Appendix 6 - Site Plan - Site 1, Kinross West
Perth and Kinross Council · 22 April 2026
Back to Economy and Infrastructure Committee — 22 April 2026 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
30 El Sta Sub 29 34 Ordnance Survey, (c) Crown Copyright 2023. All rights reserved. Licence number 100022432 MacDuff Place Junction Road M90 (South Bound) M90 (North Bound) Levenbridge Place Montgomery Way 30 Sub 29 34 A 1 2 3 4 5 B C D MacDuff Place Junction Road M90 (South Bound) M90 (North Bound) Levenbridge Place A 1 2 3 4 5 B C D Accessible Toilet Þ Þ Þ Ý Staff Mess Office Staff Toilet Lobby Ý Campbell of Doune Ltd Consulting Civil and Structural Engineers Clan House, Muthill Road, Crieff, PH7 4HQ Registered Office: Macfarlane Gray Accountants, Macfarlane Gray House, FOR AT REVISION: Registered in Scotland No. 277704 Tel: 01764 655459 DATE: A family business since 1860 q BS5502 Class II Agricultural q BS5950 Industrial BUILDING DESIGN CLASSIFICATION q Domestic q Other DESIGN CHECK LEVEL q DCL1 - Self Check q DCL2 - Simple Check q DCL3 - Intermediate Check q DCL4 - Extended Check e-mail: info@campbellofdoune.co.uk Castlecraig Business Park, Springburn Road, Stirling, FK7 7WT www.campbellofdoune.co.uk DRAWN SCALE DRAWING No.DATE PAPER SIZE CONTACT WEB Job No. Drawing Status 8782-23 PLANNING Proposed New Industrial Building Site 1, MacDuff Place, Kinross West, Kinross AJ Spence Site & Location Plans, Elevations & Floor Plan JR As Noted 09.05.23 001 A1 X A - Planning Queries 25.05.23 B - Planning Clarification 25.05.23 Scale: NTS OS SITE LOCATION PLAN1 Scale: 1:1250 SITE LOCATION PLAN2 Scale: 1:500 SITE PLAN 3 Scale: 1:100 FLOOR PLAN4 Ridge Line Rooflight Rooflight Roller Shutter DoorRoller Shutter DoorRoller Shutter Door Escape Door Escape Door Proprietary Inspection Pit Heated Office and Staff amenities area with ceiling over + allowance for storage above Principle Access Door 1800 2266 5621 3473 1200 3559 2381 1200 2000 2493 6236 9087 6096 6096 6096 6096 24384 6096 6096 6096 18288 5000 5000 5000 Scale: 1:100 EAST ELEVATION5 Scale: 1:100 NORTH ELEVATION6 Scale: 1:100 WEST ELEVATION7 Scale: 1:100 SOUTH ELEVATION8 6096 6096 6096 6096 24384 5000 5000 5000 5000 5000 5000 6000 2549 8549 15.0° 6096 6096 6096 18288 6000 2549 8549 6096 6096 6096 6096 24384 6000 2549 8549 6000 2549 8549 15.0° 6096 6096 6096 18288 Proposed New Workshop building with Heated Stand Alone Office and Staff Amenities Area 476m² Total Floor Area Existing Access (to Remain as is) 7 No. (4 Staff + 3 Visitors) Parking Spaces Site Boundary 3627m² Total Site Area Existing screen planting to remain Additional screen planting (to match existing) to be planted here Site Boundary 3627m² Total Site Area Site Location Site 1 MacDuff Place Kinross West Kinross DESIGN Building is designed to BS 5950 (Industrial Spec) BUILDING USE Workshop Building with Associated Offices and Staff Amenities OWNERSHIP / OCCUPANCY The is under the applicants ownership and occupier. MAIN STRUCTURAL STEELWORK To be a single storey, single span steel portal framed building. STRUCTURAL STEELWORK All fabricated structural steelwork delivered to the site shall incorporate appropriate "UKCA" marking in order to conform to the requirements of BS EN 1090-1 All Structural steelwork forming main frames and bracing members to be hot dip galvanised to EN ISO 1461. RADON GAS The proposed development is not within an area which would be deemed a Radon Gas Affected Area, as such no Radon protective measures are required. COAL MINING The proposed new building is NOT within an area where coal mining has been carried out in the past or is proposed in the future and is out with the coal mining reporting area as per the Coal authorities interactive viewer. HEATING or COOLING Building is to contain a stand alone heated area (<50m²), housing the office and staff amenities area, which is to be heated by way of electric heaters. FOUNDATIONS Site to be excavated to formation level & all vegetable matter to be removed from site. All to be built off natural firm ground conditions to satisfaction of engineer. Ground to have a bearing capacity of 80kN All foundations to have a minimum ground cover of 450mm. FLOORS 150mm concrete floor cast in situ. RC25/30 concrete mix with A252 mesh reinforcement cast over 1000 gauge polythene Damp Proof Membrane, insulation is to be placed below the heated areas floor, all to set on 20mm sand blinding over consolidated hardcore laid in layers no greater than 150mm. Floors to be laid to falls where required. EXTERNAL WALLS (CLADDING) All side and gable walls to have composite panel cladding (down to levels show). All cladding to be complete with flashing's & trims to be fixed to Galvanised Sheeting Rails (sleeved) bolted to frames. Sheeting rails