Perth and Kinross Council 
Finance and Resources Committee 
5 February 2025 
Revenue Budget 2024/25 – Update No. 3 
Contact Officer: Scott Walker, Chief Finance Officer
(Report No. 25/24) 
1. Purpose 
1.1 This report provides an update on progress with the 2024/25 General Fund
Revenue Budget based upon the November 2024 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected under spend on the 2024/25 General Fund
Management Budget is £1.155 million (see Appendix 1).   
2. Recommendations 
The Committee is requested to: 
(i) note the contents of the report,
(ii) note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2,
(iii) note the projected outturn for Corporate Budgets set out in Section 6,
(iv) note the funding update provided in Section 7,
(v) note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 4,
(vi) approve the adjustments to the 2024/25 Management Revenue Budget
(vii) detailed in Sections 9, 10 & 11 and Appendices 1, 2, 4, 5, 6, and 7,
(viii) note the financial risks set out in Section 12 and Appendix 8. 
3. Structure 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 2024/25 Additional Funding
Section 10 2024/25 Virements
Section 11 2024/25 Movements in Reserves
Section 12 Financial Risks
Section 13 Conclusions

Page 2

4. Background 
4.1 This report updates the Committee on progress with the 2024/25 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the November 2024 ledger,
updated for any subsequent known material movements. 
4.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2024/25 Revenue Budget on 28
February 2024 (Report No. 24/63 refers).  In addition, adjustments approved
by the Finance & Resources Committee on 24 April, 18 September 2024 and
20 November 2024 (Report Nos. 24/130, 24/260 and 24/318 refer) are
reflected in Appendix 1 (Column 2). 
5. Revenue Monitoring – Service Budgets 
5.1 The total net projected under spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £1.111 million which represents
0.3% of total net Service expenditure.  Since the last update, this is a positive
movement of £2.040 million. 
5.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
5.3 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets. 
Education and Learning 
5.5 The projected outturn for Education and Learning excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
anticipated to be on target against budgets which represents a movement of
£1.164 million from the last update.  The individual elements contributing to
this movement are summarised in the following table with commentary on the
significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Education & Learning Core Under spend (23) (1.7) (18)
Nursery Sector Under spend (976) (4.0) (299)
Primary Sector Over spend 1,064 2.3 (264)
Secondary Sector Under spend (466) (9.1) (546)
Special Sector Over spend 7 - (11)
Home to School Transport Over spend 394 3.7 (26)
TOTAL On Target - - (1,164)

Page 3

5.6 In the Nursery Sector, there is an increase in the projected under spend of
£299,000 due to additional staff slippage and reduced demand for deferred
places. 
5.7 In the Primary Sector there is a reduction in the projected over spend of
£264,000 due to reduced expenditure on supply teachers, in part during the
strike days in October 2024. 
5.8 Within the Secondary Sector, there is a reduction in the projected over
spend of £546,000 due to a reduction in pupil rolls partially offset by increased
loan charges. 
5.9 In Home to School Transport there is a reduction in the projected over
spend of £26,000 following inclusion of savings from the strike days in
October 2024. 
5.10 The Devolved School Management Scheme is currently projected to under
spend by £200,000.  However, some schools are experiencing challenges in
delivering approved staff slippage targets and facing inflationary pressures
against budgets that have been reduced over previous years.  The budgets
for the Devolved School Management scheme are allocated by financial year
(April – March), whereas expenditure is incurred by academic year (August –
June). 
5.11 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.864 million.  It is anticipated that the projected
under spend on teacher and support costs will be carried forward to 2025/26
to meet commitments.  The budgets for the Pupil Equity Fund scheme are
allocated by financial year, whereas expenditure is incurred by academic
year. 
Children, Families and Justice 
5.12 The projected outturn for Children, Families and Justice is £387,000 or
1.4% less than budget which represents a movement of £387,000 from the
last update.  The individual elements contributing to this position are
summarised in the following table with narrative on the significant variances
below. 
Function Projected Outturn Movement 
£’000 % £’000
Children & Families Under spend (387) (1.7) (387)
Justice Service On target 0 - -
TOTAL Under spend (387) (1.4) (387) 
5.13 There is an increase in the projected under spend on foster, kinship and
adoption payments and additional income, partially offset by further pressures
on residential placements and not achieving budgeted slippage targets.

