Democracy Spraffa

Agenda Document Pack - Economy and Infrastructure Committee - 28/05/2025

Perth and Kinross Council · 28 May 2025
Back to Economy and Infrastructure Committee — 28 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Ambition | Compassion | Integrity 
Our vision is for 
a Perth and Kinross where everyone can live life
well, free from poverty and inequality 
Council Building
2 High Street
Perth
PH1 5PH 
21/05/2025 
A hybrid meeting of the Economy and Infrastructure Committee will be held in the
Council Chamber on Wednesday, 28 May 2025 at 09:30. 
If you have any queries please contact Democratic Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are silent
on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The recording
will be publicly available on the Council’s website following the meeting. 
Members:
Councillor Eric Drysdale  (Convener)
Councillor Jack Welch  (Vice-Convener)
Councillor Hugh Anderson
Bailie Rhona Brock
Councillor Steven Carr
Councillor Stewart Donaldson
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Councillor Grant Laing
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Councillor Alan Watt
Page 1 of 146

Page 2

Page 2 of 146

Page 3

Economy and Infrastructure Committee 
Wednesday, 28 May 2025 
Agenda 
Members are reminded of their obligation to declare any financial or non-
financial interest which they may have in any item on this agenda in
accordance with the councillors’ code of conduct. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE ECONOMY AND
INFRASTRUCTURE COMMITTEE OF 5 FEBRUARY 2025 FOR
APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT    9 - 10 
5 LDP3 - DEVELOPMENT PLAN SCHEME
Report by Strategy Lead - Economy, Development and Planning
(copy herewith 25/128) 
11 - 60 
6 PERTH AND KINROSS TOURISM STRATEGY AND ACTION
PLAN 2025-2030
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 25/129) 
61 - 84 
7 REVIEW OF PERTH HARBOUR OPERATIONS TO SUPPORT
'HARBOUR QUARTER' AND INNER RIVER TAY
DEVELOPMENTS
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 25/130) 
85 - 104 
8 SCHOOL EXCLUSION ZONE UPDATE
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 25/131) 
105 - 118 
9 ACTIVE TRAVEL PRIORITISATION DELIVERY REPORT
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 25/132) 
119 - 146 
Page 3 of 146

Page 4

Page 4 of 146

Page 5

Economy and Infrastructure Committee 
Minute of hybrid meeting of the Economy and Infrastructure Committee held in the
Council Chambers on Monday 21 October 2024 at 10.00am. 
Present: Bailie R Brock, Councillors H Anderson, B Brawn (substituting for Councillor
F Smith), S Donaldson, J Duff, A Forbes, K Harvey, N Khogali, G Laing, I Massie
(substituting for Councillor S Carr), W Robertson (from Item 4 onwards), C Stewart
and A Watt. 
In Attendance: C Mailer, Depute Chief Executive; D Littlejohn, Strategic Lead –
Economy, Development and Planning; S Merone, Strategic Lead – Economy,
Development and Planning; S MacDonald, A Seggie (up to and including Item 5),
K Easton, S Cumiskey and G Pinfield (all Economy, Place and Learning); R Haynes
(Environment and Infrastructure) (up to and including Item 4); A Taylor, S Hendry,
A Brown and M Pasternak (all Legal and Governance). 
Apologies: Councillors S Carr and F Smith. 
Councillor E Drysdale, Convener, Presiding. 
1. Welcome and Apologies 
Convener welcomed everyone to the meeting.  Apologies for absence were
noted as above. 
2. Declarations of Interest 
There were no Declarations of Interests in terms of the Councillors’ Code of
Conduct. 
3. Minute of Meeting of Economy and Infrastructure Committee of
21 October 2024 
The minute of the meeting of the Economy and Infrastructure Committee of
21 October 2024 was submitted and approved as a correct record. 
Prior to the commencement of the formal business on the agenda: 
A1. Convener’s Statement – Enva, Shore Terrace, Perth – Fire 
The Convener referred to the most recent fire at the Enva Waste Management
site on Shore Terrace, Perth and the subsequent impact on the Friarton Road Bridge
and to local residents.  He advised that he would be inviting representatives of the
site operators Enva, along with lead agencies SEPA, the Health and Safety
Executive, Transport Scotland, Scottish Fire and Rescue Service and Police
Scotland to meet with the Leader of the Council, local parliamentarians and himself
as soon as possible to seek assurances and to understand what action can and will
be taken to prevent such incidents from recurring and to ensure effective
collaboration across all agencies.  He further committed to keep members of the
3
Page 5 of 146

Page 6

public, this Committee and ward Councillors informed of the outcomes of the
discussions. 
4. Outstanding Business Statement 
S Merone, Strategic Lead – Economy, Development and Planning provided a
comprehensive update on the work that is currently underway with regards to
Conservation Areas.  He advised that there were currently four appraisals being
carried out (Spittalfield, Meiklour, Birnam and Dunkeld). 
Resolved:
The status of actions in the Outstanding Business Statement (25/26) be noted
and completed actions removed accordingly. 
5. Tay Cities Prospectus for Regional Growth (2025-2035) and Perth and
Kinross Economic Action Plan (2025-2030) 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (25/27) (1) providing information on the Tay Cities Prospectus for
Regional Growth (2025-2035); and (2) seeking endorsement of the draft Perth and
Kinross Economic Action Plan (2025-2030) developed by the Perth and Kinross
Economic Partnership prior to it going out for public consultation. 
Resolved:
(i) The Tay Cities Prospectus for Regional Growth be noted.
(ii) The draft Perth and Kinross Economic Action Plan developed by Perth and
Kinross Economic Partnership be endorsed.
(iii) It be noted that the Strategic Lead - Economy, Development and Planning will
carry out a public consultation on behalf of Perth and Kinross Economic
Partnership, and following consultation, finalise the Action Plan with Perth and
Kinross Economic Partnership for delivery from 1 April 2025.
(iv) Officers be instructed to bring back annual progress reports to this Committee
for consideration. 
(There followed a short recess and the meeting reconvened at 11.45am.) 
6. Perth and Kinross Visitor Levy 
There was submitted a report by the Strategic Lead – Housing and
Communities (25/28) (1) providing details on how the Visitor Levy (Scotland) Act
2024 and the powers granted to local authorities could be applied within Perth and
Kinross, and the process for considering this; and (2) seeking approval to commence
early engagement on a potential visitor levy scheme for Perth and Kinross,
recognising the importance of tourism on the local economy and the need for
engagement with interested parties. 
Resolved:
(i) The approach and timeline for early engagement on a potential visitor levy
scheme for Perth and Kinross, as set out in Section 4.6 to Report 24/28, be
approved.
Page 6 of 146

Page 7

(ii) The Strategic Lead - Economy, Development and Planning be instructed to
report back on the results of that early engagement and produce a draft Perth
and Kinross Visitor Levy Scheme to Council in December 2025, for a decision
on whether to proceed to formal consultation or not. 
7. Valedictory – David Littlejohn 
The Convener and Elected Members paid tribute and passed on their best
wishes for the future to David Littlejohn, Strategic Lead – Economy, Development
and Planning who was retiring at the end of February after fourteen years with the
Council.
Page 7 of 146

Page 8

Page 8 of 146

Page 9

ECONOMY & INFRASTRUCTURE COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 25/127) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
18. 28 August
2024
Item 5
Road Gully
Cleansing
Investigate technical
feasibility of
publicising gully
cleansing and
monitoring data,
schedules and
performance. 
A new interactive map
showing when gullies in
Perth and Kinross have
been cleansed is now
available on the Perth
and Kinross Council
website Map of gully
maintenance schedule -
Perth & Kinross
Council. Data used to
populate the map
stretches back to April
2023. More gullies will
be added as more are
cleaned or repaired as
part of the gully
maintenance
programme. 
Strategic Lead –
Environment and
Infrastructure
COMPLETE April 2025
20. 5 February
2025
Convener’s
Statement – ENVA
Commitment to
provide a detailed
update following any
meeting taking place
with relevant
authorities.
Detailed update
provided via media
outlets on 22 February
2025.
N/A COMPLETE 28 May 2025
4
Page 9 of 146

Page 10

No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
21. 5 February
2025
Item 4
Tay Cities
Prospectus for
Regional Growth
(2025-2035) and
Perth and Kinross
Economic Action
Plan (2025-2030) 
Provide a response to
Councillor Robertson
and Members on the
progress being made
in tackling issues with
a low wage economy.
Email attaching a
Briefing Note on
‘Wages in P&K’ sent to
Councillor Robertson
and all Committee
Members on 27 March
2025.
Alison Seggie COMPLETE 28 May 2025
22. 5 February
2025
Item 4
Tay Cities
Prospectus for
Regional Growth
(2025-2035) and
Perth and Kinross
Economic Action
Plan (2025-2030) 
Investigate and
provide clarity to
Councillor Duff and
Members on the
infographic detailed
on Page 46 of Report
25/27) specifically on
the figure of 9.3% of
households in ‘urban
adversity’ and
whether there was an
equivalent measure of
households in rural
adversity. 
Email providing clarity
sent to Councillor Duff
and all Committee
Members on 5 March
2025. 
Alison Seggie COMPLETE 28 May 2025
Page 10 of 146

Page 11

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure Committee 
Date of Meeting: 28 May 2025 
Report Title: LDP3 Development Plan Scheme 
Report Number: 25/128 
Report Author: Brenda Murray, Local Development Plan Team
Leader 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 This report seeks approval for the updated statutory Development Plan
Scheme (DPS) which proposes a revised timetable for the preparation of the
next Perth and Kinross Local Development Plan (LDP3). The last update was
approved by the Economy and Infrastructure Committee on 21 October 2024
(report 24/284 refers). It also highlights the recent addendum prepared in
relation to the LDP2 Delivery Programme for noting. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6 Conclusion
7. Impact and Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 agrees the updated Perth & Kinross Council Development Plan Scheme 
2.2 authorises the Strategic Lead – Economy, Development and Planning to
submit the Scheme to the Scottish Ministers; 
5
Page 11 of 146

Page 12

2.3 notes the publication of the addendum to the Delivery Programme for LDP2 
3. Background/Context 
3.1  A Development Plan Scheme is a document setting out a planning authority’s
programme for preparing and reviewing their Local Development Plan (LDP).
The Planning Authority is required to update its Development Plan Scheme at
least annually. The last update was approved by the Economy and
Infrastructure Committee on 21 October 2024 (report 24/284 refers). 
3.2 Since publishing the Development Plan Scheme a significant milestone has
been reached with the approval of the Evidence Report for LDP3 by Council
in March of this year. Following approval, the Evidence Report was submitted
to Scottish Ministers on 27 March 2025 for the Gate Check review and on 9
April 2025 Scottish Ministers appointed Stephen Hall BA(Hons) BPI MRTPI to
consider whether the Evidence Report contains sufficient information to
enable the Council to prepare LDP 3. 
3.3 Following submission of the Evidence Report, it was considered prudent to
revisit the timetable for the remainder of the plan preparation process. The
timetable is a best estimate of when the various stages of the plan making
process will be reached and, on that basis, is indicative and should be subject
to regular review. The Development Plan Scheme must detail, by financial
quarters, when various parts of the Local Development Plan will be produced,
and if there are any changes to the timetable then those changes are
legislatively required to be detailed in future Development Plan Schemes
alongside the reasons why the timetable has been changed. 
3.4 Stepping back to LDP2, and its Delivery Programme was last updated in
February 2024. Since then, there has been a specific requirement from
Scottish Ministers for delivery programmes to include the ‘sequencing of, and
timescale for, the delivery of housing sites allocated in local development
plans’ (Chief Planner Letter – June 2024). An addendum to the LDP2 Delivery
Programme (Appendix 3) has therefore been prepared to establish a housing
land pipeline for the delivery of housing sites allocated in LDP2. The
addendum does not alter the content of the Delivery Programme but provides
the existing information in a format prescribed by the Scottish Ministers. It is
included within this report for noting purposes only. 
4. Main Issues 
4.1 On reviewing the timetable and considering the tasks to be undertaken during
the following stages in the process, it is considered that more time is required
to prepare the Proposed Plan, and that the following stages to adoption will be
quicker than anticipated in the current Development Plan Scheme. 
4.2 The overall timeframe as it currently stands in the Development Plan Scheme
2024 (Appendix 1 pages 4-5) remains unchanged with adoption of LDP3 late
2027. 
Page 12 of 146

Page 13

5. Proposals 
5.1 There is a significant amount of work to be undertaken to prepare the
Proposed Plan including: ‘Call for Sites’; Locality Profiles; Urban Capacity
Study; Green Belt Review; identifying Nature Networks; site assessments;
Transport Appraisal; identifying 20-minute neighbourhoods; developing local
policy and place proposals; Strategic Environmental Assessment; and
preparation of the Plans Delivery Programme. 
5.2 Many of the tasks will require collaboration with stakeholders not just
internally across Council Services to reflect the corporate role of the plan, but
externally with key agencies, communities, infrastructure providers, the
development industry and landowners. 
5.3 By taking the time to encourage engagement and work collaboratively
throughout plan preparation, this should deliver a plan which meets with
greater consensus and fewer representations when published for
consultation. The pathway for collaboration has already been established
through the early engagement on the Evidence Report by way of the Big
Place Conversation, Topic Paper Consultation and targeted engagement and
this will be built upon throughout preparation of the Proposed Plan. 
5.4 In addition, the assessment of the Evidence Report through the Gate Check
process should reduce the level of debate arising at the Examination at the
end of the plan preparation period. With this in mind, the timetable has been
revised to allocate more time to preparing the Proposed Plan and less time for
the period of examination to adoption. 
5.4 The updated Development Plan Scheme in Appendix 2 (pages 4 & 5) shifts
the balance of time across the LDP preparation timeframe to provide 21
months for Proposed Plan preparation (April 2025 - December 2026) and 12
months for the period of Proposed Plan consultation to adoption (January
2027 – December 2027), whilst still allowing some leeway for the current
Scottish Government deadline of May 2028 for an up-to-date LDP being in
place. 
6 Conclusion 
6.1 A review of the timetable for preparation of LDP3 has highlighted an
imbalance in the timescales afforded to the remaining stages of plan
preparation. The significant workload and requirement for collaborative
preparation necessitates more time to be afforded to the Proposed Plan
preparation and less to the later stages of Examination and Adoption. The
date for adoption remains unchanged. 
7. Impact and Value Assessment 
https://www.pkc.gov.uk/media/53944/LDP3-Development-Plan-
Scheme/pdf/LDP3_Development_Plan_Scheme.pdf?m=1744812380233
Page 13 of 146

Page 14

8. Appendices 
8.1 Appendix 1 – Perth & Kinross Development Plan Scheme 2024 
8.2 Appendix 2 – Perth & Kinross Development Plan Scheme 2025 
8.3 Appendix 3 – Perth & Kinross Local Development Plan 2: Delivery
Programme 2019-2029 Addendum: 31 March 2025 Housing Land Pipeline 
Page 14 of 146

Page 15

rgr
PERTH & KINROSS
C O U N C IL
Perth and Kinross
DEVELOPMENT PLAN SCHEME
Programme for Local Development Plan 3: October 2024
5
Page 15 of 146

Page 16

Perth and Kinross DEVELOPMENT PLAN SCHEME October 2024 1
Development Plan Scheme
The Development Plan Scheme is a statement setting out Perth & Kinross Council’s timetable for the preparation of the next development plan.
Under statutory guidance, all planning authorities are required to publish annually a Development Plan Scheme. The Development Plan Scheme
will set out to include:
 an explanation of what the Local Development Plan is;
 a timetable for the preparation of the next plan, Local Development Plan 3;
 community engagement in the planning process and how relevant stakeholders, including residents of Perth and Kinross, can get involved.
OVERVIEW
Page 16 of 146

Page 17

Local Development Plan
The Scottish Government requires every planning authority to prepare development plans for their area. The Development Plan is at the
heart of the planning system setting out policies and proposals to guide the development, management and use of land. The Plan sets
out a vision and a framework for future development; addressing needs and opportunities in relation to housing, economy,
infrastructure, community facilities, safeguarding and enhancing environmental and landscape assets, the emerging needs of climate
change and achieving well designed places for the residents, communities and businesses of Perth and Kinross. To support the
preparation of the next Local Development Plan, there are a range of other plans and strategies that interlink with the LDP.
National Planning
Framework (NPF)
Community Plan &
Corporate Plan
Regional
Spatial
Strategy
Government
advice &
strategies
Local Housing Strategy Local Place Plans
The
Development Plan
National Planning Framework 4
Tayside Local Biodiversity
Action Plan
+
Local Development Plan
Strategies including
Forest & Woodland, Open
Space, Food Growing
Climate Change Strategy &
Action Plan
Mobility Strategy
Perth City Plan Planning Guidance
Perth and Kinross DEVELOPMENT PLAN SCHEME October 2024 2
Page 17 of 146

Page 18

National Planning
Framework 4 (NPF4) LDP3 Process
The Planning (Scotland) Act 2019 has introduced a
number of changes to the key steps for preparing a Local
Development Plan. Preparation of a new-style LDP will
include:
 Evidence gathering and early community and
stakeholder engagement leading to an Evidence Report.
 Submission of the Evidence Report to Scottish
Ministers for an independent Gate Check.
 Collaborative plan preparation, leading to publication of
the Proposed Plan for consultation.
 Submission of the Proposed Plan to Scottish Ministers
for an independent examination of outstanding issues.
 Adoption of the Local Development Plan
National Planning Framework 4 was adopted in February
2023 and forms part of the Development Plan. It covers
the period from its adoption to 2045 with 10 year reviews.
It is a long term strategy that plans for development and
investment in infrastructure; and identifies national
developments and other strategically important
opportunities in Scotland. The NPF contains both spatial
and thematic planning policies and sets out the national
policy position for land use planning. It will be used to
determine planning applications.
The New Plan: LDP3
Supporting assessmentsAlongside National Planning Framework 4, the Local
Development Plan (LDP3) will be the main document
which will influence future built development in Perth
and Kinross. As NPF4 contains planning policy, new
LDPs will be place-based documents with emphasis on
maps, site briefs and masterplans, with minimal policy
wording. The policies and proposals within the LDP are
to be focused on places and locations, while National
Planning Framework 4 will provide overarching thematic
policies for decision making.
There are several assessments that must be undertaken
to support the preparation of a new Local Development
Plan. They are an integral part of the plan-making
process and should inform, and be informed by, the plan
as it is being prepared. These include:
 Strategic Environmental Assessment (SEA)
 Public Sector Equality Duty Assessment
 Fairer Scotland Duty Assessment
 Habitats Regulations Appraisal
Perth and Kinross DEVELOPMENT PLAN SCHEME October 2024 3
Page 18 of 146

Page 19

LDP3 Timeline
The LDP3 Timeline opposite shows the timescales for each
stage of the plan making process. Key to note is the
extended timescale for preparation of the Evidence Report.
The previous Development Plan Scheme (November 2023)
anticipated that the Evidence Report would be published by
September 2024, however, it is now programmed for Q4
2025 (January - March).
This is in part due to the success of the early engagement
activities undertaken in the form of the Big Place
Conversation and consultation on policy themed Topic
Papers. These generated a significant level of responses,
necessitating a lengthier period than anticipated for
analysis, and inclusion where appropriate, within the
Evidence Report.
In addition, time has been added to review and learn from
recent decisions issued by the DPEA in relation to other
Planning Authorities’ Evidence Reports, and to pick up on
the matters raised and make sure points relevant to our
Evidence Report are addressed before submission.
Whilst the period for preparing the Evidence Report has
been extended by approximately six months, it then aims to
recover this time by shortening later stages of plan
production. This means that the intended adoption date for
the new Local Development Plan remains unchanged at
circa Q3 2027 (Oct-Dec 2027). The adoption date, whilst
not exact, remains likely to be late 2027.
Stage When
Evidence Report
Gather evidence 2022 – December 2024
Engage with public and groups on evidence  January 2023-December 2024
Finalise and Publish Evidence Report and SEA
Scoping Report
March 2025
Gatecheck
Examination of the Evidence Report April – June 2025* 
Proposed Plan
Call for Ideas and Sites April – May 2025
Prepare Proposed Plan, Delivery Programme April – December 2025
Prepare Equalities Impact Assessment, Public
Sector Equality Duty Assessment, Fairer Scotland
Duty Assessment and Habitat Regulations Appraisal
April – December 2025
Publish and consult on Proposed Plan and the SEA
Report
January – March 2026
Publish Equalities Impact Assessment, Public Sector
Equality Duty Assessment, Fairer Scotland Duty
Assessment and Habitat Regulations Appraisal
alongside Proposed Plan
January 2026
Assess representations. Consider any changes and
progress to examination stage.
April – December 2026**
Table continues on next page
Perth and Kinross DEVELOPMENT PLAN SCHEME October 2024 4
Page 19 of 146

Page 20

Perth and Kinross DEVELOPMENT PLAN SCHEME October 2024 5
Stage When
Examination
Examination of Proposed LDP3 January – June 2027**
Consider Examination
recommendations. Publish any
changes. Resend modified Proposed
LDP3 to Scottish Ministers
July – September 2027**
Amend SEA in light of Examination
recommendations, if necessary
July – September 2027**
Adoption
Publish and Publicise Adopted LDP3 October – December
2027
Publish SEA Post Adoption Statement Post December 2027
* This timescale is based on information from the Scottish
Government and will depend on the complexity of issues in
the Evidence Report. 
** This timescale for this stage will depend on the number
and complexity of representations received to the Proposed
Plan. 
A detailed timeline outlining the Local Development Plan’s
key stages and the types of engagement to take place is
provided in the Participation Statement.
All planning authorities have five years from the regulations coming
into force to replace their current Local Development Plan with a new
style Local Development Plan. This means the Council must prepare
and adopt LDP3 by no later than May 2028. 
Development Plan Schemes must specify the numbered Quarter (Q)
and the year in which the planning authority expects to publish
certain elements of the Local Development Plan process. This applies
to the following stages: 
Publish Evidence Report   Q4 2025 (January - March 2025)
Publish Proposed Plan  Q4 2026 (January - March 2026)
Send Proposed Plan to Scottish Ministers Q4 2027 (January - March 2027)
Adopt LDP3 Q3 2027 (October - Dec 2027)
Note: for the above, a Quarter refers to a three-month period of each
financial year which runs from April to March. 
Quarter 1 is April to the end of June; 
Quarter 2 is July to the end of September; 
Quarter 3 is October to the end of December; and 
Quarter 4 is January to end of March.
Page 20 of 146

Page 21

Perth and Kinross DEVELOPMENT PLAN SCHEME October 2024 6
Mediation
The Council will work with all stakeholders to discuss
any issues which could lead to potential
challenges/concerns throughout the plan
preparation process. One method that can be used
to support this is mediation, which can help aid
discussions.
The preparation of the Evidence Report may provide
the opportunity for concerns or disputes in the
evidence base to be discussed, to explore whether a
potential dispute may be resolved at this stage.
Mediation may be used in the latter stages of the
plan preparation when the Proposed Plan is
published and subject to further representations. 
The Council will be open to considering any requests
from stakeholders to use mediation, taking into
account the potential benefits in terms of saving
time and cost, and fostering better relationships
going forward. This could be on an informal basis or
through an independent third party
Local Place Plans
Local Place Plans (LPPs) offer communities the opportunity to produce a
plan for their area expressing their aspirations and ambitions for future
change. They focus on the community’s proposals for the development and
use of land and provide a new opportunity for communities to feed into the
planning system with ideas and proposals. 
LPPs may be registered and taken account of in LDP3. While the regulations
set out the legislative process, they leave scope for different approaches to
preparation and consultation of an LPP. For each LPP to be taken into
account in the LDP process, an LPP Expression of Interest may be submitted
at the start of its preparation, and those LPPs that are registered by 31
January 2025 will have most opportunity to be taken into account when
preparing the Local Development Plan.
Information and guidance have been published for community groups who
are interested in producing their own LPP and communities can seek
assistance from the Council and its partners. This process of support is
designed to be flexible to respond to issues as they arise. Further
information on LPPs can be found here:
Local Place Plans - Perth & Kinross Council (www.pkc.gov.uk/localplaceplans)
Page 21 of 146

Page 22

Participation Statement
The Planning (Scotland) Act 2019 places an increased emphasis on up-front engagement. This means that consultation needs to be comprehensive,
co-ordinated and collaborative.
The Participation Statement sets out our approach to consultation and engagement associated with the review of the Perth & Kinross Local Development Plan 3
(LDP3). Our consultation commitment is set out below.
Consultation Commitment Statement
The LDP3 engagement and evidence building process will be:
Perth and Kinross Local Development Plan review: participation statement October 2024 7
Relevant Discussions will be relevant to each group or stakeholder, including both settlement
development and policies and the methods that are used to carry out those discussions.
Inclusive To shape places that work for all we will proactively seek the views of all people, especially
those with specific needs and those whose views are seldom heard; identify and overcome
barriers to engagement and invest in the promotion of the benefits of engaging.
Informed Discussions will be informed by evidence already available including data gathering and
prior consultations to ensure contributions have a greater impact and are more efficient
Co-ordinated A joined up approach with the rest of Council and Council strategies, will deliver greater
efficiency, and help avoid consultation fatigue. Information fed back to other departments will
also help deliver their priorities
Collaborative Co-designing consultation and supporting community partners to carry out their own
engagement work will ensure the greatest reach and response working
Transparent Ongoing communication and feedback between the team and stakeholders, communities
and partners will support better outcomes and promote acceptance of outcomes.
Accessible Engagement events and materials for the general public must be accessible to all
wherever possible, and tailored arrangements made where this is not possible.
Page 22 of 146

Page 23

Participation Statement
Who will be consulted?
Everyone will have an opportunity to get involved and
comment throughout the LDP3 in the various stages of
plan preparation. Once the Proposed LDP3 has been
published there will be limited opportunity for further
engagement, so it is important to get involved during
the earlier stages of the process to ensure your voice is
heard. We will keep you updated on when events are
happening by publicising them on our website, through
Council social media accounts such as facebook, using
email updates and through the DPS Participation
Statement. Throughout the preparation of LDP3, our
approach to engagement and consultation will be based
on a collaborative approach, including (but not
exclusively) representatives of the following:
Community Planning Partners:
 Jobcentre Plus
 NHS Tayside
 Perth & Kinross Association of Voluntary Services (PKAVS)
 UHI Perth
 Police Scotland
 Scottish Enterprise
 Scottish Fire & Rescue Service
 Skills Development Scotland  Community Development Trusts
 Communities of Interest
 Landowners and Developers
 Businesses and business groups
 Locality Partnerships
 Tertiary students
 Older people
 Communities wishing to prepare Local Place Plans
Where not already specified, we will seek the views of
representatives of the following particular groups of
people:
 children and young people
 disabled people
 Gypsy/Travellers
 Community Councils
Key agencies:
 NatureScot
 SEPA
 Scottish Water
 Scottish Enterprise
 TACTRAN
 NHS Tayside
 Historic Environment Scotland
 Scottish Forestry
 Transport Scotland
Perth and Kinross Local Development Plan review: participation statement October 2024 8
Page 23 of 146

Page 24

Methods for Engagement
The experience of preparing previous LDPs has helped us learn how to improve the way we include the public and
reach a wide range of people. We are conscious that the pandemic and the cost-of-living crises have had an impact
on people, which is why we are proposing to have a mix of in person and digital platform consultation and
engagement events and meetings.
Proposed methods for information sharing, engagement and consultation for the preparation of LDP3 may include:
 Press releases;
 Social media alerts;
 Information and updates on Council webpage;
 Directly notifying people signed up to our updates mailing list. You can sign up here
developmentplan@pkc.gov.uk
 In person and online meetings and discussions;
 Drop-in sessions and engagement events using the Place Standard Tool in various locations across the council
area;
 Engaging with under-represented groups;
 Notifying neighbouring properties to sites that are being considered for inclusion within the plan;
 Council Consultation Hub – online questionnaires
Key Stages in the process for engaging
The following section outlines the key stages of preparation and the actions that have been/will be undertaken.
Perth and Kinross Local Development Plan review: participation statement October 2024 9
Page 24 of 146

