Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD 
20 June 2023 
SUPPLEMENTARY PACK 1 
PLANNING, PROTECTIVE SERVICES AND LICENSING COMMITTEE - ON A HYBRID BASIS
IN THE MARRIAGE SUITE, HELENSBURGH AND LOMOND CIVIC CENTRE, 38 EAST CLYDE
STREET, HELENSBURGH AND BY MICROSOFT TEAMS on WEDNESDAY, 21 JUNE 2023 at
1:00 PM 
I enclose herewith supplementary reports for items 5, 6, 7, 8, 9 and 10 on the Agenda for the
above meeting. 
Douglas Hendry
Executive Director 
SUPPLEMENTARY REPORTS 
5. HOLIDAYS DIRECT MARKETING: CHANGE OF USE OF LAND FOR THE SITING
OF 10 HOLIDAY PODS, FORMATION OF VEHICULAR ACCESS AND PARKING,
INSTALLATION OF SEWAGE TREATMENT PLANT AND ASSOCIATED
LANDSCAPING: LAND BETWEEN ACHNAKEEP AND SCHOOLHOUSE
COTTAGE, PORTSONACHAN (REF: 22/00625/PP) (Pages 3 - 8)  
Report by Head of Development and Economic Growth 
6. MR COLIN CAMPBELL: ERECTION OF DECKING AND FENCING
(RETROSPECTIVE): 3 ACADEMY TERRACE, ACADEMY ROAD, ROTHESAY,
ISLE OF BUTE (REF: 22/01611/PP) (Pages 9 - 12)  
Report by Head of Development and Economic Growth 
7. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: TO CONSTRUCT AND
OPERATE A 275 KILOVOLT (KV) ELECTRICITY SUBSTATION AND
ASSOCIATED INFRASTRUCTURE.  THE WORKS WILL COMPRISE CUT AND
FILL TO TIE THE PLATFORM INTO THE EXISTING GROUND LEVEL
LANDSCAPING, SUSTAINABLE DRAINAGE SYSTEMS (SUDS) BASINS, NEW
PERMANENT ACCESS AND UPGRADES TO EXISTING TRACKS: LAND
APPROX 1.6 KM NORTH WEST OF MINARD AND UPSLOPE OF THE EXISTING
CRARAE SUBSTATION, MINARD (REF: 22/02376/PP) (Pages 13 - 24)  
Report by Head of Development and Economic Growth 
Public Document Pack

Page 2

8. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: ERECTION OF HIGH
VOLTAGE ELECTRICITY SUBSTATION AND FORMATION OF ASSOCIATED
ACCESS, LANDSCAPING, DRAINAGE AND MEANS OF ENCLOSURE (CRAIG
MURRAIL) SUBSTATION): ACHNABRECK FOREST - LAND APPROXIMATELY
2.5 KM NORTH EAST OF LOCHGILPHEAD AND 4 KM SOUTH WEST OF LOCH
GLASHAN, LOCHGILPHEAD (REF: 22/02578/PP) (Pages 25 - 36)  
Report by Head of Development and Economic Growth 
9. SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: ERECTION OF HIGH
VOLTAGE ELECTRICITY SUBSTATION AND FORMATION OF ASSOCIATED
ACCESS, LANDSCAPING, DRAINAGE AND MEANS OF ENCLOSURE
(CROSSAIG (NORTH) SUBSTATION): LAND ADJACENT TO CROSSAIG
SUBSTATION, SKIPNESS (REF: 23/00382/PP) (Pages 37 - 48)  
Report by Head of Development and Economic Growth 
10. MR D HIGGINS: ERECTION OF DWELLINGHOUSE, FORMATION OF
VEHICULAR ACCESS AND ASSOCIATED WORKS: GARDEN GROUND OF
TORWOOD HOUSE, TORWOODHILL ROAD, RHU, HELENSBURGH (REF:
22/02523/PP) (Pages 49 - 56)  
Report by Head of Development and Economic Growth 
Planning, Protective Services and Licensing Committee 
Councillor John Armour Councillor Gordon Blair
Councillor Jan Brown Councillor Audrey Forrest
Councillor Kieron Green (Chair) Councillor Amanda Hampsey (Vice-Chair)
Councillor Daniel Hampsey Councillor Graham Hardie
Councillor Fiona Howard Councillor Mark Irvine
Councillor Andrew Kain Councillor Paul Donald Kennedy
Councillor Liz McCabe Councillor Luna Martin
Councillor Peter Wallace   
Contact: Fiona McCallum                  Tel. No. 01546 604392

Page 3

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 22/00625/PP   
Planning Hierarchy: Local 
Applicant: Holidays Direct Marketing   
Proposal: Change of Use of land for the Siting of 10 Holiday Pods, Formation of Vehicular
Access and Parking, Installation of Sewage Treatment Plant and associated Landscaping 
Site Address: Land between Achnakeep and Schoolhouse Cottage Portsonachan 
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to advise Members that the Examination by Scottish Government
Reporters into the Argyll and Bute Proposed Local Development Plan 2 has now concluded
and the Examination Report has been published. The Examination Report is a material
consideration of significant weight. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non Notifiable
Modifications is a material consideration in the determination of all planning and related
applications. 
2.0 RELEVANT PLDP2 POLICIES
Policy 01 - Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking 
Policy 06 – Green Infrastructure 
Policy 08 – Sustainable Siting 
Policy 09 – Sustainable Design 
Policy 10 – Design – All Development 
Policy 14 – Bad Neighbour Development 
Policy 23 – Tourist Development, Accommodation, Infrastructure and Facilities
Policy 25 – Tourism Development Opportunities 
Policy 34 – Electric Vehicle Charging
Policy 35 – Design of New and Existing, Public Roads and Private Access
Page 3 Agenda Item 5

Page 4

Policy 36 – New Private Access
Policy 39 – Construction Standards for Private Access 
Policy 40 – Vehicle Parking Provision 
Policy 41 – Off Site Highway Improvements 
Policy 58 – Private Water Supplies and Water Conservation 
Policy 60 – Private Sewage Treatment Plans and Wastewater Drainage
Policy 61 – Sustainable Drainage Systems (SUDS) 
Policy 63 – Waste Related Development and Waste Management
Policy 71 – Development Impact on Local Landscape Area (LLA) 
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  
Policy 77 – Forestry, Woodland and Trees 
3.0 IMPLICATIONS OF PLDP 2 AS RECOMMENDED TO BE MODIFIED BY THE
EXAMINATION REPORT
The assessment of the proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows:
Policy 01 – Settlement Areas: The proposal is located within the Settlement Area for
Portsonachan as identified in PDLP2. The provisions of Policy 01 continues to set out general
support for development within the settlement area. No substantive change to previous
assessment. 
Policy 04 – Sustainable Development: Promotes the principles of sustainable development
and remain generally aligned with the requirements of ABC LDP STRAT 1 and NPF 4 Policies
1 and 2 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 05 – Design and Placemaking: Sets out principles for achieving good quality places and
is generally aligned with the requirements of ABC LDP 2015 Policy LDP 9 and SG LDP
Sustainable Design, and NPF4 Policy 14 which have already been applied to the assessment
of this matter. No substantive change to previous assessment.
Policy 06 – Green Infrastructure: Sets out a requirement for the developer to demonstrate how
green infrastructure has been integrated into the design of the proposal from the outset. This
policy overlaps with provisions elsewhere to consider enhancements to biodiversity and
sustainable urban drainage which have already been applied to the assessment of this matter.
No substantive change to previous assessment.
Policy 08 – Sustainable Siting: Sets out the principles for successfully integrating new
development into its landscape/townscape setting and is aligned with the provisions of NPF4
and ABC LDP 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been
applied to the assessment of this matter. No substantive change to previous assessment.
Policy 09 – Sustainable Design: Sets out that development proposals should demonstrate
consideration of and where possible utilisation of renewable sources of energy; and
sustainable design and construction methods. The Supporting Statement accompanying the
Page 4

Page 5

application identifies that the proposal has been specifically designed to be energy and
resource efficient. No substantive change to previous assessment.
Policy 10 – Design – All Development: Sets out requirements for the design of new
development and is generally aligned with the provisions of NPF4 and ABC 2015 Policy LDP
9 and SG LDP Sustainable Design which have already been applied to the assessment of this
matter. No substantive change to previous assessment.
Policy 14 – Bad Neighbour Development – Sets out that the Council will resist any proposal
that has an unacceptable adverse impact upon the amenity of neighbouring land uses unless
appropriately mitigated by planning condition or legal agreement. This is aligned with the
provisions of NPF 4 Policy 23 and ABC 2015 Policy SG LDP BAD 1 which have already been
applied to the assessment of this matter. No substantive change to previous assessment.
Policy 23 – Tourist Development, Accommodation, Infrastructure and Facilities – Establishes
a presumption in favour of new or improved tourist facilities and accommodation subject to
various criteria and is generally aligned with the provisions of NPF4 Policy 30 and ABC 2015
Policies LDP 5, SG LDP TOUR 1 and SG LDP TOUR 3 which have already been applied to
the assessment of this matter. No substantive change to previous assessment.
Policy 25 – Tourism Development Opportunities - Establishes areas with a significant potential
for the sustainable growth of the Argyll and Bute tourism industry. The proposed development
is located within one such area which is already established within ABC 2015. The proposed
development is therefore aligned with the provisions of NPF4 Policy 30 and ABC 2015 Policies
LDP 5, SG LDP TOUR 1 and SG LDP TOUR 3 which have already been applied to the
assessment of this matter. No substantive change to previous assessment.
Policy 34 – Electric Vehicle Charging - This policy sets out a requirement for all new non-
residential developments that attract a significant number of vehicles to have a minimum of 1
EV charging point for every five proposed parking spaces and for dedicated cable ducting to
be installed to allow all remaining such parking spaces to be provided with a charging point in
the future. In the case of this specific planning application, it is not considered that the
proposed small scale development would attract a significant number of vehicles sufficient to
warrant a requirement for two EV charging points plus cabling for the potential retro-fitting of
the remaining eight of the proposed ten parking spaces. In addition, this matter has already
been addressed in the applicant’s supporting statements where it is acknowledged that the
existing Portsonachan Hotel development already has two EV charging points which will be
made available to serve the currently proposed site if required. No substantive change to
previous assessment.
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes - Sets out
that the acceptance of development utilising existing public roads is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority and Planning
Authority. In this instance it has been identified by the Roads Authority that the existing public
road serving the development is substandard and unsuited to accommodate additional
development without commensurate improvement. The required improvement measures have
been agreed with the developer and can be secured by planning condition. The proposed
development is therefore aligned to the provisions of NPF4 Policy 13 as underpinned by LDP
Policies LDP 11, SG LDP TRAN 2, SG LDP TRAN 4, SG LDP TRAN 5 and SG LDP TRAN 6
which have already been applied to the assessment of this matter. No substantive change to
previous assessment. 
Policy 36 – New Private Access: Sets out the circumstances where a new private access may
be considered to be acceptable. In this instance the proposal would connect to the public road
by a private access connection and would be consistent with the principles of Policy 36a. No
substantive change to previous assessment.
Page 5

