Appendix 1 - Corporate & Democratic Services Annual Performance Report 2022/23

Perth and Kinross Council · 7 June 2023
Back to Finance and Resources Committee — 7 June 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Service APR
2022/23 
Appendix 1

Page 2

2 
Contents Page
Introduction     3
PART 1 - Service Annual Performance
Report 2022/23 
Performance Summary  4-22
Key Performance Indicators 23-27

Page 3

3 
INTRODUCTION   
Introduction 
Corporate and Democratic Services (CDS) provides the broad range of professional and technical knowledge, skills, and expertise to support
the Council and ensure that it does the right things, at the right time, in an open, fair and transparent way. This includes ensuring that the
Council acts lawfully and ethically and that our strategic resources are managed effectively. We maintain and provide assurance that our
corporate governance framework, (which includes our organisational culture, decision-making, resource management, policies, processes,
systems, and internal controls), is robust and effective, and supports the Council to achieve its strategic objectives to help make life better for
people across Perth and Kinross. We also deliver important front-line services, including the provision of vital advice and support in relation to
welfare rights, grants, benefits and local taxes, registration, licensing and information rights services, customer contact and complaints. 
We recognise that the environment in which we are operating is increasingly challenging; demand for services is increasing and needs are
becoming more complex, at a time when both the Council and individuals face increasing financial pressures. A key priority for CDS therefore is
to ensure that our financial, human, property, digital and information resources are optimised, aligned appropriately, and deliver best value; and
to provide the professional and technical support to enable the Council to change and transform services to better meet the needs of our
communities. 
Purpose 
This report provides an overview of the performance of CDS in relation to our defined priority areas for action and improvement, as set out in
our Business Management and Improvement Plan 2022-23. 
Our priority actions and improvements are grouped under the following headings: - 
• Getting the basics right: supporting and providing assurance in relation to corporate governance and the Council’s system of internal
control, strategic resource management, compliance, and accountability
• Developing people, skills, and capacity
• Exploiting digital opportunities and data insight
• Protecting our physical and information assets 
• Improving our customers’ experience
• Working smarter

Page 4

4 
CORPORATE & DEMOCRATIC
SERVICES  
ANNUAL PERFORMANCE REPORT
2022/23
SUMMARY 
Getting the Basics
Right  What we did  Impact/Learning
This means ensuring that
we support and maintain: 
❖ effective corporate
governance 
❖ robust system of internal
control
❖ effective strategic
resource management
and stewardship
❖ legal and regulatory
compliance
❖ open, fair, and
transparent decision-
making
❖ scrutiny and
accountability 
Corporate Governance Framework
➢ Assessed, evaluated, and provided assurance
as to the adequacy and effectiveness of the
Council’s governance and control
arrangements through the Annual Governance
Statement. 
Democratic Decision-making
➢ Supported transition, election, and induction of
a new Council.
➢ Developed and delivered a programme of
learning and development for Councillors.
➢ Implemented a new decision-making structure.
➢ Revised the Council’s Scheme of
Administration.
➢ Revised the Perth and Kinross Integration
Scheme for Health and Social Care.
➢ Implemented devolved decision-making pilot for
the Kinross-shire area. 
Kinross-shire Pilot
➢ Awaiting independent evaluation of the Kinross-shire
pilot to determine shape, scope and remit of model
for devolved decision-making. 
➢ Key challenge in designing a model which adds value
to communities and to the decision-making process.
Learning suggests that the structural model may need
further development, providing an opportunity to
review scope/remit/format/ membership, etc as we
explore options for devolved decision-making in three
further areas in 2024/25, as agreed by Council.

Page 5

5 
Financial Stewardship
➢ Statutory accounts for 2021-22 completed to
high standard with positive assessment from
external auditors.
➢ Developed a new Financial Strategy and
Principles to support effective decision-making.
➢ Implemented a robust programme of revenue
and capital monitoring.
➢ In partnership with Senior Leadership Team and
elected members, set balanced Revenue
Budget for 2023-24 and Provisional Revenue
Budgets for 2024-25 and 2025-26.
➢ Reviewed strategic investment decisions to set
Capital Budget for 2023/24 – 2027/28 
➢ Developed Medium Term Financial Plan for
2023-2029.
➢ Developed Service Concessions Strategy to
manage immediate budgetary pressures and
support the Council move to new models of
service delivery through the Transformation &
Change Programme.
➢ Exceeded expectations in relation to in-year
collection for both Council Tax and Non-
Domestic Rates with collection levels in 2022-23
anticipated to be amongst the highest in
Scotland.
➢ Planned and implemented significant update of
core financial systems with minimal disruption to
operations as a basis for improving future
system functionality. 
Budget Monitoring/Reporting
➢ In response to elected member feedback, have
revised format of Capital monitoring report to include
summary of progress on major projects.
➢ Due to the complexity of and the level of detail in
financial monitoring reports, they are viewed as
“impenetrable” to the average non technically
qualified reader. We will therefore review and revise
the format of Revenue & Capital monitoring reports to
focus more on strategic issues and exceptions
reporting. 
Budget Setting Process
➢ Re-established forward year budgeting at a detailed
level linked to the delivery of strategic priorities and
the identification of the first phase of Transformation
savings. Budget process, however, remains resource
intensive with known limitations in respect of data
analysis. 
➢ It is recognised that the budget preparation process is
particularly labour intensive for both officers and
elected members. Consultation exercise being
undertaken to identify opportunities to
improve/streamline the process. This will also link into
the Finance transformation workstream and through
the “big conversation” we aim to develop and improve
community engagement on the budget and Council
approach to participatory budgeting. 
Capital Investment
➢ Ongoing challenges in deliverability and affordability
recognised through review of elements of existing
programme.
➢ Ongoing review and update of scale of financial
challenge and risks.

