Democracy Spraffa

Agenda Document Pack - Finance and Resources Committee - 26/11/2025

Perth and Kinross Council · 26 November 2025
Back to Finance and Resources Committee — 26 November 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
19/11/2025 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 26 November 2025 at 13:00. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Stewart Donaldson  (Convener)
Councillor Eric Drysdale  (Vice-Convener)
Bailie Chris Ahern
Councillor Keith Allan
Councillor Peter Barrett
Councillor Dave Cuthbert
Councillor John Duff
Councillor David Illingworth
Councillor Ian Massie
Provost Xander McDade
Councillor Tom McEwan
Bailie Claire McLaren
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Page 1 of 104

Page 2

Page 2 of 104

Page 3

Finance and Resources Committee 
Wednesday, 26 November 2025 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTES   
3(i)  MINUTE OF MEETING OF THE FINANCE AND RESOURCES
COMMITTEE OF 1 OCTOBER 2025 FOR APPROVAL
(copy herewith) 
5 - 8 
3(ii)  MINUTE OF MEETING OF THE EMPLOYEES JOINT
CONSULTATIVE COMMITTEE OF 16 JUNE 2025 FOR NOTING
(copy herewith) 
9 - 14 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 25/325) 
15 - 16 
5 APPOINTMENTS TO COMMITTEES
Finance and Resources Committee is asked to appoint Councillor
Ian Massie to the vacancy on the Executive Sub-Committee of the
Finance and Resources Committee. 
6 2025/26 REVENUE BUDGET - UPDATE NO. 2
Report by Chief Finance Officer (copy herewith 25/326) 
17 - 50 
7 COMPOSITE CAPITAL BUDGET 2025/31 AND HOUSING
INVESTMENT PROGRAMME 2025/30 – MONITORING REPORT
NO.2
Report by Chief Finance Officer (copy herewith 25/327) 
51 - 80 
8 TREASURY ACTIVITY AND COMPLIANCE REPORT 2025/26 –
6 MONTHS TO 30 SEPTEMBER 2025
Report by Chief Finance Officer (copy herewith 25/328) 
81 - 96
Page 3 of 104

Page 4

9  MISSING SHARES SERVICE - UPDATE ON PROGRESS AND
NEXT STEPS
Joint report by Strategic Lead - Housing and Communities and
Chief Finance Officer (copy herewith 25/323) 
97 - 104 
Page 4 of 104

Page 5

Finance and Resources Committee 
Minute of hybrid meeting of the Finance and Resources Committee held in the
Council Chamber, 2 Hight Street, Perth on Wednesday 1 October 2025 at 2.00pm. 
Present: Councillors S Donaldson, Provost X McDade, Depute Provost A Parrott,
Bailies C Ahern and C McLaren, H Anderson (substituting for K Allan), P Barrett,
D Cuthbert, E Drysdale, J Duff, D Illingworth, I Massie (substituting for G Laing),
T McEwan, J Rebbeck, C Shiers, and C Stewart. 
In Attendance: T Glen, Chief Executive; J Pepper; Chief Officer, HSCP; J Menzies,
D Mitchell and Z Robertson (all Perth and Kinross HSCP); S Walker, Strategic Lead -
Finance and Business Support; S Coyle, J Jennings and J Salisbury (Finance and
Business Support), S Crawford, Strategic Lead – Property Services; J Beveridge and
N Lennon (Property Services); S Merone, Strategic Lead – Economy, Development
and Planning; S MacDonald (Economy, Development and Planning); D Macluskey,
Strategic Lead – Education and Learning; E Ritchie, Strategic Lead - Housing and
Communities; A Clegg, D Stokoe, H Hope, J McColl and M Roy (Housing and
Communities) D Davidson, R Haynes, P Leonard (Environment and Infrastructure),
L Brady,  L Colledge, N Sutherland, S Watt and C Wright  (Customer and Digital
Services); C Guild, Strategic Lead – Projects and Programmes; N Ballentine
(Projects and Programmes); L Simpson, Strategic Lead – Legal and Governance;
L Stewart, V Robertson, K Molley, A Brown and M Pasternak (all Legal and
Governance). 
Apologies: Councillor K Allan and Councillor G Laing 
Councillor S Donaldson, Convener, Presiding. 
1. Welcome and Apologies 
The Convener welcomed all those present to the meeting and apologies were
noted as above. 
2. Declarations of Interest 
There were no declarations made in terms of the Councillors’ Code of
Conduct. 
3. Minute of Meeting of the Finance and Resources Committee of 25 June
2025 
The minute of meeting of the Finance and Resources Committee of 25 June
2025 was submitted and approved as a correct record. 
4. Outstanding Business Statement 
Resolved:
The status of action in the Outstanding Business Statement (25/247) be noted
and completed actions removed accordingly. 
3(i)
Page 5 of 104

Page 6

5. 2025/26 Revenue Budget - Update No. 1 
There was submitted a report by the Chief Finance Officer (25/248) providing
an update on progress with the 2025/26 General Fund Revenue Budget based upon
the June 2025 ledger, updated for any subsequent known material movements, and
the projected financial position of the Housing Revenue Account. 
Resolved:
(i) The contents of Report 25/248, be noted.
(ii) The projected outturn for the General Fund, as set out in Section 4 of Report
25/248 and Appendices 1 and 2, be noted.
(iii) The projected outturn for Corporate Budgets, as set out in Section 6 of Report
25/24, be noted.
(iv) The adjustments to the 2025/26 General Fund budgets, as detailed in Section
5 of Report 25/248 and Appendices 1, 2, 4, 5, 6, 7 and 8, be approved.
(v) The financial risks, as set out in Section 6 of Report 25/248 and Appendix 9,
be noted.
(vi) A report on the HSCP Financial Position be submitted to full Council on 29
October 2025.   
6. Composite Capital Budget 2025/31 and Housing Investment Programme
2025/30 – Monitoring Report No.1 
There was submitted a report by the Chief Finance Officer (25/249) (1)
providing a summary position to date for the 6-year Composite Capital Budget for
2025/26 to 2030/31 and the 5-year Housing Investment Programme for 2025/26 to
2029/30; and (2) seeking approval for adjustments to the programmes. 
Resolved:
(i) The contents of Report 25/249, be noted.
(ii) The proposed adjustments to the six-year Composite Capital Budget 2025/26
to 2030/31, as set out in Sections 4 and 5 of Report 25/249 and summarised
in Appendices I and II, be approved.
(iii) The proposed adjustments to the Housing Investment Programme Budget
2025/26 to 2029/30, as set out in Section 6 of Report 25/249 and summarised
in Appendix III, be approved.
(iv) Progress with the delivery of major Capital projects, as summarised in
Appendix IV to Report 25/249, be noted.
(v) The financial risks, as set out in Section 8 of Report 25/249 and Appendix V,
be noted. 
(There followed a 10-minute recess and the Committee reconvened at 3.50pm) 
(The Committee agreed to vary the order of business) 
7. Procurement Update 
There was submitted a report by the Strategic Lead – Legal and Governance
(25/251) providing an update on the Council’s procurement activity, setting out an
Annual Procurement Report for financial year 2024/25. 
Page 6 of 104

Page 7

Resolved:
(i) The publication of the Procurement Annual Report 2024/25 be approved.
(ii) The record of tenders accepted during 2024/25 under the Council’s scheme of
delegation, be noted.
(iii) Monies provided to third parties under the Code of Guidance for Following the
Public Pound during 2024/25, be noted. 
8. Transformation and Change Programme Update 
There was submitted a report by the Strategic Lead – Projects and
Programmes (Interim) (25/250) providing (1) an update on progress of the
Transformation and Change Programme - Phase Two; and (2) an overview of the
Best Value Audit thematic review on Transformation and Change which completed in
August 2025. 
Resolved:
(i) The revised Transformation and Change Strategy 2025-28 setting out the
updated approach to progress phase two of the programme and beyond be
approved.
(ii) Progress made on the Transformation & Change Programme Phase Two,
including the conclusion of the Best Value thematic audit, since the last
update report to Full Council 7 May 2025, be noted.
Page 7 of 104

Page 8

Page 8 of 104

Page 9

Perth and Kinross Council
Finance and Resources Committee
Employees Joint Consultative Committee 
Minute of hybrid meeting of the Employees Joint Consultative Committee held in the
Council Chambers, 2 High Street, Perth on Monday 16 June 2025 at 1.30pm. 
Present: Representing Perth and Kinross Council: 
Councillors K Allan, S McCole and J Rebbeck. 
Present: Representing Trade Unions: 
K Currie (Unite the Union) (up to and including Item 8)
S Topen-Cooper (NASUWT)
C Weston (EIS) 
In Attendance:  E Bayne, J Guild, P Johnstone, F MacKay, L McGeorge,
L Hamilton, F Thomson and S Turner. 
Apologies: N Ferry, S Hope, M Mackie and S Robertson. 
Councillor S McCole in the Chair. 
1. Welcome and Apologies 
Councillor McCole welcomed all present to the meeting and apologies were
noted as above. 
2. Declarations of Interest 
There were no declarations of interest made in terms of the Councillors’ Code
of Conduct. 
3. Minute of Meeting of Employees Joint Consultative Committee of
26 March 2025 
The minute of meeting of the Employees Joint Consultative Committee of
26 March 2025 was submitted and approved as a correct record. 
4. Matters Arising 
(i) Fair Work First 
P Johnstone advised that an exemption has been submitted and approved in
relation to Trainee Educational Psychologists who are funded via Scottish
Government and are not paid real living wage. 
P Johnstone advised work continues in conjunction with Unions with a view to
achieving a signed agreement for publication online.   
3(ii)
Page 9 of 104

Page 10

5. Health and Safety Performance Report Quarter 4 2024/25 – January –
March 2025 
There was a report submitted by the Corporate Health and Safety Team
Leader (G/25/74) informing and assisting the Employees Joint Consultative
Committee in monitoring health and safety compliance and performance
across Perth and Kinross Council and providing an overview of health and
safety activities undertaken. 
In response to a question from S Topen-Cooper regarding medication errors
made by staff and whether this is a training error, L Hamilton confirmed all
instances are thoroughly looked into and any training requirements
addressed. 
In response to a question from K Currie regarding an example of a medication
error, L Hamilton advised this is most often a double dose or missed dose by
teams working in clients’ homes. 
Resolved:
The contents of Report G/25/74, be noted. 
6. Fire Safety Quarterly Report – Quarter 4 2024/25 – January – March 2025 
There was a report submitted by the Corporate Health and Safety Team
Leader (G/25/75) informing and assisting the Employees Joint Consultative
Committee in monitoring fire safety performance across Perth and Kinross
Council and providing an overview of fire safety activities undertaken. 
Resolved:
The contents of Report G/25/75, be noted. 
7. Health and Wellbeing Update 
There was a report submitted by the People and Culture Manager (G/25/76)
providing an update on current Health and Wellbeing data and current Health
and Wellbeing activities. 
In response to a question from S Topen-Cooper regarding the Employee
Assistance Programme and access for staff out with work, E Bayne confirmed
all information is accessible via mobile phone or personal laptop and not
exclusively a PKC device.  E Bayne added that this is reflected in
communications to staff. 
Resolved:
The contents of Report G/25/76, be noted. 
8. Staff Reporting: Incidents of Violence/Aggression and incidents of
Distressed/Challenging Behaviour in Education Settings – Term 3
2024/25   
There was a report submitted by the Service Manager, Inclusion and
Additional Support and Inclusion Quality Improvement (G/25/77) informing
Page 10 of 104

Page 11

Employees Joint Consultative Committee of the Education Service’s
performance in managing and reducing incidents of violence and aggression
or distressed and challenging behaviour that have impacted staff in the
workplace. The report provides a summary of the information gathered in
Term 3 of academic year 2024/2025 in relation to staff reports of incidents in
schools and other educational settings which had an emotional or physical
impact on them. It also provides information on the activity of an established
working group to prevent and reduce the number of incidents. 
There was a slide-based presentation by S Turner, Principal Educational
Psychologist, in relation to Relationships and Behaviour covering the journey
so far, individual needs, whole school development, workforce support and
development, partnerships, nurturing relationships and areas under
development. 
In response to a question from C Weston regarding partnerships with parents
unwilling to engage, S Turner acknowledged that this does make the process
more difficult, but staff will endeavour to ensure other positive partnerships are
established. 
In response to a question from S Topen-Cooper regarding work in relation to
social, emotional and behavioural needs, F Mackay advised this is an area of
priority as part of the ASN transformation work ongoing which will begin from
Term 1 of the next session throughout primary and secondary. 
In response to a question from Councillor McCole regarding consistent
messaging throughout all school years, S Turner confirmed it is of importance
that the whole school nurturing programme and key interventions cover 2-18
years.  S Turner added that the Bounce Back programme has also now been
extended into early years of secondary. 
In response to a question from C Weston regarding a zero tolerance
approach, F Mackay confirmed Scottish Government principles are followed to
set age appropriate boundaries and expectations.  F Mackay continued that
further national direction is awaited. 
Councillor McCole extended her thanks to S Turner for the informative
presentation. 
Resolved:
The contents of Report G/25/77, be noted. 
(K Currie left the meeting at this point.) 
9. Leadership Development Activity 
There was a report submitted by the Resourcing and Change Manager
(G/25/78) providing an update to Committee on recent and planned activity
designed to develop the skills and knowledge of our current and potential
leadership cohort. 
Page 11 of 104

Page 12

Resolved:
The contents of Report G/24/78, be noted and the plans outlined, be
endorsed. 
10. End Violence at Work Charter 
There was submitted a report by the Resourcing and Change Manager
(G/25/73) to gain agreement to the commitment to the Unison End Violence at
Work Charter. 
In response to a question from S Topen-Cooper whether it is PKC’s intention
to adopt a zero-tolerance approach towards violence, Councillor McCole
advised national guidance will continue to be followed but the Council’s
position can be considered and brought back to a future meeting. 
Resolved:
(i) The requirements of the Unison End Violence at Work Charter and the
evidence currently available indicating the Council’s compliance with these,
be noted.
(ii) The Council’s commitment to the requirements of the Charter, initially on the
basis of meeting these in full within 12 months of the date of the meeting, be
agreed. 
11. Employee Survey Update 
F Thomson, Resourcing and Change Manager, advised that the next
Employee Survey will go live in autumn of this year.  A working group is in
place with focuses on clarity of instruction to ensure all responses are
completed with equal intention, developing similar questions to the last survey
to allow trends to be established, and engagement promotion to maximise
completion. 
Resolved:
The Committee noted the update. 
12. Update to Employees Joint Consultative Committee Constitution 
There was submitted a report (G/25/79) amending the Employees Joint
Consultative Committee Constitution to reflect a change in Elected Member
membership from four members to three members, as agreed by Perth and
Kinross Council on 5 March 2025. 
Councillor McCole advised this is a regrettable change and will continue to
encourage an appointment with a view to increasing the Membership again in
future. 
Resolved: 
The updated constitution, be noted. 
Page 12 of 104

Page 13

13. Any Other Competent Business 
(i) Supreme Court Ruling 
P Johnstone advised on the recent Supreme Court Ruling in relation to the
Equality Act 2010.  P Johnstone confirmed that further updates are awaited
from the Equality and Human Rights Commission, but any staff impacted are
encouraged to seek additional support as required from HR or PKC’s
Equalities Team Lead. 
14. Date of Next Meeting 
Wednesday 17 September at 1.30pm in Room 410, 2 High Street, Perth. 
Page 13 of 104

Page 14

Page 14 of 104

Page 15

Finance and Resources Committee 
Outstanding Business Statement (OBS) 
(Report No. 25/325) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
40. 1 October
2025
Item 5. 
2025/26 Revenue
Budget – Update
No. 1 
Information to be shared
with members on which
other greenspace groups
operate in Perth and
Kinross similarly to the
Blairgowrie & Rattray
Access Network in terms
of supporting
communities. 
Response was circulated
to members via email on
13 October 2025. 
Elaine Ritchie  Complete  26
November
2025
41.  1 October
2025
Item 5. 
2025/26 Revenue
Budget – Update
No. 1 
An EM Briefing note be
provided on the Extended
Producer Responsibility
for packaging scheme and
the reasons for the
reduction in income. 
Response was circulated
to members via email on
11 November 2025. 
Pete Leonard /
Scott Walker 
Complete 26
November
2025 
42.  1 October
2025
Item 7. 
Procurement
Update 
Clarification to be provided
on Tenders Accepted –
Uniform Planning and
Glass Recycling.
Response was circulated
to members via email on
6 October 2025. 
Lynzi Stewart /
Vanessa
Roberston 
Complete  26
November
2026 
43. 1 October
2025
Item 7. 
Procurement
Update 
Information to be shared
with members on payment
to the University of
Edinburgh for SLA.
Response was circulated
to members via email on
6 October 2025. 
Lynzi Stewart /
Vanessa
Robertson 
Complete  26
November
2025 
4
Page 15 of 104

Page 16

No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
44.  1 October
2025
Item 7.
Procurement
Update 
Information to be shared
with members on Village
Hall Administration
Grants.
Response was circulated
to members via email on
6 October 2025. 
Lynzi Stewart /
Vanessa
Robertson 
Complete  26
November
2025 
Page 16 of 104

Page 17

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee: Finance and Resources Committee 
Date of Meeting: 26 November 2025 
Report Title: 2025/26 Revenue Budget – Update No. 2 
Report Number: 25/326 
Report Author: Scott Walker, Chief Finance Officer 
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to provide an update on progress with the
2025/26 General Fund Revenue Budget based upon the August 2025 ledger,
updated for any subsequent known material movements, and the projected
financial position of the Housing Revenue Account. 
1.2 The total net projected overspend on the 2025/26 General Fund Management
Budget, currently is £339,000 (see Appendix 1).  This has reduced since the
last update following the decision of Council on 29 October to apply up to
£4.180 million to address the growing in-year demand for social care. 
1.3 Sections 
1. Purpose
2. Recommendations
3. Background
4. 2025/26 Revenue Monitoring
Service Budgets
Corporate Budgets
Funding
Other Updates
5. 2025/26 Revenue Budget Adjustments
Additional Funding
Virements
Movements In Reserves
6. Financial Risks
7. Conclusion
8. Impact and Value Assessment
9. Appendices 
6
Page 17 of 104

Page 18

2. Recommendations 
It is recommended that the Committee: 
2.1 Note the contents of the report, 
2.2 Note the projected outturn for the General Fund set out in Section 4 and
Appendix 1 and 2, 
2.3 Approve the adjustments to 2025/26 General Fund budgets set out in Section
5 and Appendices 1,2,4,5,6 and 7 
2.4 Note the financial risks set out in Section 6 and Appendix 8. 
3. Background 
3.1 This report updates the Committee on progress with the 2025/26 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the August 2025 ledger,
updated for any subsequent known material movements. 
3.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2025/26 Revenue Budget on 26
February 2025 (Report No. 25/36 refers).  In addition, adjustments approved
by the Finance and Resources Committee on 30 April, 25 June and 1 October
2025 (Report No’s 25/99, 25/172 and 25/248 refer) are reflected in Appendix
1 (Column 2).  In addition, approval to apply additional resources to Perth and
Kinross Health and Social Care Partnership on 29 October 2025 is also
reflected ( Report No /25/278 refers). 
4. 2025/26 Revenue Monitoring 
Service Budgets 
4.1 The total net projected overspend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £300,000 which represents 0.1%
of total net Service expenditure. 
4.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
4.3 The management of Service over and underspends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
4.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets. 
Page 18 of 104