Page 6

Policy 39 - Construction Standards for Private Access – Sets out the construction standards
to be applied for private accesses and is generally aligned with the provisions of NPF4 Policy
13 and ABC 2015 Policy LDP 9, LDP 11, SG LDP TRAN 2, SG LDP TRAN 4, SG LDP TRAN
5 and SG LDP TRAN 6 and SG LDP Sustainable Design which have already been applied to
the assessment of this matter. No substantive change to previous assessment.
Policy 40 – Vehicle Parking Provision - Sets out standards for off street car and vehicle
parking. The proposed provision of 10 onsite parking spaces would be consistent with the
requirements of Policy 40. No substantive change to previous assessment.
Policy 41 – Offsite Highway Improvements: Sets out an expectation that where new
development would be served by a substandard private or public approach road then it will
contribute proportionately to improvements to an agreed section of the public or private road
network. A detailed assessment is set out in the main report of handling of this aspect in
relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and SG LDP TRAN 5. No
substantive change to previous assessment.
Policy 58 – Private Water Supplies and Water Conservation – Sets out support in principle for
the use of private water supplies subject to various criteria and is generally aligned with the
provisions of NPF4 Policy 18 and ABC LDP 2015 policies LDP DM 10, LDP DM 11 and SG
LPD SERV 6. No substantive change to previous assessment.
Policy 60 – Private Sewage Treatment Plans and Wastewater Drainage – Sets out that
connection to an existing public sewer will be required unless various criteria apply. In the
case of the specific development proposed, there is no existing public sewer available and the
proposal is advanced on the basis of connection to a new private sewage treatment plant. The
proposal is aligned with NPF4 Policies 18 and 22 in this regard as underpinned by ABC LDP
2015 policies LDP DM 10, LDP DM 11 and SG LPD SERV 1. No substantive change to
previous assessment.
Policy 61 – Sustainable Drainage Systems (SUDS) - Sets out a requirement that proposal for
SuDS are required in relation to all development prior to determination. The proposed
development has been designed according to CIRIA C753 and Sewers for Scotland 4th Edition
and has been deemed acceptable by the Council’s flooding advisors. This is generally aligned
to the existing NPF4 Policy 22 and ABC LDP 2015 policies LDP 10 and SG LDP SERV 2. No
substantive change to previous assessment.
Policy 63 – Waste Related Development and Waste Management – Sets out the provision for
waste storage and collection facilities in new developments and is aligned with the provisions
of NPF4 Policy 12 and ABC LDP 2015 policies LDP 10 and SG LDP SERV 5(b). No
substantive change to previous assessment.
Policy 71 – Development Impact on Local Landscape Area (LLA) – Sets out that the Council
will resist development having a significant adverse impact upon the character and qualities
of the landscape within an LLA unless two specific criteria apply. In the case of the current
development, whilst the site is located within the North Argyll APQ it will not result in a
significantly visually intrusive development within the site, the wider landscape or the APQ.
This assessment is aligned with the provisions of NPF4 Policy 4 and ABC LDP 2015 policies
LDP 3, SG LDP ENV 13 and SG LDP ENV 14. No substantive change to previous assessment.
Policy 73 – Development Impact on Habitats, Species and Biodiversity – Development Impact
on Sites of International and National Importance. Encourages protection and enhancement
of local biodiversity and affords protection to species and habitat and is aligned with the
provisions of NPF4 Policy 3 and ABC LDP 2015 policies LDP3 and SG LDP ENV 1. The
proposed development has been designed to afford protection and enhancement measures
and there are no substantive changes to the previous assessment.
Page 6

Page 7

Policy 77 – Forestry, Woodland and Trees - Sets out criteria for the assessment of
development impact on woodland and trees. The provisions of Policy 77 are aligned with the
requirements of NPF4 Policy 6; ABC LDP 2015 Policy LDP 3, and SG LDP ENV 6 which have
already been applied to the assessment of this matter. No substantive change to previous
assessment.
4.0 CONCLUSION
Proposed Local Development Plan 2 as recommended to be modified by the Examination
Report is now a significant material consideration. However, in this case there is no significant
material change of policy between the Adopted Plan and Proposed Local Development Plan
2 as recommended to be modified by the Examination Report that would require further
assessment or lead to a change in the recommendation.
5.0 RECOMMENDATION 
Recommend that the application be determined in accordance with the Head of Development
& Economic Growth’s report dated 1st June 2023.
Author of Report: Tim Williams  Date: 20th June 2023
Reviewing Officer:  Sandra Davies Date: 20th June 2023 
Fergus Murray 
Head of Development and Economic Growth 
Page 7

Page 8

This page is intentionally left blank

Page 9

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 22/01611/PP    
Planning Hierarchy: Local 
Applicant: Mr Colin Campbell   
Proposal: Erection of Decking and Fencing (retrospective) 
Site Address: 3 Academy Terrace, Academy Road, Rothesay, Isle of Bute    
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to advise Members that the Examination by Scottish Government
Reporters into the Argyll and Bute Proposed Local Development Plan 2 has now concluded
and the Examination Report has been published. The Examination Report is a material
consideration of significant weight. Consequently, the Proposed Local Development Plan 2 as
recommended to be modified by the Examination Report and the published Non Notifiable
Modifications is a material consideration in the determination of all planning and related
applications. 
2.0 RELEVANT PLDP2 POLICIES 
Spatial and Settlement Strategy
Policy 01 - Settlement Areas 
High Quality Places
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking 
Policy 08 – Sustainable Siting 
Policy 09 – Sustainable Design 
Policy 10 – Design – All Development 
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic Built
Environment
Policy 16 – Listed Buildings
Page 9 Agenda Item 6

Page 10

High Quality Environment
Policy 71 – Development Impact on Local Landscape Areas (LLA’s) 
3.0 IMPLICATIONS OF PLDP 2 AS RECOMMENDED TO BE MODIFIED BY THE
EXAMINATION REPORT
The assessment of the proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows:
Policy 01 – Settlement Areas: The proposal is located within the Settlement Area for Rothesay
as identified in PDLP2. The provisions of Policy 01 continues to set out general support for
development within the settlement area. No substantive change to previous assessment. 
Policy 04 – Sustainable Development: Promotes the principles of sustainable development
and remain generally aligned with the requirements of ABC LDP STRAT 1 and NPF 4 Policies
1 and 2 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 05 – Design and Placemaking: Sets out principles for achieving good quality places and
is generally aligned with the requirements of ABC LDP 2015 Policy LDP 9 and SG LDP
Sustainable Design, and NPF4 Policy 14 which have already been applied to the assessment
of this matter. No substantive change to previous assessment.
Policy 08 – Sustainable Siting: Sets out the principles for successfully integrating new
development into its landscape/townscape setting and is aligned with the provisions of NPF4
and ABC 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been
applied to the assessment of this matter. No substantive change to previous assessment.
Policy 09 – Sustainable Design: Sets out that development proposals should demonstrate
consideration of and, where possible, utilisation of renewable sources of energy and
sustainable design and construction methods. This is aligned with the provisions of NPF4 and
ABC 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been applied to
the assessment of this matter and, therefore, no substantive change to previous assessment.
Policy 10 – Design – All Development: Sets out requirements for the design of new
development and is generally aligned with the provisions of NPF4 and ABC 2015 Policy LDP
9 and SG LDP Sustainable Design which have already been applied to the assessment of this
matter. No substantive change to previous assessment.
Policy 15 – Supporting the Protection, Conservation and Enhancement of our Historic Built
Environment: Sets out that development will not be supported where it fails to protect,
conserve or enhance the special characteristics and/or cultural significance of the historic built
environment, or to avoid any cumulative effect upon the integrity or special qualities of heritage
assets. Policy 15 is aligned with the aims of NPF4 Policy 7 and ABC LDP 2015 Policy LDP 3
which have already been applied to the assessment of this matter. No substantive change to
previous assessment.
Policy 16 – Listed Buildings: Sets out requirements for development which affects a listed
building or its wider setting. The aims of Policy 16 are aligned with the aims of NPF4 Policy 7
and ABC LDP 2015 Policy LDP 3 which have already been applied to the assessment of this
matter. No substantive change to previous assessment. 
Page 10

Page 11

Policy 71 – Development Impact on Local Landscape Areas: Sets out requirements for
development which affects Local Landscape Areas. The aims of Policy 71 are aligned with the
aims of NPF4 Policy 4 and ABC LDP 2015 Policy LDP 3 which have already been applied to
the assessment of this matter. No substantive change to previous assessment. 
4.0 CONCLUSION
Proposed Local Development Plan 2 as recommended to be modified by the Examination
Report is now a significant material consideration. However, in this case there is no significant
material change of policy between the Adopted Plan and Proposed Local Development Plan
2 as recommended to be modified by the Examination Report that would require further
assessment or lead to a change in the recommendation. 
5.0 RECOMMENDATION 
Recommend that the application be determined in accordance with the Head of Development
& Economic Growth’s report dated 1st June 2023. 
Author of Report: Steven Gove   Date: 19th June 2023 
Reviewing Officer:  Kirsty Sweeney  Date:  19th June 2023 
Fergus Murray 
Head of Development and Economic Growth 
Page 11

Page 12

This page is intentionally left blank

Page 13

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:  22/02376//PP    
Planning Hierarchy: National 
Applicant:   Scottish Hydro Electric Transmission Plc  
Proposal:   To construct and operate a 275 kilovolt (kV) Electricity Substation and  
associated infrastructure. The works will comprise cut and fill to tie the  
platform into the existing ground level landscaping, Sustainable 
Drainage Systems (SuDS) basins, new permanent access and 
upgrades to existing tracks 
Site Address:    Land Approx 1.6km North West of Minard and Upslope of the existing  
Crarae Substation, Minard 
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to:
a) Update Members that the holding Objection by SEPA in respect of the proposals has now
been withdrawn subject to the imposition of the following condition which would replace
conditions 7 set out in the main report.
New Condition 7
No development shall commence until a detailed peat management and reinstatement plan
has been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior to
the intended commencement of development date and include details of :               
 The written consent of  all  landowners whose land is to be utilised 
 Methodology and volume of extraction, 
 Phasing/timing of any works impacting peat
 Quality/classification of Peat to be extracted
 Details of any onsite peat re-instatement and /or enhancement 
 Details of storage and transportation
 Details of the location, area and condition of onsite or offsite peatland to be  improved 
Page 13 Agenda Item 7

Page 14

 Details of peat enhancement measures on this land 
 Details of peatland restoration outcomes to be achieved
 Details of ongoing management arrangements of the restored peatland
The restored peatland shall thereafter be maintained in accordance with the terms of the
approved peatland management plan, and retained in perpetuity unless with the written
agreement of the Planning Authority in consultation with SEPA. The restored area shall not
be subject to any works or operations in the future to undermine the objectives of the
restoration objectives contained in the approved Peat Management Plan.
The peat improvement works shall also be undertaken in accordance with the objectives of
the necessary habitat and management plan set out at condition 08 below.
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement,
reuse and management of peat in accordance with NPF 4 Policy 5 (c) objectives.
The Concerns previously raised by SEPA have now been addressed through the submission
of further information by the applicants and additional requirements added to the proposed
condition. 
b)  Advise Members that the Examination by Scottish Government Reporters into the Argyll
and Bute Proposed Local Development Plan 2 has now concluded and the Examination
Report has been published. The Examination Report is a material consideration of significant
weight. Consequently, the Proposed Local Development Plan 2 as recommended to be
modified by the Examination Report and the published Non Notifiable Modifications is a
material consideration in the determination of all planning and related applications.
2.0 RELEVANT PLDP2 POLICIES
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
Policy 06 – Green Infrastructure 
Policy 08 – Sustainable Siting 
Policy 09 – Sustainable Design 
Policy 10 – Design – All Development 
Policy 30 - The Sustainable Growth of Renewables
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses 
Policy 61 – Sustainable Drainage Systems (SUDS) 
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development
Impact on Sites of International and National Importance.
Policy 77 – Forestry, Woodland and Trees 
Policy 79 – Protection of Soil and Peat Resources 
3.0 IMPLICATIONS OF PLDP 2 AS RECOMMENDED TO BE MODIFIED BY THE
EXAMINATION REPORT
Page 14

