Perth & Kinross Council 
Finance & Resources Committee 
13 September 2023 
REVENUE BUDGET 2023/24 – UPDATE NO. 1 
Contact Officer: Scott Walker, Chief Accountant
(Report No. 23/242) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2023/24 General Fund
Revenue Budget based upon the June 2023 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected over spend on the 2023/24 General Fund
Management Budget is £1.008 million (see Appendix 1). 
2. RECOMMENDATIONS 
2.1 The Committee is requested to: 
A. note the contents of the report, 
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2, 
C. note the projected outturn for Corporate Budgets set out in Section 6, 
D. note the funding update provided in Section 7, 
E. note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 3, 
F. approve the adjustments to the 2023/24 Management Revenue Budget
detailed in Sections 10,11 & 12 and Appendices 1, 2, 4, 5, and 6, 
G. note the financial risks set out in Section 13 and Appendix 7. 
3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 Issues Arising from Financial Year 2022/23

Page 2

Section 10 2023/24 Additional Funding
Section 11 2023/24 Virements
Section 12 2023/24 Movements in Reserves
Section 13 Financial Risks
Section 14 Conclusions 
4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2023/24 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the June 2023 ledger, updated
for any subsequent known material movements. 
4.2 The budget total reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the 2023/24 Final Revenue Budget on 1
March 2023 (Report No. 23/72 refers).  In addition, adjustments approved by
the Finance & Resources Committee on 26 April 2023 (Report No. 23/120
refers) and Executive Sub-Committee of the Finance and Resources
Committee on 24 July 2023 (Report No. 23/219 refers) are reflected in
Appendix 1 (Column 2). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 The total net projected under spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £161,000 which represents
0.04% of total net Service expenditure. 
5.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below.   
5.3 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted inflation
levels.  This is already being seen in the cost of the materials required by
property and housing maintenance teams.  Going forward, this may continue
to have an impact on projected outturns and future years’ budgets. 
Education & Children’s Services 
5.5 The projected outturn for Education & Children’s Services excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
anticipated to be on target against budget.  The individual elements
contributing to this position is summarised in the following table and narrative.

Page 3

Function Projected Outturn Movement 
£’000 % £’000
Education Services Over spend 345 0.5 -
Children, Young People & Families Under spend (20) (0.1) -
Business & Resource Services Under spend (51) 0.7 -
Catering Services Under spend (274) (3.8) -
TOTAL  - - - 
5.6 Within non devolved Education Services there is a net projected over
spend of £345,000.  This is made up of the non-achievement of staff slippage
(£253,000), reduced income (£88,000) and loan charges (£36,000) partially
offset by savings on non-domestic rates (£32,000). 
5.7 In Services for Children, Young People & Families there is a net projected
under spend of £20,000.  Within this projection there is a net under spend on
support for young people and additional income partially offset by projected
over spends on legal & translation fees, and client travel partially. 
5.8 In Business & Resource Services there is a net under spend of £51,000
due to staff slippage partially offset by reduced school let income. 
5.9 In Catering Services there is a net projected under spend of £274,000 due to
updated meal projections. 
5.10 The Devolved School Management Scheme is currently projected to be on
target.  However, schools are experiencing challenges in delivering approved
staff slippage targets.  The budgets for the Devolved School Management
scheme are allocated by financial year (April – March), whereas expenditure
is incurred by academic year (August – June). 
5.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2024.  It is anticipated that the projected under
spend on teacher and support costs will be carried forward to 2024/25 to meet
commitments.  The budgets for the Pupil Equity Fund scheme are allocated
by financial year, whereas expenditure is incurred by academic year. 
Communities 
5.12 The projected outturn for Communities is currently anticipated to be £140,000
more than budget, which represents 0.2% of the Service Management
Budget.  The projected over spend is summarised in the following table and
narrative.

