ‘people unable to take
up a key worker job offer due to affordable housing not being available’, as a strategic need
category, that provides the applicant with a high priority for re-housing. This enables access
to social rented sector for key workers requiring affordable housing, where this is deemed
necessary. 
A survey is now underway via Health and Social Care Partnership to identify areas of key
worker need within the care sector and enhance the evidence base that has been accrued
via the Housing Needs Assessments done in some of our rural locations. Consideration will
also be given to Local Lettings Initiatives in locations where new supported housing
developments are being built to ensure suitable staff resource. PKC will work with partners
delivering Mid-Market Rent also to ensure that new supply can be targeted towards key
workers in areas of identified need. This will be done by coordinating both with the Council’s
Housing Options Service and the Health and Social Care Partnership. 
Page 28 of 144

Page 29

5. Affordable Housing Delivery 
The programme, outlined in appendix 3, is based on operating at 139% of the current RPA.
This approach is taken to effectively manage slippage and the outputs listed in the table
below should be considered on that basis. 
The table in appendix 2 contains expected delivery data for the 5-year period, and below is
the headline data from that table. 
Financial Year Starts (including buybacks) Completions (including
buybacks) 
25/26 323 182
SHIP Period 26/27 – 30/31
26/27 283 270
27/28 374 333
28/29 231 302
29/30 135 329
30/31 137 186
Total 1160 1420
Yearly Average 231 284 
Projecting yearly outputs can be challenging and will be subject to change, however based
on current projections the LHS target of delivering 210 new affordable homes can be
delivered through this SHIP period if the funding levels remain at 25/26 levels throughout
the lifetime of the SHIP. However, it relies on PKC ensuring that the full RPA is drawn down
each financial year and continues to support the community led housing projects that are
set out below. The programme is designed so that should monies become available over and
above our RPA, then we are able to claim that and bolster our outputs. 
6. Connection with other LHS priorities
6.1 Empty Homes
Having empty homes as an integral part of affordable housing provision ensures a
coordinated approach within Perth and Kinross. The Council’s aim is to bring 135 privately
owned empty properties back into use each year. The Vacant Property Team and the Private
Sector Housing Team work collaboratively to deliver an Empty Homes Service that provides
advice and assistance to owners of long-term empty properties and work towards set
targets. The Empty Homes Service covers both residential and non-residential properties to
provide a holistic approach to solving the problems caused by empty buildings. The Private
Sector Housing Team works in tandem with the Housing Options Team to ensure empty
homes are targeted in appropriate areas and to those in housing need. 
Our Empty Homes Initiative grants, administered by our Private Sector Housing Team,
enable owners to upgrade or repair their properties in return for the properties being let out
at Mid-Market Rent levels (below LHA rates) for a 5-year period, which both returns an
empty property to use and increases the supply of affordable housing. 
Page 29 of 144

Page 30

These properties are let through the Rent Bond Guarantee Scheme which aims to help
people access housing opportunities in the private rented sector. In 2024/25, 23 Empty
Homes Initiative grants were issued to owners to repair or renovate their properties with a
view to them being let out at Mid-Market Rent levels.  Furthermore, through Vacant
Property Feasibility Grants, funding of professional fees for owners allows them to
undertake feasibility studies to enable repairing or re-purposing of their empty properties. 
The Scottish Government guidance on the SHIP content, specifies that we should set out an
overview of the numbers of empty homes brought back into use, with the assistance of the
Council, over the last three financial years. However, this is already reported yearly to Empty
Homes Partnership, operated by Shelter Scotland on behalf of the Scottish Government.
Though to adhere to the Scottish Government Guidance, this information is listed in
appendix 4. Whilst these figures reflect the recorded empty homes being returned with
assistance by PKC, they do not show the actual reduction in empty homes that has taken
place over recent years. Between 2021 and 2025, there was a reduction in long term empty
homes of 358. Whilst it should be noted that this number will fluctuate slightly depending
on the dates in which the data is extracted, the broad trend has saw a reduction. 
6.2 Gypsy Travellers
Gypsy Travellers have travelled through Perth and Kinross for centuries and many have in
more recent times settled within the community as residents. Perth and Kinross Council
have a ‘Perth and Kinross Gypsy/Traveller Action Plan – 2023-27’, that establishes a range of
outcomes it hopes to achieve, to enable the community to flourish. 
There are two permanent sites operated by PKC, Double Dykes and Bobbin Mill, providing 26
units of chalet-style accommodation. The two PKC sites were transferred into the HRA in
2022, which will enable planned maintenance programmes to ensure Scottish Housing
Regulator standards are maintained. There are no temporary or short stay pitches on these
sites and occupancy levels at these sites are typically 100%. There are also 24 pitches across
3 private sites. 
A major capital project at the Double Dykes site is underway to replace the 20 chalets with
high-quality, energy efficient accommodation. This transformative project will not only
upgrade the accommodation itself but also the services, boundaries, pathways, drainage and
amenity space. PKC secured nearly £4m in funding from Scottish Government’s
Gypsy/Traveller Accommodation Fund, with the remaining cost being covered by the
Housing Revenue Account (HRA).  The development is being done in 3 phases to minimise
disruption to residents and is progressing well with a completion due this calendar year.
Feasibility studies have been undertaken at Bobbin Mill to establish what improvements can
be made and engagement with residents has already commenced to review these proposals
and establish next steps. 
Page 30 of 144

Page 31

The Local Housing Strategy 2022-2027 established a need to ‘Work with Gypsy/Traveller
community members to have a better understanding of their accommodation needs and
preferences and explore and develop workable solutions’.  This work will continue as part of
the emerging Local Development Plan (LDP3) and will involve representatives from Planning
and Housing establishing need to ensure that the supply of suitable sites is identified. 
It was however already established that a transient site was required, and so PKC undertook
a site assessment appraisal via the Urban Capacity and Brownfield study, to consider the
available options. Plans were then developed for the preferred site in consultation with the
gypsy traveller community, and a planning application is due to be submitted soon. 
6.3 Child Poverty 
The Council’s Child Poverty Action Report prioritises new affordable housing in areas with
high child poverty. This helps those in need access quality homes, improving life chances. In
2024/25 there were 12 new properties delivered in the Scottish Index of Multiple
Deprivation (SIMD) lowest quintile (lowest 20%), reflecting 11% of new build delivery. Over
this 5-year SHIP, there is projected to be 160 new supply properties funded in SIMD lowest
quintile (lowest 20%), which equates to 13% of new builds being given grant assistance. 
However, as the Child Poverty Action Plan 2023/24 highlights, the SIMD identifies deprived
areas, not people, and this can be problematic for Perth and Kinross due to having
substantial rural areas where poverty is dispersed. A focus on rural areas where housing
costs are high is also important to alleviate pockets of child poverty, particularly those within
the six recognised priority groups at greatest risk of poverty. These are, minority ethnic
families, lone parent families, families with a disabled person, families with three or more
children, families with children under 1, families with mothers aged 25 or under. The
delivery of adapted housing is set out below, though in 2024/25, 41 of the new build
properties were delivered with 3+ bedrooms, making them suitable for larger families, this
equated to 38% of new build delivery. Projections for this SHIP are that 334 new build
properties will be delivered suitable for larger families, which is 27% of this plan. It should be
noted, that as this is a 5-year plan, some projects are further progressed than others and
some do not have a finalised design. This means that the figures used are based on current
plans / estimates and subject to change. 
Using Common Housing Register waiting list information can be difficult as applicants choose
several areas for rehousing, however this data can help negotiate the housing mix for new
sites to ensure larger family homes are provided where needed.
Perth and Kinross Council have a Child Poverty Working Group that seeks to ensure that
there is a collaborative approach to reducing child poverty within our communities. Part of
this approach is identifying key areas of need, and a recent report, using a variety of data,
highlighted, by school catchment, those areas most in need, or at risk of child poverty.
During the lifetime of this SHIP, there is projected to be 160 new build homes delivered in
the top 5 school catchment areas that are most at risk of facing child poverty. 
Page 31 of 144

Page 32

Achieving a reduction in child poverty is a clear aim of the Local Housing Strategy, and
Strategic Housing Investment Plan. Affordable housing enables more households to have the
opportunity to reduce their housing costs and free up more of their income on other
essentials for their children. 
Beyond the provision of new supply affordable housing contained in this SHIP, PKC has
• Provided 564 households with a financial payment toward their rent arrears balance,
via its Tenancy Sustainment Fund
• Via Citizens Advice Bureau, supported a total of 677 tenants with a financial gain of
£784,052, through its Financial Inclusion Project.
• Supported a total of 172 households with a spend of £29,950, via the ‘Think Yes’
budget.  This fund is used by Locality Housing Teams to help meet the costs of
moving into a new home.
• Supported 35 households in the PRS to sustain their tenancies through the Private
Sector Sustainment Fund with a spend of £37,521.24.
• Provided 880 P&K households with energy efficiency and/or low carbon heating
advice, via SCARF. 317 of these households were in fuel poverty, and the resulted
savings, removed 9.1% of these households from fuel poverty.
6.4 Rapid Rehousing Transition Plan (RRTP)
Adopted in April 2019, the PKC’s Rapid Rehousing Transition Plan (RRTP) aims to prevent
homelessness and minimise its impact.  It supports the Local Housing Strategy, is an integral
part of the Strategic Housing Investment Plan (SHIP) and influences the delivery of the
Health and Social Care Partnership’s Strategic Plan. 
The main objective within the RRTP is:
To deliver a service which is focussed on preventing homelessness and minimising the
impact of homelessness where it cannot be avoided.  This is achieved by continuing to: 
• intervene early and prevent homelessness through enhanced advice, assistance and
support.
• offer and provide a route for homeless people to move directly to settled
accommodation.
• reduce the need for temporary accommodation and minimise the length of time
people spend in temporary accommodation where it cannot be avoided.
Increasing the supply of suitable affordable housing will assist in meeting the RRTP strategic
aims of prevention of homelessness. It will also support the commitment to ensuring that
those in housing need find the fastest route to safe and secure accommodation and help
them resettle in their new homes quickly and successfully with support. Strong partnership
working with Housing will ensure that new housing through the SHIP reflects the required
needs of people facing homelessness. 
6.5 Accessible Homes / Supported Housing 
Page 32 of 144

Page 33

In 2019 the Scottish Government published ‘Guidance for setting of Local Housing Strategy
(LHS) targets to support the delivery of more Wheelchair Accessible housing’. Following on
from this, the PKC LHS 22-27 set out a target that 10% of new build affordable homes to be
wheelchair accessible or adaptable standard.   
In 2024/25, 1 fully wheelchair adapted property was delivered via the SHIP with 12 adapted
properties suitable for older / ambulant disabled households, which was 10% of new build
delivery for the year. PKC will continue to work with developers and partner RSLs at an early
stage in developments to achieve this target and enhance the provision of adapted
properties in the locations that they are most needed. Over the course of the 5-year SHIP,
128 fully wheelchair adapted properties will be funded, which equates to 10% of new build
delivery. 
Achieving a target such as this can be challenging as many developments not achieving the
10% will already be in the SHIP at a progressed stage. Where this is the case, and where
appropriate, an amendment to planning, or new application will be made to ensure this
target is met. Off the shelf opportunities often do not come with the required contribution
and so consideration needs to be given to, where possible, enhancing provision of those
sites with early involvement.
The current LHS 2022-27 plays a significant role in improving public health in Perth and
Kinross by setting the framework for delivering accessible homes, wheelchair homes and
particular models of provision such as supported accommodation for key groups. The LHS
also sets the framework for enabling people to live independently and well for as long as
possible through investment in property adaptations, technology, care, and support services.
The Council are also open to opportunities to invest in homes that are more attractive to age
in across tenures. There continues to be a need to develop projects which have adaptable
features, community spaces and flexible support services, filling the gap between
mainstream homes and homes for varying need. This will be particularly important in
meeting the emerging needs of those in rural areas. 
The Council submitted a response to the Scottish Government Housing for Varying Needs
(HfVN) Proposed Guidance Consultation (extended to Dec 2023), and plan to adopt new
guidance subject to further revisions and publication in order to continue to meet the needs
of these groups. 
For those who have been assessed as having care and support needs to live independently in
the community, a home in the right place can be crucial. PKC’s Housing Strategy Team works
closely with the Independent Living Panel (ILP), which provides an integrated approach to
meeting housing, health and social care needs for those people who have been assessed as
requiring support to enable them to live in the community. 
To ensure that appropriate accommodation can be planned for, referrals made to the ILP
inform the programme of new build provision for this group including identifying suitable
locations and primarily through consideration of the ‘core and cluster’ model of supported
Page 33 of 144

Page 34

accommodation where a Support Provider is based in a property and provides 24/7 shared
support to several individuals clustered around this. 
In 2023/24 a supported housing project, part funded via the SHIP, was delivered at Bertha
Park, Perth by Kingdom Housing Association to meet independent living needs. Another SHIP
project in Crieff, built by Hillcrest Housing Association, has just completed in 25/26. This will
provide a further eight properties for individuals with support needs as well as 24/7 staff
base.  There are several sites in the SHIP where supported housing opportunities are being
explored in collaboration with the Independent Living Panel and Housing Association
partners. 
6.6 Rural and Community Led Housing
PKC faces unique demographic challenges due to having a large rural population and a city
within its boundary. The LHS 22-27 sets out the aim that the Urban / Rural population split
(53%/47%) should be reflected in new affordable housing delivery. In 2024/25, 53% of new
affordable housing delivered through the SHIP was in urban areas, whereas 47% was in rural
locations, and so the split directly matched the target in the LHS. This SHIP will fund 610 new
affordable homes in rural areas with 646 in urban locations, which equates to a 51% / 49%.
Whilst these projections do not include buybacks or new delivery supported via the Rural
Housing Fund, the current projections are that the SHIP will largely reflect the urban rural
split set out in the LHS 22-27.
The SHIP is only one funding mechanism that can aid delivery of affordable housing. PKC’s
Housing Strategy Team works closely with communities to enable Community Led Housing
to be delivered through funding streams such as the ‘Rural and Islands Housing Fund (RIHF)’
and the ‘Scottish Land Fund’. These approaches not only allow greater community input into
the provision of affordable homes but also reduces reliance on the main programme grant. 
We have supported the completion of seven Housing Needs Assessments in rural areas to
identify the specific needs of these communities.  We are currently enabling a number of
local communities to deliver community led housing. 
Project Partner Planning
Status
RIHF Status Capacity Proposed
Site Start
Tenure
Aberfeldy
Town Hall
Locus
Breadalbane
Trust
Fully
Consented
Feasibility
& Capital
Approved
2 July 25 SR 
Kinloch
Rannoch
Rannoch
Development
Trust
24/00308/IPL Feasibility
Costs
Approved
12 Oct 25 Mixed
Former
Slaughterhou
se Site
Aberfeldy
Development
Trust
App to be
lodged Oct 25 
Feasibility
Costs
Approved
10 Oct-25 Mixed
Fishers Way,
Aberfeldy
Aberfeldy
Development
Trust
Fully
Consented
- 3 OTS
Purchase 
MMR
Page 34 of 144

Page 35

Blair Atholl
Railway
Station
Blar Atholl &
Strauan CC
- - 3 TBC TBC
St Cedd's Rd,
Ballinluig 
Communities
Housing Trust
App to be
lodged Oct 25
- 10 Feb-26 LCHO
Duntaylor
Ave,
Aberfeldy
Aberfeldy
Development
Trust
- - 10 Sep-27 Mixed
Cuil Forestry,
Aberfeldy
Aberfeldy
Development
Trust
- - 5 TBC Croft
UCBS0128 &
0132,
Pitlochry
Pitlochry
Community
Action Trust
- - 18 TBC Mixed
UCBS0119/1
24115234,
Dunkeld
Dunkeld &
Birnam
Development
Trust
- - 16 TBC Mixed 
6.7 City / Town Centre Living 
The LHS 22-27 identifies a target to deliver 53% new supply affordable housing in urban
areas and 47% in rural areas, as this reflects the population split of our communities. So,
whilst it is acknowledged that there is a substantial rural population, there is also a sizeable
urban population with a city and a number of large towns within our boundary. Many wish
to reside in town and city centre locations due to work opportunities, leisure activities,
access to services etc and so a focus on town centre living can boost the local economy and
community vibrancy.   In this SHIP, we are projecting that 129 new affordable homes will be
funded that are situated in or very near city and town centre boundaries of the Perth and
Kinross, as defined in the Local Development Plan. 
6.8 Energy Efficiency
The Council seeks to maximise energy efficiency and reduce fuel poverty by meeting the
‘Greener’ energy efficiency standard in new builds, where practical. To meet this standard,
homes must meet Section 7 Silver Standard Aspect 1 & 2 of the 2011 Building Regulations in
relation to Carbon Dioxide emissions and energy for space heating, as a minimum. 
The standard may not be achievable in all projects, particularly where an existing building is
to be redeveloped or where homes form part of a larger development for market provision
or through the PKC Buyback scheme. 
The Council supports RSL partners to develop to ‘greener standard’ as a minimum and,
where possible, to provide enhanced levels as set out within the Scottish Government’s
Housing to 2040 vision. 
The Council has published a new Design Guide for Sustainable, Inclusive Homes – a Net Zero
Approach, which aims to achieve, where possible, gold standard in energy efficiency. It must
Page 35 of 144

Page 36

be acknowledged however that costs can be barrier to this, and a balance between high
energy standards and ensuring a robust programme of new affordable homes is maintained. 
7. Partnership Working, Consultation and Monitoring
This SHIP has been developed through collaboration with the Scottish Government, RSLs,
and other stakeholders such as Health and Social Care Partnership and tenants’ groups.  
Housing and Planning are also key partners for the development and ongoing delivery of the
SHIP.  
PKC continues to have 6 weekly updates with the RSL partners to discuss affordable projects
both current and future opportunities. These meetings bring an opportunity for partners to
discuss the wider programme and strategic issues including updates from the Scottish
Government, Scottish Water, the SHIP, and site prioritisation. Every 6 weeks, updates are
provided to the Scottish Government on areas relating to planning, public utilities and
slippage impacting current/future year funding. PKC also host an Affordable Housing Supply
Programme Stakeholder meeting, which consists of Housing Strategy, Planning, RSL partners,
and the Scottish Government. This involves the group discussing the current year
programme alongside a range of other topics affecting the delivery of affordable housing in
Perth and Kinross. This is scheduled three times throughout the year at key points. Regular
contact is maintained outwith these set meetings to ensure a well-functioning programme is
maintained. 
PKC has established an LHS Delivery Group to ensure delivery of outcomes set in the LHS.
This Group feeds into the Strategic Affordable Housing Board, which provides oversight on
the delivery of Perth & Kinross’s Affordable Housing Supply Programme and ensures
implementation of new affordable housing objectives contained in LHS and wider national
strategies. The Board comprises senior managers and officers from Housing, Planning,
Property, and Finance alongside an RSL representative. 
In developing the SHIP 2026/27 – 2030/31, all RSLs were asked to submit project proposals
for any new sites. All proposals were assessed alongside Council projects using the SHIP
prioritisation Framework (see Appendix 5) and the programme was then approved by the
Strategic Affordable Housing Board.
As outlined above, the Perth and Kinross multi-agency Independent Living Panel (ILP)
provides key information to the SHIP to enable the provision of supported housing in the
most appropriate locations and in the correct form. The ILP meets monthly and is made up
of over 20 members working across Housing, Health and Social Care Partnership teams. The
Panel provides an integrated approach to meeting housing, health and social care needs of
people who have been assessed as requiring support to enable them to live as
independently as possible in their own home or within a specialist provision. 
The Council has frequent meetings with developers to discuss development sites and how
their developments can contribute to LHS priorities through inclusion in the SHIP. PKC’s
planning department also host a Housebuilders Forum to offer developers a space to discuss
Page 36 of 144

Page 37

issues ongoing within the sector. PKC’s Housing Strategy Team meet once a month with
planning colleagues to review and discus any issues related to the affordable housing supply
programme. 
The private sector plays a very important role in supporting the delivery of affordable homes
through affordable housing contributions on sites as well as the sale of ‘off the shelf’
properties. 
8. Affordable Housing Policy
The ‘Developer Contributions and Affordable Housing Supplementary Guidance’ (2023) is
linked to Policy 20 in the Perth and Kinross Local Development Plan 2 (2019).  It outlines the
contribution developers must make towards affordable housing to enable planning
applications for new residential developments to be supported. This guidance was updated
in 2023 and requires new housing developments to provide a 25% affordable housing
contribution on applicable sites.  Applicable sites being residential developments, including
conversions, consisting of 5 or more units except where the LDP varies this quota on an
individual site basis, or sites of 20 units or less in the City Centre Zone
The guidance outlines PKC’s sequential approach for affordable housing contribution where
onsite provision is preferred, followed by offsite provision, and then a commuted sum if the
first two are not possible. Housing Strategy works with developers and RSLs early on to
ensure the affordable housing component meets the local housing need.  
9. Prioritisation Framework
All new affordable housing proposals for the SHIP are prioritised using the SHIP Prioritisation
Framework (see appendix 5). This framework assesses proposals based on the Council’s
strategic aims, priorities, and project deliverability.  The Council balances investment
decisions through a mix of Council, RSL and developer delivery, considering various
affordable housing tenures to meet housing need across all the HMAs. 
10. Development Constraints
The SHIP has built in an overprovision of 39% to account for slippage. This ensures that if
developments are delayed, there are ample sites available to spend the grant monies that
are made available via Scottish Government. As noted previously, the RPA for each financial
year needs to be spent within that year and so grant unspent does not roll over to next year
but remains with the Scottish Government, and so development constraints can have
serious effect on the programme. 
The construction sector has faced many challenges in recent years, including the pandemic,
excessive inflation and because of the difficult economic times, there has been a number of
construction companies that have went into liquidation and so those operating currently
need to mitigate risk and this can mean that development progress can be slow. 
The private sector companies that remain continue to face many obstacles that can affect
development, including: 
Page 37 of 144

