Democracy Spraffa

Revenue Budget 2023/24 - Update No. 4

Perth and Kinross Council · 24 April 2024
Back to Finance and Resources Committee — 24 April 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PERTH & KINROSS COUNCIL 
FINANCE & RESOURCES COMMITTEE 
24 APRIL 2024 
REVENUE BUDGET 2023/24 – UPDATE NO. 4 
Contact Officer: Scott Walker, Strategic Lead – Finance & Business Support
(Report No. 24/130) 
1. PURPOSE 
1.1 This report provides an update on progress with the 2023/24 General Fund
Revenue Budget based upon the January 2024 ledger, updated for any
subsequent known material movements, and the projected financial position
of the Housing Revenue Account. 
1.2 The total net projected under spend on the 2023/24 General Fund
Management Budget is £1.373 million (see Appendix 1). 
1.3 The report also seeks approval for several adjustments to the 2024/25
Revenue Budget approved by Council on 28 February 2024. 
2. RECOMMENDATIONS 
The Committee is requested to: 
A. note the contents of the report. 
B. note the projected outturn for General Fund Services set out in Section
5 and Appendix 1 and 2. 
C. note the projected outturn for Corporate Budgets and Perth & Kinross
Integration Joint Board set out in Section 6. 
D. note the funding update provided in Section 7. 
E. note the projected outturn for the Housing Revenue Account, which is
summarised in Section 8 and Appendix 4. 
F. approve the adjustments to the 2023/24 Management Revenue Budget
detailed in Sections 8, 9, 10 & 11 and Appendices 1, 2, 4, 5, 6 & 7. 
G. note the financial risks set out in Section 12 and Appendix 8. 
H. approve the adjustments to the 2024/25 Management Revenue Budget
detailed in Section 13 and Appendix 9.

Page 2

3. STRUCTURE 
Section 4 Background
Section 5 Revenue Monitoring – Service Budgets
Section 6 Revenue Monitoring – Corporate Budgets
Section 7 Revenue Monitoring – Funding
Section 8 Revenue Monitoring – Other Updates
Section 9 2023/24 Additional Funding
Section 10 2023/24 Virements
Section 11 2023/24 Movements in Reserves
Section 12 Financial Risks
Section 13 Adjustments to 2024/25 Revenue Budget
Section 14 Conclusions 
4. BACKGROUND 
4.1 This report updates the Committee on progress with the 2023/24 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the January 2024 ledger,
updated for any subsequent known material movements. 
4.2 The budget total reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the 2023/24 Final Revenue Budget on
1 March 2023 (Report No. 23/72 refers).  In addition, adjustments approved
by the Council on 4 October 2023 (Report No. 26/268 refers), the Finance &
Resources Committee on 26 April, 13 September and 22 November 2023 and
31 January 2024 (Report Nos. 23/120, 23/242, 23/315 and 24/40 refer) and
Executive Sub-Committee of the Finance & Resources Committee on 24 July
2023 (Report No. 23/219 refers) are reflected in Appendix 1 (Column 2). 
5. REVENUE MONITORING – SERVICE BUDGETS 
5.1 The Service Budget projections included within this section and Appendix 1
through to 8 have been prepared based on the Council’s previous structure. 
Going forward, future reports will reflect the new structure. 
5.2 The total net projected under spend on Service budgets, which is summarised
in Section 1 of Appendix 1 to this report, is £2.543 million which represents
0.7% of total net Service expenditure. 
5.3 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below. 
5.4 The management of Service over and under spends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years. 
5.5 All Council Services are over achieving on approved levels of slippage. 
Whilst there is a financial impact of this which is reflected in the projected
outturns included in this report, there may be unintended consequences in

