Appendix II – Composite Capital Programme
Perth and Kinross Council · 1 October 2025
Back to Finance and Resources Committee — 1 October 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Approved Actual Proposed Approved Proposed Proposed Revised Actuals Projected Revised Revised Revised Revised Revised Revised Budget Expenditure Carry Budget Carry Budget Budget to Outturn Budget Budget Budget Budget Budget Budget 30-Apr-25 Forward 30-Apr-25 Forward Adjustment 31-Jul-25 to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2024/25 2024/25 2025/26 2025/26 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) ENVIRONMENT & INFRASTRUCTURE 29,746 26,904 2,842 47,159 2,842 463 50,464 9,095 50,464 37,983 23,180 18,360 16,859 17,778 164,624 HOUSING & COMMUNITIES 1,226 1,237 (11) 5,759 (11) 374 6,122 227 6,122 2,186 1,558 1,500 1,500 950 13,816 ECONOMY, DEVELOPMENT & PLANNING 48,083 35,061 13,022 24,711 13,022 (7,350) 30,383 3,451 30,383 32,555 (3,520) (250) (2,436) 1,186 57,918 PROPERTY SERVICES 60,095 61,071 (976) 59,335 (976) (17,838) 40,521 8,849 40,521 29,566 44,835 39,411 44,050 40,997 239,380 CUSTOMER & DIGITAL SERVICES 8,637 7,958 679 5,709 679 (1,365) 5,023 696 5,023 6,150 10,892 6,312 5,949 8,862 43,188 HEALTH & SOCIAL CARE 1,202 1,284 (82) 1,604 (82) (569) 953 275 953 1,345 1,256 1,435 1,290 1,446 7,725 UNALLOCATED CAPITAL RESOURCES 1,869 0 3,108 4,977 0 4,977 0 0 0 0 6,246 11,223 TOTAL NET EXPENDITURE 148,989 133,515 15,474 146,146 15,474 (23,177) 138,443 22,593 138,443 109,785 78,201 66,768 67,212 77,465 537,874 (NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS) GENERAL CAPITAL GRANT (27,564) (27,564) 0 (11,000) 0 (374) (11,374) (4,200) (11,374) (21,752) (12,750) (12,750) (12,750) (12,750) (84,126) DEVELOPER CONTRIBUTIONS (3,707) (730) (2,977) (2,367) (2,977) 0 (5,344) 0 (5,344) (2,600) (2,600) (2,500) (2,500) (2,000) (17,544) CAPITAL RECEIPTS (357) (347) (10) (1,612) (10) 433 (1,189) (95) (1,189) (235) (2,398) (2,530) (645) (800) (7,797) ANNUAL BORROWING REQUIREMENT 117,361 104,874 12,487 131,167 12,487 (23,118) 120,536 18,298 120,536 85,198 60,453 48,988 51,317 61,915 428,407 CAPITAL RECEIPTS BROUGHT FORWARD (2,102) (2,102) 0 (1,270) 0 (62) (1,332) (1,332) (1,332) (2,614) (2,449) (3,947) (4,577) (5,022) (1,332) CAPITAL RECEIPTS CARRIED FORWARD 1,270 1,332 (62) 2,319 (62) 357 2,614 1,401 2,614 2,449 3,947 4,577 5,022 1,922 1,922 TOTAL NET BORROWING REQUIREMENT 116,529 104,104 12,425 132,216 12,425 (22,823) 121,818 18,367 121,818 85,033 61,951 49,618 51,762 58,815 428,997
Page 2
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget 30-Apr-25 Forward 30-Apr-25 Forward Adjustment 31-Jul-25 to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2024/25 2024/25 2025/26 2025/26 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) ENVIRONMENT & INFRASTRUCTURE Traffic & Road Network Road Safety Initiatives (20mph Zones etc..) 608 685 (77) 472 (77) (6) 389 31 389 362 361 400 400 450 2,362 Scottish Government Grant (383) (377) (6) 0 (6) 5 (1) (1) 0 0 0 0 0 (1) Road Safety Initiatives - A94 Safety Improvements 84 0 84 0 84 84 84 0 0 0 0 0 84 Active Travel Grant -Traffic & Road Safety Schemes 749 632 117 868 117 (2) 983 109 983 600 600 600 600 600 3,983 Third Party Contribution (82) (80) (2) 0 (2) 2 0 0 0 0 0 0 0 0 20mph Signage Programme 47 48 (1) 120 (1) (119) 0 0 120 0 0 0 0 120 Schools Road Safety Measures 182 182 0 0 0 0 1 0 0 0 0 0 0 0 Additional Road Safety - Pedestrian Crossings 65 0 65 181 65 246 246 153 0 0 0 0 399 Traffic Signal Renewals - Upgrading 173 198 (25) 100 (25) 125 200 15 200 0 100 100 100 95 595 Investment in Local Footpaths 0 0 0 20 0 20 20 100 0 0 0 0 120 Car Parking Investment - Pitlochry 230 234 (4) 0 (4) 11 7 7 7 0 0 0 0 0 7 Revenue Contribution (80) (90) 10 0 10 (11) (1) (1) 0 0 0 0 0 (1) A977 Upgrades 5 1 4 173 4 177 177 0 0 0 0 0 177 Broich Road, Crieff - Road Realignment & Safety Measures 0 0 0 18 0 18 18 0 0 0 0 0 18 Sub-Total 1,598 1,433 165 1,952 165 5 2,122 163 2,122 1,335 1,061 1,100 1,100 1,145 7,863 Street Lighting Partnership Street Lighting 0 0 0 0 0 0 0 0 0 600 600 600 1,800 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 600 600 600 1,800 Roads Maintenance Partnership Structural Maintenance 13,193 12,759 434 10,113 434 155 10,702 3,575 10,702 8,963 8,964 8,320 8,320 9,500 54,769 Third Party Contribution (246) (152) (94) 0 (94) (155) (249) (249) 0 0 0 0 0 (249) Revenue Contribution (16) (16) 0 0 0 0 0 0 0 0 0 0 0 Footways 672 633 39 318 39 357 221 357 368 368 341 341 400 2,175 Third Party Contribution 0 0 0 0 0 0 (2) 0 0 0 0 0 0 0 Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 55 55 0 204 0 204 204 0 0 0 0 0 204 Road Safety Barriers 26 26 0 0 0 0 0 0 0 0 0 0 0 Sub-Total 13,684 13,305 379 