Agenda Document Pack - Finance and Resources Committee - 18/09/2024

Perth and Kinross Council · 18 September 2024
Back to Finance and Resources Committee — 18 September 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
11/09/2024 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 18 September 2024 at 14:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Stewart Donaldson  (Convener)
Councillor Grant Laing  (Vice-Convener)
Bailie Chris Ahern
Bailie Alasdair Bailey
Councillor Peter Barrett
Councillor Andy Chan
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor John Duff
Councillor David Illingworth
Provost Xander McDade
Councillor Tom McEwan
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Page 1 of 132

Page 2

Page 2 of 132

Page 3

Finance and Resources Committee 
Wednesday, 18 September 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTES   
3(i)  MINUTE OF MEETING OF FINANCE AND RESOURCES
COMMITTEE OF 12 JUNE 2024 FOR APPROVAL
(copy herewith) 
5 - 8 
3(ii)  MINUTE OF MEETING OF THE EMPLOYEES JOINT
CONSULTATIVE COMMITTEE OF 18 MARCH 2024 FOR
NOTING
(copy herewith) 
9 - 14 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 24/259) 
15 - 16 
5 REVENUE BUDGET 2024/25 - UPDATE NO. 1
Report by Chief Finance Officer (copy herewith 24/260) 
17 - 54 
6 COMPOSITE CAPITAL BUDGET 2024/30 & HOUSING
INVESTMENT PROGRAMME 2024/29 - MONITORING REPORT
NO. 1
Report by Chief Finance Officer (copy herewith 24/261) 
55 - 86 
7 TRANSFORMATION AND CHANGE PROGRAMME UPDATE
Report by Strategic Lead - Projects and Programmes (copy
herewith 24/262) 
87 - 104 
8 POLICY ON DISPOSAL OF MINIBUSES
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 24/263) 
105 - 128
Page 3 of 132

Page 4

9  REVISED SCHEME OF THE EMPLOYEES JOINT
CONSULTATIVE COMMITTEE
(copy herewith 24/264) 
129 - 132 
Page 4 of 132

Page 5

DRAFT
FINANCE AND RESOURCES COMMITTEE
Minute of hybrid meeting of the Finance and Resources Committee held in the
Council Chamber, 2 Hight Street, Perth on Wednesday 12 June 2024 at 1.30pm.
Present: Councillors S Donaldson and G Laing, Bailie C Ahern and Bailie A Bailey,
Provost X McDade, and Councillors P Barrett, A Chan, D Cuthbert, E Drysdale,
J Duff, I James (substituting for Councillor C Shiers), D Illingworth, S McCole
(substituting for Depute Provost A Parrott), T McEwan, J Rebbeck and C Stewart.
In Attendance: T Glen, Chief Executive; C Mailer, Director (Strategy, People and
Resources);  A Williams, Director (Economy, Place and Learning); S Devlin,
E Ritchie, K Steven, S Merone, N Taylor, P Taggart, B Martin-Scott, F MacKay
(Economy, Place and Learning); L Simpson, S Walker, G Boland, S Crawford,
C Guild, P Johnstone, C Robertson, R Graham, K Molley, A Brown and S Dockerill
(Strategy, People and Resources).
Apologies: Depute Provost A Parrott and Councillor and C Shiers.
Councillor S Donaldson, Convener, Presiding.
THE CONVENER LED ON ITEMS 1-6, 8-9 AND 11 AND THE VICE-CONVENER LED ON
ITEMS 7, 10 and 12.
1. WELCOME AND APOLOGIES
The Convener welcomed all those present to the meeting and apologies were
noted as above.
2. DECLARATIONS OF INTEREST
There were no declarations made in terms of the Councillors’ Code of
Conduct.
3. MINUTE OF PREVIOUS MEETING
The minute of meeting of the Finance and Resources Committee of 24 April
2024 was submitted and approved as a correct record.
4. OUTSTANDING BUSINESS STATEMENT
Resolved:
The status of action in the Outstanding Business Statement (24/179) be noted
and completed actions removed accordingly.
5. PEOPLE AND CULTURE STRATEGY 2024-2028
There was submitted a report by the Corporate Human Resources Manager
(24/180) seeking approval of the People and Culture Strategy 202402928 and the
associated action plan.
Resolved:
3(i)
Page 5 of 132

Page 6

DRAFT
(i) The People and Culture Strategy, as set out in Appendix 1 to Report 24/180,
be approved.
(ii) It be agreed that updates on progress of actions in the action plan and any
new or emerging issues arising during the life cycle of the strategy be
reported annually to the Finance and Resources Committee.
6. PROCUREMENT UPDATE
There was submitted a report by Strategic Lead – Legal and Governance
(24/181) providing an update on the Council’s procurement activity, setting out an
Annual Procurement Report for financial year 2023/24 and the planned procurement
activity for future years.
Resolved:
(i) The Procurement Annual Report 2023/24 be approved for publication.
(ii) The record of tenders accepted during 2023/24 under the Council’s scheme of
delegation be noted.
(iii) Monies provided to third parties under the Code of Guidance for Following the
Public Pound during 2023/24 be noted.
(iv) The planned procurement activity, as far as known for future years, be noted.
7. PITLOCHRY ASSET REVIEW
There was submitted a report by Strategic Lead – Property Services (24/182)
seeking approval to consolidate and optimise Council assets and to develop the
community asset offer in Pitlochry in line with the Council’s Corporate Asset
Management Framework, to ensure that our asset base is efficient, effective and fit
for purpose now and in the future within that locality.
Motion (Councillor G Laing and Provost X McDade)
(i) The extensive community engagement undertaken to date within to help
shape the recommendations be noted.
(ii) The review findings, as set out in Section 5 of Report 24/182, be noted.
(iii) The recommendations, as set out in Section 7 of Report 24/182, be approved:
 consolidate community facilities in a redeveloped secondary
school/’community campus’ model, as per Option 2C, with a gym/4 court
games hall.
 remodel and upgrade internal secondary school environment to make
enhanced facilities more functional within existing footprint.
 improve accessibility during and after normal school operating hours for
public library, council services and leisure services at weekends.
 consolidate locality depot arrangements at Aldour depot, declaring
Cloichard depot surplus.
 encourage and support Community Asset Transfer of Cloichard Depot
and Pitlochry Town Hall.
 redevelop Tyree House, the area office/library site as social housing,
redevelop Atholl Leisure Centre site/building for affordable housing
contributing to reducing the unmet demand in Pitlochry area.
 establish a long-term full repair and insurance lease of the Pavilion to
Highland Perthshire Community Partners.
 maintain public toilets (status quo).
Page 6 of 132

Page 7

DRAFT
(iv) The funding option, as set out in Section 5 of Report 24/182, be approved.
Amendment (Councillors P Barrett and T McEwan
consolidate community facilities in a redeveloped secondary
school/’community campus’ model, as per Option 2B, with a gym/2 court
games hall.
In terms of Standing Order 21.5 a roll call vote was taken.
13 members voted for the Motion as follows:
Bailie A Bailie, Councillors D Cuthbert, S Donaldson, E Drysdale, J Duff,
D Illingworth, I James, G Laing, S McCole, Provost X McDade, T McEwan,
J Rebbeck and C Stewart.
3 members voted for the Amendment as follows:
Bailie C Ahern, Councillors P Barrett and A Chan.
Resolved:
In accordance with the Motion.
8. AUTHORITY TO WRITE OFF BAD DEBTS AND OBSOLETE STOCK
There was submitted a report by Strategic Lead – Finance and Business
Support (24/182) seeking approval to write off identified debts in respect of Sales
ledger; Council Tax (including Water & Wastewater charges); Non-Domestic Rates;
Irrecoverable Rents; Housing Benefit Overpayments and Car Park Trading Account
Income; and (2) seeking approval to write off obsolete stock and write off other
miscellaneous balances.
Resolved:
(i) It be approved that all amounts detailed in section 4 of Report 24/182 and
included in appendices 1 to 5 are written off for accounting purposes.
(ii) It be noted that whilst these amounts are written off, the files are not closed,
and every effort will be made to collect outstanding debt where recovery is
cost effective.
(iii) The removal of charges for services for people seeking asylum for a further
year detailed in section 5 of Report 24/182, be approved.
(iv) The revised charges set out in section 6 and appendix 6 of Report 24/182, be
approved.
9. MISSING SHARES PILOT – FEEDBACK AND RECOMMENDATIONS
There was submitted a report by Strategic Lead – Housing and Communities
(24/183) detailing the benefits identified as a result of the pilot and recommends that
the Missing Shares Service be extended for a further 3 years.
Resolved:
The funding of any Missing Shares Service, for a further 3 years, via the
second homes budget, as a recoverable income, be agreed.
Page 7 of 132

Page 8

DRAFT
10. PERTH WEST PROGRESS REPORT 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (24/184) providing members with an update on the progress made in
respect of the funding and income streams that will offset the estimated expenditure
to deliver the first phase of the Perth West investment project.
Resolved:
(i) The anticipated decision path detailed in Report 24/184, be noted.
(ii) It be agreed to proceed with Stage 1 of pre-construction works at an
estimated costs of £1.55m against the capital allocation of £3m in 2024/25.
(iii) It be requested for the Strategic Lead - Economy, Development and Planning,
the Strategic Lead - Legal and Governance and the Strategic Lead – Finance
and Business Support to report back on progress.
11. REQUEST TO DRAW DOWN EARLY LEARNING AND CHILDCARE
RESERVE FOR SUPPORT IN PRIMARY 1
There was submitted a report by Strategic Lead – Education and Learning
(24/185) providing details of the increased support required in Primary 1 and outlines
of the purpose of drawing down funding the Early Learning and Childcare reserve to
meet this level of need.
Resolved:
(i) The contents of Report 24/185, be noted.
(ii) The draw down of Early Learning and Childcare (ELC) reserves of £393,000
in financial year 2024/25 and £243,000 in financial year 2025/26 to provide
additional support in P1 For session 2024/25.
12. DISPOSAL OF MINIBUSES
There was submitted a report by Strategic Lead – Environment and
Infrastructure (24/187) seeking approval to amend the Council’s policy on the
disposal of Fleet and Mechanical Equipment, with specific regard to minibuses which
have reached the end of their operational life within the Council service.
Resolved:
(i) It be agreed that the Disposal of Fleet and Mechanical Equipment Policy is
amended to allow an option to transfer minibuses, if deemed suitable, to
community groups.
(ii) It be requested for officers to develop a policy for disposal of minibuses and
selection criteria for transfer of suitable vehicles to community groups.
Page 8 of 132

Page 9

PERTH AND KINROSS COUNCIL
FINANCE AND RESOURCES COMMITTEE
EMPLOYEES JOINT CONSULTATIVE COMMITTEE 
Minute of hybrid meeting of the Employees Joint Consultative Committee held in
Room 410, 2 High Street, Perth on Monday 18 March 2024 at 2.00pm. 
Present: Representing Perth and Kinross Council: 
Councillors B Leishman, S McCole and J Rebbeck. 
Present: Representing Trade Unions: 
S Hope (UNISON)
V Leonard (GMB)
C Weston (EIS) 
In Attendance:  L Hamilton, P Johnstone, L McGeorge, C Judge, N Taylor,
F Thomson, and D Williams (all Strategy, People and Resources);
F MacKay (Economy, Place and Learning). 
Apologies:   Councillor C Reid, J Kettles, S Robertson and S Topen-Cooper, 
S Hope in the Chair. 
1. WELCOME AND APOLOGIES 
S Hope welcomed all present to the meeting and apologies were noted
above. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF MEETING OF THE EMPLOYEES JOINT CONSULTATIVE
COMMITTEE OF 19 JUNE 2023 FOR APPROVAL 
The minute of meeting of the Employees Joint Consultative Committee of
25 September 2023 was submitted and approved as a correct record. 
4. MATTERS ARISING 
There were no matters arising. 
5. HEALTH AND SAFETY PERFORMANCE REPORT QUARTER 3 – 2023/24 
There was a report submitted (G/24/36) informing and advising the
Employees Joint Consultative Committee in monitoring health and safety
3(ii)
Page 9 of 132

Page 10

compliance and performance across Perth and Kinross Council and providing
an overview of health and safety activities undertaken. 
Resolved:
The contents of Report G/24/36, be noted. 
6. FIRE SAFETY QUARTERLY REPORT – QUARTER 3 – 2023/24 
There was a report submitted by Regulatory Services Manager (G/24/37),
approved by Strategic Lead, Strategic Planning, People and Performance
informing the Employees Joint Consultative Committee in monitoring fire
safety performance across Perth and Kinross Council and providing an
overview of fire safety activities undertaken. 
In introducing the report, L Hamilton advised that reviews of priorities of fire
risk assessments were currently taking place. 
Councillor McCole advised that the Action Plans were not being kept fully
updated, and requested that the importance of this be reinforced. 
Resolved:
The contents of Report G/24/37, be noted. 
7. STAFF REPORTING: INCIDENTS OF VIOLENCE AND AGGRESSION AND
INCIDENTS OF DISTRESSED/CHALLENGING BEHAVIOUR IN
EDUCATION SETTINGS, TERM 2 – 2023/24   
There was submitted a report (G/24/38) by the Strategic Lead – Education
and Learning, informing Employees Joint Consultative Committee of the
Education Service’s performance in managing and reducing incidents of
violence and aggression or distressed and challenging behaviour that has
impacted staff in the workplace. It provides a summary of the information
gathered in Term 2 of academic year 2023/2024 in relation to incidents in
schools and other educational settings which result in an emotional or
physical impact on a member of staff. It also provides information on the
activity of the established Working Group to prevent and reduce the number of
incidents. 
In presenting the report, F MacKay, Education and Learning, advised that
there had been a reduction in incidents of violence and aggression in primary
schools in Perth and Kinross, adding that this had been a real area of focus.
F MacKay also advised that less staff had been involved in repeat incidents,
and that a revised framework for intervention had been introduced. F Mackay
further advised that a Power BI dashboard had been launched for Quality
Improvement Officer’s (QIO’s) to be able to view the appropriate data, and it
was hoped that this would be extended to Headteachers, and also advised
that the working group had looked at schools with a high number of incidents
over Terms One and Two. 
Page 10 of 132

Page 11

C Weston commented that, in terms of year to year comparison, the number
of incidents of violence and aggression was still rising. C Weston added that
she felt it was important for posters in schools to emphasise that inappropriate
behaviours were not acceptable, adding that she also felt it helpful that the
Council provided reassurance to Trade Union members. 
In response to a question from Councillor Rebbeck regarding the working
group, S Hope advised that he felt the work being undertaken was good but
emphasized the importance of now getting this into practice. S Hope added
that he did feel there was an element of under-reporting of incidents and,
having undertaken school visits, felt that some inappropriate behaviour had
become normalized. In response to a further query from Councillor McCole
regarding under-reporting, F MacKay confirmed that one of the purposes of
the working group was to resolve this issue. 
Resolved:
The contents of Report G/24/38, be noted. 
8. FLEXIBLE WORKING FRAMEWORK UPDATE 
There was submitted a report (G/24/39) by the Corporate HR Manager
providing an update on activity to introduce the Flexible Working Framework
following approval by the Finance and Resources Committee in January
2024. 
In introducing the report, F Thomson advised that a disability staff network
meeting had taken place the previous week, and some practical matters had
been raised, such as arrangements and training for Evac-Chairs in Council
buildings. 
In response to a query from C Weston, F Thomson confirmed that this policy
would still apply to teaching staff applying for reduced hours. 
F Thomson advised that more communications would be published in the
coming week, including links to guidance on requests for reduced hours. 
Resolved:
The contents of Report G/24/38, be noted. 
9. HEALTH AND WELLBEING UPDATE 
There was a report submitted by Corporate HR Manager (G/24/40) providing
(i) an update on Health and Wellbeing data; and (ii) providing an update on
current Health and Wellbeing activities. 
Resolved:
The contents of Report G/24/40, be noted. 
Page 11 of 132

Page 12

10. EMPLOYEE SURVEY UPDATE 
There was a report submitted by Corporate HR Manager (G/24/41) providing
an update on the activity that has been taking place and plans for the issue of
the employee survey. 
C Judge advised that the annual employee survey had been stopped in 2018,
with the Council switching to pulse surveys in 2020. C Judge advised that the
decision to bring back the annual survey had been taken with the Chief
Executive, adding that work was being undertaken with the Senior Leadership
Team in this regard. C Judge added that consultation had been taken with the
NHS regarding their staff survey. 
C Judge advised that broad themes were outlined in the report, but advised
that more themes would be added in the survey. C Judge advised that results
would be published at a team level, and that results and next steps would be
outlined at the next meeting of this Committee. 
S Hope added that he felt the workshops which had taken place were really
beneficial, and added the importance of promoting the survey. 
Resolved:
The contents of Report G/24/41, be noted. 
11. PERFORMANCE DEVELOPMENT DISCUSSION UPDATE 
There was a report submitted by Corporate HR Manager (G/24/42) providing
an update on implementation of the Performance and Development
Discussion (PDD) process and plans for future work. 
C Judge advised that the framework had been launched in early January
2024, and since then over 100 employees had completed it, with the feedback
being positive. C Judge further advised that continued support would be
available to managers. 
Resolved:
The contents of Report G/24/42, be noted. 
12. PEOPLE AND CULTURE STRATEGY 
P Johnstone, Corporate HR Manager, delivered a verbal update on the
People and Culture Strategy. 
P Johnstone advised that the new name for the consolidated Human
Resources (HR) and Organisational Development (OD) is ‘People and
Culture’, and that an operating model was presently being looked at. 
P Johnstone advised that it was planned for a People and Culture strategy to
be submitted to the Finance and Resources Committee on 12 June, and that
Trade Unions would be invited to meetings individually.
Page 12 of 132

Page 13

P Johnstone further advised that there would be a shift in HR and OD
provision across the Council, and that a mapping exercise was taking place in
this regard. 
13. ANY OTHER COMPETENT BUSINESS 
The was no other competent business. 
14. DATE OF NEXT MEETING 
17 June 2024. 
Page 13 of 132

Page 14

Page 14 of 132

Page 15

FINANCE AND RESOURCES COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 24/259) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
22. 23 Mar 23 
Executive
Sub-
Committee
Revenue Budget
2022/23 –
Tayside Contracts
The Strategic Lead -
Legal and Governance to
raise the issue of the
75% rule and the
possibility of flexible
voting arrangements with
the Clerk of Tayside
Contracts Joint
Committee and the Head
of Legal at Angus
Council. 
The Strategic Lead – Legal
and Governance to meet
with the Clerk of Tayside
Contracts Joint Committee
and the Head of Legal at
Angus Council over the
Summer recess to discuss
the voting arrangements. 
Lisa Simpson 18
September
2024
18
September
2024
25. 12 June
2024
Item 5.
People and
Culture Strategy
2024-2028
A table on Perth &
Kinross estimated
population by sex and
single year of age in PKC
area of Scotland be
shared with members.  
Email response was
circulated to members (26
July). 
COMPLETED 
Pauline
Johnstone 
18
September
2024 
18
September
2024 
26. 12 June 
2024
Item 11.
Request to Draw
Down Early
Learning and
Childcare
A report to be shared with
members on the different
categories and trends of
children and young
Email response was
circulated to members (8
August). 
Sheena Devlin 18
September
2024 
18
September
2024 
4
Page 15 of 132

Page 16

No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
Reserve for
Support in
Primary 1 
people with additional
support needs within
Perth and Kinross ELC
settings and schools. 
COMPLETED 
27. 12 June
2024
Item 12.
Policy on
Disposal of
Minibuses 
A policy for disposal of
minibuses and selection
criteria for transfer of
suitable vehicles to
community groups be
submitted to the Finance
and Resources
Committee.
A report will be submitted to
the Finance and Resources
Committee on 18
September 2024. 
COMPLETED 
Fraser Crofts  18
September
2024 
18
September
2024 
Page 16 of 132

Page 17

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
13 SEPTEMBER 2024 
REVENUE BUDGET 2024/25 – UPDATE NO. 1 
Contact Officer: Scott Walker, Chief Finance Officer
(Report No. 24/260) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2024/25 General Fund
Revenue Budget based upon the June 2024 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected over spend on the 2024/25 General Fund
Management Budget is £1.608 million (£1.008 million at this time in 2023/24)
(see Appendix 1). 
2. RECOMMENDATIONS 
The Committee is requested to: 
A. note the contents of the report,
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2,
C. note the projected outturn for Corporate Budgets set out in Section 6,
D. note the funding update provided in Section 7,
E. note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 3,
F. approve the adjustments to the 2024/25 Management Revenue Budget
detailed in Sections 10,11 & 12 and Appendices 1, 2, 4, 5, 6, 7 and 8,
G. note the financial risks set out in Section 13 and Appendix 9. 
3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 Issues Arising from Financial Year 2023/24
Section 10 2024/25 Additional Funding
Section 11 2024/25 Virements
Section 12 2024/25 Movements in Reserves
Section 13 Financial Risks
Section 14 Conclusions  
5
Page 17 of 132

Page 18

4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2024/25 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the June 2024 ledger, updated
for any subsequent known material movements. 
4.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2024/25 Revenue Budget on 28
February 2024 (Report No. 24/63 refers).  In addition, adjustments approved
by the Finance & Resources Committee on 24 April 2024 (Report No. 24/130)
are reflected in Appendix 1 (Column 2). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 The total net projected over spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £1.402 million which represents
0.4% of total net Service expenditure. 
5.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
5.3 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets. 
Education & Learning 
5.5 The projected outturn for Education & Learning excluding Devolved School
Management (DSM) and the Pupil Equity Fund (PEF) is currently anticipated
to be £873,000 or 0.5% more than budget.  The individual elements
contributing to this position are summarised in the following table and with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Education & Learning Core Under spend (5) (0.4) n/a
Nursery Sector Under spend (677) (2.9) n/a
Primary Sector Over spend 1,484 3.2 n/a
Secondary Sector Over spend 80 2.1 n/a
Special Sector Under spend (9) (0.05) n/a
TOTAL Over spend 873 0.5% n/a 
5.6 Within the Nursery Sector there is a projected under spend of £677,000. 
This is due to additional staff slippage in excess of the budgeted target as well
Page 18 of 132

Page 19

as projected under spends on deferred places due to levels of uptake that are
currently less than that budgeted. 
5.7 In the Primary Sector there is a projected overspend of £1.484 million
because the budgeted slippage target is currently not being met.  As outlined
in previous updates, all classes require to be appropriately staffed. 
5.8 Within the Secondary Sector there is a projected overspend of £80,000
because the slippage target is currently not being met and increased loan
charges. 
5.9 The Devolved School Management Scheme is currently projected to be on
target.  However, schools are experiencing challenges in delivering approved
staff slippage targets and facing inflationary pressures against budgets that
have been reduced over previous years.  The budgets for the Devolved
School Management scheme are allocated by financial year (April – March),
whereas expenditure is incurred by academic year (August – June). 
5.10 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2025.  It is anticipated that the projected under
spend on teacher and support costs will be carried forward to 2025/26 to meet
commitments.  The budgets for the Pupil Equity Fund scheme are allocated
by financial year, whereas expenditure is incurred by academic year. 
Children, Families & Justice 
5.11 The projected outturn for Children, Families & Justice is currently
anticipated to be on target against budget.  The individual elements
contributing to this position are summarised in the following table and with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Children & Families On target 0 - n/a
Justice Service On target 0 - n/a
TOTAL On Target - - n/a 
5.12 Despite Children & Families being on target against budget, there are
projected over spends because slippage targets are not currently being met
and additional residential placements.  This is offset by projected under
spends on foster, kinship and adoption payments. 
Housing & Communities 
5.13 The projected outturn for Housing & Communities is currently anticipated to
be £10,000 or 0.1% less than budget.  The individual elements contributing to
this position are summarised in the following table and with narrative on the
significant variances below. 
Page 19 of 132

Page 20

Function Projected Outturn Movement 
£’000 % £’000
Service Wide Under spend (75) (0.8) n/a
Housing General Fund Over spend 50 0.6 n/a
Bereavement Services Over spend 15 1.9 n/a
TOTAL Under spend (10) (0.1)% n/a 
5.14 On a Service Wide basis, there is a projected under spend of £75,000 due to
staff slippage in excess of the budgeted target. 
5.15 Within the Housing General Fund there is a projected over spend of £50,000
due to void rent loss on housing support properties and increased costs
relating to homelessness. 
Property Services 
5.16 The projected outturn for Property Services is currently anticipated to be
£686,000 or 1.0% more than budget.  The individual elements contributing to
this position are summarised in the following table and with narrative on the
significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Service Wide  Over spend 426 0.6 n/a
Energy Under spend (300) (3.5) n/a
Maintenance Over spend 150 3.2 n/a
Facilities Management Over spend 240 3.9 n/a
Catering Over spend 170 2.4 n/a
TOTAL Over spend 686 1.0% n/a 
5.17 On a Service Wide basis, there is a projected over spend of £426,000.  This
is because, currently, slippage targets are not being met, delays in delivering
savings from operational buildings which are partially offset by additional
income. 
5.18 On Energy, there is a projected under spend of £300,000 due to reduced
rates and consumption. 
5.19 On Maintenance, there is a projected over spend of £150,000 because of
responsibility for Bells Sports Centre transferring back to the Council. 
5.20 Within Facilities Management, there is a projected over spend of £240,000. 
This is due to a delay in implementing the approved savings following
consultation and implementation of the saving from the beginning of the
academic year, i.e. August 2024. 
5.21 In Catering there is a projected over spend of £170,000.  This is due to actual
meals delivered from April to June 2024 being 3% higher than budgeted
position with the increase mainly in free school meals. 
Page 20 of 132

