Agenda Document Pack - Housing and Social Wellbeing Committee - 30/09/2026

Perth and Kinross Council · 30 September 2026
Back to Housing and Social Wellbeing Committee — 30 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
23/09/2026 
A hybrid meeting of the Housing and Social Wellbeing Committee will be held in
the Council Chamber on Wednesday, 30 September 2026 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Tom McEwan (Convener)
Councillor Sheila McCole (Vice-Convener)
Bailie Mike Williamson (Vice-Convener)
Bailie Chris Ahern
Councillor Peter Barrett
Councillor Bob Brawn
Bailie Rhona Brock
Councillor Angus Forbes
Councillor Ian James
Councillor Iain MacPherson
Councillor Carol Mair
Bailie Claire McLaren
Councillor Frank Smith
Councillor Colin Stewart
Councillor Jack Welch
Page 1 of 140

Page 2

Page 2 of 140

Page 3

Housing and Social Wellbeing Committee 
Wednesday, 30 September 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF HOUSING AND SOCIAL WELLBEING
COMMITTEE OF 3 JUNE 2026 FOR APPROVAL
(copy herewith) 
5 - 6 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 26/262) 
7 - 10 
5 ANTISOCIAL BEHAVIOUR IN PERTH AND KINROSS
Presentation by Inspector S Gray (Police Scotland) 
6 ANNUAL UPDATE ON PERTH AND KINROSS LOCAL HOUSING
STRATEGY 2022-2027
Report by Strategic Lead - Housing and Communities and Strategic
Lead - Economy, Development and Planning (copy herewith
26/263) 
11 - 70 
7 STRATEGIC HOUSING INVESTMENT PLAN 2026/27 - 2030/31
Report by Strategic Lead - Economy, Development and Planning
and Strategic Lead - Housing and Communities (copy herewith
26/264) 
71 - 114 
8 ANNUAL ASSURANCE STATEMENT 2025/2026 - SCOTTISH
HOUSING REGULATOR
Report by Strategic Lead - Housing and Communities (copy
herewith 26/265) 
115 - 130 
9 INVESTING IN COMMUNITIES FUND
Report by Strategic Lead - Housing and Communities (copy
herewith 26/266) 
131 - 140 
Page 3 of 140

Page 4

Page 4 of 140

Page 5

HOUSING AND SOCIAL WELLBEING COMMITTEE 
Minute of hybrid meeting of the Housing and Social Wellbeing Committee held in the
Council Chambers, 2 High Street, Perth, on 3 June 2026 at 09.30am. 
Present: Bailies C Ahern, R Brock, C McLaren and M Williamson, Councillors L
Barrett (substituting for Councillor P Barrett), B Brawn, A Forbes, I James, G Laing
(substituting for Councillor J Welch), I MacPherson, C Mair, S McCole, T McEwan, F
Smith, C Stewart and J Welch. 
In Attendance: C Mailer, Depute Chief Executive, H Hope, S Skene, D Stokoe and S
Kimmet (all Housing and Communities), S Hendry, J Guild, A Brown and M
Pasternak (all Legal and Governance). 
Also in Attendance: Group Commander S Kabamba, Area Commander B Todd
(SFRS), Chief Inspector J Allen, Inspector S Gray (Police Scotland) (all up to Item 7). 
Apologies: Councillors P Barrett and J Welch. 
Councillor T McEwan, Convener, Presiding. 
1. Welcome and Apologies 
Councillor T McEwan welcomed everyone to the meeting. Apologies were
noted as above. 
2. Declarations of Interest 
There were no Declaration of Interests in terms of the Councillors’ Code of
Conduct. 
3. Minute of Previous Meeting 
The minute of the meeting of the Housing and Social Wellbeing Committee of
25 March 2026 was submitted and approved as a correct record. 
4. Outstanding Business Statement 
The Outstanding Business Statement was noted. 
5. Scottish Fire and Rescue End of Year Performance Report – 1 April 2025
to 31 March 2026 
There was submitted a report by Scottish Fire and Rescue Service (26/161)
providing information to the Committee regarding the performance of the Scottish
Fire and Rescue Service for the period of 1 April 2025 to 31 March 2026, to facilitate
local scrutiny. 
Area Commander B Todd and Group Commander S Kabamba provided a
3
Page 5 of 140

Page 6

brief introduction to the report and answered Members’ questions thereon. 
Resolved: 
The content of report 26/161, be noted. 
6. Perth and Kinross Local Policing End of Year Police Report – 1 April
2025 to 31 March 2026 
There was submitted a report by Chief Superintendent, Police Scotland, D
Division (Tayside) (26/162) providing information to the Committee regarding the
performance of Police Scotland for the period of 1 April 2025 to 31 March 2026, to
facilitate local scrutiny. 
Chief Inspector J Allen and Inspector S Gray provided a brief introduction to
the report and answered Members’ questions thereon. 
During questioning, a commitment was given by Police Scotland and
Councillor T McEwan as Convener, to engage in further discussion regarding the
potential of a joint approach to extending the provision of Police presence in Perth
City Centre to tackle anti-social behaviour. 
Resolved:
The content of report 26/162, be noted. 
(There followed a short recess and the meeting reconvened at 11:28am). 
7. Community Empowerment Annual Report 
There was submitted a report by Strategic Lead – Housing and Communities
(26/163) seeking approval of the Community Empowerment Annual Report for
2025/26 which provides an overview of the work done to promote and respond to
interest in Community Asset Transfer and Participation Requests. 
Resolved:
(i) The Community Empowerment Annual Report 2025/26, be approved. 
Page 6 of 140

Page 7

HOUSING AND SOCIAL WELLBEING 
OUTSTANDING BUSINESS STATEMENT (OBS)
(26/262) 
Please note that this statement sets out outstanding decisions of Council / this committee / sub-committee along with an update and estimated
completion date.  Actions which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then
agreement will be sought to its removal from the OBS. 
No  Date / Minute
Reference /
Report Number
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
Due/completed
Action
Expected
53. 8 October 2025 Item 7 – Strategic
Housing
Investment Plan
Results of
keyworker need
survey to be
shared and
incorporated into
housing
objectives.
Survey to be shared once
follow up scrutiny of
results is complete. 
Consideration will be
given to including the
survey results into the
new and Housing Need
and Demand
Assessment (HNDA) that
is currently underway and
renewed every 5 years. 
Update March 26 –
Survey response rate
was low and advice has
been sought from HSCP
about whether it’s in line
with what was expected
or if an extension of the
survey would be
possible. 
N Sworowski /
Economy,
Development
and Planning
ONGOING Late 2026
4
Page 7 of 140

Page 8

No  Date / Minute
Reference /
Report Number
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
Due/completed
Action
Expected
The responses that have
been received will be fed
into the Housing Needs
and Demand
Assessment that is
currently underway that
supports the Local
Development Plan and
the Local Housing
Strategy. The results of
this assessment will be
fed into both documents
and results can be
shared once finalised. 
60. 3 June 2026 Item 6 – Perth and
Kinross Local
Policing End of
Year Report – 1
April 2025 – 31
March 2026
Further
information to be
provided in
relation to the
financial impact
of Operation
Leste in P&K
Circulated to Elected
Members via email
23/09/26. 
Police Scotland COMPLETE 30
September
2026
61. 3 June 2026 Item 6 – Perth and
Kinross Local
Policing End of
Year Report – 1
April 2025 – 31
March 2026
Further reporting
requested in
relation to online
form completion
for shoplifting,
specifically
figures and user
feedback. 
Circulated to Elected
Members via email
23/09/26.
Police Scotland COMPLETE 30
September
2026
62. 3 June 2026 Item 6 – Perth and
Kinross Local
Policing End of
Year Report – 1
Further
information to be
provided in
relation to
Circulated to Elected
Members via email
23/09/26.
Police Scotland COMPLETE 30
September
2026
Page 8 of 140

Page 9

No  Date / Minute
Reference /
Report Number
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
Due/completed
Action
Expected
April 2025 – 31
March 2026
antisocial
behaviour
statistics across
Scotland in
comparison to
P&K.
Thematic Presentation by
Police Scotland
scheduled for Committee
on 30/09/26.
63. 3 June 2026 Item 6 – Perth and
Kinross Local
Policing End of
Year Report – 1
April 2025 – 31
March 2026
Information to be
shared on how
to access Driver
Engagement
programmes. 
Circulated to Elected
Members via email
23/09/26.
Police Scotland COMPLETE 30
September
2026
64. 3 June 2026 Item 6 – Perth and
Kinross Local
Policing End of
Year Report – 1
April 2025 – 31
March 2026
Communications
regarding rape
and sexual
abuse crimes – 
• Justification of
figures in
relation to
inclusion of
historical
reporting.
• Prevention
agenda in
schools /
education
settings.
Circulated to Elected
Members via email
23/09/26.
Police Scotland COMPLETE 30
September
2026
65. 3 June 2026 Item 6 – Perth and
Kinross Local
Policing End of
Year Report – 1
Further statistics
to be provided in
relation to
recorded police
officer assaults. 
Circulated to Elected
Members via email
23/09/26.
Police Scotland COMPLETE 30
September
2026
Page 9 of 140

Page 10

No  Date / Minute
Reference /
Report Number
Subject Title Outstanding
Action
Update  Lead Officer
/Service
Action 
Due/completed
Action
Expected
April 2025 – 31
March 2026
Page 10 of 140

Page 11

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________  
Committee or Board: Housing & Social Wellbeing Committee 
Date of Meeting:  30 September 2026 
Report Title:   Annual Update on Perth and Kinross Local Housing    
Strategy 2022-2027 
Report Number:  26/263 
Report Author:  Hannah Maclean, Planning & Policy Officer – 
Planning & Housing Strategy 
Organisational Lead: Elaine Ritchie, Strategic Lead - Housing &      
Communities 
Serge Merone, Strategic Lead - Economy,   
Development & Planning
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to note progress in implementing the Local
Housing Strategy for Perth and Kinross previously approved at Housing and
Social Wellbeing Committee on 15 March 2023 and to approve the priorities
for the current year. 
1.2 Sections 
1. Purpose 
2. Recommendation(s)
3. Background and Context 
4. Perth and Kinross Local Housing Strategy 2022-2027 Annual Progress
Update Year 4
5 Rapid Rehousing Transition Plan
6. Implementation and Review
7. Monitoring
8. Conclusion
9. Impact Value Assessment
10. Appendices 
6
Page 11 of 140

Page 12

2. Recommendations 
It is recommended that the Housing and Social Wellbeing Committee: 
2.1 Notes the progress made during 2025-2026 towards achieving the outcomes
set out within the LHS Action Plan (Appendix 1). 
2.2 Approves the priorities for 2026-2027 set out in Section 6 below. 
3. Background and Context 
3.1 The Housing (Scotland) Act 2001 places a statutory requirement on local
authorities to prepare a Local Housing Strategy (LHS) supported by an
assessment of housing need and demand. The LHS provides the direction for
tackling housing issues and informs future investment in housing and related
services. 
3.2 The LHS outlines what the Council and its partners would like to deliver for all
areas within Perth and Kinross during the five-year period 2022-2027. The
LHS 2022-2027 was prepared in accordance with the Scottish Government’s
Local Housing Strategy Guidance 2019 which sets out statutory requirements,
essential links and outcomes that should be considered within the LHS
framework. 
3.3 LHS Guidance also states that local authorities are required to report and
review annually on progress against the target(s) as part of an annual report
on how the LHS is implementing its priorities and plans for the delivery of
housing and housing related services within the five-year period of the
strategy. 
3.4 The Local Housing Strategy 2022-2027 was approved at Housing and Social
Wellbeing Committee on 15 March 2023 (Report No.23/82). This report
presents progress of the fourth year of the strategy covering the period 2025
to 2026. 
3.5 Key partners and stakeholders underpin successful implementation and
delivery of LHS actions which has continued positively in the third year of the
strategy through ongoing engagement, quarterly newsletters, and an in-
person workshop. 
3.6 The LHS 2022-2027 is firmly aligned to the priorities and vision of the
Corporate Plan 2022/23 – 2027/28 (December 2022) for a Perth and Kinross
where everyone can live life well, free from poverty and inequality. The LHS
2022-2027 reflects the views of our communities, elected members,
stakeholders, and partner organisations. These views have helped influence
the development of the LHS priorities and outcomes which are most important
for Perth and Kinross, in enabling Perth and Kinross Council and partners to
deliver high-quality housing and housing services to meet the needs of local
people in all housing tenures. 
Page 12 of 140

Page 13

4. Perth and Kinross Local Housing Strategy 2022-2027 Annual Progress
Update 2025-2026 for Year 4 
4.1 The annual progress report for Year 4 (2025-26) is attached in Appendix 1.
The Local Housing Strategy has the following four priorities for action
including the key areas of progress: 
4.2 Priority 1: Providing more affordable homes to support liveable and
sustainable communities: 
4.2.1 The LHS’s aim is to evidence local housing need and set a strategic vision
over the next five years for housing across public and private sectors, by
providing the right size, type, and tenure of housing in sustainable, well-
connected places. 
4.3  During 2025-26, the following was achieved:   
• New affordable homes for social rent were delivered above target as well
as delivery of additional mid-market rental homes across the Perth and
Kinross area.
• The Council’s own housing stock was increased through the purchase of
buybacks and bringing empty homes back into use for affordable
housing. 
• A number of projects progressed to identify the potential for more
housing in rural areas through housing needs assessments, feasibility
studies and utilising the Self-Build Register. 
• Undertook statutory consultation for planning policy to be developed
through LDP3 for Short Term Let (STL) control areas with results
contributing to the vote to complete the statutory process. 
4.4 The impact of these activities has been to help meet housing need in the area
and provide affordable housing across all tenures. The additional affordable
housing has enabled turnover within the overall stock and supported
increased access to settled accommodation, reduced pressure on temporary
accommodation and contributed to preventing homelessness. By expanding
our stock through buybacks and empty homes, we have ensured we have
more homes of the right type and size in areas people want to live in. This has
enabled throughput and met a range of housing needs in the area including
overcrowding, under occupying, alleviating homelessness, and meeting
mobility needs. Despite significant challenges arising from the national
housing emergency, continued housing supply pressures, increasing demand
and the growing complexity of homelessness cases, Perth and Kinross
experienced only a modest increase in homelessness presentations during
2025/26 compared with the previous year, demonstrating the effectiveness of
early intervention, prevention and housing support measures. The new
affordable housing supply and buy-backs mentioned above has been vital in
terms of preventing homelessness, meeting homelessness demand, and
minimising the requirement for and duration spent in temporary
accommodation. 
Page 13 of 140

Page 14

4.6 Priority 2: Providing a range of housing options that people can easily
access, afford and keep 
4.6.1  The LHS’s aim is to set out the role that housing can play in improving
housing choice across all tenures and the LHS contribution to tackling child
poverty and further development of the Council’s Rapid Rehousing Transition
Plan (RRTP), building on the Home First model. 
4.7 During 2025-26, the following was achieved:   
• Continued to develop our Home First model focusing on building
resilience in the face of increased demand.
• Support provided to PRS households to prevent homelessness and
hardship.
• The Floating Housing Support Service was retendered to include
flexibility in the level of support available to those with varying and high
support needs.
• Support provided to households to sustain their tenancy increased
through initiatives such as our Tenancy Sustainment Fund, Financial
Inclusion Project and Think Yes budget. 
• Housing and Social Wellbeing Committee considered the introduction of
MMR development by PKC which is now progressing. 
4.8 The impact of these activities has been to support people to have increased
awareness and access to suitable housing options to mitigate the impact of
housing induced poverty and poor housing affordability. We have undertaken
work to reduce the stigma associated with homelessness and minimised the
impact and duration of households experiencing homelessness in Perth and
Kinross. 
4.9 Priority 3: Delivering housing for people with varying needs 
4.9.1 The LHS’s aim is to deliver accessible homes, wheelchair homes and
particular forms of provision such as supported accommodation for key client
groups to enable people to live independently and well, for as long as
possible, through investment in property adaptations, technology, care and
support services. 
4.10 During 2025-26, the following was achieved:   
• Continued investment in adaptations to Council and Housing Association
properties and support for private tenants and homeowners through the
Care and Repair Scheme. 
• Established a new Complex Housing Solutions Panel to support those
with adapted housing needs to be supported into suitable housing.
• The Health and Social Care Partnership (HSCP) TEC Programme
continued to support people to live safely and independently at home.
• Additional new build accommodation linked to 24/7 onsite staff support
through technology was delivered by RSL Partner Hillcrest. 
Page 14 of 140

Page 15

• New energy efficient chalets for the Gypsy Traveller site were delivered
alongside the start of upgrades being installed to create a sustainable
environment for residents and support climate change ambitions. 
4.11 The impact of these activities has been to enable people to live independently
and well for as long as possible through investment in property adaptations,
technology, care and support services. Through increased partnership
working, and an increase in preventative housing and support services, more
people have been enabled to remain in their own home, leave hospital or out
of area placements and to live in their chosen community independently with
support, close to family and support networks. 
4.12 Priority 4: Delivering quality homes with affordable warmth, zero
emission and SMART technology 
4.12.1 The LHS’s aim is to provide the strategic framework for improving the quality
and energy efficiency of homes across all tenures, driving improvement in
housing induced poverty and proactively tackling fuel poverty through
investment in housing condition and energy improvements; and setting a road
map for reducing domestic carbon emissions. 
4.13 During 2025-26, the following was achieved:   
• PKC approved procurement of a Strategic Energy Partner (SEP) which
will support delivery of projects identified through LHEES and Local Area
Energy Plan (LAEP), helping to achieve key strategic objectives relating
to carbon reduction, fuel poverty and energy resilience.
• Energy efficiency advice continued to be offered to households through
working with Save Cash and Reduce Fuel (SCARF), resulting in savings
for residents, reductions in carbon emissions and removing some
residents from fuel poverty. 
• Further investment in existing stock and new build housing with
installation of energy efficiency improvements. 
• The Missing Shares Service saw further investment in communal repairs
for homeowners. 
• In partnership with Registered Social Landlords, additional new build
properties benefited from fibre installation allowing residents much
improved access. 
4.14 The impact of these measures ensures that people can live in and benefit
from homes which meet energy efficiency, climate change and housing quality
ambitions. Investment in housing condition and energy improvements,
including mechanisms and support to enable landlords and owners to invest
in repairs and maintenance has improved the quality of housing for residents. 
5. Rapid Rehousing Transition Plan 
5.1  A transition to rapid rehousing is no longer a realistic ambition for most local
authorities even with the Scottish Government’s reaffirmation of its
commitment to ‘Ending Homelessness Together.’ 
Page 15 of 140

Page 16

The Scottish Government confirmed that they will no longer require local
authorities to update and submit revised RRTPs. It is anticipated that the
Scottish Government focus will shift towards the new Prevention Duty within
the Housing (Scotland) Act 2025 which places responsibility on “relevant
bodies” to ask and act in relation to homelessness. The key changes are that
it places responsibility around homelessness on more than just local authority
homeless / housing services, and the definition of someone who is threatened
with homelessness will be extended from 2 months to 6 months, with the aim
of increasing the time available to intervene. The legislation requires “Ask and
Act” to be implemented no more than 3 years after Royal Assent which will be
November 2028. 
5.2  It has been agreed that a Homelessness Strategy or Statement will be
developed as an appendix to the next LHS which is due to be published in
May 2028. 
6. Implementation and Review 
6.1 The Scottish Government declared a national housing emergency in May
2024. A number of factors continue to present challenges to the delivery of
LHS priorities. These issues will be considered during the development of the
next LHS and, where appropriate, will inform priorities and actions for
2026/27. 
6.2 Considerations for Future LHS 2028-2032: 
6.2.1 Delivering on priorities within a national housing emergency landscape:
The strategy has had to adjust, and it will be a consideration of the new LHS
to review the increasing demand and complex need within an increasingly
constrained development context. The housing landscape has become
extremely challenging with an intricate mix of supply and demand pressures
and socio-economic factors driving an increase in the proportion of people
whose only realistic housing option is social housing. This places a focus on
ensuring that there is a resilient housing system in Perth and Kinross. 
6.2.2 Housing affordability pressures:
Affordable housing need will continue to increase in Perth and Kinross
through rising levels of homelessness, the cumulative shortfall of past AHSP
delivery relative to estimated need; inflation in housing and rental prices,
particularly in the PRS. Alongside this, the new LHS will also have to consider
the continued growth in the number of households, while there is a continued
decline in the average household size as our population continues to grow
older. 
6.2.3 Housing supply challenges, rising development costs and funding
uncertainty:
New housing supply in both the private and social sector has fallen, with one
of the most significant factors affecting the delivery of new homes is the
continued increase in construction costs, which is impacting the viability of
housing projects across all tenures. This is also contributing to greater
Page 16 of 140

Page 17

uncertainty around viability of a scheme. In addition, there is uncertainty of the
level of financial support that will be available from the Scottish Government
beyond the published RPA’s announced via Affordable Housing Supply
Programme. 
6.2.4 Slowing housing delivery across the construction sector:
The residential construction sector has experienced a general slowdown,
affecting the overall rate of housebuilding. This has reduced the number of
affordable homes being delivered through larger mixed-tenure developments. 
6.2.5 Challenges in rural areas:
These factors have a more pronounced impact in rural communities, where
development viability is often more challenging and access to grant funding
can be limited. Rural projects may also face difficulties in attracting contractor
interest due to geographic location and smaller development scales. 
6.2.6 Balancing quality standards and affordability:
Housing projects are developed with the costs associated with meeting
Building Standards and the Council's Design Guide requirements fully
reflected within viability assessments. While these standards support higher
quality homes, improved accessibility, and greater energy efficiency, they can
add to development costs in an already challenging market. As further
projects are delivered, there may be opportunities to review how design
standards can continue to achieve high-quality, accessible and sustainable
homes while supporting development viability and affordability. 
6.2.7 Temporary accommodation pressures:
The proportion of people presenting as homeless who require temporary
accommodation has increased during the life of the current LHS. This has
created extreme challenges in managing temporary accommodation and,
whilst Perth and Kinross have not breached its statutory duties, temporary
accommodation has reached capacity within most of this period. The next
LHS will need to ensure prevention work continues to adapt to these
challenges through additional resources, alongside an increase in affordable
housing supply and to ensure continuous availability of temporary
accommodation. 
6.2.8 Increasing housing tenure choice:
There is a need to ensure that a wider range of housing tenures is available
across Perth & Kinross Council-led developments, Registered Social Landlord
projects, and larger private sector housing sites. A broader tenure mix can
increase housing choice, support the creation of balanced and sustainable
communities, and help meet a wider range of housing needs. It may also
assist in reducing pressure on the Common Housing Register and provide
more flexible housing options for households experiencing, or at risk of,
poverty. 
6.2.9 Supporting energy efficiency and net zero objectives:
Consideration should be given to strengthening support, advice, and
awareness around domestic energy use and energy efficiency. 
Page 17 of 140

Page 18

There may also be opportunities to align future housing initiatives with projects
emerging through the Local Heat and Energy Efficiency Strategy (LHEES)
and Local Area Energy Planning (LAEP) processes. 
6.2.10 Improving resilience to flooding and climate change:
There is an opportunity to further promote the role of homeowners in
managing and reducing local flood risk. This could include encouraging
routine property maintenance, such as gutter clearance, and the use of
permeable materials in gardens and driveways. 
6.3 The following section demonstrates our key priorities as we enter the final
year of the LHS. We are progressing these actions in order to build on
progress made since 2022 to continue to help meet housing need, to support
people to have increased awareness and access to suitable housing options,
and to enable people to live independently and benefit from homes which
meet energy efficiency ambitions:   
6.4 Priorities for 2026-27: 
6.4.1 Priority 1:
• Accelerate delivery of our affordable housing programme of 1,050
homes over the five-year LHS period, through our Strategic Housing
Investment Plan and actions to build the affordable housing land supply. 
• Continue to progress our buyback enhanced target of 50 for the coming
year, alongside continued action to bring empty homes back into use.
• Deliver 50% affordable homes through brownfield regeneration and
change of use for vacant properties.
• Continue to support delivery of local Housing Need Assessments and
Community-led projects in rural areas.
• Seek opportunities to deliver a wider range of affordable housing options
e.g. intermediate housing, LCHO and affordable self-build. 
6.4.2 Priority 2:
• Continue to develop and improve tailored debt advice and welfare
assistance to households across Perth and Kinross.
• Explore potential projects to deliver key worker housing in Northern
Perthshire.
• Continue to work with partners to offer housing and support options to
refugees in response to national dispersal and resettlement programmes
and statutory responsibilities.
• Increase engagement with private landlords in Perth and Kinross to
improve awareness of proposed PRS reforms and investment regarding
energy efficiency measures. 
6.4.3 Priority 3:
• Develop dementia-friendly design for social rented new build
developments through our Design Guide.
Page 18 of 140

Page 19

• Ensure planning policy, placemaking and housing investment contribute
to health and wellbeing, particularly through development in rural areas
in partnership with RSLs and HSCP.
• Contribute to enabling greater tenure choice and avoid crisis
interventions at a later stage by testing development of flexible tenure
models for older households.
• Progress core and cluster projects through Independent Living Panel.
• Take account of workforce capacity, transport and accessibility issues
and site locations in preparation of LDP3. 
6.4.4 Priority 4:
• Support implementation of LHEES Delivery Plan to improve energy
efficiency across all tenures.
• Build an understanding of the current and future skills and training
requirements of the construction sector to deliver quality homes.
• Continue to build new affordable housing to enhanced energy efficiency
standards and encourage private developers to do so too.
• Take action to ensure that landlords and households are resilient to
possible effects of climate change and flooding.
• Develop and deliver exemplar pilot projects that incorporate net zero
planning across a range of sectors. 
6.5 It is recommended that Committee approve these priorities identified within
the LHS Action Plan 2022-2027 (Appendix 1) for the year 2026-2027. 
6.6 The Scottish Government’s More Homes Division have confirmed that the
Resource Planning Assumption (RPA) for 26/27 will be £16,998,000. They
have also confirmed amounts for 27/28 of £17,508,000; for 28/29 of
£18,033,000; and for 29/30 of £18,574,000. 
7 Monitoring 
7.1 Actions are being implemented through the LHS Delivery Group and by
operational teams. The LHS Delivery Group continues to build on the strong
partnerships already in place, recognising that achieving LHS priorities will
require a collective effort from delivery partners, stakeholders, communities,
and residents of Perth and Kinross. 
7.2 The LHS Communications Plan sets out regular consultation and engagement
with stakeholders. It also ensures there is awareness of the key housing
priorities for Perth and Kinross until 2027. 
8. Conclusion 
8.1 The report outlines the significant outcomes achieved by key action leads,
coordinators and partners of delivering actions within the Local Housing
Strategy 2022-2027, alongside key priority actions for 2026-2027. 
8.2 The Tenant Committee Report Panel was consulted on this report on 17
September and provided the following comment: 
Page 19 of 140

Page 20

“This is the fourth year of the current Local Housing Strategy and we think it is
continuing to build on the successes of previous years.” The Panel also
reported that they value involvement in the LHS and having ongoing
engagement. 
9. Impact and Value Assessment 
9.1 Annual_Update_on_Perth_and_Kinross_Local_Housing_Strategy_2022-
2027.pdf 
10. Appendices 
10.1 Appendix 1 – Local Housing Strategy (LHS) 2022-2027 Annual Progress
Report 
Page 20 of 140

Page 21

PKC - GENERAL
Appendix 1 
Perth and Kinross 
Local Housing Strategy
2022-2027
Annual Progress Report for 
2025-2026
6
Page 21 of 140

