Agenda Document Pack - Finance and Resources Committee - 22/04/2026

Perth and Kinross Council · 22 April 2026
Back to Finance and Resources Committee — 22 April 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
15/04/2026 
A hybrid meeting of the Finance and Resources Committee will be held in the
Council Chamber on Wednesday, 22 April 2026 at 13:00. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Stewart Donaldson (Convener)
Councillor Eric Drysdale (Vice-Convener)
Bailie Chris Ahern
Councillor Keith Allan
Councillor Dave Cuthbert
Councillor John Duff
Councillor David Illingworth
Councillor Ian Massie
Provost Xander McDade
Councillor Tom McEwan
Bailie Claire McLaren
Depute Provost Andrew Parrott
Councillor John Rebbeck
Councillor Caroline Shiers
Councillor Colin Stewart
Councillor Alan Watt
Page 1 of 186

Page 2

Page 2 of 186

Page 3

Finance and Resources Committee 
Wednesday, 22 April 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES 
2 DECLARATIONS OF INTEREST 
3 MINUTES 
3(i)  MINUTE OF  MEETING OF THE FINANCE AND RESOURCES
COMMITTEE OF 4 FEBRUARY 2026 FOR APPROVAL
(copy herewith) 
5 - 6 
3(ii)  MINUTE OF MEETING OF THE EMPLOYEES JOINT
CONSULTATIVE COMMITTEE OF 3 DECEMBER 2025 FOR
NOTING
(copy herewith) 
7 - 12 
4 MOTION - MEMORIAL SAFETY IN COUNCIL CEMETERIES
(copy herewith) 
13 - 14 
5 OUTSTANDING BUSINESS STATEMENT
(copy herewith 26/109) 
15 - 16 
6 2025/26 REVENUE BUDGET - UPDATE NO. 4
Report by Chief Finance Officer (copy herewith 26/110) 
17 - 54 
7 COMPOSITE CAPITAL BUDGET 2025/31 AND HOUSING
INVESTMENT PROGRAMME 2025/30 – MONITORING REPORT
NO.4
Report by Chief Finance Officer (copy herewith 26/111) 
55 - 88 
8 TREASURY ACTIVITY AND COMPLIANCE REPORT 2025/26 - 6
MONTHS TO 31 MARCH 2026
Report by Chief Financial Officer (copy herewith 26/112) 
89 - 106 
9 TRANSFORMATION & CHANGE PROGRAMME UPDATE
Report by Chief Executive (copy herewith 26/113) 
107 - 186 
Page 3 of 186

Page 4

Page 4 of 186

Page 5

DRAFT
Finance and Resources Committee
Minute of hybrid meeting of the Finance and Resources Committee held in the Council
Chamber, 2 Hight Street, Perth on Wednesday 26 November 2025 at 1.30pm.
Present: Councillors S Donaldson and E Drysdale, Bailie C Ahern, K Allan, J Duff,
D Illingworth, G Laing (substituting for Councillor D Cuthbert), I Massie, Provost
X McDade, T McEwan, Bailie C McLaren, Depute Provost A Parrott, J Rebbeck,
C Shiers, C Stewart and A Watt.
In Attendance: T Glen, Chief Executive; C Mailer, Dute Chief Executive; S Walker,
Strategic Lead - Finance and Business Support; A O’Brien, S Coyle, C France,
J Jennings, C Palmer, C Robertson and J Salisbury (Finance and Business Support);
J Beveridge, Strategic Lead – Property Services; N Lennon (Property Services);
D Macluskey, Strategic Lead – Education and Learning; A Singh, Strategic Lead -
Children, Families and Justice; E Ritchie, Strategic Lead - Housing and Communities;
A Clegg, D Stokoe, A McCallum, M Smith and G Stewart (Housing and Communities);
F Crofts, Strategic Lead - Environment and Infrastructure; D Davidson and P Leonard
(Environment and Infrastructure); G Boland, Strategic Lead - Strategic Planning, People
and Resources; K Fraser, N Sutherland, P Taylor and S Watt (Customer and Digital
Services); S Hendry, G Fogg, K Molley, A Brown and M Pasternak (all Legal and
Governance).
Apology: Councillor D Cuthbert.
Councillor S Donaldson, Convener, Presiding.
1. Welcome and Apologies
The Convener welcomed all those present to the meeting and apologies were
noted as above.
2. Declarations of Interest
There were no declarations made in terms of the Councillors’ Code of Conduct.
3. Minutes
(i) Finance and Resources Committee - 26 November 2025
The minute of meeting of the Finance and Resources Committee of
26 November 2025 was submitted and approved as a correct record.
(ii) Executive Sub-Committee of Finance and Resources Committee -
16 December 2025
The minute of meeting of the Executive Sub-Committee of the Finance
and Resources Committee of 16 December 2025 was submitted and
approved as a correct record.
Provost X McDade and Bailie C Ahern noted their dissent.
3(i)
Page 5 of 186

Page 6

DRAFT
(iii) Employees Joint Consultative Committee - 17 September 2025
The minute of meeting of the Employees Joint Consultative Committee of
17 September 2025 was submitted and noted.
4. Outstanding Business Statement
Resolved:
(i) The status of action in the Outstanding Business Statement (26/35) be noted and
completed actions removed accordingly.
(ii) It be agreed that information relating to actions listed on the Outstanding
Business Statement be circulated to all Elected Members on public committee
items. 
5. 2025/26 Revenue Budget - Update No. 3
There was submitted a report by the Chief Finance Officer (26/36) providing an
update on progress with the 2025/26 General Fund Revenue Budget based upon the
November 2025 ledger, updated for any subsequent known material movements, and
the projected financial position of the Housing Revenue Account.
Resolved:
(i) The contents of Report 26/35, be noted.
(ii) The projected outturn for the General Fund, as set out in Section 4 of Report
26/35 and Appendices 1 and 2, be noted.
(iii) The adjustments to the 2025/26 General Fund budgets, as detailed in Section 5
of Report 26/35 and Appendices 1, 2, 4, 5, 6 and 7, be approved.
(iii) The financial risks, as set out in Section 6 of Report 26/35 and Appendix 8, be
noted.
(There was a 10-minute recess and the meeting reconvened at 2.35pm).
6. Composite Capital Budget 2025/31 and Housing Investment Programme
2025/30 – Monitoring Report No.3
There was submitted a report by the Chief Finance Officer (26/37) (1) providing a
summary position to date for the 6-year Composite Capital Budget for 2025/26 to
2030/31 and the 5-year Housing Investment Programme for 2025/26 to 2029/30; and
(2) seeking approval for adjustments to the programmes.
Resolved:
(i) The contents of Report 26/37, be noted.
(ii) The proposed adjustments to the six-year Composite Capital Budget 2025/26 to
2030/31, as set out in Sections 4 and 5 of Report 26/37 and summarised in
Appendices I and II, be approved.
(iii) The proposed adjustments to the Housing Investment Programme Budget
2025/26 to 2029/30, as set out in Section 6 of Report 26/37 and summarised in
Appendix III, be approved.
(iv) Progress with the delivery of major Capital projects, as summarised in Appendix
IV to Report 26/37, be noted.
Page 6 of 186

Page 7

Perth and Kinross Council
Finance and Resources Committee
Employees Joint Consultative Committee
Minute of hybrid meeting of the Employees Joint Consultative Committee held
Meeting Room 410, 2 High Street, Perth on Wednesday 3 December 2025 at
1.30pm.
Present: Representing Perth and Kinross Council:
Councillors K Allan, S McCole and M Frampton.
Present: Representing Trade Unions:
C Weston (EIS)
V Leonard (GMB)
S Hope (UNISON)
M Mackie (SSTA)
In Attendance:  L Hamilton, P Johnstone, E Bayne, L McGeorge, F Mackay,
D Black, S Stephen, B Kinnear, S Kinnear, K Robertson, J McCole,
A McConnachie.
Apologies: Councillor J Rebbeck with Councillor M Frampton substituting,
D MacLuskey, N Ferry, S Robertson and S Topen-Cooper
S Hope in the Chair.
1. Welcome and Apologies
S Hope welcomed all present to the meeting and apologies were noted as
above.
2. Declarations of Interest
There were no declarations of interest made in terms of the Councillors’ Code
of Conduct.
3. Minute of Meeting of Employees Joint Consultative Committee of
17 September 2025
The minute of meeting of the Employees Joint Consultative Committee of
17 September 2025 was submitted and approved as a correct record.
4. Matters Arising
(i) Medication Errors
B Kinnear, Service Manager, Adult Social Work & Social Care
Services, P&K HSCP gave a verbal update, outlining that there is a
3(ii)
Page 7 of 186

Page 8

high number of medication incidents with the highest being “recording
error”. He assured the committee that all incidents are fully investigated
and analysed with additional training provided where errors have
occurred.  Actions being taken in the service include continuing to raise
awareness and provide clarification of when an incident is reported and
recorded, follow up training as appropriate.  He stated that the number
as a percentage of visits carried out is low and nobody was at risk of
significant harm. Further he advised that all incidents are reported to
the Care Inspectorate with a number of improvement measures taken,
including all staff having their standards and practices observed and
thereafter are reviewed annually.
In response to Councillor McCole asking about whether third party
providers the Council work with report their errors to the Council,
B Kinnear said they should and there is a working group looking at third
party reporting and monitoring third parties.
B Kinnear left the meeting.
(ii) Industrial Injuries Guidance
In response to C Weston asking if following the previous meeting this
had been reviewed as agreed, E Bayne said there are ongoing
discussions and the next action will be to engage with the unions.
(iii) Zero Tolerance Posters
In response to C Weston asking Councillors McCole and Allan what
has been done following the previous meeting where they agreed to
take zero tolerance posters forward as an action to follow up,
Councillor McCole said she understands from officers progress has
been made.
5. People and Culture – Equality Update
There was a report submitted by S Kinnear, Employee Engagement Officer
providing an update on recent and planned employment equalities
activities within Perth & Kinross Council.
In addition to the report S Kinnear said that all staff networks are meeting
again and that in relation to the anti-asylum protests and PKC’s status as a
Council of Sanctuary, David McPhee has been delivering a presentation to
SMTs which can be shared or delivered on request.
In response to Councillor McCole asking if what is being done in relation to
menopause is sufficient, E Bayne said menopause and managers awareness
is more commonplace in the conversations at work than it used to be and
reasonable supportive steps are being taken where needed.
Page 8 of 186

Page 9

In response to S Hope asking if more could be done to promote the various
groups to the unions, E Bayne said there is a monthly Health and Wellbeing
Briefing that he will share with them.  We would also welcome the unions
sharing and raising awareness of content.
F Mackay said getting resources to schools can be challenging and there is a
Staff Wellbeing Project looking at alternative arrangements for education staff
who cannot attend meetings or events held centrally.
In response to V Leonard asking about specific training for managers and
whether people are aware of the additional support that is out there such as
Access to Work, E Bayne said in the past our Occupational Health provider
has delivered menopause awareness training and it’s something that can be
looked at and those additional supports such as Access to Work are part of
the conversations his team has with managers.
Resolved:
The Committee noted the ongoing employment equality activities
and their alignment with the Council’s strategic objectives.
(S Kinnear left the meeting.)
6. Health and Safety Performance Report Quarter 2 2025/26 – July –
September 2025
There was a report submitted by the Health and Safety Team Leader
(G/25/174) informing and assisting the Employees Joint Consultative
Committee in monitoring health and safety compliance and performance
across Perth and Kinross Council and providing an overview of health and
safety activities undertaken.
Resolved:
The Committee noted the contents of the report.
7. Fire Safety Performance Report – Quarter 2 2025/26 – July – September
2025
There was a report submitted by the Health and Safety Team Leader
(G/25/175) informing and assisting the Employees Joint Consultative
Committee in monitoring fire safety performance across Perth and Kinross
Council and providing an overview of fire safety activities undertaken.
In addition to the report L Hamilton said they are working on a Fire Safety
Management course for next year.
In response to Councillor McCole asking if some information on outstanding
actions could be included in the next report, L McGeorge said that this would
be provided.
Page 9 of 186

Page 10

In response to Councillor Allan asking why children set off the fire alarms and
L McGeorge asking if there is anything they can do to minimise the chances
of it happening, S Stephen advised that many of the false activations of alarm
systems in schools were as a result of children with additional support needs
and schools do proactively look for solutions to stop it happening.
Resolved:
The Committee noted the contents of the report
8. Staff Reporting: Incidents of Violence/Aggression and incidents of
Distressed/Challenging Behaviour in Education Settings – Term 1
2025/26
There was a report submitted by the Quality Improvement Manager, Inclusion
and Additional Support, and Inclusion Quality Improvement Officer (G/25/176)
on Education and Learning’s performance in managing and reducing staff
reports of incidents of distressed, challenging, violent, or aggressive
behaviour that have impacted staff in the workplace.
It also provides a summary of the information gathered in Term 1 of academic
year 2025/26 in relation to staff reports of incidents in schools and other
educational settings which had an emotional or physical impact on them and
information on the activity of an established Working Group to prevent and
reduce the number of incidents.
The teachers unions submitted written questions in advance of the meeting
with F Mackay and C Weston agreeing to a written response with discussion
at a future Reducing Challenging Behaviour Group.
S Stephen said they are in year 2 of the new child’s plan and know what the
next steps with that will be and the Scottish Government are already
reviewing the revision of physical intervention guidance with no timescale on
the outcome.
In response to Councillor Allan asking if there were resources they could help
with, S Stephen said potentially around ASN and ISP and would detail them in
an email to Councillor Allan.
In response to S Hope asking about resources being directed to the small
proportion of children in P1 involved in incidents, F Mackay said P1 children
have not been in a school environment before, and it can take a couple of
terms for improvements to show from measures that have been put in place.
P1 incidents are the lowest they have been for a number of years.
Following feedback they are looking at reinstating 2 in-service days in August
and there is a proposal for a full week off in February.
In response to Councillor McCole asking about investment in ASN/ISP
provision for early years and childcare, F Mackay said there has been this
Page 10 of 186

Page 11

year focussed on early years which should improve independence and
communication skills.
K Robertson said school holidays have been approved up to 26/27 with dates
for 27/28 to 28/29 being drafted and will be put to unions encompassing
F Mackay’s earlier points.
Resolved:
The Committee noted the content of the report and ongoing activity by a multi-
agency group to reduce and prevent future incidents of distressed
challenging, violent or aggressive behaviour and improve staff experience in
Early Learning and Childcare (ELC) settings and schools
9. Health and Wellbeing Update
There was a report submitted by the People and Culture Manager (G/25/177)
providing an update on current Health and Wellbeing data and current Health
and Wellbeing activities.
In response to C Weston asking how PKC’s absences compare nationally,
E Bayne said on 31 March 2025 they were the 10th lowest out of 32 for
teaching staff and 4th lowest for all staff with work being done to improve
those figures.
Resolved:
The Committee noted the position regarding Health and Wellbeing
10. Employee Survey
P Johnstone had hoped to have overview of the data but it was not available
for the meeting.
Will be brought to the next meeting.
11. Any Other Competent Business
-
12. Date of Next Meeting
1 April 2026
Page 11 of 186

Page 12

Page 12 of 186

Page 13

Memorial Safety in Council Cemeteries
Background
Perth and Kinross Council takes its statutory health and safety obligations seriously
and following the Fatal Accident Inquiry Recommendations in 2018 and changes in
legislation in 2025 has implemented a Memorial Safety in Council Cemeteries
programme to review headstones every five years.
Currently if a headstone is found to be unsafe it will be laid flat for 3 months and the
lair owner will be contacted to advise them. If it remains unrepaired after 3 months,
then it will be “socketed” (one third of the headstone placed below the ground).
Committee Resolves
The Committee requests that officers engage with elected members on an enhanced
Memorial Safety in Council Cemeteries programme that provides more engagement
with lair owners and the local community and bring a cost for the implementation of
required enhancements to the June 2026 Finance & Resources Committee.
Proposed by Provost Xander McDade
Seconded by Councillor Colin Stewart
4
Page 13 of 186

Page 14

Page 14 of 186

Page 15

Finance and Resources Committee
Outstanding Business Statement (OBS)
(Report No. 26/109)
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS.
No Minute
Reference
Subject Title Outstanding Action Update Lead Officer/
Service
Action
Due
Action
Expected
41. 4 February
2026
Item 5.
2025/26 Revenue
Budget – Update
No. 3
Information be provided
on the projected increase
in residual waste disposal
costs and comparisons to
be provided in the new
and previous contract gate
fee prices.
EM Briefing Note was
circulated to members
on 14 April 2026.
Fraser Crofts Complete 22 April
2026
5
Page 15 of 186

Page 16

Page 16 of 186

Page 17

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee: Finance and Resources Committee
Date of Meeting: 22 April 2026
Report Title: 2025/26 Revenue Budget – Update No. 4
Report Number: 26/110
Report Author: Scott Walker, Chief Finance Officer
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________
1. Purpose
1.1 The purpose of this report is to provide an update on progress with the
2025/26 General Fund Revenue Budget based upon the January 2026 ledger,
updated for any subsequent known material movements, and the projected
financial position of the Housing Revenue Account.
1.2 The total net projected underspend on the 2025/26 General Fund
Management Budget, is £2.501 million (or 0.5% of the 2025/26 Revised
Management Budget) which represents a positive movement of £267,000
(see Appendix 1).
1.3 The report also seeks approval for several adjustments to the 2026/27
Revenue Budget approved by Council on 4 March 2026 (Report No. 26/54
refers) (see Appendix 9).
1.4 Sections
2. Recommendations
3. Background
4. 2025/26 Revenue Monitoring
 Service Budgets
 Corporate Budgets
 Funding
 Other Updates
5. 2025/26 Revenue Budget Adjustments
 Additional Funding
 Virements
 Movements in Reserves
6. 2026/27 Revenue Budget Adjustments
6
Page 17 of 186

Page 18

7. Financial Risks
8. Workforce Management Updates
9. Conclusion
10.Impact and Value Assessment
11.Appendices
2. Recommendations
It is recommended that the Committee:
2.1 Note the contents of the report,
2.2 Note the projected outturn for the General Fund set out in Section 4 and
Appendix 1 and 2,
2.3 Approve the adjustments to 2025/26 General Fund budgets set out in Section
5 and Appendices 1,2,4,5,6 and 7,
2.4 Approve the adjustments to the 2026/27 General Fund budgets set out in
Section 6 and Appendix 8.
2.5 Note the financial risks set out in Section 7 and Appendix 9.
2.6 Approve the workforce management measures set out in Section 8.
3. Background
3.1 This report updates the Committee on progress with the 2025/26 Revenue
Budget.  Appendix 1 to this report summarises the current projected year end
(outturn) position for each Service based upon the January 2026 ledger,
updated for any subsequent known material movements.
3.2 The budget reflected in Column 1 of Appendix 1 to this report is that
approved by the Council in setting the final 2025/26 Revenue Budget on 26
February 2025 (Report No. 25/36 refers).  In addition, adjustments approved
by the Finance and Resources Committee on 30 April, 25 June, 1 October, 26
November 2025 and 4 February 2026 (Report No’s 25/99, 25/172, 25/248,
25/326 and 26/36 refer) are reflected in Appendix 1 (Column 2).  In addition,
approval to apply additional resources to Perth and Kinross Health and Social
Care Partnership on 29 October 2025 is also reflected (Report No 25/278
refers).
4. 2025/26 Revenue Monitoring
Service Budgets
4.1 The total net projected underspend on Service budgets, which is
summarised in Section 1 of Appendix 1 to this report, is £2.539 million
which represents 0.7% of total net Service expenditure (a positive movement
of £279,000).
Page 18 of 186

Page 19

4.2 Details of variances against individual Service budgets are shown in
Appendix 2 to this report with the most significant variances summarised
below.
4.3 The management of Service over and underspends are considered
throughout the financial year and may also form part of the Revenue Budget
strategy for future years.
4.4 There remains a risk that the Council continues to experience increases in
costs over the short to medium term that are higher than budgeted.  Going
forward, this may continue to have an impact on projected outturns and future
years’ budgets.
Education and Learning
4.5 There is currently a projected underspend for Education and Learning
excluding Devolved School Management (DSM) and the Pupil Equity Fund
(PEF) of £1.126 million or 0.6% of the budget which represents a positive
movement of £291,000.  The individual elements contributing to this position
are summarised in the following table with commentary on the significant
variances below.
Projected Outturn MovementFunction
£’000 % £’000
Education and Learning Core Underspend (6) 0.5 (14)
Nursery Sector Underspend (722) (2.6) (134)
Primary Sector Overspend 797 1.5 (111)
Secondary Sector Underspend (566) (10) 1
Special Sector Underspend (325) (1.8) (9)
Home to School Transport Underspend (304) (2.7) (24)
TOTAL Underspend (1,126) (0.6) (291)
4.6 In the Nursery Sector, there is an increase in the projected underspend of
£134,000 due to updated staff cost projections.
4.7 In the Primary Sector, there is a reduction in the projected overspend of
£111,000 due to updated staff cost projections.
4.8 In the Devolved School Management Scheme there is a projected
underspend of £359,000 which represents less than 1% of the total budget. 
However, some schools are experiencing challenges in delivering approved
staff slippage targets and facing inflationary pressures against budgets that
have been reduced over previous years.  The budgets for the Devolved
School Management scheme are allocated by financial year (April – March),
whereas expenditure is incurred by academic year (August – June).
4.9 At this stage of the academic year, expenditure met from the Pupil Equity
Fund (PEF) is projected to be £100,000 less than budget.  It is anticipated
this this expenditure will be incurred prior to the conclusion of the 2025/26
academic year.
Page 19 of 186

Page 20

Children, Families and Justice
4.10 There is currently a projected overspend for Children, Families and Justice of
£50,000 or 0.2% of the budget, which represents an adverse movement of
£205,000.  The individual elements contributing to this position are
summarised in the following table with narrative on the significant variances
below.
Projected Outturn MovementFunction
£’000 % £’000
Children & Families Overspend 50 0.2 205
Justice Service On Target - - -
TOTAL Overspend 50 0.2 205
4.11 In Children and Families, there is a net increase in the projected
overspend of £205,000.  This is primarily due to an increase in the costs of
residential placements due to both an increase in the volume of placements
and length of stays, and the non-achievement of slippage.
Economy, Development and Planning
4.12 There is currently a projected underspend for Economy, Development and
Planning of £315,000 or 2.0% of the approved budget which represents a
positive movement of £55,000.  The individual elements contributing to this
position are summarised in the following table with narrative on the significant
variances below.
Projected Outturn MovementFunction
£’000 % £’000
Service Wide Underspend (173) (2.8) (100)
Tourism, Culture and Place Overspend 358 7.6 245
Development Management and
Building Standards
Underspend (500) - (200)
TOTAL Underspend (315) (2.0) (55)
4.13 Service Wide there is an increase in the projected underspend of £100,000
based on the latest staff cost projections.
4.14 In Tourism, Culture and Place, there is an increase in the projected
overspend due to reduced income from events and a delay in the delivery of
approved savings.
4.15 In Development Management and Building Standards, there is an
increase in the projected underspend of £200,000 due to additional income
from planning applications.
Environment and Infrastructure
4.16 There is currently a projected overspend for Environment and Infrastructure
of £225,000 or 0.7%, which represents a positive movement of £50,000.  The
Page 20 of 186

Page 21

individual elements contributing to this position are summarised in the
following table with narrative on the significant variances below.
Projected Outturn MovementFunction
£’000 % £’000
Service Wide Overspend 300 2.4 200
Traffic and Network Underspend (150) (12.0) -
Waste Disposal Underspend (400) (4.5) (250)
Refuse Collection Overspend 175 3.4 -
Fleet Overspend 200 - -
Roads Maintenance
Partnership
Overspend 100 4.1 -
TOTAL Overspend 225 1.0 (50)
4.17 Service wide there is an increase in the projected overspend of £200,000
due to a reduction in income from capital recharges as staff were diverted to
response to severe weather and emergency events.
4.18 In Waste Disposal, there is an increase in the projected underspend of
£250,000 due to additional income from recyclates, reduced waste disposal
costs and current projections on fuel costs.
4.19 Since the last update to the Finance and Resources Committee, there have
been no severe weather events requiring a significant Council response. 
Therefore, it is now anticipated that there will not be an impact on
unearmarked reserves from severe weather.
Housing and Communities
4.20 The projected outturn for Housing and Communities is currently anticipated
to be £369,000 or 1.9% more than budget, an adverse movement of
£119,000.  The individual elements contributing to this movement are
summarised in the following table with commentary on the significant
variances below.
Projected Outturn MovementFunction
£’000 % £’000
Service Wide Underspend (29) - (22)
Bereavement Services Overspend 124 15.1 110
Public Transport Unit Overspend 95 2.4 20
Parking and Civil
Contingencies
Overspend 105 - 11
Specialist Services Overspend 74 1.2 -
TOTAL Overspend 369 1.9 119
4.21 In Bereavement Services, there is an increase in the projected overspend
of £110,000 due to an anticipated shortfall in the level of income.
Page 21 of 186

Page 22

Property Services
4.22 The projected outturn for Property Services is currently anticipated to be
£212,000 or 0.3% less than budget. The individual movements are
summarised in the following table with commentary on the significant
variances below.
Projected Outturn MovementFunction
£’000 % £’000
Service Wide Overspend 619 1.5 26
Energy Underspend (1,049) (13.5) (53)
Facilities Management Overspend 507 6.5 61
Catering Underspend (289) (3.5) (34)
TOTAL Underspend (212) (0.3) (0)
4.23 On Energy, there is an increase in the projected underspend of £53,000
based on the latest consumption information.
4.24 On Facilities Management, there was an increase in the projected
overspend of £61,000 in part due to additional employment costs following
the agreed reduction in cleaning hours.
Legal and Governance
4.25 Within Legal and Governance there is a projected underspend of £111,000
or 2.7%, which represents an adverse movement of £15,000.
4.26 Management of A K Bell Library Archives has transferred from Culture Perth &
Kinross to the Council.   Access to the Archive is free but there are fees and
charges in place for making copies of records and staff-facilitated research,
etc.   These fees will be added to the Council’s 26/27 Scheme of Charges,
with the rates to be consistent with corresponding CPK charges which will
maintain consistency and prevent confusion service users – there is no
change to existing archive charges.
Customer and Digital Services
4.27 The projected outturn for Customer and Digital Services is currently
anticipated to be £662,000 or 4.9% less than budget, which represents a
favourable movement of £81,000.  The individual elements contributing to
this movement are summarised in the following table with commentary on the
significant variances below.
Projected Outturn MovementFunction
£’000 % £’000
IT and Customer Services Underspend (569) (7.2) 92
Revenues and Benefits Underspend (93) 1.4 (173)
TOTAL Underspend (662) (4.3) (81)
4.28 In IT and Customer Services there is a reduction in the projected
underspend of £92,000 due to updated staff costs projections.
Page 22 of 186

Page 23

4.29 In Revenues and Benefits there is an increase in the projected underspend
of £173,000 due to additional statutory income and updated staff costs
projections.
Strategic Planning, People and Performance
4.30 The projected outturn for Strategic Planning and Performance is £511,000
or 8.5% less than budget which represents a favourable movement of
£35,000.
Finance and Business Support
4.31 The projected outturn for Finance and Business Support is currently
anticipated to be £246,000 or 2.3% less than budget which represents a
favourable movement of £106,000 due to updated staff cost projections.
Scott Street Fire
4.32 To 31 March 2026, the Council incurred approximately £2.3 million
responding to the fire that took place at Scott Street fire.  It is anticipated a
further £300,000 will be incurred post 1 April 2026.
4.33 Interim invoices have been issued to insurance companies, which along with
the funding from the Scottish Government and the Council’s previous
commitment indicate that there will be no financial impact on the level of
Council reserves in 2025/26.
4.34 As the works complete over the coming weeks, and the final invoices are
issued to and paid by insurance companies, a more complete picture of the
financial impact will emerge.
4.35 It is anticipated the final financial implications of the Scott Street Fire will be
included in revenue monitoring report number five that will be considered by
the Finance and Resources Committee in June 2026.
Corporate Budgets
4.36 Included within Section 2 of Appendix 1 is an update on the Council’s
Corporate budgets.  More information on variances against individual budget
headings is set out below.
Health and Social care
4.37 On 18 March 2025, Perth and Kinross Integration Joint Board (IJB)
considered a report on the 2025/26 Financial Position, based on financial
information to 31 December 2025 (Report No. G/26/27 refers).
4.38 This latest update to the IJB included an updated projected net overspend
across the Health and Social Care Partnership of £4.273 million (a reduction
of £141,000 from the last update) which is summarised in the following table
Page 23 of 186

Page 24

and in detail in Appendix 3.  This position remains consistent with the
financial challenges facing health and social care across Scotland.
4.39 The projected overspend on social care is now £3.899 million which is a
reduction of £268,000 since the last update.  This is result of reduction in the
projected 
Social
Care
£m
Health
£m
Health and Social
Care Partnership
£m
Gross Projected Overspend 4.313 1.074 5.387
Application of Remaining
General Reserves
(0.164) - (0.164)
Financial Recovery Actions
- (Part A)
(0.250) (0.700) (0.950)
Net Projected Overspend 3.899 0.374 4.273
4.40 On 29 October 2025, the Council agreed to provide up to £4.180 million of
additional financial support in 2025/26 (Report No. 25/278 refers).  This
funding will meet the costs associated with high service demand and provide
time to complete the work outlined in part A and B of the Financial Recovery
Plan.
4.41 The latest information considered by the Integration Joint Board, reduces the
level of additional funding required from the Council by £281,000 and this has
been included in the General Fund Reserves position set out in Appendix 7.
Funding
4.42 Further information on the Council’s funding is set out within Section 3 of
Appendix 1.  More information on variances against individual budget
headings are set out below.
Council Tax Income
4.43 The amount of income the Council will generate from Council Tax is
dependent on two main factors, firstly the collection levels and secondly, the
number of Band D properties on the Valuation Roll.
4.44 Monitoring of Council Tax collection levels is carried out monthly.  The
following graph sets out collection performance to 31 March 2026 together
with prior year comparative figures for the previous five financial years.
Page 24 of 186

Page 25

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
In Year Collection to 31 March
4.45 Between 2020/21 and 2024/25, the average collection figure to 31 March was
97.21%.  The actual collection figure to 31 March 2026 was 97.21% which is
0.27% more than the five-year average and 0.14% more than the comparable
position in 2025.
April May June July Aug Sept Oct Nov Dec Jan Feb Mar
0.3%
0.2%
0.1%
0.0%
-0.1%
-0.2%
-0.3%
-0.4%
Movement in Council Tax Collection
Average v24/25
4.46 Secondly, in setting the Council’s Revenue Budget, assumptions are made on
increases in the number of Band D equivalent properties.  The graph set out
below suggests that actual growth levels are in line with budget assumptions.
Page 25 of 186

Page 26

4/1/2020
7/1/2020
10/1/2020
1/1/2021
4/1/2021
7/1/2021
10/1/2021
1/1/2022
4/1/2022
7/1/2022
10/1/2022
1/1/2023
4/1/2023
7/1/2023
10/1/2023
1/1/2024
4/1/2024
7/1/2024
10/1/2024
1/1/2025
4/1/2025
7/1/2025
10/1/2025
1/1/2026
4/1/2026
78,000
77,000
76,000
75,000
74,000
73,000
72,000
71,000
Council Tax - Number of Band D Equivalent Properties
budget Band D Equivalents
4.47 Currently, the level of Council Tax income is projected to be on target against
the budget assumptions which is reflected in Appendix 1.
Non-Domestic Rates
4.48 The actual collection rate to 31 March 2026 was 96.99%, compared to
97.10% for the same period in 2024/25.
Other Updates
Housing Revenue Account
4.49 In terms of recurring activity across the Housing Revenue Account, there is
an increase in the projected underspend of £217,000 for the current financial
year.  The main elements of the movements are summarised below and set
out in Appendix 4.
4.50 The significant factors contributing to this positive movement are as follows. 
An increase in the net projected underspend in Repairs and Trades
(£107,000) due primarily to projected underspends on planned maintenance;
an increase in the projected underspend in Improvements (£56,000); and an
increase in the projected underspend in Localities (£157,000) due, in the
main, to underspends within sheltered housing.  This is partially offset by an
increase in the projected overspend on General Administration (£103,000)
due to additional loan charges following an acceleration of the council house
buy back programme.
Page 26 of 186

Page 27

4.51 This net increase in the projected underspend allows for a £217,000 will be
applied to the CFCR budget to increase the support to the HRA Capital
Programme from the Revenue Budget by that amount.
4.52 There is also a reduction in the funding required from earmarked HRA
Reserves of £11,000 due to projected underspends in Localities.
4.53 The net result of this latest monitoring on Housing Revenue Account Balances
is as follows –
 HRA unearmarked Reserves - £1.2 million
 HRA earmarked Reserves - £979,000
5. 2025/26 Revenue Budget Adjustments
Additional Funding
5.1 Since elected members approved the 2025/26 Revenue Budget update on 4
February 2026 (Report No. 26/36 refers), notification has been received of
additional resources in the current financial year from several sources as set
out below.  To ensure that the 2025/26 Management Budget continues to
reflect the operational requirements of the Council, several adjustments are
required, which are summarised below and included either in Appendix 1 or
Appendix 5.
Scottish Government – Revenue Support Grant:
 Additional Children’s Social Care pay funding - £146,000 (Reserves)
5.2 The Scottish Government has advised that the increase in Revenue Support
Grant identified above of £146,000 will be made through a redetermination of
the Council’s funding.  It is therefore necessary to adjust budgets for reserves
and Revenue Support Grant.
Other Funding
5.3 Other funding amounting to £150,000 has been paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.  Details of this funding is set out in
Appendix 5.
5.4 ACTION: The Committee is asked to note the receipt of £150,000 of
additional resources, with this funding being reflected within Children,
Families and Justice as additional grant income.  The current projected
outturn assumes that all these additional resources will be fully expended in
2025/26 or will be carried forward under the terms of the grant award.
Contribution to/from Capital Fund
5.5 In line with the strategy for managing the Council’s Capital Programme over
the medium term, it is recommended that the eventual over or underspend on
Page 27 of 186

Page 28

Capital Financing Costs and Interest on Revenue Balances be transferred
from or to the Capital Fund.
5.6 The latest monitoring indicates a projected reduction in capital financing costs
(loan charges) of £178,000 based on the latest treasury management activity
and an increase of £175,000 in income from interest on revenue balances due
to updated cashflow projections.  This will result in an increased Contribution
to the Capital Fund of £353,000 in the current financial year.  This is
consistent with the planned use of the Capital Fund to manage the revenue
cost of supporting the Capital budget over the short term.
5.7 ACTION: The Committee is requested to approve the virement of £178,000
from the Capital Financing Costs (Loan Charges) Budget and £175,000 to
Interest on Revenue Balances with a corresponding increase in the projected
Contribution to the Capital Fund.  These adjustments have been reflected in
Appendix 1 (Column 4) to this report.
Service Virements
5.8 To ensure that the 2025/26 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
adjustments that have been line with the Scheme of Administration.
Movements In Reserves
5.9 Included at Appendix 7 is an update on the Council’s General Fund Reserves
which includes the following:
 Earmarked and unearmarked Reserves at 31 March 2025 (per audited
Annual Accounts).
 previously approved contributions to and from earmarked Reserves in
2025/26, 2026/27 and 2027/28.
 The impact of proposals within this report on earmarked Reserves.
 The impact of the latest revenue monitoring on the level of
unearmarked Reserves.
5.10 The earmarked Reserves are presented under three headings as follows:
i. Balances held under statute / regulation – these earmarked Reserves
are prescribed under legislation, and the Council has limited discretion in
how they are applied.
ii. Balances held for specific (previously approved) purposes – the purpose
of these earmarked Reserves has been previously approved by Council
in either the Reserves Strategy or Annual Accounts
iii. Balances held for other purposes – the creation of these earmarked
Reserves has been approved by Council, but not specific proposals.
5.11 Going forward proposals involving earmarked Reserves under i. and ii. above
will be advised to Committee in summary as Council either has limited
discretion or previously approved their application.  Proposals to apply
Page 28 of 186

Page 29

earmarked Reserves under iii. above will include more detail for elected
member consideration.
Balances Held Under Statute / Regulation
5.12 The following are adjustments to the earmarked Reserves held under statute
or regulation.
 £170,000 from Revenue Grants to support eligible expenditure from the
No One Left Behind project
 £642,000 from Council Tax Income for Affordable Housing as a
contribution towards the HRAs new build programme.
 £279,000 to the Car Park Trading Account based on the projected
underspend included in Appendix 2.
 £380,000 from the Car Park Trading Account to fund key local bus
services in 2026/27 and 2027/28.
Balances Held for Specific (Previously Approved) Purposes
5.13 These earmarked Reserves have previously been approved by elected
members in their consideration of the Reserves Strategy or Annual Accounts.
5.14 Specifically, authority is sought to adjust the following earmarked Reserves
identified below:
 £618,000 to Council Approved Revenue Budget Flexibility to reflect the
timing of expenditure towards approved projects as set out in Appendix 6.
 £40,000 from the Council Approved Revenue Budget Flexibility for
2025/26 resilience projects.
 £20,000 returned to the Works Maintenance Reserve for contaminated
land for works in 2026/27 (Housing and Communities)
 £11,000 from Historic Child Abuse Scheme for costs incurred (Children,
Families and Justice)
 £150,000 returned to the Extended Producer Packaging reserve due to
slippage on waste projects (to now be drawn down in 2026/27)
(Environment and Infrastructure)
5.15 ACTION: The Committee is asked to approve the transfers to or from
earmarked Reserves set out in paragraph 5.14 above.  These adjustments
are reflected in Appendix 1 (Column 5) to the report.
Balances Held for Other Purposes
5.16 Approval is sought for an adjustment relating to the earmarked Reserve for
Anti-Poverty of £31,000 to reflect actual expenditure plans.
5.17 ACTION: The Committee is asked to approve the transfer of £31,000 to the
Anti-Poverty earmarked Reserve from Strategic Planning, People and
Page 29 of 186