Page 21

Legal & Governance 
5.22 Within Legal & Governance there is a projected over spend of £40,000 or
0.9%.  This is because, currently, slippage targets are not being met, partially
offset by projected under spends on supplies & services and additional
income. 
Customer & Digital 
5.23 The projected outturn for Customer & Digital is currently anticipated to be
£187,000 or 1.6% more than budget.  The main reasons for this are projected
over spends on service charges from social housing providers and supplies &
services including printing and interpreter services. 
Strategic Planning & Performance 
5.24 Within Strategic Planning & Performance, there is a projected under spend
of £44,000 or 0.6%, on staff costs and supplies & services and additional
income. 
Finance & Business Support 
5.25 The projected outturn for Finance & Business Support is currently
anticipated to be £350,000 or 4.0% less than budget.  The individual elements
contributing to this position are summarised in the following table and with
narrative on the significant variances below. 
Function Projected Outturn Movement 
£’000 % £’000
Finance Over spend 17 0 n/a
Business Support Under spend (367) (9.0) n/a
TOTAL Under spend (350) (4.0)% n/a 
5.26 Across Business Support, there is a projected under spend of £367,000 on
staff costs due to the accelerated delivery of approved savings. 
6. REVENUE MONITORING – CORPORATE BUDGETS 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Health & Social care 
6.2 On 21 August 2024, Perth & Kinross Integration Joint Board (IJB) were
advised that, consistent with many other integration joint boards, they face
significant financial challenges in the current financial year. 
6.3 Based on activity to 30 June 2024 (month 3), there is a projected over spend
of £8.1 million. There are several areas that are causing this projected over
spend as follows.
Page 21 of 132

Page 22

• Prescribing
• Out of Hours GP services (Angus IJB Lead Partner for all Tayside)
• Care at Home (all care groups)
• Unfunded Inpatient Beds
• Older People Care Home Placements
• Senior Medical cover
• Delivery of approved savings 
6.4 The IJB does have limited Reserves that can be applied, but these are
insufficient to deal with the entirety of the current projected over spend. 
6.5 An updated and more comprehensive financial position, based on the first four
months of expenditure, will be presented to the IJB’s Audit & Performance
Committee on 23 September 2024.  This update will incorporate the impact of
any recovery actions that are already underway including vacancy
management and reducing discretionary spend. 
6.6 A financial recovery plan will be presented to the IJB on 2 October 2024, and
this may require the IJB to issue amendments to existing directions or
consider additional directions. 
6.7 The Finance & Resources Committee will receive a further update at the
meeting on 21 November 2024 
Council Tax Reduction Scheme 
6.8 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.9 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements. 
6.10 In the current financial year, the Council is supporting approximately 8,600
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.91 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £150,000
which is reflected in Appendix 1. 
7. REVENUE MONITORING – FUNDING 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
Page 22 of 132

Page 23

7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 August 2024 together
with prior year comparative figures for the previous five financial years. 
7.4 Between 2019/20 and 2023/24, the average collection figure to 31 August was
45.92%.  The actual collection figure to 31 July 2024 was 37.17% which is
consistent with the five-year average, but a 0.25% reduction on the
comparable position in 2023. 
7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
Page 23 of 132

Page 24

7.6 Given the 2024/25 collection figures that are set out at paragraph 7.4 above is
consistent with previous years, and that the growth in the number of Band D
equivalent properties is in line with expectations, it is currently anticipated that
Council Tax income is on target for the current year. 
Non-Domestic Rates 
7.7 The actual collection rate to 31July 2024 was 28.26%, compared to 22.89%
for the same period in 2023/24. 
8. REVENUE MONITORING – OTHER UPDATES 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 Currently, for the current financial year, all three ALEOs are projecting a
deficit that is in line with their approved budgets. 
8.3 The long-term sustainability of the Council’s ALEOs across future financial
years will be kept under review with updates provided to future meetings of
the Finance & Resources Committee. 
8.4 Following a change in regulations and potential claims by trade unions
relating to moving away from nationally determined pay agreements, it is
Page 24 of 132

Page 25

proposed that Culture Perth and Kinross (CPK) realign their pay structure to
that of the Council and Scottish Joint Committee (SJC) rates of pay to mitigate
against any potential challenges by the unions. 
8.5 CPK have advised that they have funds to do this in the current financial year
from their own Reserves but will require additional funding to build this into
their future cost model which will come back as a budget pressure from
2025/26 onwards. 
8.6 The cost is approximately £121,000, calculated using data from 2023/24 staff
cost model. The 2024/25 pay award is not yet known and therefore the total
cost will be higher. 
Tayside Contracts 
8.7 The operating environment for Tayside Contracts remains challenging.  They
continue to experience significant inflationary pressures on the price of staple
foods – beyond that of the headline CPI and RPI rates quote more widely. 
8.8 Beyond that, negotiations on the 2024/25 pay award are still ongoing.  Should
the outcome of the negotiations exceed budgeted levels, without sufficient
external funding forthcoming, there is a risk that this will cause a further
significant risk to the profitability of Tayside Contracts. 
8.9 Tayside Contracts continue to identify mitigating actions and the three
constituent Councils are looking at how they may assist.  Work will continue
between officers of the Council and Tayside Contracts to further refine these
projections. 
8.10 Both of these pressures may impact on the Council in the form of a request
for additional financial support, as has been the case in previous financial
years and / or the non-achievement of the budgeted income from the share of
Tayside Contract’s surplus. 
8.11 At this stage, the potential costs of providing additional financial support have
not been factored into the Council’s projections.  Any proposal to provide
additional funding to Tayside Contracts will be brought back to a future
meeting of the Finance & Resource Committee for approval by elected
members. 
8.12 In addition, given the financial challenges facing Tayside Contracts, there is a
risk that the budgeted amount from the Trading Operations surplus of
£550,000 will not be received in the current year. 
Housing Revenue Account 
8.13 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 5. 
Page 25 of 132

Page 26

8.14 Across the Housing Revenue Account activity there is a net projected under
spend of £207,000.  This is made up of additional income from Interest on
Revenue Balances and staff slippage which is partially offset by projected
over spends on energy and transport costs. 
8.15 As a result of the variances identified above Capital from Current Revenue will
increase by £207,000. 
9. ISSUES ARISING FROM FINANCIAL YEAR 2023/24 
9.1 In completing the 2023/24 Unaudited Annual Accounts, two issues have been
identified which require adjustments to be made to the 2024/25 Management
Budget. 
Devolved School Management / Pupil Equity Fund Balances 
9.2 In setting the 2024/25 Final Revenue Budget on 28 February 2024 (Report
No. 24/63 refers), the Council approved a projected Devolved School
Management (DSM) carry forward of £239,000.  However, the final under
spend (which included agreed planned carry forwards) on the DSM scheme
was £501,000 which is £262,000 more than anticipated. This level of under
spend is well within the limits of the DSM scheme and it is normal practice to
reflect this adjustment at this time. 
9.3 Similarly, the Council approved a projected Pupil Equity Funding carry
forward of £100,000.  However, the final under spend was £116,000 which is
£16,000 more.  Schools spent 94.3% of their total Pupil Equity Funding in
2023/24. 
9.4 ACTION: The Committee is requested to increase the Education & Learning
budget by £278,000 to reflect the actual Devolved School Management
scheme and Pupil Equity Fund balances brought forward from 2023/24.  This
adjustment is reflected in Appendix 1 (Column 3) to this report and has no
overall impact on the level of uncommitted Reserves. 
Revenue Grants 
9.5 Accounting arrangements under International Accounting Standards require
that, subject to certain conditions, revenue grants which were received by the
Council in 2023/24 but not utilised by 31 March 2024 should be accounted for
in Reserves at the end of the financial year.  Approval is therefore sought to
draw down £7.832 million in 2024/25 from the earmarked Reserve for
Revenue Grants.  These revenue grants are set out in detail in Appendix 4. 
9.6 Approval is now sought to adjust the following budgets 
• Education & Learning - £1.364 million, 
• Children, Families & Justice - £1.3 million,
• Economy, Development & Planning - £2.670 million,
• Environment & Infrastructure - £146,000,
• Housing & Communities - £2.209 million,
Page 26 of 132

Page 27

• Property Services - £5,000,
• Health & Social Care - £138,000. 
9.7 ACTION: The Committee is asked to approve the adjustments totalling
£7.832 million to the above Service budgets (set out in detail in Appendix 4),
funded from Reserves, to reflect revenue grants received in 2023/24 in
respect of expenditure which will not be incurred until 2024/25.  These
additional adjustments are reflected in Appendix 1 (Column 3) to this report
and have no overall impact on the budgeted level of uncommitted Reserves. 
10. 2024/25 ADDITIONAL FUNDING 
10.1 Since elected members were provided with the 2024/25 Revenue Budget
update on 24 April 2024 (Report No 24/130 refers), notification has been
received of additional resources in the current financial year from several
sources as set out below.  To ensure that the 2024/25 Management Budget
continues to reflect the operational requirements of the Council, several
adjustments are required, which are summarised below and included in
Appendix 1 and Appendix 6. 
Scottish Government – Revenue Support Grant: 
• Local Government Pay Offer 2023/24 for 2024/25: £570,000
(Reserves)
• ELC 1140 Funding: £440,800 (Education & Learning)
• Teachers Induction Scheme: £31,020 (Education & Learning) 
10.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £1.042 million will be made through a
redetermination of the Council’s Revenue Support Grant.  It is therefore
necessary to adjust budgets for Education & Learning, Reserves and
Revenue Support Grant. 
10.3 ACTION: The Council is asked to approve the adjustments set out at
paragraph 10.2 which is reflected in Appendix 1 (Column 4) to this report. 
Other Funding 
10.4 Other funding amounting to £7.226 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 6. 
10.5 ACTION: The Committee is asked to note the receipt of £7.226 million of
additional resources, with this funding being reflected within Education &
Learning; Children, Families & Justice, Economy, Development & Planning,
Environment & Infrastructure and Housing & Communities, as additional grant
income.  The current projected outturn assumes that all these additional
resources will be fully expended in 2024/25 or will be carried forward under
the terms of the grant award. 
Page 27 of 132

Page 28

11. 2024/25 VIREMENTS 
Contribution to/from Capital Fund 
11.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
11.2 The latest monitoring indicates a projected increase in capital financing costs
(loan charges) of £1.864 million based on the latest treasury management
activity and an increase of £68,000 in income from interest on revenue
balances due to rising rates.  This will result in a reduced Contribution to the
Capital Fund of £1.796 million in the current financial year. 
11.3 ACTION: The Committee is requested to approve the virement of £1.864
million to the Capital Financing Costs (Loan Charges) Budget and £68,000 to
Interest on Revenue Balances with a corresponding reduction in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 5) to this report. 
11.4 At 31 March 2024, the unaudited Annual Accounts included a Capital Fund
balance of £31.026 million.  The Capital Fund is currently projected to peak
in 2024/25 at approximately £37.0226 million, before, on the basis of the
approved Council Tax strategy, gradually reducing until being fully utilised in
2060/61. 
Service Virements 
11.5 To ensure that the 2024/25 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 5) that have been
processed in line with the Scheme of Administration.   
12. 2024/25 MOVEMENTS IN RESERVES 
12.1 Included at Appendix 7 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2024 (per
unaudited Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2024/25. 2025/26 and 2026/27.
• The impact of proposals within this report on earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves. 
12.2 The earmarked Reserves are brigaded under three headings as follows: 
Page 28 of 132

Page 29

i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied. 
ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
12.3 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
earmarked Reserves under iii. above will include more detail for elected
member consideration. 
Balances Held Under Statute / Regulation 
12.4 The application of these earmarked Reserves was considered earlier in this
report in Section 9. 
Balances Held for Specific (Previously Approved) Purposes 
12.5 Theses earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
The proposals listed below are simply about the transfers in and out of
earmarked Reserves to take forward approved proposals. 
• Contribution to 2024/25 Revenue Budget - £149,000
• Culture - £191,000
• Council Tax Income for Missing Shares Scheme - £48,000
• School Estate - £313,000
• Ventilation Measures - £76,000
• Health & Social Care – Care at Home & Reablement - £800,000
• Health & Social Care – Focussed care and support for those people
most at risk of deconditioning leading to hospital or residential care
admission - £200,000 
Balances Held for Other Purposes 
12.6 The Transformation & Workforce Management earmarked Reserve was
created to provide the funding required to take forward the Transformation
and Change Programme as well as fund the financial implications of
workforce changes. 
12.7 Approval is sought to transfer £380,000 from the Transformation & Workforce
Management earmarked Reserve to ensure completion of several previously
approved projects. 
12.8 ACTION: The Committee is asked to approve the transfer of £380,000 to the
Transformation & Earmarked Reserve with adjustments reflected in Appendix
1 (Column 6) to the report.
Page 29 of 132

Page 30

12.9 Furthermore, under the Framework for Managing Workforce Change, the
authority to approve voluntary severance requests sits with the Executive
Leadership Team, except for requests from Chief Officers.  With that in mind,
approval is sought to draw down £373,000 from the Transformation and
Workforce Management earmarked Reserve to fund voluntary severance
requests.  These voluntary severance request will support the delivery of
savings previously approved by Council and payback in less than two years.   
12.10 ACTION: The Committee is asked to approve the transfer of £373,000 from
the Transformation & Earmarked Reserve with adjustments reflected in
Appendix 1 (Column 6) to the report. 
12.11 Approval is sought to drawdown funding from the Anti-Poverty earmarked
Reserve totalling £330,000.  This will augment the Scottish Welfare Fund
budget to ensure that the most vulnerable in our area have access to a
dignified, cash response to crisis situations. This additional funding will allow
the Council to meet the demand of low-income households struggling to meet
the rise in cost of living and will allow vulnerable residents to maintain
independent living in the community.  Furthermore, this funding will allow us to
continue to support all P&K residents in crisis and support those on low
incomes living rurally. 
12.12 ACTION: The Committee is asked to approve the transfer of £330,000 from
the Anti-Poverty earmarked Reserve to the Financial Insecurity Fund.  This
adjustment is reflected in Appendix 1 (Column 6) to the report. 
12.13 In 2023/24, Perth & Kinross Council provided funding of £250,000 for the
Warm Welcome Fund Initiative. This was a re-brand of the previous years’
Cost of Living Fund. The aim of the funding was to support community groups
and organisations in their delivery of the provision of warm spaces and warm
home packs over the winter months to help alleviate the cost of living whilst
also contributing to a reduction in social isolation.  The fund supported 94
projects and the feedback from community groups and recipients was very
positive. 
12.14 Delivery of the fund in 2024 involved the Community Learning & Development
team facilitating workshops within each ward area for groups and
organisations committed to providing warm spaces. During the Education
Scotland Progress Visit in April 2024 which reviewed our progress in
delivering the Community Learning and Development Plan the Warm
Welcome Fund was highlighted as a positive example of enabling local people
to finding local solutions to inequalities. 
12.15 It is proposed that for 2024/25 an allocation of £200,000 will be allocated to
the Warm Welcome Fund divided per ward based on population size. Groups
and organisations within these areas will be invited to negotiate their specific
funding needs in order to implement their proposals. This approach promotes
fairness, encourages community collaboration, and minimises the duplication
of services across different areas. 
Page 30 of 132

Page 31

12.16 The funding criteria will be updated as follows: 
• Funding is exclusively for the provision of warm spaces.
• Groups and organisations must commit to collaborating with broader
services, such as welfare rights, to ensure that the most vulnerable
attendees can maximise their incomes, thereby achieving longer-term
positive outcomes in addressing poverty. This may involve providing
signposting and incorporating support organisations into the warm
space programmes.
• Warm home packs are not included under this funding. Individuals
requiring assistance to stay warm at home should be directed to
welfare rights for appropriate support and advice. 
12.17 ACTION: The Committee is asked to apply £200,000 from the Anti-Poverty
earmarked Reserve to take forward the Warm Welcome Fund Initiative.  This
adjustment is reflected in Appendix 1 (Column 6) to the report. 
12.18 In addition, in setting the 2024/25 Revenue Budget in February 2024, the
Council Approved Expenditure to fund several specific initiatives.  For a
variety of reasons including consultation and capacity issues, there has been
slippage in the delivery of a few of these projects that may result in the
expenditure not being incurred in the current financial year.  Projects totalling
£70,000 are set out at Appendix 8. 
12.19 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 7 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery.
The final outturn for individual projects may change before the end of the
financial year. Therefore, by agreeing the projects within Appendix 8, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves. 
12.20 Should any of the projects no longer be a priority, the projected under spend
would be available to support the financial management of the Council in both
current and future financial years. 
12.21 ACTION: The Committee is asked to confirm that the projects listed in
Appendix 8 remain a priority and that the final under spends, currently
projected at £70,000 are transferred to an earmarked Reserve to ensure
delivery.  These adjustments are reflected in Appendix 1 (Column 6) to the
report. 
Local Government By-Elections 
12.22 Following resignations over the Summer, by-elections for Ward 7 – Strathallan
and Ward 11 – Perth City North will take place on Thursday 26 September
2024.  The estimated cost of running these by elections is £80,000.  There are
economies of scale to the Council from running both events on the same day. 
Council officers did also investigate whether other Councils were in a position
to share the costs of count centre but this did not prove practical. 
Page 31 of 132

Page 32

12.23 ACTION: The Committee is asked to approve the transfer of £80,000 from
unearmarked Reserves to Finance & Business Support to fund the two by-
elections on Thursday 26 September 2024.  This adjustment is reflected in
Appendix 1. 
13. FINANCIAL RISKS 
13.1 In preparing the Council's 2024/25 revenue monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
13.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
13.3 Going forward, new risks will be captured within the body of the report with a
summary being maintained in Appendix 8. 
Budgeted Slippage Targets 
13.4 Across all Council Services there is an approved staff slippage target of 5%
(excluding teachers).  The ability to manage this target is limited in early
learning and childcare and school settings due to the requirement to fill all
vacancies as they arise.    It is also challenging due to the national
requirement to maintain the teacher number ratio.  Teaching slippage targets
are currently not being met across all school settings. 
Financial Insecurity Funding 
13.5 The Council has directed significant levels of non-recurring funding towards
the Scottish Welfare Fund and the Financial Insecurity Fund to support
vulnerable individuals and families with the cost-of-living pressures in recent
years. In addition, the Council has received external funding which it has also
directed to provide additional support. 
13.6 As things stand, this additional funding will not be available in 2025/26.  This
may result in the Council having to raise the priority rating for the Scottish
Welfare Fund to “high, most compelling”, which would be a first for Perth &
Kinross Council.  It may result in the provision of less dignified support during
times of crisis and push households in crisis to community groups that would
struggle to cope with the demand.  It may also cut across the ambition of
Cash-First. 
2024/25 Pay Awards 
13.7 The non-teaching pay awards for 2024/25 have not yet settled.  The Scottish
Government have committed to funding the cost of these pay awards in
excess of 3.2% - the Council has budgeted for 3%.  There is a likely cost in
the current year as well as a risk for future years that the final increases
Page 32 of 132

Page 33

exceed both the current budgetary provision and external recurring funding
made available by the Scottish Government. 
13.8 Any shortfall could lead to further pressures on Reserves and / or cuts in
service delivery. 
13.9 Similarly, the teaching pay awards have not yet been settled and there is a
risk that the 3% budgeted for by the Council is insufficient and external
Scottish Government support will be required. 
Tayside Contracts 
13.10 There is a risk that the Council is required to provide additional funding for
Tayside Contracts to contribute towards higher inflation costs, reduced
demand for school meals and a pay award that exceeds budgeted levels. 
Funding 
13.11 The 2024/24 Revenue Budget includes two material funding assumptions. 
Firstly, that the funding for teachers’ superannuation contributions (employer)
flows from the UK Government to the Scottish Government through to the
Council.  Secondly, that the Council meets the requirements to maintain the
pupil teacher ratio and therefore grant is not withheld. 
14. CONCLUSION 
14.1 Based on the June 2024 ledger, a projected over spend of £1.608 million has
been identified in the current financial year. 
14.2 This level of projected over spend will result in a reduction in the level of
unearmarked Reserves to £14.773 million or 3.2% (see Appendix 7). 
14.3 The financial position of the Council and its partners including the Health &
Social Care Partnership and the ALEOs remains challenging and regular
updates will be provided to the Council and the Finance & Resources
Committee as the position develops. 
APPROVED 
Name  Designation Date
Scott Walker  Chief Finance Officer 10 September 2024 
Page 33 of 132

Page 34

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 34 of 132

Page 35

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Strategic Leadership Team have been consulted in the preparation of this
report.
Page 35 of 132

Page 36

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix 1 – 2024/25 Management Budget
Appendix 2 – General Fund 2024/25 Projected Outturn – Service Analysis
Appendix 3 – Perth & Kinross IJB 2024/25 outturn
Appendix 4 – Revenue Grants
Appendix 5 – Housing Revenue Account 2024/25 Projected Outturn
Appendix 6 – Other Fundings
Appendix 7 – General Fund Balances
Appendix 8 – Council Approved Projects 2024/25
Appendix 9 – Financial Risks 
Page 36 of 132

Page 37

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
2024/25 Previously Issues Movements Virements Movements 2024/25 Projected Variance Variance
Council Approved Arising in in Revised Outturn to to
Approved Adjustments From Funding Reserves Mgt Revised Revised
Budget (Net) 2023/24 Budget Mgt Mgt
Accounts Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 1
Service Budgets
Education & Learning 166,774 (3,605) 1,626 472 (50) 131 165,348 166,221 873 0.5%
Children, Families & Justice 25,284 5 1,300 26,589 26,589 0 0.0%
Economy, Development & Planning 13,925 593 2,646 193 17,357 17,357 0 0.0%
Environment & Infrastructure 34,642 110 146 34,898 34,898 0 0.0%
Housing & Communities 17,878 250 2,233 178 20,539 20,529 (10) (0.0%)
Property Services 65,471 115 5 462 66,053 66,739 686 1.0%
Legal & Governance 4,381 142 50 4,573 4,613 40 0.9%
Customer & Digital Services 10,302 958 347 11,607 11,794 187 1.6%
Strategic Planning, People & Performance 5,948 1,166 62 7,176 7,132 (44) (0.6%)
Projects & Programmes 131 178 309 309 0 0.0%
Finance & Business Support 8,227 331 50 80 8,688 8,338 (350) (4.0%)
Directorate Core Costs 1,003 373 1,376 1,396 20 1.5%
Sub - Total: Service Budgets 353,966 65 7,956 472 0 2,054 364,513 365,915 1,402 0.4%
SECTION 2
Corporate Budgets
Health & Social Care 87,498 6,764 138 1,102 95,502 95,502 0 0.0%
Contribution to Valuation Joint Board 1,466 1,466 1,466 0 0.0%
Capital Financing Costs 16,628 1,864 18,492 18,492 0 0.0%
Interest on Revenue Balances (5,411) (68) (5,479) (5,479) 0 0.0%
Net Contribution to/(from) Capital Fund 6,710 (1,796) 4,914 4,914 0 0.0%
Contribution to/(from) Insurance Fund 200 200 200 0 0.0%
Trading Operations Surplus (550) (550) (550) 0 0.0%
Support Service External Income (2,238) (2,238) (2,238) 0 0.0%
Tayside Pension Fund 1,655 1,655 1,711 56 3.4%
Apprenticeship Levy 956 956 956 0 0.0%
Leadership and procurement targets (1,505) (1,505) (1,505) 0 0.0%
Council Tax Reduction Scheme 7,400 7,400 7,550 150 2.0%
Discretionary Relief 1,104 1,104 1,104 0 0.0%
Net Expenditure (General Fund) 467,879 6,829 8,094 472 0 3,156 486,430 488,038 1,608 0.33%
SECTION 3
Funding
Revenue Support Grant (275,985) (4,266) (1,042) (281,293) (281,293) 0 0.0%
Ring Fenced Grant (3,806) (3,806) (3,806) 0 0.0%
Non Domestic Rate Income (65,152) (203) (65,355) (65,355) 0 0.0%
Council Tax Income (107,517) (107,517) (107,517) 0 0.0%
Capital Grant (1,600) (139) (1,739) (1,739) 0 0.0%
Total Financing (454,060) (4,608) 0 (1,042) 0 0 (459,710) (459,710) 0 0.0%
Financed from/(returned to) Reserves 13,819 2,221 8,094 (570) 0 3,156 26,720 28,328 1,608
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2024/25 REVENUE
BUDGET - SUMMARY
APPENDIX
1
5
Page 37 of 132

