Page 1

Renewable and Low
Carbon Energy
Planning Guidance
Consultation Draft
2025  
Appendix 1

Page 2

Contents
1. Introduction .............................................................................. 1
1.1 Background ...................................................................... 1
1.2 Addressing NPF4 and LDP2 Policy Criteria ......................... 1
1.3 Preparing Submissions ..................................................... 1
1.4 Submitting Applications .................................................... 3
2 Renewable, Low Carbon and Zero Emissions Technologies ......... 4
2.1 Wind ................................................................................ 4
2.2 Hydropower...................................................................... 4
2.3 Enabling works including grid infrastructure ....................... 5
2.4 Energy storage .................................................................. 5
2.5 Solar Arrays ...................................................................... 5
2.6 Bioenergy ......................................................................... 6
2.7 Negative emissions technologies and carbon capture ........ 6
2.8 Co-location ...................................................................... 7
3 Planning Considerations ........................................................... 7
3.1 Socio-Economic Impacts .................................................. 7
3.2 International and National Designations ............................ 8
3.3 Impacts on Communities and Individual Dwellings ............ 8
3.4 Landscape and Visual Impacts ....................................... 10
3.5 Public Access, Recreation and Scenic Routes .................. 21
3.6 Aviation and Defence Interests ....................................... 21
3.7 Telecommunications and Broadcasting Installations ....... 22
3.8 Roads and Transport ...................................................... 22
3.9 Historic Environment ...................................................... 23
3.10 Hydrology, Water Environment and Flood Risk ................. 24
3.11 Biodiversity .................................................................... 26
3.12 Trees, Woods and Forests ............................................... 32
3.13 Hazardous Installations .................................................. 33
3.14 Construction Impacts .................................................... 34
3.15 Soils .............................................................................. 34
3.16 Cross Boundary Applications .......................................... 37
3.17 Decommissioning & Restoration ..................................... 38
3.18 Renewable Energy Generation and Greenhouse Gas
Emissions Reduction Targets .......................................... 39
3.19 Grid Capacity ................................................................. 40
3.20 Cumulative Impacts ....................................................... 40
3.21 Permission Lifetime and Extensions ................................ 41
4 Appendices ............................................................................ 43
4.1 NPF4 and [LDP2] Policies ............................................... 43
4.2 Construction Method Statement Template ...................... 45

Page 3

Renewable and Low Carbon Energy Guidance          1 
1. Introduction
1.1 Background
This document sets out the key considerations in the Development Plan for
renewable energy applications. The Development Plan includes National
Planning Framework (NPF4) and Perth & Kinross Local Development Plan
2019 (LDP2). All policies in NPF4 apply. Policies in LDP2 apply where they
are not incompatible with NPF4. This includes parts of Policy 33:
Renewable and Low Carbon Energy as set out in Appendix 1. 
NPF4 Policy 11: Energy is strongly supportive of renewable and low carbon
energy technologies, recognising – alongside other key NPF4 policies – the
need to address the climate crisis through supporting the move to net zero.
Significant upscaling in renewable energy technologies and infrastructure
is needed to meet renewable energy generation and greenhouse gas
emissions reduction targets. 
Guidance is provided here on policy interpretation, how impacts are
expected to be avoided and minimised, and the information that is to be
submitted with planning applications.  The Guidance will be a material
consideration in the determination of planning applications and will help
inform any Perth & Kinross Council (PKC) consultations on Energy Consent
Unit (ECU) applications.
1.2 Addressing NPF4 and LDP2 Policy Criteria
The Guidance provides information in relation to each of the criteria in
NPF4 Policy 11. Relevant additional criteria contained in LDP Policy 33 are
also included for consideration and are set out in Appendix 1. Other
relevant NPF4 and LDP2 policies and associated guidance are referenced
and should be addressed in submissions as relevant. 
Each policy section in this guidance contains:
• information relevant to all technologies
• additional advice specific to each technology.
Applicants should apply both the general and technology specific advice.
Proposals must address NPF4 and LDP2 as a whole and all relevant
policies. The applicability of policies and guidance will be relative to the
scale, location and nature of the proposal.
Spatial Guidance
NPF4 Policy 11(b) reaffirms that wind farms will not be acceptable in
National Parks and National Scenic Areas. LDP2 Policy 33D: Spatial
Framework for Wind and the associated map no longer apply. 
1.3 Preparing Submissions
Applicants should refer to the Council’s website for information on the
application process, fees and submission requirements including
application checklists. A pre-application enquiry is strongly advised to help
ensure appropriate and proportionate information. 
Information on existing renewable installations is available on the
Renewable energy proposals map
Small scale renewable energy generation technology
Small scale renewable generation can provide clean energy for individual
homes, businesses, and community-scale projects. Examples include
ground and air source heat pumps, roof-mounted solar, domestic/small
scale wind. Small scale schemes should consider key impacts on amenity,
air quality, landscape and visual impact, and if there are any particular
sensitivities or designations within the site/surrounding area including
birds, protected species, protected areas, and heritage interests. 
Micro-renewables with an output less than 50kW electricity or 45kW
thermal within the curtilage of a dwelling may be covered by permitted
development rights (with limits and conditions), but proposals in a
conservation area or where heritage assets are affected will need planning
permission and/or listed building consent.

Page 4

Renewable and Low Carbon Energy Guidance          2 
• Circular 1/2024 (Domestic)
• Circular 2/2024 (Non Domestic)
• Renewable | Scottish Environment Protection Agency (SEPA)
• Micro-renewables | NatureScot
• Managing Change in the Historic Environment: Micro-renewables |
HES
• What work needs a building warrant? | PKC
Major Applications
Major developments are subject to additional requirements including Pre-
Application Consultation with relevant communities and affected parties.
Major applications include all developments in Schedule 1 of the EIA
(Scotland) Regulations 2017, and all electricity generating developments
over 20MW, or extensions resulting in a development over 20MW.
• Major Planning Applications (PKC)
EIA Developments
Environmental Impact Assessment (EIA) is a process which identifies and
helps address significant environmental effects. Applicants are strongly
encouraged to request a screening opinion at an early stage to ascertain if
an EIA will be required. 
• EIA Guidance (PKC) 
• EIA Guidance (Scottish Government)
• Circular 1/2017 EIA Regulations (Scottish Government)
• EIA Guidance | NatureScot
• EIA Guidance | Historic Environment Scotland
National Development
Strategic Renewable Electricity Generation and Transmission Infrastructure
is identified as National Development. This includes: 
• Electricity generation and storage from renewables exceeding 50MW
capacity
• Electricity transmission lines, cables and interconnectors of 132kv or
more
• Infrastructure supporting high voltage lines, cables and
interconnectors including substations
Pumped storage hydro infrastructure that would otherwise be a major
application is identified as National Development.
Applications for national developments and network projects are made to
the Scottish Government Energy Consents Unit. This guidance is relevant
as Perth & Kinross Council is a statutory consultee for Energy Consent
applications within Perth & Kinross.
• Energy Infrastructure |Scottish Government
• Energy Consents Guidance | Scottish Government
• Energy Consents Unit Website | Scottish Government
• Applications to the Scottish Ministers under s37 of the Electricity
Act 1989 without an EIA Report
• Standard Onshore Wind Conditions (S36) | Scottish Government
Applicants to the ECU are encouraged to engage with PKC as consultee at
an early stage. Where necessary PKC will submit a tracked changes version
of the standard conditions for Wind to Scottish Ministers with
recommended and justified amended or additional conditions to ensure
proposals accord with the Development Plan. New requirements for
consultation may be introduced during the lifetime of this guidance.
Additional Requirements
Further permissions including building warrants, listed building consents
or environmental licences are additional to planning permissions.
Information to inform a Habitat Regulations Appraisal may be required for
any application that may affect a European Site.

Page 5

Renewable and Low Carbon Energy Guidance          3 
1.4  Submitting Applications
Submissions should address:
• The written advice in this Guidance
• The policies in NPF4
• The policies in LDP2 and associated guidance where relevant.
• The additional relevant assessments and surveys indicated
throughout the Guidance.
• Relevant information from assessments or licence applications
required by external bodies 
All submissions should provide:
• Capacity of renewable energy in kW / MW for all generation,
transmission, distribution and storage proposals
• Number, design, specifications and description of renewable energy
technology and expected operational lifespan
• Site photos and/or visual representation of the installation
• Red line of the site including all areas of the development
Submissions for applications except micro-renewables should provide a
plan of the site, and surrounding area showing where relevant:
• Proposed permanent and temporary infrastructure including all
plant and buildings, cable and pipeline routes, tracks, compounds,
excavations and abstractions.
• Grid connection location and route; or route of heat network
• Nearest receptors including buildings, dwellings, roads, and
recreation areas and routes
• Onsite, adjacent and connected environmental sensitivities
including: watercourses; waterbodies; water supplies and
abstractions; peatland, carbon rich soils, habitats; trees, woodlands
and natural heritage designations; and historic environment assets.

Page 6

Renewable and Low Carbon Energy Guidance          4 
2 Renewable, Low Carbon and Zero
Emissions Technologies
2.1 Wind
Wind plays a significant role in the renewable energy mix with potential
contributions to producing clean energy through the siting of the right
turbines in the right place including new sites, and repowering/extending
existing sites. Height of turbines is measured by height to blade tip (hbt) or
to hub.
An EIA may be required for any turbine over 15m (hub height), more than
two turbines of any height, or in a sensitive area.
There are a range of different wind power proposals in terms of scale:
• Fixed micro turbines: fixed on buildings. These are building-level
solutions and may not be efficient, or suitable, in all locations.
Limited permitted development available for detached
dwellinghouses. 
• Free standing micro turbines: up to 15m hbt and <50kW are suitable
for rural domestic/agricultural use and are potentially covered by
permitted development rights (PDR) for domestic use. PDR is limited
and subject to prior notification and approval.
• Small turbines: 15m-30m hbt will require planning permission if over
50kW or not covered by PDR. Foundations and underground cabling
may be required.
• Medium turbines: 30m-50m hbt can have significant impacts if
poorly sited and will require planning permission.
• Large turbines: >50m hbt. Large turbines require deep foundations,
turbine delivery, crane pad construction and electricity
infrastructure including transformers. Individual turbines can be
sized 200+m in height with larger blades and a greater energy
generation capability and will require planning permission 
1 Reservoir (Scotland) Act 2011 reduced this to 10,000m3 but is not yet in force
• Wind farms: 3 or more turbines over 30m. Greater land take and
infrastructure including substations and grid connections. Wind
farms can vary in scale from a small number of turbines to
proposals for a large array and will require planning permission. 
• Renewable | Scottish Environment Protection Agency (SEPA)
• Onshore wind energy | NatureScot
• Historic Environment Policy for Scotland | Historic Environment
Scotland
• Circular 1/2024 Permitted Development Rights (Domestic)
• Circular 2/2024 Permitted Development Rights (Non Domestic)
• Standard Onshore Wind Conditions (S36) | Scottish Government
2.2 Hydropower
Hydropower has a high level of efficiency and predictability and even small-
scale hydropower can provide a reliable source of electricity to support
rural communities and business.
All Hydropower installations require planning permission and include:
• Impoundment: a dam holding back a large head of water allowing
water flow, and energy production, to be regulated. Impoundment
with capacity >25000m3 will need to be registered with SEPA as a
reservoir.1 
• Pumped Storage Hydroelectric (PSH): where water can be pumped
back up to an impoundment dam for energy storage. These can be
on an open waterbody or in closed artificial storage ponds.
• Run of River: a proportion of water flow is diverted via a weir to pass
through a penstock to a powerhouse and discharged back into the
watercourse. The components of an installation will vary depending
on location and vertical drop (head) and may require penstocks,
lades, weirs, and water drawn from multiple sources.
Note that proposals for PSH dams or associated infrastructure that would
otherwise be considered major applications are national development.