Page 25

Prepare Evidence Report (commenced 2022 and ongoing through to late 2024)
Identification of groups and stakeholders to be proactively engaged Early 2022
Discussion with community partners and community councils on best consultation methods Early 2022
Co-ordination with other PKC departments on delivery of engagement, including those that
may not need targeting at this early stage due to recent or existing work
Mid 2022
Co-ordination with other PKC departments, community councils and community development
trusts to secure way forward for Local Place Plans
Late 2022
Launch of online area wide place feedback platform on consultation hub December 2022
Publicity and media support for upcoming engagement activities and throughout January-August 2023
Exploration of issues of importance with communities of place and community councils
through Place Standard; including tailored discussions reflecting both policies and place
such as affordable housing or natural space needs
January-August 2023
General opportunities for the public (including landowners and developers) for discussions on
policy and place such as the online place standard or surveys on consultation hub
January-August 2023
Local Place Plan invitation October 2023
Assisting Community Councils and community partners to support the delivery of inclusive
engagement to support LDP work and feeding into Local Place Plans
January 2023-October
2024
Targeted discussions online and in person around policy with specified communities of interest
or with specific (land use) need
January-December 2023
Sharing and co-ordination of information with other services and strategies including Perth
People Place and Mobility Strategy
Late 2023
Targeted discussions with communities of interest or need about the places they live to
support the wider public consultation
January-December 2023
Discussion with key agencies and PKC stakeholders on data gathered to date and future plans
that may affect policies or place including capacity of education, health, water etc.
Late 2023-December 2024
Evidence Report checked for compatibility with any Local Place Plans; and place-based evidence
shared with communities to inform LPPs Late 2023-December 2024
Perth and Kinross Local Development Plan review: participation statement October 2024 10
Page 25 of 146

Page 26

Collation and Submission of Evidence Report for Gate Check (April 2025)
Collation of information and analysis of data and consultation exercises to inform
identification of sites at the next stage
October 2023-December
2024
Collation, publication and submission of the Evidence Report February – March 2025
Perth and Kinross Local Development Plan review: participation statement October 2024 11
Page 26 of 146

Page 27

Collaborative Preparation of Proposed Plan (April 2025 to early 2026)
Following gatecheck of the Evidence Report, should any additional consultation be required
by the Reporter this will be carried out and the final Evidence Report resubmitted
April-June 2025
Issue Call for Sites and Ideas April-May 2025
Local policy options relevant to each group or stakeholder discussed to find a preferred way
forward or options
April-December 2025
Specific policy and place ideas, including those in Local Place Plans, explored with
communities and discussed with developer and landowner groups and contacts
April-December 2025
Place proposals analysed (draft SEA and HRA) and comments sought from specific groups
previously engaged with, community councils and public at large on preferred options
April-December 2025
Policy and site preferences discussed with key agencies and PKC stakeholders April-December 2025
All consultation and evidence analysed; outstanding issues discussed with stakeholders and
potential resolutions incorporated into the Proposed Plan Late 2025
Proposed Plan drafted and submitted to Council Early 2026
Perth and Kinross Local Development Plan review: participation statement October 2024 12
Page 27 of 146

Page 28

Perth and Kinross Local Development Plan review: participation statement October 2024 13
Proposed Plan Consultation (early to mid 2026)
Proposed Plan is published alongside HRA and SEA and general consultation January-March 2026
Public events to publicise the Proposed Plan and invite comments January-March 2026
Evidence is shared with communities preparing Local Place Plans Early 2026
Page 28 of 146

Page 29

Examination of Proposed Plan (late 2026 to early 2027)
Prepare examination papers April-December 2026
Proposed Plan with any modifications submitted to Scottish Ministers together with a Late 2026-Early 2027
summary of unresolved issues
Modify Proposed Plan (mid 2027)
Make requisite modifications to Proposed Plan on receipt of examination report July-September 2027
Adopt Local Development Plan (mid-late 2027)
Publish adopted Local Development Plan October-December 2027
Publish post-adoption statement Post-December 2027
Adopt and publish the Delivery Programme Post-December 2027
Perth and Kinross Local Development Plan review: participation statement October 2024 14
Page 29 of 146

Page 30

If you or someone you know would like a copy of this
document in another language or format, (on occasion,
only a summary of the document will be provided in
translation), this can be arranged by contacting the
Customer Service Centre on 01738 475000.
You can also send us a text message on 07824 498145.
All Council Services can offer a telephone translation
facility.
For key updates on the preparation of LDP3 please email
developmentplan@pkc.gov.uk
and ask to be added onto our database.
(PKC Design Team - 2020167)
www.pkc.gov.uk
Page 30 of 146

Page 31

rgr
PERTH & KINROSS
C O U N C IL
Perth and Kinross
DEVELOPMENT PLAN SCHEME
Programme for Local Development Plan 3: May 2025 DRAFT
5
Page 31 of 146

Page 32

Perth and Kinross DEVELOPMENT PLAN SCHEME May 2025 1
Development Plan Scheme
The Development Plan Scheme is a statement setting out Perth & Kinross Council’s timetable for the preparation of the next development plan.
Under statutory guidance, all planning authorities are required to publish annually a Development Plan Scheme. The Development Plan Scheme
will set out to include:
 an explanation of what the Local Development Plan is;
 a timetable for the preparation of the next plan, Local Development Plan 3;
 community engagement in the planning process and how relevant stakeholders, including residents of Perth and Kinross, can get involved.
OVERVIEW
Page 32 of 146

Page 33

Local Development Plan
The Scottish Government requires every planning authority to prepare development plans for their area. The Development Plan is at the
heart of the planning system setting out policies and proposals to guide the development, management and use of land. The Plan sets
out a vision and a framework for future development; addressing needs and opportunities in relation to housing, economy,
infrastructure, community facilities, safeguarding and enhancing environmental and landscape assets, the emerging needs of climate
change and achieving well designed places for the residents, communities and businesses of Perth and Kinross. To support the
preparation of the next Local Development Plan, there are a range of other plans and strategies that interlink with the LDP.
National Planning
Framework (NPF4)
Community Plan &
Corporate Plan
Regional
Spatial
Strategy
Government
advice &
strategies
Local Housing Strategy Local Place Plans
The
Development Plan
National Planning Framework 4
Tayside Local Biodiversity
Action Plan
+
Local Development Plan
Strategies including
Forest & Woodland, Open
Space, Food Growing
Climate Change Strategy &
Action Plan
Mobility Strategy
Perth City Plan Planning Guidance
Perth and Kinross DEVELOPMENT PLAN SCHEME May 2025 2
Page 33 of 146

Page 34

National Planning
Framework 4 (NPF4)
LDP3 Process
The Planning (Scotland) Act 2019 has introduced a
number of changes to the key steps for preparing a Local
Development Plan. Preparation of a new-style LDP will
include:
 Evidence gathering and early community and
stakeholder engagement leading to an Evidence Report.
 Submission of the Evidence Report to Scottish
Ministers for an independent Gate Check.
 Collaborative plan preparation, leading to publication of
the Proposed Plan for consultation.
 Submission of the Proposed Plan to Scottish Ministers
for an independent examination of outstanding issues.
 Adoption of the Local Development Plan
National Planning Framework 4 was adopted in February
2023 and forms part of the Development Plan. It covers
the period from its adoption to 2045 with 10 year reviews.
It is a long term strategy that plans for development and
investment in infrastructure; and identifies national
developments and other strategically important
opportunities in Scotland. The NPF contains both spatial
and thematic planning policies and sets out the national
policy position for land use planning. It will be used to
determine planning applications.
The New Plan: LDP3
Supporting assessmentsAlongside National Planning Framework 4, the Local
Development Plan (LDP3) will be the main document
which will influence future built development in Perth
and Kinross. As NPF4 contains planning policy, new
LDPs will be place-based documents with emphasis on
maps, site briefs and masterplans, with minimal policy
wording. The policies and proposals within the LDP are
to be focused on places and locations, while National
Planning Framework 4 will provide overarching thematic
policies for decision making.
There are several assessments that must be undertaken
to support the preparation of a new Local Development
Plan. They are an integral part of the plan-making
process and should inform, and be informed by, the plan
as it is being prepared. These include:
 Strategic Environmental Assessment (SEA)
 Public Sector Equality Duty Assessment
 Fairer Scotland Duty Assessment
 Habitats Regulations Appraisal
Perth and Kinross DEVELOPMENT PLAN SCHEME May 2025 3
Page 34 of 146

Page 35

LDP3 Timeline
The LDP3 Timeline opposite shows the timescales for each stage
of the plan making process. Key to note is the extended
timescale for preparation of the Proposed Plan. The previous
Development Plan Scheme (October 2024) anticipated that the
Proposed Plan would be published during Q4 2025 (January -
March), however it is now programmed for Q4 2026 (January -
March).
There is a significant amount of work to be undertaken to
prepare the Proposed Plan.  Many of the tasks ahead will require
collaboration both internally, and with key agencies,
communities, infrastructure providers, the development industry,
and landowners. This pathway for collaboration has already been
established through the earlier engagement for the Evidence
Report.
Preparation of the Evidence Report, followed by a stage that
allocates more time to engage and work collaboratively to
prepare the Proposed Plan, should produce a plan that meets
with greater consensus at the Examination stage.
This has led us to revise the timetable to allocate more time to
preparing the Proposed Plan and less time for the period from
Examination to Adoption.
The LDP3 Timeline on the next page shows the timescales for
each stage of the plan making process. Key to note is the
extended timescale for preparation of the Proposed Plan. The
previous Development Plan Scheme (October 2024) anticipated
that the Proposed Plan would be published during Q4 2025/6
(January – March 2026), however it is now programmed for
Q4 2026/7 (January – March 2027).
There is a significant amount of work to be undertaken to
prepare the Proposed Plan.  Many of the tasks ahead will require
collaboration both internally, and with key agencies,
communities, infrastructure providers, the development industry,
and landowners. This pathway for collaboration has already been
established through the earlier engagement for the Evidence
Report.
Preparation of the Evidence Report, followed by a stage that
allocates more time to engage and work collaboratively to
prepare the Proposed Plan, should produce a plan that meets
with greater consensus at the Examination stage.
This has led us to revise the timetable to allocate more time to
preparing the Proposed Plan and less time for the period from
Examination to Adoption.
This means that the intended adoption date for the new Local
Development Plan, whilst not exact, remains unchanged and likely
to be late 2027.
All planning authorities have five years from the regulations
coming into force to replace their current Local Development Plan
with a new style Local Development Plan. This means the Council
must prepare and adopt LDP3 by no later than May 2028. 
Development Plan Schemes must specify the numbered
Quarter (Q) and the year in which the planning authority expects
to publish certain elements of the Local Development Plan process.
This applies to the following stages: 
Publish Evidence Report   Q4 2024/5 (Jan - Mar 2025)
Publish Proposed Plan  Q4 2026/7 (Jan - Mar 2027)
Send Proposed Plan to Scottish Ministers Q1 2027/8 (Apr - Jun 2027)
Adopt LDP3 Q3 2027/8 (Oct - Dec 2027)
A detailed timeline outlining the Local Development Plan’s key
stages and the types of engagement to take place is provided in
the Participation Statement.
Perth and Kinross DEVELOPMENT PLAN SCHEME May 2025 4
Page 35 of 146

Page 36

Perth and Kinross DEVELOPMENT PLAN SCHEME May 2025 5
Page 36 of 146

Page 37

Perth and Kinross DEVELOPMENT PLAN SCHEME May 2025 6
Mediation
The Council will work with all stakeholders to discuss
any issues which could lead to potential
challenges/concerns throughout the plan
preparation process. One method that can be used
to support this is mediation, which can help aid
discussions.
The preparation of the Evidence Report may provide
the opportunity for concerns or disputes in the
evidence base to be discussed, to explore whether a
potential dispute may be resolved at this stage.
Mediation may be used in the latter stages of the
plan preparation when the Proposed Plan is
published and subject to further representations. 
The Council will be open to considering any requests
from stakeholders to use mediation, taking into
account the potential benefits in terms of saving
time and cost, and fostering better relationships
going forward. This could be on an informal basis or
through an independent third party
Local Place Plans
Local Place Plans offer communities the opportunity to produce a plan for
their area expressing their aspirations and ambitions for future change.
They focus on the community’s proposals for the development and use of
land and provide a new opportunity for communities to feed into the
planning system with ideas and proposals. 
While the steps to prepare a Local Place Plan are set out in regulations and
guidance, there is scope for different approaches to be taken. Once
registered, Local Place Plans are taken into account when the Proposed Plan
is being prepared. They are valuable because they help us to better
understand local issues and how to meet the community’s needs.
Local Place Plans may be prepared at any time; however those that are
registered in 2025 will have most opportunity to be taken into account when
preparing the Proposed Plan.
Information and guidance have been published for community groups who
are interested in producing their own Local Place Plan and communities can
seek assistance from the Council and its partners. This process of support is
designed to be flexible to respond to issues as they arise. Further
information on Local Place Plans can be found here:
Local Place Plans - Perth & Kinross Council (www.pkc.gov.uk/localplaceplans)
Page 37 of 146

Page 38

Participation Statement
The Planning (Scotland) Act 2019 places an increased emphasis on up-front engagement. This means that consultation needs to be comprehensive,
co-ordinated and collaborative.
The Participation Statement sets out our approach to consultation and engagement associated with the review of the Perth & Kinross Local Development Plan 3
(LDP3). Our consultation commitment is set out below.
Consultation Commitment Statement
The LDP3 engagement and evidence building process will be:
Perth and Kinross Local Development Plan review: participation statement May 2025 7
Relevant Discussions will be relevant to each group or stakeholder, including both settlement
development and policies and the methods that are used to carry out those discussions.
Inclusive To shape places that work for all we will proactively seek the views of all people, especially
those with specific needs and those whose views are seldom heard; identify and overcome
barriers to engagement and invest in the promotion of the benefits of engaging.
Informed Discussions will be informed by evidence already available including data gathering and
prior consultations to ensure contributions have a greater impact and are more efficient
Co-ordinated A joined up approach with the rest of Council and Council strategies, will deliver greater
efficiency, and help avoid consultation fatigue. Information fed back to other departments will
also help deliver their priorities
Collaborative Co-designing consultation and supporting community partners to carry out their own
engagement work will ensure the greatest reach and response working
Transparent Ongoing communication and feedback between the team and stakeholders, communities
and partners will support better outcomes and promote acceptance of outcomes.
Accessible Engagement events and materials for the general public must be accessible to all
wherever possible, and tailored arrangements made where this is not possible.
Page 38 of 146

Page 39

Participation Statement
Who will be consulted?
Everyone will have an opportunity to get involved and
comment throughout the LDP3 in the various stages of
plan preparation. Once the Proposed LDP3 has been
published there will be limited opportunity for further
engagement, so it is important to get involved during
the earlier stages of the process to ensure your voice is
heard. We will keep you updated on when events are
happening by publicising them on our website, through
Council social media accounts such as facebook, using
email updates and through the DPS Participation
Statement. Throughout the preparation of LDP3, our
approach to engagement and consultation will be based
on a collaborative approach, including (but not
exclusively) representatives of the following:
Community Planning Partners:
 Jobcentre Plus
 NHS Tayside
 Perth & Kinross Association of Voluntary Services (PKAVS)
 UHI Perth
 Police Scotland
 Scottish Enterprise
 Scottish Fire & Rescue Service
 Skills Development Scotland  Community Development Trusts
 Communities of Interest
 Landowners and Developers
 Businesses and business groups
 Locality Partnerships
 Tertiary students
 Older people
 Communities wishing to prepare Local Place Plans
Where not already specified, we will seek the views of
representatives of the following particular groups of
people:
 children and young people
 disabled people
 Gypsy/Travellers
 Community Councils
Key agencies:
 NatureScot
 SEPA
 Scottish Water
 Scottish Enterprise
 TACTRAN
 NHS Tayside
 Historic Environment Scotland
 Scottish Forestry
 Transport Scotland
Perth and Kinross Local Development Plan review: participation statement May 2025 8
Page 39 of 146

Page 40

Methods for Engagement
The experience of preparing previous LDPs has helped us learn how to improve the way we include the public and
reach a wide range of people. We are conscious that the pandemic and the cost-of-living crises have had an impact
on people, which is why we are proposing to have a mix of in person and digital platform consultation and
engagement events and meetings.
Proposed methods for information sharing, engagement and consultation for the preparation of LDP3 may include:
 Press releases;
 Social media alerts;
 Information and updates on Council webpage;
 Directly notifying people signed up to our updates mailing list. You can sign up here
developmentplan@pkc.gov.uk
 In person and online meetings and discussions;
 Drop-in sessions and engagement events using the Place Standard Tool in various locations across the council
area;
 Engaging with under-represented groups;
 Notifying neighbouring properties to sites that are being considered for inclusion within the plan;
 Council Consultation Hub – online questionnaires
Key Stages in the process for engaging
The following section outlines the key stages of preparation and the actions that have been/will be undertaken.
Perth and Kinross Local Development Plan review: participation statement May 2025 9
Page 40 of 146

Page 41

Prepare Evidence Report (commenced 2022 and ongoing through to late 2024)
Identification of groups and stakeholders to be proactively engaged Early 2022
Discussion with community partners and community councils on best consultation methods Early 2022
Co-ordination with other PKC departments on delivery of engagement, including those that
may not need targeting at this early stage due to recent or existing work
Mid 2022
Co-ordination with other PKC departments, community councils and community development
trusts to secure way forward for Local Place Plans
Late 2022
Launch of online area wide place feedback platform on consultation hub December 2022
Publicity and media support for upcoming engagement activities and throughout January-August 2023
Exploration of issues of importance with communities of place and community councils
through Place Standard; including tailored discussions reflecting both policies and place
such as affordable housing or natural space needs
January-August 2023
General opportunities for the public (including landowners and developers) for discussions on
policy and place such as the online place standard or surveys on consultation hub
January-August 2023
Local Place Plan invitation October 2023
Assisting Community Councils and community partners to support the delivery of inclusive
engagement to support LDP work and feeding into Local Place Plans
January 2023-October
2024
Targeted discussions online and in person around policy with specified communities of interest
or with specific (land use) need
January-December 2023
Sharing and co-ordination of information with other services and strategies including Perth
People Place and Mobility Strategy
Late 2023
Targeted discussions with communities of interest or need about the places they live to
support the wider public consultation
January-December 2023
Discussion with key agencies and PKC stakeholders on data gathered to date and future plans
that may affect policies or place including capacity of education, health, water etc.
Late 2023-December 2024
Evidence Report checked for compatibility with any Local Place Plans; and place-based evidence
shared with communities to inform LPPs Late 2023-December 2024
Perth and Kinross Local Development Plan review: participation statement May 2025 10
Page 41 of 146

Page 42

Collation and Submission of Evidence Report for Gate Check (April 2025)
Collation of information and analysis of data and consultation exercises to inform
identification of sites at the next stage
October 2023-December
2024
Collation, publication and submission of the Evidence Report February – March 2025
Perth and Kinross Local Development Plan review: participation statement May 2025 11
Page 42 of 146

Page 43

Collaborative Preparation of Proposed Plan (April 2025 to early 2027)
Following gatecheck of the Evidence Report, should any additional consultation be required
by the Reporter this will be carried out and the final Evidence Report resubmitted
June-July 2025
Issue Call for Sites April-June 2025
Local policy options relevant to each group or stakeholder discussed to find a preferred way
forward or options
April 2025-September 2026
Specific policy and place ideas, including those in Local Place Plans, explored with
communities and discussed with developer and landowner groups and contacts
April 2025-April 2026
Place proposals analysed (draft SEA and HRA) and comments sought from specific groups
previously engaged with, community councils and public at large on preferred options
April 2025-December 2026
Policy and site preferences discussed with key agencies and PKC stakeholders April-December 2025
All consultation and evidence analysed; outstanding issues discussed with stakeholders and
potential resolutions incorporated into the Proposed Plan Autumn 2026
Proposed Plan drafted and submitted to Council Late 2026
Perth and Kinross Local Development Plan review: participation statement May 2025 12
Page 43 of 146

Page 44

Perth and Kinross Local Development Plan review: participation statement May 2025 13
Proposed Plan Consultation (early 2027)
Proposed Plan is published alongside HRA and SEA and general consultation January-March 2027
Public events to publicise the Proposed Plan and invite comments January-March 2027
Page 44 of 146

Page 45

Examination of Proposed Plan (early to mid 2027)
Prepare examination papers March-May 2027
Proposed Plan with any modifications submitted to Scottish Ministers together with a August 2027
summary of unresolved issues
Modify Proposed Plan (mid to late 2027)
Make requisite modifications to Proposed Plan on receipt of examination report September-October 2027
Adopt Local Development Plan (mid-late 2027)
Publish adopted Local Development Plan December 2027
Publish SEA post-adoption statement December 2027
Adopt and publish the Delivery Programme Post-December 2027
Perth and Kinross Local Development Plan review: participation statement May 2025 14
Page 45 of 146

Page 46

If you or someone you know would like a copy of this
document in another language or format, (on occasion,
only a summary of the document will be provided in
translation), this can be arranged by contacting the
Customer Service Centre on 01738 475000.
You can also send us a text message on 07824 498145.
All Council Services can offer a telephone translation
facility.
For key updates on the preparation of LDP3 please email
developmentplan@pkc.gov.uk
and ask to be added onto our database.
(PKC Design Team - 2020167)
www.pkc.gov.uk
Page 46 of 146

Page 47

Perth & Kinross Council
Local Development Plan 2:
Delivery Programme 2019-2029
Addendum: 31 March 2025
Housing Land Pipeline
5
Page 47 of 146

Page 48

1
Contents  Page
Introduction and reason for addendum 2
Local Development Plan 2 Delivery Programme – Housing Land Pipeline 3
Delivery Programme February 2024 update – Housing Land Pipeline  8
Feedback and future LDP2 Delivery Programmes 13
Page 48 of 146

Page 49

2
Introduction and reason for addendum
The Delivery Programme 2019-2029 (published in January 2020) was prepared to support the delivery of the Perth & Kinross Local Development
Plan (LDP) 2. It set out the actions and partnerships required to implement the Plan. The Delivery Programme has since been updated and re-
published in February 2022 and again in February 2024.
As was reported to Committee with the February 2024 update, the Local Development Planning Guidance published in May 2023 sets out a
significantly enhanced role for delivery programmes. In accordance with The Planning (Scotland) Act 2019 (Commencement No.12 and Saving
and Transitional Provisions) Regulations 2023 the Council had already moved from preparing an ‘Action Programme’ to a ‘Delivery Programme’.
It was recognised, however, that trying to retrospectively prepare a delivery programme for the adopted LDP2 (by then four years old) which
would meet all the new asks set out in the Local Development Plan Guidance would be extremely challenging and resource intensive, and would
significantly impact on planning officers’ ability to resource the preparation of the new delivery programme for LDP3. It was suggested that it was
reasonable and proportionate to update the LDP2 Delivery Programme along similar lines to that which had been done previously, and the
updated Programme was agreed by Committee on that basis.
Since the February 2024 Delivery Programme update, however, there has come a specific requirement from Scottish Ministers for delivery
programmes to include the ‘sequencing of, and timescale for, the delivery of housing sites allocated in local development plans’ (Chief Planner
Letter – June 2024). This addendum to the LDP2 Delivery Programme has therefore been prepared to establish a housing land pipeline for the
delivery of housing sites allocated in LDP2. 
Page 49 of 146

Page 50

3
Local Development Plan 2 Delivery Programme – Housing Land Pipeline
The purpose of the housing land pipeline is to provide a transparent view of the phasing of housing allocations. Representing when land will be
brought forward, phasing is expected across the short, medium and long term. The annual housing land audit should monitor the delivery of
housing land by collating information on past completions and the forward programming of new homes (Local Development Planning Guidance). 
Figure 1 sets out the expected sequencing of LDP2 housing land allocations by Housing Market Area when the Plan was adopted in November
2019. This information has been extracted from the 2018 Housing Land Audit which was the most recently published Audit when the Plan was
adopted. Figure 2 sets out the programming by year.
KEY
Under construction or where first homes are to be completed in years 1-3 (short-term sites)
Where first homes are to be completed in years 4-6 (medium-term sites)
Where first homes are to be completed in years 7-10 (long-term sites)
Sites currently constrained
Figure 1 LDP2 allocations by expected year of first completions and Housing Market Area
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE
REF
Audit
year
2018/19
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
GREATER DUNDEE HOUSING MARKET AREA
Inchture Moncur Farm Road Private/ HA H24   10 25 25 6  
HIGHLAND PERTHSHIRE HOUSING MARKET AREA
Ballinluig
Buail Bhan 1 (1
suspensive condition
outstanding) Atholl Estates H40   5 5 5  
Pitlochry Middleton of Fonab
A & J Stephen/
HA H38   5 10 10 10 10 10 10 4  
Aberfeldy Borlick
A & J Stephen/
HA H36   20 20 20 20 20 20 20 20 20 20
Murthly Bridge Road
A & J Stephen/
HA H45   6 6  
Kenmore Primary School East Private/ HA H42   5 5 5 5 5 2  
Pitlochry Robertson Crescent
A & J Stephen/
HA H39   5 10 10 13 12 12 12 12
Page 50 of 146

Page 51

4
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE
REF
Audit
year
2018/19
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
KINROSS HOUSING MARKET AREA
Kinross
Town Hall, 108-114
High Street Edinburgh MI Ltd Op24   9  
Balado
Balado (further
applications received)
Messrs Lawrie &
Sons/ Premier
Properties H51   5 5 5 5 5 5 5  
Hattonburn Hattonburn
Stewart Milne
Homes H52   18 4  
Milnathort Pace Hill Dundas Estates H49   25 25 18  
Milnathort Pitdownie
Trustees of
Church of
Scotland/
Ferrand Trust H48   5 5 15 10 14  
Milnathort Old Perth Road Stewart Milne H50   14 12  
Powmill Gartwhinzean 2 Thomson Homes H53   5 10 10 10 10 10 4  
by Milnathort Ochil Hills Hospital Fossoway LLP Op19   5 10 10 10  
Scotlandwell Scotlandwell Private/ HA H54   5 5 5 5 6  
Blairingone Blairingone North Private/ HA MU74
GREATER PERTH HOUSING MARKET AREA
Perth
Gannochy Road (detail
for 48) Gannochy Trust H3 10 24 14 17 17  
Bridge of Earn Kintillo Road
King Group/
Ogilvie Homes/
HA H72 20 15 15 15 15  
Stanley
Station Road / Linn
Road (PH1 detail for
35) Muir Homes H33 25 24  
Perth
Berthapark (detail for
PH1)
Springfield
Properties/ HA MU345 44 92 80 105 105 100 100 100 100 100 100 1974
Luncarty Luncarty South
A & J Stephen, I
& H Brown/ HA MU27   5 20 20 20 20 20 25 25 25 25 469
Stanley
Mill Street (consent
initiated)
Harris and
Sheldon Group
Ltd H31   6 8 8 8 8 4  
Scone Scone North
A & J Stephen/
HA H29   10 25 30 30 40 40 40 40 40 40 314
Page 51 of 146

