Agenda Document Pack - Economy and Infrastructure Committee - 21/10/2024

Perth and Kinross Council · 21 October 2024
Back to Economy and Infrastructure Committee — 21 October 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
14/10/2024 
A hybrid meeting of the Economy and Infrastructure Committee will be held in the
Council Chamber on Monday, 21 October 2024 at 13:00. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Eric Drysdale  (Convener)
Councillor Jack Welch  (Vice-Convener)
Councillor Hugh Anderson
Bailie Alasdair Bailey
Councillor Steven Carr
Councillor Stewart Donaldson
Councillor John Duff
Councillor Angus Forbes
Councillor Ken Harvey
Councillor Noah Khogali
Councillor Grant Laing
Bailie Claire McLaren
Councillor Willie Robertson
Councillor Frank Smith
Councillor Colin Stewart
Page 1 of 56

Page 2

Page 2 of 56

Page 3

Economy and Infrastructure Committee 
Monday, 21 October 2024 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES/SUBSTITUTES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF THE ECONOMY AND
INFRASTRUCTURE COMMITTEE OF 28 AUGUST 2024 FOR
APPROVAL
(copy herewith) 
5 - 8 
4 OUTSTANDING BUSINESS STATEMENT
(copy herewith 24/283) 
9 - 10 
5 PERTH AND KINROSS LOCAL DEVELOPMENT PLAN (LDP3)
DEVELOPMENT PLAN SCHEME
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 24/284) 
11 - 42 
6 PERTH AND KINROSS OUTDOOR ACCESS FORUM ANNUAL
REPORT 2023-24
Report by Strategic Lead - Housing and Communities (copy
herewith 24/285) 
43 - 56 
Page 3 of 56

Page 4

Page 4 of 56

Page 5

ECONOMY & INFRASTRUCTURE COMMITTEE 
Minute of hybrid meeting of the Economy and Infrastructure Committee held in the
Council Chambers on Wednesday 28 August 2024 at 9:30am. 
Present: Bailies A Bailey and C McLaren, Councillors H Anderson, S Carr, B Brawn
(Substituting for N Khogali), C Stewart, E Drysdale, J Duff, A Forbes, K Harvey,
D Illingworth (Substituting for F Smith), G Laing, W Robertson, C Stewart and
J Welch. 
In Attendance: F Crofts, Strategic Lead – Environment and Infrastructure,
D Littlejohn, Strategic Lead – Economy, Development and Planning, S D’All,
R Stewart, D McKeown, S Skene, H Hope, C McLaren, K Divin, K Walker (all
Economy, Place and Learning); J Guild, S Hendry, A Brown and M Pasternak (all
Strategy, People and Resources). 
Apologies for Absence: Councillors N Khogali and F Smith. 
Councillor E Drysdale, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Convener welcomed everyone to the meeting.  Apologies for absence were
noted as above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interests in terms of the Councillors’ Code of
Conduct. 
3. MINUTE OF MEETING OF ECONOMY AND INFRASTRUCTURE
COMMITTEE OF 29 MAY 2024 
The minute of the meeting of the Economy and Infrastructure Committee of 29
May 2024 was submitted and approved as a correct record. 
4. OUTSTANDING BUSINESS STATEMENT 
Resolved: 
The status of actions in the Outstanding Business Statement (24/232) be
noted and completed actions removed accordingly. 
5. ROAD GULLY CLEANSING 
There was submitted a report by Strategic Lead – Environment and
Infrastructure (24/233) (1) reporting on progress and performance on gully cleansing
over the last few years, also (2) covering the gully function/disposal
mechanism/cleansing/capacity/performance and costs and (3) detailing issues and
barriers to achieving targets. 
3
Page 5 of 56

Page 6

Resolved:
(i) The content of the report in relation to the gully cleansing activity
performance, the actual purpose of a road gully, how it operates and its
limitations in mitigating flooding occurring, be noted.
(ii) It be noted that no enhancement to the activity is recommended by officers
but if any enhancement is required, then additional labour and financial
resource would be required to achieve it. 
The Convener referred to this being the last meeting of this Committee for
Stuart D’All, Road Maintenance Partnership Manager.  He thanked Stuart for the
contribution made to the work of this Committee over the years, for his years of
service to local government and wished him well for the future. 
6. PROPOSED WAITING RESTRICTIONS 
There was submitted a report by the Strategic Lead – Environment and
Infrastructure (24/234) advising Committee of the proposed Traffic Regulation Order
to introduce waiting restrictions on North Crofts in Auchterarder. 
Resolved:
(i) The objections received, be noted.
(ii) The Ward 7 Elected Members views in paragraph 4.7, be noted and the
objections be set aside.
(iii) The Order to promote the Waiting Restrictions on North Crofts, Green Crofts
and Hannover Gardens in Auchterarder, be made. 
THERE FOLLOWED A SHORT RECESS AND THE COMMITTEE RECONVENED
AT 10.55AM. 
7. SHORT-TERM LET AREA CONTROL PROPOSAL 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (24/235) seeking approval to commence the formal statutory process
to introduce a Short-term Let Control Area informed by the results of the 2023 non-
statutory consultation on the principle of a Control Area, and updated research by
housing experts Arneil Johnston using the Licence register of short-term lets (STLs). 
Motion by Councillors E Drysdale and J Welch 
To accept the recommendations as set out in the report. 
Amendment by Councillors A Forbes and J Duff 
Note the contents of the report but reject the recommendations and
proposals to proceed. 
In terms of Standing Order 21, a roll call vote was taken 
7 Members voted for the Motion as follows:
Bailie A Bailey, Councillors S Carr, S Donaldson, E Drysdale, K Harvey,
G Laing and J Welch.
Page 6 of 56

Page 7

8 Members voted for the Amendment as follows:
Bailie C McLaren, Councillors H Anderson, B Brawn, J Duff, A Forbes,
D Illingworth, W Robertson and C Stewart. 
Resolved:
In accordance with the Amendment.
Page 7 of 56

Page 8

Page 8 of 56

Page 9

ECONOMY & INFRASTRUCTURE COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 24/283) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No Minute
Reference
Subject Title Outstanding Actions Update Lead Officer
/Service
Action Due
/Complete
Action
Expected
14. 1 November
2023 (EIED
Committee)
Item 6
Short Term Let Non-
Statutory Planning
Guidance
A report relating to the
introduction of a Short
Term Let control area
be brought forward in
early 2024. 
Report submitted to
Committee 28 August
2024. 
Strategic Lead –
Economy,
Development and
Planning
COMPLETE 28 August
2024
15. 1 November
2023 (EIED
Committee)
Item 8
Policy and Level of
Service for Winter
2023/24
Conduct a review of
the process of gully
cleaning, open
discussions with SEPA
and representatives of
the farming and land
owning community and
to bring any potential
proposals for change
back to a future
committee before
summer recess 2024. 
Report submitted to
Committee 28 August
2024.
Strategic Lead –
Environment and
Infrastructure
COMPLETE 28 August
2024
16. 28 August
2024
Item 5
Road Gully
Cleansing
Public communications
to be released to raise
awareness of
landowner
responsibility in relation
to watercourses. 
Preparation ongoing in
conjunction with Bailie
McLaren for
engagement with
landowners.
Strategic Lead –
Environment and
Infrastructure
ONGOING End 2024
4
Page 9 of 56

Page 10

No Minute
Reference
Subject Title Outstanding Actions Update Lead Officer
/Service
Action Due
/Complete
Action
Expected
17. 28 August
2024
Item 5
Road Gully
Cleansing
Public communications
to be released to raise
awareness of gully
cleansing process. 
Video in relation to
Gully Cleansing has
been created and
released via Comms
Team on PKC Website
and social media
channels and will be
reshared over
autumn/winter period. 
Strategic Lead –
Environment and
Infrastructure
COMPLETE 21 October
2024
18. 28 August
2024
Item 5
Road Gully
Cleansing
Investigate technical
feasibility of publicising
gully cleansing and
monitoring data,
schedules and
performance. 
Work ongoing between
Roads, IT and software
provider to establish
viability, development
time and cost involved.
Strategic Lead –
Environment and
Infrastructure
ONGOING End 2024
19.  28 August
2024
Item 5
Road Gully
Cleansing
Report No. 24/233
Road Gully Cleansing
to be circulated to all
Elected Members and
Community Councils. 
Circulated to all Elected
Members and
Community Councils 28
August 2024.
Democratic
Services
COMPLETE 21 October
2024 
Page 10 of 56

