Appendix 2 - Composite Capital Programme - Summary of Capital Resources 2023-24 to 2027-28
Perth and Kinross Council · 13 September 2023
Back to Finance and Resources Committee — 13 September 2023 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actuals Projected Revised Revised Revised Revised Revised Budget Carry Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 31-Jul-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2023/24 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) EDUCATION AND CHILDREN'S SERVICES 61,868 968 (400) 62,436 13,079 62,436 64,304 42,053 15,304 6,823 190,920 COMMUNITIES 101,869 4,654 882 107,405 26,242 107,405 116,800 57,471 38,138 25,996 345,810 HEALTH AND SOCIAL CARE 2,121 (23) (795) 1,303 64 1,303 2,098 1,303 1,303 1,319 7,326 CORPORATE AND DEMOCRATIC SERVICES 12,175 1,287 (4,260) 9,202 1,275 9,202 11,420 8,456 7,440 7,113 43,631 TOTAL NET EXPENDITURE 178,033 6,886 (4,573) 180,346 40,660 180,346 194,622 109,283 62,185 41,251 587,687 (NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS) GENERAL CAPITAL GRANT (22,147) 0 (353) (22,500) (7,457) (22,500) (13,847) (12,639) (12,150) (12,150) (73,286) DEVELOPER CONTRIBUTIONS (2,100) (747) 0 (2,847) 0 (2,847) (2,300) (2,367) (2,600) (2,600) (12,714) CAPITAL RECEIPTS (1,215) (6) 2 (1,219) 0 (1,219) (1,929) (558) (250) (250) (4,206) ANNUAL BORROWING REQUIREMENT 152,571 6,133 (4,924) 153,780 33,203 153,780 176,546 93,719 47,185 26,251 497,481 CAPITAL RECEIPTS BROUGHT FORWARD (2,157) 0 (88) (2,245) (2,245) (2,245) (859) (2,330) (2,638) (2,638) (2,245) CAPITAL RECEIPTS CARRIED FORWARD 1,006 (88) (59) 859 2,245 859 2,330 2,638 2,638 2,638 2,638 TOTAL NET BORROWING REQUIREMENT 151,420 6,045 (5,071) 152,394 33,203 152,394 178,017 94,027 47,185 26,251 497,874
Page 2
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) EDUCATION AND CHILDREN'S SERVICES MIS - Procurement & Integration 57 0 0 0 0 0 0 0 0 MIS - SEEMIS Licensing 0 0 745 147 745 0 0 0 0 745 Blairgowrie Recreation Centre - Replacement 700 24 17,324 4,708 17,324 12,200 4,003 0 0 33,527 Schools Modernisation Programme Investment in the Learning Estate 1,300 85 (3) 1,086 354 1,086 10,688 8,550 8,650 6,823 35,797 Free School Meal Expansion Programme 913 913 1,348 1,348 2,000 0 0 0 3,348 Methven Primary School Refurbishment 280 (17) 14 6 14 250 0 0 0 264 Breadalbane Academy, Aberfeldy - 3G Pitch 0 0 29 18 29 0 0 0 0 29 Third Party Contribution (The Scottish Football Association) 0 0 (29) (14) (29) 0 0 0 0 (29) Kirkmichael Primary School Upgrades 91 (3) 28 32 32 0 0 0 0 32 Capital Receipt (ring-fenced) 0 0 (28) (128) (128) (128) 0 0 0 0 (128) Early Learning & Childcare 38 1 (1) 0 0 0 0 0 0 0 - Letham Primary School Upgrade Project 19 (4) 4 0 0 0 0 0 0 0 - Oakbank Primary School Upgrade Project 0 12 12 12 0 0 0 0 12 - Rattray Primary School Upgrade Project 1,645 (15) 155 22 155 0 0 0 0 155 North/West Perth - New Primary School 39 (2) 1,059 1,059 7,500 15,000 400 0 23,959 Riverside Primary New School 11,228 (15) 3,410 1,635 3,410 0 0 0 0 3,410 Technology Upgrades 15 (22) (250) 128 128 1,016 250 0 0 1,394 Perth Academy - Refurbishment 1,665 (204) 1,311 539 1,311 2,500 2,150 2,150 0 8,111 Perth Grammar School - Upgrade Programme Phase 3 598 6 1,469 128 1,469 1,500 1,500 504 0 4,973 Perth High School - Internal Services & Refurbishment 9 4 16 3 16 0 0 0 0 16 Perth High School - New School Investment 5,836 (56) 30,244 4,053 30,244 26,500 10,600 3,600 0 70,944 Harris Academy/Invergowrie - Extension 1,100 261 (150) 4,211 1,608 4,211 150 0 0 0 4,361 TOTAL: EDUCATION AND CHILDREN'S SERVICES 25,533 968 (400) 62,436 13,079 62,436 64,304 42,053 15,304 6,823 190,920 COMMUNITIES Traffic & Road Safety Road Safety Initiatives (20mph Zones etc..) 0 0 0 0 362 362 362 361 1,447 Additional Road Safety - Pedestrian Crossings 0 0 175 175 175 175 0 0 525 Schools Road Safety Measures 245 (13) 28 422 89 422 0 0 0 0 422 Scottish Government Grant - CWSS (106) 28 (28) 0 0 0 0 0 0 0 20mph Signage Programme - Schools 111 40 129 129 0 0 0 0 129 20mph Signage Programme 0 0 76 76 0 0 0 0 76 Cycling Walking & Safer Routes (CWSR) 987 128 152 1,262 116 1,262 200 200 200 200 2,062 Scottish Government Grant - CWSR (867) (128) (2) (1,112) (1,112) (200) (200) (200) (200) (1,912) Third Party Contribution (TACTRAN) (120) 0 (150) (150) (150) 0 0 0 0 (150) Car Parking Investment 45 15 (1) 291 291 0 0 0 0 291 Car Parking Investment - Pitlochry 0 0 150 150 0 0 0 0 150 Strathmore Cycle Network 0 0 0 0 0 84 0 0 84
