Page 1

Argyll and Bute Council 
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
15 March 2023 
NOTICE OF MEETING 
A meeting of the PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE will be
held BY MICROSOFT TEAMS on WEDNESDAY, 22 MARCH 2023 at 11:30 AM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTE (Pages 3 - 20)  
Planning, Protective Services and Licensing Committee held on 15 February 2023 
4. MR GRAHAM WYLIE: VARIATION OF CONDITION NUMBERS 3, 4, 5 AND 6 AND
REMOVAL OF CONDITIONS 7 AND 8 RELATIVE TO PLANNING PERMISSION
20/01150/PP (ERECTION OF DWELLINGHOUSE). ACCESS ARRANGEMENTS:
RHU LODGE, FERRY ROAD, RHU, HELENSBURGH (REF: 21/02709/PP) (Pages
21 - 68)  
Report by Head of Development and Economic Growth 
5. THE SCOTTISH GOVERNMENT ON BEHALF OF SCOTTISH HYDRO ELECTRIC
TRANSMISSION PLC: CONSTRUCTION OF APPROXIMATELY 13.3 KM OF 275
KV OVERHEAD LINE (OHL) FROM BETWEEN A PROPOSED SUBSTATION AT
CREAG DHUBH TO THE EXISTING SCOTTISH POWER ENERGY NETWORKS
(SPEN) 275 KV OHL THAT RUNS FROM DALMALLY TO INVERARNAN: LAND
SOUTH OF DALMALLY AND EAST OF CLADICH (REF: 22/01298/S37) (Pages 69
- 76)  
Report by Head of Development and Economic Growth 
Public Document Pack

Page 2

Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Jan Brown
Councillor Audrey Forrest Councillor Kieron Green (Chair)
Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Willie Hume
Councillor Mark Irvine Councillor Andrew Kain
Councillor Paul Donald Kennedy Councillor Liz McCabe
Councillor Luna Martin Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 15 FEBRUARY 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Jan Brown
Councillor Audrey Forrest
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Fiona Howard 
Councillor Willie Hume
Councillor Andrew Kain
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: David Logan, Head of Legal & Regulatory Support
Shona Barton Governance Manager
Peter Bain, Development Manager
Sandra Davies, Major Applications Team Leader
Howard Young, Area Team Leader – Helensburgh & Lomond/Bute & Cowal
Arlene Knox, Senior Planning Officer
David Moore, Senior Planning Officer
Stephanie Wade, Senior Planning Officer
Emma Jane, Planning Officer
Norman Shewan, Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Graham Hardie and Mark Irvine. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 18
January 2023 at 11.00 am was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 18
January 2023 at 2.00 pm was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 18
January 2023 at 2.30 pm was approved as a correct record. 
4. ROSNEATH FARMS LTD: SITE FOR THE ERECTION OF DWELLINGHOUSE:
PLOT 7, LAND TO THE REAR OF LOCHEWE AND ARDLANISH,
KILGREGGAN, HELENSBURGH (REF: 21/00349/PPP) 
The Planning Officer spoke to the terms of the report and to supplementary report number
1 which advised of further representations received on 13 February 2023 and the
submission of a supporting statement from the Applicant’s Agent in response to the issues
raised.   
Page 3 Agenda Item 3

Page 4

The proposed site is situated within the minor settlement boundary for Portkil as
designated in the Argyll and Bute Local Development Plan 2015.  Subject to appropriate
safeguarding conditions to secure the appropriate siting and design of a modest
dwellinghouse within the site, the site is considered to represent an appropriate
opportunity for development within the defined Rural Opportunity Area (ROA) consistent
with the relevant provisions of the Development Plan and there are no other material
considerations of sufficient significance to indicate that it would be appropriate to withhold
planning permission having regard to Section 25 of the Act.  Also subject to
commensurate improvements to the existing private access road, it is considered that the
proposal can be served by an appropriate private and public road regime. 
It was recommended that planning permission in principle be approved subject to the
conditions and reasons detailed in the report. 
Decision 
The Committee agreed to grant planning permission in principle subject to the following
conditions and reasons: 
1. PPP - Standard Condition & Notes 1 
Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7 and 8 below
shall be submitted by way of application(s) for Approval of Matters Specified in
Conditions in accordance with the timescales and other limitations in Section 59 of the
Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the
development shall be completed wholly in accordance with the approved details. 
Reason: In accordance with Section 59 of the Town and Country Planning (Scotland)
Act 1997 (as amended).PP - Approved Details & Standard Notes – Non EIA
Development. 
2. PPP - Approved Details & Standard Notes 2 
The development shall be implemented in accordance with the details specified on the
application form dated 17th February 2021, supporting information and, the approved
drawings listed in the table below unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64 of the
Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan PL–657-00 - 18.02.21
Location Plan and
Existing &
Proposed Site
Plan
PL–657-01 - 18.02.21 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
3. Design and Finishes 
Page 4

Page 5

Pursuant to Condition 1 – no development shall commence until plans and particulars
of the site layout, design and external finishes of the development have been
submitted to and approved by the Planning Authority. These details shall incorporate: 
(i) A statement addressing the Action Checklist for developing design contained within
the Argyll and Bute Sustainable Design Guide 2006;
(ii) Taking consideration of the Sustainable Siting and Design Principles set out in the
adopted ‘Argyll and Bute Local Development Plan’ 2015;
(iii) Single or single storey with accommodation in the roof space;
(iv) A house siting, scale and plan form that responds clearly to the natural contours of
the site in order that the proposed built development ‘hunkers down’ into the
prevailing landform and minimises intrusive cut and fill excavation;
(v) Building scale, massing and form that reflects, or sympathetic to the existing
pattern of built development in the immediate vicinity;
(vi) Narrow span volumetric form with symmetrically pitched roof angled between 37
and 42 degrees finished in natural slate or good quality artificial slate, unless an
alternative roof form/design/materiality can be demonstrated as an acceptable
alternative solution to the satisfaction of the planning authority by means of a
comprehensive Design Statement;
(vii) External walls finished in wet dash render, smooth render, natural stone, timber or
a mixture of these finishes unless an alternative material cladding strategy can be
justified by means of a Design Statement to the satisfaction of the planning
authority;
(viii) Window openings with a vertical emphasis unless alternative opening proportions
can be justified as an integral part of a robust design process and justified by
means of a Design Statement to the satisfaction of the planning authority. 
(ix) Existing and proposed sections through the site to demonstrate that the
dwellinghouse will be sited in a manner sympathetic to the wider landscape impact
of the area.
(x) Existing topographical survey and proposed site plan showing ground levels and
finished floor levels (FFLs) relative to an identified fixed datum point located close
to but outwith the application site. 
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997 as amended, and in order to integrate the proposed dwellinghouse with its
surrounds. 
4. Pursuant to Condition 1, no development shall commence until plans and details
showing the following works to the vehicular access, including the existing private
access road from the junction of the proposed new access to the proposed site for a
dwellinghouse to the junction with the B833 public road, and parking regime to serve
the proposed development are submitted to and approved in writing by the Local
Planning Authority: 
(i) Access at connection between the development site and the private access track to
be constructed in accordance with Council’s Roads Standard Detail Drawing SD
08/004a.
(ii) Commensurate improvements to the existing private access road/track to provide a
continuous 5.5 metre adoptable carriageway width between the junction of the
Rosneath road (B833) and the private access to the proposed dwellinghouse,
including a 2 metre wide service strip/grass verge;
Page 5

Page 6

(iii) Parking provision commensurate with the size of dwellinghouse proposed in
accordance with SG LDP TRAN 6 and the Car Parking Standards of the adopted
‘Argyll and Bute Local Development Plan’ 2015. 
Prior to commencement of any works on the application site: 
(i) The commensurate improvements to the private access road from the access point
to the proposed dwellinghouse to the junction with the Rosneath road (B833), as
specified above, shall be completed, and written confirmation that the
improvements have been implemented to an adoptable standard has been issued
by the planning authority in consultation with the Council’s Roads and Infrastructure
Services.
(ii) The approved scheme of works in respect of the junction layout at the connection
between the private site access and the private track shall be formed to at least
type 1 base course standard and the visibility splays shall be cleared of all
obstructions such that nothing shall disrupt visibility from a point 1.05 metres above
the junction at point X to a point 0.6 metres above the public road carriageway at
point Y. The final wearing surface on the improved private access and passing
place shall be completed prior to the development first being occupied and the
visibility splays shall be maintained clear of all obstructions thereafter. 
The approved parking and turning layout shall be implemented in full prior to the
development first being occupied and shall thereafter be maintained clear of
obstruction for the parking and manoeuvring of vehicles. 
Reason: To ensure that the proposed development can be served by an appropriate
private/public road regime and in the interests of road safety in accordance with the
provisions of the Argyll and Bute local Development Plan – 2015 and policies 35, 36,
37 and 39 of the emerging Proposed Argyll and Bute Local Development Plan 2. 
5. No development or other work shall be carried out on the site until a pre-
commencement survey for the presence of protected species has been carried out by
an appropriately qualified person and has been submitted for the written approval of
the Planning Authority in consultation with NatureScot. In circumstances where
species of interest are identified as being present, or at risk from construction works,
the survey shall further provide suggested avoidance and or mitigation measures,
including timing constraints, to address such presence or risk. The development shall
be implemented in accordance with the measures identified in the duly approved
scheme. 
Reason: In order to establish that the circumstances of the site have not changed
significantly between approval and implementation of the development for the purpose
of protecting natural heritage assets in the interest of nature conservation. 
6. PPP – Archaeological Watching Brief 
Pursuant to Condition 1 - no development or ground breaking works shall commence
until a method statement for an archaeological watching brief has been submitted to
and approved by the Planning Authority in consultation with the West of Scotland
Archaeology Service. 
Page 6

Page 7

The method statement shall be prepared by a suitably qualified person and shall
provide for the recording, recovery and reporting of items of interest or finds within the
application site. 
Thereafter the development shall be implemented in accordance with the duly
approved details with the suitably qualified person being afforded access at all
reasonable times during ground disturbance works. 
Reason: In order to protect archaeological resources. 
7. PPP – Full Landscaping Scheme 
Pursuant to Condition 1 – no development shall commence until a scheme of boundary
treatment, surface treatment and landscaping has been submitted to and approved by
the Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
(i) Existing and proposed ground levels in relation to an identified fixed datum;
(ii) A tree survey including a site plan accurately showing the location and species of
existing trees within the site and identifying those to be retained and those to be
felled;
(iii) A proposed scheme for the planting of a substantial tree belt along the south
eastern edge of the application site boundary including an appropriate mix of
deciduous species, sizes and planting densities;
(iv) Location design and materials of proposed walls, fences and gates;
(v) Proposed soft and hard landscaping works including the location, species and size
of every tree/shrub to be planted;
(vi) A programme for the timing, method of implementation, completion and subsequent
on-going maintenance. 
If it is not possible to provide a suitably deep tree buffer zone within the planning
application site boundary then a tree belt shall be provided in the adjacent field
alongside the south eastern boundary of the application site. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity. 
8. PPP – Details of New Private Foul Drainage System 
Pursuant to Condition 1 – no development shall commence until details of the
proposed means of private foul drainage to serve the development have been
submitted to and approved by the Planning Authority. 
Page 7

Page 8

The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development. 
Reason: To ensure that an adequate means of foul drainage is available to serve the
development. 
9. Sustainable Drainage System 
Notwithstanding the provisions of Condition 2, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753 and Sewers for Scotland 4th Edition with post development runoff not
exceeding the greenfield runoff rate.  The requisite surface water drainage shall be
operational prior to the development being brought into use and shall be maintained
as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and
to prevent flooding. 
(Reference: Report by Head of Development and Economic Growth dated 6 February
2023 and supplementary report number 1 dated 14 February 2023, submitted) 
5. MR GRAHAM WYLIE: VARIATION OF CONDITION NUMBERS 3, 4, 5 AND 6
AND REMOVAL OF CONDITIONS 7 AND 8 RELATIVE TO PLANNING
PERMISSION 20/01150/PP (ERECTION OF DWELLINGHOUSE). ACCESS
ARRANGEMENTS: RHU LODGE, FERRY ROAD, RHU, HELENSBURGH (REF:
21/02709/PP) 
The Planning Officer spoke to the terms of supplementary report number 4 and also drew
Members’ attention to the main report of handling and supplementary reports numbered 1,
2 and 3. 
The Committee postponed determination of the application at their meeting on 18 January
2023, pending the submission of further drawings from the Applicant, which were received
on 6 February 2023.  In light of the most recent submission Planning Officers have re-
consulted the Roads Department.  A request was before the Members to continue
consideration of this application to the March PPSL Committee meeting to allow time for
the Roads Officer to respond to this most recent submission and for policy NPF4 to be
applied to the application following its adoption on 13 February 2023. 
Decision 
The Committee agreed to postpone determination of this application to the March meeting
of the PPSL Committee. 
(Reference: Report by Head of Development and Economic Growth dated 8 November
2022, supplementary report number 1 dated 22 November 2022, supplementary report
number 2 dated 10 January 2023, supplementary report number 3 dated 16 January 2023
and supplementary report number 4 dated 8 February 2023, submitted) 
Page 8

Page 9

6. THE SCOTTISH GOVERNMENT ON BEHALF OF ENERGIEKONTOR UK LTD:
ELECTRICITY ACT SECTION 36 CONSULTATION RELEVANT TO ROWAN
WIND FARM: LAND APPROXIMATELY 4.5KM NORTH WEST OF TARBERT,
ARGYLL & BUTE (REF: 22/00385/S36) 
The Senior Planning Officer spoke to the terms of supplementary reports 3 and 4.  This
proposal was originally presented to Committee on 28 September 2022.  The Committee
agreed, on behalf of the Council, as Planning Authority, to object to this proposal for the
reasons detailed in the report of handling.  The Energy Consents Unit was notified
accordingly.  The Energy Consents Unit re-consulted the Planning Authority on 14
December 2022 due to the Revised Draft National Planning Framework 4 (NPF4) being
laid before Parliament.  As NPF4 was subsequently approved by Parliament, and adopted
by Scottish Ministers on 13 February 2023, it was now part of the Development Plan.  As
the Planning Authority’s consultation response of 28 September 2022 was provided prior
to the NPF4 being laid, the Scottish Government would like to give the Planning Authority
the opportunity to provide further comment on NPF4.   This report seeks Members’
agreement on Officers’ further consultation response to the Energy Consents Unit. 
Having considered NPF4 it was recommended that the Council as Planning Authority,
continues to object to this proposal for the revised reasons detailed in supplementary
report number 3, with the inclusion of an additional note attached to these reasons as
detailed in supplementary report number 4, and that the Scottish Government be notified
accordingly.  Members should note that an objection from the Council will instigate the
requirement for a Public Local Inquiry to be held. 
Decision 
Having considered NPF4, the Committee, on behalf of the Council as Planning Authority,
agreed to continue to object to this proposal for the following reasons: 
1. Landscape & Visual Impact (including cumulative) 
The proposed development site lies within the Knapdale Upland Forest Moor Mosaic
Landscape Character Type (LCT) which covers much of the Knapdale area between
West Loch Tarbert and the southern edge of the Knapdale National Scenic Area. This
landscape has a simpler landform in the south-west but is complex and craggy in the
north-east.  This proposal, which comprises very large turbines of up to 200m, would
be sited in a basin which reduces its prominence and intrusion seen from Loch Fyne
and from the settled eastern coastal fringes of this loch. The containment provided by
landform is however diminished in views from the south around West Loch Tarbert
where turbines would be visible in closer proximity and where their scale would be
more appreciated due to greater visual exposure and because they would be seen in
close conjunction with the smaller scale settled loch fringes. The proposal would
significantly affect the character of West Loch Tarbert and views from the A83, the
Islay ferry route, settlement, and recreation routes on the south-eastern shores of the
loch. Proposed aviation lighting would increase the duration of these significant
adverse effects. While it is acknowledged that the extent of these significant adverse
landscape and visual effects is confined to the waters and south-eastern shores of
West Loch Tarbert and the proposal is well screened and/or distant from other
sensitive locations, there is concern about the effects on the tourist routes of the A83
and the Islay ferry which are regionally important within Argyll and Bute. 
Page 9

