Appendix 10 - Site Plan - Kinross West Business Centre
Perth and Kinross Council · 22 April 2026
Back to Economy and Infrastructure Committee — 22 April 2026 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
3 919 5 311375E 702025N 311400E 113.000 113.000 113.000 113.000 113.000 114.000 114.000 114.000 114.000 113.500 113.500 113.500 114.500 114.500 113.000 113.000 113.000 114.000 114.000 114.000 114.000 113.500 113.500 113.500 114.500 114.149 STN1 114.441 114.285 114.143 114.174 114.185 114.137 114.042 113.982 113.927 113.878 BT 114.169 Road - Tar Surface Road - Tar Surface 114.509 114.415 114.322 114.256 114.216 114.145 114.080 114.027 113.987 113.993 113.975 BH BH Cover Cover 114.102 113.580 ELEC SUB STN CONC Gas Valve Gate Metal panel fence 1.8-2.4m Metal panel fence 1.8-2.4m Metal panel fence 1.8-2.4m Metal panel fence 1.8-2.4m Metal panel fence 1.8-2.4m Metal panel fence 1.8-2.4m Metal panel fence 1.8-2.4m 113.370 113.267 113.169 113.140 113.089 113.017 113.179 112.991 113.183 113.244 Metal panel fence 1.8-2.4m113.341 113.336 113.352 LP LP Eaves 118.746 Ridge 120.173 Building 114.091 113.535 113.758 113.699 113.554 113.228 113.211 113.247 113.281 113.303 113.389 Metal panel fence 1.8-2.4m Metal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4mMetal panel fence 1.8-2.4m Metal panel fence 1.8-2.4m 112.826 112.926113.049113.299113.410113.641113.690113.894113.794113.924 112.921 114.088 114.074 114.009 113.214 113.211 113.166 113.133 113.150 113.194 113.160 113.228 113.295 113.381 113.448 113.498 113.597113.639113.643 113.751 114.114 114.228 114.215 114.180 114.223 114.292 114.334 114.418 Timber fence 1.2-1.5m Timber fence 1.2-1.5m Timber fence 1.2-1.5m Timber fence 1.2-1.5mTimber fence 1.2-1.5m Timber fence 1.2-1.5mTimber fence 1.2-1.5mTimber fence 1.2-1.5mTimber fence 1.2-1.5mTimber fence 1.2-1.5mTimber fence 1.2-1.5m 113.201 113.164 113.083 113.093 113.067 113.062 113.125 113.170113.138 113.200 113.245 113.326 113.427 113.664 113.774113.755 113.227 113.199 113.219 113.235 113.235 113.242 113.258 113.257 113.286 113.357 113.416 113.503113.587 113.665 113.705113.746 LP LP LP LP 113.663 113.661 113.754 114.092 Tactile paving Tactile paving HYSV Road - Tar Surface Road - Tar Surface Road - Tar Surface Road - Tar Surface Road - Tar Surface Road - Tar Surface Road - Tar Surface 113.815 113.827 113.845 113.897 113.971 114.065 114.073 114.125 114.218 114.324 114.369 114.273 114.184 114.156 114.096 114.062 114.044 114.002 113.944114.028114.095 114.140 114.209 114.238 114.320 114.450 GG Drop Kerb Drop Kerb Tactile paving GAS GOVERNOR 113.991 113.992 114.040 114.062 114.131 114.194 114.246 114.317 114.357 114.490 114.555 Drop Kerb Tactile paving BT 113.971 BoB BoB BoB 112.977 112.969 112.955 113.079 BoB BoB BoB 112.921 112.922 113.094 114.140 114.232 114.147 114.093 114.049 113.879 113.797 113.702 113.532 113.462 113.283 113.265 113.237 113.214 113.187 113.071 113.051113.053 113.141 113.205 113.118 113.170 113.165 113.129 113.261 113.413 113.573 113.393 113.372 113.311 113.291 113.279 113.433 113.553 113.662113.775 113.891 114.065 114.084 114.152 114.266 114.232 MH 114.101 MH 113.342 Concrete Concrete 113.460 113.474 113.470 113.475 MH 113.484 BT 113.409 ConcreteConcrete 113.511 113.522 113.535 113.529 MH 113.546 Control Panel EARTH ROD 113.366 113.370 113.365 MH 113.696 Rough track Rough track Rough track Rough track Sewage pumping station Trees/bushes Tar footpath Tar footpath Tar footpath Tar footpath Tar footpath Tar footpath Tar footpath Tar footpath Tar footpath ToB ToB ToB ToB ToB ToB ToB ToB ToB ToB 113.965 113.997 114.036 114.156 114.229 114.343 114.370 114.326 114.258 114.179 114.128 A B 1 3 5 7642 A B 1 3 5 7642 6000 6000 3505 3669 6000 1200 6000 3500 45° BUILDING WARRANT McLAREN MURDOCH & HAMILTON C H A R T E R E D A R C H I T E C T S Small Business Units for Perth and Kinross Council 1/200 @ A1 Proposed Site Plan Aug 25 3150_BW_100 A KR CJB MacDuff Road, Kinross Proposed Site Plan 1/200 @ A1 scale - 1/200 @ A1 0m 10m 20m 30m site boundary - N drainage wayleave to be maintained Unit 1 Air source heat pumps to be located at the rear of each unit bin storage bike storage unit Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 EV charger units 2m high security fence 2m high security fence 2m high security vehicle & personnel gate 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Air source heat pumps to be located at the rear of each unit Air source heat pumps to be located at the rear of each unit permeable monoblock paving to engineers specification existing water hydrant Rev A : 26.11.25 : revised for BW response