Page 22

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 2
PKC - GENERAL 
Perth and Kinross Local Housing Strategy 2022-2027 Annual Progress Report for
Year 4
The Local Housing Strategy (LHS) 2022-2027 sets out Perth and Kinross’ five-year plan for
the direction and delivery of housing for the area. Scottish Government Guidance states
that local authorities must review LHS actions annually in order to evidence progress on
how the LHS is implementing its priorities and plans within the five-year period. This is the
fourth annual progress update to Housing and Social Wellbeing Committee in implementing
the strategy and covers Year 4 (2025/26). The aim of the LHS 2022-2027 is: 
To achieve this vision and realise the wider ambitions set out in the Local Outcomes
Improvement Plan 2022-2032, the four LHS priorities are: 
Within each LHS Priority there are a series of detailed Outcome Action Plans which set
specific actions with timescales, resources, and partner responsibilities. The LHS Delivery
Group continues to co-ordinate, monitor and guide implementation and delivery, and
evaluate the impact of housing led activity, partnership, and investment.
The LHS Action Plan, activities and targets will be reviewed annually to ensure services
and partners are able to respond flexibly to changes in need across Perth and Kinross. 
Page 22 of 140

Page 23

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 3
PKC - GENERAL
Achievements  
Priority 1: Providing more affordable homes to support liveable and sustainable
communities 
In 2025 / 2026: 
▪ Delivered a total of 239 affordable homes including 228 for social
rented housing, and 11 for mid-market rent. 
▪ Delivered 24 Council new build homes and supported the completion
of 86 new build affordable homes in partnership with RSLs across four
developments.
▪ Delivered new supply across the Perth and Kinross area, both in
urban 62% and rural 38% areas and 9 affordable homes on one
brownfield site.
▪ Purchased 116 buybacks to increase the Council’s housing stock and
exceeded target of 40 properties due to increased budget capacity
and a sharp focus on reducing housing pressures.
▪ Brought back 11 empty homes for people in need of accommodation
through the Empty Homes Initiative (EHI).
▪ Supported the completion of 7 Housing Needs Assessments in rural
areas.
▪ Continued to promote our first Self-Build Register with 47 expressions
of interested registered to date.
▪ Undertook statutory consultation for planning policy to be developed
through LDP3 for Short Term Let (STL) control areas, with results
contributing to Elected members voting to complete the statutory
process (and submit to Scottish ministers for approval). 
Page 23 of 140

Page 24

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 4
PKC - GENERAL
Achievements 
In 2025 / 2026:
▪ Continued to develop our Home First model with a focus on building
resilience in the face of increased demand, minimising the need for
temporary accommodation and supporting people to have successful
tenancies through our Property Ready Fund and the provision of
housing support.
▪ Supported 171 positive asylum decisions including 157 being offered
housing advice, 25 offered social housing, and 48 former asylum
seekers and refugees accessing PRS housing. 
▪ Supported 62 households in the PRS to sustain their tenancies and
prevent homelessness and hardship.
▪ Supported 1319 households to sustain their tenancy through our
Tenancy Sustainment Fund, Financial Inclusion Project and Think
Yes budget.
▪ Retendered the Floating Housing Support Service to include the
option for different levels of support, including those with high support
needs.
▪ Continued to deliver positive outcomes for people experiencing
homelessness despite increase demand.  The length of time spent in
temporary accommodation and the overall duration of homelessness
has been maintained at a level close to our previous sector leading
performance. 
Priority 2: Providing a range of housing options that people can easily access,
afford and keep
Page 24 of 140

Page 25

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 5
PKC - GENERAL
Achievements 
Priority 3: Delivering housing for people with varying needs
In 2025 / 2026: 
▪ Invested £561,108.30 following OT assessment in 88 major and 346
minor adaptations for local authority tenants. 
▪ Supported 167 major adaptations for private tenants and
homeowners through our Care and Repair Scheme.
▪ Matched 6 referrals to various supported and bespoke
accommodation through our Independent Living Panel (ILP) for
individuals with long-term support needs.
▪ Delivered one new build project for independent living needs in
Crieff with RSL partner Hillcrest Homes.
▪ Established a new Complex Housing Solutions Panel to support
those whose needs cannot be met through standard housing routes.
▪ The TEC Programme through the Health and Social Care
Partnership (HSCP) continued to support people to live safely and
independently at home through Community Alarm and Telecare and
launched a new Health and Social Care website
▪ RSL Partners delivered 9 wheelchair accessible properties and 10
adapted properties through our new build programme.
▪ Completed significant improvement works at Double Dykes Gypsy /
Traveller site with 20 new energy efficient chalets, complete with air
source heat pumps and solar PV. 
Page 25 of 140

Page 26

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 6
PKC - GENERAL
Achievements 
Priority 4: Delivering quality homes with affordable warmth, zero emissions and
SMART technology
In 2025 / 2026: 
▪ PKC approved procurement of a Strategic Energy Partner (SEP)
which will support delivery of projects identified through LHEES and
Local Area Energy Plan (LAEP), helping to achieve key strategic
objectives relating to carbon reduction, fuel poverty and energy
resilience.
▪ Increased our work with SCARF to deliver our Home Energy Advice
Team (HEAT) service, providing free and impartial energy efficiency
advice to over 900 households which resulted in savings for residents,
reductions in carbon emissions and removed some residents from fuel
poverty.
▪ Improved the energy efficiency of 49 properties within our existing
Council housing stock through replacement of electric storage heaters
with high heating retention.
▪ Delivered 16 new build properties which all will benefit from air source
heat pumps and 4 will also benefit from installation of solar PV panels. 
▪ RSL partners have improved the condition of existing stock through
installation of 114 PV panels and replacement of 31 electric storage
heaters with high heating retention.
▪ RSL partners have delivered 32 properties with electric storage
heating and 7 with air source heat pumps.
▪ £931,308 invested in communal repairs for homeowners through our
Missing Shares service.
▪ Delivered fibre to 86 new build properties in partnership with RSLs. 
Page 26 of 140

Page 27

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 7
PKC - GENERAL
Considerations for Future LHS (2028-2032)
The Scottish Government declared a national housing emergency in May 2024. A number of factors
continue to present challenges to the delivery of LHS priorities. These issues will be considered
during the development of the next LHS and, where appropriate, will inform priorities and actions for
2026/27. 
Delivering on priorities within a national housing emergency landscape
The strategy has had to adjust, and it will be a consideration of the new LHS to review the
increasing demand and complex need within an increasingly constrained development context. The
housing landscape has become extremely challenging with an intricate mix of supply and demand
pressures and socio-economic factors driving an increase in the proportion of people whose only
realistic housing option is social housing. This places a focus on ensuring that there is a resilient
housing system in Perth and Kinross.
Housing affordability pressures 
Affordable housing need will continue to increase in Perth and Kinross through rising levels of
homelessness, the cumulative shortfall of past AHSP delivery relative to estimated need; inflation in
housing and rental prices, particularly in the PRS. Alongside this, the new LHS will also have to
consider the continued growth in the number of households, while there is a continued decline in the
average household size as our population continues to grow older.
Housing supply challenges, rising development costs and funding uncertainty
New housing supply in both the private and social sector has fallen, with one of the most significant
factors affecting the delivery of new homes is the continued increase in construction costs, which is
impacting the viability of housing projects across all tenures. This is also contributing to greater
uncertainty around viability of a scheme and is expected to continue. In addition, there is uncertainty
of the level of financial support that will be available from the Scottish Government beyond the
published RPA’s announced via Affordable Housing Supply Programme.
Slowing housing delivery across the construction sector
The residential construction sector has experienced a general slowdown, affecting the overall rate
of housebuilding. This has reduced the number of affordable homes being delivered through larger
mixed-tenure developments.
Challenges in rural areas
These factors have a more pronounced impact in rural communities, where development viability is
often more challenging and access to grant funding can be limited. Rural projects may also face
difficulties in attracting contractor interest due to geographic location and smaller development
scales.
Balancing quality standards and affordability
Housing projects are developed with the costs associated with meeting Building Standards and the
Council's Design Guide requirements fully reflected within viability assessments. While these
standards support higher quality homes, improved accessibility, and greater energy efficiency, they
can add to development costs in an already challenging market. As further projects are delivered,
there may be opportunities to review how design standards can continue to achieve high-quality,
accessible and sustainable homes while supporting development viability and affordability. 
Page 27 of 140

Page 28

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 8
PKC - GENERAL
Temporary accommodation pressures
The proportion of people presenting as homeless who require temporary accommodation has
increased during the life of the current LHS. This has created extreme challenges in managing
temporary accommodation and, whilst Perth and Kinross have not breached its statutory duties,
temporary accommodation has reached capacity within most of this period. The next LHS will need
to ensure prevention work continues to adapt to these challenges through additional resources,
alongside an increase in affordable housing supply and to ensure continuous availability of
temporary accommodation.
Increasing housing tenure choice
There is a need to ensure that a wider range of housing tenures is available across Perth & Kinross
Council-led developments, Registered Social Landlord projects, and larger private sector housing
sites. A broader tenure mix can increase housing choice, support the creation of balanced and
sustainable communities, and help meet a wider range of housing needs. It may also assist in
reducing pressure on the Common Housing Register and provide more flexible housing options for
households experiencing, or at risk of, poverty.
Supporting energy efficiency and net zero objectives
Consideration should be given to strengthening support, advice, and awareness around domestic
energy use and energy efficiency. There may also be opportunities to align future housing initiatives
with projects emerging through the Local Heat and Energy Efficiency Strategy (LHEES) and Local
Area Energy Planning (LAEP) processes.
Improving resilience to flooding and climate change
There is an opportunity to further promote the role of homeowners in managing and reducing local
flood risk. This could include encouraging routine property maintenance, such as gutter clearance,
and the use of permeable materials in gardens and driveways. 
Page 28 of 140

Page 29

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 9
PKC - GENERAL 
Priorities for 2026-2027   
This section demonstrates our key priorities as we enter the final year of the LHS. We
are progressing these actions in order to build on progress made since 2022 to
continue to help meet housing need, to support people to have increased awareness
and access to suitable housing options, and to enable people to live independently
and benefit from homes which meet energy efficiency ambitions: 
Priority 1
• Accelerate delivery of our affordable housing programme of 1,050
homes over the five year LHS period, through our Strategic
Housing Investment Plan and actions to build the affordable
housing land supply.
• Continue to progress our buyback enhanced target of 50 for the
coming year 
• Deliver 50% affordable homes through brownfield regeneration
and change of use for vacant properties
• Continue to support delivery of local Housing Need Assessments
and Community-led projects in rural areas.
• Seek opportunities to deliver a wider range of affordable housing
options e.g. intermediate housing, LCHO and affordable self-build. 
Priority 2
• Continue to develop and improve tailored debt advice and welfare
assistance to households across Perth and Kinross.
• Explore potential projects to deliver key worker housing in
Northern Perthshire.
• Continue to work with partners to offer housing and support
options to refugees in line with national dispersal and resettlement
programmes and arrangements.
• Increase engagement with private landlords in Perth and Kinross
to improve awareness of proposed PRS reforms and investment
regarding energy efficiency measures. 
Page 29 of 140

Page 30

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                 10
PKC - GENERAL
Priorities for 2026-2027   
Priority 3
• Develop dementia-friendly design for social rented new build
developments through our Design Guide.
• Ensure planning policy, placemaking and housing investment
contribute to health and wellbeing, particularly through
development in rural areas in partnership with RSLs and HSCP.
• Contribute to enabling greater tenure choice and avoid crisis
interventions at a later stage by testing development of flexible
tenure models for older households.
• Progress core and cluster projects through Independent Living
Panel.
• Take account of workforce capacity, transport and accessibility
issues and site locations in preparation of LDP3. 
Priority 4
• Support implementation of LHEES Delivery Plan to improve
energy efficiency across all tenures.
• Build an understanding of the current and future skills and training
requirements of the construction sector to deliver quality homes.
• Continue to build new affordable housing to enhanced energy
efficiency standards and encourage private developers to do so
too.
• Take action to ensure that landlords and households are resilient
to possible effects of climate change and flooding.
• Develop and deliver exemplar pilot projects that incorporate net
zero planning across a range of sectors. 
Page 30 of 140

Page 31

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 11
PKC - GENERAL
LHS Outcome 1: Providing more affordable homes to support liveable and sustainable communities 
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Tayside HNDA 2022, Perth
and Kinross Housing Supply Targets 2022+, Planning Advice Note (PAN) 2/2010: Affordable Housing and Land Audits, Perth and Kinross Local
Development Plan, Scottish Planning Policy (SPP), ‘A Place to Stay, A Place to Call Home: a Strategy for the Private Rented Sector in Scotland’, Public
Health Priority, Scotland’s National Performance Network, Creating Places – A Policy Statement on Architecture and Place for Scotland, Designing Streets,
Green Infrastructure: Design and Placemaking, Planning Advice Note 77: Designing Safer Places, Community Empowerment Act 2015, Place Standard,
Town Centre First Principle, National Planning Framework 4, National Transport Strategy 2.
Action
No.
Action(s) and
Commitments
for Outcome
Delivery
Baseline Indicator or
Measure Milestone Target /
End Point
Action Lead /
Coordinator
Progress 2025-2026
1.1 Deliver PKC’s
affordable
housing
programme of
1,050 homes
over the next
five years
800
affordable
homes
(Target in
LHS 2016-
2021) 
Urban
(53%) /
Rural (47%)
split 
Affordable
housing
completions   
Monitor the
Urban / Rural
split to ensure
representative
distribution 
• Achieve an average
of 210 affordable
housing
completions each
year
• 70% Social Rent
(735/1050)
• 30% other
affordable tenure
(315/1050 - LCHO,
MMR, Self-Build)
• Maintain 53% / 47%
split across urban
and rural areas
2027  Housing
Strategy 
(Ronnie
MacRae) 
Registered
Social
Landlords
(RSL)
There were 239 affordable housing
completions: 
New Supply 2025 / 2026
PKC New Build 24
RSL New Build 86
Buybacks* 116
HRA Purchase** 2
Empty Homes as
reported in 1.2 11
Total 239
Tenure 
Social Rent 228 (95%)
MMR 11 (5%)
Empty Homes for
MMR 0
LCHO 0
Total 239
Locality Split
Urban 62%
Rural 38% 
Page 31 of 140

Page 32

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 12
PKC - GENERAL 
*Please note that a proportion of
Buybacks will have sitting tenants
and therefore would not be counted
as new tenancies. Further work will
be progressed to explore the impact
of buybacks in the future. 
**2 properties previously owned by
the National Trust for Scotland in
Dunkeld were purchased by PKC
using funding from the Housing
Revenue Account (HRA). 
The Scottish Government Affordable
Housing Supply Programme (AHSP)
comprises a range of funding
mechanisms to enable affordable
housing providers to deliver homes
for social rent, mid-market rent, and
low-cost home ownership to support
the LHS. AHSP funding allocated to
RSLs per year is higher than funding
allocated to PKC, which results in
more RSL new build completions
than PKC. 
Further localised targets for both
urban and rural areas will be
reflected in the SHIP report in
September 2026. 
1.2 Develop an
Empty Homes
Action Plan
Current
Empty
Number of
empty homes
• Develop evidence
base to
Ongoing  Tourism,
Culture and
Place   
89 properties (included in this is 11
Empty Homes) brought back into use
Page 32 of 140

Page 33

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 13
PKC - GENERAL
which targets
investment in
areas where
housing
pressure is
evidenced
Homes
evidence
Current
pressure
analysis
and local
housing
systems
analysis
brought back
into use 
demonstrate areas
of housing pressure
• Consultation with
stakeholders and
partners on action
plan development
• Develop and
implement action
plan 
Under
Review 
Under
Review 
Housing
(Martin Smith)
through a variety of grants and
initiatives. 
The Empty Homes Initiative Grants
are distributed to enable long-term
empty properties to be brought up to
the Repairing Standard and used
again as affordable housing as
outlined in the Housing (Scotland)
Act 2006. Grants of up to £7,500 per
bedroom are available and are
awarded on a discretionary basis,
subject to availability. This funding is
separate from the Scottish
Government Affordable Housing
Supply Programme funding as
reported in 1.1. The Empty Homes
Initiative is effective and is
considered an exemplar model within
Scotland. It is not currently clear
what value an Action Plan or
Strategy would have but this is being
kept under review.
1.3 Maximise the
potential to
generate more
homes through
brownfield
regeneration
which
encourages
mixed
developments
and change of
Vacant and
Derelict
Land
Register
Housing
Land Audit
Number of
completions on
brownfield
regeneration
sites 
Number of
homes created
as a result of
use for vacant
properties
• Develop a register
of potential
brownfield
regeneration sites
• Develop a register
of potential sites
that would be
suitable as housing
subject to change of
use
2023 
2023 
Ongoing 
Planning,
Transport and
Housing
Strategy
(Brenda
Murray) 
Tourism,
Culture and
Place 
There were 9 affordable completions
on 1 brownfield site. See Action 3.3
for further detail. 
The Urban Capacity and Brownfield
Study continue to progress and
inform the Vacant and Derelict Land
Register and PKC acquisitions. 
Page 33 of 140

Page 34

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 14
PKC - GENERAL
use for vacant
properties
• Evaluate sites in
line with SHIP
criteria
• Carry out feasibility
studies as required
• Deliver 50%
affordable homes
through brownfield
regeneration and
change of use for
vacant properties 
Ongoing 
2027
Housing
Strategy
(Ronnie
MacRae)   
1.4 Seek
opportunities to
deliver a wider
range of
affordable
housing options
e.g.,
intermediate
housing, LCHO
and affordable
self-build etc.
Average
number of
completions
for each
tenure per
annum
Number of
homes
delivered by
each tenure 
• Carry out feasibility
studies
• Identify and develop
partnerships to
deliver wider range
of affordable
housing options
• Establish a Self-
Build Register and
identify self-build
opportunities using
the Development
Management
process.
• Increase range of
affordable housing
options in rural
areas working in
partnership with
private estates,
landowners,
developers,
funders, and local
communities
Ongoing 
Ongoing 
Completed
2023 
Ongoing 
Housing
Strategy
(Ronnie
MacRae) 
Registered
Social
Landlords 
• Seven HNAs completed in
Kinloch Rannoch, Strathardle,
Dunkeld, Aberfeldy, Pitlochry,
Comrie and Blair Atholl
• Self-Build Register with 47
expressions of interest registered
to date.
• Ongoing discussions with eight
landowners / estates to date to
increase affordable housing in
rural areas.
• Further affordable housing-led
regeneration feasibility planned
for Perth City in 2026-27.
• Development work progressing
with seven further community-led
affordable housing projects
applications.
• Pitlochry Property Asset Review -
Rationalisation of property assets
for co-location resulting in 3
viable affordable housing sites for
Page 34 of 140

Page 35

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 15
PKC - GENERAL
• Undertake a
targeted Housing
Needs
Assessments
Programme (HNAP)
in rural settlements
where tackling a
lack of AH has been
identified as a
priority in
Community Action
Plans (CAPs) 
• Work in partnership
with rural housing
specialists to enable
Community
Development Trusts
to secure subsidy
from Scottish Land
Fund (SLF) and
Rural Housing Fund
(RHF), private and
other funding
sources to develop
community-led
housing projects 
• Aim to deliver, via a
community-led
approach, up to 100
new affordable
homes of various
types and tenures
that reflect HNAP
outputs, to be
delivered to Design
Ongoing 
Ongoing 
2027
redevelopment released within 2-
3 years.
• Revised Disposal of Land and
Buildings Policy to underpin
corporate priorities for affordable
housing. 
Page 35 of 140

Page 36

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 16
PKC - GENERAL
Guide Standard
over the period of
the strategy
1.5 Continue to
develop
partnership
working to
ensure
collaborative
investment
approach
towards locality
leadership and
place planning
processes
through
Community
Action Plans
and Local Place
Plans
Existing
community
planning
structures 
Current
partnership
projects
Collaborative
approaches to
investment
developed 
Joint projects
identified and
progressed
• Develop and
implement capacity
building
opportunities to
support master
planning, delegated
decision making
and budget
management
• Develop clear
definitions for
lifetime 20-minute
neighbourhoods
that enable
partners,
stakeholders, and
investors to pursue
placemaking which
improves
connectivity through
investment in
physical, social, and
digital infrastructure
• Evaluation of
existing structures
to identify
opportunities that
will empower local
teams to make a
difference within
their communities
Ongoing 
2026 
2027 
Tourism,
Culture and
Place 
Place
Strategies
(Nicola
Sworowski)
A Call for Sites ran from April to July
2025 that gave communities,
developers, landowners, and other
interested parties the opportunity to
help shape the new LDP3 by
promoting land for potential
development. The sites submitted
can be viewed on the map: LDP3
Call for Sites Submissions (2025).
Work has taken place to assess all
the 260- sites received alongside the
existing LDP2 allocations not yet
built out, urban capacity sites and
Perth Development Framework sites. 
Page 36 of 140

Page 37

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 17
PKC - GENERAL
1.6 Embed the
values of the
Perth and
Kinross Offer to
ensure
investment and
commitment
across Services
to develop and
deliver the LHS
Action Plan
Existing
structures
and groups
Demonstrate
delivery of
Perth and
Kinross Offer
• Develop and
improve existing
structures to pursue
innovation in
placemaking,
master planning,
construction
innovation and
housing design
• Develop
collaborative
partnerships which
test innovation in
housing design and
modern methods of
construction 
2023 
Ongoing
Housing
Strategy
(Ronnie
MacRae)
Quarterly newsletters providing
updates on LHS progress have been
circulated online to stakeholders and
elected members between April 2025
and March 2026.
1.7 Planning policy
to be developed
through LDP3
where
appropriate for
Short Term Let
(STL) control
areas
Number of
Short Term
Lets by
postcode
district and
HMA
Outcome of
analysis of
impact of STLs
on Housing
Pressures,
House Price,
PRS, ASB,
Community,
Amenities and
Facilities,
Tourism,
Economy
• Complete feasibility
study in relation to
STL Control Area
• Community
Consultation
• Local Development
Plan Policy to be
developed and
implemented where
appropriate for STL
Control Areas
Completed
2023 
Completed
2025 
2026
Place
Strategies
(Nicola
Sworowski)
Formal Statutory Consultation on the
proposed STL Control Area took
place between 28th October and 22nd
December 2025. 214 respondents
(76%) were in support of the
proposal, 21% were not and 3%
were undecided. 
The results of the statutory
consultation on the proposed STL
Control Area in Northern Perthshire
were reported to Full Council on 17th
June 2026. Elected members voted
to complete the statutory process
and submit the proposal to Scottish
Ministers for approval.
1.8 Pursue a pro-
active master
planning
LDP2 and
Housing
Land Audit 
Master Plans in
place
• Use placemaking
principles to engage
urban and rural
Ongoing  Place
Strategies
The LDP3 has progressed with the
Evidence Report passing through
Gate Check. Work on the Proposed
Page 37 of 140

Page 38

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 18
PKC - GENERAL
approach to
assist
development of
planning and
development
frameworks and
use powers
where
necessary to
acquire land and
property
landowners,
developers, and  
providers
• Identify
opportunities and
adopt Master
Planning approach
to effective land
supply where
appropriate 
Ongoing
(Nicola
Sworowski) 
Estates 
Plan is on-going and will incorporate
masterplans for development sites. 
The New Build Delivery Group
consisting of Housing, Housing
Strategy and Property colleagues
continues to identify and consider 
potential sites for affordable housing-
led redevelopment, including use of
public-sector assets, and engaging
with urban and rural landowners and
developers. 
LHS Outcome 2: Providing a range of housing options that people can easily access, afford, and keep
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Ending Homelessness
Together Action Plan, Equally Safe -Scotland’s Strategy for Preventing and Eradicating Violence Against Women and Girls and the Equally Safe Delivery
Plan, Perth and Kinross Rapid Rehousing Transition Plan, Scottish Social Housing Charter.
Action
No.
Action(s) and
Commitments
for Outcome
Delivery
Baseline Indicator or
Measure Milestone
Target /
End
Point
Action Lead /
Co-ordinator
Progress 2025-2026
2.1 Continue to
develop and
improve
tailored debt
advice and
welfare
assistance to
households
across Perth
and Kinross to
maximise
financial
inclusion
Existing
services 
Number of
households
assisted
Services
Provided 
Households
assisted 
Income
generated via
assistance
• Review existing
services provided and
develop promotional
opportunities to raise
awareness of these 
Ongoing Welfare Rights
(Nicola
Sutherland) 
Housing (Mark
Weir)
• Tenancy Sustainment Fund
provided 591 households with a
financial payment towards their
rent arrears balance. The total
budget was £220K.
• Financial Inclusion Project
delivered by CAB supported a
total of 547 families with a
financial gain for those referred
of £672,778.
• Our Think Yes budget
supported a total of 181
households with a spend of
Page 38 of 140

Page 39

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 19
PKC - GENERAL
£28,175. This £30k fund is used
by Locality Housing Teams to
provide assistance in meeting
the costs of moving into a new
home and the one-off
unexpected costs. The spend
for this fund in 2026-2027 has
agreed to be increased to £60K
due to the ongoing need for
assistance.
• Supported 62 households in the
PRS to sustain their tenancies
through the Private Sector
Sustainment Fund with a spend
of £68,286. 
2.2 Develop a
range of
options that
achieve a
better match of
households to
homes
Current
options
New and
improved
options
available 
• Review mutual
exchange process and
raise awareness 
• Review and enhance
the tenant incentive
scheme to encourage
tenants of large
properties to downsize
2023 
2024
Housing
(Martin Smith) 
Registered
Social
Landlords
Preparatory work has continued to
support the future implementation
of the Tenant Downsizing Scheme.
A key factor in the success of the
scheme is the availability of
attractive alternative housing
options, particularly smaller and
accessible homes. Ongoing
investment in new affordable
housing, buybacks and
regeneration activity is helping to
broaden this choice and create the
conditions necessary to support
greater housing mobility, improve
the use of existing stock and
increase the availability of larger
homes for families on the housing
register. 
Page 39 of 140

Page 40

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 20
PKC - GENERAL
Housing and Social Wellbeing
Committee considered the
introduction of a Mid-Market Rent
(MMR) development by PKC which
is now progressing. 
2.3 Review existing
evidence base
and consider
feasibility of
Build to Rent
models to
deliver high
quality, energy
efficient market
rent options
Existing
Build to Rent
Models
Review and
feasibility study
complete
• Complete review
• Carry out feasibility
study and evaluate
findings
2024
2024
Housing
Strategy
(Ronnie
MacRae)
The review identified Build to Rent
as a form of private market rent
(PRS) that could be a positive
contributor to more diverse market
tenures. Although the regulatory
context has been resolved in favour
of BTR, investment activity is
currently low due to increased
construction costs. Officers will
monitor the national context and
support opportunities in Perth and
Kinross for developments in the
future.
2.4 Continue to
work with
partners to offer
housing and
support options
to refugees in
response to
national
dispersal and
resettlement
programmes
Existing
housing and
support
provision 
Current
national
dispersal
and
resettlement
programmes
Number of
refugees
provided with
accommodation
and support
• Continue to respond
and support
requirements in relation
to national
programmes
Ongoing Housing
(Martin Smith /
Jennifer Kent)
Support provided is as follows:
of 171 positive asylum decisions,
157 were offered housing advice.
• 45 engaged with housing advice
and 25 were offered social
housing, in line with our
statutory duties under housing
and homelessness legislation.
• A further 6 former asylum
seekers were rehoused into
PRS.
• 2 NRPF households (No
Recourse to Public Funds) were
supported into PRS.
Page 40 of 140

Page 41

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 21
PKC - GENERAL
• 42 refugees accessed PRS
housing through other national
resettlement programmes.
2.5 Enhance
personalised
transitional
housing
support to
homeless
households
with moderate
to high support
needs from
temporary or
supported
accommodation
to settled
housing
Existing
house
support
provision
Average
number of
households
with
moderate to
high needs
provided
with support
per annum
Model
developed 
Number of
households
assisted
• Develop and
implement model of
enhanced personalised
transitional housing
support
2023 Housing
(Martin Smith) 
HSCP Planning
and
Commissioning
(Scott
McGoldrick)
While the dedicated Intensive
Housing Support Pilot has ended,
the lessons learned and outcomes
achieved, have been incorporated
into the retendered Floating
Housing Support Service, which
now provides greater flexibility to
support people with higher and
more complex needs
2.6 Increase
engagement
with private
landlords in
Perth and
Kinross to
improve
awareness of
proposed PRS
reforms and
funding options
that may be
available to
invest in energy
efficiency
measures in
PRS homes
Current
Private
Landlord
engagement
forums and
opportunities
Information
source of
reforms and
funding
options
Number of
engagement
opportunities
provided 
Number of
landlords
supported 
Information
source
developed
• Develop and
implement framework
of engagement
opportunities for private
landlords
• Develop robust
information/knowledge
hub in relation to
reforms and funding
options for PRS homes
2024/25 
2024/25
Licensing
(Debra
Gilkison) 
Housing
(Jennifer Kent)
Delays to the heat in buildings
legislation have meant that
engagement about minimum
standards (EPC) have not
progressed until there is clarity
about the direction that this will go
in and any associated funding that
might be available. 
Page 41 of 140