Page 3
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Sub-Total 295 70 (1) 1,243 205 1,243 537 621 362 361 3,124 Asset Management - Roads & Lighting Structural Maintenance 13,770 376 394 12,086 4,985 12,086 9,498 9,498 9,706 7,500 48,288 Third Party Contribution (Forestry Commission Timber Routes) (1,316) (176) (109) (285) (13) (285) 0 0 0 0 (285) Traffic Signal Renewals - Upgrading 105 (21) 73 73 0 0 0 0 73 Third Party Contributions (3) 0 0 0 0 0 0 0 0 Footways 524 3 100 538 203 538 410 410 410 410 2,178 Third Party Contributions 0 0 0 0 0 0 0 0 0 Investment in Local Footpaths 0 0 0 0 0 100 100 0 200 Road Safety Barriers 10 (1) 22 22 0 0 0 0 22 Sub-Total 13,090 181 385 12,434 5,175 12,434 9,908 10,008 10,216 7,910 50,476 Asset Management - Bridges Bridge Refurbishment Programme 629 88 (3) 3,654 193 3,654 2,129 1,445 1,746 1,406 10,380 Dalhenzean Culvert 43 15 15 15 0 0 0 264 279 Dunkeld Golf Course 29 6 6 6 0 0 0 219 225 Vehicular Bridge Parapets Programme - Assess & Upgrade 0 0 0 1 0 29 0 0 0 29 Old Perth Bridge - Strengthening 10 10 190 190 10 2,369 0 0 2,569 Perth Queens Bridge - Strengthening 0 0 335 335 60 70 2,153 0 2,618 Garry Viaduct 0 0 110 110 300 300 1,900 1,790 4,400 Culteuchar Culvert 42 (4) 391 5 391 0 0 0 0 391 Glendevon Bridge 235 (2) 2 0 0 0 0 0 0 0 Tullyfergus Bridge 0 0 0 0 0 0 0 134 134 Sub-Total 988 113 (1) 4,701 199 4,701 2,528 4,184 5,799 3,813 21,025 Improvement Schemes A9/A85 Road Junction Improvements 359 271 (1) 270 8 270 0 0 0 0 270 Cross Tay Link Road (CTLR) 37,309 2,661 72,842 18,963 72,842 26,213 0 0 0 99,055 Scottish Government Grant (20,000) 0 (15,000) (15,000) 0 0 0 0 (15,000) A977 Upgrades 0 0 540 8 540 0 0 0 0 540 Brioch Road, Crieff - Road Realignment & Safety Measures 0 0 31 31 0 0 0 0 31 Sub-Total 17,668 2,932 (1) 58,683 18,979 58,683 26,213 0 0 0 84,896 Rural Flood Protection Schemes Almondbank Flood Protection Scheme 93 17 17 5 17 0 0 0 0 17 Revenue Contribution (54) 0 0 0 0 0 0 0 0 Perth Flood Protection Scheme (Pump Replacement) 0 0 0 0 0 0 0 0 0 Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 35 3 354 5 354 0 0 0 0 354 Comrie Flood Protection Scheme 1,847 (10) 7,385 1 7,385 16,841 0 0 0 24,226 Milnathort Flood Protection Scheme 112 27 79 79 1,590 0 0 0 1,669 South Kinross Flood Protection Scheme 115 (15) 225 26 225 1,168 1,787 0 0 3,180 Scone Flood Protection Scheme 5 0 90 90 76 601 0 0 767 Coastal Change Adaptation 0 0 100 100 0 0 0 0 100
Page 4
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Sub-Total 2,153 22 0 8,250 37 8,250 19,675 2,388 0 0 30,313 Perth & Kinross Place-making Mill Street Environmental Improvements 0 0 127 127 0 0 0 0 127 Perth, Place, People 0 0 3,599 3,599 0 0 0 0 3,599 Perth City Centre Golden Route (Rail Station) 15 (5) 10 11 10 0 0 0 0 10 City Greening 0 0 31 31 0 0 0 0 31 Perth & Kinross Lighting Action Plan 875 (131) 2 1,071 228 1,071 677 0 0 0 1,748 Sub-Total 890 (136) 2 4,838 239 4,838 677 0 0 0 5,515 Other Planning Projects Creative Exchange (former St. John's Primary School) 53 53 53 53 0 0 0 0 53 Town Centre - Regeneration & Economic Improvements 26 0 0 0 0 0 0 0 0 Scottish Government Grant (66) 0 0 0 0 0 0 0 0 TCF Revenue Contribution (23) 0 0 0 0 0 0 0 0 Local Full Fibre Network 158 22 22 22 0 0 0 0 22 Third Party Contribution - DCMS 0 0 0 0 0 0 0 0 0 Third Party Contribution - TCF 40 0 0 0 0 0 0 0 0 Third Party Contribution - Tay Cities Deal (198) 0 0 0 0 0 0 0 0 Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 703 139 (1) 429 179 429 0 0 0 0 429 Third Party Contribution - ERDF (266) (52) (162) (162) 0 0 0 0 (162) Third Party Contribution - Tay Cities Deal (436) (86) (267) (267) 0 0 0 0 (267) Perth Eco-Innovation Park at Perth West 0 0 3,000 3,000 20,800 9,017 0 0 32,817 Third Party Contributions - Tay Cities Deal 0 0 (990) (990) (999) (550) (505) (1,956) (5,000) Other Third Party Contributions 0 0 0 0 0 0 (2,000) (3,000) (5,000) Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 0 0 (550) (725) (1,275) Coupar Angus - Strathmore Community Hub 