Page 15

The assessment of the proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows:
The assessment of the proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows: 
Policy 02 - Development Outside Settlement Areas: will only be acceptable where it can be
demonstrated that it falls within with indicated criteria. In this instance Parts A and B of the
policy are applicable. The proposal accords with Parts A and B as renewable infrastructure.
There is a presumption in favour of sustainable development where this is of an appropriate
scale, design, siting and use for its proposed location. No substantive change to previous
assessment. 
Policy 04 – Sustainable Development: Promotes the principles of sustainable development
and remain generally aligned with the requirements of ABC LDP STRAT 1 and NPF 4 Policies
1 and 2 which have already been applied to the assessment of this matter. No substantive
change to previous assessment. 
Policy 05 – Design and Placemaking: Sets out principles for achieving good quality places and
is generally aligned with the requirements of ABC LDP 2015 Policy LDP 9 and SG LDP
Sustainable Design, and NPF4 Policy 14 which have already been applied to the assessment
of this matter. No substantive change to previous assessment. 
Policy 06 – Green infrastructure: Sets out a requirement for the developer to demonstrate how
green infrastructure has been integrated into the design of the proposal from the outset. This
policy overlaps with provisions elsewhere to consider enhancements to biodiversity and
sustainable urban drainage which have already been applied to the assessment of this matter.
No substantive change to previous assessment. 
Policy 08 – Sustainable Siting: Sets out the principles for successfully integrating new
development into its landscape/townscape setting and is aligned with the provisions of NPF4
and ABC 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been
applied to the assessment of this matter. No substantive change to previous assessment. 
Policy 09 – Sustainable Design: Sets out that development proposals should demonstrate
consideration of and where possible utilisation of renewable sources of energy; and
sustainable design and construction methods. No substantive change to previous
assessment. 
Policy 10 – Design – All Development: Sets out requirements for the design of new
development and is generally aligned with the provisions of NPF4 and ABC 2015 Policy LDP
9 and SG LDP Sustainable Design which have already been applied to the assessment of this
matter. No substantive change to previous assessment.  
Policy 30 - The Sustainable Growth of Renewables: Policy 30  supports renewable energy
developments where these are consistent with the principles of sustainable development and
it can be adequately demonstrated that there would be no unacceptable environmental effects,
whether individual or cumulative, on local communities, natural and historic environments,
landscape character and visual amenity, and that the proposals would be compatible with
adjacent land uses.  This should be read in the context of the development plan as a whole
including the objectives and principles of NPF4 and its topic specific policies including Policy
11.  The current proposals are an essential part of the provision of a robust renewable energy
transmission network vital to address climate change and are therefore considered to accord
Page 15

Page 16

with the objectives of policy 30.  A detailed assessment of such matters is contained within
the main report of handling. No substantive change to previous assessment. 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes: Sets out
that the acceptance of development utilising existing public roads is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority and Planning
Authority.  A detailed assessment is set out in the main report of handling of this aspect in
relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and SG LDP TRAN 5.  No
substantive change to previous assessment.  
Policy 36 – New Private Access: Sets out the circumstances where a new private access may
be considered to be acceptable. No substantive change to previous assessment. 
Policy 61 – Sustainable Urban Drainage Systems: Sets out a requirement that proposal for
SuDS are required in relation to all development prior to determination. The proposal has been
amended to include detail that SuDS are to be designed and installed in accordance to BRE
Digest 365 Soakaway Design and BSEN - 752-4. No substantive change to previous
assessment. 
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development Impact
on Sites of International and National Importance. The provisions of Policy 73 are generally
aligned with the requirements of NPF4 Policy 3, and ABC LDP 2015 Policy LDP 3 and Sg LDP
ENV 1 which have already been applied to the assessment of this matter. No substantive
change to previous assessment. 
Policy 77 – Forestry, Woodland and Trees: Sets out criteria for the assessment of
development impact on woodland and trees. The provisions of Policy 77 are aligned with the
requirements of NPF4 Policy 6; ABC LDP 2015 Policy LDP 3, and SG LDP ENV 6 which have
already been applied to the assessment of this matter. No substantive change to previous
assessment. 
Policy 79 – Protection of Soil and Peat Resources: Sets out that the Council will only support
development where appropriate measures are taken to maintain soil resources and functions
through measures that are proportionate to the development. Policy 79 is aligned with the
provisions of NPF4 Policy 5 which have already been applied to the assessment of this matter.
No substantive change to previous assessment.
4.0 CONCLUSION
Proposed Local Development Plan 2 as recommended to be modified by the Examination
Report is now a significant material consideration. However, in this case there is no significant
material change of policy between the Adopted Plan and Proposed Local Development Plan
2 as recommended to be modified by the Examination Report that would require further
assessment or lead to a change in the recommendation.
5.0 RECOMMENDATION
It is recommended that planning permission be approved subject to the revised conditions
listed in Appendix 1 of supplementary report no.1.
Author of Report: David Moore   Date: 19.06.23
Reviewing Officer:  Sandra Davies  Date: 20.06.23
Fergus Murray 
Head of Development and Economic Growth
Page 16

Page 17

Appendix 1 
1. The development shall be implemented in accordance with the details specified on the
application form dated 23.11.22; the Environmental Appraisal (November 2022), supporting
information and, the approved drawings listed in the table below unless the prior written
approval of the planning authority is obtained for an amendment to the approved details
under Section 64 of the Town and Country Planning (Scotland) Act 1997.  
Plan Title. Plan Ref. No. Version Date Received
Site Location Plan A01 A01 23.12.22
Figure 1.1 Red
Line Boundary
1:20000
A01 A01 23.12.22
Site Layout Plan 4534c-DR-P-0017 Rev.5 26.05.23
Substation
Compound Layout
and Electrical
Section Locations
4534c-DR-P-0004 Rev.3 23.12.22
Proposed Site
Access Profiles
4534c-DR-P-0021   06.12.22
Proposed Site
Profiles
4534c-DR-P-0018 Rev.1 06.12.22
Site Access Details 4534c-DR-P-0008 Rev.1 24.11.22
Typical Access
Track Sections –
Sheet 1
4534c-DR-P-0007 Rev.2 24.11.22
Typical Access
Track Sections –
Sheet 2
4534c-DR-P-0012 Rev.2 24.11.22
Typical Deer Fence
and Gate
4534c-DR-P-0016   24.11.22
2.5m High Security
Palisade Fencing
Details
CE/34/2015 Rev.E  
Electrical Layout
Elevations 01
4534c-DR-P-0011 Rev.1 24.11.22
Generator
Building Elevations
4534c-DR-P-0009 Rev.2 24.11.22
Substation
Building Elevations
4534c-DR-P-0006 Rev.2 24
Substation
Building Layout
4534c-DR-P-0005 Rev.1 24.11.22
Transformer
Building Elevations
4534c-DR-P-0019 Rev.1 24.11.22
Page 17

Page 18

Transformer
Building Layout
4534c-DR-P-0020 Rev.1 24.11.22
Septic Tank and
Private Water
Supply Location
A01( Dated 16.12.22) A0! 23.12.22  
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.    
2. No construction works shall be commenced until a Finalised Construction Environmental
Management Document [CEMD] has been submitted to and approved in writing by the
Planning Authority, in consultation with SEPA and other consultees, as appropriate. The
development shall then proceed in accordance with the approved CEMD unless otherwise
agreed in writing by the Planning Authority. The CEMD shall include:
a. An updated Schedule of Mitigation (SM) highlighting mitigation set out within each
chapter of the Environmental Appraisal (EA), and the conditions of this consent;
b. Processes to control/ action changes from the agreed SM;
c. Construction Environmental Management Plans (CEMPs) for the construction phase
covering:
i. Habitat and species protection, including ECoW Details, surveys and species
protection plans;
ii. Landscape and Mitigation Restoration Plan including compensatory planting (refer
to Condition 9);
iii. Pollution prevention and control;
iv. Dust management, including construction activity and vehicle movements;
v. Construction noise and vibration
vi. Temporary site lighting;
vii. Watercourse crossings;
viii. Site waste management
ix. Surface and ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of high
flow or high rainfall; and a programme of water quality monitoring;
x. Mapping of borrow pits and associated habitats identified for restoration;
xi. Invasive Non-Native Species Management Plan
xii. Emergency Response Plans;
xiii. Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and 
xiv. Other relevant environmental management as may be relevant to the development
d. A statement of responsibility to ‘stop the job/ activity’ if a breach or potential
breach of mitigation or legislation occurs; and
e. Methods of monitoring, auditing, reporting and the communication of
environmental management on site and with client, Planning Authority, and other
relevant parties.
Page 18

Page 19

Reason: To ensure protection of surrounding environmental interests and general amenity. 
3. No development shall commence until a Construction Traffic Management Plan (CTMP) and
Phased Delivery Plan have been prepared and approved in writing by the Planning Authority
and Transport Scotland as the trunk roads Authority. The Plan shall include details of:
a. Approved access routes, 
b. Agreed operational practises (including avoidance of convoy movements, specifying
conduct in use of passing places, identification of turning areas, information of
wheel cleansing facilities, signage to be installed on the A83 warning of construction
traffic, signage or temporary traffic control measures to include for larger or
abnormal loads, reporting of verge damage); 
c. The provision of an appropriate Code of Practice to drivers of construction and
delivery vehicles. 
d. Abnormal load route surveys and finalised plan (including any accommodation
measures required including the removal of street furniture, junction widening,
traffic management).  
The development shall be implemented in accordance with the duly approved Traffic
Management Plan  
Reason: To minimise the interference with the safety and free flow of traffic on the trunk
road and to ensure that the transportation of abnormal loads will not have any detrimental
effect on the trunk road network.  
4. No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. The scheme shall be prepared by a suitably qualified
person and shall provide for the recording, recovery and reporting of items of interest or
finds within the application site. Thereafter the development shall be implemented in
accordance with the duly approved details with the suitably qualified person being afforded
access at all reasonable times during ground disturbance works. 
Reason: In order to protect archaeological resources  
5. No development shall commence, until a strategy for housing incoming construction
workers shall be submitted to and approved in writing by the Planning Authority. Thereafter
the development shall be carried out in accordance with the approved details. 
Page 19

Page 20

Reason: In order to ensure that any potential adverse impacts on the functioning of the local
housing market and tourist accommodation to the detriment of the interests of the local
community are identified and mitigated in accordance with the requirements of NPF4, and in
particular Policy 11C and Policy 25 Objectives. 
6. No development shall commence until an appraisal of the wholesomeness and sufficiency of
the intended private water supply and the system required to serve the development has
been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other suitably
competent person and shall include a risk assessment having regard to the requirements of
Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006 or Part 3 of the Water
Intended for Human Consumption (Private Supplies) (Scotland) Regulations 2017 (as
appropriate) which shall inform the design of the system by which a wholesome and
sufficient water supply shall be provided and maintained. The appraisal shall also
demonstrate that the wholesomeness and sufficiency of any other supply in the vicinity of
the development, or any other person utilising the same source or supply, shall not be
compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water supply
system has been installed in accordance with the agreed specification and is operational. 
Reason: In the interests of public health and in order to ensure that an adequate private
water supply in terms of both wholesomeness and sufficiency can be provided to meet the
requirements of the proposed development and without compromising the interests of other
users of the same or nearby private water supplies. 
7. No development shall commence until a detailed peat management and reinstatement plan
has been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior
to the intended commencement of development date and include details of :               
 The written consent of all landowners whose land is to be utilised 
 Methodology and volume of extraction, 
 Phasing/timing of any works impacting peat
 Quality/classification of Peat to be extracted
 Details of any onsite peat re-instatement and /or enhancement 
 Details of storage and transportation
Page 20