Page 42

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 22
PKC - GENERAL
e.g., Home
Energy
Scotland,
interest free
loans
2.7 Continue to
improve and
further develop
the Council’s
approach to
Rapid
Rehousing via
the Home First
model
RRTP
2019/2024
Successful
delivery of
RRTP Housing
options,
support, and
homeless
prevention
services
materials
available in
range of
accessible
formats and
channels
• Work in partnership to
deliver RRTP
• Lead role in continued
development,
implementation, and
delivery of RRTP
• Sustain or improve
performance in relation
to RRTP locally agreed
targets for;
o Number of
homeless
households
waiting for an
offer of secure
accommodation
o Average length
of stay in
temporary
accommodation
o Average
homeless case
duration
• Provide communication
materials in accessible
formats to raise public
awareness of available
of housing options,
support, and
Ongoing 
Ongoing 
Ongoing 
2024 
Housing
(Martin Smith)
Against a backdrop of significant
national and local housing
pressures, including rising demand,
affordability challenges and
increasingly complex housing
needs, Perth and Kinross has
maintained a stable level of
homelessness presentations. This
is a significant achievement and
reflects the effectiveness of the
Council’s preventative approach,
strong partnership working and
continued focus on providing timely
housing advice, support and
sustainable housing options. The
year-to-date position at September
2025 when Scottish Government
published the last annual
homelessness statistics can be
viewed in this Briefing. 
The Scottish Government has now
confirmed that they will not be
looking for Local Authorities (LA’s)
to update and submit revised
RRTP's. It has been agreed to have
a Homelessness Statement as an
appendix to the next LHS due to be
published in May 2028. 
Page 42 of 140

Page 43

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 23
PKC - GENERAL
homelessness
prevention services
• Review existing advice
and information
• Identify communication
formats and channels
required
• Engage with
stakeholders to
understand
requirements
• Develop and
implement improved
materials, formats, and
channels of
communication 
2024/25 
2024/25 
2024/25 
2024/25 
LHS Outcome 3: Delivering housing for people with varying needs
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Public Health Priority,
National Health and Wellbeing Outcomes, 2022 Tayside HNDA, Good Mental Health for All, Keys to Life, Age, Home and Community –The Next Phase,
Scottish Strategy for Autism, Race Equality Action Plan, Site Standards -Scottish Government guidance on minimum sites standards and site tenants' core
rights and responsibilities, Scottish Social Housing Charter, Improving the lives of Gypsy/Travellers 2019-21, Foundations for well-being: Reconnecting
Public Health and Housing, Perth and Kinross Council Housing Contribution Statement, Perth and Kinross Health and Social Care Partnership Strategic
Plan 2019-2022 / 2020-25, Perth and Kinross Sustainable Inclusive Homes Net Zero Carbon Design Guide 2023, Perth and Kinross Care and Repair and
Scheme of Assistance.
Action
No.
Action(s) and
Commitments
for Outcome
Delivery
Baseline Indicator or 
Measure Milestone
Target /
End
Point
Action Lead /
Coordinator
Progress 2025-2026
3.1 Ensure
planning policy,
placemaking
and housing
investment
Local
Development
Plan 
Delivery of
SHIP including 
Independent
Living projects 
• Prepare LDP3
• Prepare and adopt
PKC Mobility Strategy
• Encourage the pre-
planning of PKC's
2028
Complet
ed 2024 
2023
Property /
Housing
(Nicola Lennon
/ Martin Smith) 
• The Delivery Plan Scheme was
updated in April 2026 to reflect
a shift in timescale. The
Proposed Plan is now
scheduled for a Full Council
Page 43 of 140

Page 44

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 24
PKC - GENERAL
programmes
contribute to
improved and
sustainable
homes, outdoor
space, health,
and wellbeing
for all
households
including those
with varying
needs
Number of
Care and
Repair
Services
Adaptations 
SHIP
completions 
Common
Allocations
Policy 
Delivery Care
and Repair 
Delivery of
Adaptations 
Housing
Options advice
and 
assistance 
provided 
PKC New Build
Design Guide 
property adaptations at
the void stage to
enable early
management of
adaptations budgets
and programme
• Effective review,
referral, prioritisation,
and promotion of
Occupational Therapy
(OT) provision for all
tenures to support the
delivery of property
adaptations. 
• Review Allocation
Policy and Procedures 
• Develop and
implement Dementia
Friendly design for
social rented newbuild
developments
• Develop information,
advice, and support in
relation to provision of
housing and related
services for older
people and those with
dementia which
enhance
independence
• Engagement with
developers to
encourage more
wheelchair accessible
homes delivered 
Complet
ed 2024 
Complet
ed 2024 
2024 
2024 
2025 
HSCP /
Independent
Living Panel 
Place
Strategies
(Nicola
Sworowski) 
Housing
Strategy
(Ronnie
MacRae) 
Registered
Social
Landlords 
approval in Q4 of 2026/27 but
is still currently on schedule for
an adoption by May 2028
(deadline set by Scottish
Government).
• Invested £561,108.30 in PKC
Adaptations: 346 PKC Minor
Adaptations and 88 PKC Major
Adaptations
• Completed 153 major
adaptations and 13 modular
ramps through Care & Repair
with an annual spend of
£731,403.94 for major
adaptations and £37,644.42 for
small repairs. Please note that
this is the maximum available
budget for Care & Repair, as
demand for adaptations
exceeds available budget which
results in some cases being
held over to the new financial
year in order for there to be
capacity in the budget.
• Carried out 2242 Housing
Options advice and assistance
interviews. 
A Complex Housing Solutions
Panel was established to provide a
multi-disciplinary forum to
coordinate, assess, and plan
housing solutions for individuals
whose needs cannot be met
through standard housing routes,
Page 44 of 140

Page 45

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 25
PKC - GENERAL
through the Private
Sector. All tenure
wheelchair (Private)
target to be considered
for LDP3 for all sites.
• Improvements to
Gypsy/Traveller sites
including energy
efficiency chalets and
renewable energy
sources.
• Contribute to enabling
greater tenure choice
and avoid crisis
interventions at a later
stage by testing the
development of flexible
tenure models and
developing a housing
options guide for older
households and those
with dementia 
2025 
2027 
2027 
and who require adapted housing.
This includes people with
combinations of physical
disabilities, learning disabilities and
mental health conditions. The panel
meets fortnightly with core
membership representatives from
PKC Housing, OT, Capital Projects
& New Build, Housing Strategy,
HSCP Social Work, Nursing and
OT, and Addictions / Substances
Use Services & Criminal Justice.
The overall aim of the Panel is to
ensure all involved in delivery of
housing options and opportunities
have an awareness of current
complex cases and their
requirements to enable matching of
properties. 
Gypsy/Traveller Updates:
All 20 chalets at Double Dykes
Gypsy/Traveller site have now
been replaced with energy efficient
chalets, complete with air source
heat pumps and solar PV. Water
infrastructure works are in the final
stages of completion and further
site works including the installation
of street lighting and surfacing of
the existing roadway will then be
able to be completed. 
A Review of Housing for Older
People began in November to plan
Page 45 of 140

Page 46

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 26
PKC - GENERAL
for the housing and support needs
of the ageing population. As part of
this, a multiagency working group
was formed which includes key
PKC, HSCP and NHS leads. The
Review will consider and be
informed by: 
• Current and Future Demand
Needs Analysis (Waiting Lists
and HNDA)
• Current Access into Provision
and opportunities for
redevelopment
• Provision of Support and
Technology
• Communication & Engagement
with current tenants and wider
population. 
3.2 Continue to
improve
working
relationships,
training,
collaboration
and knowledge
exchange on
equalities,
advice and care
and support
services to
enable
independent
living across
Existing
training and
collaboration
opportunities 
Existing
knowledge
exchange 
Register of
information in
relation to
equalities,
advice and
Number of ILP
meetings and
matches 
Number of joint
training
opportunities 
Information/kno
wledge hub
sharing 
Number of
promotional
opportunities to
• Ensure all information
and advice is available
in accessible formats
• Review
Accommodation Guide
to Independent Living 
• Develop
information/knowledge
hub of information and
advice available
• Identify joint training
opportunities and
support delivery of
same
Complet
ed 2024 
Complet
ed 2024 
Ongoing 
Ongoing 
2027
Independent
Living Panel
(ILP)
ILP met 12 times and matched 6
referrals to various accommodation
listed below:
• new build supported core and
cluster housing
• bespoke new build housing
• refurbished housing converted
into supported accommodation
• mainstream housing with
support 
Page 46 of 140

Page 47

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 27
PKC - GENERAL
Perth and
Kinross 
care and
support
highlight ILP
and
Accommodatio
n Guide to
Independent
Living
• Identify collaboration
opportunities across
equalities, care,
support, and
independent living,
carry out feasibility
studies where
appropriate and
delivery of same
where outcomes
indicate these are
required
3.3 Work jointly
with agencies
to ensure future
housing
developments
address
barriers to
employment
and link to
transport and
childcare
provision in the
delivery of
person-centred
care and
support
services, with a
focus on areas
of deprivation
and rural
communities 
Current
workforce
capacity 
Evidence
bases in
relation to
transport and
accessibility
issues in
remote rural
areas 5% 
Rural
communities
HSCP
Workforce
Plan 
Housing
Contribution
Statement
(HCS)
Workforce
capacity
increased 
Evidence of
improved
transport and
accessibility 
Increase in
person-centred
care and
support in
areas of
deprivation and
rural
communities 
Development
of Independent
Living projects 
• Progress core and
cluster projects
through Independent
Living Panel which
provide additional staff
base / office space,
and explore inclusion
of other communal
spaces
• Scope, develop and
implement use of
outreach and digital
services 
• Engage HSCP and
Third Sector in
promotion of PKC
Mobility Strategy
• Update Housing
Contribution Statement
(HCS)
• Work with delivery
partners to ensure that
all new affordable
Ongoing 
Ongoing 
Ongoing 
2024-25 
2027 
Place
Strategies
(Nicola
Sworowski) 
Housing
Strategy
(Ronnie
MacRae) 
HSCP (Zoe
Robertson) 
Independent
Living Panel
(ILP) 
Transportation
and
Development
(Matthew
Davis) 
Project completed by Hillcrest
Homes at Ryan Place in Crieff in
May 2025. It was built on the site of
a former care home deemed
unsuitable for future use and
subsequently demolished. The new
build consists of 9 self-contained
flats across ground floor and first
floor levels, with one of the flats
being a 24/7 on-site staff base.
Each of the homes faces onto a
large open plan communal garden
space. The project will enable the
move of several residents
previously living in other
accommodation that did not suit
their changing needs. Support will
be provided through Hillcrest
Futures who are well established in
the area. 
Progressing 1 project included in
the SHIP for 2027-28 which will
Page 47 of 140

Page 48

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 28
PKC - GENERAL 
PKC New
Build Design
Guide 
Implementation
/ Adoption of
PKC New Build
Design Guide 
Implementation
of PKC Mobility
Strategy 
homes meet standards
set out in 4.1 External
Spaces of PKC Net
Zero Design
Guide/Perth and
Kinross Standard
2023.
• Take account of
workforce capacity,
transport and
accessibility issues
and site locations in
preparation of LDP3
and 20 min
neighbourhood
analysis 
2027
Registered
Social
Landlords 
consist of 8 homes for independent
living to be located in Aberfeldy. 
Mobility Strategy implementation
update: The Council’s Public
Transport Transformation Project
Steering Group is reviewing bus
powers available to PKC and
options for future bus network
provision, which has the potential
to meaningfully improve access to
employment and services. The
Outline Business Case is due to be
presented to Full Council in
September 2026. 
A monitoring and evaluation plan
has been approved which includes
baseline data on the % of the rural
population that can access
employment, further education and
shops by public transport within
30/40/60 minutes 
Housing Contribution Statement
(HCS) now sits within the IJB
Strategic Plan 2024-27 on p56-57,
with the next update expected in
2028.
3.4 Continue to
work
collaboratively
to promote the
benefits,
increase
Current
assistive
technology in
use within
housing 
Information/kno
wledge hub in
relation to
assistive
technology 
• Develop
information/knowledge
hub in relation to
assistive technology
• Consider / create
development of
Ongoing 
Complet
ed
HSCP TEC
(Anthony
Clark)
The HSCP TEC programme
continued to support people in
Perth and Kinross to live safely and
independently at home through
Community Alarm and Telecare
provision, digital telecare
Page 48 of 140

Page 49

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 29
PKC - GENERAL
awareness and
make better
use of
technology
within a
housing setting
to enable
people to live
comfortably
and
independently
in their own
home
Number of
households
receiving
assistive
technology
Information
and advice
guide
developed 
‘showcase’ property to
demonstrate assistive
technology available
• Develop and promote
advice and information
guide  Ongoing
infrastructure, and wider
awareness of assistive technology. 
Plans are now underway to
centralise the installation and
maintenance of the 400+ housing
users of telecare with the 4000+
Community Alarm users across
PKC, providing an integrated
approach to the management and
maintenance of telecare alarms. 
The new Health and Social Care
website was launched, improving
the quality and accuracy of
information available, including the
enhanced use of social media.
Attended community and NHS
events promoting the use of TEC to
carers, the cared for, and
professional support groups. 
Engagement was undertaken with
Community Alarm, Telecare and
Finance colleagues to improve
future reporting, asset planning and
sustainability of TEC services. 
3.5 All affordable
homes are built
to revised HfVN
standard and
New Build
Design Guide,
with a minimum
10% of all
affordable
Revised HfVN
Standards 
Affordable
Completions 
Average
wheelchair
Completions
built to revised
HfVN
Standards 
Wheelchair
Completions 
• 10% wheelchair
homes delivered
• Determine future
targets across all
particular requirements
through collaboration
with key partners and
service users (person
centred)
Ongoing 
Ongoing 
Housing
Strategy
(Ronnie
MacRae) 
Property
(Nicola
Lennon) 
• 9 wheelchair completions (9
RSL)
• 10 ambulant completions (RSL)
• Housing OT undertaken 125
assessments for wheelchair
users and 24 people have been
rehoused into Council (5) and
RSL (19) housing.
Page 49 of 140

Page 50

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 30
PKC - GENERAL
homes being
built to
wheelchair and
adaptable
standard
completions
per annum 
Existing
flexible tenure
models 
Need and
demand for
flexible tenure
models
Research and
testing
complete
• Test and research
flexible tenure models
for households with
varying needs to
create individual
housing journeys as
their needs and
circumstances change
• Implementation of
revised Housing for
Varying Needs (HfVN)
standard and New
Build Design Guide
Ongoing 
2027 
Registered
Social
Landlords
• See Action 3.1 Ongoing
forecasting exercise with
Housing and HSCP to
determine level of need,
including targets through
Complex Housing Solutions
Panel and ILP.
• Whilst PKC submitted a
response to the Scottish
Government Housing for
Varying Needs (HfVN)
Proposed Guidance
Consultation (extended to Dec
2023), we have been waiting
from that point for further
guidance or implementation to
adopt. 
3.6 Consider
widening the
Buyback
Scheme to
purchase
‘particular /
adaptable
homes’ for
households
with varying
needs to
ensure existing
adapted
properties are
matched to
households
with specific
requirements
Number of
households
whose needs
are currently
unable to be
met
Number of
properties
purchased to
meet identified
need 
Number of
households
receiving
‘particular /
adaptable
homes’ that
meets their
needs
• Review scope of Open
Market Purchase
Scheme to include
purchases of
’particular / adaptable
homes’ which are non-
ex-Council properties
• Identify existing
adapted properties on
open market for sale
• Identify existing private
sector properties with
adaptations
• Identify number and
location of households
whose needs cannot
be met through
existing social rented
2023 
Ongoing 
Ongoing 
Ongoing
Housing
Options
(Jennifer Kent) 
Buyback
Officer 
Occupational
Therapy
The establishment of the Complex
Housing Solutions Panel has
improved understanding of demand
for adapted and specialist housing.
Further work is underway to assess
how the buyback programme can
contribute to meeting identified
needs.
Page 50 of 140

Page 51

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 31
PKC - GENERAL
stock or by an in-situ
solution 
3.7 Work with
Gypsy/Traveller
community
members to
have a better
understanding
of their
accommodation
needs and
preferences
and explore
and develop
workable
solutions
HNDA
Specialist
Provision
Chapter 
Scottish
Government
GT Count 
Local
authority GT
Information
(LA Sites,
Unauthorised
Encampments
etc) 
Gypsy/Travell
er Action Plan
Number of
engagement
opportunities 
Improved
understanding
of needs and
preferences 
Workable
solutions in
place
• Continue to review
progress of the
Gypsy/Traveller Action
Plan
• Continue to develop
engagement
opportunities with GT
community
• Organise engagement
events/surveys
• Scope out
accommodation needs
and preferences along
with solutions
• Pilot delivery of
proposed solutions
where feasible
• Pursue the
establishment of a
transient site for
Gypsy/Travellers
Ongoing 
Ongoing 
Ongoing 
2024-27 
2024-27 
2027 
2027 
Housing
(Andrea
McCallum) 
Planning,
Transport and
Housing
Strategy
(Brenda
Murray) 
Environmental
Health (Kirsty
Steven) 
Equalities
(David
McPhee)
The Gypsy Traveller Action Plan
continues to be reviewed and
updated. 
Consultants Craigforth with
assistance from the Council,
undertook site visits to complete in-
person questionnaires with
participants at Double Dykes and
Bobbin Mill. An online survey was
also made available for those who
preferred to participate online. A
total of 36 households participated,
both from those in housing and on
private sites. 
3.8 Continue to
improve PKC's
central housing
database (NEC
Housing) with
information of
all existing
property
adaptations
and
accessibility
NEC Housing
Property
Information
Improved
intelligence
gathering and
reporting via
NEC Housing
• Continue to gather
intelligence and
populate NEC Housing
with existing property
adaptations and
accessibility features
• Enhance processes
and procedures to
ensure that the
allocation of properties
takes account of
Ongoing 
2025
Performance
and Business
(Linda
Montgomery) 
Housing
(Jennifer Kent)  
Work ongoing via the Complex
Housing Solutions Panel to identify
applicants with specific housing
needs which cannot be met
through existing stock. Work
underway to ensure that these
applications can be identified as
required. Progress made with IT to
develop a totalmobile solution to
record voids assessments carried
out by the housing OT and to
Page 51 of 140

Page 52

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 32
PKC - GENERAL
features to
maximise the
use of limited
resources and
match suitable
properties to
appropriate
households
system-based
intelligence about
adaptations and
accessibility features
record completed Housing Needs
Assessments. 
LHS Outcome 4: Delivering quality homes with affordable warmth, zero emissions and SMART Technology
Supporting National Priorities, Plans and Targets and links to Corporate Plan and Local Outcomes Improvement Plan: Local Heat and Energy
Efficiency Strategies (LHEES), Sustainable Housing: Fuel Poverty and Climate Change Advice Note, Scottish Government’s Energy Efficient Scotland
Route Map, Fuel Poverty (Targets, Definition, and Strategy) (Scotland) Act 2019, Climate Action Plan (December 2021), Scottish Housing Quality
Standard, Energy Efficiency Standard for Social Housing, Scottish Social Housing Charter, Scottish House Condition Survey, Local House Condition
Survey (Council Sector).
Action
No.
Action(s) and
Commitments
for Outcome
Delivery
Baseline Indicator or Measure Milestone
Target /
End
Point
Action Lead /
Co-ordinator
Progress 2025-2026
4.1 Support
implementatio
n of Perth and
Kinross Local
Heat and
Energy
Efficiency
Strategy
(LHEES) 
Current
Projects 
LHEES
Delivery Plan 
Energy
Efficiency of
Council
housing stock 
Energy
Efficiency of
Delivery of Actions
within LHEES
Delivery Plan 
• LHEES Delivery Plan
Developed
• Work in partnership to
deliver identified
projects and contribute
to delivery and
implementation of
LHEES Delivery Plan 
• Improving energy
efficiency across all
tenures by maximising
the use of national
funding programmes 
2023 
Ongoing 
Ongoing
Climate
Change and
Sustainable
Development
(Divindy
Grant /
Shelley
McCann) 
In support of LHEES Delivery
Plan action to mobilise
partners and attract public
and private investment, PKC
approved procurement of a
Strategic Energy Partner
(SEP). The SEP will support
delivery of pipeline of low-
carbon energy projects
identified through LHEES and
Local Area Energy Plan
(LAEP), helping to achieve
key strategic objectives
relating to carbon reduction,
Page 52 of 140

Page 53

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 33
PKC - GENERAL
PRS
Properties 
Current
funding
opportunities
fuel poverty and energy
resilience. 
PKC currently developing
business case to inform
procurement of a single
private-sector SEP. A Board
has been established and
meets monthly to oversee
and progress this work. 
Working alongside Scottish
Futures Trust and legal and
commercial advisors, PKC is
developing a Strategic
Outline Case and defining a
clear, deliverable pipeline of
projects for the partnership.
This builds on significant
technical and commercial
development work already
undertaken by PKC across
heat networks and the wider
strategic energy programme.
In particular, technical studies
previously supported through
the Heat Network Support
Unit (HNSU) have identified a
preferred heat network
opportunity. 
The Council is also exploring
the development of smaller
rural heat networks through
the SEP model. This
Page 53 of 140

Page 54

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 34
PKC - GENERAL
approach will enable
coordinated delivery and
financial bundling of projects,
improving their attractiveness
to external investors and
increasing deliverability at
scale. Through the
partnership, the Council will
leverage its assets, expertise
and support services while
enabling project delivery
through appropriate private-
sector partners. The Council
has submitted an Expression
of Interest to Great British
Energy identifying projects for
public funding. 
RSL partners have:
• installed 114 PV panels
on existing stock.
• replaced old electric
storage heaters with high
heating retention in 31
properties. 
4.2 Expand
capacity of
energy and
fuel poverty
advice
services and
improve
availability of
information on
Current
information on
support
services/sign
posting in
relation to
energy
efficiency and
Improved information
and advice 
Accessibility, format
and channels for
advice and
information 
• Target advice and
support for landlords
on how to access
sources of funding
combined with
enforcement of the
new standards when
they come in 
Ongoing 
Ongoing
Property /
Housing
(Nicola
Lennon /
Jennifer
Kent) 
SCARF 
In 2025/26, the CC funded
Scarf energy advice service
was focused on low EPC
rated homes (Energy
Performance Certificate E, F
and G). The scope of this
service was to improve
energy efficiency ratings by
facilitating applications to the
Page 54 of 140

Page 55

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 35
PKC - GENERAL
fuel poverty
and energy
efficiency
measures
available to
front line staff,
service
providers and
to households
most in need
property
condition
Current
supports in
relation to
energy
efficiency and
property
condition
Number of
households
currently
accessing
information
Number of
households accessing
information and
advice 
• Target income
maximisation and fuel
poverty support to
households living in
PRS 
• Deliver heating and
energy efficiency
advice and support
directly and through
partners as aligned
with the LHEES
• Explore existing data
and insight to develop
a risk framework to
households who are
financially vulnerable
and offer appropriate
support 
• Develop process to
record number of
households accessing
information and advice 
Ongoing 
Ongoing 
2024 
The HEAT
Project 
Energy
Advice
Network 
Child Poverty
(Margaret
Lynch) 
Data
Services
(Ewan
Walker) 
ECO4 scheme. This has
significant impacts on
removing households out of
fuel poverty while also
reducing emissions due to
retrofitting properties. 
A total of 1,331 residents
were engaged through
letters, calls, and community
events. The financial cost of
the installed measures is
estimated to be around
£1,256,376. 
The total 389 home visits
delivered personalised, in-
home advice, leading to 301
referrals for grants and
funding - a 77% conversion
rate from visit to action. 
More specifically, 76 referrals
were made to the ECO4
Scheme while 225 referrals
were made to the
Help4Homes Solar PV
installations scheme that was
introduced later in the year.
Funded installation are
delivering £110,972 in annual
energy bill savings and 903.3
tonnes of carbon reduction.
Additionally, advice provided
during home visits, and
events is generating an
Page 55 of 140

Page 56

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 36
PKC - GENERAL
additional £95,366 in
estimated annual savings
and 233.3 tonnes of carbon
reduction through improved
energy use. 
In 2025/26, the SCARF
Home Energy Advice Team
project, funded by Housing &
Communities, provided
energy advice services to a
total of 519 households
through Home Visits and
remote Home Visits. The
advice provided resulted in
£168.00 of energy debt being
written off and £47,277 of
Fuel Bill discounts being
received from the Energy
Redress Fund; overall, the
energy efficiency advice has
generated the equivalent
saving from fuel bills of
£55,131.00. The total energy
cost savings from the energy
advice has provided
£160,852.98 in energy cost
savings and a total carbon
reduction of 408.45 through a
reduction in energy usage. 
4.3 Build an
understanding
of the current
and future
To be
developed
To be developed • A number of studies
are underway at a
national and regional
level to review the
Ongoing
/ 2027
Employability
(Andy Brown) 
Housing (Property) Capital
Projects & New Builds Team
have:
Page 56 of 140

Page 57

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 37
PKC - GENERAL
skills and
training
requirements
to “green” the
construction
sector to
ensure we can
deliver quality
homes with
affordable
warmth, zero
emissions and
SMART
technology. 
Work in
partnership
with the CITB,
local
construction
companies
and training
providers
including Perth
UHI to ensure
Perth and
Kinross is well
placed to
provide
appropriate re-
skilling and
training
opportunities.
Green Skills
opportunity and to
define what is required
for various sectors
including construction.
Once these have
reported and further
analysis has been
undertaken at a local
level more milestones
can be determined.
Property /
Housing
(Nicola
Lennon /
Elaine Ritchie
/ June
McColl) 
Registered
Social
Landlords 
Housing
Strategy
(Ronnie
MacRae) 
Climate
Change and
Sustainable
Development
(Divindy
Grant)
• installed 17 air source
heat pumps within
existing housing stock
• 49 properties from the
existing stock had old
electric storage heaters
replaced with high heat
retention Dimplex storage
heating
• 12 new properties built in
Crieff with ASHP
• 4 new builds at
Blairgowrie built with
solar PV panels
integrated into the roof
construction and ASHP
heating installed. 
The Property (Housing)
Capital Projects & New
Builds Team have engaged
with Dundee & Angus
College and are attending
their Quarterly Employers
Curriculum/Innovation
Steering Group meetings to
discuss and consider how to
collectively meet the skills
demands of Net Zero. This
steering group has been set
up as part of the Tay Cities
Deal. 
The team have also
completed Carbon Literacy
Page 57 of 140

