Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee: Finance and Resources Committee
Date of Meeting: 4 February 2026
Report Title: 2025/26 Revenue Budget – Update No. 3
Report Number: 26/36
Report Author: Scott Walker, Chief Finance Officer
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________
1. Purpose
1.1 The purpose of this report is to provide an update on progress with the
2025/26 General Fund Revenue Budget based upon the November 2025
ledger, updated for any subsequent known material movements, and the
projected financial position of the Housing Revenue Account.
1.2 The total net projected underspend on the 2025/26 General Fund
Management Budget, is £2.234 million (or 0.4% of the 2025/26 Revised
Management Budget) which represents a positive movement of £2.573 million
(see Appendix 1).
1.3 Sections
1. Purpose
2. Recommendations
3. Background
4. 2025/26 Revenue Monitoring
Service Budgets
Corporate Budgets
Funding
Other Updates
5. 2025/26 Revenue Budget Adjustments
Additional Funding
Virements
Movements In Reserves
6. Financial Risks
7. Conclusion
8. Impact and Value Assessment
9. Appendices

Page 2

2. Recommendations
It is recommended that the Committee:
2.1 Note the contents of the report,
2.2 Note the projected outturn for the General Fund set out in Section 4 and
Appendix 1 and 2,
2.3 Approve the adjustments to 2025/26 General Fund budgets set out in Section
5 and Appendices 1,2,4,5,6 and 7,
2.4 Note the financial risks set out in Section 6 and Appendix 8.
3. Background
3.1 This report updates the Committee on progress with the 2025/26 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the November 2025 ledger,
updated for any subsequent known material movements.
3.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2025/26 Revenue Budget on 26
February 2025 (Report No. 25/36 refers).  In addition, adjustments approved
by the Finance and Resources Committee on 30 April, 25 June, 1 October
and 26 November 2025 (Report No’s 25/99, 25/172, 25/248 and 25/326 refer)
are reflected in Appendix 1 (Column 2).  In addition, approval to apply
additional resources to Perth and Kinross Health and Social Care Partnership
on 29 October 2025 is also reflected ( Report No 25/278 refers).
4. 2025/26 Revenue Monitoring
Service Budgets
4.1 The total net projected underspend on Service budgets, which is
summarised in Section 1 of Appendix 1 to this report, is £2.260 million
which represents 0.6% of total net Service expenditure.
4.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below.
4.3 The management of Service over and underspends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years.
4.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets.

Page 3

Education and Learning
4.5 There is currently a projected underspend for Education and Learning
excluding Devolved School Management (DSM) and the Pupil Equity Fund
(PEF) of £835,000 or 0.5% of the budget which represents a positive
movement of £784,000.  The individual elements contributing to this position
are summarised in the following table with commentary on the significant
variances below.
Projected Outturn MovementFunction
£’000 % £’000
Education and Learning Core Overspend 8 0.5 2
Nursery Sector Underspend (588) (2.0) (227)
Primary Sector Overspend 908 1.7 (206)
Secondary Sector Underspend (567) (9.1) (78)
Special Sector Underspend (316) (1.8) (275)
Home to School Transport Underspend (280) (2.5) -
TOTAL Underspend (835) (0.5) (784)
4.6 In the Nursery Sector, there is an increase in the projected underspend of
£227,000 due to updated staff cost projections, including deferred places and
lower partner provider payments.
4.7 In the Primary Sector, there is a reduction in the projected overspend of
£206,000 due to updated staff cost projections.  This is a result of a reduction
in the projected costs associated with sickness absence.
4.8 Within the Secondary Sector, there is an increase in the projected
underspend of £78,000 due to updated staff cost projections.
4.9 In the Special Sector there is an increase in the projected net underspend
of £275,000 due to updated staff cost projections, partially offset by increases
in the cost of independent school placements.
4.10 In the Devolved School Management Scheme there is a projected
underspend of £100,000.  However, some schools are experiencing
challenges in delivering approved staff slippage targets and facing inflationary
pressures against budgets that have been reduced over previous years.  The
budgets for the Devolved School Management scheme are allocated by
financial year (April – March), whereas expenditure is incurred by academic
year (August – June).
4.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than budget.  It is anticipated
this this expenditure will be incurred prior to the conclusion of the 2025/26
academic year.