Page 30

Performance.  This adjustment is reflected in Appendix 1 (Column 5) to the
report.
Unearmarked Reserves
5.18 Based on the latest information, the level of unearmarked Reserves at 31
March 2026 is projected to be £17.380 million or 3.5%.  This position will
undoubtedly change once the final outturns are available.
5.19 The level of unearmarked Reserves has increased by £542,000 since the last
update in February due to further improvements in the projected outturn
position.
5.20 The Reserves Strategy sets out a range of between 2% and 4%.
6. 2026/27 Revenue Budget
2026/27 Additional Funding
6.1 Other funding amounting of £247,000 will be paid outside the Revenue
Support Grant mechanism as Other Grant income and is, therefore, cost
neutral in terms of the budget summary.  Details of this funding is set out in
Appendix 5.
2026/27 Virements
6.2 To ensure that the 2026/27 Management Revenue Budget continues to reflect
current Service needs and operational requirements there are several
virements that are reflected in Appendix 1 (column 4) that have been
processed in line with the Scheme of Administration.
2026/27 Movements in Reserves
6.3 There are a several adjustments set out above, where resources were applied
to Reserves in 2025/26 that require to be drawn down in 2026/27 which are
summarised as:
 £150,000 to Environment and Infrastructure from the Extended
Producer Packaging earmarked Reserve to reflect expenditure plans.
 £190,000 to Housing and Communities from the Car Park Trading
account to support local bus services.
 £20,000 to Housing and Communities from the Works Maintenance
earmarked Reserve to reflect expenditure plans.
 £26,000 to Housing and Communities from the Communities
earmarked Reserve to support community events relating to the World
Cup.
 £618,000 to Services from Council Approved Revenue Budget
Flexibility carried forward from 2025/26 to 2026/27 as detailed in
Appendix 6.
Page 30 of 186

Page 31

 £41,000 to Economy, Development and Planning from Financial
Assistance to support civic events in 2026/27.
6.4 ACTION: The Committee is asked to approve the adjustments set out at in
paragraphs 6.3 which are reflected in Appendix 8 (Column 5) to this report.
6.5 There has been a series of fly-tipping incidents on the Northfield Site in Perth
City with a significant amount of waste having been dumped illegally. It is
estimated that the cost of clearing the site will be in the region of £20,000, the
majority of this being attributable to the physical disposal of the waste material
with the Council’s approved waste disposal contractor. To that end, approval
is sought to draw down the funding from the Communities earmarked
Reserve.
6.6 ACTION: The Committee is asked to approve the transfer of £20,000 from the
Communities earmarked Reserve to Environment and Infrastructure to fund
this work which is reflected in Appendix 8 (Column 5) to this report.
6.7 The Council has been approached by Heartland to consider providing
financial underwriting support in response to several exceptional and largely
external factors that have created a material financial risk to the delivery of
two established and emerging cultural events.
6.8 The pressures are not the result of poor planning or delivery failure, but of
circumstances outside the organiser’s control, leading to a relatively modest
short-term funding gap that threatens the viability of both events if not
addressed before critical contractual deadlines. Failure to act may result in
event cancellation, leading to immediate economic loss, reputational damage,
and a longer-term erosion of confidence in Pitlochry and Perth and Kinross as
viable locations for major events.
6.9 By providing a level of financial support the Council would be protecting and
sustaining events that generate significant visitor spend, local employment,
and place-based reputational benefit for Pitlochry and Perth and Kinross more
widely, while also safeguarding longer-term strategic opportunities. The
events have demonstrably strong attendance potential, growing audiences,
and clear pathways to future financial sustainability once current abnormal
conditions ease and baseline data is established.
6.10 Approval in principle is sought to underwrite up to £30,000 to take this
forward.  This authority would provide officer with time to work with the
organiser and security to allow the event to proceed.  It would be the intention
to provide an update the Finance and Resources Committee in June 2026
7. Financial Risks
7.1 In preparing the Council's revenue monitoring, officers have considered the
key strategic, operational and financial risks facing the Council over this
period.  Whilst the risks may be managed in the current financial year, there is
the potential for there to be an impact in the future.
Page 31 of 186

Page 32

7.2 To alleviate the impact these risks may have if they occur, a number of
general risk mitigation factors are utilised by the Council which include
detailed budget monitoring carried out by Services and having general fund
balances available to meet unforeseen expenditure.
7.3 There is clearly a concern that there will be an impact of the global tension on
the cost of Council services.  This is not likely to impact on 2025/26 but will be
kept under review for 2026/27 and beyond.
7.4 Risks are captured within the body of the report with a summary being
maintained in Appendix 9.
7.5 Going forward, risks to the Revenue Budget will be captured with mitigating
actions identified.
8. Workforce Management Updates
Probationary Periods
8.1 The Council is introducing a four month probationary period for all new starts
joining the Council on or after the 1 July 2026.  A structured probationary
period allows time to ensure that the time and effort that is invested in
recruiting a new employee is further enhanced by giving focus to a robust
induction, support and training to perform well in the role.  It also is an
effective tool to assess compatibility with the new job role for both parties. 
Pay and Grading Review
8.2 There is a continuing requirement to future proof the lower end of the SJC
salary scales to ensure that the Council’s salary scales remain fit for purpose.
8.3 The impact of national pay awards over recent years, which has majored on
bottom loaded pay awards and this along with the increases to the Real Living
Wage, require a review of existing scales to ensure that the Council continues
to recognise and value the experience of staff at the lower end of the pay
scales from entry level posts and ensure differentials remain between all
grades.  This will create a more attractive incentive package for both new and
existing employees. 
8.4 Officers intend to meet with SJC unions to consider how to future proof our
scales for the lowest paid employees whilst ensuring we continue to apply
the principles of Fair Work First. 
8.5 It is anticipated that the Committee will receive further updates in June and
September 2026 with the intention being to implement a change in November
2026 alongside the next Real Living Wage increase.
8.6 ACTION The Committee is asked to approve the commencement of a period
of engagement with the progress to be reported back to future meetings of
this committee.
Page 32 of 186

Page 33

Chief Education Officer Remuneration
8.7 A salary adjustment for the Chief Education Officer is required due to the
impact of recent external pay awards / adjustments, specifically teacher pay
awards and job-sizing outcomes.  This has resulted in the salary of the Chief
Education Officer being overtaken by the highest paid head teacher.
8.8 The independent Chief Executive Salary Review agreed by Cosla Leaders in
October 2025 agreed a pay hierarchy in which a nominal 10% step between
Head Teachers and a “Director level Education role” was established as the
“bottom line” in 2025.  Whilst Perth and Kinross Council does not have a
specific Director of Education post, this statutory function is held by the
Strategic Lead, Education & Learning/Chief Education Officer. 
8.9 Given the recent changes to the head teacher salary placing, it is proposed
that the salary of the Strategic Lead, Education & Learning/Chief Education
officer is adjusted with a supplement, consistent with the proposal at
paragraph 8.8 above to ensure that this post is paid more than the highest
head teacher.  This will result in an additional cost of £18,000.  Going forward,
this supplement will be maintained to ensure that the Council is consistent
with the external salary review identified above.
8.10 ACTION The Committee is asked to approve the adjustment to the salary of
the Chief Education Officer set out in paragraph 8.9.
9. Conclusion
9.1 This report provides an update on the financial performance of Perth and
Kinross Council for 2025/26. The report highlights a projected net underspend
of £2.501 million.
9.2 The report also outlines several adjustments to the 2025/26 Revenue Budget,
including additional funding from the Scottish Government and various
virements to ensure the budget aligns with current service needs.
9.3 Financial risks are identified and mitigated through detailed budget monitoring
and the availability of general fund balances.
9.4 The latest monitoring indicates that the Council will have unearmarked
General Fund balances of £17.480 million or 3.5% on 31 March 2026.
9.5 The report recommends approval of the proposed budget adjustments and
notes the importance of continued vigilance in managing financial risks.
9.6 Finally, the report recommends several adjustments to the 2026/27 Revenue
Budget to ensure it also aligns with service activity.
10. Impact and Value Assessment
10.1 This is an operational report, and as such, an impact and value assessment is
not required.
Page 33 of 186

Page 34

11. Appendices
Appendix 1 - 2025/26 Management Budget
Appendix 2 - General Fund 2025/26 Projected Outturn - Service Analysis
Appendix 3 - Perth and Kinross Health and Social Care Partnership - 2025/26
Projected Outturns
Appendix 4 - Housing Revenue Account 2025/26 Projected Outturns
Appendix 5 - Other Grant Funding 2025/26 and 2026/27
Appendix 6 - Council Approved Revenue Budget Flexibility
Appendix 7 - General Fund Reserves Update
Appendix 8 - 2026/27 Management Budget
Appendix 9 - Financial Risks
Page 34 of 186

Page 35

Appendix 1
(Revised)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
2025/26 Previously Movements Virements Movements 2025/26 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
SECTION 1
Service Budgets
Education and Learning 178,397 2,227 31 180,655 179,529 (1,126) (0.6%)
Children, Families and Justice 24,415 510 11 24,936 24,986 50 0.2%
Economy, Development and Planning 14,857 960 (108) 15,709 15,394 (315) (2.0%)
Environment and Infrastructure 31,049 2,131 (14) (190) 32,976 33,201 225 0.7%
Housing and Communities 18,772 779 2 568 20,121 20,490 369 1.8%
Property Services 65,316 1,712 67,028 66,816 (212) (0.3%)
Legal and Governance 4,898 (728) 6 4,176 4,065 (111) (2.7%)
Customer and Digital Services 12,466 932 5 13,403 12,741 (662) (4.9%)
Strategic Planning, People and Performance 6,159 (70) (31) (237) 5,821 5,310 (511) (8.8%)
Projects and Programmes 527 (194) 333 333 0 0.0%
Finance and Business Support 8,521 1,997 1 10,519 10,273 (246) (2.3%)
Directorate Core Costs 570 523 1,093 1,093 0 0.0%
Sub - Total: Service Budgets 365,947 10,779 0 0 44 376,770 374,231 (2,539) (0.7%)
SECTION 2
Corporate Budgets
Health and Social Care 106,313 4,863 111,176 111,176 0 0.0%
Contribution to Valuation Joint Board 1,421 1,421 1,421 0 0.0%
Capital Financing Costs 18,914 2,754 (178) 21,490 21,490 0 0.0%
Interest on Revenue Balances (3,936) (626) (175) (4,737) (4,737) 0 0.0%
Net Contribution to/(from) Capital Fund 5,331 (4,728) 353 956 956 0 0.0%
Contribution to/(from) Insurance Fund 4,000 4,000 4,000 0 0.0%
Trading Operations Surplus (550) (550) (550) 0 0.0%
Support Service External Income (2,323) (2,323) (2,323) 0 0.0%
Tayside Pension Fund 1,711 1,711 1,684 (27) (1.6%)
Apprenticeship Levy 956 956 1,021 65 6.8%
Pay Award (2,800) 2,800 0 0 0 0.0%
Leadership and Procurement (305) 305 0 0 0 0.0%
Council Tax Reduction Scheme 7,400 7,400 7,400 0 0.0%
Discretionary Relief 1,104 1,104 1,104 0 0.0%
Net Expenditure (General Fund) 503,183 16,147 0 0 44 519,374 516,873 (2,501) (0.5%)
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2025/26 REVENUE
BUDGET - SUMMARY
6
Page 35 of 186

Page 36

Appendix 1
(Revised)
(1) (2) (3) (4) (5) (6) (7) (8) (9)
2025/26 Previously Movements Virements Movements 2025/26 Projected Variance Variance
Council Approved in in Revised Outturn to to
Approved Adjustments Funding Reserves Mgt Revised Revised
Budget (Net) Budget Mgt Mgt
Budget Budget
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 %
PERTH
&
KINROSS
COUNCIL GENERAL FUND
2025/26 REVENUE
BUDGET - SUMMARY
SECTION 3
Funding
Revenue Support Grant (304,896) (8,193) (146) (313,235) (313,235) 0 0.0%
Ring Fenced Grant (1,967) (1,967) (1,967) 0 0.0%
Non Domestic Rate Income (63,537) (63,537) (63,537) 0 0.0%
Council Tax Income (119,157) (119,157) (119,157) 0 0.0%
Capital Grant (1,600) (1,600) (1,600) 0 0.0%
Total Financing (491,157) (8,193) (146) 0 0 (499,496) (499,496) 0 0.0%
Financed from/(returned to) Reserves 12,026 7,954 (146) 0 44 19,878 17,377 (2,501)
APPENDIX
1
Page 36 of 186

Page 37

APPENDIX 2
(Revised)
PERTH AND KINROSS COUNCIL - GENERAL FUND 2025/26 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2026)
Variance Variance
£'000 £'000
EDUCATION AND LEARNING
Total (1,126)
NON DEVOLVED
Education and Learning Core
(32) Projected underspend on clothing grants and parent council funding offset by not meeting slippage
target
26 Projected overspend on free school meals over the holiday period due to exceptional closures and
seven week Summer 
Nursery Sector
(722) Projected additional slippage over target due to turnover of staff, lower than anticipated staffing
required for deferred places and lower partner providers payments than budgeted.
Primary Sector
797 Slippage target projected not to be met within primary sector due to the requirement to have a
teacher in front of class at all times.
Secondary Sector
(566) Projected slippage in excess of target due to part year allocation of fte required for new Intensive
Support Provisions.
Special Sector
(610) Projected slippage in excess of target due to turnover of staff and challenges in recruitment of
posts in particular pupil support assistants.
285 Projected overspend on independent school placements due to increased number of placements.
Home to School Transport
(304) Projected underspend due to increased costs being offset by lower number of school days in
financial year 2025/26.  
DEVOLVED SCHOOL MANAGEMENT SCHEME (DSM)
359 Projected underspend of less than 1% of total budget.
(359) To be carried forward
PUPIL EQUITY FUND
100 Projected underspend to be utilised in advance of June 2026.
(100) To be carried forward
CHILDREN, FAMILIES AND JUSTICE
Total 50
Children and Families
(102) Projected overspend due to not meeting slippage target offset by reduction in demand for some
services over 1st Quarter. Movements due to increased costs of continuing care.
(756) Projected under spend on foster, kinship and adoption in part due to reduction in overall
placements in foster carers. This decrease in demand is linked to the new working practices which
include a greater focus on early intervention some of which is funded from the WFWF temporary
funding.
908 Projected over spend on residential placements due to additional placements in excess of budget
and higher inflation uplifts than budgeted. Movement due to two new placements and extension of
one placement due to external provider delays.
ECONOMY, DEVELOPMENT AND PLANNING
Total (315)
Service Wide
(250) Projected slippage across Economy, Development & Planning in excess of slippage target
57 Projected shortfall in sales ledger bad debt provision
20 Projected overspend for contribution towards Tay Cities Deal project management costs
Tourism, Culture and Place
113 Perth Harbour - projected increase in operating costs /shortfall in income.
100 Overspend relating to events 
(5) Events, projected over recovery of income
150 Savings delayed due to the ongoing review of our cultural and leisure ALEOs.
Development Management & Building Standards
(500) Projected additional Planning Application income
SERVICE Summary of Service Variances
6
Page 37 of 186

Page 38

APPENDIX 2
(Revised)
PERTH AND KINROSS COUNCIL - GENERAL FUND 2025/26 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2026)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
ENVIRONMENT AND INFRASTRUCTURE
Total 225
Service Wide
100 Projected non-achievement of slippage target across Environment & Infrastructure
200 Projected shortfall in recharge to capital due to staff dealing with more severe weather and
emergency events
Direct Services - Waste Disposal
(300) Projected additional income from sale of recyclates as a result of the new twin-streaming collection
and favourable market prices.
0 Projected net additional cost on the waste disposal contract as a result of increased residual waste
tonnage and gate fee price
(100) Projected saving on fuel
Direct Services - Refuse Collection
175 Projected net shortfall in commercial waste income
Direct Services - Fleet
200 Projected additional cost of vehicle materials and repairs.
Traffic and Network
(150) Projected additional income from statutory road network works.
Roads Maintenance Partnership
100 Projected additional expenditure on routine and cyclic roads maintenance including emptying of
gullies.
150 Projected overspend on flood maintenance
Street Lighting Partnership
(50) Projected saving on repairs and maintenance
(100) Projected saving on energy due to positive impact of LED replacement programme
HOUSING AND COMMUNITIES
Total 369
Service Wide
(50) Projected slippage across Housing & Communities in excess of slippage target
21 Projected shortfall in recharge to capital
Bereavement Services
14 Projected over spend on loan charges.
110 Projected shortfall in bereavement income
Public Transport Unit
(62) Projected additional income from park and ride departure charges
63 Projected overspend in relation to park & ride expenditure
49 Projected overspend due to health & safety works and a shortfall in income at Perth Bus Station.
45 Projected overspend on tendered service
Parking & Civil Contingencies
105 Projected overspend on Visitor Rangers
324 Projected under-recovery of parking income
(603) Projected underspend on parking expenditure budgets
279 Return net underspend to parking reserve
Specialist Services
74 Projected overspend in property set-up costs for temporary accommodation
PROPERTY SERVICES
Total (212)
Service Wide
382 Projected overspend as not yet meeting slippage target, increased costs for loan charges and
required works for tree surveys and emergency works across the portfolio.
230 Projected overspend on unitary charge due to increased interest rates and historic lifecycle costs
and low income from Campus RHI.
7 Increased costs for grass pitch lets in LAL settings
Energy
(1,049) Projected reduction in energy costs due to reduced rates and consumption.
Page 38 of 186

Page 39

APPENDIX 2
(Revised)
PERTH AND KINROSS COUNCIL - GENERAL FUND 2025/26 PROJECTED OUTTURN  - SERVICE ANALYSIS
(Based on Expenditure to 31 January 2026)
Variance Variance
£'000 £'000SERVICE Summary of Service Variances
Facilities Management
257
Overspend due to delay in implementing new cleaning schedule required to achieve £406,000
Tayside Contract approved saving and associated redundancy costs. New cleaning schedule for
offices in place from 1st July 2025. Increased costs due to redundancy and new booking system.
250 Projected overspend due to shortfall in income target for Pullar House lets in the current year due
to delays from public sector partners.
Catering
(289) Projected underspend due to lower meals than budgeted.
LEGAL AND GOVERNANCE
Total (111)
50 Projected non-achievement of slippage target across Legal & Governance
35 Projected overspend on supplies and services
(196) Projected additional income across Legal and Governance (Short Term Lets £84,000,  Licences
£35k, external recharges to Dundee City Council & Angus Council £40k, rebates income on
contracts £25k and additional income due to external work including Council house buy backs
£12k.
CUSTOMER AND DIGITAL SERVICES
Total (662)
IT & Customer Services
(569) Projected under spend on staff costs in excess of slippage target caused by delays in recruiting
and difficulties in sourcing suitably experience / skilled staff for technical IT roles. 
Revenues and Benefits
(30) Projected underspend due to excess staff slippage due to early delivery of savings.
(143) Additional statutory additions income and small underspend on supplies and services
80 Projected shortfall due to increased service charges from Social Housing Providers that are not
covered by Housing Benefit Subsidy.
STRATEGIC PLANNING, PEOPLE AND PERFORMANCE
Total (511)
(280) Projected staff slippage across Strategic Planning, People and Performance in excess of slippage
target
44 Projected overspend on supplies and services
(150) Projected net underspend on the Locality budget to reflect known commitments.
(125) Projected additional income from the salary sacrifice scheme
PROJECTS AND PROGRAMMES
Total 0 0 No material variances at present
FINANCE AND BUSINESS SUPPORT
Total (246)
(246) Projected underspend due to slippage in excess of  target due to turnover and early delivery of
savings.
TOTAL (2,539)
Page 39 of 186

Page 40

Page 40 of 186

Page 41

APPENDIX 3
Perth and Kinross Health and Social Care Partnership (Revised)
Projected outturn based on Revenue Monitoring to 31 December 2025
Social Care Health
Health &
Social Care
Partnership
£'000 £'000 £'000
DEVOLVED FUNCTIONS
Older People Services 1,571 1,889 3,460
Adult Services 2,422 (563) 1,859
Other Community Services (148) 0 (148)
Management/Commissioned/Other 353 (45) 308
Undelivered Savings 115 110 225
Sub Total - Hospital & Community Health 4,313 1,391 5,704
P&K IJB Lead Partner 0 (1,592) (1,592)
Dundee & Angus Hosted Services Recharges In/Out 0 1,991 1,991
Sub Total - Lead Partner Arrangement 0 399 399
Acute / Whole System Pressures 0 (653) (653)
Total Lead Partner Arrangements 0 (254) (254)
GP Prescribing / Other Family Health Services 0 (459) (459)
General Medical Services / Family Health Services 0 396 396
Sub Total - PKHSCP 4,313 1,074 5,387
Approved Use of General Reserves in 2025/26 (164) 0 (164)
Financial Recovery Actions - Part A (250) (700) (950)
Total Projected Outturn Perth & Kinross HSCP 3,899 374 4,273
NON - DEVOLVED FUNCTIONS 0 0 0
TOTAL HEALTH AND SOCIAL CARE 3,899 374 4,273
Projected Out-turn Over /
(Under) Spend
6
Page 41 of 186

Page 42

Page 42 of 186

Page 43

APPENDIX 4
(Revised)
PERTH AND KINROSS COUNCIL - HOUSING REVENUE ACCOUNT 2025/26 PROJECTED OUTTURN
(Based on Expenditure to 31 January 2026)
£'000
Service Wide
100 Projected additional pay award costs across the Housing Revenue Account
(101) Projected slippage across HRA in excess of slippage target
Repairs & Trades
447 Projected overspend on external voids due to use of external contractors.
188 Projected overspend on external repairs & maintenance due to use of external contractors and increased stock levels.
(670) Projected underspend within stores as a result of increased usage of external contractors.
(125) Projected underspend within Electrical Inspection Condition Report (EICR) contract as a result of less remedial works required.
102 Purchase of additional Internet Of Things Sensors for installing in tenant's homes
(190) Projected underspend within planned maintenance
59 Projected overspend on transport costs
90 Projected overspend in relation to Emergency Lighting remedial works
(64) Projected additional income for recoverable charges
89 Housing Repairs - additional staff and fire assessments remedial work to be funded from earmarked reserves.
Improvements
(126) Projected additional Ofgem income for Renewable Heat Incentives
(11) Recharge to HEEPS ABS programme for Project Manager costs
51 Projected overspend in relation to cost of RAAC surveys and architects fees
30 Projected overspend in relation to cost of Energy performance Certificate works
49 Housing Improvements - additional staff to be funded from earmarked reserves.
Housing Localities
78 Projected overspend on non-staff budgets across locaity offices
(70) Projected underspend on Garden Maintenance contract
(110) Projected underspend within energy costs in Sheltered Housing
(35) Projected underspend within non-staff budgets in Sheltered Housing
(20) Projected underspend within Tenant Participation
141 Localities - additional staff to be funded from earmarked reserves..
Specialist Services
0 Localities - additional staff and costs for downsizing scheme to be funded from earmarked reserves.
General Administration
139 Projected overspend on Void Council Tax based on 2024/25 outturn.
773 Projected overspend on loan charges due to acceleration of capital programme including buy backs including paying off some debt
earlier
119 Projected overspend on corporate recharges based on 2024/25 plus 3% due to increasing Council wide costs.
(494) Projected underspend on rent bad debt provision based on estimated rent arrears position.
157 Projected increase in insurance costs
(20) Projected underspend within rates
(100) Projected underspend within void rent loss
Income
(100) Projected additional Interest on Revenue Balances income.
(750) Projected additional income based on stock levels.
CFCR
453 As a result of the projected net under spends highlighted above, this is the additional amount available to support the HRA capital
programme from the Revenue Budget.
(279) Contribution from HRA Earmarked Reserve
(200) Net Projected Underspend to be transferred to Unearmarked Reserves
HRA Reserve Information
1,258 Opening HRA Earmarked Reserve
(279) Total contribution from HRA Earmarked Reserve.
979 Projected Closing HRA Earmarked Reserve
1,000 Opening HRA Unearmarked Reserve
200 Total contribution to HRA Unearmarked Reserve
1,200 HRA Unearmarked Reserve - 3.1%
Summary of Service Variances
6
Page 43 of 186

Page 44

Page 44 of 186

Page 45

APPENDIX 5
(Revised)
Other Grant Funding 2025/26
Children, Families and Justice 
Scottish Government - Caledonian Project £150,000
TOTAL £150,000
Other Grant Funding 2026/27
Strategic Planning, People and Performance
Scottish Government – Fairer Futures Partnership £247,000
TOTAL £247,000
6
Page 45 of 186

Page 46

Page 46 of 186

Page 47

APPENDIX 6
(Revised)
Council Approved Revenue Budget Flexibility
Economy, Development and Planning
Jeanfield Swifts Community FC £100,000
Tactran £109,000
Civic / Events £69,000
Environment and Infrastructure
Good Food Nation £40,000
Housing and Communities
Community Asset Transfer Fund £60,000
Community Transport Funding £10,000
Community Resilience Fund £24,000
Strategic Planning, People and Performance
Pay & Grading review £15,000
Community Mental Health Futures £191,000
Total £618,000
6
Page 47 of 186

Page 48

Page 48 of 186

Page 49

General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments Balance
31/3/25 25/26 26/27 27/28 25/26 Future
£m £m £m £m £m £m £m £m
General Fund Balance 68.284
Balances Held Under Statute / Regulation
- Revenue Grants 13.355 (2.554) (0.170) (10.591) 0.040
- Service Concessions 13.262 (9.000) (2.000) (1.000) (1.262) 0.000
- Council Tax Income for affordable housing 4.796 (0.042) 0.283 0.283 (0.642) (4.678) 0.000
- Developers Contributions: Affordable Housing 4.627 (4.627) 0.000
- Developers Contributions: Commuted Sums 1.202 (1.202) 0.000
- Car Parking 0.977 (0.168) 0.279 (0.380) (0.708) 0.000
- Devolved School Management 0.527 (0.527) 0.000
Sub total 38.746 (12.291) (1.717) (0.717) (0.533) (0.380) (23.068) 0.040
Balances Held for Specific (Previously Approved) Purposes
- Council Approved Revenue Budget Flexibility 1.483 (0.558) (0.694) 0.578 (0.618) 0.191
- Culture 0.499 (0.105) (0.394) 0.000
- School Estate 0.311 (0.058) 0.791 0.347 1.391
- Climate Change 0.295 (0.049) (0.246) 0.000
- Works Maintenance 0.200 (0.020) (0.070) 0.020 (0.020) 0.110
- Modern Apprentice Scheme 0.186 0.186
- School Counsellors 0.151 (0.151) 0.000
- Local Government Elections 0.106 0.053 0.053 (0.212) 0.000
- Events 0.097 (0.097) 0.000
- Cemetery Walls 0.080 (0.076) 0.004
- Salix 0.075 0.075
- Community Investment Fund 0.061 (0.023) (0.024) 0.014
- Historic Child Abuse Scheme 0.050 (0.011) 0.039
- Financial Assistance (Mod) 0.040 0.020 0.020 0.020 (0.041) 0.059
- Local Area Partnerships 0.036 (0.006) 0.030
- Feasibility 0.100 0.027 (0.115) 0.012
Approved
Contributions (from) / to
Reserves
APPENDIX 7
(Revised)
6
Page 49 of 186

Page 50

General Fund Reserves Update
Proposals
Included
in Report
Proposals
Included
in Report
Commit-
ments Balance
31/3/25 25/26 26/27 27/28 25/26 Future
£m £m £m £m £m £m £m £m
Approved
Contributions (from) / to
Reserves
APPENDIX 7
(Revised)
- Health and Social Care 0.000 0.309 0.500 0.809
- pEPR Funding 0.000 0.400 (0.875) (0.356) 0.150 (0.150) 0.831 0.000
- Community Resilience 0.000 0.800 0.800
Sub total 3.770 0.466 (1.054) (0.201) 0.737 (0.829) 0.831 3.720
Balances Held for Other Purposes 0.000
- Transformation & Workforce Management 4.837 (0.831) (0.550) (1.073) 2.383
- Anti - Poverty 1.213 (0.165) (0.678) (0.050) 0.031 (0.031) 0.320
- Communities 1.003 (0.285) (0.081) (0.055) (0.020) 0.562
Sub total 7.053 (1.281) (1.309) (0.105) 0.031 (0.020) (1.104) 3.265
Earmarked Reserves 49.569 (13.106) (4.080) (1.023) 0.235 (1.229) (23.341) 7.025
Uncommitted General Fund Balance 18.715
Use of unearmarked Reserves in setting Budgets (1.989)
Impact of Current Year Decisions (3.974)
Impact of Current Year Projected Outturn 2.501
Impact of proposals within this report 2.227
Updated Unearmarked General Fund Balance 17.480
Percentage of Net Revenue Budget 3.5%
Page 50 of 186

Page 51

Appendix 8
(Revised)
(1) (2) (3) (4) (5) (6)
2026/27 Previously Movements Virements Movements 2026/27
Council Approved in in Revised
Approved Adjustments Funding Reserves Mgt
Budget (Net) Budget
£'000 £'000 £'000 £'000 £'000 £'000
SECTION 1
Service Budgets
Education and Learning 183,228 18 183,246
Children, Families and Justice 27,360 513 27,873
Economy, Development and Planning 15,346 (1) 319 15,664
Environment and Infrastructure 36,238 22 210 36,470
Housing and Communities 18,735 (2) 330 19,063
Property Services 63,962 60 64,022
Legal and Governance 4,618 6 4,624
Customer and Digital Services 12,975 5 12,980
Strategic Planning, People and Performance 6,450 (31) 206 6,625
Projects and Programmes 148 148
Finance and Business Support 10,772 (60) 10,712
Directorate Core Costs 622 622
Sub - Total: Service Budgets 380,454 0 0 530 1,065 382,049
SECTION 2
Corporate Budgets
Health and Social Care 121,185 (530) 120,655
Contribution to Valuation Joint Board 1,490 1,490
Capital Financing Costs 21,403 4,570 25,973
Interest on Revenue Balances (3,408) (549) (3,957)
Net Contribution to/(from) Capital Fund 2,803 (4,021) (1,218)
Contribution to/(from) Insurance Fund 2,000 2,000
Trading Operations Surplus (550) (550)
Support Service External Income (2,403) (2,403)
Tayside Pension Fund 1,711 1,711
Apprenticeship Levy 956 956
Leadership and Procurement (303) (303)
Council Tax Reduction Scheme 7,400 7,400
Discretionary Relief 1,104 1,104
Net Expenditure (General Fund) 533,842 0 0 0 1,065 534,907
PERTH
AND
KINROSS
COUNCIL GENERAL FUND
2026/27 REVENUE
BUDGET - SUMMARY
6
Page 51 of 186

Page 52

Appendix 8
(Revised)
(1) (2) (3) (4) (5) (6)
2026/27 Previously Movements Virements Movements 2026/27
Council Approved in in Revised
Approved Adjustments Funding Reserves Mgt
Budget (Net) Budget
£'000 £'000 £'000 £'000 £'000 £'000
PERTH
AND
KINROSS
COUNCIL GENERAL FUND
2026/27 REVENUE
BUDGET - SUMMARY
SECTION 3
Funding
Revenue Support Grant (314,663) (314,663)
Ring Fenced Grant (3,903) (3,903)
Non Domestic Rate Income (72,299) (72,299)
Council Tax Income (131,650) (131,650)
Capital Grant (1,600) (1,600)
Total Financing (524,115) 0 0 0 0 (524,115)
Financed from/(returned to) Reserves 9,727 0 0 0 1,065 10,792
APPENDIX
8
Page 52 of 186

Page 53

Appendix 9
(Revised)
FINANCIAL RISKS
Risk to Revenue Budget Mitigation
1 Achievement of staff slippage targets, particularly
relating to teacher numbers and impact on pupil /
teacher ratio
- Proactive workforce
management
- Revenue monitoring
- Future budget submissions
2 Funding to Health & Social Care - Proactive management
- Financial Recovery Plan
- Revenue monitoring
- Future budget submissions
3 Inflation in excess of budgeted levels - Revenue monitoring
- Future budget submissions
4 Council Tax income - Revenue monitoring
- Future budget submissions
5 Extended Producer Responsibility for Packaging
income
- Revenue monitoring
- Future budget submissions
6 Cost of responding to Severe Weather - Revenue monitoring
7 Increase in costs due to global tensions - Revenue monitoring
- Future budget submissions
6
Page 53 of 186

Page 54

Page 54 of 186

Page 55

Our vision is a Perth and Kinross where everyone can live life
well, free from poverty and inequality
___________________________________________________________________
Committee: Finance and Resources Committee
Date of Meeting: 22 April 2026
Report Title: Composite Capital Budget 2025/31 and Housing
Investment Programme 2025/30 – Monitoring Report
No.4
Report Number: 26/111
Report Author: John Jennings, Senior Accountant
James Salisbury, Senior Accountant
Organisational Lead: Scott Walker, Chief Finance Officer
___________________________________________________________________
1. Purpose
1.1 This report provides a summary position to date for the 6-year Composite Capital
Budget for 2025/26 to 2030/31 and the 5-year Housing Investment Programme
for 2025/26 to 2029/30 and seeks approval for adjustments to the programmes.
1.2 Sections
1. Purpose
2. Recommendations
3. Background
4. Composite Capital Programme – Gross Capital Resources
5. Composite Capital Programme – Expenditure
6. Housing Investment Programme
7. Budget Overview
8. Financial Risks
9. Impact and Value Assessment
10. Appendices
2. Recommendations
It is recommended that the Committee:
2.1 notes the contents of the report.
2.2 approves the proposed adjustments to the six-year Composite Capital Budget
2025/26 to 2030/31 set out in Sections 4 and 5 of the report and summarised in
Appendices I and II.
7
Page 55 of 186

Page 56

2.3 approves the proposed adjustments to the Housing Investment Programme
Budget 2025/26 to 2029/30 set out in Section 6 of the report and summarised in
Appendix III.
2.4 notes progress with the delivery of major Capital projects as summarised in
Appendix IV.
3. Background
3.1 The Finance and Resources Committee approved an updated six-year gross
Composite Capital Budget for 2025/26 to 2030/31 totalling £561.986 million and
a five-year gross Housing Investment Programme for 2025/26 to 2029/30
totalling £89.027 million at its meeting on 4 February 2026 (report 26/37 refers).
The meeting of the Council on 4 March 2026 (report 26/54 and 26/55 refer,
together with the approved Revenue Budget Motion) subsequently approved
some amendments to the Composite Programme for 2026/27 to 2030/31, giving
a revised gross budget of £573.040 million.
3.2 This monitoring report advises on current year expenditure to 28 February 2026,
and the latest estimate of the projected outturn for each of the years to 2030/31
for the Composite Programme and 2029/30 for the Housing Investment
Programme. The new approved budget for 2031/32 is not included in this report
and will be included as part of the Capital Budget Monitoring reports in 2026/27.
4. Composite Capital Programme – Gross Capital Resources
4.1 As a result of the latest monitoring exercise, further adjustments to the budget
are proposed. The current estimated total gross capital resources (which
includes movements in Capital Receipts, Capital Grants, Contributions and
borrowing) available over the six years 2025/26 to 2030/31 amount to £573.400
million.
4.2 Movements from the revised Composite Capital Budget approved on 4 March
2026 for these six years are summarised in the table below, and the constituent
elements for each year are shown in Appendix I.
Total Gross Composite Capital Resources
Approved
4 Mar 2026
Current
Estimate
Movement
£M £M £M
2025/26 113.526 97.437 (16.089)
2026/27 113.399 127.791 14.392
2027/28 109.013 112.634 3.621
2028/29 86.571 83.712 (2.859)
2029/30 72.729 72.750 0.021
2030/31 77.802 79.076 1.274
Total 573.040 573.400 0.360
Page 56 of 186

Page 57

4.3 The movement in the total Gross Resources for the 6 years 2025/26 to 2030/31
shown at Section 4.2 above can be summarised as follows:
£’000
Reduction in Third Party Contributions (Section 4.4) (0.006)
Increase in Borrowing (Section 4.5 and 4.6) 0.366
Total Increase in Gross Capital Resources (Section 4.2) 0.360
4.4 There is a small overall reduction of £6,000 in Third Party Contributions relating
to the following programmes:
 Active Travel - £90,000 reduction (Section 5.2.2)
 Core Paths - £26,000 reduction (Section 5.3.2)
 Roof Upgrades - £110,000 increase (Section 5.5.4)
4.5 The projected borrowing requirement in 2025/26, which is effectively the
balancing item for resources, is £81.103 million. This is £15.571 million lower
than the amount approved by this Committee on 4 March 2026 (£96.674 million).
4.6 The total borrowing requirement in the subsequent years 2026/27 to 2030/31
has increased by £15.937 million to £364.512 million, resulting in an overall
increase in the level of borrowing across the whole 6-year programme of £0.366
million. This movement in borrowing is summarised as follows:
2025/26 2026/27 2027/28 Later
Years
Total
£m £m £m £m £m
Increase in Environment &
Infrastructure Prudential Borrowing
– Electric Vehicles (Section 5.2.6)
- 0.200 0.200 - 0.400
(Reduction)/Increase in Environment
& Infrastructure Prudential
Borrowing – Recycling in Schools
(Section 5.2.6)
(0.005) (0.059) 0.030 - (0.034)
Increase/(Reduction) in Property
Services – reallocation of
programmes to various projects
(Section 5.5.2)
- 0.500 1.856 (2.356) -
Movements arising from re-phasing
of expenditure and receipts
(Appendix II)
(15.566) 13.254 1.520 0.792 -
Increase/(Reduction) in
Borrowing Requirement
(15.571) 13.895 3.606 (1.564) 0.366
4.7 The chart below shows the Capital Resources required to fund the 2025/26
Composite Capital Programme following the proposed budget adjustments
detailed in this report.
Page 57 of 186

