PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
20 NOVEMBER 2024 
REVENUE BUDGET 2024/25 – UPDATE NO. 2 
Contact Officer: Scott Walker, Chief Finance Officer
(Report No. 24/318) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2024/25 General Fund
Revenue Budget based upon the August 2024 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected over spend on the 2024/25 General Fund Management
Budget is £885,000 (£1.598 million at this time in 2023/24) (see Appendix 1).   
2. RECOMMENDATIONS 
The Committee is requested to: 
A. note the contents of the report,
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2,
C. note the projected outturn for Corporate Budgets set out in Section 6,
D. note the funding update provided in Section 7,
E. note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 4,
F. approve the adjustments to the 2024/25 Management Revenue Budget
detailed in Sections 9, 10 & 11 and Appendices 1, 2, 4, 5, 6, and 7,
G. note the financial risks set out in Section 12 and Appendix 8. 
3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 2024/25 Additional Funding
Section 10 2024/25 Virements
Section 11 2024/25 Movements in Reserves
Section 12 Financial Risks
Section 13 Conclusions

Page 2

4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2024/25 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the August 2024 ledger,
updated for any subsequent known material movements. 
4.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2024/25 Revenue Budget on
28 February 2024 (Report No. 24/63 refers).  In addition, adjustments
approved by the Finance & Resources Committee on 24 April and
18 September 2024 (Report Nos. 24/130 and 24/260 refer) are reflected in
Appendix 1 (Column 2). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 The total net projected over spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £929,000 which represents 0.3%
of total net Service expenditure.  This is a reduction of £473,000 from the last
update. 
5.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
5.3 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets. 
2024/25 Pay Awards 
5.5 The full financial implications of the 2024/25 pay awards for all staff groups
have not been included within this latest update.  The pay award for teaching
staff has been agreed and it is anticipated that this will be paid at the end of
November.  The pay award for non-teaching staff has not been agreed, but
similarly will be paid at the end of November. 
5.6 The financial implications of these pay awards will be included in the next
update to the Committee.   
5.7 There will also be financial implications for Tayside Contracts which will flow
through to the constituent Councils in the form of increased charges. 
Education & Learning 
5.8 The projected outturn for Education & Learning excluding Devolved School
Management (DSM) and the Pupil Equity Fund (PEF) is currently anticipated

Page 3

to be £1.164 million or 0.7% more than budget which represents a movement
of £291,000 from the last update.  The individual elements contributing to this
movement are summarised in the following table with commentary on the
significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Education & Learning Core Under spend (5) (0.4) 0
Nursery Sector Under spend (677) (2.82) 0
Primary Sector Over spend 1,328 2.89 (156)
Secondary Sector Over spend 80 2.1 0
Special Sector Over spend 18 0.09 27
Home to School Transport Over spend 420 3.93 420
TOTAL Over spend 1,164 0.70 291 
5.9 In the Primary Sector there is a reduction in the projected over spend of
£156,000 following an update in staff cost projections. 
5.10 In Home to School Transport there is an increase in the projected over
spend of £420,000 based on the latest forecasts on both demand and price. 
5.11 The Devolved School Management Scheme is currently projected to be on
target.  However, schools are experiencing challenges in delivering approved
staff slippage targets and facing inflationary pressures against budgets that
have been reduced over previous years.  The budgets for the Devolved
School Management scheme are allocated by financial year (April – March),
whereas expenditure is incurred by academic year (August – June). 
5.12 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2025.  It is anticipated that the projected under
spend on teacher and support costs will be carried forward to 2025/26 to meet
commitments.  The budgets for the Pupil Equity Fund scheme are allocated
by financial year, whereas expenditure is incurred by academic year. 
Children, Families & Justice 
5.13 The projected outturn for Children, Families & Justice is still currently
anticipated to be on target against budget.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Children & Families On target 0 - n/a
Justice Service On target 0 - n/a
TOTAL On Target - - n/a

