Appendix 2 - Active Travel Projects 2024-25
Perth and Kinross Council · 29 May 2024
Back to Economy and Infrastructure Committee — 29 May 2024 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
APPENDIX 2 Cycling, Walking and Safer Routes (CWSR) Projects 2024/25 Shared Use Paths / Community Schemes / Safer Routes to Schools 1 Perth City CWSR £10,000 Provision of minor measures such as dropped kerbs and tactile paving to improve the city centre for pedestrians with visual and mobility impairment. Wards 10, 11, 12. See Plan No 1 2 Town Centre, Auchterarder CWSR £10,000 Provision of minor measures such as dropped kerbs and tactile paving to improve the town centre for pedestrians with visual and mobility impairment. Ward 6. See Plan No 2 3 Town Centre, Blairgowrie/Rattray CWSR £10,000 Provision of minor measures such as dropped kerbs and tactile paving to improve the town centre for pedestrians with visual and mobility impairment. Ward 3. See Plan No 3 4 Town Centre, Dunkeld CWSR £10,000 Provision of minor measures such as dropped kerbs and tactile paving to improve the town centre for pedestrians with visual and mobility impairment. Ward 5. See Plan No 4 5 Town Centre, Scone CWSR £20,000 Provision of minor measures such as dropped kerbs and tactile paving to improve the town centre for pedestrians with visual and mobility impairment. Ward 2. See Plan No 5 6 Town Centre, Kinross CWSR £10,000 Provision of minor measures such as dropped kerbs and tactile paving to improve the town centre for pedestrians with visual and mobility impairment. Ward 8. See Plan No 6
Page 2
Shared Use Paths/Community Links or Safer Routes to Schools continued 7 Scone Airport Link Path CWSR £500,000 Construction of Shared-use path linking Scone to Scone Airport and existing bus shelter. Signalisation of the Scone Airport junction to improve crossing facilities. Ward 2 8 Wardside, Muthill Footway CWSR £50,000 Construction of footway along Wardside to improve access to Muthill Primary School. Ward 7 9 A912 Baiglie Straight CWSR £30,000 Contribution towards the provision of shared use path for cyclists and pedestrians between A912 Baiglie Straight and Aberargie. Project being carried out in partnership with P&K Countryside Trust. Ward 9. See Plan No 8 10 Grandtully Primary School CWSR £50,000 Provision of 2.5m wide shared use path through park to connect main road to Primary school. Ward 4. See Plan No 9 11 Castlebrae, Huntingtower, Perth CWSR £50,000 Provision of footway link and other minor measures to connect A85 to Ruthvenfield Primary school. Ward 9. See Plan No 10
Page 3
Shared Use Paths/Community Links or Safer Routes to Schools continued 12 Forgandenny Footway Phase 2 CWSR £50,000 Provision of footway link to connect Primary school from Forgan Grove to eastern edge of village. Ward 9. See Plan No 12 13 Kinross Sustainable Transport Hub CWSR £100,000 Provision of sustainable transport hub linking secure cycle parking with public transport facilities. Ward 8. See Plan No 13 14 Sauchie Road Crieff CWSR £15,000 Provision of footway link from Sauchie Road to Ryan Place to improve pedestrian links. Ward 6. See Plan No 14 Engineering Administration £117,000 TOTALS CWSR (Eng. Admin.) £117,000 CWSR (Works) £865,000