Democracy Spraffa

Agenda Document Pack - Finance and Resources Committee - 26/04/2023

Perth and Kinross Council · 26 April 2023
Back to Finance and Resources Committee — 26 April 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
19/04/2023 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 26 April 2023 at 14:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Stewart Donaldson  (Convener)
Councillor Grant Laing  (Vice-Convener)
Bailie Chris Ahern
Bailie Alasdair Bailey
Councillor Peter Barrett
Councillor Andy Chan
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor John Duff
Councillor Angus Forbes
Provost Xander McDade
Councillor Tom McEwan
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Page 1 of 102

Page 2

Page 2 of 102

Page 3

Finance and Resources Committee 
Wednesday, 26 April 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTES   
3(i)  MINUTE OF MEETING OF THE FINANCE AND RESOURCES
COMMITTEE OF 1 FEBRUARY 2023 FOR APPROVAL
(copy herewith) 
5 - 8 
3(ii)  MINUTE OF MEETING OF THE EXECUTIVE SUB-COMMITTEE
OF THE FINANCE AND RESOURCES COMMITTEE OF 22
MARCH 2023 FOR APPROVAL
(copy herewith) 
9 - 10 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 23/119) 
11 - 12 
5 TRANSFORMATION AND CHANGE
Presentation by Executive Lead - Strategic Planning and
Transformation 
6 REVENUE BUDGET 2022/23 - UPDATE NO. 4
Report by Head of Finance (copy herewith 23/120) 
13 - 48 
7 COMPOSITE CAPITAL BUDGET 2022/28 & HOUSING
INVESTMENT PROGRAMME 2022/27 - MONITORING REPORT
NO. 4
Report by Head of Finance (copy herewith 23/121) 
49 - 82 
8 TREASURY ACTIVITY AND COMPLIANCE REPORT 2022/23
QUARTER 4
Report by Head of Finance (copy herewith 23/122) 
83 - 102 
Page 3 of 102

Page 4

Page 4 of 102

Page 5

FINANCE AND RESOURCES COMMITTEE 
Minute of hybrid meeting of the Finance and Resources Committee held in the
Council Chamber, 2 Hight Street, Perth on Wednesday 1 February 2023 at 2.00pm. 
Present: Councillors S Donaldson and G Laing, Bailies C Ahern and A Bailey and
Councillors P Barrett, B Brawn (substituting for A Chan), D Cuthbert, A Forbes,
D Illingworth (substituting for J Duff), I Massie (substituting for E Drysdale), Provost
McDade, T McEwen, J Rebbeck, C Shiers, C Stewart and Depute Provost A Parrott. 
In Attendance: T Glen, Chief Executive; S Devlin, Executive Director (Education and
Children’s Services); B Renton, Executive Director (Communities); C Mailer (Chief
Executive’s Service); J Pepper (Health and Social Care Partnership); G Boland
(Education and Children’s Services); S Best, L Brady, M Butterworth, B Cargill, A
Clegg, F Croft, S Coyle, S D’All, P Dickson, C France, K Fraser, L Haxton, S Nicol, F
Robertson, N Taylor (all Communities); K Donaldson, L Simpson, S MacKenzie, S
Walker, K Molley, D Adams, J Beveridge, L Harris, J Jennings, P Johnstone, A
Taylor, M Pasternak and A Brown (all Corporate and Democratic Services). 
Apologies: Councillors A Chan, E Drysdale and J Duff. 
Councillor S Donaldson, Convener, Presiding. 
The Convener led discussion on items 1-7, 9 and 10 and Vice-Convener on item 8. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting and apologies were
noted above. 
2. DECLARATIONS OF INTEREST 
In terms of the Councillors’ Code of Conduct:
(i)  Bailie A Bailey declared a financial interest in item 9.
(ii)  Bailie A Bailey and Councillor C Stewart declared a non-financial interest in
item 10.   
3. MINUTE OF PREVIOUS MEETINGS 
The minute of meeting of the Finance and Resources Committee of
30 November 2022 was submitted and approved. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
(i) The contents of the Outstanding Business Statement, be noted.
(ii) The removal of all completed actions from the Outstanding Business
Statement, be agreed.   
3(i)
Page 5 of 102

Page 6

5. REVENUE BUDGET 2022/23 – UPDATE NO.3 
There was submitted a report by Head of Finance (23/30) providing an update
on progress with the 2022/23 General Fund Revenue Budget based upon the
November 2022 ledger, updated for any subsequent known material movements and
the projected financial position of the Housing Revenue Account. 
Resolved:
(i) The contents of Report 23/30 be noted.
(ii) The projected outturn for General Fund Services, as set out in Section 5 of
Report 23/30 and Appendices 1 and 2 to this report, be noted.
(iii) The projected outturn for Corporate Budgets, as set out in Section 6 of Report
23/30, be noted.
(iv) The Health & Social Care projected outturn, as summarised in Section 6 of
Report 23/30 and Appendix 3 to this report, be noted.
(v) The projected outturn for the Housing Revenue Account, as summarised in
Section 7 of Report 23/30 and Appendix 4 to this report, be noted. 
6. COMPOSITE CAPITAL BUDGET 2022/28 & HOUSING INVESTMENT
PROGRAMME 2022/27 – MONITORING REPORT No.3 
There was submitted a report by the Head of Finance (23/31) providing a
summary position to date for the 6-year Composite (General Fund) Capital Budget
for 2022/23 to 2027/28 and the 5-year Housing Investment Programme 2022/23 to
2026/27 and seeking approval for adjustments to the programmes. 
Amendment (Councillors A Forbes and C Shiers) 
The Leader of the Council is instructed to write to the Scottish Government
asking for a detailed schedule of funding to renew all play areas in Perth and Kinross
and schedule of dates for bringing forward the funding to allow officers to plan the
investment and ensure it is allocated accordingly. 
After further discussions, Councillors A Forbes and C Shiers withdrew their
amendment. 
Amendment (Councillor C Stewart) 
Instruct Officers to pause making any further commitments until the Capital
Budget on 1 March 2023. 
THERE WAS A 15 MINUTE RECESS AND THE MEETING RECONVENED AT
15.30. 
Councillor C Stewart withdrew his amendment. 
Resolved:
(i) The content of report 23/31, be noted
(ii) The proposed adjustments to the six-year Composite Capital Budget 2022/23
to 2027/28, as set out in Sections 3 and 4 of Report 23/31 and summarised in
Appendix I and II to the report, be approved.
Page 6 of 102

Page 7

(iii) The proposed adjustments to the Housing Investment Programme Budget
2022/23 to 2026/27, as set out in Section 5 of Report 23/31 and summarised
in Appendix III to the report, be approved.
(iv) The update reports on the delivery of major Capital projects, attached at
Appendix IV of Report 23/31, be noted. 
7. TREASURY ACTIVITY AND COMPLIANCE REPORT 2022/23 QUARTER 3 
There was submitted a report by the Head of Finance (23/32) updating the
Committee on Treasury Activity for the quarter ending 31 December 2022, and to
report on compliance with the Council’s Treasury Management Policy Statement
(TMPS); Investment Strategy and Prudential Indicators. 
Resolved:
The contents of Report 23/32, be noted. 
8. FRAMEWORK FOR MANAGING WORKFORCE CHANGE 
There was submitted a report by the Corporate Human Resources Manager
(23/33) seeking approval of changes to the Framework for Managing Workforce
Changes. 
Amendment (Bailie A Bailey) 
Do not accept the recommendations in Report 23/33 and maintain the status
quo. 
In line with Standing Order 18.3, as no seconder to the amendment was
forthcoming, the amendment subsequently fell. 
Bailie Bailey asked for his dissent to the decision taken be recorded. 
Resolved:
The revised provisions within the Framework for Managing Workforce Change
be approved. 
9. DIGITAL PERTH AND KINROSS:  DIGITAL STRATEGY 2023-27 
There was submitted a report by the Head of Corporate IT And Revenues
(Chief Digital Officer) (23/34) introducing the refreshed Digital Strategy for the period
2023-2027. 
Resolved:
(i) The Digital Strategy 2023-2027 be approved.
(ii) Councillor Jack Welsh be nominated as the Council’s Digital Champion. 
10. COMMUNITY INVESTMENT FUND 2022/23 
There was submitted a report by the Head of Culture and Community
Services (23/35) informing of the funding commitments made for the 2022/23
Community Investment Fund (CIF) across the 10 ward panel areas (the 3 Perth City
wards are combined into 1 for the purposes of CIF).
Page 7 of 102

Page 8

Resolved:
(i) The funding decisions taken by Ward Panels for 2022/23 CIF be noted.
(ii) The carry forward of £68,000 for disbursal to community grassroots projects in
2023/24, for use in the wards there the underspends have arisen, be
approved.
Page 8 of 102

Page 9

EXECUTIVE SUB-COMMITTEE OF FINANCE AND
RESOURCES COMMITTEE 
Minute of hybrid meeting of the Executive Sub Committee of the Finance and
Resources Committee held in the Council Chamber, 2 Hight Street, Perth on
Wednesday 22 March 2023 at 3.00pm. 
Present: Councillors S Donaldson, G Laing, P Barrett, A Chan (substituting for
Councillor C Shiers), E Drysdale and C Stewart (substituting for Councillor
D Cuthbert). 
In Attendance: T Glen, Chief Executive; B Renton, Executive Director
(Communities); C Mailer (Chief Executive’s Service); A Cook and G Boland
(Education and Children’s Services); L Simpson, S MacKenzie, S Walker, K Molley,
A Brown and M Pasternak (all Corporate and Democratic Services). 
Also in Attendance: K McNamara and D Kidd, Tayside Contracts 
Apologies: Councillors J Duff, D Cuthbert, and C Shiers. 
Councillor S Donaldson, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting and apologies were
noted above. 
2. DECLARATIONS OF INTEREST 
There were no declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. REVENUE BUDGET 2022/23 – TAYSIDE CONTRACTS 
There was submitted a report by Head of Finance (23/98) (1) providing the
Executive Sub-Committee with an update on the financial projections for Tayside
Contracts; and (2) seeking authority for the Head of Finance to apply up to £1.1
million from unearmarked Reserves to meet the Council’s forecast obligations to
Tayside Contracts in 2022/23. 
Resolved:
(i) The contents of Report 23/98 and the latest financial projection for Tayside
Contracts, be noted. 
(ii) The Head of Finance be authorised to apply up to £1.1 million from
unearmarked Reserves to meet the Council’s forecast obligations to Tayside
Contracts in 2022/23 as set out in sections 5 and 6 of Report 23/98.
(iii) The Convener be requested to write to Tayside Contracts suggesting that
they set up a Performance/Scrutiny Sub-Committee to enable more regular in-
depth monitoring of performance.
3(ii)
Page 9 of 102

Page 10

Page 10 of 102

Page 11

FINANCE AND RESOURCES COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 23/119) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action 
due
Action
Expected
10. 30 November
2022
Revenue Budget
2022/23 – Update
No.2
An update to be
provided to
members
regarding
underspend in the
Health and Social
Care Partnership.
Verbal Update was given
by J Pepper at the
previous Finance and
Resources Committee on
1 February 2023. 
COMPLETED
Jacqueline Pepper 1 February
2023 
1 February
2023 
13.  1 February
2023 
Revenue Budget
2022/23 – Update
No. 3
An update to be
provided to
members on
graduate
resignations in
Early Learning and
Childcare.  
Email response issued to
all members. 
COMPLETED 
Sheena Devlin 26 April
2023 
26 April
2023 
14.  1 February
2023 
Digital Perth and
Kinross: Digital
Strategy 2023-27
Enquire with the
developer on
getting a second
master microphone
for the running of
Committee
Meetings. 
Elected Member Briefing
Note was issued. 
COMPLETED 
Alan Taylor  26 April
2023
26 April
2023 
4
Page 11 of 102

Page 12

Page 12 of 102

Page 13

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
26 APRIL 2023 
Revenue Budget 2022/23 – Update No.4 
Report by Head of Finance
(Report No. 23/120) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2022/23 General Fund
Revenue Budget based upon the January 2023 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected under spend on the 2022/23 General Fund
Management Budget is £860,000 (see Appendix 1). 
1.3 This report also provides an updated on the 2023/24 General Fund
Management Budget (see Appendix 7) 
2. RECOMMENDATIONS 
The Committee is requested to: 
A. note the contents of the report. 
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2. 
C. note the projected outturn for Corporate Budgets set out in Section 6. 
D. note the Health & Social Care projected outturn, which is summarised
in Section 6 and Appendix 3. 
E. note the projected outturn for the Housing Revenue Account which is
summarised in Section 7 and Appendix 4. 
F. approve the adjustments to the 2022/23 Management Revenue Budget
detailed in Appendices 1, 2, 4, 5 and 6 and Section 8, 9, and 10. 
G. approve the adjustments to the 2023/24 Management Revenue Budget
detailed in Section 11 and Appendix 7. 
3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
6
Page 13 of 102

Page 14

Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Other Revenue Budgets
Section 8 2022/23 Additional Funding
Section 9 2022/23 Virements
Section 10 2022/23 Movements in Reserves
Section 11 Adjustments to 2023/24 Revenue Budget 
4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2022/23 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the January 2023 ledger,
updated for any subsequent known material movements. 
4.2 The budget total reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the 2022/23 Final Revenue Budget on 23
February 2022 (Report No. 22/35 refers).  In addition, adjustments approved
by Council on 25 May, 17 August and 28 September 2022 (Report No. 22/252
refers), by the Strategic Policy & Resources Committee on 20 April (Report
No. 22/87), by the Finance & Resources Committee on 7 September & 30
November 2022 and 1 February 2023 (Report Nos. 22/208, 22/294 and 23/30
refer) and the Executive Sub-Committee of the Finance & Resources
Committee on 22 March 2023 (Report No. 23/98 refers) are reflected in
Appendix 1 (Column 2). 
4.3 On 22 June 2022, the Council approved the Financial Strategy which set out a
number of principles that will assist Medium Term Financial Planning and
development of Revenue and Capital Budgets (Report No. 22/141 refers). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 Details of variances against Service budgets are shown in Appendix 2 to this
report with the most significant variances summarised below.  The total net
projected under spend on Service budgets, as set out in Appendix 1 to this
report, is £1.291 million which represents 0.4% of total net Service
expenditure. 
5.2 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.3 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted inflation
levels.  This is already being seen in the cost of the materials required by
property and housing maintenance teams.  Going forward, this may have an
impact on projected outturns and future years’ budgets. 
Education & Children’s Services 
5.1 The projected outturn for Education & Children’s Services excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
Page 14 of 102

Page 15

anticipated to be £813,000 less than budget – a movement of £335,000 from
the position last reported to Committee.  The movements are summarised as
follows. 
5.2 Within non devolved Education Services there is an increase in the
projected under spend of £164,000.  These movements are made up of
additional staff slippage due to continued proactive workforce management
(£126,000) and other net under spends (£38,000). 
5.3 The updated financial consequences of the strikes that took place in January,
February and March 2023 amounted to an estimated £1.289 million in unpaid
salaries.  Consistent with the position agreed by the Committee on 1 February
2023, there is a proposal later in this report to transfer this amount to
Reserves.  The 2023/24 Revenue Budget, approved by Council on 1 March
applies this funding, in its entirety, to supporting the educational needs of
children and young people. 
5.4 In Services for Children, Young People & Families there is a reduction in
the projected over spend of £78,000.  The main factor contributing to this
movement is an increase in the projected level of staff slippage (£76,000) and
other net under spends (£2,000). 
5.5 In Business & Resource Services there is an increase in the projected
under spend of £107,000 due to increased staff slippage and reduced travel
costs. 
5.6 In Catering Services there is a reduction in the projected under spend of
£14,000 due to updated meal projections. 
5.7 There is a planned under spend of £807,000 on Devolved School
Management budgets (DSM) due primarily to staff slippage and recharges,
which represents 0.7% of the overall DSM budget.  It is anticipated that in line
with the approved DSM scheme, the eventual over and under spends will be
carried forward into 2023/24.  The budgets for the Devolved School
Management scheme are allocated by financial year (April – March), whereas
expenditure is incurred by academic year (August – June). 
5.8 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £300,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2023.  It is anticipated that the projected under
spend on teacher and support costs will be carried forward to 2023/24 to meet
commitments.  The budgets for the Pupil Equity Fund scheme are allocated
by financial year, whereas expenditure is incurred by academic year. 
Communities 
5.9 The projected outturn for Communities is currently anticipated to be £1.248
million less than budget – an increase of £985,000 from the previously
reported position.  The movements are summarised as follows. 
Page 15 of 102

Page 16

5.10 In Environment & Consumer Services there is a net reduction in the
projected over spend of £650,000.  The projected over spend on fuel has
reduced (£100,000), there are projected savings on waste disposal contracts
(£150,000), additional income from Bereavement Services (£80,000) and
savings on loan charges (£20,000).  In addition, the projected over spend on
winter maintenance has reduced (£450,000).  These are partially offset by an
increase in the projected over spend on vehicle materials and repairs
(£150,000). 
5.11 In Planning & Development there is a net increase in the projected under
spend of £405,000.  The main reason for this movement relates to additional
income from planning and building warrant fees (£350,000).  In addition, there
are further net under spends across the remainder of the division (£55,000). 
5.12 Within Business & Resources there is a net reduction in the projected under
spend of £60,000 in IT licensing and support costs.   
5.13 In Housing there is an increase in the net projected over spend of £10,000
due to updated security costs. 
Corporate & Democratic Services 
5.14 The projected outturn for Corporate & Democratic Services is currently
anticipated to be £850,000 more than budget – a reduction of £59,000 from
the previously reported projected over spend.  The main movements are
summarised as follows. 
5.15 In Property the projected over spend on energy has reduced by £162,000
based on the latest data which is partially offset by an increase of in
maintenance costs of £60,000.   
5.16 Across the remainder of the Service there is an increase in the net projected
under spend of £43,000. 
Chief Executive Service 
5.17 The projected outturn for the Chief Executive’s Service is currently anticipated
to be £80,000 less than budget due to staff slippage and additional income. 
6. REVENUE MONITORING – CORPORATE BUDGETS 
Health & Social care 
6.1 Across the Perth and Kinross Health & Social Care Partnership there is a
projected under spend of £2.723 million which is set out in Appendix 3.  This
projected under spend was considered in detail at the meeting of the Perth &
Kinross Integration Joint Board Audit & Performance Committee on 13 March
2023.  Within the overall projected under spend, £3.1 million relates to social
care. 
Page 16 of 102

Page 17

6.2 In relation to non-devolved functions there is currently a projected under
spend of £299,000 which is reflected in Appendix 1.  This is made up of staff
slippage as well as a rephasing of two approved transformation projects – see
paragraph 10.12. 
Council Tax Income 
6.3 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
6.4 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 March 2023 together
with prior year comparative figures for the previous five financial years. 
6.5 Between 2017/18 and 2021/22, the average collection figure to 31 March was
96.93%.  The actual collection figure to 31 March 2023 was 97.95% which is
an increase of 1.02% compared to the historical average and a 0.78%
increase on the comparable position in 2022. 
Page 17 of 102

Page 18

6.6 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
6.7 Given the 2022/23 collection rate that is set out at paragraph 6.5 above, as
well as collection of historic debt, the latest projected outturn indicates that
Council Tax income will be £200,000 more than budget in the current year. 
Council Tax Reduction Scheme 
6.8 Council Tax Reduction is a statutory function and encouraging take up is a
key responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.9 The Council is currently supporting approximately 8,300 households across
Perth and Kinross with the Council Tax Reduction Scheme with an average
award of £16 per week.  This results in a projected over spend on the Council
Tax Reduction Scheme of approximately £680,000. 
Non-Domestic Rates 
6.10 The actual collection rate to 31 March 2023 was 97.91%, compared to
94.29% for the same period in 2021/22. 
Tayside Contracts 
6.11 On 1 February 2023, the Finance & Resources Committee were updated on
the financial challenges facing Tayside Contracts in 2022/23 (Report No.
23/30 refers).  This update also advised that, should additional financial
support be required, an Executive Sub-Committee of the Finance &
Page 18 of 102