Page 7

Renewable and Low Carbon Energy Guidance          5 
An EIA may be required depending on the scale/location of the proposal,
including in sensitive areas. All National Development applications will
require an EIA (see Section 1.3 Preparing Submissions).
A water use (CAR) licence under the Water Environment (Controlled
Activities) Regulations 2011 will be required for all applications. This may
include impoundment and abstraction licences. Engineering works
including where penstock routes or tracks cross water courses will also
require SEPA authorisation. Applicants should contact SEPA at an early
stage to discuss requirements, check whether the scheme is licensable,
and progress both applications concurrently. Proposals will need to meet
SEPA criteria to be provisionally acceptable to SEPA.
• Hydropower | SEPA
• Hydroelectric power | NatureScot
• Historic Environment Policy for Scotland | Historic Environment
Scotland
2.3 Enabling works including grid infrastructure
To facilitate new or extended generation capacity enabling works may also
be required. This includes grid infrastructure such as transmission and/or
distribution network upgrades. For the Perth and Kinross Council area,
SSEN are both the transmission and distribution network operators.
PKC will be consulted or notified on new transmission or distribution
infrastructure and ECU applications are expected to demonstrate
compliance with NPF4 and LDP2 policies and this guidance document. 
Grid infrastructure works may involve new and/or upgraded infrastructure
including overhead and underground cables, overhead lines on wooden
poles or steel towers, and electricity substations. There are currently
several SSEN transmission upgrade ‘pathway to 2030’ projects within the
PKC area. 
Connections to the grid may have adverse impacts such as habitat loss
and fragmentation, impacts on the water environment, bird collision risk
and significant visual impacts. NPF4 Policy 11e highlights that in the case
of proposals for grid infrastructure, consideration should be given to
underground connections where possible. This is subject to consideration
of impacts on archaeology and the natural environment.
NPF Policy 11(e) states that grid capacity will not constrain applications for
renewable energy, however applicants connecting to the grid should
discuss connection with the relevant network operator at an early stage.
To enable the full implications of applications to be understood applicants
should indicate the route and location of infrastructure to be used to
connect to the grid within the site, including transformers, substations and
associated fencing and access. The Council will need to agree the
connection point and method of connecting to the grid before
commencement. For section 37 applications provision of the above
information will inform the Council’s consultation response.
2.4 Energy storage
Energy storage enables energy generated from renewable sources to be
stored and released when most needed. Energy storage can maximise
efficiency of intermittent technologies such as wind and solar. Examples
can include battery storage, pumped storage hydro and hydrogen
generation from renewable energy.
Large-scale battery energy storage systems (BESS) are being used to
balance energy demand and supply across the UK energy network either as
stand alone or in association with solar or wind installations. For the
purposes of National Planning Policy, battery storage is considered to be
generation. Battery Storage guidance is in preparation by Scottish
Government. 
Storage proposals co-located with other renewable technologies are
supported as they improve efficiency and reduce energy loss. 
Battery Energy Storage Systems | SEPA
2.5 Solar Arrays
Electricity from solar photovoltaic panels (Solar PV) or hot water from solar
heat collectors (Solar Thermal) provide or supplement energy needs with

Page 8

Renewable and Low Carbon Energy Guidance          6 
low visual and environmental impacts and can utilise unused or underused
roof-space or land. 
Solar Thermal: usually roof mounted, utilises heat from the sun through a
heat exchanger to supplement hot water or central heating.
Solar PV: produces electricity from photovoltaic panels and is useful for
supporting domestic use, supporting or supplementing other low carbon
technologies such heat pumps, and providing energy to the grid. Forms
include:
• Roof mounted PV: solar panels, PV roof tiles, flexible panels, and
wall mounted PV. Permitted development rights exist for domestic
and non-domestic microgeneration
• Ground mounted PV: range from domestic scale to large solar farms
and involve PV panels, mounting structures, fencing, lighting and
CCTV, inverters, cabling, and transformers, and can take up a large
amount of land.
o Microgeneration <50kW arrays are useful for domestic or
agricultural use with limited infrastructure. Limited PDR are
possible for these schemes.
o Solar Farms >50kW will require planning permission and can
have a greater impact from land take and use of infrastructure
including transformers, inverters and fencing.
o Large scale solar farms over 0.5ha or in a sensitive area may
require an EIA.
Key information for solar arrays:
• Renewable | Scottish Environment Protection Agency (SEPA)
• Solar energy | NatureScot
• Managing Change in the Historic Environment: Micro-renewables |
HES
2.6 Bioenergy
Bioenergy refers to the burning of organic matter (biomass) or breakdown of
organic matter (anaerobic digestion - AD) to produce heat and energy. The
most efficient use of bioenergy is to provide combined heat and power
(CHP) for industrial or heat network use. AD can also produce synthetic gas
for use in CHP or transport. Where demonstrated to be low carbon or zero
emission or bioenergy “associated with negative emissions technology”
(BECCS) such proposals are supported by NPF4 Policy 11. Bioenergy
proposals must therefore comply with strict land and greenhouse gas
criteria to be considered low carbon including harvesting, processing,
storage and transport emissions of feedstock and the use of carbon capture
technology where possible. 
To protect soils and woodland and to maximise GHG savings, bioenergy
proposals must source UK feedstocks only from:
• Primary waste sources such as brash, manure
• FSC sustainable certified products 
• Short rotation coppice or energy crops on:
o  class 4.1 – 6.01 land on the land capability for agriculture
1:50,000 maps
o Class 0 mineral soils on the Carbon and Peatland Map; or
• Short rotation forestry in accordance with the Forest & Woodland
Strategy 
• Bioenergy Policy Statement (draft) | Scottish Government
2.7 Negative emissions technologies and carbon
capture
NPF4 defines negative emissions technologies (NETs) as “an emerging field
of technologies that remove greenhouse gases from the atmosphere and
utilising carbon capture and storage sequester them permanently.”
Examples of technologies include:
• Carbon capture, utilisation and storage (CCUS) which captures
carbon dioxide generated by large-scale energy intensive processes,
and transports it for permanent storage underground
• Forms of Direct Air Capture with Carbon Storage (DACCS),
• Bioenergy with Carbon Capture and Storage (BECCS), or
• Other more experimental means such as enhanced weathering or
biochar.

Page 9

Renewable and Low Carbon Energy Guidance          7 
2.8 Co-location
Co-location of more than one renewable technology can provide benefits
such as using energy storage to deliver energy to the grid when needed, and
potentially reduce land-take and environmental impacts. Co-location is
supported subject to policy considerations including landscape and land
use compatibility.
LDP2 Policy 33(i) requires all proposals to consider whether onsite energy
storage is suitable for their site. 
All major and EIA proposals should set out the energy storage opportunities
that have been explored and reasons for decisions taken on co-locating
energy storage.
3 Planning Considerations
The following considerations and guidance follow the requirements set out
in NPF4 Policy 11 with additional considerations in LDP2 Policy 33. The list
of considerations and their source are contained in Appendix 4.1.
3.1 Socio-Economic Impacts
Key Policies:
• NPF4 Policy 11(c)
• NPF4 Policy 25: Community Wealth Building
Key Guidance: 
• Big Place Conversation 2023 Results
• Local Place Plan Register
• Community Benefits Toolkit | Local Energy Scotland
• Good practice principles for Community Benefits from Onshore
Renewable Energy Developments (2019) | Scottish Government
• Shared Ownership | Local Energy Scotland
• Community Funds for Transmission Infrastructure | UK Government
• Community Energy Generation Growth Fund | Local Energy Scotland
All proposals
“ Development proposals will only be supported where they maximise
net economic impact, including local and community socio-economic
benefits such as employment, associated business and supply chain
opportunities.„ NPF4 Policy 11(c)
All local proposals should demonstrate a commitment to maximising the
net economic impact addressing the elements in Policy 11(c). 
All major and EIA proposals must provide a statement setting out measures
taken or committed to, which maximise net economic benefit including
local benefits and to the wider Perth and Kinross economy. Scottish
Government guidance is expected to be released during lifetime of this
guidance which should be adhered to.

Page 10

Renewable and Low Carbon Energy Guidance          8 
NPF4 Policy 25: Community wealth building sets out the positive socio-
economic impacts of proposals that will be supported. Discussions with
community bodies and reference to local place plans and/or community
action plans will help inform the development of socio-economic
statements. NPF4 Policy 25 also states that development proposals linked
to community ownership and management of land will be supported.
All large wind and wind farm applications and all hydropower applications
should consider their land use impacts on other commercial users. For
example, wind farms can disrupt airflow on neighbouring wind farms, and
hydropower developments may affect flows for other hydropower,
agricultural or recreational business uses.
Community Ownership and Community Benefits 
Community benefits are voluntary monetary or other benefits unrelated to
the impacts of the project, provided by the developer. These offer
opportunities to support community action plans such as through
discounted supply of free electricity for local use, or share of ownership. 
However, monetary benefits are not material to planning and will not be
taken into account in decisions on planning applications nor will
community ownership justify environmentally damaging proposals.
3.2 International and National Designations
International and National designations relate to National Parks,
landscape, biodiversity and geodiversity designations. National Parks and
landscape issues are addressed in chapter 3.4 on Landscape and Visual
Impacts and biodiversity and geodiversity in chapter 3.11 on Biodiversity
3.3 Impacts on Communities and Individual Dwellings
Key Policies:
• NPF4 Policy 11(e)(i): Energy
• NPF4 Policy 23(d): Health & Safety
• LDP2 Policy 33: Renewable and Low Carbon Energy
• LDP Policy 55: Nuisance from Artificial Light and Light Pollution
• LDP Policy 56: Noise Pollution
• LDP2 Policy 57: Air Quality
Key Guidance
• Guidance Biomass | SEPA
• Supplementary Guidance Air Quality | PKC
• Local air quality management policy guidance | Scottish
Government
• Wind Turbine Noise | Institute of Acoustics
All proposals
NPF4 11(e)(i) requires proposals to demonstrate through project design
and mitigation how impacts on communities and individuals are
considered including residential amenity, visual impact, noise, shadow
flicker. LDP2 Policy 33 also requires air quality to be addressed.
The operation and construction of most proposals can impact on amenity
through dust, odour, lighting, and vibration, and should be addressed in
addition to the main issues below. All Technologies should address the
impacts of noise generating equipment early during site selection and
siting, design and technical controls. Construction should be time-
controlled to limit impacts. 
Noise assessments should address sensitive receptors and demonstrate
that nearby residents’ enjoyment of their dwellings or gardens is not
adversely affected. Receptors in a rural environment may be more sensitive
to noise impacts. Cumulative assessments will be required where
equipment including substations, storage and transformers are located in
close proximity including from existing installations. All noise generated
from equipment should be acoustically insulated where possible and
where there is potential for a significant impact on receptors including
priority species. 
Where construction or security lighting is required, sensitive siting,
shielding and passive infrared technology should be used to minimise
impacts on residents.
Measures should be taken to reduce air borne emissions in construction,
transport and operation including abatement, utilising methane, reducing

Page 11

Renewable and Low Carbon Energy Guidance          9 
transport distances, dust mitigation, using sustainable fuel sources and
adhering to the waste hierarchy. 
Wind
Shadow flicker and strobe effects from moving blades can create
distraction and have potential health effects on some individuals. Shadow
flicker occurs when blades rotate and cast a shadow over neighbouring
properties at certain times of day and year. Impacts should be avoided
primarily through site selection, siting and separation distances, and
design, with residual impacts mitigated through technical controls.
Applicants for large turbines and wind farms should identify dwellings that
may be significantly affected. This includes dwellings within 10 rotor
diameters distance and within 130 degrees either side of North taking into
account turbine height, topography and latitude. Impacts on affected
dwellings should be for no more than 30minutes per day or 30 hours per
year at any dwelling.
Noise impact will depend on distance, turbine design, topography,
prevailing wind direction and speed, and siting. Turbines may also have
temporary impacts from amplitude modulation: a ‘thump’ caused by the
movement of the blades through the air. 
Assessments should also be carried out for construction noise including
blasting for foundations and borrow pits where relevant. 
A Noise Impact Assessment (NIA) for receptors within a 35db contour of
turbines may be required and should be updated following any material
change in the proposed design. The Environmental Health team will help
identify requirements and the appropriate receptors and should be
engaged early in preparing submissions. Submissions for medium turbines
and above should show that noise will not exceed 35dB at noise sensitive
premises (LA90, 10min of 35dB, <=10m/s wind speed, at 10m height) – with
a 5dB penalty for any tonal noise generated. Assessments should be
undertaken in accordance with standard ETSU-R-972 and guidance. 
2 ETSU R 97 is due to be updated during 2025.
Large wind farms and complex cumulative impacts will be considered by
the Council. A cumulative assessment should demonstrate increases in
noise levels are acceptable. These will be required for large turbines, wind
farms, and for small turbines where there are other wind installations
within 2km.
Hydro
Noise may be an issue from powerhouses. Providing the powerhouse
location and manufacturer’s data will allow the Environmental Health team
to advise potential impacts, noise limits and any Noise Impact Assessment
(NIA) requirements. 
Vibration from powerhouse operation may also affect nearby dwellings. The
design, construction and maintenance of powerhouses should ensure
standards are not exceeded (see Table 1 of BS 6472-1:2008).
Solar
Noise may arise from poorly maintained tracking mechanisms and
construction particularly from pile driven foundations, and potential
operational noise from inverters and transformers. Proposals should
ensure nearby dwellings are not adversely affected. An assessment and
mitigation, such as limiting construction times, acoustic housing of
transformers and maintenance plans may be required. 
Glint and Glare is a limited issue with modern PV panels, but submissions
for solar farms should show no adverse impacts on sensitive receptors
including residential dwellings and roads taking into account tracking
movements and seasonal adjustments. Glint and Glare assessments will
be required where properties within 1km to the east and west of the
development have line of sight of the solar panels. Glint and glare can be
mitigated through siting, screening and limiting the angle of panels.
The visual impact of security lighting should also be minimised through
sensitive siting, passive infra-red technology and shielding.