Page 10

The potential cumulative effects of visible aviation lighting on character and views are
also a concern given the number of recent applications for turbines >150m in Argyll &
Bute requiring such lighting, including application stage: Narachan, Earraghail,
Clachaig Glen and this proposal although we consider that these effects could be
mitigated to an acceptable degree by the adoption of an Aviation Detection Lighting
System which would significantly reduce the duration of visible night-time lighting. 
The principal concern is, however, the cumulative landscape and visual effects likely to
occur with the application-stage Sheirdrim wind farm. If the Sheirdrim proposal is
consented on appeal, it is considered that the addition of the Rowan proposal would
result in significant combined cumulative landscape and visual effects on the West
Loch Tarbert area with a substantial increase in the extent of major adverse effects. It
is considered that the nature of these significant effects on landscape and visual
interests would be of regional importance, affecting not just the tourist routes of A83
and the Islay Ferry but also settlement and recreation routes including views to and
from the nationally important scheduled monument of Dun Skeig. 
In conclusion, it is considered that the cumulative landscape and visual impact of this
proposal with Sheirdrim is unacceptable. 
Having due regard to the above it is concluded that the proposal will have
significant adverse cumulative landscape and visual impacts and is therefore
inconsistent with the provisions of: SG LDP ENV 14 –Landscape; SG 2
Renewable Energy; LDP STRAT 1 – Sustainable Development; LDP DM1 –
Development within the Development Management Zone; LDP 3 – Supporting
the Protection, Conservation and Enhancement of our Environment; Policy LDP
6 – Supporting the Sustainable Growth of Renewables; LDP 9 – Development
Setting, Layout and Design; of the Argyll & Bute Local Development Plan; the
Argyll & Bute Landscape Wind Energy Capacity Study 2017; the Onshore wind
policy statement and Policies 4 (Natural Places) and 11 (Energy) of National
Planning Framework 4 (NPF4) 
2. Aviation 
Argyll & Bute Council will assess development proposals with the aim of preventing
unnecessary dangers to aircraft. Policy requires that development is refused where it
would constrain the present and future operations of existing airports and airfields. 
National Air Traffic Services Safeguarding (NATS) have advised that an unacceptable
technical impact is anticipated, and they object. Glasgow Prestwick Airport advise that
the development raises aviation safety concerns which have an operational impact on
the airport as an air navigation services provider. Until all technical and operational
aviation safety matters are addressed to the satisfaction of Glasgow Prestwick Airport,
and a mitigation agreement is put in place for the life of the wind farm, the airport also
objects to the proposal. 
Local Development Plan Policy is clear that developments that have an adverse
impact on the Safeguarding of Airports should be refused. 
Page 10

Page 11

Having due regard to the above it is concluded that due to the fact that National
Air Traffic Services Safeguarding (NATS) and Glasgow Prestwick Airport have
advised the Energy Consents Unit that they object to the proposal, it will have an
adverse impact on aviation and is therefore inconsistent with the provisions of
SG 2 Renewable Energy, Policy LDP 6 – Supporting the Sustainable Growth of
Renewables and SG LDP TRAN 7 –Safeguarding of Airports of the Argyll & Bute
Local Development Plan, the Onshore Wind Policy Statement and Policy 11
(Energy) of the National Planning Framework 4 in this respect. 
Argyll & Bute Council therefore object to the proposal due to the adverse impact
it would have on Aviation. 
The Energy Consents Unit should please note that: 
 Should Sheirdrim Renewable Energy Development be refused, then Argyll &
Bute Council would no longer object to Rowan wind farm on Landscape &
Visual grounds.  Should Sheirdrim Renewable Energy Development be
approved then the Council’s objection would be maintained as per the
recommendation in this report. 
 If National Air Traffic Services (NATS) and Glasgow Prestwick Airport
withdraw their objections, then Argyll & Bute Council would no longer object
on aviation grounds. Should these objections not be removed, and the
proposal progresses to an Inquiry, Argyll & Bute Council would defer to
National Air Traffic Services and Glasgow Prestwick Airport as the Technical
Experts on this matter. 
(Reference: Supplementary report number 3 by Head of Development and Economic
Growth dated 31 January 2023 and supplementary report number 4 dated 14 February
2023, submitted) 
7. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: TO CONSTRUCT AND
OPERATE A 132/275 KILOVOLT (KV) GIS SUBSTATION AND ASSOCIATED
INFRASTRUCTURE THAT WILL CONNECT THE EXISTING 132 KV OVERHEAD
LINE (OHL) FROM TAYNUILT TO INVERARAY TO A PROPOSED 275 KV OHL
TO DALMALLY: LAND APPROXIMATELY 2.5 KM SOUTH WEST OF CLADICH,
ARGYLL AND BUTE (REF: 22/00782/PP) 
The Senior Planning Officer spoke to the terms of the report.  He drew Members’ attention
to a typographical error in the report of handling and confirmed that the planning
application reference was 22/00782/PP and not 22/00728/PP.  Reference was also made
to a briefing note prepared and circulated by SSEN to Members in respect of the adoption
of National Planning Framework 4 (NPF4) on 13 February 2023 and their network
obligations to this. 
This application is for the erection of an electrical substation and the proposed
development consists of the substation buildings and electrical infrastructure, and
associated works required to accommodate construction, landscaping and access. The
development footprint for the proposed substation site once completed includes the
substation platforms, cut/fill embankments, access road, associated culverts, Sustainable
Urban Drainage System (SUDS) and solar panels. 
Page 11

Page 12

It is considered that the proposal would accord fully with the policies of the development
plan and there are no other material considerations which would indicate otherwise. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
1. The development shall be implemented in accordance with the details specified on the
application form dated 13/04/2022, the Environmental Appraisal (April 2022),
supporting information and, the approved drawings listed in the table below unless the
prior written approval of the planning authority is obtained for an amendment to the
approved details under Section 64 of the Town and Country Planning (Scotland) Act
1997. 
Plan Title. Plan Ref. No. Version Date
Received
Location
Plan
R170_3673_Fig1_1_RedlineBoundarySite_C  14/04/22
Proposed
A819 Site
Access
Design
Location
Plan
LT29_CRDH_0804_0010 B 08/08/22
Proposed
A819 Site
Access
Design
General
Arrangement
Plan
LT29_CRDH_0804-001 B 08/08/22
Proposed
A819 Site
Access
Design
Construction
Details
LT29_CRDH-0804_0013 C 22/08/22
Proposed
Substation
Electrical
Layout
LT29_CRDH_1104_0007 01 08/08/22
Proposed
Substation
Cross
Sections
LT29_CRDH_1104_0008 01 08/08/22
Proposed
Storage
Buildings-
LT29_CRDH_0805_0005 0C 08/08/22
Page 12

Page 13

Elevations 
Proposed
Storage
Buildings-
Floorplans
LT29_CRDH_0805_0006 0A 16/08/22
Proposed
132kV GIS 
Building
Elevations
LT29_CRDH_0805_0003 0D 08/08/22
Proposed
132kV GIS
Building
Floor Plan
and Sections
LT29_CRDH_0805_0001 01 08/08/22
Proposed
257kV GIS
Building
Elevations
LT29_CRDH_0805_0004 0D 08/08/22
Proposed
257kV GIS
Building
Floor Plan
and Sections
LT29_CRDH_0805_0002 01 08/08/22
Location of
septic tank,
borehole
water supply
and SUDS
R170_3673_Fig1_SepticTank_BHWS_SUDS_D  08/08/22
2.5m High
Security
Palisade
Fencing
Details
CE/34/2015 E 08/08/22
2.5m High
Security
Palisade
Fencing
CE/34/2016 E 08/08/22 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. No construction works shall be commenced until a Finalised Construction
Environmental Management Document (CEMD) has been submitted to and approved
in writing by the Planning Authority, in consultation with SEPA, and other appropriate
consultees as appropriate. The development shall then proceed in accordance with the
approved CEMD unless otherwise agreed in writing by the Planning Authority. The
CEMD shall include: 
a) An updated Schedule of Mitigation (SM) highlighting mitigation set out within each
chapter of the Environmental Appraisal (EA), and the conditions of this consent;
b) Processes to control/ action changes from the agreed SM;
Page 13

Page 14

c) Construction Environment Management Plans (CEMPs) for the construction phase
covering: 
(i) Habitat and species protection, including ECoW details, and surveys.
(ii) Landscape and Mitigation Restoration Plan
(iii) Long Term woodland management and compensatory planting plan (refer to
Condition 9)
(iv) Pollution prevention and control;
(v) Dust management, including construction activity and vehicle movements;
(vi) Construction Noise and Vibration (refer to Condition 7)
(vii) Temporary Site lighting;
(viii) Site Waste Management;
(ix) Surface and Ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of
high flow or high rainfall; and a programme of water quality monitoring;
(x) Soil Management and Peat Management (refer to Condition 8)
(xi) Mapping of borrow pits and associated habitats identified for restoration;
(xii) Habitat Management and Restoration Plan;
(xiii) Emergency Response Plans;
(xiv) Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and
(xv) Other relevant environmental management as may be relevant to the
development. 
d) A statement of responsibility to ‘stop the job/activity’ if a breach or potential breach
of mitigation or legislation occurs; and
e) Methods of monitoring, auditing, reporting and the communication of environmental
management on site and with client, Planning Authority and other relevant parties. 
Reason: To ensure protection of surrounding environmental interests and general
amenity. 
3. No development shall commence until a Construction Traffic Management Plan
(CTMP) and Phased Delivery Plan have been prepared and approved in writing by the
Local Authority, in consultation with the Roads Authority, and Transport Scotland as
the trunk roads Authority. The Plan shall details approved access routes, agreed
operational practises (including avoidance of convoy movements, specifying conduct in
use of passing places, identification of turning areas, information of wheel cleansing
facilities, signage to be installed on the A819 warning of construction traffic. reporting
of verge damage) and shall provide for the provision of an appropriate Code of
Practice to drivers of construction and delivery vehicles.  The development shall be
implemented in accordance with the duly approved Traffic Management Plan. 
Reason: To minimise interference with the safety and free flow of the traffic on the
trunk road, to ensure the safety of pedestrians and cycle users using the trunk road
and adjacent facilities and to be consistent with current guidance and best practice. 
4. No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. 
Page 14

Page 15

The scheme shall be prepared by a suitably qualified person and shall provide for the
recording, recovery and reporting of items of interest or finds within the application site. 
Thereafter the development shall be implemented in accordance with the duly
approved details with the suitably qualified person being afforded access at all
reasonable times during ground disturbance works. 
Reason: In order to protect archaeological resources. 
5. Prior to the commencement of development, a strategy for housing incoming
construction workers shall be submitted to and approved in writing by the Planning
Authority.  Thereafter the development shall be carried out in accordance with the
approved details. 
Reason: In order to ensure that any potential adverse impacts on the functioning of the
local housing market and tourist accommodation to the detriment of the interests of the
local community are identified and mitigated in accordance with the requirements of
NPF4, and in particular Policy 11C and Policy 25 Objectives. 
6. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006
or Part 3 of the Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 (as appropriate) which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
7. No development shall commence until a Construction Noise Management Plan
(CNMP) which demonstrates how the developer will ensure the best practicable
measures are implemented in order to reduce the impact of construction noise and
vibration, is submitted to and approved in writing by the Planning Authority. The CNMP
shall include, but is not limited to, the following: 
a) A description of the most significant noise sources in terms of equipment;
processes or phases of construction;
b) The proposed operating hours and the estimated duration of the works for each
phase;
Page 15

Page 16

c) A detailed plan showing the location of noise and vibration sources and noise
sensitive receptors; and
d) A description of noise mitigation methods that will be put in place including the
proposals for community liaison. The best practice found in BS5228 Code of
practice for noise and vibration control on construction and open sites should be
followed. Any divergence requires to be justified. 
Thereafter the development shall progress in accordance with the approved CNMP
with all approved mitigation measures to be in place prior to the commencement of
development, or as otherwise agreed in writing by the Planning Authority. 
Reason: In the interest of safeguarding residential amenity. 
8. No development shall commence until a finalised Peat Management Plan (PMP) has
been submitted to and agreed in writing by the Planning Authority, in consultation with
SEPA. The finalised version shall outline the further measures proposed to reduce
peat disturbance, recalculate the volumes of peat to be disturbed and indicate the
finalised measures for peatland restoration. Thereafter the development shall progress
in accordance with the approved PMP. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reuse
and management of peat. 
9. No development shall commence until a detailed Compensatory Planting Plan (CPP)
and Long Term Forestry Management Plan (LTFMP) are submitted to and approved in
writing by the Planning Authority, in consultation with Scottish Forestry. The approved
CPP and LTFMP shall be implemented in full and in accordance with the approved
timing, unless otherwise agreed in writing by the Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net
loss in woodland related public benefit, in accordance with the Scottish Government's
policy on the Control of Woodland Removal. 
10. The development shall not become operational until vehicle wheel cleansing facilities
have been installed and brought into operation on the site, the design and siting of
which shall be subject to the prior approval of the Local Authority, in consultation with
Transport Scotland as the trunk roads authority. 
Reason: To ensure that material from the site is not deposited on the trunk road to the
detriment of road safety. 
11. Notwithstanding the provisions of Condition 1, the finished ground floor levels of the
buildings of the development shall be elevated to 0.3m above surrounding ground level
unless otherwise agreed in writing by the Planning Authority. 
Reason: In order to ensure appropriate mitigation for flood risk and to ensure an
acceptable relationship between the development and its surroundings. 
12. Watercourse crossings, hereby permitted, shall be designed to at least the capacity of
the existing channel and to the 1 in 200 year plus climate change flow and an
allowance for freeboard, unless otherwise agreed in writing by the Planning Authority.
This includes the replacement of the existing River Array watercourse crossing with a
Page 16

Page 17

new oversized box culvert, or bottomless traditional style bridge to accommodate the 1
in 200 year flood event without constriction. 
Reason: To ensure that new watercourse crossings do not affect the existing flows in
the interests of flood risk. 
13. The development shall not include for the provision of walls, fences or hedges within
2.0 metres of the carriageway of the public road, and any gates shall open inwards,
away from the public road. 
Reason: In the interest of road safety. 
14. Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Operational Services Drawing No SD08/001a; and visibility splays
of 160 metres x 2.4 metres shall be cleared of all obstructions such that nothing shall
disrupt visibility from a point 1.05 metres above the access at point X to a point 0.6
metres above the public road carriageway at point Y. The final wearing surface on the
access shall be completed prior to the development first being brought into use and the
visibility splays shall be maintained clear of all obstructions thereafter. 
Reason: In the interests of road safety. 
15. No external lighting shall be installed on the site other than with the prior written
approval of the planning authority. In that event the location, type and luminance of the
lighting units to be installed shall be specified, and any duly approved lighting shall be
installed in a manner which minimises illumination and glare outwith the boundary of
the application site. The site shall not be illuminated other than in the event of staff
being present on site. 
Reason: In order to avoid unnecessary visual intrusion in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources. 
16. All vehicles transporting construction material to and from the proposed development
shall be sheeted. 
Reason: To ensure that material from the site is not deposited on the trunk road to the
detriment of road safety. 
17. Any blasting for the development, hereby permitted, shall not exceed vibration levels at
the nearest NSR’s of the guideline limits presented in BS 7385-2: 19937 and BS 6472-
2: 20088. 
Reason: In the interests of protecting amenity of neighbouring land use occupiers. 
(Reference: Report by Head of Development and Economic Growth dated 31 January
2023, submitted) 
Page 17