Page 58

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 38
PKC - GENERAL
training provided by inhouse
Climate Change colleagues. 
4.4 Target
investment to
homes based
on evidence
and
intelligence
gathered 
Identify
existing
information
(Home
Analytics,
SHQS sources
and
information
provided)
Forthcoming
Information sources
identified (LHCS,
Housing IoT data,
2022 Census, Cold
Home App data, etc.) 
Improved intelligence
(Gypsy/Traveller
Consultation, energy
advisors intelligence
etc.)
• Identify and quantify
existing information
sources
• Integrate existing and
forthcoming
information sources
• Improve understanding
of intelligence
available, identify gaps
and solutions to
address these
• Develop a delivery
framework, integrating
the outputs of the Risk
framework in Action
4.2
• Wider policy review
update to map national
and local policies,
targets and strategies
that are linked to,
impact, or could be
impacted by LHS
(including LHEES,
Smart Local Energy
Systems (SLES), LDP,
Local Area Energy
Plans (LAEP) etc
• Align evidence
underlying these
policies to support
2023 
2023 
2023 
2023 
2023 
2023
Property /
Housing
(June McColl
/ Nicola
Lennon) 
Climate
Change and
Sustainable
Development
(Divindy
Grant /
Shelley
McCann) 
Strategic Energy Programme
evidence is underpinned
through the LHEES and
LAEP strategies; the Capital
Investment Programme sets
out the 30 year plan for
investment, but is driven by
the requirement to meet
Scottish Government targets. 
Information is collected and
fed into the EST Home
Analytics platform and the
information on improvements
to the properties integrates
with fuel poverty data to give
a wider view of social and
economic factors. 
Capital programme work is
also informed by the use of
the SAVA Energy Modelling
tool which can model
different scenarios to
investigate the best value
options for the social housing
properties. Work is ongoing
to improve the level of
properties with up-to-date
EPC's that will better inform
the investment in these
properties. 
Page 58 of 140

Page 59

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 39
PKC - GENERAL
policy integration and
delivery  Programme work continues
to develop an agile and
reactive Delivery Plan for
targeting actions and triaging
a pipeline of energy projects
through to business case
aligned to Regional Energy
Strategic Plans and DNO grid
investment planning via the
Local Energy Network
Accelerator (LENZA
Platform) Ofgem funded
platform. 
Work to improve energy
digital infrastructure and
publishing in the Council
supported by the Corporate
Data Team. Involves data
improvements, aggregation,
update and publishing
including actions to identify
data gaps. 
4.5 Undertake a
review of the
Council’s
Scheme of
Assistance for
private
homeowners
considering
legislative
changes
Scheme of
Assistance 
Number of
households
assisted
annually 
Average
Annual Spend
Scheme of Assistance
Reviewed 
Number of
households assisted 
Annual Spend
• Review Scheme of
Assistance 
Complet
ed 2024
Housing
(Martin
Smith) 
Environment
al Health
(Kirsty
Steven) 
The Missing Shares Service
received 63 new enquiries
with 31 ongoing from
previous years, and 52
enquiries resolved/closed in
this period. A total of 10
buildings were supported with
Missing Shares Payments in
this period resulting in a
repair value of £194,088 with
a further 13 buildings
Page 59 of 140

Page 60

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 40
PKC - GENERAL
Missing
Shares
Officer 
supported with completing
repairs with a total value of
£144,720 with no Missing
Shares required 
Missing Shares was
approved continued use of
budget for recoverable spend
as the original amount
approved at committee for
the original pilot term until
23/24 to introduce the service
in 2021 has been exceeded
in 25/26. The service
continues to collect data to
support reporting to
committee at the end of the
extended pilot period in 27/28
to determine future plans for
the service.
4.6 Build new
affordable
housing to
enhanced
energy
efficiency
standards and
encourage
private
developers to
do so too
Newbuild
completions
(SR and
Private)
Newbuild
completions to
Gold Standard
(SR and
private)
LDP
Newbuild completions
(SR and Private)
Increase in newbuild
completions to Gold
Standard (SR and
private)
• Implement Design
Guide to ensure all
new affordable
housing meet Gold
Standard 
• Ensure Design Guide
continues to meet SG
guidance on
sustainability
standards and
principles
2023/24 
2027 
Property
(Nicola
Lennon) 
Housing
Strategy
(Ronnie
MacRae)
Completion of 24 PKC
affordable housing new
builds in 2025/26. These
properties were off-the-shelf
properties and whilst these
homes do not fully meet the
Council's enhanced Design
Guide standards, they meet
current Building Regulations
and were acquired following
consideration of strategic
housing need, value for
money and housing supply
priorities. 
Page 60 of 140

Page 61

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 41
PKC - GENERAL
These properties meet
current Building Regulations
but our Design Guide seeks
to exceed these. This is the
only reason we were willing
to accept them and the
Strategic Affordable Housing
Board takes the final decision
on whether to accept them;
our Design Guide notes that
we need to meet Gold
Standard - the off the shelf
properties meet Bronze. 
RSL partners have:
• built 7 properties with air
source heat pumps
• built 32 properties with
electric storage heating 
4.7 Work with
Scottish
Government
and other
agencies to
improve digital
infrastructure
particularly in
rural
communities
Existing digital
connectivity
across rural
communities 
Increased number of
rural households
digitally connected
• Explore digital
infrastructure
opportunities in rural
communities
Ongoing Economic
Development
(Kirsty
Easton) 
The Community Learning and
Development Team
supported 819 learners to
improve their literacy and
digital skills. Demand for
digital learning continues to
be high. 
Consultation on priorities for
delivery took place with 3rd
sector partners in the Adult
Learning Partnership.
4.8 Take action to
ensure that
landlords and
Existing flood
and climate
change
Risk assessment of
flooding and climate
• Understand existing
flood and climate
change risks
Ongoing 
Ongoing
Structures
and Flooding
Progress continues through
cross-service work to
understand flood and climate
Page 61 of 140

Page 62

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 42
PKC - GENERAL
households
are housing is
resilient to the
possible
effects of
climate change
and flooding
and makes a
positive
contribution to
reducing the
risks and
impacts of
flooding and
climate change
in the longer
term. 
position within
PKC 
change in relation to
Housing complete
Mitigations identified
and action plan
developed
• Identify mitigations and
develop and
implement action plan
• Ensure Design Guide
continues to reflect
ongoing challenges as
a result of climate
change 
Ongoing 
(Rick
Haynes) 
Housing
(June
McColl) 
Scottish
Flood Forum
change risks affecting homes
and communities. Existing
flood risk information is being
used to inform housing,
planning and resilience
activity, including promotion
of the PKC Property Flood
Resilience Grant to support
eligible property owners to
install measures that help
reduce the impact of flooding.
Consideration continues to
be given to mitigation
measures for new and
existing homes.
4.9 Develop and
deliver
exemplar pilot
projects that
incorporate net
zero planning
across a range
of sectors
including fabric
first, retro
fitting and
transport
planning etc. 
Identify potential
partners and projects
Pilot exemplar
projects
• Identify potential
partners and projects
• Explore feasibility of
potential projects
• Pilot feasible projects
and evaluate findings
Ongoing 
Ongoing 
2024-27
Property 
(Nicola
Lennon) 
Housing
Strategy
(Ronnie
MacRae)
Pilot project was developed
at Glengarry Road, Perth to
investigate alternative
solutions to energy efficiency
in a 4-in-a-block flatted non-
traditional construction block
of social housing properties.
The block was upgraded
using a whole-house retrofit
approach that combined
energy efficiency
improvements with full
refurbishment. 
The project addressed poor
energy performance by
installing enhanced
Page 62 of 140

Page 63

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 43
PKC - GENERAL
insulation, modern heating
systems and renewable
technologies, enabling the
homes to achieve EPC Band
B. Alongside improving
thermal comfort and reducing
energy costs for tenants, the
project also trialled different
low-carbon heating solutions
across the block, generating
evidence to inform future
investment decisions and
supporting wider objectives
on carbon reduction, fuel
poverty and improving
housing quality. 
The data from these
properties is being continually
monitored and will be utilised
to inform future programmes
and develop lessons learned
for considering for future
projects within a wider
delivery programme. 
4.10 Set out plans
to address any
local authority
domestic stock
where
abeyances
(delayed works
due to human
or social
SHQS
Performance
2021/22
Existing
abeyances
Existing
exemptions 
Improved SHQS
Performance 
Reduction in
abeyances 
Reduction in
exemptions 
• Develop and
implement plan for
addressing SHQS
abeyances (for social
reasons) and
exemptions (subject to
technical,
disproportionate cost
Ongoing Property 
(Nicola
Lennon) 
Registered
Social
Landlords
In 2025/26, although we have
continued to make progress,
the PKC SHQS compliance
rate has remained relatively
static at 79.73%, compared
with 80.28% in 2024/25,
meaning 6,672 homes now
meet the SHQS. This
represents an improvement
Page 63 of 140

Page 64

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 44
PKC - GENERAL
factors) or
exemptions
are applied, to
meet the
Scottish
Housing
Quality
Standard
(SHQS) 
or legal reasons) in
Council stock
of 68 properties within a
single year, and our housing
stock numbers have
increased by 142 properties,
mainly due to investment in
our buyback programme
which has had an impact on
our progress given the
condition and standard of
some of properties we are
buying back. 
Data is provided on an
annual basis at the time of
the ARC return and available
to view at the Scottish
Housing Regulator 
Work to address SHQS
failures or abeyances is
always ongoing; it is part of
managing our Council
housing stock and can
change for various reasons.
The information collated for
this Action is also provided
and monitored as part of the
SHQS ARC return submitted
at the end of May every year. 
The majority of our SHQS
failures relate to EESSH; we
have a planned programme
to address the EPC Band E
and F properties and have
now moved on to also
tackling those that are a low
Page 64 of 140

Page 65

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 45
PKC - GENERAL
EPC Band D. There will be
some Band E and F
properties that we are unable
to improve given challenges
such as lack of tenant
access, reluctance to remove
solid fuel heating systems
and due to the technical
nature of the properties e.g.
Listed Building requirements. 
Proposals for the targeted
improvements to the
remaining EESSH failures
are included within the
Business Cases being
developed for the Strategic
Energy Partner (SEP); it is
not anticipated that the SEP
will be appointed Mid 2027,
therefore the progress on
reducing the number of
EESSH failures and
improving the overall SHQS
figure will remain piecemeal
and challenging, unless
approvals to develop
programmes of work are
given in advance of the SEP
appointment. 
4.11 Use the
learning from
the existing
Internet of
Pilot learning
collated
Scaled-up Plan
developed
• Scaled-up plan
approved
• Scaled-up plan
implemented
2024 
2026
Housing
(June
McColl) 
The Housing Service also
has approximately 379
households with AICO
environmental sensors
Page 65 of 140

Page 66

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                                                                                                 46
PKC - GENERAL
Things pilot
‘Monitoring
temperature
humidity and
CO2 in 50
homes to help
tenants
manage their
energy, reduce
fuel poverty
and maintain
their homes
well’ with a
view to scale it
up.
Tenant
Liaison
Officer 
installed, mainly within multi
storey blocks as part of the
Capital Multi Storey
Refurbishment Project to
evidence impact of the
measures installed at these
blocks.
4.12 Facilitate the
delivery of low-
cost, high-
speed
broadband into
social housing
in partnership
with the private
sector and
investors using
fibre
infrastructure
roll-out. 
TBD % of social housing
with access to gigabit-
capable broadband
• 10% of social housing
by
• 25% of social housing
by 
• 50% of social housing
by
• 60% of social housing
by
2024 
2025 
2026 
2027
Economic
Development
(Kirsty
Easton) 
Registered
Social
Landlords
86 new build homes
delivered by 2 RSL partners
(Kingdom HA & Caledonia
HA) have been built with fibre
to the premises.
Page 66 of 140

Page 67

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                     47
PKC - GENERAL
Glossary 
Acronym / Word
/ Term
Definition / Meaning
Accessible
home
Home with additional, non-standard features that meets the needs of
the occupier.
Affordable
home /
Affordable
housing
Scotland’s fourth National Planning Framework defines this as “Good
quality homes that are affordable to people on low incomes. This can
include social rented, mid-market rented, shared-ownership, shared
equity, housing sold at discount (including plots for self-build), self-build
plots and low-cost housing without subsidy.”
Affordability Rents are considered to be affordable if a household pays no more
than 25%-35% of their income on housing costs
AHP Affordable Housing Programme
AHSP Affordable Housing Supply Programme
Ambulant Non-wheelchair adapted housing for people with disabilities
ARC Annual Return on the Charter
ASB Anti-Social Behaviour
ASHP Air Source Heat Pump
Below Market
Housing
Property where the market rent is below the average market rent for the
size and location
Brownfield Defined by the Environmental Protection Agency as “a property, the
expansion, redevelopment, or reuse of which may be complicated by
the presence or potential presence of a hazardous substance,
pollutant, or contaminant.” The term typically describes areas of land
that were once used for commercial or industrial purposes such as
factories and warehouses.
CAB Citizens Advice Bureau
CAP Common Allocations Policy
CHR Common Housing Register
CLH Community Led Housing Projects are where the following three
characteristics are in place: 1) Open, meaningful, community
participation and consent takes place throughout the process 2. The
community groups owns, manages, or stewards the homes in
whichever way they decide 3) The housing development is of true
benefit either for the local community, a specific group of people (an
intentional community), or both. These benefits should be legally
protected in perpetuity.
Complex Needs As defined by the Scottish Government ‘Coming Home’ Report 2018,
this is used to refer to people with learning disabilities who also have
one or more of the following:
• Severe challenging behaviour (it is noted that this may include
behaviour, which is not severe in itself, but becomes severe due to
its high frequency)
• Forensic support needs
• Mental health needs
• Autism
• Profound and multiple disabilities 
Core and
Cluster 
Typically, a cluster of 6 to 8 homes for people with independent living
needs with a core staff based providing 24/7 shared support.
COSLA Convention of Scottish Local Authorities
Page 67 of 140

Page 68

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                     48
PKC - GENERAL
Acronym / Word
/ Term
Definition / Meaning
CPP Community Planning Partnership
EBI Estate-Based Initiatives
EESSH Energy Efficiency Standard for Social Housing
EHI Empty Homes Initiative
EPC Energy Performance Certificate
EqIA Equalities Impact Assessment
EST Energy Savings Trust
FIT Feed In Tariff
Floating
Housing
Support
services
A short-term, flexible, responsive service aimed at enabling vulnerable
individuals who are at potential risk of losing their tenancy to live
independently or to maximise their independence.
GIRFEC Getting it Right for Every Child
Greenfield A greenfield site is an undeveloped land that can be used for
commercial or residential development.
HAG Housing Association Grant
HCS Housing Contribution Statement
HEAT Home Energy Advice Team commissioned by PKC and provided by
SCARF
HEEPS-ABS Home Energy Efficiency Programmes Scotland - Area-Based Scheme
HES Home Energy Scotland
HfVN Housing for Varying Need
HHCRO Home Heating Cost Reduction Obligation
HIBS Heat in Buildings Strategy
HLR Housing Land Requirement
HMA Housing Market Area
HMO House in Multiple Occupation
HNDA Housing Need and Demand Assessment
Home First
model
In Perth and Kinross, Home First provides a settled home as a first
response when homelessness occurs with the aim of minimising the
impact of homelessness for individuals and families, avoiding the
stigma, cost, and uncertainty of temporary accommodation where
possible. See Advice for people who are or become homeless - Perth
and Kinross Council (pkc.gov.uk)
HOSA Housing Options Self-Assessment Tool
Housing Stock The total number of houses and flats in an area.
HRA Housing Revenue Account
HSCP Health and Social Care Partnership
HST The Housing Supply Target is a policy view of the number of homes
PKC has agreed will be delivered in each housing market area over the
periods of the Local Development Plan and the Local Housing Strategy.
It considers wider economic, social, and environmental factors, issues
of capacity, resources, and deliverability.
ILP Perth and Kinross Independent Living Panel
IOT Internet of Things
Page 68 of 140

Page 69

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                     49
PKC - GENERAL
Acronym / Word
/ Term
Definition / Meaning
Intermediate
Housing
Refers to privately rented housing that is below the cost of market
rented housing but above the cost of housing for social rent.
Sometimes called mid-market rent or below market rent.
LAEP Local Area Energy Plans
LCHO Low Cost Home Ownership
LDP Local Development Plan
Learning
Disability
The keys to life explains this is a significant lifelong condition which is
present prior to the age of 18 and which has a significant effect on a
person’s development. People with a learning disability will need more
support than their peers to:
• Understand information
• Learning skills and
• Lead independent lives
LHA Local Housing Allowance
LHCS Local House Condition Survey
LHEES Local Housing Energy Efficiency Scheme
LHS Local Housing Strategy
Mainstream
Housing
General needs housing is housing with no adaptations or particular
features and can be of various sizes and types.
MAPPA Multi-Agency Public Protection Arrangements
Market Housing Housing in a community which has rent or payment at a rate at or near
Average Market Rent
Missing Share Local authorities have the power to pay 'missing shares' when 1) one or
more owners are unwilling or unable to pay 2) the owner cannot be
found after reasonable enquiries 3) it is unreasonable to ask an owner
to pay where a minority of owners do not pay their share of common
repairs
MMR Mid-Market Rent
OT Occupational Therapy
Out of Area This is when a person with support needs is living within a placement
that is not within their own funding authority and could include living in
either an NHS or private hospital.
Owner-occupied Property which is lived in by people who have bought it rather than
people who pay rent
PRS Private Rented Sector
RHI Renewable Heat Incentive
RRTP Rapid Rehousing Transition Plan
RSL Registered Social Landlord (Housing Association)
RTO Registered Tenant Organisation
SCARF Save Cash and Reduce Fuel
SDP Strategic Development Plan
SDS Self-Directed Support
Self-Build Homes built or commissioned by individuals or groups of individuals for
their own use. Homes built this way, offer a unique alternative to
standard market housing, and offer the opportunity to create innovative,
greener, and more affordable homes than currently offered through
standard housing options.
Page 69 of 140

Page 70

Perth and Kinross LHS Annual Progress Report 2025-2026 September 2026                     50
PKC - GENERAL
Acronym / Word
/ Term
Definition / Meaning
SG Scottish Government
SGN Scottish Gas Networks
SHCS Scottish House Condition Survey 
SHIP Strategic Housing Investment Plan
SHQS Scottish Housing Quality Standard. The SHQS was introduced in 2004
and is the main way to measure housing quality in the social rented
sector. It is the minimum standard which all social rented properties
must meet
SHR Scottish Housing Regulator
Shared Equity A type of housing tenure where ownership is shared between the
occupier and a third party, usually a council or Scottish Government
SLES Smart Local Energy Systems
SMART
technology
Self-Monitoring, Analysis, and Reporting Technology include sensors
and devices, systems and applications that use WiFi and technology to
help support with a range of housing related services which can range
from everyday practical tasks, independent living, and ensuring the
home environment is energy efficient. 
Social Housing Properties provided by local authorities or Housing Associations which
are more affordable than housing on the open market.
STLs Short Term Lets
Supported
Housing
This is an umbrella term used to describe a wide range of housing-
based options for people with support needs. See Accommodation
Guide to Independent Living for more info.
TEC Technology Enabled Care
Tenure Refers to legal method of housing ownership and occupation, for
example, owner occupied, private rented, below market rent, shared
equity, social rent, shared ownership. ‘All tenure’ refers to all housing
assets across the tenure categories listed above
VAWP Perth and Kinross Violence Against Women Partnership 
Page 70 of 140

Page 71

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________  
Committee or Board: Housing & Social Wellbeing Committee 
Date of Meeting: 30 September 2026 
Report Title: Strategic Housing Investment Plan 2026/27 – 2030/31 
Report Number: 26/264 
Report Author: James Ross, Affordable Housing Enabler,
housingstrategy@pkc.gov.uk 
Organisational Lead: Serge Merone, Strategic Lead, Economy,
Development & Planning and Elaine Ritchie, Strategic
Lead, Housing & Communities
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to seek approval of the Strategic Housing
Investment Plan 2027/28 – 2031/32, which is set out in appendix 1. The plan
sets out the investment priorities for affordable housing over a 5-year period
from 2027/28. 
1.2 Sections 
The report is structured over the following sections: 
1. Purpose
2. Recommendations
3. Background/Context
4. Proposals
5. Conclusion
6. Impact Value Assessment
7. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Approve the content of the Strategic Housing Investment Plan 2027/28 –
2031/32 (Appendix 1) and its submission to the Scottish Government.
7
Page 71 of 140

Page 72

2.2 Give delegated authority to the Strategic Lead for Housing and Communities
and the Strategic Lead for Economic, Development and Planning in close
liaison with the Strategic Affordable Housing Board to continue ongoing
development of the SHIP 
3. Background/Context 
3.1 The context for the Strategic Housing Investment Plan (SHIP) is set within the
national context of Housing to 2040 which is the Scottish Government’s long-
term vision and strategy for housing, which seeks to ensure that everyone has
access to a safe, energy efficient home that is affordable and meets their
needs in the place they want to be. 
3.2 In the local context, the Local Outcomes Improvement Plan and Corporate
Plan, which set priorities for the Council and its partners, identifies the
importance of delivering new affordable homes to meet those priorities. The
Council’s Local Housing Strategy (LHS), which was approved at the Housing
& Social Wellbeing Committee on 15th March 2023, sets out the vision and
priorities for housing in Perth and Kinross, some of which, the SHIP seeks to
deliver on. 
3.3 The SHIP sets out the investment priorities for affordable housing over a 5-
year period and how the strategic vision set out within the Local Housing
Strategy (LHS) that ‘everyone in Perth and Kinross has access to the right
home, in the right place, at the right cost’ will be achieved. The LHS sets out
an annual target of 210 new affordable homes to be delivered in Perth and
Kinross. 
3.4 In the first four years of the LHS, 220 affordable homes were delivered in
2022/23, 173 in 2023/24, 264 in 2024/25, and 239 in 2025/26. The projection
for 2026/27 is 252 affordable homes will be delivered, which will mean an
average yearly delivery of 230 during the lifetime of the LHS, against a target
of 210. 
3.5 The SHIP sits alongside the LHS as one of its core delivery mechanisms. It
has been developed through engagement with tenants and community
members, relevant Council Services, the Health and Social Care Partnership,
developers and the following Registered Social Landlords (RSLs): 
• Hillcrest Housing Association
• Kingdom Housing Association
• Caledonia Housing Association
• Ark Housing Association 
Page 72 of 140

Page 73

3.6 Perth and Kinross tenants had an opportunity to review this report, via the
Tenants Committee Report Panel, which met on 17 September 2026. They
say: 
“The Tenant Committee Report Panel has considered the Strategic Housing
Investment Plan report and find it to be up to the usual high standard we
expect” 
3.7 The Council prepares the SHIP annually in its role as Strategic Housing
Authority. It ensures that the Council, and its partners, deliver housing that
meets the needs of the community, reflecting and aligning with outcomes and
housing policies, as set out in our LHS. 
3.8 Affordable housing within the SHIP includes new build projects, remodelling,
and conversion projects, off the shelf acquisitions and buybacks which are
delivered in following tenure types to meet local needs: 
• Social Rent
• Mid-Market Rent
• Shared Equity 
3.9 The Scottish Government will use this information to draft a Strategic Local
Programme (SLP) Agreement which, once agreed, will form the basis of the
Council and our Partner Programme Agreements. 
3.10 Each year the Scottish Government provide a Resource Planning Assumption
(RPA), which is the funding allocated to help deliver affordable housing in
each council area. The funding for Perth and Kinross for 2026/27 is
£16,998,000. The Scottish Government have changed from giving one year
funding allocations to multi-year RPAs. This is a positive step and provides
much greater certainty to manage the programme. The RPA for each of the
years within this SHIP, are as follows: 
Financial Year RPA
2027/28  £17,508,000
2028/29  £18,033,000
2029/30  £18,574,000
2030/31  Not announced yet
2031/32 Not announced yet 
3.11 All projects identified as priorities for funding over the 5-year period are
identified within Appendix 2 of the ‘Strategic Housing Investment Plan
2027/28 - 2031/32’ report. These projects have been recorded on the Scottish
Government’s Housing and Regeneration Programme (HARP) system. 
Page 73 of 140

Page 74

4. Proposals 
4.1 The SHIP 2027/28 – 2031/32 is set out in Appendix 1, with the selected
projects contained in Appendix 2 of that report and a notional grant allocation
listed against each project to demonstrate the funding required. The grant
allocations are based on estimates using benchmark figures. The table in
appendix 2 off the ‘Strategic Housing Investment Plan 2027/28 - 2031/32’
report does not include any sites that have no funding during the SHIP years
and so projects currently onsite, or due to go onsite this year with no grant
funding allocated in 2027/28 or beyond, are not included in that table. 
4.2  The construction sector can be challenging and often sites do not start when it
is hoped or anticipated that they will. This places at risk our ability to spend
the grant that the Scottish Government offer through the RPA and if we do not
spend our full allocation within the financial year, we cannot carry this onto
next year, and this would be re-allocated elsewhere. To ensure that we spend
the full grant monies available, the SHIP 2027/28 – 2031/32 has been over-
programmed by 30% to allow for any slippage. Scottish Government guidance
indicates that plans should be over provisioned by a minimum 25%. 
4.3  Appendix 1 in the ‘Strategic Housing Investment Plan 2027/28 – 2031/32’ sets
out in detail the anticipated starts and completions over the 5-year period. The
headline outputs are listed in the table below. 
Financial Year Starts (including
buybacks)
Completions (including
buybacks) 
26/27 276 223
SHIP Period 27/28 – 31/32
27/28 441 252
28/29 350 412
29/30 198 301
30/31 208 319
31/32 169 156
Total 1366 1440
Yearly Average 273 288 
4.4  Projecting yearly outputs can be challenging and subject to change, however
based on current projections the LHS target of delivering 210 new affordable
homes can be delivered through the SHIP period. However, it relies on PKC
ensuring that the full RPA is drawn down each financial year and continues to
support the community led housing projects that are set out in the ‘Strategic
Housing Investment Plan 2027/28 - 2031/32’. 
Page 74 of 140

Page 75

4.5  Once approved, the SHIP will be submitted to the Scottish Government
through the HARP system before the required date of 31st October 2026. 
4.6  The ‘Strategic Housing Investment Plan 2027/28 - 2031/32’ will be published
on the Perth and Kinross Council website so that the public can easily find it. 
5. Conclusion/Rationale for Recommendations made in Section 2 
5.1 The multi-year funding offer from the Scottish Government, which covers year
1-3 of this programme, now gives greater certainty, which will enable PKC to
coordinate the delivery of affordable housing more effectively. 
5.2  The ‘Strategic Housing Investment Plan 2027/28 - 2031/32’ outlines the
investment plan for affordable housing in Perth and Kinross for 2027/28 –
2031/32. 
5.3 As outlined in recommendation 2, it’s important that delegated powers are
approved to allow for changes in the housing market and sites not developing
as expected. 
6. Impact and Value Assessment 
6.1 Link to IVA 
7. Appendices 
7.1 Appendix 1 – Strategic Housing Investment Plan 2027/28 – 2031/32, including 
• SHIP Delivery Tables, 
• SHIP Grant Funding Tables, 
• Empty Homes Returns, 
• Prioritisation Framework 
Page 75 of 140

Page 76

Page 76 of 140

Page 77

Appendix 1
Perth and Kinross Council 
Strategic Housing Investment Plan
2027/28 – 2031/32
“Everyone in Perth and Kinross has access to the right home, in
the right place and at the right cost” 
7
Page 77 of 140

Page 78

Contents 
1. Introduction
2. Strategic Context
3. Housing Need and Demand 
4. Available Resources
4.1 Affordable Housing Supply Programme
4.2 Housing Revenue Account (HRA)
4.3 Developer Contributions
4.4 Council Tax Reserve Income from the Reduction of Discount for Empty and
Second Homes
4.5 Housing Infrastructure Fund (HIF)
4.6 Vacant and Derelict Land Investment Programme (VDLIP)
4.7 Rural Housing Fund
4.8 Affordable Rural Homes for Key Workers Fund
5. Affordable Housing Delivery
6. Connection with other LHS priorities
6.1 Empty Homes
6.2 Gypsy Travellers
6.3 Child Poverty
6.4 Rapid Rehousing Transition Plan (RRTP)
6.5 Accessible Homes / Supported Housing
6.6 Rural / Community Led Housing 
6.7 City / Town Centre Living
6.8 Energy Efficiency
6.9 Mid-Market Rent / Low-Cost Home Ownership
7. Partnership Working, Consultation and Monitoring
8. Affordable Housing Policy
9. Prioritisation Framework
10. Development Constraints
11. Procurement Approaches
12. Equalities
13. Strategic Environment Assessment 
Appendix 1 – SHIP Delivery Tables 
Appendix 2 – SHIP Grant Tables 
Appendix 3 – Empty Homes Returns 
Appendix 4 – Prioritisation Framework 
Page 78 of 140

