Agenda Document Pack - Finance and Resources Committee - 13/09/2023

Perth and Kinross Council · 13 September 2023
Back to Finance and Resources Committee — 13 September 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
06/09/2023 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 13 September 2023 at 14:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Stewart Donaldson  (Convener)
Councillor Grant Laing  (Vice-Convener)
Bailie Chris Ahern
Bailie Alasdair Bailey
Councillor Peter Barrett
Councillor Andy Chan
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor John Duff
Councillor Angus Forbes
Provost Xander McDade
Councillor Tom McEwan
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Page 1 of 136

Page 2

Page 2 of 136

Page 3

Finance and Resources Committee 
Wednesday, 13 September 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTES   
3(i)  MINUTE OF MEETING OF FINANCE AND RESOURCES
COMMITTEE OF  7 JUNE  2023 FOR APPROVAL
(copy herewith) 
5 - 6 
3(ii)  MINUTE OF SPECIAL MEETING OF FINANCE AND
RESOURCES COMMITTEE OF 20 JUNE 2023 FOR APPROVAL
(copy herewith) 
7 - 8 
3(iii)  MINUTE OF MEETING OF THE EXECUTIVE SUB-COMMITTEE
OF FINANCE AND RESOURCES COMMITTEE OF 24 JULY 2023
FOR APPROVAL
(copy herewith) 
9 - 10 
3(iv)  MINUTE OF MEETING OF EXECUTIVE SUB-COMMITTEE OF
FINANCE AND RESOURCES COMMITTEE OF 30 AUGUST 2023
FOR APPROVAL
(copy herewith) 
11 - 12 
4 REVENUE BUDGET 2023/24 - UPDATE NO 1
Report by Head of Finance (copy herewith 23/242) 
13 - 48 
5 COMPOSITE CAPITAL BUDGET 2023/28 & HOUSING
INVESTMENT PROGRAMME 2023/28 - MONITORING REPORT
NO. 1
Report by Head of Finance (copy herewith 23/243) 
49 - 86 
6 TREASURY ACTIVITY AND COMPLIANCE REPORT 2023/24
QUARTER 1 
87 - 106
Page 3 of 136

Page 4

Report by Head of Finance (copy herewith 23/244) 
7 TRANSFORMATION AND CHANGE STRATEGY 2023/24 -
2027/28 - UPDATE REPORT
Report by Chief Executive (copy herewith 23/245) 
107 - 136 
Page 4 of 136

Page 5

FINANCE AND RESOURCES COMMITTEE 
Minute of hybrid meeting of the Finance and Resources Committee held in the
Council Chamber, 2 Hight Street, Perth on Wednesday 7 June 2023 at 2.00pm. 
Present: Councillors S Donaldson and G Laing, Bailies C Ahern and A Bailey, and
Councillors P Barrett, A Chan, D Cuthbert, E Drysdale, J Duff, D Illingworth
(substituting for Councillor A Forbes) S McCole (substituting for Depute Provost
A Parrott), Provost X McDade, T McEwen and J Rebbeck 
In Attendance: T Glen, Chief Executive; L Simpson, Head of Legal and Governance
Services; B Renton, Executive Director (Communities); S Devlin, Executive Director
(Education and Children’s Services); C Mailer (Chief Executive’s Service);
K Donaldson, Chief Operating Officer; S MacKenzie, Head of Finance, E Ritchie
(Communities), S Walker, L Brady, K Fraser, P Johnstone, S Crawford, A Taylor,
N Sutherland, K Molley, R Ramsay and M Pasternak (all Corporate and Democratic
Services). 
Apology: Depute Provost Parrott, Councillors A Forbes, and C Stewart. 
Councillor S Donaldson, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting and apologies were
noted above. 
2. DECLARATIONS OF INTEREST 
There were no declarations made in terms of the Councillors’ Code of
Conduct. 
3. MINUTE OF PREVIOUS MEETINGS 
The minute of meeting of the Finance and Resources Committee of 26 April
2023 was submitted and approved as a correct record. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
(i) The contents of the Outstanding Business Statement, be noted.
(ii) The removal of all completed actions from the Outstanding Business
Statement, be agreed. 
5. AUTHORITY TO WRITE OFF DEBTS AND OBSOLETE STOCK 
There was submitted a report by Head of Finance (23/174) (1) seeking
approval to write off identified debts in respect of Sales Ledger; Council Tax
(including Water & Wastewater charges); Non-Domestic Rates; Irrecoverable Rents;
Housing Benefit Overpayments and Car Park Trading Account Income; (2) seeking
approval to write off obsolete stock and write off other miscellaneous balances.
3(i)
Page 5 of 136

Page 6

Amendment (Councillors J Rebbeck and P Barrett) 
On a one off / non-recurring basis and specifically in relation to school meal /
breakfast club debt, this Amendment proposes to write off the balance at 31 March
2023 of £12,871.   
Councillors S Donaldson and G Laing agreed to incorporate Councillors
J Rebbeck and P Barrett’s amendment into their motion. 
Resolved:
(i) All amounts detailed in section 4 and the attached appendices to this report
are written off for accounting purposes, be approved.
(ii) It be noted, that whilst these amounts are written off, the files are not closed,
and every effort will be made to collect outstanding debt where recovery is
cost effective.
(iii) The removal of charges for services for people seeking asylum for a further
year – see section 5, be approved.
(iv) It be approved, that on a one off / non-recurring basis in relation to school
meal / breakfast club debt, to write off the balance at 31 March 2023 of
£12,871. 
6. SERVICE ANNUAL PERFORMANCE REPORT 2022/23 CORPORATE &
DEMOCRATIC SERVICES 
There was submitted a report by Chief Operating Officer (23/175) (1)
presenting the Service Annual Performance Report 2022/23 for Corporate and
Democratic Services (CDS); and (2) detailing progress over the last year against
improvement actions contained within the 2022/23 Service Business Management
Improvement Plan. 
Resolved:
The Corporate and Democratic Services’ Annual Performance Report
2022/23 (23/175), be approved.
Page 6 of 136

Page 7

FINANCE AND RESOURCES COMMITTEE 
Minute of Special hybrid meeting of the Finance and Resources Committee held in
the Council Chamber, 2 Hight Street, Perth on Tuesday 20 June 2023 at 2.00pm. 
Present: Councillors S Donaldson and G Laing, Depute Provost A Parrott, Bailies
C Ahern and A Bailey, and Councillors P Barrett, D Cuthbert, E Drysdale, A Forbes,
D Illingworth (substituting for Councillor A Chan), I James (substituting for Councillor
J Duff), I Massie (substituting for Councillor J Rebbeck), S McCole (substituting for
Provost X McDade), T McEwen and C Stewart. 
In Attendance: T Glen, Chief Executive; L Simpson, Head of Legal and Governance
Services; S Walker, P Johnstone, K Molley, M Pasternak, and R Ramsay (all
Corporate and Democratic Services). 
Apologies: Provost X McDade, Councillors A Chan, J Duff and J Rebbeck. 
Councillor S Donaldson, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting and apologies were
noted above. 
2. DECLARATIONS OF INTEREST 
There were no declarations made in terms of the Councillors’ Code of
Conduct. 
THE VICE-CONVENER LED DISCUSSION ON THE FOLLOWING ITEM. 
3. PERTH AND KINROSS COUNCIL LEADERSHIP REVIEW – NEW
EXECUTIVE AND STRATEGIC LEADERSHIP STRUCTURE 
There was submitted a report by Chief Executive (23/195) providing an
update on the Council’s Leadership Review transformation workstream which is a
key element of the wider Transformation and Change Strategy 2022/23 to 2027/28. 
Resolved:
(i) The contents of Report 23/195, be noted.
(ii) The implementation of the new executive and strategic leadership structure as  
set out by the Chief Executive; the associated processes for the filling of
posts; and consideration of any voluntary severance or voluntary redundancy
applications, as appropriate, be approved.
(iii) The convening of an Executive Sub-Committee of the Finance and Resources
Committee on 24 July 2023 to consider applications for voluntary severance,
redundancy and any other potential costs associated with the changes, as
appropriate, recommended by the Chief Executive to assist in enabling the
implementation of the new strategic leadership structure, be agreed.
(iv) The establishment of an Appointment Sub-Committee for the recruitment of
Director level posts within the new strategic leadership structure, be agreed.
3(ii)
Page 7 of 136

Page 8

(v) It be noted that updates on this, and further phases of the Leadership Review,
would be reported to future Finance and Resources Committees, in line with
agreed reporting arrangements and would be supplemented through Elected
Member briefing notes and member briefing sessions. 
Page 8 of 136

Page 9

EXCUTIVE SUB-COMMITTEE OF FINANCE AND
RESOURCES COMMITTEE 
Minute of hybrid meeting of the Executive Sub-Committee of the Finance and
Resources Committee held in the Council Chamber, 2 Hight Street, Perth on
Monday 24 July 2024 at 1.00pm. 
Present: Councillors S Donaldson, G Laing, P Barrett, D Cuthbert, E Drysdale,
J Duff, and C Shiers. 
In Attendance: T Glen, Chief Executive; L Simpson, S Walker, P Johnstone, and
K Molley (all Corporate and Democratic Services). 
Councillor S Donaldson, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting. 
2. DECLARATIONS OF INTEREST 
There were no declarations made in terms of the Councillors’ Code of
Conduct. 
IT IS RECOMMENDED THAT THE PUBLIC AND PRESS SHOULD BE
EXCLUDED DURING CONSIDERATION OF THE FOLLOWING ITEM(S) IN
ORDER TO AVOID THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN
TERMS OF SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT
1973 
3. VOLUNTARY SEVERANCE AND EARLY RETIREMENT REQUESTS   
There was submitted a report by Chief Executive (23/210) seeking approval
for five requests for voluntary severance and early retirement.   
Resolved:
(i) The contents of Report 23/210, be noted.
(ii) The Chief Executive’s proposals to grant early retirement in the interests of
efficiency of the service for the chief officers named, be approved. 
(iii) The Chief Executive’s proposal to grant voluntary severance for the chief
officer named, be approved. 
(iv) It be noted that further updates on the Leadership Review be provided to the
Council’s Finance and Resources Committee, as agreed. 
3(iii)
Page 9 of 136

Page 10

Page 10 of 136

Page 11

EXCUTIVE SUB-COMMITTEE OF FINANCE AND
RESOURCES COMMITTEE 
Minute of hybrid meeting of the Executive Sub-Committee of the Finance and
Resources Committee held in MR410, 2 Hight Street, Perth on Wednesday 30
August 2023 at 2.45pm. 
Present: Councillors S Donaldson, G Laing, P Barrett, D Cuthbert, E Drysdale,
J Duff, and C Shiers. 
In Attendance: T Glen, Chief Executive; L Simpson, S Walker, P Johnstone, and
K Molley (all Corporate and Democratic Services). 
Councillor S Donaldson, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting. 
2. DECLARATIONS OF INTEREST 
There were no declarations made in terms of the Councillors’ Code of
Conduct. 
IT IS RECOMMENDED THAT THE PUBLIC AND PRESS SHOULD BE
EXCLUDED DURING CONSIDERATION OF THE FOLLOWING ITEM(S) IN
ORDER TO AVOID THE DISCLOSURE OF INFORMATION WHICH IS EXEMPT IN
TERMS OF SCHEDULE 7A TO THE LOCAL GOVERNMENT (SCOTLAND) ACT
1973 
3. VOLUNTARY SEVERANCE AND EARLY RETIREMENT REQUESTS   
There was submitted a report by Chief Executive (23/237) seeking approval of
a further request for voluntary severance and early retirement.   
Resolved:
(i) The contents of Report 23/237, be noted.
(ii) The Chief Executive’s proposals to grant early retirement in the interests of
efficiency of the service for the chief officer named in paragraph 5.1 of Report
23/237, be approved. 
3(iv)
Page 11 of 136

Page 12

Page 12 of 136

Page 13

Perth & Kinross Council 
Finance & Resources Committee 
13 September 2023 
REVENUE BUDGET 2023/24 – UPDATE NO. 1 
Contact Officer: Scott Walker, Chief Accountant
(Report No. 23/242) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2023/24 General Fund
Revenue Budget based upon the June 2023 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected over spend on the 2023/24 General Fund
Management Budget is £1.008 million (see Appendix 1). 
2. RECOMMENDATIONS 
2.1 The Committee is requested to: 
A. note the contents of the report, 
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2, 
C. note the projected outturn for Corporate Budgets set out in Section 6, 
D. note the funding update provided in Section 7, 
E. note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 3, 
F. approve the adjustments to the 2023/24 Management Revenue Budget
detailed in Sections 10,11 & 12 and Appendices 1, 2, 4, 5, and 6, 
G. note the financial risks set out in Section 13 and Appendix 7. 
3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 Issues Arising from Financial Year 2022/23
4
Page 13 of 136

Page 14

Section 10 2023/24 Additional Funding
Section 11 2023/24 Virements
Section 12 2023/24 Movements in Reserves
Section 13 Financial Risks
Section 14 Conclusions 
4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2023/24 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the June 2023 ledger, updated
for any subsequent known material movements. 
4.2 The budget total reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the 2023/24 Final Revenue Budget on 1
March 2023 (Report No. 23/72 refers).  In addition, adjustments approved by
the Finance & Resources Committee on 26 April 2023 (Report No. 23/120
refers) and Executive Sub-Committee of the Finance and Resources
Committee on 24 July 2023 (Report No. 23/219 refers) are reflected in
Appendix 1 (Column 2). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 The total net projected under spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £161,000 which represents
0.04% of total net Service expenditure. 
5.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below.   
5.3 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted inflation
levels.  This is already being seen in the cost of the materials required by
property and housing maintenance teams.  Going forward, this may continue
to have an impact on projected outturns and future years’ budgets. 
Education & Children’s Services 
5.5 The projected outturn for Education & Children’s Services excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
anticipated to be on target against budget.  The individual elements
contributing to this position is summarised in the following table and narrative.  
Page 14 of 136

Page 15

Function Projected Outturn Movement 
£’000 % £’000
Education Services Over spend 345 0.5 -
Children, Young People & Families Under spend (20) (0.1) -
Business & Resource Services Under spend (51) 0.7 -
Catering Services Under spend (274) (3.8) -
TOTAL  - - - 
5.6 Within non devolved Education Services there is a net projected over
spend of £345,000.  This is made up of the non-achievement of staff slippage
(£253,000), reduced income (£88,000) and loan charges (£36,000) partially
offset by savings on non-domestic rates (£32,000). 
5.7 In Services for Children, Young People & Families there is a net projected
under spend of £20,000.  Within this projection there is a net under spend on
support for young people and additional income partially offset by projected
over spends on legal & translation fees, and client travel partially. 
5.8 In Business & Resource Services there is a net under spend of £51,000
due to staff slippage partially offset by reduced school let income. 
5.9 In Catering Services there is a net projected under spend of £274,000 due to
updated meal projections. 
5.10 The Devolved School Management Scheme is currently projected to be on
target.  However, schools are experiencing challenges in delivering approved
staff slippage targets.  The budgets for the Devolved School Management
scheme are allocated by financial year (April – March), whereas expenditure
is incurred by academic year (August – June). 
5.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2024.  It is anticipated that the projected under
spend on teacher and support costs will be carried forward to 2024/25 to meet
commitments.  The budgets for the Pupil Equity Fund scheme are allocated
by financial year, whereas expenditure is incurred by academic year. 
Communities 
5.12 The projected outturn for Communities is currently anticipated to be £140,000
more than budget, which represents 0.2% of the Service Management
Budget.  The projected over spend is summarised in the following table and
narrative.  
Page 15 of 136

Page 16

Function Projected Outturn Movement 
£’000 % £’000
Environmental & Consumer Services Over spend 45 0.1 -
Planning & Development Over spend 30 0.5 -
Housing Over spend 40 0.5 -
Business & Resources Over spend 25 0.4 -
TOTAL Over Spend 140 0.2 
5.13 In Environmental & Consumer Services there is a projected net over spend
of £45,000.  The projected over spend is made up of additional costs relating
to hire costs (refuse collection vehicles), consultancy fees (operational assets)
and reduced income in corporate health & safety.  These are partially offset
by a net projected under spend on fleet management and additional income
from Bereavement Services. 
5.14 In Planning & Development there is a projected over spend of £30,000 in
relation to Perth Harbour.   
5.15 In Housing there is a projected over spend of £40,000 due to energy costs at
Greyfriars Hostel and void rent loss in relation to housing support properties. 
5.16 Within Business & Resources there is a projected over spend of £25,000
due to additional costs at Perth Bus Station.   
Corporate & Democratic Services 
5.17 The projected outturn for Corporate & Democratic Services is currently
anticipated to be £282,000 less that budget which represents 1% of the net
Service budget.  The main movements are summarised in the following table
and narrative. 
Function Projected Outturn Movement 
£’000 % £’000
Legal & Governance Services Under spend (156) (3.5) -
Finance Over spend 43 3.3 -
Human Resources Under spend (12) (2.6) -
IT & Revenues & Benefits Under spend (157) (1.6) -
TOTAL Under spend (282) 1.0 - 
5.18 In Legal & Governance, there is a projected under spend / additional income
of £156,000 which is primarily a result of additional staff slippage. 
5.19 Within Finance there is a projected over spend of £43,000 due to increased
external audit fees. 
5.20 In Human Resources there is a projected under spend of £12,000, due in the
main to staff slippage. 
Page 16 of 136

Page 17

5.21 In Information Technology and Revenues & Benefits there is a projected
under spend of £157,000, due primarily to the latest estimates on housing
benefit subsidy. 
5.22 Whilst the budget is on target across Property, there is a projected under
spend on energy and Pullar House which is contributing to additional
maintenance activity.   
Chief Executive Service
5.23 The projected outturn for the Chief Executive’s Service is currently anticipated
to be £19,000 less than budget due to staff slippage and additional income. 
6. REVENUE MONITORING – CORPORATE BUDGETS 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Health & Social care 
6.2 The Health & Social Care Partnership will report its first financial monitoring
for Perth & Kinross Integration Joint Board (IJB), for the financial year
2023/24, to the IJB’s Audit & Performance Committee on 18 September 2023. 
6.3 In setting the 2023/24 final Revenue Budget, the IJB approved the use of
Reserves to deliver a balanced position.  However, the financial position of the
IJB remains challenging due to health and social care continuing to face
recruitment challenges, increasing needs and complexities, uncertainty over
funding and rising costs particularly within prescribing. 
6.4 Any financial implications arising from the IJB will be reported to future
meetings of the Finance & Resources Committee. 
6.5 In relation to non-devolved functions there is currently a projected under
spend of £31,000 which is reflected in Appendix 1.   
Council Tax Reduction Scheme 
6.6 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.7 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements.  The following graph sets out both
variables over the current and previous six financial years.  The graph shows
a clear increase in the average weekly entitlement whereas the average
caseload has been more volatile but has returned to higher levels.
Page 17 of 136

Page 18

6.8 In the current financial year, the Council is supporting approximately 8,500
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.65 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £1.2 million
which is reflected in Appendix 1. 
7. REVENUE MONITORING – FUNDING 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 July 2023 together with
prior year comparative figures for the previous five financial years. 
Page 18 of 136

Page 19

7.4 Between 2018/19 and 2022/23, the average collection figure to 31 August
was 46%.  The actual collection figure to 31 August 2023 was 46.17% which
is an increase of 0.17% compared to the five-year average, but a 0.08%
reduction on the comparable position in 2022. 
7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
Page 19 of 136

Page 20

7.6 Given the 2023/24 collection rate that is set out at paragraph 7.4 above is
consistent with previous years, and that the growth in the number of Band D
equivalent properties is in line with expectations, it is currently anticipated that
Council Tax income is on target for the current year. 
Non-Domestic Rates 
7.7 The actual collection rate to 31July 2023 was 22.89%, compared to 24.06%
for the same period in 2022/23. 
8. REVENUE MONITORING – OTHER UPDATES 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 To date, no significant financial issues have been identified relating to Culture
Perth and Kinross or Perth Theatre & Concert Hall. 
8.3 Live Active Leisure finished 2022/23 with a revenue deficit of £203,000. For
2023/24, LAL has a budgeted deficit of £630,000, which it expects to rise to
£1.3 million in 2024/25. For 2023/24, LAL are funding the budgeted deficit
from their Reserves and at this stage, there is no ask of the Council. 
8.4 LAL’s projected deficits in 2021/22 and 2022/23 did not materialise, which is
positive. However, Council officers will work with LAL throughout the year on
best/worst/mid-range projections to ensure that the Committee has more
certainty about the likely year end position for 2023/24. This will be particularly
important to support work on the ALEO budget positions and SLA awards for
2024/25 given the continuing financial challenges which face the Council.
Page 20 of 136

Page 21

8.5 As part of the ALEO Transformation Review, Glasgow Audit will be
commissioned to review the financial resource position of each ALEO and
provide some analysis and commentary on financial sustainability and
governance. 
8.6 The long-term sustainability if the Council’s ALEOs across future financial
years will be kept under review with updates provided to future meetings of
the Finance & Resources Committee. 
Tayside Contracts 
8.7 The operating environment for Tayside Contracts remains challenging.  They
continue to experience significant inflationary pressures on the price of staple
foods – beyond that of the headline CPI and RPI rates quote more widely.   
8.8 Beyond that, negotiations on the 2023/24 pay award are still ongoing.  Should
the outcome of the negotiations exceed budgeted levels, without sufficient
external funding forthcoming, there is a risk that this will cause a further
significant risk to the profitability of Tayside Contracts. 
8.9 Tayside Contracts are in the process of identifying mitigating actions and the
three constituent Councils are looking at how they may assist.  Work will
continue between officers of the Council and Tayside Contracts to further
refine these projections. 
8.10 Both of these pressures may impact on the Council in the form of a request
for additional financial support, as has been the case in previous financial
years and / or the non-achievement of the budgeted income from the share of
Tayside Contract’s surplus. 
8.11 At this stage, the potential costs of providing additional financial support have
not been factored into the Council’s projections.  Any proposal to provide
additional funding to Tayside Contracts will be brought back to a future
meeting of the Finance & Resource Committee for approval by elected
members. 
8.12 In addition, given the financial challenges facing Tayside Contracts, there is a
risk that the budgeted amount from the Trading Operations surplus of
£550,000 will not be received in the current year. 
Housing Revenue Account 
8.13 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 3. 
8.14 Across the Housing Revenue Account activity there is a net projected under
spend of £110,000.  This is made up of additional income from Interest on
Page 21 of 136