10,635 379 0 11,014 3,794 11,014 9,331 9,332 8,661 8,661 9,900 56,899 Structures Bridge Refurbishment Programme 1,165 1,009 156 1,778 156 (147) 1,787 82 1,787 1,855 1,836 2,259 2,259 2,603 12,599 Old Perth Bridge - Strengthening 49 36 13 260 13 273 273 2,216 0 0 0 0 2,489 Perth Queens Bridge - Strengthening 59 54 5 154 5 (78) 81 81 371 1,850 0 0 0 2,302 Culteuchar Culvert 22 33 (11) 0 (11) 11 0 (9) 0 0 0 0 0 0 0 Garry Viaduct 46 25 21 321 21 51 393 393 310 1,245 1,720 669 0 4,337 Bolfrack River Retaining Wall 0 0 0 449 0 85 534 534 0 0 0 0 0 534 Bridge of Tilt 0 0 0 620 0 630 1,250 1,250 0 0 0 0 0 1,250 Corb Bridge Culvert, Kinross 0 0 0 353 0 97 450 450 0 0 0 0 0 450 Blairgowrie Bridge 0 0 0 0 0 200 200 200 175 1,000 0 0 0 1,375 Vehicular Bridge Parapets Programme - Assess & Upgrade 1 0 1 33 1 (24) 10 10 24 0 0 0 0 34 Sub-Total 1,342 1,157 185 3,968 185 825 4,978 73 4,978 4,951 5,931 3,979 2,928 2,603 25,370 Flooding Comrie Flood Protection Scheme 6,193 4,681 1,512 21,481 1,512 22,993 2,981 22,993 7,830 0 0 0 0 30,823 Milnathort Flood Protection Scheme 72 8 64 267 64 331 331 0 0 0 0 0 331 South Kinross Flood Protection Scheme 80 78 2 2,121 2 (1,422) 701 229 701 10,296 3,099 75 0 0 14,171 Flood Mitigation Measures - Dunkeld and Craigie Burn 8 10 (2) 72 (2) 194 264 24 264 88 153 340 145 0 990 Investment in Surface Water Management Schemes - Leaky Dam, Rattray Burn0 0 0 27 0 (24) 3 3 48 44 255 0 0 350 Coastal Change Adaptation 48 41 7 52 7 59 59 0 0 0 0 0 59 Almondbank Flood Protection Scheme 0 11 (11) 0 (11) 11 0 88 0 0 0 0 0 0 0 Revenue Contribution 0 (11) 11 0 11 (11) 0 0 0 0 0 0 0 0 Sub-Total 6,401 4,818 1,583 24,020 1,583 (1,252) 24,351 3,322 24,351 18,262 3,296 670 145 0 46,724
Page 3
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget 30-Apr-25 Forward 30-Apr-25 Forward Adjustment 31-Jul-25 to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2024/25 2024/25 2025/26 2025/26 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Climate Change and Zero Waste Climate Change Programme 0 0 0 0 0 215 215 215 530 200 0 0 0 945 Climate Change Unallocated 0 0 0 0 0 329 329 329 0 0 0 0 0 329 Nature Restoration 232 162 70 80 70 49 199 199 0 0 0 0 0 199 Recycling Improvement Fund 98 98 0 0 0 0 0 0 0 0 0 0 0 Scottish Government Grant (98) (98) 0 0 0 0 0 0 0 0 0 0 0 Sub-Total 232 162 70 80 70 593 743 0 743 530 200 0 0 0 1,473 Prudential Borrowing Projects Climate Change and Zero Waste Wheeled Bin Replacement Programme - Domestic Bins 219 191 28 248 28 276 74 276 200 200 220 220 225 1,341 Wheeled Bin Replacement Programme - Commercial Bins 161 110 51 20 51 71 48 71 20 20 25 25 25 186 Recycling in Schools - Waste Bin Purchases 0 0 0 0 0 102 102 102 0 0 0 0 0 102 Recycling Containers, Oil Banks & Battery Banks Replacement Programme163 167 (4) 151 (4) 7 154 154 105 105 70 70 75 579 Capital Receipts - Disposals (6) (9) 3 0 3 (7) (4) (1) (4) 0 0 0 0 0 (4) Litter Bins 35 35 0 65 0 65 65 50 50 55 55 55 330 Direct Services Vehicle Replacement Programme 5,495 5,032 463 5,777 463 160 6,400 1,450 6,400 2,942 2,692 3,311 3,394 3,500 22,239 Capital Receipts - Vehicle Disposals (550) (355) (195) (578) (195) (773) (98) (773) (294) (269) (331) (339) (350) (2,356) Street Lighting Partnership Street Lighting Renewal - LED & Column Replacement 972 858 114 821 114 30 965 270 965 551 562 0 0 0 2,078 Sub Total 6,489 6,029 460 6,504 460 292 7,256 1,743 7,256 3,574 3,360 3,350 3,425 3,530 24,495 TOTAL - ENVIRONMENT & INFRASTRUCTURE 29,746 26,904 2,842 47,159 2,842 463 50,464 9,095 50,464 37,983 23,180 18,360 16,859 17,778 164,624 HOUSING & COMMUNITIES Community Greenspace Community Greenspace Sites 0 0 0 0 0 0 0 0 0 0 700 250 950 Play Areas and Parks 912 902 10 1,223 10 1,233 1,233 1,125 150 500 500 500 4,008 Third Party Contribution (102) (98) (4) (15) (4) (19) (19) 0 0 0 0 0 (19) Revenue Contribution 0 (50) 0 (50) (50) 0 0 0 0 0 (50) 3G Pitch, Blairgowrie 117 83 34 0 34 34 34 0 0 0 0 0 34 Countryside Sites 0 0 0 0 0 0 0 616 139 700 0 0 1,455 Community Greenspace Bridges 88 124 (36) 109 (36) 73 79 73 0 894 0 0 0 967 Third Party Contribution (13) (13) 0 0 0 0 0 0 0 0 0 0 0 Core Path Implementation 110 91 19 0 19 19 19 0 0 0 0 0 19 Third Party Contribution (110) (91) (19) 0 (19) (19) (19) 0 0 0 0 0 (19) Kinnoull Hill 0 0 0 8 0 8 8 0 0 0 0 0 8 Cemetery Extensions 13 13 0 60 0 60 60 445 375 300 300 200 1,680 Sub-Total 1,015 1,011 4 1,335 4 0 1,339 79 1,339 2,186 1,558 1,500 1,500 950 9,033 Improvements New Gypsy Traveller Site 30 54 (24) 1,966 (24) 1,942 1,942 0 0 0 0 0 1,942 Sub Total 30 54 (24) 1,966 (24) 0 1,942 0 1,942 0 0 0 0 0 1,942 Parking, Public Transport Unit and Civil Contingencies Community Transport Iniatives 181 172 9 18 9 27 27 0 0 0 0 0 27 Bus Infrastructure Fund Expenditure 0 0 0 0 0 374 374 374 0 0 0 0 0 374 Sub-Total 181 172 9 18 9 374 401 0 401 0 0 0 0 0 401 Community Learning and Development and Equalities Community-Led Asset Transfers 0 0 0 75 0 75 75 0 0 0 0 0 75 Sub-Total 0 0 0 75 0 0 75 0 75 0 0 0 0 0 75 Prudential Borrowing Projects Parking, Public Transport Unit and Civil Contingencies Community Transport Vehicles 0 0 0 115 0 115 134 115 0 0 0 0 0 115 Kinnoull Street Car Park - Purchase & Upgrade 0 0 0 2,250 0 2,250 14 2,250 0 0 0 0 0 2,250 Sub Total 0 0 0 2,365 0 0 2,365 148 2,365 0 0 0 0 0 2,365 TOTAL - HOUSING & COMMUNITIES 1,226 1,237 (11) 5,759 (11) 374 6,122 227 6,122 2,186 1,558 1,500 1,500 950 13,816
