Planning
Enforcement
Charter
Revised May 2024
Appendix 1

Page 2

You can report a suspected breach of planning control using our online
Breach of Planning Control Report Form or by submitting an email to
us:
Foreword
Development within Perth and Kinross contributes towards the Council’s
objectives and priorities for the area, as expressed through our
Corporate Plan 2018-2022. 2022/23-2027/28. Planning Enforcement
plays an important role to uphold this contribution and to maintain public
confidence in the planning system, by ensuring that the intended
benefits of development are realised and our natural and built
assets are protected.
This Charter sets out Perth & Kinross Council’s approach, as Planning
Authority, to planning enforcement; which places the public and all
stakeholders in the planning system at the core of what we do. We
therefore set out what we can and cannot do, explain the processes
involved and make a commitment on the level of service we aim to
provide. We value public input in this process and, as such, we
endeavour to make the reporting of possible breaches of, and
engagement within the planning system, by the public accessible to all.
Email PlanningEnforcement@pkc.gov.uk 
Report a breach online
If you are unsure about whether the development or work carried out is a
breach of planning control, you can check what does and does not need
permission on these webpages:
www.pkc.gov.uk/article/15035/Planning-Enforcement 
www.pkc.gov.uk/article/14991/What-needs-planning-
permission- 
You can check to see if a development has a valid planning permission or
other required consents by using our Online Planning System.
2 Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021

Page 3

Investigating Possible Breaches of Planning Control 10
Registration of Your Observation 10
Initial Investigations 10
Contents
The Planning Enforcement Service 4
Our Approach to Planning Enforcement 5
Priorities for Planning Enforcement 6
Stages of the Enforcement Process 6
Reporting a Breach of Planning Control 7
Breaches of Planning Control 7
Resolving Cases 11
Acting on Breaches of Planning Control 12
Informal Action and Discretion 12
Formal Action 12
Other Enforcement Controls 8
Listed Buildings and Conservation Areas 8
Advertisements 8
Trees 8
Trees - Other Controls 8
High Hedges 9
Matters That Cannot Be Considered by the 9
Enforcement Officers
Non-Planning Matters 9
Appeals 13
Further Information 13
Enforcement Register 13
Time Limits for Enforcement 13
Customer Care and Complaints Process 14
Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021 3

Page 4

This Charter explains the role of the Council and how enforcement
process works and sets out:
• the Council’s role and policy on taking Planning Enforcement Action,
including our priorities and the service standards you as a customer
(both those who report breaches or who are being investigated) can
expect;
• how customers can bring any breach of planning control to the
attention of the Council;
• explains what happens at each stage of what can sometimes be a
lengthy process; and
• how any complaint about the Council taking enforcement action can be
submitted and how it will be dealt with.
The Planning Enforcement Service
Planning permission is required for most forms of development unless it
is classed as ‘permitted development’. When development or work is
undertaken without permission, or not in accordance with an approved
permission or consent, discretionary powers are available to the Council
to investigate and take enforcement action, when it is in the public
interest to do so. It is for the Council to decide whether to take
enforcement action, based on the significance of the breach and
any impacts or planning harm.
It is the role of the Planning Enforcement team to carry out these duties. A
comprehensive guide to Planning Enforcement can be found in the
Scottish Government’s Circular 10/2009.
This Charter outlines how the planning enforcement system operates
and what can be expected of the service provided by the Council.
Planning Enforcement Charters are a statutory requirement for
Planning Authorities to regularly maintain and review when needed,
but to at least review every two years.
We continually monitor the implementation of the Charter to ensure that
standards are being met and priorities are being addressed. As part of
this review process, we publish an Annual Planning Enforcement
Report on our performance. This Charter reflects this review
process since our last charter was published in January 2021.
4 Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021