Page 12

Renewable and Low Carbon Energy Guidance          10 
Energy Storage
Noise impact from the operation of battery units including cooling systems,
inverters and transformers will need to be considered, particularly where
these are proposed close to residential properties. Providing the location of
associated infrastructure and manufacturer’s data will allow the
Environmental Health team to advise on potential impacts, noise limits
and any Noise Impact Assessment (NIA) requirements. This will include
cumulative assessments of sites situated near substations, solar farms or
other energy storage sites. A condition to control noise will be applied. 
Sites should avoid impacts on sensitive receptors in the first instance.
Acoustic fencing or bunding will be required to address residual impacts. 
Bioenergy
Biomass installations can increase local concentrations of particulate
matter (PM) and Nitrogen Dioxide (NO2). For applications over 50kW an Air
Quality Assessment (AQA) may be required, and will be required within the
Perth Air Quality Area. SEPA guidance should be referred to for installations
over 20MW. All biomass applications should include:
• boiler size (kW)
• manufacturer’s brochure. 
• Stack height above ground level
• Stack internal diameter
• Height of nearby buildings within 5 times the stack height including
the boiler building
• Maximum emission rates for NO2 and PM10 in g/s
When choosing a location for Biomass neighbouring properties, relative
heights, window locations, topography and dispersion effects should be
taken into account. Dispersion modelling may need to be mapped for large
installations. Manufacturer’s recommendations must be adhered to with
regards the fuel type and moisture content and covered fuel storage. 
Gases produced from anaerobic digestion and associated CHP can impact
on air quality. Most proposals will need an AQA and to demonstrate
exhaust emissions and flare operations adhere to SEPA Waste Guidance.
AD plants should re-use their own low grade waste heat where possible
3.4 Landscape and Visual Impacts
Key Policies:
• NPF4 Policy 11: Energy
• NPF4 Policy 4: Natural Places
• NPF4 Policy 7: Historic Assets and Places
• NPF4: Policy 8: Greenbelt
• LDP2 Policy 39: Landscape
Key Guidance:
• Planning and development: landscapes | NatureScot
• Planning and development: renewable energy | NatureScot
• Wind farm impacts on landscape | NatureScot
• PKC Supplementary Guidance - Landscape 
• Guidance on Aviation Lighting Impact Assessment | NatureScot
Landscape Policies
• LDP2 Policy 39 sets out locally important impacts to address in
submissions including factors such as local distinctiveness and the
experience of the night sky. 
• NPF4 Policy 4(a) states that unacceptable impacts on the natural
environment will not be supported. This includes landscape
impacts.
• NPF4 Policy 11(b) bars wind farms from National Parks and National
Scenic Areas. The relevant National Park should be referred to for
guidance on other renewable development. 
• NPF4 Policy 11(d) refers applicants to Policy 4 for impacts on
international and national designations, this includes landscape
designations.
• NPF4 Policy 11(e)(ii) states significant landscape and visual impacts
from all forms of renewable energy proposals must be addressed. 
• NPF4 Policy 4(c) sets out requirements in relation to impacts on
National Parks and National Scenic Areas 
• NPF4 Policy 4(d) addresses local landscape areas. 
• NPF4 Policy 4(g) addresses Wild Land Areas and wild land impact
assessments. 
• NPF4 Policy 7 includes landscape protections of historic features

Page 13

Renewable and Low Carbon Energy Guidance          11 
• NPF4 Policy 8 addresses applications in the Greenbelt
Interpretation of Policy 11(e)(ii)
“ Significant impacts… are to be expected from some forms of
renewable energy. Where such impacts are localised and/or
appropriate design mitigation has been applied, they will generally be
considered to be acceptable„ NPF4 Policy 11(e)(ii)
Some forms of renewable energy:  refers to wind installations only.
Localised: refers to the immediate neighbouring location only.
Appropriate design mitigation: requires that all reasonable mitigation has
been applied to reduce significant impacts taking into account the factors
in LDP2 Policy 39 including the local importance and use of the landscape,
and the qualities of landscape character types and designated landscapes.
Generally be considered acceptable.  Acceptability is subject to the tests
in NPF4 Policy 4 including Policy 4(a) and consideration of matters
addressed in other policies including greenbelt, heritage, and quality of
place. 
Interpretation of Greenbelt Policy
NPF4 Policy 8 Greenbelt sets out requirements to be met for proposals in
the greenbelt informed by LDP2 Policy 43. These are additional to NPF4
Policy 11 and include the following:
“reasons are provided as to why a green belt location is essential and
why it cannot be located on an alternative site outwith the green belt;„
LDP2 requires a statement setting out reasons why a green belt location is
essential and must identify the search area and the site options assessed 
“the purpose of the green belt at that location is not undermined; „
The purpose of the greenbelt in LDP2 is to protect and enhance the
character, landscape setting and identity of settlements
“the proposal is compatible with the surrounding established countryside
and landscape character;
the proposal has been designed to ensure it is of an appropriate scale,
massing and external appearance, and uses materials that minimise
visual impact on the green belt as far as possible; and
there will be no significant long-term impacts on the environmental
quality of the green belt„
Long-term impacts are less than permanent and those beyond short-term
changes such as construction or as planted screening develops. This is
regardless of whether the impacts are theoretically reversible. Wind
proposals are assumed to be a permanent change. 
All Proposals
Renewable energy installations can impact on the character of the
landscape as a result of the design, size, and layout of the installation, and
associated infrastructure against the landscape. 
Visual impacts also arise from people’s perception of installations as seen
from homes and public locations (receptors). 
All submissions should consider whether the proposal will affect:
• The landscape character taking into account scenic value, and
areas sensitive due to historic and cultural or recreational value.
• Impacts on the landscape of, and views from and to Local
Landscape Areas, National Parks, National Scenic Areas, Wild Land
Areas
• Impacts on the setting of, and views to and from, scheduled
monuments, historic battlefields and Gardens and Designed
Landscapes 
• Views to iconic and locally important landmarks including the
Highland Boundary Fault and iconic viewpoints
• Views from important viewpoints including Munros, and viewpoints
indicated on OS maps.
• Views from neighbouring receptors including dwellings, core paths
and other popular recreation routes, Principal Tourist and Amenity
Routes and recreation areas
• Landscape character of the greenbelt

Page 14

Renewable and Low Carbon Energy Guidance          12 
Submissions should also address any cumulative impact on the issues
above. See section 3.20 
Landscape and Visual Impact Assessments (LVIA) 
The assessment required of the landscape and visual impact of the
proposal will be proportional to the scale and nature of the development
and the sensitivity of the location ranging from simple site photographs
and design drawings, through Landscape and Visual Appraisals (LVA)
and Landscape and Visual Impact Assessments (LVIA). The Planning
Authority will help identify the extent of assessment required, the zone of
theoretical visibility (ZTV) and relevant viewpoints and receptors. 
All appraisals and assessments must follow: 
• Guidelines for Landscape and Visual Impact Assessment (3rd ed)
| The Landscape Institute 
Small and medium wind turbines submissions will be assessed in
accordance with:
• Assessment of The Impact of Small Scale Wind Energy Proposals
on the Natural Heritage | NatureScot 
Large Turbines and Wind Farm submissions must adhere to:
• Visual Representation of Wind Farms | NatureScot
• Siting and designing wind farms in the landscape | NatureScot
The Landscape character of Perth and Kinross is described in:
• Landscape Study to Inform Planning for Wind Energy| DTA
• Landscape Character Type Descriptions | NatureScot. 
All assessments should take into account any changes in landscape
capacity since the publication of these studies using professional
judgement
Assessment information required
All proposals Site photographs, design details and
technology specifications
All photographs and visualisations should
clearly demarcate the site boundary including
access tracks.
Micro wind Basic ZTV and photomontages in sensitive
locations.
Small & Medium
turbines
Detailed design and location information and
visualisations. A 15km ZTV and LVA with
visualisations from key viewpoints
Large turbines & wind
farms
LVIA with a ZTV to a minimum of 20km.
Visualisations from key viewpoints in
proportion to proposal. Cumulative map of
proposals within 20km
Hydro Site photographs of watercourses and
affected construction areas. LVA for local
applications, LVIA for major, EIA or where
sensitive landscape affected
Solar Farms & Energy
Storage
Visualisations. LVA if affecting heritage or
landscape designation; LVIA for major, EIA and
cumulative assessment of both solar and
energy proposals
Enabling Infrastructure Visualisations. LVA if affecting a heritage
interest or landscape. LVIA for major, EIA
All proposals should demonstrate how landscape and visual impacts have
been mitigated through:
• Careful selection of site and route of tracks at design stage
• Considering the siting and design of infrastructure at an early stage
in consultation with communities and stakeholders
• Using design, materials, and colour that best fit with the built,
historic and natural environments
• Using scale appropriate to nearby buildings, trees, pylons and
landforms
• Siting infrastructure near existing structures

Page 15

Renewable and Low Carbon Energy Guidance          13 
• Siting all turbines and large installations to avoid significant adverse
visual and landscape impacts as seen from Principal Tourist and
Amenity Routes
• Using existing topography, landscaping and natural screening to
minimise impacts
• Undergrounding of pipework, penstock and cabling where possible;
and the use of landscaping and natural screening where
undergrounding is not possible
• Timely restoration of tracks, trenches, construction compounds,
laydown areas and borrow pits to match the surrounding
environment
• Demonstration of effective mitigation through a Habitat
Management Plan or Landscape Management Strategy.
• Planted screening should be multilayered, and of sufficient height to
screen impacts through all seasons. 
Iconic Viewpoints and the Highland Boundary Fault
Major and EIA proposals including grid infrastructure visible from
important viewpoints including Munros and iconic viewpoints
should assess impacts on those views and provide visualisations 
The Highland Boundary Fault is a distinctive, topographical,
cultural and geological feature running through Perth and Kinross
which is sensitive to wind turbines on its top or, as seen from the
Lowlands side, in front of or on the fault slope itself. Visual
impact assessments will be required for large turbines and wind
farm proposals within 2km of the northern edge, and 5km of the
southern edge of this feature to demonstrate that views of the
skyline or natural beauty of this feature are not significantly
adversely affected.

Page 16

Renewable and Low Carbon Energy Guidance          14 
Landmark Features and Iconic Viewpoints
Dotted Line indicates potential visibility for wind turbines
Source: David Tyldesley and Associates (2010) Landscape
Study to Inform Planning for Wind Energy

Page 17

Renewable and Low Carbon Energy Guidance          15 
National Scenic Areas and National Parks 
Under NPF4 Policy 11b wind farms proposed in National Scenic Areas
(NSAs) and National Parks will not be supported. 
Any turbine >12 m in an NSA needs planning permission and consultation
with NatureScot. Most turbines, hydro installations and hill tracks, and
other large installations can have adverse landscape and visual impacts at
a distance including across boundaries to both NSAs and National Parks.
Where in or visible from NSAs and National Parks submissions should
show they do not have a significant adverse impact on the special
landscape qualities of the designation or their gateways with reference to
the relevant guidance. Proposals will specifically be assessed in relation to
NPF4 Policy 4c.
See Guidance:
• The Special Landscape Qualities of LL&TNP (NatureScot, 2010)
• The Special Landscape Qualities of Cairngorms National Park
(NatureScot, 2010)
• The Special Qualities of National Scenic Areas (NatureScot, 2010) 
Wild Land Areas 
NPF4 Policy 4(g) sets out the requirements for assessment in relation to
Wild Land Areas and the requirement for a Wild Land Impact Assessment
to demonstrate minimisation of significant impacts. Policy 4(g) is subject to
the qualification in policy 4(a).
• Wild Land Area descriptions and assessment guidance |
NatureScot.
Local Landscape Areas 
Local Landscape Areas (LLAs) in Perth & Kinross and neighbouring
authorities should be considered of regional importance in LVIA. Views
both to and from these landscapes should be addressed. Significant
impacts on these areas must be localised or appropriately mitigated with
reference to Policy 4(a), 4(d) and PKC Supplementary Guidance on
Landscape.

Page 18

Renewable and Low Carbon Energy Guidance          16

Page 19

Renewable and Low Carbon Energy Guidance          17 
Wind
For the siting and design of all wind turbines above 15m in height and
associated infrastructure, applicants will be assessed against:
•  Siting & Designing Wind Farms in the Landscape | NatureScot 
• Guidance on Aviation Lighting Impact Assessment | NatureScot
This will help submissions to address:
• The fit of turbines within the landscape depending on the number,
scale, pattern and colour of turbines against the scale, form,
complexity and cover of the landscape
• The prominence of turbines including on ridge lines, on loch and
river shores and in areas of wildness, remoteness or tranquillity
• The siting of turbines on the site in relation to each other, other
structures and site topography, as viewed from different receptors
• The location and fit within the pattern of existing turbine(s)
• The relation of turbine(s) in size, character and location in the
context of nearby dwellings and other buildings, monuments,
conservation interests and locally important natural features
• The cumulative impact of all sizes of turbines with existing and
proposed turbines and other infrastructure including pylons
• The landscape and visual impact of foundations, transformers,
cranes, crane pads, tracks, construction compounds, borrow pits,
and grid connection infrastructure
• The impacts of aviation lighting on the night sky.
Cumulative impacts from new turbines that risk coalescence between
existing wind farms or turbine clusters leading to a wind farm landscape
should be avoided. Repowering applications may provide an opportunity to
reduce existing cumulative impacts by removing or redesigning elements in
the landscape. 
A Cumulative Landscape and Visual Impact Assessment (CLVIA) will be
required for large turbines and wind farms where there are existing, or
proposed turbines within a cumulative zone agreed with the Planning
Authority. CLVIAs should adhere to NatureScot guidance Assessing the
Cumulative Impact of Onshore Wind Energy Developments (2021) and
should address:
• All existing, consented or submitted wind applications
• Other large or tall industrial features including pylons
• Structures outside the Council area, including for sequential
impacts
• Effects on landscape character; and the qualities of landscape
designations including Local Landscape Areas and Wild Land
• Combined and successive cumulative impacts
• Sequential impacts on amenity, tourist and recreational routes
• Impacts of infrastructure such as tracks, crane pads and borrow
pits.
Proposals for small and medium turbines should consider other existing
turbines within 1km. Siting and design choice will help avoid creating
confusion or clutter through different designs or heights.
The siting and design of micro wind turbines should use scale, design,
materials and colour that best fit with the surrounding environment and
any other turbines. Micro wind is best sited in association with existing
buildings or structures and can be located carefully or screened to avoid
visual impacts.
Hydro
Impacts from hydro schemes will depend on the sensitivity of the location
and the extent of infrastructure. National Parks, NSAs, LLAs, and WLAs
should be avoided if impacts cannot be sufficiently mitigated. 
The contrast of hill tracks and penstock routes with the existing landscape
during and post construction should be minimised through siting, such as
using natural features like narrow valleys to reduce the extent of
construction required and using existing tracks or alternative delivery
methods. 
Impacts of artificial materials in semi-natural and rural environments
should be minimised by:
• ensuring a low profile of in-river structures
• choosing appropriate materials and finishes of buildings, railings,
fencing and pipework 
• reusing or restoring historic weirs.

