Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure 
Date of Meeting: 26 August 2026 
Report Title: Perth and Kinross Open Space Strategy Draft 
Report Number: 26/223 
Report Author: Dante Sosa, Planning Officer, Development Plans
Team 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 The report presents the draft of the first Perth and Kinross Open Space
Strategy (OSS) which will provide a strategic framework for the Council’s
policies and proposals for the development, maintenance and use of green
infrastructure, including open spaces and blue-green networks. 
1.2 The purpose of the OSS is to: 
• Set out the Council’s quantity, quality and accessibility open space
standards.
• Present the findings of the open space audit benchmarked against those
standards, identifying areas where new or enhanced provision is required.
• Identify areas of public open space to be safeguarded from development
in the Local Development Plan 3 (LDP3).
• Inform Development Management planning application decisions which
will include proposals relating to designated open space or where new
open space provision is required.
• Help embed blue-green infrastructure principles into future development.
• Provide an evidence-base for external funding applications.
• Support the delivery of wider policy objectives. 
1.3 This first OSS for Perth and Kinross is prepared in fulfilment of the updated
requirements under the Planning (Scotland) Act 2019 and National Planning
Framework 4 (NPF4). 
1.4 The report seeks approval to proceed to public and key stakeholder
consultation and engagement.

Page 2

1.5 Sections 
1. Purpose
2.  Recommendations
3. Background / Main Issues
4. Conclusions
5. Impact and Value Assessment
6. Appendices 
2.  Recommendations 
2.1 It is recommended that the Committee: 
• Agree the Vision statement set out in the Open Space Strategy.
• Approve the draft Open Space Strategy in Appendix 1 to proceed to public
and key stakeholder consultation and engagement. 
3. Background / Main Issues 
Context 
3.1 Open space plays a key role in supporting the environmental, social and
economic wellbeing of settlements across Perth and Kinross. Parks, green
corridors, sports pitches, natural spaces and civic spaces contribute towards
public health, biodiversity, climate resilience and sustainable placemaking.
They also support active travel, community cohesion and the attractiveness of
settlements as places to live, work and invest. 
3.2 Figure 1 illustrates the broad components covered by the OSS. While “open
space” has a specific definition in planning policy, for the purposes of this
strategy the term is used as an overarching concept encompassing open
spaces, green spaces, green infrastructure, blue infrastructure and the blue-
green networks that connect them. The Strategy therefore adopts a holistic
approach, recognising that the value of open space extends beyond individual
sites to include the wider green and blue assets and connections that support
sustainable, nature-positive and healthy places. 
3.3 New duties on planning authorities to prepare and publish an OSS were
introduced in the Planning (Scotland) Act 2019. It inserted Section 3G Open
Space Strategy into the Town and Country Planning (Scotland) Act 1997.
Section 3G (2) of the Act states “an open space strategy is to set out a
strategic framework of the planning authority’s policies and proposals as to
the development, maintenance and use of green infrastructure in their district,
including open spaces and green networks.”  Section 3G (3) of the Act sets
out an open space strategy must contain: 
(a) an audit of existing open space provision
(b) an assessment of current and future requirements
(c) any other matter which the planning authority considers appropriate.

Page 3

3.4 NPF4 identifies blue-green infrastructure, open space, play, recreation and
sport as essential components of sustainable places. Policies 20 (Blue and
Green Infrastructure) and 21 (Play, Recreation and Sport) require LDPs to
protect, enhance and expand these assets, informed by an evidence-based
OSS. Together, these policies establish the OSS as a key tool for delivering
NPF4 objectives. 
3.5 The preparation of this OSS provides an effective, corporate means to co-
ordinate the policies of the different council services with responsibilities for
development, maintenance and use of green infrastructure. It is a key
evidence base to support the preparation of LDP3 and wider corporate
priorities, including tackling climate change, supporting physical and mental
wellbeing, and enabling our children and young people to achieve their full
potential. 
The Draft Strategy’s Vision and Strategic Outcomes 
3.6 The OSS will form an evidence base for planning decisions by providing
standards, guidance and policy to help ensure that open spaces continue to
meet the needs of communities now and in the future. 
3.7 The vision proposed in the draft OSS is: 
Figure 1: Blue and green network components

