Appendix 1 - Perth and Kinross Open Space Strategy 2027-2032
DRAFT
A Perth and Kinross where everyone can live life well,
free from poverty and inequality

Page 2

Open Space Strategy 
Contents
Forward ......................................................................................................................................................................... Error! Bookmark not defined.
Introduction ................................................................................................................................................................................................................. 1
Blue and Green Network Overview ............................................................................................................................................................................. 3
Open Space Standards ................................................................................................................................................................................................. 6
Policies and Guidance ................................................................................................................................................... Error! Bookmark not defined.
Current and Future Requirements ................................................................................................................................ Error! Bookmark not defined.

Page 3

Open Space Strategy
Purpose and Scope
This Open Space Strategy (OSS) sets a strategic framework for how
Perth and Kinross Council (PKC) will protect, enhance and expand
its network of open spaces and wider blue and green infrastructure
(BGI) so that it delivers multiple benefits for people and nature. 
This first OSS for Perth and Kinross has been prepared in fulfilment
of updated requirements under the Planning (Scotland) Act 2019
and National Planning Framework 4 (NPF4). It seeks to ensure that
local action contributes to national priorities.
The purpose of the OSS is to:
 Set out the Council’s quantity, quality and accessibility open
space standards.
 Present the findings of the open space audit benchmarked
against those standards, identifying areas where new or
enhanced provision is required.
 Identify areas of public open space to be safeguarded from
development in the Local Development Plan 3 (LDP3).
 Inform Development Management planning application
decisions which will include proposals relating to designated
open space or where new open space provision is required.
 Help embed blue-green infrastructure principles into future
development.
 Provide an evidence-base for external funding applications.
 Support the delivery of wider policy objectives.
Statutory and policy context
New duties on planning authorities to prepare and publish an OSS
were introduced in the Planning (Scotland) Act 2019. It inserted
section 3G Open Space Strategy into the Town and Country
Planning (Scotland) Act 1997. Section 3G (2) of the Act states “an
open space strategy is to set out a strategic framework of the
planning authority’s policies and proposals as to the development,
maintenance and use of green infrastructure in their district,
including open spaces and green networks.” Section 3G (3) of the
Act sets out an open space strategy must contain:
(a) an audit of existing open space provision
(b) an assessment of current and future requirements
(c) any other matter which the planning authority considers
appropriate.
Introduction

Page 4

Open Space Strategy 
NPF4, adopted 2023, forms part of Scotland’s statutory
Development Plan. It expects planning authorities to use the OSS as
an evidence base during the preparation of LDPs and the
assessment of development proposals.
NPF4, under Policy 20: Blue and green infrastructure, sets out an
expectation for the LDP’s spatial strategy to identify and protect
blue and green infrastructure assets and networks; enhance and
expand existing provision including new blue and/or green
infrastructure. This is to be informed by relevant, up-to-date audits
and strategies, covering the multiple functions and benefits of blue
and green infrastructure.
NPF4, under Policy 21: Play, recreation and sport, sets out an
expectation for LDPs to identify sites for sports, play and outdoor
recreation for people of all ages. This should be based on an
understanding of the needs and demand in the community and
informed by the planning authority’s OSS. These spaces are to be
incorporated as part of enhancing and expanding blue and green
infrastructure.
The OSS was prepared alongside a Play Sufficiency Assessment
(PSA) required by the Town and Country Planning (Play Sufficiency
Assessment) (Scotland) Regulations 2023. The PSA assessed the
quantity, quality and accessibility of formal and informal play
opportunities. Its findings directly inform the open space audit
(OSA) and OSS.
Scope of the Strategy
The OSS sets a five-year framework (2027-2031) with annual
monitoring and a mid-term review, aligned to the Development
Plan Scheme for LDP3 programme and evidence cycles.
The OSS focuses on blue and green infrastructure, including open
spaces and their networks. Figure 1 defines and illustrates the key
components of blue-green networks that are considered within the
scope of the OSS. The OSS considers these components at a range
of scales, from strategic networks (allowing cross boundary issues
to be considered) down to settlement, neighbourhood and
individual sites. To align with the statutory focus, the OSS primarily
considers spaces within and on the edge of settlements. Where
relevant, countryside access and assets are referenced.

Page 5

Open Space Strategy 
Figure 1: Blue-green network components

Page 6

Open Space Strategy 
Vision
Every community in Perth and Kinross enjoys safe, inclusive and
biodiverse open spaces within easy reach, connected by nature-
rich blue-green networks that support climate resilience, healthier
lives and equal opportunities for all ages.
This vision aligns with the principles of BGI:
Multifunctionality – the integration of different land uses and
activities within the same site in order to maximise the benefits to
people and nature and make the most efficient use of land.
Connectivity – the linking together of green areas, features and
spaces to enable people, animals and plants to move between
them.
Strategic Priorities and Outcomes
The OSS adopts priority areas consistent with the national
expectations for Open Space Strategies and localises them for Perth
and Kinross. Each priority is supported by a set of outcomes, as
shown in Table 1. Together, these provide a strategic framework to
guide LDP3 preparation, inform development management
decisions, and help prioritise Council investment and resource
allocation.
As the first OSS for Perth and Kinross, the strategy brings together
and co-ordinates a range of existing policies, strategies and
initiatives that already contribute to the delivery of these priorities
and outcomes. While not entirely new, they provide a centralised
framework through which these existing commitments can be
aligned, co-ordinated and monitored. References to the relevant
supporting strategies, policies and guidance are provided
throughout the OSS.

Page 7

Open Space Strategy 
Table 1: Strategic Priorities and Outcomes 
Priority Outcomes 
Access to quality open space – Open spaces will be planned,
designed and managed to ensure all residents can access
good-quality spaces within their local area.
Households can access a variety of open spaces within the walking distances
specified in the Council’s accessibility standards.
Open spaces meet the Council’s standards for quality and safety. 
Successful, sustainable places – Open spaces will contribute
to the creation of well-designed and sustainable places,
supporting placemaking and local living.
Blue-green infrastructure and networks form an integral element of design and
placemaking.
Open spaces positively contribute to the character and identity of places.
Blue-green networks support local living, tourism and economic vitality. 
Health and wellbeing – Open spaces will support physical and
mental health by providing accessible, welcoming and safe
environments for recreation, social interaction and
connection to nature.
Blue-green networks provide diverse opportunities for physical activity, play,
recreation and connection with nature.
Open spaces support social interaction, community cohesion and participation. 
Advancing equality and inclusion – Open spaces will be
accessible and inclusive for all users, helping to reduce
inequalities and support diverse community needs.
Open spaces are inclusive and responsive to the needs of people of all age, abilities
and backgrounds.
Open spaces, and their facilities, are co-designed and managed in collaboration
with communities. 
Nature positive places – Open spaces will protect, enhance
and connect habitats, supporting biodiversity and delivering
positive outcomes for nature.
Biodiversity is protected and enhanced across open space networks.
Habitat connectivity is strengthened across settlements and into the countryside. 
Climate change mitigation and adaptation – Open spaces will
function as nature-based solutions to climate change by
reducing emissions and increasing resilience to climate
change impacts.
Blue-green networks support a shift to sustainable travel through improved
walking and cycling connections.
Open spaces contribute to climate resilience through sustainable drainage, flood
management, cooling and shading.

Page 8

No embedded text on this page.

Page 9

How the Strategy Was Developed
An internal Open Space Strategy Working Group was established to
provide input and oversight to shape the direction of the strategy,
ensuring alignment with wider policy, service priorities and
operational considerations.
Open Space Audit
In accordance with statutory requirements an audit of existing
open space provision across Perth and Kinross was undertaken to
inform the preparation of the OSS. The purpose of the audit is to
undertake an assessment of the quantity, quality and accessibility
(i.e. spatial distribution) of existing open spaces information on the
audit. 
The audit considered all open spaces within or adjacent to
settlement boundaries identified in the current Local Development
Plan (LDP2) that were 0.2ha or larger, as well as smaller sites
considered to be of local importance. This included sites both
publicly and privately managed to get an overall picture of open
space provision across Perth and Kinross. For a specific breakdown
of the Council’s greenspace assets please refer to the Community
Greenspace Asset Management Plan (CGAMP). 
Further detail on the audit is available in the Appendices: 
 Appendix 1 – Open Space Audit Report
 Appendix 2 – Open Space Audit Results
 Appendix 3 – Open Space Audit Map
Together, these resources provide a spatial evidence base to inform
planning decisions, including the identification of developer
requirements for on and/or off-site contributions.
Engagement
A series of internal and engagement activities were undertaken in
parallel with the OSA to provide additional context, identify local
priorities, and help validate the audit findings. This included a series
of cross-service workshops to co-ordinate internal policies under
the topics covered in the OSS, as well as multiple community
engagement activities to identify current and future requirements,
including:
 Big Place Conversation. A programme Place Standard
engagement for LDP3.
 Playing Out in Perth and Kinross Survey. Online survey
targeted towards children and young people for the PSA.
 Open Space Survey. Online map-based survey to gather
information on valued open spaces and how they are used.