Page 58

5. Composite Capital Programme – Expenditure
5.1 Total Expenditure and Proposed Budget Adjustments to the Current
Programme
5.1.1 Total expenditure (net of grants and contributions) to 28 February 2026 on the
Composite Capital Programme is detailed in Appendix II and summarised as
follows:
Projected
Outturn
(£m)
Net
Expenditure to
28 Feb 2026
(£m)
% of
Projected
Outturn
Environment and Infrastructure 35.629 29.706 83%
Housing and Communities 2.771 2.223 80%
Economy, Development and Planning 22.958 12.840 56%
Property Services 28.011 23.158 83%
Customer and Digital Services 4.129 2.057 50%
Health and Social Care 0.953 0.893 94%
Unallocated 0.000 0.000 0%
Total Net Capital Expenditure 94.451 70.877 75%
5.1.2 Appendix IV includes updates on the progress of delivering the Council’s major
Capital projects.
5.2 Environment and Infrastructure
5.2.1 The Strategic Lead has reviewed the programme for Environment and
Infrastructure and proposes various budget adjustments, the most significant of
which are described below.
5.2.2 Within Traffic and Road Network, for the Active Travel Grant, in line with the
works scheduled for completion in 2025/26, it is proposed £328,000 is moved
Page 58 of 186

Page 59

from 2025/26 to 2026/27. There is a corresponding reduction in the Third-Party
Contribution from Transport Scotland towards these works in 2025/26 of
£90,000. The following rephasings are also proposed within Traffic and Road
Network:
Project 25/26
£m
26/27
£m
27/28
£m
Future
Years
£m
Description
Road Safety
Initiatives
- (0.095) 0.092 0.003 Works for the remainder of the
programme have been reviewed
and rephased with anticipated
spend.
Additional
Road Safety –
Pedestrian
Crossings
(0.124) 0.124 - - Delay to works surrounding project
site resulting in knock on impact to
pedestrian crossing installation.
Traffic Signal
Renewals
(0.070) 0.070 - - Rephasing of budget to align Traffic
Signal works to coincide with
accompanying works which have
been planned for April.
5.2.3 Within Structures, on the Bridge Refurbishment Programme, it is proposed a
total of £1.5 million is drawn down from various years towards Aldour Bridge in
Pitlochry; with £250,000 allocated to both 2026/27 and 2027/28, and £1 million
allocated to 2028/29. Additionally on the Bridge Refurbishment Programme, it is
proposed £90,000 is rephased from 2025/26 to 2026/27 to align with planned
spend to 31 March 2026. Also, within Structures, works at Blairgowrie Bridge will
not commence within the timeframe previously anticipated. Completion is still
expected in 2027/28, however it is proposed a total of £200,000 is moved to
2027/28 from 2025/26 (£175,000) and 2026/27 (£25,000).
5.2.4 Within Flooding, on the Comrie Flood Protection Scheme, the severe wet
weather experienced in January has resulted in minor delays to the overall
project and it is proposed £3.990 million is moved to 2026/27 in line with the
updated schedule of works. The contractor is working to limit the impact on the
completion date, and it is still anticipated the project will complete in late autumn
of this year. Additionally, within Flooding, the Milnathort Flood Protection
Scheme has been scheduled by the contractor to commence construction in
Summer of this year, and it is proposed £308,000 of the budget is rephased
accordingly.
5.2.5 Within Climate Change and Zero Waste, in line with the works due for
completion in 2025/26 on the Climate Change Programme, it is proposed that
£50,000 is moved to 2026/27, with a further £3,000 transferred to the Climate
Change Unallocated budget in 2026/27, with works planned for this year fully
funded.
5.2.6 Within the Prudential Borrowing programme, it is proposed to add a budget of
£200,000 in both 2026/27 and 2027/28 for additional electric vehicles. This
relates to the purchase of 20 new electric pool vehicles over the next two years.
In addition, the following budget adjustments are proposed within the Prudential
Borrowing programme:
Page 59 of 186

Page 60

Project 25/26
£m
26/27
£m
27/28
£m
Description
Wheeled Bin
Replacement
Programme – Domestic
Bins
(0.109) 0.109 - The requirement for replacement bins
in 2025/26 was lower than anticipated
and it is proposed £109,000 of the
budget is moved to 2026/27 to meet
future demand.
Recycling in Schools –
Waste Bin Purchases
(0.005) (0.059) 0.030 The timeframe for delivery of
Recycling in Schools has been
extended into 2027/28. Additionally,
fewer bins require purchased than
previously thought, reducing the
borrowing requirement by £34,000. 
5.2.7 The above proposed adjustments, together with other small movements, have
been reflected in Appendices I and II.
5.3 Housing and Communities
5.3.1 The Strategic Lead has reviewed the programme for Housing and
Communities and proposes the following budget adjustments.
5.3.2 Within Community Greenspace, there have been consultancy delays on the
Core Path Implementation resulting in a £26,000 underspend in 2025/26, this
has also led to a corresponding under recovery of grant of £26,000. The
following rephasings are also proposed within Community Greenspace:
Project 25/26
£m
26/27
£m
27/28
£m
Description
Play Areas and
Parks
Play Areas and
Parks - Third
Party Contribution
(0.241)
0.015
0.241 -
(0.015)
Three projects are ongoing with ground
works scheduled to commence in 2026/27.
It is proposed £241,000 of the budget is
moved to align with the delivery schedule.
The contribution towards Legion Park in
Comrie is not expected until 2027/28 with
the £15,000 income budget moved
respectively.
Crematorium
Access Road
(0.045) 0.045 - In order to minimise the period of
disruption at the crematorium,
improvements to the access road have
been scheduled to take place to coincide
with other works. It is proposed £45,000 is
therefore moved to 2026/27.
5.3.3 Within Improvements, a planning application for the New Gypsy Traveller Site
has been submitted, with the only costs in 2025/26 therefore relating to
architectural and other professional fees, with physical works to commence in
2026/27. It is therefore proposed £1.914 million is moved from 2025/26 to
2026/27.
Page 60 of 186

Page 61

5.3.4 Within Parking, Public Transport Unit and Civil Contingencies, the substantive
work on the three projects in receipt of Bus Infrastructure Funding are scheduled
to commence in 2026/27. It is therefore proposed that the budget of £374,000 is
moved from 2025/26 to 2026/27.
5.3.5 Within Community Learning and Development and Equalities, based on the
application decisions to date for Community-Led Asset Transfers, it is proposed
£68,000 is moved from 2025/26 to 2026/27, with advanced decisions already
committing £43,000 of the budget in 2026/27.
5.3.6 Within Prudential Borrowing Projects, it is proposed £551,000 of the budget for
Kinnoull Street Car Park – Purchase and Upgrade is moved into 2026/27. The
costs incurred during 2025/26 were for the acquisition of the site and fees, with
the refurbishment and upgrade works commencing in 2026/27.
5.3.7 The above adjustments, together with other small movements, have been
reflected in Appendices I and II.
5.4 Economy, Development and Planning
5.4.1 The Strategic Lead has reviewed the programme for Economy, Development
and Planning and proposes the following budget adjustments.
5.4.2 Within Tourism, Culture and Place, there is no expenditure on the City Greening
project while discussions are ongoing regarding the degree of works required. It
is therefore proposed that the budget of £31,000 is moved into 2026/27. 
Additionally, within Tourism, Culture and Place, it is proposed £281,000 of the
budget for Perth and Kinross Lighting Action Plan is moved into 2026/27 in line
with proposed works. As there are no further works planned beyond 2026/27, it
is proposed that the remaining balance of £784,000 is transferred to Unallocated
Resources in 2026/27.
5.4.3 The above proposed adjustments have been reflected in Appendices I and II.
5.5 Property Services
5.5.1 The Strategic Lead has reviewed the programme for Property Services and
proposes various budget adjustments, the most significant of which are
described below.
5.5.2 Within Property Service Management, the Capital Improvement Projects
Programme has been reviewed, and it is proposed £1.106 million is accelerated
from 2028/29 to 2027/28 in line with planned resource requirements.
Additionally, it is proposed a further total of £6.8 million is vired from the Capital
Improvement Projects towards specific projects within Project Support and
Property Service Management. All these proposed movements are summarised
as follows:
Page 61 of 186

Page 62

Project 2026/27
£m
2027/28
£m
2028/29
£m
2029/30
£m
2030/31
£m
Total
£m
Capital Improvement
Projects - 1.106 (5.706) (2.200) - (6.800)
Roof Upgrade
Programme 0.500 0.500 0.500 0.500 0.500 2.500
School Toilet Upgrade
Programme - - 0.500 0.500 0.500 1.500
DDA Adaptation &
Alteration Works
Programme
- - 0.200 0.200 0.200 0.600
Property Compliance
Works Programme - 0.250 0.650 0.650 0.650 2.200
Total 0.500 1.856 (3.856) (0.350) 1.850 0.000
5.5.3 Within Project Support, the following budget adjustments are proposed:
Project 25/26
£m
26/27
£m
Future
Years
£m
Description
Investment in the
Learning Estate
(0.570) 0.570 - Proposed movement of £570,000 due to
re-profiling of the Astro turf refurbishment
at the Community School of Auchterarder
with works due to take place over the
summer holidays.
School Toilet
Upgrade
Programme
0.085 (0.085) - Acceleration of £85,000 following
completion of additional toilet upgrades in
2025/26 compared to the level previously
expected.
North/West Perth –
New Primary
School
(0.306) 0.306 The scope of the project based on
expected pupil numbers and construction
costs were reviewed leading to reduced
design works during 2025/26, with a
corresponding reduction in fees charged
for the year. The design work has
recommenced, and it is proposed
£306,000 is moved from 2025/26 to
2028/29.
Perth Academy
Refurbishment
(0.247) 0.247 - Whilst works are progressing as planned,
the budget phasing has been updated,
and it is proposed £247,000 is moved to
2026/27 in line with expected progress.
Perth Grammar
School – Upgrade
Programme
0.103 (0.103) - Upgrade works at Perth Grammar are
progressing ahead of the initial schedule
and it is proposed £103,000 is accelerated
to cover the advanced spend in 2025/26.
Perth High School
– New School
Investment
(0.699) 0.699 - It was previously reported that Phase 2 for
the demolition of the old Perth High School
was delayed due to additional surveys
being required (Report 26/37 refers).
Following these additional surveys, the
demolition timeline has been altered, and
it is proposed £699,000 is moved to
2026/27 in line with this new timescale.
Page 62 of 186

Page 63

Blairgowrie
Recreation Centre -
Replacement
(0.218) 0.218 - The demolition of the old Blairgowrie
Recreation Centre was delayed, allowing a
period of transition to ensure the
replacement facility was operating as
expected. The proposal to move £218,000
into 2026/27 is in line with the revised
demolition timeframe of Autumn 2026.
Technology
Upgrades
(0.240) 0.240 - Installation of equipment at Blairgowrie
High School has been delayed into
2026/27 and it is proposed £240,000 is
moved accordingly.
Roof Upgrade
Programme
Third-Party
Contribution
(0.125)
(0.110)
0.125
-
0.110
-
The profile of spend on this programme,
following the virement from Capital
Improvement Projects and Third-Party
Contribution, has been reviewed; and it is
proposed £235,000 (after including the
contribution below) is moved from
2025/26 to 2026/27 and 2027/28 in line
with the new profile.
An insurance contribution towards roof
upgrades at Coupar Angus Primary
School, with a corresponding increase to
expenditure budget.
5.5.4 Within Property Service Management, the following budget adjustments are
proposed:
2025/26
£m
2026/27
£m
Future
Years
£m
Description
Friarton Depot –
Waste Transfer
Station
(2.150) 2.150 - The tender for works was issued in
February and the provisional start date for
works is July 2026; as such it is proposed
£2.150 million is moved into 2026/27 in
line with the anticipated start date.
PH2O (0.180) - 0.180 The PH2O project has commenced to the
design stage. The costs incurred in
2025/26 were slightly lower than
anticipated and it is therefore proposed
£180,000 is moved to the end of the
project. More detail is available in
Appendix IV.
Bells Sports
Centre
Redevelopment
(0.284) 0.284 - Design team appointed to begin feasibility
options appraisal for unheated/open multi
use sports pitch / events space. Movement
of £284,000 reflects latest profile of spend.
Perth Concert Hall (0.050) (0.500) 0.550 Additional resource requires to be identified
for various work packages. The proposed
rephasing of £550,000 to 2029/30 aligns
with the current schedule of works.
Perth Museum (0.067) 0.067 - Rephasing of £67,000 allows for final
works anticipated to take place in 2026/27;
with audio visual equipment works
currently ongoing in 2025/26.
Page 63 of 186

Page 64

5.5.5 Within the Property Service Management Prudential Borrowing programme, the
re-purposing of space within Pullar House is moving towards the construction
phase. These works are due to commence in 2026/27 and extend into 2027/28.
It is proposed £900,000 is moved to 2027/28 in line with the updated expenditure
projections.
5.5.6 All the above proposed adjustments, together with other small movements, have
been reflected in Appendices I and II.
5.6 Health and Social Care
5.6.1 Within Occupational Therapy Equipment, in order to improve capacity over the
remainder of the capital programme it is proposed a total of £434,000 is vired
from Technology Enabled Telecare. This impacts all years from 2026/27 and
have been allocated on a basis to ensure consistent budget availability within
both programmes.
5.6.2 All the above proposed adjustments have been reflected in Appendices I and II.
5.7 Unallocated Resources
5.7.1 The proposals outlined in this report in relation to the Unallocated Capital
Resources are summarised in the following table:
2025/26
£m
2026/27
£m
2028/29-
2030/31
£m
TOTAL
£m
Description
Opening Resources - 4.474 - 4.474
Transfers In:
Perth and Kinross
Lighting Action Plan
- 0.784 - 0.784 Section 5.4.2
Transfers Out:
None
Closing Resources - 5.258 - 5.258
5.7.2 After the above movements, the balance of Unallocated Resources is £5.258
million over the 6-year programme. A further £8.684 million is included in
Unallocated Resources in 2031/32.
5.7.3 Should the Unallocated Resources not be required then this will reduce the
amount of borrowing in future years.
6. Housing Investment Programme
6.1 The total current estimated expenditure, net of contributions, for the Housing
Investment Programme over the 5 years 2025/26 to 2029/30 has increased by
£17.775 million to £106.802 million.
6.2 The increase of £17.775 million relates to an increase in the Council Buy-Back
Programme (£14.775 million) between 2026/27 and 2029/30 and the SHQS
Page 64 of 186

Page 65

Future Developments budget (£3 million) in 2026/27, approved by the Housing
and Social Wellbeing Committee at its meeting on 21 January 2026 (report 26/21
refers).
6.3 Movements across years from the previous estimates are summarised in the
table below and detailed in Appendix III.
Approved
4 Feb 2026
Current
Estimate
Movement
£m £m £m
2025/26 46.695 34.429 (12.266)
2026/27      17.321      33.996 16.675
2027/28 12.280 18.256 5.976
2028/29 7.003 10.698 3.695
2029/30 5.728 9.423 3.695
Total 89.027 106.802 17.775
Total Expenditure to 28 February 2026 (Housing Investment Programme)
6.4 Net expenditure for 2025/26 to 28 February 2026 amounts to £29.019 million,
with £18,000 of receipts. Therefore, the borrowing requirement for the year to
date is £29.001 million.
6.5 The Strategic Leads for Housing and Communities and Property Services have
reviewed the Housing Investment Programme and proposed the budget
adjustments outlined below.
6.6 It is proposed to move the balance of the New Build Future Developments
budget in 2025/26 of £3.550 million to various schemes, as summarised in the
following table:
2025/26
£m
2026/27
£m
Total
£m
Balhousie, Perth 0.146 - 0.146 To meet professional fees to date.
Kinloch Brae,
Blairgowrie
(0.011) 0.188 0.177 Purchasing 3 additional units in
2026/27 (£546k), less Scottish
Government Grant (£309k) and
Second Homes Income (£60k).
Beechgrove, Perth (0.161) - (0.161) £159k to meet latest expenditure,
less £320k Commuted Developer
Sums.
Broich Road,
Crieff
(0.033) - (0.033) Additional grant received (£34k), less
£1k expenditure rounding.
Ballinuig, Pitlochry 0.003 - 0.003 Professional fees incurred in
2025/26, with the scheme to be
developed in 2026/27 with further
future drawdown required.
New Build Future
Developments
(3.550) 3.418 (0.132) Balance of budget moved from
2025/26 to 2026/27.
TOTAL (3.606) 3.606 -
6.7 It is also proposed to adjust some budgets between years, reflecting progress
made on the various projects as outlined below:
Page 65 of 186

Page 66

2025/26
£m
2026/27
£m
2027/28
£m
Heating Upgrades (0.109) 0.109 0
Triple Glazing (1.205) 1.205 0
Adaptation (OT) (0.117) 0.117 0
Energy Efficiency (0.124) 0.124 0
Environmental Improvements 0.200 (0.100) (0.100)
Fire Precaution Measures (0.144) 0.144 0
Fire Alarm Replacement (0.046) 0.046 0
Sound Insulation (0.398) 0 0.398
Structural Improvements (1.233) 0 1.233
St. Catherines Redevelopment (0.458) 0.100 0.358
Lockups & Garages (0.050) 0 0.050
Shops & Offices (0.269) 0 0.269
Greyfriars and Satellite Sites (0.073) 0 0.073
Double Dykes Chalet Replacement (0.681) 0.681 0
Upgrade & Replace Lifts (0.034) 0.034 0
ICT Expenditure (0.048) 0.048 0
Mortgage to Rent (0.128) 0.128 0
6.8 There is an estimated underspend of £567,000 on 2025/26 on the Kitchen
Replacement programme in line with the latest projection of works required this
year. It is proposed that this is applied as follows:
 Kitchen Replacement Programme in 2026/27 - £349,000 to cover future
works
 Bathroom replacements - £92,000 to cover installations completed in 2025/26
 Rewiring, Infrastructure and Property - £36,000 to cover remaining works in
2025/26 on voids.
 Controlled Door Entry - £10,000 for installations completed in 2025/26
 HRA Car Parks - £80,000 for work at Market Court and Milne Court in
2025/26
6.9 At its meeting on 21 January 2026, the Housing and Social Wellbeing Committee
also approved reductions in the amount of Capital Financed from Current
Revenue (CFCR) by £1.291 million across the 5-year programme.
Consequently, together with the additional expenditure of £17.775 million
detailed in Section 6.2 (above), total borrowing on the Housing Revenue Account
has increased by £19.066 million across the 5-year programme.
6.10 All the proposed movements outlined above have been included in Appendix III.
7. Budget Overview
7.1 The projected net expenditure outturn in 2025/26 for the Composite Capital
Budget is £94.451 million and represents 65% of the original 2025/26 budget
approved on 30 April 2025 (£146.146 million). The revised budget is based on
the latest projections of expenditure and all budget adjustments outlined within
this report.
7.2 Net expenditure to 28 February 2026 on the Composite Capital Budget is
£70.877 million and represents 75% of the proposed revised budget for 2025/26
of £94.451 million.
Page 66 of 186

Page 67

7.3 The projected net expenditure outturn in 2025/26 for the Housing Investment
Programme is £34.429 million and represents 123% of the original 2025/26
budget approved on 30 April 2025 (£28.098 million). This increase reflects the
allocation of future years block budgets to specific projects in 2025/26 and the
increase in the Council House Buy-Back programme.
7.4 Net expenditure to 28 February 2026 on the Housing Investment Programme is
£29.019 million which represents 84% of the proposed revised budget for
2025/26 of £34.429 million.
7.5 The Council’s total Borrowing Requirement to 28 February 2026, based on the
Composite and Housing Investment Programmes, is £85.689 million.
7.6 The estimated overall Council Borrowing Requirement for 2025/26 as a whole
has reduced by £27.837 million to £113.848 million as a result of the
monitoring adjustments reflected within this report. This reflects a reduction in
estimated borrowing in the current year on the Composite Programme of
£15.571 million and £12.266 million on the Housing Investment Programme
7.7 In the context of the Capital Budget, the borrowing above refers specifically to
the funding of capital expenditure and therefore the need to borrow. The actual
amounts and timing of the borrowing is undertaken as part of the Council’s
Treasury Management operations and reported within the Treasury Activity and
Compliance reports throughout the year.
8. Financial Risks
8.1 In preparing the Council's capital monitoring, officers have considered the key
strategic, operational and financial risks facing the Council over this period.
Whilst the risks may be managed in the current financial year, given the nature
of capital projects these risks are also likely to impact future years plans.
8.2 To alleviate the impact these risks may have if they occur, a number of general
risk mitigation factors are utilised by the Council which include detailed budget
monitoring carried out by Services and having general unallocated funds
available to meet unforeseen expenditure.
8.3 Given the latest monitoring position outlined in this report, the risks to 2025/26
have been removed or reduced. Going forward, risks to future years Capital
Expenditure plans will be monitored with mitigating actions identified. The main
risks impacting the Capital Budget are maintained in Appendix V, which
includes updates to risks for Inflation and Interest Rates following ongoing
conflict in the Middle East.
8.4 These risks are monitored continuously by officers, and any implications on the
Capital Budget will be reported to the Committee at the appropriate time.
9. Impact and Value Assessment
9.1 This is an operational report, and as such, an impact and value assessment in
not required.
Page 67 of 186

Page 68

10. Appendices
Appendix I - Composite Capital Programme - Estimated Capital Resources
2025/26 to 2030/31
Appendix II - Composite Capital Programme - Summary of Capital Resources
and Expenditure 2025/26 to 2030/31       
Appendix III - HRA Capital Investment Programme – Summary of Capital
Resources and Expenditure 2025/26 to 2029/30
Appendix IV - Significant Capital Projects Progress Update
Appendix V - Capital Budget Financial Risks
Page 68 of 186

Page 69

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
Estimated Capital Resources 2024/25 to 2029/30
APPENDIX I
Capital Capital Capital Capital Capital Capital Capital
Resources Resources Resources Resources Resources Resources Resources
2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
Capital Grants
Road Safety Initiaive Fund 530 0 0 0 0 0 530
General Capital Grant 12,438 12,481 21,752 12,750 12,750 12,750 84,921
Total Capital Grants 12,968 12,481 21,752 12,750 12,750 12,750 85,451
General Capital Receipts
General Fund - Capital Receipts 73 497 0 0 0 0 570
General Fund - Ring Fenced Receipts 557 1,594 994 981 1,019 1,000 6,145
Total General Capital Receipts 630 2,091 994 981 1,019 1,000 6,715
Commercial Property Receipts
Capital Receipts brought-forward 1,332 2,614 2,449 3,947 4,577 5,022 1,332
Commercial Property Capital Receipts 619 235 2,398 2,530 645 800 7,227
Capital Receipts carried-forward (2,614) (2,449) (3,947) (4,577) (5,022) (1,922) (1,922)
Total Commercial Property Receipts Applied (663) 400 900 1,900 200 3,900 6,637
Contributions
Tay Cities Deal 0 1,055 3,945 500 956 0 6,456
Developer Contributions 1,500 1,800 2,000 2,000 2,000 2,000 11,300
Other Third Party Contributions 1,712 2,000 3,015 1,000 1,000 2,064 10,791
Revenue Budget Contributions 187 124 124 0 0 0 435
Total Contributions 3,399 4,979 9,084 3,500 3,956 4,064 28,982
Capital Borrowing Requirement 81,103 107,840 79,904 64,581 54,825 57,362 445,615
TOTAL CAPITAL RESOURCES/
GROSS BUDGET EXPENDITURE 97,437 127,791 112,634 83,712 72,750 79,076 573,400
Movements in Resources from Approved Budget - 4 February 2026
Revised Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget Budget Budget Budget
2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
£'000 £'000 £'000 £'000 £'000 £'000 £'000
Increase/(Decrease) in:
Capital Receipts - General Fund (497) 497 0 0 0 0 0
Capital Receipts - Commercial Property 0 0 0 0 0 0 0
Capital Receipts - Ring Fenced 0 0 0 0 0 0 0
Capital Grants:
Road Safety Initiaive Fund 0 0 0 0 0 0 0
General Capital Grant 0 0 0 0 0 0 0
Tay Cities Deal 0 0 0 0 0 0 0
Third Party Contributions (21) 0 15 0 0 0 (6)
Revenue Contributions 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0
Resources b/f 0 0 0 0 0 0 0
Resources c/f to future years 0 0 0 0 0 0 0
Borrowing Requirement (15,571) 13,895 3,606 (2,859) 21 1,274 366
Total Increase/(Decrease) in Resources (16,089) 14,392 3,621 (2,859) 21 1,274 360
Approved Resources 4 February 2026 118,327 133,279 88,795 71,470 68,533 81,582 561,986
Approved Adjustments 4 March 2026 (4,801) (19,880) 20,218 15,101 4,196 (3,780) 11,054
Revised Resources 97,437 127,791 112,634 83,712 72,750 79,076 573,400
7
Page 69 of 186

Page 70

Page 70 of 186

Page 71

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Approved Approved Proposed Revised Actuals Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Report 3 Adjustment Adjustment 28-Feb-26
Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2025/26 2024/25 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE 41,504 0 (5,875) 35,629 29,706 35,629 52,743 28,184 25,783 20,919 17,167 180,425
HOUSING & COMMUNITIES 5,958 0 (3,187) 2,771 2,223 2,771 4,780 2,099 1,558 1,558 1,050 13,816
ECONOMY, DEVELOPMENT & PLANNING 24,054 0 (1,096) 22,958 12,840 22,958 13,246 12,680 10,250 (2,436) 1,186 57,884
PROPERTY SERVICES 33,923 0 (5,912) 28,011 23,158 28,011 40,790 49,120 36,056 42,350 43,027 239,354
CUSTOMER & DIGITAL SERVICES 4,185 (58) 2 4,129 2,057 4,129 4,848 11,104 6,214 6,030 12,256 44,581
HEALTH & SOCIAL CARE 953 0 0 953 893 953 1,353 1,369 1,370 1,354 1,326 7,725
UNALLOCATED CAPITAL RESOURCES 4,743 (4,743) 0 0 0 0 5,258 0 0 0 0 5,258
TOTAL NET EXPENDITURE 115,320 (4,801) (16,068) 94,451 70,877 94,451 123,018 104,556 81,231 69,775 76,012 549,043
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
GENERAL CAPITAL GRANT (12,438) 0 0 (12,438) (12,988) (12,438) (12,481) (21,752) (12,750) (12,750) (12,750) (84,921)
DEVELOPER CONTRIBUTIONS (5,344) 3,844 0 (1,500) 0 (1,500) (1,800) (2,000) (2,000) (2,000) (2,000) (11,300)
CAPITAL RECEIPTS (1,189) 0 497 (692) (253) (692) (732) (2,398) (2,530) (645) (800) (7,797)
ANNUAL BORROWING REQUIREMENT 96,349 (957) (15,571) 79,821 57,636 79,821 108,005 78,406 63,951 54,380 60,462 445,025
CAPITAL RECEIPTS BROUGHT FORWARD (1,332) 0 0 (1,332) (1,332) (1,332) (2,614) (2,449) (3,947) (4,577) (5,022) (1,332)
CAPITAL RECEIPTS CARRIED FORWARD 2,614 0 0 2,614 384 2,614 2,449 3,947 4,577 5,022 1,922 1,922
TOTAL NET BORROWING REQUIREMENT 97,631 (957) (15,571) 81,103 56,688 81,103 107,840 79,904 64,581 54,825 57,362 445,615
7
Page 71 of 186

Page 72

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-26
Report 3 04-Mar-26 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
ENVIRONMENT & INFRASTRUCTURE
Traffic & Road Network
Road Safety Initiatives (20mph Zones etc..) 732 732 212 732 453 453 417 418 418 2,891
Scottish Government Grant (Transport Scotland) (530) (530) (530) 0 0 0 0 0 (530)
Road Safety Initiatives - A94 Safety Improvements 84 84 84 0 0 0 0 0 84
Active Travel Grant -Traffic & Road Safety Schemes 1,823 (418) 1,405 716 1,405 1,138 600 600 600 600 4,943
Third Party Contribution (1,050) 90 (960) (960) 0 0 0 0 0 (960)
20mph Signage Programme 0 0 0 120 0 0 0 0 120
Additional Road Safety - Pedestrian Crossings 246 (124) 122 112 122 277 0 0 0 0 399
Traffic Signal Renewals - Upgrading 200 (70) 130 55 130 270 300 300 100 95 1,195
Investment in Local Footpaths 0 0 0 120 0 0 0 0 120
Car Parking Investment - Pitlochry 7 7 7 7 0 0 0 0 0 7
Revenue Contribution (1) (1) (1) 0 0 0 0 0 (1)
A977 Upgrades 0 0 0 177 0 0 0 0 177
Broich Road, Crieff - Road Realignment & Safety Measures 18 18 18 0 0 0 0 0 18
Sub-Total 1,529 0 (522) 1,007 1,102 1,007 2,555 1,353 1,317 1,118 1,113 8,463
Street Lighting Partnership
Street Lighting 0 0 0 0 0 600 600 600 1,800
Sub-Total 0 0 0 0 0 0 0 0 600 600 600 1,800
Roads Maintenance Partnership
Structural Maintenance 10,257 10,257 8,721 10,257 11,000 11,500 11,851 8,320 9,500 62,428
Third Party Contribution (513) (513) (197) (513) 0 0 0 0 0 (513)
Footways 359 359 313 359 768 768 741 341 400 3,377
Third Party Contribution (2) (2) (2) (2) 0 0 0 0 0 (2)
Perth Flood Protection Scheme (South Inch Culvert Reinstatement) 9 9 9 9 0 0 0 0 0 9
Sub-Total 10,110 0 0 10,110 8,844 10,110 11,768 12,268 12,592 8,661 9,900 65,299
Structures
Bridge Refurbishment Programme 1,682 (349) 1,333 996 1,333 2,552 2,424 2,651 6,200 1,999 17,159
Old Perth Bridge - Strengthening 38 38 24 38 235 2,216 0 0 0 2,489
Perth Queens Bridge - Strengthening 81 81 8 81 179 192 1,850 0 0 2,302
Culteuchar Culvert 5 5 5 5 0 0 0 0 0 5
Garry Viaduct 393 393 266 393 183 1,195 1,755 786 25 4,337
Bolfrack River Retaining Wall 521 521 484 521 0 0 0 0 0 521
Bridge of Tilt 285 285 264 285 965 0 0 0 0 1,250
Corb Bridge Culvert, Kinross 398 398 387 398 0 0 0 0 0 398
Blairgowrie Bridge 200 (175) 25 2 25 150 1,200 0 0 0 1,375
Aldour 0 0 0 250 250 1,000 0 0 1,500
Vehicular Bridge Parapets Programme - Assess & Upgrade 10 10 10 24 0 0 0 0 34
Sub-Total 3,613 0 (524) 3,089 2,436 3,089 4,538 7,477 7,256 6,986 2,024 31,370
Flooding
Comrie Flood Protection Scheme 17,730 (3,990) 13,740 11,362 13,740 17,083 0 0 0 0 30,823
Milnathort Flood Protection Scheme 331 (308) 23 2 23 308 0 0 0 0 331
South Kinross Flood Protection Scheme 480 480 373 480 10,517 3,099 75 0 0 14,171
Flood Mitigation Measures - Dunkeld and Craigie Burn 282 282 186 282 88 153 338 129 0 990
Investment in Surface Water Management Schemes - Leaky Dam, Rattray Burn3 3 3 48 44 255 0 0 350
Coastal Change Adaptation 0 0 0 59 0 0 0 0 59
Almondbank Flood Protection Scheme 0 0 153 0 0 0 0 0 0 0
Sub-Total 18,826 0 (4,298) 14,528 12,076 14,528 28,103 3,296 668 129 0 46,724
Climate Change and Zero Waste
Climate Change Programme 215 (53) 162 42 162 580 200 0 0 0 942
Climate Change Unallocated 329 (329) 0 0 332 0 0 0 0 332
Nature Restoration 199 199 10 199 0 0 0 0 0 199
Sub-Total 743 0 (382) 361 52 361 912 200 0 0 0 1,473
Prudential Borrowing Projects
Climate Change and Zero Waste
Wheeled Bin Replacement Programme - Domestic Bins 279 (109) 170 158 170 309 200 220 220 225 1,344
Wheeled Bin Replacement Programme - Commercial Bins 71 71 48 71 20 20 25 25 25 186
Capital Receipts - Disposals (3) (3) (2) (3) 0 0 0 0 0 (3)
Recycling in Schools - Waste Bin Purchases 18 (5) 13 7 13 25 30 0 0 0 68
Recycling Containers, Oil Banks & Battery Banks Replacement Programme99 99 53 99 163 105 70 70 75 582
Capital Receipts - Disposals (7) (7) (1) (7) 0 0 0 0 0 (7)
Page 72 of 186

Page 73

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-26
Report 3 04-Mar-26 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Litter Bins 8 8 2 8 107 50 55 55 55 330
Direct Services
Vehicle Replacement Programme 5,800 5,800 4,484 5,800 3,751 2,692 3,311 3,394 3,500 22,448
Capital Receipts - Vehicle Disposals (547) (547) (309) (547) (294) (269) (331) (339) (350) (2,130)
Additional Electrical Vehicles (EVs) 0 0 0 200 200 0 0 0 400
Street Lighting Partnership
Street Lighting Renewal - LED & Column Replacement 965 (35) 930 756 930 586 562 0 0 0 2,078
Sub Total 6,683 0 (149) 6,534 5,196 6,534 4,867 3,590 3,350 3,425 3,530 25,296
TOTAL - ENVIRONMENT & INFRASTRUCTURE 41,504 0 (5,875) 35,629 29,706 35,629 52,743 28,184 25,783 20,919 17,167 180,425
HOUSING & COMMUNITIES
Community Greenspace
Community Greenspace Sites 0 0 0 25 894 700 700 250 2,569
Play Areas and Parks 1,039 (241) 798 333 798 1,636 582 500 500 500 4,516
Third Party Contribution (19) 15 (4) (4) 0 (15) 0 0 0 (19)
Revenue Contribution (50) (50) (50) 0 0 0 0 0 (50)
3G Pitch, Blairgowrie 34 (24) 10 10 24 0 0 0 0 34
Countryside Sites 0 0 0 0 139 0 0 0 139
Community Greenspace Bridges 106 106 81 106 0 0 0 0 0 106
Core Path Implementation 92 (26) 66 66 0 0 0 0 0 66
Third Party Contribution (92) 26 (66) (66) 0 0 0 0 0 (66)
Kinnoull Hill 24 24 14 24 0 0 0 0 0 24
Third Party Contribution (16) (16) (16) (16) 0 0 0 0 0 (16)
Crematorium Access Road 50 (45) 5 5 45 0 0 0 0 50
Cemetery Extensions 7 15 22 7 22 143 499 358 358 300 1,680
Sub-Total 1,175 0 (280) 895 419 895 1,873 2,099 1,558 1,558 1,050 9,033
Improvements
New Gypsy Traveller Site 1,942 (1,914) 28 7 28 1,914 0 0 0 0 1,942
Sub Total 1,942 0 (1,914) 28 7 28 1,914 0 0 0 0 1,942
Parking, Public Transport Unit and Civil Contingencies
Community Transport Initiatives 27 27 26 27 0 0 0 0 0 27
Bus Infrastructure Fund Expenditure 374 (374) 0 5 0 374 0 0 0 0 374
Sub-Total 401 0 (374) 27 31 27 374 0 0 0 0 401
Community Learning and Development and Equalities
Community-Led Asset Transfers 75 (68) 7 5 7 68 0 0 0 0 75
Sub-Total 75 0 (68) 7 5 7 68 0 0 0 0 75
Prudential Borrowing Projects
Parking, Public Transport Unit and Civil Contingencies
Community Transport Vehicles 115 115 115 115 0 0 0 0 0 115
Kinnoull Street Car Park - Purchase & Upgrade 2,250 (551) 1,699 1,646 1,699 551 0 0 0 0 2,250
Sub Total 2,365 0 (551) 1,814 1,761 1,814 551 0 0 0 0 2,365
TOTAL - HOUSING & COMMUNITIES 5,958 0 (3,187) 2,771 2,223 2,771 4,780 2,099 1,558 1,558 1,050 13,816
ECONOMY, DEVELOPMENT & PLANNING
Roads Infrastructure
A9/A85 Road Junction Improvements (PTF Phase 1) 14 14 105 14 0 0 0 0 0 14
Destiny Bridge and New Kingsway (PTF Phase 2) 5,785 5,785 2,135 5,785 314 0 0 0 0 6,099
Bertha Park Link Road (PTF Phase 3) 10,598 10,598 8,836 10,598 4,462 0 0 0 0 15,060
Third Party Contribution 0 0 0 0 0 0 0 (1,064) (1,064)
Perth Eco-Innovation Park at Perth West 1,724 1,724 450 1,724 3,921 16,000 10,500 0 0 32,145
Third Party Contributions - Tay Cities Deal 0 0 0 (1,055) (3,945) (500) (956) 0 (6,456)
Other Third Party Contributions 0 0 0 (2,000) (3,000) (1,000) (1,000) (1,000) (8,000)
Capital Receipts - Ring Fenced Land Disposals 0 0 0 (550) (725) (650) (680) (650) (3,255)
Sub-Total 18,121 0 0 18,121 11,526 18,121 0 5,092 8,330 8,350 (2,636) (2,714) 34,543
Page 73 of 186