Page 22

Revenue Balances and Recharges which is partially offset by IT system
upgrades and expenditure on decant costs. 
8.15 As a result of the variances identified above Capital from Current Revenue will
increase by £110,000. 
9. ISSUES ARISING FROM FINANCIAL YEAR 2022/23 
9.1 In completing the 2022/23 Unaudited Annual Accounts, two issues have been
identified which require adjustments to be made to the 2023/24 Management
Budget. 
Devolved School Management / Pupil Equity Fund Balances 
9.2 In setting the 2023/24 Final Revenue Budget on 1 March 2023 (Report No.
22/72 refers), the Council approved a projected Devolved School
Management (DSM) carry forward of £777,000.  However, the final under
spends (which included agreed planned carry forwards) on the DSM scheme
was £722,000 which is £55,000 less. 
9.3 Similarly, the Council approved a projected Pupil Equity Funding carry
forward of £300,000.  However, the final under spend was £140,000 which is
£160,000 less.  Schools spent 95% of their total Pupil Equity Funding in
2022/23, a significant improvement on previous years. 
9.4 ACTION: The Committee is requested to remove £215,000 from the
Education & Children’s Services to reflect the actual Devolved School
Management scheme and Pupil Equity Fund balances brought forward from
2022/23.  This adjustment is reflected in Appendix 1 (Column 3) to this report
and has no overall impact on the level of uncommitted Reserves. 
Revenue Grants 
9.5 Accounting arrangements under International Accounting Standards require
that, subject to certain conditions, revenue grants which were received by the
Council in 2022/23 but not utilised by 31 March 2023 should be accounted for
in Reserves at the end of the financial year.  Approval is therefore sought to
draw down £9.438 million in 2023/24 from the earmarked Reserve for
Revenue Grants.  These revenue grants are set out in detail in Appendix 4. 
9.6 Approval is now sought to adjust the budgets of Education & Children’s
Services (£1.639 million), Communities (£7.744 million) and Health & Social
Care (£55,000). 
9.7 ACTION: The Committee is asked to approve the adjustments totalling £9.438
million to the above Service budgets (set out in detail in Appendix 4), funded
from Reserves, to reflect revenue grants received in 2022/23 in respect of
expenditure which will not be incurred until 2023/24.  These additional
Page 22 of 136

Page 23

adjustments are reflected in Appendix 1 (Column 3) to this report and have
no overall impact on the budgeted level of uncommitted Reserves.
10. 2023/24 ADDITIONAL FUNDING 
10.1 Since the 2023/24 Revenue Budget was updated on 26 April 2023 (Report
No. 23/120 refers), the Council has been advised of additional funding for the
current financial year from several sources.  To ensure that the 2023/24
Management Budget continues to reflect the operational requirements of the
Council, several adjustments are required, which are summarised below and
included in Appendix 1 and Appendix 5. 
Scottish Government – Revenue Support Grant: 
• Teachers Pay Award 2023/24: £4.068 million (Education & Children’s
Services (ECS)) 
• Additional Funding for Summer Holidays: £98,712 (ECS)
• No-One Left Behind – Approach to Employability: £322,000
(Communities) 
10.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £4.489 million will be made through a
redetermination of the Council’s Revenue Support Grant.  It is therefore
necessary to adjust budgets for Education & Children’s Services and
Revenue Support Grant. 
10.3 ACTION: The Council is asked to approve the adjustments set out at
paragraph 10.2 which is reflected in Appendix 1 (Column 4) to this report. 
Other Funding 
10.4 Other funding amounting to £4.856 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 5. 
10.5 ACTION: The Committee is asked to note the receipt of £4.856 million of
additional resources, with this funding being reflected within Education &
Children’s Services, Communities and Health & Social Care as additional
grant income.  The current projected outturn assumes that all these additional
resources will be fully expended in 2023/24 or will be carried forward under
the terms of the grant award. 
11. 2022/23 VIREMENTS 
Contribution to/from Capital Fund 
11.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Page 23 of 136

Page 24

Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
11.2 The latest monitoring indicates a projected under spend on capital financing
costs (loan charges) of £130,000 based on the latest treasury management
activity and an increase of £633,000 in income from interest on revenue
balances due to rising rates.  This will result in an increased Contribution to
the Capital Fund of £763,000 in the current financial year. 
11.3 ACTION: The Committee is requested to approve the virement of £130,000
from the Capital Financing Costs (Loan Charges) Budget and £633,000 to
Interest on Revenue Balances with a corresponding increase in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 5) to this report. 
11.4 At 31 March 2023, the unaudited Annual Accounts included a Capital Fund
balance of £26.343 million.  The Capital Fund is currently projected to peak
in 2024/25 at approximately £31.6 million, before gradually reducing until fully
utilised in 2044/45. 
Service Virements
11.5 To ensure that the 2023/24 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 5) that have been
processed in line with the Scheme of Administration.   
12. 2023/24 MOVEMENTS IN RESERVES 
12.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves as at 31 March 2023 (per
unaudited Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2023/24, 2024/25 and 2025/26.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves.
12.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied. 
ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals.
Page 24 of 136

Page 25

12.3 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration. 
Balances Held Under Statute / Regulation 
12.4 The application of these earmarked Reserves was considered earlier in this
report in Section 9. 
Balances Held for Specific (Previously Approved) Purposes 
12.5 Theses earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
The proposals listed below are simply about the transfers in and out of
earmarked Reserves to take forward approved proposals. 
• Contribution to 2023/24 Revenue Budget - £12,000
• Culture - £31,000
• Financial Insecurity - £30,000
• Works Maintenance (River Ericht) - £200,000
• Project Feasibility Fund - £115,000
• Working Smarter - £15,000
Balances Held for Other Purposes 
12.6 The Transformation & Workforce Management earmarked Reserve was
created to provide the funding required to take forward the Transformation
and Change Programme as well as fund the financial implications of
workforce changes. 
12.7 The 2023/24 Revenue Budget, approved by Council on 1 March 2023
included funding to take forward a number of anti-poverty initiatives.  This
funding will also support work in 2024/25, therefore approval is sought to
transfer £74,000 from the Chief Executive’s Service to the earmarked
Reserve. 
12.8 In addition, approval is sought to transfer £52,000 from the Transformation &
Workforce Management earmarked Reserve to ensure completion of several
previously approved projects including mental health training and low carbon. 
12.9 ACTION: The Committee is asked to approve the net transfer of £22,000 to
the Transformation & Earmarked Reserve with adjustments reflected in
Appendix 1 (Column 5) to the report. 
12.10 Furthermore, under the Framework for Managing Workforce Change, the
authority to approve voluntary severance requests sits with the Executive
Leadership Team, except for requests from Chief Officers.  With that in mind,
Page 25 of 136

Page 26

approval is sought to draw down £178,000 from the Transformation and
Workforce Management earmarked Reserve to fund the voluntary severance
requests for seven officers across the Council.  These voluntary severance
requests will support the delivery of savings previously approved by Council
and payback in less than two years.   
12.11 ACTION: The Committee is asked to approve the transfer of £178,000 from
the Transformation & Earmarked Reserve with adjustments reflected in
Appendix 1 (Column 5) to the report. 
12.12 The Covid-19 earmarked Reserve is was originally created to address the
ongoing impact of the global pandemic.  Latterly it has supported initiatives
designed to mitigate against the cost of living. 
12.13 To that end, approval is sought to transfer funding to the Warm Welcome
Fund (formerly known as the Cost of Living Community Fund).  This funding
would be available for local community groups or organisations in Perth and
Kinross to apply for to provide activities and warm spaces for those struggling
with the cost of living over the winter months.  Groups are being encouraged
to work together to develop proposals which meet the needs of their local
communities.  To ensure that there are enough physical spaces and activities
to meet the needs of communities within every ward an additional £50,000 is
requested for the Warm Welcome Fund. 
12.14 ACTION: The Committee is asked to approve the transfer of £50,000 from the
Covid-19 earmarked Reserve to Communities for the Warm Welcome Fund. 
This adjustment is reflected in Appendix 1 (Column 5) to the report. 
12.15 Subject to approval of the proposals included within this report, the level of
earmarked Reserves will reduce to £30.361 million. 
12.16 When the implications of the revenue monitoring included within Appendix 1
are factored in, unearmarked Reserves reduce to £17.069 million (3.6%). 
Scottish Crannog Centre
12.17 On 1 February 2023, the Finance & Resources Committee agreed to
underwrite up to £210,000 of a contingency allowance for the Scottish
Crannog Centre (Report No. 23/30 refers). 
12.18 Following that decision, terms were confirmed with the project that this
funding would contribute to unforeseen necessary works, not additional works
or contract inflation. 
12.19 The works on the Scottish Crannog Centre are progressing with a planned
completion in Christmas 2023.  Currently additional costs are being forecast
for third party utilities connections, additional remedial works to existing
buildings, additional external works only visible once on site and clarifications
in specifications.   The Scottish Crannog Centre has subsequently requested
Page 26 of 136

Page 27

an interim drawdown of £93,000 of the contingency funding from the Council.
Additional requests may be made before the contract completes. 
12.20 ACTION: The Committee is asked to approve the transfer of £93,000 from
unearmarked Reserves to Communities to support the Scottish Crannog
Centre.  This adjustment is reflected in Appendix 1. 
13. FINANCIAL RISKS 
13.1 In preparing the Council's 2023/24 Revenue Monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
13.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
13.3 Going forward, new risks will be captured within the body of the report with a
summary being maintained in Appendix 7.   
Budgeted Slippage on Teaching Posts 
13.4 Across all Council Services there is an approved staff slippage target of 4%. 
The ability to manage this target is limited in early learning and childcare and
school settings due to the requirement to fill all vacancies as they arise.    It is
also challenging due to the national requirement to maintain the teacher
number ratio.  Teaching slippage targets are currently not being met across all
school settings. 
13.5 As the financial year progresses, Education & Children’s Services will be able
to quantify the impact on delivery of the 2023/24 Revenue Budget.  If the
requirement to maintain the ratio is continued beyond the current financial
year, this will inevitably put further pressure on Revenue Budgets as well as
restrict where future savings may be drawn from. 
Services for Children, Young People and Families 
13.6 The 2023/24 Revenue Budget, agreed by Council on 1 March 2023 (Report
No. 23/72 refers) includes additional non-recurring funding of £1.952 million
for Services for Children, Young People & Families budget for 2023/24.  Had
this additional funding not been provided, the Services for Children, Young
People & Families would likely show a projected over spend of £2 million. 
13.7 The levels of need remain high following the impact of Covid-19.  Recruitment
and retention challenges have further exacerbated the situation. 
Notwithstanding the additional temporary staffing in place, there remains a
risk to future revenue Budgets.  Future budget projections do not allow for the
£380,000 of funding for the REACH team.
Page 27 of 136

Page 28

Financial Insecurity Funding 
13.8 The Council has directed significant levels of non-recurring funding towards
the Scottish Welfare Fund and the Financial Insecurity Fund to support
vulnerable individuals and families with the cost-of-living pressures in recent
years. In addition, the Council has received external funding which it has also
directed to provide additional support. 
13.9 As things stand, this additional funding will not be available in 2024/25.  This
will likely result in the Council having to raise the priority rating for the Scottish
Welfare Fund to “high, most compelling”, which would be a first for Perth &
Kinross Council.  It may result in the provision of less dignified support during
times of crisis and push households in crisis to community groups that would
struggle to cope with the demand.  It may also cut across the ambition of
Cash-First. 
13.10 In the current financial year, the Scottish Welfare Fund and Financial
Insecurity Fund has had non-recurring additional funding of £600,000 and
£500,000 respectively applied to them. 
2023/24 Pay Awards 
13.11 The non-teaching pay awards for 2023/24 have not yet settled.  There is a risk
to both the current year, and future years that the final increases exceed both
the current budgetary provision and external funding made available by the
Scottish Government. 
13.12 Any shortfall could lead to further pressures on Reserves and / or cuts in
service delivery. 
Tayside Contracts 
13.13 There is a risk that the Council is required to provide additional funding for
Tayside Contracts to contribute towards higher inflation costs, reduced
demand for school meals and a pay award that exceeds budgeted levels. 
14. CONCLUSION 
14.1 Based on the June 2023 ledger, a projected over spend of £1.008 million has
been identified in the current financial year. 
14.2 This level of projected over spend will result in a reduction in the level of
unearmarked Reserves to £17.069 million or 3.6%. 
14.3 The financial position of the Council and its partners and ALEOs remains
challenging and regular updates will be provided to the Council and the
Finance & Resources Committee as the position develops. 
Page 28 of 136

Page 29

APPROVED 
Name  Designation Date
Stewart Mackenzie  Head of Finance 31 August 2023
Karen Donaldson  Chief Operating Officer 31 August 2023 
Page 29 of 136

Page 30

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
Page 30 of 136

Page 31

2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
2.4 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
2.5 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.    
Page 31 of 136

Page 32

4. Consultation 
Internal 
4.1 The Executive Leadership Team have been consulted in the preparation of
this report. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix 1 – 2023/24 Management Budget
• Appendix 2 – General Fund 2023/24 Projected Outturn – Service
Analysis
• Appendix 3 – Housing Revenue Account 2023/24 Projected Outturn
• Appendix 4 – Revenue Grants
• Appendix 5 – Other Fundings
• Appendix 6 – General Fund Balances
• Appendix 7 – Financial Risks 
Page 32 of 136

Page 33

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
2023/24 Previously Issues Movements Virements Movements 2023/24 Projected Variance Variance
Council Approved Arising in in Revised Outturn to to
Approved Adjustments From Funding Reserves Mgt Revised Revised
Budget (Net) 2022/23 Budget Mgt Mgt
Accounts Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 1
Service Budgets
Education & Children's Services 230,985 234 1,424 4,167 41 236,851 236,851 0 0.0%
Communities 70,439 232 7,744 322 320 496 79,553 79,693 140 0.2%
Corporate & Democratic Services 39,596 912 (220) 25 40,313 40,031 (282) (1%)
Chief Executive Service 3,712 1,235 (68) 134 5,013 4,994 (19) (0%)
Sub - Total: Service Budgets 344,732 2,613 9,168 4,489 32 696 361,730 361,569 (161) (0.0%)
SECTION 2
Corporate Budgets
Health & Social Care 83,958 3,084 55 (100) 6 87,003 86,972 (31) (0%)
Contribution to Valuation Joint Board 1,309 1,309 1,309 0 0.0%
Capital Financing Costs 15,137 (130) 15,007 15,007 0 0.0%
Interest on Revenue Balances (5054) (633) (5,687) (5,687) 0 0.0%
Net Contribution to/(from) Capital Fund 3,099 763 3,862 3,862 0 0.0%
Contribution to/(from) Insurance Fund 200 200 200 0 0.0%
Trading Operations Surplus (550) (550) (550) 0 0.0%
Support Service External Income (2153) (2,153) (2,153) 0 0.0%
Tayside Pension Fund 1,725 (70) 1,655 1,655 0 0.0%
Apprenticeship Levy 818 138 956 956 0 0.0%
Council Tax Reduction Scheme 6,200 6,200 7,400 1,200 19.4%
Discretionary Relief 1,104 1,104 1,104 0 0.0%
Net Expenditure (General Fund) 450,525 5,697 9,223 4,489 0 702 470,636 471,644 1,008 0.2%
SECTION 3
Funding
Revenue Support Grant (239,627) (3,722) (4,489) (247,838) (247,838) 0 0.0%
Ring Fenced Grant (17,725) 4 (17,721) (17,721) 0 0.0%
Non Domestic Rate Income (60,754) (60,754) (60,754) 0 0.0%
Council Tax Income (103,914) (103,914) (103,914) 0 0.0%
Capital Grant (1,600) (30) (1,630) (1,630) 0 0.0%
Total Financing (423,620) (3,748) 0 (4,489) 0 0 (431,857) (431,857) 0 0.0%
Financed from/(returned to) Reserves 26,905 1,949 9,223 0 0 702 38,779 39,787 1,008
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2023/24 REVENUE
BUDGET - SUMMARY
4
Page 33 of 136

Page 34

Page 34 of 136

Page 35

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 June 2023)
Variance Variance
£'000 £'000
Education & Children's Services
Total 0
DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
There are 66 primary schools, 7 secondary schools, 4 all through schools, 46 nurseries and early learning
centres and 1 special school within the Council's DSM scheme.  Each school has an individual budget, primarily
based on pupil numbers.  Headteachers are responsible for the annual budgets devolved to them in April each
year. The total DSM budget for 2023/24 is £132.051 million including carry forwards. 
Within the scheme there is a facility allowing for DSM balances, whether surplus or deficit, to be brought
forward from the previous financial year. In addition to the resources devolved, balances may also be available
to headteachers of schools that have a carry forward. In 2022/23, £722,000 of DSM balances were brought
forward.
The Devolved School Management Scheme is currently on budget. Schools are experiencing challenges in
achieving staff slippage targets.
Pupil Equity Fund
(100) The majority of schools within Perth & Kinross Council have been allocated a share of £1.874 million of Pupil
Equity Funding from the Scottish Government as a ring fenced grant.  Schools are being instructed to use this
year’s PEF Grant by 31 March 2024 as per the revised Scottish Government guidance. At this time £100,000 is
projected to be carried forward into 2024/25 for teacher and support staff costs to the end of the current
academic year.
100 Projected carry forward of Pupil Equity Funding.
NON DEVOLVED
Education Services
Nursery Sector
(400) Additional slippage due to turnover of staff and appointments at the lower end of pay scales.
(32) Projected under spend on non domestic rates.
88 Projected under recovery of income due to reduced attendances at Kids Clubs
Primary Sector
1,187 Slippage target currently not being met within primary sector due to requirement to maintain teacher numbers.
(312) Education Recovery funding applied towards slippage target.
Secondary Sector
48 Staff slippage target not being met.
8 Increased loan charges due to interest rate rises.
Special Sector
(270) Additional slippage due to recruitment challenges, particularly for pupil support assistants.
28 Increased loan charges due to interest rate rises.
Services for Children, Young People & Families
(19) Projected under spend taking account of non-recurring funding of £800,000 provided for 2023/24.
84 Projected over spend on legal fees and translation / interpreter services
84 Projected over spend on client travel.
(255) The budget for young people with complex behavioural issues, which includes a number of pupils placed within
residential schools, is projected to under spend following the provision of £1.152 million of non-recurring
53 Projected over spends on Kinship Care (£32,000), Foster Care (£14,000) and Adoption (£7,000) due to
increased demand.
46 There is a projected over spend in relation to supporting care experienced young people (continuing care,
supported accommodation) due to a doubling of the number of DWP clients. 
94 There is a projected over spend on self directed support (children & disability team - respite provision) due to
the level of demand and an increase to the hourly rate paid to clients.
(107) Additional grant funding including Unaccompanied Asylum Seeking Children (£84,000) and Wellbank rental
income (£23,000).
SERVICE Summary of Service Variances
4
Page 35 of 136

Page 36

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 June 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Business and Resources Services
(70) Additional slippage due to turnover of staff.
19 Reduced income from school lets due to reduction in take up as well as closure of Perth High School pitch.
Catering Services
(500) Projected under spend within the Early Learning & Childcare 1140 grant for nursery meals based on latest
uptake.
(74) Projected net under spend on school meals due to uptake.
300 Projected reduction in school meal income.
Page 36 of 136

Page 37

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 June 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Communities
Total 140
ENVIRONMENTAL AND CONSUMER SERVICES
Regulation
25 Projected shortfall in Corporate Health and Safety income
Operations
35 Additional hire costs for refuse collection vehicles
Fleet Management
(115) Saving on loan charges due to slippage on planned vehicle replacement programme
100 Additional cost of vehicle materials and repairs
Waste Strategy
40 Additional consultancy costs to support the review of operational assets.
Bereavement Services
(40) Additional income from Bereavement Services
PLANNING AND DEVELOPMENT
30 Perth Harbour - projected increase in operating costs /shortfall in income
HOUSING
20 Projected increase in energy costs at Greyfriars Hostel
20 Void Rent Loss for housing support properties
BUSINESS AND RESOURCES
Public Transport Unit / Car Parking Account
25 Perth Bus Station - increased costs
Page 37 of 136

Page 38

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 June 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Corporate & Democratic Services
Total (282)
Legal & Governance Services
(102) Projected under spend on staff costs.
(30) Projected under spend on supplies and services across the function.
(24) Projected additional income from licensing and recharges
Finance
43 Over spend on external audit fee following increase in charges.
Human Resources
(24) Projected under spend on staff costs.
12 Projected over spend on supplies and services.
Information Technology and Revenues & Benefits
(148) Projected under spend on Housing Benefit Subsidy based on latest activity.
(9) Minor net under spends.
Property
468 Projected overspend on property maintenance across the Council estate
(237) Projected under spend on energy based on consumption to date.
(231) Projected under spend on Pullar House due to updated inflation assumptions
Chief Executive Service
Total (19) Core Costs
(19) Staff slippage and additional income
TOTAL (161)
Page 38 of 136

Page 39

APPENDIX 3
PERTH & KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2023/24 PROJECTED OUTTURN
(Based on expenditure to 30 June 2023)
£'000
(69) Housing Repairs
Staff slippage (£72,000), partially offset by additional property costs (£3,000).
10 Improvements
Projected over spend on staff costs.
161 Letham, North & South
Projected over spends on IT costs (£90,000), staff costs (£20,000), decant costs in relation to burst pipes (£26,000), garden
maintenance (£31,000), cleaning (£5,000) and other non-staff related budgets (£9,000).  These are partially offset by a projected under
spend on sheriff officer fees (and related income) (£20,000).
45 Perth City and Specialist
Projected over spends on staff costs (£45,000) and decant costs / disturbance payments relating to burst pipes (£18,000).  These are
partially offset by additional income from the Common Housing Register (£18,000).
12 Housing Management
Projected over spend on staff costs.
(45) Administration
Increased net income from recharges to and from the Housing Revenue Account
(224) Income
Additional income from interest on revenue balances (£239,000) partially offset by reduced commercial rentals (£15,000).
110 Capital Financed from Current Revenue
As a result of the projected net under spends highlighted above, this is the increase in the amount available to invest in the HRA
capital programme from the Revenue Budget.
0
Summary of Service Variances
4
Page 39 of 136

Page 40

Page 40 of 136

Page 41

APPENDIX 4
Revenue Grants
Education & Children’s Services
Whole Family Wellbeing £781,000
Education Recovery £255,000
Care Experienced Children and Young People £159,000
Other Grants £444,000
Communities
Ukraine Tariff Funding £4,521,000
Place Based Investment Programme £1,042,000
Discretionary Fund £409,000
Young Persons Guarantee £196,000
Parental Employability Support Fund £212,000
Other Grants £1,364,000
Health & Social Care
Other Grants £55,000
TOTAL £9,438,000
4
Page 41 of 136

Page 42

Page 42 of 136

Page 43

APPENDIX 5
Other Grant Funding
Education & Children’s Services
Scottish Government – Community Mental Health & Wellbeing £423,000
Scottish Government – Justice Social Work Service - Support Pandemic Recovery Work £311,966
Scottish Government – Ukraine Education Tariff £187,798
Gannochy Trust – Universal Youth Service Partnership £153,402
Communities
Scottish Government – No One Left Behind £1,770,000
Scottish Government – Place Based Investment Programme 23-24 £766,000
Scottish Government – Delivery of Rural Community Led Local Development Funding 23-
24 £326,186
Scottish & Southern Electricity Networks – Community Resilience £200,000
Scottish Government – Warm Scottish Welcome £160,000
UK Government – Homes for Ukraine £157,920
Paths for All – Smarter Choices, Smarter Places 23-24 £137,800
Paths for All – Smarter Choices, Smarter Places 23-24 PTU £95,000
Scottish Government – Vacant & Derelict Land Investment Programme £93,809
Health & Social Care
UK Government – Asylum Dispersal Scheme Grant £73,000
TOTAL £4,855,881
4
Page 43 of 136

