Democracy Spraffa

Agenda Document Pack - Economy and Infrastructure Committee - 26/08/2026

Perth and Kinross Council · 26 August 2026
Back to Economy and Infrastructure Committee — 26 August 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
19/08/2026 
A hybrid meeting of the Economy and Infrastructure Committee will be held in the
Council Chamber on Wednesday, 26 August 2026 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Grant Laing (Convener)
Councillor Ian Massie (Vice-Convener)
Councillor Jack Welch (Vice-Convener)
Councillor Hugh Anderson
Bailie Rhona Brock
Councillor Steven Carr
Councillor Stewart Donaldson
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Councillor Alan Watt
Page 1 of 254

Page 2

Page 2 of 254

Page 3

Economy and Infrastructure Committee 
Wednesday, 26 August 2026 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE ECONOMY AND
INFRASTRUCTURE COMMITTEE OF 22 APRIL 2026 FOR
APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 26/218) 
9 - 10 
5 COUNCIL SUPPORT TO BUSINESSES
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 26/219) 
11 - 18 
6 BUSINESS SUPPORT REVIEW
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 26/220) 
19 - 80 
7 PERTH AND KINROSS ECONOMIC ACTION PLAN (2025-2030)
ANNUAL PROGRESS REPORT
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 26/221) 
81 - 96 
8 PERTH AND KINROSS FORESTRY AND WOODLAND
STRATEGY (DRAFT)
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 26/222) 
97 - 174 
9 PERTH AND KINROSS OPEN SPACE STRATEGY DRAFT
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 22/223) 
175 - 254 
Page 3 of 254

Page 4

Page 4 of 254

Page 5

Economy and Infrastructure Committee 
Minute of hybrid meeting of the Economy and Infrastructure Committee held in the
Council Chambers on Wednesday 22 April 2026 at 9.30am. 
Present: Councillors G Laing, I Massie, J Welch, H Anderson, Bailie R Brock, S Carr,
S Donaldson, J Duff, A Forbes (up to and including Item 7), K Harvey, N Khogali,
C Stewart, W Robertson, F Smith and A Watt (up to and including Item 7). 
In Attendance: C Mailer, Depute Chief Executive; S Merone, Strategic Lead –
Economy, Development and Planning; F Crofts, Strategic Lead – Environment and
Infrastructure; K Smith E Archibald (up to and including Item 6), M Barr (up to and
including Item 6) and A Finlayson (up to and including Item 5) (all Economy,
Development and Planning); J Janes, J Ferguson, R Dobson, K Easton,
S MacDonald and W Mahoney (all Environment and Infrastructure); A Seggie and
M Willis (both Strategic Planning, People and Performance); G Fogg (up to and
including Item 5), A Taylor, S Hendry, A Brown and M Pasternak (all Legal and
Governance). 
Councillor G Laing, Convener, Presiding. 
The Convener led on Items 1-6 and 8, with Vice-Convener Welch on Item 7. 
1. Welcome and Apologies 
Convener welcomed everyone to the meeting.  There were no apologies for
absence. 
2. Declarations of Interest 
In terms of the Councillors’ Code of Conduct, Councillor A Watt declared a
non-financial interest in Item 8 – Road Maintenance Partnership Agreement
Extension. 
3. Minute of Meeting of Economy and Infrastructure Committee of
28 January 2026 
The minute of the meeting of the Economy and Infrastructure Committee of
28 January 2026 was submitted and approved as a correct record. 
4. Outstanding Business Statement 
Resolved:
The status of actions in the Outstanding Business Statement (26/105) be
noted and completed actions removed accordingly. 
3
Page 5 of 254

Page 6

5. Perth West Development Masterplan 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (26/105) seeking approval of a development masterplan for that part of
Perth West owned by The John Dewar Lamberkin Trust. 
(The Committee took a short recess and reconvened at 10.20am). 
Resolved:
The Perth West development masterplan be approved, subject to the
concerns raised by Members on behalf of residents that particular attention be paid
to traffic infrastructure and water managements issues being fed back to the
developer. 
6. Review of the Planning Enforcement Charter 
There was submitted a report by the Strategic Lead - Economy, Development
and Planning (26/106) seeking approval of an updated version of the Council’s
Planning Enforcement Charter following a review undertaken in accordance with the
Town and Country Planning (Scotland) Act 1997. 
Resolved:
The updated version of the Council’s Planning Enforcement Charter, as
detailed in Appendix 1 of Report 26/106, be approved. 
(The Committee took a short recess and reconvened at 11.13am). 
7. Commercial Property Investment Programme (CPIP) Progress Update 
There was submitted a report by the Strategic Lead - Economy, Development
and Planning (26/107) providing a progress update on the Commercial Property
Investment Programme following the decision to allocate an additional £7 million of
capital funding to the Programme for the period 2025/26 to 2027/28 to support the
delivery of new employment land and buildings in line with the priorities set out in the
Council’s Corporate Plan 2022-27. 
Resolved:
The positive progress, as outlined in Report 26/107, be noted. 
8. Road Maintenance Partnership Agreement Extension 
There was submitted a report by the Strategic Lead - Environment and
Infrastructure (26/108) (1) seeking approval to implement the two-year extension
option to the existing partnership agreement and (2) advising on further collaborative
arrangements during this extension period, aimed to optimise efficiency and
informing the development of a successor agreement beyond 2028. 
Resolved:
(i) The existing partnership agreement, as set out in Appendix 1 to Report
26/108, between Perth and Kinross Council and Tayside Contracts be
Page 6 of 254

Page 7

extended to 31 March 2028 to deliver road maintenance, winter maintenance
and all year emergency response services.
(ii) Authority be delegated to the Strategic Lead - Environment and Infrastructure
to trial alternate methods of measurement and reimbursement during the two-
year extension period to inform the development of future arrangements
beyond 2028.
(iii) It be agreed that the partnership continue to report performance annually as
part of the Council’s corporate performance management framework. 
9. Valedictory – Alison Seggie, Economic Development Manager 
The Convener and Councillor J Duff both passed on their best wishes and
appreciation on behalf of all elected members to Alison Seggie, Economic
Development Manager, who was retiring soon after a career spanning 38 years with
the Council.  They both thanked Alison for her dedication, professionalism and
contribution over the years and wished her a long, happy and well deserved
retirement and all the very best for the future.
Page 7 of 254

Page 8

Page 8 of 254

Page 9

ECONOMY & INFRASTRUCTURE COMMITTEE
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 26/218) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
27. 28 May 2025
Item 8
School Exclusion
Zone Update
Committee to consider,
in conjunction with
relevant officers, a
refresh or review of
Safer Routes to School
Plans to reflect new
residential
developments. 
Climate Change
funding has recently
been awarded to
support a wider piece
of work around school
road safety and
sustainable travel
which will include a
review of existing
school travel plans. 
There will be a
particular focus on
early years to promote
and encourage more
sustainable travel
methods with the
potential for spend to
save investment
through reduced home
to school transport
costs.  This is a
medium-term project
which would aim to
report back on findings
by summer / autumn
2026.
David McArthur /
Craig Daly
ONGOING Summer /
Autumn 2026
4
Page 9 of 254

Page 10

No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
33 22 April 2026
Item 6
Review of the
Planning
Enforcement
Charter
Elected Member
briefing note to be
circulated to all
members providing
statistical data on the
number of allegations of
planning breaches
made, ratio of how
many are investigated /
decision is no breach /
resolved amicably / end
up at enforcement
stage involving legal
action, and the number
of Stage 1 / 2
complaints or SPSO
level complaints on
planning enforcement
matters.
Information circulated
to all Elected Members
via EM Briefing Note
(072-26) on 23 June
2026. 
K Smith /
S Panton
COMPLETE 26 August
2026
34. 22 April 2026
Item 7
Commercial
Property
Investment
Programme
(CPIP) Progress
Update
Further information to
be provided on the
balance of the spend
between Perth City and
the rural areas and
whether it reflects the
75% / 25% split of the
demand.
Update provided by
Richard Dobson,
Physical Infrastructure
Project Manager
forwarded to
Committee Members
via email on 7 August
2026.
J Janes /
R Dobson
COMPLETE 26 August
2026
35. 22 April 2026
Item 7
Commercial
Property
Investment
Programme
(CPIP) Progress
Update
Further information to
be provided on the
Compulsory Purchase
Orders at Station Road,
Birnam and Fonab
Business Park,
Pitlochry once they are
agreed.
Update provided by
Richard Dobson,
Physical Infrastructure
Project Manager
forwarded to
Committee Members
via email on 7 August
2026.
J Janes /
R Dobson
COMPLETE 26 August
2026
Page 10 of 254

Page 11

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure Committee 
Date of Meeting: 26 August 2026 
Report Title: Council Support to Businesses 
Report Number: 26/219 
Report Author: Kirsty Easton, Business Growth Team Leader 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to provide Committee with details of progress
made to build on and improve the Council’s business-friendly approach to
business engagement. It demonstrates how intelligence-led engagement
supports business growth, investment, resilience and delivery of the Perth and
Kinross Economic Action Plan. 
1.2 The report outlines how the Council builds relationships with businesses,
gathers business intelligence, coordinates support across Council services
and partner organisations, and promotes Perth and Kinross as a business-
friendly location in which businesses can start up, invest and grow. 
1.3 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact and Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the content of the report and the progress made to build on and
improve the Council’s business-friendly approach via business engagement.
5
Page 11 of 254

Page 12

2.2 Agrees the future priorities for business engagement as detailed in the report. 
3. Background/Context 
3.1  At its meeting on 27 August 2025, this Committee agreed to build on and
improve the Council’s business-friendly approach and create a supportive
environment with our partners to improve our strong business start-up and
growth performance (Report 25/11 refers). This approach is recognised and a
key element of achieving the ambitions set out in the Perth and Kinross
Economic Action Plan and wider Tay Cities regional strategies and investment
programmes.   
3.2 Businesses are fundamental to the prosperity of Perth and Kinross. They
generate employment, investment and wealth, strengthen local supply chains
and contribute significantly to the area’s economic resilience and long-term
prosperity. 
3.3 Business engagement is much more than responding to enquiries. It is about
developing trusted relationships with businesses, understanding their
ambitions and challenges, gathering economic intelligence and ensuring
businesses receive coordinated support throughout their lifecycle. 
3.4 The Council gathers business intelligence through both formal and informal
engagement, ensuring business feedback directly informs economic
development priorities and future service delivery. By understanding the
issues affecting businesses, the Council is better placed to anticipate
opportunities, identify emerging challenges and respond proactively. 
3.5 This intelligence-led approach supports delivery of the Tay Cities Regional
Economic Strategy and Prospectus for Regional Growth (2025-2035) and
Perth and Kinross Economic Action Plan (2025-2030) and contributes to the
Council’s ambition of creating a strong, resilient and sustainable local
economy. Business engagement is not an end in itself; it enables the Council
and its partners to move from reacting to individual enquiries towards
anticipating business needs, identifying opportunities for growth,
understanding barriers to investment and ensuring that economic
development priorities are informed by real-time business intelligence. It is an
integral part of the customer-focused approach identified by Perth and Kinross
Economic Partnership in the Perth and Kinross Economic Action Plan. This
proactive approach helps safeguard jobs, supports investment, strengthens
business confidence and reinforces Perth and Kinross’ reputation as a
business-friendly location in which businesses can invest and grow. 
4. Main Issues 
Business Relationship Management 
4.1 The Business Growth Team leads the Council’s strategic engagement with
businesses across Perth and Kinross. 
4.2 A key element of this approach is the Top 100 Business Engagement
Programme. The Top 100 Businesses are identified using a range of
Page 12 of 254

Page 13

measures including business turnover, employment and future growth
potential. The programme enables the Council to focus relationship
management on businesses that make a significant contribution to the local
economy whilst also supporting businesses with strong growth potential and
opportunities for future job creation. 
4.3 The programme was originally developed using Companies House data
provided through expert advice to identify businesses with significant turnover.
This information was subsequently reviewed and refined to ensure the
programme reflects businesses with a substantive operational presence within
Perth and Kinross. The list will continue to evolve through ongoing
engagement, with additional businesses considered where there is evidence
of significant employment, operational activity or future growth potential. 
4.4 Within the current programme, there are a broad range of sectors including
tourism and hospitality, food and drink, manufacturing, agriculture,
renewables, construction, professional services and financial services. 
4.5 Each business has been allocated a dedicated Business Lead Officer,
providing a consistent point of contact and enabling officers to build detailed
knowledge of individual businesses, their investment aspirations, growth plans
and barriers to development. 
4.6 Officers are currently engaging with all businesses listed in the programme.
Targeting business support to our key growth sectors and businesses helps to
identify opportunities for investment, expansion and job creation while
allowing the Council to respond proactively where support may be required. 
This approach helps to maintain strong performance in business survival rates
(4th highest business survival rate in Scotland) and growth potential (top local
authority area in the UK for business growth potential 2025 – Growth Flag). 
4.7 Alongside the Top 100 Business Engagement Programme, the Council also
engages with businesses of all sizes, including start-ups, SMEs, inward
investors and businesses seeking advice on land, commercial property,
investment opportunities and wider economic development matters. 
Intelligence-led Engagement 
4.8 In January 2025, the Business Growth Team introduced a bespoke Customer
Relationship Management (CRM) system with expert advice to support
business engagement activity. 
4.9 The CRM provides a central record of business interactions, enquiries and
follow-up actions, enabling the Council to coordinate engagement activity,
build corporate knowledge and avoid duplication across services. Although
the Economic Development service has led the initiative, strong engagement
has been secured across Council services. This has resulted in a more
coordinated approach to business engagement, improving efficiency for both
the Council and local businesses. An evaluation of the CRM system is
scheduled for January 2027 to assess its impact, identify case studies, and
capture key learning. 
Page 13 of 254

Page 14

4.10 The CRM currently contains records for: 
• 73 business enquiries
• 73 business engagements
• 23 land and property enquiries
• 25 referrals and signposting interventions
• 6 inward investment enquiries 
4.11 The Council will continue to develop the CRM system and maximise future
integration opportunities with the national Master Customer Record (MCR)
being developed through the Business Support Partnership (BSP). 
4.12 The Business Support Partnership is a collaboration of Scotland's national
and local business support organisations, working together to provide a more
joined-up, accessible and customer-focused support system for businesses.
Its aim is to simplify access to advice, funding and growth support, helping
businesses across Scotland achieve their ambitions. 
4.13 To support consistency of engagement, the Business Growth Team 
has developed a Business Engagement Framework and officer checklist. 
Whilst not intended to be a prescriptive questionnaire, it provides a structured 
approach to business conversations, helping officers gather intelligence on 
business performance, workforce requirements, property needs, investment 
intentions, exporting, innovation and net zero ambitions. This intelligence
supports more effective signposting, coordinated interventions and improved
customer service. 
4.14 Business intelligence gathered through engagement has identified several
recurring themes affecting local businesses, including: 
• access to finance and investment;
• redevelopment of vacant properties;
• workforce recruitment and expansion;
• availability of employment land and commercial premises; and
• navigating planning and other regulatory processes. 
4.15 Understanding these themes enables the Council and its partners to target
support more effectively while informing future economic development
priorities and service improvements. 
4.16 Information gathered through business engagement is shared, where
appropriate, across Council services and with strategic partners to help shape
economic priorities, identify emerging trends and inform future investment
decisions. This intelligence also supports delivery of the Perth and Kinross
Economic Action Plan by ensuring that economic interventions continue to
reflect the changing needs of businesses across Perth and Kinross. 
Creating a Business-Friendly Council 
4.17 Businesses do not always know which Council service they require or who
they should contact. The Business Growth Team therefore provides a single
point of contact for businesses engaging with the Council, coordinating
Page 14 of 254

Page 15

support across services including Planning, Property, Roads, Licensing,
Procurement, Employability and other services where appropriate. In August
2025 officers committed to establishing a ‘Business-friendly’ Cross-Service
Officer Group.  This is now in place and include Officers who interface with
businesses. The Group has a flexible and agile membership and Officers can
be mobilised to reply to one-off requests or to deal with emergencies. The
Group identifies areas of improvement on an on-going basis. 
4.18 This coordinated approach improves the customer experience, helps
businesses navigate Council processes, removes barriers where possible and
ensures businesses receive clear communication throughout their
engagement with the Council.  Feedback from businesses has been positive. 
This will be reflected in our review of the CRM system, and approved case
studies from businesses will be included. 
4.19 Regular business meetings, site visits and tours also allow officers to better
understand business operations, investment plans and future ambitions while
strengthening relationships with key employers across Perth and Kinross.
Early engagement also enables the Council to identify potential barriers
before they become constraints to business growth, allowing support to be
coordinated at the earliest opportunity and helping businesses progress
investment more efficiently. 
4.20 Whilst this report focuses on business engagement, specialist one-to-one
business advice is primarily delivered through partner organisations including
Business Gateway, GrowBiz or Scottish Enterprise. The Council’s role is to
build relationships with businesses, gather intelligence, coordinate activity
across Council services and ensure businesses are connected to the most
appropriate specialist support. 
Strategic Engagement and Business Promotion 
4.21 Business engagement extends beyond individual meetings and includes a
programme of wider engagement activity designed to understand sector
priorities, encourage collaboration and promote economic opportunities. 
4.22 In the last year, the Council has delivered two business breakfasts and three
business roundtable discussions covering general business, farming and
agriculture, and estates and landowners. These discussions provide valuable
opportunities to understand sector-specific opportunities and challenges while
ensuring business feedback informs future priorities.  Feedback from these
events, including the need for tailored business support packages, a stronger
focus on rural skills development, and investment to support the transition to a
low-carbon economy, helped shape our Tay Cities Local Growth Fund
Investment Plan. In turn, this programme of investment will help to address
the challenges identified through engagement and maximise the opportunities
highlighted by local businesses and stakeholders. 
4.23 Business intelligence is also gathered through surveys, consultations and
targeted engagement exercises undertaken throughout the year, ensuring that
a broad range of business views help inform future policy development,
service improvement and economic priorities.
Page 15 of 254

Page 16

4.24 Sector-specific engagement has also been supported through programmes
including Perthshire Talks Tourism, Trade Ready export training and
Accessible and Inclusive Tourism training, engaging several hundred
businesses across priority sectors.  Feedback has been positive and helped
to inform the tailored support that will be available through programmes such
as the Local Growth Fund. 
4.25 The Council also promotes businesses and investment opportunities through
Invest in Perth, the Council’s inward investment brand, Invest in Perth
Magazine, the Business & Economy Bulletin, the Invest in Perth website,
social media, business case studies and the Perth City and Towns website,
where businesses can promote themselves through a free online business
directory. 
4.26 These communication channels not only promote individual businesses and
investment opportunities but also help position Perth and Kinross as an
attractive, connected and business-friendly location in which to start, invest
and grow a business. 
4.27 The Business & Economy Bulletin currently has over 1,400 subscribers with
an average open rate of approximately 30%, demonstrating strong
engagement with the local business community. 
4.28 Between January 2025 and July 2026, the Invest in Perth website recorded
approximately 98,000 page views, while business-focused LinkedIn activity
generated over 3.3 million views, highlighting the significant reach of the
Council’s business communications. 
4.29 Building on this collaborative approach, the inaugural Perth and Kinross
Economic Summit will take place on 9 September 2026, bringing together
businesses, public sector partners and stakeholders. Discussions will explore
how the region builds economic resilience, strengthens skills and workforce
development, unlocks investment, improves infrastructure, supports
sustainable growth through clean innovation, and maximises opportunities
within the rural economy.  The Summit is being supported by SSE as headline
sponsor. 
Partnership Working 
4.30 The Council works closely with a wide range of local, regional and national
partners to support businesses across Perth and Kinross. 
4.31 Business representative organisations including Perthshire Chamber of
Commerce, the Federation of Small Businesses, Perth and Kinross Business
Partnership and Perthshire Tourism Partnership provide valuable insight into
collective business priorities and emerging economic issues. These
relationships are complemented by sector-specific engagement, business
forums and roundtable discussions. 
4.32 The Perth and Kinross Economic Partnership provides the strategic forum
through which businesses, representative organisations and public sector
Page 16 of 254

Page 17

partners work collaboratively to shape economic priorities and oversee
delivery of the Perth and Kinross Economic Action Plan. 
4.33 The Partnership has also developed a Business Champions initiative to
strengthen engagement with the local business community and demonstrate
its customer-focused approach. The initiative brings together respected
business leaders from across Perth and Kinross to act as ambassadors for the
region, promote the Economic Action Plan, support inward investment activity
and provide practical business insight to help inform future priorities. Business
Champions will also support delivery of engagement activity including
roundtable discussions, business events, place promotion and the inaugural
Perth and Kinross Economic Summit.   
4.34 Business intelligence gathered through direct engagement is shared, where
appropriate, to help inform partnership priorities, influence policy development
and strengthen collaborative approaches to supporting economic growth. This
ensures that local business perspectives continue to shape collective
decision-making and the delivery of shared economic priorities across Perth
and Kinross. 
5. Proposals 
Future Priorities 
5.1 The Council will continue to build and improve on its business-friendly
approach via business engagement by: 
• developing long-term relationships with businesses across Perth and
Kinross;
• continuing to enhance the use of CRM and business intelligence;
• strengthening collaboration across Council services and partner
organisations;
• expanding strategic engagement through business events, roundtables
and the Economic Summit;
• promoting Perth and Kinross as a business-friendly location for
investment and growth;
• continuing to strengthen the evidence base through business
engagement, surveys and intelligence gathering to inform future policy
and investment decisions; and
• using business intelligence to inform future economic development
priorities and service delivery. 
6. Conclusion 
6.1 Business engagement is not an end in itself; it is the mechanism through
which the Council builds relationships, gathers economic intelligence,
coordinates support and helps create the conditions for sustainable business
growth across Perth and Kinross. 
6.2 By developing trusted relationships with businesses, providing a coordinated
approach across Council services and working collaboratively with partner
organisations, Perth and Kinross Council is well placed to understand
Page 17 of 254

Page 18

business needs, respond proactively to emerging opportunities and
challenges, and support a resilient, competitive and growing local economy. It
is a key element to build and improve on the Council’s business-friendly
approach. As the Council continues to strengthen relationships with
businesses and partners, business engagement will remain central to
understanding the needs of the local economy, shaping future priorities and
ensuring Perth and Kinross continues to be recognised as an attractive,
supportive and business-friendly location in which businesses can invest,
innovate and grow. 
7. Impact and Value Assessment 
This is an operational report, and as such, no further assessment is required. 
8. Appendices 
8.1 None 
Page 18 of 254

Page 19

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure Committee 
Date of Meeting: 26 August 2026 
Report Title: Business Support Review 
Report Number: 26/220 
Report Author: Kirsty Easton, Business Growth Team Leader 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to present the findings of a strategic review of
business support services across Perth and Kinross and to seek approval for
the future direction of business support services, including the preferred future
delivery model for Business Gateway. 
1.2 The review was undertaken in response to a decision of the Economy and
Infrastructure Committee to review Business Gateway arrangements.
Recognising that Business Gateway forms one element of a wider business
support ecosystem, the review examined the effectiveness of business
support provision across Perth and Kinross to ensure future decisions are
informed by a comprehensive assessment of business needs, service
performance and partnership working. 
1.3 The review assessed the strength of the Perth and Kinross business base, the
effectiveness of current business support interventions, the performance of
funded business support services, and opportunities to strengthen future
provision. It also considered the contribution of business support to wider
Council priorities, including economic growth, entrepreneurship, Community
Wealth Building and inclusive economic growth. 
1.4 The report presents the findings of the review, identifies key strengths,
opportunities and priorities for improvement, and sets out an evidence-based
options appraisal for the future delivery of Business Gateway. 
1.5 Sections 
1. Purpose
2. Recommendation(s)
6
Page 19 of 254

Page 20

3. Background/Context
4. Review Scope, Methodology and Assessment Criteria
5. The Perth and Kinross Business Base
6. The Business Support Landscape
7.  Business Performance Data and Benchmarking
8. Business Survey Findings
9.  Council-Led Business Support and Partnership Working
10.  Funded business support services
11.  Key Review Findings
12. Future delivery of Business Gateway
13. Future Focus
14.  Conclusion
15. Impact and Value Assessment
16. Appendices 
2. Recommendation(s) 
It is recommended that Committee: 
2.1 Approves Option 4 – Continuation of the Regional Business Gateway Delivery
Model with Enhanced Local Delivery Priorities as the Council’s preferred
future delivery model, recognising that the Business Support Review found no
evidence to support fundamental restructuring of the current regional delivery
arrangements. 
2.2 Agrees that Perth and Kinross Council continues to participate in the regional
Business Gateway delivery model and works with Business Gateway,
GrowBiz and wider local, regional and national partners to strengthen the
business support ecosystem and deliver the priorities identified through this
review. 
2.3 Agrees that Perth and Kinross Council seeks greater integration of the
activities delivered by GrowBiz and other partners into the regional Business
Gateway delivery model to sustain and improve business support ecosystem
throughout 2026/2027 and 2027/2028. 
3. Background/Context 
3.1  A strong, productive and resilient business base is fundamental to achieving
sustainable economic growth across Perth and Kinross. Businesses create
employment, drive innovation, support local supply chains, attract investment
and contribute significantly to the wellbeing and prosperity of communities
across both urban and rural areas. 
3.2 The Tay Cities Regional Economic Strategy and Prospectus for Regional
Growth (2025-2035) and Perth and Kinross Economic Action Plan (2025-
2030) identify business growth, entrepreneurship, innovation and investment
as key priorities. Delivering these ambitions requires businesses of all sizes
and sectors to have access to co-ordinated, responsive and effective
business support throughout every stage of the business lifecycle. 
Page 20 of 254

Page 21

3.3 At its meeting on 27 August 2025, the Economy and Infrastructure Committee
considered the Council Support to Businesses report (Report 25/211), which
highlighted the broad range of support provided by the Council and
recognised the importance of ensuring businesses experience a coordinated
and business-friendly approach across Council services. As part of that
report, the Committee agreed that officers undertake a review of Business
Gateway contract arrangements and report back to this committee with
recommendations on the future delivery of the service before the expiry of the
current regional contract. 
3.4 As part of this review, officers considered whether the existing Business
Gateway delivery model continued to meet the needs of businesses and
represented the most effective and efficient approach for the future. Given
that Business Gateway operates as one element of a wider business support
ecosystem, officers considered it appropriate to undertake a broader strategic
review to ensure that any future recommendations were informed by a
comprehensive assessment of business support provision across Perth and
Kinross. 
3.5 Businesses increasingly access support from a range of local, regional and
national organisations and often engage with multiple providers throughout
their business lifecycle. The review therefore examined how the business
support ecosystem currently operates, its effectiveness in meeting business
needs, and where opportunities exist to strengthen future business support
provision. 
3.6 Since the previous report, the business support landscape has continued to
evolve. Businesses continue to face challenges associated with inflationary
pressures, recruitment and skills shortages, digital transformation, changing
consumer demand, the transition to net zero and wider economic uncertainty.
At the same time, opportunities have emerged through increased regional
collaboration, investment programmes and the Tay Cities Region Local
Growth Fund. Against this backdrop, it was important to consider whether
current business support arrangements remain fit for purpose and capable of
responding to the evolving needs of businesses across Perth and Kinross. 
3.7 The review sought to answer four key questions:  
• Does Perth and Kinross have a strong and effective business support
ecosystem?
• Are current business support interventions meeting the needs of
businesses?
• Where are the current strengths, gaps and future opportunities for
business support?
• What is the most appropriate future delivery model for Business Gateway? 
3.8 These questions established the scope of the review and provided the
framework against which the effectiveness of the current business support
ecosystem and future Business Gateway delivery options were assessed. The
review considered business support provided directly by Perth and Kinross
Council, Business Gateway, GrowBiz and wider regional and national
Page 21 of 254

Page 22

partners. The review methodology and assessment framework are set out in
Section 4. 
4. Review Scope, Methodology and Assessment Criteria 
Review Scope 
4.1  The review examined: 
• the strength and resilience of the Perth and Kinross business base;
• business support delivered directly by Perth and Kinross Council;
• Business Gateway performance and delivery arrangements;
• GrowBiz performance and specialist business support;
• the contribution of regional and national partners;
• partnership working across the business support ecosystem;
• business needs and customer experience; and
• future opportunities to strengthen business support provision. 
4.2 Review Methodology 
The review was undertaken in four stages. 
Discovery 
• mapping the current business support ecosystem;
• identifying organisations delivering business support; and
• reviewing respective roles, responsibilities and funding arrangements. 
Evidence Review 
Evidence was gathered from a range of quantitative and qualitative sources,
including: 
• analysis of the Perth and Kinross business base;
• Business Gateway performance information;
• GrowBiz performance information;
• business engagement activity undertaken by Perth and Kinross
Council;
• a Business Support Survey undertaken during 2026;
• benchmarking against other Scottish local authorities using Scottish
Local Authority Economic Development (SLAED) performance
indicators;
• consideration of business support delivery models across Scotland;
and
• wider economic intelligence and business performance data. 
4.3 Stakeholder Engagement 
Engagement was undertaken with: 
• local businesses through the Business Support Survey;
• local, regional and national business support partners; and
• relevant Council services involved in supporting businesses.
Page 22 of 254

Page 23

Assessment 
Evidence gathered through the review was assessed to identify: 
• strengths within the current business support ecosystem;
• gaps and opportunities for improvement;
• areas of duplication or overlap;
• emerging business needs;
• future priorities for business support; and
• the most appropriate future delivery model for Business Gateway. 
4.4  Assessment Criteria 
Business support arrangements and future delivery options were assessed
against the following criteria: 
• strategic fit and alignment with local, regional and national economic
priorities;
• business performance and outcomes;
• value for money;
• customer experience and accessibility of support;
• partnership working and collaboration;
• contribution to entrepreneurship, inclusive economic growth and
Community Wealth Building; and
• future flexibility, deliverability and sustainability. 
The same assessment criteria informed the options appraisal presented in
Section 12 and Appendix 3, ensuring the preferred option is supported by a
consistent and evidence-based assessment framework. 
5. The Perth and Kinross Business Base 
5.1 Perth and Kinross has a diverse, resilient and entrepreneurial business base
that makes a significant contribution to economic growth, employment and
investment across the area. The local economy is home to more than 5,600
registered businesses, alongside a substantial number of sole traders and
self-employed individuals operating across both urban and rural communities. 
5.2 The area benefits from recognised strengths across several key growth
sectors, including food and drink, tourism, financial and business services,
creative and digital industries, energy transition and the circular economy.
These sectors are central to the area's future economic development and are
reflected in both the Perth and Kinross Economic Action Plan and wider
growth and investment propositions. 
5.3 Importantly, Perth and Kinross is not dependent on a single dominant
industry. This sectoral diversity contributes to the resilience of the local
economy, supports economic stability and creates opportunities for
sustainable growth, innovation and investment across a broad range of
sectors. 
Page 23 of 254

Page 24

5.4 Current business intelligence demonstrates the strength and growth potential
of the local business base. 
5.5 Key indicators include: 
• approximately 5,639 registered businesses, supported by a further
estimated 6,900 sole traders and non-limited businesses;
• 99.7% of registered businesses are SMEs (Small or Medium-sized
Enterprises with fewer than 250 employees);
• Only 0.3% are classified as large enterprises (250+ employees)
• approximately 58% of businesses operate within rural areas, reflecting the
importance of the rural economy to Perth and Kinross;
• an average business age of 11.35 years, significantly higher than the UK
average of around 8 years and good business survival rates after 3 years
and 5 years of existence, indicating a relatively mature and established
business base;
• Strong business growth prospects, with Perth and Kinross ranked by
Growth Flag as the highest performing local authority area in the UK for
business growth potential both 2024 and 2025. Growth Flag analysis
indicates that 11.4% of businesses are forecast to achieve growth of more
than 20% over the next year, exceeding the UK average. 
Sources: Growth Flag, The State of Growth Report (2025); ONS UK Business Counts; Perth
and Kinross Economic Action Plan Evidence Base (Invest in Perth Website) 
5.6 Whilst overall business performance remains strong, analysis highlights both
significant opportunities and emerging risks within the Perth and Kinross
business base. 
5.7 The evidence identifies a substantial cohort of businesses with strong growth
potential, underlining the importance of policies and interventions that support
SMEs productivity, innovation, scale-up and market expansion. At the same
time, a smaller group of businesses are exhibiting signs of financial distress,
reinforcing the need for targeted support that strengthens business resilience,
adaptability and long-term sustainability. 
Review Findings 
5.8 The review found that Perth and Kinross benefits from a strong, diverse and
resilient business base characterised by high levels of entrepreneurial activity,
above-average business survival rates and significant growth potential. The
evidence demonstrates that the local economy is well positioned to support
sustainable economic growth and compares favourably with national and
comparator authority performance. 
5.9 Whilst the overall business base performs strongly, the review identified
opportunities to further strengthen support for businesses with high growth
potential, improve productivity and innovation, and continue supporting
business resilience in response to changing economic conditions. 
Page 24 of 254

Page 25

Key Conclusions 
5.10 The findings demonstrate that the current business support ecosystem is
supporting a strong and resilient business base. Future business support
should therefore focus on building on these strengths by increasing support
for entrepreneurship, innovation, investment, productivity and business scale-
up, whilst continuing to provide accessible support for businesses at every
stage of the business lifecycle. 
Business lifecycle 
5.11 Maintaining a healthy and resilient business base requires support at every
stage of the business lifecycle. This includes fostering entrepreneurship and
business creation; supporting business start-up and survival; enabling early-
stage growth; driving innovation, productivity and competitiveness; helping
businesses to scale up, access new markets and export opportunities, and
ensuring businesses have access to the skills, finance, premises and
infrastructure needed to grow and mature. This is illustrated by the diagram
below. 
Business Support, Inclusive Growth and Tackling Poverty 
5.10 Business support is not solely about helping businesses succeed. It is also a
key enabler of inclusive economic growth and supports the Council’s ambition
of enabling everyone to live life well, free from poverty and inequality.
Encouraging entrepreneurship and self-employment can create pathways for
individuals to increase household income, develop new skills and secure
sustainable livelihoods. Start-up support can be particularly valuable for
people seeking flexible employment, those living in rural communities and
individuals who may face barriers to more traditional routes into employment. 
5.11 Supporting existing businesses to innovate, improve productivity and grow
also contributes to inclusive growth by creating new jobs, strengthening local
supply chains and increasing investment and expanding opportunities for local
people within or accessible from the communities where they live. As
businesses develop and mature, they generate employment opportunities
across a wide range of sectors and skills levels, helping to build a stronger,
Page 25 of 254

Page 26

more resilient and more inclusive local economy. This is particularly the case
for anchor businesses and larger employers, which have the capacity to
generate wider economic and social value through local procurement,
workforce development, community wealth building approaches and
investment in local supply chains. 
Review Findings 
5.12 The review confirms that business support plays an important role not only in
supporting business success, but also in delivering wider Council priorities,
including inclusive economic growth, Community Wealth Building and tackling
poverty through increased employment, entrepreneurship and local supply
chain development. 
6. The Business Support Landscape 
6.1 Business support should not be viewed simply as a collection of individual
services, but rather as a coordinated ecosystem of interventions that
contributes to economic growth, business competitiveness, investment,
employment, social inclusion and poverty reduction. 
6.2 Businesses in Perth and Kinross can access support from a broad range of
local, regional and national organisations, each providing different
interventions at various stages of the business lifecycle. Collectively, these
organisations form a comprehensive business support ecosystem, offering
services ranging from entrepreneurship and start-up support through to
business growth, innovation, skills development, investment readiness,
exporting and specialist sector assistance. 
6.3 A detailed overview of the current business support ecosystem, including the
principal delivery partners, their respective roles and the support available to
businesses, is provided in Appendix 1. 
Evidence 
6.4 The review found that businesses frequently engage with multiple
organisations as they grow and develop. Evidence gathered through the
Business Support Survey, partner engagement and ecosystem mapping
indicates that support organisations generally work well together and provide
complementary services across the business lifecycle. 
6.5 Whilst the breadth of support available is a significant strength, businesses
reported that the overall landscape can sometimes be difficult to navigate.
This does not reflect a lack of provision or unnecessary duplication of
services. Rather, it highlights the importance of effective signposting, strong
referral pathways and coordinated communication between providers to
ensure businesses are directed to the right support at the right time. 
Review Findings 
6.6 The review found that Perth and Kinross benefits from a comprehensive and
well-established business support ecosystem. The respective roles of Perth
Page 26 of 254

Page 27

and Kinross Council, Business Gateway, GrowBiz and national agencies are
generally complementary, providing businesses with access to support
throughout the business lifecycle. 
6.7 The review found no evidence of significant duplication or structural gaps
within the current business support ecosystem. Instead, the principal
opportunity for improvement relates to making the existing ecosystem easier
for businesses to understand and access through stronger partnership
working, clearer customer journeys and improved referral arrangements. 
Key Conclusions 
6.8  Future improvements should focus on stronger coordination, clearer customer
journeys and enhanced referral pathways. 
6.9 These findings also informed the subsequent assessment of future Business
Gateway delivery options. As the review found no evidence of significant
duplication or structural weaknesses within the current business support
ecosystem, the options appraisal focused on identifying the delivery model
best placed to strengthen existing arrangements rather than replace them. 
7.  Business Performance Data and Benchmarking 
7.1 Business support performance was benchmarked using the SLAED
Performance Framework and compared against Perth and Kinross’s Local
Authority Family Group and the Scottish average. 
Indicator Perth &
Kinross
Family
Group Scotland
Business start-ups per 10,000 working-age
population 50 44 51
Three-year business survival rate (born
2021 still active in 2024) 62.3% 58.4% 57.6%
Five-year business survival rate (born 2019
still active in 2024) 47.3% NA 44%
Business Gateway-supported start-ups still
trading per annum 254 210 213
Business Gateway unique customer
accounts per annum 1,809 1,440 1,584 
* Councils in PKC’s ‘Local Authority Family Group’:  East Ayrshire, East
Lothian, Fife, Moray, North Ayrshire, South Ayrshire and Stirling 
Review Findings 
7.2 The review found that Perth and Kinross performs strongly relative to
comparable local authority areas and continues to outperform comparator
Page 27 of 254

Page 28

averages across a number of key measures relating to business start-up
activity, business survival and business support engagement. 
7.3 The evidence indicates that the current business support ecosystem is
contributing positively to the strength, resilience and growth of the local
business base. Benchmarking also demonstrates that existing arrangements
are delivering positive outcomes for businesses and compare favourably with
both the Local Authority Family Group and Scotland as a whole. 
Key Conclusions 
7.4 The benchmarking evidence provides assurance that the current business
support ecosystem is performing effectively and supporting positive business
outcomes. The review found no evidence that fundamental changes to
existing business support arrangements are required on the basis of
performance. Instead, future activity should focus on building on existing
strengths, addressing identified opportunities for improvement and ensuring
support continues to evolve in response to changing business needs. 
7.5  Whilst benchmarking provides a valuable comparison of performance
outcomes, it has been considered alongside business engagement, survey
findings, service performance information and partner feedback to provide a
balanced assessment of the effectiveness of current arrangements. 
8. Business Survey Findings 
8.1 To inform the review, Perth and Kinross Council undertook a Business
Support Survey during 2026 to better understand business experiences,
awareness of support services and future support requirements.  
Survey Overview 
8.2 Twenty-five businesses responded, representing a range of sectors, locations
and business sizes. 
8.3 Whilst the sample size is relatively modest and should not be regarded as
statistically representative of the wider business community, the findings
provide valuable qualitative insight into business experiences, perceptions
and future priorities. The survey findings have been considered alongside
business engagement activity, partner discussions, benchmarking information
and service performance data to inform the overall conclusions of the review. 
8.4 Key findings include: 
• approximately two-thirds of respondents had accessed business support
during the previous year;
• Business Gateway and GrowBiz were the most frequently used funded
services;
• businesses valued one-to-one advice, mentoring and networking
opportunities;
• overall satisfaction with business support was positive;
Page 28 of 254

Page 29

• businesses identified funding, business growth, digital support and
networking as continuing priorities;
• respondents highlighted opportunities to improve awareness of available
support and simplify the customer journey.   
Review Findings 
8.5 The review found that businesses recognise the breadth and quality of
support available across Perth and Kinross and place particular importance on
personalised advice delivered through trusted local organisations. The
findings also reinforce the importance of maintaining accessible support
throughout the business lifecycle. 
8.6 Whilst the survey identified opportunities to improve awareness of available
support and make the business support landscape easier to navigate, it did
not identify significant gaps in provision and highlighted opportunities to
improve awareness and navigation of support services. 
Key Conclusions 
8.7 The survey findings suggest that future improvements should focus on
strengthening communication, simplifying customer journeys and improving
referral pathways between business support providers. These findings support
the review's wider conclusion that future effort should concentrate on
enhancing the effectiveness of the existing ecosystem rather than
restructuring current delivery arrangements. 
9.  Council-Led Business Support and Partnership Working 
9.1 Whilst funded business support services play an important role, Perth and
Kinross Council also delivers a wide range of interventions that create the
conditions for business start-up, growth, investment and long-term economic
resilience. These include business intelligence and engagement, account
management, inward investment, commercial property, infrastructure,
planning and partnership working. Collectively, these activities support
entrepreneurship, business growth, employment and inclusive economic
development. 
Business Intelligence and Business Engagement 
9.2 Understanding business needs is fundamental to effective support. The
Council gathers intelligence through its CRM system, the Top 100 Business
Programme, Business Lead Officers, Growth Flag analysis, business visits,
surveys and ongoing engagement with businesses and partners. This helps
identify opportunities and barriers to growth, informs economic priorities and
ensures businesses are directed to the most appropriate support. The
Council’s wider approach to business engagement is set out in the
accompanying report “Council Support to Businesses” (Report 26/219).    
Page 29 of 254

Page 30

Council-wide Business Support 
9.3 Businesses engage with a wide range of Council services, including Planning,
Building Standards, Licensing, Environmental Health, Roads, Property
Services, Procurement and Employability. The Council's Business Friendly
Cross-Service Group helps coordinate support across services, improving
responsiveness and creating a more business-friendly environment. 
Investment and Business Growth Interventions 
9.4 The Council delivers a range of direct interventions to stimulate investment
and business growth, including commercial property investment (eg
Commercial Property Investment Programme), employment land
development, inward investment activity (eg Angel’s Share investment
programme), grants (eg Green Capital Grant, Beyond Scotland Market
Development Grant), recruitment incentives and regeneration programmes. 
Between 2024 and 2026, these interventions supported more than 190
businesses and employers, created over 110 jobs, awarded more than £1.2
million in grant funding and leveraged almost £9 million of private sector
investment. These investments play an important role in supporting
productivity, innovation, job creation and business resilience. 
Partnership Working and Regional Collaboration 
9.5 The Council works closely with Business Gateway, GrowBiz, Scottish
Enterprise, Scottish Development International, Skills Development Scotland,
VisitScotland, the Supplier Development Programme and local business
organisations to provide coordinated support at various stages of the business
lifecycle. 
9.6 This partnership approach strengthens referral pathways, reduces duplication
and improves access to specialist advice. Strategic leadership is provided
through the Perth and Kinross Economic Partnership, while Invest in Perth
remains the principal platform for promoting business support and investment
opportunities. 
Review Findings 
9.7 The review found that Perth and Kinross Council plays a significant leadership
and coordination role within the wider business support ecosystem. In addition
to delivering direct interventions, the Council brings together partners,
facilitates referrals, supports investment and ensures that businesses can
access a coordinated range of services throughout their lifecycle. 
9.8 The review also found that partnership working is a key strength of the current
model. Perth and Kinross Council, Business Gateway, GrowBiz and national
agencies fulfil complementary roles and work collaboratively to provide
businesses with access to specialist advice and support. This collaborative
approach reduces the risk of duplication and enables businesses to benefit
from a broader range of expertise than could be delivered by any single
organisation. 
Page 30 of 254

Page 31

Key Conclusions 
9.9 The findings demonstrate that future improvements should build upon existing
partnership arrangements rather than introduce fundamental structural
change. Continued collaboration will be essential to maximise the
opportunities presented through the Tay Cities Region Local Growth Fund
and to ensure business support remains responsive to changing economic
conditions and business needs. 
Future Opportunities and Regional Collaboration 
9.10 The business support landscape will continue to evolve in response to
changing economic conditions and business needs. Continued collaboration
with local, regional and national partners will be essential to ensure
businesses can access high-quality support. 
9.11 The Tay Cities Region Local Growth Fund presents a significant opportunity
to strengthen business support over the next two and a half years, with
£2.385 million allocated to business growth, innovation, exporting, digital
adoption, supply chain development, capital investment and net zero
transition activity across the Tay Cities region. 
9.12 Additional Tay Cities investment will support tourism and visitor economy
initiatives, employer engagement and stronger links between businesses,
skills providers and wider economic development partners. This investment
provides an opportunity to review existing funded business support services. 
10.  Funded business support services 
Business Gateway delivered by Elevator 
10.1 Business Gateway is the Council’s primary funded business support service
for business start-up and early-stage growth. 
10.2 The service is delivered regionally across Tay Cities Region through a
procured contract funded centrally by the Scottish Government. Delivery
forms part of the national Business Gateway framework coordinated through
COSLA’s Business Gateway National Unit. Dundee City Council is the Lead
Authority for the contract and there is a Memorandum of Understanding
between Angus Council, Dundee City Council and Perth and Kinross Council.
The regional contract value for 2026/27 is £1.2m and is delivered by Elevator.
The current contract expires in March 2027, with an option to extend for a
further year to March 2028. 
10.3 Performance during 2025/26 remained strong. 
10.4 Headline achievements include: 
• Perth and Kinross recorded 285 business start-ups, representing a 12.6%
increase on the previous year.
• Perth and Kinross was the only Tay Cities local authority to record an
increase in business start-ups.
Page 31 of 254

Page 32

• Perth and Kinross now accounts for almost 40% of all Business Gateway
business starts across Tay Cities region.
• Business Gateway supported over 1,270 businesses across Perth and
Kinross through diverse activities such as networking events or training
sessions.
• Rural business start-up activity also continued to increase.   
10.5 Business Gateway continues to perform well against national performance
measures and provides an important entry point into the wider business
support ecosystem. Through the national Business Gateway framework,
businesses benefit from a consistent universal offer, whilst regional delivery
enables services to be tailored to local priorities and circumstances. The chart
below summarises the monthly Quality Assurance results based on customer
feedback. The overall score incorporates responses relating to adviser
satisfaction, enquiry handling, the local office experience, benefit outcomes
and whether customers would recommend the service. Throughout the review
period, customer satisfaction remained consistently high, providing further
evidence of the quality and effectiveness of the service. 
10.6 The Quality Assurance results demonstrate consistently high levels of
customer satisfaction and provide additional assurance that Business
Gateway is delivering a high-quality service. Whilst individual feedback
identified opportunities for continuous improvement, the review found no
recurring themes or systemic issues that would indicate concerns regarding
overall service quality or performance. This evidence, together with contract
performance information, benchmarking data and business feedback,
supports the conclusion that Business Gateway continues to perform well and
provides an effective universal business support service. 
GrowBiz 
10.7 The Council also funds GrowBiz to provide specialist support for rural
businesses, micro-businesses, social enterprises, creative industries and
young entrepreneurs. 
10.8 The contract value for 2026/27 is £140,000. During 2025/26, GrowBiz
exceeded contractual targets. The GrowBiz Service Level Agreement (SLA)
was agreed for 3 years and is due to be reviewed in March 2027. 
10.9 Achievements include: 
• an increase in the number of businesses supported from 254 to 302
through diverse activities such as networking events;
Page 32 of 254

Page 33

• Supporting 24 new businesses to start trading, alongside tailored
mentoring and enterprise advice
• expansion of the mentoring programme and peer support networks
• increased engagement with schools and young entrepreneurs;
• continued growth in support for food and drink businesses;
• delivery of peer-to-peer learning and networking opportunities;
• continued support for rural enterprise and community businesses.   
10.10 The review found that GrowBiz provides a specialist offer focused primarily on
rural businesses, micro-businesses, social enterprises, community enterprises
and young entrepreneurs. This complements the wider business support
ecosystem by providing targeted interventions alongside the universal
business support available through Business Gateway and other delivery
partners. The review also identified opportunities to strengthen coordination
between universal and specialist business support, ensuring businesses
experience a seamless customer journey and can access the most
appropriate support at the right stage of their business lifecycle. 
Review Findings 
10.11 The review found that Business Gateway and specialist business support
provision fulfil distinct but complementary roles within the wider business
support ecosystem. Business Gateway provides the Council’s principal
universal business support service, supporting business start-up, early-stage
growth and access to national programmes. Specialist provision provides
additional targeted support for specific customer groups and business needs,
strengthening the overall breadth of support available across Perth and
Kinross. 
10.12 Performance information, benchmarking data, business survey findings and
partner engagement demonstrate that the current model is delivering positive
outcomes for businesses. The review found no evidence that the existing
regional Business Gateway delivery model is underperforming or that
withdrawing from the regional arrangement would improve business
outcomes, represent better value for money or strengthen the wider business
support ecosystem. Instead, the evidence indicates that the greatest
opportunities for improvement lie in strengthening integration, referral
pathways and targeting local investment towards areas of greatest
additionality and strategic value. This reflects the wider findings of the review
and informs the preferred future delivery model considered in Section 12. 
Key Conclusions 
10.13 The review concludes that future Business Gateway commissioning and
partnership arrangements should continue to provide a strong universal
business support offer whilst ensuring that local investment is increasingly
focused on specialist interventions that deliver the greatest additionality and
strategic value. This includes strengthening entrepreneurship, inclusive
enterprise, rural enterprise, support for businesses with high growth potential,
Community Wealth Building outcomes, improved referral pathways and
enhanced collaboration across the wider business support ecosystem. The
review therefore supports greater integration of specialist business support
Page 33 of 254

