Democracy Spraffa

Agenda Document Pack - Climate Change and Sustainability Committee - 27/11/2023

Perth and Kinross Council · 27 November 2023
Back to Climate Change and Sustainability Committee — 27 November 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Securing the future… • Improving services 
• Enhancing quality of life • Making the best use of public
resources 
Council Building
2 High Street
Perth
PH1 5PH 
21/11/2023 
A hybrid meeting of the Climate Change and Sustainability Committee will be
held in the Council Chamber on Monday, 27 November 2023 at 09:30. 
If you have any queries please contact Committee Services on (01738) 475000 or
email Committee@pkc.gov.uk. 
THOMAS GLEN
Chief Executive 
Those attending the meeting are requested to ensure that all notifications are
silent on their device and other devices are in silent mode. 
Please note that the meeting will be broadcast online and recorded.  The
recording will be publicly available on the Council’s website following the
meeting. 
Members:
Councillor Richard Watters  (Convener)
Councillor Liz Barrett  (Vice-Convener)
Councillor Hugh Anderson
Councillor Dave Cuthbert
Councillor Angus Forbes
Councillor David Illingworth
Councillor Noah Khogali
Councillor Grant Laing
Councillor Tom McEwan
Councillor Grant Stewart
Councillor Jack Welch
Page 1 of 248

Page 2

Page 2 of 248

Page 3

Climate Change and Sustainability Committee 
Monday, 27 November 2023 
AGENDA 
MEMBERS ARE REMINDED OF THEIR OBLIGATION TO DECLARE ANY
FINANCIAL OR NON-FINANCIAL INTEREST WHICH THEY MAY HAVE IN ANY
ITEM ON THIS AGENDA IN ACCORDANCE WITH THE COUNCILLORS’ CODE
OF CONDUCT. 
1 WELCOME AND APOLOGIES   
2 DECLARATIONS OF INTEREST   
3 MINUTE OF MEETING OF CLIMATE CHANGE AND
SUSTAINABILITY COMMITTEE OF 23 AUGUST 2023 FOR
APPROVAL
(copy herewith) 
5 - 8 
4 STATUTORY BIODIVERSITY DUTY : REPORT ON DELIVERY -
JANUARY 2021 TO DECEMBER 2023
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 23/238) 
9 - 58 
5 PUBLIC BODIES CLIMATE CHANGE DUTIES REPORTING 2023
- CARBON EMISSIONS
Report by Executive Director (Communities) (copy herewith 23/329) 
59 - 68 
6 LOCAL HEAT AND ENERGY EFFICIENCY STRATEGY 2024-
2045
Report by Strategic Lead - Economy, Development and Planning
(copy herewith 23/330) 
69 - 204 
7 CRAIGIE BURN FLOOD STUDY
Report by Head of Environmental and Consumer Service (copy
herewith 23/331) 
205 - 226 
8 SOUTH KINROSS FLOOD PROTECTION SCHEME
Report by Head of Environmental and Consumer Service (copy
herewith 23/332) 
227 - 248 
Page 3 of 248

Page 4

Page 4 of 248

Page 5

CLIMATE CHANGE AND SUSTAINABILITY COMMITTEE 
Minute of hybrid meeting of the Climate Change and Sustainability Committee held
in the Council Chambers on 23 August 2023 at 9.30am. 
Present: Councillors R Watters, L Barrett, H Anderson, D Cuthbert, J Duff
(substituting for Councillor N Khogali), A Forbes, D Illingworth, G Laing, T McEwan,
G Stewart and J Welch; and Mr R Oram. 
In Attendance: B Renton, Executive Director (Communities), M Butterworth, A Clegg,
L Cassidy, D Grant, S McCann and H Wilson (all Communities); S Hendry, K Molley,
A Taylor, A Brown and M Pasternak (all Corporate and Democratic Services). 
Apologies: Councillor N Khogali. 
Councillor R Watters, Convener, Presiding. 
The Convener led the discussion on Items 1-5, with Vice-Convener L Barrett on Item
7. 
1. WELCOME AND APOLOGIES 
Councillor R Watters welcomed everyone to the meeting and an apology was
noted above. 
2. DECLARATIONS OF INTEREST 
There were no Declarations of Interest made in terms of the Councillors’ Code
of Conduct. 
3. MINUTE OF MEETING OF CLIMATE CHANGE AND SUSTAINABILITY
COMMITTEE OF 31 MAY 2023 
The minute of meeting of Climate Change and Sustainability Committee of 31
May 2023 was submitted and approved as correct record. 
4. CARSIE GREEN, BLAIRGOWRIE REWILDING OBJECTON – PETITION 
In line with the Perth and Kinross Council Petition Procedure a petition titled
‘Carsie Green Rewilding Objection’ (23/221) was submitted for consideration along
with an Officers Briefing Note in response to the Committee (23/222). 
The Lead Petitioner declined the invitation to attend and address the
Committee.  Councillor B Brawn, as a local ward member, addressed the Committee
and answered Members’ questions. 
THERE FOLLOWED A SHORT RECESS AND THE MEETING RECONVENED AT
11.03AM. 
Motion (Councillor R Watters and L Barrett)
3
Page 5 of 248