Page 79

1. Introduction
The Strategic Housing Investment Plan (SHIP) 2027/28 -2031/32 outlines investment
priorities for new supply affordable housing over five years, aligning with the outcomes set
out in the Local Housing Strategy (LHS) 2022-2027. 
The SHIP is designed to be a working tool which:
• Improves long-term strategic planning.
• Details how investment in affordable housing will be directed.
• Sets out key investment priorities for affordable housing and demonstrate
how these will be delivered and then resourced. 
• Forms the basis for detailed programme planning.
• Focuses on partnership working.
• Informs Registered Social Landlord (RSL) development funding plans.
• Allocates resources from a national to a local authority level.
• Reinforces the local authority’s role as the strategic housing authority.
The Council and its partners are committed to overseeing a programme of new affordable
housing that will contribute to the Scottish Government’s Housing to 2040 ambitions for
new affordable homes. To support this, the Scottish Government have confirmed the
Resource Planning Assumption (RPA) for Perth and Kinross:
Year Resource Planning Assumption
2026/27 £16,998,000
2027/28 £17,508,000
2028/29 £18,033,000
2029/30 £18,574,000
2030/31 Not announced yet
2031/32 Not announced yet 
All projects identified as a priority for funding over this 5-year period are set out in appendix
3 and are recorded in the Scottish Government’s Housing and Regeneration Programme
(HARP) system. Whilst these projects are included within the SHIP as a priority, this does not
guarantee their delivery as each site will be subject to planning and have to satisfy the
requirements of a planning application and viability tests. 
Projects included within the SHIP will be delivered through new build, buybacks,
conversions, and remodelling. The Scottish Government will use this information to draft a
Strategic Local Programme Agreement (SLPA). 
2. Strategic Context 
Housing to 2040 sets out the Scottish Government’s vision that everyone in Scotland should
have access to a warm, safe, affordable and energy efficient home that meets their needs in
a community they feel part of and proud of. The strategy is based on the principles of social
Page 79 of 140

Page 80

justice, equality and human rights and includes a target to deliver 110,000 affordable homes
in the 10 years up to 2031/32, with 70% of these for social rent.
The Perth and Kinross Local Housing Strategy (LHS) 2022-27 has been informed by the
themes and aims set out in Housing to 2040 and aims to deliver on the vision that “Everyone
in Perth and Kinross has access to the right home, in the right place, and at the right cost”. 
The four main priorities set out in the Perth and Kinross LHS 2022-27 that this plan helps to
support are: 
• LHS Priority 1: Providing more affordable homes to support liveable and sustainable
communities. 
• LHS Priority 2: Providing a range of housing options that people can easily access,
afford, and keep. 
• LHS Priority 3: Delivering housing for people with varying needs. 
• LHS Priority 4: Delivering quality homes with affordable warmth, zero emissions, and
SMART technology.
In addition to ‘Housing to 2040’ vision, the SHIP considers the Scottish Government’s
Housing and Planning Delivery Framework (HPDF).  This framework promotes better
collaboration between Housing and Planning Services, focusing on the Local Housing
Strategy, Housing Need and Demand Assessment and Scottish Planning Policy.
The National Planning Framework 4 (NPF4) sets national planning policies and a
development plan for Scotland. Along with other key local documents like the Local
Development Plan (LDP) and the Housing Land Audit (HLA), NPF4 has guided the investment
decisions in the SHIP and ensures a steady supply of future projects.  
The SHIP also aligns with the aims of the Perth and Kinross Integration Joint Board Strategic
Plan 2024-2027. The Housing Contribution Statement, which acts as the bridge between the
LHS and the Strategic Plan, reflects how housing contributes to the Strategic Plan priorities,
emphasising the importance of providing suitable housing and support to help people live
independently. 
This includes:
• Working with housing developers to build sustainable housing which can be easily
adapted to meet changing household needs. 
• Continuing to work in partnership with a range of services to meet the housing
requirements of people with particular needs.  
• Providing a range of housing options for older people, including sheltered housing
with on-site housing support. 
• Intervening early to prevent and respond to homelessness effectively.  
• Ensuring suitable housing and housing support is available to prevent admissions and
prolonged stays in hospital and engage early with partners to deliver a seamless
service for people discharged from hospital. 
Page 80 of 140

Page 81

• Ensuring residents and tenants have access to services which allow their current
home to be adapted to meet their medical and support needs.  
• Supporting residents to live in warm, dry, energy efficient and low carbon homes
which they can afford to heat. 
3. Housing Need and Demand 
The Perth and Kinross Housing Need and Demand Assessment (HNDA) was conducted in
2021 across Tayside, including Angus, Dundee, Perth and Kinross and Northern Fife. A report
based on the HNDA was presented to the ‘Housing and Social Wellbeing Committee’ in
March 2023, outlining the Housing Supply Targets. 
The Housing Supply Target is incorporated into the LHS as an annual target over five years.
This determines the scale and type of affordable housing required to meet housing need and
demand throughout the LHS period. 
The LHS has set a target of 210 new supply affordable homes per year. This is across a range
of delivery types including new build, buybacks, conversions, remodelling and empty homes,
by both council and RSL partners with a mix of social rent and other tenure, e.g. shared
equity, mid-market rent (MMR). 
For development planning purposes, the Perth and Kinross housing market is divided into
five Housing Market Areas (HMAs). These are:
• Greater Perth
• Highland
• Kinross
• Strathearn
• Strathmore & The Glens
There are no specific housing supply targets for these HMAs.
Work has commenced on a refreshed HNDA to inform the next LDP and LHS, and although it
is too early to convey outputs within this SHIP, the following actions have been completed so
far
• Established a Housing Market Partnership (HMP) to provide the necessary
stakeholder engagement forum.
• An external company, Arneill Johnson, has been procured to confirm, via market
research, that the existing Housing Market Areas (HMA’s) are satisfactory and do not
need to change. This has been approved by the HMP
• A survey has been conducted to identify the necessary data to consider the need and
demand of the community, and local business. 
• Housing Market Drivers that inform the HNDA calculation have been identified
4. Available Resources
4.1 Affordable Housing Supply Programme (AHSP)
Page 81 of 140

Page 82

The Affordable Housing Supply Programme is part of the Scottish Government’s More
Homes Scotland approach.  It aims to increase affordable homes across all tenures and meet
the objectives set out in ‘Housing to 2040’. This Programme supports the Council in
delivering its affordable housing priorities.  The SHIP priorities inform the Strategic Local
Programme Agreements (SLPA’s). The SLPA is a 3-year programme, containing SHIP projects,
with year one being the finalised list of projects with approval to make applications for
funding from the Scottish Government. There are published grant benchmark rates for these
applications with figures varying depending on location, tenure, applicant, and provision of
additional quality standards. 
To support the delivery of affordable homes, local authorities are provided with Resource
Planning Assumptions (RPAs) by the Scottish Government. RPAs are the yearly grant
allocation that helps finalise the programme and act as a guide for planning over the 5-year
period of the SHIP. The funding allocation for Perth and Kinross is noted in Section 1 above.
The multiyear funding announcement is welcome, as this provides more certainty, than was
the case previously when only one year RPA’s were made available. 
The Scottish Government guidance is that minimum 25% over provision should be built into
the programme. This SHIP has been over provisioned by 30% to ensure our full grant
allocation is met and account for any slippage that is, naturally, likely to occur. The level of
over provision has been deemed appropriate, based on recent delivery outputs, and the
level of slippage seen previously. The SHIP has been front loaded with space in later years
should projects slip and a notional grant allocation has been attributed to each project at
benchmark levels to demonstrate that the programme is planned effectively.  Running
parallel to the SHIP is a programme of ‘pipeline’ projects, this both ensures a good supply of
projects to come into future SHIP’s as well as reflecting a focus on projects that are
deliverable. 
Whilst this SHIP contains predominantly new build projects, the Council has increased its
target to deliver buybacks from 40 to 50 per year and encourages partner RSLs to identify
opportunities to do this also, where it meets their strategic needs. Buybacks not only
increase the supply of good quality affordable housing in areas of need but can also reduce
maintenance costs by targeting those properties that bring majority or full ownership of a
block back. These properties are typically 1, 2, or 3 bed properties and can meet the housing
needs of a variety of households, including those with a medical need. 
Whilst the target had been set at 40 per year, purchases in years 24/25 and 25/26 have been
over and above this number.  So, whilst the target has been increased to 50 per year in this
SHIP, consideration will be given as to whether a larger number can be purchased per year,
should finances allow. However, buybacks are dependent on what becomes available, which
is out of the control of the Council as it is an individual’s decision whether to sell or not. 
The Council, in consultation with the Scottish Government, will continue to manage the
AHSP in conjunction with its Housing Capital Plan, Housing Revenue Account investment,
Council Tax 2nd Homes Funds, and Commuted Sums to maximise the delivery of affordable
housing in priority areas during the SHIP period.
Page 82 of 140

Page 83

4.2 Housing Revenue Account (HRA) 
Prudential borrowing via the HRA is a key funding component used in addition to Scottish
Government housing subsidy to support the delivery of Council affordable homes. The
financial viability of all potential Council projects is assessed in terms of the Housing
Revenue Account 30-year business plan.  This ensures that the capital costs generate a
reasonable return on investment over the long term. The new build programme is
monitored as part of the HRA capital monitoring process between Finance, Housing, and
Property. The Council has a new build programme target of 80 new build affordable homes
per annum during the 5-year period of this SHIP.
4.3 Developer Contributions 
There are a range of different types of developer contributions on new housing sites
however the criteria for Affordable Housing obligations, including commuted sum payments,
are set out in PKCs Developer Contribution and Affordable Housing Supplementary
Guidance.  
There is currently around £1million available from Developer Contributions to support the
delivery of affordable housing initiatives throughout Perth and Kinross. These funds can be
used to augment grant funded projects to become viable and, where appropriate, can be
considered as a complement to Scottish Government housing subsidy. The developer
contributions need to be spent within that housing market area in which they were raised. 
Applications for Developer Contributions can be made to PKC Housing Strategy to support
the delivery of affordable homes. However, PKC take a sequential approach to the
implementation of the affordable housing contributions with onsite provision being
preferred, and so the expectation is that commuted sum income will reduce.
In the financial year 2025/26, PKC Housing Services drew down £320,000 as a contribution
to redevelopment of the former Beechgrove Care Home site and contributed £60,000
towards PKCs Buyback initiative.  In addition, some smaller awards were made towards
feasibility studies and rural housing initiatives. 
4.4 Council Tax Reserve Income from the Reduction of Discount for Empty and Second
Homes 
The Council has funding available through income raised each financial year from Council Tax
(Empty Homes and 2nd Homes). This funding assists in supporting the provision of all
affordable homes delivered by the Council (new build and Empty Homes) and new builds for
RSLs. 
As of 1 April 2026, the balance of funds remaining from Council Tax for the delivery of
affordable housing was £6.2m. Since 2015/16 through the delivery of new build affordable
housing and Empty Homes, the Council has used funding of over £12m from the Council Tax
to assist with the delivery of affordable homes. For new supply affordable homes, these
funds, as well as developer contributions, are used on a case-by-case basis depending on the
nature and funding position of the project.
Page 83 of 140

Page 84

These funds have supported a number of affordable housing projects and a commitment has
been made to continue to support delivery of affordable housing through this SHIP.  
The table below lists the projects that have been, or will be, supported with a financial
contribution via this fund. 
Previous Delivery 
Site  Total New Homes Organisation  Year 
Lynedoch Road, Methven  17 PKC 24/25
Kinross Off the Shelf 6 PKC 24/25
Dunkeld NTS 20 PKC 24/25
Glenalmond Road, Rattray 18 PKC 25/26
Broich Road, Crieff Off the Shelf  12 PKC 25/26
Westpark, Blairgowrie Off the
Shelf
4 PKC 25/26
Westpark OTS  3 PKC 26/27
Future Delivery 
Fishers Way, Aberfeldy  3 Aberfeldy
Development Trust
26/27
East of St Cedds Road,
Ballinluig
35 PKC 27/28
Castlemains, Auchterarder 12 PKC 27/28
Westfields, Rattray 54 PKC 27/28
Balhousie Perth 47 PKC 27/28
Beechgrove, Perth  33 PKC 28/29
Moncreiffe Care Home, Bridge
of Earn
42 PKC 28/29
Borlich, Aberfeldy 35 PKC 29/30
Scone North 37 PKC 29/30
Duntaylor Avenue, Aberfeldy 52 PKC 29/30 
Beyond supporting specific affordable housing projects, and the operation of PKC’s Empty
Homes service, the funds also cover some staffing costs within Housing Strategy, as well as
contributions to Council Tax and Missing Shares posts.
4.5 Housing Infrastructure Fund (HIF)
The HIF funds stalled housing developments due to the excessive cost or nature of the
infrastructure works required.  PKC considers suitable sites on an ongoing basis and has had
some dialogue with the Scottish Government over a potential application, however it’s not
clear currently whether any sites within the SHIP meets the criteria that the Scottish
Government set out. Nevertheless, PKC will continue dialogue with the Scottish Government
and should a suitable site be identified, ensure that an application to HIF is submitted.  The
HIF, and the other funds noted below, sit separate from the main programme and are not
taken from the RPA, and so are additional funds available to help the programme. 
4.6 Vacant and Derelict Land Investment Programme (VDLIP)
Page 84 of 140

Page 85

The Vacant and Derelict Land Investment Programme (VDLIP) offers funding to transform
long-term vacant and derelict sites. There are no projects in this SHIP being funded by VDLIP,
largely due to the lack of sites that fall into this category within Perth and Kinross. However
regeneration is a key component of this SHIP and aligns with Housing to 2040’s ‘brownfield
first’ approach. Over the course of this SHIP, we project that 457 new affordable homes can
be delivered on brownfield sites, which is 35% of new build delivery over this 5-year plan.
There will be 72 new affordable homes delivered on sites that are on the Vacant and Derelict
Land Register. 
PKC have adopted a policy whereby priority is given to affordable housing as an end use,
when disposing of its surplus land or buildings. This reflects the ambition to enhance the
provision of affordable housing on brownfield sites and move towards achieving the LHS
ambition to deliver 50% of affordable homes on brownfield sites. 
There are no housing sites with VDLIP funding attached to them. 
4.7 Rural & Islands Housing Fund (RIHF)
PKCs Housing Strategy Team, alongside rural specialists Communities Housing Trust, is
actively working with seven Community Development Trusts to support Community-Led
affordable housing and deliver new affordable homes in rural Perth & Kinross. 
Since 2022, PKC has undertaken a Housing Needs Assessment Programme (HNAP), delivered
by CHT.  To date, Housing Needs Assessments have been carried out in seven settlements
across Perth & Kinross, these are:
• Dunkeld and Birnam
• Pitlochry
• Mount Blair
• Aberfeldy
• Comrie 
• Kinloch Rannoch 
• Blair Atholl
Current live projects supported by RIHF include:
• 2 refurbished flats at Aberfeldy Town Hall, due to complete September 2026
• 3 newbuild flats to be purchased ‘off-the-shelf' in Aberfeldy, due to settle in
September 2026 
• 8 new affordable homes in Aberfeldy, application for planning permission was lodged
May 2026
• 12 new affordable homes in Kinloch Rannoch, application for detailed planning
permission was lodged July 2026
• Pre-application lodged April 2026 by Comrie Development Trust for 4 new affordable
homes 
• 10-15 new Community-Led affordable homes in Aberfeldy to be delivered as part of a
larger PKC-led project
Page 85 of 140

Page 86

• Dunkeld & Birnam Community Development Trust undertaking feasibility for up to 12
new affordable homes in Birnam
In addition, PKC’s Housing Strategy and Communities Housing Trust are exploring candidate
sites with Pitlochry Community Action Trust, and are also supporting Blair Atholl & Struan
Community Council to establish a Community Development Trust or Scottish Charitable
Incorporated Organisation (SCIO) to deliver new affordable homes
Typically, RIHF funds are secured alongside other funding such as Scottish Land Fund,
charitable trusts and Housing Subsidy.  Community-Led housing helps address a lack of
affordable homes in rural areas and aligns with the Scottish Government’s Rural & Islands
Action Plan (2023).  Typically, there are fewer housing sites brought forward in these
locations, and small rural communities can have varying types of housing need that is often
better addressed by enabling those that live and work in these communities, to deliver new,
affordable homes. 
4.8 Affordable Rural Homes for Key Workers Fund
Up to £25 million across Scotland is being made available from the Affordable Housing
Supply Programme budget over 2023 to 2028 for the Rural Key Workers Housing Fund. The
funding enables local authorities and RSLs to purchase existing suitable properties in rural
areas which can be rented directly or leased to employers to provide affordable homes for
key workers. Opportunities to utilise this fund on bulk purchases are being explored to
ensure that key workers can be housed in the areas of identified need.  
The updated common allocations policy in Perth and Kinross includes ‘people unable to take
up a key worker job offer due to affordable housing not being available’, as a strategic need
category, that provides the applicant with a high priority for re-housing. This enables access
to social rented sector for key workers requiring affordable housing, where this is deemed
necessary. 
A survey was undertaken via Health and Social Care Partnership to identify areas of key
worker need within the care sector and enhance the evidence base that has been accrued
via the Housing Needs Assessments done in some of our rural locations. More recently, work
has begun on a refreshed Housing Need and Demand Assessment (HNDA) which will be able
to highlight need for Mid-Market Rent housing that could be targeted at key workers. An
extensive survey was carried out as part of this work.  Consideration will also be given to
Local Lettings Initiatives in locations where new supported housing developments are being
built to ensure suitable staff resource. PKC will work with partners delivering Mid-Market
Rent also to ensure that new supply can be targeted towards key workers in areas of
identified need. This will be done by coordinating both with the Council’s Housing Options
Service and the Health and Social Care Partnership. 
5. Affordable Housing Delivery 
The programme, outlined in appendix 3, is based on operating at 130% of the current RPA.
This approach is taken to effectively manage slippage and the outputs listed in the table
below should be considered on that basis. 
Page 86 of 140

Page 87

The table in appendix 2 contains expected delivery data for the 5-year period, and below is
the headline data from that table. 
Financial Year Starts (including buybacks) Completions (including
buybacks) 
26/27 276 223
SHIP Period 27/28 – 31/32
27/28 441 252
28/29 350 412
29/30 198 301
30/31 208 319
31/32 169 156
Total 1366 1440
Yearly Average 273 288 
Projecting yearly outputs can be challenging and will be subject to change, however based
on current projections the LHS target of delivering 210 new affordable homes can be
delivered through this SHIP period if the funding levels remain as projected. However, it
relies on PKC ensuring that the full RPA is drawn down each financial year and continues to
support the community led housing projects that are set out below. The programme is
designed so that should monies become available over and above our RPA, then we are able
to claim that and bolster our outputs. 
6. Connection with other LHS priorities
6.1 Empty Homes
Having empty homes as an integral part of affordable housing provision ensures a
coordinated approach within Perth and Kinross. The Council’s aim is to bring 135 privately
owned empty properties back into use each year. The Vacant Property Team and the Private
Sector Housing Team work collaboratively to deliver an Empty Homes Service that provides
advice and assistance to owners of long-term empty properties and work towards set
targets. The Empty Homes Service covers both residential and non-residential properties to
provide a holistic approach to solving the problems caused by empty buildings. The Private
Sector Housing Team works in tandem with the Housing Options Team to ensure empty
homes are targeted in appropriate areas and to those in housing need. 
Our Empty Homes Initiative grants, administered by our Private Sector Housing Team, enable
owners to upgrade or repair their properties in return for the properties being let out at
Local Housing Allowance rates for a 5-year period, which both returns an empty property to
use and increases the supply of affordable housing. 
These properties are let through the Rent Bond Guarantee Scheme which aims to help
people access housing opportunities in the private rented sector. In 2025/26, 11 Empty
Homes Initiative grants were issued to owners to repair or renovate their properties with a
view to them being let out at Local Housing Allowance levels.  Furthermore, through Vacant
Page 87 of 140

Page 88

Property Feasibility Grants, funding of professional fees for owners allows them to
undertake feasibility studies to enable repairing or re-purposing of their empty properties. 
The Scottish Government guidance on the SHIP content, specifies that we should set out an
overview of the numbers of empty homes brought back into use, with the assistance of the
Council, over the last three financial years. However, this is already reported yearly to Empty
Homes Partnership, operated by Shelter Scotland on behalf of the Scottish Government.
Though to adhere to the Scottish Government Guidance, this information is listed in
appendix 4. Whilst these figures reflect the recorded empty homes being returned with
assistance by PKC, they do not show the long-term trends in empty homes. In 2014 the
percentage of dwellings in Perth and Kinross that were long term empty homes was 2.3%,
compared to a national figure of 1.3%, whereas by 2024 this was 2% in Perth and Kinross,
and 1.6% nationally. There will naturally be year on year fluctuation, however the general
trend of long-term empty homes shows a declining percentage of dwellings in Perth and
Kinross being long term empty dwellings compared to an increase nationally, and this is
resulting in greater alignment between Perth and Kinross and Scotland. 
6.2 Gypsy Travellers
Gypsy Travellers have travelled through Perth and Kinross for centuries and many have in
more recent times settled within the community as residents. Perth and Kinross Council
have a ‘Perth and Kinross Gypsy/Traveller Action Plan – 2023-27’, that establishes a range of
outcomes it hopes to achieve, to enable the community to flourish. 
There are two permanent sites operated by PKC, Double Dykes and Bobbin Mill, providing 26
units of chalet-style accommodation. The two PKC sites were transferred into the HRA in
2022, which will enable planned maintenance and Capital improvements programmes to
ensure Scottish Housing Regulator standards are maintained. There are no temporary or
short stay pitches on these sites and occupancy levels at these sites are typically 100%.
There are also 24 pitches across 3 private sites. 
A major capital project at the Double Dykes site to replace the 20 chalets with high-quality,
energy efficient accommodation has been completed. This transformative project has not
only upgraded the accommodation itself but also the services, boundaries, pathways,
drainage and amenity space. PKC secured nearly £4m in funding from Scottish Government’s
Gypsy/Traveller Accommodation Fund, with the remaining cost being covered by the
Housing Revenue Account (HRA).  The development was done in 3 phases to minimise
disruption to residents.
A feasibility study has also commenced to look at options for improving Gypsy Traveller
provision at Bobbin Mill. This is at the early stages, with two engagement sessions held with
the community from Bobbin Mill. The feedback from the second engagement session has
been reviewed, and further individual meetings have commenced with residents to discuss
their feedback and ensure their requirements have been clearly outlined. Based on
discussions from the second engagement session, residents were also provided with the
opportunity to visit a chalet that has been installed on a site in Fife. 
Page 88 of 140

Page 89

The Local Housing Strategy 2022-2027 established a need to ‘Work with Gypsy/Traveller
community members to have a better understanding of their accommodation needs and
preferences and explore and develop workable solutions’.  This work will continue as part of
the emerging Local Development Plan (LDP3) and will involve representatives from Planning
and Housing establishing need to ensure that the supply of suitable sites is identified. A
specific piece of work to identify housing need and demand of the gypsy traveller
community to inform the next LDP and LHS is underway, sitting alongside the new Housing
Need and Demand Assessment (HNDA). 
It was however already established that a site was required for transient travellers, and so
PKC undertook a site assessment appraisal via the Urban Capacity and Brownfield study, to
consider the available options. Plans were then developed for the preferred site in
consultation with the gypsy traveller community, and a planning application was recently
submitted, and approved at committee.
6.3 Child Poverty 
The Council’s Child Poverty Action Report prioritises new affordable housing in areas with
high child poverty. This helps those in need access quality homes and improves life chances.
In 2025/26 there were 8 new build properties delivered in the Scottish Index of Multiple
Deprivation (SIMD) lowest quintile (lowest 20%), reflecting 7% of new build delivery. Over
this 5-year SHIP, there is projected to be 32 new build properties funded in SIMD lowest
quintile (lowest 20%), which equates to 2% of new builds being given grant assistance. 
However, Perth and Kinross Council have a Child Poverty Working Group that seeks to ensure
that there is a collaborative approach to reducing child poverty within our communities. Part
of this approach is identifying key areas of need within Perth and Kinross, and a recent
report, using a variety of local data sources, highlighted, by school catchment, those areas
most in need, or at risk of child poverty. During the lifetime of this SHIP, there is projected to
be 232 new build homes delivered in the top 5 school catchment areas that are most at risk
of facing child poverty.
As the Child Poverty Action Plan 2023/24 highlights, the SIMD identifies deprived areas, not
people, and this can be problematic for Perth and Kinross due to having substantial rural
areas where poverty is dispersed. A focus on rural areas where housing costs are high is also
important to alleviate pockets of child poverty, as well as those within the six recognised
priority groups at greatest risk of poverty. These are, minority ethnic families, lone parent
families, families with a disabled person, families with three or more children, families with
children under 1, and families with mothers aged 25 or under. The delivery of adapted
housing is set out below, though in 2025/26, 42 of the new build properties were delivered
with 3+ bedrooms, making them suitable for larger families, this equated to 38% of new
build delivery. Projections for this SHIP are that 337 new build properties will be delivered
suitable for larger families, which is 38% of this plan. It should be noted, that as this is a 5-
year plan, so some projects are further progressed than others and some do not have a
finalised design. This means that the figures used are based on current plans / estimates and
subject to change. 
Page 89 of 140

Page 90

Using Common Housing Register waiting list information can be difficult to address need as
applicants choose several areas for rehousing, however this data can help negotiate the
housing mix for new sites to ensure larger family homes are provided where needed.
Achieving a reduction in child poverty is a clear aim of the Local Housing Strategy, and
Strategic Housing Investment Plan. Affordable housing enables more households to have the
opportunity to reduce their housing costs and free up more of their income on other
essentials for their children. 
Beyond the provision of new supply affordable housing contained in this SHIP, there has
been a variety of measures, supported by PKC, to alleviate child poverty, these include: 
• The Tenancy Sustainment Fund providing 591 households with a financial payment
toward their rent arrears balance, from a total budget of £220K.
• The Financial Inclusion Project, delivered via CAB, supporting a total of 547 families
with a financial gain of £672,778k for those referred.
• Our Think Yes budget supporting a total of 181 households, with a spend of £28,175.
This £30k fund is used by Locality Housing Teams to help meet the costs of moving
into a new home. The fund in 2026-2027 has been increased to £60K, due to the
ongoing need for assistance.
• Supporting 62 households in the Private Rented Sector to sustain their tenancies
through the Private Sector Sustainment Fund with a spend of £68,286K.
• The Scarf energy advice service was focused on low EPC rated homes and facilitated
applications to the ECO4 scheme. A total of 1,331 residents were engaged through
letters, calls, and community events with the total financial cost of the installed
measures estimated to be around £1,256,376.
• The SCARF Home Energy Advice Team project, funded by Housing & Communities,
providing energy advice services to a total of 519 households through Home Visits
and remote Home Visits. The advice resulted in £168.00 of energy debt being written
off and £47,277 of Fuel Bill discounts being received from the Energy Redress Fund. 
6.4 Rapid Rehousing Transition Plan (RRTP)
Adopted in April 2019, the PKC’s Rapid Rehousing Transition Plan (RRTP) aimed to prevent
homelessness and minimise its impact.  It supported the Local Housing Strategy, was an
integral part of the Strategic Housing Investment Plan (SHIP) and influenced the delivery of
the Health and Social Care Partnership’s Strategic Plan. 
The main objectives within the RRTP were to deliver a service which is focussed on
preventing homelessness and minimising the impact of homelessness where it cannot be
avoided.  
This was to be achieved by continuing to: 
• intervene early and prevent homelessness through enhanced advice, assistance and
support.
Page 90 of 140

