MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE
held BY MICROSOFT TEAMS on WEDNESDAY, 24 MAY 2023 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Amanda Hampsey
Councillor Daniel Hampsey
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Paul Donald Kennedy
Councillor Liz McCabe
Councillor Luna Martin
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Matt Mulderrig, Development Policy & Housing Manager
Sandra Davies, Major Applications Team Leader
Stephanie Wade, Senior Planning Officer 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Mark Irvine and
Andrew Kain. 
2. DECLARATIONS OF INTEREST 
Councillor Blair declared a non-financial interest in planning application reference
22/02479/PP as his daughter worked with a company involved in the erection of pylon
lines.  Having taken note of the updated Standards Commission Guidance in relation to
declarations (issued on 7 December 2021) with specific reference to section 5.4(c), he did
not consider that he had a relevant connection and as such would remain in the meeting
and take part in the consideration of this application which is dealt with at item 5 of this
Minute. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 19
April 2023 at 10.30 am was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 19
April 2023 at 2.00 pm was approved as a correct record. 
4. MOWI SCOTLAND LTD: FORMATION OF FISH FARM (ATLANTIC SALMON)
INCORPORATING TWELVE 120M CIRCUMFERENCE CIRCULAR CAGES AND
SITING OF FEED BARGE: NORTH KILBRANNAN FISH FARM, NORTH OF
COUR BAY, KILBRANNAN SOUND, EAST KINTYRE (REF: 20/01345/MFF) 
The Major Applications Team Leader spoke to the terms of the report and to
supplementary reports numbered 1 and 2 which advised of late representations, a
representation of support that had been withdrawn and further comment from Nature Scot
and the Applicant.   
This application is for the siting and operation of a new salmon fish farm located within the
Kilbrannan Sound.  The site would be served by sea from the existing shore base at

Page 2

Carradale Harbour.  At the time of writing the report this application has attracted 232
objections, 2 representations and 45 expressions of support.  Objections have also been
raised by Argyll District Salmon Fishery Board, Tarbert and Skipness Community Council,
Fisheries Management Scotland, and the Clyde Fishermen’s Association.   
The proposal is considered to be consistent with the relevant provisions of the
Development Plan.  However, given the level of interest in the application and the
complexity of the issues raised, it was recommended that a discretionary pre-
determination hearing be held for this application in advance of determining this
application. 
Decision 
The Committee agreed: 
1. to hold a discretionary pre determination hearing at the earliest opportunity on a hybrid
basis within the Council Chamber, Kilmory, Lochgilphead and by Microsoft Teams; and 
2. to hold a site visit in advance of the date of the hearing. 
(Reference: Report by Head of Development and Economic Growth dated 12 May 2023
and supplementary reports 1 and 2 dated 23 May 2023, submitted) 
5. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: ERECTION OF HIGH
VOLTAGE ELECTRICITY SUBSTATION AND FORMATION OF ASSOCIATED
ACCESS, LANDSCAPING, DRAINAGE AND MEANS OF ENCLOSURE:
APPROXIMATELY 4KM SOUTH WEST OF INVERARAY, 300M WEST OF
DOUGLAS WATER AND UPSLOPE OF THE EXISTING AN SUIDHE
SUBSTATION, INVERARAY (REF: 22/02479/PP) 
The Senior Planning Officer spoke to the terms of the report.  The proposal is for the
erection of a 275kV gas insulated switchgear substation to connect into the recently
completed overhead line between Inveraray and Crossaig.  The proposal is part of a
number of infrastructure proposals to “maintain an efficient, co-ordinate and economical
electrical transmission system” and is required to allow connection for renewable energy
generation in the area across the wider electricity network. 
It is considered that the proposal would accord with the principles and policies contained
within the Local Development Plan and National Planning Framework 4 and is acceptable
in terms of all other applicable in full with the material considerations. 
It was recommended that planning permission be approved subject to conditions detailed
in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
1. The development shall be implemented in accordance with the details specified on the
application form dated 16th December 2022; the Environmental Appraisal (November
2022), supporting information and, the approved drawings listed in the table below
unless the prior written approval of the planning authority is obtained for an