Page 4

Children, Families and Justice
4.12 There is currently a projected underspend for Children, Families and Justice
of £155,000 or 0.6% of the budget, which represents an adverse movement
of £115,000.  The individual elements contributing to this position are
summarised in the following table with narrative on the significant variances
below.
Projected Outturn MovementFunction
£’000 % £’000
Children & Families Underspend (155) (0.7) 115
Justice Service On Target - - -
TOTAL Underspend (155) (0.6) 115
4.13 In Children and Families, there is a reduction in the projected underspend
of £115,000.  This is due to an increase in the number and costs of residential
placements, partially offset by projected savings on staff costs and foster,
kinship and adoption services linked to new working practices.
Economy, Development and Planning
4.14 There is currently a projected underspend for Economy, Development and
Planning of £260,000 or 1.6% of the approved budget which represents a
positive movement of £207,000.  The individual elements contributing to this
position are summarised in the following table with narrative on the significant
variances below.
Projected Outturn MovementFunction
£’000 % £’000
Service Wide Underspend (73) (1.2) (120)
Tourism, Culture and Place Overspend 113 2.4 13
Development Management and
Building Standards
Underspend (300) - (100)
TOTAL Underspend (260) (1.6) (207)
4.15 Service Wide there is an increase in the projected underspend of £120,000
based on the latest staff cost projections.
4.16 4In Development Management and Building Standards, there is an
increase in the projected underspend of £100,000 due to additional income
from planning applications.
Environment and Infrastructure
4.17 There is currently a projected overspend for Environment and Infrastructure
of £275,000 or 0.8%, which represents a positive movement of £250,000. 
The individual elements contributing to this position are summarised in the
following table with narrative on the significant variances below.
Projected Outturn MovementFunction

Page 5

£’000 % £’000
Service Wide Overspend 100 0.8 (400)
Traffic and Network Underspend (150) (12.0) (50)
Waste Disposal Underspend (150) (1.7) 100
Refuse Collection Overspend 175 3.4 -
Fleet Overspend 200 - -
Roads Maintenance
Partnership
Overspend 100 4.1 100
TOTAL Overspend 275 0.8 (250)
4.18 Service wide there is a reduction in the projected overspend of £400,000
due to updated staff cost projections.
4.19 In Traffic and Network there is an increase in the projected underspend of
£50,000 due to additional income from statutory road network charges.
4.20 In Waste Disposal, there is an increase in the projected overspend of
£100,000 due to increases in both the volume of waste and gate fees.
4.21 Across the Roads Maintenance Partnership there is a net increase in the
projected overspend of £100,000.  This is derived from a projected
overspend on routine and cyclic works and flood maintenance partially offset
by savings on street lighting.
4.22 Since the start of 2026 there has been significant activity reacting to severe
weather events including snow, ice and rain.  Currently, there is no reported
variance.  However, there is a risk that if there are further weather events that
this will result in an overspend which will impact on the level of unearmarked
Reserves.
Housing and Communities
4.23 The projected outturn for Housing and Communities is currently anticipated
to be £250,000 or 1.3% more than budget, a positive movement of £7,000. 
The individual elements contributing to this movement are summarised in the
following table with commentary on the significant variances below.
Projected Outturn MovementFunction
£’000 % £’000
Service Wide Underspend (7) - (7)
Bereavement Services Overspend 14 1.7 -
Public Transport Unit Overspend 75 (0.5) -
Parking and Civil
Contingencies
Overspend 94 - -
Specialist Services Overspend 74 1.2 -
TOTAL Overspend 250 1.3 (7)