Page 4

Function Projected Outturn Movement 
£’000 % £’000
Environmental & Consumer Services Over spend 45 0.1 -
Planning & Development Over spend 30 0.5 -
Housing Over spend 40 0.5 -
Business & Resources Over spend 25 0.4 -
TOTAL Over Spend 140 0.2 
5.13 In Environmental & Consumer Services there is a projected net over spend
of £45,000.  The projected over spend is made up of additional costs relating
to hire costs (refuse collection vehicles), consultancy fees (operational assets)
and reduced income in corporate health & safety.  These are partially offset
by a net projected under spend on fleet management and additional income
from Bereavement Services. 
5.14 In Planning & Development there is a projected over spend of £30,000 in
relation to Perth Harbour.   
5.15 In Housing there is a projected over spend of £40,000 due to energy costs at
Greyfriars Hostel and void rent loss in relation to housing support properties. 
5.16 Within Business & Resources there is a projected over spend of £25,000
due to additional costs at Perth Bus Station.   
Corporate & Democratic Services 
5.17 The projected outturn for Corporate & Democratic Services is currently
anticipated to be £282,000 less that budget which represents 1% of the net
Service budget.  The main movements are summarised in the following table
and narrative. 
Function Projected Outturn Movement 
£’000 % £’000
Legal & Governance Services Under spend (156) (3.5) -
Finance Over spend 43 3.3 -
Human Resources Under spend (12) (2.6) -
IT & Revenues & Benefits Under spend (157) (1.6) -
TOTAL Under spend (282) 1.0 - 
5.18 In Legal & Governance, there is a projected under spend / additional income
of £156,000 which is primarily a result of additional staff slippage. 
5.19 Within Finance there is a projected over spend of £43,000 due to increased
external audit fees. 
5.20 In Human Resources there is a projected under spend of £12,000, due in the
main to staff slippage.

Page 5

5.21 In Information Technology and Revenues & Benefits there is a projected
under spend of £157,000, due primarily to the latest estimates on housing
benefit subsidy. 
5.22 Whilst the budget is on target across Property, there is a projected under
spend on energy and Pullar House which is contributing to additional
maintenance activity.   
Chief Executive Service
5.23 The projected outturn for the Chief Executive’s Service is currently anticipated
to be £19,000 less than budget due to staff slippage and additional income. 
6. REVENUE MONITORING – CORPORATE BUDGETS 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Health & Social care 
6.2 The Health & Social Care Partnership will report its first financial monitoring
for Perth & Kinross Integration Joint Board (IJB), for the financial year
2023/24, to the IJB’s Audit & Performance Committee on 18 September 2023. 
6.3 In setting the 2023/24 final Revenue Budget, the IJB approved the use of
Reserves to deliver a balanced position.  However, the financial position of the
IJB remains challenging due to health and social care continuing to face
recruitment challenges, increasing needs and complexities, uncertainty over
funding and rising costs particularly within prescribing. 
6.4 Any financial implications arising from the IJB will be reported to future
meetings of the Finance & Resources Committee. 
6.5 In relation to non-devolved functions there is currently a projected under
spend of £31,000 which is reflected in Appendix 1.   
Council Tax Reduction Scheme 
6.6 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.7 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements.  The following graph sets out both
variables over the current and previous six financial years.  The graph shows
a clear increase in the average weekly entitlement whereas the average
caseload has been more volatile but has returned to higher levels.

Page 6

6.8 In the current financial year, the Council is supporting approximately 8,500
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.65 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £1.2 million
which is reflected in Appendix 1. 
7. REVENUE MONITORING – FUNDING 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 July 2023 together with
prior year comparative figures for the previous five financial years.

Page 7

7.4 Between 2018/19 and 2022/23, the average collection figure to 31 August
was 46%.  The actual collection figure to 31 August 2023 was 46.17% which
is an increase of 0.17% compared to the five-year average, but a 0.08%
reduction on the comparable position in 2022. 
7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions.