Page 3

amendment to the approved details under Section 64 of the Town and Country
Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date
Received
Site Location
Plan
A01 A01 13/01/2023
Figure 1.1 An
Suidhe
Substation
Red Line
Boundary
A01 A01 13/01/2023
Site Layout
Plan
4534a-DR-P-0017 Rev.2 19/12/2022
Substation
Compound
Layout and
Electrical
Section
Locations
4534a-DR-P-0004 Rev.3 13/01/2023
Proposed Site
Access
Profiles
4534a-DR-P-0021  07/12/2022
Proposed Site
Profiles
4534a-DR-P-0018 Rev.1 07/12/2022
Site Access
Details
4534a-DR-P-0008 Rev.1 07/12/2022
Typical Access
Track Sections
– Sheet 1
4534a-DR-P-0007 Rev.2 07/12/2022
Typical Access
Track Sections
– Sheet 2
4534a-DR-P-0012 Rev.2 07/12/2022
Typical Deer
Fence and
Gate
4534a-DR-P-0016  07/12/2022
2.5m High
Security
Palisade
Fencing
Details
CE/34/2015 Rev.E 19/12/2022
Electrical
Layout
Elevations 01
4534a-DR-P-0011 Rev.1 07/12/2022
Electrical
layout
Elevations 02
4534a-DR_P-0013 Rev.2 07/12/2022
Generator
Building
Elevations
4534a-DR-P-0009 Rev.2 07/12/2022
Generator
Building Floor
LT288 An
SUIDHE_DIESEL_FLOOR
Rev.1 13/01/2023

Page 4

Plan
Substation
Building
Elevations
4534a-DR-P-0006 Rev.2 07/12/2022
Substation
Building
Layout
4534a-DR-P-0005 Rev.1 07/12/2022
Transformer
Building
Elevations
4534a-DR-P-0019  07/12/2022
Transformer
Building
Layout
4534a-DR-P-0020  07/12/2022
An Suidhe
Septic Tank
and Private
Water Supply
Location 
A01 13/01/2023 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. No construction works shall be commenced until a Finalised Construction
Environmental Management Document [CEMD] has been submitted to and approved
in writing by the Planning Authority, in consultation with SEPA and other consultees, as
appropriate. The development shall then proceed in accordance with the approved
CEMD unless otherwise agreed in writing by the Planning Authority. The CEMD shall
include: 
a) An updated Schedule of Mitigation (SM) highlighting mitigation set out within each
chapter of the Environmental Appraisal (EA), and the conditions of this consent;
b) Processes to control/ action changes from the agreed SM;
c) Construction Environmental Management Plans (CEMPs) for the construction
phase covering: 
i) Habitat and species protection, including ECoW Details, surveys and
species protection plans;
ii) Landscape and Mitigation Restoration Plan including compensatory planting
(refer to Condition 9);
iii) Pollution prevention and control;
iv) Dust management, including construction activity and vehicle movements;
v) Construction noise and vibration
vi) Temporary site lighting;
vii) Watercourse crossings;
viii) Site waste management
ix) Surface and ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of
high flow or high rainfall; and a programme of water quality monitoring;
x) Soil Management and Peat Management Plan 
xi) Mapping of borrow pits and associated habitats identified for restoration;
xii) Invasive Non-Native Species Management Plan