Page 38

• market volatility in the construction sector, impacting on private sector delivery
timescales. 
• increased energy prices.
• high material prices and shortages.
• shortages of labour
• economic uncertainty
• additional costs associated with developing in rural areas. 
These issues need careful management, however, they also present opportunities for
affordable housing providers.  Off-the-shelf opportunities with private developers are
explored to increase affordable housing supply, as are 100% affordable developments. 
11. Procurement Approaches 
PKC encourages collaborative procurement to deliver programmes effectively.  The Council is
part of the Scotland Excel framework and will also use the HUB framework for procuring
services, where appropriate.  They will also explore offsite and modern construction
methods for new projects to ensure quality and speed.  
12. Equalities
PKC’s Impact and Value Assessment (IVA) process screens and monitors every Council
proposal against statutory and non-statutory environmental, social and economic criteria. It
covers a range of assessment areas including: Strategic and Resource implications, and
impact assessment for Climate Change, Equality & Fairness, Child Rights & Wellbeing,
Sustainable Procurement & Supply, and Strategic Environmental Assessment. 
This screening showed that an Equality & Fairness Impact Assessment was required as there
was likely to be some positive impacts on some protected characteristic groups. A full
assessment was done during the LHS process, which informs the SHIP outcomes, and so this
has been referenced throughout the one done for this SHIP. 
13. Strategic Environment Assessment
The Strategic Environmental Assessment (Scotland) Act 2005 requires plans, programmes,
and strategies to be screened for environmental impact. The SHIP, as part of the LHS, was
pre-screened and found to have no or minimal environmental effects, making it exempt.  
The SEA Gateway has been notified. 
Page 38 of 144

Page 39

Appendix 2
Table 1. SHIP Period Starts / Approvals 
Project Name  HMA RSL General
Needs
Specialist
/
Supported
W/Chair Total
Affordable
Homes
Tenure Pre-Ship
Starts /
Approvals
25/26
SHIP Period Starts / Approvals
26/27 27/28 28/29 29/30 30/31 
Pre-
SHIP
25-26
Buybacks NA PKC 40 0 0 40 SR 40          
Broich Road, Crieff Strathearn KHA 47 0 5 52 SR 52         
Almond Valley Phase 1,
Perth 
Greater
Perth
PfP 64 0 6 70 SR /
MMR
70         
Broich Road, Phase 3 Strathearn KHA 25 0 0 25 MMR 25         
Hatton Road, Rattray S&G HHA 33 0 5 38 Mix 38         
Grewar Farm, Coupar
Angus
S&G PKC 44 0 5 49 SR  49         
Broich Road, Crieff OTS Strathearn PKC 12 0 0 12 SR 12          
Westpark, Blairgowrie OTS S&G PKC 4 0 0 4 SR 4          
East of St Cedd's Road,
Ballinluig
Highland PKC 22 0 3 25 SR 25         
Leslie Court (Conversion) Greater
Perth KHA 8 0 0 8 SR 8           
26/27
Buybacks  NA PKC 40 0 0 40 SR   40        
Stanley H30 (ph1) Greater
Perth
KHA 14 0 2 16 SR   16       
Hawarden Terrace, Perth Greater
Perth 
Ark 0 12 2 12 SR   12        
Former Balhousie School,
Perth  
Greater
Perth  PKC 41 0 4 45 SR   45        
Beechgrove, Perth   Greater
Perth  PKC 37 0 4 41 SR   41        
Oudenarde Site Greater
Perth 
HHA 37 0 4 41 SR    41       
Meadows Bridge of Earn  Greater
Perth
KHA 24 0 3 27 SR   27       
Powmill Kinross-
shire
KHA 7 0 0 7 MMR  7    
Westfields, Rattray S&G PKC/
HHA
93 0 10 103 Mix  46  57  
Colonsay Resource
Centre, Perth
Greater
Perth
PKC 7 0 1 8 SR    8       
7
Page 39 of 144

Page 40

Project Name  HMA RSL General
Needs
Specialist
/
Supported
W/Chair Total
Affordable
Homes
Tenure Pre-Ship
Starts /
Approvals
25/26
SHIP Period Starts / Approvals
26/27 27/28 28/29 29/30 30/31 
27/28
Buybacks NA PKC 40 0 0 40 SR     40      
Scone North S&G PfP 33 0 4 37 SR/
MMR    
37     
Westpark Phase 1,
Blairgowrie
S&G KHA 66 0 7 73 SR/
MMR   
73     
Former Hillside Hospital,
Perth  
Greater
Perth 
PKC/
HHA
65 0 7 72 SR /
MMR    
30 42    
Westpark Phase 2B S&G Ark 0 42 6 42 SR     42     
Duntaylor Avenue,
Aberfeldy
Highland PKC 50 0 5 55 Mix     55     
Captains Glen, Bridge of
Earn
Greater
Perth PKC 81 0 8 89 SR   89   
Kirkmichael S&G CHA 7 0 1 8 SR   8   
28/29
Buybacks NA PKC 40 0 0 40 SR       40    
Borlick Phase 1, Aberfeldy Highland PKC 23 8 4 35 SR       35   
Castlemains,
Auchterarder Strathearn PKC 10 0 2 12 SR    12  
Drummond Arms, Crieff Strathearn PKC 27 0 3 30 SR    30  
Almond Valley Phase 2,
Perth
Greater
Perth
PfP 15 0 0 15 SR    15   
29/30
Buybacks     40 0 0 40 SR         40  
Leisure Centre, Pitlochry Highland PKC 9 0 1 10 SR         10 
Rossie Place Ph 1,
Auchterarder
Strathearn PKC 31 0 4 35 SR          35 
Stanley H30 (ph2) Greater
Perth
PKC 28 0 3 31 SR          31 
Pleasance Road, Coupar
Angus S&G HHA 17 0 2 19 SR     19 
30/31
Buybacks NA PKC 40 0 0 40 SR           40
Moncur Road, Inchture Greater
Perth  HHA 10 0 2 12 MMR           12
Atholl Road/Elm Court,
Pitlochry
Highland PKC 16 0 2 18 SR           18
Visit Scotland Office,
Pitlochry
Highland PKC 2 0 0 2 SR           2
Page 40 of 144

Page 41

Project Name  HMA RSL General
Needs
Specialist
/
Supported
W/Chair Total
Affordable
Homes
Tenure Pre-Ship
Starts /
Approvals
25/26
SHIP Period Starts / Approvals
26/27 27/28 28/29 29/30 30/31
Former Crieff Primary,
Crieff Strathearn PKC  27 0 0 30 SR      30 
Abernethy
Greater
Perth PKC 35 0 4 35 SR      35         
Pre-SHIP  SHIP Period    
1311 62 119 1483  323 283 374 231 135 137 
SHIP Period Starts / Approvals – 231 
Table 2. SHIP Period Completions 
Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
25/26 26/27  27/28  28/29  29/30  30/31
Pre-
SHIP
25/26
Buybacks NA PKC 40 0 0 40 SR 40          
Rattray  Strathmore PKC 8 0 0 8 SR 8          
Bertha Park Phase 3,
Perth
Greater
Perth
KHA 36 0 5 41 SR 41          
Abbeyfield, Crieff Strathearn HHA 1 8 0 9 SR 9          
Wester Tomaknock,
Crieff
Strathearn HHA 23 0 2 25 SR 25          
Dunkeld (off the
shelf)
Highland  PKC 2 0 0 2 SR 2          
Old Causeway,
Kinross 
Kinross HHA 8 0 0 8 SR 8          
Leslie Court
(Conversion)
Greater
Perth
KHA 8 0 0 8 SR 8          
Forfar Road, Miegle  Strathmore KHA 23 0 2 25 SR  25         
Broich Road, Crieff
OTS
Strathearn PKC 12 0 0 12 SR 12     
Page 41 of 144

Page 42

Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
25/26 26/27  27/28  28/29  29/30  30/31
Westpark,
Blairgowrie OTS
S&G PKC 4 0 0 4 SR 4     
26/27
Buybacks  NA PKC 40 0 0 40 SR   40        
St Andrews Street,
Perth
Greater
Perth
HHA 37 0 2 39 SR / MMR   39    
Stanley H31 Greater
Perth
CHA 20 0 2 22 SR   22        
Stanley H30 (ph1) Greater
Perth
KHA 14 0 2 16 SR    16       
Hawarden Terrace,
Perth
Greater
Perth 
Ark 0 12 2 12 SR   12       
Grewar Farm,
Coupar Angus
S&G PKC 44 0 5 49 SR    49      
Powmill Kinross KHA 7 0 0 7 MMR  7    
Broich Road, Crieff Strathearn KHA 47 0 5 52 SR   52        
Broich Road, Phase
3
Strathearn KHA 25 0 0 25 MMR    25      
Colonsay Resource
Centre, Perth
Greater
Perth
PKC 7 0 1 8 SR   8        
27/28
Buybacks NA PKC 40 0 0 40 SR     40      
Oudenarde Site Greater
Perth 
HHA 37 0 4 41 Mix     41      
Hatton Road, Rattray S&G HHA 33 0 5 38 Mix     38     
Almond Valley Phase
1, Perth 
Greater
Perth
PfP 64 0 6 70 SR / MMR     35 35    
Former Balhousie
School, Perth  
Greater
Perth 
PKC 41 0 4 45 SR     45      
Beechgrove, Perth   Greater
Perth 
PKC 37 0 4 41 SR     41      
Westfields, Rattray S&G PKC/
HHA
93 0 10 103 Mix   33 35 35 
Meadows Bridge of
Earn 
Greater
Perth
KHA 24 0 3 27 SR      27     
East of St Cedd's
Road, Ballinluig
Highland CHA 22 0 3 25 SR     25     
Page 42 of 144

Page 43

Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
25/26 26/27  27/28  28/29  29/30  30/31
Kirkmichael S&G CHA 7 0 1 8 SR   8   
28/29
Buybacks NA PKC 40 0 0 40 SR       40    
Scone North S&G PfP 38 0 4 42 Mix       42   
Almond Valley Phase
2, Perth
Greater
Perth
PfP 15 0 0 15 SR    15  
Captains Glen,
Bridge of Earn
Greater
Perth
PKC 81 0 8 89 SR    30 30 29
Former Hillside
Hospital, Perth  
Greater
Perth 
PKC/HHA 65 0 7 72 SR / MMR      32 40  
Westpark Phase 1,
Blairgowrie
S&G PfP 66 0 7 73 Mix        73 
29/30
Buybacks  NA   40 0 0 40 SR         40  
Duntaylor Avenue,
Aberfeldy
Highland HH 50 0 5 55 Mix         55  
Westpark Phase 2B S&G Ark 0 42 6 42 SR        42  
Castlemains,
Auchterarder
Strathearn PKC 10 0 2 12 SR     12 
Drummond Arms,
Crieff
Strathearn PKC 27 0 3 30 SR     30 
Borlick Phase 1,
Aberfeldy
Highland PKC 23 8 4 35 SR         35 
Leisure Centre,
Pitlochry
Highland PKC 9 0 1 10 SR         10  
30/31
Buybacks NA PKC 40 0 0 40 SR           40
Moncur Road,
Inchture
Greater
Perth  HHA 10 0 2 12 MMR           12
Pleasance Road,
Coupar Angus
S&G HHA 17 0 2 19 SR      19
Rossie Place Ph 1,
Auchterarder
Strathearn PKC 31 0 4 35 SR           35
Visit Scotland
Office, Pitlochry
Highland PKC 2 0 0 2 SR          2
Atholl Road/Elm
Court, Pitlochry
Highland PKC 16 0 2 18 SR          18
Page 43 of 144

Page 44

Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
25/26 26/27  27/28  28/29  29/30  30/31
Stanley H30 (ph2) Greater
Perth
PKC 28 0 3 31 SR           31         
Pre-SHIP SHIP Period Completions    
1412 70 128 1602  182 270 333 302 329 186 
SHIP Period Completions – 284 per year
Page 44 of 144

Page 45

Appendix 3
Table 1. SHIP Projects Grant Funding 
Key: Registered Social Landlord (RSL), Kingdom Housing Association (KHA), Ark Housing Association (ARK), Places for People (PfP), Hillcrest
Housing Association (HHA), Perth and Kinross Council (PKC), Caledonia Housing Association (CHA). Social Rent (SR), Shared Equity (SE), Mid-
Market Rent (MMR), Wheelchair adapted (WC)
Site RSL Total SR SE MMR WC  HMA Current SHIP New SHIP Period  Total
25/26 26/27 27/28 28/29 29/30 30/31
PKC Buybacks  PKC 200 200 0 0 0 Various  £1,400,000 £1,400,000 £1,400,000 £1,400,000 £1,400,000 £7,000,000
Stanley H30  KHA 16 16 0 0 2 Greater
Perth 
£1,978,000     £1,978,000
Meadows
Bridge of Earn
KHA 27 27 0 0 3 Greater
Perth 
£2,500,000     £2,500,000
Scone North PfP 37 29 0 8 4 Greater
Perth  
£2,500,000 £1,500,000   £4,000,000
Almond Valley,
Perth Ph1 / Ph2
PfP 85 60 0 25 6 Greater
Perth
£1,700,000 £4,440,000 £786,000 £1,400,000   £6,626,000
Hawarden
Terrace, Perth
Ark 12 12 0 0 2 Greater
Perth 
£1,192,380     £1,192,380
Oudenarde,
Bridge of Earn
HHA 41 41 0 0 4 Greater
Perth 
£1,073,965 £2,000,000    £3,073,965
Moncur Road,
Inchture
HHA 12 0 0 12 2 Greater
Perth     
£750,000 £750,000
Former Hillside
Hospital, Perth
HHA /
PKC
72 57 0 15 7 Greater
Perth  
£3,000,000 £2,000,000 £2,000,000  £7,000,000
St Andrew
Street, Perth
HHA 39 39 0 0 2 Greater
Perth
£2,000,000 £995,000     £995,000
Captains Glen,
Bridge of Earn
PKC 89 89 0 0 8 Greater
Perth  
£3,890,000 £3,300,000 £3,366,554  £10,556,554
Former
Balhousie
School, Perth  
PKC 45 45 0 0 0 Greater
Perth 
£2,000,000 £2,418,000    £4,418,000
Beechgrove,
Perth  
PKC 41 41 0 0 5 Greater
Perth 
£3,700,000     £3,700,000
Colonsay
resource
Centre
PKC 8 8 0 0 1 Greater
Perth 
£668,384     £668,384
Stanley H30
(ph2)
PKC 31 31 0 0 3 Greater
Perth    
£2,800,000  £2,800,000
7
Page 45 of 144

Page 46

Site RSL Total SR SE MMR WC  HMA Current SHIP New SHIP Period  Total
25/26 26/27 27/28 28/29 29/30 30/31
Abernethy PKC 35 35 0 0 4 Greater
Perth     
£1,000,000 £1,000,000
Duntaylor
Avenue,
Aberfeldy 
PKC 55 55 0 0 6 Highland    £2,343,000 £4,000,000   £6,343,000
Leisure Centre,
Pitlochry
PKC 10 10 0 0 1 Highland      £835,480  £835,480
Visit Scotland
Office,
Pitlochry
PKC 2 2 0 0 0 Highland      £167,096 £167,096
Atholl Road
/Elm Court,
Pitlochry
PKC 18 18 0 0 2 Highland       £1,500,000 £1,500,000
Borlick Phase
1, Aberfeldy
PKC 35 35 0 0 4 Highland     £3,500,000   £3,500,000
East of St
Cedd's Road,
Ballinluig
PKC 25 25 0 0 3 Highland  £1,000,000 £2,300,000     £2,300,000
Powmill KHA 7 7 0 0 0 Kinross-
shire 
£570,000     £570,000
Broich Road,
Crieff
KHA 52 52 0 0 5 Strathearn £,4,500,000 £1,700,000     £1,700,000
Rossie Place
(Ph 1),
Auchterarder
PKC 35 35 0 0 4 Strathearn     £3,350,000  £3,350,000
Castelmains,
Auchterarder
PKC 12 12 0 0 2 Strathearn    £1,110,000   £1,110,000
Drummond
Arms, Crieff
PKC 30 30 0 0 0 Strathearn    £2,700,000   £2,700,000
Former Crieff
Primary
School, Crieff
PKC 30 30 0 0 3 Strathearn      £2,700,000 £2,700,000
Westpark
Phase 1,
Blairgowrie
KHA 73 34 0 39 4 Strathmore   £3,000,000 £3,000,000 £2,205,214  £8,205,214
Westpark
Phase 2B,
Blairgowrie
Ark 42 42 0 0 6 Strathmore    £2,000,000 £1,800,000  £3,800,000
Page 46 of 144

Page 47

Site RSL Total SR SE MMR WC  HMA Current SHIP New SHIP Period  Total
25/26 26/27 27/28 28/29 29/30 30/31
Hatton Road,
Rattray
HHA 38 38 0 0 3 Strathmore £1,073,000 £1,800,000 £1,673,000    £3,473,000
Pleasance
Road, Coupar
Angus
HHA 19 19 0 0 2 Strathmore     £2,300,000  £2,300,000
Westfields,
Rattray 
HHA /
PKC
103 62 16 25 10 Strathmore  £2,000,000 £2,200,000 £1,500,000 £3,000,000  £8,700,000
Grewars Farm,
Coupar Angus
PKC 42 42 0 0 4 Strathmore £1,000,000 £2,000,000 £1,500,000    £3,500,000
Kirkmichael  CHA 8 8 0 0 0 Strathmore   £850,000    £850,000               
Total   1426 1286 16 124 112   £30,317,729 £27,560,000 £27,410,000 £23,057,248 £7,517,096 £115,862,073
RPA         £16,634,000 £16,634,000 £16,634,000 £16,634,000 £16,634,000 £83,170,000
RPA plus
slippage (39%)        
£23,121,260 £23,121,260 £23,121,260 £23,121,260 £23,121,260 £115,606,300               
Table 2. 
SHIP Projects being grant funded by HMA (does not include buybacks)
Greater Perth Highland Kinross Strathearn Strathmore
590 145 7 159 325 
Table 3. 
SHIP Projects being funded by RSL (does not include buybacks)
Perth and Kinross Council Kingdom Housing Association Places for People Hillcrest Housing Association  Ark Housing Association  Caledonia Housing Association 
619 175 122 248 54 8 
Page 47 of 144

Page 48

Page 48 of 144

Page 49

Appendix 4
Private Sector Empty Homes Returns
The tables below relate to private properties brought back into use with help from
PKC Empty Homes Service. These have been taken directly from the yearly returns
local authorities need to submit to the Empty Homes Partnership, which is operated
by Shelter Scotland on behalf of the Scottish Government. The varying format they
are presented in is due to the manner in which the information has been supplied in
the respective years. Scottish Government guidance on drafting the SHIP requires
us to provide this information within the SHIP. 
2024/25 Empty Homes Returns 
No. of properties  Length of time empty 
4 Less than a year
15 1-2 years 
28 2-5 years 
11 5-10 years
7 10+ years 
28 Unknown 
No. of properties Route back into use
13 Let at an affordable rent 
40 Owner occupier
30 Let privately 
10 Unknown 
2023/24 Empty Homes Returns
No. of properties Length of time empty 
3 Less than a year
11 1-2 years 
21 2-5 years 
3 5-10 years
14 10+ years 
28 Unknown 
No. of properties Route back into use
10 Let through private sector leasing scheme
10 Let at an affordable rent 
25 Owner occupier
30 Let privately 
5 Sold through estate agent 
2022/23 Empty Homes Returns
No. of properties Length of time empty 
8 Less than a year
26 1-2 years 
7
Page 49 of 144

Page 50

8 2-5 years 
10 5-10 years
4 10+ years 
8 Unknown 
Page 50 of 144

Page 51

Appendix 5
Prioritisation Framework
Introduction 
Our Prioritisation Framework provides a tool to prioritise investment, it balances the
Scottish Government’s ambitions contained in Housing to 2040, and Perth and
Kinross Council’s Local Housing Strategy (LHS) outcomes. 
Partner Housing Associations that operate in the area have been asked to submit
proposals, in an agreed format, for any sites that are not currently in the SHIP that
they wish to be considered for funding. 
The framework does not provide the only assessment of priority and the Council will
continue to balance its investment decisions to ensure housing need across the
Housing Market Areas is met, and that there is an appropriate split between
rural/urban and greenfield/brownfield delivery, as per LHS outcomes. 
As achieving strategic objectives is crucial, it is essential that we ensure only those
projects that can be delivered are included. For this reason, the framework operates
a 2-step process, whereby a pre-screening exercise is undertaken initially, before
proposals are then scored against our matrix. 
Pre-Screening 
Any sites proposed that are outwith development boundaries, as per LDP, will
automatically be screened out unless they have planning consent, either outline, or
detailed, or can be justified through NPF4. Any allocated housing sites in LDP will
automatically be progressed to site scoring. 
All other sites will be considered as part of the pre-screening process, whereby a
review of the site will be considered by Perth and Kinross Council’s Housing Strategy
Team. This review will include a check on the sites planning history, potential site
constraints, and may include discussions with Planning about the proposal. These
sites will then be reviewed against the detail and scale of the project. 
There are 3 potential outcomes of pre-screening: 
1 Progress to site scoring.
2 Refusal to score until planning consent given.
3 Agree to score though only on a reduced number of units. 
Agreement to proceed to site scoring is not an assurance that the site will ultimately
be delivered as per the proposal, only that initial checks have been carried out to
ensure that the Council have satisfied itself, based on current knowledge that there
are no obvious impediments to its delivery. 
Proposals that do not provide a contribution to the LHS target to deliver 10% of new
supply affordable housing that is wheelchair or adaptable standard, will be screened
out, unless there are exceptional circumstances related to the site that make this
prohibitive, and/or through agreement with Housing Strategy. This standard includes
7
Page 51 of 144

Page 52

both Wheelchair User and Older / Ambulant Disabled User standard contained in
Housing for Varying Needs document. 
Site Scoring 
To ensure fairness and transparency, each proposal, unless screened out, will be
scored against set criteria listed below. As noted above, whilst this is the basis for
investment decisions, it cannot be the only tool that is used, as the sites selected for
inclusion need to assist in achieving the LHS outcomes, and so this needs to be
considered alongside site scoring. 
Priority 1 considers whether the proposal meets housing need.  This will be
assessed using different data sets, including applicant wating lists, scale of existing
stock and current turnover, Housing Need and Demand Assessment (HNDA), and
future supply. 
Priority 2 considers whether the proposal reflects a ‘brownfield first’ approach and
helps bring back into use sites that would benefit the community.
Priority 3 considers where the sites are on their development journey, prioritising
those that are more progressed.
Priority 4 considers whether the proposal will provide fully wheelchair adapted
properties
Priority 5 considers whether project can be cross funded and bring in alternative
funding streams. 
Priority 6 considers how deliverable the proposals are. This is to ensure that priority
is not given to sites that are unlikely to be brought forward. 
Priority 7 considers whether the proposal meets wider strategic priorities. Examples
include provision of supported housing, regeneration projects, substantial over
provision of wheelchair or adapted housing, achieving other LHS outcomes. 
Some elements of scoring will be a matter of fact, some will be down to professional
judgment. 
Scoring Criteria
1. Meets Housing Need 
• High (3)
• Medium (2)
• Low (1) 
2. Site attributes
• Listed Building (1)
• Vacant and Derelict Land Register (1)
• Long term empty building (1)
• Brownfield (1)
• Buildings at Risk (1) 
Page 52 of 144