Page 10

Open Space Strategy 
How to Use the Strategy
The OSS is a statutory document and a material consideration in
the decision-making process. It should be used by developers,
Council officers, community groups and other stakeholders to
inform the development, maintenance and use of blue and green
infrastructure, including open spaces and wider networks.
Proposals relating to open spaces should take account of the
policies, standards and spatial analysis set out in this strategy. This
includes consideration of open space quantity, quality, accessibility
and typology, as well identified areas of deficiency and demand.
The OSS should be applied at the earliest stage of development,
including pre-application discussions, and should be used alongside
the LDP and other relevant strategies linked to throughout this
document. Where proposals depart from the standards or
recommendations in this strategy, clear justification will be
required.
In addition, the OSS provides an evidence base that can be used to
support stakeholders and partner organisations to develop, justify
and seek funding for projects that support the delivery of the OSS
priorities and outcomes.

Page 11

Open Space Strategy
Perth and Kinross is characterised by an extensive and
interconnected blue and green network that forms a defining
element of the area's environment, landscape and sense of place.
Stretching from the Cairngorms in the north to Loch Leven and the
lowland agricultural landscapes in the south, these natural assets
support biodiversity, climate resilience, recreation, active travel,
tourism and community wellbeing. The network comprises rivers,
lochs, wetlands, woodlands, parks, open spaces, habitats and
access routes that connect settlements with the wider natural
environment.
Strategic Blue Network
The River Tay and its tributaries form the backbone of the blue
network across Perth and Kinross. At approximately 193 km in
length, the River Tay is Scotland's longest river and drains a
catchment of more than 5,000 km², making it one of the country's
most significant freshwater systems. The catchment contains
around 162 water bodies, including major rivers and lochs that
support internationally important habitats and species.
Loch Leven is one of Scotland's most important wetland sites and
covers approximately 1,611 hectares. It supports internationally
significant populations of breeding and wintering waterbirds, with
up to 35,000 birds recorded during winter months. The loch is also
a major recreational asset, with the 21 km (13 mile) Loch Leven
Heritage Trail providing opportunities for walking, cycling and
wildlife appreciation.
Key blue network assets include:
 River Tay and the River Tay Special Area of Conservation
(SAC).
 River Earn, River Almond, River Isla, River Tummel, River
Lyon and River Braan.
 Loch Tay, Loch Rannoch, Loch Tummel and Loch Ericht. 
 Loch Leven National Nature Reserve and internationally
important wetland habitat.
 Wetlands, floodplains and freshwater ecosystems
throughout the authority area.
   
Blue and Green Network Overview

Page 12

Open Space Strategy 
Figure 2: Perth and Kinross Blue Network Features
Strategic Green Network
Perth and Kinross contains a diverse green network of woodlands,
habitats, parks, open spaces and protected landscapes. Woodland
is a particularly important asset, covering approximately 99,353
hectares or 19% of the total land area (National Forest Inventory,
2025), contributing significantly to biodiversity, carbon
sequestration and landscape character.
The northern part of the authority lies within the Cairngorms
National Park, the largest National Park in the United Kingdom. The
National Park contains internationally important habitats, extensive
areas of wild land, native woodlands, rivers and mountain
environments, making a substantial contribution to Scotland's
ecological network.
Key green network assets include:
 Cairngorms National Park.
 Loch Lomond and the Trossachs National Park.
 Extensive woodland and forestry estates.
 National Nature Reserves and Local Nature Conservation
Sites.
 Designated Special Protection Areas (SPAs) and Special
Areas of Conservation (SACs).
 Parks, open spaces and green corridors associated with
settlements.
 Core Paths and long-distance recreational routes.

Page 13

Open Space Strategy 
Figure 3: Perth and Kinross Green Network Features and Connections 
Importance of the Blue and Green Network
Together, these blue and green assets provide a wide range of
ecosystem services and community benefits. They:
 Support nationally and internationally important
biodiversity.
 Help manage flood risk and improve climate resilience.
 Contribute to carbon storage and climate change mitigation.
 Provide opportunities for recreation, active travel and
outdoor learning.
 Support tourism, health and wellbeing.
 Enhance landscape quality and local distinctiveness.
 Improve habitat connectivity across urban and rural areas.
The protection, enhancement and better connection of these
assets is fundamental to creating a resilient, accessible and
multifunctional open space network that continues to support
people, nature and place-making across Perth and Kinross.

Page 14

Open Space Strategy 
Quantity
The OSA’s quantity assessment identifies the current level of
provision across Perth and Kinross. An initial desk-based review of
existing spatial datasets was used to produce a baseline, this
included all LDP2 designated open spaces. Each site was visited and
pre-screened to identify a subset of spaces deemed to be public
open space (POS). The total area of POS was used to benchmark
against the quantity standard, indicating areas of sufficient
provision or where deficiencies occurred. Table 2 provides an
overview of the spaces considered in the audit.
Table 2: Overview of all open spaces considered in audit
Type No.
Sites
Total Area
(Ha)
Public open space (POS) 432 906
Open space with limited accessibility
or public functions (e.g. golf courses,
allotments, natural space with no
formal access)
480 1,996
Total 912 2,902  
Open Space Standards Quantity Standards:
 Each community should have access to public open space at a rate
of equivalent to 3.5 hectares per 1000 people. 
 The minimum amount of public open space required from new
residential developments is 80m² per dwelling house.
Quantity Policy:
If the quantity of open space within any community falls below 3.5
hectares per 1000 residents, then:
 The Council will support the provision of new public open space
and will seek to identify suitable locations and secure external
funding opportunities to deliver required provision. 
 The sale or development of Council-owned open space that would
result in the loss of these facilities will not be supported unless it
results in replacement provision of equal or greater size within the
community. 
 Development proposals that would result in the loss of open space
will only be supported where:
o replacement provision of equal or greater size and quality is
secured; 
o there is clear evidence of support from the local
community; or 
o material considerations demonstrably outweigh the need
to retain the open space.

Page 15

Open Space Strategy
Accessibility
Although the quantity benchmarking focused on populations
residing in settlements with a boundary identified in LDP2, it is
helpful to contextualise the findings at a wider authority scale. If
the total Perth and Kinross population of 150,953 (Census, 2022)
were applied to the quantity standard, the resulting POS
requirement would be approximately 528ha. The audit identified
around 906ha of POS, indicating that, at an overall level, open
space quantity comfortably exceeds the benchmark but requires an
accessibility analysis as to whether its distribution is suitable. 
An accessibility analysis was undertaken to assess the distribution
of public open spaces in relation to the population based on these
accessibility standards. The findings help to identify areas of
sufficient provision as well as where accessibility gaps may exist.
Table 3 presents a summary of the outputs across all LDP2
designated settlements. 
Table 3: Percentage households meeting accessibility standards
across LDP2 settlements 
Public
Park
(700m)
Playing
Field
(1200m)
LEAP 
(400m)
NEAP 
(1000m)
All
Settlements 84% 95% 60% 84% 
Accessibility Standards:
The accessibility standards are put in place to ensure that everyone is
within a reasonable walking distance to important areas of open
spaces. In Perth and Kinross, everyone should be within:
 700m of a public park
 400m of a Local Equipped Area for Play (LEAP) 
 1000m of a Neighbourhood Equipped Area for Play (NEAP)
 1200m of a playing field
 500m from a core path
Accessibility Policy:
 The Council will seek appropriate developer contributions from
new development proposals in locations outside the defined
accessibility catchments to ensure new residents have access to
adequate provision. 
 The Council will seek to secure additional investment to enhance
open space provision within new developments, beyond the
minimum requirements expected of developers, to address
identified deficiencies in the wider area. 
 The Council will seek to identify suitable locations and secure
external funding to address gaps in provision or connectivity, with
the aim of increasing the proportion of households meeting the
accessibility standards.