Page 52

5
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE
REF
Audit
year
2018/19
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
Scone Glebe School LA Op22   30 35  
Perth Almond Valley
Stewart Milne/
Pilkington Trust/
HA MU73   30 40 50 75 75 75 75 75 75 75 257
Stanley Perth Road South Private/ HA H30   5 10 15 15 15 5  
Perth Thimblerow Private/ HA Op2   5 25 25 7  
Dunning Auchterarder Road A & J Stephen H20   12 12 12 12 4  
Bridge of Earn
Oudenarde, Clayton
Road (detail for 150) Hillcrest HA H15   15 15 15 20 20 22 22 21 21 21
Bridge of Earn Oudenarde
G S Brown/
Taylor Wimpey H15   30 40 35 35 35 35 35 35 35 985
Abernethy Newburgh Road North Private/ HA MU8   5 5 5  
Scone Perth Airport Morris Leslie MU3   5 10 15 15 8  
Perth
Ruthvenfield (detail for
12 initiated) J Bryden H319   5 15 25 25 25 25 14  
Burrelton
Church Road,
Woodside Private/ HA H17   5 5 5 6  
Bridge of Earn
Old Edinburgh Road/
Dunbarney Avenue King Group H14   5 10 10 12 12 12 12 12
Balbeggie St Martins Road Private/ HA H13   5 10 10 16 16 15 15 15
Perth
Hillside Hospital,
Dundee Road
(demolished)
Mattew P
Henderson
(administrators) MU337   5 15 15 15 11  
Perth Perth Quarry Private/ HA MU171   10 25 25 25 25 25 9  
Perth
Perth West (outline on
part of site) Private/ HA MU70   30 50 50 80 80 80 80 2615
Stanley Manse Crescent Private/ HA H32   5 10 10 10 10 10 10
Errol Old Village Hall Private/ HA H21   8 9  
Perth Murray Royal Hospital Private/ HA MU336   10 25 25 25 25 8  
Perth Newton Farm Private/ HA H71   30 30 31  
Stanley Perth Road North Private/ HA H34   15 15 15 30
Perth
Scott Street/ Charles
Street Private H1
Page 52 of 146

Page 53

6
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE
REF
Audit
year
2018/19
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
STRATHEARN HOUSING MARKET AREA
Crieff Wester Tomaknock G S Brown/ HA H57   5 10 10 10 10 10 10   52
Comrie Cowden Road A & J Stephen H58   12 12 12 6  
Crieff Broich Road
Robert Simpson
and Son/ HA MU7   10 20 20 20 25 25 25 25 354
Auchterarder North West Kirkton Private/ HA H228   10 20 19 19 19 19
Auchterarder
Auchterarder Dev
Framework 3b Private/ HA H342   10 23 23 23 23 22
Crieff Broich Road North Private/HA MU344
STRATHMORE AND GLENS HOUSING MARKET AREA
Blairgowrie
Glenalmond Road,
Rattray
Springfield
Properties/ HA H63 29 38 28 18 18 15 15 16 16 16  
Meigle Ardler Road
Hadden Homes/
HA H68   7 7 7 8  
Blairgowrie
Blairgowrie South
(further application
received)
Stewart Milne/
Petrie family H64   15 18 18 18 18 18 16  
Alyth
Albert Street and St
Ninians Road Guild Homes/ HA H60   5 15 15 15 15 15 11  
New Alyth New Alyth
A & J Stephen/
HA H61   6 6 6 6  
Blairgowrie Western Blairgowrie
Westpark
Partnership LLP MU5   20 20 20 20 30 30 30 30 29
Spittalfield Spittalfield Private/ HA MU6   5 5 5 5  
Alyth Glenree Private/ HA H59   5 10 10 10 2  
Meigle Forfar Road Private/ HA H69   5 10 20 20 20 7  
Coupar Angus Larghan Private/ HA H65   10 10 10 15 15 14 14 14
Alyth Annfield Place Private/ HA H252   10 10 15 15 15 15 13
Blairgowrie
Welton Road/ Eastern
Expansion Private/ HA MU330   25 25 30 30 30 30 591
Blairgowrie Westfields of Rattray Private/HA H341   20 20 20 20 6  
Source: Perth & Kinross Housing Land Audit 2018
Page 53 of 146

Page 54

7
Figure 2 Housing land programming by year
Source: Perth & Kinross Housing Land Audit 2018
0
100
200
300
400
500
600
700
800
900
1000
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
No. units
LDP2 Housing Land Programming
Page 54 of 146

Page 55

8
Delivery Programme February 2024 update – Housing Land Pipeline
At the time of publishing the February 2024 Delivery Programme update the most recently published housing land audit would have been that
from March 2023. Figure 3 sets out the completions which were delivered in each Housing Market Area over years 1-4 and the programming for
the remainder of the 10 year period.
KEY
Completions since LDP2 adoption
Programming for remainder of the 10 year period
Figure 3 Update from 2023 Housing Land Audit
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE REF
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
GREATER DUNDEE HOUSING MARKET AREA
Inchture Moncur Farm Road G S Brown/ HA H24 6 11 15 10 10
HIGHLAND PERTHSHIRE HOUSING MARKET AREA
Ballinluig Buail Bhan 1
Alexander and Co
Scotland Ltd H40 3   8 8  
Pitlochry Middleton of Fonab A and J Stephen/ HA H38 5 10 10 10 50
Murthly Bridge Road A and J Stephen/ HA H45 9 3  
Aberfeldy Borlick A and J Stephen/ LA H36 10 20 20 20 180
Pitlochry Robertson Crescent A and J Stephen/ HA H39 5 10 10 80
Kenmore Primary School East Private/ HA H42 5 28
KINROSS HOUSING MARKET AREA
by Milnathort Ochil Hills Hospital
Athron Hill
Development
Company Op19   13 11 11  
Milnathort Pitdownie
Springfield
Properties/ HA H48 18 25 24  
Milnathort Old Perth Road Stewart Milne H50 5 5 12 10  
Page 55 of 146

Page 56

9
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE REF
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
Scotlandwell Scotlandwell Private/ HA H54 2 10 10 10  
Powmill Gartwhinzean 2 Kera Scotland Ltd H53 5 15 15 15 23
Balado Balado
Messrs Lawrie and
Sons/ Premier
Properties H51 5 5 25
Milnathort Pace Hill Dundas Estates H49 4 22 37 14  
Hattonburn Hattonburn
Stewart Milne
Homes H52 3 10  
Blairingone Blairingone North Private/ HA MU74  
Kinross
Town Hall, 108-114 High
Street Edinburgh MI Ltd Op24   9  
GREATER PERTH HOUSING MARKET AREA
Perth Berthapark 2 Miller Homes MU345   25 42 4  
Perth
Almond Valley (detail for
340)
Stewart Milne/
Pilkington Trust/ HA MU73   5 25 70 70 70 70 940
Abernethy Newburgh Road North Hadden Homes/ LA MU8 7 25 6  
Stanley Perth Road South Muir Homes/ HA H30 10 24 24 24 24 24 79
Scone
Scone North (detail for
100) A and J Stephen/ HA H29 2 33 14 30 30 30 30 40 40 499
Perth Perth West, Auction Mart Barratt/HA H174 31 79 60 43 34 34  
Perth
Berthapark 1 (detail for
PH1)
Springfield
Properties/ HA MU345 121 101 14 154 50 75 100 100 100 100 2005
Bridge of Earn
Oudenarde, Clayton Road
(detail for 150) Hillcrest Homes H15 5 15 15 15 20 122
Stanley
Mill Street (consent for 33
initiated) Ogilvie Homes H31 6 8 8 8 8 5
Bridge of Earn Oudenarde 2 G S Brown H15 10 20 20 20 18  
Bridge of Earn
Oudenarde 1 (detail for
137) Taylor Wimpey H15 10 30 40 35 35 1062
Page 56 of 146

Page 57

10
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE REF
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
Luncarty
Luncarty South (further
application received)
A and J Stephen, I
and H Brown/ HA MU27   20 20 20 20 20 660
Dunning Auchterarder Road A and J Stephen H20 20 30 18  
Perth
Murray Royal Hospital
(detail for 58)
Rivertree
Residential/ HA MU336   8 20 20 10 70
Perth Thimblerow*
Private/ Hillcrest
Homes Op2 12 25 25  
Stanley Manse Crescent Muir Homes/ HA H32 5 10 10 60
Scone
Perth Airport (expiry
extended) Morris Leslie MU3 5 10 15 35
Perth Gannochy Road 2 Gannochy Trust H3 22 26  
Perth Perth Quarry Private/ HA MU171   10 20 145
Perth
Hillside Hospital, Dundee
Road (demolished)
Matthew P
Henderson
(administrators) MU337   20 20 21
Perth Perth West Private/ HA MU70   30 50 3373
Perth Newton Farm Private/ HA H71 20 90
Perth
Scott Street/ Charles
Street Private H1
Balbeggie St Martins Road Private/ HA H13 85
Bridge of Earn
Old Edinburgh Road/
Dunbarney Avenue King Group H14 104
Errol Old Village Hall Private/ HA H21 20
Perth Ruthvenfield Private/ HA H319   153
Stanley
Station Road / Linn Road
(PH1 detail for 35) Muir Homes H33 32  
Stanley Perth Road North Muir Homes/ HA H34 95
Bridge of Earn Kintillo Road
King Group/ Ogilvie
Homes/ HA H72 12 50 18  
Scone Glebe School LA Op22   46 19  
Page 57 of 146

Page 58

11
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE REF
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
STRATHEARN HOUSING MARKET AREA
Crieff Oakbank
Oakbank (Crieff) Ltd/
Private individuals H17 1   1 1 1 1  
Crieff Wester Tomaknock G S Brown/ HA H57 6 15 15 15 15 15 15 6
Crieff Broich Road North
L and S Homes and
SC Crieff MU344   3 30 5  
Crieff
Broich Road (detail for
246) Ogilvie Homes/ HA MU7 11 66 45 30 25 20 20 20 402
Comrie Cowden Road A and J Stephen H58 12 12 12 16
Crieff Wester Tomaknock 2 D and J Brown H57 5 14
Auchterarder North West Kirkton Private/ HA H228   128
Auchterarder
Auchterarder Dev
Framework 3b Private/ HA H342   150
STRATHMORE HOUSING MARKET AREA
Spittalfield Spittalfield (detail for 2) Private/ HA MU6 1   1   6 6 6
Blairgowrie Blairgowrie South 2 G S Brown H64 10 10 10 6  
Alyth
Albert Street and St
Ninians Road (detail for
27) Guild Homes/ HA H60 10 10 10 15 15 15 30
Blairgowrie Glenalmond Road, Rattray
Springfield
Properties/ HA H63 67 15 15 50 24 24 13  
Blairgowrie Blairgowrie South 1 Scotia Homes/ LA H64 26 30 22  
Meigle Forfar Road Private/ HA H69 5 15 15 15 50
New Alyth New Alyth A and J Stephen/ HA H61 6 6 6 6 9
Blairgowrie
Western Blairgowrie
(detail for 103)
Westpark
Partnership LLP/First
Endeavour LLP MU5 20 20 20 220
Alyth Annfield Place Private/ HA H252   5 107
Page 58 of 146

Page 59

12
SETTLEMENT SITE NAME SITE DEVELOPER
LDP2
SITE REF
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
Blairgowrie Westfields of Rattray Private/HA H341   104
Alyth Glenree Private/ HA H59 45
Coupar Angus Larghan Private/ HA H65 125
Meigle Ardler Road Hadden Homes/ HA H68 14 7 12  
Blairgowrie
Welton Road/ Eastern
Expansion Private/ HA MU330   928
Source: Perth & Kinross Housing Land Audit 2023
*The Council has more recently agreed to develop PH20 on the Thimblerow site and this will be reflected in the next Delivery Programme and Housing Land Pipeline
Figure 4 compares the programming at LDP2 adoption in 2019 (based on the 2018 housing land audit) with the completions and revised
programming over the same period from the 2023 Audit. It should be noted that this only considers the sites allocated for housing in LDP2 and
not those windfall sites which come forward for development unexpectedly. Generally it is expected that the contribution from windfall sites will
increase the further it gets from the Plan adoption date. The other key point to note is that during the period 2018 to 2023 the market had to deal
with the fall-out from Brexit and then the Covid-19 pandemic. This resulted in the programming of many sites being pushed back beyond the 10
year period. The 10 year pipeline compared against the supply beyond year 10 is set out in figure 5.
Figure 4 Programming comparison 
Source: Perth & Kinross Housing Land Audit 2018 and 2023
0
200
400
600
800
1000
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
No. units
Years 1-4: Progamming for 2018
Completions for 2023
LDP2 Housing Land Pipeline - Update
Update from 2023 Housing Land Audit Plan adoption 2019
Page 59 of 146

Page 60

13
Figure 5 The 10 year pipeline compared against the supply beyond year 10
Source: Perth & Kinross Housing Land Audit 2018 and 2023
Feedback and future LDP2 Delivery Programmes
As abovementioned, the requirement for delivery programmes to include the sequencing of, and timescales for, the delivery of housing on sites
allocated by the LDP is relatively recent and as such any feedback on how the information has been presented in this addendum would be
welcomed. Please send any comments or suggestions to: developmentplan@pkc.gov.uk
The Local Development Planning Guidance is clear that the preparation of the delivery programme for an LDP should be considered at the
outset of plan preparation and run alongside it. There are therefore inherent difficulties in trying to do this retrospectively for a Plan which was
adopted more than five years ago. The next update of the LDP2 Delivery Programme is due early in 2026. This will include a further update on
the housing land pipeline as well as any other information set out in the Local Development Planning Guidance which is possible to include at
that time.
0
2000
4000
6000
8000
10000
12000
14000
Year 1
2019/20
Year 2
2020/21
Year 3
2021/22
Year 4
2022/23
Year 5
2023/24
Year 6
2024/25
Year 7
2025/26
Year 8
2026/27
Year 9
2027/28
Year 10
2028/29
Beyond
year 10
2029+
Supply beyond year 10
Update from 2023 Housing Land Audit Plan adoption 2019
Page 60 of 146

Page 61

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure Committee 
Date of Meeting: 28 May 2025 
Report Title: Perth and Kinross Tourism Strategy and Action Plan
2025 - 2030 
Report Number: 25/129 
Report Author: Suzanne Cumiskey, Economic Development Officer 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to seek Council endorsement of the Perth and
Kinross Tourism Strategy and Action Plan 2025 - 2030.  
1.2 Sections 
1. Purpose
2. Recommendations
3. Background
4. Main Issues
5. Conclusions
6. Impact and Value Assessment
7. Appendices 
2. Recommendations 
It is recommended that the Economy and Infrastructure Committee:  
2.1 Endorse the draft Perth and Kinross Tourism Strategy and Action Plan 2025 –
2030 developed by Perthshire Tourism Partnership (PTP). 
2.2 Request that officers bring back annual progress reports to this Committee for
consideration. 
6
Page 61 of 146

Page 62

3. Background 
Historic Information/Context 
3.1 With a population of 151,000 residents and a geography spanning 2000sq
miles Perth & Kinross consistently ranks among the UK’s top places to live
and work and in 2024 was accredited as the ‘Most Welcoming Place on Earth’
at the Booking.com Traveller Review Awards. 
3.2 Central to the destination is the River Tay which at 120 miles long is
Scotland’s longest river and acts as a playground for outdoor enthusiasts for
paddling, kayaking, canoeing and fishing. The River Tay Way, a new walking
& cycling route running from Loch Tay to Perth City Centre offers walkers and
cyclists an off-road route in spectacular surroundings. 
3.3 Perthshire is named ‘Big Tree Country’ due to the great seed collector David
Douglas who travelled the world in the 1800s finding new tree species to
introduce to Scotland, including his namesake, the Douglas Fir which can be
found in abundance at The Hermitage. Home to 28 of Scotland’s 282 Munros,
the area is a first choice for Munro bagging aficionados and outdoor
adventurers. 
3.4 Perth was designated a UNESCO City of Craft and Folk Art in 2021 which
embeds craft into sustainable development and policy making. In the last
decade Perth & Kinross Council has invested £50m + in cultural and heritage
infrastructure in Perth City Centre and £4.5m in funding for culture annually.
Our creative places and spaces include Perth’s Creative Exchange, Perth Art
Gallery, Perth Museum, Perth Theatre & Concert Hall, St Paul’s Church
space, the City of Light Programme and our Vennels Project. The latest
investment is Perth Museum, a brand new £26.5 million refurbishment of a
beautiful historic building in Perth City Centre. Featuring a purpose-built
interior designed to house the Stone of Destiny, which is the most powerful
surviving symbol of Scotland’s royal history. In its first year Perth Museum has
attracted 250,000 visitors. 
3.5 Perthshire is home to two Michelin Star awarded destination restaurants,
‘Restaurant Andrew Fairlie’ at Gleneagles and ‘The Glenturret Lalique; and
award-winning restaurants such as the Old Manse of Blair and Orangery
Restaurant; and Ballintaggart Farm. The area has a strong whisky heritage
and is home to Dewars Aberfeldy Distillery, Glenturret Distillery, Blair Atholl
Distillery and Edradour Distillery. In 2022 there were 915 food and drink
businesses with a reported turnover of £472 million. Perthshire also has
strong diversification of farms with 71 agritourism businesses. 
3.6 Perthshire Tourism Partnership was established in 2005 to bring together the
tourism industry with public sector organisations to discuss strategic themes
and policies relating to tourism in the region with the aim of growing the visitor
economy.  The partnership members include: 
• Blairgowrie and East Perthshire Tourism Association
• Cairngorms Business Partnership
Page 62 of 146

Page 63

• Cairngorms National Park Authority
• Culture Perth & Kinross
• Dunkeld and Birnam Tourism Association
• Glenshee and Strathardle Tourism Association
• Historic Environment Scotland
• Kinross Partnership
• Loch Lomond and Trossachs National Park
• National Trust for Scotland
• Perth & Kinross Council
• Perth & Kinross Countryside Trust
• Perth & Kinross Heritage Trust
• Perth Theatre and Concert Hall
• Perth Traders Association
• Perthshire Business Tourism Group
• Perthshire Chamber of Commerce
• Perthshire Regional Food Group
• Perthshire Tourism Partnership
• Pitlochry Partnership
• Rannoch and Tummel Tourist Association
• Scottish Agritourism
• Visit Aberfeldy
• VisitScotland 
3.7 The partnerships work includes: 
• Delivery of the Perthshire Tourism Action Plan 2021-2025
• Organising industry B2B events, webinars and training
• Facilitating industry connections 
• Facilitating business support and advice
• Providing up-to-date information and minutes  
4. Main Issues 
The Strategy and Action Plan 
4.1 Perthshire Tourism Action Plan 2021 - 2025 was developed and published in
2021 following extensive consultation with the Tourism Leadership Group and
wider industry. The plan was initially developed with a focus on tourism
industry recovery following the pandemic and identified priorities and actions
for all stakeholders (the tourism industry, tourism associations, public sector
agencies, and the local authority). 
4.2 The plan centred on sustainable and responsible growth of the sector,
ensuring that it continued to make a significant contribution to the economy
and vibrancy of the area, acting as a force for good.  
4.3 In 2023 a mid-term review of the Perthshire Tourism Action Plan 2021 - 2025
was undertaken. In 2023 tourism monitoring figures demonstrated that the
tourism sector contributed to:  
Page 63 of 146

Page 64

• 670 tourism businesses in the area with tourism/hospitality being the
highest employer
• 8200 full-time equivalent jobs are supported locally
• 2.3 million tourism visits to Perth and Kinross in 2023 
• 2.8 nights was the average length of stay 
• £703 million was generated directly and indirectly within the local economy
through visitor and tourism business expenditure 
• £641 million was the total economic impact 
• Economic Impact +8.8% 2023 v 2022 
• Visitor Numbers +15.4% 2023 v 2022
• Total Visitor Days and Nights +1.5% 2023 v 2022 
4.4 In 2024, work began on the development of a refreshed plan for the area. It
was agreed that a 5-year timeline would be used, which would align with the
timeframe of the Perth and Kinross Economic Action Plan (2025-2030) and
enable a medium-term strategic framework to be established. The framework
builds on pillars under which actions have been developed, whilst still allowing
for the potential launch and impact of a visitor levy scheme to be assessed.  
4.5 The new tourism strategy and action plan draws on national, regional, and
local strategies to shape and develop the Perth and Kinross Tourism
Strategy & Action Plan 2025 – 2030 including: 
• Scotland Outlook 2030
• Scotland’s National Strategy for Economic Transformation 2022 - 2032 
• Tay Cities Region Prospectus for Regional Growth 2025 - 2035 
• Tay Cities Region Economic Regional Strategy 2019 - 2039 
• Tay Cities Region Tourism Development Prospectus 2025 - 2035 
• Perth and Kinross Economic Action Plan 2025 – 2030 
4.6 Key themes within all the national, regional and local strategies are
developing a stronger more resilient economy: maintaining a focus on
reducing inequalities and transitioning to net zero Scotland by 2045.  
4.7 The strategy is being developed with these principles as key considerations
and against a backdrop of the newly introduced Visitor Levy legislation and
with an ambition to attract both public and private sector investment. 
Strategic Framework 
4.8 There are four pillars intended to guide the actions under the strategy: 
• Area Promotion and Destination Marketing
• Investment and Infrastructure (Placemaking/Visitor 
Infrastructure/Services)
• Market Development & Internationalisation
• Industry Growth and Resilience 
Page 64 of 146

Page 65

4.9     Area Promotion and Destination Marketing  
Objective: Aim to drive up visitation to our area from identified audiences,
increasing day visitors, as well as the length of stay and visitor spend.     
4.10 Investment and Infrastructure          
Objective: Aim to attract inward investment to enhance the visitor experience in
the destination, as well as manage the impact on our communities   
4.11 Market Development and Internationalisation 
Objective: Aim to build on key assets, developing new tourism products and
visitor experiences 
4.12 Industry Growth and Resilience        
Objective. Aim to develop a sustainable visitor economy through supporting
businesses to grow, increase levels of well-paid jobs and build their resilience
in a challenging operating environment 
Monitoring and Impact 
4.13 Perth and Kinross Council have been using STEAM data, produced by Global
Tourism Solutions, and trend data is available for the past twelve years. 
4.14 STEAM figures for 2023 show that there is recovery in visitor numbers and
days and nights spent with a commensurate increase in economic impact.
This strategy aims to ensure that recovery continues, and that the visitor
economy grows, playing an important role in the future economy of Perth and
Kinross. 
4.15 The indicators below are what we will use for tourism performance monitoring
and are derived from STEAM data: 
• Number of businesses
• Total employment
• Total number of visitors
• Number of overnight visitors
• Number of day visitors
• Number of visitor days
• Direct expenditure
• Economic impact of sector 
4.16 The Perth and Kinross Tourism Strategy and Action Plan 2025 - 2030 will be
delivered by the PTP, supported by individual organisations and co-ordinated
by Perth and Kinross Council.  Delivery will be overseen by an industry
leadership group, drawn from various parts of the sector. Meetings will be
held quarterly to monitor progress. 
4.17 A delivery report will be published on an annual basis and the group will
review the action plan annually to ensure alignment to national, regional, and
local strategies and progress against agreed actions. 
Page 65 of 146

Page 66

The Visitor Levy 
4.18 The Visitor Levy Act gives local authorities in Scotland the power to introduce
a levy on overnight accommodation based on a percentage of the cost. Local
authorities have the power to determine the percentage rate set, the
geographical area where it applies and any local exemptions. The authority
can also specify a maximum number of nights to apply the levy and whether it
applies to all or part(s) of its area. 
4.19 Local authorities that want to introduce a visitor levy are only able to do so
after they have consulted with local communities, businesses, and the wider
tourism sector - through early engagement and a formal consultation. 
4.20 In total these processes would take just over 2 years to conclude if the
minimum timescales were applied. For the area, this means that the earliest
date a scheme could come into effect would be late autumn 2027. The
Council has commenced early-stage engagement on the potential of a levy,
as agreed by this Committee on 5 February 2025 (Report ref. 25/28). 
4.21 The potential of a levy is considered as part of this Tourism Strategy and
Action Plan, as well as other potential sources of investment. 
5. Conclusions 
5.1 Tourism continues to be a key economic growth sector for Perth and Kinross.
However, we also recognise the challenges and opportunities, and this
refreshed Perth and Kinross Tourism Strategy and Action Plan 2025-2030 will
outline our ambitions to increase the attractiveness of the destination in a
competitive and changing market, in turn increasing the number of day visitors
and overnight stays; increasing dwell time; overall visitor spends and job
opportunities in our area. 
6. Impact and Value Assessment 
Perth___Kinross_Tourism_Strategy_and_Action_Plan_2025-2030.pdf 
7. Appendices 
7.1 Appendix 1 - Perth & Kinross Tourism Strategy and Action Plan 2025-2030. 
Page 66 of 146

Page 67

Perth and Kinross
TOURISM STRATEGY
& ACTION PLAN 
2025–2030  (DRAFT FOR CONSULTATION)
6
Page 67 of 146

Page 68

Contents
Introduction 3
Background and Strategic Context 5
Area Performance Statistics 7
Understanding The Audience 8
Opportunities for Perth and Kinross 9
Strategic Framework Overview 11
Strategic Framework and Action Plan 12 
2
Page 68 of 146

Page 69

3 
Introduction
The Perth and Kinross Tourism Strategy and Action Plan 2025 – 2030 has been shaped by a
diverse, cross-section of the area’s tourism industry, and delivered on their behalf by Perthshire
Tourism Partnership. Perthshire Tourism Partnership was established to bring together tourism
associations, stakeholders and public sector organisations based in Perth & Kinross to discuss
strategic themes relating to tourism in the region. The partnership is comprised of: 
Blairgowrie and East Perthshire Tourism Association
Cairngorms Business Partnership
Cairngorms National Park Authority
Culture Perth & Kinross
Dunkeld and Birnam Tourism Association
Glenshee and Strathardle Tourism Association
Historic Environment Scotland
Kinross Partnership
Loch Lomond and Trossachs National Park
National Trust for Scotland
Perth & Kinross Council
Perth & Kinross Countryside Trust
Perth & Kinross Heritage Trust
Perth Theatre and Concert Hall
Perth Traders Association
Perthshire Business Tourism Group
Perthshire Chamber of Commerce
Perthshire Regional Food Group
Perthshire Tourism Partnership
Pitlochry Partnership
Rannoch and Tummell Tourist Association
Scottish Agritourism
Visit Aberfeldy 
Designed to be a working and flexible document, the plan sets out a vision for the next five years
and outlines the partner commitments and areas of investment required to ensure its success.
Strengthened by a detailed action plan, the strategy provides clear KPIs, and a delivery
framework consisting of four key pillars.
• Area promotion and destination marketing
• Investment and infrastructure
• Market development and internationalisation
• Industry growth and resilience
PERTHSHIRE TOURISM
PARTNERSHIP
Page 69 of 146

Page 70

4 
About Perth and Kinross 
With a population of 151,000 residents and a geography spanning city, towns, and countryside, Perth and
Kinross consistently ranks among the UK’s top places to live and work. It is renowned as a major events
and festivals destination, with over 500 annual events.
At its heart, the River Tay sets the scene for the area’s magnificent outdoor offering, which encompasses
28 Munros, 48 lochs, 16 rivers and 2000sq miles of glorious Scottish countryside. This profusion of
natural assets has become the picture-perfect backdrop for a host of businesses and activities including
paddleboarding, kayaking, canoeing, fishing, walking and hiking.
Affectionately named ‘Big Tree Country’ due to the great seed collector David Douglas who travelled the
world in the 1800s, the area also boasts spectacular off-road playgrounds for gravel and mountain biking
enthusiasts, as well as the 2024 UCI Cycling World Championships Gran Fondo road cycling route.
Perth was accredited as a UNESCO City of Craft and Folk Art in 2021, firmly embedding its commitment
to culture into sustainable development and policy making. In the last decade Perth and Kinross Council
has invested £50m+ in cultural and heritage infrastructure in Perth City Centre including the £27m
refurbishment of the historic Perth Museum.
The area boasts an international reputation as a food and drink destination. This has been influenced in no
small way by its whisky heritage, Michelin Star restaurants, and multiple award-winning chefs and menus.
Building on these strong foundations, Perthshire has also built a strong agritourism sector, with direct-to-
consumer produce, farm shops, restaurants and accommodation.
Page 70 of 146

