Appendix II – Composite Capital Programme - Summary of Capital Resources and Expenditure 2024/25 to 2029/30
Perth and Kinross Council · 30 April 2025
Back to Finance and Resources Committee — 30 April 2025 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Approved Approved Proposed Revised Actuals Projected Revised Revised Revised Revised Revised Revised Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget 05-Feb-25 Adjustment Adjustment 31-Jan-25 Report 3 26-Feb-25 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) ENVIRONMENT & INFRASTRUCTURE 30,810 (50) (1,014) 29,746 19,981 29,746 47,159 36,181 23,948 18,606 16,603 172,243 HOUSING & COMMUNITIES 1,829 0 (603) 1,226 651 1,226 3,509 2,186 1,558 1,500 1,500 11,479 ECONOMY, DEVELOPMENT & PLANNING 50,868 0 (2,785) 48,083 26,818 48,083 24,711 28,968 (4,420) (2,150) (2,636) 92,556 PROPERTY SERVICES 68,812 0 (8,717) 60,095 48,989 60,095 61,585 53,838 49,867 35,650 22,990 284,025 CUSTOMER & DIGITAL SERVICES 8,347 0 290 8,637 3,027 8,637 5,709 5,227 10,196 8,502 5,925 44,196 HEALTH & SOCIAL CARE 1,062 0 140 1,202 664 1,202 1,604 1,345 1,256 1,320 1,170 7,897 UNALLOCATED CAPITAL RESOURCES 52 0 (52) 0 0 0 1,869 0 0 0 0 1,869 TOTAL NET EXPENDITURE 161,780 (50) (12,741) 148,989 100,130 148,989 146,146 127,745 82,405 63,428 45,552 614,265 (NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS) GENERAL CAPITAL GRANT (26,928) 1 (637) (27,564) (24,370) (27,564) (11,000) (21,752) (12,750) (12,750) (12,750) (98,566) DEVELOPER CONTRIBUTIONS (3,707) 0 0 (3,707) 0 (3,707) (2,367) (2,600) (2,600) (2,500) (2,500) (16,274) CAPITAL RECEIPTS (1,126) 0 769 (357) (376) (357) (1,612) 0 (1,088) 0 0 (3,057) ANNUAL BORROWING REQUIREMENT 130,019 (49) (12,609) 117,361 75,384 117,361 131,167 103,393 65,967 48,178 30,302 496,368 CAPITAL RECEIPTS BROUGHT FORWARD (2,102) 0 0 (2,102) (2,102) (2,102) (1,271) (2,320) (2,320) (3,408) (3,407) (2,102) CAPITAL RECEIPTS CARRIED FORWARD 1,120 (1) 151 1,270 228 1,270 2,320 2,320 3,408 3,408 3,407 3,407 TOTAL NET BORROWING REQUIREMENT 129,037 (50) (12,458) 116,529 73,510 116,529 132,216 103,393 67,055 48,178 30,302 497,673
Page 2
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Adjustment Adjustment 31-Jan-25 Report 3 26-Feb-25 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) ENVIRONMENT & INFRASTRUCTURE Traffic & Road Safety Road Safety Initiatives (20mph Zones etc..) 718 (110) 608 78 608 472 362 361 400 400 2,603 Scottish Government Grant (383) (383) (383) 0 0 0 0 0 (383) Road Safety Initiatives - A94 Safety Improvements 84 84 84 0 0 0 0 0 84 Active Travel Grant -Traffic & Road Safety Schemes 816 (67) 749 342 749 868 600 600 600 600 4,017 Third Party Contribution (77) (5) (82) (82) 0 0 0 0 0 (82) Additional Road Safety - Pedestrian Crossings 60 5 65 65 181 153 0 0 0 399 Schools Road Safety Measures 122 60 182 181 182 0 0 0 0 0 182 20mph Signage Programme - Schools 128 (128) 0 3 0 0 0 0 0 0 0 20mph Signage Programme 39 8 47 30 47 120 0 0 0 0 167 Car Parking Investment - Pitlochry 205 25 230 101 230 0 0 0 0 0 230 Revenue Contribution (55) (25) (80) (55) (80) 0 0 0 0 0 (80) Sub-Total 1,657 0 (237) 1,420 680 1,420 1,641 1,115 961 1,000 1,000 7,137 Asset Management - Roads & Lighting Structural Maintenance 13,347 (154) 13,193 10,551 13,193 10,113 8,963 8,964 8,320 8,320 57,873 Third Party Contribution (262) 16 (246) (114) (246) 0 0 0 0 0 (246) Revenue Contribution 0 (16) (16) (16) (16) 0 0 0 0 0 (16) Traffic Signal Renewals - Upgrading 173 173 129 173 100 100 100 100 100 673 Footways 622 50 672 574 672 318 368 368 341 341 2,408 Street Lighting 0 0 0 0 0 0 600 600 1,200 Investment in Local Footpaths 0 0 0 20 100 0 0 0 120 Road Safety Barriers 22 4 26 26 26 0 0 0 0 0 26 Sub-Total 13,902 0 (100) 13,802 11,150 13,802 10,551 9,531 9,432 9,361 9,361 62,038 Asset Management - Bridges Bridge Refurbishment Programme 1,283 (118) 1,165 665 1,165 1,778 2,162 3,201 2,500 2,500 13,306 Vehicular Bridge Parapets Programme - Assess & Upgrade 1 1 1 33 0 0 0 0 34 Old Perth Bridge - Strengthening 155 (106) 49 29 49 260 2,216 0 0 0 2,525 Perth Queens Bridge - Strengthening 59 59 45 59 154 343 1,800 0 0 