Page 19

Resources Committee would be called to authorise funding to provide
additional support. 
6.12 The Executive Sub-Committee of the Finance & Resources Committee met
on 22 March 2023 to receive the latest update on Tayside Contracts (Report
No. 23/98 refers).  As part of this update, approval was granted to apply up to
£1.1 million of unearmarked Reserves to meet the Council’s share (34%) of
the projected losses of Tayside Contract’s Facilities Division.  This is now
reflected in Appendix 1 to this revenue monitoring report. 
7. REVENUE MONITORING – OTHER REVENUE BUDGETS 
Housing Revenue Account 
7.1 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main movements from the last update are
summarised below and set out in Appendix 4. 
7.2 Across the Housing Revenue Account, the projected outturn has increased by
a net £358,000.   The main movements arise from a reduction in staff slippage
due to the back dated pay award and additional costs due to burst pipes
which is partially offset by additional income. 
7.3 As a result of the variances identified above Capital from Current Revenue will
be reduced by £358,000. 
Impact on Arm’s Length External Organisations (ALEOs) 
7.4 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Horsecross Arts (Hx Arts)
and Culture Perth & Kinross (CPK) who make an important contribution to the
wellbeing of both citizens and visitors to Perth and Kinross. 
7.5 As sole member and core funder of all three ALEOS, the Council has
managed financial risk by maintaining normal monthly service level
agreement payments to all three organisations to mitigate the impact of
Covid-19.  In addition, officers continue to work closely with all three ALEOs to
understand the impact of Covid-19 more fully on service delivery. 
7.6 To date, no significant financial issues have been identified relating to Culture
Perth and Kinross or Horsecross Arts Ltd. 
7.7 Live Active Leisure is currently projecting a deficit for 2022/23 but this will be
funded from its own Reserves and therefore has no financial impact on the
Council. 
7.8 The long-term impact of Covid-19 on the Council’s ALEOs across future
financial years will be kept under review with updates provided to future
meetings of the Finance & Resources Committee. 
Page 19 of 102

Page 20

8. 2022/23 ADDITIONAL FUNDING 
8.1 Since the 2022/23 Revenue Budget was updated on 1 February 2023 (Report
No. 23/30 refers), the Council has been advised of additional funding for the
current financial year from several sources.  To ensure that the 2022/23
Management Budget continues to reflect the operational requirements of the
Council, several adjustments are required, which are summarised below and
included in Appendix 1 and Appendix 5. 
Scottish Government – Revenue Support Grant: 
• Teachers Pay Award: £866,000 (Education & Children’s Services) 
• Scottish Child Payment Bridging Payments: £71,000 (Corporate &
Democratic Services (CDS)) 
• Self-Isolation Assistance Service - £19,000 (CDS)
• Project Unicorn: £5,000 (Communities) 
8.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £961,000 will be made through a redetermination of
the Council’s Revenue Support Grant.  It is therefore necessary to adjust
budgets for Education & Children’s Services, Communities, Corporate &
Democratic Services and Revenue Support Grant. 
8.3 ACTION: The Council is asked to approve the adjustments set out at
paragraph 8.2 which is reflected in Appendix 1 (Column 3) to this report. 
Other Funding 
8.4 Other funding amounting to £1.883 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 5. 
8.5 ACTION: The Committee is asked to note the receipt of £1.883 million of
additional resources, with this funding being reflected within Communities and
Corporate & Democratic Services as additional grant income.  The current
projected outturn assumes that all these additional resources will be fully
expended in 2022/23 or will be carried forward under the terms of the grant
award. 
9. 2022/23 VIREMENTS 
Contribution to/from Capital Fund 
9.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
9.2 The latest monitoring indicates a reduction in the projected outturn for capital
financing costs (loan charges) of £15,000 based on the latest treasury
Page 20 of 102

Page 21

management activity and a reduction of £79,000 in income from interest on
revenue balances.  This will result in a reduced Contribution to the Capital
Fund of £64,000 in the current financial year. 
9.3 ACTION: The Committee is requested to approve the virement of £15,000
from the Capital Financing Costs (Loan Charges) Budget and £79,000 from
Interest on Revenue Balances with a corresponding reduction in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 4) to this report. 
Service Virements 
9.4 To ensure that the 2022/23 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 4) that have been
processed in line with the Scheme of Administration.   
• Communities to Capital Grant - £30,000 – to reflect a rephasing of
expenditure on Tactran capital projects - this funding will be reinstated
in 2023/24.
• Contribution to 2022/23 Pay Award to Education & Children’s Services
- £3.056 million – to reflect the additional cost of the pay award to
teachers that was accepted in early March 2023. 
10. 2022/23 MOVEMENTS IN RESERVES 
Updated Financial Implications of Strike Action 
10.1 The updated financial implications of the strikes that took place in January
and February 2023 is currently estimated at £1.289 million.  As advised at
paragraph 5.6, the 2023/24 Revenue Budget that was approved on 1 March
2023 applied all these resources towards supporting the educational needs of
children and young people in future years. 
10.2 ACTION: The Committee is asked to approve the transfer of £1.289 million
from Education & Children’s Services to the earmarked Reserve for Children
and Young People’s Residential Care.  This adjustment is reflected in
Appendix 1 (Column 5) to this report. 
Works Maintenance 
10.3 The Council has previously earmarked Reserves for maintenance works
around the River Ericht.  Approval is sought to transfer £200,000 from the
projected under spend in Communities in 2022/23 to carry out further
remedial works. 
10.4 ACTION: The Committee is asked to approve the transfer of £200,000 from
Communities to the Works Maintenance earmarked Reserve.  This
adjustment is reflected in Appendix 1 (Column 5) to this report. 
Page 21 of 102

Page 22

Council Approved Expenditure 
10.5 In setting the 2022/23 Revenue Budget in February 2022, the Council
approved expenditure to fund several initiatives.  For a variety of reasons
including consultation and capacity issues, there has been slippage in the
delivery of these projects that may result in the expenditure not being incurred
in the current financial year.  Projects totalling £60,000 are set out at
Appendix 6. 
10.6 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 6 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery. 
The final outturn for individual projects may change before the end of the
financial year.  Therefore, by agreeing the projects within Appendix 6, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves. 
10.7 Should any of the projects no longer be a priority, the projected underspend
would be available to support the financial management of the Council in both
current and future financial years. 
10.8 ACTION:  the Committee is asked to confirm that the projects listed in
Appendix 6 remain a priority and that the final under spends, currently
projected at £60,000 are transferred to an earmarked Reserve to ensure
delivery. 
Property Maintenance 
10.9 The Council’s unearmarked Reserves includes provision for Property
Maintenance works on cemeteries.  Approval is sought to draw down £34,000
to fund activity in 2022/23. 
10.10 ACTION: the Committee is asked to transfer £34,000 from the Property
Maintenance earmarked Reserve to Corporate & Democratic Services to fund
works on cemeteries.  This adjustment is reflected in Appendix 1 (Column 5)
to the report. 
Transformation Projects 
10.11 Due to a rephasing of expenditure there is a requirement to adjust budgets for
the following approved projects as follows: 
• Perth and Kinross Offer - £60,000 from the Chief Executive’s Service
• Modernising Performance - £15,000 from the Chief Executive’s Service
• Low Carbon Initiatives - £49,000 from Communities
• Care at Home Mobile Technology - £46,000 from Health & Social Care
• Mental Health Officer Training - £83,000 from Health & Social Care 
10.12 ACTION: The Committee is asked to approve the transfers to the
Transformation and Workforce Management earmarked Reserve set out at
Page 22 of 102

Page 23

paragraph 10.11 above.  These adjustments are reflected in Appendix 1
(Column 5) to the report. 
Financial Insecurity / Tackling Poverty 
10.13 In approving the earmarked Reserves on 1 March 2023, the Council was
advised of a projected under spend on financial insecurity projects of
£650,000 (Report No 23/72 refers).  Furthermore, there is now a projected
under spend of £30,000 on the funding approved by Council on 28 September
2022 in relation to Tackling Poverty and the Cost of Living (Report No. 22/252
refers).  Approval is sought to transfer these under spends to the Financial
Insecurity earmarked Reserve to be utilised in 2023/24. 
10.14 ACTION: The Committee is asked to approve the transfer of £680,000 from
Corporate & Democratic Services and the Chief Executive’s Service to the
Financial Insecurity earmarked Reserve.  These adjustments are reflected in
Appendix 1 (Column 5) to the report. 
Culture 
10.15 Approval is sought to draw down £23,000 from the earmarked Reserve to
support Culture to meet the costs of the Review of Libraries 
10.16 ACTION: The Committee is asked to approve the transfer of £23,000 from the
earmarked reserve for Culture to Communities.  This adjustment is reflected
in Appendix 1 (Column 5) to the report. 
Revenue Grants 
10.17 The Council received £50,000 to support trauma informed practice in 2022/23. 
Approval is sought to transfer this to the Health & Social Care Partnership to
take this forward. 
10.18 ACTION: The Committee is asked to approve the transfer of £50,000 from the
earmarked reserve for Revenue Grants to Health & Social Care.  This
adjustment is reflected in Appendix 1 (Column 5) to the report. 
Council Tax Second Homes 
10.19 Approval is sought to apply £104,000 from the Council Tax Second Homes
earmarked Reserve to fund activity in 2022/23. 
10.20 ACTION: The Committee is asked to approve the transfer of £104,000 from
the Council Tax Second Homes earmarked reserve to Communities.  This
adjustment is reflected in Appendix 1 (Column 5) to the report. 
Community Investment Fund 
10.21 On 1 February 2023, the Finance & Resources Committee were advised of
the outcome of commitments made by individual ward panel areas (Report
No. 23/35 refers).  This resulted in a projected under spend of £51,000 in
Page 23 of 102

Page 24

2022/23.  Approval is sought to transfer this under spend to the Community
Investment Fund earmarked Reserve for use in 2023/24. 
10.22 ACTION: The Committee is asked to approve the transfer of £51,000 from
Communities to the Community Investment Fund earmarked Reserve.  This
adjustment is reflected in Appendix 1 (Column 5) to the report. 
Local Action Partnerships 
10.23 Approval is sought to drawdown £17,000 from the Local Action Partnerships
earmarked Reserve to fund activity in 2022/23. 
10.24 ACTION: The Committee is asked to approve the transfer of £17,000 from the
Local Action Partnerships earmarked Reserve to Communities.  This
adjustment is reflected in Appendix 1 (Column 5) to the report. 
Climate Change 
10.25 Due to slippage and a rephasing of activity there is a projected under spend of
£140,000 on climate change related budgets.  Consistent with the Councils
commitment to climate change, approval is sought to create an earmarked
Reserve for climate change to allow for the movement of resources between
financial years and that the final under spend in 2022/23 (currently projected
at £140,000) is transferred to this earmarked Reserve. 
10.26 ACTION: The Committee is asked to approve the creation of an earmarked
Reserve for Climate Change and that the final under spend in 2022/23
(currently projected at £140,000) is transferred to this earmarked Reserve. 
This adjustment is reflected in Appendix 1 (Column 5) to the report. 
Ventilation Measures 
10.27 The Council has previously allocated resources to enhance ventilation
measures, particularly around the installation of CO2 monitors across the
learning estate.  Approval is sought to transfer £90,000 of this funding to
earmarked Reserves to allow the work to be completed in 2023/24. 
10.28 ACTION: The Committee is asked to approve the transfer of £90,000 from
Corporate & Democratic Services to earmarked Reserves to complete the
installation of CO2 monitors.  This adjustment is reflected in Appendix 1
(Column 5) to the report. 
11. ADJUSTMENTS TO 2023/24 REVENUE BUDGET 
2023/24 Additional Funding 
11.1 Since the 2023/24 Revenue Budget was approved on 1 March 2023 (Report
No. 23/72 refers), the Council has been advised of additional funding in
2023/24 from the Scottish Government as follows.  To ensure that the
2023/24 Management Budgets continue to reflect the operational
Page 24 of 102

Page 25

requirements of the Council, several adjustments are required, which are
summarised below and included in Appendix 7. 
Revenue Support Grant 
• Living Wage: £3.035 million (Health & Social Care - £2.905 million,
Communities - £130,000) 
• Discretionary Housing Payment: £822,000 (Corporate & Democratic
Services) 
• Reduction in Funding: £135,000 
Ring-Fenced Grant 
• Early Learning Centre Reduction: reduction of £4,000 (Education &
Children’s Services) 
11.2 The Scottish Government has advised that the adjustment in funding
identified at 11.1 will be made through a redetermination of the Council’s
Revenue Support Grant.  It is therefore necessary to adjust the budgets for
Education & Children’s Services, Communities, Corporate & Democratic
Services, Health & Social Care, Revenue Support Grant and Ring-Fenced
Grant. 
11.3 ACTION: The Committee is asked to approve the adjustments set out at
paragraph 11.2 above.  These adjustments are reflected in Appendix 7
(Column 2) to this report. 
2023/24 Service Virements 
11.4 To ensure that the 2023/24 Management Revenue Budget continues to reflect
current Service needs and operational requirements the following virements
between budgets are required. 
• Capital Grant to Communities (£30,000) to reflect a rephasing of
expenditure on Tactran capital projects – this is brought forward from
2022/23 
2023/24 Movements in Reserves 
Transformation Projects 
11.5 Due to the rephasing of expenditure identified in paragraph 10.11 above,
approval is sought to draw down this funding to take forward the following
approved projects in 2023/24: 
• Perth and Kinross Offer - £60,000 to the Chief Executive’s Service
• Modernising Performance - £15,000 to the Chief Executive’s Service
• Low Carbon Initiatives - £49,000 to Communities
• Care at Home Mobile Technology - £46,000 to Health & Social Care
• Mental Health Officer Training - £83,000 to Health & Social Care
Page 25 of 102

Page 26

11.6 ACTION: The Committee is asked to approve the transfers from the
Transformation and Workforce Management earmarked Reserve listed in 11.7
above. These adjustments are reflected in Appendix 6 (Column 4) to this
report. 
Council Approved Expenditure 
11.7 Approval is sought to apply funding to the Council approved projects identified
at paragraph 10.8 and Appendix 6 to 2023/24 to ensure that they are
delivered. 
11.8 ACTION: The Committee is asked to approve the adjustments set out at
paragraph 11.9 above and Appendix 6 in 2023/24.  These adjustments are
reflected in Appendix 7 (Column 4) to this report. 
Revenue Grants 
11.9 The Council received £50,000 to support trauma informed practice in 2023/24. 
Approval is sought to transfer this to the Health & Social Care Partnership to
take this forward. 
11.10 ACTION: The Committee is asked to approve the transfer of £50,000 from the
earmarked reserve for Revenue Grants to Health & Social Care.  This
adjustment is reflected in Appendix 7 (Column 4) to the report. 
Community Investment Fund 
11.11 Approval is sought to apply the 2022/23 projected under spend of £51,000 on
the Community Investment Fund identified in paragraph 10.22 to 2023/24. 
11.12 ACTION: The Committee is asked to approve the transfer of £51,000 from the
Community Investment Fund earmarked Reserve to Communities.  This
adjustment is reflected in Appendix 7 (Column 4) to the report. 
Ventilation Measures 
11.13 Approval is sought to apply £90,000 from earmarked Reserves to complete
the installation of CO2 monitors across the learning estate – see paragraph
10.29. 
11.14 ACTION: The Committee is asked to approve the transfer of £90,000 from
Corporate & Democratic Services to earmarked Reserves to complete the
installation of CO2 monitors.  This adjustment is reflected in Appendix 7
(Column 4) to the report. 
Additional Support for Young People 
11.15 As advised earlier in this report, the updated financial implications of the
strikes that took place in 2022/23 was £1.289 million.  This was £250,000
more than the amount used in setting the 2023/24 Revenue Budget on 1
Page 26 of 102

Page 27

March 2023.  On the basis that the proposal at paragraph 10.6 is agreed, this
funding will sit in earmarked Reserves on 31 March 2023. 
11.16 Consistent with the position agreed by the Committee on 1 February 2023, it
is proposed that this additional funding of £250,000 is applied to supporting
the educational needs of children and young people. 
11.17 This investment will support the development of the workforce by providing
professional learning and specialist qualifications for teaching and support
staff in intensive support provisions. Specifically for teachers of children and
young people with hearing and visual impairment across all sectors, for
outreach teachers who support children with emotional and behavioural needs
and additional support needs in our primary schools, and for principal
teachers (support for learning) in secondary schools. It will all also assist with
the provision of resources for children and young people with complex needs
or a disability across the Council. 
11.18 ACTION: The Committee is asked to approve the transfer of £250,000 from
earmarked Reserves to Education & Children’s Services to provide additional
support for young people.  This adjustment is reflected in Appendix 7
(Column 4) to the report. 
12. CONCLUSION 
12.1 Currently, a projected under spend of £860,000 has been identified in the
current financial year. 
12.2 The financial position of the Council and its partners and ALEOs remains
challenging and regular updates will be provided to the Council and the
Finance & Resources Committee as the position develops. 
Author(s)
Name  Designation Contact Details
Scott Walker Chief Accountant CHXFinance@pkc.gov.uk 
APPROVED
Name  Designation Date
Stewart Mackenzie  Head of Finance 31 March 2023
Karen Donaldson  Chief Operating Officer 3 April 2023 
Page 27 of 102

Page 28

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 28 of 102

Page 29

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Executive Leadership Team have been consulted in the preparation of
this report.
Page 29 of 102

Page 30

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix 1 – 2022/23 Management Budget
• Appendix 2 – General Fund 2022/23 Projected Outturn – Service
Analysis
• Appendix 3 – Perth & Kinross Integration Joint Board
• Appendix 4 – Housing Revenue Account 2022/23 Projected Outturn
• Appendix 5 – Revenue Grants
• Appendix 6 – Council Approved Projects
• Appendix 7 – 2023/24 Management Budget 
Page 30 of 102

Page 31

(1) (2) (3) (4) (5) (6) (7) (8) (9)
2022/23 Previously Movements Virements Movements 2022/23 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
SERVICE £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
Education & Children's Services 212,418 11,742 866 3,056 (1,309) 226,773 225,960 (813) (0.36%)
Communities 71,165 4,840 5 (115) (336) 75,559 74,311 (1,248) (1.65%)
Corporate & Democratic Services 35,228 6,344 90 (706) 40,956 41,806 850 2.08%
Chief Executive Service 1,174 1,793 (105) 2,862 2,782 (80) (2.80%)
Sub - Total: Service Budgets 319,985 24,719 961 2,941 (2,456) 346,150 344,859 (1,291) (0.4%)
Corporate Budgets
Health & Social Care 74,866 7,709 85 (79) 82,581 82,282 (299) (0.4%)
Contribution to Valuation Joint Board 1,309 1,309 1,309 0 0.00%
Capital Financing Costs 13,866 (1,408) (15) 12,443 12,443 0 0.00%
Interest on Revenue Balances (200) (1,827) 79 (1,948) (1,948) 0 0.00%
Net Contribution to/(from) Capital Fund 1,530 (19) (64) 1,447 1,447 0 0.00%
Contribution to/(from) Insurance Fund 200 1,000 1,200 1,200 0 0.00%
Trading Operations Surplus (550) (550) (300) 250 45.45%
Support Service External Income (2,153) (2,153) (2,153) 0 0.00%
Tayside Pension Fund 1,565 1,565 1,565 0 0.00%
Contribution to 2022/23 Pay Award 0 4,192 (4,192) 0 0 0 0.00%
Apprenticeship Levy 818 818 818 0 0.00%
Council Tax Reduction Scheme 6,200 6,200 6,880 680 10.97%
Discretionary Relief 150 150 150 0 0.00%
Net Expenditure (General Fund) 417,586 34,366 961 (1,166) (2,535) 449,212 448,552 (660) (0.1%)
Financed By:
Revenue Support Grant (234,656) (23,890) (961) (259,507) (259,507) 0 0.00%
Ring Fenced Grant (17,194) (209) (17,403) (17,403) 0 0.00%
Non Domestic Rate Income (46,141) (46,141) (46,141) 0 0.00%
Council Tax Income (98,941) 6,737 (92,204) (92,404) (200) (0.2%)
Capital Grant (1,600) (120) 30 (1,690) (1,690) 0 0.00%
Total Financing (398,532) (17,482) (961) 30 0 (416,945) (417,145) (200) (0.0%)
Financed from/(returned to) Reserves 19,054 16,884 0 (1,136) (2,535) 32,267 31,407 (860)
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2022/23 REVENUE
BUDGET - SUMMARY
6
Page 31 of 102

Page 32

Page 32 of 102

Page 33

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2022/23 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2023)
Variance Variance
£'000 £'000
Education & Children's Services
Total (813)
DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
There are 66 primary schools, 7 secondary schools, 4 all through schools, 46 nurseries and early learning
centres and 1 special school within the Council's DSM scheme.  Each school has an individual budget,
primarily based on pupil numbers.  Headteachers are responsible for the annual budgets devolved to them in
April each year. The total DSM budget for 2022/23 is £113.876 million including carry forwards. 
Within the scheme there is a facility allowing for DSM balances, whether surplus or deficit, to be brought
forward from the previous financial year. In addition to the resources devolved, balances may also be available
to headteachers of schools that have a carry forward. In 2021/22, £1.191 million of DSM balances were
brought forward.
(816) Staff Costs
Additional slippage due to staff turnover
(107) Property Costs
Projected under spend on landfill recharges based on latest activity.
116 Supplies & Services
Projected over spend on supplies and services within schools.
807 There is currently a projected net under spend of £807,000 based on current spending plans from schools for
the current academic year that runs to June 2023.  The maximum carry forward under the DSM scheme is
2.5%,  the current projection is 0.7%.
Pupil Equity Fund
(300) The majority of schools within Perth & Kinross Council have been allocated a share of £1.874 million of Pupil
Equity Funding from the Scottish Government as a ring fenced grant.  Schools are being instructed to use this
year’s PEF Grant by 31 March 2023 as per the revised Scottish Government guidance. At this time £300,000
is projected to be carried forward into 2023/24 for teacher and support staff costs to the end of the current
academic year.
300 Projected carry forward of Pupil Equity Funding.
NON DEVOLVED
Education Services
Nursery Sector
(354) Additional slippage due to turnover of staff.
(25) Savings from Industrial action
(31) Savings from non-domestic rates as early learning centres are exempt from the charge.
Primary Sector
(706) Savings from industrial action
Secondary Sector
(83) Additional slippage due to turnover of staff.
(698) Savings from Industrial action
(163) Projected under spend on investment in learning unitary charge due to  an insurance rebate.
(20) Home to School Transport - projected under spend due to less school days (£47,000) partially offset by
projected over spend on transport costs for Central Music Groups (£27,000).
70 Projected shortfall on income from Renewable Heat Initiative Rebate (£70,000).
SERVICE Summary of Service Variances
6
Page 33 of 102