63 0 0 0 0 0 0 0 0 Nature Restoration 206 32 354 386 386 0 0 0 0 386 Third Party Contributions 0 0 0 0 0 0 0 0 0 Sub-Total 260 108 353 2,471 179 2,471 19,801 8,467 (3,055) (5,681) 22,003 City Centre Developments - Cultural Attractions Perth Museum 10,943 301 2,368 2,368 0 0 0 0 2,368 Perth Art Gallery 112 68 3,272 16 3,272 0 0 0 0 3,272 Collections Centre 0 0 0 0 0 0 0 0 0 PH2O 0 0 0 0 30,000 25,000 20,000 15,000 90,000 Sub-Total 11,055 369 0 5,640 16 5,640 30,000 25,000 20,000 15,000 95,640 Community Planning Letham Community Wellbeing Hub 2,552 254 1,571 628 1,571 0 0 0 0 1,571 Scottish Government Grant (Regeneration Fund) (524) 0 0 0 0 0 0 0 0 Third Party Contribution (Letham4All) 0 0 (519) (519) 0 0 0 0 (519) Revenue Contribution (Place Based Development Grant) (735) 0 0 0 0 0 0 0 0 Sub-Total 1,293 254 0 1,052 628 1,052 0 0 0 0 1,052
Page 5
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Page 6
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Community Greenspace Play Areas - Improvements Implementation Strategy 92 6 503 27 503 987 878 150 150 2,668 Third Party Contribution (47) (10) (10) (10) 0 0 0 0 (10) Revenue Contribution (Developer Contribution Reserve) (2) 0 0 0 0 0 0 0 0 3G Pitch, Blairgowrie 38 20 20 20 100 0 0 0 120 Settlement/Neighbourhood Parks 25 (26) 27 1 1 0 0 0 0 1 Countryside Sites 23 (1) 1 0 0 139 0 0 0 139 Community Greenspace Sites 0 0 (30) (30) (30) 654 682 682 678 2,666 Community Greenspace Bridges 38 (1) 53 53 0 0 0 0 53 Core Path Implementation 48 9 9 3 9 0 0 0 0 9 Third Party Contribution (60) (21) (21) (21) 0 0 0 0 (21) Alyth Environmental Improvements 0 0 0 0 0 0 0 0 0 Premier Parks 39 (6) 8 8 0 0 0 0 8 Auchterarder Public Park 324 32 1 33 18 33 0 0 0 0 33 Revenue Contribution 0 (3) (3) (3) 0 0 0 0 (3) Third Party Contribution (201) 0 0 0 0 0 0 0 0 The Knock 9 0 0 0 0 0 0 0 0 Third Party Contribution 0 (3) (3) (3) 0 0 0 0 (3) Kinnoull Hill 8 4 4 4 0 0 0 0 4 Cemetery Extensions 25 15 459 459 150 100 100 100 909 Sub-Total 359 15 (1) 1,023 48 1,023 2,030 1,660 932 928 6,573 Waste Strategy Recycling Improvement Fund 358 208 (208) 2,363 26 2,363 0 0 0 0 2,363 Scottish Government Grant (358) (208) 208 (2,363) (2,363) 0 0 0 0 (2,363) Sub-Total 0 0 0 0 26 0 0 0 0 0 0 Support Services PC Replacement & IT Upgrades Hardware 22 1 16 1 16 15 15 14 14 74 Licenses 198 64 152 65 152 112 95 71 71 501 Sub-Total 220 65 0 168 66 168 127 110 85 85 575 Commercial Property Investment Programme North Muirton Industrial Estate - Site Servicing & Provision of Units 18 17 57 57 0 0 0 0 57 Broxden Business Park - Additional Infrastructure 17 (10) 20 10 10 0 0 0 0 10 Western Edge, Kinross - Site Servicing 17 4 1 5 5 0 0 0 0 5 Additional Infrastructure Investment - Broxden 46 46 (46) 0 0 0 0 0 0 0 Broxden Drainage Mitigation Works 308 237 401 638 638 866 0 0 0 1,504 Third Party Contribution (Scottish Water) (239) (239) (231) (470) (470) (658) 0 0 0 (1,128) Ruthvenfield Business Centre 301 18 1,372 1,372 0 0 0 0 1,372 Third Party Contribution (115) 0 0 0 0 0 0 0 0 North Muirton Drainage 47 17 17 17 0 0 0 0 17 North Muirton Industrial Estate Expansion Land - Servicing 0 0 0 0 0 0 0 0 0
Page 7
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Sub-Total 400 90 145 1,629 0 1,629 208 0 0 0 1,837 Prudential Borrowing Projects Wheeled Bin Replacement Programme - Domestic Bins 265 4 (1) 203 12 203 200 200 200 200 1,003 Wheeled Bin Replacement Programme - Commercial Bins 39 15 35 35 20 20 20 20 115 Recycling Containers, Oil Banks & Battery Banks Replacement Progra 54 28 150 150 65 65 65 65 410 Capital Receipts - Disposals (4) 0 0 0 0 0 0 0 0 Litter Bins 25 0 25 5 25 50 50 50 50 225 Smart Cities - Smart Waste 172 11 1 145 46 145 0 0 0 0 145 Third Party Contribution (ERDF) (67) (2) (53) (53) 0 0 0 0 (53) Vehicle Replacement Programme 1,242 57 (1) 1,813 301 1,813 3,300 3,300 3,300 3,000 14,713 Capital Receipts - Vehicle Disposals (118) (4) (276) (22) (276) (377) (377) (377) (347) (1,754) Crematorium - Abatement Works 9 (1) 1 0 0 0 0 0 0 0 Street Lighting Renewal - LED & Column Replacement 650 38 (1) 804 120 804 888 825 541 592 3,650 Smart Cities - Intelligent Street Lighting 0 (3) 3 0 0 0 0 0 0 0 LED Traffic Signal Replacement 146 4 4 4 4 0 0 0 0 4 Almondbank Flood Protection