Page 1

Securing the future…  Improving services
 Enhancing quality of life  Making the best use of
public resources
Council Building
2 High Street
Perth
PH1 5PH
14/08/2024
A hybrid meeting of the Climate Change and Sustainability Committee will be
held in the Council Chamber on Wednesday, 21 August 2024 at 09:30.
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk.
THOMAS GLEN
Chief Executive
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode.
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting.
Members:
Councillor Richard Watters  (Convener)
Councillor Liz Barrett  (Vice-Convener)
Councillor Hugh Anderson
Councillor Dave Cuthbert
Councillor Angus Forbes
Councillor David Illingworth
Councillor Noah Khogali
Councillor Grant Laing
Depute Provost Andrew Parrott
Councillor Grant Stewart
Councillor Jack Welch
Page 1 of 62

Page 2

Page 2 of 62

Page 3

Climate Change and Sustainability Committee
Wednesday, 21 August 2024
AGENDA
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT.
1 WELCOME AND APOLOGIES
2 DECLARATIONS OF INTEREST
3 MINUTE OF MEETING OF CLIMATE CHANGE AND
SUSTAINABILITY COMMITTEE OF  1 MAY 2024 FOR
APPROVAL
(copy herewith)
5 - 6
4 OUTSTANDING BUSINESS STATEMENT (OBS)
(copy herewith 24/215)
7 - 8
5 NATURE RESTORATION FUND 2024-2025
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 24/216)
9 - 24
6 YEAR ROUND WEATHER EVENT RESPONSE
Report by Strategic Lead - Environment and Infrastructure (copy
herewith 24/217)
25 - 62
Page 3 of 62

Page 4

Page 4 of 62

Page 5

CLIMATE CHANGE AND SUSTAINABILITY COMMITTEE 
Minute of hybrid meeting of the Climate Change and Sustainability Committee held
in the Council Chambers on 1 May 2024 at 9.30am. 
Present: Councillors R Watters, L Barrett, H Anderson, D Cuthbert, A Forbes,
K Harvey (substituting for Councillor J Welch), D Illingworth, N Khogali, G Laing,
A Parrott and G Stewart; Mr R Oram and Mr M Mathers. 
In Attendance: F Crofts, Strategic Lead – Environment and Infrastructure;
A Williams, Director – Economy, Place and Learning; B Wilson, N Moran,
E Williamson, V Milford, L Cassidy (up to and including Item 4) and P Garden (up to
and including Item 4) (all Communities); S Hendry, A Taylor, M Pasternak, and
S Dockerill (all Corporate and Democratic Services). 
Apologies: Councillor J Welch. 
Councillor R Watters, Convener, Presiding. 
1. WELCOME AND APOLOGIES 
Councillor Watters welcomed everyone to the meeting and an apology for
absence was noted as above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF MEETING OF CLIMATE CHANGE AND SUSTAINABILITY
COMMITTEE OF 14 FEBRUARY 2024 
The minute of meeting of Climate Change and Sustainability Committee of
14 February 2024 was submitted and approved as correct record. 
4. ‘GROW WILD FOR PERTH AND KINROSS’ 
L Cassidy, Community Greenspace referenced the recently issued Elected
Member Briefing Note (033-24 ‘Grow Wild for Perth and Kinross’) and provided a
detailed verbal update on the extension of the previous grassland management trials
policy previously approved at this Committee on 31 May 2023. 
L Cassidy answered Members’ questions thereon. 
5. CONSULTATION ON DRAFT MOBILITY STRATEGY 
There was submitted a report by Strategic Lead – Economy, Development
and Planning (24/144) seeking approval for the Consultation Draft Mobility Strategy
and associated Draft Action Plan. 
3
Page 5 of 62

Page 6

Resolved:
The Draft Mobility Strategy as detailed in Appendix 1 and associated draft
Action Plan as detailed in Appendix 2 of Report 24/144, be approved for public
consultation. 
Page 6 of 62

Page 7

CLIMATE CHANGE AND SUSTAINABILITY COMMITTEE 
OUTSTANDING BUSINESS STATEMENT (OBS) 
(Report No. 24/215) 
Please note that this statement sets out outstanding decisions of this committee along with an update and estimated completion date.  Actions
which are overdue are shaded for ease of reference.  Where an update reflects that an action is complete then the Committee’s agreement will be
sought to its removal from the OBS. 
No  Minute
Reference
Subject Title Outstanding Action Update  Lead Officer
/Service
Action Due /
Complete
Action
Expected
5. 1 May 2024
Item 5
Consultation
Draft Mobility
Strategy
With reference to Page
11 of Appendix 1 –
Consultation Draft
Mobility Strategy,
specifically (6. Active
Travel) – provide
clarification on the
accuracy of the figure
£7.8m as the total
annual economic benefit
from all trips cycled in
Perth.
Update provided by
Elliot Williamson, Lead
Officer – Mobility
Strategy to Councillor
Forbes subsequently
forwarded to all other
Members for
information on 7 May
2024. 
Ben Wilson /
Elliot Williamson
COMPLETE 21 August
2024
4
Page 7 of 62

Page 8

Page 8 of 62

Page 9

PERTH AND KINROSS COUNCIL
Climate Change & Sustainability Commitee
21 August 2024
NATURE RESTORATION FUND 2024-2025
Report by Strategic Lead – Environment and Infrastructure
(Report No. 24/216)
1. PURPOSE
1.1 This report provides an update on the allocation of the Nature Restoration
Fund (NRF) received by Perth and Kinross Council for 2023/24 and outlines
the proposed approach for utilising the funds for 2024/25. It seeks approval
for delegating authority to the Strategic Lead for Environment and
Infrastructure to approve projects recommended by the NRF working group.
2. RECOMMENDATIONS
2.1 It is recommended that the Committee:
 note the NRF 2023-24 report
 approve the delegation of authority to the Strategic Lead for Environment
and Infrastructure to approve projects recommended by the NRF
working group based on set scoring criteria for best value nature
restoration across Perth and Kinross.
3. STRUCTURE OF REPORT
3.1 This report is structured over the following sections:
 Section 4: Background
 Section 5: Proposals
 Section 6: Conclusion
 Appendix
4. BACKGROUND – 2023/24 ALLOCATION
4.1 The Nature Restoration Fund (NRF) is a 5-year initiative to support projects
that restore nature and improve biodiversity. It includes capital grants for local
authorities, known as the “Edinburgh Process” strand. Announced in the
2021/2022 Scottish Government budget, it initially provided £5 million to local
authorities.
In 2023-2024, the funding doubled to £10 million, with £5 million for
biodiversity projects and £5 million specifically for creating Nature Networks.
Perth & Kinross Council received £353,000 for 2023-2024, with at least half of
this funding to be allocated to Nature Network projects.
5
Page 9 of 62

Page 10

4.2 In 2023-2024, a total of twenty-three applications were received and
evaluated by the NRF internal working group, with sixteen projects awarded
funding. The funded projects involved investment in machinery, invasive
species control, riparian habitat restoration, green corridor creation, wildflower
meadow establishment, pond restoration and creation, and biodiversity
enhancement in greenspaces. One project by Milnathort Primary School has
been deferred to 2024-2025 (an amount of £12,500 included in “Community
projects” below).
The final budget allocation was: 
 Council projects £181,000
 Community projects £166,000
 Underspend budget of £6,000
The 2023-2024 NRF detailed project report is attached as Appendix 1 and will
be uploaded to the Council’s website.
4.3 The NRF is directly supporting the Council’s Corporate Plan priorities of
tackling Climate Change and supporting sustainable places focusing on
adaptation and addressing biodiversity emergency.
5. PROPOSALS
5.1 In mid July, Perth and Kinross Council received £175,000 of NRF funding for
2024/25. Criteria for projects follows previous funding rounds, with priority
given to those addressing nature networks. The fund opened to applications
on 19th July, and will close 18th August.
5.2 Due to the seasonal nature of many biodiversity projects, to avoid delays and
maximise the ability to deliver, the Committee is asked to approve in
retrospect the approach to fund allocation and delegate permission to the
Strategic Lead for Environment and Infrastructure to finalise the methodology
and award funding.
5.3 As with last year's process, all applications will be scored via a scoring matrix
and evaluated by the NRF working group. The highest-scoring projects will be
recommended for approval. Key points of the proposed process are:
 The NRF coordinator will assess all applications and provide
comments for the working group.
 The working group will review all applications and recommend the
highest-scoring projects for approval.
 Consideration of project types and geographic distribution will be
ensured.
 Once recommendations have been approved by the Strategic Lead for
Environment and Infrastructure, funding will be made available to
successful applicants.
5.4 The process ensures that the projects that are best value for nature
restoration will be taken forward. With the delivery of funding to Community
Page 10 of 62

Page 11

Greenspace, other internal departments, community organisations, and local
landowners, the NRF is helping to deliver on obligations in accordance with
the Biodiversity Duty under the Nature Conservation (Scotland) Act 2004; and
empower communities to undertake projects that will make a significant
difference in areas that are of value to them. Approval of applications under
delegated authority will allow for timely allocation to projects to ensure work
can progress without delay.
6. CONCLUSION 
6.1 The successful delivery of the 2023-24 NRF has enhanced biodiversity and
created nature networks across Perth and Kinross. With the short timescale
between receiving confirmation of fund amount, launch and closure of the
fund, the proposed methodology ensures timely and effective project
implementation. Delegating authority to the Strategic Lead for Environment
and Infrastructure will facilitate this process.
Author
Name Designation Contact Details
Hannah Wilson Climate Change Land
Restoration Officer
(01738) 475000
ComCommitteeReports@pkc.gov.uk
Approved
Name Designation Date
Fraser Crofts Strategic Lead - Environment
and Infrastructure
12 August 2024
APPENDICES
 Appendix 1 – Nature Restoration Fund 2023-2024 Report
Page 11 of 62