Page 74

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-26
Report 3 04-Mar-26 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Tourism, Culture and Place
Perth City Improvements (PTF Phase 4) 0 0 0 3,642 0 0 0 0 3,642
City Greening 31 (31) 0 0 31 0 0 0 0 31
Perth & Kinross Lighting Action Plan 1,175 (1,065) 110 107 110 281 0 0 0 0 391
Low Carbon Transport & Active Travel Hub - Broxden EV Chargers 0 0 78 0 0 0 0 0 0 0
Third Party Contribution - Tay Cities Deal 0 0 (45) 0 0 0 0 0 0 0
Adapt Your Property - Vacant Town & City Centre Space 390 390 390 500 500 0 0 0 1,390
Adapt Your Property - Royal Bank Building, South Street, Perth 0 0 0 350 0 0 0 0 350
Glover Street, Perth Masterplan 0 0 0 750 0 0 0 0 750
Less Capital Receipt 0 0 0 (750) 0 0 0 0 (750)
Sub-Total 1,596 0 (1,096) 500 140 500 4,804 500 0 0 0 5,804
Commercial Property Investment Programme
Tourism, Culture and Place
Broxden Drainage Mitigation Works 17 17 21 17 0 0 0 0 0 17
Mercian Buildings, Shore Road, Perth 451 451 713 451 0 0 0 0 0 451
Crioch Business Centre, Crieff 316 316 243 316 0 0 0 0 0 316
Northfield Business Park 2,027 2,027 117 2,027 0 0 0 0 0 2,027
Northfield Business Park (Phase 2) 0 0 0 0 0 800 0 0 800
Northfield Business Park - Site 6 0 0 0 0 1,500 0 0 0 1,500
Plot 4 Kinross West 1,526 1,526 80 1,526 0 0 0 0 0 1,526
Welton Road SBU's, Blairgowrie 0 0 0 200 1,400 0 0 0 1,600
Burnside Street SBU's, Pitlochry 0 0 0 600 0 0 0 0 600
Depot SBU's, Blackford 0 0 0 0 0 0 200 1,400 1,600
SBU's, Inveralmond Road, Perth 0 0 0 900 0 0 0 0 900
Land at South Turfhills Depot, Kinross 0 0 0 0 0 1,100 0 0 1,100
Aldour Business Centre, Pitlochry 0 0 0 0 0 0 0 900 900
Borlich Business Centre, Aberfeldy 0 0 0 0 0 0 0 1,600 1,600
Aberfeldy SBU's 0 0 0 700 0 0 0 0 700
4,337 0 0 4,337 1,174 4,337 2,400 2,900 1,900 200 3,900 15,637
Prudential Borrowing Projects
Tourism, Culture and Place
Land Purchase & Development (Hotel Development) 0 0 0 950 950 0 0 0 1,900
Sub Total 0 0 0 0 0 0 950 950 0 0 0 1,900
TOTAL - ECONOMY, DEVLOPMENT & PLANNING 24,054 0 (1,096) 22,958 12,840 22,958 13,246 12,680 10,250 (2,436) 1,186 57,884
PROPERTY SERVICES
Project Support
Investment in the Learning Estate 1,900 (570) 1,330 1,068 1,330 3,076 6,823 0 0 0 11,229
Braco Primary School Upgrade 150 150 17 150 350 3,000 5,000 0 0 8,500
School Toilet Upgrade Programme 600 85 685 465 685 515 600 500 500 500 3,300
Methven Primary School Refurbishment 700 700 514 700 2,970 0 0 0 0 3,670
North/West Perth - New Primary School 341 (306) 35 35 7,672 15,400 306 0 0 23,413
Perth Academy - Refurbishment 1,621 (247) 1,374 1,149 1,374 296 0 0 0 0 1,670
Perth Grammar School - Upgrade Programme Phase 3 600 103 703 599 703 1,525 819 0 0 0 3,047
Perth High School - New School Investment 11,718 (699) 11,019 9,984 11,019 5,599 0 0 0 0 16,618
Pitlochry High School Extension (Pitlochry Leisure Review) 200 46 246 133 246 704 5,000 2,750 0 0 8,700
Blairgowrie Recreation Centre - Replacement 832 (218) 614 590 614 1,918 0 0 0 0 2,532
Technology Upgrades 250 (240) 10 5 10 723 519 0 0 0 1,252
Community School of Auchterarder (FSM) 0 0 0 250 750 2,511 0 0 3,511
Community Campus Access Adaptations 25 25 16 25 0 0 0 0 0 25
Roof Upgrade Programme 500 (125) 375 170 375 625 610 500 500 500 3,110
Third Party Contribution 0 (110) (110) (110) 0 0 0 0 0 (110)
Sub-Total 19,437 0 (2,281) 17,156 14,710 17,156 26,223 33,521 11,567 1,000 1,000 90,467
Property Service Management
DDA Adaptation & Alteration Works Programme 250 250 149 250 303 200 200 200 200 1,353
Property Compliance Works Programme 609 609 477 609 650 650 650 650 650 3,859
Capital Improvement Projects Programme 1,866 1,866 883 1,866 1,800 2,000 4,294 5,500 11,000 26,460
Pitlochry High School - Upgrade Programme 20 20 7 20 0 0 0 0 0 20
Friarton Depot - Waste Transfer Station 2,300 (2,150) 150 78 150 2,371 0 0 0 0 2,521
Energy Efficiency Works - Various Properties 12 12 12 12 0 0 0 0 0 12
Revenue Contribution (Salix Reserve) (12) (12) (12) 0 0 0 0 0 (12)
Page 74 of 186

Page 75

PERTH AND KINROSS COUNCIL
COMPOSITE CAPITAL PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2024/25 to 2029/30
APPENDIX II
Revised Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget Budget
Adjustment Adjustment 28-Feb-26
Report 3 04-Mar-26 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL
(£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000) (£'000)
Letham Community Wellbeing Hub 338 338 323 338 0 0 0 0 0 338
PH2O 300 (180) 120 32 120 1,700 2,000 10,000 30,000 30,027 73,847
Bells Sport Centre 414 (284) 130 59 130 1,784 1,500 3,500 3,000 0 9,914
Kinross Community Campus Sports Facilities 0 0 0 900 5,000 1,000 0 0 6,900
Crieff Community Campus Sports Facilities 0 0 0 0 1,000 4,000 1,300 0 6,300
Crieff Drummond Arms - Regeneration 750 750 645 750 2,192 0 0 0 0 2,942
Perth Concert Hall 200 (50) 150 118 150 500 1,000 695 550 0 2,895
Perth Museum 113 (67) 46 23 46 67 0 0 0 0 113
Sub-Total 7,160 0 (2,731) 4,429 2,806 4,429 12,267 13,350 24,339 41,200 41,877 137,462
Prudential Borrowing Projects
Decarbonisation 178 178 31 178 350 0 0 0 0 528
Energy Conservation & Carbon Reduction Programme 189 189 162 189 150 150 150 150 150 939
Third Party Contribution (41) (41) (41) 0 0 0 0 0 (41)
Pullar House - Purchase & Re-Purposing 7,000 (900) 6,100 5,449 6,100 1,800 2,099 0 0 0 9,999
Sub-Total 7,326 0 (900) 6,426 5,642 6,426 2,300 2,249 150 150 150 11,425
TOTAL - PROPERTY SERVICES 33,923 0 (5,912) 28,011 23,158 28,011 40,790 49,120 36,056 42,350 43,027 239,354
CUSTOMER & DIGITAL SERVICES
ICT Infrastructure Replacement and Upgrade Programme 2,079 2,079 1,691 2,079 2,987 8,666 3,940 3,550 9,487 30,709
Data & Analytics 733 (58) 675 57 675 718 850 900 804 845 4,792
Supporting Digital 681 681 54 681 966 1,106 1,063 1,230 1,085 6,131
Software Licences (Revenues & Benefits) 50 2 52 52 52 78 82 85 87 90 474
School Audio-Visual (AV) Equipment Replacement Programme 27 27 30 27 26 27 226 359 749 1,414
Mosaic - Swift Social Work System Replacement 659 659 217 659 197 497 0 0 0 1,353
Revenue Contribution (124) (124) (124) (124) (124) (124) 0 0 0 (372)
Case Management System 80 80 80 80 0 0 0 0 0 80
TOTAL - CUSTOMER & DIGITAL SERVICES 4,185 (58) 2 4,129 2,057 4,129 4,848 11,104 6,214 6,030 12,256 44,581
HEALTH & SOCIAL CARE
Occupational Therapy Equipment 250 250 250 250 300 300 300 284 256 1,690
Technology Enabled Telecare 650 650 616 650 1,000 1,000 1,000 1,000 1,000 5,650
Software Licences 53 53 27 53 53 69 70 70 70 385
TOTAL - HEALTH & SOCIAL CARE 953 0 0 953 893 953 1,353 1,369 1,370 1,354 1,326 7,725
Unallocated Capital Resources 4,743 (4,743) 0 0 5,258 0 0 0 0 5,258
TOTAL COMPOSITE NET EXPENDITURE 115,320 (4,801) (16,068) 94,451 70,877 94,451 123,018 104,556 81,231 69,775 76,012 549,043
(NET OF GRANTS, REVENUE AND 3RD PARTY CONTRIBUTIONS, AND RING FENCED RECEIPTS)
CAPITAL INCOME & RECEIPTS
General Capital Grant - Scottish Government (12,438) (12,438) (12,988) (12,438) (12,481) (21,752) (12,750) (12,750) (12,750) (84,921)
Developer Contributions (5,344) 3,844 (1,500) (1,500) (1,800) (2,000) (2,000) (2,000) (2,000) (11,300)
General Fund - Capital Receipts/Disposal (570) 497 (73) (27) (73) (497) 0 0 0 0 (570)
Commercial Property - Capital Receipts/Disposal (619) 0 (619) (226) (619) (235) (2,398) (2,530) (645) (800) (7,227)
Total: Capital Receipts (18,971) 3,844 497 (14,630) (13,241) (14,630) (15,013) (26,150) (17,280) (15,395) (15,550) (104,018)
Annual Composite Borrowing Requirement 96,349 (957) (15,571) 79,821 57,636 79,821 108,005 78,406 63,951 54,380 60,462 445,025
CAPITAL RECEIPTS BROUGHT FORWARD (1,332) 0 (1,332) (1,332) (1,332) (2,614) (2,449) (3,947) (4,577) (5,022) (1,332)
CAPITAL RECEIPTS CARRIED FORWARD 2,614 0 0 2,614 384 2,614 2,449 3,947 4,577 5,022 1,922 1,922
TOTAL NET COMPOSITE BORROWING REQUIREMENT 97,631 (957) (15,571) 81,103 56,688 81,103 107,840 79,904 64,581 54,825 57,362 445,615
Page 75 of 186

Page 76

Project Project Description
Traffic & Road Network
Road Safety Initiatives (20mph Zones etc.) A programme of works to improve road safety
Road Safety Initiatives - A94 Safety Improvements A programme of works to improve road safety on the A94
Active Travel Grant - Traffic & Road Safety Schemes A programme of works to improve active travel
20mph Signage Programme A programme of works to introduce 20mph speed limits.
Schools Road Safety Measures A programme of works to improve road safety in the
vicinity of schools
Additional Road Safety - Pedestrian Crossings A programme of works to provide pedestrian crossing
facilities
Traffic Signal Renewals - Upgrading A programme of works to upgrade existing traffic signal
infrastructure
Investment in Local Footpaths A programme of works to improve and provide local
footpaths
Car Parking Investment - Pitlochry Purchase of land and construction of a public car park
A977 Upgrades A programme of works to improve road safety along the
A977.
Broich Road, Crieff - Road Realignment & Safety
Measures
Realignment of Broich Road, Burrell Street and Gallowhill
Junction
Street Lighting Partnership
Street Lighting Replacement of existing street lighting lanterns, columns
and cable network.
Roads Maintenance Partnership
Structural Maintenance
Road maintenance to extend the life of roads, including
predominately road resurfacing, surface dressings,
installing new drainage infrastructure and repairs to and
replacement of defective embankments and retaining
walls
Footways Replacement of existing  deteriorated footway surfaces
Perth Flood Protection Scheme (South Inch Culvert
Reinstatement)
Ground investigation and monitoring then design project
to refurbish existing culvert
Road Safety Barriers
Renewal of existing barriers where unrecoverable
damage has occurred and renewal of barriers where
timber posts have been used in construction
Bridges
Bridge Refurbishment Programme
Used to appoint specialist external inspection teams and
consultants to carry out specialist access bridge
inspections and assessments
Old Perth Bridge - Strengthening Carry out works recommended by the 2018 Bridge
Assessment study, including a range of assessment,
investigation, strengthening and improvement works
Perth Queens Bridge - Strengthening Carry out works recommended by the 2018 Bridge
Assessment study, including a range of assessment,
investigation, strengthening and improvement works
Culteuchar Culvert Replace existing temporary steel bridge (on hire) with
culvert
ENVIRONMENT & INFRASTRUCTURE
Page 76 of 186

Page 77

Project Project Description
Garry Viaduct
Replacement of Bearings and Parapets; including
strengthening of deck for bearing replacement jacking up,
and to cater for increased parapet vehicular deterrent
capacity
Bolfrack River Retaining Wall Replacement of failed section of retaining wall supporting
A827 adjacent to River Tay
Bridge of Tilt Repairs to masonry bridge and installation of major scour
mitigation measures
Corb Bridge Culvert, Kinross Installation of structural lining to dilapidated culvert
Blairgowrie Bridge Major scour mitigation scheme
Aldour
Vehicular Bridge Parapets Programme - Assess &
Upgrade
Assessment and Upgrading of Vehicle Parapets
Programme
Flooding
Comrie Flood Protection Scheme Design and construction of a scheme to reduce the risk of
flooding in Comrie
Milnathort Flood Protection Scheme Design and construction of a scheme to reduce the risk of
flooding in Milnathort
South Kinross Flood Protection Scheme Design and construction of a scheme to reduce the risk of
flooding in South Kinross
Flood Mitigation Measures - Dunkeld and Craigie Burn Design and construction of schemes to reduce the risk of
flooding in Dunkeld and Craigie Burn
Investment in Surface Water Management Schemes -
Leaky Dam, Rattray Burn
Design and construction of a natural flood management
measure (Leaky Dam) to reduce the risk of flooding in
Rattray
Coastal Change Adaptation Design and construct projects to deal with incidents of
coastal erosion
Climate Change and Zero Waste
Climate Change Programme
A programme of projects to meet the priorities to deliver
the Top and High Priority Projects in the Council's Climate
Change Strategy and Action Plan. Proposed projects will
be scrutinised by the Council's Climate Change and
Sustainabliltiy Group
Nature Restoration Protection and restoration of biodiversity focusing on over-
exploitation of the natural environment and addressing its
consequences; habitat loss and fragmentation; and
invasive non-native species.
Prudential Borrowing Projects
Wheeled Bin Replacement Programme - Domestic Bins Replacement of damaged and end of life wheeled bins for
households. Also suppling bins for new properties
Wheeled Bin Replacement Programme - Commercial
Bins
Replacement of damaged and end of life wheeled bins for
commercial customers. Also suppling bins for new
customers and changes to collection contracts
Recycling in Schools - Waste Bin Purchases This project will improve the recycling infrastructure in
PKC learning establishments and will improve positive
behaviours with staff and pupils.
Page 77 of 186

Page 78

Project Project Description
Recycling Containers, Oil Banks & Battery Banks
Replacement Programme
Replacement of damaged and end of life oil and battery
banks
Litter Bins Replacement of damaged and end of life litter bins and/or
for general supply of litter bins where required.
Vehicle Replacement Programme Fleet vehicle replacement programme
Additional Electrical Vehicles (EVs) Purchase of 20 additional electrically powered pool
vehicles
Street Lighting Renewal - LED & Column Replacement Street Lighting LED conversion and column replacement
programme
Community Greenspace
Community Greenspace Sites Main fund for all Community Greenspace Sites which is
drawn down to support the overall capital programme of
refurbishments and upgrades
Play Areas and Parks
Refurbishment of 'Settlement and Neighbourhood'
classification parks working in partnership with
communities to improve, update and renew worn out or
obsolete infrastructure.  Small budget to facilitate
refurbishment of former Premier Park upgrades
3G Pitch, Blairgowrie Two phase community led project to provide a new full
sized 3G football pitch and pavilion
Countryside Sites Refurbishment of more natural parks and open spaces
Community Greenspace Bridges Refurbishment programme for all bridges on Community
Greenspace sites
Core Path Implementation Holding budget for Crieff Comrie Core path development
mainly funded through Sustrans
Kinnoull Hill Complete
Crematorium Access Road
Cemetery Extensions
Funding to allow the extension of existing or development
of new cemeteries to address the pressure for burial
space
Improvements
New Gypsy Traveller Site Feasibility Study for Gypsy Traveller Transient Site
Parking, Public Transport Unit and Civil Contingencies
Community Transport Initiatives
Purchase of vehicles and charging infrastructure for
community transport/resilience groups to use to deliver on
unmet need in the local area.
Bus Infrastructure Fund Improving the infrastructure needed to operate buses
Community Learning and Development and Equalities
Community-Led Asset Transfers
Financial assistance for community groups wishing to
take on PKC assets using the community asset transfer
process
Prudential Borrowing Projects
Community Transport Vehicles Providing vehicles to community transport groups
HOUSING & COMMUNITIES
Page 78 of 186

Page 79

Project Project Description
Kinnoull Street Car Park - Purchase
Purchase of Kinnoull Street Multi-Storey Car Park to
increase Perth and Kinross Council car parking capacity
to support delivery of the Perth City Integrated Investment
Proposal
Roads Infrastructure
A9/A85 Road Junction Improvements (PTF Phase 1)
New infrastructure including a new A9 overbridge, a
bridge over the River Almond and road linking the A85 to
Inveralmond and Bertha Park (Phase 1 of Perth Transport
Futures Project)
Destiny Bridge and New Kingsway (PTF Phase 2) New road and major structure over the River Tay, linking
the A9 north of Inveralmond and the A94 north of Scone
(Phase 2 of Perth Transport Futures Project)
Bertha Park Link Road (PTF Phase 3)
Phase 3 of Perth Transport Futures Project which is a
new link road (1.4km) running through Bertha Park,
connecting Phases 1 and 2.
Perth Eco-Innovation Park at Perth West
Provision of enabling infrastructure (access road, A9
underpass and unit platforms) to develop 25ha of
employment land supporting clean growth, business
innovation and jobs - Phase 1 (11ha).
Tourism, Culture and Place
Perth City Improvements (PTF Phase 4)
Design and development of sustainable transport
corridors to improve access to and from Perth and enable
additional development and improvement within Perth city
centre
Perth City Centre Golden Route (Rail Station)
Design and development of improvements to access,
signage and animation from rail and bus station to Perth
city centre to complement improvements to integration of
transport
City Greening Improvements to support enhancement of retail trading
environment and residential areas and enhanced use of
space for markets, events and alfresco use
Perth & Kinross Lighting Action Plan
Architectural and creative lighting to enhance city and
towns appearance, reduce energy cost and increase
safety at nighttime to increase dwell time, support the
hospitality sector, events and grow the evening economy
Low Carbon Transport & Active Travel Hub - Broxden EV
Chargers
Provision of fast EV chargers combined with solar power
generation and battery storage at Broxden Park & Ride -
Near completion
Adapt Your Property - Vacant Town & City Centre Space
Adapt Your Property supports capital adaptation works to
empty and underused commercial property in city & town
centres, looking at adaptation to attract new commercial,
community or residential use.
Adapt Your Property - Royal Bank Building, South Street,
Perth
Glover Street, Perth Masterplan
ECONOMY, DEVELOPMENT & PLANNING
Page 79 of 186

Page 80

Project Project Description
Commercial Property Investment Programme
Capital investment in economic development in serviced
units and land
Prudential Borrowing Project
Land Purchase & Development (Hotel Development)
This scheme involves the redevelopment of 1-5 High
Street as serviced apartments courtesy of a heritage
grant funding award that includes disposal to a developer
subject to conclusion of a development agreement
Project Support
Investment in the Learning Estate Investment to upgrade the infrastructure and environment
of our existing school estate
Braco Primary School Upgrade Replacement school on adjacent land
School Toilet Upgrade Programme Major toilet upgrades in various schools
Methven Primary School Refurbishment Upgrade of Methven Primary School facilities including
new dining and gym hall
North/West Perth - New Primary School New primary school located at Bertha Park
Riverside Primary New School Replacement of North Muirton and Balhousie primary
schools
Perth Academy - Refurbishment
Investment to upgrade the infrastructure and environment
of the Perth Academy including structural work to sports
block, lighting upgrades, classroom upgrades and
science block cladding
Perth Grammar School - Upgrade Programme Phase 3
Investment to upgrade the infrastructure and environment
of the Perth Grammar School including structural work to
assembly hall, AV and WiFi upgrades, classroom
refurbishment and door upgrades
Perth High School - New School Investment
Replacement of the existing Perth High School
Pitlochry High School Extension (Pitlochry Leisure
Review) Creation of community campus including sports facilities
including 4 court sports hall and associated works
Harris Academy/Invergowrie - Extension
Extension and reconfiguration of existing space at Harris
Academy in Dundee for continuation of access for pupils
based in Invergowrie
Blairgowrie Recreation Centre - Replacement Replacement of the Recreation Centre in Blairgowrie
Technology Upgrades Upgrade to practical teaching environment within the
existing school estate
Community School of Auchterarder (FSM) Upgrading kitchen and dining facilities to provide the
enhanced Free School Meals programme
Community Campus Access Adaptations To support adaptations in schools and community
campuses to help facilitate increased community access
Roof Upgrade Programme
Property Service Management
DDA Adaptation & Alteration Works Programme To provide unhindered accessibility to all Council
Buildings - e.g. Ramps/Lifts/Door Access/Accessible
Toilets and Changing Areas
PROPERTY SERVICES
Page 80 of 186

Page 81

Project Project Description
Property Compliance Works Programme
To ensure compliance with current and changing
legislation including - New Fire Alarms; Lighting; Wiring;
Fire Protection Works; Gas pipework within buildings and
Roof Restraint safety systems
Capital Improvement Projects Programme
Roof Upgrades; Full internal refurbishment works; New
Heating Systems; Boilers and pipework; Structural
Upgrades; Small extensions; New Windows/Doors; New
Fencing; New Cladding
Pitlochry High School - Upgrade Programme
Upgrades to Mechanical and Electrical Infrastructure,
including rewiring, heating and controls systems,
replacement lighting and consequential building works
such as new ceilings, painting and flooring
Friarton Depot - Waste Transfer Station
This project aims to refurbish the main waste transfer
station building to provide a safe environment for workers.
The project will involve a complete re-cladding of the
existing structure, new doors and new services
installation. Some initial enabling work are being carried
out currently.
Energy Efficiency Works - Various Properties Focusing on a spend to save with projects aiming to
reduce energy cost across the property estate
Letham Community Wellbeing Hub Complete
PH2O Replacement of Perth Leisure Pool and Dewars Ice Rink.
Bells Sport Centre Development of Bells' as an unheated, covered sports
pitch and events space
Kinross Community Campus Sports Facilities Improvements to the building fabric and energy efficiency
of Live Active Loch Leven
Crieff Community Campus Sports Facilities Improvements to the building fabric and energy efficiency
of Strathearn Community Campus Leisure Facilities
Crieff Drummond Arms - Regeneration Demolition of former hotel, regeneration of site for
housing use
Perth Concert Hall Roof and plant upgrades and compliance works
Perth Museum Redevelopment of former Perth City Hall to New Perth
Museum
Prudential Borrowing Projects
Decarbonisation This budget will support PKCs path to NetZero and focus
primarily on the de-carbonisation of heat and replacing
inefficient direct emissions heat sources
Energy Conservation & Carbon Reduction Programme
This budget is focused on works to reduce PKC energy
consumption and help achieve annual KPI energy
reduction of 3%
Pullar House - Purchase & Re-Purposing Purchase and development of Pullar House to create a
shared Public Sector Hub
Customer & Digital Services
Page 81 of 186

Page 82

Project Project Description
ICT Infrastructure & Replacement and Upgrade
Programme
This Programme delivers the IT / digital environment,
digital resources and systems required by staff and young
people. The programme maintains, supports and
develops computers; networks; telephony; Microsoft
systems; connectivity and equipment; datacentres;
servers; file storage and back up; security systems and
video conferencing
Data & Analytics
Delivers the governance, tools, technologies and
organisation-wide skills required for optimising value from
Council data, driving informed decision making around
resources, priorities and service delivery targets
Supporting Digital
Develops the capabilities we need to be an innovative
digital organisation.  Including developing the Council’s
corporate employee (mobile working) and customer
(online services) platforms, to create new digital products
and services; investment in tools such as Microsoft;
resourcing innovation and building digital skills, insight
and expertise
Software Licences (Revenues & Benefits) NAC Live system licensing for Revenues & Benefits team
School Audio-Visual (AV) Equipment Replacement
Programme
Ensures all Perth and Kinross classrooms have equitable
access to audio visual panels and the digital skills to
exploit these resources for learning and teaching
Mosaic - Swift Social Work System Replacement Purchase and Development of a new Social Work system
to replace SWIFT
Hardware Funding of additional or bespoke IT Hardware for
Communities Staff
Licenses Funding of software contracts
Case Management System New system for management of client cases
Occupational Therapy Equipment
Supply and install of occupational therapy equipment
following referral from health and social care
professionals.
Technology Enabled Telecare
Replacement of existing analogue Community Alarm
devices to digital alarm units prior to UK switch-off of
analogue network, as well as ongoing rolling replacement
programme.
Moving & Handling Office Refurbishment Relocate staff base, currently under review
Software Licences Various licences for essential social care systems
HEALTH & SOCIAL CARE
Page 82 of 186

Page 83

APPENDIX III
Approved Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Report 3 Adjustment Adjustment 28-Feb-26
21-Jan-26 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
£'000 (£'000) £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
Council House New Build Programme
Beechgrove, Perth 111 159 270 239 270 0 0 0 0 270   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Commuted Developer Sums 0 (320) (320) (320) (320) 0 0 0 0 (320)
Scottish Government Subsidy 0 0 0 0 0 0 0 0
111 0 (161) (50) (81) (50) 0 0 0 0 (50)
Balhousie, Perth 188 146 334 315 334 0 0 0 0 334   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
188 0 146 334 315 334 0 0 0 0 334
Kinloch Gardens, Rattray (20 units) 1,417 1,417 1,417 1,417 0 0 0 0 1,417   
Council Tax (Second Income) (400) (400) (400) (400) 0 0 0 0 (400)
Scottish Government Subsidy 0 0 0 0 0 0 0 0
1,017 0 0 1,017 1,017 1,017 0 0 0 0 1,017
Kinloch Brae, Blairgowrie (4 units) 783 783 781 783 546 0 0 0 1,329   
Council Tax (Second Income) (80) (80) (80) (80) (60) 0 0 0 (140)
Scottish Government Subsidy (404) (11) (415) (415) (415) (298) 0 0 0 (713)
Communted sums 0 0 0 0 0 0 0 0
299 0 (11) 288 286 288 188 0 0 0 476
Broich Road, Crieff (12 units) 2,716 1 2,717 2,716 2,717 0 0 0 0 2,717   
Council Tax (Second Income) (240) (240) (240) (240) 0 0 0 0 (240)
Scottish Government Subsidy (1,242) (34) (1,276) (1,276) (1,276) 0 0 0 0 (1,276)
1,234 0 (33) 1,201 1,200 1,201 0 0 0 0 1,201
Ballinuig 0 3 3 3 0 0 0 0 3   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
0 0 3 3 0 3 0 0 0 0 3
Future Developments 3,550 (3,550) 0 0 8,918 5,596 4,725 4,423 23,662   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
3,550 0 (3,550) 0 0 0 8,918 5,596 4,725 4,423 23,662
Total Council House New Build 6,399 0 (3,606) 2,793 2,737 2,793 9,106 5,596 4,725 4,423 26,643
Increase in Council House Stock
Council House Buy-Backs 15,810 (903) 14,907 13,178 14,907 7,863 5,000 5,000 5,000 37,770   
Scottish Government Subsidy (2,450) (1,960) (4,410) (3,675) (4,410) 0 0 0 0 (4,410)
13,360 0 (2,863) 10,497 9,503 10,497 7,863 5,000 5,000 5,000 33,360
National Trust Scotland (NTS), Dunkeld
Purchase of properties (20 units) 966 (531) 435 435 435 531 0 0 0 966   
Council Tax (Second Income) 0 0 0 0 0 0 0 0   
Scottish Government Subsidy 0 0 0 0 0 0 0 0
966 0 (531) 435 435 435 531 0 0 0 966
Total Increase in Council House stock 14,326 0 (3,394) 10,932 9,938 10,932 8,394 5,000 5,000 5,000 34,326
Standard Delivery Plan
Heating Upgrade Contract Works 1,492 (109) 1,383 877 1,383 920 0 0 0 2,303
Rewiring, Infrastructure & Property Refurbishment 1,339 36 1,375 1,320 1,375 0 0 0 0 1,375
Triple Glazing 4,025 (1,205) 2,820 2,208 2,820 5,230 0 0 0 8,050
Controlled Door Entry 56 17 73 44 73 0 0 0 0 73 
- less Third Party Contribution (7) (7) (14) (14) 0 0 0 0 (14)
Kitchen Modernisation Programme 2,242 (567) 1,675 1,497 1,675 349 0 0 0 2,024
Bathroom Modernisation Programme 1,000 92 1,092 993 1,092 0 0 0 0 1,092
Adaptations (OT) 637 (117) 520 398 520 117 0 0 0 637
HRA CAPITAL INVESTMENT PROGRAMME
SUMMARY OF CAPITAL RESOURCES AND EXPENDITURE 2025/26 to 2029/30
PERTH AND KINROSS COUNCIL
7
Page 83 of 186

Page 84

APPENDIX III
Approved Approved Proposed Revised Actual Projected Revised Revised Revised Revised Revised
Budget Budget Budget Budget to Outturn Budget Budget Budget Budget Budget
Report 3 Adjustment Adjustment 28-Feb-26
21-Jan-26 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4 Report 4
2025/26 2025/26 2025/26 2025/26 2025/26 2025/26 2026/27 2027/28 2028/29 2029/30 TOTAL
£'000 (£'000) £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
External Fabric 2,100 2,100 1,750 2,100 1,744 863 0 0 4,707 
- less Third Party Contribution (69) (69) (32) (69) 0 0 0 0 (69)
Energy Efficiency 724 (124) 600 600 600 124 0 0 0 724 
- less Scottish Government Grant (33) (33) (33) 0 0 0 0 (33)
Multi Storey Flats 4,298 4,298 2,640 4,298 2,273 0 0 0 6,571 
- less Third Party Contribution 0 0 0 (481) 0 0 0 (481)
- less Scottish Government Grant (67) (67) (67) 0 0 0 0 (67)
Environmental Improvements 959 200 1,159 938 1,159 873 873 973 0 3,878
Fire Precaution Measures 388 (144) 244 93 244 1,144 735 0 0 2,123
Fire Alarm Replacement Programme 84 (46) 38 38 212 0 0 0 250
Sound Insulation 408 (398) 10 10 10 0 398 0 0 408
Structural Improvements 1,233 (1,233) 0 0 0 1,233 0 0 1,233
Retrofit Works 162 162 152 162 0 0 0 0 162
SHQS Future Developments 0 0 0 3,000 0 0 0 3,000
Total Standard Delivery Plan 20,971 0 (3,605) 17,366 13,488 17,366 15,505 4,102 973 0 37,946
Other Investment in Council House Stock
Total Major Adaptations to Council House Stock 270 270 232 270 0 0 0 0 270
Rannoch Road, Perth - Housing Regeneration 85 85 78 85 0 0 0 0 85
149-151 Dunkeld Road, Perth 2 2 1 2 0 0 0 0 2
St.Catherine's Square Redevelopment 500 (458) 42 36 42 100 3,166 0 0 3,308
HRA Car Parks 0 80 80 80 0 0 0 0 80
Lock-ups and Garage Sites 50 (50) 0 0 0 50 0 0 50
Shops & Offices 269 (269) 0 0 0 269 0 0 269
Greyfriars and Satellite Sites 73 (73) 0 0 0 73 0 0 73
Double Dykes Chalet Replacement 4,815 (681) 4,134 3,884 4,134 681 0 0 0 4,815 
- Scottish Government Grant (1,690) (1,690) (1,690) (1,690) 0 0 0 0 (1,690)
General Capital Works 56 56 47 56 0 0 0 0 56
Upgrade and Replacements to Lifts Programme 233 (34) 199 108 199 34 0 0 0 233
ICT Expenditure 162 (48) 114 114 114 48 0 0 0 162
Mortgage to Rent 249 (128) 121 121 121 128 0 0 0 249 
- less Government Grant (75) (75) (75) (75) 0 0 0 0 (75)
Total Other Investment in Council House Stock 4,999 0 (1,661) 3,338 2,856 3,338 991 3,558 0 0 7,887
Total Net Expenditure 46,695 0 (12,266) 34,429 29,019 34,429 33,996 18,256 10,698 9,423 106,802
Income
CAPITAL RECEIPTS 0 0 (18) 0 0 0 0 0 0
CFCR (1,684) (1,684) (1,684) (1,391) (1,382) (1,502) (1,991) (7,950)
TOTAL BORROWING REQUIREMENT 45,011 0 (12,266) 32,745 29,001 32,745 32,605 16,874 9,196 7,432 98,852
Page 84 of 186

Page 85

SIGNIFICANT CAPITAL PROJECTS
PROGRESS UPDATE
APPENDIX IV
Project Title Total
Gross
Budget
(£'000)
Third Party
Funding
(£'000)
Total Net
Budget
(£'000)
Projected
Outturn
(£'000)
Completion Date Contract
Awarded
On
Site
Status Change Since
Last Report
Additional Commentary
Blairgowrie Recreation
Centre - Replacement 36,000 0 36,000 36,000
Opened August 2025
Phase 2 Completion
Date TBC
Yes Yes On track No Phase 2 demolition of old recreation centre delayed, date tbc.
North/West Perth New
Primary School* 24,000 0 24,000 24,000 Summer 2028 No No On track No Revised Stage 1 report expected mid April with updated cost and
programme information
Perth High School - New
School Investment 80,200 0 80,200 80,200 School opened as
planned August 2025 Yes Yes On track No Phase 2 demolition underway
Bertha Park Link Road 16,322 1,064 15,258 15,258 December 2026 Yes Yes On track Yes -
completion date
Construction work continues and is progressing well. The works remain
ahead of programme and it is hoped that they will be substantially
completed by mid June 2026.
Comrie Flood Protection
Scheme 40,353 32,657 7,696 7,696 Autumn 2026 Yes Yes On track Yes -
completion date
Main construction works commenced in March 2025. Project on budget
and programmed for completion in late autumn 2026.
Perth Eco Innovation Park* 32,817 17,711 15,106 15,106 Not currently
programmed No No
Design package
awarded - design
programme on track
Yes
[See previous reports in relation to funding.]
Outline Design works generally progressing on programme with a
completion date of July 2026. Ground investigation works are complete
although a slight delay with reporting.  S42 application to vary conditions
submitted to PKC Planning and validated. To be considered at April
Committee.  Positive liaison continues with JDLT. High level programme
and stage gateway for detailed design and construction approved by
Council in 2026, and approval given to spend a further £1.5m on
detailed design.
PH2O 73,847 0 73,847 73,847 2030-31 No No
Thimblerow approved
as new site for PH2O
project, including
leisure water, at
Council on 18 June
2025.
Yes
Programme under development, procurement of main contractor and
design team has been completed via Hubco, - design will now
commence based on June 2025 approved brief.
Bells Sport Centre 10,000 0 10,000 10,000 Not currently
programmed No No Approved 18 June
2025 Yes
Early stages of development, Contractor appointed for intrusive surveys
, removal of RAAC and asbestos, feasibility of Council vision will be
informed by surveys and strip out, which are due to commence 13 April
2026 for 27 weeks.
Kinross Community
Campus Sports Facilities 6,900 0 6,900 6,900 Not currently
programmed No No Approved 18 June
2025 Yes Early stages of development, will be updated in future reports
Crieff Community Campus
Sports Facilities 6,300 0 6,300 6,300 Not currently
programmed No No Approved 18 June
2025 Yes Early stages of development, will be updated in future reports
Crieff Drummond Arms -
Regenertaion 3,000 0 3,000 3,000
DBN works completed
November 2025; LBC
still to be achieved 
Yes Yes
DBN works completed
October 2025; LBC
still to be achieved -
demolition of the
remainder of the
building outstanding
Yes 20/01/2025 Demolition split into two parts. 1st part are all works listed
within the Dangerous Building Notice (DBN) was completed November
2025. The site has been made secure and remains in the possession of
Beatties demolition who are carrying out weekly inspections. For
remainder of the demolition, listed building consent (LBC) is required.
Planning & HES updated on 2 March 2026 with the facade retension
options. Outstanding HES response before a decision can be made on
what will be done with the remainder of the building.
Multi Storey Flats - Energy
Efficiency Works (HRA) 7,060 548 6,512 6,512
Phase 1 - Pomarium
Blocks 7-51 & 52-95
Completion July 2026.
Phase 2a - Market,
Milne and Lickley Court
Lifts December 2026,
Phase 2b Market, Milne
and Lickley Court EWI
works May 2027 and 1-
48 Potterhill Flats June
2028.
Yes Yes Pomarium blocks on
site currently.
n/a
Phase 1 Pomarium Contract Works to two blocks on site until July 2026.
£5.7m Contract Sum. Works commenced on 14th July 2025. Block 1 is
7-51 includes, 45 flats (8 storey tower block). Block 52-95 includes 44
flats (11 storey tower block). Scottish Government HEEPS ABS funding
awarded July 2025 for Private Owners (applied for in May) and Private
Owners are share of cost are included in the Third Party Funding.
Phase 2a MML Lift replacements Contract is £1.1m is signed/approved,
Lifts in Manufacture, construction works for this Phase commenced on
site 23/03/2026. Income is £340k from Private Owners in blocks. Phase
2b for EWI/Roofing works (105 flats) is planned for commencement on
site July 2026 (grant funding application is to be made in May 2026 as
per Pomarium). Potterhill Flats (48 flats) planned for July 2027
commencement. Budget shown for all six blocks.
* Third Party Funding excludes Developer Contributions and receipts to be received in future years beyond the current 6-year programme.
7
Page 85 of 186

