Appendix 1 - Local Housing Strategy 2022-27 Annual Progress Report

Perth and Kinross Council · 19 June 2024
Back to Housing and Social Wellbeing Committee — 19 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Appendix 1 
Perth and Kinross 
Local Housing Strategy
2022-2027
Annual Progress Report for 
2022-23 and 2023-24

Page 2

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                          2 
Perth and Kinross Local Housing Strategy 2022-2027 Annual Progress Report for
Year 1 and Year 2
The Local Housing Strategy (LHS) 2022-2027 sets out Perth and Kinross five-year plan for
the direction and delivery of housing for the area. Scottish Government Guidance states
that local authorities must review LHS actions annually in order to evidence progress on
how the LHS is implementing its priorities and plans within the five-year period. This is the
first annual progress update to Housing and Social Wellbeing Committee in implementing
the strategy and covers Year 1 (2022-23) and Year 2 (2023-24). The aim of the LHS 2022-
2027 is: 
To achieve this vision and realise the wider ambitions set out in the Local Outcomes
Improvement Plan 2022-2032, the four LHS priorities are: 
Within each LHS Priority there are a series of detailed Outcome Action Plans which set
specific actions with timescales, resources, and partner responsibilities. The LHS Delivery
Group continues to co-ordinate, monitor and guide implementation and delivery, and
evaluate the impact of housing led activity, partnership, and investment.
The LHS Action Plan, activities and targets will be reviewed annually to ensure services
and partners are able to respond flexibly to changes in need across Perth and Kinross.

Page 3

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                          3
Achievements  
Priority 1: Providing more affordable homes to support liveable and sustainable
communities
In 2022-23:
▪ Delivered a total of 220 affordable homes including 128 for social
rented housing, 25 for low-cost home ownership, and 67 for mid-
market rent. 
▪ Delivered 10 Council new build homes and supported the completion
of 156 new build affordable homes in partnership with RSLs across 11
developments.
▪ Delivered new supply across the Perth and Kinross area, both in
urban 40% and rural 60% areas, including Council homes completed
in Abernethy.
▪ Purchased 36 buybacks to increase the Council’s housing stock.
▪ Brought back 18 empty homes for people in need of accommodation
through the Empty Homes Initiative (EHI).
▪ Supported the completion of 5 Housing Needs Assessments in rural
areas. 
In 2023-24:
▪ Delivered a total of 174 affordable homes including 141 for social
rented housing, 33 for mid-market rent. 
▪ Delivered 40 Council new build homes and supported the completion
of 65 new build affordable homes in partnership with RSLs across 5
developments.
▪ Delivered new supply across the Perth and Kinross area, both in
urban 36% and rural 64% areas.
▪ Purchased 48 buybacks to increase the Council’s housing stock.
▪ Brought back 20 empty homes for people in need of accommodation
through the Empty Homes Initiative (EHI).
▪ Piloted the first Urban Capacity and Brownfield Study in one rural area
to assess potential of land for housing.
▪ Established our first Self-Build Register with 14 self-build expressions
of interested registered to date.
▪ Published our Sustainable Inclusive Homes Net Zero Carbon Design
Guide which details construction innovation and house design for
affordable homes.
▪ Undertook preliminary feasibility and consultation for planning policy to
be developed through LDP3 for Short Term Let (STL) control areas,
with research and feedback helping to shape the non-statutory
Planning Guidance in place to help assess and determine planning
applications for changes of use from a house or flat to a short-term let.

Page 4

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                          4
Achievements 
Priority 2: Providing a range of housing options that people can easily access,
afford and keep
In 2022-23:
▪ Supported 1769 households to sustain their tenancy through our
Tenancy Sustainment Fund, Financial Inclusion Project and Think
Yes budget.
▪ Launched a new self-serve online Housing Options service, making it
easier for people to access a range of housing options.
▪ Supported 4 refugees and 450 people from Ukraine to settle into
accommodation.
▪ Continued to develop our Home First model with a focus on building
resilience in the face of increased demand, minimising the need for
temporary accommodation and supporting people to have successful
tenancies through our Property Ready Fund and the provision of
housing support. 
In 2023-24:
▪ Supported 2635 households to sustain their tenancy through our
Tenancy Sustainment Fund, Financial Inclusion Project and Think
Yes budget.
▪ Supported 29 households in the PRS to sustain their tenancies and
prevent homelessness and hardship.
▪ Carried out a review and consultation of our Common Allocations
Policy which includes proposing a new downsizing policy with
improved incentives to enable better targeting of properties that are
under-occupied and progressing key worker housing.
▪ Became a local authority member of the City of Sanctuary with a
commitment to resettle 20 people per year.
▪ Commissioned an Intensive Housing Support service to provide
enhanced personalised transitional housing support to homeless
households with the service already at capacity.
▪ Supported 3 refugees and 123 people from Ukraine to settle into
accommodation.
▪ Continue to deliver good outcomes for people experiencing
homelessness despite increase demand.  The length of time spent in
temporary accommodation and the overall duration of homelessness
has been maintained at a level close to our previous sector leading
performance.

Page 5

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                          5
Achievements 
Priority 3: Delivering housing for people with varying needs
In 2022-23:
▪ Invested £823,230.00 following OT assessment in 119 major and
289 minor adaptations for local authority tenants. 
▪ Supported 187 major adaptations for private tenants and
homeowners through our Care and Repair Scheme.
▪ Matched 30 referrals to various supported and bespoke
accommodation through our Independent Living Panel (ILP) for
individuals with long-term support needs.
▪ Delivered 1 refurbishment project and 1 core and cluster supported
accommodation project for individuals with a range of housing and
support needs, with built-in TEC and 24/7 staff support. 
▪ Secured funding of almost £4 million to transform our Gypsy
Traveller site with new energy-efficient accommodation and
upgrades to create a sustainable environment for residents and
support climate change ambitions. 
In 2023-24:
• Invested £724,892.40 following OT assessment in 369 minor
adaptations and 108 major adaptations for local authority tenants.
▪ Supported 191 major adaptations for private tenants and
homeowners through our Care and Repair Scheme.
▪ Carried out a review of our Occupational Therapy (OT) provision for
Council housing to support the delivery of property adaptations.
▪ Matched 52 referrals to various supported and bespoke
accommodation through our Independent Living Panel (ILP) for
individuals with long-term support needs.
▪ Delivered 1 new build core and cluster project for individuals with a
range of housing and support needs, comprising of flats, adapted
bungalows and 24/7 staff and outreach support.
▪ Continued to work collaboratively to promote the benefits of
technology within a housing setting to enable people to live
comfortably and independently in their own home including through
ongoing identification and installation of assistive technology, and
through the launch of an online interactive smart house
▪ Delivered 3 wheelchair accessible properties and 11 adapted
properties through our new build programme.
▪ Reviewed our Buyback policy to include increasing the number of
buybacks the Council will aim to purchase and to consider those
with additional bespoke and adapted needs.
▪ Continued to work with the Gypsy Traveller community to have a
better understanding of their accommodation needs, with designs
developed in partnership with residents to replace all 20 chalets on
Double Dykes and wider improvements to the site.

Page 6

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                          6
Achievements 
Priority 4: Delivering quality homes with affordable warmth, zero emissions and
SMART technology
In 2022-23:
▪ Began work to develop a Local Heat and Energy Efficiency Strategy
(LHEES) setting out energy efficiency improvements across all tenures.
▪ Increased our work with SCARF to deliver our Home Energy Advice Team
(HEAT) service, providing free and impartial energy efficiency advice to [884]
households which resulted in savings for residents, reductions in carbon
emissions and removed some residents from fuel poverty.
▪ Improved the energy efficiency of 26 properties within our existing Council
housing stock through installation of air source heat pumps and replacement
of electric storage heaters with high heating retention in 3 properties.
▪ Delivered 10 new build properties which will benefit from built-in PV panels
and 8 will also benefit from installation of hybrid gas/ASHP boilers.
▪ Assisted with advice and support of 80 enquiries through our Missing Shares
service to support homeowners with communal repairs.
In 2023-24:
▪ Undertook consultation of the first Perth and Kinross Local Heat and Energy
Efficiency Strategy (LHEES) driven by Scotland’s overarching statutory
targets for greenhouse gas emissions reduction and fuel poverty.
▪ Supported the implementation of LHEES including through establishing a
LHEES Coordination Team and securing funding for a Strategic Heat
Network Support Unit.
▪ Increased our work with SCARF to deliver our Home Energy Advice Team
(HEAT) service, providing free and impartial energy efficiency advice to 2205
households which resulted in savings for residents, reductions in carbon
emissions and removed some residents from fuel poverty.
▪ Improved the energy efficiency of 53 properties within our existing Council
housing stock through installation of air source heat pumps and replacement
of electric storage heaters with high heating retention. 
▪ Delivered 40 new build properties which all will benefit from built-in PV
panels and 22 will also benefit from installation of ‘A’ rated gas combi boilers. 
▪ RSL partners have improved the condition of existing stock through
installation of 114 PV panels and replacement of 31 electric storage heaters
with high heating retention.
▪ RSL partners have delivered 32 properties with electric storage heating and
7 with air source heat pumps.
▪ £150k invested in communal repairs for homeowners through our Missing
Shares service.
▪ Progressed with two pilot projects to incorporate net zero planning and
retrofit opportunities.
▪ Set out plans to address local authority domestic stock where abeyances or
exemptions apply to meet the Scottish Housing Quality Standard (SHQS).
▪ Delivered fibre to 65 new build properties in partnership with RSLs.