Page 3

terms of performance, delivery of strategic objectives and impact on the
remaining workforce. 
5.6 There also remains a risk that the Council continues to experience increases
in costs over the short to medium term that are higher than budgeted inflation
levels.  This is already being seen in the cost of the materials required by
property and housing maintenance teams.  Going forward, this may continue
to have an impact on projected outturns and future years’ budgets. 
Education & Children’s Services 
5.7 The projected outturn for Education & Children’s Services excluding Devolved
School Management (DSM) and the Pupil Equity Fund (PEF) is currently
anticipated to be £2.761 million or 1.1% less than budget – a movement of
£1.725 million on the position last reported to Committee.  The individual
elements contributing to this position are summarised in the following table
and narrative. 
Function Projected Outturn Movement 
£’m % £’m
Education Services Under spend (1.008) (1.7) (0.604)
Children, Young People & Families Under spend (0.337) (1.4) (0.236)
Business & Resource Services Under spend (0.205) (2.8) (0.130)
Catering Services Under spend (1.211) (16.8) (0.755)
TOTAL Under spend (2.761) (1.1) (1.725) 
5.8 Within non devolved Education Services there is an increase in the net
projected under spend of £604,000.  This is primarily made up of movements
in projected staff costs due to additional slippage (£565,000).  Other projected
net under spends (£39,000) include the impact of non-domestic rates
revaluations. 
5.9 In Services for Children, Young People & Families there is an increase in
the projected under spend of £236,000.  This is made up of increases in
projected under spends on staff costs (£146,000) and non-staff related
budgets (£90,000). 
5.10 In Business & Resource Services there is an increase in the projected
under spend of £130,000 due, primarily to updated staff cost and income
projections. 
5.11 In Catering Services, there is an increase in the net projected under spend of
£755,000.  This updated projection is based upon the latest information
provided by Tayside Contracts and on further increases in school meal
uptake. 
5.12 The updated projected under spend on Catering Services is based on the
increased budget, which includes the additional contribution from Reserves of
£2.1 million approved by the Finance & Resources Committee on
22 November 2023 (Report No. 23/315 refers).

Page 4

5.13 The Devolved School Management Scheme (DSM) is currently projected to
under spend by £349,000 due to staff slippage and additional income, which
represents 0.3% of the overall DSM budget.  However, individual schools are
experiencing challenges in delivering approved staff slippage targets.  The
budgets for the Devolved School Management scheme are allocated by
financial year (April – March), whereas expenditure is incurred by academic
year (August – June). 
5.14 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than the allocation from the
Scottish Government of £1.874 million.  Schools are being instructed to use
this year’s PEF by 31 March 2024.  It is anticipated that the projected under
spend on teacher and support costs of £100,000 will be carried forward to
2024/25 to meet commitments.  The budgets for the Pupil Equity Fund
scheme are allocated by financial year, whereas expenditure is incurred by
academic year. 
Communities 
5.15 The projected outturn for Communities is currently anticipated to be £373,000
or 0.5% more than budget - which represents a movement of £250,000 on the
position last reported to Committee.  This position is summarised in the
following table and narrative. 
Function Projected Outturn Movement 
£’m % £’m
Environmental & Consumer Services Over spend 1.143 3.0 0.205
Culture & Communities Over spend 0.115 0.9 -
Planning & Development Over spend 0.170 2.6 0.125
Housing Over spend 0.050 0.6 0.005
Business & Resources Under spend (1.105) (18.3) (0.585)
TOTAL Over spend 0.373 0.5 0.250 
5.16 In Environmental & Consumer Services there is an increase in the
projected net over spend of £205,000.  This is due to projected over spends in
Roads on winter maintenance and flooding and Operations on additional hires
and supplies & services, partially offset by additional income. 
5.17 The projected outturn for Environmental & Consumer Services now includes
updated information on the financial consequences of the severe weather of
October 2023.  The gross cost has increased £2.213 million, and it is
anticipated that £1.415 million will be recovered from the Scottish
Government through the Bellwin Scheme with the balance of £798,000 being
funded from unearmarked Reserves. 
5.18 In Planning & Development there is a net increase in the projected over
spend of £125,000 due, in the main, to updated projections in relation to Perth
Harbour and events income. 
5.19 Within Housing there is a net increase in the projected over spend of £5,000.