2,356 Garry Viaduct 46 46 15 46 321 515 1,790 1,690 0 4,362 Bolfrack River Retaining Wall 0 0 0 449 0 0 0 0 449 Bridge of Tilt 0 0 0 620 0 0 0 0 620 Corb Bridge Culvert, Kinross 0 0 0 353 0 0 0 0 353 Culteuchar Culvert 13 9 22 14 22 0 0 0 0 0 22 Sub-Total 1,557 0 (215) 1,342 768 1,342 3,968 5,236 6,791 4,190 2,500 24,027 Improvement Schemes A977 Upgrades 5 5 1 5 173 0 0 0 0 178 Broich Road, Crieff - Road Realignment & Safety Measures 0 0 0 18 0 0 0 0 18 Sub-Total 5 0 0 5 1 5 191 0 0 0 0 196 Rural Flood Protection Schemes Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 259 (204) 55 50 55 204 0 0 0 0 259 Comrie Flood Protection Scheme 6,193 6,193 1,919 6,193 21,481 7,830 0 0 0 35,504 Milnathort Flood Protection Scheme 72 72 2 72 267 0 0 0 0 339 South Kinross Flood Protection Scheme 239 (159) 80 64 80 2,121 8,823 3,150 75 0 14,249 Scone Flood Protection Scheme 50 (50) 0 0 0 0 0 0 0 0 0 Flood Mitigation Measures - Dunkeld and Craigie Burn 8 8 8 8 72 48 180 375 317 1,000 Investment in Surface Water Management Schemes - Leaky Dam, Rattray Burn0 0 0 27 24 44 255 0 350 Coastal Change Adaptation 48 48 30 48 52 0 0 0 0 100 Sub-Total 6,869 (50) (363) 6,456 2,073 6,456 24,224 16,725 3,374 705 317 51,801 Climate Change Nature Restoration 232 232 28 232 80 0 0 0 0 312 Sub-Total 232 0 0 232 28 232 80 0 0 0 0 312 Waste Strategy Recycling Improvement Fund 98 98 98 98 0 0 0 0 0 98 Scottish Government Grant (98) (98) (98) (98) 0 0 0 0 0 (98) Sub-Total 0 0 0 0 0 0 0 0 0 0 0 0
Page 3
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Adjustment Adjustment 31-Jan-25 Report 3 26-Feb-25 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Prudential Borrowing Projects Wheeled Bin Replacement Programme - Domestic Bins 267 (48) 219 158 219 248 200 200 220 220 1,307 Wheeled Bin Replacement Programme - Commercial Bins 161 161 104 161 20 20 20 25 25 271 Recycling Containers, Oil Banks & Battery Banks Replacement Programme209 (46) 163 144 163 151 105 105 70 70 664 Capital Receipts - Disposals (2) (4) (6) (5) (6) 0 0 0 0 0 (6) Litter Bins 50 (15) 35 8 35 65 50 50 55 55 310 Vehicle Replacement Programme 5,495 5,495 4,466 5,495 5,777 2,942 2,692 3,311 3,394 23,611 Capital Receipts - Vehicle Disposals (550) (550) (246) (550) (578) (294) (269) (331) (339) (2,361) Street Lighting Renewal - LED & Column Replacement 958 14 972 652 972 821 551 592 0 0 2,936 Sub Total 6,588 0 (99) 6,489 5,281 6,489 6,504 3,574 3,390 3,350 3,425 26,732 TOTAL - ENVIRONMENT & INFRASTRUCTURE 30,810 (50) (1,014) 29,746 19,981 29,746 47,159 36,181 23,948 18,606 16,603 172,243 HOUSING & COMMUNITIES Community Greenspace Play Areas - Improvements Implementation Strategy 641 641 156 641 898 855 150 500 500 3,544 Third Party Contribution (4) (4) (4) (15) 0 0 0 0 (19) Revenue Contribution 0 0 0 (50) 0 0 0 0 (50) 3G Pitch, Blairgowrie 117 117 83 117 0 0 0 0 0 117 Settlement/Neighbourhood Parks 250 (15) 235 202 235 315 270 0 0 0 820 Third Party Contribution (84) (84) (84) (84) 0 0 0 0 0 (84) Countryside Sites 0 0 0 0 0 139 0 0 139 Community Greenspace Sites 0 0 0 0 616 894 700 700 2,910 Community Greenspace Bridges 197 (109) 88 122 88 109 0 0 0 0 197 Third Party Contribution (13) (13) (13) (13) 0 0 0 0 0 (13) Core Path Implementation 110 110 12 110 0 0 0 0 0 110 Third Party Contribution (110) (110) (110) 0 0 0 0 0 (110) Premier Parks 46 (10) 36 32 36 10 0 0 0 0 46 Third Party Contribution (14) (14) (10) (14) 0 0 0 0 0 (14) Kinnoull Hill 8 (8) 0 0 8 0 0 0 0 8 Cemetery Extensions 13 13 13 13 60 445 375 300 300 1,493 Sub-Total 1,157 0 (142) 1,015 513 1,015 1,335 2,186 1,558 1,500 1,500 9,094 Housing Projects Gypsy Travellers Site Improvement Works 185 (185) 0 2 0 0 0 0 0 0 0 Additional Gypsy Traveller Site Improvement Works 225 (225) 0 30 0 0 0 0 0 0 0 New Gypsy Traveller Site 6 24 30 30 1,966 0 0 0 0 1,996 Sub Total 416 0 (386) 30 32 30 1,966 0 0 0 0 1,996 Public Transport Community Transport Iniatives 181 181 106 181 18 0 0 0 0 199 Sub-Total 181 0 0 181 106 181 18 0 0 0 0 199 Prudential Borrowing Projects Community Transport Vehicles 0 0 0 115 0 0 0 0 115 Sub Total 0 0 0 0 0 0 115 0 0 0 0 115 Community Planning Community-Led Asset Transfers 75 (75) 0 0 75 0 0 0 0 75 Sub-Total 75 0 (75) 0 0 0 75 0 0 0 0 75 TOTAL - HOUSING & COMMUNITIES 1,829 0 (603) 1,226 651 1,226 3,509 2,186 1,558 1,500 1,500 11,479 ECONOMY, DEVELOPMENT & PLANNING Improvement Schemes A9/A85 Road Junction Improvements 212 212 19 212 0 0 0 0 0 212 Cross Tay Link Road (CTLR) 44,745 44,745 23,822 44,745 0 0 0 0 0 44,745 Bertha Park Link Road 686 327 1,013 627 1,013 9,006 2,875 0 0 0 12,894 Sub-Total 45,643 0 327 45,970 24,468 45,970 9,006 2,875 0 0 0 57,851
