Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequalities 
Council Building
2 High Street
Perth
PH1 5PH 
29/01/2025 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 05 February 2025 at 13:00. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Stewart Donaldson  (Convener)
Councillor Grant Laing  (Vice-Convener)
Bailie Chris Ahern
Councillor Peter Barrett
Councillor Andy Chan
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor John Duff
Councillor David Illingworth
Provost Xander McDade
Councillor Tom McEwan
Bailie Claire McLaren
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Page 1 of 88

Page 2

Page 2 of 88

Page 3

Finance and Resources Committee 
Wednesday, 05 February 2025 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTES   
3(i)  MINUTE OF MEETING OF THE FINANCE AND RESOURCES
COMMITTEE OF 20 NOVEMBER 2025  FOR APPROVAL
(copy herewith) 
5 - 8 
3(ii)  MINUTE OF MEETING OF THE EMPLOYEES JOINT
CONSULTATIVE COMMITTEE OF 17 JUNE 2024 FOR NOTING
(copy herewith) 
9 - 14 
3(iii)  MINUTE OF MEETING OF THE EMPLOYEES JOINT
CONSULTATIVE COMMITTEE OF 16 SEPTEMBER 2024 FOR
NOTING
(copy herewith) 
15 - 20 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 25/23) 
21 - 22 
5 REVENUE BUDGET 2024/25 - UPDATE NO. 3
Report by Chief Finance Officer (copy herewith 25/24) 
23 - 58 
6 COMPOSITE CAPITAL BUDGET 2024/30 AND HOUSING
INVESTMENT PROGRAMME 2024/29 – MONITORING REPORT
NO.3
Report by Chief Finance Officer (copy herewith 25/25) 
59 - 88 
Page 3 of 88

Page 4

Page 4 of 88

Page 5

Finance and Resources Committee 
Minute of hybrid meeting of the Finance and Resources Committee held in the
Council Chamber, 2 Hight Street, Perth on Wednesday 20 November 2024 at
1.00pm. 
Present: Councillors S Donaldson and G Laing; Bailie C McLaren; Provost
X McDade, Depute Provost A Parrott; and Councillors H Anderson (substituting for
Bailie C Ahern), P Barrett, A Chan, D Cuthbert, E Drysdale, J Duff, D Illingworth,
T McEwan, J Rebbeck, C Shiers and C Stewart. 
In Attendance: T Glen, Chief Executive; C Mailer, Depute Chief Executive; J Pepper,
Chief Officer – Health and Social Care Partnership, D Mitchell, Chief Finance Officer,
Health and Social Care Partnership; S Walker, Strategic Lead - Finance and
Business Support; A O’Brien, S Coyle, C France, J Jennings, C Palmer,
C Robertson and J Salisbury (all Finance and Business Support); S Crawford,
Strategic Lead – Property Services; J Janes (Property Services); D Littlejohn,
Strategic Lead – Economy, Development and Planning; S Merone and A Seggie
(both Economy, Development and Planning); E Ritchie – Strategic Lead - Housing
and Communities; N Ballentine (Housing and Communities); F Crofts, Strategic Lead
- Environment and Infrastructure; A Clegg and P Leonard (both Environment and
Infrastructure); A Taylor, Strategic Lead – Customer and Digital Services; K Fraser
(Customer and Digital Services); L Simpson, Strategic Lead – Legal and
Governance; K Molley, A Brown and M Pasternak (all Legal and Governance); 
Apology: Bailie C Ahern 
Councillor S Donaldson, Convener, Presiding. 
The Convener Led on items 1-4 and 6-7. The Vice-Convener led on items 5 and 8. 
1. Welcome and Apologies 
The Convener welcomed all those present to the meeting and an apology was
noted as above. 
2. Declarations of Interest 
In terms of the Councillors’ Code of Conduct, Councillor J Duff declared an
interest in item 5. 
3. Minute of Meeting of the Finance and Resources Committee of
18 September 2024 
The minute of meeting of the Finance and Resources Committee of
18 September 2024 was submitted and approved as a correct record. 
4. Outstanding Business Statement 
Resolved:
The status of action in the Outstanding Business Statement (24/317) be noted
and completed actions removed accordingly.
3(i)
Page 5 of 88

Page 6

5. Revenue Budget 2024/25 - Update No. 2 
There was submitted a report by the Chief Finance Officer (24/318) providing
an update on progress with the 2024/25 General Fund Revenue Budget based upon
the August 2024 ledger, updated for any subsequent known material movements,
and the projected financial position of the Housing Revenue Account. 
Resolved:
(i) The contents of Report 24/318, be noted.
(ii) The projected outturn for General Fund Services, as set out in Section 5 of
Report 24/318 and Appendices 1 and 2, be noted.
(iii) The projected outturn for Corporate Budgets, as set out in Section 6 of Report
24/318, be noted.
(iv) The funding update, provided in Section 7 of Report 24/318, be noted.
(v) The projected outturn for the Housing Revenue Account, as summarised in
Section 8 of Report 24/318 and Appendix 4, be noted.
(vi) the adjustments to the 2024/25 Management Revenue Budget, as detailed in
Sections 9,10 & 11 of Report 24/318 and Appendices 1, 2, 4, 5, 6, and 7, be
approved.
(vii) The financial risks, as set out in Section 12 of Report 24/318 and Appendix 8,
be noted.
(viii) To underwrite the Crannog Centre with a financial contribution of up to
£50,000 from unearmarked Reserves which will only be paid if required and
this is delegated to the Chief Finance Officer to ensure that everything is in
order. 
6. Composite Capital Budget 2024/30 & Housing Investment Programme
2024/29 - Monitoring Report No. 2 
There was submitted a report by the Chief Finance Officer (24/319) (1)
providing a summary position to date for the 6-year Composite Capital Budget for
2024/25 to 2029/30 and the 5-year Housing Investment Programme for 2024/25 to
2028/29; and (2) seeking approval for adjustments to the programmes. 
Resolved:
(i) The contents of Report 24/319 be noted.
(ii) The proposed adjustments to the six-year Composite Capital Budget 2024/25
to 2029/30, as set out in Sections 5 and 6 of Report 24/319 and summarised
in Appendices I and II, be approved.
(iii) The proposed adjustments to the Housing Investment Programme Budget
2024/25 to 2028/29, as set out in Section 7 of Report 24/319 and summarised
in Appendix III, be approved.
(iv) Progress with the delivery of major Capital projects, as summarised in
Appendix IV to Report 24/319, be noted. 
7. Treasury Activity and Compliance Report 2023/24 – 6 Months to
30 September 2024 
There was submitted a report by the Chief Finance Officer (24/320) (1)
providing an update on Treasury Activity for the period 1 April to 30 September 2024;
and (2) reporting on compliance with the Council’s Treasury Management Policy
Statement (TMPS), Investment Strategy and Prudential Indicators. 
Page 6 of 88

Page 7

Resolved:
The contents of Report 24/320, be noted. 
8. Drummond Arms, Crieff 
There was submitted a report by the Strategic Lead – Economy, Development
and Planning (24/321) providing an update on the status of the Listed former
Drummond Arms Hotel in Crieff which has laid empty since 2006 and added to the
Buildings at Risk Register for Scotland in 2012. 
Resolved:
(i) The current status of the former Drummond Arms Hotel and the intention of
Drummond Arms Regeneration Ltd to wind-up the company, be noted.
(ii) It be agreed to acquire the building at nil value and mitigate the public safety
risk in compliance with the Dangerous Buildings Notice.
(iii) Officers be instructed to apply for Listed Building Consent and Building
Warrant to demolish the structure.
(iv) It be agreed to allocate up to £3 million from the 2025/26 Capital Budget to
cover the demolition costs.
(v) Officers be instructed to prepare a development plan for the provision of a
flatted affordable housing development in line with the Council’s Corporate
Asset Management Strategy.
(vi) Section 5.3 be revised to ‘undertakes full demolition works to eliminate the
risks posed’.
(vii) Officers be instructed to prepare a report to the Scrutiny and Performance
Committee on a review of the Drummond Arms Hotel. The scope of the
review to be widened to look at the Council’s role in funding community led
projects. 
Page 7 of 88

Page 8

Page 8 of 88

Page 9

Perth and Kinross Council
Finance and Resources Committee
Employees Joint Consultative Committee 
Minute of hybrid meeting of the Employees Joint Consultative Committee held in the
Council Chambers, 2 High Street, Perth on Monday 17 June 2024 at 2.00pm. 
Present: Representing Perth and Kinross Council: 
Councillors B Leishman, S McCole and J Rebbeck. 
Present: Representing Trade Unions: 
S Hope (UNISON) (Item 6 onwards)
N Ferry (UNISON)
C Weston (EIS) (Up to Item 9)
K Currie (Unite the Union)
J Kettle (SSTA) (Up to Item 9) 
In Attendance:  L Hamilton, P Johnstone, L McGeorge, F Thomson, and J Guild (all
Strategy, People and Resources); F MacKay (Economy, Place and
Learning). 
Apologies:   Councillor C Reid, S Robertson, V Leonard and S Topen-Cooper, 
Councillor S McCole in the Chair. 
1. Welcome and Apologies 
Councillor McCole welcomed all present to the meeting and apologies were
noted as above. 
2. Declarations of Interest 
There were no declarations of interest made in terms of the Councillors’ Code
of Conduct. 
3. Minute of Meeting of the Employees Joint Consultative Committee of
18 March 2024 for Approval 
The minute of meeting of the Employees Joint Consultative Committee of
18 March 2024 was submitted and approved as a correct record. 
4. Matters Arising 
There were no matters arising. 
5. Health and Safety Performance Report Quarter 4 – 2023/24 
There was a report submitted by Strategic Lead – Strategic Planning, People
and Performance (G/24/80) informing and assisting the Employees Joint
3(ii)
Page 9 of 88

Page 10

Consultative Committee in monitoring health and safety compliance and
performance across Perth and Kinross Council and providing an overview of
health and safety activities undertaken. 
In response to a question from Councillor Leishman regarding historical verbal
abuse at housing locality offices, L Hamilton advised that the majority of
incidents are within schools and while there is no specific concern for other
areas, management tools are in place to support staff as appropriate. 
In response to a question from Councillor McCole re updated staff training for
incident de-escalation, L Hamilton confirmed there are plans being
established for face to face de-escalation training to be developed within the
next calendar year. 
Resolved:
The contents of Report G/24/80, be noted. 
S HOPE JOINED THE MEETING AT THIS POINT. 
6. Fire Safety Quarterly Report – Quarter 4 – 2023/24 
There was a report submitted by Strategic Lead – Strategic Planning, People
and Performance (G/24/81) informing and assisting the Employees Joint
Consultative Committee in monitoring fire safety performance across Perth
and Kinross Council and providing an overview of fire safety activities
undertaken. 
In response to a question from Councillor McCole regarding public awareness
of safe battery disposal, L Hamilton advised that Waste Services are working
to produce communications to educate the public on correct disposal of
batteries. 
Resolved:
The contents of Report G/24/81, be noted. 
7. Proposed New Health and Safety Consultative Service Committees 
L Hamilton, Health and Safety Team Leader, provided a verbal update on the
replacement of service level Health and Safety Committees within Perth and
Kinross Council.  L Hamilton advised the current three committees will merge
to form one committee going forward, as a reflection of the structural change
within the organisation.  L Hamilton added that the format of reporting to
EJCC may change as a result, and there will be a transition period as the
merge takes place, however historic data will remain available. 
In response to a request from Councillor McCole for the Convener and Vice
Convener to be kept up to date regarding any change in to reporting to the
EJCC, L Hamilton agreed this would be accommodated. 
The Committee noted the update.  
Page 10 of 88

Page 11

8. Property Services Highlight Report 
There was submitted a report by the Strategic Lead – Property Services
(G/24/82) informing the Employees Joint Consultative Committee on current
Property Services monitoring and management arrangements which are in
place to ensure the safety of all building users and members of the public who
have access to Council buildings and associated facilities.   
Resolved:
The contents of Report G/24/82, be noted. 
9. Staff Reporting: Incidents of Violence/Aggression and Incidents of
Distressed/Challenging Behaviour in Education Settings, Term 3 –
2023/24 
There was a report submitted by the Strategic Lead – Education and Learning
(G/24/83) informing the Employees Joint Consultative Committee of the
Education Service’s performance in managing and reducing incidents of
violence and aggression or distressed and challenging behaviour that have
impacted staff in the workplace.  The report provided a summary of the
information gathered in Term 3 of the academic year 2023/24 in relation to
incidents in schools and other educational settings which resulted in an
emotional or physical impact on another member of staff.  It also provided
information on the activity of an established Working Group to prevent and
reduce the number of incidents. 
In response to a question from C Weston regarding an action plan for
improvement following reporting of incidents, F Mackay confirmed it is an
intention of the working group for an action plan to be developed.  F Mackay
also confirmed the working group are looking to establish communications to
our workforce and stakeholders regarding ongoing activity, the importance of
reporting incidents and outcomes. 
In response to a request from Councillor McCole to ensure the action plan is
time bound and able to measure success, F Mackay agreed this would be
implemented. 
Resolved:
The contents of Report G/24/83, be noted. 
(C Weston and J Kettle left the Meeting at this Point.) 
10. Violence at Work Charter 
There was a report submitted by Corporate HR Manager (G/24/84) proposing
a way forward with regard to the suggestion that Perth and Kinross Council
sign up to the Unison Violence at Work Charter as suggested at the meeting
of Employees Joint Consultative Committee in March 2024. 
Page 11 of 88

Page 12

In introducing the report, P Johnstone advised the Charter has been reviewed
there are suggested areas of work to address in the first instance, with a view
to signing the Charter in 12 months time. 
Resolved:
(i) The contents of Report G/24/84, be noted. 
(ii) Development and implementation of an action plan, using the improvements
which have been identified, for completion in 12 months at which point formal
commitment to the Charter can be made, be agreed. 
11. Health and Wellbeing Update 
There was a report submitted by Corporate HR Manager (G/24/85) providing
an update on current health and wellbeing data and current health and
wellbeing activities. 
In response to a question from Councillor Rebbeck regarding flexible working
and impact on health and wellbeing, F Thomson confirmed that while flexible
working is not available for all staff, it is seen as a positive.  F Thomson added
that the Council’s hybrid working guidance has been in place since April and
any impact will be evidenced in the next quarters report to Committee. 
S Hope reiterated the importance of training for managers on dealing with
Health and Wellbeing, especially with restructuring within HR. 
Resolved:
The contents of Report G/24/85, be noted. 
12. Mental Health Support Update 
There was a report submitted by Corporate HR Manager (G/24/86) providing
information on the performance of the first year of the Vivup Your Care
Employee Assistance Programme and other activity related to supporting
employee mental health. 
Councillor McCole advised she is pleased to see interventions in place to
improve absences. 
Resolved:
The contents of Report G/24/86, be noted. 
13. Fair Work Activity 
There was a report submitted by Corporate HR Manager (G/24/87) providing
an update on the activity agreed at Finance and Resources Committee in
November 2023 to support the implementation of Fair Work First.   
In introducing the report P Johnstone advised all Councils are required to
publish a statement indicating their commitment to the Fair Work principles in
order to access grant funding but signature is required from Trade Unions.
The Council has published a statement that is currently unsigned.
Page 12 of 88

Page 13

In response to a question from Councillor Rebbeck regarding the purpose of
the funding, P Johnstone advised this can be used by the Council or
reallocated to third parties and may result in the delay of appointed projects if
not secured. 
In response to a question from Councillor McCole querying what is causing
the delay in signing the statement, S Hope advised that whilst Unison are
happy with the majority of what happens within PKC in relation to Fair Work,
they have been advised by Unison to wait on a national position. 
P Johnstone advised in the absence of a signed statement PKC have had to
supply additional acceptable evidence to Scottish Government, in order to
secure the funding.   
Councillor McCole urged all parties to reach a resolution as soon as possible. 
Resolved:
(i) The contents of Report G/24/87, be noted.
(ii) The proposal for further meaningful engagement between the Council and
recognised Trade Unions with a view to agreeing the required Fair Work First
statement and making a public commitment to its content, be agreed. 
14. Workplace Equality Fund Project Update  
There was a report submitted by Corporate HR Manager (G/24/88) providing
information on action that the Council is taking to be a more inclusive
employer, specifically around neurodiversity. 
Councillor Rebbeck thanked officers for their excellent work in relation to this
project. 
Resolved:
The contents of Report G/24/88, be noted. 
15. Newly Qualified Social Worker Recruitment 
There was a report submitted by Corporate HR Manager (G/24/89) proposing
a revised approach to utilise positive experience with social work students to
address ongoing recruitment challenges in this area. 
Councillor Rebbeck thanked officers for their pragmatic approach to an
ongoing issue. 
Resolved:
(i) The contents of Report G/24/89, be noted. 
(ii) The proposal to use selective ring-fenced recruitment to ensure that newly
qualified social workers are provided with direct access to vacancies, be
agreed. 
Page 13 of 88