Page 16

Open Space Strategy 
Quality
A quality assessment was undertaken to evaluate the condition and
characteristics of open spaces identified as publicly accessible in
the audit. The findings identify those spaces that are performing
well and provide good value to communities, as well as those
where improvements may be required. 
Overall, only ten of the sites assessed failed to meet the required
quality standard. Table 4 sets out the number of sites that scored
less than ‘Good’ for each criterion in the assessment. A full
description of the quality criteria used in the assessment is
provided in the Open Space Audit Report. 
Table 4: Public open space quality assessment summary results
Quality Criterion % sites scoring
‘Good’ or above
Accessibility 78%
Place Quality 84%
Care and Maintenance 94%
Biodiversity 91%
Community Use 87%
Overall Quality Score 98% 
Quality Standards:
Open spaces identified as publicly accessible and included in the audit
are expected to achieve a minimum quality score of 3 (Good) or above in
the Council’s quality assessment. 
Quality Policy:
 Development proposals that enhance the functions of open
spaces and improve the quality of the site will be supported.
 The Council will seek to secure external funding to improve the
quality of open spaces that do not meet the required quality
standard. 
 Where a public open space fails to meet the quality standard and
is privately managed, the Council will take reasonable steps to
work with the responsible parties to bring the site up to the
required standard.

Page 17

Open Space Strategy
Overview of Audit Findings
A comprehensive set of settlement-level results was produced to
present the audit findings. This is accompanied by a series of
mapped spatial datasets that were developed during the process. 
For clarity and easy of interpretation, the Table 5 present a
summary of the results, focusing specifically on LDP2 settlements
and Perth neighbourhoods with populations exceeding 1,000
residents.
It is important to recognise that a range of factors contribute to
identified shortfalls in POS provision in certain settlements:
 Historic development of the settlement that did not prioritise
open space provision. This is particularly evident in Perth.
 The presence of spaces that could not be classified as POS in
the audit due to accessibility constraints or lack of clear public
function.
 Standard open space typologies do not account for the
recreational value of accessible countryside, which may lessen
demand for formal provision in smaller rural communities.
 The phased delivery of larger public open spaces in new
developments can result in temporary shortfalls following
housing occupation.
Addressing identified deficiencies remains a key priority and where
they have been identified the following approaches will be pursued:
 Safeguard existing POS provision.
 Secure appropriate on-site and off-site developer contributions.
 Pursue external funding opportunities using the OSS as an
evidence-base.
 Apply the Infrastructure First principle to ensure POS in new
developments are delivered at the earliest practical stage, taking
account of other infrastructure requirements and any
masterplanning of the site.
 Review sites identified in the audit that were not classified as POS,
and, where appropriate, improve accessibility and functionality to
make them public spaces.
 Prioritise quality enhancements to existing open spaces, and path
networks, in areas where new provision is not feasible.
 Regarding the provision of new play spaces or sport facilities,
deficiencies identified in the audit will be addressed following the
approaches set out in the Playground Strategy and Policy on
Provision of Facilities for Outdoor Pitch Sports.

Page 18

No embedded text on this page.

Page 19

Table 5: Open space audit quantity and accessibility summary: LDP2 settlements
Settlement Population
(Census 2022)
Meets
Quantity
Standard
Quantity
Shortfall
(Ha)
% Households meeting accessibility standard
Public
Park
(700m)
Playing
Field
(1200m)
LEAP
(400m)
NEAP
(1000m)
Perth 49,292 Yes  89% 99% 62% 88%
Blairgowrie 9,433 No -3.5 75% 98% 58% 70%
Kinross and Milnathort 7,606 Yes  82% 100% 69% 91%
Crieff 7,142 Yes  95% 99% 52% 89%
Auchterarder 6,061 Yes  59% 91% 62% 74%
Scone 5,232 Yes  87% 100% 43% 84%
Bridge of Earn 2,918 No -2.1 100% 100% 63% 76%
Pitlochry 2,694 Yes  87% 97% 59% 85%
Alyth 2,345 Yes  96% 99% 67% 95%
Coupar Angus 2,132 Yes  90% 99% 80% 65%
Invergowrie 1,969 Yes  88% 96% 55% 88%
Aberfeldy 1,886 Yes  94% 100% 84% 91%
Comrie 1,847 Yes  79% 98% 42% 87%
Inchture 1,565 Yes  100% 100% 55% 100%
Luncarty 1,514 Yes  94% 99% 41% 98%
Errol 1,500 Yes  100% 100% 70% 100%
Stanley 1,497 No -4 83% 95% 71% 96%
Abernethy 1,425 No -1.3 86% 96% 49% 92%
Methven 1,301 Yes  91% 100% 48% 100%
Bankfoot 1,254 Yes  88% 98% 73% 98%
Dunkeld and Birnam 1,194 Yes  97% 94% 72% 96%
St Madoes and Glencarse 1,096 Yes  92% 100% 90% 97%
Longforgan 1,079 No -1.9 57% 100% 24% 80%

Page 20

No embedded text on this page.

Page 21

Planning and Placemaking 
Until LDP3 is adopted, LDP2 and the Council’s Open Space Provision
for New Developments Supplementary Guidance (2021) and Green
and Blue Infrastructure Supplementary Guidance (2020) provide
the operative local detail on on-/off-site provision, developer
contributions and long-term maintenance requirements. This OSS
adds updated spatial priorities and standards to inform decisions
and future guidance under the new planning system.
Development Plans
The LDP’s spatial strategy will identify and protect existing BGI
assets, networks and open space facilities (including play,
recreation, sport and active travel), while also supporting their
enhancement and connectivity through new provision. This will be
informed by an understanding of current and future requirements
identified through the open space audit and community
engagement.
LDP Open Space Designations
A Designated Open Spaces (DOS) dataset will be mapped in the LDP
and identify important areas of ecological, social or landscape value
for protection. Development proposals resulting in the quantitative
or qualitative loss of these areas will not be permitted, except in
circumstances where one or more of the following apply:
a) Where the site is principally used as a recreation resource,
the proposed development is ancillary to the principal use
of the site as a recreational resource.
b) The proposed development involves a minor part of the site
which would not affect its continued use as a recreational or
amenity resource.
c) In the case of proposals involving the loss of a recreational
or play facility, the facility which would be lost would be
replaced by provision of one comparable or greater benefit
and in a location which is convenient for its users, or by the
upgrading of an existing provision to provide a better quality
facility, either within the same site, or at another location
which is convenient for its users.
d) Where a proposal would involve the loss of a sports pitch, a
playing field strategy prepared in consultation with
sportscotland has demonstrated that there is a clear excess
of sports pitches to meet current and anticipated future
demand in the area, and that the site could be developed
without detriment to the overall quality of provision.
Development proposals on designated open space that enhance
the main functions of the site (e.g., play, recreation, sport, habitat
Policies and Guidance

Page 22

Open Space Strategy 
provision) will generally be supported, particularly where they align
with community priorities identified in Community Action Plans or
Local Place Plans.
Open Space Provision for New Developments
All new development should seek to incorporate blue and green
infrastructure of a scale proportionate to the proposal. Where
appropriate, this will include public open space provision. 
Public open space requirements for new development vary
depending on the proposed class, scale and location. Generally,
contributions will be set based on the Council’s quantity, quality
and accessibility standards.
Where there exists good provision of public open space in the local
area that is accessible for new residents, there may be no
requirement for on-site provision but alternatively a financial
contribution towards improvement, accessibility and/or
management of the existing space may be sought. 
Where on-site provision is not feasible or the type of public open
space required (e.g. football pitch) has a wider catchment than the
proposed development, then the Council may request off-site
provision or financial contribution towards upgrading or expanding
existing facilities. 
Open space that counts towards the minimum requirement: 
Any space with a clearly defined play, recreation or sport function which
is accessible and can be used by members of the public. This includes
the following types of spaces:
 High quality SUDS features which are integrated with the wider
public open space provision.
 Larger areas of buffer / screen / street planting where these are
integrated with paths and cycleways. 
Open space that does not count towards the minimum requirement:
 Isolated, grassed areas which have no clear public function.
 Isolated SUDS features which are not integrated with the wider
public open space provision.
 Small areas of street planting. 
 Service strips – unless incorporated with public open spaces.