Page 44

Page 44 of 136

Page 45

Appendix 6
General Fund Reserves Update
Proposals
Included in
Report
31/3/23 2023/24 2024/25 2025/26 Balance
£m £m £m £m £m £m
General Fund Balance 70.046
Balances Held Under Statute / Regulation
- Revenue Grants (16.270) 0.800 9.278 (6.192)
- Council Tax Income for affordable housing (4.353) (0.083) (0.283) (0.283) (5.002)
- Developers Contributions: Affordable Housing (4.298) (4.298)
- Car Parking (1.512) (1.512)
- Developers Contributions: Commuted Sums (1.242) (1.242)
- Devolved School Management (0.722) 0.777 (0.055) 0.000
Sub total (28.397) 1.494 (0.283) (0.283) 9.223 (18.246)
Balances Held for Specific (Previously Approved) Purposes 0.000
- Services for Children, Young People & Families (2.139) 1.858 (0.281)
- Contribution to 2023/24 Revenue Budget (1.699) 1.687 0.012 0.000
- Perth High School (1.446) 0.450 0.312 (0.684)
- Culture (1.172) 0.031 (1.141)
- Learning Estate Decants (0.700) 0.700 0.000
- Financial Insecurity (0.680) 0.650 0.030 (0.000)
- School Counsellors (0.556) 0.227 0.227 0.102 0.000
- Works Maintenance (0.400) 0.200 (0.200)
- Bertha Park High School (0.347) 0.274 (0.073)
- Modern Apprentice Scheme (0.340) (0.340)
- Project Feasibility Fund (Covid-19) (0.279) 0.115 (0.164)
- Cemetery Walls (0.271) 0.076 0.076 0.076 (0.043)
- Primary School at Bertha Park (0.270) (0.270)
- Perth and Kinross Offer (0.252) 0.252 0.000
- PH20 (0.212) 0.150 (0.062)
- Working Smarter (Covid-19) (0.194) 0.015 (0.179)
- UCI Cycling World Championships (0.180) 0.180 0.000
- Climate Change (0.153) (0.153)
- Ventilation Measures (0.114) 0.090 (0.024)
- Salix (0.113) (0.113)
- Local Area Partnerships (0.090) (0.090)
- Community Investment Fund (0.089) 0.051 (0.038)
- Grounds Maintenance ( A9/A85) (0.060) 0.060 0.000
- Local Government Elections 0.000 (0.053) (0.053) (0.053) (0.159)
- Financial Assistance (Mod) 0.000 (0.020) (0.020) (0.020) (0.060)
Sub total (11.756) 6.632 0.542 0.105 0.403 (4.074)
Balances Held for Other Purposes 0.000
- Transformation & Workforce Management (9.530) 2.638 0.260 0.060 0.206 (6.366)
- Covid-19 (2.193) 0.479 0.040 (1.674)
Sub total (11.723) 3.117 0.300 0.060 0.206 (8.040)
Earmarked Reserves (51.876) 11.243 0.559 (0.118) 9.832 (30.360)
Uncommitted General Fund Balance 18.170
Impact of Current Year Projected Outturn (1.008)
Commitments from unearmarked Reserves (0.093)
Updated Uncommitted General Fund Balance 17.069
Percentage of Net Revenue Budget 3.6%
Approved
Contributions from / (to)
Reserves
4
Page 45 of 136

Page 46

Page 46 of 136

Page 47

Appendix 7
FINANCIAL RISKS
Risk to Revenue Budget Mitigation
1 Achievement of staff slippage targets, particularly
relating to teacher numbers and impact on pupil /
teacher ratio
- Proactive workforce
management
- Revenue monitoring
- Future budget submissions
2 Increasing demand / need / complexity for services
for children, young people and families and
reducing budgets.
- Proactive management
- Revenue monitoring
- Future budget submissions
3 Ceasing of additional Financial Insecurity Funding
on 31 March 2024.
- Proactive management
- Revenue monitoring
- Future budget submissions
4 Current year non-teaching pay awards - Revenue monitoring
- Future budget submissions
5 Support for Tayside Contracts - Tayside Contracts
Governance & Strategy Group
- Revenue monitoring
- Future budget submissions
4
Page 47 of 136

Page 48

Page 48 of 136

Page 49

PERTH & KINROSS COUNCIL 
Finance & Resources Committee 
13 September 2023 
COMPOSITE CAPITAL BUDGET 2023/28 & HOUSING INVESTMENT
PROGRAMME 2023/28 – MONITORING REPORT NUMBER No.1 
Report by Head of Finance
(Report No. 23/243) 
1. PURPOSE 
1.1 This report provides a summary position to date for the 5-year Composite
Capital Budget and the 5-year Housing Investment Programme for 2023/24 to
2027/28 and seeks approval for adjustments to the programmes. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
(i) notes the contents of this report.
(ii) approves the proposed adjustments to the five-year Composite Capital
Budget 2023/24 to 2027/28 set out in Sections 5 and 6 of this report
and summarised in Appendices I and II.
(iii) approves the proposed adjustments to the Housing Investment
Programme Budget 2023/24 to 2027/28 set out in Section 7 of this
report and summarised in Appendix III. 
3. STRUCTURE 
3.1 This report is structured over the following sections. The format of the report
has been updated in light of elected member feedback from workshop
sessions held in July : 
• Section 4: Background / Main Issues
• Section 5: Composite Capital Programme – Gross Capital Resources
• Section 6: Composite Capital Programme – Expenditure
• Section 7: Housing Investment Programme
• Section 8: Summary 
4. BACKGROUND / MAIN ISSUES 
4.1 The Finance & Resources Committee approved an updated six-year gross
Composite Capital Budget for 2022/23 to 2027/28 totalling £727,448,000 and
a five-year gross Housing Investment Programme for 2022/23 to 2027/28
totalling £87,018,000 at its meeting on 26 April 2023 (report 23/121 refers). 
5
Page 49 of 136

Page 50

4.2 This report advises on the impact of the final outturn expenditure in 2022/23
on the programmes; expenditure to 31 July 2023, and the latest estimate of
the projected outturn for each of the years to 2027/28 for the Composite
Programme and for the Housing Investment Programme.
5. COMPOSITE CAPITAL PROGRAMME – GROSS CAPITAL RESOURCES 
5.1 The current estimated total gross capital resources (which includes
movements in Capital Receipts, Capital Grants, Contributions and borrowing)
available over the five years 2023/24 to 2027/28 amount to £623,150,000.
Movements from the revised Composite Capital Budget approved on 26 April
2023 for these five years are summarised in the table below, and the
constituent elements for each year are shown in Appendix I. 
Total Gross Composite Capital Resources 
Approved 
26 April 2023
Current
Estimate
Movement 
£’000 £’000 £’000
2023/24 198,729 202,214 3,485
2024/25 193,284 196,980 3,696
2025/26 109,577 110,535 958
2026/27 65,408 65,942 534
2027/28 46,605 47,479 874
Total 613,603 623,150 9,547  
5.2 The monitoring position has been updated for amounts carried forward from
2022/23 as reflected within the unaudited accounts. The overall movement in
the total Gross Resources for the 5 years 2023/24 to 2027/28 shown at
Section 5.1 above can be summarised as follows: 
£’000
Resources Brought-forward from 2022/23: 
Property Receipts, including carried forward to future years 98
Capital Grants 332
Tay City, Developer, Other Third Party and Revenue
Contributions
1,339
Borrowing 6,045
Total Resources Brought-forward from 2022/23 7,814  
Increase in Resources from current monitoring: 
Increase in Commercial Property and other Receipts 381
Increase in Capital Grants (Section 5.3) 151
Increase in Third Party, Revenue and Developer
Contributions (Section 5.4) 
1,201
Total Increase in Gross Capital Resources (Section 5.1) 9,547 
Page 50 of 136

Page 51

5.3 There is a net increase of £151,000 in capital grants for various programmes
listed below. These have been reflected in the proposed expenditure budgets
for these programmes, and are included in Appendix II, as follows: 
• £353,000 Nature Restoration included in the General Capital Grant
(Section 6.3.5)
• £30,000 Cycling Walking & Safer Streets (Section 6.3.2)
• Less a reduction of £208,000 from the Recycling Improvement Fund
(Section 6.3.8), and £24,000 for Gypsy Traveller Site Improvements
(Section 6.3.11), reflecting reduced expenditure on the schemes. 
5.4 Third Party Contributions have increased by £1,148,000. These relate to
£150,000 from TACTRAN for the Cycling Walking & Safer Streets programme
(Section 6.3.2), £109,000 from the Forestry Commission for Timber Routes
(Section 6.3.3) and £889,000 from Scottish Water on the Commercial
Property Investment Programme (Section 6.3.10). Revenue Contributions
have increased by a net total of £53,000, with an increased contribution of
£125,000 on the Mosaic Implementation Programme (Section 6.4.3), less a
reduction in the funding of £72,000 required from the Salix Reserve (Section
6.4.2). 
5.5 The projected borrowing requirement in 2023/24, which is effectively the
balancing item for resources, is £152,394,000. This is £974,000 higher than
the borrowing requirement approved on 26 April 2023. This comprises
£6,045,000 of borrowing originally budgeted in 2022/23 which has been
brought forward to 2023/24, less a reduction of £5,071,000 arising from the
current monitoring exercise. 
5.6 The total new borrowing requirement in the subsequent years 2024/25 to
2027/28 has increased by £5,071,000 to £345,480,000, resulting in no overall
change in the total level of borrowing across the whole 5-year programme.
The movement in borrowing (excluding the amount brought-forward) is
summarised as follows: 
2023/24 2024/25 2025/26 Later
Years
Total 
£’000 £’000 £’000 £’000 £’000
Movements arising from re-
phasing of expenditure and
receipts (Appendix II)
(5,071) 2,830 958 1,283 0
Increase/(Decrease) in
Borrowing Requirement
(5,071) 2,830 958 1,283 0 
5.7 The chart below shows the Capital Resources required to fund the 2023/24
Composite Capital Programme following the proposed budget adjustments
detailed in this report.
Page 51 of 136

Page 52

6. COMPOSITE CAPITAL PROGRAMME – EXPENDITURE 
6.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme 
6.1.1. Total expenditure (net of grants and contributions) to 31 July 2023 on the
Composite Capital Programme amounts to £40,660,000, which is detailed in
Appendix II and summarised as follows: 
Net Expenditure
to 31 July 2023 
£’000
Education & Children’s Services  13,079
Communities 26,242
Health and Social Care    64
Corporate & Democratic Services 1,275
Total 40,660 
6.1.2. A comprehensive monitoring exercise has been carried out, which is detailed
in Appendix II, which also includes the various brought forward adjustments
from 2022/23 as outlined in Section 5 above. The most significant features
are discussed below.
6.1.3. In common with all Scottish local authorities and public and private sector
bodies, the Council has experienced significant inflationary pressures on the
delivery of its Capital investment programme over the past few years. 
6.1.4. The early estimate for the BCIS All-in Tender Price Index, which shows the
general movement on construction pricing, forecasts a 1.1% increase
between Q1 2023 and Q2 2023 which represents an increase of 4.9% in the
year from Q2 2022. By comparison the increase in the year to Q2 2022 from
75.4%
20.3%
0.6%
1.4%
0.9%
1.5%
4.4%
Projected Capital Resources 2023/24
(August 2023)
Borrowing (£152.394M)
Grants (£40.975M)
Tay City Deal (£1.257M)
Developer Contributions (£2.847M)
Third Party & Revenue Contributions (£1.732M)
Receipts (£3.009M)
£Million
Page 52 of 136

Page 53

Q2 2021 was 10.3%. While construction costs continue to rise, this forecast
indicates that the rate of increase is beginning to reduce. 
6.2 Education and Children’s Services 
6.2.1 The Executive Director (Education & Children’s Services) has reviewed the
programme for their Service and proposes the following budget adjustments.
6.2.2 It was previously agreed that the upgrade works at Kirkmichael Primary
School would be funded by a ring-fenced receipt from the sale of the former
Straloch Primary School. The actual amount received for Straloch Primary
exceeded the original estimate resulting in a further £28,000 for additional
upgrades at Kirkmichael Primary School. 
6.2.3 The remaining budget adjustments reflect timing differences on various
projects, with the main proposed movements detailed in the table below: 
Project 2023/24
£’000
2024/25
£’000
Later Years
£’000
Description
Technology
Upgrades
(250) 0 250 Works programme rephased and
extended to the summer
holidays in 2025
Harris Academy (150) 150 0 The refurbishment of existing
classrooms within the project to
be undertaken in summer
holidays 2024 
6.2.4 There are several other small adjustments to various Education & Children’s
Services projects relating to amounts carried forward from 2022/23 which are
included in Appendix II. These mostly relate to projects that have been
completed. All of the above proposed adjustments have been reflected in
Appendices I & II. 
6.3 Communities 
6.3.1 The Executive Director (Communities) has reviewed the programme for their
Service and proposes various budget adjustments, the most significant of
which are described below.
6.3.2 Within Traffic & Road Safety, TACTRAN have provided a £150,000 Third
Party Contribution towards the Cycling, Walking and Safer Routes (CWSR)
programme. This is supplemented by an increase in the Scottish Government
Grant of £30,000 which is proposed to be allocated to the Schools Road
Safety Measures budget (£28,000) and the CWSR budget (£2,000) in the
current year. 
6.3.3 With Asset Management – Roads & Lighting, the Forestry Commission have
allocated an additional £109,000 to the Council towards Timber Routes, which
is included within the Structural Maintenance programme. This has been
Page 53 of 136

Page 54

added to the 2023/24 budget which, when combined with an acceleration of
budget from future years, increases the budget in the current year by
£394,000. 
6.3.4 Springfield have advised the Council that they will not construct the Perth
Transport Futures Phase 3 Bertha Park Link Road themselves, and instead
have exercised their legal right to provide an agreed sum through developer
contributions over time as house sales are completed. Therefore, it has now
become necessary for the Council to undertake the detailed design work for
the road. It is proposed that up to £500,000 of the contingency included within
the Phase 2 CTLR project is utilised for this design work, and that options for
funding the construction, including the use of developer contributions, is
considered by Council when it sets the next Capital Budget in February next
year. 
6.3.5 The Scottish Government has also allocated £353,000 to the Council for the
Nature Restoration programme in 2023/24. This has therefore been added to
the current year budget within the Other Planning programme, with the grant
added to the Council’s General Capital Grant. The budget is also augmented
by a small rounding adjustment of £1,000. 
6.3.6 Within the City Centre Developments – Cultural Attractions programme, the
construction phase of Perth Museum is now complete and the project remains
within the total approved budget, with only final fit-out works ongoing, prior to
its opening in the spring of next year. 
6.3.7 The Letham Hub project is scheduled to conclude prior to Christmas 2023.
Members are advised that the contractor has submitted a number of claims
for an extension of time and a corresponding substantial financial claim. This
is currently being evaluated and will be subject to ongoing discussion with the
contractor. There is no request for additional funding at this time. 
6.3.8 Within Waste Strategy, a reduction in expenditure of £208,000 has also meant
the level of grant funding from the Recycling Improvement Fund has been
reduced by a corresponding amount in the current year. 
6.3.9 During the cyclical condition survey programme the roof structure of the
Friarton Waste Transfer Station has been found to have incurred severe
corrosion. Engineering advice is that the building and surrounding area may
be at risk in the event of winter storms and/or heavy snow and remedial action
has therefore been instigated at an estimated cost of £250,000 in 2023/24
which will be met from the Property Compliance Works Programme.
Operational plans will be put in place by Communities to redirect waste to
alternative locations from October. An update on the investment requirements
on the Council’s operational estate will be included as part of the Corporate
Asset Management Plan to Council in December. 
Page 54 of 136

Page 55

6.3.10 Within the Commercial Property Investment Programme, the costs to deliver
the Broxden Drainage Mitigation Works have been revised with an additional
£401,000 required in the current year and £866,000 next year for the full
required works to be undertaken. Scottish Water are providing a contribution
to the cost of the project, with an additional £231,000 this year and £658,000
next year. It is proposed that the remaining costs are met from the
Commercial Receipts which have been brought forward. After allowing for
other adjustments to the programme, this results in a net increase in
expenditure of £353,000. 
6.3.11 The various programmes of works for the Gypsy Traveller Sites are being
reviewed, and specific proposals will be considered at a future meeting of this
Committee. However, reduced expenditure of £24,000 on one of the grant
funded schemes which originated in 2021/22 has resulted in a reduction in
grant for the project, which has been reflected in Appendix I and II. 
6.3.12 There have been several other small adjustments to various Communities
projects relating to amounts carried forward from 2022/23 which are included
in Appendix II. These mostly relate to projects that have been completed or
rounding adjustments. All the above proposed adjustments have been
reflected in Appendices I & II. 
6.4 Corporate & Democratic Services 
6.4.1 The Chief Operating Officer has reviewed the programme for their Service and
proposes the budget adjustments described below. 
Property Services 
6.4.2 It is proposed to reduce the Energy Efficiency Works funded from the Salix
Reserve by £72,000, due to the complexities of installing the heating control
systems in some buildings. 
Information Systems & Technology 
6.4.3 The planned go-live date for the new Mosaic system has been moved from
March 2024 to 1 April 2024. Therefore, this results in the full licence costs now
being chargeable to new financial year when the system goes live, with only
staff costs for the ongoing development and implementation being incurred in
the current year. In addition, it also means that a further year of the current
Revenue Contributions is available to meet some of the costs of the project in
2026/27. The budget has therefore been rephased for these proposed budget
adjustments and been included in Appendix II.
6.4.4 The remaining budget adjustments reflect timing differences on various
projects, with the main proposed movements detailed in the table below:  
Page 55 of 136

Page 56

Project 2023/24
£’000
2024/25
£’000
Later Years
£’000
Description
Property -
Decarbonisation 
(1,300) 1,300 0 Following a review of the work to
be undertaken in the new
project, the budget has been
rephased to reflect staff capacity
and procurement timescales.
ICT Infrastructure
Replacement &
Upgrade Programme
(354) (721) 1,075 The Programme has been
rephased to align with
infrastructure replacement
projects & licensing
requirements. 
IST – Data & Analytics  (442) 164 278 Rephasing of the Data
Management Programme
IST – Supporting
Digital
(564) 141 423 Works to be planned around the
re-procurement of various digital
platforms.
School audio-Visual
(AV) Replacement
Programme
(798) 173 625 The programme has been
rephased to align with
replacement plans and other
property related project work. 
6.4.5 Al the above proposed adjustments, together with other small movements,
have been reflected in Appendix II. 
6.5 Health & Social Care 
6.5.1 The Developing Supported Tenancies project is a contribution towards works
within the Housing Revenue Account. It has been confirmed that the budget of
£229,000 will not be required in the current year and it is therefore proposed
that the budget is moved to next year whilst options continue to be evaluated. 
6.5.2 The above proposed adjustment has been reflected in Appendix II. 
7. HOUSING INVESTMENT PROGRAMME 
Final Outturn 2022-23 
7.1 The final position for 2022/23 on the Housing Investment Programme (subject
to audit) was as follows: 
2022/23
Budget 
Actual to 31
March 2023
Variance to
Budget 
£’000 £’000 £000
Total Net Expenditure 18,180 13,856 (4,324)
Total Receipts & CFCR (2,652) (2,741) (89)
Borrowing Requirement 15,528 11,115 (4,413) 
Page 56 of 136

Page 57

7.2 In order to determine the carry-forward adjustments to 2023/24 required for
each project, the difference between the 2022/23 actuals and previous
projections are adjusted against the 2023/24 budgets. These adjustments are
neutral over the 2 years and has resulted in a movement of £4,413,000 of
borrowing from 2022/23 to 2023/24 and is shown in Appendix III.   
Current Programme: 2023/24 to 2027/28 
7.3 The current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2023/24 to 2027/28 amounts to
£92,205,000. Movements from the previous estimates approved by the
Finance & Resources Committee on 26 April 2023 are summarised in the
table below and detailed in Appendix III. 
Approved 
26 April 2023
Current
Estimate
Movement 
£’000 £’000 £’000
2023/24 20,422 27,597 7,175
2024/25 13,853          13,744 (109)
2025/26 15,519 17,253 1,734
2026/27 19,044 19,044 0
2027/28 19,044 14,567  (4,477)
Total 87,882 92,205 4,323 
7.4 The increase in resources of £4,323,000 represents £4,413,000 brought
forward from 2022/23, less the increase in CFCR of £90,000 applied in
2022/23 which has not been carried forward. 
7.5 Total Expenditure to 31 July 2023 (Housing Investment Programme) 
Net expenditure for 2023/24 to 31 July 2023 amounts to £5,015,000. As there
have been no receipts, this therefore means that the borrowing requirement
for the year to date is also £5,015,000. 
7.6 After making adjustments relating to small carry-forward amounts from last
year, which are included in Appendix III, the Executive Director (Communities)
has reviewed the Housing Investment Programme and proposes further
budget adjustments outlined below.
7.7 It is proposed to draw-down a total of £4,477,000 from the SHQS Future
Developments budget in 2027/28 and to allocate this across various
programmes as follows: 
• Heating Upgrades - £700,000 allocated to each of the years 2023/24,
2024/25 and 2025/26, due to additional properties requiring heating
upgrades, and to maintain an ongoing programme of works.
• Fire Precaution Measures - £427,000 allocated to 2023/24, to cover
additional properties which were not included in the original programme
of works.
Page 57 of 136

Page 58

• Environmental Improvements - £500,000 allocated to 2023/24 to cover
additional works required due to Health & Safety requirements.
• Bathroom Modernisation Programme - £1,450,000 allocated to
2023/24, as a result of the continuing referrals from Occupational
Therapists. 
7.8 Due to the complexity of the redevelopment of the property in Balmoral Road,
Blairgowrie, the estimated costs have increased. Consequently, it is proposed
not to proceed with the project, and to transfer the budget of £264,000 to the
redevelopment of 149-151 Dunkeld Road, Perth. It is also proposed to
increase the budgets for Sheltered Housing (£20,000) and General Works
(£77,000) by transferring £97,000 from the ICT Expenditure budget in
2023/24. 
7.9 The remaining budget adjustments reflect timing differences on various
projects, with the main proposed movements detailed in the table below: 
Project 2023/24
£’000
2024/25
£’000
Later Years
£’000
Description
External Fabric (net of
Third party
Contributions)
894 (528) (366) Following conclusion of the
Tenement Management System,
additional properties have been
added to the current contract,
primarily roof and harling works
at Logie Crescent, Perth.
Kitchen Modernisation
Programme 
(1,400) 0 1,400 Increased lifespan of previous
kitchen upgrades has reduced
demand in the current
modernisation cycle. Budget
rephased to maintain a future
replacement programme
Energy Efficiency 279 (279) 0 Works have been completed
faster than anticipated,
consequently additional works
have been planned and the
budget rephased accordingly. 
7.10 Capital Financed by Current Revenue (CFCR) increased by £90,000 in
2022/23 which has reduced the borrowing requirement on the programme.
There are no further movements which impacts the borrowing requirement
over the remainder of the 5-year programme. 
8. BUDGET OVERVIEW 
8.1 The projected net expenditure outturn in 2023/24 for the Composite Capital
Budget is £180,346,000 and represents 101% of the 2023/24 budget as
approved on 26 April 2023 (£178,033,000). The revised budget is based on
the latest projection of expenditure and all budget adjustments outlined within
this report.
Page 58 of 136