Page 4

5.14 Despite Children & Families projections still being on target against budget,
there are still pressures on residential placements which are being offset by
foster, kinship and adoption payments. 
Economy, Development & Planning 
5.15 The projected outturn for Economy, Development & Planning is currently
anticipated to be £60,000 more than budget.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (100) (1.3) (100)
Business & Investment Over spend 70 7.4 70
Tourism, Culture & Place Over spend  150 1.4 150
Development Management &
Building Standards
Under spend (60) - (60)
TOTAL Over spend 60 0.3 60 
5.16 Service Wide there is a projected under spend of £100,000 due to staff
slippage in excess of budgeted levels. 
5.17 In Business & Investment there is a projected over spend of £70,000 for the
operating costs of Perth Harbour. 
5.18 In Tourism, Culture & Place there is a projected over spend of £150,000 in
relation to the delivery of previously approved savings from the review of
ALEOs. 
5.19 In Development Management & Building Standards there is a net
projected under spend of £60,000 due to additional planning & building
warrant income partially offset by legal costs relating to planning appeals. 
Environment & Infrastructure 
5.20 The projected outturn for Environment & Infrastructure is currently
anticipated to be £530,000 less than budget.  The individual elements
contributing to this position are summarised in the following table with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (250) (1.2) (250)
Traffic & Network Under spend (50) (4.6) (50)
Waste Disposal Under spend (350) (4.1) (350)
Fleet Over spend 120 - 120
TOTAL Under spend (530) (1.5) (530) 
5.21 Service Wide there is a projected under spend of £250,000 due to staff
slippage in excess of budgeted levels.

Page 5

5.22 In Traffic & Network there is a projected under spend of £50,000 due to
additional income from statutory road network works. 
5.23 In Waste Disposal there is a projected under spend of £350,000 due to
savings on the waste disposal contract and additional income from sale of
recyclates, both as a result of the new twin streaming collection service. 
5.24 In Fleet there is a net projected over spend of £120,000 due to the additional
costs of vehicle materials and repairs. 
Housing & Communities 
5.25 The projected outturn for Housing & Communities is currently anticipated to
be £95,000 or 0.1% less than budget which represents a movement of
£85,000 from the position last reported.  The individual elements contributing
to this movement are summarised in the following table with commentary on
the significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (150) (1.6) (75)
Housing General Fund Over spend 40 0.5 (10)
Bereavement Services Over spend 15 1.9 0
TOTAL Under spend (95) (0.5) (85) 
5.26 On a Service Wide basis, there is an increase in the projected under spend
of £75,000 due to updated staff cost projections. 
Property Services 
5.27 The projected outturn for Property Services is currently anticipated to be
£649,000 or 1.0% more than budget which represents a movement of
£37,000 from the position last reported.  The individual elements contributing
to this movement are summarised in the following table with commentary on
the significant movements below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide  Over spend 328 0.5 (98)
Energy Under spend (239) (2.8) 61
Maintenance Over spend 150 3.2 n/a
Facilities Management Over spend 240 3.9 n/a
Catering Over spend 170 2.4 n/a
TOTAL Over spend 649 1.0% (37) 
5.28 On a Service Wide basis, there is a reduction in the projected over spend of
£98,000 following an update on staff cost and income projections. 
5.29 On Energy, there is a reduction in the projected under spend of £61,000 due
to updated rates and consumption information.

Page 6

Legal & Governance 
5.30 Within Legal & Governance there is a projected over spend of £78,000 or
1.7% which represents a movement of £38,000.  This movement is the result
of updated staff cost and income assumptions. 
Customer & Digital 
5.31 The projected outturn for Customer & Digital is currently anticipated to be
£89,000 or 0.8% more than budget which represents a reduction of £98,000
from the last update.  The individual elements contributing to this movement
are summarised in the following table with commentary on the significant
movements below. 
Function Projected Outturn Movement 
£’000 % £’000
IT Over spend 69 1.2 69
Revenues & Benefits Over spend 20 0.3 (167)
TOTAL Over spend 89 0.8% (98) 
5.32 In IT there is an increase in the projected over spend of £69,000 on staff costs
as the slippage target is not currently being met. 
5.33 In Revenues & Benefits there is a reduction in the projected over spend of
£167,000 due to under spends on staff costs and additional income partially
offset by an additional expenditure on social housing providers. 
Strategic Planning & Performance 
5.34 Within Strategic Planning & Performance, there is a projected under spend
of £62,000 or 0.9% which represents an increase of £18,000. 
Finance & Business Support 
5.35 The projected outturn for Finance & Business Support is currently
anticipated to be £444,000 or 5.1% less than budget which represents an
increase of £94,000 since the last update.  The individual elements
contributing to this movement are summarised in the following table with
commentary on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Finance Over spend 4 0.0 (13)
Business Support Under spend (448) (11.5) (81)
TOTAL Under spend (444) (5.1) (94) 
5.36 Across Business Support, there is an increase in the projected under spend
of £81,000 primarily on staff costs due to the accelerated delivery of approved
savings.