Page 4
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Adjustment Adjustment 31-Jan-25 Report 3 26-Feb-25 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Perth & Kinross Place-making Perth, Place, People 0 0 0 0 3,598 0 0 0 3,598 Perth City Centre Golden Route (Rail Station) 23 23 24 23 45 0 0 0 0 68 City Greening 0 0 0 31 0 0 0 0 31 Perth & Kinross Lighting Action Plan 476 (298) 178 90 178 1,142 0 0 0 0 1,320 Sub-Total 499 0 (298) 201 114 201 1,218 3,598 0 0 0 5,017 Other Planning Projects Local Full Fibre Network 0 0 0 0 0 0 0 0 0 Third Party Contribution - Tay Cities Deal 0 0 (53) 0 0 0 0 0 0 0 Low Carbon Transport & Active Travel Hub - Broxden EV Chargers (74) (74) 5 (74) 0 0 0 0 0 (74) Third Party Contribution - ERDF (2) (2) (2) 0 0 0 0 0 (2) Third Party Contribution - Tay Cities Deal 69 69 69 0 0 0 0 0 69 Revenue Contribution 7 7 7 0 0 0 0 0 7 Perth Eco-Innovation Park at Perth West 780 780 332 780 9,737 22,300 0 0 0 32,817 Third Party Contributions - Tay Cities Deal 0 0 0 (550) (505) (3,945) (500) (956) (6,456) Other Third Party Contributions 0 0 0 0 (2,000) (3,000) (1,000) (1,000) (7,000) Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 (550) (725) (650) (680) (2,605) Adapt Your Property - Vacant Town & City Centre Space 300 300 9 300 300 300 300 0 0 1,200 Sub-Total 1,080 0 0 1,080 293 1,080 9,487 19,545 (7,370) (2,150) (2,636) 17,956 Commercial Property Investment Programme North Muirton Industrial Estate - Site Servicing & Provision of Units 43 43 11 43 0 0 0 0 0 43 Broxden Business Park - Additional Infrastructure 6 6 6 0 0 0 0 0 6 Western Edge, Kinross - Site Servicing (17) 34 17 17 17 0 0 0 0 0 17 Broxden Drainage Mitigation Works 1,225 611 1,836 1,915 1,836 0 0 0 0 0 1,836 Third Party Contribution (Scottish Water) (919) (153) (1,072) (1,072) 0 0 0 0 0 (1,072) Ruthvenfield Business Centre 1,356 (1,356) 0 0 0 0 0 0 0 0 North Muirton Drainage 2 2 2 0 0 0 0 0 2 Economic Development Investment - Land & Serviced Units* 1,000 (1,000) 0 0 5,000 2,000 2,000 0 0 9,000 * not funded from ring fenced receipts 2,696 0 (1,864) 832 1,943 832 5,000 2,000 2,000 0 0 9,832 Prudential Borrowing Projects Land Purchase & Development (Hotel Development) 950 (950) 0 0 0 950 950 0 0 1,900 Sub Total 950 0 (950) 0 0 0 0 950 950 0 0 1,900 TOTAL - ECONOMY, DEVLOPMENT & PLANNING 50,868 0 (2,785) 48,083 26,818 48,083 24,711 28,968 (4,420) (2,150) (2,636) 92,556 PROPERTY SERVICES Project Support Investment in the Learning Estate 1,591 170 1,761 1,164 1,761 13,050 8,650 6,823 0 0 30,284 Third Party Contribution 0 (170) (170) (170) 0 0 0 0 0 (170) Methven Primary School Refurbishment 206 145 351 61 351 3,355 300 0 0 0 4,006 Kirkmichael Primary School Upgrades 25 25 25 25 0 0 0 0 0 25 North/West Perth - New Primary School 0 0 0 341 7,672 15,400 0 0 23,413 Riverside Primary New School 483 (133) 350 329 350 0 0 0 0 0 350 Perth Academy - Refurbishment 3,050 105 3,155 2,647 3,155 1,650 194 0 0 0 4,999 Perth Grammar School - Upgrade Programme Phase 3 1,000 (140) 860 644 860 1,500 1,628 0 0 0 3,988 Perth High School - Internal Services & Refurbishment 12 12 12 0 0 0 0 0 12 Perth High School - New School Investment 40,899 (7,200) 33,699 27,058 33,699 13,800 3,600 0 0 0 51,099 Harris Academy/Invergowrie - Extension 591 591 152 591 0 0 0 0 0 591 Blairgowrie Recreation Centre - Replacement 15,327 (1,300) 14,027 13,347 14,027 2,603 0 0 0 0 16,630 Technology Upgrades 115 115 86 115 771 483 0 0 0 1,369 Sub-Total 63,299 0 (8,523) 54,776 45,513 54,776 37,070 22,527 22,223 0 0 136,596 Project & Contracts Free School Meal Expansion Programme 0 0 0 1,000 2,511 0 0 0 3,511 Community Campus Access Adaptations 0 0 0 25 0 0 0 0 25 Sub-Total 0 0 0 0 0 0 1,025 2,511 0 0 0 3,536 Property Service Manager DDA Adaptation & Alteration Works Programme 130 (20) 110 34 110 320 200 200 0 0 830 Property Compliance Works Programme 1,017 50 1,067 794 1,067 600 650 400 0 0 2,717 Capital Improvement Projects Programme 2,265 135 2,400 1,602 2,400 1,665 1,800 894 10,000 10,000 26,759 Pitlochry High School - Upgrade Programme 104 26 130 97 130 34 0 0 0 0 164 Friarton Depot - Waste Transfer Station 250 250 193 250 2,531 0 0 0 0 2,781