Page 11

PERTH AND KINROSS COUNCIL 
Economy and Infrastructure Committee 
21 OCTOBER 2024 
PERTH AND KINROSS LOCAL DEVELOPMENT PLAN (LDP3) DEVELOPMENT
PLAN SCHEME 
Report by Strategic Lead – Economy, Development and Planning
(Report No. 24/284) 
1. PURPOSE 
1.1 This report seeks approval for the updated statutory Development Plan Scheme
(DPS) relating to the preparation of the next Perth and Kinross Local
Development Plan (LDP3). The last update was approved by the Environment,
Infrastructure and Economic Development Committee on 1 November 2023
(report 23/288 refers). It was agreed that an annual progress report be submitted
to committee detailing any changes to the Development Plan Scheme. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
• agrees the proposed Perth & Kinross Council Development Plan Scheme
incorporating the responses to consultation on the draft Participation
Statement; 
• authorises the Strategic Lead - Economy, Development and Planning to
submit the Scheme to the Scottish Ministers; and 
• remits the Place Strategies Manager & Chief Planning Officer (in post from 2
December 2024) to submit an annual progress report to the Economy &
Infrastructure Committee detailing any changes to the Development Plan
Scheme. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues 
• Section 5: Proposals 
• Section 6: Conclusion 
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1  A Development Plan Scheme is a document setting out a planning authority’s
programme for preparing and reviewing their Local Development Plan. Within
the Development Plan Scheme a participation statement is required which the
5
Page 11 of 56

Page 12

Town and Country Planning (Scotland) Act 1997, Section 20B (4) (c), sets out as
‘an account of when consultation is likely to take place and with whom and of its
likely form and of the steps to be taken to involve the public at large in the stages
of preparation or review.’ 
4.2 The Planning Authority is required to update its Development Plan Scheme
every year. The last update was approved by the Environment, Infrastructure
and Economic Development Committee on 1 November 2023 (report 23/288
refers). The Development Plan Scheme update for 2024 is attached as Appendix
1. 
4.3 The Development Plan Scheme sets out and explains each stage of preparing
the next Local Development Plan. The first stage concerns production of the
Evidence Report, and the Development Plan Scheme outlines in greater detail
how the Planning Service will organise and consult upon the Evidence Report. 
5. PROPOSALS 
5.1 Legislation requires planning authorities to seek the views of the public at large
and have regard to those views in terms of the content of the Participation
Statement. A Draft of the Participation Statement 2024 was consulted on from 9th
to 27th September 2024. Appendix 2 summarises the responses received and
provides the proposed response to them from the Council. 
5.2 A summary of the responses received to the consultation are set out below: 
• Comments on the list of stakeholders and people that require to be engaged
with in the preparation of the next Local Development Plan;
• Requests to be kept informed of Development Plan progress;
• Opportunity to engage with Council at all stages of plan preparation
welcomed; and
• A range of other issues relating to stages of the LDP such as, comments
relating to the content of the topic papers, site suggestions, comments on
housing matters and site assessment methodologies 
5.3 The majority of comments received relate to matters outwith the content of the
Participation Statement and respondents have been advised of the appropriate
stage in plan preparation to raise these issues. The responses which were
relevant to the Participation Statement focused on the list of stakeholders and
people that require to be engaged with in the preparation of the next Local
Development Plan. These were mainly requests for groups/representative
organisations to be specifically named within the Participation Statement. It is not
proposed to make any changes to the Participation Statement in this regard as
these groups/representative organisations fall within the broader categories of
“Communities of Interest” and “Landowners and Developers” currently included
within the Participation Statement. 
5.4 The Town and Country Planning (Development Planning) (Scotland) Regulations
2023, Regulation 22 (2), states that if the timetable included in a Development
Plan Scheme for a Local Development Plan differs from that identified within its
Page 12 of 56

Page 13

previous Development Plan Scheme, the Local Authority must identify these
changes and set out the reasons for them. 
5.5 The November 2023 Development Plan Scheme update aimed to have the next
Local Development Plan adopted by Q3 2027 (Oct-Dec 2027). It included
timescales for the first stage of the process (production of the Evidence Report)
which, based on experience of the amount of work involved in compiling all the
necessary evidence during the intervening period, did not allow sufficient time for
this important stage of plan production. 
5.6 Significant progress has been made on the Evidence Report including
engagement with communities in the form of the Big Place Conversation and
consultation on policy themed topic papers including links to the proposed
evidence to be used to inform the Evidence Report. The success of these
engagement activities has been born out in the level of responses received
necessitating a lengthier period than anticipated for analysis, and inclusion
where appropriate, within the Evidence Report. 
5.7 While engagement overall has been good there were initial difficulties engaging
with Transport Scotland and NHS Tayside, both of which are key infrastructure
providers whose input to the Evidence Report is vital. They are complex
organisations and identifying who has the data within them has proved
challenging. Recent discussions with Transport Scotland have, however, proved
fruitful and led to collaborative working to ensure the required level of information
expected by Scottish Government on the state of transport infrastructure in the
area within the Evidence Report. 
5.8  Likewise, the current position with NHS Tayside is   also more encouraging in
that a meeting with Senior  officials  has recently taken place. Several key issues
were  discussed including: the immediate short-term need for NHS Tayside
support on the preparation of Evidence Reports in Perth & Kinross, Angus, and
Dundee; the short/medium-term need to progress the Draft Protocol for joint-
working on the key planning processes (LDP, Development Management, and
Contributions); and the medium/longer-term need to discuss, at a corporate
level, approaches to infrastructure planning and delivery in conjunction with
Planning/Property and Asset Management. Moving forward a follow up meeting
is to be held with relevant representatives from each Council, each HSCP and
NHS Tayside to progress these issues and most importantly to ensure we have
the necessary level of information for the Evidence Report. 
5.9 The Evidence Report is required to highlight areas where the authority is aware
through discussions, forums or exchanges that stakeholders agree or disagree
with the evidence, and the reasons for this. The aim is to have minimal areas of
dispute outstanding when submitting to the Scottish Ministers for the Gate Check
(assessment and approval to proceed) to minimise delay. Discussions with
stakeholders in this regard are currently ongoing. 
5.10 In addition, decisions have been issued by the Scottish Government’s
Department of Planning & Environmental Appeals (DPEA) in relation to the
consideration of Evidence Reports submitted by Fife Council and Moray Council.
Fife Council’s was considered insufficient and has been returned for further work
and re-submission to Gate Check.  Moray Council’s was considered sufficient to
Page 13 of 56

Page 14

allow them to progress preparation of their Proposed Plan, however, the
Reporter also highlighted further matters for them to address.  It is considered
prudent to take the time now to review and learn lessons from these two
decisions to improve our Evidence Report before submission, rather than take
the risk of having it returned for further work and re-submission. This approach is
further supported by the fact that the cost for the Gate Check, circa £12,500
each for Fife and Moray, is to be paid by the Planning Authority. 
5.11 Having taken account of these factors, the main change from the Development
Plan Scheme 2023 is that the updated Development Plan Scheme 2024 allows
approximately 6 additional months to produce the Evidence Report. However, it
then aims to recover this time by shortening later stages of plan production. This
means that the intended adoption date for the new Local Development Plan
remains unchanged at  Q3 2027 (Oct-Dec 2027). This is in line with Scottish
Government expectations for all local authorities to have a new style Local
Development Plan in place by May 2028. 
6. CONCLUSION 
6.1 The Development Plan Scheme has been drafted to update the Committee on
the preparation of the new Perth and Kinross Local Development Plan. It revises
the proposed timetable previously proposed in 2023 and sets out a participation
statement outlining the key stages of plan preparation and when engagement is
planned to take place. 
Author
Name  Designation Contact Details
Brenda Murray  Development Plan Team
Leader (Place Strategies)
(01738) 475000
EPLCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
David Littlejohn  Strategic Lead - Economy,
Development & Planning
11 October 2024 
APPENDICES 
Appendix 1 - Perth & Kinross Development Plan Scheme 2024
Appendix 2 - Local Development Plan Scheme Participation Statement Consultation
Responses 
Page 14 of 56