Page 19

Education and Learning 
4.5 There is currently a projected underspend for Education and Learning
excluding Devolved School Management (DSM) and the Pupil Equity Fund
(PEF) of £51,000 or 0.03% of the budget which represents a positive
movement of £51,000.  The individual elements contributing to this position
are summarised in the following table with commentary on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Education and Learning Core Overspend 6 0.5 -
Nursery Sector Underspend (361) (1.1) 180
Primary Sector Overspend 1,114 2.0 -
Secondary Sector Underspend (489) (8.7) 171
Special Sector Overspend (41) (0.2) (122)
Home to School Transport Underspend (280) (2.0) (280)
TOTAL Underspend (51) (0.0) (51) 
4.6 In the Nursery Sector, there is a reduction in the projected underspend of
£180,000 due to updated staff cost projections. 
4.7 Within the Secondary Sector, there is a reduction in the projected
underspend of £171,000 due to updated staff cost projections. 
4.8 In the Special Sector there is a reduction in the projected net overspend of
£122,000 due to updated staff cost projections and reductions in the cost of
independent school placements. 
4.9 In Home to School Transport there is a projected under spend of £280,000
due to a reduction in the number of school days, smaller increase than
budgeted and a rationalisation of vehicles. 
4.10 The Devolved School Management Scheme is currently projected to be on
target.  However, some schools are experiencing challenges in delivering
approved staff slippage targets and facing inflationary pressures against
budgets that have been reduced over previous years.  The budgets for the
Devolved School Management scheme are allocated by financial year (April –
March), whereas expenditure is incurred by academic year (August – June). 
4.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be on target. 
Children, Families and Justice 
4.12 There is currently a projected underspend for Children, Families and Justice
of £270,000 or 1.0% of the approved budget, which represents the same
position as the last update to Committee.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Page 19 of 104

Page 20

Function Projected Outturn Movement 
£’000 % £’000
Children & Families Underspend (270) (1.2) -
Justice Service On Target - - -
TOTAL Underspend (270) (1.0) - 
4.13 In Children and Families, there is a reduction in the projected overspend on
staff costs which is offset by an increase in the cost of residential placements. 
Economy, Development and Planning 
4.14 There is currently a projected underspend for Economy, Development and
Planning of £53,000 or 0.3% of the approved budget which represents a
positive movement of £201,000.  The individual elements contributing to this
position are summarised in the following table with narrative on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Overspend 47 0.8 (30)
Tourism, Culture and Place Overspend 100 2.1 29
Development Management and
Building Standards
Underspend (200) - (200)
TOTAL Underspend (53) 0.3 (201) 
4.15 In Development Management and Building Standards, there is an
increase in the projected underspend of £200,000 due to additional income
from planning applications. 
Environment and Infrastructure 
4.16 The projected outturn for Environment and Infrastructure is currently
anticipated to be £525,000 or 1.6% more than budget, which represents an
adverse movement of £500,000.  The individual elements contributing to this
position are summarised in the following table with narrative on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Overspend 500 (4.0) 500
Traffic and Network Underspend (100) (8.0) (50)
Waste Disposal Underspend (250) (2.9) -
Refuse Collection Overspend 175 3.4 -
Fleet Overspend 200 - 50
TOTAL Overspend 525 1.6 500 
4.17 Service wide there is a projected overspend of £500,000 due to updated staff
cost projections which currently indicate that the budgeted slippage target will
not be achieved. 
Page 20 of 104

Page 21

4.18 In Traffic and Network there is an increase in the projected underspend of
£50,000 due to additional income from statutory road network charges. 
4.19 In Fleet, there is an increase in the projected overspend of £50,000 following
a review of vehicle materials and repairs. 
Housing and Communities 
4.20 The projected outturn for Housing and Communities is currently anticipated
to be £257,000 or 1.3% more than budget, an adverse movement of
£273,000.  The individual elements contributing to this movement are
summarised in the following table with commentary on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Bereavement Services Overspend 14 1.7 -
Public Transport Unit Overspend 75 (0.5) 105
Parking and Civil
Contingencies
Overspend 94 - 94
Specialist Services Overspend 74 1.16 74
TOTAL Overspend 257 1.3 273 
4.21 In the Public Transport Unit there is a reduction in the projected underspend
of £105,000 due additional expenditure on park and ride services and Perth
Bus Station, and a reduction in income from park and ride departure charges. 
4.22 Within Parking and Civil Contingencies there is a projected overspend of
£94,000 on the visitor ranger service due to additional demands for the
service in the year to date. 
4.23 In Specialist Services, there is a projected overspend of £74,000 due to set
up costs for temporary accommodation due to increased demand. 
Property Services 
4.24 The projected outturn for Property Services is currently anticipated to be
£154,000 or 0.2% more than budget, a positive movement of £68,000.  The
individual elements contributing to this movement are summarised in the
following table with commentary on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide  Overspend 662 1.5 (116)
Energy Underspend (780) (10.0) 60
Facilities Management Overspend 418 12.2 -
Catering Underspend (146) (1.7) (12)
TOTAL Overspend 154 0.2 (68) 
Page 21 of 104

Page 22

4.25 On a Service Wide basis, there is a reduction in the projected overspend of
£116,000.  This is due primarily to savings on water consumption following a
recent audit. 
4.26 On Energy, there is a reduction in the projected underspend of £60,000
based on the latest consumption information. 
Legal and Governance 
4.27 Within Legal and Governance there is a projected underspend of £108,000
or 2.6%, which represents an adverse movement of £53,000.  This is made
up of updated assumptions on income, staff costs and supplies and services. 
Customer and Digital Services 
4.28 The projected outturn for Customer and Digital Services is currently
anticipated to be £13,000 or 0.1% less than budget, which represents a
favourable movement of £93,000.  The individual elements contributing to
this movement are summarised in the following table with commentary on the
significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
IT and Customer Services Underspend (87) (1.16) (37)
Revenues and Benefits Overspend 74 1.34 (56)
TOTAL Underspend (13) (0.1) (93) 
4.29 In IT and Customer Services and Revenues and Benefits there is an
reduction in the projected spend of £93,000 due to updated staff cost
projections. 
Strategic Planning, People and Performance 
4.30 The projected outturn for Strategic Planning and Performance is £116,000
or 1.8% less than budget which represents a favourable movement of
£48,000 due to updated staff cost projections 
Finance and Business Support 
4.31 The projected outturn for Finance and Business Support is currently
anticipated to be £25,000 or 0.2%, a favourable movement of £15,000 due to
updated staff cost projections. 
Scott Street Fire 
4.32 At this time, there are no costs included within the Service monitoring
information in relation to the fire that took place at Scott Street, Perth in June
2025. 
4.33 To date the Council has incurred costs of £841,000, with projections currently
exceeding £3.2 million.
Page 22 of 104

Page 23

4.34 Work continues with insurance companies to recover costs, and the Council
has appointed its own loss adjuster to represent it in the complex discussions. 
Dialogue is ongoing with the Scottish Government in relation to costs that may
not be recoverable. 
4.35 Further updates will be provided to future meetings of the Finance and
Resources Committee. 
Corporate Budgets 
4.36 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings is set out below. 
Health and Social care 
4.37 On 8 October 2025, Perth and Kinross Integration Joint Board considered a
report on the 2025/26 Financial Position, based on financial information to
month five (August 2025) and a financial recovery plan (Report No. G/25/158
refers). 
4.38 The financial recovery plan identified measures that could be delivered in the
current financial year (part A) which are reflected in the projected outturn
below, as well as other measures (part B) which will require further
consideration and may be deliverable over the longer term. 
4.39 The financial update included an updated projected net overspend across the
Health and Social Care Partnership of £4.608 million which is summarised in
the following table and in detail in Appendix 3.  This position remains
consistent with the financial challenges facing health and social care across
Scotland. 
Social
Care
£m 
Health
£m
Health and Social
Care Partnership
£m
Gross Projected Overspend 4.594 1.128 5.722
Application of Remaining
General Reserves
(0.164) - (0.164)
Financial Recovery Actions
- (Part A)
(0.250) (0.700) (0.950)
Net Projected Overspend 4.180 0.428 4.608 
4.40 On 29 October 2025, the Council agreed to provide up to £4.180 million of
additional financial support in 2025/26 (Report No. 25/278 refers).  This
funding will meet the costs associated with high service demand and provide
time to complete the work outlined in part A and B of the Financial Recovery
Plan. 
4.41 The Integration Joint Board will receive comprehensive impact assessments
on the part B options on 17 December 2025.  This information will be shared
Page 23 of 104

Page 24

with elected members at the Council meeting on 14 January 2026 and will be
available for consideration for the 2026/27 Revenue Budget. 
4.42 The Finance and Resources Committee will receive further updates as
information becomes available. 
Funding 
4.43 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
4.44 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
4.45 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 October 2025 together
with prior year comparative figures for the previous five financial years. 
4.46 Between 2020/21 and 2024/25, the average collection figure to 31 October
was 63.64%.  The actual collection figure to 31 October 2025 was 63.65%
which is 0.01% more than the five-year average and 0.11% more than the
comparable position in 2024. 
Page 24 of 104

Page 25

4.47 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
4.48 Currently, the level of Council Tax income is projected to be on target against
the budget assumptions which is reflected in Appendix 1. 
Non-Domestic Rates 
4.49 The actual collection rate to 31 October 2025 was 67.13%, compared to
67.43% for the same period in 2024/25.
71,000
72,000
73,000
74,000
75,000
76,000
77,000
01/04/2020
01/07/2020
01/10/2020
01/01/2021
01/04/2021
01/07/2021
01/10/2021
01/01/2022
01/04/2022
01/07/2022
01/10/2022
01/01/2023
01/04/2023
01/07/2023
01/10/2023
01/01/2024
01/04/2024
01/07/2024
01/10/2024
01/01/2025
01/04/2025
01/07/2025
01/10/2025
Council Tax - Number of Band D Equivalent Properties
budget Band D Equivalents
Page 25 of 104

Page 26

Other Updates 
Housing Revenue Account 
4.50 In terms of recurring activity across the Housing Revenue Account, a break-
even position is projected for the current financial year.  The main elements
are summarised below and set out in Appendix 4. 
4.51 Within this projection, there is a reduction in the projected underspend of
£132,000.  This is made up of the additional cost of the 2024/25 pay award
and the purchase of additional environment sensors for tenants’ homes. 
4.52 As a result of this movement, the amount of Capital from Current Revenue will
reduce by £132,000 in the current financial year. 
4.53 In terms of non-recurring activity across the Housing Revenue Account, there
requirement to draw down from the earmarked Reserve has reduced by
£22,000 which is reflected in Appendix 4. 
4.54 The net result of this latest monitoring on Housing Revenue Account Balances
is as follows – 
• HRA unearmarked Reserves - £1 million
• HRA earmarked Reserves - £829,000 
Real Living Wage 
4.55 On 30 October 2024, the Council agreed that in future financial years, any
uplift in the Real Living Wage would be implemented at the earliest possible
date (Council Minute 30 October 2024). 
4.56 On 22 October 2025, the Living Wage Foundation announced an increase in
the Real Living Wage (RLW) rate from £12.60 to £13.45 per hour,
representing a 6.75% increase. 
4.57 As an accredited Real Living Wage Employer, Perth and Kinross Council will
implement the new RLW rate of £13.45 per hour effective from 1 November
2025.  This change will be reflected in the November 2025 payroll, with
payment being made on 28 November 2025. 
4.58 There are 87 employees who will benefit from this increase and the cost to the
Council from 1 November 2025 to 31 March 2026 is £34,317 including
employer on costs. 
5. 2025/26 Revenue Budget Adjustments 
Additional Funding 
5.1 Since elected members were provided with the 2025/26 Revenue Budget
update on 1 October 2025 (Report No. 25/248 refers), notification has been
received of additional resources in the current financial year from several
Page 26 of 104

Page 27

sources as set out below.  To ensure that the 2025/26 Management Budget
continues to reflect the operational requirements of the Council, several
adjustments are required, which are summarised below and included either in
Appendix 1 or Appendix 5. 
Scottish Government – Revenue Support Grant:
• Resettlement Teams (Warm Scottish Welcome): £106,266 (Housing
and Communities)  
• Scottish School Milk Subsidy Scheme £28,000 (Property) 
5.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £134,266 will be made through a redetermination of
the Council’s funding.  It is therefore necessary to adjust budgets for Housing
and Communities, Property and Revenue Support Grant. 
Other Funding 
5.3 Other funding amounting to £1.754 million has been paid outside the
Revenue Support Grant mechanism as Other Grant income and is, therefore,
cost neutral in terms of the budget summary.  Details of this funding is set out
in Appendix 5. 
5.4 ACTION: The Committee is asked to note the receipt of £1.754 million of
additional resources, with this funding being reflected within Economy,
Development and Planning and Environment & Infrastructure as additional
grant income.  The current projected outturn assumes that all these additional
resources will be fully expended in 2025/26 or will be carried forward under
the terms of the grant award. 
Virements 
Contribution to/from Capital Fund 
5.5 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or underspend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund. 
5.6 The latest monitoring indicates a projected increase in capital financing costs
(loan charges) of £222,000 based on the latest treasury management activity
and an increase of £539,000 in income from interest on revenue balances due
to reduced cashflows.  This will result in an increased Contribution to the
Capital Fund of £317,000 in the current financial year.  This is consistent with
the planned use of the Capital Fund to manage the revenue cost of supporting
the Capital budget over the short term. 
5.7 ACTION: The Committee is requested to approve the virement of £222,000 to
the Capital Financing Costs (Loan Charges) Budget and £539,000 to Interest
on Revenue Balances with a corresponding increase in the projected
Page 27 of 104

Page 28

Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 4) to this report. 
Service Virements 
5.8 To ensure that the 2025/26 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 4) that have been
processed in line with the Scheme of Administration. 
Movements In Reserves 
5.9 Included at Appendix 6 is an update on the Council’s General Fund Reserves
which includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2025 (per
unaudited Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2025/26, 2026/27 and 2027/28.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves. 
5.10 The earmarked Reserves are presented under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation, and the Council has limited discretion in
how they are applied. 
ii. Balances held for specific (previously approved) purposes – the purpose
of these earmarked Reserves has been previously approved by Council
in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
5.11 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration. 
Balances Held Under Statute / Regulation 
5.12 There are no adjustments to the earmarked Reserves held under statute or
regulation. 
Balances Held for Specific (Previously Approved) Purposes 
5.13 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
Page 28 of 104

Page 29

5.14 Specifically, authority is sought to adjust the following earmarked Reserves
identified below: 
• £38,000 from the Feasibility earmarked Reserve to support economic
development.
• £25,000 to the Community Resilience Reserve as this funding is no longer
required due to partnership working with other local authorities. 
5.15 ACTION: The Committee is asked to approve the transfers from earmarked
Reserves set out in paragraph 5.14 above.  These adjustments are reflected
in Appendix 1 (Column 5) to the report. 
Balances Held for Other Purposes 
5.16 Approval is sought for an adjustment relating to the earmarked Reserve for
Transformation and Workforce Management of £98,000 for the
modernisation of financial systems.   
5.17 ACTION: The Committee is asked to approve the transfer of £98,000 from the
Transformation and Workforce Management to Finance and Business
Support and Education & Learning for staffing. These adjustments are
reflected in Appendix 1 (Column 5) to the report. 
5.18 Approval is sought for an adjustment relating to the earmarked Reserve for
Anti-Poverty of £127,000. 
5.19 ACTION: The Committee is asked to approve the transfer of £127,000 from
the Anti-Poverty Reserve to Strategic Planning, People and Performance.
This adjustment is reflected in Appendix 1 (Column 5) to the report. 
5.20 It is proposed that the Council uses the Communities earmarked Reserve to
apply funding to enhance the standard of annual weed control in Council
managed streets including roundabouts and publicly accessible hard surfaces
in some housing areas.  Part of this will be to trial a growth retardant so as to
not increase the quantity of glyphosate used. 
5.21 Therefore, approval is sought to apply £110,000 from the Communities
earmarked Reserve (two years at £55,000 per annum) to allow the trial to take
place.  Should this be successful this would come back as an expenditure
pressure in future revenue budgets. 
5.22 ACTION: The Committee is asked to approve the transfer of £110,000 from
the Communities earmarked Reserve to Housing and Communities for annual
weed control for two years. This adjustment is reflected in Appendix 1
(Column 5) to the report. 
Unearmarked Reserves 
5.23 Based on the latest information, the level of unearmarked Reserves at
31 March 2026 is projected to be £12.132 million or 2.4%.  This position will
change throughout the financial year as more information becomes available.
Page 29 of 104

Page 30

5.24 There are three reasons for the reduction in both the level and percentage of
unearmarked Reserves.  Firstly, this update assumes a net overspend in the
current year of £339,000 million or 0.1% (there is a risk that this figure
increases).  Secondly, there is a planned contribution from unearmarked
Reserves of £1.989 million or 0.4% (in the 2026/27 and 2027/28 Provisional
Revenue Budgets there is a net contribution of £1.062 million or 0.2% back
to unearmarked Reserves).  Thirdly, the impact of previous decisions,
including the contribution of £4.180 million towards the growing demand in
social care 
5.25 The Reserves Strategy sets out a range of between 2% and 4%. 
6. Financial Risks 
6.1 In preparing the Council's revenue monitoring, officers have considered the
key strategic, operational and financial risks facing the Council over this
period.  Whilst the risks may be managed in the current financial year, there is
the potential for there to be an impact in the future. 
6.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
6.3 Risks are captured within the body of the report with a summary being
maintained in Appendix 8. 
6.4 No new risks have been identified. 
6.5 Going forward, risks to the 2025/26 Revenue Budget and beyond will be
captured with mitigating actions identified. 
7. Conclusion 
7.1 This report provides an update on the financial performance of Perth and
Kinross Council for 2025/26. The report highlights a projected net overspend
of £339,000.  This is after the application of up to £4.180 million to support
the social care pressures in 2025/26. 
7.2 The report also outlines several adjustments to the 2025/26 Revenue Budget,
including additional funding from the Scottish Government and various
virements to ensure the budget aligns with current service needs. 
7.3 Financial risks are identified and mitigated through detailed budget monitoring
and the availability of general fund balances. 
7.4 The latest monitoring indicates that the Council will have unearmarked
General Fund balances of £12.132 million or 2.4% on 31 March 2026. 
7.5 The report recommends approval of the proposed budget adjustments and
notes the importance of continued vigilance in managing financial risks.
Page 30 of 104

Page 31

8. Impact and Value Assessment 
8.1 This is an operational report, and as such, an impact and value assessment is
not required. 
9. Appendices 
Appendix 1 – 2025/26 Management Budget
Appendix 2 – General Fund 2025/26 Projected Outturn – Service Analysis
Appendix 3 – Perth and Kinross Health and Social Care Partnership - 2025/26
Projected Outturns
Appendix 4 – Housing Revenue Account 2025/26 Projected Outturns
Appendix 5 – Other Grant Funding
Appendix 6 – General Fund Reserves Update
Appendix 7 – Council Approved Revenue Budget Flexibility
Appendix 8 – Financial Risks 
Page 31 of 104

Page 32

Page 32 of 104

Page 33

Appendix 1
(1) (2) (3) (4) (5) (6) (7) (8) (9)
2025/26 Previously Movements Virements Movements 2025/26 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 1
Service Budgets
Education and Learning 178,397 2,078 27 180,502 180,451 (51) (0.0%)
Children, Families and Justice 24,415 2,412 20 26,847 26,577 (270) (1.0%)
Economy, Development and Planning 14,857 1,031 (35) 38 15,891 15,838 (53) (0.3%)
Environment and Infrastructure 31,049 2,388 53 33,490 34,015 525 1.6%
Housing and Communities 18,772 293 106 (119) 30 19,082 19,339 257 1.3%
Property Services 65,316 629 28 16 65,989 66,143 154 0.2%
Legal and Governance 4,898 (677) 104 (91) 4,234 4,126 (108) (2.6%)
Customer and Digital Services 12,466 711 17 13,194 13,181 (13) (0.1%)
Strategic Planning, People and Performance 6,159 288 (40) 127 6,534 6,418 (116) (1.8%)
Projects and Programmes 527 90 617 617 0 0.0%
Finance and Business Support 8,521 1,919 71 10,511 10,486 (25) (0.2%)
Directorate Core Costs 570 (6) 564 564 0 0.0%
Sub - Total: Service Budgets 365,947 11,156 134 16 202 377,455 377,755 300 0.1%
SECTION 2
Corporate Budgets
Health and Social Care 106,313 499 (16) 4,180 110,976 110,976 0 0.0%
Contribution to Valuation Joint Board 1,421 1,421 1,421 0 0.0%
Capital Financing Costs 18,914 3,948 222 23,084 23,084 0 0.0%
Interest on Revenue Balances (3,936) 400 (539) (4,075) (4,075) 0 0.0%
Net Contribution to/(from) Capital Fund 5,331 (4,348) 317 1,300 1,300 0 0.0%
Contribution to/(from) Insurance Fund 4,000 4,000 4,000 0 0.0%
Trading Operations Surplus (550) (550) (550) 0 0.0%
Support Service External Income (2,323) (2,323) (2,323) 0 0.0%
Tayside Pension Fund 1,711 1,711 1,695 (16) (0.9%)
Apprenticeship Levy 956 956 1,011 55 5.8%
Pay Award (2,800) 2,800 0 0 0 0.0%
Leadership and Procurement (305) 305 0 0 0 0.0%
Council Tax Reduction Scheme 7,400 7,400 7,400 0 0.0%
Discretionary Relief 1,104 1,104 1,104 0 0.0%
Net Expenditure (General Fund) 503,183 14,760 134 0 4,382 522,459 522,798 339 0.1%
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2025/26 REVENUE
BUDGET - SUMMARY
6
Page 33 of 104