Page 34

activity with the core Business Gateway offer, whilst retaining flexibility for
future commissioning and partnership discussions. 
11.  Key Review Findings 
11.1 This review considered the strength of the Perth and Kinross business base,
the effectiveness of the wider business support ecosystem, the contribution of
Council-led interventions, the performance of funded business support
services and the future needs of businesses across Perth and Kinross. The
evidence has been assessed against the review framework and provides a
clear basis for determining the preferred future delivery model for Business
Gateway. 
11.2 Key Review Findings 
Review Theme Key Findings Implications for Future
Business Support
Business Base
Perth and Kinross has a strong,
diverse and resilient business base
with above-average business survival
rates and significant growth potential.
Continue supporting
entrepreneurship,
productivity, innovation and
business growth.
Business
Support
Ecosystem
Businesses benefit from a
comprehensive business support
ecosystem delivered through Perth and
Kinross Council, Business Gateway,
GrowBiz and national partners.
Maintain the existing
ecosystem whilst
strengthening collaboration
and coordination.
Business
Performance
Benchmarking and performance
information demonstrate positive
outcomes and compare favourably with
similar local authority areas.
Build on existing strengths
rather than fundamentally
restructuring current
arrangements.
Business
Survey
Businesses value personalised support
but identified opportunities to improve
awareness and navigation of services.
Improve customer journeys,
communications and referral
pathways.
Council-led
Support
The Council plays a key leadership,
coordination and investment role within
the business support ecosystem.
Continue strengthening
partnership working and
place-based economic
development.
Funded
Business
Support
Business Gateway and GrowBiz
provide complementary services and
are delivering positive outcomes for
businesses.
Strengthen integration and
local delivery priorities whilst
retaining the strengths of the
current model. 
11.3 Overall, the review found that Perth and Kinross benefits from a strong and
resilient business base. No significant structural gaps or unnecessary
duplication of services were identified. Instead, the principal opportunities for
improvement relate to strengthening collaboration between delivery partners,
improving awareness of available support, enhancing referral pathways and
increasing targeted support for entrepreneurship, inclusive enterprise and
businesses with high growth potential. 
11.4 Importantly, the review found no evidence that fundamental restructuring of
the business support ecosystem or withdrawal from the existing regional
Business Gateway delivery model would improve business outcomes,
represent better value for money or strengthen the overall effectiveness of
Page 34 of 254

Page 35

business support provision. Instead, the evidence supports building on the
strengths of the current arrangements through enhanced local delivery
priorities, stronger partnership working and continued regional collaboration. 
11.5 These findings informed the assessment of future Business Gateway delivery
options set out in Section 12. The options appraisal considered which delivery
model is best placed to build upon the strengths identified through the review,
address the opportunities for improvement and deliver the greatest long-term
benefit for businesses and the wider Perth and Kinross economy. 
12. Future delivery of Business Gateway 
Option Appraisal 
12.1 As requested by Committee, the review considered a range of options for the
future delivery of Business Gateway services. In doing so, the appraisal
considered not only the performance of Business Gateway itself, but also the
findings of the wider Business Support Review, including the strength of the
Perth and Kinross business base, the effectiveness of the wider business
support ecosystem, the activities delivered by GrowBiz and other delivery
partners, future opportunities arising through the Tay Cities Region Local
Growth Fund, and the Council's ambitions for entrepreneurship, Community
Wealth Building and inclusive economic growth. 
12.2 The review concluded that Perth and Kinross benefits from a strong and well-
established business support ecosystem. Businesses have access to support
throughout the business lifecycle and existing arrangements are delivering
positive outcomes in relation to business start-up, business survival, business
growth and business engagement. The review found no evidence that
fundamental restructuring of business support arrangements is required.
Instead, the greatest opportunities for improvement lie in strengthening
integration, partnership working, entrepreneurship, inclusive enterprise
activity, referral pathways and support for businesses with growth potential. 
12.3 Four delivery options were therefore assessed against the following criteria: 
• Strategic Fit and Alignment with Economic Priorities;
• Business Performance and Outcomes;
• Value for Money;
• Entrepreneurship, Inclusive Growth and Community Wealth Building; and
• Partnership Working, Deliverability and Future Flexibility. 
12.4 A detailed appraisal is provided in Appendix 3. The overall assessment is
summarised below. 
Option Summary Overall Assessment
Option 1 Continue regional model Strong performing option but
limited additionality
Option 2 Procure dedicated Perth
and Kinross service
Greater flexibility but increased
cost and risk
Page 35 of 254

Page 36

Option 3 Bring service in-house Maximum control but highest
implementation risk
Option 4 Retain regional model with
enhanced local priorities
Preferred option - strongest
overall balance of
performance, value for money
and strategic fit 
Preferred Option 
12.5 The review concludes that Option 4 – Continuation of Business Gateway
delivery model with enhanced local delivery priorities is the preferred option
for the future delivery of Business Gateway services. 
12.6 Under this option, Perth and Kinross Council would continue to participate in
the existing regional Business Gateway delivery model whilst strengthening
local delivery priorities through greater integration of specialist business
support activity currently delivered by GrowBiz and other delivery partners.
Business Gateway would continue to provide the core universal business
support offer, including business start-up support, growth advice, workshops,
digital support and access to national Business Gateway services. 
12.7 Local investment and partnership activity would increasingly focus on areas
identified through the review as providing the greatest additionality and
strategic value, including: 
• entrepreneurship and business creation;
• youth entrepreneurship;
• rural enterprise;
• women's enterprise;
• social enterprise and community enterprise;
• inclusive enterprise and self-employment;
• mentoring and peer support;
• Community Wealth Building outcomes;
• place-based enterprise activity;
• support for businesses with high growth potential; and
• strengthened referral pathways across the business support ecosystem. 
Why Option 4 is Preferred 
12.8 Option 4 achieved the highest overall appraisal score because it best reflects
the findings of the Business Support Review. It retains the strengths of the
existing regional Business Gateway model whilst directly responding to the
opportunities identified through the review, particularly around
entrepreneurship, inclusive enterprise, Community Wealth Building,
partnership working and targeted local investment. 
12.9 The option: 
• retains a high-performing Business Gateway service that is delivering
positive outcomes for businesses across Perth and Kinross;
• builds upon established regional partnerships and economies of scale; 
• recognises and strengthens the activities currently delivered by GrowBiz
within the wider business support ecosystem; 
Page 36 of 254

Page 37

• aligns strongly with the Perth and Kinross Economic Action Plan, Tay Cities
Regional Economic Strategy and Community Wealth Building ambitions; 
• supports inclusive economic growth and anti-poverty objectives through
increased focus on entrepreneurship and inclusive enterprise; 
• provides flexibility to respond to emerging business needs and
opportunities arising through the Tay Cities Region Local Growth Fund; and 
• avoids the cost, complexity and implementation risks associated with
procuring a separate service or bringing delivery in-house. 
12.10  Whilst Option 1 performs strongly and would be a credible option, Option 4
was preferred as it provides a mechanism to address the principal
opportunities identified by the review, particularly around entrepreneurship,
inclusive enterprise, Community Wealth Building and support for growth
businesses. 
Financial and Risk Implications 
12.11 The preferred option can be delivered within existing approved budgets and
does not require the procurement of a new service or the establishment of an
in-house delivery model. It therefore avoids the mobilisation, staffing,
governance and transition costs associated with alternative options.
Enhanced activity will be achieved primarily through refocusing existing
resources, strengthening integration and collaboration between delivery
partners and maximising external funding opportunities, including the Tay
Cities Region Local Growth Fund. 
12.12 The primary objective is improved outcomes and targeting rather than budget
savings, although future commissioning discussions could identify efficiencies
or opportunities to redirect investment toward local priorities including
GrowBiz current funding allocations into the Business Gateway regional
delivery model. 
12.13 The principal risks relate to ensuring effective collaboration between delivery
partners and maintaining alignment between regional Business Gateway
arrangements and local priorities. These risks are considered low to medium
and can be mitigated through existing governance arrangements, regular
performance monitoring, strengthened referral pathways and continued
partnership working between Perth and Kinross Council, Business Gateway
and other partners. 
Conclusion 
12.14 Having considered the evidence gathered through the Business Support
Review, the performance of existing services, benchmarking information,
business engagement activity and future economic development
opportunities, officers conclude that retaining the regional Business Gateway
model while enhancing local partnership delivery represents the most
effective and proportionate approach. 
12.15 The preferred option retains the strengths and value for money of the existing
model whilst providing greater focus on entrepreneurship, inclusive enterprise,
Community Wealth Building and support for growth businesses. It therefore
Page 37 of 254

Page 38

offers the strongest overall fit with the Council's economic development
priorities and the future needs of businesses across Perth and Kinross. 
13. Future Focus 
13.1 The review has identified a strong and well-established business support
ecosystem across Perth and Kinross, with a broad range of services available
to businesses at different stages of development. Opportunities for
improvement relate primarily to enhancing coordination, visibility and
navigation of existing support rather than introducing significant structural
change. 
13.2 On this basis, the preferred approach is to build on existing strengths by
strengthening collaboration between partners, improving referral pathways
and ensuring businesses can access the right support at the right time. 
13.3 The key priorities for future business support activity are: 
• increasing entrepreneurship, self-employment and business creation,
particularly amongst young people, women, rural communities and under-
represented groups;
• strengthening support for businesses with high growth potential, including
those seeking to improve productivity, innovate, access new markets and
scale up;
• enhancing inclusive enterprise activity and maximising the contribution
business support can make to tackling poverty and promoting inclusive
economic growth;
• supporting the delivery of Community Wealth Building objectives through
place-based approach, local enterprise development, supply chain growth
and local wealth retention;
• improving awareness of available support and creating clearer customer
journeys across the business support ecosystem;
• strengthening referral pathways and collaboration between Business
Gateway, Perth and Kinross Council, national agencies and wider
partners;
• maximising opportunities arising from the Tay Cities Region Local Growth
Fund and other regional and national investment programmes;
• continuing to develop business intelligence and proactive engagement to
better understand emerging business needs and opportunities; and
• ensuring support remains responsive to changing economic conditions,
technological change, workforce challenges and the transition to net zero. 
13.4 The preferred option identified through the Business Gateway appraisal
provides a strong foundation for delivering these priorities. By retaining the
existing regional Business Gateway model whilst enhancing local partnership
activity and targeted interventions, Perth and Kinross will be well placed to
support entrepreneurship, business growth, innovation, investment and
inclusive economic growth over the coming years. 
13.5 These priorities will inform future discussions with current Business Gateway
operator, GrowBiz and other partners and will be reflected in future service
planning, commissioning arrangements and performance monitoring. These
Page 38 of 254

Page 39

discussions would take place throughout 2026/2027 and 2027/2028.
Particular emphasis will be placed on ensuring that local investment is
targeted towards areas where it can deliver the greatest additionality and
contribute most effectively to the ambitions of the Perth and Kinross Economic
Action Plan and wider Council priorities. 
13.6 The following table provides a high-level mapping of key priorities for future
business support activity and partners: 
Opportunity Area Organisation Future Focus
Business start-up
and early growth
Rural businesses/
inclusive
Business Gateway
Operator(s)
Increase entrepreneurship
activity at idea and early
start-ups stages,
strengthen rural delivery
and inclusive enterprise,
start-ups and early growth
stages with targeted
place-based approach
Scale-up / High-
growth businesses
Business Gateway
Operator(s) / PKC /
Scottish Enterprise
Greater focus on account
management and scale-up
support
Skills Skills Development
Scotland / UHI Perth/PKC
Strengthen employer
engagement
Innovation
Scottish Enterprise /
Universities / Research
institutions (eg James
Hutton Institute)
Increase awareness and
referrals
Finance
PKC Grants / Angel’s
Share / Public and
Private finance
Improve investment
readiness and private
investment
Property
PKC (Commercial
Property Investment
Programme) / Private
sector
Continue delivery of
employment land and
business units
Net Zero Clean Growth Axis (PKC
and partners)
Increase business
engagement and private
investment
Export Scottish Development
International Increase targeted export
Community Wealth
Building PKC / anchor employers
Generate wider economic
and social value through
local procurement,
workforce development,
community wealth building
approaches and
investment in local supply
chains. 
Page 39 of 254

Page 40

14.  Conclusion 
14.1 Perth and Kinross benefits from a strong, diverse and resilient business base
supported by a comprehensive business support ecosystem delivered through
Perth and Kinross Council, Business Gateway, GrowBiz and a range of
regional and national partners. Collectively, these organisations provide
support throughout the business lifecycle and make an important contribution
to entrepreneurship, business growth, innovation, investment and
employment. 
14.2 The review demonstrates that existing business support arrangements are
performing well. Benchmarking data, business engagement, survey feedback
and service performance information indicate that businesses value the
breadth of support available and that Perth and Kinross compares favourably
with similar local authority areas across a range of measures including
business start-up activity, business survival and business growth potential. 
14.3 The review found no evidence that fundamental restructuring of the business
support ecosystem is required. Instead, the evidence supports a continued
focus on strengthening integration, partnership working, improving awareness
of existing support, enhancing referral pathways, increasing support for
entrepreneurship and inclusive enterprise activity, and targeting interventions
towards businesses and sectors with the greatest growth potential. 
14.4 Having considered the available evidence and the options appraisal, the
review concludes that Option 4 – Continuation of Business Gateway Regional
Delivery Model with enhanced local delivery priorities represents the most
effective future delivery arrangement for Business Gateway services. This
option retains the strengths and value for money of the existing regional
Business Gateway model whilst providing greater focus on entrepreneurship,
inclusive enterprise, Community Wealth Building, support for high-growth
businesses and stronger partnership working across the wider business
support ecosystem. The preferred option builds upon, rather than replaces,
existing arrangements. 
14.5 Accordingly, the report recommends that Perth and Kinross Council continues
to participate in the regional Business Gateway delivery model whilst seeking
greater integration of activities delivered by GrowBiz and other partners into
the regional Business Gateway delivery model to sustain and improve
business support ecosystem and deliver a coordinated programme of
interventions that supports businesses at every stage of their journey and
contributes to sustainable and inclusive economic growth across Perth and
Kinross. 
15. Impact and Value Assessment 
15.1 Link to IVA - Business_Support_Review.pdf 
16. Appendices 
16.1 Appendix 1 - Business Support Landscape 
Page 40 of 254

Page 41

16.2 Appendix 2 - Business Support Survey 
16.3 Appendix 3 - Option Appraisal - Future Delivery of Business Gateway 
Page 41 of 254

Page 42

Page 42 of 254

Page 43

Appendix 1
The Business Support Landscape 
The Business Support Review found that Perth and Kinross benefits from a
comprehensive business support ecosystem, delivered through strong partnership
working between Perth and Kinross Council, funded providers and national
agencies.
The typical business lifecycle stages are illustrated below: 
Examples of typical support interventions at each stage are provided below:
Stage Typical Support
Idea Schools, entrepreneurship, enterprise education
Start-Up 1to1 sessions, baseline templates, peer support, grants,
premises
Early Growth Advice, mentoring, digital adoption, export readiness
Scale-Up Investment, exporting, property expansion
Mature Innovation, recruitment, skills
Anchor Business Supply chains, community wealth building
Innovation/
Succession Renewal Succession, decarbonisation, diversification 
6
Page 43 of 254

Page 44

Perth and Kinross businesses access support from a range of organisations at
various stages of their lifecycle. Collectively these organisations provide access to:
• Advice
• Business accelerators
• Equity-raising support
• Funding
• Innovation support
• Investor-related support 
• Inward investment services 
• Mentoring
• Networking opportunities
• Sector-specific expertise
• Skills support
• Specialist interventions
Business support is currently delivered through:
Organisation Primary Focus
Perth and Kinross Council
(direct delivery)
Business engagement, investment, grants,
planning, licensing, commercial property,
business intelligence and economic
development, equity-raising support
(programme)
Business Gateway
(funded services via
procurement)
Start-up support, business growth advice,
workshops, one-to-one support, specialist
advice, rural business support via Outreach
Advisers
Elevator UK
(funded services via
procurement)
Business accelerators 
GrowBiz
(funded services via
agreement)
Rural businesses, micro businesses, mentoring,
peer support, young entrepreneurs, and
administration of two sectoral groups
Scottish Enterprise Innovation, productivity, internationalisation and
high-growth businesses
Scottish Development
International Exporting and inward investment
Page 44 of 254

Page 45

Skills Development Scotland Workforce development and skills
VisitScotland Tourism business support
Supplier Development
Programme
(funded services via
Partnership between Local
authorities and Scottish
Government)
Public sector procurement support
Chamber of Commerce, FSB
and other partners Networking, representation and specialist advice 
The diagram below provides an illustration of business support ecosystem in Perth
and Kinross: 
Page 45 of 254

Page 46

Whilst the breadth of support available across Perth and Kinross is significant, the
review found that businesses often engage with multiple organisations as they grow
and develop. Whilst support organisations generally work well together, evidence
gathered through the business survey, partner engagement and ecosystem mapping
suggests that businesses can sometimes find the overall landscape difficult to
navigate.
This does not reflect a lack of provision. Rather, it highlights the importance of
effective signposting, strong referral pathways and coordinated communication
between providers to ensure businesses can access the right support at the right
time. 
Page 46 of 254

Page 47

Page 1
Business Support in Perth and Kinross: Summary report
This report was created on Monday 29 June 2026 at 08:09 and includes 25 responses.
The activity ran from 18/05/2026 to 26/06/2026.
Contents
What is the size of your business? 3
Size of business 3
Please confirm the postcode of your main business premises. 3
Postcode 3
Select your business sector 4
Business sector 4
If you selected "other", please confirm your business sector 5
Business sector 5
How long have you been actively trading? 5
Time trading 5
What type of business support do you want or need? 5
What type of business support do you want or need? 5
Have you accessed any business support in the last 12 months? (April 2025 to March 2026) For example, Business Gateway,
GrowBiz, Perth & Kinross Council, Scottish Enterprise, Skills Development Scotland, Chamber of Commerce etc.
6
Have accessed business support 6
Which organisations have you accessed support from in the last 12 months? 6
Which organisations have you accessed support from in the last 12 months? 6
If you answered 'Other' please provide more details below. 7
Other - Which organisations 7
What type of support did you receive? 7
What type of support did you receive? 7
If you answered 'Other' please provide more details below. 8
Other - What type of support did you receive? 8
How did you hear about the support you accessed? 8
How did you hear about the support 8
If you answered 'Other' please provide more details below. 8
Other - How did you hear about the support 8
How easy was it to access support overall? 9
How easy was it to access support overall? 9
Did your location make accessing support more difficult? 9
Did your location make accessing support more difficult? 9
If you answered 'Yes' please provide more details below. 9
Location access difficulty 9
Overall, how satisfied were you with the business support received? 10
Overall satisfaction with the support received 10
Would you like to expand on your response? 10
Additional response on overall satisfaction 10
Which areas of your business did the support you receive impact positively on? 10
Impact of support received 10
Overall, what was the impact on your business from the business support received? 11
Overall impact on business 11
Do you wish to add anything additional to your response? We welcome all feedback. 11
Do you wish to add anything further to your satisfaction or impact levels of the business support received? 11
How well did the support meet the needs of your business? 11
How well did the support meet the needs of your business? 11
If you have any comments about how well the support met your needs, please leave them below. 12
comments about how well the support met your needs, 12
Overall, how satisfied were you with the support received? 12
how satisfied were you with the support received 12
Which areas of your business did the support positively impact? 13
Which areas of your business did the support positively impact 13
6
Page 47 of 254

Page 48

Page 2
If you answered 'Other' please provide more details below. 13
Other - Which areas of your business did the support positively impact 13
What was the overall impact of the support? 14
What was the overall impact of the support? 14
What types of support would be most valuable to your business over the next 12 to 24 months? 15
What types of support would be most valuable to your business over the next 12 to 24 months? 15
If you answered 'Other' please provide more details below. 16
Other - What types of support would be most valuable to your business over the next 12 to 24 months? 16
How would you prefer to access business support? 16
How would you prefer to access business support? 16
If you answered 'Other' please provide more details below. 17
Pther - How would you prefer to access business support? 17
How clear is the current business support landscape overall? 17
How clear is the current business support landscape overall? 17
Would you use business support services again in future? 17
Would you use business support services again in future? 17
If you have any comments please provide more details below. 18
Other - looking ahead 18
Have you accessed support from Business Gateway in the last 12 months? 18
Have you accessed support from Business Gateway in the last 12 months? 18
How valuable was the support provided by Business Gateway? 18
How valuable was the support provided by Business Gateway? 18
If you have any comments about the support provided by Business Gateway you can leave them below. 18
If you have any comments about the support provided by Business Gateway you can leave them below. 18
Have you accessed support from GrowBiz in the last 12 months? 19
Have you accessed support from Growbiz in the last 12 months? 19
How valuable was the support provided by Growbiz? 19
How valuable was the support provided by Business Gateway? 19
If you have any comments about the support provided by Growbiz you can leave them below. 19
If you have any comments about the support provided by Business Gateway you can leave them below. 19
Did your business need support during this period? 19
Did your business need support during this period? 19
What were the main reasons you did not access support? 20
What were the main reasons you did not access support? 20
If you answered 'Other' please provide more details below. 21
No support - other 21
What type of support would have been most useful to your business? 22
What type of support would have been most useful to your business? 22
If you answered 'Other' please provide more details below. 23
Other - What type of support would have been most useful to your business? 23
Would you like to provide any additional comments? 23
Would you like to provide any additional comments? 23
If you have not accessed business support, or were unable to access it, what were the main reasons? 24
Why they didn't access business support 24
Would you like to add any additional information? 24
Would you like to add any additional information? 24
Would you like to sign-up to our mailing list? If so, please leave your details below. 25
Company name 25
Email address 25
Page 48 of 254

Page 49

Page 3
What is the size of your business?
Size of business
Micro (0 to 9 employees)
Small (10 to 49 employees)
Medium (50 to 249 employees)
Large (250+ employees)
Not Answered
0 21
Option Total Percent
Micro (0 to 9 employees) 21 84.00%
Small (10 to 49 employees) 2 8.00%
Medium (50 to 249 employees) 2 8.00%
Large (250+ employees) 0 0.00%
Not Answered 0 0.00%
Please confirm the postcode of your main business premises.
Postcode
There were 25 responses to this part of the question.
Page 49 of 254

Page 50

Page 4
Select your business sector
Business sector
Electricity, gas, renewable energy
and air conditioning supply
Real estate
Wholesale and/or retail trade
(including repair of motor vehicles)
Human health and social work
Construction
Manufacturing including food
Public administration and/or
defence including social security
Administrative and support
services
Education
Agriculture, forestry and fishing
Water supply, sewerage and
waste management
Tourism accommodation and food
service activities
Financial and insurance activities
Professional, scientific and
technical activities
Transportation and storage
Recreation, entertainment, culture
and the arts
Information and communication
Mining and quarrying
Other
Not Answered
0 6
Page 50 of 254

Page 51

Page 5
Option Total Percent
Electricity, gas, renewable energy and air conditioning supply 0 0.00%
Real estate 0 0.00%
Wholesale and/or retail trade (including repair of motor vehicles) 4 16.00%
Human health and social work 3 12.00%
Construction 0 0.00%
Manufacturing including food 1 4.00%
Public administration and/or defence including social security 0 0.00%
Administrative and support services 1 4.00%
Education 0 0.00%
Agriculture, forestry and fishing 1 4.00%
Water supply, sewerage and waste management 0 0.00%
Tourism accommodation and food service activities 5 20.00%
Financial and insurance activities 2 8.00%
Professional, scientific and technical activities 2 8.00%
Transportation and storage 0 0.00%
Recreation, entertainment, culture and the arts 0 0.00%
Information and communication 0 0.00%
Mining and quarrying 0 0.00%
Other 6 24.00%
Not Answered 0 0.00%
If you selected "other", please confirm your business sector
Business sector
There were 6 responses to this part of the question.
How long have you been actively trading?
Time trading
Under 1 year
1 to 3 years
4 to 10 years
10 years and over
Not Answered
0 10
Option Total Percent
Under 1 year 1 4.00%
1 to 3 years 5 20.00%
4 to 10 years 10 40.00%
10 years and over 9 36.00%
Not Answered 0 0.00%
What type of business support do you want or need?
What type of business support do you want or need?
There were 25 responses to this part of the question.
Page 51 of 254

Page 52

Page 6
Have you accessed any business support in the last 12 months? (April 2025 to March 2026) For example,
Business Gateway, GrowBiz, Perth & Kinross Council, Scottish Enterprise, Skills Development Scotland, Chamber
of Commerce etc.
Have accessed business support
Yes
No
Not Answered
0 16
Option Total Percent
Yes 16 64.00%
No 9 36.00%
Not Answered 0 0.00%
Which organisations have you accessed support from in the last 12 months?
Which organisations have you accessed support from in the last 12 months?
Business Gateway
GrowBiz
Perth & Kinross Council –
Business Growth Team
Perth & Kinross Council – Skills &
Employability Team
Developing the Young Workforce
Tay Cities
Federation of Small Businesses
Perthshire Chamber of Commerce
Supplier Development Programme
Scottish Enterprise
Skills Development Scotland
VisitScotland
Other
Not Answered 
0 10
Page 52 of 254

Page 53

Page 7
Option Total Percent
Business Gateway 8 32.00%
GrowBiz 10 40.00%
Perth & Kinross Council – Business Growth Team 0 0.00%
Perth & Kinross Council – Skills & Employability Team 1 4.00%
Developing the Young Workforce Tay Cities 0 0.00%
Federation of Small Businesses 2 8.00%
Perthshire Chamber of Commerce 0 0.00%
Supplier Development Programme 1 4.00%
Scottish Enterprise 0 0.00%
Skills Development Scotland 0 0.00%
VisitScotland 0 0.00%
Other 1 4.00%
Not Answered 9 36.00%
If you answered 'Other' please provide more details below.
Other - Which organisations
There was 1 response to this part of the question.
What type of support did you receive?
What type of support did you receive?
Start-up support
Business growth support
Specialist/expert advice
Mentoring/coaching
Workshops/training
Networking/events
Digital support
Funding advice
Accelerator programme
Procurement/tendering support
Skills/workforce support
Other
Not Answered 
0 9
Page 53 of 254

Page 54

Page 8
Option Total Percent
Start-up support 2 8.00%
Business growth support 6 24.00%
Specialist/expert advice 4 16.00%
Mentoring/coaching 2 8.00%
Workshops/training 9 36.00%
Networking/events 7 28.00%
Digital support 2 8.00%
Funding advice 3 12.00%
Accelerator programme 0 0.00%
Procurement/tendering support 0 0.00%
Skills/workforce support 2 8.00%
Other 3 12.00%
Not Answered 9 36.00%
If you answered 'Other' please provide more details below.
Other - What type of support did you receive?
There were 3 responses to this part of the question.
How did you hear about the support you accessed?
How did you hear about the support
Online / social media
Word of mouth
Event or workshop
Through another organisation
Existing relationship/contact
Other
Not Answered 
0 9
Option Total Percent
Online / social media 5 20.00%
Word of mouth 4 16.00%
Event or workshop 2 8.00%
Through another organisation 0 0.00%
Existing relationship/contact 8 32.00%
Other 1 4.00%
Not Answered 9 36.00%
If you answered 'Other' please provide more details below.
Other - How did you hear about the support
There was 1 response to this part of the question.
Page 54 of 254

Page 55

Page 9
How easy was it to access support overall?
How easy was it to access support overall?
Very easy
Easy
Neither easy nor difficult
Difficult
Very difficult
Not Answered 
0 9
Option Total Percent
Very easy 9 36.00%
Easy 2 8.00%
Neither easy nor difficult 2 8.00%
Difficult 1 4.00%
Very difficult 2 8.00%
Not Answered 9 36.00%
Did your location make accessing support more difficult?
Did your location make accessing support more difficult?
Yes
No
Not Answered 
0 15
Option Total Percent
Yes 1 4.00%
No 15 60.00%
Not Answered 9 36.00%
If you answered 'Yes' please provide more details below.
Location access difficulty
There was 1 response to this part of the question.
Page 55 of 254

Page 56

Page 10
Overall, how satisfied were you with the business support received?
Overall satisfaction with the support received
Very satisfied
Satisfied
Neither satisfied or unsatisfied
Unsatisfied
Very unsatisfied
Not Answered 
0 9
Option Total Percent
Very satisfied 9 36.00%
Satisfied 2 8.00%
Neither satisfied or unsatisfied 3 12.00%
Unsatisfied 0 0.00%
Very unsatisfied 2 8.00%
Not Answered 9 36.00%
Would you like to expand on your response?
Additional response on overall satisfaction
There were 8 responses to this part of the question.
Which areas of your business did the support you receive impact positively on?
Impact of support received
Improved finances
Access to new markets and
customers
Investment in equipment or
technology
Improved skills or confidence
Jobs created or sustained
No impact
Not Answered 
0 9
Page 56 of 254

Page 57

Page 11
Option Total Percent
Improved finances 2 8.00%
Access to new markets and customers 3 12.00%
Investment in equipment or technology 1 4.00%
Improved skills or confidence 9 36.00%
Jobs created or sustained 1 4.00%
No impact 4 16.00%
Not Answered 9 36.00%
Overall, what was the impact on your business from the business support received?
Overall impact on business
Major impact
Significant impact
Moderate impact
Minor impact
No impact
Not Answered 
0 9
Option Total Percent
Major impact 1 4.00%
Significant impact 3 12.00%
Moderate impact 5 20.00%
Minor impact 3 12.00%
No impact 4 16.00%
Not Answered 9 36.00%
Do you wish to add anything additional to your response? We welcome all feedback.
Do you wish to add anything further to your satisfaction or impact levels of the business support received?
There were 4 responses to this part of the question.
How well did the support meet the needs of your business?
How well did the support meet the needs of your business?
Fully met needs
Mostly met needs
Partly met needs
Met needs slightly
Did not meet needs at all
Not Answered 
0 9
Page 57 of 254

Page 58

Page 12
Option Total Percent
Fully met needs 6 24.00%
Mostly met needs 1 4.00%
Partly met needs 4 16.00%
Met needs slightly 3 12.00%
Did not meet needs at all 2 8.00%
Not Answered 9 36.00%
If you have any comments about how well the support met your needs, please leave them below.
comments about how well the support met your needs,
There were 4 responses to this part of the question.
Overall, how satisfied were you with the support received?
how satisfied were you with the support received
Very satisfied
Satisfied
Neither satisfied nor dissatisfied
Unsatisfied
Very unsatisfied
Not Answered 
0 9
Page 58 of 254

Page 59

Page 13
Option Total Percent
Very satisfied 7 28.00%
Satisfied 4 16.00%
Neither satisfied nor dissatisfied 3 12.00%
Unsatisfied 0 0.00%
Very unsatisfied 2 8.00%
Not Answered 9 36.00%
Which areas of your business did the support positively impact?
Which areas of your business did the support positively impact
Financial performance
Access to new markets/customers
Investment in equipment or
technology
Improved skills or confidence
Jobs created or sustained
Business resilience
Innovation/new products/services
No noticeable impact
Other
Not Answered 
0 9
Option Total Percent
Financial performance 2 8.00%
Access to new markets/customers 2 8.00%
Investment in equipment or technology 0 0.00%
Improved skills or confidence 6 24.00%
Jobs created or sustained 1 4.00%
Business resilience 2 8.00%
Innovation/new products/services 0 0.00%
No noticeable impact 5 20.00%
Other 2 8.00%
Not Answered 9 36.00%
If you answered 'Other' please provide more details below.
Other - Which areas of your business did the support positively impact
There were 2 responses to this part of the question.
Page 59 of 254

Page 60

Page 14
What was the overall impact of the support?
What was the overall impact of the support?
Major impact
Significant impact
Moderate impact
Minor impact
No impact
Not Answered 
0 9
Page 60 of 254

Page 61

Page 15
Option Total Percent
Major impact 1 4.00%
Significant impact 3 12.00%
Moderate impact 6 24.00%
Minor impact 3 12.00%
No impact 3 12.00%
Not Answered 9 36.00%
What types of support would be most valuable to your business over the next 12 to 24 months?
What types of support would be most valuable to your business over the next 12 to 24 months?
Access to funding/grants
Recruiting staff
Workforce skills/training
Digital support
Marketing/social media
Exporting/international trade
Net Zero/sustainability
Premises/property support
Start-up support
Business growth/scaling
Innovation/product development
Tourism support
Networking opportunities
Procurement/tendering
Leadership/management
development
Financial/business planning
Mentoring/coaching
Peer support/networking
Other
Not Answered 
0 12
Page 61 of 254

Page 62

Page 16
Option Total Percent
Access to funding/grants 12 48.00%
Recruiting staff 1 4.00%
Workforce skills/training 2 8.00%
Digital support 5 20.00%
Marketing/social media 5 20.00%
Exporting/international trade 1 4.00%
Net Zero/sustainability 5 20.00%
Premises/property support 5 20.00%
Start-up support 1 4.00%
Business growth/scaling 9 36.00%
Innovation/product development 0 0.00%
Tourism support 0 0.00%
Networking opportunities 8 32.00%
Procurement/tendering 3 12.00%
Leadership/management development 4 16.00%
Financial/business planning 6 24.00%
Mentoring/coaching 5 20.00%
Peer support/networking 6 24.00%
Other 2 8.00%
Not Answered 9 36.00%
If you answered 'Other' please provide more details below.
Other - What types of support would be most valuable to your business over the next 12 to 24 months?
There were 2 responses to this part of the question.
How would you prefer to access business support?
How would you prefer to access business support?
In-person locally
Online
Hybrid mix of online and in-person
One-to-one adviser support
Workshops/events
Peer networking opportunities
No preference
Other
Not Answered 
0 11
Page 62 of 254

Page 63

Page 17
Option Total Percent
In-person locally 8 32.00%
Online 4 16.00%
Hybrid mix of online and in-person 11 44.00%
One-to-one adviser support 9 36.00%
Workshops/events 7 28.00%
Peer networking opportunities 7 28.00%
No preference 2 8.00%
Other 0 0.00%
Not Answered 9 36.00%
If you answered 'Other' please provide more details below.
Pther - How would you prefer to access business support?
There was 1 response to this part of the question.
How clear is the current business support landscape overall?
How clear is the current business support landscape overall?
Very clear
Mostly clear
Neither clear nor unclear
Confusing
Very confusing
Not Answered 
0 9
Option Total Percent
Very clear 1 4.00%
Mostly clear 6 24.00%
Neither clear nor unclear 3 12.00%
Confusing 5 20.00%
Very confusing 1 4.00%
Not Answered 9 36.00%
Would you use business support services again in future?
Would you use business support services again in future?
Yes
No
Unsure
Not Answered 
0 13
Page 63 of 254

Page 64

Page 18
Option Total Percent
Yes 13 52.00%
No 0 0.00%
Unsure 3 12.00%
Not Answered 9 36.00%
If you have any comments please provide more details below.
Other - looking ahead
There were 2 responses to this part of the question.
Have you accessed support from Business Gateway in the last 12 months?
Have you accessed support from Business Gateway in the last 12 months?
Yes
No
Not Answered 
0 9
Option Total Percent
Yes 7 28.00%
No 9 36.00%
Not Answered 9 36.00%
How valuable was the support provided by Business Gateway?
How valuable was the support provided by Business Gateway?
Very valuable
Valuable
Neutral
Limited value
No value
Not Answered 
0 18
Option Total Percent
Very valuable 1 4.00%
Valuable 3 12.00%
Neutral 2 8.00%
Limited value 0 0.00%
No value 1 4.00%
Not Answered 18 72.00%
If you have any comments about the support provided by Business Gateway you can leave them below.
If you have any comments about the support provided by Business Gateway you can leave them below.
There were 2 responses to this part of the question.
Page 64 of 254

Page 65

Page 19
Have you accessed support from GrowBiz in the last 12 months?
Have you accessed support from Growbiz in the last 12 months?
Yes
No
Not Answered 
0 10
Option Total Percent
Yes 10 40.00%
No 6 24.00%
Not Answered 9 36.00%
How valuable was the support provided by Growbiz?
How valuable was the support provided by Business Gateway?
Very valuable
Valuable
Neutral
Limited value
No value
Not Answered 
0 15
Option Total Percent
Very valuable 7 28.00%
Valuable 1 4.00%
Neutral 2 8.00%
Limited value 0 0.00%
No value 0 0.00%
Not Answered 15 60.00%
If you have any comments about the support provided by Growbiz you can leave them below.
If you have any comments about the support provided by Business Gateway you can leave them below.
There were 5 responses to this part of the question.
Did your business need support during this period?
Did your business need support during this period?
Yes
No
Unsure
Not Answered 
0 15
Page 65 of 254

Page 66

Page 20
Option Total Percent
Yes 8 32.00%
No 0 0.00%
Unsure 2 8.00%
Not Answered 15 60.00%
What were the main reasons you did not access support?
What were the main reasons you did not access support?
I was not aware of the support
available
I was unsure what support was
right for my business
I did not know how to access
support
The process felt too complicated
or time-consuming
I did not meet the eligibility criteria
Support was not available when I
needed it
The support did not feel relevant to
my business needs
I prefer to manage things
independently
I had a poor experience previously
My location made it difficult to
access support
Time pressures / too busy to
engage
Other
Not Answered 
0 17
Page 66 of 254

Page 67

Page 21
Option Total Percent
I was not aware of the support available 4 16.00%
I was unsure what support was right for my business 3 12.00%
I did not know how to access support 1 4.00%
The process felt too complicated or time-consuming 0 0.00%
I did not meet the eligibility criteria 0 0.00%
Support was not available when I needed it 1 4.00%
The support did not feel relevant to my business needs 0 0.00%
I prefer to manage things independently 0 0.00%
I had a poor experience previously 1 4.00%
My location made it difficult to access support 0 0.00%
Time pressures / too busy to engage 2 8.00%
Other 2 8.00%
Not Answered 17 68.00%
If you answered 'Other' please provide more details below.
No support - other
There were 2 responses to this part of the question.
Page 67 of 254

Page 68

Page 22
What type of support would have been most useful to your business?
What type of support would have been most useful to your business?
Access to funding/grants
Recruiting staff
Workforce skills/training
Digital support
Marketing/social media
Exporting/international trade
Net Zero/sustainability
Premises/property support
Start-up support
Business growth/scaling
Innovation/product development
Tourism support
Networking opportunities
Procurement/tendering
Leadership/management
development
Financial/business planning
Mentoring/coaching
Peer support/networking
Other
Not Answered 
0 16
Page 68 of 254

Page 69

Page 23
Option Total Percent
Access to funding/grants 6 24.00%
Recruiting staff 3 12.00%
Workforce skills/training 3 12.00%
Digital support 4 16.00%
Marketing/social media 5 20.00%
Exporting/international trade 0 0.00%
Net Zero/sustainability 1 4.00%
Premises/property support 2 8.00%
Start-up support 0 0.00%
Business growth/scaling 2 8.00%
Innovation/product development 0 0.00%
Tourism support 5 20.00%
Networking opportunities 1 4.00%
Procurement/tendering 0 0.00%
Leadership/management development 1 4.00%
Financial/business planning 2 8.00%
Mentoring/coaching 1 4.00%
Peer support/networking 1 4.00%
Other 0 0.00%
Not Answered 16 64.00%
If you answered 'Other' please provide more details below.
Other - What type of support would have been most useful to your business?
There were 0 responses to this part of the question.
Would you like to provide any additional comments?
Would you like to provide any additional comments?
There were 2 responses to this part of the question.
Page 69 of 254

Page 70

Page 24
If you have not accessed business support, or were unable to access it, what were the main reasons?
Why they didn't access business support
I was not aware of the support
available
I was unsure what support was
right for my business
I did not know how to access
support
The process felt too complicated
or time-consuming
I did not meet the eligibility criteria
Support was not available at the
time I needed it
The support did not feel relevant to
my business needs
I prefer to manage things
independently
I have had a poor experience
previously
My location made it difficult to
access support
Time pressures and too busy to
engage
Other
Not Answered 
0 16
Option Total Percent
I was not aware of the support available 3 12.00%
I was unsure what support was right for my business 2 8.00%
I did not know how to access support 2 8.00%
The process felt too complicated or time-consuming 1 4.00%
I did not meet the eligibility criteria 0 0.00%
Support was not available at the time I needed it 1 4.00%
The support did not feel relevant to my business needs 1 4.00%
I prefer to manage things independently 0 0.00%
I have had a poor experience previously 0 0.00%
My location made it difficult to access support 0 0.00%
Time pressures and too busy to engage 2 8.00%
Other 1 4.00%
Not Answered 16 64.00%
Would you like to add any additional information?
Would you like to add any additional information?
There were 3 responses to this part of the question.
Page 70 of 254

Page 71

Page 25
Would you like to sign-up to our mailing list? If so, please leave your details below.
Company name
There were 15 responses to this part of the question.
Email address
There were 15 responses to this part of the question.
Page 71 of 254

Page 72

Page 72 of 254

Page 73

Appendix 3
Option Appraisal - Future Delivery of Business Gateway
Background
The Business Support Review concluded that Perth and Kinross benefits from a
strong, diverse and resilient business base supported by a mature and effective
business support ecosystem. Businesses have access to support throughout the
business lifecycle through Perth and Kinross Council, Business Gateway, GrowBiz,
Scottish Enterprise, Skills Development Scotland and other regional and national
partners.
The review found that:
• Perth and Kinross performs strongly in relation to business start-up activity,
business survival and business growth potential.
• Businesses value the personalised support, partnership working and breadth of
support available. 
• Business Gateway and GrowBiz fulfil complementary roles within the wider
business support ecosystem.
• There is no evidence that fundamental restructuring of existing business support
arrangements is required.
• The greatest opportunities for improvement lie in strengthening entrepreneurship,
inclusive enterprise, support for businesses with growth potential, integration,
partnership working, referral pathways and Community Wealth Building outcomes.
The appraisal therefore focuses on identifying the delivery model that best builds
upon existing strengths whilst addressing the opportunities identified through the
review.
Critical Success Factors
The review identified five critical success factors against which future Business
Gateway arrangements should be assessed.
Criteria Weighting
Strategic Fit and Alignment with Economic Priorities 25%
Business Performance and Outcomes 25%
Value for Money 20%
Entrepreneurship, Inclusive Growth and Community
Wealth Building (CWB) 15%
Partnership Working, Deliverability and Future Flexibility 15%
Total 100% 
6
Page 73 of 254

Page 74

Scoring Methodology
Score Description
5 Excellent
4 Good
3 Adequate
2 Weak
1 Poor 
Option 1 – Continue Existing Regional Business Gateway Delivery Model
Description
Perth and Kinross Council would continue to participate in the existing regional
Business Gateway contract and associated governance arrangements.
Assessment
The review found that the current model is performing well and provides a strong
universal business support offer. Business Gateway supported more than 1,270
businesses and 285 business starts during 2025/26, with Perth and Kinross
accounting for almost 40% of all business starts across the Tay Cities Region.
The option offers continuity, established governance arrangements, economies of
scale and low implementation risk. However, it largely maintains the status quo and
does not fully address opportunities identified through the review to strengthen
entrepreneurship, inclusive enterprise, Community Wealth Building and place-based
delivery.
Scoring
Criteria Score Weighted
Score
Strategic Fit 4 1.00
Business Performance and Outcomes 5 1.25
Value for Money 5 1.00
Entrepreneurship, Inclusive Growth and
CWB 3 0.45
Partnership, Deliverability and
Flexibility 4 0.60
Total  4.30
Overall Assessment: Strong performing, low-risk option that maintains current
success but offers limited additionality.
Page 74 of 254

Page 75

Option 2 – Procure a Dedicated Perth and Kinross Business Gateway Service
Description
Perth and Kinross Council would withdraw from the regional arrangement and
undertake a procurement exercise to appoint a dedicated service provider solely for
Perth and Kinross.
Assessment
This option would provide greater local control over service delivery, specification
and priorities and could allow support to be tailored more closely to local
circumstances.
However, the review found no evidence that the existing regional model is
underperforming or that a dedicated local contract would deliver materially better
outcomes. The option would increase procurement and contract management costs,
reduce economies of scale and potentially weaken alignment with wider Tay Cities
initiatives and regional investment opportunities. 
Scoring
Criteria Score Weighted
Score
Strategic Fit 4 1.00
Business Performance and Outcomes 3 0.75
Value for Money 2 0.40
Entrepreneurship, Inclusive Growth and
CWB 4 0.60
Partnership, Deliverability and
Flexibility 2 0.30
Total  3.05 
Overall Assessment: Offers greater local flexibility but insufficient evidence of
additional benefits to justify increased cost and risk.
Option 3 – Bring Business Gateway In-House
Description
Perth and Kinross Council would become directly responsible for delivering Business
Gateway services.
Assessment
An in-house model would provide maximum control and enable closer integration
with wider Economic Development, Employability, Place and Investment functions.
However, implementation would require significant organisational change, including
staffing, governance, operational systems and potential TUPE considerations. The
Page 75 of 254

Page 76

review found no evidence that current arrangements are failing or that an in-house
service would generate materially better outcomes than the existing model.
The option would also introduce the highest implementation risk and divert officer
time and resources away from business support delivery and economic growth
activities.
Scoring
Criteria Score Weighted
Score
Strategic Fit 4 1.00
Business Performance and Outcomes 3 0.75
Value for Money 1 0.20
Entrepreneurship, Inclusive Growth and
CWB 4 0.60
Partnership, Deliverability and
Flexibility 1 0.15
Total  2.70
Overall Assessment: Provides maximum local control but represents the highest-
risk and least cost-effective option.
Option 4 – Continuation of the Business Gateway Delivery Model with
enhanced local delivery priorities (Preferred Option)
Description
Perth and Kinross Council would retain participation in the existing regional Business
Gateway model whilst enhancing local business support activity through greater
integration of the activities currently delivered by GrowBiz and other delivery partners
into the regional model.
Business Gateway would continue to provide the core universal offer, including start-
up support, business growth advice, workshops, digital support and access to
national Business Gateway services. Local investment and commissioning activity
would increasingly focus on areas identified through the review as providing greatest
additionality and strategic value.
Key Areas of Focus
• Entrepreneurship and business creation.
• Youth entrepreneurship.
• Rural enterprise.
• Women's enterprise.
• Social enterprise and community enterprise.
• Inclusive enterprise and self-employment.
Page 76 of 254

Page 77

• Mentoring and peer support.
• Community Wealth Building outcomes.
• Place-based enterprise activity.
• Businesses with high growth potential.
• Stronger referral pathways across the business support ecosystem.
• Alignment with Tay Cities Region Local Growth Fund opportunities.
Assessment
The review found that the principal opportunity for improvement lies not in
restructuring Business Gateway, but in strengthening integration and the wider
business support ecosystem and targeting local investment towards areas where it
can achieve the greatest economic and social impact.
This option recognises the complementary activities currently delivered by Business
Gateway and GrowBiz. Business Gateway provides a high-performing universal
business support service, whilst GrowBiz delivers specialist support focused on rural
businesses, micro-businesses, social enterprises, young entrepreneurs and
community enterprises. Together, these activities provide a broader and more
inclusive offer across the business support ecosystem. 
The option directly addresses the key findings of the review by:
• retaining a proven and cost-effective Business Gateway service;
• strengthening entrepreneurship and inclusive enterprise activity;
• supporting Community Wealth Building objectives;
• enhancing support for growth businesses and priority sectors;
• improving integration and partnership working and referral pathways;
• maximising future Local Growth Fund opportunities; and
• maintaining flexibility to respond to changing business needs.
Scoring
Criteria Score Weighted
Score
Strategic Fit 5 1.25
Business Performance and Outcomes 5 1.25
Value for Money 4 0.80
Entrepreneurship, Inclusive Growth and
CWB 5 0.75
Partnership, Deliverability and
Flexibility 5 0.75
Page 77 of 254