Page 23

Open Space Strategy
While the OSS does not include quantity standards for non-
residential development (e.g. employment uses, community
facilities), these will be expected to provide BGI where possible.
Requirements for non-residential developments will be determined
on a case-by-case basis, depending on the location, type of use and
the amount of demand it is expected to generate.
Design Standards
The LDP will apply these design standards to site briefs ensuring
developments contribute to sustainable placemaking through high-
quality BGI design. 
Development proposals that include new or enhanced BGI
provision must clearly demonstrate that they respond to the
following design principles:
1. Blue and Green Network Integration
Blue and green networks within the wider area will be identified at
the outset of the design process. New BGI, including public open
spaces, are located strategically to enhance and expand existing
networks, improving connectivity within and beyond the site. 
2. Landscape-led Design
Development proposals respond positively to the landscape
context of the site, with consideration given to important views to,
from and across the site. Existing significant and sensitive features
(e.g. mature trees, hedgerows, water features and paths) have
been identified, protected and incorporated into the site layout and
design.
3. Function and Purpose
Public open spaces will have clear functions within the
development and be of an appropriate size, shape and quality to
fulfil their intended purpose. These will be multifunctional and
provide opportunities for recreation, play and social interaction,
while delivering a range of ecosystem services. The function of all
landscaped areas, including street greening, will be clearly
identified on submitted plans. Small, fragmented or incidental
areas of undeveloped land will not be considered as public open
space and will not contribute to the minimum requirements.
4. Accessibility and Connectivity
Public open spaces will be safe, attractive, inclusive and accessible
to all. They will be designed in accordance with inclusive design
principles and form part of a connected network that is easy to

Page 24

Open Space Strategy 
navigate, supports active travel along nature-rich corridors through
the development and beyond.
5. Identity and Place
Public open spaces will contribute positively to local identity and
sense of place. Public art, landscape features, signage and other
design features should be used to reflect local character and create
distinctive spaces. 
6. Long-Term Management and Maintenance
Proposals incorporating new or enhanced BGI will provide effective
management and maintenance plans covering the funding
arrangements for their long-term delivery and upkeep.
Responsibilities for ongoing maintenance will be clearly identified,
including any areas proposed for adoption by the Council.
7. Planting and Species Selection
Planting schemes reflect the function, character and environmental
conditions of the site. Species selection shall be appropriate to the
location, ground conditions and anticipated climate impacts, and
shall take future maintenance implications into account. Native
species should be used where appropriate as a first principle 
8. Biodiversity Enhancement
The protection and enhancement of biodiversity have been
considered. Opportunities for habitat creation, restoration and
connectivity have been identified within both public open spaces
and private garden grounds (e.g. wildflower meadows, native and
seed-bearing trees, shrubs and hedges, swift & bat bricks and
boxes, dry stone walls, hedgehog highways and wildlife kerbs).
Habitat connectivity should be sought within and beyond the site
connecting, where possible, to wider Nature Networks.
9. Ownership and Responsibility
Private garden grounds, public open space and amenity street
planting will be clearly distinguishable through site design and
boundary treatments. Hedges and small grassed or planted areas
adjacent to properties should, where appropriate, be incorporated
into private garden ground and will not be adopted by the Council.

Page 25

Open Space Strategy
Submission Checklist
Depending on the scale and nature of the proposed development,
the Planning Authority may request the provision of one or more of
the following alongside the submission of a planning application:
 A site plan which details existing green/blue infrastructure
on the site including connections beyond the site boundary
 A layout plan indicating proposed green areas, green/blue
features and spaces and how these will connect to wider
networks beyond the site boundary 
 A landscape and planting plan detailing the proposed
planting
 Proposals for mitigating adverse impacts on existing BGI
 Arrangements for the ongoing long-term maintenance and
management of new green areas, features and spaces
Where a Landscape Plan is required, the checklist below should be
completed to facilitate the assessment of proposals against Council
standards.

Page 26

No embedded text on this page.

Page 27

Landscape and Planting Plan Checklist:
Where a Landscape and Planting Plan is required, this will include an appropriate level of detail by providing the following information: 
□ Show the location, size, typology and functions of all public open spaces. 
□ POS to be adopted by the Council must be clearly marked and distinguishable from any POS and small areas of amenity open space not to be adopted by
the Council. The number of dwellings to be built and the planning reference must be clearly marked in the title.
□ Illustrate connections to existing blue and green infrastructure, active travel networks (including off road paths) and key destinations within and beyond
the site boundary.
□ Show existing ground levels, gradients and site contours.
□ Show existing site features, including trees, hedgerows, watercourses, paths, structures and other landscape features to be retained or removed.
□ Provide cross-sections of key public open spaces.
□ Provide details of the height and slopes of any proposed mounding or recontouring of the site, with full details of all hard landscaping proposals, including
materials and installation methods.
□ Include specifications for all structures within the site, including bridges, boardwalks, retaining walls, steps, seating, public art and landmark features.
□ Where SuDS are integrated within the public space, plans should distinguish between permanent water/pond, planted wetland and various detention
scenarios for the accessible green space, ideally showing water conveyance flow directions and exceedance flow path.
□ Provide planting schemes, including details of the species, height, size, location, density and maintenance regime of trees and shrubs to be planted.
Existing and proposed vegetation should be clearly distinguished.
□ Show the location, quantity and specification of biodiversity enhancement measures such as bird and bat bricks, wildlife kerbs and hedgehog highways.
□ Provide effective management and maintenance plans covering responsible parties, inspection schedules and long-term funding arrangements for all blue
and green infrastructure.
Further technical guidance on landscaping is provided in the Open Space Provision for New Developments Supplementary Guidance.

Page 28

No embedded text on this page.

Page 29

Adoption and Maintenance of Open Space
Development proposals that include new or enhanced BGI, play or
sport facilities will provide effective Management and Maintenance
Plans covering the funding arrangements for their long-term
delivery and upkeep, and the party or parties responsible. 
Management and Maintenance Plans will be agreed prior to the
commencement of work and will usually be set out in planning
conditions. The Council`s Policy on Maintenance Options for Public
Open Spaces in New Residential Developments sets out two
options for the adoption and maintenance of public open spaces:
1. The Council adopts all public open space in new developments.
In this case the flat rate commuted sums will be paid by the
developer with no charge to the residents. Where there is a
planning requirement for exceptionally large public open space
areas, such as a country park, the Council reserves the right to
apply a site-specific commuted sum calculation for these areas.
Areas of amenity planting and small open spaces which do not
benefit the public will not be adopted by the Council. These
areas can be maintained through employing a private factor or
them remaining the resident`s responsibility. 
2. The Council will adopt only Priority Public Open Space (PPOS)
(equipped play areas, large parks, sports pitches and possibly
green corridor path links which are of importance to the wider
community) in all developments to ensure they are available to
the public and that residents are not charged for these
important public spaces. In all cases the Council must adopt
above grounds SUDS (where Section 7 agreement applies) and
they are being jointly maintained with Scottish Water (see
below). For play areas, payment of the flat rate commuted sum
will apply. For the other PPOS areas the flat rate commuted
sum per dwelling will not apply. Instead, a site-specific
commuted sum will be calculated separately, based on current
maintenance rates, and be paid by the developer. For all
remaining POS and amenity areas the developer can apply a
Development Management Scheme (DMS), subject to Council
agreement, with homeowners meeting maintenance costs of
these areas. Land title for the POS areas must be transferred to
the Owners’ Association. 
In both options, developers must transfer land title and pay the
appropriate commuted sums prior to maintenance handover for all
adopted public open space. Payment of a security deposit which is
calculated as a percentage of the commuted sum is also required to
ensure that all public open space meets Council standards prior to
adoption. 
Where there are opportunities for community management such as
allotments, amenity woodland or sports pavilions, this is

Page 30

Open Space Strategy 
encouraged and arrangements with the Council such as a Licence to
Occupy can be applied. 
Please refer to the Council`s Flood Risk Supplementary Guidance
for information on the vesting of SuDS features. Note that site
specific commuted sums may apply.
Private Maintenance Arrangements
Although developers can opt for private arrangements for some
areas, Council adoption of all public open space within a
development is preferred as it is a simpler process. It also has the
benefit that after adoption, developers and residents are relieved
of all future maintenance responsibilities which will be attractive to
all prospective house purchasers. Private maintenance
arrangements will be secured using enforceable robust planning
conditions and obligations.
Commuted Sums
To ensure clarity for developers, the Council`s standard commuted
sum for play areas and public open space are set out in Table 6
below. All figures above are based on the current maintenance
costs for 2026/27 however the commuted sums will be uplifted
annually on 1 April in line with the retail price index (RPI). The
appropriate commuted sums will be applied at the time of
adoption. Full detail is provided in Policy on Maintenance Options
for Public Open Spaces in New Residential Developments 
Table 6: Commuted sums
Public Open Space Area Commuted Sum
Amount (2026/27
figures)
Public Open Space Adoption (in
addition to separate commuted sums
for play areas)
POS £1,122.00 per
dwelling 
Play Area adoption LEAP: £91,886.00
NEAP: £115,025.00
Additional facilities within major
developments (e.g., changing
pavilions, skate parks, allotments)
This will be calculated
on a site-by-site basis