Page 6

6 
➢ Acknowledgement of need to strengthen asset
management approach and reinvest in existing
assets.
➢ New Corporate Asset Management Plan to be
developed and submitted to Council in December to
strengthen evidence base for Council consideration of
long-term Investment Blueprint and funding strategy
in setting budget in February / March 2024.
➢ Development of roadmap for future financial systems
improvements together with business case for
investment. 
Medium Term financial planning
➢ Risk /challenge is the significant reliance on non-
recurring funding (common across Scottish
authorities) which underlines importance of adopting
a robust approach to implementing the Financial
Strategy and Principles.
➢ Service concession strategy provides additional
short-term funding to support Council services but
requires the reconfiguration and transformation of
service delivery to achieve long term financial
sustainability.
➢ Improved performance - In year collection at 31
March 2023: Council Tax 97.95% (+0.78% on
previous year); Non-Domestic Rates 97.91% (+3.62%
on previous year). Council Tax income c £200k more
than budget. Continue to review and monitor the
collection levels, payment behaviour and maximise
entitlement to statutory reductions.

Page 7

7 
Systems of Internal control
➢ Ensured implementation and provided
assurance as regards the effectiveness of the
organisational arrangements in place for: -
o the management of risk
o the processing of personal data
o cyber security & resilience
o access to public information
o complaints handling
o procurement compliance
➢ Secured continuing Public Sector Network
accreditation. 
➢ Developed and implemented policy and
procedural framework for the licensing of short
term lets in compliance with new statutory
requirements. 
➢ Continue to test, assess, review control measures in
each area to maintain and provide assurance as to
their effectiveness. 
➢ Annual Governance Statement and specific annual
reports provided assurance as to the effectiveness of
the arrangements in place in relation to Corporate
Complaints, Procurement, Cyber Security, Data
Protection Compliance, FOI, and Registrars 
Risk Management
➢ The Council procured a new performance and risk
management system which has provided the
opportunity to review and update the risk
management framework. This has highlighted the
need to develop the organisational risk appetite
profile to ensure that our risk management activity is
aligned to the achievement of the new corporate plan
objectives. 
Records Management
➢ Successfully developed a corporate electronic
document management system (EDMS) as part
of our compliance requirements under public
records management legislation. 
➢ Challenges relate to the sheer scale, diversity, and
complexity of the data which the organisation holds
and the multiple systems and various media in which
it is held. 
➢ The Council still holds several thousand storage
boxes of paper filles which require to be
digitised/archived/destroyed in accordance with the
Records Management Policy
➢ This element of a much wider organisational EDMS
programme has enabled services to move from
legacy shared drives and has ensured ready
availability of information from any device or location
where staff are working from and has helped to
improve information asset management.

Page 8

8 
➢ We will build on learning from Phase 1 to further
extend the work done on EDMS to Line of Business
Systems (LoB). The purpose of the wider programme
is not only to ensure legal compliance but also to
enhance the value of our data as a corporate
business asset to enable the Council to achieve its
desired strategic outcomes.