to have anti sag system and rail / column stays (at positions indicated) installed. Cladding and rails to be fitted and fixed in accordance with manufacturers written instructions. Heritage Green (RAL 6002) in Colour BLOCKWORK (PERIMETER & BELOW INTERNAL DIVISION) All to be 140mm thick dense concrete blockwork building of off strip foundation to perimeter and internal wall wall between main space and offices and amenities area. Perimeter blockwork to finish at 1 course above FFL. Blockwork wall located between the Offices and main area to be 2.8m high (from FFL) ROOF To be composite panel roof cladding. All to be complete with flashing's, trims and all to be fixed to galvanised purlins bolted to frames with purlin stays fitted. Cladding to be fitted and fixed in accordance with manufacturers written instructions. Heritage Green (RAL 6002) in Colour ROOFLIGHTS Rooflight panels to be positioned as shown on the floor plan. INTERNAL WALLS (PERIMETER & BELOW INTERNAL DIVISION) All to be C16 timber studs @ 600mm ctrs. 95mm studs where walls are located on the external perimeter of the building, and 140mm C16 timber studs where walls are forming envelope between heated and unheated areas of the building. complete with 25mm dpc faced spacer to blockwork and 25mm service void batten to inside face. All walls to have insulation fitted between studs. Internal partition walls to be 95mm C16 timber studs complete with deafening insulation installed. All walls are to have plasterboard finish, taped and filled. CEILING Ceiling over Office and amenities area to be formed in JJI's @ 600mm ctrs with plasterboard finish to under side and 22m chipboard finish to top side, with Loft roll 44 to be positioned between the joists SURFACE WATER DRAINAGE To be pre-formed trim line gutters all to be complete with 110mm Ø pvc downpipes connecting to sub-surface drainage system. All Gutters & downpipes to be fitted and fixed in accordance with manufacturers written instructions. Surface water drainage to connect to the existing site drainage system directing surface water to the SuDS which services the Kinross West development plots. All to be in accordance with General Binding Rules (GBR's 10, 11 & 21) of schedule 3 of The Water Environment (Controlled Activities) (Scotland) Regulations 2005 (CAR). FOUL WATER DRAINAGE To be discharge to the existing disconnection chamber located on the site, and to the foul sewer serving the site / plots. ACCESS / ESCAPE To be byway of personnel door (as shown on the floor plan). All escapes to have a Minimum clear opening width of 800mm. DOORS Main vehicle access door to areas to be galvanised roller shutter door (as shown on the floor plans) GENERAL All works to be in accordance with the Building (Scotland) Regulations 2004 and all current amendments. Any structural and external timbers to be pressure impregnated against insect, rot and fungal attack all finishes to be to satisfaction of client All works to be in accordance with the appropriate statutory bodies requirements and or approvals for the works and use, for example; Perth & Kinross Council Planning & Building Standards, SEPA, Scottish Water & The Scottish Fire & Rescue Service and any other bodies relevant to the proposals. All proprietary materials to be fitted fixed and installed in accordance with manufacturers current written instructions and or certification documents i.e. BBA certificates. Any changes from the approved drawings and specification requested by client or contractor are to be fully approved by Planning and Building Standards departments prior to implementation. Campbell of Doune Ltd cannot accept responsibility for any changes from the approved documents. 3000 12500 Concrete Plat & Ramp down to FGL Concrete Plat & Ramp down to FGL Concrete Plat & Ramp down to FGL Proprietary Inspection Pit Bin Storage & recycling area Accessible Parking Space 13720 1100 2m high galvanised palisade security fence to perimeter 2m high V Mesh security gates Existing timber fences forming house to plot boundaries to remain as is FFL = 114.350 (150mm above the existing slab (to be removed) level) Existing slab and sub base works to be fully grubbed up and removed. Where possible, existing materials which can be reused on site should be set aside for re use in the new proposals or for recycling elsewhere. Existing slab and base works Hardcore yard area Grassed area 0 2000 100004000 6000 8000 1:100 0 10000 5000020000 30000 40000 1:500 0 25000 12500050000 75000 100000 1:1250 1500 1500 Ø24000 Turning Circle Grassed area Concrete Plat & Ramp down to FGL N W E S N W E S N W E S 2.0m high galvanised palisade security fence 2.0m high Green V mesh security fence 2.0m high Green V mesh security fence 2.0m high Green V mesh security fence