Page 5

5.20 Within Business & Resources there is a net increase in the projected under
spend of £585,000.  This is a combination of additional staff slippage and
income partially offset by an increase in non-staff cost budgets. 
Corporate & Democratic Services 
5.21 The projected outturn for Corporate & Democratic Services is currently
anticipated to be £228,000 or 0.6% less than budget – a movement of
£288,000 from the position last reported to Committee.  The main movements
are summarised in the following table and narrative. 
Function Projected Outturn Movement 
£’000 % £’000
Legal & Governance Services Under spend (71) (1.6) 47
Finance Over spend 118 8.9 41
Human Resources Under spend (177) (5.3) (109)
IT & Revenues and Benefits Over spend 260 2.7 91
Property Under spend (358) (1.7) (358)
TOTAL Under spend (228) (0.6) (288) 
5.22 Within Legal & Governance, Finance and Human Resources and IT &
Revenues and Benefits there has been a reduction in the net under spend of
£70,000.  This is made up of increase demand for community / crisis grants
partially offset by a combination of updated staff cost projections and income
assumptions as well as a reduction in non-staff related expenditure across the
Service. 
5.23 In Property there has been an increase in the net projected under spend of
£358,000.  This is a combination of additional fee income and reduced
expenditure on maintenance and energy. 
Chief Executive Service 
5.24 The projected outturn for the Chief Executive’s Service is currently anticipated
to be £73,000 more than budget.  These projections include one-off costs of
change associated with the Council’s new leadership structure. 
6. REVENUE MONITORING – CORPORATE BUDGETS 
6.1 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings are set out below. 
Perth & Kinross Integration Joint Board 
6.2 In setting the 2023/24 final Revenue Budget, Perth & Kinross Integration Joint
Board approved the use of Reserves to deliver a balanced position.  However,
the financial position of the IJB remains challenging due to health and social
care continuing to face recruitment challenges, increasing client needs,
uncertainty over funding and rising costs particularly within prescribing.

Page 6

6.3 On 11 March 2024, the Audit & Performance Committee of the Perth &
Kinross Integration Joint Board received a financial update for the Health &
Social Care Partnership.  At that time there was a projected over spend of
£660,000 which is set out in Appendix 3.  Within the overall projected over
spend, £447,000 relates to social care. 
6.4 In relation to non-devolved functions there is currently a projected under
spend of £330,000 which is reflected in Appendix 1.   
Council Tax Reduction Scheme 
6.5 The application of the Council Tax Reduction Scheme is a statutory function
for the Council.  The promotion and encouragement of take up is a key
responsibility for the Council, particularly when households are facing
significant pressures on the cost of living. 
6.6 The level of expenditure incurred by the Council is dependent upon two main
drivers, firstly, the average number of weekly caseload and, secondly, the
average value of weekly entitlements.  The following graph sets out both
variables over the current and previous six financial years.  The graph shows
a clear increase in the average weekly entitlement whereas the average
caseload has been more volatile but has returned to higher levels. 
6.7 In the current financial year, the Council is supporting approximately 8,500
households across Perth and Kinross with the Council Tax Reduction Scheme
with an average award of £16.65 per week.  This results in a projected over
spend on the Council Tax Reduction Scheme of approximately £1.150 million
which is reflected in Appendix 1.

Page 7

7. REVENUE MONITORING – FUNDING 
7.1 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below. 
Council Tax Income 
7.2 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly collection levels and secondly, the
number of Band D properties on the Valuation Roll. 
7.3 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 March 2024 together
with prior year comparative figures for the previous five financial years. 
7.4 Between 2018/19 and 2022/23, the average collection figure to 31 March was
97.05%.  The actual collection figure to 31 March 2024 was 97.53% which is
an improvement of 0.48% compared to the five-year average, but a 0.42%
reduction on the comparable position in 2023.

Page 8

7.5 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions. 
7.6 Using the information on both in year and previous years collection rates,
along with the growth in the number of band D equivalent properties, the level
of Council Tax income is now projected to be £200,000 more than budget and
this is reflected in Appendix 1. 
Non-Domestic Rates 
7.7 The actual collection rate to 31 March 2024 was 96.46%, compared to
97.91% for the same period in 2022/23.