Page 91

• offer and provide a route for homeless people to move directly to settled
accommodation.
• reduce the need for temporary accommodation and minimise the length of time
people spend in temporary accommodation where it cannot be avoided.
Throughout the period of the RRTP Perth & Kinross has achieved many of the rapid
rehousing objectives, significantly reducing the number of households in temporary
accommodation, the length of wait to be offered settled accommodation, and reducing the
use of unsuitable accommodation to stays of no more than 6 nights, where it is unavoidable. 
Perth & Kinross continues to be sector leading in the majority of homeless indicators.
However, a transition to rapid rehousing is no longer a realistic ambition for most local
authorities even with the Scottish Government’s reaffirmation of its commitment to ‘Ending
Homelessness Together’. The Scottish Government confirmed that they will no longer
require Local Authorities to update and submit revised RRTP’s. 
It is anticipated that the Scottish Government will shift towards the new Prevention Duty
within the Housing (Scotland) Act 2025 which places responsibility on “relevant bodies” to
ask and act in relation to homelessness. The key changes are that it places responsibility
around homelessness on more than just local authority homeless / housing services, and the
definition of someone who is threatened with homelessness will be extended from 2
months to 6 months, with the aim of increasing the time available to intervene. The
legislation requires “Ask and Act” to be implemented no more than 3 years after Royal
Assent which will be November 2028. 
PKC has committed to developing a Homelessness Strategy or Statement as an appendix to
the next LHS which is due to be published in May 2028.
Increasing the supply of suitable affordable housing will assist in meeting the strategic aims
of prevention of homelessness. It will also support the commitment to ensuring that those
in housing need find the fastest route to safe and secure accommodation and help them
resettle in their new homes quickly and successfully with support. Strong partnership
working with Housing will ensure that new housing through the SHIP reflects the required
needs of people facing homelessness.
6.5 Accessible Homes / Supported Housing 
A Review of Housing for Older People began in November to plan for the housing and
support needs of the ageing population. As part of this, a multiagency working group was
formed which includes key PKC, Health and Social Care Partnerships (HSCP) and NHS leads.
The Review will consider and be informed by:
• Current and future demand needs analysis (Waiting Lists and Housing Need and
Demand Assessment).
• Current access into provision and opportunities for redevelopment
• Provision of support and technology.
• Communication & engagement with current tenants and wider population.
Page 91 of 140

Page 92

In 2019 the Scottish Government published ‘Guidance for setting of Local Housing Strategy
(LHS) targets to support the delivery of more Wheelchair Accessible housing’. Following on
from this, the PKC LHS 22-27 set out a target that 10% of new build affordable homes to be
wheelchair accessible or adaptable standard.   
In 2025/26, 9 fully wheelchair adapted properties were delivered via the SHIP with 10
adapted properties suitable for older / ambulant disabled households, which was 22% of
new build delivery for the year. PKC will continue to work with developers and partner RSLs
at an early stage in developments to achieve this target and enhance the provision of
adapted properties in the locations that they are most needed. Over the course of the 5-year
SHIP, 139 wheelchair adapted properties will be funded, which equates to 11% of new build
delivery. 
Achieving a target such as this can be challenging as many developments not achieving the
10% will already be in the SHIP at a progressed stage. Where this is the case, and where
appropriate, an amendment to planning, or new application will be made to ensure this
target is met. Off the shelf opportunities often do not come with the required contribution
and so consideration needs to be given to, where possible, enhancing provision of those
sites with early involvement.
The current LHS 2022-27 plays a significant role in improving public health in Perth and
Kinross by setting the framework for delivering accessible homes, wheelchair homes and
particular models of provision such as supported accommodation for key groups. The LHS
also sets the framework for enabling people to live independently and well for as long as
possible through investment in property adaptations, technology, care, and support services.
The Council are also open to opportunities to invest in homes that are more attractive to
elderly across tenures. There continues to be a need to develop projects which have
adaptable features, community spaces and flexible support services, filling the gap between
mainstream homes and homes for varying need. This will be particularly important in
meeting the emerging needs of those in rural areas. 
The Council submitted a response to the Scottish Government Housing for Varying Needs
(HfVN) Proposed Guidance Consultation (extended to Dec 2023), and plan to adopt new
guidance subject to further revisions and publication in order to continue to meet the needs
of these groups. 
Perth and Kinross Council have recently established a Complex Housing Solutions Panel,
which is an interdepartmental body that comes together to review the households needing
some form of adapted housing with the aim of identifying a housing solution for each. The
solutions can include in situ solutions such as adaptation, conversion etc or new housing
solutions such as existing stock allocations, or new supply. The panel is made up of officers
that oversee Housing Options, OT, Housing Strategy, Housing Technical and Capital Projects,
and seeks to provide a proactive, and coordinated, response to those with complex needs. 
Page 92 of 140

Page 93

For those who have been assessed as having care and support needs to live independently in
the community, a home in the right place can be crucial. PKC’s Housing Strategy Team works
closely with the Independent Living Panel (ILP), which provides an integrated approach to
meeting housing, health and social care needs for those people who have been assessed as
requiring support to enable them to live in the community. 
To ensure that appropriate accommodation can be planned for, referrals made to the ILP
inform the programme of new build provision for this group including identifying suitable
locations and primarily through consideration of the ‘core and cluster’ model of supported
accommodation where a Support Provider is based in a property and provides 24/7 shared
support to several individuals clustered around this. 
In 2023/24 a supported housing project, part funded via the SHIP, was delivered at Bertha
Park, Perth by Kingdom Housing Association to meet independent living needs. Another SHIP
project in Crieff, built by Hillcrest Housing Association, completed in 25/26. This will provide
a further eight properties for individuals with support needs as well as 24/7 staff base. 
There are sites in the SHIP where supported housing opportunities are being explored in
collaboration with the OT and the respective developer, such as Duntaylor Avenue,
Aberfeldy. Furthermore, there is ongoing dialogue with the Independent Living Panel about
need and demand in areas where new build sites are planned, so that a steady supply of
new independent living resources can be delivered in suitable locations. 
6.6 Rural and Community Led Housing
PKC faces unique demographic challenges due to having a large rural population and a city
within its boundary. The LHS 22-27 sets out the aim that the Urban / Rural population split
(53%/47%) should be reflected in new affordable housing delivery. In 2025/26, 62% of new
affordable housing delivered through the SHIP was in urban areas, whereas 38% was in rural
locations, which is a slight variation from the previous year where the split matched exactly
the 53/47 split. This SHIP will fund 618 new affordable homes in urban areas with 676 in
rural locations, which equates to a 47% / 53%. Whilst these projections do not include
buybacks or new delivery supported via the Rural Housing Fund, the current projections are
that the SHIP will largely reflect the urban rural split set out in the LHS 22-27.
The SHIP is only one funding mechanism that can aid delivery of affordable housing. PKC’s
Housing Strategy Team works closely with communities to enable Community Led Housing
to be delivered through funding streams such as the ‘Rural and Islands Housing Fund (RIHF)’
and the ‘Scottish Land Fund’. These approaches not only allow greater community input into
the provision of affordable homes but also reduces reliance on the main programme grant. 
We have supported the completion of seven Housing Needs Assessments in rural areas to
identify the specific needs of these communities.  We are currently enabling seven local
communities to deliver community led housing. 
Project Partner Planning
Status
RIHF Status Capacity Proposed
Site Start
Tenure
Page 93 of 140

Page 94

Aberfeldy
Town Hall
Locus
Breadalbane
Trust
Fully
Consented
Feasibility
& Capital
Approved
2 July 25 SR 
Fishers Way,
Aberfeldy
Aberfeldy
Development
Trust
Fully
Consented
Funding in
place
3 OTS
Purchase
July 2026
MMR
Kinloch
Rannoch
Rannoch
Development
Trust
24/00308/IPL
approved
Application for
detailed
Planning
Consent
lodged July
2026
Feasibility
Costs
Approved
12 Spring
2027
Mixed
Corran Reil
site
Aberfeldy
Development
Trust
Planning
Application
lodged April
2026  
Feasibility
Costs
Approved
8 Spring
2027
Mixed
Ancaster
Road,
Comrie
Comrie
Development
Trust
Pre-
application
lodged April
2026
TBD 4 Summer
2027
SR 
Duntaylor
Ave,
Aberfeldy
Aberfeldy
Development
Trust
Developer-led,
PKC is lead
client
- 10-15 Sep-27 Mixed
Adjacent to
Torlee Road,
Dunkeld 
Dunkeld &
Birnam
Development
Trust
- Feasibility
Costs
Approved
10-12 TBC TBC
Blair Atholl
Railway
Station
Blair Atholl &
Struan CC
- Feasibility
fully
funded by
Scotrail &
RHT
3 TBC TBC
Killiecrankie
Rail Yards
Pitlochry
Community
Action Trust
- - 10 TBC Mixed 
The delivery of these projects though relies on the continued support of the Scottish
Government through the Rural and Islands Housing Fund. There have been some recent
applications made for feasibility works that have not been approved, which is constraining
the ability of local communities to move projects forward. 
6.7 City / Town Centre Living 
The LHS 22-27 identifies a target to deliver 53% new supply affordable housing in urban
areas and 47% in rural areas, as this reflects the population split of our communities. So,
whilst it is acknowledged that there is a substantial rural population, there is also a sizeable
urban population with a city and a number of large towns within our boundary. Many wish
Page 94 of 140

Page 95

to reside in town and city centre locations due to work opportunities, leisure activities,
access to services etc and so a focus on town centre living can boost the local economy and
community vibrancy. In this SHIP, we are projecting that 127 new affordable homes will be
funded that are situated in or very near city and town centre boundaries of the Perth and
Kinross, as defined in the Local Development Plan. 
6.8 Energy Efficiency
The Council seeks to maximise energy efficiency and reduce fuel poverty by meeting the
‘Greener’ energy efficiency standard in new builds, where practical. To meet this standard,
homes must meet Section 7 Silver Standard Aspect 1 & 2 of the 2011 Building Regulations in
relation to Carbon Dioxide emissions and energy for space heating, as a minimum. 
The standard may not be achievable in all projects, particularly where an existing building is
to be redeveloped or where homes form part of a larger development for market provision
or through the PKC Buyback scheme. 
The Council supports RSL partners to develop to ‘greener standard’ as a minimum and,
where possible, to provide enhanced levels as set out within the Scottish Government’s
Housing to 2040 vision. 
The Council has published a new Design Guide for Sustainable, Inclusive Homes – a Net Zero
Approach, which aims to achieve, where possible, gold standard in energy efficiency. It must
be acknowledged however that costs can be a barrier to this, and a balance between high
energy standards and ensuring a robust programme of new affordable homes is maintained. 
6.9 Mid-Market Rent / Low-Cost Home Ownership
The Local Housing Strategy sets out a target that 30% of affordable housing delivery should
be either MMR or Low-Cost Home Ownership. The proposed SHIP anticipates that over the
5-year period around 14% of the new build supply will be either Mid-Market Rent or Low-
Cost Home Ownership, however efforts will be made to maximise this. 
To aid the delivery of Mid-Market Rent, approval to establish a Limited Liability Partnership
(LLP) was given at Full Council, with the supplementary funding for the first tranche of 13
properties at Westfields, Rattray, which is now onsite.  PKC will continue to pursue
opportunities to enhance the stock of this LLP and deliver Mid-Market Rent in areas of need.
These properties will be managed by council staff via PKC Lets, an experienced tenancy and
property management service that operates from PKC and already provides this service to a
number of private landlords within the local authority area. 
7. Partnership Working, Consultation and Monitoring
This SHIP has been developed through collaboration with the Scottish Government, RSLs,
and other stakeholders such as Health and Social Care Partnership and tenants’ groups.  
Housing and Planning are also key partners for the development and ongoing delivery of the
SHIP.  
Page 95 of 140

Page 96

PKC continues to have 6 weekly updates with the RSL partners to discuss affordable projects
both current and future opportunities. These meetings bring an opportunity for partners to
discuss the wider programme and strategic issues including updates from the Scottish
Government, Scottish Water, the SHIP, and site prioritisation. Every 6 weeks, updates are
provided to the Scottish Government on areas relating to planning, public utilities and
slippage impacting current/future year funding. PKC also host an Affordable Housing Supply
Programme Stakeholder meeting, which consists of Housing Strategy, Planning, RSL partners,
and the Scottish Government. This involves the group discussing the current year
programme alongside a range of other topics affecting the delivery of affordable housing in
Perth and Kinross. This is scheduled three times throughout the year at key points. Regular
contact is maintained outwith these set meetings to ensure a well-functioning programme is
maintained. 
PKC has established an LHS Delivery Group to ensure delivery of outcomes set in the LHS.
This group feeds into the Strategic Affordable Housing Board, which provides oversight on
the delivery of Perth & Kinross’s Affordable Housing Supply Programme and ensures
implementation of new affordable housing objectives contained in LHS and wider national
strategies. The Board comprises senior managers and officers from Housing, Planning,
Property, and Finance alongside an RSL representative. 
In developing the SHIP 2027/28 – 2031/32, all RSLs were asked to submit project proposals
for any new sites. All proposals were assessed alongside Council projects using the SHIP
prioritisation Framework (see Appendix 4) and the programme was then approved by the
Strategic Affordable Housing Board.
As outlined above, the Perth and Kinross multi-agency Independent Living Panel (ILP)
provides key information to the SHIP to enable the provision of supported housing in the
most appropriate locations and in the correct form. The ILP meets monthly and is made up
of over 20 members working across Housing, Health and Social Care Partnership teams. The
Panel provides an integrated approach to meeting housing, health and social care needs of
people who have been assessed as requiring support to enable them to live as
independently as possible in their own home or within a specialist provision. The recently
established Complex Housing Solutions Panel will also directly feed into the delivery of the
affordable housing supply programme by providing an evidence base in which to enable
negotiations on individual sites to ensure a suitable supply of adapted housing. 
The Council has frequent meetings with developers to discuss development sites and how
their developments can contribute to LHS priorities through inclusion in the SHIP. PKC’s
planning department also host a Housebuilders Forum to offer developers a space to discuss
issues ongoing within the sector. PKC’s Housing Strategy Team meet once a month with
planning colleagues to review and discuss any issues related to the affordable housing
supply programme. 
The private sector plays a very important role in supporting the delivery of affordable homes
through affordable housing contributions on sites as well as the sale of ‘off the shelf’
properties. 
Page 96 of 140

Page 97

8. Affordable Housing Policy
The ‘Developer Contributions and Affordable Housing Supplementary Guidance’ (2023) is
linked to Policy 20 in the Perth and Kinross Local Development Plan 2 (2019).  It outlines the
contribution developers must make towards affordable housing to enable planning
applications for new residential developments to be supported. This guidance was updated
in 2023 and requires new housing developments to provide a 25% affordable housing
contribution on applicable sites.  Applicable sites being residential developments, including
conversions, consisting of 5 or more units except where the LDP varies this quota on an
individual site basis, or sites of 20 units or less in the City Centre Zone
The guidance outlines PKC’s sequential approach for affordable housing contribution where
onsite provision is preferred, followed by offsite provision, and then a commuted sum if the
first two are not possible. Housing Strategy works with developers and RSLs early on to
ensure the affordable housing component meets the local housing need.  
9. Prioritisation Framework
All new affordable housing proposals for the SHIP are prioritised using the SHIP Prioritisation
Framework (see appendix 4). This framework assesses proposals based on the Council’s
strategic aims, priorities, and project deliverability.  The Council balances investment
decisions through a mix of Council, RSL and developer delivery, considering various
affordable housing tenures to meet housing need across all the HMAs. 
10. Development Constraints
The SHIP has built in an overprovision of 30% to account for slippage. This ensures that if
developments are delayed, there are ample sites available to spend the grant monies that
are made available via the Scottish Government. As noted previously, the RPA for each
financial year needs to be spent within that year and so grant unspent does not roll over to
next year but remains with the Scottish Government, and so development constraints can
have serious effect on the programme. 
The construction sector has faced many challenges in recent years, including the pandemic,
excessive inflation and because of the difficult economic times, there has been a number of
construction companies that have gone into liquidation and so those operating currently
need to mitigate risk and this can mean that development progress can be slow. 
The private sector companies that remain continue to face many obstacles that can affect
development, including: 
• market volatility in the construction sector, impacting on private sector delivery
timescales. 
• increased energy prices.
• high material prices and shortages.
• shortages of labour
• economic uncertainty
• lending challenges 
Page 97 of 140

Page 98

• additional costs associated with developing in rural areas. 
These issues need careful management, however, they also present opportunities for
affordable housing providers.  Off-the-shelf opportunities with private developers have been
used to increase affordable housing supply, as have 100% affordable developments.
However, as the PKC new build programme ramps up with a substantial number of starts
projected for 26/27, off the shelf purchases are likely to be less utilised. Similarly, whilst
100% affordable housing developments will increase delivery of affordable housing, the
system more broadly benefits from a mix of private and affordable housing delivery, which is
something Housing Strategy will endeavour to promote. 
11. Procurement Approaches 
PKC encourages collaborative procurement to deliver programmes effectively.  The Council is
part of the Scotland Excel framework and will also use the HUB framework for procuring
services, where appropriate.  They will also explore offsite and modern construction
methods for new projects to ensure quality and speed.  
12. Equalities
PKC’s Impact and Value Assessment (IVA) process screens and monitors every Council
proposal against statutory and non-statutory environmental, social and economic criteria. It
covers a range of assessment areas including: Strategic and Resource implications, and
impact assessment for Climate Change, Equality & Fairness, Child Rights & Wellbeing,
Sustainable Procurement & Supply, and Strategic Environmental Assessment. 
This screening showed that an Equality & Fairness Impact Assessment was required as there
was likely to be some positive impacts on some protected characteristic groups. A full
assessment was done during the LHS process, which informs the SHIP outcomes, and so this
has been referenced throughout the one done for this SHIP. 
13. Strategic Environment Assessment
The Strategic Environmental Assessment (Scotland) Act 2005 requires plans, programmes,
and strategies to be screened for environmental impact. The SHIP, as part of the LHS, was
pre-screened and found to have no or minimal environmental effects, making it exempt.  
The SEA Gateway has been notified. 
Page 98 of 140

Page 99

Page 99 of 140

Page 100

Appendix 1 Delivery Tables
Table 1. SHIP Period Starts / Approvals 
Project Name  HMA RSL General
Needs
Specialist
/
Supported
W/Chair Total
Affordable
Homes
Tenure Pre-Ship
Starts /
Approvals
26/27
SHIP Period Starts / Approvals
27/28 28/29 29/30 30/31 31/32 
Pre-
SHIP
26-27
Buybacks NA PKC 50 0 0 50 SR 50          
Westfields, Rattray S&G PKC /
HHA 
87 0 16 103 SR /
MMR
54  49       
Castlemains,
Auchterarder
Strathearn PKC 10 0 2 12 SR 12     
Moncrieffe Care Homes,
Bridge of Earn
Greater
Perth 
PKC 38 0 4 42 SR 42         
Almond Valley, Perth Ph1 Greater
Perth 
KHA 28 0 0 28 SR /
MMR
28         
Colville House, Crieff Strathearn PKC 8 0 0 8 SR 8         
Former Balhousie School,
Perth  
Greater
Perth 
PKC 42 0 5 47 SR  47         
East of St Cedd's Road,
Ballinluig
Highland PKC 32 0 3 35 SR 35         
27/28
Buybacks  NA PKC 50 0 0 50 SR   50        
Stanley H30 (ph1) Greater
Perth
KHA 14 0 2 16 SR   16       
Almond Valley, Perth ph2 Greater
Perth 
KHA 36 0 6 42 SR /
MMR 
42    
Hawarden Terrace, Perth Greater
Perth 
Ark 0 12 2 12 SR   12        
Westpark Phase 1,
Blairgowrie
S&G KHA 66 0 7 73 SR/
MMR  
73      
Beechgrove, Perth   Greater
Perth  PKC 26 0 7 33 SR   33        
Oudenarde Site Greater
Perth 
HHA 37 0 4 41 SR    41       
Meadows Bridge of Earn  Greater
Perth
KHA 24 0 3 27 SR   27       
Powmill Kinross-
shire
KHA 7 0 0 7 MMR  7    
Page 100 of 140

Page 101

Project Name  HMA RSL General
Needs
Specialist
/
Supported
W/Chair Total
Affordable
Homes
Tenure Pre-Ship
Starts /
Approvals
26/27
SHIP Period Starts / Approvals
27/28 28/29 29/30 30/31 31/32
Duntaylor Avenue,
Aberfeldy
Highland PKC 39 8 5 52 Mix    52      
Scone North S&G PKC 33 0 4 37 SR/
MMR   
37      
Former Hillside Hospital,
Perth  
Greater
Perth 
HHA 65 0 7 72 SR /
MMR  
30 42     
Kirkmichael S&G CHA 7 0 1 8 SR  8    
Milnab Street, Crieff Strathearn HHA 3 0 2 5 SR  5    
Colonsay Resource
Centre, Perth
Greater
Perth
PKC 7 0 1 8 SR    8       
28/29
Buybacks NA PKC 50 0 0 50 SR     50      
Borlick Phase 1, Aberfeldy Highland PKC 23 8 4 35 SR     35    
St Catherines Sq, Perth Greater
Perth 
PKC 31 0 1 32 SR   32   
Former Crieff Primary,
Crieff
Strathearn PKC  27 0 3 30 SR   30   
Balbeggie H13 Greater
Perth
CHA 27 0 3 30 SR/SE   30   
Townhead Road,
Auchterarder, H342
Strathearn CHA 36 0 4 40 SR/SE   40   
Westpark Phase 2B S&G Ark 0 42 6 42 SR     42     
29/30
Buybacks NA PKC 50 0 0 50 SR       50    
Pleasance Road, Coupar
Angus
S&G HHA 17 0 2 19 SR    19  
Leisure Centre, Pitlochry Highland PKC 9 0 1 10 SR        10  
Rossie Place Ph 1,
Auchterarder
Strathearn PKC 31 0 4 35 SR        35   
Stanley H30 (ph2) Greater
Perth
PKC 28 0 3 31 SR        31  
Dunning H20 Greater
Perth CHA 18 0 2 20 SR/SE    20  
Murray Royal, Perth
MU336
Greater
Perth KHA 16 0 2 18 MMR    18  
Almond Valley Phase 3,
Perth
Greater
Perth
KHA 15 0 0 15 SR    15  
Page 101 of 140

Page 102

Project Name  HMA RSL General
Needs
Specialist
/
Supported
W/Chair Total
Affordable
Homes
Tenure Pre-Ship
Starts /
Approvals
26/27
SHIP Period Starts / Approvals
27/28 28/29 29/30 30/31 31/32 
30/31
Buybacks     50 0 0 50 SR         50  
Visit Scotland Office,
Pitlochry
Highland PKC 2 0 0 2 SR          2 
Atholl Road/Elm Court,
Pitlochry
Highland PKC 16 0 2 18 SR          18 
Abernethy Greater
Perth
PKC 31 0 4 35 SR     35 
Blackford Strathearn HHA 64 0 7 71 SR /
MMR     71 
Moncur Road, Inchture Greater
Perth 
HHA 10 0 2 12 MMR          12 
Pitrocknie Village, Alyth S & G PKC 18 0 2 20 SR     20 
31/32
Buybacks NA PKC 50 0 0 50 SR           50
Captains Glen, Bridge of
Earn
Greater
Perth
PKC 81 0 8 89 SR      89
Glover Street, Perth ph1 Greater
Perth
PKC 27 0 3 30 SR      30                  
1436 70 144 1642  Pre-SHIP  SHIP Period         
276 441 350 198 208 169 
SHIP Period Starts / Approvals – 273 per year 
Table 2. SHIP Period Completions 
Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
26/27 27/28  28/29  29/30  30/31  31/32 
Buybacks NA PKC 50 0 0 50 SR 50          
Stanley H31 Greater
Perth
CHA 11 0 0 11 SR  11 
Page 102 of 140

Page 103

Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
26/27 27/28  28/29  29/30  30/31  31/32 
Pre-
SHIP
26/27
Westpark,
Blairgowrie OTS 
S & G PKC 3 0 0 3 SR 3          
Broich Road, Crieff Strathearn KHA 47 0 5 52 SR 52       
Broich Road, Phase
3
Strathearn KHA 25 0 0 25 MMR  25       
Wester Tomaknock,
Crieff
Strathearn KHA 3 0 0 3 SR 3          
Old Causeway,
Kinross 
Kinross HHA 8 0 0 8 SR 8          
Leslie Court
(Conversion)
Greater
Perth
KHA 8 0 0 8 SR 8          
Forfar Road, Meigle  Strathmore KHA 23 0 2 25 SR  25         
St Andrews Street,
Perth
Greater
Perth
HHA 36 0 2 38 SR / MMR  38     
27/28
Buybacks  NA PKC 50 0 0 50 SR   50        
Hatton Road, Rattray S&G HHA 33 0 5 38 Mix   38       
Westfields, Rattray S&G PKC/
HHA
87 0 16 103 SR / MMR  54 49   
Hawarden Terrace,
Perth
Greater
Perth 
Ark 0 12 2 12 SR   12       
Colville House,
Crieff
Strathearn PKC 8 0 0 8 SR   8       
Powmill Kinross KHA 7 0 0 7 MMR  7    
Castlemains,
Auchterarder
Strathearn PKC 10 0 2 12 SR  12    
East of St Cedd's
Road, Ballinluig
Highland CHA 32 0 3 35 SR    35      
Almond Valley, Perth
Ph1
Greater
Perth 
KHA 28 0 0 28 SR / MMR   28       
Colonsay Resource
Centre, Perth
Greater
Perth
PKC 7 0 1 8 SR   8         
Buybacks NA PKC 50 0 0 50 SR     50      
Page 103 of 140

Page 104

Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
26/27 27/28  28/29  29/30  30/31  31/32 
28/29
Oudenarde Site Greater
Perth 
HHA 37 0 4 41 Mix     41      
Beechgrove, Perth   Greater
Perth 
PKC 26 0 7 33 SR     33      
Duntaylor Avenue,
Aberfeldy
Highland HH 39 8 5 52 Mix     52      
Former Balhousie
School, Perth  
Greater
Perth 
PKC 42 0 5 47 SR     47      
Moncrieffe Care
Homes, Bridge of
Earn
Greater
Perth 
PKC 38 0 4 42 SR     42     
Almond Valley Phase
2, Perth
Greater
Perth
KHA 36 0 6 42 SR   42   
Meadows Bridge of
Earn 
Greater
Perth
KHA 24 0 3 27 SR      27     
Milnab Street, Crieff Strathearn HHA 3 0 2 5 SR   5   
Stanley H30 (ph1) Greater
Perth
KHA 14 0 2 16 SR     16      
Kirkmichael S&G CHA 7 0 1 8 SR   8   
29/30
Buybacks NA PKC 50 0 0 50 SR       50    
Scone North S&G PKC 33 0 4 37 SR/ MMR      37    
Borlick Phase 1,
Aberfeldy
Highland PKC 23 8 4 35 SR      35   
Former Crieff
Primary, Crieff
Strathearn PKC  27 0 3 30 SR    30  
Former Hillside
Hospital, Perth  
Greater
Perth 
HHA 65 0 7 72 SR / MMR      32 40  
Almond Valley Phase
3, Perth
Greater
Perth
KHA 15 0 0 15 SR    15  
Balbeggie H13 Greater
Perth
CHA 27 0 3 30 SR/SE    30  
St Catherines Sq,
Perth
Greater
Perth 
PKC 31 0 1 32 SR    32  
Page 104 of 140