Scheme 4 4 (1) 3 3 0 0 0 0 3 Land Purchase & Development (Hotel Development) 0 0 0 0 950 950 0 0 1,900 Technology & Innovation Incubator Units 0 0 0 0 0 0 0 0 0 Sub Total 2,417 151 1 2,853 466 2,853 5,096 5,033 3,799 3,580 20,361 Housing Projects Gypsy Travellers Site Improvement Works 207 195 195 195 0 0 0 0 195 Additional Gypsy Traveller Site Improvement Works 225 216 9 225 3 225 0 0 0 0 225 Scottish Government Grant 0 (24) 24 0 (24) 0 0 0 0 0 0 Gypsy Traveller Site Community Improvement Works 33 33 (33) 0 0 0 0 0 0 0 New Gypsy Traveller Site 0 0 2,000 2,000 0 0 0 0 2,000 Sub Total 465 420 0 2,420 (21) 2,420 0 0 0 0 2,420 TOTAL: COMMUNITIES 51,553 4,654 882 107,405 26,242 107,405 116,800 57,471 38,138 25,996 345,810 Health & Social Care Occupational Therapy Equipment 250 0 250 250 250 250 250 250 1,250 Technology Enabled Telecare 450 (13) (537) 1,000 64 1,000 1,537 1,000 1,000 1,000 5,537 Moving & Handling Office Refurbishment 0 0 (29) 0 0 29 0 0 0 29 Software Licences 43 (10) 53 53 53 53 53 69 281 Developing Supported Tenancies 0 0 (229) 0 0 229 0 0 0 229 TOTAL: HEALTH & SOCIAL CARE 743 (23) (795) 1,303 64 1,303 2,098 1,303 1,303 1,319 7,326
Page 8
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28 APPENDIX II Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget 26-Apr-23 Forward Adjustment 13-Sep-23 31-Jul-23 13-Sep-23 13-Sep-23 13-Sep-23 13-Sep-23 from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) CORPORATE AND DEMOCRATIC SERVICES Property Services DDA Adaptation & Alteration Works Programme 174 10 410 87 410 200 200 200 200 1,210 Property Compliance Works Programme 1,626 198 627 2 627 650 650 650 650 3,227 Capital Improvement Projects Programme 1,937 425 2,275 85 2,275 1,800 1,800 1,800 894 8,569 Pitlochry High School - Upgrade Programme 465 56 316 67 316 0 0 0 0 316 Community School of Auchterarder - Structural Improvements 736 0 0 0 0 0 0 0 0 CO2 Monitors for Schools Programme 81 0 0 0 0 0 0 0 0 Energy Efficiency Works - Various Properties 0 0 (72) 27 27 27 0 0 0 0 27 Revenue Contribution (Salix Reserve) 0 0 72 (27) (27) 0 0 0 0 (27) Decarbonisation - Prudential Borrowing Programme (PB) 0 0 (1,300) 700 700 1,300 0 0 0 2,000 Energy Conservation & Carbon Reduction Programme (PB) 178 (2) 138 43 138 150 150 150 150 738 Information Systems & Technology ICT Infrastructure Replacement and Upgrade Programme 2,055 104 (354) 2,416 730 2,416 4,207 4,079 3,017 2,903 16,622 Data & Analytics 415 167 (442) 600 97 600 839 738 761 784 3,722 Third Party Contribution (ERDF) 0 0 0 0 0 0 0 0 0 Supporting Digital 700 8 (564) 750 30 750 855 878 901 926 4,310 Software Licences (Revenues & Benefits) 52 0 50 50 51 51 51 51 254 School Audio-Visual (AV) Equipment Replacement Programme 1,300 272 (798) 100 9 100 173 35 35 555 898 Mosaic - Swift Social Work System Replacement 412 49 (802) 820 98 820 1,319 0 0 0 2,139 Revenue Contribution 0 0 0 0 (124) (125) (125) 0 (374) Customer Service Blueprint 0 0 0 0 0 0 0 0 0 TOTAL: CORPORATE AND DEMOCRATIC SERVICES 10,131 1,287 (4,260) 9,202 1,275 9,202 11,420 8,456 7,440 7,113 43,631 TOTAL COMPOSITE NET EXPENDITURE 87,960 6,886 (4,573) 180,346 40,660 180,346 194,622 109,283 62,185 41,251 587,687 (NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS) CAPITAL RECEIPTS General Capital Grant - Scottish Government (14,739) 0 (353) (22,500) (7,457) (22,500) (13,847) (12,639) (12,150) (12,150) (73,286) Developer Contributions (1,549) (747) (2,847) (2,847) (2,300) (2,367) (2,600) (2,600) (12,714) General Fund - Capital Receipts/Disposal (8) (4) 0 (976) 0 (976) (250) (250) (250) (250) (1,976) Commercial Property - Capital Receipts/Disposal (1) (2) 2 (243) 0 (243) (1,679) (308) 0 0 (2,230) Total: Capital Receipts (16,297) (753) (351) (26,566) (7,457) (26,566) (18,076) (15,564) (15,000) (15,000) (90,206) Annual Composite Borrowing Requirement 71,663 6,133 (4,924) 153,780 33,203 153,780 176,546 93,719 47,185 26,251 497,481 CAPITAL RECEIPTS BROUGHT FORWARD (2,556) 0 (88) (2,245) (2,245) (2,245) (859) (2,330) (2,638) (2,638) (2,245) CAPITAL RECEIPTS CARRIED FORWARD 2,157 (88) (59) 859 2,245 859 2,330 2,638 2,638 2,638 2,638 TOTAL NET COMPOSITE BORROWING REQUIREMENT 71,264 6,045 (5,071) 152,394 33,203 152,394 178,017 94,027 47,185 26,251 497,874