Page 4
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget 30-Apr-25 Forward 30-Apr-25 Forward Adjustment 31-Jul-25 to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2024/25 2024/25 2025/26 2025/26 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) ECONOMY, DEVELOPMENT & PLANNING Roads Infrastructure A9/A85 Road Junction Improvements (PTF Phase 1) 212 343 (131) 0 (131) 145 14 78 14 0 0 0 0 0 14 Destiny Bridge and New Kingsway (PTF Phase 2) 44,745 32,111 12,634 0 12,634 (7,017) 5,617 1,699 5,617 314 0 0 0 0 5,931 Third Party Contribution 0 (168) 168 0 168 168 168 0 0 0 0 0 168 Bertha Park Link Road (PTF Phase 3) 1,013 956 57 9,006 57 249 9,312 1,624 9,312 5,748 0 0 0 0 15,060 Third Party Contribution 0 0 0 0 0 0 0 0 0 0 (1,064) (1,064) Perth Eco-Innovation Park at Perth West 780 672 108 9,737 108 9,845 9,845 22,300 0 0 0 0 32,145 Third Party Contributions - Tay Cities Deal 0 0 0 (550) 0 (550) (550) (505) (3,945) (500) (956) 0 (6,456) Other Third Party Contributions 0 0 0 0 0 0 0 (2,000) (3,000) (1,000) (1,000) (1,000) (8,000) Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 0 0 0 (550) (725) (650) (680) (650) (3,255) Sub-Total 46,750 33,914 12,836 18,193 12,836 (6,623) 24,406 3,401 24,406 0 25,307 (7,670) (2,150) (2,636) (2,714) 34,543 Tourism, Culture and Place Perth, Place, People (PTF Phase 4) 0 0 0 0 0 0 0 3,598 0 0 0 0 3,598 Perth City Centre Golden Route (Rail Station) 23 24 (1) 45 (1) 44 44 0 0 0 0 0 44 City Greening 0 0 0 31 0 31 31 0 0 0 0 0 31 Perth & Kinross Lighting Action Plan 178 145 33 1,142 33 1,175 4 1,175 0 0 0 0 0 1,175 Creative Exchange 0 1 (1) 0 (1) 1 0 0 0 0 0 0 0 0 Low Carbon Transport & Active Travel Hub - Broxden EV Chargers (74) 5 (79) 0 (79) 79 0 46 0 0 0 0 0 0 0 Third Party Contribution - ERDF (2) 1 (3) 0 (3) 3 0 0 0 0 0 0 0 0 Third Party Contribution - Tay Cities Deal 69 (5) 74 0 74 (74) 0 0 0 0 0 0 0 0 Revenue Contribution 7 (1) 8 0 8 (8) 0 0 0 0 0 0 0 0 Adapt Your Property - Vacant Town & City Centre Space 300 210 90 300 90 390 390 300 300 0 0 0 990 Sub-Total 501 380 121 1,518 121 1 1,640 50 1,640 3,898 300 0 0 0 5,838 Commercial Property Investment Programme Tourism, Culture and Place North Muirton Industrial Estate - Site Servicing & Provision of Units 43 11 32 0 32 (32) 0 0 0 0 0 0 0 0 Broxden Business Park - Additional Infrastructure 6 0 6 0 6 (6) 0 0 0 0 0 0 0 0 Western Edge, Kinross - Site Servicing 17 17 0 0 0 0 0 0 0 0 0 0 0 Broxden Drainage Mitigation Works 1,836 1,843 (7) 0 (7) 24 17 17 0 0 0 0 0 17 Third Party Contribution (Scottish Water) (1,072) (1,104) 32 0 32 (32) 0 0 0 0 0 0 0 0 North Muirton Drainage 2 0 2 0 2 (2) 0 0 0 0 0 0 0 0 Mercian Buildings, Shore Road, Perth 0 0 0 0 0 451 451 451 0 0 0 0 0 451 Crioch Business Centre, Crieff 0 0 0 0 0 316 316 316 0 0 0 0 0 316 Northfield Business Park 0 0 0 0 0 2,027 2,027 2,027 0 0 0 0 0 2,027 Northfield Business Park (Phase 2) 0 0 0 0 0 0 0 0 0 800 0 0 800 Northfield Business Park - Site 6 0 0 0 0 0 0 0 0 1,500 0 0 0 1,500 Plot 4 Kinross West 0 0 0 0 0 1,526 1,526 1,526 0 0 0 0 0 1,526 Welton Road SBU's, Blairgowrie 0 0 0 0 0 0 0 200 1,400 0 0 0 1,600 Burnside Street SBU's, Pitlochry 0 0 0 0 0 0 0 600 0 0 0 0 600 Depot SBU's, Blackford 0 0 0 0 0 0 0 0 0 0 200 1,400 1,600 SBU's, Inveralmond Road, Perth 0 0 0 0 0 0 0 900 0 0 0 0 900 Land at South Turfhills Depot, Kinross 0 0 0 0 0 0 0 0 0 1,100 0 0 1,100 Aldour Business Centre, Pitlochry 0 0 0 0 0 0 0 0 0 0 0 900 900 Borlich Business Centre, Aberfeldy 0 0 0 0 0 0 0 0 0 0 0 1,600 1,600 Aberfeldy SBU's 0 0 0 0 0 0 0 700 0 0 0 0 700 Economic Development Investment - Land & Serviced Units* 0 0 0 5,000 0 (5,000) 0 0 0 0 0 0 0 0 * not funded from ring fenced receipts 832 767 65 5,000 65 (728) 4,337 0 4,337 2,400 2,900 1,900 200 3,900 15,637 Prudential Borrowing Projects Tourism, Culture and Place Land Purchase & Development (Hotel Development) 0 0 0 0 0 0 0 950 950 0 0 0 1,900 Sub Total 0 0 0 0 0 0 0 0 0 950 950 0 0 0 1,900 TOTAL - ECONOMY, DEVLOPMENT & PLANNING 48,083 35,061 13,022 24,711 13,022 (7,350) 30,383 3,451 30,383 32,555 (3,520) (250) (2,436) 1,186 57,918
