Perth and Kinross Council                                                       
Our vision is a Perth and Kinross where everyone can live life well, 
free from poverty and inequalities
________________________________________________________________________________________________________________________  
Committee or Board: Finance and Resources Committee  
Date:    20 June 2023 
Report Number:  23/195 
Report Title: PERTH & KINROSS COUNCIL, LEADERSHIP REVIEW
– NEW EXECUTIVE AND STRATEGIC LEADERSHIP
STRUCTURE  
Report Author:  Thomas Glen, Chief Executive – TGlen@pkc.gov.uk 
Organisational Lead: Thomas Glen, Chief Executive
___________________________________________________________________ 
1.   PURPOSE 
1.1 This report provides an update on the Council’s Leadership Review
transformation workstream which is a key element of the wider
Transformation and Change Strategy 2022/23 to 2027/28, Report No 22/142,
approved by Council in June 2022.  This report was the basis for the
presentation and briefing session to Elected Members on 16 June 2023, and
provides further detail as to progress in relation to the Leadership Review
transformation workstream. 
1.2 This report also sets out changes recommended by the Chief Executive to the
executive arrangements and strategic leadership team structure for the chief
officer roles.  Together with an outline of the process and timeline for the
management of these changes over the course of the current financial year. 
1.3 Finally, the report seeks approval on behalf of the Chief Executive, as the
Head of Paid Service, to take the steps necessary to formally implement the
revised strategic leadership structure. 
2.  RECOMMENDATIONS 
2.1 It is recommended that Finance and Resources Committee: 
• Notes the contents of this report which provides an update on the
Leadership Review transformation workstream;

Page 2

• Approves implementation of the new executive and strategic leadership
structure as set out by the Chief Executive; the associated processes
for the filling of posts; and consideration of any voluntary severance or
voluntary redundancy applications, as appropriate; 
• Agrees the convening of an Executive Sub-Committee of the Finance &
Resources Committee to consider applications for voluntary severance,
redundancy and any other potential costs associated with the changes,
as appropriate, recommended by the Chief Executive to assist in
enabling the implementation of the new strategic leadership structure; 
• Agrees the establishment of an Appointment Sub-Committee for the
recruitment of Director level posts within the new strategic leadership
structure; and 
• Notes that updates on this, and further phases of the Leadership
Review, will be reported to future Finance and Resources Committees,
in line with agreed reporting arrangements and will be supplemented
through Elected Member briefing notes and member briefing sessions. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
Section 4:  Background, Scope and Development of the Review
Section 5: New Executive and Strategic Leadership Structure
Section 6: Job Evaluation Outcomes and Pay and Grading Structure
Section 7:  Implementation of the review
Section 8: Risk and transition planning
Section 9: Conclusion
Appendices and Annexes 
4. BACKGROUND, SCOPE AND DEVELOPMENT OF THE REVIEW 
4.1 This section provides an overview of the Council’s leadership structure,
focusing on the chief officer roles.  This phase is the development of the
Leadership Review approved by Council in June 2022, including the overall
scope of the review. 
4.2 Since Perth & Kinross Council came into being in 1996, the needs of our
communities and the landscape in which local government operates have
increased in complexity.  As a result, the Council has required to evolve and
change both structurally and its leadership capacity to meet the needs of the
communities we serve.  This ensures it remains effective and fit for purpose.
In its earliest iteration following local government reorganisation in 1996, the
Council had 13 Director level posts, supported by 44 Heads of Service.  The
streamlining and reduction of leadership capacity has been an ongoing
process, whilst the complexity of the operating environment and the demands
on local government have continued to evolve.

Page 3

4.3 Since these early days the Council has implemented a number of workforce
and leadership reviews and restructures, and a Workforce Management
Strategy was developed in 2009.  At that time our workforce headcount was
6,281 with 28 Chief Officer posts.   
4.4 At the end of March 2023, the workforce headcount was 5,909 (which
represents a 6% reduction from the 2009 levels) with 20 Chief Officer posts,
including Chief Officer and Head of Service in the Health & Social Care
Partnership (which represents a 29% reduction in leadership capacity).  The
reduction to 20 posts includes the most recent removal of a Depute Director
post within Education and Children’s Services in 2023 as one of the early
actions from the current Leadership Review. 
4.5 The reduction in the capacity at strategic leadership level within the
organisation reflects an ongoing focus on efficiency, better integration of
service functions and the prioritisation of frontline services.  This will also
allow us to meet increasing demand with reducing resources.  It is
recognised, however, that any reduction in capacity adds pressure to those
continuing in leadership posts and a need to ensure support and consider
resourcing at other levels within the organisation. 
4.6 The continuing challenges facing local government today mean that we need
once again to review and refresh our operating model and leadership
structure to ensure they continue to be fit for purpose.  We must continue to
adapt and evolve to best meet the needs of the individuals, families and
communities that we serve and to provide the best possible and efficient
model of integrated service delivery.  To this end, the Council approved its
most recent Transformation and Change Strategy, Report No 22/142. 
4.7 The Transformation & Change Strategy, together with our Financial Strategy,
approved in June 2022 (Report No 22/141), our Medium-Term Financial Plan,
(Report No 22/249) approved by Council in September 2022, all align to
support the delivery of the Council’s ‘vision of a Perth and Kinross where
everyone can live life well, from poverty and inequalities’, and our defined
strategic priorities and key objectives set out in our new Corporate Plan
2022/23 – 2027/28 (Report No 22/311), approved by Council in December
2022. 
4.8 Within the approved Transformation and Change Strategy, the Council agreed
the development of a number of workstreams including the Leadership
Review, focused on improvement and service consolidation activities. 
Progress is being reported by way of regular updates to the Council’s Finance
& Resources Committee.   
4.9 Following approval, work on the Leadership Review commenced in the
autumn of 2022, led by the Chief Executive and supported by the Executive
Leadership Team (ELT).  This development work has been informed by a
programme of engagement with all Heads of Service, Managers and Team
Leaders through both the extended ELT, and the Leadership Forum.  There
has also been regular engagement with trade union colleagues, who have
confirmed that they have been consulted and do not object to the proposals
within the review.

