Agenda Document Pack - Finance and Resources Committee - 24/04/2024

Perth and Kinross Council · 24 April 2024
Back to Finance and Resources Committee — 24 April 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
18/04/2024 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 24 April 2024 at 14:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Stewart Donaldson  (Convener)
Councillor Grant Laing  (Vice-Convener)
Bailie Chris Ahern
Bailie Alasdair Bailey
Councillor Peter Barrett
Councillor Andy Chan
Councillor Dave Cuthbert
Councillor Eric Drysdale
Councillor John Duff
Councillor David Illingworth
Provost Xander McDade
Councillor Tom McEwan
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Page 1 of 104

Page 2

Page 2 of 104

Page 3

Finance and Resources Committee 
Wednesday, 24 April 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE FINANCE AND RESOURCES
COMMITTEE OF  31 JANUARY 2024 FOR APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 24/129) 
9 - 10 
5 REVENUE BUDGET 2023/24 - UPDATE NO. 4
Report by Strategic Lead - Finance and Business Support (copy
herewith 24/130) 
11 - 50 
6 COMPOSITE CAPITAL BUDGET 2023-28 & HOUSING
INVESTMENT PROGRAMME 2023-28 - MONITORING REPORT
NO. 4
Report by Strategic Lead - Finance and Business Support (copy
herewith 24/131) 
51 - 86 
7 TREASURY ACTIVITY AND COMPLIANCE REPORT 2023/24 - 6
MONTHS TO 31 MARCH 2024
Report by Strategic Lead - Finance and Business Support (copy
herewith 24/132) 
87 - 104 
Page 3 of 104

Page 4

Page 4 of 104

Page 5

FINANCE AND RESOURCES COMMITTEE 
Minute of hybrid meeting of the Finance and Resources Committee held in the
Council Chamber, 2 Hight Street, Perth on Wednesday 31 January 2024 at 2.00pm. 
Present: Councillors S Donaldson and G Laing, Bailie C Ahern and Bailie A Bailey,
Provost X McDade, Depute Provost Parrott, and P Barrett, A Chan, D Cuthbert,
E Drysdale, J Duff, D Illingworth, T McEwan, J Rebbeck, C Shiers and C Stewart. 
In Attendance: T Glen, Chief Executive; K Donaldson, Chief Operating Officer;
C Mailer, Director (Strategy, People and Resources); S Devlin, Executive Director
(Education and Children’s Services); M Butterworth, F Crofts, C France, E Ritchie,
S Coyle, J Ferguson and F Robertson (Communities); G Boland and C Palmer
(Education and Children’s Services); L Simpson, S MacKenzie, S Walker,
P Johnstone, L Stewart, V Robertson, K Molley, A Brown and R Ramsay (all
Corporate and Democratic Services); H Smout, Culture PK. 
Councillor S Donaldson, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
The Convener welcomed all those present to the meeting. 
2. DECLARATIONS OF INTEREST 
There were no declarations made in terms of the Councillors’ Code of
Conduct. 
3. MINUTE OF PREVIOUS MEETING 
The minute of meeting of the Finance and Resources Committee of
22 November 2023 was submitted and approved as a correct record. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved:
The status of action in the Outstanding Business Statement (24/38) be noted
and completed actions removed accordingly. 
IN TERMS OF STANDING ORDER 11, THE COMMITTEE AGREED TO VARY THE
ORDER OF BUSINESS. 
5. PROCUREMENT UPDATE 
There was submitted a report by the Strategic Lead – Legal and Governance
(24/39) setting out (1) the Annual Procurement Report for financial year 2022/23;
and (2) the planned procurement activity for future years. 
Resolved:
(i) The publication of the Procurement Annual Report 2022/23 be approved.
(ii) The record of tenders accepted during 2022/23 under the Council’s scheme of
delegation be noted.
(iii) The planned procurement activity, as far as known for future years, be noted.
3
Page 5 of 104

Page 6

(iv) The monies provided to third parties under the Code of Guidance for
Following the Public Pound during 2022/23 be noted. 
6. FLEXIBLE WORKING FRAMEWORK 
There was submitted a report by the Corporate Human Resources Manager
(24/42) (1) seeking approval of the Framework to formalise hybrid working as a
workstyle and ensure a fair and consistent approach that is focussed on operational
and customer need; and (2) asking the Committee to note that the Framework, and
associated operation guidance, will continue to be updated to reflect new employee
rights which are at different stages of the UK parliamentary approval process. 
Resolved:
(i) The core Flexible Working Framework, as set out in Appendix 1 to Report
24/42, which will be supported by operational guidance, be approved.
(ii) It be noted that with effect from 1 April 2024 a revised Hybrid working
approach will establish the requirement for a minimum level of attendance in a
workplace of normally 2 days per week. 
THE VICE-CONVENER LED ON THE FOLLOWING ITEM. 
7. REVENUE BUDGET 2023/24 – UPDATE NO. 3 
There was submitted a report by Strategic Lead – Finance & Business
Support (24/40) providing an update on progress with the 2023/24 General Fund
Revenue Budget based upon the October 2023 ledger, updated for any subsequent
known material movements; and the projected financial position of the Housing
Revenue Account. 
Resolved:
(i) The contents of the Report 24/40, be noted.
(ii) The projected outturn for General Fund Services, set out in Section 5 and
Appendix 1 and 2 of Report 24/40, be noted.
(iii) The projected outturn for Corporate Budgets and Perth and Kinross
Integration Joint Board, set out in Section 6 of Report 24/40, be noted.
(iv) The funding update provided in Section 7 of Report 24/40, be noted.
(v) The projected outturn for the Housing Revenue Account, which is summarised
in Section 8 and Appendix 4 of Report 24/40, be noted.
(vi) The adjustments to the 2023/24 Management Revenue Budget, detailed in
Sections 8, 9, 10 & 11 and Appendices 1, 2, 4, 5, 6 and 7 of Report 24/40, be
approved.
(vii) The financial risks, set out in Section 12 and Appendix 8 of Report 24/40, be
noted. 
THE CONVENER LED ON THE FOLLOWING ITEM. 
8. COMPOSITE CAPITAL BUDGET 2023/28 & HOUSING INVESTMENT
PROGRAMME 2023/28 – MONITORING REPORT No.3 
There was submitted a report by Head of Finance (24/41) (1) providing a
summary position to date for the 5-year Composite Capital Budget and the 5-year
Page 6 of 104

Page 7

Housing Investment Programme for 2023/24 to 2027/28 and; (2) seeking approval
for adjustments to the programmes. 
Resolved:
(i) The contents of Report 24/41, be noted.
(ii) The proposed adjustments to the five-year Composite Capital Budget 2023/24
to 2027/28, as set out in Sections 5 and 6 of Report 24/41 and summarised in
Appendices I and II to Report 24/41, be approved.
(iii) The proposed adjustments to the Housing Investment Programme Budget
2023/24 to 2027/28, as set out in Section 7 of Report 24/41 and summarised
in Appendix III to Report 24/41, be approved.
Page 7 of 104

Page 8

Page 8 of 104

Page 9

FINANCE AND RESOURCES COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 24/129) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
21. 22 Nov 23 Revenue Budget
2023/24 – Update
No. 2
To increase scrutiny and
assurance,
representatives from
Tayside Contracts be
invited to future meetings
of Perth and Kinross
Council’s Scrutiny and
Performance Committee.
An Elected Member Briefing
Session on the structure of
Tayside Contracts/Minute of
Agreement/Governance
Arrangements has been
arranged for members on
23 April 2024. 
Representatives from
Tayside Contracts have
been invited to attend the
Scrutiny and Performance
Committee on 24 April
2024.   
COMPLETED
Legal and
Governance
24 Apr 24 24 Apr 24
22. 23 Mar 23 
Executive
Sub-
Committee
Revenue Budget
2022/23 –
Tayside Contracts
Following the Executive
Sub-Committee on 23
March 2023, the
Convener was requested
to write to Tayside
Contracts suggesting that
they set up a
The Convener has not
received a response from
Tayside Contracts. 
NOT COMPLETED
Thomas Glen TBC TBC
4
Page 9 of 104

Page 10

No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
Performance/Scrutiny
Sub-Committee to enable
more regular in-depth
monitoring of
performance. 
The Convener wrote a
letter to Tayside
Contracts. 
23. 31 Jan 24 Procurement
Update
Further information
regarding the funding
received by Scottish
Police Authority
contained within the
Following the Public
Pound report be shared
with members. 
Email response was issued
to members. 
COMPLETED
Legal and
Governance
24 April
2024
24 April
2024
24. 31 Jan 24 Procurement
Update
To share a link to the
Contracts Register on the
Public Contracts Scotland
website.
Email response was issued
to members. 
COMPLETED
Legal and
Governance
24 April
2024
24 April
2024 
Page 10 of 104

Page 11

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
24 APRIL 2024 
REVENUE BUDGET 2023/24 – UPDATE NO. 4 
Contact Officer: Scott Walker, Strategic Lead – Finance & Business Support
(Report No. 24/130) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2023/24 General Fund
Revenue Budget based upon the January 2024 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected under spend on the 2023/24 General Fund
Management Budget is £1.373 million (see Appendix 1). 
1.3 The report also seeks approval for several adjustments to the 2024/25
Revenue Budget approved by Council on 28 February 2024. 
2. RECOMMENDATIONS 
The Committee is requested to: 
A. note the contents of the report. 
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2. 
C. note the projected outturn for Corporate Budgets and Perth & Kinross
Integration Joint Board set out in Section 6. 
D. note the funding update provided in Section 7. 
E. note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 4. 
F. approve the adjustments to the 2023/24 Management Revenue Budget
detailed in Sections 8, 9, 10 & 11 and Appendices 1, 2, 4, 5, 6 & 7. 
G. note the financial risks set out in Section 12 and Appendix 8. 
H. approve the adjustments to the 2024/25 Management Revenue Budget
detailed in Section 13 and Appendix 9.  
5
Page 11 of 104

Page 12

3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 2023/24 Additional Funding
Section 10 2023/24 Virements
Section 11 2023/24 Movements in Reserves
Section 12 Financial Risks
Section 13 Adjustments to 2024/25 Revenue Budget
Section 14 Conclusions 
4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2023/24 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the January 2024 ledger,
updated for any subsequent known material movements. 
4.2 The budget total reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the 2023/24 Final Revenue Budget on
1 March 2023 (Report No. 23/72 refers).  In addition, adjustments approved
by the Council on 4 October 2023 (Report No. 26/268 refers), the Finance &
Resources Committee on 26 April, 13 September and 22 November 2023 and
31 January 2024 (Report Nos. 23/120, 23/242, 23/315 and 24/40 refer) and
Executive Sub-Committee of the Finance & Resources Committee on 24 July
2023 (Report No. 23/219 refers) are reflected in Appendix 1 (Column 2). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 The Service Budget projections included within this section and Appendix 1
through to 8 have been prepared based on the Council’s previous structure. 
Going forward, future reports will reflect the new structure. 
5.2 The total net projected under spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £2.543 million which represents
0.7% of total net Service expenditure. 
5.3 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
5.4 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.5 All Council Services are over achieving on approved levels of slippage. 
Whilst there is a financial impact of this which is reflected in the projected
outturns included in this report, there may be unintended consequences in
Page 12 of 104

Page 13

terms of performance, delivery of strategic objectives and impact on the
remaining workforce. 
5.6 There also remains a risk that the Council continues to experience increases
in costs over the short to medium term that are higher than budgeted inflation
levels.  This is already being seen in the cost of the materials required by
property and housing maintenance teams.  Going forward, this may continue
to have an impact on projected outturns and future years’ budgets. 
Education & Children’s Services 
5.7 The projected outturn for Education & Children’s Services excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
anticipated to be £2.761 million or 1.1% less than budget – a movement of
£1.725 million on the position last reported to Committee.  The individual
elements contributing to this position are summarised in the following table
and narrative. 
Function Projected Outturn Movement 
£’m % £’m
Education Services Under spend (1.008) (1.7) (0.604)
Children, Young People & Families Under spend (0.337) (1.4) (0.236)
Business & Resource Services Under spend (0.205) (2.8) (0.130)
Catering Services Under spend (1.211) (16.8) (0.755)
TOTAL Under spend (2.761) (1.1) (1.725) 
5.8 Within non devolved Education Services there is an increase in the net
projected under spend of £604,000.  This is primarily made up of movements
in projected staff costs due to additional slippage (£565,000).  Other projected
net under spends (£39,000) include the impact of non-domestic rates
revaluations. 
5.9 In Services for Children, Young People & Families there is an increase in
the projected under spend of £236,000.  This is made up of increases in
projected under spends on staff costs (£146,000) and non-staff related
budgets (£90,000). 
5.10 In Business & Resource Services there is an increase in the projected
under spend of £130,000 due, primarily to updated staff cost and income
projections. 
5.11 In Catering Services, there is an increase in the net projected under spend of
£755,000.  This updated projection is based upon the latest information
provided by Tayside Contracts and on further increases in school meal
uptake. 
5.12 The updated projected under spend on Catering Services is based on the
increased budget, which includes the additional contribution from Reserves of
£2.1 million approved by the Finance & Resources Committee on
22 November 2023 (Report No. 23/315 refers). 
Page 13 of 104

Page 14

5.13 The Devolved School Management Scheme (DSM) is currently projected to
under spend by £349,000 due to staff slippage and additional income, which
represents 0.3% of the overall DSM budget.  However, individual schools are
experiencing challenges in delivering approved staff slippage targets.  The
budgets for the Devolved School Management scheme are allocated by
financial year (April – March), whereas expenditure is incurred by academic
year (August – June). 
5.14 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2024.  It is anticipated that the projected under
spend on teacher and support costs of £100,000 will be carried forward to
2024/25 to meet commitments.  The budgets for the Pupil Equity Fund
scheme are allocated by financial year, whereas expenditure is incurred by
academic year. 
Communities 
5.15 The projected outturn for Communities is currently anticipated to be £373,000
or 0.5% more than budget - which represents a movement of £250,000 on the
position last reported to Committee.  This position is summarised in the
following table and narrative. 
Function Projected Outturn Movement 
£’m % £’m
Environmental & Consumer Services Over spend 1.143 3.0 0.205
Culture & Communities Over spend 0.115 0.9 -
Planning & Development Over spend 0.170 2.6 0.125
Housing Over spend 0.050 0.6 0.005
Business & Resources Under spend (1.105) (18.3) (0.585)
TOTAL Over spend 0.373 0.5 0.250 
5.16 In Environmental & Consumer Services there is an increase in the
projected net over spend of £205,000.  This is due to projected over spends in
Roads on winter maintenance and flooding and Operations on additional hires
and supplies & services, partially offset by additional income. 
5.17 The projected outturn for Environmental & Consumer Services now includes
updated information on the financial consequences of the severe weather of
October 2023.  The gross cost has increased £2.213 million, and it is
anticipated that £1.415 million will be recovered from the Scottish
Government through the Bellwin Scheme with the balance of £798,000 being
funded from unearmarked Reserves. 
5.18 In Planning & Development there is a net increase in the projected over
spend of £125,000 due, in the main, to updated projections in relation to Perth
Harbour and events income. 
5.19 Within Housing there is a net increase in the projected over spend of £5,000. 
Page 14 of 104

Page 15

5.20 Within Business & Resources there is a net increase in the projected under
spend of £585,000.  This is a combination of additional staff slippage and
income partially offset by an increase in non-staff cost budgets. 
Corporate & Democratic Services 
5.21 The projected outturn for Corporate & Democratic Services is currently
anticipated to be £228,000 or 0.6% less than budget – a movement of
£288,000 from the position last reported to Committee.  The main movements
are summarised in the following table and narrative. 
Function Projected Outturn Movement 
£’000 % £’000
Legal & Governance Services Under spend (71) (1.6) 47
Finance Over spend 118 8.9 41
Human Resources Under spend (177) (5.3) (109)
IT & Revenues and Benefits Over spend 260 2.7 91
Property Under spend (358) (1.7) (358)
TOTAL Under spend (228) (0.6) (288) 
5.22 Within Legal & Governance, Finance and Human Resources and IT &
Revenues and Benefits there has been a reduction in the net under spend of
£70,000.  This is made up of increase demand for community / crisis grants
partially offset by a combination of updated staff cost projections and income
assumptions as well as a reduction in non-staff related expenditure across the
Service. 
5.23 In Property there has been an increase in the net projected under spend of
£358,000.  This is a combination of additional fee income and reduced
expenditure on maintenance and energy. 
Chief Executive Service 
5.24 The projected outturn for the Chief Executive’s Service is currently anticipated
to be £73,000 more than budget.  These projections include one-off costs of
change associated with the Council’s new leadership structure. 
6. REVENUE MONITORING – CORPORATE BUDGETS 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Perth & Kinross Integration Joint Board 
6.2 In setting the 2023/24 final Revenue Budget, Perth & Kinross Integration Joint
Board approved the use of Reserves to deliver a balanced position.  However,
the financial position of the IJB remains challenging due to health and social
care continuing to face recruitment challenges, increasing client needs,
uncertainty over funding and rising costs particularly within prescribing. 
Page 15 of 104

Page 16

6.3 On 11 March 2024, the Audit & Performance Committee of the Perth &
Kinross Integration Joint Board received a financial update for the Health &
Social Care Partnership.  At that time there was a projected over spend of
£660,000 which is set out in Appendix 3.  Within the overall projected over
spend, £447,000 relates to social care. 
6.4 In relation to non-devolved functions there is currently a projected under
spend of £330,000 which is reflected in Appendix 1.   
Council Tax Reduction Scheme 
6.5 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.6 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements.  The following graph sets out both
variables over the current and previous six financial years.  The graph shows
a clear increase in the average weekly entitlement whereas the average
caseload has been more volatile but has returned to higher levels. 
6.7 In the current financial year, the Council is supporting approximately 8,500
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.65 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £1.150 million
which is reflected in Appendix 1. 
Page 16 of 104

Page 17

7. REVENUE MONITORING – FUNDING 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 March 2024 together
with prior year comparative figures for the previous five financial years. 
7.4 Between 2018/19 and 2022/23, the average collection figure to 31 March was
97.05%.  The actual collection figure to 31 March 2024 was 97.53% which is
an improvement of 0.48% compared to the five-year average, but a 0.42%
reduction on the comparable position in 2023. 
Page 17 of 104

Page 18

7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
7.6 Using the information on both in year and previous years collection rates,
along with the growth in the number of band D equivalent properties, the level
of Council Tax income is now projected to be £200,000 more than budget and
this is reflected in Appendix 1. 
Non-Domestic Rates 
7.7 The actual collection rate to 31 March 2024 was 96.46%, compared to
97.91% for the same period in 2022/23.  
Page 18 of 104

Page 19

8. REVENUE MONITORING – OTHER UPDATES 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 To date, no significant financial issues have been identified relating to Culture
Perth and Kinross or Perth Theatre & Concert Hall. 
8.3 Live Active Leisure finished 2022/23 with a revenue deficit of £203,000. For
2023/24, LAL initially budgeted for a deficit of £630,000.  The latest
projections, which have been considered by their own, Finance and
Governance Committee indicate a deficit of approximately £334,000.  For
2023/24, LAL are funding the budgeted deficit from their Reserves. 
8.4 LAL’s projected deficits in 2021/22 and 2022/23 did not materialise, which is
positive. However, Council officers will work with LAL throughout the year on
best/worst/mid-range projections to ensure that the Committee has more
certainty about the likely year end position for 2023/24. This will be particularly
important to support work on the ALEO budget positions and SLA awards for
2024/25 given the continuing financial challenges which face the Council. 
Housing Revenue Account 
8.5 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 4. 
8.6 Across the Housing Revenue Account there is an increase in the net
projected under spend of £170,000.  The main reasons for this movement are
updated bad debt provisions and staff cost projections, partially offset by
reduced income. 
8.7 As a result of the variances identified above Capital Financed from Current
Revenue will reduce by £280,000. 
9. 2023/24 ADDITIONAL FUNDING 
9.1 Since the 2023/24 Revenue Budget was updated on 31 January 2024 (Report
No. 24/40 refers), the Council has been advised of additional funding for the
current financial year from several sources.  To ensure that the 2023/24
Management Budget continues to reflect the operational requirements of the
Council, several adjustments are required, which are summarised below and
included in Appendix 1 and Appendix 5. 
Page 19 of 104