Page 5
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget 30-Apr-25 Forward 30-Apr-25 Forward Adjustment 31-Jul-25 to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2024/25 2024/25 2025/26 2025/26 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) PROPERTY SERVICES Project Support Investment in the Learning Estate 1,761 1,849 (88) 13,050 (88) (11,062) 1,900 352 1,900 2,506 6,823 0 0 0 11,229 Third Party Contribution (170) (170) 0 0 0 0 0 0 0 0 0 0 0 Braco Primary School Upgrade 0 0 0 0 0 150 150 150 350 3,000 5,000 0 0 8,500 School Toilet Upgrade Programme 0 0 0 0 0 400 400 400 0 0 0 0 0 400 Methven Primary School Refurbishment 351 336 15 3,355 15 (670) 2,700 365 2,700 970 0 0 0 0 3,670 Kirkmichael Primary School Upgrades 25 25 0 0 0 0 0 0 0 0 0 0 0 North/West Perth - New Primary School 0 0 0 341 0 341 341 7,672 15,400 0 0 0 23,413 Riverside Primary New School 350 356 (6) 0 (6) 6 0 0 0 0 0 0 0 0 Perth Academy - Refurbishment 3,155 3,329 (174) 1,650 (174) 1,476 741 1,476 194 0 0 0 0 1,670 Perth Grammar School - Upgrade Programme Phase 3 860 941 (81) 1,500 (81) 1,419 1,419 1,628 0 0 0 0 3,047 Perth High School - Internal Services & Refurbishment 12 12 0 0 0 0 0 0 0 0 0 0 0 Perth High School - New School Investment 33,699 34,481 (782) 13,800 (782) 13,018 6,500 13,018 3,600 0 0 0 0 16,618 Pitlochry High School Extension (Pitlochry Leisure Review) 0 0 0 0 0 200 200 200 750 5,000 2,750 0 0 8,700 Harris Academy/Invergowrie - Extension 591 565 26 0 26 26 26 0 0 0 0 0 26 Blairgowrie Recreation Centre - Replacement 14,027 14,098 (71) 2,603 (71) 2,532 34 2,532 0 0 0 0 0 2,532 Technology Upgrades 115 117 (2) 771 (2) (519) 250 250 483 519 0 0 0 1,252 Community School of Auchterarder (FSM) 0 0 0 1,000 0 (1,000) 0 0 250 750 2,511 0 0 3,511 Community Campus Access Adaptations 0 0 0 25 0 25 25 0 0 0 0 0 25 Sub-Total 54,776 55,939 (1,163) 38,095 (1,163) (12,495) 24,437 7,992 24,437 18,403 31,492 10,261 0 0 84,593 Property Service Management DDA Adaptation & Alteration Works Programme 110 77 33 320 33 353 55 353 200 200 0 0 0 753 Property Compliance Works Programme 1,067 1,058 9 600 9 609 102 609 650 400 0 0 0 1,659 Capital Improvement Projects Programme 2,400 2,285 115 1,665 115 1,780 96 1,780 1,800 894 10,000 9,600 11,000 35,074 Pitlochry High School - Upgrade Programme 130 144 (14) 34 (14) 20 20 0 0 0 0 0 20 Friarton Depot - Waste Transfer Station 250 260 (10) 2,531 (10) (221) 2,300 41 2,300 221 0 0 0 0 2,521 Energy Efficiency Works - Various Properties 36 36 0 0 0 0 0 0 0 0 0 0 0 Revenue Contribution (Salix Reserve) (36) (36) 0 0 0 0 0 0 0 0 0 0 0 Letham Community Wellbeing Hub 95 83 12 0 12 326 338 149 338 0 0 0 0 0 338 PH2O 160 153 7 2,000 7 (1,707) 300 26 300 1,700 2,000 10,000 30,000 29,847 73,847 Bells Sport Centre 0 0 0 0 0 500 500 500 1,500 1,500 3,500 3,000 0 10,000 Kinross Community Campus Sports Facilities 0 0 0 0 0 0 0 900 5,000 1,000 0 0 6,900 Crieff Community Campus Sports Facilities 0 0 0 0 0 0 0 0 1,000 4,000 1,300 0 6,300 Crieff Drummond Arms - Regeneration 55 58 (3) 2,945 (3) (1,442) 1,500 189 1,500 1,442 0 0 0 0 2,942 Perth Concert Hall 0 0 0 395 0 395 395 1,000 1,000 500 0 0 2,895 Perth Museum 167 54 113 0 113 113 12 113 0 0 0 0 0 113 Sub-Total 4,434 4,172 262 10,490 262 (2,544) 8,208 670 8,208 9,413 11,994 29,000 43,900 40,847 143,362 Prudential Borrowing Projects Decarbonisation 739 811 (72) 600 (72) 528 528 0 0 0 0 0 528 Energy Conservation & Carbon Reduction Programme 146 148 (2) 150 (2) 41 189 24 189 150 150 150 150 150 939 Third Party Contribution 0 0 0 0 (41) (41) (41) 0 0 0 0 0 (41) Pullar House - Purchase & Re-Purposing 0 1 (1) 10,000 (1) (2,799) 7,200 163 7,200 1,600 1,199 0 0 0 9,999 Sub-Total 885 960 (75) 10,750 (75) (2,799) 7,876 187 7,876 1,750 1,349 150 150 150 11,425 TOTAL - PROPERTY SERVICES 60,095 61,071 (976) 59,335 (976) (17,838) 40,521 8,849 40,521 29,566 44,835 39,411 44,050 40,997 239,380 CUSTOMER & DIGITAL SERVICES ICT Infrastructure Replacement and Upgrade Programme 5,300 4,798 502 2,739 502 (580) 2,661 610 2,661 4,118 8,605 4,110 3,547 7,001 30,042 Data & Analytics 600 546 54 1,206 54 (532) 728 37 728 845 849 854 890 621 4,787 Third Party Contribution 0 (5) 5 0 5 5 5 0 0 0 0 0 5 Supporting Digital 750 898 (148) 1,175 (148) (90) 937 937 1,037 989 1,122 1,153 736 5,974 Software Licences (Revenues & Benefits) 51 52 (1) 51 (1) 50 50 51 49 0 0 0 150 School Audio-Visual (AV) Equipment Replacement Programme 111 103 8 35 8 (16) 27 2 27 26 27 226 359 504 1,169 Mosaic - Swift Social Work System Replacement 1,723 1,555 168 437 168 54 659 47 659 197 497 0 0 0 1,353 Revenue Contribution 0 0 0 (124) 0 (124) (124) (124) (124) 0 0 0 (372)
Page 6