Page 15

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  None
Corporate Plan  None
Resource Implications  
Financial  None
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  None
Risk None
Consultation 
Internal  No
External  No
Communication 
Communications Plan  None 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report and the attached appendix have no direct impact on the Local
Outcomes Improvement Plan, although ultimately the implementation of the
Local Development Plan will. 
Corporate Plan 
1.2 This report and the attached appendix have no direct impact on the Corporate
Plan, although ultimately the implementation of the Local Development Plan will
particularly in relation to priorities i, iii and iv:- 
(i) Working in partnership with communities; 
(ii) Tackling poverty; 
(iii) Tackling climate change and supporting sustainable places; 
(iv) Developing a resilient, stronger, and greener local economy; 
(v) Enabling our children and young people to achieve their full potential;
(vi) Protecting and caring for our most vulnerable people;
(vii) Supporting and promoting physical and mental wellbeing. 
2. Resource Implications 
Financial 
2.1 None.  
Page 15 of 56

Page 16

Workforce 
2.2 None. 
Asset Management (land, property, IT) 
2.3 None. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate discrimination,
advance equality of opportunity, and foster good relations between equality
groups.  Carrying out Equality Impact Assessments for plans and policies allows
the Council to demonstrate that it is meeting these duties.   
3.2 The Development Plan Scheme was considered under the Council’s Integrated
Appraisal Toolkit. No impacts on equality were identified and so a full Equality
Impact Assessment was not required. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its proposals. 
3.4 The matters presented in this report were considered under the 
Environmental Assessment (Scotland) Act 2005 and in relation to the Local 
Development Plan, referred to in the Development Plan Scheme, further action
is required. 
3.5 Due to the nature of the plan there are likely to be significant environmental 
effects, as a consequence, an environmental assessment of the Local 
Development Plan is compulsory under the Act. The local Development Plan 
is considered to be a ‘qualifying’ plan under the Act so it does not require 
screening. 
3.6 The next stage is to prepare a scoping report as part of the Local 
Development Plan process. This will determine the scope of the 
environmental assessment and will be submitted to the Consultation 
Authorities for comment. 
Sustainability 
3.7 Under the provisions of the Local Government in Scotland Act 2003 the Council
has to discharge its duties in a way which contributes to the achievement of
sustainable development.   Under the Climate Change (Scotland) Act 2009 the
Council also has a duty relating to climate change and, in exercising its functions
must act: 
Page 16 of 56

Page 17

• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.8 The Development Plan Scheme was considered under the Council’s Integrated
Appraisal Toolkit. The Development Plan Scheme is a vehicle for establishing
the LDP process and as such no impacts on sustainability will arise from the
Programme itself. 
Legal and Governance 
3.9 None. 
Risk 
3.10 None. 
4. Consultation 
Internal 
4.1 We have consulted with colleagues in Community Planning & Policy and the
Housing and Social Care Partnership in the development of the proposals and
they agreed that using the Place Standard tool to engage with communities on a
locality basis was appropriate. 
External 
4.2 None. 
5. Communication 
5.1 None. 
2. BACKGROUND PAPERS 
2.1 The following background papers were referred to during the preparation of this
report: 
Perth & Kinross Council Local Development Plan 2
Town and Country Planning (Scotland) Act 1997
The Town and Country Planning (Development Planning) (Scotland) Regulations
2023, Regulation 22 
Page 17 of 56

Page 18

Page 18 of 56

Page 19

rgr
PERTH & KINROSS
C O U N C IL
Perth and Kinross
DEVELOPMENT PLAN SCHEME
Draft programme for Local Development Plan 3: October 2024
5
Page 19 of 56

Page 20

Perth and Kinross draft DEVELOPMENT PLAN SCHEME October 2024 1
Development Plan Scheme
The Development Plan Scheme is a statement setting out Perth & Kinross Council’s timetable for the preparation of the next development plan.
Under statutory guidance, all planning authorities are required to publish annually a Development Plan Scheme. The Development Plan Scheme
will set out to include:
 an explanation of what the Local Development Plan is;
 a timetable for the preparation of the next plan, Local Development Plan 3;
 community engagement in the planning process and how relevant stakeholders, including residents of Perth and Kinross, can get involved.
OVERVIEW
Page 20 of 56

Page 21

Local Development Plan
The Scottish Government requires every planning authority to prepare development plans for their area. The Development Plan is at the
heart of the planning system setting out policies and proposals to guide the development, management and use of land. The Plan sets
out a vision and a framework for future development; addressing needs and opportunities in relation to housing, economy,
infrastructure, community facilities, safeguarding and enhancing environmental and landscape assets, the emerging needs of climate
change and achieving well designed places for the residents, communities and businesses of Perth and Kinross. To support the
preparation of the next Local Development Plan, there are a range of other plans and strategies that interlink with the LDP.
National Planning
Framework (NPF)
Community Plan &
Corporate Plan
Regional
Spatial
Strategy
Government
advice &
strategies
Local Housing Strategy Local Place Plans
The
Development Plan
National Planning Framework 4
Tayside Local Biodiversity
Action Plan
+
Local Development Plan
Strategies including
Forest & Woodland, Open
Space, Food Growing
Climate Change Strategy &
Action Plan
Mobility Strategy
Perth City Plan Planning Guidance
Perth and Kinross draft DEVELOPMENT PLAN SCHEME October 2024 2
Page 21 of 56

Page 22

National Planning
Framework 4 (NPF4) LDP3 Process
The Planning (Scotland) Act 2019 has introduced a
number of changes to the key steps for preparing a Local
Development Plan. Preparation of a new-style LDP will
include:
 Evidence gathering and early community and
stakeholder engagement leading to an Evidence Report.
 Submission of the Evidence Report to Scottish
Ministers for an independent Gate Check.
 Collaborative plan preparation, leading to publication of
the Proposed Plan for consultation.
 Submission of the Proposed Plan to Scottish Ministers
for an independent examination of outstanding issues.
 Adoption of the Local Development Plan
National Planning Framework 4 was adopted in February
2023 and forms part of the Development Plan. It covers
the period from its adoption to 2045 with 10 year reviews.
It is a long term strategy that plans for development and
investment in infrastructure; and identifies national
developments and other strategically important
opportunities in Scotland. The NPF contains both spatial
and thematic planning policies and sets out the national
policy position for land use planning. It will be used to
determine planning applications.
The New Plan: LDP3
Supporting assessmentsAlongside National Planning Framework 4, the Local
Development Plan (LDP3) will be the main document
which will influence future built development in Perth
and Kinross. As NPF4 contains planning policy, new
LDPs will be place-based documents with emphasis on
maps, site briefs and masterplans, with minimal policy
wording. The policies and proposals within the LDP are
to be focused on places and locations, while National
Planning Framework 4 will provide overarching thematic
policies for decision making.
There are several assessments that must be undertaken
to support the preparation of a new Local Development
Plan. They are an integral part of the plan-making
process and should inform, and be informed by, the plan
as it is being prepared. These include:
 Strategic Environmental Assessment (SEA)
 Public Sector Equality Duty Assessment
 Fairer Scotland Duty Assessment
 Habitats Regulations Appraisal
Perth and Kinross draft DEVELOPMENT PLAN SCHEME October 2024 3
Page 22 of 56