Page 53

3. Development status 
• Detailed planning consent (2)
• Planning in principle (1)
• Land acquired (1)
• Allocated LDP housing site (1) 
4. Includes fully wheelchair adapted housing 
• 10% delivery (3) 
• 5% delivery (2)
• Less than 5% (1) 
5. Can harness other funding streams e.g Rural Housing Fund (2) 
6. Deliverability 
• High (3)
• Medium (2)
• Low (1) 
7. Meets Wider Strategic Priorities (3)
Low (1-4) Medium (5-9) High (10+) 
Page 53 of 144

Page 54

Page 54 of 144

Page 55

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Housing and Social Wellbeing Committee 
Date of Meeting: 1 October 2025 
Report Title: Culture Strategy 2023-2028 Mid-Term Review 
Report Number: 25/245 
Report Authors: Julie Barnsley, Economic Development Officer
Kirsty Easton, Team Leader Business, Place &
Investment 
Organisational Lead: Serge Merone, 
Strategic Lead - Economy, Development & Planning
__________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to provide an update on progress made to date
on the delivery of the actions contained within the Culture Strategy 2023-2028
(Appendix 1); and to seek Committee approval for the progression of the
Strategy and actions for the next 3 years. 
1.2 Sections 
1. Purpose
2. Recommendation(s)
3. Background and Context
4. Proposals
5. Conclusion
6. Impact Value Assessment
7. Appendices 
2. Recommendations 
2.1 It is recommended that the Committee notes the progress of the actions to
date. 
2.2  It is recommended that Committee approves the revised action plan detailed
in Appendix 2 including the 3 new actions driven by Perth’s designation as a
UNESCO City of Craft and Folk Art. 
2.3 It is recommended that Committee approves the revised reporting structure.
8
Page 55 of 144

Page 56

2.4 It is recommended that Strategic Lead (Economy, Development and
Planning) brings back annual progress reports to this Committee. 
3. Background and Context 
3.1 The Culture Strategy 2023-2028 aligns with Perth and Kinross Council’s
Corporate Plan vision for a Perth and Kinross where everyone can live life
well, free from poverty and inequality.   
3.2 The creation of the Culture Strategy was led by Cultural and Community
Services and was informed by the findings of the Cultural Task Force – a
partnership convened by the Council in late 2020 / early 2021 in response to
the Covid pandemic. The following consultations informed the content of the
Culture Strategy: 
(i) Stakeholder and public consultations (August to October 2022).
(ii) Elected members (through the Leaders’ discussions) (November 2022).
(iii) Engagement with Creative Scotland and Museums Galleries Scotland
(October 2022). 
3.3 The Culture Strategy was submitted to Full Council by the Head of Cultural
and Community Services in May 2023 when it was approved.  It comprises 9
pledges, each with its own set of actions (Appendix 1). 
3.4 Since the approval, progress has continued despite the significant capacity
required for the delivery of Perth Museum and the need to accommodate
some structural changes. Culture is now situated within Economy,
Development and Planning, providing a stronger platform for both the Culture
workstream and the Culture Strategy. This alignment enhances opportunities
to connect cultural initiatives with the economic potential of the creative
industries. 
3.5 Perth and Kinross’s cultural profile and reputation are growing.  This has been
supported by the Council’s significant investment in cultural capital projects,
including Perth Creative Exchange, Perth Museum, Perth Theatre, St Paul’s
Church, and the City Centre Lighting Strategy. 
3.6 Perth and Kinross’s cultural profile is strengthened by its designation in 2021
as the UK’s first and only UNESCO City of Craft and Folk Art. This prestigious
recognition presents a unique opportunity to further enhance the area's
reputation as a cultural destination and a hub for makers, creatives, and
visitors. To capitalise on this, a dedicated UNESCO Programme Officer post
has been established to lead the development and delivery of a high-impact
programme of activities, ensuring the full potential of the designation is
realised across Perth and Kinross.  
Page 56 of 144

Page 57

3.7 A Cultural Forum was established in 2022 to lead the development of the
pledges which form the Culture Strategy. It is open to culture and heritage
organisations, chaired by the Chief Executive of Culture Perth and Kinross
and is supported by PKC Officers. Members of the Forum lead on many of the
actions contained in the action plan. The Cultural Forum continues to provide
opportunities for information sharing and programming discussion, and to
support the delivery of the Culture Strategy. 
4. Proposals 
4.1 The Culture Strategy consists of 9 cultural pledges with a combined total of 56
actions. Progress to date can be found in Appendix 2. 
4.2 Officers will continue to engage with the lead partner for each action to
monitor progress and agree next steps and the action plan will be updated
accordingly. 
4.3 It is proposed that 3 new actions, which focus on Perth’s designation as a
UNESCO City of Craft and Folk Art, are added into the Culture Strategy action
plan and delivered over the remaining term of the Strategy: 
Pledge 2 
We will ensure culture and heritage are integral to Placemaking
decisions
Proposed
new action
(2.4)
Utilising our unique UNESCO City of Craft and Folk Art
Designation as a driver to share culture and celebrate
creativity within our public realm and underutilised spaces
(including vacant shop units and city signage)
Lead Perth UNESCO City of Craft and Folk Art, CPK, PKC
Resources  Existing staff resource and external funding where available
Success
measures
• Number of public realm interventions and development
of a creative pilot project situated in a vacant shop unit.
• Raising awareness of our UNESCO city of Craft and
Folk Art designation through city centre signage
Deadline March 2028 
Pledge 6 
We pledge to use data and evidence collaboratively to shape
programmes which are well tailored to audiences and increase
participation by growing new audiences. 
Proposed
new action
(6.5)
Be actively engaged in UNESCO's MONDIACULT activity to
share data, cultural policy, and climate change mitigation
within our cultural sector
Lead Perth UNESCO City of Craft and Folk Art, CPK, PKC
Resources  Existing staff resource and external funding where available
Success
measures
Perth is able to benefit from the participatory process of
collecting global cultural policies and sustainable
Page 57 of 144

Page 58

development, and take learnings from international
examples and proven successful models
Deadline March 2028 with the view of looking forward for the
redevelopment of the UN Sustainable Development Goals
for 2030 and the objective of the integration of culture as a
stand-alone goal in the post-2030 development agenda
(aligning with the Braga Manifesto) 
Pledge 9
We pledge to support and develop our small creative and craft
businesses 
Proposed
new action
(9.7)
Focus the programming of the UNESCO City of Craft and
Folk Art designation on raising the profile, creating
opportunities, and building relationships with local creative
and craft businesses.
Lead Perth UNESCO City of Craft and Folk Art, CPK, PKC
Resources  Existing staff resource and external funding where available
Success
measures
Number of small creative and craft businesses engaged in
new projects
Deadline March 2028 
4.4 The governance and reporting structure was agreed as part of the Strategy in
May 2023 as follows: 
1 Annual reports though the Council’s Annual Performance Report and
Communities Directorate Business Management and Improvement
Plan.
2 An annual update to the Community Planning Partnership and Joint
Board for Health and Social Care on contribution to the 2022-2023
Local Outcomes Improvement Plan.
3 An annual Thematic Review by the Council’s Scrutiny and
Performance Committee. 
4.5 To align with the Council’s current committees and their respective
responsibilities, it is proposed that the reporting structure be amended to the
following: 
1 Annual reports though the Council’s Annual Performance Report 
2 Annual reports to the Housing and Social Wellbeing Committee 
4.6 The Cultural Forum provides an additional channel though which the Strategy
can be monitored and supported.   
Page 58 of 144

Page 59

5. Conclusion 
5.1 There has been good progress made on the Culture Strategy by the many
partners involved, as documented in Appendix 2. The opportunities to attract
future investment and to grow Perth and Kinross’s reputation as a place for
culture and heritage is significant, and by focusing our collective efforts on
delivering the most impactful actions as proposed, the Culture Strategy can
make a real contribution to realising these ambitions and contributing to the
delivery of our Corporate Priorities. 
6. Impact Value Assessment 
6.1 This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment 
7. Appendices 
7.1 Appendix 1 – Cultural Strategy 2023-2028 
7.2 Appendix 2 – Culture Strategy - Pledges and Actions Update 
Page 59 of 144

Page 60

Page 60 of 144

Page 61

Perth and Kinross 
Culture Strategy 2023-2028
A Perth and Kinross where everyone can live life well,
free from poverty and inequalities
8
Page 61 of 144

Page 62

Perth and Kinross Council | Cultural Strategy 2023-20282 Perth and Kinross Council | Cultural Strategy 2023-2028 3
Contents
Perth and Kinross Culture Strategy 2023-2028
1 Foreword
2 Our Story of Place
Our Cultural Context
Our Places and People
3 Strategic Context
National and Corporate Strategic Links
Key Facts
Council Investment
The Digital Revolution
4 Our Vision, Cultural Pledges and Action Plan
5 Strategic Enablers
Customers and Audiences
Resources
6 Monitoring and Governance
Cultural Forum
Picture Credits
Cover image by Cat Gordon
Inside images, with thanks to Culture Perth and Kinross,
Innerpeffray Library, Perth Theatre and Concert Hall, The Scottish
Crannog Centre, Strathearn Arts.
Page 62 of 144

Page 63

Perth and Kinross Council | Cultural Strategy 2023-2028 5
These stories tell us – and the world – who we are. Culture is about
self-expression and opens doorways to knowledge, new ideas
and life chances. Culture engenders joy and pride in our sense of
identity, our differences and our sense of belonging. It supports
learning and skills, employability, physical and mental wellbeing,
instils confidence and resilience. Our culture, in all its diversity,
makes our communities vibrant and resilient. We want everyone in
Perth and Kinross to have an equal chance to take part in culture
and to shape our creative stories for tomorrow.
Foreword1
Culture is at the heart of
every community in Perth
and Kinross. Culture is part
of the story told by every
town, village and settlement
and by our city of Perth,
Scotland’s first capital.
Perth and Kinross Council | Cultural Strategy 2023-20284
Page 63 of 144

Page 64

Perth and Kinross Council | Cultural Strategy 2023-2028 7
Our vision for this Strategy:
We will enable creative communities and
outstanding creative work to thrive in
Perth and Kinross, through partnership.
We have an ambition to be world class as part of the wider Tay
Cities Deal strategy to grow cultural tourism from the Highlands of
Perthshire to Dundee, Angus and North Fife.
Our cultural profile and reputation are growing through major
investment and projects including the new Perth Museum, opening
in 2024 as the home of the Stone of Destiny, also known as the
Stone of Scone, one of the UK and Scotland’s most important
cultural objects, and free to see for the first time.
We also face challenges which we must address to achieve this
vision. Even before the COVID-19 pandemic, traditional High
Streets were declining and we must find new ways to bring people
back into our city and our towns, making them inclusive, exciting
places for shared cultural experiences. Our rural communities have
their own distinct cultural lives and voices, and we must support
their vibrancy alongside our investment in Perth as the main
economic hub of our area. Alongside, the Council faces budget
pressures and the cost of living is impacting on the day-to-day
choices for families and individuals. We want everyone in Perth and
Kinross to have continued opportunity and encouragement to be
creative and to participative in culture. If we are all agreed culture
matters, for our present and our future, we must be open to doing
things differently.   
This includes partners working together closely, sharing limited
resources, and overcoming silos and organisational boundaries. 
It also means making the most of our cultural venues and wider
spaces and as a Council we have invested around £53M in cultural
infrastructure over the last decade and supported our partners
to lever in a further £3M+ in the last 12 months. We revenue-fund
culture to a level of around £4.5M each year, with more money
routed through various Council grant schemes. 
This Strategy links to our overarching corporate aim to make Perth
and Kinross the best place in Scotland to live life well, free from
poverty and inequality. Beyond that there is a national aspiration
for Scotland to be a nation where everyone’s creativity is supported
and celebrated. This Strategy is also intended to help partners and
stakeholders with their own planning and delivery, services, and
opportunities through a clearly defined set of strategic priorities,
and a robust and measurable action plan.
We would like to thank members of the public, key partners and
stakeholders who have helped us develop this Strategy and the
Year 1 Action Plan which accompanies it.
Councillor Grant Laing, Leader, Perth and Kinross Council
Thomas Glen, Chief Executive, Perth and Kinross Council
Foreword
Perth and Kinross Council | Cultural Strategy 2023-20286
Page 64 of 144

Page 65

Perth and Kinross Council | Cultural Strategy 2023-2028 9
Culture is about
self-expression
and opens
doorways to
knowledge, new
ideas and life
chances.
Historically and culturally Perth and Kinross is the beating heart of
Scotland, set in some of the most beautiful countryside in the world
and linked by the Rivers Tay, Earn, Almond, Garry, and Isla. Ancient
drove roads and the Wade Roads, built after the Jacobite Risings
of the early 18th century, criss-cross the land, which is also rich in
over 800 Scheduled Ancient Monuments and archaeological sites.
The area spanning Forteviot, to the east of Perth, was known as the
‘Cradle of Scotland’ – the place where the Picts, Gaels and Scots
came together in the time after the Romans left, to create the
Kingdom of Alba.
Geographically Perth and Kinross is the fourth largest local
authority area in Scotland. Our total population of 151,000 is
scattered across an area of over 2,000 square miles, a mix of urban
and rural spaces. This brings challenges of how to support and
foster creativity in the rural areas, where over two thirds of people
live, while still developing Perth city centre as an economic hub
for the wellbeing of Perth and Kinross as a whole. The COVID-19
pandemic highlighted some of these challenges, but also brought
new ways of making and accessing culture too.
Perth and Kinross Council has been the local authority since 1996.
In 2012, Perth regained City Status and was Scotland’s seventh city.
Perth College is part of the University of the Highlands and Islands
(UHI), with 650 culture and creative industry students.
Our Story of Place2
Perth and Kinross has a multicultural population including Gypsy
Traveller, Polish and Chinese communities with long-established
roots in the area, and newer communities who have settled in the
area over the past decade.
More than 70% of the Scottish population can be in Perth within 90
minutes, including from Dundee, Edinburgh, Stirling and Glasgow.
Perth and Kinross is home to
around 150,000 people.
Perth and Kinross has an
older population than
Scotland as a whole. The
number of people aged 65+
has increased significantly.
97.9% of Perth and Kinross
identified as of white
ethnicity, 1.3% of Asian
ethnicity and 0.8% as other
ethnic group.
Many people in Perth and
Kinross manage well but over
a third of households (36%)
are financially stretched
or facing considerable
economic challenges.
6.2% of the Perth and
Kinross population live in
the most deprived quintile.
The majority of whom live in
north/central Perth and in
Rattray.
Two thirds of the population
of Perth and Kinross live in
rural areas or small towns
outside Perth.
Perth and Kinross Council | Cultural Strategy 2023-20288
Page 65 of 144

Page 66

Perth and Kinross Council | Cultural Strategy 2023-202810 Perth and Kinross Council | Cultural Strategy 2023-2028 11
Our Cultural Context
Our mix of nationally recognised creative organisations who create
innovative and exciting new work for and about the people of
Perth and Kinross whilst bringing global artists and creative work
to our doorstep makes us special. This national and internationally
significant work interlinks with our homegrown talent: some of
Scotland’s most significant artists, makers, writers, musicians, poets,
and actors live and work here. Our museum collections speak of
people who went before us, who lived and worked this land. Our
pubs and villages halls which echo with our traditional music,
stories, and song. The words that explain lives past, present and
future.
We are rich in distinct festivals that celebrate our talent, from
the Neil Gow Festival in Birnam, the Soutar Scots Language and
Literature Festival, Perth Festival of the Arts and Blairgowrie’s
Bookmark Festival – all celebrating some of our greatest cultural
figures while allowing new voices to be heard.
Our communities have always been rich and diverse and this has
strengthened in recent years as people from all over the world have
made their home in Perth and Kinross, bringing cultural traditions
and creativity. Our Gypsy Traveller communities have roots here,
dating back centuries. This diversity and cultural distinctiveness,
Our Places and People
Perth City
With a population of just under 50,000, Perth City is the main
urban centre in Perth and Kinross. Small, walkable, with beautiful
parks and the magnificent River Tay running through it, it has both
extraordinary heritage as Scotland’s first capital and a burgeoning
contemporary arts scene. Perth Concert Hall, Perth Theatre, Perth
Art Gallery and the new Perth Museum plus the AK Bell Library,
Scotland’s fourth busiest public library.
The Council’s investment in light installations has brought to life the
historic medieval vennels of Perth with new work by Nathan Coley
and other Scottish/international artists across the city.
The new Creative Exchange WASPS hub, opened in 2019, is home
to makers and creatives who sell their products through the
independent shops which flourish in the city, even if bigger chain
stores have gone to the outskirts.
The University of Highlands and Islands/Perth College has
curriculum specialisms in music technology and other creative
subjects. Culture Perth and Kinross, and Perth Theatre and Concert
Hall, the independent charities which operate the theatre, concert
hall, museums and libraries offer programmes across all art forms
and creative learning opportunities for all ages. Other independent
of all our communities and our organisations, is central to this
Strategy.
Within the area we have two major producing theatres, several
museums of UK and national significance including Perth Museum
opening in Spring 2024, the Scottish Crannog Centre and the Black
Watch Museum. Our cultural venues are mostly run by charities and
community-led organisations, many of which are revenue or grant-
funded by the Council.
Perth and Kinross Council works closely with neighbouring cities,
including through the Tay Cities Deal, a £150M agreement
between the UK and Scottish Governments to make the region
smarter and fairer through investment in innovation, international
links, and cultural tourism.
organisations including Ad-Lib Arts and the Julie Young Dance
School are also based in Perth and provide training for local
children and young people in the performing arts.
• Perth City has an area of approximately 28 square kilometres.
• The latest data estimates the population of 46,184.
• Between 2015 and 2020, the population has decreased by
2%.
• There are a notably lower proportion of people aged 5 to 19
years and 45 years plus, and a higher proportion of young
adults when compared to Perth and Kinross.
Our Story of Place2
2%
Population
growthArea size
46,184
Population
5-19 & 45+ yrs 
20+ yrs
Age comparison to
Perth and Kinross
28 km2
Page 66 of 144

Page 67

Perth and Kinross Council | Cultural Strategy 2023-2028 13Perth and Kinross Council | Cultural Strategy 2023-202812
Eastern Perthshire
From the northern banks of the River Tay towards the mountains,
Eastern Perthshire is a rural area with three towns – Blairgowrie,
which has the largest population centre after Perth, Coupar
Angus, and Alyth. It covers Strathmore, the Carse of Gowrie and
Blairgowrie and the Glens – a large and diverse geography which
is home to 38,900 people. It also has some key socio-economic
challenges, driven in part by low wages from agriculture and
tourism. Physical and mental wellbeing, and reducing social
isolation, are important priorities for many communities in the area.
It is a place of traditional storytelling, of poetry and song, of walks
and outdoor living. Blairgowrie was the birthplace of Hamish
Henderson, Scottish poet, songwriter, soldier and, known as the
founding father of Scotland’s 20th century folk renaissance. This is
an area rich in farming, which is an inspiration and resource for the
social history museum collection in Alyth. The Nest in Blairgowrie
is a hive of creative activity, firmly focused on the community that
surrounds it. The Bookmark Festival is a cultural success story.
Highland Perthshire
Visiting Highland Perthshire or ‘Big Tree Country’ with its mountains,
glens, huge lochs and historic towns and villages, Aberfeldy and the
Victorian resort town of Pitlochry, it’s easy to see why it’s a home to
musicians, makers and creatives of all kinds.
The two bigger towns, Pitlochry and Aberfeldy, respectively boast
the major producing theatre, Pitlochry Festival Theatre, and The
Birks Cinema. The Birks is a community-owned facility which hosts
music, spoken word and film festivals which attract visitors to the
area as well as catering to local people. The Scottish Crannog
Centre at Kenmore is expanding its site through a Community Asset
Transfer and Scottish Government grant to tell the story of the Iron
Age people who lived on the waters of Loch Tay.
Highland Perthshire witnessed some of the most turbulent and
important events in Scottish history with the stunning vista of
Schiehallion, the Queen’s View at Loch Tummel, the hydro-electric
dams built in the early 20th century and the traces of the 19th
century Highland Clearances all part of its landscapes and stories.
Perthshire Gaelic was the majority language in the Highlands (and
also in Perth) until the late medieval period and native Gaelic
speakers continued to live in the Highlands until very recently.
• Eastern Perthshire is approximately 96 square kilometres.
• Eastern Perthshire is one of the fastest growing areas in
Scotland in terms of population with a population of 38,900.
• From 2001-2011, the population increased by 9%.
• The locality has fewer 0-19-year-olds and more people aged
65 and over compared to other localities within Perth and
Kinross.
• The Highland Ward covers an area of just under 224 square
kilometres.
• The latest data available estimates the population of the
Ward as 9,217.
• The Ward has an older population compared to Perth and
Kinross.
• Between 2015 and 2020, the population has declined by 2%. 
4%
Population
growth
96 km2
Area size
38,900
Population
0-19 yrs 
65+ yrs
Age comparison to
Perth and Kinross
2%
Population
growth
224 km2
Area size
9,217
Population
older
Age comparison to
Perth and Kinross
Our Story of Place2
Page 67 of 144

Page 68

Perth and Kinross Council | Cultural Strategy 2023-2028 15Perth and Kinross Council | Cultural Strategy 2023-202814
Almond and Earn
Almond and Earn covers 32 square kilometres and has a population
of about 10,000 people living in many villages. There are no major
towns although parts of the area are close to Perth; culture thrives
in local clubs, village halls and groups created and run by local
people including a cinema club. The largest village is Abernethy
with 1,400 residents. There is an independently-run museum where
you can climb to the top of one of Scotland’s most unusual historic
sites: Abernethy Round Tower dating from 1100 is one of only two
Irish-style round towers in Scotland.
• The Strathtay Ward covers an area of approximately 71 square
kilometres.
• The latest data available estimates the population of the
Ward as 12,841.
• The Ward has a notably greater percentage of people aged
15-19 years compared to Perth and Kinross.
• Between 2015 and 2020, the population has grown by 3%.
• The Almond and Earn Ward covers an area of approximately
32 square kilometres.
• The latest data available estimates the population of the
Ward is 9,495.
•  The Ward has a greater percentage of young people aged
under 24 years and a lower percentage of people aged 60+
years compared to Perth and Kinross as a whole.
• Between 2015 and 2020, the population with the Ward has
grown by 6%.
Strathtay
In the centre of Perth and Kinross lies Strathtay, a rural area of 71
square kilometres with two bustling towns of Birnam and Dunkeld.
Surrounded by stunning scenery, with the Tay at its heart, it’s no
surprise that live traditional music is still a key part of community
life.
Birnam Arts Centre, also community-owned and managed, hosts
a café, shop, gallery, and auditorium that hosts a range of events
throughout the year. There are several unique homegrown festivals,
including the Neil Gow Festival which celebrates the famous fiddler
who set many of Burns’ songs and poems to music.
The population of 13,000 has a greater percentage of people aged
15-19 years than the average in Perth and Kinross, and access to
culture for this age group needs to be strengthened.
3%
Population
growth
71 km2
Area size
12,841
Population
15-19 yrs
Age comparison to
Perth and Kinross
6%
Population
growth
32 km2
Area size
9,495
Population
-24 yrs 
60+ yrs
Age comparison to
Perth and Kinross
Our Story of Place2
Page 68 of 144