Page 34

Appendix 1
(1) (2) (3) (4) (5) (6) (7) (8) (9)
2025/26 Previously Movements Virements Movements 2025/26 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2025/26 REVENUE
BUDGET - SUMMARY
SECTION 3
Funding
Revenue Support Grant (304,896) (6,707) (134) (311,737) (311,737) 0 0.0%
Ring Fenced Grant (1,967) (1,922) (3,889) (3,889) 0 0.0%
Non Domestic Rate Income (63,537) (63,537) (63,537) 0 0.0%
Council Tax Income (119,157) (119,157) (119,157) 0 0.00%
Capital Grant (1,600) (1,600) (1,600) 0 0.0%
Total Financing (491,157) (8,629) (134) 0 0 (499,920) (499,920) 0 0.00%
Financed from/(returned to) Reserves 12,026 6,131 0 0 4,382 22,539 22,878 339
APPENDIX
1
Page 34 of 104

Page 35

APPENDIX 2
PERTH AND KINROSS COUNCIL - GENERAL FUND 2025/26 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 August 2025)
Variance Variance
£'000 £'000
EDUCATION AND LEARNING
Total (51)
NON DEVOLVED
Education and Learning Core
6 Projected overspend due to not meeting slippage target.
Nursery Sector
(361) Projected additional slippage over target due to turnover of staff and lower than anticipated staffing
required for deferred places.
Primary Sector
1,114 Slippage target projected not to be met within primary sector due to the requirement to have a
teacher in front of class at all times.
Secondary Sector
(489) Projected slippage in excess of target due to part year allocation of fte required for new Intensive
Support Provisions.
Special Sector
(266) Projected slippage in excess of target due to previous trends in turnover of staff and challenges in
recruitment of posts in particular Pupil Support Assistant.
225 Projected overspend on independent special schools due to increased number of placements.
Home to School Transport
(280) Projected underspend due to 6 less operating days in financial year 25/26 than 24/25, lower
inflationary uplift from previously agreed pressure and cost reduction due to rationalisation.
0 DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
Projected on Budget. Schools are finding slippage targets and increasing costs challenging to
manage and this is impacting on the resource spend in schools.
0 PUPIL EQUITY FUND
PEF spend projected on budget due to increased costs of Employers national insurance
contributions and pay awards.
CHILDREN, FAMILIES AND JUSTICE
Total (270)
Children and Families
55 Projected overspend due to not meeting slippage target offset by reduction in demand for some
services over 1st Quarter.
(630) Projected under spend on foster, kinship and adoption in part due to reduction in overall placements
in foster carers. This decrease in demand is linked to the new working practices which include a
greater focus on early intervention some of which is funded from the WFWF temporary funding.
305 Projected over spend on residential placements due to additional placements in excess of budget
and higher inflation uplifts than budgeted.
ECONOMY, DEVELOPMENT AND PLANNING
Total (53)
Service Wide
(30) Projected slippage across Economy, Development & Planning in excess of slippage target
57 Projected shortfall in sales ledger bad debt provision
20 Projected overspend for contribution towards Tay Cities Deal project management costs
Tourism, Culture and Place
100 Perth Harbour - projected increase in operating costs /shortfall in income.
(24) Underspend relating to events due to under recovery of income
24 Events, projected under recovery of income
Development Management & Building Standards
(200) Projected additional Planning Application income
SERVICE Summary of Service Variances
6
Page 35 of 104

Page 36

APPENDIX 2
PERTH AND KINROSS COUNCIL - GENERAL FUND 2025/26 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 August 2025)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
ENVIRONMENT AND INFRASTRUCTURE
Total 525
Service Wide
500 Projected non-achievement of slippage target across Environment & Infrastructure
Traffic and Network
(100) Projected additional income from statutory road network works.
Direct Services - Waste Disposal
(250) Projected additional income from sale of recyclates as a result of the new twin-streaming collection
and favourable market prices.
Direct Services - Refuse Collection
175 Projected net shortfall in commercial waste income
Direct Services - Fleet
200 Projected additional cost of vehicle materials and repairs.
HOUSING AND COMMUNITIES
Total 257
Bereavement Services
14 Projected over spend on loan charges.
Public Transport Unit
(45) Projected additional income from park and ride departure charges
46 Projected overspend in relation to park & ride expenditure
29 Projected overspend due to health & safety works and a shortfall in income at Perth Bus Station.
45 Projected overspend on tendered service
Parking, PTU & Civil Contingencies
94 Projected overspend on Visitor Rangers
Specialist Services
74 Projected overspend in property set-up costs for temporary accommodation
PROPERTY SERVICES
Total 154
Service Wide
423 Projected overspend as not yet meeting slippage target, increased costs for loan charges and
required works for tree surveys and emergency works across the portfolio. Movement due to
reduction in costs for water following audit.
232 Projected overspend on unitary charge due to increased interest rates and historic lifecycle costs
and low income from Campus RHI.
7 Projected increased costs for grass pitch lets across LAL settings.
Energy
(780) Projected reduction in energy costs due to reduced rates and consumption.
Facilities Management
196 Overspend due to delay in implementing new cleaning schedule required to achieve approved
saving and associated redundancy costs. New cleaning schedule for offices in place from 1 July
2025.
222 Projected overspend due to shortfall in income target for Pullar House lets in the current year due to
delays from public sector partners.
Catering
(146) Projected underspend due to lower than expected number of pupils entitled to free school meals
under Scottish Child Payments criteria.
Page 36 of 104

Page 37

APPENDIX 2
PERTH AND KINROSS COUNCIL - GENERAL FUND 2025/26 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 August 2025)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
LEGAL AND GOVERNANCE
Total (108)
54 Projected shortfall against slippage
1 Projected overspend on supplies and services
(163) Projected additional income across Legal and Governance (Short Term Lets £84,000, internal
recharges £14,000, Licences £35k, external recharges to Dundee City Council & Angus Council
£30,000).
CUSTOMER AND DIGITAL SERVICES
Total (13)
IT
(87) Projected underspend on staff costs.
Revenues and Benefits
(6) Projected underspend due to early delivery of future savings and slippage.
80 Projected shortfall due to increased service charges from Social Housing Providers that are not
covered by Housing Benefit Subsidy.
STRATEGIC PLANNING, PEOPLE AND PERFORMANCE
Total (116)
(116) Projected net under spend on staff costs, supplies and services and income partially offset against
not yet achieving approved savings.
PROJECTS AND PROGRAMMES
Total 0 No material variances at present
FINANCE AND BUSINESS SUPPORT Finance
Total (25)
(25) Projected underspend due to slippage in excess of  target due to turnover and early delivery of
savings.
TOTAL 300
Page 37 of 104

Page 38

Page 38 of 104

Page 39

APPENDIX 3
Perth and Kinross Health and Social Care Partnership
Projected outturn based on Revenue Monitoring to 31 August 2025
Social Care Health
Health &
Social Care
Partnership
£'000 £'000 £'000
DEVOLVED FUNCTIONS
Older People Services 2,523 1,604 4,127
Adult Services 1,850 (532) 1,318
Other Community Services (112) 0 (112)
Management/Commissioned/Other 333 78 411
Sub Total - Hospital & Community Health 4,594 1,150 5,744
P&K IJB Lead Partner 0 (1,450) (1,450)
Dundee & Angus Hosted Services Recharges In/Out 0 1,877 1,877
Sub Total - Lead Partner Arrangement 0 427 427
Acute / Whole System Pressures 0 (653) (653)
Total Lead Partner Arrangements 0 (226) (226)
GP Prescribing / Other Family Health Services 0 (250) (250)
General Medical Services / Family Health Services 0 454 454
Sub Total - PKHSCP 4,594 1,128 5,722
Approved Use of General Reserves in 2025/26 (164) 0 (164)
Financial Recovery Actions - Part A (250) (700) (950)
Total Projected Outturn Perth & Kinross HSCP 4,180 428 4,608
NON - DEVOLVED FUNCTIONS 0 0 0
TOTAL HEALTH AND SOCIAL CARE 4,180 428 4,608
Projected Out-turn Over /
(Under) Spend
6
Page 39 of 104

Page 40

Page 40 of 104

Page 41

APPENDIX 4
PERTH AND KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2025/26 PROJECTED OUTTURN
(Based on expenditure to 31 August 2025)
£'000
Service Wide
100 Projected additional pay award costs across the Housing Revenue Account
Repairs & Trades
600 Projected overspend on external voids due to use of external contractors.
200 Projected overspend on external repairs & maintenance due to use of external contractors and increased stock levels.
(600) Projected underspend within stores as a result of increased usage of external contractors.
(200) Projected underspend within Electrical Inspection Condition Report (EICR) contract as a result of less remedial works required.
32 Purchase of additional Internet Of Things Sensors for installing in tenant's homes
159 Housing Repairs - additional staff and fire assessments remedial work to be funded from earmarked reserves.
Improvements
(126) Projected additional Ofgem income for Renewable Heat Incentives
(11) Recharge to HEEPS ABS programme for Project Manager costs
87 Projected overspend in relation to cost of RAAC surveys and architects fees
50 Projected overspend in relation to cost of Energy performance Certificate works
69 Housing Improvements - additional staff to be funded from earmarked reserves.
Housing Localities
151 Localities - additional staff to be funded from earmarked reserves..
Specialist Services
50 Localities - additional staff and costs for downsizing scheme to be funded from earmarked reserves.
General Administration
139 Projected overspend on Void Council Tax based on 24/25 outturn.
500 Projected overspend on loan charges due to acceleration of capital programme including buy backs.
119 Projected overspend on corporate recharges based on 24/25 plus 3% due to increasing Council wide costs.
(494) Projected underspend on rent bad debt provision based on estimated rent arrears position.
157 Projected increase in insurance costs
Income
(66) Projected additional Interest on Revenue Balances income.
(650) Projected additional income based on stock levels.
CFCR
163 As a result of the projected net under spends highlighted above, this is the additional amount available to support the HRA capital
programme from the Revenue Budget.
429 Total over spend to be funded from earmarked reserve
HRA Reserve Information
1,258 Opening HRA Earmarked Reserve
429 Total proposed draw down from HRA Earmarked Reserve.
829 Projected Closing HRA Earmarked Reserve
1,000 HRA Unearmarked Reserve - 2.6% 
Summary of Service Variances
6
Page 41 of 104

Page 42

Page 42 of 104

Page 43

APPENDIX 5
Other Grant Funding
Economy, Development and Planning
Scottish Government 2025/26 Bus Infrastructure Fund Tier 2 £723,350
Environment & Infrastructure
Transport Scotland - People and Place Local Authority Direct Award £132,314
Transport Scotland - 20mph Strategy £898,190
TOTAL £1,753,854
6
Page 43 of 104

Page 44

Page 44 of 104

Page 45

APPENDIX 6
General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments Balance
31/3/25 25/26 26/27 27/28 25/26 Future
£m £m £m £m £m £m £m £m
General Fund Balance 68.284
Balances Held Under Statute / Regulation
- Revenue Grants 13.355 (1.814) (11.541) 0.000
- Service Concessions 13.262 (9.000) (2.000) (1.000) (1.262) 0.000
- Council Tax Income for affordable housing 4.796 (0.042) 0.283 0.283 (5.320) 0.000
- Developers Contributions: Affordable Housing 4.627 (4.627) 0.000
- Developers Contributions: Commuted Sums 1.202 (1.202) 0.000
- Car Parking 0.977 (0.168) (0.809) 0.000
- Devolved School Management 0.527 (0.527) 0.000
Sub total 38.746 (11.551) (1.717) (0.717) 0.000 0.000 (24.761) 0.000
Balances Held for Specific (Previously Approved) Purposes
- Council Approved Revenue Budget Flexibility 1.483 (1.343) 0.091 0.231
- Culture 0.499 (0.105) (0.216) 0.178
- School Estate 0.311 0.791 0.347 1.449
- Climate Change 0.295 0.295
- Works Maintenance 0.200 (0.090) 0.110
- Modern Apprentice Scheme 0.186 0.186
- School Counsellors 0.151 (0.151) 0.000
- Local Government Elections 0.106 0.053 0.053 (0.212) 0.000
- Events 0.097 (0.097) 0.000
- Cemetery Walls 0.080 (0.076) 0.004
- Salix 0.075 0.075
- Community Investment Fund 0.061 (0.047) 0.014
- Historic Child Abuse Scheme 0.050 0.050
- Financial Assistance (Mod) 0.040 0.020 0.020 0.020 0.100
Approved
Contributions (from) / to
Reserves
6
Page 45 of 104

Page 46

APPENDIX 6
General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments Balance
31/3/25 25/26 26/27 27/28 25/26 Future
£m £m £m £m £m £m £m £m
Approved
Contributions (from) / to
Reserves
- Local Area Partnerships 0.036 0.036
- Feasibility 0.100 0.100 0.100 (0.038) 0.262
- Health and Social Care 0.000 0.397 0.500 0.897
- pEPR Funding 0.000 0.000 (0.475) (0.356) 0.831 0.000
- Community Resilience 0.000 0.775 0.025 0.800
Sub total 3.770 (0.564) 0.773 (0.201) 0.078 0.000 0.831 4.687
Balances Held for Other Purposes 0.000
- Transformation & Workforce Management 4.837 (0.954) (0.550) (0.098) (0.923) 2.312
- Anti - Poverty 1.213 (0.038) (0.318) (0.050) (0.127) 0.680
- Communities 1.003 (0.280) (0.055) (0.055) 0.613
Sub total 7.053 (1.272) (0.868) (0.050) (0.280) (0.055) (0.923) 3.605
Earmarked Reserves 49.569 (13.387) (1.812) (0.968) (0.202) (0.055) (24.853) 8.292
Uncommitted General Fund Balance 18.715
Use of unearmarked Reserves in setting Budgets (1.989)
Impact of Current Year Decisions (4.255)
Impact of Current Year Projected Outturn (0.339)
Impact of proposals within this report 0.000
Updated Unearmarked General Fund Balance 12.132
Percentage of Net Revenue Budget 2.4%
Page 46 of 104

Page 47

APPENDIX 7
Council Approved Revenue Budget Flexibility
Housing and Communities
Vulnerable Persons Database - underspend to be returned to earmarked Reserves £(25,000)
Legal & Governance
Maintain existing Procurement Capacity until March 2027 £91,000
Total £66,000
6
Page 47 of 104

Page 48

Page 48 of 104

Page 49

Appendix 8
FINANCIAL RISKS
Risk to Revenue Budget Mitigation
1 Achievement of staff slippage targets, particularly
relating to teacher numbers and impact on pupil /
teacher ratio
- Proactive workforce
management
- Revenue monitoring
- Future budget submissions
2 Funding to Health & Social Care - Proactive management
- Financial Recovery Plan
- Revenue monitoring
- Future budget submissions
3 Inflation in excess of budgeted levels - Revenue monitoring
- Future budget submissions
4 Council Tax income - Revenue monitoring
- Future budget submissions
5 Extended Producer Responsibility for Packaging
income
- Revenue monitoring
- Future budget submissions
6
Page 49 of 104

Page 50

Page 50 of 104

Page 51

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee: Finance and Resources Committee 
Date of Meeting: 26 November 2025 
Report Title: Composite Capital Budget 2025/31 and Housing
Investment Programme 2025/30 – Monitoring Report
No.2 
Report Number: 25/327 
Report Author: John Jennings, Senior Accountant 
James Salisbury, Senior Accountant 
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________ 
1. Purpose 
1.1 This report provides a summary position to date for the 6-year Composite
Capital Budget for 2025/26 to 2030/31 and the 5-year Housing Investment
Programme for 2025/26 to 2029/30 and seeks approval for adjustments to the
programmes. 
1.2  Sections 
1. Purpose
2. Recommendations
3. Background
4. Composite Capital Programme – Gross Capital Resources
5. Composite Capital Programme – Expenditure
6. Housing Investment Programme
7. Budget Overview
8. Financial Risks
9. Impact and Value Assessment
10. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 notes the contents of the report. 
2.2 approves the proposed adjustments to the six-year Composite Capital Budget
2025/26 to 2030/31 set out in Sections 4 and 5 of the report and summarised
in Appendices I and II.
7
Page 51 of 104

Page 52

2.3 approves the proposed adjustments to the Housing Investment Programme
Budget 2025/26 to 2029/30 set out in Section 6 of the report and summarised
in Appendix III. 
2.4 notes progress with the delivery of major Capital projects as summarised in
Appendix IV. 
3. Background 
3.1 The Finance and Resources Committee approved an updated six-year gross
Composite Capital Budget for 2025/26 to 2030/31 totalling £559.588 million
and a five-year gross Housing Investment Programme for 2025/26 to 2029/30
totalling £89.027 million at its meeting on 1 October 2025 (report 25/249
refers). 
3.2 This monitoring report advises on current year expenditure to 31 October
2025, and the latest estimate of the projected outturn for each of the years to
2030/31 for the Composite Programme and 2029/30 for the Housing
Investment Programme. 
4. Composite Capital Programme – Gross Capital Resources 
4.1 The current estimated total gross capital resources (which includes
movements in Capital Receipts, Capital Grants, Contributions and borrowing)
available over the six years 2025/26 to 2030/31 amount to £560.047 million.
Movements from the revised Composite Capital Budget approved on 1
October 2025 for these six years are summarised in the table below, and the
constituent elements for each year are shown in Appendix I. 
Total Gross Composite Capital Resources 
Approved 
1 October 2025
Current
Estimate
Movement 
£M £M £M
2025/26 140.101 137.062 (3.039)
2026/27 113.258 112.742 (0.516)
2027/28 86.264 88.212 1.948
2028/29 69.249 71.157 1.908
2029/30 70.187 70.245 0.058
2030/31 80.529 80.629 0.100
Total 559.588 560.047 0.459  
4.2 The movement in the total Gross Resources for the 6 years 2025/26 to
2030/31 shown at Section 4.1 above can be summarised as follows: 
£’000
Increase in Capital Receipts (Section 4.3) 1
Increase in Third Party, Revenue and Developer Contributions
(Section 4.4) 
458     
Increase/(Decrease) in Borrowing (Section 4.5 and 4.6) 0
Total Increase in Gross Capital Resources (Section 4.1) 459   
Page 52 of 104

Page 53

4.3 There have been no movements in Capital Grants since the last monitoring
report, whilst the only movement in Capital Receipts is an increase of £1,000
in estimated Ring-Fenced Receipts in relation to Wheeled Bin Disposals
(Section 5.2.5). 
4.4 There is an increase of £283,000 in Third Party Contributions for Structural
Maintenance and £2,000 for Footways (Section 5.2.3). The remaining
adjustments for Third Party Contributions relate to carry forward adjustments
from 2024/25 which had been omitted from the last monitoring report on 1
October 2025, in respect to Destiny Bridge (£168,000) and ICT Data Analytics
(£5,000). There has been no movement in Revenue Contributions. 
4.5 The projected borrowing requirement in 2025/26, which is effectively the
balancing item for resources, is £118.320 million. This is £3.498 million
lower than the amount approved by this Committee on 1 October 2025
(£121.818 million). 
4.6 The total borrowing requirement in the subsequent years 2026/27 to 2030/31
has increased by £3.498 million to £310.677 million, resulting in no overall
increase in the total level of borrowing across the whole 6-year programme.
This movements in borrowing is summarised as follows: 
2025/26 2026/27 2027/28 Later
Years
Total 
£m £m £m £m £m
Movements relating to rephasing of
resources.
0.000 0.000 0.000 0.000 0.000
Movements arising from re-phasing
of expenditure and receipts
(Appendix II)
(3.498) (0.516) 1.948 2.066 0.000
Increase/(Reduction) in
Borrowing Requirement
(3.498) (0.516) 1.948 2.066 0.000 
4.7 The chart below shows the Capital Resources required to fund the 2025/26
Composite Capital Programme following the proposed budget adjustments
detailed in this report. 
86.3%
8.3% 0.4%
3.9%
0.6%0.5%
5.4%
Projected Capital Resources 2025/26
(November 2025)
Borrowing (£118.478M)
Grants (£11.375M)
Tay City Deal (£0.550M)
Developer Contributions (£5.344M)
Third Party & Revenue Contributions (£0.788M)
£Million
Page 53 of 104