Page 5

xiii) Emergency Response Plans;
xiv) Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and 
xv) Other relevant environmental management as may be relevant to the
development 
d) A statement of responsibility to ‘stop the job/ activity’ if a breach or potential breach
of mitigation or legislation occurs; and
e) Methods of monitoring, auditing, reporting and the communication of environmental
management on site and with client, Planning Authority, and other relevant parties. 
Reason: To ensure protection of surrounding environmental interests and general
amenity. 
3. No development shall commence until a Construction Traffic Management Plan
(CTMP) and Phased Delivery Plan have been prepared and approved in writing by the
Local Authority, in consultation with the Roads Authority, and Transport Scotland as
the trunk roads Authority. The Plan shall include details of: 
a) Approved access routes, 
b) Agreed operational practises (including avoidance of convoy movements,
specifying conduct in use of passing places, identification of turning areas,
information of wheel cleansing facilities, signage to be installed on the A83 warning
of construction traffic, signage or temporary traffic control measures to include for
larger or abnormal loads, reporting of verge damage); 
c) The provision of an appropriate Code of Practice to drivers of construction and
delivery vehicles. 
d) Abnormal load route surveys and finalised plan (including any accommodation
measures required including the removal of street furniture, junction widening,
traffic management). 
The development shall be implemented in accordance with the duly approved Traffic
Management Plan 
Reason: To minimise the interference with the safety and free flow of traffic on the
trunk road and to ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network. 
4. No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. The scheme shall be prepared by a suitably
qualified person and shall provide for the recording, recovery and reporting of items of
interest or finds within the application site. Thereafter the development shall be
implemented in accordance with the duly approved details with the suitably qualified
person being afforded access at all reasonable times during ground disturbance works. 
Reason: In order to protect archaeological resources. 
5. No development shall commence, until a strategy for housing incoming construction
workers shall be submitted to and approved in writing by the Planning Authority.
Thereafter the development shall be carried out in accordance with the approved
details.

Page 6

Reason: In order to ensure that any potential adverse impacts on the functioning of the
local housing market and tourist accommodation to the detriment of the interests of the
local community are identified and mitigated in accordance with the requirements of
NPF4, and in particular Policy 11C and Policy 25 Objectives. 
6. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006
or Part 3 of the Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 (as appropriate) which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies. 
7. No development shall commence until detailed planning permission has been granted
for the watercourse diversion works located outwith the red line development boundary
of 22/02479/PP.   
Reason: To ensure that the watercourse diversion works located outwith the red line
development boundary for this application are considered in full and permitted by
separate planning application, in accordance with SEPA advice. 
8. No development shall commence until full details of the final drainage scheme and
watercourse diversion have been submitted to and approved in writing by the Planning
Authority, in consultation with the Council’s Flood Risk Advisors and SEPA. The
approved drainage and watercourse diversion scheme shall be implemented in full and
maintained in accordance with the approved details in full, prior to the first use of the
development. 
Reason: To ensure satisfactory arrangements for the disposal of surface water are
provided and to ensure the watercourse diversion is acceptable. 
9. No development shall commence, until a revised Landscape Planting Plan and
Maintenance Plan in accordance with BS EN ISO 11091:1999 has been submitted to
and approved in writing by the Planning Authority. The revised plans must include: 
a) A plan showing numbers and locations of each tree and shrub species;

Page 7

b) Planting schedule to show for each species, the total number, type and size at
planting;
c) Specification for planting to include ground preparation, planting operations and
protection from herbivores;
d) Compensatory planting scheme for tree loss
e) Schedule of implementation and phasing; 
The approved Landscape Planting Plan and Maintenance Plan shall thereafter be
implemented in full in accordance with the implementation schedule and maintained in
accordance with the approved details. Any plant losses within the first five years will be
replaced at the next planting season. 
Reason: To ensure the development conserves and enhances the landscape
character and biodiversity interests of the area. 
10. Watercourse crossings, hereby permitted, shall be designed to at least the capacity of
the existing channel and to the 1 in 200 year plus climate change flow and an
allowance for freeboard, unless otherwise agreed in writing by the Planning Authority.   
Reason: To ensure that new watercourse crossings do not affect the existing flows in
the interests of flood risk. 
11. No external lighting shall be installed on the site other than with the prior written
approval of the planning authority. In that event the location, type and luminance of the
lighting units to be installed shall be specified, and any duly approved lighting shall be
installed in a manner which minimises illumination and glare outwith the boundary of
the application site. The site shall not be illuminated other than in the event of staff
being present on site. 
Reason: In order to avoid unnecessary visual intrusion in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources. 
(Reference: Report by Head of Development and Economic Growth dated 9 May 2023,
submitted) 
6. CALA MANAGEMENT LIMITED: VARIATION OF CONDITION 2 RELATIVE TO
PLANNING PERMISSION IN PRINCIPLE REFERENCE 18/01444/PP (PP-130-
2071) - AMENDMENT TO WORDING OF CONDITION 2 IN RELATION TO
FINISHED FLOOR LEVELS: LAND NORTH OF CARDROSS PRIMARY
SCHOOL, BARRS ROAD, CARDROSS (REF: 23/00145/PP) 
The Senior Planning Officer spoke to the terms of the report.  This is a Section 42
application which is an application for a new planning permission for a development but
with different conditions from those attached to a previous permission for that
development.  In determining such an application, the planning authority can only consider
the changes to the conditions on the previous permission.  The principle of development is
not under consideration and the original permission remains live. 
Planning permission in principle was approved for this development following a hearing on
26 January 2017.  The site is located to the north of the settlement of Cardross and is
bounded by Darleith Road to the west and a private access to the east.  This private
access is a continuation of Barrs Road.   The applicant has applied to vary Condition 2 to
alter the finished floor levels of the dwellings.