Page 38

Page 38 of 132

Page 39

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2024/25 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 June 2024)
Variance Variance
£'000 £'000
EDUCATION & LEARNING
Total 873
NON DEVOLVED
Education & Learning Core
(5) Staff slippage over and above budgeted target due to delay in filling post.
Nursery Sector
(677) Projected additional slippage due to turnover of staff and lower than anticipated staffing required
for deferred places.
Primary Sector
1,484 Slippage target currently not being met within primary sector partly due to Scottish Government
directive of maintaining teacher numbers and the requirement to have a teacher in front of class at
all times. 
Secondary Sector
80 Projected overspend due to slippage target currently not being met and increased loan charges.
Special Sector
(303) Additional slippage due to turnover of staff and challenges in recruitment of posts in particular
Pupil Support Assistants.
294 Projected overspend on Residential placements due to increased number of placements. Average
placements 23/24 = 17.25 24/25 =23.
Home to School Transport
0 No material variances at present
DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
0 The projected position for DSM is on budget at this time. Schools are finding slippage targets and
increasing costs challenging to manage. This has been impacted by the Scottish Government
freeze on teacher numbers and per capita budgets allocations have not increased since a 25%
reduction was agreed in 2016/17. Inflation has risen by 37% in the same period.
PUPIL EQUITY FUND
100 At this time £100,000 is projected to be carried forward into 2025/26 for teacher and support staff
costs to the end of the current academic year.
(100) Projected carry forward of Pupil Equity Funding.
CHILDREN, FAMILIES & JUSTICE
Total 0
Children & Families
87 Projected overspend in staffing due to not meeting slippage target offset by additional income for
Children Alone Seeking Asylum placements and Wellbank.
(331) Projected under spend on foster, kinship and adoption in part due to reduction external in foster
carers.
244 Projected over spend on residential placements due to an additional three in excess of budget until
December 2024.
0 Justice Service
No material variances at present
ECONOMY DEVELOPMENT & PLANNING
Total 0
No material variances at present
ENVIRONMENT & INFRASTRUCTURE
Total 0
No material variances at present
HOUSING & COMMUNITIES
Total (10)
Service Wide
(75) Projected slippage across Housing & Communities in excess of slippage target
Housing General Fund
15 Void rent loss for housing support properties
35 Projected increase in homeless costs including bad debts and energy costs.
Bereavement Services
15 Projected over spend on loan charges
SERVICE Summary of Service Variances
5
Page 39 of 132

Page 40

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2024/25 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 30 June 2024)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
PROPERTY SERVICES
Total 686
Service Wide
223 Projected shortfall against slippage target
311 Projected shortfall due to delays in delivering the Pullar House mothballing saving partially offset
by an  under spend on water.
(7) Projected various under / over spends on supplies & services, third party payments and capital
financing costs.
(101) Projected additional income from capital recharges (£94,000) & commercial lets (£82,000) partially
offset against a shortfall in RHI Income (£75,000).
Energy
(300) Projecting reduced energy costs due to reduced rates and consumption
Maintenance
150 Projecting increased costs associated with the transfer of Bell's sports centre
Facilities Management
240 Delay in implementing new cleaning schedule required to achieve £406,000 Tayside Contract
approved saving. This was due to the requirement to consult with trade unions. Implemented
reduced cleaning days for schools from August 2024.
Catering
170 Increased uptake on meals projected at an additional 64,000 by year end. This includes a 10%
uplift in nursery meals (total meals projected 2.1 million for full year). This equates to approx
£120,000 shortfall based on the average price of £4.36 per meal (was previously £4.74) against
the cost charged to the pupil of £2.25 for a Primary meal & £2.60 for a secondary meal. The
additional variance is the increased uptake of free school meals.
LEGAL & GOVERNANCE
Total 40
140 Projected shortfall against slippage
(15) Projected under spend on supplies & services
(85) Projected additional income across Legal & Governance
CUSTOMER & DIGITAL
Total 187
(10) Projected net under spend on staff costs
64 Projected over spend on supplies & services including printing & interpretor services
133 Projected shortfall due to increased Service Charges from Social Housing Providers that are not
covered by Housing Benefit Subsidy
STRATEGIC PLANNING, PEOPLE & PERFORMANCE
Total (44)
(44) Projected net under spend on staff costs, supplies & services and income.
PROJECTS & PROGRAMMES
Total 0 0 No material variances at present
FINANCE & BUSINESS SUPPORT Finance
Total (350) 17 Projected net overspend on staff costs, supplies & services and income.
Business Support
(367) Projected under spend on staff costs due to non-filling of vacancies in advance of delivering
2025/26 approved savings.
DIRECTORATE CORE COSTS
Total 20 20 Projected over spend on contribution to Tayside Valuation Joint Board
TOTAL 1,402
Page 40 of 132

Page 41

APPENDIX 3
Perth & Kinross Integration Joint Board (IJB)
Projected outturn based on Revenue Monitoring to 30 June 2024
Social Care Health
Health & Social
Care
Partnership
£'000 £'000 £'000
Sub Total - PKHSCP 4,647 3,488 8,135
Approved Use of General Reserves in 2024/25 (1,286) (158) (1,444)
Care at Home Transformation Funding (800) 0 (800)
Approved earmarked Reserves 2024/25 0 (884) (884)
Total Projected Outturn PKHSCP 2,561 2,446 5,007
Remaining General Reserves Available (2,561) (644) (3,205)
Projected Deficit (Month 3) 0 1,802 1,802
Projected Out-turn Over / (Under) Spend
5
Page 41 of 132

Page 42

Page 42 of 132

Page 43

APPENDIX 4
Revenue Grants
Education & Learning
Ukrainian children £511,000
Education Recovery £90,000
Early Years 1140 hours £393,000
Early Years Milk and Snack £115,000
Other Grants £255,000
Children, Families & Justice
Whole Family Wellbeing £1,114,000
Care Experienced Children and Young People £156,000
Other Grants £30,000
Economy, Development & Planning
UK Shared Prosperity Fund £1,282,000
Place Based Investment Programme £455,000
NOLB Employability £741,000
Other Grants £192,000
Environment & Infrastructure
Residential Cycle Storage & Parking Fund £143,000
Other Grants £3,000
Housing & Communities
Homes for Ukraine £950,000
Ukraine Resettlement £756,000
Community Resilience £157,000
Other Grants £346,000
Property Services
Other Grants £5,000
Health & Social Care
Other Grants £138,000
TOTAL £7,832,000
5
Page 43 of 132

Page 44

Page 44 of 132

Page 45

APPENDIX 5
PERTH & KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2024/25 PROJECTED OUTTURN
(Based on expenditure to 30 June 2024)
£'000
93 Housing Repairs
Projected over spend on energy costs (£40,000) and transport costs (£53,000)
(50) Administration
Projected slippage across HRA in excess of slippage target.
(250) Income
Projected increased income for Interest on Revenue Balances.
207 Capital Financed from Current Revenue
As a result of the projected net under spends highlighted above, this is the increase in the amount available to invest in the HRA
capital programme from the Revenue Budget.
0
Summary of Service Variances
5
Page 45 of 132

Page 46

Page 46 of 132

Page 47

APPENDIX 6
Other Grant Funding
Education & Learning
Scottish Government – Scottish Milk and Healthy Snack Scheme £376,430
Children, Families & Justice
Scottish Government - Justice Social Work Post Pandemic Recovery Work £311,396
Gannochy Trust – Universal Youth Service Partnership £173,651
Economy, Development & Planning
UK Government – UK Shared Prosperity Fund £3,356,783
Scottish Government – No One Left Behind 24-25 £1,843,000
Scottish Government – Delivery of Rural Community Led Local Development Funding 24-
25 £457,250
Scottish Government – Heat Network Support Unit £100,000
Innovate UK – Pathfinder Net Zero Living £53,314
Environment & Infrastructure
Bus, Accessibility & Active Travel – Direct Resource Grant £120,404
Housing & Communities
UK Government – Homes for Ukraine £242,200
Scottish Government – Local Air Quality Management £108,295
Scottish Government – Air Quality Resource Grant £83,003
TOTAL £7,225,726
5
Page 47 of 132

Page 48

Page 48 of 132

Page 49

Appendix 7
General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments
31/3/24 24/25 25/26 26/27 24/25 Future Balance
£m £m £m £m £m £m £m £m
General Fund Balance 83.793
Balances Held Under Statute / Regulation
- Service Concessions (17.262) 7.000 10.262 0.000
- Revenue Grants (17.337) 0.100 7.832 (9.405)
- Council Tax Income for affordable housing (5.609) 0.157 (0.283) (0.283) 0.048 (5.970)
- Developers Contributions: Affordable Housing (5.237) (5.237)
- Car Parking (1.532) 0.120 0.030 (1.382)
- Developers Contributions: Commuted Sums (1.218) (1.218)
- Devolved School Management (0.501) 0.239 0.262 0.000
Sub total (48.696) 7.616 (0.283) (0.283) 8.142 0.000 10.292 (23.212)
Balances Held for Specific (Previously Approved) Purposes
- Services for Children, Young People & Families (0.281) 0.281 0.000
- School Estate (2.164) 1.589 0.313 (0.262)
- Culture (0.857) 0.370 0.191 0.025 (0.271)
- School Counsellors (0.329) 0.227 0.102 0.000
- Works Maintenance (0.200) (0.200)
- Modern Apprentice Scheme (0.367) 0.340 0.027 0.000
- Project Feasibility Fund (Covid-19) (0.081) 0.040 (0.041)
- Cemetery Walls (0.262) 0.076 0.076 0.074 0.036 0.000
- PH20 (0.062) 0.062 0.000
- Working Smarter (Covid-19) (0.115) 0.115 0.000
- Community Resilience (0.175) 0.039 (0.136)
- Climate Change (0.205) 0.110 (0.095)
- Ventilation Measures (0.076) 0.076 0.000
- Salix (0.102) 0.102 0.000
Approved
Contributions from / (to)
Reserves
5
Page 49 of 132

Page 50

Appendix 7
General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments
31/3/24 24/25 25/26 26/27 24/25 Future Balance
£m £m £m £m £m £m £m £m
Approved
Contributions from / (to)
Reserves
- Local Area Partnerships (0.046) 0.046 0.000
- Community Investment Fund (0.087) 0.087 0.000
- Local Government Elections (0.053) (0.053) (0.053) (0.053) 0.212 0.000
- Financial Assistance (Mod) (0.020) (0.020) (0.020) (0.020) (0.080)
- Council Approved Expenditure (1.635) 1.127 0.059 0.129 (0.320)
- Feasibility 0.000 (0.100) (0.100) (0.100) (0.300)
Sub total (7.117) 4.062 0.005 (0.173) 0.775 0.000 0.743 (1.705)
Balances Held for Other Purposes 0.000
- Transformation & Workforce Management (7.606) 1.538 0.860 0.953 (4.255)
- Anti - Poverty (1.664) 0.575 0.235 0.300 0.070 (0.484)
Sub total (9.270) 2.113 1.095 0.000 1.253 0.000 0.070 (4.739)
Earmarked Reserves (65.083) 13.791 0.817 (0.456) 10.170 0.000 11.105 (29.656)
Uncommitted General Fund Balance 18.710
Use of unearmarked Reserves in setting Budgets (2.249)
(25/26 £(0.503m); 26/27 £2.476m
Impact of Current Year Projected Outturn (1.608)
Impact of Current Year Decisions (0.080)
Updated Uncommitted General Fund Balance 14.773
Percentage of Net Revenue Budget 3.2%
Page 50 of 132

Page 51

APPENDIX 8
Council Approved Projects - 2024/25
Housing & Communities
Intensive Housing Support £70,000
Total £70,000
5
Page 51 of 132

Page 52

Page 52 of 132

Page 53

Appendix 9
FINANCIAL RISKS
Risk to Revenue Budget Mitigation
1 Achievement of staff slippage targets, particularly
relating to teacher numbers and impact on pupil /
teacher ratio
- Proactive workforce
management
- Revenue monitoring
- Future budget submissions
2 Ceasing of additional Financial Insecurity Funding
on 31 March 2024.
- Proactive management
- Revenue monitoring
- Future budget submissions
3 Current year pay awards - Revenue monitoring
- Future budget submissions
4 Support for Tayside Contracts - Tayside Contracts
Governance & Strategy Group
- Revenue monitoring
- Future budget submissions
5 Funding - Pupil Teacher Ratio
- Liason with COSLA
5
Page 53 of 132

Page 54

Page 54 of 132

Page 55

PERTH & KINROSS COUNCIL 
Finance & Resources Committee 
18 September 2024 
COMPOSITE CAPITAL BUDGET 2024/30 & HOUSING INVESTMENT
PROGRAMME 2024/29 – MONITORING REPORT No.1 
Report by Chief Finance Officer
(Report No. 24/261) 
1. PURPOSE 
1.1 This report provides a summary position to date for the 6-year Composite
Capital Budget for 2024/25 to 2029/30 and the 5-year Housing Investment
Programme for 2024/25 to 2028/29 and seeks approval for adjustments to the
programmes. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
(i) notes the contents of the report.
(ii) approves the proposed adjustments to the six-year Composite Capital
Budget 2024/25 to 2029/30 set out in Sections 5 and 6 of the report
and summarised in Appendices I and II.
(iii) approves the proposed adjustments to the Housing Investment
Programme Budget 2024/25 to 2028/29 set out in Section 7 of the
report and summarised in Appendix III.
(iv) notes progress with the delivery of major Capital projects as
summarised in Appendix IV. 
3. STRUCTURE 
3.1 The report is structured over the following sections: 
• Section 4: Background / Main Issues
• Section 5: Composite Capital Programme – Gross Capital Resources
• Section 6: Composite Capital Programme – Expenditure
• Section 7: Housing Investment Programme
• Section 8: Summary 
4. BACKGROUND / MAIN ISSUES 
4.1 At its meeting on 28 February 2024, the Council approved a revised
Composite Capital Budget for the 6 years 2024/25 to 2029/30 (Report 24/64
refers). This Committee subsequently approved a revised budget at its
meeting on 24 April 2024 (Report 24/131 refers) for the years to 2027/28. This
monitoring report now incorporates the approved Composite Capital Budgets
for 2028/29 and 2029/30, and the total gross budget approved for the 6 years
6
Page 55 of 132

Page 56

from 2024/25 totalled £591.848 million. This report also incorporates the
Housing Investment Programme for 2028/29 approved by the Housing and
Social Wellbeing Committee on 24 January 2024 (Report 24/24 refers), giving
a total gross budget for 2024/25 to 2028/29 of £97.0 million. 
4.2 This report advises on expenditure to 31 July 2024, and the latest estimate of
the projected outturn for each of the years to 2029/30 for the Composite
Programme and 2028/29 for the Housing Investment Programme. 
5. COMPOSITE CAPITAL PROGRAMME – GROSS CAPITAL RESOURCES 
5.1 As a result of the latest monitoring exercise, further adjustments to the budget
are proposed. The current estimated total gross capital resources (which
includes movements in Capital Receipts, Capital Grants, Contributions and
borrowing) available over the six years 2024/25 to 2029/30 amount to
£619.172 million. 
5.2 Movements from the revised Composite Capital Budget approved on 24 April
2024 for the six years are summarised in the table below, and the constituent
elements for each year are shown in Appendix I. 
Total Gross Composite Capital Resources 
Approved 
24 April 2024
Current
Estimate
Movement 
£m £m £m
2024/25 201.068 174.999 (26.069)
2025/26 90.913 113.301 22.388
2026/27 106.406 134.107 27.701
2027/28 122.414 84.890 (37.524)
2028/29 37.039 64.097 27.058
2029/30 34.008 47.778 13.770
Total 591.848 619.172 27.324  
5.3 The above movements can be summarised as follows: 
B/f from
2023/24
Current
Monitoring
Total 
£m £m £m
Increase in Grants (Section 5.4) 2.341 0.727 3.068
Increase/(Reduction) in Receipts (Section
5.5)
(0.594) 0.029 (0.565)
Increase in Receipts carried forward to future
years (Section 5.5)
0.230 0.000 0.230
Increase in Revenue, Third Party, Developers
& Tay Cities Contributions (Section 5.6) 
1.389 0.347 1.736
Increase in Borrowing Requirement (Section
5.7 and 5.8)
8.509 14.346 22.855
Increase in Gross Capital Resources
(Section 5.2)
11.875 15.449 27.324 
5.4 Within the table above, £11.875 million of the total increase of £27.324
million was budgeted in 2023/24 but was not applied and has therefore been
Page 56 of 132

Page 57

carried forward and is available in the current 6-year programme. The
increase in Gross Capital Resources in respect of the current monitoring
exercise is £15.449 million and is detailed in the following sections. 
5.5 There has been some movements in Capital Grants across the 6-year
programme which are summarised below: 
• The ring-fenced grant for Cycling Walking & Safer Streets Grant has
been removed by the Scottish Government and replaced with Active
Travel Grant as part of the General Capital Grant. The Council has
been allocated £739,000 in 2024/25, and it has been assumed that this
will continue in future years, with £600,000 each year assumed at this
stage. It is proposed that these are added to the General Capital Grant
along with corresponding expenditure budgets, and these have been
included in Appendix II. 
• The General Capital Grant settlement for 2024/25 also includes
£175,000 for Nature Restoration, and it is also proposed to allocate this
to a corresponding expenditure budget. 
•  The General Capital Grant allocation for 2026/27 for flooding has been
increased by £647,000 in line with the increased grant for the Comrie
Flood Protection Scheme (section 6.2.4). 
• The final amount of General Capital Grant in 2023/24 was £1.859
million lower than budgeted, relating to Free School Meals. Further,
the final settlement for 2024/25 was £111,000 lower than originally
expected. In total, these have reduced the grant available in current 6-
year programme by £1.97 million. 
5.6 General Fund receipts of £685,000 which had been expected to conclude in
2024/25 were received in 2023/24, which reduces the receipts now
anticipated to be received in 2024/25. In addition, revised estimates of future
receipts have increased the overall total by £30,000 over the programme.
There were similar small movements in Commercial Property and Ring-
Fenced between 2023/24 and the current programme. Further, with reduced
expenditure on the Commercial Property Investment Programme, there is an
increase of £230,000 in receipts carried forward to future years. 
5.7 Movements in Revenue, Third Party and Tay Cities Deal Contributions mostly
relate to brought-forward adjustments between amounts received in 2023/24
and 2024/25. 
5.8 The projected borrowing requirement in 2024/25, which is effectively the
balancing item for resources, is £141.318 million. This is £28.605 million
lower than the borrowing requirement approved by this Committee on 24 April
2024. 
5.9 The total borrowing requirement in the subsequent years 2025/26 to 2029/30
has increased by £51.460 million to £343.482 million, resulting in an overall
increase of £22.855 million in the total level of borrowing across the whole 6-
Page 57 of 132

Page 58

year programme. As shown in the table at Section 5.3, of this total, £8.509
million relates to borrowing brought forward from 2023/24, leaving £14.346
million relating to new borrowing. This new borrowing is summarised as
follows: 
2024/25 2025/26 2026/27 Later
Years
Total 
£m £m £m £m £m
Reduction in Capital Grants
(Section 5.4)
1.970 0 0 0 1.970
Increase in General Fund Capital
Receipts (Section 5.5)
(0.030) 0 0 0 (0.030)
Increase in Borrowing on Comrie
Flood Protection Scheme (Section
6.2.4)
0 0 0.162 0 0.162
Reduction in Prudential Borrowing
(net) – Environment &
Infrastructure (Section 6.2.6)
(0.003) 0 0 0 (0.003)
Reduction in Prudential Borrowing
(net) – Housing & Communities
(Appendix II)
(0.003) 0 0 0 (0.003)
Increase in Prudential Borrowing
on Property Service Management
(Section 6.4.6)
0 12.250 0 0 12.250
Movements arising from re-
phasing of expenditure and
receipts (Appendix II)
(39.048) 9.951 26.743 2.354 0.000
Increase/(Reduction) in
Borrowing Requirement
(37.114) 22.201 26.905 2.354 14.346 
5.10 The chart below shows the Capital Resources required to fund the 2024/25
Composite Capital Programme following the proposed budget adjustments
detailed in this report. 
80.8%
14.4%
0.5%
2.1%
0.6%
1.6%
4.9%
Projected Capital Resources 2024/25
(August 2024)
Borrowing (£141.318M)
Grants (£25.163M)
Tay City Deal (£0.950M)
Developer Contributions (£3.707M)
Third Party & Revenue Contributions (£1.101M)
Receipts (£2.760M)
£Million
Page 58 of 132

Page 59

6. COMPOSITE CAPITAL PROGRAMME – EXPENDITURE 
6.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme 
6.1.1 Total expenditure (net of grants and contributions) to 31 July 2024 on the
Composite Capital Programme is detailed in Appendix II and summarised as
follows: 
Projected
Outturn (£m)
Net
Expenditure
to 31 July
2024 (£m)
% of
Projected
Outturn    
Environment & Infrastructure  37.485 8.845 24%
Housing & Communities 2.852 0.072 3%
Economy, Development & Planning 54.439    12.426 23%
Property Services 68.197 19.313 28%
Customer & Digital Services 8.038 0.634 8%
Health & Social Care 0.962 0.202 21%
Total Net Capital Expenditure 171.973 41.492 24% 
6.2 Environment & Infrastructure 
6.2.1 The Strategic Lead has reviewed the programme for Environment &
Infrastructure and proposed various budget adjustments, the most significant
of which are described below. 
6.2.2 Following closure of the previous year accounts, various adjustments are
proposed to align to actual income and expenditure as follows: 
- School Road Safety Measures – following additional income from Scottish
Government and Tactran in 2023/24 of £110,000, the expenditure budget
in the current year has been increased.
- Car Parking Investment – the actual costs for Car Parking Investment in
the previous year were £43,000 higher than anticipated and this has been
funded by an additional revenue contribution from the Car Park Trading
Account.
- Almondbank Flood Protection Scheme – the project has been completed
with the final cost for 2023/24 being £183,000 greater than budget, which
has been met by a Revenue Contribution. 
6.2.3 Within Traffic & Road Safety, confirmation has been received from the
Scottish Government that Cycling Walking and Safer Routes (CWSR) is to be
replaced by a new Active Travel Grant. Appendix II has been updated to
reflect this change with the removal of the remaining budget for CWSR and
the incorporation of Active Travel Grant of £739,000 in the current year and
an estimated £600,000 in each future year, which is included with the General
Capital Grant estimates. In addition, Car Parking Investment in Pitlochry is
scheduled to progress this year with an estimated cost increase of £55,000
which will be met by a Revenue Contribution from the Car Park Trading
Account. 
Page 59 of 132

Page 60

6.2.4 Within Rural Flooding, following completion of the tender exercise for the
works, the anticipated costs of the Comrie Flood Scheme Project have
increased by £809,000. The Scottish Government have confirmed grant
funding of 80% towards this increase in costs, contributing an additional
£647,000. In order for the Council to meet its share of the cost increase, it is
proposed that borrowing is increased by £162,000. The increased cost and
additional grant have been added to the budget in 2026/27. 
6.2.5 The following rephasings of budgets are also proposed:  
Project 2024/25
£m
2025/26
£m
Later
Years
£m
Description
Structural
Maintenance
1.000 (0.200) (0.800) Acceleration of £1m into the current year,
spread equally from future years, to progress
works on Stuart Tower Road. 
Bridge Refurbishment
Programme
(0.337) 0.337 0.000 Moved from the current year to next due to
resourcing issues within the team.
Old Perth Bridge 0.059 0.059 0.000 Acceleration of budget to match anticipated
spend on the initial strengthening works. 
A977 Upgrades (0.177) 0.177 0.000 Following previous upgrades to the A977, the
remaining budget was previously earmarked
for junction realignment. It has been
determined this is unlikely to improve the
safety of the road, and as such,
investigations are underway to assess other
road safety measures likely to have a greater
impact.
Flood Mitigation
Measures – Dunkeld
and Craigie Burn
(0.992) 0.072 0.920 When approved in February 2024, the £1m
budget for Dunkeld and Cragie Burn Flood
Mitigation was allocated to 2024/25. The
rephasing in this report aligns the budget to
the anticipated timeframe in which the work
can be undertaken. 
6.2.6 In addition, within Environment & Infrastructure, as detailed in section 5.4 the
General Capital Grant includes an amount of £175,000 towards Nature
Restoration which has been reflected in the budget for the current year. There
is also a small adjustment relating to Smart City Waste under Prudential
Borrowing relating to completion of the programme last year, resulting in a
reduction in borrowing in the current year of £3,000. 
6.2.7 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I & II. 
6.3 Economy, Development & Planning 
6.3.1 The Strategic Lead has reviewed the programme for Economy, Development
& Planning and proposed the following budget adjustment. 
6.3.2 Within Other Planning Projects, the expenditure likely to be incurred in the
current year on the Perth Eco-Innovation Park is for design works only.
Accordingly, it is proposed that £23.020 million is rephased from 2024/25,
Page 60 of 132