Page 8

7.6 Given the 2023/24 collection rate that is set out at paragraph 7.4 above is
consistent with previous years, and that the growth in the number of Band D
equivalent properties is in line with expectations, it is currently anticipated that
Council Tax income is on target for the current year. 
Non-Domestic Rates 
7.7 The actual collection rate to 31July 2023 was 22.89%, compared to 24.06%
for the same period in 2022/23. 
8. REVENUE MONITORING – OTHER UPDATES 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 To date, no significant financial issues have been identified relating to Culture
Perth and Kinross or Perth Theatre & Concert Hall. 
8.3 Live Active Leisure finished 2022/23 with a revenue deficit of £203,000. For
2023/24, LAL has a budgeted deficit of £630,000, which it expects to rise to
£1.3 million in 2024/25. For 2023/24, LAL are funding the budgeted deficit
from their Reserves and at this stage, there is no ask of the Council. 
8.4 LAL’s projected deficits in 2021/22 and 2022/23 did not materialise, which is
positive. However, Council officers will work with LAL throughout the year on
best/worst/mid-range projections to ensure that the Committee has more
certainty about the likely year end position for 2023/24. This will be particularly
important to support work on the ALEO budget positions and SLA awards for
2024/25 given the continuing financial challenges which face the Council.

Page 9

8.5 As part of the ALEO Transformation Review, Glasgow Audit will be
commissioned to review the financial resource position of each ALEO and
provide some analysis and commentary on financial sustainability and
governance. 
8.6 The long-term sustainability if the Council’s ALEOs across future financial
years will be kept under review with updates provided to future meetings of
the Finance & Resources Committee. 
Tayside Contracts 
8.7 The operating environment for Tayside Contracts remains challenging.  They
continue to experience significant inflationary pressures on the price of staple
foods – beyond that of the headline CPI and RPI rates quote more widely.   
8.8 Beyond that, negotiations on the 2023/24 pay award are still ongoing.  Should
the outcome of the negotiations exceed budgeted levels, without sufficient
external funding forthcoming, there is a risk that this will cause a further
significant risk to the profitability of Tayside Contracts. 
8.9 Tayside Contracts are in the process of identifying mitigating actions and the
three constituent Councils are looking at how they may assist.  Work will
continue between officers of the Council and Tayside Contracts to further
refine these projections. 
8.10 Both of these pressures may impact on the Council in the form of a request
for additional financial support, as has been the case in previous financial
years and / or the non-achievement of the budgeted income from the share of
Tayside Contract’s surplus. 
8.11 At this stage, the potential costs of providing additional financial support have
not been factored into the Council’s projections.  Any proposal to provide
additional funding to Tayside Contracts will be brought back to a future
meeting of the Finance & Resource Committee for approval by elected
members. 
8.12 In addition, given the financial challenges facing Tayside Contracts, there is a
risk that the budgeted amount from the Trading Operations surplus of
£550,000 will not be received in the current year. 
Housing Revenue Account 
8.13 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 3. 
8.14 Across the Housing Revenue Account activity there is a net projected under
spend of £110,000.  This is made up of additional income from Interest on

Page 10

Revenue Balances and Recharges which is partially offset by IT system
upgrades and expenditure on decant costs. 
8.15 As a result of the variances identified above Capital from Current Revenue will
increase by £110,000. 
9. ISSUES ARISING FROM FINANCIAL YEAR 2022/23 
9.1 In completing the 2022/23 Unaudited Annual Accounts, two issues have been
identified which require adjustments to be made to the 2023/24 Management
Budget. 
Devolved School Management / Pupil Equity Fund Balances 
9.2 In setting the 2023/24 Final Revenue Budget on 1 March 2023 (Report No.
22/72 refers), the Council approved a projected Devolved School
Management (DSM) carry forward of £777,000.  However, the final under
spends (which included agreed planned carry forwards) on the DSM scheme
was £722,000 which is £55,000 less. 
9.3 Similarly, the Council approved a projected Pupil Equity Funding carry
forward of £300,000.  However, the final under spend was £140,000 which is
£160,000 less.  Schools spent 95% of their total Pupil Equity Funding in
2022/23, a significant improvement on previous years. 
9.4 ACTION: The Committee is requested to remove £215,000 from the
Education & Children’s Services to reflect the actual Devolved School
Management scheme and Pupil Equity Fund balances brought forward from
2022/23.  This adjustment is reflected in Appendix 1 (Column 3) to this report
and has no overall impact on the level of uncommitted Reserves. 
Revenue Grants 
9.5 Accounting arrangements under International Accounting Standards require
that, subject to certain conditions, revenue grants which were received by the
Council in 2022/23 but not utilised by 31 March 2023 should be accounted for
in Reserves at the end of the financial year.  Approval is therefore sought to
draw down £9.438 million in 2023/24 from the earmarked Reserve for
Revenue Grants.  These revenue grants are set out in detail in Appendix 4. 
9.6 Approval is now sought to adjust the budgets of Education & Children’s
Services (£1.639 million), Communities (£7.744 million) and Health & Social
Care (£55,000). 
9.7 ACTION: The Committee is asked to approve the adjustments totalling £9.438
million to the above Service budgets (set out in detail in Appendix 4), funded
from Reserves, to reflect revenue grants received in 2022/23 in respect of
expenditure which will not be incurred until 2023/24.  These additional