Page 9

8. REVENUE MONITORING – OTHER UPDATES 
Impact on Arm’s Length External Organisations (ALEOs) 
8.1 The Council continues to work closely with its three Arm’s Length External
Organisations (ALEOs) – Live Active Leisure (LAL), Perth Theatre & Concert
Hall (PTCH) and Culture Perth & Kinross (CPK) who make an important
contribution to the Corporate Plan through the current Culture, Physical
Activity and Sport Strategies approved by Council in May 2023. 
8.2 To date, no significant financial issues have been identified relating to Culture
Perth and Kinross or Perth Theatre & Concert Hall. 
8.3 Live Active Leisure finished 2022/23 with a revenue deficit of £203,000. For
2023/24, LAL initially budgeted for a deficit of £630,000.  The latest
projections, which have been considered by their own, Finance and
Governance Committee indicate a deficit of approximately £334,000.  For
2023/24, LAL are funding the budgeted deficit from their Reserves. 
8.4 LAL’s projected deficits in 2021/22 and 2022/23 did not materialise, which is
positive. However, Council officers will work with LAL throughout the year on
best/worst/mid-range projections to ensure that the Committee has more
certainty about the likely year end position for 2023/24. This will be particularly
important to support work on the ALEO budget positions and SLA awards for
2024/25 given the continuing financial challenges which face the Council. 
Housing Revenue Account 
8.5 The Housing Revenue Account is currently projected to break even in the
current financial year.  The main elements are summarised below and set out
in Appendix 4. 
8.6 Across the Housing Revenue Account there is an increase in the net
projected under spend of £170,000.  The main reasons for this movement are
updated bad debt provisions and staff cost projections, partially offset by
reduced income. 
8.7 As a result of the variances identified above Capital Financed from Current
Revenue will reduce by £280,000. 
9. 2023/24 ADDITIONAL FUNDING 
9.1 Since the 2023/24 Revenue Budget was updated on 31 January 2024 (Report
No. 24/40 refers), the Council has been advised of additional funding for the
current financial year from several sources.  To ensure that the 2023/24
Management Budget continues to reflect the operational requirements of the
Council, several adjustments are required, which are summarised below and
included in Appendix 1 and Appendix 5.

Page 10

Scottish Government – Revenue Support Grant: 
• Support for School Staff Training – £23,000 (Education & Children’s
Services) (ECS) 
• Summer programmes - £2,000 (ECS)
• Storm Babet - £88,000 (Communities) 
• Pay Uplifts - £1.411 million (Reserves) 
• Self-Directed Support Transformational Funding - £6,000 (Health &
Social Care) 
9.2 The Scottish Government has advised that the increase in funding identified
above of £1.530 million will be made through a redetermination of the
Council’s Revenue Support Grant.  It is therefore necessary to adjust budgets
for Education & Children’s Services, Communities, Health & Social Care and
Revenue Support Grant. 
9.3 ACTION: The Committee is asked to approve the adjustments set out at
paragraph 9.1 which is reflected in Appendix 1 (Column 3) to this report. 
Other Funding 
9.4 Other funding amounting to £1.071 million will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.   Details of this funding is set out in
Appendix 5. 
9.5 ACTION: The Committee is asked to note the receipt of £1.071 million of
additional resources, with this funding being reflected within Education &
Children’s Services and Communities as additional grant income.  The current
projected outturn assumes that all these additional resources will be fully
expended in 2023/24 or carried forward under the terms of the grant award. 
10. 2023/24 VIREMENTS 
Contribution to/from Capital Fund 
10.1 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or under spend on
Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.   
10.2 The latest monitoring indicates a projected reduction in capital financing costs
(loan charges) of £545,000 based on capital expenditure and the latest
treasury management activity and a reduction in income of £534,000 from
interest on revenue balances due to updated interest rate projections.  This
will result in a net increase in the Contribution to the Capital Fund of £11,000
in the current financial year. 
10.3 ACTION: The Committee is requested to approve the virement of £545,000
from the Capital Financing Costs (Loan Charges) Budget and £534,000 from
Interest on Revenue Balances with a corresponding increase in the projected