Page 71

5 
Background and Strategic Context
The first Perthshire Tourism Action Plan (2021–2025) was developed and published in 2021
following extensive consultation with the Perthshire Tourism Leadership Group and the wider
industry. The plan was developed with a focus on recovery following the pandemic and identified
priorities and actions for all stakeholders.
Following a mid-term review in 2023, it was agreed that from 2025 onward, a 5-year horizon
would be used, to align with the Perth and Kinross Economic Action Plan 2025-2030. This would
enable a long-term strategic framework and action plan to be established in line with national and
local strategies (listed below), and in turn, ensure that visitor sector growth worked to support the
goals and ambitions of the area and its residents.
Using local and national strategies to inform and shape this 5-year plan, was crucial in
ensuring the industry was aligned to current economic drivers, and national objectives. During
this research process, several key themes emerged, particularly in relation to developing a
sustainable economy, reducing inequalities, and delivering a net zero Scotland by 2045. With this
in mind, this new strategy has been developed with responsible tourism at its core and with due
consideration towards the Visitor Levy (Scotland) Act, which was passed in May 2024. 
Strategies: How they all fit together 
Tourism Strategies Economic Strategies 
LOCAL
REGIONAL
NATIONAL
Scotland’s National Strategy for Economic 
Transformation 2022–2032
Scotland Outlook 2030
Tay Cities Regional Economic Strategy (2019-2039
Prospectus for Regional Growth (2024–2029) 
Tay Cities Region: Tourism Development Prospectus
2025–2035 (in development)
Perth and Kinross Council Corporate Plan 2022–2028
Perth and Kinross Community Plan 2022–2032
Perth and Kinross Economic Action Plan 2025–2030
(in development)
Perth and Kinross Tourism Strategy and Action Plan,
2025–2030 (This Document)
Page 71 of 146

Page 72

6 
Vision 
By 2030, tourism will play a greater role in Perth & Kinross by
supporting an inclusive, international and connected visitor
economy.
Mission 
To work collaboratively to strengthen tourism in Perth & Kinross,
ensuring year-round visits, increased stays, and a continued
commitment to delivering quality visitor experiences for all. 
Strategic Objectives 
• Area promotion and destination marketing: Aim to drive up visitation to our area from identified
audiences, increasing day visitors and overnight stays, as well as the length of stay and visitor
spend
• Investment and infrastructure: Aim to attract inward investment to enhance the visitor
experience in the destination, as well as manage the impact on our communities
• Market development and internationalisation: Aim to build on investment to date in key assets,
developing new tourism products and visitor experiences
•  Industry growth and resilience: Aim to develop a sustainable visitor economy through
supporting businesses to grow, increase levels of well-paid jobs and build their resilience in a
challenging operating environment 
Page 72 of 146

Page 73

7 
Area Performance 
+8.8%
Increase in economic impact
2023
+15.4%
Increase in visitor numbers
2023
+1.5%
Increase in total visitor
days and nights
2023
2.3m
tourism visits to
Perth and Kinross
in 2023
5m
visitor days and
nights generated by
visitors in 2023 
2.8 nights
was the average
length of stay in
the area
1.5m
visits were made by visitors
staying within the area,
generating 1.2 million nights
in local accommodation
685
tourism businesses
were registered in
Perthshire in 2024
£641m
total economic impact
Reference: STEAM 2023
Page 73 of 146

Page 74

8 
Understanding the Audience
Understanding who is visiting Perthshire, where they are visiting from, and what their reasons for visiting
are, is pivotal to sustainable growth. There are two aspects to understanding our visitors, through the
results of Scotland’s Visitor Survey and through analysing Visitor Trends.
VisitScotland commissioned Progressive Partnership to clarify and enhance the overall understanding
of visitor attitudes and behaviours. The survey explored all aspects of the overnight visitor experience to
Scotland, providing valuable insights into the sector. It was restricted to leisure only.
Perthshire as a whole:
• 68% of overnight visitors to Perthshire were domestic.
• 32% of overnight stays in Perthshire were international.
• 77% of Scotland visitors who stayed overnight in Perthshire were repeat visitors.
Perth City Centre only:
• 57% of overnight visitors to Perth were domestic.
• 43% of overnight stays in Perth were international.
• 67% of Scotland visitors who stayed overnight in Perth were repeat visitors.
Notably most visitors to Perthshire (79%) were older independents or of retirement age. 13% were
families.
Overnight tourism statistics for 2023 show that domestic (GB) markets made up circa 85% of all visits and
79% of expenditure. International markets made up almost 15% of visits and 21% of expenditure.
Within the domestic market, Scotland’s residents made up 60% of visitors, with the key regions outside of
Scotland being London (10% of trips) and the Northwest (9%). Top international markets for Perthshire in
2023 were the USA (27%), Netherlands (12%), Spain (10%), France (8%), Italy and Australia (7% each).
More information
Page 74 of 146

Page 75

9 
Opportunities for the Visitor Economy in Perth and Kinross
Consumer trends are key to informing investment decisions for sustainable growth. The VisitScotland
Insights Team have produced tourism trend papers for the last decade. They consolidated their work on
tourism trends and highlighted trends from the past that remain relevant today in the document
‘A Decade of Consumer Trends’, published in February 2024. 
Transformational Tourism
This is a shift amongst consumers
to travel with a sense of purpose
and for trips to be meaningful.
Visitors want to maximise their
time in a destination, staying
longer, and giving something
back to the destination they
are visiting through e.g.
voluntourism, learning of new
skills or achievements. Examples
include:
• Voluntourism (Waterway
clear ups/litter Picks)
• New skills/skill sharing
• Craftsmanship. Learning
traditional crafts on holiday
• Achievements (Munro
bagging or sports
challenges)
Wellness
This is a trend amongst
consumers to focus on self-care,
nurturing their physical/mental
wellbeing.
Tourism has the potential to
create a mental space where
people can relax and focus
inward whether that is through
reconnecting with nature,
agritourism experiences, sleep
tourism experiences, phone-
free areas, forest bathing or wild
swimming. Examples include: 
• Wild swimming
• Forest bathing
• Silent retreats/meditation &
mindfulness
• Water therapy (blue spaces)
• Sleep tourism experiences
• Sleep technology
• Digital tree experiences
Conscious Traveller
This is a trend towards
considering the impact of
travel on the environment and
considering opportunities to
offset the carbon footprint of
travel.
Part of this has been a rise in
train travel above taking short
haul flights, or a mix of flights
and train travel with new train
routes being developed or re-
instated. This is referred to as
locomotional travel. Examples
include: 
• Off grid accommodation and
longer stays
• Localism/shop local
• Increased train travel / train
experiences
• Eco-drive
Page 75 of 146

Page 76

10 
Distinctive Scotland
This is a trend towards drawing
on our rich history and heritage to
portray a unique and distinctive
visitor experience in Scotland.
The focus on the past has seen
a rise in storytelling to create
dark tourism experiences,
reading tourism referred to as
‘novolesiure’ and visits to specific
film locations. Examples include: 
• Dark tourism, drawing
on our dark history and
heritage
• Screen tourism and visiting
film locations
• Reading tourism and visiting
locations in literature
• Storytelling
• Nostalgia, revisiting
childhood places, passing
on positive memories
Changing Traveller
This trend has emerged following
the increase in flexible working
patterns post pandemic.
The line between business
and pleasure has become
increasingly blurred and
expectations are such that
accommodation providers are
looking to design their offering to
facilitate longer term stays, and
to provide seamless connections
between work and leisure
Examples include:
• Solo travel
• Workcations, combining
leisure & business
Page 76 of 146

Page 77

11 
Governance, Delivery & Reporting
The Perth and Kinross Tourism Strategy & Action Plan 2025–2035 will be delivered by Perthshire Tourism
Partnership and partners. Meetings will be held quarterly to monitor progress. The group will review the
action plan annually to ensure alignment to national and local strategies and a delivery report will be
published thereafter with an update on progress provided to the Perth and Kinross Economy and
Infrastructure Committee. 
While it is recognised that time and resources are already stretched, without coordination the combined
benefits of a partnership approach may struggle to be realised. The group will therefore continue
to consider options to support tourism leaders, and to realise the full potential of the local tourism
associations (LTAs), the collaborative groups, and their members.
Action Plan 
Area Promotion and
Destination Marketing
• No of day visitors
• No of overnight visitors
• Occupancy Levels
• Economic impact
• Visitors spend.
Investment and
Infrastructure
• Increase levels of
investment 
Market Development
and Internationalisation
• No of
international
visitors
• Visitors spend by
international
markets. 
Industry Growth and
Resilience
• KPI Total Employment
• Rate of start ups
• Business closures
Page 77 of 146

Page 78

12 
Pillar 1: Area Promotion and Destination Marketing
Objective: Aim to drive up visitation to our area from identified audiences, increasing day visitors and overnight stays, as well as
the length of stay and visitor spend 
ACTION LEAD PARTNER SUPPORT
Options appraisal for a delivery mechanism to deliver on a year-round Destination Marketing Strategy for leisure & business
tourism, considering costed options for delivery
Perth and Kinross Council
Develop a Destination Marketing Strategy to outline tactics and channels to improve communication with identified audiences, Perth and Kinross Council VisitScotland
promoting new tourism products and visitor experiences  
Review and refresh Perth and Kinross visitor audience profiles in line with national profiling data. Consider conducting a Perth and Kinross Council VisitScotland
Perthshire-wide visitor survey and consumer sentiment analysis  
Continue to support the development of Perthshire Box Office (PBO) which offers a centralised online, telephone and in-person Perth and Kinross Council Perth Theatre & Concert
ticketing service for the culture, heritage, and tourism sectors in Perth and Kinross, acting as a one-stop shop for all forms of event  Hall
booking  
Use awards, media credits and accreditations to acknowledge Perth and Kinross’s aim to be a ‘leading sustainable tourism Perth and Kinross Council VisitScotland
destination’  
Engage with businesses to strengthen the online discoverability of Perth and Kinross by increasing the digital capabilities of Perth and Kinross Council VisitScotland / Business
businesses. Engage with Online Travel Agents (OTAs) platforms to increase the number of businesses listed and distributing  Gateway
products/experiences online  
Engage with travel media, travel journalists, writers and influencers to amplify the profile of Perth and Kinross, building on the Perth and Kinross Council VisitScotland
newly created Perth City Narrative  
Develop and deliver on an ‘International Travel Trade Sales Action Plan’ focused on intermediary marketing (to include attendance Tay Cities Regional Tourism VisitScotland; VisitBritain;
at trade events, delivery of familiarisation trips, sales assets and new content creation) Development Group UK Inbound; ETOA; Coach  
Tourism Association
Continue regional collaboration through Tay Cities Regional Tourism Development Group comprised of Angus Council, Dundee Tay Cities Regional Tourism 
Council, Fife Council, Perth and Kinross Council and VisitScotland working together to promote Tay Country using the regional Development Group 
connector themes of food & drink, culture & creative and outdoor adventures  
Develop a model for the continued attraction of business events (meetings, incentives, conferences and events – MICE) into the Perthshire Business VisitScotland Business
area. Explore options such as the existing model, or a convention bureau-lite. Work with VisitScotland’s Business Events Team to Tourism Group (Meetings Events Team
showcase MICE-ready venues to buyers and to develop local ambassadors who can attract MICE events Perthshire) 
Develop a strategic approach to Perth and Kinross’s event portfolio (major, civic and community), to allow for the sustainability of Perth and Kinross Council VisitScotland
existing events (and maximising their local impact), identifying a pipeline of major events which Perthshire can bid for  
Maximise the opportunities of the UNESCO City of Craft & Folk Art designation and UNESCO Creative Cities Network to develop and Culture PK Perth and Kinross Council
promote craft experiences in the destination  
Explore the possibility of a Visitor Levy Scheme for Perth and Kinross Perth and Kinross Council 
Page 78 of 146

Page 79

13 
Pillar 2: Investment and Infrastructure
Objective: Aim to attract inward investment to enhance the visitor experience in the destination, as well as manage the impact on
our communities 
ACTION LEAD PARTNER SUPPORT
Support delivery partners with new rural and countryside access product developments, such as Perth and Kinross
Countryside Trust with development of infrastructure on the River Tay Way long-distance walking route, Cateran Trail, Snow
Roads and Drummond Hill (welfare facilities/signage and wayfinding, and interactive/educational interpretation)
Perth and Kinross Council Perth and Kinross
Countryside Trust
Deliver on the Strategic Tourism Infrastructure Development Plan which evidenced the need for inclusive and accessible visitor
infrastructure investment in Integrated Parking Development Solutions
Perth and Kinross Council Public, Private and Third
Sector Partners
Develop a series of designated investment areas in town centres in rural areas where there is an opportunity for regeneration
(following similar model of Perth City Centre Development & Design Framework)
Perth and Kinross Council Public, Private and Third
Sector Partners
Build on existing best practice models such as the River Tay Way Hub to develop a network of hubs which co-locate toilets /
accessible toilets / changing places toilet / showers / changing rooms / bike shelters / bike maintenance points
Perth and Kinross Council Perth and Kinross
Countryside Trust /
Various Delivery Partners
Develop a strategic waste disposal network up the A9 corridor for campervans/motorhomes in the area utilizing public/private
sector assets
Perth and Kinross Council PKC Waste Services
Team
Consider visitor management through a multi-agency approach at ‘hotspot’ areas and develop tactics to encourage dispersal
of visitors to lesser-known areas where there is capacity
Perth and Kinross Council PKC Visitor Management
Team / Economic
Development
Work with partners delivering active travel routes to improve active travel provision for visitors Perth and Kinross
Countryside Trust
PKC Transport Planning
(Mobility Strategy)
Explore on-demand transport services to start of key walks within Perth and Kinross to allow access to countryside without a Perth and Kinross PKC Transport Planning
car Countryside Trust (Mobility Strategy)
Support delivery partners such as Scottish Cycling with development of infrastructure for cyclists such as secure bike parking
facilities and route development building on the UCI Gran Fondo legacy
Scottish Cycling PKC Economic
Development Team
Explore the possibility of a Visitor Levy Scheme for Perth and Kinross Perth and Kinross Council 
Page 79 of 146

Page 80

14 
Pillar 2: Investment and Infrastructure
Objective: Aim to attract inward investment to enhance the visitor experience in the destination, as well as manage the impact on our
communities 
ACTION LEAD PARTNER SUPPORT
Capital investment programme to develop a series of designated investment areas in the City Centre where there is potential
to effect change, underpinned by a series of streetscape enhancements and property improvements. This includes works
within the Cultural Quarter, Mills Quarter and directly within the City Centre including developments to the vennels and lade
Perth and Kinross Council
Enhance operational services within the urban areas, maintaining and enhancing cultural and heritage assets. This aims to
cover services such as enhanced safety measures, enhanced cleansing, graffiti removal, lighting in vennels, and measures
towards environmental sustainability
Perth and Kinross Council 
Explore the possibility of a Visitor Levy Scheme for Perth and Kinross Perth and Kinross Council 
Page 80 of 146

Page 81

15 
Pillar 3: Market Development
Objective: Aim to build on investment to date in key assets, developing new tourism products and visitor
experiences 
ACTION LEAD PARTNER SUPPORT
Support and encourage collaboration and packaging of our tourism offer through closer working between businesses in food &
drink; culture & creative; and outdoor adventure sub-sectors
Perth and Kinross
Council
Perthshire Tourism
Partnership
Use the Perth and Kinross event portfolio as a catalyst for market development including supplier opportunities and new visitor
experiences at events
Perth and Kinross
Council 
Develop and deliver on an international travel trade sales action plan (to include attendance at trade events, delivery of FAM trips, Perth and Kinross Tay Cities Regional
sales assets and new content creation) Council Tourism Development
Group
Promote outdoor providers and guides who can offer reponsible specialist tours away from main tourist hotspots Perth and Kinross
Council
VisitScotland
Develop outdoor assets such as long distance walking and cycling trails eg the River Tay Way, Cateran Trail, and Perthshire Gravel Perth and Kinross Highland Perthshire
Trails. Work with partners to develop and sustain trails. Consideration to routes for adaptive cycling Countryside Trust Cycling; Tayside Trails
Association; Perth and
Kinross Countryside Trust
Develop outdoor assets for our waterways, such as access for watersports and clean waterways projects Paddle Scotland 
Develop bookable food & drink experiences through product development workshops, drawing on current tourism trends Regional Food Group
(Great Perthshire) 
Develop Perth and Kinross-wide food & drink itineraries or online guides for towns to promote foodie visitor experiences to
consumers
Regional Food Group
(Great Perthshire) 
Develop products for niche tour operators for cultural, craft, heritage, design, architecture, and conservation experiences
e.g. Jacobites Tour, Mythology Tour, Cultural Tour, Royal Connection Tour. This is with the aim of encouraging and increasing
international markets
Perth and Kinross
Council
Culture PK
Leveraging the UNESCO City of Craft and Folk Art designation, develop cultural/craft/creative tourism products and inclusive
visitor experiences which can contribute further to attracting identified audiences
Perth and Kinross
Council
UNESCO; VisitScotland
Explore and activate partnerships/opportunities with national arthouses/brands Tate, Jupiter Artland, and V&A Perth and Kinross
Council
Culture PK
Explore and activate partnerships with national agencies Creative Scotland, Museums & Galleries Scotland, and Traditional Arts &
Culture Scotland
Perth and Kinross
Council
Culture PK
Explore and create a programme of major cultural/craft/creative events the City can bid to host: UK City of Culture; Turner Prize;
Museums + Heritage Awards; Art Fund; immersive art experiences; and site-specific theatre
Perth and Kinross
Council
Culture PK
Explore the possibility of a Visitor Levy Scheme for Perth and Kinross Perth and Kinross
Council 
Page 81 of 146

Page 82

16 
Pillar 4: Industry Growth and Resilience
Objective: Aim to develop a sustainable visitor economy through supporting businesses to grow, increase levels of well paid jobs
and build their resilience in a challenging operating environment 
ACTION LEAD PARTNER SUPPORT
Develop and deliver sector-specific business support programmes which aim to enhance business resilience and performance Perth and Kinross Council Business Gateway /
(new product development, digital marketing, sustainability and inclusivity)  GrowBiz / Perth and  
Kinross Business  
Partnership
Support businesses with solutions to address issues specific to the tourism and hospitality sector e.g. limited transport in rural
areas affecting recruitment, lack of staff accommodation, shortage of available staff, and impacts of the domestic downturn due to
the cost-of-living crisis
Perth and Kinross Council Business Gateway /
GrowBiz / Perth and
Kinross Business
Partnership
Work with business support organisations/agencies to coordinate activities, minimising duplication of provision and achieving
reach to maximise participation
Perth and Kinross Council Business Gateway /
GrowBiz / Perth and
Kinross Business
Partnership
Create opportunities and platforms for peer-to-peer support for businesses who seek to influence change and shape the future of
tourism in Perth and Kinross, sharing ideas, best practice and knowledge
Perth and Kinross Council Business Gateway /
GrowBiz / Perth and
Kinross Business
Partnership
Support businesses impacted by domestic downturn with ways to sustain businesses year-round Perth and Kinross Council VisitScotland
Support communities with delivery of the tourism-related actions in their Local Action Groups & Community Action Plans (CAPs) Perth and Kinross Council PKC Funding Team
/ CLLD
Support volunteering/voluntourism. E.g. support Perth and Kinross Countryside Trust with educational events where PKCT deliver
training for staff and volunteers interested in countryside management / becoming Rangers
Perth and Kinross Council 
Explore the possibility of a Visitor Levy Scheme for Perth and Kinross Perth and Kinross Council 
Page 82 of 146

Page 83

Page 83 of 146

Page 84

Page 84 of 146

Page 85

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure Committee 
Date of Meeting: 28 May 2025 
Report Title: Review of Perth Harbour operations to support
‘Harbour Quarter’ and Inner River Tay developments 
Report Number: 25/130 
Report Author: Alan Dobson, Economic Development Officer 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to provide Members with an update on the review
of Perth Harbour operations to support the delivery of the ‘Harbour Quarter’
promoted as part of the Perth City Development and Design Framework and
wider Inner River Tay developments for leisure, tourism and nature. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Main Issues
4.  Impact and Value Assessment
5. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Agree to proceed with the option of a Harbour Revision Order (HRO) retaining
Statutory Harbour Authority and health and safety obligations excluding traffic
for commercial vessels over 24 meters and ceasing Competent Harbour
Authority duties in line with Transport Scotland (TS) suggestions. 
2.2 Ask the Strategic Lead – Economy, Development and Planning to report to
the Finance and Resources Committee any financial implications of the
review of Perth Harbour operations. 
7
Page 85 of 146

Page 86

2.3 Acknowledge the significant contributions made by the Harbour Board and its
dedicated members. Their efforts have been invaluable. However, given the
current circumstances, it is proposed that the Board is no longer necessary
and should be discontinued. 
3. Background/Main Issues 
3.1 Context 
3.1.1  Following the Council decision on 8th February 2023 (Report No. 23/42) to
close the Harbour to commercial traffic and pursue regeneration, officers have
been working with Transport Scotland (TS) to progress a Harbour Closure
Order for Perth Harbour. The Harbour Closure Order seeks to relinquish
Council’s obligations as Statutory Harbour Authority (SHA) and duties as
Competent Harbour Authority (CHA). 
3.1.2 On 4 September 2024, the Council (Report No. 24/241) approved the draft
City Centre Development & Design Framework for consultation and
engagement with the public and stakeholders and asked the Strategic Lead –
Economy, Development & Planning to bring back a revised version of the
Framework, incorporating suggested changes, for further consideration, along
with a delivery programme (Report ref 24/241). It is planned to submit a report
to the Council’s meeting on 10 September 2025. The Framework promotes
some large scale, potentially longer term, projects spread over several
development quarters including the Harbour Quarter. 
3.1.3 The Framework envisages a reimagination of the Harbour requiring some
long-term commercial leases to be bought out to create space for leisure-
based uses such as outdoor tourism-led and water-based activities, micro &
small businesses, and community facilities. A new bridge would connect the
Harbour to Moncrieffe Island and an opportunity for people to engage with
nature, to connect with greenspaces and to use active travel to travel to and
from the city centre. 
3.1.4 The Harbour Quarter is located within the Inner Tay area and will play an
important future role in supporting the existing Inner Tay Masterplan 2012-
2022 (currently under review by the Tay and Earn Trust and other
stakeholders). It is a vision strategy for the Tay area which promoted several
completed and ongoing projects under the themes of: Access and
Infrastructure, Leisure and Sport, Environmental and Cultural Heritage, and
Biodiversity. In addition, the Tay Adventures programme is included in the Tay
Cities Deal with several projects progressing with the Tay and Earn Trust to
deliver a rejuvenation of river assets within the Tay as a water-based leisure
destination. 
3.1.5 To support the delivery of the above vision, the first step was to cease
Council’s involvement and obligations to manage the harbour as a
commercial port. 
Page 86 of 146

Page 87

3.2 Review of Perth Harbour operations 
3.2.1 In February 2023, in addition to closure, the Council also agreed to market
Perth Harbour as a long-term lease opportunity for another operator. This
process concluded in September 2023, and although the Council agreed to
accept one submitted bid, the bidder subsequently withdrew from the process. 
3.2.2 In pursuing the closure of the Harbour, a prescribed Harbour Order process
must be followed to ensure legal robustness. The Harbour Order process is
outlined in the guidance published by TS on 5 February 2016 Guidance
05.02.2016 (transport.gov.scot). Appendix 1 summarises this guidance and
process, which was also detailed in the supporting documents submitted
alongside the February 2023 report to Council about the future of the Harbour
operations. 
3.2.3 A full timeline of discussions with TS since February 2023 is provided in
Appendix 2. Following prompts from elected members and the Strategic Lead
(Economy, Development & Planning) about the slow progress by TS on the
Harbour Closure Order process, a response was received from TS in
September 2024 indicating the complexity of the Harbour Order process and
the need to avoid legal challenges. TS indicated they were at the final stages
of the pre-consultation stage for the proposed Closure Order and would
initiate the formal 42-day consultation period soon. 
3.2.4 In October 2024, TS requested further information for Ministers/officials and
stakeholders to fully consider the merits of a Closure application. A meeting
was held on 6 November 2024 with TS Head of Ports and TS Head of
Maritime Policy, along with Council and legal advisers. TS highlighted
concerns regarding the obligations being relinquished and bylaw powers to be
retained. The Council agreed to provide the additional information requested
and stressed the need to reach a prompt conclusion. 
3.2.5 In early February 2025, TS hosted a session outlining their concerns around
safety and suggested a Harbour Revision Order as a more straightforward
method, alleviating several concerns, particularly regarding health and safety
risks. 
3.2.6 During this process and despite having virtually no commercial traffic, the
Council must continue commercial operations and maintain compliance with
legislation and guidance. In the year 2024/25, only one vessel docked in April
2024 and one in November 2024. The Council had also to support the main
commercial user to progress the new Border Control Point designation for
import of Products from Animal Origin (e.g. fishmeal) and submission of an
application for a dredging licence. Costs were incurred by the main
commercial user of the Harbour. 
3.2.7 Following the February 2023 Council’s decision, the 2023-24 budget allocated
to the Harbour was reduced from £170K to £13K targeting a saving of £157K.
However, the Council continued to incur costs to remain open and compliant
creating a budget pressure. An actual net expenditure of £208K was reported
as of 31 March 2024. The projected net expenditure as of 31 March 2025 is
estimated at around £100K, depending on potential income from vessels. This
Page 87 of 146

Page 88

expenditure includes the legal fees due to ongoing Order proceedings with
respect to the closure. Overall, a saving of £57K has been achieved from the
original target savings of £157K. Through a review of needs and in line with
the Council decision, the Council also agreed to the sale the Fair Maid
tugboat which raised £500K in 2023-24. 
3.3 Proposals 
3.3.1 At the Finance & Resources Committee meeting on 5 February 2025, the
Strategy Lead (Economy, Development & Planning) suggested exploring the
option of a Harbour Revision Order rather than a Harbour Closure Order in
line with TS suggestions. as the HRO process is likely to be simpler and more
manageable. 
3.3.2 This option will still implement the February 2023 Council’s decision to close
the harbour to commercial traffic and to focus on leisure activities, supporting
the delivery of the ‘Harbour quarter’ as promoted in the City Centre
Development and Design Framework. 
3.3.3 Under this option, the Order would remove the Council’s Competent Harbour
Authority (CHA) duties with the continuation of its Statutory Harbour Authority
(SHA) and related Health and Safety obligations. The Council has sought its
own legal advice on the matter, detailed in Appendix 3. Legal advice
confirmed this would be an approach with some pros and cons. 
3.3.4 The SHA obligations would reduce in tandem with the reduction of harbour
operations due to the cessation of traffic of commercial vessels over 24
metres. This option would retain powers by the Council as SHA. 
3.3.5 Whilst the most effective way to reduce obligations would be to advance the
closure order, which would relieve the Council of more responsibilities. Our
legal advisers have pointed out another risk: alongside the full closure order,
PKC would need to initiate a separate legal process to amend the relevant
bylaws, which would also require ministerial approval. 
3.3.6 As the landowner, the Council would need to implement processes to address
post-closure activities. Maintaining the SHA would not significantly burden the
Council compared to implementing safety protocols for closure. 
3.3.7 TS suggests proceeding with the Harbour Revision Order (HRO) rather than
the Closure Order. The HRO process is likely to be simpler and more
manageable for us but also facilitates future leisure activities and allows the
Council to retain the necessary powers at the Harbour. This process is still
subject to objections. This process could still take 6-18 months to complete
depending on the results of the consultation. 
3.3.8 The Committee is asked to agree to proceed with the option of a Harbour
Revision Order retaining Statutory Harbour Authority and health and safety
obligations excluding traffic for commercial vessels over 24 meters and
ceasing Competent Harbour Authority duties in line with TS suggestions. 
Page 88 of 146