Page 86

Page 86 of 186

Page 87

CAPITAL BUDGET FINANCIAL RISKS APPENDIX V
1 Inflation Whilst inflation has reduced from the previous highs, there is strong evidence that
inflation will increase again in the immediate future, primarily as a result of
ongoing conflict in the MIddle East. Many projects are also subject to construction
inflation affecting labour rates and materials costs, which may differ from general
retail inflation.
2 Interest Rates Higher interest rates mean that borrowing is more expensive, and therefore the
Council can afford to borrow less. If interest rates are higher than the
budgeted/estimated rates over the period of the budget, this means some capital
expenditure funded by borrowing may need to be reviewed.
There is hightened risk that interest rates will remain at current levels for longer
than previously thought, or even be increased in a bid by the Bank of England to
combat expected inflationary increases as a result of conflict in the Middle East.
3 Staff Capacity The ability of Services to deliver the Council’s approved plans may be limited to
the availability of appropriately qualified and experienced staff and their capacity
to deliver the projects in the budgeted timescales. Staff turnover and delays in
recruitment may lead to delays in delivering projects.
4 Changing priorities /
regulations
Changing regulations can affect projects, for example building regulations and
new climate change requirements may require construction projects to be
reviewed and modified to meet the new regulations. This may lead to delays and
increased costs. Also, changes to the local demographics may mean the
Council’s priorities change over time, particularly when considering the Capital
Budget over several years into the future.
5 Capital Grant The Scottish Government Capital Grant allocations are made on an annual basis,
and therefore subsequent years estimates cannot be guaranteed.
6 Developer
Contributions
Developer Contributions are payable into future years, usually in line with house
building rates, and act as a contribution towards infrastructure already delivered
and expensed. These contributions therefore reduce the need for borrowing in
future, with completed infrastructure costs already incurred. There is a risk that
developer plans do not progress as anticipated and this can result in contributions
not materialising. The Developer Contributions income budget is currently
£12.364 million.
7 Compensation
Claims
The cost of completed capital projects can increase in future if claims for
compensation are received from contractors or other persons if land is purchased
or disturbed for projects. Whilst large capital projects include a degree of
contingency, the amounts potentially awarded for compensation can far exceed
this contingency and are not budgeted for.
7
Page 87 of 186

Page 88

Page 88 of 186

Page 89

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee: Finance and Resources Committee
Date of Meeting: 22 April 2026
Report Title: Treasury Activity and Compliance Report 2025/26 –
6 months to 31 March 2026
Report Number: 26/112
Report Author: John Jennings Senior Accountant
Organisational Lead: Scott Walker Chief Finance Officer
___________________________________________________________________
1. Purpose
1.1 The purpose of this report is to update the Committee on Treasury Activity for
the period 1 October 2025 to 31 March 2026 and to provide assurance on
compliance with the Council’s Treasury Management Policy Statement (TMPS),
Investment Strategy and Prudential Indicators.
1.2 This Treasury Activity and Compliance Report covers:
 Economic Background
 Treasury Activity
 Compliance
 Investment Strategy Compliance & Performance
 Prudential Indicators
 Conclusion
 Appendices
2. Recommendation
2.1 It is recommended that the Committee note the contents of this report.
3. Economic Background
3.1 The Bank of England’s Monetary Policy Committee (MPC) reduced the UK Bank
Base Rate from 4.0% to 3.75% on 18 December 2025 due to weak economic
growth and a steady fall in inflation over the period. The Base Rate has
remained the same over the remainder of the period, despite initial expectations
of a further reduction by March 2026. However, at the March meeting the MPC
voted unanimously to keep rates on hold due to the risks of the Middle East
conflict and concerns on the impact on inflation due to rising energy prices and
8
Page 89 of 186

Page 90

market volatility. There was also weak growth in the economy and rising
unemployment.
3.2 CPI inflation reduced from 3.6% in October 2025 to 3.2% in November 2025.
Although there was an increase in December 2025 to 3.4% due mainly to food
price increases, inflation fell again to 3.0% in January and February 2026 due to
falling petrol prices and lower air fares after Christmas. UK GDP (Gross
Domestic Product) remained at around 0.1% over the period with early 2026
data suggesting continued near zero economic growth.
3.3 Forecasts of the Bank Base Rate changed by the end of the period due to the
risks from the Middle East causing rising inflationary expectations from the large
increase in oil prices and supply pressures creating global economic
uncertainties and therefore putting upward pressures on Inflation.
3.4 Internationally, the Eurozone experienced growth of 0.2% in the 3 months to 31
December 2025, whilst CPI Inflation reduced to 1.9% in February 2026. 
Eurozone interest rates remained at 2.15% in March 2026. In the US, GDP grew
over the period to 0.7% at the end of December 2025, whilst inflation reduced
over the period. The US interest rate was reduced to the range of 3.50% to
3.75% in March 2026.
3.5 The Public Works Loan Board’s (PWLB) certainty fixed interest rates for the 6
months to 31 March 2026, which are based on yields on UK gilts, are shown in
the graph at Appendix I. Rates fell over most of the period, particularly for short
term borrowing, before rising sharply in March 2026 following the start of the
Middle East conflict. The 1-year rate initially fell over the period from 4.56% to
4.25%, before rising and peaking at 5.25% before ending the period at 5.02%.
All other rates followed a similar pattern, with the 50-year rate falling from 6.0%
to 5.61%, before rising to 6.24%, and ending at 6.03%.
4. Treasury Activity
4.1 A summary of the Council’s treasury position and transactions is shown at
Appendix II. The main activities are detailed below.
4.2 During the period 13 new PWLB loans were borrowed for a total of £190 million,
consisting of:
 4 fixed maturity loans totalling £55 million at an average rate of 4.31% and
for an average duration of 1.6 years, and
 9 fixed rate EIP (Equal Instalments of Principal) loans totalling £135 million
at an average rate of 4.32% and for an average duration of 3.4 years.
4.3 There was also the repayment of one maturing fixed rate maturity PWLB loan of
£5 million borrowed at 4.82% for 1 year. In addition, there were also the
scheduled instalments made on two PWLB EIP loans for £5 million and £6.25
million.
Page 90 of 186

Page 91

PWLB Premature Repayment of Debt
4.4 There was also the premature repayment of eleven PWLB fixed maturity loans
over the period totalling £55.5 million at an average rate of 4.70%.
4.5 In November 2025, following a period of rising longer-term interest rates, six
PWLB fixed Maturity loans totalling £28 million were repaid, at an average
interest rate of 4.52% and with between 30 to 35 years left to maturity. As the
interest rates on these loans were lower than the comparative PWLB rates at
that time, a discount of £2.268 million was received from the PWLB. In addition,
a total of £342,600 in interest charges will be saved over the next eight years,
and interest charges are anticipated to be neutral thereafter.
4.6 Following a further spike in longer term rates, there was further early repayments
made on the 23 February 2026 of four fixed Maturity PWLB totalling £22.5
million at an average rate of 5.02% and with between 30 to 38 years left to
maturity. This package of repaid debt allowed for the early repayment of one
historic loan of £7.5 million at 7.5%, by including other loans to offset the
premium on the higher rate loan. Overall, a net discount of £108,400 was
received from the PWLB together with annual savings of £155,000 in interest.
4.7 There was a final repayment of one fixed maturity PWLB loan for £5 million at
4.22% on 9 March 2026 and with 38 years left to maturity. This generated a
discount of £668,500, to offset the increase in interest rates on the Council’s
borrowing at the start of March 2026. In addition to the discount received from
the PWLB, the impact of these transactions on the Council’s interest charges is
anticipated to be neutral.
4.8 The repayment of all the above loans increased the Council’s borrowing
requirement for the year by £55.5 million.
4.9 Officers constantly assess the factors that are likely to impact on treasury
management and take proactive measures to protect the Council’s interests. 
Just two days before the conflict in the Middle East escalated, following an
assessment of the potential impact on future borrowing costs, the Council
undertook £45 million of new borrowing at 4.45% (£25 million) and 4.46% (£20
million). Had the Council deferred this borrowing until required, it would have
cost around an additional £418,000 per annum in interest charges over the next
two years. Consequently, the Council improved its ability to invest in the short
term, and to maintain its investment in the capital programme. On current
cashflow estimates, the Council does not require to start borrowing its 2026/27
requirement until July/August 2026.
4.10 As a result of all the above transactions, the Council’s total long-term debt
increased by £118.25 million from £688.95 million at an average interest rate of
2.86% to £807.2 million at an average interest rate of 3.05% as at 31 March
2026.
4.11 There were 22 short-term market loans borrowed in the period to manage daily
cashflows. These were borrowed as part of the adopted strategy during periods
when PWLB rates were high and allowed the Council to defer longer-term
borrowing until later in the year. Consequently, a total of £141.5 million was
Page 91 of 186

Page 92

borrowed for an average of 77 days at an average rate of 4.09%. There was £17
million of these temporary loans outstanding as at 31 March 2026.
4.12 Common Good and Charitable Fund balances held on fixed deposit with the
Loans Fund increased from £2.711 million to £2.796 million over the six-month
period, whilst the average interest rate decreased from 4.02% to 3.35%. Funds
held from associated bodies and organisations reduced from £2.933 million to
£2.501 million over the period, in line with their own cash flow requirements,
whilst the average rate paid on these funds reduced from 3.32% to 3.09% in line
with the rates applicable on individual loans depending on the balance held, and
which are linked to the prevailing Bank Base Rate.
4.13 Short term cashflow surpluses are invested in a mixture of fixed term deposits,
instant access accounts and money market funds. All investments were made in
accordance with the approved Investment Strategy and Permitted Investments
Fixed Term Deposits
4.14 Cashflow surpluses which arise during the year, and which are not immediately
required, are generally invested in fixed term deposits for periods of up to 12
months, or up to 3 years where forecast cashflow requirements allow.
4.15 There were eight fixed rate deposits made in the six months to 31 March 2026
(totalling £46 million) at an average interest rate of 6.91% and for an average
term of 21 days. This was an increase in fixed deposit activity in comparison to
the previous 6 months to the end of September. The deposits were undertaken
with other local authorities where opportunities arose within cashflow projections.
However, there were few opportunities as a result of the Council’s current
borrowing position, with most of these deposits occurring during March 2026,
coinciding with the time where local authority lending rates are at their highest.
The fixed deposits undertaken in the current period will generate interest of
£144,583 by their maturity.
Investments for Daily Cashflow Requirements
4.16 Cashflow surpluses which are required for more immediate needs were invested
in the Council’s instant access and Money Market Funds. The investment
transactions in the period can be summarised as follows:
 The daily average amount of such funds increased from £8.94 million in
the previous quarter to £10.28 million at the end of the current period,
reflecting the Council’s use of MMF’s for liquidity and lower balances
available for investment.
 The average interest rate achieved on these accounts over the period
reduced from 4.24% to 3.93%, in line with movements in the Bank Base
Rate.
 Money Market Funds, which operate on instant access terms, were used
extensively over the period. The average amount invested increased from
£12.075 million in the previous period to £12.589 million in the current
period, whilst the average interest rate reduced from 4.24% to 3.95%.
Page 92 of 186

Page 93

 The activity on these accounts reflects the need to keep a sufficient level
of funds for more immediate cashflow purposes over the period.
 Interest generated on these investments over the 6-month period
amounted to £459,763.
4.17 The total amount of investments outstanding as at 31 March 2026 was £21.917
million compared to £18.546 million at 30 September 2025. The overall
average rate of interest on the investments outstanding increased from 4.15% to
6.02% over this period. This reflects the increase in interest rates available within
the local authority lending market towards the end of the financial year.
4.18 Total income generated on investments undertaken during the period totals
£604,347 (£595,366 in the 6 months to 30 September 2025). This measure
reflects the total return on the investment activity undertaken in the period and is
slightly higher in comparison to the previous quarter with an increase in fixed
term deposit activity and higher local authority interest rates.
4.19 All of the above investment activities are consistent with the Council’s current
investment strategy and cashflow requirements.
5. Compliance
5.1 For the period ending 31 March 2026, there were no breaches in compliance
with the Council’s approved Treasury Management Policy Statement, Treasury
Management Practices (TMP’s) or lending limits as detailed in TMP 4 (Approved
Instruments, Methods & Techniques).
5.2 Appendix III shows the list of approved counterparties, based on the Council’s
current lending policy, as at March 2026.
5.3 For the period ending 31 March 2026 the average closing cleared bank balance
was £18,093.43 in credit. This reflects the application of the Council’s “sweep
facility” operated by the bank, with any credit balance in excess of £35,000 being
“swept up” overnight to the Council’s instant access account.
6. Investment Strategy Compliance And Performance
6.1 The Treasury Investment Strategy for 2025/26 was approved by the Council at
its meeting on 5 March 2025 (report 25/39 refers).
6.2 In the current period, the level of the Council’s investments peaked at £76.375
million on 18 March 2026 following the new borrowing earlier in March and
subsequently reduced to £21.917 million by 31 March 2026. The average daily
investment balance over the period was £25.790 million, which reduced from an
average of £29.589 million in the previous 6 months and from £33.154 million
in the same period of last year. This highlights the steady reduction in investment
balances over the last year as funds were applied in financing the approved
Capital programme. By the end of March 2026, there were three fixed rate
deposits remaining, whilst the instant access balances reflect the minimum
requirements to maintain day-to-day liquidity.
Page 93 of 186

Page 94

6.3 The approved Investment Strategy was applied in full over the period, with
liquidity being maintained using instant access accounts and Money Market
Funds as detailed in paragraph 4.16 above. There were no other risks identified
in the period.
6.4 The Investment Strategy also incorporates investments held by the Common
Good Funds. All such investments during the period were with the Council’s
Loans Fund. The only Council funds held by external fund managers relate to
Council-administered Charitable Trusts and are, therefore, not covered by this
Investment Strategy.
6.5 The budgeted income in 2025/26 for Commercial Property investments is £1.866
million whilst the latest projection is at £1.891 million. There were no new
property investments entered into during the current period.
7. Prudential Indicators
7.1 Prudential Indicators for 2025/26 to 2030/31 were approved by the Council at its
meeting on 5 March 2025 (report 25/39 refers) as part of the Annual Treasury
and Investment Strategy report.
7.2 The latest estimates of the Prudential Indicators are shown in Appendix IV and
are based on the Council’s revised Capital Budget being considered at this
Committee meeting. These show that the Council adhered to all Prudential
Limits in the period. However, the annual Loan Charges relative to the Net
Revenue stream and the Capital Financing (Borrowing) Requirement show an
increasing trend, which reflects the latest estimates for the Capital Programme
and interest rate forecasts over the period. Whilst they are forecast to remain
comfortably within their limits, they will be kept under review.
8 Conclusions
8.1 The Bank of England’s MPC reduced the Bank Base Rate to 3.75% in December
2025. The Base Rate remained the same over the rest of the period due to the
impact of the Middle East conflict and concerns for inflation.
8.2 Public Works Loans Board (PWLB) borrowing rates continued to be volatile over
the period due to inflationary expectations and mixed economic data. During the
6-month period rates increased in all durations, particularly in March 2026.
8.3 There were £190 million of new PWLB loans borrowed in the period, together
with the repayment of £71.750 million of PWLB loans. The early repayment of
these loans during the period generated a premium of £2.901 million and
discounts totalling £5.946 million to the Council, therefore generating £3.045
million in net income. These premature payments of debt are also estimated to
save over £1.3 million in interest charges over the next few years.
8.4 There was also the continuation of short-term local authority borrowing in the first
half of the period, whilst the Investment activity in the period consisted of a small
level of fixed term deposits, with instant access and Money Market Funds used
extensively to meet day-to-day cashflow requirements. The total level of
investments outstanding increased.
Page 94 of 186

Page 95

8.5 The Council adhered to its Investment Strategy and policies throughout the
period, with no breaches in compliance. The Council’s Prudential Indicators were
also adhered to throughout the period.
9. Impact and Value Assessment
9.1 This is an operational report, and as such, an impact and value assessment in
not required.
10. Appendices
Appendix I - PWLB Fixed Maturity Interest Rates from 1 October 2025 to 31
March 2026
Appendix II - Summary of the Treasury Position and Transactions from
1 October to 31 March 2026
Appendix III - Approved Investment Counterparty List
Appendix IV - Monitoring of Prudential Indicators - Period ending 31 March 2026
Page 95 of 186

Page 96

Page 96 of 186

Page 97

PWLB FIXED CERTAINTY INTEREST RATES
1 OCTOBER 2025 TO 31 MARCH 2026
Appendix I
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
6.50
01-Oct-25
08-Oct-25
15-Oct-25
22-Oct-25
29-Oct-25
05-Nov-25
12-Nov-25
19-Nov-25
26-Nov-25
03-Dec-25
10-Dec-25
17-Dec-25
24-Dec-25
31-Dec-25
07-Jan-26
14-Jan-26
21-Jan-26
28-Jan-26
04-Feb-26
11-Feb-26
18-Feb-26
25-Feb-26
04-Mar-26
11-Mar-26
18-Mar-26
25-Mar-26
1 Year
5 Years
10 Years
20 Years
30 Years
50 Years
8
Page 97 of 186

Page 98

Page 98 of 186

Page 99

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 OCTOBER 2025 TO 31 MARCH 2026
APPENDIX II
1 LONG TERM BORROWING
(a) Long Term Borrowing 1 October to 31 March 2026
Average Average Amount
No. Rate (%) Life (years) (£)
PWLB - Fixed Maturity Debt  4 4.31% 1.6 55,000,000
PWLB - Fixed EIP Loan Debt  9 4.32% 3.4 135,000,000
13 4.32% 2.9 190,000,000
(b) Long Term Debt Repayments 1 October to 31 March 2026
Average Amount
No. Rate (%) (£)
PWLB - Maturity Loan - Scheduled Repayments 1 4.82% 5,000,000
PWLB - Maturity Loan - Premature Debt Repayments 11 4.70% 55,500,000
PWLB - EIP Loan - Scheduled Repayments 2 4.66% 11,250,000
14 4.70% 71,750,000
(c) Long Term Debt Outstanding
Outstanding Average Outstanding Average
30-Sep-25 Rate 31-Mar-26 Rate
£ £
Public Works Loan Board 635,750,000 2.72% 754,000,000 2.94%
Money Market Loans 53,200,000 4.57% 53,200,000 4.57%
TOTAL 688,950,000 2.86% 807,200,000 3.05%
2 SHORT TERM BORROWING
(a) Short Term Market Borrowing - 1 October to 31 March 2026
Average Average Average Interest
No. Amount (£) Rate (%) Term (Days) (£)
Temporary borrowing 22 6,431,818 4.09% 77 1,240,089.04
22 6,431,818 4.09% 77 1,240,089.04
(b) Short Term Borrowing Outstanding
Outstanding Average Outstanding Average
30-Sep-25 Rate 31-Mar-26 Rate
£ £
Market Borrowing 61,500,000 4.06% 17,000,000 4.24%
Common Good and Charitable Funds 2,710,569 4.02% 2,796,000 3.35%
Local Trusts & Investors 2,933,157 3.32% 2,501,257 3.09%
TOTAL 67,143,726 4.02% 22,297,257 4.00%
8
Page 99 of 186

Page 100

SUMMARY OF THE TREASURY POSITION AND TRANSACTIONS
1 OCTOBER 2025 TO 31 MARCH 2026
APPENDIX II
3 INVESTMENTS
(a) Investment Transactions - 1 October to 31 March 2026
Average Average Average Total
Fixed Deposits & Investments No. Amount (£) Rate (%) Term (Days) Interest (£)
Other Local Authorities 8 5,750,000 6.91% 21 144,583.56
8 5,750,000 6.91% 21 144,583.56
Average Average Total
Instant/Notice Accounts & Money Market Funds Amount (£) Rate (%) Interest (£)
Instant Access/Notice accounts 1,015,650 2.96% 6,796.88
Money Market Funds 12,588,571 3.95% 452,966.47
10,281,551 3.93% 459,763.35
(b) Investments Outstanding Outstanding Average Outstanding Average
30-Sep-25 Rate 31-Mar-26 Rate
£ £
UK Banks 70,962 2.62% 216,548 1.95%
Foreign Banks and Institutions 5,000,000 4.34% 0 0.00%
Other Local Authorities 0 0.00% 16,000,000 6.86%
Money Market Funds 13,475,000 4.09% 5,700,000 3.83%
TOTAL 18,545,962 4.15% 21,916,548 6.02%
Page 100 of 186

Page 101

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Fitch Credit CDS Maximum
Country Rating Range Lending
Category 1 - Principal UK Clearing Banks  -  40% Investment total (or £20M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Bank of Scotland (RFB) (5) UK AA-, F1+ In range 12 months
Barclays Bank plc (NRFB) (5) UK A+, F1 No data 6 months
Barclays Bank plc (RFB) (5) UK A+, F1 In range 6 months
Goldman Sachs International Bank UK A+, F1 In range 6 months
Handelsbanken plc UK AA, F1+ No data 12 months
HSBC Bank plc (NRFB) UK AA-, F1+ In range 12 months
HSBC Bank plc (RFB) UK AA-, F1+ No data 12 months
Lloyds Bank Corporate Markets Plc (NRFB) UK AA-, F1+ No data 12 months
Lloyds Banking Group plc (RFB) UK AA-, F1+ In range 12 months
NatWest Markets Plc (NRFB) UK AA-, F1+ In range 12 months
Royal Bank of Scotland plc (RFB) (inc Nat West) UK AA-, F1+ In range 6 months
Santander UK plc (inc Cater Allen) UK A+, F1 No data 12 months
Standard Chartered Bank UK A+, F1 In range 6 months
Category 2 - Foreign Banks & Institutions -  25% Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
Australia and New Zealand (ANZ) Banking Group Ltd Aus AA-, F1+ In range 12 months
Commonwealth Bank of Australia Aus AA-, F1+ In range 12 months
Macquarie Bank Ltd Aus A+, F1 No data 12 months
National Australia Bank Ltd Aus AA-, F1+ In range 12 months
Westpac Banking Corporation Aus AA-, F1+ In range 12 months
BNP Paribas Fortis Bank Belgium A+, F1 No data 1 month
KBC Bank Belgium A+, F1 No data 1 month
Bank of Montreal Can AA-, F1+ No data 12 months
Bank of Nova Scotia Can AA-, F1+ No data 12 months
Canadian Imperial Bank of Commerce Can AA-, F1+ No data 12 months
National Bank of Canada Can A+, F1 No data 12 months
Royal Bank of Canada Can AA-, F1+ No data 12 months
Toronto Dominion Bank Can AA-, F1+ No data 12 months
Danske Bank Denmark A+, F1 In range 6 months
Nordea Bank Finland plc Finland AA-, F1+ No data 1 month
BNP Paribas France A+, F1 In range 1 month
Credit Agricole Corporate and Investment Bank France A+, F1 In range 1 month
Credit Agricole SA France A+, F1 In range 1 month
Credit Industriel et Commercial France A+, F1 No data 1 month
DZ Bank AG Germany AA-, F1+ No data 12 months
Landesbank Hessen-Thueringen Girozentral (Helaba) Germany A+, F1+ In range 12 months
Landwirtschaftliche Rentenbank Germany AAA, F1+ No data 24 months
NRW Bank Germany AAA, F1+ No data 24 months
ABN AMRO Bank Netherlands A, F1 No data 6 months
Bank Nederlandse Germeenten Netherlands AAA, F1+ No data 24 months
Cooperatieve Rabobank Netherlands A+, F1 In range 12 Months
ING Bank Netherlands AA-, F1+ In range 12 Months
DBS Bank Limited Singapore AA-, F1+ No data 12 months
United Overseas Bank Ltd Singapore AA-, F1+ No data 12 months
Skandinaviska Enskilda Banken AB Sweden AA-, F1+ No data 12 months
Svenska Handelsbanken AB Sweden AA, F1+ No data 12 months
Swedbank AB Sweden AA-, F1 No data 12 months
UBS AG Switzerland A+, F1+ In range 12 months
Bank of America, NA USA AA, F1+ No data 12 months
Bank of New York Mellon USA AA, F1+ No data 24 months
Citibank, NA USA A+, F1 In range 12 months
JP Morgan Chase Bank, NA USA AA, F1+ No data 24 months
Wells Fargo Bank, NA USA AA-, F1+ In range 12 months
8
Page 101 of 186

Page 102

APPROVED INVESTMENT COUNTERPARTY LIST APPENDIX III
Category 3 - Subsidiary Banks & Building Societies - 15% of Investment total (or £10M per Counterparty if higher)
(Minimum rating required Fitch A, F1)
(parent bank shown in brackets)
Subsidiary Banks
None
Building Societies
Nationwide Building Society UK A, F1 No data 6 months
Category 4 - Other Local Authorities - 20% of Investment total (or £20M per Counterparty if higher)
As arranged
Category 5 Money Market Funds - 10% of Investment Total (or £10M per Counterparty if higher)
(Minimum rating required Fitch AAA)
Aberdeen Standard Investments UK AAA
Aviva Investors Liquidity Fund UK AAA
Federated Sterling Liquidity Fund (Class 3) UK AAA
Insight Sterling Liquidity Fund (Class 5) UK AAA
Deutsche Bank Sterling Fund UK AAA
Note:
(1) - Standard & Poor's credit ratings shown, as no Fitch credit rating available
(2) - All Soveriegn credit ratings for above Countries are AAA, unless stated otherwise.
Last Updated: 15-Apr-26(3) -  NRFB = Non Ring Fenced Bank,  RFB = Ring Fenced Bank
Page 102 of 186

Page 103

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 31 MARCH 2026
APPENDIX IV
1 Financing Costs:Net Revenue Stream
The ratio of Capital Financing Costs (Loan Charges) to the Council's net revenue stream shall not exceed the following limits, which are based on historic levels, and allow some
headroom for movement in interest rates. The estimated Financing Costs below are based on the latest monitoring figures.
2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Prudential Limit - General Fund 15.00% 15.00% 15.00% 15.00% 15.00% 15.00%
Estimated Ratio of Financing Costs to Revenue 7.80% 7.56% 8.67% 9.04% 9.44% 9.91%
Prudential Limit - HRA 30.00% 30.00% 30.00% 30.00% 30.00% 30.00%
Estimated Ratio of Financing Costs to Revenue 23.51% 22.70% 26.48% 26.89% 26.98% 27.24%
2 Gross & Net Borrowing and Capital Financing Requirements
For prudence, net external borrowing must not exceed the total capital financing requirement, thus ensuring that over the medium term, borrowing is only undertaken for capital
purposes. The estimated total net borrowing and Capital Financing Requirement at the end of each of the years are as follows:
Projected Projected Projected Projected Projected Projected
31-Mar-26 31-Mar-27 31-Mar-28 31-Mar-29 31-Mar-30 31-Mar-31
Net External Borrowing* 906,182,000 1,031,391,000 1,121,085,000 1,194,378,000 1,250,505,000 1,307,443,000
Gross External Borrowing* 928,099,000 1,052,391,000 1,141,085,000 1,214,378,000 1,270,505,000 1,327,443,000
Capital Financing Requirement 992,000,000 1,116,746,000 1,195,903,000 1,250,350,000 1,292,357,000 1,346,390,000
*For the purpose of this indicator, Borrowing includes the outstanding liability under PPP/PFI contracts.
3 Estimates of Gross Capital Expenditure
The total estimated Capital Expenditure contained within the Council's Budgets for each year is as follows, based on updated monitoring figures.
Composite Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current estimate 97,437,000 127,791,000 112,634,000 83,712,000 72,750,000 79,076,000
Original Budget Estimate 147,463,000 131,218,000 90,468,000 65,909,000 48,527,000 44,716,000
Movement in Estimated Capital Expenditure (50,026,000) (3,427,000) 22,166,000 17,803,000 24,223,000 34,360,000
The Original Budget Estimates are those per the Capital Monitoring Report on 30 April 2025, and incorporating 2030/31 approved expenditure from 26 February 2025
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 22 April 2026.
HRA Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current estimate 34,429,000 33,996,000 18,256,000 10,698,000 9,423,000 21,044,000
Original Budget Estimate 28,098,000 14,411,000 14,265,000 12,076,000 20,044,000 20,000,000
Movement in Estimated Capital Expenditure 6,331,000 19,585,000 3,991,000 (1,378,000) (10,621,000) 1,044,000
The Original Budget Estimates are those per the Capital Monitoring report on 30 April 2025, incorproating 2029/30 approved expenditure on 27 January 2025, and January 2026 for 2030/31.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 22 April 2026.
8
Page 103 of 186

Page 104

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 31 MARCH 2026
APPENDIX IV
4 Estimate of Capital Financing Requirement
The estimate (as at March 2026) of the Capital Financing Requirement (ie new borrowing requirement for Capital Expenditure) for each year based on these plans is as follows:
Composite Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current Estimated Capital Financing Requirement 81,103,000 107,840,000 79,904,000 64,581,000 54,825,000 57,362,000
Original Budget Estimate 132,216,000 103,393,000 67,055,000 48,178,000 30,302,000 26,966,000
Movement in Estimated Capital Financing Requirement (51,113,000) 4,447,000 12,849,000 16,403,000 24,523,000 30,396,000
The Original Budget Estimates are those per the Capital Monitoring Report on 30 April 2025, and incorporating 2030/31 approved expenditure from 26 February 2025
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 22 April 2026.
HRA Programme 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31
Current Estimated Capital Financing Requirement 32,745,000 32,605,000 16,874,000 9,196,000 7,432,000 18,735,000
Original Budget Estimate 26,615,000 12,865,000 12,652,000 10,063,000 17,659,000 17,500,000
Movement in Estimated Capital Financing Requirement 6,130,000 19,740,000 4,222,000 (867,000) (10,227,000) 1,235,000
The Original Budget Estimates are those per the Capital Monitoring report on 30 April 2025, incorproating 2029/30 approved expenditure on 27 January 2025, and January 2026 for 2030/31.
The latest estimates for Capital Expenditure are based on the F&R Capital Monitoring Report No 4 on 22 April 2026.
5 External Debt (Gross and Net)
Projected Projected Projected Projected Projected Projected
External Borrowing 31-Mar-26 31-Mar-27 31-Mar-28 31-Mar-29 31-Mar-30 31-Mar-31
Public Works Loan Board 754,000,000 900,694,444 1,014,888,889 1,093,583,333 1,155,111,111 1,217,750,000
Market Bonds (LOBOs) 53,200,000 53,200,000 33,200,000 33,200,000 33,200,000 33,200,000
Project Borrowing 0 0 0 0 0 0
Special Loans 2,796,000 2,796,000 2,796,000 2,796,000 2,796,000 2,796,000
Temporary Loans/Other Borrowing 19,501,257 2,500,000 2,400,000 2,400,000 2,400,000 2,400,000
Other Long Term Liabilities (PPP/PFI) 98,601,472 93,200,672 87,799,872 82,399,072 76,998,272 71,297,472
Total Gross External Debt 928,098,729 1,052,391,116 1,141,084,761 1,214,378,405 1,270,505,383 1,327,443,472
Short Term Investments (21,916,548) (21,000,000) (20,000,000) (20,000,000) (20,000,000) (20,000,000)
Long Term Investments 0 0 0 0 0 0
Total Net External Debt 906,182,181 1,031,391,116 1,121,084,761 1,194,378,405 1,250,505,383 1,307,443,472
Note:
Operational Boundary 929,000,000 1,053,000,000 1,142,000,000 1,215,000,000 1,271,000,000 1,328,000,000
Authorised Limit 1,300,000,000 1,355,000,000 1,355,000,000 1,355,000,000 1,355,000,000 1,355,000,000
The Operational Boundary and Authorised Limit are based on Gross External Debt.
Page 104 of 186

Page 105

PERTH AND KINROSS COUNCIL
PRUDENTIAL INDICATORS - 6 MONTHS ENDING 31 MARCH 2026
APPENDIX IV
6 Principal Sums Invested Longer Than 365 Days
The Upper Limit for sums invested for over 1 year up to 3 years is £45 million. There were no amounts invested within this period as at 31 March 2026.
7 MATURITY STRUCTURE
The lower and upper limit for the proportion of the Council's total-long term debt which matures in each of  the time bandings below, and is therefore subject to refinancing at the
prevailing market rates, is as follows:
Borrowing Maturity Structure Lower Limit Upper Limit Estimated
Under 12 months 0% 35% 11.45%
over 12 months and < 24 months 0% 35% 12.28%
over 2 years and < 5 years 0% 50% 14.75%
over 5 years and < 10 years 0% 75% 2.93%
over 10 years 10% 95% 58.59%
The maurity profile for the Council's current long-term portfolio as at 31st March 2026, measured from the start of the financial year, is as follows:
Less 1 Year 1 - 2 Years 2 - 5 Years 5 - 10 Years 10 - 20 Years 20 - 30 Years 30 - 40 Years 40 - 50 Years Over 50 Years Total
PWLB 30,000,000 50,000,000 57,500,000 0 5,000,000 0 60,000,000 384,000,000 0 586,500,000
PWLB EIP 68,305,556 55,805,556 39,638,889 3,750,000 0 0 0 0 0 167,500,000
LOBOs 0 0 20,000,000 0 0 8,000,000 25,200,000 0 0 53,200,000
Other 0 0 0 0 0 0 0 0 0 0
PPP/PFI 5,400,800 5,400,800 16,502,400 22,803,200 48,494,272 0 0 0 0 98,601,472
Total 103,706,356 111,206,356 133,641,289 26,553,200 53,494,272 8,000,000 85,200,000 384,000,000 0 905,801,472
Percentage 11.45% 12.28% 14.75% 2.93% 5.91% 0.88% 9.41% 42.39% 0.00% 100.00%
Page 105 of 186

Page 106

Page 106 of 186

Page 107

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________
Committee or Board: Finance and Resources Committee
Date of Meeting: 22 April 2026
Report Title: Transformation & Change Programme Update
Report Number: 26/113
Report Author: Charlene Guild, Strategic Lead – Projects &
Programmes (interim)
Organisational Lead: Thomas Glen, Chief Executive 
___________________________________________________________________
1. Purpose
1.1 The purpose of this Report is to provide Members of the Finance and
Resources Committee with an update on progress of the Transformation &
Change Programme – Phase Two. This covers the six-month period from
1 October 2025 to 31 March 2026 and provides a full detailed progress
summary of individual phase two projects. It also provides an overview of
plans for the transition to Phase Three of the programme in July 2026.
1.2 Sections
1. Purpose
2. Recommendation
3. Background and introduction
4. National and Regional Context
5. Transformation and Change Programme Updates
6. Transformation & Change Programme Phase Three
7. Partnership Working
8. Conclusion
9. Appendices
2. Recommendation
It is recommended that the Finance and Resources Committee:
2.1 Note the progress made on the Transformation & Change Programme Phase
Two since the last report of October 2025 (No 25/250). In addition, members
should note the positive progress by individual projects across the programme
9
Page 107 of 186

Page 108

(Appendix 1) and the plans for developing our approach further in Phase
Three.
3. Background and introduction
3.1 Our Transformation & Change Programme phase two has been ongoing since
August 2024. Regular reporting of progress, evaluation and delivery of
outcomes has been presented regularly to Finance & Resources Committee
on a biannual basis.
3.2 Supporting the delivery of the Councils vision of “a Perth and Kinross where
everyone can live life well, free from poverty and inequality,” all of our projects
and workstreams are aligned with the Corporate Plan strategic priorities and
key objectives with defined project outcomes, objectives, and critical success
factors.
3.3 As we start to develop plans for Phase Three from July 2026, the
Transformation & Change programme continues to be an ambitious area of
work which aims to positively impact our communities, our teams, and how
they deliver. We are taking into consideration the current national context and
local landscape, which simply put, is one of increasing demands and
decreasing resources. Moving forward, transformation and innovation will be
critical to sustainability and will require a flexible, innovative, and agile
approach. Continuing to focus on those areas in greatest need as well as our
key corporate priority areas, will be central to our renewed approach. In
addition, the continued support of our teams, partners, and communities, will
continue to ensure that the people of Perth and Kinross are at the heart of all
that we do, as we evolve the programme to face the challenges ahead.
4. National and Regional Context
4.1 SOLACE/Improvement Service National Transformation Programme
Nationally, transformation and change activity is being driven by SOLACE and
the Improvement Service. The national Transformation & Change Programme
is designed to provide a shared framework and learning for local authorities
across Scotland to strengthen their approach to large scale, complex
transformation, innovation, and change. It brings together Chief Executives,
senior leaders and transformation professionals to explore how Councils can
respond to the financial challenges, rising demand and increasing public
expectations through more deliberate, systemwide transformation rather than
isolated improvement activity. There is a clear national direction of travel
towards public service reform, with greater emphasis on prevention and early
intervention, digital enablement, workforce sustainability, data informed
decision making, and collaboration across organisational boundaries to
improve outcomes and make best use of limited resources.
4.2 PKC are participating fully in the programme, benchmarking our approach to
transformation and business improvement against other councils, discussing
the programme with colleagues across the country and contributing to
Page 108 of 186

Page 109

national conversations on the impact of “good” transformation projects. This
has reinforced the importance of having clear definitions, strong governance,
consistent project management, and sufficient capacity to continue to deliver
change at pace and scale.
4.3 Regional Context: Joint Working and Collaboration
In addition to the national programme, there is an increasing expectation,
which was stated within our recent Best Value Audit on Transformation and
Change in 2025, that councils strengthen regional collaboration and joint
working where this can add value, reduce duplication and support delivery of
shared priorities. Many of the challenges facing local government are
common across the different areas and would benefit from more collaborative
approaches. We are already working with our regional colleagues in Dundee
and Angus on developing areas of joint need as well as more widely across
the country and partnerships in specific project areas.
4.4 Our next phase of Transformation should give an opportunity to take a more
strategic and selective approach to regional and partnership working, focusing
on areas where collaboration can demonstrably improve outcomes,
accelerate delivery or make better use of limited specialist capacity.
5. Transformation and Change Programme Updates
5.1 Key Highlights
Over the past year, the programme has delivered a number of notable
outcomes and milestones with strong progress across major projects with a
full detailed update contained in Appendix 1. Key highlights have included:
 Working Smarter, securing key property assets and shared tenancy
arrangements with partners such as NHS Tayside, aligned to the One
Public Estate approach.
 Whole Family Wellbeing, delivering measurable improvements in
service access, practitioner collaboration, and direct and indirect
support to families.
 Public Transport in the Community, strengthening community transport
provision and completing a major public engagement exercise to inform
future delivery.
 Additional Support Needs, progressing phased expansion of Intensive
Support Provision following extensive consultation.
 Zero Waste and Operations, piloting improved recycling arrangements
within schools through close engagement with staff and pupils.
 ALEO Options Appraisal Review – closure of this project with the
recommendation for a Strategic Alliance between all organisations
underway.
5.2 In addition, the programme was expanded with the addition of new projects
focused on:
 Health, wellbeing, and attendance within the education workforce; and
Page 109 of 186