Page 21

 Details of the location, area and condition of onsite or offsite peatland to be 
improved 
 Details of peat enhancement measures on this land 
 Details of peatland restoration outcomes to be achieved
 Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of the
approved peatland management plan, and retained in perpetuity unless with the written
agreement of the Planning Authority in consultation with SEPA. 
The restored area shall not be subject to any works or operations in the future to undermine
the objectives of the restoration objectives contained in the approved Peat Management
Plan. 
The peat improvement works shall also be undertaken in accordance with the objectives of
the necessary habitat and management plan set out at condition 08 below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement,
reuse and management of peat in accordance with NPF 4 Policy 5 (c) objectives. 
8. No works to excavate any peat on the site shall be undertaken until a Habitat Management
and Enhancement Plan has been submitted to and approved by the Planning Authority in
consultation with its biodiversity advisor. 
Reason: To ensure that works result in habitat enhancement works being undertaken in
accordance with NPF 4 and LDP Objectives. 
9 No development shall commence until a detailed Compensatory Planting Plan (CPP) and
Long Term Forestry Management Plan (LTFMP) are submitted to and approved in writing by
the Planning Authority, in consultation with Scottish Forestry. The approved CPP and LTFMP
shall be implemented in full and in accordance with the approved timing, unless otherwise
agreed in writing by the Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net loss in
woodland related public benefit, in accordance with the Scottish Government's policy on the
Control of Woodland Removal.
Page 21

Page 22

10. No development shall commence until a revised Landscape Planting Plan and Maintenance
Plan in accordance with BS EN ISO 11091:1999 has been submitted to and approved in
writing by the Planning Authority. The revised plans must include:
a. A plan showing numbers and locations of each tree and shrub species;
b. Planting schedule to show for each species, the total number, type and size at
planting;
c. Specification for planting to include ground preparation, planting operations and
protection from herbivores;
d. Compensatory planting scheme for tree loss
e. Schedule of implementation and phasing;  
The approved Landscape Planting Plan and Maintenance Plan shall thereafter be
implemented in full in accordance with the implementation schedule and maintained in
accordance with the approved details. Any plant losses within the first five years will be
replaced at the next planting season.  
Reason: To ensure the development conserves and enhances the landscape character and
biodiversity interests of the area. 
11. Any watercourse crossings, hereby permitted, shall be designed to at least the capacity of
the existing channel and to the 1 in 200 year plus climate change flow and an allowance for
freeboard, unless otherwise agreed in writing by the Planning Authority.   
Reason: To ensure that new watercourse crossings do not affect the existing flows in the
interests of flood risk. 
12. No external lighting shall be installed on the site other than with the prior written approval
of the planning authority. In that event the location, type and luminance of the lighting units
to be installed shall be specified, and any duly approved lighting shall be installed in a
manner which minimises illumination and glare outwith the boundary of the application
site. The completed site shall not be illuminated other than in the event of staff being
present on site. 
Reason: In order to avoid unnecessary visual intrusion in the interests of the visual amenity
of an area otherwise unaffected by the presence of light sources. 
13 No development/works shall take place outside the following hours;
0800 – 1800 hours Monday to Friday,
Page 22

Page 23

0800 – 1300 hours Saturday 
Not at all on Sunday, Bank or Scottish Public Holidays. 
Reason: To minimise the impact of noise, generated by construction activities, on occupiers
of residential properties.
14. No development shall commence until a noise management strategy and plan has been
submitted to the Planning Authority for its approval in consultation with its Environmental
Protection advisors. This shall set out the hours of associated with proposed vehicular
movements which could potentially disturb residential occupiers. Such details as may be
approved shall thereafter be adhered to unless with the written authority of Environmental
Health Officers. 
Reason: To safeguard residential amenity 
Page 23

Page 24

This page is intentionally left blank

Page 25

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:  22/02578/PP    
Planning Hierarchy: National 
Applicant:   Scottish Hydro Electric Transmission Plc  
Proposal:   Erection of high voltage electricity substation and formation of
associated access, landscaping, drainage and means of enclosure
(Craig Murrail substation) 
Site Address:  Achnabreck Forest - Land Approximately 2.5 Km North East Of
Lochgilphead And 4 Km South West Of Loch Glashan, Lochgilphead.
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to:
a) Update Members that the holding Objection by SEPA in respect of the proposals has now
been withdrawn subject to the imposition of the following condition which would replace
conditions 7 set out in the main report.
New Condition 7
No development shall commence until a detailed peat management and reinstatement plan
has been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior to
the intended commencement of development date and include details of :               
 The written consent of  all  landowners whose land is to be utilised 
 Methodology and volume of extraction, 
 Phasing/timing of any works impacting peat
 Quality/classification of Peat to be extracted
 Details of any onsite peat re-instatement and /or enhancement 
 Details of storage and transportation
 Details of the location, area and condition of onsite or offsite peatland to be  improved 
 Details of peat enhancement measures on this land 
Page 25 Agenda Item 8

Page 26

 Details of peatland restoration outcomes to be achieved
 Details of ongoing management arrangements of the restored peatland
The restored peatland shall thereafter be maintained in accordance with the terms of the
approved peatland management plan, and retained in perpetuity unless with the written
agreement of the Planning Authority in consultation with SEPA. The restored area shall not
be subject to any works or operations in the future to undermine the objectives of the
restoration objectives contained in the approved Peat Management Plan.
The peat improvement works shall also be undertaken in accordance with the objectives of
the necessary habitat and management plan set out at condition 08 below.
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement,
reuse and management of peat in accordance with NPF 4 Policy 5 (c) objectives.
The Concerns previously raised by SEPA have now been addressed through the submission
of further information by the applicants and additional requirements added to the proposed
condition. 
b)  Advise Members that the Examination by Scottish Government Reporters into the Argyll
and Bute Proposed Local Development Plan 2 has now concluded and the Examination
Report has been published. The Examination Report is a material consideration of significant
weight. Consequently, the Proposed Local Development Plan 2 as recommended to be
modified by the Examination Report and the published Non Notifiable Modifications is a
material consideration in the determination of all planning and related applications.
2.0 RELEVANT PLDP2 POLICIES
Policy 02 – Outwith Settlement Areas 
Policy 04 – Sustainable Development  
Policy 06 – Green Infrastructure  
Policy 08 – Sustainable Siting  
Policy 09 – Sustainable Design  
Policy 10 – Design – All Development  
Policy 30 - The Sustainable Growth of Renewables 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes 
Policy 36 – New Private Accesses  
Policy 61 – Sustainable Drainage Systems (SUDS)  
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development
Impact on Sites of International and National Importance. 
Policy 77 – Forestry, Woodland and Trees  
Policy 79 – Protection of Soil and Peat Resources  
3.0 IMPLICATIONS OF PLDP 2 AS RECOMMENDED TO BE MODIFIED BY THE
EXAMINATION REPORT
Page 26

Page 27

The assessment of the proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows:
The assessment of the proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows: 
Policy 02 - Development Outside Settlement Areas: will only be acceptable where it can be
demonstrated that it falls within with indicated criteria. In this instance Parts A and B of the
policy are applicable. The proposal accords with Parts A and B as renewable infrastructure.
There is a presumption in favour of sustainable development where this is of an appropriate
scale, design, siting and use for its proposed location. No substantive change to previous
assessment. 
Policy 04 – Sustainable Development: Promotes the principles of sustainable development
and remain generally aligned with the requirements of ABC LDP STRAT 1 and NPF 4 Policies
1 and 2 which have already been applied to the assessment of this matter. No substantive
change to previous assessment. 
Policy 05 – Design and Placemaking: Sets out principles for achieving good quality places and
is generally aligned with the requirements of ABC LDP 2015 Policy LDP 9 and SG LDP
Sustainable Design, and NPF4 Policy 14 which have already been applied to the assessment
of this matter. No substantive change to previous assessment. 
Policy 06 – Green infrastructure: Sets out a requirement for the developer to demonstrate how
green infrastructure has been integrated into the design of the proposal from the outset. This
policy overlaps with provisions elsewhere to consider enhancements to biodiversity and
sustainable urban drainage which have already been applied to the assessment of this matter.
No substantive change to previous assessment. 
Policy 08 – Sustainable Siting: Sets out the principles for successfully integrating new
development into its landscape/townscape setting and is aligned with the provisions of NPF4
and ABC 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been
applied to the assessment of this matter. No substantive change to previous assessment. 
Policy 09 – Sustainable Design: Sets out that development proposals should demonstrate
consideration of and where possible utilisation of renewable sources of energy; and
sustainable design and construction methods. No substantive change to previous
assessment. 
Policy 10 – Design – All Development: Sets out requirements for the design of new
development and is generally aligned with the provisions of NPF4 and ABC 2015 Policy LDP
9 and SG LDP Sustainable Design which have already been applied to the assessment of this
matter. No substantive change to previous assessment. 
Policy 30 - The Sustainable Growth of Renewables: Policy 30  supports renewable energy
developments where these are consistent with the principles of sustainable development and
it can be adequately demonstrated that there would be no unacceptable environmental effects,
whether individual or cumulative, on local communities, natural and historic environments,
landscape character and visual amenity, and that the proposals would be compatible with
adjacent land uses.  This should be read in the context of the development plan as a whole
including the objectives and principles of NPF4 and its topic specific policies including Policy
11.  The current proposals are an essential part of the provision of a robust renewable energy
transmission network vital to address climate change and are therefore considered to accord
Page 27

Page 28

with the objectives of policy 30. A detailed assessment of such matters is contained within the
main report of handling. No substantive change to previous assessment.   
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes: Sets out
that the acceptance of development utilising existing public roads is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority and Planning
Authority.  A detailed assessment is set out in the main report of handling of this aspect in
relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and SG LDP TRAN 5.  No
substantive change to previous assessment.  
Policy 36 – New Private Access: Sets out the circumstances where a new private access may
be considered to be acceptable. No substantive change to previous assessment. 
Policy 61 – Sustainable Urban Drainage Systems: Sets out a requirement that proposal for
SuDS are required in relation to all development prior to determination. The proposal has been
amended to include detail that SuDS are to be designed and installed in accordance to BRE
Digest 365 Soakaway Design and BSEN - 752-4. No substantive change to previous
assessment. 
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development Impact
on Sites of International and National Importance. The provisions of Policy 73 are generally
aligned with the requirements of NPF4 Policy 3, and ABC LDP 2015 Policy LDP 3 and Sg LDP
ENV 1 which have already been applied to the assessment of this matter. No substantive
change to previous assessment. 
Policy 77 – Forestry, Woodland and Trees: Sets out criteria for the assessment of
development impact on woodland and trees. The provisions of Policy 77 are aligned with the
requirements of NPF4 Policy 6; ABC LDP 2015 Policy LDP 3, and SG LDP ENV 6 which have
already been applied to the assessment of this matter. No substantive change to previous
assessment. 
Policy 79 – Protection of Soil and Peat Resources: Sets out that the Council will only support
development where appropriate measures are taken to maintain soil resources and functions
through measures that are proportionate to the development. Policy 79 is aligned with the
provisions of NPF4 Policy 5 which have already been applied to the assessment of this matter.
No substantive change to previous assessment.
4.0 CONCLUSION
Proposed Local Development Plan 2 as recommended to be modified by the Examination
Report is now a significant material consideration. However, in this case there is no significant
material change of policy between the Adopted Plan and Proposed Local Development Plan
2 as recommended to be modified by the Examination Report that would require further
assessment or lead to a change in the recommendation.
5.0 RECOMMENDATION
It is recommended that planning permission be approved subject to the revised conditions
listed in Appendix 1 of supplementary report no.1.
Author of Report: David Moore   Date: 19.06.23
Reviewing Officer:  Sandra Davies  Date: 20.06.23
Fergus Murray 
Head of Development and Economic Growth
Page 28

