Appendix 1
CDS BMIP 2022-23 Page 1

Page 2

Appendix 1 
CDS BMIP 2022-23  Page 2 
Contents Page
Introduction 3
Vision, Strategic Objectives and Service Priorities 
CDS Performance 2021-22 and Priorities 2022-23 
4
5-22
• Getting the Basics Right
• Developing People, Skills, and Capacity
• Exploiting Digital Opportunities and Data Insight
• Protecting our Physical and Information Assets
• Improving our Customers’ Experience
• Working Smarter 
Organised to Deliver
• Governance and Management Structure of the Service
• Customer Focus and Community Engagement
• Preparing our People for the Future
• Partnership Working
• Financial and Resource Management
• Performance, Self-Evaluation, and Risk Management
23-31
Key Performance Indicators
• Corporate Performance Indicators 
31-32

Page 3

Appendix 1 
CDS BMIP 2022-23  Page 3 
INTRODUCTION   
Welcome to the 2022-2023 Business Management and Improvement Plan
for Corporate & Democratic Services. I am delighted to share highlights of
the work carried out by Corporate & Democratic Services (CDS) over the
last year and to set out our priorities for the year ahead. 
Much of our efforts last year continued to be dominated by our response
to the global pandemic. Teams across CDS have shown outstanding
commitment, compassion, resilience, and creativity to channel their skills,
knowledge, and abilities to help the most vulnerable in our communities,
to support businesses and to keep the organisation functioning. As public
health restrictions have eased, we have supported staff to move to hybrid
working, continuing to learn new digital skills, and to adapt our work
practices which ensure the health and safety of everyone. We have
ensured elected members were able to maintain democratic oversight and
decision- making which is at the heart of local government. And of course,
we have been preparing to welcome newly elected and returning elected
members to the Council following the Local Government elections. 
This plan is an extension of our 2021-22 Business Management and
Improvement Plan, with continuing progress in our improvement work.
Our priorities will focus on addressing the financial challenges facing our
communities and the Council, and supporting the organisational wide
programme of transformation and change, both of which are inextricably
linked 
This Plan sets out how CDS will support delivery of the Council’s corporate
objectives and priority outcomes; achieving financial sustainability and enabling
change and transformation, especially through the Perth and Kinross Offer; and
our commitment to continue to deliver high quality services despite the significant
challenges we face as an organisation. 
Karen A Donaldson

Page 4

Appendix 1 
CDS BMIP 2022-23  Page 4 
VISION, STRATEGIC OBJECTIVES AND
SERVICE PRIORITIES 
Vision: We support the Vision of the Community Planning Partnership, for our
area:
“Creating a confident, ambitious, and fairer Perth and Kinross, for all -
who live and work here.” 
This Plan aims to translate this vision into an agenda for CDS to
deliver positive     outcomes for our citizens and communities by
supporting the Perth and Kinross Officer and working together so
everyone in Perth and Kinross can live life well. 
Strategic Objectives: 
The Council’s five strategic objectives, outlined in the current
Corporate Plan, inform   decisions about policy direction and budget
spending: 
• Giving every child the best start in life
• Developing educated, responsible, and informed citizens
• Promoting a prosperous, inclusive, and sustainable economy
• Supporting people to lead independent, healthy, and active lives
• Creating a safe and sustainable place for future generations. 
CDS connect and collaborate with Services, Partners, and Communities
as enablers for the Perth & Kinross Offer and delivery of the Council’s
strategic objectives.

Page 5

Appendix 1 
CDS BMIP 2022-23  Page 5 
CDS Key Priorities
GET THE
BASICS
RIGHT
PEOPLE,
SKILLS,
CAPACITY
DIGITAL &
DATA
PROPERTY &
INFORMATION
ASSETS
CUSTOMER
EXPERIENCE
SMARTER
WORKING 
This section uses case studies to convey the breadth and depth of activity
across the Service, providing insight into what we do and the impact we
have. It also sets out priorities for 2022/23.   
Getting the Basics Right 
This matters because CDS provides the Council’s strategic management of
corporate resources - being people, finances, property, ICT and digital, and
information assets. It maintains the Council governance framework and system of
internal control, ensures legal and regulatory compliance, effective scrutiny, and
accountability in respect of Council decision-making. 
Performance Summary for 2021/22
The Council continues to operate in a particularly challenging financial
environment characterised by pressures on Council funding, growing
demand for Services and increasing inflation on the cost of service delivery
and capital investment. 
The Finance team developed a long-term funding strategy to enable the
Council to approve a 6-year funded Capital delivery programme for 2022/23
- 2027/28 with provision for £155m of additional Capital investment,
including the PH2O project. Through pro-active treasury management,
annual savings of around £700,000 per annum were secured on the
Council’s borrowing for Capital investment. Working with Services across
the Council, the Council’s Medium Term Financial Plan was updated in
November 2021; the 2020/21 financial statements approved and audited by
September 2021 and elected members were supported in setting the
Revenue and Capital budgets in February 2022. In conjunction with the
Council’s Economic Development teams and Local Taxes & Benefits team,
approximately £25m of business grant support was distributed to local
businesses and a further £6m to individuals and families in welfare
payments in 2021/22.

Page 6

Appendix 1 
CDS BMIP 2022-23  Page 6 
The Procurement Team have supported the tendering for major projects,
such as the Cross Tay Link Road and the replacement social care case
management system. The Team were category winners at the Go Awards
Scotland and received national recognition for their work on community
benefits, being highly commended in the Social Value category.
Getting the “governance basics” right ensures lawful, ethical, and effective
decision- making at all levels. It creates and supports an organisational
culture that is risk aware, commercially aware, solution focussed and legally
compliant; ensuring that the Council not only does the right things but does
things right. 
A review of the Democratic Services Team was completed in 2021-22 and a
leaner management structure is now in place. Our Registrars Team
continued to provide a compassionate and professional service, as well as a
successful relocation to the Council Building. Our Licensing Team supported
businesses with the ability to trade during difficult conditions. 
Throughout the pandemic period involving working from home, the HR Team
have ensured that staff and elected members continued to be paid
accurately and on time, processing back-dated pay awards and additional
Scottish Government additional Covid Thank You payments to staff
timeously. Statutory returns have been completed with accuracy and on
time. 
Case Study: Supporting the Community 2021-22
The year ending 31 March 2022 was the second year of the COVID-19
pandemic and the citizens and communities of Perth and Kinross continued
to need additional support to help mitigate the impacts of the health crisis.
Effective collaborative working between Revenues & Benefits, Finance and
Economic Development Service ensured the Council made the best use of
funds provided to tackle financial insecurity and to provide timely support to
businesses and households. 
Over the last two years, the benefits and grants landscape became
increasingly more complex. New support arrangements were introduced by
government including Business Grants, Self-Isolation Support Grants, Low
Income Pandemic Payment, Cost of Living Awards, Financial Insecurity
Funding, which were in addition to traditional support like Housing Benefit
and Crisis Grants. Despite the complexity and additional administrative
burden, grants and benefits have been provided to the communities of Perth
and Kinross in 2021-2022 as set out in the table below.