Page 23

LDP3 Timeline
The LDP3 Timeline opposite shows the timescales for each
stage of the plan making process. Key to note is the
extended timescale for preparation of the Evidence Report.
The previous Development Plan Scheme (November 2023)
anticipated that the Evidence Report would be published by
September 2024, however, it is now programmed for Q4
2025 (January - March).
This is in part due to the success of the early engagement
activities undertaken in the form of the Big Place
Conversation and consultation on policy themed Topic
Papers. These generated a significant level of responses,
necessitating a lengthier period than anticipated for
analysis, and inclusion where appropriate, within the
Evidence Report.
In addition, time has been added to review and learn from
recent decisions issued by the DPEA in relation to other
Planning Authorities’ Evidence Reports, and to pick up on
the matters raised and make sure points relevant to our
Evidence Report are addressed before submission.
Whilst the period for preparing the Evidence Report has
been extended by approximately six months, it then aims to
recover this time by shortening later stages of plan
production. This means that the intended adoption date for
the new Local Development Plan remains unchanged at
circa Q3 2027 (Oct-Dec 2027). The adoption date, whilst
not exact, remains likely to be late 2027.
Stage When
Evidence Report
Gather evidence 2022 – December 2024
Engage with public and groups on evidence  January 2023-December 2024
Finalise and Publish Evidence Report and SEA
Scoping Report
March 2025
Gatecheck
Examination of the Evidence Report April – June 2025* 
Proposed Plan
Call for Ideas and Sites April – May 2025
Prepare Proposed Plan, Delivery Programme April – December 2025
Prepare Equalities Impact Assessment, Public
Sector Equality Duty Assessment, Fairer Scotland
Duty Assessment and Habitat Regulations Appraisal
April – December 2025
Publish and consult on Proposed Plan and the SEA
Report
January – March 2026
Publish Equalities Impact Assessment, Public Sector
Equality Duty Assessment, Fairer Scotland Duty
Assessment and Habitat Regulations Appraisal
alongside Proposed Plan
January 2026
Assess representations. Consider any changes and
progress to examination stage.
April – December 2026**
Table continues on next page
Perth and Kinross draft DEVELOPMENT PLAN SCHEME October 2024 4
Page 23 of 56

Page 24

Perth and Kinross draft DEVELOPMENT PLAN SCHEME October 2024 5
Stage When
Examination
Examination of Proposed LDP3 January – June 2027**
Consider Examination
recommendations. Publish any
changes. Resend modified Proposed
LDP3 to Scottish Ministers
July – September 2027**
Amend SEA in light of Examination
recommendations, if necessary
July – September 2027**
Adoption
Publish and Publicise Adopted LDP3 October – December
2027
Publish SEA Post Adoption Statement Post December 2027
* This timescale is based on information from the Scottish
Government and will depend on the complexity of issues in
the Evidence Report. 
** This timescale for this stage will depend on the number
and complexity of representations received to the Proposed
Plan. 
A detailed timeline outlining the Local Development Plan’s
key stages and the types of engagement to take place is
provided in the draft Participation Statement.
All planning authorities have five years from the regulations coming
into force to replace their current Local Development Plan with a new
style Local Development Plan. This means the Council must prepare
and adopt LDP3 by no later than May 2028. 
Development Plan Schemes must specify the numbered Quarter (Q)
and the year in which the planning authority expects to publish
certain elements of the Local Development Plan process. This applies
to the following stages: 
Publish Evidence Report   Q4 2025 (January - March 2025)
Publish Proposed Plan  Q4 2026 (January - March 2026)
Send Proposed Plan to Scottish Ministers Q4 2027 (January - March 2027)
Adopt LDP3 Q3 2027 (October - Dec 2027)
Note: for the above, a Quarter refers to a three-month period of each
financial year which runs from April to March. 
Quarter 1 is April to the end of June; 
Quarter 2 is July to the end of September; 
Quarter 3 is October to the end of December; and 
Quarter 4 is January to end of March.
Page 24 of 56

Page 25

Perth and Kinross draft DEVELOPMENT PLAN SCHEME October 2024 6
Mediation
The Council will work with all stakeholders to discuss
any issues which could lead to potential
challenges/concerns throughout the plan
preparation process. One method that can be used
to support this is mediation, which can help aid
discussions.
The preparation of the Evidence Report may provide
the opportunity for concerns or disputes in the
evidence base to be discussed, to explore whether a
potential dispute may be resolved at this stage.
Mediation may be used in the latter stages of the
plan preparation when the Proposed Plan is
published and subject to further representations. 
The Council will be open to considering any requests
from stakeholders to use mediation, taking into
account the potential benefits in terms of saving
time and cost, and fostering better relationships
going forward. This could be on an informal basis or
through an independent third party
Local Place Plans
Local Place Plans (LPPs) offer communities the opportunity to produce a
plan for their area expressing their aspirations and ambitions for future
change. They focus on the community’s proposals for the development and
use of land and provide a new opportunity for communities to feed into the
planning system with ideas and proposals. 
LPPs may be registered and taken account of in LDP3. While the regulations
set out the legislative process, they leave scope for different approaches to
preparation and consultation of an LPP. For each LPP to be taken into
account in the LDP process, an LPP Expression of Interest may be submitted
at the start of its preparation, and those LPPs that are registered by 31
January 2025 will have most opportunity to be taken into account when
preparing the Local Development Plan.
Information and guidance have been published for community groups who
are interested in producing their own LPP and communities can seek
assistance from the Council and its partners. This process of support is
designed to be flexible to respond to issues as they arise. Further
information on LPPs can be found here:
Local Place Plans - Perth & Kinross Council (www.pkc.gov.uk/localplaceplans)
Page 25 of 56

Page 26

Participation Statement
The Planning (Scotland) Act 2019 places an increased emphasis on up-front engagement. This means that consultation needs to be comprehensive, co-
ordinated and collaborative.
The Participation Statement sets out our approach to consultation and engagement associated with the review of the Perth & Kinross Local Development Plan 3
(LDP3). Our consultation commitment is set out below.
Consultation Commitment Statement
The LDP3 engagement and evidence building process will be:
Perth and Kinross Local Development Plan review: draft participation statement October 2024 7
Relevant Discussions will be relevant to each group or stakeholder, including both settlement
development and policies and the methods that are used to carry out those discussions.
Inclusive To shape places that work for all we will proactively seek the views of all people, especially
those with specific needs and those whose views are seldom heard; identify and overcome
barriers to engagement and invest in the promotion of the benefits of engaging.
Informed Discussions will be informed by evidence already available including data gathering and
prior consultations to ensure contributions have a greater impact and are more efficient
Co-ordinated A joined up approach with the rest of Council and Council strategies, will deliver greater
efficiency, and help avoid consultation fatigue. Information fed back to other departments will
also help deliver their priorities
Collaborative Co-designing consultation and supporting community partners to carry out their own
engagement work will ensure the greatest reach and response working
Transparent Ongoing communication and feedback between the team and stakeholders, communities
and partners will support better outcomes and promote acceptance of outcomes.
Accessible Engagement events and materials for the general public must be accessible to all
wherever possible, and tailored arrangements made where this is not possible.
Page 26 of 56

Page 27

Participation Statement
Who will be consulted?
Everyone will have an opportunity to get involved and
comment throughout the LDP3 in the various stages of
plan preparation. Once the Proposed LDP3 has been
published there will be limited opportunity for further
engagement, so it is important to get involved during
the earlier stages of the process to ensure your voice is
heard. We will keep you updated on when events are
happening by publicising them on our website, through
Council social media accounts such as facebook, using
email updates and through the DPS Participation
Statement. Throughout the preparation of LDP3, our
approach to engagement and consultation will be based
on a collaborative approach, including (but not
exclusively) representatives of the following:
Community Planning Partners:
 Jobcentre Plus
 NHS Tayside
 Perth & Kinross Association of Voluntary Services (PKAVS)
 UHI Perth
 Police Scotland
 Scottish Enterprise
 Scottish Fire & Rescue Service
 Skills Development Scotland  Community Development Trusts
 Communities of Interest
 Landowners and Developers
 Businesses and business groups
 Locality Partnerships
 Tertiary students
 Older people
 Communities wishing to prepare Local Place Plans
Where not already specified, we will seek the views of
representatives of the following particular groups of
people:
 children and young people
 disabled people
 Gypsy/Travellers
 Community Councils
Key agencies:
 NatureScot
 SEPA
 Scottish Water
 Scottish Enterprise
 TACTRAN
 NHS Tayside
 Historic Environment Scotland
 Scottish Forestry
 Transport Scotland
Perth and Kinross Local Development Plan review: draft participation statement October 2024 8
Page 27 of 56