Page 5

Our Planning Enforcement team undertake focused monitoring,
particularly of major or significant developments to ensure compliance
with conditions and legal agreements associated with planning
permissions. 
When a monitoring record is opened, or when a justified complaint about
a breach of planning control is received these will appear online on our
PublicAccess system. This allows the public and interested parties to
review basic information and any significant updates. However, the
online case will never disclose who the complainant is. 
Ultimately, we seek to ensure that effective action is taken against breaches of
planning control, particularly where these have significant adverse impacts on
the environment or on communities. We also seek to update relevant parties
in a timeous manner. Accordingly, we set out our Priorities for Planning
Enforcement overleaf.
Our Approach to Planning Enforcement
Perth & Kinross Council’s approach to planning enforcement is not to
punish but to come to a conclusion on how to progress, wherever possible
using negotiation in the first instance. If it is considered that the issue must
be addressed, planning permission is required, and that it is not
proportionate to advise the property owner that they should seek that
permission or they do not exercise the right to make an application, then
formal action may be taken.. As a discretionary power, however, the
Council needs to consider in each case if enforcement action is justified
and whether or not to take action. It is important to clarify that the Council is
not required to take any particular action and may decide, in some cases,
that not acting is justified and proportionate. The Council will however make
decisions which: 
• Accord with the Council’s corporate priorities;
• Reflect Development Plan policy objectives;
• Reflect Scottish Government guidance; and,
• Recognise the Cost of Living Crisis. 
We will produce a Closing Report at the end of investigations explaining our
decision reasoning.
Scottish Government guidance on the use of enforcement powers is
provided in Circular 10/2009 ‘Planning Enforcement’. This guidance
explains, among other matters, that Council’s should not take
enforcement action just to address a breach of planning control, if the
development is otherwise acceptable in planning terms and taking a
sensitive to the impact of enforcement action on small businesses. The
primary aim for seeking retrospective planning consent is normally to
secure ongoing controls through the imposition of planning conditions.
Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021 5

Page 6

Stages of the Enforcement ProcessPriorities for Planning Enforcement
Whilst we will consider all observations of suspected breaches of
planning control, including non-compliance with planning conditions
and obligations, our priority will be to direct resources to significant or
harmful matters including:
Significant detrimental impacts on matters of environmental importance,
especially on sensitive or protected environments.
Breach Reported
• Provide as much information
and details as possible.
• Describe the harm/impacts.
• Provide your contact details.
Matters of pedestrian and traffic safety.
Significant detrimental impacts on residential amenity.
Significant detrimental effects on public visual amenity.
Significant breaches of condition or the terms of a legal agreement in respect of a
major development or development where there is a significant level of
community interest.
Investigation
• Is it a planning matter?
• Is it a breach?
• Information gathering.
• Negotiation and resolution.
Action and Outcomes - We decide whether to act
Damage or Works to Listed Buildings and works which adversely affect their
character. Formal
Action
Informal
Action
No Further
ActionBreaches of planning control within designated Conservation Areas, particularly
where improvement schemes have been promoted by the Council.
Unauthorised felling of or works adversely affecting all trees protected by
(Tree Preservation Orders, Conservation Areas and where planning
conditions apply).
Negotiation to
remedy the breach
or reduce the harm.
If no breach, minor
breach or a lack of
harm.
Breaches of planning control which undermine a Council priority,
policy or programme.
Serving a Notice
resulting in removal
of unauthorised
development.
Seek penalties
fines or prosecution.
Invite retrospective
planning application
Planning permission
may be approved.
Based on the principles within the Scottish Government’s Circular 10/2009 and
the Council’s wider policies, we will act sensitively and proportionately
when taking enforcement action if that action would affect the economic
wellbeing of a business.
6 Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021