Page 5
PERTH AND KINROSS COUNCIL COMPOSITE CAPITAL PROGRAMME SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30 APPENDIX II Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget Adjustment Adjustment 31-Jan-25 Report 3 26-Feb-25 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 2024/25 2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) Energy Efficiency Works - Various Properties 36 36 23 36 0 0 0 0 0 36 Revenue Contribution (Salix Reserve) (36) (36) (36) 0 0 0 0 0 (36) Letham Community Wellbeing Hub 95 95 8 95 0 0 0 0 0 95 PH2O 500 (340) 160 160 2,000 25,000 25,000 25,000 12,840 90,000 Crieff Drummond Arms - Regeneration 0 55 55 1 55 2,945 0 0 0 0 3,000 Perth Concert Hall 0 0 0 395 1,000 1,000 500 0 2,895 Perth Museum 167 167 167 0 0 0 0 0 167 Perth Art Gallery 100 (100) 0 0 0 0 0 0 0 0 Sub-Total 4,628 0 (194) 4,434 2,752 4,434 10,490 28,650 27,494 35,500 22,840 129,408 Prudential Borrowing Projects Decarbonisation 739 739 607 739 600 0 0 0 0 1,339 Energy Conservation & Carbon Reduction Programme 146 146 117 146 150 150 150 150 150 896 Pullar House - Purchase & Re-Purposing 0 0 0 10,000 0 0 0 0 10,000 Kinnoull Street Car Park - Purchase 0 0 0 2,250 0 0 0 0 2,250 Sub-Total 885 0 0 885 724 885 13,000 150 150 150 150 14,485 TOTAL - PROPERTY SERVICES 68,812 0 (8,717) 60,095 48,989 60,095 61,585 53,838 49,867 35,650 22,990 284,025 CUSTOMER & DIGITAL SERVICES ICT Infrastructure Replacement and Upgrade Programme 4,927 373 5,300 1,622 5,300 2,739 3,273 7,698 6,472 3,687 29,169 Data & Analytics 600 600 28 600 1,206 720 708 716 733 4,683 Supporting Digital 750 750 162 750 1,175 928 1,185 914 920 5,872 Software Licences (Revenues & Benefits) 51 51 52 51 51 51 49 0 0 202 School Audio-Visual (AV) Equipment Replacement Programme 125 (14) 111 232 111 35 106 35 300 485 1,072 Mosaic - Swift Social Work System Replacement 1,712 11 1,723 925 1,723 437 188 560 0 0 2,908 Revenue Contribution 0 0 0 (124) (124) (124) 0 0 (372) Hardware 22 22 6 22 15 14 14 25 25 115 Licenses 80 80 80 95 71 71 75 75 467 Case Management System 80 (80) 0 0 80 0 0 0 0 80 TOTAL - CUSTOMER & DIGITAL SERVICES 8,347 0 290 8,637 3,027 8,637 5,709 5,227 10,196 8,502 5,925 44,196 HEALTH & SOCIAL CARE Occupational Therapy Equipment 650 650 248 650 250 250 150 250 100 1,650 Technology Enabled Telecare 360 140 500 402 500 1,043 1,042 1,037 1,000 1,000 5,622 Moving & Handling Office Refurbishment 0 0 0 29 0 0 0 0 29 Software Licences 52 52 14 52 53 53 69 70 70 367 Developing Supported Tenancies 0 0 0 229 0 0 0 0 229 TOTAL - HEALTH & SOCIAL CARE 1,062 0 140 1,202 664 1,202 1,604 1,345 1,256 1,320 1,170 7,897 Unallocated Capital Resources 52 (52) 0 0 1,869 0 0 0 0 1,869 TOTAL COMPOSITE NET EXPENDITURE 161,780 (50) (12,741) 148,989 100,130 148,989 146,146 127,745 82,405 63,428 45,552 614,265 (NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS) CAPITAL INCOME & RECEIPTS General Capital Grant - Scottish Government (26,928) 1 (637) (27,564) (24,370) (27,564) (11,000) (21,752) (12,750) (12,750) (12,750) (98,566) Developer Contributions (3,707) (3,707) (3,707) (2,367) (2,600) (2,600) (2,500) (2,500) (16,274) General Fund - Capital Receipts/Disposal (413) 56 (357) (307) (357) (563) 0 0 0 0 (920) Commercial Property - Capital Receipts/Disposal (713) 713 0 (69) 0 (1,049) 0 (1,088) 0 0 (2,137) Total: Capital Receipts (31,761) 1 132 (31,628) (24,746) (31,628) (14,979) (24,352) (16,438) (15,250) (15,250) (117,897) Annual Composite Borrowing Requirement 130,019 (49) (12,609) 117,361 75,384 117,361 131,167 103,393 65,967 48,178 30,302 496,368 CAPITAL RECEIPTS BROUGHT FORWARD (2,102) 0 (2,102) (2,102) (2,102) (1,270) (2,319) (2,319) (3,407) (3,407) (2,102) CAPITAL RECEIPTS CARRIED FORWARD 1,120 (1) 151 1,270 228 1,270 2,319 2,319 3,407 3,407 3,407 3,407 TOTAL NET COMPOSITE BORROWING REQUIREMENT 129,037 (50) (12,458) 116,529 73,510 116,529 132,216 103,393 67,055 48,178 30,302 497,673