Page 34

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2022/23 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Special Sector
(163) Additional slippage due to turnover of staff.
(105) Savings from industrial action.
(337) Projected under spend on home to school transport after allowing for non-recurring increase of £250,000.
(216) There is a projected under spend on the  budget for young people with additional support needs (ASN) who
are educated out with the Council's mainstream school provision.
1,534 Transfer to Reserves of savings from industrial action.
Services for Children, Young People & Families
(264) Additional slippage due to turnover of staff.
99 Projected over spend on legal fees and translation / interpreter services
77 Projected over spend on client travel.
1,466 The budget for young people with complex behavioural issues, which includes a number of pupils placed
within residential schools, is projected to overspend due to additional demand.
294 A projected over spend on Kinship Care (£545,000) due to demand partially offset by a projected under spend
in Foster Care (£251,000).
(8) There is a projected under spend in relation to supporting care experienced young people (continuing care,
supported accommodation). 
95 There is a projected over spend on self directed support (children & disability team - respite provision) due to
the level of demand and an increase to the hourly rate paid to clients.
(293) Additional grant funding for Unaccompanied Asylum Seeking Children (£246,000); Wellbank rental income
(£20,000) and the Alcohol & Drug Partnership (£27,000).
Business and Resources Services
(227) Additional slippage due to turnover of staff.
(53) Projected under spend due to Area Office recharge no longer required, reduced travel and reduction in spend.
20 Projected over spend on school clothing grants based on activity to date.
Catering Services
(68) Additional staff slippage.
(600) Projected under spend within the Early Learning & Childcare 1140 grant for nursery meals.
(236) Projected under spend of school meals due to uptake partially offset below by reduced income.
63 Projected over spend on Free School Meals during holiday periods due to need and two extra public holidays.
119 Projected shortfall in income from breakfast clubs.
Page 34 of 102

Page 35

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2022/23 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Communities
Total (1,248)
BUSINESS AND RESOURCES
Service Wide
(1,000) Staff slippage in excess of budgeted target
Administration
90 Projected over spend on IT Licensing & Support costs
30 Various minor projected over spends across Business & Resources
Public Transport Unit / Car Parking Account
25 Perth Bus Station - increased costs
(80) Corporate Asset Management - accelerated savings
50 Car Park Trading Account - projected reduction in income and increased provision for bad debts
(50) Drawdown from Car Park Trading Account earmarked Reserve
135 Projected over spend on tendered services
(65) Additional income from Park and Ride departure charges
ENVIRONMENTAL AND CONSUMER SERVICES
Roads
(250) Projected additional income from statutory road network works
150 Additional costs of recent severe weather events
750 Projected over spend on winter maintenance
110 Maintenance works at River Ericht
(95) Contribution from Scottish Government
(200) Projected saving on street lighting power due to positive impact of LED replacement programme
(50) Projected under spend on street lighting maintenance
(100) Projected under spend and additional grant income across traffic & network budgets
(100) Projected under spend on programme of flood risk studies
Regulation
25 Projected shortfall in Corporate Health and Safety income
Operations
220 Projected shortfall in commercial waste income
(150) Projected additional income from sale of recyclates due to favourable market prices
300 Projected additional cost of fuel across Operations due to increase in price
50 Additional hire costs for refuse collection vehicles
(150) Projected savings on waste disposal contracts
Fleet Management
(300) Saving on loan charges due to slippage on planned vehicle replacement programme
250 Additional cost of vehicle materials and repairs
Community Greenspace
(50) Projected underspends across Community Greenspace budgets
Bereavement Services
(80) Additional income from Bereavement Services
PLANNING AND DEVELOPMENT
127 Perth Harbour - projected increase in operating costs /shortfall in income
60 Projected shortfall in Commercial Rent Income
(75) Projected under spend within Market Development Grants
(90) Various minor under spends and additional income across Planning & Development
(750) Additional Planning & Building Warrant Income
(70) Various under spends across Business & Place
(50) Various under spends across Employability
(30) Projected under spend within Housing Strategy
90 Projected over spend within Events budgets
Page 35 of 102

Page 36

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2022/23 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
HOUSING
35 Greyfriars - projected increased in void rent loss and provision for bad debts
10 Greyfriars - projected increase in energy costs
(25) Temporary accommodation - reduction in estimated bad debt provision
(15) St Catherine's - reduced security costs
30 Cost of Local House Condition Survey to inform the Local Housing Strategy
30 Void Rent Loss for Housing Support properties
20 Various minor projected over spends with Safer Communities
(10) Various minor projected under spends within Housing
Page 36 of 102

Page 37

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2022/23 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2023)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Corporate & Democratic Services
Total 850
Legal & Governance Services
(72) Additional staff slippage
(74) Projected additional income from licensing and recharges
28 Projected over spend in relation to elected members
12 Net projected over spend across function
Finance
(11) Net projected under spend across Division
Human Resources
(196) Additional projected income from salary sacrifice scheme and other recharges
Net projected over spend on other budgets
Information Technology and Revenues & Benefits
(16) Miscellaneous other projected net under spends.
Property
599 Projected over spend on energy costs due to inflationary pressures.
850 Projected over spend on maintenance relating to compliance remedial works.
(270) Net projected under spend on staff costs after adjusting for professional fee income chargeable on projects
Chief Executive Service
Total (80) Core Costs
(80) Staff slippage and additional income
TOTAL (1,291)
Page 37 of 102

Page 38

Page 38 of 102

Page 39

APPENDIX 3
Perth and Kinross Integration Joint Board (IJB)
Projected outturn based on Revenue Monitoring to 31 December 2022
Social Care Health
Health & Social
Care Partnership
£'000 £'000 £'000
DEVOLVED FUNCTIONS
Older People Services (2,496) (44) (2,540)
Adult Services (33) (774) (807)
Other Community Services (389) 0 (389)
Management/Commissioned/Other (667) (592) (1,259)
Undelivered Savings 1,193 740 1,933
Budget Deficit 0 210 210
Sub Total - Hospital & Community Health (2,392) (460) (2,852)
P&K IJB Hosted Services 0 (592) (592)
Dundee & Angus Hosted Services Recharges In/Out excl Covid 0 253 253
Sub Total - Hosted Services 0 (339) (339)
GP Prescribing / Other Family Health Services 0 795 795
General Medical Services / Family Health Services 0 381 381
Sub Total - PKHSCP (2,392) 377 (2,015)
PKC Funding (708) 0 (708)
Total Projected Outturn PKHSCP (3,100) 377 (2,723)
Projected Out-turn Over / (Under) Spend
6
Page 39 of 102

Page 40

Page 40 of 102

Page 41

APPENDIX 4
PERTH & KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2022/23 PROJECTED OUTTURN
(Based on expenditure to 31 January 2023)
£'000
324 Housing Repairs
A projected over spend within stores (£200,000) as a result of the increased cost of materials, agreed increase in costs for Internet of
Things (IOT) project due to increased demand (£20,000), projected increase in costs for diesel (£29,000), increased costs for gas and
electric (£37,000), transport hire costs (£38,000) plus increased costs for waste disposal (£41,000).  These projected over spends are
partially offset by staff slippage (£41,000).
(189) Improvements
Projected under spend on staff costs (£100,000) and additional income from OFGEM (£95,000) partially offset by other minor over
spends (£6,000).
16 Letham, North & South
Projected over spends on staff costs (£43,000), decant costs due to burst pipes (£20,000) and non-staff budgets (£14,000).  These
pare partially offset by projected under spends on transport costs (£20,000) and Sheriff Officers fees and related income (£41,000).
102 Perth City and Specialist
Projected net over spends on electricity and gas costs within Sheltered Housing (£80,000), decant costs due to burst pipes (£33,000),
non-staff budgets (£8,000) and cleaning costs (£10,000) partially offset by additional staff slippage (£5,000) and  additional housing
register income (£24,000).
26 Housing Management
Projected over spend on staff costs, including the Apprenticeship Levy (£17,000) and other non staff budgets (£9,000).
(215) Administration
Projected under spend on bad debt provision (£350,000), lower corporate recharges compared to budget (£103,000), reduced
recharges from the General Fund (£58,000) and under spends in non-staff budgets (£22,000).  These are partially offset by projected
over spends on void rent loss based on similar trend to last year (£162,000), void rates / Council Tax / utilities (£106,000), bad debt
provision (£37,000) and recharges (£13,000). 
2 Income
Projected shortfall in income from commercial rents (£17,000) and mainstream housing (£104,000) which is partially offset by
increases in interest on revenue balances (£100,000). 
(66) Capital Financed from Current Revenue
As a result of the projected net under spends highlighted above, this is the increase in the amount available to invest in the HRA
capital programme from the Revenue Budget.
0
Summary of Service Variances
6
Page 41 of 102

Page 42

Page 42 of 102

Page 43

APPENDIX 5
Other Grant Funding
Education & Children’s Services
Scottish Government – Educational Support to Ukrainian Children & Young People £675,718
Communities
Scottish Government – Delivery of Rural Community Led Local Development Funding
2022/23 (CLLD) £262,462
UK Government – DLUHC - UK Shared Prosperity Fund  £893,684
Corporate & Democratic Services
Scottish Government - DHP 2022/23 Additional Funding £50,644
TOTAL £1,882,508
6
Page 43 of 102

Page 44

Page 44 of 102

Page 45

APPENDIX 6
Council Approved Projects - 23 February 2022
Education & Children’s Services
Food Insecurity Funding £20,000
Communities
Rural Events £40,000
Total £60,000
6
Page 45 of 102

Page 46

Page 46 of 102

Page 47

(1) (2) (3) (4) (5)
2023/24 Movements Virements Movements 2023/24
Council in in Revised
Approved Funding Reserves Mgt
Budget Budget
SERVICE £'000 £'000 £'000 £'000 £'000
Education & Children's Services 230,985 (4) 270 231,251
Communities 70,439 130 30 140 70,739
Corporate & Democratic Services 39,596 822 90 40,508
Chief Executive Service 3,712 75 3,787
Sub - Total: Service Budgets 344,732 948 30 575 346,285
Corporate Budgets
Health & Social Care 83,958 2,905 179 87,042
Contribution to Valuation Joint Board 1,309 1,309
Capital Financing Costs 15,137 15,137
Interest on Revenue Balances (5,054) (5,054)
Net Contribution to/(from) Capital Fund 3,099 3,099
Contribution to/(from) Insurance Fund 200 200
Trading Operations Surplus (550) (550)
Support Service External Income (2,153) (2,153)
Tayside Pension Fund 1,725 1,725
Apprenticeship Levy 818 818
Council Tax Reduction Scheme 6,200 6,200
Discretionary Relief 1,104 1,104
Net Expenditure (General Fund) 450,525 3,853 30 754 455,162
Financed By:
Revenue Support Grant (239,627) (3,722) (243,349)
Ring Fenced Grant (17,725) 4 (17,721)
Non Domestic Rate Income (60,754) (60,754)
Council Tax Income (103,914) (103,914)
Capital Grant (1,600) (30) (1,630)
Total Financing (423,620) (3,718) (30) 0 (427,368)
Financed from/(returned to) Reserves 26,905 135 0 754 27,794
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2023/24 REVENUE
BUDGET - SUMMARY
6
Page 47 of 102

Page 48

Page 48 of 102

Page 49

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
26 APRIL 2023 
COMPOSITE CAPITAL BUDGET 2022/28 & HOUSING INVESTMENT
PROGRAMME 2022/27 – MONITORING REPORT NUMBER No.4 
Report by the Head of Finance
(Report No. 23/121) 
1. PURPOSE 
This report provides a summary position to date for the 6-year Composite
(General Fund) Capital Budget for 2022/23 to 2027/28 and the 5-year
Housing Investment Programme 2022/23 to 2026/27 and seeks approval for
adjustments to the budgets. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
(i) notes the contents of this report. 
(ii) approves the proposed adjustments to the six-year Composite Capital
Budget 2022/23 to 2027/28 set out in Sections 5 and 6 of this report
and summarised in Appendices I and II. 
(iii) approves the proposed adjustments to the Housing Investment
Programme Budget 2022/23 to 2026/27 set out in Section 7 of this
report and summarised in Appendix III. 
(iv) notes progress with the delivery of major Capital projects as
summarised in Appendix IV. 
3. STRUCTURE 
This report is structured over the following sections: 
• Section 4: Background
• Section 5: Composite Capital Programme – Gross Capital Resources
• Section 6: Composite Capital Programme – Expenditure
• Section 7: Housing Investment Programme
• Section 8: Summary 
4. BACKGROUND / MAIN ISSUES 
4.1 The Finance & Resources Committee approved an updated six-year gross
Composite Capital Budget for 2022/23 to 2027/28 totalling £696,021,000 and
7
Page 49 of 102

Page 50

a five-year gross Housing Investment Programme for 2022/23 to 2027/28
totalling £84,018,000 at its meeting on 1 February 2023 (report 23/31 refers). 
4.2 At is meeting on 1 March 2023, the Council approved a revised Composite
Capital Budget for the 5 years 2023/24 to 2027/28 (report 23/73 refers). The
total gross budget for the 6 years, after including 2022/23, totalled
£727,565,000. 
4.3 This report advises on expenditure to 28 February 2022, and the latest
estimate of the projected outturn for each of the years to 2027/28 for the
Composite Programme and to 2026/27 for the Housing Investment
Programme. 
5. COMPOSITE CAPITAL PROGRAMME – GROSS CAPITAL RESOURCES 
5.1 On 1 March 2023 the Council approved a revised Composite Capital Budget
totalling £727,565,000, including 2022/23, which reflected an increase in
resources of £31,544,000 from the Budget approved on 1 February 2023. All
approved movements in resources and expenditure have been included in
Appendices I and II of this report and are summarised in the table below: 
Increase in Gross Expenditure: £’000
Increase in budget - Blairgowrie Recreation Centre 9,300
Contribution to phase 1 enabling works - Perth Eco Innovation
Park (Gross: £10 million plus forecast receipts)
11,731
Garry Viaduct 4,400
Bridges & Structures 2,000
Roads Structural Maintenance 2,000
New Gypsy Traveller Site 2,000
Council Property – Decarbonisation 2,000
Free School Meals (FSM) 2,435
Increased funding for Cycling Walking & Safer Streets 472
Other - Mosaic System, SEEMiS & A977 Upgrade 1,630
Collections Store – removed (6,424)  
Total Increase in Gross Expenditure 31,544  
Funded By: 
Increase in General Capital Grant (Pay Award, FSM, CWSR,
General Allocation)
(6,382)
Perth Eco Innovation Park – Contributions & Receipts (1,731)
Increase in Other Receipts & Contributions (140)  
Increase in Borrowing 23,291 
5.2 As a result of ongoing monitoring of the programme, further adjustments to
the budget are proposed. The current estimated total gross capital resources
(which includes movements in Capital Receipts, Capital Grants, Contributions
and borrowing) available over the six years 2022/23 to 2027/28 now amount
Page 50 of 102

Page 51

to £727,448,000. Movements from the revised Composite Capital Budget
approved on 1 March 2023 are summarised in the table below, and the
constituent elements for each year are shown in Appendix I. 
Total Gross Composite Capital Resources 
Approved 
1 March 2023
Current
Estimate
Movement
£’000 £’000 £’000
2022/23 126,524 113,845 (12,679)
2023/24 192,880 198,729 5,849
2024/25 182,661 193,284 10,623
2025/26 111,465 109,577 (1,888)
2026/27 67,816 65,408 (2,408)
2027/28 46,219 46,605 386
Total 727,565 727,448 (117) 
5.3 The overall movement in the total Gross Resources for the 6 years 2022/23 to
2027/28 since 1 March 2023 shown at Section 5.2 above can be summarised
as follows: 
£’000
Net Increase in Capital Grants (Section 5.4) 656
Increase in Third Party and Revenue Contributions (Section 5.5)  431
Net Increase in Receipts  24
Reduction in Borrowing Requirement (Section 5.6 and 5.7) (1,228)
Reduction in Gross Capital Resources (Section 5.2) (117) 
5.4 The final Local Government Finance Circular issued on 1 March 2023 reflects
a reduction of £13,000 in the Council’s General Capital Grant in 2023/24 from
the indicative amount included in the provisional settlement issued in
December 2022. Consequently, the estimated borrowing has been increased
by a corresponding amount. There is also an increase in specific Scottish
Government Grants, with an additional £310,000 for Cycling Walking & Safer
Streets (Section 6.3.3) and £359,000 for the Recycling Improvement Fund
(Section 6.3.12).  
5.5 There are various movements between years in Third Party Contributions with
an overall increase of £105,000, relating to Breadalbane Community Campus
pitch upgarde (£29,000 Section 6.2.5), Cycling Walking & Safer Streets
(£15,000 Section 6.3.3) and Auchterarder Public Park (£61,000 Section
6.3.11). There is also an increase of £326,000 in Revenue Contributions.
These relate to the Almondbank Flood Protection Scheme (£54,000, Section
6.3.7), the Town Centre Fund programme (£23,000, Section 6.3.9) and the
implementation of the Mosaic Social Work System (£249,000, Section 6.4.5). 
5.6 The projected Borrowing Requirement in 2022/23, which is effectively the
balancing item for resources, is £71,264,000. This is £12,262,000 lower than
the Borrowing Requirement approved on 1 March 2023, and mainly reflects
the revised phasing of the Cross Tay Link Road (CTLR). 
Page 51 of 102

Page 52

5.7 The total Borrowing Requirement in the subsequent years 2023/24 to 2027/28
has increased by £11,034,000 to £491,829,000, resulting in a reduction of
£1,228,000 across the whole 6-year programme. The movement in borrowing
is summarised as follows: 
2022/23 2023/24 2024/25 Later 
Years
Total 
£’000 £’000 £’000 £’000 £’000
Reduction in General Capital
Grant (Section 5.4) 0 13 0 0 13
(Decrease)/Increase in CTLR
expenditure (Section 6.3.6) (14,493) 12,638 1,855 0 0
(Decrease) in Communities LED
Street Lighting Prudential
Borrowing (Section 6.3.15)
(120) (177) (66) (878) (1,241)
Movements arising from re-
phasing of other expenditure and
receipts (Appendix II)
2,351 (7,904) 8,710 (3,157) 0
(Decrease)/Increase in
Borrowing Requirement (12,262) 4,570 10,499 (4,035) (1,228) 
5.8 The chart below shows the Capital Resources required to fund the 2022/23
Composite Capital Programme following the proposed budget adjustments
detailed in this report. 
6. COMPOSITE CAPITAL PROGRAMME – EXPENDITURE 
6.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme 
6.1.1 Total expenditure (net of grants and contributions) to 28 February 2023 on the
Composite Capital Programme amounts to £67,104,000, which is detailed in
Appendix II and summarised as follows:
62.6%
32.2% 0.6%
1.4%
2.9%
0.5%
5.2%
Projected Capital Resources 2022/23
(March 2023)
Borrowing (£71.264M)
Grants (£36.620M)
Tay City Deal (£0.634M)
Developer Contributions (£1.549M)
Third Party & Revenue Contributions (£3.248M)
Receipts (£0.530M)
£Million
Page 52 of 102