Page 14

16. Employee Survey 
P Johnstone, Corporate HR Manager, provided an update to members on the
Employee Survey which closed on 31 May 2024. P Johnstone extended her
thanks to the Unions for their contribution to the design of the survey
questions and promoting with their members to complete.  P Johnstone
advised engagement has increased since the last employee survey, from 27%
to 47%, and analysis of results is ongoing.  Full results and guidance for
discussion with teams will be shared later this month and this should aid
discussions to establish actions locally. 
The Committee noted the update. 
17. Any Other Competent Business 
P Johnstone reminded those present that the People and Culture Strategy
has now been signed by Finance and Resources Committee and extended
her thanks to the Trade Unions for their involvement.  P Johnstone advised
this is an ongoing piece of work with the strategy spanning four years. 
18. Date of Next Meeting 
16 September 2024
Page 14 of 88

Page 15

Perth and Kinross Council
Finance and Resources Committee
Employees Joint Consultative Committee 
Minute of hybrid meeting of the Employees Joint Consultative Committee held in the
Council Chambers, 2 High Street, Perth on Monday 16 September 2024 at 2.00pm. 
Present: Representing Perth and Kinross Council: 
Councillors S McCole and J Rebbeck. 
Present: Representing Trade Unions: 
S Hope (UNISON)
C Weston (EIS) (up to Item 9)
M Mackie (SSTA)
S Robertson (Unite the Union) (up to Item 8) 
In Attendance:  E Bayne, J Beveridge, L Hamilton, J Guild, P Johnstone, L
McGeorge and F Thomson (all Strategy, People and Resources); F
MacKay (Economy, Place and Learning). 
Apologies: V Leonard, S Topen-Cooper and L Roberts. 
S Hope in the Chair. 
1. Welcome and Apologies 
S Hope welcomed all present to the meeting and apologies were noted as
above. 
2. Declarations of Interest 
There were no declarations of interest made in terms of the Councillors’ Code
of Conduct. 
3. Minute of Meeting of the Employees Joint Consultative Committee of
17 June 2024 for Approval 
The minute of meeting of the Employees Joint Consultative Committee of
17 June 2024 was submitted and approved as a correct record. 
4. MATTERS ARISING 
(i) H&S Consultative Committees 
L Hamilton advised work is ongoing to bring a report regarding the set up of a
consultative committee to the Strategic Leadership Team by the end of this
month, with the target date for the first Committee meeting in mid December.    
3(iii)
Page 15 of 88

Page 16

(ii) Fair Work First 
F Thomson advised a productive meeting had taken place with Trade Unions
and extended her thanks to all involved.  Two key requirements remain to be
agreed, before a statement is produced for publication and Trade Union
signatures are sought at future meetings. 
S Hope advised he would arrange a forum for Trade Unions to ensure quick
decision making as required. 
(iii) People and Culture Strategy 
P Johnstone that the Workforce Planning Board will be responsible for
ensuring collective oversight of workforce planning activity across PKC. 
She also advised that the Audit Scotland Best Value Audit on Workforce
Innovation has been completed; advised a draft report has been prepared and
will be submitted to Audit and Risk Committee at the end of September.   
P Johnstone also added there has been a change to the Leadership structure
following the Director of Economy, Place and Learning leaving and the
decision to take this post as a saving along with re-aligning teams under the
Chief Executive/Depute Chief Executive and Chief Officer Health & Social
Care Partnership.  P Johnstone advised that a separate email had been
issued to the unions outlining the communications circulated and the new
structure. 
(iv) Crieff Primary School 
J Beveridge joined the meeting to provide an update on ongoing
investigations at Crieff Primary School.  He advised a smell was reported on
Wednesday 4 September to Property Services, although no source could be
found following testing.  Following reports of staff becoming unwell, further
testing was carried out with a focus on the kitchen area, but still no source
could be identified. 
All testing was repeated again the following day with no conclusion of the
source.  Following a member of Tayside Contract staff fainting, an ambulance
was called who subsequently reported to Scottish Fire and Rescue Service
and the school evacuated.  SFRS took over the building to perform further
testing but still could not identify a source. 
J Beveridge advised Police Scotland issued a public communication to advise
a suspected chemical leak was present however this was not accurate
information. 
Crieff Primary School was closed to all pupils and staff on Friday 6 September
as precaution.  Specialist consultants were brought in for further testing, with a
focus on the kitchen area, but results were inconclusive and a source could
not be identified. 
Page 16 of 88

Page 17

Work is ongoing with Health and Safety, Environmental Health and Tayside
Contracts.  Potential external sites and influences are also being explored. 
Tayside Contracts are back in operation from Monday 16 September and
devices are in place for ongoing monitoring. 
L Hamilton added that symptoms experienced by staff were in line with a
chemical reaction.  Involvement has also been sought from Public Health but
again no conclusion reached.  L Hamilton advised the incident is not
reportable under RIDDOR. 
5. Health and Safety Performance Report Quarter 1 – 2024/25 
There was a report submitted by the Strategic Lead – Strategic Planning,
People and Performance (G/24/127) informing and assisting the Employees
Joint Consultative Committee in monitoring health and safety compliance and
performance across Perth and Kinross Council and providing an overview of
health and safety activities undertaken. 
C Weston extended her thanks to those involved in taking forward the noise
reporting. 
Resolved:
The contents of Report G/24/127, be noted. 
6. Fire Safety Quarterly Report – Quarter 1 – 2024/25 
There was a report submitted by the Strategic Lead – Strategic Planning,
People and Performance (G/24/128) informing and assisting the Employees
Joint Consultative Committee in monitoring fire safety performance across
Perth and Kinross Council and providing an overview of fire safety activities
undertaken. 
Resolved:
The contents of Report G/24/128, be noted. 
7. Staff Reporting: Incidents of Violence/Aggression and Incidents of
Distressed/Challenging Behaviour in Education Settings, Term 4 2023/24   
There was a report submitted by the Strategic Lead – Education and Learning
(G/24/129) informing Employees Joint Consultative Committee of the
Education Service’s performance in managing and reducing incidents of
violence and aggression or distressed and challenging behaviour that have
impacted staff in the workplace. The report provides a summary of the
information gathered in Term 4 of academic year 2023/2024 in relation to staff
reports of incidents in schools and other educational settings which had an
emotional or physical impact on them. It also provides information on the
activity of an established working group to prevent and reduce the number of
incidents. 
Page 17 of 88

Page 18

In response to a request from M Mackie regarding sharing data at school level
with staff at Consultative Committees, F Mackay advised a Power BI page has
been developed to allow schools to view their own data.  There has been a
delay in launching this due to staff absence but should be available this term. 
In response to a question from C Weston regarding staff being off sick due to
an incident of violence and aggression, but this being recorded as work
related stress and the impact this may have on data, F Mackay confirmed the
data in the report is only in relation to incidents which have been reported.  F
Thomson added that data and categories will be reviewed and guidance can
be issued if appropriate to assist with accurate recording.  P Johnstone also
added that while an initial absence may be related to physical injuries
following an incident of violence or aggression, any ongoing absence is more
likely to be as a result of reduced wellbeing following the incident. 
Councillor McCole requested clarity of reporting going forward to ensure
accuracy of data. 
S Hope commented the sharing of CALM Trainers across services is positive
and welcomed this approach. 
Councillor Rebbeck commented that reasons for violence and aggression
within classrooms can be multifaceted, and it is important to note pupils with
additional support needs and societal impacts are both contributing to
incidents.  Councillor Rebbeck recognised the number of staff in classrooms is
a factor and hopes the introduction of the mobile phone policy will have a
positive impact going forward. 
Resolved:
The contents of Report G/24/129, be noted. 
M MACKIE LEFT THE MEETING AT THIS POINT. 
8. Menopause Awareness Month 
There was a report submitted by the Corporate Human Resources Manager
(G/24/130) providing an update on planned activity for Menopause Awareness
Month throughout October 2024 and Menopause Awareness Day on 18
October. 
In response to a question from Councillor McCole regarding how menopause
guidance is working for staff, F Thomson advised the guidance is refreshed
regularly and a link to the existing guidance is available within the report.  F
Thomson added that feedback from trade unions is welcomed, and the
guidance can be added to a future agenda to ensure it is sufficient. 
S Hope advised he would feed back information on any union specific events
being held for Menopause Awareness Month. 
Resolved:
The contents of Report G/24/130, be noted.
Page 18 of 88

Page 19

(C Weston Left the Meeting at this Point.) 
9. Health and Wellbeing Update 
There was a report submitted by the Corporate Human Resources Manager
(G/24/131) providing the Employees Joint Consultative Committee an update
on current health and wellbeing data and activities. 
In response to a question from Councillor McCole regarding comparison of
working days lost to other Local Authorities, P Johnstone advised national
figures for 2023/24 are yet to be published. 
In response to another question from Councillor McCole regarding the impact
on remaining staff when longer term absences occur, E Bayne advised that
the cumulative impact is recognised and mitigations are put in place as far as
possible but the knowledge loss can be problematic.  P Johnstone added it
can be largely dependent on the size of the school impacted. 
Resolved:
The contents of Report G/24/131, be noted. 
10. People and Culture – Skills Academies to Support Hard to Fill
Occupational Roles 
There was a report submitted by the Senior Human Resources Officer
(G/24/132) providing information and raising awareness about ongoing
discussions relating to an approach to support recruitment to hard to fill
occupational roles. 
In response to a question from L McGeorge regarding employment of those
without the required qualifications, P Nicoll advised that applicants would have
to meet the essential requirements of an advertised role this would not be
encouraged and the majority of thoseinvolved are entry level. 
In response to a question from Councillor McCole regarding target audience,
P Nicoll advised it is mostly individuals accessing the services of the Skills
and Employment Support Team or via the Job Centre.  P Nicoll added the
vacancies will be advertised in the normal manner but the Skills Academies
give opportunity to those who may not usually apply. 
Councillor Rebbeck commented this was a welcomed approach. 
Resolved:
The contents of Report G/24/132, be noted. 
11. Employee Survey 
There was a report submitted by Corporate Human Resources Manager
(G/24/133) providing an update on the Employee Survey. 
Page 19 of 88

Page 20

In introducing the report P Johnstone advised areas for improvement have
been identified and work is ongoing with managers regarding team specific
results. 
In response to a question from L McGeorge regarding a 1:1 discussion
template, F Thomson advised this would be available on Eric soon. 
In response to a question from Councillor Rebbeck regarding access to the
survey to staff who would not usually work on a PC, F Thomson advised it is
not known what percentage contributed to the overall results but gave the
example of events which were held at Friarton to help and encourage staff
who do not regularly use a PC to complete the survey.  
In response to a request from S Hope to view the full results, F Thomson
advised there is a link within the report showing all PKC results and a
breakdown per Strategic Lead area. 
Resolved:
The contents of Report G/24/133, be noted. 
12. Any Other Competent Business 
J Guild advised the Employees Joint Consultative Committee Constitution and
Function has been updated to reflect changes in management structure and
job titles, committee names and team names within the organisation.  The
updated version will be circulated for comment before final approval and
noting by Finance and Resources Committee on 18 September. 
13. Date of Next Meeting 
Monday 9 December 2024. 
Page 20 of 88

Page 21

Finance and Resources Committee 
Outstanding Business Statement (OBS) 
(Report No. 25/23) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
22. 23 Mar 2023 
Executive
Sub-
Committee
Revenue Budget
2022/23 – Tayside
Contracts
The Strategic Lead - Legal
and Governance to raise
the issue of the 75% rule
and the possibility of
flexible voting
arrangements with the
Clerk of Tayside Contracts
Joint Committee and the
Head of Legal at Angus
Council. 
A meeting to be arranged
with the Chief Executive
of Tayside Contracts and
the Legal Leads from
Angus, Dundee and
Perth to discuss voting
arrangements. 
Ongoing
Lisa Simpson 30 April
2025
30 April
2025
31.  20 November
2024
Item 5. 
Revenue Budget
2024/25 – Update
no. 2
Regarding the projected
overspend of operating
costs at Perth Harbour,
Councillor Laing to write a
letter to Transport
Scotland on behalf of the
committee stressing their
frustration with the delay
of the formal consultation. 
Councillor Laing and
Councillor Barrett to write
Verbal update to be
provided at committee on
5 February 2025. 
Serge Merone 5 February
2025
5 February
2025 
4
Page 21 of 88

Page 22

No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
a joint letter to Jim Fairlie
to see if he can help
progress the situation. 
32.  20 November
2024
Item 5.
Revenue Budget
2024/25 – Update
no. 2
Further information to be
shared with members on
the timescales of the
ALEO review.
Verbal update to be
provided at committee on
5 February 2025. 
Charlene Guild 5 February
2025
5 February
2025
33. 20 November
2024
Item 5. 
Revenue Budget
2024/25 – Update
no. 2
Private briefing note be
shared with members on
the challenges and the
factors beyond the control
of the Crannog Centre.
Response was circulated
to members via email. 
Complete
Scott Walker  5 February
2025
5 February
2025 
Page 22 of 88

Page 23

Perth and Kinross Council 
Finance and Resources Committee 
5 February 2025 
Revenue Budget 2024/25 – Update No. 3 
Contact Officer: Scott Walker, Chief Finance Officer
(Report No. 25/24) 
1. Purpose 
1.1 This report provides an update on progress with the 2024/25 General Fund
Revenue Budget based upon the November 2024 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected under spend on the 2024/25 General Fund
Management Budget is £1.155 million (see Appendix 1).   
2. Recommendations 
The Committee is requested to: 
(i) note the contents of the report,
(ii) note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2,
(iii) note the projected outturn for Corporate Budgets set out in Section 6,
(iv) note the funding update provided in Section 7,
(v) note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 4,
(vi) approve the adjustments to the 2024/25 Management Revenue Budget
(vii) detailed in Sections 9, 10 & 11 and Appendices 1, 2, 4, 5, 6, and 7,
(viii) note the financial risks set out in Section 12 and Appendix 8. 
3. Structure 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 2024/25 Additional Funding
Section 10 2024/25 Virements
Section 11 2024/25 Movements in Reserves
Section 12 Financial Risks
Section 13 Conclusions 
5
Page 23 of 88

Page 24

4. Background 
4.1 This report updates the Committee on progress with the 2024/25 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the November 2024 ledger,
updated for any subsequent known material movements. 
4.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2024/25 Revenue Budget on 28
February 2024 (Report No. 24/63 refers).  In addition, adjustments approved
by the Finance & Resources Committee on 24 April, 18 September 2024 and
20 November 2024 (Report Nos. 24/130, 24/260 and 24/318 refer) are
reflected in Appendix 1 (Column 2). 
5. Revenue Monitoring – Service Budgets 
5.1 The total net projected under spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £1.111 million which represents
0.3% of total net Service expenditure.  Since the last update, this is a positive
movement of £2.040 million. 
5.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
5.3 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets. 
Education and Learning 
5.5 The projected outturn for Education and Learning excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
anticipated to be on target against budgets which represents a movement of
£1.164 million from the last update.  The individual elements contributing to
this movement are summarised in the following table with commentary on the
significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Education & Learning Core Under spend (23) (1.7) (18)
Nursery Sector Under spend (976) (4.0) (299)
Primary Sector Over spend 1,064 2.3 (264)
Secondary Sector Under spend (466) (9.1) (546)
Special Sector Over spend 7 - (11)
Home to School Transport Over spend 394 3.7 (26)
TOTAL On Target - - (1,164)
Page 24 of 88

Page 25

5.6 In the Nursery Sector, there is an increase in the projected under spend of
£299,000 due to additional staff slippage and reduced demand for deferred
places. 
5.7 In the Primary Sector there is a reduction in the projected over spend of
£264,000 due to reduced expenditure on supply teachers, in part during the
strike days in October 2024. 
5.8 Within the Secondary Sector, there is a reduction in the projected over
spend of £546,000 due to a reduction in pupil rolls partially offset by increased
loan charges. 
5.9 In Home to School Transport there is a reduction in the projected over
spend of £26,000 following inclusion of savings from the strike days in
October 2024. 
5.10 The Devolved School Management Scheme is currently projected to under
spend by £200,000.  However, some schools are experiencing challenges in
delivering approved staff slippage targets and facing inflationary pressures
against budgets that have been reduced over previous years.  The budgets
for the Devolved School Management scheme are allocated by financial year
(April – March), whereas expenditure is incurred by academic year (August –
June). 
5.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.864 million.  It is anticipated that the projected
under spend on teacher and support costs will be carried forward to 2025/26
to meet commitments.  The budgets for the Pupil Equity Fund scheme are
allocated by financial year, whereas expenditure is incurred by academic
year. 
Children, Families and Justice 
5.12 The projected outturn for Children, Families and Justice is £387,000 or
1.4% less than budget which represents a movement of £387,000 from the
last update.  The individual elements contributing to this position are
summarised in the following table with narrative on the significant variances
below. 
Function Projected Outturn Movement 
£’000 % £’000
Children & Families Under spend (387) (1.7) (387)
Justice Service On target 0 - -
TOTAL Under spend (387) (1.4) (387) 
5.13 There is an increase in the projected under spend on foster, kinship and
adoption payments and additional income, partially offset by further pressures
on residential placements and not achieving budgeted slippage targets. 
Page 25 of 88