Page 105

Project Name HMA Area RSL General
Needs
Specialist /
Supported W/chair
Total
Affordable
Homes
Tenure Pre SHIP  SHIP Period Completions
26/27 27/28  28/29  29/30  30/31  31/32
Westpark Phase 1,
Blairgowrie
S&G KHA 66 0 7 73 SR / MMR        40 33 
30/31
Buybacks  NA   50 0 0 50 SR         50  
Rossie Place Ph 1,
Auchterarder
Strathearn PKC 31 0 4 35 SR         35  
Westpark Phase 2B S&G Ark 0 42 6 42 SR        42  
Stanley H30 (ph2) Greater
Perth
PKC 28 0 3 31 SR         31  
Dunning H20 Greater
Perth
CHA 18 0 2 20 SR/SE     20 
Murray Royal, Perth
MU336
Greater
Perth
KHA 16 0 2 18 MMR     18 
Townhead Road,
Auchterarder, H342
Strathearn CHA 36 0 4 40 SR/SE     40 
Leisure Centre,
Pitlochry
Highland PKC 9 0 1 10 SR         10  
31/32
Buybacks NA PKC 50 0 0 50 SR           50
Moncur Road,
Inchture
Greater
Perth  HHA 10 0 2 12 MMR           12
Pleasance Road,
Coupar Angus
S&G HHA 17 0 2 19 SR      19
Abernethy Greater
Perth
PKC 31 0 4 35 SR      35
Visit Scotland
Office, Pitlochry
Highland PKC 2 0 0 2 SR          2
Atholl Road/Elm
Court, Pitlochry
Highland PKC 16 0 2 18 SR          18
Pitrocknie Village,
Alyth
S & G PKC 18 0 2 20 SR      20    
1397 70 140 1663  Pre-SHIP SHIP Period Completions         
223 252 412 301 319 156 
SHIP Period Completions – 288 per year
Page 105 of 140

Page 106

Appendix 2 SHIP Grant Funding Tables 
Table 1. SHIP Projects Grant Funding 
Key: Registered Social Landlord (RSL), Kingdom Housing Association (KHA), Ark Housing Association (ARK), Places for People (PfP), Hillcrest Housing Association (HHA), Perth and
Kinross Council (PKC), Caledonia Housing Association (CHA). Social Rent (SR), Shared Equity (SE), Mid-Market Rent (MMR), Wheelchair adapted (WC)
Site RSL Total SR SE MMR WC  HMA Current SHIP New SHIP Period  Total
26/27 27/28 28/29 29/30 30/31 31/32
PKC Buybacks  PKC 200 200 0 0 0 Various  £1,750,000 £1,750,000 £1,750,000 £1,750,000 £1,750,000 £8,750,000
Stanley H30  KHA 16 16 0 0 2 Greater
Perth 
£1,978,000     £1,978,000
Meadows
Bridge of Earn
KHA 27 27 0 0 3 Greater
Perth 
£2,700,000     £2,700,000
Scone North PKC 37 29 0 8 4 Greater
Perth 
£2,500,000 £1,500,000    £4,000,000
Almond Valley,
Perth Ph2
KHA 42 20 0 22 6 Greater
Perth 
£3,340,000 £786,000    £4,126,000
Almond Valley,
Perth, ph3
KHA 15 15 0 0 0 Greater
Perth   
£1,400,000   £1,400,000
Hawarden
Terrace, Perth
Ark 12 12 0 0 2 Greater
Perth 
£1,192,380     £1,192,380
Oudenarde,
Bridge of Earn
HHA 41 41 0 0 4 Greater
Perth 
£2,000,000 £1,073,965    £3,073,965
Moncur Road,
Inchture
HHA 12 0 0 12 2 Greater
Perth    
£750,000  £750,000
Former Hillside
Hospital, Perth
HHA 72 57 0 15 7 Greater
Perth 
£3,000,000 £2,000,000 £2,000,000   £7,000,000
Moncreiffe
Care Home,
Bridge of Earn
PKC 42 34 0 8 4 Greater
Perth
£1,000,000 £3,000,000     £3,000,000
Captains Glen,
Bridge of Earn
PKC 89 89 0 0 8 Greater
Perth     
£3,300,000 £3,300,000
Former
Balhousie
School, Perth  
PKC 47 47 0 0 5 Greater
Perth
£2,000,000 £2,418,000     £2,418,000
Beechgrove,
Perth  
PKC 33 33 0 0 7 Greater
Perth
£500,000 £3,200,000     £3,200,000
Page 106 of 140

Page 107

Site RSL Total SR SE MMR WC  HMA Current SHIP New SHIP Period  Total
26/27 27/28 28/29 29/30 30/31 31/32
Colonsay
resource
Centre
PKC 8 8 0 0 1 Greater
Perth 
£868,384     £868,384
Stanley H30
(ph2)
PKC 31 31 0 0 3 Greater
Perth   
£2,800,000   £2,800,000
St Catherines
Sq, Perth
PKC 32 32 0 0 1 Greater
Perth  
£3,500,000    £3,500,000
Balbeggie H13 CHA 30 24 6 0 3 Greater
Perth 
£2,700,000    £2,700,000
Dunning H20 CHA 20 16 4 0 2 Greater
Perth 
£1,820,000   £1,820,000
Murray Royal,
Perth MU336
KHA 18 0 0 18 2 Greater
Perth   
£1,600,000   £1,600,000
Glover Street,
Perth, Ph1 
PKC 30 30 0 0 3 Greater
Perth     
£3,000,000 £3,000,000
Abernethy PKC 35 35 0 0 4 Greater
Perth    
£3,500,000  £3,500,000
Duntaylor
Avenue,
Aberfeldy 
PKC 52 39 0 8 5 Highland   £2,343,000 £4,000,000    £6,343,000
Leisure Centre,
Pitlochry
PKC 10 10 0 0 1 Highland     £1,000,000   £1,000,000
Visit Scotland
Office,
Pitlochry
PKC 2 2 0 0 0 Highland     £200,000  £200,000
Atholl Road
/Elm Court,
Pitlochry
PKC 18 18 0 0 2 Highland      £1,800,000  £1,800,000
Borlick Phase
1, Aberfeldy
PKC 35 35 0 0 4 Highland    £3,500,000    £3,500,000
East of St
Cedd's Road,
Ballinluig
PKC 35 35 0 0 3 Highland  £2,550,000 £750,000     £750,000
Powmill KHA 7 0 0 7 0 Kinross-
shire 
£570,000     £570,000
Townhead
Road,
CHA 40 34 6 0 4 Strathearn    £2,000,000 £1,700,000   £3,700,000
Page 107 of 140

Page 108

Site RSL Total SR SE MMR WC  HMA Current SHIP New SHIP Period  Total
26/27 27/28 28/29 29/30 30/31 31/32
Auchterarder,
H342
Rossie Place
(Ph 1),
Auchterarder
PKC 35 35 0 0 4 Strathearn    £3,350,000   £3,350,000
Milnab Street,
Crieff
HHA 5 5 0 0 2 Strathearn   £648,463     £648,463
Blackford HHA 71 51  0 20 Strathearn     £2,500,000 £4,000,000 £6,500,000
Former Crieff
Primary
School, Crieff
PKC 30 30 0 0 3 Strathearn   £3,000,000    £3,000,000
Westpark
Phase 1,
Blairgowrie
KHA 73 34 0 39 4 Strathmore £1,000,000 £3,000,000 £3,000,000    £6,000,000
Westpark
Phase 2B,
Blairgowrie
Ark 42 42 0 0 6 Strathmore    £2,000,000 £2,200,000  £4,200,000
Pitrocknie
Village,
Glenisla
PKC 20 20 0 0 2 Strathmore     £2,000,000  £2,000,000
Pleasance
Road, Coupar
Angus
HHA 19 19 0 0 2 Strathmore    £2,300,000   £2,300,000
Westfields,
Rattray 
HHA /
PKC
103 78 0 25 16 Strathmore £4,000,000 £5,500,000     £5,500,000
Kirkmichael  CHA 8 8 0 0 0 Strathmore  £850,000     £850,000               
Total   1494 1291 16 162 151   £41,608,227 £28,809,965 £21,720,000 £14,700,000 £12,050,000 £118,888,192
RPA         £17,508,000 £18,033,000 £18,574,000 £18,574,000 £18,574,000 £91,263,000
RPA plus
slippage (30%)       
£22,760,400 £23,442,900 £24,146,200 £24,146,200 £24,146,200 £118,641,900               
Table 2. 
SHIP Projects being grant funded by HMA (does not include buybacks)
Page 108 of 140

Page 109

Greater Perth Highland Kinross Strathearn Strathmore
689 152 7 181 265 
Table 3. 
SHIP Projects being funded by RSL (does not include buybacks)
Perth and Kinross Council Kingdom Housing Association Hillcrest Housing Association  Ark Housing Association  Caledonia Housing Association 
675 198 269 54 98 
Page 109 of 140

Page 110

Appendix 3 Empty Homes Returns
Private Sector Empty Homes Returns
The tables below relate to private properties brought back into use with help from PKC Empty Homes
Service. These have been taken directly from the yearly returns local authorities need to submit to
the Empty Homes Partnership, which is operated by Shelter Scotland on behalf of the Scottish
Government. Scottish Government guidance on drafting the SHIP requires us to provide this
information within the SHIP. 
2025/26 Empty Homes Returns
Length of time empty  No. of properties
Less than a year 12
1-2 years  16
2-5 years  23
5-10 years 7
10+ years  5
Unknown  26
Total  89 
2024/25 Empty Homes Returns 
Length of time empty  No. of properties 
Less than a year 4
1-2 years  15
2-5 years  28
5-10 years 11
10+ years  7
Unknown  28
Total  93 
2023/24 Empty Homes Returns
Length of time empty  No. of properties
Less than a year 3
1-2 years  11
2-5 years  21
5-10 years 3
10+ years  14
Unknown  28
Total  80 
Page 110 of 140

Page 111

Appendix 4 Prioritisation Framework 
Prioritisation Framework
Introduction 
Our Prioritisation Framework provides a tool to prioritise investment, it balances the Scottish
Government’s ambitions contained in Housing to 2040, and Perth and Kinross Council’s Local
Housing Strategy (LHS) outcomes. 
Partner Housing Associations that operate in the area have been asked to submit proposals, in an
agreed format, for any sites that are not currently in the SHIP that they wish to be considered for
funding. 
The framework does not provide the only assessment of priority, and the Council will continue to
balance its investment decisions to ensure housing need across the Housing Market Areas is met,
and that there is an appropriate split between rural/urban and greenfield/brownfield delivery, as per
LHS outcomes. 
As achieving strategic objectives is crucial, it is essential that we ensure only those projects that can
be delivered are included. For this reason, the framework operates a 2-step process, whereby a pre-
screening exercise is undertaken initially, before proposals are then scored against our matrix. 
Pre-Screening 
Any sites proposed that are outwith development boundaries, as per LDP, will automatically be
screened out unless they have planning consent, either outline, or detailed, or can be justified
through NPF4.
All other sites will be considered as part of the pre-screening process, whereby a review of the site
will be considered by Perth and Kinross Council’s Housing Strategy Team. This review will include a
check on the sites planning history, potential site constraints, and may include discussions with
Planning about the proposal. These sites will then be reviewed against the detail and scale of the
project. 
There are 3 potential outcomes of pre-screening: 
1 Progress to site scoring.
2 Refusal to score until planning consent given.
3 Agree to score though only on a reduced number of units. 
Agreement to proceed to site scoring is not an assurance that the site will ultimately be delivered as
per the proposal, only that initial checks have been carried out to ensure that the Council have
satisfied itself, based on current knowledge that there are no obvious impediments to its delivery. 
Proposals that do not provide a contribution to the LHS target to deliver 10% of new supply
affordable housing that is wheelchair or adaptable standard, will be screened out, unless there are
exceptional circumstances related to the site that make this prohibitive, and/or through agreement
with Housing Strategy. This standard includes both Wheelchair User and Older / Ambulant Disabled
User standard contained in Housing for Varying Needs document. 
Site Scoring 
Page 111 of 140

Page 112

To ensure fairness and transparency, each proposal, unless screened out, will be scored against set
criteria listed below. As noted above, whilst this is the basis for investment decisions, it cannot be the
only tool that is used, as the sites selected for inclusion need to assist in achieving the LHS outcomes,
and so this needs to be considered alongside site scoring. 
Priority 1 considers whether the proposal meets housing need.  This will be assessed using different
data sets, including applicant waiting lists, scale of existing stock and current turnover, Housing Need
and Demand Assessment (HNDA), and future supply. 
Priority 2 considers whether the proposal reflects a ‘brownfield first’ approach and helps bring back
into use sites that would benefit the community.
Priority 3 considers where the sites are on their development journey, prioritising those that are
more progressed.
Priority 4 considers whether the proposal will provide fully wheelchair adapted properties.
Priority 5 considers whether project can be cross funded and bring in alternative funding streams. 
Priority 6 considers how deliverable the proposals are. This is to ensure that priority is not given to
sites that are unlikely to be brought forward. 
Priority 7 considers whether the proposal meets wider strategic priorities. Examples include
provision of supported housing, regeneration projects, substantial over provision of wheelchair or
adapted housing, achieving other LHS outcomes. 
Some elements of the scoring will be based on objective factual information, while others will rely on
professional judgement. 
Scoring Criteria
1. Meets Housing Need 
• High (3)
• Medium (2)
• Low (1) 
2. Site attributes
• Listed Building (1)
• Vacant and Derelict Land Register (1)
• Long term empty building (1)
• Brownfield (1)
• Buildings at Risk (1) 
3. Development status 
• Detailed planning consent (2)
• Planning in principle (1)
• Land acquired (1)
• Allocated LDP housing site (1) 
4. Includes fully wheelchair adapted housing 
• 10% delivery (3) 
• 5% delivery (2)
Page 112 of 140

Page 113

• Less than 5% (1) 
5. Can harness other funding streams e.g Rural Housing Fund (2) 
6. Deliverability 
• High (3)
• Medium (2)
• Low (1) 
7. Meets Wider Strategic Priorities (3)
Overall scoring
An overall score will be assigned to each site and used to inform its prioritisation as low, medium
or high priority, as set out below.
Low (1-4) Medium (5-9) High (10+) 
Page 113 of 140

Page 114

Page 114 of 140

Page 115

Our vision is a Perth and Kinross where everyone can live life
well, free from poverty and inequality
___________________________________________________________________  
Committee or Board: Housing & Social Wellbeing Committee 
Date of Meeting: 30 September 2026 
Report Title: Annual Assurance Statement 2025/2026 – Scottish
Housing Regulator 
Report Number: 26/265 
Report Author:  Elaine Ritchie – Strategic Lead – Housing &
Communities 
Organisational Lead: Strategic Lead – Housing & Communities
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to comply with the Scottish Housing Regulator’s
Regulatory Framework. The Council is required to approve and submit an
Annual Assurance Statement, giving assurance that it is meeting the
legislative and regulatory standards for social housing in Scotland. This report
provides an overview of the assurance process and presents the Annual
Assurance Statement 2025/26 for approval by Committee. 
1.2 Sections 
1. Purpose
2. Recommendation(S)
3. Background
4. Annual Assurance Statement Overview
5. Improvement Actions
6. Evidence To Support Assurance 2025/26
7. Tenant And Service Users’ Assurance
8. Self-Assessment
9. Conclusion
10. Impact Value Assessment
11. Background Papers
12. Appendices 
8
Page 115 of 140

Page 116

2. Recommendation(s) 
It is recommended that the Committee: 
2.1 Notes the outcome of the Council’s Housing Service’s 2025/26 self-
assessment against the Scottish Housing Regulator's Regulatory Framework
and the evidence supporting compliance with relevant statutory and regulatory
requirements. 
2.2 Approves the Annual Assurance Statement, as detailed in Appendix 3, for
submission to the Scottish Housing Regulator. 
3. Background/Main Issues 
3.1 Context 
3.1.1 All social housing landlords are required to publish an Annual Assurance
Statement in line with guidance within the Scottish Housing Regulator’s (SHR)
published Regulatory Framework. The Framework details the SHR’s
statement on performance of functions, and sets out how they regulate
Registered Social Landlords, as well as housing and homelessness services
delivered by Local Authorities. 
3.1.2 Within the Framework, the SHR carry out their work in the following broad
ways: 
• Gathering and publishing data in ways that tenants and other
stakeholders can use
• Seeking assurance from landlords and acting where they need to
• Undertaking thematic activity and scrutiny on specific areas of work and
performance 
3.1.3 Central to their approach is landlords assuring themselves, their tenants and
the SHR through landlord self-assurance. 
3.1.4 Every Registered Social Landlord and Local Authority is responsible for
delivering good outcomes and services for their tenants and service users.
The SHR is clear that landlords must be self-aware, analytical, open, and
honest about their performance and identify and drive improvement activities. 
3.1.5 When considering whether to engage with landlords, the SHR will initially
consider what they have done to assure themselves that they are meeting
regulatory requirements. In line with this requirement, all landlords must
prepare an Annual Assurance Statement to confirm to their tenants and the
SHR that they are meeting regulatory requirements. 
4. Annual Assurance Statement Overview 
4.1 Since April 2019, there has been a requirement for all Local Authorities and
Registered Social Landlords to submit an Annual Assurance Statement which
Page 116 of 140

Page 117

must be agreed by the relevant Local Authority Committee. Statements
should confirm the landlord’s level of compliance with the requirements
detailed within the Framework, including: 
• All relevant standards and outcomes in the Scottish Social Housing
Charter
• All relevant legislative duties
• Details of any areas of material non-compliance, briefly describing plans
and a timeframe to improve
• Confirmation that the relevant Local Authority Committee have seen and
considered appropriate evidence to support the level of assurance 
4.2 A signed and unsigned copy of the Annual Assurance Statement must then
be provided to the SHR, who will then make the unsigned version publicly
available. There is also a requirement for landlords to ensure the Statement is
easily and readily available for tenants. 
4.3 The Service has assessed its compliance against the requirements of 
Chapter 3 of the Scottish Housing Regulator's Regulatory Framework and is 
satisfied that it has substantially complied with all relevant requirements. This 
confirms that the Service: 
• Delivered against the relevant standards and outcomes of the Scottish
Social Housing Charter for tenants, people experiencing homelessness
and other service users.
• Met its statutory obligations relating to housing and homelessness
services, equality duties and human rights responsibilities.
• Achieved a high level of compliance with tenant and resident safety
requirements. A very small number of properties remained outstanding
for electrical safety inspections (4 properties) and fire detection
equipment installations (36 properties) at year end. These cases were
primarily linked to properties undergoing refurbishment works and
ongoing challenges in securing access to some homes. Robust actions
were in place to address the outstanding cases, with further progress
made during 2026/27. 
4.4 The Service also made substantial progress in delivering the improvement
actions set out within the SHR's Engagement Plan for the Double Dykes and
Bobbin Mill Gypsy/Traveller sites. This reflects the Service's commitment to
strengthening accommodation standards, enhancing communication and
engagement, and ensuring services are delivered in a fair, respectful and
culturally sensitive manner. 
4.5 Significant progress continued during 2025/26 on the major redevelopment of 
the Double Dykes Gypsy/Traveller site. Despite the complexity of the project 
and a range of delivery challenges, the programme is now nearing 
completion, with only final external improvement works remaining. The project 
has transformed the site through the delivery of 20 new energy-efficient 
chalets, alongside extensive infrastructure, drainage and environmental 
improvements. 
Page 117 of 140

Page 118

The investment represents a significant step forward in  improving living
conditions, energy efficiency and the overall quality of  accommodation
available to residents. 
4.6 At Bobbin Mill, a detailed feasibility study has been completed to support the 
replacement of the existing six chalets. Ongoing engagement and 
consultation with residents is helping to shape the design and specification of 
the new accommodation, ensuring future investment reflects the needs and 
preferences of the community. 
4.7 To support sustained improvement and strengthen relationships with 
residents, additional resources have been invested in Gypsy/Traveller 
services, including the establishment of a dedicated Gypsy/Traveller Liaison 
Officer post. This role has enhanced day-to-day communication, resident 
engagement and support, helping to build trust, improve service 
responsiveness and ensure residents' views continue to influence service 
development. Whilst significant progress has been made, the Service 
recognises that further work remains to strengthen outcomes, resident
confidence and long-term site sustainability. 
5. Improvement Actions 
5.1 The Service remains committed to a culture of continuous improvement and
maintains a comprehensive improvement plan that is informed by
performance reporting, tenant feedback, complaints learning, benchmarking
information and Annual Return on the Charter outcomes. This approach
enables the Service to identify emerging risks, monitor progress effectively
and deliver targeted improvements that enhance outcomes for tenants,
residents and service users. 
5.2 During 2025/26, improvement activity focused on areas that have the greatest
impact on customer experience and service performance, refer to Appendix 2
for further details. Key areas of work included strengthening communication
around repairs, enhancing damp and mould prevention and case
management, reducing void turnaround times, improving the monitoring and
resolution of anti-social behaviour cases, supporting tenancy sustainment,
preventing rent arrears and expanding tenant engagement opportunities. 
5.3 Maintaining the safety of tenants and residents remains a core priority.
Targeted improvement actions have been implemented to address the small
number of outstanding electrical safety inspections and fire detection
equipment installations, supported by robust contractor management
arrangements and regular performance monitoring. These actions are
underpinned by strengthened governance arrangements, enhanced
management oversight and clear improvement plans, helping to ensure
continued compliance and assurance in this critical area of service delivery. 
Page 118 of 140

Page 119

6. Evidence to Support Assurance 2025/26 
6.1 Alongside the Housing Service Improvement Action Plan, robust
management, governance and democratic accountability arrangements are in
place to support effective decision-making, provide constructive challenge,
and ensure clear oversight of service performance, outcomes and impact for
tenants, residents and communities. 
6.2 These arrangements are supported by a comprehensive framework of
strategic and operational planning processes that ensure services remain
responsive to the needs of tenants and service users, while driving continuous
improvement. Business Management and Improvement Plans set out clear
priorities, actions, performance measures and expected outcomes for each
service area, providing a structured approach to monitoring delivery and
assessing impact. This framework is further strengthened by the Council's
statutory Local Housing Strategy, which establishes the long-term vision,
priorities and investment plans for housing across Perth and Kinross and
supports the achievement of the Scottish Social Housing Charter outcomes. 
6.3 Performance and improvement activity are subject to regular monitoring and
scrutiny through the Housing Management Team and Executive Leadership
Team, ensuring that progress, risks and areas for improvement are routinely
reviewed and addressed. Public accountability is provided through reporting
to the Council's thematic committees and Scrutiny Committee, with financial
performance and value-for-money considerations reported through the
Finance and Resources Committee. The Council's Internal Audit, Risk
Management and Corporate Governance arrangements also contribute to the
overall assurance framework. 
6.4 The evidence and assurance framework required by the SHR forms an
integral part of the Council's wider self-assessment and governance
arrangements. This evidence supports the Annual Assurance Statement and
contributes to the Council's Annual Governance Statement, providing
assurance that effective controls, governance arrangements and performance
management processes are in place. Appendix 1 provides an overview of the
key sources of evidence that underpin the Annual Assurance Statement. 
7. Tenant and Service Users Assurance 
7.1 Listening to tenants and service users remains central to how the Housing
Service plans, delivers and improves services. Throughout 2025/26, a wide
range of engagement activities were undertaken to ensure tenant views
informed service delivery, performance assessment and future priorities. This
included tenant satisfaction surveys, tenant conferences, rent consultation,
ePanel feedback, focus groups, the Housing Revenue Account (HRA)
Monitoring Group, Estate Based Initiatives and targeted engagement with
specific tenant groups. Collectively, these approaches have strengthened our
understanding of tenant priorities and provided valuable insight to shape
service improvement. 
Page 119 of 140

Page 120

7.2 In June 2025, the Housing Management Team and Tenant & Resident
Engagement Team hosted an interactive hybrid engagement session with
tenants and service users to review the Housing Service's performance during
2024/25. The session provided an opportunity for participants to scrutinise
performance information, discuss service priorities and identify opportunities
for improvement. Feedback received has informed both the Annual Landlord
Performance Report and the Annual Assurance Statement, demonstrating the
important role tenants play in the Service’s performance and assurance
framework. 
7.3 To further strengthen our understanding of tenant experience, the Service
commissioned independent market research specialists, Knowledge
Partnership, to undertake a comprehensive tenant satisfaction survey. Using
a combination of face-to-face and telephone interviews, the survey secured
feedback from a representative sample of tenants, providing robust and
independent assurance on service performance. 
7.4 The 2025/26 survey engaged over 1,200 tenants and demonstrated strong
performance across the key indicators set by the SHR. Overall tenant
satisfaction increased to 80.0%, reflecting continued improvements in service
delivery and customer experience. Satisfaction with communication reached
80.42%, satisfaction with opportunities to participate in decision-making was
75.50%, and satisfaction with the Service's contribution to neighbourhood
management was 75.67%. Satisfaction with the repairs service remained
exceptionally high at 97.71%, highlighting the continued effectiveness of this
core frontline service. 
7.5 Tenant participation in the annual rent-setting process continued to
demonstrate strong levels of engagement and influence. A total of 2,782
tenants took part in the consultation, with 72.3% supporting the proposed
6.5% rent increase option. Benchmarking undertaken through Scotland's
Housing Network identified Perth and Kinross Council as one of the strongest-
performing landlords in Scotland for tenant engagement in rent-setting,
providing confidence that tenants are meaningfully involved in important
decisions affecting housing services and investment priorities. 
7.6 Tenant participation and engagement opportunities have continued to expand
and evolve. During 2025/26, the revised Tenant Participation Strategy was
implemented, supported by dedicated Tenant Participation Workers focusing
on Gypsy/Traveller communities, homelessness services and older persons'
housing. In addition, plans are being progressed to establish locality-based
tenant forums and a Youth Engagement Forum, ensuring a broader range of
voices are heard and reflected in service design and delivery. These
developments provide strong assurance that tenant feedback is not only being
sought but is actively influencing decision-making, service improvement and
future investment priorities across the Service. 
Page 120 of 140

Page 121

8. Self-Assessment 
8.1 The Service maintains a robust and ongoing approach to self-assessment to
provide assurance on performance, compliance and service quality.
Throughout 2025/26, performance was systematically reviewed using a wide
range of evidence, including performance and benchmarking data,
management oversight, tenant feedback, complaints learning, audit findings
and the Annual Return on the Charter. This comprehensive approach has
enabled the Service to identify strengths, monitor emerging risks and target
improvement activity where it will have the greatest impact on outcomes for
tenants. 
8.2 Self-assessment considered performance across all key areas of service
delivery, including repairs, complaints handling, anti-social behaviour, tenancy
sustainment, void management, adaptations, rent arrears, the Scottish
Housing Quality Standard (SHQS), tenant and resident safety, and damp and
mould prevention and management. This has provided a strong evidence
base for the Annual Assurance Statement and supports the Service's
commitment to continuous improvement and achieving better outcomes for
customers. 
9. Conclusion 
9.1 The Housing Service continued to deliver strong performance and positive
outcomes for tenants, residents and communities throughout 2025/26, while
maintaining compliance with the Scottish Housing Regulator's requirements
and driving forward a significant programme of service improvement.
Performance remained strong across a number of key indicators, with overall
tenant satisfaction increasing to 80.0%, repairs satisfaction remaining
exceptionally high at 97.71%, emergency repairs completed within an average
of 3.53 hours, and 100% compliance achieved for annual gas safety servicing.
These results demonstrate the Service's continued focus on delivering high-
quality, customer-focused services. 
9.2 Alongside maintaining strong day-to-day performance, the Service has taken
proactive action to address areas of challenge and emerging risk. Significant
progress has also been made in improving Gypsy/Traveller accommodation
and engagement, strengthening tenant participation, and ensuring tenant
feedback directly informs service planning and improvement. 
9.3 Taken as a whole, the evidence presented through performance monitoring,
self-assessment, tenant engagement, audit activity and governance
arrangements provides a strong level of assurance that the Housing Service
is meeting its statutory and regulatory obligations, delivering positive
outcomes for tenants and service users, and maintaining a clear focus on
continuous improvement. 
Page 121 of 140

Page 122

9.4 This assurance process supports the Council's wider commitment to ensuring
that people can live well, free from poverty and inequality, by maintaining
safe, high-quality homes and responsive housing services that meet the
needs of tenants, residents and communities. 
9.5 The Committee is therefore asked to approve the Annual Assurance
Statement, confirming its satisfaction that appropriate evidence has been
considered, that the requirements of the SHR have been met, and that
effective arrangements are in place to sustain compliance, manage risk and
deliver ongoing service improvement. 
10. Impact and Value Assessment 
10.1 An Impact and Value Assessment is not required for this report as it has been
classified as an operational report with no new or additional strategic or
resource implications. 
11. Background Papers 
No background papers were relied upon during the preparation of this report. 
12. Appendices 
Appendix 1 – An overview of information to support the Annual Assurance
Appendix 2 – Performance Overview Briefing
Appendix 3 – Annual Assurance Statement
Page 122 of 140

