Page 1

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee: Finance and Resources Committee 
Date of Meeting: 26 November 2025 
Report Title: 2025/26 Revenue Budget – Update No. 2 
Report Number: 25/326 
Report Author: Scott Walker, Chief Finance Officer 
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to provide an update on progress with the
2025/26 General Fund Revenue Budget based upon the August 2025 ledger,
updated for any subsequent known material movements, and the projected
financial position of the Housing Revenue Account. 
1.2 The total net projected overspend on the 2025/26 General Fund Management
Budget, currently is £339,000 (see Appendix 1).  This has reduced since the
last update following the decision of Council on 29 October to apply up to
£4.180 million to address the growing in-year demand for social care. 
1.3 Sections 
1. Purpose
2. Recommendations
3. Background
4. 2025/26 Revenue Monitoring
Service Budgets
Corporate Budgets
Funding
Other Updates
5. 2025/26 Revenue Budget Adjustments
Additional Funding
Virements
Movements In Reserves
6. Financial Risks
7. Conclusion
8. Impact and Value Assessment
9. Appendices

Page 2

2. Recommendations 
It is recommended that the Committee: 
2.1 Note the contents of the report, 
2.2 Note the projected outturn for the General Fund set out in Section 4 and
Appendix 1 and 2, 
2.3 Approve the adjustments to 2025/26 General Fund budgets set out in Section
5 and Appendices 1,2,4,5,6 and 7 
2.4 Note the financial risks set out in Section 6 and Appendix 8. 
3. Background 
3.1 This report updates the Committee on progress with the 2025/26 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the August 2025 ledger,
updated for any subsequent known material movements. 
3.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2025/26 Revenue Budget on 26
February 2025 (Report No. 25/36 refers).  In addition, adjustments approved
by the Finance and Resources Committee on 30 April, 25 June and 1 October
2025 (Report No’s 25/99, 25/172 and 25/248 refer) are reflected in Appendix
1 (Column 2).  In addition, approval to apply additional resources to Perth and
Kinross Health and Social Care Partnership on 29 October 2025 is also
reflected ( Report No /25/278 refers). 
4. 2025/26 Revenue Monitoring 
Service Budgets 
4.1 The total net projected overspend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £300,000 which represents 0.1%
of total net Service expenditure. 
4.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
4.3 The management of Service over and underspends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
4.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets.

Page 3

Education and Learning 
4.5 There is currently a projected underspend for Education and Learning
excluding Devolved School Management (DSM) and the Pupil Equity Fund
(PEF) of £51,000 or 0.03% of the budget which represents a positive
movement of £51,000.  The individual elements contributing to this position
are summarised in the following table with commentary on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Education and Learning Core Overspend 6 0.5 -
Nursery Sector Underspend (361) (1.1) 180
Primary Sector Overspend 1,114 2.0 -
Secondary Sector Underspend (489) (8.7) 171
Special Sector Overspend (41) (0.2) (122)
Home to School Transport Underspend (280) (2.0) (280)
TOTAL Underspend (51) (0.0) (51) 
4.6 In the Nursery Sector, there is a reduction in the projected underspend of
£180,000 due to updated staff cost projections. 
4.7 Within the Secondary Sector, there is a reduction in the projected
underspend of £171,000 due to updated staff cost projections. 
4.8 In the Special Sector there is a reduction in the projected net overspend of
£122,000 due to updated staff cost projections and reductions in the cost of
independent school placements. 
4.9 In Home to School Transport there is a projected under spend of £280,000
due to a reduction in the number of school days, smaller increase than
budgeted and a rationalisation of vehicles. 
4.10 The Devolved School Management Scheme is currently projected to be on
target.  However, some schools are experiencing challenges in delivering
approved staff slippage targets and facing inflationary pressures against
budgets that have been reduced over previous years.  The budgets for the
Devolved School Management scheme are allocated by financial year (April –
March), whereas expenditure is incurred by academic year (August – June). 
4.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be on target. 
Children, Families and Justice 
4.12 There is currently a projected underspend for Children, Families and Justice
of £270,000 or 1.0% of the approved budget, which represents the same
position as the last update to Committee.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below.