Page 26

Economy, Development and Planning 
5.14 The projected outturn for Economy, Development and Planning is currently
anticipated to be £30,000 or 0.2% less than budget which represents a
movement of £90,000 from the last update.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (175) (2.5) (75)
Business and Investment Over spend 105 14.6 35
Tourism, Culture and Place Over spend  150 1.4 -
Development Management and
Building Standards
Under spend (110) - (50)
TOTAL Under spend (30) (0.2) (90) 
5.15 Service Wide there is an increase in the projected under spend of £75,000
due to staff slippage in excess of budgeted levels. 
5.16 In Development Management and Building Standards there is an increase
in the projected under spend of £50,000 due to additional planning & building
warrant income. 
Environment and Infrastructure 
5.17 The projected outturn for Environment and Infrastructure is currently
anticipated to be £480,000 or 1.4% less than budget which represents a
movement of £50,000 from the last update.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (300) (1.7) (50)
Traffic & Network Under spend (50) (4.6) -
Waste Disposal Under spend (350) (4.1) -
Refuse Collection Over spend 100 2.2 100
Fleet Over spend 120 - -
TOTAL Under spend (480) (1.4) 50 
5.18 Service Wide there is an increase in the projected under spend of £50,000
due to staff slippage in excess of budgeted levels. 
5.19 Across Waste Disposal, there is an increase in the level of income from sale
of recyclates (£100,000) that is offset by additional costs relating to essential
depot and site works (£100,000). 
5.20 In Refuse Collection there is a projected over spend of £100,000 due to a
shortfall in commercial waste income partially offset by savings on fuel. 
Page 26 of 88

Page 27

Housing and Communities 
5.21 The projected outturn for Housing and Communities is currently anticipated
to be £185,000 or 0.9% less than budget which represents a movement of
£90,000 from the position last reported.  The individual elements contributing
to this movement are summarised in the following table with commentary on
the significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (210) (2.4) (60)
Housing General Fund Over spend 40 0.5 -
Bereavement Services Over spend 15 1.9 -
Public Transport Unit Under spend (30) (0.8) (30)
TOTAL Under spend (185) (0.9) (90) 
5.22 On a Service Wide basis, there is an increase in the projected under spend
of £60,000 due to updated staff cost projections, partially offset by an
increased bad debt provision. 
5.23 Within the Public Transport Unit, there is a net projected under spend of
£30,000 made up of additional income from departure charges partially offset
by additional costs in relation to tendered services. 
Property Services 
5.24 The projected outturn for Property Services is currently anticipated to be
£550,000 or 0.8% more than budget which represents a movement of
£99,000 from the position last reported.  The individual elements contributing
to this movement are summarised in the following table with commentary on
the significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide  Over spend 385 0.6 57
Energy Under spend (324) (3.8) (85)
Maintenance Over spend 150 3.2 0
Facilities Management Over spend 339 5.5 99
Catering On target - 0 (170)
TOTAL Over spend 550 0.8 (99) 
5.25 On a Service Wide basis, there is a net increase in the projected over spend
of £57,000 following an update on staff and other costs alongside income
projections. 
5.26 On Energy, there is an increase in the projected under spend of £85,000 due
to updated rates and consumption information. 
5.27 In Facilities Management, there is an increase in the projected over spend of
£99,000 due to delays in implementing the new cleaning regime. 
Page 27 of 88

Page 28

5.28 In Catering, there is a reduction in the projected over spend of £170,000 due
to a fall in the uptake of school meals. 
Legal and Governance 
5.29 Within Legal and Governance there is a projected under spend of £9,000 or
0.2% which represents a movement of £87,000.  This movement is the result
of updated staff and other cost projections alongside income assumptions. 
Customer and Digital 
5.30 The projected outturn for Customer and Digital is currently anticipated to be
£119,000 or 1% more than budget which represents an increase of £30,000
from the last update.  The individual elements contributing to this movement
are summarised in the following table with commentary on the significant
movements below. 
Function Projected Outturn Movement 
£’000 % £’000
IT Over spend 69 1.2 0
Revenues & Benefits Over spend 50 0.8 30
TOTAL Over spend 119 1.0 30 
5.31 In Revenues and Benefits there is a net increase in the projected over spend
of £30,000 due to updated projections on staff and other costs. 
Strategic Planning and Performance 
5.32 Within Strategic Planning and Performance, there is a projected under
spend of £202,000 or 3.3% which represents an increase of £140,000 due to
the accelerated delivery of approved savings. 
Finance and Business Support 
5.33 The projected outturn for Finance and Business Support is currently
anticipated to be £507,000 or 5.7% less than budget which represents an
increase of £63,000 since the last update.  The individual elements
contributing to this movement are summarised in the following table with
commentary on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Finance Under spend (31) 0.0 (35)
Business Support Under spend (476) (12.5) (28)
TOTAL Under spend (507) (5.7) (63) 
5.34 Across both functions there are increases in the projected under spends,
primarily on staff costs due to the accelerated delivery of approved savings. 
Page 28 of 88

Page 29

6. Revenue Monitoring – Corporate Budgets 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Health & Social care 
6.2 On 11 December 2024, Perth and Kinross Integration Joint Board received a
report on the 2024/25 Financial Position (Report No. G/24/212 refers).  After
the application of earmarked Reserves and non-recurring funding, this report
presented a projected over spend of £1.243 million.  This position is
consistent with many other integration joint boards who also face significant
financial challenges in the current financial year.  Further information on this
position is set out in Appendix 3. 
6.3 Of the projected over spend set out above, £189,000 related to Social Care
and £1.054 million related to Health activity.  Under the terms of the
Integration Scheme, the Council is only exposed to the projected over spend
in relation to Social Care. 
6.4 The Integration Joint Board will be presented with a further update at its
meeting on 19 March 2025. 
Council Tax Reduction Scheme 
6.5 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.6 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements. 
6.7 In the current financial year, the Council is supporting approximately 8,600
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.91 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £150,000
which is reflected in Appendix 1. 
7. Revenue Monitoring – Funding 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll.
Page 29 of 88

Page 30

7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 December 2024
together with prior year comparative figures for the previous five financial
years. 
7.4 Between 2019/20 and 2023/24, the average collection figure to 31 December
was 81.61%.  The actual collection figure to 31 December 2024 was 81.17%
which is 0.44% less than the five-year average and 0.32% less than the
comparable position in 2023. 
7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
Page 30 of 88

Page 31

7.6 Given the 2024/25 collection information set out above and the growth in the
number of Band D equivalent properties, it is currently anticipated that Council
Tax income will exceed the budget by £250,000 in the current financial year
which is reflected in Appendix 1. 
Non-Domestic Rates 
7.7 The actual collection rate to 31 December 2024 was 81.38%, compared to
79.98% for the same period in 2023/24. 
8. Revenue Monitoring – Other Updates 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 Currently, for the current financial year, Live Active Leisure and Perth Theatre
and Concert Hall are projecting deficits that are in line with their approved
budgets. 
8.3 Culture Perth and Kinross are currently projecting a deficit for 2024/25 that is
significantly more than the level originally budgeted.  They have experienced
additional costs relating to the current year pay award, to historic equal pay
claims and to the running costs of their establishments, particularly Perth
Museum. 
Page 31 of 88

Page 32

8.4 Should these projections come to bear, Culture Perth and Kinross will have
negative unrestricted reserves as at 31 March 2025. 
8.5 Council officers will continue to work with Culture Perth and Kinross to provide
support and challenge but ultimately there may be a requirement to provide
additional funding in the current year. 
8.6 The Council previously agreed to underwrite costs of up to £170,000 in
relation to the opening of the Museum, particularly the café located within the
facility.  This support has not been required to date, and the budget is
currently sitting within Economy, Development and Planning. 
8.7 Approval is sought to delegate responsibility for providing this additional
financial support to the Chief Finance Officer.  Any payment will only be made
if absolutely required in order to ensure the financial position of Culture Perth
and Kinross at 31 March 2025. 
8.8 The long-term sustainability of the Council’s ALEOs across future financial
years remains challenging.  The Council’s Transformation and Change
Programme includes a review of ALEOs, and the Council will be asked to
consider options on future models of service delivery later this year. 
Tayside Contracts 
8.9 The operating environment for Tayside Contracts remains challenging.  They
continue to experience significant inflationary pressures on the price of staple
foods – beyond that of the headline CPI and RPI rates quote more widely. 
8.10 Tayside Contracts continue to identify mitigating actions, and the three
constituent Councils are looking at how they may assist.  Work continues
between officers of the Council and Tayside Contracts to further refine these
projections. 
8.11 Given the financial challenges facing Tayside Contracts, there is a risk that
the budgeted amount from the Trading Operations surplus of £550,000 will
not be received in the current year. 
Housing Revenue Account 
8.12 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 5. 
8.13 Across the Housing Revenue Account activity there is a net reduction in the
projected under spend of £23,000.  Within this movement, additional rental
income and a reduction in the bad debt provision is partially offset by
additional expenditure on repairs, insurance and Council Tax. 
8.14 As a result of the variances identified above Capital from Current Revenue will
reduce by £23,000. 
Page 32 of 88

Page 33

9. 2024/25 Additional Funding 
9.1 Since elected members were provided with the 2024/25 Revenue Budget
update on 20 November 2024 (Report No. 24/318 refers), notification has
been received of additional resources in the current financial year from
several sources as set out below.  To ensure that the 2024/25 Management
Budget continues to reflect the operational requirements of the Council,
several adjustments are required, which are summarised below and included
in Appendix 1 and Appendix 6. 
Scottish Government – Revenue Support Grant: 
• Maintain Teacher Numbers: £3.625 million (Education and Learning) 
• Teacher Induction Scheme: £106,000 (Education and Learning) 
• Teachers’ Superannuation: £2.258 million (Education and Learning) 
• SNCT Pay Offer: £760,000 (Education and Learning) 
• Ukraine Funding: £129,000 (Housing and Communities) 
• Scottish Welfare Fund: £368,000 (Customer and Digital Services)  
• Net other movements: reduction of £62,000 (Reserves)
Scottish Government – Ring Fenced Grant 
• Pupil Equity Fund: reduction of £10,000 (Education and Learning) 
9.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £7.184 million and reduction in Ring Fenced Grant
of £10,000 will be made through a redetermination of the Council’s funding.  It
is therefore necessary to adjust budgets for Education and Learning, Housing
and Communities, Customer and Digital Services, Reserves and Revenue
Support Grant. 
9.3 Action: The Council is asked to approve the adjustments set out at
paragraphs 9.1 and 9.2 which are reflected in Appendix 1 (Column 3) to this
report. 
Other Funding 
9.4 Other funding amounting to £1.885 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.  Details of this funding is set out in
Appendix 5. 
9.5 Action: The Committee is asked to note the receipt of £1.885 million of
additional resources, with this funding being reflected within Education and
Learning, Children, Families and Justice, Economy, Development and
Planning, Environment and Infrastructure and Housing and Communities as
additional grant income.  The current projected outturn assumes that all these
additional resources will be fully expended in 2024/25 or will be carried
forward under the terms of the grant award. 
Page 33 of 88

Page 34

10. 2024/25 Virements 
Contribution to/from Capital Fund 
10.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund. 
10.2 The latest monitoring indicates a projected increase in capital financing costs
(loan charges) of £16,000 based on the latest treasury management activity
and a reduction of £209,000 in income from interest on revenue balances due
to reduced cashflows.  This will result in a reduced Contribution to the Capital
Fund of £225,000 in the current financial year. 
10.3 Action: The Committee is requested to approve the virement of £16,000 to
the Capital Financing Costs (Loan Charges) Budget and £209,000 to Interest
on Revenue Balances with a corresponding reduction in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 5) to this report. 
Service Virements 
10.4 To ensure that the 2024/25 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 5) that have been
processed in line with the Scheme of Administration. 
10.5 These adjustments include allocations of pay award funding, including support
to ALEOs, Tayside Contracts and the Health and Social Care Partnership,
and adjustments between Strategic Leads to ensure budgets are aligned with
responsibility. 
11. 2024/25 Movements in Reserves 
11.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2024 (per
unaudited Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2024/25. 2025/26 and 2026/27.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves.
11.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied. 
Page 34 of 88

Page 35

ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
11.3 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration. 
Balances Held Under Statute / Regulation 
11.4 Approval is sought to draw down resources of £820,000 from the Council Tax
Income for Affordable Housing earmarked Reserve.  Funding of £120,000
will support the new house building at Weavers Gait, Kinross and £700,000
will contribute to the acquisitions of properties in Dunkeld. 
11.5 Action: The Committee is asked to approve the transfer of £820,000 from the
Council Tax Income for Affordable Housing earmarked Reserve to Housing &
Communities.  This adjustment is reflected in Appendix 1 (Column 5) to the
report. 
Balances Held for Specific (Previously Approved) Purposes 
11.6 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
11.7 Specifically, authority is sought to transfer: 
• £540,000 from Services to the Transformation and Workforce
Management earmarked Reserve in line with actual spending profiles.
• £370,000 from Customer and Digital to the Anti-Poverty earmarked
Reserve following the receipt of additional funding from the Scottish
Government.
• £175,000 to Housing and Communities from the Community Resilience
earmarked Reserve to fund projects and initiatives across Perth and
Kinross.
• £20,000 to Housing and Communities from the Community Investment
Fund earmarked Reserve to support approved applications.
• £420,000 to Housing and Communities from the Car Park earmarked
Reserve for Rural Electric Vehicle Charging Points and Ticket issuing
machines.
11.8 Action: The Committee is asked to approve the transfer to / from earmarked
Reserves set out in paragraph 11.7 above.  These adjustments are reflected
in Appendix 1 (Column 5) to the report. 
Page 35 of 88

Page 36

11.9 In addition, in setting the 2024/25 Revenue Budget in February 2024, the
Council approved expenditure to fund several specific initiatives.  For a variety
of reasons including consultation, capacity and timing issues, there has been
slippage in the delivery of a few of these projects that may result in the
expenditure not being incurred in the current financial year.  Projects totalling
£555,000 are set out at Appendix 7. 
11.10 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 7 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery.
The final outturn for individual projects may change before the end of the
financial year, therefore, by agreeing the projects within Appendix 7, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves. 
11.11 Should any of the projects no longer be a priority, the projected under spend
would be available to support the financial management of the Council in both
current and future financial years. 
11.12 Action: The Committee is asked to confirm that the projects listed in
Appendix 7 remain a priority and that the final under spends, currently
projected at £555,000 are transferred to an earmarked Reserve to ensure
delivery.  These adjustments are reflected in Appendix 1 (Column 5) to the
report. 
11.13 In November 2024, the events planned for the weekend of the Christmas
lights switch on were cancelled due to inclement weather.  This is now subject
to an ongoing insurance claim so that the Council recovers the costs that had
been incurred.  Should this claim be successful, and the refund is received
prior to 31 March 2025, approval is sought to create an earmarked Reserve
for events so that the funding is available to augment activity in future years. 
11.14 Action: Subject to a successful insurance claim by 31 March 2025, approval
is sought to transfer the receipt to an earmarked Reserve to support events in
future financial years. 
Unearmarked Reserves – Savings from Strikes 
11.15 During October 2024, industrial action in the form of strikes took place in
schools across Perth and Kinross.  This resulted in direct staff savings of
£883,000 which will be removed from Education and Learning and applied to
unearmarked Reserves.  This adjustment is included in Appendix 1 and
included in Appendix 6. 
11.16 Action: The Committee is asked to approve the transfer of £883,000 which is
the saving on the strikes that took place in October 2024 from Education and
Learning to unearmarked Reserves.  This adjustment is reflected in Appendix
1 (Column 5) to the report. 
Page 36 of 88

Page 37

12. Financial Risks 
12.1 In preparing the Council's 2024/25 revenue monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
12.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
12.3 Risks are captured within the body of the report with a summary being
maintained in Appendix 8. 
12.4 Two risks have been removed for the current year with confirmation of funding
for the following: 
• Current Year Pay Awards
• Funding
o Pupil Teacher Ratio
o Teachers Superannuation Costs
13. Conclusion 
13.1 Based on the November 2024 ledger, a projected under spend of £1.155
million has been identified in the current financial year. 
13.2 This level of projected under spend, along with the transfer included at
paragraph 11.15 will result in an increase in the level of unearmarked
Reserves to £17.979 million or 3.8% (see Appendix 6). 
13.3 The financial position of the Council and its partners including the Health &
Social Care Partnership and the ALEOs remains challenging and regular
updates will be provided to the Council and the Finance and Resources
Committee as the position develops. 
APPROVED 
Name  Designation Date
Scott Walker Chief Finance Officer 21 January 2025 
Page 37 of 88

Page 38

ANNEX 
1. Implications, Assessments, Consultation and Communication 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 38 of 88

Page 39

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.    
Page 39 of 88

Page 40

4. Consultation 
Internal 
4.1 The Strategic Leadership Team have been consulted in the preparation of this
report. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix 1 – 2024/25 Management Budget
Appendix 2 – General Fund 2024/25 Projected Outturn – Service Analysis
Appendix 3 – Perth & Kinross IJB 2024/25 outturn
Appendix 4 – Housing Revenue Account 2024/25 Projected Outturn
Appendix 5 – Other Fundings
Appendix 6 – General Fund Balances
Appendix 7 – Council Approved Revenue Budget Flexibility 2024/25
Appendix 8 – Financial Risks 
Page 40 of 88