Page 59

8.2 Net expenditure to 31 July 2023 on the Composite Capital Budget is
£40,660,000 and represents 23% of the proposed revised budget for 2023/24 of
£180,346,000. This level of expenditure is higher than normal at this early stage
of the financial year, and reflects several larger projects being on-site with
construction works now being undertaken. 
8.3 The projected net expenditure outturn in 2023/24 for the Housing Investment
Programme is £27,597,000 and represents 135% of the 2023/24 budget
approved on 26 April 2023 (£20,422,000). The increase reflects the level of
expenditure brought forward from last year as well as the allocation of some of
the SHQS Future Developments budget from later years to specific projects in
the current year. 
8.4 Net expenditure to 31 July 2021 on the Housing Investment Programme is
£5,015,000 which represents 18% of the proposed revised budget for 2023/24 of
£27,597,000. 
8.5 Overall, the estimated Council Borrowing Requirement in 2023/24 has increased
as a result of borrowing previously budgeted last year being carried-forward to
the current year. There is no movement in the level of borrowing arising from the
current monitoring exercise. While the projections have been based on a
comprehensive monitoring exercise, they continue to remain subject to
uncertainty as a result of ongoing inflationary pressures, particularly in the
construction industry, in the current economic environment. 
Author(s)
Name  Designation Contact Details
John Jennings Senior Accountant  CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date
Karen Donaldson 
Stewart MacKenzie
Chief Operating Officer 
Head of Finance 
1 September 2023 
1 September 2023 
Page 59 of 136

Page 60

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at a
corporate and service level and shape resources allocation.  They are as follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than those
reported within the body of the main report. 
Page 60 of 136

Page 61

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report other
than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate discrimination,
advance equality of opportunity, and foster good relations between equality
groups.  Carrying out Equality Impact Assessments for plans and policies allows
the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been assessed
as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its proposals. 
3.4 The information contained within this report has been considered under the Act. 
However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the Council
has to discharge its duties in a way which contributes to the achievement of
sustainable development. In terms of the Climate Change Act, the Council has a
general duty to demonstrate its commitment to sustainability and the community,
environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the Act. 
However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Chief Executive and the Executive Directors have been consulted in the
preparation of this report.   
Page 61 of 136

Page 62

2. BACKGROUND PAPERS 
No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above report. 
3. APPENDICES 
• Appendix I – Composite Capital Programme - Estimated Capital
Resources 2023/24 to 2027/28
• Appendix II – Composite Capital Programme - Summary of Capital
Resources and Expenditure 2023/24 to 2027/28        
• Appendix III – HRA Capital Investment Programme – Summary of Capital
Resources and Expenditure 2023/24 to 2027/28 
• Appendix IV – Significant Capital Projects Progress Update
Page 62 of 136

Page 63

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2023/24 to 2027/28
APPENDIX I
Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources
2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget
Capital Grants
Cycling, Walking & Safer Routes (CWSR) 1,112 200 200 200 200 1,912
Road Safety Improvement Fund 0 0 0 0 0 0
Town Centre Fund 0 0 0 0 0 0
Regeneration Fund 0 0 0 0 0 0
Recycling Improvement Fund 2,363 0 0 0 0 2,363
Cross Tay Link Road - Transport Scotland 15,000 0 0 0 0 15,000
Gypsy Travellers Sites Improvement Grant 0 0 0 0 0 0
General Capital Grant 22,500 13,847 12,639 12,150 12,150 73,286
Total Capital Grants 40,975 14,047 12,839 12,350 12,350 92,561
General Capital Receipts
General Fund - Capital Receipts 976 250 250 250 250 1,976
General Fund - Ring Fenced Receipts 404 377 377 927 1,072 3,157
Total General Capital Receipts 1,380 627 627 1,177 1,322 5,133
Commercial Property Receipts
Capital Receipts brought-forward 2,245 859 2,330 2,638 2,638 2,245
Commercial Property Capital Receipts 243 1,679 308 0 0 2,230
Capital Receipts carried-forward (859) (2,330) (2,638) (2,638) (2,638) (2,638)
Total Commercial Property Receipts Applied 1,629 208 0 0 0 1,837
Contributions
Tay Cities Deal 1,257 999 550 505 1,956 5,267
Third Party Contributions 1,702 658 0 2,000 3,000 7,360
Developer Contributions 2,847 2,300 2,367 2,600 2,600 12,714
Revenue Budget Contributions 30 124 125 125 0 404
Total Contributions 5,836 4,081 3,042 5,230 7,556 25,745
Capital Borrowing Requirement 152,394 178,017 94,027 47,185 26,251 497,874
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 202,214 196,980 110,535 65,942 47,479 623,150
5
Page 63 of 136

Page 64

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2023/24 to 2027/28
APPENDIX I
Movements in Resources from Approved Budget - 26 April 2023
Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget
2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000
Resources brought forward from 2022/23 7,814 0 0 0 0 7,814
Increase/(Decrease) in:
Capital Receipts - General Fund 0 0 0 0 0 0
Capital Receipts - Commercial Property (2) 0 0 0 0 (2)
Capital Receipts - Ring Fenced 28 0 0 0 0 28
Capital Grants:
Cycling, Walking & Safer Routes (CWSR) 30 0 0 0 0 30
Road Safety Improvement Fund 0 0 0 0 0 0
Regeneration Fund 0 0 0 0 0 0
Recycling Improvement Fund (208) 0 0 0 0 (208)
Town Centre Fund 0 0 0 0 0 0
Cross Tay Link Road - Transport Scotland 0 0 0 0 0 0
Gypsy Travellers Sites Improvement Grant (24) 0 0 0 0 (24)
General Capital Grant 353 0 0 0 0 353
Tay Cities Deal 0 0 0 0 0 0
Third Party Contributions 490 658 0 0 0 1,148
Revenue Contributions (72) 0 0 125 0 53
Developer Contributions 0 0 0 0 0 0
Resources b/f 88 (147) (355) (355) (355) (1,479)
Resources c/f to future years 59 355 355 355 355 1,834
Borrowing Requirement (5,071) 2,830 958 409 874 0
Total Increase/(Decrease) in Resources 3,485 3,696 958 534 874 9,547
Approved Resources 26 April 2023 198,729 193,284 109,577 65,408 46,605 613,603
Revised Resources 202,214 196,980 110,535 65,942 47,479 623,150
Page 64 of 136

Page 65

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actuals Projected Revised Revised Revised Revised Revised
Budget Carry Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 31-Jul-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES 61,868 968 (400) 62,436 13,079 62,436 64,304 42,053 15,304 6,823 190,920
COMMUNITIES 101,869 4,654 882 107,405 26,242 107,405 116,800 57,471 38,138 25,996 345,810
HEALTH AND SOCIAL CARE 2,121 (23) (795) 1,303 64 1,303 2,098 1,303 1,303 1,319 7,326
CORPORATE AND DEMOCRATIC SERVICES 12,175 1,287 (4,260) 9,202 1,275 9,202 11,420 8,456 7,440 7,113 43,631
TOTAL NET EXPENDITURE 178,033 6,886 (4,573) 180,346 40,660 180,346 194,622 109,283 62,185 41,251 587,687
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (22,147) 0 (353) (22,500) (7,457) (22,500) (13,847) (12,639) (12,150) (12,150) (73,286)
DEVELOPER CONTRIBUTIONS (2,100) (747) 0 (2,847) 0 (2,847) (2,300) (2,367) (2,600) (2,600) (12,714)
CAPITAL RECEIPTS (1,215) (6) 2 (1,219) 0 (1,219) (1,929) (558) (250) (250) (4,206)
ANNUAL BORROWING REQUIREMENT 152,571 6,133 (4,924) 153,780 33,203 153,780 176,546 93,719 47,185 26,251 497,481
CAPITAL RECEIPTS BROUGHT FORWARD (2,157) 0 (88) (2,245) (2,245) (2,245) (859) (2,330) (2,638) (2,638) (2,245)
CAPITAL RECEIPTS CARRIED FORWARD 1,006 (88) (59) 859 2,245 859 2,330 2,638 2,638 2,638 2,638
TOTAL NET BORROWING REQUIREMENT 151,420 6,045 (5,071) 152,394 33,203 152,394 178,017 94,027 47,185 26,251 497,874
5
Page 65 of 136

Page 66

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES
MIS - Procurement & Integration 57 0 0 0 0 0 0 0 0
MIS - SEEMIS Licensing 0 0 745 147 745 0 0 0 0 745
Blairgowrie Recreation Centre - Replacement 700 24 17,324 4,708 17,324 12,200 4,003 0 0 33,527
Schools Modernisation Programme
Investment in the Learning Estate 1,300 85 (3) 1,086 354 1,086 10,688 8,550 8,650 6,823 35,797
Free School Meal Expansion Programme 913 913 1,348 1,348 2,000 0 0 0 3,348
Methven Primary School Refurbishment 280 (17) 14 6 14 250 0 0 0 264
Breadalbane Academy, Aberfeldy - 3G Pitch 0 0 29 18 29 0 0 0 0 29
Third Party Contribution (The Scottish Football Association) 0 0 (29) (14) (29) 0 0 0 0 (29)
Kirkmichael Primary School Upgrades 91 (3) 28 32 32 0 0 0 0 32
Capital Receipt (ring-fenced) 0 0 (28) (128) (128) (128) 0 0 0 0 (128)
Early Learning & Childcare 38 1 (1) 0 0 0 0 0 0 0
- Letham Primary School Upgrade Project 19 (4) 4 0 0 0 0 0 0 0
- Oakbank Primary School Upgrade Project 0 12 12 12 0 0 0 0 12
- Rattray Primary School Upgrade Project 1,645 (15) 155 22 155 0 0 0 0 155
North/West Perth - New Primary School 39 (2) 1,059 1,059 7,500 15,000 400 0 23,959
Riverside Primary New School 11,228 (15) 3,410 1,635 3,410 0 0 0 0 3,410
Technology Upgrades 15 (22) (250) 128 128 1,016 250 0 0 1,394
Perth Academy - Refurbishment 1,665 (204) 1,311 539 1,311 2,500 2,150 2,150 0 8,111
Perth Grammar School - Upgrade Programme Phase 3 598 6 1,469 128 1,469 1,500 1,500 504 0 4,973
Perth High School - Internal Services & Refurbishment 9 4 16 3 16 0 0 0 0 16
Perth High School - New School Investment 5,836 (56) 30,244 4,053 30,244 26,500 10,600 3,600 0 70,944
Harris Academy/Invergowrie - Extension 1,100 261 (150) 4,211 1,608 4,211 150 0 0 0 4,361
TOTAL: EDUCATION AND CHILDREN'S SERVICES 25,533 968 (400) 62,436 13,079 62,436 64,304 42,053 15,304 6,823 190,920
COMMUNITIES
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..) 0 0 0 0 362 362 362 361 1,447
Additional Road Safety - Pedestrian Crossings 0 0 175 175 175 175 0 0 525
Schools Road Safety Measures 245 (13) 28 422 89 422 0 0 0 0 422
Scottish Government Grant - CWSS (106) 28 (28) 0 0 0 0 0 0 0
20mph Signage Programme - Schools 111 40 129 129 0 0 0 0 129
20mph Signage Programme 0 0 76 76 0 0 0 0 76
Cycling Walking & Safer Routes (CWSR) 987 128 152 1,262 116 1,262 200 200 200 200 2,062
Scottish Government Grant - CWSR (867) (128) (2) (1,112) (1,112) (200) (200) (200) (200) (1,912)
Third Party Contribution (TACTRAN) (120) 0 (150) (150) (150) 0 0 0 0 (150)
Car Parking Investment 45 15 (1) 291 291 0 0 0 0 291
Car Parking Investment - Pitlochry 0 0 150 150 0 0 0 0 150
Strathmore Cycle Network 0 0 0 0 0 84 0 0 84
Page 66 of 136

Page 67

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Sub-Total 295 70 (1) 1,243 205 1,243 537 621 362 361 3,124
Asset Management - Roads & Lighting
Structural Maintenance 13,770 376 394 12,086 4,985 12,086 9,498 9,498 9,706 7,500 48,288
Third Party Contribution (Forestry Commission Timber Routes) (1,316) (176) (109) (285) (13) (285) 0 0 0 0 (285)
Traffic Signal Renewals - Upgrading 105 (21) 73 73 0 0 0 0 73
Third Party Contributions (3) 0 0 0 0 0 0 0 0
Footways 524 3 100 538 203 538 410 410 410 410 2,178
Third Party Contributions 0 0 0 0 0 0 0 0 0
Investment in Local Footpaths 0 0 0 0 0 100 100 0 200
Road Safety Barriers 10 (1) 22 22 0 0 0 0 22
Sub-Total 13,090 181 385 12,434 5,175 12,434 9,908 10,008 10,216 7,910 50,476
Asset Management - Bridges
Bridge Refurbishment Programme 629 88 (3) 3,654 193 3,654 2,129 1,445 1,746 1,406 10,380
Dalhenzean Culvert 43 15 15 15 0 0 0 264 279
Dunkeld Golf Course 29 6 6 6 0 0 0 219 225
Vehicular Bridge Parapets Programme - Assess & Upgrade 0 0 0 1 0 29 0 0 0 29
Old Perth Bridge - Strengthening 10 10 190 190 10 2,369 0 0 2,569
Perth Queens Bridge - Strengthening 0 0 335 335 60 70 2,153 0 2,618
Garry Viaduct 0 0 110 110 300 300 1,900 1,790 4,400
Culteuchar Culvert 42 (4) 391 5 391 0 0 0 0 391
Glendevon Bridge 235 (2) 2 0 0 0 0 0 0 0
Tullyfergus Bridge 0 0 0 0 0 0 0 134 134
Sub-Total 988 113 (1) 4,701 199 4,701 2,528 4,184 5,799 3,813 21,025
Improvement Schemes
A9/A85 Road Junction Improvements 359 271 (1) 270 8 270 0 0 0 0 270
Cross Tay Link Road (CTLR) 37,309 2,661 72,842 18,963 72,842 26,213 0 0 0 99,055
Scottish Government Grant (20,000) 0 (15,000) (15,000) 0 0 0 0 (15,000)
A977 Upgrades 0 0 540 8 540 0 0 0 0 540
Brioch Road, Crieff - Road Realignment & Safety Measures 0 0 31 31 0 0 0 0 31
Sub-Total 17,668 2,932 (1) 58,683 18,979 58,683 26,213 0 0 0 84,896
Rural Flood Protection Schemes
Almondbank Flood Protection Scheme 93 17 17 5 17 0 0 0 0 17
Revenue Contribution (54) 0 0 0 0 0 0 0 0
Perth Flood Protection Scheme (Pump Replacement) 0 0 0 0 0 0 0 0 0
Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 35 3 354 5 354 0 0 0 0 354
Comrie Flood Protection Scheme 1,847 (10) 7,385 1 7,385 16,841 0 0 0 24,226
Milnathort Flood Protection Scheme 112 27 79 79 1,590 0 0 0 1,669
South Kinross Flood Protection Scheme 115 (15) 225 26 225 1,168 1,787 0 0 3,180
Scone Flood Protection Scheme 5 0 90 90 76 601 0 0 767
Coastal Change Adaptation 0 0 100 100 0 0 0 0 100
Page 67 of 136

Page 68

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Sub-Total 2,153 22 0 8,250 37 8,250 19,675 2,388 0 0 30,313
Perth & Kinross Place-making
Mill Street Environmental Improvements 0 0 127 127 0 0 0 0 127
Perth, Place, People 0 0 3,599 3,599 0 0 0 0 3,599
Perth City Centre Golden Route (Rail Station) 15 (5) 10 11 10 0 0 0 0 10
City Greening 0 0 31 31 0 0 0 0 31
Perth & Kinross Lighting Action Plan 875 (131) 2 1,071 228 1,071 677 0 0 0 1,748
Sub-Total 890 (136) 2 4,838 239 4,838 677 0 0 0 5,515
Other Planning Projects
Creative Exchange (former St. John's Primary School) 53 53 53 53 0 0 0 0 53
Town Centre - Regeneration & Economic Improvements 26 0 0 0 0 0 0 0 0
Scottish Government Grant (66) 0 0 0 0 0 0 0 0
TCF Revenue Contribution (23) 0 0 0 0 0 0 0 0
Local Full Fibre Network 158 22 22 22 0 0 0 0 22
Third Party Contribution - DCMS 0 0 0 0 0 0 0 0 0
Third Party Contribution - TCF 40 0 0 0 0 0 0 0 0
Third Party Contribution - Tay Cities Deal (198) 0 0 0 0 0 0 0 0
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 703 139 (1) 429 179 429 0 0 0 0 429
Third Party Contribution - ERDF (266) (52) (162) (162) 0 0 0 0 (162)
Third Party Contribution - Tay Cities Deal (436) (86) (267) (267) 0 0 0 0 (267)
Perth Eco-Innovation Park at Perth West 0 0 3,000 3,000 20,800 9,017 0 0 32,817
Third Party Contributions - Tay Cities Deal 0 0 (990) (990) (999) (550) (505) (1,956) (5,000)
Other Third Party Contributions 0 0 0 0 0 0 (2,000) (3,000) (5,000)
Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 0 0 (550) (725) (1,275)
Coupar Angus - Strathmore Community Hub 63 0 0 0 0 0 0 0 0
Nature Restoration 206 32 354 386 386 0 0 0 0 386
Third Party Contributions 0 0 0 0 0 0 0 0 0
Sub-Total 260 108 353 2,471 179 2,471 19,801 8,467 (3,055) (5,681) 22,003
City Centre Developments - Cultural Attractions
Perth Museum 10,943 301 2,368 2,368 0 0 0 0 2,368
Perth Art Gallery 112 68 3,272 16 3,272 0 0 0 0 3,272
Collections Centre 0 0 0 0 0 0 0 0 0
PH2O 0 0 0 0 30,000 25,000 20,000 15,000 90,000
Sub-Total 11,055 369 0 5,640 16 5,640 30,000 25,000 20,000 15,000 95,640
Community Planning
Letham Community Wellbeing Hub 2,552 254 1,571 628 1,571 0 0 0 0 1,571
Scottish Government Grant (Regeneration Fund) (524) 0 0 0 0 0 0 0 0
Third Party Contribution (Letham4All) 0 0 (519) (519) 0 0 0 0 (519)
Revenue Contribution (Place Based Development Grant) (735) 0 0 0 0 0 0 0 0
Sub-Total 1,293 254 0 1,052 628 1,052 0 0 0 0 1,052
Page 68 of 136

Page 69

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Page 69 of 136

Page 70

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Community Greenspace
Play Areas - Improvements Implementation Strategy 92 6 503 27 503 987 878 150 150 2,668
Third Party Contribution (47) (10) (10) (10) 0 0 0 0 (10)
Revenue Contribution (Developer Contribution Reserve) (2) 0 0 0 0 0 0 0 0
3G Pitch, Blairgowrie 38 20 20 20 100 0 0 0 120
Settlement/Neighbourhood Parks 25 (26) 27 1 1 0 0 0 0 1
Countryside Sites 23 (1) 1 0 0 139 0 0 0 139
Community Greenspace Sites 0 0 (30) (30) (30) 654 682 682 678 2,666
Community Greenspace Bridges 38 (1) 53 53 0 0 0 0 53
Core Path Implementation 48 9 9 3 9 0 0 0 0 9
Third Party Contribution (60) (21) (21) (21) 0 0 0 0 (21)
Alyth Environmental Improvements 0 0 0 0 0 0 0 0 0
Premier Parks 39 (6) 8 8 0 0 0 0 8
Auchterarder Public Park 324 32 1 33 18 33 0 0 0 0 33
Revenue Contribution 0 (3) (3) (3) 0 0 0 0 (3)
Third Party Contribution (201) 0 0 0 0 0 0 0 0
The Knock 9 0 0 0 0 0 0 0 0
Third Party Contribution 0 (3) (3) (3) 0 0 0 0 (3)
Kinnoull Hill 8 4 4 4 0 0 0 0 4
Cemetery Extensions 25 15 459 459 150 100 100 100 909
Sub-Total 359 15 (1) 1,023 48 1,023 2,030 1,660 932 928 6,573
Waste Strategy
Recycling Improvement Fund 358 208 (208) 2,363 26 2,363 0 0 0 0 2,363
Scottish Government Grant (358) (208) 208 (2,363) (2,363) 0 0 0 0 (2,363)
Sub-Total 0 0 0 0 26 0 0 0 0 0 0
Support Services
PC Replacement & IT Upgrades
Hardware 22 1 16 1 16 15 15 14 14 74
Licenses 198 64 152 65 152 112 95 71 71 501
Sub-Total 220 65 0 168 66 168 127 110 85 85 575
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units 18 17 57 57 0 0 0 0 57
Broxden Business Park - Additional Infrastructure 17 (10) 20 10 10 0 0 0 0 10
Western Edge, Kinross - Site Servicing 17 4 1 5 5 0 0 0 0 5
Additional Infrastructure Investment - Broxden 46 46 (46) 0 0 0 0 0 0 0
Broxden Drainage Mitigation Works 308 237 401 638 638 866 0 0 0 1,504
Third Party Contribution (Scottish Water) (239) (239) (231) (470) (470) (658) 0 0 0 (1,128)
Ruthvenfield Business Centre 301 18 1,372 1,372 0 0 0 0 1,372
Third Party Contribution (115) 0 0 0 0 0 0 0 0
North Muirton Drainage 47 17 17 17 0 0 0 0 17
North Muirton Industrial Estate Expansion Land - Servicing 0 0 0 0 0 0 0 0 0
Page 70 of 136

Page 71

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Sub-Total 400 90 145 1,629 0 1,629 208 0 0 0 1,837
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins 265 4 (1) 203 12 203 200 200 200 200 1,003
Wheeled Bin Replacement Programme - Commercial Bins 39 15 35 35 20 20 20 20 115
Recycling Containers, Oil Banks & Battery Banks Replacement Progra 54 28 150 150 65 65 65 65 410
Capital Receipts - Disposals (4) 0 0 0 0 0 0 0 0
Litter Bins 25 0 25 5 25 50 50 50 50 225
Smart Cities - Smart Waste 172 11 1 145 46 145 0 0 0 0 145
Third Party Contribution (ERDF) (67) (2) (53) (53) 0 0 0 0 (53)
Vehicle Replacement Programme 1,242 57 (1) 1,813 301 1,813 3,300 3,300 3,300 3,000 14,713
Capital Receipts - Vehicle Disposals (118) (4) (276) (22) (276) (377) (377) (377) (347) (1,754)
Crematorium - Abatement Works 9 (1) 1 0 0 0 0 0 0 0
Street Lighting Renewal - LED & Column Replacement 650 38 (1) 804 120 804 888 825 541 592 3,650
Smart Cities - Intelligent Street Lighting 0 (3) 3 0 0 0 0 0 0 0
LED Traffic Signal Replacement 146 4 4 4 4 0 0 0 0 4
Almondbank Flood Protection Scheme 4 4 (1) 3 3 0 0 0 0 3
Land Purchase & Development (Hotel Development) 0 0 0 0 950 950 0 0 1,900
Technology & Innovation Incubator Units 0 0 0 0 0 0 0 0 0
Sub Total 2,417 151 1 2,853 466 2,853 5,096 5,033 3,799 3,580 20,361
Housing Projects
Gypsy Travellers Site Improvement Works 207 195 195 195 0 0 0 0 195
Additional Gypsy Traveller Site Improvement Works 225 216 9 225 3 225 0 0 0 0 225
Scottish Government Grant 0 (24) 24 0 (24) 0 0 0 0 0 0
Gypsy Traveller Site Community Improvement Works 33 33 (33) 0 0 0 0 0 0 0
New Gypsy Traveller Site 0 0 2,000 2,000 0 0 0 0 2,000
Sub Total 465 420 0 2,420 (21) 2,420 0 0 0 0 2,420
TOTAL: COMMUNITIES 51,553 4,654 882 107,405 26,242 107,405 116,800 57,471 38,138 25,996 345,810
Health & Social Care
Occupational Therapy Equipment 250 0 250 250 250 250 250 250 1,250
Technology Enabled Telecare 450 (13) (537) 1,000 64 1,000 1,537 1,000 1,000 1,000 5,537
Moving & Handling Office Refurbishment 0 0 (29) 0 0 29 0 0 0 29
Software Licences 43 (10) 53 53 53 53 53 69 281
Developing Supported Tenancies 0 0 (229) 0 0 229 0 0 0 229
TOTAL: HEALTH & SOCIAL CARE 743 (23) (795) 1,303 64 1,303 2,098 1,303 1,303 1,319 7,326
Page 71 of 136

