APPENDIX 2 
Cycling, Walking and Safer Routes (CWSR) Projects 2024/25 
Shared Use Paths / Community Schemes / Safer Routes to Schools
1 Perth City  CWSR £10,000  
Provision of minor measures such as dropped kerbs and tactile paving to
improve the city centre for pedestrians with visual and mobility impairment. 
Wards 10, 11, 12.
See Plan No 1 
2 Town Centre, Auchterarder  CWSR £10,000  
Provision of minor measures such as dropped kerbs and tactile paving to
improve the town centre for pedestrians with visual and mobility impairment. 
Ward 6.
See Plan No 2
3 Town Centre, Blairgowrie/Rattray CWSR £10,000 
Provision of minor measures such as dropped kerbs and tactile paving to
improve the town centre for pedestrians with visual and mobility impairment. 
Ward 3.
See Plan No 3
4 Town Centre, Dunkeld  CWSR £10,000
Provision of minor measures such as dropped kerbs and tactile paving to
improve the town centre for pedestrians with visual and mobility impairment. 
Ward 5. 
See Plan No 4 
5 Town Centre, Scone CWSR £20,000 
Provision of minor measures such as dropped kerbs and tactile paving to
improve the town centre for pedestrians with visual and mobility impairment. 
Ward 2. 
See Plan No 5
6 Town Centre, Kinross CWSR £10,000 
Provision of minor measures such as dropped kerbs and tactile paving to
improve the town centre for pedestrians with visual and mobility impairment. 
Ward 8. 
See Plan No 6

Page 2

Shared Use Paths/Community Links or Safer Routes to Schools continued 
7 Scone Airport Link Path  CWSR £500,000 
Construction of Shared-use path linking Scone to Scone Airport and
existing bus shelter. Signalisation of the Scone Airport junction to improve
crossing facilities.
Ward 2 
8 Wardside, Muthill Footway  CWSR £50,000 
Construction of footway along Wardside to improve access to Muthill
Primary School. 
Ward 7
9 A912 Baiglie Straight  CWSR £30,000    
Contribution towards the provision of shared use path for cyclists and
pedestrians between A912 Baiglie Straight and Aberargie. Project being
carried out in partnership with P&K Countryside Trust. 
Ward 9. 
See Plan No 8  10 Grandtully Primary School  CWSR £50,000   
Provision of 2.5m wide shared use path through park to connect main 
road to Primary school. 
Ward 4. 
See Plan No 9    
11 Castlebrae, Huntingtower, Perth  CWSR £50,000 
Provision of footway link and other minor measures to connect A85 to
Ruthvenfield Primary school. 
Ward 9. 
See Plan No 10

Page 3

Shared Use Paths/Community Links or Safer Routes to Schools continued 
12 Forgandenny Footway Phase 2 CWSR £50,000 
Provision of footway link to connect Primary school from Forgan Grove to
eastern edge of village. 
Ward 9. 
See Plan No 12
13 Kinross Sustainable Transport Hub   CWSR £100,000 
Provision of sustainable transport hub linking secure cycle parking with public
transport facilities.
Ward 8. 
See Plan No 13  
14 Sauchie Road Crieff  CWSR £15,000
Provision of footway link from Sauchie Road to Ryan Place to improve
pedestrian links.
Ward 6. 
See Plan No 14  
Engineering Administration £117,000
TOTALS 
CWSR (Eng. Admin.) £117,000
CWSR (Works) £865,000