Page 41

PERTH & KINROSS COUNCIL GENERAL FUND 2024/25 REVENUE BUDGET - SUMMARY Appendix 1
(1) (2) (3) (4) (5) (6) (7) (8) (9)
2024/25 Previously Movements Virements Movements 2024/25 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 1
Service Budgets
Education and Learning 166,774 (1,634) 6,301 453 (1,049) 170,845 170,845 0 0.0%
Children, Families and Justice 25,284 1,645 112 27,041 26,654 (387) (1.4%)
Economy, Development and Planning 13,901 3,730 207 17,838 17,808 (30) (0.2%)
Environment and Infrastructure 34,666 389 300 35,355 34,875 (480) (1.4%)
Housing and Communities 17,878 3,057 129 91 1,307 22,462 22,277 (185) (0.8%)
Property Services 65,471 1,040 1 (34) 66,478 67,028 550 0.8%
Legal and Governance 4,381 252 36 (110) 4,559 4,550 (9) (0.2%)
Customer and Digital Services 10,302 1,461 368 89 (370) 11,850 11,969 119 1.0%
Strategic Planning, People and Performance 5,948 446 (15) (264) 6,115 5,913 (202) (3.3%)
Projects and Programmes 131 733 1 (393) 472 472 0 0.0%
Finance and Business Support 8,227 541 70 8,838 8,331 (507) (5.7%)
Directorate Core Costs 1,003 64 (62) 1,005 1,025 20 2.0%
Sub - Total: Service Budgets 353,966 11,724 6,798 1,283 (913) 372,858 371,747 (1,111) (0.3%)
SECTION 2
Corporate Budgets
Health and Social Care 87,498 8,194 258 95,950 95,950 0 0.0%
Contribution to Valuation Joint Board 1,466 1,466 1,466 0 0.0%
Capital Financing Costs 16,628 1,846 16 18,490 18,490 0 0.0%
Interest on Revenue Balances (5,411) (474) 209 (5,676) (5,676) 0 0.0%
Net Contribution to/(from) Capital Fund 6,710 (1,372) (225) 5,113 5,113 0 0.0%
Contribution to/(from) Insurance Fund 200 200 400 400 0 0.0%
Trading Operations Surplus (550) (550) (550) 0 0.0%
Support Service External Income (2,238) 0 (2,238) (2,238) 0 0.0%
Tayside Pension Fund 1,655 1,655 1,711 56 3.4%
Apprenticeship Levy 956 956 956 0 0.0%
Pay Award 0 2,099 (2,099) 0 0 0 0.0%
Leadership and Procurement (1,505) 555 558 (392) (392) 0 0.0%
Council Tax Reduction Scheme 7,400 7,400 7,550 150 2.0%
Discretionary Relief 1,104 1,104 1,104 0 0.0%
Net Expenditure (General Fund) 467,879 22,772 6,798 0 (913) 496,536 495,631 (905) (0%)
5
Page 41 of 88

Page 42

PERTH & KINROSS COUNCIL GENERAL FUND 2024/25 REVENUE BUDGET - SUMMARY Appendix 1
(1) (2) (3) (4) (5) (6) (7) (8) (9)
2024/25 Previously Movements Virements Movements 2024/25 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 3
Funding
Revenue Support Grant (275,985) (7,950) (7,184) (291,119) (291,119) 0 0.0%
Ring Fenced Grant (3,806) 10 (3,796) (3,796) 0 0.0%
Non Domestic Rate Income (65,152) (203) (65,355) (65,355) 0 0.0%
Council Tax Income (107,517) (107,517) (107,767) (250) (0.2%)
Capital Grant (1,600) (139) (1,739) (1,739) 0 0.0%
Total Financing (454,060) (8,292) (7,174) 0 0 (469,526) (469,776) (250) (0.1%)
Financed from/(returned to) Reserves 13,819 14,480 (376) 0 (913) 27,010 25,855 (1,155)
Page 42 of 88

Page 43

APPENDIX 2
PERTH AND KINROSS COUNCIL - GENERAL FUND 2024/25 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 November 2024)
Variance Variance
£'000 £'000
EDUCATION AND LEARNING
Total 0 0
NON DEVOLVED
Education and Learning Core
(23) Staff slippage over and above budgeted target due to delay in filling post and projected
underspend on clothing grant.
Nursery Sector
(976) Projected additional slippage due to turnover of staff and lower than anticipated staffing required
for deferred places.
Primary Sector
1,064 Slippage target currently not being met within primary sector partly due to Scottish Government
directive of maintaining teacher numbers and the requirement to have a teacher in front of class at
all times. 
Secondary Sector
(466) Projected under spend due to reduction in required funding following drop in pupils numbers
partially offset by increased loan charges.
Special Sector
(409) Additional slippage due to turnover of staff and challenges in recruitment of posts, particularly Pupil
Support Assistants.
416 Projected over spend on Independent Special Schools placements due to increased number of
placements.
Home to School Transport
394 Projected over spend on Home to School transport due to increased costs following ASN
placements and contract changes.
DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
(200) There is a projected under spend on the DSM scheme of £200,000 or 0.3% across 80 schools and
early learning and childcare settings.  Schools are finding slippage targets and increasing costs
challenging to manage. This has been impacted by the requirement to maintain teacher numbers. 
In addition, per capita budgets allocations have not increased since a 25% reduction was agreed in
2016/17. Inflation has risen by 37% in the same period.
200 Projected carry forward of Devolved School Management.
PUPIL EQUITY FUND
100 At this time £100,000 is projected to be carried forward into 2025/26 for teacher and support staff
costs to the end of the current academic year.
(100) Projected carry forward of Pupil Equity Funding.
CHILDREN, FAMILIES AND JUSTICE
Total (387)
Children and Families
(87) Projected under spend due to additional income for Children Alone Seeking Asylum placements
and Wellbank offset by projected overspend in staffing due to not meeting slippage target.
(741) Projected under spend on foster, kinship and adoption in part due to reduction in overall
placements in foster carers.
441 Projected over spend on residential placements due to additional placements in excess of budget .
ECONOMY, DEVELOPMENT AND PLANNING
Total (30)
Service Wide
(175) Projected slippage across Economy, Development and Planning in excess of budgeted target.
Business and Investment
70 Perth Harbour - projected increase in operating costs /shortfall in income.
35 Additional legal costs within Estates.
Tourism, Culture and Place
150 Savings delayed due to the ongoing review of our cultural and leisure ALEOs.
Development Management and Building Standards
40 Projected over spend on legal costs associated with planning appeals.
(150) Projected additional planning and building warrant income based on income trend to date.
SERVICE Summary of Service Variances
5
Page 43 of 88

Page 44

APPENDIX 2
PERTH AND KINROSS COUNCIL - GENERAL FUND 2024/25 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 November 2024)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
ENVIRONMENT AND INFRASTRUCTURE
Total (480)
Service Wide
(300) Projected slippage across Environment and Infrastructure in excess of budgeted target.
Traffic and Network
(50) Projected additional income from statutory road network works.
Direct Services - Waste Disposal
(150) Projected saving on the waste disposal contract as a result of the new twin-streaming collection.
(300) Projected additional income from sale of recyclates as a result of the new twin-streaming
collection.
100 Additional costs relating to essential depot and site works
Direct Services - Refuse Collection
200 Projected net shortfall in commercial waste income
(100) Projected saving on fuel
Direct Services - Fleet
120 Projected additional cost of vehicle materials and repairs.
HOUSING AND COMMUNITIES
Total (185)
Service Wide
(250) Projected slippage across Housing and Communities in excess of budgeted target.
40 Projected shortfall in sales ledger bad debt provision
Housing General Fund
5 Void rent loss for housing support properties.
50 Projected increase in homeless costs including bad debts and energy costs.
(15) Reduction in 3rd party payments
Bereavement Services
15 Projected over spend on loan charges.
Public Transport Unit
40 Projected overspend on tendered service
(70) Projected additional income from park and ride departure charges
Car Park Trading Account
30 Final costs relating to Rural Electric Vehicle Charging Points project, already approved.
390 Additional budget required for replacement of Ticket Issuing machines
(420) Request to draw down from Car Park Trading Account Earmarked Reserves. Ticket Issuing
machines costs of £390,000 will be  repaid back over 2 years.
PROPERTY SERVICES
Total 550
Service Wide
(116) Projected shortfall in excess of slippage target
310 Projected shortfall due to delays in delivering the Pullar House saving partially offset by an  under
spend on water.
61 Projected various under / over spends on supplies and services, third party payments and capital
financing costs.
130 Projected reduction in income from capital recharges (£137,000) and RHI Income (£75,000)
partially offset against Pullar House cost sharing Income (£82,000).
Energy
(324) Projected reduction in energy costs due to reduced rates and consumption.
Maintenance
150 Projected increase in costs associated with the transfer of Bell's Sports Centre
Facilities Management
339 Delay in implementing new cleaning schedule required to achieve £406,000 Tayside Contract
approved saving. This was due to the requirement to consult with trade unions. Implemented
reduced cleaning days for schools from August 2024. Office cleaning to be delayed and with
revised schedules set to commence in 25/26
Catering
0 The projected number of additional meals has reduced to reflect more closely the full year
projected meal take up figures
Page 44 of 88

Page 45

APPENDIX 2
PERTH AND KINROSS COUNCIL - GENERAL FUND 2024/25 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 November 2024)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
LEGAL AND GOVERNANCE
Total (9)
120 Projected shortfall against slippage
33 Projected over spend on supplies and services
(162) Projected additional income across Legal and Governance
CUSTOMER AND DIGITAL
Total 119
IT
69 Projected over spend on staff costs
Revenues and Benefits
(155) Projected under spend on staff costs
95 Projected over spend on supplies and services including printing, interpreter services and GDPR
module
(68) Projected additional statutory additions income
178 Projected shortfall due to increased Service Charges from Social Housing Providers that are not
covered by Housing Benefit Subsidy
STRATEGIC PLANNING, PEOPLE AND PERFORMANCE
Total (202)
(202) Projected net under spend on staff costs, supplies and services and income.
PROJECTS AND PROGRAMMES
Total 0 0 No material variances at present
FINANCE AND BUSINESS SUPPORT Finance
Total (507) (31) Projected net underspend on staff costs, supplies and services and income.
Business Support
(476) Projected under spend on staff costs due to non-filling of vacancies in advance of delivering
2025/26 approved savings.
DIRECTORATE CORE COSTS
Total 20 20 Projected over spend on contribution to Tayside Valuation Joint Board
TOTAL (1,111)
Page 45 of 88

Page 46

Page 46 of 88

Page 47

APPENDIX 3
Perth and Kinross Health and Social Care Partnership
Projected outturn based on Revenue Monitoring to 30 September 2024
Social Care Health
Health &
Social Care
Partnership
£'000 £'000 £'000
DEVOLVED FUNCTIONS
Older People Services 1,968 1,109 3,077
Adult Services 1,742 (527) 1,215
Other Community Services (92) 0 (92)
Management/Commissioned/Other 165 (217) (52)
Budget Deficit 2,097 175 2,272
Sub Total - Hospital & Community Health 5,880 540 6,420
P&K IJB Lead Partner 0 (875) (875)
Dundee & Angus Hosted Services Recharges In/Out 0 1,557 1,557
Sub Total - Lead Partner Arrangement 0 682 682
GP Prescribing / Other Family Health Services 0 1,846 1,846
General Medical Services / Family Health Services 0 (42) (42)
Sub Total - PKHSCP 5,880 3,026 8,906
Approved Use of General Reserves in 2024/25 (1,286) (158) (1,444)
Approved Earmarked Reserves & Other 2024/25 Non-Recurring Funding (800) (884) (1,684)
Application of Remaining General Reserves (3,205) 0 (3,205)
Financial Recovery Measures (400) (930) (1,330)
Total Projected Outturn Perth & Kinross HSCP 189 1,054 1,243
Projected Out-turn Over /
(Under) Spend
5
Page 47 of 88

Page 48

Page 48 of 88

Page 49

APPENDIX 4
PERTH & KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2024/25 PROJECTED OUTTURN
(Based on expenditure to 30 November 2024)
£'000
645 Housing Repairs
Projected over spend in repairs  primarily due to resolving the backlog (£530,000), energy costs (£35,000), transport costs (£50,000)
and external voids (£30,000).
(50) Improvements
Delay in commencement of Energy Performance Certificates contract .
103 Letham, North & South
Projected increase in costs arising from garden maintenance contract (£113,000), energy (£8,000), property costs (£35,000). These
are partially offset by  projected under spends in tenants participation (£40,000), cleaning (£8,000) and non-domestic rates (£5,000).
25 Perth City and Specialist
Projected over spends on property costs (£20,000) and disturbance payments (£5,000).
(405) Administration
Projected under spend on bad debt provision based on latest assessment of arrears (£750,000), projected slippage across HRA in
excess of slippage target (£100,000) and projected underspend on non-domestic rates (£25,000) . These are partially offset by
additional property costs relating to void council tax (£160,000) and insurance (£115,000), void rents loss (£135,000) and increased
sales ledger bad debt provision (£60,000).
(460) Income
Projected additional income from mainstream rents (£220,000), garages and lock-ups (£25,000) and projected increased income for
Interest on Revenue Balances (£250,000). These are partially offset by reduced income from commercial rent (£35,000).
142 Capital Financed from Current Revenue
As a result of the projected net under spends highlighted above, this is the increase in the amount available to invest in the HRA
capital programme from the Revenue Budget.
0
Summary of Service Variances
5
Page 49 of 88

Page 50

Page 50 of 88

Page 51

APPENDIX 5
Other Grant Funding
Education and Learning
Scottish Government – Strategic Equity Funding £748,193
Scottish Government – School Meal Debt £29,310
Creative Scotland – Youth Music Initiative £171,645
Children, Families and Justice
Scottish Government – Care Experienced Children and Young People £143,325
Economy, Development and Planning
Scottish Government – Place Based Investment Programme 24-25 £150,000
Scottish Government – Community Led Development Funding Top Up £289,388
Scottish Government - EV Infrastructure Fund Resource Funding £140,750
Environment and Infrastructure
Cycling Scotland – Access to Bike, Parking & Storage £61,190
Housing and Communities
UK Government – Homes for Ukraine  £150,950
TOTAL £1,884,751
5
Page 51 of 88

Page 52

Page 52 of 88

Page 53

Appendix 6
General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments Balance
31/3/24 24/25 25/26 26/27 24/25 Future
£m £m £m £m £m £m £m £m
General Fund Balance 83.793
Balances Held Under Statute / Regulation
- Revenue Grants (17.337) 7.932 (9.405)
- Council Tax Income for affordable housing (5.609) 0.588 (0.283) (0.283) 0.820 (4.767)
- Developers Contributions: Affordable Housing (5.237) (5.237)
- Car Parking (1.532) 0.120 0.420 (0.992)
- Developers Contributions: Commuted Sums (1.218) (1.218)
- Service Concessions (17.262) 4.000 13.262 0.000
- Devolved School Management (0.501) 0.501 0.000
Sub total (48.696) 13.141 (0.283) (0.283) 1.240 0.000 13.262 (21.619)
Balances Held for Specific (Previously Approved) Purposes
- Council Approved Revenue Budget Flexibility (1.635) 1.083 (0.498) 0.730 (0.320)
- Feasibility 0.000 0.000 (0.100) (0.100) 0.200 0.000
- Culture (0.857) 0.561 0.025 (0.271)
- School Estate (2.164) 1.902 0.262 0.000
- Works Maintenance (0.200) (0.200)
- Community Resilience (0.175) 0.175 0.000 0.000
- Climate Change (0.205) 0.110 (0.095)
- Financial Assistance (Mod) (0.020) (0.020) (0.020) (0.020) (0.080)
- Project Feasibility Fund (Covid-19) (0.081) 0.062 (0.019)
- Modern Apprentice Scheme (0.367) 0.340 0.027 0.000
- Cemetery Walls (0.262) 0.150 0.076 0.036 0.000
- Salix (0.102) 0.102 0.000
- Local Area Partnerships (0.046) 0.046 0.000
- Community Investment Fund (0.087) 0.020 0.067 0.000
- Local Government Elections (0.053) (0.053) (0.053) (0.053) 0.212 0.000
Approved
Contributions from / (to)
Reserves
5
Page 53 of 88

Page 54

Appendix 6
General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments Balance
31/3/24 24/25 25/26 26/27 24/25 Future
£m £m £m £m £m £m £m £m
Approved
Contributions from / (to)
Reserves
- PH20 (0.062) 0.062 0.000
- Working Smarter (Covid-19) (0.115) 0.115 0.000
- School Counsellors (0.329) 0.227 0.102 0.000
- Ventilation Measures (0.076) 0.076 0.000
- Services for Children, Young People & Families (0.281) 0.281 0.000
Sub total (7.117) 4.896 0.005 (0.173) (0.303) 0.000 1.707 (0.985)
Balances Held for Other Purposes 0.000
- Transformation & Workforce Management (7.606) 3.291 0.060 (0.540) 0.171 (4.624)
- Anti - Poverty (1.664) 1.125 0.235 (0.427) (0.731)
Sub total (9.270) 4.416 0.295 0.000 (0.967) 0.000 0.171 (5.355)
Earmarked Reserves (65.083) 22.453 0.017 (0.456) (0.030) 0.000 15.140 (27.959)
Uncommitted General Fund Balance 18.710
Use of unearmarked Reserves in setting Budgets (2.249)
(25/26 £(0.503m); 26/27 £2.476m
Impact of Current Year Projected Outturn 1.155
Impact of Current Year Decisions (0.520)
Impact of proposals within this report 0.883
Updated Uncommitted General Fund Balance 17.979
Percentage of Net Revenue Budget 3.8%
Page 54 of 88