Page 7

Reporting a Breach of Planning Control
When a breach of planning control is received or identified, there
are two decisions for the Planning Enforcement team:
• whether a breach of planning control has taken place; and
• if a breach has occurred, whether it is expedient to take any
enforcement action.
As advised previously, the decision of whether to act is at the discretion
of the Council and is a matter of judgement, having regard to planning
facts and circumstances of the case. Any action taken must be in the
wider context and be proportionate to the impact.
If you believe work or development being carried out is a breach of
planning control, you can submit this to us through our interactive Breach
of Planning Control Report Form. Alternatively, you can contact our
Customer Service Centre : 01738 475000 or email XXXXXXXX. All
reports are handled confidentially.
When reporting a breach, you should:
• provide your contact details (preferably an email address);
• provide or describe the address/location;
• explain the nature and extent of the development/works;
• state when the development/work started or was completed;
• detail the owner and/or who might be undertaking the works;
• list any relevant planning permissions;
• provide photographs of the development/works; and
• provide any other information you consider relevant (such as
dimensions, hours of any activities, online information like business
websites etc).
Breaches of Planning Control
Planning breaches include:
• work being carried out which requires planning permission or a related
consent;
• an unauthorised change of use;
• failure to comply with conditions attached to a permission or consent;
and
• departures from drawings or documents approved as part of a
planning permission or other consent.
We do undertake proactive monitoring of approved developments;
however, it is not possible, to monitor every development.
Consequently, the public play an extremely important role in alerting the
Council to, and providing information on, any possible breaches, whether or
not that development has planning permission.
Possible or known breaches are often identified by the public when
purchasing a property, through the conveyancing process, via Property
Enquiry Certificates which provide information on any planning notices
that affect the property or land. The sales process is often a good
opportunity to remedy existing breaches between the seller, buyer and
the Council. Unresolved breaches of planning control can hinder or stop
the sale, so the Council encourages all property owners to remedy
breaches, even where it has decided that PKC will not take formal
enforcement action.
You can check to see what needs planning permission on our
website. You can also see if the developer already has planning
permission and/or other consents in place, as
well as any conditions that are
attached to these, by using
our Online Planning System.
Report a breach online
Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021 7

Page 8

Trees
Under S171 of the Town and Country Planning (Scotland)
Act 1997, it is an offence to carry out works to trees
subject to statutory protection that results in their uprooting,
felling, lopping or wilful destruction, without the prior consent
of the planning authority.
Formal action can be taken against persons who have
carried out unauthorised works to trees covered by a Tree
Preservation Order (TPO) or a tree(s) being within a
Conservation Area. Where protected trees have been
removed or destroyed this can see a Tree Replacement
Notice served requiring new tree planting. In certain cases,
offences reported to the Procurator Fiscal and, if successful,
can result in fines up to £20,000.
Trees - Other Controls
In addition to planning controls, you may need a Felling
Permission from Scottish Forestry. Further guidance on this
process, and details of works exempt from needing approval,
can be found at:
https://forestry.gov.scot/support-regulations/ felling-
permissions
Other Enforcement Controls
Other planning enforcement related matters can be reported to us,
through our Breach of Planning Control Report Form, so we can investigate
whether a breach or offence has taken place. These include:
Listed Buildings and Conservation Areas
The enforcement rules that apply to Listed Buildings,
demolitions and works in a Conservation Areas are set
out in the Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 and associated regulations.
Unauthorised works can lead to a Listed Building
Enforcement Notice being served and such unauthorised work can
constitute a criminal offence, which could result in a £50,000
fine and/or a custodial sentence of up to 6 months.
Advertisements
Different procedures again apply when compared to
development. Adverts are regulated through the Town and
Country Planning (Control of Advertisements) (Scotland)
Regulations 1984. These controls relate to the form and
siting of adverts only and we have the ability to serve 
Advertisement Enforcement Notices. The actual content of
an advertisement is not covered by planning control and
any complaints about this should be made to:
The Advertising Standards Authority
Mid City Place
71 High Holborn
LONDON
WC1V 6QT
or by visiting www.asa.org.uk 
8 Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021