Page 20

Renewable and Low Carbon Energy Guidance          18 
Any visible pipework including pressure release valves can be aligned with
land use patterns and vegetation, and transformers and associated fencing
can be screened. Powerhouses should be placed underground, in existing
buildings, or in new buildings in keeping with local character. 
Cumulative impact assessments may be required where the proposal is
affecting a landscape designation, and/or other hydro installations or
proposals are in the ZTV.
• Hydro Schemes and Natural Heritage | NatureScot
• Guide to Hydro Construction Good Practice | NatureScot
Solar
Micro-generation solar installations will have minimal impacts but should
demonstrate they do not have a detrimental impact on heritage features. 
Solar farm impacts may include the visual impacts of the panels and
frames themselves although due to the sunlight absorbing nature of panels
and their low profile, from a distance they can seem like water or a
ploughed field. 
The size and layout of the solar farm should be commensurate with the
surrounding landscape to reduce significant effects. Contours and
enclosure patterns of the landscape created by topography, field patterns,
paths, woodland, walls and hedges should be reflected and reinforced
through layout and landscaping. 
Local impacts including that of inverters and transformers, other electricity
infrastructure, and security fencing can be softened by use of topography
or planting as screening. 
Proposals must be set back from recreational routes and intervening native
vegetation introduced to ensure the experience of the wider countryside is
maintained. Screening landscaping should be selected and maintained to
ensure views on wider landscapes are not blocked. Any security lighting
must be on an infrared trigger only.
Except on brownfield land, hardstanding should be avoided wherever
possible.
• General pre-application and scoping advice for solar farms |
NatureScot
Cumulative impact assessments are required where there are other
existing or proposed solar or energy storage installations within the agreed
ZTV. This must also address sequential impacts along recreational or
tourist routes.
Energy Storage
Proposals should address landscape and visual impacts arising from the
battery storage/container units, transformers, inverters, switchrooms,
welfare units, fencing, substations, access tracks, water towers, and
security fencing. 
Due to the industrialised nature of battery storage proposals are best sited
immediately next to substations or associated renewable energy
developments. 
Industrial sites in the countryside and greenbelt risk having an
unacceptable landscape and visual impact. Impacts on the setting of
landscape and historic designations, recreational routes and settlement
character must be addressed. 
Local impacts can be softened by use of topography, bunds or planting as
screening but may need to be well set back from roads or recreation routes
in countryside settings. The existence of vertical infrastructure such as
pylons in the landscape do not necessarily result in a lesser impact of an
installation on the horizontal character of a setting or landscape,
particularly where situated at a distance. 
Proposals must be set back from recreational routes and intervening native
vegetation introduced to ensure the experience of the wider countryside is
maintained. Screening landscaping should be selected and maintained to
ensure views on wider landscapes are not blocked. 
Cumulative impact assessments are required where there are other
existing or proposed solar or energy storage installations within the agreed
ZTV. This must also address sequential impacts along recreational or
tourist routes.

Page 21

Renewable and Low Carbon Energy Guidance          19 
Enabling Infrastructure
Proposals for substations should be associated with other industrial
infrastructure as far as possible, and screened with materials and
landscaping appropriate to the location. Refer to energy storage above. 
Routing options of new/extended/upgraded transmission or connection
lines should address impacts on landscape character types, local
landscape areas, settlement visibility and recreational and tourist routes.
Early engagement with PKC and NatureScot is essential.

Page 22

Renewable and Low Carbon Energy Guidance          20 
Source: David Tyldesley and Associates (2010) Landscape
Study to Inform Planning for Wind Energy

Page 23

Renewable and Low Carbon Energy Guidance          21 
3.5 Public Access, Recreation and Scenic Routes
Key Policies:
• NPF4 Policy 11e (iii)
• LDP2 Policy 14: Open Space Retention and Provision
• LDP2 Policy 15: Public Access
• LDP2 Policy 33: Renewable and Low Carbon Energy
• LDP2 Policy 40: Green Infrastructure
Key Guidance
• Green & Blue Infrastructure Guidance | PKC
• Core Paths Plan | PKC
All Proposals
Large scale applications can impact on recreation through land take and
applicants should engage with recreational organisations to help identify
users and evaluate recreational value. LDP2 Policy 14A: Existing Areas
requires protection of areas of land with value to the community including
for recreational or amenity purposes including outside settlement
boundaries subject to limited exceptions. 
LDP2 Policy 15: protects all designated and well-used routes. Recreational
routes or access to recreational activities should be identified and adverse
impacts addressed including through provision of alternative routes. An
access management plan will help ensure safety. 
Infrastructure should be sited and designed to minimise impacts on views
from key locations for public access and recreation, as well as scenic
routes. Enhancement to recreational access or facilities should be
considered. See Section 3.4 on Landscape and Visual Impact for more
information.
Wind
Wind farms can have substantial visual impacts on recreational and
tourism use. Proposals should avoid having significant visual impacts on
views from the A9 corridor and iconic viewpoints. Submissions should
address impacts on views to National Park gateways, the Highland
Boundary Fault and local landmarks. 
Hydro
Hydropower can impact through visual impacts and access restrictions
during construction. Weirs should be designed and sited to address
impacts on, or enhance, recreational experience and consider
enhancements such as public access across weirs. Changes in water flow
may also affect water-based tourism and recreation. Submissions should
provide a notification plan for water releases affecting users.
Solar
Large solar farms may impact recreation through land take and disruption
to recreation routes. In addition to access considerations, submissions
should address views of and from local tourist landmarks and principal
tourist routes. 
Energy Storage, Bioenergy and Enabling Infrastructure
In addition to any access considerations, submissions should address
views of and from local tourist landmarks and principal tourist routes.
3.6 Aviation and Defence Interests
Key Policies:
• NPF4 Policy 11(e)(iv)
• LDP2 Policy 61: Airfield Safeguarding
Key Guidance
• Airfield Safeguarding Guidance | PKC
All Proposals
All tall structures, including construction cranes, turbines, flues and
flarestacks, can present a hazard to air navigation. Consultation is required
for applications within the safeguarding zone of Perth, Fife and Dundee
airports, or any Perth and Kinross airfield as shown on the Aviation and
Defence Safeguarding Map. Any proposed technical mitigation measures
will need to be agreed by the relevant authorities.

Page 24

Renewable and Low Carbon Energy Guidance          22 
Wind
Wind turbines can disrupt communication and navigation, and along with
cranes and anemometers can interfere directly with aviation. Applicants
are encouraged to engage with the planning team and relevant aviation
bodies before committing to a site or design. 
Applicants should consult the airport or airfield operator where wind
proposals are located within the safeguarding zones of airfields and Perth,
Fife, Dundee or Edinburgh airports shown on the Aviation and Defence
Safeguarding Map. CAA and NATS will be consulted for all turbines.
The Ministry of Defence (MOD) will also be consulted on all applications
over 11m or with a rotor diameter of 2m and all wind applications within the
Munduff Hill weather radar safeguarding zone. Mitigation measures such as
lighting, siting and technical features will need to be agreed by the relevant
authorities and included in visual impact assessments.
Solar
Large arrays have limited potential for impacts on navigation from
reflection, glare and security lighting. The relevant aerodrome or airfield
operator should be contacted for any ground mounted Solar PV application
within the airfield safeguarding zones.
Applications proposing solar tracking systems will also require
consultation with Ministry of Defence (MOD), Civil Aviation Authority (CAA)
and National Air Traffic Services (NATS).
3.7 Telecommunications and Broadcasting
Installations
Key Policies:
• NPF4 Policy 11e (v) 
Wind
Interference with radio communication and local television and radio
reception should be assessed prior to development. Ofcom can provide
advice on relevant operators and the Joint Radio Company can undertake
screening for telemetry used by energy utilities. 
Developers will be expected to resolve any potential issue with the relevant
operators or, in the case of interference with TV and radio signals, with
individual occupiers.
3.8 Roads and Transport
Key Policies:
• NPF4 Policy 11(e)(vi) 
• NPF4 Policy 13: Sustainable Transport
• LDP2 Policy 33A(g)
• LDP2 Policy 60: Transport Standards and Accessibility
Requirements
Key Guidance
• National Roads Development Guide | SCOTS
• Transport Planning Guidance | PKC
All Proposals
Construction vehicles, delivery of infrastructure and materials, and
ongoing fuel deliveries can cause significant disruption to transport routes,
rural roads, and safety, amenity and air quality in towns and villages. Road
alignment or widening, and physical impacts on the road surface condition
will also need to be addressed. In consultation with the relevant road
authorities, a Transport Assessment, covering impacts on the road
network, and a Construction Traffic Management Plan (CTMP), are likely to
be required for large proposals. 
Transport assessments and associated CTMP should show adverse
impacts are avoided, mitigated or minimised including:
• Routes, timing, and number of vehicles for construction and
ongoing fuel, feedstock or digestate movements are designed to
minimise disruption
• Consideration of the cumulative impacts of fuel delivery where
routes are affected by existing HGV deliveries

Page 25

Renewable and Low Carbon Energy Guidance          23 
• Sites are designed for safe access and operation including in
emergency situations
• Works and final installations are designed, sited and screened to
prevent distraction to passing drivers.
3.9 Historic Environment
Key Policies:
• NPF4 Policy 11(e)(vii)
• NPF4 Policy 7 (Historic Assets and Places)
• LDP2 Policy 33 (Renewable and Low Carbon Energy)
• LDP2 Policies 26-31 (Historic Environment Policies)
Key Guidance
• Historic Environment Policy for Scotland | Historic Environment
Scotland (HES)
• Managing Change: Setting | HES
• Managing Change: Micro-Renewables | HES 
• Planning Advice Note 2/2011 Planning and Archaeology 
• Interactive Heritage Map | PKC
• Listed Building Consent and Conservation Area Checklists | PKC
All proposals
Installation can affect the fabric and setting of historic interests and
underlying archaeology. Reducing energy consumption and improving
energy efficiency must be addressed before considering more intrusive
measures that installations that may have an adverse impact on the
historic character and interest. 
While some permitted development rights apply for the installation of
renewable energy measures in listed buildings or conservation areas, listed
building consent and/or planning permission will likely be required. 
Roof mounted technology and flues may impact on the historic fabric and
special interest of listed buildings, and must be carefully considered on a
case by case basis. In conservation areas they should be carefully installed
and discretely sited to protect the historic character or and appearance of
the area. 
The visual impact on heritage assets including historic battlefields, gardens
and designed landscapes, listed buildings, and conservation areas and
their settings must be taken into account in the development of renewable
energy projects. Large installations may affect the setting of or views
to/from heritage assets and will not be acceptable where they have
significant adverse effects, as assessed against NPF4 Policy 7. Landscape
and visual appraisals should clearly address potential adverse effects and
appropriate mitigation. 
All installations requiring ground disturbance should identify known
archaeology and the potential for archaeology across construction sites
through discussions with the Perth and Kinross Heritage Trust (PKHT).
Where known or potential archaeological resources may be affected, a
mitigation plan should be developed in association with PKHT. Mitigation
may include recording finds or providing enhancement for acceptable
proposals such as interpretative signage. 
Proposals with significant transport requirements for construction or
ongoing fuel delivery should also ensure historic structures are protected
from vibration, ground disturbance or overly heavy loads. 
There may be potential to incorporate existing historic buildings and
structures into proposals. Hydro proposals, for example, could include
sensitivity repair and reuse of historic weirs, waterwheels and mill lades. 
The use of existing ancillary buildings for heat pump plant rooms and
bioenergy could ensure new renewable proposals are more sensitive to
historic settings, where it is ensured that new pipework or vibrations will
not damage historic fabric.