Page 12

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION
Strategic & Resource Implications Yes / None
Community Plan / Single Outcome Agreement Yes
Corporate Plan Yes
Financial Yes
Workforce None
Asset Management (land, property, IST) None
Assessments
Climate Change Assessment Yes
Strategic Environmental Assessment None
Sustainable Procurement & Supply Assessment Yes
Equality & Fairness Assessment None
Child Rights & Wellbeing Assessment Yes
Consultation
Internal Yes
External None
Communication
Communications Plan Yes
1. Strategic Implications
Community Plan/Single Outcome Agreement
1.1 This report supports all of the priorities within the Community Plan 2022-27:
(i) Mental and physical wellbeing
(ii) Skills, learning and development
(iii) Employability
Corporate Plan
1.2 This report supports the objectives within the new Corporate Plan: -
(i) Children and young people grow up safe, respected, well-educated and 
confident in their ability to realise their full potential
(ii) People and businesses are increasingly able to prosper in a local economy
which supports low carbon ambitions and offers opportunities for all
(iii) People can achieve their best physical and mental health and have
access to quality care and support when they need it
(iv) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations
Page 12 of 62

Page 13

2. Resource Implications
Financial
2.1 This proposal was considered to be financially beneficial as the Nature
Restoration Fund grant will allow the Council and community groups to
undertake transformational nature restoration projects, financed by
NatureScot. £175k NRF grant funding has been received for financial year
2024/25.
Workforce
2.2 None.
Asset Management (land, property, IT)
2.3 None.
3. Assessments
Climate Change Assessment
3.1 Under the Climate Change (Scotland) Act 2009 and the Climate Change
(Emissions Reduction Targets) (Scotland) Act 2019, the Council has a duty to
contribute to reducing Scotland's greenhouse gas emissions in line with
national targets, help deliver Scotland's climate change adaptation
programme and act to promote sustainable development. To comply with this
duty, it is essential that climate change be considered at the heart of all
Council processes and decisions using climate change impact screening.
3.2 This proposal was considered to have a positive impact on how Land Use and
Land Use Change processes respond to climate change. For example,
promoting more sustainable management and maintenance regimes for
greenspace (reduced herbicide use, increased grassland, reduced cutting).
The proposal was also considered to have a positive impact on reducing
emissions through carbon capture. The proposal also considered a positive
Climate Resilience & Engagement Impact in ensuring biodiversity,
ecosystems and landscapes are protected from and adaptable to the
changing climate.
Strategic Environmental Assessment
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals.
3.4 The proposals have been considered under the Act and no further action is
required as it does not qualify as a PPS as defined by the Act and is therefore
exempt.
Page 13 of 62

Page 14

Sustainable Procurement & Supply Assessment
3.5 Under the Procurement Reform (Scotland) Act 2014, the Council has a duty
to consider sustainable procurement as part of it's procurement process. The
Council is required to consider how in conducting the procurement process it
can - (i) improve the economic, social, and environmental wellbeing of the
authority's area, (ii) facilitate the involvement of small and medium
enterprises, third sector bodies and supported businesses in the process, and
(iii) promote innovation.
3.6 This proposal was considered under the Council’s Impact and Value
Assessment. Impacts on sustainable procurement and supply were identified.
Environmental projects will create employment opportunities in land
management, benefiting local economies. The fund will prioritise the
procurement of goods and materials from sustainable sources that do not
harm vulnerable ecosystems.
Equality & Fairness Assessment
3.7 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Under Part 1 of the Act ‘The Fairer Scotland Duty’,
the Council is required to actively consider how it can reduce inequalities of
outcome caused by socioeconomic disadvantage, when making strategic
decisions. 
3.8 This proposal was considered under the Council’s Impact and Value
Assessment. No impacts on equality were identified and the document was
assessed as not relevant for the purposes of EFIA.
Child Rights & Wellbeing Assessment 
3.9 The United Nations Convention on the Rights of the Child (UNCRC) was
ratified by the UK Government in 1991. It sets out the civil, political, economic,
social and cultural rights that all children, everywhere, are entitled to and is
regarded as the global “gold standard” for children’s rights.Screening for Child
Rights and Wellbeing Impacts, alongside the Getting it Right for Every Child
(GIRFEC) wellbeing indicators ensures that Council policies protect and
promote the rights and wellbeing of children and young people. 
3.10 This proposal was considered under the Council’s Impact and Value
Assessment. Positive impacts on Child Rights and Wellbeing were identified.
Projects involving schools in environmental education and hands-on learning
experiences support children's educational achievements by integrating
practical skills and knowledge about biodiversity and sustainability. Projects
that involve children and young people in planning and decision-making
processes ensure their voices are heard and respected, fostering a sense of
inclusion and empowerment.
Page 14 of 62

Page 15

4. Consultation
Internal
4.1 This report has been informed by discussions with members of Planning &
Housing Strategy, Climate Change & Sustainable Development, Community
Greenspace, and Tayside Biodiversity Partnership.
External
4.2 N/A.
5. Communication
5.1 A webpage has been set up on the Council website at
www.pkc.gov.uk/naturefund. Social media has been used by the Council and
Tayside Biodiversity Partnership to promote the success of the previous
year’s fund. These channels will be used again to invite applications for the
current year. Further ongoing communications will inform the public of key
stages of the fund as well as progress of projects.
Page 15 of 62

Page 16

Page 16 of 62

Page 17

PKC Nature Restoration Fund 2023-24 Report. NatureFund@pkc.gov.uk
Appendix 1
Perth & Kinross Nature Restoration Fund 2023-24 Report 
Introduction 
In late June 2023, the council received £353,000 from the Scottish Government
Nature Restoration Fund (NRF). The purpose of the fund is to address the
biodiversity crisis and its causes - habitat loss and fragmentation, and invasive
species - while recognising the need to address both climate change and
biodiversity crises at the same time. A key stipulation of the fund this year is that
at least half of the funding is dedicated to developing nature networks. Effectively
functioning nature networks connect existing nature rich areas through habitat
corridors, habitat ‘stepping stones’, or habitat restoration. These networks are
crucial for allowing species to move and adapt in response to a changing
environment. Nature networks have two main strands:
1) Connecting all sites contributing towards 30x30 (the commitment to protect
at least 30% of land and sea for nature by 2030)
2) Connecting biodiversity within and across urban, peri-urban and rural
landscapes 
Strategically allocating funds has allowed the prioritisisation of projects that focus
on creating habitat corridors and stepping stones. Involving community
organisations and local landowners in the development of nature networks has
further helped to ensure the long-term success of conservation efforts. 
A total of 23 applications were received and evaluated by the NRF delivery working group. 16 projects were
awarded funding, with unsuccessful applicants receiving advice on improving their applications for future
years. One project by Milnathort Primary School has been deferred to 2024-2025. The funded projects
involved various activities, including invasive species control, riparian habitat restoration, green corridor
creation, wildflower meadow establishment, pond restoration and creation, and biodiversity enhancement in
greenspaces. 
Nature Networks Development
14 of these projects contribute to the development of nature
networks. Many are located within Buglife’s B-line corridor areas,
expanding a network of nectar-rich habitats and creating stepping-
stones between them. Other projects focused on restoring habitat
within protected areas or improving connectivity to these sites.
Several initiatives restored habitat on the Tay Special Area of
Conservation (SAC), while some connected native woodlands
together, creating habitat corridors for wildlife to move. 
The funding supported projects by the Council and external community partners including landowners,
community groups, and charities. The significant progress achieved in restoring biodiversity across the region
is a testament to the dedication and hard work of the funded partners and the invaluable contributions of
volunteers. 
Kinross-shire Civic Trust
volunteers planting native plug
plants for pollinators around new
ponds in the South Queich area.
Building an enclosure for tree planting at Alt
Eigheach - Rannoch and District Angling Club.
5
Page 17 of 62

Page 18

2 
Grant Awardee Testimonials 
Rhododendron ponticum chainsaw clearance followed
by an application of herbicide to the cut stump.
Organisation: Bamff Wildland 
“We were able to plant 40 riparian
copses and remove a large area of
Rhododendron ponticum with this
grant. The process has been very
straight forward, and the benefits
will show for years to come. We are
delighted.”  - Sophie 
Organisation: National Trust for Scotland 
“We would like to say a big thank you to PKC's Nature
Restoration Fund for supporting and funding our project.
This has allowed up to improve the riparian habitat on the
banks of the river Tay following the removal of Invasive
non-native species including Japanese Knotweed and
rhododendron. This will help with our long-term vision of
stabilising the banks against flood damage whilst
supporting native flora and fauna, including pollinators,
through the planting of the native trees. We hope locals
and visitors enjoy seeing the habitat being restored and
expanding over the future.” - Louise 
National Trust for Scotland volunteers planting trees and
putting up tree protection.
Organisation: The Lunan Burn Wildlife Cluster 
“The fund application process was
straightforward and responses to both the
application and queries were promptly and
helpfully responded to. The fund achieved
exactly what it was designed for, achieving
nature and habitat restoration through
capital works that will provide long-term
benefit across a large area that is designated
for its biodiversity.”  - Ailsa 
Riparian tree planting along the Cattymill Burn.
Page 18 of 62

Page 19

3 
2023-2024 Nature Restoration Projects List 
Purchase of Four Amazone Profihopper Machines
• Applicant: PKC Operations
• All wards 
These machines are designed for meadow and relaxed
mowing operations, playing a crucial role in a
comprehensive plan to restore and enhance grassland
areas for the benefit of both nature and local
communities. The use of these machines is integral to
creating diverse and well-maintained meadow habitats,
which serve as critical 'stepping stones' for pollinators
and other wildlife. This not only enhances local
biodiversity but also contributes to the broader
development of nature networks. 
River Almond Invasive Species Control
• Applicant: PKC Climate Change
• Multiple Wards: Almond and Earn, Strathtay,
Perth City North, Perth City Centre 
Following a successful first year of catchment scale
invasive species control, Perth and Kinross Council
have continued to work in partnership with the
Scottish Invasive Species Initiative, local volunteers,
and contractors to remove giant hogweed,
Japanese knotweed, and American skunk cabbage
from the river Almond, with 25km of the river under
management. Improving the condition of the Tay
SAC contributes towards nature networks delivery. 
Ponds for Puddocks
• Applicant: Tayside Biodiversity Partnership
• Multiple Wards: Almond and Earn, Blairgowrie and
the Glens, Perth City Centre, Strathtay 
SuDS Ponds Enhancement works took place across
Blairgowrie, Perth, Murthly, and Abernethy. Six ponds
were cleared of invasive vegetation, creating areas of
open water and improving conditions for amphibians.
Native pond-edge wildflowers were planted to benefit
pollinators and other invertebrates. Amphibian ladder
workshops and installations further supported
amphibian populations. The project received help from
67 local volunteers including the PKC Biodiversity
Ambassadors, community groups, school and university
students. The project creates a network of high-quality
habitats for amphibians, pollinators, and other wildlife. 
Page 19 of 62