Page 7

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                          7
Priorities for 2024-2025   
Priority 1
• Accelerate delivery of our affordable housing programme of 1,050
homes over the five year LHS period, through our Strategic
Housing Investment Plan and actions to build the affordable
housing land supply.
• Increasing our buyback target to 40 for the coming year 
• Develop an Empty Homes Action Plan which targets investment in
areas where housing pressure is evidenced.
• Further embed our newly published Net Zero Carbon Design
Guide in all new build developments to implement design and
enhanced energy efficiency standards.
• Continue to support delivery of local Housing Need Assessments
and Community-led projects in rural areas.
• Make a further report on potential for Short Term Let Control
Area(s) to the relevant committee. 
Priority 2
• Continue to develop and improve tailored debt advice and welfare
assistance to households across Perth and Kinross.
• Explore potential projects to deliver key worker housing in
Northern Perthshire.
• Continue to work with partners to offer housing and support
options to refugees in response to national dispersal and
resettlement programmes.
• Increase engagement with private landlords in Perth and Kinross
to improve awareness of proposed PRS reforms and investment
regarding energy efficiency measures.

Page 8

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                          8
Priorities for 2024-2025   
Priority 3
• Update our Housing Contribution Statement
• Progress with publication of our first Mobility Strategy 
• Develop dementia-friendly design for social rented new build
developments through our Design Guide.
• Ensure planning policy, placemaking and housing investment
contribute to health and wellbeing, particularly through
development in rural areas in partnership with RSLs and HSCP.
• Implement any revised Scottish Government Housing for Varying
Needs standards through our Design Guide once published,
including a minimum of 10% of all affordable homes built to
wheelchair and adaptable standards.
• Further engagement with our Gypsy Traveller community through
face to face satisfaction survey work. 
Priority 4
• Support implementation of LHEES Delivery Plan to improve
energy efficiency across all tenures.
• Build an understanding of the current and future skills and training
requirements of the construction sector to deliver quality homes.
• Further facilitate delivery of high-speed broadband into social
housing

Page 9

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            9
LHS Outcome 1: Providing more affordable homes to support liveable and sustainable communities 
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Tayside HNDA 2022, Perth
and Kinross Housing Supply Targets 2022+, Planning Advice Note (PAN) 2/2010: Affordable Housing and Land Audits, Perth and Kinross Local
Development Plan, Scottish Planning Policy (SPP), ‘A Place to Stay, A Place to Call Home: a Strategy for the Private Rented Sector in Scotland’, Public
Health Priority, Scotland’s National Performance Network, Creating Places – A Policy Statement on Architecture and Place for Scotland, Designing Streets,
Green Infrastructure: Design and Placemaking, Planning Advice Note 77: Designing Safer Places, Community Empowerment Act 2015, Place Standard,
Town Centre First Principle, National Planning Framework 4, National Transport Strategy 2.
Action
No.
Action(s) and
Commitments for
Outcome Delivery
Baseline Indicator or
Measure Milestone Target /
End Point
Action Lead /
Coordinator
Progress 2022-2024
1.1 Deliver PKC’s
affordable housing
programme of
1,050 homes over
the next five years
800
affordable
homes
(Target in
LHS 2016-
2021) 
Urban
(53%) /
Rural (47%)
split 
Affordable
housing
completions   
Monitor the
Urban / Rural
split to ensure
representative
distribution
• Achieve an average of
210 affordable housing
completions each year
• 70% Social Rent
(735/1050)
• 30% other affordable
tenure (315/1050 -
LCHO, MMR, Self-
Build)
• Maintain 53% / 47%
split across urban and
rural areas
2027  Housing
Strategy 
(Team
Leader) 
Registered
Social
Landlords
(RSL)
2022-23: there were 220
affordable housing completions: 
New Supply 2022-23
PKC New Build 10
RSL New Build 156
Buybacks 36
Empty Homes as
reported in 1.2 18
Total 220
Tenure 
Social Rent 128
(58%)
MMR 49 (22%
LHCO 25 (11%)
Empty Homes for
MMR 18 (9%)
Total 220
Locality Split
Urban 40%
Rural 60%

Page 10

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            10
2023-24: there were 174
affordable housing completions: 
New Supply 2023-24
PKC New Build 40
RSL New Build 65
Buybacks 48
Empty Homes as
reported in 1.2 21
Total 174
Tenure 
Social Rent 141
(82%)
MMR 12 (7%)
Empty Homes for
MMR 21 (11%)
Total 174
Locality Split
Urban 36%
Rural 64% 
1.2 Develop an Empty
Homes Action
Plan which targets
investment in
areas where
housing pressure
is evidenced
Current
Empty
Homes
evidence
Current
pressure
analysis
and local
housing
systems
analysis
Number of
empty homes
brought back
into use 
• Develop evidence
base to demonstrate
areas of housing
pressure
• Consultation with
stakeholders and
partners on action plan
development
• Develop and
implement action plan
Ongoing 
2024 
2025
Tourism,
Culture and
Place   
Housing 
(Service
Manager)
2022-23:
• 82 properties (included in this
is 18 Empty Homes) brought
back into use through a variety
of grants and initiatives. 
2023-24:
• 101 properties (included in this
is 21 Empty Homes) brought
back into use through a variety
of grants and initiatives.

Page 11

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            11
1.3 Maximise the
potential to
generate more
homes through
brownfield
regeneration
which encourages
mixed
developments and
change of use for
vacant properties
Vacant and
Derelict
Land
Register
Housing
Land Audit
Number of
completions on
brownfield
regeneration
sites 
Number of
homes created
as a result of
use for vacant
properties
• Develop a register of
potential brownfield
regeneration sites
• Develop a register of
potential sites that
would be suitable as
housing subject to
change of use
• Evaluate sites in line
with SHIP criteria
• Carry out feasibility
studies as required
• Deliver 50% affordable
homes through
brownfield
regeneration and
change of use for
vacant properties 
Ongoing 
Ongoing 
2027
Planning,
Transport
and Housing
Strategy 
(Team
Leader) 
Tourism,
Culture and
Place 
Housing
Strategy
(Team
Leader)
Urban Capacity and Brownfield
Study underway with 1 pilot study
in Dunkeld completed with wider
study now progressing. 
1.4 Seek
opportunities to
deliver a wider
range of
affordable housing
options e.g.,
intermediate
housing, LCHO
and affordable
self-build etc.
Average
number of
completions
for each
tenure per
annum
Number of
homes
delivered by
each tenure 
• Carry out feasibility
studies
• Identify and develop
partnerships to deliver
wider range of
affordable housing
options
• Establish a Self-Build
Register and identify
self-build opportunities
using the Development
Management process.
• Increase range of
affordable housing
options in rural areas
working in partnership
with private estates,
Ongoing 
Ongoing 
2023 
Ongoing 
Housing
Strategy
(Kevin Divin) 
Registered
Social
Landlords 
2022-23:
• 5 HNA’s completed across
rural areas ((Mount Blair;
Dunkeld & Birnam; Aberfeldy;
Comrie)
• 63 new builds completed in
rural areas including Abernethy
as a result of £1.6m investment
from PKC and Scottish
Government. 
2023-24:
• Self-Build Register published
April 2023 with 14 expressions
of interest registered to date.
• Ongoing discussions with five
landowners / estates to date to

Page 12

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            12
landowners,
developers, funders,
and local communities
• Undertake a targeted
Housing Needs
Assessments
Programme (HNAP) in
rural settlements
where tackling a lack
of AH has been
identified as a priority
in Community Action
Plans (CAPs) 
• Work in partnership
with rural housing
specialists to enable
Community
Development Trusts to
secure subsidy from
Scottish Land Fund
(SLF) and Rural
Housing Fund (RHF),
private and other
funding sources to
develop community-
led housing projects 
• Aim to deliver, via a
community-led
approach, up to 100
new affordable homes
of various types and
tenures that reflect
HNAP outputs, to be
delivered to Design
Guide Standard over 
Ongoing 
Ongoing 
2027
increase affordable housing in
rural areas.
• Further affordable housing-led
regeneration feasibility planned
for Perth City in 2024-25.
• 6 affordable self-build plots
granted planning permission in
2023 to be progressed in 2024-
25.
• Development work progressing
with 2 further HNA’s and
community-led affordable
housing projects applications.
• Pitlochry Property Asset
Review- Rationalisation of
property assets for co-location
resulting in 3 viable affordable
housing sites for
redevelopment released within
2-3 years.
• Revised Disposal of Land and
Buildings Policy to underpin
corporate priorities for
affordable housing.