Page 110

 Automation within People & Culture, improving the use of data, digital
tools, and management information.
These developments demonstrate the programme’s ability to adapt to
emerging pressures while maintaining a clear line of sight to strategic
priorities. A full and detailed summary of all current projects within phase two
is contained in Appendix 1.
In addition, we have included additional appendices to deepen understanding
of the current programme and project delivery. Appendix 2 provides a sample
of one page overviews of projects in a visual way, giving a breakdown of
benefits realised as well as key milestones reached. We have also included a
focussed case study of the AI project and its progress in Appendix 3, which
sets out an example of the work being carried out and efficiencies being
considered while planning for future implementation.
5.3 Best Value Audit – follow up actions
Audit Scotland’s, best value thematic audit on Transformation and Change
was completed in August 2025 and provided important external validation of
the Council’s approach. The audit highlighted strengths across the
programme including:
 A clear and coherent strategic framework for transformation and
change
 Effective programme governance and oversight through the
Programme Management Office
 Strong engagement with communities and partners using participatory
service design methods; and
 Clear communication and reporting to elected Members.
5.4 The audit also made the following recommendations below, with an update on
actions taken to address these:
1. Ensure that transformation plans are ambitious enough to address funding
gaps and clearly set out projected savings.
2. Establish arrangements to support, coordinate, and report on the
Transformation and Change Programme after the PMO's term ends in
April 2026.
5.5 As we develop plans for Phase Three of the Transformation & Change
programme, we are ensuring we focus on these areas of greatest impact and
outcome for people in communities. To do this, we are considering
streamlining the programme with an emphasis on those projects which will
result in savings, resource efficiencies and improved delivery and outcomes
for people. We are also working with our finance colleagues to ensure that we
are being measured and clear in our rationale for savings and funding gaps –
making these more easily reportable and accessible.
Page 110 of 186

Page 111

Further to this, there are proposals for some change in terms of the PMO
approach which would see a consolidation of our transformation and
business improvement areas, where there is significant cross over.
3. Conduct Equality and Fairness Impact Assessments for transformation
projects, ensuring appropriate detail at each stage.
This action is already being noted and will be an integral part of the Phase
Three project planning process.
4. Enhance benefits realisation arrangements to demonstrate that the
Transformation and Change Programme is delivering its intended
outcomes.
5.6 Work has already been completed to ensure that our transformation & change
systems have the ability to record benefits realised within projects in real time.
These will be reported to F&R Committee through individual project updates.
5.7 We have continued to make steady progress across the programme over the
last six months and are now looking ahead to Phase Three which will focus on
a more targeted, sustainable and outcomes focused approach, reflecting both
the learning from delivery to date and the scale of the financial and service
pressures anticipated over the medium term.
6. Transformation & Change Programme Phase Three
6.1 As the programme looks beyond Phase Two, a number of recommendations
have been discussed at Transformation Board for taking forward Phase Three
activity with a focus on both Transformation and Business Improvement. This
will enable a more targeted, sustainable and outcomes focused approach,
reflecting both the learning from delivery to date and the scale of the financial
and service pressures anticipated over the medium term. In particular, it is
important that Phase Three sharpens the strategic focus of transformation
projects so that plans are sufficiently ambitious to address funding gaps, with
a clearer line of sight between change activity, resources available in the
wider organisation, projected savings/resource efficiencies, and protection of
outcomes for those in greatest need.
6.2 Recommendations for phase 3 include:
 Agree criteria and definitions to distinguish Transformation projects from
Business Improvement projects allowing clearer classification of existing
and future work.
 Consolidate the current Programme Management Office (PMO) and
Business Improvement Team into a single Transformation & Improvement
Team (with the team’s reporting line to be confirmed as part of wider
considerations on current leadership structures). This includes maintaining
strong governance and prioritisation, strengthening leadership and change
capacity, and ensuring teams have the tools and support to deliver
redesign at pace alongside core service delivery. Workforce
Page 111 of 186

Page 112

considerations are central to this, including health and wellbeing,
leadership capability, digital skills, and the capacity to absorb and
implement change.
 Re-classify the current portfolio using the agreed definitions—streamline
the transformation programme so only a reduced number of priority
areas/projects remain “Transformation,” with the remainder managed as
Business Improvement under proportionate governance.
 Implement a revised governance structure for Transformation &
Improvement, using a clear three-tier model: Transformation Board (SLT-
level), Project Working Groups, and Core Project Teams (operational
delivery).
6.3 Recommendations also highlight the need to enhance benefits realisation and
impact reporting, so that the Council can demonstrate more consistently how
Phase Three activity contributes to financial sustainability, service quality, and
community outcomes, with benefits captured in a timely way and reported
through established governance and Committee updates. In parallel, Phase
Three should continue to embed equality, fairness and participation, ensuring
Equality and Fairness Impact Assessments are proportionate and undertaken
at appropriate stages, and that engagement with communities, partners and
staff remains integral to project design and decision making.
6.4 A mapping exercise of current transformation and business improvement
resources is underway to ensure that we are targeting resources in the areas
of most need. At this time, we know that there are approximately eight (FTE)
posts dedicated to transformation and business improvement between PKC
and the HSCP. In addition, around five of our current transformation projects
have dedicated or shared project resource – ranging from Project Manager to
Assistant level posts.
6.5 In addition to the current programme and the changes being proposed, the
Programme Management Office have started to hold a series of workshops
with Senior Officers to explore new opportunities for transformation and
innovation in future. There will also be individual meetings with Strategic
Leads to look at specific service areas and determine those which would be
suitable for transformation activity. Details of progress in this area will be
reported to F&R Committee as we progress with plans for Phase Three.
6.6 As we develop, plan and implement Phase Three of the programme, we will
undertake an exercise to ensure that resources are targeted within projects
where the greatest impact and efficiencies with be realised as well as
providing a generic pool of project support and assistance when required. 
7. Partnership Working
7.1 HSCP – our collaborative and joint work with our HSCP Transformation &
Change colleagues continues through regular meetings. Our HSCP
colleagues have attended the PKC Transformation Board to update on project
progress and discuss areas of shared interest. It was agreed that this
approach would continue on a regular basis moving forward. An update on
Page 112 of 186

Page 113

the HSCP Transformation Programme was tabled to the Perth & Kinross
Integration Joint Board Audit and Performance Committee on 23 February
2026, a link to this report is here, and is included as Appendix 4 to this report.
7.2 External Partners - We continue to work alongside our other Local Authority
colleagues, specifically on a regional basis, to consider areas of
transformation where a regional approach or shared services could prove to
be more efficient and effective. We are also working with NHS Tayside on
collaborative programmes in leadership development as well as with our
ALEO’s on the Strategic Alliance. We will continue to build on and expand
these projects with our external partners.
7.3 National engagement – Our PMO continue to be involved in the national
transformation and change programme being led by the Improvement Service
and SOLACE to consider areas such as public sector reform, shared services,
procurement, digital, and governance. Update reports on outcomes achieved
will be presented when available.
7.4 Communities and citizens - We have committed to working with our
communities and partners through our Corporate Plan key priorities and
individual project delivery. Project teams have been conducting extensive
engagement activity through service design events, workshops and focus
groups as well as other methods such as online questionnaires and surveys,
virtual meetings, and research. Some of this activity has been reported
through the phase two summary updates found in Appendix 1. The PMO will
continue to provide support and facilitation for project teams who need it in
terms of engagement methods such as service design, facilitation skills, and
tools to collate data in a participatory way.
7.5 Elected Members – we continue to provide regular updates on the
overarching Transformation & Change programme as well as detailed
summaries on the progress of each individual project at Finance & Resources
Committee. In addition, individual project managers are providing detailed
briefing sessions to allow Elected members to dive deeper into project areas
for greater understanding of expected outcomes and workstreams underway.
7.6 The continuing development of the council’s transformation, change and
business improvement activities will aim to compliment and support the
refresh of the Council’s Corporate Plan, scheduled to begin later this year,
which will consider our current vision and priorities and how we balance the
need for service redesign with our focus on the provision of universal services
alongside a greater targeted interventions for those individuals and
communities which face the greatest challenges across Perth and Kinross.
8. Conclusion
8.1 Over the past six months (October 2025 to March 2026), the Transformation
& Change Programme has continued to maintain momentum, with projects
progressing against key milestones, additional activity brought into scope to
respond to emerging pressures, and further improvements made to benefits
Page 113 of 186

Page 114

realisation and reporting. It has also been a time of planning for the next
phase of our programme.
8.2 The transition to Phase Three from July 2026 will build on this progress by
taking a more targeted approach to the portfolio, embedding sustainable
transformation and business improvement capacity beyond the current PMO
arrangements. We will focus on strengthening the current governance
processes for progressing and reporting transformation and improvement
activity and focussing on the link between transformation activity, deliverable
savings/resource efficiencies, and transparent reporting to Members.
9. Appendices
Appendix 1 - Phase 2 Project Summary Updates
Appendix 2 - Sample of Project Overviews - April 2026
Appendix 3 - AI Case Study
Appendix 4 - HSCP Transformation Programme Update - 23 Feb 26
Page 114 of 186

Page 115

Appendix 1
PKC - GENERAL
Transformation and Change
– reshaping our organisation
Phase Two Project Summary
Updates – April 2026
9
Page 115 of 186

Page 116

Appendix 1
PKC - GENERAL
Contents Page
Projects
1. Additional Support Needs (ASN)
2. AI and Automation
3. ALEO's Review
4. Automation within People & Culture
5. Business Systems Management Efficiency &
Rationalisation Project (BSMER)
6. Customer Services Transformation
7. Employability Service Review Project
8. Fairer Communities for All Model
9. Improving Health & Wellbeing and Attendance in the
Education Workforce
10. Leading: Our People, Our Purpose (formerly
Leadership Review Phase 2)
11. Perth Secondary Estate Review
12. Public Transport in the Community
13. Strategic Procurement & Commissioning Project
14. Tayside Contracts Review
15. Whole Family Wellbeing (WFWB) programme
16. Working Smarter
17. Zero Waste & Operations
Page 116 of 186

Page 117

Appendix 1
PKC - GENERAL
Project Name
1. Additional Support Needs (ASN)
Project Description
The Programme aims to transform educational provision by enhancing the quality of learning
environments and specialist support for children and young people, ensuring equity in
education, and delivering best value. It seeks to reduce expenditure on expensive external
placements by the Inclusion Service, redirecting the budget towards earlier intervention and
prevention in mainstream provision. Additionally, the Programme will establish clear ASN
pathways, develop ASN provision at all levels across the authority, increase capacity for
future PKC placements, reduce the number of pupils placed outside PKC ASN provision,
design a sustainable transport process, and provide regular reporting to monitor the financial
position. This will help comply with legal requirements and ensure quality provision is
delivered.
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Fiona MacKay
(Programme Sponsor: David Macluskey)
Programme Manager Jaclyn Meikle
Current Project Timeline
 Project start date 31/10/2023
 Planned project completion date 31/10/2028
This project is intended to support a fundamental change in our approach to
Additional Support Needs. Within PKC this project is scheduled to complete in
October 2028; however, the project outcomes will be delivered over a much longer
term.
Current status of the Project
Phase 2 shifts the focus to deeper system redesign. This includes strengthening
workforce planning, specialist capacity, pathways, and policy alignment. Together,
these areas will ensure the programme continues to meet its five year objectives and
statutory duties, while driving sustainable transformation across the People,
Partnerships, Place and Policy workstreams.
Page 117 of 186

Page 118

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Programme is anticipated to deliver the following:
1. Revised Staffing Standard and Allocation Model (Core & Exceptional) for
classroom-based support staff for implementation from 2025/6.
2. Reviewed and re-aligned support staff (PSA/PSSW) to meet need.
3. School leaders and staff clear on support roles & remit.
4. Identified staff groups are clear on responsibilities in relation to meeting
duties of ASL Legislation.
5. Annual ASN Learning Programme is made available to all staff that is
accessible and inclusive.
6. Increased number of staff have completed certified ASN inclusion training.
7. Progression Pathways for all staff groups.
8. Create communication enabling environments where almost all children, young
people, staff, and families feel safe and able to learn.
9. Recommendations identified in relation to:
a) Early intervention to reduce demand and escalation through staged levels
b) The physical environment of inclusive classrooms - Learning Spaces,
Experiences, and Interactions
c) Supporting parents
10. Improved local access to Intensive Support provisions (ISPs)
11. Reduced travelling distances for children and young people accessing ISPs,
resulting in reduced travel costs.
12. Standardised learning environments within Intensive Support provisions
(ISPs)
13. Revised support staffing model for Intensive Support provisions (ISPs)
14. PKC 16+ Transition Framework that enables young people to have a more
graduated approach as they move from school to employment, education, or
training.
15. Clear pathway(s) for young people not meeting criteria for established
pathways.
16. Improved consistency of delivery of post school planning & preparation
support.
17. Compass App embedded to support post school transition.
18. Redesigned Speech & Language Therapy contract for the delivery of
assessment and intervention for children and young people in education.
19. Improved access to Speech & Language Therapy for children and young
people in education
20. Reliable ASN SEEMiS Data.
21. Trained SEEMiS users supported by a revised SEEMiS Guidance Document.
22. School leaders will effectively use SEEMiS data to inform the development
of their Universal Offer within schools.
23. Partners will have access to the analysis of SEEMiS data to inform Future
Planning within other sectors.
24. Staff will be equipped with the skills, tools, and confidence to identify and
respond to emerging needs early with the right planning and approaches,
reducing escalation through staged levels of support.
Page 118 of 186

Page 119

Appendix 1
PKC - GENERAL
25. Less children will start P1 having not met developmental milestones and
requiring personal care.
26. Consistent curriculum model across all 4 years.
27. Staff in each sector have an increased alignment of teaching approaches.
28. Standardised transition processes, supported by consistent information
sharing processes.
29. A Transition Framework established offering a graduated move from school
to employment, education, or training—with clear, inclusive pathways for
those outside currently established routes
30. Greater consistency in post-school planning and support through the
integration of the Compass App.
31. The network of statutory and 3rd sector support that meets the holistic
needs of children and young people with ASN is comprehensive and
accessible to Named Persons.
32. Agreed pathways to support are established that are easy to navigate for
both Named Persons and families.
33. An annual ASN/Inclusion Conference or Roadshow that brings families,
professionals, and services together to share, learn, and connect
34. Parents and carers will be better informed and more confident in
understanding the CYPP process so that they can meaningfully contribute
to decisions that affect their child’s learning and wellbeing.
35. Improved availability and accessibility of inclusive out-of-school care
options for children with ASN across Perth & Kinross.​
36. Improved confidence and satisfaction among families in accessing
consistent, needs-led care during term time and holidays.​
37. Clear referral and access pathways for Named Persons and families to
navigate out-of-school care services.
38. Reorganisation and allocation of all inclusion and centrally managed
resources to localities.
39. Headteachers and Inclusion Co-ordinators work collaboratively in localities
to ensure support is appropriately allocated to meet needs of C&YP with
ASN.
40. Operational locality groups manage referrals and allocation of resources,
including ISP placements (localised decision-making)
41. All secondary schools will have enhanced the physical spaces within
school buildings and provided appropriate adjustments to accommodate
the sensory needs of all learners and staff.
42. Pedagogical approaches will be developed and applied to actively support
inclusive learning environments.
43. Schools can provide a staged level approach (Universal - Enhanced) for children
and young people with social, emotional, and behavioural needs.
44. An intensive level approach is provided to support those requiring an
intensive level offer, leading to a reduced number of CYP with SEBN
requiring independent special school placements.
45. AI tools that provide more responsive, tailored support for learners to meet
diverse needs.
Page 119 of 186

Page 120

Appendix 1
PKC - GENERAL
46. Automation of routine tasks to free up staff time, allowing greater focus on
direct support and relationship-building with learners and families.
47. Modernised workforce plan with roles aligned to current and future needs,
providing support for CYP with ASN and their families.
48. School leaders and staff clear on roles & remits of E&L staff providing
support
Page 120 of 186

Page 121

Appendix 1
PKC - GENERAL
Outputs delivered since last update
1. Support Staff (Pupil Support Assistants (PSAs)/Primary School Support Workers
(PSSWs)
PROJECT NOW COMPLETE
 Delivered a revised Core & Exceptional Staffing Standard and Allocation Model
for classroom based support staff.
 Reviewed and realigned PSA/PSSW staffing using the CYPP process to better
match identified need.
 Provided school leaders and staff with clear role definitions and remits for all
support functions.
Implementation: Full implementation across all schools from August 2026.
2. Career Long Professional Learning (CLPL)
Remains a core programme component with flexibility to adapt to emerging needs.
 Delivered an authority wide PSA induction programme outlining expectations,
essential training, and a structured start to role.
 Expanded training opportunities, increasing overall staff participation.
 Delivered 36 courses with 859 attendees.
 Supported 13 staff to achieve a Postgraduate Certificate in Inclusive Practice.
 Delivered an annual ASN Learning Programme accessible to all staff.
 Agreed structured career progression pathways (PSA, CLA, CLW).
3. 16+ Transitions
 Deployed the Compass App across all secondary schools to strengthen
postschool transition planning.
 Completed forecasting and gap analysis for intellectual disability, further
education, and employability pathways.
 Developed Transition Guidance for schools.
 Undertook extensive partnership and pathway mapping to align services and
strengthen transition routes.
4. Reviewing Service Level Agreements (SLAs) - Speech and Language Therapy
PROJECT NOW COMPLETE
 Completed redesign of the PublictoPublic contract with NHS Tayside,
establishing a clearer and more transparent funding framework for ELC and
school based need.
 Reduced/revised contract costs to support delivery of a trainthetrainer model.
5. Data Informed Decision Making (DIDM)
 Designed and fully rolled out a new Power BI dashboard enabling colleagues to
track, monitor and plan inclusive practice.
Page 121 of 186

Page 122

Appendix 1
PKC - GENERAL
 Developed and issued updated guidance and training to support confident use
of the dashboard and strengthen universal offer planning.
6. Inclusive Environments (ELC-Primary)
PROJECT NOW COMPLETE
 Established communication enabling environments where almost all children,
young people, staff, and families feel safe and able to learn.
 Implemented an enhanced P1 support model with specialist training to
strengthen early identification and inclass support.
 Invested £15.7k in sensory resources with practitioner guidance to ensure
purposeful and regulation focused use.
 Provided new communication boards to all primary schools to support inclusive
communication and reduce frustration.
 Purchased and rolled out Boardmaker across all schools.
 Produced recommendations on:
a) Early intervention to reduce demand and escalation
b) Inclusive classroom environments (Learning Spaces, Experiences &
Interactions)
c) Supporting parents
7. Intensive Level Support
 Opened new ISPs in August 2025 at: Perth High School, Kinross High School,
and Viewlands Primary School.
 Progressed Phase 2 consultation to create two further ISPs at Auchterarder and
St John’s RC Academy (from August 2026).
 Relocated the Connections (SEBN) service to PGS.
 Rolled out CALL Scotland toolkit to all primary ISPs.
 Implemented the new TAS4 job profile with grade uplift for ISP PSAs.
 Added three additional ISP classes (two primary, one secondary) to meet
sensory profiles
8. Multi-Agency Support (GIRFEC)
 Completed Inclusion Support Staff whole system review
9. Locality Resourcing Model
 Established Operational Locality Groups
 Created the foundations for a Single Locality Referral and Decision Making
System
Page 122 of 186

Page 123

Appendix 1
PKC - GENERAL
Project Name
2. AI and Automation
Project Description
This programme will be designed to position PKC at the forefront of digital
transformation and align with our overarching goal to leverage cutting-edge
technology to drive efficiency, enhance service delivery, and foster innovation across
all facets of our operations.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Alan Taylor (Programme Manager Steven
Watt)
Project Manager Chris Wright
Current Project Timeline
 Project start date 01/11/2024
 Planned project completion date 31/03/2028
Current status of the Project
Since the previous committee update in May 2025, the Strategic AI & Automation
Programme has moved from early foundation activity into a more mature delivery
phase. Over this period, the Council has established the core governance, policy, and
delivery arrangements needed to support responsible adoption of AI and automation,
while also progressing practical implementation across priority areas.
The programme is now focused on three main areas of delivery: scaling Microsoft 365
Copilot to support workforce productivity, progressing transcription capability for
professional services, and developing digital front door / customer contact
opportunities where AI may improve access and service responsiveness. This work
continues to be taken forward on a phased basis, balancing innovation with
governance, compliance, and organisational readiness.
Alongside technology delivery, substantial progress has been made in building the
wider foundations required for sustainable adoption. This includes strengthened
governance, the development of a clear strategic roadmap, structured engagement
with services and strategic leads, and a growing focus on benefits realisation, AI
literacy, and change support. The programme is therefore now in a stronger position
than at the time of the previous report, with the emphasis moving from initial setup
toward controlled scale-up and embedding capability more broadly across the
Council.
Page 123 of 186

Page 124

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
Operational Efficiencies and Scalability: By automating routine tasks, PKC
not only achieves operational efficiencies that benefit residents, businesses,
and partners but also enhances our ability to scale service delivery efficiently.
This strategic use of AI and automation enables us to meet the growing
demands of our communities without the necessity of increasing our
headcount.
Enhanced Decision-Making: With AI's predictive capabilities, we can make
more informed decisions that are data-driven and outcome-focused.
Innovation and Growth: The integration of AI can foster a culture of
innovation, encouraging the development of new services and solutions that
benefit all stakeholders, including businesses and partners.
Community Resilience: AI can enhance the ability to respond to and recover
from events, ensuring that services remain robust and reliable for the
community, businesses, and partners.
Economic Development: AI insights can aid in understanding the local
economic landscape, helping to attract, retain, and grow businesses within
the community.
Collaborative Partnerships: AI can facilitate better collaboration between
local government, businesses, and partners by providing a platform for shared
data and insights, leading to more cohesive and integrated service delivery.
Outputs delivered since last update
Since the last update, the programme has delivered several significant outputs which
together represent a substantial strengthening of the Council’s AI capability. These
include the establishment and operation of core governance arrangements, the
implementation of supporting policy and guidance, the rollout of a corporate AI
register, and the development of a more structured assurance approach around data
protection, risk, and responsible use.
A major area of progress has been the Microsoft 365 Copilot pathfinder and wider
adoption activity. This has moved beyond initial exploration into a more structured
programme of onboarding, support, measurement, and benefits tracking. Evidence
gathered through programme reporting shows that the deployment is now supported
by both user feedback and usage analysis, providing a clearer basis for future scale-
up decisions.
The programme has also delivered important organisational outputs in relation to
skills and culture. AI literacy materials have been made available to staff,
communications and engagement activity has increased, and the AI Hub is under
development as a central point for learning, support, guidance, and participation.
These outputs are helping create the conditions for broader, safer, and more
confident adoption across services.
Page 124 of 186

Page 125

Appendix 1
PKC - GENERAL
In addition, practical pilot and discovery work has progressed in priority service areas,
particularly around transcription and customer-service-related opportunities. Early
pilot activity has moved into a more evidence-based next phase, with the organisation
now better placed to determine where tools should be scaled, refined, or routed
through further governance and business case work.
More broadly, the programme now has a stronger and more coherent strategic
narrative than at the time of the previous committee report. This is reflected in
roadmap, board, and member-facing update materials produced since summer 2025,
which show clearer articulation of the programme’s priorities, benefits, governance
position, and next steps.
Page 125 of 186

Page 126

Appendix 1
PKC - GENERAL
Project Name
3. ALEO's Review
Project Description
To find the best model of delivering leisure and culture services to people across Perth and
Kinross within the current financial climate.
To recommend the delivery model best suited for ALEOs in future that is capable of:
 Optimising PKC investment in leisure and culture services.
 Increasing back-office efficiencies, including with other partners where
appropriate (for example Perth and Kinross Heritage Trust, Pitlochry Festival
Theatre).
 Growing and diversifying new income streams.
 Recommending an appropriate constitutional/governance structure for any
new delivery model on the basis of options appraisal (sole member, SCIO,
mutual etc).
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Charlene Guild
Project Manager N/A
Current Project Timeline
 Project start date 23/08/2024
 Project completion date 31/03/2026
Current status of the Project
PROJECT NOW COMPLETE
Since the last project update, a final report was presented to full Council on 29 October 2025
which set out the findings of the detailed options appraisal exercise undertaken by external
consultants EKOS (in partnership with Creative Services Scotland and Integratis). These
options considered the following structural models for ALEO’s in future:
1. Bring all ALEO’s in house to PKC
2. Bring some ALEO services in house (e.g. consolidation of corporate services from ALEO’s
delivered by PKC) and ALEO’s retain own identity / library services brought back into PKC
3. Create one new ALEO / two new ALEO’s – streamlining corporate and back-office services
Page 126 of 186

Page 127

Appendix 1
PKC - GENERAL
4. Create one ALEO for culture and sport and considering possible change of status for Perth
Theatre & Concert Hall
The key conclusion from the options appraisal report was that no disruptive structural
change (e.g., bringing ALEOs in-house, mergers, reconfiguration) should be pursued at this
time, because the options assessed did not demonstrate a clear financial benefit once
implementation/disruption costs and risks were accounted for. However, the report did
make a series of recommendations for more collaborative working moving forward as well as
the opportunity for shared services and cost efficiencies. Full Council approved the:
 establishment of a Strategic Alliance between PKC, Culture PK, Live Active Leisure,
and Perth Theatre & Concert Hall.
 progression of operational measures/workstreams (e.g., income growth, shared
services collaboration, workforce planning, procurement/efficiency opportunities,
and property rationalisation considerations).
 Annual reporting back to full Council from October 2026 on
progress/achievements/actions from the Strategic Alliance.
There were also two additional requests for further work to be completed in the following
areas before the project concluded:
1. Consideration of the alternative option to bring all the library services in house to
PKC. This has been included within the wider Libraries Review and will be reported on
as one of a series of options for the future of libraries to full Council on 17 June 2026.
2. Further development of a Terms of Reference for the proposed Strategic Alliance to
be reported back to full Council early in 2026.
A further paper was presented to Council on 25 Feb 2026 for approval of the Strategic
Alliance Terms of Reference (ToR), developed in response to request above. The ToR is
intended to:
o provide the formal partnership framework,
o enable the Alliance to commence joint planning from 1 April 2026, and
o begin implementing the sustainability/efficiency recommendations from the
Options Appraisal.
The first meeting of the Strategic Alliance was held in March 2026 to develop and agree the
Memorandum of Understanding (MoU) which will sit underneath the ToR and set out how the
SA will work in practice (meeting arrangements, responsibilities, decision-making, etc.).
Page 127 of 186

Page 128

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Ensure a sustainable model of delivery of leisure and culture services in future
2. A more streamlined and consistent approach across all ALEO organisations in terms
of systems and corporate support
Outputs delivered since last update
1. Report to full Council on 29 October 2025 setting out the findings of the options
appraisal exercise.
2. Further work to establish the Strategic Alliance Terms of Reference which was
presented to full Council (and approved) on 25 February 2026.
3. Additional option (all library services inhouse to PKC) to be considered and costed. This
has been picked up through the Libraries Review and will be reported to full Council in
June 2026.
Page 128 of 186

Page 129

Appendix 1
PKC - GENERAL
Project Name
4. Automation within People & Culture
Project Description
Automation within People & Culture – A ‘Power Automate’ story - Automation of emails to
manager with management information relating to employees. This could be employees who
have hit absence triggers or require a PDD review etc
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Greg Boland (Pauline Johnstone)
Project Manager Allan Craik
Current Project Timeline
 Project start date 19/01/2026
 Planned project completion date 31/12/2026
Current status of the Project
The project is progressing well, with all workstreams currently on track. Delivery remains
aligned with the agreed scope, timelines, and intended outcomes, and there are no risks or
issues at this stage that threaten the successful achievement of the project’s core objectives.
The project formally commenced on 19 January 2026 and has so far been focused on
establishing the required data, information, and technical infrastructure to support delivery.
This foundational work is now well advanced and providing a strong platform for the
subsequent phases of implementation.
As at 31 March 2026, six Power Automate flows are ready and awaiting go live approval. A
further four flows are currently in formal testing, with an additional eight under active
development. Overall progress remains positive, and the current pipeline reflects steady
momentum towards full delivery.
Page 129 of 186

Page 130

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Automation ensures that managers and People & Culture teams receive timely,
accurate and relevant information about their workforce, enabling earlier
intervention, more consistent decision making, and better support for employees.
This shifts the organisation from a reactive manual monitoring to proactive,
intelligence led.
2. By automating key HR, Payroll and employee notification processes, the programme
reduces time spent on low-value, repetitive tasks. This frees up capacity within HR
and Payroll and managerial roles to focus on more value added tasks, relationship
building, and improved service delivery.
3. Automated alerts and task generation ensure essential actions - such as absence
management, PDD reviews, pension communications, working time regulations,
onboarding/offboarding steps etc are completed consistently and on time, reducing
organisation risk and supporting governance
4. Employees and managers benefit from clearer, faster, and more predictable
communication across their employment lifecycle. Automated processes reduce
uncertainty, prevent missed deadlines, and support smoother onboarding,
performance, wellbeing and exit journeys
5. Automation removes variation caused by inconsistent manual handling of workforce
information.
6. Through the development of guidance, templates, flow standards, governance, and a
scalable automation framework, the programme establishes a long-term foundation
enabling further automation across PKC. This increases digital maturity and supports
the council's wider transformation strategy
7. By automating the capture of summarisation of key workforce indicators (such as
absence triggers), PKC gains clearer understanding of trends, hotspots, and emerging
issues. This enhances strategic planning, targeted interventions, and evidence-based
decision making.
Outputs delivered since last update
The project is still at an early stage of development. As we continue to design and build the
initial flows, we are also identifying and establishing additional automation opportunities that
could be of wider benefit to the People and Culture service. These emerging flows have the
potential to significantly reduce manual handling, streamline processes, and deliver greater
efficiencies, allowing teams to focus more on value added activity rather than administrative
tasks.
Page 130 of 186

Page 131

Appendix 1
PKC - GENERAL
Project Name
5. Business Systems Management Efficiency &
Rationalisation Project (BSMER)
Project Description
This project will review all Council business systems / Applications, describing how they are
currently managed; resourced; supported and developed and make recommendations on the
design of a new Digital operating model to support delivery of modern Council Digital
Business.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Alan Taylor
Project Manager Dave Turner
Current Project Timeline
 Project start date 01/06/2023
 Planned project completion date 31/03/2026
Current status of the Project
The project is currently in its closure phase and will formally conclude on 31 March 2026.
A single, governed Application Master List has been established and is operational, providing
an authoritative view of Council business systems including ownership, contract status,
costs, and lifecycle stage.
A defined application lifecycle and decommissioning framework has been developed and
applied to support structured decision making for both procurement and system retirement.
This framework has been used to support the decommissioning of applications during the
past year.
Reporting capabilities have been improved with the implementation of Power BI Dashboards
that help facilitate FOI requests, spend analysis and portfolio-level oversight.
The Digital Partnership team has been created to take forward some of the outcomes from
this project including the introduction of a new operating model for the optimal delivery of
modern digital business services.
Page 131 of 186

Page 132

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. To create a detailed picture of how people / resources are allocated across the
organisation supporting Council business systems and clarify total cost of ownership
for business systems and associated capital / revenue budgets.
2. To create a Business Capability Model describing how Business systems collectively
deliver on Council objectives.
3. Introduce a new operating model for optimal delivery of modern digital business
including: a revised Business Relationship and Business Partnership Agreements
between services and IT; a defined model / approach for decommissioning / retiring
Business systems.
4. Improve records management compliance.
5. To create a detailed picture of all contracts associated with all business systems
capturing all key procurement and contract information, allowing for better contract
management in the future.
Outputs delivered since last update
 System Manager and Principal User engagement sessions completed to enhance the
quality and completeness of the Application Master List.
 A complete and accurate inventory of Council business systems and applications has
been documented.
 Improved contract remediation, licence optimisation, and retirement of obsolete
systems achieved.
 Progress made on the Flare replacement, with PKC IT taking forward development of
an internal solution for Regulatory Services.
 Support provided to requirements gathering for the replacement of Glamis.
Page 132 of 186

Page 133

Appendix 1
PKC - GENERAL
Project Name
6. Customer Services Transformation
Project Description
To develop a new model for customer services by adoption of a customer-centric approach to
customer contact management which will substantially simplify our current arrangements;
enrich jobs and empower customer service staff to satisfy most requests at first point of
contact. The model will provide the opportunity to blend digital customer channels, assist
vulnerable citizens by an appropriate channel, operate more effectively in and across
localities, to achieve more with less resources, less effort, and less bureaucracy.
Project governance structure
Executive Sponsor Alan Taylor
Senior Responsible Owner (SRO) Steven Watt
Project Manager Liz Colledge
Current Project Timeline
 Project start date 01/10/2024
 Planned project completion date 31/03/2027
Current status of the Project
Phase 1 has been fully completed apart from Housing Service functions which were paused
due to a review in locality working and fairer futures for all.
Phase 2 of the project has focussed more on our approach to delivery of customer services
and while it will be delivered as an individual project, it will be dependent on the wider
cultural change programme being delivered through other areas such the Leadership Phase 2
project.
New Customer Service Charter, Vision, and Standards have been drafted and will be
implemented on 1 April 2026.
Work on Customer Insights has commenced and this will be the main focus of the coming
months.
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Consolidation of Dispersed Customer Services
2. Delivery of recurring revenue savings
3. Improving access to Council services for our customers
4. Develop draft revised customer service strategy
5. Develop draft revised customer service standards
6. Develop Customer Insights dashboard
Page 133 of 186

Page 134

Appendix 1
PKC - GENERAL
Outputs delivered since last update
All non-housing customer service related functions including Housing Repairs have been
consolidated into the 2 customer solutions hubs.
Savings have been delivered as planned for both the solutions hubs.
New Customer Service Charter, Vision, and Standards have been drafted and will be
implemented on 1 April 2026.
Page 134 of 186

Page 135

Appendix 1
PKC - GENERAL
Project Name
7. Employability Service Review Project
Project Description
To develop an implementation plan to deliver a strategic and co-ordinated employability
service for PKC. Designing a new model that makes best use of the current expertise, skills,
and resources to ensure a more cohesive and effective service. This will involve maximising
the reach and impact of our collective resources and delivery of services and operating in a
more connected and integrated way putting people and their needs at the centre of the
redesign.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Serge Merone
Project Manager To be confirmed
Current Project Timeline
 Project start date 01/08/2024
 Planned project completion date – to be confirmed
Current status of the Project
The initial phase of this project - to develop an implementation plan to deliver a
strategic and co-ordinated employability service for Perth and Kinross Council – has
been completed and identified actions in the plan have been delivered or are being
delivered. The scope and desired outcomes for Phase 2 are currently being finalised,
it is anticipated these will focus both internally on the delivery of the plan and,
externally on the wider offer of Employability services across Perth and Kinross linking
to the wider skills development.
Page 135 of 186

Page 136

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Through maximising the reach and impact of our collective resources, we will provide
a more integrated and effective offer for clients/individuals looking for support to
upskill and access employment.
2. That we operate in a more connected, integrated way, considering all the resources
(people and financial) at our disposal.
3. We will provide a more integrated and effective offer for local businesses looking for
support with recruitment and skills development.
4. We will ensure we use data, intelligence, and analytics to better inform decision-
making and target services.
Outputs delivered since last update
1. Review of the structure within Economy, Development and Planning to improve locality
working and internal and external synergies
2. New Board set up to drive Phase 2
3. Scope for Phase 2 has been drafted
Page 136 of 186

Page 137

Appendix 1
PKC - GENERAL
Project Name
8. Fairer Communities for All Model
Project Description
The "Fairer Communities for All" model focuses on creating inclusive, equitable, and
sustainable communities where everyone has access to essential services and
opportunities. This model ensures that:
 all community members have a voice in decision-making processes and access to
service and resources.
 there is fair access to healthcare, housing, education, and employment
opportunities.
 there is effective and strong partnership between communities, the council,
community planning partners, voluntary sector, and businesses to respond to and
address need.
 resilient communities are developed and sustained.
The overall aim of this model is to build sustainable communities where everyone can thrive
and live life well, free from poverty and inequality.
The model will knit together elements of the multi-disciplinary locality working (MDLW)
programme and our community engagement transformation project to strengthen the
efficiency and effectiveness of community engagement and empowerment across the
Council.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Elaine Ritchie
Project Manager
Current Project Timeline
 Project start date 06/11/2023
 Planned project completion date 31/03/2027
This project is intended to create the environment which supports a fundamental change in
our approach to delivering services to support our communities over the long-term. This
project (which establishes this environment) is scheduled to complete in March 2027;
however, the project outcomes will be delivered over the much longer term.
Page 137 of 186