Page 4

4.10 In addition to engagement with the officer leadership groups across the
Council, the development of the strategic leadership review and operating
model has been informed by a programme of ongoing employee
transformation engagement sessions, led by the Chief Executive.  These have
been conducted over the last year, involving around 700 employees.  Further
engagement with external stakeholders has also been carried out through a
programme of regular monthly meetings with community representatives from
communities across Perth and Kinross to seek their views on their
experiences of engagement with the Council and our services. 
4.11 Feedback from the internal staff team sessions has consistently highlighted
the positive leadership culture across much of the organisation, reflecting the
Council’s values of compassion, integrity and ambition.  Sessions have
also demonstrated the continuing commitment from our team to the delivery of
excellent public services and a focus on how we seek to best deliver for the
communities, families and individuals we serve. 
4.12 Internal feedback has also provided some challenge to the way in which we
operate, seeking to improve our culture, systems/processes, how we are
structured and how we engage.  Feedback has highlighted: that at times and
in some areas, we are seen to have a hierarchical culture in the organisation
that does not necessarily empower and make officers accountable for
decision making; perceived issues in terms the visibility of leaders and a need
for greater engagement; some elements of silo working between services and
a desire for improved communications and engagement by senior officers
across the Council. 
4.13 External feedback has overall been positive and also outlined many positive
experiences of Council services and members of our team when service
users have been able to access the best person in the organisation to provide
support.  However, feedback also highlighted challenges in sometimes finding
the right contact officer or routes into the organisation, as well as a lack of
joined up responses between services, which can result in delays. 
4.14 Based on the experience of the last 18 months of engagement and
observation by the Chief Executive across Council services, the feedback
from the engagement processes outlined above have informed the changes
outlined in this report. 
4.15 Consideration of the leadership structures operating across other Council
structures were also a factor in the scoping of the Leadership Review, though
it is noted that no two councils have identical structures, reflecting the
variations in size, location and communities they serve.   
4.16 As a result, the Leadership Review developed by the Chief Executive focuses
on four key areas, these being: 
• Leadership culture 
• Leadership engagement across the Council, with partners and
communities 
• Leadership and management competences and performance
• Leadership structures and capacity across the whole organisation

Page 5

4.17 The focus on these four areas was set out within the scope for the Leadership
Review signed off by the internal Transformation and Change Board.  A
programme of supporting activity is also being developed to support each
element of the review and within the rest of this section, brief comments are
offered on the first three elements before setting out the changes to
leadership structures in Section 5 of the report. 
Leadership Culture 
4.18 Fundamental to our success as an organisation is our focus on our purpose,
vision and values and ensuring that these are reflected in our behaviours. 
Our leaders are essential in modelling the behaviours we expect from them
and the rest of our team, and the success of this review will be built on
mainlining and growing our culture where individuals are valued and treated
with respect and where we maintain a continuing commitment to public
service and improvement. 
4.19 Across the Council there is an ongoing cultural engagement programme
which focuses on how our services support the Council values in the everyday
behaviour of our team members.  All leaders are encouraged to support this
programme and to demonstrate their commitment to our values and
behaviours in their everyday engagement with our team, partners and
communities. 
4.20 Over the last year we have introduced a regular monthly meeting of our
Extended Executive Leadership Team and a quarterly programme of
meetings for our wider leadership forum, involving service managers and
head teachers from across the organisation.  These focus on our
organisational culture, creating network and connections as well as shaping
and informing our policies and practice to deliver our seven corporate
priorities. 
4.21 The changes to our strategic leadership structure, set out in Section 5 of this
report, will require a continuing focus on organisational, including leadership
culture, and a programme of further development for our new Executive and
Strategic Leadership Team build on the new leadership competences
developed over the last year. 
Leadership engagement across the Council, with partners and
communities 
4.22 Reflecting the feedback from across our teams and from engagement with
partners and communities, the second theme within the scope of the review
focuses on leadership engagement both within and outwith our organisation. 
4.23 The experience of the Covid pandemic impacted on the Council’s visibility
within communities.  Whilst many frontline services operated throughout much
of the pandemic, others were required to develop alternative means of service
delivery and engagement with service users.  The period also impacted on the
levels of contact within and across teams inside the Council.