Page 72

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
CORPORATE AND DEMOCRATIC SERVICES
Property Services
DDA Adaptation & Alteration Works Programme 174 10 410 87 410 200 200 200 200 1,210
Property Compliance Works Programme 1,626 198 627 2 627 650 650 650 650 3,227
Capital Improvement Projects Programme 1,937 425 2,275 85 2,275 1,800 1,800 1,800 894 8,569
Pitlochry High School - Upgrade Programme 465 56 316 67 316 0 0 0 0 316
Community School of Auchterarder - Structural Improvements 736 0 0 0 0 0 0 0 0
CO2 Monitors for Schools Programme 81 0 0 0 0 0 0 0 0
Energy Efficiency Works - Various Properties 0 0 (72) 27 27 27 0 0 0 0 27
Revenue Contribution (Salix Reserve) 0 0 72 (27) (27) 0 0 0 0 (27)
Decarbonisation - Prudential Borrowing Programme (PB) 0 0 (1,300) 700 700 1,300 0 0 0 2,000
Energy Conservation & Carbon Reduction Programme (PB) 178 (2) 138 43 138 150 150 150 150 738
Information Systems & Technology
ICT Infrastructure Replacement and Upgrade Programme 2,055 104 (354) 2,416 730 2,416 4,207 4,079 3,017 2,903 16,622
Data & Analytics 415 167 (442) 600 97 600 839 738 761 784 3,722
Third Party Contribution (ERDF) 0 0 0 0 0 0 0 0 0
Supporting Digital 700 8 (564) 750 30 750 855 878 901 926 4,310
Software Licences (Revenues & Benefits) 52 0 50 50 51 51 51 51 254
School Audio-Visual (AV) Equipment Replacement Programme 1,300 272 (798) 100 9 100 173 35 35 555 898
Mosaic - Swift Social Work System Replacement 412 49 (802) 820 98 820 1,319 0 0 0 2,139
Revenue Contribution 0 0 0 0 (124) (125) (125) 0 (374)
Customer Service Blueprint 0 0 0 0 0 0 0 0 0
TOTAL: CORPORATE AND DEMOCRATIC SERVICES 10,131 1,287 (4,260) 9,202 1,275 9,202 11,420 8,456 7,440 7,113 43,631
TOTAL COMPOSITE NET EXPENDITURE 87,960 6,886 (4,573) 180,346 40,660 180,346 194,622 109,283 62,185 41,251 587,687
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
CAPITAL RECEIPTS
General Capital Grant - Scottish Government (14,739) 0 (353) (22,500) (7,457) (22,500) (13,847) (12,639) (12,150) (12,150) (73,286)
Developer Contributions (1,549) (747) (2,847) (2,847) (2,300) (2,367) (2,600) (2,600) (12,714)
General Fund - Capital Receipts/Disposal (8) (4) 0 (976) 0 (976) (250) (250) (250) (250) (1,976)
Commercial Property - Capital Receipts/Disposal (1) (2) 2 (243) 0 (243) (1,679) (308) 0 0 (2,230)
Total: Capital Receipts (16,297) (753) (351) (26,566) (7,457) (26,566) (18,076) (15,564) (15,000) (15,000) (90,206)
Annual Composite Borrowing Requirement 71,663 6,133 (4,924) 153,780 33,203 153,780 176,546 93,719 47,185 26,251 497,481
CAPITAL RECEIPTS BROUGHT FORWARD (2,556) 0 (88) (2,245) (2,245) (2,245) (859) (2,330) (2,638) (2,638) (2,245)
CAPITAL RECEIPTS CARRIED FORWARD 2,157 (88) (59) 859 2,245 859 2,330 2,638 2,638 2,638 2,638
TOTAL NET COMPOSITE BORROWING REQUIREMENT 71,264 6,045 (5,071) 152,394 33,203 152,394 178,017 94,027 47,185 26,251 497,874
Page 72 of 136

Page 73

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
EDUCATION AND CHILDREN'S SERVICES
Project Project Description
MIS - Procurement & Integration Schools Management Information System
MIS - SEEMIS Licensing Licencing of Schools Management Information System
Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie
Investment in the Learning Estate Investment to upgrade the infrastructure and
environment of our existing school estate
Free School Meal Expansion Programme Upgrading kitchen and dining facilities to provide the
enhanced Free School Meals programme
Methven Primary School Refurbishment Upgrade of Methven Primary School facilities
Breadalbane Academy, Aberfeldy - 3G Pitch Additional investment required to upgrade 2G to 3G
Kirkmichael Primary School Upgrades Upgrade of Kirkmichael Primary School facilities
Early Learning & Childcare
- Letham Primary School Upgrade Project 1140 hrs project plus upgrade of primary school
infrastructure - Completed
- Oakbank Primary School Upgrade Project 1140 hrs project - Completed
- Rattray Primary School Upgrade Project 1140 hrs project plus upgrade of primary school
infrastructure - Completed
North/West Perth - New Primary School New primary school located at Bertha Park
Riverside Primary New School Replacement of North Muirton and Balhousie primary
schools
Technology Upgrades Upgrade to practical teaching environment within the
existing school estate
Perth Academy - Refurbishment Investment to upgrade the infrastructure and
environment of the Perth Academy including structural
work to sports block, lighting upgrades, classroom
upgrades and science block cladding
Perth Grammar School - Upgrade Programme
Phase 3
Investment to upgrade the infrastructure and
environment of the Perth Grammar School including
structural work to assembly hall, AV and WiFi upgrades,
classroom refurbishment and door upgrades
Perth High School - Internal Services &
Refurbishment
Necessary works to the infrastructure and environment of
the current Perth High School
Perth High School - New School Investment Replacement of the existing Perth High School
Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris
Academy in Dundee for continuation of access for pupils
based in Invergowrie
COMMUNITIES
Project Project Description
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety
Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing
facilities
Road Safety Improvement Fund works Provision of safety barriers on routes where motor
cycling is common
Schools Road Safety Measures A programme of works to improve road safety in the
vicinity of schools
20mph Signage Programme - Schools A programme of works to improve road safety in the
vicinity of schools
20mph Signage Programme A programme of works to introduce 20mph speed limits.
Cycling Walking & Safer Routes (CWSR) A programme of works providing infrastructure for
cycling, walking and safer routes
Car Parking Investment Construction of new car park in Auchterarder
Car Parking Investment - Pitlochry Purchase of land and construction of a public car park
Strathmore Cycle Network Contribution towards a shared use path between Coupar
Angus and Blairgowrie
Structural Maintenance
Road maintenance to extend the life of roads, including
predominately road resurfacing, surface dressings,
installing new drainage infrastructure and repairs to and
replacement of defective embankments and retaining
walls
Asset Management - Roads & Lighting
Page 73 of 136

Page 74

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
Project Project Description
Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal
infrastructure
Footways Replacement of existing  deteriorated footway surfaces
Investment in Local Footpaths A programme of works to improve and provide local
footpaths
Road Safety Barriers
Renewal of existing barriers where unrecoverable
damage has occurred and renewal of barriers where
timber posts have been used in construction
Page 74 of 136

Page 75

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
Project Project Description
Bridge Refurbishment Programme
Used to appoint specialist external inspection teams and
consultants to carry out specialist access bridge
inspections and assessments
Dalhenzean Culvert Culvert replacement project (later years)
Dunkeld Golf Course Culvert replacement project (later years)
Vehicular Bridge Parapets Programme - Assess &
Upgrade
Assessment and Upgrading of Vehicle Parapets
Programme
Old Perth Bridge - Strengthening
Carry out works recommended by the 2018 Bridge
Assessment study, including a range of assessment,
investigation, strengthening and improvement works
Perth Queens Bridge - Strengthening
Carry out works recommended by the 2018 Bridge
Assessment study, including a range of assessment,
investigation, strengthening and improvement works
Garry Viaduct
Replacement of Bearings and Parapets; including
strengthening of deck for bearing replacement jacking
up, and to cater for increased parapet vehicular deterrent
capacity
Culteuchar Culvert Replace existing temporary steel bridge (on hire) with
culvert
Glendevon Bridge Major bridge repair works required due to severe river
scour damage (now complete)
Tullyfergus Bridge Installation of scour protection to protect existing bridge
abutments (later years)
A9/A85 Road Junction Improvements
New infrastructure including a new A9 overbridge, a
bridge over the River Almond and road linking the A85 to
Inveralmond and Bertha Park (Phase 1 of Perth
Transport Futures Project) - complete
Cross Tay Link Road (CTLR)
New road and major structure over the River Tay, linking
the A9 north of Inveralmond and the A94 north of Scone
(Phase 2 of Perth Transport Futures Project).
A977 Upgrades A programme of works to improve road safety along the
A977.
Broich Road, Crieff - Road Realignment & Safety
Measures Complete
Almondbank Flood Protection Scheme Substantially complete
Perth Flood Protection Scheme (Pump
Replacement) Complete
Perth Flood Protection Scheme (South Inch Culvert
Reinstatement)
Ground investigation and monitoring then design project
to refurbish existing culvert
Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk
of flooding in Comrie
Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk
of flooding in Milnathort
South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk
of flooding in South Kinross
Scone Flood Protection Scheme Design and construction of a scheme to reduce the risk
of flooding in Scone
Coastal Change Adaptation Design and construct projects to deal with incidents of
coastal erosion
Mill Street Environmental Improvements
Potential compensation payments associated with claims
against compulsory land acquisition to enable delivery of
environmental improvements to stimulate and support
development and investment
Perth, Place, People
Design and development of sustainable transport
corridors to improve access to and from Perth and
enable additional development and improvement within
Perth city centre
Perth City Centre Golden Route (Rail Station)
Design and development of improvements to access,
signage and animation from rail and bus station to Perth
city centre to complement improvements to integration of
transport
Asset Management - Bridges
Improvement Schemes
Rural Flood Protection Schemes
Perth & Kinross Place-making
Page 75 of 136

Page 76

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
Project Project Description
City Greening
Improvements to support enhancement of retail trading
environment and residential areas and enhanced use of
space for markets, events and alfresco use
Page 76 of 136

Page 77

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
Project Project Description
Perth & Kinross Lighting Action Plan
Architectural and creative lighting to enhance city and
towns appearance, reduce energy cost and increase
safety at nighttime to increase dwell time, support the
hospitality sector, events and grow the evening economy
Creative Exchange (former St. John's Primary
School)
Repurposing old school to offer space to creative
industry businesses and create the Famous Grouse Idea
Centre, a space to support business innovation. 
Complete
Town Centre - Regeneration & Economic
Improvements Complete
Local Full Fibre Network
Provision of gigabit fibre connectivity to Council's
buildings to unlock gigabit connectivity for surrounding
communities. Completed
Low Carbon Transport & Active Travel Hub -
Broxden EV Chargers
Provision of fast EV chargers combined with solar power
generation and battery storage at Broxden Park & Ride -
Near completion
Perth Eco-Innovation Park at Perth West
Provision of enabling infrastructure (access road, A9
underpass and unit platforms) to develop 25ha of
employment land supporting clean growth, business
innovation and jobs - Phase 1 (11ha) - In development
Coupar Angus - Strathmore Community Hub Complete
Nature Restoration
Protection and restoration of biodiversity focusing on
over-exploitation of the natural environment and
addressing its consequences; habitat loss and
fragmentation; and invasive non-native species - 22/23
completed - 23/24 started
Perth Museum
Refurbishment of Perth City Hall to create new museum
spaces and cafe. Main construction phase complete and
install/fit out on schedule for planned opening spring
2024
Perth Art Gallery Refurbishment of temporary galleries - scheduled for
completion November 2023
Collections Centre Project removed from programme
PH2O
Replacement of Perth Leisure Pool and Dewars Ice Rink.
On hold pending outcome of Leisure and Culture Assets
Review
Letham Community Wellbeing Hub
Refurbishment of Letham Wellbeing Hub to offer a range
of services to the local community managed by
Letham4All - scheduled for completion end 2023
Play Areas - Improvements Implementation Strategy
Regular refurbishment of 146 play areas based on
approx. 6-8 per year.  Involves community engagement
and often co-funding and design of the sites
3G Pitch, Blairgowrie Two phase community led project to provide a new full
sized 3G football pitch and pavilion
Settlement/Neighbourhood Parks
Refurbishment of neighbourhood parks working in
partnership with communities to improve, update and
renew worn out or obsolete infrastructure
Countryside Sites Refurbishment of more natural parks and open spaces
Community Greenspace Sites
Main fund for all Community Greenspace Sites which is
drawn down to support the overall capital programme of
refurbishments and upgrades
Community Greenspace Bridges Refurbishment programme for all bridges on Community
Greenspace sites
Core Path Implementation Holding budget for Crieff Comrie Core path development
mainly funded through Sustrans
Alyth Environmental Improvements Town centre upgrade including community led
refurbishment of the burnside - complete
Premier Parks Small budget to facilitate refurbishment of former
Premier Park upgrades
Other Planning Projects
City Centre Developments - Cultural Attractions
Community Planning
Community Greenspace
Page 77 of 136

Page 78

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
Project Project Description
Auchterarder Public Park Major play area upgrade co-funded and designed with
the community
The Knock Complete
Kinnoull Hill Complete
Cemetery Extensions
Funding to allow the extension of existing or
development of new cemeteries to address the pressure
for burial space
Page 78 of 136

Page 79

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
Project Project Description
Recycling Improvement Fund
External Scottish Government funding (Recycling
Improvement Fund) to roll out 4th bin to householders for
recycling
Hardware Funding of additional or bespoke IT Hardware for
Communities Staff
Licenses Funding of software contracts
North Muirton Industrial Estate - Site Servicing &
Provision of Units Only road adoption works remaining
Broxden Business Park - Additional Infrastructure Only road adoption works remaining
Western Edge, Kinross - Site Servicing Only road adoption works remaining
Additional Infrastructure Investment - Broxden Complete
Broxden Drainage Mitigation Works Drainage/pumping station works underway and subject
to agreement/contribution from Scottish Water
Ruthvenfield Business Centre Works on redevelopment in progress
North Muirton Drainage Drainage/pumping station underway
North Muirton Industrial Estate Expansion Land -
Servicing Complete
Wheeled Bin Replacement Programme - Domestic
Bins
Replacement of damaged and end of life wheeled bins
for households. Also suppling bins for new properties
Wheeled Bin Replacement Programme -
Commercial Bins
Replacement of damaged and end of life wheeled bins
for commercial customers. Also suppling bins for new
customers and changes to collection contracts
Recycling Containers, Oil Banks & Battery Banks
Replacement Programme
Replacement of damaged and end of life oil and battery
banks
Litter Bins Replacement of damaged and end of life litter bins
and/or for general supply of litter bins where required.
Smart Cities - Smart Waste
Programme now complete - included introduction of In
Cab system for refuse vehicles, fill level sensors on city
centre litter bins
Vehicle Replacement Programme Fleet vehicle replacement programme
Crematorium - Abatement Works Complete
Street Lighting Renewal - LED & Column
Replacement
Street Lighting LED conversion and column replacement
programme
Smart Cities - Intelligent Street Lighting Complete
LED Traffic Signal Replacement Complete
Almondbank Flood Protection Scheme Under Rural Flood
Land Purchase & Development (Hotel Development)
Development agreement secured and release of grant
for heritage subject to progression through planning and
cost evidence
Technology & Innovation Incubator Units Complete
Gypsy Travellers Site Improvement Works Programme of works for improvements on Gypsy
Traveller sites at Bobbin Mill and Double Dykes
Additional Gypsy Traveller Site Improvement Works Additional funding to support improvements works
programme on Gypsy Traveller sites
Gypsy Traveller Site Community Improvement
Works Funding from Gypsy Traveller Scottish Government
Funding Bid for replacement of chalets at Double Dykes
New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site
CORPORATE AND DEMOCRATIC SERVICES
Project Project Description
DDA Adaptation & Alteration Works Programme
To provide unhindered accessibility to all Council
Buildings - e.g. Ramps/Lifts/Door Access/Accessible
Toilets and Changing Areas
Prudential Borrowing Projects
Housing Projects
Property Services
Waste Strategy
Support Services - PC Replacement & IT Upgrades
Commercial Property Investment Programme
Page 79 of 136

Page 80

PERTH AND KINROSS COUNCIL
DESCRIPTIONS OF CAPITAL PROJECTS
APPENDIX II
Project Project Description
Property Compliance Works Programme
To ensure compliance with current and changing
legislation including - New Fire Alarms; Lighting; Wiring;
Fire Protection Works; Gas pipework within buildings
and Roof Restraint safety systems
Capital Improvement Projects Programme
Roof Upgrades; Full internal refurbishment works; New
Heating Systems; Boilers and pipework; Structural
Upgrades; Small extensions; New Windows/Doors; New
Fencing; New Cladding
Pitlochry High School - Upgrade Programme
Upgrades to Mechanical and Electrical Infrastructure,
including rewiring, heating and controls systems,
replacement lighting and consequential building works
such as new ceilings, painting and flooring
Community School of Auchterarder - Structural
Improvements
Undertake Structural improvement works following
recommendations of Edinburgh schools report
CO2 Monitors for Schools Programme
Installation of CO2 monitors throughout the Property
estate to monitor air quality and improve ventilation
systems where necessary
Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to
reduce energy cost across the property estate
Decarbonisation - Prudential Borrowing Programme
(PB)
This budget will support PKCs path to NetZero and focus
primarily on the de-carbonisation of heat and replacing
inefficient direct emissions heat sources
Energy Conservation & Carbon Reduction
Programme (PB)
This budget is focused on works to reduce PKC energy
consumption and help achieve annual KPI energy
reduction of 3%
ICT Infrastructure & Replacement and Upgrade
Programme
This Programme delivers the IT / digital environment,
digital resources and systems required by staff and
young people. The programme maintains, supports and
develops computers; networks; telephony; Microsoft
systems; connectivity and equipment; datacentres;
servers; file storage and back up; security systems and
video conferencing
Data & Analytics
Delivers the governance, tools, technologies and
organisation-wide skills required for optimising value
from Council data, driving informed decision making
around resources, priorities and service delivery targets
Supporting Digital
Develops the capabilities we need to be an innovative
digital organisation.  Including developing the Council’s
corporate employee (mobile working) and customer
(online services) platforms, to create new digital products
and services; investment in tools such as Microsoft;
resourcing innovation and building digital skills, insight
and expertise
Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits
team
School Audio-Visual (AV) Equipment Replacement
Programme
Ensures all Perth and Kinross classrooms have
equitable access to audio visual panels and the digital
skills to exploit these resources for learning and teaching
Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work
system to replace SWIFT
Information Systems & Technology
Page 80 of 136

Page 81

APPENDIX III
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 31-Jul-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 (£'000) £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House New Build Programme
Glebe, Scone - 65 Units 0 17 17 17 0 0 0 0 17   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0
0 17 0 17 0 17 0 0 0 0 17
Milne Street, Perth - 8 Units 0 2 (2) 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0   
Third Party Contribution (Commuted Sums) 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0
0 2 (2) 0 0 0 0 0 0 0 0
Huntingtower, Perth - 70 Units 0 (5) 6 1 1 0 0 0 0 1   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0
0 (5) 6 1 0 1 0 0 0 0 1
Fairfield, Perth 0 252 (1) 251 129 251 0 0 0 0 251   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 (1) 1 0 0 0 0 0 0 0
0 251 0 251 129 251 0 0 0 0 251
Lynedoch Road, Methven 821 (123) 698 345 698 0 0 0 0 698   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0
821 (123) 0 698 345 698 0 0 0 0 698
Newburgh Road, Abernethy 0 (53) 53 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 21 (21) 0 0 0 0 0 0 0   
Capital Receipts 0 32 (32) 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
Future Developments 4,894 3,751 (4) 8,641 8,641 5,128 6,014 6,014 6,014 31,811   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0
4,894 3,751 (4) 8,641 0 8,641 5,128 6,014 6,014 6,014 31,811
Total Council House New Build 5,715 3,893 0 9,608 474 9,608 5,128 6,014 6,014 6,014 32,778
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2026/27
PERTH AND KINROSS COUNCIL
5
Page 81 of 136

Page 82

APPENDIX III
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 31-Jul-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 (£'000) £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Increase in Council House Stock
Council House Buy-Backs 3,438 (474) 2,964 1,408 2,964 3,000 3,000 3,000 3,000 14,964
Scottish Government Subsidy (1,050) 0 (1,050) (1,050) 0 0 0 0 (1,050)
2,388 (474) 0 1,914 1,408 1,914 3,000 3,000 3,000 3,000 13,914
Lock-ups and Garage Sites 0 0 0 0 50 0 0 0 50
Standard Delivery Plan
Heating Upgrade Contract Works 142 (66) 671 747 747 700 700 0 0 2,147 
- less Third Party Contribution 0 (29) 29 0 0 0 0 0 0 0
Rewiring, Infrastructure & Property Refurbishment 1,000 515 1,515 65 1,515 1,686 0 0 0 3,201
Triple Glazing 2,500 (34) 2,466 1,486 2,466 0 0 0 0 2,466
Controlled Door Entry 0 (12) 12 0 0 28 0 0 0 28 
- less Third Party Contribution 0 10 (10) 0 0 0 0 0 0 0
Kitchen Modernisation Programme 1,782 (8) (1,400) 374 73 374 1,504 2,025 0 0 3,903
Bathroom Modernisation Programme 0 (14) 1,450 1,436 411 1,436 0 0 0 0 1,436
External Fabric 198 (269) 1,029 958 554 958 0 259 0 0 1,217 
- less Third Party Contribution 0 135 (135) 0 0 0 0 0 0 0
Energy Efficiency 0 (172) 279 107 107 107 596 625 0 0 1,328
Multi Storey Flats 2,000 243 2,243 23 2,243 0 0 0 0 2,243
Environmental Improvements 333 66 500 899 283 899 0 0 0 0 899 
- less Third Party Contribution 0 1 (1) 0 0 0 0 0 0 0
Fire Precaution Measures 0 (28) 427 399 399 0 0 0 0 399 
- less Third Party Contribution 0 1 (1) 0 0 0 0 0 0 0
Sound Insulation 162 127 289 289 100 42 0 0 431
Structural 458 20 478 478 250 522 0 0 1,250
SHQS Future Developments 0 0 0 0 0 4,066 10,030 5,553 19,649
Total Standard Delivery Plan 8,575 486 2,850 11,911 3,002 11,911 4,864 8,239 10,030 5,553 40,597
Page 82 of 136