Page 89

3.3.9 In preparation for the public consultation, the Council has met and will
continue to meet with key stakeholders to explain plans and address possible
objections. These stakeholders include The Northern Lighthouse, NatureScot,
Forth Ports (Dundee), Crown Estates, Ineos, Shell (pipeline owners), Amey,
River Leisure Users and main commercial harbour user. 
3.4 Responsibilities and Costs post Harbour Revision Order 
3.4.1 The Council would remain a Statutory Harbour Authority for Perth Harbour
with a Harbourmaster who could use its powers of directions and of control to
facilitate future leisure activities and the delivery of the ‘Harbour Quarter’ as
promoted in the City Centre Development and Design Framework. The overall
risks would reduce due to the cessation of large commercial traffic. 
3.4.2 Duties associated with being a Competent Harbour Authority including
pilotage would cease. Responsibilities associated with dredging, equipment
maintenance (e.g. Aids to Navigation), and general SHA burdens, would
diminish or cease. 
3.4.3 Commercial properties related to large commercial traffic could find new uses
including business and community uses or land could be released for new
connections to Moncrieffe Island supporting the development of the ‘Harbour
Quarter’. Stronger or new synergies could be developed between Perth
Harbour basin and Willow Gates and along the Inner Tay due to the cessation
of large commercial traffic. 
3.4.4 However, the Council would continue to incur costs. The future total budget is
estimated at £65K. This would include the already budgeted £13K and an
additional £52K. These costs are detailed below: 
- Rent and Rates: Covered by the current budget of £13K, likely to remain
the same. A review could reduce them. 
- Designated Person (DP): Required by the UK Port Marine Safety Code
(PMSC) to provide independent assurance of marine safety management.
The Council will need a DP, but a review of scope and costs would be
initiated to keep costs to a minimum. 
- Harbourmaster & Operations: Includes a qualified Harbourmaster to
ensure compliance with the Port Marine Safety Code, relevant insurances,
and Personal Protective Equipment (PPE) servicing. The role and costs
would be reviewed considering reduced responsibilities. The role could
also include wider engagement activities to support leisure use possibly in
partnership with other river users or organisations. 
- Asset Maintenance: Maintenance and phased decommission of Aids to
Navigation, Safety Equipment, and assets like fencing. 
- Oil Spill Cover: Contract for oil spill response. Cover and costs would be
maintained but reviewed considering reduced risks.
Page 89 of 146

Page 90

- PPE: Replacement and repair of personal protective equipment. 
- Website: Maintenance for port, harbour, and river information as the new
model is developed. 
3.4.5 The estimated budget pressure at approximately £52K per annum would
mean that the Council would still have achieved a budget saving of around
£100K from its original 2023-24 budget saving target of £157K. This ongoing
estimated budget pressure would need to be reported and considered by the
Finance and Resources Committee. Whilst difficult to get a replica market
comparison, a non-commercial shipping conservancy contract for the River
Dee totals £600k over four years, although this included a lighthouse. 
3.4.6 The current Council’s Scheme of Administration states that the Economy and
Infrastructure Committee is to exercise the strategic and policy functions of
the Council in relation to harbours, piers, boatslips and jetties in terms of
Section 154 of the Local Government (Scotland) Act 1973 and all relevant
subordinate legislation, including the section of the River Tay over which the
Council is Navigation Authority. The Scheme also states that the role of the
Strategic Lead – Economy, Development and Planning is to exercise the
functions of the Council in terms of Section 154 of the Local Government
(Scotland) Act 1973 and all relevant subordinate legislation in relation to Perth
Harbour. This should be maintained but may have to be reviewed post
Harbour Revision Order. 
3.4.7 A Harbour Board was set up following the approval of the first Harbour
Business Plan by the Council on 18 May 2016 (Report no 16/222 refers). The
Harbour Board was not set-up as a sub-committee within the Scheme of
Administration, but as an advisory Board with an Officer acting as the Harbour
Duty Holder. With the approval of the second Business Plan in 2021, it was
noted that, since the first business plan and over time, the Board’s role has
evolved. As such, the Board has taken on more responsibilities and acted
more as the Harbour Duty Holder, providing strategic direction, public
representation and ensuring compliance with the Port Marine Safety Code
(PSMC) (Report No 21/150 refers). The Harbour Board last meeting was in
November 2023 and has not met since and the Harbour Duty Role has been
provided in line with the Scheme of Administration. 
3.4.8 Throughout these years, the Harbour Board and its dedicated members have
been pivotal in tackling the various challenges faced by the Harbour. Each
successive chair and member approached their roles with unwavering
passion and commitment, making a significant impact. Their efforts have truly
made a difference. 
3.4.9 The Committee is asked to acknowledge the significant contributions made by
the Harbour Board and its dedicated members. Their efforts have been
invaluable. However, given the current circumstances, it is proposed that the
Board is no longer necessary and should be discontinued. 
Page 90 of 146

Page 91

4.  Impact and Value Assessment 
Review_of_Perth_Harbour_Operations_to_support_Harbour_Quarter_and_In
ner_River_Tay_Dev.pdf 
5. Appendices 
5.1 Appendix 1 – Summary of guidance and process of a prescribed Harbour
Order
5.2 Appendix 2 – Timeline of Activity
5.3 Appendix 3 – Harbour Legal Advice Update 
Page 91 of 146

Page 92

Page 92 of 146

Page 93

APPENDIX 1 
What is a harbour closure order?
This does not mean that a harbour will physically close or cease to exist, but it does
mean that a harbour authority would be relieved of its statutory duties and will no
longer be classed as a statutory harbour authority (SHA). It may mean that the way
people use the harbour area has to change. 
Why would a statutory harbour authority apply for an Order? 
A SHA may wish to be relieved of its statutory functions, where the harbour is no
longer viable, commercially or otherwise, because of: 
- a change in the local economic area;
- physical restrictions in terms of the size of ships that can access its
facilities;
- a drop in the number of vessels using the area;
- not being able to compete with other local ports;
- a change in the type of vessels using the area. 
If a harbour is not viable then the harbour authority may not be able to fulfil the duties
or meet the costs imposed on it by its statutory functions. This may cause dis-
benefits to the SHA and those using or considering using the harbour. 
What should a statutory harbour authority consider before applying for a
closure order? 
There are three kinds of duties a harbour authority has: statutory duties, imposed
either in the local legislation for that authority or in general legislation; general
common-law duties; and fiduciary duties. 
The order will only remove the statutory duties; the other two kinds of duties may still
exist for the SHA. If the former SHA remains the owner of the infrastructure they will
retain the responsibilities associated with ownership. 
The first step for the harbour authority is to ensure that it is aware of its local duties
and the powers, policies, systems and procedures that they have in place. This is to
ensure that nothing is removed unintentionally. The SHA should review the powers
in its local legislation including those incorporated from other enactments. These
may include powers to make byelaws or give directions either general or special and
to manage and maintain the harbour. Some of the powers may derive directly from
the Harbours Act 1964. 
If a SHA, taking into account the above, is considering giving up its statutory
functions, which includes its enforcement powers then it is recommended that it
consult informally with users and anyone with an interest in the harbour. An SHA
considering relinquishing its powers should also bear in mind that the Porth Marine
Safety Code also applies to non-statutory harbours. 
7
Page 93 of 146

Page 94

A SHA will need to state who may take over their role in various matters for example: 
- Lighting and buoying responsibilities - under Part VIII of the Merchant
Shipping Act 1995 (MSA95) each SHA is the local lighthouse authority for
its area (section 193, as amended) and under section 198 of that Act a
local lighthouse authority may be directed by the general lighthouse
authority (the Northern Lighthouse Board in Scotland) to lay down buoys,
or alter lighthouses, buoys and beacons in its area. The future
responsibility for any lights or buoys should be discussed with the NLB.
- Oil pollution - section 137(2)(d) of the MSA95 enables the Secretary of
State to give direction to a SHA as respects ships or cargoes where an
accident has occurred in a harbour.
- Wrecks – section 252 of MSA95 provides a power where a vessel is sunk,
stranded or abandoned in or near to the approaches of a harbour so that it
is, or is likely to become, a danger to navigation to take possession or,
raise, remove or destroy the vessel, to light and buoy it until raised or
destroyed and to sell and reimburse the authority from the proceeds of
sale.
- Pilotage - A Competent Harbour Authority (CHA) is a statutory harbour
authority (SHA) with duties to assess the need for pilotage and powers to
provide the appropriate pilotage services and impose pilotage directions
as necessary to secure the safety of ships navigating in their waters. A
CHA for an area where pilotage is no longer considered necessary may
wish to be relieved of the functions. The removal of pilotage functions from
harbour authorities would relieve them of their powers and duties relating
to pilotage under the Pilotage Act 1987 (“the 1987 Act”). A harbour
authority from which such functions were removed would cease to be a
CHA, but would continue to be an SHA unless a closure order was also
sought. Provisions enabling this to be done came into force with the
commencement of section 1 of the Marine Navigation Act 2013 in October
2013. 
The application process is as follows: 
Section 17D and Part 1 of Schedule 3 of the 1964 Act set out the procedure that
harbour authorities must follow before applying. 
Pre-application: Anyone intending to apply for a harbour closure order should
contact Transport Scotland prior to making an application to ensure they are aware
of what should be included in their statement and draft closure order. 
Consulting other organisations: Authorities are encouraged to consult other
relevant stakeholders and those organisations and persons likely to be affected by
the proposals prior to making the application. 
Public notices: Once a SHA has submitted its application, it must arrange for a
notice of that application to be placed in the Edinburgh Gazette and for two
consecutive weeks in one or more local newspapers. A 42-day period for objections
and representations will then begin from the date of the first published notice.
Page 94 of 146

Page 95

Transport Scotland will discuss and agree the content of these notices prior to
publication. 
Consultation process: At the same time as the advert appears in the newspapers
Scottish Ministers will consult such bodies as it considers appropriate. Each
consultee will be given a 42- day period to respond which may run concurrently with
the public notice period. Typical consultees may include: 
- Ports industry bodies 
- Scottish Environment Protection Agency 
- Maritime and Coastguard Agency 
- Northern Lighthouse Board 
- Neighbouring local authorities 
- Neighbouring harbour authorities 
- Chamber of Shipping 
- Royal Yachting Association 
The list of consultees will be notified to the authority who will be required to provide
each consultee with a copy of their application documents. 
Registering an objection or representation: Organisations or individuals wishing
to object to or make a representation about a harbour order must do so within the
42-day statutory period allowed for objections and representations. 
Resolution of objections: Where objections to a harbour closure order are made,
the authority will be allowed a period to negotiate with the objectors with a view to
resolving the objections. The length of this period will be agreed with the authority if
required. 
Written representations: Where there are outstanding objections and efforts to
resolve them have been unsuccessful, Scottish Ministers will make a decision on
how best to proceed with the application and this may include a process of written
representations or in very contentious cases a public inquiry or hearing. 
Scottish Ministers’ decision: Once Scottish Ministers have taken the decision on
whether or not to make the closure order, they will notify the authority, consultees
and any objectors and publish the decision on the Transport Scotland website. The
authority must publish a notice in the Edinburgh Gazette and local newspaper
stating: 
- that the harbour closure order has been made 
- where a copy of the order can be viewed 
- when the order comes into operation 
- the procedure to challenge the validity of the order. 
Page 95 of 146

Page 96

Page 96 of 146

Page 97

APPENDIX 2
Timeline of activity 
8 February 2023 – Council chooses option 5 as preferred option for Perth Harbour.
The cessation of involvement and obligations to manage the harbour as a
commercial port. Council instructed Executive Director (Communities) to seek
approval for a Harbour Revision Order. Also instructed that in recognition of the
length of time this would take officers should test the market for interest in a potential
long lease opportunity. 
9 February 2023 – Transport Scotland informed of decision of Council. At that time,
they indicated that the average timescale for a simple Harbour Revision Order being
decided was six months. However, they advised that this was not guaranteed and
recommended that officers sought legal advice on behalf of the Council. 
20 February 2023 – meeting with Transport Scotland to discuss process and the
impact of carrying out marketing for interest in long lease opportunity. Following the
meeting agreed that while both processes could run in parallel the Harbour Revision
Order process to close to commercial traffic could only start once the marketing
process was completed. Transport Scotland also encouraged pre-consultation with
key stakeholders ahead of the formal processes. Regular updates on progress
against the timeline below provided to Transport Scotland throughout February to
September 2023. 
27 February 2023 – first meeting with specialist external legal advisors. Regular
meetings have taken place since. A commercial traffic closure plan as well as a draft
Harbour Revision Order were developed with the legal adviser, as well as a checklist
for any parties interested in the long lease opportunity. 
16 May 2023 – formal marketing of the long lease opportunity for the Harbour began. 
18 May 2023 – 14-day pre-consultation launched with key stakeholders on both the
Council’s intentions to promote a Harbour Revision Order to close commercial traffic
and the long lease opportunity. One-to-one meetings were also organised with
stakeholders such as the Northern Lighthouse Board. 
June 2023 – the draft commercial traffic closure plan, draft Harbour Revision Order
and the results of the pre-consultation were shared with Transport Scotland to allow
them to share with their own legal advisers for comment. 
12 June 2023 – closing date for expressions of interest to be submitted for long
lease of harbour. One expression of interest received, which was non-compliant.
Bidder given the opportunity to submit a revised compliant bid by 30 June. 
30 June 2023 – revised compliant bid received which was assessed against the
requirements stated in the particulars. 
30 August 2023 – in private session decision of Council to accept the bid with the
exception of the sale of the Fair Maid tugboat at nil value. 
8 September 2023 – bidder decided to stand aside from the process. 
7
Page 97 of 146

Page 98

12 September 2023 – request to Transport Scotland for a meeting to progress the
draft Harbour Revision Order submitted in June 2023. Advised that they had not yet
received legal advice and were unable to provide feedback. Several subsequent
requests for a meeting made with the same result. 
4 December 2023 – in light of no feedback being provided by Transport Scotland,
decision made to progress by formal submission application for Harbour Revision
Order. 
7 December 2023 – Transport Scotland acknowledged formal submission but
requested further information. 
9 January 2024 – the requested further information was provided to Transport
Scotland. 
31 January 2024 – Transport Scotland advised that due to the many factors they
needed to consider for this application and the fact they are currently experiencing a
heavy workload, they were not in a position as yet to give full feedback. 
5 March 2024 – David Littlejohn, Strategic Lead – Economy, Development and
Planning wrote to the Interim Director of Transport Scotland to express concerns
about the slow progress. Reply received indicated that Transport Scotland aim to
work closely with all prospective applicants to ensure any final application and
subsequent order is robust, both legally and from a policy perspective. It is also
highlighted that they are currently dealing with an unprecedented number of Harbour
Order applications and that these are being progressed as quickly as possible. 
8 March 2024 – meeting took place with Transport Scotland to review information
provided and to agree how to progress public consultation as soon as possible.
Following the meeting updated information was provided. 
4 April 2024 – Council provided additional information and submitted the latest
version of the HRO with supporting documentation following requests from TS for
further information. This latest iteration draws on valuable insights from Scottish
Enterprise, emphasising their stance on the Harbour’s economic viability concerns.
All requested information including updated risk assessment were included within the
revised submission as requested. 
15 May 2024 – Council completed amendments suggested by Transport Scotland on
the public notice wording template and submitted. Transport Scotland confirmed that
a formal letter with the list of stakeholders would be sent. 
3 June 2024 –Transport Scotland apologised for not sending the formal letter and
highlighted they were still working on the wording of the public notice. Transport
Scotland then requested confirmation on land acquisition. Council confirmed this
proposal did not involve the acquisition of any land. 
20 June 2024 – A replacement tracked version of the public notice requiring further
review is received from Transport Scotland. Solicitors from Council and Transport
Scotland back and forth 
Page 98 of 146

Page 99

30 July 2024 – Council agreed with all amendments to the public notice wording.
Awaiting confirmation to publish. 
30 August 2024 – Letter from Cllr Laing writing to express our concerns regarding
the uncertainty surrounding the timescale for processing our Harbour Revision Order
application for Perth Harbour. 
25 September 2024 – Following reminders, a response letter was received from
Transport Scotland on 25th September. This letter highlighted the complexity of the
process and that our application required a more detailed consideration. Transport
Scotland needed to ensure that an Order is proportionate, achieves what it sets out
to do, provides adequate opportunity for all those impacted by its aims to provide
views and is best insulated from potential legal challenge once the Order has been
established. Transport Scotland indicated that the pursuance of a Closure Order for
a functioning harbour has not occurred previously in the UK, making this a more
complex and novel request. Nonetheless, Transport Scotland indicated that they
were now at the final stages of the pre-consultation stage for the proposed Closure
Order and would initiate the formal 42-day consultation period as soon as possible. 
25 October 2024 – Without warning, Transport Scotland sent an email requesting
further information for Ministers/officials and interested stakeholders to be able to
fully consider the merits of a Closure application. Council immediately sought a
meeting to discuss the content of the email which took place on 6th November.   
6 November 2024 - Session with Martin Ritchie (Head of Ports) and Nick Gosling
(Head of Maritime Policy) from Transport Scotland and Council and Council’s legal
advisers. Transport Scotland highlighted their concerns regarding the obligations
being relinquished and bylaw powers to be retained. They reiterated the novelty of
the request in the UK and certainly in Scotland as well as for their team. Council
agreed to provide the additional information requested. Council stressed again the
need to reach a conclusion. 
2 December 2024 - With the support of our legal adviser, the current bylaw position
and statutory duty position that supports all the harbour plans and mitigations to date
has been finalised and sent to Transport Scotland and the Scottish Ministers for
review. Along the information, a letter stating the serious concerns from Council
elected members and Chief Executive about the uncertainty of the timescale for a
decision and the financial pressures this imposes on the Council’s already
challenging financial position. An offer of a direct contact between Council legal
advisers and Transport Scotland legal advisers was also offered to avoid any further
delays. 
19 December 2024 – TS respond to our updated bylaw and statutory duty position
that supports all the harbour plans, mitigations and questions to date. TS are seeking
further detailed information on all statutory functions in respect of the harbour or
specified statutory functions in respect of the harbour closure before publication and
consultation. PKC set another meeting with TS to ascertain the specified statutory
functions to be detailed. 
Page 99 of 146

Page 100

13 January 2025 - Confirmation of Border Control Post/ Designation Expansion –
Perth. Application submitted on the 13 July 2021, to expand the Border Control Post
(BCP) designation facilities at Perth. The information submitted contains evidence
demonstrating that the current construction of the Border Control Post has met
required criteria for the additional commodities to be authorised. Perth Harbour is
designated as a border control post for the purpose of performing official controls on
the commodities as of the 13 January 2025 for the following commodities: • Product
of Animal Origin (POA) Not of Human Consumption – Bulk Fishmeal 
21 January 2025 – Legal team and officer discussion around the obstacles on the
alternate legal basis for PKC to monitor use of the harbour and how TS have been
requiring yet further detailed information. This risk assessment on legislative change
will be the first in Scotland and the new statutory provision is proving time consuming
and challenging to progress. Reframing the order to retain some duties as the
Statutory Harbour Authority was discussed and decided to be explored as a proposal
to take HRO to TS to solve the gridlock. 
5 February 2025 – After further discussion with legal support, TS hosted a session
outlining their concerns around safety and their current challenges. The HRO would
be a more straightforward method for order processing, alleviating several concerns,
particularly regarding health and safety risks. Using the same process as current
HRO, we agreed to submitting with SHA H&S obligations and will not require SG to
approve something unique. Powers will be retained by PKC as SHA, no requirement
to change bylaws that would have required further legal work and additional
ministerial approval. A statement by the Strategic Lead (Economy, Development &
Planning) was made at the Finance & Resources Committee meeting informing
members of difficulty and complexity of the process and recommended to explore
this new option. 
30 March 2025 - Operations update includes repair of ISPS fence (International Ship
and Port Facility Security Code) and the contract for OPRC (Oil Pollution
Preparedness, Response and Co-operation). Updates to the Safety Management
System (SMS) from the Full Compliance Audit Report issued October 2025. There
was an import and export of Fishmeal by the Ceg Galaxy. At the beginning of the
month, a capital dredge application was submitted to Marine Scotland on behalf of
Calport for a license. 
15 April 2025 - Transport Scotland and the relevant legal teams reviewing update
HRO submission pre consultation. Operations updates include the midterm PMSC
(Port Marine Security Code) during April. The ISPS Audit will start with evidence
gathering in April and the report is expected in May. 
Page 100 of 146

Page 101

APPENDIX 3
HARBOUR LEGAL ADVICE UPDATE 
PKC progress a Harbour Revision Order to remove CHA duties and commercial
vessel over 24 meters. 
PKC can remove Competent Harbour Authority (CHA) duties with the continuation
of Statutory Harbour Authority (SHA) obligations. These SHA obligations would be
reduced with the role of the harbour reduced by limiting commercial vessels over 24
metres. Legal advice confirmed this would be an approach with some pros and cons: 
Pros
• Uses the same process as current HRO
• Clear Health & Safety obligations and will not require Scottish Ministers to
approve something unique.
• Legal advice and order could be prepared - the order does not require much
change from the current order process
• Powers will be retained by PKC as SHA
• No need to change bylaws (which would require further legal work and
ministerial approval)
• Once progressed another HRO could also reinstate a CHA, if required. 
Cons
• As SHA, the Council still retain the obligations of SHA and advised to comply
with the Port Marine Safety Code (PMSC see terms below). These obligations
would align with the activities at the harbour and allow for some flexibility.
• Harbour master function would still exist
• Abolishing the SHA would be the most effective solution to significantly lessen
total obligations. 
Whilst the most effective way to reduce obligations would be to advance the closure
order, which would relieve PKC of more responsibilities. Legal pointed out another
risk: alongside the full closure order, PKC would need to initiate a separate legal
process to amend the bylaws, which would require ministerial approval.
As the landowner, PKC would need to implement processes to address post-closure
activities. Maintaining the SHA would not significantly burden PKC compared to
implementing safety protocols after closure. 
Terms 
The Port Marine Safety Code (PMSC)
The Port Marine Safety Code (PMSC) is a set of guidelines and standards designed
to promote safety within the maritime industry, particularly in the context of ports and
harbours. The purpose of the Port Marine Safety Code is to enhance safety
management practices, ensuring the protection of people, property, and the
environment.
7
Page 101 of 146

Page 102

Key aspects and objectives of the Port Marine Safety Code include:
• Risk Management – The code emphasizes the importance of risk assessment
and management. Ports are encouraged to identify potential hazards, assess
associated risks, and implement measures to mitigate those risks effectively
• Safety Management Systems (SMS) – The PMSC encourages the
establishment and implementation of Safety Management Systems by port
and harbour authorities. These systems help ensure a systematic and
organised approach to safety, including clear procedures, communication,
and monitoring
• Continuous Improvement – The code promotes a culture of continuous
improvement in safety performance. Ports are encouraged to review and
enhance their safety practices regularly, learning from incidents and near
misses
• Legal Compliance – Ports are expected to comply with relevant national and
international maritime laws and regulations. The PMSC provides a framework
to assist ports in meeting these legal obligations
• Communication and Coordination – Effective communication and coordination
among all stakeholders, including port authorities, port users, and emergency
services, are crucial for ensuring a comprehensive approach to safety
• Training and Competence – The code stresses the importance of training and
maintaining the competence of personnel involved in port operations. This
includes harbour masters, pilots, and other staff responsible for safety-critical
tasks
• Emergency Preparedness – Ports are encouraged to develop and maintain
emergency response plans, ensuring readiness to respond promptly and
effectively to incidents that may pose a threat to safety. 
While compliance with the Port Marine Safety Code is voluntary, ports and harbours
that adhere to its principles demonstrate a commitment to high standards of safety
management. The code serves as a valuable tool for fostering a safety-conscious
culture within the maritime industry, contributing to the overall well-being of those
involved in port activities and the protection of the marine environment. 
Competent Harbour Authority (CHA) and Statutory Harbour Authority (SHA)
refer to different types of harbours and ports each having distinct powers and
responsibilities. 
Competent Harbour Authorities focus more on operational management without
explicit statutory power, whereas Statutory Harbour Authorities are vested by law
with specific regulatory and enforcement capabilities. 
A CHA is typically defined by its ability to oversee the operation, maintenance,
and development of a port or harbour. Their powers often include: 
- Health and Safety Oversight   
- Environmental Management   
- Vessel Movements: Authority over the navigation and berthing of vessels within
the harbour.
Page 102 of 146

Page 103

- Port Development: Decision-making related to infrastructure improvements and
expansions. 
CHAs may not have statutory powers but can operate under various maritime laws
and regulations, giving them the authority to act on behalf of the port community.
SHA is established by legislation and has specific statutory powers granted by
law. Their key powers typically include:   
- Legal Authority Empowered to impose legal obligations on users within the
harbour.   
- Regulatory Enforcement: Authority to enforce compliance with local, national, and
international maritime laws.   
- Charges and Fees: Ability to set and collect fees for the use of harbour facilities
and services.   
- Safety Regulations: Legal responsibility to ensure safety standards and conduct
inspections of vessels and operations. Transition to the new operating model:
Currently, while PKC is implementing changes to harbour obligations and activities at
the harbour to close commercial traffic; the port is operating in a compliant manner
and maintaining business as usual. Although some of the burden on operations from
the previous contract between Perth Harbour and CalMac contract has decreased,
there are still significant pressures to remain compliant. 
PKC is currently navigating through just under 150 distinct duties and obligations.
These responsibilities are defined under a variety of key documents and legislative
frameworks, which include: 
• Good Practice Guide / Port Marine Operations,
• Harbours Act 1964,
• Marine Navigation Act 2013,
• Port Marine Safety Code. For all UK Harbour Authorities and other marine
facilities, berths and terminals.
• Scottish Outdoor Access Code 2005.
• Lease 1990-01-05
• Pilotage Act 1987
• Perth and Kinross Council (Port Marine Safety Code) Safety Management
System Policy Document 
Page 103 of 146

Page 104

Page 104 of 146

Page 105

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy & Infrastructure Committee 
Date of Meeting: 28 May 2025 
Report Title School Exclusion Zone Programme 
Report Number: 25/131 
Report Author: Daryl McKeown, Senior Engineer, Traffic & Network 
Organisational Lead: Fraser Crofts, Strategic Lead Environment &
Infrastructure 
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this Report is to provide an update on the effectiveness of
school exclusion zones in Blairgowrie, Guildtown, Kinloch Rannoch and Perth,
to propose additional pedestrian facilities at Blairgowrie and Perth, and to
recommend changes at the Viewlands zone in Perth to encourage better
compliance with the access restriction. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6. Conclusion
7. Impact and Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the effectiveness of the school exclusion zone programme within a
defined road environment. 
2.2 Approves the creation of permanent Traffic Regulation Orders for school
exclusion zones at Blairgowrie Community Campus and at Guildtown,
Inchview and Kinloch Rannoch primary schools. 
8
Page 105 of 146

Page 106

2.3 Approves the creation of an Experimental Traffic Regulation Order to trial an
exclusion zone at Tulloch Primary School. 
2.4 Agrees to public consultation on changes to the Viewlands school exclusion
zone to encourage better compliance. 
2.5 Approves the provision of the additional measures to improve pedestrian
facilities around Blairgowrie Community Campus and at Guildtown, Tulloch
and Viewlands primary schools, and the removal of the school exclusion zone
from the old Balhousie Primary School site, subject to consultation and
available budgets. 
2.6 Approves the implementation of a communications strategy to promote each
school exclusion zone. 
3. Background/Context 
3.1  In 2016, Perth & Kinross Council undertook a successful trial of the school
exclusion zone (SEZ) access restriction on streets around four primary
schools – Arngask (Glenfarg), Burrelton, Coupar Angus and Luncarty.  The
Arngask and Burrelton sites were accommodated within the existing road
network.  Running parallel with the Coupar Angus and Luncarty SEZ projects
was the upgrading of pedestrian facilities in the form of new footpath links.   
3.2 The Council was responding to road safety concerns from schools, parents
and residents about traffic levels at the school gates.  There were two
objectives to installing the school exclusion zones – (i) to reduce congestion,
and the associated road safety risk, at the school gate and (ii) discourage
dependence on vehicular transport by enabling people to walk to and from
school.   
3.3 The school exclusion zone is an access restriction, rather than a parking
restriction.  Vehicles are not permitted to drive in, out or around the school
streets when the scheme is in operation.  Signs are located at the entrance to
the schemes which have flashing amber beacons to indicate when the
scheme is in operation.  Only those vehicles displaying a valid permit are
exempt from the access restriction.  Vehicles parked within the zone without a
permit are entitled to remain but cannot move until the operating time finishes. 
3.4 As a school exclusion zone is an access restriction, entering the restricted
area without a valid permit is a traffic violation and a matter for Police
Scotland.  Similar to speed limits, local roads authorities can introduce such
restrictions but enforcement remains the responsibility of the Police.  From the
start of the project, Police Scotland stated they would not routinely enforce the
school exclusion zones but would respond to school or community concerns
as resources permit.   
3.5 In 2022, Perth & Kinross Council introduced additional school exclusion zones
at nine schools, covering six sites, as part of our Spaces for People (SFP)
programme.  The SFP funding from the Scottish Government was to facilitate
increased pedestrian activity during the early stages of the Covid pandemic. 
Page 106 of 146