Page 61

with £720,000 allocated to next year and £22.300 million to 2026/27. This
adjustment has been reflected in Appendix II. 
6.4 Property Services 
6.4.1 Within Project Support, following completion of the projects at Breadalbane
Academy and Letham Primary, it is proposed the remaining total budgets
totalling £60,000 are returned to Investment in the Learning Estate (IILE). In
addition, it is proposed that the IILE budget is updated as follows: 
Project 2024/25
£m
2025/26
£m
Later
Years
£m
Virement
£m
Description
Investment in
Learning Estate
(IILE)
(8.500) 4.500 0.000 (4.000) Transfer of £4m to Methven Primary
Refurbishment and moving £4.5m of
the budget to next year on IILE
Methven Primary
Refurbishment
0.200 3.500 0.300 4.000 Draw down of funding from
Investment in Learning Estate
towards the new gym hall and dining
facilities at Methven Primary School. 
6.4.2 Also within Project Support the following rephasings are proposed: 
Project 2024/25
£m
2025/26
£m
Later
Years
£m
Description
Perth Grammar School –
Upgrade Programme 
(0.984) 0.000 0.984 Limited upgrades are planned for
the remainder of the current year,
and with sufficient budget for
works planned next year, it is
proposed £984,000 of the budget
is slipped into 2026/27.
Perth High School – New
School Investment
4.000 (4.000) 0.000 With works progressing at pace
on site, a revised profile has been
provided by the contractor for the
level of works to be completed
this financial year. In line with the
reprofiling of spend it is proposed
£4m is accelerated from next
year.
Blairgowrie Recreation Centre
- Replacement
2.700 (2.700) 0.000 Phase 1 of the project is on
course for completion this
calendar year and in line with the
anticipated spend profile for the
remainder of the financial year it
is proposed £2.7m is accelerated
from next year. 
Technology Upgrades (1.119) 0.559 0.560 Difficulties have been
encountered in gaining access to
schools whilst maintaining the
learning environment to carry out
Technology Upgrades. Due to this
and the limited accessibility
potential for the remainder of the
financial year, it is proposed that
the remaining budget is moved
equally to next year and 2026/27. 
Page 61 of 132

Page 62

6.4.3 This Committee has previously approved the extension and redevelopment of
Pitlochry High School gym and games hall facilities at an estimated cost of
£8.7 million at its meeting on 12 June 2024 (Report 24/186 refers), to be
funded from the reprioritisation of the existing Investment in Learning
Programme. The detailed programme of works is currently being developed,
and reprofiling of the budget for the project will be incorporated into the next
monitoring report to this committee in November 2024. 
6.4.4 Within Projects & Contracts, feasibility work is ongoing for the Free School
Meal Expansion Programme with no capital expenditure expected in the
current year. It is therefore proposed that the budget is rephased, with £1
million to next year and £2.135 million to 2026/27. 
6.4.5 Within Property Service Management, following the completion of building
condition surveys, it is proposed that £250,000 is accelerated from 2027/28
on the Property Compliance Works Programme in line with planned
compliance works to be completed in the current year. Following the
acceleration of the Property Compliance budget last year to allow initial works
on the Friarton Depot Waste Transfer Station to be progressed at that time, it
is now proposed that the cost of these works of £219,000 is reinstated from
the Friarton Depot Waste Transfer Station budget to Property Compliance in
the current year. It is also proposed to rephase a further £1.781 million to
2025/26 on the Friarton Depot project as the programme of works is
developed. In addition, it is proposed to move £2.795 million for Perth Art
Gallery to 2025/26 with only limited expenditure anticipated for this year. 
6.4.6 At its meeting on 4 September 2024 (Report 24/242 refers) the Council
approved various actions under the Perth City Integrated Investment
Proposal. This included the purchase of Pullar House and Kinnoull Street Car
Park at the end of the PFI Agreement in September 2025 to be funded by
Prudential Borrowing. These have now been included in the Capital Budget at
Appendix II within the Property Service Management programme. 
6.4.7 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I & II. 
6.5 Customer & Digital Services 
6.5.1 Within Customer & Digital Services, the requirement for a replacement Legal
Case Management system has been identified due to the age of the current
system and the risks associated with its failure. It is proposed that £80,000 is
vired from the ICT Infrastructure Replacement and Upgrade Programme
towards this project. 
6.5.2 Additionally within Customer and Digital Services, the following rephasings
are proposed: 
Page 62 of 132

Page 63

Project 2024/25
£m
2025/26
£m
Later
Years
£m
Description
ICT Infrastructure
Replacement & Upgrade
Programme
(1.789) 0.485 1.304 Budget rephased. Microsoft licence
negotiations for 2024 were delayed
nationally, allowing PKC renewal
costs to be kept at 2021 prices.
However future year increases will
likely be higher.
Data & Analytics  (0.260) 0.260 0.000 Anticipated spend to be £260,000
less than budget in the current year. It
is therefore proposed the balance is
transferred to next year. 
Supporting Digital (0.248) 0.248 0.000 Anticipated spend to be £248,000
less than budget in the current year. It
is therefore proposed the balance is
transferred to next year.
Mosaic – Swift Social
Work System
Replacement 
Revenue Contribution
(0.095) 
0.009
0.084 
0.002
(0.011) 
0.011
Implementation of Mosaic Social
Work System is ongoing and the
budget rephasing aligns with works
required as the rollout progresses. 
There have also been minor
reductions in the Revenue
Contributions available on the project. 
6.5.3 All the above proposed adjustments have been reflected in Appendices I &
II. 
6.6 Health & Social Care 
6.6.1 Within Technology Enabled Telecare, the number of peripheral devices
required to be replaced are less than initially anticipated as some existing
devices are compatible with the new digital service. Economies of scale have
also been realised due to bulk purchasing. Therefore, it is proposed that £1
million is rephased to 2028/29, to reflect the current expenditure profile. 
6.6.2 The budgets for Developing Supported Tenancies and Moving & Handling
Office Refurbishment are not expected to be progressed in the current year
and it therefore proposed that the budgets are moved to next year. 
6.6.3 All the above proposed adjustments, together with other small movements,
have been reflected in Appendix II. 
7. HOUSING INVESTMENT PROGRAMME 
7.1  The total current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2024/25 to 2028/29 amounts to
£96.917 million. This has reduced by £83,000 from the approved revised
Housing Investment Programme by this Committee on 24 April 2024. This
reduction relates entirely to increased expenditure in 2023/24, which reduces
expenditure in the current programme by a corresponding amount.
Movements from the previous estimates are summarised in the table below
and detailed in Appendix III. 
Page 63 of 132

Page 64

Approved 
24 April 2024
Current
Estimate
Movement 
£m £m £m
2024/25 21.536 27.818 6.282
2025/26        19.942       20.256 0.314
2026/27 15.633 15.633 0.000
2027/28 19.845 19.845 0.000
2028/29 20.044  13.365  (6.679)
Total 97.000 96.917 (0.083) 
Total Expenditure to 31 July 2024 (Housing Investment Programme) 
7.2 Net expenditure for 2024/25 to 31 July 2024 amounts to £7.679 million and
receipts amount to £5,000. Therefore, the borrowing requirement for the year
to date is £7.674 million. 
7.3 The Strategic Leads for Housing & Communities and Property Services have
reviewed the Housing Investment Programme and proposed the budget
adjustments outlined below.
7.4 There are several small adjustments on the House New Build Programme
reflecting schemes that were completed in 2023/24, which amount to an
overall net reduction of £12,000. These adjustments include the purchase of
Beechgrove and Balhousie Primary School by the HRA in March 2024, both
using Scottish Government grant received. Scottish Government Grant of £1.4
million has also been awarded for Council House Buy-Backs in 2024/25 and,
after adjusting for the £35,000 difference from 2023/24, it is proposed to
increase the budget for purchases in 2024/25 by this amount. In addition,
£90,000 of grant has been awarded for Mortgage-to Rent programme, and
this budget has also been increased by this amount.
7.5 It is proposed to allocate some of the SHQS Future Developments Budget in
2028/29 to current schemes, as follows: 
• Triple Glazing - £967,000 in 2024/25 for the new window replacement
programme, including additional properties added to the current contract
that were unable to be progressed previously.
• External Fabric - £941,000 in 2024/25 for start of the new contract. A
further £259,000 is proposed to be accelerated from the 2025/26 External
Fabric budget, as well as a further £142,000 of private owner recharges.
• Bathroom Upgrades - £1.250 million in 2024/25, based on current
estimated demand and requirements.
• Environmental Improvements - £245,000 in 2024/25 for additional works
at Pullar Terrace as well as drainage works at different sites.
• Rannoch Road Regeneration - £144,000 in 2024/25 for the installation of
a new walkway.
• Controlled Door Entry - £21,000 in 2024/25 to meet costs of additional
security requests. This amount is enhanced by a further £5,000 of
recharges to private owners.
Page 64 of 132

Page 65

• Double Dykes Chalet Replacements - £2.538 million in 2024/25 and
£573,000 in 2025/26. These works are enhanced by a further £3.426
million of Scottish Government grant allocated to the works in 2024/25. 
7.6 There are various other small adjustments to various programmes reflecting
differences in expenditure brought forward from 2023/24 amounting to a net
£147,000. It is proposed that all such amounts are transferred to the General
Capital Works Budget in 2024/25. The only significant movement included
within this is a £120,000 saving in the Fire Precautions budget on completion
of the smoke alarm contract. 
7.7 There have also been small land disposals totalling £5,000 in the current year
to date. After allowing for the £83,000 reduction brought forward from
2023/24, the borrowing requirement has therefore reduced by an overall
£88,000 for the current programme. 
8. BUDGET OVERVIEW 
8.1 The projected net expenditure outturn in 2024/25 for the Composite Capital
Budget is £171.973 million and represents 87% of the original 2024/25
budget approved on 24 April 2024 (£198.184 million). The revised budget is
based on the latest projections of expenditure and all budget adjustments
outlined within this report. 
8.2 Net expenditure to 31 July 2024 on the Composite Capital Budget is £41.492
million and represents 24% of the proposed revised budget for 2024/25 of
£171.973 million. 
8.3 The projected net expenditure outturn in 2024/25 for the Housing Investment
Programme is £27.818 million and represents 129% of the original 2024/25
budget approved on 26 April 2024 (£21.536 million). This increase reflects the
allocation of future years block budgets to specific projects in 2024/25 as well
as the inclusion of expenditure proposed at Double Dykes following the award
of Scottish Government grant 
8.4 Net expenditure to 31 July 2024 on the Housing Investment Programme is
£7.679 million which represents 28% of the proposed revised budget for
2024/25 of £27.818 million. 
8.5 The Council’s total Borrowing Requirement to 31 July 2024, based on the
Composite and Housing Investment Programmes, is £37.831 million. The
estimated overall Council Borrowing Requirement for 2024/25 as a whole has
reduced by £22.328 million to £167.298 million as a result of the monitoring
adjustments reflected within this report. This reflects a reduction in estimated
borrowing on the Composite Programme of £28.605 million, and an increase
on the Housing Investment Programme of £6.277 million. These amounts
included borrowing carried forward from last year. 
8.6 In the context of the Capital Budget, the borrowing above refers specifically to
the funding of capital expenditure and therefore the need to borrow. The
actual amounts and timing of the borrowing is undertaken as part of the
Page 65 of 132

Page 66

Council’s Treasury Management operations and reported within the Treasury
Activity and Compliance reports throughout the year. 
Author(s)
Name  Designation Contact Details
John Jennings Senior Accountant CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date
Scott Walker Chief Finance Officer 9 September 2024 
Page 66 of 132

Page 67

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 67 of 132

Page 68

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Chief Executive and the Executive Directors have been consulted in the
preparation of this report.   
Page 68 of 132

Page 69

2. BACKGROUND PAPERS 
No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix I – Composite Capital Programme - Estimated Capital Resources
2024/25 to 2029/30
Appendix II – Composite Capital Programme - Summary of Capital Resources
and Expenditure 2024/25 to 2029/30        
Appendix III – HRA Capital Investment Programme – Summary of Capital
Resources and Expenditure 2024/25 to 2029/30 
Appendix IV – Significant Capital Projects Progress Update
Page 69 of 132

Page 70

Page 70 of 132

Page 71

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2024/25 to 2029/30
APPENDIX I
Capital Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources Resources
2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
Capital Grants
Cycling, Walking & Safer Routes (CWSR) 0 0 0 0 0 0 0
Recycling Improvement Fund 386 0 0 0 0 0 386
Cross Tay Link Road - Transport Scotland 0 0 0 0 0 0 0
Inspiring School Age Childcare Spaces 0 0 0 0 0 0 0
Gypsy Travellers Improvements 0 0 0 0 0 0 0
General Capital Grant 24,777 13,239 19,255 12,750 12,750 12,750 95,521
Total Capital Grants 25,163 13,239 19,255 12,750 12,750 12,750 95,907
General Capital Receipts
General Fund - Capital Receipts 476 444 0 0 0 0 920
General Fund - Ring Fenced Receipts 589 352 902 1,047 950 980 4,820
Total General Capital Receipts 1,065 796 902 1,047 950 980 5,740
Commercial Property Receipts
Capital Receipts brought-forward 2,102 1,120 1,550 1,550 2,638 2,638 2,102
Commercial Property Capital Receipts 713 430 0 1,088 0 0 2,231
Capital Receipts carried-forward (1,120) (1,550) (1,550) (2,638) (2,638) (2,638) (2,638)
Total Commercial Property Receipts Applied 1,695 0 0 0 0 0 1,695
Contributions
Tay Cities Deal 950 550 505 2,946 500 956 6,407
Developer Contributions 3,707 2,367 2,600 2,600 2,500 2,500 16,274
Other Third Party Contributions 1,001 0 2,000 3,000 1,000 1,000 8,001
Revenue Budget Contributions 100 124 124 0 0 0 348
Total Contributions 5,758 3,041 5,229 8,546 4,000 4,456 31,030
Capital Borrowing Requirement 141,318 96,225 108,721 62,547 46,397 29,592 484,800
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 174,999 113,301 134,107 84,890 64,097 47,778 619,172
6
Page 71 of 132

Page 72

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2024/25 to 2029/30
APPENDIX I
Movements in Resources from Approved Budget - 24 April 2024
Resources Revised Revised Revised Revised Revised Revised Revised
b/f - 2023/24 Budget Budget Budget Budget Budget Budget Budget
to 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Increase/(Decrease) in:
Capital Receipts - General Fund (685) 742 (212) (250) (250) 0 0 (655)
Capital Receipts - Commercial Property 1 0 0 0 0 0 0 1
Capital Receipts - Ring Fenced 90 (1) 0 0 0 0 0 89
Capital Grants:
Cycling, Walking & Safer Routes (CWSR) 200 (864) (200) (200) (200) (200) (200) (1,664)
Recycling Improvement Fund 386 0 0 0 0 0 0 386
Cross Tay Link Road - Transport Scotland 0 0 0 0 0 0 0 0
Inspiring School Age Childcare Spaces 0 0 0 0 0 0 0 0
Gypsy Travellers Improvements 0 0 0 0 0 0 0 0
General Capital Grant 1,755 (1,056) 600 1,247 600 600 600 4,346
Tay Cities Deal (49) 0 0 0 0 0 0 (49)
Third Party Contributions 258 72 0 0 0 0 0 330
Revenue Contributions (227) 277 (1) (1) 0 0 0 48
Developer Contributions 1,407 0 0 0 0 0 0 1,407
Resources b/f 0 230 0 0 0 0 0 230
Resources c/f to future years 230 (230) 0 0 0 0 0 0
Borrowing Requirement 8,509 (37,114) 22,201 26,905 (37,674) 26,658 13,370 22,855
Total Increase/(Decrease) in Resources 11,875 (37,944) 22,388 27,701 (37,524) 27,058 13,770 27,324
Approved Resources 24 April & 28 February 2024 201,068 90,913 106,406 122,414 37,039 34,008 591,848
Revised Resources 174,999 113,301 134,107 84,890 64,097 47,778 619,172
Page 72 of 132

Page 73

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Approved Actual Proposed Approved Proposed Proposed Revised Actuals Projected Approved Proposed Revised Approved Proposed Revised
Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
24-Apr-24 Forward 24-Apr-24 Forward Adjustment 31-Jul-24 24-Apr-24 Adjustment 24-Apr-24 Adjustment
to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2023/24 2024/25 2024/25 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2025/26 2025/26 2026/27 2026/27 2026/27
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE 21,683 20,295 1,388 35,641 1,388 456 37,485 8,845 37,485 36,636 935 37,571 38,449 1,257 39,706
HOUSING & COMMUNITIES 543 490 53 2,802 53 (3) 2,852 72 2,852 3,230 0 3,230 1,273 0 1,273
ECONOMY, DEVELOPMENT & PLANNING 44,352 40,336 4,016 73,443 4,016 (23,020) 54,439 12,426 54,439 10,817 720 11,537 6,945 22,300 29,245
PROPERTY SERVICES 63,245 57,720 5,525 73,942 5,525 (11,270) 68,197 19,313 68,197 32,444 19,657 52,101 49,704 4,113 53,817
CUSTOMER & DIGITAL SERVICES 5,681 5,430 251 10,170 251 (2,383) 8,038 634 8,038 5,168 1,019 6,187 4,913 232 5,145
HEALTH & SOCIAL CARE 1,053 1,069 (16) 2,186 (16) (1,208) 962 202 962 1,391 258 1,649 1,390 0 1,390
TOTAL NET EXPENDITURE 136,557 125,340 11,217 198,184 11,217 (37,428) 171,973 41,492 171,973 89,686 22,589 112,275 102,674 27,902 130,576
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (22,699) (20,944) (1,755) (24,078) (1,755) 1,056 (24,777) (9,436) (24,777) (12,639) (600) (13,239) (18,008) (1,247) (19,255)
DEVELOPER CONTRIBUTIONS (2,847) (1,440) (1,407) (2,300) (1,407) 0 (3,707) 0 (3,707) (2,367) 0 (2,367) (2,600) 0 (2,600)
CAPITAL RECEIPTS (801) (1,485) 684 (1,131) 684 (742) (1,189) (268) (1,189) (1,086) 212 (874) (250) 250 0
ANNUAL BORROWING REQUIREMENT 110,210 101,471 8,739 170,675 8,739 (37,114) 142,300 31,788 142,300 73,594 22,201 95,795 81,816 26,905 108,721
CAPITAL RECEIPTS BROUGHT FORWARD (2,245) (2,245) 0 (1,872) 0 (230) (2,102) (2,102) (2,102) (1,120) 0 (1,120) (1,550) 0 (1,550)
CAPITAL RECEIPTS CARRIED FORWARD 1,872 2,102 (230) 1,120 (230) 230 1,120 471 1,120 1,550 0 1,550 1,550 0 1,550
TOTAL NET BORROWING REQUIREMENT 109,837 101,328 8,509 169,923 8,509 (37,114) 141,318 30,157 141,318 74,024 22,201 96,225 81,816 26,905 108,721
6
Page 73 of 132

Page 74

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
ENVIRONMENT & INFRASTRUCTURE
HOUSING & COMMUNITIES
ECONOMY, DEVELOPMENT & PLANNING
PROPERTY SERVICES
CUSTOMER & DIGITAL SERVICES
HEALTH & SOCIAL CARE
TOTAL NET EXPENDITURE
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT
DEVELOPER CONTRIBUTIONS
CAPITAL RECEIPTS
ANNUAL BORROWING REQUIREMENT
CAPITAL RECEIPTS BROUGHT FORWARD
CAPITAL RECEIPTS CARRIED FORWARD
TOTAL NET BORROWING REQUIREMENT
Approved Proposed Revised Approved Proposed Revised Approved Proposed Revised Revised
Budget Budget Budget Budget Budget Budget Budget Budget Budget Budget
24-Apr-24 Adjustment 24-Apr-24 Adjustment 24-Apr-24 Adjustment
Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2027/28 2027/28 2027/28 2028/29 2028/29 2028/29 2029/30 2029/30 2029/30
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
20,295 460 20,755 16,580 895 17,475 16,580 717 17,297 170,289
1,419 0 1,419 1,500 0 1,500 1,500 0 1,500 11,774
(4,863) 0 (4,863) (2,150) 0 (2,150) (2,636) 0 (2,636) 85,572
86,617 (37,750) 48,867 10,000 25,000 35,000 10,000 12,500 22,500 280,482
10,447 (34) 10,413 8,139 363 8,502 5,108 803 5,911 44,196
1,306 0 1,306 320 1,000 1,320 320 (50) 270 6,897
115,221 (37,324) 77,897 34,389 27,258 61,647 30,872 13,970 44,842 599,210
(12,150) (600) (12,750) (12,150) (600) (12,750) (12,150) (600) (12,750) (95,521)
(2,600) 0 (2,600) (2,500) 0 (2,500) (2,500) 0 (2,500) (16,274)
(1,338) 250 (1,088) 0 0 0 0 0 0 (3,151)
99,133 (37,674) 61,459 19,739 26,658 46,397 16,222 13,370 29,592 484,264
(1,550) 0 (1,550) (2,638) 0 (2,638) (2,638) 0 (2,638) (2,102)
2,638 0 2,638 2,638 0 2,638 2,638 0 2,638 2,638
100,221 (37,674) 62,547 19,739 26,658 46,397 16,222 13,370 29,592 484,800
Page 74 of 132

Page 75

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
24-Apr-24 Forward 24-Apr-24 Forward Adjustment 18-Sep-24 31-Jul-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24
to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2023/24 2024/25 2024/25 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..) 34 27 7 328 7 335 335 362 362 361 400 400 2,220
Road Safety Initiatives - A94 Safety Improvements 0 0 84 0 84 84 0 0 0 0 0 84
Active Travel Grant -Traffic & Road Safety Schemes 0 0 0 0 739 739 185 739 600 600 600 600 600 3,739
Additional Road Safety - Pedestrian Crossings 0 0 153 0 153 153 153 153 0 0 0 459
Schools Road Safety Measures 488 476 12 0 12 110 122 26 122 0 0 0 0 0 122
Scottish Government Grant - CWSS 0 (92) 92 0 92 (92) 0 0 0 0 0 0 0 0
Third Party Contribution (TACTRAN) 0 (18) 18 0 18 (18) 0 0 0 0 0 0 0 0
20mph Signage Programme - Schools 10 1 9 119 9 128 128 0 0 0 0 0 128
20mph Signage Programme 76 37 39 0 39 39 13 39 0 0 0 0 0 39
Cycling Walking & Safer Routes (CWSR) 1,462 1,218 244 664 244 (908) 0 9 0 0 0 0 0 0 0
Scottish Government Grant - CWSR (1,312) (1,020) (292) (664) (292) 956 0 0 0 0 0 0 0 0
Third Party Contribution (TACTRAN) (150) (198) 48 0 48 (48) 0 0 0 0 0 0 0 0
Car Parking Investment 396 439 (43) 0 (43) 43 0 0 0 0 0 0 0 0
Revenue Contribution (105) (148) 43 0 43 (43) 0 0 0 0 0 0 0 0
Car Parking Investment - Pitlochry 0 0 150 0 55 205 77 205 0 0 0 0 0 205
Revenue Contribution 0 0 0 0 (55) (55) (55) 0 0 0 0 0 (55)
Sub-Total 899 722 177 834 177 739 1,750 310 1,750 1,115 1,115 961 1,000 1,000 6,941
Asset Management - Roads & Lighting
Structural Maintenance 11,368 11,884 (516) 10,420 (516) 1,007 10,911 4,737 10,911 9,298 9,506 7,300 9,800 9,800 56,615
Third Party Contribution (Forestry Commission Timber Routes) (390) (397) 7 0 7 (7) 0 0 0 0 0 0 0 0
Third Party Contribution (99) (94) (5) 0 (5) 5 0 0 0 0 0 0 0 0
Revenue Contribution 0 (5) 5 0 5 (5) 0 0 0 0 0 0 0 0
Traffic Signal Renewals - Upgrading 4 4 169 4 173 173 100 100 100 100 100 673
Footways 655 630 25 390 25 415 337 415 390 390 393 410 410 2,408
Street Lighting 0 0 0 0 0 0 0 0 0 600 600 1,200
Investment in Local Footpaths 0 40 (40) 0 (40) 40 0 0 20 100 0 0 0 120
Road Safety Barriers 0 0 22 0 22 22 0 0 0 0 0 22
Sub-Total 11,538 12,058 (520) 11,001 (520) 1,040 11,521 5,074 11,521 9,808 10,096 7,793 10,910 10,910 61,038
Asset Management - Bridges
Bridge Refurbishment Programme 1,272 1,218 54 1,736 54 (337) 1,453 145 1,453 2,558 2,520 3,201 2,000 2,000 13,732
Vehicular Bridge Parapets Programme - Assess & Upgrade 0 1 (1) 35 (1) 34 34 0 0 0 0 0 34
Old Perth Bridge - Strengthening 50 34 16 50 16 59 125 13 125 2,410 0 0 0 0 2,535
Perth Queens Bridge - Strengthening 252 262 (10) 143 (10) (48) 85 29 85 118 2,153 0 0 0 2,356
Garry Viaduct 38 38 0 372 0 372 2 372 300 1,900 1,790 0 0 4,362
Culteuchar Culvert 433 445 (12) 20 (12) 8 8 0 0 0 0 0 8
Sub-Total 2,045 1,998 47 2,356 47 (326) 2,077 189 2,077 5,386 6,573 4,991 2,000 2,000 23,027
Improvement Schemes
A977 Upgrades 367 362 5 173 5 (177) 1 1 177 0 0 0 0 178
Brioch Road, Crieff - Road Realignment & Safety Measures 31 13 18 0 18 18 18 0 0 0 0 0 18
Sub-Total 398 375 23 173 23 (177) 19 0 19 177 0 0 0 0 196
Rural Flood Protection Schemes
Almondbank Flood Protection Scheme 17 200 (183) 0 (183) 183 0 0 0 0 0 0 0 0
Revenue Contribution 0 (183) 183 0 183 (183) 0 0 0 0 0 0 0 0
Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 92 95 (3) 262 (3) 259 38 259 0 0 0 0 0 259
Comrie Flood Protection Scheme 1,273 1,108 165 10,310 165 10,475 48 10,475 15,420 9,609 0 0 0 35,504
Milnathort Flood Protection Scheme 51 24 27 229 27 256 256 83 0 0 0 0 339
South Kinross Flood Protection Scheme 251 245 6 412 6 418 1 418 1,783 8,823 3,150 75 0 14,249
Scone Flood Protection Scheme 0 0 50 0 50 50 69 68 535 45 0 767
Flood Mitigation Measures - Dunkeld and Craigie Burn 0 0 1,000 0 (992) 8 8 72 48 180 375 317 1,000
Coastal Change Adaptation 0 0 100 0 100 100 0 0 0 0 0 100
Sub-Total 1,684 1,489 195 12,363 195 (992) 11,566 87 11,566 17,427 18,548 3,865 495 317 52,218
Climate Change
Nature Restoration 386 329 57 0 57 175 232 10 232 0 0 0 0 0 232
Sub-Total 386 329 57 0 57 175 232 10 232 0 0 0 0 0 232
Waste Strategy
Recycling Improvement Fund 2,363 1,977 386 0 386 386 202 386 0 0 0 0 0 386
Scottish Government Grant (2,363) (1,977) (386) 0 (386) (386) (386) 0 0 0 0 0 (386)
Sub-Total 0 0 0 0 0 0 0 202 0 0 0 0 0 0 0
Page 75 of 132