Page 6
Project Project Description ENVIRONMENT & INFRASTRUCTURE Traffic & Road Safety Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety Road Safety Initiatives - A94 Safety Improvements A programme of works to improve road safety Active Travel Grant - Traffic & Road Safety Schemes A programme of works to improve active travel Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities Schools Road Safety Measures A programme of works to improve road safety in the vicinity of schools 20mph Signage Programme - Schools A programme of works to improve road safety in the vicinity of schools 20mph Signage Programme A programme of works to introduce 20mph speed limits. Car Parking Investment - Pitlochry Purchase of land and construction of a public car park Roads & Lighting Structural Maintenance Road maintenance to extend the life of roads, including predominately road resurfacing, surface dressings, installing new drainage infrastructure and repairs to and replacement of defective embankments and retaining walls Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal infrastructure Footways Replacement of existing deteriorated footway surfaces Street Lighting Replacement of existing street lighting lanterns, columns and cable network. Investment in Local Footpaths A programme of works to improve and provide local footpaths Road Safety Barriers Renewal of existing barriers where unrecoverable damage has occurred and renewal of barriers where timber posts have been used in construction Bridges Bridge Refurbishment Programme Used to appoint specialist external inspection teams and consultants to carry out specialist access bridge inspections and assessments Vehicular Bridge Parapets Programme - Assess & Upgrade Assessment and Upgrading of Vehicle Parapets Programme Old Perth Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a range of assessment, investigation, strengthening and improvement works Perth Queens Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a range of assessment, investigation, strengthening and improvement works Garry Viaduct Replacement of Bearings and Parapets; including strengthening of deck for bearing replacement jacking up, and to cater for increased parapet vehicular deterrent capacity Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert Improvement Schemes A977 Upgrades A programme of works to improve road safety along the A977. Broich Road, Crieff - Road Realignment & Safety Measures Complete Rural Flood Protection Schemes Perth Flood Protection Scheme (South Inch Culvert Reinstatement) Ground investigation and monitoring then design project to refurbish existing culvert Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Comrie Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Milnathort South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in South Kinross Scone Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Scone Flood Mitigation Measures - Dunkeld and Craigie Burn Design and construction of schemes to reduce the risk of flooding in Dunkeld and Craigie Burn Coastal Change Adaptation Design and construct projects to deal with incidents of coastal erosion Climate Change Nature Restoration Protection and restoration of biodiversity focusing on over-exploitation of the natural environment and addressing its consequences; habitat loss and fragmentation; and invasive non-native species. Waste Strategy Recycling Improvement Fund Complete Prudential Borrowing Projects Wheeled Bin Replacement Programme - Domestic Bins Replacement of damaged and end of life wheeled bins for households. Also suppling bins for new properties Wheeled Bin Replacement Programme - Commercial Bins Replacement of damaged and end of life wheeled bins for commercial customers. Also suppling bins for new customers and changes to collection contracts Recycling Containers, Oil Banks & Battery Banks Replacement Programme Replacement of damaged and end of life oil and battery banks Litter Bins Replacement of damaged and end of life litter bins and/or for general supply of litter bins where required. Vehicle Replacement Programme Fleet vehicle replacement programme