Page 9
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II EDUCATION AND CHILDREN'S SERVICES Project Project Description MIS - Procurement & Integration Schools Management Information System MIS - SEEMIS Licensing Licencing of Schools Management Information System Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our existing school estate Free School Meal Expansion Programme Upgrading kitchen and dining facilities to provide the enhanced Free School Meals programme Methven Primary School Refurbishment Upgrade of Methven Primary School facilities Breadalbane Academy, Aberfeldy - 3G Pitch Additional investment required to upgrade 2G to 3G Kirkmichael Primary School Upgrades Upgrade of Kirkmichael Primary School facilities Early Learning & Childcare - Letham Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure - Completed - Oakbank Primary School Upgrade Project 1140 hrs project - Completed - Rattray Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure - Completed North/West Perth - New Primary School New primary school located at Bertha Park Riverside Primary New School Replacement of North Muirton and Balhousie primary schools Technology Upgrades Upgrade to practical teaching environment within the existing school estate Perth Academy - Refurbishment Investment to upgrade the infrastructure and environment of the Perth Academy including structural work to sports block, lighting upgrades, classroom upgrades and science block cladding Perth Grammar School - Upgrade Programme Phase 3 Investment to upgrade the infrastructure and environment of the Perth Grammar School including structural work to assembly hall, AV and WiFi upgrades, classroom refurbishment and door upgrades Perth High School - Internal Services & Refurbishment Necessary works to the infrastructure and environment of the current Perth High School Perth High School - New School Investment Replacement of the existing Perth High School Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy in Dundee for continuation of access for pupils based in Invergowrie COMMUNITIES Project Project Description Traffic & Road Safety Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities Road Safety Improvement Fund works Provision of safety barriers on routes where motor cycling is common Schools Road Safety Measures A programme of works to improve road safety in the vicinity of schools 20mph Signage Programme - Schools A programme of works to improve road safety in the vicinity of schools 20mph Signage Programme A programme of works to introduce 20mph speed limits. Cycling Walking & Safer Routes (CWSR) A programme of works providing infrastructure for cycling, walking and safer routes Car Parking Investment Construction of new car park in Auchterarder Car Parking Investment - Pitlochry Purchase of land and construction of a public car park Strathmore Cycle Network Contribution towards a shared use path between Coupar Angus and Blairgowrie Structural Maintenance Road maintenance to extend the life of roads, including predominately road resurfacing, surface dressings, installing new drainage infrastructure and repairs to and replacement of defective embankments and retaining walls Asset Management - Roads & Lighting
Page 10
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II Project Project Description Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal infrastructure Footways Replacement of existing deteriorated footway surfaces Investment in Local Footpaths A programme of works to improve and provide local footpaths Road Safety Barriers Renewal of existing barriers where unrecoverable damage has occurred and renewal of barriers where timber posts have been used in construction
Page 11