Page 6

(i) That we note the Petition
(ii) That we continue with the current “Managing Grassland areas for Climate
Change and Biodiversity” approach, which as I said, was unanimously
agreed on 31 May 2023 by this Committee; and
(iii) To ask Officers to continue to engage with local stakeholders, including
the local elected members to develop a sustainable way forward at Carsie. 
Amendment (Councillor A Forbes and H Anderson) 
This Committee recognises the importance of achieving our climate change
objectives and acknowledges that the “Managed Grass Areas for Climate Change
and Biodiversity” policy forms a part of that process. 
The report to this Committee on 31 May 2023 (report 23/167 refers) agreed
that the proposed plan would be developed in consultation with community groups
and residents for approval by this committee at a future meeting. 
It is apparent that the selection of Carsie Green as a Managed Grass Area
does not have the support of local residents and that, in accordance with the
consultation processes agreed on 31 May 2023 and our proposed community
engagement strategy, the area should revert back to the previous cutting regime
while the public consultation on Carsie Green or a suitable alternative area for
inclusion within the Managed Grass Area plan is conducted. 
In terms of Standing Order 21.1 a roll call vote was taken. 
7 Members voted for the Motion as follows:
Councillors L Barrett, D Cuthbert, G Laing, T McEwan, G Stewart, R Watters
and J Welch. 
4 Members voted for the Amendment as follows:
Councillors H Anderson, J Duff, A Forbes and D Illingworth. 
Resolved: 
In accordance with the Motion. 
5. PRESENTATION – LOCAL HEAT & ENERGY EFFICIENCY STRATEGIES
(LHEES) 
D Grant, Climate Change and Sustainable Development Team Leader
provided a slide-based presentation on the Perth and Kinross Local Heat and Energy
Efficiency Strategy (LHEES) and Delivery Plan (2024-29) Progress Update. 
D Grant answered members’ questions thereon. 
6. PRESENTATION – SMART LOCAL ENERGY SYSTEMS 
It was agreed to defer this item to the next meeting of the Committee. 
Page 6 of 248