Page 78

Criteria Score Weighted
Score
Total  4.80 
Overall Assessment: Best reflects the findings of the Business Support Review
and provides the strongest balance of performance, value for money, integration,
partnership working, inclusivity, flexibility and strategic alignment. 
Options Summary
Option Total
Score
Option 4 – Continuation of Business Gateway Regional
Delivery Model with enhanced local delivery priorities 4.80
Option 1 – Continue Existing Regional Business Gateway
Delivery Model 4.30
Option 2 – Procure a Dedicated Perth and Kinross Business
Gateway Service 3.05
Option 3 – Bring Business Gateway In-House 2.70 
Preferred Option
The review concludes that Option 4 – Continuation of Business Gateway
Regional Delivery Model with enhanced local delivery priorities is the preferred
option.
This option retains the strengths, performance and value for money of the existing
Business Gateway model whilst directly responding to the key opportunities
identified through the review. It enables Perth and Kinross Council and its partners to
focus resources on entrepreneurship, inclusive enterprise, Community Wealth
Building, support for growth businesses and targeted local interventions, whilst
maintaining continuity, regional collaboration and low implementation risk. 
Accordingly, Option 4 is considered the option most likely to maximise economic and
social value for Perth and Kinross over the period of the next Business Gateway
contract. 
Option 4 is not risk-free and that its higher score reflects a judgement that the
benefits outweigh the risks. A high-level risk appraisal is provided below:  
Page 78 of 254

Page 79

Risks of Option 4 – Continuation of Business Gateway Regional Delivery
Model with enhanced local delivery priorities
Risk Potential Impact Mitigation
Dependence on
partner alignment
Success relies on effective
integration of activities currently
delivered by Growbiz and other
partners into the Business
Gateway regional delivery model. If
priorities diverge, benefits may not
be realised.
Formal review of partnership
arrangements, revised
specifications, regular
performance reviews and
agreed outcomes.
Limited influence
over core
Business Gateway
contract
The Council remains part of a
regional contract and cannot
unilaterally redesign all aspects of
the service.
Continue active engagement
through governance
arrangements, procurement
and specifications design and
contract management
processes.
Benefits may take
time to emerge
Improvements in entrepreneurship,
inclusive enterprise and community
wealth building may take longer to
measure than traditional Business
Gateway outputs.
Develop clear performance
indicators and annual review
arrangements.
Potential overlap
between providers
Increased partnership working
could create duplication or
confusion if roles are not clearly
defined.
Strengthen specifications,
referral pathways, customer
journeys and responsibilities
across partners.
Funding
uncertainty
Elements of enhanced activity may
rely on future Local Growth Fund
or Council’s funding or other
external funding opportunities.
Prioritise activities within
existing budgets and leverage
external funding where
available.
Reputational risk
If enhanced partnership working
does not deliver additional
outcomes.
Robust monitoring and
reporting against agreed
outcomes. 
Overall Risk Assessment
Low to Medium Risk
The option retains an existing high-performing service and therefore avoids the
significant implementation risks associated with Options 2 and 3. Most risks relate to
achieving the additional benefits of enhanced integration and collaboration rather
than maintaining existing service performance. 
Page 79 of 254

Page 80

Page 80 of 254

Page 81

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure Committee 
Date of Meeting: 26 August 2026 
Report Title: Perth and Kinross Economic Action Plan (2025-2030)
Annual Progress Report 
Report Number: 26/221 
Report Author: Kirsty Easton, Business Growth Team Leader 
Organisational Lead: Serge Merone, Strategic Lead – Economy
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to provide the first annual progress update on
the delivery of the Perth and Kinross Economic Action Plan (2025–2030),
including progress against the agreed actions, the work of the Perth and
Kinross Economic Partnership and the governance arrangements established
to oversee delivery. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Partnership Delivery
6. Communications and Engagement
7. Business Champions
8. Data Working Group
9. Collaborative Investment
10. Economic Summit
11.  Review of the Action Plan
12. Conclusion
13. Impact and Value Assessment
14. Appendices 
7
Page 81 of 254

Page 82

2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the good progress made during the first year of delivery of the Perth
and Kinross Economic Action Plan (2025–2030); 
2.2 Notes the Action Plan progress update attached as Appendix 1, including
progress against individual actions; 
2.3 Notes the continued work of the Perth and Kinross Economic Partnership in
coordinating delivery of the Action Plan and strengthening collaborative
working across partner organisations; and 
2.4 Asks that further annual progress reports continue to be presented to
Economy and Infrastructure Committee. 
3. Background/Context 
3.1  In February 2025, the Economy and Infrastructure Committee endorsed the
draft Perth and Kinross Economic Action Plan (2025–2030) and agreed that it
should proceed to public consultation before being finalised by the Perth and
Kinross Economic Partnership. The Action plan was finalised by the
Partnership in May 2025 when it was formally published. 
3.2 The Action Plan provides a shared framework for economic development
activity across Perth and Kinross linking to the Tay Cities Regional Economic
Strategy and Prospectus for Regional Growth (2025-2035). It focuses on
growing a stronger, greener and fairer economy through collaborative action
by public, private, education and third sector partners. 
3.3 Delivery of the Action Plan commenced during 2025 and is led by Perth and
Kinross Economic Partnership. The Partnership provides strategic oversight,
challenge and coordination of delivery across partner organisations, ensuring
a collaborative approach to achieving shared economic priorities. This report
provides the first annual update on progress and demonstrates how the
Partnership has continued to strengthen collaborative working whilst
progressing delivery of the agreed actions. 
4. Main Issues 
4.1 Good progress has been made during the first year of delivery. A number of
actions have now been completed, with the majority of remaining actions
progressing as planned. Several longer-term projects continue to develop and
will require ongoing partnership working, external investment and project
development over the lifetime of the Action Plan. 
4.2 Progress against each action has been reviewed, and an updated Action Plan
is provided at Appendix 1. Actions have been assigned a Red, Amber or
Green (RAG) status to provide a clear indication of delivery progress. 
Page 82 of 254

Page 83

4.3 Several significant actions have already been completed during the first year,
whilst others have moved from planning into delivery. Examples include
continued progress on strategic investment projects, development of business
support initiatives, advancement of city centre regeneration activity and
implementation of actions supporting clean growth, tourism and inward
investment. 
4.4 The Partnership recognises that several actions represent long-term
transformational projects extending beyond a single reporting year. Progress
therefore continues to be monitored through quarterly Partnership meetings,
with delivery adapted where appropriate to reflect changing economic
conditions, emerging opportunities and available funding. 
5. Partnership Delivery 
Partnership Governance 
5.1 The Perth and Kinross Economic Partnership has continued to meet quarterly
throughout the year, providing strategic oversight of delivery of the Economic
Action Plan. 
5.2 Partnership meetings provide opportunities to: 
• monitor progress against agreed actions;
• consider emerging economic opportunities and challenges;
• align partner activity and resources;
• identify opportunities for collaborative working; and
• oversee delivery of shared economic development priorities. 
5.3 The Partnership continues to bring together representatives from the Council,
business support organisations, education providers, the private sector and
the third sector, ensuring a coordinated approach to economic development
across Perth and Kinross. 
5.4 The high participation rates in meetings, events and joint activities and the
good level of satisfaction amongst partners indicate efficient partnership
working and that the Partnership is developing as a strong and quality
partnership.   
6. Communications and Engagement 
6.1 Over the course of this first year the Partnership approved a Communications
and Engagement Plan to support delivery of the Economic Action Plan. The
Plan establishes a coordinated approach to promoting the Partnership’s
priorities, communicating progress, engaging businesses and communities
and strengthening awareness of economic opportunities across Perth and
Kinross. It also supports inward investment activity through consistent
messaging across partner organisations. 
Page 83 of 254

Page 84

6.2 Having a Communications and Engagement Plan in place supports the
development of a clear joint narrative to be used through established
communication channels.   
7. Business Champions 
7.1 The Partnership has also developed a Business Champions initiative to
strengthen engagement with the local business community and demonstrate
its customer-focused approach. 
7.2 The initiative brings together respected business leaders from across Perth
and Kinross to act as ambassadors for the region, promote the Economic
Action Plan, support inward investment activity and provide practical business
insight to help inform future priorities. 
7.3 Business Champions will also support delivery of engagement activity
including roundtable discussions, business events, place promotion and the
inaugural Perth and Kinross Economic Summit.   
8. Data Working Group 
8.1 Recognising the importance of evidence-led decision making, the Partnership
has established a joint Data Working Group with the Perth and Kinross Local
Employability Partnership. 
8.2 The purpose of the group is to improve the sharing and use of economic,
labour market and demographic intelligence across partner organisations. The
group will review existing data sources, identify opportunities to share
information appropriately, develop common indicators and strengthen the
evidence base used to inform investment decisions, policy development and
targeting of support. 
8.3 This collaborative approach will reduce duplication, improve understanding of
local economic challenges and support more informed decision making
across both partnerships. 
8.4 Although a Regional Intelligence Hub has not been established yet as stated
in the Plan, the Data Working Group is a robust starting point to contribute to
its development. 
9. Collaborative Investment 
9.1 The Partnership has continued to play an important role in overseeing
collaborative investment activity across Perth and Kinross. 
9.2 During delivery of the UK Shared Prosperity Fund programme, partners
collectively considered project proposals, agreed funding recommendations,
monitored delivery, reviewed project performance and considered the
reallocation of funding where appropriate. 
Page 84 of 254

Page 85

9.3 This collaborative governance approach has ensured that investment
decisions reflect the priorities of the Economic Action Plan whilst benefiting
from the expertise and challenge provided by a broad range of partners. 
9.4 The good and efficient delivery of the UK Shared Prosperity Fund Programme
has demonstrated an efficient sharing of financial resources.
9.5 Although there is a good commitment from Partners and sharing of specific
tasks and actions, more progress would need to be made in relation to
efficient sharing of staff and training. 
10. Economic Summit 
10.1 The Perth and Kinross Economic Partnership has also supported
development of the inaugural Perth and Kinross Economic Summit which will
take place on 9 September 2026. 
10.2 Partnership members have contributed to programme development, and will
assist through promotion of the event, facilitation of roundtable discussions,
participation in the Economic Village and wider stakeholder engagement. The
Summit will provide an opportunity to strengthen collaboration between
businesses, partners and communities whilst promoting the shared ambitions
of the Economic Action Plan. 
11.  Review of the Action Plan 
11.1 The Economic Action Plan is intended to be a live document that evolves in
response to changing economic circumstances and emerging opportunities. 
11.2 At its May 2026 meeting, the Partnership agreed to undertake a
comprehensive review of the Action Plan at its September 2026 meeting. This
review will consider progress during the first year of delivery, update
completed actions, review actions requiring amendment and identify any new
collaborative priorities. 
11.3 This approach ensures the Action Plan remains relevant, responsive and
focused on delivering the greatest impact for Perth and Kinross. 
12. Conclusion 
12.1 The first year of delivery demonstrates that good progress has been made in
implementing the Perth and Kinross Economic Action Plan. 
12.2 Alongside progressing individual actions, the Perth and Kinross Economic
Partnership has continued to strengthen collaborative working through robust
governance, coordinated communications, enhanced business engagement,
improved data sharing and joint investment decision making. 
12.3 While a number of longer-term actions remain in development, the
Partnership has established strong foundations for delivery and remains
committed to continually reviewing and refining the Action Plan to respond to
changing economic conditions and maximise opportunities for businesses,
communities and residents across Perth and Kinross. 
Page 85 of 254

Page 86

13. Impact and Value Assessment 
This is an operational report, and as such, no further assessment is required. 
14. Appendices 
14.1 Appendix 1 - PK Economic Action Plan Progress Update 
14.2 Appendix 2 - Communications and Engagement Plan 
Page 86 of 254

Page 87

GCPO Action What we're aiming for KPI Action Target/Milestones Timeline Lead Partner Other Partners Costs and funding sources RAG Links
EG, TC, JTNZ, CG Develop the first phase of Perth Eco-Innovation Park as a strategic site for energy and
mobility transition
Grow the supply chain, support
innovation and create a range of jobs and
career opportunities in the clean growth
sector.
Number of jobs created,
Hectares of employment land created
Phase 1 enabling infrastructure developed
Opportunities promoted
May-29 PKC Scottish Enterprise, Scottish
Development International
£33m - PKC has already
committed upto £3m to
support design phase –
existing budgets and external
funding Feb Paper update
Pre-construction works
underway. Planning and
Development work requiring
agreements with landowners
over Q3-4 2026 to enable the
next phase of the project
Feb 2026
update
paper
EG, TC, JTNZ, CG Develop Binn Eco-Park as a strategic site to support circular economy business
opportunities
Grow the supply chain, support
innovation and create a range of jobs and
career opportunities in the clean growth
sector.
Number of jobs created Master plan agreed 
Opportunities promoted
June 25 
Sept 25 (start)
Binn Group PKC,  Scottish Enterprise,
Scottish Development
International
£20K - Existing budgets and
external funding. 
£20K annually- Existing
budgets and external funding
Masterplan  developed and been
revised. Two circular economy
projects in pipeline coming
through Clean Growth Axis. A
plastic waste remediation
through fungus facility and an
insect protein farm. Discussions
early stage but have the
potential to greatly improve
Binn’s offering as a circular
economy centre
EG, TC, JTNZ, CG Position and market Perth and Kinross as a leader in energy and mobility transition and the
circular economy
Grow the supply chain, support
innovation and create a range of jobs and
career opportunities in the clean growth
sector.
Number of registered businesses in
energy sector
Level of investment attracted.
Economic Development marketing and communication Plan incl.
Invest in Perth website in place
May-25 PKC Scottish Enterprise/ Scottish
Development International
£20K annually - Existing
budgets and external funding
The launch of the Clean Growth
Axis (CGA)positions PKC as a
leader in the transition towards a
circular economy. The CGA
provides a project development
support platform that fosters the
development of circular
economy projects through
coordination of support from
across the public sector,
academia, and industry bodies.
An upcoming project to be taken
through the CGA is the Kinross
biochar plant. Currently in early
stages of project development
but this innovative project has
the potential to demonstrate the
synergies of energy production
utilising sustainable circular
materials as both an energy and
circular economy project
https://ww
w.investin
perth.co.u
k/the-
clean-
growth-
axis-perth-
and-
kinross
EG, TC, JTNZ, CG Develop a programme of investable energy transition projects with the private sector Grow the supply chain, support
innovation and create a range of jobs and
career opportunities in the clean growth
sector.
Private sector investment leverage.
Number of jobs created
Strategic Energy Partnership in place 
Agreed programme
Sept 25 
Dec 25
PKC Private partners £100K - Existing budgets and
external funding
TBC – Public and private
funding
Work on the Strategic Energy
Partnership is developing
investable shortlist bundles of
key energy projects across Perth
and Kinross. More scoping
development work and
consultancy support is needed
but work is progressing and
promises to present a series of
commercially attractive energy
transition propositions 
EG, TC, JTNZ, ToC Develop the Perth City Centre Development and Design Framework to create a series of
investable projects for street scape enhancements, property improvements and new
developments which can be taken forward and delivered.
Develop and deliver projects to
regenerate areas in and around the City
Centre which enhance the overall design
and economic performance of Perth.
Number of projects delivered.
Public and private sector funding
secured.
Approved Perth City Centre Development and Design Network. May 25 (Adoption of
Framework)
PKC Property owners and other
public and private sector
partners.
Staff time – Existing budgets
and external funding
Complete - the framework has
moved into action and delivery
phase.
Perth-City-
Centre-
Developm
ent-and-
Design-
Framewor
k.pdf
EG, TC, JTNZ, ToC Prepare for consultation with residents, businesses and tourism organisations on a local
visitor levy.
Increased levels of finance to re-invest in
projects and activities which enhance
the tourism offering in Perth & Kinross.
Number of visitors. 
Direct expenditure.
Total employment within the tourism
sector.
Consultation decision made March 25 (initial scoping
paper.
PKC Visit Scotland
Residents. 
Tourism organisations
Staff time – Existing budgets
and external funding Complete - early engagement
commenced summer 25 and
completed by end of the year.
Formal Engagement will
commence August 26
EG, TC, JTNZ, ToC Options appraisal and implementation of recommended approach to deliver strategic and co-
ordinated tourism destination marketing activity.
Drive up visitation and spend from
identified audiences, and establish a
joint public-private approach to tourism
destination marketing activity.
Number of visitors. 
Direct expenditure. 
Total employment within the tourism
sector.
Perth and Kinross Tourism Action Plan.
Options appraisal and recommended approach for destination
marketing action plan.
June 25
June 25
PKC VisitScotland.
Businesses operating within
the tourism sector.
Staff time – Existing budgets
and external funding
Review and relaunch of
PerthCityandTowns.co.uk
website and Continued close
working with VisitScotland on
destination marketing activity.
Home -
Perth City
and Towns
These actions relate to our Grand Challenges: ‘Economic Growth’(EG), ‘Technological Change’(TC), ‘Just Transition to Net- Zero’ (JTNZ) and the Prospectus for Regional Growth Priority Opportunities: ‘Clean Growth for Smarter and Sustainable Places’ (CG), ‘Tourism and Culture’ (ToC) and ‘Digital’(D).
Perth & Kinross Economic Action Plan - Progress
2025-2026
7
Page 87 of 254

Page 88

EG, TC, JTNZ, ToC Deliver the actions set out in the Strategic Tourism Infrastructure Development Plan.  This
includes investment in inclusive and accessible infrastructure, waste disposal network on
A9, walking and cycling trails, and cycle infrastructure.
Improve Perth and Kinross visitor
infrastructure to enhance the visitor
experience and ensure any
developments take into account the
requirements of local residents and
communities.
Number of visitors. 
Direct expenditure. 
Total employment within the tourism
sector.
Assess delivery against timescales set out in the Strategic Tourism
Infrastructure Plan.
Jun-25 PKC Visit Scotland.
Businesses operating within
the tourism sector.
Staff time – Existing budgets
and external funding 
TBC (Plan)- Existing budgets
and external funding
"Good progress made in delivery
of plan since its publication in
2023. Intention to refresh plan in
2026/27.
Some examples are: Tay: River
Tay Way Hub, Aberfeldy /
Grandtully Visitor Management
Facilities, South: Loch Leven
Heritage Trail, Rural Ranger
Service -  Travel Trade Training  –
Supporting businesses to
maximise opportunities through
specialist one to many webinars,
masterclasses and one-to-one
mentoring with White Stag
Tourism to ensure businesses
are trade Ready.
• Inclusive Tourism – A four-part
programme which was focused
on helping tourism businesses
communicate their accessibility
through AccessGuides. The
Access Guides were then all
hosted on Access Able
• Industry Networking &
Knowledge Sharing – Events
such as Perthshire Talks
Tourism: Foodie Edition  and
Tourism-
Strategy-
and-
Action-
Plan-2025-
2030-
updated.p
df
EG, TC, JTNZ, ToC Develop and deliver sector specific business support programmes and accelerators for the
tourism sector.
Support the growth of businesses in the
tourism sector including agri-tourism.
Total employment in the tourism sector. Tourism specific business support programme developed. Mar-25 PKC Business Gateway
GrowBiz
Visit Scotland.
£40K annually - Existing
budgets and external funding
Accelerator Programmes
delivered in Nov/Dec 25 and
Jan/Feb 26.
EG, TC, JTNZ, D Develop and deliver sector specific business support programmes and accelerators for the
creative industries and digital sector.
Increase the number of start-ups and the
growth of existing businesses in the
creative industries and digital sector.
Number of businesses operating in the
creative industries and digital sector.
Number of businesses reporting growth
in the creative industries and digital
sector.
Total employment in the creative
industries and digital sector. 
Creative industries and digital specific business support programme
developed.
Mar-25 PKC Business Gateway
GrowBiz
WASPS. 
CodeBase.
£40K annually - Existing
budgets and external funding
Accelerator Programmes
delivered in Nov/Dec 25 and
Jan/Feb 26
GCPO Action What we're aiming for KPI Action Target/Milestones Timeline Lead Partner Other Partners Costs and funding sources RAG
TI Work with employers to encourage the adoption of inclusive employment & fair work
practices including caring responsibilities
Increase the average earnings of people
working in Perth and Kinross and reduce
the number of households experiencing
or at risk of poverty
Number of employers adopting fair work
practices
Business Champions Group created 
Promotion Campaign Launched
Dec 25 
March 26
Perthshire Chamber of
Commerce,
PKC £10K – existing budgets 
£40K – existing budgets and
external funding
TBC - Action to be reviewed and
amended in September 26
TI, ST Provide business and skills support to start-ups, and grow childcare provision which meets
the needs of parents/carers
Help parents/carers and economically
inactive people to enter or re-enter
employment
Number. of places created Bespoke provision in place Jun-25 PK Business Partnership PKC (Education) £60K annually - Existing
budgets and external funding
TBC - Action to be reviewed and
amended in September 26
TI, ST Provide business and skills support to start-ups, and grow healthcare provision which meets
the needs of our rural communities
Help carers and economically inactive
people in rural communities to re-enter
and enter employment 
Number of businesses supported Bespoke provision in place Jun-25 Business Gateway, GrowBiz PKC,  £60K annually -
Existing budgets and external
funding
TBC - Action to be reviewed and
amended in September 26
TI Expand the Future for Families Programme – an integrated approach to tackling child poverty
through a combination of actions to support priority parents
Help carers and economically inactive
people to re-enter and enter employment
and reduce the number of households
experiencing or at risk of poverty
Number of families supported with
positive outcomes
New activities programme in place Jun-25 Business
Gateway, GrowBiz (this should
be Local Employability
Partnership, BG and GB have
no involvement in delivery)
PKC, Skills and Employment
Support
£100K annually - Existing
budgets and external funding
Programme in place. Exceeding
forcast engagement and
outcome targets
TI, ST Develop a new and comprehensive programme of Sector Skills Academies focussing on
local sectors where we know businesses are struggling to recruit – focus likely to be on rural
skills; transport and logistics; health & care including. childcare; hospitality & construction.
Help carers and economically inactive
people to re-enter and enter employment
and reduce the number of households
experiencing or at risk of poverty
Number of individuals successfully
completing Academies
Programme developed Jun-25 Local Employability
Partnership
PKC Skills and Employment
Support
£100K annually – Existing
budgets and external funding Sector based academeies being
delivered in Health and Social
care, Construction, Active
Leisure, Rural Skills and
Hospitality
These actions relate to our Grand Challenges: ‘Tackling Inequalities’(TI) and the Prospectus for Regional Growth Priority Opportunities: ‘Skills and Talent’(ST).
Page 88 of 254

Page 89

Action What we're aiming for KPI Action Target/Milestones Timeline Lead Partner Costs and funding sources RAG
Identify existing and
scan future available
financial resources and
agree a process
to allocate available
financial resources
Efficient sharing of financial resources  The amount of financial resources
shared among partners and the impact
on cost savings or project success.
Funding sources mapped out
Process in place
May 25 
May 25
Partnership Staff time - Existing budgets
and external funding
UK Share Prosperity Fund
process and  Programme in
place, funding allocated and
delivery. Further work needed
for other sources of funding.
Identify existing and
future Partnership’s
members capacity
and expertise, agree
Partnership’s members’
leading and supporting
roles for each action
and implement co-
training programme
Efficient sharing of staff resources The number of staff shared/funded
among partners and the impact on cost
savings or project success.
Staff capacity mapped out and roles
identified
Co-training programme developed
May 25
Sept 25
Partnership Staff time - Existing budgets
and external funding
£10K annually - Existing
budgets and external funding
Not started
Develop and agree
robust communication
channels including a
joint and shared
marketing plan
Clear joint narrative and communication Joint and shared marketing plan agreed Communication Plan agreed 
Marketing Plan agreed
May 25 
Sept 25
Partnership Staff time - Existing budgets
and external funding
£20K annually - Existing
budgets and external funding
Completed and being
implemented
Identify and agree
incentives to sustain
customers’
engagement
High level of engagement from businesses and people Benefits experienced by businesses and
people.
Incentives in place Sept 25 Partnership £20K annually - Existing
budgets and external funding
Business Champions initiative
in place - Creation of 3
Business Champions to
support visibility, credibility
and engagement of the Perth
and Kinross Economic
Partnership
Contribute to set up a
Regional Intelligence
Hub
Evidence our economic performance, place and sectoral opportunities to support our
evidence- based approach
Regional Intelligence Hub set up and
running
Regional Hub terms agreed Sept 25 Partnership £10K annually - Existing
budgets and external funding
Joint Data working group
established with Local
Employability Partnership
Develop a strong and
quality Partnership 
Efficient partnership working Participation rates in meetings, events,
and joint activities. 
1st Annual Review March 26 Partnership Staff time - Existing budgets
and external funding Partnership established and
working with good level of
participation and satisfaction
To further build on existing local and regional actions, the Partnership is also proposing to deliver the following actions:
Page 89 of 254

Page 90

Page 90 of 254

Page 91

1 
APPENDIX 2
Perth and Kinross Economic Action Plan
Communication and Engagement Plan
Supporting the Perth and Kinross Economic Action Plan (2025–2030)
Purpose
To raise awareness, build trust, and drive engagement with the Perth and Kinross Economic Action
Plan by delivering clear, consistent, and inclusive communications that reflect Perth and Kinross’s
economic priorities and opportunities.
Key Objectives
• Promote the grand challenges and priority opportunities identified in the Action Plan.
• Communicate the impact of partnership actions on local businesses, communities, and
individuals.
• Encourage stakeholder participation in delivering the plan.
• Support investment attraction and regional branding efforts.
• Leverage local business voices to promote and enhance credibility, peer to peer engagement
for the Economic Action Plan and Inward Investment propositions and prospectus. 
Target Audiences
• Local businesses and entrepreneurs 
o Engagement with this audience will be supported by a small number of Business
Champions, representing a mix of sectors, geographies (Urban / Rural) and career
stages to strengthen communication and trust. 
• Residents and community groups
• Investors and developers
• Educational institutions and young people
• Public sector partners and elected members
• National and regional economic bodies
Core Messages
• Perth and Kinross is emerging as a regenerative economy leader — an approach that is both
human-centred and nature-friendly, enabling everyone to live well, free from poverty and
inequality. This regenerative economy is anchored in innovation and growth sectors such as
clean energy, circular economy, agri-tech (including regenerative farming), and rural
innovation. It is also supported by foundational sectors including tourism, food and drink,
financial services, and care.
• The Partnership is working collaboratively to tackle inequalities, support enterprise, and
transition to net zero.
• The Action Plan is evidence-based, community-informed, and focused on delivery.
7
Page 91 of 254

Page 92

2 
• Everyone has a role to play in building a stronger, greener, and fairer economy.
Channels and Tools
• Invest in Perth and Perth City & Towns websites and social media
• PKC and partner websites and newsletters
• Video and podcast content featuring local voices and success stories
• Annual Business and Economic Summit and roundtable discussions across the region
• Local media and press releases
• Community engagement platforms and surveys
Business Champions
A small cohort of respected business leaders acting as public-facing reps for the Perth and Kinross
Economic Partnership. Business Champions will support delivery of the Communications and
Engagement Plan by:
• Providing credible, peer-led advocacy for the Economic Action Plan 
• Supporting promotion of Perth and Kinross’s inward investment opportunities 
• Participating in selected roundtable discussions and sector engagement activity 
• Contributing to Place Branding content (e.g. events, media, digital channels), supported by
PKC officers 
• Acting as ambassadors at business events, including the Annual Economic Summit
Appendix A provides details on Business Champions role and purpose.
Campaign Phases
1. Launch Phase (Sept–Dec 2025)
a. Announce the Action Plan and key initiatives.
b. Share explainer content and infographics.
c. Begin annual event planning and stakeholder outreach.
2. Engagement Phase (Jan–June 2026)
a. Host roundtable discussions.
b. Promote sector-specific programmes (e.g. tourism, clean energy, care).
c. Share progress updates and success stories.
d. Map of business awards
e. Recruit and Introduce the Business Champions as advocates for the Economic Action
Plan and region’s investment and growth ambitions. 
Page 92 of 254

Page 93

3 
i. Business Champions to support selected engagement activity, including
roundtables, sector discussions, and promotion of place and inward
investment propositions and opportunities. 
3. Delivery Phase (July 2026 onwards)
a. Host roundtable discussions.
b. Highlight milestones and KPIs.
c. Showcase investment and job creation.
d. Maintain regular updates and feedback loops. 
e. Annual Business and Economic Summit – 9th September 2026. 
i. Business Champions to act as ambassadors, hosts or contributors, supported
by PKC officers. 
Partner Support and Collaboration
• Leverage existing partner channels and networks.
• Coordinate messaging through a shared marketing plan.
• Pool resources for content creation, event delivery, and audience targeting.
Monitoring and Evaluation
• Track engagement metrics (reach, participation, sentiment).
• Collect feedback from stakeholders and communities.
• Report progress to the Partnership and PKC Committee.
• Adjust strategy based on performance and insights. 
Page 93 of 254

Page 94

4 
Appendix A – Business Champions Role and Purpose 
Purpose
To strengthen the visibility, credibility and engagement of the Perth and Kinross Economic
Partnership by appointing a small cohort of Business Champions from the local business community,
who act as trusted public facing advocates for the region’s economy and inward investment
propositions. 
Rationale
• The partnership aims to strengthen collaboration with businesses across all sectors.
• Engagement is most effective when led by respected peers from industry, reflecting a range
of sectors, geography (urban / rural), experience and perspective. 
• A recognisable business figure can help build trust, increase participation, and reinforce
delivery of the Economic Action Plan.
Business Champion Model 
Rather than a single role, the Partnership would look to appoint 2-3 unpaid Business Champions,
collectively providing;
• A balance mix of business leaders
• Representation from different sectors
• Consideration of urban and rural perspectives
• Inclusion of at least one younger leader or entrepreneur, where appropriate
Role of the Business Champions
Champions would collectively:
•  Act as independent business voices within the Partnership
• Champion Perth and Kinross’s inward investment propositions and opportunities
• Highlight opportunities and challenges facing local businesses
• Attend and or front roundtable discussions and business forums (with PKC officer support)
• Strengthen the flow of insights between the business base and the Partnership
• Act as a public-facing ambassador/champion at events and stakeholder engagements
• Help communicate the Partnership’s work and priorities to wider business audiences
• Serve as a figurehead for the proposed Economic Summit next year, with support for
preparation and delivery from PKC 
• Bring practical industry knowledge to inform decisions and help shape future priorities.
Why become a Champion? 
While unpaid, they would offer value in:
• Profile and visibility as a recognised champion for the regional economy
• Help to influence and shape strategic economic direction and priorities
Page 94 of 254

Page 95

5 
• Opportunities to shape and showcase the future of Perth and Kinross
• Enhanced networks across business, public sector and investment communities
• Association with a credible, partnership-led economic agenda
• A platform to champion issues they care about i.e business, place, people, sectors or
innovation 
This is positioned as a prestige, purpose-driven role, not a representative obligation.
Different Champions may be motivated by different drivers, including:
• Place and pride helping shape the future of Perth and Kinross
• Growth ambition attracting investment, talent and opportunity
• Sector leadership helping influence policy and delivery
• Legacy and impact supporting inclusive, sustainable economic growth
• Next-generation leadership to give younger voices a seat at the table 
Recruitment narratives can be tailored to each champion. 
Time Commitment & Support
• The role is not full-time and is designed to recognise that the Champion will be a busy
business leader with significant existing responsibilities
• Time commitment will be limited, flexible, and focused on key touchpoints such as quarterly
meetings, selected engagement events, and the new annual Economic Summit.
• The Champion will receive full support from the partnership and PKC officers with any
preparation, communications and follow-up, ensuring the role is manageable and well
supported.
Selection Approach
Champions would be identified and approached through existing business networks, including:
• Chamber of Commerce
• Federation of Small Businesses
• Perth and Kinross Business Partnership
• Sector-specific and rural business networks
Appointments would be proposed for an initial 12-month period, reviewed annually.
Expected Benefits
• Stronger engagement with the business community.
• Increased visibility and credibility of the economic partnership in the delivery of the action
plan
• Further alignment between strategy and business needs
• Greater momentum behind key initiatives.
Page 95 of 254

Page 96

Page 96 of 254

Page 97

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality
___________________________________________________________________  
Committee or Board: Economy and Infrastructure 
Date of Meeting: 26 August 2026 
Report Title:  Perth and Kinross Forestry and Woodland Strategy
(Draft) 
Report Number: 26/222 
Report Author:  Ciara Gray, Principal Planning Officer, and Joanna
Dick, Tree & Biodiversity Officer, Development Plans
Team 
Organisational Lead:  Serge Merone, Strategic Lead - Economy,
Development and Planning 
___________________________________________________________________ 
1. Purpose 
1.1 This report presents the draft of the Perth and Kinross Forestry and Woodland
Strategy (the draft FWS) which will provide a strategic framework for the
development of forestry and woodlands across the area.   
1.2 The draft FWS will: 
• Set out a local interpretation of the Scottish Forestry Strategy (2019-
2029); 
• Identify areas where the Council (PKC) will support proposals for
woodland creation and expansion, which will inform the relevant part of
Local Development Plan 3’s (LDP3) Spatial Strategy;
• Identify priority activities which PKC will encourage, and for which Scottish
Forestry Funding is available; 
• Inform Development Management decisions (including proposals for
woodland creation and removal);
• Inform consultation responses from PKC to Scottish Forestry, land and
forestry owners and managers, on forest management and woodland
creation proposals, and
• Assist with the development and approval of Long-Term Forest Plans and
Forest Management Plans. 
1.3 This report provides a summary of the content of the draft FWS and changes
since the current adopted FWS due to updated requirements under the
8
Page 97 of 254

Page 98

Planning (Scotland) 2019 Act and National Planning Framework 4 (NPF4). 
The report seeks consent to proceed to public and key stakeholder
consultation and engagement. 
1.4 Sections 
1. Purpose
2. Recommendation
3. Background/ Main Issues
4. Conclusion
5. Impact and Value Assessment
6. Strategic Environmental Assessment
7. Appendices 
2. Recommendation 
It is recommended that the Committee: 
2.1 Approve the draft Perth and Kinross Forestry and Woodland Strategy
(Appendix 1) to proceed to public and key stakeholder consultation and
engagement. 
3. Background/ Main Issues 
Historic Information/ Context 
3.1  For over 100 years, there has been a positive Government policy supporting
the effective growth and stewardship of forestry and woodlands within
Scotland. The most recent ‘Scotland’s Forestry Strategy (2019-2029)’,
provides an overview of modern Scottish forestry; sets the Scottish
Government’s 50-year vision for the nation’s forests and woodlands, and
outlines a 10-year framework for action towards achieving that vision and the
Scottish Government’s target to increase forest and woodland cover to 21% of
the total area of Scotland by 2032.   
3.2 The National Strategy seeks to put forestry policy at the centre of government,
to help deliver the aims of the National Planning Framework, and to support
the vision, objectives and principles of Scotland’s Land Use Strategy.  At its
core are the sustainable forest management standards and the need to
adhere to the principle of ‘the right tree, in the right place, for the right
purpose’. 
3.3 The adopted Perth and Kinross FWS was originally produced in 2014, and
was reviewed in 2020 to ensure that, due to its status as a piece of Local
Development Plan Supplementary Guidance, that it aligned with the newly
adopted Local Development Plan 2. The overall purpose of that FWS was to
provide a guide to the future development of woodlands and forests in Perth
and Kinross.  It identified priorities to be delivered through themes and
objectives, which were used to help guide the actions and decisions of the
Council, partner agencies and other stakeholders.  The themes and objectives
Page 98 of 254

Page 99

within the FWS related closely to the Scottish Forestry Strategy in place at
that time and sought to promote sustainable forest management with a wide
range of economic, social and environmental benefits. 
Need for an Updated Strategy 
3.4 Although the Planning (Scotland) Act 2019 removed planning guidance as
part of the statutory development plan, it also introduced, under Section 53, a
legislative requirement for planning authorities to prepare a forestry and
woodland strategy which: 
• Identifies woodlands of high nature conservation value (WHNCV), and
• Sets out the authority’s proposals as to the development of forestry and
woodlands; the protection and enhancement of woodlands (particularly
those WHNCV); the resilience of woodlands to climate change, and the
expansion of woodlands of a range of types to provide multiple benefits. 
3.5 NPF4, under Policy 6: Forestry, woodlands and trees, sets out an expectation
that Local Development Plan spatial strategies should include those matters
prescribed under the Act (as bulleted above at 3.4) and that this would be
‘supported and informed by an up-to-date Forestry and Woodland Strategy.’ 
Policy 6 also requires LDPs to ‘…identify and protect existing woodland and
the potential for its enhancement or expansion to avoid habitat fragmentation
and improve ecological connectivity, helping to support and expand nature
networks.’ 
3.6 Whilst it is considered, for the most part, that the current adopted FWS
remains relevant, it is important to carry out an update to ensure that it is fully
aligned with the National Strategy and meets the requirements of the 2019
Act and the expectations of NPF4, particularly in relation to the identification
of woodlands of high nature conservation value; the resilience of the area’s
woodlands to climate change, and the requirement for local authorities to
prepare up-to-date strategies to inform the development of new LDPs.  The
review has not led to significant changes to the existing Strategy, but it has
allowed for those updates at a national level, in terms of outcomes, priorities
and policy drivers to be reflected in the draft FWS. 
The Draft Strategy’s Purpose, Vision, Priorities and Contributing
Themes 
3.7 The draft FWS will provide a Perth and Kinross context to the most recent
Scottish Forestry Strategy; providing guidance and policy to help inform
decisions about individual planting schemes and the location of all types of
new woodland.  It will guide forestry towards appropriate locations to minimise
the likelihood of undesirable environmental or social outcomes. 
3.8 It aims to address uncertainties for land managers by identifying areas where
PKC will support proposals for woodland creation, and areas where there may
be sensitivities or constraints to woodland expansion.  It also identifies priority
Page 99 of 254

Page 100

activities that the Council will encourage, and for which funding will be
available from Scottish Forestry. 
3.9 Forestry is not subject to full planning controls; however, all aspects of forest
management are closely regulated, with operations such as planting,
restocking thinning and felling requiring permission from Scottish Forestry. 
PKC is a non-statutory consultee to Scottish Forestry for long term forestry
plans, land management plans, felling permissions and woodland creation
proposals.  The Council also provide advice to applicants as part of the due
diligence process.  The updated draft FWS will help inform the Council’s
responses to those consultations. 
3.10 Although the vision in the adopted FWS sits well with the National Strategy’s
vision it does not specifically highlight the importance of implementing
sustainable forest management, and achieving better integration with other
land uses to deliver more resilient and adaptable trees, woodlands and
forests, in response to a changing climate and nature crisis, to realise multiple
benefits for people and nature.  As such it has been updated in the draft FWS
to the following: 
3.11 “In 2046, trees, woodlands and forests are valued, protected and enhanced
through all land uses contributing towards sustainable development.
Woodlands and forests are utilised as nature-based solutions contributing
towards climate change mitigation and adaptation. Native and ancient
woodlands are protected, restored and well managed to create well
connected nature networks. Productive forests are diverse, climate-resilient,
multi-purpose, multi-benefit and sustainable. 
3.12 Woodlands and forests provide multiple benefits for nature and people and
offer opportunities for people to connect with nature. Communities in Perth
and Kinross enjoy access to inclusive and biodiverse woodlands and forests
within easy reach, connected by nature-rich blue-green networks that support
climate resilience, healthier lives and fair access for all ages. Communities are
consulted and forewarned of proposed tree, woodland and forestry proposals
in their local surroundings and engaged in community woodlands. 
Perth and Kinross is an area of exceptional trees, woods and forests, which
enhance the natural and cultural environment, support and strengthen the
local economy adding value where possible and are accessible to local people
and visitors alike across a range of activities and interests.” 
3.13 To deliver this vision, the draft FWS identifies the following 5 priorities and 10
contributing themes.  For each of those contributing themes, a set of
objectives have also been identified in the document to help support delivery.   
Priority Contributing Theme(s)
Forests and Climate Change
– improving the resilience of
our forests and woodlands,
and maximising their role in
addressing climate change
1. Climate Change Mitigation, Adaptation and
Resilience
Page 100 of 254

Page 101

Priority Contributing Theme(s)
Natural Assets,
Environmental Quality, and
Biodiversity - Maximising the
role of forests and woodlands
in contributing to the quality of
the environment, and tackling
the global nature crisis
2. Protect and enhance the environmental quality
of our natural resources (air, water, soil)
3. Help to protect, restore, maintain, and
enhance biodiversity across Perth and Kinross
4. Contribute to and help improve our
landscapes and scenery
5. Help make the most of our historic
environment
Forests and the Economy –
Maximising the role of forests
and woodlands in supporting
the economy of Perth and
Kinross
6. Productive Forests
7. Sustaining Thriving Rural Communities
Forests, Woodlands and
People – Maximising the role
of forests and woodlands to
improve the quality of life of
residents of Perth and Kinross
8. Access for Health and Wellbeing
9. Integration with Other Land Uses
Expanding our Forest and
Woodland Resource
10. Identifying Preferred and Potential Areas for
New Woodland Creation 
Proposed Policy Guidance  
3.14 The draft FWS contains policy guidance for a number of specific topic matters
which will help inform and support decision-making processes, including on: 
• Diversifying existing woodland enhancing species diversity in response to
the climate change crisis;
• Better connecting and expanding habitat networks;
• Protecting and restoring peatlands and wetlands;
• Expanding urban forests to provide multiple benefits for people, places,
species and climate change adaptation;
• Expansion of native riparian woodland;
• Protection and enhancement of the area’s air, water and soils;
• Protection, enhancement and restoration of areas designated for nature
conservation purposes;
• Protection of protected species and their habitats;
• Protection, enhancement and restoration of rare and important habitats;
• Encouraging long-term sustainable deer management;
• Identification, protection, restoration and connection of woodlands of high
nature conservation value;
• Safeguarding and enhancement of the area’s important landscapes,
wildland areas;
• Promoting good stewardship of the historic environment through design
and management;
• Promoting sustainable forest management and good forestry practice;
Page 101 of 254

Page 102

• Maximizing the role of forests and woodlands in supporting the area’s
economy;
• Maintaining and improving access for health and wellbeing;
• Promoting greater land use integration; and 
• The sustainable expansion of our forest and woodland estate. 
Proposed WHNCV and Areas of Preferred, Potential and Sensitive 
3.15 Both the 2019 Planning Act and NPF4 ask planning authorities to identify
woodlands of high nature conservation value (WHNCV).  Scottish Forestry’s
recent Technical Note on Preparing a Forestry and Woodland Strategy (2026)
describes these woodlands as: 
• Native woodland and scrub as identified by the Native Woodland Survey
of Scotland,
• Ancient woodland and ancient semi-natural woodland, including
Plantations on Ancient Woodland Sites (PAWS) and Long-Established
woodlands of Plantation Origin (LEPO),
• Woodland that is integral to the value of designated or special sites
(SACs, SPAs, SSSIs, Ramsar Sites, and National Nature Reserves
(NNRs), and
• Wood pasture. 
3.16 The Council has combined the above relevant spatial data to produce a map
of proposed woodland of high nature conservation value, which is included
within both the draft FWS (Map 3 - page 30). This map will be consulted on as
part of the engagement exercises for the draft Strategy and its Strategic
Environmental Assessment (SEA).  It will be amended, as appropriate,
following a review of feedback received. 
3.17 As previously mentioned in this report, the 2019 Act and NPF4 require
planning authorities to set out their proposals as to the development of
forestry and woodlands within their area. In terms of new woodland in a FWS,
Scottish Forestry’s 2026 Technical Note highlights that indicative maps are
typically used to “identify areas according to how easily they could
accommodate new woodland”, and these are usually categorised as
‘preferred’, ‘potential’, and ‘sensitive’ land areas.  The commonly understood
definition for these categories is also provided within the Note, and woodland
creation grant applications in any of these areas will need to meet the
requirements of the UK Forestry Standard and Forestry Grant Scheme. 
3.18 Maps of the indicative ‘Preferred’, ‘Potential’, and ‘Sensitive’ land areas for
new woodland within the Perth and Kinross area have been included within
the draft FWS (Pages 47-50) . It will also be consulted on as part of the
consultation process for the draft Strategy, and will be updated, as
appropriate, in line with feedback received. It is important to note that these
maps are indicative, and these areas are represented at a strategic scale.
However, site-specific ecological and National Vegetation Classification
(NVC) surveys will be required to inform woodland and forestry proposals. 
These requirements are set out in the draft FWS.
Page 102 of 254

Page 103

Existing Resource and Future Potential 
Existing Resource 
3.19 The area has a rich legacy of planted woodland and some of the earliest
initiatives to re-establish woodland in Scotland started in Perth and Kinross
with the Planting Dukes. Ancient woodland, semi-natural woodland and
planted native woodland including oak woodlands, coppiced woodlands and
lines of trees on drives to big houses also contribute towards the landscape
and biodiversity value of the area. Considering this woodland heritage and
tradition, it is no surprise that these woodlands have been a major contributor
to the area’s tourism industry, by helping to provide a scenic backdrop which
attracts visitors. 
3.20 In 2025, the National Forest Inventory (NFI) identified 99,353 hectares of
woodland in Perth and Kinross, covering 21.3% of the Local Development
Plan (and draft FWS) area.  The species composition of that cover is: 
• 38.3% is Conifer
• 16.6% Broadleaved
• 1.5% Mixed (Mainly Broadleaved)
• 1.5% Mixed (Mainly Conifer) 
3.21 The area’s semi-natural woodlands and associated wildlife are extremely
important. The most recent Native Woodland Survey of Scotland 2025
identifies that within the Perth and Kinross (LDP and draft FWS area) there
are 23,424 hectares (Ha) of Native Woodland, which equates to 23.6% of the
overall woodland cover across the area, and 5% of the total land area.  A
breakdown of the NWSS also tells us that: 
• 0.6% (556.9 Ha) of the area’s total woodland cover is Nearly Native;
• 2.5% (2,430 Ha) is Plantations on Ancient Woodlands Sites (PAWS), and 
• 1.9% (1,886.2 Ha) is Open Land Habitat. 
3.22 These areas include a number of important sites, such as the Caledonian
pinewoods of Rannoch and Meggernie, and the oakwoods of Lochearnside
and Strathtay. There are also many important remnant oakwoods, formerly
managed for bark and charcoal production in the 18th and 19th centuries.  In
addition, individual specimen trees, such as the Fortingall Yew, help
contribute towards the area’s rich tree and woodland heritage.   
3.23 Furthermore, they have a high priority for management and enhancement, as
well as a degree of legal protection.  Many native woodlands in the area are
highly semi-natural in their present structure and composition, with 58.3% of
the total area of native woodland in the 80-100% semi-natural category. 
3.24 Priority habitat types in Perth and Kinross include: 
• Native conifers: Scottish Pinewoods, Yew and Juniper
• Upland Birchwoods
Page 103 of 254

Page 104

• Wet Woodlands
• Upland Oakwoods
• Upland Mixed Ashwoods
• Lowland Mixed Broadleaf (Deciduous) Woodlands
• Aspen
• Traditional Orchard
• Planted Coniferous Woodlands (especially the woodland edge/glades) 
3.25 Some of the key woodland sites identified in the Tayside Local Biodiversity
Action Plan (2016-2026) include: 
• Black Wood of Rannoch: Caledonian Pinewood
• Glenartney: Juniper Woodland
• Birks of Aberfeldy
• Upper Farrochil and Strath Tumme: Upland Birchwood
• Methven Woods: Lower Mixed Broadleaf
• Drummond Hill: Planted Coniferous Woodland
• Strathtay Estate: Upland Mixed Ashwood
• Megginch Castle: Traditional Orchard 
• Loch Clunie: Wet Woodland 
3.26 Maps contained within the SEA Environmental Report for the draft FWS show
the spatial distribution of the area’s current woodland and forestry resource.  
Future Potential 
3.27 An analysis of the various spatial datasets, which were collated to formulate
the Preferred, Potential, Sensitive and Unsuitable categories within the draft
FWS, identifies that in addition to the existing 99,353 hectares of forests and
woodlands across the area, there is the potential for up to: 
• 70,190 hectares of Preferred (14.9% of the draft FWS area)
• 136,448 hectares of Potential (28.9% of the draft FWS area) 
3.28 If the Preferred area were to be planted during the lifetime of the draft FWS
this could bring the existing coverage figure up to 36% of the strategy area.  If
the Potential area were also delivered, this could increase that coverage up to
65%. 
Engagement to Date 
3.29 As part of the preparation of the Evidence Report for LDP3, the Development
Plans Team produced and consulted on a series of topic papers. These
papers set out the evidence collated and reviewed on each of the NPF4
national policies topics, and the Council’s summary of implications of those
sources of evidence for the development of the Proposed Plan.  Topic Paper
007: Forestry, Woodlands and Trees and Issue 004 of our LDP3 Evidence
Report set out much of the data and information which helped inform the
development of the draft FWS. The Council consulted a range of key
Page 104 of 254

