Our vision is a Perth and Kinross where everyone can live life well,
free from poverty and inequality 
___________________________________________________________________  
Committee or Board: Economy and Infrastructure Committee 
Date of Meeting: 28 May 2025 
Report Title: LDP3 Development Plan Scheme 
Report Number: 25/128 
Report Author: Brenda Murray, Local Development Plan Team
Leader 
Organisational Lead: Serge Merone, Strategic Lead – Economy,
Development and Planning
___________________________________________________________________ 
1. Purpose 
1.1 This report seeks approval for the updated statutory Development Plan
Scheme (DPS) which proposes a revised timetable for the preparation of the
next Perth and Kinross Local Development Plan (LDP3). The last update was
approved by the Economy and Infrastructure Committee on 21 October 2024
(report 24/284 refers). It also highlights the recent addendum prepared in
relation to the LDP2 Delivery Programme for noting. 
1.2 Sections 
1. Purpose
2. Recommendations
3. Background/Context
4. Main Issues
5. Proposals
6 Conclusion
7. Impact and Value Assessment
8. Appendices 
2. Recommendations 
It is recommended that the Committee: 
2.1 agrees the updated Perth & Kinross Council Development Plan Scheme 
2.2 authorises the Strategic Lead – Economy, Development and Planning to
submit the Scheme to the Scottish Ministers;

Page 2

2.3 notes the publication of the addendum to the Delivery Programme for LDP2 
3. Background/Context 
3.1  A Development Plan Scheme is a document setting out a planning authority’s
programme for preparing and reviewing their Local Development Plan (LDP).
The Planning Authority is required to update its Development Plan Scheme at
least annually. The last update was approved by the Economy and
Infrastructure Committee on 21 October 2024 (report 24/284 refers). 
3.2 Since publishing the Development Plan Scheme a significant milestone has
been reached with the approval of the Evidence Report for LDP3 by Council
in March of this year. Following approval, the Evidence Report was submitted
to Scottish Ministers on 27 March 2025 for the Gate Check review and on 9
April 2025 Scottish Ministers appointed Stephen Hall BA(Hons) BPI MRTPI to
consider whether the Evidence Report contains sufficient information to
enable the Council to prepare LDP 3. 
3.3 Following submission of the Evidence Report, it was considered prudent to
revisit the timetable for the remainder of the plan preparation process. The
timetable is a best estimate of when the various stages of the plan making
process will be reached and, on that basis, is indicative and should be subject
to regular review. The Development Plan Scheme must detail, by financial
quarters, when various parts of the Local Development Plan will be produced,
and if there are any changes to the timetable then those changes are
legislatively required to be detailed in future Development Plan Schemes
alongside the reasons why the timetable has been changed. 
3.4 Stepping back to LDP2, and its Delivery Programme was last updated in
February 2024. Since then, there has been a specific requirement from
Scottish Ministers for delivery programmes to include the ‘sequencing of, and
timescale for, the delivery of housing sites allocated in local development
plans’ (Chief Planner Letter – June 2024). An addendum to the LDP2 Delivery
Programme (Appendix 3) has therefore been prepared to establish a housing
land pipeline for the delivery of housing sites allocated in LDP2. The
addendum does not alter the content of the Delivery Programme but provides
the existing information in a format prescribed by the Scottish Ministers. It is
included within this report for noting purposes only. 
4. Main Issues 
4.1 On reviewing the timetable and considering the tasks to be undertaken during
the following stages in the process, it is considered that more time is required
to prepare the Proposed Plan, and that the following stages to adoption will be
quicker than anticipated in the current Development Plan Scheme. 
4.2 The overall timeframe as it currently stands in the Development Plan Scheme
2024 (Appendix 1 pages 4-5) remains unchanged with adoption of LDP3 late
2027.

Page 3

5. Proposals 
5.1 There is a significant amount of work to be undertaken to prepare the
Proposed Plan including: ‘Call for Sites’; Locality Profiles; Urban Capacity
Study; Green Belt Review; identifying Nature Networks; site assessments;
Transport Appraisal; identifying 20-minute neighbourhoods; developing local
policy and place proposals; Strategic Environmental Assessment; and
preparation of the Plans Delivery Programme. 
5.2 Many of the tasks will require collaboration with stakeholders not just
internally across Council Services to reflect the corporate role of the plan, but
externally with key agencies, communities, infrastructure providers, the
development industry and landowners. 
5.3 By taking the time to encourage engagement and work collaboratively
throughout plan preparation, this should deliver a plan which meets with
greater consensus and fewer representations when published for
consultation. The pathway for collaboration has already been established
through the early engagement on the Evidence Report by way of the Big
Place Conversation, Topic Paper Consultation and targeted engagement and
this will be built upon throughout preparation of the Proposed Plan. 
5.4 In addition, the assessment of the Evidence Report through the Gate Check
process should reduce the level of debate arising at the Examination at the
end of the plan preparation period. With this in mind, the timetable has been
revised to allocate more time to preparing the Proposed Plan and less time for
the period of examination to adoption. 
5.4 The updated Development Plan Scheme in Appendix 2 (pages 4 & 5) shifts
the balance of time across the LDP preparation timeframe to provide 21
months for Proposed Plan preparation (April 2025 - December 2026) and 12
months for the period of Proposed Plan consultation to adoption (January
2027 – December 2027), whilst still allowing some leeway for the current
Scottish Government deadline of May 2028 for an up-to-date LDP being in
place. 
6 Conclusion 
6.1 A review of the timetable for preparation of LDP3 has highlighted an
imbalance in the timescales afforded to the remaining stages of plan
preparation. The significant workload and requirement for collaborative
preparation necessitates more time to be afforded to the Proposed Plan
preparation and less to the later stages of Examination and Adoption. The
date for adoption remains unchanged. 
7. Impact and Value Assessment 
https://www.pkc.gov.uk/media/53944/LDP3-Development-Plan-
Scheme/pdf/LDP3_Development_Plan_Scheme.pdf?m=1744812380233

Page 4

8. Appendices 
8.1 Appendix 1 – Perth & Kinross Development Plan Scheme 2024 
8.2 Appendix 2 – Perth & Kinross Development Plan Scheme 2025 
8.3 Appendix 3 – Perth & Kinross Local Development Plan 2: Delivery
Programme 2019-2029 Addendum: 31 March 2025 Housing Land Pipeline