Page 138

Appendix 1
PKC - GENERAL
Current status of the Project
Funding from the Fairer Communities for All scheme has been allocated to community
groups in the priority areas.
The Fairer Futures Project Team is now fully established to support and enable delivery and
SG funding has been secured for 26/27.
Fairer Futures focusses on the priority localities, chosen based on identified need from a data
and evidence led approach. Multi-agency workshops have been held in all 6 areas and will
continue.
The project has funded and commissioned lived experience focus groups and service user
interviews with individuals and groups from each of the six priority groups identified by
Scottish Government and across the 6 priority areas. Results from this consultation will help
to shape the actions and priorities for the multi-disciplinary action plans as well as informing
the next Child Poverty delivery plan.
A Power BI dashboard has been developed for Fairer futures which brings together a number
of datasets at intermediate datazone level allowing the user to access a wide range of
information about the priority areas or any other area of Perth & Kinross. This tool is available
to share with community groups and members which can help assessing need and
completing funding applications. The SG Fairer Futures team have highlighted this as an
example of best practice to other partners
Each area has an identified lead in place who is co-ordinating efforts to work collaboratively
to improve life chances for those communities, with a particular focus on employability and
skills, income maximisation and mitigating the impact of cost of living – the three main drivers
of poverty. Draft action plans are in various stages of development. Work will continue to
engage key local community organisations to help understand the local context and develop
community led solutions, alongside those which services can deliver.
Updates by area:
Letham
 SLA for usage of space in the hub for ‘one-stop shop’ initiatives for services in place
 Multi-disciplinary team meeting regularly and action plan in place
 Engagement with ADP and iDART to provide services including recovery café as asked
for by Love Letham
 Community Listeners project led by Kenny Ogilvy HSCP training the members of the
community and staff members of low-level mental health awareness and
conversational training
 Pilot in the Hub peer support group by Kith and Kin to support Kinship carers
 Improvements to street lighting and road safety being implemented following
community feedback
Rattray
 One of the first issues identified is the lack of a community hub. Meeting to discuss
potential use of Community Connect building organised
 Partnership with Blairgowrie and Rattray football club to provide community drop in
space in the meantime, with laptops provided for supporting CV writing, job
applications etc
Page 138 of 186

Page 139

Appendix 1
PKC - GENERAL
 Supported recent mental health event in Blairgowrie town hall in response to recent
spate of suicides, closer links established with mental health services
 Thematic workshop planned to investigate drug use and its associated issues in
Rattray
Coupar Angus
 Community action plan is coming to the end of its 3 years, opportunity to take stock
and see where Fairer Futures can dovetail with this.
 Fairer futures funding used to secure space for services and support the Strathmore
Hub
 Also funded community spring gala, attended by 240 people and marketing campaign
for Coupar Angus cares – all of which promotes community cohesion
 Community ownership meeting planned for end of April
Crieff
 First joint workshop with services and community groups held in February, Members
identified for a multi-disciplinary group
 Crieff ‘better place to live’ fair planned for June in community campus
 Lots of disparate groups in Crieff so work underway to try and bring these together,
some nervousness around just creating another group
 Need for property asset review in Crieff
 Possible pilot area for transport project through Anti-poverty task force subgroup
Muirton/North Muirton
 Multi-disciplinary team established and meeting monthly. Action plan in place.
 Four thematic workshops planned for the year, first one around no wrong door already
delivered
 North Muirton Connect project started by community group, but supported with
funding of laptops and printer from Fairer Futures funds to help with digital skills and
access classes, CV writing, job applications etc
 SLA in place for services to use North Muirton Community centre
Highland
 Initial workshop went well with really good engagement and attendance.
 Working to narrow the focus to specific areas and issues in Highland using the data
and feedback from the workshop
 Key themes, transport, childcare, accessibility to services, employment and insecure
work, stigma with drug use and mental health services.
 Planning and data gathering in progress for workshop 2. Planning for this to be
complete in the start of May.
Finally, Scottish Government plans for 2027 are to bring Fairer Futures and the Whole Family
Wellbeing work together. We already work closely together in PKC and are developing a plan
from closer and more streamlined governance of these 2 workstreams and the poverty work,
potentially with one oversight board replacing the existing 3 where membership overlaps
considerably.
Page 139 of 186

Page 140

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Stronger relationships with our communities, creating a shared sense of purpose.
2. Deliver services to communities in need through a focused and targeted approach.
3. Deliver services that are more responsive to the needs within local communities, and
to work together in partnership to address them with a clear focus on early
intervention and prevention.
4. A collaborative approach to meet the needs of local communities, shifting resources
to meet needs.
5. Continuing to tackle discrimination and prejudice, promoting equal opportunities for
all, creating a fairer Perth & Kinross
6. That decisions at a locality level are based on evidence and are made collaboratively,
working with all stakeholders, including Elected Members resulting in streamlined
levels of bureaucracy.
Outputs delivered since last update
1. Data profiles utilising PowerBi created for all 6 priority localities.
2. Joint service workshops held in Muirton / North Muirton, Coupar Angus, Rattray, South
Crieff, Letham and Highland.
3. Locality lead in place for all 6 areas.
4. Community consultation carried out in Letham to identify community priorities.
5. Draft action plans in place for Letham and North Muirton.
6. Action plan to address public realm issues in place for Rattray and multi-agency
working group are delivering and monitoring this.
7. Multi agency team established for North Muirton and meeting regularly to review
progress and identify emerging issues.
8. Community bases to enable joint service delivery and enable community engagement
identified in Letham, Rattray, Coupar Angus, North Muirton and South Crieff, with
supporting SLAs in place where required.
9. Focus groups and interviews to collate lived experience and parental engagement
programme currently being delivered.
10. Fairer Futures Funding secured for 2026 / 27 and Project Team in place.
Page 140 of 186

Page 141

Appendix 1
PKC - GENERAL
Project Name
9. Improving Health & Wellbeing and Attendance in the
Education Workforce
Project Description
To develop a Health and Wellbeing Strategy for the Education workforce. This will include the
development of appropriate supports such as coaching and supervision for targeted groups
of staff; a programme of CLPL which supports health and wellbeing; augmenting the
corporate wellbeing offer to ensure that it meets the needs of the education workforce both in
terms of content and mode of delivery as well as developing communication approaches
which ensure that the education workforce is fully informed and engaged and feels that they
have a voice which his being listened to.
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) David Macluskey (Susie Turner)
Project Manager Morag Charity
Current Project Timeline
 Project original planned start date 01/05/2025
 Actual start date 16/09/2025
 Planned project completion date 27/11/2026
Current status of the Project
The project is progressing with workstreams on track supported by a ‘consultative steering
group’ of staff, officers, and union representatives. Following an information gathering and
analysis stage, action research with key stakeholder groups is underway and set to continue
until May. This use of direct feedback or ‘voice’ from education workforce participants aims to
support how the accumulated feedback is being used to inform and direct improvements.
Specific achieved outcomes to date include identification of initial improvement areas in
response. For example, the creation of accessible EDMS resources signposted to the
education workforce via direct links from the Education & Learning site, review of the current
support and supervision offer to support self-referring education staff and consideration of
the impact of differing illness categories on staff health, wellbeing and attendance, and
where improvements to contracted services to the school estate can support.
Intersectionality with other project/programmes has been identified. This has led to closer
working with other internal service areas with collaborative work relating to redesign and
refresh of existing supports ongoing to support the project outcomes.
A planned mid-point review of initial project improvements within communications is in
process. Due to the time-limited nature of the project, final reporting is planned to be
delivered by the agreed completion date in November 2026, with implementation of
outstanding recommendations to follow.
Page 141 of 186

Page 142

Appendix 1
PKC - GENERAL
Page 142 of 186

Page 143

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Enhance staff health and wellbeing by improving the levels of health, wellbeing and
engagement that are self-reported by the Education Workforce in the Employee
Survey.
2. Increase clarity on the reasons for absence and low levels of self-reported health
and wellbeing by the Education Workforce across Educational settings.
3. Boost PKC workforce attendance by improving attendance rates in the Education
Workforce.
4. Strengthen support systems by identifying effective ways to improve the health,
wellbeing, and attendance of the Education Workforce.
5. Target wellbeing interventions for staff groups most at risk, based on attendance
trends and self-referral.
6. Build staff capacity through a programme of Career Long Professional Learning
(CLPL) focussed on health and wellbeing support relevant to the Education
Workforce.
7. Optimise resources by reducing supply costs through improved absence
management.
8. Improve absence management practices by refining frameworks, policies, and
processes to align to Education Workforce needs and context.
9. Establish strategic direction by launching a Health and Wellbeing Strategy for the
Education Workforce
10. Retain talent and support succession planning by improving staff retention across
all roles and experience groups in the Education Workforce
11. Strengthen recruitment outcomes for the Education Workforce by increasing
success in filling teaching and non-teaching vacancies.
12. Foster engagement by improving communication to and with the Education
Workforce
13. Demonstrate PKC Corporate Plan Priority through the supporting and promotion of
the physical and mental wellbeing of the Education Workforce
14. Demonstrate PKC Corporate Plan Priority through strengthening our commitment to
enabling our children and young people to achieve their full potential by
stabilisation of staff absence, retention of talent and resource optimisation.
Outputs delivered since last update
1. Consultative group established, made up of key stakeholder representatives across
education, professional association/union and internal service areas.
2. Action Research process in two school settings ongoing alongside key central
education workforce stakeholders.
3. Short Life Working Group (Workload) established, made up of education and education
union stakeholders. All PKC schools Local Management Groups invited to participate,
exploring current key challenges and possible local solutions to workforce health,
wellbeing, and attendance.
4. Initial actions taken forward include specific resource developed in response to an
identified gap (Short Life Working Group - Workload).
5. Identification of areas of environmental improvement alongside internal stakeholder in
other service areas, Contracts and Facilities, Property – with potential to support
health, wellbeing, and attendance of education workforce.
Page 143 of 186

Page 144

Appendix 1
PKC - GENERAL
6. Identification of areas of intersectionality with other project/programmes, specifically
Additional Support Needs (ASN), AI Project, and the Customer Services Transformation.
Areas of potential joint working have been highlighted to the SRO’s, the Project
Management Officers, and Education and Learning senior management team for
consideration.
Page 144 of 186

Page 145

Appendix 1
PKC - GENERAL
Project Name
10. Leading: Our People, Our Purpose
Project Description
The project, rebranded from Leadership Review Phase 2, is now established as Leading: Our
People, Our Purpose. Its aim is to strengthen leadership capability, embed cultural and
behavioural change, and drive service improvement across the organisation. The project has
three core workstreams: Culture & Behaviours, Business Improvement, and Workforce
Planning.
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Greg Boland
Project Manager (Business Improvement) Allanah O’Brien
Current Project Timeline
 Project start date 01/10/2024
 Planned project completion date 31/03/2027
Current status of the Project
Discovery Phase.
1. Culture & Behaviours
 Delivery of Facilitation and Design Academy for internal staff late December
 Dates in the diary with our Growing Our Leadership Potential cohort to share with
them the Leadership Development Strategy as they co-designed it and have
courageous teams’ sessions booked in so they can experience the new look and feel
training and give feedback. 
 Improving managers induction, with all new managers have access to 3 coaching
sessions within the first 6 months and Connections Events starting in Spring 2026. 
 Developed and presented the Leadership Development Strategy at a number
of forums and sharing with SLT on the 12 February to get senior leadership buy-
in.  Additional resource (PR9 Business Improvement) from 30 March 2026.
 Collaborative pilots with NHS Tayside (new cohort start 16 Feb), the Improvement
Service, and Perth Leadership Academy (New Cohort started on the 26 January) are
going well, and we plan to expand partnerships regionally. 
 The Leadership Forum on 5 March 2026 focussed on budget, transformation
and supporting people through change / resilience.
 Future Voices Forum launched on 5 March
2. Workforce Planning
 Strategic Leads actively progressing three to five year workforce plans with support
from Organisation and Workforce Change Team. Most areas have now completed
workshops and submitted first drafts. We continue to provide targeted support,
particularly around strengthening KPIs, and several plans have now been finalised.
Page 145 of 186

Page 146

Appendix 1
PKC - GENERAL
 Supporting our “Grow Our Own” priority, Career grade structures and support for
employee learning guidance is complete and will be issued shortly, pending final
system development to host this. (My-view)
 Workforce Planning Toolkit is in development, shaped directly by feedback from
services and will be refined further as the 3–5-year plans progress.
 Ongoing collaboration with Dundee and Angus on HSCP workforce planning to share
data, insights, and resources.
3. Business Improvement
 Continued review of Professional & Business Support Phase 1, to complete Lessons
Learned for Phase 2.
 Business Improvement / Service Design ‘framework’ created in order for completion
with PBS SMs.
 Awaiting follow up conversation with service to drive this forward.
Although there has been progress across 3 workstreams, the project is currently on hold
pending clarification and agreement of the revised scope with the Executive Sponsor.
Agreed Project Outcome(s)
The agreed outcomes of Leading: Our People, Our Purpose are strengthened leadership
capability, embedded positive culture and behaviours, improved service performance, and
more strategic alignment of workforce, resources, and operating models with organisational
priorities.
Outputs delivered since last update
Project establishment, governance & mobilisation
· Regular Sponsor Reports
· Steering Group meetings
· PMO requirements – Project Monitoring sheets
Development of a Leadership Proposition, structured around:
· Aspiring Leaders
· Enabling Leaders
· Evolving Leaders
Workforce Planning workstream
· Submission of draft workforce plans to March 2026 across services
· Alignment of workforce planning activity with leadership development and organisational
priorities, rather than stand-alone workforce exercises
Business Improvement workstream
· Initial scoping and prioritisation of improvement activity linked to wider transformation
dependencies (e.g. Professional & Business Support, Property Services)
· Application of project management and improvement governance to priority areas to
improve consistency and accountability
Page 146 of 186

Page 147

Appendix 1
PKC - GENERAL
Project Name
11. Perth Secondary Estate Review
Project Description
Education is integral to delivering our corporate priorities relating to children and
young people, the wider health and wellbeing of people in Perth and Kinross and
meeting our climate change/climate justice obligations. This project will consider
how the Secondary Learning Estate in Perth City facilities are best aligned with the
corporate priorities.
Project governance structure
Executive Sponsor David Macluskey
Senior Responsible Owner (SRO) John Beveridge
Project Manager Brian Reid
Current Project Timeline
 Project start date 01/10/2024
 Planned project completion date 30/06/2028
Current status of the Project
Ongoing – Demographic analysis of future secondary demand underway, the project is now
undertaking technical option appraisals for Perth Secondary sites to identify what options are
the best fit for meeting future secondary school needs.
Agreed Project Outcome(s)
The review will consider the following:
ensure the Perth City secondary learning estate is well aligned with service need and
corporate estate priorities.
 to improve operational efficiency of school facilities/community facilities.
Consider compliance with statutory carbon emission reduction targets.
 Consider future requirement for substantial investment in multiple buildings.
 Committee approved way forward
Outputs delivered since last update
Ongoing updated data gathering including latest roll projections, housebuilding projections,
condition surveys, engagement of technical consultants.
Page 147 of 186

Page 148

Appendix 1
PKC - GENERAL
Project Name
12. Public Transport in the Community
Project Description
To develop a plan for a transport model that meets the needs of all our communities which is
affordable, sustainable, efficient, and effective. This model will cover the provision of local
bus services, mainstream home to school transport, ASN home to school transport, HSCP
and children and families' transport.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Elaine Ritchie
Project Manager Margaret Roy
Current Project Timeline
 Project start date 01/04/2024
 Draft OBC will be complete 30/04/26 for internal consultation
 Final OBC presented to Full Council 02/09/2026
 Whole public transport network review start summer 2026
 Planned project completion date 31/03/2027
Current status of the Project
Year 2 of the project delivered on workstream actions that were identified and established in
Year 1, over all five workstreams. These are highlighted below.
As we move into the final year of the project, the project team, supported by the Passenger
Transport and Community Transport Consultants TAS Partnership Ltd, will complete an
Outline Business Case (OBC) by end of April and that will be circulated internally with the
final OBC then being presented to Full Council on 02 September 2026.
To further support this, we are continuing to ensure effective communication with key
stakeholders through events such as elected member briefing sessions, the Tayside Bus
Alliance, Community Transport Forum, and Public Transport Forum.
Once the draft OBC is complete, the project team and consultant will commence work on a
complete review of the public transport network across Perth and Kinross in terms of
preparing the local bus contracts that will be issued for tender in 2027 in light of all current
contracts ending on 31 March 2028.  They will also support the project team on a major piece
of school transport related work in reviewing and documenting all school transport pick up
and drop off points.
Page 148 of 186

Page 149

Appendix 1
PKC - GENERAL
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
A transport model that meets the needs of all our communities which is affordable,
sustainable, efficient, and effective. This model will cover the provision of local bus services,
mainstream home to school transport, ASN home to school transport, HSCP and children
and families’ transport.
Outputs delivered since last update
1. Free Local Bus travel continued on first Saturday of the month for the FY 25/26 and
there was an additional free travel day on Thursday, 19 June (for clean air day) and
Saturday, 20 December (to support local businesses). The free travel trial ended on
Saturday, 07 March 2026 and the project team are now working on a final report
detailing the outcome of the trial.
2. The Public Transport Survey closed in summer 2025 and attracted 796 responses. Nine
roadshows were then held throughout Perth and Kinross to gather more feedback from
the public. A Public Transport Forum has now been established and has held its first in
person meeting and its first online meeting in March 2026. All feedback from these
sources will be compiled and included in the OBC.
3. A video informing how to read a roadside bus timetable and travel on a bus service was
produced and published on the Council’s social media channels
4. Regular posts continue to be scheduled on the Council’s social media channels to
promote public transport during FY 25/26.
5. The Community Transport Group in Aberfeldy, Tay Valley Connections, were provided
with a Council owned MPVs to deliver local transport solutions in their rural areas,
earlier in 2026 and the official launch is expected to take place on 22 May 2026.
6. The project team have supported a new Community Transport Group in Glendevon to
commence operation, and they will be long term loaned the 8-passenger seat EV
vehicle that the PTU purchased with previous CBF monies. It is expected that they will
commence delivering journeys to their community as from summer 2026.
7. Further support was offered to the wider Community Transport Community in Perth
and Kinross by continuing the minibus disposal scheme and a further nine community
transport groups have now been provided to Community Groups making it twelve in
total since the scheme commenced. This initiative was featured in the Scottish
Government’s National Transport Strategy 5th Delivery Plan Report in March 2026.
8. To enable greater and more in-depth data monitoring of our contracted local bus
services to inform decisions about our local bus network, the PTU worked with IT
colleagues to produce a Power BI dashboard to this end. The dashboard is now
complete and in use. Ongoing testing is in place at the moment to resolve any
potential glitches or data errors.
9. In terms of Home to School Transport, the test of change in terms of a Council pool car
and Council employee delivering a mainstream home to school contract has been
completed and has been evaluated as has the CT group delivering a home to school
transport contract. A further test of change commenced in FY25/26 whereby PSAs
delivered ASN transport in a lease car. These have been evaluated against a
commercial operator undertaking these and which is the most effective model.
10. The Public Transport Unit worked with IT colleagues to design and produce a new
school transport database which is now in operation and allows a greater suite of
reporting and removes the need for duplication of pupil details entry. The improved
reporting will enable improved interrogation of data to inform possible efficiencies.
Page 149 of 186

Page 150

Appendix 1
PKC - GENERAL
11. A transport working group has been established between the project team and NHS
Tayside to identify potential for collaborative and more efficient transport to health.
12. The consultants have undertaken a route optimisation exercise on all Fairview School
transport contracts, and a tendering exercise will be issued in late spring 2026 to
establish options for transport efficiencies to the school in line with a revised whole
school end time of 1500 hrs. Consultation has taken place with the school in terms of
the revised school end date, and the response has been positive.
13. Benchmarking is complete on all other 31 LAs Home to School Transport Policies and
PKC policy is being updated for issue at start of new academic session 26/27. Noted
that there will be little change to the entitlement criteria as currently it is very little
more than what the statutory minimum allows.
14. The review of HSCP transport policy is completed and was benchmarked against other
LA’s policies where these were in place.
15. The consultants have completed reports on the following areas, and these will be
included in the OBC as appendices:
 Community Engagement
 Franchising
 Direct operations
 Depot costs (Aberfeldy, Perth)
 Community Transport
Page 150 of 186

Page 151

Appendix 1
PKC - GENERAL
Project Name
13. Strategic Procurement & Commissioning Project
Project Description
To design and implement a new operating model for strategic procurement and
commissioning to improve efficiency and optimise the value and benefits of our purchasing
power. Helping us to better align spend with need and address pressures of changing
demands. Optimising the public value of the procurement function and consolidated relevant
skills and expertise across the organisations.
Project governance structure
Executive Sponsor Thomas Glen
Senior Responsible Owner (SRO) Lisa Simpson
Project Manager
Current Project Timeline
 Project start date 16/01/2023
 Planned project completion date 31/03/2027
Current status of the Project
The Procurement and Commissioning Transformation project is a five-year programme of
works comprising of a number of different workstreams all contributing to the delivery of our
desired outcomes. The project is now entering its fourth year and details of outputs delivered
are described below. A project team is firmly established and is working closely with all
stakeholders to continue on the journey of transforming our procurement and strategic
commissioning.
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. An effective, outcome-focussed operating model for the procurement and
commissioning of goods, works, and services for the Council.
2. Council spending is better aligned with need and addresses pressures of changing
or increasing demand.
3. Where relevant, spend is based on an assessment of need, linked to the priorities
of the Council’s Corporate Plan and Strategic Commissioning Plan of the IJB as it
refers to services delivered by the HSCP on behalf of the IJB.
4. More effective strategic and financial planning by giving oversight and challenge as
to why, what, how and when the organisation spends/invests for the future.
5. Optimised the public value of the procurement function and where appropriate
consolidates relevant skills and expertise presently dispersed across the
organisation.
6. Supports innovation in terms of customer centred service design and delivery.
7. Creates market disruption/challenges monopoly markets.
8. Supports and promotes sustainable procurement and a circular economy model.
9. Supports and promotes community wealth building.
Page 151 of 186

Page 152

Appendix 1
PKC - GENERAL
10. Supports a whole life approach for procurement and commissioning capturing
specification design, market intelligence, commissioning processes, contract
management, delivery of outcomes, contract review, and future commissioning.
11. Identifies and creates opportunities for commercialisation/income generation.
Outputs delivered since last update
1. Digital Category Strategy developed:
 Action plan developed and approved. Delivery has commenced although
progress is slow due to resource restraints.
2. Schools Savings Working Group set up to work on delivering cost savings and
efficiencies across DSM. Completion of a number of mini projects under this including
Education materials product rationalisation and award of commitment contract.
3. Quick quote e-learning module live and accessed by 45 people. This has reduced
resource required by the procurement team as there is no requirement to deliver in
person sessions.
4. Business Partnering:
 Meetings are continuing with quarterly meetings taking place with Property. This
is a test of change and if successful we will aim to resource similar meetings
with other areas. The purpose of this is to develop proactive planning.
 Meetings continuing with Environment and Infrastructure to identify
collaborative opportunities across the service and Council. This will reduce the
number of contracts required. This includes working with Tayside Contracts to
identify where they could deliver requirements instead tendering.
5. Protecting our environment:
 The Sustainable Procurement Toolkit is being embedded within the procurement
process. This is being implemented with the support of the Climate Change and
Sustainability Team.
 Sustainable Procurement Training scheduled for May for 30 PKC employees.
This will allow further consideration of environmental factors within the
development of specifications and award criteria within tender documents.
6. Process Maps and Templates:
Initial discussions held with IT with a view to moving to e-forms for some templates.
Procurement are currently on the waiting list. Aim is to have smart forms that can be
used to build a data lake which can be used for data analysis and reporting.
7. Community Benefits
Community Benefits Working Group formed. Working to improve delivery of Community
Benefits to achieve greater social value through our contracts.
8. Integra Centros RSS Purchasing Module
Roll-out, let by RSS Project Team and supported by Procurement Team, complete.
Training and support handed over to Procurement Team.
Page 152 of 186

Page 153

Appendix 1
PKC - GENERAL
Project Name
14. Tayside Contracts Review
Project Description
To undertake a review of the way in which Perth and Kinross Council Interfaces with Tayside
Contracts, in terms of Governance arrangements, the role of elected members, procurement
of services, standardisation of offer. This review will be undertaken alongside Tayside
contracts own transformation programme to ensure that all possible benefits are realised
from this unique arrangement of co-ownership between Dundee, Angus and Perth and
Kinross, the 3 councils who co-own and fund Tayside Contracts.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO)
Project Manager
Current Project Timeline
 Project start date 01/11/2024
 Planned project completion date 31/03/2027
Current status of the Project
Overall, good progress has been made in terms of the project outcomes, providing greater
clarity as to roles and remits, scope of activities and identification of opportunities for growth.
A fact finding exercise was completed to:
 provide assurance that improvement actions identified via the independent review of
the Supported Self Assessment exercise were being progressed
 provide clarity and assurance re governance arrangements and identify actions to
improve communication with elected members
 Assess effectiveness of improvement actions to date
 Identify further areas for improvement
Agreed Project Outcome(s)
1. Elected members are clear on their role and the remit of the Joint Committee
2. There is an understanding of the finance, governance, and performance
arrangements, allowing assurance of effective and efficient partnership
arrangements through Tayside Contracts
3. Any additional business opportunities identified, are explored
Page 153 of 186

Page 154

Appendix 1
PKC - GENERAL
Outputs delivered since last update
 Revised GSG role and remit – to clarity re responsibilities and establish escalation
mechanisms
 Schedule of Approved works- provides clarity re role of Tayside Contracts
 Publication of committee papers online to improve transparency
 Series of engagement sessions with elected members / Q&A
 Performance dashboard implemented to improve transparency and scrutiny
for GSE and Joint Committee members
Page 154 of 186

Page 155

Appendix 1
PKC - GENERAL
Project Name
15. Whole Family Wellbeing (WFWB) programme
Project Description
The Whole Family Wellbeing (WFWB) programme has been established to implement the
Scottish Government initiative and associated Whole Family Wellbeing Fund). This initiative is
aimed at increasing the delivery of early intervention and prevention, focused on holistic
family support, when, where, and for as long as it is needed.
The WFWB programme aims to support an increase in universally accessible early help and
support, delivered where and when it meets families' needs. Aiming for a better collective
awareness of available support and how to access it, for both families and professionals, it
will aim to provide support as "joined up" and limit the number of professionals and services
individually involved with families. It will also look to provide families with choice about
support, ensuring they are involved in decisions that affect them and that there is increased
collaboration between services and organisations that support families (including adult
services and third sector).
The WFWB programme will encourage increased engagement with, and participation from
children, young people, and families in designing and developing services and support,
ensuring a clear and shared understanding of the needs of families across the whole system.
It will embed the key principles of holistic family support and early intervention and
prevention within structures and systems (stigma-free, needs-based, rights-led), encouraging
and empowering staff to develop innovative family support solutions in conjunction with the
families they support.
The WFWB programme will improve capacity within the workforce to respond to the needs of
families in a holistic way, through effective signposting and support.
Project governance structure
Executive Sponsor Jacqui Pepper
Senior Responsible Owner (SRO) Arun Singh
Project Manager Carol McAuley
Current Project Timeline
 Project start date 01/04/2022
 Planned project completion date 31/03/2028.
This project is intended to create the environment which supports a fundamental change in
our approach to supporting our families and communities over the long-term. This project
(which establishes this environment) is currently scheduled to complete in March 2028);
however, the project outcomes will be delivered over the much longer term.
Current status of the Project
The Whole Family Wellbeing programme is funded through the Scottish Government Whole
Family Welfare Fund, with funding being in place until the end of financial year 2026/27. The
Page 155 of 186

Page 156

Appendix 1
PKC - GENERAL
current WFWB budget (which was approved at CYPF Partnership in December 2026) uses
underspend from previous years to enable the continuation of some projects into 2028. This
longer timescale allows for an extended period in which to evaluate positive outcomes and
impacts, to plan for sustainability, and to mainstream funding for projects as appropriate.
The Programme has been focussed on the following general areas:
 Access and Availability - Improving awareness of, and access to services that support
families.
 Engagement with Children, Young People and Families.
 Service Design and Delivery: consideration of different ways in which additional
capacity to deliver holistic family support can be achieved.
 Systems Leadership and Collaborative Working.
 Support for the Workforce: looking at opportunities to share learning and good
practice, to identify and meet training needs within the wider community and promote
the principles of holistic family support.
This work has resulted in many areas of positive developments in supporting our families:
these are outlined in later sections of this document. Consultation with partners has also
identified additional areas for development in family support, including mental health,
addressing child poverty, and supporting families where a child has additional support needs.
Following the publication of the new Tackling Child Poverty Delivery Plan 2026-2031 (Bringing
Hope, Building Futures), SG have announced plans to bring together the Whole Family
Wellbeing Funding Programme with Fairer Future Partnerships and Whole Family Support
Early Adopter Areas into a single Whole Family Support system change programme from April
2027.  This does not impact on the existing WFWF funding allocation for 2026/27; however,
it is anticipated that 2026/27 will act as a transitional period to allow the new integrated
programme to be designed in collaboration with SG.
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. An increase in universally accessible early help and support, which is delivered
where and when it meets families' needs.
2. Better collective awareness of available support and how to access it, for both
families and professionals.
3. Support is experienced as "joined up", limiting the number of professionals and
services individually involved with families.
4. Families are provided with choice about support and are involved in decisions that
affect them.
5. There is increased engagement with, and participation from children, young people,
and families in designing and developing services and support.
6. The key principles of holistic family support and early intervention and prevention
are embedded within structures and systems (stigma-free, needs-based, rights-led).
7. There is increased collaboration between services and organisations that support
families (including adult services and third sector).
8. There is a clear and shared understanding of the needs of families across the whole
system.
Page 156 of 186

Page 157

Appendix 1
PKC - GENERAL
9. Staff are encouraged and empowered to develop innovative family support solutions
in conjunction with the families they support
10. There is an improved capacity within the workforce to respond to the needs of
families in a holistic way, through effective signposting and support.
Outputs delivered since last update
1. The Whole Family Support Directory of Services has been integrated into refreshed
GIRFEC guidance, with details of how to access services supporting families at a range
of different thresholds.
2. The Support and Connect training programme is a joint funded project (WFWF/CPAF)
with a key focus is on reducing the stigma around talking about money. Training for
front-line workers uses a social needs screening tool to develop skills and confidence
in being able to engage with families sensitively about money, understanding the wider
needs of families, providing improved referral pathways and increased awareness of
the range of support available for families. The training includes the use of the FORT
system as a referral pathway to integrated support. Over 100 individual users have
completed the Support and Connect training, across both public and third sector
organisations. In the recent WFWF Year 3 evaluation report, the programme was
included as a case study showing good practice in partnership working. Perth CAB are
currently developing a leadership training programme to support embedding the use of
the screening tool and the FORT referral system into systems and processes.
3 The FORT referral system continues to be rolled out across the area. Perth CAB is
coordinating the system, with 56 partners receiving and making referrals through the
system. In the first year, the focus was on the provision of financial and welfare
support, but this has been widened over the last year to include a range of support
partners including health, wellbeing, and employability. The Support and Connect
directory now has 209 individual services listed across Perth and Kinross and Tayside.
In March 2026, we reached the milestone of 500 referrals through the platform.
4. The Family Support Practitioner Network was launched on 23 October 2024 at an in-
person event at the Perth Civic Hall. During 2025/26, 5 network events were held with
topics including Supporting Challenging Behaviour, Protecting People, Physical Health,
Family Support and Housing. Over 130 professionals are members of the network,
with 30-40 attending each session. To support the Practitioner Network, the Padlet app
has been used to allow members of the network to share resources and information
about training opportunities.
5. The Family Advice and Community Connections Service (FACCS – delivered by
Aberlour) has been commissioned to screen, signpost and/or provide a flexible range of
supports to families requesting early help across Perth & Kinross. The service opened
to families in September 2024, and since then 152 families (comprising 436
individuals – parents and children) have been open to the service, with approximately
30-40 new families becoming open to the service each quarter. In the last 6 months,
31% of referrals came directly from families reaching into the service, with the
remaining 69% being supported by professionals to make a referral. The majority of
families that access support (87%) are within one of the Child Poverty “Priority Group”
categories set out by Scottish Government, with just over half being in more than one.
The highest proportion of families have primary-school aged children, and are often
supported with issues around routines, child behaviour, and development.
6. As part of the establishment of FACCS, Family Support and Community Workers have
undertaken extensive engagement and awareness raising across the whole of Perth &
Page 157 of 186

Page 158

Appendix 1
PKC - GENERAL
Kinross. They have attended community events, school activities (including Parent’s
Evenings and Parent Council meetings), mother and toddler groups, as well as directly
linking with service providers. This has allowed the team to identify and respond to
specific issues relating to different localities (e.g. transport difficulties, accessing
foodbanks, responding to health needs).
7. The Families Empowering Communities (FEC) team have established their provision in
Muirton, Bertha Park and Blairgowrie (in addition to existing provision in Letham and
Crieff). Throughout summer 2025, a range of activities were organised across the FEC
supported locations, including a summer carnival event in Muirton, and picnics in the
park in Letham and Blairgowrie. These events were attended by 54 families
(comprising 61 adults and 98 children), allowing for supported play and family
engagement, with food and snacks being provided for children and parents. Thematic
groups are also offered across all localities including wellbeing groups, support for
parenting, a dad’s only support group, and family play groups. These groups are offered
on an ongoing basis for many participants, allowing the FEC team to build relationships
with participants, but also developing peer support between parents and carers. 42
families regularly engage with the groups.
8. The FEC team also provide one to one support for parents within each of the localities.
The majority of referrals come from MASH, CP Duty Team, and Perth City Social Work
teams, but individuals are able to refer themselves to the service, although referrals are
restricted to residents of the supported localities. During the period April to September
2025, a total of 30 new families received one to one support from the service (in
addition to 7 families who were still open to the service from the period Jan – April. The
most common request for support is around parental health and wellbeing (including
mental health) and children’s mental health. Whilst the support provided by the team is
universal in nature, there is a focus on families who experience disadvantage in some
way. All families who are currently receiving one to one support fall into one of the
priority family categories outlined below, with many families being in more than one
category.
9. The Parenting and Family Learning Team (PFLT) have developed and delivered a range
of programmes that are part-funded through the Whole Family Wellbeing programme,
including Fearless Triple P (supporting parents whose children have anxiety), Teen
Triple P (helping parents’ confidence in dealing with challenging teenage behaviour),
Incredible Years programmes (strengthening parent-child interactions and
attachment), and ante-natal PEEP (supporting parents to bond with their child). During
the period April to September 2025, 69 parents attended these programmes (which
vary in duration) for support with a range of parenting skills. In addition to face-to-face
learning programmes, the team have been developing online delivery models for Teen
Triple P and Fear-Less Triple P (to support families who prefer to engage in this way
because of employment, childcare or transport difficulties). The PFLT team also
signposts parents to other service providers as appropriate, and many parents
progress between PFLT programmes as their child gets older, with the team providing
longer-term support where needed.
10. Additional training opportunities for training in PEEP Learning Together programmes
were provided through Element 3 national funding from WFWF, with training being
delivered by Peeple.  A total of 109 individuals have completed PEEP Training, with 25
staff and volunteers trained in the Antenatal PEEP programme. Staff have attended
from across 13 organisation including Culture PK, HMP Perth, Perth Autism Society,
Aberlour, Barnardo’s, Homestart, Madoch Centre, Riverside Church, and professionals
within social work and family support teams within Perth and Kinross Council. This
training allows professionals working with families at different stages and levels of
Page 158 of 186

Page 159

Appendix 1
PKC - GENERAL
support to be using consistent language and approaches to support child learning and
development and parental attachment.
11. The PFLT Team has also supported the roll-out of the NHS Speakeasy programme
within Perth and Kinross. This is a programme run by NHS Tayside which is aimed at
parents, carers, and youth-workers who support children/young people. The main goal
is to support positive, open, age-appropriate communication about growing up, sex,
relationships, gender, and safety. The PFLT team have worked in collaboration with
NHS Tayside colleagues to train 14 members of PKC staff in delivering the programme
more widely across the area.  A menu of “bitesize” sessions is available for parents
including drug and alcohol awareness, sleep, and adolescent brain development.
12. A Whole School “Togetherness” (previously Solihull approach) pilot has been
completed with Kinross High School. The training aims to help all staff better
understand pupils’ behaviour, and to understand the importance of relationships for
brain development,
By understanding their pupils’ behaviour, staff are better placed to help pupils
‘upregulate’ or ‘downregulate’ their emotional level in order to be in a better state to
learn. The model can also support staff to better understand the impact of adverse
childhood experiences on health and wellbeing. The PFLT delivered training to all staff
in the school in April/May 2025. Evaluation of the pilot is currently underway, with plans
to widen the approach over the next year.
13. The PKC COPE Team (who work with children on the edge of care) have been supported
by the WFWB programme to increase their capacity to support families at different
times across the day, with the number of referrals received by the team having doubled
from approximately 15 families to 30 families per quarter.  During the period April to
September 2025, 66 children were referred into the COPE service. The nature of
support provided for families was varied, but mostly centred around parenting support,
developing routines and boundaries, improving home conditions, and helping with
transitions and transport for parents.
14. The Promise has highlighted the importance of maintaining sibling relationships when
children and young people are accommodated. In 2025, WFWF funding was provided
to support the development of an outdoor play space (located at Westbank Outdoor
Early Learning and Childcare centre, Perth) which will provide a private space for
siblings and their families to come together to play in a private, welcoming location.
The project has now completed the planning process, and construction is underway. It
is anticipated that the space will be available for use by summer 2026.
15. Funding has been provided to support the locality-based model of support that is being
developed by the Fairer Futures project. WFWF funding has been provided to support
the co-location of services and delivery of holistic provision of services across the
areas supported. A shared funding approach (within input from WFWF, Fairer Futures,
Employability and Poverty funding) has allowed for space to be retained within both the
Hub in Letham and the Strathmore Hub in Coupar Angus for the coming year, which will
allow services to come together in a coordinated way to provide joined-up support for
families.
Page 159 of 186

Page 160

Appendix 1
PKC - GENERAL
Project Name
16. Working Smarter
Project Description
The Working Smarter programme has a number of different projects all related to the strategic
and integrated approach of people, technology and crucially, property – looking to improve
how we integrate all three for the best outcomes in relation to facilitating better productivity,
embracing technology, more effectively using our estate and buildings and enhancing
employees experience through flexible operating models.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) John Beveridge
Project Manager Kirsty Fleming / Mairi Milne
Current Project Timeline
 Project start date 01/04/2021
 Planned project completion date 21/12/2027
Current status of the Project
The Working Smarter project has reached a major milestone. Following Council approval on 4
September 2024 to purchase Pullar House and the Kinnoull Street Multi-storey Car Park, the
programme has transitioned into a consolidation and implementation phase.
Asset Purchases
Pullar House purchased for £4.51M
Kinnoull Street MSCP purchased for £1.443M
Partner Collocation
Partner engagement has been highly successful, with five of six partners now committed to
collocating within Pullar House:
 NHS Vaccination Services – in final stages of Property Sharing Agreement
 Scottish Government – Animal and Plant Health Agency (APHA) & Rural Payments and
Inspections Division (RPID)
 Crown Office and Procurator Fiscal Service (COPFS)
 NatureScot
 Social Security Scotland
 VisitScotland – current tenant, continuing long-term occupation
 We are currently awaiting the outcome of the Scottish Forestry business case, which,
if approved, would see them occupy space within the Scottish Government floorplate.
Page 160 of 186