Page 7

Appendix 1 
CDS BMIP 2022-23  Page 7 
A 20% growth in the number of rateable lands and heritages in Perth and
Kinross over a five-year period, the growing financial pressure on businesses
and the passing of the Non-Domestic Rates (Scotland) Act 2020 (the first
rating Act since 1975) highlighted how Non-Domestic Rates can be used to
deliver support to businesses. In addition to grant payments, a total of
£23.6m was awarded in rates relief and reductions in 2021-22.
The Welfare Rights and Scottish Welfare Fund Team continue to support our
citizens and communities with welfare benefit advice, representation, and
payment of support grants. The team’s efforts generated a minimum of £5.3
million in benefit gains which went directly in the pockets of Perth and
Kinross residents. The team assisted around 5,000 households and had a
Benefit appeals success rate of 84%. 
A summary of the key support payments and activity range is shown below: 
Activity £ Volume
Housing Benefit £19.80m 4,900
Council Tax Reduction £6.80m 8,600
Self-Isolation Support Grants £1.46m 5,154
Low Income Pandemic Payment £1.30m 9,968
Discretionary Housing Payments £0.85m 3,002
Community Care Grants £0.72m 1,478
Crisis Grants £0.43m 5,286
Financial Insecurity Fund TBC 995 
Case Study: Upgrade of Building Management Systems (BMS)
In 2020, the Property Services instructed works to over 70 sites with BMS. System
software was amended, and new controllers installed on site to maximise plant
efficiency, reduce energy consumption, reduce carbon emissions, and improve site
comfort levels. An investment of £300,000 included the upgraded remote monitoring
system which was adapted to maximise analysis and improve data management of
the sites. Alarm functions were also adapted to increase system performance and
improve compliance of the property estate portfolio.

Page 8

Appendix 1 
CDS BMIP 2022-23  Page 8 
Savings and key success factors to date from August 2021 to May 2022 are as
follows:
• Reduction in energy Consumption - 2,137,902 kWh 
• Reduction in CO2 emissions - 347 tonnes. (35% of annual savings target)
• Cost reduction - £70,000 (ROI will be achieved in under 4 years)
By 2024, the target is to have 100 sites remotely connected to the system, further
reducing energy consumption, CO2 emissions and energy costs. 
These good practice principles for energy management have delivered financial
savings that have been diverted to support frontline services. We are recognised as
a leading council in energy and carbon reduction through the Chartered Institute of
Public Finance and Accountancy (CIPFA) annual benchmarking exercise.
CDS Priorities for 2022/23
An external review during the first part of 2021 highlighted many strengths across the
Council’s finance function. It also focussed on opportunities to enhance its value
contribution through investment in systems, processes and people and the
development of a Financial Strategy which will inform the budget setting process
over the next 5 years. The Financial Strategy is being developed in tandem with the
new Transformation and Change Strategy to help address the financial challenges
facing the Council.
One of the four elements of Transformation and Change will be re-structuring and
consolidation of dispersed corporate activities. This will include a review of the
Finance functions which will focus on the consolidation of resources and the
streamlining and modernisation of processes. 
The new Democratic Service team are looking forward to working with the
newly elected council to facilitate smooth and effective governance and
improved decision-making. To better support our elected members, a
comprehensive induction and member development programme has been
developed. Open and transparent democratic decision-making is a key
element of effective governance. We will review governance arrangements to
ensure that the democratic service is modern, efficient, effective, and
accessible to the public; continuing to live stream Council and Committee
meetings, developing the capacity to facilitate hybrid (virtual/in person)
meetings, and adapting our procedures, processes, systems, and structures
to ensure that we can deliver the best possible service.
The ongoing health, economic and social situation arising from the Covid 19
pandemic continue to affect businesses and our communities. Significant
increases in the cost of living, with inflation reaching a 40 year high of 9% and
forecast to rise higher, increasing food prices and further rises in the energy

Page 9

Appendix 1 
CDS BMIP 2022-23  Page 9 
price cap are placing acute pressures on households and businesses. The
demand levels for customer services, welfare support and advice, crisis
grant applications and other financial support schemes is therefore
expected to continue to rise. It is anticipated our communities will continue to
require support for some time to come, especially as COVID-19 related
government financial support schemes end. 
Developing People, Skills, and Capacity 
This matters because people are our most valuable assets. The last two years
have demonstrated that skilled, motivated people with a can-do approach make
a difference to the lives of those who live, work, and learn in Perth and Kinross.
The wellbeing of staff is paramount. Staff have been flexible and agile in meeting
the many challenges thrown down by the pandemic. We need to attract and retain
staff with the values, skills and behaviours which are critical to success; ensure
our employment offer remains competitive and employ a diverse and inclusive
workforce. 
Performance Summary for 2021/22
The Council is proud to be a Fair Work employer and to retain Living Wage
Accreditation.  We continue to apply the Fair Work principles of Effective Voice,
Opportunity, Security, Fulfilment and Respect. We consult and engage with
employees and recognised trade union representatives when developing or
improving our employment practices and arrangements, many of which were
adapted during the Covid pandemic. The procurement strategy requires fair work
practices, including the Living Wage, and underpins our work with partner providers
and commissioned services. 
We have continued to support the health and wellbeing of our employees through
practical support, practices, and opportunities for learning, ensuring our people
develop their capacity and resilience to deliver services. A new Employee
Assistance Programme called PAM (People Assist Management) Assist which
provides confidential counselling for employees, with 24/7 access to qualified
counsellors for any psychological problems.
Case Study: Developing Our Young Workforce and Career Pathways
HR worked with apprentices, trainees, and their supervisors to design a new
way of working that would provide the support they required during induction
and throughout their training, whilst continuing to meet the stringent
requirements of the Scottish Qualifications Agency (SQA) and Skills
Development Scotland upon which our funding is reliant.