Page 6

4.24 Over the post pandemic period, leaders have been encouraged to spend
more time meeting in person with teams and to ensure their visibility at
services and locations across the Council and our communities. 
4.25 The last year has also seen a focus on greater visibility by senior leaders
within local communities.  This has included a programme of monthly
meetings with community representatives from the main settlements across
Perth and Kinross.  This programme of engagement will continue and we will
use these sessions to help inform our transformation workstream in relation to
community engagement and use wider feedback on improving services. 
Leadership and management competences and performance 
4.26 A new Leadership Competences Framework (the Framework) has been
developed following engagement with leadership teams and trade union
colleagues.  Work is underway to develop the associated performance
management arrangements. 
4.27 These leadership competences will be embedded into the role profiles and
person specifications for all leadership posts. 
4.28 The Framework focuses on the following five areas.  Against each,
behavioural indicators are being developed for use in performance reviews
and leadership development planning. 
o Personal Impact – A resilient and self-aware leader who demonstrates
the organisational core values, takes accountability, and achieves results
in a political environment. 
o Leads, Motivates and Inspires Others – Sets the tone, models and
enables a culture where individuals are solution focused and empowered
to ‘Think Yes’, ambitious in achieving improved outcomes for people and
communities and allowed to make appropriate decisions in their roles. 
o Improvement Focus – Values-led with a focus on continuous
improvement and change, transforming the way we think and work to
deliver better outcomes. 
o Empowers People and Places – Places people and our communities at
the heart of how we work, enhancing collaborative, trusting relationships,
building capacity for people to influence new ways of working. 
o Strategic Mindset (Risk/Conflict) – Creates the strategic direction and
priorities. Future focused with high awareness of external environmental
factors and potential impacts at local and national level. Prepares for,
recognises and responds to risk and recovery.  Welcomes challenge and
deals effectively with conflict. 
4.29 The Framework is currently being piloted across a number of service areas. 
The competences have been incorporated into the role profiles for all posts
within the new strategic leadership structure as set out in Section 5 of the
report.

Page 7

4.30 The use of the leadership competences will be rolled out within the new
strategic leadership structure over the coming year and further developed as
we work with all of those in leadership positions across the organisation. 
4.31 A new leadership performance framework will also be developed and rolled
out, focusing on contributions against Corporate Priorities and the delivery of
key outcomes and associated output by leaders and their teams. 
5. NEW EXECUTIVE AND STRATEGIC LEADERSHIP STRUCTURE 
5.1 The final element within scope of the Leadership Review considers our
leadership structure, and at this stage deals with our senior leadership team,
the roles within it and the capacity.  As noted in Section 4 of this report, the
Council has seen significant reduction in the size of its leadership team over
the past 25 years with increased integration of functions and activities being
led by those in the team.  This structure continues that trend. 
5.2 Again, as set out in section 4, the Council and local government as a whole,
have had to adapt and evolve continually to meet the changing needs of our
communities or legislative requirements.  To ensure that we are as effective
and efficient as possible and able to meet the challenges facing local
government, extensive work has been undertaken.  This includes the redesign
of our operating model and senior leadership structure.  This will allow us to
manage, maintain and deliver services, within a sustainable operating model. 
5.3 The leadership structure within the Health and Social Care Partnership is not
in scope for this strategic leadership review.  The Chief Officer for the Health
and Social Care Partnership, a joint NHST appointment in 2022, is currently
leading a review the leadership roles and structure within the partnership.
Proposals for a new integrated leadership structure will be brought forward to
the Integrated Joint Board over the coming months. 
5.4 Over the last year, feedback from internal engagement with colleagues from
across our organisation has included a focus on our organisational culture,
our systems and processes, our engagement and our structures. 
5.5 The Leadership Review has sought to respond to the feedback gathered from
internal and external engagement sessions by designing a structure which: 
• Facilitates more integrated service delivery
• Enhances leadership capacity and capability at multiple levels within
the organisation, ensuring that decisions are being made by those who
are best placed to make them 
5.6 Provides greater visibility and clarity in terms of responsible and
accountability.  The graphic below sets out the senior leadership structure
within the Council in May 2022 prior to the approval of the Leadership Review
in June 2022.

Page 8

No embedded text on this page.