Page 76

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
24-Apr-24 Forward 24-Apr-24 Forward Adjustment 18-Sep-24 31-Jul-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24
to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2023/24 2024/25 2024/25 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins 145 136 9 258 9 267 86 267 200 200 200 220 220 1,307
Wheeled Bin Replacement Programme - Commercial Bins 171 142 29 57 29 86 86 20 20 20 25 25 196
Recycling Containers, Oil Banks & Battery Banks Replacement Programme205 103 102 120 102 222 96 222 105 105 105 70 70 677
Capital Receipts - Disposals (9) (7) (2) 0 (2) (2) (2) (2) 0 0 0 0 0 (2)
Litter Bins 25 25 0 50 0 50 50 50 50 50 55 55 310
Smart Cities - Smart Waste 45 46 (1) 0 (1) 1 0 0 0 0 0 0 0 0
Third Party Contribution (ERDF) (24) (28) 4 0 4 (4) 0 0 0 0 0 0 0 0
Vehicle Replacement Programme 3,700 2,460 1,240 8,031 1,240 9,271 2,682 9,271 2,800 2,800 2,500 3,000 3,000 23,371
Capital Receipts - Vehicle Disposals (306) (219) (87) (500) (87) (587) (117) (587) (352) (352) (322) (300) (300) (2,213)
Street Lighting Renewal - LED & Column Replacement 774 659 115 898 115 1,013 228 1,013 835 551 592 0 0 2,991
LED Traffic Signal Replacement 4 4 0 0 0 0 0 0 0 0 0 0 0
Almondbank Flood Protection Scheme 3 3 0 0 0 0 0 0 0 0 0 0 0
Sub Total 4,733 3,324 1,409 8,914 1,409 (3) 10,320 2,973 10,320 3,658 3,374 3,145 3,070 3,070 26,637
TOTAL - ENVIRONMENT & INFRASTRUCTURE 21,683 20,295 1,388 35,641 1,388 456 37,485 8,845 37,485 37,571 39,706 20,755 17,475 17,297 170,289
HOUSING & COMMUNITIES
Community Greenspace
Play Areas - Improvements Implementation Strategy 423 407 16 973 16 989 4 989 561 150 150 500 500 2,850
Third Party Contribution (10) (6) (4) 0 (4) (4) (4) 0 0 0 0 0 (4)
3G Pitch, Blairgowrie 3 3 0 117 0 117 117 0 0 0 0 0 117
Settlement/Neighbourhood Parks 26 26 0 429 0 429 429 0 0 0 0 0 429
Countryside Sites 0 0 139 0 139 139 0 0 0 0 0 139
Community Greenspace Sites 0 1 (1) 306 (1) 305 305 450 898 894 700 700 3,947
Community Greenspace Bridges 38 10 28 100 28 128 27 128 0 0 0 0 0 128
Third Party Contribution 0 0 (13) 0 (13) (13) 0 0 0 0 0 (13)
Revenue Contribution (11) (11) 0 (11) (11) (11) 0 0 0 0 0 (11)
Core Path Implementation 45 34 11 0 11 11 11 0 0 0 0 0 11
Third Party Contribution (45) (34) (11) 0 (11) (11) (11) 0 0 0 0 0 (11)
Premier Parks 28 3 25 0 25 25 25 0 0 0 0 0 25
Third Party Contribution (14) (14) 0 (14) (14) (14) 0 0 0 0 0 (14)
Auchterarder Public Park 26 26 0 0 0 0 0 0 0 0 0 0 0
The Knock 0 0 0 0 0 0 0 0 0 0 0 0
Third Party Contribution (3) (3) 0 0 0 0 0 0 0 0 0 0 0
Kinnoull Hill 0 0 8 0 8 8 0 0 0 0 0 8
Third Party Contribution (4) (4) 0 0 0 0 0 0 0 0 0 0 0
Cemetery Extensions 20 16 4 60 4 64 64 229 225 375 300 300 1,493
Sub-Total 522 479 43 2,119 43 0 2,162 31 2,162 1,240 1,273 1,419 1,500 1,500 9,094
Prudential Borrowing Projects
Crematorium - Abatement Works 0 (3) 3 0 3 (3) 0 0 0 0 0 0 0 0
Sub Total 0 (3) 3 0 3 (3) 0 0 0 0 0 0 0 0 0
Housing Projects
Gypsy Travellers Site Improvement Works 11 10 1 184 1 185 185 0 0 0 0 0 185
Additional Gypsy Traveller Site Improvement Works 0 0 225 0 225 225 0 0 0 0 0 225
New Gypsy Traveller Site 10 4 6 0 6 6 6 1,990 0 0 0 0 1,996
Less Scottish Government Grant 0 0 0 0 0 0 0 0 0 0 0 0 0
Sub Total 21 14 7 409 7 0 416 0 416 1,990 0 0 0 0 2,406
Public Transport
Community Transport Iniatives 0 0 199 0 199 41 199 0 0 0 0 0 199
Sub-Total 0 0 0 199 0 0 199 41 199 0 0 0 0 0 199
Community Planning
Community-Led Asset Transfers 0 0 75 0 75 75 0 0 0 0 0 75
Sub-Total 0 0 0 75 0 0 75 0 75 0 0 0 0 0 75
TOTAL - HOUSING & COMMUNITIES 543 490 53 2,802 53 (3) 2,852 72 2,852 3,230 1,273 1,419 1,500 1,500 11,774
ECONOMY, DEVELOPMENT & PLANNING
Improvement Schemes
A9/A85 Road Junction Improvements 57 58 (1) 213 (1) 212 212 0 0 0 0 0 212
Cross Tay Link Road (CTLR) 57,785 54,310 3,475 41,270 3,475 44,745 10,363 44,745 0 0 0 0 0 44,745
Scottish Government Grant (15,000) (15,000) 0 0 0 0 0 0 0 0 0 0 0
Bertha Park Link Road 324 306 18 668 18 686 334 686 400 10,000 1,808 0 0 12,894
Sub-Total 43,166 39,674 3,492 42,151 3,492 0 45,643 10,697 45,643 400 10,000 1,808 0 0 57,851
Page 76 of 132

Page 77

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
24-Apr-24 Forward 24-Apr-24 Forward Adjustment 18-Sep-24 31-Jul-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24
to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2023/24 2024/25 2024/25 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Perth & Kinross Place-making
Mill Street Environmental Improvements 49 50 (1) 0 (1) (1) (1) 0 0 0 0 0 (1)
Perth, Place, People 0 0 3,598 0 3,598 3,598 0 0 0 0 0 3,598
Perth City Centre Golden Route (Rail Station) 51 21 30 38 30 68 24 68 0 0 0 0 0 68
City Greening 0 0 31 0 31 31 0 0 0 0 0 31
Perth & Kinross Lighting Action Plan 638 428 210 1,110 210 1,320 53 1,320 0 0 0 0 0 1,320
Sub-Total 738 499 239 4,777 239 0 5,016 77 5,016 0 0 0 0 0 5,016
Other Planning Projects
Creative Exchange (former St. John's Primary School) 53 1 52 0 52 52 52 0 0 0 0 0 52
Local Full Fibre Network 26 5 21 0 21 21 21 0 0 0 0 0 21
Third Party Contribution - Tay Cities Deal (4) 16 (20) 0 (20) (20) (53) (20) 0 0 0 0 0 (20)
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 429 503 (74) 0 (74) (74) 5 (74) 0 0 0 0 0 (74)
Third Party Contribution - ERDF (162) (160) (2) 0 (2) (2) (2) 0 0 0 0 0 (2)
Third Party Contribution - Tay Cities Deal (267) (336) 69 0 69 69 69 0 0 0 0 0 69
Revenue Contribution 0 (7) 7 0 7 7 7 0 0 0 0 0 7
Perth Eco-Innovation Park at Perth West 0 0 23,800 0 (23,020) 780 780 9,737 22,300 0 0 0 32,817
Third Party Contributions - Tay Cities Deal 0 0 (999) 0 (999) (999) (550) (505) (2,946) (500) (956) (6,456)
Other Third Party Contributions 0 0 0 0 0 0 0 (2,000) (3,000) (1,000) (1,000) (7,000)
Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 0 0 0 (550) (725) (650) (680) (2,605)
Economic Development Investment - Land & Serviced Units 0 0 1,000 0 1,000 1,000 1,000 0 0 0 0 2,000
Adapt Your Property - Vacant Town & City Centre Space 0 0 300 0 300 300 0 0 0 0 0 300
Sub-Total 75 22 53 24,101 53 (23,020) 1,134 (48) 1,134 10,187 19,245 (6,671) (2,150) (2,636) 19,109
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units 57 14 43 0 43 43 43 0 0 0 0 0 43
Broxden Business Park - Additional Infrastructure 10 10 0 10 10 10 0 0 0 0 0 10
Western Edge, Kinross - Site Servicing 5 22 (17) 0 (17) (17) 17 (17) 0 0 0 0 0 (17)
Broxden Drainage Mitigation Works 638 283 355 866 355 1,221 1,683 1,221 0 0 0 0 0 1,221
Third Party Contribution (Scottish Water) (470) (209) (261) (658) (261) (919) (919) 0 0 0 0 0 (919)
Ruthvenfield Business Centre 116 16 100 1,256 100 1,356 1,356 0 0 0 0 0 1,356
North Muirton Drainage 17 15 2 0 2 2 2 0 0 0 0 0 2
Sub-Total 373 141 232 1,464 232 0 1,696 1,700 1,696 0 0 0 0 0 1,696
Prudential Borrowing Projects
Land Purchase & Development (Hotel Development) 0 0 950 0 950 950 950 0 0 0 0 1,900
Sub Total 0 0 0 950 0 0 950 0 950 950 0 0 0 0 1,900
TOTAL - ECONOMY, DEVLOPMENT & PLANNING 44,352 40,336 4,016 73,443 4,016 (23,020) 54,439 12,426 54,439 11,537 29,245 (4,863) (2,150) (2,636) 85,572
PROPERTY SERVICES
Project Support
Investment in the Learning Estate 1,734 1,868 (134) 10,145 (134) (8,440) 1,571 409 1,571 13,050 8,650 6,823 0 0 30,094
Scottish Govt. Grant (Inspiring School Age Childcare Spaces) (105) (105) 0 0 0 0 0 0 0 0 0 0 0
Methven Primary School Refurbishment 243 258 (15) 21 (15) 200 206 8 206 3,500 300 0 0 0 4,006
Breadalbane Academy, Aberfeldy - 3G Pitch 29 28 1 0 1 (1) 0 0 0 0 0 0 0 0
Third Party Contribution (The Scottish Football Association) (29) (29) 0 0 0 0 0 0 0 0 0 0 0
Kirkmichael Primary School Upgrades 0 6 (6) 32 (6) (1) 25 25 0 0 0 0 0 25
Capital Receipt (ring-fenced) (128) (127) (1) 0 (1) 1 0 0 0 0 0 0 0 0
Early Learning & Childcare 0 0 0 0 0 0 0 0 0 0 0 0
- Letham Primary School Upgrade Project 0 (59) 59 0 59 (59) 0 0 0 0 0 0 0 0
- Oakbank Primary School Upgrade Project 12 12 0 0 0 0 0 0 0 0 0 0 0
- Rattray Primary School Upgrade Project 155 135 20 0 20 20 20 0 0 0 0 0 20
North/West Perth - New Primary School 718 546 172 0 172 (172) 0 24 0 341 7,672 15,400 0 0 23,413
Riverside Primary New School 3,410 2,927 483 0 483 483 33 483 0 0 0 0 0 483
Perth Academy - Refurbishment 3,066 3,112 (46) 1,745 (46) 1,699 521 1,699 1,650 1,650 0 0 0 4,999
Perth Grammar School - Upgrade Programme Phase 3 1,112 985 127 1,857 127 (984) 1,000 4 1,000 1,500 1,488 0 0 0 3,988
Perth High School - Internal Services & Refurbishment 16 4 12 0 12 12 12 0 0 0 0 0 12
Perth High School - New School Investment 20,404 19,845 559 36,340 559 4,000 40,899 9,681 40,899 6,600 3,600 0 0 0 51,099
Harris Academy/Invergowrie - Extension 4,211 3,770 441 150 441 591 21 591 0 0 0 0 0 591
Blairgowrie Recreation Centre - Replacement 16,374 16,897 (523) 13,150 (523) 2,700 15,327 7,835 15,327 1,303 0 0 0 0 16,630
Technology Upgrades 128 25 103 1,016 103 (1,043) 76 76 76 771 522 0 0 0 1,369
Sub-Total 51,350 50,098 1,252 64,456 1,252 (3,799) 61,909 18,612 61,909 28,715 23,882 22,223 0 0 136,729
Project & Contracts
Free School Meal Expansion Programme 1,348 213 1,135 2,000 1,135 (3,135) 0 0 1,000 2,135 0 0 0 3,135
Community Campus Access Adaptations 0 0 25 0 (10) 15 15 10 0 0 0 0 25
Sub-Total 1,348 213 1,135 2,025 1,135 (3,145) 15 0 15 1,010 2,135 0 0 0 3,160
Property Service Manager
DDA Adaptation & Alteration Works Programme 400 380 20 210 20 230 230 200 200 200 0 0 830
Property Compliance Works Programme 575 754 (179) 727 (179) 469 1,017 308 1,017 650 650 400 0 0 2,717
Third Party Contribution (LAL) (25) (25) 0 0 0 0 0 0 0 0 0 0 0
Capital Improvement Projects Programme 2,037 1,810 227 2,038 227 2,265 120 2,265 1,800 1,800 894 10,000 10,000 26,759
Pitlochry High School - Upgrade Programme 180 152 28 136 28 164 1 164 0 0 0 0 0 164
Friarton Depot - Waste Transfer Station 0 0 2,250 0 (2,000) 250 3 250 2,531 0 0 0 0 2,781
Page 77 of 132

Page 78

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
24-Apr-24 Forward 24-Apr-24 Forward Adjustment 18-Sep-24 31-Jul-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24 18-Sep-24
to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2023/24 2024/25 2024/25 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Energy Efficiency Works - Various Properties 27 27 0 0 0 0 0 0 0 0 0 0 0
Revenue Contribution (Salix Reserve) (27) (27) 0 0 0 0 0 0 0 0 0 0 0
Letham Community Wellbeing Hub 1,571 1,438 133 0 133 133 133 0 0 0 0 0 133
Third Party Contribution (Letham4All) (519) (481) (38) 0 (38) (38) (38) 0 0 0 0 0 (38)
PH2O 0 0 500 0 500 500 2,000 25,000 25,000 25,000 12,500 90,000
Perth Museum 2,368 2,201 167 0 167 167 167 0 0 0 0 0 167
Perth Art Gallery 3,272 377 2,895 0 2,895 (2,795) 100 100 2,795 0 0 0 0 2,895
Sub-Total 9,859 6,606 3,253 5,861 3,253 (4,326) 4,788 432 4,788 9,976 27,650 26,494 35,000 22,500 126,408
Prudential Borrowing Projects
Decarbonisation 550 661 (111) 1,450 (111) 1,339 269 1,339 0 0 0 0 0 1,339
Energy Conservation & Carbon Reduction Programme 138 142 (4) 150 (4) 146 146 150 150 150 0 0 596
Pullar House - Purchase & Re-Purposing 0 0 0 0 0 0 0 10,000 0 0 0 0 10,000
Kinnoull Street Car Park - Purchase 0 0 0 0 0 0 0 2,250 0 0 0 0 2,250
Sub-Total 688 803 (115) 1,600 (115) 0 1,485 269 1,485 12,400 150 150 0 0 14,185
TOTAL - PROPERTY SERVICES 63,245 57,720 5,525 73,942 5,525 (11,270) 68,197 19,313 68,197 52,101 53,817 48,867 35,000 22,500 280,482
CUSTOMER & DIGITAL SERVICES
ICT Infrastructure Replacement and Upgrade Programme 2,416 2,365 51 6,745 51 (1,869) 4,927 87 4,927 3,562 3,273 7,698 6,472 3,687 29,619
Data & Analytics 600 546 54 806 54 (260) 600 68 600 1,206 720 708 716 733 4,683
Supporting Digital 700 665 35 963 35 (248) 750 133 750 1,175 928 1,185 914 920 5,872
Software Licences (Revenues & Benefits) 52 52 0 51 0 51 51 51 51 49 0 0 202
School Audio-Visual (AV) Equipment Replacement Programme 50 27 23 173 23 196 191 196 35 35 35 300 471 1,072
Mosaic - Swift Social Work System Replacement 950 837 113 1,355 113 (95) 1,373 153 1,373 172 177 653 0 0 2,375
Revenue Contribution 0 0 (50) 0 9 (41) (41) (124) (124) 0 0 0 (289)
Hardware 16 9 7 15 7 22 2 22 15 14 14 25 25 115
Licenses 152 184 (32) 112 (32) 80 80 95 71 71 75 75 467
MIS - SEEMIS Licensing 745 745 0 0 0 0 0 0 0 0 0 0 0
Case Management System 0 0 0 0 80 80 80 0 0 0 0 0 80
TOTAL - CUSTOMER & DIGITAL SERVICES 5,681 5,430 251 10,170 251 (2,383) 8,038 634 8,038 6,187 5,145 10,413 8,502 5,911 44,196
HEALTH & SOCIAL CARE
Occupational Therapy Equipment 350 350 0 250 0 50 300 300 250 250 150 250 200 1,400
Technology Enabled Telecare 650 665 (15) 1,625 (15) (1,000) 610 188 610 1,088 1,087 1,087 1,000 0 4,872
Moving & Handling Office Refurbishment 0 0 29 0 (29) 0 0 29 0 0 0 0 29
Software Licences 53 54 (1) 53 (1) 52 14 52 53 53 69 70 70 367
Developing Supported Tenancies 0 0 229 0 (229) 0 0 229 0 0 0 0 229
TOTAL - HEALTH & SOCIAL CARE 1,053 1,069 (16) 2,186 (16) (1,208) 962 202 962 1,649 1,390 1,306 1,320 270 6,897
TOTAL COMPOSITE NET EXPENDITURE 136,557 125,340 11,217 198,184 11,217 (37,428) 171,973 41,492 171,973 112,275 130,576 77,897 61,647 44,842 599,210
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
CAPITAL INCOME & RECEIPTS
General Capital Grant - Scottish Government (22,699) (20,944) (1,755) (24,078) (1,755) 1,056 (24,777) (9,436) (24,777) (13,239) (19,255) (12,750) (12,750) (12,750) (95,521)
Developer Contributions (2,847) (1,440) (1,407) (2,300) (1,407) (3,707) (3,707) (2,367) (2,600) (2,600) (2,500) (2,500) (16,274)
General Fund - Capital Receipts/Disposal (801) (1,486) 685 (419) 685 (742) (476) (199) (476) (444) 0 0 0 0 (920)
Commercial Property - Capital Receipts/Disposal 0 1 (1) (712) (1) 0 (713) (69) (713) (430) 0 (1,088) 0 0 (2,231)
Total: Capital Receipts (26,347) (23,869) (2,478) (27,509) (2,478) 314 (29,673) (9,704) (29,673) (16,480) (21,855) (16,438) (15,250) (15,250) (114,946)
Annual Composite Borrowing Requirement 110,210 101,471 8,739 170,675 8,739 (37,114) 142,300 31,788 142,300 95,795 108,721 61,459 46,397 29,592 484,264
CAPITAL RECEIPTS BROUGHT FORWARD (2,245) (2,245) 0 (1,872) 0 (230) (2,102) (2,102) (2,102) (1,120) (1,550) (1,550) (2,638) (2,638) (2,102)
CAPITAL RECEIPTS CARRIED FORWARD 1,872 2,102 (230) 1,120 (230) 230 1,120 471 1,120 1,550 1,550 2,638 2,638 2,638 2,638
TOTAL NET COMPOSITE BORROWING REQUIREMENT 109,837 101,328 8,509 169,923 8,509 (37,114) 141,318 30,157 141,318 96,225 108,721 62,547 46,397 29,592 484,800
Page 78 of 132

Page 79

Project Project Description
ENVIRONMENT & INFRASTRUCTURE
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety
Road Safety Initiatives - A94 Safety Improvements A programme of works to improve road safety
Active Travel Grant - Traffic & Road Safety Schemes A programme of works to improve active travel
Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities
Schools Road Safety Measures A programme of works to improve road safety in the vicinity of schools
20mph Signage Programme - Schools A programme of works to improve road safety in the vicinity of schools
20mph Signage Programme A programme of works to introduce 20mph speed limits.
Car Parking Investment Construction of new car park in Auchterarder
Car Parking Investment - Pitlochry Purchase of land and construction of a public car park
Roads & Lighting
Structural Maintenance
Road maintenance to extend the life of roads, including predominately road
resurfacing, surface dressings, installing new drainage infrastructure and repairs
to and replacement of defective embankments and retaining walls
Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal infrastructure
Footways Replacement of existing  deteriorated footway surfaces
Street Lighting Replacement of existing street lighting lanterns, columns and cable network.
Investment in Local Footpaths A programme of works to improve and provide local footpaths
Road Safety Barriers Renewal of existing barriers where unrecoverable damage has occurred and
renewal of barriers where timber posts have been used in construction
Bridges
Bridge Refurbishment Programme Used to appoint specialist external inspection teams and consultants to carry out
specialist access bridge inspections and assessments
Vehicular Bridge Parapets Programme - Assess &
Upgrade Assessment and Upgrading of Vehicle Parapets Programme
Old Perth Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a
range of assessment, investigation, strengthening and improvement works
Perth Queens Bridge - Strengthening Carry out works recommended by the 2018 Bridge Assessment study, including a
range of assessment, investigation, strengthening and improvement works
Garry Viaduct
Replacement of Bearings and Parapets; including strengthening of deck for
bearing replacement jacking up, and to cater for increased parapet vehicular
deterrent capacity
Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert
Improvement Schemes
A977 Upgrades A programme of works to improve road safety along the A977.
Broich Road, Crieff - Road Realignment & Safety
Measures Complete
Rural Flood Protection Schemes
Almondbank Flood Protection Scheme Substantially complete
Perth Flood Protection Scheme (South Inch Culvert
Reinstatement)
Ground investigation and monitoring then design project to refurbish existing
culvert
Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Comrie
Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Milnathort
South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in South
Kinross
Scone Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding in Scone
Flood Mitigation Measures - Dunkeld and Craigie
Burn
Design and construction of schemes to reduce the risk of flooding in Dunkeld and
Craigie Burn
Coastal Change Adaptation Design and construct projects to deal with incidents of coastal erosion
Climate Change
Nature Restoration
Protection and restoration of biodiversity focusing on over-exploitation of the
natural environment and addressing its consequences; habitat loss and
fragmentation; and invasive non-native species.
Waste Strategy
Recycling Improvement Fund External Scottish Government funding (Recycling Improvement Fund) to roll out
4th bin to householders for recycling
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic
Bins
Replacement of damaged and end of life wheeled bins for households. Also
suppling bins for new properties
Wheeled Bin Replacement Programme -
Commercial Bins Replacement of damaged and end of life wheeled bins for commercial customers.
Also suppling bins for new customers and changes to collection contracts
Recycling Containers, Oil Banks & Battery Banks
Replacement Programme Replacement of damaged and end of life oil and battery banks
Page 79 of 132