Page 11

adjustments are reflected in Appendix 1 (Column 3) to this report and have
no overall impact on the budgeted level of uncommitted Reserves.
10. 2023/24 ADDITIONAL FUNDING 
10.1 Since the 2023/24 Revenue Budget was updated on 26 April 2023 (Report
No. 23/120 refers), the Council has been advised of additional funding for the
current financial year from several sources.  To ensure that the 2023/24
Management Budget continues to reflect the operational requirements of the
Council, several adjustments are required, which are summarised below and
included in Appendix 1 and Appendix 5. 
Scottish Government – Revenue Support Grant: 
• Teachers Pay Award 2023/24: £4.068 million (Education & Children’s
Services (ECS)) 
• Additional Funding for Summer Holidays: £98,712 (ECS)
• No-One Left Behind – Approach to Employability: £322,000
(Communities) 
10.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £4.489 million will be made through a
redetermination of the Council’s Revenue Support Grant.  It is therefore
necessary to adjust budgets for Education & Children’s Services and
Revenue Support Grant. 
10.3 ACTION: The Council is asked to approve the adjustments set out at
paragraph 10.2 which is reflected in Appendix 1 (Column 4) to this report. 
Other Funding 
10.4 Other funding amounting to £4.856 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 5. 
10.5 ACTION: The Committee is asked to note the receipt of £4.856 million of
additional resources, with this funding being reflected within Education &
Children’s Services, Communities and Health & Social Care as additional
grant income.  The current projected outturn assumes that all these additional
resources will be fully expended in 2023/24 or will be carried forward under
the terms of the grant award. 
11. 2022/23 VIREMENTS 
Contribution to/from Capital Fund 
11.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on

Page 12

Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
11.2 The latest monitoring indicates a projected under spend on capital financing
costs (loan charges) of £130,000 based on the latest treasury management
activity and an increase of £633,000 in income from interest on revenue
balances due to rising rates.  This will result in an increased Contribution to
the Capital Fund of £763,000 in the current financial year. 
11.3 ACTION: The Committee is requested to approve the virement of £130,000
from the Capital Financing Costs (Loan Charges) Budget and £633,000 to
Interest on Revenue Balances with a corresponding increase in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 5) to this report. 
11.4 At 31 March 2023, the unaudited Annual Accounts included a Capital Fund
balance of £26.343 million.  The Capital Fund is currently projected to peak
in 2024/25 at approximately £31.6 million, before gradually reducing until fully
utilised in 2044/45. 
Service Virements
11.5 To ensure that the 2023/24 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 5) that have been
processed in line with the Scheme of Administration.   
12. 2023/24 MOVEMENTS IN RESERVES 
12.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves as at 31 March 2023 (per
unaudited Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2023/24, 2024/25 and 2025/26.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves.
12.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied. 
ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals.