Page 4

3.8 “Every community in Perth and Kinross enjoys safe, inclusive and biodiverse
open spaces within easy reach, connected by nature-rich blue-green networks
that support climate resilience, healthier lives and equal opportunities for all
ages.” 
3.9 To deliver this vision, the draft OSS identifies the following six strategic
priorities that are consistent with the national expectations for Open Space
Strategies. 
• Access to quality open space – Open spaces will be planned, designed
and managed to ensure all residents can access good-quality spaces
within their local area.
• Successful, sustainable places – Open spaces will contribute to the
creation of well-designed and sustainable places, supporting placemaking
and local living.
• Health and wellbeing – Open spaces will support physical and mental
health by providing accessible, welcoming and safe environments for
recreation, social interaction and connection to nature.  
• Advancing equality and inclusion – Open spaces will be accessible and
inclusive for all users, helping to reduce inequalities and support diverse
community needs. 
• Nature positive places – Open spaces will protect, enhance and connect
habitats, supporting biodiversity and delivering positive outcomes for
nature. 
• Climate change mitigation and adaptation – Open spaces will function
as nature-based solutions to climate change by reducing emissions and
increasing resilience to climate change impacts. 
Open Space Standards 
3.10 The OSS adopts the Council’s existing standards for the quantity of and
accessibility to open space provision, as set out in the Standards section of
the strategy (page 6). As this was the Council’s first open space audit, a
quality standard was introduced to provide a clear benchmark, with the
expectation that sites assessed would achieve a rating of ‘Good’ or higher. 
The Open Space Audit 
3.11 In accordance with statutory requirements, an audit of existing open space
provision across Perth and Kinross was undertaken to inform the preparation
of the draft OSS. The purpose of the audit is to undertake an assessment of
the quantity, quality and accessibility (i.e. spatial distribution) of existing open
spaces. The Open Space Audit Report (Appendix 2) has been prepared and
provides detailed information on the audit undertaken. The section below
provides key information from the report. 
3.12 The audit considered all open spaces within or adjacent to settlement
boundaries identified in the current Local Development Plan (LDP2) that were
0.2ha or larger, as well as smaller sites considered to be of local importance
(e.g. pocket parks, memorial gardens). This audit considers all open spaces
whether publicly or privately managed sites. For a breakdown of the Council’s

Page 5

greenspace assets please refer to the Community Greenspace Asset
Management Plan (CGAMP). 
Quantity Assessment 
3.13 Each site was visited and initially pre-screened to identify a subset of open
spaces deemed accessible to the public. A summary of the spaces
considered in the audit is provided in the table below. The public open spaces
(POS) where then taken forward to the quantity benchmarking and quality
assessment stage of the audit.   
Table 1: Overview of all open spaces considered in audit
Type No. Sites Total Area
(Ha)
Public open space (POS) 432 906
Open space with limited accessibility or no
public function (e.g. golf courses, allotments,
natural space with no formal access). 480 1,996
Total 912 2,902 
3.14 Although the quantity benchmarking focused on populations residing in
settlements with a boundary identified in LDP2, it is helpful to contextualise
the findings at a wider authority scale. If the total Perth and Kinross population
of 150,953 (Census, 2022) were applied to the quantity standard, the resulting
POS requirement would be approximately 528ha. The audit identified around
906ha of POS, indicating that, at an overall level, open space quantity
comfortably exceeds the benchmark but requires an accessibility analysis as
to whether its distribution is suitable. 
Accessibility Analysis 
3.15 An accessibility analysis was undertaken to assess the distribution of public
open spaces in relation to the population based on the Council’s accessibility
standards. The findings help to identify areas of sufficient provision as well as
locations where accessibility gaps may exist. The table below presents the
outputs of the accessibility analysis across all LDP2 designated settlements. 
Table 2: Percentage households meeting accessibility standards across
LDP2 settlements 
Public Park
(700m)
Playing Field
(1200m)
Local
Equipped
Area for Play
(LEAP)
(400m)
Neighbourhood
Equipped Area
for Play (NEAP)
(1000m)
All Settlements 84% 95% 60% 84%

Page 6

Quality Assessment 
3.16 A quality assessment was undertaken to evaluate the condition and
characteristics of open spaces identified as publicly accessible in the audit.
The findings identify those spaces that are performing well and provide good
value to communities, as well as those where improvements may be required.
A full description of the quality criteria used in the assessment is provided in
Appendix 2: Open Space Audit Report. 
3.17 Overall, only 2% of the sites assessed failed to meet the overall quality
standard. The table below sets out the number of sites scoring above ‘good’: 
Table 3:Public open space quality assessment summary results
Quality Criterion % sites scoring ‘Good’ or
above
Accessibility 78%
Place Quality 84%
Care and Maintenance 94%
Biodiversity 91%
Community Use 87%
Overall Quality Score 98% 
Overview of Audit Outputs 
3.18 Appendix 3 provides a comprehensive summary of the settlement-level audit
findings and includes a breakdown for neighbourhoods in Perth. This is
supported by a series of spatial datasets developed during the assessment
process available on the Open Space Audit Map. Together, these outputs for
a spatial evidence base to inform planning decisions, including requirements
for on-site and/or off-site contributions. For ease of interpretation, the
following tables summarise the results for LDP2 settlements with populations
exceeding 1,000 residents. The table is colour coded to visualise settlement
performance in the audit with those scoring in the 10th decile shown green, 9th
yellow, 8th orange and those in the 7th or below (<70%) shown red.