Page 10

Appendix 1 
CDS BMIP 2022-23  Page 10 
Apprentice/Trainee Teams chats were created, and regular Connections
events continued providing opportunities for networking and personal
development. These were supplemented by 1 to 1 meetings with both
apprentices and their supervisors focused on achieving the qualification as
well as personal wellbeing and additional support needs.
One of the key aims of our apprenticeship and trainee programmes is to
address current and anticipated skills shortages through the development of
apprenticeship and trainee programmes and the creation of career paths for
trainees. The increase in Early Years provision has resulted in the
recruitment of additional Modern Apprentices in this area. Tailored
Connections events and development activities were jointly designed and
organised to support supervisors who were new to the PKC programmes and
to help them best support their trainees and apprentices. 
In Adult Social Care, a new Service Level Agreement has been introduced to
strengthen the delivery model. Plans are also in place to introduce a
mentoring programme, group recruitment and induction to support
networking and share good practice which will support our apprentices to
develop careers in adult social care.
Three new Graduate Apprenticeships in Road Building and Maintenance
have provided career development opportunities for current staff which
helped retain skills and experience, thereby enhancing in-house capacity and
avoiding a recruitment exercise in what is a competitive skills market.
CDS Priorities for 2022/23
We are proactively working with all Services to enable them to make informed
decisions about their workforce requirements to ensure they are fit for the
future.  We are committed to creating a dynamic HR Delivery model to support
the Council’s Transformation & Change Programme, ensuring agile and efficient
HR support is available in the right place at the right time to enable smarter working
across the Council.  We have committed to building a framework to create greater
mobility and flexibility in our workforce, embracing digital advances in technology
and developing our employment offer to clearly articulate the values and behaviours
developed as part of the Perth and Kinross Offer.
Supporting the health and wellbeing of our employees remains a key priority as
the organisation continues to adapt and incorporate the lessons of the pandemic to
ensure the effective delivery of services to the people of Perth and Kinross. The
ongoing impact of the pandemic on employee mental and physical health will remain
an area of focus and more general health and wellbeing issues will also be a key
priority to identify and address. Our activity will be directed using data from sickness

Page 11

Appendix 1 
CDS BMIP 2022-23  Page 11 
absence reports and from employee feedback which will be gathered directly from
individual conversations, our DisABILITY employee network, employee surveys and
other engagement activity. Health and Wellbeing is integral to the priorities in
our Corporate Workforce Plan 2021-23.
We will use external frameworks to access resources and ideas and to ensure that
our progress can be measured using acknowledged best practice; we have signed
up to the Development stage of the Equally Safe at Work programme, part of the
Scottish Government’s strategy to eradicate violence against women and girls and
will take forward an action plan of education and support to achieve this standard. 
Exploiting Digital Opportunities and Data Insight 
These matter because digital technology and information continue to underpin
every service in the organisation and are strategic enablers which will establish new
frontiers for how the Council delivers services in the future. Pioneering data
analytics and visualisation tools will enable us to use data to tell a compelling story
and provide colleagues and elected members with evidence to make better
financial, strategic, and policy decisions. 
Performance Summary for 2021/22
The full fibre infrastructure, delivered via the Tay Cities Local Full Fibre Network
(LFFN) project, is now in place.  Focus has now moved to “lighting up”
connections to dispersed Council offices and schools, to provide secure access to
centrally stored systems and Internet resources. It is anticipated that this work will be
completed for most connections by the end of 2022.
The cross-disciplinary Digital Participation Working Group, chaired by the
Chief Digital Officer, brings together Services and external partners to
promote opportunities for helping citizens at risk of digital disadvantage. The
Group has been instrumental in facilitating training for a network of local
digital champions; investing in loan laptops for citizens’ use; and funding a
range of creative digital projects nominated by local community groups via a
Digital Inclusion Fund. Research into levels of digital participation across
Perth & Kinross has been commissioned to baseline the local position and
inform future digital participation initiatives
Following a competitive tendering exercise to replace the SWIFT Social Care
Case Management system, a contract was entered into with the Servelec
Access Group in February 2022 for the supply of their MOSAIC Social Care
Case Management product.

Page 12

Appendix 1 
CDS BMIP 2022-23  Page 12 
Case Study: Data Literacy
Data literacy can be defined as the ability to work with data – to capture and
maintain it correctly, to analyse it, to use it to gain insight and to
communicate with it effectively. Data literacy improvement is important for
any organisation seeking to make better use of data. Recognising this, our
Data & Analytics programme incorporates high-level objectives to improve
data literacy across the organisation.
The Council’s data literacy improvement plan sets out a blended approach to
improvement; it started with an initial assessment of data literacy across
council services, using an online questionnaire supplemented by workshops
with various staff groups. This assessment was used to establish a baseline
and inform approaches to improvement.
A key element of the improvement plan is communications and engagement,
to ensure that staff are generally ‘data aware’. The festive period of 2021
provided an ideal opportunity to run a communications campaign which
provided information about the data and analytics programme in a light-
hearted, non-technical and innovative way under the banner ‘12 Days of
Data’. 
PKC research identified that while data literacy improvement is an emerging
area of interest, there is little in the way of mature best practice examples. 
The 12 Days of Data campaign set out to address feedback that data and
analytics related communications are often perceived to be overly technical
and difficult to understand. It used non-technical language and Microsoft
Teams based channels that staff were already comfortable with. The main
learning point being that data and analytics is relevant to everyone and is not
just for the specialist.
Feedback from the 12 Days of Data campaign has been positive, with high
levels of interaction with the daily posts on MS Teams. The use of a seasonal
theme encouraged engagement and each of the daily posts over the 12 days
incorporated a small snapshot of information that was easier to digest than
longer, more formal learning materials.
The campaign also encouraged staff to visit our MS Teams Data Centre
channel, building a community which will go on to participate in future data
literacy improvement activities. This will include the development of targeted
data literacy learning pathways and training modules, and of course further
awareness raising communications.

