Appendix 3
Pre-screening
Notification
Responsible Authority: Perth and Kinross Council
Title of the plan: Birnam Conservation Area Appraisal and Management Plan

Page 2

What prompted the
plan:
(e.g. a legislative,
regulatory or
administrative provision)
The Council has a duty to formulate and publish, from time to time, proposals
for the preservation and enhancement of any parts of their district which are
Conservation Areas.
This is a provision of Section 63 of the Planning (Listed Buildings and
Conservation Areas) (Scotland) Act 1997
Plan subject:
(e.g. transport)
Town and Country Planning
Brief summary of the
plan:
(including the area or
location to which the
plan related)
An appraisal of the area likely to be included within the boundaries of the
Birnam Conservation Area. The Appraisal and Management Plan seeks to define
the key elements of the area that contribute to its character and appearance. A
map of the area showing the Conservation Area boundary is included at the end
of this report.
Brief summary of the
likely environmental
consequences:
(including whether it has
been determined that
the plan is likely to have
no or minimum effects,
either directly or
indirectly)
An SEA is not required because the Appraisal and Management Plan is unlikely
to have significant environmental effects.
The Appraisal and Management Plan document is primarily one of analysis with
a small element identifying future possibilities for management or
enhancement.
Most of the impacts of any proposals that may be set out in the document will
be covered by other PPSs or will require further guidance, which will itself be
considered under the SEA legislation.
Brief summary of how
environmental
principles have been
considered:
(including whether any
of  the guiding
principles, as set out in
section 13 of the
Continuity Act, are
relevant to the plan)
The Birnam Conservation Area Appraisal and Management Plan will set out and
define the special characteristics of the built heritage in the settlement and will
serve as a management tool, identifying opportunities for further action by the
local planning authority and others in preparing enhancement schemes.
However, the settlement of Birnam is developed in the main, and little
development should be expected as a result of the Conservation Area Appraisal
and Management Plan, and Article 4 Direction. In fact, these are more likely to
reduce opportunities for minor development incompatible with the historic
townscape to occur.
The Conservation Area Appraisal and Management Plan does discuss possible
enhancement schemes; however these are very much suggestions and do not
constitute a programme of work. When preparing the Conservation Area
Appraisal and Management Plan, the Council is required to identify areas where
the historic environment and character of the area could be enhanced. But
these are merely suggestions that would require further assessment, including:
 securing necessary funding;
 enhanced public consultation; and
 reaching partnership agreements with local organisations that are likely
to take forward some of the enhancement projects.
Therefore Perth and Kinross Council does not believe that significant
environmental effects will occur as a result of this Appraisal. It is expected that
the area should continue to exist largely as it is now with only minor

Page 3

When completed send to: SEA.gateway@gov.scot or to SEA Gateway, Scottish Government, Area 2F
(South), Victoria Quay, Edinburgh, EH6 6QQ
development occurring. The Conservation Area Appraisal and Article 4 Direction
affect a small area and any impact will be localised in nature.
It is worth noting that Perth and Kinross Council undertook full SEA
Environmental Reports for the Pitlochry, and the Coupar Angus Conservation
Areas Appraisals. For these plans, Biodiversity, Cultural Heritage and Material
Assets were scoped in to the Environmental Reports. As a result of this work, it
is now accepted that Conservation Area Appraisals and Management Plans may
be characterised as guidance documents and as such do not have associated
actions or works that will be carried out as part of the preparation of the
Conservation Area Appraisal or Management Plan.
It was noted that in response to the SEA topics originally considered:
 For Biodiversity, SNH (now NatureScot) was concerned that the CAA
and Article 4 Direction would threaten European Protected Species (e.g.
bats, salmon, and otter) and may result in loss of important habitat and
greenspace. As the plans are very limited in scope and affect only small,
localised areas, the Council does not believe there will be significant
environmental effects. If the CAA would have been likely to result in
large scale development, the Council would not have reached this
conclusion. Minimal development is likely to occur in the Conservation
Area, and that will not have a significant effect on biodiversity.
 For Cultural Heritage and Material Assets, the CAA will help protect the
special character of the conservation area. However the plan is unlikely
to have significant effects on the historic environment because it is
limited to a small area and does not identify major or specific large-
scale programmes of work.
Contact details: Alasdair Finlayson
Developer Contributions Officer: Economy, Development & Planning
Perth & Kinross Council, 2 High Street, Perth, PH1 5PH
01738 475315
Date of opinion: 19 December 2025