Page 26

Renewable and Low Carbon Energy Guidance          24 
3.10 Hydrology, Water Environment and Flood Risk
Key Policies:
• NPF4 Policy 2(b): Climate Mitigation and Adaptation
• NPF4 Policy 11(e) (viii)
• NPF4 Policy 20: Blue and Green infrastructure
• NPF4 Policy 22: Flood Risk and Water Management
• LDP2 Policy 45: Lunan Lochs Catchment Area
• LDP2 Policy 47: River Tay Catchment Area
• LDP2 Policy 52: New Development and Flooding
• LDP2 Policy 53: Water Environment and Drainage
Key Guidance
• Guidance and advice notes | SEPA
• Flood Risk Standing Advice | SEPA
• Vulnerability Guidance | SEPA
• Diffuse pollution in the urban environment | SEPA
• Guidance on assessing the impacts of development proposals on
groundwater abstractions | SEPA
• Abstractions Guidance | SEPA
• Flood Risk and Flood Risk Assessments | PKC
• Flood Risk Management Plans | PKC
• SUDS manual C753F | CIRIA
• Engineering in the Water Environment Guidance | SEPA
All proposals: Hydrology and Water Environment
Activities affecting the water environment may require a Controlled
Activities Licence (CAR) licence from SEPA including in river engineering
work; this includes all hydropower applications and water source heat
pumps; and drainage. Authorisation  may also be required for abstraction
of water for construction, water storage or to de-water excavations, and
surface water and construction run-off. The planning team will consult
closely with SEPA to assess applications, identify conditions and co-
ordinate with CAR applications. SEPA guidance contains checklists to
assess whether proposals will be able to obtain a water use licence. 
See: CAR A Practical Guide | SEPA 
Any large installation or excavation works may impact on the water
environment through changes to hydrology, water supplies and water
quality through construction excavation, drainage, and de-watering while
compacted areas, tracks and hardstandings may lead to increased runoff.
These changes may lead to impacts on private water supplies, aquatic and
terrestrial habitats and species including Ground Water Dependent
Terrestrial Ecosystems (GWDTEs).
Assessments and Evidence Required:
• Where required Construction Method Statements should map
construction areas and storage compounds and identify all onsite,
and connected, watercourses, lochs, water supplies, and wetlands;
and appropriate buffers 
For all major and EIA proposals, and all hydropower proposals:
• A draft CEMP 
• Identify all private and public water supplies in the site catchment,
assess impacts and identify mitigation for water supplies
• Consult Scottish Water for advice on precautions where
development may affect a Protected Water Area
• Consult NatureScot on any proposals that may affect a Protected
Area or Protected Species
• Surveys should extend beyond the site boundary to recommended
distances taking micro-siting into account
• A Phase 1 habitat survey can identify wetlands. A National
Vegetation Classification (NVC) of each wetland will identify
GWDTEs and other habitats dependent on surface and ground
water.
• Identify and avoid impacts on groundwater abstractions and
GWDTEs within a minimum of 10m from all development, 100m of
excavations < 1m and 250m from excavations >1m.
Early consideration of site and route selection is the best way to avoid
sensitive habitats including wetlands and water supplies, abstractions and
drinking water supply. 
Impacts are best managed by adherence to best practice construction per
NatureScot and SEPA Guidance.

Page 27

Renewable and Low Carbon Energy Guidance          25 
Roads, tracks and trenches (excavations <1m depth) should be
sited/routed 100m from abstractions and GWDTES; and excavations and
buildings (>1m) 250m away. A site-specific assessment will be required if
these buffers cannot be achieved. Any effects on GWDTEs should be
assessed, avoided and mitigated in line with SEPA guidelines. 
Water crossings should be avoided where possible and where unavoidable
address SEPA and PKC Guidance mitigation requirements. 
Minimising vegetation removal and timeous post construction remediation
can reduce sedimentation. SUDS are required for construction and
operation to treat and control run-off. Drainage to SUDS must be in place
before any excavation with construction drainage and SUDS separated
from clean water flows.
Natural waterflows must be maintained across habitats. This can be
helped by minimising the use of impermeable surfaces and using
permeable access tracks. Drainage must be designed in line with PKC and
SEPA Guidance. 
All Proposals: Flood Risk 
NPF4 Policy 22(a) provides an exception for essential infrastructure in a
flood risk area (as defined in NPF4 glossary) “where the location is required
for operational reasons” provided it will:
“  (i) not increase the risk of surface water flooding to others, or itself be at risk 
(ii) manage all rain and surface water through [SUDS]…
(iii) seek to minimise the area of impermeable surface„ Policy 22(c) 
SEPA and PKC Guidance on flood risk and Flood Risk Assessment, and
drainage impact and Drainage Impact Assessment must be adhered to.
Roads and tracks should avoid the functional floodplain. Secondary egress
for safety reasons may be considered. Buildings and structures will depend
on adherence to flood risk guidance in line with SEPA vulnerability
guidance. 
If development in a flood risk area as defined in NPF4 is required,
proposals must demonstrate why this is the case for operational reasons
including reasons why alternative areas outwith flood risk areas are not
suitable. Operational reasons will be assessed in terms of the criticality of
having the proposal within a flood risk area, for it to be able to operate, and
not financial reasons. Mitigation must be in place to ensure the
requirements of policy 22(c) are addressed.
Local Flood Risk Management Plans must be referenced and proposals
should contribute to and must not adversely affect the mitigation actions
contained within.
Drainage management of the site must avoid any increase in flooding
downstream, particularly on Potentially Vulnerable Areas identified in Local
Flood Risk Management Plans. Inappropriately designed weirs, tracks and
river crossings can introduce an increase in flood risk. 
• A Drainage Impact Assessment may be required where there are
new tracks or hardstandings, or where the proposal may affect a
sensitive area as set out in PKC Guidance on flood risk and Flood
Risk Assessment.
• A Flood Risk Assessment will be required if a development is
proposed within a flood risk area as defined in the NPF4 glossary.
Wind
Large Turbines and Wind Farms are likely to have significant impacts due to
construction de-watering, excavations, tracks and crane pads. 
Following careful site selection, siting of turbines and design of tracks and
hardstandings must take into account existing ground cover, waterlogging
and slope, the proximity and connection of the water environment. 
Submissions must show how potential run-off and pollution are addressed
through SUDS and drainage and a drainage impact assessment is likely to
be required. Drainage proposals must be designed to allow maintenance
per the SuDS Manual requirements. 
Mitigation as recommended by Ecological Clerk of Works must be followed
and further measures may be required including:
• a water quality management plan to ensure water protection
measures are monitored and maintained

Page 28

Renewable and Low Carbon Energy Guidance          26 
• Monitoring of identified water sensitivities and GWDTEs; with plans
for remedial action.
See: Good Practice During Windfarm Construction | NatureScot
Hydro
Given the in-stream nature of hydro construction and operation particular
care must be taken for both site selection, construction and operation. See
SEPA guidance for in stream works.
Water quality and hydrology can be affected by construction run off and
scouring, sedimentation, and submerged vegetation. 
Areas sensitive to changes in hydrology and morphology must be avoided.
Submissions must address how water quality, hydrology and morphology
of both construction and operation will be mitigated with best practice
construction shown through the CMS and CEMP. A water quality
management plan may be required to ensure water quality protection
measures are monitored and maintained.
Changes to water flow from flow diversion, transfers from other
catchments, engineering works, weirs, intakes and outfalls may also
change morphology and hydrology with impacts on fish passage,
recreation and tourism and water supplies. Inflow and outflow must be
carefully designed and sited and transfers between otherwise
unconnected watercourses avoided. Impacts on areas sensitive due to
water abstraction, and agricultural abstraction and groundwater quality
must be avoided or impacts mitigated. 
Information on flow including compensation flow, must be provided along
with an assessment of downstream effects. 
All weirs will give rise to some degree of local water level change and
potentially temperature change and should be taken into account in
assessing aquatic ecology. 
All submissions must demonstrate that watercourse crossings and in-river
engineering can cope with extreme rainfall, and powerhouses and other dry
land infrastructure is designed and sited in accordance with NPF4 Policy
22.
A cumulative impact assessment will be required where there are existing
hydropower structures or proposals on the tributary particularly where
there are agricultural abstractions or good groundwater quality.
Guidance:
• Hydroelectric power | NatureScot
• Hydropower | SEPA
Solar, Energy Storage & Enabling Infrastructure
Impacts on the water environment from surface run-off from panels, non-
permeable foundations, areas of hard-standing, erection of buildings,
compaction and tracks must be considered. 
Vegetation around and under solar arrays should be retained for wildlife or
grazing, and permeable access tracks used along with localised SUDS for
any run-off (per NPF4 Policy 22(c)(ii). 
Site selection should take into account electricity infrastructure
vulnerability to flood risk, with careful siting and design of inverters and
transformers to reduce flood risk in line with NPF4 Policy 22. Battery
storage is unlikely to be suitable in flood risk areas.
Run-off from battery storage firewater is not covered by SEPA authorisation
and must be contained to prevent pollution of the water environment (See
section 3.13). Containment ponds/impoundments for firewater from an
authorised abstraction will not need SEPA approval but should be filled
during winter months.
3.11 Biodiversity 
Key Policies:
• NPF4 Policy 3: Biodiversity
• NPF4 Policy 4: Natural Places
• NPF4 Policy 11(d): Energy
• LDP2 Policy 42: Green Infrastructure
• LDP2 Policy 33: Renewable & Low Carbon Energy
• LDP2 Policy 45: Lunan Lochs Catchment Area
• LDP2 Policy 47: River Tay Catchment Area

Page 29

Renewable and Low Carbon Energy Guidance          27 
Key Guidance:
• Renewable energy | NatureScot
• Planning and development advice | NatureScot
• Biodiversity | SEPA
• Planning for Nature Guidance | PKC
• NPF4 Policy 3 Interim Guidance Note | PKC
• Perth & Kinross Nature Networks | PKC
• Tayside LBAP | Tayside Biodiversity Partnership (TBP)
• TBP Development Guidance | TBP
• Local Nature Conservation Sites | PKC
• Planning and development: protected areas | NatureScot
• Site Link for Protected Areas | NatureScot
• Bats and onshore wind turbines survey assessment and mitigation |
NatureScot 
• Guidance on SACs and SPAs | PKC
• Habitats Regulations Appraisal (HRA) | NatureScot  
• Planning and development: protected species | NatureScot
Natural Places 
NPF4 Policy 4 sets out the requirements for new developments in relation
to natural places. This includes a general statement in policy 4(a):
“ Development proposals which by virtue of type, location or scale will have an
unacceptable impact on the natural environment, will not be supported„
NPF4 Policy 4(a)
NPF4 Policy 4 sets out tests for protected areas, local designations and
protected species. These cover national parks, landscape, biodiversity, and
protected species.  Note Landscape and Visual impacts are addressed in
section 3.4. 
The following guidance and supporting information should be referred to in
preparing submissions:
Biodiversity
NPF4 Policy 3 sets out the requirements for new developments in relation
to biodiversity including significant biodiversity enhancement for national,
major and EIA developments, and enhancement for local proposals. The
mitigation hierarchy and nature networks are key to all proposals. For the
avoidance of doubt all submissions should demonstrate that the mitigation
hierarchy has been addressed in the order as set out in the NPF4 Glossary.
Major and EIA proposals should refer to Scottish Government guidance,
and local proposals must be in accordance with NatureScot’s Developing
with Nature guidance. 
The Council Planning & Biodiversity webpage provides our Planning for
Nature Guidance including minimum mitigation requirements, an Interim
Guidance Note on information required to support NPF4 Policy 3, and
information on nature networks and local biodiversity sites.
Geodiversity 
NPF4 Policy 4(c) and 4(d) includes impacts on nationally significant SSSIs
and candidate Local Nature Conservation Sites which are designated for
their geological value. Geological Review Sites (GCRs) are generally
covered by one of these designations but are of national or international
significance requiring notification to NatureScot. Impacts on GCRs fall
within the scope of NPF4 Policy 4(a). Mitigation of impacts on geodiversity
should be based on the qualities for which sites are designated. In general
proposals should not impede the access, visibility or experience of these
sites. 
Relevant habitat and species records
• Scottish Biodiversity List
• Tayside Local Biodiversity Action Plan
• NBN Atlas
• Tayside Raptor Study Group
• Scottish Badgers
• NatureScot (FWPM)
• Tay District Salmon Fisheries Board
• BSBI
• Fife Nature (Kinross area only)

