Democracy Spraffa

Appendix 4 - Site Plan - Northfield Business Centre (Phase I)

Perth and Kinross Council · 22 April 2026
Back to Economy and Infrastructure Committee — 22 April 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

LP
LP
LP
LP
LP
LP
RS
1
3
5
7
9
A
B
2
4
6
8
1
3
5
7
9
A
B
2
4
6
8
6000
6000
10531
12618
8650
N
BUILDING WARRANT
McLAREN MURDOCH & HAMILTON
C   H   A   R   T   E   R   E   D     A   R   C   H   I   T   E   C   T   S
Small Business Units
For Perth and Kinross Council
1/200 @ A1
Proposed Site Plan
Aug 25
3149_BW_100 B
KR
CJB
Arran Road, Inveralmond, Perth
Proposed Site Plan
1/200 @ A1
scale - 1/200  @ A1
0m 10m 20m 30m
site boundary -
drainage wayleave to be maintained
Phase 2
Units are to be covered under a
separate Application
Unit 1
Unit 2
Unit 3
Unit 4
Unit 5
Unit 6
Unit 7
Unit 8
Air source heat pumps to be
located at the rear of each unit
bin storage for
units 1-4
bin storage for
units 5-8
Air source heat pumps
to be located at the
rear of each unit
EV charger unit
2m high security vehicle
& personnel door
2m high security fence
2m
high security fence
2m high security fence
2m
high security fence
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Permeable Paving
New permeable paving.
Tarmac Road
New tarmac road to structural engineers details and specification.
BS
Bike Shelter
Broxap Blox C - Cycle Shelter.  Width 3000mm x Length 5000mm. Capacity for 12no cycles. Shelter to be installed on
brushed concrete base.
BS
BS
Rev A : 12.11.25 : revised for BW response
Rev B : 26.11.25 : revised for BW response