Page 55

APPENDIX 7
Council Approved Revenue Budget Flexibility 2024/25
Education and Learning
Ukraine Funding £120,000
Pipes and Drums £26,000
Fuel for Fun £20,000
Housing and Communities
Rural Employment Incentive Funding £128,000
Strategic Planning, People and Performance
HR Pay & Grading Resource £60,000
Anti Poverty Task Force £57,000
Legal and Governance
Local Area Committees £110,000
Property Services
Secondary School Estate Review £34,000
Total £555,000
5
Page 55 of 88

Page 56

Page 56 of 88

Page 57

Appendix 8
FINANCIAL RISKS
Risk to Revenue Budget Mitigation
1 Achievement of staff slippage targets, particularly
relating to teacher numbers and impact on pupil /
teacher ratio
- Proactive workforce
management
- Revenue monitoring
- Future budget submissions
2 Ceasing of additional Financial Insecurity Funding
on 31 March 2025.
- Proactive management
- Revenue monitoring
- Future budget submissions
4 Support for Tayside Contracts - Tayside Contracts
Governance & Strategy Group
- Revenue monitoring
- Future budget submissions
6 Funding to Health & Social Care - Proactive management
- Revenue monitoring
- Future budget submissions
5
Page 57 of 88

Page 58

Page 58 of 88

Page 59

Perth and Kinross Council 
Finance and Resources Committee 
5 February 2025 
Composite Capital Budget 2024/30 and Housing Investment Programme
2024/29 – Monitoring Report No.3 
Report by Chief Finance Officer
(Report No. 25/25) 
1. Purpose 
1.1 This report provides a summary position to date for the 6-year Composite
Capital Budget for 2024/25 to 2029/30 and the 5-year Housing Investment
Programme for 2024/25 to 2028/29 and seeks approval for adjustments to the
programmes. 
2. Recommendations 
2.1 It is recommended that the Committee: 
(i) notes the contents of the report.
(ii) approves the proposed adjustments to the six-year Composite Capital
Budget 2024/25 to 2029/30 set out in Sections 5 and 6 of the report
and summarised in Appendices I and II.
(iii) approves the proposed adjustments to the Housing Investment
Programme Budget 2024/25 to 2028/29 set out in Section 7 of the
report and summarised in Appendix III.
(iv) notes progress with the delivery of major Capital projects as
summarised in Appendix IV. 
3. Structure 
3.1 The report is structured over the following sections: 
• Section 4: Background / Main Issues
• Section 5: Composite Capital Programme – Gross Capital Resources
• Section 6: Composite Capital Programme – Expenditure
• Section 7: Housing Investment Programme
• Section 8: Summary 
4. Background / Main Issues 
4.1 The Finance and Resources Committee approved an updated six-year gross
Composite Capital Budget for 2024/25 to 2029/30 totalling £619.672 million
and a five-year gross Housing Investment Programme for 2024/25 to 2028/29
totalling £96.917 million at its meeting on 20 November 2024 (report 24/319
refers). A separate report at that meeting (report 24/321) approved a further
£3 million in 2025/26 in respect of the demolition and regeneration of the
6
Page 59 of 88

Page 60

Drummond Arms in Crieff, which has now been included in the budget at
Appendix II. This therefore took the Composite Capital Programme to a
revised total of £622.672 million. 
4.2 This report advises on expenditure to 30 November 2024, and the latest
estimate of the projected outturn for each of the years to 2029/30 for the
Composite Programme and 2028/29 for the Housing Investment Programme. 
5. Composite Capital Programme – Gross Capital Resources 
5.1 As a result of the latest monitoring exercise, further adjustments to the budget
are proposed. The current estimated total gross capital resources (which
includes movements in Capital Receipts, Capital Grants, Contributions and
borrowing) available over the six years 2024/25 to 2029/30 amount to
£623.577 million. 
5.2 Movements from the revised Composite Capital Budget approved on 20
November 2024 for the six years are summarised in the table below, and the
constituent elements for each year are shown in Appendix I. 
Total Gross Composite Capital Resources 
Approved 
20 Nov 2024
Current
Estimate
Movement 
£m £m £m
2024/25 170.283 164.313 (5.970)
2025/26 117.177 128.011 10.834
2026/27 136.685 133.388 (3.297)
2027/28 84.962 86.793 1.831
2028/29 65.787 64.549 (1.238)
2029/30 47.778 46.523 (1.255)
Total 622.672 623.577 0.905  
5.3 The above movements can be summarised as follows: 
Total 
£m
Increase in Scottish Government Grant (Section 5.4) 0.383
Increase in Ring Fenced Capital Receipts (Section 5.5) 0.148
Increase in Third Party Contributions (Section 5.6)  0.301
Increase in Revenue Contributions (Section 5.6)  0.036
Increase in Borrowing Requirement (Section 5.7 and 5.8) 0.037
Increase in Gross Capital Resources (Section 5.2) 0.905 
5.4 The Scottish Government allocated a Capital Grant of £383,000 in 2024/25
under the Road Safety Fund Initiative (Section 6.2.2). The only other
movement in Capital Grants across the 6-year programme is the deferral of
the Nature Restoration Fund grant of £175,000 in 2024/25 to 2025/26, as part
of the Scottish Government’s support for the 2024/25 pay award. 
Page 60 of 88

Page 61

5.5 Ring Fenced Capital Receipts for vehicle disposals have been revised as part
of the review of the Fleet Replacement programme, with an overall increase of
£148,000 across the 6-year programme (Section 6.2.8). 
5.6 There is an increase of £301,000 in Third Party Contributions, with additional
contributions towards Active Travel (£77,000, Section 6.2.2) and Structural
Maintenance (£262,000, Section 6.2.3), offset by a reduction on the Letham
Community Wellbeing Hub (£38,000, Section 6.4.5), in line with estimated
expenditure remaining on the project. There is also an increase in Revenue
Contributions on the Property Energy Efficiency programme, with a proposed
drawdown of £36,000 from the Salix Reserve (Section 6.4.4). 
5.7 The projected borrowing requirement in 2024/25, which is effectively the
balancing item for resources, is £129.037 million. This is £6.478 million
lower than the borrowing requirement approved by this Committee on 20
November 2024. 
5.8 The total borrowing requirement in the subsequent years 2025/26 to 2029/30
has increased by £6.515 million to £357.027 million, resulting in an overall
increase of £0.037 million in the total level of borrowing across the whole 6-
year programme. This increase in borrowing is summarised as follows: 
2024/25 2025/26 2026/27 Later
Years
Total 
£m £m £m £m £m
Increase in Vehicle Replacement
Programme Prudential Borrowing
(net of receipts) – Environment
and Infrastructure (Section 6.2.8)
(3.739) 2.751 0.200 0.880 0.092
Reduction in Street Lighting
Renewals Prudential Borrowing –
Environment and Infrastructure
(Section 6.2.8)
(0.055) 0.000 0.000 0.000 (0.055)
Movements arising from re-
phasing of expenditure and
receipts (Appendix II)
(2.684) 7.682 (3.439) (1.559) 0.000
Increase/(Reduction) in
Borrowing Requirement
(6.478) 10.433 (3.239) (0.679) 0.037 
5.9 The chart below shows the Capital Resources required to fund the 2024/25
Composite Capital Programme following the proposed budget adjustments
detailed in this report. 
Page 61 of 88

Page 62

6. Composite Capital Programme – Expenditure 
6.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme 
6.1.1 Total expenditure (net of grants and contributions) to 30 November 2024 on
the Composite Capital Programme is detailed in Appendix II and summarised
as follows: 
Projected
Outturn 
(£m)
Net
Expenditure
to 30 Nov
2024 
(£m)
% of
Projected
Outturn
Environment and Infrastructure  30.810 15.666 51%
Housing and Communities 1.829 0.577 32%
Economy, Development and
Planning
50.868    22.825 45%
Property Services 68.812 40.834 59%
Customer and Digital Services 8.347 2.614 31%
Health and Social Care 1.062 0.573 54%
Unallocated 0.052 0.000 0%
Total Net Capital Expenditure 161.780 83.089 51% 
6.1.2 Appendix IV includes updates on the progress of delivering the Council’s
major Capital projects. 
6.1.3 At present the accepted practice is that any budget savings identified on
specific projects are generally reallocated by the Service to other budgets
within their own programme. However, it is proposed that any such savings
arising are now “returned” to the programme and held as “Unallocated”
pending future consideration of how these savings should be applied. This
78.5%
16.4%
0.0%
2.3%
1.2%
1.6%
5.1%
Projected Capital Resources 2024/25
(December 2024)
Borrowing (£129.037M)
Grants (£27.026M)
Tay City Deal (-£0.069M)
Developer Contributions (£3.707M)
Third Party & Revenue Contributions (£1.952M)
Receipts (£2.660M)
£Million
Page 62 of 88

Page 63

approach would ensure any savings identified through budget monitoring are
redirected to the highest priorities. Savings identified within rolling
programmes will be subject to further consideration, given the nature of the
work undertaken. 
6.2 Environment and Infrastructure 
6.2.1 The Strategic Lead has reviewed the programme for Environment and
Infrastructure and proposed various budget adjustments, the most significant
of which are described below. 
6.2.2 Within Traffic and Road Safety, a Capital Grant of £383,000 has been
allocated from the Scottish Government Road Safety Initiative Fund towards
crash barriers near Meikleour with the Road Safety Initiative budget being
increased accordingly.  Also within Traffic and Road Safety, a Third-party
Contribution of £77,000 has been provided by Perth and Kinross Countryside
Trust towards works on Jeanfield Swift Footpath with a corresponding
increase in the Active Travel Grant expenditure budget. 
6.2.3 Within Asset Management – Roads and Lighting, Third Party Contributions of
£262,000 have been received towards Structural Maintenance in the current
year, with £181,000 received from Scottish Water and £81,000 from various
other sources. In addition, within Roads and Lighting the following rephasings
are proposed: 
Project 2024/25
£m
2025/26
£m
Later
Years
£m
Description
Structural
Maintenance
2.174 (0.335) (1.839) There is an acceleration of
funding proposed into the current
year to undertake emergency
works. Budgets in later years
have been broadly equalised as
part of this acceleration.
Footways 0.207 (0.022) (0.185) There is an acceleration of
funding proposed into the current
year to undertake rephased works
on Tay Street. Budgets in later
years have been broadly
equalised as part of this
acceleration. 
6.2.4 Within Asset Management – Bridges, Bridge Refurbishment Programme, in
line with the works ongoing over the remainder of the year it is proposed
£50,000 is accelerated to the current year from 2025/26. In addition, it is
proposed £5,000 is vired to Culteuchar Culvert for the final expenditure.
Finally within Asset Management – Bridges, it was reported to the previous
Committee in November that the Garry Viaduct project required rephasing
with adjustments to later year budgets. In line with the staff resources
available for this project in the current year, it is further proposed that
£326,000 of the budget this year is moved to 2025/26 (£66,000) and 2026/27
(£260,000). 
Page 63 of 88

Page 64

6.2.5 Within Flood Protection Schemes, the works on the Comrie Flood Protection
Scheme have commenced on the ground with site clearance undertaken to
create a works compound for the duration of the project as well as clearance
of the construction areas. The majority of construction for the scheme will take
place during 2025/26 and a revised expenditure profile has been received
from the contractor. It is therefore proposed that £4.282 million of the budget
from the current year, and £1.779 million of the budget in 2026/27 are moved
to 2025/26, totalling £6.061 million. 
6.2.6 In addition, within Flood Protection Schemes the following rephasings are
proposed: 
Project 2024/25
£m
2025/26
£m
Later
Years
£m
Description
Milnathort Flood
Protection Scheme
(0.184) 0.184 - Re-engagement is required for the
design of the scheme to be
progressed with this work now
due to take place next year.
South Kinross Flood
Protection Scheme
(0.179) 0.179 - The scheme design received
objections which need to be
addressed prior to proceeding.
The rephasing allows for time to
rectify these design concerns.
Coastal Change
Adaptation
(0.052) 0.052 - Rephasing to align with the work
to be completed on this project for
the remainder of the year. 
6.2.7 Within Waste Strategy, following completion of the Recycling Improvement
Fund project and in order to align the budget with the final spend, it is
proposed £104,000 is transferred to Prudential Borrowing Wheeled Bin
Replacement Programme. 
6.2.8 In addition within the Prudential Borrowing programme, the Vehicle
Replacement Programme has been reviewed. To better reflect the deliveries
planned in advance of the financial year end, and with a corresponding
adjustment to vehicles due to be disposed of, the adjustments in the below
table are proposed. Further to this, there is an underspend on the Street
Lighting Renewal – LED and Column Replacement works in the current year
of £55,000 which results in a reduction in Prudential Borrowing. Together, the
above movements result in a net increase in Prudential Borrowing over the 6-
year programme of £37,000. 
2024/25
£m
2025/26
£m
Future Years 
£m
Movement 
£m
Vehicle Replacement
Programme
(3.776) 2.977 1.039 0.240
Capital Receipts –
Vehicle Disposals
0.037 (0.226) 0.041 (0.148) 
6.2.9 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I and II.  
Page 64 of 88

Page 65

6.3 Economy, Development and Planning 
6.3.1 The Strategic Lead has reviewed the programme for Economy,
Development and Planning and proposed various budget adjustments, the
most significant of which are described below. 
6.3.2 Within the Perth and Kinross Lighting Action Plan, it is proposed that
£844,000 is moved from the current year to next year following a review of the
works which are anticipated to be completed prior to the financial year end.  
6.3.3 Within Other Planning Projects, the project to develop the Creative Exchange
has formally been completed with a remaining budget of £52,000. In line with
the proposal outlined at Section 6.1.3 above, it is proposed this is transferred
to Unallocated Resources for future consideration.  
6.3.4 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I and II. 
6.4 Property Services 
6.4.1 Within Project Support, the programme of works at Perth Academy are
progressing at an increased pace with the fourth phase of works on the
science block underway. It is therefore proposed that £1.351 million is
accelerated from 2026/27 into the current year. 
6.4.2 Within Property Service Management, the scope of works on projects due for
completion in the current year within the DDA and Alteration Works
Programme has been reduced slightly resulting in lower costs. It is therefore
proposed that £100,000 is moved from the current year to 2025/26. 
6.4.3 Following the cessation of trading of the contractor on the Pitlochry High
School Upgrade Programme, works on site has been halted and only ongoing
design works are anticipated for the remainder of the year. On site works will
recommence when a replacement contractor has been appointed and it is
anticipated this will occur around Easter 2025. It is therefore proposed that
£60,000 of the budget is moved to next year. 
6.4.4 Energy Efficiency Works within various properties are ongoing for the
remainder of the financial year. It is proposed that £36,000 is allocated for
these works in the current year and funded from the Salix Earmarked
Reserve. 
6.4.5  Lastly within Property Service Management, the Letham Community
Wellbeing Hub project has been completed. The contribution of £38,000 from
Letham4All is therefore no longer required and both the income and
expenditure budgets are reduced by this amount. 
6.4.6 Within Prudential Borrowing Projects, Decarbonisation Works at various
properties have not commenced as early as previously anticipated. Works are
currently still in the design phase and therefore unlikely to be commenced in
Page 65 of 88

Page 66

the current financial year. It is therefore proposed that £600,000 is moved to
next year in line with updated expenditure estimates. 
6.4.7 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I and II. 
6.5 Health and Social Care 
6.5.1 Within Occupational Therapy Equipment, with an aging population there is
increased demand for equipment, combined with an increased cost , resulting
in higher than previously budgeted costs in the current year. It is therefore
proposed that £100,000 is accelerated to the current year from 2029/30. In
addition, the rollout of the digital replacement for Technology Enabled
Telecare has concluded for the current phase this year, and with a lower than
anticipated refresh of the Digital Equipment installed. Consequently, it is
proposed that the underspend of £250,000 is transferred to Occupational
Therapy Equipment to supplement the increased demand and costs on the
budget. 
6.5.2 These proposed adjustments have been reflected in Appendices I and II. 
7. Housing Investment Programme 
7.1  The total current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2024/25 to 2028/29 remains
unchanged at £96.917 million. Movements across years from the previous
estimates are summarised in the table below and detailed in Appendix III. 
Approved 
20 Nov 2024
Current
Estimate
Movement 
£m £m £m
2024/25 28.161 31.513 3.352
2025/26       20.256       22.826 2.570
2026/27 15.633 15.633 0.000
2027/28 19.502 14.869 (4.633)
2028/29 13.365  12.076  (1.289)
Total 96.917 96.917 0.000 
Total Expenditure to 30 November 2024 (Housing Investment Programme) 
7.2 Net expenditure for 2024/25 to 30 November 2024 amounts to £15.975
million and receipts amount to £112,000. Therefore, the borrowing
requirement for the year to date is £15.863 million. 
7.3 The Strategic Leads for Housing and Communities and Property Services
have reviewed the Housing Investment Programme and proposed the budget
adjustments outlined below.
7.4 It is proposed to draw down various amounts from the Future Developments
New Build Programme in 2024/25, 2027/28 and 2028/29 to be applied as
follows: 
Page 66 of 88