Page 13

Appendix 1 
CDS BMIP 2022-23  Page 13 
CDS Priorities for 2022/23
Our COVID experience underlined the importance of our whole-Council mobile
working and online services platforms to front line services and integrated working.
We will continue to develop and improve these platforms to empower staff working in
our communities to capture, access and exchange the data they need, while on the
move and to provide anytime / anywhere access to a wider range of quality online
services.
Technology has never been more important for shaping and delivering
services; evolving our hybrid working model; and communicating with each
other, with citizens and partners. How we are developing our ICT / digital
infrastructure, capabilities, capacity, leadership, and skills matters more
than ever. A fresh, fit for the future Digital Strategy continues to be
developed, against the backdrop of post-COVID remobilization; the
maturing Perth & Kinross Offer and the emerging Transformation and
Change Programme. 
Implementation of Mosaic as the Council’s new social care platform is opening
new opportunities for streamlining processes; and information sharing between
Services and support partners, like the NHS. This means re-thinking the way we
work to develop this key business system as a tool to be used by citizens to engage
meaningfully with us, rather than a tool we use to do things for them. The Mosaic
programme team is working towards a potential go-live date in September / October
2023
Perth & Kinross Council is increasingly adopting cloud solutions at points of
change, with the pace of this migration accelerating because of commercial
decisions by vendors to make new / updated business systems only
available as cloud services. Cloud solutions offer potential for increased
business system flexibility, scalability, and agility to enable our new hybrid
working model. Migrating a system to the cloud requires a collaborative
approach between Services, Information Security; Data Protection and IT to
ensure the cloud / hosting arrangements we sign up to keep our data safe,
accessible, reportable, and recoverable. The whole cloud “lifecycle”, from
acquisition / migration to repatriation of data at the end of a contract needs to
be managed and monitored. One key system moving to a cloud-based
solution is the integrated HR and Payroll system ‘ResourceLink’.This is
due to be migrated over the summer of 2022.
The Council’s Data and Analytics (DA) programme continues to build the capacity
and create the capabilities necessary for introducing new technologies. These tools
are starting to be used effectively and delivering benefit.

Page 14

Appendix 1 
CDS BMIP 2022-23  Page 14 
An example is Power BI - Covid Cases Daily Report. In mid-2021, Covid case
numbers started rising rapidly again, and there was a need for fast and easy access
to the most accurate case figures to aid the Council and Health & Social Care
Partnership’s response and resilience planning. A Power BI report was developed by
the IT Data Services team to provide both daily headline case figures and a series of
interactive visualisations which can be used to understand and analyse case
numbers by neighbourhood, demographics, and time. 
The Power BI Covid Cases – Daily Update is highly innovative and illustrates the
new capabilities now available as outputs from the data and analytics programme.
Interactive Power BI visualisations which are easy to interpret and understand
used trustworthy data extracted from NHS source automatically using new data
pipelines. 
Our work is continuing from a proof-of-concept solution, illustrating how we can build
data insight using Microsoft Power BI – the Council’s new analytics platform. 
Protecting our Physical and Information Assets 
These matter because our property and infrastructure assets (including schools,
houses, offices and depots, and other infrastructure) are an integral element of
effective service delivery and capital funding stimulates development and
regeneration in local areas. Our information is also a valuable business asset,
critical to effective strategic and operational decision-making across the
organisation.

Page 15

Appendix 1 
CDS BMIP 2022-23  Page 15 
Performance Summary for 2021/22
Case Study: Records and Information Security 
We implemented successfully the Corporate Digital Platform programme,
which was a multi-faceted project, designed to streamline and modernise
paper processing activities across the organisation and ensure compliance
with our legal requirements in terms of public records management. This
programme delivered a digital mailroom and introduced hybrid mailing
resulting in financial savings, efficiencies, and a reduction in use of paper. It
also included the design and delivery of an Electronic Document
Management System (EDMS) and the ongoing digitisation of paper records. 
Successful delivery of a corporate EDMS was a fundamental element of the
Council’s Records Management Plan, which is submitted to the Keeper of
the Records of Scotland (the Keeper) to ensure compliance with obligations
under the Public Records (S) Act 2011 (PRSA 2011). The EDMS will keep
the council on track as a “digital by default” organisation, producing savings
in electronic storage and legacy file server systems. EDMS supported the
delivery of services during the pandemic by enabling access to files from
remote work locations and own devices and will be integral to the success of
new hybrid working models. 
On receipt of the Council’s progress update review (PUR), the Keeper’s team
commended PKC on continued compliance with both the spirit and letter of
the PRSA obligations. The Keeper’s team was especially pleased that PKC
has not only implemented EDMS but had approved records retention across
the Microsoft 365 platform. 
The next phase of the EDMS project will focus on records management
capability within Business Systems. 
We have continued to make strides in improving the council’s cyber
resilience considering the current heighted risks. Over the last year, we have
implemented a Cyber Incident Response plan (CIRP) and Incident Response
Team. This includes several cyber-attack playbooks. 
Continuing measures to enhance our cyber-resilience include:
• Procurement of phishing simulation software
• Senior management and elected member cyber security exercises and
briefings by the Scottish Business Resilience Centre

Page 16

Appendix 1 
CDS BMIP 2022-23  Page 16 
• Cyber Response plan testing 
• Cyber maturity assessment by Quorum Cyber who are the Security
Operations Centre partner 
• Revise business continuity plans with a focus on cyber resilience
• Building in-house expertise through a staff member undertaking a cyber
security degree (which is fully funded by Skills Development Scotland),
and recruitment of a cyber graduate apprentice 
Case Study: Riverside Primary School 
The new Riverside primary school is set to be one of Scotland’s first
Passivhaus certified primary schools. The move to Passivhaus
certification in our schools is in response to the Climate Change Strategy
and Action Plan adopted by Perth & Kinross Council in December 2021. 
The internationally recognized Passivhaus standard delivers buildings
with a much lower reliance on operational energy than the typical
standard in Scottish construction. It delivers this through rigorous quality
control processes and technical requirements during both design and
construction. The Passivhaus standard helps lower our CO2 emissions
and gives us the assurance that Perth and Kinross Council will meet the
energy requirements for funding set by the Scottish Futures Trust (SFT)
Learning Estate investment programme (LEIP).