Page 20

4 
Errol Village Nature Restoration Project
• Applicant: Carse of Gowrie Group (SCIO) &
Friends of Cistern Green
• Ward: Carse of Gowrie 
The project involved planting native trees and
sowing wildflowers to enhance biodiversity in two
areas of land on either side of Errol Village. The
establishment of green corridors and stepping
stones ensures that wildlife can move more freely
throughout Errol. 
Braes of Alyth Wild Cores & Corridors
• Applicant: Bamff Wildland
• Ward: Strathmore 
A total of 40 riparian copses were established along the
waterway traversing Bamff Wildland, each planted with
diverse native trees and scrub species including downy
birch, grey willow, Scottish aspen, common alder, hazel
and oak. Additionally, 40 days of rhododendron
ponitcum removal by chainsaw was completed, with
significant progress made in eradicating this invasive
species from large areas. The removal of rhododendron
will create space for many native species like foxglove,
downy birch, rowan and others. This project contributes
towards nature networks through creating a riparian
woodland corridor. It is also part of Montrose to Dunkeld
B-Line initiative and borders the Den of Alyth SSSI.   
Kettins Biodiversity Conservation Project
• Applicant: Kettins Parish Community Council
• Ward: Strathmore 
This project involved converting sections of
greenspace into biodiverse meadow and wetland
habitats. Additionally, pollinator-friendly native
fruit and nut-bearing trees were planted, enhancing
local biodiversity, and creating valuable habitats for
wildlife. Creating biodiverse habitats within Kettins
provides stepping stones for wildlife to move
between different habitats. 
Page 20 of 62

Page 21

5 
Glassie Bike Park Rewilding Phase 2
• Applicant: Glassie Bike Park
• Ward: Highland 
Diversifying Glassie Bike Park through native tree
planting on the site aims to help create wildlife corridors,
benefiting local biodiversity by providing essential
shelter and habitat spaces. The newly planted trees
connect isolated patches of natural habitat within the
park, reducing habitat fragmentation. 
Alt Eigheach Habitat Improvements Project
• Applicant: Rannoch and District Angling Club
• Ward: Highland 
The restoration of riparian woodland along the Alt
Eigheach river to reduce riverbank erosion and curb
sediment washout. 21 large and 20 small
compounds were constructed for planting native
trees, helping to reduce water temperature,
creating a more favorable environment for aquatic
life. As a result, invertebrate populations are
expected to thrive, providing a crucial food source
for fish. Improved habitat conditions will benefit
salmon and trout populations, supporting both
biodiversity and local angling activities. Improving
the condition of the Tay SAC contributes towards
nature network delivery. 
Dunkeld Riverbank Restoration
• Applicant: National Trust for Scotland
• Ward: Strathtay 
Works included completing the eradication of
Rhododendron Ponticum, an invasive non-native
species, across a one-mile stretch of riverbank.
Additionally, over 150 native broadleaf trees and shrubs
were planted to stabilise the riverbank, mitigating
erosion and flood damage. These tree species will
provide essential habitat and support for pollinators and
withstand coppicing by beavers once established. The
project included the installation of wire guards around all
trees to protect against browsing damage from deer,
rabbits, and beavers during the establishment phase.
This project contributes towards the nature network
development by improving the condition of the Tay SAC,
restoring native vegetation and enhancing habitat
quality along the riverbank. 
Page 21 of 62

Page 22

6 
The Lunan Burn and Clunie Loch Catchment
Restoration Project
• Applicant: The Lunan Burn Wildlife Cluster
• Ward: Strathtay 
The project focused on improving water quality and
freshwater habitats along the Lunan Burn and Loch
Clunie Site of Special Scientific Interest (SSSI). It
involved measures to reduce diffuse pollution.
Planting hedging and native trees helped create
linear habitat corridors between existing core areas
of native woodland, facilitating species movement.
Reducing pollution and planting riparian vegetation
improves the condition of the protected site,
contributing towards nature network delivery. 
Boosting Biodiversity at Denmarkfield 
• Applicant: Rewilding Denmarkfield
• Ward: Strathtay 
The project included planting 470 meters of pollinator-
friendly hedgerows to connect existing wildlife corridors,
sowing a 2-acre pollinator bank with native local
wildflower seed, and the creation of a 2000m2 wetland
in the House Field and a wildlife pond in the Education
Hub. Furthermore, collaboration with Forest Research
and the University of Reading aimed to create an
experimental design, known as Fungi4Restore, by
inoculating an area of ex-arable land with soil from an
Oak woodland and planting local provenance Oak
saplings to increase soil microbes and underground
biodiversity. The project creates pollinator-friendly,
flower-rich habitats that contribute to Buglife's B-Line
network. The woodland mosaic and hedgerows will form
migration corridors for woodland wildlife, connecting to
ancient woodlands in the landscape. 
Marybank Farm Habitat Restoration
• Applicant: Marybank Farm
• Ward: Strathtay 
The project involved a range of measures aimed at
enhancing biodiversity and habitat diversity on the
farmland. This included restoring and creating
ponds, establishing hedgerows to facilitate wildlife
corridors, creating wildflower meadows, installing a
beebank to support pollinators, and planting trees.
The creation of wildflower rich areas within the B-
line area contributes towards nature networks by
creating stepping-stones habitat for wildlife.
Page 22 of 62

Page 23

7 
Comrie Croft Wild Connections
• Applicant: Comrie Croft
• Ward: Strathearn 
The project successfully connected and enhanced
diverse native woodland habitats. The project
included woodland creation, wildflower meadow
establishment, species enhancement in existing
woodlands, and the removal of invasive species
such as sitka spruce, as well as plastic tree tubes,
and redundant wire fencing. Connecting and
enhancing woodland and meadow habitats helps
creates corridors and stepping stones, facilitating
wildlife movement. 
Kinross Rain Gardens Trail
• Applicant: Kinross-shire Civic Trust
• Ward: Kinross-shire 
A continuation of the Kinross rain gardens trail project.
This encompassed four projects including pollinator
friendly planting around the edges of the Kinross park
and ride; landscape work to enhance wetlands at the
South Queich Flood Area; new hedgerow at the Kinross
Rugby Club; and surveying at South Queich for design
work to create amphibian pools within the South Queich
catchment. This project enhances connectivity for
aquatic species, contributing to the development of
nature networks along watercourses. The Kinross Rain
Gardens Trail through Kinross-shire connects with the
Loch Leven Heritage Trail and the pollinator pathways
network.   
Birds, Bees, Bogs and Frogs- creating a safe
corridor for nature
• Applicant: PKAVS
• Ward: Perth City Centre (the Walled Garden) 
The project established a large wildlife pond and
bog garden, providing habitat for a diverse range of
native plants, supporting pollinators, birds, and
insects. The pond offers a home for amphibians and
insects, evidenced by the presence of pond skaters,
great diving beetles, frogs, and an increase in birds
and waterfowl to the area. Pollinator highways
were created through sowing native wildflower
seeds, connecting different areas of the garden,
and contributing to Buglife's B-Line network. 
Page 23 of 62

Page 24

Page 24 of 62

Page 25

Perth and Kinross Council
Climate Change and Sustainability Committee
21 August 2024
YEAR-ROUND WEATHER EVENT RESPONSE
Strategic Lead - Environment and Infrastructure
(Report No. 24/217)
1. PURPOSE
1.1 The purpose of this paper is to show how, in recognition of changing weather
patterns, we are reshaping our approach to severe weather planning. This
move is from the existing focus on preparations for the impact of winter
weather/ snow to an approach that recognises that severe weather events can
take place at any point in the year.
1.2 This paper acknowledges the previously published weather events
improvement plan (Reports 23/323, 24/45, 24/123, and 24/175 refer). It also
incorporates the specific actions within that improvement plan to reflect and
review current practices based on learning from the October 2023 weather
events. Appendix 4 sets out how this report aligns to the improvement plan
actions.
1.3 This paper also details the roles and responsibilities of various teams within
Perth and Kinross Council, and the key partner agencies and organisations
involved in the preparation for, assistance during, and recovery from a
weather event.
2. RECOMMENDATIONS
2.1 It is recommended that the Committee:
 Notes the range of responsibilities and approach taken by teams across
the Council to respond to severe weather events all year round
 Approves the proposed improvements to the approach noted against
each service area in section 5
3. STRUCTURE OF REPORT
3.1 This report is structured over the following sections:
 Section 4: Background / Main Issues
 Section 5: Responsibilities and Proposed Improvements in Responding
to Severe Weather Events
 Section 6: Conclusion
 Appendices
6
Page 25 of 62

Page 26

4. BACKGROUND / MAIN ISSUES
Changing weather patterns
4.1 The effects of climate change are showing in the changing patterns of the
weather. This is both in terms of frequency and severity of weather events.
We are seeing increases in storms, flooding and drought, and changes in
snowfall/ snowmelt.
4.2 These variations are having impacts on communities, businesses, visitors and
the environment across Perth and Kinross. Properties have been subjected to
repeated flood events. Travel routes are now disrupted with increased
frequency, affecting the movement of people and goods. Local agriculture has
yields affected by over or under watering. Ecosystems are disturbed.
Development and demographics change as landscapes change along with
population densities and utility usage.
4.3 All of which means that we can no longer base our planning on the traditional
seasonal weather patterns. We are not just responding to severe weather
events in winter, but also summertime. And, as we have seen in recent years
there may be a series of weather events in quick succession, meaning that we
must recover from each event more rapidly as resources will quickly be
needed for the next one.
4.4 Much of the detail about the environmental changes that have taken place,
and will continue to take place, is provided on the Perth and Kinross Climate
Action website.
4.5 This follows the Council’s declaration of a climate emergency in June 2019,
and the subsequent proposals to create and implement an action plan to
address the emergency (Report 19/362).
4.6 At the same time as these environmental changes, we also need to be more
flexible and creative in using the limited resources that we have available to
prepare for and respond to incidents. As previously reported to committee we
have had a lot of success already in working with communities and individuals
to improve local resilience. Growing this is an essential part of a year-round
approach to severe weather events.
4.7 Officers have shared an annual Winter Maintenance Policy and level of
service update to the relevant committee each autumn. This has set out
staffing arrangements for an out of hours service during the winter period to
manage the impact of weather, particularly snow and ice, on roads and
footways.
4.8 Over the past couple of years officers and committee members have
recognised in discussions on this annual report that there is a need to
consider arrangements for responding to severe weather events year-round.
This report is a response to those discussions and looks at resilience planning
and preparedness for severe weather events throughout the year across
Council teams and with partners.
Page 26 of 62