Page 28

Methods for Engagement
The experience of preparing previous LDPs has helped us learn how to improve the way we include the public and
reach a wide range of people. We are conscious that the pandemic and the cost-of-living crises have had an impact
on people, which is why we are proposing to have a mix of in person and digital platform consultation and
engagement events and meetings.
Proposed methods for information sharing, engagement and consultation for the preparation of LDP3 may include:
 Press releases;
 Social media alerts;
 Information and updates on Council webpage;
 Directly notifying people signed up to our updates mailing list. You can sign up here
developmentplan@pkc.gov.uk
 In person and online meetings and discussions;
 Drop-in sessions and engagement events using the Place Standard Tool in various locations across the council
area;
 Engaging with under-represented groups;
 Notifying neighbouring properties to sites that are being considered for inclusion within the plan;
 Council Consultation Hub – online questionnaires
Key Stages in the process for engaging
The following section outlines the key stages of preparation and the actions that have been/will be undertaken.
Perth and Kinross Local Development Plan review: draft participation statement October 2024 9
Page 28 of 56

Page 29

Prepare Evidence Report (commenced 2022 and ongoing through to late 2024)
Identification of groups and stakeholders to be proactively engaged Early 2022
Discussion with community partners and community councils on best consultation methods Early 2022
Co-ordination with other PKC departments on delivery of engagement, including those that
may not need targeting at this early stage due to recent or existing work
Mid 2022
Co-ordination with other PKC departments, community councils and community development
trusts to secure way forward for Local Place Plans
Late 2022
Launch of online area wide place feedback platform on consultation hub December 2022
Publicity and media support for upcoming engagement activities and throughout January-August 2023
Exploration of issues of importance with communities of place and community councils
through Place Standard; including tailored discussions reflecting both policies and place
such as affordable housing or natural space needs
January-August 2023
General opportunities for the public (including landowners and developers) for discussions on
policy and place such as the online place standard or surveys on consultation hub
January-August 2023
Local Place Plan invitation October 2023
Assisting Community Councils and community partners to support the delivery of inclusive
engagement to support LDP work and feeding into Local Place Plans
January 2023-October
2024
Targeted discussions online and in person around policy with specified communities of interest
or with specific (land use) need
January-December 2023
Sharing and co-ordination of information with other services and strategies including Perth
People Place and Mobility Strategy
Late 2023
Targeted discussions with communities of interest or need about the places they live to
support the wider public consultation
January-December 2023
Discussion with key agencies and PKC stakeholders on data gathered to date and future plans
that may affect policies or place including capacity of education, health, water etc.
Late 2023-December 2024
Evidence Report checked for compatibility with any Local Place Plans; and place-based evidence
shared with communities to inform LPPs Late 2023-December 2024
Perth and Kinross Local Development Plan review: draft participation statement October 2024 10
Page 29 of 56

Page 30

Collation and Submission of Evidence Report for Gate Check (April 2025)
Collation of information and analysis of data and consultation exercises to inform
identification of sites at the next stage
October 2023-December
2024
Collation, publication and submission of the Evidence Report February – March 2025
Perth and Kinross Local Development Plan review: draft participation statement October 2024 11
Page 30 of 56

Page 31

Collaborative Preparation of Proposed Plan (April 2025 to early 2026)
Following gatecheck of the Evidence Report, should any additional consultation be required
by the Reporter this will be carried out and the final Evidence Report resubmitted
April-June 2025
Issue Call for Sites and Ideas April-May 2025
Local policy options relevant to each group or stakeholder discussed to find a preferred way
forward or options
April-December 2025
Specific policy and place ideas, including those in Local Place Plans, explored with
communities and discussed with developer and landowner groups and contacts
April-December 2025
Place proposals analysed (draft SEA and HRA) and comments sought from specific groups
previously engaged with, community councils and public at large on preferred options
April-December 2025
Policy and site preferences discussed with key agencies and PKC stakeholders April-December 2025
All consultation and evidence analysed; outstanding issues discussed with stakeholders and
potential resolutions incorporated into the Proposed Plan Late 2025
Proposed Plan drafted and submitted to Council Early 2026
Perth and Kinross Local Development Plan review: draft participation statement October 2024 12
Page 31 of 56

Page 32

Perth and Kinross Local Development Plan review: draft participation statement October 2024 13
Proposed Plan Consultation (early to mid 2026)
Proposed Plan is published alongside HRA and SEA and general consultation January-March 2026
Public events to publicise the Proposed Plan and invite comments January-March 2026
Evidence is shared with communities preparing Local Place Plans Early 2026
Page 32 of 56

Page 33

Examination of Proposed Plan (late 2026 to early 2027)
Prepare examination papers April-December 2026
Proposed Plan with any modifications submitted to Scottish Ministers together with a Late 2026-Early 2027
summary of unresolved issues
Modify Proposed Plan (mid 2027)
Make requisite modifications to Proposed Plan on receipt of examination report July-September 2027
Adopt Local Development Plan (mid-late 2027)
Publish adopted Local Development Plan October-December 2027
Publish post-adoption statement Post-December 2027
Adopt and publish the Delivery Programme Post-December 2027
Perth and Kinross Local Development Plan review: draft participation statement October 2024 14
Page 33 of 56

Page 34

If you or someone you know would like a copy of this
document in another language or format, (on occasion,
only a summary of the document will be provided in
translation), this can be arranged by contacting the
Customer Service Centre on 01738 475000.
You can also send us a text message on 07824 498145.
All Council Services can offer a telephone translation
facility.
For key updates on the preparation of LDP3 please email
developmentplan@pkc.gov.uk
and ask to be added onto our database.
(PKC Design Team - 2020167)
www.pkc.gov.uk
Page 34 of 56

Page 35

APPENDIX 2 
CONSULTATION RESPONSE 
Local Development Plan Scheme Participation Statement
Consulted: 9 - 27 September 2023
Development Plans Team
Officer: Brenda Murray 
Received
From
Comment Summary PKC Officer Response Change Made
to DPS
Private
Individual
Request for Perth Community Flood Aid to be
included in the list of consultee organisations
in the Participation Statement. 
Perth Community Flood Aid along with a wide variety
of groups, fall into the category of “Communities of
interest” referred to in the Participation Statement.
The Group contact details have been added to our
LDP mailing list which is used to inform interested
parties about LDP updates, engagement events and
consultations. To reach a wider audience, the
Council website, digital channels and social media
will be used to promote opportunities and encourage
everyone to get involved.
No change to
Participation
Statement.
Private
Individual
Request for “Tenants” to be included in the list
of consultee organisations in the Participation
Statement. 
Tenants along with a wide variety of groups, fall into
the category of “Communities of interest” referred to
in the Participation Statement. The contact details for
Tenants and Residents Associations have been
added to our LDP mailing list which is used to inform
interested parties about LDP updates, engagement
events and consultations. In addition, to reach a
wider audience, the Council website, digital channels
and social media will be used to promote
opportunities and encourage everyone to get
involved. 
No change to
Participation
Statement.
5
Page 35 of 56

Page 36

Received
From
Comment Summary PKC Officer Response Change Made
to DPS
Private
Individual
Request for no more developments in
Auchterarder.
Comment refers to matters out with the content of
the Participation Statement which cannot be
addressed through this consultation.
No change to
Participation
Statement.
Private
Individual
Consultation with the community regarding
development plans is vital, but only if their
views can instigate change. Community views
expressed on planning application
23/01941/AMM, request for views to be taken
into account when making planning decisions.
The Participation Statement relates to the
engagement which will be undertaken in the
preparation of the next Local Development Plan i.e
LDP3 and all comments gathered will be given due
consideration when preparing that Plan. Community
views are an important part of the evidence that will
inform LDP3 alongside other considerations such as
housing need, environmental, social and economic
factors, and the policy framework set out at a
national level. The example highlighted relates to the
adopted LDP2 and a live planning application being
progressed through the development management
decision making process on which the Participation
statement has no bearing. 
No change to
Participation
Statement.
Network Rail Both the Development Plan Scheme and the
Draft Participation Statement are very helpful. 
Network Rail welcomes the opportunity to
engage with the council at all stages of LDP3
preparation and delivery, particularly during
the Evidence Report preparation currently
underway.
Network Rail is keen to discuss and contribute
to your evidence base in terms of rail
infrastructure. Namely, this would relate to
Comments and desire to be further engaged at all
stages of LDP preparation noted. 
No change to
Participation
Statement.
Page 36 of 56