Page 69

Perth and Kinross Council | Cultural Strategy 2023-2028 17Perth and Kinross Council | Cultural Strategy 2023-202816
Strathearn and Strathallan
Strathearn and Strathallan are located to the south-west of Perth
with a population of 29,873. Crieff and Auchterarder are the
biggest towns, surrounded by stunning mountains, lochs, and rivers.
The Gleneagles Hotel, opened in 1924, and other major attractions
including Crieff Hydro and Drummond Castle Gardens mean the
area contributes 23% of tourism revenue to Perth and Kinross.
Innerpeffray Library just outside Crieff is the oldest public lending
library in the UK and its important special collections can still be
studied and viewed there.
The area has many active arts organisations including Strathearn
Arts which is a major provider of culture in the area, a radio station
(Radio Earn), regular concerts all year round and many local culture
and heritage groups and classes. The area is also home to many
small creative businesses who are attracted by the space available
and opportunities to sell at the many craft shops and markets.
• Strathearn and Strathallan covers an area of 78 square
kilometres.
• The latest data available estimates the population as 22,866.
• The Ward has a younger age profile when compared to Perth
and Kinross.
• Between 2015 and 2020, the population has grown by 9%.
Kinross-shire
Straddling Fife and Perthshire is Kinross-shire, with a wealth of
beautiful scenery and walks including Loch Leven where you can
see rare birds or spot the castle where Mary Queen of Scots was
held captive, inspiring Sir Walter Scott and others. The population
of about 15,000 people (5,000 of whom live in Kinross) is set to
grow in the next few years as house-building increases in the area.
Kinross-shire is fiercely proud of its distinct cultural activities
including the music played in local pubs and hotels and by young
people, the orchestras and choirs that meet and engender a real
sense of community.
• The Kinross-shire Ward has an area of approximately 
26 square kilometres.
• The latest data available estimates the population of the
Ward as 14,630.
• The Ward comprises 10% of the total Perth and Kinross
population (151,910).
•  The Ward has a notably lower proportion of those aged 
20-39 years and a notably higher proportion aged 
45-64 years compared to Perth and Kinross.
• Between 2015 and 2020, the population within the Ward
has grown by 8%. Over the same time period the overall
population of Perth and Kinross has increased by 7%.
11%
Population
growth
78 km2
Area size
22,866
Population
55+ years
Age comparison to
Perth and Kinross
8%
Population
growth
26 km2
Area size
14,630
Population
20-39 yrs 
45-64 yrs
Age comparison to
Perth and Kinross
Our Story of Place2
Page 69 of 144

Page 70

Perth and Kinross Council | Cultural Strategy 2023-2028 19
National and Corporate
Strategic Links
Nationally, Scotland recognises the importance of culture for
prosperity and wider wellbeing. The National Culture Strategy sets
three ambitions: strengthening culture by enabling it to flourish;
transforming the nation’s social, economic and environmental
prosperity through culture; and empowering through culture, by
putting communities at the heart of making culture. The latter
ambition is echoed in the National Heritage Strategy, Our Place In
Time, which aims to put communities at the heart of how heritage
is managed, accessed and interpreted. We have also read and
acknowledge the local Community Action Plans.
This Strategy for Perth and Kinross aligns with these ambitions and
our own corporate aim to make our area the best place in Scotland
for everyone to live life well, free from poverty and inequality.
Culture can and should contribute to each of our corporate
priorities:
• Tackling Poverty: we will set targets to reduce barriers to
participation in culture, particularly considering the cost-of-
living crisis.
• Tackling Climate Change: as a UNESCO Creative City for Craft
and Folk Art, we must adhere to the UN Sustainability Goals. 
We will raise awareness of these important principles amongst
all our creative organisations, businesses, and artists/makers.
The Strategic Context
We will also work to ensure our cultural venues meet the 2030
Just Transitions target to reduce carbon emissions by 70%.
• Growing a sustainable and inclusive local economy: we
will support and develop our small creative businesses and
industries and grow their contribution to our wider economy.
Our thriving craft sector helped secure UNESCO City Status
and we need to build its capacity and economic contribution
to the area.
• Enabling our children and young people to achieve their full
potential: the next generation of artists, makers, curators,
actors, musicians and more are essential for the future cultural
life of our area. We will create learning, skills and employability
opportunities for local young people to work in our creative
sectors, with a ‘no wrong door’ approach.
• Supporting and promoting physical and mental wellbeing: 
data and evidence consistently shows how taking part in
cultural and creative activities are fundamental to physical
and mental wellbeing. 
• Placing communities at the heart of how we work: we will
support community-led culture and creativity to thrive in our
rural localities, recognising its diverse needs and priorities from
those of Perth City. We will make community co-creation of
cultural programmes central to how we work, supporting our
funded organisations to do the same. 
Perth and Kinross Council | Cultural Strategy 2023-202818
3
Page 70 of 144

Page 71

Perth and Kinross Council | Cultural Strategy 2023-202820
Key Facts
In developing this Strategy we have looked at the key baseline
data and evidence for participation in culture. This is central to
understanding how best the Council and its partners can target
resources in a particularly challenging financial context in the
years ahead. Some data and evidence about participation is
limited, both nationally and locally. The impact of COVID-19 on
participation and the financial stability of cultural organisations
over the long-term is still emerging. However, there are some
important key facts to highlight about cultural provision and
participation in Perth and Kinross.
• We have over one million cultural participations each year…
• … but only 8.3% of people in our more socio-economically
deprived communities participate in culture.
• Before COVID-19, we welcomed nearly 150,000 UK and
international tourism visitors to the area annually, who spent
more than £71 million per annum.
• We have more than 1,500 people working in the cultural
industries in the area, which is now a UNESCO City of Craft.
• Our huge rural geography makes connections with Perth City
challenging and this also affects our nighttime economy. 46%
of Perth and Kinross residents never visit Perth at night.
• Events in Perth and Kinross provided a £19.4M economic
impact in 2019-2020.
Our key cultural assets are mapped on the next page.
Regionwide:
• Perthshire Open Studios
• Perthshire Artisans
The Strategic Context3
Page 71 of 144

Page 72

Perth and Kinross Council | Cultural Strategy 2023-202822 Perth and Kinross Council | Cultural Strategy 2023-2028 23
Council Investment
• Capital investment of £53M since 2012 including Perth
Creative Exchange, Perth Museum, Perth Theatre, St Paul’s
Church, City Centre Lighting Strategy 
• Annual revenue funding:
- £3.3M on public libraries, archives, museums
- £1.1M Perth Theatre and Concert Hall
- £110K on Community Arts projects funded through
Community Investment Fund, Common Good/other
small grants
- £100K on City Centre Cultural Events
- £265K Pitlochry Festival Theatre/other third party
grants
New Developments
Perth Museum is a £26.5M museum set to open in 2024 in the
centre of Perth. The museum will tell the story of Perth and Kinross’
ancient roots through social and natural history with the iconic
Stone of Destiny, also known as the Stone of Scone, at its heart. The
Stone of Destiny will be free to view. There will also be an opening
exhibition which will be supported by family activities and events.
Perth Museum, which will be managed in partnership between Perth
and Kinross Council and Culture Perth and Kinross, is supported by
£10M from the UK Government as part of the Tay Cities Region Deal
– a £700 million regional investment programme jointly funded by
the UK and Scottish governments and regional partners.
Perth Art Gallery will now focus on modern Scots through the
development of art and design in the region up to the present day.
The new Perth Museum in City Hall and the redeveloped Perth Art
Gallery on George Street will double the amount of display space
currently available in the Fair City, allowing more objects and
artworks to be seen by the public than ever before, with the purpose
of driving increased tourism and investment to the region.
The Scottish Crannog Centre in Aberfeldy is also undergoing a major
redevelopment in a new site, with the first phase expected to open
in summer 2024, with further phases to follow.
UNESCO City of Craft and Folk Art
Perth was designated a UNESCO City of Craft in late 2021 – the
only City of Craft in the UK - and in developing this Strategy we
have listened to ideas from local craftspeople and makers about
how to maximise all the benefits which UNESCO City Status can
bring. We have also started developing links with cities across the
UK and globally where we have shared ground and can exchange
knowledge and skills on making our city world-class in terms of our
culture and our craft.
Craft in Perth and Kinross is an inclusive term that encompasses
skilled makers and creators, artists and practitioners of all sorts. It
includes stagecraft and the craft of songwriting and storytelling.
It includes the craft of making the food and drink including gin,
chocolate, whisky and tea which is internationally renowned as
coming from Perth and Kinross.
We have work underway to promote our craft trails and visitor
itineraries including all major art venues and craft centres and
to promote our local makers and craftspeople to increase their
profiles nationally and internationally, including how they find new
routes to selling their work.
We will be working with the UNESCO network both in Scotland,
to become part of the UNESCO Scotland Trail which launched in
2022 and is backed by VisitScotland, as well as with the 48 other
UNESCO Cities of Craft around the world.
The Strategic Context3
Page 72 of 144

Page 73

Perth and Kinross Council | Cultural Strategy 2023-202824 Perth and Kinross Council | Cultural Strategy 2023-2028 25
Rural Cultural Hubs
Culture is part of the lifeblood of rural communities. It connects
people through shared experiences, social networks and it can be a
vital part of the rural tourism economy.
It thrives when a number of factors are in place including:
• a strong Story of Place – what makes the locality culturally
distinct from others?
• empowered communities who are actively involved in creating
and managing access to local culture and heritage;
• a shared focus on the key cultural strengths and assets in the
local area rather than on conflicting or duplicating initiatives.
We have a strong network of community-led and wider cultural
organisations, festivals and venues across Perth and Kinross. During
the lifetime of this Strategy we will work with our rural areas to
define their key cultural assets and shape their distinct cultural
‘brand.’ This will build stronger collaborations between community
organisations, the Council and other partners to make the cultural
distinctiveness of each rural area shine. Each locality is different,
and together with the rapidly emerging cultural profile of Perth,
they collectively bring our cultural story to life.
Culture and the Economy
Culture and creativity changes lives, improving educational
outcomes, quality of life and opens our minds to new ideas, new
people and experiences. But it does also make money and is
essential to our local and national economies.
Culture and creativity is a key driver for tourism in Scotland with
visitors looking for new and authentic ways to engage in making
and seeing art, music and theatre. In Perth and Kinross we are
working together with our visitor and tourism attractions to ensure
that there is a wide and varied choice of cultural activities for
visitors and local residents to enjoy and participate in.
The UNESCO City of Craft designation is a potential key economic
driver for creativity, opening new centres for knowledge exchange,
sales routes and projects with cities around the world.
As the new museum opens in Perth, with ambitious income and
visitor targets, we will continue to ensure that culture and creativity
are central to the economic success of the area.
The Digital Revolution
Digital cultural offerings which have emerged during and since the
COVID-19 pandemic are revolutionising how we make and access
culture. They include hybrid festivals which people can attend in
person or stream live online. They allowed many people to access
culture for free or inexpensively from their living rooms. This has
democratised culture in some ways making it accessible for people
who cannot travel for whatever reason.
User-generated cultural content is also a huge new aspect of how
people participate in culture, with many new channels for making
and disseminating it.
And the digital revolution has brought challenges too. Culture is a
social activity, but in-person audiences for theatre and cinema are
only slowly returning to pre-pandemic levels. Ticket purchasing has
changed – people are making decisions later, leaving programme
and cash flow challenges for some organisations.
The Strategy aims to respond to these opportunities and
challenges, including supporting ways in which communities can
use digital resources to make local culture and heritage accessible
to more people.
The Strategic Context3
Gaelic
We recognise the important contribution Gaelic has made to
our past, our history and our living culture, and Perth and Kinross
Council will continue to support this through our Gaelic Language
Plan.
The Gaelic Society of Perth, established in 1880, has supported and
promoted Gaelic across three centuries. The Perthshire & Angus
Mòd delivered by the Aberfeldy & District branch of An Comunn
Gàidhealach takes place in Aberfeldy attracting over five hundred
entries annually. A range of Gaelic music, arts and literature events
are included in the annual programme of events at Perth Concert
Hall, Birnam Institute, Pitlochry Festival includes visits from the Fèis
Rois and Fèis Spè Cèilidh Trail.
Perthshire is home to two Gaelic Choirs - Aberfeldy Gaelic Choir
who celebrated their 50th Birthday in 2017 and Perth Gaelic Choir
who re-founded in 2012.
The Royal National Mòd returned to Perth in 2022, the first time
the event has been held in the area since 2004 and was a huge
success, with more than 7,500 people visited the region for the
festival, supporting the equivalent of about 30 full-time jobs. The
total economic boost to the city and surrounding area was £2.5
million and it was estimated that a further £1m could be spent in
Perth by Mòd attendees returning to the city in the future after
enjoying their visit in October.
Page 73 of 144

Page 74

Perth and Kinross Council | Cultural Strategy 2023-2028 27
4
Our vision for culture in Perth and Kinross is:
We will enable creative communities
and outstanding creative work to
thrive in Perth and Kinross, through
partnership.
In developing this vision we engaged with communities across
Perth and Kinross during 10 public consultation sessions in-person
and online. We also held workshops with key cultural organisations
from across the area and engaged with Creative Scotland and
Museums Galleries Scotland.
We asked communities to help us carry out a SWOT analysis
summarising the key strengths, weaknesses, opportunities, and
threats facing our current and future cultural offer.
We used this information to create our high-level Cultural Pledges
which will deliver the vision. Each pledge has key Actions setting
out how we will achieve it in detail. In particular we have tried to
reflect the different priorities and needs of our rural communities
alongside the ongoing culture-led regeneration of Perth City, as
the main economic hub for the area.
Our Action Plan is for just one year at a time and will be reviewed
regularly to ensure this Strategy is agile and relevant.
Our Vision and Cultural Pledges
Perth and Kinross Council | Cultural Strategy 2023-202826
Page 74 of 144

Page 75

Perth and Kinross Council | Cultural Strategy 2023-202828 Perth and Kinross Council | Cultural Strategy 2023-2028 29
1. We will celebrate our cultural diversity
and make culture in Perth and Kinross
accessible for everyone.
We welcome everyone here and want people to celebrate
their heritage, their contemporary culture, and their home.
We will do this by developing and delivering a diverse
programme with our cultural partners and communities to
broaden audiences and participation in culture from across
the whole area too. This includes enabling digital culture to
flourish; ensuring that partners and cultural organisations
have strong Equalities, Diversity, and Inclusion plans
in place so that together, we make Perth and Kinross
welcoming and accessible for all.
The cost-of-living crisis is now hitting many people, and
this will increase barriers to participation for some. Where
we can, we will work with partners to mitigate the cost of
cultural engagement. This includes a mixture of free and
paid events, maximising digital participation opportunities,
and seeking additional funding from business and other
sources to fund opportunities to participate.
Action Lead Resources Success Measure Deadline
We will continue to deliver the new Perth Museum
project with a vibrant inclusive community
engagement programme.
Design the Year 1 opening programme and ensure all
partnership relationships are in place.
PKC
Culture Perth
and Kinross
Historic
Environment
Scotland
Existing capital,
revenue and
staff resources
Full Business Case targets for
visitor numbers delivered.
Number of community
engagement participants in Perth
Museum programmes.
2024 public programmes planned
and approved by Perth Museum
Project Board.
September
2023
We will support all funded partners to develop and
publish their EDI Plans.
PKC
Equalities
Existing staff
resource
Published EDI plans for each
funded organisation.
March 2024
We will launch our Invest in Culture and Sport
programme to raise £5M additional funding from
business/other sources to fund free and subsidised
access to culture.
PKC
Perth City
Leadership
Forum
Community
Planning
Partnership
Existing staff
resource
£1M committed or raised in Year 1. Launch
June 2023
We will support partners and local festivals to access
funding enabling them to grow their digital and
hybrid cultural programmes.
PKC Existing staff
resource
PKC Digital
Inclusion Fund
National
funding sources
Number of additional cultural
participations.
Additional funding accessed by
partners for digital participation.
March 2024
- ongoing
4Our Cultural Pledges
We will deliver our vision through Cultural Pledges, developed
through consultation with our communities and stakeholders.
Our Vision and Cultural Pledges
Page 75 of 144

Page 76

Perth and Kinross Council | Cultural Strategy 2023-202830 Perth and Kinross Council | Cultural Strategy 2023-2028 31
Action Lead Resources Success Measure Deadline
Perth Theatre and Concert Hall will continue to
champion diversity onstage and off, and working
closely with local communities to reflect their
diversity and providing opportunity for artists from
diverse backgrounds to perform on our stages.
Perth Theatre
and Concert
Hall
Existing
resources
Programme reflects interests of
local people; onstage diversity
continue to develop.
March 2023 
- ongoing
Pitlochry Festival Theatre will ensure that all
audiences, artists, participants and workforce will
have parity of physical access across our buildings
resulting in increased employment for and increased
participation by people who are disabled, deaf, living
with disabilities and/or have a long-term medical
condition.
Pitlochry
Festival
Theatre
Existing
resources and
new capital
build
5% of our employment and
training opportunities will be
awarded to people who are
disabled, deaf, living with
disabilities, neurodiversity and/or
a long-term medical condition.
From 2023,
building
towards
2025
Pitlochry Festival Theatre will commission more
women and people who self-define as being from
one of the 9 protected characteristic groups to
make work and support them in their professional
development.
Pitlochry
Festival
Theatre
Existing
Resources
including PKC
and CS funding
50% of new work commissioned
will be by women and people
from the other protected
characteristics.
From 2023,
building
towards
2025
Pitlochry Festival Theatre will continue to engage
with refugee and asylum seeker communities from
across Scotland to offer a safe environment for
participatory activities and performances that speak
to these new arrivals.
Pitlochry
Festival
Theatre
Existing
resources
including PKC
and CS funding
and through
fundraising.
Receive a Sanctuary in Arts Award. 2023 and
ongoing
Action Lead Resources Success Measure Deadline
Scottish Crannog Centre will become a Disability
Confident Leader in Spring 2023. 
Only by employing a diverse workforce will we be
able to engage with diverse communities – we will
employ a diverse workforce that represents the
communities we are here to serve. 
Scottish
Crannog
Centre
Existing staff
resource and
new staff
• Gain Disability Confident
Leader status.
• Develop a new NPA in green
woodworking and deliver its
first year.
• Run 6 immersive online
workshops with Glasgow
Association for Mental Health.
• Grow our online presence with
24 podcast episodes building
on the success of our pilot year.
• We will launch new online
content to increase accessibility,
with 1 full-length documentary
released in Summer on YouTube. 
Spring 2024
The trustees of Innerpeffray Library will develop
new events and exhibitions to ensure the library is
accessible to all.
Innerpeffray
Library
Existing staff
resource
One exhibition per year plus
Festival of reading to increase
engagement
September
2023
4 Our Vision and Cultural Pledges
Page 76 of 144

Page 77

Perth and Kinross Council | Cultural Strategy 2023-202832 Perth and Kinross Council | Cultural Strategy 2023-2028 33
2. We will ensure culture and heritage are
integral to Placemaking decisions
Culture is integral to Placemaking and how we reinvent
our High Streets and public realm, making them inclusive,
welcoming places for people to meet, enjoy and experience
culture and feel a sense of belonging. 
Our High Streets were facing huge challenges before the
COVID-19 pandemic, and retail is suffering further in the cost-
of-living crisis. With a lack of shops to attract people into our
city centres, restaurants and cafés will also suffer meaning
fewer jobs, a lack of choice for local people and for tourism
visitors. 
We already have major projects underway in Perth City and
alongside we will also find new uses for vacant shops as places
for temporary art installations, pop-up shops, and opportunities
for our makers and creatives to sell and show their work. This
work involves many partners – commercial landlords, local
businesses, Council services, cultural organisations, artists
and makers. Strong collaborative working will be essential to
achieve our shared objective of imaginatively reinventing our
High Streets for the benefit of our communities.
Actions Lead Resources Success Measure Deadline
Cultural Hubs – we will work with the 6 key towns
across Perth and Kinross to develop their cultural USP
and brand, creating a stronger cohesive cultural offer
across Perth and Kinross.
PKC Cultural
Programmes
Manager
Existing staff
resource
Cultural USP/brand in place for all
6 towns.
Shared agreement on priority
cultural assets in each locality as
part of Place Plans/Community
Action Plans.
March 2024
Establish a Culture Champions network of visitor
services staff in our hotels, food and drink venues,
transport hubs etc to provide consistent, clear and
positive messages welcoming visitors to Perth.
PKC/
Perth City
Leadership
Forum
Chamber of
Commerce
TBC Number of participating
organisations.
Launch
March 2024
Develop a range of ‘oven-ready’ proposals for
vacant shop premises working with national cultural
organisations, landlords, artists and makers.
PKC Vacant
Properties
Working Group
Action Plan for Vacant Properties
in place.
From March
2023
4 Our Vision and Cultural Pledges
Page 77 of 144