Page 107

The additional schools were being introduced as part of a trial using a
Temporary Traffic Regulation Order.  These new school exclusion zones
covered streets around the school campuses at Balhousie, Guildtown,
Inchview, Kinloch Rannoch, Newhill/St. Stephen’s, Viewlands/Fairview/Perth
Academy.  A further site at Tulloch Primary School was deferred until
improvements have been made to the road infrastructure for pedestrians. 
3.6 The original 18-month TTROs were permitted to be extended by the Scottish
Government to 24-months.  This was largely because of the high number of
new TTROs introduced across the country by Local Authorities during the
Covid pandemic and the length of time it would take to assess and process
them to full TROs.  These TTROS have now expired which means the access
restrictions cannot be enforced.  Police Scotland retain a visible presence
around the schools as an ongoing deterrent.   
4. Main Issues 
4.1 Balhousie Primary School was the site that experienced most compliance. 
The school was located at the end of a short cul-de-sac, with limited frontage
development resulting in no through-traffic and low residential traffic.  The
entire school role resides within the catchment area so there was limited
parent/carer traffic.  This road environment is the ideal model for a school
exclusion zone.  Although the school has now closed, and the pupils
transferred to Riverside Primary School, this trial zone has provided the
Council with the most beneficial study site. 
4.2 The school exclusion zones at Guildtown, Inchview and Kinloch Rannoch also
lie on short no-through roads with limited traffic, as do the original Arngask
and Burrelton zones.  Compliance at each site varies but is generally good. 
There have been regular complaints about poor compliance by a small
number of drivers and requests for enforcement at Inchview, and occasional
complaints about unauthorised traffic at Guildtown and Kinloch Rannoch. 
There have been no requests to have these zones amended or removed.   
4.3 At the Blairgowrie Community Campus, the access restriction covers several
individual streets which are adjacent to the campus and connected by
pedestrian accesses.  Initially, school traffic migrated from these excluded
streets to the adjacent public road network.  It was agreed with the Ward
Councillors, the Community Council and the Parent Council to introduce
waiting restrictions around the road junctions on the periphery of the school
exclusion zones site in order to prevent obstructive parking.  Electronic signs
were installed on Elm Drive but not activated as the beginning of the school
exclusion zone project coincided with building of the new houses and link
road.  Once completed, Elm Drive would become a local distributor road, as
initially planned, and unsuitable for any access restriction. 
4.4 A Park & Stride site has recently been constructed on Hazelwood Road which
provides a continuous pedestrian link to the school without pupils having to
cross a public road.  Travel patterns and traffic volumes in the area have
increased with the opening of the new retail park on Perth Road and the (still
to be adopted) link between Hazelwood Road and Elm Drive.  It is likely that
Page 107 of 146

Page 108

an additional school exclusion zone will be required on the new housing
development next to the school but this will continue to be monitored. 
4.5 The Viewlands school exclusion zone, covering Viewlands Primary School,
Fairview School and Perth Academy has been problematic from the outset. 
Pupils at Fairview are taxied to the school so their transport is exempt from
the access restriction.  The Academy has a larger catchment area but those
pupils residing over three miles away are automatically entitled to school
transport.  However, over half the primary school role resides outside the
catchment area and attend the school as placement requests.  Some of these
are a few streets away on the other side of the Glasgow Road, within the
catchment for Craigie Primary School. 
4.6 The new traffic signals at the Murray Place/Murray Crescent junction includes
a pedestrian phase which has assisted vehicular and pedestrian movements
across Glasgow Road.  A footway, planned before the school exclusion zone
project, was constructed on the school side of Fairies Road as a drop-off/pick-
up point and to provide an upgraded public transport connection.  A Puffin
crossing was installed on Viewlands Road near the entrance to Perth
Academy.  These measures were planned before the Spaces for People
school exclusion zone project was formulated and will remain in place for all
road users, regardless of the outcome of the school exclusion zone project.   
4.7 The various part-time 20mph speed limits that operated at school times were
extended, connected and made permanent.  All residential streets in the area
will soon be subject to a 20mph speed limit as part of the 20mph National
Strategy being promoted by the Scottish Government.   
4.8 There is a narrow footway along the south (school) side of Viewlands Road to
the west of Murray Terrace, but it does not extend as far as the school gate. 
There is no footway on the south side of Viewlands Road from the point
midway between Viewlands Place and Murray Terrace, to the Glasgow Road
junction.  All pupils travelling along Viewlands Road are required to walk on
the north side of the road, then cross Viewlands Road to access the schools.   
4.9 The parental decision to transport those pupils who reside a distance from the
school by car generates additional traffic, both around the school gate and
within the campus.  At the start of the trial, there was increased parking on
Fairies Road and Oakbank Road from displaced traffic.  Double yellow lines
were installed around public road junctions to prevent obstructive parking.  As
compliance rates have reduced, parking has gradually moved from these
streets on the periphery back onto the streets within the school exclusion
zone. 
4.10 While many parents voiced support for the Viewlands trial, and compliance by
drivers was generally good in the initial months, compliance rates have
steadily decreased.  Current traffic figures are similar to pre-school exclusion
zone levels.   
4.11 Residents within the zone, residents adjacent to the zone and the parents of
hundreds of school children attending Viewlands Primary School and Perth
Page 108 of 146

Page 109

Academy, were invited to participate in a public consultation in June 2024. 
The Traffic & Network Team received 136 responses, with an even split
between residents and parents.  The results are summarised as follows: 
• Remove the school exclusion zone 62 people (46%)
• Amend the school exclusion zone  17 people (12.5%)
• Retain the school exclusion zone  55 people (40%) 
• Other comments/Neutral   2 people (1.5%) 
Almost all the people who wanted the zone removed or amended were
parents or residents adjacent to the zone.  Almost all the people who wanted
the zone retained were residents within the zone. 
4.12 Whatever the reasons for continuing to drive in the school exclusion zone
without a permit (and they appear to be many), drivers are choosing to ignore
the access restriction and drive up to the school gate.  This also includes
driving through the shared-campus.  For any restriction on the road network to
work, the public must accept/understand its basis to exist and comply
accordingly.  It should also be appropriate for the road environment.  This
applies to any restriction, such as a speed limit, priority system or weight limit. 
If it is continually ignored, there is clearly a problem.   
4.13 There are two factors to consider at Viewlands school exclusion zone.  Firstly,
the zone has multiple accesses which enables drivers to easily travel into and
through it.  Secondly, there has been a lack of consistent enforcement.  From
the outset, Police Scotland’s stated position is that they will not routinely
enforce the school exclusion zone but will respond to community concerns
about road safety as, and when, resources permit.  It is their same position as
30mph speed limits and 20mph speed limits.  Restrictions should be
appropriate for the road environment in order to be self-regulating.     
4.14 The Viewlands school exclusion zone in its current configuration is
unworkable.  The Council does not recommend removing the access
restriction completely as this would simply reintroduce the congestion and
road safety problems at the school gates.  It was for this reason that the Head
Teacher and Parent Council wanted us to do something in the first place.  The
request for a school exclusion zone did not come from residents, although
residents within the zone continue to be supportive.  The zone was extended,
and extended again, to cover additional streets at the request of the Ward
Councillors who were representing their constituents.  The Traffic & Network
Team agreed to include the additional streets in the extended area as part of
the trial. 
5. Proposals 
5.1 Balhousie school exclusion zone: With the closure of Balhousie Primary
School the inactive Balhousie school exclusion zone signs can be utilised at
another school exclusion zone site.  As there is no school exclusion zone
planned in the near future, the signs will be disconnected, taken down and put
into storage until required. 
Page 109 of 146

Page 110

5.2 Guildtown school exclusion zone: The access restriction on School Road
for Guildtown Primary School requires no alteration.  A new Puffin crossing is
proposed in Guildtown as part of the second phase of the Cross Tay Link
Road (CTLR) Mitigation Measures project.  The first phase saw the speed
limits reduced to 20mph and ramps installed across the road at the entrances
to the village as part of the first phase.  The preferred location of the Puffin
crossing is on Main Street between the School Road and Hall Road junctions. 
This will encourage pupils to walk to the primary school and reduce
dependence on vehicular traffic.  The crossing could be installed on a flat-
topped ramp as a further speed reduction measure. 
5.3 Inchview school exclusion zone: The access restriction on Craigie Place for
Inchview Primary School requires no alteration. 
5.4 Kinloch Rannoch school exclusion zone: The access restriction on Allt Mor
Crescent at Kinloch Rannoch Primary School requires no alteration.     
5.5 Blairgowrie school exclusion zone: The access restriction on Smithfield
Crescent, McLaren Park and Blackthorn Place requires no alteration.  The
school exclusion zone should be extended to cover the newly constructed
residential street on the school side of Elm Drive.  This is still under
construction and the site remains the responsibility of the developer.  During
the maintenance period, prior to adoption, consultation will be undertaken with
residents about the introduction of an school exclusion zone.  The inactive
school exclusion zone signs on Elm Drive can be relocated to cover the new
street.  The cost of this work will be covered by the TRO Revenue budget in
2025/26.  The retail park on Perth Road will be promoted as an additional
Park & Stride site to the Hazelwood Road facility, utilising the Puffin crossing
on Perth Road that links to the off-road path along Ardblair Trail connecting to
the campus.  This will be included in the new communications strategy. 
5.6 Tulloch school exclusion zone: Pedestrian facilities were to be upgraded
before the access restriction at Tulloch Primary School became operational. 
Two Puffin crossings and a missing section of footway have now been
installed on Primrose Crescent.  The Zebra crossing on Primrose Crescent
has been removed following the relocation of the main pedestrian access to
the school from Gillespie Place to Primrose Crescent.  The Traffic & Network
Team will engage with the Head Teacher during June 2025 regarding a
possible launch of the zone in the autumn term.   
5.7 A continuous footway is planned for Nimmo Avenue, at the Nimmo Place
junction but has still to be designed and programmed.  This will assist
pedestrian movement and suppress vehicle speeds and is scheduled for
2026/27.  Further continuous footways are being considered at the Nimmo
Place/Primrose Crescent and the Gillespie Place/Primrose Crescent
junctions.  The school sits within a full-time 20mph speed limit; and this is due
to be extended later this year to cover the whole Tulloch area as part of the
20mph National Strategy being promoted by the Scottish Government by the
end of 2025.   
Page 110 of 146

Page 111

5.8 Viewlands school exclusion zone: At Viewlands, the school exclusion zone
should be reduced to cover Oakbank Crescent, the upper section of Oakbank
Place and the upper section of Murray Place.  This will ensure both vehicular
and pedestrian accesses to the primary school are located within the school
exclusion zone.  Fairies Road would continue to be a drop-off/pick-up point at
the west of the campus.  Murray Terrace and Viewlands Place would become
drop-off/pick-up points at the east of the campus as originally envisaged. 
These streets were included in the extended trial site, but this moved the area
covered by zone beyond the immediate vicinity of the schools.  If the entire
school exclusion zone is removed completely, school traffic would return to
these streets anyway.   
5.9 The school exclusion zone would be removed from Viewlands Terrace as it is
remote from the school and has experienced little impact from displaced
traffic.  Fraser Terrace needs to be retained within the school exclusion zone
as there is no turning facility at the top of the street which would force drivers
to exit through the school exclusion zone.   
5.10 Although these recommended changes are based on the public consultation
exercise last year, they do represent a major alteration to the school exclusion
zone and a reduction in the number of streets covered by the access
restriction.  As a result, it is proposed to carry out a public consultation
exercise prior to commencing work on the Traffic Regulation Order.  This
would include electronic communication through the schools to the parents
and a maildrop to residents in those streets within and adjacent to the original
zone.  In addition, in co-ordination with the Head Teachers, consultation about
road safety and active travel will be undertaken by the Traffic & Network
Team with pupils in the schools.     
5.11 There are cost implications with preparing a new Traffic Regulation Order,
disconnecting and removing or relocating the school exclusion zone signs and
further upgrading pedestrian facilities in the area.  Removal and relocation of
the electronic signs can be covered by the TRO budget.  The ongoing
administrative costs are also absorbed into the TRO programme and budget. 
5.12 A Puffin crossing will be installed on Fairies Road, in the vicinity of the
Oakbank Crescent junction, to replace the School Crossing Patroller that no
longer operates at the site. 
5.13 The Murray Place/Viewlands Road junction will be reconfigured.  Reducing
the junction radius will lower entrance speeds and enable the footways to be
widened at the crossing points with Athollbank Drive. 
5.14 There is no land available within the road boundary to widen the narrow
footway west of Murray Terrace and provide a connection to connect to Perth
Academy.  There is no land available within the road boundary to construct a
footway as a private dwelling abuts the road.  A priority system will be
installed, reducing the carriageway to single lane.  This would provide the
space for a widened footway and act as a speed reduction measure
(especially if priority is given to uphill traffic).  A new remote footpath could be
constructed through the trees to the Academy’s main entrance, similar to the
Page 111 of 146

Page 112

Viewlands Road path on the uphill side of the school gate.  In the interim,
there is a footway on the north side of Viewlands Road although pupils are
required to cross the road to access the schools. 
5.15 A footway could be constructed along the south side of Viewlands Road to
connect to the Glasgow Road junction.  In the interim, there is a footway on
the north side of Viewlands Road although pupils are required to cross the
road to access the schools. 
5.16 The combined school campus is maintained by Perth & Kinross Council but
does not form part of the public road network.  It is the responsibility of the 
Education & Learning Service.  There are information signs at the two gates
promoting a self-regulating one-way system through the campus.  The entry
point is opposite Muray Place and the exit is opposite Fraser Terrace.  There
are major challenges regarding traffic management and road safety within the
campus due to the conflicting movements by the various competing, but
legitimate, road users.  This is exasperated by the additional, unauthorised
vehicular traffic created by drivers without permits entering the school
exclusion zone and the school grounds.  The Traffic & Network Team will
liaise with the Education & Learning Service to assess the current road layout
within the campus and devise remedial measures. 
5.17 Communications Strategy: A publicity campaign, aimed particularly at new
parents, will be undertaken at the start of each new academic year, with
reminders at the start of each term.  Education initiatives can be used to
change driver behaviour rather than relying solely on enforcement to change
driver behaviour.  This publicity campaign will form part of the
communications strategy for all the school exclusion zones.  This will be
developed between Traffic & Network and the Council’s Communications
Team, in partnership with the Education & Learning Service. 
5.18 In order for the proposals outlined above to be progressed they will require to
be costed and suitable funding identified, most of which can be
accommodated within existing Traffic and Network budgets or external grants.
Some of the additional mitigation measures identified in the proposals in and
around the Viewlands area would require additional funding to progress which
would need further consideration at F&R Committee and/or as part of the
Council’s capital budget setting process. 
6. Conclusion 
6.1 Amendments to the school exclusion zones will help encourage better
compliance with the access restrictions at each site and reduce the need for
regular enforcement. 
6.2 Promotion of, and compliance with, the school exclusion zones will help make
the streets around the schools safer by reducing the risk of conflict between
the various road users. 
Page 112 of 146

Page 113

6.3 Promotion of, and compliance with, the school exclusion zones will help
reduce dependence on vehicular transport and encourage active modes of
transport. 
7. Impact and Value Assessment 
https://www.pkc.gov.uk/media/54054/School-Exclusion-Zone-
Programme/pdf/School_Exclusion_Zone_Programme.pdf?m=1747740832007 
8. Appendices 
8.1 Appendix 1 - Drawing VSEZ1 Existing Layout
8.2 Appendix 2 - Drawing VSEZ2 Proposed Layout 
Page 113 of 146

Page 114

Page 114 of 146

Page 115

44
1522
17
20
13
25
M
UIREND
G
RO
VE
18
M
UIREND
AVENUE
21
35
12
CherrybankGardens
4
House
Play Area
14
FB
9
9
FB
Pond
GLASGOW ROAD
NECESSITY
219
BRAE
Pond
34
225
Balancing
7
39
Pond19
51.5m
1
20
5
14
14
KINMOND DRIVE
Pond
BELL GARDENS
25
1
17
2
2
1
Merlin
Scouring Burn
FB
Pond
12
Cottages
Pond8
FB
8
38
57
to
22
31
Shelter
239
49.7m
Sculpture
43
FB
14
25
16
19
1
Balancing Ponds
17
FB
1
NECESSITY BRAE
233
6
19
26
Pitheavlis
19
1
221
28
19
21
3
BUCHAN ROAD
2
71.6m
4
24
51
(covered)
26
47
5
DRIVE
7
31
18
2
36
1
53
2
ATHO
LLBANK
4
Playing Field
Reservoir
6
34
Sports Pavilion
Fairview School
37
17
14
30
28
58.8m
25
3
Sub Sta
3
6
37
El
2
to
4
26
ARTHUR PARK
15
2
30
42
OAKBANK PLACE
Shelter
231
1
43
58.2m
2
Shelter
241
29
LB
18
to
32
39
17 to 27
CHERRYBANK
1
2
32
ESS
6a to 6i
2
69
LB
El Sub Sta
OAKBANK ROAD
1
69.5m
CLEEVE DRIVE
753 OAKBANK CRESCENT
STEPHEN
FRANCIS
ROAD
68
10
8
2
10
58
1
21
65
M
ILLER
AVENUE
44
27
5
FAIRIES
RO
AD
18
24
36
47
13
58
1
4
NORIE
TERRACE
1
63
67
4a to 4i
62
56
12
7
Shelter
FAIRIES
RO
AD
25
23
15
2
Stone
6
51
9
43
37
26
16
14
1
13
2
3
101
36
30
24
97
BUCHAN
DRIVE
47
11
26
3
81.7m
22
61
VIEWLANDS ROAD WEST
59
57
8
84.7m
50Ross Grove
ROSS AVENUE
2
VIEWLANDS ROAD
AVENUE
RO
SS
20
1
CLEEVE PARK
25
14
22
35
30
11
11
74.1m
29
38
8
1
Oakbank Primary School
2
Sub Sta
11
28
Posts
Stone
44
2
5
55
16
83
Tank
11
4
42
32
TERRACE
54
12
ROSS AVENUE
9
2
Stone
El
Posts
2
FB
Allotment Gardens
Bellsview
1
GLASGOW ROAD211
(PH)Cherrybank Inn
215
10
LOW ROAD
209
3
Burn
2
11 to 13
7
4
Pickembere
TCB
39.0m
92
B1 to B10A1 to A9
LB
103
Shelter
109
13
ROSEBANK
11
36.3m
2
2
4 G
LASG
O
W
RO
AD
1
86
Corsie
Posts
3
14
2
El Sub Sta
1
93
74
107
TULLYLUMB
TERRACE
1
105a
105
1
Lovat Hotel
4
Hurstridge
Oaklands
7
14
El Sub Sta
8
1 to 6
1
HAMILTON
PLACE
8
5
6
2
2
El Sub Sta
34
1
11
Path
Path
43
1
15a
25
2
23
House
13
El Sub Sta
Hall
19
Reservoir
VIEWLANDS ROAD
1
ATHOLLBANK DRIVE
HAMILTON PLACE
22
11
16
27
VIEWLANDS
HAM
ILTON
LANE
15b
21
Athollbank
58.5m
64.9m
35
6a
12
Viewlands Court
VIEW
LANDS
PLACE
42
42.7m
16
ATHOLLBANK
Viewlands
(covered)
Perth Academy
M
URRAY
TERRACE
Cottage
26
17
53.6m
8
HAMILTON GARDENS
4
18
5
Tennis Courts
198
190
188
192 4
7
165
24
MURRAY PLACE
10
Allanbank
16
1
41.1m
31
Garage
21
202
3
10
8
19
15
2
183
17
13
33
4
4
VIEWLANDS TERRACE
29
5
17
34 to 44
162
41.8m
33
32
19
5
BRAESIDE GARDENS
Nursery
13
31
36
30
CHERRYBANK GROVE
37
Shelter
6
20
38
201
193b
193a
28
3
39
8
2
VIEW
LANDS
TERRACE
10
20
155
18
29
5
12
3
166
197
186
22
15
11
17
5
207
11
163
9
6
200
176
35
12
20
OAKBANK ROAD
41.5m
9
Craigie Burn
181
LB
3
19
195
9
Craigiebank
12
20
Scouring
13
14
21
OAKBANK
CRESCENT
3
21
FRASER TERRACE
Childrens
33
52.4m
2
12
Viewlands Primary School
2
24a
34
27
191
1
El Sub
Sta
184
22
160
40
BRAESIDE GARDENS
El Sub
Sta
120
8
7
133
141
FB
VIEW
LANDS
TERRACE
26
144
127
60
134
50
PITHEAVLIS
TERRACE
12
LB
PITHEAVLIS
17
66
5
1
128
1
52
Shelter
MURRAY CRESCENT
152
12 11
121
1 to 4
30
1a
121
9
23
12
108
100
114
117
94
ORCHARD PLACE
69
Tennis Courts
116
119
9
Path (um)
124
G
ARDENS
1
122
2
14
113
1
111
118
12
27
Castle
GLASGOW
ROAD
Pitheavlis
54
20
139
116a
56
Club
CASTLE
64
ESS
2
1
137
43.3m
6
7
68
6
54
69
42
42.1m
El Sub Sta
1
58
18 to 24
House
45.4m
16
51
67
Club
56
79
6a to 6i
OAKBANK ROAD
69.5m
753 OAKBANK CRESCENT
58
25
65
37
18
24
58
4a to 4i
56
15
2
Stone
42
1
50Ross Grove
ROSS AVENUE
AVENUE
RO
SS
14
22
11
74.1m
8
1
2
29
Stone
54
Stone
CherrybankGardens
4
House
Play Area
14
FB
2
9
9
1
FB
CLEEVE DRIVE
37
17
Pond
GLASGOW ROAD
STEPHEN
FRANCIS
ROAD
14
10
8
2
NECESSITY
219
10
30
28
58.8m
1
3
Sub Sta
21
3
6
BRAE
M
ILLER
AVENUE
Pond
44
El
2
27
5
34
to
225
Balancing
7
36
4
39
13
4
NORIE
TERRACE
1
Pond19
12
7
1
20
5
14
14
KINMOND DRIVE
Pond
25
23
BELL GARDENS
ARTHUR PARK
25
1
15
2
17
2
2
1
30
Merlin
51
Scouring Burn
FB
Pond
9
OAKBANK PLACE
12
Shelter
Cottages
43
37
26
231
16
14
13
2
3
1
8
FB
43
8
38
57
to
20
1
CLEEVE PARK
25
35
30
11
58.2m
29
2
22
Shelter
31
Shelter
241
11
Posts
239
44
2
5
49.7m
55
Sculpture
43
FB
17 to 27
14
25
16
19
1
Balancing Ponds
17
FB
CHERRYBANK
11
1
NECESSITY BRAE
42
32
233
6
TERRACE
12
1
ROSS AVENUE
9
2
19
26
Pitheavlis
19
1
2
28
Sports Pavilion
Fairview School
68
FAIRIES
RO
AD
47
1
62
Shelter
2
Sub Sta
4
El
Playing Field
ESS
69
LB
El Sub Sta
44
63
67
FAIRIES
RO
AD
6
19
101
15
21
22
17
36
3
30
24
BUCHAN ROAD
20
2
97
71.6m
BUCHAN
DRIVE
4
24
47
51
(covered)
13
26
11
47
5
26
25
3
81.7m
DRIVE
22
61
VIEWLANDS ROAD WEST
7
59
57
31
M
UIREND
G
RO
VE
8
18
2
18
36
84.7m
VIEWLANDS ROAD
38
Oakbank Primary School
1
53
28
2
ATHO
LLBANK
4
Reservoir
M
UIREND
AVENUE
16
6
21
83
Tank
35
12
34
Posts
2
51.5m
26
Pond
LB
18
to
32
39
221
32
Allanbank
Bellsview
7
7
14
8
1 to 6
1
2
11
15a
13
El Sub Sta
1
HAMILTON PLACE
22
11
16
HAM
ILTON
LANE
15b
12
Viewlands Court
VIEW
LANDS
PLACE
42.7m
26
HAMILTON GARDENS
4
18
5
160
4
7
188
10
16
FB
Garage
8
19
17
13
33
34 to 44
41.8m
BRAESIDE GARDENS
Cherrybank Inn
193b
2
10
215
18
1
12
197
22
17
Burn
2
OAKBANK ROAD
16
LB
19
9
11 to 13
7
20
Scouring
OAKBANK
CRESCENT
TCB
3
Childrens
2
1
22
40
BRAESIDE GARDENS
92
B1 to B10A1 to A9
LB
VIEW
LANDS
TERRACE
103
Shelter
109
13
ROSEBANK
11
PITHEAVLIS
TERRACE
36.3m
2
2
4 G
LASG
O
W
RO
AD
1
1
1
86
Corsie
Posts
3
14
2
1a
121
9
El Sub Sta
1
12
93
108
74
100
114
117
107
TULLYLUMB
TERRACE
1
105a
105
1
Lovat Hotel
4
Hurstridge
Oaklands
El Sub Sta
HAMILTON
PLACE
8
5
6
2
El Sub Sta
34
1
Path
Path
43
1
25
2
23
House
Hall
19
Reservoir
VIEWLANDS ROAD
ATHOLLBANK DRIVE
27
VIEWLANDS
21
Athollbank
58.5m
64.9m
35
6a
42
16
ATHOLLBANK
Viewlands
(covered)
Perth Academy
M
URRAY
TERRACE
Cottage
17
53.6m
8
Tennis Courts
El Sub
Sta
120
198
165
190
192
8
24
MURRAY PLACE
7
133
68
141
FB
1
26
41.1m
31
21
202
3
10
144
Allotment Gardens
127
15
60
2
183
134
4
4
VIEWLANDS TERRACE
29
5
17
162
50
33
32
19
5
12
LB
1
GLASGOW ROAD
PITHEAVLIS
Nursery
6
211
54
13
31
36
30
(PH)
CHERRYBANK GROVE
69
17
37
Shelter
6
20
66
5
42
38
201
42.1m
193a
28
El Sub Sta
3
128
39
8
VIEW
LANDS
TERRACE 52
Shelter
20
MURRAY CRESCENT
10
155
29
LOW ROAD
5
3
166
186
152
12
209
11
121
3
1 to 4
30
15
11
23
94
ORCHARD PLACE
69
Tennis Courts
116
5
207
58
11
119
163
9
6
200
18 to 24
176
House
45.4m
9
35
12
Path (um)
20
124
41.5m
9
Craigie Burn
181
51
G
ARDENS
3
195
1
67
122
Craigiebank
2
12
13
14
4
14
Club
113
1
21
111
118
12
56
27
Castle
GLASGOW
ROAD
Pickembere
Pitheavlis
54
20
139
116a
56
Club
21
FRASER TERRACE
CASTLE
64
ESS
33
2
52.4m
2
12
Viewlands Primary School
1
137
24a
34
27
79
191
El Sub
Sta
184
43.3m
6
39.0m
A4
Environment &
Infrastructure
NORTH
*****
*****_01
NTS
07/03/2025
Fraser Crofts - Strategic Lead
© Crown copyright [and database rights] 2025 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Viewlands
School Exclusion Zone
Existing
L.H
Legend
Site Location
NORTH
Existing School Exclusion
Zone
8
Page 115 of 146