Page 9

Matters That Cannot Be Considered by the
Enforcement Team
Non-Planning Matters
Where an enquiry relates to non-planning matters, these cannot be
investigated or addressed through Planning Enforcement. Issues
which must be addressed by the individuals involved include neighbour
disputes or civil issues such as:
High Hedges
The Council’s enforcement powers include the ability to
serve a High Hedge Notice under the High Hedges
(Scotland) Act 2013. This allows a resident whose amenity
is severely affected by a high hedge to formally apply
to the Council to have a notice served on the ‘hedge’ owner
to remove or reduce the adverse impact of the high hedge.
The owner has the right to appeal any Notice, as does the
applicant where a notice is not served. Non-compliance with
a Notice can see PKC undertake works directly.
Further information on our approach and remit for High
Hedges can be found on our website.
NOTE: High Hedges applications will be determined in
accordance with their own statutory process and
timescales, and, as such the Service Standards set out
within this Charter do not apply.
• the ownership of land: if someone has undertaken development
on your land, we can only consider the requirement of planning
permission and need for enforcement action. If formal action is to
be taken, the planning authority is required to serve an enforcement
notice on the owner of the land (i.e. yourself), as well as other
interested parties. For this reason, you should seek your own legal
advice on how best to address the issue; or
• connection to utility services: when applying for planning
permission, developers are required to confirm to the
planning authority what water or sewerage connections are
required for the proposed development. However, provision of these
services is a civil matter and/or a matter for any statutory undertaker
to approve any such connections and investigate any associated
iconserns. If your enquiry relates to another function of the Council, we will direct
this to the appropriate department. If unauthorised works or development
are being undertaken on a council owned property, you should report
these works to the relevant department such as housing, education or
estates in the first instance.
Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021 9

Page 10

Initial Investigations
Following registration, an Enforcement Officer may visit the site to
investigate. The timescales for this will depend on factors such as
the type and significance of the issue. The Council has legal powers
to enter land or property in order to identify if a breach of planning control
has taken place. The same powers are available throughout the process
for the purposes of investigation or assessing compliance with any
enforcement notices served (see ‘Resolving Cases’ overleaf).
Investigating Possible Breaches of Planning
Control
The Council will always treat information about the identity of people who
report breaches to us in confidence and will only disclose it when
required to do so by law.
We do encourage you to provide your name and contact details, as we
may require further information from you as the investigation
progresses or to understand the impacts of the breach and how it
affects you. This also allows us to keep you informed of
progress and the outcome of our investigations.
Where an anonymous observation is received, we reserve the right to
choose not to investigate. Where it relates to one of our priority areas,
or it is judged to be in the public interest, we are more likely to
investigate breaches that have been reported anonymously.
Service Standard - 2
Where a site visit is required we will undertake this within 15 working days
from registration of a case, unless further actions are required (see below).
Registration of Your Observation
When we receive an observation, we first check that it includes all the
information we need for an enforcement case to be investigated. Where an
enquiry relates to non-planning matters, such as neighbour disputes or other
civil issues, these cannot be investigated by the Council. If your enquiry relates
to another function of the Council, we will direct this to the appropriate
department. Upon a justified complaint being received, a case will be opened
and published on our PublicAccess system. 
In some cases, we may require further information from you about the
suspected breach, such as photographs or evidence of development or
activity, before or instead of visiting the site. Additional investigation at
this stage may also be required for some cases to establish if a breach
has occurred, such as utilising our legal powers to seek information
from the developer(s) about the use of land and/or parties that have an
interest in the land. This can include us serving a Planning
Contravention Notice (PCN). The serving of notices for this purpose
may lengthen the process and, if this is required, this will be explained
to you where possible.
Service Standard - 1
After preliminary checks, we will register your enforcement observation
and you will receive either an email or written confirmation of this
within 5 working days from receipt. This acknowledgement will, if
justified and considered a breach of control, include the reference
number for the case as well as the contact details of the
investigating Enforcement Officer.
10 Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021

