Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
24/01/2024 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 31 January 2024 at 13:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Stewart Donaldson  (Convener)
Councillor Grant Laing  (Vice-Convener)
Bailie Chris Ahern
Bailie Alasdair Bailey
Councillor Peter Barrett
Councillor Andy Chan
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor John Duff
Councillor David Illingworth
Provost Xander McDade
Councillor Tom McEwan
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Page 1 of 146

Page 2

Page 2 of 146

Page 3

Finance and Resources Committee 
Wednesday, 31 January 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE FINANCE AND RESOURCES
COMMITTEE OF 22 NOVEMBER 2023 FOR APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 24/38) 
9 - 10 
5 PROCUREMENT UPDATE
Report by Strategic Lead - Legal and Governance (copy herewith
24/39) 
11 - 70 
6 REVENUE BUDGET 2023/24 - UPDATE NO. 3
Report by Strategic Lead - Finance and Business Support (copy
herewith 24/40) 
71 - 104 
7 COMPOSITE CAPITAL BUDGET 2023-28 & HOUSING
INVESTMENT PROGRAMME 2023-28 - MONITORING REPORT
NO. 3
Report by Head of Finance (copy herewith 24/41) 
105 - 130 
8 FLEXIBLE WORKING FRAMEWORK
Report by Corporate Human Resources Manager (copy herewith
24/42) 
131 - 146 
Page 3 of 146

Page 4

Page 4 of 146

Page 5

FINANCE AND RESOURCES COMMITTEE 
Minute of hybrid meeting of the Finance and Resources Committee held in the
Council Chamber, 2 Hight Street, Perth on Wednesday 22 November 2023 at
3.00pm. 
Present: Councillors S Donaldson and G Laing, Bailie C Ahern and Bailie A Bailey,
Provost X McDade, Depute Provost Parrott, and Councillors K Allan (substituting for
Councillor J Duff), P Barrett, A Chan, D Cuthbert, E Drysdale, D Illingworth,
T McEwen, J Rebbeck, C Shiers, Councillor C Stewart. 
In Attendance: T Glen, Chief Executive; K Donalson, Chief Operating Officer;
C Mailer, Director (Strategy, People and Resources); B Renton, Executive Director
(Communities); S Devlin, Executive Director (Education and Children’s Services);
M Butterworth, C France, F Crofts, E Ritchie, C Guild, S Coyle and J Ferguson
(Communities); G Boland and C Palmer (Education and Children’s Services);
L Simpson, S MacKenzie, S Walker, P Johnstone, S Crawford,  K Fraser, G Stewart,
L Stewart, N Sutherland, V Robertson, K Molley, A Brown and M Pasternak (all
Corporate and Democratic Services). 
Apology: Councillor J Duff 
Councillor S Donaldson, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting and an apology was
noted above. 
2. DECLARATIONS OF INTEREST 
There were no declarations made in terms of the Councillors’ Code of
Conduct. 
3. MINUTE OF PREVIOUS MEETING 
The minute of meeting of the Finance and Resources Committee of
13 September 2023 was submitted and approved as a correct record. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
The status of action in the Outstanding Business Statement (23/314) be noted
and completed actions removed accordingly. 
THE VICE-CONVENER LED ON THE FOLLOWING ITEM. 
5. REVENUE BUDGET 2023/24 – UPDATE NO. 2 
There was submitted a report by Strategic Lead – Finance & Business
Support (23/315) providing an update on progress with the 2023/24 General Fund
Revenue Budget based upon the August 2023 ledger, updated for any subsequent
3
Page 5 of 146

Page 6

known material movements; and the projected financial position of the Housing
Revenue Account. 
Resolved:
(i) The contents of the Report 23/315, be noted.
(ii) It be approved to implement the Real Living Wage from 1 December 2023, at
an estimated cost of approximately £2,000.
(iii) The projected outturn for General Fund Services set out in Section 5 and
Appendix 1 and 2 of Report 23/315, be noted.
(iv) The projected outturn for Corporate Budgets set out in Section 6 of Report
23/315, be noted.
(v) The funding update provided in Section 7 of Report 23/315, be noted.
(vi) The projected outturn for the Housing Revenue Account, which is summarised
in Section 8 and Appendix 4 of Report 23/315, be noted. 
(vii) The adjustments to the 2023/24 Management Revenue Budget detailed in
Sections 8, 9, 10 & 11 and Appendices 1, 2, 4, 5, 6 and 7 of Report 23/315,
be approved.
(viii) The financial risks set out in Section 12 and Appendix 8 of Report 23/315, be
noted.
(ix) It be approved to reallocate £175,000 of funding from the Budget to help
communities prepare for future weather events. 
THE CONVENER LED ON THE FOLLOWING ITEMS. 
6. COMPOSITE CAPITAL BUDGET 2023/28 & HOUSING INVESTMENT
PROGRAMME 2023/28 – MONITORING REPORT NUMBER No.2 
There was submitted a report by Head of Finance (23/316) (1) providing a
summary position to date for the 5-year Composite Capital Budget and the 5-year
Housing Investment Programme for 2023/24 to 2027/28 and; (2) seeking approval
for adjustments to the programmes. 
Resolved:
(i) The contents of Report 23/316, be noted.
(ii) The proposed adjustments to the five-year Composite Capital Budget 2023/24
to 2027/28 set out in Sections 5 and 6 of Report 23/316 and summarised in
Appendices I and II of Report 23/316, be approved.
(iii) The proposed adjustments to the Housing Investment Programme Budget
2023/24 to 2027/28 set out in Section 7 of Report 23/316 and summarised in
Appendix III of Report 23/316, be approved. 
7. TREASURY ACTIVITY AND COMPLIANCE REPORT 2023/24 QUARTER 1 
There was submitted a report by Head of Finance (23/317) updating the
Committee on Treasury Activity for the quarter ending 30 September 2023 and to
report on compliance with the Council’s Treasury Management Policy Statement
(TMPS); Investment Strategy and Prudential Indicators. 
Resolved:
(i) The contents of Report 23/317, be noted.
(ii) The revised limits for depositing funds with Money Market Funds, as detailed
in Section 6 of Report 23/317, be approved.
Page 6 of 146

Page 7

(iii) It be agreed for the Treasury Activity and Compliance updates to be reported
to the Finance and Resources Committee every six months instead of
quarterly. 
8. PROCUREMNET UPDATE 
Resolved: 
Due to the delayed start time of the meeting, the Committee agreed for the
Procurement Update Report to be postponed to the Finance and Resources
Committee on 31 January 2024. 
9. FAIR WORK STATEMENT 
There was submitted a report by Corporate Human Resources Manager
(23/319) providing an update on the Scottish Government requirements relating to
Fair Work First Criteria, their use in public sector grants, contracts and other funding
and the content of the required public statement. 
Resolved:
(i) It be approved to use the Modern Apprentice Scheme Earmarked Reserve in
2024/25 to support the implementation of the payment of the Real Living
Wage to Apprentices and Trainees with effect from 1 April 2024. 
(ii) The position on flexible working provision, as required by the Fair Work First
criteria, be noted. 
(iii) Discussions to continue with Trade Unions to finalise the attached draft
statement evidencing how Perth & Kinross Council currently meets and
continues to develop the Fair Work First Criteria. 
10. LEADERSHIP REVIEW UPDATE – HEALTH & SOCIAL CARE
PARTNERSHIP – SENIOR LEADERSHIP STRUCTURE 
There was submitted a report by Chief Officer/Director – Integrated Health
and Care (23/320) providing a further update on the Leadership Review which was
reported to Finance and Resources Committee on 20 June 2023 (Report 23/195),
specifically relating to the review of strategic leadership roles in the Health and
Social Care Partnership led by the Chief Officer/Director – Integrated Health and
Care.   
Resolved:
(i) The contents of Report 23/320, be noted. 
(ii) The implementation of the senior leadership structure for the Health & Social
Care Partnership, acknowledging that these new integrated roles are subject
to joint arrangements, be approved.  
Page 7 of 146

Page 8

Page 8 of 146

Page 9

FINANCE AND RESOURCES COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 24/38) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action 
due
Action
Expected
18. 22 November
2023 
Item 5
Revenue Budget
2023/24 – Update
No.2
Provide information
to Members on how
funding from the
Scottish Government
has been recycled
across the Local
Government funding
block.
Email response was
issued to members. 
COMPLETED
Scott Walker  31 January
2024 
31 January
2024 
19.  22 November
2023 
Item 5 
Revenue Budget
2023/24 – Update
No. 2
Provide data to
Members on the
increased fuel
related costs on
Tayside Contracts in
delivering school
meals. 
Elected Member
Briefing Note was
issued. 
COMPLETED 
Greg Boland 31 January
2024 
31 January
2024 
20. 22 November
2023 
Item 5 
Revenue Budget
2023/24 – Update
No. 2 
In the Housing
Revenue Account
2023/24, it states a
£344,000 shortfall to
the HRA due to the
reduced number of
newbuilds.
Provide data to
members on the
number of houses. 
Email response was
issued to members. 
COMPLETED 
Steven Coyle  31 January
2024 
31 January
2024 
4
Page 9 of 146

Page 10

No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action 
due
Action
Expected
21.  22 November
2023 
Revenue Budget
2023/24 – Update
No. 2
To increase scrutiny
and assurance,
representatives from
Tayside Contracts be
invited to future
meetings of Perth
and Kinross
Council’s Scrutiny
and Performance
Committee.
An Elected Member
Briefing Session on the
structure of Tayside
Contracts/Minute of
Agreement will be
arranged for members
in due course. 
Representatives will be
invited to a future
meeting of the Scrutiny
and Performance
Committee.   
NOT COMPLETED 
Legal and
Governance 
TBC TBC
Page 10 of 146

Page 11

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE – 31 JANUARY 2024 
PROCUREMENT UPDATE 
Report by Strategic Lead - Legal and Governance
(Report No. 24/39) 
1. PURPOSE 
This report provides an update on the Council’s procurement activity, setting
out an Annual Procurement Report for financial year 2022/23 and the planned
procurement activity for future years. 
2. RECOMMENDATION 
2.1 It is recommended: 
The Finance and Resources Committee is requested to: 
• Approve for publication the Procurement Annual Report 2022/23;
• Note the record of tenders accepted during 2022/23 under the Councils
scheme of delegation;
• Note the planned procurement activity as far as known for future years;
and
• Note monies provided to third parties under the Code of Guidance for
Following the Public Pound during 2022/23. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
Section 4: Background
Section 5: Proposal
Section 6: Conclusion
Appendix 1: Procurement Annual Report 2022/23 
4. BACKGROUND 
4.1 This report records the procurement activity carried out by the Council during
2022/23. The appended report gives more detail on the procurement
contribution to achieving the aims and objectives of the Council. 
4.2 Annual reporting on procurement activity became a statutory duty following
the implementation of the Procurement Reform (Scotland) Act 2014 (the Act)
and the Council is required to provide both a retrospective Annual Report, as
well as setting out its procurement activity going forward. 
5
Page 11 of 146

Page 12

4.3 This report has been prepared in line with guidance issued by the Scottish
Government.  The statutory duties set out by the Act are explicit and include a
requirement to provide information on all regulated procurement exercises.
The Government guidance provides a template to ensure all reporting public
bodies in Scotland provide broadly comparable data. 
4.4 The Act requires that notification of publication of our Annual Report be made
to the Scottish Ministers.   
4.5 Subject to approval by this committee, the Annual Report will be published on
the Council’s website to meet the Scottish Government reporting
requirements. 
5. PROPOSAL 
5.1 This reporting requirement is set out in: 
▪ the Council’s Scheme of Administration;
▪ the Council’s Contract Rules; and
▪ the Code of Guidance for FPP 
which establish the requirement for Executive Directors to report on the how
the Council attends to its tenders and the monies it provides to third parties
annually. 
5.2 The publication of this type of information enhances transparency in our
purchasing activities and helps us to promote the opportunities for working
with Perth and Kinross Council. 
5.3 The report includes analysis of the numbers and sizes of businesses located
in the Perth and Kinross area who have registered an interest in the provision
of goods and services, or conclusion of works on behalf of the public sector in
general. 
5.4 The final Procurement Update (2023/24) on the current strategy will be
submitted to Finance and Resources Committee in June 2024, along with a
new five year strategy.  The strategy will be aligned with the new Corporate
Plan objectives and will be revised annually. 
5.5 Strategic procurement and commissioning is one of the Council’s
transformation projects.  As a result of this, the new strategy has been
delayed allowing initial workstreams to be identified.  During 2023/24 there will
be transitional work undertaken between the current and new strategies. 
6. CONCLUSION 
6.1 The Annual Report presented provides an overview of the procurement work
undertaken on behalf of the Council in 2022/23. 
6.2 The Contract Delivery Plan presented provides information on anticipated
planned procurement activity as far as known for future years.
Page 12 of 146

Page 13

7. APPENDICES 
Appendix 1 – Procurement Annual Report 2022/23 inc, Tenders Accepted
2022/23, Contract Delivery Plan 2023/24, and Following the Public Pound
Report 2022/23. 
Authors
Name  Designation Contact Details
Lynzi Stewart
Vanessa Robertson
Procurement Team
Leader
contracts@pkc.gov.uk 
Approved
Name  Designation Date
Karen Donaldson  Chief Operating Officer November 2023 
Page 13 of 146

Page 14

Page 14 of 146

Page 15

Perth and Kinross Council
2 High Street
Perth
PH1 5PH
contracts@pkc.gov.uk
Procurement 
Annual Report 
2022-23 
Appendix 1 
5
Page 15 of 146

Page 16

Perth and Kinross Council  2 
Contents
1. Introduction ...................................................................................................................................................... 4
2. Vision for procurement .................................................................................................................................... 4
3. Context ............................................................................................................................................................. 4
4. Information on Contracts ................................................................................................................................. 5
5. Highlights .......................................................................................................................................................... 7
6. Delivering Best Value ........................................................................................................................................ 9
7. Reporting, Review and Benchmarking Performance ...................................................................................... 13
8. Strategy Ownership and Contact details ........................................................................................................ 13
Appendix A - Key Statistics 2022-23 ................................................................................................................... 14
Appendix B – Tenders Accepted & Following the Public Pound Report ............................................................ 15
Appendix C – Perth and Kinross Council Contract Delivery Plan 2023/24 ......................................................... 43 
Page 16 of 146

Page 17

Perth and Kinross Council  3 
The Council agreed a two year Procurement Strategy in November 2021.  This report
records the procurement activity for under that strategy for financial year April 2022 to
March 2023.  The report focusses on the variety of ways in which this activity has
supported the delivery of the Council’s strategic outcomes. 
The report also provides assurance that the Council’s working practices are meeting the
legislative and regulatory requirements under the Procurement Reform (Scotland) Act 2014
and associated regulations.  
Council spend with third parties during 2022/23 was c£324 million. This relates to the
procurement of goods, works and services, services commissioned via arm’s length
organisations (ALEOs) and Tayside Contracts. The figure also includes monies allocated
to support Capital investment decisions taken by the Council.   
The chart below shows the total spend over the last four years.  This illustrates a year on
year increase in respect of spend, with the exception of the period 2020/21, which was
directly attributable to the COVID-19 pandemic. 
248,017,710
235,251,572
269,889,396
323,744,249
2019-20
2020-21
2021-22
2022-23
Total £ Spend
Page 17 of 146

Page 18

Perth and Kinross Council  4 
1. Introduction 
Given the financial challenges facing local government and the wider public sector there is
a greater focus and need for procurement activity to deliver efficiencies and support new
models of service delivery. 
Our approved Procurement strategy recognises that effective, planned procurement is key
to achieving the strategic objectives as set out in the Community and Corporate Plans for
Perth and Kinross and to delivering best value. 
During 2022/23 we have continued to focus on how our procurement activity supports the
delivery of agreed strategic outcomes set out below and how we can secure additional
social value from the way in which we work with our supply chain. 
• Giving every child the best start in life
• Supporting people to lead independent, healthy and active lives
• Developing educated, responsible and informed citizens
• Creating a safe and sustainable place for future generations
• Promoting a prosperous, inclusive and sustainable economy 
2. Vision for procurement   
“To achieve commercial excellence in our procurement activities and ensure that we
deliver Best Value services to the communities of Perth and Kinross and do so in an
effective, efficient, ethical and sustainable way that delivers local economic,
environmental and social benefits.’’   
3. Context    
Our approach to procurement is shaped by the complexity of our business and the
landscape in which local government operates which provide the 
drivers for change that have informed our strategy.  The Scottish Model of Procurement,
shown below, sets high level objectives for all public bodies to consider when working with
supply markets and this is also reflected in our strategic approach. 
o For each procurement exercise, a full
assessment of the ways in which the
desired contract will meet our
objectives is undertaken and built into
the specification issued to
prospective bidders. 
o Consideration is given to
engagement with those affected by
the procurement exercise – this
includes, as appropriate, the
communities in which the contract will
Page 18 of 146

Page 19

Perth and Kinross Council  5 
be delivered, the potential local
supply base, and Council staff
affected by the contract.   
o Options for how the contract might be
delivered is also considered, with a
review of potential provider solutions
including, arm’s length organisations,
supported businesses, not-for-profit
organisations and smaller
businesses, including start-ups. 
4. Information on Contracts   
Transparency and good governance are key to effective public sector procurement.
Perth & Kinross Council ensures visibility to the market of opportunities to bid for public
sector contracts by using the national advertising portal Public Contracts Scotland.  For the
reporting period all Council contract opportunities with a contract value greater than
£50,000 are advertised where there is no existing formal arrangement available.  Those
contract opportunities with a value lower are issued using a “Quick Quote” process through
the same portal.  
The legal and internal governance requirements for our procurement activity are set out in
legislation and within our Contract Rules and these vary according to the value of the
contract. 
• Those above a Regulatory defined threshold must be tendered following the Public
Contracts (Scotland) Regulations 2015.   
• Contracts between £50,000 and the Regulatory threshold must follow the
procurement approach as set out in Procurement (Scotland) Regulations 2016.   
• For contracts valued between £5,000 and £50,000 we will invite quotations from a
minimum of 3 bidders as set out in the Council’s Contract Rules.  
Contracting Activity for the period    
Each financial year, we publish a Contract Delivery plan derived from the budget planning
process. This plan sets out, in broad terms, the intended procurement work over the
reporting period, and includes some longer-term projects. 
In 2022/23, the Council spent c £324 million with external parties. 
The 2022/23 Contract Delivery Plan published in November 2022, included an anticipated
173 distinct pieces of procurement work and 203 were concluded during the reporting
period.  A number were in progress at the end of the financial year and the remainder are
anticipated to be concluded in 2023/24.  It is also worth noting that some budget
commitments listed in the Contract Delivery Plan relate to contracts that can be concluded
through use of existing commercial agreements – removing the requirement for the Council
Page 19 of 146

Page 20

Perth and Kinross Council  6 
to carry out a full procurement exercise.  One such example is Replacement Windows and
Doors where a call-off was issued via an existing framework. 
An overview of contracts awarded in 2022/23 is attached in Appendix B.  
Local Supplier Support 
In addition to our transparent approach to the publication of contract opportunities, the
Council works to support and upskill local businesses to try to ensure they have the
necessary skills and understanding of how best to access and be successful in public
procurement exercises.  The Council is an active participant in the Supplier Development
Programme and hosts regular supplier support events throughout the year including a
number in the local area: 
Meet the Buyer events – PKC support National and Local events, attracting exhibitors from
across the Tayside public sector, as well as large contractors working in the Tayside area. 
The events are typically attended by local SMEs and Supported businesses, generating
very positive feedback, along with spin-off one to one training sessions being provided to
individual delegates to assist them in bidding for future public sector opportunities.  The
2023 Tayside Meet the Buyer event took place in March and was attended by 268
Suppliers. 
Of the suppliers registered on Public Contracts Scotland (the Scottish national contracts
portal), 891 are registered as being located in Perth and Kinross, an increase from the
comparative figure of 826 in 2021/22. 
The Council has a policy of encouraging local businesses to bid for public sector work
where possible – in the reporting period >£76m (23.5%) of Council spend was recorded as
being with local suppliers.  This is an increase of circa £10m from 2021/22.  The table
below shows the total local supplier spend over the last four years. 
Financial Year Value (£) % of total spend
2022/23   76,060,652 23.5
2021/22 66,927,315 25.6
2020/21 59,070,267 22.8
2019/20   59,798,680 21.9
Page 20 of 146

Page 21

Perth and Kinross Council  7 
Of the suppliers registered on the portal from Perth and Kinross, 94% are defined as small
and medium-sized enterprises (SMEs). 
The range, in terms of employee numbers, of the Perth and Kinross based businesses
registered on the portal is set out in the table below. 
Size of businesses in Perth and Kinross
registered on PCS
Large (over 250 employees) 52
Medium (50-249 employees) 77
Small (10-49 employees) 183
Micro (1-9 employees) 579
Total 891 
Contracts Register 
To improve the transparency around contracts held by the Council, we also publish a
Contracts Register.  A searchable format of the Register can be viewed via Public
Contracts Scotland website. 
The search functions on Public Contracts Scotland can be used as a data source for
exploring the contracting plans of a wide range of public bodies, including Perth & Kinross
Council.  It is possible to search for specific contracts or themes and the data can also be
downloaded as an Excel spreadsheet or a .csv file. 
5. Highlights 
The Council’s Procurement Strategy and policies apply to all the Council’s external
expenditure on goods, services and works.  The purpose of each procurement exercise
carried out by the Council should be to deliver outcomes that support one or more of the
Council’s Corporate Plan objectives.  The ways in which some of our recently awarded
contracts have contributed to our objectives are described below. 
Giving every child the best start in life 
In the reporting period the procurement team supported the tendering of a contract for
Independent Advocacy Services for Children and Young People, which provides support to
children involved with Social Work services to ensure their voice is heard and their views
are taken into account in their care planning. 
Page 21 of 146

Page 22

Perth and Kinross Council  8 
Educated, responsible and informed citizens 
The Council’s procurement work supports this corporate objective in a variety of ways: 
It supports our Education and Children’s Service to purchase the goods materials and
services needed to operate educational establishments effectively.  During this financial
year, work continued in support of Scottish Government 1140 hours Early Learning and
Childcare initiative, PKC currently has contracts in place with 46 partner providers. 
In 2022/23 the procurement team delivered 297 hours of training to 162 employees; and
received 58 hours of training. 
Prosperous, sustainable and inclusive economy 
Contracts and procurement work by their nature should contribute to the economic health
and socio-economic development of our localities. Throughout the period 2022/23 the
procurement team has supported the development and tendering of contracts to deliver
key infrastructure developments such as: 
• Cross Tay Link Road Project 
The CTLR is the biggest infrastructure project ever undertaken by Perth & Kinross
Council.  It will involve the construction of a new 3-span bridge over the River Tay
and a six kilometre stretch of new carriageway linking the A9 and the A93 to
Blairgowrie and the A94, just north of Scone.  It also includes the construction of two
kilometres of realigned dual carriageway on the A9 just north of the Inveralmond
Roundabout. 
The delivery of the CTLR is integral to the Council’s development planning and
transport strategies; allowing land-locked areas to be freed up for housing and
employment development as well as improving the local transport network and
traffic flow and reducing journey times.  From an active travel perspective, it will
enhance pedestrian and cycle safety and increase network capacity.  It will also
significantly reduce traffic congestion and related pollution in Perth city centre. 
PKC worked extensively with the Contractor throughout the Early Contractor
Involvement phase to develop a detailed design programme. This phase also
involved commencement of site clearance works, including environmental and
ecological seasonal works.
Page 22 of 146

Page 23

Perth and Kinross Council  9 
• Perth People Plan and Perth Transport Futures
The Procurement Team are supporting the delivery of the broad range of Council
Capital projects and programmes to ensure that we have the infrastructure in place
to better serve the people of Perth and Kinross. 
The team has also supported the development and delivery of contracts which are
designed to improve how people experience their local environment.  Examples
include: 
• Primrose Playpark Upgrade
• Provision of Mobile Toilets to Beauty Spots
• Provision of Air Quality Monitoring 
Independent, healthy and active lives 
Health and Social Care – the procurement team support the procurement of a range of
social care and support services from the private and third sector to ensure that people can
live safely and independently in their own homes for as long as possible. 
Several contracts for the delivery of Social Care services for vulnerable individuals were
awarded and implemented during 2022/23. 
Safe and sustainable place for future generations 
Housing – the team have supported Housing Services with their procurement and
contracting activity to make improvements to their housing stock in line with the Strategic
Housing Investment Plan.  Examples of contracts include Housing Term Maintenance,
Environmental Improvements and Ceiling Replacements.  These improvements are
designed to support Council tenants to reduce their energy consumption and, in turn,
reduce costs in line with Council’s priority objective to help tackle poverty across the area. 
6. Delivering Best Value 
Savings 
During the reporting period we continued to see significant price increases across all
categories.  The utilisation of collaborative arrangements with Scottish Procurement,
Scotland Excel and other contracting authorities mitigated against some of this. 
Page 23 of 146

Page 24

Perth and Kinross Council  10 
The estimated savings reported by Scotland Excel for framework agreements used by Perth
& Kinross Council for 2022/23 was circa £200,000. 
Rebates from spend with Scotland Excel framework suppliers and the use of Scottish
Procurement Alliance (SPA) frameworks were accumulated to the value of circa £28,000. 
The use of collaborative arrangements also delivers significant non-cashable benefits in
terms of time and staff resources from the Council not having to carry out their own
tendering activity for these requirements. 
Community Benefits in Procurement 
Community Benefit clauses contribute to the delivery of the sustainable procurement
objectives as set out in our Procurement Strategy. 
The Council has committed to work with local communities and businesses to create a
positive social impact from its contracted spend.  As part of its Sustainable Procurement
Policy, the Council asks suppliers to work in partnership to support local communities in a
real and sustainable way. 
During this reporting period, 42 community benefits have been delivered.  Some examples
are: 
Contract Community Benefit Delivered
Riverside Primary
School
Moncrieff Community Centre was the beneficiary of the
Helping Hands project.  A new kitchen was installed along
with and kitchen appliances (dishwasher oven, hob and
microwave).  The main hall, kitchen, small hall and entrance
were fully painted and new LED lights fitted to kitchen, main
hall, small hall and entrance. 
Planned Preventative &
Reactive Maintenance to
Public Buildings 
£250 donation to Perth Foodbank. 
Presentation to raise awareness in electrical engineering
and to promote careers in the profession delivered to
Kinross High School.  Materials donated for the class to
create a circuit board. 
New apprenticeship placement created.  Employment
commenced 30th May 2022. 
Work experience placements for three pupils from Perth
Grammar School, Perth Academy and Kinross High
School. 
Donation of hoodies to Blairgowrie, Rattray and District Pipe
Band. 
Page 24 of 146

Page 25

Perth and Kinross Council  11 
Cross Tay Link Road,
Perth (Early Contractor
Involvement, detailed
design and construction) 
Donation of defibrillator to Luncarty/Regorton/Moneydie
community area. 
Andy's Mans Cub visited the CTLR sites.  Three sessions
were delivered over two days and involved around 80 staff. 
This has resulted in a fund raiser for the charity. 
Path clearance works at Aberfeldy and Redgorton. 
100 tonnes of stone donated at the request of the
Killiecrankie, Fincastle and Tummel Community
Council. Used to create 43 parking spaces across 30
locations on Foss Road, and to improve the access road to
the Loch Tummel Sailing Club. 
Worked with pupils from Blairgowrie High School on ICE
Bridge Building – see how they got on in this video. 
Donation of materials to PKAVS Mental Health and
Wellbeing Hub 
To see more Community Benefits already delivered in Perth and Kinross visit the map of
community benefits delivered on the PKC website. 
We have also continued to engage and share our Community Benefits Wish List approach
across the wider public sector, including Falkirk Council, Highland Council, Scotland Excel,
North Ayrshire Council, Public Health Scotland, Dumfries & Galloway Council and Scottish
Borders Council. 
Fair Working Practices 
The Council is proud to be an accredited Living Wage employer since April 2016.  As part
of this accreditation, we made the commitment to develop our understanding of Fair Work
practices, including payment of the Living Wage in our supply chain.  We include questions
on the approach to Fair Work when engaging with prospective suppliers for services. 
Where new contracts are formed, bidders are required to provide information on their
approach to Fair Work and the payment of the Living Wage. 
To ensure the highest standards of service quality in our contracts, we expect suppliers to
commit to progressing towards adopting the seven Fair Work First criterion implemented
by the Scottish Government in 2021.  These are reflected in our contract strategies and
tender documents for all regulated procurements. 
Page 25 of 146