Page 6

Property Services
4.24 The projected outturn for Property Services is currently anticipated to be
£212,000 or 0.3% less than budget which represents a positive movement of
£366,000.  The individual elements contributing to this movement are
summarised in the following table with commentary on the significant
variances below.
Projected Outturn MovementFunction
£’000 % £’000
Service Wide Overspend 593 1.5 (69)
Energy Underspend (996) (12.8) (216)
Facilities Management Overspend 446 5.63 28
Catering Underspend (255) (3.1) (109)
TOTAL Underspend (212) (0.3) (366)
4.25 On a Service Wide basis, there is a reduction in the projected overspend of
£69,000 due to updated staff cost projections.
4.26 On Energy, there is an increase in the projected underspend of £216,000
based on the latest consumption information.
4.27 In Catering there is an increase in the projected underspend of £109,000
based on the latest data on school meal uptake.
Legal and Governance
4.28 Within Legal and Governance there is a projected underspend of £126,000
or 3.1%, which represents a positive movement of £18,000.
Customer and Digital Services
4.29 The projected outturn for Customer and Digital Services is currently
anticipated to be £581,000 or 4.3% less than budget, which represents a
favourable movement of £568,000.  The individual elements contributing to
this movement are summarised in the following table with commentary on the
significant variances below.
Projected Outturn MovementFunction
£’000 % £’000
IT and Customer Services Underspend (661) (7.2) (574)
Revenues and Benefits Overspend 80 1.35 6
TOTAL Underspend (581) (4.3) (568)
4.30 In IT and Customer Services there is an increase in the projected
underspend of £574,000 due to updated staff cost projections which have
been impacted by delays in recruitment.

Page 7

Strategic Planning, People and Performance
4.31 The projected outturn for Strategic Planning and Performance is £476,000
or 7.8% less than budget which represents a favourable movement of
£350,000. The majority of this projected underspend relates to the Community
Mental Health and Fairer Futures Locality funds which have not been utilised
to date and additional income from the salary sacrifice scheme.
Finance and Business Support
4.32 The projected outturn for Finance and Business Support is currently
anticipated to be £140,000 or 1.3% less than budget which represents a
favourable movement of £115,000 due to updated staff cost projections.
Scott Street Fire
4.33 At this time, there are no costs included within the Service monitoring
information in relation to the fire that took place at Scott Street, Perth in June
2025.
4.34 To date the Council has incurred costs of around £1.3 million, with the latest
projection reducing to £2.6 million.
4.35 Work continues with insurance companies to recover costs, and the Council
has appointed its own loss adjuster to represent it in the complex discussions.
4.36 Furthermore, the Council has received a contribution of £1 million from the
Scottish Government towards the cost of responding to the incident.
4.37 Further updates will be provided to future meetings of the Finance and
Resources Committee.
Corporate Budgets
4.38 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings is set out below.
Health and Social care
4.39 On 17 December 2025, Perth and Kinross Integration Joint Board considered
a report on the 2025/26 Financial Position, based on financial information to
month seven (October 2025) (Report No. G/25/198 refers).
4.40 The financial recovery plan identified measures that could be delivered in the
current financial year (part A) which are reflected in the projected outturn
below, as well as other measures (part B) which will require further
consideration and may be deliverable over the longer term, and this was
included in an update to Council on 14 January 2026 (Report No. 26/13
refers).

Page 8

4.41 The latest financial update included an updated projected net overspend
across the Health and Social Care Partnership of £4.414 million which is
summarised in the following table and in detail in Appendix 3.  This position
remains consistent with the financial challenges facing health and social care
across Scotland.
Social
Care
£m
Health
£m
Health and Social
Care Partnership
£m
Gross Projected Overspend 4.581 0.947 5.528
Application of Remaining
General Reserves
(0.164) - (0.164)
Financial Recovery Actions
- (Part A)
(0.250) (0.700) (0.950)
Net Projected Overspend 4.167 0.247 4.414
4.42 On 29 October 2025, the Council agreed to provide up to £4.180 million of
additional financial support in 2025/26 (Report No. 25/278 refers).  This
funding will meet the costs associated with high service demand and provide
time to complete the work outlined in part A and B of the Financial Recovery
Plan.
4.43 The Finance and Resources Committee will receive further updates as
information becomes available.
Funding
4.44 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below.
Council Tax Income
4.45 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll.
4.46 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 December 2025
together with prior year comparative figures for the previous five financial
years.

Page 9

4.47 Between 2020/21 and 2024/25, the average collection figure to 31 December
was 81.41%.  The actual collection figure to 31 December 2025 was 81.14%
which is 0.27% less than the five-year average and 0.03% more than the
comparable position in 2024.
4.48 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions.