Page 54

5. Composite Capital Programme – Expenditure 
5.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme 
5.1.1 Total expenditure (net of grants and contributions) to 31 October 2025 on the
Composite Capital Programme is detailed in Appendix II and summarised as
follows: 
Projected
Outturn 
(£m)
Net
Expenditure to
31 Oct 2025
(£m) 
% of
Projected
Outturn
Environment and Infrastructure  50.004 20.526 41%
Housing and Communities 5.901 1.502 25%
Economy, Development and Planning 31.435 7.941 25%
Property Services 36.652 17.998 49%
Customer and Digital Services 5.023 1.096 22%
Health and Social Care 0.953 0.668 70%
Unallocated 4.977 0.000 0%
Total Net Capital Expenditure 134.945 49.731 37% 
5.1.2 Appendix IV includes updates on the progress of delivering the Council’s
major Capital projects. 
5.2 Environment and Infrastructure 
5.2.1 The Strategic Lead has reviewed the programme for Environment and
Infrastructure and proposes various budget adjustments, the most significant
of which are described below. 
5.2.2 Within Traffic and Road Network, consultation is currently being undertaken
with the local community on the remaining works under the A977 Upgrades
programme. Therefore, it is proposed to move the budget of £177,000 from
the current year to 2026/27 in line with the revised anticipated timescales for
undertaking the work. 
5.2.3 Within the Roads Maintenance Partnership, there have been additional Third -
Party Contributions totalling £285,000. These relate to Structural Maintenance
(£283,000) for works at Tummel Crescent in Pitlochry, and Footways (£2,000)
for requests for dropped kerbs on Clova Avenue, Blairgowrie. The expenditure
budgets for each of these have been increased accordingly. 
5.2.4 Within Structures, it is proposed to move amounts for Old Perth Bridge and
Perth Queens Bridge. These adjustments are necessary due to a vacancy in
the Engineer post within the team (which has subsequently been filled),
allowing time for the reallocation of resources to these projects while
considering other high-priority tasks. Additionally, the increasing complexities
of the required consultancy services for these projects have contributed to the
need for these adjustments. The amounts have been distributed across future
years according to the revised anticipated spending on these projects. 
Page 54 of 104

Page 55

5.2.5 Within the Prudential Borrowing programme, it is proposed to equally spread
the Recycling in Schools project across the current year and next year, with
the project currently being out to tender. It is also proposed to increase the
expenditure budget for the Wheeled Bin Replacement Programme by £1,000
in respect of wheeled bin disposal receipts. 
5.2.6 The above proposed adjustments, together with other small movements, have
been reflected in Appendices I and II. 
5.3 Housing and Communities 
5.3.1 The Strategic Lead has reviewed the programme for Housing and
Communities and proposes the following budget adjustment. 
5.3.2 Within Community Greenspace, the timeframe for delivery of improvements to
Play Areas and Parks has been revised to reflect current resourcing capacity.
It is therefore proposed that £541,000 is moved from Community Greenspace
Sites to Play Areas and Parks across 2026/27 and 2027/28. Additionally, it is
proposed £194,000 is moved from the current year to 2026/27 in line with the
planned works timeframe. 
5.3.3 Also, within Community Greenspace, site testing for Cemetery Extensions is
ongoing and work is taking place to confirm land ownership.  The project is,
however, facing staffing resource constraints and the following rephasing is
proposed: 
2025/26
£m
2026/27
£m
2027/28
£m
2028/29
£m
2029/30
£m
2030/31
£m
(0.060) (0.295) 0.139 0.058 0.058 0.100 
5.3.4 The above adjustments, together with other small movements, have been
reflected in Appendices I and II. 
5.4 Economy, Development and Planning 
5.4.1 The Strategic Lead has reviewed the programme for Economy,
Development and Planning and proposed various budget adjustments, the
most significant of which are described below. 
5.4.2 Within Roads Infrastructure, works are continuing to progress at pace on the
Bertha Park Link Road and based on the current programme of works, it is
proposed £1.286 million is accelerated from 2026/27 to the current year. At
the Perth Eco Innovation Park, a mobilisation contract has commenced for the
initial works which includes surveys and works programming. However, based
on this, it is proposed £190,000 of the budget is moved from the current year
to 2026/27. 
5.4.3 The above proposed adjustments, together with other small movements, have
been reflected in Appendices I and II. 
Page 55 of 104

Page 56

5.5 Property Services 
5.5.1 The Strategic Lead has reviewed the programme for Property Services and
proposed various budget adjustments, the most significant of which are
described below. 
5.5.2 Within Project Support, the following budget adjustments are proposed 
2025/26
£m
2026/27
£m
2027/28
£m
Description
Methven Primary School
Refurbishment (1.000) 1.000 0.000
Construction works delayed
following contract tender
issues.
Perth Grammar School
Upgrades (0.819) 0.000 0.819
Ongoing programme of works,
with roof works now scheduled
for 2026/27.
Blairgowrie Recreation
Centre (1.700) 1.700 0.000
Phase 2 delayed until all
issues with the new facility
have been resolved. 
5.5.3 Within Property Service Management, £86,000 of initial works at Bells Sports
Centre were met form the Capital Improvement Programme in 2024/25,
before the Bells Sports Centre proposals were approved by the Council on 18
June 2025 (report 25/162 refers). It is therefore proposed that £86,000 of the
budget for Bells Sports Centre is transferred to Capital Improvement Projects
in 2025/26 to reflect that this element of work has already been undertaken. 
5.5.4 Within the Property Service Management Prudential Borrowing programme,
design work is continuing on several projects, including schools, within the
Decarbonisation Budget, however it is proposed to delay the works to
coincide with match funding becoming available in 2026/27. It is therefore
proposed to move £350,000 of the budget from 2025/26 to 2026/27. 
5.5.5 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I and II. 
5.6 Customer and Digital Services 
5.6.1 The Strategic Lead has reviewed the programme for Customer and Digital
Services and there is no proposed budget adjustments required at this time.
However, it is proposed to remove the Third-Party Contribution budget of
£5,000 as this was received in 2024/25. 
5.7 Unallocated Resources 
5.7.1 There are no movements to Unallocated Resources proposed in this report,
with a balance of £4.977 million in 2025/26 and £6.246 million in later years,
totalling £11.223 million over the 6-year programme. 
6. Housing Investment Programme 
6.1 The total current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2025/26 to 2029/30 remains
Page 56 of 104

Page 57

unchanged at £89.027 million. Movements across years from the previous
estimates are summarised in the table below and detailed in Appendix III. 
Approved 
1 October 2025
Current
Estimate
Movement 
£m £m £m
2025/26 41.478 42.138 0.660
2026/27       16.923       17.000 0.077
2027/28 13.633 13.776 0.143
2028/29 8.515 8.015 (0.500)
2029/30 8.478  8.098  (0.380)
Total 89.027 89.027 0.000 
Total Expenditure to 31 October 2025 (Housing Investment Programme) 
6.2 Net expenditure for 2025/26 to 31 October 2025 amounts to £19.190 million
with no receipts to date. Therefore, the borrowing requirement for the year to
date is also £19.190 million. 
6.3 The Strategic Leads for Housing and Communities and Property Services
have reviewed the Housing Investment Programme and proposed the budget
adjustments outlined below. 
6.4 It is proposed to draw down various amounts from the SHQS Future
Developments budgets over various years as follows: 
• Fire Precautions - £2.115 million for the new contract awarded for the
replacement of smoke detectors due to start in November 2025, with
£380,000 allocated in 2025/26, £1 million in 2026/27 and £735,000 in
2027/28.
• Major Adaptations - £146,000 in 2025/26 for works to convert the former
warden’s accommodation at James Court, Crieff Road into one-bedroom
flats.
• Lift Replacement Programme - £92,000 over 2025/26 and 2026/27 for the
lift replacement at Carpenter Court due to start in January 2026.
• Controlled Door Entry - £39,000 in 2025/26 to cover works at various
locations, with a further £7,000 of third-party recharges.
• Rannoch Road Regeneration – £15,000 in 2025/26 to cover the computer
network and infrastructure costs as well as other minor costs. 
• SHQS Future Developments – a total of £2.407 million is proposed to
cover the above movements, with £935,000 being allocated from 2026/27,
£592,000 from 2027/28, £500,000 from 2028/29 and £380,000 from
2029/30. 
6.5 Following representations and discussions with the Scottish Government, the
Council has submitted an application for an additional £1.050 million grant for
the Buy-Back programme. Accordingly, it is also proposed to increase the Buy
Back expenditure budget by this amount. To date, a total of 87 properties has
been purchased. 
6.6 There are no movements in Capital Receipts or Capital Financed from Current
Revenue (CFCR) across the 6-year programme. Consequently, the total
Page 57 of 104

Page 58

borrowing also remains unchanged. However, the proposed adjustments in
this report and the previous monitoring report on 1 October 2025 (report
25/249 refers) have resulted in just over 50% of the borrowing for the whole 6-
year programme now being required in the current year. 
6.7 All the proposed movements outlined above have been included in Appendix
III. 
7. Budget Overview 
7.1 The projected net expenditure outturn in 2025/26 for the Composite Capital
Budget is £134.945 million and represents 92% of the original 2025/26
budget approved on 30 April 2025 (£146.146 million). The revised budget is
based on the latest projections of expenditure and all budget adjustments
outlined within this report. 
7.2 Net expenditure to 31 October 2025 on the Composite Capital Budget is
£49.731 million and represents 37% of the proposed revised budget for
2025/26 of £134.945 million. 
7.3 The projected net expenditure outturn in 2025/26 for the Housing Investment
Programme is £42.138 million and represents 150% of the original 2025/26
budget approved on 30 April 2025 (£28.098 million). This increase reflects the
allocation of future years block budgets to specific projects in 2025/26 and the
increase in the Council House Buy-Back programme. 
7.4 Net expenditure to 31 October 2025 on the Housing Investment Programme is
£19.190 million which represents 46% of the proposed revised budget for
2025/26 of £42.138 million. 
7.5 The Council’s total Borrowing Requirement to 31 October 2025, based on the
Composite and Housing Investment Programmes, is £60.994 million. 
7.6 The estimated overall Council Borrowing Requirement for 2025/26 as a whole
has reduced by £2.838 million to £158.774 million as a result of the
monitoring adjustments reflected within this report. This reflects a reduction in
estimated borrowing in the current year on the Composite Programme of
£3.498 million and an increase on the Housing Investment Programme of
£0.660 million. 
7.7 In the context of the Capital Budget, the borrowing above refers specifically to
the funding of capital expenditure and therefore the need to borrow. The
actual amounts and timing of the borrowing is undertaken as part of the
Council’s Treasury Management operations and reported within the Treasury
Activity and Compliance reports throughout the year. 
8. Financial Risks 
8.1 In preparing the Council's capital monitoring, officers have considered the key
strategic, operational and financial risks facing the Council over this period.
Whilst the risks may be managed in the current financial year, given the
nature of capital projects these risks are also likely to impact future years
plans. 
Page 58 of 104

Page 59

8.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general
unallocated funds available to meet unforeseen expenditure. 
8.3 Given the latest monitoring position outlined in this report, the risks to 2025/26
have been removed or reduced. Going forward, risks to future years Capital
Expenditure plans will be monitored with mitigating actions identified. The
main risks impacting the Capital Budget are maintained in Appendix V. 
8.4 These risks are monitored continuously by officers, and any implications on
the Capital Budget will be reported to the Committee at the appropriate time. 
9. Impact and Value Assessment 
9.1 This is an operational report, and as such, an impact and value assessment in
not required. 
10. Appendices 
Appendix I - Composite Capital Programme - Estimated Capital Resources
2025/26 to 2030/31
Appendix II - Composite Capital Programme - Summary of Capital Resources
and Expenditure 2025/26 to 2030/31        
Appendix III - HRA Capital Investment Programme - Summary of Capital
Resources and Expenditure 2025/26 to 2029/30 
Appendix IV - Significant Capital Projects Progress Update
Appendix V - Capital Budget Financial Risks 
Page 59 of 104

Page 60

Page 60 of 104

Page 61

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2025/26 to 2030/31
APPENDIX I
Capital Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources Resources
2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
Capital Grants
Road Safety Initiaive Fund 1 0 0 0 0 0 1
General Capital Grant 11,374 21,752 12,750 12,750 12,750 12,750 84,126
Total Capital Grants 11,375 21,752 12,750 12,750 12,750 12,750 84,127
General Capital Receipts
General Fund - Capital Receipts 570 0 0 0 0 0 570
General Fund - Ring Fenced Receipts 778 844 994 981 1,019 1,000 5,616
Total General Capital Receipts 1,348 844 994 981 1,019 1,000 6,186
Commercial Property Receipts
Capital Receipts brought-forward 1,332 2,614 2,449 3,947 4,577 5,022 1,332
Commercial Property Capital Receipts 619 235 2,398 2,530 645 800 7,227
Capital Receipts carried-forward (2,614) (2,449) (3,947) (4,577) (5,022) (1,922) (1,922)
Total Commercial Property Receipts Applied (663) 400 900 1,900 200 3,900 6,637
Contributions
Tay Cities Deal 550 505 3,945 500 956 0 6,456
Developer Contributions 5,344 2,600 2,600 2,500 2,500 2,000 17,544
Other Third Party Contributions 613 2,000 3,000 1,000 1,000 2,064 9,677
Revenue Budget Contributions 175 124 124 0 0 0 423
Total Contributions 6,682 5,229 9,669 4,000 4,456 4,064 34,100
Capital Borrowing Requirement 118,320 84,517 63,899 51,526 51,820 58,915 428,997
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 137,062 112,742 88,212 71,157 70,245 80,629 560,047
Movements in Resources from Approved Budget - 1 October 2025
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Increase/(Decrease) in:
Capital Receipts - General Fund 0 0 0 0 0 0 0
Capital Receipts - Commercial Property 0 0 0 0 0 0 0
Capital Receipts - Ring Fenced 1 0 0 0 0 0 1
Capital Grants:
Road Safety Initiaive Fund 0 0 0 0 0 0 0
General Capital Grant 0 0 0 0 0 0 0
Tay Cities Deal 0 0 0 0 0 0 0
Third Party Contributions 458 0 0 0 0 0 458
Revenue Contributions 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0
Resources b/f 0 0 0 0 0 0 0
Resources c/f to future years 0 0 0 0 0 0 0
Borrowing Requirement (3,498) (516) 1,948 1,908 58 100 0
Total Increase/(Decrease) in Resources (3,039) (516) 1,948 1,908 58 100 459
Approved Resources 1 October 2025 140,101 113,258 86,264 69,249 70,187 80,529 559,588
Revised Resources 137,062 112,742 88,212 71,157 70,245 80,629 560,047
7
Page 61 of 104

Page 62

Page 62 of 104

Page 63

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2025/26 to 2030/31
APPENDIX II
Approved Proposed Revised Actuals Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Report 1 Adjustment 31-Oct-25
Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE 50,464 (460) 50,004 20,526 50,004 36,035 23,738 20,210 16,859 17,778 164,624
HOUSING & COMMUNITIES 6,122 (221) 5,901 1,502 5,901 1,620 2,129 1,558 1,558 1,050 13,816
ECONOMY, DEVELOPMENT & PLANNING 30,383 1,052 31,435 7,941 31,435 31,503 (3,520) (250) (2,436) 1,186 57,918
PROPERTY SERVICES 40,521 (3,869) 36,652 17,998 36,652 32,616 45,654 39,411 44,050 40,997 239,380
CUSTOMER & DIGITAL SERVICES 5,023 0 5,023 1,096 5,023 6,150 10,892 6,312 5,949 8,862 43,188
HEALTH & SOCIAL CARE 953 0 953 668 953 1,345 1,256 1,435 1,290 1,446 7,725
UNALLOCATED CAPITAL RESOURCES 4,977 0 4,977 0 4,977 0 0 0 0 6,246 11,223
TOTAL NET EXPENDITURE 138,443 (3,498) 134,945 49,731 134,945 109,269 80,149 68,676 67,270 77,565 537,874
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (11,374) 0 (11,374) (7,724) (11,374) (21,752) (12,750) (12,750) (12,750) (12,750) (84,126)
DEVELOPER CONTRIBUTIONS (5,344) 0 (5,344) 0 (5,344) (2,600) (2,600) (2,500) (2,500) (2,000) (17,544)
CAPITAL RECEIPTS (1,189) 0 (1,189) (253) (1,189) (235) (2,398) (2,530) (645) (800) (7,797)
ANNUAL BORROWING REQUIREMENT 120,536 (3,498) 117,038 41,754 117,038 84,682 62,401 50,896 51,375 62,015 428,407
CAPITAL RECEIPTS BROUGHT FORWARD (1,332) 0 (1,332) (1,332) (1,332) (2,614) (2,449) (3,947) (4,577) (5,022) (1,332)
CAPITAL RECEIPTS CARRIED FORWARD 2,614 0 2,614 1,382 2,614 2,449 3,947 4,577 5,022 1,922 1,922
TOTAL NET BORROWING REQUIREMENT 121,818 (3,498) 118,320 41,804 118,320 84,517 63,899 51,526 51,820 58,915 428,997
7
Page 63 of 104

Page 64

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2025/26 to 2030/31
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 31-Oct-25
Report 1 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE
Traffic & Road Network
Road Safety Initiatives (20mph Zones etc..) 389 389 152 389 362 361 400 400 450 2,362
Scottish Government Grant (1) (1) (1) 0 0 0 0 0 (1)
Road Safety Initiatives - A94 Safety Improvements 84 84 84 0 0 0 0 0 84
Active Travel Grant -Traffic & Road Safety Schemes 983 983 278 983 600 600 600 600 600 3,983
20mph Signage Programme 0 0 0 120 0 0 0 0 120
Additional Road Safety - Pedestrian Crossings 246 246 65 246 153 0 0 0 0 399
Traffic Signal Renewals - Upgrading 200 200 15 200 0 100 100 100 95 595
Investment in Local Footpaths 20 20 20 100 0 0 0 0 120
Car Parking Investment - Pitlochry 7 7 7 7 0 0 0 0 0 7
Revenue Contribution (1) (1) (1) 0 0 0 0 0 (1)
A977 Upgrades 177 (177) 0 0 177 0 0 0 0 177
Broich Road, Crieff - Road Realignment & Safety Measures 18 18 18 0 0 0 0 0 18
Sub-Total 2,122 (177) 1,945 517 1,945 1,512 1,061 1,100 1,100 1,145 7,863
Street Lighting Partnership
Street Lighting 0 0 0 0 0 600 600 600 1,800
Sub-Total 0 0 0 0 0 0 0 600 600 600 1,800
Roads Maintenance Partnership
Structural Maintenance 10,702 283 10,985 6,088 10,985 8,963 8,964 8,320 8,320 9,500 55,052
Third Party Contribution (249) (283) (532) (532) 0 0 0 0 0 (532)
Footways 357 2 359 271 359 368 368 341 341 400 2,177
Third Party Contribution 0 (2) (2) (2) (2) 0 0 0 0 0 (2)
Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 204 204 9 204 0 0 0 0 0 204
Sub-Total 11,014 0 11,014 6,366 11,014 9,331 9,332 8,661 8,661 9,900 56,899
Structures
Bridge Refurbishment Programme 1,787 1,787 575 1,787 1,855 1,836 2,259 2,259 2,603 12,599
Old Perth Bridge - Strengthening 273 (235) 38 14 38 235 2,216 0 0 0 2,489
Perth Queens Bridge - Strengthening 81 81 4 81 179 192 1,850 0 0 2,302
Culteuchar Culvert 0 0 (9) 0 0 0 0 0 0 0
Garry Viaduct 393 393 23 393 310 1,245 1,720 669 0 4,337
Bolfrack River Retaining Wall 534 534 269 534 0 0 0 0 0 534
Bridge of Tilt 1,250 1,250 30 1,250 0 0 0 0 0 1,250
Corb Bridge Culvert, Kinross 450 450 387 450 0 0 0 0 0 450
Blairgowrie Bridge 200 200 1 200 175 1,000 0 0 0 1,375
Vehicular Bridge Parapets Programme - Assess & Upgrade 10 10 10 24 0 0 0 0 34
Sub-Total 4,978 (235) 4,743 1,294 4,743 2,778 6,489 5,829 2,928 2,603 25,370
Flooding
Comrie Flood Protection Scheme 22,993 22,993 8,234 22,993 7,830 0 0 0 0 30,823
Milnathort Flood Protection Scheme 331 331 1 331 0 0 0 0 0 331
South Kinross Flood Protection Scheme 701 701 289 701 10,296 3,099 75 0 0 14,171
Flood Mitigation Measures - Dunkeld and Craigie Burn 264 264 109 264 88 153 340 145 0 990
Investment in Surface Water Management Schemes - Leaky Dam, Rattray Burn3 3 3 48 44 255 0 0 350
Coastal Change Adaptation 59 59 59 0 0 0 0 0 59
Almondbank Flood Protection Scheme 0 0 109 0 0 0 0 0 0 0
Sub-Total 24,351 0 24,351 8,742 24,351 18,262 3,296 670 145 0 46,724
Climate Change and Zero Waste
Climate Change Programme 215 215 215 530 200 0 0 0 945
Climate Change Unallocated 329 329 329 0 0 0 0 0 329
Nature Restoration 199 199 199 0 0 0 0 0 199
Sub-Total 743 0 743 0 743 530 200 0 0 0 1,473
Prudential Borrowing Projects
Climate Change and Zero Waste
Wheeled Bin Replacement Programme - Domestic Bins 276 1 277 128 277 200 200 220 220 225 1,342
Wheeled Bin Replacement Programme - Commercial Bins 71 71 48 71 20 20 25 25 25 186
Capital Receipts - Disposals 0 (1) (1) (1) (1) 0 0 0 0 0 (1)
Recycling in Schools - Waste Bin Purchases 102 (48) 54 5 54 48 0 0 0 0 102
Recycling Containers, Oil Banks & Battery Banks Replacement Programme154 154 4 154 105 105 70 70 75 579
Page 64 of 104