Page 17

Appendix 1 
CDS BMIP 2022-23  Page 17 
Passivhaus not only sets a construction standard which PKC will need to
attain in its move to a zero-carbon estate, it also moves us towards
delivering on the construction quality outcomes as highlighted in the Cole
report in 2017. To deliver better quality assurance and control, the report
recommended independent third-party quality checks and better design
team integration throughout the project stages. Passivhaus is the only
independent certification scheme which delivers both. 
The school is currently on site, with completion in spring/summer 2023.
Case Study: Maintenance & Investment Team
There has been an increase in maintenance demand via our Help Desk (HD
Requests) since lockdown and an increase in volume of maintenance delivered
since the pandemic. This challenge has been met by the team with a positive
attitude and transparent discussion with clients, resulting in no major failures or
disruptions to Service delivery (through building availability) across the Council. 
Close working relationships and proactive budget management within first quarter of
2021/22 realised £350k of energy savings due to effective energy management to
fund a backlog of Cemetery walls issues that were needed to ensure public safety.
These works are progressing in conjunction with Bereavement Services.
The Unpaid Work Team have been working closely with Maintenance teams and
communities to make best use of available budgets and in the spirit of the Perth &
Kinross Offer. Together, we have painted several community facilities at minimal
cost, to the satisfaction of the Community groups. 
0
2000
4000
6000
8000
10000
£0.00
£500,000.00
£1,000,000.00
£1,500,000.00
£2,000,000.00
£2,500,000.00
2015 2016 2017 2018 2019 2020 2021
No. Of HD Requests
Value (£)
Years
Reactive Maintenance Summary
Budget Spend HD Requests

Page 18

Appendix 1 
CDS BMIP 2022-23  Page 18 
Case Study: Ventilation Improvements and Installation of CO2 monitors.
Following lockdown in March 2020, Property Services commenced an exercise of
surveying all PKC buildings. This exercise assessed the adequacy of existing
ventilation arrangements to be able to mitigate the risks of Covid-19. The surveys
identified several actions, including re-programming of existing ventilation systems,
repairing windows, accelerating servicing of equipment, and installing additional
ventilation in numerous buildings to ensure they could be put into operation safely.
These actions were all undertaken in accordance with Industry and Scottish
Government Guidance available at the time.
In tandem with this exercise, the team also used Integrated Environmental Solutions
(IES) dynamic modelling software to ensure the ventilation strategy adopted for each
building would be effective. During this process and through dialogue with Scottish
Futures Trust and the Scottish Government, Perth & Kinross Council were identified
as one of the leading Councils with a well-developed strategy to mitigate the impact
of Covid -19 within its operational buildings.
As such many of the actions suggested by Scottish Government in their document
‘Coronavirus (Covid –19): guidance on reducing the risks in schools were developed
by the Council’s Energy and Engineering Team. In collaboration with Education &
Children’s Services and installation contractors, the team were also key drivers in the
successful CO2 monitor roll out across schools to meet Scottish Government
targets. The Council was one of the few Councils to fully meet the initial Scottish
Government target of 1 device per teaching and learning space. The early data from
this exercise was again used by the Scottish Government to develop their ongoing
strategy to ensure an appropriate response to the Covid –19 pandemic.
CDS Priorities for 2022/23
Maintaining / Improving our Property Estate: Over the last two years, Property
Services was diverted from much of its capital works to deal with essential
covid safety measures across the estate. There has been an escalation of
maintenance demand due to pent up issues during lockdown, remobilisation
of properties, overall estate condition and complexities in working in Covid
environment. The focus for 2022/23 is managing the increasing demand for
maintenance within available budgets. An escalation in contract costs tied
to CPI (Consumer Prices Index) combined with national supply chain
difficulties with materials and resource supply will also bring significant
challenges. National tender price inflation is affecting contracts planned to be
awarded in 2022/23 and the amount of work deliverable in current / future
planned programmes. 
Cyber-attacks are increasing in prevalence and in the potential damage they
can do. Our security landscape is continuously evolving to anticipate and
prevent unauthorised intrusion, to keep our valuable information assets

Page 19

Appendix 1 
CDS BMIP 2022-23  Page 19 
secure. CDS is partnering with external specialists to implement a managed
24/7 Cyber Security Operations Centre (SOC). This will significantly
enhance our security capacity and capabilities for early threat detection,
containment, response, and remediation.  Encompassing the use of
automated machine learning and advanced modelling techniques to combat
cyber-attacks, our SOC will put us at the forefront of threat protection in the
Scottish public sector and help us keep pace with emerging threat advances,
deliver 24-hour monitoring, provide early warning of possible rogue activity
and trigger professional, informed incident responses to suspected threats. 
Our IT infrastructure and networks protect our systems with up-to-date cyber-
security measures and have PSN (Public Service Network) accreditation. 
The move towards achieving the Scottish Government targets of net zero by 2045
and intermediate reduction targets before then, requires to be embedded in all
corporate decision making. CDS will be involved in facilitating the necessary
changes in practices to achieve these statutory targets. 
Improving our Customers’ Experience 
This matters because, like getting the basics right, our external and internal
customers expect to have an excellent experience when they use our services.
Our internal processes need to be lean providing efficient, timely and accurate
information to our customers at first point of contact and throughout the duration
of their interaction with the Council. Our ambition is to continue to embrace the
Customer Service Excellence Model.
Performance Summary for 2021/22
Case Study: Procurement Team and Community Benefits 
As part of our Sustainable Procurement Policy, the Procurement Team ask
suppliers to work in partnership to support local communities in a real and
sustainable way, thereby creating a positive social impact from contracted
spend.  In recognition of our creative, community-focussed approach to
Community Benefits in Procurement, the Procurement Team were winners of
the “Social Value” category in the 2020 National Procurement Awards –
Scotland’s leading public procurement awards.  This was followed up with a
Highly Commended award at the 2020/21 UK National GO Awards.