Page 13

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            13
the period of the
strategy
1.5 Continue to
develop
partnership
working to ensure
collaborative
investment
approach towards
locality leadership
and place
planning
processes through
Community Action
Plans and Local
Place Plans
Existing
community
planning
structures 
Current
partnership
projects
Collaborative
approaches to
investment
developed 
Joint projects
identified and
progressed
• Develop and
implement capacity
building opportunities
to support master
planning, delegated
decision making and
budget management
• Develop clear
definitions for lifetime
20-minute
neighbourhoods that
enable partners,
stakeholders, and
investors to pursue
placemaking which
improves connectivity
through investment in
physical, social, and
digital infrastructure
• Evaluation of existing
structures to identify
opportunities that will
empower local teams
to make a difference
within their
communities
Ongoing 
2026 
2027 
Tourism,
Culture and
Place 
Planning,
Transport
and Housing
Strategy
(Service
Manager)
In 2022-23:
• Carried out Big Place
Conversation engagement
ahead of Local Development
Plan 3 preparation, including
raising awareness of Local
Place Plans. 
In 2023-24:
• Webpage on Local Place Plans
set up and promoted, inviting
enquiries from community
bodies interested in creating a
Local Place Plan or updating a
Community Action Plan into
one.
• Collaboration with colleagues
in Rural Perth and Kinross
Community-Led Local
Development team to support
expressions of interest from
community bodies considering
preparing a Community Action
Plan or Local Place Plan,
sharing outputs of 2022/23’s
Big Place Conversation 
1.6 Embed the values
of the Perth and
Kinross Offer to
ensure investment
and commitment
across Services to
Existing
structures
and groups
Demonstrate
delivery of
Perth and
Kinross Offer
• Develop and improve
existing structures to
pursue innovation in
placemaking, master
planning, construction
2023  Housing
Strategy
(Team
Leader)
Perth and Kinross Sustainable
Inclusive Homes Net Zero Carbon
Design Guide published in
November 2023 which details
construction innovation and house
design for affordable homes.

Page 14

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            14
develop and
deliver the LHS
Action Plan
innovation and
housing design
• Develop collaborative
partnerships which test
innovation in housing
design and modern
methods of
construction 
Ongoing 
1.7 Planning policy to
be developed
through LDP3
where appropriate
for Short Term Let
(STL) control
areas
Number of
Short Term
Lets by
postcode
district and
HMA
Outcome of
analysis of
impact of STLs
on Housing
Pressures,
House Price,
PRS, ASB,
Community,
Amenities and
Facilities,
Tourism,
Economy
• Complete feasibility
study in relation to STL
Control Area
• Community
Consultation
• Local Development
Plan Policy to be
developed and
implemented where
appropriate for STL
Control Areas
2023 
2026
Planning,
Transport
and Housing
Strategy
(Service
Manager)
Preliminary feasibility study
reported to committee May 2023
and agreement for initial public
consultation granted and
undertaken June – August 2023
with research and feedback
helping to shape the non-statutory
Planning Guidance approved at
EIED Committee in November
2023 to support determination of
applications. 
Public consultation briefing and
further work scheduled for May
2024.
1.8 Pursue a pro-
active master
planning approach
to assist
development of
planning and
development
frameworks and
use powers where
necessary to
acquire land and
property
LDP2 and
Housing
Land Audit 
Master Plans in
place
• Use placemaking
principles to engage
urban and rural
landowners,
developers, and  
providers
• Identify opportunities
and adopt Master
Planning approach to
effective land supply
where appropriate
Ongoing 
Ongoing
Planning,
Transport
and Housing
Strategy
(Service
Manager) 
Estates 
A New Build Delivery Group has
been formed to identify potential
sites for affordable housing-led
redevelopment, including use of
public-sector assets, and engaging
with urban and rural landowners
and developers.

Page 15

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            15
LHS Outcome 2: Providing a range of housing options that people can easily access, afford, and keep
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Ending Homelessness
Together Action Plan, Equally Safe -Scotland’s Strategy for Preventing and Eradicating Violence Against Women and Girls and the Equally Safe Delivery
Plan, Perth and Kinross Rapid Rehousing Transition Plan, Scottish Social Housing Charter.
Action
No.
Action(s) and
Commitments for
Outcome
Delivery
Baseline Indicator or
Measure Milestone
Target /
End
Point
Action Lead /
Co-ordinator
Progress 2022-2024
2.1 Continue to
develop and
improve tailored
debt advice and
welfare
assistance to
households
across Perth and
Kinross to
maximise
financial
inclusion
Existing
services 
Number of
households
assisted
Services
Provided 
Households
assisted 
Income
generated via
assistance
• Review existing services
provided and develop
promotional opportunities
to raise awareness of
these 
2024 Welfare Rights
(Team Leader) 
Housing
(Service
Manager)
2022-23:
• Tenancy Sustainment Fund
provided 641 households
with a financial payment
toward their rent arrears
balance. The total budget
was £200K. 
• Financial Inclusion Project
delivered by CAB supported
a total of 1,013 tenants with
a financial gain for those
referred of £867,373.
• Our Think Yes budget
supported a total of 115
households with a spend of
£29,905. This £30k fund is
used by Locality Housing
Teams to provide assistance
in meeting the costs of
moving into a new home
and the one-off unexpected
costs. 
2023-24:
• Tenancy Sustainment Fund
provided 566 households

Page 16

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            16
with a financial payment
toward their rent arrears
balance. The total budget
was £215k.
• Financial Inclusion Project
delivered by CAB supported
a total of 1,891 tenants with
a financial gain for those
referred of £1,185,191.
• Our Think Yes budget
supported a total of 178
households. 
• Supported 29 households in
the PRS to sustain their
tenancies through the
Private Sector Sustainment
Fund with a spend of
£84,723. 
2.2 Develop a range
of options that
achieve a better
match of
households to
homes
Current
options
New and
improved
options
available
• Review mutual exchange
process and raise
awareness 
• Review and enhance the
tenant incentive scheme
to encourage tenants of
large properties to
downsize
2023 
2024
Housing
(Service
Manager) 
Registered
Social
Landlords
2022-23:
• A new self-serve online
Housing Options service
was launched to make it
easier for people to access
a range of housing options
and apply for housing. 
2023-24:
• Began a review and
consultation of our Common
Allocations Policy which
includes proposing a new
downsizing policy with
improved incentives to
enable better targeting of

Page 17

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            17
properties that are under-
occupied. Mutual exchange
will be promoted as a
housing option as part of the
Comm's around the revised
Common Allocations Policy.
• Further work will be
undertaken to progress key
worker housing by exploring
potential projects through
Rural Key Worker Funding.
2.3 Review existing
evidence base
and consider
feasibility of Build
to Rent models
to deliver high
quality, energy
efficient market
rent options
Existing
Build to Rent
Models
Review and
feasibility study
complete
• Complete review
• Carry out feasibility study
and evaluate findings
2024
2024
Housing
Strategy
(Team Leader)
Considered a lower priority
action as market rent options
are evidenced in the HNDA as
being less affordable to a
significant number of the
population. Review of evidence
and potential feasibility will
therefore take place later in the
LHS cycle 2025-2026.
2.4 Continue to work
with partners to
offer housing and
support options
to refugees in
response to
national dispersal
and resettlement
programmes
Existing
housing and
support
provision 
Current
national
dispersal
and
resettlement
programmes
Number of
refugees
provided with
accommodation
and support
• Continue to respond and
support requirements in
relation to national
programmes
Ongoing Housing
(Service
Manager /
Team Leader)
2022-23:
• Supported 4 refugees and
450 people from Ukraine
supported into
accommodation. 
2023-24:
• Supported 3 refugees and a
further 123 people from
Ukraine into
accommodation.
• In March 2024, Full Council
approved for Perth and
Kinross to become a local
authority member of the City
of Sanctuary organisation

Page 18

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            18
with a commitment to
resettle around 20 people
per year through UK
Government resettlement
schemes.
2.5 Enhance
personalised
transitional
housing support
to homeless
households with
moderate to high
support needs
from temporary
or supported
accommodation
to settled
housing
Existing
house
support
provision
Average
number of
households
with
moderate to
high needs
provided with
support per
annum
Model
developed 
Number of
households
assisted
• Develop and implement
model of enhanced
personalised transitional
housing support
2023 Housing
(Service
Manager) 
HSCP
Planning and
Commission-
ing (Team
Leader)
The Intensive Housing Support
service was commissioned, and
Turning Point Scotland won the
contract. The service
commenced in October 2024
and is already at capacity with
23 service-users receiving
support. 
2.6 Increase
engagement with
private landlords
to improve
awareness of
proposed Private
Rented Sector
(PRS) reforms
and funding
options that may
be available to
invest in energy
efficiency
measures in PRS
homes e.g.,
Home Energy
Current
Private
Landlord
engagement
forums and
opportunities
Information
source of
reforms and
funding
options
Number of
engagement
opportunities
provided 
Number of
landlords
supported 
Information
source
developed
• Develop and implement
framework of
engagement
opportunities for private
landlords
• Develop robust
information/knowledge
hub in relation to reforms
and funding options for
PRS homes
2024/25 
2024/25
Licensing
(License
Manager) 
Housing (Team
Leader)
Landlord Accreditation Scotland
(LAS) and Perth & Kinross
Council have an agreement
whereby LAS will deliver three
core information courses for
Perth & Kinross Council
registered landlords per year. 
In addition, a monthly newsletter
is to be created to keep
landlords up to date with new
legislation, grants available etc. 
Engagement and consultation
exercises to be carried out to
identify and explore effective
ways to consult, engage and