Page 7

7. NATURE RESTORATION FUND 2022-23 
There was submitted a report by the Head of Planning and Development
(23/220) (1) providing an update on the Nature Restoration Fund allocation received
by Perth and Kinross Council for 2022/23 and 2023/24; and (2) setting out the
proposed revised process to use the funds in the current financial year. 
Resolved:
(i) The proposed revised process to allocate Nature Restoration Fund funding,
be approved.
(ii) The delegation of authority to approve community led projects to the
Executive Director (Communities), be approved. 
~~~~~~~~~~~
Page 7 of 248

Page 8

Page 8 of 248

Page 9

Perth And Kinross Council 
Climate Change And Sustainability Committee 
27 November 2023 
STATUTORY BIODIVERSITY DUTY: 
REPORT ON DELIVERY - JANUARY 2021 TO DECEMBER 2023 
Report by Strategic Lead – Economy, Development and Planning
(Report No. 23/328) 
1. PURPOSE 
1.1 Under the Nature Conservation (Scotland) Act 2004, all public bodies in
Scotland have a duty to further the conservation of biodiversity when carrying
out their functions. The Wildlife and Natural Environment (Scotland) Act 2011
further requires all public bodies to report every three years on how they
comply with this duty. This is the third report, covering the period from 1
January 2021 to 31 December 2023 demonstrating how Perth and Kinross
Council has performed regarding the biodiversity duty for this three-year
period. 
1.2 The report includes actions undertaken by PKC to: 
• protect and enhance biodiversity
• mainstream nature-based solutions, climate change and biodiversity
throughout the organisation
• engage with the public and develop the workforce
• monitor actions undertaken and conduct/commission research, and
• draw attention to main achievements for biodiversity over the last three
years and look ahead to potential challenges. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
• notes the significant positive work undertaken over the period 2021-2023
• approves the Biodiversity Duty Report (Appendix A) to be uploaded to the
PKC website and sent to the Scottish Government prior to the 31 December
2023 deadline.
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues
• Section 5: Summary
• Section 6: Conclusion
• Appendix A: Biodiversity Duty Report
4
Page 9 of 248

Page 10

4. BACKGROUND / MAIN ISSUES 
4.1 The Council has a statutory duty to protect and enhance biodiversity when
carrying out their functions. All public bodies must report to Scottish
Government every three years on how they comply with this duty. This report
covers the period 1 January 2021 to 31 December 2023, demonstrating how
Perth and Kinross Council has performed regarding the biodiversity duty. 
5. SUMMARY 
5.1 The purpose of this report is to summarise some of the Council’s successes in
delivering the statutory biodiversity duty and to submit the report to the
Scottish Government in line with guidance provided by NatureScot. Compared
to the last report in 2020, the guidance for the production of this report
requests more details on successes, challenges encountered and more
explanation of ongoing or proposed monitoring of activities undertaken for
biodiversity. More details on research and monitoring in relation to nature-
based solutions, climate change and biodiversity are also requested. 
5.2 There has been significant positive actions taken both by the Council directly,
and by communities with support from the Council. These have led to positive
progress in addressing the Biodiversity emergency across Perth and Kinross. 
Key highlights identified in the report include: 
1. receiving over £700k of Scottish Government Nature Restoration Fund
from 2021 that has enabled more than 30 projects to be successfully
delivered by the Council and community groups, with a further 18 on-going
in 2023/24. This has supported and empowered local communities to carry
out their own projects to enhance nature and increase nature
connectedness.
2. developing a new approach to grassland management across
greenspaces. 
3. developing and adopting the Planning for Nature Supplementary Guidance
to set clear expectations and requirements for planning applications
regarding information on biodiversity. 
4. mainstreaming of biodiversity throughout the organisation – for example,
the new Protecting Swifts in Conservation Buildings working group set up
in 2023, where the Council is working in partnership with the Perth &
Kinross Heritage Trust in considering swifts in the heritage funded
conservation projects.
5. building a successful partnership with the Scottish Invasive Species
Initiative and local landowners to deliver a catchment scale approach to
Invasive non-native species (INNS) control project on the River Almond. 
6. creating the new Climate Action website and social media channels to
raise awareness of actions to tackle the twin emergencies of climate
change and nature loss.
7. developing our Biodiversity Towns and Villages programme, with
Blairgowrie & Rattray named as Scotland’s first Biodiversity Town. 
8. supporting partnership to tackle landscape scale challenges with the
Perthshire Nature Connections Partnership and Conservation Officer post.
Page 10 of 248

Page 11

9. increasing our biodiversity workforce, through the budget process, with the