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II Project Project Description Bridge Refurbishment Programme Used to appoint specialist external inspection teams and consultants to carry out specialist access bridge inspections and assessments Dalhenzean Culvert Culvert replacement project (later years) Dunkeld Golf Course Culvert replacement project (later years) Vehicular Bridge Parapets Programme - Assess & Upgrade Assessment and Upgrading of Vehicle Parapets Programme Old Perth Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a range of assessment, investigation, strengthening and improvement works Perth Queens Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a range of assessment, investigation, strengthening and improvement works Garry Viaduct Replacement of Bearings and Parapets; including strengthening of deck for bearing replacement jacking up, and to cater for increased parapet vehicular deterrent capacity Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert Glendevon Bridge Major bridge repair works required due to severe river scour damage (now complete) Tullyfergus Bridge Installation of scour protection to protect existing bridge abutments (later years) A9/A85 Road Junction Improvements New infrastructure including a new A9 overbridge, a bridge over the River Almond and road linking the A85 to Inveralmond and Bertha Park (Phase 1 of Perth Transport Futures Project) - complete Cross Tay Link Road (CTLR) New road and major structure over the River Tay, linking the A9 north of Inveralmond and the A94 north of Scone (Phase 2 of Perth Transport Futures Project). A977 Upgrades A programme of works to improve road safety along the A977. Broich Road, Crieff - Road Realignment & Safety Measures Complete Almondbank Flood Protection Scheme Substantially complete Perth Flood Protection Scheme (Pump Replacement) Complete Perth Flood Protection Scheme (South Inch Culvert Reinstatement) Ground investigation and monitoring then design project to refurbish existing culvert Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Comrie Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Milnathort South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in South Kinross Scone Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Scone Coastal Change Adaptation Design and construct projects to deal with incidents of coastal erosion Mill Street Environmental Improvements Potential compensation payments associated with claims against compulsory land acquisition to enable delivery of environmental improvements to stimulate and support development and investment Perth, Place, People Design and development of sustainable transport corridors to improve access to and from Perth and enable additional development and improvement within Perth city centre Perth City Centre Golden Route (Rail Station) Design and development of improvements to access, signage and animation from rail and bus station to Perth city centre to complement improvements to integration of transport Asset Management - Bridges Improvement Schemes Rural Flood Protection Schemes Perth & Kinross Place-making
Page 12
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II Project Project Description City Greening Improvements to support enhancement of retail trading environment and residential areas and enhanced use of space for markets, events and alfresco use
Page 13
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II Project Project Description Perth & Kinross Lighting Action Plan Architectural and creative lighting to enhance city and towns appearance, reduce energy cost and increase safety at nighttime to increase dwell time, support the hospitality sector, events and grow the evening economy Creative Exchange (former St. John's Primary School) Repurposing old school to offer space to creative industry businesses and create the Famous Grouse Idea Centre, a space to support business innovation. Complete Town Centre - Regeneration & Economic Improvements Complete Local Full Fibre Network Provision of gigabit fibre connectivity to Council's buildings to unlock gigabit connectivity for surrounding communities. Completed Low Carbon Transport & Active Travel Hub - Broxden EV Chargers Provision of fast EV chargers combined with solar power generation and battery storage at Broxden Park & Ride - Near completion Perth Eco-Innovation Park at Perth West Provision of enabling infrastructure (access road, A9 underpass and unit platforms) to develop 25ha of employment land supporting clean growth, business innovation and jobs - Phase 1 (11ha) - In development Coupar Angus - Strathmore Community Hub Complete Nature Restoration Protection and restoration of biodiversity focusing on over-exploitation of the natural environment and addressing