Page 26

Perth and Kinross Council  12 
Electronic Tools and Process Efficiency 
There is a national requirement to undertake all procurement communications with
suppliers digitally.  This reduces the cost of doing business for suppliers as well as for the
Council, it also helps shorten payment windows and improve efficiency in managing
performance.  
All competitive activities use the national portal Public Contracts Scotland with the intention
that potential suppliers are able to identify contracting opportunities in a single location.  The
use of electronic systems and digital tools to support and manage the procurement work is
a source of further efficiency.  Tenders are issued through an electronic platform (PCS-
Tender) and all of the tenders issued are managed electronically. 
We offer e-invoicing and procurement card payment options to suppliers who wish to adopt
these methods. 
Collaborative Contracts 
During this reporting period, in addition to directly procured contracts issued on behalf of the
Council, we also made use of a range of contractual agreements awarded in collaboration
with other bodies. 
The Council continues to make significant use of collaborative contracts which are broadly
split into the following three categories: 
• those delivered for the whole of the public sector by Scottish Government, Hubco,
Westminster (Crown Commercial Services), and other public sector bodies (Scottish
Procurement Alliance, SCAPE)
• those delivered for the Scottish local authority sector by Scotland Excel
• those delivered primarily for the three Tayside Councils through the Tayside
Procurement Consortium. 
TPC ceased to be resourced from June 2022.  This has resulted in a reduction of Tayside
wide collaborative contracts year on year, with five awarded in 2022/23.  It has also meant
that we are unable to report on our spend channelled through these contracts due to no
management information being collated. The Council does not have systems to allow us to
analyse spend by contract. 
Other collaborative spend includes: 
Scottish Government £11,166,844
Scotland Excel  £12,057,676
Hubco  £35,122,230
Scottish Procurement Alliance £6,050,653
Procurement For Housing    £796,450 
Value from these collaborative arrangements is promoted through access to the enhanced
buying power of working together with other Councils, either locally or nationally.  Robust
benchmarking of prices and costs is undertaken using data on market rates, comparable
projects and internal information on performance. 
Page 26 of 146

Page 27

Perth and Kinross Council  13 
7. Reporting, Review and Benchmarking Performance     
Reporting 
Ensuring that procurement performance is reported regularly to an appropriate committee
was highlighted as an essential requirement in the Accounts Commission Report on
Procurement in Councils.  The preparation of this Annual Report together with the reporting
of procurement activity through service and financial monitoring reports is intended to meet
this requirement. 
Review & Benchmarking
In alternate years, an independent review of the procurement capability takes place.  The
Council’s procurement functions are benchmarked against an assessment tool - the
Procurement Capability and Improvement Programme (PCIP).  The assessment requires
the submission of defined range of data and documentation as well as an on-site visit by
the assessors.  The PCIP focuses on the policies and procedures driving procurement
performance and more importantly, the results they deliver. The PCIP focusses on four
main elements: 
• Leadership and Governance
• Development and Tender
• Contract Management
• Purchasing Processes  
There has been no PCIP assessment since 2018 due to the COVID pandemic. 
During the reporting period, the Procurement Team have experienced significant resource
pressures.  Accordingly, officers have had to prioritise ensuring legal compliance and risk
management to the detriment of desired improvement activity.  This is a recognised issue
and measures are in hand both to provide additional internal support to the Corporate
Procurement Team and to facilitate the delivery of the Strategic Commissioning and
Procurement Consolidation Review. 
8. Strategy Ownership and Contact details   
The Council’s Corporate Procurement Team is part of the Council’s Legal & Governance
Division in Corporate & Democratic Services, and reports to the Head of Legal &
Governance. 
.  
Contact details
Perth & Kinross Council 
2 High Street 
Perth 
PH1 5PH contracts@pkc.gov.uk 
Page 27 of 146

Page 28

Appendix A - Key Statistics 2022-23
Page 28 of 146

Page 29

Appendix B – Tenders Accepted & Following the Public Pound Report 
TENDERS ACCEPTED 
1 April 2022 to 31 March 2023 
The Council Scheme of Administration sets out the arrangement for the management
of the procurement function. 
The information provided below sets out for the committee all the tenders accepted
on behalf on the Council during the financial year 2022/23. 
Contact information is given in each section of this report; queries in respect of
specific tendering activities should be raised with the named officers directly. 
Please note where a contract value is a negative value, this is an income generating
contract and there is no cost to PKC in the delivery of this contract.    
Page 29 of 146

Page 30

Perth and Kinross Council  16 
Tenders Accepted by Council Services 
(To 31 March 2023) 
Corporate and Democratic Services
Tenders for goods, supplies and services or works where the higher value regulated procurement threshold
(The Public Contracts (Scotland) Regulations 2015) has been applied
Title Value (£) Start End Incl.
Extension
Planned Preventative and Reactive
Maintenance of Manually Operated and
Electrical Roller Shutter Doors withing Public
Buildings
322,000 18/07/2022 18/07/2025 18/07/2029
Mechanical and Electrical Projects to Public
Buildings 2022
14,000,00
0
27/01/2023 27/01/2026 27/01/2030
Minor Construction Projects as Multi Trade
(Main) Contractors to Various Public Buildings
4,000,000 13/01/2023 13/01/2026 13/01/2027  
Tenders above £50k and below the higher value regulated procurement threshold, where the Procurement
Reform (Scotland) Act 2014 has been applied
Title Value (£) Start End Incl.
Extension
Modernisation of Lift Installations  246,995 28/03/2023 10/10/2023 
Three Competitive Quotes / Quick Quote
Title Value (£) Start End Incl.
Extension
VAT Advice for PH20 5,625 01/08/2022 31/07/2028 
DCDA Contract for Perth & Kinross Council 59,413 01/09/2022 01/09/2026 
Servicing and Maintenance of the Local exhaust
ventilation and Fume cupboards
25,960 01/04/2023 01/04/2025 
IoT Roadmap Development 15.000 27/06/2022 30/09/2022 
Transparency Notices
Title Value (£) Start End Incl.
Extension
webCAPTURE Revenue Forms and Processing 139,977 01/08/2022 01/08/2024 01/08/2026
Perth Grammar School Structural Remedial
Works
125,205 19/09/2022 19/11/2022  
Perth Academy Phase 3 1,363,858 13/06/2022 13/06/2023  
Demolition of Former Travis Perkins Industrial
Site, Perth
88,294 17/10/2022 31/03/2023  
Service Desk Maintenance 134,278 01/04/2023 31/03/2026 31/03/2027
Maintenance of Gazetteer Management
Solutions
10,228 01/04/2023 31/03/2024  
Support & Licences for Call Recording Solution 4,911 01/04/2023 31/03/2024  
Supply of Network Backup Solution 54,250 27/09/2022 24/03/2023 24/03/2025
AV Support for Council Chambers 11,135 14/02/2023 31/03/2024  
Support & Maintenance for FME 4,680 01/04/2023 31/03/2026  
Perth Grammar School 8nr Classroom
Upgrades
213,028 13/06/2022 13/08/2022  
Phishing Simulation and Security Awareness
Training Solution
90,000 30/11/2022 30/11/2024 30/11/2025
Page 30 of 146

Page 31

Perth and Kinross Council  17 
Provision of Performance and Risk Management
Software
104,000 02/05/2022 02/05/2024 02/05/2026
BACS Software 13,700 27/05/2022 27/05/2024 27/05/2025
IoT Social Housing (Temperature & Relative
Humidity and CO2)
250,000 12/12/2022 12/12/2023 12/12/2026
Website Content Management System 179,700 1/10/2022 30/09/2025 30/09/2027
Provision of SAN Support & Maintenance
Services
115,200 31/03/2022 30/03/2026  
Mobile Device Management Software 27,409 08/12/2022 07/12/2023  
Supply of Guest Internet Connection 20,700 27/02/2023 27/02/2028  
Out of Warranty Server Support 9,642 01/04/2022 31/03/2023  
Provision of anti-virus solution licences 23,044 01/04/2023 31/03/2024  
Secure Email Gateway (Clearswift) 34,742 07/11/2022 06/11/2023  
Executive Research Services 77,400 25/11/2022 30/11/2024  
Provision of PSN Connect Circuit 10,362 20/01/2023 19/01/2026  
Wi-Fi Network Planning & Management Toolkit 2,775 02/03/2023 01/03/2024  
Secure mail data transfer solution (Egress) 5,359 22/3/2023 21/03/2024  
Out of Warranty Server Support 28,500 01/04/2023 31/03/2024 31/03/2027
Provision of Citrix Cloud Consultancy 9,920 07/11/2022 06/11/2023  
Open Data Platform 10,800 01/10/2022 30/09/2023  
Tenable IO Vulnerability Management Licence 8,411 22/02/2023 21/02/2026  
Supply of 2 Servers 5,765 15/12/2022 22/12/2029  
Supply of 3 Servers (AoVPN) 9,473 20/12/2022 16/01/2030  
Supply of 2 Servers and storage (LAL) 23,671 13/01/2023 08/02/2030  
Citrix Estate Licence Subscriptions (VA/VD) 14,363 06/04/2023 05/04/2024  
Supply of Network Backup Cloud solution 167,772 25/03/2023 24/03/2024 24/03/2026
Health Checks for PSN Annual Accreditation 35,700 01/04/2022 31/03/2024 31/03/2025
Supply of Network Equipment compatible with
PKC Estate
61,836 25/03/2022 26/03/2026  
Supply of Network Equipment compatible with
PKC Estate
361,926 01/06/2022 31/05/2023  
Supply of Network Equipment compatible with
PKC Estate
272,672 30/06/2022 30/06/2025  
Supply of 8 servers  73,637 17/08/2022 14/09/2029  
Renewal of Arcserve on-premise licences,
support & maintenance
45,883 25/03/2023 24/03/2024 24/04/2026
Call Recording Quality Monitoring 7,344 01/12/2022 01/04/2024 
Telephony Call Management System Support
Services
4,122 12/04/2023 11/04/2024 
Location Centre Subscription 22,500 01/11/2022 31/10/2023 
Fraud Prevention Process 51,543 17/01/2023 16/01/2026 
For further information contact: Lynn Law lynnlaw@pkc.gov.uk 01738 475550  
Page 31 of 146

Page 32

Perth and Kinross Council  18 
Education and Children's Services
Tenders for goods, supplies and services or works where the higher value regulated procurement threshold
(The Public Contracts (Scotland) Regulations 2015) has been applied
Title Value (£) Start End Incl.
Extension
Crisis Support Services for children and young
people within Perth and Kinross
250,000 13/12/2022 12/12/2023  
Independent Advocacy Services for Children
and Young People in Perth and Kinross.
300,000 02/08/2022 02/08/2024 02/08/2026  
Tenders above £50k and below the higher value regulated procurement threshold, where the Procurement
Reform (Scotland) Act 2014 has been applied
Title Value (£) Start End Incl.
Extension
No tenders of this type were accepted by Education and Children’s Services during this period  
Three Competitive Quotes / Quick Quote
Title Value (£) Start End Incl.
Extension
Maintenance of Mobile Combined Table Units
with Fixed Stools within schools across Perth
and Kinross
16,039 26/01/2023 25/01/2025 
Whole Family Wellbeing Programme – Support
for whole system transformation
41,500 13/03/2023 12/03/2024 
Delivery of Communication and language
through Outdoor Learning Training
5,850 07/08/2023 30/11/2023 
Transparency Notices 
Title Value (£) Start End Incl.
Extension
Food Waste Bin Cleaning across Perth and
Kinross
20,064 01/12/2022 30/11/2025 
Removal Services at North Muirton Primary
Schools and Balhousie Primary School
39,693 15/03/2023 30/06/2023 
For further information contact: Andy Cook acook@pkc.gov.uk 01738 476330 
Page 32 of 146

Page 33

Perth and Kinross Council  19 
Health and Social Care Partnership
Tenders for goods, supplies and services or works where the higher value regulated procurement threshold
(The Public Contracts (Scotland) Regulations 2015) has been applied
Title Value (£) Start End Incl.
Extension
No tenders of this type were accepted by Health and Social Care Partnership during this period  
Tenders above £50k and below the higher value regulated procurement threshold, where the Procurement
Reform (Scotland) Act 2014 has been applied
Title Value (£) Start End Incl.
Extension
No tenders of this type were accepted by Health and Social Care Partnership during this period     
Light Touch Regime
Title Value (£) Start End Incl.
Extension
Social Care and Housing Support for adults with
severe and enduring mental health and common
co-morbidities
1,911,626 03/04/2023 03/04/2026 03/04/2028     
Three Competitive Quotes / Quick Quote
Title Value (£) Start End Incl.
Extension
No tenders of this type were accepted by Health and Social Care Partnership during this period  
Transparency Notices 
Title Value (£) Start End Incl.
Extension
Social Care System Support Services 250,000 25/11/2022 25/11/2024 
Volunteer Management Solution 38,570 20/06/2022 19/06/2023 19/06/2024
Overnight Responder Service 10,872 01/10/2022 30/09/2025 
Social Care Support 2,224,320 01/04/2023 31/03/2026 31/03/2028
Social Care Support 2,237,060 01/04/2023 31/03/2026 31/03/2028
Social Care Support 1,634,746 01/04/2023 31/03/2026 31/03/2028 
For further information contact: Amanda McKinnie  AMcKinnie@pkc.gov.uk  01738 476789 
Page 33 of 146

Page 34

Perth and Kinross Council  20 
Communities
Tenders for goods, supplies and services or works where the higher value regulated procurement threshold
(The Public Contracts (Scotland) Regulations 2015) has been applied
Title Value (£) Start End Incl.
Extension
Tree and Woodland Maintenance 711,000 20/12/2022 19/12/2025 19/12/2027
Play Area Inspection and Maintenance 1,204,859 19/12/2022 19/12/2024 19/12/2026
Print, Distribution and Managed Service of
Garden Waste Permits
192,400 05/12/2022 05/03/2025 05/03/2028
Cross Tay Link Road, Perth 11,169,000 16/09/2022 13/05/2025  
Visitor & Residents Experience, Rural and
Remote Locations - CivTech 6 - Challenge 8
650,000 25/02/2022 25/02/2024 25/05/2025
Housing Term Maintenance 2022 - 2025 1,378,988 02/05/2022 02/05/2025 02/05/2026
Supply & Installation of Vehicle Activated
Signs in Perth & Kinross Council Area
193,850 22/02/2023 22/03/2024 
Tenders above £50k and below the higher value regulated procurement threshold, where the Procurement
Reform (Scotland) Act 2014 has been applied
Title Value (£) Start End Incl.
Extension
Bishops Bridge A822-05 Phase 2
Strengthening Works
59,356 12/09/2022 12/11/2022 12/12/2022
Dalnacardoch Bridge C454-04 Repair Works 251,625 24/03/2023 24/08/2023 24/09/2023
Rumbling Bridge, Dunkeld U159-01 Repair
Works
61,771 01/04/2022 01/06/2022 01/07/2022
Masonry Repair Pack 54,300 10/02/2023 10/04/2023 10/04/2024
A93/12 Blairgowrie Weir Scour Repairs 158,819 12/08/2022 16/10/2022 16/11/2022
A93/21 C05 Dalhenzean, C429/00 C05
Dunkeld Golf Course & C414/04 C05
Culteuchar Culvert
97,166 19/12/2022 19/04/2023 19/04/2024
Accelerator Programme 78,000 11/10/2022 08/06/2023  
Environmental Improvements Contract Phase
2 #2
1,039,433 01/06/2022 01/06/2025 01/06/2026  
Three Competitive Quotes / Quick Quote 
Title Value (£) Start End Incl.
Extension
Perth and Kinross Local Employability
Partnership Employability Strategy
22,850 09/01/2023 31/03/2023  
Static Hot/Cold Pressure Washers 10,353 02/12/2022 01/12/2023  
Supply of Single Axle Towing Dolly 26,100 26/01/2023 26/01/2023  
Workshop Vehicle Ramp 15,775 03/02/2023 04/02/2023  
140L Food Waste Bin Housing 27,299 07/09/2022 08/09/2022  
Litter Bin Housing and Fill Level Sensors 45,000 14/03/2023 15/03/2023  
Campervan Waste Disposal Point, Broxden
Park & Ride, Perth
56,143 08/03/2023 08/05/2023  
Processing of Mixed Paper and Card (income) -13,000 23/06/2022 22/10/2022  
Processing of Mixed Paper and Card (income) -4,000 24/10/2022 24/02/2023  
Cycle Parking Hubs - Perth City Centre 13,195 22/02/2023 31/03/2023  
Taxi / PH Contract DBG/004 22,660 06/06/2022 30/06/2023  
Processing of Mixed Paper and Cardboard
(income)
-4,160 24/02/2023 24/06/2023  
Moneydie Roger Culvert U43-01 C05 Repair
Works
19,517 30/09/2022 14/11/2022  
Page 34 of 146

Page 35

Perth and Kinross Council  21 
Internal works to Orchard Place, Perth 14,707 25/04/2022 20/05/2022  
Internal works to Norlands, Errol 12,444 25/04/2022 20/05/2022  
Wallace Park Phase 3 55,584 14/11/2022 28/11/2022  
Coupar Angus Town Centre Action Plan 11,088 28/10/2022 31/12/2022  
Former Travis Perkins Site, Topographical &
GPR Survey
2,790 01/04/2022 02/04/2022  
Specialist support to assess and comment on
planning applications in respect of biodiversity
13,900 23/01/2023 07/04/2023  
Specialist support to carry out a Perth and
Kinross Climate Change Risk and Opportunity
...
48,200 19/09/2022 31/03/2023  
Taxi/PHV Contract BCC/152 5,640 25/04/2022 30/06/2022  
Taxi/PHV Contracts BCC/021, BCC/022,
BCC/023, BCC/024
60,558 17/08/2022 29/06/2023  
Taxi/PHV Contracts BCC/024, BCC/025,
BCC/026
76,380 17/08/2022 29/06/2023  
Taxi/PHV Contracts BCC/025, BCC/027,
BCC/028, BPH/114
51,030 17/08/2022 29/06/2023  
Taxi/PHV Contracts BPH/116 17,100 12/09/2022 29/06/2023  
PSV Contract XCS/028 65,175 20/09/2022 29/06/2023  
Taxi/PHV Contract DPH/023 5,940 19/12/2022 28/07/2023  
Taxi/PHV Contract BCC/029 24,780 12/12/2022 29/06/2023  
Taxi/PHV Contract BPH/117 13,625 09/01/2023 29/06/2023  
Taxi/PHV Contracts BPH/118 13,625 09/01/2023 29/06/2023  
Retail Study 45,154 06/08/2022 16/12/2022  
Improvement works - Sidlaw Gardens, Coupar
Angus
24,205 14/03/2022 28/03/2022  
Improvement of Property - Tay Road, Alyth 25,639 20/06/2022 15/07/2022  
Improvement of Property - Appin Place,
Aberfeldy
29,946 27/06/2022 05/08/2022  
Letham & North Localities - Ceiling
Replacements & Minor Works
20,350 11/07/2022 19/08/2022  
Improvement Works to Kingswell Terrace,
Perth
30,165 21/09/2022 29/11/2022  
Property Refurb Davidson Crescent, Coupar
Angus
22,305 02/12/2022 06/01/2023  
Property Refurbishment Strathtay Road,
Letham
24,045 12/12/2022 13/01/2023  
Property Refurbishment Tulloch Square,
Hillyland
24,840 16/01/2023 17/02/2023  
McRosty Park - Edging Repairs 6,700 01/03/2023 31/03/2023  
Refugee Resettlement – Community
Integration Support
21,510 12/10/2022 31/03/2023  
PSV Contract YPH/002 7,600 17/08/2022 07/10/2022  
Taxi/Private PHV BFP/007 19,500 05/09/2022 30/07/2023  
Taxi/PHV Contract DAD/005 7,250 29/08/2022 30/07/2023  
Taxi/PHV Contract AST/007 10,400 24/10/2022 30/06/2023  
Property Repairs Abercairney Place Blackford 18,570 14/11/2022 16/12/2022  
Internal works to Crammond Place, Perth 54,095 16/03/2022 11/07/2022  
Internal works to Potterhill Gardens, Perth 35,728 11/07/2022 12/10/2022  
Internal works to Glengarry Road, Perth 23,630 11/07/2022 02/02/2023  
City & South Localities - Ceiling Replacements
& Other Minor Works
46,064 11/07/2022 31/03/2023  
Internal works to Argyll Road, Perth 26,629 11/07/2022 12/08/2022  
Page 35 of 146

Page 36

Perth and Kinross Council  22 
Internal works to Bute Drive, Perth 37,455 03/08/2022 14/10/2022  
Works to Brora Court, Perth 27,966 11/07/2022 23/09/2022  
Internal refurbishment of Monteath Street,
Crieff
16,480 15/08/2022 10/11/2022  
Improvement Works to Green Park, Kinross 22,070 17/08/2022 13/10/2022  
Improvement Works to Bowton Road, Kinross 21,806 15/08/2022 13/10/2022  
Improvement Works to Corlundy Crescent,
Crieff
22,354 12/08/2022 10/11/2022  
Improvement Works to Victoria Street, Perth 13,157 05/10/2022 14/11/2022  
Woks to Various Properties in Perth City
Locality
139,444 20/03/2023 02/06/2023  
Works to Various Properties in the South
Locality Area
128,708 28/03/2023 13/06/2023  
Internal refurbishment - Jeanfield Road, Perth 13,235 02/05/2022 29/07/2022  
Internal Works to Gowans Terrace, Perth 22,336 01/06/2022 22/06/2022  
Supply of 5 x Pedestrian Mowers 37,500 07/02/2023 07/02/2023  
Supply of 5 x Ride on Mowers with Cut &
Collect Attachment
50,673 10/04/2023 10/04/2023  
Outsource Sales Representative 15,000 01/07/2022 30/06/2023  
Revised Strategic Tourism Infrastructure
Development Plan
10,000 01/08/2022 30/10/2022       
Transparency Notices 
Title Value (£) Start End Incl.
Extension
Processing of Glass 333,000 02/05/2022 02/11/2023 02/11/2024
Processing of Timber 48,000 01/04/2022 01/04/2024 01/04/2026
Treatment of Organic Waste- Co-mingled Food
and Garden Waste
3,000,000 01/04/2022 01/04/2024 01/04/2025
Treatment of Organic Waste- Garden Waste 530,000 01/04/2022 01/04/2024 01/04/2025
AutoDESK Software Renewal 11,215 10/03/2023 10/03/2024  
AutoDESK Software Renewal 66,701 28/10/2022 28/10/2025  
ECO Stars Technical Management Support 11,438 15/06/2022 31/03/2023  
Provision of Air Quality Monitoring 94,650 01/04/2022 01/04/2023  
Perth AQMA Regional Model Refinement 10,000 16/08/2022 31/10/2022  
Clean Air Day 2022 13,155 16/08/2022 30/06/2023  
Domestic Gas Boiler Maintenance 3,068,060 01/06/2022 01/06/2025 01/06/2026
Taxi Contract BPY/001 21,465 17/11/2022 29/06/2023  
Taxi Contract AKS/010 10,080 13/02/2023 29/06/2023  
Perth Christmas Light Switch on Acts and
Performances
25,050 18/11/2022 18/12/2022  
A93/14 Bridge of Cally Parapet Repair Works 101,216 05/07/2022 11/11/2022 11/12/2022
Transport Contracts operated by Taxis and
Private Hire Vehicles (Q2 2022)
15,216 19/04/2022 19/06/2023 19/06/2026
Transport Contracts operated by Taxis and
Private Hire Vehicles (Q3 2022)
299,548 17/08/2022 17/07/2023 17/07/2026
Taxi/PHV Contract BPH/115 19,005 29/08/2022 29/06/2023  
Taxi Contract BFP/008 10,220 24/10/2022 02/06/2023  
Perth People Place and Perth Transport
Futures
594,300 25/04/2022 25/01/2025  
Dismantling & Removal of Structures 5,151 01/09/2022 01/11/2022 01/12/2022
Phase 2 Study - Ground Investigation 11,450 06/02/2023 10/03/2023  
Page 36 of 146

Page 37

Perth and Kinross Council  23 
Cross Tay Link Road, Perth Project Manager's
Representative Scope of Works
170,000 23/08/2022 23/08/2025 23/08/2026
Digital Skills Programme 45,000 30/01/2023 31/03/2023  
Replacement of Windows and Doors 2,500,000 04/01/2023 04/01/2024  
Internal Wall Insulations 1,893,462 03/10/2022 31/03/2023  
John Deere 2026R 20,900 05/10/2022 08/10/2022  
Brushcutters 1,498 23/09/2022 24/09/2022  
Skips 27,680 06/06/2022 06/06/2022  
Supply of Box Trailer 6,695 07/10/2022 07/10/2022  
Front Loader RCV 260,826 16/10/2023 15/10/2027  
Heavy Vehicles 258,880 12/01/2024 11/01/2027  
Supply of Three Tippers 216,180 12/01/2024 11/01/2027  
Perth and Kinross Waste Compositional
Analysis
12,753 09/05/2022 31/05/2022  
Provision of Mobile Toilets to Beauty Spots 34,000 09/05/2022 30/10/2022  
A827 Bolfracks wall repair 85,446 11/11/2022 01/09/2023  
Scour Assessments Pack S1 238,185 30/01/2023 30/06/2023  
Comrie FPS - Enabling Works 1,073,791 10/06/2022 30/06/2023  
Digital Inclusion Support for Council Tenants 50,000 01/06/2022 31/03/2023  
Perth Data Collection 55,263 17/10/2022 31/12/2022  
Perth Traffic Model Development 64,967 05/12/2022 31/03/2023  
Amenity Greenspace Primrose Park
Auchterarder Pl.
265,108 23/08/2022 31/03/2023  
Tayforth RAUC Area – national Coring 2022 111,000 28/11/2022 31/03/2023  
Cores & Dynamic Cone Penetrometer Testing
& Hazard Classification of Waste
60,092 16/05/2022 12/08/2022  
Blairgowrie & Rattray Surface Water
Management Plan
75,278 10/10/2022 24/11/2023  
Supply of One Lease Car 11,232 11/04/2022 10/04/2025  
Supply of One Lease Car 8,896 01/09/2022 31/08/2025  
Supply of One Lease Car 11,366 21/04/2023 20/04/2026  
7083/KNC Metalwork Amenity Greenspace 17,260 19/09/2022 15/10/2022  
Sporadic Patching 2021-2022 391,945 26/07/2021 31/03/2022   
For further information contact: Shona Welsh swelsh@pkc.gov.uk 01738 476417 
Page 37 of 146

Page 38

Perth and Kinross Council  24 
Tenders Accepted by Tayside Procurement Consortium
(To 31 March 2023) 
The Tayside Procurement Consortium was formerly the Council’s local shared procurement
function to tender packages on behalf of Perth & Kinross Council, Angus Council, Dundee
City Council, and Tayside Contracts.  The Chief Executives of the three Tayside Councils
have now agreed to integrate collaborative procurement activity as part of the remit of each
Council’s procurement team. 
Note to the tables:
‘n/a’ is used, where the anticipated spend is as yet unknown.  The award is for a
Framework Agreement, the use of which will be dependent on requirements in any given
year. 
Title Value (£) Start End Incl.
Extension
Flexible Framework Refresh –
Counselling in Schools
n/a 01/06/2022 01/10/2023 01/10/2024
Bureau Service – Winter Forecasting n/a 30/09/2022 30/09/2027 n/a
Online School Payments System n/a 01/06/2022 01/07/2025 01/07/2028
Supply, Installation, Equipment, and
Maintenance of Wireless WAN
Infrastructure
n/a 01/04/2022 01/04/2025 01/04/2027
Maintenance of Sports Equipment n/a 25/04/2022 25/04/2025 25/04/2027 
For further information contact: Lisa Simpson     lsimpson@pkc.gov.uk 
Page 38 of 146

Page 39

Perth and Kinross Council  25 
FOLLOWING THE PUBLIC POUND
1 April 2022 to 31 March 2023 
‘Following the Public Pound’ means ensuring that there is proper accountability for
public funds used in delivering services and providing social benefits, irrespective of
the means of delivering them.  Each Director of Council Services is responsible for
ensuring that there is clear public accountability for public funds which are provided
from their budgets to outside organisations. 
In common with other local authorities, the Council works with a number of external
organisations to assist in the provision of its services. These external organisations
include public, private and voluntary sector providers. 
The Council has a local Code of Guidance based on the Code of Guidance on
Funding External Bodies and Following the Public Pound issued by the Accounts
Commission in co-operation with COSLA. 
Queries in respect of specific activities should be raised via contracts@pkc.gov.uk 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
3rd Perthshire
Scouts
Community
Investment Fund -
Ward 2 
4,500   4,500
Aberfeldy Church Of
Scotland
Food Security Fund  3,000   3,000
Aberfeldy
Development Trust
Community
Investment Fund -
Ward 4 
2,704   2,704
Aberfeldy Tennis
Club
Community
Investment Fund -
Ward 4 
170   170
Aberlour Child Care
Trust
SLA 2022/23   204,589  204,589
Aberlour Sustain Cost of Living
Community Fund 
1,443   1,443
Abernethy 66th
Perthshire Scout
Group
Community
Investment Fund -
Ward 9 
12,117   12,117 
Cost of Living
Community Fund 
500   500
Abernethy in Bloom Abernethy in Bloom  750   750
Abernethy Keep
Active Club
Almond & Earn LAP  500   500
Abernethy Pavilion -
66th Scout Group
Administration Grant  250   250
Aberuthven Cost of Living
Community Fund 
1,000   1,000
Aberuthven &
Dunning Church
Cost of Living
Community Fund 
1,500   1,500
Aberuthven Village
Hall Trust
Community
Investment Fund -
Ward 7 
3,920   3,920 
Cost of Living
Community Fund 
2,774   2,774 
Administration Grant  250   250
Acorn Forest Activity
Club
Food Security Fund  2,865   2,865
Page 39 of 146