Page 105

stakeholders on the paper, who provided comments, including NatureScot,
Scottish Water, Scottish Forestry, and Historic Environment Scotland. Some
of the stakeholders in response suggested additional sources of information
which have been considered as part of the SEA for the draft FWS. 
3.30 Engagement with Elected Members on the topic of Forestry, Woodlands and
Trees (including the likely direction of development of the draft FWS) was also
carried out as part of the Evidence Report preparation process, and a
presentation was provided to a meeting of the Convenor and Vice Convenor
of the Climate Change and Sustainability Committee earlier this year to
outline the draft Strategy’s purpose; vision, priorities and contributing themes;
proposed woodland of high nature conservation value coverage, and the list
of considerations to be taken into account in identifying the ‘Preferred’,
‘Potential’, and ‘Sensitive’ areas for woodland and tree planting across Perth
and Kinross. 
3.31 Consultations have also been carried out on specific areas of interest with
Community Greenspace, the Council’s Land Restoration Officer,
Conservation Officers, Planning Enforcement Officer (Trees), the Roads
Maintenance Partnership, and Scottish Forestry (Perth and Argyll
Conservancy). 
3.32 NatureScot, Historic Environment Scotland and SEPA were consulted on the
SEA Scoping Report. Their comments were reviewed and used to refine the
SEA methodology and some of the background data and information reported
in the Environmental Report. 
3.33 If agreed, the public and key stakeholder consultation and engagement will
provide further opportunities to receive feedback and inputs. 
4. Conclusion 
4.1 This report provides an overview of the draft of the Perth and Kinross Forestry
and Woodland Strategy (the draft FWS) which will provide a strategic
framework for the development of forestry and woodlands across the area. 
Following consideration of this report the draft FWS will be published for a
period of consultation and engagement. The document will then be reviewed
in light of any feedback received during that consultation process and a
revised version will be brought before this Committee at a later date to provide
an update on suggested changes and to seek permission to finalise and
publish the FWS. 
5. Impact and Value Assessment 
5.1 Perth ad Kinross Forestry and Woodland Strategy (Draft) Impact and Value
Assessment 
Page 105 of 254

Page 106

6. Strategic Environmental Assessment 
6.1 Supplementary Guidance - Forestry and Woodland Strategy - Perth & Kinross
Council 
7. Appendices 
7.1 Appendix 1 - Draft Forestry and Woodland Strategy (2026) 
Page 106 of 254

Page 107

1
Draft FWS July 2026
Appendix 1 
Perth and Kinross Forestry and Woodland Strategy
2026-2046 DRAFT
8
Page 107 of 254

Page 108

2
Draft FWS July 2026
Contents
Introduction ................................................................................................... 4
Vision .............................................................................................................. 5
1. Priorities and Contributing Themes........................................................ 6
2. Strategy Purpose .................................................................................... 7
2.1 Development Management/Planning .................................................. 7
2.2 Tree, Woodland and Forestry Management and Creation .............. 7
2.3 Integration with Other Land Uses .................................................... 7
3.Policy Background ....................................................................................... 8
4. Woodlands and Forestry in Perth and Kinross Today .............................. 10
4.1 Current Resource ............................................................................... 10
4.2 Current Opportunities and Challenges .............................................. 13
4.2.1 Opportunities ............................................................................... 13
4.2.2 Challenges ....................................................................................... 13
4.3 Potential Resource ............................................................................. 14
4.3.1 Land Capability for Forestry ........................................................ 14
4.3.2 Carbon Sequestration Potential .................................................. 14
4.3.2 Locally Important Soils ................................................................ 15
5. Policy Guidance ........................................................................................ 16
5.1 Forests and Climate Change ............................................................... 16
a) Diversify Existing Woodland and Enhance Species Diversity ........... 16
b) Connect and Expand Habitat Networks ........................................... 17
c) Protect and Restore Peatlands .................................................... 18
d) Expand Native Riparian Woodland .............................................. 19
e) Encourage Natural Regeneration ................................................ 19
f) Protect and Expand Urban Forests .............................................. 20
g) Unlock Nature-Based Investment ................................................ 21
5.2 Natural Assets, Environmental Quality and Biodiversity ....................... 22
a) Promote the Protection and Enhancement of Air, Water and Soils 22
b) Protect, Enhance and Restore Areas Designated for Nature
Conservation Purposes ............................................................................ 22
c) Protect and Prevent Damage to Protected Species and their
Habitats .................................................................................................... 23
d) Protect, Enhance and Restore Rare and Important Habitats .......... 23
Traditional Orchards ............................................................................. 23
Species Rich Grassland ......................................................................... 24
Upland Habitats .................................................................................... 24
Protecting and Restoring Upland Habitats ........................................... 25
Woodland and Forestry Operations in Upland Areas .......................... 25
e) Encourage Long-Term Sustainable Deer Management ................... 27
f) Identify, Protect, Restore and Connect Woodlands of High Nature
Conservation Value .................................................................................. 28
The Native Woodland Survey of Scotland ............................................... 28
The Ancient Woodland Inventory ............................................................ 28
Designated Areas .................................................................................. 29
The Ancient Tree Inventory .................................................................. 29
Page 108 of 254

Page 109

3
Draft FWS July 2026
Protecting WHNCV ................................................................................... 31
Restoring WHNCV .................................................................................... 31
Connecting WHNCV .............................................................................. 32
5.3 Landscape ........................................................................................... 33
a) Protect and Enhance the Area’s Important Landscapes, Wild Land
Areas and Wilderness ........................................................................... 33
b) Track Development .......................................................................... 34
5.4 Historic Environment.......................................................................... 35
a) Continued Protection of Tree Preservation Order Trees ............ 35
b) Promote Good Stewardship of the Historic Environment through
Design and Management ..................................................................... 35
5.5 Productive Forests .............................................................................. 37
a) Promote Sustainable Forest Management and Forestry Good
Practice ................................................................................................. 37
b) Forestry Expansion ....................................................................... 37
c) Development of Timber Transport Infrastructure ....................... 38
d) Development of Forestry Tracks .................................................. 38
e) Support for Forestry and Woodland Creation ............................. 38
5.6 Forests and the Economy ................................................................... 40
a) Big Tree Country and Support for Rural Diversification .............. 40
b) Promote the Use of Locally Grown Timber ................................. 40
5.7 Access for Health and Wellbeing ....................................................... 41
a) Urban Trees, Forestry and Woodland ......................................... 41
b) Outdoor Access ............................................................................ 41
5.8 Integration with Other Land Uses ...................................................... 43
a) Multiple Benefits through Greater Land Use Integration ........... 43
b) Agroforestry ................................................................................. 43
c) Blue Green Infrastructure (BGI) ................................................... 43
d) Trees and Woodland in Planning and Development ................... 44
e) Food Growing .............................................................................. 45
f) Renewable Energy ....................................................................... 45
5.9 Identifying Preferred and Potential Areas for New Woodland
Creation .................................................................................................... 47
a) Identifying Areas Suitable for Woodland Creation .......................... 47
b) Cross Boundary Opportunities ......................................................... 51
7. Indicators of Progress ...................................................................... 54
Conclusion .................................................................................................... 58
Glossary and Acronyms ............................................................................... 59
Appendix 1: Checklists for Woodland and Forestry Proposals.................... 63
Appendix 2: Sites Designated for Natural Heritage within Perth and Kinross
Council Boundary Area ................................................................................ 66 
Page 109 of 254

Page 110

4
Draft FWS July 2026
Introduction
As the ‘cradle of the Scottish forest renaissance’ Perth and Kinross has a
strong forestry heritage as well as some of the oldest, and most productive
forests in the British Isles hence its renown as ‘Big Tree Country’.  The
Planting Dukes of Atholl started reforesting bare land, in what was
probably the first example of establishing significant new conifer
plantations in Britain in the 18th century. Their legacy can be seen across
the region with 22 of Scotland’s recognised heritage trees within Perth and
Kinross which is more than any other Council area in Scotland.  These long-
established woodlands continue to make a significant contribution to
tourism, sustainable timber production, climate change mitigation,
biodiversity enhancement and public enjoyment of the natural
environment.  
The UK has lost a greater proportion of its natural forest cover than most
other European countries and trees and woodlands are threatened by
fragmentation, grazing pressure, increased pests, diseases and lack of
management. Nature is also in decline, and a key driver of biodiversity loss
is land-use change, which has led to habitat loss and fragmentation.  The
twin crises of climate change and biodiversity loss present complex
challenges. Trees, woodland and forests deliver a wide range of
environmental, social and economic benefits and therefore make a
significant contribution to the three pillars of sustainable development.  
The National Planning Framework 4 (NPF4) Policy 6 requires LDPs to
identify and protect existing woodland and the potential for its
enhancement or expansion to improve ecological connectivity, helping to
support and expand nature networks.  Through considering the existing
forestry, woodland, and tree assets in our area, as well as identifying
potential opportunities for enhancement and expansion via our LDP3
spatial strategy, we can help tackle the twin climate and nature crises. This
updated Forestry and Woodland Strategy identifies Woodlands of High
Nature Conservation Value for the first time, highlighting their value. 
Perth and Kinross have favourable soils and climatic conditions to make a
key contribution to creation of new multi-benefit woodlands to meet the
Scottish Government’s aspiration for woodland and forestry to cover 21%
of the total area of Scotland by 2032.  Guided by principles of the Scottish
Forestry Strategy and UK Forestry Standard, this Strategy provides policy
guidance in the local context of Perth and Kinross to guide management of
existing, and creation of new forestry and woodland to be well-managed
and sustainable. The themes and priorities reflect the complex challenges
faced and opportunities presented to balance the need to produce timber
with other policy priorities including biodiversity, climate resilience and
creating welcoming forests for people to access and enjoy. 
This Strategy supports a holistic vision where trees, woodland and forestry
form a landscape matrix, align with policies to develop connected nature
networks and offers opportunities to re-integrate woodlands into the
landscape. This will enable forestry to play an increasingly multi-functional
role in delivering valuable benefits such as carbon sequestration,
biodiversity, flood protection, recreation and health benefits.  This Strategy
covers the whole of Perth and Kinross but excludes areas within the
boundaries of the Cairngorms and Loch Lomond and the Trossachs
National Parks which have their own strategies.
Page 110 of 254

Page 111

5
Draft FWS July 2026
Vision
In 2046, trees, woodlands and forests are valued, protected and enhanced
through all land uses contributing towards sustainable development.
Woodlands and forests are utilised as nature-based solutions contributing
towards climate change mitigation and adaptation. Native and ancient
woodlands are protected, restored and well managed to create well
connected nature networks. Productive forests are diverse, climate-
resilient, multi-purpose, multi-benefit and sustainable. 
Woodlands and forests provide multiple benefits for nature and people
and offer opportunities for people to connect with nature. Communities in
Perth and Kinross enjoy access to inclusive and biodiverse woodlands and
forests within easy reach, connected by nature-rich blue-green networks
that support climate resilience, healthier lives and fair access for all ages.
Communities are consulted and forewarned of proposed tree, woodland
and forestry proposals in their local surroundings and engaged in
community woodlands. 
Perth and Kinross is an area of exceptional trees, woods and forests, which
enhance the natural and cultural environment, support and strengthen the
local economy adding value where possible and are accessible to local
people and visitors alike across a range of activities and interests.  
Page 111 of 254

Page 112

6
Draft FWS July 2026
1. Priorities and Contributing Themes
In order to achieve the Strategy’s Vision, five Priorities and ten Contributing Themes have been identified below. The priorities and themes have guided the
content of the Strategy and will inform a range of other Council plans and strategies including LDP3 and the Tayside Local Biodiversity Action Plan. It is
recognised that many of the priorities and themes are cross cutting and will provide multiple benefits. Woodland and forestry proposals should be developed
in accordance with UK Forestry Standard and the Scottish Government’s Woodland Removal Policy and be accompanied by a Long-Term Forest Plan or a
Forest Management Plan.  The Strategy focuses on a 20-year period (2026-2046). Our policy and forest policy will of course continue to change, and society’s
future demands are also likely to be different. It is therefore proposed that the Strategy will have a ‘working life’ of 10 years. 
Priorities Contributing Themes
Forests and Climate Change
Improving the resilience of our forests and woodlands, and
maximising their role in addressing climate change
1. Climate Change Mitigation, Adaptation and Resilience
Natural Assets, Environmental Quality, and Biodiversity 
Maximising the role of forests and woodlands in contributing
to the quality of the environment, and tackling the global
nature crisis
2. Protect and enhance the environmental quality of our natural resources (air,
water, soil)
3. Help to protect, restore, maintain, and enhance biodiversity across Perth and
Kinross
4. Contribute to and help improve our landscapes and scenery
5. Help make the most of our historic environment
Forests and the Economy 
Maximising the role of forests and woodlands in supporting
the economy of Perth and Kinross
6. Productive Forests
7. Forest-based Enterprises and Tourism
Forests, Woodlands and People
Maximising the role of forests and woodlands to improve the
quality of life of residents of Perth and Kinross
8. Access for Health and Wellbeing
9. Integration with Other Land Uses
Expanding our Forest and Woodland Resource 10. Identifying Preferred and Potential Areas for New Woodland Creation
Page 112 of 254

Page 113

7
Draft FWS July 2026
2. Strategy Purpose
This Strategy provides a Perth and Kinross context of the Scottish Forestry
Strategy providing guidance and policy to help inform decisions about
trees, woodland and forestry. The purpose of the Perth and Kinross
Forestry and Woodland Strategy (FWS) is to:
❖ Identify woodlands of high nature conservation value. 
❖ Provide a strategic framework for the development of trees,
forestry and woodlands in Perth and Kinross. 
❖ Set out a local interpretation of the Scottish Forestry Strategy. 
❖ Inform Development Management/Planning decisions that include
proposals for tree and woodland removal and woodland creation. 
❖ Inform consultation responses to Scottish Forestry on forest
management and woodland creation proposals. 
❖ Inform consultation responses to land and forestry owners and
managers on forest management and woodland creation proposals. 
❖ Assist with the development and approval of Long-Term Forest
Plans and Forest Management Plans. 
2.1 Development Management/Planning
The FWS is a statutory document and a material consideration in the
decision-making process. The FWS should be applied at the earliest stage
of development, including pre-application discussions, and should be used
alongside the LDP and other relevant strategies linked to throughout this
document. Where proposals depart from the policies in this Strategy, clear
justification will be required.
2.2 Tree, Woodland and Forestry Management and Creation 
Forestry is not subject to full planning controls; however, all aspects of
forest management are closely regulated, with operations such as planting,
restocking, thinning, and felling requiring permission from Scottish
Forestry. 
PKC are a non-statutory consultee to Scottish Forestry for long term forest
plans, forest management plans, felling permissions, and woodland
creation proposals. The Council also provide advice directly to applicants
prior to submission to Scottish Forestry as part of the due diligence
process. Details of what PKC provide is available in the Woodland Creation
Advice Note.
This Strategy aims to address uncertainties for land managers by providing
more detail about what PKC would like to see in proposals using PKC Policy
Guidance. The FWS also identifies areas where PKC will support proposals
for woodland creation and areas where there may be sensitivities or
constraints to woodland expansion. Guiding forestry towards appropriate
locations minimises the likelihood of undesirable environmental or social
outcomes. It also identifies priority activities that PKC will encourage and
for which funding will be available from Scottish Forestry. 
2.3 Integration with Other Land Uses
The Strategy has links with and complements other strategies and policy
documents developed or being developed by Perth and Kinross Council,
including those on landscape, renewable energy, placemaking, open space,
blue and green infrastructure, nature networks, and planning and
biodiversity.
Page 113 of 254

Page 114

8
Draft FWS July 2026
3.Policy Background 
The Town and Country Planning (Scotland) Act 1997, amended by the 2019
Planning (Scotland) Act requires planning authorities to prepare a forestry
and woodland strategy which:
• Identifies woodlands of high nature conservation value within the
planning authority’s area.
• Sets out the planning authority’s proposals as to the development of
forestry and woodlands:
i. the protection and enhancement of woodlands, in particular
those of high nature conservation value
ii. the resilience of woodlands of high nature conservation value
iii. the expansion of woodlands of a range of types to provide
multiple benefits to the physical, cultural, economic, social, and
environmental characteristics of the area, and any other
matter which the planning authority considers appropriate. 
The National Planning Framework 4 commonly known as NPF4, is required
by law to set out the Scottish Ministers’ policies and proposals for the
development and use of land. It plays a key role in supporting the delivery
of Scotland’s national outcomes and the United Nations Sustainable
Development Goals. NPF4 Policy 6 Forestry, Woodland and Trees intend to
protect and expand forests, woodland and trees. The Policy Outcomes are
that existing woodlands and trees are protected; cover is expanded and
woodland and trees on development sites are sustainably managed.
Under Policy 6, NPF4 expects Local Development Plans to:
• Identify and protect existing woodland and the potential for its
enhancement or expansion to avoid habitat fragmentation and
improve ecological connectivity, helping to support and expand
nature networks, and
• LDP spatial strategies should identify and set out proposals for
forestry, woodlands, and trees in the area, including their
development, protection and enhancement, resilience to climate
change, and the expansion of a range of types to provide multiple
benefits.  This is to be supported and informed by an up-to-date
Forestry and Woodland Strategy. 
Trees, woodland and forestry can contribute towards 15 of the 33 NPF4
Policies listed below.
Key NPF4 Policies
Sustainable places Liveable places Productive places
1: Tackling the climate and
nature crises
14: Design, quality
and place
25: Community
Wealth Building 
2: Climate mitigation and
adaptation
15: Local living and
20-minute
neighbourhoods
26: Business and
industry
3: Biodiversity 20: Blue and green
infrastructure
30: Tourism
4: Natural places 21: Play, recreation
and sport
6: Forestry, woodland and
trees
22: Flood risk and
water management 
8: Green belts
13: Sustainable transport
Page 114 of 254

Page 115

9
Draft FWS July 2026
The Scottish Government's Policy on Control of Woodland Removal gives
direction for decisions on woodland removal including that loss of
woodland should only be permitted if it results in significant public
benefits. Compensatory planting in other areas to make up for woodland
loss is expected. 
Scotland's Forestry Strategy 2019-2029 sets out the Scottish Government’s
ambition for forestry in Scotland.  It contains a 50-year vision and 10-year
framework to expand, protect and enhance Scotland’s forests and
woodlands to deliver multiple economic, social and environmental benefits
for the people of Scotland. The Strategy is underpinned by sustainable
forest management principles and includes the aspiration for woodland
and forestry to cover 21% of the total area of Scotland by 2032.
The UK Forestry Standard (UKFS) details how sustainable forestry will be
undertaken by setting out relevant legislation and good practice which all
forestry proposals must comply with. It is the standard which all forestry
proposals are assessed and provides guidance in relation to climate
change, biodiversity, landscape, soil and water. 
In addition to the UKFS, there are voluntary certification schemes including
the UK Woodland Assurance Standard which assures customers that wood
products come from sustainably managed forests in accordance with the
UKFS including the Forest Stewardship Council (FSC). 
The Right Tree in the Right Place supports the Scottish Ministers’ wish to
see a significant expansion in woodland cover across Scotland, delivering
with it multiple societal benefits. It provides advice to planning authorities
on planning for forestry and woodlands. 
The Technical Note on Preparing a Forestry and Woodland Strategy by
Scottish Forestry provides information to support planning authorities to
prepare or update their Forestry and Woodland Strategy. 
Tackling the Nature Emergency – Scottish Biodiversity Strategy to 2045
sets out a clear ambition for Scotland to be Nature Positive by 2030, and to
have restored and regenerated biodiversity across the country by 2045. It
aims for forest and woodland management to have led to sustainable
natural regeneration, nature-based solutions, and riparian woodland.
Tayside Local Biodiversity Action Plan 2016-26 sets out actions to protect
and enhance biodiversity across two Council areas: Perth and Kinross and
Angus. The Plan includes actions to protect and expand forests and
woodland, maintain and expand native woodland and encourage natural
flood management. 
PKC Climate Change Strategy and Action Plan provides a vision to achieve a
low carbon and climate resilient Perth and Kinross. Actions for Land Use
and Resilience include actions relevant to trees, woodlands and forestry.
PKC Forest Plan relates to trees and woodlands in Council ownership and
includes work plans for 36 sites and links to the Scottish Forestry Strategy. 
PKC Ash Dieback and Roadside Tree Strategy 2025 sets out how PKC will
manage ash trees on Council owned land. 
PKC Tree Planting Policy aims to ensure that any new trees planted on PKC
ground is done with a consistent approach that will promote successful
establishment within a suitable location.
Page 115 of 254

Page 116

10
Draft FWS July 2026
4. Woodlands and Forestry in Perth and
Kinross Today
The area has a rich legacy of planted woodland and some of the earliest
initiatives to re-establish woodland in Scotland started in Perth and Kinross
with the Planting Dukes. Ancient woodland, semi-natural woodland and
planted native woodland including oak (Quercus spp) woodlands, coppiced
woodlands and tree avenues also contribute towards landscape and
biodiversity. 
4.1 Current Resource
In 2025, the National Forest Inventory (NFI) identified 99,353 hectares of
woodland in Perth and Kinross, covering 21.3% of the Local Development
Plan (LDP) area, which does not include the area of Perth and Kinross
within the Cairngorms and Loch Lomond and the Trossachs National Park
boundaries.  Of that total woodland cover, 18% or 17,971.9 Ha is
categorised as Felled and Failed in the NFI.  In terms of species
composition, 38.3% is Conifer, 16.6% Broadleaved, 1.5% Mixed Mainly
Conifer, and 1.5% Mixed Mainly Broadleaved. (Map 1)
The most recent Native Woodland Survey of Scotland 2025 identifies that
within the Perth and Kinross LDP area there are 23,424 Ha of Native
Woodland, which equates to 23.6% of the overall woodland cover across
the area, and 5% of the total land area.  (Map 2) 
A breakdown of the NWSS also tells us that:
• 0.6% (556.9 Ha) of the area’s total woodland cover is Nearly Native;
• 2.5% (2,430 Ha) is Plantations on Ancient Woodlands Sites (PAWS),
and 
• 1.9% (1,886.2 Ha) is Open Land Habitat. 
These areas include a number of important sites, such as the Caledonian
pinewoods of Rannoch and Meggernie, and the oakwoods of Lochearnside
and Strath Tay.   There are also many important remnant oakwoods,
formerly managed for bark and charcoal production in the 18th and 19th
centuries.  In addition, individual specimen trees, such as the Fortingall
Yew, help contribute towards the area’s rich tree and woodland heritage.   
Many native woodlands in the area are highly semi-natural in their present
structure and composition, with 58.3% of the total area of native
woodland in the 80-100% semi-natural category.
Page 116 of 254

Page 117

11
Draft FWS July 2026
Map 1: Spatial Distribution of Current Forest and Woodland Resources 
Page 117 of 254

Page 118

12
Draft FWS July 2026
Map 2:  Spatial Distribution of the Native Woodland Survey of Scotland
Page 118 of 254

Page 119

13
Draft FWS July 2026
4.2 Current Opportunities and Challenges 
The twin crises of climate change and biodiversity loss present complex
challenges in land use planning and management. Trees, woodlands and
forests offer many opportunities to provide multiple benefits and nature-
based solutions for the benefit of nature and people. 
4.2.1 Opportunities
1. Nature based solutions: sustainably managed woodlands that maximise
carbon sequestration have considerable long-term potential to
contribute towards climate change mitigation. Carbon can be captured
by both native woodland and productive forestry and is stored in the
trees' own biomass, the forest floor litter, deadwood, and soil. As well
as carbon storage they help regulate water flows, protect soils, and
buffer the landscape and communities against increasing climate-
related risks such as flooding, drought, and wildfires. 
2. Connecting and protecting habitats at a landscape scale: native
woodlands, designated sites, peatlands and open ground habitats offer
opportunities to create Nature Networks and habitat networks on a
landscape scale enhancing biodiversity. 
3. Enhancing existing woodlands: Perthshire contains remnants of
Caledonian forest, both coniferous and broad-leaved native woodland
along with extensive tracks of timber forest which offer opportunities
for restoration, especially Long Established of Plantation Origin (LEPO)
and Plantations on Ancient Woodland Sites (PAWS). 
4. Placemaking: trees and woodlands make an important contribution to
successful places. Incorporating trees and woodlands into new and
existing places that link with existing habitat networks can provide a
range of benefits for people and nature. 
5. Community health and wellbeing: the trees, forestry and woodlands of
Perth and Kinross are well used by locals and visitors alike and provide
opportunities for further recreation with the associated benefits to
health and wellbeing and sense of community. Community led tree and
woodland initiatives present a significant opportunity. 
6. Broadleaves for quality timber: Perth and Kinross is well-suited for the
growing of broadleaves and this could form a significant part of the
future forest and woodland resource. 
7. Transport corridor creation can provide screening, trap pollutants,
improve air quality and enhance landscape quality. 
4.2.2 Challenges
1. Tree and woodland loss: there is significant pressure on some of our
most rich and ancient woodlands from development and land use
change leading to loss and fragmentation often pre-emptively before a
planning application is considered. 
2. Climate change
- Species composition change: climatic changes may alter the
suitability of growing tree species in certain areas and may lead to a
Page 119 of 254

Page 120

14
Draft FWS July 2026
reduction in native species and more non-native species, including
invasive species. 
- Urban woodlands and forests: summer water stress is likely to
increase the incidence of crown die back, windthrow and flood
damage. An increase in summer storms is particularly risky when
trees are heavy while in full leaf. 
- PKC undertook a Climate Risk and Opportunity Assessment which
predicted the complete loss of native pinewood from its case study
sites by 2080. 
3. Pests, diseases and pathogens: considerable loss of ash (Fraxinus
excelsior) trees because of ash dieback can be seen across Perth and
Kinross. Of particular concern in Scotland are Phytophthora ramorum, a
fungus-like pathogen that is a particular threat to larch, and
Dothistroma needle blight, which poses a particular threat to productive
forestry and native Caledonian pinewoods. 
4. Lack of active management results in poor condition, less diverse range
of species, age classes and open ground. 
5. High grazing pressure by deer, sheep and hare prevents natural
regeneration, reduces shrub and tree cover and damages trees. In some
areas, the high density of red deer is preventing the opportunities from
peatland restoration being realised.  
6. Poorly planned forestry can negatively impact rare and threatened
habitats such as species rich grassland, waders and botanical
assemblages unique to Tayside and of international conservation
significance.  
7. Barriers including access to land, funding, and technical support present
challenges to community led woodland initiatives. 
4.3 Potential Resource
4.3.1 Land Capability for Forestry
Perth and Kinross has favourable soils and climatic conditions to make a
key contribution to creation of new woodlands and support a wide range
of tree species. The National scale land capability for forestry (LCF) map
provides information on the potential for land across Scotland to grow
trees using several capability classes based on soil, climate and
topography.  Classes F1: Land with excellent flexibility for the growth and
management of tree crops; F2: Land with very good flexibility, and F3: Land
with good flexibility, are those areas with the greatest potential.  
Across the Forestry and Woodland Strategy area, the LCF identifies
143,348 hectares (around 30% of the land area) as being potentially
suitable for woodland (Classes F1-F3).  However, 31% of this (43,932
hectares) is identified in the 2025 National Forest Inventory (NFI) as
already having existing planting present.  
4.3.2 Carbon Sequestration Potential
The Council commissioned the James Hutton Institute (JHI) to undertake a
Carbon Sequestration Study of the Perth and Kinross Council area.  The
project focussed on the sectors of land-based industries and natural
resources, and how these can be considered when looking at the carbon
resources of the area, and its potential for sequestering or reducing
greenhouse gas emissions.
In terms of woodland expansion potential, the project report identifies
significantly higher levels of carbon sequestration potential from the
Page 120 of 254

Page 121

15
Draft FWS July 2026
planting of Production Sitka spruce, and lower from the expansion of
Native Broadleaf (after 25 years).  However, it is important to remember
the national objective of expanding native woodlands, and policy of
planting the right tree in the right place.  As such, it is most likely that a
mixed approach to planting will be most appropriate for the Forestry and
Woodland Strategy area (see section 5.10).
4.3.2 Locally Important Soils
The integration of trees on farms can provide a wide range of benefits to
farmers and communities through carbon sequestration, water
management, soil health, and supporting biodiversity. Trees can also
provide a source of materials, such as fruit, which can be used or sold.  
The subject of ‘Agroforestry’ is explored further under Section 5.8, but it is
worth noting that in terms of potential forestry and woodland resources,
whilst this Strategy seeks to protect the nationally important soils and
prime agricultural land (Classes 2-3.1) through the ‘Sensitive’ category, it
also recognises that there may be opportunities for the sensitive design
and integration of trees within agricultural landscapes on areas of Class 3.2
soils (see section 5.9).     
Page 121 of 254

Page 122

16
Draft FWS July 2026
5. Policy Guidance
Policy guidance contained within this Forestry and Woodland Strategy is
not intended to replicate or replace National Policy, the Scottish Forestry
Strategy nor the UK Forestry Standard but provide more detailed guidance
in a Perth and Kinross context.
PRIORITY 1: FORESTS AND CLIMATE CHANGE
Improving the resilience of our forests and woodlands and
maximising their role in addressing climate change. 
• Contributing Theme 1: Climate Change Mitigation, Adaptation and
Resilience 
5.1 Forests and Climate Change
Retaining trees and woodlands in their original state is always preferable
as they soak up carbon better and are more resilient to fire, storm, and
drought. Trees, woodland and forestry management must increasingly
consider the projected impacts of climate change, including warmer
temperatures, more variable precipitation, more frequent extreme
weather events and increased risk of pests, diseases and pathogens.
Trees and woodlands have an important role in flood alleviation, through
managing the flow of water.  Encouraging the incorporation of natural
flood management improvements in association with forest and woodland
creation and enhancement, including protecting and enhancing riparian
corridors; protecting natural flood storage areas; safeguarding and
improving soil conditions, and planting to help reduce the flow of water,
can result in significant positive improvements. 
Utilising the following nature-based solutions will enhance climate change
mitigation and adaptation from trees, woodland and forestry and make
them more resilient with potential to adapt in changing climatic conditions:
a) Diversify Existing Woodland and Enhance Species Diversity  
Species diversity, a high proportion of native species and sustainable
management of natural resources such as water and soil are all required to
achieve sustainable forestry. Introduced and native conifers and
hardwoods all have a part to play, and Perth and Kinross have a long and
pioneering history of a range of conifer species in early plantations.
However recent decades have seen an emphasis placed on a small number
of species especially Sitka spruce (Picea sitchensis). 
Selecting the right tree species is essential to creating forests and
woodlands that are resilient to pests, disease and environmental stresses.
Species selection must reflect both current site conditions and projected
future changes, while supporting the role of woodlands as part of wider
ecological networks. Growing a wide range of conifer and broadleaf
species with an associated diversity of silvicultural systems and avoidance
of single species or uniform planting will increase resilience and support
biodiversity.
PKC support following the principle of the right tree in the right place and
using site analysis tools such as Ecological Site Classification, local habitat
data and ecological surveys to guide decisions. 
Assisted natural migration by sourcing planting stock from Southern UK
seed zones, where evidence supports their suitability under future climatic
conditions and where appropriate will be supported. Plans must reflect
projected climate shifts while maintaining genetic diversity.
Page 122 of 254

Page 123

17
Draft FWS July 2026
b) Connect and Expand Habitat Networks 
Climate change is already shifting species distributions, altering seasonal
patterns, and placing additional pressure on fragmented habitats. As
species attempt to move and adapt in response to changing conditions,
habitat connectivity becomes increasingly critical to their survival. 
To support the Scottish Biodiversity Strategy aim to restore nature by
2045, all local authorities in Scotland will create a Nature Network by 2030
to halt and reverse biodiversity loss at a national scale. A Nature Network
connects nature-rich sites, restoration areas, and other environmental
projects through a series of areas of suitable habitat, habitat corridors and
stepping stones. Image 1 shows a simplified landscape with discrete core
areas, important for biodiversity, that are isolated from one another. It
shows various ways in which the health of these core areas, and their
positive contribution to biodiversity, can be increased.
Nature networks focus on two key aspects:
1. Connecting all sites to contribute towards the 30 by 30 initiatives
(protecting 30% of our land and water by 2030). 
2. Connecting biodiversity within and across urban, and peri-urban
landscapes, ensuring that wildlife can move from place to place.
The PKC Nature Networks Map will form part of LDP3 as required by NPF4. 
Woodlands, hedgerows, riparian corridors and peatlands will all play a
strategic role in creating Nature Networks in practice. Native woodland
creation, expansion, and management in locations that enhance habitat
connectivity, linking existing semi-natural woodlands, wetlands, grasslands
and peatlands to contribute towards Nature Networks will be supported.  
Page 123 of 254

Page 124

18
Draft FWS July 2026
PKC Policy Guidance
1. Proposals containing diverse range of species and avoiding
reliance on single species and uniform planting will be supported.
2.  Proposals of single species planting will not be supported. 
3. The development of buffer zones, stepping stones and habitat
corridors, particularly where fragmented habitats can be
reconnected to support species migration, and genetic exchange
will be supported. 
c) Protect and Restore Peatlands 
Soil is a finite resource which can, if not treated properly, be easily
damaged or destroyed. The importance of soils is reflected in NPF4 Policy 5
which aims to protect carbon-rich soils, restore peatlands and minimise
the impact of development on soil.  Peatlands in good condition store
significant amounts of carbon but degraded peatlands release carbon to
the atmosphere and contribute to poor water quality and downstream
flood risk. Warmer and drier conditions in future are likely to increase the
rate of carbon and biodiversity losses from degraded peatlands. 
Strategic integration of peatland and wetland restoration into forestry and
woodland planning and design particularly in headwaters, riparian zones,
and areas of high carbon soils, can deliver carbon storage, improved water
retention, enhanced biodiversity and improved woodland resilience by
maintaining soil moisture and reducing fire risk. 
Managing restoration of peatlands carefully is vital as damaged, poor
condition or eroded peatland can have a significant impact on drinking
water quality supplies of upland sources from increases in dissolved
organic carbon. Early consultation with the Scottish Water Sustainable
Land Management Team to determine if development proposals impact on
drinking water catchments is encouraged. 
A detailed survey of soils should be used to avoid and protect areas of
deep peat and restore them as open habitats.  Proposals must be designed
to avoid damaging adjoining peatland and aim to protect and complement
adjacent peatland restoration projects. 
Proposals should include appropriate buffers of managed open ground and
native broadleaves to prevent self-seeding conifers spreading onto
peatland habitats. Planting native wet woodland species in riparian and
transitional zones where they do not conflict with peatland integrity is
encouraged. 
Flush and mire habitat should be avoided and protected throughout
forestry management and creation. Felling should be undertaken with
appropriate machinery to avoid damage to mire habitat and no brash
should be left within 20m of mires within protected areas. Regenerating
trees in and around the wetland should be removed to prevent mires
drying out. 
Measures to restore degraded peatland such as removing trees, blocking
forest drains, controlling non-native regeneration, and installing artificial
dams will be supported. Grazing animals must be prevented from
accessing peatland restoration areas to ensure measures are successful.
Peatland Action provide advice and financial support. Peatland restoration
works may require prior notification or an application for planning
permission if permitted development rights do not apply (see section 5.3
b). 
Page 124 of 254

Page 125

19
Draft FWS July 2026
PKC will continue to work in partnership with landowners, NatureScot and
communities to encourage peatland restoration in appropriate locations. 
PKC Policy Guidance
1. A detailed soil survey should be used to avoid and protect areas
of deep peat and restore as open habitats.
2. Proposals to plant on deep peat (over 50cm in depth) will not be
supported and Class 1 and 2 soils should be avoided.  
3. Proposals should include consideration of nearby peatland
habitats and restoration projects. 
4. Proposals should include appropriate buffers of managed open
ground and native broadleaves to prevent self-seeding conifers
spreading onto peatland habitats. 
5. Opportunities for restoration of degraded peatlands will be
supported, particularly within existing designated sites. 
d) Expand Native Riparian Woodland 
Riparian planting is a nature-based solution that can improve water quality
by trapping soil and sediments, providing shade and stabilising riverbanks.
Scotland’s Third Land Use Strategy  acknowledges that planting trees as a
natural flood management technique can contribute to reducing the risks
for communities in downstream locations from the adverse impacts of
flooding. 
Trees, woodland and vegetation slow the flow of water compared to bare
and heavily grazed land and bare soil. Woodland intercepts rainfall,
increases water absorption into the soil and reduces surface flow rates,
resulting in a slowing of movement of water into rivers and from the top of
the catchment downstream.
Protecting existing and creating new native riparian woodland to deliver
natural flood management, including in headwater catchments, alongside
watercourses and on steep or erosion-prone slopes is encouraged and
should be considered as part of new flood protection schemes.
Proposals should include protecting, creating and enhancing riparian
woodland by removing invasive non-native species and conifer species and
planting native broadleaf species or encouraging natural regeneration.
Contributing and connecting to existing projects such as the Allan Water
Project in partnership with NatureScot, the UK Centre for Ecology and
Hydrology, JHI and Stirling University is encouraged. 
PKC will continue to encourage the management and expansion of riparian
woodland and protection as part of a catchment approach that contribute
towards Nature Networks.
e) Encourage Natural Regeneration
Naturally regenerating native woodland, rather than planted, ensures
carbon locked into soils remains intact, delivers carbon sequestration more
quickly and achieves wider biodiversity benefits. Forest and woodland
establishment by natural regeneration rather than or alongside planting
reduces the amount of mechanical ground preparation required which
reduces soil erosion and release of carbon locked up in soils. Natural
regeneration is also more cost effective than planting trees. PKC encourage
natural regeneration in appropriate areas through reduced grazing
pressure and deer management.
Page 125 of 254

Page 126

20
Draft FWS July 2026
PKC Policy Guidance 
1. Proposals should include protecting, restoring and creating new
native riparian woodland where watercourses are present by
removing invasive non-native species and conifer species. 
2. The strategic use of new woodland to deliver natural flood
management, including in headwater catchments, alongside
rivers, and on steep or erosion-prone slopes will be supported
and should be considered as part of new flood protection
schemes.
3. Proposals that include natural regeneration in appropriate areas
through reduced grazing and herbivore management will be
supported. 
f) Protect and Expand Urban Forests
Urban forests are much like a traditional forest, with the term
encompassing all the trees within an urban area. NPF4 aims to create
sustainable, liveable and productive places, trees and woodland can help
deliver all of these outcomes. Integration of trees and woodland into urban
and peri-urban areas also provide benefits of providing shade and shelter
thus reducing energy demands for cooling and insulating purposes,
mitigating the urban heat island effect and improving air quality. 
Some trees and woodlands are protected by existing designations such as
Tree Preservation Orders (TPOs) and Conservation Areas, and these will
continue to be protected. Retaining trees and woodlands in their original
state is always preferable and where trees have been specifically designed
and planted for public amenity and flood risk management purposes they
should be retained. 
The urban forest is constantly changing, with trees being lost as a result of
sub-optimal growing conditions, pests and diseases, new developments or
reaching the end of their life. Methodical planning for tree planting is
essential to ensure successful establishment to create a resilient, healthy
urban forest, particularly considering future challenges. Several factors
need to be considered when launching any programme of tree planting:
• Trees take several years to reach their full potential size and canopy
cover.
• Physical space above ground as trees grow and canopies extend
over and above hard surfaces. 
• Physical space below ground as trees require space for roots to
grow, typically within the first 1m depth, also used for utilities
provision.
• Annual losses from pests, disease, safety issues, or disease can
outpace gains from new planting.
PKC support protection and expansion of street trees and urban forests in
appropriate locations and have undertaken opportunity mapping to
identify suitable areas. Tree planting on PKC owned and managed land
must be in accordance with the PKC Tree Planting Policy and Open Space
Strategy. PKC also have tree planting guides for schools and communities. 
Guidance on species selection in new developments is provided in the
Open Space Supplementary Guidance. 
Page 126 of 254

Page 127

21
Draft FWS July 2026
PKC Policy Guidance
1. Proposals that include retaining trees, forestry and woodland in
their original state whilst encouraging natural regeneration will
be supported.  
2. All existing trees, hedgerows and woodland should be retained
and incorporated into development design in accordance with
the mitigation hierarchy.
3. Tree planting on PKC owned and managed land must be in
accordance with the PKC Tree Planting Policy and Open Space
Strategy. 
g) Unlock Nature-Based Investment 
As the environmental value of woodland becomes more widely recognised,
new forms of private and blended finance are emerging to support the
delivery of climate and nature outcomes. These include schemes that
reward landowners for sequestering carbon, enhancing biodiversity,
improving water quality, and supporting landscape-scale resilience. 
Perth and Kinross Council recognise the need to ensure local land
managers and communities can access and benefit from these
opportunities in a fair and transparent way. PKC will support the
development of carbon credits through the Woodland Carbon Code and
Peatland Code, enabling income generation from verified carbon
sequestration, and encourage local projects to access private finance
where it aligns with public interest objectives. 
Page 127 of 254

Page 128

22
Draft FWS July 2026
PRIORITY 2: NATURAL ASSETS, ENVIRONMENTAL QUALITY
AND BIODIVERSITY
Maximising the role of forests and woodlands in contributing to
the quality of the environment, and tackling the global nature crisis 
• Contributing Theme 2: Protect and Enhance the Environmental
Quality of our Natural Resources
• Contributing Theme 3: Help to Protect, Restore, Maintain and
Enhance Biodiversity across Perth and Kinross 
5.2 Natural Assets, Environmental Quality and
Biodiversity
When managed well, woodlands and forestry make a vital contribution to
protecting and enhancing the environmental quality of air, water and soil
resources and contribute towards tacking the climate change and nature
loss crises. 
a) Promote the Protection and Enhancement of Air, Water
and Soils
Adherence to the UK Forestry Standard is essential to protect water and
soil resources particularly in sensitive catchments in Perth and Kinross;
Loch Leven, Lunan Lochs, Dunkeld-Blairgowrie Lochs and the River Tay.
Proposals should consider any watercourses which feed into protected
areas. 
The use of continuous cover forestry (CCF) and other lower impact
silvicultural systems including group selection, shelterwood, small coupe
felling, coppice or coppice with standards are encouraged to maintain soil
carbon, limit erosion, and support ecological stability. With its diversity of
age, species and structure, CCF avoids the impacts of large-scale clear-
felling and delivers benefits of enhancing stand stability and reducing
windblow and creating forests with a more natural look. It is also the most
carbon efficient management system. 
All proposals should avoid habitat fragmentation and aim to connect
habitats by incorporating open glades, rides, transitional habitats, peatland
restoration and riparian planting where appropriate. 
PKC supports the planting of new, and managing existing, site-appropriate
woodland and trees alongside and visible from important transport routes
whilst ensuring that important views are retained. Planting smaller trees
and shrub species can provide screening, noise reduction and capture of
pollutants.
b) Protect, Enhance and Restore Areas Designated for Nature
Conservation Purposes
Perth and Kinross support many sites designated on international,
European, national and local levels (Appendix 1).  Data from 2023/24
shows 33.5% of the land within Perth and Kinross Council is protected for
nature. Designated sites play an important role in ensuring nature
conservation is at the heart of land use decision making by protecting the
most sensitive and rare habitats and species. Further information is
available on the NatureScot Sitelink website. 
Proposals within Sites of Special Scientific Interest (SSSI), Special Areas of
Conservation (SAC), Special Protection Areas (SPA) or National Nature
Reserves (NNR), or with the potential to affect them, will require
Page 128 of 254

Page 129

23
Draft FWS July 2026
consultation with NatureScot and may require a Habitats Regulations
Appraisal.
Proposals adjacent to protected areas should consider:
• Providing a buffer of native species or managed open ground to
minimise self-seeding from commercial crops.
• Measures to remove and control rhododendron (Rhododendron
ponticum), bracken (Pteridium aquilinum) and invasive non-
native species. 
• Creating and enhancing connectivity to contribute towards
Nature Networks. 
c) Protect and Prevent Damage to Protected Species and
their Habitats
Perth and Kinross support a wide range of protected species recognised by
international, European and national legislation, many of which are rare,
endangered or have faced declines in abundance. Woodland and forestry
proposals offer opportunities to enhance habitats for many species but can
also negatively impact protected species by removing or fragmenting
habitats and changing the hydrology of surrounding areas.
The Eurasian beaver (Castor fiber) is becoming widespread within Perth
and Kinross and their nickname as ecosystem engineers is evident in
creating dams and slowing the flow of water. They naturally coppice trees
that will lead to a diverse range of age and structure along riverbanks. 
Wet grassland and upland heath are important habitats for waders, some
of which have experienced declines and are considered to be of
Conservation Concern by the International Union for Conservation of
Nature.
Proposals should be informed by surveys to ascertain the constraints and
opportunities onsite and ensure site design takes biodiversity into account
at an early stage to avoids and minimise impacts to protected species and
important habitats.  PKC encourage planting native Scots pine to create
natural strongholds for red squirrel (Sciurus vulgaris). 
PKC Policy Guidance
1. Proposals that will negatively impact protected areas, protected
species and priority non-woodland habitats will not be
supported. 
2. Proposals likely to impact on waders should be accompanied by a
survey and impact assessment to waders and their habitats. 
3. Proposals within 30m of a watercourse should be accompanied
by an otter survey.
4. Proposals should avoid habitat fragmentation by incorporating
open glades, rides, transitional habitats, peatland restoration and
riparian planting where appropriate. 
d) Protect, Enhance and Restore Rare and Important Habitats
Proposals should recognise and seek to safeguard and restore
sensitive and rare habitats unique to Perth and Kinross. 
Traditional Orchards 
The Carse of Gowrie has been well known for its apple, pear and plum
orchards since the monasteries owned and farmed the grange lands in the
12th century. Often occupying the same piece of land for centuries, and
managed without chemical input, the sites are hotspots for biodiversity
Page 129 of 254

Page 130

24
Draft FWS July 2026
and have been shown to provide a refuge for over 1,800 plant, fungi and
animal species. A survey undertaken in 2007 indicated over half of the 51
documented orchards in the Carse of Gowrie no longer existed due to
agricultural practises, lack of management, tree old age and pressure from
development. Orchards are a priority habitat in the UK Biodiversity Action
Plan providing benefits for biodiversity plus landscape, amenity, food
growing and community involvement. Further information is available on
the Tayside Biodiversity Partnership website
Proposals likely to impact on traditional orchards should be accompanied
by a survey and impact assessment with measures to restore and extend
orchards. PKC will continue to protect traditional orchards through the
planning process and use of TPOs where appropriate and will continue to
request new orchard creation in all major housing developments. 
Species Rich Grassland
Perth and Kinross was historically a stronghold for species rich grassland
that has declined dramatically in recent decades and now occupy just 2%
of Scotland’s farmland grassland. Species rich grassland is a Tayside LBAP
priority habitat and is threatened by land use change including
inappropriate forestry. 
Where species-rich grassland is present, proposals should seek to restore
and manage these areas and retain as open habitats. Proposals likely to
impact species rich grassland should be accompanied by a survey and
impact assessment with measures to restore the habitat by managing it to
maintain species diversity. Further information is available from
NatureScot. 
PKC recently mapped all species rich grassland and will continue to use the
data when advising on planning applications and forestry and woodland
proposals. 
PKC Policy Guidance
1. Proposals likely to impact on traditional orchards should be
accompanied by a survey and impact assessment with measures
to restore and extend the habitat.
2. Proposals likely to impact on species rich grassland should be
accompanied by a survey and impact assessment with measures
to restore the habitat by managing it to maintain a diversity of
species. 
Upland Habitats
The present treeline in much of Scotland is below the natural limit and
montane woodland is one of Scotland's rarest and most fragmented
woodland types. It is typically found at heights of over 400 metres, and is
dominated by birch and willow, grading into montane scrub (juniper, dwarf
birch and mountain willow) and upland heath. Woolly willow (Salix lanata)
occurs locally in Tayside but is sparse elsewhere threatened by climate
change and overgrazing. Mountain heath and willow scrub are priority
habitats on the Scottish Biodiversity List and the Tayside LBAP. 
Heather moorland is the most extensive single upland habitat in Tayside
covering 12% of the whole area and are highly valued cultural landscapes.
Page 130 of 254