establishment of the Climate Change Officer into Community Greenspace
and creation of a new Climate Change Land Restoration Officer to further
landscape scale restoration and upskilling our existing workforce. 
10. growing the membership of PKC staff Biodiversity Ambassadors. 
5.3 NatureScot provides guidance on the contents of the Biodiversity Duty Report
and requests the inclusion of main challenges for the next three years. The
challenges identified by various public bodies are collated and analysed by
NatureScot and Scottish Government to identify commonalities. This can then
be used to prioritise funding or create stronger policy and guidance for public
bodies.  The attached report set out the main challenges for improving
biodiversity over the next three years and includes: 
1. the Council has increased its biodiversity resources over the last three
years, reflecting the increased need to incorporate greater levels of
biodiversity enhancement into planning decisions and operational
enhancements. However, more work needs to be undertaken to: 
a. implement NPF4 requirements and follow-ups in future Local
Development Plan and creation of nature networks across Perth
and Kinross;
b. provide long term management plans and tree planting plans for
Council’s owned and maintained land;
c. undertake long-term biodiversity monitoring of projects. 
2. a more sustainable approach to the NRF funding and consistency of
themes to produce more effective results 
3. Tayside does not have a local biodiversity records centre which is a
challenge for the Council as biodiversity data is held in several different
locations rather than one centralised database. A records centre would
also aid development management and land use decisions as well as
creation of nature networks. A new Scottish Government funded project
called Better Biodiversity Data is analysing records centres across
Scotland, as well as looking at solutions to ensure better storage and
interpretation of biological records. PKC is a partner of the project. 
4. While the Council has its Local Biodiversity Action Plan (LBAP), further
consideration needs to be given to the development of long-term Council’s
specific biodiversity and greenspace strategies and policies.  These
collectively would support co-ordination of delivery, prioritisation, and
securing necessary resources for biodiversity enhancements on Council’s
owned land to deliver multiple benefits. 
5. Effective invasive non-native species (INNS) control requires a catchment-
wide long-term plan. There is not currently one for the River Tay
catchment, which is a challenge for effective management. PKC created
the new post of Climate Climate Change Land Restoration Officer in 2023.
An element of this role will be to explore the potential of PKC being a part
of a larger catchment management group. 
Page 11 of 248

Page 12

6. CONCLUSION 
6.1 Perth and Kinross Council has achieved positive outcomes for biodiversity
over the last three years with enhanced mainstreaming and prioritisation of
climate change and reducing biodiversity loss. The Council is appreciative of
the Scottish Government’s and NatureScot’s allocation of funds from the
Nature Restoration Fund to allow the Council to carry out practical activities to
restore nature. It has also given the Council the opportunity to support and
empower local communities to carry out their own projects to enhance nature
and increase nature connectedness. Local community and staff volunteers
contributed a significant amount to enhancing biodiversity across Perth and
Kinross. 
Author
Name  Designation Contact Details
Joanna Dick  Tree and Biodiversity
Officer
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
20 November 2023 
APPENDICES 
• Appendix A - Statutory Biodiversity Duty: Report on Delivery, January 2021 to
December 2023 
Page 12 of 248

Page 13

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  No
Workforce No
Asset Management (land, property, IST) No
Assessments  
Equality Impact Assessment No
Strategic Environmental Assessment No
Sustainability (community, economic, environmental) No
Legal and Governance  Yes
Risk No
Consultation 
Internal  Yes
External  No
Communication 
Communications Plan  No 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(i) Reducing Poverty (including child poverty, fuel poverty and food poverty)
(ii) Mental and physical wellbeing
(iii) Digital participation
(iv) Skills, learning and development
(v) Employability 
1.2 The report summarises the positive on-going work related to biodiversity, which
has proven mental and physical wellbeing benefits. 
Page 13 of 248

Page 14

Corporate Plan 
1.3 This report supports the objectives within the draft new Corporate Plan:- 
(i) Children and young people grow up safe, respected, well-educated,
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities
for all; 
(iii) People can achieve their best physical and mental health and have
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations. 
2. Resource Implications 
Financial 
2.1 None. 
Workforce 
2.2 None. 
Asset Management (land, property, IT) 
2.3 None. 
3. Assessments 
3.1 The Impact and Value Assessment Tool has been completed for this paper,
with the following findings: 