Page 7

6. REVENUE MONITORING – CORPORATE BUDGETS 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Health & Social care 
6.2 On 23 September 2024, the Audit & Performance Committee of the Perth &
Kinross Integration Joint Board (IJB) received a report on the 2024/25
Financial Position (Report No. G/24/147 refers).  After the application of
earmarked Reserves and non-recurring funding, this report presented a
projected over spend of £1.637 million.  This position is consistent with many
other integration joint boards who also face significant financial challenges in
the current financial year. 
6.3 On 2 October 2024, Perth & Kinross Integration Joint Board approved a
Financial Recovery Plan which aimed to reduce expenditure for the remainder
of 2024/25 (Report No. G/24/163 refers).  The measures approved, totalling
£1.3 million, included vacancy management, further cost control and the
application of additional earmarked Reserves.  It is projected that these
measures will reduce the projected over spend to £337,000, This remaining
expenditure is being incurred against health services as shown in Appendix
3. 
6.4 The Integration Joint Board will be presented with a further update at its
meeting on 11 December 2024. 
Council Tax Reduction Scheme 
6.5 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.6 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements. 
6.7 In the current financial year, the Council is supporting approximately 8,600
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.91 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £150,000
which is reflected in Appendix 1. 
7. REVENUE MONITORING – FUNDING 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below.

Page 8

Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 October 2024 together
with prior year comparative figures for the previous five financial years. 
7.4 Between 2019/20 and 2023/24, the average collection figure to 31 October
was 63.79%.  The actual collection figure to 30 September 2024 was 63.54%
which is 0.25% less than the five-year average and the comparable position in
2023.

Page 9

7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
7.6 Given the 2024/25 collection information set out above and the growth in the
number of Band D equivalent properties, it is currently anticipated that Council
Tax income will exceed the budget by £250,000 in the current financial year
which is reflected in Appendix 1. 
Non-Domestic Rates 
7.7 The actual collection rate to 31 October 2024 was 67.43%, compared to
51.83% for the same period in 2023/24. 
8. REVENUE MONITORING – OTHER UPDATES 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 Currently, for the current financial year, all three ALEOs are projecting a
deficit that is in line with their approved budgets. 
8.3 The long-term sustainability of the Council’s ALEOs across future financial
years will be kept under review with updates provided to future meetings of
the Finance & Resources Committee.

Page 10

Tayside Contracts 
8.4 The operating environment for Tayside Contracts remains challenging.  They
continue to experience significant inflationary pressures on the price of staple
foods – beyond that of the headline CPI and RPI rates quote more widely. 
8.5 Beyond that, negotiations on the 2024/25 pay award are still ongoing.  Should
the outcome of the negotiations exceed budgeted levels, without sufficient
external funding forthcoming, there is a risk that this will cause a further
significant risk to the profitability of Tayside Contracts. 
8.6 Tayside Contracts continue to identify mitigating actions and the three
constituent Councils are looking at how they may assist.  Work continues
between officers of the Council and Tayside Contracts to further refine these
projections. 
8.7 Both of these pressures may impact on the Council in the form of a request
for additional financial support, as has been the case in previous financial
years and / or the non-achievement of the budgeted income from the share of
Tayside Contract’s surplus. 
8.8 At this stage, the potential costs of providing additional financial support have
not been factored into the Council’s projections.  Any proposal to provide
additional funding to Tayside Contracts will be brought back to a future
meeting of the Finance & Resource Committee for approval by elected
members. 
8.9 In addition, given the financial challenges facing Tayside Contracts, there is a
risk that the budgeted amount from the Trading Operations surplus of
£550,000 will not be received in the current year. 
Housing Revenue Account 
8.10 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 5. 
8.11 Across the Housing Revenue Account activity there is a net reduction in the
projected under spend of £88,000.  This is made up of additional costs in
relation to the garden maintenance contract and energy performance
certificates partially offset by additional staff slippage. 
8.12 As a result of the variances identified above Capital from Current Revenue will
reduce by £88,000. 
9. 2024/25 ADDITIONAL FUNDING 
9.1 Since elected members were provided with the 2024/25 Revenue Budget
update on 18 September 2024 (Report No. 24/260 refers), notification has
been received of additional resources in the current financial year from
several sources as set out below.  To ensure that the 2024/25 Management
Budget continues to reflect the operational requirements of the Council,