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget 30-Apr-25 Forward 30-Apr-25 Forward Adjustment 31-Jul-25 to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 2024/25 2024/25 2025/26 2025/26 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Hardware 22 8 14 15 14 (29) 0 0 0 0 0 0 0 0 Licenses 80 3 77 95 77 (172) 0 0 0 0 0 0 0 0 Case Management System 0 0 0 80 0 80 80 0 0 0 0 0 80 TOTAL - CUSTOMER & DIGITAL SERVICES 8,637 7,958 679 5,709 679 (1,365) 5,023 696 5,023 6,150 10,892 6,312 5,949 8,862 43,188 HEALTH & SOCIAL CARE Occupational Therapy Equipment 650 694 (44) 250 (44) 44 250 115 250 250 150 250 100 256 1,256 Technology Enabled Telecare 500 538 (38) 1,043 (38) (355) 650 160 650 1,042 1,037 1,115 1,120 1,120 6,084 Moving & Handling Office Refurbishment 0 0 0 29 0 (29) 0 0 0 0 0 0 0 0 Software Licences 52 52 0 53 0 53 53 53 69 70 70 70 385 Developing Supported Tenancies 0 0 0 229 0 (229) 0 0 0 0 0 0 0 0 TOTAL - HEALTH & SOCIAL CARE 1,202 1,284 (82) 1,604 (82) (569) 953 275 953 1,345 1,256 1,435 1,290 1,446 7,725 Unallocated Capital Resources 0 0 1,869 0 3,108 4,977 4,977 0 0 0 0 6,246 11,223 TOTAL COMPOSITE NET EXPENDITURE 148,989 133,515 15,474 # 146,146 15,474 (23,177) 138,443 22,593 138,443 109,785 78,201 66,768 67,212 77,465 537,874 (NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS) CAPITAL INCOME & RECEIPTS General Capital Grant - Scottish Government (27,564) (27,564) 0 (11,000) 0 (374) (11,374) (4,200) (11,374) (21,752) (12,750) (12,750) (12,750) (12,750) (84,126) Developer Contributions (3,707) (730) (2,977) (2,367) (2,977) (5,344) (5,344) (2,600) (2,600) (2,500) (2,500) (2,000) (17,544) General Fund - Capital Receipts/Disposal (357) (350) (7) (563) (7) (570) (26) (570) 0 0 0 0 0 (570) Commercial Property - Capital Receipts/Disposal 0 3 (3) (1,049) (3) 433 (619) (69) (619) (235) (2,398) (2,530) (645) (800) (7,227) Total: Capital Receipts (31,628) (28,641) (2,987) (14,979) (2,987) 59 (17,907) (4,295) (17,907) (24,587) (17,748) (17,780) (15,895) (15,550) (109,467) Annual Composite Borrowing Requirement 117,361 104,874 12,487 131,167 12,487 (23,118) 120,536 18,298 120,536 85,198 60,453 48,988 51,317 61,915 428,407 CAPITAL RECEIPTS BROUGHT FORWARD (2,102) (2,102) 0 (1,270) 0 (62) (1,332) (1,332) (1,332) (2,614) (2,449) (3,947) (4,577) (5,022) (1,332) CAPITAL RECEIPTS CARRIED FORWARD 1,270 1,332 (62) 2,319 (62) 357 2,614 1,401 (2,386) 2,449 3,947 4,577 5,022 1,922 (7,078) TOTAL NET COMPOSITE BORROWING REQUIREMENT 116,529 104,104 12,425 132,216 12,425 (22,823) 121,818 18,367 116,818 85,033 61,951 49,618 51,762 58,815 419,997
Page 7
Project Project Description Traffic & Road Network Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety Road Safety Initiatives - A94 Safety Improvements A programme of works to improve road safety on the A94 Active Travel Grant - Traffic & Road Safety Schemes A programme of works to improve active travel 20mph Signage Programme A programme of works to introduce 20mph speed limits. Schools Road Safety Measures A programme of works to improve road safety in the vicinity of schools Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal infrastructure Investment in Local Footpaths A programme of works to improve and provide local footpaths Car Parking Investment - Pitlochry Purchase of land and construction of a public car park A977 Upgrades A programme of works to improve road safety along the A977. Broich Road, Crieff - Road Realignment & Safety Measures Realignment of Broich Road, Burrell Street and Gallowhill Junction Street Lighting Partnership Street Lighting Replacement of existing street lighting lanterns, columns and cable network. Roads Maintenance Partnership Structural Maintenance Road maintenance to extend the life of roads, including predominately road resurfacing, surface dressings, installing new drainage infrastructure and repairs to and replacement of defective embankments and retaining walls Footways Replacement of existing deteriorated footway surfaces Perth Flood Protection Scheme (South Inch Culvert Reinstatement) Ground investigation and monitoring then design project to refurbish existing culvert Road Safety Barriers Renewal of existing barriers where unrecoverable damage has occurred and renewal of barriers where timber posts have been used in construction Bridges Bridge Refurbishment Programme Used to appoint specialist external inspection teams and consultants to carry out specialist access bridge inspections and assessments Old Perth Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a range of assessment, investigation, strengthening and improvement works ENVIRONMENT & INFRASTRUCTURE
Page 8