Page 10

4.49 Currently, the level of Council Tax income is projected to be on target against
the budget assumptions which is reflected in Appendix 1.
Non-Domestic Rates
4.50 The actual collection rate to 31 December 2025 was 83.13%, compared to
81.38% for the same period in 2024/25.
Other Updates
Housing Revenue Account
4.51 In terms of recurring activity across the Housing Revenue Account, there is
a projected underspend of £200,000 for the current financial year.  All things
being equal, this will result in an increase in the level of unearmarked HRA
reserves and ensure that the level of unearmarked reserves is maintained at
between 2 and 4%.  The main elements of the movements are summarised
below and set out in Appendix 4.
4.52 The significant factors contributing to the increase in the level of
unearmarked HRA Reserves of £200,000 are as follows.  Additional staff
slippage across the HRA (£101,000), a reduction in the projected overspends
in Repairs and Trades (£158,000) and additional income (£134,000).  These
projected underspends are partially offset by projected overspends on Internet
of Things sensors (£70,000), recharges (£50,000) and an increase in the level
of capital funded from revenue (£73,000).

Page 11

4.53 There is also a reduction in the funding required from earmarked HRA
Reserves of £139,000.  This is made up of slippage in housing repairs
(£70,000), housing improvements and localities.
4.54 The net result of this latest monitoring on Housing Revenue Account Balances
is as follows –
 HRA unearmarked Reserves - £1.2 million
 HRA earmarked Reserves - £968,000
5. 2025/26 Revenue Budget Adjustments
Additional Funding
5.1 Since elected members were provided with the 2025/26 Revenue Budget
update on 26 November 2025 (Report No. 25/326 refers), notification has
been received of additional resources in the current financial year from
several sources as set out below.  To ensure that the 2025/26 Management
Budget continues to reflect the operational requirements of the Council,
several adjustments are required, which are summarised below and included
either in Appendix 1 or Appendix 5.
Scottish Government – Revenue Support Grant:
 Teacher Induction Scheme - £64,000 (Education and Learning)
 Discretionary Housing Payment – Tranche 2 (for bedroom tax mitigation
and benefit cap mitigation) and Housing Emergency Action Plan - £24,000
(Customer and Digital Services)
 Scottish Welfare Fund - £101,000 (Customer and Digital)
 Invest to Save - £529,000 (Directorate Core Costs)
 Rapid Rehousing Transition Plan - £20,000 (Housing and Communities)
 Single Use Vapes - £5,000 (Housing and Communities)
 Nature Restoration Fund £94,000 (Environment and Infrastructure)
 Prisoner Early Release £34,000 (Housing and Communities)
 Pay Deal Single Status £481,000 (Reserves)
5.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £1,352,000 will be made through a redetermination
of the Council’s funding.  It is therefore necessary to adjust budgets for
Education & Learning, Customer & Digital Services, Directorate Core Costs,
Housing & Communities, Environment & Infrastructure and Revenue Support
Grant.
Other Funding
5.3 Other funding amounting to £1.687million has been paid outside the
Revenue Support Grant mechanism as Other Grant income and is, therefore,
cost neutral in terms of the budget summary.  Details of this funding is set out
in Appendix 5.

Page 12

5.4 ACTION: The Committee is asked to note the receipt of £1.687 million of
additional resources, with this funding being reflected within Housing and
Communities, Economy, Development and Planning, Strategic Planning,
People and Performance, Education and Learning, Children, Families and
Justice and Customer and Digital Services as additional grant income.  The
current projected outturn assumes that all these additional resources will be
fully expended in 2025/26 or will be carried forward under the terms of the
grant award.
5.5 In addition, the receipt of £1 million from the Scottish Government towards
the cost of responding to the Scott Street fire is now reflected in Appendix 1
with an increase in the budgets for Capital Grant and Property.
Virements
Contribution to/from Capital Fund
5.6 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or underspend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.
5.7 The latest monitoring indicates a projected reduction in capital financing costs
(loan charges) of £1.416 million based on the latest treasury management
activity and an increase of £487,000 in income from interest on revenue
balances due to updated cashflow projections.  This will result in an increased
Contribution to the Capital Fund of £1.903 million in the current financial
year.  This is consistent with the planned use of the Capital Fund to manage
the revenue cost of supporting the Capital budget over the short term.
5.8 ACTION: The Committee is requested to approve the virement of £1.416
million to the Capital Financing Costs (Loan Charges) Budget and £487,000
to Interest on Revenue Balances with a corresponding increase in the
projected Contribution to the Capital Fund.  These adjustments have been
reflected in Appendix 1 (Column 4) to this report.
Service Virements
5.9 To ensure that the 2025/26 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 4) that have been
processed in line with the Scheme of Administration.
Movements In Reserves
5.10 Included at Appendix 6 is an update on the Council’s General Fund Reserves
which includes the following:
 Earmarked and unearmarked Reserves at 31 March 2025 (per audited
Annual Accounts).