Page 27

4.9 It should be noted that in periods of extreme weather (intense rain, wind, snow
and temperature variation) resources will always require to be prioritised. The
geography of Perth and Kinross also poses particular challenges as different
weather conditions may be experienced in different parts of our area at the
same time stretching the resources we do have. For example, while one area
is experiencing flooding due to heavy rainfall another may have significant
snowfall and/or ice. Officers will not be able to respond to all requests for
assistance nor address all issues raised, and expectations will require to be
managed. The support of elected members, community resilience groups and
individuals in helping to manage the expectations of the wider population of
Perth and Kinross is always appreciated.
4.10 It should also be noted that everyone has a responsibility to manage the
impact of weather on their own infrastructure, and whilst Council officers will
endeavour to assist, the principal responsibility lies with the asset owner.
5. RESPONSIBILITIES AND PROPOSED IMPROVEMENTS IN
RESPONDING TO SEVERE WEATHER EVENTS
5.1 Council teams are involved in a range of ways to respond to severe weather
events. There are strong internal relationships between teams which help to
make sure that we are able to work across responsibilities for the benefit of
residents and partners. This section provides information on the
responsibilities and roles of different teams as well as existing working
arrangements. Section 6 then details any changes and improvements which
have been identified to support a year-round response to weather events
approach.
5.2 It may be that following review current processes and procedures do not
require adjustment to ensure a year-round response. Where that is the case,
the text will note this. Some adjustments will require time to implement, and
the text will also acknowledge this.
Perth and Kinross Council’s responsibilities
5.3 The Council is a Category One Responder in terms of the Civil Contingencies
Act. The Civil Contingencies Act covers a wide range of potential incidents
beyond the severe weather events which are the subject of this report. The
Act requires Category One Responders to:
 Assess the risk of emergencies occurring and use this to inform
contingency planning.
 Put in place emergency plans.
 Put in place business continuity management arrangements
 Put in place arrangements to make information available to the public
about civil protection matters and maintain arrangements to warn, inform
and advise the public in the event of an emergency.
 Share information with other local responders to enhance co-ordination.
Page 27 of 62

Page 28

 Co-operate with other local responders to enhance co-ordination and
efficiency.
 Provide advice and assistance to businesses and voluntary
organisations about business continuity management (local authorities
only).
5.4 Emergency preparedness is a devolved matter for the Scottish Government
and overall responsibility for civil protection policy in Scotland sits with the
Scottish Resilience Division of the Scottish Government.
5.5 To execute their civil protection responsibilities the Scottish Government have
established 3 Regional Resilience Partnerships (RRPs) in South, West and
North. Local Resilience Partnerships sit under the umbrella of these RRPs
and Perth and Kinross Council fits into North RRP in the Tayside Local
Resilience Partnership (TLRP).
5.6 TLRP brings together Category One and Two Responders to plan for,
respond to and recover from emergencies. Environmental, war and terror
activations are headed by Police Scotland whilst human health is handled by
NHS Tayside colleagues.
5.7 Emergencies which are not at scale and localised to Perth and Kinross are
addressed by Perth and Kinross Council and Health and Social Care
Partnership staff (potentially standing up a Perth and Kinross Council Incident
Management Team depending on the nature of the emergency) and deploying
resources as required with or without the help of partners such as Community
Resilience Groups, Police Scotland and Scottish Fire and Rescue.
5.8 The Council has an Emergency Response Duty Officer (ERDO) on call 24
hours a day, 365 days of the year. A number of Council staff from across the
organisation are part of this rota which is the first point of call, via a dedicated
pager number, to ensure rapid activation of the Council’s response protocols
as required. Members of the Executive Leadership Team are also on a rota
ready to respond 24 hours a day, 365 days a year to lead the Council
response to an emergency if required. This is in addition to the Council’s
normal out of hours services for individual and routine incidents.
5.9 The existing ERDO and ELT arrangements already include cover for year-
round severe weather and other civil contingency incidents. No further
changes are therefore required for the purposes of this report.
Partner agencies
5.10 There are a small number of key external agencies that undertake a range of
activities relating to weather event responses. They are an active part of the
weather event response process.
5.11 The key agencies of note include: SEPA, the Met Office, Scottish Flood
Forum, Scottish Fire and Rescue, Police Scotland, Scottish Ambulance
Service, utilities providers (Scottish Water, Scottish Power/ SSE, SGN),
transport agencies (Transport Scotland, ScotRail) and Public Health Scotland.
Page 28 of 62

Page 29

5.12 As there are references to how the Council particularly uses information from
SEPA and the Met Office in planning and responding to severe weather
events, more details on these agencies can be found in Appendix 2.
Role of Council services
5.13 More detailed information on the role the Council plays during a severe
weather event, is covered in the following sections listing the responsibilities
of our teams (statutory and otherwise), the existing approach taken, and the
proposed approach to ensure an appropriate year-round severe weather
event response.
Roads and footways network
Responsibilities
5.14 The Council is responsible for a 2,500km road network and thousands of
kilometres of footways and footpaths. Road maintenance, winter maintenance
and reactive emergency responses are provided through a partnership
between the Council and Tayside Contracts (Report 24/160).
5.15 As ‘roads authority’ the Council provides a full range of services, including
statutory duties associated with the management and maintenance of the
roads infrastructure as required by the Road (Scotland) Act 1984 and the
Transport (Scotland) Act 2005.
5.16 The Scottish Government is responsible for the maintaining the 250km of
trunk road network within Perth and Kinross. The M90, A90 and A9 between
Broxden and Keir Roundabout is managed by Amey (since August 2022). The
A9 north of Broxden and A85 has been managed by BEAR (Scotland) Ltd for
many years.
5.17 In relation to the impact of severe weather, whilst the Roads (Scotland) Act
1984 allows for the provision and maintenance of barriers or other works
considered necessary to protect a public road against flood, landslide or other
hazards of nature, only snow and ice warrants a specific duty under section
34. That is “A roads authority shall take such steps as they consider
reasonable to prevent snow and ice endangering the safe passage of
pedestrians and vehicles over public roads.”
5.18 The Council is also responsible for the management of road drainage assets
(gullies/ditches/soakaways etc). These are designed to collect rainfall in the
course of normal weather patterns which falls onto the public road and to
store the water until solids can settle and separate out, so they do not migrate
into the pipe/watercourse network. Gullies are not designed as a storage for
floodwater nor to take water from surrounding land in severe weather events.
The Roads Maintenance Partnership undertakes a regular gully cleansing
programme to remove solids that have settled in the gully pot. However, it is
important to be aware that even a completely clean gully pot will not drain
during heavy and persistent rain if the pipe work is at capacity.
Page 29 of 62

Page 30

5.19 Overflowing sewers/ sewer manholes are the responsibility of Scottish Water.
Existing approach – winter maintenance period (mid-October to
mid- April annually)
5.20 Our Winter Maintenance Policy (Report 23/291) allows the Council to meet
our statutory obligations under section 34 of the Act, by providing the most
effective winter maintenance service we can within the resources we have
available through the Roads Maintenance Partnership. The winter
maintenance budget for the Roads Maintenance Service (£4.245m) is also
used to fund other weather-related emergencies, such as works to mitigate
immediate risk of flooding to properties/roads and wind damage, directly
affecting free movement across the network.
5.21 Around 910km of the Council’s 2,500km road network is designated as a high
priority for winter service. These priority routes receive precautionary evening
treatment and early morning preventative treatment that aims to keep them
generally ice-free, although this can never be guaranteed. The Council also
provides a high level of service on priority footways in busy urban areas.
Lower levels of treatment are provided on the remainder of the carriageway
and footway network, as and when required, during normal working hours.
5.22 Tayside Contracts provide the labour to drive all carriageway gritters. They
are attempting to internally address the impacts of the national shortage of
HGV/LGV drivers by training LGV drivers and staffing all gritting routes with
their own direct labour. A combination of Council waste/greenspace
operatives, TC roadworkers and private operators provide footway treatment.
5.23 In periods of prolonged severe winter weather, resources are targeted
towards keeping the strategic road and footways network open. As a result, it
can be a considerable time (in some cases several days) before lower priority
routes are reached. This can be understandably disappointing to residents
who use these lower priority roads and footways, and we recognise the
importance of consistent and clear communication to manage public
expectations in these periods. Where there is minimal risk in deviating from
the priority treatment, officers will direct resources to these other areas.
5.24 Experience of recent winters has shown that the level of service set out in this
Policy is generally achievable. However, winter seasons are always
unpredictable. 2023/24 was what can be described as a fairly typical winter
(acknowledging the changing nature of what is typical set out in Section 4),
with regular afternoon/evening treatments to prevent ice forming overnight,
followed by morning treatment where wet weather had washed the salt off the
roads and thus required re-treating.
5.25 Planned activity is based on forecast road surface temperatures rather than
air temperatures as reported in news forecasts. Operationally, marginally
fewer actions were carried out compared to the previous winter but still sit
around the six-year average, which is why it is considered a typical winter.
Page 30 of 62

Page 31

Figure 1 - Operational Activity Statistics details activity over last winter
compared to previous years.
Figure 1 - Operational Activity Statistics
5.26 The staff and workforce in place for winter service delivery also cover all other
incidents arising during the “winter period” of mid-October to mid-April.
Existing approach – outwith winter period
5.27 The Council and the Roads Maintenance Partnership have plans in place to
respond to out of hours emergencies and severe weather events outwith the
winter maintenance period. These are undertaken based on weather warnings
and flooding forecasts from partners as detailed earlier in this section.
5.28 Where there are warnings of severe weather which is likely to impact upon the
Council’s roads and footways network there will be an internal assessment of
areas of risk within the forecasted weather system and any proactive
measures which can be taken to prepare for a response, such as checking
and clearing trash screens at areas of known risk. Staff will also be contacted
and asked to standby to be ready to be called out.
Page 31 of 62