Page 83

APPENDIX III
Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
26-Apr-23 Forward Adjustment 31-Jul-23
from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 (£'000) £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 0 4 4 4 100 0 0 0 104
Balmoral Road, Rattray, Refurbishment (3 Units) 0 264 (264) 0 0 0 0 0 0 0
Anchor House, Rannoch Road, Perth - Conversion (5 Units) 100 (13) 87 1 87 0 0 0 0 87
149-151 Dunkeld Road, Perth 0 13 264 277 103 277 0 0 0 0 277 
- Government Grant 0 0 0 0 0 0 0 0 0
111 Rannoch Road, Perth (Former Driving Test Centre) 0 8 8 8 0 0 0 0 8
St.Catherine's Square Redevelopment 2,991 0 2,991 2,991 402 0 0 0 3,393
Shops & Offices 236 3 239 239 50 0 0 0 289
Greyfriars and Satellite Sites 0 34 34 2 34 50 0 0 0 84
Sheltered Housing 0 (9) 20 11 2 11 0 0 0 0 11
Double Dykes Chalet Replacement 0 (1) 1 0 5 0 0 0 0 0 0 
- Scottish Government Grant 0 0 0 0 0 0 0 0 0
General Capital Works 0 (7) 77 70 18 70 0 0 0 0 70
Upgrade and Replacements to Lifts Programme 139 (2) 137 137 0 0 0 0 137
ICT Expenditure 228 0 (97) 131 131 50 0 0 0 181
Mortgage to Rent 50 125 175 175 50 0 0 0 225
Total Other Investment in Council House Stock 3,744 419 1 4,164 131 4,164 702 0 0 0 4,866
Total Net Expenditure 20,422 4,324 2,851 27,597 5,015 27,597 13,744 17,253 19,044 14,567 92,205
Income
CAPITAL RECEIPTS 0 (1) 1 0 0 0 0 0 0 0
CFCR (2,055) 90 (90) (2,055) (2,055) (1,918) (2,248) (2,520) (2,752) (11,493)
TOTAL BORROWING REQUIREMENT 18,367 4,413 2,762 25,542 5,015 25,542 11,826 15,005 16,524 11,815 80,712
Page 83 of 136

Page 84

Page 84 of 136

Page 85

SIGNIFICANT CAPITAL PROJECTS
PROGRESS UPDATE
APPENDIX IV
Project Title Total Gross
Budget
(£'000)
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On Site Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement
36,000 0 36,000 36,000 Easter 2025 - new
centre currently
scheduled to open late
2024
Yes Yes On track Yes - on-site. Works are progressing well on-site.
North/West Perth New
Primary School*
24,000 0 24,000 24,000 Summer 2026 No No On track Yes. New Project Request submitted to HubCo in February
2023. Design team selected and early design process
has began.
Riverside Primary New
School
19,899 0 19,899 19,899 Early summer 2023 Yes Yes Phase 2 On Track Yes - School
operational.
Phase 1 is now complete and school is occupied, phase
2 is on-site being demolition works and new external
spaces.
Perth High School - New
School Investment
80,200 0 80,200 80,200 Summer 2026 - school
building curently
scheduled to open
summer 2025
Yes Yes On track Yes - on-site. FC concluded and construction works have now
commenced.
Harris
Academy/Invergowrie
Extension
5,200 0 5,200 5,200 Late 2023 Yes Yes On track Yes. Main extension complete, reconfiguration works still to
be undertaken.
Cross Tay Link Road
(CTLR) 150,500 40,000 110,500 110,500 Spring 2025 Yes Yes On programme No
Works progressing well and on programme. No
significant movements in projected spend.  Once piling
works complete at River Tay structure, the constrution of
the bridge deck works will commence - Autumn 2023.
Monthly risk meetings taking place with T&T and once
bridge deck works ongoing detailed analysis of
contingency and compensation events will be
undertaken.
Comrie Flood Protection
Scheme
28,435 0 28,435 28,435 Spring 2025 No No Advance works
complete; Main works
at tender assessment.
Yes Detailed design completed April 2023 and tender for
main works issued. Preliminary advance works
completed in July 2023.  Main works tender received in
June 2023 but cost higher than anticipated; tender
assessment is currently on-going (including independent
tender estimate, tender clarification and value
engineering). This has delayed the commencement of
the main construction works; once started the works will
have a duration of 18 months.
Perth Eco Innovation Park* 32,817 11,275 21,542 21,542
Not currently
programmed No No
Preliminary design
works completed Yes
Following the application for Levelling Up Fund Grant
funding of £10m being unsuccessful, the Council
approved a net increased of £10m on 1 March 2023
however the balance of £20m remains unfunded. Further
contributions and receipts are anticipated in years
beyond the current programme to 2027/28.
Perth Museum 27,232 10,300 16,932 16,932 Spring 2024 Yes Yes On track No
Construction phase complete and building handover to
CPK completed 8 August. Exhibition fit out underway.
PH2O 90,000 0 90,000 90,000
Not currently
programmed No No
Outline Business Case
reported to Council  23
February 2023, and
project on hold
pending review. Yes
Council approved to put the project on hold due to
affordability and pending the outcome of a wider review
in to leisure and cultural assets and how best to target
the required investment in arts and leisure for the benefit
of the wider community.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 5-year programme.
5
Page 85 of 136

Page 86

Page 86 of 136

Page 87

PERTH AND KINROSS COUNCIL 
Finance & Resources Committee
13 September 2023 
TREASURY ACTIVITY AND COMPLIANCE REPORT
2023/24 QUARTER 1 
Report by Head of Finance
(Report No. 23/244) 
1. PURPOSE 
1.1 The purpose of this report is to update the Committee on Treasury Activity for
the quarter ending 30 June 2023 and to report on compliance with the
Council’s Treasury Management Policy Statement (TMPS); Investment
Strategy and Prudential Indicators. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) note the content of this report. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Economic Background
• Section 5: Treasury Activity
• Section 6: Compliance
• Section 7: Investment Strategy Compliance and Performance
• Section 8: Prudential Indicators
• Section 9: Conclusion 
4. ECONOMIC BACKGROUND 
4.1 The Bank of England’s Monetary Policy Committee (MPC) increased the UK
Bank Base Rate from 4.25% to 4.50% at its meeting on 11 May 2023 and to
5% on 22 June and 5.25% on 3 August 2023. These increases were in
response to CPI inflation remaining significantly higher than the Bank’s target
rate of 2%. However, whilst UK inflation remained unchanged at 8.7% in May,
it fell more than expected to 7.9% in June, and then reduced further to 6.8% in
July mainly due to lower fuel prices. UK retail sales for June rose by 0.7%,
which was higher than forecast. UK unemployment rose to 4% in the period
March to May 2023, whilst wages rose 6.9% from a year ago. 
4.2 UK Gross Domestic Product (GDP) showed little growth in the 3 months to
March 2023, rising by 0.1%, with initial indications that growth in the next
quarter was around the same level. 
6
Page 87 of 136

Page 88

4.3 Internationally, the Eurozone experienced no GDP growth in the quarter to 31
March 2023. CPI Inflation reduced due to falling energy prices, whilst interest
rates were increased by 0.25% in June. In the US, GDP and inflation both fell.
The US interest rate was increased to the range of 5.00% to 5.25% in May
2023, with a further increase to between 5.25% and 5.50% in July 2023. 
4.4 The Public Works Loan Board’s (PWLB) certainty fixed interest rates for the
quarter, which are based on yields on UK gilts, are shown in the graph at
Appendix I. PWLB borrowing rates showed continuing volatility and increased
over the quarter, particularly in respect of the shorter borrowing periods. This
was due to the impact of base rate increases (including anticipated future
increases), continued inflationary pressures, and economic growth prospects
in the UK relative to other major economies. Over the 3-month period, all
rates were higher by the end of the quarter. 
4.5 When the Council last undertook significant new borrowing from the PWLB in
2019/20 and 2020/21, £260 million was borrowed at an average interest rate
of 1.67% over a period of 47.8 years. Borrowing £260 million from the PWLB
over the same duration would now incur an interest rate of approximately
5.06%, equivalent to an annual increase in interest charges of £8.8 million. A
similar comparison of the Council’s borrowing over the last 10 years at 2.16%
also highlights that borrowing at the current time incurs costs that are over
double historic costs. 
4.6 The Council has a requirement to undertake new borrowing of approximately
£510 million to finance the approved Capital budget over the period 2023/24
to 2027/28. The expectation is that PWLB rates on long term borrowing will
potentially not fall below 4% until mid-2025. As previously reported, this
marked increase in the cost of borrowing will be a significant factor when
members determine the Council’s strategic investment priorities in setting an
affordable Capital budget in February / March of next year. 
5.  TREASURY ACTIVITY 
5.1 A summary of the Council’s treasury position and transactions is shown at
Appendix II. The main activities are detailed below. 
5.2 During the quarter there was no new long-term PWLB borrowing undertaken,
however, a 9-year PWLB fixed-rate loan for £5 million at 3.30% matured and
was repaid in the quarter. Therefore, over the quarter the Council’s total long-
term debt reduced from £603.3 million to £598.3 million. The average interest
rate on long-term debt was 2.55% at the end of the quarter. There were 2
short-term market loans undertaken to manage cashflow , the first for £5
million for 28 days at 4.14% and the second for £4 million for 16 days at
4.12%. Both of these loans were repaid in the quarter. 
5.3 Common Good and Charitable Fund balances held on fixed deposit with the
Loans Fund remained the same at £2.294 million, with the average interest
rate paid increasing from 3.93% to 3.95%. Funds held from associated bodies
and organisations increased from £3.117 million to £4.299 million over the
quarter, in line with their own cash flow requirements, whilst the average rate
paid on these funds increased from 3.63% to 4.46% in line with increases in
the Bank Base Rate. 
Page 88 of 136

Page 89

5.4 Short term cashflow surpluses are invested in a mixture of fixed term
deposits, instant access accounts and money market funds. All investments
were made in accordance with the approved Investment Strategy and
Permitted Investments. 
Fixed Term Deposits 
5.5 Cashflow surpluses which arise during the year, and which are not
immediately required, are generally invested in fixed term deposits for periods
of up to 12 months, or up to 3 years where forecast cashflow requirements
allow. 
5.6 There were 9 fixed rate deposits made in the quarter (totalling £53 million) at
an average amount of £4.78 million and an average interest rate of 5.58% for
an average term of 280 days. Therefore, fixed deposit activity in the current
quarter decreased from the previous quarter to 31 March 2023 (£92 million)
mainly due to increased expenditure on the Capital programme and cash
requirements at the start of the new financial year. The deposits were spread
between different banking sectors and other local authorities, and for varying
durations. As interest rates increased over the quarter, the average rate on
investments also improved. Fixed deposits undertaken in the quarter will
generate £1,899,717 in interest at their maturity. 
Investments for Daily Cashflow Requirements  
5.7 Cashflow surpluses which are required for more immediate needs are
invested in the Council’s instant access and money market funds. These
investment transactions in the quarter can be summarised as follows: 
• The daily average amount of such funds increased from £4.4 million in
the last quarter to £6.1 million in the current quarter. 
• The average interest rate achieved on these accounts over the quarter
increased from 3.64% to 4.31% reflecting the increase in the base rate.
• Money Market Funds, which operate on instant access terms, were
used extensively over the quarter. The average amount invested
increased from £6.5 million in the previous quarter to £8 million in the
current quarter, whilst the average interest rate increased from 3.72%
to 4.32%.
• The increase in activity on these accounts reflected the need to keep
more funds for more immediate cashflow purposes over the quarter.
• Interest generated on these investments over the quarter amounted to
£144,782. 
5.8 The total amount of investments outstanding at 30 June 2023 was £154.050
million compared to £173.650 million at the end of the previous quarter. The
overall average rate of interest on the investments outstanding increased from
3.76% at the end of the previous quarter to 4.50% at the end of the current
quarter. This reflects increases in the Bank Base Rate over the quarter. 
Page 89 of 136

Page 90

5.9 Income generated on investments undertaken during the quarter will total
£2,044,499 on maturity. This measure reflects the total return on the
investment activity undertaken in each quarter and is lower in comparison to
the last quarter as fewer fixed term investments were undertaken. However,
investments in the current quarter were undertaken at higher interest rates. 
5.10 All of the above investment activities are consistent with the Council’s current
investment strategy and cashflow requirements. 
6. COMPLIANCE  
6.1 For the quarter ending 30 June 2023, there were no breaches in compliance
with the Council’s approved Treasury Management Policy Statement,
Treasury Management Practices (TMP’s) or lending limits as detailed in TMP
4 (Approved Instruments, Methods & Techniques).  
6.2 Appendix III shows the list of approved counterparties, based on the Council’s
current lending policy, as at August 2023.  
6.3 For the quarter ending 30 June 2023 the average closing cleared bank
balance was £20,195.61 in credit. This reflects the application of the Council’s
“sweep facility” operated by the bank, with any credit balance in excess of
£35,000 being “swept up” overnight to the Council’s instant access account. 
7. INVESTMENT STRATEGY COMPLIANCE AND PERFORMANCE  
7.1  The Treasury Investment Strategy for 2023/24 was approved by the Council
at its meeting on 10 May 2023 (report 23/135 refers).  
7.2 In the current quarter, the level of Council investments peaked at £191.925
million on 19 April 2023 and reduced to £154.050 million by the end of the
quarter. The average daily investment balance over the quarter was £168.004
million, which decreased from an average of £205.159 million in the previous
quarter and from £256.348 million in the same quarter of last year. This
highlights the steady reduction in investment balances over the last year as
funds are applied in financing the approved Capital programme. 
7.3 The Investment Strategy was applied in full over the quarter, with liquidity
being maintained using instant access accounts and money market funds as
detailed in paragraph 5.7 above. There were no other risks identified in the
quarter.   
7.4 The Investment Strategy also incorporates investments held by the Common
Good Funds. All such investments during the quarter were with the Council’s
Loans Fund. The only Council funds held by external fund managers relate to
Council administered Charitable Trusts and are, therefore, not covered by this
Investment Strategy. 
7.5  The budgeted income in 2023/24 for Commercial Property investments is
£2,004,000. There were no new property investments entered into during the
quarter. 
Page 90 of 136

Page 91

8. PRUDENTIAL INDICATORS 
8.1 Prudential Indicators for 2023/24 to 2027/28 were approved by the Council at
the meeting on 10 May 2023 (report 23/135 refers) as part of the Annual
Treasury & Investment Strategy report.  
8.2 The latest estimates of the Prudential Indicators, in line with the Council’s
current approved Capital Budget and Capital Financing (borrowing)
requirements, are shown in Appendix IV. These show that the Council
adhered to all Prudential Limits in the quarter. However, the annual Loan
Charges relative to the Net Revenue stream and the Capital Financing
(Borrowing) Requirement show an increasing trend which reflects the current
Capital Programme and increasing interest rates forecast over the period. 
9. CONCLUSION 
9.1 The Bank of England’s MPC increased the Bank Base Rate from 4.25% to 5%
over the quarter due to continued inflationary pressures, with a subsequent
increase to 5.25% in August 2023. 
9.2 Public Works Loans Board (PWLB) borrowing rates continued to be volatile
over the quarter due to continued inflationary expectations and economic
growth prospects. All PWLB borrowing rates increased over the quarter and
are now currently around three times higher in comparison to the borrowing
rates previously secured by the Council on long-term borrowing undertaken in
2019/20 and 2020/1. 
9.3 Investment activity in the quarter consisted mainly of the use of fixed deposits,
but at a reduced level from the previous quarter. Instant access and Money
market funds were used to meet day-to-day cashflow requirement. Investment
rates increased over the quarter, however, the total level of investments
outstanding reduced. 
9.4 The Council adhered to its Investment Strategy and policies throughout the
quarter, with no breaches in compliance. 
9.5 The Council’s Prudential Indicators were also adhered to throughout the
quarter.    
Page 91 of 136

Page 92

Author(s)
Name  Designation Contact Details
John Jennings  Senior Accountant  CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date 
Stewart MacKenzie
Karen Donaldson 
Head of Finance
Chief Operating Officer 
30 August 2023
30 August 2023 
Page 92 of 136

Page 93

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.
Workforce 
Page 93 of 136

Page 94

2.2 There are no direct workforce implications arising from this report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
4.1 The Chief Executive and the Council’s Treasury advisors, Link Asset
Services, have been consulted in the preparation of this report.   
Page 94 of 136

Page 95

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix I – PWLB Fixed Maturity Interest Rates from 1 April to
30 June 2023.
• Appendix II – Summary of the Treasury Position and Transactions from
1 April to 30 June 2023.
• Appendix III – Approved Investment Counterparty List.
• Appendix IV – Monitoring of Prudential Indicators – Quarter ending
30 June 2023.
Page 95 of 136

Page 96

Page 96 of 136

Page 97

PWLB Fixed Maturity Interest Rates
From 1st April to 1st July 2023
(Certainty Rate)
APPENDIX  I
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
6.50
01-Apr-23
08-Apr-23
15-Apr-23
22-Apr-23
29-Apr-23
06-May-23
13-May-23
20-May-23
27-May-23
03-Jun-23
10-Jun-23
17-Jun-23
24-Jun-23
01-Jul-23
1 Year
5 Years
10 Years
20 Years
30 Years
50 Years
6
Page 97 of 136

Page 98

Page 98 of 136

Page 99

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 APRIL TO 30 JUNE 2023
APPENDIX II
1 LONG TERM BORROWING
(a) Long Term Borrowing 1st April to 30th June 2023
Average Average Amount
No. Rate (%) Life (years) (£)
None 0 0.00% 0.00 0
0 0.00% 0.0 0
(b) Long Term Debt Repayments 1st April to 30th June 2023
Average Amount
No. Rate (%) (£)
PWLB - Maturity Loan - Scheduled Repayments 1 3.30% 5,000,000
1 3.30% 5,000,000
(c) Long Term Debt Outstanding
Outstanding Average Outstanding Average
31-Mar-23 Rate 30-Jun-23 Rate
£ £
Public Works Loan Board 560,000,000 2.40% 555,000,000 2.39%
Money Market Loans (LOBO's) 43,200,000 4.59% 43,200,000 4.59%
Other Long Term Debt 140,000 0.00% 140,000 0.00%
TOTAL 603,340,000 2.56% 598,340,000 2.55%
2 SHORT TERM BORROWING
(a) Short Term Market Borrowing - 1st April to 30th June 2023
Average Average Average Interest
No. Amount (£) Rate (%) Term (Days) (£)
Temporary borrowing 2 4,500,000 4.13% 23 23,103.56
2 4,500,000 4.13% 23 23,103.56
(b) Short Term Borrowing Outstanding
Outstanding Average Outstanding Average
31-Mar-23 Rate 30-Jun-23 Rate
£ £
Market Borrowing 0 0.00% 0 0.00%
Common Good and Charitable Funds 2,293,508 3.93% 2,293,508 3.95%
Local Trusts & Investors 3,117,401 3.63% 4,298,550 4.46%
TOTAL 5,410,909 3.76% 6,592,058 4.28%
6
Page 99 of 136

Page 100

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 APRIL TO 30 JUNE 2023
APPENDIX II
3 INVESTMENTS
(a) Investment Transactions - 1st April to 30th June 2023
Average Average Average Total
Fixed Deposits & Investments No. Amount (£) Rate (%) Term (Days) Interest (£)
Banks 2 7,500,000 5.69% 338 784,349.32
Foreign Banks and Institutions 5 5,600,000 5.53% 249 1,078,586.58
Other Local Authorities 2 5,000,000 4.48% 30 36,780.82
9 4,777,778 5.58% 280 1,899,716.71
Average Average Total
Instant/Notice Accounts & Money Market Funds Amount (£) Rate (%) Interest (£)
Instant Access/Notice accounts 2,212,215 4.24% 34,003.90
Money Market Funds 8,075,298 4.32% 110,777.83
6,120,937 4.31% 144,781.73
(b) Investments Outstanding Outstanding Average Outstanding Average
31-Mar-23 Rate 30-Jun-23 Rate
£ £
UK Banks 99,650,000 3.42% 71,050,000 4.33%
Foreign Banks and Institutions 32,000,000 3.89% 53,000,000 4.69%
Money Market Funds 0 0.00% 0 0.00%
Other Local Authorities 42,000,000 4.47% 30,000,000 4.58%
TOTAL 173,650,000 3.76% 154,050,000 4.50%
Page 100 of 136

Page 101

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Fitch Credit CDS Maximum
Country Rating Range Lending Note (2)
Category 1 - Principal UK Clearing Banks  -  40% Investment total (or £20M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Bank of Scotland (RFB) (5) UK A+, F1 In range 6 months £80million Group limit
Barclays Bank plc (NRFB) (5) UK A+, F1 No data 3 months
Barclays Bank plc (RFB) (5) UK A+, F1 In range 6 months
Goldman Sachs International Bank UK A+, F1 In range 6 months
Handelsbanken plc UK AA, F1+ No data 12 months
HSBC Bank plc (NRFB) UK AA-, F1+ In range 12 months
HSBC Bank plc (RFB) UK AA-, F1+ No data 12 months
Lloyds Bank Corporate Markets Plc (NRFB) UK A+, F1 No data 6 months £80million Group limit
Lloyds Banking Group plc (RFB) UK A+, F1 In range 6 months £80million Group limit
NatWest Markets Plc (NRFB) UK A+, F1 In range 12 months
Royal Bank of Scotland plc (RFB) (inc Nat West) (3) (4) UK A+, F1 Nationalised 12 months Sovereign Rating AA
Santander UK plc (inc Cater Allen) UK A+, F1 No data 12 months
Standard Chartered Bank UK A+, F1 In range 6 months
Sumitomo Mitsui Banking Corporation Europe Ltd UK A, F1 In range 6 months
Category 2 - Foreign Banks & Institutions -  25% Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Australia and New Zealand (ANZ) Banking Group Ltd Aus A+, F1+ In range 12 months
Commonwealth Bank of Australia Aus A+, F1+ In range 12 months
Macquarie Bank Ltd Aus A, F1 No data 6 months
National Australia Bank Ltd Aus A+, F1+ In range 12 months
Westpac Banking Corporation Aus A+, F1+ In range 12 months
BNP Paribas Fortis Bank Belgium A+, F1 No data 1 month Sovereign Rating AA-
KBC Bank Belgium A+, F1 No data 1 month Sovereign Rating AA-
Bank of Montreal Can AA-, F1+ No data 12 months
Bank of Nova Scotia Can AA-, F1+ No data 12 months
Canadian Imperial Bank of Commerce Can AA-, F1+ No data 12 months
National Bank of Canada Can A+, F1 No data 6 months
Royal Bank of Canada Can AA, F1+ No data 12 months
Toronto Dominion Bank Can AA-, F1+ No data 12 months
Danske Bank Denmark A, F1 In range 6 months
Nordea Bank Finland plc Finland AA-, F1+ No data 1 month Sovereign Rating AA+
BNP Paribas France A+, F1 In range 1 month Sovereign Rating AA
Credit Agricole Corporate and Investment Bank France A+, F1 In range 1 month Sovereign Rating AA
Credit Agricole SA France A+, F1 In range 1 month Sovereign Rating AA
Credit Industriel et Commercial France A+, F1 No data 1 month Sovereign Rating AA
DZ Bank AG Germany AA-, F1+ No data 12 months
Landesbank Hessen-Thueringen Girozentral (Helaba) Germany A+, F1+ In range 12 months
Landwirtschaftliche Rentenbank Germany AAA, F1+ No data 24 months
NRW Bank Germany AAA, F1+ No data 24 months
ABN AMRO Bank Netherlands A, F1 No data 6 months
Bank Nederlandse Germeenten Netherlands AAA, F1+ No data 24 months
Cooperatieve Rabobank Netherlands A+, F1+ In range 12 Months
ING Bank Netherlands AA-, F1+ In range 12 Months
DBS Bank Limited Singapore AA-, F1+ No data 12 months
United Overseas Bank Ltd Singapore AA-, F1+ No data 12 months
Skandinaviska Enskilda Banken AB Sweden AA-, F1+ No data 12 months
Svenska Handelsbanken AB Sweden AA, F1+ No data 12 months
Swedbank AB Sweden A+, F1 No data 12 months
UBS AG Switzerland AA-, F1+ In range 6 months
Bank of America, NA USA AA-, F1+ No data 12 months
Bank of New York Mellon USA AA, F1+ No data 24 months
Citibank, NA USA A+, F1 In range 12 months
JP Morgan Chase Bank, NA USA AA, F1+ No data 12 months
Wells Fargo Bank, NA USA AA-, F1+ In range 12 months
6
Page 101 of 136