Page 13

12.3 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration. 
Balances Held Under Statute / Regulation 
12.4 The application of these earmarked Reserves was considered earlier in this
report in Section 9. 
Balances Held for Specific (Previously Approved) Purposes 
12.5 Theses earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
The proposals listed below are simply about the transfers in and out of
earmarked Reserves to take forward approved proposals. 
• Contribution to 2023/24 Revenue Budget - £12,000
• Culture - £31,000
• Financial Insecurity - £30,000
• Works Maintenance (River Ericht) - £200,000
• Project Feasibility Fund - £115,000
• Working Smarter - £15,000
Balances Held for Other Purposes 
12.6 The Transformation & Workforce Management earmarked Reserve was
created to provide the funding required to take forward the Transformation
and Change Programme as well as fund the financial implications of
workforce changes. 
12.7 The 2023/24 Revenue Budget, approved by Council on 1 March 2023
included funding to take forward a number of anti-poverty initiatives.  This
funding will also support work in 2024/25, therefore approval is sought to
transfer £74,000 from the Chief Executive’s Service to the earmarked
Reserve. 
12.8 In addition, approval is sought to transfer £52,000 from the Transformation &
Workforce Management earmarked Reserve to ensure completion of several
previously approved projects including mental health training and low carbon. 
12.9 ACTION: The Committee is asked to approve the net transfer of £22,000 to
the Transformation & Earmarked Reserve with adjustments reflected in
Appendix 1 (Column 5) to the report. 
12.10 Furthermore, under the Framework for Managing Workforce Change, the
authority to approve voluntary severance requests sits with the Executive
Leadership Team, except for requests from Chief Officers.  With that in mind,

Page 14

approval is sought to draw down £178,000 from the Transformation and
Workforce Management earmarked Reserve to fund the voluntary severance
requests for seven officers across the Council.  These voluntary severance
requests will support the delivery of savings previously approved by Council
and payback in less than two years.   
12.11 ACTION: The Committee is asked to approve the transfer of £178,000 from
the Transformation & Earmarked Reserve with adjustments reflected in
Appendix 1 (Column 5) to the report. 
12.12 The Covid-19 earmarked Reserve is was originally created to address the
ongoing impact of the global pandemic.  Latterly it has supported initiatives
designed to mitigate against the cost of living. 
12.13 To that end, approval is sought to transfer funding to the Warm Welcome
Fund (formerly known as the Cost of Living Community Fund).  This funding
would be available for local community groups or organisations in Perth and
Kinross to apply for to provide activities and warm spaces for those struggling
with the cost of living over the winter months.  Groups are being encouraged
to work together to develop proposals which meet the needs of their local
communities.  To ensure that there are enough physical spaces and activities
to meet the needs of communities within every ward an additional £50,000 is
requested for the Warm Welcome Fund. 
12.14 ACTION: The Committee is asked to approve the transfer of £50,000 from the
Covid-19 earmarked Reserve to Communities for the Warm Welcome Fund. 
This adjustment is reflected in Appendix 1 (Column 5) to the report. 
12.15 Subject to approval of the proposals included within this report, the level of
earmarked Reserves will reduce to £30.361 million. 
12.16 When the implications of the revenue monitoring included within Appendix 1
are factored in, unearmarked Reserves reduce to £17.069 million (3.6%). 
Scottish Crannog Centre
12.17 On 1 February 2023, the Finance & Resources Committee agreed to
underwrite up to £210,000 of a contingency allowance for the Scottish
Crannog Centre (Report No. 23/30 refers). 
12.18 Following that decision, terms were confirmed with the project that this
funding would contribute to unforeseen necessary works, not additional works
or contract inflation. 
12.19 The works on the Scottish Crannog Centre are progressing with a planned
completion in Christmas 2023.  Currently additional costs are being forecast
for third party utilities connections, additional remedial works to existing
buildings, additional external works only visible once on site and clarifications
in specifications.   The Scottish Crannog Centre has subsequently requested