Page 161

Appendix 1
PKC - GENERAL
Pullar House Technical Design & Construction
The Working Smarter Board has approved progressing construction on the west side of Pullar
House to accommodate COPFS, NatureScot, Customer Services, NHS, Archives, and
Museum storage. Construction sequencing will be finalised once the overall programme is
confirmed.
Project / Area Status
General required upgrades to Pullar House
(replacement / upgrade of critical systems
and works to facilitate collocation)
Technical design ongoing
Creation of bespoke COPFS space on the
GF and 2nd floor Pullar House
Design complete; final details in progress
Upgrade to Customer Service Centre GF
Pullar House
Technical design ongoing
Relocation of NHS locker rooms and create
of office space on the GF Pullar House
Technical design ongoing
Creation of bespoke SG space on the GF of
Pullar House
Design team meetings requested; next
steps awaited
Extension of existing archive space on the
2nd floor of Pullar House for use by PKC as
archive storage and CPK as collection
storage
Technical design ongoing
Justice Services from St Martin’s House to
the 2nd floor of Pullar House
Technical design ongoing
Kinnoull Street Multi Storey Car Park Technical Design & Construction
Parking Services, supported by Property Services, have appointed an external Project
Manager to oversee essential upgrades. EV charger installation has been costed, and a
construction programme is expected shortly.
Agreed Project Outcome(s)
The Project is anticipated to deliver the following:
1. Improved collaboration, at all levels, and between Council staff and our other
stakeholders.
2. Utilising technology and new working styles to facilitate better productivity.
3. Enhanced employee experience and work/life balance through our more flexible
operating model – we anticipate an additional benefit from this in the areas of staff
recruitment and retention.
4. More effective use of our property estate, allowing more collaborative working and
reducing our carbon footprint.
5. An established model which will provide for the more effective, efficient, and
sustainable delivery of services to our communities.
Outputs delivered since update
Page 161 of 186

Page 162

Appendix 1
PKC - GENERAL
1. Completion of the purchase of Pullar House and Kinnoull Street MSCP
2. Completion of Pullar House DDA improvements, including a new disabled toilet and
accessibility upgrades on the 1st floor
3. Move in and confirmed long-term commitment from NHS Vaccination Services
4. Space Planning Phase 2 completed, maximising utilisation of office space for both
Council and partner organisations
5. Staff reconfiguration and relocations across Pullar House and 2–26 High Street have
concluded, with all scheduled moves delivered
6. Completion of construction at Inveralmond Depot, enabling the collocation of the Traffic
& Network Team in October 2025
7. Completion of construction at 2–26 High Street, delivering four additional meeting
rooms
8. Securing commitment from six of seven partners to collocate within Pullar House,
exceeding initial income projections and fully utilising available space
Page 162 of 186

Page 163

Appendix 1
PKC - GENERAL
Project Name
17. Zero Waste & Operations
Project Description
This programme involves a review of waste strategy and waste management arrangements to
deliver national initiatives, improved outcomes and realise best value and service
efficiencies. It has a number of workstreams including commercialisation review; operational
asset review; circular economy strategy and service design beyond twin stream; schools
recycling improvement, fleet transformation. Alongside this, the programme also includes a
review of the delivery of our operations to ensure we are maximising opportunities for
efficiency and effectiveness.
Project governance structure
Executive Sponsor Clare Mailer
Senior Responsible Owner (SRO) Fraser Crofts
Project Manager Pete Leonard
Current Project Timeline
 Project start date 01/12/2024
 Planned project completion date 31/12/2027
Current status of the Project
This project is progressing well, the majority of the workstreams within this programme are
now completed and progressing as business as usual – the remaining workstream in the
project is Operations Resourcing Review.
Agreed Project Outcome(s)
Page 163 of 186

Page 164

Appendix 1
PKC - GENERAL
The Project is anticipated to deliver the following:
1. Clarity on resource requirements and operating model for all activities currently being
undertaken by the Operations Team
2. Commercialisation review will present service delivery options and identify the
optimum target operating model.
3. Operational property/depot asset review will establish investment requirements to
support a sustainable (money and carbon) operational asset base over the next 30
years, aligned with the approach set out in the Council’s approved Property Asset
Management Strategy
4. Circular economy strategy will inform the future transformation of the Council’s waste
and recycling operations and associated infrastructure and/or major contracts
expenditure together with sustainable economic development activity with local
businesses
5. Fleet transformation will build on the existing Fleet Asset Strategy to identify
investment requirements to support the decarbonisation of the Council fleet. It will
also seek to maximise the efficient use of the fleet/grey fleet. There is a dependency on
other work to extend and improve EV charging infrastructure
6. Schools recycling improvement project will reduce carbon emissions and save money
and present STEM and citizenship opportunities for learners.
7. Further development of the technology system will improve business insights and
customer service
Outputs delivered since last update
1. Operations resourcing review
The Association for Public Service Excellence (APSE) have been commissioned to
undertake a discovery exercise with relation to PKC’s existing operations being
benchmarked against other local authorities. This work is ongoing; however, early
indications are that PKC performance is strong across many of the indicators.
With regards to existing operations, agency spend is projected to be reduced by
approximately £400,000 year-on-year and overtime reduced by approximately £200,000.
Once the final report has been reviewed, and if required, an Action Plan will be
developed to ensure we have the optimal operating model for all activities being
delivered by the Operations Team.
2. Commercialisation review
This workstream focused on focussing the skip hire business. Work has progressed well
and this workstream is now considered to be business as usual.
3. Operational Asset Review
Operational Asset Review report including potential options has been completed. The
output of this report is currently being considered as part of the development of the
Council’s Strategic Investment planning process and is now being considered as
business as usual.
4. Circular Economy Strategy
Page 164 of 186

Page 165

Appendix 1
PKC - GENERAL
Climate Change and Sustainability Committee approved the strategy and associated
action plan at its meeting of 18 February 2026. The implementation of the Action Plan is
now considered to be business as usual.
5. Fleet Decarbonisation
The activities associated with this work are being delivered through the Council’s
Strategic Investment Planning and in particular through its Fleet Asset Management
Plan. This is now considered to be business as usual.
6. Schools Recycling Improvement
The initial pilot work for this workstream was successfully delivered and we continue to
deliver on the wider rollout across the primary and secondary school estate. This work is
now considered as business as usual.
7. Business Insights and Customer Service Improvements
The activities within this workstream are to be incorporated within the wider corporate
AI/Automation project.
For the purposes of the Zero Waste and Operations project this workstream is
considered as being completed.
Page 165 of 186

Page 166

Page 166 of 186

Page 167

Appendix 2
PKC - GENERAL
Transformation and Change
– reshaping our organisation
Sample of Project Overviews
– April 2026
9
Page 167 of 186

Page 168

Appendix 2
PKC - GENERAL
Contents Page
Projects
1. Additional Support Needs (ASN)
2. AI and Automation
3. Business Systems Management Efficiency &
Rationalisation Project (BSMER)
4. Customer Services Transformation
5. Fairer Communities for All Model
6. Improving Health & Wellbeing and Attendance in the
Education Workforce
7. Whole Family Wellbeing (WFWB) programme
8. Zero Waste & Operations
Page 168 of 186

Page 169

Appendix 2
PKC - GENERAL
Page 169 of 186

Page 170

Appendix 2
PKC - GENERAL
Page 170 of 186

Page 171

Appendix 2
PKC - GENERAL
Business Systems Rationalisation
Business Systems Management • Efficiency •
Rationalisation
The Team
Project Manager Dave Turner      Business Analyst Damilola Ojie
Dev Business Analyst/Project Support Ashleigh Mazur     
Procurement Support – Elaine Brett  
Background
Council operates a decentralisedmodel
for business systems, causing
fragmented data and inefficiencies. T&C
programme commissioned a review to
create a one council view of the
application landscape.
Project Timeline
Phase 1: Discovery (May–Dec 2023)
Phase 2: Initiation (Jan–May 2024) –
Single view of systems, new operating
model, business case.
Phase 3: Implementation (June 2024
onwards) –Operating model embedded,
prioritisedchanges delivered
Project extended to 31 Mar 2026
(December 2024)Description
Programme aims to implement a One
Council approach for governance,
security, and efficiency and embed a
cost-benefit model, rationalise systems.
Outcomes
One Council culture, single view of
Council business systems, improved
customer outcomes, fit-for-future
operating model, reduced technical
debt, improved security posture and
compliance.
Critical Success Factors
Strong sponsorship, holistic governance,
funding for early phases, strengthened
Digital Board leadership.
Contact for more information: Dave Turner (IT
Team Leader) | dturner@pkc.gov.ukor
CDSBSRProjectTeam@pkc.gov.uk
A Perth and Kinross where everyone can live life well, free from poverty and inequality
Key Challenges
• Lack of transparency on costs
• Siloeddecision-making
• Resourceconstraints
• Resistanceto changelack of
prioritisation.
• Application data proved to be
incomplete or none existent
Key Learning Points
The presumption that comprehensive
application information would exist was
optimistic
Lack of understanding about what the
project could achieve and the value of
what has been achieved
Benefits Realisation
Improved value, compliance
improvements, development
streamlined processes, improved
resilience.Next Steps
• Embed operating model.
• Implement decommission
programme.
• Expand governance and supplier
engagement best practices.
Page 171 of 186

Page 172

Appendix 2
PKC - GENERAL
Page 172 of 186

Page 173

Appendix 2
PKC - GENERAL
Fairer Futures: Tackling Child Poverty, including
the root causes and impacts for children, with
their families and the communities in which they
live.
Paul Smith and Jade Doig
Background
Project Timeline
• Nationally, Fairer Futures Partnerships are part of the
Scottish Government mission to eradicate child
poverty. The focus is on innovative practice, through
a placed-based, data driven and collaborative
approach.
• In Perth and Kinross, we recognise that no child is
responsible for the circumstances in which they are
born and raised. The economic and social landscape
is trapping families in poverty.
• We are committed to finding solutions to reduce child
poverty. No child deserves to have their future, health
or wellbeing determined by poverty.
January: Strategy and plan sign off. Data profiles &
dashboards assessable for 6 areas.
January - March: engagement including focus groups,
individual interviews, targeted placed-based activity
including funding decisions.
March–May: data analysis and dissemination. Design
workshop with services for child poverty action plan.
January–February: exploring and discovering
workshops. Base line data gathering for KPI’s.
March–September: designing solutions, thematic
workshops. Sharing good practise across places. Mid
point review.
October–December: implementation and creating
longevity workshops. Year review report.
Description
New Fairer Futures place-based, MDT partnerships are
being established to gain local knowledge, and plan
and undertake the actions needed to address the
drivers of poverty, including: insufficient income from
employment, insufficient income from social security
and cost of living. This means working with people
experiencing poverty to design effective action on
income maximisation, reducing the cost of living and
addressing the barriers to employment.
Outcomes
We will:
1. Reduce child poverty
2. Increase participation, trust and capacity building
with our communities.
3. Improve policy and practise, including shifting to a
more preventative approach
Critical Success Factors
1. Robust understanding of need through data
analysis on health, wellbeing and the economy.
2. Effective and sustaining teams gaining
understanding of need, designing and
implementing solutions.
3. Effective strategic collaboration to drive innovation
and ambitious action.
4. Sufficient resource and buy-in across services,
teams and organisations.
5. Problem solving and designing solutions with
people who are living in poverty.
6. Strong value based and good understanding of
systemic factors which drive poverty
Contact for more information
jadedoig@pkc.gov.uk
A Perth and Kinross where everyone can live life well, free from poverty and inequality
Key Challenges
Recruitment delays in establishing staff team to drive
project forward
Communication and broader understanding of project
Broad remit which is reliant on a range of participant
contributions
Complex and stubborn problem, impacted by global,
national and local factors.
Stigma and discrimination towards people living in
poverty
People with lived experience not being heard
Key Learning Points
Project creep, defining purpose and ambition of project
while understanding intersecting and interdependent
areas of work. SDP in development.
Buy-in and wider understanding of project required
improvement. New messaging and comms plan in
development. Changed from locality working to placed
based.
Planning for Highland as an intermediate zone was not
successful due to composition of area, so planning over
several smaller places.
Benefits Realisation / Achievements
Fairer Future’s staff Team established, along with key
collaborators identified
MDT workshop participants identified, and activities
scheduled across 2025-26
Data profiles designed, and work underway with IT to
create dashboards
Established governance structure including steering
group functioning with newly defined purpose
Engagement activates planned and scheduled for Jan-
March 2026
Next Steps
Establish additional MDT’s, co-ordinate increased
activity of all MDT’s
Understand lived experience and needs, and support
participation in design process
Undertake thematic workshops to design solutions
Establish KPI’s to measure impact
Reference Materials
Fairer Futures Partnerships Evaluation Strategy
Page 173 of 186

Page 174

Appendix 2
PKC - GENERAL
Improving Health and Wellbeing and Attendance -
Education Workforce 
Morag Charity, Project Officer ; Susie Turner, Principal Educational Psychologist
Background Project Timeline
Description
Our Education workforce is a keyasset in meeting
our statutory obligations.
Education is integral to delivering our corporate
priorities relating to children and young people.
This project is about the importance of getting it
right for the education workforce –supporting
them in their role in getting it right for our children
and young people.
Outcomes
Critical Success Factors
So how will we know?
• Reduction in overall reported absence levels
within the education workforce.
• Reduction in reported work-related illness
absences in education settings.
• Reduction in supply costs linked to ill health
absences.
• Improvement in key wellbeing measures in
future employee surveys.
• Improved retention & recruitment.
• Improved effectiveness of the PKC Health and
Wellbeing Framework  in education settings.
Contact for more information
STurner@pkc.gov.uk
MACharity@pkc.gov.uk A Perth and Kinross where everyone can live life well, free from poverty and inequality
Key Challenges
Key Learning Points
unexpected insights!
• Significance of infection and gastric illness.
• Importance of streamlining communications –
making this coherent and predictable.
• New opportunities to build coalition around
meaningful and achievable change.
Benefits Realisation / Achievements
• Cross-service collaboration leading to shared
benefits
• Engagement with Professional Organisations
Next Steps
Collaboration & Co-Creation
• Action Research
• Working Groups
• Education Staff Voice
September
2025
November
2026
Data
Competing
demands
Response to data analysis:
• Education staff feedback in
the Employee Survey
• Attendance rates
• Retention & Recruitment
challenges
By:
• Refining and supporting the Corporate
Offer to meet the needs of the
Education Workforce.
Adding:
• Evidence based supports for targeted
groups of staff.
• A Programme of Career Long
Professional Learning that supports
health and wellbeing for education.
• Enhanced communication approaches
for our education context.
The Project aims to strengthen our commitment to
enabling our children & young people to meet their full
potential through developing  a Health and Wellbeing
Strategy for the Education Workforce.
Page 174 of 186

Page 175

Appendix 2
PKC - GENERAL
Whole Family Wellbeing Programme
Dr Carol McAuley – WFWF Programme Manager
Background Project Timeline
The Whole Family Wellbeing Fund is a Scottish Government (SG)
initiative aimed at increasing the delivering holistic family support
when, where and for as long as it is needed, with a focus on early
intervention and prevention.
The WFWF Programme also aligns with other key Scottish
Government policies affecting the wellbeing of children, young
people and families, including The Promise, UNCRC, GIRFEC, Child
Poverty Delivery Plan (Best Start Bright Futures), Mental Health
Strategy, Raising Attainment Strategy etc.
Funding for the WFWF programme is available for the period April
2022 to March 2027.
Description
The projects supports improvement work across 4 core components
and includes:
• Engaging with families and professionals to establish local need.
• Improving awareness of and access to low-threshold support.
• Creating infrastructure to identify gaps in holistic family support
provision, develop and deliver new services.
• Building links with key stakeholders to support capacity building
and partnership working.
Outcomes
A series of short-, medium- and long-term outcomes have been
developed by Scottish Government for each of the 4 core
components above. 
Local outcomes include:
• Increased provision of universally accessible early support
• Better collective awareness of available support and how to
access it, for both families and professionals.
• Support experienced as "joined up“ by families
• Families are provided with choice about support and are
involved in decisions that affect them.
• Increased engagement with children, young people and families
• Key principles of holistic family support and early intervention
and prevention are embedded within structures and systems.
• Increased collaboration between services and organisations that
support families (including adult services and third sector).
• Clear and shared understanding of the needs of families across
the whole system.
• Staff are encouraged and empowered to develop innovative
family support solutions along with families
• Improved capacity within the workforce to respond to the needs
of families in a holistic way, both signposting and support.
Critical Success Factors
• Increase capacity of existing services to deliver holistic family
support (additional 300 families across P&K). New FACCS
service to provide direct support for around 250 families.
• Increased number of families and practitioners have access to
information about services.  Directory – quarterly usage >200
hits.
• Online FORT referral system increasingly used by services.  Aim
to have over 30 organisations using FORT by Jan 25.
• Increased engagement with children, young people and families.
Gather feedback from service users and more widely
• Development of networks to support better partnership working
between professionals.
• Development of a performance framework to evaluate whole
family support.
• Decrease in number of families requiring crisis support
Contact for more information
cmcauley@pkc.gov.uk
A Perth and Kinross where everyone can live life well, free from poverty and inequality
Key Challenges
Breaking down silos:  Despite some improvements in partnership
working, maintaining communication and collaborative working
across a broad range of services is challenging, especially across
children’s and adult services.
Sustained engagement with families: we have struggled to
establish consistent models of engagement with children, young
people and families.  Many of the families we would wish to hear
from are least likely to contribute.
Long-term sustainability: WFWF uses fixed-term funding from SG
which is due to finish in 2026/27. The intention from SG is that
reduction in crisis demands should enable reinvestment of savings in
early intervention services.  However, the current funding climate,
increased demands for mental health services, complex ASN, and
the cost-of-living crisis means that, so far, there has been little
opportunity for funds to be diverted.
Key Learning Points
• Importance of key vision across stakeholders, and buy-in from
leadership
• Effective communication and shared language – regularly
updated
• Time needed to develop partnerships and relationships
• Impact on families is often longer-term and can be difficult to
attribute to specific WFWF activity, making evaluation difficult.
Benefits Realisation / Achievements
• Development of Whole Family Support Directory
• Development of the FORT online referral system, and Support
and Connect Training.  Over 70 organisations making and/or
receiving referrals.
• Scaling up of existing services (Parenting and Family Learning,
Families Empowering Communities, COPE), and commissioning
of a new universal family support service (FACCS).
• In 2024/25, 380 families provided with direct support at a range
of levels, with a further 1000 families receiving indirect support.
• Establishment of Family Support Practitioner Network, over 130
individuals from over 50 service areas and  organisations
• Alignment with Fairer Futures project to support locality-working
model.
Next Steps
• Evaluation of activity in 2025/26 with report to SG
• Preventative spend/social value research
• Development of ongoing engagement framework
• Development of workforce development and training tools
• Integration of WFWF work into new Integrated Children’s
Services Plan
Reference Materials
Whole Family Wellbeing Funding - Getting it right for every
child (GIRFEC) - gov.scot
Whole family support - Directory of services - Perth & Kinross
Council
Support and Connect (FORT)
Page 175 of 186

Page 176

Appendix 2
PKC - GENERAL
Zero Waste and Operations Transformation
Programme
Project Manager: Pete Leonard
Background Project Timeline
The waste and recycling industry is facing a period of
significant policy, legislative and technical change over
the next five years. The transformation programme
provides an overview of policy development activities
together with the impact that these may have on the
services that we provide to PKC citizens. It will inform
how our operational teams respond to the challenges
and opportunities that may arise.
The project started in 2025 and is scheduled to run until
the end of Q4 2025-26. At this point it is envisaged that
the programme will transition into a number of business
improvement projects, although some activities will
remain engaged with wider transformation work, for
example business insights and customer service.
Description
The programme consists of 7 separate, but related
projects:
1. Circular economy strategy and service design
2. Commercialisation review
3. Operations resourcing review
4. Operational asset review
5. Fleet transformation
6. Schools recycling project
7. Business insights and customer service
Outcomes
• Inform future service design to comply with new
policy and legislation
• Provide clarity on future resource requirements and
workforce development
• Identify future need for operational depots and
ensure that investment requirements are included in
the corporate capital asset planning
• Ensure that our vehicle fleet is efficient and meets
climate change aspirations and legislative
requirements
• Improve recycling in our schools, saving money and
reducing carbon emissions, whilst engaging pupils in
learning for sustainability and STEM related
curricular activities
• Improve operational efficiency, business insights
and customer service outcomes by development of
IT, automation and AI technologies
Critical Success Factors
• Understanding and agreement on resource model
and associated budget
• Reduction in CO2 emissions
• Increased income from recycling
• Increased commercial income
• Circular economy agreed by Council committee with
good engagement from stakeholders
• Investment plan for operational buildings
pleonard@pkc.gov.uk
Contact for more information
A Perth and Kinross where everyone can live life well, free from poverty and inequality
Key Challenges
• Significant level of change across a range of issues
and teams – capacity and complexity – even with
buy in
• Change happening over a period of 5 years – hard
to prepare when policies and legislation are not yet
determined at a national level
Key Learning Points
• Some items are really business improvement rather
than truly transformational – however taken together
they will have a transformational impact on our
services
• Be ambitious but realistic – prioritise work to reflect
available resource and take account of ‘business as
usual’ activities getting in the way
• We don’t have the knowledge and skills that we
need in some areas – particularly in the digital world
– so linking with other transformation projects is
helpful, as is bringing in external expertise
Benefits Realisation / Achievements
• CE strategy going to CC&S Committee 18 Feb
• New skip hire services launched and doing well
• Benchmarking of services almost complete.
• Reductions in agency and overtime costs
• Recommendations from  operational asset review
going to Corporate Asset Group in February/March
• Heavy fleet transitioned to using hydro-treated
vegetable oil fuel reducing CO2 emissions and
improving air quality
• Recycling improvements made to some schools
Next Steps
What’s next – transition from transformation
programme to business improvement implementation
Reference Materials
Add Web links . . .
Page 176 of 186

Page 177

Perth & Kinross Council   |   Strategic AI & Automation Programme   |   April 2026                        Appendix 3
AI tools have been used in the preparation of this document and any accompanying materials. All content has
been reviewed by Chris Wright for accuracy prior to publication.
Responsible AI at Scale
How Perth & Kinross Council is embedding artificial intelligence across public services
Over the past 12 months, Perth & Kinross Council has built one of the most comprehensive AI programmes in
Scottish local government. The Strategic AI & Automation Programme covers governance, staff capability,
productivity tools, and AI-assisted transcription — deployed responsibly, with full oversight and with staff at the
centre of every decision.
500+
Copilot licences
2+ hrs
saved per user per week
65%
of staff enrolled in AI literacy
All
Strategic Leads engaged
What we have built
Microsoft 365 Copilot
Copilot licences are now live across the Council. Staff are
saving more than 2 hours every week — time redirected
from administration to frontline service delivery. The
continuation rate stands at 95%, driven by staff choosing to
keep using the tool, not by mandate.
AI Transcription — PKC Notes
Meetings, interviews, and consultations are now
automatically transcribed and summarised, allowing
officers to focus on the person in front of them rather than
taking notes. PKC Notes is an in-house developed solution
using our Microsoft infrastructure soon to be live in
Welfare Rights.
AI Literacy Programme
65% of PKC staff have enrolled in AI literacy training.
Enrolment was voluntary. Staff chose to participate
because the programme was designed to be useful, not
imposed.
How we govern it
Every AI tool deployed by PKC operates within a
governance framework approved by the Council. The AI
Register records every active use case. Data Protection
Impact Assessments are completed before deployment. AI
use is monitored continuously.
PKC was one of the first Scottish councils to publish an AI
Policy, making its governance approach transparent to
staff, elected members, and the public.
A national role
PKC co-leads the Scottish AI Community — a peer
network spanning all 32 Scottish councils. PKC's
programme is shaping how AI is adopted responsibly
across Scottish local government, positioning the
Council as a national sector leader.
What comes next
– Expand AI transcription into further services across
the Council
– Continue growing Copilot adoption as demand from
services increases
– Align with PKC's Transformation Programme Phase 3,
in which Digital and Automation is named as a
national delivery priority from June 2026
– Formalise benefits realisation tracking across all
strategic areas
9
Page 177 of 186

Page 178

Perth & Kinross Council   |   Strategic AI & Automation Programme   |   April 2026                        Appendix 3
AI tools have been used in the preparation of this document and any accompanying materials. All content has
been reviewed by Chris Wright for accuracy prior to publication.
Page 178 of 186

Page 179

Perth & Kinross
Integration Joint Board
Audit and Performance Committee
Date of Meeting: 23 February 2026
Title of Report: Transformation Programme Update
Report Number: G/26/11
Report by: Jacquie Pepper, Chief Officer
Report Author: Christopher Jolly – Service Manager Business Planning and
Performance
Contact: tay.pkijbbusinesssupport@nhs.scot
________________________________________________________________________
1.0 Executive Summary
The HSCP Transformation Programme has delivered significant improvements
through the initial phase of transformation projects referred to as “the Big Six” and is
now progressing with phase 2. This includes the creation of new projects, the re-
scoping of others, and the continuation of others to meet the challenges faced. These
are being developed through a ‘Portfolio Management Office’ approach which aligns
systematically to the approach taken in Perth and Kinross Council. This will ensure
continued strong governance, greater alignment between partners and improved
readiness for collaboration.
2.0 Recommendations
The Audit and Performance Committee (A&PC) is asked to:
 Note the achievements delivered through the initial ‘Big Six’ transformation
projects.
 Note adoption of a Portfolio Management Office approach which aligns to that take
by Perth & Kinross Council.
 Request an update on progress made within Phase 2 of the Transformation
Portfolio on a six monthly basis.
3.0 Alignment To Strategic Plan Priorities and Ambitions
The update and proposal(s) within this report demonstrate progress in delivering on
the Perth and Kinross IJB Strategic Plan 2024-27 Priorities and Ambitions as below:
Appendix 4 9
Page 179 of 186

Page 180

Our Priorities
1 Target resources to where people and communities need help most. ☒
2 Make it easier for people to understand where and how to access services. ☐
3 Provide health and social care supports close to home. ☒
4 Work with communities to design the health and social care supports they need. ☒
5 Improved Integrated Working. ☒
6 Promote Self-management and Living Well. ☐
7 Value our workforce, support them to keep well, learn and develop. ☐
4.0 Alignment To Service Renewal Framework
Transformation Portfolio development is geared towards tackling current and
future service demand and aligns to the principles set out in the Scottish
Government’s Health and Social Care Renewal Framework 2025-2035 as follows:
Key Principles for Renewal
1 Prevention: Prevention across the continuum of care ☐
2 People: Care designed around people rather than the ‘system’ or
‘services’
☒
3 Community: More care in the community rather than a hospital-focussed
model
☒
4 Population: Population planning, rather than along boundaries ☐
5 Digital: Reflecting societal expectations and system needs ☐
5.0 Background - Evolution of the Transformation Programme
The HSCP Transformation Programme was established to redesign key areas of
health and social care services in Perth & Kinross, responding to rising demand,
financial pressures, and sustainability challenges. The programme began with six
priority projects—the ‘Big Six’—which focused on critical areas of service delivery.
These projects have now concluded or evolved, delivering significant improvements in
outcomes and efficiency.
In 2025, the programme transitioned to a structured Programme Management Office
(PMO) approach, aligned with PKC methodology. This strengthens governance,
introduces standardised tools and templates, and ensures agility while maintaining
robust oversight.
6.0 Proposal/Main Issues - Achievements to date
The initial phase of transformation focussed on areas of highest importance at the
time and delivered measurable improvements across key service areas. The following
provides a high level overview in respect to each project within Phase 1:
6.1 The Optimising Independence and Quality of Life for Older People at Home
Project focused on care at home provision, remodelling and optimising internal
Page 180 of 186

Page 181

service delivery, internal processes to improve access, workforce optimisation, and
the re-procurement of externally delivered services. This introduced alliance
contracting allowing providers greater opportunity to support one another and respond
to peoples’ evolving care needs.
The project reduced unmet need from around 1,200 hours per week to 350 hours per
week. Access to reablement support has also improved with people in hospital waiting
under 5 days for reablement support compared to around 9 days in 2024. For people
in the community, the wait on average now is 10 days compared to 20 in 2024. The
changes made also significantly enhanced assessments with an improvement seen in
both the quality of the assessments undertaken and the time taken to process them.
6.2 The Quality Safety and Efficiency in Prescribing Programme (QSEP) supports
primary care prescribing by identifying areas of prescribing variance, for example
where Perth and Kinross is an outlier compared to other areas or where medicines
are being prescribed when cheaper alternatives exist.
In 2024, the QSEP programme focused on supporting GP practices to review and
switch patients from their current prescriptions where appropriate.
 The Direct Oral Anticoagulant (DOAC) switch project resulted in 2,161
patients having their medication reviewed resulting in a £590k saving in
2024/25.
 The Gliptin switch project has been undertaken in 2025 with 20 of the 23
GP practices engaging with the project with an expected/projected saving of
£73k.
6.3 The Transformation of Complex Care Project reviewed the provision of services for
people with complex needs and made substantial improvements as follows:
 Workstream 1 – Integrated Multi-disciplinary Hub:
The SCOPE team was established as an integrated service for Learning Disability
and Autism, now operational and delivering cost avoidance through monitoring
care package costs.
 Workstream 2 – Technology Enabled Care (TEC):
The Overnight Responder Service was successfully piloted, has become
established, and is generating recurring savings of £45,000 per year.
 Workstream 3 – Day Opportunities & Respite:
A Day Opportunities Steering Group was created with four workstreams to
redesign in-house provision and expand inclusive community opportunities.
 Workstream 4 – Transitions:
A new transitions framework and Compass App were launched to improve
pathways for young people moving into adulthood.
 Workstream 5 – Behavioral Support Interventions:
Three workshops were undertaken over 2022 and 2023 which provided an
opportunity for stakeholders to explore Positive Behavioral Support (PBS) in Perth
and Kinross. There is a Short Life Working Group currently looking into
developing a P&K PBS pledge which supports this ambition. Psychology
colleagues in SCOPE are supporting PBS locally and working directly with
providers, as well as offering training when required.
 Workstream 6 – Independent Living:
Five Core and Cluster housing projects are in development, enabling people to
Page 181 of 186

Page 182

move from long-stay hospital into community tenancies and reducing costs
through economies of scale.
 Further cost efficiencies have been realised (£205k 2024/25 and projected £210k
for 2025/26) through the ongoing SCOPE intervention, the roll out of Technology
Enabled Care and Core and Cluster models.
6.4 Primary Care Mental Health / Community Project responded to the need for
greater access to mental health support within a primary care community setting. All
GP practices now have routine/direct access to a mental health professional. The role
is able to provide swift early intervention with this support and patient assessment
playing a key part in the mental health system.
6.5 The Optimising Rehabilitation Services Project is assessing the needs of the
population in terms of rehabilitative services. It is considering the best way for those
services to be delivered and in doing so is reviewing access to current provision within
existing establishments. This is a longer-term project with significant complexity which
is progressing to options appraisal, consultation, and engagement phases. The
project is due for completion in late 2026 and as such forms part of phase 2 of the
Transformation Portfolio.
6.6 The Psychiatry of Old Age and enhancing capacity in the Community (POA)
Project was included in the portfolio with the intention of shifting existing, hospital-
based supports to a more community-based model of delivery, whilst enhancing
services for EMI patients. Investment into Inpatient Services was made by the IJB
through budget-setting processes to try to address some of these objectives, however
recruitment to the proposed model proved challenging, requiring a re-scope of the
project. As a result, the project is now being re-scoped to take a longer term, strategic
view of the changing needs of the population and the forecasted increase in the need
for more community-based service provision. This project will be carried forward into
Phase 2.
6.7 Transformation Portfolio – Phase 2
Phase 2 of the portfolio consists of the following projects. Each of these is at a
different stage of development and delivery and the following provides a brief
overview of the project purpose and the status of each. Further, more detailed,
updates on the portfolio will be provided as the portfolio develops.
 Developing a Person-Centred Approach to Rehabilitation and Reablement:
This project carries over from Phase 1 of the portfolio. Please see above for more
information in terms of progress.
 Dementia & Enhancing Capacity in the Community (Psychiatry of Old Age):
This project is in the early stages of development with the project proposal
scheduled for presentation to the Transformation Board in early 2026.
 Learning Disability Services review:
Similar to above this project is in the early stages of development with a project
proposal scheduled for consideration via the Transformation Board in early 2026.
 Review of Older People Day Care Services:
This project seeks to identify a future a model for Day Services which makes best
use of resources and addresses the rural geography of Perth and Kinross. The
Page 182 of 186

Page 183

aim is to deliver person-centred, sustainable day services which help older people
maintain independence and community connections. The project is currently
formulating the options appraisal which will be considered by the Transformation
Board in early 2026.
6.8 Portfolio Management Office Approach
A new governance methodology has been established within the Health and Social
Care Partnership to enhance oversight of project initiation and ongoing monitoring
through a Portfolio Management Office (PMO) approach. This methodology is
informed by the Health and Social Care Service Renewal Framework (SRF)
2025–2035, ensuring alignment with long-term strategic priorities. The approach
closely reflects the model adopted within Perth & Kinross Council, while being
tailored to support transformation within the Partnership. Although documentation
requirements differ to meet the specific needs of each organisation, the
methodologies remain aligned in principle and practice and operate on a shared
technology platform. This alignment is creating opportunities for cross-
organisational learning and increasing the potential for coordinated delivery of
desired outcomes.
7.0 Impacts
 Best Value: There are no direct best value impacts associate with this report
however the transformation portfolio is focussed on areas which it is felt can be
optimised further. As such the best value characteristics form an integral element
of the portfolio.
 This report provides evidence of the following Best Value Characteristics:
Best Value
Vision and Leadership ☒
Governance and Accountability ☒
Effective use of Resources ☒
Partnerships and Collaborative Working ☒
Working with Communities ☒
Sustainability ☒
Fairness and Equality ☒
 National Health and Wellbeing Outcomes
It is expected that the proposal(s) will impact on the achievement of the National
Health and Wellbeing Outcomes as below:
Page 183 of 186

Page 184

No National Health and Wellbeing Outcome
Increase/
Decrease/
No Impact
NHW01 People are able to look after and improve their own health and
wellbeing and live in good health. Increase
NHW02 People, including those with disabilities or long-term
conditions or who are frail, are able to live, as far as
reasonably practicable, independently and at home or in a
homely setting.
Increase
NHW03 People who use Health and Social Care services have
positive experiences of those service and have their dignity
respected.
Increase
NHW04 Health and Social Care services are centred on helping to
maintain or improve the quality of life of people who use the
services.
Increase
NHW05 Health and Social Care services contribute to reducing health
inequalities. Increase
NHW06 People who provide unpaid care are supported to look after
their own health and wellbeing, including to reduce any
negative impact on their caring role on their own health and
wellbeing.
Increase
NHW07 People using Health and Social services are safe from harm. Increase
NHW08 People who work in Health and Social Care services feel
engaged with the work they do and are supported to
continuously improve the information, support, care and
treatment they provide.
Increase
NHW09 Resources are used effectively and efficiently in the provision
of Health and Social Care services. Increase
 Financial Implications
There are no financial implications arising from this report directly. The
Transformation Portfolio however underpins the delivery of the IJB’s financial
recovery plan. Scrutiny of this forms part of the PMO approach with projects
tracked via the Transformation Board.
 Equality, Human Rights and Fairer Scotland Duty Implications
Each project which is taken forward is required to consider equality, human rights
and Fairer Scotland duties throughout the project development, delivery and
implementation. Scrutiny of this forms part of the PMO approach.
 Climate Change, Sustainability and Environmental Implications
There are no climate change, sustainability or environmental implications in
relation to this report. Each project however, in so far as they relate to service
Page 184 of 186

Page 185

change, will make an assessment of any impact in this respect. Scrutiny of this
forms part of the PMO approach.
 Legal and Governance
There are no legal implications arising from this report however the adoption of a
PMO approach strengths the governance already in place.
 Other Implications
None
8.0 Management of Risk
There are no risks arising directly from this report. Risk management however is core
element of project, programme and portfolio management. The PMO approach which
is now in place supports this with risks raise, managed and reported at each layer of
governance appropriately. As Phase 2 projects are developed a new portfolio risk
register will be created to manage risks across the portfolio.
9.0 Governance Consultation Route
 The matters contained within this paper have been considered and/or consulted
on by the following group(s) as part of its development:
P&K HSCP Senior Management Team ☒
P&K Strategic Planning Group ☐
P&K IJB Audit and Performance Committee ☐
P&K HSCP Integrated Management Team ☐
Update requested by P&K IJB ☐
Other (state below) ☐
................................................................................................
Not Applicable ☐
 Following consideration/decision by the Perth & Kinross IJB Audit and
Performance Committee, this report will be shared with:
Perth and Kinross Integration Joint Board ☐
NHS Tayside Board ☐
NHS Tayside committee(s) – specify
................................................................................................
☐
Perth & Kinross Council ☐
Perth & Kinross Council Committee(s) – specify
................................................................................................
☐
Other (state below) ☒
Perth and Kinross Council Transformation Board...................
Not Applicable ☐
Page 185 of 186

Page 186

Appendices
None
NOTE:
No background papers, as defined by Section 50D of the Local Government (Scotland) Act
1973 (other than any containing confidential or exempt information), were relied on to any
material extent in preparing this report.
Page 186 of 186