Page 29

Appendix 1
1. The development shall be implemented in accordance with the details specified
on the application form dated 14.12.22; the Environmental Appraisal
(December 2022), supporting information and, the approved drawings listed in
the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the
Town and Country Planning (Scotland) Act 1997.  
Plan Title. Plan Ref. No. Version Date Received
Site Location Plan
1:75000
A01 A01 19.12.22
Site Location Plan
1:25000
A01 A01 19.12.22
Site Layout Plan 4534b-DR-P-0017 Rev.7 26.05.23
Substation
Compound Layout
and Electrical
Section Locations
4534b-DR-P-0004 Rev.3 16.01.23
Proposed Site
Access Profiles
4534b-DR-P-0021 - 19.12.22
Proposed Site
Profiles
4534b-DR-P-0018 Rev.2 19.12.22
Site Access Details 4534b-DR-P-0008 Rev.1 19.12.22
Typical Access
Track Sections –
Sheet 1
4534b-DR-P-0007 Rev.2 19.12.22
Typical Access
Track Sections –
Sheet 2
4534b-DR-P-0012 Rev.2 19.12.22
2.5m High Security
Palisade Fencing
Details
CE/34/2015 Rev. E 19.12.22
Electrical Layout
Elevations 01
4534b-DR-P-0011 Rev.1 19.12.22
Electrical layout
Elevations 02
4534b-DR-P-0014 Rev.2 19.12.22
Electrical Layout
Elevations 03
4534b-DR-P-0015 Rev.1 19.12.22
Generator Building
Elevations
4534b-DR-P-0009 Rev.2 19.12.22
Substation
Building Elevations
4534b-DR-P-0006 Rev.2 19.12.22
Substation
Building Layout
4534b-DR-P-0005 Rev.1 19.12.22
Transformer
Building Elevations
4534b-DR-P-0019 - 19.12.22
Transformer
Building Layout
4534b-DR-P-0020 - 19.12.22
Switch Room
Elevations
4534b-DR-P-0013   19.12.22
Switch Room Floor
Plans
4534b-DR-P-0010 Rev.1 19.12.22
Page 29

Page 30

Septic Tank and
Private Water
Supply Location
(15.12.22)
A01 A01 08.02.23  
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. No construction works shall be commenced until a Finalised Construction
Environmental Management Plan [CEMP] has been submitted to and approved
in writing by the Planning Authority, in consultation with SEPA and other
consultees, as appropriate. The development shall then proceed in accordance
with the approved CEMP unless otherwise agreed in writing by the Planning
Authority. The CEMP shall include:
a. An updated Schedule of Mitigation (SM) highlighting mitigation set out within
each chapter of the Environmental Appraisal (EA), and the conditions of this
consent;
b. Processes to control/ action changes from the agreed SM;
c. Construction Environmental Management Plans (CEMPs) for the construction
phase covering:
i. Habitat and species protection, including ECoW Details, surveys and species
protection plans;
ii. Landscape and Mitigation Restoration Plan including compensatory planting
(refer to Condition 9);
iii. Pollution prevention and control;
iv. Dust management, including construction activity and vehicle movements;
v. Construction noise and vibration
vi. Temporary site lighting;
vii. Watercourse crossings;
viii. Site waste management
ix. Surface and ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of
high flow or high rainfall; and a programme of water quality monitoring;
x. Mapping of borrow pits and associated habitats identified for restoration;
xi. Invasive Non-Native Species Management Plan
xii. Emergency Response Plans;
xiii. Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and 
xiv. Other relevant environmental management as may be relevant to the
development
d. A statement of responsibility to ‘stop the job/ activity’ if a breach or potential
breach of mitigation or legislation occurs; and
e. Methods of monitoring, auditing, reporting and the communication of
environmental management on site and with client, Planning Authority, and
other relevant parties.  
Page 30

Page 31

Reason: To ensure protection of surrounding environmental interests and general
amenity. 
3. No development shall commence until a Construction Traffic Management
Plan (CTMP) and Phased Delivery Plan have been prepared and approved in
writing by the Planning Authority and Transport Scotland as the trunk roads
Authority. The Plan shall include details of:
a. Approved access routes, 
b. Agreed operational practises (including avoidance of convoy movements,
specifying conduct in use of passing places, identification of turning areas,
information of wheel cleansing facilities, signage to be installed on the A83
warning of construction traffic, signage or temporary traffic control measures
to include for larger or abnormal loads, reporting of verge damage); 
c. The provision of an appropriate Code of Practice to drivers of construction
and delivery vehicles. 
d. Abnormal load route surveys and finalised plan (including any
accommodation measures required including the removal of street furniture,
junction widening, traffic management).  
The development shall be implemented in accordance with the duly approved Traffic
Management Plan  
Reason: To minimise the interference with the safety and free flow of traffic on the
trunk road and to ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk road network.  
4.  No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. The scheme shall be prepared by a suitably
qualified person and shall provide for the recording, recovery and reporting of items of
interest or finds within the application site. Thereafter the development shall be
implemented in accordance with the duly approved details with the suitably qualified
person being afforded access at all reasonable times during ground disturbance
works. 
Reason: In order to protect archaeological resources  
5. No development shall commence, until a strategy for housing incoming construction
workers shall be submitted to and approved in writing by the Planning Authority.
Thereafter the development shall be carried out in accordance with the approved
details. 
Page 31

Page 32

Reason: In order to ensure that any potential adverse impacts on the functioning of
the local housing market and tourist accommodation to the detriment of the interests
of the local community are identified and mitigated in accordance with the
requirements of NPF4, and in particular Policy 11C and Policy 25 Objectives. 
6.  No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006
or Part 3 of the Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 (as appropriate) which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate private
water supply in terms of both wholesomeness and sufficiency can be provided to meet
the requirements of the proposed development and without compromising the interests
of other users of the same or nearby private water supplies.  
7. No development shall commence until a detailed peat management and
reinstatement plan has been submitted to and approved by the Planning Authority in
consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months
prior to the intended commencement of development date and include details of :               
 The written consent of all landowners whose land is to be utilised 
 Methodology and volume of extraction, 
 Phasing/timing of any works impacting peat
 Quality/classification of Peat to be extracted
 Details of any onsite peat re-instatement and /or enhancement 
 Details of storage and transportation
Page 32

Page 33

 Details of the location, area and condition of onsite or offsite peatland to be 
improved 
 Details of peat enhancement measures on this land 
 Details of peatland restoration outcomes to be achieved
 Details of ongoing management arrangements of the restored peatland 
The restored peatland shall thereafter be maintained in accordance with the terms of
the approved peatland management plan, and retained in perpetuity unless with the
written agreement of the Planning Authority in consultation with SEPA. 
The restored area shall not be subject to any works or operations in the future to
undermine the objectives of the restoration objectives contained in the approved Peat
Management Plan. 
The peat improvement works shall also be undertaken in accordance with the
objectives of the necessary habitat and management plan set out at condition 08
below. 
Reason: In order to minimise disturbance of peat and ensure the appropriate
reinstatement, reuse and management of peat in accordance with NPF 4 Policy 5 (c)
objectives.   
8. No works to excavate any peat on the site shall be undertaken until a Habitat
Management and Enhancement Plan has been submitted to and approved by the
Planning Authority in consultation with its biodiversity advisor.  
Reason: To ensure that works result in habitat enhancement works being undertaken
in accordance with NPF 4 and LDP Objectives. 
9. No development shall commence until a detailed Compensatory Planting Plan
(CPP) and Long Term Forestry Management Plan (LTFMP) are submitted to and
approved in writing by the Planning Authority, in consultation with Scottish Forestry.
The approved CPP and LTFMP shall be implemented in full and in accordance with
the approved timing, unless otherwise agreed in writing by the Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net
loss in woodland related public benefit, in accordance with the Scottish Government's
policy on the Control of Woodland Removal.  
Page 33

Page 34

10. No development shall commence, until a revised Landscape Planting Plan and
Maintenance Plan in accordance with BS EN ISO 11091:1999 has been submitted to
and approved in writing by the Planning Authority. The revised plans must include:
a. A plan showing numbers and locations of each tree and shrub species;
b. Planting schedule to show for each species, the total number, type and size
at planting;
c. Specification for planting to include ground preparation, planting operations
and protection from herbivores;
d. Compensatory planting scheme for tree loss
e. Schedule of implementation and phasing;  
The approved Landscape Planting Plan and Maintenance Plan shall thereafter be
implemented in full in accordance with the implementation schedule and maintained
in accordance with the approved details. Any plant losses within the first five years will
be replaced at the next planting season.  
Reason: To ensure the development conserves and enhances the landscape
character and biodiversity interests of the area.  
11. Any watercourse crossings, hereby permitted, shall be designed to at least the
capacity of the existing channel and to the 1 in 200 year plus climate change flow and
an allowance for freeboard, unless otherwise agreed in writing by the Planning
Authority.    
Reason: To ensure that new watercourse crossings do not affect the existing flows in
the interests of flood risk.  
12. No external lighting shall be installed on the site other than with the prior written
approval of the planning authority. In that event the location, type and luminance of the
lighting units to be installed shall be specified, and any duly approved lighting shall be
installed in a manner which minimises illumination and glare outwith the boundary of
the application site. The completed site shall not be illuminated other than in the event
of staff being present on site.  
Reason: In order to avoid unnecessary visual intrusion in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources.  
13. No development shall take place outside the following hours:  
07.00hrs and 19.00hrs Mon to Friday (inclusive)
Page 34

Page 35

07.00hrs and 18.00hrs Saturday  
And not at all on Sundays or Scottish Bank Holidays unless as otherwise may be
agreed with Environmental Protection Officers in advance of the operations.  
Reason: To safeguard residential amenity 
Page 35

Page 36

This page is intentionally left blank

Page 37

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No:  23/00382/PP    
Planning Hierarchy: National 
Applicant:   Scottish Hydro Electric Transmission Plc  
Proposal:   Erection of high voltage electricity substation and formation of
associated access, landscaping, drainage and means of enclosure
(Crossaig (North) Substation)
Site Address: Land Adjacent To Crossaig Sub Station, Skipness . 
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION 
The purpose of this report is to:
a) Update Members that the holding Objection by SEPA in respect of the proposals has now
been withdrawn subject to the imposition of the following condition which would replace
condition 7 set out in the main report.
New Condition 7
No development shall commence until a detailed peat management and reinstatement plan
has been submitted to and approved by the Planning Authority in consultation with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months prior to
the intended commencement of development date and include details of :               
 The written consent of  all  landowners whose land is to be utilised 
 Methodology and volume of extraction, 
 Phasing/timing of any works impacting peat
 Quality/classification of Peat to be extracted
 Details of any onsite peat re-instatement and /or enhancement 
 Details of storage and transportation
 Details of the location, area and condition of onsite or offsite peatland to be  improved 
 Details of peat enhancement measures on this land 
 Details of peatland restoration outcomes to be achieved
Page 37 Agenda Item 9