Page 20

Scottish Government – Revenue Support Grant: 
• Support for School Staff Training – £23,000 (Education & Children’s
Services) (ECS) 
• Summer programmes - £2,000 (ECS)
• Storm Babet - £88,000 (Communities) 
• Pay Uplifts - £1.411 million (Reserves) 
• Self-Directed Support Transformational Funding - £6,000 (Health &
Social Care) 
9.2 The Scottish Government has advised that the increase in funding identified
above of £1.530 million will be made through a redetermination of the
Council’s Revenue Support Grant.  It is therefore necessary to adjust budgets
for Education & Children’s Services, Communities, Health & Social Care and
Revenue Support Grant. 
9.3 ACTION: The Committee is asked to approve the adjustments set out at
paragraph 9.1 which is reflected in Appendix 1 (Column 3) to this report. 
Other Funding 
9.4 Other funding amounting to £1.071 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 5. 
9.5 ACTION: The Committee is asked to note the receipt of £1.071 million of
additional resources, with this funding being reflected within Education &
Children’s Services and Communities as additional grant income.  The current
projected outturn assumes that all these additional resources will be fully
expended in 2023/24 or carried forward under the terms of the grant award. 
10. 2023/24 VIREMENTS 
Contribution to/from Capital Fund 
10.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
10.2 The latest monitoring indicates a projected reduction in capital financing costs
(loan charges) of £545,000 based on capital expenditure and the latest
treasury management activity and a reduction in income of £534,000 from
interest on revenue balances due to updated interest rate projections.  This
will result in a net increase in the Contribution to the Capital Fund of £11,000
in the current financial year. 
10.3 ACTION: The Committee is requested to approve the virement of £545,000
from the Capital Financing Costs (Loan Charges) Budget and £534,000 from
Interest on Revenue Balances with a corresponding increase in the projected
Page 20 of 104

Page 21

Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 4) to this report. 
10.4 At 31 March 2023, the audited 2022/23 Annual Accounts included a Capital
Fund balance of £26.343 million.  Following the Council approval of a 1%
increase in Council Tax to be applied to the Loan Charges budget each year
from 2025/26, with the existing approved Capital Budget, the Capital Fund is
currently projected to peak in 2050/51, before gradually reducing until fully
utilised in 2062/63. 
11. 2023/24 MOVEMENTS IN RESERVES 
11.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2023 (per audited
Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2023/24, 2024/25 and 2025/26.
• The impact of proposals within this report on earmarked Reserves.
• Known commitments against earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves. 
11.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied. 
ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts 
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
11.3 Proposals involving earmarked Reserves under i. and ii. above will be advised
to Committee in summary as Council either has limited discretion or
previously approved their application.  Proposals to apply earmarked
Reserves under iii. above will include more detail for elected member
consideration. 
Balances Held for Specific (Previously Approved) Purposes 
11.4 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
The proposals listed below transfer funding to earmarked Reserves to be
applied in future years. 
• Climate Change - £110,000
Page 21 of 104

Page 22

• Workforce Management (including Transformation) - £111,000
• School Estate - £805,000 (Perth High School, Learning Estate
Investment Programme & Bertha Park High School) 
11.5 ACTION: the Committee is asked to approve the transfer of £1.026 million to
the earmarked Reserves set out above.  These adjustments are reflected in
Appendix 1 (column 5) to the report. 
11.6 Approval is also sought to draw down £236,000 for the Culture earmarked
Reserve in respect of the Stone of Destiny and opening exhibition costs. 
11.7 ACTION: the Committee is asked to approve the application of £236,000 from
the Culture earmarked Reserve to fund the upfront costs relating to the
opening of the Perth Museum.  The adjustment for 2023/24 is reflected in
Appendix 1. 
11.8 In addition, in setting the 2023/24 Revenue Budget in March 2023 the
Council Approved Expenditure to fund several specific initiatives.  For a
variety of reasons including consultation and capacity issues, there has been
slippage in the delivery of a few of these projects that may result in the
expenditure not being incurred in the current financial year.  Projects totalling
£524,000 are set out at Appendix 7. 
11.9 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 7 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery.
The final outturn for individual projects may change before the end of the
financial year. Therefore, by agreeing the projects within Appendix 7, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves. 
11.10 Should any of the projects no longer be a priority, the projected under spend
would be available to support the financial management of the Council in both
current and future financial years. 
11.11 ACTION: The Committee is asked to confirm that the projects listed in
Appendix 7 remain a priority and that the final under spends, currently
projected at £524,000 are transferred to an earmarked Reserve to ensure
delivery.  These adjustments are reflected in Appendix 1 (column 5) to the
report. 
11.12 Furthermore, under the Framework for Managing Workforce Change, the
authority to approve voluntary severance requests sits with the Executive
Leadership Team, except for requests from Chief Officers.  With that in mind,
approval is sought to draw down £217,000 from the Transformation and
Workforce Management earmarked Reserve to fund voluntary severance
requests.  These voluntary severance requests will support the delivery of
savings previously approved by Council and payback in less than two years.   
Page 22 of 104

Page 23

11.13 ACTION: The Committee is asked to approve the transfer of £217,000 from
the Transformation & Earmarked Reserve with adjustments reflected in
Appendix 1 (Column 5) to the report. 
11.14 Subject to approval of the proposals included within this report set out above,
the level of unearmarked Reserves will increase to £17.858 million or 4%. 
Insurance Fund 
11.15 In setting the 2025/26 Provisional Revenue Budget, Council has already
acknowledged the pressure on the Insurance Fund with a recurring
contribution of £800,000 from that year. 
11.16 However, based on the latest information, the level of unearmarked Reserves
is now projected to be more favourable than previously advised.  With this in
mind, and subject to this position crystallising in the 2023/24 Annual
Accounts, approval is sought for a non-recurring contribution of £1 million to
the Insurance Fund to improve the financial position of the Fund. 
11.17 ACTION: The Committee is asked to approve a contribution of £1 million to
the Insurance Fund in 2023/24 with this adjustment being reflected in
Appendix 1 (Column 5) to the report. 
11.18 Subject to approval of all the proposals included within this report and
recognising the known commitments, the level of earmarked Reserves will
reduce to £24.133 million and the level of unearmarked Reserves will be
£16.858 million or 3.7%. 
11.19 The level of unearmarked Reserves at 31 March 2024 may increase on
completion of the unaudited 2023/24 Annual Accounts are completed.  If this
does come to pass, it is proposed that the amount in excess of 4% is
transferred to the earmarked Reserve for Transformation & Workforce
Management.  The Finance & Resources Committee on 18 September 2024
will receive an update on his proposal. 
12. FINANCIAL RISKS 
12.1 In preparing the Council's 2023/24 Revenue Monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
12.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
12.3 Financial risks previously identified are summarised in Appendix 8. 
Page 23 of 104

Page 24

13. ADJUSTMENTS TO 2024/25 REVENUE BUDGET 
2024/25 Additional Funding 
13.1 Since the 2024/25 Revenue Budget was approved on 28 February 2024
(Report No. 24/63 refers), the Council has been advised of additional funding
in 2024/25 from the Scottish Government as follows.  To ensure that the
2024/25 Management Budgets continue to reflect the operational
requirements of the Council, several adjustments are required, which are
summarised below and included in Appendix 9. 
Revenue Support Grant 
• Living Wage: £7.014 million (Health & Social Care - £6.764 million,
Housing & Communities - £250,000)
• Discretionary Housing Payment: £958,000 (Customer & Digital)
• Scottish Disability Allowance - £117,000 (Finance & Business Support) 
• Whole Family Wellbeing Fund - £5,000 (Children, Families & Justice) 
Non-Domestic Rates 
• Increase in allocation - £203,000. 
13.2 The Scottish Government has advised that the adjustment in funding
identified at paragraph 13.1 will be made through a redetermination of the
Council’s Revenue Support Grant.  It is therefore necessary to adjust the
budgets for Housing & Communities, Customer & Digital, Finance & Business
Support, Health & Social Care, Revenue Support Grant and Non-Domestic
Rates. 
13.3 ACTION: The Committee is asked to approve the adjustments set out in
paragraphs 13.1 and 13.2.  These adjustments are reflected in Appendix 9
(Column 3) to this report. 
13.4 The Scottish Government has also withheld distribution of £145.5 million
nationally for teachers, which the Council has not adjusted for and amounts to
£3.625 million.  The Council’s 2024/25 Revenue Budget has been
constructed on the basis that this funding is forthcoming during the financial
year.  This funding will no longer be paid through the Revenue Support Grant
mechanism and as such the an other grant income budget has been created
in Economy, Place and Learning. 
2024/25 Service Virements 
13.5 To ensure that the 2024/25 Management Revenue Budget continues to reflect
current Service needs and operational requirements the following virements
between budgets are required. 
• Capital Grant to Communities (£139,000) to reflect a rephasing of
expenditure on Tactran capital projects – this is brought forward from
2023/24.
Page 24 of 104

Page 25

2024/25 Movements in Reserves 
Transformation Projects 
13.6 Due to the rephasing of expenditure, approval is sought to draw down funding
to take forward the following approved projects in 2024/25: 
• Anti-Poverty - £74,000 to Strategic Planning, People & Performance
• Transformation - £702,000 to Strategic Planning, People &
Performance
• Procurement & Commissioning - £142,000 to Legal & Governance
• Finance - £214,000 to Finance & Business Support 
13.7 ACTION: The Committee is asked to approve the transfers from the
Transformation and Workforce Management earmarked Reserve listed in 13.6
above. These adjustments are reflected in Appendix 9 (Column 5) to this
report. 
Council Approved Expenditure 
13.8 Approval is sought to apply funding to the Council approved projects identified
at paragraph 11.9 and Appendix 7 to 2024/25 to ensure that they are
delivered. 
13.9 ACTION: The Committee is asked to approve the adjustments set out at
paragraph 11.9 above and Appendix 7 in 2024/25.  These adjustments are
reflected in Appendix 9 (Column 5) to this report. 
Climate Change 
13.10 Approval is sought to apply the 2023/24 projected under spend of £110,000
on Climate Change identified in paragraph 10.22 to 2024/25. 
13.11 ACTION: The Committee is asked to approve the transfer of £110,000 from
the Climate Change earmarked Reserve to Environment & Infrastructure. 
This adjustment is reflected in Appendix 9 (Column 5) to the report. 
Modern Apprentices 
13.12 Approval is sought to apply £340,000 to support the modern apprentice
programme. 
ACTION: The Committee is asked to approve the transfer of £340,000 from
the Modern Apprentices earmarked Reserve to Strategic Planning, People
and Resources.  This adjustment is reflected in Appendix 9 (Column 5) to the
report. 
Working Smarter 
3.13 Approval is sought to apply £115,000 on the working smarter project
previously reported as requiring to be carried forward.
Page 25 of 104

Page 26

ACTION: The Committee is asked to approve the transfer of £115,000 from
the working smarter earmarked Reserve to Property Services. This
adjustment is reflected in Appendix 9 (Column 5) to the report. 
14. CONCLUSION 
14.1 Based on the October January 2024 ledger, a projected under spend of
£1.428 million has been identified in the current financial year. 
14.2 This level of projected over spend and contributions from unearmarked
Reserves included within this and previous reports will result in a reduction in
the level of unearmarked Reserves to £16.858 million or 3.7%. 
14.3 The financial position of the Council and its partners and ALEOs remains
challenging and regular updates will be provided to the Council and the
Finance & Resources Committee as the position develops. 
APPROVED 
Name  Designation Date
Clare Mailer  Director – Strategy, People &
Resources
28 March 2024 
Page 26 of 104

Page 27

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.  
Page 27 of 104

Page 28

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Executive Leadership Team have been consulted in the preparation of
this report.  
Page 28 of 104

Page 29

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix 1 – 2023/24 Management Budget
Appendix 2 – General Fund 2023/24 Projected Outturn – Service Analysis
Appendix 3 – Health & Social Care Partnership
Appendix 4 – Housing Revenue Account 2023/24 Projected Outturn
Appendix 5 – Other Fundings
Appendix 6 – General Fund Balances
Appendix 7 – Council Approved Expenditure
Appendix 8 – Financial Risks
Appendix 9 – 2024/25 Management Budget 
Page 29 of 104

Page 30

Page 30 of 104

Page 31

(1) (2) (3) (4) (5) (6) (7) (8) (9)
2023/24 Previously Movements Virements Movements 2023/24 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 1
Service Budgets
Education & Children's Services 230,985 10,173 25 (644) 240,539 237,778 (2,761) (1.1%)
Communities 70,439 11,268 88 (144) (328) 81,323 81,696 373 0.5%
Corporate & Democratic Services 39,596 1,669 5 (292) 40,978 40,750 (228) (0.6%)
Chief Executive Service 3,712 931 167 4,810 4,883 73 1.5%
Sub - Total: Service Budgets 344,732 24,041 113 (139) (1,097) 367,650 365,107 (2,543) (0.7%)
SECTION 2
Corporate Budgets
Health & Social Care 83,958 4,011 6 87,975 87,645 (330) (0%)
Contribution to Valuation Joint Board 1,309 1,309 1,309 0 0.0%
Capital Financing Costs 15,137 (294) (545) 14,298 14,298 0 0.0%
Interest on Revenue Balances (5,054) (761) 534 (5,281) (5,281) 0 0.0%
Net Contribution to/(from) Capital Fund 3,099 1,055 11 4,165 4,165 0 0.0%
Contribution to/(from) Insurance Fund 200 1,000 1,200 1,200 0 0.0%
Trading Operations Surplus (550) (550) 0 550 100.0%
Support Service External Income (2,153) (2,153) (2,153) 0 0.0%
Tayside Pension Fund 1,725 (70) 1,655 1,655 0 0.0%
Apprenticeship Levy 818 138 956 956 0 0.0%
Council Tax Reduction Scheme 6,200 6,200 7,350 1,150 18.5%
Discretionary Relief 1,104 1,104 1,104 0 0.0%
Net Expenditure (General Fund) 450,525 28,120 119 (139) (97) 478,528 477,355 (1,173) -0.2%
SECTION 3
Funding
Revenue Support Grant (239,627) (13,830) (1,530) (254,987) (254,987) 0 0.0%
Ring Fenced Grant (17,725) 0 (17,725) (17,725) 0 0.0%
Non Domestic Rate Income (60,754) (60,754) (60,754) 0 0.0%
Council Tax Income (103,914) (103,914) (104,114) (200) (0%)
Capital Grant (1,600) (30) 139 (1,491) (1,491) 0 0.0%
Total Financing (423,620) (13,860) (1,530) 139 0 (438,871) (439,071) (200) (0%)
Financed from/(returned to) Reserves 26,905 14,260 (1,411) 0 (97) 39,657 38,284 (1,373)
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2023/24 REVENUE
BUDGET - SUMMARY
APPENDIX
1
5
Page 31 of 104

Page 32

Page 32 of 104

Page 33

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2024)
Variance Variance
£'000 £'000
Education & Children's Services
Total (2,761)
0 DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
There are 66 primary schools, 7 secondary schools, 4 all through schools, 46 nurseries and early learning
centres and 1 special school within the Council's DSM scheme.  Each school has an individual budget, primarily
based on pupil numbers.  Headteachers are responsible for the annual budgets devolved to them in April each
year. The total DSM budget for 2023/24 is £132.051 million including carry forwards. 
Within the scheme there is a facility allowing for DSM balances, whether surplus or deficit, to be brought
forward from the previous financial year. In addition to the resources devolved, balances may also be available
to headteachers of schools that have a carry forward. In 2022/23, £722,000 of DSM balances were brought
forward.
(472) Projected under spend on staff costs due to delays in filling vacancies and release of remaining supply budgets.
162 Projected over spend on supplies and services.
(39) Projected recovery of income from Scottish Qualifications Authority
349 There is currently a projected net under spend of £349,000 based on current spending plans across all schools
for the current academic year that runs to June 2024.  The maximum carry forward under the DSM scheme is
2.5%,  the current projection is 0.3%.  The delivery of budgeted slippage targets remains challenging within
individual schools.
Pupil Equity Fund
100 The majority of schools within Perth & Kinross Council have been allocated a share of £1.874 million of Pupil
Equity Funding from the Scottish Government as a ring fenced grant.  Schools are being instructed to use this
year’s PEF Grant by 31 March 2024 as per the revised Scottish Government guidance. At this time £100,000 is
projected to be carried forward into 2024/25 for teacher and support staff costs to the end of the current
academic year.
(100) Projected carry forward of Pupil Equity Funding.
NON DEVOLVED
Education Services
Nursery Sector
(980) Additional slippage due to turnover of staff, appointments at the lower end of pay scales and impact of strikes
that took place earlier this financial year.
(34) Projected under spend on non domestic rates.
101 Projected under recovery of income due to reduced attendances at Kids Clubs
Primary Sector
854 Slippage target currently not being met within primary sector due to requirement to maintain teacher numbers
partially offset by the impact of strikes that took place earlier this financial year.
(75)
(50) Projected under spend on home to school transport.
Secondary Sector
2 Staff slippage target not being met.
(20) Projected under spend on period poverty activity.
(37) Projected under spend due to non-domestic rates revaluations.
(27) Projected under spend on home to school transport.
4 Increased loan charges due to interest rate rises.
82 Projected shortfall in income from Renewable Heat Incentive rebate.
Special Sector
(817) Additional slippage due to turnover of staff, appointments at the lower end of pay scales and impact of strikes
that took place earlier this financial year.
(20) Projected under spend on supplies and services.
34 Projected over spend on home to school transport.
14 Increased loan charges due to interest rate rises.
(39) Projected under spend on residential placements.
SERVICE Summary of Service Variances
5
Page 33 of 104

Page 34

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2024)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Services for Children, Young People & Families
(425) Projected under spend taking account of non-recurring funding of £800,000 provided for 2023/24  and staff
slippage due to delays in filling posts and proactive workforce management as part of the transformation
(44) Projected net under spend due to Acorn funding and criminal justice, partially offset by projected over spends
on legal fees and translation / interpreter services.
(41) Projected under spend on property costs.
50 Projected over spend on client travel.
191 The budget for young people with complex behavioural issues, which includes a number of pupils placed within
residential schools, is projected to over spend based on the latest placements.  This includes the provision of
£1.152 million of non-recurring funding.
82 Projected over spends on Foster Care (£43,000) and Adoption (£82,000) partially offset by projected under
spends on Kinship Care (£43,000).
25 There is a projected over spend in relation to supporting care experienced young people (continuing care,
supported accommodation) due to a doubling of the number of DWP clients. 
84 There is a projected over spend on self directed support (children & disability team - respite provision) due to
the level of demand and an increase to the hourly rate paid to clients.
(259) Additional grant funding from Unaccompanied Asylum Seeking Children (£241,000) and Wellbank (£18,000)
which offset some of the costs above.
Business and Resources Services
(160) Additional slippage due to turnover of staff.
(45) Projected net under spend across several budget headings including transport, school uniform grants and
breast buddies, partially offset by over spends on SEEMIS Licence costs, courier recharges, electrical testing &
advertising.
Catering Services
(370) Projected under spend within the Early Learning & Childcare 1140 grant for nursery meals based on latest
uptake.
(841) Projected under spend on the provision of school meals due to increased uptake and updated projections from
Tayside Contracts.
Page 34 of 104