Page 4

Function Projected Outturn Movement 
£’000 % £’000
Children & Families Underspend (270) (1.2) -
Justice Service On Target - - -
TOTAL Underspend (270) (1.0) - 
4.13 In Children and Families, there is a reduction in the projected overspend on
staff costs which is offset by an increase in the cost of residential placements. 
Economy, Development and Planning 
4.14 There is currently a projected underspend for Economy, Development and
Planning of £53,000 or 0.3% of the approved budget which represents a
positive movement of £201,000.  The individual elements contributing to this
position are summarised in the following table with narrative on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Overspend 47 0.8 (30)
Tourism, Culture and Place Overspend 100 2.1 29
Development Management and
Building Standards
Underspend (200) - (200)
TOTAL Underspend (53) 0.3 (201) 
4.15 In Development Management and Building Standards, there is an
increase in the projected underspend of £200,000 due to additional income
from planning applications. 
Environment and Infrastructure 
4.16 The projected outturn for Environment and Infrastructure is currently
anticipated to be £525,000 or 1.6% more than budget, which represents an
adverse movement of £500,000.  The individual elements contributing to this
position are summarised in the following table with narrative on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Overspend 500 (4.0) 500
Traffic and Network Underspend (100) (8.0) (50)
Waste Disposal Underspend (250) (2.9) -
Refuse Collection Overspend 175 3.4 -
Fleet Overspend 200 - 50
TOTAL Overspend 525 1.6 500 
4.17 Service wide there is a projected overspend of £500,000 due to updated staff
cost projections which currently indicate that the budgeted slippage target will
not be achieved.

Page 5

4.18 In Traffic and Network there is an increase in the projected underspend of
£50,000 due to additional income from statutory road network charges. 
4.19 In Fleet, there is an increase in the projected overspend of £50,000 following
a review of vehicle materials and repairs. 
Housing and Communities 
4.20 The projected outturn for Housing and Communities is currently anticipated
to be £257,000 or 1.3% more than budget, an adverse movement of
£273,000.  The individual elements contributing to this movement are
summarised in the following table with commentary on the significant
variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Bereavement Services Overspend 14 1.7 -
Public Transport Unit Overspend 75 (0.5) 105
Parking and Civil
Contingencies
Overspend 94 - 94
Specialist Services Overspend 74 1.16 74
TOTAL Overspend 257 1.3 273 
4.21 In the Public Transport Unit there is a reduction in the projected underspend
of £105,000 due additional expenditure on park and ride services and Perth
Bus Station, and a reduction in income from park and ride departure charges. 
4.22 Within Parking and Civil Contingencies there is a projected overspend of
£94,000 on the visitor ranger service due to additional demands for the
service in the year to date. 
4.23 In Specialist Services, there is a projected overspend of £74,000 due to set
up costs for temporary accommodation due to increased demand. 
Property Services 
4.24 The projected outturn for Property Services is currently anticipated to be
£154,000 or 0.2% more than budget, a positive movement of £68,000.  The
individual elements contributing to this movement are summarised in the
following table with commentary on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide  Overspend 662 1.5 (116)
Energy Underspend (780) (10.0) 60
Facilities Management Overspend 418 12.2 -
Catering Underspend (146) (1.7) (12)
TOTAL Overspend 154 0.2 (68)

Page 6

4.25 On a Service Wide basis, there is a reduction in the projected overspend of
£116,000.  This is due primarily to savings on water consumption following a
recent audit. 
4.26 On Energy, there is a reduction in the projected underspend of £60,000
based on the latest consumption information. 
Legal and Governance 
4.27 Within Legal and Governance there is a projected underspend of £108,000
or 2.6%, which represents an adverse movement of £53,000.  This is made
up of updated assumptions on income, staff costs and supplies and services. 
Customer and Digital Services 
4.28 The projected outturn for Customer and Digital Services is currently
anticipated to be £13,000 or 0.1% less than budget, which represents a
favourable movement of £93,000.  The individual elements contributing to
this movement are summarised in the following table with commentary on the
significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
IT and Customer Services Underspend (87) (1.16) (37)
Revenues and Benefits Overspend 74 1.34 (56)
TOTAL Underspend (13) (0.1) (93) 
4.29 In IT and Customer Services and Revenues and Benefits there is an
reduction in the projected spend of £93,000 due to updated staff cost
projections. 
Strategic Planning, People and Performance 
4.30 The projected outturn for Strategic Planning and Performance is £116,000
or 1.8% less than budget which represents a favourable movement of
£48,000 due to updated staff cost projections 
Finance and Business Support 
4.31 The projected outturn for Finance and Business Support is currently
anticipated to be £25,000 or 0.2%, a favourable movement of £15,000 due to
updated staff cost projections. 
Scott Street Fire 
4.32 At this time, there are no costs included within the Service monitoring
information in relation to the fire that took place at Scott Street, Perth in June
2025. 
4.33 To date the Council has incurred costs of £841,000, with projections currently
exceeding £3.2 million.