Page 37

Received
From
Comment Summary PKC Officer Response Change Made
to DPS
network capacity and condition in relation to
your Spatial Strategy. 
Opportunities for the introduction or
improvement of Active Travel to/from stations
and the emerging Infrastructure Levy, and how
this would interface with emerging LDPs, are
also important topics Network Rail is keen to
discuss further. 
Scott Hobbs
Planning
Site suggestion for inclusion within LDP3 Comment refers to matters out with the content of
the Participation Statement and are more applicable
and relevant to the proposed plan stage of the LDP
process. Advised respondent to submit suggestion at
“Call for Ideas and Sites” stage of Plan preparation.
No change to
Participation
Statement.
Private
Individual
View’s given on future development in the
village of Crook of Devon. 
Comment refers to matters out with the content of
the Participation Statement and are more applicable
and relevant to the proposed plan stage of the LDP
process. Advised respondent to submit ideas at “Call
for Ideas and Sites” stage of Plan preparation.
No change to
Participation
Statement.
Private
Individual
The Statement is very clear and
comprehensive. 
Supportive comments. No change to
the
Participation
Statement.
Private
Individual
The Participation Statement looks good and
the commitment to an inclusive approach and
providing ‘everyone’ with an opportunity to
have their say is encouraging. 
Supportive comments. No change to
the
Participation
Statement.
Page 37 of 56

Page 38

Received
From
Comment Summary PKC Officer Response Change Made
to DPS
Homes for
Scotland
Given the importance of home building across
all tenures to the social and economic
success of Perth & Kinross, it is vital that a
home builder representative is defined as
such. We would also like to see a reference in
the Participation Statement to what other local
authorities have termed “expert groups”. These
will be stakeholders with key expert knowledge
in an industry. HFS can act as this stakeholder
for the home building industry. It is positive
that the Evidence Report Preparation stage of
the Development Plan Scheme (DPS) sets out
that the Council will seek views on the
gathered data from key agencies. HFS request
to be engaged in both contributing information
to the Evidence Report, and the review of this
evidence base. 
During the Evidence Report stage, we would
like to see more information on how the
engagement of key stakeholders will take
place, and who the Council considers would
have a key role in the meeting of the legislative
requirements of the Evidence Report.  HFS
should be identified as a key agency.   
It is recognised that HFS represents a large part of the
Home Building industry and that it is an important
contributor to the preparation of LDP3, along with
numerous other representative organisations. The
Participation Statement states that “Throughout the
preparation of LDP3, our approach to engagement
and consultation will be based on a collaborative
approach, including (but not exclusively)
representatives of … Landowners and Developers”.
HFS falls within this category and have been invited
to engage in the Topic Paper consultation both in
terms of suggesting additional evidence and in
reviewing the proposed evidence base. HFS has
submitted comments and these are being given due
consideration in preparing the Evidence Report. 
The Participation Statement sets out information on
how the engagement of all stakeholders will take
place on pages 9 to 13 of the DPS and is considered
to contain sufficient information in this regard. There
is no statutory requirement for the Participation
Statement to set out who the Council considers
would have a role to play in meeting the legislative
requirements of the Evidence Report. The Council
would refer the respondent to Regulation 25 of The
Town and Country Planning (Development Planning)
No change to
Participation
Statement. 
No change to
Participation
Statement 
Page 38 of 56

Page 39

Received
From
Comment Summary PKC Officer Response Change Made
to DPS 
HFS is keen to build on the engagement we’ve
had with Perth & Kinross Council. This should
continue to take the form of, ideally, in-person
meetings between HFS and its members and
the ability for two-way communication
between us and the council in the form of
phone calls and emails, as appropriate. 
It is positive that during the Proposed Plan
Preparation period a ‘Call for Sites and Ideas’
survey will be issued. 
The Local development planning guidance
(2023) states that the DPS must include
proposed timings for various stages of LDP
plan preparation, by specifying the proposed
year and quarter. However, we note that the
DPS draft document does not appear to
contain this information. 
Establishing a coherent Site Assessment
Methodology will require significant continued
engagement with HFS and our members. 
(Scotland) Regulations 2023, which sets out the
bodies specified as key agencies. 
Agreed 
Support for Call for sites stage noted 
Consultation was on the Participation section of the
DPS only. This information is included within the full
document. 
The views of the respondent are noted. However, the
site assessment methodology is not for the
Development Plan Scheme and Participation
Statement to address and is part of the Evidence
Report and the Gatecheck processes. 
No change to
Participation
Statement 
No change to
Participation
Statement 
No change to
Participation
Statement 
Page 39 of 56

Page 40

Received
From
Comment Summary PKC Officer Response Change Made
to DPS
To adapt the Housing Need and Demand
Assessment (HNDA) figure into a Local
Housing Land Requirement (LHLR) figure will
also require significant ongoing engagement
with HFS and our membership. There must be
open and transparent dialogue on setting the
LHLR including which other factors should be
considered in order that the LHLR exceeds the
MATHLR as required by NPF4. 
The current HNDA process and toolkit are
fundamentally flawed and significantly
underestimate the true need and demand for
housing. 
The comments of the respondent are noted; however,
the purpose of the Development Plan Scheme and
Participation Statement is to set out the timeframe
for production of the next Local Development Plan,
the stages involved in that, and how people can be
involved in the LDP preparation. The Council has
been engaging with the development industry
(including house builders and infrastructure
providers) during preparation of the Evidence Report
to ensure the evidence base we have is as robust as
possible. 
However, there is no requirement to detail every
process involved in gathering information for housing
in the Development Plan Scheme and Participation
Statement document, these will be discussed when
and if necessary, with relevant parties.
No change to
Participation
Statement 
Cardross
Asset
Management
Ltd
There needs to be recognition that pivotal Gate
Check Reports for LDP3 require an integrated
approach from stakeholders. For example,
Strategic Flood Risk Assessments are required
for the PKC area. These will involve PKC, SEPA,
Scottish Water and affected landowners so
there must be a prescriptive and inclusive
approach. This is of critical importance for
Inveralmond Industrial Estate (including LDP
development site E38), where PKC is required
to advance flood protection measures. 
The Strategic Flood Risk Assessments (SFRA)
purpose is to inform the development planning
process, and gather evidence, primarily to avoid
increasing overall flood risk, and avoid development
within NPF4 ‘at risk’ areas. The draft SFRA was
consulted on as part of the Flood Risk and Water
Environment Topic Paper which ran 8 Jul till 18 Aug
2024. This draft was prepared by the planning
authority in consultation with Scottish Environment
Protection Agency (SEPA). The SFRA guidance
prepared by SEPA suggests, ’input from colleagues
with expertise in flooding, planning, mapping,
building standards and from other organisations such
No change to
Participation
Statement 
Page 40 of 56

Page 41

Received
From
Comment Summary PKC Officer Response Change Made
to DPS 
Utility capacity constraints require an
integrated approach from SSE, SGN, Scottish
Water, and Scot Gov, as consented BESS
developments are removing kVA capacity for
allocated LDP infrastructure sites. 
It is noted with concern that PKC appears to be
using the 2022 Ryden Report re demand &
supply analysis for Classes 4, 5 & 6. This report
is nearly 2 years out of date and must be
updated.  
There must be up to date and robust
assessment of "effectiveness" of existing LDP
sites. For example, Perth West requires
delivery of a substantial road junction, and
there is no certainty that this junction can be
provided via City Deal.  
There appears to be an inference that for
Classes 4, 5 & 6 development that LDP3 site
allocation should broadly reflect the
as Scottish Water and Scottish Canals may be
needed prior to finalising it.’ There is no particular
benefit or need to involve landowners when preparing
the SFRA, however, it will be important to engage with
landowners and developers, at Call for Sites and
Ideas stage. 
The remaining comments of the respondent are
noted, however, they refer to matters out with the
Participation Scheme. They relate to the content of
the topic papers and will be considered in the
preparation of the Evidence Report. The purpose of
the Development Plan Scheme and Participation
Statement is to set out the timeframe for production
of the next Local Development Plan, the stages
involved in that, and how people can be involved in
the LDP preparation. 
No change to
Participation
Statement
Page 41 of 56