Page 7

Table 4: Open space audit quantity and accessibility summary: LDP2
settlements
Settlement
Population
(Census
2022)
Meets
Quantity
Standard
Quantity
Shortfall
(Ha)
% Households meeting accessibility
standard
Public
Park
(700m)
Playing
Field
(1200m)
LEAP
(400m)
NEAP
(1000m)
Perth 49,292 Yes  89% 99% 62% 88%
Blairgowrie 9,433 No -3.5 75% 98% 58% 70%
Kinross and
Milnathort 7,606 Yes  82% 100% 69% 91%
Crieff 7,142 Yes  95% 99% 52% 89%
Auchterarder 6,061 Yes  59% 91% 62% 74%
Scone 5,232 Yes  87% 100% 43% 84%
Bridge of Earn 2,918 No -2.1 100% 100% 63% 76%
Pitlochry 2,694 Yes  87% 97% 59% 85%
Alyth 2,345 Yes  96% 99% 67% 95%
Coupar Angus 2,132 Yes  90% 99% 80% 65%
Invergowrie 1,969 Yes  88% 96% 55% 88%
Aberfeldy 1,886 Yes  94% 100% 84% 91%
Comrie 1,847 Yes  79% 98% 42% 87%
Inchture 1,565 Yes  100% 100% 55% 100%
Luncarty 1,514 Yes  94% 99% 41% 98%
Errol 1,500 Yes  100% 100% 70% 100%
Stanley 1,497 No -4 83% 95% 71% 96%
Abernethy 1,425 No -1.3 86% 96% 49% 92%
Methven 1,301 Yes  91% 100% 48% 100%
Bankfoot 1,254 Yes  88% 98% 73% 98%
Dunkeld and Birnam 1,194 Yes  97% 94% 72% 96%
St Madoes and
Glencarse 1,096 Yes  92% 100% 90% 97%
Longforgan 1,079 No -1.9 57% 100% 24% 80% 
3.19 It is important to recognise that a range of factors contribute to identified
shortfalls in POS provision in certain settlements: 
• Historic development of the settlement that did not prioritise open space
provision. This is particularly evident in Perth.
• The presence of spaces that could not be classified as POS in the audit
due to accessibility constraints or lack of clear public function.
• Standard open space typologies do not account for the recreational value
of accessible countryside, which may lessen demand for formal provision
in smaller rural communities.
• The phased delivery of larger public open spaces in new developments
can result in temporary shortfalls following housing occupation. 
Engagement to Date 
3.20 The open space audit provides a quantitative assessment of provision across
Perth and Kinross. However, it is important to consider the audit findings
alongside the lived experience of communities as well as the operational
knowledge of Council services. Internal and external engagement activities

Page 8

were undertaken in parallel with the audit to provide additional context,
identify local priorities, and help validate the findings. 
3.21 An internal Open Space Strategy Working Group has been established,
comprising of officers from Planning and Community Greenspace teams. This
group has provided ongoing input and oversight, helping to shape the
direction of the Strategy and ensuring alignment with wider policy, service
priorities and operational considerations. 
3.22 Wider community views have been captured through a programme of Place
Standard engagement in 2023 undertaken as part of LDP3’s Evidence Report
process. The ‘Big Place Conversation’ gathered feedback from communities
across the area on the quality of their local places, including the availability,
accessibility and quality of open space. The findings have provided a valuable
evidence base in identifying key issues, priorities and spatial inequalities. 
3.23 Focused engagement was undertaken though an Open Space Survey (2025),
which invited feedback from residents on their use and experiences of local
open spaces. This received 212 responses and helped to identify patterns of
use, levels of satisfaction and areas for improvement. The survey found
residents are frequent users of open spaces, with 85% visiting at least several
times per week. Parks, public gardens and natural greenspaces are the most
valued and frequently used assets. Despite high usage, only 44% of
respondents are satisfied with local provision while 32% are dissatisfied,
indicating scope for improvement. A summary report is provided in Appendix
4. 
Figure 2: Overall satisfaction with local open space provision (no. respondents) 
3.24 In addition, a Playing Out in Perth and Kinross Survey (2023) gathered the
views of children and young people, providing important insight into play
provision which has informed the assessment of play sufficiency across the
area. A summary of the feedback received is available in the Draft Play
Sufficiency Assessment. 
3.25 Together, these engagement activities have informed the development of the
Strategy’s priorities and outcomes, ensuring they reflect the needs,
preferences and experiences of both communities and stakeholders.
Engagement outputs, along with priorities identified in Community Action
Plans and Local Place Plans, will be used alongside the open space audit
findings to provide an evidence base for site requirements and settlement
strategies in the forthcoming LDP3.