Page 116

Page 116 of 146

Page 117

44
1522
17
20
13
25
M
U
IR
EN
D
GROVE
18
M
U
IR
EN
D
AVENUE
21
35
12
CherrybankGardens
4
House
Play Area
14
FB
9
9
FB
Pond
GLASGOW ROAD
NECESSITY
219
BRAE
Pond
34
225
Balancing
7
39
Pond19
51.5m
1
20
5
14
14
KINMOND DRIVE
Pond
BELL GARDENS
25
1
17
2
2
1
Merlin
Scouring Burn
FB
Pond
12
Cottages
Pond8
FB
8
38
57
to
22
31
Shelter
239
49.7m
Sculpture
43
FB
14
25
16
19
1
Balancing Ponds
17
FB
1
NECESSITY BRAE
233
6
19
26
Pitheavlis
19
1
221
28
19
21
3
BUCHAN ROAD
2
71.6m
4
24
51
(covered)
26
47
5
D
R
IVE
7
31
18
2
36
1
53
2
ATH
O
LLBANK
4
Playing Field
Reservoir
6
34
Sports Pavilion
Fairview School
37
17
14
30
28
58.8m
25
3
Sub Sta
3
6
37
El
2
to
4
26
ARTHUR PARK
15
2
30
42
OAKBANK
PLACE
Shelter
231
1
43
58.2m
2
Shelter
241
29
LB
18
to
32
39
17 to 27
CHERRYBANK
1
2
32
ESS
6a to 6i
2
69
LB
El Sub Sta
OAKBANK ROAD
1
69.5m
CLEEVE DRIVE
753 OAKBANK CRESCENT
STEPHEN
FRAN
C
IS
ROAD
68
10
8
2
10
58
1
21
65
M
ILLER
AVENUE
44
27
5
FAIR
IES
ROAD
18
24
36
47
13
58
1
4
N
OR
IE
TERRACE
1
63
67
4a to 4i
62
56
12
7
Shelter
FAIR
IES
ROAD
25
23
15
2
Stone
6
51
9
43
37
26
16
14
1
13
2
3
101
36
30
24
97
BU
C
HAN
DRIVE
47
11
26
3
81.7m
22
61
VIEWLANDS ROAD WEST
59
57
8
84.7m
50Ross Grove
ROSS AVENUE
2
VIEWLANDS ROAD
AVENUE
R
O
SS
20
1
CLEEVE PARK
25
14
22
35
30
11
11
74.1m
29
38
8
1
Oakbank Primary School
2
Sub Sta
11
28
Posts
Stone
44
2
5
55
16
83
Tank
11
4
42
32
TERRACE
54
12
ROSS AVENUE
9
2
Stone
El
Posts
2
FB
Allotment Gardens
Bellsview
1
GLASGOW ROAD211
(PH)Cherrybank Inn
215
10
LOW ROAD
209
3
Burn
2
11 to 13
7
4
Pickembere
TCB
39.0m
92
B1 to B10A1 to A9
LB
103
Shelter
109
13
ROSEBANK
11
36.3m
2
2
4 G
LASG
O
W
ROAD
1
86
Corsie
3
14
2
El Sub
1
93
107
TULLYLUMB TERRACE
1
105a
105
1
Lovat Hotel
4
Hurstridge
Oaklands
7
14
El Sub Sta
8
1 to 6
1
HAMILTON
PLACE
8
5
6
2
2
El Sub Sta
34
1
11
Path
Path
43
1
15a
25
2
23
House
13
El Sub Sta
Hall
19
Reservoir
VIEWLANDS ROAD
1
ATHOLLBANK DRIVE
HAMILTON PLACE
22
11
16
27
VIEWLANDS
HAM
ILTON
LANE
15b
21
Athollbank
58.5m
64.9m
35
6a
12
Viewlands Court
VIEW
LAND
S
PLACE
42
42.7m
16
ATHO
LLBANK
Viewlands
(covered)
Perth Academy
M
U
R
RAY
TERRACE
Cottage
26
17
53.6m
8 HAMILTON GARDENS
4
18
5
Tennis Courts
198
190
188
192 4
7
165
24
MURRAY PLACE
10
Allanbank
16
1
41.1m
31
Garage
21
202
3
10
8
19
15
2
183
17
13
33
4
4
VIEWLANDS
TERRACE
29
5
17
34 to 44
162
41.8m
33
32
19
5
BRAESIDE GARDENS
Nursery
13
31
36
30
CHERRYBANK GROVE
37
Shelter
6
20
38
201
193b 193a
28
3
39
8
2
VIEW
LANDS
TERRACE
10
20
155
18
29
5
12
3
166
197
186
22
15
11
17
5
207
11
163
9
6
200
176
35
12
20
OAKBANK ROAD
41.5m
9
Craigie Burn
181
LB
3
19
195
9
Craigiebank
12
20
Scouring
13
14
21
OAKBANK
CRESCENT
3
21
FRASER TERRACE
Childrens
33
52.4m
2
12
Viewlands Primary School
2
24a
34
27
191
1
El Sub
Sta
184
22
160
40
BRAESIDE GARDENS
120
8
7
133
141
FB
VIEW
LAN
D
S
TERRACE
26
144
127
60
134
50
PITH
EAVLIS
TERRACE
12
LB
PITHEAVLIS
17
66
5
1
128
1
52
Shelter
MURRAY CRESCENT
152
12
11
121
1
to 4
30
1a
121
9
23
108
100
114
117
94
69
116
119
9
Path (um)
124
G
AR
D
ENS
1
122
2
14
113
1
111
118
12
27
Castle
GLASGOW
ROAD
Pitheavlis
54
20
139
116a
56
Club
CASTLE
64
ESS
2
137
43.3m
6
7
68
6
54
69
42
42.1m
El Sub Sta
1
58
18 to 24
House
45.4m
16
51
67
Club
56
79
6a to 6i
OAKBANK ROAD
69.5m
753 OAKBANK CRESCENT
58
25
65
37
18
24
58
4a to 4i
56
15
2
Stone
42
1
50Ross Grove
ROSS AVENUE
AVENUE
R
O
SS
14
22
11
74.1m
8
1
2
29
Stone
54
Stone
CherrybankGardens
4
House
Play Area
14
FB
2
9
9
1
FB
CLEEVE DRIVE
37
17
Pond
GLASGOW ROAD
STEPHEN
FRAN
C
IS
ROAD
14
10
8
2
NECESSITY
219
10
30
28
58.8m
1
3
Sub Sta
21
3
6
BRAE
M
ILLER
AVENUE
Pond
44
El
2
27
5
34
to
225
Balancing
7
36
4
39
13
4
N
OR
IE
TERRACE
1
Pond19
12
7
1
20
5
14
14
KINMOND DRIVE
Pond
25
23
BELL GARDENS
ARTHUR PARK
25
1
15
2
17
2
2
1
30
Merlin
51
Scouring Burn
FB
Pond
9
OAKBANK
PLACE
12
Shelter
Cottages
43
37
26
231
16
14
13
2
3
1
8
FB
43
8
38
57
to
20
1
CLEEVE PARK
25
35
30
11
58.2m
29
2
22
Shelter
31
Shelter
241
11
Posts
239
44
2
5
49.7m
55
Sculpture
43
FB
17 to 27
14
25
16
19
1
Balancing Ponds
17
FB
CHERRYBANK
11
1
NECESSITY BRAE
42
32
233
6
TERRACE
12
1
ROSS AVENUE
9
2
19
26
Pitheavlis
19
1
2
28
Sports Pavilion
Fairview School
68
FAIR
IES
ROAD
47
1
62
Shelter
2
Sub Sta
4
El
Playing Field
ESS
69
LB
El Sub Sta
44
63
67
FAIR
IES
ROAD
6
19
101
15
21
22
17
36
3
30
24
BUCHAN ROAD
20
2
97
71.6m
BU
C
HAN
DRIVE
4
24
47
51
(covered)
13
26
11
47
5
26
25
3
81.7m
D
R
IVE
22
61
VIEWLANDS ROAD WEST
7
59
57
31
M
U
IR
EN
D
GROVE
8
18
2
18
36
84.7m
VIEWLANDS ROAD
38
Oakbank Primary School
1
53
28
2
ATH
O
LLBANK
4
Reservoir
M
U
IR
EN
D
AVENUE
16
6
21
83
Tank
35
12
34
Posts
2
51.5m
26
Pond
LB
18
to
32
39
221
32
Allanbank
Bellsview
7
7
14
8
1 to 6
1
2
11
15a
13
El Sub Sta
1
HAMILTON PLACE
22
11
16
HAM
ILTON
LANE
15b
12
Viewlands Court
VIEW
LAND
S
PLACE
42.7m
26
HAMILTON GARDENS
4
18
5
160
4
7
188
10
16
FB
Garage
8
19
17
13
33
34 to 44
41.8m
BRAESIDE GARDENS
Cherrybank Inn
193b
2
10
215
18
1
12
197
22
17
Burn
2
OAKBANK ROAD
16
LB
19
9
11 to 13
7
20
Scouring
OAKBANK
CRESCENT
TCB
3
Childrens
2
1
22
40
BRAESIDE GARDENS
92
B1 to B10A1 to A9
LB
VIEW
LAN
D
S
TERRACE
103
Shelter
109
13
ROSEBANK
11
PITH
EAVLIS
TERRACE
36.3m
2
2
4 G
LASG
O
W
ROAD
1
1
1
86
Corsie
3
14
2
1a
121
9
El Sub
1
93
108
100
114
117
107
TULLYLUMB TERRACE
1
105a
105
1
Lovat Hotel
4
Hurstridge
Oaklands
El Sub Sta
HAMILTON
PLACE
8
5
6
2
El Sub Sta
34
1
Path
Path
43
1
25
2
23
House
Hall
19
Reservoir
VIEWLANDS ROAD
ATHOLLBANK DRIVE
27
VIEWLANDS
21
Athollbank
58.5m
64.9m
35
6a
42
16
ATHO
LLBANK
Viewlands
(covered)
Perth Academy
M
U
R
RAY
TERRACE
Cottage
17
53.6m
8
Tennis Courts
120
198
165
190
192
8
24
MURRAY PLACE
7
133
68
141
FB
1
26
41.1m
31
21
202
3
10
144
Allotment Gardens
127
15
60
2
183
134
4
4
VIEWLANDS
TERRACE
29
5
17
162
50
33
32
19
5
12
LB
1
GLASGOW ROAD
PITHEAVLIS
Nursery
6
211
54
13
31
36
30
(PH)
CHERRYBANK GROVE
69
17
37
Shelter
6
20
66
5
42
38
201
42.1m
193a
28
El Sub Sta
3
128
39
8
VIEW
LANDS
TERRACE 52
Shelter
20
MURRAY CRESCENT
10
155
29
LOW ROAD
5
3
166
186
152
12
209
11
121
3
1
to 4
30
15
11
23
94
69
116
5
207
58
11
119
163
9
6
200
18 to 24
176
House
45.4m
9
35
12
Path (um)
20
124
41.5m
9
Craigie Burn
181
51
G
AR
D
ENS
3
195
1
67
122
Craigiebank
2
12
13
14
4
14
Club
113
1
21
111
118
12
56
27
Castle
GLASGOW
ROAD
Pickembere
Pitheavlis
54
20
139
116a
56
Club
21
FRASER TERRACE
CASTLE
64
ESS
33
2
52.4m
2
12
Viewlands Primary School
137
24a
34
27
79
191
El Sub
Sta
184
43.3m
6
39.0m
Environment &
Infrastructure
NORTH
*****
*****_01
NTS
07/03/2025
Fraser Crofts - Strategic Lead
© Crown copyright [and database rights] 2025 OS 100016971. You are permitted to use this data solely to enable you to respond to, or interact with, the
organisation that provided you with the data. You are not permitted to copy, sub-licence, distribute or sell any of this data to third parties in any form.
Viewlands
School Exclusion Zone
Proposed
L.H
Legend
Proposed School
Exclusion Zone
Site Location
NORTH
Page 117 of 146

Page 118

Page 118 of 146

Page 119

Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy & Infrastructure Committee 
Date of Meeting: 28 May 2025 
Report Title:   Active Travel Prioritisation Delivery Plan 
Report Number: 25/132 
Report Author: Blair Watt, Road Safety Project Officer 
Organisational Lead: Fraser Crofts, Strategic Lead – Environment and
Infrastructure
___________________________________________________________________ 
1. Purpose 
1.1 The purpose of this report is to update Committee on Active Travel in Perth
and Kinross. It provides an update on projects completed in 2024/25, details
the funding provided by Transport Scotland in 2025/26 and seeks Committee
approval of the Active Travel Prioritisation Delivery Plan. 
1.2 Sections 
1. Purpose
2. Recommendation(s)
3. Background/Context
4. Proposals
5. Conclusion
6. Impact Value Assessment
7. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 Notes the changes in Active Travel Infrastructure funding. 
2.2 Notes the projects implemented from Tier 1 and other external grant funding
for 2024/25 as detailed at Appendix 1. 
2.3 Approves the Prioritisation Delivery Plan as detailed in Appendix 2. 
9
Page 119 of 146

Page 120

2.4 Approves delegation of projects for delivery to the Strategic Lead Environment
& Infrastructure, within available funding, based on the prioritised list of
projects which have been subject to the criteria set out in the Prioritisation
Delivery Plan. 
3. Background/Context 
3.1  In 2024/25, Transport Scotland changed the funding arrangements for Active
Travel in Scotland. The previous Cycling, Walking and Safer Routes (CWSR)
programme was ended and the Active Travel Infrastructure Fund created. The
distribution of the funding has also changed. Tier 1 funding, awarded to all
local authorities, is now provided to the Council as part of its block grant
rather than as an individual CWSR grant. This provides greater flexibility than
with the previous CWSR. Tier 2 funding, designed for larger scale active
travel projects and is match funded, is allocated through an application
process.   
3.2 Tier 1 funding must be spent on Active Travel related initiatives or local
authorities risk losing or a reduction in funding. 
3.3 The methodology for awarding Active Travel funding to local authorities has
also changed. The methodology has been designed to ensure that allocations
are consistent with our shared policy priorities and are focused on inequality
and delivering modal shift – enabling more people to make the switch from
their cars to Active Travel, while ensuring that all areas of Scotland are
supported. It also introduces a minimum £200,000 allocation for each local
authority which has led to local authorities with smaller populations and less
areas of deprivation seeing a reduction in funding. 
3.4 In 2024/25 Perth and Kinross Council received a capital grant of £738,757 for
Active Travel Infrastructure. As the previous years funding was £982,182, this
is a reduction of £243,425 or 25% from the previous year’s CWSR funding.   
3.5 Transport Scotland’s long-term vision for active travel in Scotland 2030 is to
make walking or cycling the most popular choice for shorter everyday
journeys, by making it safer, easier and available to everyone. It is intended to
achieve many outcomes, including better health, having attractive, safe
communities and increased economic activity.   
Tier 1 Active Travel Infrastructure Fund (ATIF) 2024/25 
3.6 At its meeting on 29 May 2024 (Report No 24/162 refers), the Economy and
Infrastructure Committee approved a list of works to be funded from the
anticipated 2024/25 Scottish Government grants of £982,000 for CWSR
projects. However, the actual grant received was significantly lower
(£738,757). This was due to the changes detailed above. 
3.7 The Traffic and Network team were successful in applications for externally
sourced grant funding. This led to a collaborative approach to a number of
projects. 
Page 120 of 146

Page 121

3.8 In total, £549,716 of actual works was funded in 2024/25 from Tier 1 and
other external funding grants. In addition, £420,025 was received in external
grant funding. £170,257 was received through working with Cycling Scotland
to install cycle parking through Perth and Kinross. £80,000 was received from
Paths for All for Construction of the shared-use path at Jeanfield Swifts
stadium. £120,403 was provided in Transport Scotland's Local Authority
Direct Award grant. £49,365 was secured from Sustrans NCN development
fund for a feasibility study on Tay Street and construction of shared-use path
from the Fife Council boundary to Benarty Road. This coincided with work
carried out by Fife Council linking Kelty to Cowdenbeath. 
3.9  Staff costs of £86,049 were claimed against Tier 1 funding. This is a reduction
from previous years due to staff redeployment to national and local priorities
such as the introduction of national pavement parking ban, CTLR mitigation
measures and national 20mph speed limit strategy. 
3.10 Several projects initiated during 2024/25 did not progress as planned for
various reasons such a building warrants, available budget or land issues.
Additionally, some projects that commenced construction in 2024/25 were not
completed until early 2025/26. Consequently, this resulted in an underspend
of £182,992. The funding was carried forward into 2025/26 to ensure the
completion and delivery of these previously agreed projects. 
3.11 Due to changes in funding introduced by Transport Scotland, Tactran
confirmed that they were not provided with any infrastructure funding for
2024/25 so no applications were submitted by them. 
3.12 The projects delivered during 2024/25 have provided improvements for the
most vulnerable road users in our communities. The measures include
improvements to dropped kerbs, signalized junction to assist pedestrians,
provision of missing link footways and shared use link to assist and
encourage pedestrians and cyclists in local communities to use active travel
for everyday journeys. A contribution was also made to feasibility and design
work on making Dunkeld train station more accessible for walkers, wheelers
and cyclists. A breakdown of each project and its costs can be found in
appendix 1. 
3.13 Walking and cycling benefits the individual with not just physical health
benefits but also provides benefits for mental health, the environment and
keeping people’s transport costs down. Perth and Kinross is committed to
making it easier for everyone to incorporate Active Travel choices into their
daily routines. 
Tier 2 Active Travel Infrastructure Fund (ATIF) 2024/25 
3.14 PKC did not have any projects that were “construction ready” so no
applications were submitted for Tier 2 funding in 2024/25. 
Page 121 of 146

Page 122

4. Proposal – Active Travel Prioritisation Delivery Plan  
4.1 Perth and Kinross Council commissioned Arup to develop an Active Travel
Prioritisation Delivery Plan for Active Travel routes identified in master plans
and strategies across the PKC area, as well as other route proposals
developed by internal PKC teams and local community groups. 
4.2 A number of Active Travel Masterplans (ATMs) have been developed for the
PKC region. These include: 
• Perth Cycle Network Masterplan (2018) which aims to create a coherent
cycle network in Perth. 
• Kinross-shire Active Travel Masterplan (2024) which identifies and
prioritises active travel interventions to encourage short everyday
journeys.
• Tactran Regional Active Travel Network (2023) which establishes a
framework for developing regional active travel routes, with the aim of
providing connections between settlements, neighbourhoods and major
trip destinations. 
4.3 The purpose of this commissioned work was to develop a robust and
evidence-led Multi-Criteria Assessment (MCA) to prioritise routes in the ATMs
and additional routes identified by PKC teams and local community groups. 
4.4 The methodology used to develop the prioritisation is informed by and aligns
with key policies and objectives outlined in the Perth and Kinross Mobility
Strategy. This strategy sets out future direction and policy focus for transport
in the Perth and Kinross Council area. 
4.5 The delivery plan scores projects against a set criteria that aligns with the
Mobility Strategy and national guidance/best practice on Active Travel
Infrastructure. The Criteria includes: 
• Deliverability – How deliverable is a route? Within adopted road? Cost/
Additional permissions? 
• Social Deprivation – Will the route serve areas with high levels of
deprivation? 
• Potential users – How many people will be able to access the route? 
• Public Transport – Does the route connect to the wide public transport
network?
• Safety – Will the route serve areas with high levels of deprivation? 
• Connectivity – does it link into key trips generators? Health Services?
Employment? Leisure Facilities? Education? Etc 
• Air Quality Management – Will the route reduce traffic in area with poor air
quality? 
• Rurality – Does the route provide connections to rural areas? 
Page 122 of 146

Page 123

4.6 Each criteria was given a score of high/medium/low (5/3/1) depending on how
the proposed route serviced the different criteria. For example, a route that
serviced no school was given a score of one, a route that serviced one or two
schools was given a score of three and a route that serviced more than two
schools was given five.   
4.7 So that the MCA can be tailored to suit different planning objectives, a
variable weighting approach was tested. This allows different criteria to be
given a higher or lower weighting in the final score.   
4.8 A range of different approaches were tested including weighting all criteria
equally, prioritising deliverability over other criteria and weighting each criteria
according to how well they aligned with the Mobility Strategy transport
planning objectives. 
4.9 The Prioritisation Delivery Plan will be used to identify projects for delivery for
future years. 
4.10 Funding for the delivery plan will come from Tier 1 Active Travel Infrastructure
Fund and applications will be submitted to Transport Scotland for Tier 2 active
travel funding. Depending on the scale of some projects Capital budget may
need to be identified to provide match funding. 
4.11 New projects will be added to the Prioritised Delivery Plan as and when they
are identified. These projects may be identified by internal PKC teams or local
community groups. The list will be managed by the Active Travel Co-Ordinator
within the Traffic and Network team which will ensure there is a consistent
approach to scoring of each project. 
4.12 This report seeks approval of the Prioritisation Delivery Plan so that it can be
used to identified and progress Active Travel infrastructure in Perth and
Kinross. 
4.13 The full report on the Perth and Kinross Active Travel Prioritisation Delivery
Plan including the prioritised list of projects can be found in appendix 2.   
Tier 1 Active Travel Infrastructure Fund (ATIF) 2025/26 
4.14 In 2025/26 Perth and Kinross Council (PKC) has been awarded £796,000
from Transport Scotland for Tier 1. This funding will be used to deliver Active
Travel projects where we have given a previous commitment to and projects
identified as part of the Prioritised Delivery Plan as detailed above.     
4.15 Depending on the success of our Tier 2 applications, Tier 1 may be utilised for
construction of unsuccessful Tier 2 projects or to procure additional resources
to carry out feasibility and design for projects identified in the delivery plan. 
Page 123 of 146

Page 124

Tier 2 Active Travel Infrastructure Fund (ATIF) 2025/26 
4.16 Transport Scotland opened funding for Tier 2 active travel infrastructure
2025/26 on 16 January 2025, with applications required to be submitted by
14 February 2025. 
4.17 Transport Scotland confirmed that only local authorities, Regional Transport
Partners (TACTRAN for PKC) or National Park could apply for Tier 2. They
also provided an update on Sustrans Place for Everyone fund (PfE). 
4.18 Transport Scotland confirmed that from 2025/26 PfE will cease to exist and
projects would transition to the new Tier 2 application process administered
by Transport Scotland. This has resulted in significant changes to Sustrans
operations and has removed the ability for local community groups to engage
with Sustrans to pursue local priorities. 
4.19 Projects must be designed and constructed in accordance with guidelines
provided in Cycling by Design 2021. 
4.20  Tier 2 caters to two types of applications. Projects that are at a construction
ready stage can apply for match funding of construction costs, which will likely
be 70% but may vary depending on the type of project. Transport Scotland
will not cover the cost of higher amenity materials than they deem necessary.
This is to ensure best value for ATIF. Alternatively, projects that require
design work will be funded at 100% and divided into two stages: Stage 0-2
(feasibility, business case, and concept design) and Stage 3-4 (detailed
design and works package ready for construction) 
4.21 The Traffic and Network team have submitted six bids to the Tier 2 Active
Travel Infrastructure Fund 2025/26. These include two bids for construction
ready projects and four bids for design. In total, £1,190,000 was applied for
Tier 2 funding. The bids are as follow: 
• Scone to Scone Airport Active Travel route - £490,000 construction bid 
• Dunkeld train station accessibility improvements - £150,000 construction
bid submitted on behalf of Network Rial. 
• Errol to Grange Corridor - £100,000 Stage 3-4 design bid
• Glasgow Road Corridor - £300,000 Stage 0-2 design bid 
• Marshall Place Corridor - £100,000 Stage 0-2 design bid
• Kinross Park and Ride to High Street corridor - £50,000 Stage 0-2 design
bid. 
4.22 At the time of writing 28 April 2025 we are still awaiting confirmation of the
status of our bids. 
5. Conclusion 
5.1 Implementation of the Active Travel Prioritisation Delivery Plan will create a
prioritised list of projects for introduction through Active Travel budgets.
Projects will be added and progressed to the prioritised list as and when they
are requested with delivery subject to available funding.
Page 124 of 146

Page 125

5.2 The list, which will be a live document and available at any time for Elected
Members to view, will create a project pipeline for Perth and Kinross so that
applications can be made to external funders. 
5.3 Progression of projects will be delegated to the Strategic Lead Environment &
Infrastructure from the prioritised list within the available funding. The
additional flexibility provided by Tier 1 funding being awarded as block grant
will help to support the delivery of projects between financial years without the
restrictions of needing to spend by the end of any one financial year. 
6. Impact and Value Assessment 
Active_Travel_Prioritisation_Delivery_Plan.pdf 
7. Appendices 
7.1 Appendix 1 - 2024/25 Completed Projects list 
7.2 Appendix 2 - Active Travel Prioritised Delivery Plan 
Page 125 of 146

Page 126

Page 126 of 146

Page 127

Appendix 1 – Active Travel Infrastructure 2024/25 
Active Travel Infrastructure – Tier 1
Project  Costs
Signalised junction West Moulin Road/Atholl Road in Pitlochry.  £78,020
Construction of signalised junction at the junction of West Moulin Road and
Atholl Road in Pitlochry to improve pedestrian safety.
Auchterarder Shared Use Path £129,504
Construction of shared use path and green route on at the A824 from the
town boundary to B8062 Grand Eagles junction to improve safety and
encourage more walking, wheeling and cycling.
Auchterarder High Street – Dropped kerb improvements £13,705
Removal of existing uneven dropped kerbs across private access and
construction of continuous footways to improve access for walking and
wheeling, particularly those with mobility issues. 
Jeanfield Swifts Shared Use Path  £98,600
(part funded
by Paths for
All)
Construction of shared use path to provide missing link between existing
cycle infrastructure and Riverside stadium to encourage more active travel. 
Forgandenny Footpath  £38,354
Construction of footway along B935 to improve pedestrian safety to core of
the village. 
Dunkeld train station access improvements £50,000
Contribution to Network Rail for feasibility and design work for the
improvement of infrastructure to Dunkeld train station. 
Perth Road Birnam – Puffin Crossing and footways £20,008
Installation of a puffin crossing and footways on Perth Road Birnam to
improve pedestrian safety accessing to and from the school.  (Project spans
two financial years) 
Wardside Muthill – footway improvements £96,525
Construction of new footway and resurfacing existing footway to improve
pedestrian safety into Muthill Primary School. 
Stormont Road Scone – Dropped kerbs improvements £25,000
Installation of dropped kerbs along Stormont Road to improve pedestrian
access particularly for those with mobility issues. 
Staff costs  £86,049
Staff costs and miscellaneous design costs for projects not listed
Total  £635,765
Sustrans National Cycle Network Development Fund
Project  Costs
Tay Street Feasibility  £49,365
Feasibility study and business case to look at Active Travel infrastructure
improvements to Tay Street to link the North and South Inch which forms part
of the national cycle network 77 and 775.
Cycling Scotland – Cycle Parking Grant Fund
Location   Cycle Parking Provided  £170,257
Aberfeldy,
Breadalbane Terrace
Secure cycle parking for 10 bikes, PKC housing
9
Page 127 of 146

Page 128

Aberfeldy, Chapel
Street
Secure cycle parking for 6 bikes, managed by Tay Valley
Connnections
Aberfeldy, Town Hall Secure cycle parking for 6 bikes, managed by Tay Valley
Connnections
King George V Playing
fields
Bike shelter for 10 bikes
Crieff, Milnab St  Secure cycle parking for 10 bikes, PKC housing
Crieff, Murrayfield
Loan 
Secure cycle parking for 10 bikes, PKC housing
Errol, Park carpark,
next to Errol Parish
Church
Secure cycle parking for 6 bikes, managed by Errol
Community Council
Errol, next to bus stop
near Lass o Gowrie
Sheffield stand
Fearnan Two Sheffield stands
Glendoick Two Sheffield stands
Community School of
Auchterarder
Secure cycle storage for 20 bicycles with steel cladding
Arngask Village Hall
(Glenfarg)
Secure cycle parking for Glenfarg Freewheelers and bike
shelter for village hall and nearby bus stop
Perth, Bells (Giraffe) Secure cycle parking for 12 bikes for Giraffe
Perth, Carers Hub in
North Muirton
Secure cycle parking for 6 bikes for PKAVS
Pitlochry, Kennedy
Place hardstanding
Secure cycle parking for 10 bikes, PKC housing
Denmarkfield
allotments
Bike stand and planters for community allotments
Rattray, 1-30
Glenalmond Terrace
Secure cycle parking for 10 bikes, PKC housing
Rattray, 78-82
Glenalmond Road
Secure cycle parking for 10 bikes, PKC housing
St Madoes  Bike shelter by main bus stop
Walnut Grove  Hardstanding for bookable secure bike parking to be
installed in 2025/25
Watergate Toast rack for staff cycle parking
Pomarium Street Secure cycle parking for asylum seeker pool bikes
Jeanfield Swift -
Riverside - NCN
Hamble cycle shelter
Riverside Church Barratt Shelter with 4 stand toast rack (large space left for
oversized bike)
South Inch Barratt Shelter with 5 stand toast rack
Victoria Street / Scott
Street, PKC Housing 
10 cycle hamble c/w sliding gates and padlock (12 keys)
Dunkeld Road Shops 2 lots of two sub surface stainless steel sheffield stands
St Johnstouns
Building
10 cycle hamble c/w sliding gates and padlock (12 keys) 
Bells Sports Centre Install new stands and flashings to the door, to allow the
Bike Nests to hold larger e-bikes  
Page 128 of 146