Page 78

Perth and Kinross Council | Cultural Strategy 2023-202834
Action Lead Resources Success Measure Deadline
We will establish a baseline of data for cultural
participation across localities. This will enable us to
track progress in widening participation.
PKC Existing R&D
recourse plus
analytical
support via
Creative
Scotland
Effective system for collating
and analysing baseline data
developed.
Participation levels.
Volunteers actively engaged in
community-led culture.
Launch
September
2023
We will develop knowledge exchange partnerships
with other areas in the UK and beyond which are
developing new and best practice in community
co-creation, including through our UNESCO City
networks.
PKC and
partners
Existing
resources
One knowledge exchange
initiative per year.
March 2024
– ongoing
Embed community co-creation projects across
all permanent and temporary displays at newly-
refreshed Perth Art Gallery.
Culture Perth
and Kinross
Existing
resources
Increased participation from key
communities of geography and
interest.
April 2023 
– ongoing
Perth Theatre and Concert Hall will build on its
community engagement programme and models to
further develop onstage work with and performed by
local people.
Perth Theatre
and Concert
Hall
Existing
resources
Community events featured in
Perth Theatre and Concert Hall
programme.
April 2023 
– ongoing
Pitlochry Festival Theatre will continue to work
with community organisations and people of all
ages in our local communities to create work and
performance opportunities.
Pitlochry
Festival
Theatre
Existing
resources
including PKC
and CS funding 
Performance events in all theatre
spaces and in the community.
April 2023 
– ongoing
Through collaboration and co-creation with local
community partners we will link our community and
wellbeing activities to our main events programme. 
Strathearn
Arts
Existing staff
resource
Increased participation and
engagement with new and
existing community groups. 
March 2024
We want to ensure our cultural programmes reflect the
voices of local communities by listening and understanding
what communities want to see and make. This is vital to
broadening participation in culture amongst communities
of both geography and interest. And it is vital to supporting
volunteering in local culture and heritage, something we
know declined during the COVID-19 pandemic.
Our partners already have strong co-created programme
elements in what they do and we will support them to build
on these strengths.
4 Our Vision and Cultural Pledges
3. We pledge to make co-creation with
local communities central to our cultural
programmes.
35
Page 78 of 144

Page 79

Perth and Kinross Council | Cultural Strategy 2023-202836 Perth and Kinross Council | Cultural Strategy 2023-2028 37
4. We pledge to develop new partnerships
locally, nationally and internationally and
strengthen the ones we have, bringing
significant culture and new work to local
audiences.
Perth and Kinross has strong ties nationally and
internationally, working with partners across Scotland
and the globe to make and bring the best work to the
area. We will work with all our partners to strengthen and
cement those ties, including with national agencies such as
Creative Scotland, Museums and Galleries Scotland, Event
Scotland, and Historic Environment Scotland. Additionally,
we will create new collaborations and partnerships where
we can, ensuring that our world class makers and creatives
are seen by everyone.
Action Lead Resources Success Measure Deadline
Continue to build our partnership with Historic
Environment Scotland and other key partners to
interpret the Stone of Destiny and its move to
Perth Museum.
PKC
Culture Perth
and Kinross
Existing staff
resource
Joint interpretation, education
and marketing plans in place.
March 2024
Participate in the UNESCO Scotland Cities trail
and develop further UNESCO partnerships
globally.
PKC Existing staff
resource
Evidence of trail and partnerships. June 2023
Attract high-profile work to our museums and
venues.
Culture Perth
and Kinross
Existing staff and
external funding
through Museums
Galleries Scotland,
Creative Scotland
etc
Number of exhibitions with loans
and writers appearing at festivals.
April 2023 
– ongoing
Pitlochry Festival Theatre will continue to work in
partnership and co-production with national and
international venues to bring theatre work of the
highest quality to Perth and Kinross.
Pitlochry
Festival
Theatre
Existing resources
including PKC and
CS funding
The range and number of high-
quality co-productions in the
Artistic programme.
April 2023 
– ongoing
4 Our Vision and Cultural Pledges
Page 79 of 144

Page 80

Perth and Kinross Council | Cultural Strategy 2023-202838 Perth and Kinross Council | Cultural Strategy 2023-2028 39
5. We pledge to maximise spaces and places for
creative activity across all our localities.
During the consultation for this Strategy many communities
talked about their desire for more cultural spaces and venues.
However, we have a strong network of buildings from village
halls to Community Campuses and schools, vacant shops, Perth
College, our many existing cultural venues and other public
buildings. We must maximise use of all these spaces to help
broaden participation in culture and work with our communities
to empower them to use and run the spaces in their areas. The
Council will not be able to make further substantial investment
in new cultural buildings in the years to come, so we must
remove barriers to using the spaces we already have. Part of this
is ensuring buildings are managed efficiently and the Council’s
cultural venues meet national carbon reduction targets.
Develop and identify spaces to produce work and allow
creativity by end of summer 2023, with a searchable directory
around studio space, exhibition space and hireable rooms for
groups. Groups should also be encouraged to share space where
possible, identifying where there is need in an area, where there
are groups who do own space and working to find ways to share
the space to reduce costs for all.
Action Lead Resources Success Measure Deadline
We will review PKC grants including the Community
Investment Fund and Common Good to ensure
criteria prioritises cultural activity which is
community-led and reduces inequalities.
PKC Existing staff
resource
Number of community-led
cultural initiatives supported by
PKC grants.
June 2023
We will review and improve venue booking
processes so all spaces can be viewed and booked
via a ‘one-stop-shop’ portal and to enable shared
space opportunities for smaller organisations.
PKC Existing staff
resource
Portal established and feedback
from community culture and
heritage organisations.
Scoping/costing
by September
2023 and
implementation
timeline agreed
We will support creative learning opportunities
across a range of locations including Creative
Exchange and the Maker Spaces in libraries.
Culture Perth
and Kinross
Existing staff
resource
Number of workshops, users and
events.
April 2023
We will support upcycling and low-cost ways to
make creative items including through a pilot
project at AK Bell Library, working with Re:Made
Crieff and through strengthened craft connections
built through our UNESCO City of Craft status.
Culture Perth
and Kinross,
PKC and
others
Funding
from Scottish
Libraries
Information
Council and
John Lewis
Circular Fund
Number of users, events and
workshops.
April 2023 -
ongoing
We will work with our funded partners to ensure
high quality rural and touring work is delivered
across Perth and Kinross, for example, the ‘Gig on a
Truck’ programme.
Perth Theatre
and Concert
Hall
Existing
resource and
external funds
Community-led festivals and
events.
2023 onwards
4 Our Vision and Cultural Pledges
Page 80 of 144

Page 81

Perth and Kinross Council | Cultural Strategy 2023-202840 Perth and Kinross Council | Cultural Strategy 2023-2028 41
6. We pledge to use data and evidence collaboratively
to shape programmes which are well tailored to
audiences and increase participation by growing new
audiences. 
All our key cultural partners use data and evidence to build
understanding of their own audiences. But that knowledge is not shared
and developed, which would enable better integrated programmes
which are well-targeted at local, UK and international audiences and
build audiences for the Perth and Kinross cultural offer a as whole. This is
also a key EDI issue – we need to better understand why people do not
participate in culture and develop programmes which will engage and
appeal to them. 
Horsecross Arts is developing the Perthshire Box Office to sell and market
tickets for organisations across Perth and Kinross, allowing a much greater
understanding of data and audiences. This will be a huge step forward.
During our consultation, our key partners agreed to collaborate more on
marketing and promotion of cultural programmes to achieve a bigger
‘reach’ across Perth and Kinross, Scotland and further afield, and to avoid
programme clashes and duplications. This also needs to include the
Council’s events planning for Perth so that collaborative opportunities
which will bring more people into the city centre can be developed.
Action Lead Resources Success Measure Deadline
Create a Joint Programming Forum where ideas
can be confidentially shared whilst enabling more
effective programme and marketing decisions to be
made.
Include audience data-sharing protocols compliant
with GDPR.
PKC
Cultural
Forum 
Existing staff
resource
Well-integrated joint programme
plans in place.
Increased participation across 
participating venues (baseline to
be established 2023-2024).
Launch
March 2023
Support Perth Theatre and Concert Hall to establish
and embed a Perthshire Box Office.
Perth Theatre
and Concert
Hall/PKC
PKC grant
funding –
match funding
required
Growth in overall ticket sales
(baseline to be established
2023/2024).
April 2023
Support Cultural Forum training on data-sharing and
data analysis.
PKC Existing staff
resource
Better data-sharing between
cultural organisations.
March 2023
Pitlochry Festival Theatre will continue to work with
The Audience Agency, TRG Arts Consultancy, Purple
7 Consultancy, audience and focus group feedback
to shape our Artistic programme to increase the
number and diversity of audiences and visitors to the
Theatre.
Pitlochry
Festival
Theatre
Existing
resources
including PKC
and CS funding
Increase in number and diversity
of people who attend the Theatre.
April 2023 –
ongoing
4 Our Vision and Cultural Pledges
Page 81 of 144

Page 82

Perth and Kinross Council | Cultural Strategy 2023-202842 Perth and Kinross Council | Cultural Strategy 2023-2028 43
One of the biggest threats we face is the climate
emergency, but our creative people and organisations may
also help find innovative answers.
Perth Leadership Forum wants Perth to be known as the
greenest small city in Europe and we will work with them
by suggesting speakers for their conferences and cross-
marketing their events.
As a UNESCO City we must adhere to the UN Sustainability
Goals, and we will promote these so that makers,
craftspeople, and organisations as well as people who buy
craft from Perth and Kinross can make decisions based on
these important principals.
Action Lead Resources Success Measure Deadline
We will create a Carbon Emissions Reduction Plan as
part of our One Culture and Sport Estate programme
for all PKC owned venues to deliver the 2030 Just
Transitions target.
PKC PKC Corporate
Asset
Management
Plan/Property
Services
70% reduction in carbon emissions
across all buildings by 2030: Year 1
target to be defined.
March 2024
- ongoing
Contribute to and support the smallest green city
in Europe ambitions by supporting local artists and
makers participate in climate change conferences
and events.
PKC
Cultural
Forum
Existing staff
resource
Local artists and creatives
represented at relevant events.
Ongoing
Promote knowledge of UN Sustainable Development
Goals.
PKC Existing staff
resource
Plan and deliver a social media
awareness campaign.
Ongoing
Support culture and creative environmental
initiatives in local communities.
Culture Perth
and Kinross
Existing staff
resource
Number of active members. Ongoing
We will promote and support the principles of
the Theatre Green Book in production activity to
minimise environmental impact of our onstage work.
Perth Theatre
and Concert
Hall/other
partners
Existing staff
resource
Reduction in carbon emissions
through production activity.
Baseline
to be set
2023-2024
We will work with Creative Carbon Scotland on using
arts activity to promote active and sustainable travel
opportunities to visit Perth and Kinross venues.
PKC/funded
partners
Existing staff
resource
Consultation and Action Plan in
place.
March 2024
4 Our Vision and Cultural Pledges
7.  We pledge to make culture count in
tackling the climate emergency.
Page 82 of 144

Page 83

Perth and Kinross Council | Cultural Strategy 2023-202844 Perth and Kinross Council | Cultural Strategy 2023-2028 45
Action Lead Resources Success Measure Deadline
Pitlochry Festival Theatre is aiming to meet the
targets in the Scottish Government Climate Change
Plan for non-domestic buildings.
Pitlochry
Festival
Theatre
Capital
Funding
• Minimum of 53% reduction in
carbon emissions for the site
based on electrical and gas
consumption for 2018.
• Minimum of 70% of heating
and cooling supplied by low-
carbon heating technology.
• Minimum 20% reduction in
heating demand (in existing
conditioned areas).
Working
towards
2025
We will work to become the most sustainable
museum in Scotland, building with resources
within walking distance of the Crannog Centre.
We will stock the café and shop with local and
Scottish products, and minimise waste by moving
to a paperless marketing strategy and introducing
composting. 
Scottish
Crannog
Centre
Scottish
Government
and Museums
Galleries
Scotland
funding
We will source 28 tonnes of
reed from Tay Reedbeds Nature
Reserve to be used for thatching
the museum buildings. 
50 tonnes of stone to come from
Taymouth Castle.
Turf cut from local farms. 
Deliver training workshops for the
public and craftspeople in dry
stone walling and turf building.
April 2024
Strathearn Arts will be an agent of change and
use the arts to inspire engagement and action on
environmental challenges.
Strathearn
Arts 
 
Existing staff
resource
Embed environment as a core
pillar of our strategy.
March 2024
– ongoing
4 Our Vision and Cultural Pledges
Page 83 of 144

Page 84

Perth and Kinross Council | Cultural Strategy 2023-202846 Perth and Kinross Council | Cultural Strategy 2023-2028 47
8. We pledge to support young people to
learn, work and grow skills through culture.
The next generation of artists, makers, curators, actors,
musicians, and more are essential for the future cultural life
of our area. We will create learning, skills and employability
opportunities for local young people to work in our creative
sectors, with a ‘no wrong door’ approach.
We need to make clear pathways into the creative sectors
for our young people and learn from others who are doing
it well, to encourage apprenticeships and work experience
where possible.
The new bus pass for those aged under 22 allows more
chances for young people in rural areas to travel to take
part in culture and related education and training. The role
of Perth College and the University of the Highlands and
Islands is key in this regard, so we can collectively best serve
the young people who are graduating from there.
4 Our Vision and Cultural Pledges
Action Lead Resources Success Measure Timescale
Knowledge exchange sessions with
organisations who already have successful
apprenticeship schemes in place.
The Scottish
Crannog
Centre
One information session in 2023
as part of the cultural forum to
encourage other organisations to use
apprenticeships.
End of 2023
Encourage take-up of under 22 free bus pass
for young people to enable free travel.
PKC Education Scottish
Government
Number of users of free bus pass. Ongoing
Embedding the voices and perspectives of
young people in the heart of Culture Perth
and Kinross’ programming, events, and
strategy.
Culture Perth
and Kinross
Gannochy Trust
funding
Number of youth collective members
each year.
Starting
April 2023 –
ongoing
Expand our Heritage Pathways programme
for young people in Perth and Kinross. 
Culture Perth
and Kinross
Gannochy Trust
funding
Number of work and volunteer
opportunities for under 26s.
Number of training and awareness
sessions delivered.
Destinations of young people in the
programme.
Starting
January
2023 to
December
2025
We will develop our Learning and
Engagement programme to support young
people’s development and use of arts activity
to develop skills.
Perth Theatre
and Concert
Hall
Existing staff
resource
Work pathways programme
developed with secondary schools
during 2023.
2023
We will build our initiative to develop skills
in the young workforce in production and
technical craft areas.
Perth Theatre
and Concert
Hall
Existing staff
resource
Develop ongoing programme
building on success of youth arts
bursaries (funding dependent).
2023
Page 84 of 144

Page 85

Perth and Kinross Council | Cultural Strategy 2023-202848 Perth and Kinross Council | Cultural Strategy 2023-2028 49
Action Lead Resources Success Measure Timescale
Pitlochry Festival Theatre will offer high-
quality work experience and work placement
opportunities for young people in Perth and
Kinross in all departments of the Theatre.
Pitlochry
Festival
Theatre
Existing resources
including PKC
and CS funding
Established relationships with
schools and FE/HE institutions to
work together to provide bespoke
high-quality opportunities and work
programmes.
2023 and
ongoing
Pitlochry Festival Theatre will continue to
offer creative learning and performance
opportunities for young people through
creative engagement activity and hosting NT
Connections annually.
Pitlochry
Festival
Theatre
Existing resources
including PKC
and CS funding
Annual performance events including
NT Connections Festival.
2023 and
ongoing
Blairgowrie Book Festival engage with schools
via ‘Authors in Schools’ programme.
Bookmark
Festival
Existing
resources
Sustain and develop the programme
to provide a day of reading,
writing, acting and drawing led
by professionals in various primary
schools in or near Blairgowrie. 
2023 and
ongoing 
4 Our Vision and Cultural Pledges
Page 85 of 144

Page 86

Perth and Kinross Council | Cultural Strategy 2023-202850 Perth and Kinross Council | Cultural Strategy 2023-2028 51
Perth was awarded UNESCO City of Craft status in 2021 based
on the heritage of the city and surrounding areas but also
focussed on the future of craft which is essential to the next
chapter in Perth and Kinross’ history. We have more than 1,500
makers and creators living in Perth and Kinross but overall
productivity needs to grow. Craft tourism is a new driver for us,
with a focus on artisan makers as well as craft food and drink.
The new Creative Exchange WASPS building in Perth is already
a success for makers and creatives – it is at capacity and
we are supporting other groups who want to establish more
makers spaces in the area where possible. We have a strong
support network in Perth and Kinross including Growbiz and
Elevator and we will work with them to nurture new and
growing creative businesses.
The Famous Grouse Centre which is located inside the
Creative Exchange, has excellent facilities for makers and
creators and we will work to increase the awareness of that
space as well as makers spaces inside libraries across Perth
and Kinross.
Action Lead Resources Success Measure Timescale
Develop the UNESCO brand in Perth and Kinross by
supporting events and festivals across the whole
area.
PKC  Funding
identified
Deliver support to a number of
new and existing initiatives.
2023
onwards
Increase awareness of the maker spaces in Famous
Grouse and in libraries.
Culture Perth
and Kinross
and PKC
Yes New target of 410 uses of the
makers space in 2023.
2023
Create Makers Drop-In nights in WASPS Creative
Exchange to increase awareness of the building and
the people who work there. 
WASPS/PKC Yes Drop-in nights introduced in
February 2023 and run for six
months.
February to
June 2023
Develop and print a Creative Perthshire map to be
distributed across the whole area.
Perthshire
Open
Studios with
support from
UNESCO City
of Craft
Yes  Number of maps distributed. April 2023
onwards
Support a creative/maker to make new work via a
residency project, then secure funding for next year.
Birnam Arts Yes Applications received and positive
evaluation from the maker/
creative.
Further funding secured. 
Completed
by June
2023
Perthshire Artisans will work with UNESCO City
of Craft to fund 3 Masterclasses over a 12 month
period for Perthshire Artisans to further develop
their business skills, inspire ambition to develop new
markets and improve sustainable practices.
Perthshire
Artisans
Yes Number of attendees. Starting
January
2024
9. We pledge to support and develop our small
creative and craft businesses.
4 Our Vision and Cultural Pledges
Page 86 of 144

Page 87

Perth and Kinross Council | Cultural Strategy 2023-202852 Perth and Kinross Council | Cultural Strategy 2023-2028 53
In developing both this Strategy and our new Sport Strategy
2023-2028, we have identified 5 Strategic Enablers. These are key
building blocks for delivering both Strategies.
Customers and Audiences
• Set up an integrated Young Talent programme across our
key cultural and sport partners offering a range of work
placements, mentoring and other opportunities and with a ‘no
wrong door’ approach – by June 2023.
• Create a ‘one stop shop’ online portal/App for information and
booking culture, physical activity and sports activities – by
March 2024.
Resources
• Establish a One Culture and Sport Estate programme to:
- maximise usage/access for key culture and sports venues;
- ensure venues are managed and operated efficiently,
including through joint management arrangements;
- achieve an integrated approach to reducing carbon
emissions.
• By June 2023.
• Establish an Invest in Culture and Sport initiative:
- with businesses and other partners;
- to generate £5M extra investment in culture, physical
activity and sports programmes over the next 5 years;
- matched with existing Council investment.
• For launch in June 2023.
• Review the Council’s grant schemes:
- including Common Good and the Community Investment
Fund to ensure funding for culture and physical activity/
sport is best directed at community priorities and needs;
- alongside, we will set up a one-stop shop portal for
community culture and sport grants.
• By March 2024
5 Strategic Enablers
Page 87 of 144

Page 88

Perth and Kinross Council | Cultural Strategy 2023-2028 55
We will monitor and report progress by:
• annual reports through the Council’s Corporate Annual
Performance Report and Communities Directorate Business
Management and Improvement Plan;
• an annual update to the Community Planning Partnership
and Integrated Joint Board for Health and Social Care on
contribution to the 2022-2032 Local Outcomes Improvement
Plan;
• an annual Thematic Review by the Council’s Scrutiny and
Performance Committee. This will be informed by any relevant
issues identified through the Council’s Annual Governance
Statement, such as the quality of community engagement on
physical activity and sport. 
Cultural Forum
The Cultural Forum is a network of key cultural organisations in
Perth and Kinross. Each meeting has a focus on learning or training,
joint programming, on collaboration and ideas, on potential
funding applications and ensuring that everyone is working
together to take marketing and communications forward. Perth
and Kinross Council will support the meetings and the venue and
Chair role will rotate. The Forum will also play a role in monitoring
and evaluating delivery progress for the Strategy.
Monitoring and Governance
Perth and Kinross Council | Cultural Strategy 2023-202854
6
Page 88 of 144

Page 89

www.pkc.gov.uk  (PKC Design Team - 2022007)
If you or someone you know would like a copy of this
document in another language or format, (on occasion,
only a summary of the document will be provided in
translation), this can be arranged by contacting the
Customer Service Centre on 01738 475000.
You can also send us a text message
on 07824 498145.
All Council Services can offer a
telephone translation facility.
Page 89 of 144

Page 90

Page 90 of 144

Page 91

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
1
Appendix 2 
Cultural Pledge 1 We will celebrate our cultural diversity and make culture in Perth and Kinross accessible for everyone. 
Cultural Pledge 2 We will ensure culture and heritage are integral to Placemaking decisions. 
Cultural Pledge 3 We pledge to make co-creation with local communities central to our cultural programmes. 
Cultural Pledge 4 We pledge to develop new partnerships locally, nationally and internationally and strengthen the ones we have, bringing
significant culture and new work to local.
Cultural Pledge 5 We pledge to maximise spaces and places for creative activity across all our localities. 
Cultural Pledge 6 We pledge to use data and evidence collaboratively to shape programmes which are well tailored to audiences and increase
participation by growing new audiences.
Cultural Pledge 7 We pledge to make culture count in tackling the climate emergency. 
Cultural Pledge 8 We pledge to support young people to learn, work and grow skills through culture. 
Cultural Pledge 9 We pledge to support and develop our small creative and craft businesses. 
Cultural Pledge 1 – We will celebrate our cultural diversity and make culture in Perth and Kinross accessible for everyone
No. Action Lead Resource Success measure Deadline Progress update
1.1 We will continue to
deliver the new Perth
Museum project with a
vibrant inclusive
community
engagement
programme. Design the
Year 1 opening
PKC, 
CPK,
Historic
Environment
Scotland
Existing
capital,
revenue and
staff
resources
Full Business Case targets
for visitor numbers
(167,000) delivered
Number of community
engagement participants
in Perth Museum
programmes. 2024 public
programmes planned and
September
2023. 
Complete.
Perth Museum opened on the 30
March 2024 with a weekend of events
and celebrations. By 30 November
2024 the Museum had received
210,615 visitors. 
The Cairncross Gallery also includes
work by 6x artists commissioned to
8
Page 91 of 144