Page 30

Renewable and Low Carbon Energy Guidance          28

Page 31

Renewable and Low Carbon Energy Guidance          29

Page 32

Renewable and Low Carbon Energy Guidance          30 
All Proposals
All proposals should show how impacts on natural heritage have been
avoided, mitigated and compensated for, and how biodiversity will be
enhanced, in line with the above policies and associated guidance.
Surveys will be relative to the size, location and sensitivity of the site and
surrounding habitat and can be identified during pre-application enquiries
or EIA scoping discussions. 
All proposals except small scale renewables must be accompanied and
informed by an Ecological Impact Assessment (EcIA) in accordance with
CIEEM Guidelines and include an assessment of the level of biodiversity
enhancement in accordance with our Interim Guidance on NPF Policy 3.
EcIA are expected to be proportionate and for small scale proposals may
be based on a Preliminary Environmental Assessment Report (PEAR).
However, a PEAR alone will not normally be considered sufficient. 
Submissions without EcIA, biodiversity enhancement assessments,
recommended surveys, or with surveys outwith the correct season will
result in applications being delayed or refused. 
Annex 4 of the PKC Planning for Nature guidance provides a helpful
checklist of information required to inform a planning application regarding
biodiversity. Information should be submitted in accordance with the
checklist to reduce future information requests and delays.
Biodiversity, green infrastructure and nature network protection and
enhancement should be implemented throughout the design of the project
from initial design to construction, compensation, restoration, operation
and decommissioning. Submitted designs and landscaping plans should
clearly show where protections, mitigation and enhancement
recommended in the EcIA is being applied.
Site selection and development design is expected to demonstrate
adherence to the mitigation hierarchy in order. Compensation will not be
accepted in place of an impact that could have been avoided by design.
Any unavoidable loss must be compensated in accordance with guidance
before positive measures can be considered enhancement.
Renewable installations can avoid direct loss and fragmentation of
habitats, woodland and green infrastructure through carefully sited
infrastructure and access tracks. 
Considered early, indirect damage to plants and habitats from changes to
soils and hydrology can also be avoided. Infrastructure may also disrupt or
displace wildlife from their foraging, roosting, breeding and commuting
habitats. This may include displacement of birds, badgers, reptiles and
amphibians from breeding and foraging/ hunting grounds; disruption to bat
roosts in woodland, or disturbance/fragmentation of bat foraging habitats
in and near woodland, woodland edges, watercourses, wetlands, lochs
and hedgerows. Even small domestic installations will need to address
impacts on bat roosts and breeding birds in buildings and trees. 
Best practice construction includes working in the correct season for
relevant species, and providing a safe site for wildlife particularly where
there are open trenches or pipework. Measures must be taken on site to
minimise risks of transfer of invasive non-native species. Restoration,
compensation, landscaping and/or enhancement should be carried out as
early as possible and promote biodiversity, climate resilience, flood
protection, and recreation in line with the Council’s Forest and Woodland
Strategy, LBAP and Green Infrastructure guidance.
A landscape plan or habitat management plan should detail mitigation,
restoration, enhancement and monitoring. For Major and EIA proposals, 
conclusions from the EcIA and the requirements detailed in PKC’s Planning
for Nature Guidance should be used to create a Site Biodiversity Action
Plan. This will contain quantity, locations, techniques, timescales, and
monitoring arrangements. Priority species are available in the Tayside
Biodiversity Action Plan and Scottish Biodiversity List. 
Wind
All wind turbines larger than micro turbines can provide a collision risk to
birds’ commuting, hunting or migration flight paths as well as loss or
displacement of birds from breeding, foraging and hunting habitat.
Turbines also pose a collision and barotrauma risk to bats.

Page 33

Renewable and Low Carbon Energy Guidance          31 
Desktop search areas for protected sites and species must consider
ecological connectivity. For example:
• 20km search area for geese and goose SPAs and SSSIs
• 10km search for bats and bat SACs
Additional surveys required include detailed surveys and collision risk
modelling of wintering, breeding, foraging and migrating birds for all EIA
developments. For non-EIA development the level of assessment will be
relative to the risk and connectivity to sensitive areas and populations. 
Cumulative impact assessments on birds and bat populations will be
required for EIA developments in line with NatureScot guidance. 
Site location, layout and choice of turbines should be shown to avoid
adverse impacts. Additional mitigation expected will include a buffer
between turbines and hedges or woodland edges appropriate to bird and
bat species present. A monitoring, shut down or slow turbine plan will
provide further precautionary mitigation. 
Enhancement opportunities for wind include bog and peatland restoration,
woodland restoration to create alternative corridors and contribute to
Nature Networks.
• Onshore wind energy | NatureScot
• Renewable | SEPA
Hydro
Hydropower development can have significant impacts through the
installation of tracks and penstocks, but also operational impacts on the
water environment. 
Changes to water quality, quantity, flow, depth, sediment and temperature
can affect the habitat, food availability, spawning and migration of a wide
range of species. 
Information on the impacts of hydrological changes on relevant species
should be provided. Species include fish surveys as required by SEPA,
aquatic invertebrates, aquatic birds, otters, beavers and bryophytes. 
Impacts on species throughout their lifecycle including migration should
be considered and addressed in site selection and design. Negative
impacts can be avoided or mitigated by using degraded watercourses with
poor ecological status, sites upstream of existing fish barriers, avoiding
sites with poor hydrology, and ensuring the design and location of intakes
and tailraces does not detrimentally affect habitat through changes to
morphology and hydrology. 
Cumulative impacts on protected species should be addressed where
there are other installations in the local catchment. 
Weir location and design should demonstrate that they do not prevent fish,
lamprey and eel access to feeding, breeding and spawning areas. Fish and
mammals can be injured by poorly designed or inadequately screened
intake structures, weirs, tailraces, outfalls and fish passes. Intakes and
outfalls must be screened to protect wildlife.
Use of existing weirs will prevent new fish barriers, or can be upgraded to
restore fish passage where NatureScot advise this is appropriate. Other
enhancement opportunities include natural flood management and
riparian planting to provide shading, water quality improvements and
erosion control.
• Hydroelectric power | NatureScot
• Renewable | SEPA
Solar
Roof mounted PV or solar thermal should not disturb or block access to bat
roosts and bird nests in or on roofs. 
Solar farms, even on arable land, have potential to displace breeding and
wintering birds, mammals, amphibians and reptiles from foraging and
breeding areas. Surveys should assess the existing resource and consider
the location and design of the site and fencing. Siting the solar farm on land
with low biodiversity value with a view to enhancement is encouraged with
a substantive buffer between the site and existing trees or waterbodies. 
The remaining habitat can continue to have value with wildflower meadows
or grasslands under arrays that can support pollinators and ground-nesting

Page 34

Renewable and Low Carbon Energy Guidance          32 
birds. Vegetation should be cut manually in accordance with the plan or by
low intensity grazing. 
Native hedges around the site in addition or substitution to fences can
provide security, screening and habitat. Where fences are used badger
gates and low level gaps for amphibians and hedgehogs will allow
continued use of the site, while passive infrared lighting will reduce
impacts on birds and bats.
• Solar energy | NatureScot
• Renewable | SEPA
Energy Storage and Enabling Infrastructure
Battery storage and enabling infrastructure have potential to displace
breeding and wintering birds, mammals, amphibians and reptiles from
foraging and breeding areas. Surveys should assess the existing resource
and consider the location and design of the site and fencing. Siting the
scheme on land with low biodiversity value with a view to enhancement is
encouraged with a substantive buffer between the site and existing trees or
waterbodies. 
Proposals for enabling infrastructure that involve a corridor of development
e.g. transmission lines, will need to consider impacts across the length of
the site and the impacts on commuting species. Bird surveys in
accordance with NatureScot guidance may be required. 
Native hedges around the site rather than fences can provide security,
screening and habitat. Where appropriate badger gates and low level gaps
for wildlife in fencing will allow continued use of the site, while passive
infrared lighting will reduce impacts on birds and bats.
3.12 Trees, Woods and Forests
Key Policies:
• NPF4 Policy 11(e)(x)
• NPF4 Policy 6: Forestry, Woodland and Trees 
• LDP2 Policy 40: Forestry, Woodland and Trees
Key Guidance
• Forest & Woodland Strategy | PKC
• Planning for Nature | PKC
• Interim Guidance on NPF4 Policy 3 | PKC
• Management of Forestry Waste | SEPA
• Use of trees cleared to facilitate development on afforested land |
SEPA 
• Control of Woodland Removal Policy| Scottish Forestry
• CWRP Implementation Guidance | Scottish Forestry
• Woodfuel Advice Note | Ofgem
All proposals
Tree surveys are required for all developments where there are trees on
site, to inform design and mitigation taking into account the protection of
trees and avoidance of impacts on their ecological condition, through both
NPF4 and LDP2. This includes:
• Ancient and veteran trees
• Individual trees of high biodiversity interest
• Trees of high natural, historic and cultural heritage value, including
orchards
• Trees or groups of trees of high amenity value
• Trees in conservation areas
Woodland surveys may be required where identified through Preliminary
Ecological Appraisals or for potentially affected ancient woodland
categories including LEPO. See PKC’s Planning for Nature Annex 1 for
advice on tree and woodland surveys.
Proposals must then demonstrate how construction of installations and
tracks will avoid adverse impacts, fragmentation and loss of hedgerows,
woodland and trees in accordance with the mitigation hierarchy. LDP2 sets
out that tree removal is only permitted where unavoidable. NPF4 sets out
that woodland loss is only supported in accordance with the policy on
woodland removal. All loss must be restored or compensated in line with
PKC and national guidance.
Proposals should also seek to expand and enhance connectivity between
areas of natural and ancient woodland. Proposals affecting forestry should

Page 35

Renewable and Low Carbon Energy Guidance          33 
adhere to SEPA and Scottish Forestry standards and guidance, and the
Council’s Forest and Woodland Strategy.
Wind
In non-native plantation forestry, restructuring for wind optimisation may
be supported if SEPA guidelines are followed subject to impacts on soil,
biodiversity and timber production. Keyholing is preferred, except on peat
where clear felling and peat restoration should be pursued.
Hydro
Particular care should be taken with hydro schemes to avoid loss of, and to
enhance, riparian woodland. Impacts on land capable for timber
production should be minimised.
Solar
Sites for solar farms are expected to avoid trees, hedges and woodland,
and an appropriate buffer should be applied between site fencing and
surrounding woodland to protect roots and provide a maintenance
corridor. Native hedges with hedge trees are encouraged as enhancement.
Bioenergy
Unsustainable biomass fuel can impact GHG emission savings and
habitats. See section 2.7 for guidance on sustainable fuel sources. 
Fuel sustainability can be demonstrated by providing a management plan,
long term forestry plan, or meeting Ofgem sustainability criteria.
3.13 Hazardous Installations
Key Policies: 
• LDP Policy 33A(a): Renewable Energy
• NPF4 Policy 23: Health and Safety
Key Guidance:
• Developers’ planning application advice | HSE
• Grid Scale BESS planning Guidance for FRS | NFCC
• Guidance for Pollution Prevention: major spillages and firewater |
NIEA / SEPA
All Proposals
Site searches should address pipeline and HSE consultation zones set out
in LDP2 and where applicable set out mitigation as required to accord with
NPF4 Policy 23.  
Energy Storage
Applicants must address the associated risks with battery storage. Fires
are rare but may produce toxic gases and chemical run-off into soils and
waterways. Applicants should carry out a site specific risk assessment and
develop a robust risk management plan and emergency response plan.
Proposals must address matters contained in NFCC guidance including: 
• Fault, fire and gas detection and monitoring
• Water based fire suppression systems.
• Deflagration venting and explosion protection
• Two access points and tracks suitable for fire service vehicles
including passing places with no overhead obstructions
• 6 metres between units unless tests demonstrate a safe smaller gap
• 30m separation to occupied buildings subject to mitigation
• 10m separation from combustible material 
• Suitable water provision within 90m of the site or tanks that can
provide 1500L/min for 2 hours (180,000L). 
• Impervious surface
• Sufficient storage e.g. tanks, bunded lagoons, for run off from
firewater as demonstrated in a firewater management plan. This
may need to be for a greater volume than the water provision. 10m
separation between BESS units and water tanks. 
Submissions should provide a plan showing sensitive receptors within 1km
of the site.