Page 19

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            19
Scotland, interest
free loans
seek feedback from private
landlords. 
2.7 Continue to
improve and
further develop
the Council’s
approach to
Rapid Rehousing
via the Home
First model
RRTP
(Rapid
Rehousing
Transisiton
Plan)
2019/2024
Successful
delivery of
RRTP Housing
options,
support, and
homeless
prevention
services
materials
available in
range of
accessible
formats and
channels
• Work in partnership to
deliver RRTP
• Lead role in continued
development,
implementation, and
delivery of RRTP
• Sustain or improve
performance in relation to
RRTP locally agreed
targets for;
o Number of
homeless
households
waiting for an
offer of secure
accommodation
o Average length of
stay in temporary
accommodation
o Average
homeless case
duration
• Provide communication
materials in accessible
formats to raise public
awareness of available of
housing options, support,
and homelessness
prevention services
• Review existing advice
and information
On-
going 
On-
going 
On-
going 
2024 
Housing
(Service
Manager)
2022-23:
• 19% increase in all
homeless presentations due
to the demand associated
with post-pandemic
conditions, cost of living
pressures and a reduction in
housing supply with less
new-build completions and
significantly reduced
turnover of existing stock.
• Despite ongoing challenges:
• Through Home First, we
have minimised number of
children living in temporary
accommodation and
continue to be one of the
leading authorities in
Scotland in this area. 
• We have minimised the
impact of the increase in
homeless presentations on
the average duration of
homelessness through the
continued use of targeted
prevention measures. 
• To support households to
quickly move into their new
homes, we increased our
starter and furniture packs,
spending around £50,000 of
our allocation of Scottish
Government Rapid

Page 20

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            20
• Identify communication
formats and channels
required
• Engage with
stakeholders to
understand requirements
• Develop and implement
improved materials,
formats, and channels of
communication
2024/25 
2024/25 
2024/25 
2024/25
Rehousing Transition Plan
(RRTP) funding to provide
essential goods. 
• Through our ‘Property
Ready’ and ‘Prevention’
Funds, we assisted around
300 people with essential
goods to enable them to
successfully move into their
new home. 
• 566 applicants assessed as
homeless (this follows
several years of consecutive
reductions in homeless
presentations. The number
of applicants assessed as
homeless has remained
stable with the increase
being linked to the overall
increase in presentations. 
• 43% of allocations to
homeless households in
permanent settled
accommodation 
2023/24 
• We experienced a further
15% increase in homeless
presentations in 2023/24.
This increase reflects what
is happening in society and
the pressures on the
housing system.

Page 21

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            21
• Despite the increase, we
maintained strong
performance in terms of
outcomes for people
experiencing homelessness.
• The average duration of
homelessness was 79 days.
• We had 65 households,
including 9 children, in
temporary accommodation
on 31 March 2024. The
average length of stay in
temporary accommodation
was 68 days.
• At the end of March 2024,
there were 155 live
homeless cases with 122 of
these waiting for an offer of
secure housing.
• 56% of general needs
properties were allocated to
homeless applicants.
• The strong performance
around outcomes for
homeless people despite the
increase in presentations is
an indication that our Home
First approach is working
effectively.

Page 22

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            22
LHS Outcome 3: Delivering housing for people with varying needs
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Public Health Priority,
National Health and Wellbeing Outcomes, 2022 Tayside HNDA, Good Mental Health for All, Keys to Life, Age, Home and Community –The Next Phase,
Scottish Strategy for Autism, Race Equality Action Plan, Site Standards -Scottish Government guidance on minimum sites standards and site tenants' core
rights and responsibilities, Scottish Social Housing Charter, Improving the lives of Gypsy/Travellers 2019-21, Foundations for well-being: Reconnecting
Public Health and Housing, Perth and Kinross Council Housing Contribution Statement, Perth and Kinross Health and Social Care Partnership Strategic
Plan 2019-2022 / 2020-25, Perth and Kinross Sustainable Inclusive Homes Net Zero Carbon Design Guide 2023, Perth and Kinross Care and Repair and
Scheme of Assistance.
Action
No.
Action(s) and
Commitments
for Outcome
Delivery
Baseline Indicator or Measure Milestone
Target /
End
Point
Action Lead /
Coordinator
Progress 2022-2024
3.1 Ensure
planning policy,
placemaking
and housing
investment
programmes
contribute to
improved and
sustainable
homes, outdoor
space, health,
and wellbeing
for all
households
including those
with varying
needs
Local
Development
Plan 
Number of
Care and
Repair
Services
Adaptations 
SHIP
completions 
Common
Allocations
Policy 
Delivery of SHIP
including Independent
Living projects 
Delivery Care and
Repair 
Delivery of
Adaptations 
Housing Options
advice and assistance
provided 
PKC New Build
Design Guide 
• Prepare LDP3 and
PKC Mobility Strategy
• Encourage the pre-
planning of PKC's
property adaptations
at the void stage to
enable early
management of
adaptations budgets
and programme
• Effective review,
referral, prioritisation,
and promotion of
Occupational Therapy
(OT) provision for all
tenures to support the
delivery of property
adaptations
• Review Allocation
Policy and Procedures
• Develop and
implement Dementia
2023 
2023 
2024 
2024 
2024
Housing
(Service
Manager) 
HSCP /
Independent
Living Panel 
Planning,
Transport and
Housing
Strategy
(Service
Manager) 
Housing
Strategy
(Team
Leader) 
2022-23:
• Invested £823,230.00 in
PKC Adaptations: 289
PKC Minor Adaptations
and 119 PKC Major
Adaptations
• Completed 187 major
adaptations through Care
& Repair with an annual
spend of £937,629.61 for
grant approvals.
• Carried out 2671 Housing
Options advice and
assistance interviews.
• 1 refurbishment project
lead by PKC Housing and
HSCP completed for 2
people matched through
the ILP as requiring
transitional supported
accommodation with
onsite 24/7 staff and office

Page 23

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            23
Friendly design for
social rented newbuild
developments
• Develop information,
advice, and support in
relation to provision of
housing and related
services for older
people and those with
dementia which
enhance
independence
• Engagement with
developers to
encourage more
wheelchair accessible
homes delivered
through the Private
Sector. All tenure
wheelchair (Private)
target to be
considered for LDP3
for all sites.
• Improvements to
Gypsy Traveller sites
including energy
efficiency chalets and
renewable energy
sources.
• Contribute to enabling
greater tenure choice
and avoid crisis
interventions at a later
stage by testing the 
2025 
2025 
2027 
2027 
Registered
Social
Landlords 
base, and identified TEC
installed.
• 1 new build core and
cluster project in
partnership with RSL
completed for 10 people
matched through the ILP
as requiring supported
accommodation with
onsite 24/7 staff and office
base, and identified TEC
installed. 
2023-24:
• LDP3 proceeding as
scheduled.
• Draft Mobility Strategy and
Action Plan submitted to
CC&S Committee May
2024. Public Consultation
May – July 2024. Finalised
Mobility Strategy to CC&S
committee October 2024.
• Invested £724,892.40 in
PKC Adaptations: 369
PKC Minor Adaptations
and 108 PKC Major
Adaptations
• Completed 191 major
adaptations through Care
& Repair with an annual
spend of £704,867.08 for
grant approvals.

Page 24

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            24
development of
flexible tenure models
and developing a
housing options guide
for older households
and those with
dementia 
• Carried out 2460 Housing
Options advice and
assistance interviews.
• Occupational Therapy
(OT) Review of Council
housing progressed, and
draft policy created with
consultation underway in
2024.
• 1 new build core and
cluster project in
partnership with RSL
partner Kingdom HA and
HSCP completed for 6
individuals matched
through the ILP as
requiring 24/7 supported
accommodation with TEC
and bespoke adapted
housing and staff base.
• Progressing with
completion of 1 further
refurbishment project lead
by PKC Housing and
HSCP for 4 people
matched through the ILP
as requiring supported
accommodation with
onsite 24/7 staff and office
base, and identified TEC
and communal space.
• Progressing 5 further
projects with 2 on site and
due to complete in 2025