Page 92

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
2
No. Action Lead Resource Success measure Deadline Progress update
programme and ensure
all partnership
relationships are in
place.
approved by Perth
Museum Project Board
create banners/standards which tell
Perthshire stories through visual art in
co-creation with members of the local
community as a large-scale
community engagement project with
links to our UNESCO City of Craft and
Folk Art designation. Linking with the
banners project, 6 workshops were
offered alongside the museum
opening programme, the workshops
were held in Average Gallery and
encouraged the community to engage
without the threshold paralysis which
may have impeded engagement with
the museum itself.
1.2 We will support all
funded partners to
develop and publish
their EDI Plans
PKC
Equalities
Existing
staff
resource
Published EDI plans for
each funded organisation
October
2026    
Perth & Kinross Council update - The
Equalities Strategic Forum brings
together PKC and external partners. 
PKC's Learning Programme is available
to all Forum members, and equalities
learning features within this. 
Perth Theatre and Concert Hall
update - implemented our IDEA
(Inclusion, Diversity, Equality &
Accessibility) plan in 2022/23, which is
further supported by our
comprehensive strategy until 2027/28. 
Starting from a position of Inclusion
being fundamental to our activities, we
are striving for a future in which the
Page 92 of 144

Page 93

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
3
No. Action Lead Resource Success measure Deadline Progress update
performing arts are essential to our
communities. Our commitment to
IDEA is, therefore, central to all
policies and processes, and by
undertaking continual review and
training, we monitor and are
transparent about our progress. 
Taking a holistic approach towards
embedding IDEA, our strategic
objectives are to: 
Internally: 
- Attract, develop, and retain a
workforce that reflects the diversity of
the communities we serve. 
- Build a shared understanding of our
obligations and support staff in
adhering to best practices.
- Follow and meet the goals of the
Scottish Government’s Fair Work First,
enabling all employees to reach their
full potential. 
Externally: 
- Engage with and listen to our
communities, responding to their
needs and motivations.
- Programme and support artists to
produce work that is authentic and
respectful in representing their
experiences. 
Page 93 of 144

Page 94

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
4
No. Action Lead Resource Success measure Deadline Progress update
- Improve access to and increase the
visibility of our work, offering multiple
entryways and overcoming barriers to
attendance.
1.3 We will launch our
Invest in Culture and
Sport programme to
raise £5M additional
funding from
business/other sources
to fund free and
subsidised access to
culture
PKC, 
Perth City
Leadership
Forum, 
Community
Planning
Partnership
Existing
staff
resource
£1M committed or raised
in Year 1
October
2026
Action to be reviewed.
1.4 We will support
partners and local
festivals to access
funding enabling them
to grow their digital and
hybrid cultural
programmes
PKC Existing
staff
resource,
PKC Digital
Inclusion
Fund,
National
funding
sources
Number of additional
cultural participations.
Additional funding
accessed by partners for
digital participation
October
2026
Perth Theatre & Concert Hall update
- In June 2024, through the Perthshire
Box Office, Perth Theatre and Concert
Hall launched our online shop PBO+. 
Working with artist, The Grey Hill and
local playwrights, this shop is
designed to incentivise people to
attend live events and to enable those
who are unable to visit to engage with
artistic content digitally. 
From 2025/26, we will also sell e-
books of classic theatre texts in
partnership with Bloomsbury and LA
Theatre Works with The Grey Hill
developing AI algorithms to convert
online buyers into live event bookers.
Page 94 of 144

Page 95

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
5
No. Action Lead Resource Success measure Deadline Progress update
1.5 Perth Theatre and
Concert Hall will
continue to champion
diversity onstage and
off, and working
closely with local
communities to reflect
their diversity and
providing opportunity
for artists from diverse
backgrounds to
perform on our stages
Perth Theatre
and Concert
Hall
Existing
resources
Programme reflects
interests of local people;
onstage diversity
continues to develop
October
2028
Although our approach is to support IDEA
in the broadest terms and across all
protected characteristics, ongoing
monitoring of audience and employee
data has revealed the under-represented
segments for which Perth Theatre and
Concert Hall's IDEA strategy can have the
most significant impact. Our priority
outcomes until 2027/28 are to: 
Ethnicity – increase engagement from
Eastern European communities by an
avg. of 18% year-on-year:   
- To begin with, 4.7% of the local authority
population are first- and second-
generation Poles. However, our figures
suggest that since reopening (October
2021), less than 1% of our audiences have
been from the Polish community, while
3% of staff identify as such. We also know,
anecdotally, that there are smaller
pockets of Bulgarian, Ukrainian,
Romanian and Roma communities across
the region who we need to increase
engagement with; 
- Through our current five-year focus on
Developing Audiences from the Polish
Diaspora, responsive pricing, promotion
and programming are intended to broaden
appeal amongst this group and reach
other Eastern European communities
Page 95 of 144

Page 96

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
6
No. Action Lead Resource Success measure Deadline Progress update
organically. Supporting programming
partners include Friends of Bydgoszcz
(Perth’s twin city), Cryptic, Ela Orleans,
Filmograf, Graeae Theatre Company, the
Illuminated Film Company, Nicola
Werenowska and Wojtek Animation;  
- Working with local school, the Centrum
Edukacyjne Bajka, we will target vacancies
and new skills development projects,
Perth Youth Theatre Production and The
Collective, to their 400+ students to
increase our recruitment pipeline and will
collaborate with Ando Glaso to shape a
new participatory project with musicians
from our former Gordon Duncan
Experience traditional orchestra and their
youth ensemble, Zor.    
Sexual Orientation - increase
engagement from the LGBTQIA+
community by an avg. of 13% year-on-
year: 
- While 12.5% of staff identify as such,
over 2023/24, engagement from
LGBTQIA+ audiences remained stagnant
at 3%. Forming a cross-organisation
group, coordinated through our Employee
Forum, of those with lived experience and
allies, we need to understand why and
work with our teams to increase reach;  
- As a starting point, we are doing so
Page 96 of 144

Page 97

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
7
No. Action Lead Resource Success measure Deadline Progress update
through a new project, the three-year
(minimum) Teenage Fanclub, leading to
the formation of a Youth Board and
working with our artists and young people
to devise wider Learning & Engagement
opportunities for our own-produced work
including The Rainbow, Footnotes to a
Rendezvous and Dance of Death;  
- We will also pursue new programming
and development opportunities for local
queer artists through Gig on a Truck and
125 Live! Three-year sponsorship from St
Johnstone Football Club is confirmed,
with their board planning to use this
opportunity, in part, to inform their own
efforts in increasing LGBTQIA+
representation in local sport.    
SIMD – increase engagement from areas
of socio-economic deprivation by an
avg. of 5% year-on-year:   
- 5% of staff indicate that they are from
lower socio-economic backgrounds, and
audiences registering on the Scottish
Index of Multiple Deprivation encompass
the above segments, plus couples and
individuals aged 51-65, 13% of whom are
based in Perthshire and young families
between 26-50, 4% of whom are based in
Perthshire and identify as White British;  
- Through our participatory projects and
Page 97 of 144

Page 98

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
8
No. Action Lead Resource Success measure Deadline Progress update
partnerships, particularly those delivered
in community settings, we have
succeeded in involving more socio- and
economically disadvantaged groups.
However, we need to encourage cross-
over public engagement with our on-stage
work through the above projects and
community productions; 
- We will increase accessibility through
our Perthshire Box Office and Theatre Bus
initiatives, 125 Live! will trial a Ticket Bank
encouraging bookers to give the gift of
tickets by donating at check-out, and
across own-produced studio shows, we
will use Pay What You Decide models
when appropriate whilst continuing to
fundraise for allocations of discounted or
free tickets for mainstage productions and
the Perth Concert Series. Learning &
Engagement will also broaden our well-
established bursary scheme across future
projects;  
- Working with Perth UHI, NEETS Perth,
local schools, and through the Scottish
Government’s Developing the Young
Workforce initiative, we will also target
vacancies and new skills development
projects whilst supporting the college’s
annual scholarship programme for local
employers.   
Page 98 of 144

Page 99

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
9
No. Action Lead Resource Success measure Deadline Progress update
1.6 Pitlochry Festival
Theatre will ensure that
all audiences, artists,
participants and
workforce will have
parity of physical
access across our
buildings resulting in
increased employment
for and increased
participation by people
who are disabled, deaf,
living with disabilities
and/or have a long-
term medical
condition.
Pitlochry
Festival
Theatre
Existing
resources
and new
capital build
5% of our employment
and training opportunities
will be awarded to people
who are disabled, deaf,
living with disabilities,
neurodiversity and/or a
long-term medical
condition
October
2028
This is being delivered and is an
ongoing activity.  
1.7 Pitlochry Festival
Theatre will
commission more
women and people
who self-define as
being from one of the 9
protected
characteristic groups
to make work and
support them in their
professional
development.
Pitlochry
Festival
Theatre
Existing 
Resources 
including
PKC 
and CS
funding 
50% of new work
commissioned will be by
women and people from
the other protected
characteristics
October
2028
Achieved target in 2024. In the 2024
season, 50% of the main auditorium
directors were female and 25% had a
physical disability; 50% of the
writers/adaptors of all the plays across
the season were female; 3 out of the 8
play directors were LGBT+.  The
creative team was 50% male and 50%
female and seven of those were from
protected characteristic groups.  The
ensemble comprised 13 female
performers and 11 male performers.
1.8 Pitlochry Festival
Theatre will continue to
engage with refugee
and asylum seeker
Pitlochry
Festival
Theatre
Existing
resources
including
PKC and CS
Receive a Sanctuary in
Arts Award
October
2028 
In 2024, we arranged three visits for
asylum seekers and refugees to visit
the Theatre, two to see the Dress
Rehearsals of productions and one
Page 99 of 144

Page 100

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
10 
No. Action Lead Resource Success measure Deadline Progress update
communities from
across Scotland to
offer a safe
environment for
participatory activities
and performances that
speak to these new
arrivals
funding and
through
fundraising
event - Light, Hope, Joy Day as part of
the Refugee Festival Scotland
programme. In all, we welcomed 73
refugees and asylum seekers to the
Theatre. We regularly attend the
International Cafe and Integrated
Network meetings.
1.9 Scottish Crannog
Centre will become a
Disability Confident
Leader in Spring
2023.  Only by
employing a diverse
workforce will we be
able to engage with
diverse communities –
we will employ a
diverse workforce that
represents the
communities we are
here to serve
Scottish
Crannog
Centre
Existing
staff
resource
and new
staff
a) Gain Disability
Confident Leader status.           
Spring
2024
Achieved Spring 2024.
b) Develop a new NPA in
green woodworking and
deliver its first year.   
Spring
2024
Complete.
This has been developed and is
halfway through first year.
c) Run 6 immersive online
workshops with Glasgow
Association for Mental
Health
Spring
2024
Complete February 2024.
d) Grow our online
presence with 24 podcast
episodes building on the
success of our pilot year.
October
2028
Unable to progress so far due to
capacity but the intention is to revisit.
e) We will launch new
online content to increase
accessibility, with 1 full-
length documentary
released in Summer on
YouTube. Achieved Spring
2024
Spring
2024
Complete.
A full-length documentary is being
worked on.
ACCESS ABLE has been achieved.
1.10 The trustees of
Innerpeffray Library will
develop new events
and exhibitions to
Innerpeffray
Library
Existing
staff
resource
One exhibition per year
plus Festival of reading to
increase engagement
October
2028
The Library has produced a new
exhibition annually and expanded the
programme of events, including
developing the Festival of
Page 100 of 144

Page 101

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
11 
No. Action Lead Resource Success measure Deadline Progress update
ensure the library is
accessible to all
Reading.  Visitor numbers have
increased and so have volunteers and
the numbers of people taking part in
events. 
Cultural Pledge 2 - We will ensure culture and heritage are integral to Placemaking decisions
No. Action Lead Resource Success measure Deadline Progress update
2.1 Cultural Hubs – we will
work with the 6 key
towns across Perth and
Kinross to develop their
cultural USP and
brand, creating a
stronger cohesive
cultural offer across
Perth and Kinross
PKC -
Business,
Place &
Investment 
Existing staff
resource 
Cultural USP/brand in
place for all 6 towns.
Shared agreement on
priority cultural assets in
each locality as part of
Place Plans/Community
Action Plans
October
2028 
To be progressed, linking in with other
pieces of strategic work including the
review of the libraries. 
2.2 Establish a Culture
Champions network of
visitor services staff in
our hotels, food and
drink venues, transport
hubs etc to provide
consistent, clear and
positive messages
welcoming visitors to
Perth
PKC/
Chamber of
Commerce
TBC Number of participating
organisations
October
2028
To be progressed. 
Page 101 of 144

Page 102

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
12 
No. Action Lead Resource Success measure Deadline Progress update
2.3 Develop a range of
‘oven-ready’ proposals
for vacant shop
premises working with
national cultural
organisations,
landlords, artists and
makers
PKC Vacant
Properties
Working
Group
Action Plan for Vacant
Properties in place
October
2028
Perth & Kinross Council update - we
have projects we are keen to develop
and are actively working with relevant
stakeholders to help bring them to
fruition. The project 'Make Room' is an
oven ready project developed by Perth
UNESCO City of Craft and Folk Art
designed specifically for empty shops
and is scalable and replicable as a
case study active research project. 
Perth Theatre & Concert Hall update
- In partnership with Jupiter Artland,
Perth Theatre and Concert Hall was
one of the first organisations to take
over a disused shopfront on Perth High
Street with Rachel McLean's MIMI. 
This immersive installation, with an
accompanying engagement
programme for 15-25 year olds, took
the form of a seemingly abandoned
toyshop and ran from October 2022 -
January 2023.
2.4 We will share culture
and celebrate creativity
within our public realm
and underutilised
spaces (including
vacant shop units)
PKC / Perth
UNESCO City
of Craft and
Folk Art (CPK)
Existing
staff
resource
and external
funding
where
available
Number of public realm
interventions and
development of a creative
pilot project situated in a
vacant shop unit
October
2028
Proposed new action. 
Page 102 of 144

Page 103

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
13 
Cultural Pledge 3 - We pledge to make co-creation with local communities central to our cultural programmes
No. Action Lead Resource Success measure Deadline Progress update
3.1 We will establish a
baseline of data for
cultural participation
across localities. This
will enable us to track
progress in widening
participation
PKC Existing
R&D
recourse
plus
analytical
support via
Creative
Scotland
Effective system for
collating and analysing
baseline data developed.
Participation levels.
Volunteers actively
engaged in community-led
culture
October
2026
Action to be reviewed.
3.2 We will develop
knowledge exchange
partnerships with other
areas in the UK and
beyond which are
developing new and
best practice in
community co-
creation, including
through our UNESCO
City networks
PKC and
partners
Existing
resources
One knowledge exchange
initiative per year
October
2028 
Perth is now the Chair city for the UK
UNESCO Creative Cities Group (there are
13 designations across Northern Ireland,
Scotland, and England) which is primarily
for knowledge exchange between
UNESCO Creative Cities, as well as with
UNESCO HQ and UK Government. 
3.3 Embed community co-
creation projects
across all permanent
and temporary displays
at newly refreshed
Perth Art Gallery
CPK  Existing
resources
Increased participation
from key communities of
geography and interest
October
2028 
Community co-creation work is being
reduced as part of cost saving measures
within the Art Gallery. 
Page 103 of 144

Page 104

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
14 
No. Action Lead Resource Success measure Deadline Progress update
3.4 Perth Theatre and
Concert Hall will build on
its community
engagement programme
and models to further
develop onstage work
with and performed by
local people 
Perth Theatre
and Concert
Hall 
Existing
resources 
Community events featured
in Perth Theatre and Concert
Hall programme 
October
2028 
Perth Youth Theatre continues to present
work on the Main Stage and has been
repositioned as one of Perth Theatre and
Concert Hall’s core five in-house
productions year-on-year. In February
2025, they will perform their first musical,
Stephen Sondheim's Into the Woods,
following Antigone as their first traditional
play (beyond devised work) in February
2024. 
Also this year, as part of 125 Live!, local
community groups and societies with
whom we work in regular partnership,
including Chansons Chamber Choir, Perth
Symphony Orchestra, and Perth UHI
Musical Theatre, will feature prominently
alongside headline acts in our anniversary
celebrations. 
Then, in December, accordionist Ryan
Corbett will undertake a residency to
develop a new participatory performance
of Piazzolla's works. He will hand-pick his
own (and first) tango band and work with
Learning & Engagement and participants
on projects such as Dance for Parkinson’s
to create a mass music and dance event. 
3.5 Pitlochry Festival Theatre
will continue to work with
community organisations
Pitlochry
Festival
Theatre 
Existing
resources
including
Performance events in all
theatre spaces and in the
community
October
2028 
The Theatre runs regular activities with
performance opportunities for people of
Page 104 of 144

Page 105

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
15 
No. Action Lead Resource Success measure Deadline Progress update
and people of all ages in
our local communities to
create work and
performance
opportunities 
PKC and CS
funding 
all ages from the local area.  We are
building relationships with local. 
3.6 Through collaboration
and co-creation with
local community
partners we will link
our community and
wellbeing activities to
our main events
programme
Strathearn
Arts
Existing
staff
resource
Increased participation
and engagement with new
and existing community
groups.
October
2026
1. This activity has just recently
started.  This has made possible
with funding awarded from
Creative Scotland which has
enabled the creation of a new post
- Community Engagement
Lead.  This dedicated post-holder
works directly with community
groups and on community
projects.   
2. A community focussed
environmental festival is being
developed with a view to this
taking place in March 2026. 
3. Reverb Studio is a local artist-
facilitated programme for young
people which is youth-
led.  Working with the local high
school,  we have worked with
young people who have been
identified as having experienced
harassment, bullying and
transphobia.   We will approach
The Gannochy Trust to seek
Page 105 of 144

Page 106

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
16 
No. Action Lead Resource Success measure Deadline Progress update
funding to continue this
programme. 
Cultural Pledge 4 - We pledge to develop new partnerships locally, nationally and internationally and strengthen the ones we have,
bringing significant culture and new work to local audiences.
No. Action Lead Resource Success measure Deadline Progress update
4.1 Continue to build our
partnership with
Historic Environment
Scotland and other key
partners to interpret
the Stone of Destiny
and its move to Perth
Museum
PKC,
CPK
Existing
staff
resource
Joint interpretation,
education and marketing
plans in place
March
2024
Complete. The Stone is on display at
Perth Museum and HES and CPK staff
meet regularly.
4.2 Participate in the
UNESCO Scotland
Cities trail and develop
further UNESCO
partnerships globally
CPK, PKC Existing
staff
resource
Evidence of trail and
partnerships
June 2023 Complete.
Perth was added to the UNESCO Scotland
Trail
(https://www.visitscotland.com/things-to-
do/unesco-trail/perth-city-of-craft). Our
UNESCO City of Craft Focal Point was
voted in as the Coordinator for the UK's 13
UNESCO Creative Cities, disseminating
information from the UK National
Commission for UNESCO and
encouraging knowledge sharing and
community building between
designations. A mandatory part of a
UNESCO Creative City designation is
Page 106 of 144

Page 107

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
17 
No. Action Lead Resource Success measure Deadline Progress update
participation in meetings. Subnetwork
meetings are when all 66 of the Craft
Cities have the opportunity to meet,
collaborate, share knowledge and benefit
from the global network and Annual
Conferences are where all 350 UNESCO
Creative Cities gather  to discuss global
cultural and sustainable policies,
strategies and projects. These meetings
focus on the network as a whole - since
the Focal Point has been in post (January
2024) Perth has been represented in
person at all mandatory meetings. Perth
worked collaboratively with fellow
UNESCO City of Craft, Viljandi (Estonia)
on a showcase at Viljandi Heritage
Festival. This exhibition used Perth Art
Gallery's collections, the cutting-edge
technology in The Famous Grouse Ideas
Centre and the creative mind and skillset
of a local maker to create an exhibition
which represented Perth's printing history,
our technological advancements, and the
local wealth of creativity. Displaying in
Viljandi Heritage Festival meant Perth's
first UCCN collaboration and was a
unique platform to celebrate Perth. 
4.3 Attract high-profile
work to our museums
and venues
CPK Existing
staff and
external
funding
Number of exhibitions with
loans and writers
appearing at festivals
October
2028
All exhibitions feature loans which
have either never been seen within the
region or Scotland previously or which
Page 107 of 144

Page 108

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
18 
No. Action Lead Resource Success measure Deadline Progress update
through
Museums
Galleries
Scotland,
Creative
Scotland
etc
have not been on display for a
significant time.
4.4 Pitlochry Festival
Theatre will continue to
work in partnership
and co-production with
national and
international venues to
bring theatre work of
the highest quality to
Perth and Kinros
Pitlochry
Festival
Theatre
Existing
resources
including
PKC and CS
funding
The range and number of
highquality co-
productions in the Artistic
programme
October
2028
In the 2024, there were three co-
productions with New Wolsey Theatre
in Ipswich, OVO in St Albans and
Firbrand in the Borders.  The Theatre's
production of A Streetcar Named
Desire toured to The Lyceum,
Edinburgh and Aberdeen Performing
Arts, Shirely Valentine also went to The
Lyceum and The Brenda Line
transferred to the Traverse.   
Cultural Pledge 5 - We pledge to maximise spaces and places for creative activity across all our localities.
No. Action Lead Resource Success measure Deadline Progress update
5.1 We will review PKC
grants including the
Community
Investment Fund and
Common Good to
ensure criteria
prioritises cultural
activity which is
community-led and
reduces inequalities
PKC Existing
staff
resource
Number of community-
led cultural initiatives
supported by PKC grants
October 2028 To be progressed.
Page 108 of 144

Page 109

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
19 
No. Action Lead Resource Success measure Deadline Progress update
5.2 We will review and
improve venue
booking processes so
all spaces can be
viewed and booked via
a ‘one-stop-shop’
portal and to enable
shared space
opportunities for
smaller organisations.
PKC Existing
staff
resource
Portal established and
feedback from
community culture and
heritage organisations.
Scoping/costing
by September
2023 and
implementation
timeline agreed
Complete. 
Perth & Kinross Council update -
Perthshire Box Office (PBO) has been
launched following continued
investment from Perth & Kinross
Council (PKC). Pilot stage
commenced in the summer of 2023,
to the formal launch of the new
website and ticketing platform in
January 2024. As the exclusive
ticketing platform for Perth Museum
and the Stone of Destiny, the profile
of PBO has been raised, attracting
considerable national and
international traffic (including the
United States, Canada, Australia and
Germany) through the website. There
is a dedicated PBO team now in
place, and have been working with
new and existing partners to ensure
that the highest level of service is
being offered for their events and
their customers. The team are
focused on increasing customer
sales, through memberships,
subscription offers, bespoke set-ups
and ticket bundles. They are also
looking to now expand the PBO offer
by exploring wider benefits for
businesses in Perth & Kinross,
including advertising, marketing and
co-promotions. Networking
Page 109 of 144