Page 31

Open Space Strategy
Play
Play is essential for the development of children and young people,
supporting their physical, cognitive, and emotional well-being. It
fosters learning, creativity, and social skills, playing a crucial role in
ensuring a healthy childhood. 
Perth and Kinross Council (PKC) acknowledges that access to play
opportunities is a fundamental right, as outlined in Article 31 of the
UN Convention on the Rights of the Child. Furthermore, recognising
the significant benefits of play, the provision of high-quality play
experiences is a key element in fulfilling the Corporate Plan priority
of enabling our children and young people to reach their full
potential. 
Play Sufficiency Assessment
In accordance with the Town and Country Planning (Play Sufficiency
Assessment) (Scotland) Regulations 2023, a Play Sufficiency
Assessment (PSA) was prepared during the preparation of the
Evidence Report for the Local Development Plan (LDP). The PSA
included statements and maps regarding the quantity, quality and
accessibility of play spaces. This was incorporated into the open
space audit and provides an evidence-base for planning decisions,
including the preparation of the LDP and delivery of National
Planning Framework 4 Policy 21 on Play, Recreation and Sport.
Playspace Standards and Guidelines for Developers
We require developers to provide space for play as an integral part
of the design of a housing development. In creating an estate for all
age groups, designers and planners must consider the pattern of
streets, paths, and open spaces from the child’s viewpoint,
incorporating opportunities for both formal and informal play.
The Council requires all housing developers to make sufficient
provision for play within their development according to standards
set out in the Playground Strategy. A full list of the Council’s play
space standards is available on PKC’s Play Areas webpage. These
standards apply to all new play facilities, whether they are intended
to be adopted or privately managed, and will be enforced using
robust planning conditions and agreements. 
On-site provision or off-site contribution
Developers should liaise with the Community Greenspace service at
an early stage in the design process to identify site requirements.
The Council will provide the developer with an analysis of existing
play provision in the vicinity and the requirements for playspace
within the new development, or whether an off-site contribution is
acceptable.
The indicative threshold that would trigger the development of a
new play facility is reaching approximately 50 residential units

Page 32

Open Space Strategy 
within the settlement. Where smaller developments require a
NEAP/REAP which will largely serve the existing population, the
Council may contribute to its delivery. 
In areas where several developments are being delivered at the
same time, a new play facility may be delivered through shared off-
site contributions and commuted sums between developers.
Developer Contributions and Maintenance Options for Play
The Council will seek to adopt play areas in new developments to
ensure they are available to the public and that residents are not
charged to use these facilities. This is a simpler process and has the
benefit that after adoption, developers and residents are relieved
of all future maintenance responsibilities which will be attractive to
all prospective house purchases. 
The Council’s standard commuted sums (2026/2027) for play areas
are set out below. Commuted sums are calculated to be the
equivalent to annual maintenance over a 20-year period. Where
play areas are adopted, the commuted sum includes a contribution
to the replacement cost within that 20-year period.
 LEAP - £ 91,886.00
 NEAP/REAP - £ 115,025.00 
Figure 4: Positive example of a well-designed play area

Page 33

Open Space Strategy
Physical Activity and Sport
Physical activity and sport play an important role in creating places
where people can live healthy, fulfilling, and productive lives.
The Physical Activity and Sports Strategy 2023-2028 (PASS) sets out
how physical activity and sport will contribute to our Corporate
Priority of supporting and promoting physical and mental
wellbeing.
Our vision for the future of physical activity and sport in Perth and
Kinross is:
We will support everyone’s physical and mental wellbeing
through physical activity and sport.
Through the development of high-quality open spaces and
networks, the OSS supports the delivery of the Council’s vision for
physical activity and sport, and aligns with the strategic priorities of
the PASS:
 We will improve everyone's health in Perth and Kinross
through increased participation in physical activity.
 We will increase the levels of activity for children and young
people, particularly those who currently don't meet the
recommended levels of participation.
 We will reduce the inequalities and barriers which stop
people participating in physical activity and sport.
 We will reduce carbon emissions generated from facilities
and make physical activity part of our Climate Change
response.
 We will support our community-led clubs, sports hubs and
networks to flourish and strengthen collaboration between
all partners in physical activity and sport.
 We will support our community-led clubs and networks to
improve sports pitches and other facilities to promote
participation and inclusivity.
 We will make physical activity and sport part of
Placemaking, so our public spaces are activity-friendly,
inclusive and fun.
Policy on the Provision of Facilities for Outdoor Pitch Sports
The Council’s Policy on Provision of Facilities for Outdoor Pitch
Sports (2017) ensures the effective and efficient management of
Council facilities for outdoor pitch sports for present and future
needs. Community management is encouraged where appropriate;
however, within public parks, the wider public interest must be
assured.

Page 34

Open Space Strategy 
The policy provides the latest information on pitch supply and
demand, but it is recognised that targeted engagement with groups
is required to assess future demand. All sports using outdoor
pitches provided by the Council are considered by the policy,
football and rugby being the most popular, with most of the
Council’s grass pitches in parks used for this purpose. For all sports,
there are adequate pitches to meet current demand, although
quality is variable and new or improved changing facilities are
required in many locations. To maximise use of these facilities, we
encourage clubs to co-ordinate shared use and co-operate over
securing improvements, where required.
The policy identifies a growing demand for the provision of floodlit
synthetic turf pitches (STPs), particularly for training, sports
development and for matches when available and/or when grass is
unplayable.
Sports Provision and New Housing Development
Development Management works with other sections to secure
appropriate new facilities, or contributions for facilities, from major
housing developments. The Fields in Trust quantity standards for
grass provision and sportscotland Facility Planning Model for
synthetic turf pitches (STPs) can be used as a reference for securing
new facilities. New MUGAs, STPs or pavilions (other than at
schools) will be secured according to need and on the basis that
communities will manage and maintain them. In some locations
new pitches with changing facilities may replace existing
substandard facilities. Information from football clubs indicates
that they want to develop new or improved pavilions within at least
nine park pitches. To date, separate outdoor grass and STP facilities
for school and community use have been provided (except at
community campuses). The Council is now seeking ways to ensure
that school and community teams can share facilities, especially
STPs.
Contributions towards sport provision are required on a larger
catchment basis according to the need within the community and
should be a shared facility with schools where appropriate.
Contributions are required more frequently than new provision, but
where there is no provision (or limited poor quality provision)
within the area, new on-site provision may be required from major
developments.
Where sport provision/contributions are likely to be required,
approaching local sport groups and Live Active Leisure’s Sports
Development Team can help inform the developer and authority
about demand for additional facilities or the possibility of
upgrading existing ones. Clearly, the local aspirations must be
balanced with the demand arising from the new development
where the future residents cannot be consulted in advance.