Page 7
Project Project Description Street Lighting Renewal - LED & Column Replacement Street Lighting LED conversion and column replacement programme HOUSING & COMMUNITIES Community Greenspace Play Areas - Improvements Implementation Strategy Regular refurbishment of 146 play areas based on approx. 6-8 per year. Involves community engagement and often co-funding and design of the sites 3G Pitch, Blairgowrie Two phase community led project to provide a new full sized 3G football pitch and pavilion Settlement/Neighbourhood Parks Refurbishment of neighbourhood parks working in partnership with communities to improve, update and renew worn out or obsolete infrastructure Countryside Sites Refurbishment of more natural parks and open spaces Community Greenspace Sites Main fund for all Community Greenspace Sites which is drawn down to support the overall capital programme of refurbishments and upgrades Community Greenspace Bridges Refurbishment programme for all bridges on Community Greenspace sites Core Path Implementation Holding budget for Crieff Comrie Core path development mainly funded through Sustrans Premier Parks Small budget to facilitate refurbishment of former Premier Park upgrades Kinnoull Hill Complete Cemetery Extensions Funding to allow the extension of existing or development of new cemeteries to address the pressure for burial space Housing Projects Gypsy Travellers Site Improvement Works Programme of works for improvements on Gypsy Traveller sites at Bobbin Mill and Double Dykes Additional Gypsy Traveller Site Improvement Works Additional funding to support improvements works programme on Gypsy Traveller sites New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site Public Transport Community Transport Iniatives Purchase of vehicles and charging infrastructure for community transport/resilience groups to use to deliver on unmet need in the local area. Community Planning Community-Led Asset Transfers Financial assistance for community groups wishing to take on PKC assets using the community asset transfer process ECONOMY, DEVELOPMENT & PLANNING Improvement schemes A9/A85 Road Junction Improvements New infrastructure including a new A9 overbridge, a bridge over the River Almond and road linking the A85 to Inveralmond and Bertha Park (Phase 1 of Perth Transport Futures Project) - Complete Cross Tay Link Road (CTLR) New road and major structure over the River Tay, linking the A9 north of Inveralmond and the A94 north of Scone (Phase 2 of Perth Transport Futures Project). Bertha Park Link Road Phase 3 of Perth Transport Futures Project which is a new link road (1.4km) running through Bertha Park, connecting Phases 1 and 2. Status - specimen design underway. Perth & Kinross Place-making Perth, Place, People Design and development of sustainable transport corridors to improve access to and from Perth and enable additional development and improvement within Perth city centre Perth City Centre Golden Route (Rail Station) Design and development of improvements to access, signage and animation from rail and bus station to Perth city centre to complement improvements to integration of transport City Greening Improvements to support enhancement of retail trading environment and residential areas and enhanced use of space for markets, events and alfresco use Perth & Kinross Lighting Action Plan Architectural and creative lighting to enhance city and towns appearance, reduce energy cost and increase safety at nighttime to increase dwell time, support the hospitality sector, events and grow the evening economy Other Planning Projects Creative Exchange (former St. John's Primary School) Repurposing old school to offer space to creative industry businesses and create the Famous Grouse Idea Centre, a space to support business innovation. Complete Local Full Fibre Network Provision of gigabit fibre connectivity to Council's buildings to unlock gigabit connectivity for surrounding communities. Complete Low Carbon Transport & Active Travel Hub - Broxden EV Chargers Provision of fast EV chargers combined with solar power generation and battery storage at Broxden Park & Ride - Near completion