Page 32

Proposed approach – winter maintenance period
5.29 Due to the specific statutory duty in relation to snow and ice set out in section
5.17 it is important that we continue to deliver a specific Winter Maintenance
Policy and service delivery. Given the activity during the winter maintenance
period over the past six years we believe that the level of service delivery from
2023/24 remains appropriate for 2024/25 and no changes are proposed.
5.30 Roads Maintenance Partnership Winter Cover will commence on 14 October
2024 and run until 13 April 2025. As per the Winter Maintenance Policy during
this period in ice and snow conditions, and when ice or snow is forecast and
roads are not dry, treatment and pre-salting will be carried until 9pm on
strategic routes connecting main centres of population. Complete morning de-
icing on strategic routes will also take place by 7.30am (9am on Sundays and
nationally recognised public holidays). Additionally, from December to January
pre-salting and treatment will be carried out in ice and snow conditions
overnight from 11.30pm-8am on the most important strategic routes. Standby
vehicles will also be available across Perth and Kinross – 22 vehicles during
the peak periods of end October to late February.
5.31 Rotas will be put in place to adequately cover the level of service provided in
accordance with this policy. However, in periods of prolonged severe weather,
there may be an impact on service delivery due to a requirement to ensure
that operatives are given adequate (statutory) rest breaks and do not exceed
driver hours.
Proposed approach – outwith winter maintenance period
5.32 Staff, labour and plant resources will be available for out of hours situations
and be deployed according to the corporate priority of the Council depending
on the type of emergency event. This will be based on forecast advice from
partners and may include impacts from temperature variation and strong
winds leading to tree fall/ debris obstructing roads. However, we recognise
that flooding is the most likely and most concerning outcome of a year-round
weather event and are therefore providing more detail on plans for responding
to those circumstances.
5.33 The Council will manage, maintain and operate flood protection schemes in
accordance with operational manuals and guidance. A sufficient Out of Hours
(OOH) rota will be in place to deal with predicted flooding issues.
5.34 Following the flooding event on 7-8 October 2023 a review of the Perth Flood
Scheme is ongoing. The following actions are being undertaken:
 The warnings and triggers levels have been reviewed and are
considered to still be relevant.
 Council owned telemetry site alarms and triggers are being reviewed.
 Business contacts in lower Friarton and Harbour area updated, and text
messaging system being set up for warning resident/business groups
impacted when gates are closed.
Page 32 of 62

Page 33

 Residents to be encouraged to sign up to SEPA’s free Floodline service
(Floodline | Scottish Environment Protection Agency (SEPA)) providing
live flooding information and advice on how to prepare for or cope with
the impacts of flooding 24 hours a day, 7 days a week.
5.35 All gates in the scheme are being assessed to establish if there are
alternatives to the existing arrangements and budget implications will be
available for consideration later in the year. These could include:
 Permanently closing a gate to reduce the number which require staff to
be deployed to close them in a flooding event.
 Alternative barrier systems to reduce the time taken and resources
required to close the gate.
5.36 The assessment includes the impact the gate has on people movement and
amenity value, future maintenance requirements and costs. Modern
lightweight barrier systems have already been ordered to replace the existing
heavy promontory and Queens Bridge systems. These are expected to be
delivered in November 2024 and will ensure that if required these can be
deployed more quickly and with fewer resources than the original barrier
solutions.
5.37 Lightweight contingency flood barriers in two different types (Boxwall and WL-
watergate system) have also been purchased. These can be used at different
locations and can also be deployed outwith Perth. See Appendix 3 for images.
5.38 The revised protocol agreed with SEPA to advise of flow and tide data
previously shared with elected members, will be kept under annual review and
RMP will work in partnership with SEPA to review data during flood events.
5.39 In advance of amber/ red flood warnings via the SEPA issued Flood Guidance
Statement, RMP will adjust staff resources to ensure anticipated scenarios
can be adequately covered. This will include close working with other Council
teams to supplement activity and to access additional personnel to help with
distributing materials which may help with protecting public roads and
footways, such as sandbags. Additional resources will also be accessed
through:
 Parking and Civil Contingency officers and Community Wardens to
assist in flood gate closures and eyes on the ground.
 Waste and greenspace operatives Mon-Sun during normal working
hours to assist with clearance of trash screens.
5.40 While as noted at section 5.18 road gullies are not designed to store water or
take excess water from surrounding lands, committee members may wish to
be aware that a separate report is being submitted to the Economy and
Infrastructure Committee later this month providing more detail on the
approach to and our performance in maintaining our gullies infrastructure.
Page 33 of 62

Page 34

Road bridges and other structures
Responsibilities
5.41 Alongside our roads and footways network the Council is responsible for a
number of road bridges and road retaining walls which can also be impacted
by periods of severe weather. Our Structures Team implement various
procedures to ensure that the condition of road bridges and larger road
retaining walls are monitored for public safety.
Existing approach – year-round
5.42 Using monitoring and forecasting information provided by partners as detailed
previously, and in liaison with other Council teams also using this information,
the Structures Team prepare for and ensure that we can respond as quickly
as possible to the impact of severe weather events on our structures by:
 Maintaining a list of scour susceptible structures that require urgent
monitoring both during and after weather events, informed by scour
assessments as may be required.
 Identify, together with colleagues, structures which may be impacted by
predicted weather events and carry out inspections of those structures
during and/or after the weather event.
 Working with the Roads Maintenance Partnership, Tayside Contracts
and External Contractors as required to instigate emergency make safe
measures required to road bridges and larger road retaining walls at the
earliest opportunity.
Proposed approach – year-round
5.43 The Structures Team has reviewed and updated its procedures to improve
resilience from across the team regarding provision of urgent bridge
inspections where severe weather events fall over weekends. This provides a
more proactive approach to staff resourcing to improve monitoring of the
condition of known potentially scour susceptible bridges across the public
road network during/ after weekend storm events. This approach also ensures
that staff safety remains paramount with appropriate lone working procedures
in place as may be required.
5.44 The Structures team are currently in the process of liaising with both Dundee
and Angus Councils and are engaging with consultants for the preparation of
a Road Bridge/ Retaining Wall Emergency and Maintenance Works
Framework Contract. The aim of the framework contract is to allow early
appointment of a suitable contractors sourced from a large pool of competent
suppliers to assist the Council in the make safe and repair of urgent road
bridge/ retaining wall works during and after flood events at the earliest
opportunity. The framework contract will also seek to minimise time when
Page 34 of 62

Page 35

procuring less complex road bridge and retaining wall works in comparison
with current arrangements.
5.45 In tandem with this approach the Structures team are also investigating in
liaison with the Procurement team, the Scottish Collaboration of
Transportation Specialists (SCOTS) Bridges Group and Scotland Excel as to
whether a National Road Bridge/ Retaining Wall Emergency and Maintenance
Works Framework Contract can be procured via Scotland Excel. 
5.46 Both of these tasks are significant procurement exercises and affected by
other priorities and also key inputs from external bodies, accordingly the
framework is currently estimated to be live in financial year 25/26.
Housing
Responsibilities
5.47 The Council has a statutory requirement to provide emergency
accommodation for anyone displaced during any emergency or major
incident, including significant weather events, where they have no other
suitable place to live.
5.48 As a landlord we have additional responsibilities to ensure that our tenants
have access to a home that’s wind and watertight.
5.49 Homeowners and private landlords are responsible for managing the impact
of weather on their own properties. Ready Scotland and other services such
as the Scottish Flood Forum can provide advice and assistance on how to
prepare for and deal with emergencies which impact upon an individual’s
home.
Existing approach for Council tenants – year-round
5.50 Our Housing Repairs Service offers an out-of-hours emergency service 24
hours a day, 365 days a year for all Council tenants. When there is a weather
event or an incident, that could impact on our tenants and their homes, the
service deploys an emergency plan to monitor call levels and nature of
repairs, ensure there is effective communication to tenants, arrange for
additional staff and monitor the situation.
5.51 When there is a weather event or an incident that could impact on Council
tenants and their homes, Locality Teams will undertake welfare checks
(phone or in person) on the most vulnerable tenants, contact tenants living in
properties at risk (flooding), arrange for support and assistance to be provided
– food parcels, meter top ups, water, heaters, alternative accommodation etc
and liaise with other services such as welfare rights, social care, voluntary
sector etc.
Page 35 of 62

Page 36

5.52 The existing arrangements for Council tenants already include cover for year-
round severe weather and other civil contingency incidents. No further
changes are therefore required for the purposes of this report.
Existing approach for homeowners and private tenants – year-round
5.53 The Housing Service provides housing advice and assistance to those in
housing need, including housing issues caused by adverse weather or
another significant incident. In normal working hours this is provided through
the Housing Options and Support Team, and outwith working hours, 365 days
a year, this is through our emergency homeless service, based at Greyfriars
House in Perth.
5.54 Our Housing Service works closely with colleagues involved in preparing for
and responding to a severe weather event to:
 Ensure people are offered a range of advice and support – to keep the
person/ household safe.
 Provide emergency accommodation – hotel or B&B or temporary
accommodation within the Council’s portfolio.
 Provide support – food, clothing, travel warrants, assistance with
transport etc.
 Store belongings.
 Liaise with landlords on behalf or private tenants.
 Liaise with other services - welfare rights, social care, voluntary sector
etc.
5.55 Depending on the size and scale of a weather event the Council may set up a
rest centre via the Emergency Response Duty Officer to provide a place of
rest and support for displaced households. Advice and information may then
be provided via those centres.
Proposed approach for homeowners and private tenants – all year round
5.56 We will build on the existing support provided by the Housing Service to
ensure that consistent advice and information can be provided to all
households impacted by severe weather events, with a focus on welfare
support. A new leaflet for households advising on preparing for a flood and
advising on the assistance available afterwards is currently being finalised to
support engagement with homeowners and private tenants.
5.57 Records of properties and vulnerable households impacted (subject to GDPR
constraints) will be coordinated between Services to ensure that support is
targeted and provided in the most appropriate manner. This could be advice
on impact mitigation, welfare / temporary accommodation, linking in with key
agencies and services or remediation approaches.
5.58 In partnership with the Flooding Team, the Housing Service has improved the
stock of flood prevention measures in flood risk areas for deployment in
emergency situations.
Page 36 of 62