Page 35

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2024)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Communities
Total 373
ENVIRONMENTAL AND CONSUMER SERVICES
Roads
(125) Projected additional income from statutory road network works
165 Projected over spend on flood maintenance contracts
(75) Projected under spend on Street Lighting maintenance
2,213 Projected additional costs relating to severe weather events in October 2023.
(1,415) Income recoverable from the Scottish Government under the terms of the Bellwin Scheme
150 Additional costs in relation to maintenance around the River Ericht
(150) Contribution from Scottish Government to River Ericht works
(125) Projected saving on street lighting contract
50 Projected over spend on winter maintenance response.
90 Almondbank Flood Prevention Scheme Revenue Contribution
Regulation
25 Projected shortfall in Corporate Health and Safety income
Operations
200 Projected net shortfall in commercial waste income
(250) Projected additional income from sale of recyclates due to favourable market prices and introduction of twin-
streaming collection
100 Additional hire costs for refuse collection vehicles
(100) Projected saving on waste disposal contract following introduction of twin-streaming collection
125 Projected over spend on supplies and services
Fleet Management
(115) Saving on loan charges due to slippage on planned vehicle replacement programme
250 Additional cost of vehicle materials and repairs
Waste Strategy
40 Additional consultancy costs to support the review of operational assets.
130 Projected expenditure on education and awareness for introduction of twin-streaming collection service
Bereavement Services
(40) Additional income from Bereavement Services
CULTURE AND COMMUNITIES
150 Savings delayed on Single Cultural Trust.
(35) Projected under spend on period dignity activity.
PLANNING AND DEVELOPMENT
90 Perth Harbour - projected increase in operating costs /shortfall in income.  Some of these costs will continue
beyond the current financial year.
(100) Projected additional Planning & Building Warrant Income based on income trend to date
100 Projected over spend / under recovery of income within Events budgets
60 Projected over spend within Estates Commercial Property account.
(50) Projected under spend of energy costs, net of maintenance costs for electric vehicle charging points.
65 Projected over spend on legal costs associated with planning appeals.
(20) Projected under spend across Business & Place
25 Projected over spend within Smart Investment
HOUSING
50 Projected increase in energy costs at Greyfriars Hostel
30 Void rent loss for housing support properties
10 Increased energy costs and rates within dispersed PKC accommodation
(20) Temporary accommodation - reduction in estimated bad debt provision
(20) PKC Lets Management Fee Income
BUSINESS AND RESOURCES
Service Wide
(1,200) Slippage in excess of budgeted target.
30 Projected over spend on IT licensing and support costs.
35 Overspend within non-staff budgets across the service
Page 35 of 104

Page 36

APPENDIX 2
PERTH & KINROSS COUNCIL - GENERAL FUND 2023/24 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2024)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Public Transport Unit / Car Parking Account
25 Perth Bus Station - increased costs
60 Projected net over spend on Tendered Services
(130) Projected additional income from park and ride departure charges.
35 Additional IT licensing costs
40 Delay in achieving Corporate Asset Management Savings
Corporate & Democratic Services
Total (228)
Legal & Governance Services
(84) Projected under spend on staff costs.
13 Updated projections in relation to income and supplies and services.
Finance
118 Over spend on external audit fee following increase in charges and licensing costs.
Human Resources
(177) Projected net under spend on staff costs, supplies & services and income.
Information Technology and Revenues & Benefits
(74) Projected under spend on staff costs
179 Projected  net over spend on supplies and services, including postages, interpreter services and licensing costs
and third party / transfer payments.
155 Projected net over spend on crisis grants and community care grants
Property
425 Projected overspend on property maintenance across the Council estate
(461) Projected under spend on energy based on consumption to date.
(229) Projected under spend on Pullar House due to updated inflation assumptions
(93) Projected net under spend across the all other Property function budgets.
Chief Executive Service
Total 73 Core Costs
73 Projected over spends across the Service, including one off costs of change as the Council moves to the new
leadership structure.
TOTAL (2,543)
Page 36 of 104

Page 37

APPENDIX 3
Perth & Kinross Integration Joint Board (IJB)
Projected outturn based on Revenue Monitoring to 31 December 2023
Social Care Health
Health & Social
Care
Partnership
£'000 £'000 £'000
DEVOLVED FUNCTIONS
Older People Services 2,585 (44) 2,541
Adult Services (642) (448) (1,090)
Other Community Services (271) 0 (271)
Management/Commissioned/Other (120) (295) (415)
Undelivered Savings 708 740 1,448
Sub Total - Hospital & Community Health 2,260 (47) 2,213
P&K IJB Lead Partner 0 (951) (951)
Dundee & Angus Hosted Services Recharges In/Out 0 1,097 1,097
Sub Total - Lead Partner Arrangement 0 146 146
GP Prescribing / Other Family Health Services 0 3,040 3,040
General Medical Services / Family Health Services 0 44 44
Sub Total - PKHSCP 2,260 3,183 5,443
Approved Use of General Reserves in 2023/24 (1,813) (2,970) (4,783)
Total Projected Outturn PKHSCP 447 213 660
NON - DEVOLVED FUNCTIONS (330) (330)
Projected Out-turn Over / (Under) Spend
5
Page 37 of 104

Page 38

Page 38 of 104

Page 39

APPENDIX 4
PERTH & KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2023/24 PROJECTED OUTTURN
(Based on expenditure to 31 January 2024)
£'000
(163) Housing Repairs
Projected under spend on staff costs (£161,000), service & maintenance contracts (£110,000), planned maintenance (£70,000) and
supplies & services (£9,000).  This is partially offset by projected savings on energy costs (£63,000), EICRs (£44,000), external voids
(£30,000), transport hire (£29,000) and internet of things (£21,000).
(30) Improvements
Additional Renewable Heat Incentive income (£61,000) and projected under spends on staff costs (£39,000) and other costs (£8,000),
partially offset by additional costs in relation to retrofit strategy (£78,000) partially offset by projected under spend on staff costs
(£10,000).
279 Letham, North & South
Projected over spends on IT costs (£90,000); staff costs (£76,000), decant costs in relation to burst pipes (£44,000); garden
maintenance (£31,000); costs of uplifts, cleans & grass cuts (£64,000); cleaning (£5,000) and other non-staff related budgets (£5,000). 
These are partially offset by a projected under spend on sheriff officer fees (and related income) (£20,000), transport costs (£13,000)
and additional income (£3,000).
0 Perth City and Specialist
Projected over spends on decant costs / disturbance payments relating to burst pipes (£69,000), non-staff budgets (£17,000) and
energy (£7,000), partially offset by projected under spends on additional income from the Common Housing Register (£11,000) and
recharges (£19,000) and additional staff slippage (£63,000). 
58 Housing Management
Projected over spend on staff costs (£26,000) and costs for the valuation of Council stock (£32,000).
(520) Administration
Projected under spend on bad debt provision based on latest assessment of arrears (£683,000), an increased net income from
recharges to and from the Housing Revenue Account (£39,000) and under spends on property costs (£24,000).  These are partially
offset by additional void rent loss (£180,000) and increased sales ledger bad debt provision (£46,000).
96 Income
Projected shortfall in mainstream rental income due to less properties than anticipated when budget was set (£334,000) and reduced
income for commercial rent (£30,000).  These are partly offset by projected increased income for Interest on Revenue Balances
(£250,000) and additional income for garages and lock-ups (£18,000).
280 Capital Financed from Current Revenue
As a result of the projected net under spends highlighted above, this is the increase in the amount available to invest in the HRA
capital programme from the Revenue Budget.
0
Summary of Service Variances
5
Page 39 of 104

Page 40

Page 40 of 104

Page 41

APPENDIX 5
Other Grant Funding
Education & Children’s Services
Creative Scotland – Youth Music Initiative £245,208
Scottish Government – CJS Caledonian Funding £155,040
Communities
UK Government – Homes for Ukraine Q2 £279,800
UK Government – Homes for Ukraine Q3 £252,800
Scottish Government – Ukraine Long Term Settlement Fund £84,213
TOTAL £1,017,061
5
Page 41 of 104

Page 42

Page 42 of 104

Page 43

Appendix 6
General Fund Reserves Update
Proposals
Included in
Report
Proposals
Included in
Report
Commit-
ments
31/3/23 23/24 24/25 25/26 23/24 24/25 Balance
£m £m £m £m £m £m £m £m
General Fund Balance 70.046
Balances Held Under Statute / Regulation
- Revenue Grants (15.947) 9.755 (6.192)
- Council Tax Income for affordable housing (4.353) 0.112 0.157 (0.283) (4.367)
- Developers Contributions: Affordable Housing (4.298) (4.298)
- Car Parking (1.512) 0.120 0.250 (1.142)
- Developers Contributions: Commuted Sums (1.242) (1.242)
- Devolved School Management (0.722) 0.722 0.000
Sub total (28.074) 10.589 0.277 (0.283) 0.000 0.000 0.250 (17.241)
Balances Held for Specific (Previously Approved) Purposes
- Services for Children, Young People & Families (2.139) 1.858 0.281 0.000
- Contribution to 2023/24 Revenue Budget (1.699) 1.699 0.000
- School Estate (2.063) 0.724 1.589 (0.805) (0.555)
- Learning Estate Decants (0.700) 0.700 0.000
- Culture (1.172) 0.091 0.370 0.236 0.204 (0.271)
- Financial Insecurity (0.680) 0.680 0.000
- School Counsellors (0.556) 0.227 0.227 0.102 0.000
- Works Maintenance (0.400) 0.200 (0.200)
- Modern Apprentice Scheme (0.340) 0.000 0.340 0.000
- Project Feasibility Fund (Covid-19) (0.279) 0.211 0.040 (0.028)
- Cemetery Walls (0.271) 0.009 0.126 0.119 (0.017)
- Perth and Kinross Offer (0.252) 0.252 0.000
- PH20 (0.212) 0.150 (0.062)
- Working Smarter (Covid-19) (0.194) 0.079 0.115 0.000
- UCI Cycling World Championships (0.180) 0.180 0.000
Approved
Contributions from /
(to)
Reserves
5
Page 43 of 104

Page 44

Appendix 6
General Fund Reserves Update
Proposals
Included in
Report
Proposals
Included in
Report
Commit-
ments
31/3/23 23/24 24/25 25/26 23/24 24/25 Balance
£m £m £m £m £m £m £m £m
Approved
Contributions from /
(to)
Reserves
- Community Resilience 0.000 (0.175) (0.175)
- Climate Change (0.153) 0.153 (0.110) 0.110 0.000
- Ventilation Measures (0.114) 0.090 (0.024)
- Salix (0.113) 0.025 0.088 0.000
- Local Area Partnerships (0.090) 0.030 (0.060)
- Community Investment Fund (0.089) 0.051 (0.038)
- Grounds Maintenance ( A9/A85) (0.060) 0.060 0.000
- Local Government Elections 0.000 (0.053) (0.053) (0.053) 0.159 0.000
- Financial Assistance (Mod) 0.000 (0.020) (0.020) (0.020) (0.060)
- Council Approved Expenditure 0.000 (0.653) 0.653 (0.474) 0.474 0.000
Sub total (11.756) 6.568 3.173 0.148 (1.153) 1.039 0.491 (1.490)
Balances Held for Other Purposes 0.000
- Transformation & Workforce Management (9.530) 2.528 0.356 0.060 0.056 1.182 1.000 (4.348)
- Anti - Poverty (2.193) 0.529 0.575 0.035 (1.054)
Sub total (11.723) 3.057 0.931 0.095 0.056 1.182 1.000 (5.402)
Earmarked Reserves (51.553) 20.214 4.381 (0.040) (1.097) 2.221 1.741 (24.133)
Uncommitted General Fund Balance 18.493
Impact of Current Year Projected Outturn 1.373
Commitments from unearmarked Reserves (3.008)
Updated Uncommitted General Fund Balance 16.858
Percentage of Net Revenue Budget 3.7%
Page 44 of 104

Page 45

APPENDIX 7
Council Approved Projects - 1 March 2023
Education & Children’s Services
Food and Fun activities - School Holidays £20,000
Communities
Rural Events £30,000
Green Capital Recovery Fund £424,000
Chief Executive's Service
Child Poverty Small Grants £50,000
Total £524,000
5
Page 45 of 104

Page 46

Page 46 of 104

Page 47

Appendix 8
FINANCIAL RISKS
Risk to Revenue Budget Mitigation
1 Achievement of staff slippage targets, particularly
relating to teacher numbers and impact on pupil /
teacher ratio
- Proactive workforce
management
- Revenue monitoring
- Future budget submissions
2 Increasing demand / need / complexity for services
for children, young people and families and
reducing budgets.
- Proactive management
- Revenue monitoring
- Future budget submissions
3 Ceasing of additional Financial Insecurity Funding
on 31 March 2024.
- Proactive management
- Revenue monitoring
- Future budget submissions
4 Current year non-teaching pay awards - Revenue monitoring
- Future budget submissions
5 Support for Tayside Contracts - Tayside Contracts
Governance & Strategy Group
- Revenue monitoring
- Future budget submissions
6 Inflation - Revenue monitoring
- Future budget submissions
5
Page 47 of 104

Page 48

Page 48 of 104

Page 49

(1) (2) (3) (4) (5) (6)
2024/25 Previously Movements Virements Movements 2024/25
Council Approved in in Revised
Approved Adjustments Funding Reserves Mgt
Budget (Net) Budget
£'000 £'000 £'000 £'000 £'000 £'000
SECTION 1
Service Budgets
Economy, Place & Learning 262,153 (3,370) 139 584 259,506
Strategy, People & Resources 91,813 1,075 1,637 94,525
Sub - Total: Service Budgets 353,966 0 (2295) 139 2,221 354,031
SECTION 2
Corporate Budgets
Health & Social Care 87,498 6,764 94,262
Contribution to Valuation Joint Board 1,328 1,328
Capital Financing Costs 16,628 16,628
Interest on Revenue Balances (5,411) (5,411)
Net Contribution to/(from) Capital Fund 6,710 6,710
Contribution to/(from) Insurance Fund 200 200
Trading Operations Surplus (550) (550)
Support Service External Income (2,238) (2,238)
Tayside Pension Fund 1,655 1,655
Apprenticeship Levy 956 956
Leadership and procurement targets (1,505) (1,505)
Council Tax Reduction Scheme 7,400 7,400
Discretionary Relief 1,104 1,104
Net Expenditure (General Fund) 467,741 0 4,469 139 2,221 474,570
SECTION 3
Funding
Revenue Support Grant (275,847) (4,266) (280,113)
Ring Fenced Grant (3,806) (3,806)
Non Domestic Rate Income (65,152) (203) (65,355)
Council Tax Income (107,517) (107,517)
Capital Grant (1,600) (139) (1,739)
Total Financing (453,922) 0 (4,469) (139) 0 (458,530)
Financed from/(returned to) Reserves 13,819 0 0 0 2,221 16,040
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2024/25 REVENUE
BUDGET - SUMMARY
APPENDIX
9
5
Page 49 of 104

Page 50

Page 50 of 104

Page 51

PERTH & KINROSS COUNCIL 
Finance & Resources Committee 
24 April 2024 
COMPOSITE CAPITAL BUDGET 2023/28 & HOUSING INVESTMENT
PROGRAMME 2023/28 – MONITORING REPORT No.4 
Report by Strategic Lead – Finance & Business Support
(Report No. 24/131) 
1. PURPOSE 
1.1 This report provides a summary position to date for the 5-year Composite
Capital Budget and the 5-year Housing Investment Programme for 2023/24 to
2027/28 and seeks approval for adjustments to the programmes. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
(i) notes the contents of the report.
(ii) approves the proposed adjustments to the five-year Composite Capital
Budget 2023/24 to 2027/28 set out in Sections 5 and 6 of the report
and summarised in Appendices I and II.
(iii) approves the proposed adjustments to the Housing Investment
Programme Budget 2023/24 to 2027/28 set out in Section 7 of the
report and summarised in Appendix III.
(iv) notes progress with the delivery of major Capital projects as
summarised in Appendix IV. 
3. STRUCTURE 
3.1 The report is structured over the following sections: 
• Section 4: Background / Main Issues
• Section 5: Composite Capital Programme – Gross Capital Resources
• Section 6: Composite Capital Programme – Expenditure
• Section 7: Housing Investment Programme
• Section 8: Summary 
4. BACKGROUND / MAIN ISSUES 
4.1 The Finance & Resources Committee approved an updated five-year gross
Composite Capital Budget for 2023/24 to 2027/28 totalling £623.916 million
and a five-year gross Housing Investment Programme for 2023/24 to 2027/28
totalling £92.205 million at its meeting on 31 January 2024 (Report 24/41
refers). 
6
Page 51 of 104

Page 52

4.2 At its meeting on 28 February 2024, the Council approved a revised
Composite Capital Budget for the 6 years 2024/25 to 2029/30 (Report 24/64
refers). In line with the previous reports for 2023/24, this report only refers to
years 2023/24 to 2027/28 with the total gross budget approved for the 5
years, including 2023/24, totalling £673.453 million. This includes the
adjustments approved by the Council for these years on 28 February 2024,
whilst the budgets for 2028/29 and 2029/30 will be included in the monitoring
reports for 2024/25. 
4.2 This report advises on expenditure to 29 February 2024, and the latest
estimate of the projected outturn for each of the years to 2027/28 for the
Composite Programme and for the Housing Investment Programme. 
5. COMPOSITE CAPITAL PROGRAMME – GROSS CAPITAL RESOURCES 
5.1 On 28 February 2024 the Council approved a revised Composite Capital
Budget totalling £673.453 million for the years 2023/24 to 2027/28, which
reflected an increase in resources of £49.537 million from the Budget
approved on 31 January 2024. All approved movements in resources and
expenditure have been included in Appendices I and II of this report and are
summarised in the table below: 
Increase in Gross Expenditure: £m
Bertha Park Link Road 13.200
Comrie Flood Scheme 11.577
South Kinross Flood Scheme 11.314
Milnathort Flood Scheme (1.306)
Flood Mitigation – Dunkeld and Craigie Burn 1.000
IT Licensing & Infrastructure 6.330
Friarton Depot Waste Transfer Station 3.000
Economic Development 2.000
Other (Mosaic, Traffic Signals, CWSR, Community Planning) 2.422  
Total Increase in Gross Expenditure 49.537  
Funded By: 
Increase in General Capital Grant (Flood Schemes, CWSR,
General Allocation)
(16.553)
Capital Receipt (0.400)  
Increase in Borrowing 32.584 
5.2 As a result of ongoing monitoring of the programme, further adjustments to
the budget are proposed. The current estimated total gross capital resources
(which includes movements in Capital Receipts, Capital Grants, Contributions
and borrowing) available over the five years 2023/24 to 2027/28 amount to
£678.939 million. 
Page 52 of 104

