Appendix 4 - Site Plan - Northfield Business Centre (Phase I)
Perth and Kinross Council · 22 April 2026
Back to Economy and Infrastructure Committee — 22 April 2026 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
LP LP LP LP LP LP RS 1 3 5 7 9 A B 2 4 6 8 1 3 5 7 9 A B 2 4 6 8 6000 6000 10531 12618 8650 N BUILDING WARRANT McLAREN MURDOCH & HAMILTON C H A R T E R E D A R C H I T E C T S Small Business Units For Perth and Kinross Council 1/200 @ A1 Proposed Site Plan Aug 25 3149_BW_100 B KR CJB Arran Road, Inveralmond, Perth Proposed Site Plan 1/200 @ A1 scale - 1/200 @ A1 0m 10m 20m 30m site boundary - drainage wayleave to be maintained Phase 2 Units are to be covered under a separate Application Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Unit 7 Unit 8 Air source heat pumps to be located at the rear of each unit bin storage for units 1-4 bin storage for units 5-8 Air source heat pumps to be located at the rear of each unit EV charger unit 2m high security vehicle & personnel door 2m high security fence 2m high security fence 2m high security fence 2m high security fence 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Permeable Paving New permeable paving. Tarmac Road New tarmac road to structural engineers details and specification. BS Bike Shelter Broxap Blox C - Cycle Shelter. Width 3000mm x Length 5000mm. Capacity for 12no cycles. Shelter to be installed on brushed concrete base. BS BS Rev A : 12.11.25 : revised for BW response Rev B : 26.11.25 : revised for BW response