Page 123

Appendix 1
Detailed below is an overview of information to support the Annual Assurance
Statement for 2025/26.
• Local Housing Strategy 2022-2027 - the Perth and Kinross Local Housing
Strategy was approved by Committee on 15 March 2023 (Report 23/82 refers) 
Local Housing Strategy - Perth & Kinross Council (pkc.gov.uk) 
• Local Housing Strategy Update and Progress Report - Local Housing Strategy
- Perth & Kinross Council (pkc.gov.uk) 
• Strategic Housing Investment Plan 2025/26–2029/30 approved by Housing &
Social Wellbeing Committee on 29 October 2025 (Report 204/25 refers) –
SHIP 2025/26–2029/30 - SHIP 25-26 - 2029/30 
• Perth and Kinross Council Annual Performance Report 2024/25 was
approved by Committee on 29 October 2025 (Report 204/25) – Annual
Performance Report for 2024/25 
• Housing Revenue Account (HRA) Strategic Financial Plan Incorporating the
5-Year Capital Investment Programme, Rent Strategy, Reserves Strategy and
Other Housing Charges for 2026/27 was approved by Housing & Social
Wellbeing Committee on 22 January 2026 (Report 25/9 refers) – HRA
Strategic Financial Plan 2026/2027
• Annual Performance Report for tenants – the Council is required to publicise
to tenants, its performance against the 16 national Scottish Social Housing
Charter outcomes. The overall outcome of this is included within the Annual
Performance Report. 
Housing Service performance - Perth & Kinross Council (pkc.gov.uk) 
• The Corporate Plan 2022/2023-2027/2028 conveys the Council's vision for
Perth and Kinross. Importantly it provides strategic direction for the
organisation, informs decision making and facilitates prioritisation of activity
and resources. 
Corporate Plan Introduction - Perth & Kinross Council (pkc.gov.uk) 
• The Community Plan/Local Outcomes Improvement Plan 2022/32 identifies
the high-level strategic objectives the Council is working towards to meet local
needs. 
Community planning - Perth & Kinross Council (pkc.gov.uk) 
8
Page 123 of 140

Page 124

• The Council reports on performance against indicators in the Local
Government Benchmarking Framework. This data can be found on the My
Local Council portal which shows how Councils are performing across a
range of council services with comparisons to other Local Authorities and the
national average. 
• We periodically publish our performance online as well as in our report. We
are committed to analysing our performance as a Housing Service and
reporting the results to our tenants. Our aim is to continually improve the
services we provide to local people. 
Housing Service performance - Perth & Kinross Council (pkc.gov.uk) 
Page 124 of 140

Page 125

Appendix 2
Performance Overview Briefing 
Purpose
This briefing provides an overview of Perth and Kinross Council Housing Services’
2025/26 Annual Return on the Charter (ARC) submission to the Scottish Housing
Regulator. It summarises the key areas of performance, provides context around the
main results, and outlines improvement activity planned or already underway. 
Background
The Annual Return on the Charter is submitted each year to the Scottish Housing
Regulator and sets out how social landlords are performing against the outcomes
and standards in the Scottish Social Housing Charter. The return covers a wide
range of Housing Service activity, including tenant satisfaction, communication,
repairs, complaints, tenancy sustainment, rent collection, voids, adaptations,
homelessness-related lets, and housing quality. 
The 2025/26 return shows that Housing Services continues to deliver strong
performance across several key areas, while also recognising the pressures
affecting the wider housing sector, including increased demand, rising costs, access
issues, complex tenancy needs, homelessness pressures, and the impact of the cost
of living on tenants.  
Key Strengths
Repairs and Compliance
• Emergency repairs completed in an average of 3.53 hours, based on over
7000 emergency repair work orders, well within the 4-hour target.  This
ensured that homes remained safe, secure and habitable while minimising
disruption for tenants.
• Repairs satisfaction remained exceptionally high at 97.71%, demonstrating
strong tenant confidence in the repairs service and the quality of work
delivered.
• 100% gas servicing compliance achieved across the housing stock,
providing assurance that all tenants are living in homes that meet essential
gas safety requirements.
• 99.95% EICR compliance and 99.57% fire safety compliance achieved –
full compliance not achieved due to properties being upgraded and tenant
access issues. However, high levels of compliance ensured homes remained
safe, reducing risk to tenants and supporting ongoing statutory compliance
across the housing stock. 
8
Page 125 of 140

Page 126

Tenant Engagement and Participation
• Overall tenant satisfaction and the number of tenants satisfied with
opportunities given to participate in decision making increased to over 80% -
representing a 2.70% increase. This demonstrates that tenants feel more
informed, listened to and able to influence decisions that affect their homes
and communities. 
• Owner satisfaction with the Factoring Service continued to improve, reaching
91.67% - representing a 26% increase. This reflects greater confidence in
the quality, responsiveness and value of service delivered to owners. 
• 2,782 tenants took part in the annual rent consultation. High levels of
participation ensured rent-setting decisions were informed by tenant views,
helping to strengthen transparency, accountability and trust.
• Perth and Kinross Council was recognised through SHN benchmarking as
having one of the strongest levels of tenant engagement in the rent setting
process.
Adaptations and Tenancy Sustainment
• 434 home adaptations completed, an increase of 30 adaptations from the
previous year. This meant more residents were able to live independently and
safely in their own homes, improving wellbeing and supporting longer-term
independence.
• Average adaptations completion time reduced from 33.5 days to 19.9 days.
Faster delivery of adaptations enabled tenants to access essential support
sooner, reducing delays and helping them remain safe and settled at home.
• Tenancy sustainment improved to 91.58%, an increase of 0.36% from the
previous year. This resulted in more households successfully maintained their
tenancies, increasing housing stability and reducing the risk of homelessness
and repeat housing need.
• 115 properties were purchased through the buyback scheme, significantly
exceeding the target of 40. The expansion of the buyback programme
substantially increased the supply of affordable housing, helping more
households access a permanent home and reducing pressure on temporary
accommodation and housing waiting lists.
Neighbourhood Management and Anti-Social Behaviour
• Satisfaction with neighbourhood management increased from 73.3% to
75.7%.  Improved satisfaction indicates that some tenants feel their
neighbourhoods are cleaner, safer and better managed, contributing to
stronger and more sustainable communities.
• ASB case resolution performance improved from 79.60% to 83.21%. More
effective resolution of anti-social behaviour helped improve community safety,
Page 126 of 140

Page 127

reduce the impact of incidents on residents, and increase confidence in the
Council's ability to respond to local concerns.
Key Challenges
While overall performance remains positive, several areas continue to experience
pressure:
• Void re-let times increased to 31.31 days, compared with 24.87 days in
2024/25. This was due to changes in the indicator technical guidance. Without
the guidance changes, performance would have been broadly comparable
with the previous year.  Benchmarking data indicates we are among the
highest-performing authorities nationally, placing the Service within the
top quartile for void turnaround times. 
• Rent collection reduced to 98.58% from 100.17% in 2023/24, reflecting wider
economic pressures on tenants although performance remains strong relative
to national benchmarks. The previous year’s performance was also affected
by the 53-week accounting year, a factor reflected across all local authorities
in Scotland. 
• Gross rent arrears remained broadly stable at 8.84%, a 0.01% increase from
2023/24. However, more tenants are now in arrears, partly due to the
migration from legacy benefits to Universal Credit. 
• Scottish Housing Quality Standard (SHQS) compliance remained broadly
stable at 79.73%. However, stock growth through the Buy Back programme,
alongside an increase in properties exempt or in abeyance, meant a 100%
target is not achievable. 
• Gypsy/Traveller resident satisfaction reduced from 72.22% to 66.67% during
a period of significant investment and improvement across site
accommodation. The slight decrease reflects temporary disruption from the
live refurbishment programme, while the investment in improved living
conditions is expected to deliver lasting benefits.   
Improvement Priorities for 2026/27
Housing Services has already commenced a range of improvements, including:
• The implementation of a new Term Maintenance Framework in July 2026
which will strengthen our ability to respond to tenant needs by increasing
contractor capacity, improving service resilience and supporting the continued
delivery of high-quality maintenance services.
• Enhanced void management arrangements, including daily planning meetings
and improved performance reporting, to strengthen the Service's ability to
maximise housing stock, bringing homes back into use more quickly and
Page 127 of 140

Page 128

helping more households access secure accommodation at the earliest
opportunity.
• Continued investment in environmental sensors and enhanced damp and
mould case management to strengthen prevention and early intervention,
improving the quality of homes and supporting better health outcomes for
tenants.
• Continued investment in the Financial Inclusion Project, Tenancy Sustainment
Fund and Welfare Rights services to provide targeted support to tenants
facing financial difficulties, helping to maximise household income, sustain
tenancies and improve wellbeing outcomes for individuals and families.
• Continued investment in kitchens, bathrooms, heating systems and energy
efficiency improvements to enhance the quality and energy performance of
homes, helping to create warmer, healthier and more affordable homes for
tenants while supporting the Council’s net zero ambitions
• Expansion of tenant engagement opportunities through locality forums and
targeted outreach to underrepresented groups to create more inclusive
opportunities for participation, ensuring a broader range of tenant
perspectives help shape services, improve outcomes and strengthen
communities.
• Improved resident satisfaction through meaningful engagement with
Gypsy/Traveller residents will ensure their views directly inform service
improvements and investment priorities, strengthen relationships, and
increase confidence in the services provided.
Conclusion
The 2025/26 ARC return demonstrates that the Housing Service continues to deliver
positive outcomes for tenants and communities across Perth and Kinross. Strong
performance across key service areas has helped to ensure tenants live in safe,
well-maintained homes, have opportunities to influence decisions, sustain their
tenancies, and access the support they need to live independently.
The improvement activity identified reflects a continued commitment to putting
tenants at the centre of service delivery through investment in homes and
communities, strengthened compliance arrangements, improved communication and
engagement, and a preventative, person-centred approach that supports better
outcomes, increased satisfaction and stronger, more resilient communities. 
Page 128 of 140

Page 129

Appendix 3 
Our Annual Assurance Statement 
We can advise that during 2025/26 Perth and Kinross Council Housing Service
complied with the regulatory requirements as set out in Chapter 3 of the Scottish
Housing Regulator's Framework. This confirms that we:
• Delivered against the relevant standards and outcomes of the Scottish Social
Housing Charter for tenants, people experiencing homelessness and other
service users.
• Met our statutory obligations relating to housing and homelessness services,
equality duties and human rights responsibilities.
• Achieved a high level of compliance with tenant and resident safety
requirements. A very small number of properties remained outstanding for
electrical safety inspections (4 properties) and fire detection equipment
installations (36 properties) at year end. These cases were primarily linked to
properties undergoing refurbishment works and ongoing challenges in
securing access to some homes. Robust actions were in place to address the
outstanding cases, with further progress made during 2026/27. 
We recognise the small number of properties that remain outstanding for electrical 
8
Page 129 of 140

Page 130

safety inspections and fire detection equipment upgrades and take assurance from 
the robust actions in place to address these.  We also acknowledge the significant
progress achieved through ongoing engagement with residents at the Double Dykes
and Bobbin Mill Gypsy/Traveller sites. 
From the various service performance reports, combined with the management and
democratic scrutiny structures, which are all designed to provide the proper scrutiny
of performance and the achievement of outcomes, along with the Service’s
Improvement Action Plan, we confirm that we have seen and considered sufficient
evidence to give us assurance that the Housing Service is meeting the SHR
regulatory requirements.  
To meet our level of assurance we considered appropriate evidence against each of 
the requirements as set out by the Scottish Housing Regulator, and we will continue
to review assurance throughout the course of the year. 
The Annual Assurance Statement for 2025/2026 was presented at the meeting of
our Housing & Social Wellbeing Committee on 30 September 2026. 
I sign this statement on behalf of the Housing & Social Wellbeing Committee: 
Housing Convener’s Signature:                                                   Date: 
Page 130 of 140

Page 131

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Housing and Social Wellbeing Committee 
Date of Meeting: 30 September 2026 
Report Title: Investing in Communities Fund 
Report Number: 26/266 
Report Author: David Stokoe, Service Manager, Community Learning
and Development 
Organisational Lead: Elaine Ritchie, Strategic Lead, Housing and
Communities.
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to seek approval on delivery of the Investing in
Communities Fund (ICF) for 2026/27 and 27/28. 
1.2 Sections 
1. Purpose
2. Recommendation(S)
3. Background/Main Issues
4. Impact Value Assessment
5. Appendices 
2. Recommendation(s) 
It is recommended that the Housing and Social Wellbeing Committee: 
2.1 Approves the blended participatory budgeting decision-making process for the
Investing in Communities Fund, combining a facilitated community
assessment with a public preference vote, as set out in section 3.2.12 of the
report; 
2.2 Approves the proposal for the geographical funding allocation based on
identified needs (option 2), as set out in section 3.3.2 of the report; 
2.3 Approves the proposal for Perth City Wards to be treated as one area, as set
out in section 3.3.4 of the report; 
9
Page 131 of 140

Page 132

2.4 Approves the reallocation of any underspend in the funding as set out in
section 3.3.5 of the report. 
3. Background/Main Issues 
3.1 Historic Information/Context 
3.1.1 As part of the Council budget setting process for 2026/27 and 2027/28, £350K
was allocated each year to improve quality of life by reducing the impacts of
poverty and the cost of living through addressing issues that matter locally. 
3.1.2 This supports delivery of the PKC Strategic Objectives of Tackling Poverty
and Working in Partnership with Communities 
3.1.3 In 2025/26 Community Investment Fund (CIF) and Participatory Budgeting
(PB) were delivered via a single process of community engagement to identify
issues, workshops to develop project proposals and a single application and
voting process, using PB. 
3.1.4 PB is a process through which community members directly influence how
public money is spent. PKC has previously used a public voting model in
which residents vote on eligible projects following a screening process.
Evaluation of the 2025/26 process also identified the value of facilitated ward-
level collaboration and concerns that a vote alone can favour organisations
with greater campaigning reach. The proposed model therefore retains a
direct public voice while strengthening needs-led discussion and assessment. 
3.1.5 The table below summarises the evaluations of the 2025/26 process: 
Positives Negatives
Weighting of the funding towards
areas of highest socio-economic
need.
Engagement levels were lower than
anticipated in some areas, indicating
a need for different outreach
methods.
Introducing engagement within the
process provided meaningful
opportunities for residents to identify
and influence priorities within their
local areas.
Using a multiple-choice list within the
survey may have inadvertently
limited respondents
ability to express wider views or
innovative ideas.
Collaboration workshops with
community groups enabled
partnership working and reduced
duplication of effort.
Community groups reported that the
timing of the decision on Warm
Welcome funding limited
their ability to plan and implement
activity as effectively.
Community groups welcomed the
simplified application process.
Concerns that funding outcomes
could reflect the ability to campaign
for votes, rather than evidenced
community need or shared,
collaboratively agreed priorities
Page 132 of 140

Page 133

Transitioning the voting platform to
Microsoft Forms successfully
removed previous technical
barriers and improved overall
accessibility. 
3.2 Options Available to Elected Members/Board Members 
3.2.1 Proposal for Investing in Communities 2026/27 and 2027/28. 
3.2.2 The Investing in Communities Fund is underpinned by a PB approach, placing
communities at the centre of decision-making. It aims to empower local
people to identify priorities, shape solutions and influence how public
resources are allocated to improve quality of life and mitigate the impacts of
poverty and the cost of living. The process is designed to be supportive,
transparent and inclusive, ensuring meaningful participation and shared
ownership of local outcomes. 
3.2.3 It is proposed that the project runs from October to February as set out below. 
3.2.4 Stage 1. Discovery Phase 
During the Discovery Phase, existing locality data will be reviewed alongside
targeted engagement with community groups, families, children and young
people, residents, elected members and stakeholders. 
Purpose:
• To build a shared understanding of local priorities.
• To identify the types of projects that communities feel would best address
the aims of the fund. 
3.2.5 Particular focus will be placed on engaging individuals and communities who
are traditionally less likely to participate, including those experiencing poverty,
rural isolation or other barriers to engagement, ensuring their voices shape
early priorities. This stage focuses on listening, gathering insights and
ensuring communities influence the direction of investment from the outset.
Early engagement strengthens PB by ensuring that decisions are grounded in
lived experience and community-defined need rather than predetermined
priorities. 
3.2.6 Families, children and young people impacted by cost-of-living and inequality
issues will be actively engaged through the Fairer Futures Project. This will
help develop understanding of the challenges they face within their
communities and potential solutions. Fairer Futures is a Scottish Government-
funded programme aimed at reducing child poverty and is currently being
delivered in Perth and Kinross using a place-based approach in Letham,
Perth City (Muirton and North Muirton), South Crieff, Coupar Angus, Aberfeldy
and Rattray. Existing engagement in these communities will help capture the
views of people who may not traditionally engage in a PB process or other
local decision-making forums. 
Page 133 of 140

Page 134

Workshops will be accessible and supportive, enabling participation from a
wide range of community representatives, including smaller groups and those
with limited capacity. A range of engagement methods will be used as set out
in Appendix A. 
3.2.7 Stage 2. Application Phase 
Groups will be invited to submit project proposals based on the priorities
identified during the Discovery Phase. 
Purpose:
• To provide a simple, accessible and fair application process.
• To ensure all submissions reflect the priorities identified in Phase 1. 
3.2.8 Stage 3. Screening Phase 
All applications will undergo an assessment by officers and elected members
to ensure they meet the fund’s core criteria and clearly respond to the
priorities identified by the community. 
Purpose:
• To confirm eligibility, ensure alignment with the fund’s aims and establish
that proposals are sufficiently developed to progress community decision-
making. 
3.2.9 This stage provides a robust quality assurance process, ensuring that only
appropriate and deliverable proposals that meet the criteria proceed. It
supports transparency, consistency and confidence for applicants,
participating communities and decision-makers. 
3.2.10 Stage 4. Community Assessment Phase 
Applications that pass the screening phase will be considered through
facilitated community assessment sessions in each funding area. Participants
will include community groups, residents, young people and relevant local
partners. Eligible projects will be presented and discussed openly, with
participants considering the extent to which each proposal responds to locally
identified priorities, addresses poverty and inequality, is deliverable and will
benefit local residents. 
3.2.11 Following discussion, participants will score each eligible proposal against the
published criteria. The community assessment score will account for 60% of
the final project score. Facilitation and consistent scoring guidance will
support fairness, constructive dialogue and transparent decision-making.
Participants will be required to declare any interest in an application and will
not score proposals where a conflict of interest applies. 
Page 134 of 140

Page 135

Purpose:
• To strengthen needs-led and collaborative decision-making at a local
level.
• To ensure smaller, newer and less well-connected groups can participate
on an equitable basis.
• To assess proposals consistently against community priorities, need,
impact and deliverability.
• To encourage shared understanding, partnership working and avoidance
of duplication. 
3.2.12 Stage 5. Public Preference Voting Phase 
All applications considered through the Community Assessment Phase will
also be presented to residents through a public preference vote. In-person
voting will be supported through a series of PB roadshows in communities
where applications have been received, including smaller rural communities
adjoining larger towns. Schools, campuses, community centres and village
halls may be used as accessible voting locations. Participants will receive a
short summary of each project and the funding requested and will be asked to
identify their preferred projects. 
3.2.13 Officers will explore options for online voting to enable participation by those
unable to vote in person due to mobility issues, caring responsibilities or other
barriers. Appropriate controls will be applied to protect the integrity of the vote
including collection of postcodes. The public preference vote will account for
40% of the final project score. 
Purpose:
• To retain a clear and direct role for residents in final funding decisions.
• To make the process visible, accessible and open to the wider
community.
• To balance broad public preference with structured consideration of need,
impact and deliverability.
• To reduce the risk of public voting alone determining outcomes on the
basis of campaigning reach or organisational size. 
3.2.14 Stage 6. Results and Payment Phase 
The community assessment score and public preference vote will be
combined to produce a final weighted score for each project: 60% community
assessment and 40% public preference. Projects must achieve the minimum
standards established through screening and community assessment to be
eligible for funding. Funding will then be offered in ranking order within the
available allocation for each area, subject to final due diligence and the
provisions for the central reserve and underspend set out in sections 3.3.2
and 3.3.5. 
Page 135 of 140

Page 136

3.2.15 All applicants will be notified of the outcome. Successful applicants will
receive their funding allocation and elected members will be updated on
outcomes. Unsuccessful projects will be offered feedback and support to
explore collaboration, refinement or alternative funding where appropriate. 
Purpose:
• To ensure the final decision reflects both informed community deliberation
and wider resident preference.
• To ensure projects can begin promptly and deliver benefits to
communities without delay.
• To provide a clear, auditable and transparent route from assessment and
voting to award.
• To make elected members aware of projects funded within their ward
areas. 
3.2.16 The overall process will enable: 
• Greater and more inclusive engagement with residents and organisations,
particularly those experiencing poverty or disadvantage, ensuring their
voices influence priorities and decisions.
• Communities to influence allocation through both facilitated local
assessment and a direct public preference vote.
• A transparent PB approach that is community-led, evidence-based and
targeted where it can achieve greatest local impact.
• Elected members and council officers to screen eligibility and feasibility,
cross-reference existing community and public service provision, avoid
duplication and identify opportunities for external funding.
• Community assessment participants to consider local need, impact and
deliverability before the wider public preference is applied.
• Unsuccessful projects to receive feedback and support to explore
alternative funding or partnership opportunities.
• Projects to start quickly and deliver timely benefits for communities. 
3.2.17 The blended model strengthens the Council’s approach to PB by embedding
participation at every stage, from identifying priorities through to final decision-
making. It retains the visibility and accessibility of public voting while
responding to evaluation findings that a vote alone may favour larger or
better-connected organisations. The structured, phased approach supports
meaningful participation by individuals and communities who are often least
likely to engage and gives greater weight to locally evidenced need, impact
and deliverability. 
3.3. Proposals for Funding allocation 
3.3.1 Option 1 
Each area is given an equal share of 50% of the overall funding allocation
with the remaining 50% being split evenly between the areas of highest
inequalities in line with our Fairer Futures Partnerships.
Page 136 of 140

Page 137

Ward Area  50% Equal Share  50% Top up  Totals 
Carse of Gowrie  £14,583.33   £0  £14,583.33  
Strathmore  £14,583.33   £29,166.7  £43,749.99 
Blairgowrie & Glens  £14,583.33   £29,166.67  £43,749.99 
Highland  £14,583.33   £29,166.67  £43,749.99 
Strathtay  £14,583.33   £0  £14,583.33  
Strathearn  £14,583.33   £29,166.67  £43,749.99 
Strathallan  £14,583.33   £0  £14,583.33  
Kinross-shire  £14,583.33   £0  £14,583.33  
Almond & Earn  £14,583.33   £0  £14,583.33  
Perth City South  £14,583.33   £0  £14,583.33  
Perth City North  £14,583.33   £29,166.67  £43,749.99 
Perth City Centre  £14,583.33   £29,166.67  £43,749.99 
TOTALS  £174,999.96  £175,000.02 £ 349,999.98 
3.3.2 Option 2 
Each area is given an equal share of 50% of the overall funding allocation.
Areas with higher inequalities are given an uplift of £20,000. £55,000 will
be retained in a central reserve to support resident participation in the process
and remove barriers and to support eligible projects that meet the funding
criteria and score highly but cannot be fully supported within their ward’s
remaining allocation following the voting process.  Officers will make
recommendations to ward members on options for funding projects in
oversubscribed areas. 
Ward Area  50% Equal Share  Inequalities Top
Up 
Totals 
Carse of Gowrie  £14,583.33   £0  £14,583.33  
Strathmore  £14,583.33   £20,000  £34,583.33 
Blairgowrie & Glens  £14,583.33   £20,000  £34,583.33 
Highland  £14,583.33   £20,000  £34,583.33 
Strathtay  £14,583.33   £0  £14,583.33  
Strathearn  £14,583.33   £20,000  £34,583.33 
Strathallan  £14,583.33   £0  £14,583.33  
Kinross-shire  £14,583.33   £0  £14,583.33  
Almond & Earn  £14,583.33   £0  £14,583.33  
Perth City South  £14,583.33   £0  £14,583.33  
Perth City North  £14,583.33   £20,000  £34,583.33 
Perth City Centre  £14,583.33   £20,000  £34,583.33 
TOTALS  £174,999.96  £120,000  £294,999.96 
3.3.3 It is recommended that Option 2 be adopted for this year’s ICF to allow for
flexibility in meeting need in ward areas oversubscribed with successful
projects.
Page 137 of 140

Page 138

3.3.4 In addition it is proposed that the 3 Wards comprising of Perth City South,
North and Central are combined and treated as one single area as residents
routinely access services across ward boundaries and many organisations
deliver city-wide rather than ward-specific services. 
3.3.5 Any unspent funds will be reallocated to projects that met the assessment
criteria and achieved a sufficient scoring level but could not be funded due to
a lack of available resources. The use of unspent funds will be overseen
through Stage 5, as outlined in section 3.2.12. 
3.3.6 Rationale for Recommendations made in Section 2 
• Residents access services across the city area regardless of Ward areas. 
• Community groups may be based in one Ward but deliver services across
all ward areas. 
• Treating Perth City as one combined area will allow the participatory
decision-making workshops to ensure there is a fair spread of funding
across all 3 Ward areas. 
• The proposal for delivery of the ICF in 2026/27 and 2027/28 takes
account of key learning, evaluations and feedback from communities,
elected members and council officers on the previous year’s Fairer
Communities for All funding programme, CIF, PB and Warm
Spaces/Warm Welcome. The blended approach retains public
participation while strengthening collaborative, needs-led assessment and
reducing reliance on campaigning reach alone. 
• Learning and evaluation from the 2026/27 ICF programme, including
participation levels, equality of access, stakeholder 
4. Impact Value Assessment 
This report has been classified as being an operational report and as such
does not require a full Impact and Value Assessment.   
5. Appendices 
Appendix 1 – Engagement Methods 
Page 138 of 140

Page 139

Appendix 1
Engagement Methods 
The section below sets out some of the engagement methods which will be utilised 
during the lifespan of the project to ensure barriers to participation are removed and 
the voices of a wide range of residents help shape the priorities and decide on the 
allocation of funding. 
• The Discovery Phase will use facilitated small-group discussions to make it
easier for the following people/groups to contribute meaningfully:
o younger participants
o underrepresented residents
o first-time applicants
o marginalised groups 
• During the Collaboration and Application Phase support will be offered to
develop ideas and applications. Support will be offered to ensure an equitable
process between grassroots groups and well-established organisations with
the following help and assistance:
o collaborative workshops
o proposal-writing workshops
o template applications 
• The Screening Phase will include elected members not just council officers
to increase legitimacy.
• A mixed screening panel to include:
o technical staff
o Elected members
o Community council reps where available 
• Participatory Decision-Making Phase to promote equitable and meaningful
involvement from groups who are often underrepresented in civic
engagement. Examples include:
o young people
o disabled residents
o carers
o migrants
o shift workers
o lower-income residents 
Participation in this phase will be structured to ensure that individuals involved in
decision-making are broadly representative of the communities within each ward
from which applications have been received, supporting fairness, diversity of
perspective, and local accountability. 
• Discovery, Collaboration and Decision-Making Phases will incorporate a
range of flexible and accessible participation methods to support broad
engagement, including:
o online input
o weekend sessions
o pop-up engagement in community spaces
9
Page 139 of 140

Page 140

o leaflet distribution
o posters on noticeboards
o Input from PKAVS TSI and Local Anchor Organisations
o key locality partners – Schools, Youth work Partnership etc.
o provision of translated materials 
• Practical barriers which inhibit participation will be addressed, wherever
possible, through the provision of:
o transport 
o accessible venues
o ESOL and literacy support
o digital access
Page 140 of 140