Page 53

Net Expenditure
to 28 Feb 2023
£’000
Education & Children’s Services  16,150
Communities 45,101
Health and Social Care 615
Corporate & Democratic Services 5,238
Total 67,104 
6.1.2 All the additional expenditure and budget adjustments for each year approved
by the Council at its meeting on 1 March 2023 are shown in Appendix II. A
comprehensive monitoring exercise has since been carried out, which is
detailed in Appendix II. The most significant features are discussed below. 
6.2 Education and Children’s Services 
6.2.1 The Executive Director (Education & Children’s Services) has reviewed the
programme for their Service with the following movements to report at this
time. 
6.2.2 Following the Council approving a revised budget of £36 million for the new
Blairgowrie Recreation Centre on 1 March 2023, the project is now working
towards financial close. Financial close and commencement of the works is
anticipated for late May 2023 with the new facility expected to be open in
December 2024, with phase 2 external works completed by the summer 2025.
The spend profile has been rephased in line with the works programme and
the revised budgets for each year are detailed in Appendix II. 
6.2.3 Within the Investment in the Learning Estate (IILE) budget, works in schools
have been progressing at pace with additional suitability improvements having
taken place over the past few months. It is, therefore, proposed to accelerate
£325,000 from 2024/25 into 2022/23 to cover these works. Due to the phasing
of projects at Methven Primary and Braco Primary Schools it is proposed that
the IILE budget is reprofiled accordingly with £3,900,000 being moved from
2023/24 into 2025/26 (£1,900,000) and 2026/27 (£2,000,000). 
6.2.4 Within the Free School Meals Expansion Programme, it is anticipated that the
majority of works will take place in 2024/25. It is, therefore, proposed that
£2,000,000 of the budget in 2023/24 is moved to 2024/25. 
6.2.5 The Scottish Football Association has awarded a grant of £28,865 to upgrade
the pitch at Breadalbane Community Campus in 2023/24. Therefore, this
project has been included in Appendix II along with the third-party
contribution. Upgrade works at Kirkmichael Primary School are nearing
completion and it is proposed that both the remaining budget and the ring-
fenced capital receipt funding these works is rephased into 2023/24. With the
New Primary School for North/West Perth not due to open until August 2026,
only initial fees of £39,000 will be incurred in 2022/23 and it is proposed that
£61,000 of the budget is moved to 2023/24. 
Page 53 of 102

Page 54

6.2.6 The construction of Riverside Primary School is in the final stages. There has
been a minor delay against the programme, but the school remains on target
to open in mid-June. The forecast spend in 2022/23 is, therefore, lower than
previously expected and £790,000 requires to be rephased from 2022/23 into
2023/24 in line with the updated programme.   
6.2.7 Upgrade works at Perth Academy and Perth Grammar Schools are
progressing well and it is proposed that budgets for both projects are
accelerated with £297,000 for Perth Academy and £237,000 for Perth
Grammar advancing from 2023/24 to 2022/23. 
6.2.8 Following the financial close of the project to replace Perth High School,
works have commenced on site in February 2023. It was previously expected
that the works on site would not commence until April 2023, therefore,
£4,200,000 of the budget has been brought-forward from 2023/24 into
2022/23. 
6.2.9 All of the above proposed adjustments have been reflected in Appendix II. 
6.3 Communities 
6.3.1 The Executive Director (Communities) has reviewed the programme for their
Service and proposes various budget adjustments, the most significant of
which are described below. 
6.3.2 Within Traffic & Road Safety, due to limited staff capacity, the team are
focusing on the delivery of grant funded projects where funding is time limited.
The Road Safety initiatives budget for 2023/24 has, therefore, required to be
rephased over 2024/25 to 2027/28. 
6.3.3 The Scottish Government has allocated a further £310,000 to the Council for
the Cycling Walking & Safer Routes (CWSR) programme in 2023/24 together
with a £15,000 increased contribution from TACTRAN. The budget for School
Road Safety Measures in 2023/24 has, therefore, increased by a total of
£301,000 with £195,000 brought forward from 2022/23 and £106,000 funded
from the CWSR allocation. 
6.3.4 Within Asset Management – Roads & Lighting, the planned investment in
Local Footpath lighting has had to be reviewed with £100,000 rephased from
both 2023/24 and 2024/25 and moved into 2025/26 and 2026/27. 
6.3.5 Within Asset Management – Bridges, following the allocation by Council of an
additional £2,000,000 budget for the Bridge Refurbishment Programme in
March, it is proposed that this is phased over 2023/24, 2024/25 and 2025/26.
Work on Dalhenzean Culvert, Dunkeld Golf Course and Tullyfergus Bridge
are now unlikely to be completed in 2023/24 and it is proposed that the
budgets for these projects are moved to 2027/28. 
6.3.6 The contractor for the Cross Tay Link Road (CTLR) has provided an update to
the expenditure profile with adjustments to the order in which work is
expected to be complete, resulting in an estimated reduction in expenditure in
Page 54 of 102

Page 55

2022/23 of £14,493,000. This also includes provision incorporated into the
2022/23 budget for construction risk and compensation events which have not
yet been fully utilised. It is therefore proposed that £12,638,000 is moved to
2023/24 and £1,855,000 moved into 2024/25. Delivery of the CTLR remains
on schedule. 
6.3.7 Within the budget for Flood Protection Schemes, a Revenue Contribution
towards the final costs on the Almondbank Flood Protection Scheme of
£54,000 has been made and the scheme budget adjusted accordingly. The
Perth Flood Protection Scheme pump replacement project has been
completed and it is proposed that the remaining budget of £161,000 is applied
towards the South Inch Culvert Reinstatement, with £35,000 in 2022/23 and
£126,000 in 2023/24.  It is also proposed to transfer a further £225,000 to the
project in 2023/24 from Structural Maintenance. The schemes at Comrie,
South Kinross and Scone also require to be rephased, which is detailed in
Appendix II. 
6.3.8 Within the Perth & Kinross Place-making programme, following the decision of
the Council on 1 March 2023, the Perth & Kinross Lighting Action Plan has
been rephased to reflect existing commitments, with a further report on the
project to be submitted to the Environment, Infrastructure and Economic
Development Committee in May 2023. 
6.3.9 Within Other Planning Projects, it is proposed to allocate £63,000 towards the
Coupar Angus Strathmore Community Hub by utilising £40,000 of the Scottish
Government Town Centre Grant and a £23,000 Revenue Contribution. The
Low Carbon Transport Hub project has been rephased between 2022/23 and
2023/24 in line with the anticipated spend. 
6.3.10 Within City Centre Developments, the Perth Museum project is progressing
well and is currently on budget and on track for opening in 2024.
Consequently, an accelerated expenditure profile has been received from the
contractor and £1,714,000 has been accelerated from 2023/24 into 2022/23. 
6.3.11 Within Community Greenspace, Play Areas –the budget for 2023/24 will not
be utilised in full, £400,000 of the budget has been moved from 2023/24 into
2024/25. As the priority in 2023/24 has been placed on improvements to Play
Areas, the projects for Countryside Sites and Community Greenspace Sites
will not progress in 2023/24 and it is therefore proposed that these budgets
are rephased across subsequent years of the programme. Also, within
Community Greenspace, a further £61,000 contribution has been provided
from the community towards the project at Auchterarder Public Park and the
expenditure budget has been increased accordingly. 
6.3.12 Within Waste Strategy, due to inflation increasing the costs of the additional
bins required for the dual stream recycling due to be implemented in 2023,
additional grant of £77,000 in 2022/23 and £282,000 in 2023/24 from the
Recycling Improvement Fund has been secured which is now reflected within
the budget. 
Page 55 of 102

Page 56

6.3.13 Within Support Services, multi-year IT licences require to be accounted for in
full at the start of the period covered by the new licence and £163,000 has
been moved into 2022/23 with corresponding adjustments to the budgets for
future years as detailed in Appendix II. 
6.3.14 A number of adjustments require to be made to the budgets for Prudential
Borrowing Projects. The Street Lighting Renewal project, which involves LED
lighting and column replacement, will not be completed as budgeted due to
the capacity to carry out the works. As a result, it is proposed to reduce the
project by £1,241,000 in total over the six years of the current Capital plan as
set out in Appendix II to better reflect the likely delivery of works. The
redevelopment of 1-5 High Street into a boutique hotel is unlikely to be
progressed by the developer in 2023/24 because of currently high
construction inflation. The Council’s approved £1,900,000 contribution
towards the agreed heritage works, therefore, requires to be rephased into
2024/25 and 2025/26. 
6.3.15 All the above proposed adjustments, together with various other small
movements, have been reflected in Appendices I & II. 
6.4 Corporate & Democratic Services 
6.4.1 The Chief Operating Officer has reviewed the programme for their Service
and proposes the following adjustments described below. 
Property Services 
6.4.2 Upgrades to Pitlochry High School were delayed to allow electrical
compliance works to be carried out (Report 23/31 refers). Work has now
recommenced, however, access restrictions to some areas due to their
continued use for learning means some works will not be undertaken until the
summer holidays. Consequently, £170,000 in 2022/23 has been moved into
2023/24. 
Information Systems & Technology 
6.4.3 Within the ICT Infrastructure & Replacement and Upgrade programme,
£362,000 of network equipment will be delivered in June 2023 and will require
to be accounted for in 2023/24 with the budget adjusted accordingly. 
6.4.4 Within the School AV Programme, £100,000 has been rephased into 2023/24
to allow works to be undertaken over the school holiday period. 
6.4.5 Following the approval of an additional allocation of £442,000 by the Council
in March, the Mosaic social care system project has been extended to
2025/26 to enable ongoing support and development after the go-live date of
March 2024. This includes some rephasing of the estimated expenditure each
year. The budget is also enhanced by Revenue Contributions in 2024/25
(£124,000) and 2025/26 (£125,000) following the conclusion of the previous
supplier contract. 
Page 56 of 102

Page 57

6.4.6 All the above proposed adjustments, together with other small movements
have been reflected in Appendices I & II. 
6.5 Health & Social Care 
6.5.1 The Enabled Telecare project to upgrade the community alarm system to
digital is underway. However, due to difficulty in obtaining stock from
suppliers, the pace of upgrades has been slower than originally planned. It is
anticipated that upgrades will continue at an increased pace over the next
year and £550,000 of the budget has, therefore, been rephased into 2023/24. 
6.5.2 The above adjustment has been reflected in Appendix II. 
Major Capital Projects 
6.5.3 Appendix IV to the report shows progress on the delivery of major Capital
projects within the approved Capital programme. The appendix summarises
budgeted expenditure and the current projected outturn on these projects;
their anticipated completion date; current status and any significant changes
since the last monitoring report. 
7. HOUSING INVESTMENT PROGRAMME 
7.1 The current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2022/23 to 2026/27 amounts to
£87,018,000. This has increased by £3,000,000 following the approval of the
revised Housing Investment Programme by the Housing & Social Wellbeing
Committee on 25 January 2023 (report 23/9 refers) which allocated a further
£3,000,000 to the Council House Buy-Back Programme in 2026/27.
Movements from the previous estimates approved by this Committee on 1
February 2023 are summarised in the table below and detailed in Appendix III. 
Approved 
1 Feb 2023
Current
Estimate
Movement
£’000 £’000 £’000
2022/23 18,990 18,180 (810)
2023/24          16,457          20,422 3,965
2024/25 13,858 13,853 (5)
2025/26 18,669 15,519 (3,150)
2026/27 16,044  19,044  3,000
Total 84,018 87,018 3,000 
7.2 The Housing & Social Wellbeing Committee also approved a new budget for
2027/28 amounting to £19,044,000. This will be included in the first monitoring
report for 2023/24 in September 2023. 
7.3 Total Expenditure to 28 February 2023 (Housing Investment Programme) 
Net expenditure for 2022/23 to 28 February 2023 amounts to £10,531,000
and receipts amount to £9,000. This therefore means that the borrowing
requirement for the year to date is £10,522,000. 
Page 57 of 102

Page 58

7.4 £218,000 on the New Build Programme at Lynedoch Road, Methven has
been accelerated from 2023/24 into 2022/23 reflecting progress made on the
construction work. The Council House Buy-Backs budget has been increased
by £822,000 to reflect the additional properties purchased in 2022/23. As a
result, an extra £210,000 of Scottish Government grant has been awarded in
2022/23, with the balance of £612,000 being brought forward from the
2023/24 budget. 
7.5 It is proposed to bring forward and allocate £3,150,000 of the SHQS Future
Developments Budget in 2025/26 to various projects as follows: 
• Triple Glazing, with £200,000 in 2022/23 and £2,500,000 in 2023/24,
following the award of a new windows contract under Phase 4 of the
programme.
• Bathroom Modernisation Programme, with £400,000 required in 2022/23
to meet additional Occupational Therapy referrals.
• Sheltered Housing, with £30,000 required in 2022/23 for the Fire Alarm
Replacement at Carpenter Court, Perth. A further £5,000 is required in
2022/23 for boiler upgrades to allow remote monitoring, with this amount
being accelerated from the 2024/25 budget for Sheltered Housing. 
7.6 Expenditure on the following programmes has been accelerated from 2023/24
into 2022/23: 
• Kitchen Modernisation Programme - £50,000 to cover additional kitchen
renewals.
• External Fabric - £400,000, to cover additional properties identified from
the Tennant Management Scheme. 
7.7 The review of the programme has also identified some areas where budgets
in 2022/23 have required to be moved into 2023/24 to reflect planned levels of
work: 
• Central Heating & Rewiring works - £142,000. The main contract was
completed on 31 March 2023, whilst the budget allocation included an
element of ad-hoc boiler replacements and re-wiring works which are to be
rephased into 2023/24.
• Anchor House, Rannoch Road, Perth - £100,000, due to additional works
on the walkway delaying the main programme works, which is still to be
finalised. 
• Shops & Offices - £186,000, with no works identified in 2022/23.
• Upgrade & Replacement Lift Programme - £139,000, with no further works
planned for 2022/23.
• ICT Expenditure - £178,000, with no required expenditure in 2022/23. 
7.8 The revised level of Capital Funded from Current Expenditure (CFCR)
approved by the Housing & Wellbeing Committee in setting the Housing
Revenue Account budget in January 2023, together with the additional
£3,000,000 allocated to Council House Buy-Back has increased the borrowing
requirement for the overall programme by a net £8,287,000 to £75,625,000. 
Page 58 of 102

Page 59

8. SUMMARY 
8.1 The projected net expenditure outturn in 2022/23 for the Composite Capital
Budget is £87,960,000 and represents 64% of the 2022/23 budget as
approved on 20 April 2022 (£138,276,000). This reflects the adjustments
outlined within this report and the rephasing of the expenditure profile for
major projects since the Capital budget for 2022/23 was originally set in April
2022. 
8.2 Net expenditure to 28 February 2023 on the Composite Capital Budget is
£67,104,000 and represents 76% of the forecast revised budget for 2022/23
of £87,960,000. However, actual expenditure to 28 February 2023 shown
above does not include accrued expenditure or provision for works certified as
completed by that date. All such expenditure is accounted for when preparing
the final outturn as at 31 March 2023. 
8.3 The projected net expenditure outturn in 2022/23 for the Housing Investment
Programme is £18,180,000 and represents 101% of the 2022/23 budget
approved on 20 April 2022 (£17,963,000). 
8.4 Net expenditure to 28 February 2023 on the Housing Investment Programme
is £10,531,000, subject to the same caveat outlined above for the Composite
Programme, which represents 58% of the forecast revised budget for 2022/23
of £18,180,000. 
8.5 A summary of the major capital projects included with the Council’s
Composite Capital Budget and Housing Investment Programme and their
current status is included at Appendix IV. 
Author(s)
Name  Designation Contact Details
John Jennings  Senior Accountant  CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date
Karen Donaldson 
Stewart MacKenzie 
Chief Operating Officer 
Head of Finance
14 April 2023 
14 April 2023 
Page 59 of 102

Page 60

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 60 of 102

Page 61

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Chief Executive and the Executive Directors have been consulted in the
preparation of this report.   
Page 61 of 102

Page 62

2. BACKGROUND PAPERS 
No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix I – Composite Capital Programme - Estimated Capital
Resources 2022/23 to 2027/28
• Appendix II – Composite Capital Programme - Summary of Capital
Resources and Expenditure 2022/23 to 2027/28        
• Appendix III – HRA Capital Investment Programme – Summary of
Capital Resources and Expenditure 2022/23 to 2026/27 
• Appendix IV – Significant Capital Projects Progress Update
Page 62 of 102

Page 63

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2022/23 to 2027/28
APPENDIX I
Capital Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources Resources
2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
Capital Grants
Cycling, Walking & Safer Routes (CWSR) 973 982 200 200 200 200 2,755
Town Centre Fund 26 0 0 0 0 0 26
Regeneration Fund 524 0 0 0 0 0 524
Recycling Improvement Fund 358 2,363 0 0 0 0 2,721
Cross Tay Link Road - Transport Scotland 20,000 15,000 0 0 0 0 35,000
General Capital Grant 14,739 22,147 13,847 12,639 12,150 12,150 87,672
Total Capital Grants 36,620 40,492 14,047 12,839 12,350 12,350 128,698
General Capital Receipts
General Fund - Capital Receipts 8 972 250 250 250 250 1,980
General Fund - Ring Fenced Receipts 122 372 377 377 927 1,072 3,247
Total General Capital Receipts 130 1,344 627 627 1,177 1,322 5,227
Commercial Property Receipts
Capital Receipts brought-forward 2,556 2,157 1,006 2,685 2,993 2,993 2,556
Commercial Property Capital Receipts 1 243 1,679 308 0 0 2,231
Capital Receipts carried-forward (2,157) (1,006) (2,685) (2,993) (2,993) (2,993) (2,993)
Total Commercial Property Receipts Applied 400 1,394 0 0 0 0 1,794
Contributions
Tay Cities Deal 634 1,171 999 550 505 1,956 5,815
Third Party Contributions 2,434 709 0 0 2,000 3,000 8,143
Developer Contributions 1,549 2,100 2,300 2,367 2,600 2,600 13,516
Revenue Budget Contributions 814 99 124 125 0 0 1,162
Total Contributions 5,431 4,079 3,423 3,042 5,105 7,556 28,636
Capital Borrowing Requirement 71,264 151,420 175,187 93,069 46,776 25,377 563,093
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 113,845 198,729 193,284 109,577 65,408 46,605 727,448
7
Page 63 of 102

Page 64

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2022/23 to 2027/28
APPENDIX I
Movements in Resources from Approved Budget - 1 March 2023
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Increase/(Decrease) in:
Capital Receipts - General Fund (38) 38 0 0 0 0 0
Capital Receipts - Commercial Property (342) (710) 1,054 0 0 0 2
Capital Receipts - Ring Fenced (172) 172 0 0 0 0 0
Capital Grants:
Cycling, Walking & Safer Routes (CWSR) 0 310 0 0 0 0 310
Road Safety Improvement Fund 0 0 0 0 0 0 0
Free School Meals Expansion 0 0 0 0 0 0 0
Regeneration Fund 0 0 0 0 0 0 0
Recycling Improvement Fund 77 282 0 0 0 0 359
Town Centre Fund 0 0 0 0 0 0 0
Cross Tay Link Road - Transport Scotland 0 0 0 0 0 0 0
General Capital Grant 0 (13) 0 0 0 0 (13)
Tay Cities Deal (100) 100 0 0 0 0 0
Third Party Contributions (36) 141 0 0 0 0 105
Revenue Contributions 77 0 124 125 0 0 326
Developer Contributions 0 0 0 0 0 0 0
Resources b/f 0 (117) (1,076) (22) (22) (22) (1,259)
Resources c/f to future years 117 1,076 22 22 22 22 1,281
Borrowing Requirement (12,262) 4,570 10,499 (2,013) (2,408) 386 (1,228)
Total Increase/(Decrease) in Resources (12,679) 5,849 10,623 (1,888) (2,408) 386 (117)
Approved Resources 1 March 2023 126,524 192,880 182,661 111,465 67,816 46,219 727,565
Revised Resources 113,845 198,729 193,284 109,577 65,408 46,605 727,448
Page 64 of 102

Page 65

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Approved Approved Proposed Revised Actuals Projected Approved Approved Proposed Revised Approved Approved Proposed Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget
01-Feb-23 Adjustment Adjustment 28-Feb-23 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment
01-Mar-23 Report 4 Report 4 01-Mar-23 Report 4 Report 4 01-Mar-23 Report 4 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES 30,171 (9,668) 5,030 25,533 16,150 25,533 56,205 11,833 (6,170) 61,868 56,449 150 7,555 64,154
COMMUNITIES 75,268 (7,413) (16,302) 51,553 45,101 51,553 105,103 (13,138) 9,904 101,869 91,413 22,602 2,697 116,712
HEALTH AND SOCIAL CARE 1,332 0 (589) 743 615 743 1,532 0 589 2,121 1,303 0 0 1,303
CORPORATE AND DEMOCRATIC SERVICES 10,795 0 (664) 10,131 5,238 10,131 9,212 2,442 521 12,175 9,168 0 247 9,415
TOTAL NET EXPENDITURE 117,566 (17,081) (12,525) 87,960 67,104 87,960 172,052 1,137 4,844 178,033 158,333 22,752 10,499 191,584
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (14,739) 0 0 (14,739) (15,458) (14,739) (13,128) (9,032) 13 (22,147) (16,371) 2,524 0 (13,847)
DEVELOPER CONTRIBUTIONS (1,549) 0 0 (1,549) 0 (1,549) (2,100) 0 0 (2,100) (2,300) 0 0 (2,300)
CAPITAL RECEIPTS (389) 0 380 (9) (3) (9) (1,887) 0 672 (1,215) (875) 0 (1,054) (1,929)
ANNUAL BORROWING REQUIREMENT 100,889 (17,081) (12,145) 71,663 51,643 71,663 154,937 (7,895) 5,529 152,571 138,787 25,276 9,445 173,508
CAPITAL RECEIPTS BROUGHT FORWARD (2,556) 0 0 (2,556) (2,556) (2,556) (2,274) 0 117 (2,157) (2,082) 0 1,076 (1,006)
CAPITAL RECEIPTS CARRIED FORWARD 2,274 0 (117) 2,157 2,408 2,157 2,082 0 (1,076) 1,006 2,707 0 (22) 2,685
TOTAL NET BORROWING REQUIREMENT 100,607 (17,081) (12,262) 71,264 51,495 71,264 154,745 (7,895) 4,570 151,420 139,412 25,276 10,499 175,187
7
Page 65 of 102