Page 25

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            25
and 3 included in the SHIP
for 2025-26.
3.2 Continue to
improve
working
relationships,
training,
collaboration
and knowledge
exchange on
equalities,
advice and
care and
support
services to
enable
independent
living across
Perth and
Kinross 
Existing
training and
collaboration
opportunities 
Existing
knowledge
exchange 
Register of
information in
relation to
equalities,
advice and
care and
support
Number of ILP
meetings and matches 
Number of joint
training opportunities 
Information/knowledge
hub sharing 
Number of
promotional
opportunities to
highlight ILP and
Accommodation
Guide to Independent
Living
• Ensure all information
and advice is
available in accessible
formats
• Review
Accommodation
Guide to Independent
Living 
• Develop
information/knowledge
hub of information and
advice available
• Identify joint training
opportunities and
support delivery of
same
• Identify collaboration
opportunities across
equalities, care,
support, and
independent living,
carry out feasibility
studies where
appropriate and
delivery of same
where outcomes
indicate these are
required
2024 
2024 
2024 
2024 
2024
Independent
Living Panel
(ILP)
2022-23:
• ILP met 7 times and
matched 30 referrals to
various accommodation
listed below. 
• ILP and Accommodation
Guide highlighted through
2 public events. 
2023-24:
• ILP met 9 times and
matched 52 referrals to
various accommodation
listed below:
• new build
supported core and
cluster housing
• bespoke new build
housing
• refurbished
housing converted
into supported
accommodation
• mainstream
housing with
support
• ILP and Accommodation
Guide highlighted through
3 public events
3.3 Work jointly
with agencies
to ensure future
housing
Current
workforce
capacity 
Workforce capacity
increased 
• Progress core and
cluster projects
through Independent
Ongoing  Planning,
Transport and
Housing
Strategy
2022-23:
• 1 refurbishment project
lead by PKC Housing and

Page 26

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            26
developments
address
barriers to
employment
and link to
transport and
childcare
provision in the
delivery of
person-centred
care and
support
services, with a
focus on areas
of deprivation
and rural
communities 
Evidence
bases in
relation to
transport and
accessibility
issues in
remote rural
areas 5% 
Rural
communities
HSCP
Workforce
Plan 
Housing
Contribution
Statement
(HCS) 
PKC New
Build Design
Guide 
Evidence of improved
transport and
accessibility 
Increase in person-
centred care and
support in areas of
deprivation and rural
communities 
Development of
Independent Living
projects 
Implementation /
Adoption of PKC New
Build Design Guide 
Implementation of
PKC Mobility Strategy 
Living Panel which
provide additional staff
base / office space,
and explore inclusion
of other communal
spaces
• Scope, develop and
implement use of
outreach and digital
services 
• Engage HSCP and
Third Sector in
promotion of PKC
Mobility Strategy
• Update Housing
Contribution
Statement (HCS)
• Work with delivery
partners to ensure
that all new affordable
homes meet
standards set out in
4.1 External Spaces
of PKC Net Zero
Design Guide/Perth
and Kinross Standard
2023.
• Take account of
workforce capacity,
transport and
accessibility issues
and site locations in
preparation of LDP3
and 20 min 
Ongoing 
2024 
2024-25 
2027 
2027
(Service
Manager) 
Housing
Strategy
(Team
Leader) 
HSCP
(Service
Manager) 
Independent
Living Panel
(ILP) 
Transportation
and
Development
(Transport
Officer) 
Registered
Social
Landlords 
HSCP completed for 2
tenants matched through
the ILP as requiring
transitional supported
accommodation with
onsite 24/7 staff and office
base, and identified TEC
installed. 
2023-24:
• 1 new build core and
cluster project in
partnership with RSL
partner Kingdom HA and
HSCP completed for 6
individuals matched
through the ILP as
requiring 24/7 supported
accommodation with TEC
and bespoke adapted
housing and staff base.
• Progressing with
completion of 1 further
refurbishment project lead
by PKC Housing and
HSCP for 4 people
matched through the ILP
as requiring supported
accommodation with
onsite 24/7 staff and office
base and identified TEC
and communal space.
• Progressing 5 further
projects with 2 on site and
due to complete in 2025

Page 27

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            27
neighbourhood
analysis 
and 3 included in the SHIP
for 2025-26.
3.4 Continue to
work
collaboratively
to promote the
benefits,
increase
awareness and
make better
use of
technology
within a
housing setting
to enable
people to live
comfortably
and
independently
in their own
home
Current
assistive
technology in
use within
housing 
Number of
households
receiving
assistive
technology
Information/knowledge
hub in relation to
assistive technology 
Information and
advice guide
developed 
• Develop
information/knowledge
hub in relation to
assistive technology
• Consider / create
development of
‘showcase’ property to
demonstrate assistive
technology available
• Develop and promote
advice and
information guide
Ongoing 
Ongoing 
2024
HSCP TEC
(Anthony
Clark)
• See update for 3.3
• Updated data on devices
via TEC webpage and
continue to develop
interactive experience
within Smart Flat.
• Launch of interactive
online smart house 
• Regular updates provided
to carer forum.
• Attended community and
NHS events, promoting
availability and uses of
TEC currently available.
• Discussions held on
proactive approach to
support residence and
providers of residential
and sheltered
accommodation further.
3.5 All affordable
homes are built
to revised HfVN
standard and
New Build
Design Guide,
with a minimum
10% of all
affordable
homes being
built to
wheelchair and
Revised HfVN
Standards 
Affordable
Completions 
Average
wheelchair
completions
per annum 
Completions built to
revised HfVN
Standards 
Wheelchair
Completions 
Research and testing
complete
• 10% wheelchair
homes delivered
• Determine future
targets across all
particular
requirements through
collaboration with key
partners and service
users (person
centred)
• Test and research
flexible tenure models
On-
going 
On-
going 
Housing
(Service
Manager) 
Housing
Strategy
(Team
Leader) 
Registered
Social
Landlords
2022-23:
• Housing OT undertaken
83 assessments for
wheelchair and non-
wheelchair users and 16
wheelchair users
rehoused.
• 3 wheelchair completions
(RSL)
• 6 ambulant completions
(RSL)

Page 28

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            28
adaptable
standard
Existing
flexible tenure
models 
Need and
demand for
flexible tenure
models
for households with
varying needs to
create individual
housing journeys as
their needs and
circumstances change
• Implementation of
revised Housing for
Varying Needs (HfVN)
standard and New
Build Design Guide
On-
going 
2025 
2023-24:
• 3 wheelchair completions
(2 PKC & 1 RSL)
• 11 ambulant completions
(3 PKC & 8 RSL)
• Housing OT undertaken
77 assessments for
wheelchair users and 29
people have been
rehoused into Council (7)
and RSL (10) housing.
• Ongoing forecasting
exercise with Housing and
HSCP to determine level
of need, including targets.
• PKC submitted a response
to the Scottish
Government Housing for
Varying Needs (HfVN)
Proposed Guidance
Consultation (extended to
Dec 2023), PKC will plan
to adopt new guidance
subject to further revisions
and publication TBC. 
3.6 Consider
widening the
Buyback
Scheme to
purchase
‘particular /
adaptable
homes’ for
households
Number of
households
whose needs
are currently
unable to be
met
Number of properties
purchased to meet
identified need 
Number of households
receiving ‘particular /
adaptable homes’ that
meets their needs
• Review scope of
Open Market
Purchase Scheme to
include purchases of
’particular / adaptable
homes’ which are
non-ex-Council
properties
2023 
2024
Housing
(Service
Manager)
One specific property was
purchased to meet the needs
of an individual identified by
HSCP with complex needs.
However, following a change
in the client’s support needs,
the property was deemed
unsuitable. The property has

Page 29

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            29
with varying
needs to
ensure existing
adapted
properties are
matched to
households
with specific
requirements
• Identify existing
adapted properties on
open market for sale
• Identify existing
private sector
properties with
adaptations
• Identify number and
location of households
whose needs cannot
be met through
existing social rented
stock or by an in-situ
solution 
2024 
2024
been let to a mainstream
tenant. 
The buyback policy is being
reviewed to provide some
flexibility to purchase
properties that are not ex-
council to increase capacity to
meet the housing needs of
those with varying needs. 
3.7 Work with
Gypsy/Traveller
community
members to
have a better
understanding
of their
accommodation
needs and
preferences
and explore
and develop
workable
solutions
HNDA
Specialist
Provision
Chapter 
Scottish
Government
GT Count 
Local
authority GT
Information
(LA Sites,
Unauthorised
Encampments
etc) 
Forthcoming
Gypsy
Number of
engagement
opportunities 
Improved
understanding of
needs and
preferences 
Workable solutions in
place
Update the Gypsy
Traveller Action Plan:
• Continue to develop
engagement
opportunities with GT
community
• Organise engagement
events/surveys
• Scope out
accommodation
needs and
preferences along
with solutions
• Pilot delivery of
proposed solutions
where feasible
• Pursue the
establishment of a
transient site for
Gypsy Travellers
2023 
Ongoing 
Ongoing 
2024 
2024-27 
2027 
Housing
(Service
Manager) 
Environmental
Health
(Principal
Officer) 
Equalities
(Team
Leader)
2022-23:
• In January 2023, funding
of almost £4 million was
secured to transform a
local permanent Gypsy /
Traveller site near Perth,
with new energy-efficient
accommodation and
upgrades to support
climate change ambitions
and create a sustainable
environment for residents.
Work is due to commence
on site in early 2024. 
2023-24:
• We continued to support
both Gypsy Traveller Sites
at Bobbin Mill and Double
Dykes.