Page 8
Project Project Description Perth Eco-Innovation Park at Perth West Provision of enabling infrastructure (access road, A9 underpass and unit platforms) to develop 25ha of employment land supporting clean growth, business innovation and jobs - Phase 1 (11ha). Economic Development Investment - Land & Serviced Units Provision of serviced lands and business units - Additional business units (eg Northfields Business Park and Kinross Business Park) - procurement for design in progress followed by construction. Adapt Your Property - Vacant Town & City Centre Space Adapt Your Property supports capital adaptation works to empty and underused commercial property in city & town centres, looking at adaptation to attract new commercial, community or residential use. Commercial Property Investment Programme North Muirton Industrial Estate - Site Servicing & Provision of Units Only road adoption works remaining Broxden Business Park - Additional Infrastructure Only road adoption works remaining Western Edge, Kinross - Site Servicing Only road adoption works remaining Broxden Drainage Mitigation Works Drainage/pumping station works underway and subject to agreement/contribution from Scottish Water Ruthvenfield Business Centre Works on redevelopment in progress North Muirton Drainage Drainage/pumping station underway Prudential Borrowing Project Land Purchase & Development (Hotel Development) Development agreement secured and release of grant for heritage subject to progression through planning and cost evidence STRATEGY, PEOPLE & RESOURCES Property Services - Project Support Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our existing school estate Methven Primary School Refurbishment Upgrade of Methven Primary School facilities Kirkmichael Primary School Upgrades Upgrade of Kirkmichael Primary School facilities North/West Perth - New Primary School New primary school located at Bertha Park Riverside Primary New School Replacement of North Muirton and Balhousie primary schools Perth Academy - Refurbishment Investment to upgrade the infrastructure and environment of the Perth Academy including structural work to sports block, lighting upgrades, classroom upgrades and science block cladding Perth Grammar School - Upgrade Programme Phase 3 Investment to upgrade the infrastructure and environment of the Perth Grammar School including structural work to assembly hall, AV and WiFi upgrades, classroom refurbishment and door upgrades Perth High School - Internal Services & Refurbishment Necessary works to the infrastructure and environment of the current Perth High School Perth High School - New School Investment Replacement of the existing Perth High School Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy in Dundee for continuation of access for pupils based in Invergowrie Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie Technology Upgrades Upgrade to practical teaching environment within the existing school estate Property Services - Projects & Contracts Free School Meal Expansion Programme Upgrading kitchen and dining facilities to provide the enhanced Free School Meals programme Community Campus Access Adaptations To support adaptations in schools and community campuses to help facilitate increased community access Property Services - Property Service Manager DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council Buildings - e.g. Ramps/Lifts/Door Access/Accessible Toilets and Changing Areas Property Compliance Works Programme To ensure compliance with current and changing legislation including - New Fire Alarms; Lighting; Wiring; Fire Protection Works; Gas pipework within buildings and Roof Restraint safety systems Capital Improvement Projects Programme Roof Upgrades; Full internal