Page 66

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
EDUCATION AND CHILDREN'S SERVICES
COMMUNITIES
HEALTH AND SOCIAL CARE
CORPORATE AND DEMOCRATIC SERVICES
TOTAL NET EXPENDITURE
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT
DEVELOPER CONTRIBUTIONS
CAPITAL RECEIPTS
ANNUAL BORROWING REQUIREMENT
CAPITAL RECEIPTS BROUGHT FORWARD
CAPITAL RECEIPTS CARRIED FORWARD
TOTAL NET BORROWING REQUIREMENT
Approved Approved Proposed Revised Approved Approved Proposed Revised Approved Approved Proposed Revised
Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment
01-Mar-23 Report 4 Report 4 01-Mar-23 Report 4 Report 4 01-Mar-23 Report 4 Report 4
2025/26 2025/26 2025/26 2025/26 2026/27 2026/27 2026/27 2026/27 2027/28 2027/28 2027/28 2027/28
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
35,900 9,818 (3,915) 41,803 17,504 150 (2,350) 15,304 6,823 150 (150) 6,823
42,419 13,166 2,006 57,591 37,370 945 (58) 38,257 27,321 (1,836) 536 26,021
1,303 0 0 1,303 1,303 0 0 1,303 1,319 0 0 1,319
7,732 0 (104) 7,628 6,912 0 0 6,912 6,214 0 0 6,214
87,354 22,984 (2,013) 108,325 63,089 1,095 (2,408) 61,776 41,677 (1,686) 386 40,377
(13,007) 368 0 (12,639) (12,265) 115 0 (12,150) (12,265) 115 0 (12,150)
(2,367) 0 0 (2,367) (2,600) 0 0 (2,600) (2,600) 0 0 (2,600)
(558) 0 0 (558) (250) 0 0 (250) (250) 0 0 (250)
71,422 23,352 (2,013) 92,761 47,974 1,210 (2,408) 46,776 26,562 (1,571) 386 25,377
(2,707) 0 22 (2,685) (3,015) 0 22 (2,993) (3,015) 0 22 (2,993)
3,015 0 (22) 2,993 3,015 0 (22) 2,993 3,015 0 (22) 2,993
71,730 23,352 (2,013) 93,069 47,974 1,210 (2,408) 46,776 26,562 (1,571) 386 25,377
Page 66 of 102

Page 67

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
EDUCATION AND CHILDREN'S SERVICES
COMMUNITIES
HEALTH AND SOCIAL CARE
CORPORATE AND DEMOCRATIC SERVICES
TOTAL NET EXPENDITURE
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT
DEVELOPER CONTRIBUTIONS
CAPITAL RECEIPTS
ANNUAL BORROWING REQUIREMENT
CAPITAL RECEIPTS BROUGHT FORWARD
CAPITAL RECEIPTS CARRIED FORWARD
TOTAL NET BORROWING REQUIREMENT
Revised
Budget
Report 4
(£'000)
215,485
392,003
8,092
52,475
668,055
(87,672)
(13,516)
(4,211)
562,656
(2,556)
2,993
563,093
Page 67 of 102

Page 68

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Approved Proposed Revised Revised Approved Proposed Revised Revised Approved Proposed
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-23 Adjustment Adjustment Adjustment Adjustment Adjustment Adjustment
Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES
MIS - Procurement & Integration 55 2 57 57 57 49 (49) 0 0 0 0
MIS - SEEMIS Licensing 0 0 0 0 98 647 745 0 150 (150) 0 0 150 (150)
Blairgowrie Recreation Centre - Replacement 9,868 (9,668) 500 700 103 700 8,435 9,300 (435) 17,300 6,600 5,600 12,200 0 9,668 (5,665)
Schools Modernisation Programme
Investment in the Learning Estate 975 325 1,300 1,088 1,300 4,904 (3,900) 1,004 11,013 (325) 10,688 6,650 1,900
Free School Meal Expansion Programme 913 913 913 0 2,435 (2,000) 435 0 2,000 2,000 0
Methven Primary School Refurbishment 311 (31) 280 219 280 0 31 31 250 250 0
Breadalbane Academy, Aberfeldy - 3G Pitch 0 0 0 0 29 29 0 0 0
Third Party Contribution (The Scottish Football Association) 0 0 0 0 (29) (29) 0 0 0
Kirkmichael Primary School Upgrades 98 (7) 91 91 91 0 7 7 0 0 0
Capital Receipt (ring-fenced) (100) 100 0 0 0 (100) (100) 0 0 0
Early Learning & Childcare 38 38 38 38 0 0 0 0 0 
- Letham Primary School Upgrade Project 19 19 19 0 0 0 0 0 
- Rattray Primary School Upgrade Project 1,345 300 1,645 1,431 1,645 470 (300) 170 0 0 0
North/West Perth - New Primary School 100 (61) 39 39 1,000 61 1,061 7,500 7,500 15,000
Riverside Primary New School 12,018 (790) 11,228 9,534 11,228 2,635 790 3,425 0 0 0
Technology Upgrades 45 (30) 15 15 15 800 (400) 400 586 430 1,016 0
Perth Academy - Refurbishment 1,368 297 1,665 1,409 1,665 1,812 (297) 1,515 2,500 2,500 2,150
Perth Grammar School - Upgrade Programme Phase 3 361 237 598 427 598 1,700 (237) 1,463 1,500 1,500 1,500
Perth High School - Internal Services & Refurbishment 21 (12) 9 9 9 0 12 12 0 0 0
Perth High School - New School Investment 1,636 4,200 5,836 1,147 5,836 30,300 30,300 26,500 26,500 10,600
Harris Academy/Invergowrie - Extension 1,100 1,100 582 1,100 4,100 4,100 0 0 0
TOTAL: EDUCATION AND CHILDREN'S SERVICES 30,171 (9,668) 5,030 25,533 16,150 25,533 56,205 11,833 (6,170) 61,868 56,449 150 7,555 64,154 35,900 9,818 (3,915)
COMMUNITIES
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..) 0 0 0 512 (512) 0 335 27 362 200 162
Additional Road Safety - Pedestrian Crossings 0 0 0 175 175 175 175 175
Schools Road Safety Measures 440 (195) 245 222 245 106 301 407 0 0 0
Scottish Government Grant - CWSS 0 (106) (106) (106) 0 0 0 0 0
20mph Signage Programme - Schools 111 111 15 111 89 89 0 0 0
20mph Signage Programme 0 0 0 76 76 0 0 0
Cycling Walking & Safer Routes (CWSR) 1,078 (91) 987 488 987 200 472 310 982 200 200 200
Scottish Government Grant - CWSR (973) 106 (867) (171) (867) (200) (472) (310) (982) (200) (200) (200)
Third Party Contribution (TACTRAN) (105) (15) (120) (120) 0 0 0 0 0
Car Parking Investment 45 45 13 45 277 277 0 0 0
Car Parking Investment - Pitlochry 0 0 0 150 150 0 0 0
Strathmore Cycle Network 0 0 0 84 (84) 0 0 0 0 84
Sub-Total 596 0 (301) 295 567 295 1,469 0 (295) 1,174 510 0 27 537 375 0 246
Asset Management - Roads & Lighting
Structural Maintenance 13,770 13,770 10,910 13,770 9,541 2,000 (225) 11,316 9,593 9,593 9,593
Third Party Contribution (Forestry Commission Timber Routes) (1,316) (1,316) (473) (1,316) 0 0 0 0 0
Traffic Signal Renewals - Upgrading 199 (94) 105 101 105 0 94 94 0 0 0
Third Party Contributions (3) (3) (3) 0 0 0 0 0
Footways 524 524 481 524 435 435 435 435 435
Third Party Contributions 0 0 (2) 0 0 0 0 0 0
Investment in Local Footpaths 0 0 0 100 (100) 0 100 (100) 0 0 100
Road Safety Barriers 10 10 11 10 23 23 0 0 0
Sub-Total 13,184 0 (94) 13,090 11,028 13,090 10,099 2,000 (231) 11,868 10,128 0 (100) 10,028 10,028 0 100
Asset Management - Bridges
Bridge Refurbishment Programme 688 (59) 629 346 629 2,312 2,000 (743) 3,569 1,471 658 2,129 1,341 104
Dalhenzean Culvert 43 43 43 264 (264) 0 0 0 0
Dunkeld Golf Course 27 2 29 29 0 0 219 (219) 0 0
Vehicular Bridge Parapets Programme - Assess & Upgrade 0 0 0 29 (29) 0 0 29 29 0
Old Perth Bridge - Strengthening 10 10 10 180 180 10 10 2,369
Perth Queens Bridge - Strengthening 0 0 0 385 (50) 335 10 50 60 70
Garry Viaduct 0 0 0 0 110 110 0 300 300 0 300
Culteuchar Culvert 42 42 1 42 357 38 395 0 0 0
Glendevon Bridge 235 235 210 235 0 0 0 0 0
Tullyfergus Bridge 0 0 0 134 (134) 0 0 0 0
Sub-Total 1,045 0 (57) 988 557 988 3,661 2,110 (1,182) 4,589 1,710 300 518 2,528 3,780 300 104
Page 68 of 102

Page 69

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Approved Proposed Revised Revised Approved Proposed Revised Revised Approved Proposed
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-23 Adjustment Adjustment Adjustment Adjustment Adjustment Adjustment
Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Improvement Schemes
A9/A85 Road Junction Improvements 359 359 40 359 0 0 0 0 0
Cross Tay Link Road (CTLR) 51,802 (14,493) 37,309 28,264 37,309 57,543 12,638 70,181 24,358 1,855 26,213 0
Scottish Government Grant (20,000) (20,000) (10,000) (20,000) (15,000) (15,000) 0 0 0
A977 Upgrades 20 (20) 0 0 170 350 20 540 0 0 0
Brioch Road, Crieff - Road Realignment & Safety Measures 0 0 0 31 31 0 0 0
Sub-Total 32,181 0 (14,513) 17,668 18,304 17,668 42,744 350 12,658 55,752 24,358 0 1,855 26,213 0 0 0
Rural Flood Protection Schemes
Almondbank Flood Protection Scheme 39 54 93 73 93 0 0 0 0 0
Revenue Contribution 0 (54) (54) (54) 0 0 0 0 0
Perth Flood Protection Scheme (Pump Replacement) 25 (25) 0 28 0 136 (136) 0 0 0 0
Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 0 35 35 35 0 351 351 0 0 0
Comrie Flood Protection Scheme 2,096 (249) 1,847 1,636 1,847 7,198 197 7,395 16,789 52 16,841 0
Milnathort Flood Protection Scheme 112 112 16 112 52 52 1,590 1,590 0
South Kinross Flood Protection Scheme 146 (31) 115 47 115 309 (69) 240 1,118 50 1,168 1,737 50
Scone Flood Protection Scheme 51 (46) 5 5 257 (167) 90 416 (340) 76 48 553
Coastal Change Adaptation 0 0 0 100 100 0 0 0
Sub-Total 2,469 0 (316) 2,153 1,800 2,153 8,052 0 176 8,228 19,913 0 (238) 19,675 1,785 0 603
Perth & Kinross Place-making
Mill Street Environmental Improvements 127 (127) 0 0 0 127 127 0 0 0
Perth, Place, People 0 0 0 3,629 (30) 3,599 0 0 0
Perth City Centre Golden Route (Rail Station) 0 15 15 15 0 15 15 0 0 0
City Greening 31 (31) 0 0 0 31 31 0 0 0
Perth & Kinross Lighting Action Plan 1,075 (200) 875 635 875 1,047 (1,047) 1,200 1,200 630 1,047 (1,000) 677 0
Sub-Total 1,233 0 (343) 890 635 890 4,676 (1,047) 1,343 4,972 630 1,047 (1,000) 677 0 0 0
Other Planning Projects
Creative Exchange (former St. John's Primary School) 53 53 53 0 0 0 0 0
Town Centre - Regeneration & Economic Improvements 26 26 26 0 0 0 0 0
Scottish Government Grant (26) (40) (66) (66) 0 0 0 0 0
TCF Revenue Contribution 0 (23) (23) (23) 0 0 0 0 0
Local Full Fibre Network 198 (40) 158 55 158 0 0 0 0 0
Third Party Contribution - TCF 0 40 40 40 0 0 0 0 0
Third Party Contribution - Tay Cities Deal (198) (198) (250) (198) 0 0 0 0 0
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 864 (161) 703 709 703 130 161 291 0 0 0
Third Party Contribution - ERDF (327) 61 (266) (266) (49) (61) (110) 0 0 0
Third Party Contribution - Tay Cities Deal (536) 100 (436) (182) (436) (81) (100) (181) 0 0 0
Perth Eco-Innovation Park at Perth West 6,889 (6,889) 0 0 10,661 (7,661) 3,000 3,536 17,264 20,800 0 9,017
Third Party Contributions - Tay Cities Deal 0 0 0 0 (990) (990) (990) (9) (999) (1,899) 1,349
Other Third Party Contributions 0 0 0 0 0 0 0 (2,500) 2,500
Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 0 0 0 0
Coupar Angus - Strathmore Community Hub 0 63 63 63 0 0 0 0 0
Nature Restoration 206 206 17 206 0 0 0 0 0
Sub-Total 7,149 (6,889) 0 260 349 260 10,661 (8,651) 0 2,010 2,546 17,255 0 19,801 (4,399) 12,866 0
City Centre Developments - Cultural Attractions
Perth Museum 9,229 1,714 10,943 9,090 10,943 3,781 (1,714) 2,067 0 0 0
Perth Art Gallery 112 112 112 3,204 3,204 0 0 0
Collections Centre 24 (24) 0 0 6,400 (6,400) 0 0 0 0
PH2O 500 (500) 0 0 3,500 (3,500) 0 26,000 4,000 30,000 25,000
Sub-Total 9,865 (524) 1,714 11,055 9,090 11,055 16,885 (9,900) (1,714) 5,271 26,000 4,000 0 30,000 25,000 0 0
Community Planning
Letham Community Wellbeing Hub 2,552 2,552 1,767 2,552 1,317 1,317 0 0 0
Scottish Government Grant (Regeneration Fund) (524) (524) (524) (524) 0 0 0 0 0
Third Party Contribution (Letham4All) 0 0 0 (519) (519) 0 0 0
Revenue Contribution (Place Based Development Grant) (735) (735) (735) (735) 0 0 0 0 0
Sub-Total 1,293 0 0 1,293 508 1,293 798 0 0 798 0 0 0 0 0 0 0
Page 69 of 102

Page 70

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Approved Proposed Revised Revised Approved Proposed Revised Revised Approved Proposed
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-23 Adjustment Adjustment Adjustment Adjustment Adjustment Adjustment
Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Community Greenspace
Play Areas - Improvements Implementation Strategy 92 92 17 92 897 (400) 497 587 400 987 878
Third Party Contribution (47) (47) (47) 0 0 0 0 0
Revenue Contribution (Developer Contribution Reserve) (2) (2) (2) 0 0 0 0 0
3G Pitch, Blairgowrie 38 38 2 38 100 (100) 0 0 100 100 0
Settlement/Neighbourhood Parks 25 25 25 0 0 0 0 0
Countryside Sites 23 23 1 23 139 (139) 0 0 139 139 0
Community Greenspace Sites 0 0 0 552 (552) 0 532 122 654 532 150
Community Greenspace Bridges 33 5 38 14 38 31 23 54 0 0 0
Core Path Implementation 48 48 28 48 0 0 0 0 0
Third Party Contribution (60) (60) (60) 0 0 0 0 0
Alyth Environmental Improvements 0 0 0 0 0 0 0 0
Premier Parks 39 39 37 39 14 14 0 0 0
Auchterarder Public Park 263 61 324 192 324 0 0 0 0 0
Third Party Contribution (140) (61) (201) (201) 0 0 0 0 0
The Knock 24 (15) 9 7 9 0 0 0 0 0
Kinnoull Hill 41 (33) 8 2 8 0 0 0 0 0
Cemetery Extensions 25 25 5 25 444 444 150 150 100
Sub-Total 402 0 (43) 359 305 359 2,177 0 (1,168) 1,009 1,269 0 761 2,030 1,510 0 150
Waste Strategy
Recycling Improvement Fund 281 77 358 45 358 2,081 282 2,363 0 0 0
Scottish Government Grant (281) (77) (358) (45) (358) (2,081) (282) (2,363) 0 0 0
Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Support Services
PC Replacement & IT Upgrades
Hardware 10 12 22 23 22 17 (2) 15 17 (2) 15 17 (2)
Licenses 35 163 198 63 198 120 (32) 88 120 (8) 112 120 (25)
Sub-Total 45 0 175 220 86 220 137 0 (34) 103 137 0 (10) 127 137 0 (27)
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units 105 (87) 18 18 0 40 40 0 0 0
Broxden Business Park - Additional Infrastructure 0 17 17 17 0 0 0 0 0
Western Edge, Kinross - Site Servicing 10 7 17 2 17 0 0 0 0 0
Additional Infrastructure Investment - Broxden 46 46 46 0 0 0 0 0
Broxden Drainage Mitigation Works 308 308 59 308 0 0 0 0 0
Third Party Contribution (Scottish Water) (239) (239) (239) 0 0 0 0 0
Ruthvenfield Business Centre 510 (209) 301 73 301 1,145 209 1,354 0 0 0
Third Party Contribution (115) (115) (115) 0 0 0 0 0
North Muirton Drainage 0 47 47 47 0 0 0 0 0
North Muirton Industrial Estate Expansion Land - Servicing 0 0 13 0 0 0 0 0 0
Sub-Total 625 0 (225) 400 147 400 1,145 0 249 1,394 0 0 0 0 0 0 0
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins 265 265 257 265 200 200 200 200 200
Wheeled Bin Replacement Programme - Commercial Bins 39 39 39 20 20 20 20 20
Recycling Containers, Oil Banks & Battery Banks Replacement Prog 111 (57) 54 28 54 65 57 122 65 65 65
Capital Receipts - Disposals (4) (4) (4) (4) 0 0 0 0 0
Litter Bins 25 25 25 25 25 25 50 50 50
Smart Cities - Smart Waste 305 (133) 172 150 172 0 133 133 0 0 0
Third Party Contribution (ERDF) (118) 51 (67) (67) 0 (51) (51) 0 0 0
Vehicle Replacement Programme 1,454 (212) 1,242 787 1,242 1,545 212 1,757 3,300 3,300 3,300
Capital Receipts - Vehicle Disposals (190) 72 (118) (107) (118) (200) (72) (272) (377) (377) (377)
Crematorium - Abatement Works 9 9 4 9 0 0 0 0 0
Street Lighting Renewal - LED & Column Replacement 770 (120) 650 467 650 944 (177) 767 954 (66) 888 945 (120)
LED Traffic Signal Replacement 146 146 97 146 0 0 0 0 0
Almondbank Flood Protection Scheme 4 4 4 4 0 0 0 0 0
Land Purchase & Development (Hotel Development) 1,900 (1,900) 0 0 0 0 0 950 950 0 950
Technology & Innovation Incubator Units 0 0 0 0 0 0 0 0
Sub Total 4,716 0 (2,299) 2,417 1,708 2,417 2,599 0 102 2,701 4,212 0 884 5,096 4,203 0 830
Housing Projects
Gypsy Travellers Site Improvement Works 207 207 8 207 0 0 0 0 0
Additional Gypsy Traveller Site Improvement Works 225 225 9 225 0 0 0 0 0
Gypsy Traveller Site Community Improvement Works 33 33 33 0 0 0 0 0
New Gypsy Traveller Site 0 0 0 0 2,000 2,000 0 0 0
Sub Total 465 0 0 465 17 465 0 2,000 0 2,000 0 0 0 0 0 0 0
Page 70 of 102

Page 71

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Approved Proposed Revised Revised Approved Proposed Revised Revised Approved Proposed
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-23 Adjustment Adjustment Adjustment Adjustment Adjustment Adjustment
Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
TOTAL: COMMUNITIES 75,268 (7,413) (16,302) 51,553 45,101 51,553 105,103 (13,138) 9,904 101,869 91,413 22,602 2,697 116,712 42,419 13,166 2,006
Page 71 of 102