Page 80

Project Project Description
Litter Bins Replacement of damaged and end of life litter bins and/or for general supply of
litter bins where required.
Vehicle Replacement Programme Fleet vehicle replacement programme
Street Lighting Renewal - LED & Column
Replacement Street Lighting LED conversion and column replacement programme
HOUSING & COMMUNITIES
Community Greenspace
Play Areas - Improvements Implementation Strategy Regular refurbishment of 146 play areas based on approx. 6-8 per year.  Involves
community engagement and often co-funding and design of the sites
3G Pitch, Blairgowrie Two phase community led project to provide a new full sized 3G football pitch and
pavilion
Settlement/Neighbourhood Parks Refurbishment of neighbourhood parks working in partnership with communities to
improve, update and renew worn out or obsolete infrastructure
Countryside Sites Refurbishment of more natural parks and open spaces
Community Greenspace Sites Main fund for all Community Greenspace Sites which is drawn down to support
the overall capital programme of refurbishments and upgrades
Community Greenspace Bridges Refurbishment programme for all bridges on Community Greenspace sites
Core Path Implementation Holding budget for Crieff Comrie Core path development mainly funded through
Sustrans
Premier Parks Small budget to facilitate refurbishment of former Premier Park upgrades
Auchterarder Public Park Major play area upgrade co-funded and designed with the community
Kinnoull Hill Complete
Cemetery Extensions Funding to allow the extension of existing or development of new cemeteries to
address the pressure for burial space
Housing Projects
Gypsy Travellers Site Improvement Works Programme of works for improvements on Gypsy Traveller sites at Bobbin Mill and
Double Dykes
Additional Gypsy Traveller Site Improvement Works Additional funding to support improvements works programme on Gypsy Traveller
sites
New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site
Public Transport
Community Transport Iniatives
Purchase of vehicles and charging infrastructure for community
transport/resilience groups to use to deliver on unmet need in the local area.
Community Planning
Community-Led Asset Transfers
Financial assistance for community groups wishing to take on PKC assets using
the community asset transfer process
ECONOMY, DEVELOPMENT & PLANNING
Improvement schemes
A9/A85 Road Junction Improvements
New infrastructure including a new A9 overbridge, a bridge over the River Almond
and road linking the A85 to Inveralmond and Bertha Park (Phase 1 of Perth
Transport Futures Project) - complete
Cross Tay Link Road (CTLR)
New road and major structure over the River Tay, linking the A9 north of
Inveralmond and the A94 north of Scone (Phase 2 of Perth Transport Futures
Project).
Bertha Park Link Road
Phase 3 of Perth Transport Futures Project which is a new link road (1.4km)
running through Bertha Park, connecting Phases 1 and 2. Status - specimen
design underway.
Perth & Kinross Place-making
Mill Street Environmental Improvements
Potential compensation payments associated with claims against compulsory land
acquisition to enable delivery of environmental improvements to stimulate and
support development and investment
Perth, Place, People
Design and development of sustainable transport corridors to improve access to
and from Perth and enable additional development and improvement within Perth
city centre
Perth City Centre Golden Route (Rail Station)
Design and development of improvements to access, signage and animation from
rail and bus station to Perth city centre to complement improvements to integration
of transport
City Greening Improvements to support enhancement of retail trading environment and
residential areas and enhanced use of space for markets, events and alfresco use
Perth & Kinross Lighting Action Plan
Architectural and creative lighting to enhance city and towns appearance, reduce
energy cost and increase safety at nighttime to increase dwell time, support the
hospitality sector, events and grow the evening economy
Page 80 of 132

Page 81

Project Project Description
Other Planning Projects
Creative Exchange (former St. John's Primary
School)
Repurposing old school to offer space to creative industry businesses and create
the Famous Grouse Idea Centre, a space to support business innovation. 
Complete
Local Full Fibre Network Provision of gigabit fibre connectivity to Council's buildings to unlock gigabit
connectivity for surrounding communities. Completed
Low Carbon Transport & Active Travel Hub -
Broxden EV Chargers
Provision of fast EV chargers combined with solar power generation and battery
storage at Broxden Park & Ride - Near completion
Perth Eco-Innovation Park at Perth West
Provision of enabling infrastructure (access road, A9 underpass and unit
platforms) to develop 25ha of employment land supporting clean growth, business
innovation and jobs - Phase 1 (11ha) - In development
Economic Development Investment - Land &
Serviced Units
Provision of serviced lands and business units - Additional business units (eg
Northfields Business Park and Kinross Business Park) - procurement for design in
progress followed by construction.
Adapt Your Property - Vacant Town & City Centre
Space
Adapt Your Property supports capital adaptation works to empty and underused
commercial property in city & town centres, looking at adaptation to attract new
commercial, community or residential use.
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing &
Provision of Units Only road adoption works remaining
Broxden Business Park - Additional Infrastructure Only road adoption works remaining
Western Edge, Kinross - Site Servicing Only road adoption works remaining
Broxden Drainage Mitigation Works Drainage/pumping station works underway and subject to agreement/contribution
from Scottish Water
Ruthvenfield Business Centre Works on redevelopment in progress
North Muirton Drainage Drainage/pumping station underway
Prudential Borrowing Project
Land Purchase & Development (Hotel Development) Development agreement secured and release of grant for heritage subject to
progression through planning and cost evidence
STRATEGY, PEOPLE & RESOURCES
Property Services - Project Support
Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our existing school
estate
Methven Primary School Refurbishment Upgrade of Methven Primary School facilities
Breadalbane Academy, Aberfeldy - 3G Pitch Additional investment required to upgrade 2G to 3G
Kirkmichael Primary School Upgrades Upgrade of Kirkmichael Primary School facilities
Early Learning & Childcare
- Letham Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure - Completed
- Oakbank Primary School Upgrade Project 1140 hrs project - Completed
- Rattray Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure - Completed
North/West Perth - New Primary School New primary school located at Bertha Park
Riverside Primary New School Replacement of North Muirton and Balhousie primary schools
Perth Academy - Refurbishment Investment to upgrade the infrastructure and environment of the Perth Academy
including structural work to sports block, lighting upgrades, classroom upgrades
and science block cladding
Perth Grammar School - Upgrade Programme Phase
3
Investment to upgrade the infrastructure and environment of the Perth Grammar
School including structural work to assembly hall, AV and WiFi upgrades,
classroom refurbishment and door upgrades
Perth High School - Internal Services &
Refurbishment
Necessary works to the infrastructure and environment of the current Perth High
School
Perth High School - New School Investment Replacement of the existing Perth High School
Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy in Dundee for
continuation of access for pupils based in Invergowrie
Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie
Technology Upgrades Upgrade to practical teaching environment within the existing school estate
Property Services - Projects & Contracts
Free School Meal Expansion Programme Upgrading kitchen and dining facilities to provide the enhanced Free School Meals
programme
Community Campus Access Adaptations To support adaptations in schools and community campuses to help facilitate
increased community access
Property Services - Property Service Manager
DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council Buildings - e.g.
Ramps/Lifts/Door Access/Accessible Toilets and Changing Areas
Property Compliance Works Programme
To ensure compliance with current and changing legislation including - New Fire
Alarms; Lighting; Wiring; Fire Protection Works; Gas pipework within buildings
and Roof Restraint safety systems
Page 81 of 132

Page 82

Project Project Description
Capital Improvement Projects Programme
Roof Upgrades; Full internal refurbishment works; New Heating Systems; Boilers
and pipework; Structural Upgrades; Small extensions; New Windows/Doors; New
Fencing; New Cladding
Pitlochry High School - Upgrade Programme
Upgrades to Mechanical and Electrical Infrastructure, including rewiring, heating
and controls systems, replacement lighting and consequential building works such
as new ceilings, painting and flooring
Friarton Depot - Waste Transfer Station
This project aims to refurbish the main waste transfer station building to provide a
safe environment for workers. The project will involve a complete re-cladding of
the existing structure, new doors and new services installation. Some initial
enabling work are being carried out currently.
Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to reduce energy cost across
the property estate
Letham Community Wellbeing Hub Refurbishment of Letham Wellbeing Hub to offer a range of services to the local
community managed by Letham4All - scheduled for completion end 2023
PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink. On hold pending
outcome of Leisure and Culture Assets Review
Perth Museum
Refurbishment of Perth City Hall to create new museum spaces and cafe. Main
construction phase complete and install/fit out on schedule for planned opening
spring 2024
Perth Art Gallery Refurbishment of temporary galleries - scheduled for completion November 2023
Prudential Borrowing Projects
Decarbonisation This budget will support PKCs path to NetZero and focus primarily on the de-
carbonisation of heat and replacing inefficient direct emissions heat sources
Energy Conservation & Carbon Reduction
Programme
This budget is focused on works to reduce PKC energy consumption and help
achieve annual KPI energy reduction of 3%
Customer & Digital Services
ICT Infrastructure & Replacement and Upgrade
Programme
This Programme delivers the IT / digital environment, digital resources and
systems required by staff and young people. The programme maintains, supports
and develops computers; networks; telephony; Microsoft systems; connectivity
and equipment; datacentres; servers; file storage and back up; security systems
and video conferencing
Data & Analytics
Delivers the governance, tools, technologies and organisation-wide skills required
for optimising value from Council data, driving informed decision making around
resources, priorities and service delivery targets
Supporting Digital
Develops the capabilities we need to be an innovative digital organisation. 
Including developing the Council’s corporate employee (mobile working) and
customer (online services) platforms, to create new digital products and services;
investment in tools such as Microsoft; resourcing innovation and building digital
skills, insight and expertise
Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team
School Audio-Visual (AV) Equipment Replacement
Programme Ensures all Perth and Kinross classrooms have equitable access to audio visual
panels and the digital skills to exploit these resources for learning and teaching
Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system to replace SWIFT
Hardware Funding of additional or bespoke IT Hardware for Communities Staff
Licenses Funding of software contracts
MIS - SEEMIS Licensing Licencing of Schools Management Information System
Case Management System New system to management client cases
HEALTH & SOCIAL CARE
Occupational Therapy Equipment
Supply and install of occupational therapy equipment following referral from
heakth and social care professionals.
Technology Enabled Telecare
Replacement of existing analogue Community Alarm devices to digital alarm units
prior to UK switch-off of analogue network, as well as ongoing rolling replacement
programme.
Moving & Handling Office Refurbishment Relocate staff base, currently under review
Software Licences Various licences for essential social care systems
Developing Supported Tenancies Contribution towards flagship core and cluster facility for adults with learning
disabilities’
Page 82 of 132

Page 83

APPENDIX III
Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
24-Apr-24 Forward 24-Apr-24 Forward Adjustment 31-Jul-24
to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2023/24 2024/25 2024/25 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 TOTAL
£'000 £'000 £'000 £'000 (£'000) £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House New Build Programme
Glebe, Scone - 65 Units 17 11 6 0 6 (6) 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0
17 11 6 0 6 (6) 0 0 0 0 0 0 0 0
Huntingtower, Perth - 70 Units 1 1 0 0 0 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0
1 1 0 0 0 0 0 0 0 0 0 0 0 0
Fairfield, Perth 251 243 8 0 8 (4) 4 4 0 0 0 0 4   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0
251 243 8 0 8 (4) 4 0 4 0 0 0 0 4
Lynedoch Road, Methven - Phase 1 735 733 2 0 2 (2) 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0
735 733 2 0 2 (2) 0 0 0 0 0 0 0 0
Lynedoch Road, Methven - Phase 2 1,334 1,331 3 1,172 3 1,175 619 1,175 0 0 0 0 1,175   
Council Tax (Second Income) 0 0 (240) 0 (240) (240) (240) 0 0 0 0 (240)
Scottish Government Subsidy (1,243) (1,243) 0 0 0 0 0 0 0 0 0 0
91 88 3 932 3 0 935 379 935 0 0 0 0 935
Beechgrove, Perth 0 400 (400) 0 (400) 400 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 (400) 400 0 400 (400) 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
Balhousie, Perth 0 320 (320) 0 (320) 320 0 0 0 0 0 0 0   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 (320) 320 0 320 (320) 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
Future Developments 0 1 (1) 5,091 (1) 5,090 5,090 6,014 6,014 10,292 6,014 33,424   
Council Tax (Second Income) 0 0 0 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0 0 0 0
0 1 (1) 5,091 (1) 0 5,090 0 5,090 6,014 6,014 10,292 6,014 33,424
Total Council House New Build 1,095 1,077 18 6,023 18 (12) 6,029 379 6,029 6,014 6,014 10,292 6,014 34,363
Increase in Council House Stock
Council House Buy-Backs 6,934 7,094 (160) 4,000 (160) 1,365 5,205 4,864 5,205 4,000 4,000 4,000 4,000 21,205
Scottish Government Subsidy (1,680) (1,645) (35) 0 (35) (1,365) (1,400) (1,400) 0 0 0 0 (1,400)
5,254 5,449 (195) 4,000 (195) 0 3,805 4,864 3,805 4,000 4,000 4,000 4,000 19,805
Lock-ups and Garage Sites 0 0 0 50 0 50 50 0 0 0 0 50
Standard Delivery Plan
Heating Upgrade Contract Works 1,033 803 230 1,105 230 1,335 133 1,335 1,320 811 0 0 3,466
Rewiring, Infrastructure & Property Refurbishment 665 723 (58) 1,686 (58) 1,628 147 1,628 850 0 0 0 2,478
Triple Glazing 5,066 5,218 (152) 300 (152) 968 1,116 990 1,116 0 0 0 0 1,116 
- less Third Party Contribution 0 (1) 1 0 1 (1) 0 0 0 0 0 0 0
Controlled Door Entry 17 20 (3) 11 (3) 26 34 19 34 0 0 0 0 34 
- less Third Party Contribution 0 0 0 0 (5) (5) (5) 0 0 0 0 (5)
Kitchen Modernisation Programme 374 526 (152) 1,504 (152) 1,352 241 1,352 2,025 0 0 0 3,377
Bathroom Modernisation Programme 1,436 1,688 (252) 0 (252) 1,250 998 240 998 0 0 0 0 998
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2028/29
PERTH AND KINROSS COUNCIL
6
Page 83 of 132

Page 84

APPENDIX III
Approved Actual Proposed Approved Proposed Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Expenditure Carry Budget Brought Budget Budget to Outturn Budget Budget Budget Budget Budget
24-Apr-24 Forward 24-Apr-24 Forward Adjustment 31-Jul-24
to from Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1 Report 1
2023/24 2023/24 2024/25 2024/25 2023/24 2024/25 2024/25 2024/25 2024/25 2025/26 2026/27 2027/28 2028/29 TOTAL
£'000 £'000 £'000 £'000 (£'000) £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
External Fabric 993 875 118 0 118 1,342 1,460 185 1,460 0 0 0 0 1,460 
- less Third Party Contribution (35) (100) 65 0 65 (142) (77) (77) 0 0 0 0 (77)
Energy Efficiency 940 856 84 388 84 472 88 472 0 0 0 0 472
Multi Storey Flats 428 408 20 1,815 20 1,835 5 1,835 0 0 0 0 1,835
Environmental Improvements 1,049 1,022 27 0 27 245 272 261 272 0 0 0 0 272
Fire Precaution Measures 175 196 (21) 224 (21) (120) 83 12 83 0 0 0 0 83 
- less Third Party Contribution 0 0 0 0 (20) (20) (20) 0 0 0 0 (20)
Sound Insulation 0 0 389 0 389 389 42 0 0 0 431
Structural 15 9 6 250 6 256 8 256 985 0 0 0 1,241
SHQS Future Developments 0 0 0 0 0 0 4,066 4,808 5,553 3,351 17,778
Total Standard Delivery Plan 12,156 12,243 (87) 7,672 (87) 3,543 11,128 2,329 11,128 9,288 5,619 5,553 3,351 34,939
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 82 94 (12) 22 (12) 10 1 10 0 0 0 0 10
Rannoch Road, Perth - Housing Regeneration 27 26 1 60 1 144 205 1 205 0 0 0 0 205
149-151 Dunkeld Road, Perth 277 257 20 0 20 20 20 0 0 0 0 20
111 Rannoch Road, Perth (Former Driving Test Centre) 8 4 4 0 4 (4) 0 1 0 0 0 0 0 0
St.Catherine's Square Redevelopment 0 0 3,393 0 3,393 3,393 0 0 0 0 3,393
Shops & Offices 0 0 50 0 50 50 239 0 0 0 289
Greyfriars and Satellite Sites 2 2 0 50 0 50 9 50 32 0 0 0 82
Sheltered Housing 11 20 (9) 0 (9) 9 0 0 0 0 0 0 0
Double Dykes Chalet Replacement 71 86 (15) 0 (15) 5,964 5,949 51 5,949 573 0 0 0 6,522 
- Scottish Government Grant (71) (71) 0 0 0 (3,426) (3,426) (19) (3,426) 0 0 0 0 (3,426)
General Capital Works 120 120 0 0 0 147 147 12 147 0 0 0 0 147
Upgrade and Replacements to Lifts Programme 21 16 5 116 5 121 121 0 0 0 0 121
ICT Expenditure 21 9 12 50 12 62 62 110 0 0 0 172
Mortgage to Rent 175 0 175 50 175 90 315 141 315 0 0 0 0 315 
- less Government Grant 0 0 0 0 0 (90) (90) (90) (90) 0 0 0 0 (90)
Total Other Investment in Council House Stock 744 563 181 3,791 181 2,834 6,806 107 6,806 954 0 0 0 7,760
Total Net Expenditure 19,249 19,332 (83) 21,536 (83) 6,365 27,818 7,679 27,818 20,256 15,633 19,845 13,365 96,917
Income
CAPITAL RECEIPTS (11) (11) 0 0 0 (5) (5) (5) (5) 0 0 0 0 (5)
CFCR (2,335) (2,335) 0 (1,833) 0 (1,833) (1,833) (2,078) (2,004) (2,125) (2,340) (10,380)
TOTAL BORROWING REQUIREMENT 16,903 16,986 (83) 19,703 (83) 6,360 25,980 7,674 25,980 18,178 13,629 17,720 11,025 86,532
Page 84 of 132

Page 85

SIGNIFICANT CAPITAL PROJECTS
PROGRESS UPDATE
APPENDIX IV
Project Title Total Gross
Budget
(£'000)
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On Site Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement
36,000 0 36,000 36,000 Easter 2025 - new
centre currently
scheduled to open late
2024
Yes Yes On track Yes - on-site. Works are progressing well on-site.
North/West Perth New
Primary School*
24,000 0 24,000 24,000 Summer 2026 No No On track Yes. Project has been put on hold for 2 years due to slow build
out rates at Bertha Park.
Riverside Primary New
School
19,899 0 19,899 19,899 Early summer 2023 Yes Yes Phase 2 On Track Yes - School
operational.
Project complete.
Perth High School - New
School Investment
80,200 0 80,200 80,200 Summer 2026 - school
building curently
scheduled to open
summer 2025
Yes Yes On track Yes - on-site. Works are on programme.
Harris
Academy/Invergowrie
Extension
5,200 0 5,200 5,200 Late 2023 Yes Yes On track Yes. Main extension complete, reconfiguration works still to be
undertaken.
Cross Tay Link Road
(CTLR) 150,500 40,000 110,500 110,500 Spring 2025 Yes Yes On programme No
Works progressing well and project remains on
programme for completion in Spring 2025. No significant
movements in projected spend.  Construction of the
Destiny Bridge segments is near completion thus the
main structural elements of the bridge will shortly be
complete. Works elsewhere continue. Monthly risk
meetings continue with T&T. Detailed analysis of costs
and risks due to take place with Finance in coming
months given the significant risks relating to the structure
have reduced.
Comrie Flood Protection
Scheme 40,821 32,657 8,164 8,164 Autumn 2026 Yes No Contract awarded Yes
Detailed design completed April 2023. Preliminary
advance works completed in July 2023.  The main works
were originally tendered in June 2023 but timed-out.  The
main works were re-tendered and returned in June 2024.
Tender price higher than anticipated; Scottish
Government updated prior to contract award on 21
August 2024. Works to commence from September 2024
for approximately 2 years.
Perth Eco Innovation Park* 32,817 11,275 21,542 21,542
Not currently
programmed No No
Preliminary design
works completed Yes
Following the application for Levelling Up Fund Grant
funding of £10m being unsuccessful, the Council
approved a net increased of £10m on 1 March 2023
however the balance of £20m remains unfunded. Further
contributions and receipts are anticipated in years
beyond the current programme to 2027/28. Approval to
spend £1.55m on the inital design works (including
planning application) was given in June 2024. Associated
work package due to be awarded to consultant in August
2024. Discussions continue with JDLT.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 5-year programme.
6
Page 85 of 132

Page 86

Page 86 of 132

Page 87

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
18 SEPTEMBER 2024 
TRANSFORMATION AND CHANGE PROGRAMME UPDATE 
Report by Strategic Lead - Projects and Programmes
(Report No. 24/262) 
1. PURPOSE 
1.1 This report provides an update to the Finance and Resources Committee on
the progress of the Transformation & Change programme to date along with
benefits realised in phase one.   
1.2 In addition, the report includes a number of actions underway from 1 July
2024 to progress the programme into phase two including: 
• Development of a formalised Programme Management Office which will
have responsibility for oversight, monitoring and reporting of the
Programme.
• Planning for a variety of development and support opportunities being
provided / offered for Project Teams with Service Design principles at the
centre of the programme.
• Definitive Phase 2 programme outline with individual projects being
consolidated into a full portfolio approach.
• General risks associated with the programme. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Finance and Resources Committee: 
(a) Approve that Phase One of the Transformation and Change
programme is complete, and that delivery of Phase two is now
underway and will continue to evolve as we progress
(b) Note the benefits realised in phase one of programme
(c) Approve phase two approach with the development of a formal
Programme Management Office (PMO) model
(d) Note the overarching governance structure for the Programme. 
3. STRUCTURE OF THE REPORT 
3.1 This report is structured over the following sections: 
Section 4: Background 
Section 5: Phase one summary
Section 6: Phase two proposals
Section 7: Conclusion
Appendix 1 – phase one benefits realised
Appendix 2 – phase two programme list
7
Page 87 of 132

Page 88

4. BACKGROUND 
4.1 In June 2022, the Council approved the Transformation & Change Strategy
allowing the development of the Transformation and Change programme, to
support the delivery of the Council’s vision of “a Perth and Kinross where
everyone can live life well, free from poverty and inequality”, together with the
strategic priorities and key objectives outlined in the Corporate Plan 2022-
2027.  
4.2 The overarching aim of the Transformation and Change programme is to
support the delivery of services to the people of Perth and Kinross, particularly
those in greatest need. Council agreed that the programme would be
developed and phased over a five-year period with workstreams undertaken
in Phase One being key to setting the successful foundation for the delivery of
the programme in future. 
4.3 There are currently four different approaches included under the overarching
banner of transformation and change: 
• Transformation – changing the way that we work which will be
significantly different from current ways of working e.g., a marked change
in the form, nature, and appearance of the services we deliver, how and
where we deliver them.
• Service Improvements –improved ways of working led by teams and
services to deliver better outcomes for communities, improved efficiency,
and productivity.
• Re-structure and consolidation – changing the way services and teams
are configured to deliver better outcomes and service priorities.
• Budget efficiencies - budget and service reductions to work within the
financial constraints facing the Council, whilst focusing on agreed priority
areas. 
4.4 Over the past two years, there have been a number of day-to-day service
improvements and budget efficiencies realised by individual services and
teams. Details of these changes, savings and improvements are reflected in
our Annual Performance Report due to be reported to Council in October. 
Our Transformation & Change Programme Management Office have
responsibility for supporting, co-ordinating and reporting on the progress of
complex transformational projects which in some cases have many
workstreams, interdependencies across the organisation and requirement for
cross team working.   
4.5 From July 2022, we have progressed through Phase One of the programme
using a combination of these approaches, allowing us to make savings, shift
expenditure to cover emerging new priorities and help deliver a balanced
budget. Areas of particular focus over this time have been the Senior
Leadership Review and consolidation workstreams, bringing together areas of
corporate and operational work where there are particular similarities, overlap
or synergies. 
Page 88 of 132