Page 18

8. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: CONSTRUCTION OF
APPROXIMATELY 13.3 KM OF 275KV OVER HEAD LINE (OHL) FROM
BETWEEN A PROPOSED SUBSTATION AT CREAG DHUBH TO THE EXISTING
SCOTTISH POWER ENERGY NETWORKS (SPEN) 275 KV OHL THAT RUNS
FROM DALMALLY TO INVERARNAN: LAND SOUTH OF DALMALLY AND
EAST OF CLADICH (REF: 22/01298/S37) 
The Head of Legal & Regulatory Support spoke to the terms of the report.  The
Committee, at its meeting on 28 September 2022, considered a report of handling in
respect of the above proposal.  The Members agreed, on behalf of the Council, as
Planning Authority, to object to this proposal.  The matter is now subject to a Public Local
Inquiry (PLI).  NPF4 was only available as a consultation draft and not in force at the time
this matter was considered by the PPSL Committee in September 2022.  Scottish
Ministers adopted and published NPF4 on 13 February 2023 meaning that it is now in
force and National Planning Framework 3 and Scottish Planning Policy has been
superseded from that date and time. The PLI will consider this matter in light of NPF4.  As
Members were not in a position to consider NPF4 when forming their decision and, due to
this material change in circumstances, it is considered appropriate to bring this matter
back to Members for their consideration. 
Decision 
The Committee agreed to: 
1. note that NPF4 came into force on 13 February 2023; 
2. note that this is a material change in circumstances since Members made their
decision in September 2022, and it was considered appropriate to bring this matter
back to Members for their consideration; 
3. note that it is considered the application of NPF4, once assessed, may alter the
Council’s prospects for success in the Public Local Inquiry; and 
4. request the Council’s Development Service to provide a report to the next meeting of
the PPSL Committee. 
(Reference: Report by Head of Legal & Regulatory Support dated February 2023,
submitted) 
9. THE SCOTTISH GOVERNMENT ON BEHALF OF DRAX CRUACHAN
EXPANSION LIMITED: ELECTRICITY ACT SECTION 36 CONSULTATION
RELEVANT TO CONSTRUCTION AND OPERATION OF NEW UNDERGROUND
POWER STATION AND ASSOCIATED INFRASTRUCTURE ADJACENT TO
CRUACHAN 1 TO PROVIDE UP TO 600 MEGAWATTS (MW) OF ADDITIONAL
NEW GENERATING CAPACITY: CRUACHAN POWER STATION, LOCHAWE,
DALMALLY (REF: 22/01221/S36) 
The Senior Planning Officer spoke to the terms of the report and to supplementary report
number 1 which proposed a change to the original recommendation in the main report
following receipt of legal advice.  Reference was also made to late submissions to the
Energy Consents Unit by external consultees.  Historic Environment Scotland clarified in a
response dated 1 February 2023 that they had no objections to this proposal and they
were satisfied that the works impacting the Category A Turbine Hall could be addressed
Page 18

Page 19

through the Listed Building Consent Application.  SEPA in a response dated 8 February
2023 confirmed the withdrawal of their holding objection as they were content that
appropriate conditions could address their concerns. 
In Scotland, any proposal to construct, extend, or operate an onshore electricity
generating station, in this case, a pump storage hydro, with a capacity of over 50
megawatts (MW), requires the consent of Scottish Ministers under section 36 of the
Electricity Act. Such applications are processed on behalf of the Scottish Ministers by the
Energy Consents Unit (“ECU”) Scottish Government - Energy Consents. Section 57(2) of
the Town and Country Planning (Scotland) Act 1997 (“TCP(S)A”) also allows the Scottish
Ministers, on granting consent under section 36, to direct that planning permission for that
development shall be deemed to be granted, subject to such conditions (if any) as may be
specified in the direction.  The Council’s role in this process is therefore one of a consultee
along with various other consultation bodies. It is open to the Council to either support or
object to the proposal, and to recommend conditions it would wish to see imposed in the
event that authorisation is given by Scottish Ministers. 
In terms of the Local Development Plan Settlement Strategy, the main site is located
within a combination of, Lorn and the Inner Area Very Sensitive Countryside, North Argyll
Area of Panoramic Quality (APQ), and Glen Etive and Glen Fyne Special Protected Area. 
This report reviews the policy considerations which are applicable to this proposal and the
planning merits of the development, the views of bodies consulted by the Scottish
Government along with other internal consultations undertaken by the Council, and third
party opinion expressed to the Scottish Government. 
It was recommended that Members agree that the Council Objects to the current
proposals, unless the conditions as recommended by the Planning Authority and other
consultees are imposed on any consent. 
Officers also sought Member’s authority to undertake further discussions with the
applicants and The Scottish Ministers to determine whether a planning condition, a
Section 69 agreement, or a Section 75 agreement between parties would most effectively
deliver the Council’s requirement for the necessary Housing Strategy. 
Decision 
The Committee agreed: 
1. on behalf of the Council, to object to the current proposals unless the conditions as
recommended by the Planning Authority and other consultees are imposed on any
consent; and 
2. that Officers undertake further discussions with the applicants and The Scottish
Ministers to determine whether a planning condition, a Section 69 agreement, or a
Section 75 agreement between parties would most effectively deliver the Council’s
requirement for the necessary Housing Strategy 
(Reference: Report by Head of Development and Economic Growth dated 31 January
2023 and supplementary report number 1 dated 14 February 2023, submitted) 
Page 19

Page 20

10. PLANNING PERFORMANCE FRAMEWORK REPORT 2021/2022 
A report containing recent feedback from the Scottish Government in relation to the
Council’s Planning Performance Framework (PPF) was considered. 
Decision 
The Committee agreed: 
1. to note the content of the report; and 
2. to publicise (press, Twitter, Facebook and website release) the positive feedback from
the Scottish Government. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth, dated 2 February 2023, submitted) 
Page 20

Page 21

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 5 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November 2022
and to supplementary reports; No.1 dated 22nd November 2022, No. 2 dated 10th January
2023, No. 3 dated 16th January 2023 and No. 4 dated 8th February 2023 that are currently
before them for consideration in respect of the above application. 
Committee Members postponed the determination of the application in order for the roads
department to respond to the submission of further drawings from the applicants which were
received on the 6th of February 2023. 
Below is a list of all revised and additional drawings that have been provided along with a
commentary (in conjunction with the roads area manager) in response to these drawings. 
19 / 20 / R2 A - Proposed passing place improvements Rev A; This drawing has not been
altered therefore, the previous comments remain. 
19 / 20 / R4 D - Proposed traffic calming improvements Rev D; This drawing has been
altered to include an additional speed hump to the East of the driveway access, bringing the
total of proposed speed humps up to three. In terms of our previous comments on the earlier
drawing, these still stand. The presence of such features does not permit us to determine the
operational speed of the road to less than 20mph. This drawing also notes that the new
passing place is to be 5500mm wide, please see the comment below in regards to the revised
driveway plan in relation to this. 
19 / 20 / R5 D - Combined traffic calming measures Rev D; Comment same as above. 
Page 21 Agenda Item 4

Page 22

19 / 20 / R7 D - Ferry Road proposed improvements Rev D; This drawing has been altered
to include an additional speed hump to the East of the driveway access as well as a note in
regards to the proposed new road construction being type C. Please see comment below in
regards to the re-alignment, new road construction and passing place details required. 
19 / 20 / R9 D - Ferry Road extent of re-surfacing Rev D; This drawing has been altered to
include an additional speed hump to the East of the driveway access as well as a note in
regards to the proposed new road construction being type C. In regards to the note that
indicates new road construction is to be type C - this has not been requested by the roads
department, we would require further information in terms of the proposed extents and details
to support this. Lastly in regards to the comments provided on the precious revision – these
comments have not been addressed and still stand. These comments are; This drawing shows
the extent of the proposed re-surfacing works, the proposed grass verge to sections and
indicates the proposed and existing passing places. As below if the applicant wishes to install
a grass verge then full details of the proposed re-alignment are required (this drawings does
not adequately show this as we require details showing the full extent of re-alignment,
dimensions along the full length, method of illumination for the re-alignment etc.). Furthermore,
the existing and proposed 100m intervisible passing places between the driveway access and
the public road are not adequately detailed. This drawing also fails to detail the second passing
place that is required between the driveway access and the main road – the passing place
indicated at the junction of the public road does not meet standard detail SD 08/003 A as it is
a junction . All passing places must be no more than 100m apart and intervisible for all road
users. All passing places must be constructed in accordance with the minimum requirements
as set out in standard detail SD 08/003 A. This drawing also notes the new passing place is
to be 5500mm wide - please see the comment below in regards to the revised driveway plan
in relation to this.
19 / 20 / R10 B - Driveway plan Rev B; This drawing has been altered to address our previous
comments in regards to the 2.4m visibility set back and the location of the water prevention
measures. These alterations successfully address these comments and I can confirm the
visibility splays and method of preventing water from flowing onto the carriageway are
acceptable. However, this drawing does not address other comments from the earlier revision.
These outstanding comments are; this drawing fails to detail the full extent of the proposed
road re-alignment required to install the grass verge along the boundary wall. If the applicant
wishes to install a grass verge then details of the full roads re-alignment must be included.
These details should include illumination of the carriageway (i.e. bollards). Lastly this revised
drawing now includes a 3.5m dimension across the carriageway East of the application site.
As this location is bounded by a high stone wall to the North this dimension would not be
acceptable or in accordance with roads guidance or original condition; this dimension would
need to be a minimum of 3.7m where bounded by a wall.
22034_006 B - ECS drawing Rev B; This drawing has been updated to show the correct
visibility splay set back. In addition to this the drawing has also been altered to show a 3.5m
dimension to the carriageway to the East of the application site in lieu of the 4m dimension
which was previously noted – as above; as this location is bounded by a high stone wall to the
North this dimension would not be acceptable or in accordance with roads guidance or original
condition; this dimension would need to be a minimum of 3.7m where bounded by a wall.
Furthermore, the passing place detail as shown has been updated to reflect SD 08/003 A. As
Page 22

Page 23

per our comments on the previous revision; The detail showing the 100m intervisible passing
place is incorrect as the suggested passing place at the access to the Rosslea is not in line
with standard detail SD 08/003 A – this suggested passing place is also not considered to be
intervisible for all road users as those exiting the Rosslea will not be able to see traffic from
the right. This drawing also indicates localised widening of 7m at the access to the adjacent
property however, this is not adequately detailed as no lengths of the widening are stipulated.
Lastly this drawing fails to demonstrate the requirement for 100m intervisible passing places
between the driveway access and the public road.
In addition to the above drawings two additional drawings have been provided. These are;
19/20/R11 – Passing Place (A814 Junction); This drawing indicates a 4.5m wide x 10m long
box to indicate an existing ‘passing place’ at the A814 junction. The roads officer has
commented on this drawing and has noted that this is a junction with the public road and is
not a passing place. All passing places should be detailed as per standard detail SD 08/003
A and be intervisible. The minimum width of a passing place is 5.5m and not the 4.5m as
detailed. 
19/20/R12 – Passing Place (Hotel Split); This drawing indicates a 5.5m wide x 10m long box
to indicate an existing ‘passing place’ at the junction of the hotel access. The roads officer has
commented on this drawing and has noted that this is an informal junction with the hotel access
and is not a passing place. All passing places should be detailed as per the standard detail
SD 08/003 A and be intervisible. The 5.5m dimension as detailed should not protrude into the
junction of the hotel access. This passing place should not restrict the junction of the hotel.
Furthermore, this drawing details the existing road width to the West of the hotel access as
2.75m – this is not in line with the required minimum width of 3.5m where not restricted by
walls.
In addition to the revised set of drawings the applicants have proposed three new roads
conditions to substitute the current roads conditions. In terms of the suggested substitute
conditions these would not be acceptable as the drawings submitted and referred to within
these conditions are not in line with roads guidance for the reasons detailed above. Roads
have also commented; in the interest of road safety, Roads will not accept less than the
requirements previously conditioned within the report of handling before Members. This report
of handling also details within appendix A the reasons why the roads conditions should remain
unchanged and why certain conditions should be varied. 
Further to this; subsequent to the last continuation please note that NPF 4 has been adopted.
Therefore, it is necessary to apply the relevant policies of NPF 4 to the development proposed.
National Planning Framework 4 (NPF4) is the national spatial strategy for Scotland. It sets out
spatial principles, regional priorities, national developments and national planning policy. It
replaces NPF3 and Scottish Planning Policy. There are a range of polices within NPF4 that
cover all developments, however, please note that the principle of development has been
established under the previous consent (ref: 20/01150/PP). As such this application solely
relates to; the variation / omission of roads conditions relative to planning permission
20/01150/PP and as such we have only addressed the polices of NPF 4 relating to this aspect.
In this instance the relevant key policy would be policy 13(G); Sustainable Transport which
notes; where it has been demonstrated that existing infrastructure does not have the capacity
Page 23

Page 24

to accommodate a development without adverse impacts on safety or unacceptable impacts
on operational performance, the cost of the mitigation measures required to ensure the
continued safe and effective operation of the network should be met by the developer. This
policy is strongly aligned with current LDP polices LDP 11 and SG LDP TRAN 4. Based on
this NPF 4 supports the current policy assessment and as such the current recommendation
stands. 
2. RECOMMENDATION   
The additional revised drawings submitted by the applicant have been considered and
commented on but do not alter the recommendation contained in the main Report of
Handling dated 8th November 2022; namely, that the application be granted subject to the
conditions, reasons and informative notes contained therein. 
Author of Report: Emma Jane     Date: 14th March 2023 
Reviewing Officer: Howard Young     Date: 14th March 2023 
Fergus Murray  
Head of Development and Economic Growth 
Page 24

Page 25

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 4 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November 2022
and to supplementary reports; No.1 dated 22nd November 2022, No. 2 dated 10th January
2023 and No. 3 dated 16th January 2023 that are currently before them for consideration in
respect of the above application. 
Committee members postponed the determination of the application pending the submission
of further drawings which where received on the 6th of February 2023. In light of the most
recent submission we have re-consulted the roads department. In order for the roads
department to respond to this submission we would seek to again postpone the determination
of this application to the next committee meeting in March. 
Further to this; subsequent to the last continuation please note that the determination of this
application will be made after NPF 4 has been adopted. Therefore, it is necessary to apply
policy NPF 4 to the next supplementary report. 
2. RECOMMENDATION 
Recommend that determination of the application be postponed to the March meeting
of PPSL.   
Author of Report: Emma Jane     Date: 8th February 2023 
Reviewing Officer: Peter Bain     Date: 8th February 2023 
Fergus Murray  
Head of Development and Economic Growth 
Page 25