Page 131

25
Draft FWS July 2026
Tayside is of international conservation significance for several extremely
rare upland botanic interests including:
• Alpine milk vetch (Astragalus alpinus). Of the few sites known in
the UK, three occur in Tayside and the population is decreasing to a
critical stage. 
• Close-headed Alpine-sedge (Carex norvegica) is nationally rare, and
most populations occur in Tayside with fewer than 200 plants.
• Yellow Milk-vetch (Oxytropis campestris) is found at just three sites
in the UK: two are in Tayside, the other in the Mull of Kintyre. 
• Brown Bog-rush (Schoenus ferrugineus) is restricted to four SSSI
sites in Perthshire and one site in Selkirkshire. The plant is
vulnerable to disease as a single outbreak could potentially wipe
out an entire local population. 
Protecting and Restoring Upland Habitats
Large conifer plantations and creation of timber haul roads can negatively
impact on the upland environment and the unique assemblage of rare
species. Woodland expansion must be sensitive to open habitat priorities,
while also responding to opportunities for ecological restoration and
connecting habitats to create nature networks. 
Old ‘granny’ Caledonian pinewoods and individual trees should be retained
to seed and provide a new generation of native pines.  Ideally habitats
should be restored through natural regeneration from the existing soil
seed banks and surviving trees in gullies or inaccessible slopes if grazing is
reduced and appropriate conditions restored. In areas where there is no
viable seed source or remnant woodland nearby, targeted planting using
locally appropriate genetically diverse stock may be required. Any planting
should be designed to mimic natural structure and dispersal, using
scattered trees and clumps that can act as future seed sources.
Montane woodland restoration could slow rainfall and improve upland
landscapes by removing the sharp transition between afforested and open
habitats. Many bird species would benefit from transition zones between
forest and moorland heath and feathered edge forestry including ring
ouzel (Turdus torquatus) and black grouse (Tetrao tetrix). 
The National Trust for Scotland has pioneered methods of regenerating
montane willows and other rare plants at Ben Lawers National Nature
Reserve. The reserve has the largest abundance of arctic-alpine plants in
the UK including snow gentian (Gentiana nivalis) which is unique to Tayside
and Alpine forget-me-not (Myosotis alpestris) which is restricted to Tayside
and Upper Teesdale. It is also the UK’s most important site for lichens,
home to over 500 lichen species.  
Woodland and Forestry Operations in Upland Areas
Woodland creation or restoration in upland areas should be carefully
designed to support species-specific conservation and reduce pressures
from grazing and climate stressors. National Vegetation Classification
(NVC) surveys should be used to avoid sensitive open habitats and impacts
to climate-vulnerable species, especially those that are range-restricted. 
Early consultation with Tayside Raptor Study Group is recommended to
identify any core nesting or foraging areas within the disturbance distance
for the species protected within the designated sites. Guidance is available
from NatureScot. 
Page 131 of 254

Page 132

26
Draft FWS July 2026
Proposals for native woodland creation should include a diverse range of
native tree species, soft edges, gradual transitions of habitats and
landscape sensitivities. 
PKC encourage natural regeneration of treeline woodland in appropriate
areas particularly through reduced grazing pressure and deer
management. There is a presumption against conifer plantations in areas
of sensitive habitats and ornithological interests. Early consultation with
the PKC Woodland Enquiries Team and NatureScot is encouraged. 
PKC Policy Guidance
1. All proposals should seek to protect, enhance and restore sensitive
and rare habitats informed by surveys including NVC. 
2. Proposals that avoid sensitive open habitats, such as dry heath, wet
heath, juniper and breeding bird areas of high conservation value
are more likely to be supported.
3. Proposals to support natural regeneration and low-density native
woodland expansion in upland areas where this strengthens Nature
Networks and improves landscape resilience will be supported. 
4. Single species conifer plantations in areas of sensitive habitats and
ornithological interests will not be supported. 
5. Proposals to restore, enhance and connect montane scrub and
woodland where appropriate informed by ecological surveys
including NVC will be supported.
6. Proposals to create transition zones to restore lost or vulnerable
habitats such as montane willow scrub, aspen and juniper will be
supported.
7. Proposals that will result in the loss of montane woodland types,
such as juniper, will not be supported.
8. Proposals to restore degraded upland woodland habitats using
natural regeneration will be supported. 
Page 132 of 254

Page 133

27
Draft FWS July 2026
e) Encourage Long-Term Sustainable Deer Management 
Deer are a natural part of a woodland ecosystem but at high densities
negatively impact the ecological condition of native woodland, prevent
natural regeneration and damage trees through bark stripping, browsing
and fraying. The 2025 NatureScot Deer Count Density estimated deer
populations living on the open range which are habitats used mainly by red
deer including heather moorland. It shows that the northern uplands of
Perth and Kinross have high red deer (Cervus elaphus) numbers. Less data
for the other deer species found in Perth and Kinross is available but roe
deer (Capreolus capreolus) numbers have increased over recent decades.
PKC support the recommendations made by the Deer Working Group in
2018 in the Management of Wild Deer in Scotland Report. 
Robust deer management, preferably sustainable deer control, should
form part of forestry and woodland proposals. Deer control is a more
sustainable and long-term approach to deer population management than
fencing. Deer fencing requires ongoing inspection and maintenance,
prevents movement of other mammals such as badgers (Meles meles), and
can exacerbate erosion and habitat damage. A reduction in deer fencing
also reduces negative landscape impacts and creates more open and
welcoming forests and woodlands for people to access and enjoy.
Furthermore, deer control can improve the ecological condition of
protected areas, peatlands and other habitats. 
Large sites and those adjacent to protected areas should be accompanied
by a Deer Management Plan in collaboration with neighbouring
landowners and Deer Management Groups. If fencing is required,
consideration to landscape, outdoor access and wildlife impacts is required
with consideration of badger gates. Any fencing in or near existing
woodland known to contain capercaillie (Tetrao urogallus) or black grouse
must conform to guidance on avoiding bird strikes. Deer fences should be
removed once trees and woodlands are established. Further information
on deer management is provided by NatureScot. 
PKC Policy Guidance
1. Proposals that include sustainable deer management through deer
control will be supported. 
2. Proposals that rely wholly on deer fencing will not be supported. 
3. Large sites and those adjacent to protected areas should be
accompanied by a Deer Management Plan in collaboration with
neighbouring landowners and Deer Management Groups 
Page 133 of 254

Page 134

28
Draft FWS July 2026
f) Identify, Protect, Restore and Connect Woodlands of High
Nature Conservation Value
Native and ancient woodlands and veteran trees provide considerable
biodiversity, landscape, amenity, tourism and recreation benefits as well as
soaking up carbon. They provide Perth and Kinross with unique character
and renown as ‘Big Tree Country’ including the Fortingall Yew which is
believed to be the UK's oldest tree, with an estimated age of between
2,000 and 3,000 years. 
NPF4 requires Forest and Woodland Strategies to identify Woodland of
High Nature Conservation Value (WHNCV). The Scottish Forestry Technical
note on preparing a Forestry and Woodland Strategy describes a
‘woodland of high nature conservation value’ as 
• Native woodland and scrub as identified by the NWSS [but note the
nativeness is not a requirement for the other categories listed
below],
• Ancient woodland and ancient semi-natural woodland, including
Plantations on Ancient Woodland Sites (PAWS) and Long-
Established woodlands of Plantation Origin (LEPO),
• Woodland that is integral to the value of designated or special sites
(SACs, SPAs, SSSIs, Ramsar sites, and NNRs), and
• Wood pasture.
No single dataset provides a complete picture of trees and woodland of
high nature conservation value in Perth and Kinross.  However, in
combination, the Native Woodland Survey of Scotland, the Scottish Ancient
Woodland Inventory, coupled with designated areas data, and the Ancient
Tree Inventory allows us to identify WHNCV across the Council area. Map 3
to follow shows the spatial distribution of the proposed WHNCV with the
Strategy area. 
The Native Woodland Survey of Scotland
Native woodlands are defined as woods in which over 50% of the canopy is
made up of species native to the region. The NWSS identified and mapped
the location, extent, type, and condition of all of Scotland's native
woodlands in 2014 including semi-natural (self-sown) or planted.  Native
woodland is of considerable biodiversity value due to their varied form,
uneven age structures, mix of native tree species, open space, deadwood
and natural processes. All native woodland types are UK Biodiversity
Action Plan priority habitats due to being threatened and many require
management to improve them for nature conservation. 
The Ancient Woodland Inventory
In Scotland, Ancient Woodland is defined as land that is currently wooded
and has been continually wooded, at least since 1750. The Ancient
Woodland Inventory (AWI) is a provisional guide to the location of Ancient
Woodland derived from the Roy maps (c1750) and the OS 1st edition
(c1860). The AWI contains three main categories of woodland, all of which
are likely to be of value for biodiversity and cultural by virtue of their
antiquity:
1. Ancient Woodland (1a and 2a)
Interpreted as semi-natural woodland from maps of 1750 or 1860
and continuously wooded to the present day. If planted with non-
native species during the 20th century they are referred to as
Plantations on Ancient Woodland Sites (PAWS). 
Page 134 of 254

Page 135

29
Draft FWS July 2026
2. Long-established woodlands of plantation origin (LEPO) (1b and 2b)
Interpreted as plantation from maps of 1750 (1b1) or 1860 (2b) and
continuously wooded since. Many of these sites have developed
semi-natural characteristics, especially the oldest ones, which may be
as rich as Ancient Woodland.
3. Other woodlands on ‘Roy’ woodland sites (3)
Shown as unwooded on the 1st edition maps but as woodland on the
Roy maps. Such sites have, at most, had only a short break in
continuity of woodland cover and may still retain features of Ancient
Woodland. 
Ancient woodland is an important and irreplaceable habitat that cannot be
replicated due to the complex association over time. They include all
remnants of Scotland’s original woodland; their flora and fauna may
preserve elements of the natural composition of the original Atlantic
forests. Ancient woodland often contains veteran trees that are of
considerable biodiversity value providing habitats for rare fungi,
invertebrates, lichens, birds and bats. Their structural complexity provides
many habitat niches that do not co-exist on younger trees. They preserve
the integrity of soil ecological processes and associated biodiversity, and
some have been managed using traditional methods for centuries. 
Designated Areas
The Perth and Kinross area contains a wealth of international and national
designated sites, or protected areas, to help ensure that the natural
features of special interest within them remain in good health for the
benefit of current and future generations. Woodlands form an integral part
of a number of these sites and are essential for habitats and species due to
the unique and complex ecosystem structures they offer which help
support a diverse range of habitats and wide variety of wildlife.  
The Ancient Tree Inventory
The Ancient Tree Inventory (ATI) is a project managed by the Woodland
Trust which allows users to record and map the UK’s oldest and most
ecologically significant trees to help support their conservation. The ATI
includes ancient, veteran, and notable trees. Ancient and veteran trees
provide important habitats for a range of species, including fungi, insects,
birds, and mammals. They also play a role as ‘living monuments’
connecting people to their surrounding natural and historical landscapes. 
The main purposes of the ATI are linked to the conservation of trees which
are essential for wildlife and biodiversity; the preservation of trees which
have significant ecological, cultural, or historical value, and also providing a
source of data for the purposes of environmental education, ecological
studies, and raising awareness of the importance of these trees with the
public. 
Page 135 of 254

Page 136

30
Draft FWS July 2026
Map 3: Proposed Woodlands of High Nature Conservation Value
Page 136 of 254

Page 137

31
Draft FWS July 2026
Protecting WHNCV
NPF4 Policy 6 b) states development proposals will not be supported
where they will result in:
i. Any loss of ancient woodlands, ancient and veteran trees, or
adverse impact on their ecological condition;
ii.  Adverse impacts on native woodlands, hedgerows and individual
trees of high biodiversity value, or identified for protection in the
Forestry and Woodland Strategy.
iii. Fragmenting or severing woodland habitats, unless appropriate
mitigation measures are identified and implemented 
As trees and woodlands of high nature conservation value cannot be
readily replaced, it is particularly important to protect them from threats,
including development and other land-uses. PKC will protect ancient trees
and woodlands, and veteran trees from adverse impacts, loss or damage
through designation and policies in the Local Development Plan and any
other appropriate means such as TPOs. 
Perth and Kinross Council will prioritise protection from further damage
and fragmentation where trees are healthy and structurally sound. The
presumption against woodland removal as per national guidance, the
Scottish Government Policy on Control of Woodland Removal, will be
followed. 
Proposals must be informed by detailed surveys and follow the mitigation
hierarchy of avoid, reduce, compensate and enhance (see section 5.9 d). 
To protect WHNCV from development, a buffer of at least 50m from
woodlands plus root, crown and future-growth space for veteran trees is
required to reduce ground disturbance and reduce the potential of
invasive non-native species spreading from gardens by creating a strong
boundary between the two land uses. It will also help reduce impacts of
increased noise, disturbance and lighting on woodland dwelling species.
The buffer allows space to grow and in time will become valuable to
biodiversity and amenity.
Restoring WHNCV
Perth and Kinross contain remnants of Caledonian forest, both coniferous
and broad-leaved native woodland along with extensive tracks of timber
forest.
Restoration of PAWS is encouraged to retain remnant features of ancient
semi-natural woodlands and restore the site to woodland comprising site
native species. Where forestry is proposed adjacent to PAWS, native
species are encouraged. LEPO is not included in the definition of WHNCV
but offer opportunities for restoration. Proposals for LEPO should contain a
higher proportion of low impact silviculture systems, long-term retention
areas with a diverse species mix and high proportion of native species. Any
veteran trees within PAWS and LEPO should be protected. Guidance is
available from Natural England. 
Granny pines are old, lone and wide-crowned Scots pine trees which have
survived the last 2-300 years. They should be retained so they can seed
and provide a new generation of native pines. Removing non-native
species from old Caledonian forests and replacing with Scots pine is
supported.  Removal of bracken and invasive non-native species from
HHNCV is encouraged. 
Page 137 of 254

Page 138

32
Draft FWS July 2026
Connecting WHNCV 
A significant threat to woodlands of high nature conservation value is
fragmentation and pockets of woodland isolated from each other in the
landscape surrounded by other land uses. Following the principle of bigger,
better and more joined up, Nature Networks (see section 5.1 b) offers
opportunities to restore, expand and connect WHNCV making them more
resilient and biodiverse. The expansive network of the River Tay SAC
provides a network often associated with native species including oak, ash
and elm due to the rugged terrain offering opportunities for enhanced
riparian woodland (see section 5.1 d).
Perth and Kinross Council is committed to promoting a county wide Nature
Network by 2030 and will continue to promote connecting WHNCV
alongside the Nature Network and other habitat networks throughout the
region. 
PKC Policy Guidance 
1. Proposals that will result in loss of WHNCV will not be supported. 
2. Proposals that will protect, restore, enhance and connect
WHNCV will be supported. 
3. Positive management to diversity the age and structure and
increase the proportion of native species through planting and
natural regeneration will be supported. 
4. Restoration of PAWS to retain remnant features of WHNCV and
restore the site with a high proportion of native species will be
supported. 
5. Proposals should include a buffer of at least 50m to protect
WHNCV from development. 
Page 138 of 254

Page 139

33
Draft FWS July 2026
5.3 Landscape
The landscape within Perth and Kinross is divided into two main units:
Highland Perthshire and Lowland Perthshire and Kinross and are
distinguished by the Highland Boundary Fault reflecting the geology,
topography, vegetation, and land use of those areas.  High quality, distinct
and diverse landscapes contribute to the social and economic well-being of
the region. 
a) Protect and Enhance the Area’s Important Landscapes,
Wild Land Areas and Wilderness 
The Tayside Landscape Character Assessment provides a baseline
understanding of landscape variation, helping planners, developers, and
land managers make informed decisions and ensuring that development
respects the natural and cultural character of the region.
Development and land use change, including forestry and creation of new
hill tracks, should be compatible with the distinctive characteristics and
features of Perth and Kinross’s landscapes.
Wild Land Areas are the most extensive areas of wild land, largely semi-
natural landscapes that show minimal signs of human influence. They are
identified as nationally important in NPF4 Policy 4 due to their cultural,
recreational and nature conservation value. A large proportion of Perth
and Kinross (19%) is within the top fifth of overall relative wilderness
values. Comparatively just 5% of Scotland falls within this quintile.  
The NatureScot Wild Land Areas Map and Descriptions identifies five Wild
Land Areas partly that largely overlap with the 11 Local Landscape Areas
within Perth and Kinross below. 
Wild Land Areas Local Landscape Areas
Ben Lawers Ben Vrackie
Breadalbane-Schiehallion Glen Almond and the Sma’ Glen
Cairngorms Glen Quaich
Lyon-Lochay Loch Leven and Bishop Hill
Rannoch-Nevis- Mamores-
Alder
Loch Lyon and Loch an Daimh 
Loch Tay 
Ochill Hills 
Rannoch Forest 
Sidlaw Hills 
Upper Strath Tay 
Upper Strathearn 
Proposals within Local Landscape Areas must demonstrate they will not
have a significant adverse effect on the special qualities listed in the
Landscape Supplementary Guidance  and contain a high proportion of
native broadleaf species. 
To improve landscape aesthetics and amenity, existing woodlands, forests
and plantations should be restructured to diversify age and species
PRIORITY 2: NATURAL ASSETS, ENVIRONMENTAL QUALITY
AND BIODIVERSITY
Maximising the role of forests and woodlands in contributing to
the quality of the environment, and tackling the global nature crisis 
• Contributing Theme 4: Contribute to and help improve our
landscapes and scenery
Page 139 of 254

Page 140

34
Draft FWS July 2026
structures, softer edges and open spaces to create mosaics of colour and
form. 
b) Track Development
Harvesting and timber extraction may adversely affect landscape and
wildness through creation of tracks and haul roads. This should be
considered and minimised in proposals.
Development such as the creation of new tracks, alterations to existing
tracks or roads, formation of vehicular accesses, erection of enclosures
(e.g. deer fencing) and peatland restoration works may require ‘prior
notification’ or an application for planning permission if permitted
development rights do not apply under The Town and Country Planning
(General Permitted Development) (Scotland) Order 1992. 
Planning applications can be submitted online via the eDevelopment
Scotland portal. To minimise errors with an application at validation stage,
relevant submission checklists can be found on the Planning and Building
section of our website. An applicable planning fee may be required. Should
you have any general planning queries you can call 01738 475300 during
normal office hours and ask for our Duty Planning Officer. They shall be
able to offer general advice or might advise you to submit a pre-application
enquiry for further review. 
PKC Policy Guidance 
1. Proposals that may impact Wild Land Areas should be
accompanied by an impact assessment and any impacts reduced
by siting, design or other mitigation.
2. Proposals within Local Landscape Areas must demonstrate they
will not have a significant adverse effect on the special qualities.  
3. Management of and the creation of tree avenues and orchards in
appropriate locations to reflect traditional landscapes in Perth
and Kinross is encouraged. 
4. Proposals to plant new, and manage existing, site-appropriate
woodland and trees alongside and visible from important
transport routes will be supported. 
Page 140 of 254

Page 141

35
Draft FWS July 2026 
5.4 Historic Environment
Ancient woodlands, veteran trees, earthworks, ruined structures, and
buried archaeological features provide useful information about past
societies and how they used and managed the land, including forests and
woodlands. Ancient woodlands are often associated with designed
landscapes and historic buildings serving as living monuments and creating
a sense of place. Underneath the soil, historic underground infrastructure
such as cundies and culverts assists with drainage.
a) Continued Protection of Tree Preservation Order Trees
All tree groups, tree lines and individual trees covered by a Tree
Preservation Order (TPO) and within a Conservation Areas are protected
from pruning, lopping, and felling.  Any management work to trees which
are subject to a TPO or within a Conservation Area require consent from
the planning authority. Locations of Conservation Areas, TPOs, and
Gardens and Designed Landscapes are available on the PKC Heritage Map.
Felling operations within Conservation Areas will require more justification
and consideration of the impacts to amenity and landscape value. PKC will
continue to promote new TPOs where appropriate. 
b) Promote Good Stewardship of the Historic Environment
through Design and Management
Historic Environment Assets 
Forestry and woodland proposals should identify and protect designated
and non-designated features of the historic environment and their settings
and consider preservation and enhancement of cultural landscapes.
Proposed woodland creation within Inventory Gardens and Designed
Landscapes and on Inventory Battlefields will require consultation with
Historic Environment Scotland. 
Good stewardship of the historic environment through forest design and
sensitive management using initiatives such as Perthshire Big Tree Country
and the Perthshire Conifer Conservation Programme to underpin the long-
term future of historic landscapes and tree-related features is encouraged.
PKC will continue to protect ancient and veteran trees as living monuments
with historical, landscape, amenity and biodiversity value. 
Archaeological Features
Forestry and woodland proposals can impact on features of the historic
environment and considering them early in the design process is vital to
mitigate impacts. Early consultation with Perth and Kinross Heritage Trust
is recommended. Buffer zones should be used to protect any
archaeological features of importance from operations. If any new or
suspected features of interest are uncovered during forest management
operations, they should be immediately protected by establishment of a
buffer zone and findings reported to the Perth and Kinross Heritage Trust.
PRIORITY 2: NATURAL ASSETS, ENVIRONMENTAL QUALITY
AND BIODIVERSITY
Maximising the role of forests and woodlands in contributing to
the quality of the environment, and tackling the global nature crisis 
• Contributing Theme 5: Help make the most of our historic
environment
Page 141 of 254

Page 142

36
Draft FWS July 2026
Geodiversity Sites 
Rocks, fossils and geomorphological elements such as moraines, eskers
and drumlins are important for cultural heritage and biodiversity.
Proposals should aim to protect and enhance geological and
geomorphological elements on the landscape. Impacts can be avoided by
ensuring trees do not affect or block views of important features. PKC has
identified potential Geodiversity Sites which following assessment will be
designated and published. 
PKC Policy Guidance 
1. Proposals should identify and protect features of the historic
environment and their surroundings through consultation with
the Perth and Kinross Heritage Trust. 
2. Proposals which adversely impact features of the historic
environment, and their settings will not be supported. 
3. Proposals should protect ancient and veteran trees as living
monuments with historical, landscape, amenity and biodiversity
value.
4. Proposals that adversely affect the access to or appreciation of
identified geological features will not be supported.   
Page 142 of 254

Page 143

37
Draft FWS July 2026
5.5 Productive Forests
Scottish Government policy supports the expansion and sustainable
management of productive forests as a valuable source of timber and
wood fuel for energy production. Perth and Kinross have favourable soils
and climatic conditions to make a key contribution to creation of new
multi-benefit woodlands to meet the Government’s aspiration for
woodland and forestry to cover 21% of the total area of Scotland by 2032. 
a) Promote Sustainable Forest Management and Forestry
Good Practice 
Well-managed productive forests can deliver multiple benefits and balance
the need to produce timber with other policy priorities including
biodiversity, climate resilience and creating welcoming forests for people
to access and enjoy. All proposals must be in accordance with the UK
Forestry Standard and must ensure management and contingency plans
address the impacts of climate change.
Productive forestry should not conflict with other policies within this
Strategy to create climate resilient forests fit for the 21st century. Species
diversity, a high proportion of native species and sustainable management
of natural resources such as water and soil are all required to achieve this.
Introduced and native conifers and hardwoods all have a part to play, and
Perth and Kinross have a long and pioneering history of a range of conifer
species in early plantations. However recent decades have seen an
emphasis placed on a small number of species especially Sitka spruce.
Growing a wide range of conifer and broadleaf species with an associated
diversity of silvicultural systems will be supported. Proposals to create
single species and monocultures will not be supported. 
Proposals for productive forestry should include species diversity (see
section 5.1 a), seed source and provenance, long term retention areas of
native woodland and buffer zones. Long Term Forest Plans and Forest
Management Plans should be created as a basis for felling permissions, to
assist with the restructuring of existing productive plantations to enhance
their landscape, biodiversity, and recreational value. Proposals to manage
plantations to increase light levels, enhance structural and species diversity
and to provide deadwood will be supported. Deadwood is one of the
greatest ecological resources in a forest with a fifth of woodland species
dependant on it during a part of their lifecycle.
Harvesting should be carefully planned to minimise impacts to biodiversity
and public access. Clear felling should be minimised and seed-bearing
native trees retained to ensure some continuous cover forestry.
Communities should be forewarned of proposed tree, woodland and
forestry proposals likely to impact their local surroundings. 
b) Forestry Expansion
With the management and expansion of WHNCV (see section 5.2 f), there
is potential for productive forestry to form part of wider woodland habitat
networks and Nature Networks, increasing connectivity. The management
and expansion of WHNCV will often create a landscape framework within
PRIORITY 3: FORESTS AND THE ECONOMY
Maximising the role of forests and woodlands in supporting the
economy of Perth and Kinross
• Contributing Theme 6: Productive Forests
Page 143 of 254

Page 144

38
Draft FWS July 2026
which productive woodland can exist. Expanding the forest area managed
under low impact silvicultural systems and continuous cover forestry
where natural regeneration is the main recruitment method is encouraged. 
Incorporation of natural flood management improvements in association
with forest and woodland creation and enhancement, including protecting
and enhancing riparian corridors; protecting natural flood storage areas;
safeguarding and improving soil conditions, and planting to help reduce
the flow of water, can result in multiple benefits and is encouraged. 
Early consultation with the Scottish Water Sustainable Land Management
Team to determine the location of Drinking Water Protected Areas as well
as water and/or wastewater infrastructure is encouraged. 
c) Development of Timber Transport Infrastructure 
Proposals requiring new roads for timber operations should determine the
potential impacts of the route and potential runoff of the proposed roads
into watercourses and wetland habitats.
PKC encourages developing timber transport infrastructure through
mechanisms such as the Strategic Timber Transport Fund and through
partnerships such as the Timber Transport Forum and regional Timber
Transport Groups (TTGs) Guidance is available from the Timber Transport
Forum. 
The agreed timber routes can be viewed on the interactive map covering
Stirling and Tayside TTG. PKC encourage early engagement with the Roads
Maintenance Partnership.
d) Development of Forestry Tracks 
Development such as, but not limited to, the creation of new tracks,
alterations to existing tracks or roads, formation of vehicular accesses, may
require ‘prior notification’ or an application for planning permission if
permitted development rights do not apply under permitted development
rights. 
Planning applications can be submitted online via the eDevelopment
Scotland portal. To minimise errors with an application at validation stage,
relevant submission checklists can be found on the Planning and Building
section of the PKC website. An applicable planning fee may be required.
Should you have any general planning queries you can call 01738 475300
during normal office hours and ask for our Duty Planning Officer. 
e) Support for Forestry and Woodland Creation
Financial assistance is available from Scottish Forestry and as part of the
due diligence process, require land managers seeking grant assistance to
develop their proposal to take account of sensitivities prior to submission
to Scottish Forestry. 
Perth and Kinross Council are a consultee to Scottish Forestry for long term
forest plans, land management plans, felling permissions and woodland
creation proposals. PKC will continue to provide advice directly to
landowners and managers as part of the due diligence process. 
We encourage early engagement via WoodlandEnquiries@pkc.gov.uk. A
checklist of information required to accompany a forestry and woodland
consultation request to PKC is provided in Appendix 1. Applicants are
encouraged to ensure information is submitted in accordance with this
checklist to allow PKC to provide detailed comments.
Page 144 of 254

Page 145

39
Draft FWS July 2026
PKC Policy Guidance 
1. Proposals that improve age, structure and species diversity and
maximise the economic potential of the area’s timber resources
will be supported. 
2. Proposals consisting of a single species or high percentage of
non-native conifer species will not be supported. 
3. Proposals with a diverse range of species including native conifer
and broadleaf species with areas of open ground to deliver
multiple benefits will be supported.   
Page 145 of 254

Page 146

40
Draft FWS July 2026 
5.6 Forests and the Economy
Forestry and wood processing contributes to the Scottish economy
providing many jobs located in rural and disadvantaged areas. Forest-
based sport and recreation as diversification also contributes to the local
economy. Rural diversification, integration with other land uses and a
diverse range of forest-based enterprises offer opportunities for growth, 
a) Big Tree Country and Support for Rural Diversification
Perth and Kinross’s reputation as ‘Big Tree Country’ helps support a
thriving tourism sector using the area’s iconic and internationally famous
heritage trees as a model of cultural and natural heritage integration. 
Development of appropriate tourism infrastructure, such as visitor centres,
Core Path Networks and long-distance footpaths that maximise delivery of
public benefits are encouraged. All developments must protect and
enhance trees, woodlands and forestry (see section 5.9 a). 
b) Promote the Use of Locally Grown Timber
The carbon sequestration potential in productive forestry is enhanced if it
is then used for timber as a traditional construction material replacing
more carbon-intensive materials that can reduce indirect emissions and
help decarbonise construction. Use of locally grown timber to reduce
imports would lead to more sustainable settlements and help protect
biosecurity by reducing the risk of importing pests, diseases and invasive
non-native species. PKC will encourage use of Scottish timber in
construction through raising awareness and encouraging wider uptake of
forest certification such as the Woodland Assurance Scheme (WAS) and
the Forest Stewardship Council (FSC). 
PKC Policy Guidance 
1. Proposals that maximise the role of forests and woodlands in
supporting the economy and sustaining thriving rural
communities without compromising other land use values will be
supported.
2. Development of appropriate tourism infrastructure to maximise
delivery of public benefits must also protect and enhance trees,
woodlands and forestry. 
PRIORITY 3: FORESTS AND THE ECONOMY
Maximising the role of forests and woodlands in supporting the
economy of Perth and Kinross
• Contributing Theme 7: Sustaining Thriving Rural Communities
Page 146 of 254

Page 147

41
Draft FWS July 2026 
5.7 Access for Health and Wellbeing
Trees, woodlands and forestry help improve the quality of places where
we live and work, create opportunities for communities to get involved in
managing and owning woodlands, encourage healthier lifestyles and
support education, training and social enterprise. There can also reduce
exposure to poor air quality and the likelihood of air-quality related health
issues. 
a) Urban Trees, Forestry and Woodland
Trees are essential to public health and wellbeing, yet not everyone has
good access to trees and their benefits where they live. The Tree Equity
Score UK is a map-based application to help address disparities in urban
tree distribution by identifying the areas in greatest need of people-
focused investment in trees.
The Tree Equity Score currently only covers Perth City and Invergowrie
with a proposed extension to an additional eight smaller towns if funding is
secured. In Perth City, one third of the data zones require action to
increase tree cover and improve tree equity. 
PKC commissioned opportunity mapping for Perth and nine other large
settlements in 2025 to better understand gaps in canopy cover and target
tree planting resources. This will be used to ensure trees and woodland
contribute towards the wider social agenda tackling inequalities, ensuring
equal opportunities and increased qualify of life.
PKC support the expansion of street trees and urban forests in appropriate
areas. Tree planting on PKC owned and managed land must be in
accordance with the PKC Tree Planting Policy and Open Space Strategy.
PKC also have tree planting guides for schools and communities. 
PKC will continue to engage with communities on tree, woodland and
forestry-related issues and promote community ownership involvement in
community woodlands. 
b) Outdoor Access 
The right to take responsible non-motorised access in Scotland is provided
by the Land Reform (Scotland) Act 2003.  The Scottish Outdoor Access
Code explains what is meant by responsible access in many situations for
both the 'access taker' and the 'land manager'.
Public access should be considered in the preliminary stages of forestry
and woodland proposals and should not be unduly restricted by forestry
operations. The Core Paths Plan is available on the PKC website and Rights
of Ways are on the Scotways website.
If present, proposal plans and maps should include Core Paths and Rights
of Way. If a temporary diversion of a core path or right of way is required
to facilitate works, the PKC Community Greenspace Team should be
contacted via OutdoorAccess@pkc.gov.uk  
PRIORITY 4: FORESTS, WOODLANDS AND PEOPLE
Maximising the role of forests and woodlands to improve the
quality of life of residents of Perth and Kinross
• Contributing Theme 8: Access for Health and Wellbeing
Page 147 of 254

Page 148

42
Draft FWS July 2026
Communities should be forewarned of proposed tree, woodland and
forestry proposals likely to impact their local surroundings. Contacting the
Perth and Kinross Outdoor Access Forum, representative bodies such
as The British Horse Society and local community groups is encouraged.
Perth and Kinross Council will support the development of active travel
routes through new and existing woodland (where appropriate) to
increase access and encourage participation in woodland activities. All
developments must protect and enhance trees, woodlands and forestry
(see section 5.9 a).
PKC Policy Guidance 
1. Proposals that aid communities to access their local parks and
woodlands and encourage participation in woodland activities
will be supported. 
2. Proposals that encourage use of woodland through creation of
active travel routes, where they do not conflict with other policy
guidance, will be supported. 
3.  Outdoor access should be encouraged via the development of
new active travel routes through new and existing woodland
where appropriate. 
4. All forestry and woodland proposals should include
communication and engagement, so communities are
forewarned of proposed tree, woodland and forestry operations
likely to impact their local surroundings. 
Page 148 of 254

Page 149

43
Draft FWS July 2026
5.8 Integration with Other Land Uses 
Forestry in Scotland for the last century or more has tended to be practiced
in isolation from other land uses, rather than being integrated as in most
other parts of the world. For much of the twentieth century, the norm was
for rural land to be used for single purposes: farming or forestry or nature
conservation. More recently diverse objectives and activities have
increasingly been required from the same areas of land and multifunctional
use is central to Scotland’s Land Use Strategy. 
a) Multiple Benefits through Greater Land Use Integration
This Strategy supports a holistic vision where trees, woodland and forestry
form a landscape matrix aligns with policies to develop connected nature
networks and offers opportunities to re-integrate woodlands into the
landscape. This will enable forestry to play an increasingly multi-functional
role in delivering valuable benefits such as carbon sequestration,
biodiversity, flood protection, recreation and health benefits. 
b) Agroforestry
Agroforestry is the integration of agriculture and forestry at a field scale.
Woodland creation and management can be complementary to farming
when designed to deliver shared outcomes where trees are used to
provide shade, shelter, improved soil and water health, and support
diversified rural incomes. Agroforestry and the planting of field margins,
riparian buffers and shelterbelts can enhance productivity, resilience, and
biodiversity. Woodland grazing systems (e.g. silvopasture) where
appropriate can balance livestock management with habitat and soil health
goals. Advice is available from the Tree Council Agroforestry guide - The
Tree Council
Enhancing existing and creating new riparian woodlands on farmland can
create nutrient and sediment buffer zones, and to help ensure that
watercourses on farms and crofts are in good ecological condition (see
section 5.1 d). 
PKC will support rural diversification and promote a diverse range of
forest-based enterprises by working with landowners, communities and
stakeholders to promote whole-landscape approaches that integrate
woodland creation with farming, biodiversity, water management and
cultural heritage. PKC will continue to raise awareness to explain the many
functions that woodlands and forestry have beyond the trees themselves
and support agriculture where funding becomes available. 
c) Blue Green Infrastructure (BGI)
Blue-green infrastructure is a strategically planned network of natural and
semi-natural areas integrated into the built environment to deliver
multiple environmental and social benefits. The name emphasizes its dual
function: “blue” refers to managing water resources, including stormwater,
rivers, and ponds, while “green” refers to the vegetation, soil, and
greenspaces. NPF4 Policy 20b requires developments to incorporate new
or enhanced BGI. 
PRIORITY 4: FORESTS, WOODLANDS AND PEOPLE
Maximising the role of forests and woodlands to improve the
quality of life of residents of Perth and Kinross
• Contributing Theme 9: Integration with Other Land Uses
Page 149 of 254

Page 150

44
Draft FWS July 2026
The Perth and Kinross Local Development Plan 3 (LDP3) will seek to
identify and protect existing blue and green infrastructure (BGI) assets and
consider where resources can be expanded, enhanced and better
connected, including to new or existing forests and woodlands to achieve
the objectives of NPF4 Policy 1: Tackling the Climate and Nature Crises.
The approach will be guided by the Council's Open Space Strategy which
incorporates insights from the Council’s Climate Change Risks and
Opportunities Assessment to identify projected changes and future needs
of places. This ensures that proposals are designed to be multi-functional
and contribute to the objectives of NPF4 Policy 2: Climate Change
Mitigation and Adaptation. This includes mitigating climate change through
carbon sequestration and the promotion of active travel, as well as
adaptation to projected impacts such as through urban cooling and surface
water management.
d) Trees and Woodland in Planning and Development 
NPF4 aims to create sustainable, liveable and productive places and trees
can deliver all these. NPF4 Policy 6 aims to protect and expand forests,
woodland and trees by ensuring existing woodlands and trees are
protected, cover is expanded and woodland and trees on development
sites are sustainably managed. This FWS is a material consideration to the
PKC planning process. 
Trees, woodland and forestry are opportunities in development and can
add asset value for years to come. Early engagement with an Ecologist and
Arboricultural Consultant is encouraged to ensure trees inform the layout
allowing more to be retained and incorporated into plans. 
Existing woodland, trees and hedgerows should be protected, restored and
expanded to connect to other habitats. The mitigation hierarchy of avoid,
reduce and compensate should be followed to reduce impacts of
development to woodland, trees and biodiversity.
Clearing proposed sites pre-emptively prior to applying for planning
permission has increased over the last decade and is against NPF4 Policies.
Any clearance of trees and woodland on development sites should only
begin when planning permission has been granted and all relevant pre-
commencement conditions have been discharged.
Two documents turn ‘retain the trees’ from an aspiration into a buildable
specification:
1. The Tree Protection Plan provides a picture of the development
proposed onsite, identifies the Construction Exclusion Zone, and
provides details of protection measures to be secured.
2. The Arboricultural Method Statement sets out the methodology for
construction of the development considering the protection of
trees and woodlands through clear sequential steps. 
During construction, trees should be protected in accordance with BS:
5837 2012 Trees in Relation to Design, Demolition and Construction and
the manual for managing trees on development sites. Employing an
Ecological Clerk of Works (ECOW) and ArbCOW to audit and advise is
encouraged. 
Utilities routes should be informed by root protection and constraints
mapping. Utilisation of shared service space and existing road corridors to
co-ordinate utilities, reduce excavation and support efficient construction
is encouraged. Planting trees and woodland as key green infrastructure
Page 150 of 254

Page 151

45
Draft FWS July 2026
features for any future land development for settlement extension, for
new housing development, or both is encouraged.  Landowners and
developers are encouraged to take proactive steps to deliver and
implement woodland strategies as part of long-term master planning for
sites and assets. 
Compensatory Planting 
Newly planted trees can take 20-30 years to replace the habitat lost
depending on species and type. Therefore, protection of existing trees,
hedgerows and woodland that are healthy and structurally sound is
prioritised. 
Where tree loss is unavoidable, compensatory tree planting is required on
a ratio of 1:3 for every tree loss as outlined in the PKC Planning for Nature
Supplementary Guidance.
Compensatory planting should use native trees, recognise site
characteristics, be compatible with existing trees and woodland, and the
proposed development, and seek to bring amenity and biodiversity
enhancements to the site. Guidance on species selection is provided in the
Open Space Supplementary Guidance.
Landscaping plans should include, species selection, stock size, stock type,
planting density, plant protection measures, planting preparation, and a
proposed maintenance schedule to ensure successful establishment of
new planting. Adequate after-care, maintenance and monitoring are
essential especially ensuring young trees are kept weed free. Proposals
should be in accordance with BS: 8545 Trees from Nursery to
Independence. 
e) Food Growing 
The PKC Food Growing Strategy encourages people to grow food locally
including on Council owned and managed land.  The Council supports
planting and management of fruit trees or small orchards in suitable
locations where community groups have shown interest and are able to
maintain them. PKC will continue to require large housing developments to
plant community orchards for the benefit of people and nature and to
provide locally grown fruit.
f) Renewable Energy
Renewable energy has an important role to play in helping to achieve the
Scottish Government target of net zero greenhouse gas emissions by 2045. 
Potential exists for the creation of renewable energy developments, such
as wind and hydro schemes, in appropriate locations across the Perth and
Kinross area.  Advice is provided in the Council’s Draft Renewable and Low
Carbon Energy Planning Guidance (2025). 
Forestry can help to mitigate climate change through the production of
woodfuels, which when used close to source, can be almost carbon
neutral. The main systems used are short rotation coppice and short
rotation forestry. Both offer a range of broader biodiversity benefits. PKC
will continue to encourage use of coppicing as an ancient form of
woodland management in existing and newly created forests and
woodlands. 
Page 151 of 254

Page 152

46
Draft FWS July 2026
PKC Policy Guidance
1. Proposals to diversify and integrate trees, woodland and forestry
with farming, biodiversity, water management and cultural
heritage will be supported.
2. Existing woodland, trees and hedgerows should be protected,
restored and expanded to connect to other habitats. The
mitigation hierarchy of avoid, reduce and compensate should be
followed to reduce impacts of development to woodland, trees
and biodiversity.
3. Clearance of development sites should only begin when
construction of the approved proposal is about to commence.
4. Development proposals should be informed by early engagement
with an Ecologist and competent Arboricultural Consultant
ideally one year in advance to avoid all ecological constraints and
collect robust and comprehensive information.
5. During construction trees should be protected in accordance
with BS: 5837 2012 Trees in Relation to Design, Demolition and
Construction and the manual for managing trees on development
sites.
6. Where tree loss is unavoidable, compensatory tree planting is
required on a ratio of 1:3 for every tree loss as outlined in the
PKC Planning for Nature Supplementary Guidance Planning
Guidance - Planning & Biodiversity - Perth & Kinross Council
(pkc.gov.uk) 
Page 152 of 254

Page 153

47
Draft FWS July 2026
5.9 Identifying Preferred and Potential Areas for New
Woodland Creation
a) Identifying Areas Suitable for Woodland Creation
While it is important to protect and restore existing woodlands, it is also
necessary to identify locations which might be suitable for woodland
expansion. The guidance provided in this Strategy will help inform
decisions about the locations of new woodland. Guiding forestry towards
appropriate locations minimises the likelihood of undesirable
environmental and social outcomes.
Perth and Kinross have been assessed using various datasets (Table 2) and
maps used to identify areas according to how easily they could
accommodate new woodland. These are categorised as ‘preferred’,
‘potential’, and ‘sensitive’ and definitions are provided in Table 1.  
Maps are strategic and case-by-case surveys and analysis will continue to
determine whether proposals are appropriate. The analysis provides a
starting point for the identification of the potential to accommodate
woodland planting of different types.  It is likely that some areas identified
as being suitable for softwood forest for timber production, for example,
could be equally suitable for the development of native woodlands or the
creation of new habitat network links. Diverse forests will be more resilient
and provide a wider range of multiple benefits and are to be encouraged
as part of the ‘Perthshire’ forestry tradition. 
Table 1: Descriptions for land types used in strategic maps
Land Type Description
Existing The current woodland resource identified in the
National Forest Inventory.
Preferred Land with the greatest scope to accommodate the
expansion of a range of woodland types and so
deliver a wider range of benefits. Preferred areas
are likely to have fewer considerations to address.
Potential Land with considerable potential to accommodate
future creation of a range of woodland types but
with at least one significant consideration to
address.  The extent to which these can be
addressed at the design stage will determine if a
woodland creation proposal can be
accommodated.
Sensitive Land with limited scope to accommodate further
woodland creation because of a combination of
considerations.  Limited expansion might be
possible in these areas but only if it is of a scale
and character that can be accommodated without
significant negative impacts on those
considerations and/or where it would positively
enhance features of local interest.
Unsuitable Land which is considered unsuitable for woodland
creation.   
PRIORITY 5: EXPANDING OUR FOREST AND WOODLAND
RESOURCE
• Contributing Theme 10: Identifying Preferred and Potential Areas for
New Woodland Creation
Page 153 of 254

Page 154

48
Draft FWS July 2026
Map 4: Draft Perth and Kinross FWS Indicative ‘Existing’ and ‘Preferred’ Areas
Page 154 of 254

Page 155

49
Draft FWS July 2026
Map 5: Draft Perth and Kinross FWS Indicative ‘Potential’ Area 
Page 155 of 254

Page 156

50
Draft FWS July 2026
Map 6: Draft Perth and Kinross FWS Indicative ‘Sensitive’ and ‘Unsuitable’ Areas
Page 156 of 254

Page 157

51
Draft FWS July 2026
b) Cross Boundary Opportunities 
Catchments, ecological networks and land use pressures extend well
beyond administrative boundaries. A coordinated, cross-boundary
approach to woodland creation and management is therefore essential to
maximise environmental, social and economic benefits. 
A key opportunity lies in aligning delivery with the ambitions of Climate
Ready Tayside, which promotes a catchment-scale approach to climate
adaptation and nature-based solutions. Within this framework, woodland
expansion can play a critical role in addressing shared regional challenges,
particularly flood risk, water quality, biodiversity loss and carbon
sequestration. Collaborative planning with neighbouring local authorities,
regional partnerships, SEPA, Scottish Forestry and delivery organisations
will ensure woodland interventions are targeted where they deliver the
greatest cumulative impact. There is strong potential for cross-boundary
woodland creation for natural flood management. 
Catchments such as the Tay, Earn, Isla and their tributaries traverse
multiple jurisdictions, requiring coordinated upstream and downstream
action. Woodland establishment in upper and mid-catchments - through
riparian planting, floodplain woodland creation and targeted shelterbelt
design - can help to slow water flow, increase infiltration, stabilise soils and
reduce peak flows across administrative boundaries. Cross-boundary
collaboration can strengthen woodland corridors linking high-value
habitats, including connections to Cairngorms National Park, Angus glens,
and Fife lowlands. This will support species movement and resilience in
response to climate change, consistent with Nature Network ambitions. 
Further opportunities include:
• Integrated land use planning, ensuring woodland expansion
complements agricultural activity, peatland restoration and river
basin management across neighbouring areas.
• Shared funding and delivery mechanisms, including joint bids and
coordinated use of funding streams to scale up impact.
• Knowledge exchange and partnership working, to support best
practice in design, community engagement and monitoring. 
Page 157 of 254

Page 158

52
Draft FWS July 2026
Table 2: Data used to inform maps of preferred, potential, sensitive and unsuitable
Preferred Potential Sensitive Unsuitable
• National Forest Inventory
2025
• Land Capability for Forestry
(Categories F1-F3)
• Proposed Woodland of High
Nature Conservation Value
(PKC)
- NWSS: Native woodland
and scrub 
- AWI: Ancient woodland
and ancient semi-natural
woodland, including
Plantations on Ancient
Woodland Sites (PAWS)
and Long-Established
woodlands of Plantation
Origin (LEPO)
- SAC, SPA, SSSI, Ramsar
Sites, NNR: Woodland that
is integral to the value of
designated or special sites
- NWSS: Wood pasture. 
• Potential Woodland of High
Nature Conservation Value
Expansion Zones (PKC
Proposed WHNCV layer with
50m buffer)
• Floodplains and areas
predicted to be at flood risk
(SEPA Flood Risk and Future
• James Hutton Institute
PKC Carbon
Sequestration Potential
(Gain)
• PKC Proposed Nature
Networks –  
− Woodland Networks
− Riparian Networks
• Prime Agricultural Land
Class 3.2
• NatureScot Mountain
Woodland Restoration
Projects (HabMoS)
• Ramsar
• Special Protection Area
• Special Area of Conservation
• Sites of Special Scientific Interest
• National Nature Reserve
• Local Nature Reserve
• RSPB Important Bird Areas
• Gardens and Designed Landscapes
• Inventory of Historic Battlefields Site
• National Scenic Area
• Local Landscape Area
• Provisional Local Nature Conservation
Sites (Biodiversity and Geodiversity)
• Ancient Tree Inventory Site
• Caledonian Pinewood Inventory Site
• Tree Preservation Order
• Scottish Water Drinking Water
Protected Areas
• Prime Agricultural Land (Classes 2 and
3.1)
• Carbon and Peatland Map 2016:
Nationally Important Carbon Rich
Soils, Deep Peat and Peatland
Habitats
• Wildland Area
• Landscape Character Type –
Summits and Plateaux
• Land Capability for Forestry (LCF)
(Category F7) 
Page 158 of 254

Page 159

53
Draft FWS July 2026
Flood Risk Maps – Medium
Likelihood to Flood (River)
• FGS Target Woodlands for
Riparian Benefits
• Scottish Forestry Woodlands
In and Around Towns (WIAT)
Target Areas
Note: 
There are several overlapping designations/ data layers between the Preferred, Potential, Sensitive and Unsuitable layers; these are:
− Land Capability for Forestry (LCF) categories F1-F3 in the ‘Preferred’ category overlaps with Prime Agricultural Land (Classes 2-3.2) which
are included in the Potential and Sensitive FWS categories. The extent to which specific proposals in potential areas will be permissible will
depend on how well sensitivities can be addressed within the proposals. The design of schemes in such areas will require careful
consideration. 
− The James Hutton Perth and Kinross Carbon Sequestration Potential data spatially mirrors the LCF F1-F3 categories as it was based upon the
previous FWS Preferred and Potential areas. 
− WHNCV and Potential Expansion Zone - several of the designated sites included under the Sensitive FWS category also form part of the
Proposed WHNCV and its Potential Expansion Zone.  As per above, the extent to which specific proposals in potential areas will be
permissible will depend on how well sensitivities can be addressed within the proposals. The design of schemes in such areas will require
careful consideration.
− Where parts of the Sensitive category overlap with the Unsuitable category, these areas have been removed from the Sensitive category to
provide clarity that they are unsuitable for woodland creation. 
− Where parts of the Sensitive category overlap with the Preferred category, these areas have been removed from Sensitive and added to the
Potential category to reflect that there may be potential to accommodate future woodland creation within these areas, but there is at least
one significant consideration present which will need to be addressed through the site specific scheme design. 
Page 159 of 254