Page 9

9 
Developing People,
Skills and Capacity  What we did  Impact/Learning
Continue to work
proactively with all Services
to enable them to make
informed decisions about
their workforce
requirements to ensure they
are fit for the future. 
➢ Revised and updated the Workforce
Management Plan.
➢ Revised Framework for Managing Workforce
Changes.
➢ Vacancy & Post Management provisions
refreshed to mitigate impact of budget position. 
➢ Budget pressures continue to pose the greatest
challenge. 
➢ There are recruitment challenges in the areas of
health and social care. A targeted recruitment
campaign for social care role took place, the impact
of which was reported to the IJB and the situation
continues to be closely monitored. Competition for
certain professional and technical skills makes
recruitment and retention challenging. Growing our
own, improved advertising and promotion of
vacancies are among our approaches. 
➢ Given the changing nature of Local Government work
we need to ensure that we have the right skillset and
behaviours within the organisation. We will look to
nurture and develop talent by growing our own and
refreshing the MA/Graduate arrangement.
➢ The Corporate Workforce Plan 21-23 is being
refreshed to ensure that we can deliver the Corporate
Plan priorities, budget decisions, improve mobility,
retention and talent management and focus efforts on
delivering transformation and change.
➢ Changes to the Framework for Managing Workforce
Change to ensure it remained fit for purpose and
provisions were affordable and support improved
flexibility, adaptability and movement of staff across
the Council to facilitate change and transformation.
➢ We will continue to promote and apply the vacancy
and post management provisions to manage savings
in years 2 and 3 of budget.

Page 10

10 
Support the health and
wellbeing of our employees
as the organisation
continues to adapt and
incorporate the lessons of
the pandemic to ensure the
effective delivery of
services to the people of
Perth and Kinross. 
➢ Efforts are made to maintain health and wellbeing
across staff groups and teams, including: 
o Promotion and delivery of H&WB content
through a variety of mediums e.g., monthly
newsletter/slides.
o Employee Assistance Provision and the
Access to Mental Health Support Service
promoted via comms and invitation for
individuals, managers and/or teams to be
provided with a brief on the service and
wellbeing hub. 
o A wellbeing podcast series focused on a
range of related topics e.g., Drug and
Alcohol, mental wellbeing. Signposting to
PKC Scottish Mental Health First Aider
course for men.
o Promoted financial wellbeing hints and tips,
offered courses and events and sign-posted
to sources of support in payslips and via
other mediums.
o Signed up to the Menopause Workforce
Pledge which the Council is actively
supporting and informing employees affected
by the menopause. 
➢ Absence within CDS remains below the corporate
and national average for local government. HR meet
regularly with senior management to provide timely
and proactive support when staff are absent, and to
identify potential trends and hotspots.
➢ Risks are low in most CDS work settings however we
continuously review and/or refresh safe systems of
work and conduct generic risk assessments to ensure
that we are proactively managing health, safety and
wellbeing risks. 
Corporate Absence levels – see commentary in Key
Performance Indicators section 
Engage in the Equally Safe
at Work Programme (part of
the Scottish Government’s
strategy to eradicate
violence against women
and girls) 
➢ Council has signed up to the Development stage
of the Equally Safe at Work programme. 
➢ Undertaken a diversity survey to increase uptake of
disclosure around disability and ethnicity. Promotion
of information on Equally Safe to improve disclosure,
working with unions to support and sign-post staff.
➢ Promoted the 16 Days of Activism programme
organised by The Violence Against Women
Partnership.
➢ Working group has been developed to manage
actions.

Page 11

11 
Exploiting Digital
Opportunities and Data
Insight  What did we do  Impact/Learning
A fresh, fit for the future
Digital Strategy continues to
be developed, against the
backdrop of post-COVID
remobilization; the maturing
Perth & Kinross Offer and
the emerging
Transformation and Change
Programme. 
➢ Digital Perth and Kinross - Digital Strategy 2023-
2027 and Delivery Plan to 31 December 2024
approved by the Finance & Resources
Committee on 1 February 2023, and published.
➢ Digital Perth & Kinross being woven into the
Transformation & Change programme initiatives,
including Business Systems Review workstream.
➢ Elected Member Digital Champion appointed. 
➢ Strategy sets out principles and clearly articulates our
ambition for delivering positive sustained digital
change and better outcomes for our people and
places.
➢ Need to ensure that the Strategy is visible and
implemented consistently.
➢ Resource challenges: volume of work being
generated by Transformation and Change / Smarter
Working programmes requires to be managed
concurrently with Strategy Delivery Plan. 
Implement Mosaic as the
Council’s new social care
platform working towards a
potential go-live date in
September/October 2023. 
➢ The original suppliers Project Plan was reviewed
and a new “Go Live” date of Feb/Mar 2024 was
agreed between the supplier and PKC.
➢ Collaborated with the supplier and established a
detailed workplan to support an Agile delivery
model for implementation.
➢ Collaborated with all service areas in the design
and development of the new social care
workflows and forms that will be available on “Go
Live” within Mosaic.
➢ Commenced data migration testing from SWIFT
to Mosaic to validate the accurate and safe
transfer of all client data. 
➢ Commenced the development of the training
materials that will support the intensive training
period leading up to “Go Live”. 
➢ The impact of the adjusted timeframe has been
mitigated to ensure that the product is supported
during the first year after “Go Live”, and that during
that post “Go Live” period we can continue to
implement other key areas of the product such as the
Citizen and the Provider Portals.
➢ Agile working is enabling the services, the project
team and the supplier to work collaboratively in small
increments to rapidly design, evaluate, and test a
complex social care process to find the most
appropriate and effective way of carrying out that
process using all the features of Mosaic, before
moving on to the next one.
➢ Working collaboratively with services has ensured
that the social care processes are designed and
owned by the practitioners and are user-friendly,
streamlined, efficient, remove duplication and capture
all the key information.