Page 53

5.3 Movements from the revised Composite Capital Budget approved on 28
February 2024 for the five years are summarised in the table below, and the
constituent elements for each year are shown in Appendix I. 
Total Gross Composite Capital Resources 
Approved 
28 February 2024
Current
Estimate
Movement 
£m £m £m
2023/24 184.831 158.138 (26.693)
2024/25 207.568 201.068 (6.500)
2025/26 119.305 90.913 (28.392)
2026/27 90.371 106.406 16.035
2027/28 71.378 122.414 51.036
Total 673.453 678.939 5.486  
5.4 The overall movement in total Gross Resources for the 5 years 2023/24 to
2027/28 since 28 February 2024 shown at Section 5.2 above can be
summarised as follows: 
£’m
Increase in Ring-Fenced Receipts (Section 5.5) 0.078
Decrease in Revenue Contributions (Section 5.6) (0.023)
Increase in Third Party Contributions (Section 5.7)  0.231
Increase in Borrowing Requirement (Section 5.8 and 5.9) 5.200
Increase in Gross Capital Resources (Section 5.3) 5.486 
5.5 There has been some rephasing of General Fund and Commercial Property
receipts across the 5-year programme but with no change to the overall totals
under each category. However, there is an increase in Ring-Fenced receipts
of £78,000 in the current year (disposal of vehicles). 
5.6 Revenue Contributions have reduced by a total of £23,000 over 2023/24 and
2024/25, relating to Mosaic (reduction of £74,000, Section 6.4.5 refers), Traffic
and Road Safety (increase of £40,000, Section 6.3.2 refers) and Community
Greenspace (increase of £11,000. Section 6.3.10 refers). 
5.7 Third Party Contributions have increased by £218,000 in 2023/24 and
£13,000 in 2024/25, relating to Structural Maintenance (£176,000, Section
6.3.3 refers), Community Greenspace (£51,000, Section 6.3.10 refers) and
Other Planning Projects (£4,000). 
5.8 The projected borrowing requirement in 2023/24, which is effectively the
balancing item for resources, is £109.837 million. This is £25.533 million
lower than the borrowing requirement approved by Council on 28 February
2024. 
5.9 The total borrowing requirement in the subsequent years 2024/25 to 2027/28
has increased by £30.733 million to £425.984 million, resulting in an overall
increase of £5.2 million in the total level of borrowing across the whole 5-year
programme. The movement in borrowing is summarised as follows: 
Page 53 of 104

Page 54

Page 54 of 104

Page 55

2023/24 2024/25 2025/26 Later
Years
Total 
£m £m £m £m £m
Increase in Prudential Borrowing –
Communities (net of receipts)
(Section 6.3.12)
(0.168) 5.228 0.050 0.090 5.200
Movements arising from re-
phasing of expenditure and
receipts (Appendix II)
(25.365) (13.212) (28.404) 66.981 0.000
Increase/(Decrease) in
Borrowing Requirement
(25.533) (7.984) (28.354) 67.071 5.200 
5.10 The chart below shows the Capital Resources required to fund the 2023/24
Composite Capital Programme following the proposed budget adjustments
detailed in this report. 
6. COMPOSITE CAPITAL PROGRAMME – EXPENDITURE 
6.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme 
6.1.1 Total expenditure (net of grants and contributions) to 29 February 2024 on the
Composite Capital Programme is detailed in Appendix II and summarised as
follows: 
Projected
Outturn
(£m)
Net Expenditure
to 29 February
2024 (£m)
% of
Projected
Outturn    
Education & Children’s Services  53.443 39.656 74%
Communities 73.438 68.953 94%
Health & Social Care 1.053    0.557 53%
Corporate & Democratic Services 8.623 5.438 63%
Total Net Capital Expenditure 136.557 114.604 84%
69.5%
26.2%
0.2%
1.8%
1.3%
1.0%
4.3%
Projected Capital Resources 2023/24
(March 2024)
Borrowing (£109.837M)
Grants (£41.479M)
Tay City Deal (£0.271M)
Developer Contributions (£2.847M)
Third Party & Revenue Contributions (£2.087M)
Receipts (£1.617M)
£Million
Page 55 of 104

Page 56

6.1.2 The Service Budget projections included within this section and Appendix II
to Appendix IV have been prepared based on the Council’s previous
structure.  Going forward, future reports will reflect the new structure. A
comprehensive monitoring exercise has been carried out, which is detailed in
Appendix II. The most significant features are discussed below. 
6.1.3 In common with all Scottish local authorities and public and private sector
bodies, the Council has experienced significant inflationary pressures on the
delivery of its Capital investment programme over the past few years. 
6.1.4 The Building Cost Information Service (BCIS) publish well established cost
indices for the construction industry. The BCIS All-in Tender Price Index,
which shows the general movement on construction pricing, currently
forecasts a 2.9% increase in construction costs in the current year compared
to 8.6% for the same period last year, indicating a continuing slowdown in
construction inflation. BCIS expects annual growth in tender prices to continue
to fall, reaching 1.6% by the end of 2024, however, global issues may
significantly impact both haulage costs for raw materials and fuel costs and
the situation will be kept under review. 
6.2 Education & Children’s Services 
6.2.1 The Executive Director (Education & Children’s Services) reviewed the
programme for their Service and proposed the following budget adjustments
which reflect the rephasing of existing budgets: 
Project 2023/24
£m
2024/25
£m
Later
Years
£m
Description
Investment in
Learning Estate
0.243 (0.243) 0.000 Acceleration of budget to align with
works completed in 2023/24. 
Methven Primary
School
Refurbishment
0.119 (0.119) 0.000 Acceleration to cover fees that
were incurred earlier than
previously anticipated.
New Primary
School at Bertha
Park site
0.159 0.000 (0.159) Programme previously revised in
line with current/anticipated
housebuilding in the catchment
area. Rephasing of some funding
to cover the fees incurred in
2023/24. 
Perth Academy
Refurbishment
0.755 (0.755) 0.000 Rephasing of budget to align with
latest estimated cashflow and year
end projection from the contractor.
Perth Grammar
School
0.263 (0.263) 0.000 Planned works were previously
rephased by one year to reflect
diversion of resources towards
replacement of Reinforced
Autoclaved Aerated Concrete
(RAAC) roof during 2023.
Acceleration reflects cost of works
that were actioned during 2023/24.
Page 56 of 104

Page 57

Perth High School
– New School
(4.840) 4.840 0.000 Rephasing of budget to align with
latest estimated cashflow from the
contractor. There is no change to
the planned completion date. 
6.2.2 All of the above proposed adjustments have been reflected in Appendix II. 
6.3 Communities 
6.3.1 The Executive Director (Communities) reviewed the programme for their
Service and proposed various budget adjustments, the most significant of
which are described below. 
6.3.2 Within Traffic & Road Safety, it is proposed to transfer £66,000 from
Pedestrian Crossings in future years to Cycling, Walking and Safer Streets
(CWSS) in the current year. Consequently, it is also proposed to reallocate
£66,000 of CWSS grant to this programme. In addition, due to increased
costs on the extension of car parking within Auchterarder, an additional
Revenue Contribution from the Car Parking Reserve of £40,000 is proposed. 
6.3.3 Within the Structural Maintenance budget, it is proposed to move £922,000 to
2024/25 due to the team focussing on works as part of the Bellwin Scheme.
This movement encompasses an underspend of £746,000 in the current year,
combined with additional Third-Party Contributions of £91,000 from Scottish
Forestry, £80,000 from Scottish Gas towards reinstatement works and £5,000
for Road Adoptions. In addition, within Roads and Lighting the following
smaller adjustments are proposed:  
Project 2023/24
£m
2024/25
£m
Later
Years
£m
Description
Traffic Signal
Renewals 
(0.069) 0.069 0.000 During 2023/24 some works
to traffic signals were
funded in Revenue with an
impact on capital signal
works. These are now
scheduled for 2024/25.
Footways 0.077 (0.020) (0.057) Funding to be accelerated
from future years towards
additional works on Tay
Street. 
6.3.4 Within Asset Management – Bridges, it is proposed to draw down £42,000
from the Bridge Refurbishment Programme to Culteuchar Culvert in 2023/24,
with a further amount of £20,000 in 2024/25. In addition, the following
rephasings are proposed: 
Page 57 of 104

Page 58

Project 2023/24
£m
2024/25
£m
Later
Years
£m
Description
Bridge
Refurbishment
Programme 
(0.222)  (0.696) 0.918 Ongoing assessment of the
works to be completed during
2023/24 and 2024/25 has
concluded there will be
underspend in both years. It
is proposed this underspend
is rephased equally into
future years. 
Old Perth Bridge 
Perth Queen’s
Bridge
(0.140) 
(0.083)
0.040 
0.083
0.100 
0.000
All works that can be
completed prior to major
works in 2025/26 have
concluded. The remaining
budget is rephased in line
with planned works on Old
Perth Bridge and Queen’s
Bridge following the opening
of Destiny Bridge.   
Garry Viaduct (0.072) 0.072 0.000 There are delays on
consultancy work for Garry
Viaduct and it is proposed
£72,000 is moved by one
year to 2024/25. 
6.3.5 Within Improvement Schemes, £213,000 of the contingency budget within the
A9/A85 Road Junction Improvements budget is not required in 2023/24, and it
is therefore proposed that this is moved to 2024/25. The Cross Tay Link Road
(Destiny Bridge) project is progressing as planned and is currently on
schedule, however it is proposed that £15.057 million is rephased from
2023/24 to 2024/24 following a review of the value of works completed by the
31 March 2024. In addition, design and consultancy works have progressed in
2023/24 for the Bertha Park Link Road, with ground investigations and further
consultancy due to take place in 2024/25. Accordingly, it is proposed
£324,000 and £368,000 are accelerated from 2027/28 to cover these
respectively. 
6.3.6 Within Public Transport it is proposed the budget of £199,000 for Community
Transport Initiatives is moved to 2024/25 as a result of the 26 week lead time
to purchase vehicles. 
6.3.7 Within Flood Schemes, works at Comrie are expected to commence in August
2024 by the works contractor. The works on the scheme were previously
expected to last for 18 months but has been revised to 24 months. The flood
scheme at South Kinross is facing potential land acquisition difficulties and as
such is also likely to be delayed, whilst the flood scheme at Scone has been
paused by the Scottish Government with major works unlikely to take place
prior to 2027/28. It has therefore been necessary to revise the spend profile of
these schemes as outlined below: 
Page 58 of 104

Page 59

2023/24
£m
2024/25
£m
2025/26
£m
2026/27
£m
2027/28
£m
Comrie 0.000 0.121 (7.298) (1.623) 8.800
South Kinross 0.026 (1.496) (3.719) 1.964 3.225
Scone 0.000 0.004 (0.188) (0.348) 0.532 
In addition to the above, within Flood Protection Measures the following
rephasing’s are also proposed: 
Project 2023/24
£m
2024/25
£m
Later
Years
£m
Description
South Inch Culvert
Reinstatement 
(0.262)  0.262 0.000 Further engineering
assessment is necessary
resulting in a delay to work
in 2023/24.
Coastal Change
Adaptation
(0.100) 0.100 0.000 Flood team focussing on
severe weather in latter part
of 2023/24, this project has
therefore not progressed as
planned. 
6.3.8 Within Place-making, the Mill Street Environmental Improvements have been
completed and it is proposed that the remaining budget in 2023/24 of £78,000
is transferred to Perth City Centre Golden Route with £40,000 allocated to
2023/24 and the remaining £38,000 to 2024/25. In addition to this the
following rephasing’s are proposed: 
Project 2023/24
£m
2024/25
£m
Later
Years
£m
Description
Perth, Place,
People 
(3.598)  3.598 0.000 Discussions are ongoing
around potential schemes
and the possibility of match
funding. No scheme to
progress in 2023/24. 
Perth & Kinross
Lighting Action
Plan
(0.433) 0.433 0.000 The level of works to be
completed in 2023/24 is
lower than previously
anticipated. It is proposed
that £433,000 of the budget
is moved into 2024/25. 
6.3.9 In line with the Council decision on 28 February 2024, the budget for PH2O is
to be reviewed as part of the Review of Leisure Assets. In the meantime, it is
proposed that the existing budgets of the project in 2024/25 to 2027/28 be
rephased over this period, as reflected in Appendix II. This will be reviewed
further in light of the findings of the Review of Leisure Assets. 
6.3.10 Within Community Greenspace, a Revenue Contribution of £11,000 and
Third-Party Contribution of £13,000 have been provided towards Community
Page 59 of 104

Page 60

Greenspace Bridges in 2023/24 and 2024/25 respectively, with a proposed
subsequent increase in the expenditure budget. Additional Third-Party
Contributions have also been received towards Core Path Implementation
(£24,000) and Premier Parks (£14,000) with the expenditure budgets for each
programme increased accordingly. On Community Greenspace Sites it is
proposed that the budget in 2024/25 is reduced by £321,000 with a further
reduction of £232,000 in 2025/26. Of this £432,000 is rephased to future
years with the remaining £121,000 vired between other Community
Greenspace projects as follows: 
Project 2023/24
£m
2024/25
£m
Settlement / Neighbourhood Parks  0.001 0.050
Community Greenspace Bridges 0.000 0.056
Core Path Implementation 0.012 0.000
Premier Parks 0.006 0.000
Auchterarder Public Park (0.004) 0.000 
0.015 0.106 
6.3.11 Within Commercial Property Investment Programme, works on the
Ruthvenfield Business Centre have been paused while other potential uses
for the site are identified. It is therefore proposed that £1.256 million of the
budget is moved into 2024/25. 
6.3.12 Within the Prudential Borrowing Projects, on Recycling Containers, it is
proposed to borrow an additional £160,000 over the next 4 years to cover
increased costs of replacement. Additionally, on the Vehicle Replacement
Programme, Fleet are continuing the catch-up exercise of vehicle purchases
following worldwide supply issues which has also resulted in the significant
increase in cost of new vehicles over the past couple of years. Deliveries are
expected in 2024/25 for vehicles purchased in 2023/24 and it is therefore
proposed to reduce the budget in 2023/24 by £113,000 and increase the
budget in 2024/25 by £5.231 million. There are corresponding adjustments to
capital receipts for vehicle disposals resulting in a net increase in borrowing of
£5.040 million for vehicles. The total increase in Prudential Borrowing
Projects is £5.2 million. 
6.3.13 Within Housing Projects, following a vacancy on the team and with a focus on
the chalet replacement project at Double Dykes, Gypsy Traveller Site
Improvement works have not been progressed in 2023/24 and it is proposed
that a total of £409,000 is moved into 2024/25.   
6.3.14 All the above proposed adjustments, together with other small movements,
have been reflected in Appendices I & II. 
6.4 Corporate & Democratic Services 
6.4.1 The Chief Operating Officer reviewed the programme for their Service and
proposed the budget adjustments described below. 
Page 60 of 104

Page 61

Property Services 
6.4.2 Within the Property Compliance Works Programme the preliminary work on
the Friarton Depot Transfer Shed structural remedials are to take place
following the 2023/24 year-end, and as such it is proposed that £327,000 is
moved into 2024/25. Similarly, on the Capital Improvement Projects
Programme with work scheduled to take place in 2024/25, it is also proposed
that £238,000 of this budget is moved into 2024/25. 
6.4.3 The Upgrade Programme at Pitlochry High School requires further
infrastructure works which are likely to be disruptive. With the need to protect
the learning environment these works could not take place in 2023/24 and will
instead be undertaken during the summer holidays and require the moving of
£136,000 to 2024/25.   
6.4.4 Within Decarbonisation there is a delay to delivery of Phase II following delays
in the completion of contract documentation with works now due to take place
in 2024/25, with £150,000 of the budget moved accordingly. 
6.4.5 Implementation of the Mosaic Social Work system is progressing and is
anticipated to “go-live” in the summer 2024. Accordingly, an increased amount
has been spent for Consultancy and Data Migration in 2023/24 with a
corresponding reduction in 2024/25. It is therefore proposed to rephase the
budget as shown in Appendix II. 
6.4.6 All the above proposed adjustments, together with other small movements,
have been reflected in Appendix II. 
6.5 Health & Social Care 
6.5.1 Within Occupational Therapy Equipment, the service is seeing an increase in
demand from the growing elderly population combined with an increase in the
number of items of equipment individuals require, as well as inflationary cost
increases for the equipment. It is therefore proposed that £100,000 is
accelerated from 2027/28 to 2023/24. 
6.5.2 The Technology Enabled Telecare project to upgrade the community alarm
system has faced supply difficulties during the year and issues with some
equipment requiring further testing prior to installation. These issues have now
been resolved and it is expected the project will now continue as planned. It is
therefore proposed that £350,000 of the budget in 2023/24 is rephased
equally across future years. 
7. HOUSING INVESTMENT PROGRAMME 
7.1  The total current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2023/24 to 2027/28 amounts to
£96.205 million. This has increased by £4 million following the approval of
the revised Housing Investment Programme by the Housing & Social
Wellbeing Committee on 24 January 2024 (Report 24/24 refers) which
allocated further resources to the Council House Buy-Back Programme from
Page 61 of 104

Page 62

2024/25 to 2027/28. Movements from the previous estimates approved by this
Committee on 31 January 2024 are summarised in the table below and
detailed in Appendix III. 
Approved 
31 January 2024
Current
Estimate
Movement 
£m £m £m
2023/24 18.738 19.249 0.511
2024/25        18.831       21.536 2.705
2025/26 17.248 19.942 2.694
2026/27 16.283 15.633 (0.650)
2027/28 21.105  19.845  (1.260)
Total 92.205 96.205 4.000 
Total Expenditure to 29 February 2024 (Housing Investment Programme) 
7.2 Net expenditure for 2023/24 to 29 February 2024 amounts to £18.863 million
and receipts amount to £11,000. Therefore, the borrowing requirement for the
year to date is £18.852 million. 
7.3 The Executive Director (Communities) reviewed the Housing Investment
Programme and proposed the budget adjustments outlined below.
7.4 Phase 2 of the Council House New Build Programme at Lynedoch Road,
Methven has commenced with £1.243 million provided by the Scottish
Government in 2023/24 and an allocation from Council Tax Second Home
income of £240,000 in 2024/25. These amounts are complemented by
proposed transfers of £91,000 into 2023/24 and £932,000 into 2024/25 from
Future Developments budget in 2027/28.
7.5 It is proposed to transfer a further £1.237 million from the New Build Future
Developments Budget in 2027/28 to the Council House Buy-Back programme
in 2023/24. This is supplemented by additional grant of £630,000 from the
Scottish Government and reflects the additional properties being purchased in
the current year. A total of 48 properties have been purchased this year,
which exceeds the target of 30 properties. 
7.6 On the Triple Glazing Programme, additional addresses have been identified
that require an upgrade to their windows. It is proposed that £1.5 million is
transferred from SHQS Future Developments in 2026/27 with £1.2 million
allocated to 2023/24 and £300,000 in 2024/25. These movements also take
account of some properties which were previously identified for triple glazing
but not actioned due to access difficulties. Following considerable work by
tenant liaison officers, access has now been achieved and the installations
have commenced. 
Page 62 of 104

Page 63

7.7 The following rephasings/virements are also proposed: 
Project 2023/24
£m
2024/25
£m
Later
Years
£m
Description
Heating Upgrade
Contract Works
0.215 (0.215) 0.000 Accelerate due to improved
access rates and addresses
now certified that were
previously missing
completion certificates.
Rewiring,
Infrastructure &
Property
Refurbishment
(0.850) 0.000 0.850 Based on current level of
work completed in year.
Environmental
Improvements
0.150 0.000 0.000 Fund anticipated costs at
Pullar Terrace and
additional works to drainage
work at Firbank Road.
SHQS Future
Developments 
0.000 0.000 (0.150)
Fire Precaution
Measures
(0.224) 0.224 0.000 Delay to completing contract
due to access issues
requiring forced access and
delays to additional smoke
detector fittings.
Sound insulation (0.289) 0.289 0.000 No works were identified in
2023/24.
Structural (0.463) 0.000 0.463 Minimal works undertaken in
2023/24, moved to future
years.
Anchor House,
Rannoch Road
(0.060) 0.060 0.000 No further works to be
carried out in 2023/24.
Shops & Offices (0.239) 0.000 0.239 No works identified for
2023/24.
Upgrade and
Replacement to Lift
Programme
(0.116) 0.116 0.000 No works identified for
2023/24.
ICT Expenditure (0.110) 0.000 0.110 Moved to 2025/26 based on
latest projections. 
7.8 Third party contributions of £35,000 have been received towards External
Fabric works in 2023/24 and the expenditure budget has therefore been
increased accordingly. Similarly, the Scottish Government have provided a
grant of £71,000 towards Double Dykes Chalet Replacement resulting in an
increase to the expenditure budget by the same amount in 2023/24. 
7.9 The above proposed adjustments, together with other smaller adjustments
within Appendix III, do not impact the borrowing requirement over the 5-year
programme. However, there is an increase in Capital Funded from Current
Revenue (CFCR) of £0.28 million in 2023/24, as reported in the Revenue
Monitoring Report at this Committee meeting. 
Page 63 of 104