Page 89

4.6 We have also made progress in the cultural change programme which has
been designed to overarch and support transformation & change work within
the organisation and will also continue to be delivered into Phase T.wo.
Workstreams have been designed to support our staff, set the right
conditions, and enable behavioural change as we move through our
transformation programme. We have continued to focus on our purpose,
vision and values ensuring that these are reflected in our behaviours and that
we are all responsible for and working in a culture where everyone is valued
and treated with respect. 
4.7 It is important that our Transformation and Change Programme remains
flexible with the ability to adapt to changes in the local and national policy and
legislative landscape where required. This can, at times impact on the speed
of delivery but ensures that we continue to put our corporate priorities at the
forefront of the project, focussing on the key areas for change and
improvement. We are also focussing our resources in this area to ensure we
are prioritising those areas of transformation which will have the greatest
reach and impact 
4.8 As we move forward into Phase Two of the programme, we will continue to
formally report to Finance & Resources Committee on progress, twice a year.
In addition, a series of quarterly member briefings which focus on specific
projects are being scheduled for Elected member participation, discussion
and information. 
5. PHASE ONE SUMMARY 
5.1 We have regularly reported on the progress of the phase one Transformation
& Change programme since 2022 with a full report being presented to F&R
Committee in September 2023 (Report No. 23/245). Following this, an update
was reported to full Council on 28 February 2024 (Report 24/63 Refers) with
phase one project comprising: 
• Finance consolidation
• Property consolidation
• Strategic Planning and Performance consolidation
• Human Resources and Organisational Development consolidation
• Customer Services consolidation
• Press and Communications consolidation
• Professional and Business Support Phase 1
• Community Engagement
• Strategic Commissioning and Procurement 
5.2 All of the consolidation workstreams have now concluded in line with the
Senior Leadership restructure and these changes have been embedded
within the organisation. Further to this, we have started to develop the
redesign projects for some of the areas above and in particular, the last three
projects named will carry forward into Phase Two and updates to Committee
on progress will continue. 
Page 89 of 132

Page 90

Senior Leadership Review 
5.3 The Senior Leadership Review was the most significant undertaking in phase
one of the programme as an overarching organisational programme in itself.
The Review progressed the design and delivery of a new structure for senior
leadership and was a significant undertaking which was approved in June
2023 at full Council, implemented from August 2023 and finalised from 1 April
2024.  Recent changes in August 2024 to the Executive Leadership Team
structure will result in additional savings that will be reported in due course. 
5.4 The Strategic Leadership Team (SLT) has realigned responsibilities and
resources which will form part of individual Phase Two redesign projects and
review the Council’s internal governance arrangements, including the
introduction of themed boards linked to Corporate Plan priorities. There is also
a greater emphasis on community engagement, service redesign and cultural
change going forward. 
5.5 This review has resulted in significant savings of around £789,000 per annum
and fully realised as a cumulative total of £2.255 million in 2026/27: 
2023/24
£’000
2024/25
£’000
2025/26
£’000
2026/27
£’000
Annual Saving 138 664 664 789
Cumulative
saving 
802 1466 2,255 
Consolidation Workstreams 
5.6 Driven by the need to take a more collaborative approach across all areas of
the organisation, as already referenced, Phase One included nine
consolidation workstreams as set out above and brought together teams
historically disaggregated under newly formed single points of management.
This has already addressed areas of duplication, delivered on initial financial
savings, introduced the opportunity for greater consistency and allowed for
better accessibility to the people we serve. These projects are now complete,
however in keeping with the Leadership Development programme in Phase
Two, there will be many areas carried over as service structure redesign
projects. Phase one savings related to consolidation projects have been
reported as follows: 
Page 90 of 132

Page 91

23/24 
£’000 
24/25 
£’000 
25/26 
£’000 
Total 
£’000
Finance  69  131  284  484 
Business Support  112  166  279  557 
Leadership  132  0  0  132 
Property  0  45  78  123 
Performance  20  54  72  146 
HR/OD  40  35  276  351 
Strategic
Commissioning 
0  74  100  174 
CIAM  64  0  0  64 
437  505  1,089  2,031 
Cultural Change 
5.7 The cultural change programme – Phase One has concentrated in three
specific areas: 
• Employee engagement
• Leadership Development
• Communications 
5.8 A number of different initiatives were introduced to embed our values and
behaviours including the Employee Experience which was a three-hour
workshop concentrating on our strategic direction, values and behaviours as
well as how to be the “eyes and ears” of PKC. These sessions were attended
by approximately 80% of the organisation which has been our most
successful and well attended organisational development initiative to date.
Staff evaluation responses indicated a score of 4.7/5 in terms of satisfaction
and relevant content. 
5.9 A leadership development programme with a series of specific
‘masterclasses’ was also introduced for all those with line management
responsibilities. These included an introduction to coaching, resilience skills
and how to hold direct discussions. Further initiatives included learning and
listening sessions with the Executive Leadership Team, an updated Employee
Induction programme with a PKC marketplace highlighting the roles and
responsibilities for various teams across the organisation and business
breakfasts with the Chief Executive. 
5.10 To gain critical employee feedback on cultural change, as well as other areas
of the organisation, the first full staff survey since 2018 – there have been
many smaller temperature checks in the intervening years – was open for
responses to all staff from 15 April to Friday 31 May 2024. This provided
feedback on many areas and gave an indication of the effectiveness and
impact of the cultural change programme on employees.
Page 91 of 132

Page 92

5.11 The response rate for the employee survey was 47%, a 20% increase
significant increase on the 27% return on the last survey in 2022. Survey
Highlights include: 
• 93% of respondents feel they are trusted to make appropriate decisions
within their role
• 93% of respondents believe that Perth and Kinross Council recognises
and celebrates diversity and inclusion
• 92% of respondents feel they have clear direction and
know what’s expected of them
• 92% of respondents feel they have opportunities within
their team/school to share views and ideas
• 91.5% of respondents feel their team demonstrates our values often/every
day
• Staff were asked to rank what was most important to them and their
reasons for working with the Council and the top reason was ‘Making a
Difference’ 
5.12 As a result of areas for improvement, action plans are being collated for
phase two of the cultural change programme with a collective commitment to
taking these forward to support wider transformation and change
workstreams. 
5.13 Summary of Phase One benefits realised 
In addition to the Senior Leadership Review and consolidation workstreams a
number of other benefits have been realised from transformation and change
initiatives across the programme in phase one. These are detailed in
Appendix 1 and summarise work in service improvement, budget savings and
transformation & change workstreams.   
6. PHASE TWO PROPOSALS 
Programme Management Office 
6.1  At the inception of the programme in 2022, a temporary programme support
team was put in place to develop the programme further, oversee its delivery
and provide support and scrutiny to key workstreams. As well as managing
the programme, the small team were also responsible for delivering the
actions relating to our key priority of Tackling Poverty and progressing the
transformation project on locality multi-disciplinary locality working. However,
as the Senior leadership structure has been implemented through Phase one,
this team has been refocussed on a range of wider organisational activities,
sitting within the Strategic Planning, People and Performance service area. 
6.2 This shift in focus gives us the opportunity to refresh the Transformation &
Change Programme approach as we move into Phase Two. A new T&C
Programme Management Office (PMO) model is currently being developed.
The PMO will act as a centralised hub for T&C that ensures consistency of
practice, agrees governance for the overarching programme, provides support
and standardised tools and offers guidance to project teams. The PMO will
Page 92 of 132

Page 93

provide guidance, support and co-ordination to individual programmes and
projects to ensure success and strategic alignment with our key corporate
priorities. 
6.3 Overseeing the full transformation and change programme, the PMO will have
responsibility for monitoring, ensuring appropriate governance, and providing
programme assurance to Board. In addition, the PMO will: 
• Ensure the co-ordination of the different functional areas and look at
common themes across the programme which may need to be addressed
i.e. change to policies, systems etc.
• Identify interdependencies and ensure projects are aligned to council
priorities.
• Advise on resource allocation across the programme.
• Develop programme management methodology and provide professional
and technical advice for the organisation. 
• Management of and reporting on progress of the programme to the PMO
and the Board, highlighting issues and risks to delivery of intended
outcomes and ensure benefits are realised.
• Provide a scrutiny and challenge role. 
6.4 Further to the above, moving forward into phase two, the PMO is committed
to providing regular updates and briefings on the progress of the
transformation and change programme to our elected members. While the
formal reporting approach is necessary to ensure compliance with our
commitments to savings, improvement and positive outcomes, it does not
allow for discussion on our strategic direction in relation to projects and live
challenges being experienced in delivery. 
Service Design approach 
6.5 We are committed to using the principles and process of Service Design
which is undertaken by many local authorities across Scotland and endorsed
by the Scottish Government’s digital office. The vision for the Scottish
Approach to Service Design is that the people of Scotland are supported and
empowered to actively participate in the definition, design, and delivery of
their public services (from policy making to live service improvement). This
brings together national and local government, health, public bodies, charities
and third sector, as well as the private sector. It’s important because we need
to: 
• collaborate to deliver end-to-end service journeys for citizens.
• work together to create the right conditions and a shared language.
• make sure our design methods are inclusive and accessible for everyone,
so that we encourage, empower, and enable all citizens to participate in
designing the services they need. 
6.6  There are clear principles around the service design approach which echo the
commitments of key corporate priority “Working with our communities and
partners and putting people first.” 
Page 93 of 132

Page 94

• We explore and define the problem before we design the solution.
• We design service journeys around people and not around how the public
sector is organised.
• We seek citizen participation in our projects from day one.
• We use inclusive and accessible research and design methods so citizens
can participate fully and meaningfully.
• We use the core set of tools and methods of the Scottish Approach to
Service Design.
• We share and reuse user research insights, service patterns, and
components wherever possible.
• We contribute to continually building the Scottish Approach to Service
Design methods, tools, and community. 
6.7  The Design Council’s Double Diamond model is a visual diagram showing
these design stages and the importance of taking time to understand the
problem before designing solutions. Each diamond shape illustrates the
process of creating or exploring many possible ideas before refining these to
the best idea. The first to confirm the problem, and the second to design the
solution. 
6.8 We are currently working with the Service Design Academy to develop
learning opportunities for senior responsible owners, project managers and
teams to understand and adopt the service design approach in transformation
and change workstreams. In addition, two officers are undertaking the
Professional Development Award in Service Design which will allow us to
bring this expertise inhouse.   
Page 94 of 132

Page 95

Cultural Change 
6.9 We have continued to progress the successful work which was embedded in
phase one in this area as outlined above. Currently underway is a full
Leadership Development Programme working to increase the skills and
knowledge of Senior Leaders.  In addition to this we are developing our Phase
two Cultural change programme to support the delivery of transformation and
change workstreams.  This will include a follow up employee experience
workshop, initiatives to embed a transformation and change mindset –
including a virtual mailbox, employee newsletter and service design
workshops for all employees. 
Phase 2 programme content 
6.10 Phase two of the programme comprises of those projects identified in the Full
Council report of 28 February 2024 along with projects carried forward from
Phase one. In addition, there have been a number of additional projects
identified for progressing in Phase two. A full list of phase two projects with a
short description of expected outcomes is attached as Appendix 2. Projects
can be broken down into three areas: 
Phase Two reported at Council as at 28 February 2024: 
• Additional Support Needs
• Whole Family Wellbeing
• ALEO’s
• Public Transport
• Professional & Business Support
• Multi-disciplinary locality working
• Working Smarter 
Phase One projects carried forward into Phase Two (consolidation to service
redesign): 
• Redesign projects; Finance, Customer Services, Property, Strategic
Planning, People & Performance
• Commissioning & Procurement
• Community Engagement 
Additional Phase Two projects identified: 
• Strategic Leadership – phase 2
• Corporate Landlord Model
• Property structure redesign
• Employability
• Digital Transformation 
• Third Sector Review
• Waste Management
• Decarbonisation
• Tayside Contracts Review
Page 95 of 132

Page 96

6.11 Further work is now being progressed by the PMO, SRO’s and the Board to
develop a portfolio management approach to delivering the programme. 
Working in Partnership and collaboration 
6.12 The Transformation and Change programme is seeking new innovative ways
of working internally and externally with partners and colleagues to ensure we
meet the aims and objectives of our Strategy. In doing this, the PMO will
highlight areas of interdependencies across projects and programmes to
ensure joint working and engagement with all relevant stakeholders. As our
projects are complex and overarch more than one service area, workshops
will be held to identify current areas of overlap and progress plans to work
strategically with a unified approach. 
HSCP Transformation & Change Programme 
6.13 The Health and Social Care Partnership are taking forward their own
Transformation & Change programme which will report into the Integrated
Joint Board for strategic direction and guidance. We will continue to work with
our HSCP colleagues on a regular basis to ensure we are maximising
opportunities for collaboration and joint working. For example, the HSCP are
taking forward a service design approach on their programme “What matters
to you?” and we are learning from the skills and knowledge they are using to
work with people who have experience of health and social care services. 
Engagement with our communities 
6.14 As has been previously mentioned, we have committed to continue working
with our communities and partners through our Corporate Plan key priorities.
Using a service design approach, which focuses on the involvement of people
accessing and using services, will support us in understanding the challenges
of consultation to co-production. The PMO will also provide support to project
teams who need it in terms of engagement methods, facilitation skills and
tools to collate data in a participatory way. 
7. CONCLUSION 
7.1 The Transformation & Change programme has made good progress in
completing a number of project areas over Phase one including the senior
leadership review and consolidation of support services within the Council. 
There are also a number of Phase two projects already underway, meeting
key milestones and already realising benefits – highlighted within this report.
The proposals for progress into phase two will strengthen our approach, allow
for more consistency across workstreams with a newly formed programme
management office and service design approach which will allow for clear
support structures and reporting on progress to Board. 
7.2 We will continue to keep Elected Members updated of overarching progress
through formal Committee reporting structures. In addition, we are in the
process of organising a series of informal workshop briefings over the next
Page 96 of 132

Page 97

twelve months. We will use these sessions to give more details around
specific project areas, achievements and challenges will be highlighted. 
Authors
Name  Designation Contact Details
Charlene Guild Strategic Lead –
Projects &
Programmes
ComCommitteereports@pkc.gov.uk
Norman Ballantine Transformation &
Change Manager
ComCommitteereports@pkc.gov.uk 
Approved 
Name Designation Date
Clare Mailer Depute Chief Executive 11 September 2024 
APPENDICES: - 
Appendix 1 – Phase one benefits realised
Appendix 2 – Phase two programme list 
Page 97 of 132

Page 98

Page 98 of 132

Page 99

Digital customer services
• Getting information right first time by transferring Council Tax,
Scottish Welfare Fund and Community Assistance Line calls to
experienced staff. Providing an end-to-end service from the first point
of contact.
• KARL customer service system delivers a more personalised service
to customers, improved forecasting and data-driven insights for
improved customer service.
• Standardised telephone line configuration to give a more unified
approach for customers and reduce IT demand.
• Managing out of hours demand so that overflow calls from Aberdeen
can be redirected. An out of hours ‘storm’ message has also been
tested and implemented.
• Aligning staff hours to demand to meet customer demand at peak
times with reduced resources.
Public transport
• Community groups have been supplied with multi-purpose vehicles
for local transport.
o Demand Responsive Transport Scheme trial between
Blairgowrie and Dunkeld with Stagecoach East.
o Glenfarg Community Transport Group growing with new routes
and agreement to loan a 16-seater minibus to support them.
• Passenger information initiatives such as QR codes and information
videos to improve range of information and certainty for customers.
• Free bus Saturday rolled out for 2024 as travel incentive. 
Strategic procurement and commissioning
• Optimising existing procurement framework
resulted in £79,000 rebate from Scottish
Procurement Alliance.
• Best value achieved by using Quick Quotes
rather than existing framework for play area
upgrades achieved £40,000 saving.
Summary of benefits delivered
Transformation and Change
7
Page 99 of 132

Page 100

Working smarter
• Public sector hub delivering benefits of co-location and improved
customer service experience.
• Child and adult vaccination services from NHS Tayside moved in to
Pullar House.
• Unlocked opportunities such as a major strategic site becoming
available for affordable housing. 
Collaboration
• Tenant participation and community engagement teams merged to
create a unified approach to collaborating with all community members
on projects, co-design services and achieve better outcomes.
• Community support and enforcement overlaps being reviewed with a
view to consolidating activity currently delivered by several teams to
enhance service levels, streamline provision and improve outcomes for
residents. 
Whole family wellbeing
• Whole Family Wellbeing Directory developed to
raise awareness of services available to
support families.
• Microgrants delivered in partnership with
PKAVS allowed 19 third sector and
community groups to develop activities for
family wellbeing delivered for over 450
children and young people, and over 200
parents/carers.
• Universal Family Support Service delivered by
Aberlour Childcare Trust to provide advice and signposting to around
50-100 people a week and direct support to up to 250 families a year.
Starts 9 September 2024. 
Page 100 of 132

Page 101

Appendix 2
Transformation & Change Programme - Phase Two Projects
Project Name Expected Outcomes
Whole Family Wellbeing  The project aims to support all families who need support
to get the right kind of support where and when they need
it, and for as long as it is needed.  
Community Engagement "To develop options to strengthen the efficiency and
effectiveness of community engagement and
empowerment across the Council.  The Review outcomes
are:
1.Services are more responsive, consistent and
accountable.
2.Economic, social and health outcomes for communities
are improved.
3.Community wealth and social capital is strengthened.
4.Savings and efficiencies are achieved from money,
assets, skills and time.
5.Local democracy is re-energised.
6.Data and evidence drives more effective use of
resources. 
7.Staff are empowered, motivated and more agile. 
Multi-Disciplinary Locality
Working
1.Build stronger relationships across the council, with
partners and communities 
2.Consider new ways to deliver services which are joined
up, flexible and responsive to the needs of communities –
based on feedback and supported by evidence
3.Collaborative approach with partners and communities
to co-design services that meets needs – evidence-based
approach
4.Initially taking a focussed approach tackle inequalities
and poverty – expanding this approach across all priorities
5.Supporting our workforce to be empowered to make
decisions and to take forward the no wrong door approach
– cultural change programme. 
Public Transport Increased awareness and promotion of public transport
within Perth and Kinross. A public transport model that
reduces inequalities, air pollution and supports
improvements to the health and well being of people in
local communities through supporting an inclusive
economy. 
Waste Management Scope currently being developed and working group /
service design process in place. 
Artificial Intelligence (AI)  Scope currently being developed in line with Business
Systems project. 
7
Page 101 of 132

Page 102

Project Name Expected Outcomes
Business Systems 1.To create a detailed picture of how people / resources
are allocated across the organisation supporting Council
business systems and clarify total cost of ownership for
business systems and associated capital / revenue
budgets.
2.To create a Business Capability Model describing how
Business systems collectively deliver on Council
objectives
3.Introduce a new operating model for optimal delivery of
modern digital business including: a revised Business
Relationship and Business Partnership Agreements
between services and IT; a defined model / approach for
decommissioning / retiring Business systems  
4.Improve records management compliance
5.To create a detailed picture of all contracts associated
with all business systems capturing all key procurement
and contract information, allowing for better contract
management in the future. 
Additional Support Needs Transform ASN provision to deliver best value linked to
best practice. 
Learning Estate Review Scope currently being developed 
Customer Services 1.To deliver a streamlined and consolidated customer-
facing service on behalf of the Council, in line with its
values and guiding principles in pursuit of outcomes within
the LOIP and the new Corporate Plan.
2.To bring together the customer billing and collection
functions and maximise the income available to our most
vulnerable citizens.
3.To improve the accessibility of services to residents and
service users and ensure consistency and equality of
access.
4.To ensure customers experience a higher-quality
service within permitted cost constraints. 
5.To consistently achieve excellence and improve
standards of service with most needs being fulfilled at first
point of contact.   
Employability A model which delivers employability services that makes
best use of our current skills, expertise, and resources to
ensure a more coordinated and effective service. 
Page 102 of 132

Page 103

Project Name Expected Outcomes
Finance Service Redesign A more strategically focussed finance service with
investment in financial systems required to enable
automation, improve efficiency and increase reporting
abilities. Integration of finance across all council services
to avoid duplication of effort and improve overarching
financial management. Investing in our people to
strengthen capacity in specific areas which will in turn
strengthen internal support and provide challenge to
budget managers.  
Phase 2 Leadership
Development Programme
The project has a number of different workstreams relating
to the five leadership foundations:
1.Lead the delivery of the Council’s Vision and Corporate
Priorities through evidence of high service performance
and improvement
2.Leading and maintaining strong organisational culture
and organisational behaviours
3.Lead the Council’s organisational transformation and
associated programme of change and service redesign
4.Lead the Council’s commitment to meaningful and
impactful engagement both inside and out with the Council
5.Lead the Council’s management of its people,
resources, organisational risk and reputation
An action plan is in place and expected outcomes are:
1.Considerable savings in relation to redesign and
restructure of services for a more efficient and effective
2.Positive cultural change
Manage and mitigate related risks in relation to leadership
Invest in the development of leadership and aspiring
managers to ensure the right skills at all levels 
Professional & Business
Support
To review existing arrangements and develop options to
consolidate teams and increase the efficiency and
effectiveness of the Professional and Business Support
functions, with a more strategic approach to business
administration and associated functions across the
Council and prioritising available resources aligned to
agreed priorities and need. The project will consider the
options for consolidation and improvement of Professional
and Business Support and Associated Functions currently
in place across Perth and Kinross Council.    
Page 103 of 132

Page 104

Project Name Expected Outcomes
Property Structure & Redesign The project aims to consolidate the strategy and delivery
of property functions and accommodation across PKC.
The annual cost of property was circa £55m in 22/23
plus associated staff costs of approximately £4m. in
addition the general services capital plan and Council
borrowing costs are dominated by historic and current
property investment. The project will seek to clearly
identify property accountabilities, deliver efficiencies in
operation and seek to identify opportunities to rationalise
the portfolio in the medium / long term reducing property
revenue and capital costs.
ALEOS Purpose to review our culture and leisure ALEOS and
recommend structural/wider changes required to
maximise PKC investment 
Tayside Contracts Review A scope is currently in development but expected
outcomes and workstreams include:
1.Renegotiation of current service level agreements to
ensure ongoing efficient, economical and innovative
services are being delivered
2.Efficiency savings in particular areas – some of these
have already been delivered
3.Improved cross regional working groups in specific
areas
4.Improved internal management structure and service 
Corporate Landlord Model Scope currently being developed – Learning Estate
Review will be a primary driver of this model.
Working Smarter 1.Improving collaboration, at all levels, and between
Council staff and our other stakeholders.
2.Embracing technology and new working styles to
facilitate better productivity.
3.Enhancing employee experience and work/life balance
through our more flexible operating model – we
anticipate an additional benefit from this in the areas of
staff recruitment and retention.
4.More effectively using our property estate, allowing
more collaborative working and reducing our carbon
footprint.
5.Establishing a model which will provide for the more
effective, efficient and sustainable delivery of services to
our communities.
Strategic Procurement and
Commissioning Re-design
To design and implement a new operating model for
strategic procurement and commissioning to improve
efficiency and optimise the value and benefits of our
purchasing power.
Strategic Planning &
Performance Service Redesign
A more consistent and consolidated performance and
approach which would enable increased oversight of all
information and ensure our reporting is more efficient
and timeous. Creating an 'organisational brain' which will
allow our services to use data, research and information
which allows them to place communities at heart of how
we work by ensuring we are being more open, honest
and transparent in our public reports as well as keeping
our workforce informed about our position. 
Page 104 of 132

Page 105

PERTH AND KINROSS COUNCIL 
Finance and Resources Committee 
18 September 2024 
POLICY ON DISPOSAL OF MINIBUSES 
Report by Strategic Lead - Environment and Infrastructure
(Report No. 24/263) 
1. PURPOSE 
1.1 The purpose of this report is to seek approval of Finance & Resources
Committee to amend the Council’s policy on the disposal of Fleet and
Mechanical Equipment with specific regard to minibuses which have reached
the end of their operational life within Council service. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
• approves the Policy for Disposal of Minibuses as set out in Appendix 1.
• approves the application process and assessment criteria for community
groups applying to take ownership of an end of operational life minibus
within Council service as set out in Appendix 2.
• approves the use of up to £50k from the Anti Poverty Measures Fund in
earmarked reserves to support any required repair work to minibuses for
MOT purposes before transfer to community groups. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background 
• Section 5: Proposal 
• Section 6: Conclusion 
• Appendices 1, 2, 3, 4 and 5 
4. BACKGROUND 
4.1 It was reported to Finance and Resources Committee on 12 June 2024 that
the disposal of minibuses currently falls under the existing general policy for
the disposal of Fleet & Mechanical Equipment approved as an appendix to the
Fleet & Mechanical Equipment Asset Management Plan agreed by Strategic
Policy & Resources Committee in June 2015 (report 15/255 refers). The
current policy was last reviewed in 2022 and was attached for information to
the F&R Cttee report on 12 June. 
8
Page 105 of 132