Page 40

Perth and Kinross Council  26 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Adventure Circus
SCIO
Cost of Living
Community Fund 
1,200   1,200 
Volunteer
Development Fund 
1,537   1,537
All Strong Scotland
CIC
Cost of Living
Community Fund 
500   500 
Volunteer
Development Fund 
900   900
Almondbank Church
Youth Group
Community
Investment Fund -
Ward 5 
500   500
Alyth Development
Trust TFL Group
Volunteer
Development Fund 
2,868   2,868
Alyth Senior Citizen
Group
Food Security Fund  1,416   1,416
Alyth Senior
Citizens Lunch &
Socialising Club
Cost of Living
Community Fund 
5,224   5,224
Alyth Youth
Partnership
Cost of Living
Community Fund 
7,410   7,410 
Food Security Fund  240   240
Amulree Village Hall
Trust Fund
Community
Investment Fund -
Ward 5 
10,509   10,509 
Cost of Living
Community Fund 
204   204 
Digital Inclusion Fund  400   400 
Strathtay LAP  3,000   3,000 
Administration Grant  250   250
Anchor House Housing Support
Payment 
136,597   136,597
Anchor House / The
Neuk
Community
Investment Fund -
Perth City 
14,000   14,000
Angus Council Tayside Biodiversity
central reserve 
20,000   20,000
Ardoch in Bloom Cock & Hen Wall
Restoration 
4,711   4,711
Ardoch Parish
Church
Cost of Living
Community Fund 
2,660   2,660
Ark Housing
Association
(Blairgowrie)
Housing Support
Payment 
281,265   281,265
Ark Housing
Association (Perth)
Housing Support
Payment 
82,552   82,552
Ark Housing
Association Ltd
Void rent  2,215   2,215
Arngask Hall Cost of Living
Community Fund 
2,500   2,500
Atholl Baptist Centre Community
Investment Fund -
Ward 4 
6,368   6,368 
Cost of Living
Community Fund 
1,500   1,500 
Food Security Fund  20,820   20,820
Auchterarder
Bowling Club
Cost of Living
Community Fund 
2,500   2,500
Auchterarder
Community Sports
& Recreation
Cost of Living
Community Fund 
7,253   7,253 
Path Grant 2022/23  10,000   10,000
Page 40 of 146

Page 41

Perth and Kinross Council  27 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total 
Administration Grant  150   150
Auchterarder Parish
Church
Food Security Fund  1,000   1,000
Ballintuim Village
Hall
Administration Grant  250   250
Bankfoot Foodstore
Pantry
Cost of Living
Community Fund 
525   525
Barnardo's SLA 2022/23   113,100  113,100
Barnardo's Scotland SLA 2022/23   21,000  21,000
Beautiful Perth Jubilee celebrations  750   750
Birnam Arts Cost of Living
Community Fund 
12,548   12,548
Blackford Parish
Church
Cost of Living
Community Fund 
1,025   1,025
Blackwater Public
Hall
Administration Grant  250   250
Blair & Rattray
Development Trust
Ltd
Cost of Living
Community Fund 
2,130   2,130
Blair Atholl Payment towards
Regrade 
10,000   10,000
Blair Atholl Village
Hall
Administration Grant  250   250
Blair in Bloom Blair in Bloom  750   750
Blairgowrie  Volunteer
Development Fund 
770   770
Blairgowrie &
District Next Steps
Volunteer
Development Fund 
1,500   1,500
Blairgowrie &
District Senior
Outings
Community
Investment Fund -
Ward 3 
2,000   2,000
Blairgowrie & East
Perthshire Next
Steps
Volunteer
Development Fund 
75   75
Blairgowrie &
Rattray Access
Network
Administration Grant  150   150
Blairgowrie &
Rattray Community
Football Club
Community
Investment Fund -
Ward 3 
5,000   5,000 
Cost of Living
Community Fund 
383   383 
Food Security Fund  960   960 
Volunteer
Development Fund 
770   770
Blairgowrie &
Rattray
Development Trust
Community
Investment Fund -
Ward 3 
2,317   2,317 
Cost of Living
Community Fund 
1,170   1,170 
Food Security Fund  761   761
Blairgowrie Players Cost of Living
Community Fund 
2,000   2,000
Blairgowrie Runners Volunteer
Development Fund 
760   760
Blairgowrie Ukelele
Group
Volunteer
Development Fund 
150   150
Booklore Cost of Living
Community Fund 
298   298
Page 41 of 146

Page 42

Perth and Kinross Council  28 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Breadalbane Canoe
Club
Volunteer
Development Fund 
1,485   1,485
Breadalbane Mens
Shed
Community
Investment Fund -
Ward 4 
4,680   4,680
Breathe Easy
Perthshire
Volunteer
Development Fund 
565   565
Breathe Easy
Project
Cost of Living
Community Fund 
6,340   6,340
Breathe Project
(Aberfeldy Parish
Church)
Community
Investment Fund -
Ward 4 
2,850   2,850
Bridge of Cally
Village Hall
Cost of Living
Community Fund 
4,092   4,092
Bridge of Earn AFC Volunteer
Development Fund 
180   180
Bridge of Earn
Institute
Digital Inclusion Fund  630   630 
Administration Grant  250   250
Bridgend, Gannochy
& Kinnoull
Community Council
Cost of Living
Community Fund 
2,500   2,500
Bridgeton United
Amateur Football
Club
Community
Investment Fund -
Ward 5 
7,750   7,750
Broke Not Broken Community
Investment Fund -
Ward 8 
15,013   15,013 
Cost of Living
Community Fund 
6,500   6,500 
Food Security Fund  42,855   42,855
Burrelton
Community Hub
Cost of Living
Community Fund 
1,000   1,000 
Digital Inclusion Fund  2,000   2,000 
Food Security Fund  1,000   1,000
Buttons and Bows
Baby Bank
Community
Investment Fund -
Perth City 
4,000   4,000 
Cost of Living
Community Fund 
1,800   1,800 
Volunteer
Development Fund 
1,918   1,918
Caledonia Housing
Association
Housing Support
Payment 
126,994   126,994 
Burnside Court  7,139   7,139 
Muirmont Place  8,892   8,892 
South William Street  16,362   16,362 
Muirton Place  588   588
Calm Training
Services Ltd
Training   9,790  9,790
Cambo Heritage
Trust
Snowdrops  1,335   1,335
Camserney Hall
Committee
Cost of Living
Community Fund 
1,000   1,000 
Administration Grant  250   250
Caputh Village Hall
Committee
Community
Investment Fund -
Ward 5 
3,660   3,660 
Digital Inclusion Fund  900   900 
Strathtay LAP  35   35
Page 42 of 146

Page 43

Perth and Kinross Council  29 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total 
Administration Grant  250   250
Cargill & Burrelton
Community Hub
Community
Investment Fund -
Ward 2 
1,591   1,591
Carnbo & District
Community Hall
Cost of Living
Community Fund 
330   330
Carnbo Village Hall Administration Grant  250   250
Cascade Institute
Community Drop In
Cost of Living
Community Fund 
1,716   1,716
Centre For Inclusive
Living P & K
FAP 2022/23    44,169 44,169
Centrum
Edukacyjne Bajka
Cost of Living
Community Fund 
6,000   6,000
Chapelhill Hall
Community
Association
Community
Investment Fund -
Ward 5 
1,956   1,956 
Administration Grant  250   250
CHAS SLA 2022-23   18,780  18,780
Checkin Cost of Living
Community Fund 
10,000   10,000 
Food Security Fund  30,000   30,000 
SLA 2022/23    30,051 30,051
Churches Action For
The Homeless
Cost of Living
Community Fund 
15,358   15,358 
SLA 2022/23  260,876   260,876 
Housing Support
Payment 
531,584   531,584
Cleish Village Hall
Association
Community
Investment Fund -
Ward 8 
2,860   2,860 
Administration Grant  250   250
Clunie Hall
Association
Cost of Living
Community Fund 
500   500 
Administration Grant  250   250
Community
Connectors
Digital Inclusion Fund  2,807   2,807
Comrie & District
Community Shed
Cost of Living
Community Fund 
3,840   3,840
Comrie Community
Centre
Administration Grant  250   250
Comrie Millennium
Footpath
Association
Grant  150   150
Comrie Rural Hall Administration Grant  250   250
Coupar Angus Pride
of Place
Jubilee grant  750   750
Coupar Angus
Youth Activities
Group
Community
Investment Fund -
Ward 2 
2,556   2,556 
Food Security Fund  3,000   3,000
Craigie & Moncreiffe
Messy Church
Cost of Living
Community Fund 
500   500
Crieff Baptist
Church
Cost of Living
Community Fund 
250   250
Crieff Community
Council
Grant  10,000   10,000
Crieff Community
Trust
Administration Grant  150   150
Page 43 of 146

Page 44

Perth and Kinross Council  30 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Crieff Connexions Community
Investment Fund -
Ward 6 
3,365   3,365 
Cost of Living
Community Fund 
1,920   1,920 
Food Security Fund  5,100   5,100
Crook of Devon
Village Hall
Community
Investment Fund -
Ward 8 
1,228   1,228
Crossreach SLA 2022/23    66,488 66,488
Crossroads SLA 2022/23    490,579 490,579
Cruse Bereavement SLA 2022/23    17,095 17,095
DAB Hands Mens
Shed
Community
Investment Fund -
Ward 5 
4,222   4,222
Dalguise & District
Public Hall
Administration Grant  250   250
Direct Design Website Maintenance  2,618   2,618
Duke of Edinburgh
Award Perth &
Kinross Association
Community
Investment Fund -
Ward 6 
5,500   5,500
Dunbarney Food Security Fund  3,000   3,000
Dunbarney &
Forgandenny Parish
Church
Community
Investment Fund -
Ward 9 
13,500   13,500
Dunkeld & Birnam
Community
Development Trust
Volunteer
Development Fund 
1,760   1,760
Dunkeld & Birnam
Sports & Leisure
Hub
Community
Investment Fund -
Ward 5 
1,550   1,550
Dunkeld and Birnam
in Bloom
Dunkeld  750   750
Dunkeld and Birnam
Sport and Leisure
Hub
Grant - CECF  14,470   14,470
Dunkeld Parish
Church
Cost of Living
Community Fund 
1,440   1,440
Dunning Church
Hall
Administration Grant  500   500
Dunning Community
Council
Community
Investment Fund -
Ward 7 
773   773 
Cost of Living
Community Fund 
2,500   2,500
Dunning Scout
Group
Community
Investment Fund -
Ward 7 
2,130   2,130
Elder Voice Volunteer
Development Fund 
3,609   3,609
Errol Village Hall Cost of Living
Community Fund 
2,400   2,400 
Administration Grant  250   250
Fair City Juniors FC Volunteer
Development Fund 
4,000   4,000
Feldy in Flower Jubilee boat display  750   750
Feldy Roo Food Security Fund  9,300   9,300
Food for Thought Food Security Fund  122   122
Forgandenny in
Flower
Forgandenny in
Flower Jubilee Fund 
379   379
Page 44 of 146

Page 45

Perth and Kinross Council  31 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Forgandenny
Village Hall
Administration Grant  250   250
Forteviot Hall Administration Grant  250   250
Fossoway & District
Community Council
Community
Investment Fund -
Ward 8 
4,031   4,031
Fowlis Wester
Village Hall
Committee
Cost of Living
Community Fund 
480   480 
Administration Grant  250   250
Friends of Crieff
Cemetery
Community
Investment Fund -
Ward 6 
637   637 
Strathearn/Strathallan
LAP 
500   500
Friends of Old St
Michael's 
Strathearn/Strathallan
LAP 
193   193
Game Square Eastern Perthshire
LAP 
500   500
Gardenature Ltd Nesting Boxes  762   762
Gask Hall (Mid
Strathearn Church)
Administration Grant  250   250
Georgetown
Community Hall
Administration Grant  250   250
Giraffe Trading CIC Community
Investment Fund -
Perth City 
5,000   5,000 
Cost of Living
Community Fund 
10,000   10,000
Glenfarg Community
Centre (Arngask
Hall)
Administration Grant  250   250
Glenfarg Community
Transport Group
Community
Investment Fund -
Ward 8 
5,000   5,000 
Cost of Living
Community Fund 
500   500
Grandtully &
Strathtay Hall &
Park Association
Administration Grant  250   250
Guildtown Village
Hall
Administration Grant  250   250
Headway Perth &
Kinross
Section 10  2022/23    997 997
Health & Wellbeing
Café (Salvation
Army)
Cost of Living
Community Fund 
1,300   1,300
Highland Perthshire
Cycling
Volunteer
Development Fund 
2,750   2,750
Holidays @ Home Community
Investment Fund -
Perth City 
2,000   2,000
Holy Trinity Scottish
Episcopal Church
Cost of Living
Community Fund 
500   500
Home Start Perth
and Kinross
Cost of Living
Community Fund 
2,000   2,000 
SLA 2022/23   10,000  10,000
Horizon Lunch Club Cost of Living
Community Fund 
1,840   1,840
Inch View Primary
Community Cafe
Food Security Fund  500   500
Page 45 of 146

Page 46

Perth and Kinross Council  32 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Inchture & Kinnaird
Parish Church
Community
Investment Fund -
Ward 1 
3,356   3,356
Inchture Village Hall Community
Investment Fund -
Ward 1 
2,200   2,200 
Administration Grant  250   250
Independent
Advocacy Perth &
Kinross
SLA 2022/23   76,225 295,572 371,797
Jeanfield Swifts FC Volunteer
Development Fund 
3,548   3,548
Junior Dippers Art
Group
Volunteer
Development Fund 
680   680
Kettins Community
Hub
Community
Investment Fund -
Ward 2 
1,850   1,850 
Cost of Living
Community Fund 
1,000   1,000 
Food Security Fund  600   600 
Administration Grant  250   250
Killiecrankie
Memorial Hall Trust
Community
Investment Fund -
Ward 4 
2,530   2,530 
Administration Grant  250   250
Killiecrankie,
Fincastle & Tummel
Community Council
Community
Investment Fund -
Ward 4 
2,732   2,732
Kinloch & District
SWI Hall
Administration Grant  250   250
Kinloch Memorial
Hall
Administration Grant  250   250
Kinnesswood in
Bloom
Jubilee celebrations  750   750
Kinnoull Hill
Woodland Park
Group
Grant 2022/23  150   150
Kinross & District
Men's Shed
Community
Investment Fund -
Ward 8 
3,500   3,500 
Cost of Living
Community Fund 
820   820 
Volunteer
Development Fund 
589   589
Kinross & District
Pipe Band
Volunteer
Development Fund 
904   904
Kinross After School
Club
Food Security Fund  5,060   5,060
Kinross Centre SLA 2022/23    110,340 110,340
Kinross Colts FC
Juniors
Community
Investment Fund -
Ward 8 
7,000   7,000 
Volunteer
Development Fund 
2,000   2,000
Kinross Community
Council
Community
Investment Fund -
Ward 8 
1,000   1,000
Kinross Day Centre Community
Investment Fund -
Ward 8 
2,000   2,000
Page 46 of 146

Page 47

Perth and Kinross Council  33 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total 
Cost of Living
Community Fund 
4,900   4,900
Kinross Parish
Church
Cost of Living
Community Fund 
500   500
Kinross Primary
School Parent
Council
Community
Investment Fund -
Ward 8 
2,000   2,000
Kinrossie Public Hall
Management Group
Community
Investment Fund -
Ward 2 
1,500   1,500 
Cost of Living
Community Fund 
300   300 
Administration Grant  250   250
Kinross-shire
Partnership
Community
Investment Fund -
Ward 8 
630   630
Kinross-Shire
Volunteer Group
and Rural Outreach
Scheme
Community
Investment Fund -
Ward 8 
1,200   1,200 
SLA 2022/23    6,808 6,808
Kinross-shire Youth
Enterprise SCIO
Cost of Living
Community Fund 
11,000   11,000
Kirkmichael Hall Administration Grant  250   250
Kirkmichael Session
House
Cost of Living
Community Fund 
1,300   1,300 
Volunteer
Development Fund 
224   224
Kynachan Hall
Management
Committee
Administration Grant  250   250
KYTHE Grant YPG activities -
NOLB  
1,200  1,200
Letham 4 All Cost of Living
Community Fund 
5,000   5,000 
Food Security Fund  10,000   10,000
Letham Climate
Challenge
Cost of Living
Community Fund 
3,470   3,470 
Allotment Enhance
Project 
2,012   2,012
Letham Community
Sports Club
Cost of Living
Community Fund 
11,500   11,500 
Food Security Fund  8,500   8,500 
Volunteer
Development Fund 
4,000   4,000
Letham St Marks
Church of Scotland
Cost of Living
Community Fund 
2,000   2,000
Letham4All Cost of Living
Community Fund 
12,178   12,178 
Food Security Fund  23,816   23,816
Loch of Clunie
Preservation Group
Community
Investment Fund -
Ward 5 
3,200   3,200
Loch Tayside CIC Community
Investment Fund -
Ward 4 
1,250   1,250
Logos Youth Project Community
Investment Fund -
Ward 6 
2,705   2,705 
Cost of Living
Community Fund 
2,420   2,420
Page 47 of 146

Page 48

Perth and Kinross Council  34 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total 
SLA 2022/23   600  600
Longforgan Bowling
Club
Digital Inclusion Fund  355   355 
Eastern Perthshire
LAP 
3,000   3,000
Luncarty and
Redgorton in Bloom
Jubilee  720   720
Luncarty Football
Club
Community
Investment Fund -
Ward 5 
3,000   3,000
Madderty Paths
Group
Administration Grant  150   150
Mantalk Community
Investment Fund -
Ward 3 
10,000   10,000 
Cost of Living
Community Fund 
3,376   3,376
McLean Hall Cost of Living
Community Fund 
3,500   3,500 
Administration Grant  250   250
Meigle & Ardler
Community Council
Community
Investment Fund -
Ward 2 
4,000   4,000 
Cost of Living
Community Fund 
800   800
Meikleour Village
Hall & Institute
Administration Grant  250   250
Men & Children
Matter Group
Volunteer
Development Fund 
300   300
Menopause Café Volunteer
Development Fund 
500   500
Methven & District
Community Council
Cost of Living
Community Fund 
5,110   5,110
Methven Community
Centre
Administration Grant  250   250
Mid Atholl Village
Hall Management
Committee
Administration Grant  250   250
Millbridge Hall Administration Grant  250   250
Milnathort and
Orwell Community
Council
Administration Grant  150   150
Milnathort Core
Paths Group
Community
Investment Fund -
Ward 8 
2,635   2,635
Mindspace Limited SLA 2022/23    201,566 201,566
Moubray Hall
Committee
Administration Grant  250   250
Moulin Hall Administration Grant  250   250
Mountain Belle
Wellness & Trinity
Church
Cost of Living
Community Fund 
630   630
Murthly Village Hall Administration Grant  250   250
Muthill Baby and
Toddler Group
Cost of Living
Community Fund 
1,277   1,277
Muthill in Bloom Jubilee celebrations  300   300
Muthill Kirk Session Cost of Living
Community Fund 
2,176   2,176
Muthill Monday Club Cost of Living
Community Fund 
270   270
Page 48 of 146

Page 49

Perth and Kinross Council  35 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
National
Schizophrenia
Fellowship
(Scotland)
Mental Health Carers
Project 2022/23   
45,134 45,134
Nature Connects
Perthshire CIC
Community
Investment Fund -
Ward 6 
3,180   3,180
Nest Creative
Spaces CIC
Community
Investment Fund -
Ward 3 
250   250 
Cost of Living
Community Fund 
300   300 
Volunteer
Development Fund 
60   60
Neuro Central Community
Investment Fund -
Ward 7 
5,400   5,400 
Volunteer
Development Fund 
2,000   2,000
NHS Tayside Food Security Fund  13,856   13,856 
Administration
Support  
2,303  2,303 
NHS Tayside Speech
& Language Therapy  
307,352  307,352
North Church Perth Food Security Fund  8,000   8,000
North Inch Golfers
Group
Grant  10,000   10,000
North Muirton
Community Council
Digital Inclusion Fund  628   628
North Muirton
Community Group
Cost of Living
Community Fund 
2,500   2,500
Orwell & Portmoak
Church
Cost of Living
Community Fund 
2,500   2,500
Oudenarde
Community Group
Community
Investment Fund -
Ward 9 
3,500   3,500 
Cost of Living
Community Fund 
2,400   2,400 
Digital Inclusion Fund  884   884
Pamis SLA 2022/23    9,958 9,958
Parent To Parent
Tayside
Support & Advocacy   60,844  60,844
People With A
Mission Ministries
Cost of Living
Community Fund 
1,000   1,000
Perform in Perth Volunteer
Development Fund 
200   200
Perth & Kinross
Countryside Trust
Bridge of Earn to
Newburgh Active
Travel 
10,000   10,000
Perth & Kinross
Disability Sport
Community
Investment Fund -
Ward 6 
3,571   3,571 
Volunteer
Development Fund 
1,145   1,145
Perth & Kinross
Foodbank 
Volunteer
Development Fund 
900   900 
Food Security Fund  40,000   40,000
Perth & Kinross
Gymnastics
Development Group
Community
Investment Fund -
Perth City 
4,144   4,144
Perth Access Cars SLA 2022/23    10,731 10,731
Page 49 of 146

Page 50

Perth and Kinross Council  36 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Perth Autism
Support
Community
Investment Fund -
Perth City 
4,250   4,250 
Community
Investment Fund -
Ward 3 
4,250   4,250 
Community
Investment Fund -
Ward 6 
4,250   4,250 
Community
Investment Fund -
Ward 8 
2,125   2,125 
Volunteer
Development Fund 
2,000   2,000 
Support   4,505  4,505
Perth Cathedral St
Ninians
Cost of Living
Community Fund 
3,400   3,400
Perth Citizens
Advice Bureau
Community
Investment Fund -
Perth City 
8,993   8,993
Perth City Junior
Netball Club
Community
Investment Fund -
Perth City 
4,735   4,735
Perth College
Development Trust
Cost of Living
Community Fund 
3,156   3,156
Perth College UHI SLA 2022/23   35,845  35,845
Perth Elim
Pentecostal Church
Cost of Living
Community Fund 
1,500   1,500
Perth High School Volunteer
Development Fund 
1,600   1,600
Perth Minorities
Association
Cost of Living
Community Fund 
5,000   5,000 
Food Security Fund  5,000   5,000 
Volunteer
Development Fund 
1,606   1,606
Perth Pickleball
Club
Volunteer
Development Fund 
944   944
Perth Riverside
Church
Cost of Living
Community Fund 
1,000   1,000 
Food Security Fund  200   200
Perth Six Circle
Project
SLA 2022/23    20,979 20,979
Perth St Leonards
In The Fields
Church
Cost of Living
Community Fund 
2,060   2,060
Perth Triathlon Club Volunteer
Development Fund 
594   594
Perth Ukrainian
Weekend Club
Community
Investment Fund -
Perth City 
6,000   6,000
Perth Welfare
Society
Volunteer
Development Fund 
757   757
Perth Youth Futsal Volunteer
Development Fund 
1,437   1,437
Perthshire Welfare
Society
Community
Investment Fund -
Perth City 
5,400   5,400 
Cost of Living
Community Fund 
6,480   6,480
Perthshire Wildlife Homes for Wildlife
Project 
2,275   2,275
Page 50 of 146

Page 51

Perth and Kinross Council  37 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total 
Tayside Ponds
Project 
3,125   3,125 
Forfar Swift project  875   875
Perthshire Women's
Aid
Cost of Living
Community Fund 
13,000   13,000 
SLA 2022/23   52,569  52,569 
Housing Support
Payment 
43,008   43,008
Pink Saltire Digital Inclusion Fund  1,086   1,086
Pitcairngreen Village
Hall
Administration Grant  250   250
Pitlochry & Moulin
Climate Café
Food Security Fund  180   180
Pitlochry & Moulin
Men's Shed
Community
Investment Fund -
Ward 4 
1,039   1,039 
Cost of Living
Community Fund 
867   867
Pitlochry Bowling
Club
Food Security Fund  2,500   2,500
Pitlochry Church of
Scotland
Cost of Living
Community Fund 
1,680   1,680
Pitlochry Garden
Share
Community
Investment Fund -
Ward 4 
3,000   3,000
Pitlochry in Bloom Jubilee celebrations  750   750
Pitlochry in Bloom
(Path Group)
Administration Grant  150   150
Pitlochry Repair
Café
Community
Investment Fund -
Ward 4 
1,955   1,955
PKAVS Community
Investment Fund -
Perth City 
7,500   7,500 
Community
Investment Fund -
Ward 3 
5,000   5,000 
Cost of Living
Community Fund 
6,625   6,625 
Eastern Perthshire
LAP 
2,282   2,282 
SLA 2022/23    499,460 499,460 
Volunteer
Development Fund 
2,185   2,185
Plus Perth Community
Investment Fund -
Perth City 
3,994   3,994
Plus Perth & Kinross SLA 2022/23    57,146 57,146
Portmoak Babies
and Toddlers
Community
Investment Fund -
Ward 8 
1,000   1,000
Portmoak
Community Council
Michael Bruce Way  150   150
Portmoak Hall
Committee
Community
Investment Fund -
Ward 8 
1,000   1,000 
Administration Grant  250   250
Pride in Meigle 2015 Path Grant 2022/23  150   150
Push (Perth &
Kinross) Ltd
SLA 2022/23    34,142 34,142
Page 51 of 146

Page 52

Perth and Kinross Council  38 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Rannoch
Community Trust
Community
Investment Fund -
Ward 4 
4,450   4,450 
Cost of Living
Community Fund 
2,500   2,500 
Administration Grant  150   150
Rattray Rugrats Food Security Fund  350   350
Remake Scotland Community
Investment Fund -
Ward 6 
4,568   4,568
River Tay
Community Sports
Hub
Volunteer
Development Fund 
3,500   3,500
Robert Douglas
Memorial Institute
Community
Investment Fund -
Ward 2 
5,330   5,330 
Cost of Living
Community Fund 
2,170   2,170 
Administration Grant  250   250
Royal Society for
the Protection of
Birds
Loch Leven Nature
Reserve 
10,000   10,000
Royal Voluntary
Service
SLA 2022/23    75,228 75,228 
Volunteer
Development Fund 
364   364
Sacro Mediation Services   2,500  2,500
Scone & District 50+
Club
Volunteer
Development Fund 
186   186
Scone & District
Community Council
Community
Investment Fund -
Ward 2 
5,609   5,609
Scone New Church
(Balformo Rd Hall)
Administration Grant  250   250
Scotland's Charity
Air Ambulance
Volunteer
Development Fund 
1,958   1,958
Scottish Fire &
Rescue Service
Community Action
Team
Cost of Living
Community Fund 
1,026   1,026
Scottish
Huntington's
Association
SLA 2022/23    30,694 30,694
SHIP SLA 2022/23   23,603  23,603
Simon Community
Scotland
Cost of Living
Community Fund 
2,500   2,500 
Housing Support
Payment 
291,753   291,753
Social Flock Community
Investment Fund -
Perth City 
17,206   17,206 
Cost of Living
Community Fund 
32,000   32,000 
Volunteer
Development Fund 
505   505
Society of St
Vincent de Paul
Cost of Living
Community Fund 
2,000   2,000
Sonic Bothy Strathearn/Strathallan
LAP 
2,240   2,240
South Perth
Community Garden
Volunteer
Development Fund 
540   540
Page 52 of 146