Page 65

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2025/26 to 2030/31
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 31-Oct-25
Report 1 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Capital Receipts - Disposals (4) (4) (1) (4) 0 0 0 0 0 (4)
Litter Bins 65 65 2 65 50 50 55 55 55 330
Direct Services
Vehicle Replacement Programme 6,400 6,400 3,019 6,400 2,942 2,692 3,311 3,394 3,500 22,239
Capital Receipts - Vehicle Disposals (773) (773) (135) (773) (294) (269) (331) (339) (350) (2,356)
Street Lighting Partnership
Street Lighting Renewal - LED & Column Replacement 965 965 538 965 551 562 0 0 0 2,078
Sub Total 7,256 (48) 7,208 3,607 7,208 3,622 3,360 3,350 3,425 3,530 24,495
TOTAL - ENVIRONMENT & INFRASTRUCTURE 50,464 (460) 50,004 20,526 50,004 36,035 23,738 20,210 16,859 17,778 164,624
HOUSING & COMMUNITIES
Community Greenspace
Community Greenspace Sites 0 0 0 75 894 700 700 250 2,619
Play Areas and Parks 1,233 (194) 1,039 148 1,039 1,395 582 500 500 500 4,516
Third Party Contribution (19) (19) (19) 0 0 0 0 0 (19)
Revenue Contribution (50) (50) (50) 0 0 0 0 0 (50)
3G Pitch, Blairgowrie 34 34 34 0 0 0 0 0 34
Countryside Sites 0 0 0 0 139 0 0 0 139
Community Greenspace Bridges 73 33 106 79 106 0 0 0 0 0 106
Core Path Implementation 19 19 19 0 0 0 0 0 19
Third Party Contribution (19) (19) (19) 0 0 0 0 0 (19)
Kinnoull Hill 8 8 8 0 0 0 0 0 8
Cemetery Extensions 60 (60) 0 0 150 514 358 358 300 1,680
Sub-Total 1,339 (221) 1,118 227 1,118 1,620 2,129 1,558 1,558 1,050 9,033
Improvements
New Gypsy Traveller Site 1,942 1,942 1 1,942 0 0 0 0 0 1,942
Sub Total 1,942 0 1,942 1 1,942 0 0 0 0 0 1,942
Parking, Public Transport Unit and Civil Contingencies
Community Transport Iniatives 27 27 19 27 0 0 0 0 0 27
Bus Infrastructure Fund Expenditure 374 374 26 374 0 0 0 0 0 374
Sub-Total 401 0 401 45 401 0 0 0 0 0 401
Community Learning and Development and Equalities
Community-Led Asset Transfers 75 75 5 75 0 0 0 0 0 75
Sub-Total 75 0 75 5 75 0 0 0 0 0 75
Prudential Borrowing Projects
Parking, Public Transport Unit and Civil Contingencies
Community Transport Vehicles 115 115 115 115 0 0 0 0 0 115
Kinnoull Street Car Park - Purchase & Upgrade 2,250 2,250 1,109 2,250 0 0 0 0 0 2,250
Sub Total 2,365 0 2,365 1,224 2,365 0 0 0 0 0 2,365
TOTAL - HOUSING & COMMUNITIES 6,122 (221) 5,901 1,502 5,901 1,620 2,129 1,558 1,558 1,050 13,816
ECONOMY, DEVELOPMENT & PLANNING
Roads Infrastructure
A9/A85 Road Junction Improvements (PTF Phase 1) 14 14 84 14 0 0 0 0 0 14
Destiny Bridge and New Kingsway (PTF Phase 2) 5,617 168 5,785 1,934 5,785 314 0 0 0 0 6,099
Third Party Contribution 168 (168) 0 0 0 0 0 0 0 0
Bertha Park Link Road (PTF Phase 3) 9,312 1,286 10,598 5,614 10,598 4,462 0 0 0 0 15,060
Third Party Contribution 0 0 0 0 0 0 0 (1,064) (1,064)
Perth Eco-Innovation Park at Perth West 9,845 (190) 9,655 79 9,655 22,490 0 0 0 0 32,145
Third Party Contributions - Tay Cities Deal (550) (550) (550) (505) (3,945) (500) (956) 0 (6,456)
Other Third Party Contributions 0 0 0 (2,000) (3,000) (1,000) (1,000) (1,000) (8,000)
Capital Receipts - Ring Fenced Land Disposals 0 0 0 (550) (725) (650) (680) (650) (3,255)
Sub-Total 24,406 1,096 25,502 7,711 25,502 0 24,211 (7,670) (2,150) (2,636) (2,714) 34,543
Tourism, Culture and Place
Perth City Improvements (PTF Phase 4) 0 0 0 3,642 0 0 0 0 3,642
Perth City Centre Golden Route (Rail Station) 44 (44) 0 0 0 0 0 0 0 0
City Greening 31 31 31 0 0 0 0 0 31
Page 65 of 104

Page 66

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2025/26 to 2030/31
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 31-Oct-25
Report 1 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Perth & Kinross Lighting Action Plan 1,175 1,175 8 1,175 0 0 0 0 0 1,175
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 0 0 46 0 0 0 0 0 0 0
Adapt Your Property - Vacant Town & City Centre Space 390 390 390 300 300 0 0 0 990
Sub-Total 1,640 (44) 1,596 54 1,596 3,942 300 0 0 0 5,838
Commercial Property Investment Programme
Tourism, Culture and Place
Broxden Drainage Mitigation Works 17 17 21 17 0 0 0 0 0 17
Mercian Buildings, Shore Road, Perth 451 451 12 451 0 0 0 0 0 451
Crioch Business Centre, Crieff 316 316 17 316 0 0 0 0 0 316
Northfield Business Park 2,027 2,027 77 2,027 0 0 0 0 0 2,027
Northfield Business Park (Phase 2) 0 0 0 0 0 800 0 0 800
Northfield Business Park - Site 6 0 0 0 0 1,500 0 0 0 1,500
Plot 4 Kinross West 1,526 1,526 49 1,526 0 0 0 0 0 1,526
Welton Road SBU's, Blairgowrie 0 0 0 200 1,400 0 0 0 1,600
Burnside Street SBU's, Pitlochry 0 0 0 600 0 0 0 0 600
Depot SBU's, Blackford 0 0 0 0 0 0 200 1,400 1,600
SBU's, Inveralmond Road, Perth 0 0 0 900 0 0 0 0 900
Land at South Turfhills Depot, Kinross 0 0 0 0 0 1,100 0 0 1,100
Aldour Business Centre, Pitlochry 0 0 0 0 0 0 0 900 900
Borlich Business Centre, Aberfeldy 0 0 0 0 0 0 0 1,600 1,600
Aberfeldy SBU's 0 0 0 700 0 0 0 0 700
4,337 0 4,337 176 4,337 2,400 2,900 1,900 200 3,900 15,637
Prudential Borrowing Projects
Tourism, Culture and Place
Land Purchase & Development (Hotel Development) 0 0 0 950 950 0 0 0 1,900
Sub Total 0 0 0 0 0 950 950 0 0 0 1,900
TOTAL - ECONOMY, DEVLOPMENT & PLANNING 30,383 1,052 31,435 7,941 31,435 31,503 (3,520) (250) (2,436) 1,186 57,918
PROPERTY SERVICES
Project Support
Investment in the Learning Estate 1,900 1,900 762 1,900 2,506 6,823 0 0 0 11,229
Braco Primary School Upgrade 150 150 17 150 350 3,000 5,000 0 0 8,500
School Toilet Upgrade Programme 400 400 263 400 0 0 0 0 0 400
Methven Primary School Refurbishment 2,700 (1,000) 1,700 484 1,700 1,970 0 0 0 0 3,670
North/West Perth - New Primary School 341 341 341 7,672 15,400 0 0 0 23,413
Perth Academy - Refurbishment 1,476 1,476 992 1,476 194 0 0 0 0 1,670
Perth Grammar School - Upgrade Programme Phase 3 1,419 (819) 600 385 600 1,628 819 0 0 0 3,047
Perth High School - New School Investment 13,018 13,018 8,839 13,018 3,600 0 0 0 0 16,618
Pitlochry High School Extension (Pitlochry Leisure Review) 200 200 22 200 750 5,000 2,750 0 0 8,700
Harris Academy/Invergowrie 26 26 26 0 0 0 0 0 26
Blairgowrie Recreation Centre - Replacement 2,532 (1,700) 832 496 832 1,700 0 0 0 0 2,532
Technology Upgrades 250 250 4 250 483 519 0 0 0 1,252
Community School of Auchterarder (FSM) 0 0 0 250 750 2,511 0 0 3,511
Community Campus Access Adaptations 25 25 16 25 0 0 0 0 0 25
Sub-Total 24,437 (3,519) 20,918 12,280 20,918 21,103 32,311 10,261 0 0 84,593
Property Service Management
DDA Adaptation & Alteration Works Programme 353 353 102 353 200 200 0 0 0 753
Property Compliance Works Programme 609 609 249 609 650 400 0 0 0 1,659
Capital Improvement Projects Programme 1,780 86 1,866 637 1,866 1,800 894 10,000 9,600 11,000 35,160
Pitlochry High School - Upgrade Programme 20 20 7 20 0 0 0 0 0 20
Friarton Depot - Waste Transfer Station 2,300 2,300 51 2,300 221 0 0 0 0 2,521
Letham Community Wellbeing Hub 338 338 323 338 0 0 0 0 0 338
PH2O 300 300 31 300 1,700 2,000 10,000 30,000 29,847 73,847
Bells Sport Centre 500 (86) 414 59 414 1,500 1,500 3,500 3,000 0 9,914
Kinross Community Campus Sports Facilities 0 0 0 900 5,000 1,000 0 0 6,900
Crieff Community Campus Sports Facilities 0 0 0 0 1,000 4,000 1,300 0 6,300
Crieff Drummond Arms - Regeneration 1,500 1,500 420 1,500 1,442 0 0 0 0 2,942
Perth Concert Hall 395 395 19 395 1,000 1,000 500 0 0 2,895
Perth Museum 113 113 15 113 0 0 0 0 0 113
Sub-Total 8,208 0 8,208 1,913 8,208 9,413 11,994 29,000 43,900 40,847 143,362
Page 66 of 104

Page 67

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2025/26 to 2030/31
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 31-Oct-25
Report 1 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Prudential Borrowing Projects
Decarbonisation 528 (350) 178 14 178 350 0 0 0 0 528
Energy Conservation & Carbon Reduction Programme 189 189 74 189 150 150 150 150 150 939
Third Party Contribution (41) (41) (41) 0 0 0 0 0 (41)
Pullar House - Purchase & Re-Purposing 7,200 7,200 3,717 7,200 1,600 1,199 0 0 0 9,999
Sub-Total 7,876 (350) 7,526 3,805 7,526 2,100 1,349 150 150 150 11,425
TOTAL - PROPERTY SERVICES 40,521 (3,869) 36,652 17,998 36,652 32,616 45,654 39,411 44,050 40,997 239,380
CUSTOMER & DIGITAL SERVICES
ICT Infrastructure Replacement and Upgrade Programme 2,661 2,661 919 2,661 4,118 8,605 4,110 3,547 7,001 30,042
Data & Analytics 728 5 733 44 733 845 849 854 890 621 4,792
Third Party Contribution 5 (5) 0 0 0 0 0 0 0 0
Supporting Digital 937 937 937 1,037 989 1,122 1,153 736 5,974
Software Licences (Revenues & Benefits) 50 50 50 51 49 0 0 0 150
School Audio-Visual (AV) Equipment Replacement Programme 27 27 18 27 26 27 226 359 504 1,169
Mosaic - Swift Social Work System Replacement 659 659 115 659 197 497 0 0 0 1,353
Revenue Contribution (124) (124) (124) (124) (124) 0 0 0 (372)
Case Management System 80 80 80 0 0 0 0 0 80
TOTAL - CUSTOMER & DIGITAL SERVICES 5,023 0 5,023 1,096 5,023 6,150 10,892 6,312 5,949 8,862 43,188
HEALTH & SOCIAL CARE
Occupational Therapy Equipment 250 250 250 250 250 150 250 100 256 1,256
Technology Enabled Telecare 650 650 418 650 1,042 1,037 1,115 1,120 1,120 6,084
Software Licences 53 53 53 53 69 70 70 70 385
TOTAL - HEALTH & SOCIAL CARE 953 0 953 668 953 1,345 1,256 1,435 1,290 1,446 7,725
Unallocated Capital Resources 4,977 4,977 4,977 0 0 0 0 6,246 11,223
TOTAL COMPOSITE NET EXPENDITURE 138,443 (3,498) 134,945 49,731 134,945 109,269 80,149 68,676 67,270 77,565 537,874
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
CAPITAL INCOME & RECEIPTS
General Capital Grant - Scottish Government (11,374) (11,374) (7,724) (11,374) (21,752) (12,750) (12,750) (12,750) (12,750) (84,126)
Developer Contributions (5,344) (5,344) (5,344) (2,600) (2,600) (2,500) (2,500) (2,000) (17,544)
General Fund - Capital Receipts/Disposal (570) 0 (570) (27) (570) 0 0 0 0 0 (570)
Commercial Property - Capital Receipts/Disposal (619) 0 (619) (226) (619) (235) (2,398) (2,530) (645) (800) (7,227)
Total: Capital Receipts (17,907) 0 (17,907) (7,977) (17,907) (24,587) (17,748) (17,780) (15,895) (15,550) (109,467)
Annual Composite Borrowing Requirement 120,536 (3,498) 117,038 41,754 117,038 84,682 62,401 50,896 51,375 62,015 428,407
CAPITAL RECEIPTS BROUGHT FORWARD (1,332) 0 (1,332) (1,332) (1,332) (2,614) (2,449) (3,947) (4,577) (5,022) (1,332)
CAPITAL RECEIPTS CARRIED FORWARD 2,614 0 2,614 1,382 2,614 2,449 3,947 4,577 5,022 1,922 1,922
TOTAL NET COMPOSITE BORROWING REQUIREMENT 121,818 (3,498) 118,320 41,804 118,320 84,517 63,899 51,526 51,820 58,915 428,997
Page 67 of 104

Page 68

Appendix II
Project Project Description
Traffic & Road Network
Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety
Road Safety Initiatives - A94 Safety Improvements A programme of works to improve road safety on the A94
Active Travel Grant - Traffic & Road Safety Schemes A programme of works to improve active travel
20mph Signage Programme A programme of works to introduce 20mph speed limits.
Schools Road Safety Measures A programme of works to improve road safety in the vicinity of schools
Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities
Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal infrastructure
Investment in Local Footpaths A programme of works to improve and provide local footpaths
Car Parking Investment - Pitlochry Purchase of land and construction of a public car park
A977 Upgrades A programme of works to improve road safety along the A977.
Broich Road, Crieff - Road Realignment & Safety
Measures Realignment of Broich Road, Burrell Street and Gallowhill Junction
Street Lighting Partnership
Street Lighting Replacement of existing street lighting lanterns, columns and cable network.
Roads Maintenance Partnership
Structural Maintenance
Road maintenance to extend the life of roads, including predominately road
resurfacing, surface dressings, installing new drainage infrastructure and repairs
to and replacement of defective embankments and retaining walls
Footways Replacement of existing  deteriorated footway surfaces
Perth Flood Protection Scheme (South Inch Culvert
Reinstatement)
Ground investigation and monitoring then design project to refurbish existing
culvert
Road Safety Barriers Renewal of existing barriers where unrecoverable damage has occurred and
renewal of barriers where timber posts have been used in construction
Bridges
Bridge Refurbishment Programme Used to appoint specialist external inspection teams and consultants to carry out
specialist access bridge inspections and assessments
Old Perth Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including
a range of assessment, investigation, strengthening and improvement works
Perth Queens Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including
a range of assessment, investigation, strengthening and improvement works
Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert
Garry Viaduct
Replacement of Bearings and Parapets; including strengthening of deck for
bearing replacement jacking up, and to cater for increased parapet vehicular
deterrent capacity
Bolfrack River Retaining Wall Replacement of failed section of retaining wall supporting A827 adjacent to
River Tay
Bridge of Tilt Repairs to masonry bridge and installation of major scour mitigation measures
Corb Bridge Culvert, Kinross Installation of structural lining to dilapidated culvert
Blairgowrie Bridge Major scour mitigation scheme
Vehicular Bridge Parapets Programme - Assess &
Upgrade Assessment and Upgrading of Vehicle Parapets Programme
Flooding
Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Comrie
Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Milnathort
South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in South
Kinross
Flood Mitigation Measures - Dunkeld and Craigie Burn Design and construction of schemes to reduce the risk of flooding in Dunkeld
and Craigie Burn
Investment in Surface Water Management Schemes -
Leaky Dam, Rattray Burn
Design and construction of a natural flood management measure (Leaky Dam)
to reduce the risk of flooding in Rattray
Coastal Change Adaptation Design and construct projects to deal with incidents of coastal erosion
Climate Change and Zero Waste
Climate Change Programme
A programme of projects to meet the priorities to deliver the Top and High
Priority Projects in the Council's Climate Change Strategy and Action Plan.
Proposed projects will be scrutinised by the Council's Climate Change and
Sustainabliltiy Group
Nature Restoration
Protection and restoration of biodiversity focusing on over-exploitation of the
natural environment and addressing its consequences; habitat loss and
fragmentation; and invasive non-native species.
Prudential Borrowing Projects
ENVIRONMENT & INFRASTRUCTURE
Page 68 of 104