Page 37

Caring for People
Responsibilities
5.59 Perth and Kinross Health and Social Care Partnership (Adult Social Work and
Social Care – ASW&SC) have a statutory requirement to provide social work
assessment, social care and support to vulnerable clients aged 16 or over.
Existing approach – year round
5.60 When there is a severe/ adverse weather event or an incident that could
impact on ASW&SC clients either in their own homes, day care
establishments, or care homes, ASW&SC Teams will evoke their Business
Continuity Plans to ensure the health, safety, and wellbeing of vulnerable
clients is maintained.
5.61 ASW&SC has established guidance to ensure that in cases of severe weather
all staff are aware of the arrangements and escalation process and make
every effort to attend their place of work. This guidance also details the
responsibilities of ASW&SC Teams during severe weather/ adverse events.
This guidance includes information on staff transport and the escalation
process should there be a critical request for transport to aid staff in attending
to vulnerable clients.
5.62 ASW&SC Teams all have “Vulnerable Person Lists” in place which are held
securely and centrally in a form which can be accessed by the relevant
member of staff. These lists are updated monthly to ensure the most
vulnerable clients can be identified and supported as needed subject to the
severe weather event.
5.63 All ASW&SC Teams also have contact lists and winter plans which support
Health and Social Care Partnership contingency arrangements, detailing
names and contact numbers of responsible lead workers across teams.
5.64 ASW&SC Teams work jointly with NHS colleagues and the Council’s
Emergency Response Duty Officer during any severe/ adverse weather event
or an incident to ensure that:
 Clients are offered the care and support they require to ensure the
health, safety, and wellbeing of vulnerable clients is maintained.
 Clients are supported to access suitable / alternative care and support
either in their own homes or at an alternative location e.g. Care Home,
Rest Centre.
 There is a provision of reassurance and advice, either physically or
virtually.
 There is partnership working with other services – NHS, third and
voluntary sectors, etc.
Page 37 of 62

Page 38

5.65 A severe weather event may in itself cause additional vulnerabilities for people
who are otherwise not known to ASW&SC teams. Where there is any impact
on households there is a coordinated effort to ensure that all vulnerable
households are contacted and support offered where needed. The Council,
ASW&SC, NHS and SSE will all contribute to this approach. Often Community
Resilience Groups are able to identify individuals in their local area who may
not be known to organisations, but who may need support in the context of the
type of emergency at hand.
5.66 The existing arrangements for Adult Social Work and Social Care teams
already include cover for year-round severe weather and other civil
contingency incidents. No further changes are therefore required for the
purposes of this report.
Education and Learning
Responsibilities
5.67 The Council has a duty to ensure that each school is open to pupils for a
period of 190 days in any school year, except where prevented by
circumstances outwith their control.
Existing approach – year-round
5.68 Our Education and Learning Teams have processes that have been in place
for a number of years to allow all schools/ campuses to be in a state of
readiness to deal with situations of severe weather. Guidance is available to
schools/ campuses and is reviewed on an annual basis. A central support
team assist school management teams via a severe weather line in instances
where weather situations are widespread or where a red weather warning has
been issued.
5.69 The Headteacher (or nominated deputy) is responsible for determining
whether a school/campus will close in the event of severe weather, taking into
account information on the individual local circumstances. They are asked to
refer to the Met Office weather reports, information on roads from Traffic
Scotland and are encouraged to sign up for Floodline Scotland alerts to inform
their decision. The exception to this is if a blanket closure (or blanket partial
closure of some schools) is required or if the closure is not related to severe
weather ie failure of an essential service such as power, water etc.
5.70 The Education and Learning Senior Management Team will advise if a blanket
closure of some or all schools is to be implemented. This decision is taken
following information received from the Scottish Government relating to the
likely severity and impact as a result of the weather conditions expected, such
as red weather warnings and through discussions with the Council’s Incident
Management Team. Collaboration with other local authorities will also take
place where appropriate. Schools are advised via email regarding this.
Page 38 of 62

Page 39

5.71 All schools/ campuses have an emergency closure plan which is prepared
following a risk assessment being undertaken to take account of their
individual circumstances. This information is shared with staff working in and
from the school / campus. These procedures should be reviewed annually and
should include provision for:
 Contacting parents or named emergency contacts
 School transport arrangements
 School meal arrangements
 Other school users
5.72 Emergency closure information is relayed to pupils/ parents/ carers via the
usual school communication channels. In addition, school closure information
is provided to the Customer Service Centre and also the Council’s
Communication team to allow the Council website and social media sites to
be updated accordingly. Every effort is made to issue communications as
early as possible to alert parents/ carers to a school/campus closure.
5.73 The existing arrangements for Education and Learning services already
include cover for year-round severe weather and other civil contingency
incidents. No further changes are therefore required for the purposes of this
report.
Customer Service
Responsibilities
5.74 In the event of a severe weather event residents may wish to contact the
Council about any of the service areas listed above, including outwith normal
working hours.
Existing approach – year-round
5.75 Contact arrangements for Council services are published on our website.
These include out of hours emergency contact numbers. Calls to the Council’s
main customer contact number 01738 475000 outwith normal working hours
will also hear a recorded message providing details for out of hours
emergencies.
5.76 We have a contract in place with Aberdeen City Council remains in place for
all of the Service’s out of hours arrangements (Saturdays, Sundays and 5pm
to 8.45am Monday – Friday). On receipt of amber and red weather warnings
for all or parts of Perth and Kinross during these times, Aberdeen City Council
are contacted to request that they stand up additional staffing to answer calls.
Proposed approach – year-round
5.77 Further improvements continue to be developed, such as the option for the
Council to add a message to the phone line to provide all callers with up-to-
date information depending on the event e.g. where rest centres have been
established or where support services can be accessed locally. This should
Page 39 of 62

Page 40

enable a faster and more efficient response to callers during a severe weather
event and hopefully result in only those callers with a real emergency
remaining on the line to talk with a call handler.
Community support
Responsibilities
5.78 As detailed in section 5.3 the Council has a responsibility as a Category One
responder to put in place arrangements to make information available to the
public about civil protection matters and maintain arrangements to warn,
inform and advise the public in the event of an emergency.
5.79 The Council has undertaken a lot of work in recent years, and with the support
of elected members, to work with local communities to build resilience to
ensure that support is available on the ground locally when a severe weather
event or other incident occurs.
5.80 Council and partner organisations officers and manual workers are not
emergency service trained and do not carry out physical rescues or crowd
control, this being a Fire/Police function. They will however support these
other organisations in their duties.
5.81 The Council also works closely with the Scottish Flood Forum. Their aim is to
reduce the impacts of flooding on individuals and communities, through
providing immediate support and by establishing a network of community
resilience groups in flood risk areas to equip communities to cope with the
impacts and threat of flooding. They are mainly funded by Scottish
Government but are also supported by small grants and donations.
Existing approach – year-round
5.82 Our Parking and Civil Contingencies Team, Community Wardens and Visitor
Management staff work with teams across the Council and partners to
prepare for, respond to and recover from emergencies, providing us with
access to a flexible resource which can be deployed to support the
responsibilities and areas of work already detailed within this report, and in
particular engaging with individuals and communities during a weather event.
5.83 The Parking and Civil Contingencies Team also leads on our approach to
working with communities to prepare for emergencies. They have worked
hard to redevelop and grow the network of Community Resilience Groups
throughout Perth and Kinross to provide local support to communities during
and after an emergency.
5.84 As of the end of July 2024 there are 53 Community Resilience Groups set up
in Perth and Kinross. These range from large formal groups with plans, bank
accounts and constitutions to agreements on contact points and sources of
local insight and updates. These groups are notified of weather forecasts and
warnings for their area and their readiness and contact arrangements
Page 40 of 62

Page 41

between them and the Parking and Civil Contingencies Team confirmed when
weather warnings are issued.
5.85 Due to the diversity of the Perth and Kinross area, no two groups are the
same, nor are the requirements in each area the same. Therefore, bespoke
arrangements and plans are required for each area, which the team supports
groups to develop. This work is supported by £200,000 of funding awarded by
SSEN to the Council in 2023 to develop and sustain community resilience,
and £150,000 in the Council’s revenue budget for 2024/25 to further develop
and support this work.
5.86 Progress to date has included support to Perth Community Flood Aid to help
them access funding and the supply of sandbags. Support is currently
focussed on helping the group with the installation of sandbag stores at key
areas of risk on the Craigie Burn catchment area to support direct access
locally at times of need. Similarly Blairgowrie Community Council have been
supported with a supply of sandbags, funding, training and access to
equipment to diversify their role from predominantly flooding support to year-
round resilience.  We are also making great progress with Blair Atholl CRG,
Aberfeldy CRG, Pitlochry CRG, Kenmore CRG and Mount Blair CRG
(Kirkmichael, Ballintuim, Blackwater, Bridge of Cally) with the supply of
sandbags, support with local resilience plans and grant funding applications.
The team have also met with groups in Invergowrie, Errol, Blairgowrie,
Kinross, Scone, and Alyth to discuss resident interest in resilience planning for
their areas.
5.87 The Scottish Flood Forum support with critical activities include advising
residents of Property Flood Resilient materials applicable to their situations,
provision of templates and advice for setting up community flood resilience
groups, awareness raising, mediation and training.
5.88 There is UK national interest through the British Parking Association
membership in the way Perth and Kinross Council has configured its
uniformed presence to prepare for, respond to and recover from emergencies.
5.89 The Council’s social media, website and information sent directly to local
media outlets are used in advance of and during weather events to ensure
timely and relevant information is provided to the public. This includes advice
on how to prepare for the impact of weather, updates on road conditions and
closures, and how Council services are responding.
Proposed approach – year-round
5.90 All CRGs and stakeholders will be invited to a series of roadshows, with an
online version for those unable to attend in-person. These are being planned
for October.
5.91 Access to emergency response assets, including transport, has been
identified in communities as a potential area of improvement. Creating an
Page 41 of 62