Page 53

Perth and Kinross Council  39 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
South Perth Green
Spaces Group
Administration Grant  150   150
Sparks Group Community
Investment Fund -
Ward 8 
2,300   2,300
Spittalfield Hall Administration Grant  250   250
St Brides Catholic
Church
Cost of Living
Community Fund 
480   480
St Columbas
Church
Cost of Living
Community Fund 
1,155   1,155
St Fillans
Community Trust
Community
Investment Fund -
Ward 6 
2,500   2,500 
Administration Grant  150   150
St John's Episcopal
Church
Cost of Living
Community Fund 
700   700
St Johnstone
Community Trust
Cost of Living
Community Fund 
13,358   13,358 
Volunteer
Development Fund 
105   105
St Madoes &
Kinfauns Parish
Church
Community
Investment Fund -
Ward 1 
12,182   12,182 
Cost of Living
Community Fund 
2,982   2,982 
Food Security Fund  4,155   4,155 
Volunteer
Development Fund 
1,943   1,943
St Madoes
Community
Association
Administration Grant  250   250
St Madoes Under 5s Community
Investment Fund -
Ward 1 
1,455   1,455
St Martin's Public
Hall
Cost of Living
Community Fund 
1,200   1,200 
Administration Grant  250   250
St Matthew's
Church
Cost of Living
Community Fund 
1,000   1,000 
Food Security Fund  500   500
St Stephen's RC
Church
Cost of Living
Community Fund 
1,250   1,250
Stanley & District
Public Hall
Administration Grant  250   250
Stanley
Development Trust
Community
Investment Fund -
Ward 5 
580   580 
Cost of Living
Community Fund 
4,814   4,814 
Path Grant 2022/23  150   150
Stanley FC 2011's Volunteer
Development Fund 
1,855   1,855
Stanley in Bloom Jubilee celebrations  750   750
Stingrays Swimming
Club
Community
Investment Fund -
Ward 7 
2,439   2,439
Stormontfield
Community
Association
Cost of Living
Community Fund 
400   400 
Administration Grant  250   250
Page 53 of 146

Page 54

Perth and Kinross Council  40 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
Strathcare Volunteer
Development Fund 
730   730
Strathearn Arts Cost of Living
Community Fund 
9,148   9,148
Strathearn Cares Cost of Living
Community Fund 
2,500   2,500 
Strathearn/Strathallan
LAP 
619   619
Strathearn Welcome Community
Investment Fund -
Ward 6 
1,040   1,040
Strathmore Centre
for Youth
Development
Food Security Fund  5,000   5,000 
Volunteer
Development Fund 
1,050   1,050
Strathmore
Community Hub
Cost of Living
Community Fund 
3,780   3,780
Strathmore Screens Community
Investment Fund -
Ward 3 
2,350   2,350
T42 Group at
Fairview School
Cost of Living
Community Fund 
448   448
Tabernacle Hall Administration Grant  250   250
Take a Pride in
Perthshire
Association
Abernethy in Bloom  10,698   10,698 
Aberfeldy in Bloom  2,299   2,299 
Kinross in Bloom  4,634   4,634
Tay and Earn Trust Cost of Living
Community Fund 
3,230   3,230 
Volunteer
Development Fund 
1,885   1,885
Tay Titans Cycling
Club
Volunteer
Development Fund 
1,721   1,721
Tayside Council On
Alcohol
SLA 2022/23    68,030 68,030 
CVSP Co-
ordinator_2022/23   
30,735 30,735
Tayside Trail
Association
Volunteer
Development Fund 
2,980   2,980
Tayside Upcycling &
Craft Centre
Community
Investment Fund -
Ward 1 
3,668   3,668
The Anglers Inn Cost of Living
Community Fund 
2,000   2,000
The Birks Cinema
Trust
Cost of Living
Community Fund 
5,970   5,970
The Birks of
Aberfeldy
Administration Grant  150   150
The Duchess Anne
Hall
Administration Grant  250   250
The Lighthouse for
Perth
Cost of Living
Community Fund 
1,500   1,500 
Crisis Support in
Schools  
33,601  33,601
The Perth and
Kinross Duke of
Edinburgh's Award
Association
Volunteer
Development Fund 
1,480   1,480
Page 54 of 146

Page 55

Perth and Kinross Council  41 
PROVIDER/GROUP DESCRIPTION CDS COM ECS HSCP Total
The Salvation Army
THQ
Housing Support
Payment 
418,192   418,192
The Sandison
Memorial Hall
Administration Grant  250   250
The Scottish
Crannog Centre
Community
Investment Fund -
Ward 4 
3,000   3,000
The University of
Edinburgh
CALL Scot
Partnership  
11,803  11,803
Thrifty One
Community Interest
Company
Cost of Living
Community Fund 
1,537   1,537
Trinity Church of the
Nazarene
Cost of Living
Community Fund 
8,920   8,920 
Volunteer
Development Fund 
1,140   1,140
Tulloch NET Cost of Living
Community Fund 
1,002   1,002
Tulloch Orchard Volunteer
Development Fund 
450   450
Turning Point
Scotland Services
Ltd
Housing Support
Payment 
583,506   583,506
Upper Tay Anti-
poverty Support
Group
Cost of Living
Community Fund 
3,750   3,750
Upper Tay Paths
Group
Paths Administration
Grant 
150   150
Victory Park
Development Group
Grant  5,731   5,731
Vision PK SLA 2022/23    202,558 202,558
Vitalityme CIC Cost of Living
Community Fund 
8,515   8,515 
Volunteer
Development Fund 
1,750   1,750
West Carse Public
Hall
Community
Investment Fund -
Ward 1 
3,000   3,000 
Administration Grant  250   250
West Perth Explorer
Scout Group
Volunteer
Development Fund 
1,800   1,800
Who Cares ?
Scotland
Independent
Advocacy  
11,682  11,682
Wildcare Ltd Swift Nestboxes  2,529   2,529
Williamson Hall
Management
Committee
Digital Inclusion Fund  1,514   1,514 
Administration Grant  250   250
Willowgate Activity
Centre
Volunteer
Development Fund 
1,950   1,950
Wolfhill Memorial
Village Hall
Administration Grant  250   250
YMCA Tayside Cost of Living
Community Fund 
15,240   15,240 
Volunteer
Development Fund 
780   780 
Grant   22,245  22,245
Grand Total  513,302 33,444,281 14,064,128 2,549,370 50,571,081 
Page 55 of 146

Page 56

Perth and Kinross Council  42 
ALEO Analysis 
Organisation Name CDS COM ECS HSCP Total
Culture Perth & Kinross (Charity) 42,503 3,673,301   3,715,804
Culture Perth & Kinross (Trading) 720 3,179 1,267 336 5,502
Horsecross Trading Ltd 1,751 1,845 2,300  5,896
Perth Theatre & Concert Hall
(previously Horsecross Arts)
282,750 718,480 35,060  1,036,290
Live Active Leisure  1,652 472  2,124
Live Active Leisure Ltd 26,258 4,257,956 84,194 173,941 4,542,349
Scottish Police Authority 3,042 26,083  1,049 30,174
ALEO Grand Total 357,024 8,682,496 123,293 175,326 9,338,139 
Tayside Contracts Analysis 
Description CDS COM ECS HSCP Total
Roads  18,141,778 1,162  18,142,940
Cleaning 329,703 184,048 5,951,387 21,044 6,486,181
Catering 644 2,464 6,025,922 3,895 6,032,925
Street Lighting  2,367,944   2,367,944
Other 100,536 190,334 968,973  1,259,843
Liquid Fuel 8,144 282,271 1,279  291,694
Signage  136,855 500 647 138,001
Rent  26,092   26,092
Sanitary  14,092 2,538  16,629
Tayside Contracts Total 439,028 21,345,876 12,951,760 25,585 34,762,249 
Page 56 of 146

Page 57

Perth and Kinross Council  43 
Appendix C – Perth and Kinross Council Future Contract Delivery Plan 
This plan sets out the anticipated future planned procurement activity. The year given
indicates the timescale in which we plan to issue a tender for the goods, service or works
for which we need to contract. 
This plan will be published on the Council website from February 2024. 
It is intended that all Contracts marked with an * are collaborative contracts with at least
one other Local Authority. 
It is intended that all Contracts marked ** will be a call-off from an existing framework. 
Corporate & Democratic Services
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC11844 Consultancy Treasury Consultancy 
PKC12172 Consultancy Independent Chair - Child and Adult
Protection Committee
2023
PKC10391 Council departments Banking Services 2025
PKC12249 Elections and voting Election equipment 2023
PKC12208 Energy Efficiency Fabric Improvements to Auchtergaven
Primary School
2023**
PKC11845 Finance Finance Asset Management System 
PKC11847 Finance Procurement Card embedded 2023**
PKC12233 Finance Investment Management System 2023
PKC10785 Technology Network/Infrastructure: Annual
maintenance & support – Uninterruptable
Power Supply (UPS)
2023
PKC11254 Technology Supply of maintenance and support for
Mitel Telecommunication System
2024
PKC11264 Technology Housing Management System 2024
PKC11271 Technology Network/Infrastructure: Supply of
Telephony services 
2024
PKC11283 Technology GovTech 2023**
PKC11618 Technology Citrix Estate Licence Subscription Renewal 2025**
PKC11619 Technology Software: Application maintenance &
support - Corporate Mobile Working
Toolkit
2027
PKC11620 Technology Northgate Contract (software) PJB/74311
Council Tax Benefits
2026
PKC11622 Technology Electoral Services 2023**
Page 57 of 146

Page 58

Perth and Kinross Council  44 
Corporate & Democratic Services
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC11623 Technology GovDelivery Communications Platform 2023
PKC11624 Technology Supply and Implementation of an
Enterprise Architecture Solution
2024**
PKC11627 Technology Software: Annual subscription – Core
Microsoft infrastructure systems / tools
2024**
PKC11628 Technology Mobile voice and data services (Digital
Inclusion)
2024**
PKC11630 Technology Software: Annual subscription - Network
Scanning Tool 
2024
PKC11631 Technology NHS Circuit rental 2024**
PKC11634 Technology Provision support and maintenance of an
Identify and access solution (IAM
solution)
2024**
PKC11636 Technology PSN DNS Services 2025**
PKC11638 Technology Software: Application maintenance &
support - Corporate Reporting Tool
2024**
PKC11642 Technology Supply of Internet Connection 2025**
PKC11643 Technology Supply of IP CCTV Communication Link for
A9/A85
2025**
PKC11648 Technology Support and maintenance for Planning
System
2026**
PKC11651 Technology Insurance Claims Recording System 2027
PKC11652 Technology Data Analysis Application for Maximising
Rental Income
2025**
PKC11653 Technology Online Engagement Platform 2023
PKC11940 Technology Business Process Modeller 2024**
PKC11946 Technology Mobile voice and data services 2026**
PKC11947 Technology Cyber Security Operations Centre (CSOC) 2026**
PKC11948 Technology Auto Attendant System - Support and
Managed Services
2024
PKC11949 Technology SolarWinds Maintenance 2024**
PKC11950 Technology Small Government Enterprise Agreement
for ArcGIS
2025**
PKC11951 Technology Support and Maintenance for Storage
Area Network (SAN) Solution 
2026**
PKC11952 Technology Provision of managed WAN Connectivity  2024**
PKC12059 Technology eLearning Solution 2023
Page 58 of 146

Page 59

Perth and Kinross Council  45 
Corporate & Democratic Services
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC12303 Technology Logotech - Hosted PSTM Maintenance 2024
PKC12357 Technology Mosaic Data Consultancy for Power BI 2023
PKC12358 Technology Data Cataloguing consultancy  2023**
PKC12360 Technology IOT /Sensor Deployment  2023**
PKC12362 Technology Citrix Estate Licence Subscription Renewal
(for Virtual Apps and Desktops Service)
2024**
PKC12363 Technology Executive Research Services 2024**
PKC12364 Technology GO Loader Support and Maintenance  2024
PKC12365 Technology Provision, support, and maintenance of
anti-virus Solution (Sophos)
2024**
PKC12366 Technology Secure mail data transfer solution (Egress) 2024**
PKC12367 Technology Secure Remote Desktop Access and
Support
2024
PKC12369 Technology AV Support - Council Chambers 2024
PKC12370 Technology Telephony Call Management System 2024
PKC12371 Technology Symphony iManage, iExchange, iMatch,
ASD and MapInfo Runtime - Maintenance
2024
PKC12372 Technology Website Content Management System 2025**
PKC12373 Technology Wi-Fi Network Planning & Management
Toolkit (Ekahau)
2024**
PKC12374 Technology Open Data Platform (CKAN) 2024**
PKC12375 Technology SOCITM Subscription 2024
PKC12376 Technology Customer Services Platform 2024
PKC12404 Technology Committee Services Software 2023
PKC12410 Facilities Fire Safety Products 2023**
PKC12412 Finance Security Services and Cash Collection 2023*
PKC12418 Facilities Cleaning Equipment TBC**
PKC12420 Housing
Maintenance
Construction Materials 2023** 
Page 59 of 146

Page 60

Perth and Kinross Council  46 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC11848 Consultancy Consultancy - Review of Housing
Improvements Team
2023
PKC11849 Consultancy Consultancy - Review of New Builds
Team/Process 
PKC11856 Consultancy Consultancy - Appointment of Consultants
for Retrofit Assessments - Shops & Offices
2023**
PKC11859 Consultancy Consultancy - Design of Fire Alarm
Replacements 
2023**
PKC11861 Consultancy Consultancy - Appointment of Consultants
for Small Capital Projects Works Delivery
(technical support to existing team) 
PKC11862 Consultancy Consultancy - Retrofit Assessments of all
Council Housing Stock based on Climate
Change Action Plan (to be combined with
Non-Domestic Retrofit Assessments and
review of EV charging and delivery of Waste
Strategy with other Council teams) 
PKC12148 Consultancy Biodiversity Consultancy 2023
PKC12343 Consultancy Detailed design for underpass 2023**
PKC12386 Consultancy Outsourced Sales Rep 2023 2023
PKC12438 Consultancy Employer's Agent 2023**
PKC12154 Employability, Skills Tay Cities Deal Digital Skills 2023
PKC12206 Energy Efficiency Low carbon energy storage and heating
technology
2023
PKC12322 Environmental
Health
Air Quality Laboratory Services 2023
PKC11378 Fleet Lease of Electric vehicles 
PKC11799 Fleet Supply of 4 x 2 Axle Hook lifts 2023**
PKC11803 Fleet Supply of 1 x Curtain-sider 2023**
PKC11805 Fleet Supply of 2 x Artics 2023**
PKC11806 Fleet Supply of 5 x RCVs 2023**
PKC11807 Fleet Supply of 5 x Tippers 2023**
PKC11808 Fleet Supply of 8 x Car Derived Vans 2023**
PKC11809 Fleet Supply of 14 x Pickups 2023**
PKC11810 Fleet Supply of 1 x Sweepers 2023**
PKC11812 Fleet Supply of 4 x Small Panel Vans 2023**
PKC11814 Fleet Supply of 3 x Trailed Leaf Vacuums 2023**
PKC11815 Fleet Supply of 1 x Vehicle Wash 2023**
PKC11816 Fleet Supply of 1 x Linked O Licence Trailer 2023**
PKC11819 Fleet Supply of 4 x Vehicle Bodies 2024**
Page 60 of 146

Page 61

Perth and Kinross Council  47 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC11820 Fleet Supply of 13 x Buses **
PKC11821 Fleet Supply of 4 x 4x4 Cars 2024**
PKC11822 Fleet Supply of 14 x Cars - Hatchback **
PKC11823 Fleet Supply of 3 x MPV 2023**
PKC11825 Fleet Supply of 1 x 4 Axle Hooklift **
PKC11826 Fleet Supply of 1 x RCV **
PKC11827 Fleet Supply of 1 x Skip Loader **
PKC11828 Fleet Supply of 4 x Tippers 2023**
PKC11829 Fleet Supply of 11 x Car Derived Vans **
PKC11830 Fleet Supply of 1 x Pickup **
PKC11831 Fleet Supply of 1 x Luton Van **
PKC11832 Fleet Supply of 11 x Panel Vans **
PKC11833 Fleet Supply of 4 x Small Panel Vans 2024**
PKC11834 Fleet Supply of 3 x Trailed Aerators 2023**
PKC11835 Fleet Supply of 1 x Mowar Rotary Deck **
PKC11836 Fleet Supply of 1 x Vehicle Ramp **
PKC11837 Fleet Supply of 8 x Ride on Mowers **
PKC11839 Fleet Supply of 10 x Trailers **
PKC11840 Fleet Supply of 4 x Agricultural Tractors **
PKC11841 Fleet Supply of 7 x Mowers **
PKC11842 Fleet Supply of Various GM Equipment **
PKC11843 Fleet Supply of 5 x Sweepers 2024**
PKC12109 Fleet Supply of 6 car derived vans 2025**
PKC12156 Fleet 5 x Ride on Cut & Collect Mowers 2023**
PKC12157 Fleet 5x Pedestrian Mowers 2023
PKC12160 Fleet 2 Dollys 2023
PKC12162 Fleet 5 x Ride on Cut & Collect Mowers 2023**
PKC12163 Fleet 5x Pedestrian Mowers 2023
PKC12192 Fleet Managed Service 2023 2023
PKC12207 Fleet Upgrade of Bredneck Vehicle Wash 2023
PKC12220 Fleet Purchase of Four Ejection Trailers 2023**
PKC12236 Fleet Supply of 1 Lease Car as per CCSRM6069 2023**
PKC12250 Fleet Supply of 3 RCVs 2023
PKC12251 Fleet Supply of 1 Tipper 2023**
PKC12252 Fleet Supply of 5 Pick-ups 2023
PKC12253 Fleet Supply of 3 Hatchback Cars 2024**
PKC12254 Fleet Supply of 1 4x4 Car 2024**
PKC12255 Fleet Supply of 1 MPV - 7 seat 2024**
PKC12256 Fleet Supply of 2 Artics 2024
PKC12257 Fleet Supply of 1 Hooklift 2024
Page 61 of 146

Page 62

Perth and Kinross Council  48 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC12258 Fleet Supply of 2/3 Library Vans 2024
PKC12259 Fleet Supply of 2 RCVs 2024
PKC12260 Fleet Supply of 3 Road Sweepers 2024
PKC12261 Fleet Supply of 5 Tippers 2024
PKC12262 Fleet Supply of 1 Pick-up 2024**
PKC12263 Fleet Supply of 8 Car Derived Vans 2024
PKC12264 Fleet Supply of 3 Pick-ups 2024
PKC12265 Fleet Supply of 1 Panel Van 2024**
PKC12266 Fleet Supply of 8 Panel Vans 2024
PKC12267 Fleet Supply of 7 Small Panel Vans 2024
PKC12268 Fleet Supply of 3 Van Derived MPV 2024
PKC12269 Fleet Supply of 12 Tippers 2024
PKC12270 Fleet Supply of 1 Scissor Lift 2024**
PKC12271 Fleet Supply of 1 Telescopic Boom 2024
PKC12272 Fleet Supply of 1 Quad 2024**
PKC12273 Fleet Supply of 4 Agricultural Tractors 2024
PKC12274 Fleet Supply of GM Equipment 2024**
PKC12285 Fleet Supply of 1 Lease Car as per CCSRM6069. S
Kinnon
2023**
PKC12286 Fleet Supply of 1 Lease Car as per CCSRM6069. J
Watson
2023**
PKC12302 Fleet Purchase of 2 Road Sweepers 2023**
PKC12348 Fleet Repair & Maintenance for 2 x Telehandlers 2023
PKC12349 Fleet Supply of 1 Lease Car as per CCSRM6069  2023**
PKC12352 Fleet Supply of 2 Artics 2023**
PKC12378 Fleet Schmidt to continue to service and
Maintain Pavement Sweeper
2023
PKC12384 Fleet Supply of 1 Lease Car as per CCSRM6069  2023**
PKC11983 Flooding Comrie Flood Protection Scheme (Main
Works)
2023**
PKC12346 Greener living Air Quality - Continuous Monitoring 2023**
PKC11880 Greenspace Seven Acres Park, Perth 
PKC12231 Housing Energy Performance Certificates  2023
PKC12382 Housing Void Property 15 Sheilhill Pl, Stanley  2023
PKC12383 Housing  Housing maintenance 2023
PKC11850 Housing
Improvements
Communal Door Entry Systems and Door
Sets with Associated Works 
PKC11853 Housing
Improvements
Registration of Energy Performance
Certificates 
PKC11857 Housing
Improvements
Shops and Offices Upgrades 2024
Page 62 of 146

Page 63

Perth and Kinross Council  49 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC11858 Housing
Improvements
Internal upgrades to properties at 8 St
Catherines Road and upgrades to closes at
St Catherine's Road and High Street, Perth
2024
PKC11851 Housing
Maintenance
Servicing, Inspection, Maintenance and
Reactive Maintenance of Fire Sprinkler
Systems in Domestic Properties and Bin
Stores.
2023
PKC11852 Housing
Maintenance
Servicing & Maintenance - Lightning
Conductor Testing 
PKC11854 Housing
Maintenance
Housing - Domestic Windows and Doors
Replacements 
PKC11860 Housing
Maintenance
Fire Alarm Replacements (Works Contract) 2023
PKC11863 Housing
Maintenance
Servicing & Maintenance - Additional
Emergency Lighting Servicing &
Maintenance Contracts based on
Controlled Door Entry Properties and
previous New Builds
2023**
PKC12300 Housing
Maintenance
Phase 5 Central Heating Contract  2023**
PKC12105 Housing Repairs Retrofit to Meet Energy Efficiency Standard
(EESSH2) Compliance 
PKC12202 Housing Repairs Void Energy Management 2023
PKC12350 Housing Repairs Lightning Conductors 2023
PKC12324 Housing Repairs &
Improvement
Registration of Energy Performance
Certificates
2023**
PKC12325 Housing Repairs &
Improvement
Housing - Domestic Windows and Doors
Replacements
2024
PKC12327 Housing Repairs &
Improvement
Energy Efficiency Works to existing housing
stock (2023/24)
2023
PKC12328 Housing Repairs &
Improvement
Energy Efficiency Works to existing housing
stock (2024/25)
2024
PKC12329 Housing Repairs &
Improvement
Smoke Detector Contract for phased
replacements
2026
PKC12330 Housing Repairs &
Improvement
Controlled Door Entry - ad hoc installs 2023**
PKC12331 Housing Repairs &
Improvement
Small Extensions to properties  ad hoc**
PKC12332 Housing Repairs &
Improvement
St Catherine's Square Regeneration project 2024
PKC12333 Housing Repairs &
Improvement
Sheltered Housing Heating Replacements 2023
Page 63 of 146

Page 64

Perth and Kinross Council  50 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC12335 Housing Repairs &
Improvement
Installation of Assisted Bathing and works
in communal areas in Sheltered Housing
2023
PKC12336 Housing Repairs &
Improvement
Window replacements at Greyfriars Hostel,
Perth
2023
PKC12337 Housing Repairs &
Improvement
External EPC's for NON EPC properties
(approx. 600)
2023
PKC12339 Housing Repairs &
Improvement
Room in roof insulation EPC band E & F
Properties
2023**
PKC12340 Housing Repairs &
Improvement
PV Solar to be installed Band E & F
Properties struggling to hit Band D
2023**
PKC12401 Housing Repairs &
Improvement
Housing Planned Maintenance  2023
PKC12408 Housing Repairs &
Improvement
Property Maintenance and Refurbishment 2023**
PKC12288 Planning & Housing Expansion of Home Energy Advice Services 2024
PKC11879 Play Areas Victory Park, Bridge of Earn 2024
PKC11881 Play Areas Muirend Park, Perth 2024
PKC11882 Play Areas Comrie 126 Core Path 
PKC11883 Play Areas Davies Park, Kinross 2023
PKC11884 Play Areas Scotlandwell Play Area, Kinross 2023
PKC11885 Play Areas Greenloaning Play Area 2024
PKC11886 Play Areas Langlands, Luncarty 2023
PKC11887 Play Areas Westfield Common 2023
PKC12307 Play Areas Potterhill Play area 2023**
PKC12308 Play Areas Coronation Park Muthill Play Area` 2023**
PKC12309 Play Areas Craigie Park Play Area 2023**
PKC12310 Play Areas Scotlandwell Play Area 2023**
PKC12311 Play Areas Davis Park Kinross Play Area 2023**
PKC12312 Play Areas Langland Luncarty Play Area 2023**
PKC12313 Play Areas Greenloaning Play Area 2023**
PKC12314 Play Areas Westfield Common 2023**
PKC12315 Play Areas Bridge of Earn Play Area 2023**
PKC12316 Play Areas Legion Park Comrie 2023**
PKC12317 Play Areas Muirend Park 2023**
PKC12442 Play areas Surface installation  2023**
PKC12177 Property Servicing and Maintenance of Local Exhaust
Ventilation systems and fume cupboards
2023
PKC12377 Public and
community transport
Bus Shelter Cleaning 2023
PKC12446 Repairs &
Improvements 
Alterations to parking bays at Rorrie
Terrace in Methven
2023
Page 64 of 146

Page 65

Perth and Kinross Council  51 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC11485 Roads and
pavements
Pedestrian counts and video survey –
Edinburgh Road, Perth 
PKC11874 Roads and
pavements
CCTV Survey **
PKC12180 Roads and
pavements
South Inch Culvert Repairs 2023
PKC12417 Roads and
pavements
Road Signage TBC**
PKC12159 Sponsorship/advertis
ing
Advertising on Fleet Vehicles 2023
PKC12243 Street Lighting LED Lanterns 2023
PKC12320 Street Lighting Street lighting repairs - Broxden 2023
PKC12415 Street Lighting Street Lighting Materials 2023**
PKC10970 Structures Old Perth Bridge Masonry Crack Stitching 2023
PKC10971 Structures Queens Bridge Scour Works 2023
PKC10973 Structures Queens Bridge Concrete Repair, Tie Bar &
Drainage Works
2023
PKC11964 Structures A827 Bolfracks wall replacement, Aberfeldy
- Phase 2
2023
PKC12001 Structures Bridge Inspections 23/24 Pack B3 2023**
PKC12002 Structures Bridge Inspections 23/24 Pack 1 2023**
PKC12004 Structures Scour Assessments 23/24 Pack 1 2023
PKC12290 Structures Queens Bridge Inspections / Monitoring 2023**
PKC12291 Structures Queens Bridge Concrete Repair Survey 2023**
PKC12292 Structures Fanny Burn Culvert Replacement  2023
PKC12293 Structures Bridge of Tilt repairs 2023
PKC12295 Structures Victoria, Caputh Bridge repairs 2023**
PKC12296 Structures Boatland Ret Wall repairs 2023**
PKC12297 Structures Burmeston Br repairs 2023**
PKC12298 Structures Gatehouse Culvert Repairs 2023
PKC12299 Structures Garry Viaduct Consultancy Services 2023**
PKC12176 Structures and
Flooding
Dillivaird Br Repairs 2023**
PKC12178 Structures and
Flooding
Wades Bridge, Aberfeldy 2023
PKC12224 Structures and
Flooding
Blairgowrie Weir Scour Repairs Stage 2 2023
PKC12237 Structures and
Flooding
Perth Integrated Catchment Study
(Optioneering)
2023
PKC12238 Structures and
Flooding
Bridge of Earn Surface Water Flood Study 2023
Page 65 of 146

Page 66

Perth and Kinross Council  52 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC12239 Structures and
Flooding
Comrie Surface Water Management Plan 2023
PKC12240 Structures and
Flooding
Luncarty Flood Study 2024
PKC12241 Structures and
Flooding
Kinross Surface Water Management Plan 2024
PKC12242 Structures and
Flooding
Watercourse Clearance & Repair Works 2023
PKC12247 Structures and
Flooding
Flooding Development Control Works  2023**
PKC12125 Structures and
Flooding
DCC Civils Framework Lot 5 Emergency
Works
2023**
PKC12356 Technology Clear Skies Software 2023
PKC12169 Traffic & Network
Team
Replacement Parking Machines 2023**
PKC12198 Traffic & Network
Team
On-street Residential EV Charging 2023**
PKC12114 Waste Provision of Compaction Equipment and
Processing of Cardboard
2023
PKC12194 Waste Food Waste  2023**
PKC12195 Waste Mixed Paper and Card 2023
PKC12215 Waste Processing of Food Waste 2023**
PKC12216 Waste Traffic Monitoring Technology for Recycling
Centres
2023**
PKC12217 Waste Processing of Street Sweepings 2024**
PKC12219 Waste Processing of Mixed Paper and Card 2023
PKC12228 Waste Delivery and Distribution of Plastic
Wheeled Bins
2023**
PKC12387 Waste Re-processing of Used Tyres  2023
PKC12361 Waste  Wheelie bin cleaning and recycling 2023
PKC12443 Waste Services Four Wheeled Bulker Bins for Domestic
Twin Stream Recycling
2023**
PKC12444 Waste Services Two Wheeled & Bulker bins for Commercial
Twin Stream Recycling
2023**
PKC10023 Waste Services -
Expenditure
Processing of Food Waste 2023
PKC10814 Waste Services -
Expenditure
Recyclable & Refuse Containers 
PKC11527 Waste Services -
Expenditure
Processing of Inert Waste 2023**
Page 66 of 146

Page 67

Perth and Kinross Council  53 
Communities
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC11864 Waste Services -
Expenditure
Processing of Organics 2023**
PKC11868 Waste Services -
Expenditure
Used Tyres 2023
PKC11870 Waste Services -
Expenditure
Mobile Toilets Framework 2023
PKC11871 Waste Services -
Expenditure
Waste Analysis 2024**
PKC11873 Waste Services -
Expenditure
Recycle and Refuse Containers **
PKC11289 Finance Debt Collection 2024**
PKC12409 Technology National Shared Digital Alarm Receiving
Centre
TBC**
PKC12413 Technology Technology Enabled Care Goods 2023** 
Page 67 of 146