Page 20

Appendix 1 
CDS BMIP 2022-23  Page 20 
To help both communities and suppliers get the best out of community
benefits, we created an innovative way for local organisations to ask for what
they needed – the Community Benefits Wish List. Local communities can
add to the Wish List using our online Community Benefits Wish List form,
explaining what they need for example, sponsorship, donations of material or
labour, presentations, work experience placements, etc. A list of all current
requests on the Wish List is published on our procurement pages, alongside
an interactive map showing the location of the requests. This offers suppliers
a straightforward way to connect with communities and organisations who
have a defined need and to be able to identify the type of benefits they, as a
contractor, could supply.  
To date, a wide-ranging array of benefits have been delivered by suppliers,
including placements for prison leavers, financial support for local charities,
employment opportunities and careers workshops for young people. The
Procurement Team work hard to raise awareness of this approach, working
closely with the Supplier Development Programme to promote the initiative
amongst SMEs. 
We have demonstrated our Wish List approach at various Procurement and
Economic Development forums, including as part of a Community
Engagement Workshop at the Annual National Procurement Conference.
The workshop was attended by more than 100 delegates, and there is now
UK-wide interest in our approach. Our Community Benefits approach has
been included in a Scottish Government publication, measuring social impact
in public procurement: SPPN 10/2020 and was part of a case study created
by SCRIG (Scotland’s Centre for Regional Inclusive Growth). 
Case Study: Child Abuse in Care Redress Scheme
The Redress for Survivors (Historical Child Abuse in Care) (Scotland) Act
2021 led to the establishment of a financial redress scheme. Claiming
redress requires people to provide evidence of their care experience; one of
the ways this can be obtained is by people exercising their right to make a
subject access request for the information about them which is held by the
authority. It was recognised that many requestors were also seeking
information about their life experiences, to make sense of what were often
difficult and traumatic experiences.
This led to a significant increase during 2021/22 (19% more than during
2020/21) in the number of people exercising their right to access information
about themselves (or about deceased partners or parents) held by Perth and
Kinross Council. These requests were frequently for large volumes of
sensitive and distressing information, which require processing to remove

Page 21

Appendix 1 
CDS BMIP 2022-23  Page 21 
third party and other information, before they can legally be released. The
volume of work which the Information Governance team was dealing with led
to delays in responding to people at what was often a time of heightened
emotion.
Working with Education and Children’s Services, additional funding was
secured to employ two officers to deal primarily with requests for historical
care records. This additional resource has resulted in an improvement in the
time taken to respond to requestors, with almost all requests relating to care
experience being responded to, either in full or partially, within statutory
timescales. Ongoing training will enable staff to access information held on
social work systems which will streamline and speed up the service provided
to requestors. They will also use the Archives held by CulturePK to look for
evidence when no records are held on social work systems.
Recognising the distressing content of many records, the Information
Governance team has developed communications which direct individuals to
contact external support organisations. When no information is held,
members of the team provide guidance on where requestors could try to find
evidence. All requestors are treated compassionately and with empathy, and
there is a recognition of the particularly difficult circumstances of people who
are seeking evidence for the Redress Scheme.
CDS Priorities for 2022/23
Whilst interrupted by the 2-year pandemic, it is planned that development
work will restart in 2022/23 to develop an ambitious Customer Service
Strategy. This will include a new model of service, customer insight and
engagement and developing customer engagement based on the national
Customer Service Excellence model. 
We will continue to promote digital channels and make sure no citizen is
excluded. We are investigating opportunities for new and emerging
technologies including webchat to improve service operation and design.
This will be aided by robust demand analysis

Page 22

Appendix 1 
CDS BMIP 2022-23  Page 22 
Working Smarter 
This matters because a strategic and integrated approach to people, technology
and property is essential to improving how we work as a Council to support
delivery of the Perth and Kinross Offer. Our experience in responding to the Covid
19 pandemic has demonstrated that as an organisation we can implement   radical
change at pace and scale. We will therefore continue to challenge our traditional
assumptions about work and workplace, embrace different ways of working which
improve productivity, enhance the employee and customer experience, and
achieve better outcomes for our communities.
Performance Summary for 2021/22
Working Smarter has meant being more flexible about what we do, how we work,
who we work with, when and where employees work – ensuring we optimise use of
buildings, workspace, and technology to find new and more effective ways of doing
things. It is also about supporting wellbeing, enhancing employee experience, and
promoting positive life work balance. Over the last year, we have seen a stop start
impact in terms of remobilising our offices, in line with public health requirements as
prevalence of Covid-19 changed across the country. A gradual return to corporate
offices was facilitated in line with emerging public health guidance from early 2022.
This return was assisted with new HR guidance on hybrid working and the
installation of IT equipment to facilitate hybrid meetings in additional offices. The
return has also seen a reduction in paper files facilitated by new ways of working and
the new EDMS.
Office based staff are now settling into new hybrid working patterns and Covid public
health restrictions have been eased. Maintaining a healthy and safe work
environment for all remains a priority and everyone has a responsibility for looking
after themselves and respecting each other. A range of good practice mitigations
and support remain in place to safeguard the health and wellbeing of staff, elected
members, and members of the public. These include promotion of the Distance
Aware Scheme.
Priorities for 2022/23
Over the next few months, we will be working with teams in offices to review
workspace requirements based on how they are using hybrid working; this will help
determine overall space requirements and consider the need for quiet spaces,
collaboration spaces, bookable rooms with and without hybrid meeting equipment.

Page 23

Appendix 1 
CDS BMIP 2022-23  Page 23 
This exercise will ensure we are making best use of our office accommodation and
digital kit, supporting staff to work flexibly and to aid productivity. 
ORGANISED TO DELIVER   
Governance and Management Structure of the Service
CDS has the key resource functions relating to people, money,
property, and information. This brings together the key strategic
enablers of change and transformation. It also is the central service
which supports the Council’s democratic processes and civic role
and manages the governance framework.
CDS provides specialist customer services directly to the communities of
Perth and Kinross through its Registrars, Licensing, Information Governance,
Local Taxes   & Benefits and Welfare Fund & Welfare Rights teams. It also
provides the Council’s general enquiry service for residents, businesses, and
visitors through the Customer Contact Centre. 
CDS employs 522 people working a full time equivalent of 464 permanent
employees across a diverse range of functions and activities. 
CDS fulfils a significant role in the Council’s leadership and governance
structure. With representation on the Executive Leadership Team, CDS
provides the core expertise in corporate resources, digital / IT, legal and
financial advice to the Chief Executive, Executive Directors, Elected Members
and Conveners of Committees of the Council. 
Key statutory roles are held by officers within CDS; Monitoring Officer
(Head of Legal & Governance Services), Section 95 Officer (Head of
Finance) and the Data Protection Officer. The Head of IT & Revenues
is the Chief Digital Officer. 
Heads of Service and Senior Service Managers are members of the
Extended Executive Leadership Team (EELT). Many also have leadership
roles on several key groups and Boards within and out with the organisation
and contribute to the national policy and strategic agenda via Cosla or their
respective professional associations.