Page 64

7.10 The Housing & Social Wellbeing Committee also approved a reduction in
CFCR of £1.398 million over the years 2024/25 to 2027/28 in January 2024,
together with the additional £4 million allocated to Council House Buy-Backs.
This increased the borrowing requirement for the overall programme by
£5.398 million, which is offset by the increased CFCR above and an increase
in capital receipts of £3,000 in the current year, resulting in a net total
borrowing requirement of £85.819 million over the 5-year programme. 
8. BUDGET OVERVIEW 
8.1 The projected net expenditure outturn in 2023/24 for the Composite Capital
Budget is £136.557 million and represents 77% of the original 2023/24
budget approved on 26 April 2023 (£178.033 million). The revised budget is
based on the latest projections of expenditure and all budget adjustments
outlined within this report. 
8.2 Net expenditure to 29 February 2024 on the Composite Capital Budget is
£114.604 million and represents 84% of the proposed revised budget for
2023/24 of £136.557 million. The actual expenditure does not include
accrued expenditure or provision for works certified as completed. All such
expenditure is accounted for when preparing the final outturn as at 31 March
2024. 
8.3 The projected net expenditure outturn in 2023/24 for the Housing Investment
Programme is £19.249 million and represents 94% of the original 2023/24
budget approved on 26 April 2023 (£20.422 million). 
8.4 Net expenditure to 29 February 2024 on the Housing Investment Programme
is £18.863 million which represents 98% of the proposed revised budget for
2023/24 of £19.249 million. 
8.5 The Council’s total Borrowing Requirement to 29 February 2024, based on the
Composite and Housing Investment Programmes, is £112.235 million. The
estimated overall Council Borrowing Requirement for 2023/24 as a whole has
reduced by £32.056 million to £126.74 million as a result of the monitoring
adjustments reflected within this report. This mostly reflects updated cashflow
estimates on larger contracts as the year-end approaches. Over the whole 5-
year programme, there is an increase of £5.2 million in the overall level of
borrowing on the Composite Programme relating to Communities Prudential
Borrowing projects, and an increase in borrowing of £5.115 million on the
Housing Investment Programme relating to Council House Buy-Backs and
adjustments to CFCR. 
8.6 While the projections have been based on a comprehensive monitoring
exercise, they continue to remain subject to uncertainty due to ongoing
inflationary pressures in the current economic environment. 
Author(s)
Name  Designation Contact Details
John Jennings Senior Accountant  CHXFinance@pkc.gov.uk 
Page 64 of 104

Page 65

Approved 
Name Designation Date 
Scott Walker 
Clare Mailer 
Strategic Lead – Finance
& Business Support 
Director (Strategy, People
& Resources) 
17 April 2024 
Page 65 of 104

Page 66

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report. 
Page 66 of 104

Page 67

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Chief Executive and the Executive Directors have been consulted in the
preparation of this report.   
Page 67 of 104

Page 68

2. BACKGROUND PAPERS 
No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix I – Composite Capital Programme - Estimated Capital Resources
2023/24 to 2027/28
Appendix II – Composite Capital Programme - Summary of Capital Resources
and Expenditure 2023/24 to 2027/28        
Appendix III – HRA Capital Investment Programme – Summary of Capital
Resources and Expenditure 2023/24 to 2027/28 
Appendix IV – Significant Capital Projects Progress Update
Page 68 of 104

Page 69

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2023/24 to 2027/28
APPENDIX I
Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources
2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget
Capital Grants
Cycling, Walking & Safer Routes (CWSR) 1,312 664 200 200 200 2,576
Recycling Improvement Fund 2,363 0 0 0 0 2,363
Cross Tay Link Road - Transport Scotland 15,000 0 0 0 0 15,000
Inspiring School Age Childcare Spaces 105 0 0 0 0 105
General Capital Grant 22,699 24,078 12,639 18,008 12,150 89,574
Total Capital Grants 41,479 24,742 12,839 18,208 12,350 109,618
General Capital Receipts
General Fund - Capital Receipts 801 419 656 250 250 2,376
General Fund - Ring Fenced Receipts 443 500 352 902 1,047 3,244
Total General Capital Receipts 1,244 919 1,008 1,152 1,297 5,620
Commercial Property Receipts
Capital Receipts brought-forward 2,245 1,872 1,120 1,550 1,550 2,245
Commercial Property Capital Receipts 0 712 430 0 1,088 2,230
Capital Receipts carried-forward (1,872) (1,120) (1,550) (1,550) (2,638) (2,638)
Total Commercial Property Receipts Applied 373 1,464 0 0 0 1,837
Contributions
Tay Cities Deal 271 999 550 505 2,946 5,271
Third Party Contributions 1,944 671 0 2,000 3,000 7,615
Developer Contributions 2,847 2,300 2,367 2,600 2,600 12,714
Revenue Budget Contributions 143 50 125 125 0 443
Total Contributions 5,205 4,020 3,042 5,230 8,546 26,043
Capital Borrowing Requirement 109,837 169,923 74,024 81,816 100,221 535,821
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 158,138 201,068 90,913 106,406 122,414 678,939
6
Page 69 of 104

Page 70

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2023/24 to 2027/28
APPENDIX I
Movements in Resources from Approved Budget - 31 January 2024
Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget
2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000
New Resources approved 28 February 2024 (6,351) 8,473 22,053 17,562 7,800 49,537
Increase/(Decrease) in:
Capital Receipts - General Fund (103) 141 (38) 0 0 0
Capital Receipts - Commercial Property 0 0 0 0 0 0
Capital Receipts - Ring Fenced (70) 148 0 0 0 78
Capital Grants:
Cycling, Walking & Safer Routes (CWSR) 0 0 0 0 0 0
Road Safety Improvement Fund 0 0 0 0 0 0
Regeneration Fund 0 0 0 0 0 0
Recycling Improvement Fund 0 0 0 0 0 0
Cross Tay Link Road - Transport Scotland 0 0 0 0 0 0
Inspiring School Age Childcare Spaces 0 0 0 0 0 0
General Capital Grant 0 0 0 0 0 0
Tay Cities Deal 4 0 0 0 0 4
Third Party Contributions 214 13 0 0 0 227
Revenue Contributions 51 (74) 0 0 0 (23)
Developer Contributions 0 0 0 0 0 0
Resources b/f 0 1,256 0 0 0 1,256
Resources c/f to future years (1,256) 0 0 0 0 (1,256)
Borrowing Requirement (25,533) (7,984) (28,354) 16,035 51,036 5,200
Total Increase/(Decrease) in Resources (33,044) 1,973 (6,339) 33,597 58,836 55,023
Approved Resources 31 January 2024 191,182 199,095 97,252 72,809 63,578 623,916
Revised Resources 158,138 201,068 90,913 106,406 122,414 678,939
Page 70 of 104

Page 71

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Approved Approved Proposed Revised Actuals Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment Adjustment 29-Feb-24
Report 3 28-Feb-24 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES 56,744 0 (3,301) 53,443 39,656 53,443 66,456 26,894 21,904 22,223 190,920
COMMUNITIES 102,371 (6,351) (22,582) 73,438 68,953 73,438 112,513 52,793 71,752 79,436 389,932
HEALTH AND SOCIAL CARE 1,303 0 (250) 1,053 557 1,053 2,186 1,391 1,390 1,306 7,326
CORPORATE AND DEMOCRATIC SERVICES 9,382 0 (759) 8,623 5,438 8,623 17,029 8,608 7,628 12,256 54,144
TOTAL NET EXPENDITURE 169,800 (6,351) (26,892) 136,557 114,604 136,557 198,184 89,686 102,674 115,221 642,322
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (22,699) 0 0 (22,699) (20,179) (22,699) (24,078) (12,639) (18,008) (12,150) (89,574)
DEVELOPER CONTRIBUTIONS (2,847) 0 0 (2,847) 0 (2,847) (2,300) (2,367) (2,600) (2,600) (12,714)
CAPITAL RECEIPTS (504) (400) 103 (801) (291) (801) (1,131) (1,086) (250) (1,338) (4,606)
ANNUAL BORROWING REQUIREMENT 143,750 (6,751) (26,789) 110,210 94,134 110,210 170,675 73,594 81,816 99,133 535,428
CAPITAL RECEIPTS BROUGHT FORWARD (2,245) 0 0 (2,245) (2,245) (2,245) (1,872) (1,120) (1,550) (1,550) (2,245)
CAPITAL RECEIPTS CARRIED FORWARD 616 0 1,256 1,872 1,494 1,872 1,120 1,550 1,550 2,638 2,638
TOTAL NET BORROWING REQUIREMENT 142,121 (6,751) (25,533) 109,837 93,383 109,837 169,923 74,024 81,816 100,221 535,821
6
Page 71 of 104

Page 72

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment Adjustment 29-Feb-24
Report 3 28-Feb-24 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
EDUCATION AND CHILDREN'S SERVICES
MIS - SEEMIS Licensing 745 745 147 745 0 0 0 0 745
Blairgowrie Recreation Centre - Replacement 16,374 16,374 12,180 16,374 13,150 4,003 0 0 33,527
Schools Modernisation Programme
Investment in the Learning Estate 1,491 243 1,734 1,345 1,734 10,145 8,550 8,650 6,823 35,902
Scottish Govt. Grant (Inspiring School Age Childcare Spaces) (105) (105) (105) 0 0 0 0 (105)
Free School Meal Expansion Programme 1,348 1,348 1,348 2,000 0 0 0 3,348
Methven Primary School Refurbishment 124 119 243 45 243 21 0 0 0 264
Breadalbane Academy, Aberfeldy - 3G Pitch 29 29 18 29 0 0 0 0 29
Third Party Contribution (The Scottish Football Association) (29) (29) (14) (29) 0 0 0 0 (29)
Kirkmichael Primary School Upgrades 0 0 6 0 32 0 0 0 32
Capital Receipt (ring-fenced) (128) (128) (127) (128) 0 0 0 0 (128)
Early Learning & Childcare 0 0 0 0 0 0 0 0
- Oakbank Primary School Upgrade Project 12 12 12 12 0 0 0 0 12
- Rattray Primary School Upgrade Project 155 155 91 155 0 0 0 0 155
New Primary School at Bertha Park Site 559 159 718 473 718 0 341 7,500 15,400 23,959
Riverside Primary New School 3,410 3,410 2,767 3,410 0 0 0 0 3,410
Technology Upgrades 128 128 23 128 1,016 250 0 0 1,394
Perth Academy - Refurbishment 2,311 755 3,066 2,525 3,066 1,745 1,650 1,650 0 8,111
Perth Grammar School - Upgrade Programme Phase 3 849 263 1,112 603 1,112 1,857 1,500 504 0 4,973
Perth High School - Internal Services & Refurbishment 16 16 4 16 0 0 0 0 16
Perth High School - New School Investment 25,244 (4,840) 20,404 15,788 20,404 36,340 10,600 3,600 0 70,944
Harris Academy/Invergowrie - Extension 4,211 4,211 3,770 4,211 150 0 0 0 4,361
TOTAL: EDUCATION AND CHILDREN'S SERVICES 56,744 0 (3,301) 53,443 39,656 53,443 66,456 26,894 21,904 22,223 190,920
COMMUNITIES
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc..) 0 34 34 1 34 328 362 362 361 1,447
Road Safety Initiatives - A94 Safety Improvements 0 0 0 84 0 0 0 84
Additional Road Safety - Pedestrian Crossings 0 0 0 153 153 153 0 459
Schools Road Safety Measures 488 488 433 488 0 0 0 0 488
Scottish Government Grant - CWSS (66) 66 0 0 0 0 0 0 0
20mph Signage Programme - Schools 10 10 1 10 119 0 0 0 129
20mph Signage Programme 76 76 35 76 0 0 0 0 76
Cycling Walking & Safer Routes (CWSR) 1,396 66 1,462 811 1,462 664 200 200 200 2,726
Scottish Government Grant - CWSR (1,246) (66) (1,312) (646) (1,312) (664) (200) (200) (200) (2,576)
Third Party Contribution (TACTRAN) (150) (150) (150) 0 0 0 0 (150)
Car Parking Investment 356 40 396 255 396 0 0 0 0 396
Revenue Contribution (65) (40) (105) (65) (105) 0 0 0 0 (105)
Car Parking Investment - Pitlochry 0 0 0 150 0 0 0 150
Sub-Total 799 0 100 899 825 899 834 515 515 361 0 3,124
Asset Management - Roads & Lighting
Structural Maintenance 12,114 (746) 11,368 10,100 11,368 10,420 9,498 9,706 7,500 48,492
Third Party Contribution (Forestry Commission Timber Routes) (299) (91) (390) (299) (390) 0 0 0 0 (390)
Third Party Contribution (14) (85) (99) (14) (99) 0 0 0 0 (99)
Traffic Signal Renewals - Upgrading 73 (69) 4 4 169 100 100 100 473
Footways 578 77 655 602 655 390 390 390 393 2,218
Investment in Local Footpaths 0 0 0 0 60 100 0 160
Road Safety Barriers 22 (22) 0 0 22 0 0 0 22
Sub-Total 12,474 0 (936) 11,538 10,389 11,538 11,001 10,048 10,296 7,993 50,876
Page 72 of 104

Page 73

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment Adjustment 29-Feb-24
Report 3 28-Feb-24 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Asset Management - Bridges
Bridge Refurbishment Programme 1,536 (264) 1,272 758 1,272 1,736 2,221 2,520 3,201 10,950
Vehicular Bridge Parapets Programme - Assess & Upgrade 0 0 1 0 35 0 0 0 35
Old Perth Bridge - Strengthening 190 (140) 50 50 50 2,469 0 0 2,569
Perth Queens Bridge - Strengthening 335 (83) 252 4 252 143 70 2,153 0 2,618
Garry Viaduct 110 (72) 38 38 372 300 1,900 1,790 4,400
Culteuchar Culvert 391 42 433 293 433 20 0 0 0 453
Sub-Total 2,562 0 (517) 2,045 1,056 2,045 2,356 5,060 6,573 4,991 21,025
Improvement Schemes
A9/A85 Road Junction Improvements 270 (213) 57 52 57 213 0 0 0 270
Cross Tay Link Road (CTLR) 72,842 (15,057) 57,785 46,970 57,785 41,270 0 0 0 99,055
Scottish Government Grant (15,000) (15,000) (15,000) 0 0 0 0 (15,000)
Bertha Park Link Road 0 324 324 324 668 400 10,000 1,808 13,200
A977 Upgrades 350 17 367 323 367 173 0 0 0 540
Brioch Road, Crieff - Road Realignment & Safety Measures 31 31 13 31 0 0 0 0 31
Sub-Total 58,493 0 (14,929) 43,564 47,358 43,564 42,324 400 10,000 1,808 98,096
Public Transport
Community Transport Iniaitives 199 (199) 0 0 199 0 0 0 199
Sub-Total 199 0 (199) 0 0 0 199 0 0 0 0 199
Rural Flood Protection Schemes
Almondbank Flood Protection Scheme 17 17 16 17 0 0 0 0 17
Perth Flood Protection Scheme (South Inch Culvert Reinstatement 354 (262) 92 84 92 262 0 0 0 354
Comrie Flood Protection Scheme 7,385 (6,233) 121 1,273 480 1,273 10,310 15,420 8,800 0 35,803
Milnathort Flood Protection Scheme 79 (28) 51 9 51 229 83 0 0 363
South Kinross Flood Protection Scheme 225 26 251 189 251 412 1,783 8,823 3,225 14,494
Scone Flood Protection Scheme 90 (90) 0 0 50 69 68 580 767
Flood Mitigation Measures - Dunkeld and Craigie Burn 0 0 0 1,000 0 0 0 1,000
Coastal Change Adaptation 100 (100) 0 0 100 0 0 0 100
Sub-Total 8,250 (6,351) (215) 1,684 778 1,684 12,363 17,355 17,691 3,805 52,898
Perth & Kinross Place-making
Mill Street Environmental Improvements 127 (78) 49 50 49 0 0 0 0 49
Perth, Place, People 3,598 (3,598) 0 0 3,598 0 0 0 3,598
Perth City Centre Golden Route (Rail Station) 11 40 51 13 51 38 0 0 0 89
City Greening 31 (31) 0 0 31 0 0 0 31
Perth & Kinross Lighting Action Plan 1,071 (433) 638 322 638 1,110 0 0 0 1,748
Sub-Total 4,838 0 (4,100) 738 385 738 4,777 0 0 0 5,515
Other Planning Projects
Creative Exchange (former St. John's Primary School) 53 53 53 0 0 0 0 53
Local Full Fibre Network 22 4 26 5 26 0 0 0 0 26
Third Party Contribution - Tay Cities Deal 0 (4) (4) (58) (4) 0 0 0 0 (4)
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 429 429 436 429 0 0 0 0 429
Third Party Contribution - ERDF (162) (162) (160) (162) 0 0 0 0 (162)
Third Party Contribution - Tay Cities Deal (267) (267) (253) (267) 0 0 0 0 (267)
Perth Eco-Innovation Park at Perth West 0 0 0 23,800 9,017 0 0 32,817
Third Party Contributions - Tay Cities Deal 0 0 0 (999) (550) (505) (2,946) (5,000)
Other Third Party Contributions 0 0 0 0 0 (2,000) (3,000) (5,000)
Capital Receipts - Ring Fenced Land Disposals 0 0 0 0 0 (550) (725) (1,275)
Economic Development Investment - Land & Serviced Units 0 0 0 1,000 1,000 0 0 2,000
Nature Restoration 386 386 49 386 0 0 0 0 386
Sub-Total 461 0 0 461 19 461 23,801 9,467 (3,055) (6,671) 24,003
Page 73 of 104