Page 160

54
Draft FWS July 2026
7. Indicators of Progress 
The following indicators including PKCs Key Performance Indictors and PKCs annual review with Scottish Forestry will be used to measure progress.
Priorities Contributing
Themes
Indicators of Progress
Forests and
Climate Change –
improving the
resilience of our
forests and
woodlands, and
maximising their
role in addressing
climate change
1. Climate
Change
Mitigation,
Adaptation
and Resilience
PKC Climate Change Action Plan KPIs:
• Perth and Kinross Area-wide territorial greenhouse gas emissions (kt CO2e - Net)
• % Of the total land area and total number of hectares of Perth and Kinross covered by woodland
(including subset breakdown)
• Total area-wide LULUCF greenhouse gas emissions
• Total area-wide LULUCF sequestration carbon dioxide emissions (ktCO2e) 
Other:
• Number of forest management and restoration plans which build in adaptation to climate change and
provide protection from flood risk, and mitigation against the effects of flooding and drought
• Number of FGS grants awarded for ‘Target Woodlands for Riparian Benefits’ proposals/projects
• % change in the areas of land covered by carbon rich, deep peat and priority peatland habitats as a result
of forest and woodland planting in those areas covered by forest management plans
• Area (Ha) of peatland restoration
• Area (Ha) of carbon-rich soils, deep peat and priority peatland habitat lost to forest and woodland
planting (Nationally Important Soils, Classes 1, 2, and 5)
Natural Assets,
Environmental
Quality, and
Biodiversity -
Maximising the
role of forests and
woodlands in
contributing to the
quality of the
environment, and
2. Protect and
enhance the
environmental
quality of our
natural
resources (air,
water, soil)
• Mean annual levels of key air pollutants within Perth and Kinross
• Number of days air quality exceed legislative limits in Perth AQMA
3. Help to
protect,
restore,
PKC Climate Change Action Plan KPIs:
• Amount of land protected for nature within Perth and Kinross council Boundary
• Number of trees planted on Council land and maintained open space
Page 160 of 254

Page 161

55
Draft FWS July 2026
Priorities Contributing
Themes
Indicators of Progress
tackling the global
nature crisis
maintain, and
enhance
biodiversity
across Perth
and Kinross
• % of PKC's Local Biodiversity Action Plan Actions that are on track or completed
• % Of Scottish Pollinator Strategy Actions delivered or on-target 
Other:
• Proportion of protected woodland and forest natural features in favourable condition
• % of Perth and Kinross Nature Network actions delivered
• Area (Ha) of WNHCV sites lost to development
• % of the Perth and Kinross Council Area identified as having ‘At Risk’ soils based on Scotland’s Soil Map 
• % of waterbodies in forested catchments classified as having overall high, good, and bad quality status
• % of groundwater area in forested catchments failing to meet quality standards
• % of waterbodies for which forestry operations or activities have resulted in direct pollution of the water
environment
• % of forest management and restorations plans which include protection for the water environment and
sustainable water use
• Number of Scottish Rural Development Programme (SRDP) grants awarded for water quality management
projects/initiatives
4. Contribute to
and help
improve our
landscapes
and scenery 
5. Help make the
most of our
historic
environment
• % of forest management and restoration plans which provide for the protection and enhancement of the
historic environment
• Area (Ha) of AWI and semi-natural woodland sites lost to development
• Number of key archaeological sites within core woodlands
• Number of forest management plans environmental statements identifying where there are potential
conflicts between proposals and the protection of the historic environment
Forests and the
Economy –
6. Productive
Forests
• % of land area in FWS ‘Preferred’ and ‘Potential’ areas taken up for new planting
• Number and length (Km2) of Agreed Timber Transport Routes within PKC area
Page 161 of 254

Page 162

56
Draft FWS July 2026
Priorities Contributing
Themes
Indicators of Progress
Maximising the
role of forests and
woodlands in
supporting the
economy of Perth
and Kinross
• Number and length (Km2) of Consultation Timber Transport Routes within PKC area
• Number of Strategic Timber Transport Fund funding awarded within Perth and Kinross.
• Number of FGS grants awarded for sustainable creation, production, harvesting and processing, and
infrastructure projects/initiatives
7. Forest-based
Enterprises
and Tourism
• Number of annual visits to forests and woodlands within Perth and Kinross
• Number of forest-based enterprises within Perth and Kinross
• Contribution of woodlands, forests and the forest sector to the economy of Perth and Kinross (GVA and
jobs)
Forests,
Woodlands and
People –
Maximising the
role of forests and
woodlands to
improve the
quality of life of
residents of Perth
and Kinross
8. Access for
Health and
Wellbeing
PKC Climate Change Action Plan KPIs:
• Number of trees planted on Council land and maintained open space 
ScotPHO Health and Wellbeing Indicators
• Area (Ha) of community woodland created and managed under FGS WIAT funding scheme
• % increase in Tree Equity Score for urban areas across Perth and Kinross
• % of vacant and derelict sites reused for tree planting or food growing opportunities 
• % of population who live within 500m or less from at least one area of accessible woodland of no less
than 2Ha in size (Woodland Access Standards)
• % of population who have at least one area of accessible woodland of no less than 20Km in size within
4Km of their home (Woodland Access Standards)
• % of datazones within Perth and Kinross ranked most deprived (SIMD)
• % of datazones within Perth and Kinross ranked most access deprived (SIMD)
9. Integration
with Other
Land Uses
PKC Climate Change KPIs:
• Number of trees planted on Council land and maintained open space 
Other:
• Area (Ha) of woodland created in and around towns, villages and Perth City
• Area (Ha) of community woodland created and managed in and around towns under FGS WIAT funding
scheme
Page 162 of 254

Page 163

57
Draft FWS July 2026
Priorities Contributing
Themes
Indicators of Progress
Expanding our
Forest and
Woodland
Resource
10. Identifying
Preferred and
Potential
Areas for New
Woodland
Creation
• % of land area in FWS ‘Preferred’ and ‘Potential’ areas taken up for new planting
• Area (Ha) of woodland cover in Perth and Kinross
• % area of woodland cover in Perth and Kinross and diversity breakdown
• % change in woodland cover since baseline year (2014 FWS adoption)
• Area (Ha) of new woodland and forest creation
• Area (Ha) of new native woodland and forest creation 
Page 163 of 254

Page 164

58
Draft FWS July 2026
Conclusion
This strategy sets out a clear vision for a resilient, connected, and thriving
network of forests, woodlands, and trees that will deliver lasting
environmental, social, and economic benefits for current and future
generations. The opportunities and policies identified in this Strategy aim
to make requirements clearer for the benefit of all in line with the Scottish
Forestry Strategy’s 50-year vision. It aims to create tree, woodlands and
forests that future Scottish generations will be grateful for -healthy,
resilient, diverse woodlands that contribute to the socio-economic and
environmental wellbeing of the country.    
This Strategy sets out ways in which PKC will protect and restore trees,
woodland and forestry as much as is within our control. Main
opportunities are through the development management and planning
processes, Council owned and managed land and greenspaces and as a
consultee to Scottish Forestry on future forestry and woodland proposals.     
Considering the complex challenges faced, protecting, enhancing, restoring
and connecting our trees, hedgerows, woodlands and forests and
expanding our woodland resource has never been more important. The
priorities and themes reflect these challenges and the many opportunities
presented to deliver well-managed sustainable multi-functional role in
delivering valuable outcomes such as carbon sequestration, biodiversity,
flood protection, recreation and health benefits. 
The successful delivery of this Strategy will depend on strong partnerships
between the Council, landowners, communities, environmental
organisations, businesses, and other stakeholders. Perth and Kinross
Council will continue to be a consultee to Scottish Forestry for long term
forest plans, land management plans, felling permissions and woodland
creation proposals. PKC will also continue to provide advice to applicants
prior to submission to Scottish Forestry as part of the due diligence pre-
application process.  Eary engagement is encouraged with PKC to ensure
comments can be integrated into plans and proposals. A checklist of
information required to accompany a forestry and woodland consultation
request to PKC is provided in Appendix 1.    
The Strategy focuses on a 20-year period (2026-2046) but policy and forest
policy will of course continue to change, and society’s future demands are
also likely to be different. It is therefore proposed that the Strategy will
have a ‘working life’ of 10 years. The indicators of success including PKCs
Key Performance Indictors and PKCs annual review with Scottish Forestry
will be used to measure progress.   
Trees and woodlands are among our most valuable natural assets. This
Forestry and Woodland Strategy establish a long-term framework for
protecting, enhancing, and expanding these assets for the benefit of
communities and nature and to allow people to connect with nature
around them. 
Page 164 of 254

Page 165

59
Draft FWS July 2026
Glossary and Acronyms 
Quick Reference
Woodland An area dominated by trees, often with a more open canopy, allowing more light to reach the ground. Woodlands are
often smaller and can support a rich ground flora.
Forest Generally, a larger area of tree cover, often perceived as having denser tree cover and being managed for timber,
conservation, recreation, or other purposes.
Forestry  Sustainable management of forests and woodlands for people, nature, and the economy.
Productive Forestry  Management of woodlands and forests primarily for the sustainable production of timber and other forest products,
while also delivering environmental and social benefits. 
Ancient Woodland Semi-natural woodland continuously wooded since 1750 or 1860. More unambiguously referred to as ancient semi-
natural woodland. The Ancient Woodland Inventory also includes PAWS and LEPO. “Roy” woodlands are on 1750 but
not 1860 maps but may still retain ancient woodland features.
At Risk Soils Soils at risk from compaction, erosion, leaching and run-off.
Local Biodiversity Action Plan
(LBAP)
Sets out the biodiversity objectives, and actions for biodiversity at a site (Site BAP) or regional (LBAP) level
Biodiversity The variety of life on Earth at all levels (from genes to ecosystems), and the natural patterns that it forms.  It is essential
to the processes which support all life on earth ecosystem services.
Carbon Sequestration A natural or artificial process through which carbon dioxide is removed from the earth’s atmosphere and held in either
a solid or liquid form.
Climate Resilience The ability to prepare for, recover from, and adapt to the impacts of climate change whilst preventing those impacts
from growing worse.
Conservation Area An area of special architectural or historic interest, judged to have special character by virtue of their particular
arrangement of the townscape, the character or appearance of which it is desirable to preserve or enhance.
Ecosystem Services The benefits for people provided by the natural environment.
Forestry Grant Scheme (FGS) Scottish Government initiative that supports woodland creation and sustainable management of existing woodlands,
contributing to environmental, economic, and social benefits such as biodiversity enhancement, climate change
mitigation, and rural development.
Page 165 of 254

Page 166

60
Draft FWS July 2026
Forest Management Plan Provides a template that demonstrates sustainability for smaller woodlands under 100 hectares. 
Flood Risk Management The process of identifying, evaluating, and mitigating the potential effects of flooding on communities, infrastructure,
and natural systems.
Fragmentation Where habitat is divided creating increased edges and creating barriers to wildlife movement.
Geodiversity The variety of rocks, minerals, fossils, landforms, sediments and soils, and the natural processes which form them. 
Green (and Blue) Infrastructure  The network of natural and semi natural areas and features which provide multiple benefits including water based
(blue) features such as SuDS.
Habitat Regulations Appraisal
(HRA)
A legally required appraisal of the effects of a plan or proposal on SACs and SPAs. 
Invasive Non-Native Species
(INNS)
A plant, animal, fungus or microorganism that has been introduced outside its natural range by human activity and
subsequently spreads, causing harm to biodiversity, ecosystems, the economy, human health, or quality of life.
Long established woodland of
plantation origin (LEPO)
A form of ancient woodland from 1750 or 1860 where semi natural woodland characteristics may develop. 
Local Development Plan (LDP) A plan which sets out, for the land in the part of the district it relates to, a spatial strategy; any other such matters as
may be prescribed by the Scottish Ministers, and any other matters which the planning authority consider appropriate
to include.
Local Development Plan (LDP)
Area
Perth and Kinross Council boundary does not include the areas within the Cairngorms and Loch Lomond and the
Trossachs National Park boundaries. 
Long-Term Forest Plans A 20-year strategic management plan to demonstrate sustainable forest management. The plan allows for the
agreement of planned felling and restocking during the life of the plan. It identifies management objectives and allows
for the gradual improvement of the woodland. Woodlands over 100 hectares in size require an approved LTFP to be
eligible for grants within the Forestry Grant Scheme. Woodland under 100 hectares require a Forest Management Plan
instead. 
Lower Impact Silvicultural
Systems (LISS)
Includes group selection, shelterwood or underplanting, small coupe felling, coppice or coppice with standards,
minimum intervention and single tree selection systems.
Nature-based solutions Refer to the use of nature and natural environments to help tackle socio-environmental challenges, providing benefits
to people and nature. In particular, these solutions can help us mitigate and adapt to climate change.
Natural Flood Management
(NFM)
An approach to reducing flood risk by working with natural processes rather than relying solely on engineered
structures such as concrete walls, culverts, or embankments. It aims to slow, store, and filter water across the
landscape so that less water reaches rivers and communities at the same time. 
National Planning Framework 4
(NPF4)
NPF4 is the national spatial strategy for Scotland.  It sets out the Scottish Government’s spatial principles, regional
priorities, national developments, and includes a suite of national planning policy.  NPF4 was adopted in February 2023.
Page 166 of 254

Page 167

61
Draft FWS July 2026
Native Woodland Native Woodlands are woods where the canopy cover is mainly made up of native species i.e., over 50%.
National Nature Reserve (NNR) A statutory national designation applied to sites of national importance for wildlife, habitats, geology or
geomorphology, where nature conservation is the primary land use and which are managed to high standards for
conservation and public benefit. There are no NNRs within Perth and Kinross. 
Nearly Native Nearly Native Woodlands are where native tree species make up between 40% and 50% of the canopy.  These woods
have the potential to be converted into native woodlands through changing their species mix.
Open Ground  In forests and woodlands, refers to land that is not occupied by trees and is maintained as open habitat, either
permanently or temporarily. It can include rides, glades, heathland, grassland, wetlands, ponds, rock outcrops and
powerline corridors.
Open Space Space within and on the edge of settlements comprising green space or civic areas such as squares, marketplaces and
other paved or hard landscaped areas with a civic function. 
Plantations on Ancient Woodland
Sites (PAWS)
PAWS are surveyed in the Native Woodland Survey of Scotland (NWSS), where they are recorded in the Scottish Ancient
Woodland Inventory.  These woodlands seem to have originated as a result of natural regeneration sometime prior to
the mid-19th Century but were later converted to planted woods. These may be able to be restored with appropriate
management. 
Peatland Code A voluntary certification standard for UK peatland projects wishing to market the climate benefits of restoration. It
provides assurances to carbon market buyers that the projects they are investing in are credible and deliverable.
Priority Habitats and Species Protected and non-protected habitats and species as listed in the Tayside LBAP and those on the Scottish Biodiversity
List. 
Scottish Biodiversity List Official list of species and habitats that are of principal importance for biodiversity conservation in Scotland. It is
intended to help public bodies and others prioritise conservation action
Special Area of Conservation
(SAC)
An international designation to protect an area for important habitat and the species it supports.
Special Protection Area (SPA) An international designation to protect an area for its importance for birds. 
Site of Special Scientific Interest
(SSSI)
A national designation to protect an area for its special wildlife, habitats, geology, or landforms. 
Tree Preservation Order (TPO) A TPO is made by the Local Authority, under Section 160 of the Town and Country Planning (Scotland) Act 1997, and
within the procedures set out in the Town and Country Planning (Tree Preservation Order and Trees in Conservation
Areas) (Scotland) Regulations 1975-1984. 
Veteran Tree A tree showing features associated with ageing and ecological maturity that contribute to its high biodiversity, cultural,
historic or landscape value, irrespective of its chronological age. 
Wild Land Areas Semi-natural landscapes with minimal signs of human influence and a strong sense of wildness. 
Page 167 of 254

Page 168

62
Draft FWS July 2026
Woodland Carbon Code Quality assurance standard for woodland carbon projects in the UK which sets out requirements for voluntary
woodland creation projects which tackle climate change by removing carbon dioxide from the atmosphere.
Woodland of High Nature
Conservation Value (WHNCV)
A woodland of high nature conservation value can be described as: native woodland and scrub identified by the Native
Woodland Survey of Scotland (NWSS); ancient woodland and ancient semi-natural woodland, including Plantations on
Ancient Woodland Sites (PAWS) and Long-Established woodlands of Plantation Origin (LEPO); woodland that is integral
to the value of designated or special sites (SACs, SPAs, SSSIs, Ramsar sites, and National Nature Reserves (NNRs)), and
wood pasture.
UK Biodiversity Action Plan Although the UK BAP itself is no longer active, the terms "UK BAP Priority Habitat" and "UK BAP Priority Species" are
still commonly used in ecological surveys, planning applications and biodiversity assessments. 
Page 168 of 254

Page 169

63
Draft FWS July 2026
Appendix 1: Checklists for Woodland and Forestry Proposals 
All Woodland Forestry Management Proposals
 All proposals must adhere to the UK Forestry Standard.
 Early consultation with PKC Woodland Enquiries Team WoodlandEnquiries@pkc.gov.uk 
 Ascertain if proposed is within land categorised as ‘preferred’, ‘potential’, and ‘sensitive’ on PKC map. 
 Proposals protect sensitive catchments in Perth and Kinross in accordance with Supplementary Guidance.
 Proposals within or adjacent to affect designated protected areas developed in consultation with NatureScot and HRA completed if required.
 Proposals informed by ecological surveys to ascertain the presence of and impact to protected species, important habitats and wider biodiversity. 
 Proposals likely to impact on waders accompanied by a survey and impact assessment to waders and their habitats. 
 Proposals within 30m of a watercourse accompanied by an otter survey.
 A detailed soil survey used to avoid and protect areas of deep peat (over 50cm) and avoid Class 1 and 2 soils.  
 Proposals protect, enhance and restore sensitive, open and rare habitats and breeding bird areas of high conservation value.
 Proposals avoid habitat fragmentation by incorporating open glades, rides, transitional habitats, peatland restoration and riparian planting where
appropriate. 
 Proposals likely to impact on traditional orchards are accompanied by a survey, impact assessment and measures to restore and extend the habitat.
 Proposals likely to impact on species rich grassland are accompanied by a survey and impact assessment with measures to restore the habitat by
managing it to maintain a diversity of species.
 Proposals that may impact Wild Land Areas are accompanied by an impact assessment and mitigation measures.
 Proposals covered by a Tree Preservation Order (TPO) or within a Conservation Area are protected and retained.
 Early consultation with the Perth and Kinross Heritage Trust to consider the historic environment.  
 Proposals within Local Landscape Areas must demonstrate they will not have a significant adverse effect on the special qualities.
 Geological and geomorphological elements not obscured by planting.
 Long Term Forest Plans and Forest Management Plans created as a basis for felling permissions.
 Existing woodlands, forests and plantations are restructured to diversify age and species structures and create softer edges, deadwood, areas of open
ground, shrub layer and natural understory.
Page 169 of 254

Page 170

64
Draft FWS July 2026
 Removal of non-native and conifer species along riparian areas and replacing with native species. 
 Proposals contain diverse range of species and avoid reliance on single species and uniform planting create buffer zones, stepping stones and habitat
corridors. 
 Proposals include removal of invasive non-native species and bracken if present onsite.
 Clear felling minimised and seed-bearing native trees retained to ensure some continuous cover forestry.
 Communities are forewarned of proposed tree, woodland and forestry proposals likely to impact their local surroundings. 
 Public access is considered in the preliminary stages of proposals. If present, proposal plans and maps include Core Paths and Rights of Way. If a
temporary diversion of a core path or right of way is required, PKC Community Greenspace Team contacted. 
 Perth and Kinross Outdoor Access Forum and representative bodies such as The British Horse Society contacted.
 Robust deer management, preferable sustainable deer control should be proposed and not rely wholly on deer fencing. Large sites and those adjacent
to protected areas should be accompanied by a Deer Management Plan. 
 Fencing should consider badger gates and measures to avoid bird strike.
 Impact of new tracks, alterations to existing tracks or roads, formation of vehicular accesses may require ‘prior notification’ or an application for
planning permission. 
 Proposals requiring new roads for timber operations should determine the potential impacts of the route and potential runoff of the proposed roads
into watercourses and wetland habitats.
 The agreed timber routes can be viewed on the  interactive map covering Stirling and Tayside TTG. 
 Early engagement with the Roads Maintenance Partnership.
 Cross-boundary opportunities are considered. 
Additional Checklist for Proposals within WHNCV
 Avoid damage, loss, fragmentation and adverse impacts to woodlands of high nature conservation value (WHNCV) by enhancing and connecting. 
 PAWS and LEPO are restored to diversity species, age and structure, retain veteran trees and provide deadwood. 
 Proposals for LEPO contain low impact silviculture systems, long-term retention areas with a diverse species mix and high proportion of native species. 
 Granny pines retained and non-native species from old Caledonian forest replaced with Scots pine.  
 Removal of bracken and invasive non-native species from HHNCV. 
Page 170 of 254

Page 171

65
Draft FWS July 2026  
Additional Checklist for Proposals within Upland Areas
 Proposals seek to protect, enhance and restore sensitive and rare upland habitats informed by NVC and bird breeding surveys.
 Proposals protect, restore and enhance montane woodland and scrub habitats.
 Proposals include a diverse range of native species, gradual transitions of habitats and feathered edge forestry.  
Additional Checklist for Development Proposals 
 Early engagement with an Ecologist and Arboricultural Consultant to ensure trees inform the layout and are retained.
 Existing woodland, trees and hedgerows protected, restored and expanded to connect to other habitats. 
 The mitigation hierarchy of avoid, reduce and compensate followed to reduce impacts of development.
 Trees are not felled pre-emptively prior to applying for planning permission. 
 A Tree Protection Plan and Arboricultural Method Statement submitted.
 During construction, trees should be protected in accordance with BS: 5837 2012 Trees in Relation to Design, Demolition and Construction. Ecological
Clerk of Works (ECOW) and ArbCOW employed to audit and advise. 
 Where tree loss is unavoidable, compensatory tree planting is required on a ratio of 1:3 for every tree lost.
 Compensatory planting uses native trees, recognises site characteristics, is compatible with existing trees and woodland and seeks to deliver amenity
and biodiversity enhancement. Species selection is in accordance with the Open Space Supplementary Guidance.
 Landscaping plans include species selection, stock size, stock type, planting density, plant protection measures, planting preparation, and proposed
maintenance schedule. Adequate after-care, maintenance and monitoring ensure young trees are kept weed free. 
 Proposals in accordance with BS: 8545 Trees from Nursery to Independence. 
 Community orchards provided in major housing sites. 
 Native and berry producing hedgerows are created that connect to existing habitats. 
 Management of and the creation of tree avenues to reflect traditional landscapes in Perth and Kinross. 
 Proposals contain diverse range of species and avoid reliance on single species and uniform planting.
 Proposals create buffer zones, stepping stones and habitat corridors. 
 Tree planting on PKC owned and managed land is in accordance with the PKC Tree Planting Policy and Open Space Strategy. 
Page 171 of 254

Page 172

66
Draft FWS July 2026
Appendix 2: Sites Designated for Natural Heritage within Perth and Kinross Council
Boundary Area 
Special Protection Area (SPA) 
Caenlochan Firth of Tay and Eden Estuary Rannoch Lochs
Cairngorms Massif Forest of Clunie South Tayside Goose Roosts
Drumochter Hills Loch Leven 
Special Area of Conservation (SAC) 
Beinn a' Ghlo Dun Moss and Forest of Alyth Mires Rannoch Moor
Ben Heasgarnich Dunkeld - Blairgowrie Lochs River Tay
Ben Lawers Firth of Tay and Eden Estuary Shelforkie Moss
Black Wood of Rannoch Glenartney Juniper Wood Shingle Islands
Caenlochan Keltneyburn Tulach Hill and Glen Fender Meadows
Craighall Gorge Methven Moss Turflundie Wood
Drumochter Hills Pitkeathly Mires Upper Strathearn Oakwoods 
Sites of Special Scientific Interest (SSSI)
Aldclune and Invervack Meadows Almondbank Ardblair and Myreside Fens
Ballo and Harperleas Reservoirs Ballyoukan Juniper Wood Balnaguard Glen
Beinn a' Chuallaich Beinn a' Ghlo Ben Chonzie
Ben Heasgarnich Ben Lawers Ben Vrackie
Birks of Aberfeldy Bishop Hill Black Loch (Cleish)
Black Wood of Rannoch Blair Atholl Meadow Bog Wood and Meadow
Bolfracks Wood Brerachan Meadows Caenlochan
Cairnleith Moss Cairnwell Cardney Wood
Carey Carie and Cragganester Woods Carn Gorm and Meall Garbh
Carsebreck and Rhynd Lochs Coille Chriche Coire Bhachdaidh
Comrie Woods Connachan Marsh Craig More
Craig Rossie Craig Tronach Craighall Gorge
Page 172 of 254

Page 173

67
Draft FWS July 2026
Sites of Special Scientific Interest (SSSI)
Craigs of Lundie and Ardgarth Loch Croftintygan Meadow Dalcroy Promontory
Den of Airlie Den of Alyth Den of Riechip
Devon Gorge Drummond Lochs Drumochter Hills
Drumore Loch Dun Moss Dunalastair Reservoir
Dupplin Lakes Fearnan Cowpark Fintulich
Forest of Alyth Mires Forest of Clunie Fungarth Juniper Wood
Gartwhinzean Meadow Glas Tulaichean Glen Fender Meadows
Glen Garry Glen Lyon Woods Glen Queich
Glen Tilt Woods Glenartney Juniper Wood Gleneagles Mire
Hare Myre, Monk Myre and Stormont Loch Inchcoonans Claypit Inner Tay Estuary
Keltneyburn Kincardine Castle Wood Kings Myre
Kinnoull Hill Lacesston Muir and Glen Burn Gorge Laird's Loch
Linn of Tummel Little Ballo Little Glenshee
Loch Con Loch Freuchie Meadows Loch Leven
Loch Moraig Loch Tay Marshes Loch Tummel Flush
Lochindores Lochmill Loch Lochs Clunie and Marlee
Lochs of Butterstone, Craiglush and Lowes Logierait Mires Lurg & Dow Lochs
Meall Dail-chealach Meall Ghaordie Meall Reamhar
Meggernie and Croch na Keys Woods Meikleour Area Methven Moss
Methven Woods Mill Dam Milton Wood
Monzie Wood Morenish Meadow Pass of Killiecrankie
Pitarrig Meadow Pitkeathly Mires Pitlowie
Quoigs Meadow Rannoch Lochs Rannoch Moor
Redmyre River Lyon Bank Romadie Wood
Schiehallion Shingle Islands Shochie Burn
Straloch Moraines Struan Wood Tay Bank Section
Thistle Brig Tomnadashan Mine Tulach Hill
Turflundie Wood Weem Meadow Wether Hill 
Page 173 of 254

Page 174

68
Draft FWS July 2026
National Nature Reserve (NNR)
Ben Lawers Loch Leven 
RAMSAR Sites
Firth of Tay and Eden Estuary Rannoch Moor
Loch Leven South Tayside Goose Roosts 
Page 174 of 254

Page 175

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure 
Date of Meeting: 26 August 2026 
Report Title: Perth and Kinross Open Space Strategy Draft 
Report Number: 26/223 
Report Author: Dante Sosa, Planning Officer, Development Plans
Team 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 The report presents the draft of the first Perth and Kinross Open Space
Strategy (OSS) which will provide a strategic framework for the Council’s
policies and proposals for the development, maintenance and use of green
infrastructure, including open spaces and blue-green networks. 
1.2 The purpose of the OSS is to: 
• Set out the Council’s quantity, quality and accessibility open space
standards.
• Present the findings of the open space audit benchmarked against those
standards, identifying areas where new or enhanced provision is required.
• Identify areas of public open space to be safeguarded from development
in the Local Development Plan 3 (LDP3).
• Inform Development Management planning application decisions which
will include proposals relating to designated open space or where new
open space provision is required.
• Help embed blue-green infrastructure principles into future development.
• Provide an evidence-base for external funding applications.
• Support the delivery of wider policy objectives. 
1.3 This first OSS for Perth and Kinross is prepared in fulfilment of the updated
requirements under the Planning (Scotland) Act 2019 and National Planning
Framework 4 (NPF4). 
1.4 The report seeks approval to proceed to public and key stakeholder
consultation and engagement. 
9
Page 175 of 254

Page 176

1.5 Sections 
1. Purpose
2.  Recommendations
3. Background / Main Issues
4. Conclusions
5. Impact and Value Assessment
6. Appendices 
2.  Recommendations 
2.1 It is recommended that the Committee: 
• Agree the Vision statement set out in the Open Space Strategy.
• Approve the draft Open Space Strategy in Appendix 1 to proceed to public
and key stakeholder consultation and engagement. 
3. Background / Main Issues 
Context 
3.1 Open space plays a key role in supporting the environmental, social and
economic wellbeing of settlements across Perth and Kinross. Parks, green
corridors, sports pitches, natural spaces and civic spaces contribute towards
public health, biodiversity, climate resilience and sustainable placemaking.
They also support active travel, community cohesion and the attractiveness of
settlements as places to live, work and invest. 
3.2 Figure 1 illustrates the broad components covered by the OSS. While “open
space” has a specific definition in planning policy, for the purposes of this
strategy the term is used as an overarching concept encompassing open
spaces, green spaces, green infrastructure, blue infrastructure and the blue-
green networks that connect them. The Strategy therefore adopts a holistic
approach, recognising that the value of open space extends beyond individual
sites to include the wider green and blue assets and connections that support
sustainable, nature-positive and healthy places. 
3.3 New duties on planning authorities to prepare and publish an OSS were
introduced in the Planning (Scotland) Act 2019. It inserted Section 3G Open
Space Strategy into the Town and Country Planning (Scotland) Act 1997.
Section 3G (2) of the Act states “an open space strategy is to set out a
strategic framework of the planning authority’s policies and proposals as to
the development, maintenance and use of green infrastructure in their district,
including open spaces and green networks.”  Section 3G (3) of the Act sets
out an open space strategy must contain: 
(a) an audit of existing open space provision
(b) an assessment of current and future requirements
(c) any other matter which the planning authority considers appropriate.
Page 176 of 254

Page 177

3.4 NPF4 identifies blue-green infrastructure, open space, play, recreation and
sport as essential components of sustainable places. Policies 20 (Blue and
Green Infrastructure) and 21 (Play, Recreation and Sport) require LDPs to
protect, enhance and expand these assets, informed by an evidence-based
OSS. Together, these policies establish the OSS as a key tool for delivering
NPF4 objectives. 
3.5 The preparation of this OSS provides an effective, corporate means to co-
ordinate the policies of the different council services with responsibilities for
development, maintenance and use of green infrastructure. It is a key
evidence base to support the preparation of LDP3 and wider corporate
priorities, including tackling climate change, supporting physical and mental
wellbeing, and enabling our children and young people to achieve their full
potential. 
The Draft Strategy’s Vision and Strategic Outcomes 
3.6 The OSS will form an evidence base for planning decisions by providing
standards, guidance and policy to help ensure that open spaces continue to
meet the needs of communities now and in the future. 
3.7 The vision proposed in the draft OSS is: 
Figure 1: Blue and green network components
Page 177 of 254

Page 178

3.8 “Every community in Perth and Kinross enjoys safe, inclusive and biodiverse
open spaces within easy reach, connected by nature-rich blue-green networks
that support climate resilience, healthier lives and equal opportunities for all
ages.” 
3.9 To deliver this vision, the draft OSS identifies the following six strategic
priorities that are consistent with the national expectations for Open Space
Strategies. 
• Access to quality open space – Open spaces will be planned, designed
and managed to ensure all residents can access good-quality spaces
within their local area.
• Successful, sustainable places – Open spaces will contribute to the
creation of well-designed and sustainable places, supporting placemaking
and local living.
• Health and wellbeing – Open spaces will support physical and mental
health by providing accessible, welcoming and safe environments for
recreation, social interaction and connection to nature.  
• Advancing equality and inclusion – Open spaces will be accessible and
inclusive for all users, helping to reduce inequalities and support diverse
community needs. 
• Nature positive places – Open spaces will protect, enhance and connect
habitats, supporting biodiversity and delivering positive outcomes for
nature. 
• Climate change mitigation and adaptation – Open spaces will function
as nature-based solutions to climate change by reducing emissions and
increasing resilience to climate change impacts. 
Open Space Standards 
3.10 The OSS adopts the Council’s existing standards for the quantity of and
accessibility to open space provision, as set out in the Standards section of
the strategy (page 6). As this was the Council’s first open space audit, a
quality standard was introduced to provide a clear benchmark, with the
expectation that sites assessed would achieve a rating of ‘Good’ or higher. 
The Open Space Audit 
3.11 In accordance with statutory requirements, an audit of existing open space
provision across Perth and Kinross was undertaken to inform the preparation
of the draft OSS. The purpose of the audit is to undertake an assessment of
the quantity, quality and accessibility (i.e. spatial distribution) of existing open
spaces. The Open Space Audit Report (Appendix 2) has been prepared and
provides detailed information on the audit undertaken. The section below
provides key information from the report. 
3.12 The audit considered all open spaces within or adjacent to settlement
boundaries identified in the current Local Development Plan (LDP2) that were
0.2ha or larger, as well as smaller sites considered to be of local importance
(e.g. pocket parks, memorial gardens). This audit considers all open spaces
whether publicly or privately managed sites. For a breakdown of the Council’s
Page 178 of 254

Page 179

greenspace assets please refer to the Community Greenspace Asset
Management Plan (CGAMP). 
Quantity Assessment 
3.13 Each site was visited and initially pre-screened to identify a subset of open
spaces deemed accessible to the public. A summary of the spaces
considered in the audit is provided in the table below. The public open spaces
(POS) where then taken forward to the quantity benchmarking and quality
assessment stage of the audit.   
Table 1: Overview of all open spaces considered in audit
Type No. Sites Total Area
(Ha)
Public open space (POS) 432 906
Open space with limited accessibility or no
public function (e.g. golf courses, allotments,
natural space with no formal access). 480 1,996
Total 912 2,902 
3.14 Although the quantity benchmarking focused on populations residing in
settlements with a boundary identified in LDP2, it is helpful to contextualise
the findings at a wider authority scale. If the total Perth and Kinross population
of 150,953 (Census, 2022) were applied to the quantity standard, the resulting
POS requirement would be approximately 528ha. The audit identified around
906ha of POS, indicating that, at an overall level, open space quantity
comfortably exceeds the benchmark but requires an accessibility analysis as
to whether its distribution is suitable. 
Accessibility Analysis 
3.15 An accessibility analysis was undertaken to assess the distribution of public
open spaces in relation to the population based on the Council’s accessibility
standards. The findings help to identify areas of sufficient provision as well as
locations where accessibility gaps may exist. The table below presents the
outputs of the accessibility analysis across all LDP2 designated settlements. 
Table 2: Percentage households meeting accessibility standards across
LDP2 settlements 
Public Park
(700m)
Playing Field
(1200m)
Local
Equipped
Area for Play
(LEAP)
(400m)
Neighbourhood
Equipped Area
for Play (NEAP)
(1000m)
All Settlements 84% 95% 60% 84% 
Page 179 of 254

Page 180

Quality Assessment 
3.16 A quality assessment was undertaken to evaluate the condition and
characteristics of open spaces identified as publicly accessible in the audit.
The findings identify those spaces that are performing well and provide good
value to communities, as well as those where improvements may be required.
A full description of the quality criteria used in the assessment is provided in
Appendix 2: Open Space Audit Report. 
3.17 Overall, only 2% of the sites assessed failed to meet the overall quality
standard. The table below sets out the number of sites scoring above ‘good’: 
Table 3:Public open space quality assessment summary results
Quality Criterion % sites scoring ‘Good’ or
above
Accessibility 78%
Place Quality 84%
Care and Maintenance 94%
Biodiversity 91%
Community Use 87%
Overall Quality Score 98% 
Overview of Audit Outputs 
3.18 Appendix 3 provides a comprehensive summary of the settlement-level audit
findings and includes a breakdown for neighbourhoods in Perth. This is
supported by a series of spatial datasets developed during the assessment
process available on the Open Space Audit Map. Together, these outputs for
a spatial evidence base to inform planning decisions, including requirements
for on-site and/or off-site contributions. For ease of interpretation, the
following tables summarise the results for LDP2 settlements with populations
exceeding 1,000 residents. The table is colour coded to visualise settlement
performance in the audit with those scoring in the 10th decile shown green, 9th
yellow, 8th orange and those in the 7th or below (<70%) shown red.    
Page 180 of 254

Page 181

Table 4: Open space audit quantity and accessibility summary: LDP2
settlements
Settlement
Population
(Census
2022)
Meets
Quantity
Standard
Quantity
Shortfall
(Ha)
% Households meeting accessibility
standard
Public
Park
(700m)
Playing
Field
(1200m)
LEAP
(400m)
NEAP
(1000m)
Perth 49,292 Yes  89% 99% 62% 88%
Blairgowrie 9,433 No -3.5 75% 98% 58% 70%
Kinross and
Milnathort 7,606 Yes  82% 100% 69% 91%
Crieff 7,142 Yes  95% 99% 52% 89%
Auchterarder 6,061 Yes  59% 91% 62% 74%
Scone 5,232 Yes  87% 100% 43% 84%
Bridge of Earn 2,918 No -2.1 100% 100% 63% 76%
Pitlochry 2,694 Yes  87% 97% 59% 85%
Alyth 2,345 Yes  96% 99% 67% 95%
Coupar Angus 2,132 Yes  90% 99% 80% 65%
Invergowrie 1,969 Yes  88% 96% 55% 88%
Aberfeldy 1,886 Yes  94% 100% 84% 91%
Comrie 1,847 Yes  79% 98% 42% 87%
Inchture 1,565 Yes  100% 100% 55% 100%
Luncarty 1,514 Yes  94% 99% 41% 98%
Errol 1,500 Yes  100% 100% 70% 100%
Stanley 1,497 No -4 83% 95% 71% 96%
Abernethy 1,425 No -1.3 86% 96% 49% 92%
Methven 1,301 Yes  91% 100% 48% 100%
Bankfoot 1,254 Yes  88% 98% 73% 98%
Dunkeld and Birnam 1,194 Yes  97% 94% 72% 96%
St Madoes and
Glencarse 1,096 Yes  92% 100% 90% 97%
Longforgan 1,079 No -1.9 57% 100% 24% 80% 
3.19 It is important to recognise that a range of factors contribute to identified
shortfalls in POS provision in certain settlements: 
• Historic development of the settlement that did not prioritise open space
provision. This is particularly evident in Perth.
• The presence of spaces that could not be classified as POS in the audit
due to accessibility constraints or lack of clear public function.
• Standard open space typologies do not account for the recreational value
of accessible countryside, which may lessen demand for formal provision
in smaller rural communities.
• The phased delivery of larger public open spaces in new developments
can result in temporary shortfalls following housing occupation. 
Engagement to Date 
3.20 The open space audit provides a quantitative assessment of provision across
Perth and Kinross. However, it is important to consider the audit findings
alongside the lived experience of communities as well as the operational
knowledge of Council services. Internal and external engagement activities
Page 181 of 254

Page 182

were undertaken in parallel with the audit to provide additional context,
identify local priorities, and help validate the findings. 
3.21 An internal Open Space Strategy Working Group has been established,
comprising of officers from Planning and Community Greenspace teams. This
group has provided ongoing input and oversight, helping to shape the
direction of the Strategy and ensuring alignment with wider policy, service
priorities and operational considerations. 
3.22 Wider community views have been captured through a programme of Place
Standard engagement in 2023 undertaken as part of LDP3’s Evidence Report
process. The ‘Big Place Conversation’ gathered feedback from communities
across the area on the quality of their local places, including the availability,
accessibility and quality of open space. The findings have provided a valuable
evidence base in identifying key issues, priorities and spatial inequalities. 
3.23 Focused engagement was undertaken though an Open Space Survey (2025),
which invited feedback from residents on their use and experiences of local
open spaces. This received 212 responses and helped to identify patterns of
use, levels of satisfaction and areas for improvement. The survey found
residents are frequent users of open spaces, with 85% visiting at least several
times per week. Parks, public gardens and natural greenspaces are the most
valued and frequently used assets. Despite high usage, only 44% of
respondents are satisfied with local provision while 32% are dissatisfied,
indicating scope for improvement. A summary report is provided in Appendix
4. 
Figure 2: Overall satisfaction with local open space provision (no. respondents) 
3.24 In addition, a Playing Out in Perth and Kinross Survey (2023) gathered the
views of children and young people, providing important insight into play
provision which has informed the assessment of play sufficiency across the
area. A summary of the feedback received is available in the Draft Play
Sufficiency Assessment. 
3.25 Together, these engagement activities have informed the development of the
Strategy’s priorities and outcomes, ensuring they reflect the needs,
preferences and experiences of both communities and stakeholders.
Engagement outputs, along with priorities identified in Community Action
Plans and Local Place Plans, will be used alongside the open space audit
findings to provide an evidence base for site requirements and settlement
strategies in the forthcoming LDP3.
Page 182 of 254

Page 183

Next stage of consultation 
3.26 Subject to Committee approval, the OSS will be issued for public consultation.
The consultation will provide residents, community organisations, developers,
key agencies and other stakeholders with an opportunity to comment on the
proposed strategy and policies. There will be opportunity to comment on the
sites included in the open space audit to ensure all public open space has
been included. Feedback received during the consultation will be reviewed
and used to inform any necessary amendments to the OSS. A finalised
version of the strategy, together with a summary of consultation responses
and proposed changes, will then be presented to Committee for consideration
and adoption. 
4. Conclusions 
4.1 The draft OSS responds to both existing provision and the changing needs of
communities. This includes recommendations on how to address deficiencies
in existing provision while ensuring future provision is sustainably planned,
delivered and managed. 
4.2 The draft OSS establishes the evidence base, strategic framework and
priorities that will inform the preparation of LDP3. Current and future
requirements will be addressed, where feasible, through LDP3’s policies,
settlement strategies and site-specific developer requirements. It is important
to note that addressing shortfalls in provision is unlikely to be achieved solely
through contributions from new development, as these must be proportionate
to the scale of development. However, opportunities will be identified through
LDP3, and, where opportunity permits, the Council will seek to secure
external funding to address gaps. 
Current Requirements and Deficiencies 
4.3 The evidence base gathered through the open space audit and engagement
activities highlights a number of requirements for the existing open space
network. Key requirements addressed are to: 
• Designate and safeguard existing open space provision, including 70
hectares of undesignated POS identified through the audit.
• Enhance the quality, accessibility and functionality of POS to support a
wider range of recreational, sporting, play, social and environmental
functions for all user groups.
• Expand active travel opportunities across green networks, ensuring
communities have access to green corridors that facilitate walking,
wheeling and cycling through settlements and into the wider countryside.
• Strengthen management and maintenance arrangements, particularly in
the context of resource constraints and ageing infrastructure.
• Support collaborative management approaches with communities and
secure funding to deliver local priority actions and projects. 
4.4 Addressing identified deficiencies remains a key priority and where they have
been identified the following approaches will be pursued:
Page 183 of 254

Page 184

• Safeguard existing POS provision.
• Secure appropriate on-site and off-site developer contributions.
• Pursue external funding opportunities using the OSS as an evidence-base.
• Apply the Infrastructure First principle to ensure POS in new developments
are delivered at the earliest practical stage, taking account of other
infrastructure requirements and any masterplanning of the site.
• Review sites identified in the audit that were not classified as POS, and,
where appropriate, improve accessibility and functionality to make them
public spaces.
• Prioritise quality enhancements to existing open spaces, and path
networks, in areas where new provision is not feasible.
• Regarding the provision of new play spaces or sport facilities, deficiencies
identified in the audit will be addressed following the approaches set out in
the Playground Strategy and Policy on Provision of Facilities for Outdoor
Pitch Sports. 
Future Requirements 
4.5 Looking ahead, the Strategy also plan for future growth, climate challenges
and evolving community needs. Key requirements addressed are to: 
• Integrate good-quality, multifunctional blue-green networks into new
development, ensuring open space standards are met.
• Support local living by ensuring active travel opportunities are integrated
with blue-green networks.
• Deliver nature-positive outcomes through habitat creation, biodiversity
enhancement and connections to nature networks.
• Improve climate resilience through measures such as urban greening,
sustainable drainage (SuDS), shading and flood management measures.
• Ensure the long-term sustainability of open spaces through effective
maintenance arrangements, partnership working and community
involvement. 
5. Impact and Value Assessment 
Draft Open Space Strategy Impact and Value Assessment Form 
6. Appendices 
5.1 Appendix 1 - Draft Open Space Strategy 
5.2 Appendix 2 - Open Space Audit Report 
5.3 Appendix 3 - Open Space Audit Results 
5.4 Appendix 4 - Open Space Survey Summary Report 
Page 184 of 254

Page 185

Page 185 of 254

Page 186

Page 186 of 254

Page 187

Appendix 1 - Perth and Kinross Open Space Strategy 2027-2032
DRAFT
A Perth and Kinross where everyone can live life well,
free from poverty and inequality
9
Page 187 of 254

Page 188

Open Space Strategy 
Contents
Forward ......................................................................................................................................................................... Error! Bookmark not defined.
Introduction ................................................................................................................................................................................................................. 1
Blue and Green Network Overview ............................................................................................................................................................................. 3
Open Space Standards ................................................................................................................................................................................................. 6
Policies and Guidance ................................................................................................................................................... Error! Bookmark not defined.
Current and Future Requirements ................................................................................................................................ Error! Bookmark not defined. 
Page 188 of 254

Page 189

Open Space Strategy
Purpose and Scope
This Open Space Strategy (OSS) sets a strategic framework for how
Perth and Kinross Council (PKC) will protect, enhance and expand
its network of open spaces and wider blue and green infrastructure
(BGI) so that it delivers multiple benefits for people and nature. 
This first OSS for Perth and Kinross has been prepared in fulfilment
of updated requirements under the Planning (Scotland) Act 2019
and National Planning Framework 4 (NPF4). It seeks to ensure that
local action contributes to national priorities.
The purpose of the OSS is to:
 Set out the Council’s quantity, quality and accessibility open
space standards.
 Present the findings of the open space audit benchmarked
against those standards, identifying areas where new or
enhanced provision is required.
 Identify areas of public open space to be safeguarded from
development in the Local Development Plan 3 (LDP3).
 Inform Development Management planning application
decisions which will include proposals relating to designated
open space or where new open space provision is required.
 Help embed blue-green infrastructure principles into future
development.
 Provide an evidence-base for external funding applications.
 Support the delivery of wider policy objectives.
Statutory and policy context
New duties on planning authorities to prepare and publish an OSS
were introduced in the Planning (Scotland) Act 2019. It inserted
section 3G Open Space Strategy into the Town and Country
Planning (Scotland) Act 1997. Section 3G (2) of the Act states “an
open space strategy is to set out a strategic framework of the
planning authority’s policies and proposals as to the development,
maintenance and use of green infrastructure in their district,
including open spaces and green networks.” Section 3G (3) of the
Act sets out an open space strategy must contain:
(a) an audit of existing open space provision
(b) an assessment of current and future requirements
(c) any other matter which the planning authority considers
appropriate.
Introduction
Page 189 of 254