Page 11

Service Standard - 4
Where works or development has been carried out without planning
permission, but we consider that the development is likely to be
acceptable in terms of Development Plan policy, we may invite an
application or we may serve a notice under Section 33A of the Planning
Act that requires the developer to submit a planning application
retrospectively.
Service Standard - 3
You will receive a follow-up response to your observation within 20
working days of receipt. This will advise of any provisional findings
and, where relevant, detail the proposed course of action for the case,
which could mean formal enforcement action being taken. Communication
will also be made at this stage with the Developer on our findings
and possible action.
You may also be advised at this stage if the observation does not
constitute a breach of planning control or is not a planning matter -
either of which will result in your case being closed. We will set out in
writing our reasoning for all cases closed in a Closing Report.
Where we previously advised that a conclusion to a case has not been
reached, we will keep you informed of the progress with the case or notify
you its conclusion. If at any point we decide that further action is not
justified, we will inform you of this and the reasons for that decision.
In some cases, it may be inappropriate to regularly provide an update on
the progress of enforcement action, particularly when the matter proves
difficult to resolve quickly. You will be advised accordingly in such
circumstances.
Resolving Cases
Where a breach of planning control is identified and we provide an
undertaking to resolve it to address significant planning harm,
through informal or formal means, we will do this as quickly as possible. It
is advised, however, that progress on the case can be delayed for several
reasons; such as the collection and verification of information which
could be over a period of time, so negotiations could take place or where
formal procedures are organised.
The resolution to a breach may be through a planning application or
other consents (such as Listed Building Consent) being submitted to
regularise the breach. Where the development is likely to be
acceptable, the Council may seek the submission of an application in
retrospect as a valid means of assessing the development and
possibly addressing the breach. A formal decision will be made
through the planning application process. You will, however, have the
right to make representation on the application, which is separate to
any breach reported. The application process will increase the
timescales for the enforcement case.
Service Standard - 5
We will either conclude the case within, or provide an update to you, within
40 working days from receipt of your observation.
When an enforcement case is being closed, a Closing Report will be
prepared which will explain why we have come to a decision.
This report will be made publicly available.
Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021 11

Page 12

Acting on Breaches of Planning Control
Informal Action and Discretion
It should be noted that, even though planning controls have not been
followed, in some cases formal action may not be appropriate.
Furthermore, most breaches of planning control are resolved informally.
The Council is obliged to use its discretion when considering action and
be proportionate with formal powers. Each case must be considered on
its own merits and the best solution in the circumstances must be
decided. Only a relatively small number of cases require formal
enforcement action, where we will serve a notice.
Formal Action
If we are unable to resolve a breach through informal measures, or
through a planning application, where justified we may take formal
enforcement action and serve a notice. This will normally be either
an Enforcement Notice or a Breach of Condition Notice. In some cases,
a Stop Notice or a Temporary Stop Notice may be appropriate. Notices
will clearly explain what is required, the timescales involved and the
available options to resolve the issue. Any notices served will be
available for viewing online on our PublicAccess system.
It should also be noted that an enforcement notice will be legally associated
with the building or land to which it relates until its provisions have been
fully discharged. This will be highlighted in any Property Enquiry
Certificate issued when a property is being sold.
The type of notices we can serve and when they can be served is fully
explained in the Scottish Government’s Circular 10/2009. In summary, the
Council’s powers include the ability to issue a Temporary Stop Notice to
stop development. These Notices are valid for up to 28 days and are
effective from the time they are served, without requiring that an
Enforcement Notice be served first. This allows the Council 28
days to consider the situation before a formal Enforcement Notice and Stop
Notice, if necessary, require to be served.
In most cases where a breach merits formal action, an Enforcement
Notice, or other such as a Listed Building Enforcement Notice,
Breach of Condition Notice or Amenity Notice is served on those
involved in the development or who own or have an interest in the
property. These notices include the following information:
• A description of the breach of control that has taken place.
• The steps that should be taken to remedy the breach.
• The timescale for taking these steps.
• The consequences of failure to comply with the notice.
• Where appropriate, any rights of appeal the recipient has and how to
lodge an appeal.
An Enforcement Notice can be accompanied by a Stop Notice if it is
considered justified to prevent, for example, further work being carried out
which is likely to have a significant detrimental impact on matters such as
environmental quality.
Where a Notice is not complied with, there may be further consequences and
the Council will usually take further formal steps, which can
include:
• the issue of a fixed penalty notice;
• seeking interdicts or referral of the case to the Procurator Fiscal for
prosecution; or
• direct action by the Council, to undertake the remedies specified in a
notice, which will include seeking recovery of our costs.
In taking such action, the Council will consider the most effective
means of ensuring compliance with the notice(s). The authority to
proceed with taking formal action or legal proceedings has been
delegated to the Head of Planning & Development.
12 Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021