refurbishment works; New Heating Systems; Boilers and pipework; Structural Upgrades; Small extensions; New Windows/Doors; New Fencing; New Cladding Pitlochry High School - Upgrade Programme Upgrades to Mechanical and Electrical Infrastructure, including rewiring, heating and controls systems, replacement lighting and consequential building works such as new ceilings, painting and flooring Friarton Depot - Waste Transfer Station This project aims to refurbish the main waste transfer station building to provide a safe environment for workers. The project will involve a complete re-cladding of the existing structure, new doors and new services installation. Some initial enabling work are being carried out currently. Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to reduce energy cost across the property estate Letham Community Wellbeing Hub Complete
Page 9
Project Project Description PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink. On hold pending outcome of Leisure and Culture Assets Review Crieff Drummond Arms - Regeneration Demolition of former hotel, regeneration of site for housing use Perth Museum Complete Perth Art Gallery Refurbishment of temporary galleries - scheduled for completion November 2023 Prudential Borrowing Projects Decarbonisation This budget will support PKCs path to NetZero and focus primarily on the de- carbonisation of heat and replacing inefficient direct emissions heat sources Energy Conservation & Carbon Reduction Programme This budget is focused on works to reduce PKC energy consumption and help achieve annual KPI energy reduction of 3% Pullar House - Purchase & Re-Purposing Purchase and development of Pullar House to create a shared Public Sector Hub Kinnoull Street Car Park - Purchase Purchase of Kinnoull Street Multi-Storey Car Park to increase Perth and Kinross Council car parking capacity to support delivery of the Perth City Integrated Investment Proposal Customer & Digital Services ICT Infrastructure & Replacement and Upgrade Programme This Programme delivers the IT / digital environment, digital resources and systems required by staff and young people. The programme maintains, supports and develops computers; networks; telephony; Microsoft systems; connectivity and equipment; datacentres; servers; file storage and back up; security systems and video conferencing Data & Analytics Delivers the governance, tools, technologies and organisation-wide skills required for optimising value from Council data, driving informed decision making around resources, priorities and service delivery targets Supporting Digital Develops the capabilities we need to be an innovative digital organisation. Including developing the Council’s corporate employee (mobile working) and customer (online services) platforms, to create new digital products and services; investment in tools such as Microsoft; resourcing innovation and building digital skills, insight and expertise Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team School Audio-Visual (AV) Equipment Replacement Programme Ensures all Perth and Kinross classrooms have equitable access to audio visual panels and the digital skills to exploit these resources for learning and teaching Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system to replace SWIFT Hardware Funding of additional or bespoke IT Hardware for Communities Staff Licenses Funding of software contracts Case Management System New system for management of client cases HEALTH & SOCIAL CARE Occupational Therapy Equipment Supply and install of occupational therapy equipment following referral from heakth and social care professionals. Technology Enabled Telecare Replacement of existing analogue Community Alarm devices to digital alarm units prior to UK switch-off of analogue network, as well as ongoing rolling replacement programme. Moving & Handling Office Refurbishment Relocate staff base, currently under review Software Licences Various licences for essential social care systems Developing Supported Tenancies Contribution towards flagship core and cluster facility for adults with learning disabilities’