Page 11

Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 4) to this report. 
10.4 At 31 March 2023, the audited 2022/23 Annual Accounts included a Capital
Fund balance of £26.343 million.  Following the Council approval of a 1%
increase in Council Tax to be applied to the Loan Charges budget each year
from 2025/26, with the existing approved Capital Budget, the Capital Fund is
currently projected to peak in 2050/51, before gradually reducing until fully
utilised in 2062/63. 
11. 2023/24 MOVEMENTS IN RESERVES 
11.1 Included at Appendix 6 is an update on the Council’s General Fund
Reserves.  The appendix includes the following: 
• Earmarked and unearmarked Reserves at 31 March 2023 (per audited
Annual Accounts).
• previously approved contributions to and from earmarked Reserves in
2023/24, 2024/25 and 2025/26.
• The impact of proposals within this report on earmarked Reserves.
• Known commitments against earmarked Reserves.
• The impact of the latest revenue monitoring on the level of
unearmarked Reserves. 
11.2 The earmarked Reserves are brigaded under three headings as follows: 
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation and the Council has limited discretion
in how they are applied. 
ii. Balances held for specific (previously approved) purposes – the
purpose of these earmarked Reserves has been previously approved
by Council in either the Reserves Strategy or Annual Accounts 
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals. 
11.3 Proposals involving earmarked Reserves under i. and ii. above will be advised
to Committee in summary as Council either has limited discretion or
previously approved their application.  Proposals to apply earmarked
Reserves under iii. above will include more detail for elected member
consideration. 
Balances Held for Specific (Previously Approved) Purposes 
11.4 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts. 
The proposals listed below transfer funding to earmarked Reserves to be
applied in future years. 
• Climate Change - £110,000

Page 12

• Workforce Management (including Transformation) - £111,000
• School Estate - £805,000 (Perth High School, Learning Estate
Investment Programme & Bertha Park High School) 
11.5 ACTION: the Committee is asked to approve the transfer of £1.026 million to
the earmarked Reserves set out above.  These adjustments are reflected in
Appendix 1 (column 5) to the report. 
11.6 Approval is also sought to draw down £236,000 for the Culture earmarked
Reserve in respect of the Stone of Destiny and opening exhibition costs. 
11.7 ACTION: the Committee is asked to approve the application of £236,000 from
the Culture earmarked Reserve to fund the upfront costs relating to the
opening of the Perth Museum.  The adjustment for 2023/24 is reflected in
Appendix 1. 
11.8 In addition, in setting the 2023/24 Revenue Budget in March 2023 the
Council Approved Expenditure to fund several specific initiatives.  For a
variety of reasons including consultation and capacity issues, there has been
slippage in the delivery of a few of these projects that may result in the
expenditure not being incurred in the current financial year.  Projects totalling
£524,000 are set out at Appendix 7. 
11.9 Should the Committee confirm that that the projects remain a priority for the
Council then the balances set out in Appendix 7 will be transferred to an
earmarked Reserve to ensure that the funding is in place to ensure delivery.
The final outturn for individual projects may change before the end of the
financial year. Therefore, by agreeing the projects within Appendix 7, the
Committee is confirming that the initiative remains a priority and that the final
under spend will be earmarked within Reserves. 
11.10 Should any of the projects no longer be a priority, the projected under spend
would be available to support the financial management of the Council in both
current and future financial years. 
11.11 ACTION: The Committee is asked to confirm that the projects listed in
Appendix 7 remain a priority and that the final under spends, currently
projected at £524,000 are transferred to an earmarked Reserve to ensure
delivery.  These adjustments are reflected in Appendix 1 (column 5) to the
report. 
11.12 Furthermore, under the Framework for Managing Workforce Change, the
authority to approve voluntary severance requests sits with the Executive
Leadership Team, except for requests from Chief Officers.  With that in mind,
approval is sought to draw down £217,000 from the Transformation and
Workforce Management earmarked Reserve to fund voluntary severance
requests.  These voluntary severance requests will support the delivery of
savings previously approved by Council and payback in less than two years.