Page 4

Economy, Development and Planning 
5.14 The projected outturn for Economy, Development and Planning is currently
anticipated to be £30,000 or 0.2% less than budget which represents a
movement of £90,000 from the last update.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (175) (2.5) (75)
Business and Investment Over spend 105 14.6 35
Tourism, Culture and Place Over spend  150 1.4 -
Development Management and
Building Standards
Under spend (110) - (50)
TOTAL Under spend (30) (0.2) (90) 
5.15 Service Wide there is an increase in the projected under spend of £75,000
due to staff slippage in excess of budgeted levels. 
5.16 In Development Management and Building Standards there is an increase
in the projected under spend of £50,000 due to additional planning & building
warrant income. 
Environment and Infrastructure 
5.17 The projected outturn for Environment and Infrastructure is currently
anticipated to be £480,000 or 1.4% less than budget which represents a
movement of £50,000 from the last update.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (300) (1.7) (50)
Traffic & Network Under spend (50) (4.6) -
Waste Disposal Under spend (350) (4.1) -
Refuse Collection Over spend 100 2.2 100
Fleet Over spend 120 - -
TOTAL Under spend (480) (1.4) 50 
5.18 Service Wide there is an increase in the projected under spend of £50,000
due to staff slippage in excess of budgeted levels. 
5.19 Across Waste Disposal, there is an increase in the level of income from sale
of recyclates (£100,000) that is offset by additional costs relating to essential
depot and site works (£100,000). 
5.20 In Refuse Collection there is a projected over spend of £100,000 due to a
shortfall in commercial waste income partially offset by savings on fuel.

Page 5

Housing and Communities 
5.21 The projected outturn for Housing and Communities is currently anticipated
to be £185,000 or 0.9% less than budget which represents a movement of
£90,000 from the position last reported.  The individual elements contributing
to this movement are summarised in the following table with commentary on
the significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (210) (2.4) (60)
Housing General Fund Over spend 40 0.5 -
Bereavement Services Over spend 15 1.9 -
Public Transport Unit Under spend (30) (0.8) (30)
TOTAL Under spend (185) (0.9) (90) 
5.22 On a Service Wide basis, there is an increase in the projected under spend
of £60,000 due to updated staff cost projections, partially offset by an
increased bad debt provision. 
5.23 Within the Public Transport Unit, there is a net projected under spend of
£30,000 made up of additional income from departure charges partially offset
by additional costs in relation to tendered services. 
Property Services 
5.24 The projected outturn for Property Services is currently anticipated to be
£550,000 or 0.8% more than budget which represents a movement of
£99,000 from the position last reported.  The individual elements contributing
to this movement are summarised in the following table with commentary on
the significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide  Over spend 385 0.6 57
Energy Under spend (324) (3.8) (85)
Maintenance Over spend 150 3.2 0
Facilities Management Over spend 339 5.5 99
Catering On target - 0 (170)
TOTAL Over spend 550 0.8 (99) 
5.25 On a Service Wide basis, there is a net increase in the projected over spend
of £57,000 following an update on staff and other costs alongside income
projections. 
5.26 On Energy, there is an increase in the projected under spend of £85,000 due
to updated rates and consumption information. 
5.27 In Facilities Management, there is an increase in the projected over spend of
£99,000 due to delays in implementing the new cleaning regime.

Page 6

5.28 In Catering, there is a reduction in the projected over spend of £170,000 due
to a fall in the uptake of school meals. 
Legal and Governance 
5.29 Within Legal and Governance there is a projected under spend of £9,000 or
0.2% which represents a movement of £87,000.  This movement is the result
of updated staff and other cost projections alongside income assumptions. 
Customer and Digital 
5.30 The projected outturn for Customer and Digital is currently anticipated to be
£119,000 or 1% more than budget which represents an increase of £30,000
from the last update.  The individual elements contributing to this movement
are summarised in the following table with commentary on the significant
movements below. 
Function Projected Outturn Movement 
£’000 % £’000
IT Over spend 69 1.2 0
Revenues & Benefits Over spend 50 0.8 30
TOTAL Over spend 119 1.0 30 
5.31 In Revenues and Benefits there is a net increase in the projected over spend
of £30,000 due to updated projections on staff and other costs. 
Strategic Planning and Performance 
5.32 Within Strategic Planning and Performance, there is a projected under
spend of £202,000 or 3.3% which represents an increase of £140,000 due to
the accelerated delivery of approved savings. 
Finance and Business Support 
5.33 The projected outturn for Finance and Business Support is currently
anticipated to be £507,000 or 5.7% less than budget which represents an
increase of £63,000 since the last update.  The individual elements
contributing to this movement are summarised in the following table with
commentary on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Finance Under spend (31) 0.0 (35)
Business Support Under spend (476) (12.5) (28)
TOTAL Under spend (507) (5.7) (63) 
5.34 Across both functions there are increases in the projected under spends,
primarily on staff costs due to the accelerated delivery of approved savings.