Page 13

Service Standard - 6
We will, where it is considered expedient to do so, aim to serve any
enforcement notice within 3 months from the date of the original
observation and we will advise you when this is done.
Further Information
Enforcement Register
We maintain an Enforcement Register, which details all notices served by
the Council. A list of recent Enforcement Notices is available on our
website.
Appeals
Where a notice is served the Developer can, in most cases, submit an
appeal to the Scottish Ministers. Most enforcement appeals are
delegated to Reporters within the Scottish Government’s Planning and
Environmental Appeals Division (DPEA) to determine. If this happens
timescales will be affected. The Council will defend notices served
and you will also have the opportunity to make representation to the
Scottish Ministers during the appeal process.
Alternatively it can be inspected in person, during normal office hours, by
visiting:
Perth & Kinross Council
Pullar House
35 Kinnoull Street
PERTH
PH1 5GD
Time Limits for Enforcement
Service Standard - 7
Where an appeal is submitted against a notice we will advise you of
this and inform you on how you can monitor progress. Following an
appeal decision, we will advise of any further action we will take, as
appropriate.
Planning Enforcement action must be taken within strict time limits:
• A four-year limit applies to unauthorised operational development (the
carrying out of building, engineering, mining or other
operations in, on, over or under land) and change of use to a single
dwellinghouse.
• A ten-year limit applies to all other development including change of use
(other than to a single dwellinghouse) and breaches of condition.
There is no time limit restricting the commencement of Listed Building
Enforcement Action or action concerning a Tree Preservation Order.
Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021 13

Page 14

Lastly, if you are dissatisfied with the Council’s response to your
complaint or the way it has been handled, you can ask the Scottish Public
Services Ombudsman (SPSO) to look at it. The contact details for the
SPSO are:
SPSO
FREEPOST EH641
EDINBURGH
EH3 0BR
Customer Care and Complaints Process
The Perth & Kinross Council’s Customer Service Standards explain the
level of service you can expect when contacting Planning Enforcement in
writing, by telephone or in person. We are committed to providing high-
quality customer care and we welcome suggestions on how we can
improve our service.
We will respond within 15 working days of receiving a suggestion about our
Planning Enforcement service. We will consider all suggestions made and
use them to review and improve the service we provide. We will
communicate with you on any changes we implement as a result.
Any formal complaint will be dealt with in accordance with the Council’s
Complaints Handling Procedure. We will always tell you who is dealing with
your complaint and how it will be handled and what timescales apply. Our
complaints process has two steps:
• Stage One: Frontline Resolution - we will give you our decision within 5
working days or less.
If you are not satisfied with the response at Stage One, it will progress
Tel 0800 377 7330
Website/Online Contact www.spso.org.uk/contact-us 
to:
Stage Two: Investigation - we will acknowledge your complaint within
3 working days and provide you a full response within 20 working
days.
14 Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021

Page 15

Our Contact Details:
Planning Enforcement
Communities
Perth & Kinross Council
Pullar House
35 Kinnoull Street
PERTH
PH1 5GD
Tel 01738 475300
Email PlanningEnforcement@pkc.gov.uk 
Website www.pkc.gov.uk/article/15035/Planning-enforcement 
How We Use Your Personal Information
The information provided by you will be used by Perth &
Kinross Council to enable us to investigate the complaint
or observation that you have made. The information
may be shared with other services within the Council if
considered necessary. The information will not be
disclosed to third parties.
The Council may check information provided by you,
or information about you provided by a third party,
with other information held by us. We may also get
information from certain third parties or share your
information with them in order to verify its accuracy,
prevent or detect crime, protect public funds or
where required by law.
For further information, please look at our website
www.pkc.gov.uk/dataprotection or email
DataProtection@pkc.gov.uk or telephone 01738 477933.
If you or someone you know would like a copy of this 
document in another language or format, (on occasion, 
only a summary of the document will be provided in 
translation), this can be arranged by contacting the
Customer Service Centre on 01738 475000.
You can also send us a text message on 07824 498145.
All Council Services can offer a telephone translation facility.
www.pkc.gov.uk 
Perth & Kinross Council Ɩ Planning Enforcement Charter Ɩ 2021 15

Page 16

(PKC 2020284)