Page 13

11.13 ACTION: The Committee is asked to approve the transfer of £217,000 from
the Transformation & Earmarked Reserve with adjustments reflected in
Appendix 1 (Column 5) to the report. 
11.14 Subject to approval of the proposals included within this report set out above,
the level of unearmarked Reserves will increase to £17.858 million or 4%. 
Insurance Fund 
11.15 In setting the 2025/26 Provisional Revenue Budget, Council has already
acknowledged the pressure on the Insurance Fund with a recurring
contribution of £800,000 from that year. 
11.16 However, based on the latest information, the level of unearmarked Reserves
is now projected to be more favourable than previously advised.  With this in
mind, and subject to this position crystallising in the 2023/24 Annual
Accounts, approval is sought for a non-recurring contribution of £1 million to
the Insurance Fund to improve the financial position of the Fund. 
11.17 ACTION: The Committee is asked to approve a contribution of £1 million to
the Insurance Fund in 2023/24 with this adjustment being reflected in
Appendix 1 (Column 5) to the report. 
11.18 Subject to approval of all the proposals included within this report and
recognising the known commitments, the level of earmarked Reserves will
reduce to £24.133 million and the level of unearmarked Reserves will be
£16.858 million or 3.7%. 
11.19 The level of unearmarked Reserves at 31 March 2024 may increase on
completion of the unaudited 2023/24 Annual Accounts are completed.  If this
does come to pass, it is proposed that the amount in excess of 4% is
transferred to the earmarked Reserve for Transformation & Workforce
Management.  The Finance & Resources Committee on 18 September 2024
will receive an update on his proposal. 
12. FINANCIAL RISKS 
12.1 In preparing the Council's 2023/24 Revenue Monitoring, officers have
considered the key strategic, operational and financial risks facing the Council
over this period.  Whilst the risks may be managed in the current financial
year, there is the potential for there to be an impact in the future. 
12.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure. 
12.3 Financial risks previously identified are summarised in Appendix 8.

Page 14

13. ADJUSTMENTS TO 2024/25 REVENUE BUDGET 
2024/25 Additional Funding 
13.1 Since the 2024/25 Revenue Budget was approved on 28 February 2024
(Report No. 24/63 refers), the Council has been advised of additional funding
in 2024/25 from the Scottish Government as follows.  To ensure that the
2024/25 Management Budgets continue to reflect the operational
requirements of the Council, several adjustments are required, which are
summarised below and included in Appendix 9. 
Revenue Support Grant 
• Living Wage: £7.014 million (Health & Social Care - £6.764 million,
Housing & Communities - £250,000)
• Discretionary Housing Payment: £958,000 (Customer & Digital)
• Scottish Disability Allowance - £117,000 (Finance & Business Support) 
• Whole Family Wellbeing Fund - £5,000 (Children, Families & Justice) 
Non-Domestic Rates 
• Increase in allocation - £203,000. 
13.2 The Scottish Government has advised that the adjustment in funding
identified at paragraph 13.1 will be made through a redetermination of the
Council’s Revenue Support Grant.  It is therefore necessary to adjust the
budgets for Housing & Communities, Customer & Digital, Finance & Business
Support, Health & Social Care, Revenue Support Grant and Non-Domestic
Rates. 
13.3 ACTION: The Committee is asked to approve the adjustments set out in
paragraphs 13.1 and 13.2.  These adjustments are reflected in Appendix 9
(Column 3) to this report. 
13.4 The Scottish Government has also withheld distribution of £145.5 million
nationally for teachers, which the Council has not adjusted for and amounts to
£3.625 million.  The Council’s 2024/25 Revenue Budget has been
constructed on the basis that this funding is forthcoming during the financial
year.  This funding will no longer be paid through the Revenue Support Grant
mechanism and as such the an other grant income budget has been created
in Economy, Place and Learning. 
2024/25 Service Virements 
13.5 To ensure that the 2024/25 Management Revenue Budget continues to reflect
current Service needs and operational requirements the following virements
between budgets are required. 
• Capital Grant to Communities (£139,000) to reflect a rephasing of
expenditure on Tactran capital projects – this is brought forward from
2023/24.