Page 74

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment Adjustment 29-Feb-24
Report 3 28-Feb-24 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
City Centre Developments - Cultural Attractions
Perth Museum 2,368 2,368 1,456 2,368 0 0 0 0 2,368
Perth Art Gallery 3,272 3,272 245 3,272 0 0 0 0 3,272
PH2O 0 0 0 500 2,000 25,000 62,500 90,000
Sub-Total 5,640 0 0 5,640 1,701 5,640 500 2,000 25,000 62,500 95,640
Community Planning
Letham Community Wellbeing Hub 1,571 1,571 1,158 1,571 0 0 0 0 1,571
Third Party Contribution (Letham4All) (519) (519) (482) (519) 0 0 0 0 (519)
Adapt Your Property - Vacant Town & City Centre Space 0 0 0 300 0 0 0 300
Community-Led Asset Transfers 0 0 0 75 0 0 0 75
Sub-Total 1,052 0 0 1,052 676 1,052 375 0 0 0 1,427
Community Greenspace
Play Areas - Improvements Implementation Strategy 383 40 423 77 423 973 561 150 150 2,257
Third Party Contribution (10) (10) (6) (10) 0 0 0 0 (10)
3G Pitch, Blairgowrie 3 3 3 3 117 0 0 0 120
Settlement/Neighbourhood Parks 25 1 26 26 429 0 0 0 455
Countryside Sites 0 0 0 139 0 0 0 139
Community Greenspace Sites 0 0 1 0 306 450 898 894 2,548
Community Greenspace Bridges 27 11 38 9 38 100 0 0 0 138
Third Party Contribution 0 0 0 (13) 0 0 0 (13)
Revenue Contribution 0 (11) (11) (11) 0 0 0 0 (11)
Core Path Implementation 9 36 45 3 45 0 0 0 0 45
Third Party Contribution (21) (24) (45) (45) 0 0 0 0 (45)
Premier Parks 8 20 28 28 0 0 0 0 28
Third Party Contribution 0 (14) (14) (14) 0 0 0 0 (14)
Auchterarder Public Park 30 (4) 26 19 26 0 0 0 0 26
The Knock 0 0 0 0 0 0 0 0
Third Party Contribution (3) (3) (3) 0 0 0 0 (3)
Kinnoull Hill 8 (8) 0 0 8 0 0 0 8
Third Party Contribution (4) (4) (7) (4) 0 0 0 0 (4)
Cemetery Extensions 20 20 16 20 60 229 225 375 909
Sub-Total 475 0 47 522 115 522 2,119 1,240 1,273 1,419 6,573
Waste Strategy
Recycling Improvement Fund 2,363 2,363 2,104 2,363 0 0 0 0 2,363
Scottish Government Grant (2,363) (2,363) 0 (2,363) 0 0 0 0 (2,363)
Sub-Total 0 0 0 0 2,104 0 0 0 0 0 0
Support Services
PC Replacement & IT Upgrades
Hardware 16 16 7 16 15 15 14 14 74
Licenses 152 152 83 152 112 95 71 71 501
Sub-Total 168 0 0 168 90 168 127 110 85 85 575
Commercial Property Investment Programme
North Muirton Industrial Estate - Site Servicing & Provision of Units 57 57 57 0 0 0 0 57
Broxden Business Park - Additional Infrastructure 10 10 10 0 0 0 0 10
Western Edge, Kinross - Site Servicing 5 5 5 0 0 0 0 5
Broxden Drainage Mitigation Works 638 638 742 638 866 0 0 0 1,504
Third Party Contribution (Scottish Water) (470) (470) (470) (658) 0 0 0 (1,128)
Ruthvenfield Business Centre 1,372 (1,256) 116 9 116 1,256 0 0 0 1,372
North Muirton Drainage 17 17 17 0 0 0 0 17
Sub-Total 1,629 0 (1,256) 373 751 373 1,464 0 0 0 1,837
Page 74 of 104

Page 75

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment Adjustment 29-Feb-24
Report 3 28-Feb-24 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins 203 (58) 145 125 145 258 200 200 200 1,003
Wheeled Bin Replacement Programme - Commercial Bins 208 (37) 171 171 57 20 20 20 288
Recycling Containers, Oil Banks & Battery Banks Replacement Pro 205 205 102 205 120 105 105 105 640
Capital Receipts - Disposals (9) (9) (7) (9) 0 0 0 0 (9)
Litter Bins 25 25 25 25 50 50 50 50 225
Smart Cities - Smart Waste 45 45 46 45 0 0 0 0 45
Third Party Contribution (ERDF) (24) (24) (24) 0 0 0 0 (24)
Vehicle Replacement Programme 3,813 (113) 3,700 2,084 3,700 8,031 2,800 2,800 2,500 19,831
Capital Receipts - Vehicle Disposals (376) 70 (306) (188) (306) (500) (352) (352) (322) (1,832)
Street Lighting Renewal - LED & Column Replacement 804 (30) 774 505 774 898 835 551 592 3,650
LED Traffic Signal Replacement 4 4 4 4 0 0 0 0 4
Almondbank Flood Protection Scheme 3 3 3 0 0 0 0 3
Land Purchase & Development (Hotel Development) 0 0 0 950 950 0 0 1,900
Sub Total 4,901 0 (168) 4,733 2,696 4,733 9,864 4,608 3,374 3,145 25,724
Housing Projects
Gypsy Travellers Site Improvement Works 195 (184) 11 10 11 184 0 0 0 195
Additional Gypsy Traveller Site Improvement Works 225 (225) 0 0 225 0 0 0 225
New Gypsy Traveller Site 10 10 10 0 1,990 0 0 2,000
Sub Total 430 0 (409) 21 10 21 409 1,990 0 0 2,420
TOTAL: COMMUNITIES 102,371 (6,351) (22,582) 73,438 68,953 73,438 112,513 52,793 71,752 79,436 0 389,932
Health & Social Care
Occupational Therapy Equipment 250 100 350 350 250 250 250 150 1,250
Technology Enabled Telecare 1,000 (350) 650 503 650 1,625 1,088 1,087 1,087 5,537
Moving & Handling Office Refurbishment 0 0 0 29 0 0 0 29
Software Licences 53 53 54 53 53 53 53 69 281
Developing Supported Tenancies 0 0 0 229 0 0 0 229
TOTAL: HEALTH & SOCIAL CARE 1,303 0 (250) 1,053 557 1,053 2,186 1,391 1,390 1,306 7,326
CORPORATE AND DEMOCRATIC SERVICES
Property Services
DDA Adaptation & Alteration Works Programme 410 (10) 400 278 400 210 200 200 200 1,210
Property Compliance Works Programme 902 (327) 575 398 575 727 650 650 650 3,252
Third Party Contribution (LAL) (25) (25) (25) (25) 0 0 0 0 (25)
Capital Improvement Projects Programme 2,275 (238) 2,037 1,342 2,037 2,038 1,800 1,800 894 8,569
Pitlochry High School - Upgrade Programme 316 (136) 180 119 180 136 0 0 0 316
Friarton Depot - Waste Transfer Station 0 0 0 2,250 750 0 0 3,000
Community Campus Access Adaptations 0 0 0 25 0 0 0 25
Energy Efficiency Works - Various Properties 27 27 27 27 0 0 0 0 27
Revenue Contribution (Salix Reserve) (27) (27) (27) 0 0 0 0 (27)
Decarbonisation - Prudential Borrowing Programme (PB) 700 (150) 550 281 550 1,450 0 0 0 2,000
Energy Conservation & Carbon Reduction Programme (PB) 138 138 67 138 150 150 150 150 738
Information Systems & Technology
ICT Infrastructure Replacement and Upgrade Programme 2,416 2,416 1,879 2,416 6,745 3,077 3,076 7,757 23,071
Data & Analytics 600 600 205 600 806 946 720 708 3,780
Supporting Digital 750 (50) 700 99 700 963 927 928 1,185 4,703
Software Licences (Revenues & Benefits) 50 2 52 52 52 51 51 51 49 254
School Audio-Visual (AV) Equipment Replacement Programme 50 50 26 50 173 35 35 35 328
Mosaic - Swift Social Work System Replacement 800 150 950 690 950 1,355 147 143 628 3,223
Revenue Contribution 0 0 0 (50) (125) (125) 0 (300)
TOTAL: CORPORATE AND DEMOCRATIC SERVICES 9,382 0 (759) 8,623 5,438 8,623 17,029 8,608 7,628 12,256 54,144
Page 75 of 104

Page 76

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment Adjustment 29-Feb-24
Report 3 28-Feb-24 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
TOTAL COMPOSITE NET EXPENDITURE 169,800 (6,351) (26,892) 136,557 114,604 136,557 198,184 89,686 102,674 115,221 642,322
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
CAPITAL RECEIPTS
General Capital Grant - Scottish Government (22,699) (22,699) (20,179) (22,699) (24,078) (12,639) (18,008) (12,150) (89,574)
Developer Contributions (2,847) (2,847) (2,847) (2,300) (2,367) (2,600) (2,600) (12,714)
General Fund - Capital Receipts/Disposal (504) (400) 103 (801) (291) (801) (419) (656) (250) (250) (2,376)
Commercial Property - Capital Receipts/Disposal 0 0 0 0 0 (712) (430) 0 (1,088) (2,230)
Total: Capital Receipts (26,050) (400) 103 (26,347) (20,470) (26,347) (27,509) (16,092) (20,858) (16,088) (106,894)
Annual Composite Borrowing Requirement 143,750 (6,751) (26,789) 110,210 94,134 110,210 170,675 73,594 81,816 99,133 535,428
CAPITAL RECEIPTS BROUGHT FORWARD (2,245) 0 (2,245) (2,245) (2,245) (1,872) (1,120) (1,550) (1,550) (2,245)
CAPITAL RECEIPTS CARRIED FORWARD 616 1,256 1,872 1,494 1,872 1,120 1,550 1,550 2,638 2,638
TOTAL NET COMPOSITE BORROWING REQUIREMENT142,121 (6,751) (25,533) 109,837 93,383 109,837 169,923 74,024 81,816 100,221 535,821
Page 76 of 104

Page 77

EDUCATION AND CHILDREN'S SERVICES
Project Project Description
MIS - SEEMIS Licensing Licencing of Schools Management Information System
Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie
Investment in the Learning Estate Investment to upgrade the infrastructure and environment of our
existing school estate
Free School Meal Expansion Programme Upgrading kitchen and dining facilities to provide the enhanced
Free School Meals programme
Methven Primary School Refurbishment Upgrade of Methven Primary School facilities
Breadalbane Academy, Aberfeldy - 3G Pitch Additional investment required to upgrade 2G to 3G
Kirkmichael Primary School Upgrades Upgrade of Kirkmichael Primary School facilities
Early Learning & Childcare
- Letham Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure -
Completed
- Oakbank Primary School Upgrade Project 1140 hrs project - Completed
- Rattray Primary School Upgrade Project 1140 hrs project plus upgrade of primary school infrastructure -
Completed
New Primary School at Bertha Park Site New primary school located at Bertha Park
Riverside Primary New School Replacement of North Muirton and Balhousie primary schools
Technology Upgrades Upgrade to practical teaching environment within the existing
school estate
Perth Academy - Refurbishment
Investment to upgrade the infrastructure and environment of the
Perth Academy including structural work to sports block, lighting
upgrades, classroom upgrades and science block cladding
Perth Grammar School - Upgrade Programme Phase
3
Investment to upgrade the infrastructure and environment of the
Perth Grammar School including structural work to assembly hall,
AV and WiFi upgrades, classroom refurbishment and door
upgrades
Perth High School - Internal Services &
Refurbishment
Necessary works to the infrastructure and environment of the
current Perth High School
Perth High School - New School Investment Replacement of the existing Perth High School
Harris Academy/Invergowrie - Extension Extension and reconfiguration of existing space at Harris Academy
in Dundee for continuation of access for pupils based in
Invergowrie
COMMUNITIES
Project Project Description
Traffic & Road Safety
Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety
Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing facilities
Road Safety Improvement Fund works Provision of safety barriers on routes where motor cycling is
common
Schools Road Safety Measures A programme of works to improve road safety in the vicinity of
schools
20mph Signage Programme - Schools A programme of works to improve road safety in the vicinity of
schools
20mph Signage Programme A programme of works to introduce 20mph speed limits.
Cycling Walking & Safer Routes (CWSR) A programme of works providing infrastructure for cycling, walking
and safer routes
Car Parking Investment Construction of new car park in Auchterarder
Car Parking Investment - Pitlochry Purchase of land and construction of a public car park
Strathmore Cycle Network Contribution towards a shared use path between Coupar Angus
and Blairgowrie
Asset Management - Roads & Lighting
Page 77 of 104

Page 78

Structural Maintenance
Road maintenance to extend the life of roads, including
predominately road resurfacing, surface dressings, installing new
drainage infrastructure and repairs to and replacement of
defective embankments and retaining walls
Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal
infrastructure
Footways Replacement of existing  deteriorated footway surfaces
Investment in Local Footpaths A programme of works to improve and provide local footpaths
Road Safety Barriers
Renewal of existing barriers where unrecoverable damage has
occurred and renewal of barriers where timber posts have been
used in construction
Bridge Refurbishment Programme
Used to appoint specialist external inspection teams and
consultants to carry out specialist access bridge inspections and
assessments
Dalhenzean Culvert Culvert replacement project (later years)
Dunkeld Golf Course Culvert replacement project (later years)
Vehicular Bridge Parapets Programme - Assess &
Upgrade Assessment and Upgrading of Vehicle Parapets Programme
Old Perth Bridge - Strengthening
Carry out works recommended by the 2018 Bridge Assessment
study, including a range of assessment, investigation,
strengthening and improvement works
Perth Queens Bridge - Strengthening
Carry out works recommended by the 2018 Bridge Assessment
study, including a range of assessment, investigation,
strengthening and improvement works
Garry Viaduct
Replacement of Bearings and Parapets; including strengthening of
deck for bearing replacement jacking up, and to cater for
increased parapet vehicular deterrent capacity
Culteuchar Culvert Replace existing temporary steel bridge (on hire) with culvert
Glendevon Bridge Major bridge repair works required due to severe river scour
damage (now complete)
Tullyfergus Bridge Installation of scour protection to protect existing bridge abutments
(later years)
A9/A85 Road Junction Improvements
New infrastructure including a new A9 overbridge, a bridge over
the River Almond and road linking the A85 to Inveralmond and
Bertha Park (Phase 1 of Perth Transport Futures Project) -
complete
Cross Tay Link Road (CTLR)
New road and major structure over the River Tay, linking the A9
north of Inveralmond and the A94 north of Scone (Phase 2 of
Perth Transport Futures Project).
A977 Upgrades A programme of works to improve road safety along the A977.
Broich Road, Crieff - Road Realignment & Safety
Measures Complete
Community Transport Iniaitives
Funded by the Community Bus Fund - expenditure to improve
connectivity and integrate transport modes,or to support innovative
transport solutions in areas of rural deprivation
Almondbank Flood Protection Scheme Substantially complete
Perth Flood Protection Scheme (Pump Replacement) Complete
Perth Flood Protection Scheme (South Inch Culvert
Reinstatement)
Ground investigation and monitoring then design project to
refurbish existing culvert
Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in Comrie
Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in Milnathort
Asset Management - Bridges
Improvement Schemes
Rural Flood Protection Schemes
Public Transport
Page 78 of 104

Page 79

South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in South Kinross
Scone Flood Protection Scheme Design and construction of a scheme to reduce the risk of flooding
in Scone
Coastal Change Adaptation Design and construct projects to deal with incidents of coastal
erosion
Mill Street Environmental Improvements
Potential compensation payments associated with claims against
compulsory land acquisition to enable delivery of environmental
improvements to stimulate and support development and
investment
Perth, Place, People
Design and development of sustainable transport corridors to
improve access to and from Perth and enable additional
development and improvement within Perth city centre
Perth City Centre Golden Route (Rail Station)
Design and development of improvements to access, signage and
animation from rail and bus station to Perth city centre to
complement improvements to integration of transport
City Greening
Improvements to support enhancement of retail trading
environment and residential areas and enhanced use of space for
markets, events and alfresco use
Perth & Kinross Lighting Action Plan
Architectural and creative lighting to enhance city and towns
appearance, reduce energy cost and increase safety at nighttime
to increase dwell time, support the hospitality sector, events and
grow the evening economy
Creative Exchange (former St. John's Primary
School)
Repurposing old school to offer space to creative industry
businesses and create the Famous Grouse Idea Centre, a space
to support business innovation.  Complete
Town Centre - Regeneration & Economic
Improvements Complete
Local Full Fibre Network
Provision of gigabit fibre connectivity to Council's buildings to
unlock gigabit connectivity for surrounding communities.
Completed
Low Carbon Transport & Active Travel Hub - Broxden
EV Chargers
Provision of fast EV chargers combined with solar power
generation and battery storage at Broxden Park & Ride - Near
completion
Perth Eco-Innovation Park at Perth West
Provision of enabling infrastructure (access road, A9 underpass
and unit platforms) to develop 25ha of employment land
supporting clean growth, business innovation and jobs - Phase 1
(11ha) - In development
Coupar Angus - Strathmore Community Hub Complete
Nature Restoration
Protection and restoration of biodiversity focusing on over-
exploitation of the natural environment and addressing its
consequences; habitat loss and fragmentation; and invasive non-
native species - 22/23 completed - 23/24 started
Perth Museum
Refurbishment of Perth City Hall to create new museum spaces
and cafe. Main construction phase complete and install/fit out on
schedule for planned opening spring 2024
Perth Art Gallery Refurbishment of temporary galleries - scheduled for completion
November 2023
Collections Centre Project removed from programme
PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink. On hold
pending outcome of Leisure and Culture Assets Review
Letham Community Wellbeing Hub
Refurbishment of Letham Wellbeing Hub to offer a range of
services to the local community managed by Letham4All -
scheduled for completion end 2023
City Centre Developments - Cultural Attractions
Community Planning
Other Planning Projects
Perth & Kinross Place-making
Page 79 of 104

Page 80

Play Areas - Improvements Implementation Strategy
Regular refurbishment of 146 play areas based on approx. 6-8 per
year.  Involves community engagement and often co-funding and
design of the sites
3G Pitch, Blairgowrie Two phase community led project to provide a new full sized 3G
football pitch and pavilion
Settlement/Neighbourhood Parks
Refurbishment of neighbourhood parks working in partnership with
communities to improve, update and renew worn out or obsolete
infrastructure
Countryside Sites Refurbishment of more natural parks and open spaces
Community Greenspace Sites
Main fund for all Community Greenspace Sites which is drawn
down to support the overall capital programme of refurbishments
and upgrades
Community Greenspace Bridges Refurbishment programme for all bridges on Community
Greenspace sites
Core Path Implementation Holding budget for Crieff Comrie Core path development mainly
funded through Sustrans
Alyth Environmental Improvements Town centre upgrade including community led refurbishment of
the burnside - complete
Premier Parks Small budget to facilitate refurbishment of former Premier Park
upgrades
Auchterarder Public Park Major play area upgrade co-funded and designed with the
community
The Knock Complete
Kinnoull Hill Complete
Cemetery Extensions Funding to allow the extension of existing or development of new
cemeteries to address the pressure for burial space
Recycling Improvement Fund External Scottish Government funding (Recycling Improvement
Fund) to roll out 4th bin to householders for recycling
Hardware Funding of additional or bespoke IT Hardware for Communities
Staff
Licenses Funding of software contracts
North Muirton Industrial Estate - Site Servicing &
Provision of Units Only road adoption works remaining
Broxden Business Park - Additional Infrastructure Only road adoption works remaining
Western Edge, Kinross - Site Servicing Only road adoption works remaining
Additional Infrastructure Investment - Broxden Complete
Broxden Drainage Mitigation Works Drainage/pumping station works underway and subject to
agreement/contribution from Scottish Water
Ruthvenfield Business Centre Works on redevelopment in progress
North Muirton Drainage Drainage/pumping station underway
North Muirton Industrial Estate Expansion Land -
Servicing Complete
Wheeled Bin Replacement Programme - Domestic
Bins
Replacement of damaged and end of life wheeled bins for
households. Also suppling bins for new properties
Wheeled Bin Replacement Programme - Commercial
Bins
Replacement of damaged and end of life wheeled bins for
commercial customers. Also suppling bins for new customers and
changes to collection contracts
Recycling Containers, Oil Banks & Battery Banks
Replacement Programme Replacement of damaged and end of life oil and battery banks
Litter Bins Replacement of damaged and end of life litter bins and/or for
general supply of litter bins where required.
Prudential Borrowing Projects
Community Greenspace
Waste Strategy
Support Services - PC Replacement & IT Upgrades
Commercial Property Investment Programme
Page 80 of 104