Project Project Description Perth Queens Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a range of assessment, investigation, strengthening and improvement works Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert Garry Viaduct Replacement of Bearings and Parapets; including strengthening of deck for bearing replacement jacking up, and to cater for increased parapet vehicular deterrent capacity Bolfrack River Retaining Wall Replacement of failed section of retaining wall supporting A827 adjacent to River Tay Bridge of Tilt Repairs to masonry bridge and installation of major scour mitigation measures Corb Bridge Culvert, Kinross Installation of structural lining to dilapidated culvert Blairgowrie Bridge Major scour mitigation scheme Vehicular Bridge Parapets Programme - Assess & Upgrade Assessment and Upgrading of Vehicle Parapets Programme Flooding Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Comrie Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Milnathort South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in South Kinross Flood Mitigation Measures - Dunkeld and Craigie Burn Design and construction of schemes to reduce the risk of flooding in Dunkeld and Craigie Burn Investment in Surface Water Management Schemes - Leaky Dam, Rattray Burn Design and construction of a natural flood management measure (Leaky Dam) to reduce the risk of flooding in Rattray Coastal Change Adaptation Design and construct projects to deal with incidents of coastal erosion Climate Change and Zero Waste Climate Change Programme A programme of projects to meet the priorities to deliver the Top and High Priority Projects in the Council's Climate Change Strategy and Action Plan. Proposed projects will be scrutinised by the Council's Climate Change and Sustainabliltiy Group
Page 9
Project Project Description Nature Restoration Protection and restoration of biodiversity focusing on over-exploitation of the natural environment and addressing its consequences; habitat loss and fragmentation; and invasive non-native species. Prudential Borrowing Projects Wheeled Bin Replacement Programme - Domestic Bins Replacement of damaged and end of life wheeled bins for households. Also suppling bins for new properties Wheeled Bin Replacement Programme - Commercial Bins Replacement of damaged and end of life wheeled bins for commercial customers. Also suppling bins for new customers and changes to collection contracts Recycling in Schools - Waste Bin Purchases This project will improve the recycling infrastrucuture in PKC learning establishments and will improve positive behaviours with staff and pupils. Recycling Containers, Oil Banks & Battery Banks Replacement Programme Replacement of damaged and end of life oil and battery banks Litter Bins Replacement of damaged and end of life litter bins and/or for general supply of litter bins where required. Vehicle Replacement Programme Fleet vehicle replacement programme Street Lighting Renewal - LED & Column Replacement Street Lighting LED conversion and column replacement programme Community Greenspace Community Greenspace Sites Main fund for all Community Greenspace Sites which is drawn down to support the overall capital programme of refurbishments and upgrades Play Areas and Parks Refurbishment of 'Settlement and Neighbourhood' classification parks working in partnership with communities to improve, update and renew worn out or obsolete infrastructure. Small budget to facilitate refurbishment of former Premier Park upgrades 3G Pitch, Blairgowrie Two phase community led project to provide a new full sized 3G football pitch and pavilion Countryside Sites Refurbishment of more natural parks and open spaces Community Greenspace Bridges Refurbishment programme for all bridges on Community Greenspace sites HOUSING & COMMUNITIES
Page 10
Project Project Description Core Path Implementation Holding budget for Crieff Comrie Core path development mainly funded through Sustrans Kinnoull Hill Complete Cemetery Extensions Funding to allow the extension of existing or development of new cemeteries to address the pressure for burial space Improvements New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site Parking, Public Transport Unit and Civil Contingencies Community Transport Iniatives Purchase of vehicles and charging infrastructure for community transport/resilience groups to use to deliver on unmet need in the local area. Bus Infrastructure Fund Improving the infrastructure needed to operate buses Community Learning and Development and Equalities Community-Led Asset Transfers Financial assistance for community groups wishing to take on PKC assets using the community asset transfer process Prudential Borrowing Projects Community Transport Vehicles Providing vehicles to community transport groups Kinnoull Street Car Park - Purchase Purchase of Kinnoull Street Multi-Storey Car Park to increase Perth and Kinross Council car parking capacity to support delivery of the Perth City Integrated Investment Proposal Roads Infrastructure A9/A85 Road Junction Improvements (PTF Phase 1) New infrastructure including a new A9 overbridge, a bridge over the River Almond and road linking the A85 to Inveralmond and Bertha Park (Phase 1 of Perth Transport Futures Project) Destiny Bridge and New Kingsway (PTF Phase 2) New road and major structure over the River Tay, linking the A9 north of Inveralmond and the A94 north of Scone (Phase 2 of Perth Transport Futures Project) ECONOMY, DEVELOPMENT & PLANNING