Page 38

 Details of ongoing management arrangements of the restored peatland
The restored peatland shall thereafter be maintained in accordance with the terms of the
approved peatland management plan,and retained in perpetuity unless with the written
agreement of the Planning Authority in consultation with SEPA. The restored area shall not
be subject to any works or operations in the future to undermine the objectives of the
restoration objectives contained in the approved Peat Management Plan.
The peat improvement works shall also be undertaken in accordance with the objectives of
the necessary habitat and management plan set out at condition 08 below.
Reason: In order to minimise disturbance of peat and ensure the appropriate reinstatement,
reuse and management of peat in accordance with NPF 4 Policy 5 (c) objectives.
The Concerns previously raised by SEPA have now been addressed through the submission
of further information by the applicants and additional requirements added to the proposed
condition. 
b)  Advise Members that the Examination by Scottish Government Reporters into the Argyll
and Bute Proposed Local Development Plan 2 has now concluded and the Examination
Report has been published. The Examination Report is a material consideration of significant
weight. Consequently, the Proposed Local Development Plan 2 as recommended to be
modified by the Examination Report and the published Non Notifiable Modifications is a
material consideration in the determination of all planning and related applications.
2.0 RELEVANT PLDP2 POLICIES 
Policy 02 – Outwith Settlement Areas 
Policy 04 – Sustainable Development  
Policy 06 – Green Infrastructure  
Policy 08 – Sustainable Siting  
Policy 09 – Sustainable Design  
Policy 10 – Design – All Development  
Policy 30 - The Sustainable Growth of Renewables 
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes 
Policy 36 – New Private Accesses  
Policy 61 – Sustainable Drainage Systems (SUDS)  
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development
Impact on Sites of International and National Importance. 
Policy 77 – Forestry, Woodland and Trees  
Policy 79 – Protection of Soil and Peat Resources  
3.0 IMPLICATIONS OF PLDP 2 AS RECOMMENDED TO BE MODIFIED BY THE
EXAMINATION REPORT
The assessment of the proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows:
Page 38

Page 39

Policy 02 - Development Outside Settlement Areas: will only be acceptable where it can be
demonstrated that it falls within with indicated criteria. In this instance Parts A and B of the
policy are applicable. The proposal accords with Parts A and B as renewable infrastructure.
There is a presumption in favour of sustainable development where this is of an appropriate
scale, design, siting and use for its proposed location. No substantive change to previous
assessment.
Policy 04 – Sustainable Development: Promotes the principles of sustainable development
and remain generally aligned with the requirements of ABC LDP STRAT 1 and NPF 4 Policies
1 and 2 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 05 – Design and Placemaking: Sets out principles for achieving good quality places and
is generally aligned with the requirements of ABC LDP 2015 Policy LDP 9 and SG LDP
Sustainable Design, and NPF4 Policy 14 which have already been applied to the assessment
of this matter. No substantive change to previous assessment.
Policy 06 – Green infrastructure: Sets out a requirement for the developer to demonstrate how
green infrastructure has been integrated into the design of the proposal from the outset. This
policy overlaps with provisions elsewhere to consider enhancements to biodiversity and
sustainable urban drainage which have already been applied to the assessment of this matter.
No substantive change to previous assessment.
Policy 08 – Sustainable Siting: Sets out the principles for successfully integrating new
development into its landscape/townscape setting and is aligned with the provisions of NPF4
and ABC 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been
applied to the assessment of this matter. No substantive change to previous assessment.
Policy 09 – Sustainable Design: Sets out that development proposals should demonstrate
consideration of and where possible utilisation of renewable sources of energy; and
sustainable design and construction methods. No substantive change to previous
assessment.
Policy 10 – Design – All Development: Sets out requirements for the design of new
development and is generally aligned with the provisions of NPF4 and ABC 2015 Policy LDP
9 and SG LDP Sustainable Design which have already been applied to the assessment of this
matter. No substantive change to previous assessment.
Policy 30 - The Sustainable Growth of Renewables: Policy 30  supports renewable energy
developments where these are consistent with the principles of sustainable development and
it can be adequately demonstrated that there would be no unacceptable environmental effects,
whether individual or cumulative, on local communities, natural and historic environments,
landscape character and visual amenity, and that the proposals would be compatible with
adjacent land uses.  This should be read in the context of the development plan as a whole
including the objectives and principles of NPF4 and its topic specific policies including Policy
11.  The current proposals are an essential part of the provision of a robust renewable energy
transmission network vital to address climate change and are therefore considered to accord
with the objectives of policy 30. A detailed assessment of such matters is contained within the
main report of handling. No substantive change to previous assessment.   
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes: Sets out
that the acceptance of development utilising existing public roads is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority and Planning
Authority.  A detailed assessment is set out in the main report of handling of this aspect in
Page 39

Page 40

relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and SG LDP TRAN 5.  No
substantive change to previous assessment. 
Policy 36 – New Private Access: Sets out the circumstances where a new private access may
be considered to be acceptable. No substantive change to previous assessment.
Policy 61 – Sustainable Urban Drainage Systems: Sets out a requirement that proposal for
SuDS are required in relation to all development prior to determination. The proposal has been
amended to include detail that SuDS are to be designed and installed in accordance to BRE
Digest 365 Soakaway Design and BSEN - 752-4. No substantive change to previous
assessment.
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development Impact
on Sites of International and National Importance. The provisions of Policy 73 are generally
aligned with the requirements of NPF4 Policy 3, and ABC LDP 2015 Policy LDP 3 and Sg LDP
ENV 1 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 77 – Forestry, Woodland and Trees: Sets out criteria for the assessment of
development impact on woodland and trees. The provisions of Policy 77 are aligned with the
requirements of NPF4 Policy 6; ABC LDP 2015 Policy LDP 3, and SG LDP ENV 6 which have
already been applied to the assessment of this matter. No substantive change to previous
assessment.
Policy 79 – Protection of Soil and Peat Resources: Sets out that the Council will only support
development where appropriate measures are taken to maintain soil resources and functions
through measures that are proportionate to the development. Policy 79 is aligned with the
provisions of NPF4 Policy 5 which have already been applied to the assessment of this matter.
No substantive change to previous assessment.
4.0 CONCLUSION
Proposed Local Development Plan 2 as recommended to be modified by the Examination
Report is now a significant material consideration. However, in this case there is no significant
material change of policy between the Adopted Plan and Proposed Local Development Plan
2 as recommended to be modified by the Examination Report that would require further
assessment or lead to a change in the recommendation.
5.0 RECOMMENDATION
It is recommended that planning permission be approved subject to the revised conditions
listed in Appendix 1 of supplementary report no.1.
Author of Report: David Moore   Date: 19.06.23
Reviewing Officer:  Sandra Davies  Date: 20.06.23 
Fergus Murray 
Head of Development and Economic Growth 
Page 40

Page 41

Appendix 1
1. The development shall be implemented in accordance with the details specified on the
application form dated 14.12.22; the Environmental Appraisal (December 2022),
supporting information and, the approved drawings listed in the table below unless the
prior written approval of the planning authority is obtained for an amendment to the
approved details under Section 64 of the Town and Country Planning (Scotland) Act
1997.  
Plan Title. Plan Ref. No. Version Date Received
Site Location Plan A01 A01 24.2.23
Site Layout Plan 4534d-DR-P-0017 Rev.5 26.5.23
Existing Substation
Proposed Platform
Extension and Detail
4534d-DR-P-0027 - 24.2.23
Substation Compound
Layout and Electrical
Section Locations
4534d-DR-P-0004 Rev.2 24.2.23
Proposed Site Access
Profiles
4534d-DR-P-0021 Rev.1 24.2.23
Proposed Site Profiles 4534d-DR-P-0018 Rev.1 24.2.23
Site Access Details 4534d-DR-P-0008 Rev.2 24.2.23
Typical Deer Fence
and Gate
4534d-DR-P-0016 - 24.2.23
2.5m High Security
Palisade Fencing
Details
CE/34/2015 Rev. E 24.2.23
Electrical Layout
Elevations 01
4534d-DR-P-0011 Rev.1 24.2.23
Compound layout&
Electrical Section
Locations
4534d-DR_P-0004 Rev.2 24.2.23
Generator Building
Elevations and Floor
Plan
4534d-DR-P-0009 Rev.2 24.2.23
Control Building
Elevations
4534d-DR-P-0006 Rev.1 24.2.23
Control Building Layout 4534d-DR-P-0022 Rev.1 24.2.23
Control Building
Elevations
4534d-DR-P-0023 Rev.1 24.2.23        
Transformer Building
Elevations
4534d-DR-P-0019 Rev.1 24.2.23
Transformer Building
Layout
4534d-DR-P-0020 Rev.1 24.2.23  
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.    
Page 41

Page 42

2. No construction works shall be commenced until a Finalised Construction
Environmental Management Plan [CEMP] has been submitted to and approved in
writing by the Planning Authority, in consultation with SEPA and other consultees, as
appropriate. The development shall then proceed in accordance with the approved
CEMP unless otherwise agreed in writing by the Planning Authority. The CEMP shall
include:
a. An updated Schedule of Mitigation (SM) highlighting mitigation set out within
each chapter of the Environmental Appraisal (EA), and the conditions of this
consent;
b. Processes to control/ action changes from the agreed SM;
c. Construction Environmental Management Plans (CEMPs) for the construction
phase covering:
i. Habitat and species protection, including ECoW Details, surveys and species
protection plans;
ii. Landscape and Mitigation Restoration Plan including compensatory planting
(refer to Condition 9);
iii. Pollution prevention and control;
iv. Dust management, including construction activity and vehicle movements;
v. Construction noise and vibration
vi. Temporary site lighting;
vii. Watercourse crossings;
viii. Site waste management
ix. Surface and ground water management, including: drainage and sediment
management measures from all construction areas including access tracks,
mechanisms to ensure that construction will not take place during periods of
high flow or high rainfall; and a programme of water quality monitoring;
x. Mapping of borrow pits and associated habitats identified for restoration;
xi. Invasive Non-Native Species Management Plan
xii. Emergency Response Plans;
xiii. Timetable for post construction restoration/ reinstatement of the temporary
working areas and construction compound; and 
xiv. Other relevant environmental management as may be relevant to the
development
d. A statement of responsibility to ‘stop the job/ activity’ if a breach or potential
breach of mitigation or legislation occurs; and
e. Methods of monitoring, auditing, reporting and the communication of
environmental management on site and with client, Planning Authority, and
other relevant parties.  
Reason: To ensure protection of surrounding environmental interests and general
amenity. 
3. No development shall commence until a Construction Traffic Management Plan
(CTMP) and Phased Delivery Plan have been prepared and approved in writing by the
Planning Authority and Transport Scotland as the trunk roads Authority. The Plan shall
include details of:
a. Approved access routes,
Page 42