Page 12

12 
➢ Data migration testing is ensuring the ongoing and
continuing support and safety of our service users on
the transfer from SWIFT to Mosaic at the moment of
“Go Live”.
➢ Critical to a competent and safe “Go Live” start for
Mosaic, and for our service users, it is essential that
all practitioners and users of Mosaic are familiarised
with the product and receive training in the use of the
new processes and workflows immediately prior to
“Go Live”. This timing will ensure there is no “skill
fade” experienced by users when they access the
new Mosaic system.
Move HR and Payroll
system ‘ResourceLink’ to a
cloud-based solution. This
is due to be migrated over
the summer of 2022. 
➢ This was not achieved within the anticipated
timeframe due to systems issues to be resolved
by the supplier and is now planned for June
2023. We continue to work with the provider to
ensure effective implementation.
➢ We have been testing the speed and functionality in
the background and will move over to the Cloud in
June 2023. This will create improved functionality
within the HR and Payroll system and facilitate
efficiencies. 
Use data analytics to build
the capacity and create the
capabilities necessary for
introducing new
technologies. 
➢ Developed a Strategic Data and Analytics
(D&A) Programme.
➢ Continued to progress implementation of a PKC
Data and Analytics platform.
➢ Data literacy training programme launched. 
➢ These tools are starting to be used effectively and
delivering benefit: -
o Enterprise business intelligence tools (PowerBI
and ArcGIS) now implemented and being used to
deliver reports/dashboards.
o PKC data warehouse capabilities continuing to
mature and corporate data platform implemented /
onboarding of data in progress.
➢ Going forward the focus needs to be on: -
o Governance and collaboration: continue to evolve
a holistic One Council D&A environment. 
o growing awareness of available tools to accelerate
adoption.

Page 13

13 
o building capacity: grow skills and expertise /
embed new operating model, aligned to
appropriate roles / business need. 
o demand management: embed approach for
prioritising run the business / change the business
demands on finite D&A programme resources.

Page 14

14 
Protecting our Physical
and Information Assets  What did we do  Impact/Learning
Property Assets  ➢ Property Services has full statutory and planned
preventative maintenance programmes in place
to provide safe and compliant accommodation to
staff, pupils and public across all buildings.
➢ In 22/23 maintenance arrangements in place
mitigated any material unplanned loss of service
due to building fabric or element failure.
➢ Property Services delivered £5m of reactive and
planned maintenance activities across the estate with
contractor partners including the main statutory
maintenance concerning gas, fire risk assessments,
electrical and asbestos systems.
➢ Given the financial pressures facing all local
authorities we have developed a Test of Change
project with Angus and Dundee Councils to identify
potential efficiencies and improvements via
collaborative procurement. 
➢ In 23/24 a Property Asset Management Strategy and
plan will be presented to Council for approval which
will help make better informed decisions in relation to
future investment. 
Influence and facilitate the
necessary changes in
practice to enable the
Council to achieve Scottish
Government targets of net
zero by 2045 and
intermediate reduction
targets. 
➢ The Council like other organisations and
individuals faced unprecedented increases in
energy costs due to the volatility of the global
energy market. Putting these increased energy
costs into perspective based on 21/22 levels, gas
and electricity increased by 231% and 61%
respectively for 22/23.
➢ To mitigate the impact of increased energy costs
and continue to work towards the Scottish
Government’s Net Zero targets it is essential the
Energy and Engineering team within Property
Services:
o Continue the good work undertaken in
previous years.
o Extend our commitment to increase energy
efficiency measures in accordance with the
PKC Climate Change Action Plan. 
➢ The building level interventions included upgrades to
Building Management Systems (BMS), rationalising
hot water systems, installing LED lighting, and
replacing inefficient heating equipment. 
➢ These measures have also been undertaken
alongside increased energy awareness to change
behaviours throughout the estate in conjunction with
building users and the Climate Change Team.
➢ All these actions have resulted in the following
reductions from 21/22 levels:
• Energy Consumption - 6000 MWh (12%)
• Carbon Emissions - 1325 TCo2e (14%)
• Costs - £500k (8%)
➢ As an example, some of the greatest reductions from
above were achieved in one of the IIL School
Campuses. Upgrading of the BMS system at this site
achieved cost reductions of £60k.