Page 35

Open Space Strategy
Community Food Growing
The Perth and Kinross Council Food Growing Strategy (2021) (FGS)
sets out to increase the provision of allotments and community
food growing. 
The FGS was written under the legislation of Part 9, Section 119 of
the Community Empowerment (Scotland) Act 2015. It identifies
land in its area that the local authority considers may be used as
allotment sites, identify other areas of land in its area that could be
used by a community for the cultivation of vegetables, fruit, herbs
or flowers, describing how, where the authority is required to take
reasonable steps to increase the provision in its area of allotments
or other areas of land for use by a community for the cultivation of
vegetables, fruit, herbs, flowers and containing such other
information as may be prescribed. 
The main purpose of the FGS is to help ensure that more people
will want to grow their own food and can do so. Our vision is for: 
People across Perth and Kinross to have more opportunities and
be better skilled at growing their own food, thereby leading
healthier, more sociable and sustainable lives. 
The OSS supports the delivery of the FGS’s vision and objectives by:
 Identifying potentially suitable land through the open space
audit.
 Supporting the delivery of new growing spaces through the
development and management of open spaces. 
New Growing Spaces
Local Authorities are required to identify potentially suitable land
for allotments and community growing areas where there is proven
demand. 
The demand for new allotment sites has been identified through
the FGS consultation process and further engagement with
communities with a recognised high demand. The Annual Allotment
Report 2024-2025 identifies high demand that has not yet been
addressed in Crieff and Coupar Angus.
Within New Developments 
The Local Development Plan will seek to identify land within future
development sites for community food growing and allotments,
particularly where there is a proven demand. The Planning
Authority will generally be supportive of development proposals
that include opportunities for community food growing or
allotments, granted appropriate arrangements are provided for
their long-term management and maintenance.
Due to the history of orchards in Perth and Kinross since the
monasteries owned and farmed the Carse of Gowrie in the 12th
century, the Council supports planting and management of fruit

Page 36

Open Space Strategy 
trees or small orchards in suitable locations where community
groups have shown interest and are able to maintain them. PKC will
continue to encourage large housing developments to plant
community orchards for the benefit of people and nature and to
provide locally grown fruit. 
On Council Owned Land 
Repurposing appropriate publicly owned amenity green spaces,
parks and vacant & derelict land is another solution to providing
new growing areas, the latter being supported by those who
responded to the stakeholder survey. Council ground has already
successfully been repurposed for allotments in Letham, Tulloch and
Craigie. Local consultation would be required prior to any sites
being repurposed, particularly with nearby residents. 
The Council’s Open Space Audit identifies public and private open
spaces that may be suitable for the development of food growing
opportunities, although further assessment work would be
required using the site assessment criteria in Appendix 1 of the
Food Growing Strategy.
On Private Land 
Landowners may agree, if approached, to appropriate areas being
used formally, or informally, for community growing. The
temporary use of sites for community growing is supported by the
Council and can allow for flexibility and/or testing project ideas. To
safeguard the security of the project however, it is recommended
that arrangements are formalised with the owner (e.g. through a
lease for an agreed period). Groups should contact the Council at
the outset to confirm that the site is not contaminated and
establish whether planning permission would be required. 
Garden Sharing 
Garden sharing can be initiated by anyone, whether they own a
garden that they cannot maintain, or are looking for a space to
grow fruits and vegetables. Your Community Council may be able to
help you start a local garden sharing scheme. 
Alternatively, you can join Lend and Tend, a UK wide network for
garden sharing. The platform is free to use, and you can sign up by
filling in a simple form. Once you are matched with someone who is
happy to lend their garden, you can meet up to discuss your
expectations and set the ground rules before starting garden
sharing.

Page 37

Open Space Strategy
Outdoor Access and Active Travel
Perth and Kinross offer many opportunities to get out and enjoy
the outdoors, to walk, cycle, ride or paddle down rivers and camp
overnight. The countryside is also a home and workplace to people
and wildlife, and it is important that we understand our
responsibilities and respect the interests of other people whether
acting as a land manager or as an access taker.
The right to take responsible non-motorised access in Scotland
is provided for by the Land Reform (Scotland) Act 2003 (LRA). The
Scottish Outdoor Access Code (SOAC) has been produced to explain
what is meant by responsible access in many situations for both the
'access taker' and the 'land manager'.
Not all land is within access rights, exceptions include gardens,
school playing fields and growing crops. 
Mobility Strategy
The Council’s Mobility Strategy guides the movement of people and
goods across the area. It sets the strategic direction for the
transport planning, supporting coordinated project delivery and
external funding applications. 
Ensuring development aligns with the standards set out in the OSS
and applies the BGI principles of multifunctionality and connectivity
will support the delivery of the Mobility Strategy’s Transport
Planning Objectives, including:
 Reducing transport-related CO2 emissions by increasing and
improving active travel opportunities.
 Achieving increased active opportunities to and from new
developments.
 Improving safety for all users
 Improving physical and mental health
 Improving air quality 
Core Paths and Rights of Way
The Council maintains a Core Path Plan (2017) as required by the
Land Reform (Scotland) Act 2003 that identifies a system of paths,
2043km in total, which provide reasonable public access to the
outdoors across Perth and Kinross.
The Plan includes paths which are:
 rights of way;
 functional link paths within & between communities
including selected footways (pavements), quiet roads and
promoted cycle routes;

Page 38

Open Space Strategy 
 existing popular and promoted paths;
 upland & forest paths;
 routes to mountains and other points of public interest;
 longer distance routes such as the Cateran Trail;
 routes to access inland water.
Together these routes form integral elements of local and strategic
green networks across Perth and Kinross and beyond. They provide
opportunity for active travel, habitat connectivity and connections
to nature.
Safeguarding Access Rights
The Local Development Plan identifies and safeguards access rights
and core paths, including active travel routes. These should be
incorporated within the design and landscaping of any proposed
development, ideally avoiding the need for any permanent
diversion. If there is any proposal to alter a route of an existing core
path or right of way a further legal procedure is required, and any
proposed diversion should be to as good a standard or a
betterment of the existing route.
The granting of planning permission does not stop the continued
right of public access along the existing core path or right of way.
An order under the Town and Country Planning (Scotland) Act
1997, Section 208 or an amendment of the Core Path Plan under
the Land Reform (Scotland) Act 2003 should be sought. 
If a temporary diversion of a core path or right of way is required to
facilitate works, the PKC Community Greenspace space should be
contacted via OutdoorAccess@pkc.gov.uk. 
Section 208 of the Town and Country Planning (Scotland Act 1997)
provides for the stopping up and diversion of core paths and rights
of way where necessary to enable the development to be carried
out in accordance with planning permission. The process allows a
period of 28 days for any objections or representations to be made
to proposed stopping up and diversion orders.
If you are prevented from exercising your right of responsible
access by an obstruction, such as a locked gate, intimidating sign or
person, you may wish to report the situation for investigation. In
which case you should make a general enquiry report and include:
 an accurate description of the location of the obstruction,
including map-based grid reference if possible
 Date of obstruction, photograph possible and your contact
details
Contacting the Perth and Kinross Outdoor Access
Forum, representative bodies and local community groups is also
encouraged where access rights have been affected.

Page 39

Open Space Strategy
Developing the Path Network
The Planning Authority will generally support proposals that deliver
new, enhanced or improved active travel infrastructure, particularly
where these integrate blue and green infrastructure and nature
rich habitats to a network of green corridors. Design must be
integrated into development proposals and deliver multiple
benefits, including, where appropriate, the provision of informal
and incidental play opportunities. Proposals should expand and
improve access opportunities that link into wider blue and green
networks. 
Proposals for residential development should identify routes to
local schools and include an assessment of the extent to which
these routes provide safe and easy access between the
development and the education facility.
The Local Development Plan will identify proposed routes and seek
opportunities to deliver projects identified in the Active Travel
Prioritisation Delivery Plan. This includes long-distance off-road
shared paths linking settlements that form an integral part of
strategic green networks in the region. 
Figure 5: Open spaces are designed to create green links and are aligned with key
pedestrian routes (by Barton Willmore & Urban Union)

Page 40

Open Space Strategy 
Visitor Destinations and Management
Visitor destinations and visitor management are integral to
supporting a sustainable, high-quality tourism offer across Perth
and Kinross. The area’s natural assets, parks, countryside sites and
path networks play a key role in attracting visitors, supporting the
local economy, and providing a positive experience for both
residents and visitors. 
The OSS supports the ambitions of the Tourism Strategy and Action
Plan 2025-2030 by recognising open spaces as essential tourism
assets and by promoting approaches to visitor access, dispersal and
management that protect environmental quality, enhance place
identity, and ensure that increased visitation is accommodated in a
way that is sustainable, inclusive and beneficial to local
communities. 
Through the development, management and use of the blue and
green networks across Perth and Kinross, the OSS will support the
Tourism Strategy’s vision: 
By 2030, tourism will play a greater role in Perth and Kinross by
supporting an inclusive, international and connected visitor
economy. 
Through cross-sector collaboration and partnership, the OSS seeks
to support the delivery of the Tourism Strategy’s strategic
objectives listed below by providing enhanced opportunities for
year-round, nature-focused tourism. 
Strategic Objectives:
 Area promotion and destination marketing: Aim to drive up
visitation to our area from identified audiences, increasing day
visitors and overnight stays, as well as the length of stay and
visitor spend
 Investment and infrastructure: Aim to attract inward
investment to enhance the visitor experience in the destination,
as well as manage the impact on our communities
 Market development and internationalisation: Aim to build on
investment to date in key assets, developing new tourism
products and visitor experiences
 Industry growth and resilience: Aim to develop a sustainable
visitor economy through supporting businesses to grow,
increase levels of well-paid jobs and build their resilience in a
challenging operating environment
Key assets that attract visitors include our:
 Premier Parks – high-quality destination parks offering
recreation, visitor facilities, and access to nature.
 Countryside Sites – managed natural areas providing
opportunities for outdoor recreation and experiencing the
natural environment.
 Scotland’s Great Trails – Nationally recognised long-distance
routes showcasing Scotland’s landscapes, natural heritage, and
outdoor recreation opportunities. 
 National Cycle Network – the UK-wide network of signed paths
and routes for walking, wheeling, cycling and exploring
outdoors.