Page 7

4.34 Work continues with insurance companies to recover costs, and the Council
has appointed its own loss adjuster to represent it in the complex discussions. 
Dialogue is ongoing with the Scottish Government in relation to costs that may
not be recoverable. 
4.35 Further updates will be provided to future meetings of the Finance and
Resources Committee. 
Corporate Budgets 
4.36 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings is set out below. 
Health and Social care 
4.37 On 8 October 2025, Perth and Kinross Integration Joint Board considered a
report on the 2025/26 Financial Position, based on financial information to
month five (August 2025) and a financial recovery plan (Report No. G/25/158
refers). 
4.38 The financial recovery plan identified measures that could be delivered in the
current financial year (part A) which are reflected in the projected outturn
below, as well as other measures (part B) which will require further
consideration and may be deliverable over the longer term. 
4.39 The financial update included an updated projected net overspend across the
Health and Social Care Partnership of £4.608 million which is summarised in
the following table and in detail in Appendix 3.  This position remains
consistent with the financial challenges facing health and social care across
Scotland. 
Social
Care
£m 
Health
£m
Health and Social
Care Partnership
£m
Gross Projected Overspend 4.594 1.128 5.722
Application of Remaining
General Reserves
(0.164) - (0.164)
Financial Recovery Actions
- (Part A)
(0.250) (0.700) (0.950)
Net Projected Overspend 4.180 0.428 4.608 
4.40 On 29 October 2025, the Council agreed to provide up to £4.180 million of
additional financial support in 2025/26 (Report No. 25/278 refers).  This
funding will meet the costs associated with high service demand and provide
time to complete the work outlined in part A and B of the Financial Recovery
Plan. 
4.41 The Integration Joint Board will receive comprehensive impact assessments
on the part B options on 17 December 2025.  This information will be shared

Page 8

with elected members at the Council meeting on 14 January 2026 and will be
available for consideration for the 2026/27 Revenue Budget. 
4.42 The Finance and Resources Committee will receive further updates as
information becomes available. 
Funding 
4.43 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
4.44 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
4.45 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 October 2025 together
with prior year comparative figures for the previous five financial years. 
4.46 Between 2020/21 and 2024/25, the average collection figure to 31 October
was 63.64%.  The actual collection figure to 31 October 2025 was 63.65%
which is 0.01% more than the five-year average and 0.11% more than the
comparable position in 2024.

Page 9

4.47 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
4.48 Currently, the level of Council Tax income is projected to be on target against
the budget assumptions which is reflected in Appendix 1. 
Non-Domestic Rates 
4.49 The actual collection rate to 31 October 2025 was 67.13%, compared to
67.43% for the same period in 2024/25.
71,000
72,000
73,000
74,000
75,000
76,000
77,000
01/04/2020
01/07/2020
01/10/2020
01/01/2021
01/04/2021
01/07/2021
01/10/2021
01/01/2022
01/04/2022
01/07/2022
01/10/2022
01/01/2023
01/04/2023
01/07/2023
01/10/2023
01/01/2024
01/04/2024
01/07/2024
01/10/2024
01/01/2025
01/04/2025
01/07/2025
01/10/2025
Council Tax - Number of Band D Equivalent Properties
budget Band D Equivalents