Page 68

Perth and Kinross Council  54 
Education & Childrens Services
Delivery
Plan
Reference
Category Contract
Expected
Award
Date
PKC12117 Education Education training 2023
PKC12118 Education Play on Pedals- bikes 2023
PKC12170 Consultancy Digital Mental Health Support Service 2023
PKC12181 Consultancy Whole Family Wellbeing Programme –
Consultation with Families 
2023
PKC12182 Consultancy Whole Family Wellbeing Programme –
Support for whole system transformation 
2023
PKC12187 Schools and
Learning
Play on Pedal  2023
PKC12188 Schools and
Learning
Communication and Language through
Outdoor Learning Training 
2023
PKC12213 Finance PayPoint 2023
PKC12222 Education Educational Psychologists 2023**
PKC12227 Education Fear-less training & resources 2023
PKC12245 Play Areas Craigie primary playground markings 2023**
PKC12246 Play Areas Timber trail 2023**
PKC12275 Education Funded Providers of Early Learning &
Childcare
2023
PKC12276 Education Range of Family Support Services -
Homestart 
2024
PKC12277 Education Play on Pedals Bikes 2023
PKC12278 Education First Aid Training 2023
PKC12279 Education Vending Machines TBC
PKC12280 Education Range of Family Support Services  2024
PKC12281 Education Range of Family Support Services  2024
PKC12282 Education Whole Family Wellbeing Programme TBC
PKC12283 Education Family Mentoring Services 2023
PKC12284 Education TBC Crisis Support Services 2023
PKC12381 Education CALL Scotland 2023
PKC12385 Human Resources Agency staff for ECS 2023**
PKC12405 Education Bertha Park Bike Shelter Alterations  2023
PKC12407 Catering  Commercial Catering Equipment 2023**
PKC12414 Catering Bread and Rolls 2023**
PKC12432 Catering Fresh Fruit and Vegetables 2024**
Page 68 of 146

Page 69

Perth and Kinross Council  55 
Health & Social Care Partnership
Delivery
Plan
Referenc
e
Category Contract Expected
Award Date
PKC11181 Social Care Occupational Therapy equipment 2023
PKC11905 Social Care Floating Housing Support 2025
PKC12425 Support for adults
and older people
Care Homes for Adults with Learning
Disabilities Including Autism
TBC**
PKC12426 Social Care Care and Support 2024**
PKC12429 Social Care Secure Care 2024** 
Page 69 of 146

Page 70

Page 70 of 146

Page 71

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
31 JANUARY 2024 
REVENUE BUDGET 2023/24 – UPDATE NO. 3 
Report by Strategic Lead – Finance & Business Support
(Report No. 24/40) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2023/24 General Fund
Revenue Budget based upon the October 2023 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected over spend on the 2023/24 General Fund
Management Budget is £1.057 million (see Appendix 1). 
2. RECOMMENDATIONS 
2.1 The Committee is requested to: 
A. note the contents of the report. 
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2. 
C. note the projected outturn for Corporate Budgets and Perth & Kinross
Integration Joint Board set out in Section 6. 
D. note the funding update provided in Section 7. 
E. note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 4. 
F. approve the adjustments to the 2023/24 Management Revenue Budget
detailed in Sections 8, 9, 10 & 11 and Appendices 1, 2, 4, 5, 6 & 7. 
G. note the financial risks set out in Section 12 and Appendix 8. 
3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 2023/24 Additional Funding
6
Page 71 of 146

Page 72

Section 10 2023/24 Virements
Section 11 2023/24 Movements in Reserves
Section 12 Financial Risks
Section 13 Conclusions 
4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2023/24 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the October 2023 ledger,
updated for any subsequent known material movements. 
4.2 The budget total reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the 2023/24 Final Revenue Budget on
1 March 2023 (Report No. 23/72 refers).  In addition, adjustments approved
by the Council on 4 October 2023 (Report No. 26/268 refers), the Finance &
Resources Committee on 26 April, 13 September and 22 November 2023
(Report Nos. 23/120, 23/242 and 23/315 refer) and Executive Sub-Committee
of the Finance & Resources Committee on 24 July 2023 (Report No. 23/219
refers) are reflected in Appendix 1 (Column 2). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 The total net projected under spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £341,000 which represents 0.1%
of total net Service expenditure. 
5.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below.   
5.3 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted inflation
levels.  This is already being seen in the cost of the materials required by
property and housing maintenance teams.  Going forward, this may continue
to have an impact on projected outturns and future years’ budgets. 
Education & Children’s Services 
5.5 The projected outturn for Education & Children’s Services excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
anticipated to be £1.036 million or 0.4% less than budget – a movement of
£861,000 on the position last reported to Committee.  The individual elements
contributing to this position are summarised in the following table and
narrative. 
Page 72 of 146

Page 73

Function Projected Outturn Movement 
£’000 % £’000
Education Services Under spend (404) (0.9) (534)
Children, Young People & Families Under spend (101) (0.4) (101)
Business & Resource Services Under spend (75) (1.0) (44)
Catering Services Under spend (456) (6.3) (182)
TOTAL Under spend (1,036) (0.4) (861) 
5.6 Within non devolved Education Services there is reduction in the net
projected over spend of £534,000.  This is primarily made up of movements in
projected staff costs due to additional slippage and strikes (£667,000)
together with other net projected under spends (£25,000) partially offset by
movements in home to school transport projections (£158,000). 
5.7 In Services for Children, Young People & Families there is an increase in
the projected under spend of £101,000.  This is made up of projected under
spends on staff costs (£129,000) and additional income (£99,000) partially
offset by increases in the cost of direct provision to service users (£127,000). 
5.8 In Business & Resource Services there is an increase in the projected
under spend of £44,000 due, primarily to updated staff cost projections. 
5.9 In Catering Services, there is an increase in the projected under spend of
£182,000 based on the latest projections on school meal uptake. 
5.10 The Devolved School Management Scheme (DSM) is currently projected to
under spend by £239,000 due to staff slippage and additional income, which
represents 0.2% of the overall DSM budget.  However, individual schools are
experiencing challenges in delivering approved staff slippage targets.  The
budgets for the Devolved School Management scheme are allocated by
financial year (April – March), whereas expenditure is incurred by academic
year (August – June). 
5.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2024.  It is anticipated that the projected under
spend on teacher and support costs of £100,000 will be carried forward to
2024/25 to meet commitments.  The budgets for the Pupil Equity Fund
scheme are allocated by financial year, whereas expenditure is incurred by
academic year. 
Communities 
5.12 The projected outturn for Communities is currently anticipated to be £623,000
or 0.8% more than budget - which represents a movement of £623,000 on the
position last reported to Committee.  This position is summarised in the
following table and narrative. 
Page 73 of 146

Page 74

Function Projected Outturn Movement 
£’000 % £’000
Environmental & Consumer Services Over spend 938 2.5 798
Culture & Communities Over spend 115 0.9 (35)
Planning & Development Over spend 45 (0.7) 115
Housing Over spend 45 0.5 -
Business & Resources Under spend (520) 8.6 (255)
TOTAL Over spend 623 0.8 623 
5.13 In Environmental & Consumer Services there is an increase in the
projected net over spend of £798,000.  This is the net projected cost to the
Council of the severe weather events that took place in October 2023.  The
gross cost is currently estimated to be £1.232 million and is it anticipated that
£434,000 will be recovered under through the Bellwin Scheme with the
balance funded from unearmarked Reserves. 
5.14 In Culture & Communities the projected over spend has reduced by
£35,000. 
5.15 In Planning & Development there is a net increase in the projected over
spend of £115,000 due, in the main, to updated projections in relation to Perth
Harbour, commercial estates and electrical vehicle charging activity and
additional legal costs associated with planning appeals. 
5.16 Within Business & Resources there is an increase in the projected under
spend of £255,000 due to additional staff slippage and income partially offset
by IT licensing costs. 
Corporate & Democratic Services 
5.17 The projected outturn for Corporate & Democratic Services is currently
anticipated to be £60,000 or 0.1% more than budget – a movement of
£67,000 from the position last reported to Committee.  The main movements
are summarised in the following table and narrative. 
Function Projected Outturn Movement 
£’000 % £’000
Legal & Governance Services Under spend (118) (2.7) (12)
Finance Over spend 77 5.8 -
Human Resources Under spend (68) (2.0) (45)
IT & Revenues and Benefits Over spend 169 1.7 (10)
TOTAL Over spend 60 0.1 (67) 
5.18 Across the Service, staff cost and income projections have been updated
resulting in a net reduction in the projected over spend of £67,000. 
Chief Executive Service 
5.19 The projected outturn for the Chief Executive’s Service is currently anticipated
to be £12,000 more than budget. 
Page 74 of 146

Page 75

6. REVENUE MONITORING – CORPORATE BUDGETS 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Perth & Kinross Integration Joint Board 
6.2 In setting the 2023/24 final Revenue Budget, Perth & Kinross Integration Joint
Board approved the use of Reserves to deliver a balanced position.  However,
the financial position of the IJB remains challenging due to health and social
care continuing to face recruitment challenges, increasing client needs,
uncertainty over funding and rising costs particularly within prescribing. 
6.3 On 11 December 2023, the Audit & Performance Committee of the Perth &
Kinross Integration Joint Board received a financial update for the Health &
Social Care Partnership.  At that time there was a projected over spend of
£2.125 million which is set out in Appendix 3.  Within the overall projected
over spend, £1.283 million relates to social care. 
6.4 In relation to non-devolved functions there is currently a projected under
spend of £102,000 which is reflected in Appendix 1.   
Council Tax Reduction Scheme 
6.5 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.6 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements.  The following graph sets out both
variables over the current and previous six financial years.  The graph shows
a clear increase in the average weekly entitlement whereas the average
caseload has been more volatile but has returned to higher levels. 
Page 75 of 146

Page 76

6.7 In the current financial year, the Council is supporting approximately 8,500
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.65 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £1.150 million
which is reflected in Appendix 1. 
7. REVENUE MONITORING – FUNDING 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 December 2023
together with prior year comparative figures for the previous five financial
years. 
7.4 Between 2018/19 and 2022/23, the average collection figure to 31 December
was 81.83%.  The actual collection figure to 31 December 2023 was 81.49%
which is a reduction of 0.34% compared to the five-year average, and a
0.51% reduction on the comparable position in 2022. 
Page 76 of 146

Page 77

7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
7.6 Using the information on both in year and previous years collection rates,
along with the growth in the number of band D equivalent properties, the level
of Council Tax income is now projected to be £200,000 more than budget and
this is reflected in Appendix 1. 
Page 77 of 146

Page 78

Non-Domestic Rates 
7.7 The actual collection rate to 31 December 2023 was 79.98%, compared to
79.43% for the same period in 2022/23. 
8. REVENUE MONITORING – OTHER UPDATES 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 To date, no significant financial issues have been identified relating to Culture
Perth and Kinross or Perth Theatre & Concert Hall. 
8.3 Live Active Leisure finished 2022/23 with a revenue deficit of £203,000. For
2023/24, LAL has a budgeted deficit of £630,000, which it expects to rise to
£1.3 million in 2024/25. For 2023/24, LAL are funding the budgeted deficit
from their Reserves and at this stage, there is no ask of the Council.  The
financial consequences of the severe weather in October 2023 are anticipated
to be contained within the overall deficit for 2023/24.   
8.4 LAL’s projected deficits in 2021/22 and 2022/23 did not materialise, which is
positive. However, Council officers will work with LAL throughout the year on
best/worst/mid-range projections to ensure that the Committee has more
certainty about the likely year end position for 2023/24. This will be particularly
important to support work on the ALEO budget positions and SLA awards for
2024/25 given the continuing financial challenges which face the Council. 
Housing Revenue Account 
8.5 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 4. 
8.6 Across the Housing Revenue Account there is a net projected over spend of
£187,000.  The main reasons for these movements are updated staff cost
projections which include the full year financial implications of the 2023/24 pay
award and consultancy costs. 
8.7 As a result of the variances identified above Capital Financed from Current
Revenue will reduce by £187,000. 
9. 2023/24 ADDITIONAL FUNDING 
9.1 Since the 2023/24 Revenue Budget was updated on 22 November 2023
(Report No. 23/315 refers), the Council has been advised of additional funding
for the current financial year from several sources.  To ensure that the
Page 78 of 146

Page 79

2023/24 Management Budget continues to reflect the operational
requirements of the Council, several adjustments are required, which are
summarised below and included in Appendix 1 and Appendix 5. 
Scottish Government – Revenue Support Grant: 
• Pay – £4.191 million (all Services)
• Psychology – £6,000 (Education & Children’s Services) (ECS)
• Teacher’s Induction Scheme –£149,000 (ECS)
• Temporary Accommodation Pressures – £36,000 (Communities) 
• Ukraine Resettlement Scheme – £84,000 (Communities)
• Storm Babet – £9,000 (Communities)
• Self-Directed Support – £6,000 (Health) 
9.2 The Scottish Government has advised that the increase in funding identified
above of £4.481 million will be made through a redetermination of the
Council’s Revenue Support Grant.  It is therefore necessary to adjust budgets
for Education & Children’s Services, Communities, Corporate & Democratic
Services, Health & Social Care and Revenue Support Grant. 
9.3 ACTION: The Committee is asked to approve the adjustments set out at
paragraph 9.2 which is reflected in Appendix 1 (Column 3) to this report. 
Scottish Government Ring Fenced Grant 
9.4 The Scottish Government has advised that the final amount allocated for Pupil
Equity Funding will be £3,930 greater than previously advised. It is therefore
necessary to adjust both the budget for Education & Children’s Services and
Ring-Fenced Grants. 
9.5 ACTION: The Committee is asked to approve the adjustment set out at
paragraph 9.4 above.  These adjustments are reflected in Appendix 1
(Column 3) to this report. 
Other Funding 
9.6 Other funding amounting to £1.381 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 5. 
9.7 ACTION: The Committee is asked to note the receipt of £1.381 million of
additional resources, with this funding being reflected within Education &
Children’s Services and Communities as additional grant income.  The current
projected outturn assumes that all these additional resources will be fully
expended in 2023/24 or carried forward under the terms of the grant award. 
Page 79 of 146

Page 80

10. 2023/24 VIREMENTS 
Contribution to/from Capital Fund 
10.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
10.2 The latest monitoring indicates a projected reduction in capital financing costs
(loan charges) of £119,000 based on the latest treasury management activity
and a reduction in income of £235,000 from interest on revenue balances due
to updated interest rate projections.  This will result in a net reduction in the
Contribution to the Capital Fund of £116,000 in the current financial year. 
10.3 ACTION: The Committee is requested to approve the virement of £119,000
from the Capital Financing Costs (Loan Charges) Budget and £235,000 from
Interest on Revenue Balances with a corresponding reduction in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 4) to this report. 
10.4 At 31 March 2023, the audited 2022/23 Annual Accounts included a Capital
Fund balance of £26.343 million.  The Capital Fund is currently projected to
peak in 2024/25 at approximately £33.609 million, before gradually reducing
until fully utilised in 2038/39. 
11. 2023/24 MOVEMENTS IN RESERVES 
11.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2023 (per audited
Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2023/24, 2024/25 and 2025/26.
• The impact of proposals within this report on earmarked Reserves.
• Known commitments against earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves.
11.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied. 
ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts 
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals.
Page 80 of 146

Page 81

11.3 Proposals involving earmarked Reserves under i. and ii. above will be advised
to Committee in summary as Council either has limited discretion or
previously approved their application.  Proposals to apply earmarked
Reserves under iii. above will include more detail for elected member
consideration. 
Balances Held for Specific (Previously Approved) Purposes 
11.4 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
The proposals listed below transfer funding to earmarked Reserves to be
applied in future years. 
• Working Smarter - £115,000
• Revenue Maintenance - £67,000
• Workforce Management (including Transformation) - £410,000 
11.5 Approval is also sought to draw down up to £60,000 from the Culture
earmarked Reserve to purchase fixtures and fittings that will support the
delivery of the café within Perth Museum.   
11.6 Furthermore, approval is sought to apply resources of up to £170,000 from
the Culture earmarked Reserve in 2024/25 to meet upfront costs of
operating the Perth Museum café until 30 September 2024.  It is anticipated
that this will be repaid by Culture Perth and Kinross from future revenues. 
11.7 ACTION: the Committee is asked to approve the application of up to
£230,000 from the Culture earmarked Reserve to fund upfront costs relating
to the opening of Perth Museum. The adjustment for 2023/24 is reflected in
Appendix 1 and for 2024/25 will be reflected in the Reserves Strategy
considered by Council on 28 February 2024. 
11.8 In addition, in setting the 2023/24 Revenue Budget in March 2023 the
Council Approved Expenditure to fund several specific initiatives.  For a
variety of reasons including consultation and capacity issues, there has been
slippage in the delivery of a few of these projects that may result in the
expenditure not being incurred in the current financial year.  Projects totalling
£530,000 are set out at Appendix 7. 
11.9 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 7 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery.
The final outturn for individual projects may change before the end of the
financial year. Therefore, by agreeing the projects within Appendix 7, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves. 
11.10 Should any of the projects no longer be a priority, the projected under spend
would be available to support the financial management of the Council in both
current and future financial years. 
Page 81 of 146

Page 82

11.11 ACTION: The Committee is asked to confirm that the projects listed in
Appendix 7 remain a priority and that the final under spends, currently
projected at £530,000 are transferred to an earmarked Reserve to ensure
delivery. 
Unearmarked Reserves 
11.12 The 2023/24 SJC pay negotiations have now concluded with payments being
made to staff in November and December 2023.  Part of the funding of these
2023/24 SJC negotiations was a contribution from Councils.  For Perth &
Kinross Council this means a contribution from unearmarked Reserves of
approximately £1.036 million in the current financial year which is reflected in
Appendix 1.  This contribution from unearmarked Reserves may reduce
when the local government finance order is published in March 2024, and this
will be reflected in the next revenue monitoring report.  This will become a
recurring funded pressure going forward and be included in the 2024/25
Provisional Revenue Budget that the Council will be asked to approve on 28
February 2024. 
11.13 ACTION: The Committee is asked to apply £1.036 million from unearmarked
Reserves to fund the 2023/24 SJC pay award.  This adjustment is reflected in
Appendix 1. 
11.14 Subject to approval of the proposals included within this report and
recognising the known commitments, the level of earmarked Reserves will
reduce to £29.757 million and the level of unearmarked Reserves will reduce
to £14.017 million or 3.1%. 
12. FINANCIAL RISKS 
12.1 In preparing the Council's 2023/24 Revenue Monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
12.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
12.3 Financial risks previously identified are summarised in Appendix 8. 
13. CONCLUSION 
13.1 Based on the October 2023 ledger, a projected over spend of £1.057 million
has been identified in the current financial year. 
13.2 This level of projected over spend and contributions from unearmarked
Reserves included within this and previous reports will result in a reduction in
the level of unearmarked Reserves to £14.017 million or 3.1%. 
Page 82 of 146

Page 83

13.3 The financial position of the Council and its partners and ALEOs remains
challenging and regular updates will be provided to the Council and the
Finance & Resources Committee as the position develops. 
APPROVED 
Name  Designation Date
Stewart Mackenzie  Head of Finance 23 January 2024
Karen Donaldson  Chief Operating Officer 23 January 2024
Clare Mailer  Director – Strategy,
People & Resources
23 January 2024 
Page 83 of 146

Page 84

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 84 of 146

Page 85

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Executive Leadership Team have been consulted in the preparation of
this report.
Page 85 of 146

Page 86

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix 1 – 2023/24 Management Budget
• Appendix 2 – General Fund 2023/24 Projected Outturn – Service
Analysis
• Appendix 3 – Health & Social Care Partnership
• Appendix 4 – Housing Revenue Account 2023/24 Projected Outturn
• Appendix 5 – Other Fundings
• Appendix 6 – General Fund Balances
• Appendix 7 – Council Approved Expenditure
• Appendix 8 – Financial Risks 
Page 86 of 146

Page 87

(1) (2) (3) (4) (5) (6) (7) (8) (9)
2023/24 Previously Movements Virements Movements 2023/24 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 1
Service Budgets
Education & Children's Services 230,985 8,338 1,970 (135) 241,158 240,122 (1,036) (0.4%)
Communities 70,439 9,955 1,593 (280) 81,707 82,330 623 0.8%
Corporate & Democratic Services 39,596 1,089 812 (232) 41,265 41,325 60 0.1%
Chief Executive Service 3,712 1,341 (410) 4,643 4,655 12 0.3%
Sub - Total: Service Budgets 344,732 20,723 4,375 0 (1,057) 368,773 368,432 (341) (0.1%)
SECTION 2
Corporate Budgets
Health & Social Care 83,958 2,870 1,146 (5) 87,969 87,867 (102) (0%)
Contribution to Valuation Joint Board 1,309 1,309 1,309 0 0.0%
Capital Financing Costs 15,137 (175) (119) 14,843 14,843 0 0.0%
Interest on Revenue Balances (5054) (996) 235 (5,815) (5,815) 0 0.0%
Net Contribution to/(from) Capital Fund 3,099 1,171 (116) 4,154 4,154 0 0.0%
Contribution to/(from) Insurance Fund 200 200 200 0 0.0%
Trading Operations Surplus (550) (550) 0 550 100.0%
Support Service External Income (2153) (2,153) (2,153) 0 0.0%
Tayside Pension Fund 1,725 (70) 1,655 1,655 0 0.0%
Apprenticeship Levy 818 138 956 956 0 0.0%
Council Tax Reduction Scheme 6,200 6,200 7,350 1,150 18.5%
Discretionary Relief 1,104 1,104 1,104 0 0.0%
Net Expenditure (General Fund) 450,525 23,661 5,521 0 (1,062) 478,645 479,902 1,257 0.3%
SECTION 3
Funding
Revenue Support Grant (239,627) (9,349) (4,481) (253,457) (253,457) 0 0.0%
Ring Fenced Grant (17,725) 4 (4) (17,725) (17,725) 0 0.0%
Non Domestic Rate Income (60,754) (60,754) (60,754) 0 0.0%
Council Tax Income (103,914) (103,914) (104,114) (200) (0%)
Capital Grant (1,600) (30) (1,630) (1,630) 0 0.0%
Total Financing (423,620) (9,375) (4,485) 0 0 (437,480) (437,680) (200) (0%)
Financed from/(returned to) Reserves 26,905 14,286 1,036 0 (1,062) 41,165 42,222 1,057
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2023/24 REVENUE
BUDGET - SUMMARY
APPENDIX
1    
6
Page 87 of 146

Page 88

Page 88 of 146

Page 89

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 October 2023)
Variance Variance
£'000 £'000
Education & Children's Services
Total (1,036)
0 DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
There are 66 primary schools, 7 secondary schools, 4 all through schools, 46 nurseries and early learning
centres and 1 special school within the Council's DSM scheme.  Each school has an individual budget, primarily
based on pupil numbers.  Headteachers are responsible for the annual budgets devolved to them in April each
year. The total DSM budget for 2023/24 is £132.051 million including carry forwards. 
Within the scheme there is a facility allowing for DSM balances, whether surplus or deficit, to be brought
forward from the previous financial year. In addition to the resources devolved, balances may also be available
to headteachers of schools that have a carry forward. In 2022/23, £722,000 of DSM balances were brought
forward.
(200) Projected under spend on staff costs due to delays in filling vacancies.
(39) Projected recovery of income from Scottish Qualifications Authority
239 There is currently a projected net under spend of £239,000 based on current spending plans from schools for
the current academic year that runs to June 2024.  The maximum carry forward under the DSM scheme is
2.5%,  the current projection is 0.2%.  The delivery of budgeted slippage targets remains challenging within
individual schools.
Pupil Equity Fund
100 The majority of schools within Perth & Kinross Council have been allocated a share of £1.874 million of Pupil
Equity Funding from the Scottish Government as a ring fenced grant.  Schools are being instructed to use this
year’s PEF Grant by 31 March 2024 as per the revised Scottish Government guidance. At this time £100,000 is
projected to be carried forward into 2024/25 for teacher and support staff costs to the end of the current
academic year.
(100) Projected carry forward of Pupil Equity Funding.
NON DEVOLVED
Education Services
Nursery Sector
(752) Additional slippage due to turnover of staff, appointments at the lower end of pay scales and impact of strikes
that took place earlier this financial year.
(32) Projected under spend on non domestic rates.
114 Projected under recovery of income due to reduced attendances at Kids Clubs
Primary Sector
935 Slippage target currently not being met within primary sector due to requirement to maintain teacher numbers
partially offset by the impact of strikes that took place earlier this financial year.
(41) Projected under spend on home to school transport.
Secondary Sector
52 Staff slippage target not being met.
(27) Projected under spend on home to school transport.
4 Increased loan charges due to interest rate rises.
Special Sector
(611) Additional slippage due to turnover of staff, appointments at the lower end of pay scales and impact of strikes
that took place earlier this financial year.
3 Projected over spend on home to school transport.
16 Increased loan charges due to interest rate rises.
(65) Projected under spend on residential placements.
SERVICE Summary of Service Variances
6
Page 89 of 146

Page 90

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 October 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Services for Children, Young People & Families
(279) Projected under spend taking account of non-recurring funding of £800,000 provided for 2023/24  and staff
slippage due to delays in filling posts and proactive workforce management as part of the transformation
review.
41 Projected over spend on legal fees and translation / interpreter services
(20) Projected under spend on property costs.
56 Projected over spend on client travel.
216 The budget for young people with complex behavioural issues, which includes a number of pupils placed within
residential schools, is projected to over spend based on the latest placements.  This includes the provision of
£1.152 million of non-recurring funding.
(17) Projected under spends on Kinship Care (£60,000) and Foster Care (£2,000) partially offset by projected over
spends on Adoption (£45,000) due to increased demand.
32 There is a projected over spend in relation to supporting care experienced young people (continuing care,
supported accommodation) due to a doubling of the number of DWP clients. 
83 There is a projected over spend on self directed support (children & disability team - respite provision) due to
the level of demand and an increase to the hourly rate paid to clients.
(213) Additional grant funding from Unaccompanied Asylum Seeking Children (£209,000) and income from the Duke
of Edinburgh scheme (£4,000) which offset some of the costs above.
Business and Resources Services
(127) Additional slippage due to turnover of staff.
17 Projected over spend following an increase in the SEEMIS Licence costs, courier recharge, electrical testing &
advertising.
35 Projected income shortfall on school lets.
Catering Services
(500) Projected under spend within the Early Learning & Childcare 1140 grant for nursery meals based on latest
uptake.
44 Projected net over spend on the provision of school meals.
Page 90 of 146

Page 91

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 October 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Communities
Total 623
ENVIRONMENTAL AND CONSUMER SERVICES
Roads
(100) Projected additional income from statutory road network works
65 Projected over spend on flood maintenance contracts
(50) Projected under spend on Street Lighting maintenance
1,232 Projected additional costs relating to severe weather events in October 2023.
(434) Income recoverable from the Scottish Government under the terms of the Bellwin Scheme
150 Additional costs in relation to maintenance around the River Ericht
(150) Contribution from Scottish Government to River Ericht works
(100) Projected saving on street lighting contract
Regulation
25 Projected shortfall in Corporate Health and Safety income
Operations
300 Projected net shortfall in commercial waste income
(250) Projected additional income from sale of recyclates due to favourable market prices and introduction of twin-
streaming collection
35 Additional hire costs for refuse collection vehicles
(100) Projected saving on waste disposal contract following introduction of twin-streaming collection
50 Projected over spend on supplies and services
Fleet Management
(115) Saving on loan charges due to slippage on planned vehicle replacement programme
250 Additional cost of vehicle materials and repairs
Waste Strategy
40 Additional consultancy costs to support the review of operational assets.
130 Projected expenditure on education and awareness for introduction of twin-streaming collection service
Bereavement Services
(40) Additional income from Bereavement Services
CULTURE AND COMMUNITIES
150 Savings delayed on Single Cultural Trust.
(35) Projected under spend on period dignity activity.
PLANNING AND DEVELOPMENT
70 Perth Harbour - projected increase in operating costs /shortfall in income
(100) Projected additional Planning & Building Warrant Income based on income trend to date
60 Projected over spend within Estates Commercial Property account.
(50) Projected under spend of energy costs, net of maintenance costs for electric vehicle charging points.
65 Projected over spend on legal costs associated with planning appeals.
HOUSING
45 Projected increase in energy costs at Greyfriars Hostel
20 Void Rent Loss for housing support properties
(20) Temporary accommodation - reduction in estimated bad debt provision
BUSINESS AND RESOURCES
Service Wide
(550) Slippage in excess of budgeted target.
30 Projected over spend on IT licensing and support costs.
Public Transport Unit / Car Parking Account
25 Perth Bus Station - increased costs
60 Projected net over spend on Tendered Services
(120) Projected additional income from park and ride departure charges.
35 Additional IT licensing costs
Page 91 of 146