Page 13

 previously approved contributions to and from earmarked Reserves in
2025/26, 2026/27 and 2027/28.
 The impact of proposals within this report on earmarked Reserves.
 The impact of the latest revenue monitoring on the level of
unearmarked Reserves.
5.11 The earmarked Reserves are presented under three headings as follows:
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation, and the Council has limited discretion in
how they are applied.
ii. Balances held for specific (previously approved) purposes – the purpose
of these earmarked Reserves has been previously approved by Council
in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals.
5.12 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration.
Balances Held Under Statute / Regulation
5.13 The following are adjustments to the earmarked Reserves held under statute
or regulation.
 £740,000 from Revenue Grants to Housing and Communities to
support eligible expenditure including costs associated with Ukraine
resettlement costs and the Rapid Rehousing Transition Plan.
Balances Held for Specific (Previously Approved) Purposes
5.14 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts.
5.15 Specifically, authority is sought to adjust the following earmarked Reserves
identified below:
 £58,000 from the School Estate earmarked Reserve to support IT costs at
Bertha Park (Education and Learning)
 £49,000 from Climate Change to take forward approved projects
(Environment and Infrastructure)
 £70,000 returned to works maintenance due to a rephasing of the
expenditure (to be drawn down in 2026/27) (Housing and Communities)
 £24,000 returned to Community Investment Fund (to be now drawn down
in 2026/27) (Housing and Communities)
 £6,000 from the Local Area Partnerships reserve for scheme applications
(Housing and Communities)

Page 14

 £35,000 from the Feasibility reserve towards the cost of taking forward the
strategic energy partnership (and a further £65,000 in 2026/27) (Economy
Development and Planning)
 £400,000 returned to the Extended Producer Packaging reserve due to
slippage on waste projects (to now be drawn down in 2026/27)
(Environment and Infrastructure)
 £694,000 to Council Approved Revenue Budget Flexibility to reflect the
timing of expenditure towards approved projects.
5.16 ACTION: The Committee is asked to approve the transfers to or from
earmarked Reserves set out in paragraph 5.15 above.  These adjustments
are reflected in Appendix 1 (Column 5) to the report.
Balances Held for Other Purposes
5.17 Approval is sought for an adjustment relating to the earmarked Reserve for
Transformation and Workforce Management of £110,000 for workforce
management in order to deliver recurring savings to the Revenue Budget.
5.18 Approval is also sought to adjust the budgets for Projects and Programmes
(£181,000) and Strategic Planning People and Performance (£150,000) to
reflect a rephasing of transformation and change activity.
5.19 ACTION: The Committee is asked to approve the transfer of £110,000 from
the Transformation and Workforce Management earmarked Reserve to
Property Services for workforce management and £331,000 from Projects and
Programmes and Strategic Planning, People and Performance.  These
adjustments are reflected in Appendix 1 (Column 5) to the report.
5.20 The Health and Social Care Partnership has completed the trialling and
evaluation of a digital enabled transcription tool, designed to streamline
notetaking and documentation. The evaluation has evidenced significant
efficiencies, an increase in productivity, quality of data and staff well-being. 
Approval is now sought to scale up this project for a further year with a
contribution from the Transformation and Workforce Management earmarked
Reserve of £88,000.
5.21 This proposal would be subject to agreed governance requirements where a
limited extension to the pilot would be agreed for a 12 month period.  During
this time the Service will work with IT and governance colleagues to produce
an options appraisal for a range of transcription solutions to identify a cost
effective long term solution.
5.22 ACTION: The Committee is asked to approve the transfer of £88,000 from the
Health and Social Care earmarked Reserve to the Health and Social Care
Partnership.  This adjustment is reflected in Appendix 1 (Column 5) to the
report.
5.23 Approval is sought to draw down funding of £60,000 from the Anti-Poverty
earmarked Reserve to support the Council’s Summer Work Placements
Programme.  For Summer 2026, the proposal is to introduce four-week paid