Page 26

This page is intentionally left blank

Page 27

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 3 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November 2022
and to supplementary reports; No.1 dated 22nd November 2022 and No. 2 dated 10th January
2023 that are currently before them for consideration in respect of the above application. 
Committee members postponed the determination of the application pending a site visit, which
took place on the 12th of January 2023. This supplementary report has been provided with
regards to additional revised drawings received from the applicant on the 10th of January 2023. 
Below is a list of all revised drawings that have been provided and also provides a commentary
(in conjunction with the roads area manager) on these drawings. 
19 / 20 / R2 A - Proposed passing place improvements Rev A; This drawing illustrates the
location of the proposed passing place it does not illustrate or provide any further details. 
19 / 20 / R4 C - Proposed traffic calming improvements Rev C; This drawing indicates the
location of two proposed speed humps as well as noting that the new passing place is to be
5500mm wide (please see the comment below in regards to the revised driveway plan in
relation to this). In terms of the existing and proposed speed humps, these are noted, however,
the presence of such features does not permit us to determine the operational speed of the
road to less than 20mph.
19 / 20 / R5 C - Combined traffic calming measures Rev C; This drawing shows the existing
and proposed speed humps – while these are noted it does not alter the minimum accepted
speed limit of 20mph. This drawing also notes the new passing place is to be 5500mm wide.
Please see the comment below in regards to the revised driveway plan which flags up the
specific issues with this proposed passing place.  
Page 27

Page 28

19 / 20 / R7 C - Ferry Road proposed improvements Rev C; This drawing shows the extent
of the proposed improvement works and also notes the new passing place is to be 5500mm
wide - please see the comment below in regards to the revised driveway plan in relation to the
proposed passing place. This drawing also indicates the proposed grass verge as well as the
existing and proposed passing places – please see comment below in regards to the re-
alignment and passing place details required. 
19 / 20 / R9 C - Ferry Road extent of re-surfacing Rev C; This drawing shows the extent of
the proposed re-surfacing works, the proposed grass verge to sections and indicates the
proposed and existing passing places. As below if the applicant wishes to install a grass verge
then full details of the proposed re-alignment are required (this drawings does not adequately
show this as we require details showing the full extent of re-alignment, dimensions along the
full length, method of illumination for the re-alignment etc.). Furthermore, the existing and
proposed 100m intervisible passing places between the driveway access and the public road
are not adequately detailed. This drawing also fails to detail the second passing place that is
required between the driveway access and the main road – the passing place indicated at the
junction of the public road does not meet standard detail SD 08/003 A as it is a junction . All
passing places must be no more than 100m apart and intervisible for all road users. All passing
places must be constructed in accordance with the minimum requirements as set out in
standard detail SD 08/003 A. This drawing also notes the new passing place is to be 5500mm
wide - please see the comment below in regards to the revised driveway plan in relation to
this.
19 / 20 / R10 A - Driveway plan Rev A; This drawing shows the proposed driveway access
and proposed passing place at the driveway access – this drawing fails to detail the full extent
of the proposed road re-alignment required to install the grass verge along the boundary wall.
If the applicant wishes to install a grass verge then details of the full roads re-alignment must
be included. These details should include illumination of the carriageway (i.e. bollards).
Furthermore the visibility splay should be 2.4m back from the edge of the carriageway – this
drawing shows the splay set back 2m. Lastly, if the applicant wishes to install a grass verge
then the method of preventing water from flowing onto the carriageway should be within the
property boundary and not at the edge of the proposed verge as this drawing illustrates. 
22034_006 A - ECS drawing Rev A; This drawing shows the proposed access alterations
including visibility splays and alterations to the existing boundary wall. This drawing also
shows the two new speed humps and also indicates the 100m intervisible passing place
between the Rosslea access and the new passing place at the driveway access. Road widths
are also indicated on this drawing. The detail showing the 100m intervisible passing place is
incorrect as the suggested passing place at the access to the Rosslea is not in line with
standard detail SD 08/003 A – this suggested passing place is also not considered to be
invervisible for all road users as those exiting the Rosslea will not be able to see traffic from
the right. This drawing also indicates localised widening of 7m at the access to the adjacent
property however, this is not adequately detailed as no lengths of the widening are stipulated.
Lastly this drawing fails to demonstrate the requirement for 100m intervisible passing places
between the driveway access and the public road.
2. RECOMMENDATION   
Page 28

Page 29

The additional revised drawings submitted by the applicant have been considered and
commented on but do not alter the recommendation contained in the main Report of
Handling dated 8th November 2022; namely, that the application be granted subject to the
conditions, reasons and informative notes contained therein. 
Author of Report: Emma Jane     Date: 16th January 2023 
Reviewing Officer: Howard Young     Date: 16th January 2023 
Fergus Murray  
Head of Development and Economic Growth 
Page 29

Page 30

This page is intentionally left blank

Page 31

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 2 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November 2022
and to supplementary report No.1 dated 22nd November 2022 that is currently before them for
consideration in respect of the above application. 
This supplementary report has been provided with regards to additional correspondence
received by the applicant on the 14th of December 2022 and also in response to the applicant’s
comments received on the 23rd of November in response to supplementary report No.1. 
Firstly, with regards to the additional correspondence received on the 14th of December for
which the main points 1 & 2 have been copied in (in bold) below;
1. The roads officer twice stated that the minimum width for fire engine access is 3.5
metres. This is misinformation. The required width for fire engine access widths at
“pinch points” is 2.75 metres. In the context of Ferry road as with many other private
accesses this can be critical and the PPSL members have been misguided here.
In respect of the above Stuart Watson the Assistant Network and Standards Manager has
noted; Designing Streets (extract below) makes allowance for a carriageway width to be
reduced to 2.75m over short distances, this is not intended to cover the full length of a road. 
The minimum width is stated as 3.7m and any reduction from this has to be agreed by the Fire
Safety Officer.  
“Emergency vehicles - The requirements for emergency vehicles are generally dictated by the
fire service requirements. All development proposals should be discussed with the relevant
Fire Authorities. 
Page 31

Page 32

The Association of Chief Fire Officers has expanded upon and clarified these requirements as
follows: 
• A 3.7 m carriageway (kerb to kerb) is required for operating space at the scene of a fire.
Simply to reach a fire, the access route could be reduced to 2.75 m over short distances,
provided the pump appliance can get to within 45 m of all points within a dwelling. 
• If an authority or developer wishes to reduce the running carriageway width to below 3.7 m,
they should consult the local Fire Safety Officer.”
In addition to the above, the National Roads Development guide, under section 3.1.9 (d) Fire
Fighting, states:
“Notwithstanding the recommended road widths in these guidelines, all roads should
accommodate access and operation of fire tenders. The width of roads and reinforced
emergency vehicle paths and their proximity to buildings is detailed in Part E of the Building
Standards (Scotland) Regulations. This document specifies a minimum width of 3.7 metres
adjacent to low rise dwellings to facilitate the use of pumping appliances (this width is
increased to 4.5 metres to permit the use of heavy rescue and firefighting equipment where
buildings are 9 metres or more in height). It should be noted that a basic vehicle path of
3.5 metres width (2.75 metres at pinch points) is appropriate for access but not operation
of the fire tender. ”
2. It was also stated at the meeting that discussions with the roads officer and the
applicant had reached a stage where there may be no point in further discussion. Again
misinformation. Apart from an initial discussion with the roads officer in July / August
2020 there have been no discussions or site meeting between the roads officer and the
applicant to date. I asked the roads officer in November 2020 for a meeting which was
declined. Over the last two years despite many attempts to engage with the roads
officer there has been no meaningful assistance from the officer.
In respect of the above Stuart Watson the Assistant Network and Standards Manager has
noted; Road Officers have not refused to meet - only that there was no merit in meeting before
an acceptable submission had been received. 
Secondly, with regards to the applicant’s comments received on the 23rd of November 2022
in respect of supplementary report No.1 the following is noted in conjunction with the roads
area manager; 
The applicant has noted in regards to road width; Details have been provided to confirm that
the full length of the private road between the A 814 and the development site would achieve
a 3.5 metre width. Also I have submitted confirmation that at the location where the existing
road width requires to be increased, the frontages have given their permission. 
In terms of the above comment from the applicant it is noted that drawings detailing new/
widened sections of carriageway ‘make-up’, in accordance with standard detail section
requirements available with SD 08/003 Rev A have not been provided within the drawing
package. Furthermore, where the existing carriageway is to be retained, no details have been
Page 32

Page 33

provided as to the method of ‘proving’ the existing formation is suitable for retention in
accordance with the aforementioned standard section detail.
The applicant also notes in regards to passing places; a site visit would confirm that the area
of the existing passing places exceeds the width and length of a standard passing place.
Although the geometry of these passing places differs from standard detail SD 08/003A they
provide the same ability to pass easily and safely and have done so for many years. This is
where consideration should be given to the fact that Ferry Road is within Rhu Conservation
Area and as such any improvements should be both proportionate and commensurate with
any current access issues and take into account the location of the site. Any required
improvements should therefore be the minimum necessary to satisfy any identified roads
issues. 
In terms of the above comment from the applicant it is confirmed that the geometry of passing
places has been considered within the geometry detailed within SD 08/003 Rev A. Therefore,
to ensure consistency throughout the area, passing place geometry shall be constructed in
accordance with SD 08/003 Rev A. Where this is not apparent within the drawing package
provided, the condition has been applied. Whilst consideration should be applied towards the
Conservation Area status, so to should it be applied to the road safety of all road users.
Furthermore, the applicant has noted the following in regards to the proposed passing place
at the driveway access and proposals to install a grass verge; I confirm that the proposal to
introduce a new grass verge has been proposed from the submission of the application which
was validated 16th February 2022. The supporting drawings were included. To date no
construction details have been requested, however, prior to any works starting on site this
detail would be submitted for approval. It should be noted that the angle the roads officer refers
to as being “too acute” is 50% less acute than the junction of Ferry road and the main A814.
The proposed passing place final design to be agreed prior to any works starting on site. 
In response to the above the roads officer has noted that until such time that drawings/ details
have been provided/ approved by Roads the condition previously set out shall apply.
Lastly the applicants have noted in regards to speed limits; As previously advised the existing
traffic calming measures (speed ramps) plus the proposal of an additional passing place and
further traffic calming measures ensures that the traffic speeds are below 20mph. It should
not be forgotten that very few vehicles travel along this route, however, these combined traffic
calming measures will maintain slow traffic speeds.
In regards to the above, from a position of road safety, the road has been measured against
the lowest regulatory speed of 20mph. With due consideration for the hierarchy of road users,
which places pedestrians over vehicles, in addition to there being no footway in this location,
the assessment speed of 20mph was considered correct from a position of road safety to all
road users.
2. RECOMMENDATION   
The additional comments from the applicant have been mentioned for completeness but do
not alter the recommendation contained in the main Report of Handling dated 8th November
Page 33

Page 34

2022; namely, that the application be granted subject to the conditions, reasons and
informative notes contained therein. 
Author of Report: Emma Jane     Date: 10th January 2023 
Reviewing Officer: Howard Young     Date: 10th January 2023 
Fergus Murray  
Head of Development and Economic Growth 
Page 34

Page 35

Argyll and Bute Council 
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle 
_________________________________________________________________________ 
Reference No: 21/02709/PP 
Planning Hierarchy: Local Development 
Applicant: Mr Graham Wylie 
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 
relative to planning permission 20/01150/PP (Erection of dwellinghouse). Access 
arrangements 
Site Address: Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll and Bute, G84 8NF 
________________________________________________________________________  
SUPPLEMENTARY REPORT NO. 1 
1. INTRODUCTION   
The attention of Members is drawn to the main Report of Handling dated 8th November
2022 that is currently before them for consideration in respect of the above application. 
This supplementary report has been provided with regards to proposed drawing reference
19/20/10 as an updated drawing (ref: 19/20/10 REV A) below, has been supplied by the
applicant. The roads officer has provided further comment on this drawing and has noted; 
Whilst the details as shown within this drawing noting the 4.5m wide driveway for the first 10m,
the radius and the kerb with water check are correct, it is noted that they have been shown in
the incorrect location as these should be measured back from the boundary wall and not from
a point beyond the boundary wall therefore, the details contained within this drawing are not
acceptable. 
Page 35

Page 36

Further to this, the applicant has provided further information within an email to Members
commenting on the detail within the published report of handling. Most of the matters noted
have been covered in detail within the report of handling and appendix A. However please
note the following additional comments;  
In Relation to note 1; The requirement to provide a 3.5 metre wide adopted road between
the A814 and the entrance dwelling (sic) is unnecessary, and most of Ferry Road is already
more than 3.5 metres wide and the submitted plans show that a 3.5 metre wide road can be
provided along the whole length of the road by simply surfacing a small gully approximately
60 metres long, on the north side of the road, immediately after the split. 
Officer comment; While is it noted that that proposed drawings contain a note that the
carriageway will be 3.5m wide we do not have specific details of this to show that the
proposals accord with the standard details. It is also noted that the road is within shared
ownership hence why condition 3(a) should remain to ensure this is implemented. 
In relation to note 2; With respect to the provision of passing places, there are two
intervisible passing places already in existence, within 100 metres of each other, and these
have operated safely for many years.  At the access to the approved new dwelling a third
passing place will be introduced.
Officer comment; Again while this has been noted on the proposed drawings, there has been
no details provided to show that the existing passing places accord with standard detail SD
08/003 A, hence why condition 3(b) should remain to ensure this is implemented as per the
standard detail. 
In relation to note 3; The Road’s Officer’s additional concern, the absence of a formal turning
head, cannot be introduced now.  The current application seeks only the variation (or
Page 36

Page 37

removal) of conditions that were attached to the previous grant of planning permission, and
this did not include any requirement in respect of the turning head, which in any event is
already used by the Council refuse lorry, and which has proved to be more than adequate
for many years.
Officers comment; In regards to the lack of formal turning head, this has been raised as a
concern that supported the need for roads improvements. There is no planning condition
being imposed that requires this. 
In terms of the proposed passing place at the driveway access and proposals to install a
grass verge, it is noted that the visibility splays as detailed within revised drawing 9/20/10
REV A show the splays taken from a point beyond the boundary / edge of existing
carriageway. There is no existing verge, if the applicant wishes to realign the road to install a
verge then we would need specific details on this, in terms of road construction.
Furthermore, this would no longer solely be assessed as a passing place but as a road
realignment and therefore, the details within this drawing are not acceptable as the angle is
too acute hence the requirement for a condition. 
Lastly in response to the comments in regards to speed limits, the roads officer has noted;
Ferry road is a private road and therefore has no enforceable speed limit, it is commonly
accepted that the default speed limit should be 30mph on private roads. As a local authority
we cannot imply a speed limit of less than 20mph therefore, in the absence of accurate
speed surveys we have deemed a 20mph visibility splay is acceptable, this is detailed as
part of the planning conditions. 
2. RECOMMENDATION   
This revised drawing and the additional comments from the applicant have been mentioned
for completeness but do not alter the recommendation contained in the main Report of
Handling dated 8th November 2022; namely, that the application be granted subject to the
conditions, reasons and informative notes contained therein. 
Author of Report: Emma Jane     Date: 22nd November 2022 
Reviewing Officer: Howard Young     Date: 22nd November 2022 
Fergus Murray  
Head of Development and Economic Growth 
Page 37