Page 15

an interim drawdown of £93,000 of the contingency funding from the Council.
Additional requests may be made before the contract completes. 
12.20 ACTION: The Committee is asked to approve the transfer of £93,000 from
unearmarked Reserves to Communities to support the Scottish Crannog
Centre.  This adjustment is reflected in Appendix 1. 
13. FINANCIAL RISKS 
13.1 In preparing the Council's 2023/24 Revenue Monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
13.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
13.3 Going forward, new risks will be captured within the body of the report with a
summary being maintained in Appendix 7.   
Budgeted Slippage on Teaching Posts 
13.4 Across all Council Services there is an approved staff slippage target of 4%. 
The ability to manage this target is limited in early learning and childcare and
school settings due to the requirement to fill all vacancies as they arise.    It is
also challenging due to the national requirement to maintain the teacher
number ratio.  Teaching slippage targets are currently not being met across all
school settings. 
13.5 As the financial year progresses, Education & Children’s Services will be able
to quantify the impact on delivery of the 2023/24 Revenue Budget.  If the
requirement to maintain the ratio is continued beyond the current financial
year, this will inevitably put further pressure on Revenue Budgets as well as
restrict where future savings may be drawn from. 
Services for Children, Young People and Families 
13.6 The 2023/24 Revenue Budget, agreed by Council on 1 March 2023 (Report
No. 23/72 refers) includes additional non-recurring funding of £1.952 million
for Services for Children, Young People & Families budget for 2023/24.  Had
this additional funding not been provided, the Services for Children, Young
People & Families would likely show a projected over spend of £2 million. 
13.7 The levels of need remain high following the impact of Covid-19.  Recruitment
and retention challenges have further exacerbated the situation. 
Notwithstanding the additional temporary staffing in place, there remains a
risk to future revenue Budgets.  Future budget projections do not allow for the
£380,000 of funding for the REACH team.

Page 16

Financial Insecurity Funding 
13.8 The Council has directed significant levels of non-recurring funding towards
the Scottish Welfare Fund and the Financial Insecurity Fund to support
vulnerable individuals and families with the cost-of-living pressures in recent
years. In addition, the Council has received external funding which it has also
directed to provide additional support. 
13.9 As things stand, this additional funding will not be available in 2024/25.  This
will likely result in the Council having to raise the priority rating for the Scottish
Welfare Fund to “high, most compelling”, which would be a first for Perth &
Kinross Council.  It may result in the provision of less dignified support during
times of crisis and push households in crisis to community groups that would
struggle to cope with the demand.  It may also cut across the ambition of
Cash-First. 
13.10 In the current financial year, the Scottish Welfare Fund and Financial
Insecurity Fund has had non-recurring additional funding of £600,000 and
£500,000 respectively applied to them. 
2023/24 Pay Awards 
13.11 The non-teaching pay awards for 2023/24 have not yet settled.  There is a risk
to both the current year, and future years that the final increases exceed both
the current budgetary provision and external funding made available by the
Scottish Government. 
13.12 Any shortfall could lead to further pressures on Reserves and / or cuts in
service delivery. 
Tayside Contracts 
13.13 There is a risk that the Council is required to provide additional funding for
Tayside Contracts to contribute towards higher inflation costs, reduced
demand for school meals and a pay award that exceeds budgeted levels. 
14. CONCLUSION 
14.1 Based on the June 2023 ledger, a projected over spend of £1.008 million has
been identified in the current financial year. 
14.2 This level of projected over spend will result in a reduction in the level of
unearmarked Reserves to £17.069 million or 3.6%. 
14.3 The financial position of the Council and its partners and ALEOs remains
challenging and regular updates will be provided to the Council and the
Finance & Resources Committee as the position develops.

Page 17

APPROVED 
Name  Designation Date
Stewart Mackenzie  Head of Finance 31 August 2023
Karen Donaldson  Chief Operating Officer 31 August 2023

Page 18

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial

Page 19

2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
2.4 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
2.5 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.

Page 20

4. Consultation 
Internal 
4.1 The Executive Leadership Team have been consulted in the preparation of
this report. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix 1 – 2023/24 Management Budget
• Appendix 2 – General Fund 2023/24 Projected Outturn – Service
Analysis
• Appendix 3 – Housing Revenue Account 2023/24 Projected Outturn
• Appendix 4 – Revenue Grants
• Appendix 5 – Other Fundings
• Appendix 6 – General Fund Balances
• Appendix 7 – Financial Risks