Page 92

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 October 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Corporate & Democratic Services
Total 60
Legal & Governance Services
(148) Projected under spend on staff costs.
30 Updated projections in relation to income and supplies and services.
Finance
77 Over spend on external audit fee following increase in charges and licensing costs.
Human Resources
(68) Projected net under spend on staff costs, supplies & services and income.
Information Technology and Revenues & Benefits
(50) Projected under spend on staff costs
86 Projected  over spend on supplies and services, including postages, interpreter services and licensing costs
78 Projected over spend on crisis grants and community care grants
55 Projected shortfall in income
Property
522 Projected overspend on property maintenance across the Council estate
(351) Projected under spend on energy based on consumption to date.
(229) Projected under spend on Pullar House due to updated inflation assumptions
58 Net over spend across the function including non-delivery of slippage target
Chief Executive Service
Total 12 Core Costs
12 Minor projected over spends across the Service.
TOTAL (341)
Page 92 of 146

Page 93

APPENDIX 3
Perth and Kinross Integration Joint Board (IJB)
Projected outturn based on Revenue Monitoring to 31 October 2023
Social Care Health
Health & Social
Care
Partnership
£'000 £'000 £'000
DEVOLVED FUNCTIONS
Older People Services 3,058 (33) 3,025
Adult Services (369) (351) (720)
Other Community Services (165) 0 (165)
Management/Commissioned/Other (136) 8 (128)
Undelivered Savings 872 740 1,612
Sub Total - Hospital & Community Health 3,260 364 3,624
P&K IJB Lead Partner 0 (817) (817)
Dundee & Angus Hosted Services Recharges In/Out excl Covid 0 1,133 1,133
Sub Total - Lead Partner Arrangement 0 316 316
GP Prescribing / Other Family Health Services 0 3,132 3,132
General Medical Services / Family Health Services 0 0 0
Sub Total - PKHSCP 3,260 3,812 7,072
Approved Use of General Reserves in 2023/24 (1,977) (2,970) (4,947)
Total Projected Outturn PKHSCP 1,283 842 2,125
NON - DEVOLVED FUNCTIONS (102) (102)
Projected Out-turn Over / (Under) Spend
6
Page 93 of 146

Page 94

Page 94 of 146

Page 95

APPENDIX 4
PERTH & KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2023/24 PROJECTED OUTTURN
(Based on expenditure to 31 November 2023)
£'000
0 Housing Repairs
Projected under spend on staff costs (£60,000) and supplies & services (£8,000), partially offset by additional property costs (£14,000),
transport hire (£34,000) and internet of things (£20,000).
68 Improvements
Additional costs in relation to retrofit strategy (£78,000) partially offset by projected under spend on staff costs (£10,000).
304 Letham, North & South
Projected over spends on IT costs (£90,000); staff costs (£118,000), decant costs in relation to burst pipes (£44,000); garden
maintenance (£31,000); costs of uplifts, cleans & grass cuts (£44,000); cleaning (£5,000) and other non-staff related budgets (£5,000). 
These are partially offset by a projected under spend on sheriff officer fees (and related income) (£20,000) and transport costs
(£13,000).
49 Perth City and Specialist
Projected over spends on decant costs / disturbance payments relating to burst pipes (£42,000), staff costs(£7,000) and energy
(£6,000), partially offset by projected under spends on additional income from the Common Housing Register (£18,000). 
20 Housing Management
Projected over spend on staff costs.
(356) Administration
Projected under spend on bad debt provision based on latest assessment of arrears (£300,000), an increased net income from
recharges to and from the Housing Revenue Account (£30,000) and under spends on property costs (£26,000).
102 Income
Projected shortfall in mainstream rental income due to less properties than anticipated when budget was set (£344,000) and reduced
income for commercial rent (£30,000).  These are partly offset by projected increased income for Interest on Revenue Balances
(£256,000) and additional income for garages and lock-ups (£16,000).
(187) Capital Financed from Current Revenue
As a result of the projected net under spends highlighted above, this is the increase in the amount available to invest in the HRA
capital programme from the Revenue Budget.
0
Summary of Service Variances
6
Page 95 of 146

Page 96

Page 96 of 146

Page 97

APPENDIX 5
Other Grant Funding
Education & Children’s Services
Scottish Government – Strategic Equity Funding £499,802
Scottish Government – Scottish Milk and Healthy Snack Scheme £246,890
Scottish Government – Care Experienced Children & Young People £157,657
Communities
UK Government – Homes for Ukraine - Quarter 1 £278,450
Scottish Government – Rural Community Local Development Challenge Funding 23-24 £198,500
TOTAL £1,381,299
6
Page 97 of 146

Page 98

Page 98 of 146

Page 99

Appendix 6
General Fund Reserves Update
Proposals
Included in
Report
Commit-
ments
31/3/23 23/24 24/25 25/26 Balance
£m £m £m £m £m £m
General Fund Balance 70.046
Balances Held Under Statute / Regulation
- Revenue Grants (15.947) 9.755 (6.192)
- Council Tax Income for affordable housing (4.353) 0.112 (0.283) (0.283) (4.807)
- Developers Contributions: Affordable Housing (4.298) (4.298)
- Car Parking (1.512) (1.512)
- Developers Contributions: Commuted Sums (1.242) (1.242)
- Devolved School Management (0.722) 0.722 0.000
Sub total (28.074) 10.589 (0.283) (0.283) 0.000 0.000 (18.051)
Balances Held for Specific (Previously Approved) Purposes
- Services for Children, Young People & Families (2.139) 1.858 (0.281)
- Contribution to 2023/24 Revenue Budget (1.699) 1.699 0.000
- Perth High School (1.446) 0.450 0.312 (0.684)
- Culture (1.172) 0.031 0.230 (0.911)
- Learning Estate Decants (0.700) 0.700 0.000
- Financial Insecurity (0.680) 0.680 0.000
- School Counsellors (0.556) 0.227 0.227 0.102 0.000
- Works Maintenance (0.400) 0.200 (0.200)
- Bertha Park High School (0.347) 0.274 (0.073)
- Modern Apprentice Scheme (0.340) 0.033 0.307 0.307 0.307
- Project Feasibility Fund (Covid-19) (0.279) 0.211 0.040 (0.028)
- Cemetery Walls (0.271) 0.026 0.126 0.119 (0.067) (0.067)
- Primary School at Bertha Park (0.270) (0.270)
- Perth and Kinross Offer (0.252) 0.252 0.000
- PH20 (0.212) 0.150 (0.062)
- Working Smarter (Covid-19) (0.194) 0.040 0.120 0.034 (0.115) (0.115)
Approved
Contributions from /
(to)
Reserves
6
Page 99 of 146

Page 100

Appendix 6
General Fund Reserves Update
Proposals
Included in
Report
Commit-
ments
31/3/23 23/24 24/25 25/26 Balance
£m £m £m £m £m £m
Approved
Contributions from /
(to)
Reserves
- UCI Cycling World Championships (0.180) 0.180 0.000
- Community Resilience 0.000 (0.175) (0.175)
- Climate Change (0.153) 0.153 0.000
- Ventilation Measures (0.114) 0.090 0.024 0.000
- Salix (0.113) 0.025 0.088 0.000
- Local Area Partnerships (0.090) 0.030 (0.060)
- Community Investment Fund (0.089) 0.051 (0.038)
- Grounds Maintenance ( A9/A85) (0.060) 0.060 0.000
- Local Government Elections 0.000 (0.053) (0.053) (0.053) 0.159 0.000
- Financial Assistance (Mod) 0.000 (0.020) (0.020) (0.020) (0.060)
- Council Approved Expenditure 0.000 (0.173) (0.510) (0.683)
Sub total (11.756) 6.999 1.043 0.182 (0.462) 0.594 (3.400)
Balances Held for Other Purposes 0.000
- Transformation & Workforce Management (9.530) 2.988 0.260 0.060 (0.410) (6.632)
- Covid-19 (2.193) 0.479 0.040 (1.674)
Sub total (11.723) 3.467 0.300 0.060 (0.410) 0.000 (8.306)
Earmarked Reserves (51.553) 21.055 1.060 (0.041) (0.872) 0.594 (29.757)
Uncommitted General Fund Balance 18.493
Impact of Current Year Projected Outturn (1.057)
Commitments from unearmarked Reserves (3.419)
Updated Uncommitted General Fund Balance 14.017
Percentage of Net Revenue Budget 3.1%
Page 100 of 146

Page 101

APPENDIX 7
Council Approved Projects - 1 March 2023
Education & Children’s Services
Pipes and Drums £65,000
Educational Training £70,000
Communities
Public Realm Works £40,000
Leisure & Cultural Assets Review £105,000
Community Asset Transfer £125,000
Visitor Rangers £50,000
Choose Life (Suicide Prevention) £20,000
Chief Executive's Service
Child Poverty Small Grants £50,000
Health & Social Care Partnership
Mental Health Self Help Groups £5,000
Total £530,000
6
Page 101 of 146

Page 102

Page 102 of 146

Page 103

Appendix 8
FINANCIAL RISKS
Risk to Revenue Budget Mitigation
1 Achievement of staff slippage targets, particularly
relating to teacher numbers and impact on pupil /
teacher ratio
- Proactive workforce
management
- Revenue monitoring
- Future budget submissions
2 Increasing demand / need / complexity for services
for children, young people and families and
reducing budgets.
- Proactive management
- Revenue monitoring
- Future budget submissions
3 Ceasing of additional Financial Insecurity Funding
on 31 March 2024.
- Proactive management
- Revenue monitoring
- Future budget submissions
4 Current year non-teaching pay awards - Revenue monitoring
- Future budget submissions
5 Support for Tayside Contracts - Tayside Contracts
Governance & Strategy Group
- Revenue monitoring
- Future budget submissions
6 Inflation - Revenue monitoring
- Future budget submissions
6
Page 103 of 146

Page 104

Page 104 of 146

Page 105

PERTH & KINROSS COUNCIL 
Finance & Resources Committee 
31 January 2024 
COMPOSITE CAPITAL BUDGET 2023/28 & HOUSING INVESTMENT
PROGRAMME 2023/28 – MONITORING REPORT No.3 
Report by Head of Finance
(Report No. 24/41) 
1. PURPOSE 
1.1 This report provides a summary position to date for the 5-year Composite
Capital Budget and the 5-year Housing Investment Programme for 2023/24 to
2027/28 and seeks approval for adjustments to the programmes. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
(i) notes the contents of the report.
(ii) approves the proposed adjustments to the five-year Composite Capital
Budget 2023/24 to 2027/28 set out in Sections 5 and 6 of the report
and summarised in Appendices I and II.
(iii) approves the proposed adjustments to the Housing Investment
Programme Budget 2023/24 to 2027/28 set out in Section 7 of the
report and summarised in Appendix III. 
3. STRUCTURE 
3.1 The report is structured over the following sections: 
• Section 4: Background / Main Issues
• Section 5: Composite Capital Programme – Gross Capital Resources
• Section 6: Composite Capital Programme – Expenditure
• Section 7: Housing Investment Programme
• Section 8: Summary 
4. BACKGROUND / MAIN ISSUES 
4.1 The Finance & Resources Committee approved an updated five-year gross
Composite Capital Budget for 2023/24 to 2027/28 totalling £623,484,000 and
a five-year gross Housing Investment Programme for 2023/24 to 2027/28
totalling £92,205,000 at its meeting on 22 November 2023 (report 23/316
refers). 
4.2 This report advises on expenditure to 30 November 2023, and the latest
estimate of the projected outturn for each of the years to 2027/28 for the
Composite Programme and for the Housing Investment Programme.
7
Page 105 of 146

Page 106

5. COMPOSITE CAPITAL PROGRAMME – GROSS CAPITAL RESOURCES 
5.1 The current estimated total gross capital resources (which includes
movements in Capital Receipts, Capital Grants, Contributions and borrowing)
available over the five years 2023/24 to 2027/28 amount to £623,916,000. 
5.2 Movements from the revised Composite Capital Budget approved on 22
November 2023 for the five years are summarised in the table below, and the
constituent elements for each year are shown in Appendix I. 
Total Gross Composite Capital Resources 
Approved 
22 November 2023
Current
Estimate
Movement 
£’000 £’000 £’000
2023/24 196,328 191,182 (5,146)
2024/25 201,340 199,095 (2,245)
2025/26 111,750 97,252 (14,498)
2026/27 65,582 72,809 7,227
2027/28 48,484 63,578 15,094
Total 623,484 623,916 432  
5.3 The overall movement in total Gross Resources for the 5 years 2023/24 to
2027/28 shown at Section 5.2 above can be summarised as follows: 
£’000
Increase in Ring-Fenced Receipts (Section 5.4) 9
Increase in Capital Grants (Section 5.5) 305
Increase in Third Party Contributions (Section 5.6)  57
Increase in Borrowing Requirement (Section 5.7 and 5.8) 61
Increase in Gross Capital Resources (Section 5.2) 432 
5.4 There has been some rephasing of General Fund and Commercial Property
receipts across the 5-year programme but no change to the overall totals
under each category. However, there is an increase in Ring-Fenced receipts
of £9,000 in the current year (disposal of recycling containers). 
5.5 The Scottish Government have announced the allocation of the Inspiring
School Age Childcare Spaces programme grant, with the Council being
allocated a Capital Grant of £105,000 in 2023/24 (Section 6.2.2 refers). In
addition, the Scottish Government has also allocated a further £200,000 in
2023/24 under the Cycling Walking & Safer Streets programme (Section 6.3.2
refers). 
5.6 Third Party Contributions have increased by £57,000 in 2023/24, relating to
Structural Maintenance (£28,000, Section 6.3.3 refers), Community
Greenspace (£4,000) and Property Compliance works at Perth Concert Hall
(£25,000). 
Page 106 of 146

Page 107

5.7 The projected borrowing requirement in 2023/24, which is effectively the
balancing item for resources, is £142,121,000. This is £4,628,000 lower than
the borrowing requirement approved by the Committee on 22 November
2023. 
5.8 The total new borrowing requirement in the subsequent years 2024/25 to
2027/28 has increased by £4,689,000 to £355,916,000, resulting in an overall
increase of £61,000 in the total level of borrowing across the whole 5-year
programme. The movement in borrowing is summarised as follows: 
2023/24 2024/25 2025/26 Later
Years
Total 
£’000 £’000 £’000 £’000 £’000
Increase in Prudential Borrowing –
Recycling Containers
Replacement Programme (net of
receipts) (Section 6.3.7)
46 15 0 0 61
Movements arising from re-
phasing of expenditure and
receipts (Appendix II)
(4,674) (2,159) (14,498) 21,331 0
Increase/(Decrease) in
Borrowing Requirement
(4,628) (2,144) (14,498) 21,331 61 
5.9 The chart below shows the Capital Resources required to fund the 2023/24
Composite Capital Programme following the proposed budget adjustments
detailed in this report. 
74.3%
21.7%
0.1%
1.5%
1.0%
1.4%
4.0%
Projected Capital Resources 2023/24
(December 2023)
Borrowing (£142.121M)
Grants (£41.479M)
Tay City Deal (£0.267M)
Developer Contributions (£2.847M)
Third Party & Revenue Contributions (£1.822M)
Receipts (£2.646M)
£Million
Page 107 of 146

Page 108

6. COMPOSITE CAPITAL PROGRAMME – EXPENDITURE 
6.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme 
6.1.1 Total expenditure (net of grants and contributions) to 30 November 2023 on
the Composite Capital Programme is detailed in Appendix II and summarised
as follows: 
Projected
Outturn
(£’000)
Net Expenditure
to 30 November
2023 (£’000)
% of
Projected
Outturn    
Education & Children’s Services  56,744 29,132 51%
Communities 102,371 55,050 54%
Health and Social Care 1,303    403 31%
Corporate & Democratic Services 9,382 3,828 41%
Total Net Capital Expenditure 169,800 88,413 52% 
6.1.2 A comprehensive monitoring exercise has been carried out, which is detailed
in Appendix II. The most significant features are discussed below. 
6.1.3 In common with all Scottish local authorities and public and private sector
bodies, the Council has experienced significant inflationary pressures on the
delivery of its Capital investment programme over the past few years. 
6.1.4 The Building Cost Information Service (BICS) publish well established cost
indices for the construction industry. The BCIS All-in Tender Price Index,
which shows the general movement on construction pricing, currently
forecasts a 4.0% increase in construction costs in the current year compared
to 9.4% last year, indicating a continuing slow down in construction inflation.
However, the current conflict in the Middle East may significantly impact both
haulage costs for raw materials and fuel costs and the situation will be kept
under review. 
6.2 Education and Children’s Services 
6.2.1 The Executive Director (Education & Children’s Services) has reviewed the
programme for their Service and proposes the following budget adjustments. 
6.2.2 The Scottish Government have provided a grant of £105,000 towards
Inspiring School Age Childcare Spaces with the expenditure budget for
Investment in the Learning Estate increased to reflect the funding. The grant
will be used to support projects which expand and improve school-age
childcare at Letham Primary School, Fairview School and also to support the
Westbank Outdoor Project. 
6.2.3 The remaining movements all reflect the realigning of existing budgets and
programmes of works, the most significant of which are summarised below: 
Page 108 of 146

Page 109

Project 2023/24
£’000
2024/25
£’000
Later
Years
£’000
Description
Blairgowrie
Recreation Centre
(950) 950 0 Rephasing of budget to align with
latest estimated cashflow from the
contractor. There is no change to
the planned completion date. 
New Primary School
at Bertha Park site
(500) (7,500) 8,000 Programme revised in line with
current/anticipated housebuilding
in the catchment area. Zoning of
some pupils may be required in
the intervening years. 
Perth Grammar
School
(620) 620 0 Planned works rephased by one
year to reflect diversion of
resources towards replacement of
Reinforced Autoclaved Aerated
Concrete (RAAC) roof during
2023. 
6.2.4 On 2 November 2022, the Learning and Families Committee approved the
catchment for a new primary school at Bertha Park site, with a target
completion date of August 2026. (Report No. 22/265 refers).   The Council
continues to analyse house building data in the catchment area and the
forecast pupil numbers generated from the new housing. Given the recent
economic slowdown in house building and the localised pupil numbers to
date, a review of the timescales associated with the need for a new primary
school in this area is being undertaken. The outcome of this review will be
reported to the Finance & Resources Committee at a future date. In the
meantime, the project’s budget has been rephased by 2 years pending the
outcome of the review with the recognition that there may be some additional
revenue costs from re-zoning pupils, where necessary, during this period. 
6.2.5 All of the above proposed adjustments have been reflected in Appendices I &
II. 
6.3 Communities 
6.3.1 The Executive Director (Communities) has reviewed the programme for their
Service and proposes various budget adjustments, the most significant of
which are described below. 
6.3.2 Within Traffic & Road Safety, the Scottish Government has provided
additional grant funding of £200,000 under the Cycling, Walking and Safer
Routes programme. It is proposed that this is allocated to the Schools Road
Safety Measures programme (£66,000) and the Cycling Walking & Safer
Routes programme (£134,000). Itis also proposed to move £119,000 of the
budget for the 20mph Signage Programme (Schools) from the current year to
next year to focus resources on the delivery of grant funded Road Safety
Measures. 
Page 109 of 146

Page 110

6.3.3 An additional £28,000 of Third-Party Contributions have been received
towards the Structural Maintenance programme in 2023/24. This comprises
£14,000 from the Forestry Commission for Timber Routes and £14,000
towards road adoption. 
6.3.4 Within Asset Management – Bridges, a review has been carried out to assess
the work that can be completed in the current year and future years with the
current staff capacity. Accordingly, it is proposed that the budgets for
Dalhenzean Culvert (£279,000) and Dunkeld Golf Course Bridge (£225,000)
are transferred back to the Bridge Refurbishment Programme, as there is
currently no work scheduled on these projects within the current capital
programme. It is, therefore, proposed to rephase a total of £498,000 across
the Bridge Refurbishment Programme as set out in the table below to better
reflect the ability for works to be scheduled: 
2023/24
£’000
2024/25
£’000
2025/26
£’000
2026/27
£’000
2027/28
£’000
(142) 245 126 127 (356) 
6.3.5 Within Improvement Schemes, it is proposed to transfer £190,000 from the
current year into next year, to allow a review of any further works required
once the A977/B9097 junction alignment works have been assessed for their
effectiveness. 
6.3.6 Within Other Planning Projects, it is proposed that the 2023/24 budget for
Perth Eco-Innovation Park of £3,000,000 is moved to next year as there is no
anticipated expenditure in the current year pending ongoing discussions with
the landowners. Consequently, the Tay Cities Deal funding of £990,000 also
needs to be re-phased. 
6.3.7 Within the Prudential Borrowing Projects budget, it is proposed to increase the
borrowing for Recycling Containers, Oil Banks & Battery Banks by £70,000
over this year and next year to purchase additional skips and cardboard
compactors to facilitate the twin stream recycling project. This is offset by an
increase of £9,000 in the income received from the disposal of replaced
containers, which reduces the required increase in borrowing. 
6.3.8 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I & II. 
6.4 Corporate & Democratic Services 
6.4.1 The Chief Operating Officer has reviewed the programme for their Service.
There are only small movements proposed, and these have been reflected in
Appendix II. 
7. HOUSING INVESTMENT PROGRAMME 
7.1  The total current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2023/24 to 2027/28 remains
unchanged at £92,205,000. Movements from the previous estimates
Page 110 of 146

Page 111

approved by the Committee on 22 November 2023 are summarised in the
table below and detailed in Appendix III. 
Approved 
22 November
2023
Current
Estimate
Movement 
£’000 £’000 £’000
2023/24 22,238 18,738 (3,500)
2024/25          13,503        18,831 5,328
2025/26 17,253 17,248 (5)
2026/27 17,644 16,283 (1,361)
2027/28 21,567  21,105  (462)
Total 92,205 92,205 0 
Total Expenditure to 30 November 2023 (Housing Investment Programme) 
7.2 Net expenditure for 2023/24 to 30 November 2023 amounts to £12,454,000
and receipts amount to £8,000. Therefore, the borrowing requirement for the
year to date is £12,446,000. 
7.3 The Executive Director (Communities) has reviewed the Housing Investment
Programme and proposes the budget adjustments outlined below.
7.4 It is proposed to transfer £462,000 from the New Build Future Developments
Budget in 2027/28 to the Council House Buy-Back programme in 2023/24 to
reflect the additional properties being purchased in the current year. This
exceeds the target of 30 properties to be purchased this year. 
7.5 Phase 4 of the Central Heating programme is concluding with Phase 5 now
due to commence. In order to facilitate this, it is proposed to re-allocate
amounts from the Scottish Housing Quality Standard (SHQS) Future
Developments budget to the Central Heating budget with phasing as follows: 
2023/24
£’000
2024/25
£’000
2025/26
£’000
2026/27
£’000
Central Heating 71 620 620 811
SHQS Future
Developments
0 0 0 (2,122)
7.6 Based on the number of installations now expected within the Energy
Efficiency measures programme, it is proposed that £625,000 of the budget is
accelerated from 2025/26 and £45,000 is accelerated from 2024/25 into the
current year (£670,000). 
7.7 Delays have arisen in commencing the contract for works on Multi-Storey
Flats with improvement works unlikely to start in the current year due to the
significant investigatory work required to ensure the works meet new climate
change targets and to allow for a full scope of works to be established. It is,
therefore, proposed that £1,815,000 of this budget is moved into next year. 
Similarly, the only costs anticipated to be incurred in the current year towards
the St Catherine’s Square Redevelopment are professional fees, and it is
proposed that the remainder of the budget (£2,975,000) is moved from the
current year to next year. 
Page 111 of 146

Page 112

7.8 The remaining minor budget adjustments are proposed: 
Project 2023/24
£’000
2024/25
£’000
Later
Years
£’000
Description
General Capital Works 50 0 0 Fund the cost of Alyth
Pumping Station and
Rorrie Terrace adoption
works from SHQS Future
Developments budget.
SHQS Future
Developments
0 0 (50)
Lynedoch Road New
Builds
37 0 0 Fund additional works
instructed throughout the
construction at Lynedoch
Road from New Build
Future Developments
budget.
New Build Future
Development 
0 (37) 0 
7.9 The above proposed adjustments do not impact the borrowing requirement
over the 5-year programme. However, there is an increase in capital receipts
of £8,000 in the current year, therefore, the total borrowing requirement has
reduced by this amount to £80,704,000. 
8. BUDGET OVERVIEW 
8.1 The projected net expenditure outturn in 2023/24 for the Composite Capital
Budget is £169,800,000 and represents 95% of the original 2023/24 budget
approved on 26 April 2023 (£178,033,000). The revised budget is based on
the latest projections of expenditure and all budget adjustments outlined within
this report. 
8.2 Net expenditure to 30 November 2023 on the Composite Capital Budget is
£88,413,000 and represents 52% of the proposed revised budget for 2023/24
of £169,800,000. This level of expenditure is higher than normal at this stage
of the financial year, and reflects several large projects currently on-site,
notably Destiny Bridge (formerly the Cross Tay Link Road project); the Perth
High School replacement project and Blairgowrie Recreation Centre. 
8.3 The projected net expenditure outturn in 2023/24 for the Housing Investment
Programme is £18,738,000 and represents 92% of the original 2023/24
budget approved on 26 April 2023 (£20,422,000). The reduction reflects the
rephasing of expenditure on the Multi-Storey Flats and St. Catherines
Redevelopment projects from the current year into 2024/25. 
8.4 Net expenditure to 30 November 2023 on the Housing Investment Programme
is £12,454,000 which represents 66% of the proposed revised budget for
2023/24 of £18,738,000. 
8.5 The Council’s total Borrowing Requirement to 30 November 2023, based on
the Composite and Housing Investment Programmes, is £85,721,000. The
estimated overall Council Borrowing Requirement for 2023/24 as a whole has
reduced by £8,136,000 to £158,796,000 as a result of the monitoring
Page 112 of 146

Page 113

adjustments reflected within this report. Over the whole 5-year programme,
there is only a small increase of £61,000 in the overall level of borrowing,
relating to Communities Prudential Borrowing projects. 
8.6 While the projections have been based on a comprehensive monitoring
exercise, they continue to remain subject to uncertainty due to ongoing
inflationary pressures in the current economic environment. 
Author(s)
Name  Designation Contact Details
John Jennings Senior Accountant  CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date
Stewart MacKenzie  Head of Finance  18 January 2024
Clare Mailer Director (Strategy, People &
Resources) 
Page 113 of 146

Page 114

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 114 of 146

Page 115

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Chief Executive and the Executive Directors have been consulted in the
preparation of this report.   
Page 115 of 146

Page 116

2. BACKGROUND PAPERS 
No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix I – Composite Capital Programme - Estimated Capital
Resources 2023/24 to 2027/28
• Appendix II – Composite Capital Programme - Summary of Capital
Resources and Expenditure 2023/24 to 2027/28        
• Appendix III – HRA Capital Investment Programme – Summary of
Capital Resources and Expenditure 2023/24 to 2027/28 
• Appendix IV – Significant Capital Projects Progress Update
Page 116 of 146

Page 117

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2023/24 to 2027/28
APPENDIX I
Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources
2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget
Capital Grants
Cycling, Walking & Safer Routes (CWSR) 1,312 200 200 200 200 2,112
Recycling Improvement Fund 2,363 0 0 0 0 2,363
Cross Tay Link Road - Transport Scotland 15,000 0 0 0 0 15,000
Inspiring School Age Childcare Spaces 105 0 0 0 0 105
General Capital Grant 22,699 13,847 12,639 12,150 12,150 73,485
Total Capital Grants 41,479 14,047 12,839 12,350 12,350 93,065
General Capital Receipts
General Fund - Capital Receipts 504 278 694 250 250 1,976
General Fund - Ring Fenced Receipts 513 352 352 902 1,047 3,166
Total General Capital Receipts 1,017 630 1,046 1,152 1,297 5,142
Commercial Property Receipts
Capital Receipts brought-forward 2,245 616 1,120 1,550 1,550 2,245
Commercial Property Capital Receipts 0 712 430 0 1,088 2,230
Capital Receipts carried-forward (616) (1,120) (1,550) (1,550) (2,638) (2,638)
Total Commercial Property Receipts Applied 1,629 208 0 0 0 1,837
Contributions
Tay Cities Deal 267 999 550 505 2,946 5,267
Third Party Contributions 1,730 658 0 2,000 3,000 7,388
Developer Contributions 2,847 2,300 2,367 2,600 2,600 12,714
Revenue Budget Contributions 92 124 125 125 0 466
Total Contributions 4,936 4,081 3,042 5,230 8,546 25,835
Capital Borrowing Requirement 142,121 180,129 80,325 54,077 41,385 498,037
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 191,182 199,095 97,252 72,809 63,578 623,916
7
Page 117 of 146