Page 190

Open Space Strategy 
NPF4, adopted 2023, forms part of Scotland’s statutory
Development Plan. It expects planning authorities to use the OSS as
an evidence base during the preparation of LDPs and the
assessment of development proposals.
NPF4, under Policy 20: Blue and green infrastructure, sets out an
expectation for the LDP’s spatial strategy to identify and protect
blue and green infrastructure assets and networks; enhance and
expand existing provision including new blue and/or green
infrastructure. This is to be informed by relevant, up-to-date audits
and strategies, covering the multiple functions and benefits of blue
and green infrastructure.
NPF4, under Policy 21: Play, recreation and sport, sets out an
expectation for LDPs to identify sites for sports, play and outdoor
recreation for people of all ages. This should be based on an
understanding of the needs and demand in the community and
informed by the planning authority’s OSS. These spaces are to be
incorporated as part of enhancing and expanding blue and green
infrastructure.
The OSS was prepared alongside a Play Sufficiency Assessment
(PSA) required by the Town and Country Planning (Play Sufficiency
Assessment) (Scotland) Regulations 2023. The PSA assessed the
quantity, quality and accessibility of formal and informal play
opportunities. Its findings directly inform the open space audit
(OSA) and OSS.
Scope of the Strategy
The OSS sets a five-year framework (2027-2031) with annual
monitoring and a mid-term review, aligned to the Development
Plan Scheme for LDP3 programme and evidence cycles.
The OSS focuses on blue and green infrastructure, including open
spaces and their networks. Figure 1 defines and illustrates the key
components of blue-green networks that are considered within the
scope of the OSS. The OSS considers these components at a range
of scales, from strategic networks (allowing cross boundary issues
to be considered) down to settlement, neighbourhood and
individual sites. To align with the statutory focus, the OSS primarily
considers spaces within and on the edge of settlements. Where
relevant, countryside access and assets are referenced.
Page 190 of 254

Page 191

Open Space Strategy 
Figure 1: Blue-green network components
Page 191 of 254

Page 192

Open Space Strategy 
Vision
Every community in Perth and Kinross enjoys safe, inclusive and
biodiverse open spaces within easy reach, connected by nature-
rich blue-green networks that support climate resilience, healthier
lives and equal opportunities for all ages.
This vision aligns with the principles of BGI:
Multifunctionality – the integration of different land uses and
activities within the same site in order to maximise the benefits to
people and nature and make the most efficient use of land.
Connectivity – the linking together of green areas, features and
spaces to enable people, animals and plants to move between
them.
Strategic Priorities and Outcomes
The OSS adopts priority areas consistent with the national
expectations for Open Space Strategies and localises them for Perth
and Kinross. Each priority is supported by a set of outcomes, as
shown in Table 1. Together, these provide a strategic framework to
guide LDP3 preparation, inform development management
decisions, and help prioritise Council investment and resource
allocation.
As the first OSS for Perth and Kinross, the strategy brings together
and co-ordinates a range of existing policies, strategies and
initiatives that already contribute to the delivery of these priorities
and outcomes. While not entirely new, they provide a centralised
framework through which these existing commitments can be
aligned, co-ordinated and monitored. References to the relevant
supporting strategies, policies and guidance are provided
throughout the OSS. 
Page 192 of 254

Page 193

Open Space Strategy 
Table 1: Strategic Priorities and Outcomes 
Priority Outcomes 
Access to quality open space – Open spaces will be planned,
designed and managed to ensure all residents can access
good-quality spaces within their local area.
Households can access a variety of open spaces within the walking distances
specified in the Council’s accessibility standards.
Open spaces meet the Council’s standards for quality and safety. 
Successful, sustainable places – Open spaces will contribute
to the creation of well-designed and sustainable places,
supporting placemaking and local living.
Blue-green infrastructure and networks form an integral element of design and
placemaking.
Open spaces positively contribute to the character and identity of places.
Blue-green networks support local living, tourism and economic vitality. 
Health and wellbeing – Open spaces will support physical and
mental health by providing accessible, welcoming and safe
environments for recreation, social interaction and
connection to nature.
Blue-green networks provide diverse opportunities for physical activity, play,
recreation and connection with nature.
Open spaces support social interaction, community cohesion and participation. 
Advancing equality and inclusion – Open spaces will be
accessible and inclusive for all users, helping to reduce
inequalities and support diverse community needs.
Open spaces are inclusive and responsive to the needs of people of all age, abilities
and backgrounds.
Open spaces, and their facilities, are co-designed and managed in collaboration
with communities. 
Nature positive places – Open spaces will protect, enhance
and connect habitats, supporting biodiversity and delivering
positive outcomes for nature.
Biodiversity is protected and enhanced across open space networks.
Habitat connectivity is strengthened across settlements and into the countryside. 
Climate change mitigation and adaptation – Open spaces will
function as nature-based solutions to climate change by
reducing emissions and increasing resilience to climate
change impacts.
Blue-green networks support a shift to sustainable travel through improved
walking and cycling connections.
Open spaces contribute to climate resilience through sustainable drainage, flood
management, cooling and shading.
Page 193 of 254

Page 194

Page 194 of 254

Page 195

How the Strategy Was Developed
An internal Open Space Strategy Working Group was established to
provide input and oversight to shape the direction of the strategy,
ensuring alignment with wider policy, service priorities and
operational considerations.
Open Space Audit
In accordance with statutory requirements an audit of existing
open space provision across Perth and Kinross was undertaken to
inform the preparation of the OSS. The purpose of the audit is to
undertake an assessment of the quantity, quality and accessibility
(i.e. spatial distribution) of existing open spaces information on the
audit. 
The audit considered all open spaces within or adjacent to
settlement boundaries identified in the current Local Development
Plan (LDP2) that were 0.2ha or larger, as well as smaller sites
considered to be of local importance. This included sites both
publicly and privately managed to get an overall picture of open
space provision across Perth and Kinross. For a specific breakdown
of the Council’s greenspace assets please refer to the Community
Greenspace Asset Management Plan (CGAMP). 
Further detail on the audit is available in the Appendices: 
 Appendix 1 – Open Space Audit Report
 Appendix 2 – Open Space Audit Results
 Appendix 3 – Open Space Audit Map
Together, these resources provide a spatial evidence base to inform
planning decisions, including the identification of developer
requirements for on and/or off-site contributions.
Engagement
A series of internal and engagement activities were undertaken in
parallel with the OSA to provide additional context, identify local
priorities, and help validate the audit findings. This included a series
of cross-service workshops to co-ordinate internal policies under
the topics covered in the OSS, as well as multiple community
engagement activities to identify current and future requirements,
including:
 Big Place Conversation. A programme Place Standard
engagement for LDP3.
 Playing Out in Perth and Kinross Survey. Online survey
targeted towards children and young people for the PSA.
 Open Space Survey. Online map-based survey to gather
information on valued open spaces and how they are used.
Page 195 of 254

Page 196

Open Space Strategy 
How to Use the Strategy
The OSS is a statutory document and a material consideration in
the decision-making process. It should be used by developers,
Council officers, community groups and other stakeholders to
inform the development, maintenance and use of blue and green
infrastructure, including open spaces and wider networks.
Proposals relating to open spaces should take account of the
policies, standards and spatial analysis set out in this strategy. This
includes consideration of open space quantity, quality, accessibility
and typology, as well identified areas of deficiency and demand.
The OSS should be applied at the earliest stage of development,
including pre-application discussions, and should be used alongside
the LDP and other relevant strategies linked to throughout this
document. Where proposals depart from the standards or
recommendations in this strategy, clear justification will be
required.
In addition, the OSS provides an evidence base that can be used to
support stakeholders and partner organisations to develop, justify
and seek funding for projects that support the delivery of the OSS
priorities and outcomes. 
Page 196 of 254

Page 197

Open Space Strategy
Perth and Kinross is characterised by an extensive and
interconnected blue and green network that forms a defining
element of the area's environment, landscape and sense of place.
Stretching from the Cairngorms in the north to Loch Leven and the
lowland agricultural landscapes in the south, these natural assets
support biodiversity, climate resilience, recreation, active travel,
tourism and community wellbeing. The network comprises rivers,
lochs, wetlands, woodlands, parks, open spaces, habitats and
access routes that connect settlements with the wider natural
environment.
Strategic Blue Network
The River Tay and its tributaries form the backbone of the blue
network across Perth and Kinross. At approximately 193 km in
length, the River Tay is Scotland's longest river and drains a
catchment of more than 5,000 km², making it one of the country's
most significant freshwater systems. The catchment contains
around 162 water bodies, including major rivers and lochs that
support internationally important habitats and species.
Loch Leven is one of Scotland's most important wetland sites and
covers approximately 1,611 hectares. It supports internationally
significant populations of breeding and wintering waterbirds, with
up to 35,000 birds recorded during winter months. The loch is also
a major recreational asset, with the 21 km (13 mile) Loch Leven
Heritage Trail providing opportunities for walking, cycling and
wildlife appreciation.
Key blue network assets include:
 River Tay and the River Tay Special Area of Conservation
(SAC).
 River Earn, River Almond, River Isla, River Tummel, River
Lyon and River Braan.
 Loch Tay, Loch Rannoch, Loch Tummel and Loch Ericht. 
 Loch Leven National Nature Reserve and internationally
important wetland habitat.
 Wetlands, floodplains and freshwater ecosystems
throughout the authority area.
   
Blue and Green Network Overview
Page 197 of 254

Page 198

Open Space Strategy 
Figure 2: Perth and Kinross Blue Network Features
Strategic Green Network
Perth and Kinross contains a diverse green network of woodlands,
habitats, parks, open spaces and protected landscapes. Woodland
is a particularly important asset, covering approximately 99,353
hectares or 19% of the total land area (National Forest Inventory,
2025), contributing significantly to biodiversity, carbon
sequestration and landscape character.
The northern part of the authority lies within the Cairngorms
National Park, the largest National Park in the United Kingdom. The
National Park contains internationally important habitats, extensive
areas of wild land, native woodlands, rivers and mountain
environments, making a substantial contribution to Scotland's
ecological network.
Key green network assets include:
 Cairngorms National Park.
 Loch Lomond and the Trossachs National Park.
 Extensive woodland and forestry estates.
 National Nature Reserves and Local Nature Conservation
Sites.
 Designated Special Protection Areas (SPAs) and Special
Areas of Conservation (SACs).
 Parks, open spaces and green corridors associated with
settlements.
 Core Paths and long-distance recreational routes.  
Page 198 of 254

Page 199

Open Space Strategy 
Figure 3: Perth and Kinross Green Network Features and Connections 
Importance of the Blue and Green Network
Together, these blue and green assets provide a wide range of
ecosystem services and community benefits. They:
 Support nationally and internationally important
biodiversity.
 Help manage flood risk and improve climate resilience.
 Contribute to carbon storage and climate change mitigation.
 Provide opportunities for recreation, active travel and
outdoor learning.
 Support tourism, health and wellbeing.
 Enhance landscape quality and local distinctiveness.
 Improve habitat connectivity across urban and rural areas.
The protection, enhancement and better connection of these
assets is fundamental to creating a resilient, accessible and
multifunctional open space network that continues to support
people, nature and place-making across Perth and Kinross.  
Page 199 of 254

Page 200

Open Space Strategy 
Quantity
The OSA’s quantity assessment identifies the current level of
provision across Perth and Kinross. An initial desk-based review of
existing spatial datasets was used to produce a baseline, this
included all LDP2 designated open spaces. Each site was visited and
pre-screened to identify a subset of spaces deemed to be public
open space (POS). The total area of POS was used to benchmark
against the quantity standard, indicating areas of sufficient
provision or where deficiencies occurred. Table 2 provides an
overview of the spaces considered in the audit.
Table 2: Overview of all open spaces considered in audit
Type No.
Sites
Total Area
(Ha)
Public open space (POS) 432 906
Open space with limited accessibility
or public functions (e.g. golf courses,
allotments, natural space with no
formal access)
480 1,996
Total 912 2,902  
Open Space Standards Quantity Standards:
 Each community should have access to public open space at a rate
of equivalent to 3.5 hectares per 1000 people. 
 The minimum amount of public open space required from new
residential developments is 80m² per dwelling house.
Quantity Policy:
If the quantity of open space within any community falls below 3.5
hectares per 1000 residents, then:
 The Council will support the provision of new public open space
and will seek to identify suitable locations and secure external
funding opportunities to deliver required provision. 
 The sale or development of Council-owned open space that would
result in the loss of these facilities will not be supported unless it
results in replacement provision of equal or greater size within the
community. 
 Development proposals that would result in the loss of open space
will only be supported where:
o replacement provision of equal or greater size and quality is
secured; 
o there is clear evidence of support from the local
community; or 
o material considerations demonstrably outweigh the need
to retain the open space.
Page 200 of 254

Page 201

Open Space Strategy
Accessibility
Although the quantity benchmarking focused on populations
residing in settlements with a boundary identified in LDP2, it is
helpful to contextualise the findings at a wider authority scale. If
the total Perth and Kinross population of 150,953 (Census, 2022)
were applied to the quantity standard, the resulting POS
requirement would be approximately 528ha. The audit identified
around 906ha of POS, indicating that, at an overall level, open
space quantity comfortably exceeds the benchmark but requires an
accessibility analysis as to whether its distribution is suitable. 
An accessibility analysis was undertaken to assess the distribution
of public open spaces in relation to the population based on these
accessibility standards. The findings help to identify areas of
sufficient provision as well as where accessibility gaps may exist.
Table 3 presents a summary of the outputs across all LDP2
designated settlements. 
Table 3: Percentage households meeting accessibility standards
across LDP2 settlements 
Public
Park
(700m)
Playing
Field
(1200m)
LEAP 
(400m)
NEAP 
(1000m)
All
Settlements 84% 95% 60% 84% 
Accessibility Standards:
The accessibility standards are put in place to ensure that everyone is
within a reasonable walking distance to important areas of open
spaces. In Perth and Kinross, everyone should be within:
 700m of a public park
 400m of a Local Equipped Area for Play (LEAP) 
 1000m of a Neighbourhood Equipped Area for Play (NEAP)
 1200m of a playing field
 500m from a core path
Accessibility Policy:
 The Council will seek appropriate developer contributions from
new development proposals in locations outside the defined
accessibility catchments to ensure new residents have access to
adequate provision. 
 The Council will seek to secure additional investment to enhance
open space provision within new developments, beyond the
minimum requirements expected of developers, to address
identified deficiencies in the wider area. 
 The Council will seek to identify suitable locations and secure
external funding to address gaps in provision or connectivity, with
the aim of increasing the proportion of households meeting the
accessibility standards.
Page 201 of 254

Page 202

Open Space Strategy 
Quality
A quality assessment was undertaken to evaluate the condition and
characteristics of open spaces identified as publicly accessible in
the audit. The findings identify those spaces that are performing
well and provide good value to communities, as well as those
where improvements may be required. 
Overall, only ten of the sites assessed failed to meet the required
quality standard. Table 4 sets out the number of sites that scored
less than ‘Good’ for each criterion in the assessment. A full
description of the quality criteria used in the assessment is
provided in the Open Space Audit Report. 
Table 4: Public open space quality assessment summary results
Quality Criterion % sites scoring
‘Good’ or above
Accessibility 78%
Place Quality 84%
Care and Maintenance 94%
Biodiversity 91%
Community Use 87%
Overall Quality Score 98% 
Quality Standards:
Open spaces identified as publicly accessible and included in the audit
are expected to achieve a minimum quality score of 3 (Good) or above in
the Council’s quality assessment. 
Quality Policy:
 Development proposals that enhance the functions of open
spaces and improve the quality of the site will be supported.
 The Council will seek to secure external funding to improve the
quality of open spaces that do not meet the required quality
standard. 
 Where a public open space fails to meet the quality standard and
is privately managed, the Council will take reasonable steps to
work with the responsible parties to bring the site up to the
required standard. 
Page 202 of 254

Page 203

Open Space Strategy
Overview of Audit Findings
A comprehensive set of settlement-level results was produced to
present the audit findings. This is accompanied by a series of
mapped spatial datasets that were developed during the process. 
For clarity and easy of interpretation, the Table 5 present a
summary of the results, focusing specifically on LDP2 settlements
and Perth neighbourhoods with populations exceeding 1,000
residents.
It is important to recognise that a range of factors contribute to
identified shortfalls in POS provision in certain settlements:
 Historic development of the settlement that did not prioritise
open space provision. This is particularly evident in Perth.
 The presence of spaces that could not be classified as POS in
the audit due to accessibility constraints or lack of clear public
function.
 Standard open space typologies do not account for the
recreational value of accessible countryside, which may lessen
demand for formal provision in smaller rural communities.
 The phased delivery of larger public open spaces in new
developments can result in temporary shortfalls following
housing occupation.
Addressing identified deficiencies remains a key priority and where
they have been identified the following approaches will be pursued:
 Safeguard existing POS provision.
 Secure appropriate on-site and off-site developer contributions.
 Pursue external funding opportunities using the OSS as an
evidence-base.
 Apply the Infrastructure First principle to ensure POS in new
developments are delivered at the earliest practical stage, taking
account of other infrastructure requirements and any
masterplanning of the site.
 Review sites identified in the audit that were not classified as POS,
and, where appropriate, improve accessibility and functionality to
make them public spaces.
 Prioritise quality enhancements to existing open spaces, and path
networks, in areas where new provision is not feasible.
 Regarding the provision of new play spaces or sport facilities,
deficiencies identified in the audit will be addressed following the
approaches set out in the Playground Strategy and Policy on
Provision of Facilities for Outdoor Pitch Sports.
Page 203 of 254

Page 204

Page 204 of 254

Page 205

Table 5: Open space audit quantity and accessibility summary: LDP2 settlements
Settlement Population
(Census 2022)
Meets
Quantity
Standard
Quantity
Shortfall
(Ha)
% Households meeting accessibility standard
Public
Park
(700m)
Playing
Field
(1200m)
LEAP
(400m)
NEAP
(1000m)
Perth 49,292 Yes  89% 99% 62% 88%
Blairgowrie 9,433 No -3.5 75% 98% 58% 70%
Kinross and Milnathort 7,606 Yes  82% 100% 69% 91%
Crieff 7,142 Yes  95% 99% 52% 89%
Auchterarder 6,061 Yes  59% 91% 62% 74%
Scone 5,232 Yes  87% 100% 43% 84%
Bridge of Earn 2,918 No -2.1 100% 100% 63% 76%
Pitlochry 2,694 Yes  87% 97% 59% 85%
Alyth 2,345 Yes  96% 99% 67% 95%
Coupar Angus 2,132 Yes  90% 99% 80% 65%
Invergowrie 1,969 Yes  88% 96% 55% 88%
Aberfeldy 1,886 Yes  94% 100% 84% 91%
Comrie 1,847 Yes  79% 98% 42% 87%
Inchture 1,565 Yes  100% 100% 55% 100%
Luncarty 1,514 Yes  94% 99% 41% 98%
Errol 1,500 Yes  100% 100% 70% 100%
Stanley 1,497 No -4 83% 95% 71% 96%
Abernethy 1,425 No -1.3 86% 96% 49% 92%
Methven 1,301 Yes  91% 100% 48% 100%
Bankfoot 1,254 Yes  88% 98% 73% 98%
Dunkeld and Birnam 1,194 Yes  97% 94% 72% 96%
St Madoes and Glencarse 1,096 Yes  92% 100% 90% 97%
Longforgan 1,079 No -1.9 57% 100% 24% 80%
Page 205 of 254

Page 206

Page 206 of 254

Page 207

Planning and Placemaking 
Until LDP3 is adopted, LDP2 and the Council’s Open Space Provision
for New Developments Supplementary Guidance (2021) and Green
and Blue Infrastructure Supplementary Guidance (2020) provide
the operative local detail on on-/off-site provision, developer
contributions and long-term maintenance requirements. This OSS
adds updated spatial priorities and standards to inform decisions
and future guidance under the new planning system.
Development Plans
The LDP’s spatial strategy will identify and protect existing BGI
assets, networks and open space facilities (including play,
recreation, sport and active travel), while also supporting their
enhancement and connectivity through new provision. This will be
informed by an understanding of current and future requirements
identified through the open space audit and community
engagement.
LDP Open Space Designations
A Designated Open Spaces (DOS) dataset will be mapped in the LDP
and identify important areas of ecological, social or landscape value
for protection. Development proposals resulting in the quantitative
or qualitative loss of these areas will not be permitted, except in
circumstances where one or more of the following apply:
a) Where the site is principally used as a recreation resource,
the proposed development is ancillary to the principal use
of the site as a recreational resource.
b) The proposed development involves a minor part of the site
which would not affect its continued use as a recreational or
amenity resource.
c) In the case of proposals involving the loss of a recreational
or play facility, the facility which would be lost would be
replaced by provision of one comparable or greater benefit
and in a location which is convenient for its users, or by the
upgrading of an existing provision to provide a better quality
facility, either within the same site, or at another location
which is convenient for its users.
d) Where a proposal would involve the loss of a sports pitch, a
playing field strategy prepared in consultation with
sportscotland has demonstrated that there is a clear excess
of sports pitches to meet current and anticipated future
demand in the area, and that the site could be developed
without detriment to the overall quality of provision.
Development proposals on designated open space that enhance
the main functions of the site (e.g., play, recreation, sport, habitat
Policies and Guidance
Page 207 of 254

Page 208

Open Space Strategy 
provision) will generally be supported, particularly where they align
with community priorities identified in Community Action Plans or
Local Place Plans.
Open Space Provision for New Developments
All new development should seek to incorporate blue and green
infrastructure of a scale proportionate to the proposal. Where
appropriate, this will include public open space provision. 
Public open space requirements for new development vary
depending on the proposed class, scale and location. Generally,
contributions will be set based on the Council’s quantity, quality
and accessibility standards.
Where there exists good provision of public open space in the local
area that is accessible for new residents, there may be no
requirement for on-site provision but alternatively a financial
contribution towards improvement, accessibility and/or
management of the existing space may be sought. 
Where on-site provision is not feasible or the type of public open
space required (e.g. football pitch) has a wider catchment than the
proposed development, then the Council may request off-site
provision or financial contribution towards upgrading or expanding
existing facilities. 
Open space that counts towards the minimum requirement: 
Any space with a clearly defined play, recreation or sport function which
is accessible and can be used by members of the public. This includes
the following types of spaces:
 High quality SUDS features which are integrated with the wider
public open space provision.
 Larger areas of buffer / screen / street planting where these are
integrated with paths and cycleways. 
Open space that does not count towards the minimum requirement:
 Isolated, grassed areas which have no clear public function.
 Isolated SUDS features which are not integrated with the wider
public open space provision.
 Small areas of street planting. 
 Service strips – unless incorporated with public open spaces.
Page 208 of 254

Page 209

Open Space Strategy
While the OSS does not include quantity standards for non-
residential development (e.g. employment uses, community
facilities), these will be expected to provide BGI where possible.
Requirements for non-residential developments will be determined
on a case-by-case basis, depending on the location, type of use and
the amount of demand it is expected to generate.
Design Standards
The LDP will apply these design standards to site briefs ensuring
developments contribute to sustainable placemaking through high-
quality BGI design. 
Development proposals that include new or enhanced BGI
provision must clearly demonstrate that they respond to the
following design principles:
1. Blue and Green Network Integration
Blue and green networks within the wider area will be identified at
the outset of the design process. New BGI, including public open
spaces, are located strategically to enhance and expand existing
networks, improving connectivity within and beyond the site. 
2. Landscape-led Design
Development proposals respond positively to the landscape
context of the site, with consideration given to important views to,
from and across the site. Existing significant and sensitive features
(e.g. mature trees, hedgerows, water features and paths) have
been identified, protected and incorporated into the site layout and
design.
3. Function and Purpose
Public open spaces will have clear functions within the
development and be of an appropriate size, shape and quality to
fulfil their intended purpose. These will be multifunctional and
provide opportunities for recreation, play and social interaction,
while delivering a range of ecosystem services. The function of all
landscaped areas, including street greening, will be clearly
identified on submitted plans. Small, fragmented or incidental
areas of undeveloped land will not be considered as public open
space and will not contribute to the minimum requirements.
4. Accessibility and Connectivity
Public open spaces will be safe, attractive, inclusive and accessible
to all. They will be designed in accordance with inclusive design
principles and form part of a connected network that is easy to
Page 209 of 254

Page 210

Open Space Strategy 
navigate, supports active travel along nature-rich corridors through
the development and beyond.
5. Identity and Place
Public open spaces will contribute positively to local identity and
sense of place. Public art, landscape features, signage and other
design features should be used to reflect local character and create
distinctive spaces. 
6. Long-Term Management and Maintenance
Proposals incorporating new or enhanced BGI will provide effective
management and maintenance plans covering the funding
arrangements for their long-term delivery and upkeep.
Responsibilities for ongoing maintenance will be clearly identified,
including any areas proposed for adoption by the Council.
7. Planting and Species Selection
Planting schemes reflect the function, character and environmental
conditions of the site. Species selection shall be appropriate to the
location, ground conditions and anticipated climate impacts, and
shall take future maintenance implications into account. Native
species should be used where appropriate as a first principle 
8. Biodiversity Enhancement
The protection and enhancement of biodiversity have been
considered. Opportunities for habitat creation, restoration and
connectivity have been identified within both public open spaces
and private garden grounds (e.g. wildflower meadows, native and
seed-bearing trees, shrubs and hedges, swift & bat bricks and
boxes, dry stone walls, hedgehog highways and wildlife kerbs).
Habitat connectivity should be sought within and beyond the site
connecting, where possible, to wider Nature Networks.
9. Ownership and Responsibility
Private garden grounds, public open space and amenity street
planting will be clearly distinguishable through site design and
boundary treatments. Hedges and small grassed or planted areas
adjacent to properties should, where appropriate, be incorporated
into private garden ground and will not be adopted by the Council.  
Page 210 of 254

Page 211

Open Space Strategy
Submission Checklist
Depending on the scale and nature of the proposed development,
the Planning Authority may request the provision of one or more of
the following alongside the submission of a planning application:
 A site plan which details existing green/blue infrastructure
on the site including connections beyond the site boundary
 A layout plan indicating proposed green areas, green/blue
features and spaces and how these will connect to wider
networks beyond the site boundary 
 A landscape and planting plan detailing the proposed
planting
 Proposals for mitigating adverse impacts on existing BGI
 Arrangements for the ongoing long-term maintenance and
management of new green areas, features and spaces
Where a Landscape Plan is required, the checklist below should be
completed to facilitate the assessment of proposals against Council
standards. 
Page 211 of 254

Page 212

Page 212 of 254

Page 213

Landscape and Planting Plan Checklist:
Where a Landscape and Planting Plan is required, this will include an appropriate level of detail by providing the following information: 
□ Show the location, size, typology and functions of all public open spaces. 
□ POS to be adopted by the Council must be clearly marked and distinguishable from any POS and small areas of amenity open space not to be adopted by
the Council. The number of dwellings to be built and the planning reference must be clearly marked in the title.
□ Illustrate connections to existing blue and green infrastructure, active travel networks (including off road paths) and key destinations within and beyond
the site boundary.
□ Show existing ground levels, gradients and site contours.
□ Show existing site features, including trees, hedgerows, watercourses, paths, structures and other landscape features to be retained or removed.
□ Provide cross-sections of key public open spaces.
□ Provide details of the height and slopes of any proposed mounding or recontouring of the site, with full details of all hard landscaping proposals, including
materials and installation methods.
□ Include specifications for all structures within the site, including bridges, boardwalks, retaining walls, steps, seating, public art and landmark features.
□ Where SuDS are integrated within the public space, plans should distinguish between permanent water/pond, planted wetland and various detention
scenarios for the accessible green space, ideally showing water conveyance flow directions and exceedance flow path.
□ Provide planting schemes, including details of the species, height, size, location, density and maintenance regime of trees and shrubs to be planted.
Existing and proposed vegetation should be clearly distinguished.
□ Show the location, quantity and specification of biodiversity enhancement measures such as bird and bat bricks, wildlife kerbs and hedgehog highways.
□ Provide effective management and maintenance plans covering responsible parties, inspection schedules and long-term funding arrangements for all blue
and green infrastructure.
Further technical guidance on landscaping is provided in the Open Space Provision for New Developments Supplementary Guidance.
Page 213 of 254

Page 214

Page 214 of 254

Page 215

Adoption and Maintenance of Open Space
Development proposals that include new or enhanced BGI, play or
sport facilities will provide effective Management and Maintenance
Plans covering the funding arrangements for their long-term
delivery and upkeep, and the party or parties responsible. 
Management and Maintenance Plans will be agreed prior to the
commencement of work and will usually be set out in planning
conditions. The Council`s Policy on Maintenance Options for Public
Open Spaces in New Residential Developments sets out two
options for the adoption and maintenance of public open spaces:
1. The Council adopts all public open space in new developments.
In this case the flat rate commuted sums will be paid by the
developer with no charge to the residents. Where there is a
planning requirement for exceptionally large public open space
areas, such as a country park, the Council reserves the right to
apply a site-specific commuted sum calculation for these areas.
Areas of amenity planting and small open spaces which do not
benefit the public will not be adopted by the Council. These
areas can be maintained through employing a private factor or
them remaining the resident`s responsibility. 
2. The Council will adopt only Priority Public Open Space (PPOS)
(equipped play areas, large parks, sports pitches and possibly
green corridor path links which are of importance to the wider
community) in all developments to ensure they are available to
the public and that residents are not charged for these
important public spaces. In all cases the Council must adopt
above grounds SUDS (where Section 7 agreement applies) and
they are being jointly maintained with Scottish Water (see
below). For play areas, payment of the flat rate commuted sum
will apply. For the other PPOS areas the flat rate commuted
sum per dwelling will not apply. Instead, a site-specific
commuted sum will be calculated separately, based on current
maintenance rates, and be paid by the developer. For all
remaining POS and amenity areas the developer can apply a
Development Management Scheme (DMS), subject to Council
agreement, with homeowners meeting maintenance costs of
these areas. Land title for the POS areas must be transferred to
the Owners’ Association. 
In both options, developers must transfer land title and pay the
appropriate commuted sums prior to maintenance handover for all
adopted public open space. Payment of a security deposit which is
calculated as a percentage of the commuted sum is also required to
ensure that all public open space meets Council standards prior to
adoption. 
Where there are opportunities for community management such as
allotments, amenity woodland or sports pavilions, this is
Page 215 of 254

Page 216

Open Space Strategy 
encouraged and arrangements with the Council such as a Licence to
Occupy can be applied. 
Please refer to the Council`s Flood Risk Supplementary Guidance
for information on the vesting of SuDS features. Note that site
specific commuted sums may apply.
Private Maintenance Arrangements
Although developers can opt for private arrangements for some
areas, Council adoption of all public open space within a
development is preferred as it is a simpler process. It also has the
benefit that after adoption, developers and residents are relieved
of all future maintenance responsibilities which will be attractive to
all prospective house purchasers. Private maintenance
arrangements will be secured using enforceable robust planning
conditions and obligations.
Commuted Sums
To ensure clarity for developers, the Council`s standard commuted
sum for play areas and public open space are set out in Table 6
below. All figures above are based on the current maintenance
costs for 2026/27 however the commuted sums will be uplifted
annually on 1 April in line with the retail price index (RPI). The
appropriate commuted sums will be applied at the time of
adoption. Full detail is provided in Policy on Maintenance Options
for Public Open Spaces in New Residential Developments 
Table 6: Commuted sums
Public Open Space Area Commuted Sum
Amount (2026/27
figures)
Public Open Space Adoption (in
addition to separate commuted sums
for play areas)
POS £1,122.00 per
dwelling 
Play Area adoption LEAP: £91,886.00
NEAP: £115,025.00
Additional facilities within major
developments (e.g., changing
pavilions, skate parks, allotments)
This will be calculated
on a site-by-site basis  
Page 216 of 254

Page 217

Open Space Strategy
Play
Play is essential for the development of children and young people,
supporting their physical, cognitive, and emotional well-being. It
fosters learning, creativity, and social skills, playing a crucial role in
ensuring a healthy childhood. 
Perth and Kinross Council (PKC) acknowledges that access to play
opportunities is a fundamental right, as outlined in Article 31 of the
UN Convention on the Rights of the Child. Furthermore, recognising
the significant benefits of play, the provision of high-quality play
experiences is a key element in fulfilling the Corporate Plan priority
of enabling our children and young people to reach their full
potential. 
Play Sufficiency Assessment
In accordance with the Town and Country Planning (Play Sufficiency
Assessment) (Scotland) Regulations 2023, a Play Sufficiency
Assessment (PSA) was prepared during the preparation of the
Evidence Report for the Local Development Plan (LDP). The PSA
included statements and maps regarding the quantity, quality and
accessibility of play spaces. This was incorporated into the open
space audit and provides an evidence-base for planning decisions,
including the preparation of the LDP and delivery of National
Planning Framework 4 Policy 21 on Play, Recreation and Sport.
Playspace Standards and Guidelines for Developers
We require developers to provide space for play as an integral part
of the design of a housing development. In creating an estate for all
age groups, designers and planners must consider the pattern of
streets, paths, and open spaces from the child’s viewpoint,
incorporating opportunities for both formal and informal play.
The Council requires all housing developers to make sufficient
provision for play within their development according to standards
set out in the Playground Strategy. A full list of the Council’s play
space standards is available on PKC’s Play Areas webpage. These
standards apply to all new play facilities, whether they are intended
to be adopted or privately managed, and will be enforced using
robust planning conditions and agreements. 
On-site provision or off-site contribution
Developers should liaise with the Community Greenspace service at
an early stage in the design process to identify site requirements.
The Council will provide the developer with an analysis of existing
play provision in the vicinity and the requirements for playspace
within the new development, or whether an off-site contribution is
acceptable.
The indicative threshold that would trigger the development of a
new play facility is reaching approximately 50 residential units
Page 217 of 254

Page 218

Open Space Strategy 
within the settlement. Where smaller developments require a
NEAP/REAP which will largely serve the existing population, the
Council may contribute to its delivery. 
In areas where several developments are being delivered at the
same time, a new play facility may be delivered through shared off-
site contributions and commuted sums between developers.
Developer Contributions and Maintenance Options for Play
The Council will seek to adopt play areas in new developments to
ensure they are available to the public and that residents are not
charged to use these facilities. This is a simpler process and has the
benefit that after adoption, developers and residents are relieved
of all future maintenance responsibilities which will be attractive to
all prospective house purchases. 
The Council’s standard commuted sums (2026/2027) for play areas
are set out below. Commuted sums are calculated to be the
equivalent to annual maintenance over a 20-year period. Where
play areas are adopted, the commuted sum includes a contribution
to the replacement cost within that 20-year period.
 LEAP - £ 91,886.00
 NEAP/REAP - £ 115,025.00 
Figure 4: Positive example of a well-designed play area
Page 218 of 254

Page 219

Open Space Strategy
Physical Activity and Sport
Physical activity and sport play an important role in creating places
where people can live healthy, fulfilling, and productive lives.
The Physical Activity and Sports Strategy 2023-2028 (PASS) sets out
how physical activity and sport will contribute to our Corporate
Priority of supporting and promoting physical and mental
wellbeing.
Our vision for the future of physical activity and sport in Perth and
Kinross is:
We will support everyone’s physical and mental wellbeing
through physical activity and sport.
Through the development of high-quality open spaces and
networks, the OSS supports the delivery of the Council’s vision for
physical activity and sport, and aligns with the strategic priorities of
the PASS:
 We will improve everyone's health in Perth and Kinross
through increased participation in physical activity.
 We will increase the levels of activity for children and young
people, particularly those who currently don't meet the
recommended levels of participation.
 We will reduce the inequalities and barriers which stop
people participating in physical activity and sport.
 We will reduce carbon emissions generated from facilities
and make physical activity part of our Climate Change
response.
 We will support our community-led clubs, sports hubs and
networks to flourish and strengthen collaboration between
all partners in physical activity and sport.
 We will support our community-led clubs and networks to
improve sports pitches and other facilities to promote
participation and inclusivity.
 We will make physical activity and sport part of
Placemaking, so our public spaces are activity-friendly,
inclusive and fun.
Policy on the Provision of Facilities for Outdoor Pitch Sports
The Council’s Policy on Provision of Facilities for Outdoor Pitch
Sports (2017) ensures the effective and efficient management of
Council facilities for outdoor pitch sports for present and future
needs. Community management is encouraged where appropriate;
however, within public parks, the wider public interest must be
assured.
Page 219 of 254

Page 220

Open Space Strategy 
The policy provides the latest information on pitch supply and
demand, but it is recognised that targeted engagement with groups
is required to assess future demand. All sports using outdoor
pitches provided by the Council are considered by the policy,
football and rugby being the most popular, with most of the
Council’s grass pitches in parks used for this purpose. For all sports,
there are adequate pitches to meet current demand, although
quality is variable and new or improved changing facilities are
required in many locations. To maximise use of these facilities, we
encourage clubs to co-ordinate shared use and co-operate over
securing improvements, where required.
The policy identifies a growing demand for the provision of floodlit
synthetic turf pitches (STPs), particularly for training, sports
development and for matches when available and/or when grass is
unplayable.
Sports Provision and New Housing Development
Development Management works with other sections to secure
appropriate new facilities, or contributions for facilities, from major
housing developments. The Fields in Trust quantity standards for
grass provision and sportscotland Facility Planning Model for
synthetic turf pitches (STPs) can be used as a reference for securing
new facilities. New MUGAs, STPs or pavilions (other than at
schools) will be secured according to need and on the basis that
communities will manage and maintain them. In some locations
new pitches with changing facilities may replace existing
substandard facilities. Information from football clubs indicates
that they want to develop new or improved pavilions within at least
nine park pitches. To date, separate outdoor grass and STP facilities
for school and community use have been provided (except at
community campuses). The Council is now seeking ways to ensure
that school and community teams can share facilities, especially
STPs.
Contributions towards sport provision are required on a larger
catchment basis according to the need within the community and
should be a shared facility with schools where appropriate.
Contributions are required more frequently than new provision, but
where there is no provision (or limited poor quality provision)
within the area, new on-site provision may be required from major
developments.
Where sport provision/contributions are likely to be required,
approaching local sport groups and Live Active Leisure’s Sports
Development Team can help inform the developer and authority
about demand for additional facilities or the possibility of
upgrading existing ones. Clearly, the local aspirations must be
balanced with the demand arising from the new development
where the future residents cannot be consulted in advance. 
Page 220 of 254

Page 221

Open Space Strategy
Community Food Growing
The Perth and Kinross Council Food Growing Strategy (2021) (FGS)
sets out to increase the provision of allotments and community
food growing. 
The FGS was written under the legislation of Part 9, Section 119 of
the Community Empowerment (Scotland) Act 2015. It identifies
land in its area that the local authority considers may be used as
allotment sites, identify other areas of land in its area that could be
used by a community for the cultivation of vegetables, fruit, herbs
or flowers, describing how, where the authority is required to take
reasonable steps to increase the provision in its area of allotments
or other areas of land for use by a community for the cultivation of
vegetables, fruit, herbs, flowers and containing such other
information as may be prescribed. 
The main purpose of the FGS is to help ensure that more people
will want to grow their own food and can do so. Our vision is for: 
People across Perth and Kinross to have more opportunities and
be better skilled at growing their own food, thereby leading
healthier, more sociable and sustainable lives. 
The OSS supports the delivery of the FGS’s vision and objectives by:
 Identifying potentially suitable land through the open space
audit.
 Supporting the delivery of new growing spaces through the
development and management of open spaces. 
New Growing Spaces
Local Authorities are required to identify potentially suitable land
for allotments and community growing areas where there is proven
demand. 
The demand for new allotment sites has been identified through
the FGS consultation process and further engagement with
communities with a recognised high demand. The Annual Allotment
Report 2024-2025 identifies high demand that has not yet been
addressed in Crieff and Coupar Angus.
Within New Developments 
The Local Development Plan will seek to identify land within future
development sites for community food growing and allotments,
particularly where there is a proven demand. The Planning
Authority will generally be supportive of development proposals
that include opportunities for community food growing or
allotments, granted appropriate arrangements are provided for
their long-term management and maintenance.
Due to the history of orchards in Perth and Kinross since the
monasteries owned and farmed the Carse of Gowrie in the 12th
century, the Council supports planting and management of fruit
Page 221 of 254

Page 222

Open Space Strategy 
trees or small orchards in suitable locations where community
groups have shown interest and are able to maintain them. PKC will
continue to encourage large housing developments to plant
community orchards for the benefit of people and nature and to
provide locally grown fruit. 
On Council Owned Land 
Repurposing appropriate publicly owned amenity green spaces,
parks and vacant & derelict land is another solution to providing
new growing areas, the latter being supported by those who
responded to the stakeholder survey. Council ground has already
successfully been repurposed for allotments in Letham, Tulloch and
Craigie. Local consultation would be required prior to any sites
being repurposed, particularly with nearby residents. 
The Council’s Open Space Audit identifies public and private open
spaces that may be suitable for the development of food growing
opportunities, although further assessment work would be
required using the site assessment criteria in Appendix 1 of the
Food Growing Strategy.
On Private Land 
Landowners may agree, if approached, to appropriate areas being
used formally, or informally, for community growing. The
temporary use of sites for community growing is supported by the
Council and can allow for flexibility and/or testing project ideas. To
safeguard the security of the project however, it is recommended
that arrangements are formalised with the owner (e.g. through a
lease for an agreed period). Groups should contact the Council at
the outset to confirm that the site is not contaminated and
establish whether planning permission would be required. 
Garden Sharing 
Garden sharing can be initiated by anyone, whether they own a
garden that they cannot maintain, or are looking for a space to
grow fruits and vegetables. Your Community Council may be able to
help you start a local garden sharing scheme. 
Alternatively, you can join Lend and Tend, a UK wide network for
garden sharing. The platform is free to use, and you can sign up by
filling in a simple form. Once you are matched with someone who is
happy to lend their garden, you can meet up to discuss your
expectations and set the ground rules before starting garden
sharing.  
Page 222 of 254

Page 223

Open Space Strategy
Outdoor Access and Active Travel
Perth and Kinross offer many opportunities to get out and enjoy
the outdoors, to walk, cycle, ride or paddle down rivers and camp
overnight. The countryside is also a home and workplace to people
and wildlife, and it is important that we understand our
responsibilities and respect the interests of other people whether
acting as a land manager or as an access taker.
The right to take responsible non-motorised access in Scotland
is provided for by the Land Reform (Scotland) Act 2003 (LRA). The
Scottish Outdoor Access Code (SOAC) has been produced to explain
what is meant by responsible access in many situations for both the
'access taker' and the 'land manager'.
Not all land is within access rights, exceptions include gardens,
school playing fields and growing crops. 
Mobility Strategy
The Council’s Mobility Strategy guides the movement of people and
goods across the area. It sets the strategic direction for the
transport planning, supporting coordinated project delivery and
external funding applications. 
Ensuring development aligns with the standards set out in the OSS
and applies the BGI principles of multifunctionality and connectivity
will support the delivery of the Mobility Strategy’s Transport
Planning Objectives, including:
 Reducing transport-related CO2 emissions by increasing and
improving active travel opportunities.
 Achieving increased active opportunities to and from new
developments.
 Improving safety for all users
 Improving physical and mental health
 Improving air quality 
Core Paths and Rights of Way
The Council maintains a Core Path Plan (2017) as required by the
Land Reform (Scotland) Act 2003 that identifies a system of paths,
2043km in total, which provide reasonable public access to the
outdoors across Perth and Kinross.
The Plan includes paths which are:
 rights of way;
 functional link paths within & between communities
including selected footways (pavements), quiet roads and
promoted cycle routes;
Page 223 of 254

Page 224

Open Space Strategy 
 existing popular and promoted paths;
 upland & forest paths;
 routes to mountains and other points of public interest;
 longer distance routes such as the Cateran Trail;
 routes to access inland water.
Together these routes form integral elements of local and strategic
green networks across Perth and Kinross and beyond. They provide
opportunity for active travel, habitat connectivity and connections
to nature.
Safeguarding Access Rights
The Local Development Plan identifies and safeguards access rights
and core paths, including active travel routes. These should be
incorporated within the design and landscaping of any proposed
development, ideally avoiding the need for any permanent
diversion. If there is any proposal to alter a route of an existing core
path or right of way a further legal procedure is required, and any
proposed diversion should be to as good a standard or a
betterment of the existing route.
The granting of planning permission does not stop the continued
right of public access along the existing core path or right of way.
An order under the Town and Country Planning (Scotland) Act
1997, Section 208 or an amendment of the Core Path Plan under
the Land Reform (Scotland) Act 2003 should be sought. 
If a temporary diversion of a core path or right of way is required to
facilitate works, the PKC Community Greenspace space should be
contacted via OutdoorAccess@pkc.gov.uk. 
Section 208 of the Town and Country Planning (Scotland Act 1997)
provides for the stopping up and diversion of core paths and rights
of way where necessary to enable the development to be carried
out in accordance with planning permission. The process allows a
period of 28 days for any objections or representations to be made
to proposed stopping up and diversion orders.
If you are prevented from exercising your right of responsible
access by an obstruction, such as a locked gate, intimidating sign or
person, you may wish to report the situation for investigation. In
which case you should make a general enquiry report and include:
 an accurate description of the location of the obstruction,
including map-based grid reference if possible
 Date of obstruction, photograph possible and your contact
details
Contacting the Perth and Kinross Outdoor Access
Forum, representative bodies and local community groups is also
encouraged where access rights have been affected.
Page 224 of 254

Page 225

Open Space Strategy
Developing the Path Network
The Planning Authority will generally support proposals that deliver
new, enhanced or improved active travel infrastructure, particularly
where these integrate blue and green infrastructure and nature
rich habitats to a network of green corridors. Design must be
integrated into development proposals and deliver multiple
benefits, including, where appropriate, the provision of informal
and incidental play opportunities. Proposals should expand and
improve access opportunities that link into wider blue and green
networks. 
Proposals for residential development should identify routes to
local schools and include an assessment of the extent to which
these routes provide safe and easy access between the
development and the education facility.
The Local Development Plan will identify proposed routes and seek
opportunities to deliver projects identified in the Active Travel
Prioritisation Delivery Plan. This includes long-distance off-road
shared paths linking settlements that form an integral part of
strategic green networks in the region. 
Figure 5: Open spaces are designed to create green links and are aligned with key
pedestrian routes (by Barton Willmore & Urban Union)
Page 225 of 254

Page 226

Open Space Strategy 
Visitor Destinations and Management
Visitor destinations and visitor management are integral to
supporting a sustainable, high-quality tourism offer across Perth
and Kinross. The area’s natural assets, parks, countryside sites and
path networks play a key role in attracting visitors, supporting the
local economy, and providing a positive experience for both
residents and visitors. 
The OSS supports the ambitions of the Tourism Strategy and Action
Plan 2025-2030 by recognising open spaces as essential tourism
assets and by promoting approaches to visitor access, dispersal and
management that protect environmental quality, enhance place
identity, and ensure that increased visitation is accommodated in a
way that is sustainable, inclusive and beneficial to local
communities. 
Through the development, management and use of the blue and
green networks across Perth and Kinross, the OSS will support the
Tourism Strategy’s vision: 
By 2030, tourism will play a greater role in Perth and Kinross by
supporting an inclusive, international and connected visitor
economy. 
Through cross-sector collaboration and partnership, the OSS seeks
to support the delivery of the Tourism Strategy’s strategic
objectives listed below by providing enhanced opportunities for
year-round, nature-focused tourism. 
Strategic Objectives:
 Area promotion and destination marketing: Aim to drive up
visitation to our area from identified audiences, increasing day
visitors and overnight stays, as well as the length of stay and
visitor spend
 Investment and infrastructure: Aim to attract inward
investment to enhance the visitor experience in the destination,
as well as manage the impact on our communities
 Market development and internationalisation: Aim to build on
investment to date in key assets, developing new tourism
products and visitor experiences
 Industry growth and resilience: Aim to develop a sustainable
visitor economy through supporting businesses to grow,
increase levels of well-paid jobs and build their resilience in a
challenging operating environment
Key assets that attract visitors include our:
 Premier Parks – high-quality destination parks offering
recreation, visitor facilities, and access to nature.
 Countryside Sites – managed natural areas providing
opportunities for outdoor recreation and experiencing the
natural environment.
 Scotland’s Great Trails – Nationally recognised long-distance
routes showcasing Scotland’s landscapes, natural heritage, and
outdoor recreation opportunities. 
 National Cycle Network – the UK-wide network of signed paths
and routes for walking, wheeling, cycling and exploring
outdoors. 
Page 226 of 254