Page 30

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            30
Traveller
Action Plan
• Contractor appointed for
the replacement of all 20
chalets on Double Dykes
and wider improvements
to the layout and
environment within the
site. Design specifications
for chalets have been
developed in partnership
with residents.
• Work is due to commence
late Summer / Early
Autumn 2024. 
• We are leading on the
development of a transient
site to address concerns
with lack of suitable
pitches. A site has been
identified and work is
progressing through a
partnership Board to
progress the development
and build. 
• Our Lead Housing Officer
for Gypsy Travellers is
part of the wider Equalities
Board. 
• Plans are in place to
undertake further face to
face satisfaction surveys
with residents on both our
sites, including the general
Gypsy/Traveller
community to seek

Page 31

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            31
feedback on the transient
site. 
• Staff training and
awareness on the
Gypsy/Traveller
community provided to
over 50 staff. 
3.8 Continue to
improve PKC's
central housing
database (NEC
Housing) with
information of
all existing
property
adaptations
and
accessibility
features to
maximise the
use of limited
resources and
match suitable
properties to
appropriate
households
NEC Housing
Property
Information
Improved intelligence
gathering and
reporting via NEC
Housing
• Continue to gather
intelligence and
populate NEC
Housing with existing
property adaptations
and accessibility
features
• Enhance processes
and procedures to
ensure that the
allocation of
properties takes
account of system-
based intelligence
about adaptations and
accessibility features
Ongoing 
2024
Performance
and Business
(Team
Leader) 
Housing
(Team
Leader)  
IT are progressing a solution
to allow the information
gathered by the Housing OT
in relation to properties which
are considered suitable (and
unsuitable) for adaptation to
be uploaded to NEC. The aim
is that this will allow for
consideration during allocation
where properties are suitable
for adaptation and better
target properties to those
applicants with particular
needs.

Page 32

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            32
LHS Outcome 4: Delivering quality homes with affordable warmth, zero emissions and SMART Technology
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Local Heat and Energy
Efficiency Strategies (LHEES), Sustainable Housing: Fuel Poverty and Climate Change Advice Note, Scottish Government’s Energy Efficient Scotland
Route Map, Fuel Poverty (Targets, Definition, and Strategy) (Scotland) Act 2019, Climate Action Plan (December 2021), Scottish Housing Quality
Standard, Energy Efficiency Standard for Social Housing, Scottish Social Housing Charter, Scottish House Condition Survey, Local House Condition
Survey (Council Sector).
Action
No.
Action(s) and
Commitments
for Outcome
Delivery
Baseline Indicator or Measure Milestone
Target /
End
Point
Action Lead /
Co-ordinator
Progress 2022-2024
4.1 Support
implementatio
n of Perth and
Kinross Local
Heat and
Energy
Efficiency
Strategy
(LHEES) 
Current
Projects 
LHEES
Delivery Plan 
Energy
Efficiency of
Council
housing stock 
Energy
Efficiency of
PRS
Properties 
Current
funding
opportunities
Delivery of Actions
within LHEES
Delivery Plan 
• LHEES Delivery Plan
Developed
• Work in partnership to
deliver identified
projects and contribute
to delivery and
implementation of
LHEES Delivery Plan 
• Improving energy
efficiency across all
tenures by maximising
the use of national
funding programmes
2023 
Ongoing 
Ongoing
Climate
Change and
Sustainable
Development
(Team
Leader) 
• Undertook consultation of
LHEES in October 2023 
• LHEES Strategy and
Delivery Plan approved
by Climate Change and
Sustainability Committee
November 2023 and
submitted for Scottish
Government Review
December 2023. 
• Review feedback being
actioned and due for
publishing May 2024.
• LHEES Coordination
Team established and in
progress of assigning
leads to Delivery Plan
actions. 
• PKC successful in
achieving fund to take
various actions forward
including Strategic Heat
Network Support Unit

Page 33

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            33
funding Perth City Wide
HN and Commercial
Delivery models and IUK
Pathfinder funding to for
Social Housing Retrofit
and Rural Transport.
• Local House Condition
Surveys completed for
Council and Private
Sector.
4.2 Expand
capacity of
energy and
fuel poverty
advice
services and
improve
availability of
information on
fuel poverty
and energy
efficiency
measures
available to
front line staff,
service
providers and
to households
most in need
Current
information on
support
services/sign
posting in
relation to
energy
efficiency and
property
condition
Current
supports in
relation to
energy
efficiency and
property
condition
Number of
households
currently
accessing
information
Improved information
and advice 
Accessibility, format
and channels for
advice and
information 
Number of
households accessing
information and
advice 
• Target advice and
support for landlords
on how to access
sources of funding
combined with
enforcement of the
new standards when
they come in 
• Target income
maximisation and fuel
poverty support to
households living in
PRS 
• Deliver heating and
energy efficiency
advice and support
directly and through
partners as aligned
with the LHEES
• Explore existing data
and insight to develop
a risk framework to
households who are
financially vulnerable
Ongoing 
Ongoing 
Ongoing 
Ongoing 
Housing
(Service
Manager /
Team
Leader) 
SCARF 
The HEAT
Project 
Energy
Advice
Network 
Child Poverty
(Project
Officer) 
Data
Services
(Team
Leader) 
Number of P&K households
provided with energy
efficiency and/or low carbon
heating advice (PKC funded
– HEAT or SCARF) in: 
• 2022-23: 884 
• 2023-24: 2205 
This has resulted in savings
for residents, reductions in
carbon emissions and
removed some residents
from fuel poverty.

Page 34

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            34
and offer appropriate
support 
• Develop process to
record number of
households accessing
information and advice 
2024 
4.3 Build an
understanding
of the current
and future
skills and
training
requirements
to “green” the
construction
sector to
ensure we can
deliver quality
homes with
affordable
warmth, zero
emissions and
SMART
technology. 
Work in
partnership
with the CITB,
local
construction
companies
and training
providers
including Perth
UHI to ensure
To be
developed
To be developed • A number of studies
are underway at a
national and regional
level to review the
Green Skills
opportunity and to
define what is required
for various sectors
including construction.
Once these have
reported and further
analysis has been
undertaken at a local
level more milestones
can be determined.
Ongoing
/ 2027
Employability
(Service
Manager) 
Housing
(Service
Manager) 
Registered
Social
Landlords 
Housing
Strategy
(Team
Leader) 
Climate
Change and
Sustainable
Development
(Team
Leader)
2022-23:
Housing (Property) Capital
Projects & New Builds Team
have:
• installed 26 air source
heat pumps within
existing housing stock
• 3 properties from the
existing stock had old
electric storage heaters
replaced with high heat
retention Dimplex storage
heating
• 10 new properties built at
Sandilands Grove,
Abernethy with PV panels
integrated into roof and 8
of the properties had a
new hybrid gas/ASHP
boiler installed where the
LPG element is used for
the hot water heating and
the ASHP is used for the
space heating of the
properties. 
2023-24:
Innovate UK Pathfinders
funding secured to look at

Page 35

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            35
Perth and
Kinross is well
placed to
provide
appropriate re-
skilling and
training
opportunities.
revitalising home through
retrofit. Green skills across
region will be mapped, gaps
identified, a trusted traders
network and framework
established with a ready-to-
invest business model
created for retrofit to
encourage more training/up-
skilling locally in this market.
Works are being undertaken
in partnership with Nicki
Souter Associates, HEAT
Project and University of
Edinburgh. The project will
also look at rural transport,
with the total awarded for
both projects at £150k. 
A set of actions identified
LHEES Delivery Plan -
Developing green skills and
the capacity of the supply
chain (3.9 -3.12) cross
reference with this work. 
Housing (Property) Capital
Projects & New Builds team
will be involved in providing
support and assistance
where possible to Climate
Change team in relation to
delivery of retrofit business
model through contacts with
contractors carrying out

Page 36

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            36
similar work, through data
provision and integration with
other parts of the service we
deliver. 
Housing (Property) Capital
Projects & New Builds Team
have: 
• installed 18 air source
heat pumps within
existing housing stock 
• replaced old electric
storage heaters in 35
properties with high heat
retention Dimplex storage
heating.
• had 18 flatted properties
(two blocks of 9
properties) built at
Fairfield, Perth with both
having PV panels
integrated into roof
construction to assist in
supporting landlord
electrical supplies for
communal areas. 
• fitted 22 new build
properties constructed at
Methven with 'A' rated
gas combi boilers and all
units have low profile roof
integrated PV panels on
roof of property.