Page 118

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2023/24 to 2027/28
APPENDIX I
Movements in Resources from Approved Budget - 22 November 2023
Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget
2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000
Increase/(Decrease) in:
Capital Receipts - General Fund 101 (101) 0 0 0 0
Capital Receipts - Commercial Property 0 0 (845) 0 845 0
Capital Receipts - Ring Fenced 9 0 0 0 0 9
Capital Grants:
Cycling, Walking & Safer Routes (CWSR) 200 0 0 0 0 200
Road Safety Improvement Fund 0 0 0 0 0 0
Regeneration Fund 0 0 0 0 0 0
Recycling Improvement Fund 0 0 0 0 0 0
Cross Tay Link Road - Transport Scotland 0 0 0 0 0 0
Inspiring School Age Childcare Spaces 105 0 0 0 0 105
General Capital Grant 0 0 0 0 0 0
Tay Cities Deal (990) 0 0 0 990 0
Third Party Contributions 57 0 0 0 0 57
Revenue Contributions 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0
Resources b/f 0 0 0 (845) (845) (1,690)
Resources c/f to future years 0 0 845 845 0 1,690
Borrowing Requirement (4,628) (2,144) (14,498) 7,227 14,104 61
Total Increase/(Decrease) in Resources (5,146) (2,245) (14,498) 7,227 15,094 432
Approved Resources 22 November 2023 196,328 201,340 111,750 65,582 48,484 623,484
Revised Resources 191,182 199,095 97,252 72,809 63,578 623,916
Page 118 of 146

Page 119

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Revised Actuals Projected Approved Proposed Revised Approved Proposed Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 30-Nov-23 Adjustment Adjustment
Report 2 Report 3 Report 3 Report 2 Report 3 Report 3 Report 2 Report 3 Report 3
2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES 58,846 (2,102) 56,744 29,132 56,744 68,894 (5,898) 62,996 41,553 (14,500) 27,053
COMMUNITIES 104,746 (2,375) 102,371 55,050 102,371 116,845 3,653 120,498 59,191 2 59,193
HEALTH AND SOCIAL CARE 1,303 0 1,303 403 1,303 2,098 0 2,098 1,303 0 1,303
CORPORATE AND DEMOCRATIC SERVICES 9,432 (50) 9,382 3,828 9,382 11,170 0 11,170 8,476 0 8,476
TOTAL NET EXPENDITURE 174,327 (4,527) 169,800 88,413 169,800 199,007 (2,245) 196,762 110,523 (14,498) 96,025
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (22,699) 0 (22,699) (14,760) (22,699) (13,847) 0 (13,847) (12,639) 0 (12,639)
DEVELOPER CONTRIBUTIONS (2,847) 0 (2,847) 0 (2,847) (2,300) 0 (2,300) (2,367) 0 (2,367)
CAPITAL RECEIPTS (403) (101) (504) 1 (504) (1,091) 101 (990) (1,969) 845 (1,124)
ANNUAL BORROWING REQUIREMENT 148,378 (4,628) 143,750 73,654 143,750 181,769 (2,144) 179,625 93,548 (13,653) 79,895
CAPITAL RECEIPTS BROUGHT FORWARD (2,245) 0 (2,245) (2,245) (2,245) (616) 0 (616) (1,120) 0 (1,120)
CAPITAL RECEIPTS CARRIED FORWARD 616 0 616 1,866 616 1,120 0 1,120 2,395 (845) 1,550
TOTAL NET BORROWING REQUIREMENT 146,749 (4,628) 142,121 73,275 142,121 182,273 (2,144) 180,129 94,823 (14,498) 80,325
7
Page 119 of 146

Page 120

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
EDUCATION AND CHILDREN'S SERVICES
COMMUNITIES
HEALTH AND SOCIAL CARE
CORPORATE AND DEMOCRATIC SERVICES
TOTAL NET EXPENDITURE
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT
DEVELOPER CONTRIBUTIONS
CAPITAL RECEIPTS
ANNUAL BORROWING REQUIREMENT
CAPITAL RECEIPTS BROUGHT FORWARD
CAPITAL RECEIPTS CARRIED FORWARD
TOTAL NET BORROWING REQUIREMENT
Approved Proposed Revised Approved Proposed Revised Revised
Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment
Report 2 Report 3 Report 3 Report 2 Report 3 Report 3 Report 3
2026/27 2026/27 2026/27 2027/28 2027/28 2027/28
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
14,804 7,100 21,904 6,823 15,400 22,223 190,920
38,303 127 38,430 27,026 (1,346) 25,680 346,172
1,303 0 1,303 1,319 0 1,319 7,326
7,440 0 7,440 7,113 50 7,163 43,631
61,850 7,227 69,077 42,281 14,104 56,385 588,049
(12,150) 0 (12,150) (12,150) 0 (12,150) (73,485)
(2,600) 0 (2,600) (2,600) 0 (2,600) (12,714)
(250) 0 (250) (493) (845) (1,338) (4,206)
46,850 7,227 54,077 27,038 13,259 40,297 497,644
(2,395) 845 (1,550) (2,395) 845 (1,550) (2,245)
2,395 (845) 1,550 2,638 0 2,638 2,638
46,850 7,227 54,077 27,281 14,104 41,385 498,037
Page 120 of 146

Page 121

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment 30-Nov-23
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES
MIS - SEEMIS Licensing 745 745 147 745 0 0 0 0 745
Blairgowrie Recreation Centre - Replacement 17,324 (950) 16,374 8,153 16,374 13,150 4,003 0 0 33,527
Schools Modernisation Programme
Investment in the Learning Estate 1,386 105 1,491 1,143 1,491 10,388 8,550 8,650 6,823 35,902
Scottish Govt. Grant (Inspiring School Age Childcare Spaces) 0 (105) (105) (105) 0 0 0 0 (105)
Free School Meal Expansion Programme 1,348 1,348 1,348 2,000 0 0 0 3,348
Methven Primary School Refurbishment 124 124 26 124 140 0 0 0 264
Breadalbane Academy, Aberfeldy - 3G Pitch 29 29 28 29 0 0 0 0 29
Third Party Contribution (The Scottish Football Association) (29) (29) (14) (29) 0 0 0 0 (29)
Kirkmichael Primary School Upgrades 32 (32) 0 0 32 0 0 0 32
Capital Receipt (ring-fenced) (128) (128) (127) (128) 0 0 0 0 (128)
Early Learning & Childcare 0 0 0 0 0 0 0 0
- Oakbank Primary School Upgrade Project 12 12 12 12 0 0 0 0 12
- Rattray Primary School Upgrade Project 155 155 91 155 0 0 0 0 155
New Primary School at Bertha Park Site 1,059 (500) 559 377 559 0 500 7,500 15,400 23,959
Riverside Primary New School 3,410 3,410 2,496 3,410 0 0 0 0 3,410
Technology Upgrades 128 128 17 128 1,016 250 0 0 1,394
Perth Academy - Refurbishment 2,311 2,311 2,063 2,311 2,500 1,650 1,650 0 8,111
Perth Grammar School - Upgrade Programme Phase 3 1,469 (620) 849 541 849 2,120 1,500 504 0 4,973
Perth High School - Internal Services & Refurbishment 16 16 4 16 0 0 0 0 16
Perth High School - New School Investment 25,244 25,244 10,428 25,244 31,500 10,600 3,600 0 70,944
Harris Academy/Invergowrie - Extension 4,211 4,211 3,747 4,211 150 0 0 0 4,361
TOTAL: EDUCATION AND CHILDREN'S SERVICES 58,846 (2,102) 56,744 29,132 56,744 62,996 27,053 21,904 22,223 190,920
COMMUNITIES
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..) 0 0 0 446 362 362 361 1,531
Additional Road Safety - Pedestrian Crossings 0 0 0 175 175 175 0 525
Schools Road Safety Measures 422 66 488 360 488 0 0 0 0 488
Scottish Government Grant - CWSS 0 (66) (66) (66) 0 0 0 0 (66)
20mph Signage Programme - Schools 129 (119) 10 1 10 119 0 0 0 129
20mph Signage Programme 76 76 32 76 0 0 0 0 76
Cycling Walking & Safer Routes (CWSR) 1,262 134 1,396 509 1,396 200 200 200 200 2,196
Scottish Government Grant - CWSR (1,112) (134) (1,246) (208) (1,246) (200) (200) (200) (200) (2,046)
Third Party Contribution (TACTRAN) (150) (150) (150) 0 0 0 0 (150)
Car Parking Investment 356 356 180 356 0 0 0 0 356
Revenue Contribution (65) (65) (65) (65) 0 0 0 0 (65)
Car Parking Investment - Pitlochry 0 0 0 150 0 0 0 150
Strathmore Cycle Network 0 0 0 0 0 0 0 0
Sub-Total 918 (119) 799 809 799 890 537 537 361 3,124
Asset Management - Roads & Lighting
Structural Maintenance 12,086 28 12,114 8,419 12,114 9,498 9,498 9,706 7,500 48,316
Third Party Contribution (Forestry Commission Timber Routes) (285) (14) (299) (298) (299) 0 0 0 0 (299)
Third Party Contribution 0 (14) (14) (14) (14) 0 0 0 0 (14)
Traffic Signal Renewals - Upgrading 73 73 73 0 0 0 0 73
Footways 538 40 578 494 578 410 370 410 410 2,178
Investment in Local Footpaths 0 0 0 0 100 100 0 200
Road Safety Barriers 22 22 22 0 0 0 0 22
Sub-Total 12,434 40 12,474 8,601 12,474 9,908 9,968 10,216 7,910 50,476
Asset Management - Bridges
Bridge Refurbishment Programme 1,657 (121) 1,536 552 1,536 2,458 1,914 2,213 2,897 11,018
Dalhenzean Culvert 15 (15) 0 0 0 0 0 0 0
Dunkeld Golf Course 6 (6) 0 0 0 0 0 0 0
Vehicular Bridge Parapets Programme - Assess & Upgrade 0 0 1 0 29 0 0 0 29
Old Perth Bridge - Strengthening 190 190 190 10 2,369 0 0 2,569
Perth Queens Bridge - Strengthening 335 335 335 60 70 2,153 0 2,618
Garry Viaduct 110 110 110 300 300 1,900 1,790 4,400
Culteuchar Culvert 391 391 82 391 0 0 0 0 391
Tullyfergus Bridge 0 0 0 0 0 0 0 0
Sub-Total 2,704 (142) 2,562 635 2,562 2,857 4,653 6,266 4,687 21,025
Improvement Schemes
A9/A85 Road Junction Improvements 270 270 41 270 0 0 0 0 270
Cross Tay Link Road (CTLR) 72,842 72,842 37,539 72,842 26,213 0 0 0 99,055
Scottish Government Grant (15,000) (15,000) (15,000) 0 0 0 0 (15,000)
A977 Upgrades 540 (190) 350 201 350 190 0 0 0 540
Brioch Road, Crieff - Road Realignment & Safety Measures 31 31 31 0 0 0 0 31
Sub-Total 58,683 (190) 58,493 37,781 58,493 26,403 0 0 0 84,896
Public Transport
Community Transport Iniaitives 199 199 199 0 0 0 0 199
Sub-Total 199 0 199 0 199 0 0 0 0 199
Rural Flood Protection Schemes
Almondbank Flood Protection Scheme 17 17 13 17 0 0 0 0 17
Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 354 354 7 354 0 0 0 0 354
Comrie Flood Protection Scheme 7,385 7,385 434 7,385 16,841 0 0 0 24,226
Milnathort Flood Protection Scheme 79 79 79 1,590 0 0 0 1,669
South Kinross Flood Protection Scheme 225 225 133 225 1,168 1,787 0 0 3,180
Scone Flood Protection Scheme 90 90 90 76 601 0 0 767
Coastal Change Adaptation 100 100 100 0 0 0 0 100
Sub-Total 8,250 0 8,250 587 8,250 19,675 2,388 0 0 30,313
Perth & Kinross Place-making
Mill Street Environmental Improvements 127 127 50 127 0 0 0 0 127
Perth, Place, People 3,598 3,598 3,598 0 0 0 0 3,598
Perth City Centre Golden Route (Rail Station) 11 11 11 11 0 0 0 0 11
City Greening 31 31 31 0 0 0 0 31
Perth & Kinross Lighting Action Plan 1,071 1,071 246 1,071 677 0 0 0 1,748
Sub-Total 4,838 0 4,838 307 4,838 677 0 0 0 5,515
Other Planning Projects
Creative Exchange (former St. John's Primary School) 53 53 53 0 0 0 0 53
Local Full Fibre Network 22 22 4 22 0 0 0 0 22
Third Party Contribution - Tay Cities Deal 0 0 (53) 0 0 0 0 0 0
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 429 429 425 429 0 0 0 0 429
Third Party Contribution - ERDF (162) (162) (6) (162) 0 0 0 0 (162)
Third Party Contribution - Tay Cities Deal (267) (267) (267) 0 0 0 0 (267)
Perth Eco-Innovation Park at Perth West 3,000 (3,000) 0 0 23,800 9,017 0 0 32,817
Third Party Contributions - Tay Cities Deal (990) 990 0 0 (999) (550) (505) (2,946) (5,000)
Other Third Party Contributions 0 0 0 0 0 (2,000) (3,000) (5,000)
Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 0 (550) (725) (1,275)
Nature Restoration 386 386 11 386 0 0 0 0 386
Sub-Total 2,471 (2,010) 461 381 461 22,801 8,467 (3,055) (6,671) 22,003
Page 121 of 146

Page 122

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment 30-Nov-23
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
City Centre Developments - Cultural Attractions
Perth Museum 2,368 2,368 1,303 2,368 0 0 0 0 2,368
Perth Art Gallery 3,272 3,272 10 3,272 0 0 0 0 3,272
PH2O 0 0 0 30,000 25,000 20,000 15,000 90,000
Sub-Total 5,640 0 5,640 1,313 5,640 30,000 25,000 20,000 15,000 95,640
Community Planning
Letham Community Wellbeing Hub 1,571 1,571 1,048 1,571 0 0 0 0 1,571
Third Party Contribution (Letham4All) (519) (519) (519) 0 0 0 0 (519)
Sub-Total 1,052 0 1,052 1,048 1,052 0 0 0 0 1,052
Community Greenspace
Play Areas - Improvements Implementation Strategy 383 383 50 383 963 611 150 150 2,257
Third Party Contribution (10) (10) (6) (10) 0 0 0 0 (10)
3G Pitch, Blairgowrie 3 3 3 3 117 0 0 0 120
Settlement/Neighbourhood Parks 25 25 25 379 0 0 0 404
Countryside Sites 0 0 0 139 0 0 0 139
Community Greenspace Sites 0 0 1 0 627 682 682 678 2,669
Community Greenspace Bridges 27 27 9 27 31 0 0 0 58
Core Path Implementation 9 9 3 9 0 0 0 0 9
Third Party Contribution (21) (21) (21) 0 0 0 0 (21)
Premier Parks 8 8 8 0 0 0 0 8
Auchterarder Public Park 30 30 19 30 0 0 0 0 30
Revenue Contribution 0 0 0 0 0 0 0 0
The Knock 0 0 0 0 0 0 0 0
Third Party Contribution (3) (3) (3) 0 0 0 0 (3)
Kinnoull Hill 4 4 8 8 0 0 0 0 8
Third Party Contribution 0 (4) (4) (7) (4) 0 0 0 0 (4)
Cemetery Extensions 20 20 16 20 60 229 225 375 909
Sub-Total 475 0 475 88 475 2,316 1,522 1,057 1,203 6,573
Waste Strategy
Recycling Improvement Fund 2,363 2,363 1,847 2,363 0 0 0 0 2,363
Scottish Government Grant (2,363) (2,363) (21) (2,363) 0 0 0 0 (2,363)
Sub-Total 0 0 0 1,826 0 0 0 0 0 0
Support Services
PC Replacement & IT Upgrades
Hardware 16 16 4 16 15 15 14 14 74
Licenses 152 152 65 152 112 95 71 71 501
Sub-Total 168 0 168 69 168 127 110 85 85 575
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units 57 57 57 0 0 0 0 57
Broxden Business Park - Additional Infrastructure 10 10 10 0 0 0 0 10
Western Edge, Kinross - Site Servicing 5 5 5 0 0 0 0 5
Broxden Drainage Mitigation Works 638 638 371 638 866 0 0 0 1,504
Third Party Contribution (Scottish Water) (470) (470) (470) (658) 0 0 0 (1,128)
Ruthvenfield Business Centre 1,372 1,372 8 1,372 0 0 0 0 1,372
North Muirton Drainage 17 17 17 0 0 0 0 17
Sub-Total 1,629 0 1,629 379 1,629 208 0 0 0 1,837
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins 203 203 63 203 200 200 200 200 1,003
Wheeled Bin Replacement Programme - Commercial Bins 208 208 208 20 20 20 20 288
Recycling Containers, Oil Banks & Battery Banks Replacement Pro 150 55 205 41 205 80 65 65 65 480
Capital Receipts - Disposals 0 (9) (9) (6) (9) 0 0 0 0 (9)
Litter Bins 25 25 25 25 50 50 50 50 225
Smart Cities - Smart Waste 45 45 72 45 0 0 0 0 45
Third Party Contribution (ERDF) (24) (24) (24) 0 0 0 0 (24)
Vehicle Replacement Programme 3,813 3,813 742 3,813 2,800 2,800 2,800 2,500 14,713
Capital Receipts - Vehicle Disposals (376) (376) (154) (376) (352) (352) (352) (322) (1,754)
Street Lighting Renewal - LED & Column Replacement 804 804 431 804 888 825 541 592 3,650
LED Traffic Signal Replacement 4 4 4 4 0 0 0 0 4
Almondbank Flood Protection Scheme 3 3 3 0 0 0 0 3
Land Purchase & Development (Hotel Development) 0 0 0 950 950 0 0 1,900
Sub Total 4,855 46 4,901 1,218 4,901 4,636 4,558 3,324 3,105 20,524
Housing Projects
Gypsy Travellers Site Improvement Works 195 195 195 0 0 0 0 195
Additional Gypsy Traveller Site Improvement Works 225 225 8 225 0 0 0 0 225
Scottish Government Grant 0 0 0 0 0 0 0 0
New Gypsy Traveller Site 10 10 10 0 1,990 0 0 2,000
Sub Total 430 0 430 8 430 0 1,990 0 0 2,420
TOTAL: COMMUNITIES 104,746 (2,375) 102,371 55,050 102,371 120,498 59,193 38,430 25,680 346,172
Health & Social Care
Occupational Therapy Equipment 250 250 250 250 250 250 250 1,250
Technology Enabled Telecare 1,000 1,000 403 1,000 1,537 1,000 1,000 1,000 5,537
Moving & Handling Office Refurbishment 0 0 0 29 0 0 0 29
Software Licences 53 53 53 53 53 53 69 281
Developing Supported Tenancies 0 0 0 229 0 0 0 229
TOTAL: HEALTH & SOCIAL CARE 1,303 0 1,303 403 1,303 2,098 1,303 1,303 1,319 7,326
CORPORATE AND DEMOCRATIC SERVICES
Property Services
DDA Adaptation & Alteration Works Programme 410 410 238 410 200 200 200 200 1,210
Property Compliance Works Programme 877 25 902 189 902 400 650 650 650 3,252
Third Party Contribution (LAL) 0 (25) (25) (25) (25) 0 0 0 0 (25)
Capital Improvement Projects Programme 2,275 2,275 968 2,275 1,800 1,800 1,800 894 8,569
Pitlochry High School - Upgrade Programme 316 316 106 316 0 0 0 0 316
Energy Efficiency Works - Various Properties 27 27 27 27 0 0 0 0 27
Revenue Contribution (Salix Reserve) (27) (27) (27) 0 0 0 0 (27)
Decarbonisation - Prudential Borrowing Programme (PB) 700 700 86 700 1,300 0 0 0 2,000
Energy Conservation & Carbon Reduction Programme (PB) 138 138 42 138 150 150 150 150 738
Information Systems & Technology
ICT Infrastructure Replacement and Upgrade Programme 2,416 2,416 1,665 2,416 4,207 4,079 3,017 2,903 16,622
Data & Analytics 600 600 205 600 839 738 761 784 3,722
Supporting Digital 750 750 32 750 855 878 901 926 4,310
Software Licences (Revenues & Benefits) 50 50 52 50 51 51 51 51 254
School Audio-Visual (AV) Equipment Replacement Programme 100 (50) 50 26 50 173 35 35 605 898
Mosaic - Swift Social Work System Replacement 800 800 217 800 1,319 20 0 0 2,139
Revenue Contribution 0 0 0 (124) (125) (125) 0 (374)
TOTAL: CORPORATE AND DEMOCRATIC SERVICES 9,432 (50) 9,382 3,828 9,382 11,170 8,476 7,440 7,163 43,631
TOTAL COMPOSITE NET EXPENDITURE 174,327 (4,527) 169,800 88,413 169,800 196,762 96,025 69,077 56,385 588,049
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
Page 122 of 146

Page 123

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment 30-Nov-23
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
CAPITAL RECEIPTS
General Capital Grant - Scottish Government (22,699) (22,699) (14,760) (22,699) (13,847) (12,639) (12,150) (12,150) (73,485)
Developer Contributions (2,847) (2,847) (2,847) (2,300) (2,367) (2,600) (2,600) (12,714)
General Fund - Capital Receipts/Disposal (403) (101) (504) 1 (504) (278) (694) (250) (250) (1,976)
Commercial Property - Capital Receipts/Disposal 0 0 0 0 0 (712) (430) 0 (1,088) (2,230)
Total: Capital Receipts (25,949) (101) (26,050) (14,759) (26,050) (17,137) (16,130) (15,000) (16,088) (90,405)
Annual Composite Borrowing Requirement 148,378 (4,628) 143,750 73,654 143,750 179,625 79,895 54,077 40,297 497,644
CAPITAL RECEIPTS BROUGHT FORWARD (2,245) 0 (2,245) (2,245) (2,245) (616) (1,120) (1,550) (1,550) (2,245)
CAPITAL RECEIPTS CARRIED FORWARD 616 0 616 1,866 616 1,120 1,550 1,550 2,638 2,638
TOTAL NET COMPOSITE BORROWING REQUIREMENT146,749 (4,628) 142,121 73,275 142,121 180,129 80,325 54,077 41,385 498,037
Page 123 of 146

Page 124

EDUCATION AND CHILDREN'S SERVICES
Project Project Description
MIS - Procurement & Integration Schools Management Information System
MIS - SEEMIS Licensing Licencing of Schools Management Information System
Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie
Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our
existing school estate
Free School Meal Expansion Programme Upgrading kitchen and dining facilities to provide the enhanced
Free School Meals programme
Methven Primary School Refurbishment Upgrade of Methven Primary School facilities
Breadalbane Academy, Aberfeldy - 3G Pitch Additional investment required to upgrade 2G to 3G
Kirkmichael Primary School Upgrades Upgrade of Kirkmichael Primary School facilities
Early Learning & Childcare
- Letham Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure -
Completed
- Oakbank Primary School Upgrade Project 1140 hrs project - Completed
- Rattray Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure -
Completed
New Primary School at Bertha Park Site New primary school located at Bertha Park
Riverside Primary New School Replacement of North Muirton and Balhousie primary schools
Technology Upgrades Upgrade to practical teaching environment within the existing
school estate
Perth Academy - Refurbishment
Investment to upgrade the infrastructure and environment of the
Perth Academy including structural work to sports block, lighting
upgrades, classroom upgrades and science block cladding
Perth Grammar School - Upgrade Programme Phase
3
Investment to upgrade the infrastructure and environment of the
Perth Grammar School including structural work to assembly hall,
AV and WiFi upgrades, classroom refurbishment and door
upgrades
Perth High School - Internal Services &
Refurbishment
Necessary works to the infrastructure and environment of the
current Perth High School
Perth High School - New School Investment Replacement of the existing Perth High School
Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy
in Dundee for continuation of access for pupils based in
Invergowrie
COMMUNITIES
Project Project Description
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety
Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities
Road Safety Improvement Fund works Provision of safety barriers on routes where motor cycling is
common
Schools Road Safety Measures A programme of works to improve road safety in the vicinity of
schools
20mph Signage Programme - Schools A programme of works to improve road safety in the vicinity of
schools
20mph Signage Programme A programme of works to introduce 20mph speed limits.
Cycling Walking & Safer Routes (CWSR) A programme of works providing infrastructure for cycling, walking
and safer routes
Car Parking Investment Construction of new car park in Auchterarder
Car Parking Investment - Pitlochry Purchase of land and construction of a public car park
Strathmore Cycle Network Contribution towards a shared use path between Coupar Angus
and Blairgowrie
Page 124 of 146

Page 125

Community Transport Iniatives
Funded by the Community Bus Fund - expenditure to improve
connectivity and integrate transport modes,or to support innovative
transport solutions in areas of rural deprivation
Structural Maintenance
Road maintenance to extend the life of roads, including
predominately road resurfacing, surface dressings, installing new
drainage infrastructure and repairs to and replacement of
defective embankments and retaining walls
Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal
infrastructure
Footways Replacement of existing  deteriorated footway surfaces
Investment in Local Footpaths A programme of works to improve and provide local footpaths
Road Safety Barriers
Renewal of existing barriers where unrecoverable damage has
occurred and renewal of barriers where timber posts have been
used in construction
Bridge Refurbishment Programme
Used to appoint specialist external inspection teams and
consultants to carry out specialist access bridge inspections and
assessments
Dalhenzean Culvert Culvert replacement project (later years)
Dunkeld Golf Course Culvert replacement project (later years)
Vehicular Bridge Parapets Programme - Assess &
Upgrade Assessment and Upgrading of Vehicle Parapets Programme
Old Perth Bridge - Strengthening
Carry out works recommended by the 2018 Bridge Assessment
study, including a range of assessment, investigation,
strengthening and improvement works
Perth Queens Bridge - Strengthening
Carry out works recommended by the 2018 Bridge Assessment
study, including a range of assessment, investigation,
strengthening and improvement works
Garry Viaduct
Replacement of Bearings and Parapets; including strengthening of
deck for bearing replacement jacking up, and to cater for
increased parapet vehicular deterrent capacity
Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert
Glendevon Bridge Major bridge repair works required due to severe river scour
damage (now complete)
Tullyfergus Bridge Installation of scour protection to protect existing bridge abutments
(later years)
A9/A85 Road Junction Improvements
New infrastructure including a new A9 overbridge, a bridge over
the River Almond and road linking the A85 to Inveralmond and
Bertha Park (Phase 1 of Perth Transport Futures Project) -
complete
Cross Tay Link Road (CTLR)
New road and major structure over the River Tay, linking the A9
north of Inveralmond and the A94 north of Scone (Phase 2 of
Perth Transport Futures Project).
A977 Upgrades A programme of works to improve road safety along the A977.
Broich Road, Crieff - Road Realignment & Safety
Measures Complete
Almondbank Flood Protection Scheme Substantially complete
Perth Flood Protection Scheme (Pump Replacement) Complete
Perth Flood Protection Scheme (South Inch Culvert
Reinstatement)
Ground investigation and monitoring then design project to
refurbish existing culvert
Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in Comrie
Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in Milnathort
Asset Management - Roads & Lighting
Asset Management - Bridges
Improvement Schemes
Rural Flood Protection Schemes
Page 125 of 146

Page 126

South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in South Kinross
Scone Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in Scone
Coastal Change Adaptation Design and construct projects to deal with incidents of coastal
erosion
Mill Street Environmental Improvements
Potential compensation payments associated with claims against
compulsory land acquisition to enable delivery of environmental
improvements to stimulate and support development and
investment
Perth, Place, People
Design and development of sustainable transport corridors to
improve access to and from Perth and enable additional
development and improvement within Perth city centre
Perth City Centre Golden Route (Rail Station)
Design and development of improvements to access, signage and
animation from rail and bus station to Perth city centre to
complement improvements to integration of transport
City Greening
Improvements to support enhancement of retail trading
environment and residential areas and enhanced use of space for
markets, events and alfresco use
Perth & Kinross Lighting Action Plan
Architectural and creative lighting to enhance city and towns
appearance, reduce energy cost and increase safety at nighttime
to increase dwell time, support the hospitality sector, events and
grow the evening economy
Creative Exchange (former St. John's Primary
School)
Repurposing old school to offer space to creative industry
businesses and create the Famous Grouse Idea Centre, a space
to support business innovation.  Complete
Town Centre - Regeneration & Economic
Improvements Complete
Local Full Fibre Network
Provision of gigabit fibre connectivity to Council's buildings to
unlock gigabit connectivity for surrounding communities.
Completed
Low Carbon Transport & Active Travel Hub - Broxden
EV Chargers
Provision of fast EV chargers combined with solar power
generation and battery storage at Broxden Park & Ride - Near
completion
Perth Eco-Innovation Park at Perth West
Provision of enabling infrastructure (access road, A9 underpass
and unit platforms) to develop 25ha of employment land
supporting clean growth, business innovation and jobs - Phase 1
(11ha) - In development
Coupar Angus - Strathmore Community Hub Complete
Nature Restoration
Protection and restoration of biodiversity focusing on over-
exploitation of the natural environment and addressing its
consequences; habitat loss and fragmentation; and invasive non-
native species - 22/23 completed - 23/24 started
Perth Museum
Refurbishment of Perth City Hall to create new museum spaces
and cafe. Main construction phase complete and install/fit out on
schedule for planned opening spring 2024
Perth Art Gallery Refurbishment of temporary galleries - scheduled for completion
November 2023
Collections Centre Project removed from programme
PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink. On hold
pending outcome of Leisure and Culture Assets Review
Letham Community Wellbeing Hub
Refurbishment of Letham Wellbeing Hub to offer a range of
services to the local community managed by Letham4All -
scheduled for completion end 2023
City Centre Developments - Cultural Attractions
Community Planning
Other Planning Projects
Perth & Kinross Place-making
Page 126 of 146