Page 10

Other Updates 
Housing Revenue Account 
4.50 In terms of recurring activity across the Housing Revenue Account, a break-
even position is projected for the current financial year.  The main elements
are summarised below and set out in Appendix 4. 
4.51 Within this projection, there is a reduction in the projected underspend of
£132,000.  This is made up of the additional cost of the 2024/25 pay award
and the purchase of additional environment sensors for tenants’ homes. 
4.52 As a result of this movement, the amount of Capital from Current Revenue will
reduce by £132,000 in the current financial year. 
4.53 In terms of non-recurring activity across the Housing Revenue Account, there
requirement to draw down from the earmarked Reserve has reduced by
£22,000 which is reflected in Appendix 4. 
4.54 The net result of this latest monitoring on Housing Revenue Account Balances
is as follows – 
• HRA unearmarked Reserves - £1 million
• HRA earmarked Reserves - £829,000 
Real Living Wage 
4.55 On 30 October 2024, the Council agreed that in future financial years, any
uplift in the Real Living Wage would be implemented at the earliest possible
date (Council Minute 30 October 2024). 
4.56 On 22 October 2025, the Living Wage Foundation announced an increase in
the Real Living Wage (RLW) rate from £12.60 to £13.45 per hour,
representing a 6.75% increase. 
4.57 As an accredited Real Living Wage Employer, Perth and Kinross Council will
implement the new RLW rate of £13.45 per hour effective from 1 November
2025.  This change will be reflected in the November 2025 payroll, with
payment being made on 28 November 2025. 
4.58 There are 87 employees who will benefit from this increase and the cost to the
Council from 1 November 2025 to 31 March 2026 is £34,317 including
employer on costs. 
5. 2025/26 Revenue Budget Adjustments 
Additional Funding 
5.1 Since elected members were provided with the 2025/26 Revenue Budget
update on 1 October 2025 (Report No. 25/248 refers), notification has been
received of additional resources in the current financial year from several

Page 11

sources as set out below.  To ensure that the 2025/26 Management Budget
continues to reflect the operational requirements of the Council, several
adjustments are required, which are summarised below and included either in
Appendix 1 or Appendix 5. 
Scottish Government – Revenue Support Grant:
• Resettlement Teams (Warm Scottish Welcome): £106,266 (Housing
and Communities)  
• Scottish School Milk Subsidy Scheme £28,000 (Property) 
5.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £134,266 will be made through a redetermination of
the Council’s funding.  It is therefore necessary to adjust budgets for Housing
and Communities, Property and Revenue Support Grant. 
Other Funding 
5.3 Other funding amounting to £1.754 million has been paid outside the
Revenue Support Grant mechanism as Other Grant income and is, therefore,
cost neutral in terms of the budget summary.  Details of this funding is set out
in Appendix 5. 
5.4 ACTION: The Committee is asked to note the receipt of £1.754 million of
additional resources, with this funding being reflected within Economy,
Development and Planning and Environment & Infrastructure as additional
grant income.  The current projected outturn assumes that all these additional
resources will be fully expended in 2025/26 or will be carried forward under
the terms of the grant award. 
Virements 
Contribution to/from Capital Fund 
5.5 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or underspend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund. 
5.6 The latest monitoring indicates a projected increase in capital financing costs
(loan charges) of £222,000 based on the latest treasury management activity
and an increase of £539,000 in income from interest on revenue balances due
to reduced cashflows.  This will result in an increased Contribution to the
Capital Fund of £317,000 in the current financial year.  This is consistent with
the planned use of the Capital Fund to manage the revenue cost of supporting
the Capital budget over the short term. 
5.7 ACTION: The Committee is requested to approve the virement of £222,000 to
the Capital Financing Costs (Loan Charges) Budget and £539,000 to Interest
on Revenue Balances with a corresponding increase in the projected

Page 12

Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 4) to this report. 
Service Virements 
5.8 To ensure that the 2025/26 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 4) that have been
processed in line with the Scheme of Administration. 
Movements In Reserves 
5.9 Included at Appendix 6 is an update on the Council’s General Fund Reserves
which includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2025 (per
unaudited Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2025/26, 2026/27 and 2027/28.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves. 
5.10 The earmarked Reserves are presented under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation, and the Council has limited discretion in
how they are applied. 
ii. Balances held for specific (previously approved) purposes – the purpose
of these earmarked Reserves has been previously approved by Council
in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
5.11 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration. 
Balances Held Under Statute / Regulation 
5.12 There are no adjustments to the earmarked Reserves held under statute or
regulation. 
Balances Held for Specific (Previously Approved) Purposes 
5.13 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts.