Page 11
Project Project Description Bertha Park Link Road (PTF Phase 3) Phase 3 of Perth Transport Futures Project which is a new link road (1.4km) running through Bertha Park, connecting Phases 1 and 2. Perth Eco-Innovation Park at Perth West Provision of enabling infrastructure (access road, A9 underpass and unit platforms) to develop 25ha of employment land supporting clean growth, business innovation and jobs - Phase 1 (11ha). Tourism, Culture and Place Perth, Place, People (PTF Phase 4) Design and development of sustainable transport corridors to improve access to and from Perth and enable additional development and improvement within Perth city centre Perth City Centre Golden Route (Rail Station) Design and development of improvements to access, signage and animation from rail and bus station to Perth city centre to complement improvements to integration of transport City Greening Improvements to support enhancement of retail trading environment and residential areas and enhanced use of space for markets, events and alfresco use Perth & Kinross Lighting Action Plan Architectural and creative lighting to enhance city and towns appearance, reduce energy cost and increase safety at nighttime to increase dwell time, support the hospitality sector, events and grow the evening economy Low Carbon Transport & Active Travel Hub - Broxden EV Chargers Provision of fast EV chargers combined with solar power generation and battery storage at Broxden Park & Ride - Near completion Adapt Your Property - Vacant Town & City Centre Space Adapt Your Property supports capital adaptation works to empty and underused commercial property in city & town centres, looking at adaptation to attract new commercial, community or residential use. Other Planning Projects Local Full Fibre Network Provision of gigabit fibre connectivity to Council's buildings to unlock gigabit connectivity for surrounding communities. Complete Commercial Property Investment Programme Capital investment in economic development in serviced units and land Prudential Borrowing Project
Page 12
Project Project Description Land Purchase & Development (Hotel Development) This scheme involves the redevelopment of 1-5 High Street as serviced apartments courtesy of a heritage grant funding award that includes disposal to a developer subject to conclusion of a development agreement Project Support Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our existing school estate Braco Primary School Upgrade Replacement school on adjacent land School Toilet Upgrade Programme Major toilet upgrades in various schools Methven Primary School Refurbishment Upgrade of Methven Primary School facilities including new dining and gym hall North/West Perth - New Primary School New primary school located at Bertha Park Riverside Primary New School Replacement of North Muirton and Balhousie primary schools Perth Academy - Refurbishment Investment to upgrade the infrastructure and environment of the Perth Academy including structural work to sports block, lighting upgrades, classroom upgrades and science block cladding Perth Grammar School - Upgrade Programme Phase 3 Investment to upgrade the infrastructure and environment of the Perth Grammar School including structural work to assembly hall, AV and WiFi upgrades, classroom refurbishment and door upgrades Perth High School - New School Investment Replacement of the existing Perth High School Pitlochry High School Extension (Pitlochry Leisure Review) Creation of community campus including sports facilities including 4 court sports hall and associated works Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy in Dundee for continuation of access for pupils based in Invergowrie Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie Technology Upgrades Upgrade to practical teaching environment within the existing school estate Community School of Auchterarder (FSM) Upgrading kitchen and dining facilities to provide the enhanced Free School Meals programme Community Campus Access Adaptations To support adaptations in schools and community campuses to help facilitate increased community access PROPERTY SERVICES