Page 36

Renewable and Low Carbon Energy Guidance          34 
3.14 Construction Impacts
Key Policies:
• NPF4 Policy 11: Energy
• LDP2 Policy 33A(e): Renewable and Low Carbon Energy
Key Guidance
• Good practice guide for contractors | NatureScot
• Good Practice during windfarm construction | NatureScot
• Hydropower | SEPA
• Guide to hydropower construction good practice | SEPA
• Appendix 2: CMS Template
All Proposals
Construction best practice must be followed and consideration given to all
temporary and permanent infrastructure including hill tracks and borrow
pits, staff and storage compounds, crane pads, weirs, penstock and
cable/pipework routes, excavations and bunding.
Guidance on best practice construction methods and approaches is also
included under separate chapters, where relevant.
A draft Construction Method Statement (CMS) will be required as part of a
submission or an EIA Report:
• Where there is potential for impacts on the water environment, good
quality soils, carbon rich soils, priority habitats, or archaeology
• Where there is potential for impacts on a site designated for its
natural heritage such as SSSIs, SPAs and SACs.
• For all large turbines and wind farms
• For all hydropower
• For all major and EIA proposals
Most renewable energy projects will require a Construction Environmental
Management Plan (CEMP) by condition. A draft CEMP may also be
requested at the planning stage to inform proposals in sensitive
environments. A full CEMP will be required before construction, and the
advice of an independent Ecological Clerk of Works (ECOW) as agreed by
the Council, in consultation with NatureScot and SEPA where relevant. 
3.15 Soils
Key Policies:
• NPF4 Policy 5: Soils
• LDP2 Policy 33: Renewable and Low Carbon Energy
• LDP2 Policy 51: Soils
Key Guidance
• Soil | SEPA
• SEPA Position Statement on Planning and Soils
• Soil carbon management | NatureScot
3.15.1 All Soils
Soils provide a wide range of services from carbon storage to food growing.
Erosion, compaction, disturbance and loss can impact habitats and
waterways and negate Greenhouse Gas (GHG) reductions. Many of these
effects can be avoided, minimised and mitigated through good practice
construction and management. 
NPF4 Policy 5(a) only supports proposals where they are designed and
constructed in accordance with the mitigation hierarchy and in a manner
that protects soil from damage including from compaction and erosion,
and that minimises soil sealing. 
Soils stripped onsite should be minimised and stored for post-construction
restoration which should be appropriate to the surrounding environment.
Restoration should take place as soon as tracks or areas are completed or
no longer required and aim to enhance soils and vegetation and prevent
further erosion.
Impacts on soils and peatland considered should include all aspects of the
development including any borrow pits, tracks, and areas required during
construction. 
Construction of tracks, cable and pipeline routes particularly on the steep
ground typical of hydropower, can lead to erosion which can be
exacerbated by changes in drainage patterns. Drainage strategies should
demonstrate that erosion is not exacerbated by changes in hydrology

Page 37

Renewable and Low Carbon Energy Guidance          35 
through direct erosion or drying out. In areas likely to be prone to erosion,
applications should avoid disturbance of trees and vegetation. Where
unavoidable, measures to safeguard soils during construction, and
planting of natural protection during restoration should be provided.
Solar applications can minimise erosion through careful site selection,
avoiding steep slopes and maintaining vegetation. Using driven, screw or
floating mounts can minimise soil impacts.
See section 2.7 for guidance on bioenergy feedstocks to protect soils.
3.15.2 Prime Agricultural Land and Good Quality Soils
NPF4 Glossary defines prime agricultural land as that identified as being
Class 1, 2 or 3.1 in the land capability classification for agriculture
developed by Macaulay Land Use Research Institute (now James Hutton
Institute). LDP2 Policy 51 includes this land and classes 1-3.2 as Good
Quality Soils
Submissions must refer to the 1:50K Scale Land Capability Map in the first
instance and only the National Scale Land Capability map where 1:50k is
not available. 
NPF4 Policy 5(b) sets out three qualifications for renewable energy which
will be supported on these soil types; all of which must be demonstrated in
submissions:
• there is a specific locational need and there is no other suitable site
• there is secure provision for restoration; and
• the layout and design of the proposal minimises the amount of
protected land that is available.
Submissions should set out the operational reasons why a site is required
over sites of a lower grade classification within a site search appropriate to
the technology. Site searches must set out each area investigated, and the
reasons why the alternative site was not considered suitable.
Submissions should ensure designs demonstrate that restoration of land
to its previous use is feasible following decommissioning. Note that the
temporary nature of an installation is expected except for wind energy
where proposals must be suitable in perpetuity.
Submissions should clearly set out how the design minimises the use of
prime agricultural land, in accordance with the mitigation hierarchy
including decisions taken to reduce the footprint. 
LDP2 Policy 51: Soils requires development on all Good Quality Soils to:
• Minimise impacts
• Implement appropriate soil management 
• Adopt best practice when moving, storing and reinstating soils
• Consider opportunities to re-use soils necessarily excavated 
This information should be set out in a draft Soil Management Plan with
submissions.
The cumulative loss of prime agricultural land is an important
consideration. Major and EIA proposals must set out the cumulative loss of
prime agricultural land including consented and submitted proposals
under consideration. This should show:
• The loss of land in hectares
• The loss of prime land as a % of each affected soil class of prime
agricultural land within:  
o the local area and
o Perth and Kinross as a whole
Wind
The loss of any prime agricultural land will be appraised as a permanent
loss of land so should be minimised through careful layout and design and
continued use as productive land as far as possible. 
Solar 
Large solar farms can require a large land area and are often proposed in
lowland areas where prime agricultural land is typically located. Proposals
must not lead to an unacceptable cumulative loss of prime land and
proposals should maximise continued productive use of the land beneath
panels. 
Energy Storage & Enabling Infrastructure
Battery storage and substation developments typically have specific
locational requirements in terms of proximity to existing/planned

Page 38

Renewable and Low Carbon Energy Guidance          36 
infrastructure. Site searches for Energy Storage must extend at least 3km
from the substation where need is identified.
3.15.3 Carbon Rich Soils, Peatland and Priority Peatland
Habitat
• Carbon and Peatland Map | NatureScot
• Restoring Scotland's Peatlands | NatureScot
• Advising on peatland, carbon-rich soils and priority peatland
habitats in development management | NatureScot
• Waste position statement for developments on peat | SEPA
• Development on peatland guidance – waste | SEPA
• Assessment the impact on peatland and carbon rich soils
(forthcoming) | SEPA
• Developments on peatland: Site surveys | Scottish Government
• Floating roads on peat | SNH & FCS
• Guidance on the assessment of peat volumes, reuse of excavated
peat and minimisation of waste
NPF4 Glossary sets out the definition of:
• Peatland
• Carbon rich soils
• Priority peatland habitat
Note that developments on peatland and priority peatland must also
comply with policy 3(b) and 3(c) Biodiversity.
NPF4 Policy 5(c) sets out two qualifications for renewable energy which will
be supported on these soil types; both must be demonstrated in
submissions:
• Essential infrastructure must demonstrate a specific locational
need and that there is no other suitable site.
• Renewable energy must optimise the contribution of the area to
GHG emissions targets. 
Development on these soils types must be accompanied by:
• a site specific assessment as set out in NPF Policy 5(d); 
• a peat management plan setting out how the assessment has
informed the projects application of the mitigation hierarchy
• plans for restoration and enhancement and associated studies and
plans. Proposals on peatland are expected to provide
compensatory restoration for damaged peatland in line with
NatureScot guidance which requires  a 1:10 ratio. 
The mitigation hierarchy requires:
• Avoidance and minimisation of impacts through site selection, route
and design with buffers between infrastructure and carbon soils.
• Minimising unavoidable impacts by minimising the footprint of
compounds and tracks and using floating roads or alternative
delivery mechanisms. 
• Restoring disturbed peatland and restoring and enhancing peatland
in the wider area as compensation.
Wind
Turbine foundation excavations and the large footprint of wind farms can
impact across a large area of peatland, carbon rich soils, and priority
peatland habitat, through direct loss as well as indirect impacts on
drainage and water flows. Information required for developments on peat is
included in SEPA windfarm guidance.
Hydro
Changes to water flows and drainage, and construction of track and
penstock routes, can disturb or drain peatland and carbon rich soils,
leading to impacts on the water environment, the loss of rare habitats and
any GHG emission savings. 
Submissions should ensure changes to watercourses do not impact on
peatland viability, directly or indirectly.
Solar
Solar farms may impact these soils through changes to water flow from
panels, trenches, drainage and tracks and they should be avoided through
site selection unless impacts can be avoided through design.
Battery Storage, Bioenergy & Enabling Infrastructure

Page 39

Renewable and Low Carbon Energy Guidance          37 
Large-scale battery storage, substations and bioenergy proposals can have
sizeable footprints leading to direct loss as well as indirect impacts of
hardstanding and tracks on drainage and water flows. Proposals are
expected to minimise hardstanding on these soils. Cross-boundary
Impacts
Key Policies
• NPF4 Policy 11e
• LDP2 Policy 33
Key Guidance:
• Loch Lomond & Trossachs National Park - Planning
• Cairngorms National Park - Planning
3.16 Cross Boundary Applications 
Proposals may have effects across neighbouring planning authority
boundaries particularly with regards to Roads and Transport, Landscape
and Visual Impacts, and Biodiversity. Applicants should consider the plans
and policies of these authorities, and they will be consulted where there
may be an effect. 
Cumulative assessments should include applications and installations
within other planning authorities’ boundaries where there is a
landscape/visual, transport, or ecological connection.
National Parks 
Part of Perth and Kinross is in Loch Lomond & The Trossachs National Park.
Proposals here are made to the National Park Authority (NPA) in line with
their LDP. 
In the Cairngorms National Park, proposals are made in line with the
Cairngorms LDP and submitted to Perth & Kinross Council for
determination. The Cairngorms NPA may then opt to ‘call in’ and determine
the application.

Page 40

Renewable and Low Carbon Energy Guidance          38 
3.17 Decommissioning & Restoration
Key Policies
• NPF4 Policy 11(e)
• LDP2 Policy 33
Key Guidance
• Life Extension and Decommissioning of onshore wind farms | SEPA
• Decommissioning and Restoration Plans for wind farms |
NatureScot 
• Batteries | SEPA
• Waste Batteries and Accumulators Regulations 2009
All proposals
NPF4 Policy 11(e) paragraphs (xi) and (xii) require all proposals to show how
the following considerations are addressed:
• proposals for the decommissioning of developments, including
ancillary infrastructure, and site restoration
• the quality of site restoration plans including the measures in place
to safeguard or guarantee availability of finances to effectively
implement those plans
Decommissioning should be considered when designing and choosing
components of all renewable developments. Electronics should be
recycled in accordance with the Waste Electrical and Electronic
Equipment Regulations 2013.
Restoration can involve works both post-construction as well as post-
operation of the development. Restoration requirements are relevant
across a range of planning considerations and have been included under
the relevant section. In line with NPF4 Policy 11(e), the Council will seek
appropriate measures, including restoration bonds or other appropriate
financial mechanism, are included as part of any permission, where
relevant. 
Submissions for all EIA and major installations, or proposals potentially
affecting sensitive environments including peatland and the water
environment should include a draft Decommissioning and Restoration Plan
(DRP). A full updated DRP will need to be agreed with the Planning
Authority and consultees prior to decommissioning. 
A draft DRP should contain:
• Proposed timing, options, associated impacts and mitigation
particularly regarding impacts on habitats, peat, the water
environment and transport
• Reuse and recycling options
• Proposals for restoration of borrow pits and tracks
• Proposals for habitat, agricultural land, peatland and/or recreation
enhancement
• Provisional, index linked, costs for restoration
A Decommissioning Method Statement demonstrates how
decommissioning will take place while protecting the environment and
should include:
• Proposed timing, options, associated impacts and mitigation
associated with removal of in-ground and in-water infrastructure.
• How materials will be reused or recycled in compliance with the
waste regulatory framework
• How potential contaminants will be safely disposed of including
heat pump units and heat transfer fluid, AD waste
• Measures to ensure no contamination of soils or the water
environment
• Timing and method of restoration and enhancement, particularly of
habitat and agricultural land, waterways and riparian habitat.
• Proposed restoration monitoring and aftercare
Wind
As noted under NPF4 Policy 11(f), wind farms are expected to be suitable
for use in perpetuity. Decommissioning will be required at the end of the
permission period or where operation ceases and should be considered at
design stage. 
Removal of all infrastructure will be required unless the adverse impacts of
removal are shown to outweigh the benefits, such as wind turbine bases
below ground.

Page 41

Renewable and Low Carbon Energy Guidance          39 
Hydro
Hydropower schemes will need to be decommissioned once they are
deemed to have ceased operation. Decommissioning of above ground and
in-water infrastructure and associated restoration must be considered at
design stage. 
Solar
Decommissioning will be required as a condition for all installations at the
end of the permission period, based on the expected life of the technology,
or once operation has ceased. Removal of all infrastructure will be required
unless outweighed by adverse impacts.
The design of roof mounted, and small ground-mounted installations
should ensure decommissioning can be carried out with minimal impacts
particularly in historic environments. 
Energy Storage, Bioenergy, Enabling Infrastructure
Decommissioning will be required as a condition for energy storage at the
end of the permission period, based on the expected life of the technology,
and for all installations once operation has ceased. Removal of all
infrastructure will be required unless outweighed by adverse impacts.
Batteries must be sent for recycling to an approved battery treatment
operator or exporter. 
A financial mechanism may be required by legal agreement to ensure
decommissioning and restoration can be undertaken.
3.18 Renewable Energy Generation and Greenhouse
Gas Emissions Reduction Targets
Key Policies:
• NPF4 Policy 1: Tackling the climate and nature crises
• NPF4 Policy 2: Climate mitigation and adaption
• NPF4 Policy 11(e): Energy
• NPF4 Policy 5(d)(iii): Soils
• LDP2 Policy 33A (b): Renewable and Low Carbon Energy
Key Guidance
• Draft Bioenergy Policy Statement | Scottish Government
• Assessing Greenhouse Gas Emissions and Evaluating Their
Significance | IEMA
• Carbon Calculator for Wind Farms on Scottish Peatlands |
ClimateXChange
All proposals
In considering the assessment of proposals against NPF4 Policy 11(e),
significant weight will be placed on the contribution towards:
• renewable energy generation targets, and
• greenhouse gas emissions (GHG) reduction targets
Proposals should include information detailing the contribution(s) of the
proposed development towards UK and Scottish Government targets for
renewable energy generation and GHG reductions. 
The contribution of proposals to renewable energy targets should be
presented using the following information, where relevant:
• Electrical or heat generation capacity (kWh/MW)
• Expected annual generation (kWh/MWh)
• Equivalent number of homes powered or heated
• Fuel used and source (where relevant)
• Fuel and/or generation technology being replaced or displaced
LDP2 Policy 2(a) requires that:
“ Development proposals will be sited and designed to minimise lifecycle
greenhouse gas emissions as far as possible„
EIA Development must provide a Greenhouse Gas Emissions Assessment
in accordance with IEMA guidance. 
Major proposals must present a proportionate assessment of lifetime
carbon emissions including embedded carbon, transport and soil loss and
describe the steps taken to minimise emissions. This will be taken into
account alongside GHG reductions of the technology.