Page 43

 All HGV construction traffic to use the Cross Kintyre Haul Route.
 The B8001 Redhouse - Skipness Road and the B842 Claonaig - Southend
Road must not be used by HGV's. 
 The B8001 Redhouse - Skipness Road and the B842 Claonaig - Southend
Road may be used by LGV related to these works
b. Agreed operational practises (including avoidance of convoy movements,
specifying conduct in use of passing places, identification of turning areas,
information of wheel cleansing facilities, signage to be installed on the A83
warning of construction traffic, signage or temporary traffic control measures
to include for larger or abnormal loads, reporting of verge damage); 
c. The provision of an appropriate Code of Practice to drivers of construction
and delivery vehicles. 
d. Abnormal load route surveys and finalised plan (including any
accommodation measures required including the removal of street furniture,
junction widening, traffic management).  
The development shall be implemented in accordance with the duly approved Traffic
Management Plan  
Reason: To minimise the interference with the safety and free flow of traffic on the
trunk road and to ensure that the transportation of abnormal loads will not have any
detrimental effect on the trunk or local road network.  
4. No development or ground breaking works shall commence until a programme of
archaeological works in accordance with a written scheme of investigation, has been
submitted to and approved in writing by the Planning Authority in consultation with the
West of Scotland Archaeology Service. The scheme shall be prepared by a suitably
qualified person and shall provide for the recording, recovery and reporting of items of
interest or finds within the application site. Thereafter the development shall be
implemented in accordance with the duly approved details with the suitably qualified
person being afforded access at all reasonable times during ground disturbance
works. 
Reason: In order to protect archaeological resources  
5. No development shall commence, until a strategy for housing incoming construction
workers shall be submitted to and approved in writing by the Planning Authority.
Thereafter the development shall be carried out in accordance with the approved
details. 
Reason: In order to ensure that any potential adverse impacts on the functioning of
the local housing market and tourist accommodation to the detriment of the interests
Page 43

Page 44

of the local community are identified and mitigated in accordance with the
requirements of NPF4, and in particular Policy 11C and Policy 25 Objectives. 
6. No development shall commence until an appraisal of the wholesomeness and
sufficiency of the intended private water supply and the system required to serve the
development has been submitted to and approved by the Planning Authority. 
The appraisal shall be carried out by a qualified hydrologist/ hydrogeologist or other
suitably competent person and shall include a risk assessment having regard to the
requirements of Schedule 4 of the Private Water Supplies (Scotland) Regulations 2006
or Part 3 of the Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 (as appropriate) which shall inform the design of the system by
which a wholesome and sufficient water supply shall be provided and maintained. The
appraisal shall also demonstrate that the wholesomeness and sufficiency of any other
supply in the vicinity of the development, or any other person utilising the same source
or supply, shall not be compromised by the proposed development. 
The development shall not be brought into use or occupied until the required water
supply system has been installed in accordance with the agreed specification and is
operational. 
Reason: In the interests of public health and in order to ensure that an adequate
private water supply in terms of both wholesomeness and sufficiency can be provided
to meet the requirements of the proposed development and without compromising the
interests of other users of the same or nearby private water supplies.  
7. No development shall commence until a detailed peat management and reinstatement
plan has been submitted to and approved by the Planning Authority in consultation
with SEPA. 
This shall be submitted to the planning authority and SEPA no later than two months
prior to the intended commencement of development date and include details of :               
 The written consent of  all  landowners whose land is to be utilised 
 Methodology and volume of extraction, 
 Phasing/timing of any works impacting peat
 Quality/classification of Peat to be extracted
 Details of any onsite peat re-instatement and /or enhancement 
 Details of storage and transportation
 Details of the location, area and condition of onsite or offsite peatland to be 
improved 
 Details of peat enhancement measures on this land 
 Details of peatland restoration outcomes to be achieved
Page 44

Page 45

 Details of ongoing management arrangements of the restored peatland
The restored peatland shall thereafter be maintained in accordance with the terms of
the approved peatland management plan, and retained in perpetuity unless with the
written agreement of the Planning Authority in consultation with SEPA. The restored
area shall not be subject to any works or operations in the future to undermine the
objectives of the restoration objectives contained in the approved Peat Management
Plan.
The peat improvement works shall also be undertaken in accordance with the
objectives of the necessary habitat and management plan set out at condition 08
below.
Reason: In order to minimise disturbance of peat and ensure the appropriate
reinstatement, reuse and management of peat in accordance with NPF 4 Policy 5 (c)
objectives.
8. No works to excavate any peat on the site shall be undertaken until a Habitat
Management and Enhancement Plan has been submitted to and approved by the
Planning Authority in consultation with its biodiversity advisor.  
Reason: To ensure that works result in habitat enhancement works being undertaken
in accordance with NPF 4 and LDP Objectives. 
9 No development shall commence until a detailed Compensatory Planting Plan (CPP)
and Long Term Forestry Management Plan (LTFMP) are submitted to and approved
in writing by the Planning Authority, in consultation with Scottish Forestry. The
approved CPP and LTFMP shall be implemented in full and in accordance with the
approved timing, unless otherwise agreed in writing by the Planning Authority. 
Reason: To enable appropriate woodland removal to proceed, without incurring a net
loss in woodland related public benefit, in accordance with the Scottish Government's
policy on the Control of Woodland Removal.  
10. No development shall commence, until a revised Landscape Planting Plan and
Maintenance Plan in accordance with BS EN ISO 11091:1999 has been submitted to
and approved in writing by the Planning Authority. The revised plans must include:
a. A plan showing numbers and locations of each tree and shrub species;
b. Planting schedule to show for each species, the total number, type and size
at planting;
c. Specification for planting to include ground preparation, planting operations
and protection from herbivores;
d. Compensatory planting scheme for tree loss
e. Schedule of implementation and phasing;  
The approved Landscape Planting Plan and Maintenance Plan shall thereafter be
implemented in full in accordance with the implementation schedule and maintained
Page 45

Page 46

in accordance with the approved details. Any plant losses within the first five years will
be replaced at the next planting season.  
Reason: To ensure the development conserves and enhances the landscape
character and biodiversity interests of the area.  
11. Any watercourse crossings, hereby permitted, shall be designed to at least the
capacity of the existing channel and to the 1 in 200 year plus climate change flow and
an allowance for freeboard, unless otherwise agreed in writing by the Planning
Authority.    
Reason: To ensure that new watercourse crossings do not affect the existing flows in
the interests of flood risk.  
12. No external lighting shall be installed on the site other than with the prior written
approval of the planning authority. In that event the location, type and luminance of
the lighting units to be installed shall be specified, and any duly approved lighting shall
be installed in a manner which minimises illumination and glare outwith the boundary
of the application site. The completed site shall not be illuminated other than in the
event of staff being present on site.  
Reason: In order to avoid unnecessary visual intrusion in the interests of the visual
amenity of an area otherwise unaffected by the presence of light sources.  
13. No development shall take place outside the following hours:  
07.00hrs and 19.00hrs Mon to Friday (inclusive)
07.00hrs and 18.00hrs Saturday
No construction works shall take place on Sundays or Scottish Bank Holidays  
unless as otherwise may be agreed in writing with Environmental Protection Officers
in advance of the operations  
Non-construction work and switching works can be carried out on Sundays and
Scottish Bank Holidays between the hours of 08.00 and 13.00.  
Page 46

Page 47

Reason: Reason: To minimise the impact of noise, generated by construction
activities, on occupiers of residential properties. 
Page 47

Page 48

This page is intentionally left blank

Page 49

Argyll and Bute Council
Development and Economic Growth   
Delegated or Committee Planning Application Report and Report of Handling as
required by Schedule 2 of the Town and Country Planning (Development Management
Procedure) (Scotland) Regulations 2013 relative to applications for Planning
Permission or Planning Permission in Principle
_________________________________________________________________________ 
Reference No: 22/02523/PP    
Planning Hierarchy: Local 
Applicant: Mr D. Higgins   
Proposal: Erection of dwellinghouse, formation of vehicular access and associated work 
Site Address: Garden Ground of Torwood House, Torwoodhill Road, Rhu, Helensburgh 
________________________________________________________________________
SUPPLEMENTARY REPORT NO. 1
1.0 INTRODUCTION
The purpose of this report is to advise Members that:
1) The applicant has requested that determination of this application be deferred to allow
an opportunity for him to engage in discussions to Council Officers and to prepare further
details of a scheme of commensurate off-site road improvements for assessment by Planning
Officers in consultation with Area Roads Engineers.
2) To advise Members of the implications of LDP2 as recommended by the Examination
Report.
3) To advise members of further representations received from one of the original
objectors in response to the submission of a revised site plan – proposed drawing no. 
807(L)002 Revision A, received on 21st February 2023. 
2.0 REQUEST FOR DEFERRAL
Members will be aware from the Main Report, that Council officers have assessed the proposal
as being acceptable with reference to all material considerations with the exception of impact
upon highways issues, having particular regard to the consultation response from the
Council’s Area Roads Engineer and third party representations.
It is also noted that the most recent formal consultation response from Area Roads
recommends deferral of determination pending the submission of details of commensurate
off-site improvements to the public approach road, commensurate to accommodate the
intensification of traffic movements resulting from the proposed development. These
commensurate improvements comprise the provision of two passing places on Torwoodhill
Road between the proposed site access and the junction with Upper Torwoodhill Road.
Officers published the Main Report on the basis of information available at the time of the
publication deadline in order to give the applicant a determination as soon as possible. During
the drafting of the Main Report, Officers were engaged in negotiations with the applicant with
Page 49 Agenda Item 10

Page 50

regard to the commensurate improvements. However, the timescale from the start of
negotiations relative to the deadline for the publication of the report gave a very short window
of opportunity to conclude the negotiations to an extent to allow a recommendation for
approval prior to the report publication deadline. At the time of publication of the Main Report,
the recommendation was that the application be refused on grounds that the applicant had
failed to demonstrate that the required commensurate improvements could be implemented,
and as such Officers considered that a recommendation for approval subject to a planning
condition requiring implementation of the improvements would not be competent.
However, on 13th June, the applicant confirmed that the applicant:
“can provide the passing spaces in his land as he owns Torward House which is next to
the proposed site - and the spaces can be formed within his land ownership.”
On the basis of this commitment in principle, Officer’s would support the request for deferral
in order to give the applicant the reasonable opportunity to seek to agree a detailed design for
road improvements, particularly since the time available for the applicant to explore this
opportunity was significantly constrained by the deadline for reports for the June PPSL
meeting. In addition, Officers consider that the roads issue is the only one that warrants a
recommendation for refusal, and that if this issue is reasonably capable of satisfactory
resolution, then the most reasonable way to proceed would be defer formal determination to
give the applicant a reasonable timescale to prepare details of a scheme of road
improvements and to enter into further dialogue with planning officers in consultation with the
Area Roads Engineer.
The application can be reported to PPSL at the next available opportunity upon resolution of
this issue at which time the assessment will be based on a more categorical assessment of
whether the required improvements can be implemented to the satisfaction of Area Roads. 
3.0 RELEVANT PLDP2 POLICIES
Policy 01 - Settlement Areas
Policy 04 – Sustainable Development
Policy 05 – Design and Placemaking 
Policy 06 – Green Infrastructure 
Policy 08 – Sustainable Siting 
Policy 09 – Sustainable Design 
Policy 10 – Design – All Development 
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic Built
Environment
Policy 16 – Listed Buildings 
Policy 17 – Conservation Areas 
Policy 34 – Electric Vehicle Charging
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes
Policy 36 – New Private Accesses 
Policy 40 – Vehicle Parking Provision 
Page 50