Page 9

5.7 The first stage of the Leadership Review approved by Council in June 2022
(Report 22/142), saw the removal of the two Depute Director posts from the
structure, with the post of Depute Director – ECS deleted and the Depute
Director – Communities redesignated to take on the role of Executive Lead –
Transformation and Change and reporting to the Chief Executive. 
5.8 The Leadership Review and future operating model have been the subject of
engagement with the Council’s Executive Leadership and Extended Executive
Leadership Teams, as well as with trade union colleagues.  The initial
structure and service groupings were shared in February 2023 and further
refined through feedback.  They were then presented to those impacted by
the changes to the leadership structure, and their trade union representatives,
at the launch of a formal 21-day consultation period commencing on 22 May
and concluding on 12 June. 
5.9 During the consultation period, all individuals in scope and at potential risk of
redundancy attended formal consultation meetings with the Chief Executive,
supported by the Corporate HR Manager. 
5.10 The consultation process focused on a structured series of questions allowing
individuals to ask questions, offer comment and seek clarification around the
structure, the roles within the structure, the process of filling these roles and
the overall rationale for the review. 
5.11 Feedback from the consultation process has been considered in the finalising
of this report.  Trade union colleagues have confirmed that they have been
consulted and have raised no objection to the proposals. 
5.12 The report outlines changes in roles and service groupings at Executive
Leadership and Strategic Team levels within our organisation.  The proposals
will see reductions at both these levels. 
Executive Leadership Team and Roles 
5.13 The current Executive Leadership Team reporting to the Chief Executive
consists of five posts as detailed below: 
• Executive Director - Communities
• Executive Director - Education and Children’s Services
• Chief Operating Officer
• Chief Officer Health and Social Care
• Executive Lead - Strategic Planning and Transformation 
5.14 Within this element of the Leadership Review, the changes will see a
reduction in the number of posts from five to three which will be the current
post of Chief Officer, Health and Social Care Partnership as this is not
impacted by this review, and two new Director level posts, with revised
portfolios as set out at Graphic 1 below.

Page 10

No embedded text on this page.

Page 11

5.15 Each Director level post has a new portfolio of functions as detailed within
new role profiles and has been subject to independent job evaluation.  Each
Director will oversee a team of Strategic Leads as set out later in this section.
The Director level roles will: 
• work with the Chief Executive and Elected Members to develop and
implement the Council’s strategic direction;
• support and enable the Strategic Leads in their responsibilities for the
delivery of each of the Council’s Corporate Priorities and internal
organisational functions; 
• lead the ongoing change and transformation programme across the
Council; and
• oversee organisational service performance and improvement 
5.16 The first of the two Director level posts, Director of Economy, Place and
Learning, will have organisational leadership responsibility for a team of
Strategic Leads, responsible for an integrated model of frontline services
which are detailed at Graphic 2 and will include: 
• Education and Learning;
• Children, Families and Justice;
• Economy, Development and Planning;
• Environment and Infrastructure; and
• Housing and Communities 
The post also has the organisational lead for Tayside Contracts and Tay
Cities. 
5.17 The second of the two Director level posts, Director of Strategy, People and
Resources, will have organisational leadership responsibility for a team of
Strategic Leads, responsible for an integrated model of enabling
organisational services which are detailed at Graphic 2 and will include: 
• Finance and Business Support;
• Property Services;
• Legal and Governance Services;
• Customer and Digital Services;
• Strategic Planning, People and Performance; and
• Projects and Programmes (interim) 
The post also has the organisational lead for local resilience planning.
Strategic Leadership Roles  
5.18 There are currently 13 Heads of Service posts as shown below, who report to
the Executive Directors, Chief Operating Officer and Executive Lead.  They
are all part of the current Extended Executive Leadership Team (EELT).  This
list excludes the Health & Social Care Partnership chief officer roles and
jointly appointed roles with NHS Tayside, as explained in para 5.3 above; and
the senior service manager roles within finance, housing and HR who are also
part of the current EELT structure but are outwith the scope of this phase of
the Leadership Review. The 13 posts are:

Page 12

• Head of Finance
• Head of Legal and Governance
• Head of Property
• Head of Corporate IT and Revenues
• Head of Services for Children, Young People & Families
• Head of Education
• Head of Business Resources (Education and Children’s Services)
• Head of Culture and Communities
• Head of Innovation
• Head of Business Resources (Communities)
• Head of Environment and Consumer Services
• Head of Development and Planning
• Head of Housing 
5.19 The new strategic leadership structure will include 11 Strategic Lead posts,
including one interim post which represents a reduction of two posts from the
current 13. 
Graphic 2: 
5.20 A key change within the new leadership structure will be the scope, remit and
span of responsibility of the Director and Strategic Lead roles and the
relationship between them.  Directors will have expanded portfolios, requiring
less direct involvement in operational service areas.  The new Strategic Leads
will manage their operational areas, with some also designated to lead one of
the organisation’s Corporate Priorities.  Within their operational portfolios,
Strategic Leads will be expected to exercise greater leadership responsibility
in terms of decision-making and accountability.  For some this represents a
shift and challenge to the current culture where a significant amount of the
decision making is directed upwards and concentrated at Executive
Leadership Team level.