Page 42

Renewable and Low Carbon Energy Guidance          40 
All proposals on peatland and carbon rich soils must carry out an
assessment of the likely net effects of the development on climate
emissions and loss of carbon. 
Bioenergy proposals must demonstrate adherence to greenhouse gas and
land sustainability criteria for feedstocks to be considered low carbon as
set out in Section 2.7. 
3.19 Grid Capacity
Key Policies:
• NPF4 Policy 11e
• LDP2 Policy 33 (Renewable and Low Carbon Energy)
• LDP2 Policy 35 (Electricity Transmission Infrastructure)
Key Guidance
• Network Capacity Information - SSEN
• SSEN Network Maps
All proposals
NPF4 Policy 11e states that grid capacity should not constrain renewable
energy development and it is for developers to agree connections to the
grid with the relevant network operator. For the PKC area, this is SSEN.
For proposals involving grid infrastructure, underground connections
should be considered where possible. This will be informed by wider
considerations including landscape and visual impact, and potential
impact on, for example, natural heritage, biodiversity, peatland/carbon rich
soils/priority peatland habitat, prime land, and the historic environment.
Proposals for grid infrastructure including reconfigured, extended and/or
new substation infrastructure, should involve early engagement with
relevant stakeholders including the planning authority, key agencies, and
affected communities.
3.20 Cumulative Impacts
Key Policies
• NPF4 Policy 11e
• LDP2 Policy 33
Key Guidance
•  Assessing the cumulative landscape and visual impact of onshore
wind energy developments| NatureScot 
• Renewable Map | PKC
All Proposals
The impact of a technology may be exacerbated by existing, consented or
proposed installations in the area with a similar effect. An assessment of
the cumulative effects may be required for large applications and even
small applications in sensitive locations.
NPF4 Policy 11(e) requires proposals to demonstrate cumulative impacts
are addressed. The scale of infrastructure required to help meet the
national targets for renewable energy generation and GHG emissions
reduction is such that cumulative impacts will need to be carefully
considered to ensure developments are steered to the right locations and
of an appropriate design and scale.
Cumulative impacts are particularly relevant to: 
• landscape/visual amenity, 
• natural places
• biodiversity 
• peatland/carbon rich soils/priority peatland habitat
• prime agricultural land
• roads and transport
Proposals should address:
• Existing installations
• Submitted proposals
• Proposals with permission not yet implemented
• Proposals and installations in neighbouring planning authorities.
• Impacts from all industrial installations including energy storage,
substations and other grid infrastructure.
The cumulative search area will be defined by the nature and scale of the
proposal and impacts and is best discussed with PKC through pre-
application enquiries.

Page 43

Renewable and Low Carbon Energy Guidance          41 
See the relevant section for policy specific information.
3.21 Permission Lifetime and Extensions
Key Policies
• NPF4 Policy 11(f)
• LDP2 Policy 33B 
Key Guidance
• Life extension and decommissioning onshore windfarms | SEPA
3.21.1 Permission lifetime
NPF4 Policy 11(f) advises that consents for development proposals may be
time-limited. This includes wind farms, but wind power sites are expected
to be suitable for use in perpetuity.
Solar farms and most wind turbines will be time limited. Other proposals
will be required to carry out decommissioning once they cease operating.
Submissions should nevertheless identify the expected life-time of the
development. 
3.21.2 Life Extensions and Repowering
Both upgrading existing technology (repowering) and extending the life of
an existing installation planning permission (life extension) can maximise
resource availability. Repowering and extension applications will be treated
as new applications subject to the contemporary legal and policy
framework, but applications in suitable sites where impacts have been
shown to be capable of mitigation are encouraged, where submitted well
before the existing permission expires. The impacts of the existing
installation will be a material consideration including environmental or
operational issues, and results of monitoring. New environmental studies
may be required if monitoring is insufficient, and applicants are
encouraged to improve upon the existing site and review community
benefits and shared ownership.
Wind
Repowering can involve full or partial replacement of turbines at any time
during the life of the installation, and may involve fewer, larger turbines on a
larger footprint with potential for a significant change to landscape, visual
and other impacts. Additional considerations include:
• Changes to renewable target contribution and GHG payback
• Changes to and history of community support
• Effects on soils and the water environment through revised height,
footprint and layout
• Revised landscape and visual impacts due to changes in height,
rotor size and layout.
• Revised cumulative impacts
• Impacts on natural heritage and biodiversity including on successful
restoration and changes to habitats and wildlife
• Impacts from changes to, retention of or decommissioning of
infrastructure including tracks, crane pads and foundations
• Innovation that provides future flexibility, reuse and recycling
• Reuse of materials, tracks and cables
• Recycling of materials that cannot be reused
• Changes to restoration plans
Hydro
Hydropower permissions including PSH will not normally be time limited.
Any material alteration to hydropower installations is likely to require a
fresh application for planning permission particularly if an increase of the
size or height of the weir or dam is proposed. 
Alterations to a hydro scheme are also likely to require authorisation under
CAR so applicants should contact SEPA at an early stage.
Solar
Solar farms will be time-limited but life extension or repowering can
maximise resource availability. Proposals for repowering with material
change involving more or larger panels, trenching or cabling - will require a
new application. New permissions may include an option for life extension,
subject to approval and identified limitations including the
presence/availability of prime agricultural land.

Page 44

Renewable and Low Carbon Energy Guidance          42 
3.21.3 Geographical Extensions
Wind
Adding additional turbines to an existing wind farm will be treated as a new
application taking into account the existing wind farm and cumulative
impacts on the environment. Extensions should fit naturally with existing
turbines and layout. If the proposed extension is intended to outlast the
existing turbines, additional visualisations and impact assessments will be
required to address the impact of the extension on its own.
Solar
Adding additional panels to an existing solar installation may make the best
use of the available resource dependent upon the scale, nature and layout
of the existing/proposed scheme. Geographical extensions will be treated
as new applications taking into account the existing installation and
cumulative environment particularly with regard to soils and landscape
and visual effects. Extensions should aim to fit with, or improve on, the
existing panels and layout, and use as much of the existing infrastructure
as possible.

Page 45

Renewable and Low Carbon Energy Guidance          43 
4 Appendices
4.1 NPF4 and [LDP2] Policies
The following shows NPF4 Policy 11 alongside additional requirements in
[LDP2 Policy 33]. References to directly relevant (NPF4 Policies) and extant
[LDP2 Policies] are also highlighted. 
Policy 11
a) Development proposals for all forms of renewable, low-carbon and
zero emissions technologies will be supported. These include:
i. wind farms including repowering, extending, expanding and
extending the life of existing wind farms;
ii. enabling works, such as grid transmission and distribution
infrastructure;
iii. energy storage, such as battery storage and pumped storage hydro;
iv. small scale renewable energy generation technology;
v. solar arrays;
vi. proposals associated with negative emissions technologies and
carbon capture; and
vii. proposals including co-location of these technologies. [33A…
taking into account…(i) Opportunities for energy storage] 
b) Development proposals for wind farms in National Parks and National
Scenic Areas will not be supported.
c) Development proposals will only be supported where they maximise
net economic impact, including local and community socio-economic
benefits such as employment, associated business and supply chain
opportunities.
d) Development proposals that impact on international or national
designations will be assessed in relation to Policy 4.
(NPF4 Policy 4: Natural Places)
e) In addition, project design and mitigation will demonstrate how the
following impacts are addressed:
i. impacts on communities and individual dwellings, including,
residential amenity, visual impact, noise and shadow flicker;[air
quality…including impacts from construction]
ii. significant landscape and visual impacts, recognising that such
impacts are to be expected for some forms of renewable energy.
Where impacts are localised and/or appropriate design mitigation
has been applied, they will generally be considered to be
acceptable. [taking into account landscape character, Local
Landscape Areas, Wild Land Areas and other considerations in
LDP2 Policy 39 ]
(NPF4 Policy 4: Natural Places)
(NPF4 Policy 8: Greenbelt)
iii. public access, [recreation and tourism interests] including impact
on [core paths,] long distance walking and cycling routes and
scenic routes [including the A9 trunk road; and other established
routes for public walking, riding or cycling.]
iv. impacts on aviation and defence interests including seismological
recording;
v. impacts on telecommunications and broadcasting installations,
particularly ensuring that transmission links are not compromised;
vi. impacts on road traffic and on adjacent trunk roads, including
during construction;
vii. impacts on historic environment;
viii. effects on hydrology, the water environment and flood risk;
ix. biodiversity including impacts on birds [and natural heritage];
(NPF4 Policy 3; NPF4 Policy 4)
x. impacts on trees, woods and forests;
[LDP2 Policy 40](NPF4 Policy 6)
[33A: Proposals… will be supported subject to the following factors being
taken into account…]
• [(a)…hazardous installations (including pipelines)][and
[(e) Construction and service tracks and borrow pits associated with any
development]
[(f) Effects on soils including:

Page 46

Renewable and Low Carbon Energy Guidance          44 
• Carbon rich soils, deep peat and priority peatland habitats; or
• Prime agricultural land]
(NPF4 Policy 5)
[(j) Cross-boundary impacts including any impacts on the qualities of the
Cairngorms and Loch Lomond and the Trossachs National Parks]
xi. proposals for the decommissioning of developments, including
ancillary infrastructure, and site restoration; [Decommissioning
including any conditions/bonds considered necessary for site
restoration] [Policy 33C: Decommissioning and Restoration of
Existing Facilities: In cases where the permission expires or the
project ceases to operate for a specific period, the removal of the
development and associated equipment and the restoration of the
site will be required to a standard agreed with the Council…] 
xii. the quality of site restoration plans including the measures in place
to safeguard or guarantee availability of finances to effectively
implement those plans; [Appropriate financial bonds or other
financial mechanism(s) for site restoration may be required]; and
xiii. cumulative impacts.[and…]
In considering these impacts, significant weight will be placed on the
contribution of the proposal to renewable energy generation targets and on
greenhouse gas emissions reduction targets.
Grid capacity should not constrain renewable energy development. It is for
developers to agree connections to the grid with the relevant network
operator. In the case of proposals for grid infrastructure, consideration
should be given to underground connections where possible.
f) Consents for development proposals may be time-limited. Areas
identified for wind farms are, however, expected to be suitable for use
in perpetuity.
[Policy 33B: Repowering and Extending Existing Facilities]
[As a result of the potential to make the best use of existing sites and
through the continued use of established infrastructure such as grid
connections, proposals for the repowering (including life extensions) of
existing renewable and low-carbon energy facilities will be encouraged,
subject to detailed assessment against the same factors and material
considerations as apply to proposals for new facilities. The current use of
the site will be a material consideration in any such proposals.
Geographical extension of existing facilities will also be assessed against
criteria (a) to (j) above and any other material considerations [including
NPF4 Policy 11], with particular emphasis on any potential cumulative
impacts arising as a result of the proposed development. Further guidance
on the key considerations when dealing with proposals for repowering and
extending existing facilities will be provided in Supplementary Guidance to
this Policy.]

Page 47

Renewable and Low Carbon Energy Guidance          45 
4.2 Construction Method Statement Template
What are the environmental/ecological risks and where are they?
All areas of risk to ecology, the water and built environment must be
considered.
• Provide a plan of the site, clearly showing the areas of potential pollution.
These should be highlighted and numbered, with a simple key.  An
example of this is provided, for guidance.  
• All sensitive habitat should be considered and mitigated.
Who is aware of these risks?
All on-site staff must be made aware that pollution has to be prevented and
ecological impact mitigated.
• Indicate how everyone is made aware of this requirement e.g. in
induction, clearly displayed CMS, as part of daily monitoring checks,
signed information sheet and site diary. 
What can be done to prevent pollution/harm?
Mitigation measures appropriate to prevent pollution have to be considered
and must be routinely monitored and replaced where required. 
• Using individual numbers from the site map above, indicate exactly what
mitigation measures will be used to prevent siltation, run-off and oil spills
etc.
• Clearly defined, robust Construction Exclusion Zones. 
What will you do if the mitigation fails?
There will be circumstances where mitigation measures e.g. overloaded silt
curtains are in need of repair and replacement. A thorough monitoring regime
and adequate replacement kits must be in place.
• Detail what spill kits etc. will be available and where these will be located.
These should be marked on the map.
Who will you contact?
The appropriate authorities and water users will have to be made aware of
environmental incidents as they occur.
• List the names and contact numbers of the interested parties who you will
contact in the case of emergency.

Page 48

Renewable and Low Carbon Energy Guidance          46