its consequences; habitat loss and fragmentation; and invasive non-native species - 22/23 completed - 23/24 started Perth Museum Refurbishment of Perth City Hall to create new museum spaces and cafe. Main construction phase complete and install/fit out on schedule for planned opening spring 2024 Perth Art Gallery Refurbishment of temporary galleries - scheduled for completion November 2023 Collections Centre Project removed from programme PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink. On hold pending outcome of Leisure and Culture Assets Review Letham Community Wellbeing Hub Refurbishment of Letham Wellbeing Hub to offer a range of services to the local community managed by Letham4All - scheduled for completion end 2023 Play Areas - Improvements Implementation Strategy Regular refurbishment of 146 play areas based on approx. 6-8 per year. Involves community engagement and often co-funding and design of the sites 3G Pitch, Blairgowrie Two phase community led project to provide a new full sized 3G football pitch and pavilion Settlement/Neighbourhood Parks Refurbishment of neighbourhood parks working in partnership with communities to improve, update and renew worn out or obsolete infrastructure Countryside Sites Refurbishment of more natural parks and open spaces Community Greenspace Sites Main fund for all Community Greenspace Sites which is drawn down to support the overall capital programme of refurbishments and upgrades Community Greenspace Bridges Refurbishment programme for all bridges on Community Greenspace sites Core Path Implementation Holding budget for Crieff Comrie Core path development mainly funded through Sustrans Alyth Environmental Improvements Town centre upgrade including community led refurbishment of the burnside - complete Premier Parks Small budget to facilitate refurbishment of former Premier Park upgrades Other Planning Projects City Centre Developments - Cultural Attractions Community Planning Community Greenspace
Page 14
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II Project Project Description Auchterarder Public Park Major play area upgrade co-funded and designed with the community The Knock Complete Kinnoull Hill Complete Cemetery Extensions Funding to allow the extension of existing or development of new cemeteries to address the pressure for burial space
Page 15
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II Project Project Description Recycling Improvement Fund External Scottish Government funding (Recycling Improvement Fund) to roll out 4th bin to householders for recycling Hardware Funding of additional or bespoke IT Hardware for Communities Staff Licenses Funding of software contracts North Muirton Industrial Estate - Site Servicing & Provision of Units Only road adoption works remaining Broxden Business Park - Additional Infrastructure Only road adoption works remaining Western Edge, Kinross - Site Servicing Only road adoption works remaining Additional Infrastructure Investment - Broxden Complete Broxden Drainage Mitigation Works Drainage/pumping station works underway and subject to agreement/contribution from Scottish Water Ruthvenfield Business Centre Works on redevelopment in progress North Muirton Drainage Drainage/pumping station underway North Muirton Industrial Estate Expansion Land - Servicing Complete Wheeled Bin Replacement Programme - Domestic Bins Replacement of damaged and end of life wheeled bins for households. Also suppling bins for new properties Wheeled Bin Replacement Programme - Commercial Bins Replacement of damaged and end of life wheeled bins for commercial customers. Also suppling bins for new customers and changes to collection contracts Recycling Containers, Oil Banks & Battery Banks Replacement Programme Replacement of damaged and end of life oil and battery banks Litter Bins Replacement of damaged and end of life litter bins and/or for general supply of litter bins where required. Smart Cities - Smart Waste Programme now complete - included introduction of In Cab system for refuse vehicles, fill level sensors on city centre litter bins Vehicle Replacement Programme Fleet vehicle replacement programme Crematorium - Abatement Works Complete Street Lighting Renewal - LED & Column