Page 7

6. Revenue Monitoring – Corporate Budgets 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Health & Social care 
6.2 On 11 December 2024, Perth and Kinross Integration Joint Board received a
report on the 2024/25 Financial Position (Report No. G/24/212 refers).  After
the application of earmarked Reserves and non-recurring funding, this report
presented a projected over spend of £1.243 million.  This position is
consistent with many other integration joint boards who also face significant
financial challenges in the current financial year.  Further information on this
position is set out in Appendix 3. 
6.3 Of the projected over spend set out above, £189,000 related to Social Care
and £1.054 million related to Health activity.  Under the terms of the
Integration Scheme, the Council is only exposed to the projected over spend
in relation to Social Care. 
6.4 The Integration Joint Board will be presented with a further update at its
meeting on 19 March 2025. 
Council Tax Reduction Scheme 
6.5 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.6 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements. 
6.7 In the current financial year, the Council is supporting approximately 8,600
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.91 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £150,000
which is reflected in Appendix 1. 
7. Revenue Monitoring – Funding 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll.

Page 8

7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 December 2024
together with prior year comparative figures for the previous five financial
years. 
7.4 Between 2019/20 and 2023/24, the average collection figure to 31 December
was 81.61%.  The actual collection figure to 31 December 2024 was 81.17%
which is 0.44% less than the five-year average and 0.32% less than the
comparable position in 2023. 
7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions.

Page 9

7.6 Given the 2024/25 collection information set out above and the growth in the
number of Band D equivalent properties, it is currently anticipated that Council
Tax income will exceed the budget by £250,000 in the current financial year
which is reflected in Appendix 1. 
Non-Domestic Rates 
7.7 The actual collection rate to 31 December 2024 was 81.38%, compared to
79.98% for the same period in 2023/24. 
8. Revenue Monitoring – Other Updates 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 Currently, for the current financial year, Live Active Leisure and Perth Theatre
and Concert Hall are projecting deficits that are in line with their approved
budgets. 
8.3 Culture Perth and Kinross are currently projecting a deficit for 2024/25 that is
significantly more than the level originally budgeted.  They have experienced
additional costs relating to the current year pay award, to historic equal pay
claims and to the running costs of their establishments, particularly Perth
Museum.

Page 10

8.4 Should these projections come to bear, Culture Perth and Kinross will have
negative unrestricted reserves as at 31 March 2025. 
8.5 Council officers will continue to work with Culture Perth and Kinross to provide
support and challenge but ultimately there may be a requirement to provide
additional funding in the current year. 
8.6 The Council previously agreed to underwrite costs of up to £170,000 in
relation to the opening of the Museum, particularly the café located within the
facility.  This support has not been required to date, and the budget is
currently sitting within Economy, Development and Planning. 
8.7 Approval is sought to delegate responsibility for providing this additional
financial support to the Chief Finance Officer.  Any payment will only be made
if absolutely required in order to ensure the financial position of Culture Perth
and Kinross at 31 March 2025. 
8.8 The long-term sustainability of the Council’s ALEOs across future financial
years remains challenging.  The Council’s Transformation and Change
Programme includes a review of ALEOs, and the Council will be asked to
consider options on future models of service delivery later this year. 
Tayside Contracts 
8.9 The operating environment for Tayside Contracts remains challenging.  They
continue to experience significant inflationary pressures on the price of staple
foods – beyond that of the headline CPI and RPI rates quote more widely. 
8.10 Tayside Contracts continue to identify mitigating actions, and the three
constituent Councils are looking at how they may assist.  Work continues
between officers of the Council and Tayside Contracts to further refine these
projections. 
8.11 Given the financial challenges facing Tayside Contracts, there is a risk that
the budgeted amount from the Trading Operations surplus of £550,000 will
not be received in the current year. 
Housing Revenue Account 
8.12 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 5. 
8.13 Across the Housing Revenue Account activity there is a net reduction in the
projected under spend of £23,000.  Within this movement, additional rental
income and a reduction in the bad debt provision is partially offset by
additional expenditure on repairs, insurance and Council Tax. 
8.14 As a result of the variances identified above Capital from Current Revenue will
reduce by £23,000.