Page 37

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            37
RSL partners have:
• built 7 properties with air
source heat pumps
• built 32 properties with
electric storage heating
• installed 114 PV panels
on existing stock
• replaced old electric
storage heaters with high
heating retention in 31
properties 
4.4 Target
investment to
homes based
on evidence
and
intelligence
gathered 
Identify
existing
information
(Home
Analytics,
SHQS sources
and
information
provided)
Forthcoming
Information sources
identified (LHCS,
Housing IoT data,
2022 Census, Cold
Home App data, etc.) 
Improved intelligence
(Gypsy/Traveller
Consultation, energy
advisors intelligence
etc.)
• Identify and quantify
existing information
sources
• Integrate existing and
forthcoming
information sources
• Improve understanding
of intelligence
available, identify gaps
and solutions to
address these
• Develop a delivery
framework, integrating
the outputs of the Risk
framework in Action
4.2
• Wider policy review
update to map national
and local policies,
targets and strategies
that are linked to,
impact, or could be
impacted by LHS
2023 
2023 
2023 
2023 
2023 
Housing
(Service
Manager) 
Climate
Change and
Sustainable
Development
(Team
Leader) 
Policy and Strategy Review
complete and to be published
as part of LHEES Strategy
(Spring 2024). LHEES
Strategy and Delivery Plan
evidence including energy
efficiency and heat
decarbonisation pathways
(building level and zones),
heat network zones and
wider Local Area Energy Plan
evidence (transport, energy
supply and transmission,
storage etc) to be migrated to
the SSEN Local Energy Net
Zero Accelerator (LENZA)
platform for strategic net zero
pathway planning, strategic
investment alignment and
project delivery, Data
publishing plan to Corporate
systems to be developed and

Page 38

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            38
(including LHEES,
Smart Local Energy
Systems (SLES),
Local Development
Plan (LDP), Local Area
Energy Plans (LAEP)
etc
• Align evidence
underlying these
policies to support
policy integration and
delivery 
2023
reported on to next Data
Steering Group. 
Ongoing engagement with
ARUP as part of an extension
to LHEES strategy work to
review domestic and non-
domestic buildings and
propose pathways towards
reaching net zero. Initial
report anticipated July 2024.
For domestic properties,
there has been more detail
requested to allow a scoring
matrix to be developed for
evaluating which properties
need to be targeted and in
what order. 
4.5 Undertake a
review of the
Council’s
Scheme of
Assistance for
private
homeowners
considering
legislative
changes
Scheme of
Assistance 
Number of
households
assisted
annually 
Average
Annual Spend
Scheme of Assistance
Reviewed 
Number of
households assisted 
Annual Spend
• Review Scheme of
Assistance 
2024 Housing
(Service
Manager) 
Environment
al Health
(Principal
Officer) 
Missing
Shares
Officer 
2022-23:
• Missing Shares service
received 80 enquiries
which were supported
through advice (paid for
in 2023-24). 
2023-24:
• Missing Shares service
invested £150k (approved
and expected
applications) in
communal repairs.
4.6 Build new
affordable
housing to
enhanced
Newbuild
completions
(SR and
Private)
Newbuild completions
(SR and Private)
Increase in newbuild
completions to Gold
• Implement Design
Guide to ensure all
new affordable
2023/24  Housing
(Service
Manager) 
Perth and Kinross
Sustainable Inclusive Homes
Net Zero Carbon Design
Guide published in November

Page 39

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            39
energy
efficiency
standards and
encourage
private
developers to
do so too
Newbuild
completions to
Gold Standard
(SR and
private)
LDP
Standard (SR and
private)
housing meet Gold
Standard 
• Ensure Design Guide
continues to meet SG
guidance on
sustainability
standards and
principles 
2027 
Housing
Strategy
(Team
Leader)
2023 which details
construction innovation and
house design for affordable
homes and will be utilised
when engaging on new build
projects with contractors
going forwards.
4.7 Work with
Scottish
Government
and other
agencies to
improve digital
infrastructure
particularly in
rural
communities
Existing digital
connectivity
across rural
communities 
Increased number of
rural households
digitally connected
• Explore digital
infrastructure
opportunities in rural
communities
Ongoing Community
Planning
(Team
Leader) 
Economic
Development
(Team
Leader) 
Housing
(Service
Manager)
The Council has completed
the Local Full Fibre Network
(LFFN) project connecting
136 of its own buildings
(many in rural areas) to
gigabit capable full fibre. It is
also currently employing 2
Digital Engagement Officers
to work across the Tay Cities
area to connect mainly rural
premises to full fibre using
the Scottish Broadband
Voucher Scheme.
4.8 Take action to
ensure that
housing is
resilient to the
possible
effects of
climate change
and flooding
and makes a
positive
contribution to
reducing the
risks and
impacts of
Existing flood
and climate
change
position within
PKC
Risk assessment of
flooding and climate
change in relation to
Housing complete
Mitigations identified
and action plan
developed
• Understand existing
flood and climate
change risks
• Identify mitigations and
develop and
implement action plan
• Ensure Design Guide
continues to reflect
ongoing challenges as
a result of climate
change
Ongoing 
Ongoing 
Ongoing 
Structures
and Flooding
(Service
Manager) 
Housing
(Service
Manager) 
Scottish
Flood Forum
171 Council tenancies now
have flood alerts added to the
housing system with
properties receiving a
number of flood prevention
measures including the
installation of flood/air bricks
and will be contacted as a
priority in the event of
adverse weather or a flood
risk.
Work continues with Scottish
Flood Forum to review
options and proposals for

Page 40

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            40
flooding and
climate change
in the longer
term.
flood mitigation measures in
two areas of Perth (Gray
Street/Cavendish Avenue
and Murray Crescent); PKC
Structures & Flooding team
addressing issues with
culvert at Greenbank
Crescent, Glenfarg; PKC
Property team addressing
issues with ongoing
drainage/run off in Errol
adjacent to school and social
housing. 
4.9 Develop and
deliver
exemplar pilot
projects that
incorporate net
zero planning
across a range
of sectors
including fabric
first, retro
fitting and
transport
planning etc. 
Identify potential
partners and projects
Pilot exemplar
projects
• Identify potential
partners and projects
• Explore feasibility of
potential projects
• Pilot feasible projects
and evaluate findings
Ongoing 
Ongoing 
2024-27
Housing
(Service
Manager) 
Housing
Strategy
(Team
Leader)
Pilot projects to install LIND
battery system and to
investigate retrofit
opportunities in test blocks of
properties at Glengarry Road
and Colville House is
ongoing. CAN DO funding bid
with Scottish Enterprise was
successful for first phase of
work to develop opportunities
at Colville House. The
feasibility aspect is in
development. 
IOT sensors are being
installed as part of a pilot
project using iOpt sensors in
conjunction with IT. IOT
sensor installation
programme is being
progressed with interested
tenants in the multi-storey

Page 41

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            41
blocks as part of the Multi-
Storeys strategy work that is
being undertaken. This
allows the properties to have
data gathered prior to retrofit
work being carried out and
then following the work and a
comparison to be made. Data
from the sensors across both
schemes is being used to
inform and assist with
enquiries in relation to damp,
mould, and condensation
with existing tenants. 
4.10 Set out plans
to address any
local authority
domestic stock
where
abeyances
(delayed works
due to human
or social
factors) or
exemptions
are applied, to
meet the
Scottish
Housing
Quality
Standard
(SHQS) 
SHQS
Performance
2021/22
Existing
abeyances
Existing
exemptions 
Improved SHQS
Performance 
Reduction in
abeyances 
Reduction in
exemptions 
• Develop and
implement plan for
addressing SHQS
abeyances (for social
reasons) and
exemptions (subject to
technical,
disproportionate cost
or legal reasons) in
Council stock
Ongoing Housing
(Service
Manager) 
Registered
Social
Landlords
SHQS abeyances and
exemptions lists from our
database have been
extracted and broken down
into areas based on elements
within individual properties;
work to address abeyances
and exemptions will be
reviewed under each element
and plans put in place to
implement contracts to
address these. 
Energy Efficiency related
abeyances have already
been categorised and those
properties in EPC Bands E &
F are being targeted for
measures; work is ongoing
with tenants who have not

Page 42

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            42
agreed to measures in the
past however challenges
remain. 
Work is underway to appoint
a consultant to carry out a
20% Stock Condition Survey
every year for next 5 years to
inform our capital programme
and move to a proactive
approach to repairs and
housing improvement
management. 
4.11 Use the
learning from
the existing
Internet of
Things (IOT)
pilot
‘Monitoring
temperature
humidity and
CO2 in 50
homes to help
tenants
manage their
energy, reduce
fuel poverty
and maintain
their homes
well’ with a
view to scale it
up.
Pilot learning
collated
Scaled-up Plan
developed
• Scaled-up plan
approved
• Scaled-up plan
implemented
2024 
2026
Housing
(Service
Manager) 
Tenant
Liaison
Officer 
The initial 12-month Housing
IoT Project funded from HRA,
and European Regional
Development Funding has
been completed and project
extended for a further 12
months. To date a total of
144 tenancies, have iOpt
environmental sensors
installed measuring
temperature, CO2 and
humidity. This is closely
monitored and is allowing us
to support tenants with
signposting to housing
support and external
agencies e.g. HEAT, SCARF.
Assistance can also be
provided to address fuel
poverty and any repairs or
upgrades to ensure air quality
is maintained at optimum

Page 43

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                                                                                                            43
levels to support the health of
our properties and our
tenants. Additional funding
was agreed as part of the
24/25 rent setting process to
purchase sensors for a
further 250 tenancies -
installation of these has
already commenced. Positive
feedback has been received
for this project which links
closely with our existing
processes and procedures in
relation to condensation,
related mould growth and
damp. 
4.12 Facilitate the
delivery of low-
cost, high-
speed
broadband into
social housing
in partnership
with the private
sector and
investors using
fibre
infrastructure
roll-out. 
TBD % of social housing
with access to gigabit-
capable broadband
• 10% of social housing
by
• 25% of social housing
by 
• 50% of social housing
by
• 60% of social housing
by
2024 
2025 
2026 
2027
Economic
Development
(Team
Leader) 
Registered
Social
Landlords
2023-24:
• 65 new build homes
delivered by 2 RSL
partners (Kingdom HA &
Caledonia HA) have been
built with fibre to the
premises.
• Working with Internet
Service Providers (ISP) to
encourage further
investment in social
housing using private
funding and Scottish
Broadband Vouchers and
development of a pilot
project for broadband and
Internet of Things (IoT)
with a local ISP.