Page 102

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Category 3 - Subsidiary Banks & Building Societies - 15% of Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
(parent bank shown in brackets)
Subsidiary Banks
None
Building Societies
Nationwide Building Society UK A, F1 No data 6 months
Category 4 - Other Local Authorities - 20% of Investment total (or £20M per Counterparty if higher)
As arranged
Category 5 Money Market Funds - 10% of Investment Total (or £10M per Counterparty if higher)
(Minimum rating required Fitch AAA)
Aberdeen Standard Investments UK AAA
Aviva Investors Liquidity Fund UK AAA
Federated Sterling Liquidity Fund (Class 3) UK AAA
Insight Sterling Liquidity Fund (Class 5) UK AAA
Note:
(1) - Standard & Poor's credit ratings shown, as no Fitch credit rating available
(2) - All Soveriegn credit ratings for above Countries are AAA, unless stated otherwise.
(3) - Banks are part/majority owned by the UK government
(4) - UK Sovereign Rating is AA (Fitch and Standard & Poor's)
Last Updated: 01-Aug-23(5) -  NRFB = Non Ring Fenced Bank,  RFB = Ring Fenced Ban
Page 102 of 136

Page 103

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - QUARTER ENDING 30 JUNE 2023
APPENDIX IV
1 Financing Costs:Net Revenue Stream
The ratio of Capital Financing Costs (Loan Charges) to the Council's net revenue stream shall not exceed the following limits, which are based on historic levels, and allow some headroom
for movement in interest rates. The estimated Financing Costs below are based on the latest monitoring figures.
2023/24 2024/25 2025/26 2026/27 2027/28
Prudential Limit - General Fund 15.00% 15.00% 15.00% 15.00% 15.00%
Estimated Ratio of Financing Costs to Revenue 7.08% 8.60% 10.09% 10.51% 9.99%
Prudential Limit - HRA 30.00% 30.00% 30.00% 30.00% 30.00%
Estimated Ratio of Financing Costs to Revenue 22.37% 22.31% 23.34% 23.55% 22.74%
2 Gross & Net Borrowing and Capital Financing Requirements
For prudence, net external borrowing must not exceed the total capital financing requirement, thus ensuring that over the medium term, borrowing is only undertaken for capital purposes.
The estimated total net borrowing and Capital Financing Requirement at the end of each of the years are as follows:
Actual as at Projected Projected Projected Projected Projected
30-Jun-23 31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27 31-Mar-28
Net External Borrowing* 570,637,000 714,533,000 966,316,000 1,066,099,000 1,120,982,000 1,155,864,000
Gross External Borrowing* 724,687,000 744,533,000 986,316,000 1,086,099,000 1,140,982,000 1,175,864,000
Capital Financing Requirement 720,743,000 837,670,000 1,007,726,000 1,105,967,000 1,161,475,000 1,196,084,000
*For the purpose of this indicator, Borrowing includes the outstanding liability under PPP/PFI contracts.
3 Estimates of Gross Capital Expenditure
The total estimated Capital Expenditure contained within the Council's Budgets for each year is as follows, based on updated monitoring figures.
Composite Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current estimate 209,005,000 195,542,000 111,577,000 67,408,000 48,605,000
Original Budget Estimate (including Budget Motion) 192,880,000 182,661,000 111,465,000 67,816,000 46,219,000
Movement in Estimated Capital Expenditure 16,125,000 12,881,000 112,000 (408,000) 2,386,000
The Original Budget Estimates are those per the 2023/24 to 2027/28 Composite Capital Budget Report on 1 March 2023
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 1 on 13 September 2023.
HRA Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current estimate 24,746,000 13,853,000 15,519,000 19,044,000 19,044,000
Original Budget Estimate 18,457,000 13,858,000 18,669,000 19,044,000 19,044,000
Movement in Estimated Capital Expenditure 6,289,000 (5,000) (3,150,000) 0 0
The Original Budget Estimates are those per the 2023/24 to 2027/28 Housing & Social Wellbeing Budget Report on 25 January 2023.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 1 on 13 September 2023.
6
Page 103 of 136

Page 104

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - QUARTER ENDING 30 JUNE 2023
APPENDIX IV
4 Estimate of Capital Financing Requirement
The estimate (as at July 2023) of the Capital Financing Requirement (ie new borrowing requirement for Capital Expenditure) for each year based on these plans is as follows:
Composite Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current Estimated Capital Financing Requirement 157,207,000 175,445,000 93,069,000 46,776,000 25,377,000
Original Budget Estimate (including Budget Motion) 146,850,000 164,688,000 95,082,000 49,184,000 24,991,000
Movement in Estimated Capital Financing Requirement 10,357,000 10,757,000 (2,013,000) (2,408,000) 386,000
The Original Budget Estimates are those per the 2023/24 to 2027/28 Composite Capital Budget Report on 1 March 2023
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 1 on 13 September 2023.
HRA Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current Estimated Capital Financing Requirement 22,780,000 11,935,000 13,271,000 16,524,000 16,292,000
Original Budget Estimate 16,402,000 11,940,000 16,421,000 16,524,000 16,292,000
Movement in Estimated Capital Financing Requirement 6,378,000 (5,000) (3,150,000) 0 0
The Original Budget Estimates are those per the 2023/24 to 2027/28 Housing & Social Wellbeing Budget Report on 25 January 2023.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 1 on 13 September 2023.
5 External Debt (Gross and Net)
As at Projected Projected Projected Projected Projected
External Borrowing 30-Jun-23 31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27 31-Mar-28
Public Works Loan Board 555,000,000 580,000,000 827,000,000 932,000,000 992,000,000 1,032,000,000
Market Bonds (LOBOs) 43,200,000 43,200,000 43,200,000 43,200,000 43,200,000 43,200,000
Project Borrowing 140,000 0 0 0 0 0
Special Loans 2,293,508 2,293,508 2,293,508 2,293,508 2,293,508 2,293,508
Temporary Loans/Other Borrowing 4,298,550 4,000,000 3,700,000 3,400,000 3,200,000 3,000,000
Other Long Term Liabilities (PPP/PFI) 119,755,227 115,039,977 110,122,727 105,205,477 100,288,227 95,370,977
Total Gross External Debt 724,687,285 744,533,485 986,316,235 1,086,098,985 1,140,981,735 1,175,864,485
Short Term Investments (154,050,000) (30,000,000) (20,000,000) (20,000,000) (20,000,000) (20,000,000)
Long Term Investments 0 0 0 0 0 0
Total Net External Debt 570,637,285 714,533,485 966,316,235 1,066,098,985 1,120,981,735 1,155,864,485
Note:
Operational Boundary 725,000,000 745,000,000 986,000,000 1,086,000,000 1,141,000,000 1,176,000,000
Authorised Limit 1,200,000,000 1,200,000,000 1,200,000,000 1,200,000,000 1,200,000,000 1,200,000,000
The Operational Boundary and Authorised Limit are based on Gross External Debt.
Page 104 of 136

Page 105

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - QUARTER ENDING 30 JUNE 2023
APPENDIX IV
6 Principal Sums Invested Longer Than 365 Days
The Upper Limit for sums invested for over 1 year up to 3 years is £45 million. There were no amounts invested within this period as at the end of the quarter.
7 MATURITY STRUCTURE
The lower and upper limit for the proportion of the Council's total-long term debt which matures in each of  the time bandings below, and is therefore subject to refinancing at the
prevailing market rates, is as follows:
Borrowing Maturity Structure Lower Limit Upper Limit Estimated
Under 12 months 0% 35% 0.68%
over 12 months and < 24 months 0% 35% 2.50%
over 2 years and < 5 years 0% 50% 4.84%
over 5 years and < 10 years 0% 75% 6.00%
over 10 years 10% 95% 85.99%
The maurity profile for the Council's current long-term portfolio as at 30th June 2023, measured from the start of the financial year, is as follows:
Less 1 Year 1 - 2 Years 2 - 5 Years 5 - 10 Years 10 - 20 Years 20 - 30 Years 30 - 40 Years 40 - 50 Years Over 50 Years Total
PWLB 0 13,000,000 20,000,000 17,500,000 5,000,000 0 50,500,000 449,000,000 0 555,000,000
LOBOs 0 0 0 0 0 13,000,000 25,200,000 5,000,000 0 43,200,000
Other 140,000 0 0 0 0 0 0 0 0 140,000
other 4,715,250 4,917,250 14,751,750 25,571,000 66,900,000 2,899,977 0 0 0 119,755,227
Total 4,855,250 17,917,250 34,751,750 43,071,000 71,900,000 15,899,977 75,700,000 454,000,000 0 718,095,227
Percentage 0.68% 2.50% 4.84% 6.00% 10.01% 2.21% 10.54% 63.22% 0.00% 100.00%
Page 105 of 136

Page 106

Page 106 of 136

Page 107

PERTH AND KINROSS COUNCIL 
Finance & Resources Committee 
13 September 2023 
TRANSFORMATION & CHANGE STRATEGY 2022/23-2027/28 – 
UPDATE REPORT 
Report by Chief Executive
(Report No. 23/245) 
1. PURPOSE 
1.1 This report provides an update on the Council’s Transformation & Change
Strategy (Report 22/142), approved by Council in June 2022, and the
Strategic Planning Update and 2023-26 General Fund Budget Report
approved in March 2023 (Report 23/72).  It also shows how the transformation
and change programme acts as an enabler to the delivery of the key strategic
objectives as outlined within the Medium Term Financial Plan 2023-29
(Report 22/249) and the Corporate Plan 2022-27 (Report 22/311). 
1.2 This report outlines the progress made in setting the conditions to support the
organisation through a period of significant change, as well as providing
updates on the projects outlined within the Transformation & Change Strategy
and how they dovetail with the Leadership Review presented to the
Committee in June 2023 (Report No 23/195). 
2. RECOMMENDATIONS 
2.1 It is recommended that the Finance & Resources Committee: 
(i) Notes the contents of the report and the progress to date.
(ii) Approves the use of £240,000 from the earmarked Reserve for
Transformation & Workforce Management to further support the
delivery of key projects as outlined in section 5 of this report. 
(iii) Notes that update/engagement sessions with all Elected Members will
be programmed throughout the year for all Transformation and Change
projects when appropriate.
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
▪ Section 4: Background and Progress Update
▪ Section 5: Proposals 
▪ Section 6: Conclusion 
▪ Appendices 
7
Page 107 of 136

Page 108

4. BACKGROUND AND PROGRESS UPDATE 
4.1 The Transformation & Change Strategy, our Financial Strategy and our
Medium-Term Financial Plan, all align to support the delivery of the Council’s
vision of “a Perth and Kinross where everyone can live life well, free from
poverty and inequality,” together with the strategic priorities and key
objectives outlined with the new Corporate Plan. 
4.2 The Transformation & Change Strategy recognised that due to the size and
complexity of the organisation a range of approaches to change would be
required: 
▪ transforming our customer’s experience 
▪ transforming the shape and structure of our organisation  
▪ transforming our systems and processes 
▪ transforming our spending and response to demand
4.3 It also clearly set out that to support the necessary change we needed to: 
▪ Take a greater collaborative approach to the delivery of our priorities.
▪ Create the environment where staff at all levels could take greater
responsibility, be risk aware and take greater responsibility and ownership
of their own areas of work.
▪ Have a more accessible organisation, with the right information at the right
time for staff to be able to assist and support people more effectively.
▪ Enable staff and managers to adopt more of an enabling and empowering
leadership style.
4.4 It was agreed that the programme would be developed and phased over a five
year period, with work undertaken during year one (2023/24) being key to
setting the foundation for the successful delivery of the programme in future
years.  To build these foundations, our focus during the first year has been
around the Strategic Leadership Review and the nine agreed consolidation
workstreams. The nine identified consolidation workstreams look to identify
opportunities to consolidate functions and activities that are currently
disaggregated, with the aim of reducing any areas of duplication, improving
our systems and processes and putting the customer at the centre. 
4.5 We also recognised that to enable change we needed to set the right
conditions so that our people feel supported through organisational
transformation. Fundamental to supporting staff is our cultural engagement
programme, which has a focus on our purpose, vision and values, ensuring
that these are reflected in our behaviours.  It looks to continue to grow a
culture where individuals are valued and treated with respect. 
4.6 Within the Strategic Planning Update and 2023-26 General Fund Budget
Report approved in March 2023 (Report 23/72), a £500,000 investment was
approved.  This funding has provided additional capacity, enabling a greater
focus on planning and support to the delivery of the overall programme. 
Page 108 of 136

Page 109

4.7 The undernoted diagram is an illustration of the approach we are taking and
will continue to be developed. 
Figure 1 –  Nesta (July 2020) 
Progress Update – Culture 
4.8  We need to create the right conditions to effectively change the way we work,
and which allows us to achieve our aims and objectives. 
4.9 In recognising this, since June 2022 we have held a series of workshops with
staff with the Chief Executive and Executive Leadership Team (ELT)
members where staff have been invited to share their experiences and
contribute to transformation and key organisational topics.  These sessions
have offered staff the opportunity to have discussions around the vision and
values of the organisation and give suggestions for change and improvement. 
4.10 As previously mentioned, the cultural engagement programme is fundamental
to the success of the transformation programme.  The Employee Engagement
Plan 2023/24 sets out the overall approach and a programme of events and
actions to enable staff from across the organisation to become actively
involved. 
4.11 Since April 2023 we have:- 
▪ Held monthly sessions with the Extended Executive Leadership Team to
discuss progress, issues and areas for further collaboration and
improvement. These meetings have had a particular focus on our
leadership culture and provided an opportunity to engage and consult on
the proposals within the leadership review. By holding meetings within
different localities across the Perth and Kinross area the team have had an
opportunity to better understand each locality and meet with local
community representatives to discuss specific priorities and areas for
development and improvement.
Page 109 of 136

Page 110

▪ Provided monthly opportunities for service managers to give and receive
information, collaborate on key issues and work across the organisation,
influence strategic decisions and direction, build relationships and
connections.
▪ Developed and piloted the Leadership Competencies and Performance &
Development Discussion framework which sets out the expectations which
focus on skills and behaviours.
▪ Continued to develop a coaching culture across the organisation with a
range of coaching opportunities such as individual coaching, team
coaching and coaching conversation programmes to equip participants
with the tools, skills, and confidence to have coaching conversations with
their staff and colleagues.
▪ Launched a revised Induction Welcome Event which included an
interactive introduction and welcome to the Council for all new employees.
▪ Introduced a Transformation Learning Programme to support staff at all
levels impacted by change.
▪ Continued our engagement with staff and teams across the organisation
and have developed a programme of Transformation and Change - Make
the Change You Want to See workshops. 
4.12 The Transformation & Change Strategy recognises that we need to evolve
and change.  A significant contributor will be our approach to workforce
management as we go through the change process to enable a shift of
resources to where they are needed most, whilst also developing and skilling
our workforce to meet changing priorities.  These changes will take time to be
fully effective.
Progress Update - Consolidation 
4.13 The Transformation & Change Strategy outlined nine consolidation projects
and intimated a range of other projects which formed Phase 1 of the overall
programme.  Since April 2023 good progress has been made.  This has been
achieved at a time when the Council is going through significant change,
whilst continuing to deliver normal business.   
4.14 The work undertaken through the various consolidation projects informed the
strategic leadership structure, which was approved at the Finance &
Resources Committee on 20 June 2023. 
4.15 The consolidation projects are bringing together disaggregated functions
across the Council under single points of management, addressing gaps and
areas of duplication, delivering efficiencies and a consistent organisational
approach. These projects are also progressing a range of system and process
improvements.  Appendix 1 to this report outlines the overall status of the
programme so far. 
4.16 Project leads have each undertaken significant consultation and engagement
with teams directly impacted by reviews and have also engaged with Elected
Members where appropriate.  An engagement plan with Elected Members has
been developed and will be updated as the programme progresses to
Page 110 of 136

Page 111

continue to enable ongoing communication, engagement and input into the
programme.
4.17 Significant work has been undertaken to get each of the projects through the
planning phase and to the point of developing transition and improvement
plans.  This has involved baselining data, understanding need/demand,
identifying efficiencies and undertaking benchmarking to determine the
optimum operating models.  This has been key to developing the map and
plan for the future, which has now dovetailed with the leadership review. 
Appendix 2 to this report provides further detail on each of the projects, and
the benefits realised to date. 
4.18 Each of the projects have their own benefits and challenges, however there
are some which are common to them all:- 
• Greater collaborative working, with project team members working
together, sharing knowledge and experience, and building relationships.
• The creation of shadow boards in several projects means that decisions
are being made at the right time and by the right people.
• Baselining and benchmarking information has identified where system and
process improvements could be made – placing the customer at the
centre.
• The key challenge for the individual projects teams has been balancing
projects whilst undertaking normal business.  
• Feedback from some community groups have highlighted that they have
seen positive changes in how we work with local communities.
4.19 As highlighted in Appendix 1, at the same time as progressing with the
consolidation projects, progress is being made with Phase 2 projects. These
projects are primarily managed though the relevant Service area(s) and
progress reported to appropriate committee(s), however progress is also
reported through the Transformation & Change Board and supported through
the Programme Management Office. Appendix 3 to this report provides an
overview of the projects and their current status. 
Leadership Review – Progress 
4.20 Work is ongoing to develop and deliver the new strategic leadership structure. 
The recruitment process for the Director posts is underway and the next stage
is the recruitment of the Strategic Leads. The strategic leadership structure
will be fully implemented by April 2024. 
4.21 At the same time the operating model is being developed and workshops
have been held with the ELT, EELT, Leadership Forum and existing Service
Management Teams to establish the risks, issues, and opportunities and to
develop and implement a transition plan. 
Page 111 of 136

Page 112

4.22 Transition arrangements for the transfer of responsibilities, including leading
consolidation projects, to Strategic Leads are underway to ensure timescales
and implementation aligns with the leadership review.  It is difficult at this
stage to have fixed timescales as this will be dictated by the recruitment
process.  Indicative timescales are: 
Consolidation Programme Leadership Review  Timeline
Transformation & Change -
Committee Approval 
Jun-22
Consolidation Reviews - Project
Initiation 
Jun-22 
Review Initiation & Consultation
and Engagement Commenced
Sep-22
Scoping complete  Oct-22
Options Appraisals Complete  Dec-22
Interdependency Mapping &
Agreement on Best Fit 
Jan-23
Budget & Transformation Report –
Council 
Mar-23 
Formal Consultation Complete Jun-23 
Strategic leadership structure
approved by F&R Committee
Jun-23
Operating Models Agreed Director Appointments
Commence
Aug-23 
Strategic Lead Appointments
Commence (following
appointment of Directors)
tbc
Transition Plans Developed  Sep-23
Dovetail with the Leadership Review
(ongoing as appointments are made) 
Oct-23 
Strategic Leadership Structure
Fully Implemented
Apr-24
Project implementation and
improvement plans continuing
(timescales vary according to the
scale and complexity of the project) 
Ongoing 
Savings 
4.23 Savings of £1.042m have been achieved in 2023/24.  With further savings
planned of £1.713m for 2024/25 and £3.288m for 2025/26 across the whole
programme.  In addition, the new Executive & Strategic Leadership Structure
that was approved by the Finance & Resources Committee on 20 June 2023
(Report No. 23/195) will contribute further recurring savings of £789,000 by
2026/27. 
4.24 As projects continue to progress, further savings will be identified.  
Efficiencies will also be achieved through cost avoidance and/or cost
efficiency as a result of streamlined processes and a reduction in the
duplication of activity.  In particular, the Strategic Commissioning and
Page 112 of 136

Page 113

Procurement project presents opportunities for the delivery of savings and
small tests of change in this area have already delivered efficiencies. 
5. PROPOSALS 
▪ Project Leads will continue to take forward identified improvement activity
as well as recognising that transition plans should reflect the impact of
both the leadership review and the Council’s developing operating model.
▪ To take forward the approved transformation & change projects there is a
requirement to provide non-recurring funding as follows – 
o Transforming Services for Children and Young People with Complex
Additional Support Needs - £40,000 in 2023/24 for a Project Manager
post to support this project – this is a multi year appointment with the
remainder of the funding being included in future revenue budgets that
will be agreed by Council in due course.
o Development of financial systems and capacity to roll out
improvements - £100,000 in 2023/24
o Strategic Procurement & Commissioning - £50,000 to provide capacity
in 2023/24
o ALEOS - £10,000 to engage specialist consultancy
o Strategic Planning - £40,000 to increase capacity on a temporary basis
▪ This initial ask of £240,000 will be funded from the earmarked Reserve for
Transformation & Workforce Management.
▪ Elected members will be kept updated on the progress of with projects
through ongoing engagement sessions and workshops as appropriate,
throughout the delivery of the programme. 
6. CONCLUSION   
6.1 This report provides an update on the progress being made to deliver the
Council’s Transformation & Change Strategy.  It also provides an overview of
the progress made to create the conditions for the organisation to change as
well as providing and overview of progress on individual projects. 
6.2 To allow further progress there is also a request to draw additional funding
from the earmarked Reserve to support the delivery of the programme.   
Page 113 of 136

Page 114

Authors
Name  Designation Contact Details
Clare Mailer  Director – Strategy,
People & Resources
ComCommitteeReports@pkc.gov.uk
01738 475000
Carole Hendry Performance &
Business Support
Manager 
Approved 
Name Designation Date
Thomas Glen  Chief Executive  30 August 2023 
APPENDICES 
• Appendix 1 – Overall Programme Status 
• Appendix 2 – Overview of Consolidation Projects 
• Appendix 3 – Overview of Phase 2 Projects 
Page 114 of 136

Page 115

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications  
Corporate Plan 
1.1  The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation. They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people 
• Supporting and promoting physical and mental wellbeing 
• Placing communities at the heart of how we work 
1.2  This report relates to all of these objectives. 
Page 115 of 136