Page 15

15 
➢ Capital Investment of circa £500k is planned /
scheduled for 2023/24 and an additional £2m of
capital funding was added into the Council budget on
1 March 2023 for decarbonisation.
➢ Staff are concurrently working up the detail behind
the Climate Change Strategy Action Plan to move
towards decarbonising the estate by 2045. 
The focus for 2022/23 is
managing the increasing
demand for maintenance
within available budgets. An
escalation in contract costs
tied to CPI (Consumer
Prices Index) combined
with national supply chain
difficulties with materials
and resource supply will
also bring significant
challenges. 
➢ Financial outturn is included in projections
provided to F&R Committee. Inflationary and
demand pressures have been recognised within
23/24 budgets. 
➢ Management of demand levels for maintenance are
reflective of the condition of the estate. These are
monitored monthly and material changes reported to
F&R Committee. 
➢ The property consolidation transformation review
should lead to a reduction in the cost of maintaining
the estate. 
➢ Proposals will be developed via the future Property
Asset Management Strategy and Plan and will
provide options for future years.
Information Assets 
Increase cyber security
talent pool to eliminate
single points of failure and
increase resilience
➢ Along with a member of the Records and
Information Security team, a new Graduate
Apprentice is undertaking a BSc in Cyber
Security at Napier University alongside their
operational role within the team. This is building
and developing greater in-house knowledge,
skills, and expertise. 
➢ Given that human error/action poses the greatest risk
within the organisation, the graduate apprentice role
will be developed to support all areas of Information
Security, but with a focus on user awareness,
passwords, and threat intelligence. 
Deliver Cyber tabletop
exercises to increase level
of cyber awareness and
increase resilience 
➢ Given the sensitive and diverse nature of the
information held within these services and
interaction with other systems, to date, exercises
have been undertaken within
o HR
o Legal & Governance
o Safer Communities 
o Live Active Leisure 
➢ Additional exercises are scheduled for other teams to
raise awareness and increase preparedness.
➢ Externally led exercise is scheduled for senior
leadership and the cyber incident response team.
➢ This ongoing programme of work will build on
experience with exercises and testing being rolled out
across the organisation and repeated as required.

Page 16

16 
Develop and Implement
Cyber Incident Response
Plan (CiRP)
➢ Cyber Incident Response Plan has been
developed, approved and is now being
implemented. 
➢ This plan has been tested through several tabletop
exercises. Sessions have been very well received
and are highly recommended by previous
participants. Teams have commended the
collaborative effort of Legal and Governance and the
IT Service in delivering Cyber sessions which cover
all areas not just the technical elements.
➢ Building on the tabletop exercises, the Plan will be
independently tested by external parties as part of a
leadership cyber exercise. 
Partner with external
specialists to implement a
managed 24/7 Cyber
Security Operations Centre
(SOC). 
➢ Cyber Security Operations Centre (CSOC) / 24/7
external monitoring in place and operating
effectively. 
➢ This significantly enhances our security capacity and
capabilities for early threat detection, containment,
response, and remediation. Therefore, we are better
equipped to manage/mitigate external risks to the
accessibility and integrity of our data which is key to
delivery of vital services and the achievement of the
Council’s aims and objectives. 
Ensure that our IT
infrastructure and networks
protect our systems with
up-to-date cybersecurity
measures and have PSN
(Public Service Network)
accreditation. 
➢ Achieved annual PSN accreditation.  The Council
must re-accredit to the PSN annually and provide
assurance that the Council network is well run
and presents no onward risk to central
government services.
➢ Phishing simulation tool being
implemented/onboarded.
➢ Cyber Security Response Plan and Team in
place.
➢ Phishing simulation exercises are resulting in greater
awareness and understanding (and a recognition) that
our own people pose the most likely cyber security
threat to our systems and data. By continuing with a
programme of training and testing we will continue to
reduce that risk.
➢ To mitigate against constantly evolving cyber threats,
there will always be a need to continually invest in and
improve our cyber defences.  Strategic plans for
securing and accessing our information assets
include: redesigning the Council’s IT network model to
deliver a fit for the future digital environment;
optimising current investment in cyber defences and
implementing enhanced security features.