Page 44

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                              44
Glossary 
Acronym / Word
/ Term
Definition / Meaning
Accessible
home
Home with additional, non-standard features that meets the needs of
the occupier.
Affordable
home /
Affordable
housing
Scotland’s fourth National Planning Framework defines this as “Good
quality homes that are affordable to people on low incomes. This can
include social rented, mid-market rented, shared-ownership, shared
equity, housing sold at discount (including plots for self-build), self-build
plots and low-cost housing without subsidy.”
Affordability Rents are considered to be affordable if a household pays no more
than 25%-35% of their income on housing costs
AHP Affordable Housing Programme
AHSP Affordable Housing Supply Programme
Ambulant Non-wheelchair adapted housing for people with disabilities
ARC Annual Return on the Charter
ASB Anti-Social Behaviour
ASHP Air Source Heat Pump
Below Market
Housing
Property where the market rent is below the average market rent for the
size and location
Brownfield Defined by the Environmental Protection Agency as “a property, the
expansion, redevelopment, or reuse of which may be complicated by
the presence or potential presence of a hazardous substance,
pollutant, or contaminant.” The term typically describes areas of land
that were once used for commercial or industrial purposes such as
factories and warehouses.
CAB Citizens Advice Bureau
CAP Common Allocations Policy
CHR Common Housing Register
CLH Community Led Housing Projects are where the following three
characteristics are in place: 1) Open, meaningful, community
participation and consent takes place throughout the process 2. The
community groups owns, manages, or stewards the homes in
whichever way they decide 3) The housing development is of true
benefit either for the local community, a specific group of people (an
intentional community), or both. These benefits should be legally
protected in perpetuity.
CC&S Climate Change & Sustainability Committee
Complex Needs As defined by the Scottish Government ‘Coming Home’ Report 2018,
this is used to refer to people with learning disabilities who also have
one or more of the following:
• Severe challenging behaviour (it is noted that this may include
behaviour, which is not severe in itself, but becomes severe due to
its high frequency)
• Forensic support needs
• Mental health needs
• Autism
• Profound and multiple disabilities 
Core and
Cluster 
Typically, a cluster of 6 to 8 homes for people with independent living
needs with a core staff based providing 24/7 shared support.

Page 45

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                              45
Acronym / Word
/ Term
Definition / Meaning
COSLA Convention of Scottish Local Authorities
CPP Community Planning Partnership
EBI Estate-Based Initiatives
E&I Environment & Infrastructure Committee 
EESSH Energy Efficiency Standard for Social Housing
EHI Empty Homes Initiative
EPC Energy Performance Certificate
EqIA Equalities Impact Assessment
EST Energy Savings Trust
FIT Feed In Tariff
Floating
Housing
Support
services
A short-term, flexible, responsive service aimed at enabling vulnerable
individuals who are at potential risk of losing their tenancy to live
independently or to maximise their independence.
GIRFEC Getting it Right for Every Child
Greenfield A greenfield site is an undeveloped land that can be used for
commercial or residential development.
G/T Gypsy/Traveller 
HAG Housing Association Grant
HCS Housing Contribution Statement
HEAT Home Energy Advice Team commissioned by PKC and provided by
SCARF
HEEPS-ABS Home Energy Efficiency Programmes Scotland - Area-Based Scheme
HES Home Energy Scotland
HfVN Housing for Varying Need
HHCRO Home Heating Cost Reduction Obligation
HIBS Heat in Buildings Strategy
HLR Housing Land Requirement
HMA Housing Market Area
HMO House in Multiple Occupation
HNA Housing Needs Assessment 
HNAP Housing Needs Assessment Plan
HNDA Housing Need and Demand Assessment
Home First
model
In Perth and Kinross, Home First provides a settled home as a first
response when homelessness occurs with the aim of minimising the
impact of homelessness for individuals and families, avoiding the
stigma, cost, and uncertainty of temporary accommodation where
possible. See Advice for people who are or become homeless - Perth
and Kinross Council (pkc.gov.uk)
HfVNs Housing for Varying Needs
HOSA Housing Options Self-Assessment Tool
Housing Stock The total number of houses and flats in an area.
HRA Housing Revenue Account
HSCP Health and Social Care Partnership

Page 46

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                              46
Acronym / Word
/ Term
Definition / Meaning
HST The Housing Supply Target is a policy view of the number of homes
PKC has agreed will be delivered in each housing market area over the
periods of the Local Development Plan and the Local Housing Strategy.
It considers wider economic, social, and environmental factors, issues
of capacity, resources, and deliverability.
ILP Perth and Kinross Independent Living Panel
IOT Internet of Things
Intermediate
Housing
Refers to privately rented housing that is below the cost of market
rented housing but above the cost of housing for social rent.
Sometimes called mid-market rent or below market rent.
LA Local Authority 
LAEP Local Area Energy Plans
LAS Landlord Accreditationn Scotland 
LCHO Low Cost Home Ownership
LDP (2 or 3) Local Development Plan
Learning
Disability
The keys to life explains this is a significant lifelong condition which is
present prior to the age of 18 and which has a significant effect on a
person’s development. People with a learning disability will need more
support than their peers to:
• Understand information
• Learning skills and
• Lead independent lives
LENZA Local Energy Net Zero Accelerator 
LFFN Local Full Fibre Network
LHA Local Housing Allowance
LHCS Local House Condition Survey
LHEES Local Housing Energy Efficiency Scheme
LHS Local Housing Strategy
LPG Liquefied Petroleum Gas 
Mainstream
Housing
General needs housing is housing with no adaptations or particular
features and can be of various sizes and types.
MAPPA Multi-Agency Public Protection Arrangements
Market Housing Housing in a community which has rent or payment at a rate at or near
Average Market Rent
Missing Share Local authorities have the power to pay 'missing shares' when 1) one or
more owners are unwilling or unable to pay 2) the owner cannot be
found after reasonable enquiries 3) it is unreasonable to ask an owner
to pay where a minority of owners do not pay their share of common
repairs
MMR Mid-Market Rent
NEC Northgate systems software – housing management system
OT Occupational Therapy
Out of Area This is when a person with support needs is living within a placement
that is not within their own funding authority and could include living in
either an NHS or private hospital.

Page 47

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                              47
Acronym / Word
/ Term
Definition / Meaning
Owner-occupied Property which is lived in by people who have bought it rather than
people who pay rent
Perth UHI Perth University Highland and Islands
PRS Private Rented Sector
RHF Rural Housing Fund
RHI Renewable Heat Incentive
RRTP Rapid Rehousing Transition Plan
RSL Registered Social Landlord (Housing Association)
RTO Registered Tenant Organisation
SCARF Save Cash and Reduce Fuel
SDP Strategic Development Plan
SDS Self-Directed Support
Self-Build Homes built or commissioned by individuals or groups of individuals for
their own use. Homes built this way, offer a unique alternative to
standard market housing, and offer the opportunity to create innovative,
greener, and more affordable homes than currently offered through
standard housing options.
SG Scottish Government
SGN Scottish Gas Networks
SHCS Scottish House Condition Survey 
SHIP Strategic Housing Investment Plan
SHQS Scottish Housing Quality Standard. The SHQS was introduced in 2004
and is the main way to measure housing quality in the social rented
sector. It is the minimum standard which all social rented properties
must meet
SHR Scottish Housing Regulator
Shared Equity A type of housing tenure where ownership is shared between the
occupier and a third party, usually a council or Scottish Government
SLES Smart Local Energy Systems
SLF Scottish Land Fund
SMART
technology
Self-Monitoring, Analysis, and Reporting Technology include sensors
and devices, systems and applications that use WiFi and technology to
help support with a range of housing related services which can range
from everyday practical tasks, independent living, and ensuring the
home environment is energy efficient. 
Social Housing Properties provided by local authorities or Housing Associations which
are more affordable than housing on the open market.
SR Social Rent
STLs Short Term Lets
Supported
Housing
This is an umbrella term used to describe a wide range of housing-
based options for people with support needs. See Accommodation
Guide to Independent Living for more info.
TEC Technology Enabled Care

Page 48

Perth and Kinross LHS Annual Progress Report 2022-2024 June 2024                              48
Acronym / Word
/ Term
Definition / Meaning
Tenure Refers to legal method of housing ownership and occupation, for
example, owner occupied, private rented, below market rent, shared
equity, social rent, shared ownership. ‘All tenure’ refers to all housing
assets across the tenure categories listed above
VAWP Perth and Kinross Violence Against Women Partnership