Page 15

placements for school leavers with roles aligned to workforce needs and
apprenticeship routes, strengthening the Council’s ability to attract and
develop new talent in a sustainable way.  Each placements costs
approximately £2,000 for a 4-week placement (paid at the real living wage)
and it is proposed to offer 30 placements in 2026.  Approval is required at this
stage to commence the recruitment to the programme.
5.24 ACTION: The Committee is asked to approve the transfer of £60,000 from the
Anti-Poverty earmarked Reserve to the Strategic Planning, People and
Performance in 2026/27.
Unearmarked Reserves
5.25 Following an increase in longer term interest rates in November 2025, the
opportunity was taken to prematurely repay £28 million of Public Works Loan
Board loans which had between 30 and 35 years left until maturity. As the
interest rates on these loans were lower than the comparative PWLB rates at
that time, a discount of £2.268 million was received from the PWLB, of which
£1.6 million accrues to the General Fund through reduced Loan Charges.
5.26 It is therefore proposed to reduce the General Fund Contribution to the
Capital Fund by £1.6 million which results in an increase in the level of
unearmarked Reserves.
5.27 Based on the latest information, the level of unearmarked Reserves at 31
March 2026 is projected to be £16.786 million or 3.3%.  This position will
change throughout the financial year as more information becomes available.
5.28 The level of unearmarked Reserves has increased by £4.634 million since
the last update in November for three main reasons.  Firstly, the treasury
activity set out in paragraph 5.21 contributed £1.6 million, secondly the
movement from a projected overspend to a projected underspend contributed
a further £2.573 million (see paragraph 1.2) and the additional contribution to
Reserves included in paragraph 5.1.
5.29 The Reserves Strategy sets out a range of between 2% and 4%.
6. Financial Risks
6.1 In preparing the Council's revenue monitoring, officers have considered the
key strategic, operational and financial risks facing the Council over this
period.  Whilst the risks may be managed in the current financial year, there is
the potential for there to be an impact in the future.
6.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure.
6.3 Risks are captured within the body of the report with a summary being
maintained in Appendix 8.

Page 16

6.4 As set out above, following a prolonged period of severe weather there is
now a risk that the budget for responding to this is insufficient in the current
year.  The actual impact of this on the level of unearmarked Reserves will be
included in the final revenue monitoring report in April 2026.
6.5 Going forward, risks to the 2025/26 Revenue Budget and beyond will be
captured with mitigating actions identified.
7. Conclusion
7.1 This report provides an update on the financial performance of Perth and
Kinross Council for 2025/26. The report highlights a projected net underspend
of £2.234 million.
7.2 The report also outlines several adjustments to the 2025/26 Revenue Budget,
including additional funding from the Scottish Government and various
virements to ensure the budget aligns with current service needs.
7.3 Financial risks are identified and mitigated through detailed budget monitoring
and the availability of general fund balances.
7.4 The latest monitoring indicates that the Council will have unearmarked
General Fund balances of £16.786 million or 3.3% on 31 March 2026.
7.5 The report recommends approval of the proposed budget adjustments and
notes the importance of continued vigilance in managing financial risks.
8. Impact and Value Assessment
8.1 This is an operational report, and as such, an impact and value assessment is
not required.
9. Appendices
Appendix 1 – 2025/26 Management Budget
Appendix 2 – General Fund 2025/26 Projected Outturn – Service Analysis
Appendix 3 – Perth and Kinross Health and Social Care Partnership - 2025/26
Projected Outturns
Appendix 4 – Housing Revenue Account 2025/26 Projected Outturns
Appendix 5 - Other Grant Funding
Appendix 6 - General Fund Reserves Update
Appendix 7 - Council Approved Revenue Budget Flexibility
Appendix 8 - Financial Risks