Page 17

17 
Improving our
Customers’ Experience  What did we do  Impact/Learning
Contributed to key priorities
(Child Poverty, Economic
Wellbeing and Fairness and
Equality) 
➢ Welfare Rights Team achieved Benefit Gains
of £6.5m (£5.3m in 2021/22). Continued to
administer and review PKC’s Financial
Insecurity Fund; getting £567k of assistance
to those on low incomes (including assistance
with priority debt) and ensuring that the
scheme covers those with No Recourse to
Public Funds. 
➢ Created the Local Low Income Support
Payment which distributed £997k to 8235 low-
income households and care leavers. 
➢ Completed administration of Scottish
Government’s Cost of Living Awards and Self
Isolation Support Grants. Undertook delivery of
the UK Governments two latest Energy
Schemes. 
➢ Augmented Scottish Welfare Fund budget
which enabled better outcomes from
applications for Crisis Grants 
➢ Following successful inspection of Welfare
Rights (August 2022), retained accreditation at
the highest level in respect of benefit
representation at Courts and Tribunals. 
➢ Positive Customer Feedback – 100% satisfaction
(Welfare Rights) 
➢ Using financial assistance schemes are recognised
as a highly effective gateway to encourage contacts
with Welfare Rights, which enables us to maximise
statutory entitlements and identify other assistance
required by customers.
➢ Continue to ensure that people who need our help
can be identified at the earliest opportunity;
maximising use of data, ensure information we
provide is clear and easily accessible to all and
ensure that the public and frontline in all sectors are
aware of how to contact and refer to us. 
➢ This enables Welfare Rights to continue to advise
and represent our customers at court and tribunal
with regards to benefits at the highest standard.
➢ Continue to ensure that the necessary culture, plans,
and procedures are in place and continuous
improvement can be demonstrated. Also ensure that
the necessary knowledge and skills can be
demonstrated. This is required to meet the increasing
standards for retention of accreditation. 
Develop an ambitious
Customer Service Strategy. 
➢ Webchat rolled out across all Council web pages.
➢ This commitment links to the Transformation &
Change workstream on Customer Services.
➢ A new customer services strategy will optimise use
of digital transformation and ensure customer
insight and intelligence are used to develop and
improve customer standards and services. 
➢ Adding the webchat channel has had a positive impact  
on our customer services performance. 
➢ Continue to look at ways of improving end to end
digital service delivery. 
➢ Reviewing all our customer channels, looking for ways
to improve access to information and improve online
uptake.

Page 18

18 
➢ Pullar House opened for “walk ins” in October 2022
after operating an appointment only system during the
pandemic. The system for “walk ins” has been
operating in tandem with the more efficient and
effective appointment system also being offered to
customers.
➢ Customer numbers and reasons for in-person visits
at both Pullar House and 2 High Street receptions are
being monitored to inform future strategy. 
Continue to promote digital
channels and make sure no
citizen is excluded. 
➢ New high-volume processes designed,
developed, and implemented:
o General Enquiries (Redesign).
o EAP Change of Circumstances (staffing
changes)
o Short Term Lets Licences.
o Green Recovery Capital Grant Enhancement
Package.
➢ Gold Silver and Bronze prioritisation model now
being used by Digital Board to endorse priority
Online Services work packages for the next
period.
➢ External Digital Participation Research Report
commissioned, resulting in Digital Participation
Action Plan for Perth and Kinross. 
➢ 122 customer facing online processes have been
developed (96 of which are active).
➢ 27 internal online processes have been developed
(20 of which are active).
➢ 24/7, 365 days per annum availability to our citizens,
relieving the pressure on other channels (F2F and
telephone) for those who do not or cannot engage
with us digitally. 
➢ Continue “One Council” development of the corporate
mobile working and online service platforms. 
Investigate opportunities for
new and emerging
technologies including
webchat to improve service
operation and design. 
➢ Microsoft ChatBot being piloted with HR as part
of the Digital Employee Experience Programme.
➢ PKC use of Microsoft Power Apps pioneered to
create / publish an “always available” Offline
Working Guide for staff. 
➢ Sensors being deployed across our Social Housing
estate to proactively monitor property condition to
better allocate resources to support tenants and avoid
costly repairs.
➢ Initial HR ChatBot pilot is generating significant
Service interest.  Future priorities/use cases will
require to be identified, to optimise value from our
investment in this technology.

Page 19

19 
➢ Internet of Things (IoT) pilots under way as proof
of concept for implementation of an enterprise
IoT platform, which encompasses multi-
disciplinary deployment of sensors linked in with
corporate platforms such as Building
Management, Data Warehouse and Mobile
Working platform. 
➢ Opportunities for exploring the Microsoft
PowerPlatform tools in which we already invest need
to be investigated to avoid investment in alternative
third-party products.