Page 13

5.21 The Strategic Leads will also be expected to demonstrate their abilities in
relation to the new leadership competences developed as part of this review
and to work within new performance framework arrangements for leaders
across the organisation. 
5.22 The success of the new operating model will be dependent upon developing
an organisational culture and governance framework which supports more
thematic, outcome focussed working across the organisation rather than a
service-based approach.  The operating model will build on the positives
currently identified within services and teams.  A focus will be on developing
the skills and relationships within the organisation to develop a one council
approach to integrated service delivery with people at its heart.   
5.23 These will be developed as we move through the recruitment process to fill
the Director and Strategic Lead posts, as set out in Section 7.  Once complete
there will also be a programme of team building and team development
focused on growing on the existing positive single team culture and a greater
emphasis on integrated cross service working. 
5.24 New role profiles have been developed for each of the Strategic Lead posts,
each of which has been the subject of an independent evaluation as set out in
Section 6 of this report. 
5.25 The main accountabilities for each of the Strategic Lead roles within the
structure is shown in the tables below and grouped for each Director portfolio
of services. 
5.26 Whilst the main strategy responsibilities will sit within the Strategy, People and
Resources portfolio, the Economy, Place and Learning Portfolio brings
together the main frontline services under one grouping with a focus on the
development and delivery of integrated locality-based services.  The strategic
responsibility for locality planning will sit with the Strategy, People and
Resources portfolio while implementation and delivery will sit with Economy,
Place and Learning.

Page 14

No embedded text on this page.

Page 15

5.27 The Strategy, People and Resources Portfolio brings together the main
enabling services under one grouping with a focus on the most efficient and
connected support to allow frontline services in delivering for communities.

Page 16

6 JOB EVALUATION OUTCOMES AND PAY AND GRADING STRUCTURE 
6.1 The current leadership review also allows implementation of the final phase of
the independent job evaluation scheme for chief officers.  Unlike other
occupational groupings, there is no nationally agreed job evaluation approach
for chief officer roles in Scottish Councils, with each Council developing its
own arrangements. 
6.2 Using the Hays Job Evaluation Method as an independent, transparent and
objective job evaluation exercise, provides Perth & Kinross Council with a
reliable and informed basis for determining chief officer salaries.  It also
provides an equal pay compliant scheme for chief officers, as other
occupational groups are already covered by their own job evaluation methods. 
6.3 It is important to note that the post of Chief Executive is excluded from this job
evaluation exercise on the basis that the salary level for chief executive posts
is determined nationally by the Scottish Joint Negotiating Committee (SJNC).
The Chief Executive salary scale has not been reviewed since 1999 and a
national review is underway.  The Chief Officer/Director and Chief Finance
Officer – Integrated Health & Care, are as previously indicated, also excluded
from this review – these are joint appointments with NHS Tayside and their
roles are not impacted by these changes.  A separate review of strategic
leadership roles in the Health & Social Care Partnership led by the Chief
Officer/Director is already underway to further support the integration of health
and social care services.  The outcomes of this exercise will be reported
separately to NHS Tayside and the Council, as appropriate, recognising that
postholders may be employed by either employing body. 
6.4 The independent review of the role profiles for the posts in the new strategic
leadership structure was undertaken by Korn Ferry, using the Hays Job
Evaluation Scheme.  This job evaluation approach looks at three factors -
Know How, Problem Solving and Accountability. 
6.5 The job evaluation exercise provided a ranking for posts using an objective
assessment of their respective size and shape.  It is for the Council to
determine job clusters and to apply an appropriate level of salary, which in
this case would be from the spinal column of salaries for chief officials as set
nationally by the SJNC. 
6.6 It is important to take account of salary benchmarking information to ensure
that salary levels remain competitive as an aid to retention and recruitment,
while also ensuring they are fair, equitable and affordable.  It is acknowledged
however that the salary levels applied in other Scottish Councils reflect a wide
range of local factors including their operating model, the extent to which the
council has externalised services, grouping of services, demographics, mix of
urban and rural communities, patterns of inequality, design of job roles, span
of control and levels within their organisational hierarchy. 
6.7 The salary grades for posts in the new strategic leadership structure are
detailed in the table below.

Page 17

Post
Korn Ferry
Benchmark
Salary Level
CO 
Grade
Salary level
(2023 pay award
not yet agreed)
Chief Executive
(For info only)
Level 25 Set by SJNC £145,789
Chief Officer/Director –
Integrated Health &
Care (For info only) 
Level 23  CO51  £127,786
Director – Economy,
Place & Learning  Level 23  CO51
£127,786
Director – Strategy,
People & Resources  Level 23  CO51
£127,786
Strategic Lead –
Education & Learning
and Chief Education
Officer 
Level 22  CO37  £99,469
Strategic Lead –
Children, Families and
Justice and Chief Social
Work Officer 
Level 22  CO37  £99,469
Strategic Lead –
Finance & Business
Support and Section 95
Officer 
Level 22  CO37  £99,469
Strategic Lead – Legal
& Governance and
Monitoring Officer  Level 22  CO37  £99,469
Strategic Lead –
Economy, Development
& Planning 
Level 22  CO37  £99,469
Strategic Lead –
Housing & Communities  Level 21  CO34  £93,413
Strategic Lead – 
Environment &
Infrastructure 
Level 21  CO34  £93,413
Strategic Lead –
Strategic Planning,
People & Performance 
Level 21  CO34  £93,413
Strategic Lead –
Customer & Digital
Services 
Level 21  CO34  £93,413
Strategic Lead –
Property Services  Level 21  CO34  £93,413
Interim Strategic Lead –
Projects and
Programmes 
Level 21  CO34  £93,413