Page 42

inventory of response assets, including those which can be available from
different owners, will support faster responses to issues in local communities.
5.92 As referenced elsewhere in this report managing public expectations is an
important part of our work in this area. To make best use of our resources and
ensure that these can be used where they are most needed additional work is
being undertaken to ensure that we are providing proactive information and
advice to residents on how they can protect their own properties from severe
weather events. This includes preparing their own sandbags. The Council will
continue to work with local community groups to support this work and to help
with supplying sandbags at flood susceptible locations in advance in
preparation for local distribution and use.
Flood Risk Management
Responsibilities
5.93 The Council has strategic responsibilities through the Flood Risk Management
(Scotland) Act 2009 to develop and contribute to relevant Flood Risk
Management Strategies/Plans and Local Flood Risk Management Plans.
5.94 Under the above legislation, the Council also has a responsibility to manage,
maintain and operate formal flood protection schemes. The Council also
commissions Flood Studies to properly assess flood risk, prior to developing
flood protection schemes and undertakes surface water management plans
and coastal change adaptation planning.
Existing approach – year-round
5.95 The Council’s Flooding Team has a primarily strategic role including providing
advice/ awareness raising; commissioning flood studies and flood protection
schemes; providing subject matter expertise as non-statutory consultees in
the planning process and providing advice to other Council services.
Proposed approach – year-round
5.96 A closer working relationship with other teams is vital to provide the Flooding
Team with sufficient supporting information to develop Flood Studies and
Flood Schemes. It is also an opportunity to revisit existing procedures and
work practices with partner agencies including Scottish Water, SEPA, Scottish
Flood Forum and others (see later in paper for detail). The aim being to
ensure that new flood locations identified can be characterised appropriately
for inclusion in updates to Local Flood Risk Management Plan cycles.
Discussions to satisfy this need have commenced and will continue.
5.97 A minor restructure within the team has been undertaken to allow the Flooding
Team to undertake engagement activities and data collection across the
calendar year instead of just the summer months as has been the case in
recent years. There will also be the opportunity to assist on Flood Protection
Scheme development by monitoring the local watercourses.
Page 42 of 62

Page 43

5.98 New tools are being developed to improve efficiency of existing resources and
introduce consistency of response to enquiries. This includes use of Microsoft
PowerAutomate and PowerBI to dynamically respond to enquiries and provide
initial responses in a timely manner. Improvements are also being made to
streamline the process of providing advice in Development Control (planning
consultation responses) to increase the capacity of the Flooding Team to
engage with communities at risk of flooding.
5.99 Additional projects will be considered based on experiences of other Local
Authorities, specifically focussed on property level resilience.
5.100 Input is being provided by the Flooding Team to the next iteration of the Local
Development Plan (LDP3) and also the Scottish Government Flood Resilience
Strategy consultation. These areas of work will allow the transfer of real-world
experiences of Council officers and communities into new legislation/
guidance to assist in protecting existing communities and reduce the
introduction of new developments to the risk of flooding.
6. CONCLUSION
6.1 Against a backdrop of changing weather patterns it is important that the
Council continues to ensure that we are prepared to respond at any time of
the year and out of hours to the impact that this has on our communities and
infrastructure.
6.2 Working with communities to ensure that there is local resilience in place so
that Council resources can be targeted at those most in need is an important
part of mitigating for the impact of these changes.
6.3 Council officers will continue to work together and with partners and residents
to take a risk-based approach and focus resources on managing/ operating
community scale infrastructure/flood schemes. This may include reassessing
working hour resource scheduling to account for potential subsequent
emergencies.
6.4 Additional information will be provided on the website and existing information
updated to advise communities of the level of assistance to expect in
accordance with the proposed approaches detailed in this report.
Page 43 of 62

Page 44

Authors
Name Designation Contact Details
Stuart D’All Road Maintenance
Partnership Manager
Dr Rick Haynes Flooding Manager
(01738) 475000
comcommitteereports@pkc.gov.uk
Approved
Name Designation Date
Fraser Crofts Strategic Lead – Environment
and Infrastructure
14 August 2024
APPENDICES
 Appendix 1 – Civil Contingencies Act responders
 Appendix 2 -  Partner agencies
 Appendix 3 -  Flooding contingency systems
 Appendix 4 – Alignment with extreme weather events review improvement
plan
 Appendix 5 – Council response examples – RMP
 Appendix 6 – Council response examples – Flooding
Page 44 of 62

Page 45

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND COMMUNICATION
Strategic & Resource Implications Yes / None
Community Plan / Single Outcome Agreement Yes
Corporate Plan Yes
Resource Implications
Financial None
Workforce None
Asset Management (land, property, IST) None
Assessments
Equality Impact Assessment None
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) Yes
Legal and Governance None
Risk Yes
Consultation
Internal Yes
External Yes
Communication
Communications Plan Yes
1. Strategic Implications
Community Plan / Single Outcome Agreement
1.1 The Council’s response to severe weather is provided to ensure that transport
links and Council services essential to economic and social activity can
continue to be used safely during severe weather. It will also ensure the
Council as Roads Authority complies with its statutory duty as set out in
Section 34 of the Roads (Scotland) Act 1984. However, it is not the intention
and is not possible to keep all roads and services free from the impact of
severe weather at all times.
1.2 The Council will operate a system of severe weather response which will, as
far as reasonably practicable, permit the safe movement of vehicular and
pedestrian traffic on the more important parts of the road and footway
network, taking into account the finance which has been made available.
1.3 Similarly the activities outlined in other weather related/OOH events are to
mitigate risk and damage to personal property. This is the individual’s
responsibility but Council officers will assist where it has the expertise and
resource available whilst not taking on responsibility (financial or legal liability)
for others’ assets.
Page 45 of 62

Page 46

Corporate Plan
1.4 The Council’s Corporate Plan 2022/23-2027/28 sets out our vision for a Perth
and Kinross where everyone can live life well, free from poverty and
inequality. This report contributes to the following priorities within that Plan
 Tackling climate change and supporting sustainable places
 Protecting and caring for our most vulnerable people
 Working in partnership with communities
2. Resource Implications
Financial
2.1 The recommendations in this report will be managed through existing agreed
budgets.
2.2 The Council have this year set a budget for £4.245m for reacting to weather
events in 2024–25 and this report is brought to committee to advise of
preparations/arrangements for the such scenarios. It is recognised that in
these fiscally challenging times the Council financial position may change
requiring a subsequent alteration in the levels of service delivery to match the
available budget.
2.3 The actual expenditure on the Winter Service and other events will be
dependent upon the severity of the weather throughout the winter and other
emergencies throughout the year and will be closely monitored by the service
and reported to the relevant committee(s) as required.
Workforce
2.4 The recommendations in this report have no direct additional implications for
the workforce however the enhanced use of existing teams across the Council
form part of the improvements to the Council’s emergency response and
resilience arrangements.
3. Assessments
Equality Impact Assessment
3.1 Under the Equality Act 2010 the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties.
As this report makes no changes to existing Council policies it has been
assessed as not relevant for the purposes of EqIA.
Page 46 of 62

Page 47

Strategic Environmental Assessment
3.2 Strategic Environmental Assessment (SEA) is a legal requirement under the
Environmental Assessment (Scotland) Act 2005 that applies to all qualifying
plans, programmes and strategies, including policies (PPS).
3.3 The matters presented in this report were considered under the Environmental
Assessment (Scotland) Act 2005 and pre-screening has identified that the
PPS will have no or minimal environmental effects.
Sustainability
3.4 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. In terms of the Climate Change Act,
the Council has a general duty to demonstrate its commitment to sustainability
and the community, environmental and economic impacts of its actions.
3.5 This report sets out how the Council is responding to the challenge of
mitigating the impact of climate change by highlighting the measures put in
place to respond to severe weather events all year round.
Risk
3.6 The Council as Roads Authority have a statutory duty as set out in Section 34
of the Roads (Scotland) Act 1984 which states: “A roads authority shall take
such steps as they consider reasonable to prevent snow and ice endangering
the safe passage of pedestrians and vehicles over public roads.”
3.7 This reports sets out how the Council meets its statutory obligations and
minimise exposure to risk by providing the most effective winter maintenance
service it can within the constraints of its finite resources. During severe
weather, the Council will endeavour to keep delays to a reasonable minimum.
3.8 The Council has strategic responsibilities through the Flood Risk Management
(Scotland) Act 2009 to develop and contribute to relevant Flood Risk
Management Strategies/Plans and Local Flood Risk Management Plans, and
to manage, maintain and operate formal flood protection schemes.
3.9 This report sets out how in meeting those statutory obligations the Council
contributes to preparedness and responses to severe weather events.
Page 47 of 62

Page 48

4. Consultation
Internal
4.1 Elected members are aware of and support the action plan and updates
presented to Scrutiny and Performance Committee in respect to dealing with
severe weather events, particularly flooding. For all weather events resources
are finite and impacts may be spread across Perth and Kinross, and so
officers will have to triage and react as quickly as possible. The Council do not
have 24/7 shifts as emergency services do and so reaction times will aways
be slower and require reporting to workplaces in advance of supporting
communities/ acting on requests for assistance. 
5. Communication
5.1 Communication will take place in due course.
5.2 Detail on gritting routes and times will be made available on the Council
website and ongoing winter action and road conditions will be made available
via Council, website, Facebook and X (formerly Twitter).
5.3 Notification of flood gate closures will be made via X (formerly Twitter) and
Facebook, pending the text messaging system being developed.
5.4 Information and advice on preparing for and managing the impacts of other
severe weather events, including partner information, will also be shared
through these channels as appropriate.
2. BACKGROUND PAPERS
2.1 Well Managed Highway Infrastructure 2016
2.4 Road (Scotland) Act 1984
2.5 Flood Risk Management (Scotland) Act 2009
Page 48 of 62

Page 49

PKC - GENERAL
Appendix 1
CIVIL CONTINGENCIES ACT 2004
The Civil Contingencies Act 2004 sets out the responsibilities of a variety of
organisations as Category 1 and 2 responders. These are listed below for the Perth
and Kinross Council area.
Category Group Entity
Local Authorities Perth and Kinross Council
Chief Constable of Police Scotland
Scottish Fire and RescueEmergency Services
Scottish Ambulance Service
Health NHS Tayside
Integration Authorities
1
Miscellaneous SEPA
Scottish Power / SSEN
SGNUtilities
Scottish Water
Network Rail
ScotRail
Airport Operators Transport
Harbour Authority
Common Service Agency
2
Health Public Health Scotland
6
Page 49 of 62