Page 11

several adjustments are required, which are summarised below and included
in Appendix 1 and Appendix 6. 
Scottish Government – Revenue Support Grant: 
• Children’s Social Care Pay Uplift - £412,414 (Children, Families &
Justice)
• Children’s Social Care Pay Uplift - £30,586 (Education & Learning) 
• Scottish Milk Subsidy Scheme - £28,000 (Education & Learning) 
• No One Left Behind 2024/25 – Employability Child Poverty Co-
Ordinators - £72,000 (Economy, Development & Planning) 
• 2024-25 local government pay offer (for SJC, Craft and Chief Officers)
- £2.099 million (Corporate Pay award budget – allocated to strategic
leads after processed by payroll) 
9.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £2.642 million will be made through a
redetermination of the Council’s Revenue Support Grant.  It is therefore
necessary to adjust budgets for Children, Families & Justice, Education &
Learning, Economy Development & Planning, Corporate Pay Award and
Revenue Support Grant. 
9.3 ACTION: The Council is asked to approve the adjustments set out at
paragraph 9.1 which are reflected in Appendix 1 (Column 3) to this report. 
Other Funding 
9.4 Other funding amounting to £771,585 will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 5. 
9.5 ACTION: The Committee is asked to note the receipt of £771,585 of
additional resources, with this funding being reflected within Education &
Learning and Strategic Planning, People & Performance as additional grant
income.  The current projected outturn assumes that all these additional
resources will be fully expended in 2024/25 or will be carried forward under
the terms of the grant award. 
10. 2024/25 VIREMENTS 
Contribution to/from Capital Fund 
10.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
10.2 The latest monitoring indicates a projected reduction in capital financing costs
(loan charges) of £18,000 based on the latest treasury management activity
and an increase of £406,000 in income from interest on revenue balances due

Page 12

to improved cashflows.  This will result in an increased Contribution to the
Capital Fund of £424,000 in the current financial year. 
10.3 ACTION: The Committee is requested to approve the virement of £18,000
from the Capital Financing Costs (Loan Charges) Budget and £406,000 to
Interest on Revenue Balances with a corresponding increase in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 5) to this report. 
10.4 At 31 March 2024, the unaudited Annual Accounts included a Capital Fund
balance of £31.026 million.  The Capital Fund is currently projected to peak
in 2025/26 at approximately £38.799 million, before, on the basis of the
approved Council Tax strategy, gradually reducing until being fully utilised in
2061/62. 
Service Virements 
10.5 To ensure that the 2024/25 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 5) that have been
processed in line with the Scheme of Administration.   
11. 2024/25 MOVEMENTS IN RESERVES 
11.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2024 (per unaudited
Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2024/25. 2025/26 and 2026/27.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of unearmarked
Reserves. 
11.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves are
prescribed under legislation and the Council has limited discretion in how
they are applied. 
ii. Balances held for specific (previously approved) purposes – the purpose
of these earmarked Reserves has been previously approved by Council in
either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
11.3 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration.