Page 18

6.8 Excluding chief officer posts within the Health & Social Care Partnership, still
to be determined, the new strategic leadership structure will have 14 chief
officer posts compared with 18 chief officer posts in the current structure.
New Structure
WEF 1 April 2024 
Current
Structure 
Chief Executive  Chief Executive 
2 Directors  2@CO51 4 director level
posts
2@CO51 and
CO39/CO46 
10 Strategic Leads 5@CO37
5@CO34
13 Heads of
Service
CO38/2@CO36
and 10@CO34
1 Interim Strategic
Lead
CO34.  Up to 2
years  
14 posts  18 posts 
6.9 The vacant post of Depute Director – Education & Children’s Services has
already been removed from the revenue budget for 2023/24 (i.e. £138,000). 
The financial implications of this and the new strategic leadership structure,
set out above, is a recurring saving of £664,000 with effect from 2024/25. 
Subject to review, there will be a further saving of £125,000 per annum when
the Interim Strategic Lead role is removed from the new structure by April
2026.  Taken together and when fully implemented by 2026/27, strategic
leadership costs will have reduced by £789,000 per annum.  These are
estimated savings which take into account employer costs for national
insurance and pension contributions and assume a 3% uplift in 2022/23
salaries for this year’s pay award which is subject to national level negotiation
through Cosla.  
2023/24
£’000
2024/25
£’000
2025/26
£’000
2026/27
£’000
Annual Saving 138 664 664 789
Cumulative Saving 138 802 1,466 2,255
*Based on 2022/23 salaries plus a 3% pay award uplift for 2023/24.
6.10 By 2026/27, the reduction in strategic leadership costs detailed in this report
will result in cumulative savings of £2.255 million.  
6.11 A wider review of all leadership structures and capacity will take place once
the new strategic leadership team is in place.  This work will be informed by
the transformation and change projects and the new operating model, with
each Strategic Lead asked to undertake a review of their areas of
responsibility.  Further savings and efficiencies will be reported to Elected
Members through updates on the Transformation & Change Programme and
revenue budget monitoring.  It should be noted that some of these savings will
contribute towards savings which have already been agreed through setting
indicative budgets for the next two financial years.

Page 19

6.12 The Framework for Managing Workforce Changes will be applied in the
implementation of the revised leadership structure.  This could result in non-
recurring severance and or redundancy costs.  The Executive Sub-Committee
of Finance & Resources Committee will be asked to agree to meet any costs
associated with the implementation of the new leadership structure. 
7 IMPLEMENTATION OF THE REVIEW 
7.1 Whilst work on the implementation of the other three elements within the
scope of the review; culture & behaviour, engagement, competences and
performance is ongoing, the structural element of the leadership review is
more evolved, having been developed over the past eight months.  Its shape
has been informed by consultation with members of EELT and trade union
representatives, as well as wider engagement with colleagues across the
Council.   
7.2 The engagement process concluded in early May of this year and moved into
a formal consultation process from the 22nd of May until the 12th of June.  This
consultation included all members of the current Executive and Executive
Leadership Teams who are in scope and potentially at risk of redundancy as a
result of the changes in structures and roles. 
7.3 The staff in scope and SJC trade unions were invited to provide their
comments on the rationale and drivers for change, structure, operating model,
role profiles and proposed process to populate the new leadership structure.
Individual consultation meetings were held with all staff in scope during the 3-
week formal consultation period.  Meetings with the unions were held both
prior to and at the commencement of formal consultation.  They attended the
presentation on 22 May 2023.  All staff and unions were encouraged to submit
any questions or comments in writing.  All documents were shared through a
Sharepoint site.  Based on feedback minor changes have been made.  The
trade unions have not raised any formal objection to any of the proposals set
out in the formal consultation process. 
7.4 It is proposed to fill posts within the new leadership structure using ring-
fenced recruitment.  This method of filling will allow a fair selection process to
be undertaken to allow consideration of the changes being introduced.  As
detailed earlier, the roles of Director are new and the Strategic Lead roles are
new and/or significantly different resulting in different reporting relationships
between these levels.  This process further provides an opportunity to
consider the incorporation of new leadership competences that post holders
will be expected to demonstrate in future.  The ring fencing of posts at
Director level will apply to the current members of the Executive Leadership
Team.  At Strategic Lead levels, it will apply to the members of the Extended
Executive Leadership Team that are in scope.  This process is in line with the
Council’s current Framework for Managing Workforce Changes.