Page 110

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
20 
No. Action Lead Resource Success measure Deadline Progress update
opportunities are also being
planned, as well as recent
conversations with local restaurants
and accommodation providers, to
explore options to build a tourist
ticket ‘package’, offering a
discounted rate when booking
tickets via PBO.  is operational.   
Perth Theatre & Concert Hall
update - Perth Theatre and Concert
Hall's Perthshire Box Office has been
launched following continued
investment from Perth & Kinross
Council (PKC). The pilot stage
commenced in the summer of 2023,
and the new website and ticketing
platform were officially launched in
January 2024. As the exclusive
ticketing platform for Perth Museum
and the Stone of Destiny, PBO has
raised its profile, attracting
considerable national and
international traffic (including from
the United States, Canada,
Australia, and Germany) through the
website. 
A dedicated PBO team is now in
place. They have been working with
new and existing partners to ensure
that the highest level of service is
Page 110 of 144

Page 111

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
21 
No. Action Lead Resource Success measure Deadline Progress update
offered for their events and
customers. The team is focused on
increasing customer sales through
memberships, subscription offers,
bespoke set-ups, and ticket bundles. 
In addition to PBO+, they are looking
to expand the PBO offer by exploring
wider benefits for businesses in
Perth & Kinross, including
advertising, marketing, and co-
promotions. Networking
opportunities are being delivered,
and recent conversations with local
restaurants and accommodation
providers are being conducted to
explore options to build a tourist
ticket ‘package’, offering a
discounted rate when booking
tickets via PBO.
5.3 We will support
creative learning
opportunities across a
range of locations
including Creative
Exchange and the
Maker Spaces in
libraries
CPK Existing
staff
resource
Number of workshops,
users and events
October 2028 The learning offer is currently being
reshaped to better align with
available resources. In 2023/24 there
were 39,340 participants in 1,820
formal learning opportunities
delivered by Culture Perth and
Kinross. Over the same period there
were 30,236 participants in 2,124
informal learning opportunities.  For
the period April 2024 - October 2024
there have been 19,624 participants
in 842 formal learning opportunities
Page 111 of 144

Page 112

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
22 
No. Action Lead Resource Success measure Deadline Progress update
and 23,729 participants in 1,380
informal learning opportunities.
Perth UNESCO City of Craft was
successful in securing UKSPF
funding to open 3 community
cultural assets: a dark room, a glass
kiln, and a ceramics kiln. Housed in
Perth Creative Exchange,  makers
can learn how to use these assets
paying only for what they use as
opposed to high membership fees or
the upfront investment of buying a
kiln for personal use - increasing
access to and participation in (as
well as additional learning
opportunities for) our cultural sector,
as well as highlighting Perth Creative
Exchange as a cultural venue beyond
tenants. 
COMMUNITY ASSETS
In August 2025, Perth UNESCO City
of Craft launched three Community
Assets in collaboration with Perth
Creative Exchange. Housed in Perth
Creative Exchange there is now a
photography dark room, a glass kiln,
and a ceramics kiln available on a
pay-for-what-you-use basis to
increase accessibility and access to
craft facilities within Perth and
Kinross. The assets increase
Page 112 of 144

Page 113

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
23 
No. Action Lead Resource Success measure Deadline Progress update
opportunities for creative and
cultural learning as well as providing 
facilities for local makers to use to
deliver creative workshops and
create additional business
opportunities.   
5.4 We will support
upcycling and low-
cost ways to make
creative items
including through a
pilot project at AK Bell
Library, working with
Re:Made Crieff and
through strengthened
craft connections built
through our UNESCO
City of Craft status
CPK, PKC
and others
Funding
from
Scottish
Libraries
Information
Council and
John Lewis
Circular
Fund 
Number of users, events
and workshops
October 2026 1. The new Lend and Mend service is
now established at the AK Bell
Library. This provides free access to
sewing machines and haberdashery
to encourage people to make and
mend/upcycle clothes and other
fabric based items. The Libraries
now have to Sustainability Officers
working to promote proactive
climate positive activities across all
library venues.                                                                                                                                 
2.  Current discussions around a
collaborative event at AK Bell library
with UNESCO City of Craft, CPK,
Social Flock and local makers which
celebrates mending and upcycling -
using craft techniques to keep
clothes out of landfill. Aiming for
summer 2025 delivery.
5.5 We will work with our
funded partners to
ensure high quality
rural and touring work
is delivered across
Perth and Kinross, for
Perth Theatre
and Concert
Hall 
Existing staff
resource and
external
funds 
Community-led festivals
and events
October 2028 As before, Gig on a Truck returns in
March 2025 through Perth Theatre
and Concert Hall's new sponsorship
with St Johnstone Football Club and
will feature prominently in our 125
Live! celebrations in September.
Page 113 of 144

Page 114

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
24 
No. Action Lead Resource Success measure Deadline Progress update
example, the ‘Gig on a
Truck’ programme  Driven by the significant success of
this project since 2021, in 2023, we
devised a new site-specific
programme until 2027/28. This
began in partnership with Tangled
Feet to deliver Murmrations on the
banks of the River Tay in Dunkeld and
will continue in locations across
Perth & Kinross with projects
including: 
- Red Note Ensemble performing
Philip Glass’ 1000 Airplanes on the
Roof at Perth Airport, Scone in spring
and April Chamberlain’s The Worm
Who Turned as a site-specific
musical in the allotment gardens on
Moncrieffe Island in autumn 2026;
- Heloise Tunstall-Behrens and Tanya
Auclair’s choral piece, The Swarm, in
spring and Maria Braender’s music-
theatre work, Telling the Bees, in
autumn 2027 to mark our first Honey
Harvest from the Perth Theatre
beehives;
- Window to Another World in
partnership with Perth Concert Hall,
Australia, from spring and Matthew
Short’s Cairngorm Connections from
autumn 2028. 
Page 114 of 144

Page 115

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
25 
Cultural Pledge 6 - We pledge to use data and evidence collaboratively  to shape programmes which are well tailored to audiences and
increase participation by growing new audiences
No. Action Lead Resource Success measure Deadline Progress update
6.1 Create a Joint
Programming Forum
where ideas can be
confidentially shared
whilst enabling more
effective programme
and marketing
decisions to be made.          
Increase audience
data-sharing protocols
compliant with GDPR.
PKC,
Cultural
Forum
Existing
staff
resource
Well-integrated joint
programme plans in place.
Increased participation
across participating
venues (baseline to be
established 2023-2024)
October
2026
Commercial sensitivities around
programming make this challenging
however discussion on upcoming
opportunities is included on Cultural
Forum agendas.
6.2 Support Perth Theatre
and Concert Hall to
establish and embed a
Perthshire Box Office
Perth Theatre
and Concert
Hall / PKC
PKC grant
funding –
match
funding
required
Growth in overall ticket
sales (baseline to be
established 2023/2024)
April 2023 Complete. 
PBO now up and running and
supporting an increasing number of
cultural events.
6.3 Support Cultural
Forum training on data-
sharing and data
analysis.
PKC Existing
staff
resource
Better data-sharing
between cultural
organisations
October
2026
Perth Theatre & Concert Hall - Through
PBO and the ALEO Transformation
Review, Perth Theatre and Concert Hall
has offered to support further training
on data-sharing and data analysis and
has entered into data-sharing
agreements with many of the
organisations involved, plus other
service providers across Perth &
Kinross.   
Page 115 of 144

Page 116

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
26 
No. Action Lead Resource Success measure Deadline Progress update
We have also offered evaluation
training to Culture Perth & Kinross and
Live Active Leisure for qualitative data,
having developed a comprehensive
Theory of Change framework for
measuring engagement, which was
implemented in April 2024.
6.4 Pitlochry Festival
Theatre will continue to
work with The
Audience Agency, TRG
Arts Consultancy,
Purple 7 Consultancy,
audience and focus
group feedback to
shape our Artistic
programme to increase
the number and
diversity of audiences
and visitors to the
Theatre
Pitlochry
Festival
Theatre
Existing
resources
including
PKC and CS
funding
Increase in number and
diversity of people who
attend the Theatre
October
2028
Pitlochry Festival Theatre update-
Working with The Audience Agency,
TRG Arts Consultancy, Purple 7
Consultancy, Pitlochry Festival
Theatre, we harness insights and
learning through existing and new
analysis of ticket sales trends,
audience profiling and segmentation,
audience feedback, and online metrics
using our box office system and related
communications software used by our
marketing and communications team
to increase ticket sales. Our audience
profiling builds up a long-term picture
of habits and tastes and we use post-
show surveys to gather and analyse
feedback from our existing audiences.
We review open rates and click rates of
our e-comms as well as tracking and
analysing our social media campaigns
to review success and engagement
and to build up a long term picture of
habits, tastes and opportunities to
shape our programmes and increase
participation.
Page 116 of 144

Page 117

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
27 
No. Action Lead Resource Success measure Deadline Progress update 
Perth Theatre & Concert Hall update
- The Audience Agency, TRG Arts
Consultancy, Purple 7 Consultancy,
audience, and focus group feedback
form part of the data suite used to
shape Perth Theatre and Concert
Hall's Artistic Programme. We have
also supported and contributed to
local and national studies on the
impact of regional theatres through
Data Culture Change and The
Audience Agency.
6.5 Actively engage in
UNESCO's
MONDIACULT activity
to share data, cultural
policy, and climate
change mitigation
within our cultural
sector
PKC/Perth
UNESCO City
of Craft and
Folk Art (CPK)
Existing
staff
resource
and external
funding
where
available
Perth is able to benefit
from the participatory
process of collecting
global cultural policies
and sustainable
development and take
learnings from
international examples
and proven successful
models
October
2028
Proposed new action. 
Cultural Pledge 7 - We pledge to make culture count in tackling the climate emergency
Page 117 of 144

Page 118

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
28 
No. Action Lead Resource Success measure Deadline Progress update
7.1 We will create a
Carbon Emissions
Reduction Plan as part
of our One Culture and
Sport Estate
programme for all PKC
owned venues to
deliver the 2030 Just
Transitions target
PKC PKC
Corporate
Asset
Management
Plan/Property
Service
70% reduction in carbon
emissions 
across all buildings by
2030: Year 1 target to be
defined
October
2028
PKC - Energy management have an
Estate Decarbonisation Plan to 2045
for all Council buildings (160 buildings
modelled) and funding is being sought
for fabric, heating systems and PV
systems on these buildings. 
Perth Theatre & Concert Hall -
Through our Environmental
Sustainability Strategy until 2027/28
and the work of our Green Team, with
staff representatives from every
department, Perth Theatre and
Concert Hall is making significant
strides in reducing carbon emissions
in line with Scotland’s pathway to Net
Zero. 
To continue reducing electricity and
gas consumption, sustainability
efforts include upgrading Perth
Concert Hall's Building Management
System (BMS), investing in LED stage
lighting, installing smart sockets and
thermostats, bee hives on the Perth
Theatre roof, and offering reusable
cups on a deposit-or-donate scheme. 
The funds raised from these and Perth
Theatre Honey, harvested in 2026/27,
will contribute to future greening and
community projects. 
Page 118 of 144

Page 119

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
29 
No. Action Lead Resource Success measure Deadline Progress update 
Our BMS at the Theatre will also be
installed over 2024/25 as part of an
upgrade to all systems on PKC’s
properties. Combined with the Hall’s
installation, these are estimated to
further reduce energy consumption by
about 20%. 
Following the renewal of recycling
contracts, new waste management
policies will not only decrease the
amount of waste going to landfill but
bring these waste contributions to 0%
by 2030. We will also continue to work
with PKC on improvements in
maintaining infrastructure like water,
electricity, and gas supplies, as well
as transport routes and pedestrian
access during climate emergencies.
7.2 Contribute to and
support the smallest
green city in Europe
ambitions by
supporting local artists
and makers participate
in climate change
conferences and
events
PKC, 
Cultural
Forum
Existing staff
resource
Local artists and creatives
represented at relevant
events
October
2028
Climate Connect initiative is intended
to involve communities of place and
interest in climate change discussion
and actions across P&K and will reach
out to local artists and makers
Climate Connect Network.
7.3 Promote knowledge of
UN Sustainable
Development Goals
PKC Existing staff
resource
Plan and deliver a social
media awareness
campaign
October
2028
All UNESCO activity is undertaken
with the UN Sustainable Development
Goals in mind. Project '2 Miles
Page 119 of 144

Page 120

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
30 
No. Action Lead Resource Success measure Deadline Progress update
Squared' specifically works to profile
the SGDs by growing and processing
flax and creating a wearable garment
using only resource and space within
2 miles squared of AK Bell Library -
this project addresses numerous of
the SDGs and was designed as a way
of opening up engaging conversations
about the goals and craft as a radical
method of climate action. 
Social media reminders of UN
Sustainable Development Goals via
Climate Change webpages and
Climate Connect
7.4 Support culture and
creative environmental
initiatives in local
communities
CPK Existing staff
resource
Number of active
members
October
2028
The Libraries now have two
Sustainability Officers working to
promote proactive climate positive
activities across all library venues.
7.5 We will promote and
support the principles
of the Theatre Green
Book in production
activity to minimise
environmental impact
of our onstage work
Perth Theatre
and Concert
Hall, 
other
partners
Existing staff
resource
Reduction in carbon
emissions through
production activity
October
2028
Where Perth Theatre and Concert Hall
can continue to have the most
significant impact is investment in our
stage infrastructure, having recently
secured capital funding to upgrade
our largest lighting rig in Perth Concert
Hall’s Gannochy Auditorium in August
2024. This will achieve improved
sustainability, enhance the audience
experience, and further support our
training opportunities for Production
and Technical personnel, both internal
and external. 
Page 120 of 144

Page 121

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
31 
No. Action Lead Resource Success measure Deadline Progress update 
In 2025/26, we will begin fundraising
to replicate this process across our
sound and AV systems, which are
essential to remaining competitive in
the Conference & Events market. 
Smaller, though still functional,
electrical equipment and appliances
which have worn out or slowed down
due to age will continue to be
replaced from our capital reserves.
Appliances which are no longer fit for
business purposes are now being sold
to companies to be refurbished and
subsequently provided to
disadvantaged families, rather than
being sent directly to recycling. 
Our commitment to environmentally
friendly production methods and
touring also extends to the selection
of third-party bookings. We plan our
own and regularly select third-party
tours using greener methods of
transport and will continue to work
with them on logical travel. Where
possible, we will not accept those who
appear to be jumping around the
country rather than programming
venues in logical geographical order to
reduce travel distances. In
Page 121 of 144

Page 122

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
32 
No. Action Lead Resource Success measure Deadline Progress update
production, sets, costumes, and prop
pieces will also be built and sourced
locally to reduce freight costs, with a
focus on using recycled, upcycled and
recyclable materials.
7.6 We will work with
Creative Carbon
Scotland on using arts
activity to promote
active and sustainable
travel opportunities to
visit Perth and Kinross
venues
PKC,
Funded
partners
Existing staff
resource
Consultation and Action
Plan in place
October
2028
All arts events to be planned with
active travel as a feature of the event
promotion.
7.7 Pitlochry Festival
Theatre is aiming to
meet the targets in the
Scottish Government
Climate Change Plan
for non-domestic
buildings
Pitlochry
Festival
Theatre 
Capital
Funding
a) Minimum of 53%
reduction in carbon
emissions for the site
based on electrical and
gas consumption for 2018
Working
towards
2035
Working towards 2035.
b) Minimum of 70% of
heating and cooling
supplied by low-carbon
heating technology
Working
towards
2035
Working towards 2035.
c) Minimum 20%
reduction in heating
demand (in existing
conditioned areas)
Working
towards
2035
Working towards 2035.
7.8 We will work to
become the most
sustainable museum
in Scotland, building
with resources within
The Scottish
Crannog
Centre
Scottish
Government   
and
Museums
Galleries
a) We will source 28
tonnes of reed from Tay
Reedbeds Nature Reserve
to be used for thatching
the museum buildings.             
April 2024 Complete.
Page 122 of 144

Page 123

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
33 
No. Action Lead Resource Success measure Deadline Progress update
walking distance of the
Crannog Centre. We
will stock the café and
shop with local and
Scottish products, and
minimise waste by
moving to a paperless
marketing strategy and
introducing
composting
Scotland
funding
b) 50 tonnes of stone to
come from Taymouth
Castle
April 2024 Complete.
c) Turf cut from local
farms
April 2024 Complete.
d) deliver training
workshops for the public
and craftspeople in dry
stone walling and turf
building  
April 2024 Complete.
7.9 Strathearn Arts will be
an agent of change and
use the arts to inspire
engagement and
action on
environmental
challenges
Strathearn
Arts
Existing staff
resource
Embed environment as a
core pillar of our strategy
October
2028
Our Environmental Policy was signed
off in February 2024. 
Reduced staff numbers have limited
capacity to implement changes so far,
however what can be realistically
delivered is now being looked at.  As
an example, newly installed lightening
has had a positive impact. 
Some of the funding from Creative
Scotland is supporting the planned
environmental focussed festival.  We
are working with local partners to get
their involvement. 
Cultural Pledge 8 - We pledge to support young people to learn, work and grow skills through culture
Page 123 of 144

Page 124

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
34 
No. Action Lead Resource Success measure Deadline Progress update
8.1 Knowledge exchange
sessions with
organisations who
already have
successful
apprenticeship
schemes in place
The Scottish
Crannog
Centre
Not stated One information session in
2023 as part of the cultural
forum to encourage other
organisations to use
apprenticeships
End of
2023
Complete.
8.2 Encourage take-up of
under 22 free bus pass
for young people to
enable free travel
PKC
Education 
Scottish
Government
Number of users of free
bus pass
ongoing PKC - At the instruction of the Public
Transport Transformation Steering
Group we have refreshed and
increased our promotion of public
transport in Perth and Kinross, mainly
bus travel, since February.   
We have previously carried out visits to
Kinross and Breadalbane Community
Campuses where we had staff
available to assist with applications,
replacements and updates to cards to
help pupils get access to free bus
travel and Young Scot benefits.  We
have also previously been available at
local housing office and community
events for all types of NEC, including
U22 travel. 
As it was in a rural location, the
Breadalbane session helped in
addressing inequalities and rural
isolation for young people in this area,
who may have found it difficult to get
to Perth for assistance.  The success of
Page 124 of 144

Page 125

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
35 
No. Action Lead Resource Success measure Deadline Progress update
this session was also down to the
school who did all the groundwork in
terms of sending out a survey to
parents to identify pupils without nec
cards and co-ordinated the year
groups coming to see us on the day. 
At present there are no scheduled
visits, but this could be something for
future consideration. 
Perth Theatre & Concert Hall -
Following our 2023/24 Transforming
Audience Through Art feasibility study
with Creative Carbon Scotland and
complementing our environmental
initiatives, Perth Theatre and Concert
Hall is currently working with
Stagecoach to provide free bus
services for 125 Live! and subsequent
high-profile events such as our annual
pantomime.
8.3 Embedding the voices
and perspectives of
young people in the
heart of Culture Perth
and Kinross’
programming, events,
and strategy
CPK Gannochy
Trust
funding
Number of youth
collective members each
year
October
2028
The Youth Collective is now
established and working to support
Museum and Art Gallery activity. It is a
group of 10 young people who meet
regularly. It is funded by the Gannochy
Trust and most recently the Collective
delivered the first exhibition in the new
temporary exhibition space at Perth Art
Page 125 of 144

Page 126

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
36 
No. Action Lead Resource Success measure Deadline Progress update
Gallery - The Fleapit Theatre - which
ran from June to October 2024.
8.4 Expand our Heritage
Pathways programme
for young people in
Perth and Kinross.
CPK Gannochy
Trust
funding
a) Number of work and
volunteer opportunities for
under 26s.
December
2025
In 23/24 and 24/25 there were 40 work
and volunteer opportunities.
b) Number of training and
awareness sessions
delivered.
December
2025
In 23/24 and 24/25 there were 8
training and awareness sessions either
led or run for the under 26s.
8.5 We will develop our
Learning and
Engagement
programme to support
young people’s
development and use
of arts activity to
develop skills
Perth Theatre
and Concert
Hall
Existing
staff
resource
Work pathways
programme developed
with secondary schools
during 2023.
October
2028
After a departmental restructuring in
2023, Perth Theatre and Concert Hall
Learning & Engagement continue to
deliver and grow our range of regular,
weekly classes in both music and
drama for children and young people.
Participants work alongside
professional theatre makers and
musicians to create their own work in a
safe and enriching space across Perth
Youth Theatre, Perth Youth Musical
Theatre and the Youth Music Initiative. 
We also champion the further benefits
the performing arts bring to people’s
health and wellbeing. For adult
learners, alongside Dance for
Parkinson’s, PKAVS Carers’ Choir and
Vocal Chord, supporting through
singing those with chronic health
conditions in partnership with NHS
Tayside, we will establish a new project
with Alzheimer’s Scotland called Here
& Now in 2025/26. This will enable
Page 126 of 144

Page 127

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
37 
No. Action Lead Resource Success measure Deadline Progress update
those living with the disease and their
carers the opportunity to explore artist
expression through workshops and
replace our previous creative writing
programme for mental health, My
Story, My Stage, delivered in
partnership with Mindspace over the
past three years. 
Beyond our core programme of work,
in 2024/25, we established a creative
hub for emerging writers, actors,
directors, and producers. This has
been designed to nurture our network
and unite often lone workers who
struggle to build a team or find new
opportunities with workshops, talks
and creative sessions. From 2025/26,
we will also collaborate with other
Scottish venues to set up further hubs,
cultivating a wider sense of community
across the sector. 
Then, over the next three years, we are
expanding our Perth Youth Theatre
programme with Perth Youth Theatre
Production, a skills development
initiative offering weekly classes for
15-18-year-olds to learn and build
skills for the workplace, whether a
future career in the arts or other
sectors. Taught by industry
Page 127 of 144

Page 128

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
38 
No. Action Lead Resource Success measure Deadline Progress update
professionals, the classes will cover a
range of disciplines, including
costume, lighting, set design, and
stage management. We will also
create The Collective, a free
programme for young people not in
employment or full-time education.
They will work together to develop
skills in different aspects of the arts
and create a piece of work based on
their experiences in a challenging
world.
8.6 We will build out
initiative to develop
skills in the young
workforce in
production and
technical craft areas
Perth Theatre
and Concert
Hall 
Existing
staff
resource
Develop ongoing
programme building on
success of youth arts
bursaries (funding
dependent)
2023 In 2023/24, Perth Theatre and Concert
Hall restructured our Technical team
to create more entry-level positions for
recent graduates or those who took a
practical path into the industry. This
promotes equality of opportunity and
long-term careers in theatre. Our
experienced team guides project
participants and new members,
facilitating their growth and providing
development opportunities for existing
staff. 
As part of the Scottish Government’s
Developing the Young Workforce
initiative, we also support general skills
and enable alternative talent pipelines
for the sector.
Page 128 of 144