Page 69

Appendix II
Project Project Description
Wheeled Bin Replacement Programme - Domestic Bins Replacement of damaged and end of life wheeled bins for households. Also
suppling bins for new properties
Wheeled Bin Replacement Programme - Commercial
Bins
Replacement of damaged and end of life wheeled bins for commercial
customers. Also suppling bins for new customers and changes to collection
contracts
Recycling in Schools - Waste Bin Purchases This project will improve the recycling infrastrucuture in PKC learning
establishments and will improve positive behaviours with staff and pupils.
Recycling Containers, Oil Banks & Battery Banks
Replacement Programme
Replacement of damaged and end of life oil and battery banks
Litter Bins Replacement of damaged and end of life litter bins and/or for general supply of
litter bins where required.
Vehicle Replacement Programme Fleet vehicle replacement programme
Street Lighting Renewal - LED & Column Replacement Street Lighting LED conversion and column replacement programme
Community Greenspace
Community Greenspace Sites Main fund for all Community Greenspace Sites which is drawn down to support
the overall capital programme of refurbishments and upgrades
Play Areas and Parks
Refurbishment of 'Settlement and Neighbourhood' classification parks working in
partnership with communities to improve, update and renew worn out or
obsolete infrastructure.  Small budget to facilitate refurbishment of former
Premier Park upgrades
3G Pitch, Blairgowrie Two phase community led project to provide a new full sized 3G football pitch
and pavilion
Countryside Sites Refurbishment of more natural parks and open spaces
Community Greenspace Bridges Refurbishment programme for all bridges on Community Greenspace sites
Core Path Implementation Holding budget for Crieff Comrie Core path development mainly funded through
Sustrans
Kinnoull Hill Complete
Cemetery Extensions Funding to allow the extension of existing or development of new cemeteries to
address the pressure for burial space
Improvements
New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site
Parking, Public Transport Unit and Civil Contingencies
Community Transport Iniatives Purchase of vehicles and charging infrastructure for community
transport/resilience groups to use to deliver on unmet need in the local area.
Bus Infrastructure Fund Improving the infrastructure needed to operate buses
Community Learning and Development and Equalities
Community-Led Asset Transfers Financial assistance for community groups wishing to take on PKC assets using
the community asset transfer process
Prudential Borrowing Projects
Community Transport Vehicles Providing vehicles to community transport groups
Kinnoull Street Car Park - Purchase
Purchase of Kinnoull Street Multi-Storey Car Park to increase Perth and Kinross
Council car parking capacity to support delivery of the Perth City Integrated
Investment Proposal
Roads Infrastructure
A9/A85 Road Junction Improvements (PTF Phase 1)
New infrastructure including a new A9 overbridge, a bridge over the River
Almond and road linking the A85 to Inveralmond and Bertha Park (Phase 1 of
Perth Transport Futures Project)
Destiny Bridge and New Kingsway (PTF Phase 2)
New road and major structure over the River Tay, linking the A9 north of
Inveralmond and the A94 north of Scone (Phase 2 of Perth Transport Futures
Project)
Bertha Park Link Road (PTF Phase 3) Phase 3 of Perth Transport Futures Project which is a new link road (1.4km)
running through Bertha Park, connecting Phases 1 and 2.
Perth Eco-Innovation Park at Perth West
Provision of enabling infrastructure (access road, A9 underpass and unit
platforms) to develop 25ha of employment land supporting clean growth,
business innovation and jobs - Phase 1 (11ha).
Tourism, Culture and Place
Perth City Improvements (PTF Phase 4)
Design and development of sustainable transport corridors to improve access to
and from Perth and enable additional development and improvement within
Perth city centre
HOUSING & COMMUNITIES
ECONOMY, DEVELOPMENT & PLANNING
Page 69 of 104

Page 70

Appendix II
Project Project Description
Perth City Centre Golden Route (Rail Station)
Design and development of improvements to access, signage and animation
from rail and bus station to Perth city centre to complement improvements to
integration of transport
City Greening
Improvements to support enhancement of retail trading environment and
residential areas and enhanced use of space for markets, events and alfresco
use
Perth & Kinross Lighting Action Plan
Architectural and creative lighting to enhance city and towns appearance,
reduce energy cost and increase safety at nighttime to increase dwell time,
support the hospitality sector, events and grow the evening economy
Low Carbon Transport & Active Travel Hub - Broxden EV
Chargers
Provision of fast EV chargers combined with solar power generation and battery
storage at Broxden Park & Ride - Near completion
Adapt Your Property - Vacant Town & City Centre Space
Adapt Your Property supports capital adaptation works to empty and underused
commercial property in city & town centres, looking at adaptation to attract new
commercial, community or residential use.
Other Planning Projects
Local Full Fibre Network Provision of gigabit fibre connectivity to Council's buildings to unlock gigabit
connectivity for surrounding communities. Complete
Commercial Property Investment Programme Capital investment in economic development in serviced units and land
Prudential Borrowing Project
Land Purchase & Development (Hotel Development)
This scheme involves the redevelopment of 1-5 High Street as serviced
apartments courtesy of a heritage grant funding award that includes disposal to
a developer subject to conclusion of a development agreement
Project Support
Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our existing school
estate
Braco Primary School Upgrade Replacement school on adjacent land
School Toilet Upgrade Programme Major toilet upgrades in various schools
Methven Primary School Refurbishment
Upgrade of Methven Primary School facilities including new dining and gym hall
North/West Perth - New Primary School New primary school located at Bertha Park
Riverside Primary New School Replacement of North Muirton and Balhousie primary schools
Perth Academy - Refurbishment Investment to upgrade the infrastructure and environment of the Perth Academy
including structural work to sports block, lighting upgrades, classroom upgrades
and science block cladding
Perth Grammar School - Upgrade Programme Phase 3 Investment to upgrade the infrastructure and environment of the Perth Grammar
School including structural work to assembly hall, AV and WiFi upgrades,
classroom refurbishment and door upgrades
Perth High School - New School Investment Replacement of the existing Perth High School
Pitlochry High School Extension (Pitlochry Leisure
Review)
Creation of community campus including sports facilities including 4 court sports
hall and associated works
Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy in Dundee
for continuation of access for pupils based in Invergowrie
Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie
Technology Upgrades Upgrade to practical teaching environment within the existing school estate
Community School of Auchterarder (FSM) Upgrading kitchen and dining facilities to provide the enhanced Free School
Meals programme
Community Campus Access Adaptations To support adaptations in schools and community campuses to help facilitate
increased community access
Property Service Management
DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council Buildings - e.g.
Ramps/Lifts/Door Access/Accessible Toilets and Changing Areas
Property Compliance Works Programme
To ensure compliance with current and changing legislation including - New Fire
Alarms; Lighting; Wiring; Fire Protection Works; Gas pipework within buildings
and Roof Restraint safety systems
Capital Improvement Projects Programme
Roof Upgrades; Full internal refurbishment works; New Heating Systems;
Boilers and pipework; Structural Upgrades; Small extensions; New
Windows/Doors; New Fencing; New Cladding
Pitlochry High School - Upgrade Programme
Upgrades to Mechanical and Electrical Infrastructure, including rewiring, heating
and controls systems, replacement lighting and consequential building works
such as new ceilings, painting and flooring
Friarton Depot - Waste Transfer Station
This project aims to refurbish the main waste transfer station building to provide
a safe environment for workers. The project will involve a complete re-cladding
of the existing structure, new doors and new services installation. Some initial
enabling work are being carried out currently.
PROPERTY SERVICES
Page 70 of 104

Page 71

Appendix II
Project Project Description
Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to reduce energy cost across
the property estate
Letham Community Wellbeing Hub Complete
PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink.
Bells Sport Centre Development of Bells' as an unheated, covered sports pitch and events space
Kinross Community Campus Sports Facilities Improvements to the building fabric and energy efficiency of Live Active Loch
Leven
Crieff Community Campus Sports Facilities Improvements to the building fabric and energy efficiency of Strathearn
Community Campus Leisure Facilities
Crieff Drummond Arms - Regeneration Demolition of former hotel, regeneration of site for housing use
Perth Museum Redevelopment of former Perth City Hall to New Perth Museum
Prudential Borrowing Projects
Decarbonisation This budget will support PKCs path to NetZero and focus primarily on the de-
carbonisation of heat and replacing inefficient direct emissions heat sources
Energy Conservation & Carbon Reduction Programme This budget is focused on works to reduce PKC energy consumption and help
achieve annual KPI energy reduction of 3%
Pullar House - Purchase & Re-Purposing Purchase and development of Pullar House to create a shared Public Sector
Hub
Customer & Digital Services
ICT Infrastructure & Replacement and Upgrade
Programme
This Programme delivers the IT / digital environment, digital resources and
systems required by staff and young people. The programme maintains,
supports and develops computers; networks; telephony; Microsoft systems;
connectivity and equipment; datacentres; servers; file storage and back up;
security systems and video conferencing
Data & Analytics
Delivers the governance, tools, technologies and organisation-wide skills
required for optimising value from Council data, driving informed decision
making around resources, priorities and service delivery targets
Supporting Digital
Develops the capabilities we need to be an innovative digital organisation. 
Including developing the Council’s corporate employee (mobile working) and
customer (online services) platforms, to create new digital products and
services; investment in tools such as Microsoft; resourcing innovation and
building digital skills, insight and expertise
Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team
School Audio-Visual (AV) Equipment Replacement
Programme Ensures all Perth and Kinross classrooms have equitable access to audio visual
panels and the digital skills to exploit these resources for learning and teaching
Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system to replace SWIFT
Hardware Funding of additional or bespoke IT Hardware for Communities Staff
Licenses Funding of software contracts
Case Management System New system for management of client cases
Occupational Therapy Equipment
Supply and install of occupational therapy equipment following referral from
heakth and social care professionals.
Technology Enabled Telecare
Replacement of existing analogue Community Alarm devices to digital alarm
units prior to UK switch-off of analogue network, as well as ongoing rolling
replacement programme.
Moving & Handling Office Refurbishment Relocate staff base, currently under review
Software Licences Various licences for essential social care systems
Developing Supported Tenancies Contribution towards flagship core and cluster facility for adults with learning
disabilities’
HEALTH & SOCIAL CARE
Page 71 of 104

Page 72

Page 72 of 104

Page 73

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Report 1 Adjustment 31-Oct-25
Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House New Build Programme
Beechgrove, Perth 49 49 110 49 0 0 0 0 49   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
49 0 49 110 49 0 0 0 0 49
Balhousie, Perth 150 150 187 150 0 0 0 0 150   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
150 0 150 187 150 0 0 0 0 150
Kinloch Gardens, Rattray (20 units) 1,417 1,417 1,417 1,417 0 0 0 0 1,417   
Council Tax (Second Income) (400) (400) (400) (400) 0 0 0 0 (400)
Scottish Government Subsidy 0 0 0 0 0 0 0 0
1,017 0 1,017 1,017 1,017 0 0 0 0 1,017
Kinloch Brae, Blairgowrie (4 units) 783 783 783 0 0 0 0 783   
Council Tax (Second Income) (80) (80) (80) 0 0 0 0 (80)
Scottish Government Subsidy (404) (404) (404) 0 0 0 0 (404)
Communted sums 0 0 0 0 0 0 0 0
299 0 299 0 299 0 0 0 0 299
Broich Road, Crieff (12 units) 2,716 2,716 2,716 0 0 0 0 2,716   
Council Tax (Second Income) (240) (240) (240) 0 0 0 0 (240)
Scottish Government Subsidy (1,242) (1,242) (1,242) 0 0 0 0 (1,242)
1,234 0 1,234 0 1,234 0 0 0 0 1,234
Future Developments 3,650 3,650 2 3,650 5,500 5,596 4,725 6,014 25,485   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
3,650 0 3,650 2 3,650 5,500 5,596 4,725 6,014 25,485
Total Council House New Build 6,399 0 6,399 1,316 6,399 5,500 5,596 4,725 6,014 28,234
Increase in Council House Stock
Council House Buy-Backs 14,760 1,050 15,810 10,263 15,810 1,310 1,305 1,305 1,305 21,035   
Scottish Government Subsidy (1,400) (1,050) (2,450) (1,400) (2,450) 0 0 0 0 (2,450)
13,360 0 13,360 8,863 13,360 1,310 1,305 1,305 1,305 18,585
National Trust Scotland (NTS), Dunkeld
Purchase of properties (20 units) 966 966 423 966 0 0 0 0 966   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
966 0 966 423 966 0 0 0 0 966
Total Increase in Council House stock 14,326 0 14,326 9,286 14,326 1,310 1,305 1,305 1,305 19,551
Standard Delivery Plan
Heating Upgrade Contract Works 1,492 1,492 542 1,492 811 0 0 0 2,303
Rewiring, Infrastructure & Property Refurbishment 1,339 1,339 915 1,339 0 0 0 0 1,339
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2025/26 to 2029/30
PERTH AND KINROSS COUNCIL
7
Page 73 of 104

Page 74

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Report 1 Adjustment 31-Oct-25
Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Triple Glazing 4,025 4,025 727 4,025 4,025 0 0 0 8,050
Controlled Door Entry 10 46 56 40 56 0 0 0 0 56 
- less Third Party Contribution 0 (7) (7) (7) 0 0 0 0 (7)
Kitchen Modernisation Programme 2,242 2,242 886 2,242 0 0 0 0 2,242
Bathroom Modernisation Programme 1,000 1,000 631 1,000 0 0 0 0 1,000
Adaptations (OT) 637 637 192 637 0 0 0 0 637
External Fabric 1,735 1,735 1,246 1,735 1,744 1,228 0 0 4,707 
- less Third Party Contribution (69) (69) (20) (69) 0 0 0 0 (69)
Energy Efficiency 691 691 587 691 0 0 0 0 691
Multi Storey Flats 1,754 1,754 792 1,754 0 0 0 0 1,754
Environmental Improvements 959 959 515 959 973 973 973 0 3,878
Fire Precaution Measures 8 380 388 8 388 1,000 735 0 0 2,123
Fire Alarm Replacement Programme 84 84 84 166 0 0 0 250
Sound Insulation 408 408 10 408 0 0 0 0 408
Structural Improvements 1,233 1,233 1,233 0 0 0 0 1,233
Retrofit Works 162 162 91 162 0 0 0 0 162
SHQS Future Developments 0 0 0 1,459 1,131 1,012 779 4,381
Total Standard Delivery Plan 17,710 419 18,129 7,162 18,129 10,178 4,067 1,985 779 35,138
Page 74 of 104

Page 75

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Report 1 Adjustment 31-Oct-25
Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 124 146 270 37 270 0 0 0 0 270
Rannoch Road, Perth - Housing Regeneration 70 15 85 76 85 0 0 0 0 85
149-151 Dunkeld Road, Perth 2 2 1 2 0 0 0 0 2
St.Catherine's Square Redevelopment 500 500 33 500 0 2,808 0 0 3,308
Lock-ups and Garage Sites 50 50 50 0 0 0 0 50
Shops & Offices 289 289 289 0 0 0 0 289
Greyfriars and Satellite Sites 73 73 73 0 0 0 0 73
Double Dykes Chalet Replacement 3,131 3,131 2,761 3,131 0 0 0 0 3,131 
- Scottish Government Grant (1,709) (1,709) (1,690) (1,709) 0 0 0 0 (1,709)
General Capital Works 56 56 42 56 0 0 0 0 56
Upgrade and Replacements to Lifts Programme 121 80 201 6 201 12 0 0 0 213
ICT Expenditure 162 162 114 162 0 0 0 0 162
Mortgage to Rent 249 249 121 249 0 0 0 0 249 
- less Government Grant (75) (75) (75) (75) 0 0 0 0 (75)
Total Other Investment in Council House Stock 3,043 241 3,284 1,426 3,284 12 2,808 0 0 6,104
Total Net Expenditure 41,478 660 42,138 19,190 42,138 17,000 13,776 8,015 8,098 89,027
Income
CFCR (1,684) (1,684) (1,684) (1,546) (1,613) (2,013) (2,385) (9,241)
TOTAL BORROWING REQUIREMENT 39,794 660 40,454 19,190 40,454 15,454 12,163 6,002 5,713 79,786
Page 75 of 104

Page 76

Page 76 of 104

Page 77

SIGNIFICANT CAPITAL PROJECTS
PROGRESS UPDATE
APPENDIX IV
Project Title Total
Gross
Budget
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On
Site
Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement 36,000 0 36,000 36,000
Opening August 2025
Phase 2 Completion
Date TBC
Yes Yes On track Yes - phase 1
completed
Practical completion of Phase 1 achieved on 11/08/25. Phase 2 works
delayed completion date tbc.
North/West Perth New
Primary School* 24,000 0 24,000 24,000 Summer 2028 No No On track Yes Project restarted, design to meet in November to review scope and
Stage 1 report issued prior to the projetc being paused.
Perth High School - New
School Investment 80,200 0 80,200 80,200 School opening as
planned August 2025 Yes Yes On track Yes - phase 1
completed School opened August 2025, phase 2 underway.
Bertha Park Link Road 13,200 0 13,200 15,258 December 2026 Yes Yes On track Yes - on site
Detailed design by Sweco complete. Following letter of intent, Stage 1
was awarded to BAM UK & Ireland in mid July 2025, and notice to
proceed to Stage 2 (main construction) given in late August 2025.
Construction work is progressing well, with the bulk of the earthworks,
drainage and kerbing now complete. The works are currently ahead of
programme and it is hoped that they will be substantially completed by
the end of the summer in 2026.
Comrie Flood Protection
Scheme 40,353 32,657 7,696 7,696 Autumn 2026 Yes Yes On track No Main construction works commenced in March 2025. Project on budget
and programmed for completion in October 2026.
Perth Eco Innovation Park* 32,817 17,711 15,106 15,106 Not currently
programmed No No
Design package
awarded - design
programme on track
Yes
[See previous reports in relation to funding.]  Contract Strategy and
Scope prepared and approved for engaging Triskelion through SCAPE.
Design contract signed in late October. Design activities progressed prior
to this under the mobilisation contract with ecological surveys,
archaeoligical aurveys, road alignment and underpass options appraisal
work near completion. Ground investigation scope and price is now
agreed and scheduled for a mid-November start onsite.
PH2O 73,847 0 73,847 73,847 Not currently
programmed No No
Thimblerow approved
as new site for PH2O
project, including
leisure water, at
Council on 18 June
2025.
Yes
Project Board established, programme under development, procurement
of main contractor and design team has commenced via hubco, selction
process to complete by end of December 2025 - design will then
commence based on June 2025 approved brief.
Bells Sport Centre 10,000 0 10,000 10,000 Not currently
programmed No No Approved 18 June
2025 Yes
Early stages of development, Contractor appointed for intrusive surveys ,
removal of RAAC and asbestos, feasibility of Counil vision will be
informed by surveys and strip out.
Kinross Community
Campus Sports Facilities 6,900 0 6,900 6,900 Not currently
programmed No No Approved 18 June
2025 Yes Early stages of development, will be updated in future reports
Crieff Community Campus
Sports Facilities 6,300 0 6,300 6,300 Not currently
programmed No No Approved 18 June
2025 Yes Early stages of development, will be updated in future reports
Crieff Drummond Arms -
Regenertaion 3,000 0 3,000 3,000
DBN Works due to be
completed October
2025; LBC applied for,
outstanding result for
the remainder of the
demolition
Yes Yes
DBN Works due to be
completed October
2025; LBC applied for,
outstanding result for
the remainder of the
demolition
n/a Demolition split into two parts. 1st part are all works listed within the
Dangerous Building Notice (DBN) are due to be completed in November
2025. For remainder of the demolition listed building consent (LBC) is
required. The building will  be made safe until LBC is achiveved, then the
demolition will recommence with the same contractor. 
Multi Storey Flats - Energy
Efficiency Works (HRA) 10,800 0,500 10,200 10,800
Phase 1 - Pomarium
Blocks 7-51 & 52-95
Completion July 2026.
Phase 2a - Market,
Milne and Lickley Court
Lifts December 2026,
Phase 2b Market, Milne
and Lickley Court EWI
works May 2027 and 1-
48 Potterhill Flats June
2028.
Yes Yes Pomarium blocks on
site currently.
n/a Phase 1 Pomarium Contract Works to two blocks on site until July 2026.
£5.7m Contract Sum. Works commenced on 14th July 2025. Block 1 is 7-
51 includes, 45 flats (8 storey tower block). Block 52-95 includes 44 flats
(11 storey tower block). Scottish Government HEEPS ABS funding
awarded July 2025 for Private Owners (applied for in May) and Private
Owners are share of cost are included in the Third Party Funding. Phase
2a MML Lift replacements Contract is £1.1m is signed/approved, Lifts in
Manufacture on site February 2026. Income is £340k from Private
Owners in blocks. Phase 2b for EWI/Roofing works (105 flats) is planned
for commencement on site July 2026 (grant funding application is to be
made in May 2026 as per Pomarium). Potterhill Flats (48 flats) planned
for July 2027 commencement. Budget shown for all six blocks.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 6-year programme.
7
Page 77 of 104