Page 129

Local Authority Direct Award Grant – Transport Scotland
Project Costs
Active Travel Prioritisation Delivery Plan £24,997
Commissioning of Arup to produce the Active Travel Prioritisation Delivery
Plan report and methodology 
Cycle Path Maintenance  £10,000
Working in partnership with Roads Maintenance and CTLR contractor to carry
out cycle path maintenance. 
A94 and A824 Detailed Design work £85,406
Commissioning of consultants to carry out design work on A824 and A94
active travel routes. 
Total spent on Active Travel in Perth and Kinross 2024/25  £975,790 
Page 129 of 146

Page 130

Page 130 of 146

Page 131

Perth & Kinross Council
Perth & Kinross Active Travel Prioritisation 
Delivery Plan
Summary Report
Reference: REP / 001 
1 | 24 March 2025 
© Arup 
This report takes into account the particular instructions and requirements of our client.  It is not
intended for and should not be relied upon by any third party and no responsibility is undertaken to
any third party. 
Job number  305915-00
Ove Arup & Partners Limited
4th Floor  10 George Street
Edinburgh  EH2 2PF
United Kingdom
arup.com 
9
Page 131 of 146

Page 132

REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited 
Document Verification 
Project title Active Travel Prioritisation
Document title  Summary Report
Job number 305915-00
Document ref REP / 001 
File reference 001 
Revision Date Filename 
V1 26/03 Description First draft for client review 
Prepared by Checked by Approved by
Name Anna Dougan John Townsend Mark Bowman
Signature   
Filename 
Description 
Prepared by Checked by Approved by
Name   
Signature   
Filename 
Description 
Prepared by Checked by Approved by
Name   
Signature   
Issue Document Verification with Document  ✓ 
Page 132 of 146

Page 133

REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited 
Contents 
Click or tap here to enter text.  3
1. Introduction 1
1.1 Project Background 1
1.2 Report Structure 1
2. Multi-Criteria Assessment Methodology 3
2.1 Specifying the List of Routes 3
2.2 Data Collection / Compilation 3
2.2.1 ArcGIS Pro and Feature Manipulation Engine 4
2.3 Cost 4
2.4 Active Mode Appraisal Toolkit 4
2.5 Questions and Criteria 4
2.6 Scoring Method / Weighting 5
2.6.1 5/3/1 Criteria 6
2.6.2 Weightings 6
2.7 Collaboration 6
3. Prioritisation 10
4. Summary 10
4.1 Incorporating Additional Routes 10  
Click or tap here to enter text.
Tables 
Table 1: Data sources. 3
Table 2: Assessment Criteria. 5
Table 3: Scoring Criteria. 7
Table 4: List of projects ranked by standardised (per km) score, including tiering. 11 
Figures
Figure 1. Map of all routes within the MCA. The colours of the routes are to visually distinguish
between routes and have no other meaning. Routes with dashed lines are those which overlap at some
point with others. 2
Figure 2. Project Stages. 3 
Drawings
No table of figures entries found.
Page 133 of 146

Page 134

REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited 
Pictures 
No table of figures entries found. 
Photographs 
No table of figures entries found. 
Attachments 
No table of figures entries found. 
Page 134 of 146

Page 135

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited Summary Report Page 1 
1. Introduction
Arup has been commissioned by Perth and Kinross Council (PKC) to develop an Active Travel Prioritisation
Delivery Plan for active travel routes identified in masterplans and strategies across the PKC area, as well as
other route proposals developed by the PKC Network Team and local community groups.
1.1 Project Background
A number of Active Travel Masterplans (ATMs) have previously been developed for the Perth and Kinross
region. These include:
• Perth Cycle Network Masterplan (2018), which aims to create a coherent cycle network in Perth by
defining route alignments, identifying major destinations, and assessing the likely benefits.
• Kinross-shire Active Travel Masterplan (2024), which identifies and prioritises active travel
interventions to encourage short everyday journeys, as well as placemaking interventions.
• Tactran Regional Active Travel Network (2023), which establishes a framework for developing
regional active travel routes, with the aim of providing connections between settlements,
neighbourhoods, and major trip destinations. This covers the local authorities of Angus, Dundee
City, Perth and Kinross, and Stirling.
The interventions proposed in these masterplans are a starting point to enable PKC to identify funding
opportunities to develop feasibility and design of potential options, undertake public and stakeholder
consultation, and move towards implementation.
The purpose of this commission is to develop a robust and evidence-led Multi-Criteria Assessment (MCA) to
prioritise routes in the ATMs and additional routes identified by the PKC Network Team and local
community groups. The methodology used to develop the prioritisation is informed by and aligns with key
policies and objectives outlined in the Perth and Kinross Mobility Strategy. This strategy sets out future
direction and policy focus for transport in the Perth and Kinross Council area. 
1.2 Report Structure
This report summarises the methodology of the Multi-Criteria Assessment and the recommended prioritised
delivery of interventions.
1. Introduction
2. Multi-Criteria Assessment Methodology
3. Prioritisation
4. Summary  
Page 135 of 146

Page 136

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited Summary Report Page 2 
Figure 1. Map of all routes within the Multi Criteria Assessment Framework. The colours of the routes are to visually
distinguish between routes and have no other meaning. Routes with dashed lines are those which overlap at some
point with others.
Page 136 of 146

Page 137

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited Summary Report Page 3 
2. Multi-Criteria Assessment Methodology
This section outlines the evidence-led methodology that has been used to analyse and prioritise the routes. It
was agreed with PKC officers that a data led MCA was the most appropriate method to compare the routes
as it enables a consistent and transparent approach to comparing and prioritising interventions, while also
allowing for policy objectives to underpin and inform the process. The stages of the development of the
MCA, weighting and tiering can be seen in Figure 2. 
2.1 Specifying the List of Routes
It was agreed that only route-based interventions would be included as part of the prioritisation, and that
other types of active travel proposals (such as wayfinding, new crossings, cycle parking, etc.) would be
excluded. This was to ensure consistency in the scoring approach while also supporting the delivery of the
larger scale route-based interventions.
It was also decided that only the primary routes from the Perth Cycle Masterplan would be brought into the
prioritisation assessment. The secondary routes followed very similar alignments to the primary routes and
therefore would not provide significant differentiation in the scoring. 
The finalised list of 47 routes contained projects from the following strategies:
• Perth Cycle Network;
• Tactran regional Active Travel Network;
• Kinross-shire Active Travel Masterplan; and
• Additional Routes provided by PKC for inclusion in the MCA.
2.2 Data Collection / Compilation
Prior to undertaking the analysis and scoring, data was collated to understand the current transport,
demographic and economic context of the council area, as well as to inform the assessment process. Data
was sourced from a variety of publicly available open sources, as well as existing data from previous ATMs.
The routes were mapped in ArcGIS Pro, along with any supporting data sources. Table 1 outlines the data
which was used in the MCA.
Table 1: Data sources.
Type of Data Source
Adopted Road Boundary PKC
Typical Costs of Cycling Interventions Department for Transport (DfT), Office for
National Statistics, recent project experience
Railway Lines ArcGIS Open Data
Trunk Roads Transport Scotland
SIMD Scottish Government
Population National Records Scotland
Figure 2. Project Stages. Figure 2. Project Stages.
Page 137 of 146

Page 138

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited Summary Report Page 4 
Transport Hubs UK Government 
Collision Hotspots Department for Transport (DfT)
Amenities, Leisure, GPs, Hospitals, Green Spaces,
Schools
Open Street Map and Open Data – Improvement
Service
Employment Tactran Story Map
National Cycle Routes and Core Paths Sustrans Open Data, Scottish Government
Air Quality Management Area PKC
Rural Areas National Records Scotland
Car / Van Ownership National Records Scotland
Visitor Attractions Association of Leading Visitor Attractions
Urban / Rural Area Classifications Scottish Government
Planned Developments PKC
Active Travel Route Extents PKC, Tactran
Roads and Highways OS Open Data 
2.2.1 ArcGIS Pro and Feature Manipulation Engine
An ArcGIS Pro database was set up for use during the project. Any spatial data utilised was collated into this
database, to allow visual mapping of data alongside the routes. 
Given the number of projects being assessed and the data-driven approach to the MCA, a Feature
Manipulation Engine (FME) workspace was used to automate most of the processes outlined in Table 3.
FME is a software platform developed for geospatial data integration and can be used to automate data
processing and transformation tasks. This significantly improved the efficiency and accuracy of the
assessment process.
2.3 Cost
High level cost estimates for each route were developed using DfT cost estimates (2017) amended for
inflation using the ‘Building Cost Inflation Index’, as well as recent project experience. All estimates were
based on routes adhering to Cycle by Design guidance, such as having a protected space for cycling
alongside roads with high vehicle numbers and/or speeds.
2.4 Active Mode Appraisal Toolkit
After assessment of the available data and discussion with the PKC client team, it was agreed that the Active
Mode Appraisal Toolkit (AMAT) would not be used to calculate the Benefit Cost Ratio (BCR) of the routes.
This decision was taken both due to the lack of high-quality data required to accurately calculate the BCR,
but also as the MCA itself provided an assessment of the impact and costs of the proposed routes.
2.5 Questions and Criteria
The assessment criteria for the MCA were developed through:
• Reviewing assessment criteria used in the Perth, Kinross-shire, and Tactran active travel
masterplans;
• Aligning with Transport Planning Objectives in the PKC Mobility Strategy; 
• Applying best practise criteria relating to the delivery and impact of active travel routes; and 
Page 138 of 146

Page 139

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited Summary Report Page 5 
• Working with available data. For example, there was no available data relating to existing active
travel conditions on each route or potential political support meaning evidence led scores could not
developed based on these factors.
The eight assessment criteria selected to inform the MCA are shown in Table 2 below. 
Criteria Sub-Criteria Question
Deliverability  Adopted Road How much of the route is on PKC adopted road?
Cost What is the anticipated cost of the route?
Additional
Permissions
Will the route require significant additional
permissions? E.g. from Network Rail or Transport
Scotland? 
Social Deprivation SIMD 1-2 Will the route serve areas with high levels of
deprivation? 
Potential Users Population How many people will be able to access the route? 
Public Transport Transport Hubs Does the route connect to the wider public transport
network? 
Safety Collision Hotspots Will the route improve safety in an area with frequent
road traffic accidents? 
Connectivity  Amenities / Leisure Does the route connect people to amenities and leisure
facilities? 
Employment Does the route connect people to their workplaces? 
Access to GPs Does the route connect people to GPs? 
Access to Hospitals Does the route connect people to hospitals? 
Education Does the route provide a safe connection to schools and
educational facilities? 
Planned Developments Will the route provide connections to new
developments? 
Other Active Travel
Infrastructure
Does the route connect with the wider active travel
network?   
Air Quality
Management 
AQMA Will the route help to reduce traffic in areas with poor
air quality? 
Rurality Rural area Does the route provide connections to rural areas? 
Table 2: Assessment Criteria.
For each of the criteria and sub-criteria a data-driven methodology was developed to quantify the impact of
each proposed route. Refining the criteria was an iterative process dependant on the usability and availability
of recent, high-quality data, as well as continuous input from PKC officers.
The scoring approach for each of the criteria has been specified in as much detail as possible, to remove any
subjectivity from the scoring. Table 3 shows the MCA criteria name, the relevant question, and the
methodology used for scoring.
2.6 Scoring Method / Weighting
Each of the sub-criteria was given a score of high/medium/low (5/3/1) based on the methodology outlined in
Table 3. Key scoring metrics (such as counts of amenities, population, and distance to key sites) were
Page 139 of 146

Page 140

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 24 March 2025 | Ove Arup & Partners Limited Summary Report Page 6 
calculated using an automated FME workflow, as described in Section 2.2.1. Scores of 5/3/1 were then
assigned in the MCA Workbook Excel file based on the scoring thresholds set out in Table 3. 
Given that some of the criteria have multiple sub-criteria, the following formula was used to ensure that each
of the criteria had an equal weighting in the final score:
Criteria Score = Sum of sub-criteria scores / Number of Sub-Criteria
The final score for each route was the sum of all the criteria scores, divided by the length of the route. The
“per KM” approach was agreed in collaboration with PKC officers to ensure that the prioritisation was not
biased towards longer routes.
2.6.1 5/3/1 Criteria
The following approach was taken to ensure consistency when choosing thresholds for the scores of one,
three, or five:
• Where the raw data for a given criteria was within a small range of integer values, the score
thresholds were chosen manually to obtain a reasonable spread. For example, almost all routes were
near either zero, one, or two schools, and so the following thresholds were chosen to assign scores in
a way which split the data evenly:
o Score 1: Near zero schools.
o Score 3: Near one or two schools.
o Score 5: Near more than two schools.
• Where the raw data for a given criteria had a broad range of values, the score thresholds were set at
the 30th and 70th percentile values of the range of the data recorded. This approach was chosen to
maintain consistency when scoring across a varied range of criteria, and to ensure that outlying
values did not unfairly skew the thresholds for what was considered a high, medium or low score.
An exception was made to this approach when the raw data for a given criteria contained a
significant number of zero-values. In this case, a score of one was given to any route with a value of
zero, and the cut-off between a score of three and five was the 50th percentile non-zero value.
Details of the scoring thresholds for each criteria can be found in Table 3.
2.6.2 Weightings
To tailor the results of the MCA to support different planning objectives, a variable weighting approach was
tested, where different criteria could be given a higher or lower weighting in the final score. A range of
different approaches were tested, including weighting all criteria equally, prioritising deliverability over all
other criteria, and weighting each criteria according to how well they aligned with the PKC Mobility
Strategy Transport Planning Objectives. It was found that varying the weightings had a negligible impact on
the final rankings, and so an equal weighting was chosen for the final prioritisation results. 
Note that the weightings can still be adjusted in the accompanying Excel Workbook.
2.7 Collaboration
As previously mentioned, the development of the MCA was an iterative process which involved regular
collaboration with the PKC officers to refine and finalise the methodology. In addition to an online inception
meeting there were regular online catch-up meetings to discuss project progress and make key decisions. 
An in-person workshop was held on 6th February 2025 in the PKC office in Pullar House, Perth with PKC
officers, including representatives from planning, roads, and greenspace teams. The purpose of this
workshop was to share the draft MCA and prioritisation, and to discuss potential changes to weighting the
scores.
Page 140 of 146

Page 141

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 28 February 2025 | Ove Arup & Partners Limited Summary Report Page 7 
Table 3: Scoring Criteria.
Criteria Sub-Criteria Methodology 1 3 5
Deliverability  Adopted Road The total length of the route which
is not within the PKC Adopted
Highway Boundary, and is not on a
trunk road.
Greater than 0.8km. Between 0.1 and 0.8km
(where 0.1km is the
lowest non-zero value,
and 0.8km is the 50th
percentile non-zero
value).
0km.
Cost High level cost estimate for
delivering the route to Cycle by
Design guidance (e.g. protected
space for cycling alongside roads
with high vehicle volumes and/or
speeds). Cost estimates developed
using DfT cost estimates (2017)
amended for inflation using the
'Building Cost Inflation Index'
combined with recent project
experience.
The estimated cost of the
route is greater than
£8,695,520. 
The estimated cost is
between £5,553,160 and
£8,695,520 (where
£8,695,520 is the 70th
percentile value).
The estimated cost of the
route is less than
£5,553,160 (the 30th
percentile value).
Additional
Permissions
(such as
Network Rail
or Transport
Scotland)
The number of times a route
crosses under or over a railway. 
The length of route within 100m of
a trunk road.
The route crosses a
railway line in more than
one location.
The route crosses a
railway line in one
location.
The route does not cross
a railway line.
More than 0.8km of
route aligns with a trunk
road.
Between 0.04km and
0.8km of the route
(where 0.04km is the
smallest non-zero length,
and 0.8km is the 50th
percentile non-zero
length) aligns with a
trunk road.
The route does not align
with a trunk road.
Social
Deprivation
SIMD 1-2 The length of each route within
Data Zones with SIMD score of 1-
2.
0km. Between 0.01km and
0.17km (where 0.01km is
the lowest non-zero
score, and 0.17 is the
50th percentile non-zero
score).
Greater than 6.315km.
Page 141 of 146

Page 142

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 28 February 2025 | Ove Arup & Partners Limited Summary Report Page 8 
Criteria Sub-Criteria Methodology 1 3 5
Potential
Users
Population Each route had a 400m buffer
applied. For each route, the
population metric was the sum of
the proportion of the population of
each Output Area within the buffer.
Fewer than 888 people. Between 888 and 3804
people (30th and 70th
percentile).
Greater than 3804
people.
Public
Transport
Transport hubs An 800m buffer was applied to
each route. The total number of
park and rides, railway stations and
bus stations within the buffer was
used as the scoring metric.
Zero public transport
hubs.
One or two public
transport hubs.
Greater than two public
transport hubs.
Safety Collision
Hotspots
The number of collision "hot-spots"
within a 100m buffer of each route,
with a hot-spot defined as three or
more collisions with a 100m
diameter circle.
Zero collision hotspots. One collision hot spot. More than one collision
hot spot.
Connectivity  Amenities /
leisure
The total number of amenities
within a 100m buffer of the route.
Amenities include community
centres, shops, pharmacies, police
stations, places of worship, post
offices, cafes, cinemas, etc.
Fewer than 3.5 amenities
(where 3.5 is the 30th
percentile count).
Between 3.5 and 20.5
amenities (where 20.5 is
the 70th percentile
count).
Greater than 20.5
amenities.
Employment The total number of jobs at major
employment sites within a 400m
buffer of the route. 
Zero jobs Between 640 and 2605
jobs (where 640 is the
smallest non-zero value,
and 2605 is the 50th
percentile non-zero
value).
Greater than 2605 jobs.
Access to GPs Total number of GPs within an
800m buffer of the route.
No GPs. One or two GPs. Greater than two GPs.
Access to
Hospitals
Total number of hospitals within an
800m buffer of the route.
Zero hospitals. One hospital. More than one hospital.
Education Total number of educational
facilities (primary schools,
secondary schools, higher and
further education facilities) within a
200m buffer of the route.
No educational facilities. One or two educational
facilities.
Greater than two
educational facilities.
Page 142 of 146

Page 143

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 28 February 2025 | Ove Arup & Partners Limited Summary Report Page 9 
Criteria Sub-Criteria Methodology 1 3 5
Connectivity
(continued)
Planned
Developments
Total number of "Proposed" or
"Major" developments within a
400m buffer of the route. 
One or fewer proposals
or developments.
Two or three proposals
or developments.
Greater than three
proposals or
developments.
Other AT
Infrastructure
Total length of the route which
overlaps with the National Cycle
Network, Core Path Network or
River Tay Way, with a 100m buffer
applied. 
A separate 5/3/1 score was
calculated for the three
infrastructure types, and the final
score was the average of these
three, rounded to the nearest of one,
three or five.
0km NCN overlap. Between 0.2km and
0.66km (where 0.2km is
the lowest non-zero
value, and 0.66km is the
50th percentile non-zero
value).
Greater than 0.66km.
Less than 1.225km Core
Path overlap (where
1.225km is the 30th
percentile value).
Between 1.225km and
3.470km Core Path
overlap (where 3.470km
is the 70th percentile
value).
Greater than 3.470km
overlap with Core Paths.
0km RTW overlap. Between 0.2km and
0.74km RTW overlap
(where 0.2km is the
smallest non-zero value,
and 0.74km is the 50th
percentile non-zero
value).
Greater than 0.74km
RTW overlap.
Air Quality
Management 
AQMA Total length of the route within the
Perth Air Quality Management
Area.
0km in AQMA. Between 0.090km and
2.88km in AQMA
(where 0.09km is the
smallest non-zero value,
and 2.88km is the 50th
percentile non-zero
value).
Greater than 2.88km in
AQMA.
Rurality Rural area The total length of the route in rural
Data Zones.
Less than 2.34km in a
rural area (where 2.34km
is the 30th percentile
value).
Between 2.34 km and
7.21km in a rural area
(where 7.21km is the
70th percentile value).
Greater than 7.21km in a
rural area.
Page 143 of 146

Page 144

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 28 February 2025 | Ove Arup & Partners Limited Summary Report Page 10 
3. Prioritisation
After each route had been scored and weighted the final ranked list was split into three tiers to clearly
distinguish a group of priority projects and allow opportunity for a strategic approach to delivery which
builds upon the MCA.
The first tier was defined by the significant difference in score between the top seven routes and the
remaining list. The second and third tiers were defined to ensure an even split between the remaining tiers. 
The final ranked list of routes, including tiering, can be found in Table 4.
4. Summary
The prioritisation methodology resulted in the identification of 7 first tier routes, 20 second tier routes, and
19 third tier routes.
The additional routes provided by the PKC Network Team and those within the Perth Cycle Masterplan all
received high scores. This is due to their relatively short length and proximity to areas with high population
density and onwards connectivity, meaning they score highly in terms of deliverability and impact.
4.1 Incorporating Additional Routes
The Excel Workbook allows for the incorporation of future additional routes into the existing prioritisation
by manually inputting the relevant raw data. Note that this will require the user to generate their own data,
however the calculation of scores will be automated by the Workbook. 
Note that the existing data and score thresholds specified within the workbook are representative of January
and February 2025, and so a fair comparison with newer projects and project data may not be possible if
newer data sources are used for future projects and the scoring is not updated for all routes.
Page 144 of 146

Page 145

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 28 February 2025 | Ove Arup & Partners Limited Summary Report Page 11 
Table 4: List of projects ranked by standardised (per km) score, including tiering.
Tier  Project ID Masterplan Description Overall
Score
Per
km
Score
Route
Length
(km) 
Tier 1 
1 AD3 Additional Routes Tay Street to North Inch 22.0 27.5 0.8 
1 AD4 Additional Routes Marshall Place Road 21.7 27.1 0.8 
1 Phase 2 ID 20  Kinross-shire AT masterplan Between Kinross Park & Ride and Kinross High Street 18.9 26.9 0.7 
1 AD2 Additional Routes Woodside to Coupar Angus Phase 2 12.0 15.0 0.8 
1 AD7 Additional Routes Errol To Grange  12.6 14.0 0.9 
1 AD1 Additional Routes Scone to Scone Airport 16.3 11.6 1.4 
1 Phase 3 ID 34 Kinross-shire AT masterplan Kinross and Milnathort  24.0 9.6 2.5 
Tier 2 
2 PCN_6 Perth Cycle Network Burghmuir to City Centre - Burghmuir Jeanfield Road 22.7 7.6 3 
2 PCN_5 Perth Cycle Network Broxden to City Centre - Glasgow Road A83 31.9 7.3 4.4 
2 PCN_2 Perth Cycle Network Scone to City Centre - Scone Road A94 31.8 6.8 4.7 
2 AD5 Additional Routes The Feus A824 12.0 6.7 1.8 
2 PCN_3 Perth Cycle Network Walnut Grove to City Centre - Dundee Road A85 27.9 6.6 4.2 
2 PCN_7 Perth Cycle Network Burghmuir to City Centre - Burghmuir Jeanfield Road 33.4 4.7 7.1 
2 AD6 Additional Routes Errol to Errol Station  16.5 4.6 3.6 
2 PCN_1 Perth Cycle Network Luncarty to City Centre - Dunkeld Road A9 A912 30.5 4.1 7.4 
2 PCN_4 Perth Cycle Network Bridge of Earn to City Centre - Edinburgh Road A912 33.1 4.0 8.2 
2 Phase 3 ID 38  Kinross-shire AT masterplan Wester Balgedie and Milnathort   16.3 3.5 4.6 
2 P16 Tactran Regional AT Network Methven to Almondbank 18.8 3.1 6 
2 P12 Tactran Regional AT Network
Stanley to Bankfoot (PKC and Cairngorms National Park
Authority) 18.7 3.1 6 
2 P5 Tactran Regional AT Network Blairgowrie - Craigie  21.3 3.0 7 
2 D3 Tactran Regional AT Network
Inchture to Ninewells (PKC, Dundee & Perth & Kinross
Countryside Trust) 21.3 2.8 7.5 
2 P21 Tactran Regional AT Network Abernethy to Newburgh 15.5 2.8 5.5 
2 P4 Tactran Regional AT Network Coupar Angus to Blairgowrie 21.0 2.8 7.5 
2 P10 Tactran Regional AT Network
Pitlochry to Killiecrankie (PKC and Cairngorms National Park
Authority) 18.4 2.6 7 
Page 145 of 146

Page 146

Perth & Kinross Council Active Travel Prioritisation
REP / 001 | 1 | 28 February 2025 | Ove Arup & Partners Limited Summary Report Page 12 
2 P9 Tactran Regional AT Network
Logierait to Pitlochry (PKC and Cairngorms National Park
Authoirty) 22.0 2.5 8.7 
2 P3 Tactran Regional AT Network Alyth - Blairgowrie 21.3 2.5 8.5 
2 Phase 3 ID 40  Kinross-shire AT masterplan Gateside Farm and Cleish 10.7 2.5 4.3 
Tier 3 
3 P20 Tactran Regional AT Network Bridge of Earn to Abernethy  17.2 2.5 7 
3 P13 Tactran Regional AT Network
Bankfoot to Dunkeld (PKC and Cairngorms National Park
Authority) 24.1 2.4 10 
3 P1 Tactran Regional AT Network Walnut Grove to St Madoes (PKC & Countryside Trust) 15.6 2.4 6.5 
3 Phase 3 ID 35  Kinross-shire AT masterplan Kinross-shire to Fife 17.9 2.3 7.7 
3 P14 Tactran Regional AT Network
Stanley to Luncarty (PKC and Cairngorms National Park
Authority) 18.1 2.3 8 
3 P17 Tactran Regional AT Network Broxden to Forteviot 19.2 2.1 9 
3 Phase 3 ID 33 Kinross-shire AT masterplan
National Cycle Network Route 775 between Glenfarg and
Glenfarg Railway Tunnels Circular Route 13.9 2.0 6.8 
3 Phase 3 ID 43  Kinross-shire AT masterplan Gairney Bank, Scotlandwell, and the Westfield Energy Park 13.0 2.0 6.5 
3 P15 Tactran Regional AT Network Crieff to Comrie 20.6 1.9 11 
3 P6 Tactran Regional AT Network Craigie to Dunkeld 18.5 1.8 10 
3 S1 Tactran Regional AT Network Dunblane to Braco 22.1 1.8 12.5 
3 P18 Tactran Regional AT Network Forteviot to Auchterarder 20.6 1.6 12.5 
3 Phase 3 ID41  Kinross-shire AT masterplan Gairney Bank, Scotlandwell, and the Westfield Energy Park 14.7 1.6 9.2 
3 P11 Tactran Regional AT Network
Killiecrankie to Pitagowan (PKC and Cairngorms National Park
Authority) 19.0 1.6 12 
3 P19 Tactran Regional AT Network Auchterarder to Braco  18.4 1.4 13 
3 P2 Tactran Regional AT Network St Madoes - Inchture (PKC & Countryside Trust) 17.4 1.4 12.5 
3 P8 Tactran Regional AT Network Logierait to Dunkeld 20.8 1.4 15 
3 Phase 3 ID 42  Kinross-shire AT masterplan Kinross-shire and Clackmannanshire  17.1 1.4 12.4 
3 P7 Tactran Regional AT Network Alberfeldy to Logierait 18.7 1.2 16 
Page 146 of 146