Replacement Street Lighting LED conversion and column replacement programme Smart Cities - Intelligent Street Lighting Complete LED Traffic Signal Replacement Complete Almondbank Flood Protection Scheme Under Rural Flood Land Purchase & Development (Hotel Development) Development agreement secured and release of grant for heritage subject to progression through planning and cost evidence Technology & Innovation Incubator Units Complete Gypsy Travellers Site Improvement Works Programme of works for improvements on Gypsy Traveller sites at Bobbin Mill and Double Dykes Additional Gypsy Traveller Site Improvement Works Additional funding to support improvements works programme on Gypsy Traveller sites Gypsy Traveller Site Community Improvement Works Funding from Gypsy Traveller Scottish Government Funding Bid for replacement of chalets at Double Dykes New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site CORPORATE AND DEMOCRATIC SERVICES Project Project Description DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council Buildings - e.g. Ramps/Lifts/Door Access/Accessible Toilets and Changing Areas Prudential Borrowing Projects Housing Projects Property Services Waste Strategy Support Services - PC Replacement & IT Upgrades Commercial Property Investment Programme
Page 16
PERTH AND KINROSS COUNCIL DESCRIPTIONS OF CAPITAL PROJECTS APPENDIX II Project Project Description Property Compliance Works Programme To ensure compliance with current and changing legislation including - New Fire Alarms; Lighting; Wiring; Fire Protection Works; Gas pipework within buildings and Roof Restraint safety systems Capital Improvement Projects Programme Roof Upgrades; Full internal refurbishment works; New Heating Systems; Boilers and pipework; Structural Upgrades; Small extensions; New Windows/Doors; New Fencing; New Cladding Pitlochry High School - Upgrade Programme Upgrades to Mechanical and Electrical Infrastructure, including rewiring, heating and controls systems, replacement lighting and consequential building works such as new ceilings, painting and flooring Community School of Auchterarder - Structural Improvements Undertake Structural improvement works following recommendations of Edinburgh schools report CO2 Monitors for Schools Programme Installation of CO2 monitors throughout the Property estate to monitor air quality and improve ventilation systems where necessary Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to reduce energy cost across the property estate Decarbonisation - Prudential Borrowing Programme (PB) This budget will support PKCs path to NetZero and focus primarily on the de-carbonisation of heat and replacing inefficient direct emissions heat sources Energy Conservation & Carbon Reduction Programme (PB) This budget is focused on works to reduce PKC energy consumption and help achieve annual KPI energy reduction of 3% ICT Infrastructure & Replacement and Upgrade Programme This Programme delivers the IT / digital environment, digital resources and systems required by staff and young people. The programme maintains, supports and develops computers; networks; telephony; Microsoft systems; connectivity and equipment; datacentres; servers; file storage and back up; security systems and video conferencing Data & Analytics Delivers the governance, tools, technologies and organisation-wide skills required for optimising value from Council data, driving informed decision making around resources, priorities and service delivery targets Supporting Digital Develops the capabilities we need to be an innovative digital organisation. Including developing the Council’s corporate employee (mobile working) and customer (online services) platforms, to create new digital products and services; investment in tools such as Microsoft; resourcing innovation and building digital skills, insight and expertise Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team School Audio-Visual (AV) Equipment Replacement Programme Ensures all Perth and Kinross classrooms have equitable access to audio visual panels and the digital skills to exploit these resources for learning and teaching Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system to replace SWIFT Information Systems & Technology