Page 106

4.2 It was agreed at Committee that the policy position of disposal at public
auction be changed to allow minibuses which are deemed to be in suitable
condition to be transferred to community groups. This innovative approach
would remove a barrier to some groups, particularly those in rural areas, who
may not otherwise have access to their own transport solution with positive
links to help mitigate some of the issues around transport poverty and social
connectivity etc. 
4.3 There are 14 minibuses due to reach end of operational life within Council
service this financial year as set out in Appendix 5, 3 of which have already
been removed from service and currently retained at Friarton Depot pending
the outcome of this report. 
4.4 The determination of what constitutes ‘suitable condition’ referred to in 4.2
includes consideration of the following factors which are applied by our
experienced workshop staff to every vehicle which has reached the end of its
operational life within Council service; 
• Cost of parts and labour
• Downtime
• Age of vehicle
• Condition of external body (corrosion/ defects)
• Condition of internal devices (damage or defects to seats etc)
• Condition of paintwork
• Cost of repair versus market value of vehicle 
4.5 It is known amongst Members that there are several community groups who
could potentially be interested in receiving and operating an ex-PKC minibus.
It was acknowledged therefore that some form of adjudication process would
be required if more than one group expressed an interest in taking ownership
of a minibus, further detail of which is set out in this report. 
4.6 The draft minibus disposal policy was discussed at a Strategic Investment
Advisory Group (SIAG) meeting held on 3 September 2024, input from which
has been incorporated into the final version presented to Committee today. 
5. PROPOSAL 
5.1 That the proposed Minibus Disposal Policy as set out in Appendix 1 be
approved as an amendment to the overarching Fleet & Mechanical Equipment
Disposal Policy to enable the transfer of end of operational life minibuses
within Council service in a suitable condition to community groups. 
5.2 That the determination of what constitutes ‘suitable condition’ referred to in 4.4
above be considered alongside the SIAG recommendation that the Anti-
Poverty Measures Fund from earmarked reserves be used to support repair
costs for MOT purposes before transfer. It should be noted that all future
ownership responsibilities including minibus repairs, maintenance and
servicing costs etc are to be borne by the community group going forward with
no recourse to the Council. 
Page 106 of 132

Page 107

5.3 It is proposed that a working repair budget principal of up to £5k per vehicle
be applied with flexibility on a case by case basis as required. This decision
would be made by Fleet Services within the overall funding resource approved
by Committee. 
5.4 An assessment /adjudication of the community benefit and need for a minibus
by a community group is to be performed based on the criteria shown in
Appendices 2, 3 and 4. This assessment and decision making to be carried
out by PKC Community Services, supported by Fleet Services for the
communication and management of the process. 
5.5 A communications plan for community groups be set out describing the
application process, assessment criteria and list of vehicles approaching end
of operational life within Council service. 
5.6 That the revised disposal policy be applied to minibuses only and that a trial
period to test the new arrangement be put in place. It is proposed that the trial
period should allow sufficient time to allow community groups to run
minibuses to assess the reliability of vehicles and capture the wider impacts
and outcomes of the initiative. It is proposed that feedback should be sought
from community groups after 3 months and then again after 6 months from the
date of transfer. 
6. CONCLUSION 
6.1 This is a well-intentioned initiative targeted at helping Community Groups. The
demand for more forms of community transport has been increasing in recent
years and these proposals have the potential to create increased public value;
presenting PKC with an opportunity to work in partnership with communities to
help develop more innovative local transport solutions and impact positively
on transport poverty and social connectivity. 
Authors
Name  Designation Contact Details
Fraser Crofts  Strategic Lead –
Environment & Infrastructure 
01738 475000
EPLCommitteeReports@pkc.gov.uk 
Nigel Taylor Direct Services Manager –
Economy, Place & Learning 
Pat Taggart Fleet Manager – Economy,
Place & Learning 
Approved 
Name Designation Date
Fraser Crofts  Strategic Lead - Environment &
Infrastructure
9 September 2024 
Page 107 of 132

Page 108

APPENDICES
Appendix 1 – Policy for the Disposal of Minibuses
Appendix 2 – Community Minibus Information and Criteria
Appendix 3 – Community Minibus Application
Appendix 4 – Community Minibus Scoring Matrix
Appendix 5 – Minibuses due to reach end of operational Council service 24/25 
Page 108 of 132

Page 109

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications  Yes / None
Corporate Plan   Yes
Resource Implications    
Financial   Yes
Workforce  Yes
Asset Management (land, property, IST)  Yes
Assessments    
Equality Impact Assessment  No
Strategic Environmental Assessment   No
Sustainability (community, economic, environmental)  Yes
Legal and Governance   Yes
Risk  Yes
Consultation   
Internal   Yes 
External   Yes 
Communication   
Communications Plan   Yes 
1. Strategic Implications 
Corporate Plan    
1.1 This report supports the objectives within the new Corporate Plan:  
(i) Working in partnership with communities
(ii)  Tackling poverty
(iii) Developing a resilient, stronger and greener local economy 
(iv) Tackling climate change and supporting sustainable places  
2. Resource Implications 
Financial    
2.1 The loss of auction sale income from this initiative was considered at F&R
Committee on 12 June but it was agreed that this should be considered in the
context of the wider community benefit from having access to transport at a
local level with no upfront cost to community groups. It was considered at
Committee that the potential level of reduction in income receipt is minimal in
the context of the Council’s longer term vehicle replacement programme and
the associated impact on loan charges would be contained in the Fleet
revenue account. 
2.2 Approval is sought for the use of up to £50k from the Anti Poverty Measures
Fund in earmarked reserves to support any required repair work to minibuses
for MOT purposes before transfer to community groups.
Page 109 of 132

Page 110

2.3 Note that PKC will have no further involvement with or responsibility for any
vehicle once it is transferred to a community group including future
maintenance, repair or servicing costs.  
Workforce 
2.4 There are no direct workforce implications arising from this report.    
Asset Management (land, property, IT) 
2.5 There are direct vehicle asset management implications, as noted throughout
the report.    
3. Assessments 
Equality Impact Assessment    
3.1 There are no Equality Impact Assessment issues arising other than the
potential benefits to those community groups acquiring minibuses from PKC.    
Strategic Environmental Assessment    
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. There are none arising from this proposal.    
Sustainability    
3.3 The proposals in this report support the Council’s policy objectives with regard
to sustainability.   
Legal and Governance 
3.4 Governance arrangements for the transfer of end of operational life minibuses
within Council service to community groups are set out in the body of the
report and Appendices.  
Risk 
3.5 There is the potential for reputational risk if the vehicles prove not to reliable
and/or do not deliver on the expected outcomes from transferring minibuses
to community groups. As stated in para 5.2 of the report, it should be noted
that all future ownership responsibilities including minibus repairs,
maintenance and servicing costs etc are to be borne by the community group
going forward with no recourse to the Council. 
Page 110 of 132

Page 111

4. Consultation 
Internal  
4.1 The proposals in this report have been discussed with officers from the
various relevant Council Services including Finance, Legal and
Procurement.  Members on the Strategic Investment Advisory Group have
also had the opportunity to make comment on the proposals.  
External  
4.2 There has been contact between some community groups and Council
Officers and Members. This has established that there is interest in end of use
minibuses by community groups.     
5. Communication 
5.1 This would take place with all parties once the report has been
considered/approved.   
Page 111 of 132

Page 112

Page 112 of 132

Page 113

APPENDIX 1
Perth and Kinross Council
Policy for the Disposal of
Minibuses
September 2024
DATE VERSION APPROVED BY
1 December 2023 1 P Taggart (Fleet
Manager)
21 February 2024 2 P Taggart (Fleet
Manager)
10 September 2024 3 (After Siag Meeting) P Taggart (Fleet
Manager)       
1. Introduction 
In accordance with the Perth and Kinross Council (PKC) Fleet and Mechanical
Equipment (FaME) asset management plan assets Policy 2022, it was decided that
a separate disposal policy to incorporate the disposal of Minibuses should be
created. This policy outlines how assets which fall within the Minibus category should
now be disposed of.   
2. Scope
A minibus is defined as:
‘A small vehicle that is capable of carrying multiple people between 9 and 16
passengers at any one time and requires maintenance, calibration and/or a safety &
inspection test at no more than 13 weekly intervals’. 
3. Aims and objectives of this policy
To ensure that any minibus owned by PKC which are declared surplus or end of
operational life within Council service and in a suitable roadworthy condition as
decided by Fleet Services (FS), can be further used by relevant Community Groups
(CG) within the PKC boundary area. 
8
Page 113 of 132

Page 114

4. Surplus 
Assets are identified as surplus in one of four ways: 
1. As part of a replacement programme.
An ongoing replacement programme is currently in place for all assets. 
2. When they are unserviceable and beyond economical repair.
Unserviceable fleet and mechanical equipment is deemed to be beyond
economical repair by Fleet Management technical staff or categorised as a “write
off” by the council’s insurers. This is when the decision is made by FS whether the
vehicle should remain in active service by PKC staff or passed to a CG for further
use.   
3. When they are deemed not fit for purpose.
A minibus can be declared not fit for purpose by FS technical staff, the budget
holder, Corporate Health & Safety staff, relevant statutory bodies; Driver and
Vehicle Standards Agency (DVSA), Department for Transport (DfT) or through a
combination of listed parties. 
4. When their function is surplus to requirements.
Assets which are surplus to requirements are identified by individual services
budget holders or with minibuses, when PKC has decided that these may benefit
CG in the PKC area. Once identified as surplus or redundant the asset will be
assessed against other Council and Service needs prior to disposal. 
Requirements also to be considered include:
• re-allocation to another PKC service area if the previous user finds the 
minibus is surplus to requirements for that service. 
• spare Pool use 
Assets declared surplus should be communicated to all relevant parties as noted in
this policy. 
If a decision is made for a minibus to be disposed of, this should be passed to a CG
in accordance with the approved minibus disposal policy. If a CG is to be “gifted” the
vehicle, the undernoted process must be strictly adhered to, and all associated
ownership passed from PKC to that CG once agreed. 
5. Disposal 
Disposal includes any activity associated with the disposal and decommissioning of
an asset identified within the main FaME asset management plan. 
All assets that are not re-used have a sell on value and should be taken through the
processes detailed in the FaME Disposal Procedure. This means the asset would be
disposed of at auction. As with an uneconomic to repair minibus, this would be
Page 114 of 132

Page 115

disposed of at auction and not allocated to any CG due to its poor and unroadworthy
condition. 
The following factors must be considered prior to the disposal of any minibus
belonging to PKC: 
1.  Notice in writing of interest and intention to acquire a minibus is provided by
community groups to PKC Community Services – a process and communication
and engagement plan to be introduced to cover this.  
2. Inspection report on condition of the minibus is made available to any interested
community groups aligned with PKC. 
3. Visual inspection of the minibus is arranged by PKC Fleet Services (FS) for
interested community groups to check on the condition of the asset prior to
disposal/ transfer. 
4. An assessment of the community benefit and need for the minibus by a
community group to be performed by PKC Community Services based on the
criteria shown in Appendices 2, 3 and 
5. Fleet Services will coordinate and be present at all community group minibus
inspections – the arrangements for this will be made by FS.      
6. Test drives will be available to community groups who have been successful in
their bids following adjudication by PKC Community Services.    
7. The minibus must be in a roadworthy condition with a minimum of 6 months to one
year MOT in place – FS will manage this.  
8. All future repairs, maintenance, servicing and MOTs would be required to be
arranged by the new owner / community group. PKC would not undertake future
work.  
9. A verbal update on the minibus service history will be provided by FS. A service
history print from KEY 2 will also be provided on request.  
10.The established principle of “sold as seen” would in this new arrangement
become “transfer as seen” in line with other Fleet and Mechanical Equipment
asset disposals.  
11.PKC will have no liability for any minibus “transferred as seen” in line with 
its current arrangement when disposing of all other Fleet and Mechanical
Equipment assets.  
12.PKC would not accept the return of a transferred minibus under any circumstance
and there would be no recourse nor liability to PKC once the transfer has taken
place. 
Page 115 of 132

Page 116

13.If there is competition by community groups to acquire a minibus, there would be
an adjudication by PKC Community Services based on consideration of the
parameters described in Appendix 2 below. 
14.There would be no warranty in place when the asset is transferred to the interested
community group in line with the process when a vehicle is sent to auction. 
15.PKC reserves the right to refuse to transfer of any minibus if its condition is poor
and not regarded as being roadworthy or if the vehicle is required for “pool use”.  
16.FS will agree with Legal and Finance Services on the specific assets within this
category that will be disposed of in this way.  
6. Finance 
Monies from the sale of assets are normally applied to offset the cost of new asset
purchases. This reduces the amount of money required to be borrowed to finance
the future purchase of assets. However, this specific disposal process aligned with
minibuses means that there will be no funds for the handing over of the minibus as
they will be “gifted” to relevant CG’s that have been approved by SIAG.  
7. Governance 
The disposal of surplus and redundant assets will be managed in accordance with
the Local Government in Scotland Act 2003 principle of securing Best Value.  
8. Retention policies
FaME disposal records must be retained on file for 7 years in line with Health and
Safety instructions. The same will be in place for the minibus disposal policy.  
9. Review Policy 
This Policy will be reviewed on an annual basis to ensure that it reflects the changing
needs of Perth & Kinross Council and its employees. The review process, although
led by the Capital Investment & Asset Management Team, will include a wider
consultation with Fleet Management. 
Page 116 of 132

Page 117

APPENDIX 2 
PKC have recognised that there are a number of community groups who could be interested in
receiving and operating an ex-PKC minibus. There are 14 minibuses that are expected to reach
the end of their operational life within Council service in 2024/25.  We recognise that although
these minibuses will no longer be used by PKC, community groups may be able to use these
vehicles to enhance their service provision and provide community benefit. 
Community groups are invited to view the minibuses and can do so my contacting
cld@pkc.gov.uk. 
Minibuses will all come with a 6 – 12 month MOT certificate and an inspection report on condition
of the vehicle will be made available to any interested community groups. Otherwise, vehicles are
‘transferred as seen’. Test drives will be available for successful groups. All future repairs,
maintenance, servicing and MOT etc would be required to be arranged by the transferee. PKC
maintain no liability for the vehicle once ownership is transferred.   
A verbal service history update will be provided along with a service history print out if required. 
There is no application deadline. Applications are welcome at any time and will be considered
when a vehicle is available. When a vehicle becomes available, a deadline for applications for that
vehicle may be introduced.  
Application Criteria 
1. Applications should be made on behalf of a constituted community group that is based in
Perth and Kinross. Groups can be constituted but unincorporated, or have one of the
following legal structures: 
• Scottish Charitable Incorporated Organisation
• Community Investment Company
• Community Benefit Society
• Company Limited by Guarantee 
2. Applications will not be accepted from:
• Private/for profit businesses
• Individuals 
3. Groups must demonstrate what benefit having a minibus would provide to their community.
Where possible this should link to PKC’s vision and priorities. 
8
Page 117 of 132

Page 118

4. Applicants must demonstrate that they have a plan in place to manage ongoing costs of the
vehicle, this may include applying for external funding or use of existing funds / income. 
5. Groups should provide information on whether they have trained drivers, or how they will
train drivers. MIDAS training will be required for all drivers and is available locally. 
6. Groups will be asked to provide feedback after 3 months then 6 months from date of
transfer on the use of the vehicle, any issues experienced and the benefits it has provided
to the community. 
Page 118 of 132

Page 119

APPENDIX 3 
PKC are offering to transfer ownership of minibuses which are no longer used by the
Council. By doing this we seek to provide community benefits to groups across the Perth
and Kinross area. 
Application criteria and deadlines can be found here. (Link) 
For assistance, please email cld@pkc.gov.uk or phone XXXXXXXX 
1. Your Group
2. Type of Group 
Name of Group 
Location
Which area does your group cover?
(e.g. village, neighbourhood,
Community Council area etc). 
What size of vehicle do you require? 
Registration of vehicle applying for (if
known) 
Type of Group
i.e. SCIO, Constituted Group, Company
Limited by Guarantee, CIC 
Constitution
Please attach a copy of your group’s constitution or articles of association to this
application or provide a link to where they can be found online. 
Purpose of your group
Please summarise the main purpose
and aims of your group. 
8
Page 119 of 132

Page 120

3. Your Minibus Needs
3.1 Please outline how the need for the minibus has been identified 
3.2 Please outline how you would plan to use the minibus (number of passengers, expected
purpose, mileage and frequency of trips) 
3.3 Please detail the benefit that would be provided to the community by your group’s
ownership of a minibus. 
3.4  What other transport does your Group have available and how is it used? Has your Group
previously received/ hired transport from PKC (please give details)? 
4. Your Minibus Maintenance and Care 
4.1  Do you have a space where you can park your minibus? Please give details below 
Page 120 of 132

Page 121

4.2  Please indicate how you might finance ongoing maintenance of the vehicle including
MOTs, Servicing, unexpected repairs, and insurance? Having identified options may be
useful but is not essential at this stage. 
4.3  Minibus drivers require MIDAS training. Do you have anyone within your organisation that
would already be qualified to drive the minibus? If yes, please detail below. Having pre-
trained drivers may be useful but not essential at this stage. 
5 Declaration 
To the best of my knowledge the information contained in this application is accurate. 
If a minibus is granted to my organisation as a result of this application, it will be used for
the purposes outlined in this application. 
The information provided by you will be used by Perth and Kinross Council solely to contact
you about your application. Contact details will not be disclosed to third parties. The Council
may check information provided by you, or information about you provided by a third party,
with other information held by us. We may also get information from certain third parties or
share your information with them to verify its accuracy, prevent or detect crime, or protect
public funds where required by law. 
Signature:
Print Name:
Position in Group:
Date:
If you are submitting your form electronically you can attach a picture image of your signature
in the box below. 
Please send completed applications by email to cld@pkc.gov.uk or by post to: 
Page 121 of 132

Page 122

Community Learning and Development Team
Perth & Kinross Counsil
Council Building
2 High Street
Perth PH1 5PH 
Page 122 of 132

Page 123

APPENDIX 4 
The purpose of this scoring matrix is to support Officers to make a recommendation to award an ex-PKC minibus to a community group. The
Scoring matrix is intended to be a guide only and is not a final decision-making tool. 
In order to give weighting to an application the following scores are applied:
Very
Strong 
10 points
Strong  8 points
Moderate   5 points
Weak  2 points
Poor  0 points 
Each of the questions for scoring also include a section where Officers can note any particular points they wish to make, including any points of
clarification or requests for additional information. 
8
Page 123 of 132

Page 124

This scoring matrix is being completed in connection to the application from __________________________________________.
Matrix Completed by _____________________________ (officer name) from _____________________________ (officer service) 
Question Score Comments
Very
Strong
10
Strong 
8
Moderate 
5
Weak 
2
Poor 
0
To what extent has the applicant
demonstrated a clear need for the
minibus?      
To what extent has the applicant
demonstrated that they have access to
the necessary funds to maintain the
minibus?      
To what extend has the applicant
demonstrated that they have trained
drivers?      
To what extend has the group
demonstrated that they have the
resources to train future drivers?      
To what extent has the applicant
identified a possible benefit to their
community?             
Page 124 of 132

Page 125

Additional comments: 
In principle do you feel that the application should be: 
Approved:
Reasons for approval 
Refused:
Reason for refusal 
Page 125 of 132

Page 126

Page 126 of 132

Page 127

APPENDIX 5
Minibuses due to reach end of operational Council service 24/25 
8
Page 127 of 132

Page 128

Page 128 of 132

Page 129

Perth and Kinross Council 
EMPLOYEES JOINT CONSULTATIVE COMMITTEE 
PART 1: CONSTITUTION AND FUNCTIONS 
1. Title 
The Committee will be called “Perth & Kinross Council Employees Joint
Consultative Committee for Local Government Employees”, subsequently
referred to as the “JCC”. 
2. Representation 
(a) The JCC will comprise: 
Perth and Kinross Council 
(i) Four members of the Council who will be appointed by the
Finance & Resources Committee. 
(ii) Director (Economy, Place and Learning), Director (Strategy
People and Resources) Chief Officer, Health and Social Care
Partnership; Strategic Lead – Property Services. 
Other officers or their representatives may be requested by the
Chairperson to attend any meeting where there are particular issues on
the agenda about which they have specialist knowledge. 
Trade Unions 
Representatives of those trade unions recognised by the National
Council on the following basis:  
(i) 12 Members of trade unions (3 of these will be members of
teaching trade unions) 
UNISON – Unite the Union - GMB – EIS – SSTA - NASUWT 
(ii) Members of teachers trade unions are present for Health and
Safety issues only 
(iii) Two non-union representatives shall be appointed to the
Committee for Health and Safety issues only 
Provision will be made for any other union to be represented when a
subject concerning their members is to be discussed.   
Report No. 24/264
9
Page 129 of 132

Page 130

(b) If a member of the JCC ceases to be a member or officer of the
Council or of the trade union which he/she represents, then their
membership of the JCC will cease. 
(c) If a member or lead officer is unable to attend a meeting, a substitute
will attend in their place. 
(d) Any such vacancy which arises on the JCC, for whatever reason, will
be filled by a member or officer of the Council or trade union as
appropriate.   
(e) The Joint Secretaries of the Joint Negotiating Committee for Teaching
Staff may also be invited to attend, or be represented, in the capacity of
observers. 
3. Chairperson 
A Chairperson and a Vice-Chairperson must be appointed by the JCC at its
first meeting every two years.  An officer of the Council cannot be appointed
as Chairperson or Vice-Chairperson.  The Chairperson appointed should be a
Trade Union representative and the Vice-Chairperson should be a member of
the Council. 
4. Officers 
(a) The JCC will appoint Joint Secretaries, one to be nominated from each
side, and any other officers as required. 
(b) The Corporate Human Resources Manager and Health and Safety
Team Leader (both Strategy, People and Resources) will act as
Advisers to the JCC. 
5. Functions 
The functions of the JCC will be to: 
(a) Establish regular consultation and negotiation between the Council and
its employees, to prevent differences and to address these if and when
they arise. 
Issues of individual discipline, grievance, grading, promotion and terms
and conditions will not be included within the scope of the JCC. 
(b) Consider any relevant matter referred to it by the Finance and
Resources Committee or by the unions.  In this respect, each party will
have the right to invite any officer or member of the Scottish Joint
Council or any person(s) to attend a JCC meeting but only to act in an
advisory capacity. 
Page 130 of 132

Page 131

(c) Consider and make recommendations to the Finance and Resources
Committee where appropriate concerning any issues of common
interest.  Such areas to include: welfare of staff; local conditions of
service; education and training, health and safety, wellbeing, corporate
property compliance and housing compliance.  The above being
subject to the provision that matters relating to individual employees
are neither discussed nor referred to the other Committees. 
(d) Health and safety quarterly reports will include an overview of any
external health and safety reports on incidents dealt with at service
level. 
(e) Consider and make proposals regarding the best methods to be
employed in improving the organisation and cost-effective delivery of
Council Services. 
(f) The review of accident and ill health incidents, statistics and trends so
reports can be made to management. The consideration of reports
provided by the Strategic Lead – Strategy, People and Resources and
the Council’s Health and Safety Advisor.   
(g) The examination of performance review reports where issues cannot
be resolved at the Service Health and Safety Committees. 
(h) To review the Council Occupational Health and Safety policy, topic
specific Management Arrangements and Guidance while raising
awareness of health and safety communications, promotion and
employee participation, through participating in joint employee-
employer health, safety and wellbeing initiatives. 
(i) Refer any matters which the JCC considers to be more than of local
importance to the Scottish Joint Council and inform the Scottish Joint
Council of any recommendations in this respect. 
PART 2: RULES AND REGULATIONS 
1. Meetings 
The Committee shall meet quarterly. A timetable of meetings will be published
annually for the forthcoming year. 
A meeting may be cancelled if there is no business to transact.  Additional
meetings of the JCC may be called by the Chairperson or Vice-Chairperson at
any time. 
Any member unable to attend a meeting may send a substitute to attend. 
Page 131 of 132

Page 132

2. Quorum 
The quorum of the JCC will be four provided that the members of the Council
and the trade unions are represented. 
3. Agenda 
The agenda or issues to be discussed at any meeting of the JCC must be
itemised and stated within the notice of calling the meeting. 
Democratic Services must receive items for inclusion on the agenda at least
10 days before the meeting. 
An agenda and papers will be issued to all members at least 7 days prior to
the meeting. 
Items received by the given deadline or considered a matter of urgency will be
included on the agenda at the discretion of the Chairperson in conjunction
with the Vice-Chairperson, with reference to the function and objectives of the
Committee. 
4. Minutes 
The minutes of the JCC will be agreed between the lead officers and will be
circulated to all members of the JCC for approval with the papers for the next
meeting. Thereafter the minutes will be circulated to the next available
meeting of the Finance and Resources Committee. 
5. Facilities and Services 
Democratic Services will provide administrative support to the JCC. 
The Council will afford the necessary facilities for the representatives of the
trade unions to attend meetings of the JCC. 
6. Other Matters 
For the purpose of determining order of debate and other questions not
provided for within this Constitution, the Standing Orders of the Council will
apply, with necessary modifications at all JCC meetings. 
This Constitution may be varied or modified by agreement between the
relevant parties. 
The JCC shall have no executive powers and shall act as a consultative and
advisory body only.  The Council shall not be bound to approve or act upon
JCC recommendations.  The JCC shall not make recommendations which
conflict with the policy or recommendations of the appropriate Scottish Joint
Council.
Page 132 of 132