Page 38

This page is intentionally left blank

Page 39

Argyll and Bute Council
Development & Economic Growth   
Committee Planning Application Report and Report of Handling as required by
Schedule 2 of the Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 relative to applications for Planning Permission or
Planning Permission in Principle 
Reference No:  21/02709/PP
Planning Hierarchy: Local
Applicant: Mr Graham Wylie
Proposal: Variation of condition numbers 3, 4, 5 and 6 and removal of
conditions 7 and 8 relative to planning permission 20/01150/PP
(Erection of dwellinghouse). Access arrangements
Site Address:  Rhu Lodge, Ferry Road, Rhu, Helensburgh, Argyll And Bute, G84
8NF    
DECISION ROUTE 
Local Government Scotland Act 1973 
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
 Variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP (Erection of
dwellinghouse). Access arrangements 
(ii) Other specified operations
 None 
(B) RECOMMENDATION: 
Planning permission be approved subject to conditions recommended herein. 
(C) CONSULTATIONS:   
Rhu and Shandon Community Council - 07.03.2022 – Object 
Rhu and Shandon Community Council have objected on the basis that the
proposed roads alterations will harm the character of the conservation area and
they would like to see the road remain as is. 
Roads Helensburgh And Lomond - 04.03.2022 – Object 
Roads Helensburgh and Lomond have objected to the proposals to vary/omit the
roads conditions relative to planning permission 20/01150/PP due to the current
issues with the existing access road, as follows; Existing carriageway width is less
than the acceptable carriageway width of 3.5m for emergency services vehicles, No
intervisible Passing Places & No formal turning head In accordance with: 
Page 39

Page 40

SG LDP TRAN 4. They further note that; Private Access shall be constructed to
incorporate minimum standards to function safely and effectively as set out in the
Council’s Road Development Guide, in particular in relation to adequate visibility
splays, access gradients, geometry, passing places, boundary definition, turning
capacities, integrated provision for waste management and recycling. Based on this
roads have noted that conditions 3, 5, 6, 7 & 8 relative to planning permission
20/01150/PP shall remain unchanged and condition 4 should be revised to suit the
roads consultation original response relative to planning application 20/01150/PP
being a minimum visibility splay of 2.4 x 25 x1.05 metres and not the 2.4 x 42 x1.05
metres as per the decision notice for 20/01150/PP. 
(D) HISTORY:   
02/00728/DET
Alterations to dwellinghouse
11.06.2002 
15/00085/PP
Erection of sunroom extension
02.04.2015 
16/00225/PP
Erection of dwellinghouse
23.03.2016 
17/00194/PP
Erection of detached garage
13.03.2017 
20/01150/PP
Erection of dwellinghouse
18.11.2020 
(E) PUBLICITY:   
Advert Type: Listed Building/Conservation Advert              Expiry Date: 24.03.2022 
(F) REPRESENTATIONS:   
i) Representations received from: 
Objection 
1. Brian Fleming Abergare House Rhu   10.03.2022
Page 40

Page 41

2. Ruth Chappell Fleming Abergare House Rhu   10.03.2022
3. Tim Lamb Rhu Cottage Ferry Road Rhu Helensburgh 10.03.2022
4. Jim Duncan Shoreacres Artarman Road Rhu Helensburgh Argyll And Bute
10.03.2022 
Support 
1. Colin Jackson Tanglewood Cumberland Road Rhu Helensburgh
02.03.2022
2. C A Cook Clanard Gareloch Road Rhu Helensburgh 02.03.2022
3. Jane Weir Victoria Cottage Hall Road Rhu Helensburgh 02.03.2022
4. Juliet Baines 1 Rhu Ellen Cottage Gareloch Road Rhu Helensburgh
02.03.2022
5. K Wallace 9 Guthrie Place Rhu Helensburgh Argyll And Bute 02.03.2022
6. Ann McKendrick Lagarie Torwoodhill Road Rhu  02.03.2022
7. Brian Murray 7 Church Road Rhu   02.03.2022
8. J Cairns 3 County Cottage Rhu   02.03.2022
9. R J Sawkins 66 East Clyde Street Helensburgh Argyll And Bute 
03.03.2022
10. Danielle Paterson Rocklea Garelochhead Helensburgh Argyll And Bute
22.02.2022
11. Michelle Cameron 17 Nelson Place Helensburgh Argyll And Bute G84 9ES
23.02.2022
12. Kathleen McGinley Ferry Coach House Ferry Road Rhu Helensburgh
24.02.2022
13. John MacBeath Tigh Na Mara Ferry Road Rhu Helensburgh 22.02.2022
14. Maureen Kinnear Rosslea West Ferry Road Rhu Helensburgh 28.02.2022
15. Lynn Nicolson Rhu Lodge Ferry Road Rhu Helensburgh 03.03.2022
16. John McMeeking Ramah Rhu Point  Ferry Road Rhu Argyll And Bute G84
8NF 21.02.2022
17. Roderic Taylor Garedale Manse Brae Rhu Helensburgh Argyll And Bute
23.02.2022
18. Emma Dodds 100 West Clyde Street Helensburgh Argyll And Bute G84
8BE 25.02.2022
19. Becky Morgan 100 West Clyde Street Helensburgh Argyll And Bute G84
8BE 25.02.2022
20. William Petrie Ground Floor Flat Craigard Church Road Rhu Helensburgh
Argyll And Bute 
21. Elizabeth Law 12 Cameron Drive Tullichewan Alexandria G83 0JT
28.02.2022
22. Paul Cairns 3 County Cottage Gareloch Road Rhu Helensburgh
03.03.2022
23. Jon Reid 10 Cumberland Terrace Rhu   03.03.2022
24. Peter Bogden 6 Rhu House Gareloch Road Rhu Helensburgh 03.03.2022
25. Fiona McNair 1 Glebefield Road Rhu Helensburgh Argyll And Bute
03.03.2022
26. Elizabeth Macdonald 4 Braehead Place Rhu Helensburgh Argyll And Bute
03.03.2022
27. Iain Coats 26 Redclyffe Gardens Helensburgh Argyll And Bute G84 9JJ
03.03.2022
28. Jo McKenzie 22 Baird Avenue Helensburgh Argyll And Bute G84 8DW
03.03.2022
29. Andrew Shearar 10 Havelock Street Helensburgh Argyll And Bute G84 7HB
03.03.2022
Page 41

Page 42

30. John Young 30 Stuckleckie Road Helensburgh Argyll And Bute G84 7NN
03.03.2022
31. Kathleen Young 30 Stuckleckie Road Helensburgh Argyll And Bute G84
7NN 03.03.2022
32. Roberta Kelly 10 Gallagher Way Renton Dumbarton  03.03.2022
33. Clive Burns 25 Malcolm Place Helensburgh Argyll And Bute G84 9HW
03.03.2022
34. R Boothby 5 Camperdown Helensburgh   03.03.2022
35. C Boothby 5 Camperdown Helensburgh   03.03.2022
36. Anne Marie Johnston 30 Templeton Way Helensburgh Argyll And Bute G84
8FA 03.03.2022
37. Ronald Grant 2/1 23 East Princes Street Helensburgh   03.03.2022
38. C Woolner 5 Princess Way Rosneath Helensburgh Argyll And Bute
03.03.2022
39. J Crossan 145 West King Street Helensburgh Argyll And Bute G84 8DJ
03.03.2022
40. J Cavana 31 Deanston Crescent Helensburgh   03.03.2022
41. L Nott 30 South King Street Helensburgh Argyll And Bute G84 7DX
03.03.2022
42. Margaret Harvey 37 Old Luss Road Helensburgh Argyll And Bute G84 7BN
03.03.2022
43. Tracy McGregor 1 Jeanie Deans Drive Helensburgh Argyll And Bute G84
7TG 03.03.2022
44. S Boothby 13 Kings Crescent Helensburgh Argyll And Bute G84 7RB
03.03.2022
45. Emma Campbell 1 Golf Place Helensburgh Argyll And Bute G84 9HQ
03.03.2022
46. B Cairns 36 Macleod Drive Helensburgh Argyll And Bute G84 9QU
03.03.2022
47. H Scott 77 West King Street Helensburgh Argyll And Bute G84 8EE
03.03.2022
48. William Johnston 30 Templeton Way Helensburgh Argyll And Bute G84
8FA 03.03.2022
49. Linda Conner 6 Hope Street Helensburgh Argyll And Bute G84 7EB
03.03.2022
50. Olly Ross 1 Upper Colquhoun Street Helensburgh Argyll And Bute G84
9AG 03.03.2022
51. Mick Howe Dilmun Ferry Road Rhu Helensburgh Argyll And Bute
07.03.2022
52. Kieran Robertson 18 Laggary Road Rhu Helensburgh Argyll And Bute
02.03.2022
53. Ella Lawson 2 Spys Lane Rhu Helensburgh Argyll And Bute 02.03.2022
54. S Forsyth Flat 1 8 Guthrie Place Rhu Helensburgh 02.03.2022
55. Agnes Murray 7 Church Place Rhu Helensburgh Argyll And Bute
02.03.2022
56. James Ritchie 14 Church Place Rhu Helensburgh Argyll And Bute
02.03.2022
57. A Cameron 9 Church Place Rhu Helensburgh Argyll And Bute 02.03.2022
58. Tim Brown 16 Church Place Rhu Helensburgh Argyll And Bute 02.03.2022
59. Mark Johnstone 1/2 Ardenlea Cumberland Road Rhu  02.03.2022
60. Zoe McEwan Dalarne Pier Road Rhu Helensburgh 02.03.2022
61. Charlene Hamilton Woodside Cottage Cumberland Road Rhu Helensburgh
02.03.2022
62. Patricia Drummond 16 Rhu Ellen Court Rhu Helensburgh Argyll And Bute
02.03.2022
Page 42

Page 43

63. Ross Balfour Whistlers Burn Rhu   02.03.2022
64. Bernard Howe Dilmun  Ferry Road Rhu Argyll And Bute G84 8NF
23.02.2022
65. Mrs Lynsey Petchey 3 Kidston Gardens Rhu Road Higher Helensburgh
Argyll And Bute 24.02.2022
66. Mary McGinley Ferry Coach House Ferry Road Rhu Helensburgh Argyll
And Bute 
67. Kerry Gould Tummel Cottage Cumberland Road Rhu Helensburgh
08.03.2022
68. O Johnston 12A Cairndhu Gardens Rhu   08.03.2022
69. Paul Rickards 4 Rhu House Gareloch Road Rhu Helensburgh 08.03.2022
70. Elspeth McNicol Lower Lochview Church Road Rhu  08.03.2022
71. Pauline Cochrane 9 Church Road Rhu   08.03.2022
72. Claire Harvey 14 Barge Court Rhu   08.03.2022
73. Ona McPhail 4 East Abercromby Street Helensburgh Argyll And Bute G84
7SP 08.03.2022
74. Paul King 4 East Abercromby Street Helensburgh Argyll And Bute G84 7SP
08.03.2022
75. Margaret Martin 17 Loch Drive Helensburgh Argyll And Bute G84 8PY
08.03.2022
76. Iain Martin 17 Loch Drive Helensburgh Argyll And Bute G84 8PY
08.03.2022
77. K C Gibson 14 old Luss road Balloch G83 8qp  05.03.2022
78. Graham Wylie Rhu Lodge Ferry Road Rhu Helensburgh Argyll And Bute
13.03.2022
79. David Macpherson 27C Queen Street Helensburgh Argyll And Bute G84
9QL 07.03.2022
80. Josephine Brown 21 Brae House Manse Brae Rhu Helensburgh
16.03.2022
81. H McNaught 11 Rhu Ellen Court Rhu Helensburgh Argyll And Bute
16.03.2022
82. D Miller Flat Ground/2 Sunnyside Hall Road Rhu 16.03.2022
83. Unknown Flat 3 22 Barge Court Manse Brae Rhu 16.03.2022
84. R Kilpatrick 14 Bonar Law Helensburgh   16.03.2022
85. David Fletcher 81 B West Princes Street Helensburgh   16.03.2022
86. Jenifer Cox 15 Walker Place Helensburgh   16.03.2022
87. Megan Mundie 25 Baird Avenue Helensburgh Argyll And Bute G84 8DW
16.03.2022
88. David Stewart 49B Dumbarton Road Bowling G60 5AQ  16.03.2022
89. Joan Kilpatrick 14 Bonar Law Avenue Helesnburgh   16.03.2022
90. Robert Morley Flat 1/2 18 West Clyde Street Helensburgh Argyll And Bute
16.03.2022
91. George Stewart Flat 1 Hillhead House Kirk Brae Shandon 16.03.2022
92. Fay Stewart Bochyle Kirk Brae Shandon G84 8NP 16.03.2022
93. J Cox 15 Walker Place Helensburgh   16.03.2022
94. A Cairns 36 Macleod Drive Helensburgh Argyll And Bute G84 9QU
16.03.2022
95. Graham Wylie Rhu Lodge Ferry Road Rhu Helensburgh Argyll And Bute
09.03.2022
96. Russell Leonard 39 Dennistoun Crescent Helensburgh Argyll And Bute G84
7JG 07.03.2022
97. Fiona Braddick 37 Johnson Court Helensburgh Argyll And Bute G84 7LJ
07.03.2022
98. J McMurdo Helensburgh G84 8DS   07.03.2022
99. Unknown 2/5 Hood Court Helensburgh   07.03.2022
Page 43

Page 44

100. Maire Sutherland 52 Maitland Court Helensburgh Argyll And Bute
G84 7EE 07.03.2022
101. D Hannah 10 Drumadoon Drive Helensburgh Argyll And Bute G84
9SF 07.03.2022
102. Alison Hannah 10 Drumadoon Drive Helensburgh Argyll And Bute
G84 9SF 07.03.2022
103. M Siniscalco 13 Maclachlan Road Helensburgh Argyll And Bute
G84 9BY 07.03.2022
104. Joan Bissett 13 Maclachlan Road Helensburgh Argyll And Bute G84
9BY 07.03.2022
105. Sybil Kennedy 35 Campbell Street Helensburgh Argyll And Bute
G84 8XZ 07.03.2022
106. Alistair Dickson 238 West Princes Street Helensburgh Argyll And
Bute G84 8HA 07.03.2022
107. S Mackenzie 1/1 4 Hanover Street Helensburgh  07.03.2022
108. Melanie Andrews 46 Abercromby Crescent Helensburgh Argyll And
Bute G84 9DX 07.03.2022 
ii) Summary of issues raised: 
Objection 
 Concern on the possible sub-division and use of previously approved
dwelling house on site as three short term lets 
Comment: this application solely relates to; the variation of condition
numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 relative to
planning permission 20/01150/PP however, it is noted that the owner has
since removed the commercial listing for the above 
 Concern that the supposed commercial enterprise of the site of Rhu Lodge
could impact the surrounding area 
Comment: as comment above 
 Concern that Ferry Roads integrity as an ancient right of way and drove
road as an integral part of Scottish Gaelic life and culture could be
undermined 
Comment: the principle of development has been established under the
previous consent (ref: 20/01150/PP), this application solely relates to; the
variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP 
 Concern that the character of Ferry Road could be affected by the
proposals 
Comment: as comment above 
Page 44