Page 72

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Approved Proposed Revised Revised Approved Proposed Revised Revised Approved Proposed
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-23 Adjustment Adjustment Adjustment Adjustment Adjustment Adjustment
Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Health & Social Care
Occupational Therapy Equipment 250 250 250 250 250 250 250 250 250
Technology Enabled Telecare 1,000 (550) 450 365 450 1,000 550 1,550 1,000 1,000 1,000
Moving & Handling Office Refurbishment 29 (29) 0 0 0 29 29 0 0 0
Software Licences 53 (10) 43 43 53 10 63 53 53 53
Developing Supported Tenancies 0 0 0 229 229 0 0 0
TOTAL: HEALTH & SOCIAL CARE 1,332 0 (589) 743 615 743 1,532 0 589 2,121 1,303 0 0 1,303 1,303 0 0
CORPORATE AND DEMOCRATIC SERVICES
Property Services
DDA Adaptation & Alteration Works Programme 174 174 63 174 400 400 200 200 200
Property Compliance Works Programme 1,626 1,626 1,011 1,626 429 429 650 650 650
Capital Improvement Projects Programme 1,987 (50) 1,937 928 1,937 1,800 50 1,850 1,800 1,800 1,800
Pitlochry High School - Upgrade Programme 635 (170) 465 328 465 90 170 260 0 0 0
Community School of Auchterarder - Structural Improvements 736 736 670 736 0 0 0 0 0
CO2 Monitors for Schools Programme 81 81 81 81 0 0 0 0 0
Energy Efficiency Works - Various Properties 0 0 0 99 99 0 0 0
Revenue Contribution (Salix Reserve) 0 0 0 (99) (99) 0 0 0
Decarbonisation - Prudential Borrowing Programme (PB) 0 0 0 0 2,000 2,000 0 0 0
Energy Conservation & Carbon Reduction Programme (PB) 168 10 178 12 178 150 (10) 140 150 150 150
Information Systems & Technology
ICT Infrastructure & Replacement and Upgrade Programme 2,417 (362) 2,055 668 2,055 2,304 362 2,666 4,928 4,928 3,498
Data & Analytics 415 415 136 415 875 875 675 675 646
Supporting Digital 700 700 67 700 1,306 1,306 714 714 737
Software Licences (Revenues & Benefits) 52 52 52 52 50 50 51 51 51
School Audio-Visual (AV) Equipment Replacement Programme 1,400 (100) 1,300 919 1,300 526 100 626 0 0 0
Mosaic - Swift Social Work System Replacement 404 8 412 303 412 1,282 442 (151) 1,573 0 371 371 0 21
Revenue Contribution 0 0 0 0 0 0 (124) (124) 0 (125)
Customer Service Blueprint 0 0 0 0 0 0 0 0
TOTAL: CORPORATE AND DEMOCRATIC SERVICES 10,795 0 (664) 10,131 5,238 10,131 9,212 2,442 521 12,175 9,168 0 247 9,415 7,732 0 (104)
TOTAL COMPOSITE NET EXPENDITURE 117,566 (17,081) (12,525) 87,960 67,104 87,960 172,052 1,137 4,844 178,033 158,333 22,752 10,499 191,584 87,354 22,984 (2,013)
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
CAPITAL RECEIPTS
General Capital Grant - Scottish Government (14,739) (14,739) (15,458) (14,739) (13,128) (9,032) 13 (22,147) (16,371) 2,524 (13,847) (13,007) 368
Developer Contributions (1,549) (1,549) (1,549) (2,100) (2,100) (2,300) (2,300) (2,367)
General Fund - Capital Receipts/Disposal (46) 38 (8) (4) (8) (934) (38) (972) (250) 0 (250) (250) 0
Commercial Property - Capital Receipts/Disposal (343) 342 (1) 1 (1) (953) 710 (243) (625) (1,054) (1,679) (308) 0
Total: Capital Receipts (16,677) 0 380 (16,297) (15,461) (16,297) (17,115) (9,032) 685 (25,462) (19,546) 2,524 (1,054) (18,076) (15,932) 368 0
Annual Composite Borrowing Requirement 100,889 (17,081) (12,145) 71,663 51,643 71,663 154,937 (7,895) 5,529 152,571 138,787 25,276 9,445 173,508 71,422 23,352 (2,013)
CAPITAL RECEIPTS BROUGHT FORWARD (2,556) 0 (2,556) (2,556) (2,556) (2,274) 117 (2,157) (2,082) 1,076 (1,006) (2,707) 22
CAPITAL RECEIPTS CARRIED FORWARD 2,274 (117) 2,157 2,408 2,157 2,082 (1,076) 1,006 2,707 (22) 2,685 3,015 (22)
TOTAL NET COMPOSITE BORROWING REQUIREMENT100,607 (17,081) (12,262) 71,264 51,495 71,264 154,745 (7,895) 4,570 151,420 139,412 25,276 10,499 175,187 71,730 23,352 (2,013)
Page 72 of 102

Page 73

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
EDUCATION AND CHILDREN'S SERVICES
MIS - Procurement & Integration
MIS - SEEMIS Licensing
Blairgowrie Recreation Centre - Replacement
Schools Modernisation Programme
Investment in the Learning Estate
Free School Meal Expansion Programme
Methven Primary School Refurbishment
Breadalbane Academy, Aberfeldy - 3G Pitch
Third Party Contribution (The Scottish Football Association)
Kirkmichael Primary School Upgrades
Capital Receipt (ring-fenced)
Early Learning & Childcare
- Letham Primary School Upgrade Project
- Rattray Primary School Upgrade Project
North/West Perth - New Primary School
Riverside Primary New School
Technology Upgrades
Perth Academy - Refurbishment
Perth Grammar School - Upgrade Programme Phase 3
Perth High School - Internal Services & Refurbishment
Perth High School - New School Investment
Harris Academy/Invergowrie - Extension
TOTAL: EDUCATION AND CHILDREN'S SERVICES
COMMUNITIES
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..)
Additional Road Safety - Pedestrian Crossings
Schools Road Safety Measures
Scottish Government Grant - CWSS
20mph Signage Programme - Schools
20mph Signage Programme
Cycling Walking & Safer Routes (CWSR)
Scottish Government Grant - CWSR
Third Party Contribution (TACTRAN)
Car Parking Investment
Car Parking Investment - Pitlochry
Strathmore Cycle Network
Sub-Total
Asset Management - Roads & Lighting
Structural Maintenance
Third Party Contribution (Forestry Commission Timber Routes)
Traffic Signal Renewals - Upgrading
Third Party Contributions
Footways
Third Party Contributions
Investment in Local Footpaths
Road Safety Barriers
Sub-Total
Asset Management - Bridges
Bridge Refurbishment Programme
Dalhenzean Culvert
Dunkeld Golf Course
Vehicular Bridge Parapets Programme - Assess & Upgrade
Old Perth Bridge - Strengthening
Perth Queens Bridge - Strengthening
Garry Viaduct
Culteuchar Culvert
Glendevon Bridge
Tullyfergus Bridge
Sub-Total
Revised Revised Approved Proposed Revised Revised Approved Proposed Revised Revised
Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment Adjustment Adjustment
Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 4
2025/26 2026/27 2026/27 2026/27 2026/27 2027/28 2027/28 2027/28 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
0 0 0 0 0 57
0 0 150 (150) 0 0 150 (150) 0 745
4,003 0 0 0 0 34,203
8,550 6,650 2,000 8,650 6,823 6,823 37,015
0 0 0 0 0 3,348
0 0 0 0 0 561
0 0 0 0 0 29
0 0 0 0 0 (29)
0 0 0 0 0 98
0 0 0 0 0 (100)
0 0 0 0 0 38
0 0 0 0 0 19
0 0 0 0 0 1,815
15,000 400 400 0 0 24,000
0 0 0 0 0 14,653
0 0 0 0 0 1,431
2,150 2,150 2,150 0 0 9,980
1,500 504 504 0 0 5,565
0 0 0 0 0 21
10,600 7,800 (4,200) 3,600 0 0 76,836
0 0 0 0 0 5,200
41,803 17,504 150 (2,350) 15,304 6,823 150 (150) 6,823 215,485
362 200 162 362 200 161 361 1,447
175 0 0 0 0 525
0 0 0 0 0 652
0 0 0 0 0 (106)
0 0 0 0 0 200
0 0 0 0 0 76
200 200 200 200 200 2,769
(200) (200) (200) (200) (200) (2,649)
0 0 0 0 0 (120)
0 0 0 0 0 322
0 0 0 0 0 150
84 0 0 0 0 84
621 200 0 162 362 200 0 161 361 3,350
9,593 9,800 9,800 7,500 7,500 61,572
0 0 0 0 0 (1,316)
0 0 0 0 0 199
0 0 0 0 0 (3)
435 435 435 435 435 2,699
0 0 0 0 0 0
100 0 100 100 0 0 200
0 0 0 0 0 33
10,128 10,235 0 100 10,335 7,935 0 0 7,935 63,384
1,445 1,746 1,746 1,406 1,406 10,924
0 0 0 0 264 264 307
0 0 0 0 219 219 248
0 0 0 0 0 29
2,369 0 0 0 0 2,569
70 2,153 2,153 0 0 2,618
300 0 1,900 1,900 0 1,790 1,790 4,400
0 0 0 0 0 437
0 0 0 0 0 235
0 0 0 0 134 134 134
4,184 3,899 1,900 0 5,799 1,406 1,790 617 3,813 21,901
Page 73 of 102

Page 74

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Improvement Schemes
A9/A85 Road Junction Improvements
Cross Tay Link Road (CTLR)
Scottish Government Grant
A977 Upgrades
Brioch Road, Crieff - Road Realignment & Safety Measures
Sub-Total
Rural Flood Protection Schemes
Almondbank Flood Protection Scheme
Revenue Contribution
Perth Flood Protection Scheme (Pump Replacement)
Perth Flood Protection Scheme (South Inch Culvert Reinstatement)
Comrie Flood Protection Scheme
Milnathort Flood Protection Scheme
South Kinross Flood Protection Scheme
Scone Flood Protection Scheme
Coastal Change Adaptation
Sub-Total
Perth & Kinross Place-making
Mill Street Environmental Improvements
Perth, Place, People
Perth City Centre Golden Route (Rail Station)
City Greening
Perth & Kinross Lighting Action Plan
Sub-Total
Other Planning Projects
Creative Exchange (former St. John's Primary School)
Town Centre - Regeneration & Economic Improvements
Scottish Government Grant
TCF Revenue Contribution
Local Full Fibre Network
Third Party Contribution - TCF
Third Party Contribution - Tay Cities Deal
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers
Third Party Contribution - ERDF
Third Party Contribution - Tay Cities Deal
Perth Eco-Innovation Park at Perth West
Third Party Contributions - Tay Cities Deal
Other Third Party Contributions
Capital Receipts - Ring Fenced Land Disposals
Coupar Angus - Strathmore Community Hub
Nature Restoration
Sub-Total
City Centre Developments - Cultural Attractions
Perth Museum
Perth Art Gallery
Collections Centre
PH2O
Sub-Total
Community Planning
Letham Community Wellbeing Hub
Scottish Government Grant (Regeneration Fund)
Third Party Contribution (Letham4All)
Revenue Contribution (Place Based Development Grant)
Sub-Total
Revised Revised Approved Proposed Revised Revised Approved Proposed Revised Revised
Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment Adjustment Adjustment
Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 4
2025/26 2026/27 2026/27 2026/27 2026/27 2027/28 2027/28 2027/28 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
0 0 0 0 0 359
0 0 0 0 0 133,703
0 0 0 0 0 (35,000)
0 0 0 0 0 540
0 0 0 0 0 31
0 0 0 0 0 0 0 0 0 99,633
0 0 0 0 0 93
0 0 0 0 0 (54)
0 0 0 0 0 0
0 0 0 0 0 386
0 0 0 0 0 26,083
0 0 0 0 0 1,754
1,787 0 0 0 0 3,310
601 0 0 0 0 772
0 0 0 0 0 100
2,388 0 0 0 0 0 0 0 0 32,444
0 0 0 0 0 127
0 0 0 0 0 3,599
0 0 0 0 0 30
0 0 0 0 0 31
0 0 0 0 0 2,752
0 0 0 0 0 0 0 0 0 6,539
0 0 0 0 0 53
0 0 0 0 0 26
0 0 0 0 0 (66)
0 0 0 0 0 (23)
0 0 0 0 0 158
0 0 0 0 0 40
0 0 0 0 0 (198)
0 0 0 0 0 994
0 0 0 0 0 (376)
0 0 0 0 0 (617)
9,017 0 0 0 0 32,817
(550) (550) 45 (505) (505) (1,451) (1,956) (5,000)
0 (1,000) (1,000) (2,000) (1,000) (2,000) (3,000) (5,000)
0 (550) (550) (550) (175) (725) (1,275)
0 0 0 0 0 63
0 0 0 0 0 206
8,467 (2,100) (955) 0 (3,055) (2,055) (3,626) 0 (5,681) 21,802
0 0 0 0 0 13,010
0 0 0 0 0 3,316
0 0 0 0 0 0
25,000 20,000 20,000 15,000 15,000 90,000
25,000 20,000 0 0 20,000 15,000 0 0 15,000 106,326
0 0 0 0 0 3,869
0 0 0 0 0 (524)
0 0 0 0 0 (519)
0 0 0 0 0 (735)
0 0 0 0 0 0 0 0 0 2,091
Page 74 of 102

Page 75

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Community Greenspace
Play Areas - Improvements Implementation Strategy
Third Party Contribution
Revenue Contribution (Developer Contribution Reserve)
3G Pitch, Blairgowrie
Settlement/Neighbourhood Parks
Countryside Sites
Community Greenspace Sites
Community Greenspace Bridges
Core Path Implementation
Third Party Contribution
Alyth Environmental Improvements
Premier Parks
Auchterarder Public Park
Third Party Contribution
The Knock
Kinnoull Hill
Cemetery Extensions
Sub-Total
Waste Strategy
Recycling Improvement Fund
Scottish Government Grant
Sub-Total
Support Services
PC Replacement & IT Upgrades
Hardware
Licenses
Sub-Total
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units
Broxden Business Park - Additional Infrastructure
Western Edge, Kinross - Site Servicing
Additional Infrastructure Investment - Broxden
Broxden Drainage Mitigation Works
Third Party Contribution (Scottish Water)
Ruthvenfield Business Centre
Third Party Contribution
North Muirton Drainage
North Muirton Industrial Estate Expansion Land - Servicing
Sub-Total
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins
Wheeled Bin Replacement Programme - Commercial Bins
Recycling Containers, Oil Banks & Battery Banks Replacement Prog
Capital Receipts - Disposals
Litter Bins
Smart Cities - Smart Waste
Third Party Contribution (ERDF)
Vehicle Replacement Programme
Capital Receipts - Vehicle Disposals
Crematorium - Abatement Works
Street Lighting Renewal - LED & Column Replacement
LED Traffic Signal Replacement
Almondbank Flood Protection Scheme
Land Purchase & Development (Hotel Development)
Technology & Innovation Incubator Units
Sub Total
Housing Projects
Gypsy Travellers Site Improvement Works
Additional Gypsy Traveller Site Improvement Works
Gypsy Traveller Site Community Improvement Works
New Gypsy Traveller Site
Sub Total
Revised Revised Approved Proposed Revised Revised Approved Proposed Revised Revised
Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment Adjustment Adjustment
Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 4
2025/26 2026/27 2026/27 2026/27 2026/27 2027/28 2027/28 2027/28 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
878 150 150 150 150 2,754
0 0 0 0 0 (47)
0 0 0 0 0 (2)
0 0 0 0 0 138
0 0 0 0 0 25
0 0 0 0 0 162
682 532 150 682 528 150 678 2,696
0 0 0 0 0 92
0 0 0 0 0 48
0 0 0 0 0 (60)
0 0 0 0 0 0
0 0 0 0 0 53
0 0 0 0 0 324
0 0 0 0 0 (201)
0 0 0 0 0 9
0 0 0 0 0 8
100 100 100 100 100 919
1,660 782 0 150 932 778 0 150 928 6,918
0 0 0 0 0 2,721
0 0 0 0 0 (2,721)
0 0 0 0 0 0 0 0 0 0
15 17 (3) 14 17 (3) 14 95
95 120 (49) 71 120 (49) 71 635
110 137 0 (52) 85 137 0 (52) 85 730
0 0 0 0 0 58
0 0 0 0 0 17
0 0 0 0 0 17
0 0 0 0 0 46
0 0 0 0 0 308
0 0 0 0 0 (239)
0 0 0 0 0 1,655
0 0 0 0 0 (115)
0 0 0 0 0 47
0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1,794
200 200 200 200 200 1,265
20 20 20 20 20 139
65 65 65 65 65 436
0 0 0 0 0 (4)
50 50 50 50 50 250
0 0 0 0 0 305
0 0 0 0 0 (118)
3,300 3,300 3,300 3,000 3,000 15,899
(377) (377) (377) (347) (347) (1,868)
0 0 0 0 0 9
825 959 (418) 541 932 (340) 592 4,263
0 0 0 0 0 146
0 0 0 0 0 4
950 0 0 0 0 1,900
0 0 0 0 0 0
5,033 4,217 0 (418) 3,799 3,920 0 (340) 3,580 22,626
0 0 0 0 0 207
0 0 0 0 0 225
0 0 0 0 0 33
0 0 0 0 0 2,000
0 0 0 0 0 0 0 0 0 2,465
Page 75 of 102

Page 76

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
TOTAL: COMMUNITIES
Revised Revised Approved Proposed Revised Revised Approved Proposed Revised Revised
Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment Adjustment Adjustment
Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 4
2025/26 2026/27 2026/27 2026/27 2026/27 2027/28 2027/28 2027/28 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
57,591 37,370 945 (58) 38,257 27,321 (1,836) 536 26,021 392,003
Page 76 of 102

Page 77

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2027/28
APPENDIX II
Health & Social Care
Occupational Therapy Equipment
Technology Enabled Telecare
Moving & Handling Office Refurbishment
Software Licences
Developing Supported Tenancies
TOTAL: HEALTH & SOCIAL CARE
CORPORATE AND DEMOCRATIC SERVICES
Property Services
DDA Adaptation & Alteration Works Programme
Property Compliance Works Programme
Capital Improvement Projects Programme
Pitlochry High School - Upgrade Programme
Community School of Auchterarder - Structural Improvements
CO2 Monitors for Schools Programme
Energy Efficiency Works - Various Properties
Revenue Contribution (Salix Reserve)
Decarbonisation - Prudential Borrowing Programme (PB)
Energy Conservation & Carbon Reduction Programme (PB)
Information Systems & Technology
ICT Infrastructure & Replacement and Upgrade Programme
Data & Analytics
Supporting Digital
Software Licences (Revenues & Benefits)
School Audio-Visual (AV) Equipment Replacement Programme
Mosaic - Swift Social Work System Replacement
Revenue Contribution
Customer Service Blueprint
TOTAL: CORPORATE AND DEMOCRATIC SERVICES
TOTAL COMPOSITE NET EXPENDITURE
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED
CAPITAL RECEIPTS
General Capital Grant - Scottish Government
Developer Contributions
General Fund - Capital Receipts/Disposal
Commercial Property - Capital Receipts/Disposal
Total: Capital Receipts
Annual Composite Borrowing Requirement
CAPITAL RECEIPTS BROUGHT FORWARD
CAPITAL RECEIPTS CARRIED FORWARD
TOTAL NET COMPOSITE BORROWING REQUIREMENT
Revised Revised Approved Proposed Revised Revised Approved Proposed Revised Revised
Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
Adjustment Adjustment Adjustment Adjustment
Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 3 01-Mar-23 Report 4 Report 4 Report 4
2025/26 2026/27 2026/27 2026/27 2026/27 2027/28 2027/28 2027/28 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
250 250 250 250 250 1,500
1,000 1,000 1,000 1,000 1,000 6,000
0 0 0 0 0 29
53 53 53 69 69 334
0 0 0 0 0 229
1,303 1,303 0 0 1,303 1,319 0 0 1,319 8,092
200 200 200 200 200 1,374
650 650 650 650 650 4,655
1,800 1,800 1,800 894 894 10,081
0 0 0 0 0 725
0 0 0 0 0 736
0 0 0 0 0 81
0 0 0 0 0 99
0 0 0 0 0 (99)
0 0 0 0 0 2,000
150 150 150 150 150 918
3,498 2,633 2,633 2,793 2,793 18,573
646 668 668 691 691 3,970
737 760 760 785 785 5,002
51 51 51 51 51 306
0 0 0 0 0 1,926
21 0 0 0 0 2,377
(125) 0 0 0 0 (249)
0 0 0 0 0 0
7,628 6,912 0 0 6,912 6,214 0 0 6,214 52,475
108,325 63,089 1,095 (2,408) 61,776 41,677 (1,686) 386 40,377 668,055
(12,639) (12,265) 115 (12,150) (12,265) 115 (12,150) (87,672)
(2,367) (2,600) (2,600) (2,600) (2,600) (13,516)
(250) (250) 0 (250) (250) 0 (250) (1,980)
(308) 0 0 0 0 0 0 (2,231)
(15,564) (15,115) 115 0 (15,000) (15,115) 115 0 (15,000) (105,399)
92,761 47,974 1,210 (2,408) 46,776 26,562 (1,571) 386 25,377 562,656
(2,685) (3,015) 22 (2,993) (3,015) 22 (2,993) (2,556)
2,993 3,015 (22) 2,993 3,015 (22) 2,993 2,993
93,069 47,974 1,210 (2,408) 46,776 26,562 (1,571) 386 25,377 563,093
Page 77 of 102