Page 15

2024/25 Movements in Reserves 
Transformation Projects 
13.6 Due to the rephasing of expenditure, approval is sought to draw down funding
to take forward the following approved projects in 2024/25: 
• Anti-Poverty - £74,000 to Strategic Planning, People & Performance
• Transformation - £702,000 to Strategic Planning, People &
Performance
• Procurement & Commissioning - £142,000 to Legal & Governance
• Finance - £214,000 to Finance & Business Support 
13.7 ACTION: The Committee is asked to approve the transfers from the
Transformation and Workforce Management earmarked Reserve listed in 13.6
above. These adjustments are reflected in Appendix 9 (Column 5) to this
report. 
Council Approved Expenditure 
13.8 Approval is sought to apply funding to the Council approved projects identified
at paragraph 11.9 and Appendix 7 to 2024/25 to ensure that they are
delivered. 
13.9 ACTION: The Committee is asked to approve the adjustments set out at
paragraph 11.9 above and Appendix 7 in 2024/25.  These adjustments are
reflected in Appendix 9 (Column 5) to this report. 
Climate Change 
13.10 Approval is sought to apply the 2023/24 projected under spend of £110,000
on Climate Change identified in paragraph 10.22 to 2024/25. 
13.11 ACTION: The Committee is asked to approve the transfer of £110,000 from
the Climate Change earmarked Reserve to Environment & Infrastructure. 
This adjustment is reflected in Appendix 9 (Column 5) to the report. 
Modern Apprentices 
13.12 Approval is sought to apply £340,000 to support the modern apprentice
programme. 
ACTION: The Committee is asked to approve the transfer of £340,000 from
the Modern Apprentices earmarked Reserve to Strategic Planning, People
and Resources.  This adjustment is reflected in Appendix 9 (Column 5) to the
report. 
Working Smarter 
3.13 Approval is sought to apply £115,000 on the working smarter project
previously reported as requiring to be carried forward.

Page 16

ACTION: The Committee is asked to approve the transfer of £115,000 from
the working smarter earmarked Reserve to Property Services. This
adjustment is reflected in Appendix 9 (Column 5) to the report. 
14. CONCLUSION 
14.1 Based on the October January 2024 ledger, a projected under spend of
£1.428 million has been identified in the current financial year. 
14.2 This level of projected over spend and contributions from unearmarked
Reserves included within this and previous reports will result in a reduction in
the level of unearmarked Reserves to £16.858 million or 3.7%. 
14.3 The financial position of the Council and its partners and ALEOs remains
challenging and regular updates will be provided to the Council and the
Finance & Resources Committee as the position develops. 
APPROVED 
Name  Designation Date
Clare Mailer  Director – Strategy, People &
Resources
28 March 2024

Page 17

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce Yes
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  Yes
External  None
Communication 
Communications Plan  None 
1. Strategic Implications 
Corporate Plan 
1.1 The Council’s Corporate Plan 2022 – 2027 lays out seven outcome focussed
strategic objectives which provide clear strategic direction, inform decisions at
a corporate and service level and shape resources allocation.  They are as
follows: 
• Tackling poverty
• Tackling climate change and supporting sustainable places
• Growing a sustainable and inclusive local economy
• Enabling our children and young people to achieve their full potential
• Protecting and caring for our most vulnerable people
• Supporting and promoting physical and mental wellbeing
• Placing communities at the heart of how we work 
1.2 This report relates to all these objectives. 
2. Resource Implications 
Financial 
2.1 There are no direct financial implications arising from this report other than
those reported within the body of the main report.

Page 18

Workforce 
2.2 There are no direct workforce implications arising from this report other than
those reported within the body of the main report. 
Asset Management (land, property, IT)   
2.3 There are no direct asset management implications arising from this report
other than those reported within the body of the main report. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.   
3.6 The information contained within this report has been considered under the
Act.  However, no action is required as the Act does not apply to the matters
presented in this report.   
4. Consultation 
Internal 
4.1 The Executive Leadership Team have been consulted in the preparation of
this report.

Page 19

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to any material extent in preparing the above
report. 
3. APPENDICES 
Appendix 1 – 2023/24 Management Budget
Appendix 2 – General Fund 2023/24 Projected Outturn – Service Analysis
Appendix 3 – Health & Social Care Partnership
Appendix 4 – Housing Revenue Account 2023/24 Projected Outturn
Appendix 5 – Other Fundings
Appendix 6 – General Fund Balances
Appendix 7 – Council Approved Expenditure
Appendix 8 – Financial Risks
Appendix 9 – 2024/25 Management Budget