Page 45

 Concern that the proposals could affect the character of the surrounding
conservation area 
Comment: as comment above 
 Note that the proposed drawings are not in line with private discussions
between neighbours and the applicant 
Comment: This is not a material planning consideration 
 Concern that the boathouse as previously approved under application
reference 20/01150/PP could be used commercially 
Comment: This application solely relates to; the variation of condition
numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 relative to
planning permission 20/01150/PP. The use of this property as a
commercial business does not form part of this application nor the previous.
If this were to be the case then a future planning application would be
required for the change of use 
 Note that it is undesirable and inappropriate for a development within the
boundary of Rhu Lodge to overflow beyond the site boundary by way of
changes to Ferry Road which could affect the character and layout of Ferry
Road and the surrounding conservation area 
Comment: the principle of development has been established under the
previous consent (ref: 20/01150/PP), this application solely relates to; the
variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP 
 Concern about possible public misinformation resulting in the large number
of ‘pro-forma letters’ supporting this application which misinterpret the point
at issue 
Comment: This is not a material planning consideration 
 Note that the proposals include development on land not within the
applicant’s ownership 
Comment: Within the application form the applicant has noted that they are
the sole owner of all the land 
Support 
 Note that any increase in traffic caused by one additional 2 bed dwelling on
Ferry Road would be insignificant 
Comment: The above comments are noted 
Page 45

Page 46

 Note that a 3 bed dwelling was constructed on Ferry Road in 2018 with no
roads conditions requiring the introduction of a public road 
Comment: Each application is assessed on its own merits 
 Comment that the supposed negligible increase in traffic resulting from the
construction of a 2 bed dwelling does not require a publicly adopted road to
be installed 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety 
 Concern that the roads alterations could affect the character of Ferry Road
and the wider conservation area 
Comment: the principle of development has been established under the
previous consent (ref: 20/01150/PP), this application solely relates to; the
variation of condition numbers 3, 4, 5 and 6 and removal of conditions 7
and 8 relative to planning permission 20/01150/PP 
 Note that the introduction of a public road combined with the construction of
sea retaining walls, associated guard rails and rock armour would result in
the loss of a part of Rhu beach and mature trees 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety. The drawing submitted under this application
indicates the above interventions would be subject to a further planning
application if this were to be the proposed method of achieving the roads
conditions under consent (ref: 20/01150/PP) 
 Note that a public road is being proposed to replace the private road 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety 
 Concern that the introduction of a public road could cause more traffic and
obstructions than one additional dwelling 
Comment: as comment above 
 Comment that the change of Ferry Road from a private to public road would
be detrimental to users of the road 
Comment: as comment above 
 Note that the council currently struggle to maintain existing roads therefore,
why would they want to take on further road maintenance 
Page 46

Page 47

Comment: this is not a material planning consideration 
 Note that it is understood that 50m of stone boundary wall has to be
demolished and a number of mature trees removed to allow for the required
visibility splay. This would affect the appearance and character of the
conservation area 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety. The drawing submitted under this application
indicates the above interventions would be subject to a further planning
application if this were to be the proposed method of achieving the roads
conditions under consent (ref: 20/01150/PP) 
 Concern that the properties accessed off Ferry Road will not be able to
access their properties while improvement works are undertaken 
Comment: this is a civil matter between the parties concerned 
 Note that if the Rosslea Hotel can host large weddings while accessed off
Ferry Road then why can’t a 2 bed dwelling be built without the requirement
for the roads conditions 
Comment: Each application is assessed on its own merits 
 Concern that the provision of a public road could have a detrimental impact
on the area in terms of wildlife and beauty 
Comment: the area roads manager was consulted on the previous consent
(ref: 20/01150/PP) and requires improvements to the existing private road
in the interest of road safety 
 Note that the roads officer’s conditions as per application reference
20/01150/PP state that Ferry Road requires to be a publically adopted road
and furthermore, latterly the roads officer confirmed that the road will not be
adopted 
Comment: the roads conditions as per application reference 20/01150/PP
noted that the private road required improvements for it to be brought up to
an adoptable standard, this does not necessarily mean the road will be
adopted 
 Comment that the points raised in the community council’s consultation
response are not in relation to this application 
Comment: This application solely relates to; the variation of condition
numbers 3, 4, 5 and 6 and removal of conditions 7 and 8 relative to
planning permission 20/01150/PP. The comments raised by the community
council in relation to any supposed commercial use are subject to an
enforcement investigation 
(G) SUPPORTING INFORMATION
Page 47

Page 48

Has the application been the subject of: 
(i) Environmental Statement: No 
(ii) An appropriate assessment under the
Conservation (Natural Habitats) Regulations
1994:   
No 
(iii) A design or design/access statement:    No 
(iv) A report on the impact of the proposed
development eg. Retail impact, transport
impact, noise impact, flood risk, drainage
impact etc:   
In conclusion the request by the Council’s local
roads officer requiring the road to be
reconstructed to an adoptable standard would
have a major impact on Rhu Bay. In
accordance with the SCOTS National Road
Guide a 3.5 metre adopted road width is not
possible for the reasons given above and would
require to be 5.5 metres wide. 
This scale of works is not commensurate with
the level of development proposed and
therefore does not accord with the Council’s
planning policies or accord with Designing
Streets. 
Throughout the application process for the
dwelling house and this current application, we
have failed to see sight of the local Roads
Officer’s assessment of usage other than the
road serves more than 5 houses is a concern. 
We are also concerned at the inconsistent
approach taken by the local roads officer in
assessing other planning applications for single
dwellings served off a private road with more
than 10 houses. 
The commensurate improvements proposed for
Ferry Road have been devised following a
comprehensive assessment of usage and have
been designed to be sympathetic to the
Conservation Area. 
The proposed road improvements support road
safety and ensure any road concerns have
been satisfied giving continuous improvement
for the benefit of all road users and are of a
scale commensurate with the scale of
development.
Yes, a report by ECS
Transport Planning Ltd
has been provided. The
conclusion of this report
is included below; 
Page 48

Page 49

(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:   No   
(I) Has a Direction been issued by Scottish Ministers in terms of Regulation 30,
31 or 32:  No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i) List of all Development Plan Policy considerations taken into account
in assessment of the application. 
‘Argyll and Bute Local Development Plan’ Adopted March 2015 
LDP STRAT 1 – Sustainable Development
LDP DM1 – Development within the Development Management Zones
LDP 3 – Supporting the Protection, Conservation and Enhancement of our
Environment
LDP 9 – Development Setting, Layout and Design
LDP 11 – Improving our Connectivity and Infrastructure 
‘Supplementary Guidance to the Argyll and Bute Local Plan 2015’ (Adopted
March 2016) 
SG LDP ENV 17 –Development in Conservation Areas and Special Built
Environment Areas
SG LDP HOU 1 – General Housing Development including Affordable Housing
SG LDP Sustainable - Sustainable Siting and Design Principles
SG LDP SERV 1 – Private Sewerage Treatment Plants and Wastewater (i.e.
drainage) systems
SG LDP SERV 2 – Incorporation of Natural Features / Sustainable Systems
(SUDS)
SG LDP TRAN 4 – New and Existing, Public Roads and Private Access Regimes
SG LDP TRAN 6 –Vehicle Parking Provision 
(ii) List of all other material planning considerations taken into account in
the assessment of the application, having due regard to Annex A of
Circular 3/2013. 
 Argyll and Bute Sustainable Design Guidance, 2006 
 Scottish Planning Policy (SPP), 2014
 National Roads Development Guide
 Consultation Responses
 Third party representations 
Page 49

Page 50

Argyll and Bute proposed Local Development Plan 2 (November 2019) – The
unchallenged policies and proposals within pLDP2 may be afforded significant material
weighting in the determination of planning applications at this time as the settled and
unopposed view of the Council. Elements of the pLDP2 which have been identified as
being subject to unresolved objections still require to be subject of Examination by a
Scottish Government appointed Reporter and cannot be afforded significant material
weighting at this time. The provisions of pLDP2 that may be afforded significant weighting
in the determination of this application are listed below: 
 Policy 35 – Design of New and Existing, Public Roads and Private
Access Regimes
 Policy 36 – New Private Accesses
 Policy 37 – Development Utilising an Existing Private Access or Existing
Private Road
 Policy 38 – Construction Standards for Public Roads
 Policy 39 – Construction Standards for Private Access
 Policy 41 – Off Site Highway Improvements
  
(K) Is the proposal a Schedule 2 Development not requiring an Environmental
Impact Assessment:  No 
(L) Has the application been the subject of statutory pre-application consultation
(PAC):  No 
(M) Has a sustainability check list been submitted:  No 
(N) Does the Council have an interest in the site:  No 
(O) Requirement for a hearing: No. This is a local application. It is considered that the
proposed development is in accordance with the relevant provisions of the Argyll
and Bute Local Development Plan and that the material land-use planning issues
arising are not unduly complex. As such it is not considered that a Hearing will add
value to the determination process.    
(P) Assessment and summary of determining issues and material considerations: 
Permission is sought for the following; Variation of condition numbers 3, 4, 5 and 6
and removal of conditions 7 and 8 relative to planning permission 20/01150/PP
(Erection of dwelling house) access arrangements. The site is located at; Rhu
Lodge, Ferry Road, Rhu, Helensburgh, which is within the minor settlement
boundary of Rhu, where policies LDP DM 1 and LDP SG HOU1 of the adopted
Local Development Plan accepts the principle of small scale development (5
dwellings or less). The site is also within the Rhu Conservation Area; where polices
LPD 3 and SG LPD ENV 17 of the adopted Local Development Plan require that
Page 50

Page 51

any new development within these areas must be of the highest quality and respect
and enhance the Conservation Area. 
It is noted that the principle of development has been established under the
previous consent (ref: 20/01150/PP). This application solely relates to the variation
of roads conditions; numbers 3, 4, 5 and 6 and removal of conditions 7 and 8
relative to planning permission 20/01150/PP. 
Set out below is the main assessment from the previous consent which establishes
the principal of development on the site; 
‘Planning Permission is sought for the erection of a dwelling house within the
garden ground of; Rhu Lodge, Ferry Road, Rhu, Helensburgh. The site is within the
minor settlement boundary of Rhu, where policies LDP DM 1 and LDP SG HOU1 of
the adopted Local Development Plan accepts the principle of small scale
development (5 dwellings or less). The site is also within the Rhu Conservation
Area; where polices LPD 3 and SG LPD ENV 17 of the adopted Local Development
Plan require that any new development within these areas must be of the highest
quality and respect and enhance the Conservation Area. Within these areas
location, siting, design, materials and boundary treatments must all be high quality
and tree protection / management will be essential. The site area is approximately
1000 square metres with the site itself being generally level with a gentle slope to
the South Eastern boundary. The surrounding area is established residential. 
The site is bounded to the South East by a 2 metre high stone wall. In front of this
stone wall is the access road – Ferry Road. The proposed house plot is located to
the Southern corner of the site in front of an existing garage. There have been a
number of consents for domestic development and extension on this site. None of
these consents are located within the proposed development area for this dwelling
house. It is proposed to sub-divide the garden ground of Rhu Lodge which at
present has two vehicular accesses off Ferry Road. It is proposed that the garden
ground is divided to give this new proposed dwelling house sole access via the
existing Southern access and furthermore it is proposed that the land allocated to
this proposal will include the existing detached double garage. There are two
mature beech trees located on the proposal site however the dwelling house has
been positioned to avoid these trees and furthermore raft foundation have been
proposed over typical trench foundations to again avoid impact on the roots of
these trees. 
The proposed new dwelling house is set back from the existing stone boundary wall
by approximately 8 metres and has a footprint of approximately 110 square metres.
The dwelling house will be 1.5 storeys high (eaves approximately 8m above ground
level) and will be of a contemporary ‘boat house’ style. The two bedroom will be
located on the ground floor with the open plan living accommodation above on the
first floor. The proposed external materials are; walls & roof – standing seam zinc
(front inset elevation to have small area of timber cladding), rainwater goods –
folded PPC coated steel, base course – engineering brick, windows (including roof
lights) & doors – dark grey alu-clad. There will be a small area of decking to the
front of the proposal with a glass balustrade. 
The proposal requires careful consideration in relation to the surrounding
Conservation Area in terms of design. The primary matters for determination relate
Page 51

Page 52

to scale, siting, residential amenity and materials to ensure that a high quality
development is delivered. The proposed contemporary ‘boat house’ style dwelling
is of a high quality architectural design that is well detailed and utilises high quality
materials. The scale is appropriate to the site and wider conservation area. The
proposal is not considered over development of the site as the overall Rhu Lodge
site ownership extends to approximately 10500 square metres with the new site
boundary of the proposal extending to approximately 1000 square metres and the
new dwelling house having an approximate foot print of 110 square metres. 
The Area Roads Manager has provided observations and conditions that will be
appended to this report to ensure the means of vehicular access, sightlines and
parking/turning arrangements will be subject to further assessment by the Planning
Authority.   
Furthermore a connection to the existing public sewer may require further consents
from the Water Authority and all hardstanding areas shall comply with SUDS
regulations. These matters can be secured by notes to applicant or safeguarding
condition and be in accordance with supplementary guidance SG LDP SERV 2 -
Incorporation of Natural Features / Sustainable Drainage Systems (SuDs). 
Taking account of the above, it is recommended that planning permission be
granted. The site is within the settlement boundary where there is a presumption in
favour residential developments.  The proposed plot is considered to be acceptable
and it is considered to be of a density comparable with other plots in the area.  The
scale and design is acceptable and there are no issues with regards to loss of
amenity to surrounding properties or the wider area.  The proposals raise no issues
in terms of overlooking or loss of daylight / privacy to surrounding properties. It is
therefore considered that the proposal is in accordance with Policies LDP START1,
LDP DM1, LDP 3, LDP 9, SG LDP ENV 17, SG LDP - Sustainable Siting and
Design Principles, SG LDP HOU 1, SG LDP TRAN 4 and SG LDP TRAN 6 of the
Argyll & Bute Council Local Development Plan.’ 
As part of the previous approval’s (ref: 20/01150/PP) determination process, upon
receipt of the roads officers consultation response the applicant was contacted by
the planning authority to flag-up the roads conditions to ensure they were aware of
them and could meet them. The applicant responded that they were aware of the
roads conditions and were not concerned. It is noted at this point, if the applicant
had informed the planning authority that they could not meet the required roads
conditions then we would have proceeded with a recommendation for refusal on
roads grounds. 
It is noted that during the determination process a revised package of information
was submitted by the applicants which included a set of revised drawings, a report
by ECS Transport Planning Ltd and a covering letter from the agent which details
the basis of their reasoning behind their proposal to vary / remove the roads
conditions relative to planning permission 20/01150/PP and what variations /
omissions are being proposed. The roads officer was subsequently re-consulted on
the basis of this revised package of information and in turn the applicants have
passed comment on this consultation, to which the roads officer has provided a
further response. 
Page 52

Page 53

This application solely relates to the variation of roads conditions; numbers 3, 4, 5
and 6 and removal of conditions 7 and 8 relative to planning permission
20/01150/PP. The previous conditions as per 20/01150/PP, the proposed
variations/omissions and the roads officers’ consultation response to this
application are assessed in Appendix A. 
On the basis of the assessment in Appendix A, subject to planning conditions, it is
considered that the proposed development is in accordance with the relevant
provisions of the Argyll and Bute Local Development Plan – 2015 and all other
associated guidance. 
(Q) Is the proposal consistent with the Development Plan: Yes 
(R) Reasons why Planning Permission or Planning Permission in Principle Should
be Granted: 
It is considered that, subject to planning conditions, the proposed development is in
accordance with all relevant provisions of the Argyll and Bute Local Development
Plan and does not give rise to any other material land-use planning matters such as
would warrant a departure to these provisions 
(S) Reasoned justification for a departure to the provisions of the Development
Plan 
Not applicable – It is considered that the proposed development accords with all
relevant provisions of the Development Plan 
(T) Need for notification to Scottish Ministers or Historic Environment Scotland:
No 
Author of Report: Emma Jane Date: 08.11.2022 
Reviewing Officer: Howard Young Date: 08.11.2022 
Fergus Murray
Head of Development & Economic Growth 
Page 53