Page 67

• Kinloch Gardens, Rattray. Estimated expenditure for new house building
for this project is £3.633 million, with Scottish Government grant of £1.944
million and £400,000 to be applied form the Second Home Council Tax
Reserve, thus leaving £1.289 million to be funded from the Future
Developments budget.
• National Trust Scotland, Dunkeld. Total estimated expenditure for the new
purchase of 20 properties in 2024/25 and 2025/26 is £5.448 million, with
Scottish Government grant of £1.947 million and £700,000 from the
Second Home Council Tax Reserve, thus leaving £2.801 million to be
funded from the Future Developments budget.
• Weavers Gait, Kinross. Estimated expenditure for new house building for
this project is £1.348 million, with £120,000 to be applied form the Second
Home Council Tax Reserve and £0.55 million of Commuted Sums, thus
leaving £0.678 million to be funded from the Future Developments budget
• Council House Buy-Backs. It is proposed to increase the budget by £3.890
million in 2024/25 to meet the ongoing purchase programme. It is
anticipated that further increases in the Buy-Back budget will be required
as the year progresses, with 90 property purchases completed by the
end of December 2024 and further purchases currently being progressed.
• Balhousie, Perth. It is proposed to transfer £37,000 in relation to fees in
the current year to further develop proposals for this site. 
7.5 It is also proposed to allocate part of the SHQS Future Developments Budget
in 2027/28 to current schemes in 2024/25, as follows: 
• Adaptations (OT) - £500,000 in 2024/25 for works approved under the
new OT Adaptations Referrals Policy approved by the Strategic Lead for
Housing and Communities in September 2024.
• Environmental Improvements - £41,000 for the removal of lead pipe work
at various locations. 
7.6   It is also proposed to move £500,000 for Rewiring, Infrastructure and Property
Refurbishments and £1.531 million for Multi-Storey Flats from the current
year to 2025/26. These movements reflect the level of anticipated works to be
completed in the current year. 
7.7 There has been an increase in Capital Receipts in the current year of
£28,000. Therefore, the borrowing requirement over the five-year programme
has reduced by this amount. 
8. BUDGET OVERVIEW 
8.1 The projected net expenditure outturn in 2024/25 for the Composite Capital
Budget is £161.728 million and represents 82% of the original 2024/25
budget approved on 24 April 2024 (£198.184 million). The revised budget is
based on the latest projections of expenditure and all budget adjustments
outlined within this report. 
8.2 Net expenditure to 30 November 2024 on the Composite Capital Budget is
£83.089 million and represents 51% of the proposed revised budget for
2024/25 of £161.728 million.
Page 67 of 88

Page 68

8.3 The projected net expenditure outturn in 2024/25 for the Housing Investment
Programme is £31.513 million and represents 146% of the original 2024/25
budget approved on 26 April 2024 (£21.536 million). This increase reflects the
allocation of future years block budgets to specific projects in 2024/25 and the
increase in the Council House Buy-Back programme. 
8.4 Net expenditure to 30 November 2024 on the Housing Investment Programme
is £15.975 million which represents 51% of the proposed revised budget for
2024/25 of £31.513 million. 
8.5 The Council’s total Borrowing Requirement to 30 November 2024, based on
the Composite and Housing Investment Programmes, is £76.427 million. The
estimated overall Council Borrowing Requirement for 2024/25 as a whole has
reduced by £3.154 million to £158.605 million as a result of the monitoring
adjustments reflected within this report. This reflects a reduction in estimated
borrowing in the current year on the Composite Programme of £6.478 million,
and an increase on the Housing Investment Programme of £3.324 million. 
8.6 In the context of the Capital Budget, the borrowing above refers specifically to
the funding of capital expenditure and therefore the need to borrow. The
actual amounts and timing of the borrowing is undertaken as part of the
Council’s Treasury Management operations and reported within the Treasury
Activity and Compliance reports throughout the year. 
Author(s)
Name  Designation Contact Details
John Jennings Senior Accountant CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date
Scott Walker Chief Finance Officer 21 January 2025 
Page 68 of 88

Page 69

ANNEX 
1. Implications, Assessments, Consultation and Communication 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 69 of 88

Page 70

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Executive Leadership Team and the Strategic Leadership Team have
been consulted in the preparation of this report.   
Page 70 of 88

Page 71

2. Background Papers 
No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. Appendices 
Appendix I – Composite Capital Programme - Estimated Capital Resources
2024/25 to 2029/30
Appendix II – Composite Capital Programme - Summary of Capital Resources
and Expenditure 2024/25 to 2029/30        
Appendix III – HRA Capital Investment Programme – Summary of Capital
Resources and Expenditure 2024/25 to 2028/29 
Appendix IV – Significant Capital Projects Progress Update
Page 71 of 88

Page 72

Page 72 of 88

Page 73

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2024/25 to 2029/30
APPENDIX I
Capital Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources Resources
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
Capital Grants
Recycling Improvement Fund 98 0 0 0 0 0 98
Road Safety Initiaive Fund 383 0 0 0 0 0 383
General Capital Grant 26,928 13,414 19,255 12,750 12,750 12,750 97,847
Total Capital Grants 27,409 13,414 19,255 12,750 12,750 12,750 98,328
General Capital Receipts
General Fund - Capital Receipts 413 507 0 0 0 0 920
General Fund - Ring Fenced Receipts 552 578 844 994 981 1,019 4,968
Total General Capital Receipts 965 1,085 844 994 981 1,019 5,888
Commercial Property Receipts
Capital Receipts brought-forward 2,102 1,120 1,550 1,550 2,638 2,638 2,102
Commercial Property Capital Receipts 713 430 0 1,088 0 0 2,231
Capital Receipts carried-forward (1,120) (1,550) (1,550) (2,638) (2,638) (2,638) (2,638)
Total Commercial Property Receipts Applied 1,695 0 0 0 0 0 1,695
Contributions
Tay Cities Deal (69) 550 505 3,945 500 956 6,387
Developer Contributions 3,707 2,367 2,600 2,600 2,500 2,500 16,274
Other Third Party Contributions 1,485 0 2,000 3,000 1,000 1,000 8,485
Revenue Budget Contributions 84 124 124 124 0 0 456
Total Contributions 5,207 3,041 5,229 9,669 4,000 4,456 31,602
Capital Borrowing Requirement 129,037 110,471 108,060 63,380 46,818 28,298 486,064
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 164,313 128,011 133,388 86,793 64,549 46,523 623,577
6
Page 73 of 88

Page 74

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2024/25 to 2029/30
APPENDIX I
Movements in Resources from Approved Budget - 20 November 2024
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Increase/(Decrease) in:
Capital Receipts - General Fund 0 0 0 0 0 0 0
Capital Receipts - Commercial Property 0 0 0 0 0 0 0
Capital Receipts - Ring Fenced (37) 226 (58) (53) 31 39 148
Capital Grants:
Active Travel 0 0 0 0 0 0 0
Recycling Improvement Fund 0 0 0 0 0 0 0
Road Safety Initiaive Fund 383 0 0 0 0 0 383
Inspiring School Age Childcare Spaces 0 0 0 0 0 0 0
Gypsy Travellers Improvements 0 0 0 0 0 0 0
General Capital Grant (175) 175 0 0 0 0 0
Tay Cities Deal 0 0 0 0 0 0 0
Third Party Contributions 301 0 0 0 0 0 301
Revenue Contributions 36 0 0 0 0 0 36
Developer Contributions 0 0 0 0 0 0 0
Resources b/f 0 0 0 0 0 0 0
Resources c/f to future years 0 0 0 0 0 0 0
Borrowing Requirement (6,478) 10,433 (3,239) 1,884 (1,269) (1,294) 37
Total Increase/(Decrease) in Resources (5,970) 10,834 (3,297) 1,831 (1,238) (1,255) 905
Approved Resources 20 November 2024 170,283 117,177 136,685 84,962 65,787 47,778 622,672
(Includes Crieff Drummond Arms under seperate report - £3M in 2025/26)
Revised Resources 164,313 128,011 133,388 86,793 64,549 46,523 623,577
Page 74 of 88

Page 75

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Approved Proposed Revised Actuals Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
20-Nov-24 Adjustment 30-Nov-24
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE 37,187 (6,377) 30,810 15,666 30,810 46,773 36,167 22,639 17,896 16,103 170,388
HOUSING & COMMUNITIES 1,829 0 1,829 577 1,829 4,009 1,493 1,558 1,500 1,500 11,889
ECONOMY, DEVELOPMENT & PLANNING 51,840 (972) 50,868 22,825 50,868 12,457 32,843 (5,862) (2,150) (2,636) 85,520
PROPERTY SERVICES 68,197 615 68,812 40,834 68,812 55,876 52,803 48,867 35,000 22,500 283,858
CUSTOMER & DIGITAL SERVICES 8,418 (71) 8,347 2,614 8,347 5,995 5,219 10,222 8,502 5,911 44,196
HEALTH & SOCIAL CARE 962 100 1,062 573 1,062 1,649 1,390 1,306 1,320 170 6,897
UNALLOCATED CAPITAL RESOURCES 0 52 52 0 52 0 0 0 0 0 52
TOTAL NET EXPENDITURE 168,433 (6,653) 161,780 83,089 161,780 126,759 129,915 78,730 62,068 43,548 602,800
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (27,103) 175 (26,928) (20,284) (26,928) (13,414) (19,255) (12,750) (12,750) (12,750) (97,847)
DEVELOPER CONTRIBUTIONS (3,707) 0 (3,707) 0 (3,707) (2,367) (2,600) (2,600) (2,500) (2,500) (16,274)
CAPITAL RECEIPTS (1,126) 0 (1,126) (378) (1,126) (937) 0 (1,088) 0 0 (3,151)
ANNUAL BORROWING REQUIREMENT 136,497 (6,478) 130,019 62,427 130,019 110,041 108,060 62,292 46,818 28,298 485,528
CAPITAL RECEIPTS BROUGHT FORWARD (2,102) 0 (2,102) (2,102) (2,102) (1,120) (1,550) (1,550) (2,638) (2,638) (2,102)
CAPITAL RECEIPTS CARRIED FORWARD 1,120 0 1,120 239 1,120 1,550 1,550 2,638 2,638 2,638 2,638
TOTAL NET BORROWING REQUIREMENT 135,515 (6,478) 129,037 60,564 129,037 110,471 108,060 63,380 46,818 28,298 486,064
6
Page 75 of 88

Page 76

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 30-Nov-24
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..) 335 383 718 15 718 362 362 361 400 400 2,603
Scottish Government Grant 0 (383) (383) (383) 0 0 0 0 0 (383)
Road Safety Initiatives - A94 Safety Improvements 84 84 84 0 0 0 0 0 84
Active Travel Grant -Traffic & Road Safety Schemes 739 77 816 251 816 600 600 600 600 600 3,816
Third Party Contribution 0 (77) (77) (77) 0 0 0 0 0 (77)
Additional Road Safety - Pedestrian Crossings 60 60 60 246 153 0 0 0 459
Schools Road Safety Measures 122 122 185 122 0 0 0 0 0 122
20mph Signage Programme - Schools 128 128 3 128 0 0 0 0 0 128
20mph Signage Programme 39 39 25 39 0 0 0 0 0 39
Car Parking Investment - Pitlochry 205 205 94 205 0 0 0 0 0 205
Revenue Contribution (55) (55) (55) 0 0 0 0 0 (55)
Sub-Total 1,657 0 1,657 573 1,657 1,208 1,115 961 1,000 1,000 6,941
Asset Management - Roads & Lighting
Structural Maintenance 10,911 2,436 13,347 9,422 13,347 8,963 8,963 8,964 8,320 8,320 56,877
Third Party Contribution 0 (262) (262) (114) (262) 0 0 0 0 0 (262)
Revenue Contribution 0 0 (16) 0 0 0 0 0 0 0
Traffic Signal Renewals - Upgrading 173 173 77 173 100 100 100 100 100 673
Footways 415 207 622 500 622 368 368 368 341 341 2,408
Street Lighting 0 0 0 0 0 0 600 600 1,200
Investment in Local Footpaths 0 0 0 20 100 0 0 0 120
Road Safety Barriers 22 22 24 22 0 0 0 0 0 22
Sub-Total 11,521 2,381 13,902 9,893 13,902 9,451 9,531 9,432 9,361 9,361 61,038
Asset Management - Bridges
Bridge Refurbishment Programme 1,233 50 1,283 575 1,283 2,723 2,520 3,201 2,000 2,000 13,727
Vehicular Bridge Parapets Programme - Assess & Upgrade 1 1 1 33 0 0 0 0 34
Old Perth Bridge - Strengthening 155 155 25 155 2,380 0 0 0 0 2,535
Perth Queens Bridge - Strengthening 59 59 44 59 154 2,143 0 0 0 2,356
Garry Viaduct 372 (326) 46 15 46 321 515 1,790 1,690 0 4,362
Culteuchar Culvert 8 5 13 14 13 0 0 0 0 0 13
Sub-Total 1,828 (271) 1,557 673 1,557 5,611 5,178 4,991 3,690 2,000 23,027
Improvement Schemes
A977 Upgrades 1 4 5 5 173 0 0 0 0 178
Broich Road, Crieff - Road Realignment & Safety Measures 0 0 0 18 0 0 0 0 18
Sub-Total 1 4 5 0 5 191 0 0 0 0 196
Rural Flood Protection Schemes
Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 259 259 49 259 0 0 0 0 0 259
Comrie Flood Protection Scheme 10,475 (4,282) 6,193 456 6,193 21,481 7,830 0 0 0 35,504
Milnathort Flood Protection Scheme 256 (184) 72 2 72 267 0 0 0 0 339
South Kinross Flood Protection Scheme 418 (179) 239 58 239 1,962 8,823 3,150 75 0 14,249
Scone Flood Protection Scheme 50 50 2 50 69 68 535 45 0 767
Flood Mitigation Measures - Dunkeld and Craigie Burn 8 8 7 8 72 48 180 375 317 1,000
Coastal Change Adaptation 100 (52) 48 1 48 52 0 0 0 0 100
Sub-Total 11,566 (4,697) 6,869 575 6,869 23,903 16,769 3,865 495 317 52,218
Climate Change
Nature Restoration 232 232 22 232 0 0 0 0 0 232
Sub-Total 232 0 232 22 232 0 0 0 0 0 232
Waste Strategy
Recycling Improvement Fund 202 (104) 98 98 98 0 0 0 0 0 98
Scottish Government Grant (98) (98) (98) (98) 0 0 0 0 0 (98)
Sub-Total 104 (104) 0 0 0 0 0 0 0 0 0
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins 267 267 132 267 200 200 200 220 220 1,307
Wheeled Bin Replacement Programme - Commercial Bins 57 104 161 104 161 20 20 20 25 25 271
Recycling Containers, Oil Banks & Battery Banks Replacement Progr 209 209 131 209 105 105 105 70 70 664
Capital Receipts - Disposals (2) (2) (5) (2) 0 0 0 0 0 (2)
Page 76 of 88