Page 41

Open Space Strategy  
Figure 6: Key visitor destinations

Page 42

Open Space Strategy 
Biodiversity
Perth and Kinross Council has a legal duty to conserve and enhance
biodiversity. Working together across all our services, we are
developing the best ways to do this and, at the same time,
contributing to other policies and initiatives.
Under the Nature Conservation (Scotland) Act 2004, all public
bodies in Scotland have a duty to further the conservation of
biodiversity when carrying out their functions. The Council is
involved with a range of initiatives to protect, restore and enhance
biodiversity through the management of open spaces many with
the Tayside Biodiversity Partnership. Further information on the
Council’s work is available in the latest Biodiversity Duty Report
that can be accessed on the Council’s Enhancing Biodiversity
webpage.
Biodiversity in New Developments 
Detailed ecological survey is required in the form of an Ecological
Impact Assessment (EIA). Impact assessments are required for
habitats, species, and existing trees on site including the impact of
new artificial lighting. 
Submissions must include evidence of application of the mitigation
hierarchy of avoid, reduce, compensate for losses, and enhance. All
developments should aim to avoid adverse impacts in the first
instance, see the PKC Planning for Nature Guidance section 5.1.
Planning Guidance - Planning & Biodiversity - Perth & Kinross
Council (pkc.gov.uk) 
Conclusions from the ecology surveys and requirements detailed in
the PKC Planning for Nature Supplementary Guidance should be
used to create a Site Biodiversity Action Plan containing quantities,
locations, techniques, timescales, and monitoring arrangements. 
To satisfy NPF4 Policy 3, in Major planning applications we request:
 Integrated swift bricks in 25% of two storey homes
 Integrated bat bricks, boxes and tubes in 25% of two storey
homes
 Wildlife kerbs and amphibian ladders installed adjacent to
all road gullies within 500m of a SuDS Pond.
 Hedgehog highways by providing access gaps in wooden
fences 13cm x 13cm at ground level.
 Low lux-level downward facing development lighting
directed away from hedgerows, treelines and woodland
 Creating new and connecting existing habitats to contribute
towards nature networks. 
 Ponds, swales or rainwater gardens designed with
biodiversity in mind.

Page 43

Open Space Strategy
A checklist of information required to inform a planning application
regarding biodiversity is provided in Annex 4 of the PKC Planning
for Nature Supplementary Guidance.
Along with private development, the Planning Authority work with
services across the Council to ensure biodiversity is protected and
enhanced through any upgrading and new build Council projects.
Trees, Woodlands and Forestry in New Developments
Trees, woodland and forestry are opportunities in development
and can add asset value for years to come. Early engagement with
an Ecologist and competent Arboricultural Consultant allows trees
to inform the layout allowing more to be retained and incorporated
into plans. 
Existing woodland, trees and hedgerows should be protected,
restored and expanded to connect to other habitats. The mitigation
hierarchy of avoid, reduce and compensate should be followed to
reduce impacts of development to woodland, trees and
biodiversity.
Clearing proposed sites pre-emptively prior to applying for planning
permission has increased over the last decade and is against NPF4
Policies. Clearance of development sites should only begin when
construction of the approved proposal is about to commence.
NPF4 Policy 6 aims to protect and expand forests, woodland and
trees by ensuring existing woodlands and trees are protected, and
cover is expanded and woodland and trees on development sites
are sustainably managed. NPF4 requires planning authorities to
prepare a forestry and woodland strategy which identifies
woodlands of high nature conservation value (WHNCV) within the
planning authority’s area.
Proposals that will result in loss of WHNCV will not be supported
while proposals that will protect, restore, enhance and connect
WHNCV will be supported.
Tree Planting Policy
This Council’s Tree Planting Policy sets Council-wide standards and
procedures for tree planting on all Council-owned Land and is
aimed at all Council staff or volunteers planting trees on Council
land. A consistent and well-planned approach enables efficient use
of available resources to achieve the Council’s aims to improve
Biodiversity through increased canopy cover, carbon sequestration
and ecological improvements as well as improving public health
and wellbeing and the amenity value of our greenspaces. To ensure
that the right trees are planted in the right place, the policy
provides guidance on appropriate planting stock, technique,
protection and maintenance for different locations. 
Nature Networks
Nature Networks play a critical role in protecting, enhancing and
connecting habitats. The Council has a responsibility to safeguard

Page 44

Open Space Strategy 
and strengthen these networks through the planning process, land
management and partnership working. This includes protecting
existing assets, addressing fragmentation, and promoting
enhancement and restoration. 
LDP3 will identify Nature Networks and seek opportunities to
enhance and expand them through new development. Developers
will be required, where appropriate, to contribute to nature
networks. Where possible, these will link with urban green
networks and increase opportunities for communities to
responsibly access areas of high nature value.
Sustainable Urban Drainage Systems (SuDS)
In line with Scottish Water guidelines and the Council`s Flood Risk
Supplementary Guidance, Sustainable Urban Drainage Systems
(SuDS) should make a positive wider contribution to the quality of
blue-green networks in new developments. 
SuDS are a soft-engineering solution that manages rainwater and
potential flooding within the landscaping and greenspaces of a
development, contrary to traditional hard engineering approaches.
It aims to create multi-functional landscapes that deliver multiple
benefits for water management, amenity and biodiversity. The
Council is committed to this approach and to maximising the
multiple benefits of SuDS. 
SuDS should be:
 considered from the outset, with enough land allocated for
them within the site. Submissions should clearly reflect how the
water & drainage strategy has influenced the design approach
taken for the site.
 a network of detention features which connect to the wider
green and blue infrastructure (rather than only a single feature).
Consider different types of SUDS such as ponds, basins, green
roofs, swales and rain gardens. These should ideally be naturally

Page 45

Open Space Strategy
linked, providing connectivity for people and wildlife within and
through the site.
 located at suitable topographic locations, integrated with other
public open space types wherever possible and safely designed
to co-exist with activity areas (e.g. playgrounds, sport
pitches).SuDS that are isolated and/or provide little amenity
value will not be considered part of the public open space
contribution.
 accessible and biodiverse, with suitable planting around the
edges to maximise their ecological value and also allow for an
economical maintenance regime.
The Open Space Supplementary Guidance (2021) includes technical
guidance on sustainable drainage in Appendix 2.
Bioretention areas
Smaller SuDS features can be incorporated with streets and can
substitute traditional shrub beds and single function amenity
planting. They typically consist of shallow depressions of different
shapes and sizes that drain surface water runoff and encourage
infiltrations into the ground. Bioretention features can be ideal
solutions for compact, high-density sites with limited space. Further
design guidance and specifications for soakaways including planting
are provided in the Perth and Kinross Open Space Supplementary
guidance. 
Swales 
Swales and basins can be various shapes and sizes and can be
integrated with informal amenity areas. Linear swales which are
ideal for narrow spaces such as linear open space corridors, road
verges and structure planting on the edge of developments. Further
design guidance and specifications for swales including planting are
provided in the Perth and Kinross Open Space Supplementary
guidance 
Channels and rills
Canals and rills are encouraged, these are open surface water
channels with hard edges, that water flows along, and they can
have a variety of cross sections to suit the urban landscape,
including the use of planting to provide both enhanced visual
appeal and water treatment. 
Ponds and basins  
Ponds and basins are encouraged, and providing access to SuDS
features for larger vehicles is often necessary in order to allow for
their long-term maintenance. However, gravelled roads which
surround basins and ponds can take away from their natural
appearance. `Green access tracks` are ideal for access that is
infrequently used, they are unobtrusive and blend in with the wider