Page 9

Next stage of consultation 
3.26 Subject to Committee approval, the OSS will be issued for public consultation.
The consultation will provide residents, community organisations, developers,
key agencies and other stakeholders with an opportunity to comment on the
proposed strategy and policies. There will be opportunity to comment on the
sites included in the open space audit to ensure all public open space has
been included. Feedback received during the consultation will be reviewed
and used to inform any necessary amendments to the OSS. A finalised
version of the strategy, together with a summary of consultation responses
and proposed changes, will then be presented to Committee for consideration
and adoption. 
4. Conclusions 
4.1 The draft OSS responds to both existing provision and the changing needs of
communities. This includes recommendations on how to address deficiencies
in existing provision while ensuring future provision is sustainably planned,
delivered and managed. 
4.2 The draft OSS establishes the evidence base, strategic framework and
priorities that will inform the preparation of LDP3. Current and future
requirements will be addressed, where feasible, through LDP3’s policies,
settlement strategies and site-specific developer requirements. It is important
to note that addressing shortfalls in provision is unlikely to be achieved solely
through contributions from new development, as these must be proportionate
to the scale of development. However, opportunities will be identified through
LDP3, and, where opportunity permits, the Council will seek to secure
external funding to address gaps. 
Current Requirements and Deficiencies 
4.3 The evidence base gathered through the open space audit and engagement
activities highlights a number of requirements for the existing open space
network. Key requirements addressed are to: 
• Designate and safeguard existing open space provision, including 70
hectares of undesignated POS identified through the audit.
• Enhance the quality, accessibility and functionality of POS to support a
wider range of recreational, sporting, play, social and environmental
functions for all user groups.
• Expand active travel opportunities across green networks, ensuring
communities have access to green corridors that facilitate walking,
wheeling and cycling through settlements and into the wider countryside.
• Strengthen management and maintenance arrangements, particularly in
the context of resource constraints and ageing infrastructure.
• Support collaborative management approaches with communities and
secure funding to deliver local priority actions and projects. 
4.4 Addressing identified deficiencies remains a key priority and where they have
been identified the following approaches will be pursued:

Page 10

• Safeguard existing POS provision.
• Secure appropriate on-site and off-site developer contributions.
• Pursue external funding opportunities using the OSS as an evidence-base.
• Apply the Infrastructure First principle to ensure POS in new developments
are delivered at the earliest practical stage, taking account of other
infrastructure requirements and any masterplanning of the site.
• Review sites identified in the audit that were not classified as POS, and,
where appropriate, improve accessibility and functionality to make them
public spaces.
• Prioritise quality enhancements to existing open spaces, and path
networks, in areas where new provision is not feasible.
• Regarding the provision of new play spaces or sport facilities, deficiencies
identified in the audit will be addressed following the approaches set out in
the Playground Strategy and Policy on Provision of Facilities for Outdoor
Pitch Sports. 
Future Requirements 
4.5 Looking ahead, the Strategy also plan for future growth, climate challenges
and evolving community needs. Key requirements addressed are to: 
• Integrate good-quality, multifunctional blue-green networks into new
development, ensuring open space standards are met.
• Support local living by ensuring active travel opportunities are integrated
with blue-green networks.
• Deliver nature-positive outcomes through habitat creation, biodiversity
enhancement and connections to nature networks.
• Improve climate resilience through measures such as urban greening,
sustainable drainage (SuDS), shading and flood management measures.
• Ensure the long-term sustainability of open spaces through effective
maintenance arrangements, partnership working and community
involvement. 
5. Impact and Value Assessment 
Draft Open Space Strategy Impact and Value Assessment Form 
6. Appendices 
5.1 Appendix 1 - Draft Open Space Strategy 
5.2 Appendix 2 - Open Space Audit Report 
5.3 Appendix 3 - Open Space Audit Results 
5.4 Appendix 4 - Open Space Survey Summary Report

Page 11

No embedded text on this page.