Page 78

Page 78 of 102

Page 79

APPENDIX III
Approved Approved Proposed Revised Actual Projected Approved Approved Proposed Revised Approved Approved Proposed Revised Approved Approved Proposed Revised Approved Approved Proposed Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
01-Feb-23 Adjustment Adjustment 28-Feb-23 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment
25-Jan-23 Report 4 Report 4 Report 4 25-Jan-23 Report 4 Report 4 25-Jan-23 Report 4 Report 4 25-Jan-23 Report 4 Report 4 25-Jan-23 Report 4 Report 4 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2026/27 2026/27 2026/27 TOTAL
£'000 (£'000) £'000 £'000 £'000 £'000 £'000 (£'000) £'000 £'000 £'000 (£'000) £'000 £'000 £'000 (£'000) £'000 £'000 £'000 (£'000) £'000 £'000 £'000
Council House New Build Programme
Glebe, Scone - 65 Units 21 0 21 21 0 0 0 0 0 0 0 0 0 0 0 0 21   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
21 0 0 21 0 21 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21
Milne Street, Perth - 8 Units 3 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 3   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0   
Third Party Contribution (Commuted Sums) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 0 0 3 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3
Huntingtower, Perth - 70 Units 2 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 2   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 0 0 2 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2
Fairfield, Perth 2,653 0 2,653 2,088 2,653 0 0 0 0 0 0 0 0 0 0 0 0 2,653   
Council Tax (Second Income) (360) 0 (360) (360) (360) 0 0 0 0 0 0 0 0 0 0 0 0 (360)
Scottish Government Subsidy (652) 0 (652) (651) (652) 0 0 0 0 0 0 0 0 0 0 0 0 (652)
1,641 0 0 1,641 1,077 1,641 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,641
Lynedoch Road, Methven 2,362 0 218 2,580 2,193 2,580 1,039 0 (218) 821 0 0 0 0 0 0 0 0 0 3,401   
Council Tax (Second Income) (480) 0 (480) (480) (480) 0 0 0 0 0 0 0 0 0 0 0 0 (480)
Scottish Government Subsidy (1,074) 0 (1,074) (1,074) (1,074) 0 0 0 0 0 0 0 0 0 0 0 0 (1,074)
808 0 218 1,026 639 1,026 1,039 0 (218) 821 0 0 0 0 0 0 0 0 0 0 0 0 1,847
Newburgh Road, Abernethy 414 0 414 424 414 0 0 0 0 0 0 0 0 0 0 0 0 414   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 (21) 0 0 0 0 0 0 0 0 0 0 0 0 0 0   
Capital Receipts (708) 0 (708) (766) (708) 0 0 0 0 0 0 0 0 0 0 0 0 (708)
(294) 0 0 (294) (363) (294) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (294)
Future Developments 3,751 0 3,751 3,751 4,894 0 4,894 5,128 0 5,128 6,014 0 6,014 3,014 3,000 6,014 25,801   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3,751 0 0 3,751 0 3,751 4,894 0 0 4,894 5,128 0 0 5,128 6,014 0 0 6,014 3,014 3,000 0 6,014 25,801
Total Council House New Build 5,932 0 218 6,150 1,353 6,150 5,933 0 (218) 5,715 5,128 0 0 5,128 6,014 0 0 6,014 3,014 3,000 0 6,014 29,021
Increase in Council House Stock
Council House Buy-Backs 3,298 0 822 4,120 4,121 4,120 4,050 0 (612) 3,438 3,000 0 3,000 3,000 0 3,000 3,000 0 3,000 16,558
Scottish Government Subsidy (1,050) 0 (210) (1,260) (1,050) (1,260) (1,050) 0 (1,050) 0 0 0 0 0 0 0 0 0 (2,310)
2,248 0 612 2,860 3,071 2,860 3,000 0 (612) 2,388 3,000 0 0 3,000 3,000 0 0 3,000 3,000 0 0 3,000 14,248
Lock-ups and Garage Sites 0 0 0 0 0 0 0 50 0 50 0 0 0 0 0 0 50
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2022/23 to 2026/27
PERTH AND KINROSS COUNCIL
7
Page 79 of 102

Page 80

APPENDIX III
Approved Approved Proposed Revised Actual Projected Approved Approved Proposed Revised Approved Approved Proposed Revised Approved Approved Proposed Revised Approved Approved Proposed Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
01-Feb-23 Adjustment Adjustment 28-Feb-23 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment 01-Feb-23 Adjustment Adjustment
25-Jan-23 Report 4 Report 4 Report 4 25-Jan-23 Report 4 Report 4 25-Jan-23 Report 4 Report 4 25-Jan-23 Report 4 Report 4 25-Jan-23 Report 4 Report 4 Report 4
2022/23 2022/23 2022/23 2022/23 2022/23 2022/23 2023/24 2023/24 2023/24 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2026/27 2026/27 2026/27 TOTAL
£'000 (£'000) £'000 £'000 £'000 £'000 £'000 (£'000) £'000 £'000 £'000 (£'000) £'000 £'000 £'000 (£'000) £'000 £'000 £'000 (£'000) £'000 £'000 £'000
Standard Delivery Plan
Central Heating and Rewiring Works 864 0 (142) 722 538 722 0 0 142 142 0 0 0 0 0 0 0 0 0 864 
- less Third Party Contribution 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Rewiring, Infrastructure & Property Refurbishment 941 0 941 395 941 1,000 0 1,000 1,686 0 1,686 0 0 0 0 0 0 3,627
Triple Glazing 111 0 220 331 90 331 0 0 2,500 2,500 0 0 0 0 0 0 0 0 0 2,831
Controlled Door Entry 35 0 35 38 35 0 0 0 30 0 30 0 0 0 0 0 0 65 
- less Third Party Contribution (2) 0 (2) (1) (2) 0 0 0 0 0 0 0 0 0 0 0 0 (2)
Kitchen Modernisation Programme 290 0 50 340 211 340 1,832 0 (50) 1,782 1,504 0 1,504 625 0 625 0 0 0 4,251
Bathroom Modernisation Programme 1,110 0 400 1,510 1,252 1,510 0 0 0 0 0 0 0 0 0 0 0 0 1,510
External Fabric 2,200 0 400 2,600 2,340 2,600 598 0 (400) 198 528 0 528 625 0 625 0 0 0 3,951 
- less Third Party Contribution 0 0 0 (16) 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Energy Efficiency 331 0 331 78 331 0 0 0 875 0 875 625 0 625 0 0 0 1,831
Multi Storey Flats 2,290 (2,000) 290 30 290 0 2,000 2,000 0 0 0 0 0 0 0 0 0 2,290
Environmental Improvements 602 0 602 378 602 333 0 333 0 0 0 0 0 0 0 0 0 935
Fire Precaution Measures 524 0 524 481 524 0 0 0 0 0 0 0 0 0 0 0 0 524
Sound Insulation 140 0 140 13 140 162 0 162 100 0 100 42 0 42 0 0 0 444
Structural 20 0 20 20 458 0 458 250 0 250 522 0 522 0 0 0 1,250
SHQS Future Developments 0 0 0 0 0 0 0 0 0 0 7,216 0 (3,150) 4,066 10,030 0 10,030 14,096
Total Standard Delivery Plan 9,456 (2,000) 928 8,384 5,827 8,384 4,383 2,000 2,192 8,575 4,973 0 0 4,973 9,655 0 (3,150) 6,505 10,030 0 0 10,030 38,467
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 4 0 4 4 0 0 0 100 0 100 0 0 0 0 0 0 104
Balmoral Road, Rattray, Refurbishment (3 Units) 273 0 273 273 0 0 0 0 0 0 0 0 0 0 0 0 273
Anchor House, Rannoch Road, Perth - Conversion (5 Units) 109 0 (100) 9 2 9 0 0 100 100 0 0 0 0 0 0 0 0 0 109
149-151 Dunkeld Road, Perth 25 0 25 2 25 0 0 0 0 0 0 0 0 0 0 0 0 25 
- Government Grant 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
111 Rannoch Road, Perth (Former Driving Test Centre) 227 0 227 208 227 0 0 0 0 0 0 0 0 0 0 0 0 227
St.Catherine's Square Redevelopment 0 0 0 0 2,991 0 2,991 402 0 402 0 0 0 0 0 0 3,393
Shops & Offices 192 0 (186) 6 3 6 50 0 186 236 50 0 50 0 0 0 0 0 0 292
Greyfriars and Satellite Sites 34 0 34 34 0 0 0 50 0 50 0 0 0 0 0 0 84
Sheltered Housing 13 0 35 48 17 48 0 0 0 5 0 (5) 0 0 0 0 0 0 0 48
Double Dykes Chalet Replacement 0 0 73 73 12 73 0 0 0 0 0 0 0 0 0 0 0 0 73 
- Scottish Government Grant 0 0 (73) (73) 0 (73) 0 0 0 0 0 0 0 0 0 0 0 0 (73)
General Capital Works 31 0 31 32 31 0 0 0 0 0 0 0 0 0 0 0 0 31
Upgrade and Replacements to Lifts Programme 143 0 (139) 4 4 4 0 0 139 139 0 0 0 0 0 0 0 0 0 143
ICT Expenditure 178 0 (178) 0 0 50 0 178 228 50 0 50 0 0 0 0 0 0 278
Mortgage to Rent 125 0 125 125 50 0 50 50 0 50 0 0 0 0 0 0 225
Total Other Investment in Council House Stock 1,354 0 (568) 786 280 786 3,141 0 603 3,744 707 0 (5) 702 0 0 0 0 0 0 0 0 5,232
Total Net Expenditure 18,990 (2,000) 1,190 18,180 10,531 18,180 16,457 2,000 1,965 20,422 13,858 0 (5) 13,853 18,669 0 (3,150) 15,519 16,044 3,000 0 19,044 87,018
Income
CAPITAL RECEIPTS (9) (185) (194) (9) (194) 0 0 0 0 0 0 0 0 0 0 0 0 (194)
CFCR (2,458) 0 (2,458) (2,458) (2,645) 590 (2,055) (3,329) 1,411 (1,918) (3,960) 1,712 (2,248) (4,279) 1,759 (2,520) (11,199)
TOTAL BORROWING REQUIREMENT 16,523 (2,000) 1,005 15,528 10,522 15,528 13,812 2,590 1,965 18,367 10,529 1,411 (5) 11,935 14,709 1,712 (3,150) 13,271 11,765 4,759 0 16,524 75,625
Page 80 of 102

Page 81

Appendix IV
Project Title Total Gross
Budget
(£'000)
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On Site Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement
36,000 0 36,000 36,000 Easter 2025 - new
centre currently
scheduled to open late
2024
Yes Yes On track Yes - on-site
and letter of
intent signed
Additional £9.3m of funding approved by the Council on
1 March 2023. Letter of intent signed with Hubco/BAM to
secure some pricing elements. Anticpated financial close
and start on site for mid-May 2023, with estimated
completion for Easter 2025.
North/West Perth New
Primary School*
24,000 0 24,000 24,000 Summer 2026 No No On track No New Project Request submitted to HubCo in February
2023. Consultant/ Contractor selection in progress.
Riverside Primary New
School
19,899 0 19,899 19,899 Early summer 2023 Yes Yes New completion
date agreed
Yes - revised
completion date
Completion date changed due to commissioning
requirements
Perth High School - New
School Investment
80,200 0 80,200 80,200 Summer 2026 - school
building curently
scheduled to open
summer 2025
Yes Yes On track Yes - on-site
and FC
concluded
FC concluded and construction works commenced.
Harris
Academy/Invergowrie
Extension
5,200 0 5,200 5,200 Late 2023 Yes Yes On track No Construction contract signed - project to be delivered by
Dundee City Council
Cross Tay Link Road
(CTLR) 150,500 40,000 110,500 110,500 Spring 2025 Yes Yes On track No
Some movement in expenditure in 2022/23 relating to
programming of works, as well as risk contingency and
compensation events not materialising in year.
Expenditure reprofiled.
Comrie Flood Protection
Scheme
28,435 0 28,435 28,435 End of 2024 No No Advance works
substantially
complete
No Detailed design on-going; anticipated completion is at
end of March 2023. Preliminary advance works are
ongoing and substantially complete with main
construction works anticipated to start in summer 2023,
with a duration of 18 months.
Perth Eco Innovation Park* 32,817 11,275 21,542 21,542
Not currently
programmed No No
Preliminary
design works
completed
Yes -
confirmation of
additional
resources
approved by
Council
Following the application for Levelling Up Fund Grant
funding of £10 million being unsuccessful, the Council
approved a net increased of £10m on 1 March 2023.
Further contributions and receipts are anticipated in
years beyond the current programme to 2027/28.
Perth Museum 27,232 10,300 16,932 16,932 Spring 2024 Yes Yes On track No
Collections Centre 0 0 0 0 n/a No No
Project
removed from
the programme
by the Council
on 1 March
2023 Yes
PH2O 90,000 0 90,000 90,000
Not currently
programmed No No
Outline
Business Case
reported to
Council  23
February 2023,
and project on
hold pending
review. Yes
Council approved to put the project on hold due to
affordability and pending the outcome of a wider review
in to leisure and cultural assets and how best to target
the required investment in arts and leisure for the benefit
of the wider community.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 5-year programme.
7
Page 81 of 102

Page 82

Page 82 of 102

Page 83

PERTH AND KINROSS COUNCIL 
Finance & Resources Committee
26 April 2023 
TREASURY ACTIVITY AND COMPLIANCE REPORT
2022/23 QUARTER 4 
Report by Head of Finance
(Report No. 23/122) 
1. PURPOSE 
1.1 The purpose of this report is to update the Committee on Treasury Activity for
the quarter ending 31 March 2023 and to report on compliance with the
Council’s Treasury Management Policy Statement (TMPS); Investment
Strategy and Prudential Indicators. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) notes the content of this report.
(ii) approves the continuation of the Council’s 2022/23 Permitted
Investments until 10 May 2023. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Economic Background
• Section 5: Treasury Activity
• Section 6: Compliance
• Section 7: Investment Strategy Compliance and Performance
• Section 8: Prudential Indicators
• Section 9: Conclusion 
4. ECONOMIC BACKGROUND 
4.1 The Bank of England’s Monetary Policy Committee (MPC) increased the UK
Bank Base Rate from 3.50% to 4.0% at its meeting on 2 February 2023, with
a further increase to 4.25% on 23rd March 2023.These increases were in
response to high CPI inflation. While UK Inflation fell slightly from 10.5% in
December 2022 to 10.1% in January 2023 it unexpectedly increased to 10.4%
in February 2023. The biggest upward pressure came from the cost of food
and non-alcoholic beverages mainly due to shortages of salad produce and
other vegetables in Southern Europe & Africa, as well as the impact of higher
electricity prices. Retail Price Index (RPI) inflation increased from 13.4% in
January 2023 to 13.8% in February 2023. The latest CPI inflation figure
shows a reduction to 10.1% in March 2023 (RPI 13.5%), with continuing high
food prices keeping inflation higher than forecast. 
8
Page 83 of 102

Page 84

4.2 UK Gross Domestic Product (GDP) showed no growth in the 3 months to
December 2022 with exports declining and imports increasing, however this
was better than forecast. 
4.3 Internationally, Europe experienced no GDP growth in the last quarter to 31
December 2022, but there was a slight reduction in inflation. However, as
inflation was still at a high level in these regions, central banks also increased
their bank rates over the quarter. In the US, GDP and Inflation both fell. The
US interest rate also increased in response to continued high inflation. 
4.4 The Public Works Loan Board’s (PWLB) certainty fixed interest rates for the
quarter, which are based on yields on UK gilts, are shown in the graph in
Appendix I. PWLB borrowing rates showed significant volatility over the
quarter and had decreased at the start of the quarter before increasing
significantly in the second half of the quarter. The volatility was caused by the
impact of base rate increases, inflationary pressures, and economic growth
prospects relative to other major economies. Uncertainty surrounding the
global banking sector also added to the volatility towards the end of the
quarter. Over the 3-month period, longer-term rates were slightly lower by the
end of the quarter, whilst the short term (1 year) rate ended higher. 
5.  TREASURY ACTIVITY 
5.1 A summary of the Council’s treasury position and transactions is shown in
Appendix II. The main activities are detailed below. 
5.2 During the quarter there was no new long-term PWLB borrowing undertaken,
however there was one maturing 11.5 year PWLB fixed-rate loan for £3
million at 4.22% repaid in the quarter. Therefore, over the quarter the
Council’s total long-term debt reduced from £606.3 million to £603.3 million at
an average rate of 2.56%. There was 1 short-term market loan borrowed in
the quarter for £3 million for 17 days at 4.0%, which was repaid before the
end of the quarter. 
5.3 Common Good and Charitable Fund balances held on fixed deposit within the
Loans Fund increased slightly from £2.132 million to £2.294 million, with the
average interest rate paid increasing from 1.14%to 3.93%. Funds held from
associated bodies and organisations reduced from £4.129 million to £3.117
million over the quarter, in line with their own cash flow requirements, whilst
the average rate paid on these funds increased from 2.86% to 3.63% in line
with increases in the Bank Base Rate. 
5.4 Short term cashflow surpluses are invested in a mixture of fixed term
deposits, instant access accounts, notice accounts and money market funds.
All investments were made in accordance with the approved Investment
Strategy and Permitted Investments. 
Fixed Term Deposits 
5.5 Cashflow surpluses which arise during the year, and which are not
immediately required, are generally invested in fixed term deposits for periods
Page 84 of 102

Page 85

of up to 12 months, or up to 3 years where forecast cashflow requirements
allow. 
5.6 There were 14 fixed rate deposits made in the quarter (totalling £92 million) at
an average amount of £3.5 million and at an average interest rate of 4.19%
and average term of 176 days. Fixed deposit activity in the current quarter
therefore increased from the previous quarter to 31 December (£25 million)
mainly due to maturing deposits and retaining cashflows in the run up to the
end of the financial year. The deposits were spread between different banking
sectors and other local authorities. As interest rates increased over the
quarter, the average rate also improved. Deposits undertaken in the quarter
will generate £2,314,645 in interest at their maturity. 
Investments for Daily Cashflow Requirements  
5.7 Cashflow surpluses which are required for more immediate needs are
invested in the Council’s instant access, notice deposit accounts and money
market funds. These investment transactions in the quarter can be
summarised as follows: 
• The daily average amount of such funds over the quarter reduced from
£7.2 million in the last quarter to £4.4 million in the current quarter. 
• The average interest rate achieved on these accounts over the quarter
increased from 2.83% to 3.64% reflecting the increase in the base rate.
• The reduction in activity on these accounts reflects the increase in fixed
deposit transactions and cashflow balances in the last quarter of the
financial year. 
• Money Market Funds, which operate on instant access terms, were
used extensively over the quarter to invest day-to-day cashflow
balances. However, the average amount invested reduced from £11.8
million in the previous quarter to £6.5 million in the current quarter,
whilst the average interest rate increased from 2.89% to 3.72%.
• Interest generated on these investments over the quarter amounted to
£90,473. 
5.8 The total amount of investments outstanding at 31 March 2023 was £173.650
million compared to £207.67 million at the end of the previous quarter. The
overall average rate of interest on the investments outstanding increased from
2.67% at the end of the previous quarter to 3.76% at the end of the current
quarter. This increase reflects the increases in base rates over the quarter. 
5.9 Total investment income generated on the investments undertaken during the
quarter is £2,405,117 (£456,228 in the quarter ended 31 December 2022).
This measure reflects the total return on the investment activity undertaken in
each quarter and is significantly higher in comparison to the last quarter due
to the increase in fixed deposit activity for longer durations, and the significant
increase in interest rates available. 
5.10 All of the above investment activities are consistent with the Council’s current
investment strategy and cashflow requirements. 
Page 85 of 102