Page 24

Appendix 1
CDS BMIP 2022-23 Page 24
This ‘At a Glance’ Diagram of Corporate Services shows the different
Divisions and teams within the Service and a brief outline of their
responsibilities. More detail can be obtained on our ERIC page Here
Customer Focus and Community Engagement
Customer Experience is normally associated with external customer contact
and service teams who deal directly with the public. However, our internal
customers are just as vital (the next person in the process is your customer).
Employee experience is at the heart of HR service delivery.
Customer engagement and improved communication with customers across
all the    Service’s work will be progressed to ensure CDS is listening carefully to
its customers’ needs, and to develop exceptional levels of insight into how it
could transform and improve to the benefit of customers.
We also directly provide customer services to the public in line with the
Customer Service Excellence Standards (Formerly Charter Mark). The
Welfare Rights Team already hold accreditation at the highest level possible
for Welfare Benefits Advice and Representation at Courts and Tribunals.
Working proactively with Scottish Government and partners, Welfare Rights
staff share best practice and influence guidance and process to ensure
policy objectives are optimised.
LEGAL AND
GOVERNANCE
FINANCE PROPERTY HUMAN
RESOURCES
IT And
REVENUES
Legal Services Digital Services
Central Accounting Corporate Landlord HR Resourcing &
Wellbeing Civic and
Committee Services Customer Contact
Centre
Members Services Financial Planning &
Budgeting
Capital Works,
Quantity Surveying
& Project
HR Services Local Taxes
& Benefits Information
Governance
Data Analytics
Registrars Procurement Premises
Management
HR Performance &
Systems
IT Operations
Licensing Insurance, Incomes
& Financial Systems Compliance
Payroll and Reward 
Internal Audit Welfare Fund
&Welfare Rights

Page 25

Appendix 1 
CDS BMIP 2022-23  Page 25 
Preparing our People for the Future
People are the Council’s most important asset and remain at the heart of everything
it does. The people who work in CDS are dedicated and committed to public service
and use their talents and skills to provide the best possible services to our customers
and communities. We remain committed to investing in the support and development
of our employees – providing 1:1 time, team discussions, wellbeing support and
access to learning and development – leadership training, continuing professional
development, digital skills, and certificated qualifications.
The Council’s Corporate Workforce Plan (2021 – 2023) (Report No. 21/84
refers), together with the Organisational Development Plan and Health &
Wellbeing Plan, collectively set the direction for how we develop our
workforce for the future. These plans will evolve to support and enable the
Transformation and Change Programme, with engagement and consultation
with employees and trade unions throughout.
The Service continues to have a strong track record of employing modern
apprentices and professional trainees, as well as offering graduate work
experience opportunities across all our teams. This approach ensures a
pipeline of talent for future roles. CDS currently provides twelve opportunities
for trainees, working across Energy and Engineering, Data analytics, Payroll,
Internal Audit and Legal services, with a further three opportunities in Cyber
Security and HR.
The pandemic has changed the way we live and work; in CDS many teams
have continued in their normal workplace with changes in work practices –
for example, Registrars, IT, and property teams. Many staff were working
from home and are now settling into new hybrid work patterns, where this is
appropriate for the customers they serve. Keeping people safe and
promoting wellbeing remain priorities for the Council as an employer of a
large and diverse workforce and we continue to work collaboratively with
trade unions on health and safety and employment matters. 
We are ambitious for how we enhance the collective contribution of CDS in
service delivery to our customers and communities and in how we support
and enable the Council to achieve its priority outcomes. With increasing
demands and reducing resources, how we work is as important as what we
do. We will continue to develop: 
• Strong relationships that enable CDS to act as professional adviser
and as a critical friend. Influential and solution focussed people that
are connected, astute and politically aware, providing relevant and
timely advice that leads to more informed decision making and better
outcomes.

Page 26

Appendix 1 
CDS BMIP 2022-23  Page 26 
• Confident and visible leaders who understand public services, role  
model technical excellence and lead by example. 
• Skilled people equipped with the knowledge, skills, and experience
to achieve our priorities and meet future challenges. 
• Clear career frameworks and succession planning arrangements
that define roles and set expectations of our people, to support the
attraction and retention of high-performing and diverse talent. 
• Team structures and ways of working that promote collaboration,
integration, and knowledge-sharing. 
• Clear, consistent, and accessible data governance, helping to protect
data integrity, and improve evidence-based decision making. 
• Effective risk management that is integrated and embedded into our
core business processes and a review of the Council’s risk appetite. 
• Enhanced reporting and monitoring of strategic financial performance
and associated risks, that informs governance, decision making and
financial management for the Council. 
Partnership Working
Our values drive our behaviours and actions in all that we do. These are
Ambition, Compassion, and Integrity. Our staff are also expected to
demonstrate strong ethical behaviour, respecting the rule of law and the
appropriate codes of conduct. 
Our Service includes several professional disciplines, each subject to its own
governing body and professional standards. We provide support for
continuing professional development and learning for all to maintain and
develop skills and knowledge to enable us to continue to provide the best
possible advice and support. 
Our approach to working with our customers and stakeholders is to be collaborative,
supportive, enabling, and agile. Our approach is to work collaboratively with Services
and Partners to deliver the best possible outcomes  for our citizens and communities.
Several key community-wide developments and service activities will be supported
by officers in CDS. Some examples include:

Page 27

Appendix 1 
CDS BMIP 2022-23  Page 27 
• Major construction projects such as Cross Tay Road Link
Road, City Hall Museum, and enhancements to the school
estate.
• Comrie Flood Protection Scheme
• Child Poverty
• Support for asylum seekers and Ukraine refugees
• Health & Social Care – Review of the Integration Scheme
• The Perth and Kinross Offer
• Local Action Partnerships
• Work with Third Sector to ensure seamless referrals to welfare rights
• Community Vaccination Centres and Food Support
• Wellbeing Economy Alliance - UNCRC (United Nations Convention on
the Rights of the Child) focussed pilot project in Letham
• 2022 Transformation and Change Programme. 
We want every member of CDS to fulfil their respective professional roles to
the best of their ability and take ownership in leading, piloting innovative
ideas, learning from others, and improving outcomes for communities and
citizens. 
Collaboration with other functions is essential in the delivery of this plan. We
will continue to promote a One-Council approach, share knowledge and
information, solve problems together, and develop creative solutions jointly to
drive better quality outcomes for our communities. 
Financial and Resource Management
CDS itself has a net revenue budget of £36.4m in 2022/23 which represents
8.8% of the Council’s Revenue Budget. CDS has direct responsibility for a
capital budget of £57m through to 2028/29, split between IT and Property
Services. 
Property Services makes up £17.5m, 48% of the CDS Net Revenue Budget. Our
considerable property estate needs to be maintained to high standards to
address conditions issues as well as challenges relating to climate change, Net
Zero and emerging technology and legislation. In the next period, it is
anticipated that demand for maintenance will continue to exceed previous levels
of activity. Currently, the construction market is highly volatile and unpredictable
in the short to medium term, and this is problematic for investment planning
because of cost uncertainty and concern over the supply of labour and
materials.