Page 46

Open Space Strategy 
amenity area. Green tracks and paths can become part of the
drainage system and facilitate water retention. Further guidance is
provided in the Open Space Provision for New Developments
Supplementary Guidance Supplementary Guidance. 
Community Involvement
Community Greenspace supports a network of 118 community
groups who are involved to a greater or lesser extent in the
management of open space. Groups are locality based and include
bloom groups, paths groups, friends of cemeteries, biodiversity
focussed and other groups. There are many benefits to this:
 Greater community engagement in the management of
these spaces
 Voluntary action to maintain and improve these spaces
 Match funding and design input for site improvement
projects
 Benefits for the individual through the above, and for
physical/mental health and wellbeing.
Events and Commercial Use of Open Spaces
Events and Commercial use can add functionality, engagement and
economic benefits to our open spaces. Sustainably managing open
spaces to provide these opportunities can improve local living,
support tourism and stimulate economic growth. 
The Council makes parks and other greenspaces available through a
booking process and works with event organisers, other agencies
and stakeholders to ensure events are safe, legal and appropriate in
the context of that space, in the context of its other functions
throughout the year. 
The Council may grant permission to catering vans and mobile
traders looking to operate in parks and countryside sites. Traders
must adhere to the standard code of conduct in order to operate
on Council greenspace sites. 
Contact parkevents@pkc.gov.uk for booking enquiries or for
guidance on how to trade in a park or countryside site.
Signage within Open Spaces
Signage in open spaces offer contact between users and those
responsible for the management and maintenance of that site. 
The Council has signage at the entrance to countryside sites &
premier parks. They also include new signage with the upgrade of
existing play areas.

Page 47

Open Space Strategy
For Premier Parks and Countryside Sites signage at entrances
generally include:
 Information about what can be found within the site;
 A directional map to help with navigation; and
 Information about other places of interest in the local area.
 Dementia friendly signage at MacRosty Park, Crieff 
Other signage found within Council sites may include:
 Core path directional signage
 Water safety information
 Other small informational signage e.g. no dog fouling
Burial Grounds
Perth and Kinross Council manage and maintains 176 burial
grounds across 132 locations, ranging from large active cemeteries
serving urban communities to historic rural churchyards and closed
burial grounds of significant heritage value. These sites form an
important part of the wider open space network, providing
accessible greenspace, contributing to local landscape, supporting
biodiversity, preserving cultural heritage and offering places for
quiet reflection.
Responsibility for these assets sits within Community Greenspace,
including Bereavement Services. Bereavement Services oversees
the operational management, maintenance and administration of
all council-owned burial grounds, ensuring they are maintained in a
safe, dignified and sustainable manner, in line with all relevant
legislation, guidance and best practice. In addition, Bereavement
Services manages Perth Crematorium, further supporting the
delivery of comprehensive burial and cremation services across the
Council area. There is also one privately operated burial ground in
Perth and Kinross. 
Burial grounds remain valued community assets, providing places
of remembrance, reflection and cultural significance for residents
and visitors and the Council recognises both its statutory and moral
responsibility to care for them to a high standard.
The Council’s Future Cemetery Provision Strategy highlights the
need to maintain sustainable burial capacity, particularly in
communities where capacity may fall below ten years. Burial
provision should therefore be planned not only as an operational
requirement but as an integral component of Perth and Kinross’s
wider green infrastructure network.
Cemeteries and burial grounds make a valuable contribution to the
Open Space Strategy by providing accessible, multifunctional
greenspace that supports community wellbeing, quiet reflection
and local identity. They also protect historic landscapes, enhance
biodiversity, contribute to tree canopy cover and support climate
resilience.

Page 48

Open Space Strategy 
Many sites incorporate mature trees, grassland habitats and
heritage features, offering significant environmental, visual and
cultural value. Within settlements, they function as informal
greenspaces, while in rural areas they often represent important
publicly accessible land and ecological corridors. Community
engagement plays an important role in the stewardship of these
spaces. “Friends of Cemetery” groups and similar local initiatives,
including activities such as grow-wild trails, contribute positively to
site management, biodiversity enhancement and public
appreciation. These groups support community ownership,
encourage volunteering and help strengthen the role of burial
grounds as valued local greenspaces.
Future cemetery provision will adopt a proactive, plan-led approach
to ensure long-term capacity. New or extended burial sites should
be integrated with green infrastructure planning, protect landscape
character, enhance biodiversity and improve accessibility and
connectivity. Opportunities for woodland, natural and
environmentally sensitive burial practices will be supported where
appropriate.
Burial grounds also play an important role in delivering biodiversity
and climate objectives through habitat creation, pollinator-friendly
planting, native tree establishment and low-intensity land
management. These benefits will be balanced alongside
operational needs, visitor expectations and heritage considerations.
Many cemeteries contain features of historic and cultural
significance, contributing to the area’s historic environment and
community identity. Their continued conservation and sensitive
management are essential.

Page 49

Open Space Strategy
Asset Management
The Community Greenspace Asset Management Plan (CGAMP)
provides the operational framework for managing Perth and
Kinross Council’s extensive portfolio of greenspace assets, including
around 520 hectares of grassland, 32,000 trees, 145 play areas, 159
bridges and over 8,200 infrastructure assets such as benches, litter
bins, signs and picnic tables. The estimated net book value of these
assets was £7.59 million in 2023.
A key feature of the plan is the use of an Asset Challenge process
that assesses assets against condition, suitability, utilisation, value
for money and climate change considerations to inform investment
decisions. The plan includes a funded six-year capital programme
and identifies a potential 30-year investment requirement of
approximately £128.8 million to maintain the current greenspace
asset base and service standards. The plan also highlights the
important role of community groups and volunteers, who
contribute more than 25,000 hours annually to the maintenance
and enhancement of local greenspaces.
The Community Greenspace Asset Management Strategy (2023–
2029) (CGAMS) sets out PKC’s approach to managing, maintaining
and enhancing its greenspace assets to support healthy, sustainable
and resilient communities. 
The strategy is aligned with the Council’s Corporate Asset
Management Framework and is guided by the vision of “Working
together to maintain, improve and promote our shared spaces for
all to enjoy.”
Delivery is structured around four key principles:
 Collaborating with communities and volunteers to improve
wellbeing, encourage participation and support community-
led greenspace projects.
 Maximising shared opportunities through partnership
working, coordinated investment and improved access to
greenspace assets.
 Enhancing sustainability and biodiversity by promoting
nature recovery, sustainable management practices, native
planting and climate resilience.
 Applying lifecycle management and proactive maintenance
to ensure greenspace assets remain safe, accessible and fit
for purpose over the long term.
The CGAMS and CGAMP provide an important evidence base for
the OSS and support its delivery. While the OSS focuses on
assessing wider provision and requirements, the CGAMS and
CGAMP establish the corporate framework for managing,
maintaining and investing of PKC’s greenspace assets in the long-
term. The priorities and policies within the OSS will therefore
complement and help inform the future implementation of PKC’s
greenspace management and investment programmes.

Page 50

Open Space Strategy 
Current Requirements
The evidence base gathered through the open space audit and
engagement activities highlights a number of requirements for the
existing open space network. Key requirements are to:
 Safeguard existing open space provision, including
approximately 70 hectares of undesignated POS identified
through the audit.
 Improve the quality, accessibility and functionality of open
spaces so they can support a wider range of recreational,
sporting, play, social and environmental functions for all user
groups.
 Expand active travel opportunities within green networks,
ensuring communities have access to green corridors that
facilitate walking, wheeling and cycling through settlements and
into the wider countryside.
 Strengthen management and maintenance arrangements,
particularly in the context of resource constraints and ageing
infrastructure.
 Support collaborative management approaches with
communities and secure investment to deliver local priority
actions and projects. 
Future Requirements
Looking ahead, the strategy must also plan for future growth,
climate challenges and evolving community needs. Key
requirements are to:
 Integrate good-quality, multifunctional blue-green networks
into new development, ensuring open space standards are met.
 Support local living by ensuring active travel opportunities are
integrated with blue-green networks.
 Deliver nature-positive outcomes through habitat creation,
biodiversity enhancement and connections to nature networks.
 Improve climate resilience through measures such as urban
greening, sustainable drainage (SuDS), shading and flood
management measures.
 Ensure the long-term sustainability of open spaces through
effective maintenance arrangements, partnership working and
community involvement. 
Current and Future Requirements