Page 42

Received
From
Comment Summary PKC Officer Response Change Made
to DPS
settlement hierarchy within PKC, and further
that "mixed use" development should be
encouraged. This is in our view completely
flawed, as particularly major Class 6
developments are likely to have 24/7
operations so require some separation from
existing residential conurbations. So
substantial Class 6 development at strategic
transport junctions but in smaller settlements
should also be supported within LDP 3.
Fossoway
Community
Council
Request that local primary and high schools in
the Fossoway area are included in the LDP
preparation process. 
Request for Fossoway Community
Development Trust to be included in future
emails. 
The Participation Statement states that we will seek
the views of children and young people. Initial
engagement has been undertaken across the 5 to 25
year age group through involvement of schools and
various youth organisations. Place Standard events
were held in both Fossoway Primary School and
Kinross High School to gather pupils views about
what they like in their area and what could be
improved. We will continue to keep the schools
informed and engaged during the various stages of
plan preparation. 
Fossoway Community Development Trust have been
added to the LDP mailing list. 
Page 42 of 56

Page 43

PERTH AND KINROSS COUNCIL 
Economy & Infrastructure Committee 
21 October 2024 
PERTH AND KINROSS OUTDOOR ACCESS FORUM 
ANNUAL REPORT 2023-24 
Report by Strategic Lead – Housing & Communities
(Report No. 24/285) 
1. PURPOSE 
1.1 This report summarises the activities and progress of the Perth and Kinross
Outdoor Access Forum over the last year and recommends the appointment
of one new member to the Forum. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee:
  
• confirms the appointment of one new member for a period of four years 
• notes that the remaining members are retained in their appointments for
at least a further year as set out in Appendix 1 
• delegates to the Strategic Lead (Housing & Communities) the fulfilment
of any casual vacancy arising in this period through recruitment by
Forum members, as detailed within the Forum’s Terms of Reference 
• notes the contribution of two retiring members - thanking them for their
service, the activities and progress of the Forum since November 2023,
and the ongoing commitment to maximise effective partnership working
to make the best of the exceptional landscapes, paths networks and
access rights for all within Perth & Kinross. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background  
• Section 5: Proposals 
• Section 6: Conclusion  
• Appendices 
4. BACKGROUND / MAIN ISSUES  
4.1 This report follows on from the previous report (Report No. 23/293 refers) to
the Environment, Infrastructure and Economic Development Committee on 1
November 2023. 
4.2 Part 1 of the Land Reform (Scotland) Act 2003 requires local authorities to set
up at least one local Access Forum and to appoint members to it. The Act
6
Page 43 of 56

Page 44

states that the functions of a Forum are to advise the local authority and any
other person or body consulting the forum on matters having to do with: 
• the exercise of access rights 
• the existence and delineation of rights of way 
• the drawing up and adoption of a plan for a system of core paths
• the offer of assistance in disputes about access rights etc. 
4.3 The Perth and Kinross Outdoor Access Forum (the Forum) was established in
2004 and their statutory role is as advisors to the Council and others on public
access matters. Whilst the main service contact is with Community
Greenspace, the Forum are able to work directly with other services covering
legal, planning and infrastructure projects, on matters relevant to them.  As
such, occasionally there can be issues the Council may not be able to agree
with the Forum on, or fully meet their expectations.  Key topics the Forum
have been advising the Council on over the last year include developments at
Taymouth Castle, Gleneagles West, Bertha Park, Murrayshall Golf Driving
Range, Blairgowrie West and the Cross Tay Link Road.     
4.4 The Forum has capacity for sixteen members. Twelve members are voluntary
and represent the interests of landowners/managers, the community and
recreation equally. These members are elected at an open Forum meeting
and their appointments confirmed by the Economy & Infrastructure
Committee. The remaining members represent agencies and other bodies
and are invited onto the Forum by the Council. The list of members and the
prospective member is shown in Appendix 1. 
4.5 Four ordinary meetings took place over the last year including the Annual
General Meeting (AGM) and open meeting on 16 May 2024 at the North Inch
Community Campus and online. In each group category, members stood
down to vacate seats for the election but were re-elected to their positions.
This is subject to the approval of the Environment, Infrastructure and
Economic Development Committee: 
• In the Recreation Group, Anne Macintyre stood down and Colin Young
was elected in her place.
• No changes were made in the Communities Group, 
• No changes were made in the Land Manager’s Group, 
• In the Agencies and Other Bodies Group, Keith Robertson stood
down. 
4.6 Anne Macintyre has served on the Forum since 2019. Anne’s local knowledge
of Kinross-shire, practical experience with the Portmoak Paths Group and
contribution to the work of the Forestry Sub-Group was particularly valuable. 
4.7 Keith Robertson was nominated by the Centre for Inclusive Living and served
on the Forum since 2021. He brought a wealth of experience from the
voluntary sector, expertise on equalities, and also contributed to the work of
the obstructions and the forestry sub-groups. 
Page 44 of 56

Page 45

4.8 As it stands, the Forum is carrying a vacancy for a land manager and two
vacancies for the Agencies and Other Bodies Group. Officers are working with
the Forum to identify suitable replacements.  The Forum will fill any casual
vacancies which may arise as per their Terms of Reference 
4.9 The Forum has a long established ‘Exemptions and Obstructions’ subgroup
which met on four occasions to assist officers in Community Greenspace to
prioritise and try to resolve 140 obstructions to public access in that period. 
They have also been involved in developing the prioritisation criteria and
reviewing the process used for dealing with obstructions. In 2021 the Forum
also established a subgroup to respond to consultations on forestry proposals.
New forestry, associated deer fencing and timber operations can have
significant impacts on public access. During 2023-24 the Forum responded to
several such consultations and engaged positively both with the forestry
companies and Scottish Forestry to achieve better outcomes. 
4.10  In July 2024, the Scottish Government wrote to Perth & Kinross Council,
directing the Council to review the Core Paths Plan in relation to private level
crossings. The implications of this are currently being assessed and the
Forum have been made aware of the letter as they may wish to be involved in
the review, and because they would be a consultee on any consequential
changes which might be made. 
4.11 Since 2016, administrative support for the Forum was withdrawn by Corporate
Services to meet savings targets then.  Whilst the Community Greenspace
Service has also seen significant savings and a restructuring over previous
years, officers have done their best to cover areas such as provision of
meeting venues, administrative support for those meetings, mileage and out
of pocket expenses such as printing.  With further reductions to Community
Greenspace budgets over the last two years, this is significantly impacting on
the time available for staff to focus on access issues, including upholding
access rights, supporting 18 volunteer paths groups, taking forward key
access projects and taking forward the Core Paths Plan review.   
4.12 This is of increasing concern to the Forum and they are suggesting a budget
of several thousands of pounds is required for them to cover mileage
expenses and any administrative support the Council is unable to provide.
There is no specific budget currently set for this so limited and reducing
administrative support is provided by greenspace staff and expenses, where
requested, are funded through the recently reduced Community Greenspace
budget for supporting volunteers. Coincidentally, a national review of the role
of Local Access Forums (LAFs) in the form of a draft Guide to Good Practice,
is currently underway through NatureScot.  Initial observations would be that
the activities being suggested for LAFs will require substantially more
resources to support them than are currently available. 
In the meantime, discussions will continue to be held with the Forum to try and
agree a protocol on how to best to use Council officer and Forum volunteer
time within the limited resources available.   
Page 45 of 56