Page 227

Open Space Strategy  
Figure 6: Key visitor destinations
Page 227 of 254

Page 228

Open Space Strategy 
Biodiversity
Perth and Kinross Council has a legal duty to conserve and enhance
biodiversity. Working together across all our services, we are
developing the best ways to do this and, at the same time,
contributing to other policies and initiatives.
Under the Nature Conservation (Scotland) Act 2004, all public
bodies in Scotland have a duty to further the conservation of
biodiversity when carrying out their functions. The Council is
involved with a range of initiatives to protect, restore and enhance
biodiversity through the management of open spaces many with
the Tayside Biodiversity Partnership. Further information on the
Council’s work is available in the latest Biodiversity Duty Report
that can be accessed on the Council’s Enhancing Biodiversity
webpage.
Biodiversity in New Developments 
Detailed ecological survey is required in the form of an Ecological
Impact Assessment (EIA). Impact assessments are required for
habitats, species, and existing trees on site including the impact of
new artificial lighting. 
Submissions must include evidence of application of the mitigation
hierarchy of avoid, reduce, compensate for losses, and enhance. All
developments should aim to avoid adverse impacts in the first
instance, see the PKC Planning for Nature Guidance section 5.1.
Planning Guidance - Planning & Biodiversity - Perth & Kinross
Council (pkc.gov.uk) 
Conclusions from the ecology surveys and requirements detailed in
the PKC Planning for Nature Supplementary Guidance should be
used to create a Site Biodiversity Action Plan containing quantities,
locations, techniques, timescales, and monitoring arrangements. 
To satisfy NPF4 Policy 3, in Major planning applications we request:
 Integrated swift bricks in 25% of two storey homes
 Integrated bat bricks, boxes and tubes in 25% of two storey
homes
 Wildlife kerbs and amphibian ladders installed adjacent to
all road gullies within 500m of a SuDS Pond.
 Hedgehog highways by providing access gaps in wooden
fences 13cm x 13cm at ground level.
 Low lux-level downward facing development lighting
directed away from hedgerows, treelines and woodland
 Creating new and connecting existing habitats to contribute
towards nature networks. 
 Ponds, swales or rainwater gardens designed with
biodiversity in mind.
Page 228 of 254

Page 229

Open Space Strategy
A checklist of information required to inform a planning application
regarding biodiversity is provided in Annex 4 of the PKC Planning
for Nature Supplementary Guidance.
Along with private development, the Planning Authority work with
services across the Council to ensure biodiversity is protected and
enhanced through any upgrading and new build Council projects.
Trees, Woodlands and Forestry in New Developments
Trees, woodland and forestry are opportunities in development
and can add asset value for years to come. Early engagement with
an Ecologist and competent Arboricultural Consultant allows trees
to inform the layout allowing more to be retained and incorporated
into plans. 
Existing woodland, trees and hedgerows should be protected,
restored and expanded to connect to other habitats. The mitigation
hierarchy of avoid, reduce and compensate should be followed to
reduce impacts of development to woodland, trees and
biodiversity.
Clearing proposed sites pre-emptively prior to applying for planning
permission has increased over the last decade and is against NPF4
Policies. Clearance of development sites should only begin when
construction of the approved proposal is about to commence.
NPF4 Policy 6 aims to protect and expand forests, woodland and
trees by ensuring existing woodlands and trees are protected, and
cover is expanded and woodland and trees on development sites
are sustainably managed. NPF4 requires planning authorities to
prepare a forestry and woodland strategy which identifies
woodlands of high nature conservation value (WHNCV) within the
planning authority’s area.
Proposals that will result in loss of WHNCV will not be supported
while proposals that will protect, restore, enhance and connect
WHNCV will be supported.
Tree Planting Policy
This Council’s Tree Planting Policy sets Council-wide standards and
procedures for tree planting on all Council-owned Land and is
aimed at all Council staff or volunteers planting trees on Council
land. A consistent and well-planned approach enables efficient use
of available resources to achieve the Council’s aims to improve
Biodiversity through increased canopy cover, carbon sequestration
and ecological improvements as well as improving public health
and wellbeing and the amenity value of our greenspaces. To ensure
that the right trees are planted in the right place, the policy
provides guidance on appropriate planting stock, technique,
protection and maintenance for different locations. 
Nature Networks
Nature Networks play a critical role in protecting, enhancing and
connecting habitats. The Council has a responsibility to safeguard
Page 229 of 254

Page 230

Open Space Strategy 
and strengthen these networks through the planning process, land
management and partnership working. This includes protecting
existing assets, addressing fragmentation, and promoting
enhancement and restoration. 
LDP3 will identify Nature Networks and seek opportunities to
enhance and expand them through new development. Developers
will be required, where appropriate, to contribute to nature
networks. Where possible, these will link with urban green
networks and increase opportunities for communities to
responsibly access areas of high nature value.
Sustainable Urban Drainage Systems (SuDS)
In line with Scottish Water guidelines and the Council`s Flood Risk
Supplementary Guidance, Sustainable Urban Drainage Systems
(SuDS) should make a positive wider contribution to the quality of
blue-green networks in new developments. 
SuDS are a soft-engineering solution that manages rainwater and
potential flooding within the landscaping and greenspaces of a
development, contrary to traditional hard engineering approaches.
It aims to create multi-functional landscapes that deliver multiple
benefits for water management, amenity and biodiversity. The
Council is committed to this approach and to maximising the
multiple benefits of SuDS. 
SuDS should be:
 considered from the outset, with enough land allocated for
them within the site. Submissions should clearly reflect how the
water & drainage strategy has influenced the design approach
taken for the site.
 a network of detention features which connect to the wider
green and blue infrastructure (rather than only a single feature).
Consider different types of SUDS such as ponds, basins, green
roofs, swales and rain gardens. These should ideally be naturally
Page 230 of 254

Page 231

Open Space Strategy
linked, providing connectivity for people and wildlife within and
through the site.
 located at suitable topographic locations, integrated with other
public open space types wherever possible and safely designed
to co-exist with activity areas (e.g. playgrounds, sport
pitches).SuDS that are isolated and/or provide little amenity
value will not be considered part of the public open space
contribution.
 accessible and biodiverse, with suitable planting around the
edges to maximise their ecological value and also allow for an
economical maintenance regime.
The Open Space Supplementary Guidance (2021) includes technical
guidance on sustainable drainage in Appendix 2.
Bioretention areas
Smaller SuDS features can be incorporated with streets and can
substitute traditional shrub beds and single function amenity
planting. They typically consist of shallow depressions of different
shapes and sizes that drain surface water runoff and encourage
infiltrations into the ground. Bioretention features can be ideal
solutions for compact, high-density sites with limited space. Further
design guidance and specifications for soakaways including planting
are provided in the Perth and Kinross Open Space Supplementary
guidance. 
Swales 
Swales and basins can be various shapes and sizes and can be
integrated with informal amenity areas. Linear swales which are
ideal for narrow spaces such as linear open space corridors, road
verges and structure planting on the edge of developments. Further
design guidance and specifications for swales including planting are
provided in the Perth and Kinross Open Space Supplementary
guidance 
Channels and rills
Canals and rills are encouraged, these are open surface water
channels with hard edges, that water flows along, and they can
have a variety of cross sections to suit the urban landscape,
including the use of planting to provide both enhanced visual
appeal and water treatment. 
Ponds and basins  
Ponds and basins are encouraged, and providing access to SuDS
features for larger vehicles is often necessary in order to allow for
their long-term maintenance. However, gravelled roads which
surround basins and ponds can take away from their natural
appearance. `Green access tracks` are ideal for access that is
infrequently used, they are unobtrusive and blend in with the wider
Page 231 of 254

Page 232

Open Space Strategy 
amenity area. Green tracks and paths can become part of the
drainage system and facilitate water retention. Further guidance is
provided in the Open Space Provision for New Developments
Supplementary Guidance Supplementary Guidance. 
Community Involvement
Community Greenspace supports a network of 118 community
groups who are involved to a greater or lesser extent in the
management of open space. Groups are locality based and include
bloom groups, paths groups, friends of cemeteries, biodiversity
focussed and other groups. There are many benefits to this:
 Greater community engagement in the management of
these spaces
 Voluntary action to maintain and improve these spaces
 Match funding and design input for site improvement
projects
 Benefits for the individual through the above, and for
physical/mental health and wellbeing.
Events and Commercial Use of Open Spaces
Events and Commercial use can add functionality, engagement and
economic benefits to our open spaces. Sustainably managing open
spaces to provide these opportunities can improve local living,
support tourism and stimulate economic growth. 
The Council makes parks and other greenspaces available through a
booking process and works with event organisers, other agencies
and stakeholders to ensure events are safe, legal and appropriate in
the context of that space, in the context of its other functions
throughout the year. 
The Council may grant permission to catering vans and mobile
traders looking to operate in parks and countryside sites. Traders
must adhere to the standard code of conduct in order to operate
on Council greenspace sites. 
Contact parkevents@pkc.gov.uk for booking enquiries or for
guidance on how to trade in a park or countryside site.
Signage within Open Spaces
Signage in open spaces offer contact between users and those
responsible for the management and maintenance of that site. 
The Council has signage at the entrance to countryside sites &
premier parks. They also include new signage with the upgrade of
existing play areas. 
Page 232 of 254

Page 233

Open Space Strategy
For Premier Parks and Countryside Sites signage at entrances
generally include:
 Information about what can be found within the site;
 A directional map to help with navigation; and
 Information about other places of interest in the local area.
 Dementia friendly signage at MacRosty Park, Crieff 
Other signage found within Council sites may include:
 Core path directional signage
 Water safety information
 Other small informational signage e.g. no dog fouling
Burial Grounds
Perth and Kinross Council manage and maintains 176 burial
grounds across 132 locations, ranging from large active cemeteries
serving urban communities to historic rural churchyards and closed
burial grounds of significant heritage value. These sites form an
important part of the wider open space network, providing
accessible greenspace, contributing to local landscape, supporting
biodiversity, preserving cultural heritage and offering places for
quiet reflection.
Responsibility for these assets sits within Community Greenspace,
including Bereavement Services. Bereavement Services oversees
the operational management, maintenance and administration of
all council-owned burial grounds, ensuring they are maintained in a
safe, dignified and sustainable manner, in line with all relevant
legislation, guidance and best practice. In addition, Bereavement
Services manages Perth Crematorium, further supporting the
delivery of comprehensive burial and cremation services across the
Council area. There is also one privately operated burial ground in
Perth and Kinross. 
Burial grounds remain valued community assets, providing places
of remembrance, reflection and cultural significance for residents
and visitors and the Council recognises both its statutory and moral
responsibility to care for them to a high standard.
The Council’s Future Cemetery Provision Strategy highlights the
need to maintain sustainable burial capacity, particularly in
communities where capacity may fall below ten years. Burial
provision should therefore be planned not only as an operational
requirement but as an integral component of Perth and Kinross’s
wider green infrastructure network.
Cemeteries and burial grounds make a valuable contribution to the
Open Space Strategy by providing accessible, multifunctional
greenspace that supports community wellbeing, quiet reflection
and local identity. They also protect historic landscapes, enhance
biodiversity, contribute to tree canopy cover and support climate
resilience.
Page 233 of 254

Page 234

Open Space Strategy 
Many sites incorporate mature trees, grassland habitats and
heritage features, offering significant environmental, visual and
cultural value. Within settlements, they function as informal
greenspaces, while in rural areas they often represent important
publicly accessible land and ecological corridors. Community
engagement plays an important role in the stewardship of these
spaces. “Friends of Cemetery” groups and similar local initiatives,
including activities such as grow-wild trails, contribute positively to
site management, biodiversity enhancement and public
appreciation. These groups support community ownership,
encourage volunteering and help strengthen the role of burial
grounds as valued local greenspaces.
Future cemetery provision will adopt a proactive, plan-led approach
to ensure long-term capacity. New or extended burial sites should
be integrated with green infrastructure planning, protect landscape
character, enhance biodiversity and improve accessibility and
connectivity. Opportunities for woodland, natural and
environmentally sensitive burial practices will be supported where
appropriate.
Burial grounds also play an important role in delivering biodiversity
and climate objectives through habitat creation, pollinator-friendly
planting, native tree establishment and low-intensity land
management. These benefits will be balanced alongside
operational needs, visitor expectations and heritage considerations.
Many cemeteries contain features of historic and cultural
significance, contributing to the area’s historic environment and
community identity. Their continued conservation and sensitive
management are essential.  
Page 234 of 254

Page 235

Open Space Strategy
Asset Management
The Community Greenspace Asset Management Plan (CGAMP)
provides the operational framework for managing Perth and
Kinross Council’s extensive portfolio of greenspace assets, including
around 520 hectares of grassland, 32,000 trees, 145 play areas, 159
bridges and over 8,200 infrastructure assets such as benches, litter
bins, signs and picnic tables. The estimated net book value of these
assets was £7.59 million in 2023.
A key feature of the plan is the use of an Asset Challenge process
that assesses assets against condition, suitability, utilisation, value
for money and climate change considerations to inform investment
decisions. The plan includes a funded six-year capital programme
and identifies a potential 30-year investment requirement of
approximately £128.8 million to maintain the current greenspace
asset base and service standards. The plan also highlights the
important role of community groups and volunteers, who
contribute more than 25,000 hours annually to the maintenance
and enhancement of local greenspaces.
The Community Greenspace Asset Management Strategy (2023–
2029) (CGAMS) sets out PKC’s approach to managing, maintaining
and enhancing its greenspace assets to support healthy, sustainable
and resilient communities. 
The strategy is aligned with the Council’s Corporate Asset
Management Framework and is guided by the vision of “Working
together to maintain, improve and promote our shared spaces for
all to enjoy.”
Delivery is structured around four key principles:
 Collaborating with communities and volunteers to improve
wellbeing, encourage participation and support community-
led greenspace projects.
 Maximising shared opportunities through partnership
working, coordinated investment and improved access to
greenspace assets.
 Enhancing sustainability and biodiversity by promoting
nature recovery, sustainable management practices, native
planting and climate resilience.
 Applying lifecycle management and proactive maintenance
to ensure greenspace assets remain safe, accessible and fit
for purpose over the long term.
The CGAMS and CGAMP provide an important evidence base for
the OSS and support its delivery. While the OSS focuses on
assessing wider provision and requirements, the CGAMS and
CGAMP establish the corporate framework for managing,
maintaining and investing of PKC’s greenspace assets in the long-
term. The priorities and policies within the OSS will therefore
complement and help inform the future implementation of PKC’s
greenspace management and investment programmes.
Page 235 of 254

Page 236

Open Space Strategy 
Current Requirements
The evidence base gathered through the open space audit and
engagement activities highlights a number of requirements for the
existing open space network. Key requirements are to:
 Safeguard existing open space provision, including
approximately 70 hectares of undesignated POS identified
through the audit.
 Improve the quality, accessibility and functionality of open
spaces so they can support a wider range of recreational,
sporting, play, social and environmental functions for all user
groups.
 Expand active travel opportunities within green networks,
ensuring communities have access to green corridors that
facilitate walking, wheeling and cycling through settlements and
into the wider countryside.
 Strengthen management and maintenance arrangements,
particularly in the context of resource constraints and ageing
infrastructure.
 Support collaborative management approaches with
communities and secure investment to deliver local priority
actions and projects. 
Future Requirements
Looking ahead, the strategy must also plan for future growth,
climate challenges and evolving community needs. Key
requirements are to:
 Integrate good-quality, multifunctional blue-green networks
into new development, ensuring open space standards are met.
 Support local living by ensuring active travel opportunities are
integrated with blue-green networks.
 Deliver nature-positive outcomes through habitat creation,
biodiversity enhancement and connections to nature networks.
 Improve climate resilience through measures such as urban
greening, sustainable drainage (SuDS), shading and flood
management measures.
 Ensure the long-term sustainability of open spaces through
effective maintenance arrangements, partnership working and
community involvement. 
Current and Future Requirements
Page 236 of 254

Page 237

Open Space Audit Report
Scope:
In accordance with statutory requirements an audit of existing open space provision
across Perth and Kinross was undertaken to inform the preparation of the Open Space
Strategy (OSS). The purpose of the audit is to undertake an assessment of the quantity,
quality and accessibility (i.e. spatial distribution) of existing open spaces.
Open space is defined here as "space within and on the edge of settlements comprising
green space or civic areas such as squares, market places and other paved or hard
landscaped areas with a civic function.”
The audit considered all open spaces within or adjacent to settlement boundaries
identified in the current Local Development Plan (LDP2) that are 0.2ha or larger, as well
as smaller sites considered to be of local importance. Please note that this audit
considers all open spaces, including both publicly and privately managed sites. For
a breakdown of the Council’s greenspace assets please refer to the Community
Greenspace Asset Management Plan (CGAMP).
Each site was visited and initially pre-screened to identify a subset of open spaces
deemed accessible to the public. The public open spaces (POS) where then taken
forward to the quantity benchmarking and quality assessment stage of the audit. 
A summary of the spaces considered in the audit is provided in the table below.  
Table 1: Overview of all open spaces considered in audit
Summary of Open Spaces Included in Audit
Type No. Sites Total Area
(Ha)
Public open space (POS) 432 906
Open space with limited accessibility or
public functions (e.g. golf courses,
allotments, natural space with no formal
access)
480 1,996
Total 912 2,902 
Typologies
Each audited open space has been assigned one or more typologies based on the
classifications set out in Planning Advice Note 65: Planning and Open Space (PAN 65).
To better reflect local characteristics in Perth and Kinross, and to ensure that LDP2
9
Page 237 of 254

Page 238

designated open spaces are appropriately classified, some categories have been
subdivided and additional typologies introduced where necessary. This approach
provides a more accurate and detailed understanding of the function and use of open
spaces. 
The table below provides an overview of the typologies and quantities of each identified
across all open spaces considered in the audit. Note that most sites will have multiple
typologies, for example a public park may also contain a play space, playing field and
natural / semi-natural areas.
Table 2: Open space audit typologies
Type Description Count
(all)
Count
(Primary
Typology)
Area (Ha)
(Primary
Typology)
Agricultural
land
Land in active agricultural use, including
arable fields and grazing land, located within
or adjacent to settlements. While not primarily
used for recreation, many will have core paths
running through or around fields. No
agricultural land was identified as public open
space, however given the rural nature of many
settlements, some agricultural land is
designated in the LDP.
24 21 69.1
Allotments
and
Community
Growing
Space
Areas of land for growing fruit, vegetables and
other plants, either in individual allotments or
as a community activity. 20 19 9.8
Amenity
Greenspace
Informal, landscaped areas that provide visual
amenity and serve as a setting for the built
environment, often located within housing
areas, commercial areas or alongside roads.
These spaces may support casual recreation,
such as sitting or informal play, but are not
specifically designed for formal activities.
189 149 108.9
Churchyard /
Cemetery
Land associated with burial grounds,
including churchyards and cemeteries, as well
as ancillary church grounds not currently in
active use for burial. These often provide open
space with cultural, historic and landscape
value, and often contribute to local
biodiversity and informal access.
83 83 72.6
Civic Space Squares, streets and waterfront promenades,
predominantly of hard landscaping that
provide a focus for pedestrian activity and can
make connections for people and for wildlife.
5 1 0.8
Page 238 of 254

Page 239

Green
Corridor
Routes including canals, river corridors and
old railway lines, linking different areas within
a town or city as part of a designated and
managed network and used for walking,
cycling or horse riding, or linking towns and
cities to their surrounding countryside or
country parks. These may link green spaces
together.
108 36 124.7
Natural /
Semi-
Natural
Greenspace
Areas of predominantly natural vegetation,
including woodlands, grasslands, wetlands
and countryside sites. This includes both
accessible natural spaces (e.g. paths within
woodlands or managed sites) and naturalised
areas that are not readily accessible. These
spaces often have high ecological value,
contribution to biodiversity, habitat networks
and opportunities for communities to connect
with nature.
215 164 721
Play Space Areas specifically designed and equipped for
children’s play, typically including fixed play
equipment such as swings, slides and
climbing structures. These spaces provide
safe opportunities for outdoor play and
physical activity for children of different age
groups. (Note: This figure includes 147
adopted playgrounds and 23 that are privately
managed)
168 60 19.6
Private
Garden or
Grounds
Areas of land normally enclosed and
associated with a house or institution and
reserved for private use. Access rights do not
normally apply to these sites, but such sites
often provide landscape and biodiversity
value.
26 22 57.5
Public
Garden
Formally designed and managed
greenspaces, often of horticultural or
ornamental value, which are publicly
accessible. These spaces typically provide
opportunities for passive recreation,
enjoyment of planting and landscaping, and
may also contribute to the setting of historic
or civic areas.
27 25 7.2
Public Park Formally designed and managed greenspaces
which are publicly accessible and provide a
range of informal and formal recreational
opportunities. These areas may include paths,
seating, landscaped areas, play facilities and
121 117 274.2
Page 239 of 254

Page 240

sports provisions. They often serve as key
destination spaces within settlements.
School
Grounds
Open space within the grounds of educational
establishments, including schools and
campuses. These areas may include playing
fields, courts and landscaped spaces, and are
primarily for use by students and staff, with no
general public access.
90 75 122.9
Sport Area Large and generally flat areas of grassland or
specially designed surfaces, used primarily for
designated sports (including playing fields,
golf courses, tennis courts and bowling
greens). This includes facilities that are
publicly accessible as well as those that are
bookable or privately managed. 
272 142 1,314.2 
Quantity Assessment
The total area of POS included in the audit was used to benchmark against the
Council’s open space quantity standard which is for every community to have a ratio of
3.5ha per 1000 people. Census 2022 data was used and in some cases population
estimates were calculated by multiplying the number of households by the average
household size which is 2.2 people. 
Although the quantity benchmarking focused on populations residing within LDP2
settlements, it is helpful to contextualise the findings at a wider authority scale. If the
total Perth and Kinross population of 150,953 (Census, 2022) were applied to the
quantity standard, the resulting POS requirement would be approximately 528ha. In
comparison, the audit identified around 906ha of POS, indicating that, at an overall
level, open space quantity comfortably exceeds the benchmark but requires an
accessibility analysis as to whether its distribution is suitable. The table below breaks
these figures down by the primary typology of sites.
Table 3: Public open space by primary typology
Type Count
(Primary Typology)
Area (Ha)
(Primary Typology)
Allotments and Community
Growing Spaces 1 0.6
Amenity Greenspace 77 37.5
Churchyard / Cemetery 67 59.8
Civic Space 1 0.8
Green Corridor 35 111.6
Page 240 of 254

Page 241

Natural / Semi-Natural
Greenspace 36 357.7
Play Space 58 19.5
Public Garden 25 7.2
Public Park 115 273.3
Sport Area 17 38.1 
The audit included 36 sites primarily classified as natural / semi-natural greenspace.
These comprise countryside sites, woodlands, and blue spaces associated with rivers
and lochs that were considered accessible to a broad range of users and contain some
level of recreational infrastructure. Collectively, these 36 sites account for
approximately 360ha of all POS. The inclusion of these large natural assets contributes
significantly to the over-provision identified in a number of settlements, particularly
where large countryside sites are present, including Aberfeldy, Alyth, Crieff and
Pitlochry.
A comprehensive summary of settlement-level results was produced as part of the
assessment and is available in the Open Space Audit Results spreadsheet. This is
supported by a series of spatial datasets developed during the assessment process
available on the Open Space Audit Map. For clarity and easy of interpretation, the
following tables present a summary of the results, focusing specifically on LDP2
settlements and Perth neighbourhoods with populations exceeding 1,000 residents.
Table 4: Open space audit quantity outputs: LDP2 settlements
Settlements
(>1000
residents)
Population
(Census
2022)
Open Space
Requirement
(Ha)
Number
of Sites
Audited
Area
(Ha) of
Sites
Audited
Meets
Quantity
Standard
Quantity
Shortfall
(Ha)
Perth 49292 172.5 110 371.9 Yes 
Blairgowrie 9433 33 21 29.5 No -3.5
Kinross and
Milnathort 7606 26.6 31 40.6 Yes 
Crieff 7142 25 17 65.5 Yes 
Auchterarder 6061 21.2 15 24.3 Yes 
Scone 5232 18.3 12 34 Yes 
Bridge of Earn 2918 10.2 10 8.1 No -2.1
Pitlochry 2694 9.4 16 49.3 Yes 
Alyth 2345 8.2 8 31.7 Yes 
Coupar Angus 2132 7.5 6 12.9 Yes 
Invergowrie 1969 6.89 3 7.98 Yes 
Aberfeldy 1886 6.6 11 63.1 Yes 
Comrie  1847 6.5 8 8.5 Yes 
Inchture 1565 5.5 7 8.5 Yes 
Page 241 of 254

Page 242

Luncarty 1514 5.3 7 8.5 Yes 
Errol 1500 5.3 4 5.7 Yes 
Stanley 1497 5.2 3 1.3 No -4
Abernethy 1425 5 7 3.7 No -1.3
Methven 1301 4.6 4 7 Yes 
Bankfoot 1254 4.4 7 12.7 Yes 
Dunkeld and
Birnam 1194 4.2 16 22.7 Yes 
St Madoes and
Glencarse 1096 3.8 4 4.9 Yes 
Longforgan 1079 3.8 3 1.9 No -1.9 
Table 5: Open space audit quantity outputs: Perth neighbourhoods
Perth
Neighbourhoods
Population
(estimate)
Open Space
Requirement
(Ha)
Number
of Sites
Audited
Area
(Ha) of
Sites
Audited
Meets
Quantity
Standard
Quantity
Shortfall
(Ha)
Gannochy,
Bridgend, Kinnoull,
Corsiehill and
Barnhill
3933.6 13.77 12 101.3 Yes 
Letham and
Hillyland 9849.4 34.47 15 29.3 No -5.15
Tulloch 5728.8 20.05 19 27.6 Yes 
North Muirton,
Muirton and
Balhousie
9356.6 32.75 14 66.5 Yes 
Moncrieffe, Craigie
and Friarton 7986 27.95 13 80.1 Yes 
Western Edge,
Woodlands and
Cherrybank
8615.2 30.15 23 32.3 Yes 
Bertha Park 1443.2 5.05 2 0.5 No -4.55
City Centre 7326 25.64 5 23.8 No -1.85
Almondbank,
Huntingtower and
Ruthvenfield
3075.6 10.76 7 10.5 No -0.22  
Overall, the audit identified approximately 70ha of undesignated public open space
within settlement boundaries. Another 425ha of public open space adjacent to
settlement boundaries was included in the audit; these primarily comprised of
accessible natural spaces (e.g. Countryside Sites) but also include sports pitches,
public parks, cemeteries and amenity spaces. These spaces may be protected under
other policy measures; however, these will be reviewed during the LDP3 preparation
process to ensure effective safeguarding measures are in place.
Page 242 of 254

Page 243

Accessibility Analysis
An accessibility analysis was undertaken to assess the distribution of public open
spaces in relation to the population based on the Council’s accessibility standards. The
findings help to identify areas of sufficient provision as well as locations where
accessibility gaps may exist. 
The analysis was undertaken using network analysis within a Geographic Information
System (GIS) to provide a realistic representation of how people move through
communities. Rather than a straight-line distance, the approach utilised a detailed
pedestrian network composed of streets and paths. Service areas (catchments) were
generated around access points mapped for each open space based on the following
thresholds: 
• Public Park – 700m
• Playing Field – 1200m
• Neighbourhood Equipped Area for Play (NEAP) – 1000m
• Local Equipped Area for Play (LEAP) – 400m
The table below presents the outputs of the accessibility analysis across all LDP2
designated settlements and for those with over 50 dwellings. These figures reflect that it
is often smaller rural settlements that have less variety in provision due to their size,
densities and settings. 
Table 6: Percentage houses meeting accessibility standards across LDP2
settlements 
Public
Park
(700m)
Playing
Field
(1200m)
LEAP 
(400m)
NEAP 
(1000m)
All
Settlements 84% 95% 60% 84%
Settlements
>50
dwellings
85% 97% 60% 85%
A comprehensive set of settlement-level results was produced as part of the analysis,
accompanied by mapped catchments that provide a spatial evidence base to inform
planning decisions, including the identification of site requirements and developer
contributions. For clarity and easy of interpretation, the following tables present a
summary of the results, focusing specifically on LDP2 settlements and Perth
neighbourhoods with populations exceeding 1,000 residents. The table is colour coded
to visualise settlement performance in the audit with those scoring in the 10th decile
shown green, 9th yellow, 8th orange and those in the 7th or below (<70%) shown red.
Page 243 of 254

Page 244

Table 7: Percentage households meeting accessibility standards in LDP2
settlements with over 1000 residents
Settlement
Population
(Census
2022)
Public
Park
(700m)
Playing
Field
(1200m)
LEAP
(400m)
NEAP
(1000m)
Perth 49292 89% 99% 62% 88%
Blairgowrie 9433 75% 98% 58% 70%
Kinross and Milnathort 7606 82% 100% 69% 91%
Crieff 7142 95% 99% 52% 89%
Auchterarder 6061 59% 91% 62% 74%
Scone 5232 87% 100% 43% 84%
Bridge of Earn 2918 100% 100% 63% 76%
Pitlochry 2694 87% 97% 59% 85%
Alyth 2345 96% 99% 67% 95%
Coupar Angus 2132 90% 99% 80% 65%
Invergowrie 1969 88% 96% 55% 88%
Aberfeldy 1886 94% 100% 84% 91%
Comrie 1847 79% 98% 42% 87%
Inchture 1565 100% 100% 55% 100%
Luncarty 1514 94% 99% 41% 98%
Errol 1500 100% 100% 70% 100%
Stanley 1497 83% 95% 71% 96%
Abernethy 1425 86% 96% 49% 92%
Methven 1301 91% 100% 48% 100%
Bankfoot 1254 88% 98% 73% 98%
Dunkeld and Birnam 1194 97% 94% 72% 96%
St Madoes and Glencarse 1096 92% 100% 90% 97%
Longforgan 1079 57% 100% 24% 80% 
Page 244 of 254

Page 245

Table 8: Percentage houses meeting accessibility standards in Perth
neighbourhoods with over 1000 residents
Neighbourhood
Population
(estimate
based on
no.
households)
% Houses Meeting Accessibility
Standard
Public
Park
(700m)
Playing
Field
(1200m)
LEAP
(400m)
NEAP
(1000m)
Gannochy, Bridgend, Kinnoull,
Corsiehill and Barnhill 3933 98% 99% 54% 71%
Letham and Hillyland 9849 100% 100% 89% 100%
Tulloch 5728 100% 100% 95% 100%
North Muirton, Muirton and
Balhousie 9356 99% 100% 67% 100%
Moncrieffe, Craigie and Friarton 7986 95% 100% 72% 96%
Western Edge, Woodlands and
Cherrybank 8615 74% 99% 42% 82%
Bertha Park 1443 0% 100% 0% 0%
City Centre 7326 100% 100% 17% 100%
Almondbank, Huntingtower and
Ruthvenfield 3075 29% 77% 32% 49% 
Quality Assessment
A quality assessment was undertaken to evaluate the condition and characteristics of
open spaces identified as publicly accessible in the audit. The findings identify those
spaces that are performing well and provide good value to communities, as well as
those where improvements may be required.
Each criterion was scored on a scale of 1 to 5, with an overall quality score
subsequently derived for each site. The scores correspond to the following quality
classifications:
1 2 3 4 5
Poor Fair Good Very Good Excellent
The following criteria were considered during the quality assessment for each site:
Accessibility - This criterion considers the accessibility of the site for all users,
regarding inclusive and barrier-free access. The following sub-criteria were considered:
• Is there appropriate directional signage?
• Is appropriate lighting provided at entrances?
• Are there safe crossing points on roads leading to entrances?
Page 245 of 254

Page 246

• Are entrances accessible to all forms of mobility?
• Are internal paths accessible to all forms of mobility? 
• Are internal paths in good condition?
• Are there areas of importance likely to be inaccessible to people with limited
mobility?
Place Quality - This criterion considers the overall design quality and provides an
indication of how the space is perceived, including feelings of safety. The following sub-
criteria were considered:
• On approach does the site seem welcoming?
• Is the site legible?
• Is there appropriate informational signage?
• Is there an appropriate level of lighting throughout the site?
• Is there evidence of anti-social behaviour?
Care and Maintenance - This criterion considers the site’s condition and standard of
maintenance.  The following sub-criteria were considered:
• Are fences, railings and walls in good condition?
• Are there issues of litter, fly tipping or dog fouling?
• Are there issues of vandalism or graffiti?
• Is the infrastructure on site in good condition?
• Is the vegetation on site appropriately managed?
Biodiversity - This criterion considers the provision of natural assets and habitats within
the site and its connectivity to the surrounding green network. The following sub-criteria
were considered:
• Is there good habitat connectivity across or around the site for wildlife?
• Does there appear to be good connectivity beyond the site?
• Are there naturalised areas on the site?
• Are there waterbodies (including SUDS) or wetlands?
Community Use - This criterion considers the provision of recreational infrastructure
and how this supports the intended use, user needs and overall quality of the space.
The following sub-criteria were considered:
Page 246 of 254

Page 247

• Does the site contain appropriate facilities for its typology, location and size?
• Does the quantity and siting of any furniture seem appropriate to the use of the
space?
• Is there an appropriate provision of bins across the site and are they ideally
located?
Overall, only ten of the sites assessed failed to meet the required quality standard. The
table below sets out the number of sites that scored less than ‘Good’ for each criterion
in the assessment.
Table 9: Public open space quality assessment summary results
Quality Criterion
% sites
scoring
‘Good’ or
above
No. sites
scoring
below
‘Good’
Accessibility 78% 95
Place Quality 84% 69
Care and Maintenance 94% 27
Biodiversity 91% 40
Community Use 87% 57
Overall Quality Score 98% 10
This quality assessment was undertaken using a standardised method across all sites
to ensure comparability. However, consideration was given to the type and size of each
site when scoring the criteria, recognising that requirements vary across different sites.
It is acknowledged that, in future, a more nuanced approach would be beneficial, with
quality assessments tailored to reflect specific typologies or hierarchies, allowing for a
more context-sensitive evaluation.
Conclusions 
It is important to recognise that a range of factors contribute to identified shortfalls in
POS provision in certain settlements: 
• Historic development of the settlement that did not prioritise open space
provision. This is particularly evident in Perth. 
• The presence of spaces that could not be classified as POS in the audit due to
accessibility constraints or lack of clear public function. 
• Standard open space typologies do not account for the recreational value of
accessible countryside, which may lessen demand for formal provision in
smaller rural communities.
Page 247 of 254

Page 248

• The phased delivery of larger public open spaces in new developments can
result in temporary shortfalls following housing occupation.
It is important to note that addressing shortfalls in provision is unlikely to be achieved
solely through contributions from new development, as these must be proportionate to
the scale of development. However, opportunities will be identified through LDP3, and,
in some cases, PKC should seek to secure external funding to address gaps.
Addressing identified deficiencies remains a key priority and where they have been
identified the following approaches will be pursued:
• Safeguard existing POS provision.
• Secure appropriate on-site and off-site developer contributions.
• Pursue external funding opportunities using the OSS as an evidence-base.
• Apply the Infrastructure First principle to ensure POS in new developments are
delivered at the earliest practical stage, taking account of other infrastructure
requirements and any masterplanning of the site.
• Review sites identified in the audit that were not classified as POS, and, where
appropriate, improve accessibility and functionality to make them public spaces.
• Prioritise quality enhancements to existing open spaces, and path networks, in
areas where new provision is not feasible.
• Regarding the provision of new play spaces or sport facilities, deficiencies
identified in the audit will be addressed following the approaches set out in the
Playground Strategy and Policy on Provision of Facilities for Outdoor Pitch Sports.
Page 248 of 254

Page 249

Settlement Population POS Required (Ha) Sites Audited Total POS Area (Ha) POS Deficiency/Surplus (Ha) Meet Quantity Standard Public Park (700m) Playing Field (1200m) LEAP (400m) NRPEAP (1000m)
Aberargie 94.6 0.33 0 0.00 -0.3 No 0% 0% 0% 0%
Aberfeldy 1886 6.60 11 63.06 56.5 Yes 94% 100% 84% 91%
Abernethy 1425 4.99 7 3.67 -1.3 No 86% 96% 49% 92%
Aberuthven 457.6 1.60 3 6.20 4.6 Yes 100% 100% 89% 100%
Acharn 105.6 0.37 1 0.15 -0.2 No 100% 100% 100% 100%
Alyth 2345 8.21 8 31.70 23.5 Yes 96% 99% 67% 94%
Ardler 167.2 0.59 3 2.41 1.8 Yes 100% 100% 100% 100%
Auchterarder 6061 21.21 15 24.30 3.1 Yes 59% 91% 62% 74%
Balado 145.2 0.51 0 0.00 -0.5 No 0% 0% 0% 0%
Balbeggie 455.4 1.59 1 0.48 -1.1 No 100% 100% 90% 100%
Baledgarno 50.6 0.18 1 0.55 0.4 Yes 0% 0% 0% 0%
Ballinluig 277.2 0.97 2 1.85 0.9 Yes 0% 100% 71% 100%
Balnaguard 50.6 0.18 0 0.00 -0.2 No 0% 0% 0% 0%
Bankfoot 1254 4.39 7 12.74 8.3 Yes 88% 98% 73% 98%
Binn Farm 6.6 0.02 0 0.00 0.0 No 0% 0% 0% 0%
Blackford 913 3.20 6 6.56 3.4 Yes 87% 100% 74% 100%
Blairgowrie& Rattray 9433 33.02 21 29.47 -3.5 No 75% 98% 58% 70%
Blairingone 110 0.39 1 0.28 -0.1 No 100% 100% 98% 100%
Boltachan 59.4 0.21 1 13.66 13.5 Yes 0% 100% 0% 22%
Braco 562 1.97 6 3.10 1.1 Yes 100% 100% 86% 100%
Bridge of Cally 81.4 0.28 0 0.00 -0.3 No 0% 0% 0% 0%
Bridge of Earn 2918 10.21 10 8.15 -2.1 No 100% 100% 63% 76%
Burrelton/Woodside 750.2 2.63 3 3.35 0.7 Yes 74% 100% 31% 83%
Butterstone 41.8 0.15 1 1.47 1.3 Yes 0% 100% 0% 0%
Camserney 57.2 0.20 0 0.00 -0.2 No 0% 0% 0% 0%
Caputh 110 0.39 2 0.99 0.6 Yes 100% 100% 100% 100%
Carnbo 70.4 0.25 0 0.00 -0.2 No 0% 0% 0% 0%
Carsie 173.8 0.61 2 0.65 0.0 Yes 100% 62% 94% 100%
Clathymore 107.8 0.38 0 0.00 -0.4 No 0% 0% 0% 0%
Cleish 24.2 0.08 2 0.39 0.3 Yes 0% 0% 0% 0%
Comrie 1847 6.46 8 8.53 2.1 Yes 79% 98% 42% 0%
Concraigie 6.6 0.02 0 0.00 0.0 No 0% 0% 0% 0%
Coshieville 26.4 0.09 0 0.00 -0.1 No 0% 0% 0% 0%
Cottown/Chapelhill 85.8 0.30 0 0.00 -0.3 No 0% 95% 0% 36%
Coupar Angus 2132 7.46 6 12.88 5.4 Yes 90% 99% 80% 65%
Craigie 33 0.12 0 0.00 -0.1 No 0% 0% 0% 0%
Crieff 7142 25.00 17 65.46 40.5 Yes 95% 99% 52% 89%
Croftinloan/Donavourd/East Haugh/Ballyoukan 255.2 0.89 0 0.00 -0.9 No 0% 0% 0% 0%
Cromwell Park 22 0.08 0 0.00 -0.1 No 0% 20% 0% 0%
Crook of Devon 698 2.44 6 2.33 -0.2 No 70% 88% 52% 81%
Cultybraggan 13.2 0.05 0 0.00 0.0 No 0% 0% 0% 0%
Dalcrue 0 0.00 0 0.00 0.0 No 0% 0% 0% 0%
Drunzie 72.6 0.25 0 0.00 -0.3 No 0% 0% 0% 0%
Dull 83.6 0.29 1 0.22 -0.1 No 0% 0% 0% 0%
Dunkeld & Birnam 1194 4.18 16 22.70 18.5 Yes 97% 94% 72% 96%
Dunning 885 3.10 7 10.66 7.2 Yes 96% 100% 76% 100%
Errol 1500 5.25 4 5.68 0.4 Yes 100% 100% 70% 100%
Errol Airfield/Grange 354.2 1.24 1 0.01 -1.2 No 0% 0% 65% 0%
Fearnan 213.4 0.75 1 0.03 -0.7 No 0% 0% 48% 100%
Forgandenny 545 1.91 2 1.39 -0.5 No 80% 100% 63% 96%
Forteviot 35.2 0.12 1 0.16 0.0 Yes 0% 100% 0% 0%
Fortingall 72.6 0.25 1 0.15 -0.1 No 0% 0% 0% 0%
Fowlis Wester 61.6 0.22 1 0.26 0.0 Yes 0% 0% 0% 0%
Gilmerton 213.4 0.75 1 0.92 0.2 Yes 100% 100% 96% 100%
Gleneagles 525.8 1.84 0 0.00 -1.8 No 0% 0% 0% 0%
Glenfarg 663 2.32 3 5.35 2.9 Yes 89% 100% 52% 100%
Glenlomond 118.8 0.42 0 0.00 -0.4 No 0% 0% 0% 0%
Grandtully 68.2 0.24 1 1.98 1.7 Yes 100% 100% 84% 100%
Greenacres 46.2 0.16 0 0.00 -0.2 No 0% 0% 0% 0%
Greenloaning 286 1.00 1 0.33 -0.7 No 0% 0% 77% 100%
Guildtown 492.8 1.72 1 2.72 1.0 Yes 100% 100% 75% 100%
gWest 4.4 0.02 0 0.00 0.0 No 0% 0% 0% 0%
Hattonburn 48.4 0.17 0 0.00 -0.2 No 0% 0% 0% 0%
Inchture 1565 5.48 7 8.47 3.0 Yes 100% 100% 55% 100%
Invergowrie 1969 6.89 3 7.98 1.1 Yes 88% 96% 55% 88%
Keltybridge 143 0.50 0 0.00 -0.5 No 0% 0% 0% 0%
Kenmore 145.2 0.51 6 5.79 5.3 Yes 94% 100% 79% 100%
Kettins 127.6 0.45 3 2.19 1.7 Yes 100% 100% 86% 100%
9
Page 249 of 254

Page 250

Kinfauns 136.4 0.48 0 0.00 -0.5 No 0% 0% 0% 0%
Kinloch 52.8 0.18 0 0.00 -0.2 No 0% 0% 0% 0%
Kinloch Rannoch 299.2 1.05 1 2.31 1.3 Yes 98% 100% 49% 100%
Kinnaird (Highland) 66 0.23 0 0.00 -0.2 No 0% 0% 0% 0%
Kinnaird (Perth) 59.4 0.21 2 1.73 1.5 Yes 0% 0% 0% 0%
Kinnesswood 533 1.87 1 0.46 -1.3 No 100% 100% 77% 0%
Kinross & Milnathort 7606 26.62 31 40.55 13.9 Yes 82% 100% 69% 91%
Kinrossie 125.4 0.44 1 1.62 1.2 Yes 100% 100% 72% 100%
Kirkmichael 187 0.65 4 2.35 1.7 Yes 0% 0% 95% 100%
Little Ballinluig 110 0.39 0 0.00 -0.4 No 0% 100% 0% 98%
Logierait 61.6 0.22 2 0.43 0.2 Yes 0% 79% 0% 0%
Longforgan 1079 3.78 3 1.87 -1.9 No 57% 100% 24% 80%
Luncarty 1514 5.30 7 8.50 3.2 Yes 94% 99% 41% 98%
Maryburgh 24.2 0.08 0 0.00 -0.1 No 0% 0% 0% 0%
Meigle 699.6 2.45 4 7.60 5.2 Yes 88% 100% 59% 96%
Meikleour 101.2 0.35 0 0.00 -0.4 No 0% 0% 0% 0%
Methven 1301 4.55 4 6.95 2.4 Yes 91% 100% 48% 100%
Murthly/Gellyburn 699.6 2.45 4 2.33 -0.1 No 78% 100% 40% 49%
Muthill 680 2.38 4 2.85 0.4 Yes 100% 100% 85% 100%
New Alyth 187 0.65 1 0.25 -0.4 No 100% 100% 100% 100%
Ochil Hills Hospital 79.2 0.28 0 0.00 -0.3 No 0% 0% 100% 100%
Oudenarde 435.6 1.52 0 0.00 -1.5 No 18% 95% 0% 32%
Perth 49292 172.52 110 371.94 199.4 Yes 89% 99% 62% 88%
Perth Airport 151.8 0.53 0 0.00 -0.5 No 0% 0% 0% 0%
Pitcairngreen 162.8 0.57 1 2.15 1.6 Yes 100% 100% 100% 100%
Pitlochry 2694 9.43 16 49.35 39.9 Yes 87% 97% 59% 85%
Powmill 250.8 0.88 1 0.29 -0.6 No 75% 99% 71% 96%
Rait 70.4 0.25 2 0.61 0.4 Yes 0% 0% 0% 0%
Rannoch Station 13.2 0.05 0 0.00 0.0 No 0% 0% 0% 0%
Rumbling Bridge 116.6 0.41 1 5.60 5.2 Yes 0% 42% 0% 0%
Scone 5232 18.31 12 33.95 15.6 Yes 87% 100% 43% 84%
Scotlandwell 308 1.08 2 14.85 13.8 Yes 100% 100% 81% 100%
Spittalfield 176 0.62 1 0.39 -0.2 No 100% 99% 100% 100%
St David's 83.6 0.29 0 0.00 -0.3 No 0% 0% 0% 0%
St Madoes & Glencarse 1096 3.84 4 4.90 1.1 Yes 92% 100% 90% 97%
Stanley 1497 5.24 3 1.25 -4.0 No 83% 95% 71% 96%
Strathtay 125.4 0.44 0 0.00 -0.4 No 60% 100% 18% 88%
Tibbermore 83.6 0.29 0 0.00 -0.3 No 0% 0% 0% 0%
Trochry 33 0.12 0 0.00 -0.1 No 0% 0% 0% 0%
Tummel Bridge 90.2 0.32 0 0.00 -0.3 No 0% 0% 0% 0%
Weem 68.2 0.24 1 0.20 0.0 No 0% 97% 0% 0%
Wester Balgedie 81.4 0.28 0 0.00 -0.3 No 0% 0% 0% 0%
Wolfhill 213.4 0.75 2 0.93 0.2 Yes 100% 100% 86% 100%
Page 250 of 254

Page 251

Neighbourhood Population POS Required (Ha) Sites Audited Total POS Area (Ha) POS Deficiency/Surplus (Ha) Meet Quantity Standard Public Park (700m) Playing Field (1200m) LEAP (400m) NRPEAP (1000m)
Gannochy, Bridgend, Kinnoull, Corsiehill and Barnhill 3934 13.8 12 101.3 87.52 Yes 98% 99% 54% 71%
Letham and Hillyland 9849 34.5 15 29.3 -5.15 No 100% 100% 89% 100%
Tulloch 5729 20.1 19 27.6 7.51 Yes 100% 100% 95% 100%
Perth West 31 0.1 0 0.0 -0.11 No 21% 43% 0% 21%
North Muirton, Muirton and Balhousie 9357 32.7 14 66.5 33.78 Yes 99% 100% 67% 100%
Moncrieffe, Craigie and Friarton 7986 28.0 13 80.1 52.13 Yes 95% 100% 72% 96%
Western Edge, Woodlands and Cherrybank 8615 30.2 23 32.3 2.17 Yes 74% 99% 42% 82%
Bertha Park 1443 5.1 2 0.5 -4.55 No 0% 100% 0% 0%
City Centre 7326 25.6 5 23.8 -1.85 No 100% 100% 17% 100%
Almondbank, Huntingtower and Ruthvenfield 3076 10.8 7 10.5 -0.22 No 29% 77% 32% 49%
Page 251 of 254

Page 252

Page 252 of 254

Page 253

Appendix 4
Open Space Survey Summary Report
Survey period: 11 July - 11 August 2025 | Responses: 212
Executive Summary
Residents are frequent users of open spaces, with 85% visiting at least several times per week.
Parks, public gardens and natural greenspaces are the most valued and frequently used assets.
Despite high usage, only 44% of respondents are satisfied with local provision while 32% are
dissatisfied, indicating scope for improvement.
Key Findings
• 54% visit open spaces daily and a further 31% several times a week.
• Parks and public gardens (82%) and natural greenspaces (79%) are the most regularly used
spaces.
• Walking/dog walking (31%) and taking children to play (24%) are the main reasons for visits.
• 70% feel safe when using local open spaces.
• 44% are satisfied with local open spaces, compared with 32% dissatisfied.
• 48% identify poor condition or maintenance as a barrier to greater use.
• 59% selected better maintenance and cleanliness as the top improvement priority.
• 47% requested public toilets and 38% requested better play facilities.
Overall Satisfaction 
9
Page 253 of 254

Page 254

Top Improvement Priorities 
Most Regularly Used Open Space Types 
Implications for Open Space Strategy
The results suggest that investment should focus first on improving the quality and maintenance
of existing spaces before expanding provision. Enhanced play facilities, public toilets,
accessibility improvements and increased seating would address several of the most common
concerns. Responses also indicate continued demand for children's play spaces and improved
green corridor connections.
Recommendations
1. Target maintenance improvements in frequently used parks and greenspaces.
2. Review provision of toilets, seating and accessibility infrastructure.
3. Identify opportunities for improved play provision.
4. Consider underserved groups when designing future improvements.
5. Use mapped responses to inform site-specific interventions and designation reviews.
Page 254 of 254