Page 13

Balances Held Under Statute / Regulation 
11.4 Approval is sought to draw down resources of £383,000 from the Council Tax
Income for Affordable Housing earmarked Reserve.  This will support the
delivery of the Empty Homes Initiative with the payment of grants and
contributions to new builds that will bring more properties back into use. 
11.5 ACTION: The Committee is asked to approve the transfer of £383,000 from
the Council Tax Income for Affordable Housing earmarked Reserve to
Housing & Communities.  This adjustment is reflected in Appendix 1 (Column
5) to the report. 
Balances Held for Specific (Previously Approved) Purposes 
11.6 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
11.7 The drawdown of the resources from the Feasibility and Project Feasibility
Fund earmarked Reserves as set out below will provide capacity to take
forward economic development projects in the current financial year. 
• Feasibility – £100,000
• Project Feasibility Fund – £62,000 
11.8 ACTION: The Committee is asked to approve the transfer of £162,000 from
the Feasibility and Project Feasibility Fund earmarked Reserves to Economy,
Development & Planning.  This adjustment is reflected in Appendix 1
(Column 5) to the report. 
11.9 In addition, in setting the 2024/25 Revenue Budget in February 2024, the
Council Approved Expenditure to fund several specific initiatives.  For a
variety of reasons including consultation and capacity issues, there has been
slippage in the delivery of a few of these projects that may result in the
expenditure not being incurred in the current financial year.  Projects totalling
£103,000 are set out at Appendix 7. 
11.10 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 7 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery.
The final outturn for individual projects may change before the end of the
financial year, therefore, by agreeing the projects within Appendix 7, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves.
11.11 Should any of the projects no longer be a priority, the projected under spend
would be available to support the financial management of the Council in both
current and future financial years. 
11.12 ACTION: The Committee is asked to confirm that the projects listed in
Appendix 7 remain a priority and that the final under spends, currently
projected at £103,000 are transferred to an earmarked Reserve to ensure
delivery.  These adjustments are reflected in Appendix 1 (Column 6) to the
report.

Page 14

Perth and Kinross Health & Social Care Partnership 
11.13 Funding of £190,000 has been requested by Perth & Kinross Integration Joint
Board to provide focussed care and support for those people most at risk of
deconditioning leading to hospital or residential admission. 
11.14 ACTION: The Committee is asked to approve the transfer of £190,000 from
unearmarked Reserves to the Health & Social Care Partnership.  This
adjustment is reflected in Appendix 1 (Column 5) to the report. 
Contribution to Insurance Fund 
11.15 The Council’s Insurance Fund has been under pressure in recent years due to
the increasing cost of annual premiums and several high value claims which
has resulted in the balance on the Fund reducing.  Approval is therefore
sought for an in-year transfer of £200,000 from the General Fund
(unearmarked Reserves) to ensure the sustainability of the Insurance Fund. 
This position will be kept under review and a further pressure may be
introduced for the 2025/26 Revenue Budget in February 2025. 
11.16 ACTION: The Committee is asked to approve the transfer of £200,000 from
unearmarked Reserves to the Insurance Fund.  This adjustment is reflected in
Appendix 1 (Column 5) to the report. 
12. FINANCIAL RISKS 
12.1 In preparing the Council's 2024/25 revenue monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
12.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
12.3 Going forward, new risks will be captured within the body of the report with a
summary being maintained in Appendix 8. 
Perth and Kinross Health & Social Care Partnership 
12.4 Perth and Kinross Health & Social Care Partnership continues to experience
significant financial challenges.  Work is ongoing by the Partnership to
mitigate these but there is a risk that the Council may be required to provide
additional funding in both the current and future financial years. 
Funding Towards Pay Awards 
12.5 The Council has been allocated £2.099 million towards the 2024/25 non-
teaching pay awards.  Until the pay awards are applied, it is not possible to
confirm whether this will meet the additional cost.  This will be updated in the
next monitoring report to Committee in February 2025.

Page 15

13. CONCLUSION 
13.1 Based on the August 2024 ledger, a projected over spend of £885,000 has
been identified in the current financial year. 
13.2 This level of projected over spend will result in a reduction in the level of
unearmarked Reserves to £15.106 million or 3.2% (see Appendix 6). 
13.3 The financial position of the Council and its partners including the Health &
Social Care Partnership and the ALEOs remains challenging and regular
updates will be provided to the Council and the Finance & Resources
Committee as the position develops. 
APPROVED 
Name  Designation Date
Scott Walker  Chief Finance Officer 12 November 2024

Page 16

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.

Page 17

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Strategic Leadership Team have been consulted in the preparation of this
report.

Page 18

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
• Appendix 1 – 2024/25 Management Budget
• Appendix 2 – General Fund 2024/25 Projected Outturn – Service
Analysis
• Appendix 3 – Perth & Kinross IJB 2024/25 outturn
• Appendix 4 – Housing Revenue Account 2024/25 Projected Outturn
• Appendix 5 – Other Fundings
• Appendix 6 – General Fund Balances
• Appendix 7 – Council Approved Projects 2024/25
• Appendix 8 – Financial Risks