Page 81

Smart Cities - Smart Waste
Programme now complete - included introduction of In Cab
system for refuse vehicles, fill level sensors on city centre litter
bins
Vehicle Replacement Programme Fleet vehicle replacement programme
Crematorium - Abatement Works Complete
Street Lighting Renewal - LED & Column
Replacement
Street Lighting LED conversion and column replacement
programme
Smart Cities - Intelligent Street Lighting Complete
LED Traffic Signal Replacement Complete
Almondbank Flood Protection Scheme Under Rural Flood
Land Purchase & Development (Hotel Development) Development agreement secured and release of grant for heritage
subject to progression through planning and cost evidence
Technology & Innovation Incubator Units Complete
Gypsy Travellers Site Improvement Works Programme of works for improvements on Gypsy Traveller sites at
Bobbin Mill and Double Dykes
Additional Gypsy Traveller Site Improvement Works Additional funding to support improvements works programme on
Gypsy Traveller sites
Gypsy Traveller Site Community Improvement Works Funding from Gypsy Traveller Scottish Government Funding Bid
for replacement of chalets at Double Dykes
New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site
HEALTH & SOCIAL CARE
Project Project Description
Occupational Therapy Equipment Supply and install of occupational therapy equipment
Technology Enabled Telecare
Replacement of existing Community Alarm devices from analogue
to digital units prior to UK switch-off of analogue, as well as
ongoing rolling replacment programme.
Moving & Handling Office Refurbishment Refurbishment of space following relocation of the moving and
handling office
Software Licences Licences for various social care systems
Developing Supported Tenancies Cntribution towards health resettlemetn of Community Care clients
to be supported in the community
CORPORATE AND DEMOCRATIC SERVICES
Project Project Description
DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council Buildings - e.g.
Ramps/Lifts/Door Access/Accessible Toilets and Changing Areas
Property Compliance Works Programme
To ensure compliance with current and changing legislation
including - New Fire Alarms; Lighting; Wiring; Fire Protection
Works; Gas pipework within buildings and Roof Restraint safety
systems
Capital Improvement Projects Programme Roof Upgrades; Full internal refurbishment works; New Heating
Systems; Boilers and pipework; Structural Upgrades; Small
extensions; New Windows/Doors; New Fencing; New Cladding
Pitlochry High School - Upgrade Programme
Upgrades to Mechanical and Electrical Infrastructure, including
rewiring, heating and controls systems, replacement lighting and
consequential building works such as new ceilings, painting and
flooring
Friarton Depot - Waste Transfer Station
Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to reduce
energy cost across the property estate
Housing Projects
Property Services
Page 81 of 104

Page 82

Decarbonisation - Prudential Borrowing Programme
(PB)
This budget will support PKCs path to NetZero and focus primarily
on the de-carbonisation of heat and replacing inefficient direct
emissions heat sources
Energy Conservation & Carbon Reduction
Programme (PB) This budget is focused on works to reduce PKC energy
consumption and help achieve annual KPI energy reduction of 3%
ICT Infrastructure & Replacement and Upgrade
Programme
This Programme delivers the IT / digital environment, digital
resources and systems required by staff and young people. The
programme maintains, supports and develops computers;
networks; telephony; Microsoft systems; connectivity and
equipment; datacentres; servers; file storage and back up; security
systems and video conferencing
Data & Analytics
Delivers the governance, tools, technologies and organisation-
wide skills required for optimising value from Council data, driving
informed decision making around resources, priorities and service
delivery targets
Supporting Digital
Develops the capabilities we need to be an innovative digital
organisation.  Including developing the Council’s corporate
employee (mobile working) and customer (online services)
platforms, to create new digital products and services; investment
in tools such as Microsoft; resourcing innovation and building
digital skills, insight and expertise
Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team
School Audio-Visual (AV) Equipment Replacement
Programme
Ensures all Perth and Kinross classrooms have equitable access
to audio visual panels and the digital skills to exploit these
resources for learning and teaching
Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system to
replace SWIFT
Information Systems & Technology
Page 82 of 104

Page 83

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment 29-Feb-24
Report 3 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House New Build Programme
Glebe, Scone - 65 Units 17 17 1 17 0 0 0 0 17   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
17 0 17 1 17 0 0 0 0 17
Huntingtower, Perth - 70 Units 1 1 1 0 0 0 0 1   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
1 0 1 0 1 0 0 0 0 1
Fairfield, Perth 251 251 195 251 0 0 0 0 251   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
251 0 251 195 251 0 0 0 0 251
Lynedoch Road, Methven - Phase 1 735 735 670 735 0 0 0 0 735   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
735 0 735 670 735 0 0 0 0 735
Lynedoch Road, Methven - Phase 2 0 1,334 1,334 1,106 1,334 1,172 0 0 0 2,506   
Council Tax (Second Income) 0 0 0 (240) 0 0 0 (240)
Scottish Government Subsidy 0 (1,243) (1,243) (1,243) 0 0 0 0 (1,243)
0 91 91 1,106 91 932 0 0 0 1,023
Future Developments 0 0 0 5,091 6,014 6,014 10,292 27,411   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
0 0 0 0 0 5,091 6,014 6,014 10,292 27,411
Total Council House New Build 1,004 91 1,095 1,972 1,095 6,023 6,014 6,014 10,292 29,438
Increase in Council House Stock
Council House Buy-Backs 5,067 1,867 6,934 6,772 6,934 4,000 4,000 4,000 4,000 22,934
Scottish Government Subsidy (1,050) (630) (1,680) (1,680) 0 0 0 0 (1,680)
4,017 1,237 5,254 6,772 5,254 4,000 4,000 4,000 4,000 21,254
Lock-ups and Garage Sites 0 0 0 50 0 0 0 50
Standard Delivery Plan
Heating Upgrade Contract Works 818 215 1,033 375 1,033 1,105 1,320 811 0 4,269
Rewiring, Infrastructure & Property Refurbishment 1,515 (850) 665 627 665 1,686 850 0 0 3,201
Triple Glazing 3,866 1,200 5,066 4,479 5,066 300 0 0 0 5,366 
- less Third Party Contribution 0 0 (1) 0 0 0 0 0 0
Controlled Door Entry 0 17 17 17 11 0 0 0 28
Kitchen Modernisation Programme 374 374 270 374 1,504 2,025 0 0 3,903
Bathroom Modernisation Programme 1,436 1,436 1,292 1,436 0 0 0 0 1,436
External Fabric 958 35 993 759 993 0 259 0 0 1,252 
- less Third Party Contribution 0 (35) (35) (35) (35) 0 0 0 0 (35)
Energy Efficiency 940 940 788 940 388 0 0 0 1,328
Multi Storey Flats 428 428 300 428 1,815 0 0 0 2,243
Environmental Improvements 899 150 1,049 775 1,049 0 0 0 0 1,049
Fire Precaution Measures 399 (224) 175 153 175 224 0 0 0 399
Sound Insulation 289 (289) 0 0 389 42 0 0 431
Structural 478 (463) 15 15 250 985 0 0 1,250
SHQS Future Developments 0 0 0 0 4,066 4,808 5,553 14,427
Total Standard Delivery Plan 12,400 (244) 12,156 9,782 12,156 7,672 9,547 5,619 5,553 40,547
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2023/24 to 2027/28
PERTH AND KINROSS COUNCIL
6
Page 83 of 104

Page 84

APPENDIX III
Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Adjustment 29-Feb-24
Report 3 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2023/24 2023/24 2023/24 2023/24 2023/24 2024/25 2025/26 2026/27 2027/28 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 82 82 60 82 22 0 0 0 104
Anchor House, Rannoch Road, Perth - Conversion (5 Unit 87 (60) 27 16 27 60 0 0 0 87
149-151 Dunkeld Road, Perth 277 277 107 277 0 0 0 0 277
111 Rannoch Road, Perth (Former Driving Test Centre) 8 8 8 0 0 0 0 8
St.Catherine's Square Redevelopment 16 (16) 0 0 3,393 0 0 0 3,393
Shops & Offices 239 (239) 0 0 50 239 0 0 289
Greyfriars and Satellite Sites 34 (32) 2 2 2 50 32 0 0 84
Sheltered Housing 11 11 12 11 0 0 0 0 11
Double Dykes Chalet Replacement 0 71 71 20 71 0 0 0 0 71 
- Scottish Government Grant 0 (71) (71) (71) 0 0 0 0 (71)
General Capital Works 120 120 112 120 0 0 0 0 120
Upgrade and Replacements to Lifts Programme 137 (116) 21 21 116 0 0 0 137
ICT Expenditure 131 (110) 21 8 21 50 110 0 0 181
Mortgage to Rent 175 175 175 50 0 0 0 225
Total Other Investment in Council House Stock 1,317 (573) 744 337 744 3,791 381 0 0 4,916
Total Net Expenditure 18,738 511 19,249 18,863 19,249 21,536 19,942 15,633 19,845 96,205
Income
CAPITAL RECEIPTS (8) (3) (11) (11) (11) 0 0 0 0 (11)
CFCR (2,055) (280) (2,335) (2,335) (1,833) (2,078) (2,004) (2,125) (10,375)
TOTAL BORROWING REQUIREMENT 16,675 228 16,903 18,852 16,903 19,703 17,864 13,629 17,720 85,819
Page 84 of 104

Page 85

SIGNIFICANT CAPITAL PROJECTS
PROGRESS UPDATE
APPENDIX IV
Project Title Total
Gross
Budget
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On Site Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement
36,000 0 36,000 36,000 Phase 1 completion
date December 2024,
phase 2 Easter 2025.
Yes Yes On track No Works are progressing well on-site.
New Primary School at
Bertha Park Site
24,000 0 24,000 24,000 Summer 2028 No No Rephased pending
review
No Rephasing of the project to take account of the
projections for the number of catchment pupils.
Riverside Primary New
School
19,899 0 19,899 19,899 June 2023 Yes Yes Complete Yes. Complete. Official opening 26 March 2024.
Perth High School - New
School Investment
80,200 0 80,200 80,200 Summer 2026 - school
building curently
scheduled to open
summer 2025
Yes Yes On track No Works are progressing on-site.
Harris
Academy/Invergowrie
Extension
5,200 0 5,200 5,200 Late 2023 Yes Yes On track No Main extension complete, reconfiguration works still to be
undertaken.
Cross Tay Link Road
(CTLR)
150,500 40,000 110,500 110,500 Spring 2025 Yes Yes On programme No Works progessing and remain on target for completion in
Spring 2025 as per the current programme. Bridge deck
works commenced in March 2024 with the first deck
segment concrete pours. Now that this is underway,
progress will be closely monitored to inform a detailed
analysis of available contingency and compensation
events which will give more certainty over the cost
forecasts (which are currently within budget).
Comrie Flood Protection
Scheme
39,544 0 39,544 39,544 Summer 2026 No No Advance works
complete; Main works
to be re-tendered April
2024
Yes Main works tender received in June 2023 but cost
significantly higher than anticipated; Finance have since
received confirmation from Scottish Government that the
capital grant will be increased to match the revised value
(equal to 80% of the project cost at tender stage) and the
Council's capital plan (for the remaining 20%) was
approved at Council Committee on 28/2/24. However,
the June 2023 tender has timed out.  Therefore, the main
works will be re-tendered in April 2024 with a tentative
start date of August 2024, subject to tender value
remaining within budget.  The works programme is
currently being reviewed with a duration of up to 2 years
(August 2026).Perth Eco Innovation Park* 32,817 11,275 21,542 21,542 Not currently
programmed
No No Preliminary design
works completed
Yes Procurement of the design consultant has progressed as
far as possible, but is put on hold pending full funding
package being in place. Discussions between PKC and
the developers on the required private sector contribution
levels are on-going to secure an indicative £13m. An
Outline Business Case has been submitted to secure
£5m from the Tay Cities Deal which would then be
subject to approval of Full Business Case. Further
evidence is being gathered to ensure that the identified
£5m from sale receipts are in line with market trends.
The above £23m contributions would complement the
£10m approved by the Council to meet the project total
estimated costs of £33m.
Perth Museum 27,232 10,300 16,932 16,932 Spring 2024 Yes Yes On track No Project complete and opened to public 30 March
PH2O 90,000 0 90,000 90,000 Not currently
programmed
No No Outline Business Case
reported to Council  23
February 2023, and
project on hold
pending review.
Yes Leisure assets review recommendations considered by
Council 22 Jan 2024 with instruction to re-scope PH20
and revert to Council Aug '24 with re-costed option.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 5-year programme.
6
Page 85 of 104

Page 86

Page 86 of 104

Page 87

PERTH & KINROSS COUNCIL 
Finance & Resources Committee
24 April 2024 
TREASURY ACTIVITY AND COMPLIANCE REPORT
2023/24 – 6 Months to 31 March 2024 
Report by Strategic Lead, Finance & Business Support
(Report No. 24/132) 
1. PURPOSE 
1.1 The purpose of this report is to update the Committee on Treasury Activity for
the period 1 October 2023 to 31 March 2024 and to report on compliance with
the Council’s Treasury Management Policy Statement (TMPS), Investment
Strategy and Prudential Indicators. 
2. RECOMMENDATION 
2.1 It is recommended that the Committee: 
(i) note the content of this report. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4:  Economic Background
• Section 5: Treasury Activity
• Section 6: Compliance
• Section 7: Investment Strategy Compliance and Performance
• Section 8: Prudential Indicators
• Section 9: Conclusion 
4. ECONOMIC BACKGROUND 
4.1 The Bank of England’s Monetary Policy Committee (MPC) maintained the UK
Bank Base Rate at 5.25% over the period despite a steady reduction in CPI
Inflation. Economic forecasts are that there will be reductions in the Base
Rate later in the year. UK inflation fell from 6.7% in September 2023 to 3.2%
in March 2024, which was the lowest rate since September 2021, primarily
due to a slowdown in food inflation and energy costs. Additionally, the core
inflation rate, which excludes volatile items such as energy and food costs,
also dropped. 
4.2 UK GDP (Gross Domestic Product) reduced by 0.3% at the end of 2023,
resulting in the UK entering a mild recession, the first time since the Covid-19
outbreak in 2020. More recent economic data suggests the UK has returned
to growth since the start of 2024. 
7
Page 87 of 104

Page 88

4.3 Internationally, the Eurozone experienced a contraction in growth of 0.1% in
the 3 months to 30 September 2023 and with no GDP growth in the quarter to
31 December. CPI Inflation continued to fall whilst interest rates were
maintained over the period at 4.5%. In the US, GDP fluctuated over the period
but increased overall, whilst inflation decreased over the period. The US
interest rate remained in the range of 5.25% to 5.50% in March 2024. 
4.4 The Public Works Loan Board’s (PWLB) certainty fixed interest rates for the 6
months to 31 March 2024, which are based on yields on UK gilts, are shown
in the graph at Appendix I. As a result of mixed economic data, borrowing
rates showed continuing volatility over the period, however the rates were
lower by the end of the period in all duration as inflation continued to ease. 
5.  TREASURY ACTIVITY 
5.1 A summary of the Council’s treasury position and transactions is shown at
Appendix II. The main activities are detailed below. 
5.2 During the period there were two new PWLB fixed maturity loans borrowed.
These were borrowed for medium term durations due to their relatively lower
rates, and with the expectation that longer term rates will fall over this period.
Details of the loans borrowed are as follows: 
• In December 2023, £20 million was borrowed for 6.5 years at 4.34%. This
was borrowed under the PWLB’s discounted HRA rate.
•   In March 2024, £10 million was borrowed for 4 years at 4.84%. 
5.3 There was no repayment of maturing PWLB loans, however the balance of
£140,000 on the Empty Homes Loan from the Scottish Government was
repaid in March. Therefore, the Council’s total long-term debt increased from
£598.34 million at an average interest rate of 2.55% to £628.2 million at an
average interest rate of 2.64% as at 31 March 2024. There was one short-
term market loan borrowed in the period to manage cashflow, with £10 million
borrowed for 7 days at 5.35% in November 2023. There were no such loans
outstanding as at 31 March 2024. 
5.4 Common Good and Charitable Fund balances held on fixed deposit with the
Loans Fund increased from £2.294 million, with an average interest rate at
3.95%, at 30 September 2023 to £2.415 million at an average rate of 4.81% at
the end of the current period. Funds held from associated bodies and
organisations decreased from £3.130 million to £2.248 million over the period,
in line with their own cash flow requirements, whilst the average rate paid on
these funds decreased from 4.69% to 4.58% in line with the rates applicable
on individual loans depending on the balance held. 
5.5 Short term cashflow surpluses are invested in a mixture of fixed term
deposits, instant access accounts and money market funds. All investments
were made in accordance with the approved Investment Strategy and
Permitted Investments. 
Page 88 of 104

Page 89

Fixed Term Deposits 
5.6 Cashflow surpluses which arise during the year, and which are not
immediately required, are generally invested in fixed term deposits for periods
of up to 12 months, or up to 3 years where forecast cashflow requirements
allow. 
5.7 There were 12 fixed rate deposits made in the 6 months to 31 March 2024
(totalling £62.5 million) at an average amount of £5.2 million and an average
interest rate of 6.53% for an average term of 27 days. In comparison to the
previous quarter to the end of September, fixed deposit activity in the current
period increased, however due to increased expenditure on the Capital
programme and cash requirements, the lending duration of investments was
shorter. The deposits were mainly to other Local Authorities and for very short
durations covering the financial year end when borrowing demand was high.
The average rate on investments in the current period also increased from
5.73% to 6.53%. The fixed deposits undertaken in the period will generate
£278,696 in interest at their maturity. 
Investments for Daily Cashflow Requirements  
5.8 Cashflow surpluses which are required for more immediate needs were
invested in the Council’s instant access and Money Market Funds. The
investment transactions in the period can be summarised as follows: 
• The daily average amount of such funds increased from £6.47 million in
the previous quarter to £6.95 million at the end of the current period. 
• The average interest rate achieved on these accounts over the period
increased from 5.14% to 5.32%. 
• Money Market Funds, which operate on instant access terms, were
used extensively over the period. The average amount invested
increased from £8.1 million in the previous quarter to £9.4 million in the
current period, whilst the average interest rate increased from 5.16% to
5.34%.
• The increase in activity on these accounts reflected the need to keep
an increased level of funds for more immediate cashflow purposes over
the period.
• Interest generated on these investments over the 6 month period
amounted to £391,776. 
5.9 The total amount of investments outstanding as at 31 March 2024 was
£65.533 million compared to £133.133 million at the end of September 2024.
The overall average rate of interest on the investments outstanding increased
from 5.34% to 6.48% over this period. This reflects increases in the available
rates over the period. 
5.10 Total income generated on investments undertaken during the period will total
£670,472 at maturity (£1,361,425 in the quarter ended 30 September 2023).
This measure reflects the total return on the investment activity undertaken in
the period and is lower in comparison to the previous quarter as fixed term
investments undertaken were for shorter durations, despite being at higher
Page 89 of 104

Page 90

interest rates and the current period being longer (6 months) in comparison to
the previous quarter (3 months). 
5.11 All of the above investment activities are consistent with the Council’s current
investment strategy and cashflow requirements. 
6. COMPLIANCE  
6.1 For the period ending 31 March 2024, there were no breaches in compliance
with the Council’s approved Treasury Management Policy Statement,
Treasury Management Practices (TMP’s) or lending limits as detailed in TMP
4 (Approved Instruments, Methods & Techniques).  
6.2 Appendix III shows the list of approved counterparties, based on the
Council’s current lending policy, as at March 2024.  
6.3 For the period ending 31 March 2024 the average closing cleared bank
balance was £19,274.59 in credit. This reflects the application of the Council’s
“sweep facility” operated by the bank, with any credit balance in excess of
£35,000 being “swept up” overnight to the Council’s instant access account. 
7. INVESTMENT STRATEGY COMPLIANCE AND PERFORMANCE  
7.1  The Treasury Investment Strategy for 2023/24 was approved by the Council
at its meeting on 10 May 2023 (report 23/135 refers).  
7.2 In the current period, the level of the Council’s investments peaked at
£151.575 million on 18 October 2023 and reduced to £65.533 million by the
end of March 2024. The average daily investment balance over the period
was £102.743 million, which decreased from an average of £155.355 million
in the previous quarter and from £221.754 million in the same period of last
year. This highlights the steady reduction in investment balances over the last
year as funds are applied in financing the approved Capital programme. 
7.3 The Investment Strategy was applied in full over the period, with liquidity
being maintained using instant access accounts and Money Market Funds as
detailed in paragraph 5.8 above. There were no other risks identified in the
period.   
7.4 The Investment Strategy also incorporates investments held by the Common
Good Funds. All such investments during the period were with the Council’s
Loans Fund. The only Council funds held by external fund managers relate to
Council administered Charitable Trusts and are, therefore, not covered by this
Investment Strategy. 
7.5  The budgeted income in 2023/24 for Commercial Property investments is
£1,826,501 whilst the latest projection is £1,821,000. There were no new
property investments entered into during the current period. 
Page 90 of 104