Page 20

7.5 Prior to filling these posts as outlined in para 7.4 above and reflecting the
reduction in the number of posts at both tiers of leadership, the Chief
Executive seeks approval to invite and consider applications for voluntary
severance.  This will enable implementation of these changes prior to the
recruitment process commencing.  This is in accordance with the Council’s
approved Framework for Managing Workforce Changes and will be for those
in scope.  Should any applications be received, the Chief Executive will
consider the business rationale, financial and organisational benefits of any
such application.  If these support voluntary severance these will be submitted
to a future Finance & Resources Sub-Committee for consideration by Council. 
A provisional date of 24 July is being proposed for consideration of any
applications. 
7.6 Following agreement on any applications for voluntary severance the process
of recruitment to the two Director roles will commence in August.  Recruitment
to these posts will initially be ringfenced to current members of the Executive
Leadership Team.  These Director posts will be recruited in line with the
Council’s Scheme of Administration through an Appointment Sub-committee. 
7.7 Thereafter, the Chief Executive and newly appointed Directors and Chief
Officer Health and Social Care will be involved in the recruitment to the new
Strategic Lead roles.  The recruitment will also involve senior Elected Member
involvement. 
7.8 As with the Director posts, recruitment to the Strategic Lead roles will be ring
fenced to members of the current Extended Executive Leadership Team who
are in scope and potentially at risk of redundancy.  In the case of four of the
Strategic Lead posts there will be a further ringfencing to reflect the need for
specific qualifications to meet the requirements for these posts.  The four
posts for which there will be ringfenced recruitment based on qualifications
are; 
• Strategic Lead – Education & Learning / Chief Education Officer; 
• Strategic Lead – Children, Families & Justice / Chief Social Work
Officer;
• Strategic Lead – Finance & Business Support / Section 95 Officer; and
• Strategic Lead – Legal & Governance / Monitoring Officer 
7.9 The remaining seven posts will be open to all remaining members of the
Extended Executive Leadership Team. 
7.10 In the event of posts not being filled, they will be opened up to the Council’s
wider team and external recruitment.  This could impact timescales for filling
posts and transition planning arrangements. 
7.11 Meetings will be arranged with anyone in scope who is unsuccessful in
obtaining a post as part of the ring-fenced process.  This meeting will be held
in accordance with the Framework for Managing Workforce Changes to
confirm redundancy and agree the individual’s search criteria for securing
suitable alternative employment during their contractual notice period.

Page 21

7.12 The intention is to have the new leadership structure populated throughout the
current financial year.  Any team members who are supported through
voluntary severance will similarly be expected to leave the organisation by the
end of March 2024.  Over the same period, it is anticipated that a number of
other consolidation transformation workstreams will be implemented resulting
in alignment with the new leadership structure.  The exact timing of any
releases will be subject to operational requirements and the management of
the level of risk and transition arrangements required for the level of change
within the organisation. 
8 RISK AND TRANSITION PLANNING 
8.1 Any transformation and change of this nature has a disruptive impact on any
organisation and its staff, not just those directly impacted but the wider teams
and team structures. 
8.2 The leadership review and changes will cause disruption, create levels of
worry and uncertainty for some whilst may be seen by others as an
opportunity for improvement and new ways of working. 
8.3 These changes will also impact on the internal relationships between teams
and in what members can expect from new roles and accountabilities which
may have previously been held by officers for some time. 
8.4 To plan and prepare for the implications of such a change, a programme of
communication is under development and will be rolled out across the
organisation. 
8.5 Additionally, the Executive Leadership Team is programming risk workshops
to undertake scenario planning, identify and mitigate any identified risks,
identify risk owners and mitigation strategies.  These will be incorporated into
finalised transition planning.  The risk plan arising from this will be iterative to
manage the process minimising the impact on service delivery as far as
reasonably practical.  Part of these workshops will identify critical approved
business processes and decisions that require to continue during this financial
year in parallel to the implementation process.  Some activities or projects
deemed to be non-critical may therefore be delayed or stopped to create
capacity to implement the new operating model and manage transfer and
transitions for all. In the unlikely event of any critical projects being impacted
this will be reported to Council as appropriate.   
8.6 Transition planning will assume the planned effective date of 1 April 2024 for
introduction of the new operating model, cultural and governance
arrangements.   
8.7 A more detailed transition plan will be developed to accommodate the various
components of the transformation and change including any staff movements,
training and development, team building, in addition to supporting those who
may leave the organisation. This will ensure business continuity, highlight any
evolving risks and prepare for sharing/transfer of knowledge to support the
migration to the new operating model.