3.2 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
(i) Assessed as not relevant for the purposes of EqIA 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
Page 14 of 248

Page 15

3.4 However, no action is required as the Act does not apply to the matters
presented in this report.  This is because the Committee are requested to note
the contents of the report only and the Committee are not being requested to
approve, adopt or agree to an action or to set the framework for future
decisions. 
Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development.   Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.6 The paper highlights positive work, but has no direct impact. 
Legal and Governance 
3.7 Approval of Appendix A is required for the Council to fulfil its duties under the
Nature Conservation (Scotland) Act 2004. 
Risk 
3.8 Not applicable. 
4. Consultation 
Internal 
4.1 A request for feedback and contributions went out to all Service Managers in
the Council.  Key services working on biodiversity have contributed to the
report. 
External 
4.2 None. 
5. Communication 
5.1 Not applicable. 
2. BACKGROUND PAPERS 
2.1 NatureScot Biodiversity Duty Guidelines.
Page 15 of 248

Page 16

Page 16 of 248

Page 17

1 
Appendix A 
Statutory Biodiversity Duty:
Perth & Kinross Council Report on Delivery
January 2021 to December 2023 
Photo: volunteers spraying invasive non-native plants on the River Almond 
Date: 12th October 2023
Contact: Joanna Dick, Biodiversity and Tree Officer, Biodiversity@pkc.gov.uk 
4
Page 17 of 248

Page 18

2 
Contents 
1. Introduction ........................................................................................................................................ 4
2. Actions to Protect and Enhance Biodiversity ...................................................................................... 5
3. Mainstreaming Biodiversity .............................................................................................................. 21
4. Nature-Based Solutions, Climate Change and Biodiversity ............................................................... 23
5. Public Engagement and Workforce Development ............................................................................ 29
7. Biodiversity Highlights and Challenges ............................................................................................. 39
8. Conclusion ......................................................................................................................................... 41 
Page 18 of 248

Page 19

3 
List of Abbreviations
BTO British Trust for Ornithology
CCROA Climate Risk and Opportunity Assessment 
GIS  Geographical Information System 
HRA Habitat Regulations Appraisals 
IVA Impact and Value Assessment 
INNS  Invasive Non-Native Species
JHI James Hutton Institute
LBAP  Local Biodiversity Action Plan
LDP Local Development Plan
NPF4 National Planning Framework 4
NRF Nature Restoration Fund
OSQA Open Space Quality Audit 
PKCCC Perth and Kinross Climate Change Commission 
PKC Perth and Kinross Council 
PKCT Perth and Kinross Countryside Trust 
PNCP Perthshire Nature Connections Partnership 
SEPA Scottish Environment Protection Agency 
SISI Scottish Invasive Species Initiative
SRUC Scotland's Rural College 
SSSI Site of Special Scientific Interest 
SuDS Sustainable urban drainage systems
SuDSNET Sustainable Urban Drainage Systems Network
TayARG Tayside Amphibian & Reptile Group
TBP Tayside Biodiversity Partnership
TPO Tree Preservation Order 
Page 19 of 248

Page 20

4 
1. Introduction 
Under the Nature Conservation (Scotland) Act 2004, all public bodies in Scotland have a duty to further
the conservation of biodiversity when carrying out their functions. The Wildlife and Natural
Environment (Scotland) Act 2011 further requires all public bodies to report every three years on how
they comply with this duty.  This is the third report, covering the period from 1st January 2021 to 31st
December 2023 demonstrating how Perth and Kinross Council has performed regarding the
biodiversity duty for this three-year period. 
Perth and Kinross Council (PKC) has achieved much for biodiversity over the last three years with
enhanced mainstreaming and prioritisation of climate change and reducing biodiversity loss. Many
challenges remain and there are multiple opportunities to further the conservation of biodiversity in
our daily activities. Recognising the urgency of biodiversity loss and the interlinkages with climate
change, in November 2022 the Council declared a Climate and Biodiversity Emergency. 
Perth and Kinross Council is a local authority with responsibility for an area of 5,300km2 housing a
population of 150,800 people (Perth and Kinross Council, 2022). The Council is made up of 40 elected
Councillors representing 12 wards. The Council operates through a system of committees and sub-
committees with officers reporting to committees on relevant matters.
A new Corporate Plan 2022 – 27 was approved by the Council in December 2022, and sets the vision
for “a Perth and Kinross where everyone can live life well, free from poverty and inequality”. It sets out
priorities and corporate outcomes which are aligned with the Council’s values and designed to address