Page 78

Page 78 of 104

Page 79

CAPITAL BUDGET FINANCIAL RISKS APPENDIX V
1 Inflation Whilst inflation has reduced from the previous highs, there is evidence that
inflation may be starting to increase again. Many projects are also subject to
construction inflation affecting labour rates and materials costs, which may differ
from general retail inflation.
2 Interest Rates Higher interest rates mean that borrowing is more expensive, and therefore the
Council can afford to borrow less. If interest rates are higher than the
budgeted/estimated rates over the period of the budget, this means some capital
expenditure funded by borrowing may need to be reviewed.
3 Staff Capacity The ability of Services to deliver the Council’s approved plans may be limited to
the availability of appropriately qualified and experienced staff and their capacity
to deliver the projects in the budgeted timescales. Staff turnover and delays in
recruitment may lead to delays in delivering projects.
4 Changing priorities /
regulations
Changing regulations can affect projects, for example building regulations and
new climate change requirements may require construction projects to be
reviewed and modified to meet the new regulations. This may lead to delays and
increased costs. Also, changes to the local demographics may mean the
Council’s priorities change over time, particularly when considering the Capital
Budget over several years into the future.
5 Capital Grant The Scottish Government Capital Grant allocations are made on an annual basis,
and therefore subsequent years estimates cannot be guaranteed.
6 Developer
Contributions
Developer Contributions are payable into future years, usually in line with house
building rates, and act as a contribution towards infrastructure already delivered
and expensed. These contributions therefore reduce the need for borrowing in
future, with completed infrastructure costs already incurred. There is a risk that
developer plans do not progress as anticipated and this can result in contributions
not materialising. The Developer Contributions income budget is currently £18.608
million.
7 Compensation
Claims
The cost of completed capital projects can increase in future if claims for
compensation are received from contractors or other persons if land is purchased
or disturbed for projects. Whilst large capital projects include a degree of
contingency, the amounts potentially awarded for compensation can far exceed
this contingency and are not budgeted for.
7
Page 79 of 104

Page 80

Page 80 of 104

Page 81

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee: Finance and Resources Committee 
Date of Meeting: 26 November 2025 
Report Title: Treasury Activity and Compliance Report 2025/26 –
6 months to 30 September 2025 
Report Number: 25/328 
Report Author: John Jennings Senior Accountant 
Organisational Lead: Scott Walker Chief Finance Officer
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to update the Committee on Treasury Activity for
the period 1 April to 30 September 2025 and to report on compliance with the
Council’s Treasury Management Policy Statement (TMPS), Investment
Strategy and Prudential Indicators. 
1.2 This Treasury Activity and Compliance Report covers: 
1. Purpose
2. Recommendation
3. Economic Background
4. Treasury Activity
5. Compliance
6. Investment Strategy Compliance and Performance
7. Prudential Indicators
8 Conclusions
9. Impact and Value Assessment
10. Appendices 
2. Recommendation 
2.1 It is recommended that the Committee note the contents of this report. 
3. Economic Background 
3.1  The Bank of England’s Monetary Policy Committee (MPC) reduced the UK
Bank Base Rate from 4.5% to 4% over the 6 months to 30 September 2025. 
There was a base rate cut to 4.25% at their meeting on 8 May 2025 as
inflation had reduced, followed by a further cut on the 7 August 2025 to 4%.
8
Page 81 of 104

Page 82

The latter cut was in response to low economic growth despite concerns over
inflation rising again, driven by food and wage pressures. Consequently, it
was expected that there would be a more gradual approach to further cuts. 
3.2 CPI inflation increased to 3.5% in April 2025 from 2.6% in March 2025, before
falling to 3.4% for May. However, it rose again and was 3.8% for July, August
and September 2025. The largest contribution to the increases were a rise in
food, transport and hotel prices. UK GDP (Gross Domestic Product) was 0.3%
for the quarter to June 2025 and reducing from 0.7% in the previous quarter to
31st March 2025. 
3.3 Forecasts of the Bank Base Rate were that they would continue to fall but at a
slower rate than previously anticipated due to rising inflationary expectations
and global economic uncertainties. However, following the inflation figure for
September 2025, expectations are that inflation may have now peaked in the
current cycle, and the next cut to the Bank Base Rate may come earlier than
previously expected. 
3.4 Internationally, the Eurozone experienced growth of 0.1% in the 3 months to
30 June 2025, whilst CPI Inflation rose to 2.2% in September 2025, an
increase from 2% in August 2025. Eurozone interest rates were reduced to
2.15% in June 2025. In the US, GDP grew over the period closing at 3.8% at
the end of June 2025, whilst inflation increased over the period. The US
interest rate was reduced by 0.25% to the range of 4.00% to 4.25% in
September 2025. 
3.5 The Public Works Loan Board’s (PWLB) certainty fixed interest rates for the 6
months to 30 September 2025, which are based on yields on UK gilts, are
shown in the graph at Appendix I. As a result of mixed economic data and
market instability, borrowing rates showed continuing volatility over the period,
and generally rose over the 6-months. Whilst the 1-year rate fell over the
period (from 4.82% to 4.56%), all other rates were higher by the end of the 6-
month period, particularly for the longer durations, eg the 50 year PWLB rate
rose from 5.63% to 6% 
3.6 The increased levels of volatility in the financial markets since US tariffs were
first announced has continued, as markets react to new announcements and
developments, including the delaying of the introduction of some tariffs and
the extension of others. In this period, yields in all periods have moved
significantly (up and down) on a daily basis, but with a general rising trend
over the 6-month period. 
4. Treasury Activity 
4.1 A summary of the Council’s treasury position and transactions is shown at
Appendix II. The main activities are detailed below. 
4.2 During the period no new PWLB borrowing was undertaken. However, there
was the repayment of one maturing fixed rate maturity PWLB loan of £5
million borrowed at 3.65% for 11 years. In addition, there were also the
Page 82 of 104

Page 83

scheduled instalments made on two PWLB EIP (Equal Instalments of
Principal) loans for £5 million and £6.25 million. 
4.3 There were also two LOBO loans (Lender option Borrower Option) repaid
after the lender gave notice to amend the interest rate on the loans to 6.4%
and 6.41% respectively. Consequently, the Council applied its option to repay
both loans without penalty. The first loan repaid was for £5 million at 4.50%
and the second was for £5 million at 3.93%. 
4.4 As a result of the above transactions, the Council’s total long-term debt
reduced by £26.25 million from £715.2 million at an average interest rate of
2.91% to £688.95 million at an average interest rate of 2.86% as at 30
September 2025. 
4.5 There were eighteen short-term market loans borrowed in the period to
manage daily cashflows. This position arose as part of the adopted strategy
during periods when PWLB rates were high and allowed the Council to defer
longer-term borrowing. Consequently, a total of £81.5million was borrowed
for an average of 91 days at an average rate of 4.10%. There was
£61.5million of these temporary loans outstanding as at 30 September 2025. 
4.6 Common Good and Charitable Fund balances held on fixed deposit with the
Loans Fund remained unchanged at £2.711 million over the 6-month period,
at an average interest rate of 4.02%. Funds held from associated bodies and
organisations increased from £2.753 million to £2.933 million over the
period, in line with their own cash flow requirements, whilst the average rate
paid on these funds reduced  from 3.82% to 3.32% in line with the rates
applicable on individual loans depending on the balance held, and which are
linked to the prevailing Bank Base Rate. 
4.7 Short term cashflow surpluses are invested in a mixture of fixed term
deposits, instant access accounts and money market funds. All investments
were made in accordance with the approved Investment Strategy and
Permitted Investments 
Fixed Term Deposits 
4.8 Cashflow surpluses which arise during the year, and which are not
immediately required, are generally invested in fixed term deposits for periods
of up to 12 months, or up to 3 years where forecast cashflow requirements
allow. 
4.9 There were 5 fixed rate deposits made in the 6 months to 30 September 2025
(totalling £21.5 million) and at an average interest rate of 4.45% for an
average term of 64 days. This was a significant reduction in fixed deposit
activity in comparison to the previous 6 months to the end of March. The
deposits were undertaken where opportunities arose within cashflow
projections, however there were fewer opportunities as a result of the
Council’s current borrowing position. The fixed deposits undertaken in the
current period will generate interest of £166,796 by their maturity. 
Page 83 of 104

Page 84

Investments for Daily Cashflow Requirements  
4.10 Cashflow surpluses which are required for more immediate needs were
invested in the Council’s instant access and Money Market Funds. The
investment transactions in the period can be summarised as follows:
• The daily average amount of such funds increased from £6.11 million
in the previous quarter to £8.94 million at the end of the current period,
reflecting the Council’s use of MMF’s for liquidity and lower balances
available for investment. 
• The average interest rate achieved on these accounts over the period
reduced from 4.72% to 4.24%, in line with movements in the Bank
Base Rate. 
• Money Market Funds, which operate on instant access terms, were
used extensively over the period. The average amount invested
increased from £7.7 million in the previous period to £12.075 million
in the current period, whilst the average interest rate reduced from
4.73% to 4.24%.
• The activity on these accounts reflects the need to keep a sufficient
level of funds for more immediate cashflow purposes over the period.
• Interest generated on these investments over the 6-month period
amounted to £428,570. 
4.11 The total amount of investments outstanding as at 30 September 2025 was
£18.546 million compared to £24.117 million at the end of March 2025. The
overall average rate of interest on the investments outstanding reduced from
5.50% to 4.15% over this period. This reflects the maturing fixed deposits at
higher rates in the previous period and the reduction in base rate over the
current period. 
4.12 Total income generated on investments undertaken during the period totals
£595,366 (£744,900 in the 6 months to 31 March 2025). This measure reflects
the total return on the investment activity undertaken in the period and is
lower in comparison to the previous quarter as fixed term deposits and
interest rates decreased. 
4.13 All of the above investment activities are consistent with the Council’s current
investment strategy and cashflow requirements. 
5. Compliance 
5.1 For the period ending 30 September 2025, there were no breaches in
compliance with the Council’s approved Treasury Management Policy
Statement, Treasury Management Practices (TMP’s) or lending limits as
detailed in TMP 4 (Approved Instruments, Methods & Techniques).  
5.2 Appendix III shows the list of approved counterparties, based on the
Council’s current lending policy, as at October 2025.  
5.3 For the period ending 30 September 2025 the average closing cleared bank
balance was £20,731.73 in credit. This reflects the application of the Council’s
Page 84 of 104

Page 85

“sweep facility” operated by the bank, with any credit balance in excess of
£35,000 being “swept up” overnight to the Council’s instant access account. 
6. Investment Strategy Compliance and Performance 
6.1  The Treasury Investment Strategy for 2025/26 was approved by the Council
at its meeting on 5 March 2025 (report 25/39 refers).
6.2 In the current period, the level of the Council’s investments peaked at £55.325
million on 17 September and reduced to £18.546 million by 30 September
2025. The average daily investment balance over the period was £29.589
million, which reduced from an average of £33.154 million in the previous 6
months and from £62.145 million in the same period of last year. This
highlights the steady reduction in investment balances over the last year as
funds were applied in financing the approved Capital programme. By the end
of September 2025, there was only one fixed rate deposit remaining, whilst
the instant access balances reflect the minimum requirements to maintain
day-to-day liquidity. 
6.3 The approved Investment Strategy was applied in full over the period, with
liquidity being maintained using instant access accounts and Money Market
Funds as detailed in paragraph 4.10 above. There were no other risks
identified in the period.   
6.4 The Investment Strategy also incorporates investments held by the Common
Good Funds. All such investments during the period were with the Council’s
Loans Fund. The only Council funds held by external fund managers relate to
Council-administered Charitable Trusts and are, therefore, not covered by this
Investment Strategy. 
6.5  The budgeted income in 2025/26 for Commercial Property investments is
£1.866 million whilst the latest projection is £1.870 million. There were no
new property investments entered into during the current period. 
7. Prudential Indicators 
7.1 Prudential Indicators for 2025/26 to 2030/31 were approved by the Council at
its meeting on 5 March 2025 (report 25/39 refers) as part of the Annual
Treasury and Investment Strategy report.  
7.2 The latest estimates of the Prudential Indicators are shown in Appendix IV
and are based on the Council’s revised Capital Budget being considered at
this Committee meeting. These show that the Council adhered to all
Prudential Limits in the period. However, the annual Loan Charges relative to
the Net Revenue stream and the Capital Financing (Borrowing) Requirement
show an increasing trend, which reflects the latest estimates for the Capital
Programme and interest rate forecasts over the period. These will therefore
be kept under review. 
Page 85 of 104

Page 86

8 Conclusions 
8.1 The Bank of England’s MPC reduced the Bank Base Rate to 4.25% in May
2025 and again to 4.00% in August 2025 due to a period of low inflation and
economic growth. However, after expectations for future cuts in the Bank
Base Rate were reduced due to increasing inflationary pressures and
economic uncertainties, the current view is that the next cut in the Bank Base
Rate may come earlier than previously expected. 
8.2 Public Works Loans Board (PWLB) borrowing rates continued to be volatile
over the period due to inflationary expectations and mixed economic data.
Over the period the rates rose and were higher by 30 September 2025, with
only the 1-year rate falling. 
8.3 There was no new PWLB borrowing in the period, whilst there was the
repayment of PWLB loans totalling £16.25 million. There was also two LOBO
loans repaid totalling £10 million at an average rate of 4.22%. 
8.4 Investment activity in the period consisted of a reduced level of fixed term
deposits, whilst instant access and Money Market Funds were used extensively
to meet day-to-day cashflow requirements. The total level of investments
outstanding reduced. 
8.5 The Council adhered to its Investment Strategy and policies throughout the
period, with no breaches in compliance. The Council’s Prudential Indicators
were also adhered to throughout the period.  
9. Impact and Value Assessment 
9.1 This is an operational report, and as such, an impact and value assessment in
not required. 
10. Appendices 
Appendix I – PWLB Fixed Maturity Interest Rates from 1 April 2025 to 30
September 2025
Appendix II – Summary of the Treasury Position and Transactions from 1 April
to 30 September 2025
Appendix III – Approved Investment Counterparty List
Appendix IV – Monitoring of Prudential Indicators – Period ending 30
September 2025 
Page 86 of 104

Page 87

PWLB FIXED CERTAINTY INTEREST RATES
1 APRIL TO 30 SEPTEMBER 2025
Appendix I
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
6.50
01-Apr-25
08-Apr-25
15-Apr-25
22-Apr-25
29-Apr-25
06-May-25
13-May-25
20-May-25
27-May-25
03-Jun-25
10-Jun-25
17-Jun-25
24-Jun-25
01-Jul-25
08-Jul-25
15-Jul-25
22-Jul-25
29-Jul-25
05-Aug-25
12-Aug-25
19-Aug-25
26-Aug-25
02-Sep-25
09-Sep-25
16-Sep-25
23-Sep-25
30-Sep-25
1 Year
5 Years
10 Years
20 Years
30 Years
50 Years
8
Page 87 of 104

Page 88

Page 88 of 104

Page 89

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 APRIL 2025 TO 30 SEPTEMBER 2025
APPENDIX II
1 LONG TERM BORROWING
(a) Long Term Borrowing 1 April to 30 September 2025
Average Average Amount
No. Rate (%) Life (years) (£)
None
0 0.00% 0.0 0
(b) Long Term Debt Repayments 1 April to 30 September 2025
Average Amount
No. Rate (%) (£)
PWLB - Maturity Loan - Scheduled Repayments 1 3.65% 5,000,000
PWLB - EIP Loan - Scheduled Repayments 2 4.66% 11,250,000
LOBO Loans - Premature Repayments 2 4.22% 10,000,000
5 4.30% 26,250,000
(c) Long Term Debt Outstanding
Outstanding Average Outstanding Average
31-Mar-25 Rate 30-Sep-25 Rate
£ £
Public Works Loan Board 652,000,000 2.76% 635,750,000 2.72%
Money Market Loans 63,200,000 4.51% 53,200,000 4.57%
TOTAL 715,200,000 2.91% 688,950,000 2.86%
2 SHORT TERM BORROWING
(a) Short Term Market Borrowing - 1 April to 30 September 2025
Average Average Average Interest
No. Amount (£) Rate (%) Term (Days) (£)
Temporary borrowing 18 4,527,778 4.10% 91 749,712.19
18 4,527,778 4.10% 91 749,712.19
(b) Short Term Borrowing Outstanding
Outstanding Average Outstanding Average
31-Mar-25 Rate 30-Sep-25 Rate
£ £
Market Borrowing 0 0.00% 61,500,000 4.06%
Common Good and Charitable Funds 2,710,569 4.02% 2,710,569 4.02%
Local Trusts & Investors 2,752,542 3.82% 2,933,157 3.32%
TOTAL 5,463,111 3.92% 67,143,726 4.02%
8
Page 89 of 104

Page 90

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 APRIL 2025 TO 30 SEPTEMBER 2025
APPENDIX II
3 INVESTMENTS
(a) Investment Transactions - 1 April to 30 September 2025
Average Average Average Total
Fixed Deposits & Investments No. Amount (£) Rate (%) Term (Days) Interest (£)
Foreign Banks and Institutions 3 15,000,000 4.43% 91 146,884.93
Other Local Authorities 2 3,250,000 4.50% 25 19,910.96
5 10,300,000 4.44% 83 166,795.89
Average Average Total
Instant/Notice Accounts & Money Market Funds Amount (£) Rate (%) Interest (£)
Instant Access/Notice accounts 73,140 3.58% 787.89
Money Market Funds 12,075,354 4.24% 427,782.11
8,938,887 4.24% 428,570.00
(b) Investments Outstanding Outstanding Average Outstanding Average
31-Mar-25 Rate 30-Sep-25 Rate
£ £
UK Banks 42,322 3.59% 70,962 2.62%
Foreign Banks and Institutions 0 0.00% 5,000,000 4.34%
Other Local Authorities 15,000,000 6.07% 0 0.00%
Money Market Funds 9,075,000 4.57% 13,475,000 4.09%
TOTAL 24,117,322 5.50% 18,545,962 4.15%
Page 90 of 104

Page 91

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Fitch Credit CDS Maximum
Country Rating Range Lending
Category 1 - Principal UK Clearing Banks  -  40% Investment total (or £20M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Bank of Scotland (RFB) (5) UK AA-, F1+ In range 12 months
Barclays Bank plc (NRFB) (5) UK A+, F1 No data 6 months
Barclays Bank plc (RFB) (5) UK A+, F1 In range 6 months
Goldman Sachs International Bank UK A+, F1 In range 6 months
Handelsbanken plc UK AA, F1+ No data 12 months
HSBC Bank plc (NRFB) UK AA-, F1+ In range 12 months
HSBC Bank plc (RFB) UK AA-, F1+ No data 12 months
Lloyds Bank Corporate Markets Plc (NRFB) UK AA-, F1+ No data 12 months
Lloyds Banking Group plc (RFB) UK AA-, F1+ In range 12 months
NatWest Markets Plc (NRFB) UK AA-, F1+ In range 12 months
Royal Bank of Scotland plc (RFB) (inc Nat West) UK AA-, F1+ In range 6 months
Santander UK plc (inc Cater Allen) UK A+, F1 No data 12 months
Standard Chartered Bank UK A+, F1 In range 6 months
Category 2 - Foreign Banks & Institutions -  25% Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Australia and New Zealand (ANZ) Banking Group Ltd Aus AA-, F1+ In range 12 months
Commonwealth Bank of Australia Aus AA-, F1+ In range 12 months
Macquarie Bank Ltd Aus A+, F1 No data 12 months
National Australia Bank Ltd Aus AA-, F1+ In range 12 months
Westpac Banking Corporation Aus AA-, F1+ In range 12 months
BNP Paribas Fortis Bank Belgium A+, F1 No data 1 month
KBC Bank Belgium A+, F1 No data 1 month
Bank of Montreal Can AA-, F1+ No data 12 months
Bank of Nova Scotia Can AA-, F1+ No data 12 months
Canadian Imperial Bank of Commerce Can AA-, F1+ No data 12 months
National Bank of Canada Can A+, F1 No data 12 months
Royal Bank of Canada Can AA-, F1+ No data 12 months
Toronto Dominion Bank Can AA-, F1+ No data 12 months
Danske Bank Denmark A+, F1 In range 6 months
Nordea Bank Finland plc Finland AA-, F1+ No data 1 month
BNP Paribas France A+, F1 In range 1 month
Credit Agricole Corporate and Investment Bank France A+, F1 In range 1 month
Credit Agricole SA France A+, F1 In range 1 month
Credit Industriel et Commercial France A+, F1 No data 1 month
DZ Bank AG Germany AA-, F1+ No data 12 months
Landesbank Hessen-Thueringen Girozentral (Helaba) Germany A+, F1+ In range 12 months
Landwirtschaftliche Rentenbank Germany AAA, F1+ No data 24 months
NRW Bank Germany AAA, F1+ No data 24 months
ABN AMRO Bank Netherlands A, F1 No data 6 months
Bank Nederlandse Germeenten Netherlands AAA, F1+ No data 24 months
Cooperatieve Rabobank Netherlands A+, F1 In range 12 Months
ING Bank Netherlands AA-, F1+ In range 12 Months
DBS Bank Limited Singapore AA-, F1+ No data 12 months
United Overseas Bank Ltd Singapore AA-, F1+ No data 12 months
Skandinaviska Enskilda Banken AB Sweden AA-, F1+ No data 12 months
Svenska Handelsbanken AB Sweden AA, F1+ No data 12 months
Swedbank AB Sweden AA-, F1 No data 12 months
UBS AG Switzerland A+, F1+ In range 12 months
Bank of America, NA USA AA, F1+ No data 12 months
Bank of New York Mellon USA AA, F1+ No data 24 months
Citibank, NA USA A+, F1 In range 12 months
JP Morgan Chase Bank, NA USA AA, F1+ No data 12 months
Wells Fargo Bank, NA USA AA-, F1+ In range 12 months
8
Page 91 of 104