Page 13
Project Project Description Property Service Management DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council Buildings - e.g. Ramps/Lifts/Door Access/Accessible Toilets and Changing Areas Property Compliance Works Programme To ensure compliance with current and changing legislation including - New Fire Alarms; Lighting; Wiring; Fire Protection Works; Gas pipework within buildings and Roof Restraint safety systems Capital Improvement Projects Programme Roof Upgrades; Full internal refurbishment works; New Heating Systems; Boilers and pipework; Structural Upgrades; Small extensions; New Windows/Doors; New Fencing; New Cladding Pitlochry High School - Upgrade Programme Upgrades to Mechanical and Electrical Infrastructure, including rewiring, heating and controls systems, replacement lighting and consequential building works such as new ceilings, painting and flooring Friarton Depot - Waste Transfer Station This project aims to refurbish the main waste transfer station building to provide a safe environment for workers. The project will involve a complete re-cladding of the existing structure, new doors and new services installation. Some initial enabling work are being carried out currently. Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to reduce energy cost across the property estate Letham Community Wellbeing Hub Complete PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink. Bells Sport Centre Development of Bells' as an unheated, covered sports pitch and events space Kinross Community Campus Sports Facilities Improvements to the building fabric and energy efficiency of Live Active Loch Leven Crieff Community Campus Sports Facilities Improvements to the building fabric and energy efficiency of Strathearn Community Campus Leisure Facilities Crieff Drummond Arms - Regeneration Demolition of former hotel, regeneration of site for housing use Perth Museum Redevelopment of former Perth City Hall to New Perth Museum Prudential Borrowing Projects Decarbonisation This budget will support PKCs path to NetZero and focus primarily on the de- carbonisation of heat and replacing inefficient direct emissions heat sources
Page 14
Project Project Description Energy Conservation & Carbon Reduction Programme This budget is focused on works to reduce PKC energy consumption and help achieve annual KPI energy reduction of 3% Pullar House - Purchase & Re-Purposing Purchase and development of Pullar House to create a shared Public Sector Hub Customer & Digital Services ICT Infrastructure & Replacement and Upgrade Programme This Programme delivers the IT / digital environment, digital resources and systems required by staff and young people. The programme maintains, supports and develops computers; networks; telephony; Microsoft systems; connectivity and equipment; datacentres; servers; file storage and back up; security systems and video conferencing Data & Analytics Delivers the governance, tools, technologies and organisation-wide skills required for optimising value from Council data, driving informed decision making around resources, priorities and service delivery targets Supporting Digital Develops the capabilities we need to be an innovative digital organisation. Including developing the Council’s corporate employee (mobile working) and customer (online services) platforms, to create new digital products and services; investment in tools such as Microsoft; resourcing innovation and building digital skills, insight and expertise Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team School Audio-Visual (AV) Equipment Replacement Programme Ensures all Perth and Kinross classrooms have equitable access to audio visual panels and the digital skills to exploit these resources for learning and teaching Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system to replace SWIFT Hardware Funding of additional or bespoke IT Hardware for Communities Staff Licenses Funding of software contracts Case Management System New system for management of client cases Occupational Therapy Equipment Supply and install of occupational therapy equipment following referral from heakth and social care professionals. HEALTH & SOCIAL CARE
Page 15
Project Project Description Technology Enabled Telecare Replacement of existing analogue Community Alarm devices to digital alarm units prior to UK switch-off of analogue network, as well as ongoing rolling replacement programme. Moving & Handling Office Refurbishment Relocate staff base, currently under review Software Licences Various licences for essential social care systems Developing Supported Tenancies Contribution towards flagship core and cluster facility for adults with learning disabilities’