Page 77

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 30-Nov-24
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Litter Bins 50 50 8 50 50 50 50 55 55 310
Vehicle Replacement Programme 9,271 (3,776) 5,495 3,288 5,495 5,777 2,942 2,692 3,311 3,394 23,611
Capital Receipts - Vehicle Disposals (587) 37 (550) (222) (550) (578) (294) (269) (331) (339) (2,361)
Street Lighting Renewal - LED & Column Replacement 1,013 (55) 958 494 958 835 551 592 0 0 2,936
Sub Total 10,278 (3,690) 6,588 3,930 6,588 6,409 3,574 3,390 3,350 3,425 26,736
TOTAL - ENVIRONMENT & INFRASTRUCTURE 37,187 (6,377) 30,810 15,666 30,810 46,773 36,167 22,639 17,896 16,103 170,388
HOUSING & COMMUNITIES
Community Greenspace
Play Areas - Improvements Implementation Strategy 641 641 150 641 872 150 150 500 500 2,813
Third Party Contribution (4) (4) (4) 0 0 0 0 0 (4)
3G Pitch, Blairgowrie 117 117 75 117 0 0 0 0 0 117
Settlement/Neighbourhood Parks 250 250 109 250 300 0 0 0 0 550
Third Party Contribution (84) (84) (84) 0 0 0 0 0 (84)
Countryside Sites 0 0 0 0 0 139 0 0 139
Community Greenspace Sites 0 0 0 654 898 894 700 700 3,846
Community Greenspace Bridges 197 197 94 197 0 0 0 0 0 197
Third Party Contribution (13) (13) (13) 0 0 0 0 0 (13)
Revenue Contribution 0 0 0 0 0 0 0 0 0
Core Path Implementation 110 110 110 0 0 0 0 0 110
Third Party Contribution (110) (110) (110) 0 0 0 0 0 (110)
Premier Parks 46 46 21 46 0 0 0 0 0 46
Third Party Contribution (14) (14) (10) (14) 0 0 0 0 0 (14)
Kinnoull Hill 8 8 8 0 0 0 0 0 8
Cemetery Extensions 13 13 13 13 60 445 375 300 300 1,493
Sub-Total 1,157 0 1,157 452 1,157 1,886 1,493 1,558 1,500 1,500 9,094
Housing Projects
Gypsy Travellers Site Improvement Works 185 185 2 185 0 0 0 0 0 185
Additional Gypsy Traveller Site Improvement Works 225 225 18 225 0 0 0 0 0 225
New Gypsy Traveller Site 6 6 6 1,990 0 0 0 0 1,996
Sub Total 416 0 416 20 416 1,990 0 0 0 0 2,406
Public Transport
Community Transport Iniatives 181 181 105 181 18 0 0 0 0 199
Sub-Total 181 0 181 105 181 18 0 0 0 0 199
Prudential Borrowing Projects
Community Transport Vehicles 0 0 0 115 0 0 0 0 115
Sub Total 0 0 0 0 0 115 0 0 0 0 115
Community Planning
Community-Led Asset Transfers 75 75 75 0 0 0 0 0 75
Sub-Total 75 0 75 0 75 0 0 0 0 0 75
TOTAL - HOUSING & COMMUNITIES 1,829 0 1,829 577 1,829 4,009 1,493 1,558 1,500 1,500 11,889
ECONOMY, DEVELOPMENT & PLANNING
Improvement Schemes
A9/A85 Road Junction Improvements 212 212 212 0 0 0 0 0 212
Cross Tay Link Road (CTLR) 44,745 44,745 20,102 44,745 0 0 0 0 0 44,745
Bertha Park Link Road 686 686 594 686 400 10,000 1,808 0 0 12,894
Sub-Total 45,643 0 45,643 20,696 45,643 400 10,000 1,808 0 0 57,851
Perth & Kinross Place-making
Perth, Place, People 0 0 0 0 3,598 0 0 0 3,598
Perth City Centre Golden Route (Rail Station) 68 (45) 23 24 23 45 0 0 0 0 68
City Greening 31 (31) 0 0 31 0 0 0 0 31
Perth & Kinross Lighting Action Plan 1,320 (844) 476 77 476 844 0 0 0 0 1,320
Sub-Total 1,419 (920) 499 101 499 920 3,598 0 0 0 5,017
Other Planning Projects
Creative Exchange (former St. John's Primary School) 52 (52) 0 0 0 0 0 0 0 0
Page 77 of 88

Page 78

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 30-Nov-24
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Local Full Fibre Network 0 0 0 0 0 0 0 0 0
Third Party Contribution - Tay Cities Deal 0 0 (53) 0 0 0 0 0 0 0
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers (74) (74) 5 (74) 0 0 0 0 0 (74)
Third Party Contribution - ERDF (2) (2) (2) 0 0 0 0 0 (2)
Third Party Contribution - Tay Cities Deal 69 69 69 0 0 0 0 0 69
Revenue Contribution 7 7 7 0 0 0 0 0 7
Perth Eco-Innovation Park at Perth West 780 780 135 780 9,737 22,300 0 0 0 32,817
Third Party Contributions - Tay Cities Deal 0 0 0 (550) (505) (3,945) (500) (956) (6,456)
Other Third Party Contributions 0 0 0 0 (2,000) (3,000) (1,000) (1,000) (7,000)
Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 (550) (725) (650) (680) (2,605)
Economic Development Investment - Land & Serviced Units 1,000 1,000 1,000 1,000 0 0 0 0 2,000
Adapt Your Property - Vacant Town & City Centre Space 300 300 9 300 0 0 0 0 0 300
Sub-Total 2,132 (52) 2,080 96 2,080 10,187 19,245 (7,670) (2,150) (2,636) 19,056
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units 43 43 43 0 0 0 0 0 43
Broxden Business Park - Additional Infrastructure 6 6 6 0 0 0 0 0 6
Western Edge, Kinross - Site Servicing (17) (17) 17 (17) 0 0 0 0 0 (17)
Broxden Drainage Mitigation Works 1,225 1,225 1,915 1,225 0 0 0 0 0 1,225
Third Party Contribution (Scottish Water) (919) (919) (919) 0 0 0 0 0 (919)
Ruthvenfield Business Centre 1,356 1,356 1,356 0 0 0 0 0 1,356
North Muirton Drainage 2 2 2 0 0 0 0 0 2
Sub-Total 1,696 0 1,696 1,932 1,696 0 0 0 0 0 1,696
Prudential Borrowing Projects
Land Purchase & Development (Hotel Development) 950 950 950 950 0 0 0 0 1,900
Sub Total 950 0 950 0 950 950 0 0 0 0 1,900
TOTAL - ECONOMY, DEVLOPMENT & PLANNING 51,840 (972) 50,868 22,825 50,868 12,457 32,843 (5,862) (2,150) (2,636) 85,520
PROPERTY SERVICES
Project Support
Investment in the Learning Estate 1,591 1,591 1,081 1,591 13,050 8,650 6,823 0 0 30,114
Methven Primary School Refurbishment 206 206 42 206 3,500 300 0 0 0 4,006
Kirkmichael Primary School Upgrades 25 25 25 25 0 0 0 0 0 25
North/West Perth - New Primary School 0 0 0 341 7,672 15,400 0 0 23,413
Riverside Primary New School 483 483 324 483 0 0 0 0 0 483
Perth Academy - Refurbishment 1,699 1,351 3,050 2,291 3,050 1,650 299 0 0 0 4,999
Perth Grammar School - Upgrade Programme Phase 3 1,000 1,000 538 1,000 1,500 1,488 0 0 0 3,988
Perth High School - Internal Services & Refurbishment 12 12 12 0 0 0 0 0 12
Perth High School - New School Investment 40,899 40,899 21,831 40,899 6,600 3,600 0 0 0 51,099
Harris Academy/Invergowrie - Extension 591 591 21 591 0 0 0 0 0 591
Blairgowrie Recreation Centre - Replacement 15,327 15,327 11,744 15,327 1,303 0 0 0 0 16,630
Technology Upgrades 76 39 115 82 115 771 483 0 0 0 1,369
Sub-Total 61,909 1,390 63,299 37,979 63,299 28,715 22,492 22,223 0 0 136,729
Project & Contracts
Free School Meal Expansion Programme 0 0 0 1,000 2,511 0 0 0 3,511
Community Campus Access Adaptations 15 (15) 0 0 25 0 0 0 0 25
Sub-Total 15 (15) 0 0 0 1,025 2,511 0 0 0 3,536
Property Service Manager
DDA Adaptation & Alteration Works Programme 230 (100) 130 28 130 300 200 200 0 0 830
Property Compliance Works Programme 1,017 1,017 657 1,017 650 650 400 0 0 2,717
Capital Improvement Projects Programme 2,265 2,265 1,285 2,265 1,800 1,800 894 10,000 10,000 26,759
Pitlochry High School - Upgrade Programme 164 (60) 104 97 104 60 0 0 0 0 164
Friarton Depot - Waste Transfer Station 250 250 143 250 2,531 0 0 0 0 2,781
Energy Efficiency Works - Various Properties 0 36 36 36 0 0 0 0 0 36
Revenue Contribution (Salix Reserve) 0 (36) (36) (36) 0 0 0 0 0 (36)
Letham Community Wellbeing Hub 133 (38) 95 95 0 0 0 0 0 95
Third Party Contribution (Letham4All) (38) 38 0 0 0 0 0 0 0 0
PH2O 500 500 500 2,000 25,000 25,000 25,000 12,500 90,000
Crieff Drummond Arms - Regeneration 0 0 0 3,000 0 0 0 0 3,000
Page 78 of 88

Page 79

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment 30-Nov-24
Report 2 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3 Report 3
2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Perth Museum 167 167 167 0 0 0 0 0 167
Perth Art Gallery 100 100 100 2,795 0 0 0 0 2,895
Sub-Total 4,788 (160) 4,628 2,210 4,628 13,136 27,650 26,494 35,000 22,500 129,408
Prudential Borrowing Projects
Decarbonisation 1,339 (600) 739 558 739 600 0 0 0 0 1,339
Energy Conservation & Carbon Reduction Programme 146 146 87 146 150 150 150 0 0 596
Pullar House - Purchase & Re-Purposing 0 0 0 10,000 0 0 0 0 10,000
Kinnoull Street Car Park - Purchase 0 0 0 2,250 0 0 0 0 2,250
Sub-Total 1,485 (600) 885 645 885 13,000 150 150 0 0 14,185
TOTAL - PROPERTY SERVICES 68,197 615 68,812 40,834 68,812 55,876 52,803 48,867 35,000 22,500 283,858
CUSTOMER & DIGITAL SERVICES
ICT Infrastructure Replacement and Upgrade Programme 4,927 4,927 1,308 4,927 3,112 3,273 7,698 6,472 3,687 29,169
Data & Analytics 600 600 28 600 1,206 720 708 716 733 4,683
Supporting Digital 750 750 161 750 1,175 928 1,185 914 920 5,872
Software Licences (Revenues & Benefits) 51 51 52 51 51 51 49 0 0 202
School Audio-Visual (AV) Equipment Replacement Programme 196 (71) 125 231 125 35 106 35 300 471 1,072
Mosaic - Swift Social Work System Replacement 1,712 1,712 828 1,712 430 180 586 0 0 2,908
Revenue Contribution 0 0 0 (124) (124) (124) 0 0 (372)
Hardware 22 22 6 22 15 14 14 25 25 115
Licenses 80 80 80 95 71 71 75 75 467
Case Management System 80 80 80 0 0 0 0 0 80
TOTAL - CUSTOMER & DIGITAL SERVICES 8,418 (71) 8,347 2,614 8,347 5,995 5,219 10,222 8,502 5,911 44,196
HEALTH & SOCIAL CARE
Occupational Therapy Equipment 300 350 650 226 650 250 250 150 250 100 1,650
Technology Enabled Telecare 610 (250) 360 333 360 1,088 1,087 1,087 1,000 0 4,622
Moving & Handling Office Refurbishment 0 0 0 29 0 0 0 0 29
Software Licences 52 52 14 52 53 53 69 70 70 367
Developing Supported Tenancies 0 0 0 229 0 0 0 0 229
TOTAL - HEALTH & SOCIAL CARE 962 100 1,062 573 1,062 1,649 1,390 1,306 1,320 170 6,897
Unallocated Capital Resources 0 52 52 52 0 0 0 0 0 52
TOTAL COMPOSITE NET EXPENDITURE 168,433 (6,653) 161,780 83,089 161,780 126,759 129,915 78,730 62,068 43,548 602,800
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
CAPITAL INCOME & RECEIPTS
General Capital Grant - Scottish Government (27,103) 175 (26,928) (20,284) (26,928) (13,414) (19,255) (12,750) (12,750) (12,750) (97,847)
Developer Contributions (3,707) (3,707) (3,707) (2,367) (2,600) (2,600) (2,500) (2,500) (16,274)
General Fund - Capital Receipts/Disposal (413) 0 (413) (309) (413) (507) 0 0 0 0 (920)
Commercial Property - Capital Receipts/Disposal (713) 0 (713) (69) (713) (430) 0 (1,088) 0 0 (2,231)
Total: Capital Receipts (31,936) 175 (31,761) (20,662) (31,761) (16,718) (21,855) (16,438) (15,250) (15,250) (117,272)
Annual Composite Borrowing Requirement 136,497 (6,478) 130,019 62,427 130,019 110,041 108,060 62,292 46,818 28,298 485,528
CAPITAL RECEIPTS BROUGHT FORWARD (2,102) 0 (2,102) (2,102) (2,102) (1,120) (1,550) (1,550) (2,638) (2,638) (2,102)
CAPITAL RECEIPTS CARRIED FORWARD 1,120 0 1,120 239 1,120 1,550 1,550 2,638 2,638 2,638 2,638
TOTAL NET COMPOSITE BORROWING REQUIREMENT 135,515 (6,478) 129,037 60,564 129,037 110,471 108,060 63,380 46,818 28,298 486,064
Page 79 of 88

Page 80

Project Project Description
ENVIRONMENT & INFRASTRUCTURE
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety
Road Safety Initiatives - A94 Safety Improvements A programme of works to improve road safety
Active Travel Grant - Traffic & Road Safety Schemes A programme of works to improve active travel
Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities
Schools Road Safety Measures A programme of works to improve road safety in the vicinity of schools
20mph Signage Programme - Schools A programme of works to improve road safety in the vicinity of schools
20mph Signage Programme A programme of works to introduce 20mph speed limits.
Car Parking Investment - Pitlochry Purchase of land and construction of a public car park
Roads & Lighting
Structural Maintenance
Road maintenance to extend the life of roads, including predominately road
resurfacing, surface dressings, installing new drainage infrastructure and repairs
to and replacement of defective embankments and retaining walls
Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal infrastructure
Footways Replacement of existing  deteriorated footway surfaces
Street Lighting Replacement of existing street lighting lanterns, columns and cable network.
Investment in Local Footpaths A programme of works to improve and provide local footpaths
Road Safety Barriers Renewal of existing barriers where unrecoverable damage has occurred and
renewal of barriers where timber posts have been used in construction
Bridges
Bridge Refurbishment Programme Used to appoint specialist external inspection teams and consultants to carry out
specialist access bridge inspections and assessments
Vehicular Bridge Parapets Programme - Assess &
Upgrade Assessment and Upgrading of Vehicle Parapets Programme
Old Perth Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a
range of assessment, investigation, strengthening and improvement works
Perth Queens Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a
range of assessment, investigation, strengthening and improvement works
Garry Viaduct
Replacement of Bearings and Parapets; including strengthening of deck for
bearing replacement jacking up, and to cater for increased parapet vehicular
deterrent capacity
Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert
Improvement Schemes
A977 Upgrades A programme of works to improve road safety along the A977.
Broich Road, Crieff - Road Realignment & Safety
Measures Complete
Rural Flood Protection Schemes
Perth Flood Protection Scheme (South Inch Culvert
Reinstatement)
Ground investigation and monitoring then design project to refurbish existing
culvert
Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Comrie
Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Milnathort
South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in South
Kinross
Scone Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Scone
Flood Mitigation Measures - Dunkeld and Craigie
Burn
Design and construction of schemes to reduce the risk of flooding in Dunkeld and
Craigie Burn
Coastal Change Adaptation Design and construct projects to deal with incidents of coastal erosion
Climate Change
Nature Restoration
Protection and restoration of biodiversity focusing on over-exploitation of the
natural environment and addressing its consequences; habitat loss and
fragmentation; and invasive non-native species.
Waste Strategy
Recycling Improvement Fund Complete
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic
Bins
Replacement of damaged and end of life wheeled bins for households. Also
suppling bins for new properties
Wheeled Bin Replacement Programme -
Commercial Bins Replacement of damaged and end of life wheeled bins for commercial customers.
Also suppling bins for new customers and changes to collection contracts
Recycling Containers, Oil Banks & Battery Banks
Replacement Programme Replacement of damaged and end of life oil and battery banks
Litter Bins Replacement of damaged and end of life litter bins and/or for general supply of
litter bins where required.
Vehicle Replacement Programme Fleet vehicle replacement programme
Page 80 of 88