Page 116

2. Resource Implications 
Financial 
2.1  There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Workforce 
2.2  There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT) 
2.3  There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3.  Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3  The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4  The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Sustainability 
3.5  Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions. 
3.6  The information contained within this report has been considered under the
Act. However, no action is required as the Act does not apply to the matters
presented in this report. 
Page 116 of 136

Page 117

4.  Consultation 
Internal 
4.1  The Executive Leadership Team has been consulted in the preparation of this
report. 
2.  BACKGROUND PAPERS 
5.1  No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3.  APPENDICES 
• Appendix 1 – Overall Programme Status
• Appendix 2 – Overview of Consolidation Projects
• Appendix 3 – Overview of Phase 2 Projects 
Page 117 of 136

Page 118

Appendix 1
Overall Programme Status 
Page 118 of 136

Page 119

Appendix 2  
Overview of Phase 1 Consolidation Projects 
Project Overview Benefits/Achievements
Customer
Services
Consolidation of the many
dispersed customer service
functions including
workforce, customer service
centres and systems
Consolidation of dispersed contact centres into 2 Customer Solutions Hubs (Money
and Customer Services), from previous 11 separate contact centres, to enable a
standardised, simplified approach across the Council. This will result in easier
access for customers, getting them to the right place first time. There is also a
potential reduction in telephone menus and licences required for contact centre
technology. 
The “Money” Hub will specialise in handling customer needs in relation to Council
Tax bills, payments, benefits and grants.  This aligns strongly with the Council’s
priority to tackle poverty and support our most vulnerable citizens.   
The second “Customer Services” Hub will deal with all other types of enquiries.
This aligns well with infrastructure, property and environmental matters. 
The new model will focus on customer demand; adoption of new ways of working
and emerging digital technologies. This includes ‘One Front Door’ which will simplify
the customer journey, remove duplication of effort, improve performance reporting
and forecasting of demand and decrease training overheads. The Council
concession application process will be streamlined to ensure customers receive
money/benefits as early as possible. Also, by focusing on digital by default,
customers will receive a more efficient and convenient service, whilst costs are
reduced. 
Press and
Communication
A centrally managed
communications, design
and marketing provision
working to a single
workplan incorporating
consistent service level
agreements for each
service
Bringing together resources from across the organisation into a consolidated team
has enabled additional support to various projects.  For example:- 
• Due to a transfer of resource, additional capacity has been introduced in relation
to video skills, including filming and editing.  
• Housing/tenant communication lead now managed as part of corporate team.
This has resulted in reduced duplication of effort and ensured that content
produced is more effectively shared across relevant channels.
Page 119 of 136

Page 120

Project Overview Benefits/Achievements
• Following a review of the marketing and content creation contract for Perth City
and Towns (our consumer-facing visitor and events channels), the management
of the Facebook and Instagram channels for Perth City and Towns have been
brought into the corporate Communications Team at no additional cost, allowing
co-ordinated oversight of content and meaning that the funding available for the
external contract can now get a better return on investment by focussing on
creating new content and marketing campaigns.
Finance A consolidated model which
brings together corporate
and service teams under
one management business
model with service business
partnering arrangements.
The legislative and
business requirements for
integrated finance functions
serving the Integrated Joint
Board were acknowledged
Finance Project Board (Shadow Board) established to act as an interim
management team during the transition to an integrated Finance function. All
resource issues across teams are now managed through the Board. 
Significant upgrade to the Council’s Financial system, Integra, was successfully
undertaken, with no disruption to service through the migration to Integra Centros.
Operational improvements have been identified which are currently being
implemented, however the move to Integra Centros also creates a platform for
significant improvements in the automation of transactional activity and reporting. 
A baseline assessment of activity is being undertaken, supported through
engagement with the finance teams and stakeholders, to identify opportunities for
efficiencies and the streamlining and improvement of current processes.
Professional &
Business
Support
Consolidated Professional
and Business Support
Services under one
management model, with
staff operating in a business
partner model for each
Service
A single consistent and streamlined approach across the Council for each of the
functions within the remit of professional and business support consolidation
workstream. This supports the removal of silo working, improves and standardises
processes, delivers efficiencies/savings and brings a Team PKC approach to the
areas in scope 
The approved model sets out the two aspects of business support provision being: 
➢ Centrally Designed & Centrally Managed Business Support
➢ Centrally Designed, Locally Delivered Business Support 
Improvements also being made around:- 
Page 120 of 136

Page 121

Project Overview Benefits/Achievements
➢ Committee report writing/political awareness training sessions – Right First Time
approach.  
➢ New system for handling information requests (Freedom of Information / Subject
Access Requests ARS) is being rolled out, resulting in a reduced staffing
resource being required.  
➢ Consolidated Teams and working practices for Business Support.
➢ A series of “quick wins” being considered for implementation. 
Strategic
Planning and
Performance
A strategic planning,
performance, and risk
function under one
business management
model that will support
continuous improvement
evidence-based decision
making and delivery on our
priorities
Systems Mapping – systems mapping exercise carried out, with the aim being to
streamline, consolidate and review the various performance management systems
currently in use.  This will generate efficiencies and potentially savings in terms of
system costs. 
Consolidation – work is underway to find ‘quick wins’, in terms of staff and team
consolidations. 
Human
Resources &
Organisational
Development
Consolidated
Organisational
Development and Human
Resources activity under
one management business
model with business
partnering arrangements for
each Service
Systems Mapping exercise undertaken, leading to the following service
improvements – 
Chatbot (Erica)– rollout of webchat function developed to provide managers and
employees with a live chat function to assist in finding policies/procedures, guidance
and template letters and forms etc both via the external website and EDMS
managers’ site.   
DASH – Internal staff portal for case creation and management.  Phase 1 and
Phase 2 are complete, with Phase likely to be rolled out in September.  The use of
DASH will realise efficiency savings, which are being monitored. 
Recruitment Processes – processes are being reviewed, with the aim of making
the process more effective and efficient for both managers and the recruitment team.   
Resourcelink- a procurement exercise for the HR & Payroll System (Resourcelink)
is required in 24/25 and a scoping and evaluation exercise will be undertaken.  Other
Page 121 of 136

Page 122

Project Overview Benefits/Achievements
processes and efficiencies in payroll and systems will be considered as part of this
exercise. 
Teacher Supply System - developed in conjunction with IT and live from 17 April
2023 – this arrangement has capability to be used for other types of temporary
resourcing i.e. for social care and/or Environmental Consumer Services.  
Community
Engagement
Activity is integrated at a
locality level. Streamlining
of local decision making,
local community action
plans and community grant
schemes
This Review is examining how we engage with communities: to inform and improve
the services we deliver and to widen community participation in local democracy.
The information-gathering and analysis stage was completed in early 2023 and the
Review is now focused on three workstreams: the future shape of local democratic
forums; the future delivery model for community engagement within the Council
including partnership links; and business efficiency measures. The Review will report
to Council in February 2024.
Property Consolidation of all property
related activity into a single
service in a corporate
landlord model, (includes
property development
programmes, including
housing new builds and
improvements and facilities
management)
Early work and improvement actions carried out so far include: 
• Shadow consolidation arrangements in place involving ECS, Housing and
Property staff allowing consolidated approach and sharing of resources.
• Developing a consolidated action plan
• Arrangements for Property Helpdesk has been agreed. 
• Procurement centralised / shared with Property Services QS team– consistency,
planned, efficiency. Linking with “Strategic Procurement & Commissioning”
workstream to maximise value. 
• Contract review across Tayside with Test of Change.
• Head of Establishment compliance improvements.
• Improved Property Asset planning with shadow arrangements in place.
Strategic
Commissioning
and
Procurement
Work is ongoing to develop
a cohesive commissioning
strategy aligned to
priorities, supported by an
effective procurement
function to ensure spend is
directed to where it is most
needed
Early work and improvement actions carried out so far include: 
• Repurposed Corporate Procurement Group to;
- have a more whole system strategic focus.
- support transformation programme and the development of the new strategy
- facilitate better internal collaboration and identify opportunities for savings,
efficiencies and innovation in the interim.
Page 122 of 136

Page 123

Project Overview Benefits/Achievements
- review existing contracts and support more effective contract management.
• Review/revise contract rules – pilot increased threshold from £50k to £250k for
works contracts to reduce workload and encourage more local SMEs. 
• Review and reduce suppliers on PECOS and remove all sundry suppliers – all
sundry suppliers have been removed from PECOS.   
• Pilot product switch with janitorial supplies in schools to demonstrate potential
savings – resulting in cost reduction based on February 2023 prices of £88k
(42%) 
• Working with Scotland Excel on pilot for trades products. 
Page 123 of 136

Page 124

Appendix 3 
Overview of Phase 2 Projects 
Project Overview Progress 
Transforming
Services for
Children and Young
People with
Complex Additional
Support Needs
To transform the experience children
and young people with additional
support needs and their families have
when accessing education and learning
so that they thrive, maximising their
knowledge and skills and confidence to
increase independent living, contribute
to society and lead a fulfilling adult life.
A key challenge is to address failure
demand and continuing to lower/stem
increases in external placement spend.
• Reviewed Nurture classes to form Outreach Team, launched Aug 2022 
• Allocated additional teachers to target additional support needs
• Introduced new support staff roles - Family Learning Practitioners,
Community Learning Assistants, Pupil Care and Welfare Officers
• Reduced independent school placements = £300k redirected to earlier
intervention
• Re-organisation of Inclusion management
The Transformation Board approved funding for a Project Manager to take
this forward.
Whole Family
Wellbeing
Families should be able to access the
help they need, where and when they
need it, for as long as it is needed.
Holistic family support will address the
needs of children and adults in a family
at the time of need rather than at crisis
point. 
• Initially focus on priority groups from SG Child Poverty Delivery Plan,
then widened out to universal provision.  Services must be able to
demonstrate transformation and be self-sustaining by 2026
• Identification and evaluation of current support provision
• Consultation with key stakeholders regarding current good practice and
identification of gaps in provision
• Collaboration with stakeholders and third-sector partners to co-design
and develop evidence based family support options.
• Development of the infrastructure to deliver transformation and
evaluation of the impact of provision.
• Commissioning of services to meet needs (including tests of change
and workforce/leadership development)
• Consolidation of aligned workstreams providing a range of support to
families (including SEF, PEF, MH&W, ADP etc)
ALEOs To review the Council’s arms-length
delivery models for culture and leisure
and recommend any structural/wider
changes required to maximise Council
investment in culture and sport services.
Political and ALEO engagement on options for future delivery is ongoing. 
The Transformation Board has approved funding for financial analysis from
Glasgow Audit at an estimated cost £10k. 
Page 124 of 136

Page 125

Project Overview Progress 
Transport This project will consider how
subsidised local bus services might be
configured to be more efficient,
effective, economic, resilience and
tackle poverty and the climate
emergency. 
This project will include a review of how available funding is spent, routes
and the potential to further employ responsive transport to meet need and
community provided transport including the use of Council vehicles, as well
as how financial support could be offered to people to enable the use of
public transport including collaboration with businesses in our area. 
This project is at Project Initiation stage.  A Project plan, Risk and Issue
logs and communication plans are currently being developed.
Locality Working Building stronger relationships with our
communities and developing new ways
of working to deliver services in a more
joined-up flexible way by being
responsive to needs of different
localities 
Different approaches are currently being tested out within localities.   
Letham – Building on findings from Love Letham and listening to the wider
community groups.  Workshop being arranged to develop our response to
the findings and how we can take an integrated approach. 
Highland – Initial work has been to make internal connections. 
Improvement Services working with the Steering Group and have
developed workstreams and project plan to move forward.  This will also
look to engage with local communities. 
Coupar Angus – Following the completion of the Coupar Angus Action
Plan a multi-disciplinary team approach is being adopted to implement the
plan. This is in the initial stages. 
Crieff – Local community assets mapped, and data reviewed to identity
key inequality issues. The existing Crieff Community Action Plan to be
considered before initiating actions in order to avoid duplication and identify
potential gaps. 
Overall Project Plan is currently being developed. 
Page 125 of 136

Page 126

Page 126 of 136

Page 127

Appendix 1 
Overall Programme Status 
7
Page 127 of 136

Page 128

Page 128 of 136

Page 129

Appendix 2
Overview of Phase 1 Consolidation Projects 
Project Overview Benefits/Achievements
Customer
Services
Consolidation of the many
dispersed customer service
functions including
workforce, customer service
centres and systems
Consolidation of dispersed contact centres into 2 Customer Solutions Hubs (Money
and Customer Services), from previous 11 separate contact centres, to enable a
standardised, simplified approach across the Council. This will result in easier
access for customers, getting them to the right place first time. There is also a
potential reduction in telephone menus and licences required for contact centre
technology. 
The “Money” Hub will specialise in handling customer needs in relation to Council
Tax bills, payments, benefits and grants.  This aligns strongly with the Council’s
priority to tackle poverty and support our most vulnerable citizens.   
The second “Customer Services” Hub will deal with all other types of enquiries.
This aligns well with infrastructure, property and environmental matters. 
The new model will focus on customer demand; adoption of new ways of working
and emerging digital technologies. This includes ‘One Front Door’ which will simplify
the customer journey, remove duplication of effort, improve performance reporting
and forecasting of demand and decrease training overheads. The Council
concession application process will be streamlined to ensure customers receive
money/benefits as early as possible. Also, by focusing on digital by default,
customers will receive a more efficient and convenient service, whilst costs are
reduced. 
Press and
Communication
A centrally managed
communications, design
and marketing provision
working to a single
workplan incorporating
consistent service level
Bringing together resources from across the organisation into a consolidated team
has enabled additional support to various projects.  For example:- 
• Due to a transfer of resource, additional capacity has been introduced in relation
to video skills, including filming and editing.  
7
Page 129 of 136

Page 130

Project Overview Benefits/Achievements
agreements for each
service
• Housing/tenant communication lead now managed as part of corporate team.
This has resulted in reduced duplication of effort and ensured that content
produced is more effectively shared across relevant channels.
• Following a review of the marketing and content creation contract for Perth City
and Towns (our consumer-facing visitor and events channels), the management
of the Facebook and Instagram channels for Perth City and Towns have been
brought into the corporate Communications Team at no additional cost, allowing
co-ordinated oversight of content and meaning that the funding available for the
external contract can now get a better return on investment by focussing on
creating new content and marketing campaigns.
Finance A consolidated model which
brings together corporate
and service teams under
one management business
model with service business
partnering arrangements.
The legislative and
business requirements for
integrated finance functions
serving the Integrated Joint
Board were acknowledged
Finance Project Board (Shadow Board) established to act as an interim
management team during the transition to an integrated Finance function. All
resource issues across teams are now managed through the Board. 
Significant upgrade to the Council’s Financial system, Integra, was successfully
undertaken, with no disruption to service through the migration to Integra Centros.
Operational improvements have been identified which are currently being
implemented, however the move to Integra Centros also creates a platform for
significant improvements in the automation of transactional activity and reporting. 
A baseline assessment of activity is being undertaken, supported through
engagement with the finance teams and stakeholders, to identify opportunities for
efficiencies and the streamlining and improvement of current processes.
Professional &
Business
Support
Consolidated Professional
and Business Support
Services under one
management model, with
staff operating in a business
partner model for each
Service
A single consistent and streamlined approach across the Council for each of the
functions within the remit of professional and business support consolidation
workstream. This supports the removal of silo working, improves and standardises
processes, delivers efficiencies/savings and brings a Team PKC approach to the
areas in scope 
The approved model sets out the two aspects of business support provision being: 
Page 130 of 136

Page 131

Project Overview Benefits/Achievements
➢ Centrally Designed & Centrally Managed Business Support
➢ Centrally Designed, Locally Delivered Business Support 
Improvements also being made around:- 
➢ Committee report writing/political awareness training sessions – Right First Time
approach.  
➢ New system for handling information requests (Freedom of Information / Subject
Access Requests ARS) is being rolled out, resulting in a reduced staffing
resource being required.  
➢ Consolidated Teams and working practices for Business Support.
➢ A series of “quick wins” being considered for implementation. 
Strategic
Planning and
Performance
A strategic planning,
performance, and risk
function under one
business management
model that will support
continuous improvement
evidence-based decision
making and delivery on our
priorities
Systems Mapping – systems mapping exercise carried out, with the aim being to
streamline, consolidate and review the various performance management systems
currently in use.  This will generate efficiencies and potentially savings in terms of
system costs. 
Consolidation – work is underway to find ‘quick wins’, in terms of staff and team
consolidations. 
Human
Resources &
Organisational
Development
Consolidated
Organisational
Development and Human
Resources activity under
one management business
model with business
partnering arrangements for
each Service
Systems Mapping exercise undertaken, leading to the following service
improvements – 
Chatbot (Erica)– rollout of webchat function developed to provide managers and
employees with a live chat function to assist in finding policies/procedures, guidance
and template letters and forms etc both via the external website and EDMS
managers’ site.   
Page 131 of 136

Page 132

Project Overview Benefits/Achievements
DASH – Internal staff portal for case creation and management.  Phase 1 and
Phase 2 are complete, with Phase likely to be rolled out in September.  The use of
DASH will realise efficiency savings, which are being monitored. 
Recruitment Processes – processes are being reviewed, with the aim of making
the process more effective and efficient for both managers and the recruitment team.   
Resourcelink- a procurement exercise for the HR & Payroll System (Resourcelink)
is required in 24/25 and a scoping and evaluation exercise will be undertaken.  Other
processes and efficiencies in payroll and systems will be considered as part of this
exercise. 
Teacher Supply System - developed in conjunction with IT and live from 17 April
2023 – this arrangement has capability to be used for other types of temporary
resourcing i.e. for social care and/or Environmental Consumer Services.  
Community
Engagement
Activity is integrated at a
locality level. Streamlining
of local decision making,
local community action
plans and community grant
schemes
This Review is examining how we engage with communities: to inform and improve
the services we deliver and to widen community participation in local democracy.
The information-gathering and analysis stage was completed in early 2023 and the
Review is now focused on three workstreams: the future shape of local democratic
forums; the future delivery model for community engagement within the Council
including partnership links; and business efficiency measures. The Review will report
to Council in February 2024.
Property Consolidation of all property
related activity into a single
service in a corporate
landlord model, (includes
property development
programmes, including
housing new builds and
improvements and facilities
management)
Early work and improvement actions carried out so far include: 
• Shadow consolidation arrangements in place involving ECS, Housing and
Property staff allowing consolidated approach and sharing of resources.
• Developing a consolidated action plan
• Arrangements for Property Helpdesk has been agreed. 
• Procurement centralised / shared with Property Services QS team– consistency,
planned, efficiency. Linking with “Strategic Procurement & Commissioning”
workstream to maximise value. 
Page 132 of 136

Page 133

Project Overview Benefits/Achievements
• Contract review across Tayside with Test of Change.
• Head of Establishment compliance improvements.
• Improved Property Asset planning with shadow arrangements in place.
Strategic
Commissioning
and
Procurement
Work is ongoing to develop
a cohesive commissioning
strategy aligned to
priorities, supported by an
effective procurement
function to ensure spend is
directed to where it is most
needed
Early work and improvement actions carried out so far include: 
• Repurposed Corporate Procurement Group to;
- have a more whole system strategic focus.
- support transformation programme and the development of the new strategy
- facilitate better internal collaboration and identify opportunities for savings,
efficiencies and innovation in the interim.
- review existing contracts and support more effective contract management.
• Review/revise contract rules – pilot increased threshold from £50k to £250k for
works contracts to reduce workload and encourage more local SMEs. 
• Review and reduce suppliers on PECOS and remove all sundry suppliers – all
sundry suppliers have been removed from PECOS.   
• Pilot product switch with janitorial supplies in schools to demonstrate potential
savings – resulting in cost reduction based on February 2023 prices of £88k
(42%) 
• Working with Scotland Excel on pilot for trades products. 
Page 133 of 136

Page 134

Page 134 of 136

Page 135

Appendix 3 
Overview of Phase 2 Projects 
Project Overview Progress 
Transforming
Services for
Children and Young
People with
Complex Additional
Support Needs
To transform the experience children
and young people with additional
support needs and their families have
when accessing education and learning
so that they thrive, maximising their
knowledge and skills and confidence to
increase independent living, contribute
to society and lead a fulfilling adult life.
A key challenge is to address failure
demand and continuing to lower/stem
increases in external placement spend.
• Reviewed Nurture classes to form Outreach Team, launched Aug 2022 
• Allocated additional teachers to target additional support needs
• Introduced new support staff roles - Family Learning Practitioners,
Community Learning Assistants, Pupil Care and Welfare Officers
• Reduced independent school placements = £300k redirected to earlier
intervention
• Re-organisation of Inclusion management
The Transformation Board approved funding for a Project Manager to take
this forward.
Whole Family
Wellbeing
Families should be able to access the
help they need, where and when they
need it, for as long as it is needed.
Holistic family support will address the
needs of children and adults in a family
at the time of need rather than at crisis
point. 
• Initially focus on priority groups from SG Child Poverty Delivery Plan,
then widened out to universal provision.  Services must be able to
demonstrate transformation and be self-sustaining by 2026
• Identification and evaluation of current support provision
• Consultation with key stakeholders regarding current good practice and
identification of gaps in provision
• Collaboration with stakeholders and third-sector partners to co-design
and develop evidence based family support options.
• Development of the infrastructure to deliver transformation and
evaluation of the impact of provision.
• Commissioning of services to meet needs (including tests of change
and workforce/leadership development)
• Consolidation of aligned workstreams providing a range of support to
families (including SEF, PEF, MH&W, ADP etc)
ALEOs To review the Council’s arms-length
delivery models for culture and leisure
and recommend any structural/wider
changes required to maximise Council
investment in culture and sport services.
Political and ALEO engagement on options for future delivery is ongoing. 
The Transformation Board has approved funding for financial analysis from
Glasgow Audit at an estimated cost £10k. 
7
Page 135 of 136

Page 136

Project Overview Progress 
Transport This project will consider how
subsidised local bus services might be
configured to be more efficient,
effective, economic, resilience and
tackle poverty and the climate
emergency. 
This project will include a review of how available funding is spent, routes
and the potential to further employ responsive transport to meet need and
community provided transport including the use of Council vehicles, as well
as how financial support could be offered to people to enable the use of
public transport including collaboration with businesses in our area. 
This project is at Project Initiation stage.  A Project plan, Risk and Issue
logs and communication plans are currently being developed.
Locality Working Building stronger relationships with our
communities and developing new ways
of working to deliver services in a more
joined-up flexible way by being
responsive to needs of different
localities 
Different approaches are currently being tested out within localities.   
Letham – Building on findings from Love Letham and listening to the wider
community groups.  Workshop being arranged to develop our response to
the findings and how we can take an integrated approach. 
Highland – Initial work has been to make internal connections. 
Improvement Services working with the Steering Group and have
developed workstreams and project plan to move forward.  This will also
look to engage with local communities. 
Coupar Angus – Following the completion of the Coupar Angus Action
Plan a multi-disciplinary team approach is being adopted to implement the
plan. This is in the initial stages. 
Crieff – Local community assets mapped, and data reviewed to identity
key inequality issues. The existing Crieff Community Action Plan to be
considered before initiating actions in order to avoid duplication and identify
potential gaps. 
Overall Project Plan is currently being developed. 