Page 8

It is considered that the proposal accords with the principles and policies contained within
the Local Development Plan and it was recommended that planning permission be
granted subject to the conditions and reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission in accordance with Section 42 of the
Town and Country Planning (Scotland) Act 1997 subject to the following conditions and
reasons: 
1. Plans and particulars of the matters specified in conditions 2,3,6,7,8,9,11,12,13,15,16
and 17; below shall be submitted by way of application(s) for Approval of Matters
Specified in Conditions in accordance with the timescales and other limitations in
Section 59 of the Town and Country Planning (Scotland) Act 1997, as amended.
Thereafter the development shall be completed wholly in accordance with the details
contained within the approved plans and particulars.  
Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act
1997, as amended. 
2. Pursuant to Condition 1 – unless otherwise approved in writing by the Planning
Authority, no development shall commence in respect of any individual plot until plans
and particulars of the site layout, design and external finishes of the development have
been submitted to and approved by the Planning Authority. These details shall
incorporate proposed finished floor levels relative to an identifiable fixed datum located
outwith the application site. These levels shall be at least 0.15 metres above finished
ground levels. Thereafter, the development shall be implemented in accordance with
the duly approved details which shall have regard to special needs access
requirements established by policies SG LTP TRAN 3 and SG LDP HOU 2. 
Reason: To ensure that the development has a layout and design which is compatible
with its surroundings and in accordance with Local Development Plan policy. 
3. Pursuant to Condition 1 – no development shall commence until a scheme for the
provision of affordable housing that is in accordance with the provisions of the
Council’s Development Plan Policy and Supplementary Guidance on Affordable
Housing has been submitted to and approved in writing by the Planning Authority. The
scheme shall: 
a) Provide that a minimum of 25% of the approved dwellings are affordable homes;
b) Define those dwellings that are to be used as affordable homes;
c) Establish the timing of the provision of the affordable homes relative to the phasing
of the development, which shall ensure that works on the last 25% of those
approved dwellings that are not affordable homes are not commenced until the
affordable homes have been completed for occupation;
d) Establish the arrangements to ensure the affordability of the affordable homes for
both initial and subsequent occupiers. 
The development shall be implemented and occupied thereafter in accordance with
the duly approved scheme for affordable housing.