Page 129

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
39 
No. Action Lead Resource Success measure Deadline Progress update
8.7 Pitlochry Festival
Theatre will offer
highquality work
experience and work
placement
opportunities for young
people in Perth and
Kinross in all
departments of the
Theatre
Pitlochry
Festival
Theatre
Existing
resources,
including
PKC and CS
funding
Established relationships
with schools and FE/HE
institutions to work
together to provide
bespoke high-quality
opportunities and work
programmes
October
2028
In 2024, the Theatre hosted 12 work
placement opportunities across the
Theatre departments. The Theatre has
built relationships with local schools
and FE Colleges and formalised the
processes to ensure high quality
experiences.
8.8 Pitlochry Festival
Theatre will continue to
offer creative learning
and performance
opportunities for young
people through
creative engagement
activity and hosting NT
Connections annually
Pitlochry
Festival
Theatre
Existing
resources,
including
PKC and CS
funding
Annual performance
events including NT
Connections Festival
October
2028
In 2024, the Theatre hosted NT
Connections Festival for four youth
theatre companies and will host 6
groups in 2025.  The Theatre runs a
weekly drama club at Pitlochry High
School, two youth dance sessions, and
runs workshops and activities in
schools all of which have performance
opportunities. It also runs an Early
Stages group for 0-5 year olds.
8.9 Blairgowrie Book
Festival engage with
schools via ‘Authors in
Schools’ programme
Bookmark
Festival
Existing
resource
Sustain and develop the
programme to provide a
day of reading, writing,
acting and drawing led by
professionals in various
primary schools in or near
Blairgowrie
October
2028
Each year an ‘Authors in Schools Day’
is organised by one of our committee
members, Jen Geddes.  She chooses
one of the primary schools in or
around Blairgowrie and works out a
day’s activities to include the whole
school.                                                                                    
Workshops of all types are run by our
invited authors - from drama groups, to
storytelling and writing, and music.                                                 
Over the past 12 years, we’ve involved
a great many schools from Kirkmichael
Page 129 of 144

Page 130

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
40 
No. Action Lead Resource Success measure Deadline Progress update
to Coupar Angus. Next year the day will
be spent at St Stephen’s in Blairgowrie.   
Book Trust Scotland helps to fund this
through their Live Literature
programme.                                                                        
Bookmark also awards a prize to
Blairgowrie High School for a short
story written by a senior pupil. This is in
memory of Bookmark’s founder,
Christine Findlay. We fund this
ourselves. 
Cultural Pledge 9 - We pledge to support and develop our small creative and craft businesses.
No. Action Lead Resource Success measure Deadline Progress update
9.1 Develop the UNESCO
brand in Perth and
Kinross by supporting
events and festivals
across the whole area.
PKC Funding
identified
Deliver support to a
number of new and
existing initiatives
October
2028
Launched in November 2024, Perth
Craft News is a way of establishing a
platform to highlight and amplify craft-
based festivals and events, as well as
local businesses and individual
makers.
9.2 Increase awareness of
the maker-spaces in
libraries and The
Famous Grouse Ideas
Centre.
CPK,
PKC
Yes New target of 410 uses of
the makers space in 2023
October
2028
Following review, the maker-spaces in
libraries are being consolidated.
9.3 Create Makers Drop-In
nights in WASPS
Creative Exchange to
WASPS,
PKC
Yes Drop-in nights introduced
in February 2023 and run
for six months
February
to June
2023
Complete.
This activity has allowed for greater
opportunities for makers / creatives
Page 130 of 144

Page 131

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
41 
No. Action Lead Resource Success measure Deadline Progress update
increase awareness of
the building and the
people who work there
and has enabled more people to
engage with the building and make use
of the resources.
9.4 Develop and print a
Creative Perthshire
map to be distributed
across the whole area
Perthshire
Open Studios
with support
from
UNESCO City
of Craft 
Yes Number of maps
distributed
October
2026
This activity to be reviewed (paused for
2025/26).
9.5 Support a
creative/maker to
make new work via a
residency project, then
secure funding for next
year
Birnam Arts Yes a) Applications received
and positive evaluation
from the maker/ creative 
b) Further funding secured 
Complete
by June
2023
Complete.
For our 2023 artist in residence (AiR)
call out, we targeted artists having to
balance their care responsibilities with
their practice. Everyone who applied
fitted the requirement – 16 people
applied who are caring for partners,
parents or young children. We chose
Jessica Ramm (fine art performance,
printmaking, sculpture, multimedia)
because of her strong application, her
work being risk taking, high end, with a
strong sense of excellence and who is
rapidly becoming acclaimed.
Throughout the residency, Jessica
explored working with local rocks,
considering their implication of time,
vibration and layers of experience. Her
proposal was in tune with our
environment curatorial line, engaging
with the local landscape. Jessica lives
locally (within 20 miles of Birnam) and
Page 131 of 144

Page 132

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
42 
No. Action Lead Resource Success measure Deadline Progress update
at the time of the residency was a new
mum with an 8 month old baby. She
was breastfeeding so we bought a
fridge to enable her to express and
store her breastmilk, following
Scottish Government guidelines on
how to support a breastfeeding
mother. Although there is no
expectation of a finished outcome for
our AiR opportunities, Jessica carried
out research and development work
for a sonic art piece which enabled her
to create a finished piece which she
presented at the DUSK Art Festival, 18-
21 June 2023 in Lisbon, Portugal.
Jessica expressed interest in bringing
the ‘rock concert’ to Birnam – and
accepted a solo exhibition at BA from
27 April - 2 June 2024, where she
performed a site-specific scratch ‘rock
concert’ and presented a series of new
screen prints and collages. We
continue to keep in touch with Jessica
and recently connected her with Dr
Louisa Preston from Stirling University
(who exhibited at BA between 19 Oct-
24 Nov 2024) in line with Louisa’s
academic research around zines. In
terms of AiR legacy, we received
funding for two AiRs in 2024 (and two
more again in 2025) via the Creative
Scotland Open Fund.
Page 132 of 144

Page 133

Culture Strategy 2023-28, Mid-Term Review
Culture Pledges and Actions - updates
43 
No. Action Lead Resource Success measure Deadline Progress update
9.6 Perthshire Artisans will
work with UNESCO
City of Craft to fund 3
Masterclasses over a
12-month period for
Perthshire Artisans to
further develop their
business skills, inspire
ambition to develop
new markets and
improve sustainable
practices.
Perthshire
Artisans
Yes Number of attendees October
2026
As of November 2024, UNESCO City of
Craft teamed up with Perthshire
Artistans to produce a sponsored
article in We Are Makers magazine
which is distributed worldwide,
featuring a local glassmaker. We are
also in discussions around supporting
sponsored Perthshire Artisans
memberships for emerging makers. In
October 2024, we launched a
database survey to collect information
on local makers who are interested in
delivering craft-based workshops,
though this was open publicly and not
just within the Perthshire Artisans
membership.
9.7 Raise the profile,
create opportunities,
and build relationships
with local creative and
craft businesses.
PKC/Perth
UNESCO City
of Craft and
Folk Art (CPK)
Existing
staff
resource
and external
funding
where
available
Number of small creative
and craft businesses
engaged in new projects
March
2028
Proposed new action. 
Page 133 of 144

Page 134

Page 134 of 144

Page 135

PERTH AND KINROSS COUNCIL 
Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________  
Committee or Board: Housing & Social Wellbeing Committee 
Date of Meeting: 1 October 2025 
Report Title: Annual Assurance Statement 2024/2025 – Scottish
Housing Regulator 
Report Number: 25/246 
Report Author: Elaine Ritchie - Strategic Lead – Housing &
Communities 
Organisational Lead: Strategic Lead – Housing & Communities
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to comply with the Scottish Housing Regulator's
Regulatory Framework, the Council must approve and submit an Annual
Assurance Statement, giving assurance that it is meeting legislative and
regulatory standards for social housing in Scotland. This report provides a
brief overview of the Framework and appends the Annual Assurance
Statement 2024/25 for approval by Committee. 
1.2 Sections 
1. Purpose
2. Recommendations 
3. Background
4. Annual Assurance Statement Overview
5. Improvement Actions 
6. Evidence to Support Assurance 2024/25
7. Tenant and Service Users Assurance 
8. Self-Assessment 
9. Conclusion 
10. Impact Value Assessment 
11. Appendices 
9
Page 135 of 144

Page 136

2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the requirement to submit an Annual Assurance Statement. 
2.2 Approves the Annual Assurance Statement as detailed in Appendix 2. 
3. Background/Main Issues 
3.1 Context 
3.1.1 All social housing landlords are required to publish an Annual Assurance
Statement in line with guidance within the Scottish Housing Regulator’s (SHR)
published Regulatory Framework. The Framework details the SHR’s
statement on performance of functions, and sets out how they regulate
Registered Social Landlords, as well as housing and homelessness services
delivered by Local Authorities. 
3.1.2 Within the Framework, the SHR carry out their work in the following broad
ways: 
• gathering and publishing data in ways that tenants and other
stakeholders can use
• seeking assurance from landlords and acting where they need to
• undertaking thematic activity and scrutiny on specific areas of work and
performance 
3.1.3 Central to their approach is landlords assuring themselves, their tenants and 
the SHR through landlord self-assurance. 
3.1.4 Every Registered Social Landlord and Local Authority is responsible for
delivering good outcomes and services for their tenants and service users.
The SHR is clear that landlords must be self-aware, analytical, open and
honest about their performance and identify and drive improvement activities. 
3.1.5 When considering whether to engage with landlords, the SHR will initially
consider what they have done to assure themselves that they are meeting
regulatory requirements. In line with this requirement, all landlords must
prepare an Annual Assurance Statement to confirm to their tenants and the
SHR that they are meeting regulatory requirements. 
4. Annual Assurance Statement Overview 
4.1 Since April 2019, there has been a requirement for all Local Authorities and
Registered Social Landlords to submit an Annual Assurance Statement which
must be agreed by the relevant Local Authority Committee. 
Page 136 of 144

Page 137

Statements should confirm the landlord’s level of compliance with the
requirements detailed within the Framework, including: 
• all relevant standards and outcomes in the Scottish Social Housing
Charter
• all relevant legislative duties
• details of any areas of material non-compliance, briefly describing plans
and a timeframe to improve
• confirmation that the relevant Local Authority Committee have seen and
considered appropriate evidence to support the level of assurance 
4.2 A signed and unsigned copy of the Annual Assurance Statement must then
be provided to the SHR, who will then make the unsigned version publicly
available. There is also a requirement for landlords to ensure the Statement is
easily and readily available for tenants. 
4.3 During 2024/25, Perth and Kinross Council’s Housing Service complied with
all but one of the regulatory requirements outlined in Chapter 3 of the Scottish
Housing Regulator’s Framework. This confirms that we: 
• Met all standards and outcomes in the Scottish Social Housing Charter
for tenants, people experiencing homelessness, and others who use our
services.
• Fulfilled our legal obligations relating to housing and homelessness,
equality and human rights, and tenant and resident safety. 
4.4 The only one area of non-compliance identified relates to the management of
our Gypsy/Traveller sites. 
4.5 In November 2024, the Scottish Housing Regulator (SHR) carried out a
serious concern investigation into the Double Dykes and Bobbin Mill
Gypsy/Traveller sites, following complaints from residents and an advocacy
group. The investigation was prompted by concerns around poor
accommodation standards, limited communication and engagement,
particularly due to paused meetings and a lack of strategic consultation, and
broader human rights issues, including fair treatment and cultural sensitivity. 
4.6 The SHR’s findings concluded that Perth & Kinross Council had not met its
obligations under the Scottish Social Housing Charter. This included areas
such as Equalities, Communication, Participation, Repairs and Maintenance,
and standards specific to Gypsy/Traveller sites. Despite the Council
submitting extensive evidence to demonstrate compliance and highlighting
ongoing actions, such as the implementation of a multi-million-pound chalet
replacement programme, the SHR upheld its original findings. 
4.7 To provide assurance and demonstrate progress, the Council is now required
to submit quarterly updates to the SHR under an agreed Engagement Plan.
These updates confirm compliance with the Scottish Government’s minimum
site standards and track progress on the improvement programme. 
Page 137 of 144

Page 138

We continue to submit these updates regularly and remain committed to
meeting all requirements. 
4.8 To date, two quarterly updates have been submitted, and we have received
positive feedback from the SHR on the progress made. The Engagement Plan
will remain in place until the SHR is satisfied that the Council is fully compliant
with the Scottish Social Housing Charter and the Scottish Government’s
minimum standards for Gypsy/Traveller sites. 
5. Improvement Actions 
5.1 To ensure continuous improvement, the housing service has developed an
overarching Action Plan to build on progress, implement targeted
improvements, and maintain ongoing compliance with the Regulatory
Framework. 
5.2 In response to the SHR’s investigation, a separate Gypsy/Traveller Action
Plan was established. This plan directly addresses the issues identified at
Double Dykes and Bobbin Mill and sets out clear, measurable actions to
improve site conditions and ensure full compliance with both the Scottish
Social Housing Charter and the Scottish Government’s minimum standards
for Gypsy/Traveller sites. 
5.3 As a clear demonstration of our commitment to prioritising Gypsy/Traveller
accommodation, we have appointed a dedicated Gypsy/Traveller Liaison
Officer. This role is central to driving forward the Action Plan, strengthening
relationships with residents, and ensuring sustained improvements across all
Gypsy/Traveller sites in Perth and Kinross. 
6. Evidence to Support Assurance 2024/25 
6.1 Alongside our Improvement Action Plan, our management and democratic
structures, are all designed to facilitate effective decision making, and the
proper scrutiny of decisions and their impact, in terms of performance and the
achievement of outcomes. 
6.2 This is supported by a range of planning processes, ensuring we meet the
needs of tenants and service users, and that targets for quality improvements
are set and monitored. Individual Business Management & Improvement
Plans set out detailed actions and outcomes for each Service and include
performance indicators. This is underpinned by the statutory requirement on
local  authorities to produce a Local Housing Strategy and provide regular
progress updates. This sets out our priorities and plans for the delivery of
Scottish Housing Regulator Outcomes. 
6.3 Service performance is reported regularly to the Housing Management Team,
Executive Lead Team and publicly through the Council’s themed Committees
and the Scrutiny Committee. Financial performance is publicly reported
through the Finances and Resources Committee. 
Page 138 of 144

Page 139

6.4 The evidence required by the SHR forms part of the self-assessment process,
which informs in part, the Council’s Annual Governance Statement. Appendix
1 details an overview of information that supports the Annual Assurance
Statement. 
7. Tenant and Service Users Assurance 
7.1 The SHR has indicated that it is the responsibility of Committee to consider
and approve the Annual Assurance Statement. There is no requirement for
this to be approved by tenants or service users. 
7.2 However, we held an interactive hybrid session with the tenants and service
users during in June 2025, where the Housing Management and the Tenant &
Resident Engagement Team presented an overview of the Service’s
performance for 2024/25 to enable tenants to assess the Service’s
performance and provide feedback on potential areas for improvement. This
feedback will be used to support our Annual Landlord Performance Report
and the Annual Assurance Statement. 
7.3 To strengthen our understanding of tenant experience, we commissioned
independent market research firm Knowledge Partnership to carry out a
comprehensive tenant satisfaction survey on our behalf. The survey involved
a mix of face-to-face and telephone interviews with a representative sample of
tenants. 
7.4 Conducted between February 2024 and March 2025, the survey engaged
1,200 tenants and assessed satisfaction levels across a range of national key
indicators set by the Scottish Housing Regulator. 
7.5 The results were largely positive, with 77.3% of tenants indicating a high level
of satisfaction with the overall service provided by Perth & Kinross Council as
their landlord. Although this figure is slightly below the Scottish Council
average of 80.3%, it nonetheless represents a strong endorsement of the
housing service and offers a solid foundation for ongoing improvement. It is
important to note that the variance in satisfaction levels is, in part, attributable
to feedback concerning issues that fall outside the direct remit of the housing
service such as dog fouling, litter, the availability of local amenities and the
visibility of Police Scotland. To address these concerns, we continue to work
collaboratively with other services and community partners, ensuring that
tenant feedback drives meaningful and positive change within local
communities. 
7.6 Combined with our ongoing external scrutiny by tenants, the survey results
offer valuable assurance that our services are meeting the expectations and
needs of those who use them. 
Page 139 of 144

Page 140

8. Self-Assessment 
8.1 To support continuous improvement and external validation of our
performance, the Scottish Housing Network carried out a desktop review of
our Annual Return on the Charter (ARC) prior to its submission to the Scottish
Housing Regulator (SHR). The feedback received was highly positive, and the
findings from this review have been incorporated into the Service’s
overarching Action Plan. 
9. Conclusion 
9.1 Perth & Kinross Council’s Housing Service continues to demonstrate robust
performance across all key areas, consistently delivering high levels of tenant
satisfaction despite the ongoing challenges posed by cost-of-living pressures
and rising demand for affordable housing. This has been achieved while
maintaining one of the most affordable rent levels in Scotland, currently the
fourth lowest among local authorities, underscoring our commitment to
delivering a high-quality, value-for-money service. 
9.2 We remain firmly committed to achieving full compliance across all areas of
service delivery and are actively strengthening our approach to the
management of Gypsy/Traveller sites, with targeted actions and dedicated
resources in place. 
9.3 Throughout the year, the Committee has received a series of comprehensive
reports that provide clear assurance we are not only meeting but, in many
areas, exceeding the standards set by the Scottish Housing Regulator (see
Appendix 1). 
9.4 The Committee is requested to formally approve the Annual Assurance
Statement as presented, confirming that the Housing Service continues to
meet the regulatory requirements set out by the Scottish Housing Regulator
and remains committed to ongoing improvement and compliance. 
10. Impact Value Assessment 
10.1 IVA For Annual Assurance Statement.docx 
11. Appendices 
11.1 Appendix 1: Overview of information that supports the Annual Assurance
Statement. 
11.2 Appendix 2: Annual Assurance Statement. 
Page 140 of 144

Page 141

Detailed below is an overview of information to support the Annual
Assurance
Statement for 2024/25.
• Local Housing Strategy 2022-2027 - the Perth and Kinross Local
Housing Strategy was approved by Committee on 15 March 2023
(Report 23/82 refers) 
Local Housing Strategy - Perth & Kinross Council (pkc.gov.uk) 
• The Strategic Housing Investment Plan at Committee on 29
November 2024 (Report – 23/336 refers) SHIP 24.25. An updated
SHIP is due to be discussed at the same Committee as the Annual
Assurance Statement for approval (Report No25/244) SHIP
2026.27 
• Perth and Kinross Council Annual Performance Report 2024/25
was approved by Scrutiny and Performance Committee on 17
September 2025 (Report -25/230 refers) - Annual Performance
Report 2024.25 
• Housing Revenue Account (HRA) Strategic Financial Plan
Incorporating The 5 Year Capital Investment Programme And Rent
Strategy To 2029/30, Reserves Strategy And Other Housing
Charges For 2025/26 was approved by Committee 22 January
2025 (Report – 25/9 refers) - HRA Strategic Financial Plan 
• Annual Performance Report for tenants – the Council is required to
publicise to tenants, its performance against the 16 national
Scottish Social Housing Charter outcomes. The overall outcome of
this is included within the Annual Performance Report. 
Housing Service performance - Perth & Kinross Council
(pkc.gov.uk) 
• The Councils overall Performance and benchmarking information:
Performance and benchmarking - Perth & Kinross Council
(pkc.gov.uk) 
• The Corporate Plan 2022/2023-2027/2028 conveys the Council's
vision for Perth and Kinross. Importantly it provides strategic
direction for the organisation, informs decision making and
Appendix 1
9
Page 141 of 144

Page 142

facilitates prioritisation of activity and resources. Corporate Plan
Introduction - Perth & Kinross Council (pkc.gov.uk) 
• The Community Plan/Local Outcomes Improvement Plan 2022/32
identifies the high-level strategic objectives the Council is working
towards to meet local needs. 
Community planning - Perth & Kinross Council (pkc.gov.uk) 
• The Council reports on performance against indicators in the Local
Government Benchmarking Framework, this data can be found on
the My Local Council portal which shows how Councils are
performing across a range of council services with comparisons to
other Local Authorities and the national average. 
• We periodically publish our performance online as well as in our
report. We are committed to analysing our performance as a
Housing Service and reporting the results to our tenants. Our aim
is to continually improve the services we provide to local people. 
Housing Service performance - Perth & Kinross Council
(pkc.gov.uk) 
Page 142 of 144

Page 143

Appendix 2 
Our Annual Assurance Statement
We can advise that during 2024/25 Perth and Kinross Housing Service complied with 
all except one regulatory requirement as set out in Chapter 3 of the Scottish Housing 
Regulator's Framework. This confirms that we: 
• achieved all the standards and outcomes in the Scottish Social Housing
Charter for tenants, people who are homeless and others who use our
services. 
• complied with our legal obligations relating to housing and homelessness,
equality and human rights, and tenant and resident safety with the exception
of the management of gypsy/traveller sites. 
We acknowledge this area of non-compliance and continue to engage proactively
with the Scottish Housing Regulator through an established Engagement Plan. As
part of this process, we provide quarterly updates to the Regulator, outlining
progress, challenges, and actions taken to address the identified issues. 
We remain committed to achieving full compliance and are actively working to
improve our approach to the management of Gypsy/Traveller sites. This includes
ongoing internal review, stakeholder engagement, and the development of
appropriate service responses. 
From the various Service performance reports, combined with the management and
democratic structures, which are all designed to provide the proper scrutiny of
performance and the achievement of outcomes, along with the Service’s
Improvement Action Plan, we confirm that we have seen and considered sufficient
evidence to give us the assurance that the Housing Service are meeting the SHR
regulatory requirements. 
To meet our level of assurance we considered appropriate evidence against each of 
the requirements as set out by the Scottish Housing Regulator, and we will continue
to review assurance throughout the course of the year. 
The Annual Assurance Statement 2025 to the Scottish Housing Regulator was 
presented and approved at the meeting of our Housing & Social Wellbeing
Committee on 1 October 2025. 
I sign this statement on behalf of the Housing & Social Wellbeing Committee: 
Housing Convener’s Signature:                                                                       Date: 
9
Page 143 of 144

Page 144

Page 144 of 144