Page 20

20 
Working Smarter  What did we do Impact/Learning
Undertaken council wide
engagement to review
workspace requirements
based on how we are using
hybrid working to determine
overall space requirements
and consider the need for
quiet spaces, collaboration
spaces, bookable rooms
with and without hybrid
meeting equipment. 
➢ Working Smarter Project Scope approved by the
Transformation & Change Board.
➢ 18 rooms available with hybrid meeting facilities
(16 available in central Perth offices and two in
secondary schools). 
➢ Hybrid working continues to operate successfully
across teams throughout PKC.
➢ Flexible Working Framework developed for hybrid
and remote working.
➢ Guidance for managers and staff continues to be
updated and promoted to reflect best use of how,
where and when we work.
➢ A project team has been established that will deliver
an action plan to take working smarter forward,
reviewing, and optimising use of Perth office
accommodation, and exploring options for One Public
Estate.
➢ Programme for rollout of hybrid meeting equipment to
other work locations across Perth and Kinross. 
Work to digitise paper
records for services to
ensure that they are
available to the right people
at the right time to support
effective remote and hybrid
working. 
➢ Engaged in a large-scale operation to digitise
records for a number of services. 
➢ Information is more readily available and accessible
and supports effective remote and hybrid working.
➢ This will contribute towards a reduction in physical
storage requirements whilst improving the Council’s
understanding of what data it holds.
➢ This is an extensive, ongoing programme of work.
Transformation & Change –
Finance Review.
➢ Project scope agreed.
➢ Engagement with finance teams across the
Council
➢ Reviewed current operational finance structures
across the organisation to develop options to
consolidate teams, review systems, streamline
processes and improve efficiency. 
➢ New service delivery model will be developed based
on bringing all finance teams together and business
partnering principles.

Page 21

21 
Transformation & Change – 
Redesign of Strategic
Procurement and
Commissioning function. 
➢ Extensive programme of initial engagement with
internal stakeholders.
➢ Project Scope established.
➢ Data analytics work underway.
➢ Regular consultation and engagement sessions
scheduled.
➢ Small scale test of change pilots underway in
relation to certain supplies. 
➢ Taking time to meet 1-1 with key stakeholders at the
start of the project has ensured buy-in and closer
collaboration across the organisation.
➢ Data is extensive and dispersed across different
services but is failing to provide the necessary
business intelligence to help drive savings and
efficiencies. Data analysis exercise is underway to
inform next steps.
➢ In response to the stakeholder engagement, a new
procurement and commissioning strategy will be
developed, test of change pilots will be evaluated and
the development of integrated purchase to pay
functionality will be further explored. 
Transformation & Change- 
Human Resources and
Organisational
Development. 
➢ Project Scope agreed.
➢ Options appraisal developed.
➢ Engagement sessions with key stakeholders held in-
person and online. Survey issued to inform the
options appraisal.
➢ Systems mapping and benchmarking undertaken to
inform future operating model of a consolidated HR
and OD function.
➢ Further work required for Learning & Development
options. 
Transformation & Change –
Property function
consolidation. 
➢ Project Scope agreed.
➢ Options appraisal developed.
➢ Engagement sessions with all staff held in person in
late 2022.
➢ New corporate landlord model of service delivery
which brings together all property teams is being
developed.
➢ Work is ongoing to develop a consolidated
programme for all property activities, including
general fund and Housing Revenue Account new
build, to ensure corporate prioritisation and delivery
resources are aligned.
➢ Corporate Property Asset Management Strategy and
Plan is being drafted.

Page 22

22 
Transformation & Change –
Customer Services.
➢ Project scope agreed.
➢ High level option appraisal for Customer Services
transformation developed. 
➢ There is genuine cross-Council appetite to streamline,
modernise and standardise our approach to customer
service delivery. 
➢ Engagement with our customers, businesses, and
elected members.
➢ Continue to work collectively across teams to develop
plans to deliver on new 2 hub model for Customer
Services. 
➢ Ensure digital transformation within customer services,
making best use of customer data, building capacity
and capability with a view to improving customer
service.

Page 23

23 
KEY PERFORMANCE INDICATORS 
Financial Management   
Indicator
Performance Target Trend
2020/21 2021/22 2022/23 2022/23 
Percentage of income due from council
tax received by the end of the year  96.6% 97.7% 98.4% 97.5% 
Comments on performance during 2022/23 and target:
Despite the significant ongoing financial challenges facing many households, the level of Council Tax collected during 2022/23
exceeded all expectations.  A joined-up approach, with focus on maximising income for the Council, and also identifying
customers who require assistance and providing targeted help/advice, has been key to this success.  The Revenues and
Benefits Service constantly review and improve its practices to ensure that they are fit for purpose and that continual
improvement takes place. 
Percentage of invoices sampled that
were paid within 30 days  89.7% 94.0% 93.7% 94% 
Comments on performance during 2022/23 and target:
Payment performance has returned to pre covid-19 levels with the target for 2022/23 almost achieved. 
Support services as a percentage of
total gross expenditure  3.8% 3.7% TBC 3.7%
Not
available
Comments on performance during 2022/23 and target:
2022/23 information not available until publication of Improvement Service data later in 2023.