Page 51

Policy 41 – Off Site Highway Improvements 
Policy 61 – Sustainable Drainage Systems (SUDS) 
Policy 66 – New Residential Development on Non-Allocated Housing Sites within Settlement
Areas
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development
Impact on Sites of International and National Importance.
Policy 77 – Forestry, Woodland and Trees 
Policy 79 – Protection of Soil and Peat Resources 
4.0 IMPLICATIONS OF PLDP 2 AS RECOMMENDED TO BE MODIFIED BY THE
EXAMINATION REPORT
The assessment of this proposal against PLDP2 as recommended to be modified by the
Examination Report is as follows:
Policy 01 – Settlement Areas: The proposal is located within the Settlement Area for Rhu as
identified in PDLP2. The provisions of Policy 01 continues to set out general support for
development within the settlement area. No substantive change to previous assessment. 
Policy 04 – Sustainable Development: Promotes the principles of sustainable development
and remains generally aligned with the requirements of ABC LDP STRAT 1 and NPF 4 Policies
1 and 2 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 05 – Design and Placemaking: Sets out principles for achieving good quality places and
is generally aligned with the requirements of ABC LDP 2015 Policy LDP 9 and SG LDP
Sustainable Design, and NPF4 Policy 14 which have already been applied to the assessment
of this matter. No substantive change to previous assessment.
Policy 06 – Green infrastructure: Sets out a requirement for the developer to demonstrate how
green infrastructure has been integrated into the design of the proposal from the outset. This
policy overlaps with provisions elsewhere to consider enhancements to biodiversity and
sustainable urban drainage which have already been applied to the assessment of this matter.
No substantive change to previous assessment.
Policy 08 – Sustainable Siting: Sets out the principles for successfully integrating new
development into its landscape/townscape setting and is aligned with the provisions of NPF4
and ABC 2015 Policy LDP 9 and SG LDP Sustainable Design which have already been
applied to the assessment of this matter. No substantive change to previous assessment.
Policy 09 – Sustainable Design: Sets out that development proposals should demonstrate
consideration of and where possible utilisation of renewable sources of energy; and
sustainable design and construction methods. The Supporting Statement accompanying the
application identifies that the proposal has been sited to maximise solar gain and would be
constructed to meets Section 7 Sustainability of Scottish Technical Standards to provide an
energy efficient build, enhanced natural lighting, home office space, energy efficient heating
and improved storage space. No substantive change to previous assessment.
Policy 10 – Design – All Development: Sets out requirements for the design of new
development and is generally aligned with the provisions of NPF4 and ABC 2015 Policy LDP
Page 51

Page 52

9 and SG LDP Sustainable Design which have already been applied to the assessment of this
matter. No substantive change to previous assessment.
Policy 15 – Supporting the Protection, Conservation and Enhancement of Our Historic Built
Environment: Sets out that development will not be supported where it fails to protect,
conserve or enhance the special characteristics and/or cultural significance of the historic built
environment, or to avoid any cumulative effect upon the integrity or special qualities of heritage
assets. Policy 15 is aligned with the aims of NPF4 Policy 7 and ABC LDP 2015 Policy LDP 3
which have already been applied to the assessment of this matter. No substantive change to
previous assessment.
Policy 16 – Listed Buildings: Sets out requirements for development which affects a listed
building or its wider setting. The aims of Policy 16 are aligned with the aims of NPF4 Policy 7
and ABC LDP 2015 Policy LDP 3 which have already been applied to the assessment of this
matter. No substantive change to previous assessment.
Policy 17 – Conservation Areas: Sets out a requirement that new development will preserve
or enhance the character and appearance of a conservation area. The aims of Policy 17 are
aligned with the aims of NPF4 Policy 7 and ABC LDP 2015 Policy LDP 3 which have already
been applied to the assessment of this matter. No substantive change to previous
assessment.
Policy 34 – Electric Vehicle Charging: This policy sets out a requirement for all new residential
development with private off street parking to install dedicated cable ducting connecting each
private residential parking space to the nearest electricity supply connection point capable of
supporting the installation of a 7-kilowatt EV charging point. The provisions of Policy 34
introduce an additional requirement for residential development that has not been included
within the design of the current proposal or the previous assessment. In the event that it were
proposed to grant planning permission then it would be appropriate to seek the submission of
further information to ascertain the practicability of this requirement in relation to the current
development, and if deliverable and considered appropriate, to impose a planning condition
to secure the provision of EV cable ducting within the implementation of the development.
Policy 35 – Design of New and Existing, Public Roads and Private Access Regimes: Sets out
that the acceptance of development utilising existing public roads is subject to road safety and
street design issues being addressed to the satisfaction of the Roads Authority and Planning
Authority. In this instance it has been identified by the Roads Authority that the existing public
road serving the development is substandard and unsuited to accommodate additional
development without improvement; a detailed assessment is set out in the main report of
handling of this aspect in relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and
SG LDP TRAN 5. On the basis that the applicant has not demonstrated that they would be
able to address the underlying issues relating to street design and road safety the proposal
would be viewed as contrary to the provisions of Policy 35. No substantive change to previous
assessment.
Policy 36 – New Private Access: Sets out the circumstances where a new private access may
be considered to be acceptable. In this instance the proposal would connect to the public road
by a private driveway connection and would be consistent with the principles of Policy 36a.
No substantive change to previous assessment.
Policy 40 – Vehicle Parking Provision: Sets out standards for off street car and vehicle parking.
The proposed provision of 3 onsite parking spaces would be consistent with the requirements
of Policy 40. No substantive change to previous assessment.
Policy 41 – Offsite Highway Improvements: Sets out an expectation that where new
development would be served by a substandard private or public approach road then it will
contribute proportionately to improvements to an agreed section of the public or private road
Page 52

Page 53

network. A detailed assessment is set out in the main report of handling of this aspect in
relation to ABC LDP 2015 Policy LDP 11 and SG LDP TRAN 4 and SG LDP TRAN 5. No
substantive change to previous assessment.
Policy 61 – Sustainable Urban Drainage Systems: Sets out a requirement that proposal for
SuDS are required in relation to all development prior to determination. The proposal has been
amended to include detail that SuDS are to be designed and installed in accordance to BRE
Digest 365 Soakaway Design and BSEN - 752-4. No substantive change to previous
assessment.
Policy 66 – New Residential Development on Non-Allocated Housing Sites within Settlement
Areas: Sets out criteria to be applied to new residential development on non-allocated sites
which seeks to secure an appropriate relationship with existing properties, respect the
character of the locale, and to ensure that appropriate standards of access and parking are
secured. The provisions of Policy 66 are aligned with the provisions of NPF 4 Policy 14, and
elements of ABC LDP 2015 Policy LDP 9 and SG LDP Sustainable Design, Policy LDP 11
and SG LDP TRAN 4 and SG LDP TRAN 6 which are all covered within the previous
assessment. No substantive change to previous assessment.
Policy 73 – Development Impact on Habitats, Species and Biodiversity.  Development Impact
on Sites of International and National Importance. The provisions of Policy 73 are generally
aligned with the requirements of NPF4 Policy 3, and ABC LDP 2015 Policy LDP 3 and Sg LDP
ENV 1 which have already been applied to the assessment of this matter. No substantive
change to previous assessment.
Policy 77 – Forestry, Woodland and Trees: Sets out criteria for the assessment of
development impact on woodland and trees. The provisions of Policy 77 are aligned with the
requirements of NPF4 Policy 6; ABC LDP 2015 Policy LDP 3, and SG LDP ENV 6 which have
already been applied to the assessment of this matter. No substantive change to previous
assessment.
Policy 79 – Protection of Soil and Peat Resources: Sets out that the Council will only support
development where appropriate measures are taken to maintain soil resources and functions
through measures that are proportionate to the development. Policy 79 is aligned with the
provisions of NPF4 Policy 5 which have already been applied to the assessment of this matter.
No substantive change to previous assessment. 
6.0 ADDITIONAL REPRESENTATIONS
Since publication of the Report, an amended representation has been received from:
 Albert Barclay - Carbeth House, Torwoodhill Road, Rhu
Representations are published in full on the planning application file and are available to view
via the Public Access section of the Council’s website, and a summary of the issues raised
are summarised as follows:
 The further information provided by the revised Drwg 807(L)002A is a substantive
amendment to the application and additional information should be provided by the
applicant to demonstrate that the proposed soakaway solution is fit for purpose. 
 The underlying strata of the site is rock, so it is questionable how the principle of
soakaways (proprietary or otherwise) would actually work effectively. 
Page 53

Page 54

 The implications will be far reaching in terms of flood risk to adjacent infrastructure and will
not be easily rectified if a wrong assessment is made. 
 A detailed Drainage Survey should be required for approval by the relevant authorities as
a condition of planning approval, particularly given the revised proposals. 
 Additional particulars and detailed information should be required for proper consideration
prior to approval by committee. 
Comment: - With respect to the objector, the latest representation offer some clarity on the
issue of surface water/land drainage in respect of the revised drawings, however it does
not raise any new material planning issues over and above those set out, and fully
assessed in the Main Report. The revised representation does not raise any new issues
that requires an amendment to the Main Report. 
 The revised drawing does not address waste and soil water discharge. This matter also
needs to be fully addressed. 
Comment: - The application details propose that foul water drainage be by means of a
connection to the public drainage network. The consultation response from Scottish Water
does not indicate that there are any constraints that would warrant further information from
the applicant in this respect. Land water drainage should be assessed as part of the
proposed private surface water drainage system. No changes to the main Report are
required in response to this issue. 
7.0 CONCLUSION
Request for Deferral
Having regard to all material considerations, including the planning history of a planning
permission for a similar development on this site in 2017; the consultation response from Area
Roads on the current application; and the acceptance of the applicant in principle to implement
off-site road improvements to provide two passing places on the public approach road; and
given that Officers are otherwise minded to support this proposal, it considered wholly
appropriate in these circumstances to allow the applicant every reasonable opportunity to
seek, with Council Officers, to continue to seek a resolution that accords with the consultation
response from Area Roads and with relevant transport/access policy.
However, should Members wish to determine the application on the basis of the information
available at the time of publication of the Report, then the following matters should be noted.  
LDP2 Assessment
Proposed Local Development Plan 2 as recommended to be modified by the Examination
Report is now a significant material consideration. However, in this case there is no significant
material change of policy between the Adopted Plan and Proposed Local Development Plan
2 as recommended to be modified by the Examination Report that would require further
assessment or lead to a change in the recommendation.
Further Representations
Page 54

Page 55

Whilst the latest representation received provides some clarity to the original objection in
response to the submission of a revised site plan drawing showing soakaway drainage, with
respect to the objector, it does not raise any new issues that have not been assessed within
the body of the Main Report. For Members convenience, should planning permission
ultimately be approved, then it is recommended by officers that it be subject to a suspensive
planning condition requiring the submission and approval of further drainage details for
assessment by officers in consultation with the Council’s Flood Risk Assessor. 
6.0 RECOMMENDATION 
1) That Members defer determination of this application to allow an opportunity for the
applicant to prepare and submit further details to demonstrate to the satisfaction of Council
Officers that there are no constraints to the implementation of an agreed scheme of
commensurate off-site road improvements.
Should Members wish to determine the application at the meeting on 21st June 2023,
notwithstanding the Officer’s recommendation above, then the secondary recommendation is
that: 
2) Members note the additional representation received: and, 
3) Determine the application in accordance with the Head of Development & Economic
Growth’s report dated 13th June 2023. 
Author of Report: N. Shewan  Date: 20.06.2023
Reviewing Officer:  Sandra Davies Date: 20.06.2023 
Fergus Murray 
Head of Development and Economic Growth 
Page 55

Page 56