Page 9

Reason: To accord with the provisions of the development plan in respect of affordable
housing provision. 
4. Unless otherwise agreed in writing by the Planning Authority in consultation with the
Road Network Manager, no development shall commence unless and until the
following improvements to Darleith Road have been provided: 
i) The provision of a suitable traffic calming scheme (give and take priority) and the
provision of three new off-street car parking spaces between Barrs Terrace and Mill
Road. A drawing showing details of these provisions shall be submitted for prior
written approval of the Planning Authority.
ii) Road improvement between Mill Road and the proposed development site
entrance as identified on plan TIAvcar2_SK002B.
iii) The provision of a passing place immediately to the north of the proposed
development site entrance in order to accommodate large vehicles passing in
opposite directions.
iv) Upgrade of the existing lighting between Mill road and the existing 30 mph speed
restriction limit. 
Reason: To provide improvements, including suitable traffic calming measures,
compensatory parking and a passing place for larger vehicles, in the interests of road
safety and to ensure a safe connection from the A814 to the site. 
5. Unless otherwise agreed in writing by the Planning Authority, in consultation with the
Road Network Manager, no dwelling shall be occupied unless and until the existing 30
miles per hour speed restriction on Darleith Road has been extended and brought into
effect to a location north of the Darleith Road access, the exact location to be agreed
in consultation with the Road Network Manager. 
Reason: In the interests of road safety. 
6. Pursuant to Condition 1 – no development shall commence until the following plans
and particulars have been submitted to and approved by the Planning Authority in
consultation with the Road Network Manager. Thereafter, the schemes shall be carried
out in accordance with the approved details. Such details shall incorporate: 
i) On the A814 Main Road, Cardross, a scheme to enhance the gateway features in
both directions at the entrances into Cardross village to be fully implemented in
accordance with these details prior to occupation of the first dwelling house.
ii) On the A814 Main Road, Cardross, within the village envelope a scheme to
enhance traffic calming to be fully implemented in accordance with these details
prior to occupation of the first dwelling house. 
Reason: In the interests of road safety. 
7. Pursuant to Condition 1 – no development shall commence until full details of the
internal road layout within the development have been submitted to and approved in
writing by the Planning Authority. The development layout shall ensure that no more
than 20 dwelling houses will be served from the east access, i.e. via Barrs Road. All
other vehicular traffic will be required to access the development site from Darleith
Road. The internal roads shall be constructed in accordance with the principles of
Designing Streets.

Page 10

Reason: In the interests of road safety and good place making. 
8. Pursuant to Condition 1 – Car parking provision shall be provided in accordance with
the Argyll and Bute Council supplementary guidance policy SG LDP TRAN 6. Parking
provision shall be constructed and made available for use prior to the first occupation
to the dwelling(s) to which it relates and shall be maintained thereafter for the parking
of vehicles. 
Reason: In the interests of road safety. 
9. Pursuant to Condition 1 – no development or ground breaking works shall commence
until an archaeological field evaluation has been undertaken and submitted to the
Planning Authority for approval, the results of which shall inform as necessary the
layout of the development to be submitted for the purposes of the Approval of Matters
Subject to Conditions. 
This archaeological field evaluation shall be prepared by a suitably qualified person
and shall consist of a trial trenching programme of a distributed sample of 8% of the
full application area. The West of Scotland Archaeology Service shall be notified at
least 14 days in advance of the evaluation in order to facilitate monitoring of the work
evidence of which to be submitted along with the archaeological field evaluation as
part of the Approval of Matters Specified in Conditions submission. If archaeological
remains on the site are confirmed, proposals for their preservation shall also be
included. 
Reason: In order to protect archaeological resources. 
10. For the avoidance of doubt the proposals hereby approved shall be served by public
water and sewerage connections. 
Reason: The proposal has been assessed on this basis and the introduction of private
connections would represent a further material consideration in the determination of
this planning application. 
11. Pursuant to Condition 1 – no development shall commence until the following details
have been submitted to and approved in writing by the Planning Authority: 
i) Details of the proposed cut-off ditch (or similar) to be located along the northern
border of the site along with calculations demonstrating that this proposed
mitigation measure will not exacerbate flooding elsewhere;
ii) The existing flow pathway in the vicinity of the sewer line shall be maintained;
iii) A detailed drainage assessment and layout;
iv) Method Statement detailing surface water containment during construction. 
Reason: In order to ensure appropriate mitigation for flood risk. 
12. Pursuant to Condition 1 – full details of the proposed SUDs shall be submitted to and
approved in writing by the planning authority. Thereafter the development shall
commence in accordance with these details. These details shall include: 
i) Full details of the proposed design and appearance of the SUDs facility to be
designed in accordance with CIRIA C753;
ii) Detailed design calculations for this facility;