Page 13

5.14 Specifically, authority is sought to adjust the following earmarked Reserves
identified below: 
• £38,000 from the Feasibility earmarked Reserve to support economic
development.
• £25,000 to the Community Resilience Reserve as this funding is no longer
required due to partnership working with other local authorities. 
5.15 ACTION: The Committee is asked to approve the transfers from earmarked
Reserves set out in paragraph 5.14 above.  These adjustments are reflected
in Appendix 1 (Column 5) to the report. 
Balances Held for Other Purposes 
5.16 Approval is sought for an adjustment relating to the earmarked Reserve for
Transformation and Workforce Management of £98,000 for the
modernisation of financial systems.   
5.17 ACTION: The Committee is asked to approve the transfer of £98,000 from the
Transformation and Workforce Management to Finance and Business
Support and Education & Learning for staffing. These adjustments are
reflected in Appendix 1 (Column 5) to the report. 
5.18 Approval is sought for an adjustment relating to the earmarked Reserve for
Anti-Poverty of £127,000. 
5.19 ACTION: The Committee is asked to approve the transfer of £127,000 from
the Anti-Poverty Reserve to Strategic Planning, People and Performance.
This adjustment is reflected in Appendix 1 (Column 5) to the report. 
5.20 It is proposed that the Council uses the Communities earmarked Reserve to
apply funding to enhance the standard of annual weed control in Council
managed streets including roundabouts and publicly accessible hard surfaces
in some housing areas.  Part of this will be to trial a growth retardant so as to
not increase the quantity of glyphosate used. 
5.21 Therefore, approval is sought to apply £110,000 from the Communities
earmarked Reserve (two years at £55,000 per annum) to allow the trial to take
place.  Should this be successful this would come back as an expenditure
pressure in future revenue budgets. 
5.22 ACTION: The Committee is asked to approve the transfer of £110,000 from
the Communities earmarked Reserve to Housing and Communities for annual
weed control for two years. This adjustment is reflected in Appendix 1
(Column 5) to the report. 
Unearmarked Reserves 
5.23 Based on the latest information, the level of unearmarked Reserves at
31 March 2026 is projected to be £12.132 million or 2.4%.  This position will
change throughout the financial year as more information becomes available.

Page 14

5.24 There are three reasons for the reduction in both the level and percentage of
unearmarked Reserves.  Firstly, this update assumes a net overspend in the
current year of £339,000 million or 0.1% (there is a risk that this figure
increases).  Secondly, there is a planned contribution from unearmarked
Reserves of £1.989 million or 0.4% (in the 2026/27 and 2027/28 Provisional
Revenue Budgets there is a net contribution of £1.062 million or 0.2% back
to unearmarked Reserves).  Thirdly, the impact of previous decisions,
including the contribution of £4.180 million towards the growing demand in
social care 
5.25 The Reserves Strategy sets out a range of between 2% and 4%. 
6. Financial Risks 
6.1 In preparing the Council's revenue monitoring, officers have considered the
key strategic, operational and financial risks facing the Council over this
period.  Whilst the risks may be managed in the current financial year, there is
the potential for there to be an impact in the future. 
6.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
6.3 Risks are captured within the body of the report with a summary being
maintained in Appendix 8. 
6.4 No new risks have been identified. 
6.5 Going forward, risks to the 2025/26 Revenue Budget and beyond will be
captured with mitigating actions identified. 
7. Conclusion 
7.1 This report provides an update on the financial performance of Perth and
Kinross Council for 2025/26. The report highlights a projected net overspend
of £339,000.  This is after the application of up to £4.180 million to support
the social care pressures in 2025/26. 
7.2 The report also outlines several adjustments to the 2025/26 Revenue Budget,
including additional funding from the Scottish Government and various
virements to ensure the budget aligns with current service needs. 
7.3 Financial risks are identified and mitigated through detailed budget monitoring
and the availability of general fund balances. 
7.4 The latest monitoring indicates that the Council will have unearmarked
General Fund balances of £12.132 million or 2.4% on 31 March 2026. 
7.5 The report recommends approval of the proposed budget adjustments and
notes the importance of continued vigilance in managing financial risks.

Page 15

8. Impact and Value Assessment 
8.1 This is an operational report, and as such, an impact and value assessment is
not required. 
9. Appendices 
Appendix 1 – 2025/26 Management Budget
Appendix 2 – General Fund 2025/26 Projected Outturn – Service Analysis
Appendix 3 – Perth and Kinross Health and Social Care Partnership - 2025/26
Projected Outturns
Appendix 4 – Housing Revenue Account 2025/26 Projected Outturns
Appendix 5 – Other Grant Funding
Appendix 6 – General Fund Reserves Update
Appendix 7 – Council Approved Revenue Budget Flexibility
Appendix 8 – Financial Risks