Page 11

9. 2024/25 Additional Funding 
9.1 Since elected members were provided with the 2024/25 Revenue Budget
update on 20 November 2024 (Report No. 24/318 refers), notification has
been received of additional resources in the current financial year from
several sources as set out below.  To ensure that the 2024/25 Management
Budget continues to reflect the operational requirements of the Council,
several adjustments are required, which are summarised below and included
in Appendix 1 and Appendix 6. 
Scottish Government – Revenue Support Grant: 
• Maintain Teacher Numbers: £3.625 million (Education and Learning) 
• Teacher Induction Scheme: £106,000 (Education and Learning) 
• Teachers’ Superannuation: £2.258 million (Education and Learning) 
• SNCT Pay Offer: £760,000 (Education and Learning) 
• Ukraine Funding: £129,000 (Housing and Communities) 
• Scottish Welfare Fund: £368,000 (Customer and Digital Services)  
• Net other movements: reduction of £62,000 (Reserves)
Scottish Government – Ring Fenced Grant 
• Pupil Equity Fund: reduction of £10,000 (Education and Learning) 
9.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £7.184 million and reduction in Ring Fenced Grant
of £10,000 will be made through a redetermination of the Council’s funding.  It
is therefore necessary to adjust budgets for Education and Learning, Housing
and Communities, Customer and Digital Services, Reserves and Revenue
Support Grant. 
9.3 Action: The Council is asked to approve the adjustments set out at
paragraphs 9.1 and 9.2 which are reflected in Appendix 1 (Column 3) to this
report. 
Other Funding 
9.4 Other funding amounting to £1.885 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.  Details of this funding is set out in
Appendix 5. 
9.5 Action: The Committee is asked to note the receipt of £1.885 million of
additional resources, with this funding being reflected within Education and
Learning, Children, Families and Justice, Economy, Development and
Planning, Environment and Infrastructure and Housing and Communities as
additional grant income.  The current projected outturn assumes that all these
additional resources will be fully expended in 2024/25 or will be carried
forward under the terms of the grant award.

Page 12

10. 2024/25 Virements 
Contribution to/from Capital Fund 
10.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund. 
10.2 The latest monitoring indicates a projected increase in capital financing costs
(loan charges) of £16,000 based on the latest treasury management activity
and a reduction of £209,000 in income from interest on revenue balances due
to reduced cashflows.  This will result in a reduced Contribution to the Capital
Fund of £225,000 in the current financial year. 
10.3 Action: The Committee is requested to approve the virement of £16,000 to
the Capital Financing Costs (Loan Charges) Budget and £209,000 to Interest
on Revenue Balances with a corresponding reduction in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 5) to this report. 
Service Virements 
10.4 To ensure that the 2024/25 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 5) that have been
processed in line with the Scheme of Administration. 
10.5 These adjustments include allocations of pay award funding, including support
to ALEOs, Tayside Contracts and the Health and Social Care Partnership,
and adjustments between Strategic Leads to ensure budgets are aligned with
responsibility. 
11. 2024/25 Movements in Reserves 
11.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2024 (per
unaudited Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2024/25. 2025/26 and 2026/27.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves.
11.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied.

Page 13

ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
11.3 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration. 
Balances Held Under Statute / Regulation 
11.4 Approval is sought to draw down resources of £820,000 from the Council Tax
Income for Affordable Housing earmarked Reserve.  Funding of £120,000
will support the new house building at Weavers Gait, Kinross and £700,000
will contribute to the acquisitions of properties in Dunkeld. 
11.5 Action: The Committee is asked to approve the transfer of £820,000 from the
Council Tax Income for Affordable Housing earmarked Reserve to Housing &
Communities.  This adjustment is reflected in Appendix 1 (Column 5) to the
report. 
Balances Held for Specific (Previously Approved) Purposes 
11.6 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
11.7 Specifically, authority is sought to transfer: 
• £540,000 from Services to the Transformation and Workforce
Management earmarked Reserve in line with actual spending profiles.
• £370,000 from Customer and Digital to the Anti-Poverty earmarked
Reserve following the receipt of additional funding from the Scottish
Government.
• £175,000 to Housing and Communities from the Community Resilience
earmarked Reserve to fund projects and initiatives across Perth and
Kinross.
• £20,000 to Housing and Communities from the Community Investment
Fund earmarked Reserve to support approved applications.
• £420,000 to Housing and Communities from the Car Park earmarked
Reserve for Rural Electric Vehicle Charging Points and Ticket issuing
machines.
11.8 Action: The Committee is asked to approve the transfer to / from earmarked
Reserves set out in paragraph 11.7 above.  These adjustments are reflected
in Appendix 1 (Column 5) to the report.