Page 91

8. PRUDENTIAL INDICATORS 
8.1 Prudential Indicators for 2023/24 to 2027/28 were approved by the Council at
its meeting on 10 May 2023 (report 23/135 refers) as part of the Annual
Treasury & Investment Strategy report.  
8.2 The latest estimates of the Prudential Indicators are shown in Appendix IV
and are based on the Council’s revised Capital Budget being considered at
today’s Committee meeting. These show that the Council adhered to all
Prudential Limits in the period. However, the annual Loan Charges relative to
the Net Revenue stream and the Capital Financing (Borrowing) Requirement
show an increasing trend, which reflects the latest estimates for the Capital
Programme and interest rate forecasts over the period. 
9. CONCLUSION 
9.1 The Bank of England’s MPC left Bank Base Rate at 5.25% over the period to
31 March 2024. With inflation continuing to fall it is expected that the MPC will
reduce the Base rate in the coming months. 
9.2 Public Works Loans Board (PWLB) borrowing rates continued to be volatile
over the period due to inflationary expectations and economic growth
prospects, however the rates did decrease in all durations. There were two
new PWLB fixed maturity loans borrowed in the period totalling £30 million. 
9.3 Investment activity in the period consisted of an increased level of fixed term
deposits but for shorter durations, whilst instant access and Money Market
Funds were used to meet day-to-day cashflow requirement. Investment rates
increased over the period, however, the total level of investments outstanding
reduced. 
9.4 The Council adhered to its Investment Strategy and policies throughout the
period, with no breaches in compliance. The Council’s Prudential Indicators
were also adhered to throughout the period. 
Author(s)
Name  Designation Contact Details
John Jennings Senior Accountant CHXFinance@pkc.gov.uk 
Approved 
Name Designation Date
Scott Walker  Chief Finance Officer &
Strategic Lead – Finance
& Business Support
4 April 2024 
Page 91 of 104

Page 92

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling Poverty 
• Tackling climate change and supporting sustainable places 
• Growing a sustainable and inclusive local economy 
• Enabling our children and young people to achieve their full potential 
• Protecting and caring for our most vulnerable people   
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all of these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.  
Page 92 of 104

Page 93

Workforce 
2.2 There are no direct workforce implications arising from this report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
4.1 The Chief Executive and the Council’s Treasury advisors, Link Asset
Services, have been consulted in the preparation of this report.   
Page 93 of 104

Page 94

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix I – PWLB Fixed Maturity Interest Rates from 1 October 2023 to
31 March 2024.
Appendix II – Summary of the Treasury Position and Transactions from
1 October 2023 to 31 March 2024.
Appendix III – Approved Investment Counterparty List.
Appendix IV – Monitoring of Prudential Indicators – Period ending 31 March
2024.
Page 94 of 104

Page 95

PW
LB
Fixed Maturity Interest Rates
From
1st October 2023 to 31st March 2024
(Certainty Rate)
APPENDIX 
I
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
01-Oct-23
08-Oct-23
15-Oct-23
22-Oct-23
29-Oct-23
05-Nov-23
12-Nov-23
19-Nov-23
26-Nov-23
03-Dec-23
10-Dec-23
17-Dec-23
24-Dec-23
31-Dec-23
07-Jan-24
14-Jan-24
21-Jan-24
28-Jan-24
04-Feb-24
11-Feb-24
18-Feb-24
25-Feb-24
03-Mar-24
10-Mar-24
17-Mar-24
24-Mar-24
31-Mar-24
1 Year
5 Years
10 Years
20 Years
30 Years
50 Years
7
Page 95 of 104

Page 96

Page 96 of 104

Page 97

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 OCTOBER 2023 TO 31 MARCH 2024
APPENDIX II
1 LONG TERM BORROWING
(a) Long Term Borrowing 1 October 2023 to 31 March 2024
Average Average Amount
No. Rate (%) Life (years) (£)
PWLB  - Maturity Loans 2 4.51% 5.7 30,000,000
2 4.51% 5.7 30,000,000
(b) Long Term Debt Repayments 1 October 2023 to 31 March 2024
Average Amount
No. Rate (%) (£)
Scottish Government - Empty Homes Loan 1 0.00% 140,000
0 0.00% 140,000
(c) Long Term Debt Outstanding
Outstanding Average Outstanding Average
30-Sep-23 Rate 31-Mar-24 Rate
£ £
Public Works Loan Board 555,000,000 2.39% 585,000,000 2.50%
Money Market Loans (LOBO's) 43,200,000 4.59% 43,200,000 4.59%
Other Long Term Debt 140,000 0.00% 0 0.00%
TOTAL 598,340,000 2.55% 628,200,000 2.64%
2 SHORT TERM BORROWING
(a) Short Term Market Borrowing - 1 October 2023 to 31 March 2024
Average Average Average Interest
No. Amount (£) Rate (%) Term (Days) (£)
Temporary borrowing 1 10,000,000 5.35% 7 10,260.27
1 10,000,000 5.35% 7 10,260.27
(b) Short Term Borrowing Outstanding
Outstanding Average Outstanding Average
30-Sep-23 Rate 31-Mar-24 Rate
£ £
Market Borrowing 0 0.00% 0 0.00%
Common Good and Charitable Funds 2,293,508 3.95% 2,414,508 4.81%
Local Trusts & Investors 3,129,650 4.69% 2,247,591 4.58%
7
Page 97 of 104

Page 98

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 OCTOBER 2023 TO 31 MARCH 2024
APPENDIX II
TOTAL 5,423,158 4.38% 4,662,099 4.69%
3 INVESTMENTS
(a) Investment Transactions - 1 October 2023 to 31 March 2024
Average Average Average Total
Fixed Deposits & Investments No. Amount (£) Rate (%) Term (Days) Interest (£)
Banks 1 5,000,000 5.38% 56 41,271.23
Foreign Banks and Institutions 1 5,000,000 5.44% 85 63,342.47
Other Local Authorities 10 5,250,000 6.74% 18 174,082.19
12 5,208,333 6.53% 27 278,695.89
Average Average Total
Instant/Notice Accounts & Money Market Funds Amount (£) Rate (%) Interest (£)
Instant Access/Notice accounts 498,335 4.58% 7,426.26
Money Market Funds 9,433,125 5.34% 384,349.84
6,949,447 5.32% 391,776.11
(b) Investments Outstanding Outstanding Average Outstanding Average
30-Sep-23 Rate 31-Mar-24 Rate
£ £
UK Banks 60,107,877 5.59% 25,008,505 5.91%
Foreign Banks and Institutions 43,000,000 5.45% 10,000,000 5.94%
Other Local Authorities 25,000,000 4.54% 29,500,000 7.18%
Money Market Funds 5,025,000 5.35% 1,025,000 5.29%
Page 98 of 104

Page 99

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Fitch Credit CDS Maximum
Country Rating Range Lending Note (2)
Category 1 - Principal UK Clearing Banks  -  40% Investment total (or £20M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Bank of Scotland (RFB) (5) UK A+, F1 In range 6 months £80million Group limit
Barclays Bank plc (NRFB) (5) UK A+, F1 No data 6 months
Barclays Bank plc (RFB) (5) UK A+, F1 In range 6 months
Goldman Sachs International Bank UK A+, F1 In range 6 months
Handelsbanken plc UK AA, F1+ No data 12 months
HSBC Bank plc (NRFB) UK AA-, F1+ In range 12 months
HSBC Bank plc (RFB) UK AA-, F1+ No data 12 months
Lloyds Bank Corporate Markets Plc (NRFB) UK A+, F1 No data 6 months £80million Group limit
Lloyds Banking Group plc (RFB) UK A+, F1 In range 6 months £80million Group limit
NatWest Markets Plc (NRFB) UK A+, F1 In range 12 months
Royal Bank of Scotland plc (RFB) (inc Nat West) (3) (4) UK A+, F1 Nationalised 12 months Sovereign Rating AA
Santander UK plc (inc Cater Allen) UK A+, F1 No data 12 months
Standard Chartered Bank UK A+, F1 In range 6 months
Sumitomo Mitsui Banking Corporation Europe Ltd UK A, F1 In range 6 months
Category 2 - Foreign Banks & Institutions -  25% Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Australia and New Zealand (ANZ) Banking Group Ltd Aus A+, F1+ In range 12 months
Commonwealth Bank of Australia Aus A+, F1+ In range 12 months
Macquarie Bank Ltd Aus A, F1 No data 12 months
National Australia Bank Ltd Aus A+, F1+ In range 12 months
Westpac Banking Corporation Aus A+, F1+ In range 12 months
BNP Paribas Fortis Bank Belgium A+, F1 No data 1 month Sovereign Rating AA-
KBC Bank Belgium A+, F1 No data 1 month Sovereign Rating AA-
Bank of Montreal Can AA-, F1+ No data 12 months
Bank of Nova Scotia Can AA-, F1+ No data 12 months
Canadian Imperial Bank of Commerce Can AA-, F1+ No data 12 months
National Bank of Canada Can A+, F1 No data 6 months
Royal Bank of Canada Can AA, F1+ No data 12 months
Toronto Dominion Bank Can AA-, F1+ No data 12 months
Danske Bank Denmark A, F1 In range 6 months
Nordea Bank Finland plc Finland AA-, F1+ No data 1 month Sovereign Rating AA+
BNP Paribas France A+, F1 In range 1 month Sovereign Rating AA
Credit Agricole Corporate and Investment Bank France A+, F1 In range 1 month Sovereign Rating AA
Credit Agricole SA France A+, F1 In range 1 month Sovereign Rating AA
Credit Industriel et Commercial France A+, F1 No data 1 month Sovereign Rating AA
DZ Bank AG Germany AA-, F1+ No data 12 months
Landesbank Hessen-Thueringen Girozentral (Helaba) Germany A+, F1+ In range 12 months
Landwirtschaftliche Rentenbank Germany AAA, F1+ No data 24 months
NRW Bank Germany AAA, F1+ No data 24 months
ABN AMRO Bank Netherlands A, F1 No data 6 months
Bank Nederlandse Germeenten Netherlands AAA, F1+ No data 24 months
Cooperatieve Rabobank Netherlands A+, F1+ In range 12 Months
ING Bank Netherlands AA-, F1+ In range 12 Months
DBS Bank Limited Singapore AA-, F1+ No data 12 months
United Overseas Bank Ltd Singapore AA-, F1+ No data 12 months
Skandinaviska Enskilda Banken AB Sweden AA-, F1+ No data 12 months
Svenska Handelsbanken AB Sweden AA, F1+ No data 12 months
Swedbank AB Sweden A+, F1 No data 12 months
UBS AG Switzerland AA-, F1+ In range 12 months
Bank of America, NA USA AA-, F1+ No data 12 months
Bank of New York Mellon USA AA, F1+ No data 24 months
Citibank, NA USA A+, F1 In range 12 months
JP Morgan Chase Bank, NA USA AA, F1+ No data 12 months
Wells Fargo Bank, NA USA AA-, F1+ In range 12 months
7
Page 99 of 104

Page 100

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Category 3 - Subsidiary Banks & Building Societies - 15% of Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
(parent bank shown in brackets)
Subsidiary Banks
None
Building Societies
Nationwide Building Society UK A, F1 No data 6 months
Category 4 - Other Local Authorities - 20% of Investment total (or £20M per Counterparty if higher)
As arranged
Category 5 Money Market Funds - 10% of Investment Total (or £10M per Counterparty if higher)
(Minimum rating required Fitch AAA)
Aberdeen Standard Investments UK AAA
Aviva Investors Liquidity Fund UK AAA
Federated Sterling Liquidity Fund (Class 3) UK AAA
Insight Sterling Liquidity Fund (Class 5) UK AAA
Deutsche Bank Sterling Fund UK AAA
Note:
(1) - Standard & Poor's credit ratings shown, as no Fitch credit rating available
(2) - All Soveriegn credit ratings for above Countries are AAA, unless stated otherwise.
(3) - Banks are part/majority owned by the UK government
(4) - UK Sovereign Rating is AA (Fitch and Standard & Poor's)
Last Updated: 04-Apr-24(5) -  NRFB = Non Ring Fenced Bank,  RFB = Ring Fenced Ban
Page 100 of 104

Page 101

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 31 MARCH 2024
APPENDIX IV
1 Financing Costs:Net Revenue Stream
The ratio of Capital Financing Costs (Loan Charges) to the Council's net revenue stream shall not exceed the following limits, which are based on historic levels, and allow some
headroom for movement in interest rates. The estimated Financing Costs below are based on the latest monitoring figures.
2023/24 2024/25 2025/26 2026/27 2027/28
Prudential Limit - General Fund 15.00% 15.00% 15.00% 15.00% 15.00%
Estimated Ratio of Financing Costs to Revenue 6.49% 7.40% 8.90% 9.13% 9.29%
Prudential Limit - HRA 30.00% 30.00% 30.00% 30.00% 30.00%
Estimated Ratio of Financing Costs to Revenue 21.93% 20.94% 23.11% 23.22% 24.57%
2 Gross & Net Borrowing and Capital Financing Requirements
For prudence, net external borrowing must not exceed the total capital financing requirement, thus ensuring that over the medium term, borrowing is only undertaken for capital
purposes. The estimated total net borrowing and Capital Financing Requirement at the end of each of the years are as follows:
Actual as at Projected Projected Projected Projected
31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27 31-Mar-28
Net External Borrowing* 682,369,000 899,737,000 999,620,000 1,089,403,000 1,159,285,000
Gross External Borrowing* 747,902,000 939,737,000 1,024,620,000 1,114,403,000 1,184,285,000
Capital Financing Requirement 791,035,000 959,316,000 1,044,110,000 1,134,132,000 1,204,043,000
*For the purpose of this indicator, Borrowing includes the outstanding liability under PPP/PFI contracts.
3 Estimates of Gross Capital Expenditure
The total estimated Capital Expenditure contained within the Council's Budgets for each year is as follows, based on updated monitoring figures.
Composite Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current estimate 160,138,000 232,568,000 115,913,000 103,406,000 76,914,000
Original Budget Estimate (including Budget Motion) 194,880,000 184,661,000 113,465,000 69,816,000 48,219,000
Movement in Estimated Capital Expenditure (34,742,000) 47,907,000 2,448,000 33,590,000 28,695,000
The Original Budget Estimates are those per the 2023/24 to 2027/28 Composite Capital Budget Report on 1 March 2023
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 24 April 2024.
HRA Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current estimate 19,249,000 21,536,000 19,942,000 15,633,000 19,845,000
Original Budget Estimate 18,457,000 13,858,000 18,669,000 19,044,000 19,044,000
Movement in Estimated Capital Expenditure 792,000 7,678,000 1,273,000 (3,411,000) 801,000
The Original Budget Estimates are those per the 2023/24 to 2027/28 Housing & Social Wellbeing Budget Report on 25 January 2023.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 24 April 2024.
7
Page 101 of 104

Page 102

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 31 MARCH 2024
APPENDIX IV
4 Estimate of Capital Financing Requirement
The estimate (as at April 2024) of the Capital Financing Requirement (ie new borrowing requirement for Capital Expenditure) for each year based on these plans is as follows:
Composite Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current Estimated Capital Financing Requirement 109,837,000 199,423,000 97,024,000 76,816,000 52,721,000
Original Budget Estimate (including Budget Motion) 146,850,000 164,688,000 95,082,000 49,184,000 24,991,000
Movement in Estimated Capital Financing Requirement (37,013,000) 34,735,000 1,942,000 27,632,000 27,730,000
The Original Budget Estimates are those per the 2023/24 to 2027/28 Composite Capital Budget Report on 1 March 2023
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 24 April 2024.
HRA Programme 2023/24 2024/25 2025/26 2026/27 2027/28
Current Estimated Capital Financing Requirement 17,183,000 19,703,000 17,864,000 13,629,000 17,720,000
Original Budget Estimate 16,402,000 11,940,000 16,421,000 16,524,000 16,292,000
Movement in Estimated Capital Financing Requirement 781,000 7,763,000 1,443,000 (2,895,000) 1,428,000
The Original Budget Estimates are those per the 2023/24 to 2027/28 Housing & Social Wellbeing Budget Report on 25 January 2023.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 24 April 2024.
5 External Debt (Gross and Net)
As at Projected Projected Projected Projected
External Borrowing 31-Mar-24 31-Mar-25 31-Mar-26 31-Mar-27 31-Mar-28
Public Works Loan Board 585,000,000 782,000,000 872,000,000 967,000,000 1,042,000,000
Market Bonds (LOBOs) 43,200,000 43,200,000 43,200,000 43,200,000 43,200,000
Project Borrowing 0 0 0 0 0
Special Loans 2,414,508 2,414,508 2,414,508 2,414,508 2,414,508
Temporary Loans/Other Borrowing 2,247,591 2,000,000 1,800,000 1,500,000 1,300,000
Other Long Term Liabilities (PPP/PFI) 115,039,977 110,122,727 105,205,477 100,288,227 95,370,977
Total Gross External Debt 747,902,076 939,737,235 1,024,619,985 1,114,402,735 1,184,285,485
Short Term Investments (65,533,505) (40,000,000) (25,000,000) (25,000,000) (25,000,000)
Long Term Investments 0 0 0 0 0
Total Net External Debt 682,368,571 899,737,235 999,619,985 1,089,402,735 1,159,285,485
Note:
Operational Boundary 748,000,000 940,000,000 1,025,000,000 1,115,000,000 1,185,000,000
Authorised Limit 1,200,000,000 1,280,000,000 1,280,000,000 1,280,000,000 1,280,000,000
The Operational Boundary and Authorised Limit are based on Gross External Debt.
Page 102 of 104

Page 103

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 31 MARCH 2024
APPENDIX IV
6 Principal Sums Invested Longer Than 365 Days
The Upper Limit for sums invested for over 1 year up to 3 years is £45 million. There were no amounts invested within this period as at 31 March 2024.
7 MATURITY STRUCTURE
The lower and upper limit for the proportion of the Council's total-long term debt which matures in each of  the time bandings below, and is therefore subject to refinancing at the
prevailing market rates, is as follows:
Borrowing Maturity Structure Lower Limit Upper Limit Estimated
Under 12 months 0% 35% 2.41%
over 12 months and < 24 months 0% 35% 1.33%
over 2 years and < 5 years 0% 50% 7.73%
over 5 years and < 10 years 0% 75% 6.38%
over 10 years 10% 95% 82.14%
The maurity profile for the Council's current long-term portfolio as at 31st March 2024, measured from the start of the financial year, is as follows:
Less 1 Year 1 - 2 Years 2 - 5 Years 5 - 10 Years 10 - 20 Years 20 - 30 Years 30 - 40 Years 40 - 50 Years Over 50 Years Total
PWLB 13,000,000 5,000,000 42,500,000 20,000,000 5,000,000 0 60,500,000 439,000,000 0 585,000,000
LOBOs 0 0 0 0 0 13,000,000 25,200,000 5,000,000 0 43,200,000
Other 0 0 0 0 0 0 0 0 0 0
PPP/PFI 4,917,250 4,917,250 14,948,700 27,426,400 62,830,377 0 0 0 0 115,039,977
Total 17,917,250 9,917,250 57,448,700 47,426,400 67,830,377 13,000,000 85,700,000 444,000,000 0 743,239,977
Percentage 2.41% 1.33% 7.73% 6.38% 9.13% 1.75% 11.53% 59.74% 0.00% 100.00%
Page 103 of 104

Page 104

Page 104 of 104