Page 81

Project Project Description
Street Lighting Renewal - LED & Column
Replacement Street Lighting LED conversion and column replacement programme
HOUSING & COMMUNITIES
Community Greenspace
Play Areas - Improvements Implementation Strategy Regular refurbishment of 146 play areas based on approx. 6-8 per year.  Involves
community engagement and often co-funding and design of the sites
3G Pitch, Blairgowrie Two phase community led project to provide a new full sized 3G football pitch and
pavilion
Settlement/Neighbourhood Parks Refurbishment of neighbourhood parks working in partnership with communities to
improve, update and renew worn out or obsolete infrastructure
Countryside Sites Refurbishment of more natural parks and open spaces
Community Greenspace Sites Main fund for all Community Greenspace Sites which is drawn down to support
the overall capital programme of refurbishments and upgrades
Community Greenspace Bridges Refurbishment programme for all bridges on Community Greenspace sites
Core Path Implementation Holding budget for Crieff Comrie Core path development mainly funded through
Sustrans
Premier Parks Small budget to facilitate refurbishment of former Premier Park upgrades
Kinnoull Hill Complete
Cemetery Extensions Funding to allow the extension of existing or development of new cemeteries to
address the pressure for burial space
Housing Projects
Gypsy Travellers Site Improvement Works Programme of works for improvements on Gypsy Traveller sites at Bobbin Mill and
Double Dykes
Additional Gypsy Traveller Site Improvement Works Additional funding to support improvements works programme on Gypsy Traveller
sites
New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site
Public Transport
Community Transport Iniatives
Purchase of vehicles and charging infrastructure for community
transport/resilience groups to use to deliver on unmet need in the local area.
Community Planning
Community-Led Asset Transfers
Financial assistance for community groups wishing to take on PKC assets using
the community asset transfer process
ECONOMY, DEVELOPMENT & PLANNING
Improvement schemes
A9/A85 Road Junction Improvements
New infrastructure including a new A9 overbridge, a bridge over the River Almond
and road linking the A85 to Inveralmond and Bertha Park (Phase 1 of Perth
Transport Futures Project) - Complete
Cross Tay Link Road (CTLR)
New road and major structure over the River Tay, linking the A9 north of
Inveralmond and the A94 north of Scone (Phase 2 of Perth Transport Futures
Project).
Bertha Park Link Road
Phase 3 of Perth Transport Futures Project which is a new link road (1.4km)
running through Bertha Park, connecting Phases 1 and 2. Status - specimen
design underway.
Perth & Kinross Place-making
Perth, Place, People
Design and development of sustainable transport corridors to improve access to
and from Perth and enable additional development and improvement within Perth
city centre
Perth City Centre Golden Route (Rail Station)
Design and development of improvements to access, signage and animation from
rail and bus station to Perth city centre to complement improvements to integration
of transport
City Greening Improvements to support enhancement of retail trading environment and
residential areas and enhanced use of space for markets, events and alfresco use
Perth & Kinross Lighting Action Plan
Architectural and creative lighting to enhance city and towns appearance, reduce
energy cost and increase safety at nighttime to increase dwell time, support the
hospitality sector, events and grow the evening economy
Other Planning Projects
Creative Exchange (former St. John's Primary
School)
Repurposing old school to offer space to creative industry businesses and create
the Famous Grouse Idea Centre, a space to support business innovation.
Complete
Local Full Fibre Network Provision of gigabit fibre connectivity to Council's buildings to unlock gigabit
connectivity for surrounding communities. Complete
Low Carbon Transport & Active Travel Hub -
Broxden EV Chargers
Provision of fast EV chargers combined with solar power generation and battery
storage at Broxden Park & Ride - Near completion
Page 81 of 88

Page 82

Project Project Description
Perth Eco-Innovation Park at Perth West
Provision of enabling infrastructure (access road, A9 underpass and unit
platforms) to develop 25ha of employment land supporting clean growth, business
innovation and jobs - Phase 1 (11ha).
Economic Development Investment - Land &
Serviced Units
Provision of serviced lands and business units - Additional business units (eg
Northfields Business Park and Kinross Business Park) - procurement for design in
progress followed by construction.
Adapt Your Property - Vacant Town & City Centre
Space
Adapt Your Property supports capital adaptation works to empty and underused
commercial property in city & town centres, looking at adaptation to attract new
commercial, community or residential use.
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing &
Provision of Units Only road adoption works remaining
Broxden Business Park - Additional Infrastructure Only road adoption works remaining
Western Edge, Kinross - Site Servicing Only road adoption works remaining
Broxden Drainage Mitigation Works Drainage/pumping station works underway and subject to agreement/contribution
from Scottish Water
Ruthvenfield Business Centre Works on redevelopment in progress
North Muirton Drainage Drainage/pumping station underway
Prudential Borrowing Project
Land Purchase & Development (Hotel Development) Development agreement secured and release of grant for heritage subject to
progression through planning and cost evidence
STRATEGY, PEOPLE & RESOURCES
Property Services - Project Support
Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our existing school
estate
Methven Primary School Refurbishment Upgrade of Methven Primary School facilities
Kirkmichael Primary School Upgrades Upgrade of Kirkmichael Primary School facilities
North/West Perth - New Primary School New primary school located at Bertha Park
Riverside Primary New School Replacement of North Muirton and Balhousie primary schools
Perth Academy - Refurbishment Investment to upgrade the infrastructure and environment of the Perth Academy
including structural work to sports block, lighting upgrades, classroom upgrades
and science block cladding
Perth Grammar School - Upgrade Programme Phase
3
Investment to upgrade the infrastructure and environment of the Perth Grammar
School including structural work to assembly hall, AV and WiFi upgrades,
classroom refurbishment and door upgrades
Perth High School - Internal Services &
Refurbishment
Necessary works to the infrastructure and environment of the current Perth High
School
Perth High School - New School Investment Replacement of the existing Perth High School
Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy in Dundee for
continuation of access for pupils based in Invergowrie
Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie
Technology Upgrades Upgrade to practical teaching environment within the existing school estate
Property Services - Projects & Contracts
Free School Meal Expansion Programme Upgrading kitchen and dining facilities to provide the enhanced Free School Meals
programme
Community Campus Access Adaptations To support adaptations in schools and community campuses to help facilitate
increased community access
Property Services - Property Service Manager
DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council Buildings - e.g.
Ramps/Lifts/Door Access/Accessible Toilets and Changing Areas
Property Compliance Works Programme
To ensure compliance with current and changing legislation including - New Fire
Alarms; Lighting; Wiring; Fire Protection Works; Gas pipework within buildings
and Roof Restraint safety systems
Capital Improvement Projects Programme
Roof Upgrades; Full internal refurbishment works; New Heating Systems; Boilers
and pipework; Structural Upgrades; Small extensions; New Windows/Doors; New
Fencing; New Cladding
Pitlochry High School - Upgrade Programme
Upgrades to Mechanical and Electrical Infrastructure, including rewiring, heating
and controls systems, replacement lighting and consequential building works such
as new ceilings, painting and flooring
Friarton Depot - Waste Transfer Station
This project aims to refurbish the main waste transfer station building to provide a
safe environment for workers. The project will involve a complete re-cladding of
the existing structure, new doors and new services installation. Some initial
enabling work are being carried out currently.
Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to reduce energy cost across
the property estate
Letham Community Wellbeing Hub Complete
Page 82 of 88

Page 83

Project Project Description
PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink. On hold pending
outcome of Leisure and Culture Assets Review
Crieff Drummond Arms - Regeneration Demolition of former hotel, regeneration of site for housing use
Perth Museum Complete
Perth Art Gallery Refurbishment of temporary galleries - scheduled for completion November 2023
Prudential Borrowing Projects
Decarbonisation This budget will support PKCs path to NetZero and focus primarily on the de-
carbonisation of heat and replacing inefficient direct emissions heat sources
Energy Conservation & Carbon Reduction
Programme
This budget is focused on works to reduce PKC energy consumption and help
achieve annual KPI energy reduction of 3%
Pullar House - Purchase & Re-Purposing Purchase and development of Pullar House to create a shared Public Sector Hub
Kinnoull Street Car Park - Purchase
Purchase of Kinnoull Street Multi-Storey Car Park to increase Perth and Kinross
Council car parking capacity to support delivery of the Perth City Integrated
Investment Proposal
Customer & Digital Services
ICT Infrastructure & Replacement and Upgrade
Programme
This Programme delivers the IT / digital environment, digital resources and
systems required by staff and young people. The programme maintains, supports
and develops computers; networks; telephony; Microsoft systems; connectivity
and equipment; datacentres; servers; file storage and back up; security systems
and video conferencing
Data & Analytics
Delivers the governance, tools, technologies and organisation-wide skills required
for optimising value from Council data, driving informed decision making around
resources, priorities and service delivery targets
Supporting Digital
Develops the capabilities we need to be an innovative digital organisation. 
Including developing the Council’s corporate employee (mobile working) and
customer (online services) platforms, to create new digital products and services;
investment in tools such as Microsoft; resourcing innovation and building digital
skills, insight and expertise
Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team
School Audio-Visual (AV) Equipment Replacement
Programme Ensures all Perth and Kinross classrooms have equitable access to audio visual
panels and the digital skills to exploit these resources for learning and teaching
Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system to replace SWIFT
Hardware Funding of additional or bespoke IT Hardware for Communities Staff
Licenses Funding of software contracts
Case Management System New system for management of client cases
HEALTH & SOCIAL CARE
Occupational Therapy Equipment
Supply and install of occupational therapy equipment following referral from
heakth and social care professionals.
Technology Enabled Telecare
Replacement of existing analogue Community Alarm devices to digital alarm units
prior to UK switch-off of analogue network, as well as ongoing rolling replacement
programme.
Moving & Handling Office Refurbishment Relocate staff base, currently under review
Software Licences Various licences for essential social care systems
Developing Supported Tenancies Contribution towards flagship core and cluster facility for adults with learning
disabilities’
Page 83 of 88

Page 84

Page 84 of 88

Page 85

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
20-Nov-24 Adjustment 30-Nov-24
Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House New Build Programme
Fairfield, Perth 4 4 4 0 0 0 0 4   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
4 0 4 0 4 0 0 0 0 4
Lynedoch Road, Methven - Phase 2 1,175 1,175 1,059 1,175 0 0 0 0 1,175   
Council Tax (Second Income) (240) (240) (240) (240) 0 0 0 0 (240)
Scottish Government Subsidy 0 0 0 0 0 0 0 0
935 0 935 819 935 0 0 0 0 935
Lynedoch Road, Methven - Phase 3 1,097 1,097 804 1,097 0 0 0 0 1,097   
Council Tax (Second Income) (100) (100) (100) (100) 0 0 0 0 (100)
Scottish Government Subsidy (556) (556) (556) (556) 0 0 0 0 (556)
441 0 441 148 441 0 0 0 0 441
Beechgrove, Perth 0 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
Balhousie, Perth 0 37 37 37 37 0 0 0 0 37   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0
0 37 37 37 37 0 0 0 0 37
Kinloch Gardens, Rattray (20 units) 0 3,633 3,633 3,633 0 0 0 0 3,633   
Council Tax (Second Income) 0 (400) (400) (400) 0 0 0 0 (400)
Scottish Government Subsidy 0 (1,944) (1,944) (1,944) 0 0 0 0 (1,944)
0 1,289 1,289 0 1,289 0 0 0 0 1,289
Weavers Gait, Kinross (6 units) 0 1,348 1,348 1,348 0 0 0 0 1,348   
Council Tax (Second Income) 0 (120) (120) (120) 0 0 0 0 (120)
Scottish Government Subsidy 0 0 0 0 0 0 0 0   
Communted sums 0 (550) (550) (550) 0 0 0 0 (550)
0 678 678 0 678 0 0 0 0 678
Future Developments 3,314 (3,314) 0 1 0 6,014 6,014 6,200 4,725 22,953   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
3,314 (3,314) 0 1 0 6,014 6,014 6,200 4,725 22,953
Total Council House New Build 4,694 (1,310) 3,384 1,005 3,384 6,014 6,014 6,200 4,725 26,337
Increase in Council House Stock
Council House Buy-Backs 6,540 3,890 10,430 10,432 10,430 4,000 4,000 4,000 4,000 26,430
Scottish Government Subsidy (1,400) (1,400) (1,400) (1,400) 0 0 0 0 (1,400)
5,140 3,890 9,030 9,032 9,030 4,000 4,000 4,000 4,000 25,030
National Trust Scotland (NTS), Dunkeld
Purchase of properties (20 units) 0 4,909 4,909 4,909 539 0 0 0 5,448   
Council Tax (Second Income) 0 (700) (700) (700) 0 0 0 0 (700)
Scottish Government Subsidy 0 (1,947) (1,947) (1,947) 0 0 0 0 (1,947)
0 2,262 2,262 0 2,262 539 0 0 0 2,801
Total Increase in Council House stock 5,140 6,152 11,292 9,032 11,292 4,539 4,000 4,000 4,000 27,831
Lock-ups and Garage Sites 50 50 50 0 0 0 0 50
Standard Delivery Plan
Heating Upgrade Contract Works 1,335 1,335 475 1,335 1,320 811 0 0 3,466
Rewiring, Infrastructure & Property Refurbishment 1,628 (500) 1,128 733 1,128 1,350 0 0 0 2,478
Triple Glazing 1,116 1,116 1,069 1,116 0 0 0 0 1,116
Controlled Door Entry 34 34 43 34 0 0 0 0 34
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2028/29
PERTH AND KINROSS COUNCIL
6
Page 85 of 88

Page 86

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
20-Nov-24 Adjustment 30-Nov-24
Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2 Report 2
2024/25 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
- less Third Party Contribution (5) (5) (5) 0 0 0 0 (5)
Kitchen Modernisation Programme 1,352 1,352 612 1,352 2,025 0 0 0 3,377
Bathroom Modernisation Programme 998 998 498 998 0 0 0 0 998
Adaptations (OT) 0 500 500 155 500 0 0 0 0 500
External Fabric 1,684 1,684 977 1,684 0 0 0 0 1,684 
- less Third Party Contribution (77) (77) (77) 0 0 0 0 (77)
Energy Efficiency 472 472 117 472 0 0 0 0 472
Multi Storey Flats 1,835 (1,531) 304 24 304 1,531 0 0 0 1,835
Environmental Improvements 391 41 432 390 432 0 0 0 0 432
Fire Precaution Measures 83 83 73 83 0 0 0 0 83 
- less Third Party Contribution (20) (20) (20) 0 0 0 0 (20)
Sound Insulation 389 389 389 42 0 0 0 431
Structural 256 256 8 256 985 0 0 0 1,241
SHQS Future Developments 0 0 0 4,066 4,808 4,669 3,351 16,894
Total Standard Delivery Plan 11,471 (1,490) 9,981 5,174 9,981 11,319 5,619 4,669 3,351 34,939
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 10 10 9 10 0 0 0 0 10
Rannoch Road, Perth - Housing Regeneration 205 205 106 205 0 0 0 0 205
149-151 Dunkeld Road, Perth 20 20 1 20 0 0 0 0 20
St.Catherine's Square Redevelopment 3,393 3,393 7 3,393 0 0 0 0 3,393
Shops & Offices 50 50 50 239 0 0 0 289
Greyfriars and Satellite Sites 50 50 9 50 32 0 0 0 82
Double Dykes Chalet Replacement 5,949 5,949 461 5,949 573 0 0 0 6,522 
- Scottish Government Grant (3,426) (3,426) (19) (3,426) 0 0 0 0 (3,426)
General Capital Works 147 147 139 147 0 0 0 0 147
Upgrade and Replacements to Lifts Programme 121 121 121 0 0 0 0 121
ICT Expenditure 62 62 62 110 0 0 0 172
Mortgage to Rent 315 315 141 315 0 0 0 0 315 
- less Government Grant (90) (90) (90) (90) 0 0 0 0 (90)
Total Other Investment in Council House Stock 6,806 0 6,806 764 6,806 954 0 0 0 7,760
Total Net Expenditure 28,161 3,352 31,513 15,975 31,513 22,826 15,633 14,869 12,076 96,917
Income
CAPITAL RECEIPTS (84) (28) (112) (112) (112) 0 0 0 0 (112)
CFCR (1,833) (1,833) (1,833) (2,078) (2,004) (2,125) (2,340) (10,380)
TOTAL BORROWING REQUIREMENT 26,244 3,324 29,568 15,863 29,568 20,748 13,629 12,744 9,736 86,425
Page 86 of 88

Page 87

SIGNIFICANT CAPITAL PROJECTS
PROGRESS UPDATE
APPENDIX IV
Project Title Total
Gross
Budget
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On Site Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement
36,000 0 36,000 36,000 Summer 2025 - new
centre currently
scheduled to open early
2025
Yes Yes On track Yes Work on programme for phase 1 completion early 2025.
North/West Perth New
Primary School*
24,000 0 24,000 24,000 Summer 2026 No No On track No Project has been put on hold for 2 years due to slow
build out rates at Bertha Park.
Riverside Primary New
School
19,899 0 19,899 19,899 Early summer 2023 Yes Yes Complete No Project complete.
Perth High School - New
School Investment
80,200 0 80,200 80,200 Summer 2026 - school
building curently
scheduled to open
summer 2025
Yes Yes On track No Works are on programme.
Harris
Academy/Invergowrie
Extension
5,200 0 5,200 5,200 Late 2023 Yes Yes On track No Main extension complete.
Cross Tay Link Road
(CTLR) 150,500 40,000 110,500 110,500 Spring 2025 Yes Yes On programme No
Main superstructure works on Destiny Bridge are
complete with finishing works being undertaken and
progressing on programme.  Primarily finishing,
snagging and testing works are being undertaken
elsewhere.No change to completion date.  Risks
signficantly reduced in period, with weather being the
main risk, particuarly in relation to the bridge surfacing.
Comrie Flood Protection
Scheme 40,353 32,657 7,696 7,696 Autumn 2026 Yes Yes Contract awarded Yes
Works are on programme.
Site setup, site clearance and formation of construction
access routes are ongoing.
Main civils construction works are on target to
commence from February 2025.
Perth Eco Innovation Park* 32,817 16,061 16,756 16,756
Not currently
programmed No No
Design package
awarded - design
programme on track Yes
[See previous reports in relation to funding.] Amey
continue with the design works package, with innovation
workshops held along with regular design meetings
involving JDLT's representative. Key risks include
liaison with Transport Scotland and determination of
innovation scope.Positive discussions continue with
JDLT in terms of s75, planning and design with last
meeting held on 17 Dec 2025.
PH2O 90,000 0 90,000 90,000
Not currently
programmed No No
Thimblerow approved
as new site for Ph2O
project at Council on 4
September 2024. Yes
Project Board established, programme under
development, project no longer on hold.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 6-year programme.
6
Page 87 of 88

Page 88

Page 88 of 88