Page 92

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Category 3 - Subsidiary Banks & Building Societies - 15% of Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
(parent bank shown in brackets)
Subsidiary Banks
None
Building Societies
Nationwide Building Society UK A, F1 No data 6 months
Category 4 - Other Local Authorities - 20% of Investment total (or £20M per Counterparty if higher)
As arranged
With the exclusion of the below:
Northamptonshire County Council Budgetary issues
Lancashire County Council Regulatory issues
Spelthorne Borough Council Commercialism activities
London Borough of Croydon Commercialism activities
Thurrock Council Excessive short-term exposure/strategy
Plymouth City Council Regulatory issues
City of Liverpool Council Regulatory issues
Wirral Council Budgetary issues
London Borough of Bexley Budgetary issues
Slough Borough Council Budgetary issues
Peterborough City Council Budgetary issues
Nottingham City Council Budgetary issues
Woking Council Budgetary/debt issues
Category 5 Money Market Funds - 10% of Investment Total (or £10M per Counterparty if higher)
(Minimum rating required Fitch AAA)
Aberdeen Standard Investments UK AAA
Aviva Investors Liquidity Fund UK AAA
Federated Sterling Liquidity Fund (Class 3) UK AAA
Insight Sterling Liquidity Fund (Class 5) UK AAA
Deutsche Bank Sterling Fund UK AAA
Note:
(1) - Standard & Poor's credit ratings shown, as no Fitch credit rating available
(2) - All Soveriegn credit ratings for above Countries are AAA, unless stated otherwise.
Last Updated: 21-Oct-25(3) -  NRFB = Non Ring Fenced Bank,  RFB = Ring Fenced Bank
Page 92 of 104

Page 93

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 30 SEPTEMBER 2025
APPENDIX IV
1 Financing Costs:Net Revenue Stream
The ratio of Capital Financing Costs (Loan Charges) to the Council's net revenue stream shall not exceed the following limits, which are based on historic levels, and allow some
headroom for movement in interest rates. The estimated Financing Costs below are based on the latest monitoring figures.
2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Prudential Limit - General Fund 15.00% 15.00% 15.00% 15.00% 15.00% 15.00%
Estimated Ratio of Financing Costs to Revenue 8.20% 8.58% 9.10% 9.44% 9.64% 9.84%
Prudential Limit - HRA 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
Estimated Ratio of Financing Costs to Revenue 23.78% 26.04% 27.25% 27.51% 27.49% 27.47%
2 Gross & Net Borrowing and Capital Financing Requirements
For prudence, net external borrowing must not exceed the total capital financing requirement, thus ensuring that over the medium term, borrowing is only undertaken for capital
purposes. The estimated total net borrowing and Capital Financing Requirement at the end of each of the years are as follows:
Actual as at Projected Projected Projected Projected Projected Projected
30-Sep-25 31-Mar-26 31-Mar-27 31-Mar-28 31-Mar-29 31-Mar-30 31-Mar-31
Net External Borrowing* 839,940,000 927,012,000 1,021,711,000 1,101,210,000 1,163,310,000 1,212,909,000 1,272,208,000
Gross External Borrowing* 858,486,000 942,012,000 1,036,711,000 1,116,210,000 1,178,310,000 1,227,909,000 1,287,208,000
Capital Financing Requirement 953,483,000 1,032,783,000 1,107,457,000 1,167,844,000 1,208,887,000 1,249,900,000 1,308,929,000
*For the purpose of this indicator, Borrowing includes the outstanding liability under PPP/PFI contracts.
3 Estimates of Gross Capital Expenditure
The total estimated Capital Expenditure contained within the Council's Budgets for each year is as follows, based on updated monitoring figures.
Composite Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current estimate 137,280,000 113,546,000 87,406,000 71,099,000 70,187,000 80,529,000
Original Budget Estimate 147,463,000 131,218,000 90,468,000 65,909,000 48,527,000 44,716,000
Movement in Estimated Capital Expenditure (10,183,000) (17,672,000) (3,062,000) 5,190,000 21,660,000 35,813,000
The Original Budget Estimates are those per the Capital Monitoring Report on 30 April 2025, and incorporating 2030/31 approved expenditure from 26 February 2025
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 2 on 26 November 2025.
HRA Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current estimate 42,138,000 17,000,000 13,776,000 8,015,000 8,098,000 20,000,000
Original Budget Estimate 28,098,000 14,411,000 14,265,000 12,076,000 20,044,000 20,000,000
Movement in Estimated Capital Expenditure 14,040,000 2,589,000 (489,000) (4,061,000) (11,946,000) 0
The Original Budget Estimates are those per the Capital Monitoring report on 30 April 2025, and incorproating 2029/30 approved expenditure on 27 January 2025, and an estimate for 2030/31.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 2 on 26 November 2025.
8
Page 93 of 104

Page 94

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 30 SEPTEMBER 2025
APPENDIX IV
4 Estimate of Capital Financing Requirement
The estimate (as at October 2025) of the Capital Financing Requirement (ie new borrowing requirement for Capital Expenditure) for each year based on these plans is as follows:
Composite Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current Estimated Capital Financing Requirement 118,538,000 85,321,000 63,093,000 51,468,000 51,762,000 58,815,000
Original Budget Estimate 132,216,000 103,393,000 67,055,000 48,178,000 30,302,000 26,966,000
Movement in Estimated Capital Financing Requirement (13,678,000) (18,072,000) (3,962,000) 3,290,000 21,460,000 31,849,000
The Original Budget Estimates are those per the Capital Monitoring Report on 30 April 2025, and incorporating 2030/31 approved expenditure from 26 February 2025
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 2 on 26 November 2025.
HRA Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current Estimated Capital Financing Requirement 40,454,000 15,454,000 12,163,000 6,002,000 5,713,000 17,500,000
Original Budget Estimate 26,615,000 12,865,000 12,652,000 10,063,000 17,659,000 17,500,000
Movement in Estimated Capital Financing Requirement 13,839,000 2,589,000 (489,000) (4,061,000) (11,946,000) 0
The Original Budget Estimates are those per the Capital Monitoring report on 30 April 2025, and incorproating 2029/30 approved expenditure on 27 January 2025, and an estimate for 2030/31.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 2 on 26 November 2025.
5 External Debt (Gross and Net)
As at Projected Projected Projected Projected Projected Projected
External Borrowing 30-Sep-25 31-Mar-26 31-Mar-27 31-Mar-28 31-Mar-29 31-Mar-30 31-Mar-31
Public Works Loan Board 635,750,000 777,500,000 885,000,000 990,000,000 1,057,500,000 1,112,500,000 1,177,500,000
Market Bonds (LOBOs) 53,200,000 53,200,000 53,200,000 33,200,000 33,200,000 33,200,000 33,200,000
Project Borrowing 0 0 0 0 0 0 0
Special Loans 2,710,569 2,710,569 2,710,569 2,710,569 2,710,569 2,710,569 2,710,569
Temporary Loans/Other Borrowing 64,433,157 10,000,000 2,600,000 2,500,000 2,500,000 2,500,000 2,500,000
Other Long Term Liabilities (PPP/PFI) 102,391,816 98,601,472 93,200,672 87,799,872 82,399,072 76,998,272 71,297,472
Total Gross External Debt 858,485,542 942,012,041 1,036,711,241 1,116,210,441 1,178,309,641 1,227,908,841 1,287,208,041
Short Term Investments (18,545,962) (15,000,000) (15,000,000) (15,000,000) (15,000,000) (15,000,000) (15,000,000)
Long Term Investments 0 0 0 0 0 0 0
Total Net External Debt 839,939,580 927,012,041 1,021,711,241 1,101,210,441 1,163,309,641 1,212,908,841 1,272,208,041
Note:
Operational Boundary 859,000,000 943,000,000 1,037,000,000 1,117,000,000 1,179,000,000 1,228,000,000 1,288,000,000
Authorised Limit 1,300,000,000 1,300,000,000 1,300,000,000 1,300,000,000 1,300,000,000 1,300,000,000 1,300,000,000
The Operational Boundary and Authorised Limit are based on Gross External Debt.
Page 94 of 104

Page 95

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 30 SEPTEMBER 2025
APPENDIX IV
6 Principal Sums Invested Longer Than 365 Days
The Upper Limit for sums invested for over 1 year up to 3 years is £45 million. There were no amounts invested within this period as at 30 September 2025.
7 MATURITY STRUCTURE
The lower and upper limit for the proportion of the Council's total-long term debt which matures in each of  the time bandings below, and is therefore subject to refinancing at the
prevailing market rates, is as follows:
Borrowing Maturity Structure Lower Limit Upper Limit Estimated
Under 12 months 0% 35% 3.16%
over 12 months and < 24 months 0% 35% 3.53%
over 2 years and < 5 years 0% 50% 13.10%
over 5 years and < 10 years 0% 75% 5.41%
over 10 years 10% 95% 74.80%
The maurity profile for the Council's current long-term portfolio as at 31st March 2025, measured from the start of the financial year, is as follows:
Less 1 Year 1 - 2 Years 2 - 5 Years 5 - 10 Years 10 - 20 Years 20 - 30 Years 30 - 40 Years 40 - 50 Years Over 50 Years Total
PWLB 21,250,000 22,500,000 67,500,000 20,000,000 5,000,000 2,000,000 93,500,000 404,000,000 0 635,750,000
LOBOs 0 0 20,000,000 0 0 8,000,000 25,200,000 0 0 53,200,000
Other 0 0 0 0 0 0 0 0 0 0
PPP/PFI 3,790,344 5,400,800 16,202,400 22,803,200 54,195,072 0 0 0 0 102,391,816
Total 25,040,344 27,900,800 103,702,400 42,803,200 59,195,072 10,000,000 118,700,000 404,000,000 0 791,341,816
Percentage 3.16% 3.53% 13.10% 5.41% 7.48% 1.26% 15.00% 51.05% 0.00% 100.00%
Page 95 of 104

Page 96

Page 96 of 104

Page 97

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________  
Committee or Board: Housing & Social Wellbeing Committee / Finance &
Resources Committee 
Date of Meeting: 26 November 2025 
Report Title: Missing Shares Service – Update on Progress and
Next Steps 
Report Number: 25/323 
Report Author: Kirsty Steven, Principal Officer – Environmental
Health EH@pkc.gov.uk 
Organisational Leads: Elaine Ritchie, Strategic Lead – Housing &
Communities
Scott Walker, Chief Finance Officer
___________________________________________________________________ 
1. Purpose 
1.1 This report provides an update on the progress made through the Missing
Shares Service and seeks support to continue using the second homes
budget to underwrite the value of predicted missing shares.   
1.2 It also seeks support to increase the current maximum allocation per share
and make the Missing Shares Officer post permanent. 
1.3 Sections 
1. Purpose
2. Recommendations
3. Background
4. Context and Main Issues
5. Proposals
6. Conclusion
7. Impact and Value Assessment
8. Appendices 
9
Page 97 of 104

Page 98

2. Recommendations 
It is recommended that Housing and Social Wellbeing Committee: 
2.1 Supports the ongoing use of the second homes budget to underwrite the
expected future Missing Shares until the applications approved within the pilot
period are concluded. 
2.2 Supports an increase to the current maximum allocation per share. 
2.3 Supports the proposal to make the Missing Shares officer post permanent. 
2.4 Acknowledges the continued success of the pilot, and the increasing service
demand. 
2.5 Recognises the existing, effective financial mechanisms in place to secure
missing share recovery. 
It is recommended that Finances and Resources Committee: 
2.6 Approves the ongoing use of the second homes budget to underwrite the
expected future Missing Shares until the applications approved within the pilot
period are concluded. 
2.7 Approves an increase to the current maximum per share from £10,000 to
£30,000, with Strategic Lead approval beyond this amount. 
2.8 Approve the proposal to make the Missing Shares officer post permanent. 
2.9 Acknowledges the continued success of the pilot, and the increasing service
demand. 
2.10 Recognises the existing, effective financial mechanisms in place to secure
missing share recovery. 
3. Background 
3.1 The original committee report seeking the pilot of a Missing Shares Service
was approved on 31 May 2021 for a two-year period, with an Officer, and
£200k of recoverable funding to underwrite Missing Shares payments from
the second homes budget. 
3.2 Three years later in June 2024, with a successful service established and
increasing demand, an extension to the pilot for a further 3 years was agreed
at committee until September 2027, under the same financial arrangements
and with the ongoing employment of the Missing Shares Officer. 
Page 98 of 104

Page 99

3.3 Since its inception, the service has grown from strength to strength, delivering
clear benefits to users and generating savings across the Council and
beyond. Highlights of its success include: 
• Handled over 250 enquiries, resulting in £4 million worth of communal
repairs, with £1 million of these repairs successfully completed solely
through the provision of support and advice to property owners Only 29
Missing Shares applications were required, of which 19 are now
concluded. Notably, 5 required no payment due to prompt repayment
following completion of works.
• Delivered communal repair information sessions in partnership with
organisations such as Perth & Kinross Heritage Trust, Under One Roof,
and Novoville. These were complemented by building condition and
maintenance tours in Perth City Centre and the establishment of a
‘Buildings in Disrepair’ working group.
• Fostered collaborative working across PKC services, including Housing
Repairs, PKC Lets, Vacant Properties, Building Standards, and
Environmental Health, and with external partners, particularly Perth &
Kinross Heritage Trust. These joint efforts have enhanced support,
improved efficiency, and unlocked additional funding. 
4. Context and Main Issues 
4.1 The service receives an average of 50-70 enquiries per year. However, the
rising cost of applications indicates that the funding required for missing
shares is likely to increase significantly over the next 2-3 years. 
4.2 Positively, all missing shares to date have been secured against the relevant
properties.  In many cases, recovery has been swift, either through timely
payment or structured payment plans, typically over a maximum five years. 
4.3 While most application demand is concentrated in Perth; the service provides
advice and support across Perth and Kinross. Completed applications have
also been delivered in Crieff and Muthill.   
4.4 The service is now drawing on additional external funding streams to enhance
financial support for owners who may not meet the standard missing shares
criteria.  This includes funding from Perth & Kinross Heritage Trust and UK
Shared Prosperity Fund, with ongoing discussions underway with the
Council’s External Funding team. 
4.5 Efforts are also being made to promote proactive building maintenance,
helping owners avoid large-scale repairs and associated costs, which can
often be prohibitive to owners. 
4.6 To ensure the missing shares funding allocation delivers maximum impact,
priority is given to facilitating substantial repair works rather than temporary
patch repairs. As such, the maximum allocation per share and timescales for
pending and predicted works have been reviewed. 
Page 99 of 104

Page 100

Examples of pending works include full roof replacements, comprehensive
building surveys and masonry rebuilding. 
4.7 Spend to date, allocated funds, and recovery details are provided in
Appendix 1.  However, it is uncommon for the full application process, from
submission to completion of works and final missing shares payment request,
to fall within a single financial year. 
4.8 As a result, there is a discrepancy between the total value of applications
received and the combined total of missing shares paid or pending. In some
cases, additional works are identified after commencement, or the missing
share is repaid before completion, meaning no payment is ultimately
required.     
4.9 AIl missing shares are secured through a recharging order against the
benefitting properties. Encouragingly, 22% have already been recovered, and
51% are in active recovery, indicating a strong repayment rate.   
5. Proposals 
5.1 As detailed in Appendix 1, approximately £207,000 of missing shares has
already been approved, pending completion of works – most of which are
expected to be paid within the next year. 
5.2 In addition, there is a further projected demand of £300,000, which would
support £670,000 worth of repairs across 12 buildings, comprising 65
residential and 15 commercial properties. 
5.3 This brings the total expected missing shares requirement to £507,000 during
the pilot period. 
5.4 Given the rising demand, approval is sought to continue using the second
homes budget to underwrite the recoverable spend and ensure the service
can continue.   
5.5 It is also recommended that existing procedures be updated to increase the
maximum allocation per missing share from £10,000 to £30,000, reflecting the
scale of repair costs in many cases. Applications exceeding this amount
would require approval from either the Strategic Lead for Finance & Business
Support (Chief Finance Officer) or Housing & Communities. 
5.6 Given the ongoing and growing demand for the service, it is further proposed
that the position of Missing Shares Officer is made permanent, using the
second homes budget, to ensure continuity in service delivery.   
6. Conclusion 
6.1 The Missing Shares Service has become a vital tool in supporting property
owners, particularly those in vulnerable situations, by helping to address
inequalities linked to poor housing conditions. 
Page 100 of 104

Page 101

These challenges, often worsened by the cost-of-living crisis, have a direct
impact on mental and physical wellbeing. The service directly supports the
aims of the PKC Community Plan 2022–2032 by targeting resources where
they are needed most. 
6.2 The outcomes speak for themselves: improved living conditions, safer and
more sustainable buildings, and the preservation of valuable housing stock.
The service empowers owners to take control of essential repairs, often
safeguarding their only significant asset and building confidence for future
maintenance. 
6.3 The increasing scale of works requested through missing shares applications
highlights the urgent need to address severe deterioration of buildings across
Perth & Kinross, a challenge this will only intensify with the impacts of climate
change. 
6.4 By continuing to underwrite Missing Shares through the second homes
budget and increasing the maximum share allocation, the Council can remove
financial barriers, enable critical repairs, and reduce pressure on other
services. This will ensure the long-term sustainability of our communities and
reinforce our commitment to fairness, wellbeing, and resilience. 
7. Impact and Value Assessment 
7.1 Link to IVA 
8. Appendices 
Appendix 1 – Recovery Breakdown     
Page 101 of 104

Page 102

Page 102 of 104

Page 103

Appendix 1
Value of MS Applications Approved (& Works Completed) 
22/23  23/24  24/25  25/26  Total 
£15,820.75  £83,412.33  £107,716.16  £60,258.33  £276,208 
Value of Missing Shares Paid (some shares paid/not needed/paying in instalments
etc) 
22/23  23/24  24/25  25/26  Total 
£0  £17,690.81  £60,470.30  £42,210.85  £120,371 
Pending Missing Shares (works approved & underway but Missing
Shares not yet paid) 
£206,739 
Recovered missing share payments (Note these figures are awaiting financial update) 
Total Invoiced 
(MS Paid +15% +£80 per
share) 
£138,145 
Recovered*  Payment Plan in
Progress** 
Secured Debt*** 
£29,932 (22%)   £70,396 (51%)   £37,817 (27%)  
*Recovered – Full Missing Share debt paid back to PKC by the owner **Payment Plan in
Progress – Owners have arranged a monthly repayment plan basis until the full amount is
repaid, normally within 5 years 
***Secured Debt - The owner has made no current payment towards the Missing Share
debt, but the amount is secured against the property to be recovered at sale and
undergoing standard debt recovery procedures in the interim. 
9
Page 103 of 104

Page 104

Page 104 of 104