Appendix 1 – Active Travel Infrastructure 2024/25 
Active Travel Infrastructure – Tier 1
Project  Costs
Signalised junction West Moulin Road/Atholl Road in Pitlochry.  £78,020
Construction of signalised junction at the junction of West Moulin Road and
Atholl Road in Pitlochry to improve pedestrian safety.
Auchterarder Shared Use Path £129,504
Construction of shared use path and green route on at the A824 from the
town boundary to B8062 Grand Eagles junction to improve safety and
encourage more walking, wheeling and cycling.
Auchterarder High Street – Dropped kerb improvements £13,705
Removal of existing uneven dropped kerbs across private access and
construction of continuous footways to improve access for walking and
wheeling, particularly those with mobility issues. 
Jeanfield Swifts Shared Use Path  £98,600
(part funded
by Paths for
All)
Construction of shared use path to provide missing link between existing
cycle infrastructure and Riverside stadium to encourage more active travel. 
Forgandenny Footpath  £38,354
Construction of footway along B935 to improve pedestrian safety to core of
the village. 
Dunkeld train station access improvements £50,000
Contribution to Network Rail for feasibility and design work for the
improvement of infrastructure to Dunkeld train station. 
Perth Road Birnam – Puffin Crossing and footways £20,008
Installation of a puffin crossing and footways on Perth Road Birnam to
improve pedestrian safety accessing to and from the school.  (Project spans
two financial years) 
Wardside Muthill – footway improvements £96,525
Construction of new footway and resurfacing existing footway to improve
pedestrian safety into Muthill Primary School. 
Stormont Road Scone – Dropped kerbs improvements £25,000
Installation of dropped kerbs along Stormont Road to improve pedestrian
access particularly for those with mobility issues. 
Staff costs  £86,049
Staff costs and miscellaneous design costs for projects not listed
Total  £635,765
Sustrans National Cycle Network Development Fund
Project  Costs
Tay Street Feasibility  £49,365
Feasibility study and business case to look at Active Travel infrastructure
improvements to Tay Street to link the North and South Inch which forms part
of the national cycle network 77 and 775.
Cycling Scotland – Cycle Parking Grant Fund
Location   Cycle Parking Provided  £170,257
Aberfeldy,
Breadalbane Terrace
Secure cycle parking for 10 bikes, PKC housing

Page 2

Aberfeldy, Chapel
Street
Secure cycle parking for 6 bikes, managed by Tay Valley
Connnections
Aberfeldy, Town Hall Secure cycle parking for 6 bikes, managed by Tay Valley
Connnections
King George V Playing
fields
Bike shelter for 10 bikes
Crieff, Milnab St  Secure cycle parking for 10 bikes, PKC housing
Crieff, Murrayfield
Loan 
Secure cycle parking for 10 bikes, PKC housing
Errol, Park carpark,
next to Errol Parish
Church
Secure cycle parking for 6 bikes, managed by Errol
Community Council
Errol, next to bus stop
near Lass o Gowrie
Sheffield stand
Fearnan Two Sheffield stands
Glendoick Two Sheffield stands
Community School of
Auchterarder
Secure cycle storage for 20 bicycles with steel cladding
Arngask Village Hall
(Glenfarg)
Secure cycle parking for Glenfarg Freewheelers and bike
shelter for village hall and nearby bus stop
Perth, Bells (Giraffe) Secure cycle parking for 12 bikes for Giraffe
Perth, Carers Hub in
North Muirton
Secure cycle parking for 6 bikes for PKAVS
Pitlochry, Kennedy
Place hardstanding
Secure cycle parking for 10 bikes, PKC housing
Denmarkfield
allotments
Bike stand and planters for community allotments
Rattray, 1-30
Glenalmond Terrace
Secure cycle parking for 10 bikes, PKC housing
Rattray, 78-82
Glenalmond Road
Secure cycle parking for 10 bikes, PKC housing
St Madoes  Bike shelter by main bus stop
Walnut Grove  Hardstanding for bookable secure bike parking to be
installed in 2025/25
Watergate Toast rack for staff cycle parking
Pomarium Street Secure cycle parking for asylum seeker pool bikes
Jeanfield Swift -
Riverside - NCN
Hamble cycle shelter
Riverside Church Barratt Shelter with 4 stand toast rack (large space left for
oversized bike)
South Inch Barratt Shelter with 5 stand toast rack
Victoria Street / Scott
Street, PKC Housing 
10 cycle hamble c/w sliding gates and padlock (12 keys)
Dunkeld Road Shops 2 lots of two sub surface stainless steel sheffield stands
St Johnstouns
Building
10 cycle hamble c/w sliding gates and padlock (12 keys) 
Bells Sports Centre Install new stands and flashings to the door, to allow the
Bike Nests to hold larger e-bikes

Page 3

Local Authority Direct Award Grant – Transport Scotland
Project Costs
Active Travel Prioritisation Delivery Plan £24,997
Commissioning of Arup to produce the Active Travel Prioritisation Delivery
Plan report and methodology 
Cycle Path Maintenance  £10,000
Working in partnership with Roads Maintenance and CTLR contractor to carry
out cycle path maintenance. 
A94 and A824 Detailed Design work £85,406
Commissioning of consultants to carry out design work on A824 and A94
active travel routes. 
Total spent on Active Travel in Perth and Kinross 2024/25  £975,790