Page 54

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 21/02709/PP 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on
the application form dated 20/12/2021 and, the original approved drawings from
application ref; 20/01150/PP listed in the table below and the related amendment
approved under this unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town
and Country Planning (Scotland) Act 1997. 
Plan Title.  Plan Ref. No. Version Date
Received
Location Plan 1 of 14 A 02.02.2020
Site Photographs
Sheet 1
2 of 14 A 02.02.2020
Site Photographs
Sheet 2
3 of 14 C 02.02.2020
Site Photographs
Sheet 3
4 of 14 - 02.02.2020
Site Photographs
Sheet 4
5 of 14 - 02.02.2020
Site Plan/Roof Plan
as Proposed
6 of 14 C 02.02.2020
Floor Plans as
Proposed
7 of 14 A 02.02.2020
North and West
Elevations as
Proposed
8 of 14 B 02.02.2020
South and East
Elevations as
Proposed
9 of 14 B 02.02.2020
Cross Section X X
as Proposed
10 of 14 - 02.02.2020
Proposed
Landscape and
Planting Layout
Plan
11 of 14 - 02.02.2020
Topographic Survey 12 of 14 - 02.02.2020
Arboricultural
Report
13 of 14  - 02.02.2020
Design and Access
Statement 2020
14 of 14 - 02.02.2020 
Reason: For the purpose of clarity, to ensure that the development is implemented
in accordance with the approved details. 
2. Notwithstanding the effect of Condition 1; Prior to the commencement of
development the developer shall submit written evidence to the Planning Authority
that an agreement with Scottish Water is in place for the connection of the proposed
development to the public water supply. 
Page 54

Page 55

Reason: In the interests of public health and to ensure the availability of an
adequate water supply to serve the proposed development. 
3. Notwithstanding the effect of Condition 1; the following improvement works to the
access road are required: 
a) The provision of a 3.5 metre adopted road between A814 and the entrance
dwellings. 
b) Passing places at a maximum of 100 metre spacing’s should be provided as
per Operational Services Drg No SD 08/003 rev a. 
Full details of these proposed road improvements at Ferry Road shall be submitted
to and agreed in writing with the Planning Authority in consultation with the Council’s
Road Network Manager prior to works commencing on site. Thereafter the
improvements shall be completed and in place before the dwellinghouse hereby
approved shall be completed or brought into use. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
4. Notwithstanding the effect of Condition 1; In accordance with ‘Roads Guidance
For Developers’ a sightline visibility splay of 2.4 x 25 x 1.05 metres at the driveway
access with Ferry Road. Prior to work starting on site this visibility splay shall be
cleared of all obstructions over one metre in height above the level of the adjoining
carriageway and thereafter shall be maintained clear of all obstructions over one
metre in height to the satisfaction of the Planning Authority. 
Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
5. Notwithstanding the effect of Condition 1; The private access to the dwelling
house should be constructed as per Drg SD 08/002. 
Reason: In the interest of road safety and in accordance with the Council’s Roads
Guidance for Developers'. 
6.  Notwithstanding the effect of Condition 1; Prior to construction of the dwelling 
house, the private access shall be surfaced with bituminous material (or other
approved hard material) for a distance of 5m from the edge of the carriageway and
graded to prevent the discharge of water/materials onto the public road. 
Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
7.  Notwithstanding the effect of Condition 1; The gradient of the private accesses
will not exceed 5% for the first 5 metres and no more than 12.5% over the remainder
of the access. Details of this shall be submitted to and approved in writing by the
Planning Authority prior to works starting on site.
Page 55

Page 56

Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
8.  Notwithstanding the effect of Condition 1; Prior to work starting on site full details
of 2 No. parking spaces to be provided within the curtilage of the dwellinghouse shall
be submitted to and approved in writing by the Planning Authority. Thereafter the
required car parking spaces shall be fully implemented prior to the occupation of the
dwellinghouse.  
Reason: In the interest of road safety and in accordance with the Council’s 'Roads
Guidance for Developers'. 
9. Notwithstanding the effect of Condition 1; Samples of the proposed materials to be
used for the external walls and roof of the development hereby granted consent shall
be submitted to and approved in writing by the Planning Authority prior to any work
starting on site. 
Reason: In the interests of visual amenity and in order to integrate the proposal with
its surroundings. 
Page 56

Page 57

NOTE TO APPLICANT 
•The proposed road improvements to the existing private road to bring it to an
adoptable standard will require the submission of an application for a roads
construction consent. After subsequent Approval a finance security road bond will be
required to be lodged before any works commence on site. 
Page 57

Page 58

APPENDIX A – RELATIVE TO APPLICATION NUMBER: 21/02709/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
A. Settlement Strategy 
The application site is located within the minor settlement boundary of Rhu, where
policies LDP DM 1 and LDP SG HOU1 of the adopted Local Development Plan accepts
the principle of small scale development (5 dwellings or less). 
It is therefore considered that the original proposed development for a dwellinghouse
is consistent in principle with the LDP Settlement and Spatial Strategy. 
B. Location, Nature and Design of Proposed Development 
The application site area is approximately 1000 square metres and sits within the
garden ground of; Rhu Lodge, Ferry Road, Rhu, Helensburgh. The site is generally
level with a gentle slope to the South Eastern boundary. The surrounding area is
established residential. The site is bounded to the South East by a 2 metre high stone
wall. In front of this stone wall is the access road – Ferry Road. 
The principle of development has been established under the previous consent (ref:
20/01150/PP), as such the key issues in this instance do not relate to establishing the
principal of development but to the roads and access issues. An extract from the
original report justifying the dwellinghouse is included above. 
C. Road Network, Parking and Associated Transport Matters. 
The site is served by an existing private road, Ferry Road. Policy LDP 11 and SG LDP
TRAN 4 generally require that new development is served by an appropriate standard
of access and SG LDP TRAN 6 requires that adequate provision is made for off-street
car parking in accordance with approved parking standards. 
The consultation response from the Council’s Area Roads Engineer has noted that in
accordance with SG LDP TRAN 4; 
(A) Developments shall be served by a public road (over which the public have right of
access and maintainable at public expense; 
Except in the following circumstances:-
(2) Further development that utilises an existing private access or private road will only
be accepted if:- 
(i) the access is capable of commensurate improvements considered by the Roads
Authority to be appropriate to the scale and nature of the proposed new development
and that takes into account the current access issues (informed by an assessment of
usage); AND the applicant can; 
(ii) Secure ownership of the private road or access to allow for commensurate
improvements to be made to the satisfaction of the Planning Authority; 
Further to this the roads officer has noted the following issues with the current access;   
Page 58

Page 59

1. Existing carriageway width is less than the acceptable carriageway width of 3.5m for
emergency services vehicles
2. No intervisible Passing Places
3. No formal turning head 
SG LDP TRAN 4 notes that the private access shall be constructed to incorporate
minimum standards to function safely and effectively as set out in the Council’s Road
Development Guide, in particular in relation to adequate visibility splays, access
gradients, geometry, passing places, boundary definition, turning capacities, integrated
provision for waste management and recycling. 
When reviewing the below planning conditions ‘Circular 4/1998: The use of
conditions in planning permissions’ has been considered and in particular the six
tests as follows; 
Conditions imposed on a grant of planning permission can enable many 
development proposals to proceed where it would otherwise have been necessary to 
refuse planning permission. While the power to impose planning conditions is very 
wide, it needs to be exercised in a manner which is fair, reasonable and practicable. 
Planning conditions should only be imposed where they are: 
 Necessary
 relevant to planning
 relevant to the development to be permitted
 enforceable
 precise
 reasonable in all other respects 
Set out below are the original conditions together with the suggested amendments
and an analysis in conjunction with the roads area manager. 
Condition 3 as per approval reference 20/01150/PP; 
Notwithstanding the effect of Condition 1; the following improvement works to the
access road are required: 
a) The provision of a 3.5 metre adopted road between A814 and the entrance
dwellings.
b) Passing places at a maximum of 100 metre spacing’s should be provided as per
Operational Services Drg No SD 08/003 rev a. 
Full details of these proposed road improvements at Ferry Road shall be submitted to
and agreed in writing with the Planning Authority in consultation with the Council’s
Road Network Manager prior to works commencing on site. Thereafter the
improvements shall be completed and in place before the dwellinghouse hereby
approved shall be completed or brought into use. 
Page 59

Page 60

Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to replace conditions 3a & b with the following; 
Notwithstanding the effect of Condition 1; prior to the first occupation of the dwelling
hereby approved, the following improvement works to the access road are required: 
The provision of a private access road, between the A814 and the entrance to the
approved new dwelling, with a minimum width of 3.5 metres, incorporating the traffic
calming measures as shown on approved ECS drawing number 22034_006, and
drawings 19/20/R2 Rev A, 19/20/R4 Rev B, 19/20/R5 Rev B, 19/20/R7 Rev B and
19/20/R9 Rev B. 
The applicants have provided a detailed reasoning as to why this condition should be
changed, which has been summarised below; 
The applicants have stated that the local roads officer fails to provide reasons to
demonstrate that the additional traffic generated from a new single dwelling would
make Ferry Road unsafe. They also note that condition 3 (a) requires a 3.5 metre
adopted road; however, this fails to adhere to the National Road Development Guide,
their reasoning behind this is to ensure that the utility providers are able to gain access
to their apparatus in the future and if Ferry Road is required to be reconstructed to an
adoptable standard it would be necessary to provide a 5.5 metre wide carriageway not
3.5 metres. 
In terms of 3 (b) the applicants have noted that the minimum standard detailed for a
private access within the Council’s LP and LDP allow for a 4.5 metre width for a
distance of 10 metres from the junction with the public road. As a 4.5 metre access
width is acceptable at the location with the highest risk. The passing place design
should take account of the setting of the place and the type of traffic travelling along
the route. Except for the bin lorry the general vehicle movements are standard motor
cars. Therefore, the requirement for all passing places to be 5.5 metres wide is an over
engineered solution. 
Conclusion; 
The roads officer has concluded that conditions 3a & 3b should remain unchanged for
the reasons detailed below; 
In response to the above the roads officer has provided an extract from the National
Roads Development Guidance, paragraph 3.1.6 (e), Services in Shared Surfaces,
which facilitates service strips within the running surface and notes that manholes
should be located within parking areas or widened areas within the total road width.
Therefore, the roads officer notes that it would be possible for utility providers to gain
access to their apparatus on a 3.5 metre wide carriageway. The roads officer has also
noted; the provision of 3.5m adoptable road accounts for the presence of the existing
verge, were the carriageway to be bound by a wall, the minimum width for emergency
service vehicles, as per the National Roads Development Guide is 3.7m. A minimum
road width of 3.5 plus verge is therefore, required to facilitate safe access and egress
of pedestrians, vehicles and emergency service vehicles. In addition, roads have
commented that the surfacing extents shown with drawing 19/20/R9B do not comply
Page 60

Page 61

with the aforementioned condition to provide a 3.5 metre adopted road between the
A814 and the entrance dwellings. 
The roads officer has also advised that a lack of forward visibility has underlined the
requirement for localised carriageway widening to 5.5m at points of intervisibility. To
allow any further development on this private access road, intervisible passing places
must be provided and constructed in accordance with SD08/003. All vehicle passing
places should be constructed in accordance with the minimum geometry requirements
set out with SD08/003. They also note that on review of drawing 22034_006 and in
accordance with the National Roads Development Guide, all intervisible passing
places should provide a minimum width, throughout its length, of 5.5 metres, note this
should be shown over the length of the intervisible passing place and not solely at the
radius/ access point. 
Further to the above the roads officer has advised that as the existing road currently
serves 10 dwellings and a hotel, the private access road is deemed substandard and
will, in the interest of pedestrian and vehicle safety require improvements prior to any
further development. The roads officer has further commented that on review of the
revised drawings the removal of an existing verge/ pedestrian ‘step-off’, between the
A814 and the access to the Rosslea property, to achieve a minimum carriageway width
is considered an unacceptable method towards achieving a minimum carriageway
width. This is in direct contradiction of the hierarchy of road users and, places vehicle
traffic over pedestrian movements. As such, the removal of any existing verge/ ‘step-
off’ would not be supported. 
Condition 4 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; In accordance with ‘Roads Guidance For
Developers’ a sightline visibility splay of 2.4 x 42 x 1.05 metres at the driveway access
with Ferry Road. Prior to work starting on site this visibility splay shall be cleared of all
obstructions over one metre in height above the level of the adjoining carriageway and
thereafter shall be maintained clear of all obstructions over one metre in height to the
satisfaction of the Planning Authority. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to replace condition 4 with the following; 
Notwithstanding the effect of Condition 1; prior to the first occupation of the dwelling
hereby approved, the access to the dwelling hereby permitted shall be formed in
accordance with the details shown on approved ECS drawings number 22034_006
and drawing 19/20/R10. The access shall incorporate visibility splays measuring 2 x
25 x 1.05 metres, and these shall be maintained in perpetuity, unless otherwise agreed
in writing with the Local Planning Authority. 
Conclusion; 
The roads officer has concluded that condition 4 should be altered for the reasons
detailed below; 
Page 61

Page 62

The original roads consultation response to application 20/01150/PP noted a sightline
visibility splay of 2.4 x 25 x 1.05 metres at the driveway access with Ferry Road.
Whereas the decision notice noted 2.4 x 42 x 1.05 metres. Therefore this condition
should be altered to; 
Notwithstanding the effect of Condition 1; In accordance with ‘Roads Guidance For
Developers’ a sightline visibility splay of 2.4 x 25 x 1.05 metres at the driveway access
with Ferry Road. Prior to work starting on site this visibility splay shall be cleared of all
obstructions over one metre in height above the level of the adjoining carriageway and
thereafter shall be maintained clear of all obstructions over one metre in height to the
satisfaction of the Planning Authority. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Condition 5 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The private access to the dwelling house
should be constructed as per Drg SD 08/002. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to replace condition 5 with the following; 
Notwithstanding the effect of Condition 1; Prior to the first occupation of the dwelling
hereby permitted, the parking and turning provisions as shown on approved Drawing
19/20/10 shall be implemented in full. Thereafter the approved parking and turning
provisions shall be maintained in perpetuity, unless otherwise agreed in writing with
the Local Planning Authority. 
The applicants have provided a detailed reasoning as to why this condition should be
changed, which have been summarised below; 
The applicants have stated that the local roads officer fails to recognise that this private
access is in fact an individual driveway for which the minimum width of 2.75 metres is
all that is required to be in accordance with the National Road Development Guide.
The applicants have also noted; that the gradient shown is less than the 12.5% (1 in
8), the existing levels show a gradient 1 in 11.6 (8.5%) this is below the maximum
gradient requirements and they have confirmed that it would be possible to provide
drainage to prevent surface water discharge. 
Conclusion; 
The roads officer has concluded that condition 5 should remain unchanged for the
reasons detailed below; 
Page 62