Page 28

Appendix 1 
CDS BMIP 2022-23  Page 28 
IT investment ensures our core infrastructure components (servers, cyber
security, user devices, Microsoft estate and business systems and telephony
etc) provide a stable platform from which to build digital and transformative
change. It ensures the technologies needed to deliver frontline services remain
up to date, secure, available, and developed to meet evolving customer needs
and the Council’s emerging operating model.  The last two years have also seen
seismic disruption to IT supply chains with lead times for some equipment
increasing from 3 weeks to 13 months. This volatility and unpredictability are
likely to continue into 2023.  
Budget monitoring for the overall Council revenue budget of £430million and
capital budget of £640m through to 2028/29 is reported to the new Finance and
Resources Committee. 
The Investment Blueprint and Delivery Plan will ensure investment decisions
support corporate objectives and priority outcomes - investment in
maintaining and developing the assets which are used to deliver services
(including schools, houses, operational buildings, and infrastructure) and the
utilisation of capital funding to stimulate economic development and
regeneration in local areas are essential enabling activities. Delivery of the
Council’s ambitious capital programme supports key outcomes such as
tackling climate change, cultural transformation, and improving the school
estate. 
A graphical representation of CDS’ Net Revenue Budget and FTE is shown
below.

Page 29

Appendix 1
CDS BMIP 2022-23 Page 29
Performance, Self-Evaluation, and Risk Management
The Service makes a significant contribution to the overall strategic objectives
directly through our service delivery, and through our professional advice and
support to other Services and Partners in all that they do.
CDS participates in the cross-service Planning, Performance and Risk (PPR)
group as part of the corporate policy and governance arrangements. CDS is
committed to embedding self-evaluation and performance management
across all teams to drive improvement and more integrated ways of working. 
CDS welcomes the new modernised performance reporting system procured
in Spring 2022 by the PPR group lead officer. This will help us to embed
effective performance management principles and disciplines throughout the
Service. Our 2021-22 performance against key corporate indicators will
shortly be available on our web site at, PK Performs selecting ‘Organised to
Deliver’. Previous year’s performance indicators are available online now.

Page 30

Appendix 1 
CDS BMIP 2022-23  Page 30 
As part of the business planning process for 2022/23, CDS undertook a
PESTLE and SWOT analysis to gain insight into the emerging demands and
risks which may affect our performance and the organisation’s capacity to
deliver services. This insight helped shape our improvement priorities. 
We are aware of Audit Scotland’s recommendations (Best Value Assurance
Report August 2019) around improving how performance management and
performance reporting is used to drive continuous improvement, and we are
investing resources to change the way we use data and information. Work
has commenced on developing a balanced scorecard within our performance
management arrangements. 
Effective risk management is a key element of the Council’s system of
internal control and an essential element of good governance. CDS has
responsibility for the development and management of the Council’s Strategic
Risk Management Framework; ensuring that there is a consistent and
coherent approach taken across the organisation to the identification,
assessment, analysis, mitigation, and management of strategic and key
operational. An update to the Strategic Risk Register will be presented to the
appropriate Council Committee in summer 2022. 
As the core corporate functions, CDS are the risk owners in relation to
several of the key risks facing the Council including financial management
and accountability, information security, workforce, and corporate
governance. 
As key enablers of change and transformation, CDS also play a key role
in supporting the organisation in managing and mitigating the spectrum of
strategic risks from reducing the impact of climate change to tackling
poverty and inequality across Perth and Kinross. Involving and engaging
staff in the critical agendas of equality and fairness, sustainability and
climate change will ensure everyone can contribute effectively. 
Financial
Resilience
Corporate
Governance
Workforce
Information
Security

Page 31

Appendix 1 
CDS BMIP 2022-23  Page 31 
As part of our business planning activity during 2021-22, CDS regularly reviewed
the opportunities and threats emerging from the external environment and
updated its Service Risk Register. 
KEY PERFORMANCE INDICATORS 
The section below provides 2021/22 performance indicators where the information is
currently available. The remaining indicator will be updated later this year when the
information becomes available. 
Comments on Performance Indicators
Council performance in the Corporate Services’ indicators has mirrored the national
experience during the COVID-19 pandemic. The 2021/22 performance in respect of
these indicators shows that as the restrictions have eased, performance levels are
returning to normal ranges.

Page 32

Appendix 1 
CDS BMIP 2022-23  Page 32 
Sickness absence has increased from an average of 8.3 to 10.9 days for non-
teaching employees. This excludes Covid-related absences. The requirement for
most staff to work from home changed the way we work and meant resources,
systems, processes, tools, and technology being deployed very differently. Working
digitally and from home and recording COVID-19 absences differently saw
reductions in sickness absences, in line with other organisations in 2020/21. Our
sickness absence indicators continue to be impacted and these are being closely
monitored. We have identified some factors that we consider have contributed to
increases in absences and these are used to shape our wellbeing support for
employees, including advice and support for managers. We will continue to work with
our trade unions and professional associations to prioritise support for the health and
wellbeing of our workforce who are essential to delivering the best possible services
to the people of Perth and Kinross.

Page 33

Appendix 1 
CDS BMIP 2022-23  Page 33 
Contact Us
For further information on any aspects of our Business Management and
Improvement Plan, please contact any of the following officers:

Page 34

Appendix 1
CDS BMIP 2022-23 Page 34
Links to relevant documents
Community Plan and LOIP 2017-2027
Corporate Plan 2018-2022
Corporate Workforce Plan 2021-2023
Revenue budget and Reserves Strategy Report Feb 2022
Local Government Benchmarking Framework Report 2020-21
All Annual accounts
Council budgets
Past Council Strategies, Performance Reports and Business Plans
Best Value Assurance Report 2019