Page 11

iii) Details of the proposed drainage of the SUDs facility; 
iv) Details of the proposed maintenance regime and maintenance responsibilities for
the SUDs facility.
v) Soil information to be provided if infiltration SUDs are proposed. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
13. Pursuant to Condition 1 – no development shall until a scheme of boundary treatment,
surface treatment and landscaping has been submitted to and approved by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates. This shall
include details of a secure boundary between the application site and the disused
quarry on the south west corner of the site;
iv) Proposed soft and hard landscaping works including the location, species and size
of every tree/ shrub to be planted;
v) A programme for the timing, method of implementation, completion and subsequent
on-going maintenance.
vi) The proposed landscape plan shall take account of the Design Recommendations
(para.4.8) contained within the applicant’s supporting Landscaping Report dated
June 2015 undertaken by Ann Nevett. 
In addition, in accordance with the requirements of NPF4 Policy 3b, a Biodiversity
Statement shall be submitted which demonstrates how the proposal will conserve,
restore and enhance biodiversity including nature networks so that they are in a
demonstrably better state than without intervention.  This should include details of
future management and should be informed by best practice methods. 
Reason: To assist with the integration of the proposal with its surroundings in the
interests of amenity and to comply with Policy 3 of NPF 4. 
14. No trees overhanging the site shall be lopped, topped, or felled other than in
accordance with the details provided to satisfy the requirements of condition 13 above. 
Reason: In order to protect the trees overhanging the site in the interests of amenity. 
15. Pursuant to Condition 1 – no development shall commence until details for the
provision and maintenance of proposed areas of communal open space and equipped
play area(s) 
within the development have been submitted to and approved in writing by the
Planning Authority. The details shall comprise: 
i) A plan showing the location and extent of communal open space and equipped
play areas;
ii) Provision to satisfy the minimum standards set out in the Development Plan; 6sqm
of equipped play space and 12sqm of informal open space per dwelling unit;
iii) Specification of play equipment to be installed, including surface treatments and
any means of enclosure, designed in accordance with the provisions of BS5696
(Play Equipment Intended for Permanent Installation Outdoors);

Page 12

iv) Proposals for the timing of the implementation of the play area(s) in relation to the
phasing of development;
v) A maintenance schedule for communal open spaces and equipped play areas in
accordance with the provisions of BS5696 including details of on-going inspection,
recording and procedures for detailing with defects. The communal open space and
equipped play area(s) shall be provided in accordance with the duly approved
details and shall be retained and maintained to the specified standards thereafter. 
Reason: In order to secure prevision of communal open space and equipped play
areas within the development in accordance with the minimum standards set out in the
Development Plan. 
16. Pursuant to Condition 1 – no development shall commence until details for the
arrangements for the storage, separation and collection of waste from the site,
including provision for the safe pick-up by refuse collection vehicles, have been
submitted to and approved in writing by the Planning Authority. Thereafter the duly
approved provision shall be implemented prior to the first occupation of the dwellings
which it is intended to serve. 
Reason: In order to ensure that satisfactory arrangements have been made for dealing
with waste on the site in accordance with Policy SG LDP SERV 5 (b). 
17. Pursuant to Condition 1 – no development shall commence until a Site Waste
Management Plan has been submitted to and approved in writing by the Planning
Authority. The provisions of this plan shall be adhered to during the construction period
unless any subsequent variation thereof is agreed in writing by the Planning Authority. 
Reason: In order to ensure the minimisation of waste generated during construction in
accordance with policy SG LDP SERV 5 (b). 
(Reference: Report by Head of Development and Economic Growth dated 1 May 2023,
submitted) 
7. BRIEFING PAPER: SCOTTISH GOVERNMENT PROPOSALS REGARDING
NEW NATIONAL PARKS 
A report raising awareness of the Scottish Government proposal regarding the selection
and designation of a new National Park(s), with the nomination process proposed to be
initiated in the summer 2023, was before the Committee for consideration. 
Decision 
The Committee considered and noted: 
1. the role of National Parks; 
2. the Scottish Government process for selection and designation of a new National
Park(s); and 
3. some of the potential issues related to the designation of a National Park. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 18 April 2023, submitted)