Page 24

24 
Staffing   
Indicator
Performance Target Trend
2020/21 2021/22 2022/23 2022/23 
Sickness absence for employees (non teaching) – average
number of days 8.3 10.9 13.0
No target –
intention is
to manage
and mitigate
absences

Comments on performance during 2022/23 and target:
Sickness absence for employees (non-teaching) has increased by 2.1 days. Short term sickness has increased by 3.93%,
medium term sickness has increased by 0.83% and long-term sickness has reduced by 4.83%. 
A return to pre-Covid recording methodology along with wider societal increase in ill health figures has contributed to this
increase. The HR team continue to provide detailed analysis of sickness information to explore information by absence reasons,
numbers of occasions and days lost. More detailed work is required to determine if there are any trends or patterns for the
increase in short term sickness. The data is monitored by service managers on a regular basis.  
Learning opportunities and support continue to be offered to managers with monthly wellbeing slides shared. We are intending to
promote new tools to improve accessibility of information in 23/24. A suite of guidance with signposting to support with an
increased focus on financial wellbeing due to the increase in cost of living has been developed.  The recent launch of a new
Employee Assistance Programme and proactive wellbeing platform will also support.

Page 25

25 
Staffing   
Indicator
Performance Target Trend
2020/21 2021/22 2022/23 2022/23 
Sickness absence for teachers – average number of days
4.2 7.0 8.9
No target –
intention is to
manage and
mitigate
absences 

Comments on performance during 2022/23 and target:
Sickness absence for teachers has increased by 1.9 days. Short term sickness has increased by 3.23% medium term sickness
has reduced by 1.8% and long-term sickness by 1.43%. 
As noted above the increases are due in part to a return to pre-Covid recording methodology but also reflective of the wider
societal increase in ill health figures. The HR team continue to provide detailed analysis of sickness information to explore
information by absence reasons, numbers of occasions and days lost. More detailed work is required to determine if there are any
trends or patterns for the increase in short term sickness. The data and commentary on trends is monitored by Head Teachers on
a regular basis and regular updates on trends and hotspots shared at Headteacher meetings.  Targeted action and support have
been provided by HR as appropriate. 
Learning opportunities and support continue to be offered to managers with monthly wellbeing slides shared. We are intending to
promote new tools to improve accessibility of information in 23/24. A suite of guidance with signposting to support with an
increased focus on financial wellbeing due to the increase in cost of living has been developed.  The recent launch of a new
Employee Assistance Programme and proactive wellbeing platform will also support.

Page 26

26 
Staffing   
Indicator
Performance Target Trend
2020/21 2021/22 2022/23 2022/23 
Gender Pay Gap  -1.2 -1.1 -2.35%
To be as
close to
balanced as
possible

Comments on performance during 2022/23 and target:
The figure calculated using the average base hourly rate for males and females indicates a widening pay gap in favour of
females. The median gap is sitting at 0%.
We ensure a consistent application of salary on appointment and progression rules which are designed to support a fair and
consistent base pay environment. The slightly increasing gap is influenced by the higher pay settlements received by colleagues
in lower grades (reducing the gap between them and those in the next grade) many of whom are women in caring/pupil support
roles and augmented by the increase in the proportion of women in the higher earners as noted below. 
Proportion of the highest paid 5% employees who are
women 53.8% 54.0% 55.9%
No target is
set  
Comments on performance during 2022/23 and target:
There is an increase in the top 5% of earner from 226 to 229 and an increase in the total number of female staff in the top 5%
up from 122 to 128.   
The figure continues to increase based on recent pay awards and established good recruitment practice with improved personal
and career development opportunities. It may also have been influenced by increased flexibility in working hours and
attendance. It does not yet reflect the overall workforce distribution between men and women (women = 73% of the workforce).  
Going forward the introduction of the Leadership Competency Framework and associated development activity will provide
further support for staff to develop their careers and investigation into a specific mentoring/development programme for women
is taking place.

Page 27

27 
Asset Management   
Indicator
Performance Target Trend
2020/21 2021/22 2022/23 2022/23 
Proportion of operational buildings that are suitable for
their current use  90.9% 93.4% 96.15% 95% 
Comments on performance during 2022/23 and target:
Additional data regarding Public Conveniences and depot sites added to scoring of suitability. Investment by Education and
Children services on Perth Academy (£9m), Perth Grammar School (£5m), Letham PS (£5.3m) and Milnathort PS (£2.3m). 
Target for 2023/24 remains 96.15%, which is based on proposed planned investment at Riverside PS and Perth Museum,
disposal of Balhousie PS and North Muirton PS but these don’t have a major effect on suitability scoring. 
Percentage of internal floor area of operational
buildings in satisfactory condition  85.4% 89.8% 90.75% 90% 
Comments on performance during 2022/23 and target:
75% of GIFA of operational buildings for Condition surveys now complete. Investment on Perth Academy (£9m), Perth
Grammar School (£5m), Letham PS (£5.3m) and Milnathort PS (£2.3m). 
Target for 2023/24 is 91%, which is based on planned investment at Riverside PS and Perth Museum, disposal of Balhousie
PS and North Muirton PS. 