Page 127

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment 30-Nov-23
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House New Build Programme
Glebe, Scone - 65 Units 17 17 17 0 0 0 0 17   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
17 0 17 0 17 0 0 0 0 17
Huntingtower, Perth - 70 Units 1 1 1 0 0 0 0 1   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
1 0 1 0 1 0 0 0 0 1
Fairfield, Perth 251 251 195 251 0 0 0 0 251   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
251 0 251 195 251 0 0 0 0 251
Lynedoch Road, Methven 698 37 735 670 735 0 0 0 0 735   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
698 37 735 670 735 0 0 0 0 735
Future Developments 0 0 0 5,091 6,014 6,014 12,552 29,671   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
0 0 0 0 0 5,091 6,014 6,014 12,552 29,671
Total Council House New Build 967 37 1,004 865 1,004 5,091 6,014 6,014 12,552 30,675
Increase in Council House Stock
Council House Buy-Backs 4,605 462 5,067 5,067 5,067 3,000 3,000 3,000 3,000 17,067
Scottish Government Subsidy (1,050) (1,050) (1,050) 0 0 0 0 (1,050)
3,555 462 4,017 5,067 4,017 3,000 3,000 3,000 3,000 16,017
Lock-ups and Garage Sites 0 0 0 50 0 0 0 50
Standard Delivery Plan
Heating Upgrade Contract Works 747 71 818 176 818 1,320 1,320 811 0 4,269
Rewiring, Infrastructure & Property Refurbishment 1,515 1,515 368 1,515 1,686 0 0 0 3,201
Triple Glazing 3,866 3,866 2,927 3,866 0 0 0 0 3,866
Controlled Door Entry 0 0 0 28 0 0 0 28
Kitchen Modernisation Programme 374 374 176 374 1,504 2,025 0 0 3,903
Bathroom Modernisation Programme 1,436 1,436 731 1,436 0 0 0 0 1,436
External Fabric 958 958 695 958 0 259 0 0 1,217
Energy Efficiency 270 670 940 503 940 388 0 0 0 1,328
Multi Storey Flats 2,243 (1,815) 428 50 428 1,815 0 0 0 2,243
Environmental Improvements 899 899 524 899 0 0 0 0 899
Fire Precaution Measures 399 399 115 399 0 0 0 0 399
Sound Insulation 289 289 289 100 42 0 0 431
Structural 478 478 478 250 522 0 0 1,250
SHQS Future Developments 0 0 0 0 4,066 6,458 5,553 16,077
Total Standard Delivery Plan 13,474 (1,074) 12,400 6,265 12,400 7,091 8,234 7,269 5,553 40,547
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 82 82 26 82 22 0 0 0 104
Anchor House, Rannoch Road, Perth - Conversion (5 Units 87 87 13 87 0 0 0 0 87
149-151 Dunkeld Road, Perth 277 277 105 277 0 0 0 0 277
111 Rannoch Road, Perth (Former Driving Test Centre) 8 8 8 0 0 0 0 8
St.Catherine's Square Redevelopment 2,991 (2,975) 16 16 3,377 0 0 0 3,393
Shops & Offices 239 239 239 50 0 0 0 289
Greyfriars and Satellite Sites 34 34 2 34 50 0 0 0 84
Sheltered Housing 11 11 2 11 0 0 0 0 11
Double Dykes Chalet Replacement 0 0 15 0 0 0 0 0 0
General Capital Works 70 50 120 94 120 0 0 0 0 120
Upgrade and Replacements to Lifts Programme 137 137 137 0 0 0 0 137
ICT Expenditure 131 131 131 50 0 0 0 181
Mortgage to Rent 175 175 175 50 0 0 0 225
Total Other Investment in Council House Stock 4,242 (2,925) 1,317 257 1,317 3,599 0 0 0 4,916
Total Net Expenditure 22,238 (3,500) 18,738 12,454 18,738 18,831 17,248 16,283 21,105 92,205
Income
CAPITAL RECEIPTS 0 (8) (8) (8) (8) 0 0 0 0 (8)
CFCR (2,055) (2,055) (2,055) (1,918) (2,248) (2,520) (2,752) (11,493)
TOTAL BORROWING REQUIREMENT 20,183 (3,508) 16,675 12,446 16,675 16,913 15,000 13,763 18,353 80,704
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2026/27
PERTH AND KINROSS COUNCIL
7
Page 127 of 146

Page 128

Page 128 of 146

Page 129

SIGNIFICANT CAPITAL PROJECTS
PROGRESS UPDATE
APPENDIX IV
Project Title Total Gross
Budget
(£'000)
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On Site Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement
36,000 0 36,000 36,000 Phase 1 completion
date December 2024,
phase 2 Easter 2025.
Yes Yes On track No Works are progressing well on-site.
New Primary School at
Bertha Park Site
24,000 0 24,000 24,000 Summer 2028 No No Rephased pending
review
Yes. Rephasing of the project to take account of the
projections for the number of catchment pupils.
Riverside Primary New
School
19,899 0 19,899 19,899 June 2023 Yes Yes Complete Yes. Complete
Perth High School - New
School Investment
80,200 0 80,200 80,200 Summer 2026 - school
building curently
scheduled to open
summer 2025
Yes Yes On track No Works are progressing on-site.
Harris
Academy/Invergowrie
Extension
5,200 0 5,200 5,200 Late 2023 Yes Yes On track No Main extension complete, reconfiguration works still to
be undertaken.
Cross Tay Link Road
(CTLR)
150,500 40,000 110,500 110,500 Spring 2025 Yes Yes On programme No Works progressing well and remain on target for
completion in Spring 2025. on programme. Bridge deck
works due to commence and preparation works
underway for this.  One this is underway a detailed
analysis of contingency and compensation events will be
undertaken. 
Comrie Flood Protection
Scheme
28,435 0 28,435 28,435 Spring 2025 No No Advance works
complete; Main works
at tender assessment.
Yes Main works tender received in June 2023 but cost higher
than anticipated; tender assessment is currently on-
going (including independent tender estimate, tender
clarifications, tender negotiations and value
engineering). This work has also been delayed by recent
flood events. The next steps will include liaising with the
Scottish Government to seek an increase in capital grant
(equal to 80% of the project cost at tender stage) and
the Council's capital plan (for the remaining 20%). This
has delayed the commencement of the main
construction works; once started the works will have a
duration of 18 months.
Perth Eco Innovation Park* 32,817 11,275 21,542 21,542
Not currently
programmed No No
Preliminary design
works completed Yes
Following the application for Levelling Up Fund Grant
funding of £10m being unsuccessful, the Council
approved a net increased of £10m on 1 March 2023
however the balance of £20m remains unfunded and
therefore the project cannot progress.  Private sector
contributions will be required  in years beyond the
current programme to 2027/28 linked to house
completions along with receipts from employment land
plot sales.
Perth Museum 27,232 10,300 16,932 16,932 Spring 2024 Yes Yes On track No
Construction phase complete and building handover to
CPK completed 8 August. Exhibition fit out underway.
Additional support for cafe fit-out & set up costs
requested from cultural reserves, of up to £230,000
PH2O 90,000 0 90,000 90,000
Not currently
programmed No No
Outline Business Case
reported to Council  23
February 2023, and
project on hold
pending review. Yes
Council approved to put the project on hold due to
affordability and pending the outcome of a wider review
in to leisure and cultural assets and how best to target
the required investment in arts and leisure for the benefit
of the wider community.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 5-year programme.
7
Page 129 of 146

Page 130

Page 130 of 146

Page 131

PERTH AND KINROSS COUNCIL 
Finance and Resources Committee 
31 January 2024 
FLEXIBLE WORKING FRAMEWORK 
Report by Corporate HR Manager
(Report No. 24/42) 
1. PURPOSE 
1.1 The Council’s employment policies support the effective delivery of services
and Corporate Plan Priorities.  They also reflect the Council’s commitment to
being a fair and inclusive employer. The current flexible working policies and
provisions are being updated to ensure they take account of the Council’s
operating environment, upcoming legislative changes and support the
development of our culture and ensure our employment package is
competitive. The core Flexible Working Framework (the Framework) is
detailed in Appendix 1 and incorporates the main flexible working provisions
which will be supported by operational guidance. 
1.2 This report therefore seeks approval of the Framework which will formalise
hybrid working as a workstyle and ensure a fair and consistent approach that
is focussed on operational and customer need. 
1.3 This report also asks Committee to note that the Framework, and the
associated operational guidance, will continue to be updated to reflect new
employee rights which are at different stages of the UK parliamentary
approval process.   
2. RECOMMENDATIONS 
2.1 It is recommended that Committee approves the core Flexible Working
Framework as set out in Appendix 1, which will be supported by operational
guidance. 
2.2 Committee are asked to note that with effect from 1 April 2024 a revised
Hybrid working approach will establish the requirement for a minimum level of
attendance in a workplace of normally 2 days per week. This closely aligns
with the effective date for some of the legislative changes relevant to the
content of the Framework. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections:
Section 4: Background/Main Issues 
Section 5: Proposals 
Section 6: Conclusion 
Appendix 1: Draft Flexible Working Framework
Appendix 2: Forthcoming related legislation
8
Page 131 of 146

Page 132

4. BACKGROUND / MAIN ISSUES 
4.1 The environment in which the Council operates has changed during and since
the Covid-19 Pandemic impacting on the way that services are delivered.
Hybrid working arrangements developed at pace from the outset of the
pandemic and were reviewed regularly as restrictions eased, new ways of
working were embraced and have continued to adapt to organisational
requirements. The development of the Framework brings together the
different provisions which support increased levels of flexibility, formalises
hybrid working as a workstyle and sets out key principles which help maintain
a focus on operational and customer need. 
4.2 The flexibility and responsiveness provided by the Framework will particularly
support the following principles within the Corporate Plan: 
a) Working with our communities and partners and putting people first.
b) Being a visible and valued part of our communities, engaging with and
being accessible and responsive to our residents.
c) Making best use of available assets …..(to) best serve the community. 
4.3 Within the employment market, employees’ expectations of the flexibility and
support offered by an employer have also changed, with arrangements such
as hybrid working being sought by many applicants. To ensure that we are
viewed as an employer of choice in an increasingly competitive labour market,
we need to ensure that our employment offer is attractive to potentially new
and existing employees.  The availability of flexible working opportunities also
helps the Council as an employer to attract and retain a diverse and inclusive
workforce. 
4.4 Recent changes to employment legislation have increased employees’ rights
across the UK, with further changes scheduled over the next year.  An
overview of the pending and draft legislation is provided in Appendix 2.  Once
approved, these legislative changes will impact on the provisions the Council
will be required to offer employees in respect of how we work, with resulting
updates to our general terms and conditions of employment.  The approach
taken to the new Framework is intended to future proof these provisions
based on what we know at this time.  Consultation will continue to take place
with our recognised trade unions, relevant stakeholder groups, such as the
disABILITY Staff Network, and updates will be provided at meetings of the
Employees Joint Consultative Committee and Joint Negotiating Committee for
Teachers. 
4.5 The Council also has obligations as a Fair Work First Employer and through
our Equality commitments as set out in our Equality and Outcomes
Mainstreaming Report. These are essential considerations in the development
of our culture and are reflected in our Values. The Framework and associated
guidance will reflect these commitments where they relate to flexibility in how,
where and when employees work. 
4.6 The Policy and Governance Group and Executive Leadership Team have
been consulted in the development of the Framework which sets out the
Council’s policy commitments on flexible working. There has also been
Page 132 of 146

Page 133

consultation with the Extended Leadership Team, the Working Smarter
Project Group (specifically regarding hybrid working and the impact on
workspace utilisation and planning). Our recognised trade unions have been
consulted on the development and review of hybrid working arrangements
and will continue to be key stakeholders in the Framework and associated
guidance. 
5. PROPOSALS 
5.1 The proposed core Flexible Working Framework, as set out in Appendix 1,
incorporates a policy statement on the Council’s commitments to flexible
working. It includes the new provisions relating to hybrid working which will be
effective from 1 April 2024. 
5.2 The Framework will be supplemented by operational guidance for managers
and employees.  This guidance and related processes will be developed in
consultation with our recognised trade unions and updates provided to future
meetings of the Employees Joint Consultative Committee and Joint
Negotiating Committee for Teachers, as appropriate. 
5.3 The core elements of the Framework cover: 
How we work 
The Framework identifies 6 key themes and the principles associated with each,
which are essential in all forms of flexible working:- 
• Effective use of Technology and Resources; 
• Developing our Culture to reflect changing service demands; 
• Health, Safety and Wellbeing; 
• Communication; 
• Fairness and Inclusion;
• Focus on Results. 
Guidance is also provided to ensure flexible working arrangements meet operational
and customer requirements whilst balancing employee’s needs, as far as reasonably
practical. 
When we work 
The Framework confirms the different forms of working patterns currently in place
across the Council and how these can be best used to support effective service
delivery. These include:- 
• Term Time Working, 
• Annualised Hours, 
• Part-Time working, 
• Job Share arrangements, 
• Compressed Hours, 
• Rota/Shift design, and
• Temporary adjustments. 
Page 133 of 146

Page 134

Guidance is also provided on the related processes which ensure the Council as an
employer fulfils its legal obligations. 
Where we work 
A number of formal work styles are in place across the Council: 
• Hybrid, 
• Home based, 
• Fixed Office based, 
• Digital Mobile Working, 
• Non-Digital Mobile Working. 
Guidance is available on their use and how the principles relating to how we work
should be applied and/or adapted to each. 
5.4 One aspect of flexible working that has continued to develop is the use of
hybrid working. The approach taken and the related guidance has been
regularly updated to reflect changing circumstances over the past three years
in order to support those working remotely and those managing remote
teams.  The Hybrid work style allows a pattern of attendance (fixed or flexible)
combining working from home and from workplaces which may be the
contracted place of work, other Council premises or that of a customer,
partner, stakeholder, or community setting. 
5.5 The most recent review of the Hybrid work style arrangements was
specifically focused on service delivery and customer requirements, as well as
internal connectivity and collaboration. As a result of this review, with effect
from April 2024: 
a) The Hybrid work style will be mainstreamed within the Flexible Working
Framework; and
b) Hybrid working arrangements will be based on a consistent approach
across the organisation of normal workplace attendance of at least 2
days per week. Within this requirement, managers will have flexibility to
design the pattern of attendance to best support service delivery.  This
guidance on hybrid working will be kept under review to ensure it
meets operational requirements and reflects any decisions of Council
in respect of its property estate. 
6. CONCLUSION 
6.1 The proposed Flexible Working Framework sets out the policy commitments
and refers to operational guidance for managers and employees on all
aspects of our flexible working offer including Hybrid Working, to ensure a fair
and consistent approach with maximum benefit to all stakeholders. 
Author(s)
Name  Designation Contact Details
Sandra Lawson Senior HR Officer HR@pkc.gov.uk 
Page 134 of 146

Page 135

Fiona Thomson HR Manager 
Approved 
Name Designation Date
Pauline Johnstone  Corporate HR Manager  January 2024 
APPENDICES 
• Appendix 1 – Draft Flexible Working Framework
• Appendix 2 – Forthcoming Related Legislation 
Page 135 of 146

Page 136

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  n/a
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment n/a
Sustainability (community, economic, environmental) n/a
Legal and Governance  n/a
Risk n/a
Consultation 
Internal  Yes
External  n/a
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(i) Reducing Poverty (including child poverty, fuel poverty and food poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the new Corporate Plan:-  
(i) Children and young people grow up safe, respected, well-educated,
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities
for all; 
(iii) People can achieve their best physical and mental health and have
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations.
Page 136 of 146

Page 137

2. Resource Implications 
Financial 
2.1 There are no direct financial implications.  
Workforce 
2.2 There are no direct workforce number implications as a result of the
development of the Flexible Working Framework 
The Framework will be supported by clear guidance regarding flexibility
options available to managers and employees which will support an
employment experience which is designed to be more attractive to potential
employees and tailored to those already in employment. This will improve the
recruitment and retention of our workforce. 
This proposal is put forward by the Corporate Human Resources Manager. 
Asset Management (land, property, IT) 
2.3 There are potential implications for the property portfolio which will be
considered during the development of guidance. The Strategic Lead, Property
has been consulted on the proposals, particularly with regard to hybrid
working. 
3. Assessments 
Equality Impact Assessment 
This proposal has been assessed as relevant and the following positive
outcomes are expected following implementation: 
• Improved opportunity to support employees with additional personal
needs that can be addressed through the use of a flexible approach to
working.
• Improved awareness of managers and employees of the options
available to support a flexible approach to working (how, where, when).
• Opportunity for employees to be proactive in their balance of working
and personal life as a result of increased awareness/improved
accessibility to related guidance and procedures. 
Strategic Environmental Assessment 
The proposals have been considered under the Act however, no action is
required as the Act does not apply to the matters presented in this report.   
Sustainability 
There is the potential for elements of the Flexible Working Framework to
impact on our Climate Change efforts, namely hybrid working and it’s impact
Page 137 of 146

Page 138

on commuter traffic. As we develop each element this impact will be
considered. 
Legal and Governance 
3.4 There are no legal implications. 
Risk 
3.6 The proposal will not negatively impact existing risks or generate new risks. 
4. Consultation 
Internal 
4.1 Internal consultation activity has been detailed in the report – ELT, Policy and
Governance, Smarter Working Project Group. 
External 
4.2 External consultation has focused on our recognised trade unions and details
of this are included in the report. 
5. Communication 
5.1 Work will be undertaken with the Communications Team to ensure that: 
Managers are provided with guidance on the Framework, hybrid working and
other elements and the necessary actions required of them as a result. 
Employees will be provided with initial information regarding future plans
regarding flexible working, changes in the legislative landscape and our
internal provision and options available to them. 
Trade Unions will be given the opportunity to co-create guidance and other
documents which will form the content of the Framework. 
Communication channels used will be:
The intranet (Eric)
Cascade via managers
Our recruitment information on www.pkc.gov.uk and MyJobScotland 
2. BACKGROUND PAPERS 
n/a 
Page 138 of 146

Page 139

Draft Flexible Working Framework 
1. Introduction 
The purpose of the Flexible Working Framework (the Framework) is to ensure
working arrangements support and enable service delivery and meet the Council’s
Corporate Plan priorities for the people of Perth and Kinross.  It will also enable
colleagues to have a balance to their working lives and offer an attractive
employment package to potential employees. 
The Framework will be supported by guidance and support for managers to allow
them to develop appropriate approaches to employees’ working time, place and
practice, and to advise employees of the options available to them. 
We know that our colleagues thrive personally and professionally when working
together with purpose. Collaboration and connection are fundamental to our success
in meeting the needs of the people of Perth and Kinross. The importance of that
connection and sense of belonging will be supported through the Framework. 
Policy Statement
The Council recognises that there are all-round benefits from offering additional
flexibility to employees in the hours they work, the times that their working week is
organised and where they conduct their work. 
It is appreciated that particular flexible working provisions will not work for or be
available to everyone. It will depend on the type of role carried out, the demands of
the role, the team worked in, levels of cover required and the requirement to deliver
the best possible service to our customers. Agreed working arrangements must
ensure a high level of service delivery to customers (internal and external). 
2. Flexible Working 
A What do we mean by Flexible Working? 
Flexible Working arrangements allow employees, through agreement with their
manager, to vary the amount, timing or location of their work, to the benefit of both
the individual and the organisation. In other words, creating flexibility in how, when
and where an employee works in order to fulfil their role.   
B  Why does Flexibility Matter? 
Having flexibility in our working arrangements: 
• Supports the achievement of corporate priorities
• Ensures employees have the opportunity to engage with colleagues and
customers in the most effective manner
• Supports our employees to achieve a balance in their working and personal
lives
APPENDIX 1
8
Page 139 of 146

Page 140

• Enhances our terms and conditions and our reputation as an employer
thereby supporting our recruitment activity
• Supports our equality and inclusion agenda 
This Flexible Working Framework brings together the different provisions which
support increased levels of flexibility and develops these to address future
requirements. It will particularly support the following principles within the Corporate
Plan: 
a. Working with our communities and partners and putting people first.
b. Being a visible and valued part of our communities, engaging with and being
accessible and responsive to our residents.
c. Making best use of available assets ….(to) best serve the community. 
To be a high performing organisation, the Council must harness the benefits of
flexibility, whilst ensuring our employees connect and work together in the most
effective way in order to meet the needs of our customers and community. 
Successful teams need face to face contact, interaction for inspiration and to learn
from and support each other. 
The Framework clarifies our flexible working offer and provides clear guidance for
current and potential employees. This supports the recruitment, induction and
development of our workforce, and reflects our organisational culture.   
➢ Benefits for our customers and community
• Improved local access to services
• Increased times of access to Council representatives 
➢ Benefits to the organisation
• Potential to attract and retain a wider range of talent
• Becoming a more inclusive and diverse employer
• Productivity/Output improved
• Reduced carbon footprint 
➢ Benefits to the employee
• Improved Work Life Balance
• Benefits to Wellbeing 
• Reduction in Commuting
• Wider range of opportunities accessible 
C How Will We Measure Effectiveness? 
Our organisation has clear priorities and we measure our effectiveness against the
achievement of our organisation objectives and delivery of these priorities.
Therefore, we also have to be output focused at all levels of the organisation; to
ensure that our employees are supported to deliver the best service it must be clear
how organisation objectives translate to an individual level. 
Direction is provided through the Corporate Plan and relevant strategies – all of
which are underpinned by our Values (Ambition, Compassion, Integrity) and related
behaviours and competencies. These building blocks support the development of
clear, manageable and measurable objectives at Service, team and individual levels. 
Page 140 of 146

Page 141

Guidance is provided on how flexible working should be considered when developing
objectives and how it can be used to support their delivery. 
Objectives are regularly reviewed and revised to reflect changing priorities. This
gives the opportunity for managers to discuss flexible working arrangements to
ensure they continue to support effective performance and to make necessary
changes to reflect changes in the needs of the organisation or employees. 
3. Supporting Flexible Working 
The Principles: 
Based around 6 key themes - Health, Safety & Wellbeing; Communication;
Culture; Fairness & Inclusion; Technology & Resources; and Focus on Results
- the principles provide a framework to support the success of all forms of Flexible
Working and ensure they meet employees and organisational needs. 
HOW WE WORK 
Further guidance on the principles associated with each theme is available to allow
local application of appropriate working arrangements. 
WHEN WE WORK 
For most employees there will be times when we are required to be available to our
customers, both external and internal, or core hours when levels of activity require
our attendance at work. 
Page 141 of 146

Page 142

However, some degree of flexibility in when we work, will be an option for many, if
we stick to the principles underpinning "How" we work. Existing options are
summarised in the guidance and include: 
a. Compressed Hours
b. Annualised Hours
c. Part Time Working
d. Job Share Arrangements
e. Term Time Working
f. Rota/Shift Design
g. Temporary amendments 
In the Council, many people already have an agreed flexible working arrangement in
place with regard to when they work, utilising one of the existing flexible working
policies. 
WHERE WE WORK 
Where we work will depend on the type of work we are doing, the demands of the
role, where we will be most productive and where space is available. 
Not all roles are suitable for home/ remote working, for example, roles involving face
to face contact with customers, front line roles or some training/supervisory roles. 
For many, Hybrid Working - a combination of working at home and in a Council or
non-Council (e.g. partner or stakeholder) workplace, or community setting will be
optimal and reflects existing working practice. 
The most common examples of where we work are described in the Council’s Work
Styles:
a. Hybrid, 
b. Home based, 
c. Fixed Office based, 
d. Digital Mobile Working, 
e. Non-Digital Mobile Working. 
4. Types of Flexible Working – Guidance is available on :- 
A Where 
• Hybrid Working
• Hybrid working principles
• Hybrid working FAQ
• Home working 
• Fixed base 
• Mobile working 
• Smarter working styles 
• Smarter working styles and ICT standards of provision
• Working from a distant/non-UK base (available from HR)
Page 142 of 146

Page 143

B When 
• Hours of work 
• Types of working arrangement
• Existing Special Leave support provision e.g. Carer Leave, Compassionate
Leave, Parental Leave
• Forthcoming Special Leave provision led by pending employment legislation
and will be incorporated into the Framework following consultation with our
recognised trade unions. In 2024 this includes Neonatal Leave and
Miscarriage Leave. 
C How 
• Job sharing arrangements
• Secondment opportunities
• Job family moves 
5. Flexible Working Requests 
A.  Flexibility in new roles/vacancies 
Where a role has been identified as suitable for flexible working, this should be noted
in the vacancy advert as appropriate. 
Consideration should be given to the skills and attributes looked for in a candidate
where the role may involve a particular type of flexible working e.g. digital,
organisational skills, able to work on own initiative/independently. 
B.  Flexible Working – Organisation Required 
Instances may arise, as part of business improvement/transformation, that result in
employees being required to amend their pattern of attendance on a either a
temporary or long-term basis. 
Temporary changes could be needed for operational reasons to support colleagues
or delivery requirements e.g. managers can adjust working arrangements to support
the induction and training of new employees, to respond to emergency or unplanned
situations or to meet pressing delivery deadlines. 
Longer term/permanent change may come about due to restructure or service
design changes. 
We recognise that these changes may not be easy for some depending on their
particular role and personal circumstances. 
Part of ensuring inclusion and equality in the way we work is taking into account
individual working preferences and personal circumstances; individual discussion is
therefore important to ensure that all options are considered, particularly where there
Page 143 of 146

Page 144

is a requirement to address reasonable adjustments.  Any changes to the way we
work which involve a contractual change will be implemented following appropriate
consultation with relevant parties. 
C.  Flexible Working – Employee Requests 
(w.e.f. 6 April 2024)
All employees have the right to 
- make a formal request for flexible working from day one of employment 
- make up to two requests in any 12 month period. 
Examples of requests that could be made are: 
• reducing the number of hours worked
• opting into a hybrid working pattern
• compressing working hours into fewer days 
Employees wishing to request any form of flexible working, should discuss this with
their line manager in the first instance to ensure all suitable options are considered. 
A formal request can then be made and considered via the process outlined in the
Flexible Working Guidance. 
6. Related Policies/Guidance supporting flexibility across the
organisation (Links will be included) 
Health, Safety and Wellbeing
• Health & Safety Guidance for Employees working at home
• Health and Wellbeing Framework
• Hybrid Working Safely
• Equally Safe at Work
• Lone Working Arrangements
• Toolkit for Working Smarter 
Communications
• Virtual Meetings – advice
• Effective Virtual Teams (CIPD) 
IT
• Working from Home Like a Pro
• Severe Weather Arrangements 
Miscellaneous
• Recruitment Guidance
• Induction Process
• Scottish Government Guidance – Flexible Working
• Draft Workspaces FAQ
Page 144 of 146

Page 145

APPENDIX 2 
Forthcoming Legislative Changes – Confirmed and Potential 
Legislation Key Provision Status
Employee Relations
(Flexible Working)
Act 2023
Provides employees with the
right to request flexible working
from the first day of
employment with 2 requests
per 12 month period 
Effective 6 April 2024
Carers Leave Act
2023
Introduces a minimum unpaid
leave entitlement for carers 
Effective 6 April 2024
Workers
(Predictable Terms
and Conditions) Act
2023
Provides the right for
employees to request a
predictable working pattern 
Received Royal Assent
September 2023.
Expected implementation
around September 2024
Neonatal Care
(Leave and Pay)
Act 2023
Provides the right to 12 weeks’
leave and pay when neonatal
care is required 
Passed May 2023.
Will be implemented April
2025
Paternity (Leave
and Pay) Bill
Proposes further flexibility in
the timing and design of
paternity leave use 
At second reading in
Parliament
Miscarriage Leave
Bill
Proposes three days’ paid
leave for employees where
they experience miscarriage,
ectopic pregnancy or molar
pregnancy before 24 weeks 
At second reading in
Parliament 
8
Page 145 of 146

Page 146

Page 146 of 146