Page 50

Page 50 of 62

Page 51

PKC - GENERAL Appendix 2
More information on partner agencies
SEPA
1.1 SEPA are the ‘warn and inform’ agency for Scotland in terms of providing the
Scottish Flood Forecasting Service (in partnership with the Met Office). This
uses a network of over 250 rainfall, river and coastal monitoring stations
across Scotland to generate data 24 hours a day. When this data is combined
with meteorological data from the Met Office, it is used to produce the
predictions of river, coastal and surface water flooding.
1.2 These predictions are communicated to the Council and other organisations
via the national flood guidance statement, and ultimately via the Flood Alerts,
Warnings and Severe Warnings to specific areas. They also provide localised
versions to emails, telephone and mobiles for those people who have signed
up to receive these via Floodline.
1.3 SEPA’s Flood Warning Development Framework 2022-28 sets out how they
intend to maintain and improve the flood warning service over this period. For
Perth and Kinross Council area this includes:
 Improvements to the Firth of Forth and Tay (FOFAT) flood warning
scheme.
 Extensions to the existing flood warning services on the River Tay, the
River Earn.
1.4 More detail about how flow and tide data provided by SEPA is used during a
flooding incident can be found in the ‘roads and footways network’ section of
the main report.
The Met Office
1.5 As noted above, SEPA operate in partnership with the Met Office to produce
the flood forecasts for Scotland. The Met Office are specifically responsible for
the collection, interpretation and dissemination of meteorological information.
1.6 In parallel to weather forecasts, the MetOffice produce weather warnings and
provide advice over potential impacts and travel disruption. They are also
responsible for the naming of storms to allow consistent public messaging on
storm events.
1.7 The Met Office started naming storms in 2015 and issue a list of names for
the coming season each September. The list runs from early September to
late August the following year to coincide with the start of autumn and the end
of summer when there is an increased likelihood of low-pressure weather
systems. In the UK a storm will be named when it has the potential to cause
disruption or damage which could result in an amber or red weather warning.
This is based on our National Severe Weather Warnings service, which is a
combination of both the impact the weather may have, and the likelihood of
those impacts occurring. Storms will usually be named based on the impacts
from strong winds, but the impacts of other weather types will also be
considered. For example, rain, if its impact could lead to flooding as advised
by the Environment Agency, SEPA and Natural Resources Wales flood
6
Page 51 of 62

Page 52

PKC - GENERAL
warnings, or snow. Therefore 'storm systems' could be named based on
impacts from the wind but also include the impacts of rain and snow.
1.8 The storm list and impacts on Perth and Kinross for 2023-24 are noted in
Table 1 – Named Storms.
Table 1 – Named Storms
Name Period Weather
Event
Impact on Perth and Kinross
Council
Agnes 27-28 September
2023
Wind and
rain
Minimal
Babet 18-21 October
2023
Rain Invergowrie flooded and other
localised impacts
Ciaran 1-2 November
2023
Wind and
rain
Did not cover Perth and Kinross
Council area
Debi 13 November 2023 Wind and
rain
Did not cover Perth and Kinross
Council area
Elin 9 December 2023 Wind and
rain
Did not cover Perth and Kinross
Council area
Fergus 10 December 2023 Wind and
rain
Did not cover Perth and Kinross
Council area
Gerrit 27-28 December
2023
Rain Flooding of basements in Rose
Terrace, Perth. Sporadic flooding
elsewhere
Henk 2 January 2024 Wind and
rain
Did not cover Perth and Kinross
Council area
Isha 21-22 January
2024
Wind and
rain
Minimal – sporadic trees down
Jocelyn 23-24 January
2024
Wind and
rain
Widespread trees brought down
Kathleen 6-7 April 2024 Wind Sporadic trees down
1.9 Met Office named storms and colour coded weather warnings are issued and
since October 2023, 72 yellow weather warnings, 6 amber weather warnings
and 2 red weather warnings have been issued. One red weather warning
coincided with storm Babet when Invergowrie and other settlements suffered
flooding, however weather warnings do not always coincide with a named
storm. An example of this is the weekend of 7 October 2023 when no named
storm was issued but parts of Perth and Kinross suffered extensive flooding
with an amber warning.
1.10 The Met Office are continuing to develop new approaches to weather
forecasting and forecasting of the impacts from weather. Outputs from this
research is likely to be incorporated into procedures used in Scotland through
collaboration and discussion with the national resilience partnerships
previously detailed.
Page 52 of 62

Page 53

PKC - GENERAL Appendix 3
Flooding Contingency Systems
WL - Watergate System
Boxwall System
6
Page 53 of 62

Page 54

Page 54 of 62

Page 55

PKC - GENERAL
Appendix 4
Alignment with Extreme Weather Events Review – Improvement Plan (Report 24/175)
Improvement area Activity Paragraph reference in Year-Round
Weather Event Response Report
Moving from traditional focus on winter weather /
snow preparations to recognising that severe
weather is increasingly seen through heavy rainfall
and flooding throughout the year.
4.8/ 4.9/ 5.17/ 5.18/ 5.27/ 5.28/ 5.32/ 5.34/ 5.43
-5.46
Working with partners to ensure Perth Flood
Scheme Gate Closure Operational Plan reflects
recent experience of weather patterns and updates
to sources of information.
5.34/ 5.38/ 5.39Notifications and
preparedness
Building capacity in managing/ responding to future
incidents.
5.1/ 5.37/ 5.39
Continue to work with Community Resilience
Groups to build on and grow the positive impact of
local preparation and response during an incident.
4.10/ 5.58/ 5.78-5.92
Ensure appropriate mechanisms in place for public
reporting out of hours during severe weather.
5.75-5.77
Response
6
Page 55 of 62

Page 56

PKC - GENERAL
Develop a protocol to share vulnerable people lists
during emergencies.
5.57/ 5.62/ 5.64-5.65
Impact and
Recovery
Ensure appropriate welfare response and
engagement with people directly impacted during
and following a severe weather incident.
5.53-5.56
Page 56 of 62

Page 57

PKC - GENERAL
Appendix 5
Council Response Examples – Roads Maintenance Partnership
The following is the type of action officers may take when presented by different scenarios. All situations require a dynamic
assessment and in consultation with emergency services additional assistance may be provided. Priority will be given to protecting
personal safety and working within skillset and competencies.
Incident Responsible Authority Action Council will take Action Council will not take
Potholes Council Road Maintenance
Partnership (RMP)
Investigate and carry out
appropriate make safe repair (incl
signs/barrier)
Fallen or dangerous
lighting column
Council Street Lighting
Partnership (SLP)
Investigate and carry out
appropriate make safe repair (incl
signs/barrier)
Call out SSE to effect cable
repairs
Fallen or dangerous
BT/Electricity pole Utility Company
Investigate and erect signs/barrier
– if utility not contactable / won’t
attend
Actual works to the asset
Standing water in the
road
Council Road Maintenance
Partnership (RMP)
If considered a risk to travelling
public sign the danger – however
in a flood event this may not be
practicable
Call out gully motor – unless risk
to property that can reasonably
be prevented.
Dangerous buildings Building owner / Police / Fire
Assist primary authority –
signs/barriers/road
closure/diversion
Call out structural engineer or
other assessor
Fallen trees
Landowner (incl adjacent
owner to road) or Council if on
Council land
Attend and remove/make safe or
contact landowner if known. In
strong winds (>40mph) officer/
road worker will only attend with
emergency service
Cut trees in the dark unless in
presence of emergency services.
Attend/place signs/call tree
cutting company in strong winds.
6
Page 57 of 62

Page 58

PKC - GENERAL
Damaged bus shelter Public Transport Unit or
shelter owner
Make safe with barriers/tape and
remove dangerous glass
Fire in premises
adjacent to public
open space
Fire Service / Owner
Set up barriers/ signage/ closure
as requested by emergency
service
Secure/barrier a burnt building
Road Traffic Collisions
- diversions/ clean up Police
Set up barriers/ signage/ closure
as requested by emergency
service. Clean up locus of debris
prior to re-opening
Become involved in removing
body parts, clearing blood,
assessing causation
Missing utility covers Utility (SW/BT/SSE/
broadband provider etc)
Attend and make safe by placing
cone/barrier then report to utility
company the following work day
Repair/ fix the cover
Widespread power/
comms outages Power/ comms company Welfare checks Repair asset
Page 58 of 62

Page 59

PKC - GENERAL
Appendix 6
Council Response Examples - Flooding
Issue Responsible
Authority
Action Council will take Action Council will not
take
MET Office Amber or
red rain warning
Council Road
Maintenance
Partnership (RMP)
 Consider area affected and check
potential known impact locations
 Consider pre-placing sandbags in key
sites
 Consider early closing of flood gates
and notify Comms
 Check/clear trash screens
 Check with SW that pumps are working
 Request additional call handling
capacity from ACC
 Consider enhancing OOH standby
provision
 Give other teams/ SLT/ FRG advance
notice and request potential assistance
 Ensure FEWS river data available to
standby personnel
SEPA Warning Council Road
Maintenance
Partnership (RMP)
As above PLUS
 Check data for River Tay and discuss
with SEPA
6
Page 59 of 62

Page 60

PKC - GENERAL
 Commence closure of flood gates as
determined by PFAS operational
manual
Flooded Road Council Road
Maintenance
Partnership (RMP)
 Deploy personnel as soon as possible
with sandbags for use on public road/
footway
 Erect signs closing road if not a
widespread event
 Triage if a widespread event
 Send gully motor if available
 Deploy pumps if appropriate
 Replace blown manholes
 Deploy Civil Contingency and Housing
officers to adjacent property for welfare
checks
 Attend to any
sewage related
issues
Property at imminent
risk of flooding
Property owner  Triage calls
 Direct to FRG
Property Flooded Property owner  Provide sandbags to mitigate further
effects – where resources permit
 Carry out welfare checks if numerous
properties affected
 Direct to FRG
 Set up rest centre if numerous
properties affected
 Attend to any
sewage related
issues
 Pump out property
Page 60 of 62

Page 61

PKC - GENERAL
Sewerage systems
surcharging
Scottish Water  Call SW
 If no other impacts provide assistance to
SW
 Replace blown manhole covers in public
areas
 Attempt to clear or
divert sewage
Water runoff from
private land
Private landowner  Where resources permit, try to prevent
flow or protect from flow
 After event speak with landowner to
advise of obligations to manage flow
 During watercourse inspections officers
may speak with landowners to assist in
addressing flooding from their land
 Carry out works in
private land to
mitigate flooding
Landslide onto road Council Road
Maintenance
Partnership (RMP)
 Erect closure
 Notify comms
 Arrange for contractors when safe to do
so
 Remove material
during the flood
event
Damaged Road Bridge
/ Large Road retaining
Wall
Council Structures
team
 Erect closure
 Notify comms
 Inspect bridge when safe to do so
 Effect temporary make safe repairs
 Inspect at appropriate intervals
 Initiate permanent repairs
Page 61 of 62

Page 62

PKC - GENERAL
Damaged building Building owner  Erect road closure
 Assist Emergency services as
requested
 Secure property
 Call out structural
engineer or other
assessor