Page 46

5. PROPOSALS 
5.1  It is proposed that the appointment noted above and detailed Appendix 1 is
confirmed and that any casual vacancy arising is filled by the Forum as
detailed in its Terms of Reference. 
5.2 It is also proposed to continue to seek ways to work with the Forum to
maximise the effective use of our collective resources.  This will include
responding to the NatureScot draft Guide to Good Practice. 
6. CONCLUSION   
6.1 The Council’s Community Greenspace service manages the statutory
functions in relation to the Land Reform (Scotland) Act 2003 and values the
partnership relationship with the Forum and the advice it has to offer. There is
a wide range of activities undertaken in relation to the management of core
paths and access rights more generally. Opportunities to involve the Forum in
these, with their agreement, will continue to be sought.  This will help to make
the best of the exceptional landscapes, paths networks and access rights for
all within Perth & Kinross. 
Authors
Name  Designation Contact Details
Dave Stubbs 
Andy Clegg
Greenspace
Coordinator –
Communities 
Community
Greenspace Manager 
(01738) 475000
EPLCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Elaine Ritchie  Strategic Lead (Housing &
Communities)
7 October 2024 
APPENDICES 
Appendix 1 – Candidate for Appointment to the Forum 
Page 46 of 56

Page 47

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION  
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  No
Workforce No
Asset Management (land, property, IST) No
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  No
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications 
Community Plan/Single Outcome Agreement 
1.1 This report supports one of the priorities within the Community Plan 2022-27. 
(ii)  Mental and physical wellbeing 
Corporate Plan    
1.2 This report supports the objectives within the Corporate Plan 2022/23 to
2027/28:- 
(ii)  People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities 
for all;  
(iii)  People can achieve their best physical and mental health and have
access to quality care and support when they need it;  
(iv) Communities are resilient and physically, digital and socially connected;  
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations. 
Page 47 of 56

Page 48

2. Resource Implications 
Financial 
2.1 There are no resource implications arising directly from the recommendations
in this report. However, the level of financial support for Forum activities will
reduce in line with budget savings. 
Workforce 
2.2 The reduction in staff capacity will mean less support for the Forum and
outdoor access activities more generally. 
Asset Management (land, property, IT) 
2.3 There are no direct asset management issues with this report although the
Forum is a key organisation in assisting the Council with the management of
Core Paths and Rights of Way networks. 
2.4 There are no information technology implications arising from this report. 
3. Assessments 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. The proposals have been considered under the
Corporate Equalities Impact Assessment process (EqIA) with the following
outcome: 
(i) Assessed as not relevant for the purposes of EqIA
Strategic Environmental Assessment 
3.2 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. The proposals have been considered under the Act and no further
action is required as it does not qualify as a PPS as defined by the Act and is
therefore exempt. 
Sustainability 
3.3 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. 
Under the Climate Change (Scotland) Act 2009 the Council also has a duty
relating to climate change and, in exercising its functions must act: 
Page 48 of 56

Page 49

• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.4 There are no direct impacts on sustainable development as a result of these
proposals but securing the public access to the great outdoors contributes to
the economic, social and environmental well-being of the area. 
Legal and Governance 
3.5 There are no legal implications from this report. 
Risk 
3.6 The reduction in resources available to support the Forum present a risk to
the level of advice they may be able to provide.  It is also becoming
increasingly difficult for the Forum to recruit and retain volunteers. 
4. Consultation 
Internal 
4.1 The Strategic Lead for Legal and Governance has been consulted on the
content of this report. 
External 
4.2 The Perth and Kinross Outdoor Access Forum has been consulted on the
proposals and in the preparation of the report. 
5. Communication 
5.1 There are established regular meetings and communications between the
Council and Perth and Kinross Outdoor Access Forum. 
2. BACKGROUND PAPERS 
2.1 No background papers have been relied on in preparing the report, other than
those committee reports already referenced within the main body of the
report.
Page 49 of 56

Page 50

Page 50 of 56

Page 51

APPENDIX 1
CANDIDATE FOR APPOINTMENT TO THE FORUM 
Member elected on 16 May 2024 and recommended for immediate appointment. 
Recreation Group 
Name Organisation/ Interest Geographical
knowledge/ 
home area 
Notes/ profession
Colin Young
Elected 2024
(subject to
confirmation by
this committee) 
Dunning Community Council
and Dunning Community Trust
Perth and Strathearn Broad outdoor and community
interests. 
6
Page 51 of 56

Page 52

The following tables list current members who will continue in their roles on the Forum and are not up for re-appointment
this year 
Recreation Group
Name Organisation/ Interest Geographical
knowledge/ 
home area 
Notes/ profession
Mary Conacher
Member since 2004
Re-elected 2022 
Scottish Canoe Association
(SCA), Women’s Rural Institute,
Royal Tay Yacht Club 
Highland/Alyth Former SCA Access
volunteer/retired watersports
instructor
Karen Inkster
Member since 2017
Re-elected 2021 
British Horse Society, Scottish
Rights of Way and Access
Society (Scotways) 
Perth Area 20 + years in the outdoor industry. 
Hillwalker, climber, horse rider and
mountain biker.
John Andrews
Member since 2009
Re-elected 2021 
Ramblers, Scotways, Scottish
Wildlife Trust, Luncarty
Redgorton & Moneydie
Community Council, National
Trust for Scotland
Perth Area/Luncarty Former member of County Access
Liaison Committee – retired.
Page 52 of 56

Page 53

Community Group
Name Organisation/ Interest Geographical
Knowledge/ home area
Notes/Profession
Nick Cole
Member since 2004
Re-elected 2021
Strathmore and the Glens Rural
Partnership. Meigle Community
Trust.  Next Steps & Stride for
Life Walking Groups. 
Highland & Lowlands/
Meigle
Electronic Systems Engineer is
now a private consultant & runs an
outdoor training business. Involved
in local groups inc. Blairgowrie &
Rattray Access Network & the
Blairgowrie & District Next Steps
walking group.  He also represents
Local Access Forums on the
National Access Forum.
Jennifer Herd
Member since 2015
Re-elected 2023
Member of British Horse
Society, Strathearn Rural +
Riders Access Group
Highland and East
Perthshire. Perth area
Broad experience particularly in
negotiating equestrian access and
representing the interests of horse
riders. She is also a keen mountain
biker and walker.
Joyce Carnegie
Elected 2022
Comrie Millennium Footpath
Association 
Strathearn Wide range of community interests
inc SWI. Farming background.
Sarah Walker
Co-opted 2021 
Kinglands Hall, Soroptimist
International, Cornhill
MacMillan, British Horse
Society & ByCycle
Perth area 25 years local knowledge through
work with a variety of voluntary
organisations. 
Page 53 of 56

Page 54

Landowner/Manager Group
Name Organisation/ Interest Geographical
Knowledge/ home area
Notes/Profession
Councillor Hugh
Anderson
Member since 2004
Re-elected 2022 
Scottish Rights of Way &
Access Society. 
Perth & Surrounding
area/Scone
Land & River Management. Retired 
Estate Factor. Newly elected
Councillor (2022) 
Sandy Simpson
Member since 2005
Re-elected 2023 
Royal Highland Educational
Trust, Rural Services Scotland, 
Perth and Kinross Agricultural
Forum
Perth Area Farm Manager 
Interested in all environmental
issues.
Mark Thomson
Elected 2022 
National Farmer’s Union,
Scotland
(former chair West Fife &
Kinross)
Kinross Farmer
Woodland, arable & livestock
Vacant 
Page 54 of 56

Page 55

Agencies & Other Bodies 
These members are not elected but have been invited to sit on the Forum by the Council. Officers will work with the
Forum to identify suitable candidates to fill the two remaining places.
Member Represents Job Title Office Base/other interests
Councillor John Duff
Appointed 2022 
Perth & Kinross Council  Councillor Ward 4
Highland 
Ward Councillor.  Leader of the
opposition. Retired Police
Superintendent. 
Mike Strachan
Member since 2007
Scottish Forestry Operations
Manager 
Scottish Forestry, Upper Battleby.
Extensive forestry experience and
involvement in Big Tree Country
Vacant 
Vacant 
Page 55 of 56

Page 56

Page 56 of 56