Page 14

11.9 In addition, in setting the 2024/25 Revenue Budget in February 2024, the
Council approved expenditure to fund several specific initiatives.  For a variety
of reasons including consultation, capacity and timing issues, there has been
slippage in the delivery of a few of these projects that may result in the
expenditure not being incurred in the current financial year.  Projects totalling
£555,000 are set out at Appendix 7. 
11.10 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 7 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery.
The final outturn for individual projects may change before the end of the
financial year, therefore, by agreeing the projects within Appendix 7, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves. 
11.11 Should any of the projects no longer be a priority, the projected under spend
would be available to support the financial management of the Council in both
current and future financial years. 
11.12 Action: The Committee is asked to confirm that the projects listed in
Appendix 7 remain a priority and that the final under spends, currently
projected at £555,000 are transferred to an earmarked Reserve to ensure
delivery.  These adjustments are reflected in Appendix 1 (Column 5) to the
report. 
11.13 In November 2024, the events planned for the weekend of the Christmas
lights switch on were cancelled due to inclement weather.  This is now subject
to an ongoing insurance claim so that the Council recovers the costs that had
been incurred.  Should this claim be successful, and the refund is received
prior to 31 March 2025, approval is sought to create an earmarked Reserve
for events so that the funding is available to augment activity in future years. 
11.14 Action: Subject to a successful insurance claim by 31 March 2025, approval
is sought to transfer the receipt to an earmarked Reserve to support events in
future financial years. 
Unearmarked Reserves – Savings from Strikes 
11.15 During October 2024, industrial action in the form of strikes took place in
schools across Perth and Kinross.  This resulted in direct staff savings of
£883,000 which will be removed from Education and Learning and applied to
unearmarked Reserves.  This adjustment is included in Appendix 1 and
included in Appendix 6. 
11.16 Action: The Committee is asked to approve the transfer of £883,000 which is
the saving on the strikes that took place in October 2024 from Education and
Learning to unearmarked Reserves.  This adjustment is reflected in Appendix
1 (Column 5) to the report.

Page 15

12. Financial Risks 
12.1 In preparing the Council's 2024/25 revenue monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
12.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
12.3 Risks are captured within the body of the report with a summary being
maintained in Appendix 8. 
12.4 Two risks have been removed for the current year with confirmation of funding
for the following: 
• Current Year Pay Awards
• Funding
o Pupil Teacher Ratio
o Teachers Superannuation Costs
13. Conclusion 
13.1 Based on the November 2024 ledger, a projected under spend of £1.155
million has been identified in the current financial year. 
13.2 This level of projected under spend, along with the transfer included at
paragraph 11.15 will result in an increase in the level of unearmarked
Reserves to £17.979 million or 3.8% (see Appendix 6). 
13.3 The financial position of the Council and its partners including the Health &
Social Care Partnership and the ALEOs remains challenging and regular
updates will be provided to the Council and the Finance and Resources
Committee as the position develops. 
APPROVED 
Name  Designation Date
Scott Walker Chief Finance Officer 21 January 2025

Page 16

ANNEX 
1. Implications, Assessments, Consultation and Communication 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.

Page 17

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.

Page 18

4. Consultation 
Internal 
4.1 The Strategic Leadership Team have been consulted in the preparation of this
report. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix 1 – 2024/25 Management Budget
Appendix 2 – General Fund 2024/25 Projected Outturn – Service Analysis
Appendix 3 – Perth & Kinross IJB 2024/25 outturn
Appendix 4 – Housing Revenue Account 2024/25 Projected Outturn
Appendix 5 – Other Fundings
Appendix 6 – General Fund Balances
Appendix 7 – Council Approved Revenue Budget Flexibility 2024/25
Appendix 8 – Financial Risks