Page 63

The roads officer has noted that the access should be constructed in accordance with
SD08/002 titled, Private Drive Way from Un-kerbed Road. Within which, drawing note
6 details “Where access is bounded by walls the minimum width will be 3.7m.”
therefore, 2.75m is unacceptable. Furthermore, the roads officer has commented on
drawing 19/20/R10 and notes, that this drawing fails to detail a minimum access width
of 4.5m, does not achieve the drainage requirements defined with SD 08/002A and
fails to detail the radius of the realigned boundary walls. 
Condition 6 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The private access shall be surfaced with
bituminous material for a distance of 5 metres from the edge of the carriageway and
graded to prevent the discharge of water/materials onto the public road. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to remove condition 6 as they believe this condition conflicts with 
condition 5 which allows for a bituminous or concrete surface, and they have 
suggested that it is not unreasonable to vary the condition to allow for any other 
approved hard material. 
Conclusion; 
The roads officer has concluded that condition 6 can be amended as follows; 
Notwithstanding the effect of Condition 1; Prior to construction of the dwelling 
house, the private access shall be surfaced with bituminous material (or other
approved hard material) for a distance of 5m from the edge of the carriageway and
graded to prevent the discharge of water/materials onto the public road. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Condition 7 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The gradient of the private accesses will not
exceed 5% for the first 5 metres and no more than 12.5% over the remainder of the
access. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to remove condition 7 as the gradient requirements have been
detailed within the most recent drawing package. 
Page 63

Page 64

Conclusion; 
The roads officer notes that whilst the gradient requirements have been detailed within
the most recent drawing ref; 19/20/R10, there are other elements included within this
drawing which are not in accordance with roads guidance. Therefore, this condition
shall remain as part of the application review to ensure implementation. However, it is
noted that the phasing was not included within this condition and therefore, the roads
officer has concluded that condition 7 can be amended as follows;     
Notwithstanding the effect of Condition 1; The gradient of the private accesses will not
exceed 5% for the first 5 metres and no more than 12.5% over the remainder of the
access. Details of this shall be submitted to and approved in writing by the Planning
Authority prior to works starting on site. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Condition 8 as per approval 20/01150/PP; 
Notwithstanding the effect of Condition 1; The provision for car parking within the
curtilage of each dwelling shall be in accordance with the Council’s Local Development
Plan supplementary guidance SG LDP TRAN 6 Vehicle Parking Provision. 
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Proposed change as per this application;
The applicants wish to remove condition 8 as the parking provision requirements have
been detailed within the most recent drawing package. 
Conclusion; 
The roads officer notes that whilst the parking provision requirements have been
outlined within the most recent drawing ref; 19/20/R10, there are other elements
included within this drawing which are not in accordance with roads guidance.
Therefore, this condition shall remain as part of the application review to ensure
implementation. However, it is noted that the phasing was not included within this
condition and therefore, the roads officer has concluded that condition 8 can be
amended as follows;   
Notwithstanding the effect of Condition 1; Prior to work starting on site full details of 2
No. parking spaces to be provided within the curtilage of the dwellinghouse shall be
submitted to and approved in writing by the Planning Authority. Thereafter the required
car parking spaces shall be fully implemented prior to the occupation of the
dwellinghouse.  
Reason: In the interest of road safety and in accordance with the Councils 'Roads
Guidance for Developers'. 
Page 64

Page 65

When reviewing the above planning conditions it is considered that they do meet the
six tests as per ‘Circular 4/1998: The use of conditions in planning permissions’.
Based on the above assessment, it is considered that subject to the revised
conditions set out above, the proposed development is in accordance with the
relevant provisions of the Argyll and Bute Local Development Plan – 2015 and all
other associated guidance.   
Page 65

Page 66

This page is intentionally left blank

Page 67

Page 67

Page 68

This page is intentionally left blank

Page 69

Argyll and Bute Council  
Development and Economic Growth       
This Supplementary Report is an update to Members following the adoption of NPF 4
on 13 February 2023 and its materiality to the application.
_________________________________________________________________________     
Reference No: 22/01298/S37     
Applicant:       The Scottish Government on behalf of Scottish Hydro Electric 
Transmission Plc 
Proposal: Construction of approximately13.3 km of 275 kV Over Head Line (OHL)
from between a proposed substation at Creag Dhubh to the existing
Scottish Power Energy Networks (SPEN) 275 kV OHL that runs from
Dalmally to Inverarnan. 
Site Address:  Land South Of Dalmally and East of Cladich 
________________________________________________________________________   
SUPPLEMENTARY REPORT NO. 1 
1. INTRODUCTION 
This Section 37 proposal was originally presented to Members on the 28.9.22 with an officer
recommendation that no objection be lodged. The Committee determined, on behalf of the
Council, as Planning Authority, to object to this proposal for the following reason; 
The proposal will have adverse landscape and visual impacts (including cumulative) within an
Area of Panoramic Quality, and in particular from the Duncan Ban Monument, and is therefore
inconsistent with the provisions of: LDP DM1 – Development within the Development
Management Zone; LDP 3 – Supporting the Protection, Conservation and Enhancement of
our Environment; LDP 6 – Supporting the Sustainable Growth of Renewables; LDP 9 –
Development Setting, Layout and Design; SG LDP ENV 13 – Development Impact on Areas
of Panoramic Quality; and SG LDP ENV 16(a) – Development Impact on Listed Buildings; of
the Argyll and Bute Local Development Plan. 
The Energy Consents Unit was notified of this decision accordingly. As a result of the objection
from the Planning Authority, in terms of the Electricity Act, if that objection is not withdrawn
the Scottish Ministers must cause a Public Inquiry to be held. The case is currently with the
DPEA and a Reporter has been appointed. The appeal reference is TRL-130-1 and a link to
the DPEA website is provided below. 
Scottish Government - DPEA - Case Details (scotland.gov.uk) 
Since Members determined to object on 28.9.22 Officers consider that there has been a
substantial and material change in circumstances which merits the matter being brought back
to Members. National Planning Framework 4 (NPF4) has become part of the statutory
planning framework with it being formally adopted on 13.2.23. 
Page 69 Agenda Item 5

Page 70

2. RE-CONSULTATION 
General Background 
As the Planning Authority’s decision to object to the current was taken prior to the NPF4 being
adopted and forming part of the development plan (as referenced in Section 25 of the Planning
Act 1997), Officers considered it expedient, to give the Members the opportunity to consider
whether they wish to continue to object to the proposals. 
The case is currently with the DPEA and no decision has been made to allow or refuse the
proposal. The implications of NPF 4 on the merits of the proposal will be a matter which will
require to be considered by the Reporter before making a decision. It was therefore considered
appropriate to allow members the opportunity to express their own views on this matter. 
This report therefore seeks Members’ views on whether the adoption of NPF 4 and its contents
would lead to the previous recommendation being altered. 
3. STATUS OF NPF4 
Clearly the status and importance of NPF4 as part of the decision making process has
changed since the Council made a decision to object to the proposal. NPF 4 has from 13.2.23
replaced National Planning Policy 3 (NPF3) and Scottish Planning Policy 2014 (SPP). It has
become the national element of the statutory development plan – for all parts of Scotland.
NPF4 should now be given significant weight in the decision-making process. 
4. ASSESSMENT OF PROPOSAL AGAINST NPF4
A link to the adopted version of NPF 4 is provided below for Members ease of reference:
National Planning Framework 4 (www.gov.scot)
The Spatial Strategy in NPF4 sets out that we are facing unprecedented challenges and that
we need to reduce greenhouse gas emissions and adapt to future impacts of climate change.
It sets out that that Scotland’s environment is a national asset which supports our economy,
identity, health, and wellbeing. It sets out that we have already taken significant steps towards
decarbonising energy and land use, but choices need to be made about how we can make
sustainable use of our natural assets in a way which benefits communities. The Spatial
Strategy reflects legislation in setting out that decisions require to reflect the long-term public
interest. 
However, in doing so it is clear that we will need to make the right choices about where
development should be located ensuring clarity is provided over the types of infrastructure that
needs to be provided and the assets that should be protected to ensure they continue to
benefit future generations. The Spatial Priorities support the planning and delivery of
sustainable places, where we reduce emissions, restore, and better connect biodiversity;
liveable places, where we can all live better, healthier lives; and productive places, where we
have a greener, fairer, and more inclusive wellbeing economy. 
Eighteen “National Developments” support this strategy. National developments will be a
focus for delivery, as well as exemplars of the Place Principle, placemaking and a Community
Wealth Building (CWB) approach to economic development. 
The type of development subject to this application is identified as a national development of
“Strategic Renewable Electricity Generation and transmission Infrastructure”. Specific
Page 70

Page 71

commentary in the importance of the delivery of nationally important transmission
infrastructure is provided at Page 104. This clarifies that:
This national development supports renewable electricity generation, repowering, and
expansion of the electricity grid. 
A large and rapid increase in electricity generation from renewable sources will be essential
for Scotland to meet its net zero emissions targets. Certain types of renewable electricity
generation will also be required, which will include energy storage technology and capacity, to
provide the vital services, including flexible response, that a zero carbon network will require.
Generation is for domestic consumption as well as for export to the UK and beyond, with new
capacity helping to decarbonise heat, transport and industrial energy demand. This has the
potential to support jobs and business investment, with wider economic benefits. 
The electricity transmission grid will need substantial reinforcement including the addition of
new infrastructure to connect and transmit the output from new on and offshore capacity to
consumers in Scotland, the rest of the UK and beyond. Delivery of this national development
will be informed by market, policy and regulatory developments and decisions.
Page 104 of NPF 4 further clarifies that:
Additional electricity generation from renewables and electricity transmission capacity of scale
is fundamental to achieving a net zero economy and supports improved network resilience in
rural and island areas....
There is in principle substantial policy support for the current proposals with NPF 4 as they
have been identified of national importance in the delivery of Scotland’s Spatial Strategy and
national grid improvements necessary to transmit renewable energy. However, any project
identified as a national development also requires to be considered at a project level against
the other policies of NPF 4 applicable to the proposal to ensure evaluation against the
objectives of NPF 4 as a whole is undertaken. This includes consideration against the
provisions of the Development Plan, of which National Planning Framework 4 is now a part.  
Within NPF 4 there are specific policies which Officers consider to be most directly applicable
to the current proposals in terms of considering whether the proposal complies with NPF 4.
These are set out below;
NPF4 - Policy 1 – Tackling the Climate and Nature Crisis
The intention of policy 1 is to” encourage, promote and facilitate development that addresses
the global climate emergency and nature crisis”. Planning Authorities are advised that “When
considering all development proposals significant weight will be given to the global climate
and nature crises”.
Members are requested to have regard to and consider the stated objectives of Policy 1 in
reaching a recommendation.
NPF4 - Policy 11: Energy – The intention of Policy 11 is to: 
“...encourage, promote and facilitate all forms of renewable energy development onshore and
offshore. This includes energy generation, storage, new and replacement transmission and
distribution infrastructure and emerging low-carbon and zero emissions technologies including
hydrogen and carbon capture utilisation and storage (CCUS)”. 
Policy 11 sets out that development proposals for all forms of renewable energy (including
new and replacement transmission and distribution infrastructure such as the current
proposals) will be supported. 
Page 71

Page 72

This policy continues to set out that proposals will only be supported where they demonstrate
how, through project design and mitigation, the impact on a range of considerations has been
addressed. This allows for consideration of matters related to impacts on communities and
individual dwellings in relation to amenity; landscape and visual impact; public access; aviation
and defence interests; telecommunications; traffic; historic environment; biodiversity (including
birds); impacts on trees; decommissioning; site restoration; and cumulative effects. 
While the weight to be given to each of the considerations in Policy 11 is a matter for the
decision maker, NPF4 is clear that significant weight will require to be placed on the
contribution of the proposal to providing new nationally important electricity grid infrastructure
associated with the transmission of renewable energy. In relation to landscape and visual
impacts it advises that where impacts are localised and / or appropriate design mitigation has
been applied such effects will generally be considered acceptable. 
This support is not however to the exclusion of other factors, a balance still requires to be
struck in terms of the impact of development. NPF4 must be read as a whole, and detailed
consideration given to linked policies, such as Policy 4: Natural Places, considered below.
Project design and mitigation needs to show how impacts (both individual and cumulative) on
numerous receptors, including the natural environment have been addressed.
NPF4 Policy 4: Natural Places – The intention of Policy 4 is to protect, restore and enhance
natural assets, making the best use of nature-based solutions. The policy outcome is that
natural places are protected and restored, and natural assets are managed in a sustainable
way that supports and grows their essential benefits and services. Of relevance to this
proposal is policy 4(a) which sets out that development proposals which by virtue of type,
location or scale will have an unacceptable impact on the natural environment will not be
supported. 
This policy seeks to “protect, restore and enhance natural assets making best use of nature-
based solutions”. It is further clarified at (d) that;  
Development proposals that affect a site designated as a local nature conservation site or
landscape area in the LDP will only be supported where: i. Development will not have
significant adverse effects on the integrity of the area or the qualities for which it has been
identified; or ii. Any significant adverse effects on the integrity of the area are clearly
outweighed by social, environmental or economic benefits of at least local importance. 
Officers remain of the view that landscape impacts remain limited and acceptable. Such
impacts as occur have to be weighed against other policies of NPF 4 and also the specific
identification of electricity grid infrastructure upgrades as being an important aspect in meeting
the objectives of Policy 1 and in respect of the objectives of NPF 4 policy 11 outcomes. 
It should also be noted that neither NatureScot nor the Council’s Biodiversity Officer raised
objections to the proposals on impact upon natural environment as the mitigation set out in
the EIAR was considered to satisfactorily address these matters. 
It is Officers’ opinion that the proposals are considered acceptable in respect of NPF 4 Policy
4 objectives. 
NPF Policy 7 – Historic Assets and Places 
Page 72

Page 73

In this instance Members have expressed concerns in their objection to the impacts of the
development on not only landscape but also to the setting of the Duncan Ban Monument which
is a Category B Listed building. 
NPF 4 Policy 7 seeks to “protect and enhance historic environment assets and places, and to
enable positive change as a catalyst for the regeneration of places”. 
It is further clarified in Policy 7 that: 
a) Development proposals with a potentially significant impact on historic assets or places will
be accompanied by an assessment which is based on an understanding of the cultural
significance of the historic asset and/or place. The assessment should identify the likely visual
or physical impact of any proposals for change, including cumulative effects and provide a
sound basis for managing the impacts of change. 
Proposals should also be informed by national policy and guidance on managing change in
the historic environment, and information held within Historic Environment Records 
As set out in the original Committee Report, the Council’s Conservation advisor was of the
opinion that any harm caused to the setting of the Duncan Ban Monument did not justify
objecting to the proposal. 
In respect of the balance of judgement in considering NPF 4 and its policies, Officers consider
that the support for the proposals has strengthened within NPF 4 (Policies 1 and 11 in
particular as previously referenced), and therefore Officers consider that the weight of policy
support for the proposals has increased due to the adoption of NPF4 and this outweighs any
impact on the setting of the Listed Building. 
5. Conclusion
Officers consider that following the adoption of NPF 4 on 13.02.23 more weight should be
given to the policies within it which support the delivery of nationally important energy
transmission and grid infrastructure to assist in the transition to net zero and address the
climate emergency. 
NPF 4 Policies 1 and 11 provide support for the current proposals as Nationally Important
Development. This in the opinion of Officers strengthened the overall policy framework in
support for the proposals since Members previously determined to object to the development
on 28.09.22. 
Officers therefore consider it appropriate to give Members the opportunity to reconsider the
current Objection in the light of this new and more supportive statutory planning policy
framework set out in NPF4. 
Recommendation 
Members are invited to re-consider their decision to object to the proposals in light of
the enhanced status of NPF4 and instruct Officers accordingly on this matter. 
Author of Report: David Moore       Date: 07.03.23
Reviewing Officer: Sandra Davies       Date: 07.03.23 
 
  
Page 73

Page 74

Fergus Murray   
Head of Development and Economic Growth  
Page 74

Page 75

Page 75

Page 76

This page is intentionally left blank