Page 22

8.8 A communications and engagement plan to involve our employees, key
stakeholders, Elected Members and partners, as appropriate, will be
developed and managed for all stages of implementation.  The support and
co-operation of Elected Members and colleagues, as well as that of external
partners, will be critical in the successful management of the transformation
and transition to the new leadership structures. 
9 CONCLUSION 
9.1 The Leadership Review is a key element of the Council’s Transformation and
Change Strategy and sets out our ambitions to build on and deliver our vision,
in a way that reflects our values and allows us to continue to best serve the
needs of the people of Perth and Kinross. 
9.2 The review seeks to continue to grow the positive leadership culture that
exists within our organisation and to improve the integration of activities and
services across teams to best focus on delivery of our Corporate Priorities.  It
has, however, introduced a level of disruption into the organisation.  This will
require the management of the risks associated with such a change, as we
transition to the new leadership structures and wider operating model and the
changes which may result for individuals and teams across the Council. 
9.3 The review will deliver an ongoing annual revenue saving, as set out in
Section 8.  However, it is anticipated that implementation of the new strategic
leadership team structure will require one-off costs associated with any
applications for voluntary severance, redundancy or other potential costs
associated with the reduction in the number of posts.  An Executive Sub-
committee of the Finance & Resources Committee would consider any such
proposals made by the Chief Executive to facilitate the implementation the
new strategic leadership team structure. 
9.4 The Council is asked to consider the report and the recommendations therein,
remitting the Council’s Chief Executive to progress implementation of the
strategic leadership structure and the associated actions.

Page 23

Author(s)
Name Designation Contact Details
Thomas Glen  Chief Executive TGlen@pkc.gov.uk 
Approved
Name Designation Date
Thomas Glen  Chief Executive 15 June 2023   
Appendices 
• None included with this report.

Page 24

ANNEX  
1.  IMPLICATIONS, ASSESSMENTS, CONSULTATION, AND
COMMUNICATION 
Strategic Implications  Yes / None 
Community Plan / Single Outcome Agreement   Yes 
Corporate Plan   Yes 
Resource Implications    
Financial   Yes 
Workforce  Yes
Asset Management (land, property, IST)  None 
Assessments    
Equality Impact Assessment  None 
Strategic Environmental Assessment  None 
Sustainability (community, economic, environmental)  None 
Legal and Governance   None 
Risk  Yes
Consultation   
Internal   Yes
External   Yes 
Communication   
Communications Plan   Yes 
1.  Strategic Implications 
Community Plan  
1.1  The proposals will contribute to the Community Plan's aim of safe, healthy and
inclusive communities and the outcome of communities will have improved
quality of life.  The recommendations contained within this report are in
accordance with the priorities of Perth Common Good Fund's criteria for
financial assistance. 
Corporate Plan 
1.2 The proposals will contribute to the refreshed Corporate Plan 2022/23 to
2027/28 objectives and priorities of tackling poverty, tackling climate change
and supporting sustainable places, developing a resilient, stronger and
greener local economy, enabling our children and young people to achieve
their full potential, protecting and caring for our most vulnerable people,
supporting and promoting physical and mental wellbeing and working in
partnership with our communities where everyone can live life well, free from
poverty and inequalities.

Page 25

2.  Resource Implications 
Financial    
2.1  The financial implications are set out within the body of the report.   
Workforce 
2.3  The report details changes to the strategic leadership structure of the Council
and reduces the total number of Chief Officers by a total of five when the
interim role ends.  The proposals within the report are being managed through
the Framework for Managing Workforce Changes.  The impact of this
reduction and cost of change will depend on any voluntary severance
requests that have yet to be approved and/or any potential redundancy costs
arising following the recruitment and selection required to populate the new
leadership structure. 
2.4 The Corporate HR Manager and the Chief Accountant (Depute Section 95
Officer) have been consulted and have indicated agreement with the
proposals. 
Asset Management (land, property, IT) 
2.5 Not applicable. 
3.  Assessments 
Equality Impact Assessment   
3.1 Under the Equality Act 2010, the Council is required to eliminate 
discrimination, advance equality of opportunity, and foster good relations 
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 This section should reflect that the proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) with the following
outcome: Assessed as not relevant for the purposes of EqIA.   
Strategic Environmental Assessment 
3.3  The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4  However, no action is required as the Act does not apply to the matters
presented in this report. This is because the Committee are requested to note
the contents of the report only and the Committee are not being requested to
approve, adopt or agree to an action or to set the framework for future
decisions.

Page 26

Sustainability    
3.5  Not applicable. 
Legal and Governance 
3.6  Not applicable. 
Risk 
3.7  Risk management will be an integral part of managing the implementation of
the new leadership structure and transition to the new operating model.  As
outlined in the report workshops are planned for the Executive Leadership
Team to consider and mitigate the risks involved. 
4.  Consultation 
Internal 
4.1  All employees affected by the changes have been engaged in the new
operating model and formally consulted on the proposals in accordance with
the Framework for Managing Workforce Changes. The Corporate HR
Manager and Chief Accountant (Depute S95 officer) have been consulted on
the contents of the report. 
External    
4.2  The Trade Unions have been engaged and consulted on the proposals
outlined in the report including the proposed approach to filling posts and
have raised no objections.    
5.  Communication 
5.1  A communications and engagement plan has been developed to ensure
awareness across the Council and communities as appropriate.