Page 86

6. COMPLIANCE  
6.1 For the quarter ending 31 March 2023, there were no breaches in compliance
with the Council’s approved Treasury Management Policy Statement,
Treasury Management Practices (TMP’s) or lending limits as detailed in TMP
4 (Approved Instruments, Methods & Techniques).  
6.2 Appendix III shows the list of approved counterparties, based on the Council’s
current lending policy, as at March 2023.  
6.3 For the quarter ending 31 March 2023 the average closing cleared bank
balance was £28,405 in credit. This reflects the application of the Council’s
“sweep facility” operated by the bank, with any credit balance in excess of
£35,000 being “swept up” overnight to the Council’s instant access account. 
7. INVESTMENT STRATEGY COMPLIANCE AND PERFORMANCE  
7.1  The Treasury Investment Strategy for 2022/23 was approved by the Council
at its meeting on 9 March 2022 (report 22/47 refers).  
7.2 In the current quarter, the level of Council investments peaked at £232.977
million on 18 January 2023 and reduced to £173.650 million by the end of the
quarter. The average daily investment balance over the quarter was £205.159
million, which decreased from an average of £237.987 million in the previous
quarter and from £262.917 million in the same quarter of last year. This
highlights the significant reduction in investment balances in the quarter. 
7.3 As a result of long-term borrowing last year, the investment balances in the
current year have been higher. However, this is steadily reducing (subject to
daily fluctuations) as the Capital programme is delivered, and in line with
forecast cashflows particular towards the end of the financial year. In line with
the approved Capital Programme, investment balances are forecast to fall
significantly over the next 12 months.  
7.4 The Investment Strategy was applied in full over the quarter, with liquidity
being maintained using instant access accounts and money market funds as
detailed in paragraph 5.7 above. There were no other risks identified in the
quarter.   
7.5 As the Council’s Treasury & Investment Strategy for 2023/24 to 2027/28 will
not be considered until the Council meeting on 10 May 2023, it is proposed
that the Permitted Investments for 2022/23 continue in force until that time. It
is not proposed to make any changes to the Permitted Investments or limits at
this time. 
7.6 The Investment Strategy also incorporates investments held by the Common
Good Funds. All such investments during the quarter were with the Council’s
Loans Fund. The only Council funds held by external fund managers relate to
Council administered Charitable Trusts and are, therefore, not covered by this
Investment Strategy. 
Page 86 of 102

Page 87

7.7  The budgeted income in 2022/23 for Commercial Property investments is
£1,812,000 whilst the latest projection for the year is £1,868,000. There were
no new property investments entered into during the quarter.  
8. PRUDENTIAL INDICATORS 
8.1 Prudential Indicators for 2022/23 to 2027/28 were approved by the Council at
the meeting on 9 March 2022 (report 22/47 refers) as part of the Annual
Treasury & Investment Strategy report.  
8.2 The latest estimates of the Prudential Indicators, in line with the Council’s
current approved Capital Budget and Capital Financing (borrowing)
requirements, are shown in Appendix IV. These show that the Council
adhered to all Prudential limits in the quarter. However, the annual Loan
Charges relative to the Net Revenue stream and the Capital Financing
(Borrowing) Requirement show an increasing trend which reflects the current
Capital Programme and increasing interest rates forecast over the period. The
estimates of Capital Expenditure and the borrowing requirements also reflect
the increases approved in the Composite Capital programme over the last
year. 
9. CONCLUSION 
9.1 The Bank of England’s MPC increased the Bank Base Rate from 3.50% to
4.25% over the quarter due to continued inflationary pressures. Inflation
increased unexpectedly in February 2023 primarily due to food and energy
costs. 
9.2 PWLB borrowing rates fluctuated over the quarter due to the continued
inflationary expectations and economic growth prospects. Rates for short-term
PWLB borrowing increased over the quarter whilst the rates for longer term
borrowing fell slightly.  All rates, however, remain at higher levels compared to
early in the year. 
9.3 Investment activity in the quarter consisted mainly of the use of fixed deposits
as previous deposits matured, and the use of money market funds to meet day-
to-day cashflows. Investment rates and activity increased over the quarter,
however, the total level of investments outstanding reduced. 
9.4 The Council adhered to its Investment Strategy and policies throughout the
quarter, with no breaches in compliance. It is proposed that the Permitted
Investments for 2022/23 continue in force until the Council consider the
Annual Treasury & Investment Strategy on 10 May 2023. 
9.5 The Council’s Prudential Indicators were also adhered to throughout the
quarter.   
Author(s)
Name  Designation Contact Details
Page 87 of 102

Page 88

John Jennings  Senior Accountant  CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date 
Stewart MacKenzie 
Karen Donaldson 
Head of Finance 
Chief Operating Officer 
4 April 2023 
4 April 2023 
Page 88 of 102

Page 89

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.
Page 89 of 102

Page 90

Workforce 
2.2 There are no direct workforce implications arising from this report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
4.1 The Chief Executive and the Council’s Treasury advisors, Link Asset
Services, have been consulted in the preparation of this report.   
Page 90 of 102

Page 91

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix I – PWLB Fixed Maturity Interest Rates from 1 January to
31 March 2023.
• Appendix II – Summary of the Treasury Position and Transactions from
1 January to 31 March 2023.
• Appendix III – Approved Investment Counterparty List.
• Appendix IV – Monitoring of Prudential Indicators – Quarter ending
31 March 2023.
Page 91 of 102

Page 92

Page 92 of 102

Page 93

PWLB Fixed Maturity Interest Rates
From 1st January to 31st March 2023
(Certainty Rate)
APPENDIX  I
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
01-Jan-23
08-Jan-23
15-Jan-23
22-Jan-23
29-Jan-23
05-Feb-23
12-Feb-23
19-Feb-23
26-Feb-23
05-Mar-23
12-Mar-23
19-Mar-23
26-Mar-23
1 Year
5 Years
10 Years
20 Years
30 Years
50 Years
8
Page 93 of 102

Page 94

Page 94 of 102

Page 95

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 JANUARY TO 31 MARCH 2023
APPENDIX II
1 LONG TERM BORROWING
(a) Long Term Borrowing 1st January to 31st March 2023
Average Average Amount
No. Rate (%) Life (years) (£)
None 0 0.00% 0.00 0
0 0.00% 0.0 0
(b) Long Term Debt Repayments 1st January to 31st March 2023
Average Amount
No. Rate (%) (£)
PWLB - Maturity Loan - Scheduled Repayments 1 4.22% 3,000,000
1 4.22% 3,000,000
(c) Long Term Debt Outstanding
Outstanding Average Outstanding Average
31-Dec-22 Rate 31-Mar-23 Rate
£ £
Public Works Loan Board 563,000,000 2.41% 560,000,000 2.40%
Money Market Loans (LOBO's) 43,200,000 4.59% 43,200,000 4.59%
Other Long Term Debt 140,000 0.00% 140,000 0.00%
TOTAL 606,340,000 2.56% 603,340,000 2.56%
2 SHORT TERM BORROWING
(a) Short Term Market Borrowing - 1st January to 31st March 2023
Average Average Average Interest
No. Amount (£) Rate (%) Term (Days) (£)
Temporary borrowing 1 3,000,000 4.00% 17 5,589.04
1 3,000,000 4.00% 17 5,589.04
(b) Short Term Borrowing Outstanding
Outstanding Average Outstanding Average
31-Dec-22 Rate 31-Mar-23 Rate
£ £
Market Borrowing 0 0.00% 0 0.00%
Common Good and Charitable Funds 2,131,508 1.14% 2,293,508 3.93%
Local Trusts & Investors 4,129,401 2.86% 3,117,401 3.63%
TOTAL 6,260,908 2.27% 5,410,908 3.76%
8
Page 95 of 102

Page 96

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 JANUARY TO 31 MARCH 2023
APPENDIX II
3 INVESTMENTS
(a) Investment Transactions - 1st January to 31st March 2023
Average Average Average Total
Fixed Deposits & Investments No. Amount (£) Rate (%) Term (Days) Interest (£)
Banks 3 8,333,333 4.50% 254 800,561.64
Foreign Banks and Institutions 5 5,000,000 3.87% 98 299,611.78
Other Local Authorities 6 7,000,000 4.47% 233 1,214,471.23
14 3,571,429 4.19% 176 2,314,644.66
Average Average Total
Instant/Notice Accounts & Money Market Funds Amount (£) Rate (%) Interest (£)
Instant Access/Notice accounts 425,895 1.38% 1,093.38
Money Market Funds 6,529,455 3.72% 89,379.33
4,377,559 3.64% 90,472.71
(b) Investments Outstanding Outstanding Average Outstanding Average
31-Dec-22 Rate 31-Mar-23 Rate
£ £
UK Banks 98,023,256 2.81% 99,650,000 3.42%
Foreign Banks and Institutions 88,000,000 2.95% 32,000,000 3.89%
Money Market Funds 1,650,000 3.28% 0 0.00%
Other Local Authorities 20,000,000 0.75% 42,000,000 4.47%
TOTAL 207,673,256 2.67% 173,650,000 3.76%
Page 96 of 102

Page 97

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Fitch Credit CDS Maximum
Country Rating Range Lending Note (2)
Category 1 - Principal UK Clearing Banks  -  40% Investment total (or £20M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Bank of Scotland (RFB) (5) UK A+, F1 In range 6 months £80million Group limit
Barclays Bank plc (NRFB) (5) UK A+, F1 No data 6 months
Barclays Bank plc (RFB) (5) UK A+, F1 In range 6 months
Goldman Sachs International Bank UK A+, F1 In range 6 months
Handelsbanken plc UK AA, F1+ No data 12 months
HSBC Bank plc (NRFB) UK AA-, F1+ In range 12 months
HSBC Bank plc (RFB) UK AA-, F1+ No data 12 months
Lloyds Bank Corporate Markets Plc (NRFB) UK A+, F1 No data 6 months £80million Group limit
Lloyds Banking Group plc (RFB) UK A+, F1 In range 6 months £80million Group limit
NatWest Markets Plc (NRFB) UK A+, F1 In range 12 months
Royal Bank of Scotland plc (RFB) (inc Nat West) (3) (4) UK A+, F1 Nationalised 12 months Sovereign Rating AA
Santander UK plc (inc Cater Allen) UK A+, F1 No data 12 months
Standard Chartered Bank UK A+, F1 In range 6 months
Sumitomo Mitsui Banking Corporation Europe Ltd UK A, F1 In range 6 months
Category 2 - Foreign Banks & Institutions -  25% Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Australia and New Zealand (ANZ) Banking Group Ltd Aus A+, F1+ In range 12 months
Commonwealth Bank of Australia Aus A+, F1+ In range 12 months
Macquarie Bank Ltd Aus A, F1 No data 6 months
National Australia Bank Ltd Aus A+, F1+ In range 12 months
Westpac Banking Corporation Aus A+, F1+ In range 12 months
BNP Paribas Fortis Bank Belgium A+, F1 No data 1 month Sovereign Rating AA-
KBC Bank Belgium A+, F1 No data 1 month Sovereign Rating AA-
Bank of Montreal Can AA-, F1+ No data 12 months
Bank of Nova Scotia Can AA-, F1+ No data 12 months
Canadian Imperial Bank of Commerce Can AA-, F1+ No data 12 months
National Bank of Canada Can A+, F1 No data 6 months
Royal Bank of Canada Can AA, F1+ No data 12 months
Toronto Dominion Bank Can AA-, F1+ No data 12 months
Danske Bank Denmark A, F1 In range 6 months
Nordea Bank Finland plc Finland AA-, F1+ No data 1 month Sovereign Rating AA+
BNP Paribas France A+, F1 In range 1 month Sovereign Rating AA
Credit Agricole Corporate and Investment Bank France A+, F1 In range 1 month Sovereign Rating AA
Credit Agricole SA France A+, F1 In range 1 month Sovereign Rating AA
Credit Industriel et Commercial France A+, F1 No data 1 month Sovereign Rating AA
DZ Bank AG Germany AA-, F1+ No data 12 months
Landesbank Hessen-Thueringen Girozentral (Helaba) Germany A+, F1+ In range 12 months
Landwirtschaftliche Rentenbank Germany AAA, F1+ No data 24 months
NRW Bank Germany AAA, F1+ No data 24 months
ABN AMRO Bank Netherlands A, F1 No data 6 months
Bank Nederlandse Germeenten Netherlands AAA, F1+ No data 24 months
Cooperatieve Rabobank Netherlands A+, F1+ In range 12 Months
ING Bank Netherlands AA-, F1+ In range 12 Months
DBS Bank Limited Singapore AA-, F1+ No data 12 months
United Overseas Bank Ltd Singapore AA-, F1+ No data 12 months
Skandinaviska Enskilda Banken AB Sweden AA-, F1+ No data 12 months
Svenska Handelsbanken AB Sweden AA, F1+ No data 12 months
Swedbank AB Sweden A+, F1 No data 12 months
UBS AG Switzerland AA-, F1+ In range 6 months
Bank of America, NA USA AA-, F1+ No data 12 months
Bank of New York Mellon USA AA, F1+ No data 24 months
Citibank, NA USA A+, F1 In range 12 months
JP Morgan Chase Bank, NA USA AA, F1+ No data 12 months
Wells Fargo Bank, NA USA AA-, F1+ In range 12 months
8
Page 97 of 102

Page 98

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Category 3 - Subsidiary Banks & Building Societies - 15% of Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
(parent bank shown in brackets)
Subsidiary Banks
None
Building Societies
Nationwide Building Society UK A, F1 No data 6 months
Category 4 - Other Local Authorities - 20% of Investment total (or £20M per Counterparty if higher)
As arranged
Category 5 Money Market Funds - 10% of Investment Total (or £10M per Counterparty if higher)
(Minimum rating required Fitch AAA)
Aberdeen Standard Investments UK AAA
Aviva Investors Liquidity Fund UK AAA
Federated Sterling Liquidity Fund (Class 3) UK AAA
Insight Sterling Liquidity Fund (Class 5) UK AAA
Note:
(1) - Standard & Poor's credit ratings shown, as no Fitch credit rating available
(2) - All Soveriegn credit ratings for above Countries are AAA, unless stated otherwise.
(3) - Banks are part/majority owned by the UK government
(4) - UK Sovereign Rating is AA (Fitch and Standard & Poor's)
Last Updated: 03-Apr-23(5) -  NRFB = Non Ring Fenced Bank,  RFB = Ring Fenced Ban
Page 98 of 102

Page 99

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - QUARTER ENDING 31 MARCH 2023
APPENDIX IV
1 Financing Costs:Net Revenue Stream
The ratio of Capital Financing Costs (Loan Charges) to the Council's net revenue stream shall not exceed the following limits, which are based on historic levels, and allow some headroom
for movement in interest rates. The estimated Financing Costs below are based on the latest monitoring figures.
2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Prudential Limit - General Fund 15.00% 15.00% 15.00% 15.00% 15.00% 15.00%
Estimated Ratio of Financing Costs to Revenue 6.44% 6.99% 8.27% 9.20% 9.46% 9.31%
Prudential Limit - HRA 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
Estimated Ratio of Financing Costs to Revenue 23.09% 23.06% 24.12% 24.28% 23.36% 23.79%
2 Gross & Net Borrowing and Capital Financing Requirements
For prudence, net external borrowing must not exceed the total capital financing requirement, thus ensuring that over the medium term, borrowing is only undertaken for capital purposes.
The estimated total net borrowing and Capital Financing Requirement at the end of each of the years are as follows:
Actual as at Projected Projected Projected Projected Projected
31-Mar-23 31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27 31-Mar-28
Net External Borrowing* 556,428,000 635,505,000 851,723,000 946,240,000 1,000,758,000 1,046,000,000
Gross External Borrowing* 730,078,000 769,155,000 980,373,000 1,074,890,000 1,129,408,000 1,174,650,000
Capital Financing Requirement 686,809,000 831,024,000 998,696,000 1,095,645,000 1,150,574,000 1,195,330,000
*For the purpose of this indicator, Borrowing includes the outstanding liability under PPP/PFI contracts.
3 Estimates of Gross Capital Expenditure
The total estimated Capital Expenditure contained within the Council's Budgets for each year is as follows, based on updated monitoring figures.
Composite Programme 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Current estimate 116,091,000 199,696,000 196,624,000 111,024,000 67,408,000 48,605,000
Original Budget Estimate (including Budget Motion) 176,562,000 173,493,000 126,749,000 61,376,000 52,519,000 43,737,000
Movement in Estimated Capital Expenditure (60,471,000) 26,203,000 69,875,000 49,648,000 14,889,000 4,868,000
The Original Budget Estimates are those per the 2022/23 to 2027/28 Composite Capital Budget Report on 23 February 2022
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 26 April 2023.
HRA Programme 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Current estimate 18,180,000 20,422,000 13,853,000 15,519,000 19,044,000 16,500,000
Original Budget Estimate 17,299,000 15,983,000 13,886,000 20,085,000 16,044,000 16,500,000
Movement in Estimated Capital Expenditure 881,000 4,439,000 (33,000) (4,566,000) 3,000,000 0
The Original Budget Estimates are those per the 2020/21 Housing & Communities Budget Report on 24 January 2022.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 26 April 2023.
8
Page 99 of 102

Page 100

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - QUARTER ENDING 31 MARCH 2023
APPENDIX IV
4 Estimate of Capital Financing Requirement
The estimate (as at April 2023) of the Capital Financing Requirement (ie new borrowing requirement for Capital Expenditure) for each year based on these plans is as follows:
Composite Programme 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Current Estimated Capital Financing Requirement 71,510,000 150,387,000 176,527,000 92,516,000 46,776,000 25,377,000
Original Budget Estimate (including Budget Motion) 140,264,000 137,906,000 106,775,000 41,581,000 34,804,000 26,067,000
Movement in Estimated Capital Financing Requirement (68,754,000) 12,481,000 69,752,000 50,935,000 11,972,000 (690,000)
The Original Budget Estimates are those per the 2022/23 to 2027/28 Composite Capital Budget Report on 23 February 2022
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 26 April 2023.
HRA Programme 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
Current Estimated Capital Financing Requirement 15,528,000 18,367,000 11,935,000 13,271,000 16,524,000 13,750,000
Original Budget Estimate 14,685,000 13,338,000 10,557,000 16,125,000 11,765,000 12,000,000
Movement in Estimated Capital Financing Requirement 843,000 5,029,000 1,378,000 (2,854,000) 4,759,000 1,750,000
The Original Budget Estimates are those per the 2020/21 Housing & Communities Budget Report on 24 January 2022.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 26 April 2023.
5 External Debt (Gross and Net)
As at Projected Projected Projected Projected Projected
External Borrowing 31-Mar-23 31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27 31-Mar-28
Public Works Loan Board 560,000,000 605,000,000 822,000,000 922,000,000 982,000,000 1,032,000,000
Market Bonds (LOBOs) 43,200,000 43,200,000 43,200,000 43,200,000 43,200,000 43,200,000
Project Borrowing 140,000 0 0 0 0 0
Special Loans 2,293,508 2,293,508 2,293,508 2,293,508 2,293,508 2,293,508
Temporary Loans/Other Borrowing 3,117,401 2,817,401 2,517,401 2,517,401 2,517,401 2,517,401
Other Long Term Liabilities (PPP/PFI) 121,326,977 115,844,477 110,361,977 104,879,477 99,396,977 94,639,577
Total Gross External Debt 730,077,885 769,155,385 980,372,885 1,074,890,385 1,129,407,885 1,174,650,485
Short Term Investments (173,650,000) (133,650,000) (128,650,000) (128,650,000) (128,650,000) (128,650,000)
Long Term Investments 0 0 0 0 0 0
Total Net External Debt 556,427,885 635,505,385 851,722,885 946,240,385 1,000,757,885 1,046,000,485
Note:
Operational Boundary 730,000,000 769,000,000 980,000,000 1,075,000,000 1,129,000,000 1,175,000,000
Authorised Limit 1,200,000,000 1,200,000,000 1,200,000,000 1,200,000,000 1,200,000,000 1,200,000,000
The Operational Boundary and Authorised Limit are based on Gross External Debt.
Page 100 of 102

Page 101

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - QUARTER ENDING 31 MARCH 2023
APPENDIX IV
6 Principal Sums Invested Longer Than 365 Days
The Upper Limit for sums invested for over 1 year up to 3 years is £45 million. There were no amounts invested within this period as at the end of the quarter.
7 MATURITY STRUCTURE
The lower and upper limit for the proportion of the Council's total-long term debt which matures in each of  the time bandings below, and is therefore subject to refinancing at the
prevailing market rates, is as follows:
Borrowing Maturity Structure Lower Limit Upper Limit Estimated
Under 12 months 0% 35% 0.76%
over 12 months and < 24 months 0% 35% 1.45% Expand the Over 10 y
over 2 years and < 5 years 0% 50% 6.02% Should also include v
over 5 years and < 10 years 0% 75% 7.58% Include para in report
over 10 years 10% 95% 84.20%
The maurity profile for the Council's current long-term portfolio as at 31st Decmber 2022, measured from the start of the financial year, is as follows:
Less 1 Year 1 - 2 Years 2 - 5 Years 5 - 10 Years 10 - 20 Years 20 - 30 Years 30 - 40 Years 40 - 50 Years Over 50 Years Total
PWLB 0 5,000,000 23,000,000 27,500,000 5,000,000 0 40,500,000 459,000,000 0 560,000,000
LOBOs 0 0 0 0 0 13,000,000 25,200,000 5,000,000 0 43,200,000
Other 0 0 140,000 0 0 0 0 0 0 140,000
PPP/PFI Liability 5,482,500 5,482,500 20,479,800 27,435,800 62,446,377 0 0 0 0 121,326,977
Total 5,482,500 10,482,500 43,619,800 54,935,800 67,446,377 13,000,000 65,700,000 464,000,000 0 724,666,977
Percentage 0.76% 1.45% 6.02% 7.58% 9.31% 1.79% 9.07% 64.03% 0.00% 100.00% diff
Page 101 of 102

Page 102

Page 102 of 102