or mitigate the impact of the many challenges the Council and the communities across Perth and
Kinross are facing now and in the coming years. Biodiversity is aligned with one of the seven corporate
priorities ‘Tackling climate change and supporting sustainable places’.
Day to day governance concerning biodiversity from May 2022 onwards has been directly through the
Climate Change and Sustainability Committee. The committee considers matters relating to climate
change, countryside management, parks and open spaces, trees and woodlands, environmental
health, flood prevention, reservoirs, environmental assessment, sustainable development and
environmental policy, environmental protection and enhancement, and waste management.  
Prior to this, biodiversity sat with the Environment, Infrastructure and Economic Development
Committee, which has retained responsibility for many linked topics including: the built environment
(structures, roads, bridges, transportation networks, parks, recreation spaces and distribution
networks for water and energy, fleet assets), the protection of public health, urban and rural
regeneration, and economic well-being.
We are grateful to the Scottish Government and NatureScot for the allocation of funds from the Nature
Restoration Fund to allow PKC to carry out practical activities to restore nature. It has also given PKC
the opportunity to support and empower local communities to carry out their own projects to enhance
nature and increase nature connectedness. Staff Biodiversity Officers and volunteers across the
Council area have contributed a vast amount to many projects. Many challenges remain and there are
multiple opportunities to further the conservation of biodiversity in our daily activities. 
Page 20 of 248

Page 21

5 
2. Actions to Protect and Enhance Biodiversity
Perth and Kinross Council is a partner of the Tayside Biodiversity Partnership (TBP) which allows cross
border collaborative working between Perth and Kinross and Angus Councils in promoting biodiversity
through the Tayside Biodiversity Co-ordinator. We are committed to delivering the actions of the
Tayside Local Biodiversity Action Plan (LBAP) 2016-26 and supporting and working with the TBP to
safeguard our habitats and species. 
Since 2021, the TBP Co-ordinator has been employed by PKC full-time and is central to advising on
biodiversity priorities and projects in the Perth and Kinross area. The Biodiversity Co-ordinator is now
embedded wholly within PKC, working closely with the Perth and Kinross Countryside Trust allowing
greater focus on integrating actions within the local authority and working closely with local
communities. 
In 2022, PKC undertook a review of all 284 PKC actions in the Tayside Local Biodiversity Action Plan
(LBAP) allocating a traffic light system of red, amber and green to indicate progress and identify gaps.
The results are being used to prioritise project work and to guide allocation of the Nature Restoration
Fund (NRF). 
Protecting Biodiversity in Development Management
Planning applications are screened by the Tree and Biodiversity Officer for potential impacts on
biodiversity. The sustainable land use tool on Geographical Information System (GIS) highlights
ecological and biodiversity constraints and is used by Officers to inform proposals that require an
Environment Impact Assessment and/or Habitat Regulations Appraisal to ensure the Council complies
with environmental legislation and statutory requirements. This systematic approach contributes to
the Council’s biodiversity duty. 
Page 21 of 248

Page 22

6 
Year Total
number of
planning
applications
Number of planning
applications
assessed for
biodiversity
constraints
Number of planning
applications where
biodiversity advice
and
recommendations
were provided
Number of
planning
applications
approved with
biodiversity
conditions
2021 1505  352 332 151 
2022 1396  379 342 127
2023 
(to 4 October)
995  371  261 61 
Planning For Nature Guidance 
PKC developed the Planning for Nature Supplementary Guidance, which was adopted in April 2022.
This brings together the expectations and requirements for planning applications regarding
information on biodiversity. The importance of accurate ecological surveys undertaken in accordance
with best practice and carried out by suitably qualified and experienced persons is stressed as well as
the need for impact assessments and clear evidence of the mitigation hierarchy. Implementation of
the Guidance has been supported by workshops for Development Management Officers and was
highlighted at the 2023 Housebuilders Forum to raise developers’ awareness. 
Enhancing Biodiversity in Development Management
Appendix 4 of the Planning for Nature Supplementary Guidance sets out a checklist for all applications
and specific developments as well as minimum enhancement requirements. The standard biodiversity
enhancement measures set out in the Planning for Nature SG are strengthened by NPF4. All major
housing developments must include the measures below. 
Minimum Requirement  Reasoning
Hedgehog Highways to be created in fencing
via a 13x13cm gap.
Contributes to Tayside LBAP objective to
enhancing connectivity. 
Wildlife Kerbs installed adjacent to all road
gullies within 500m of a SUDS pond
Contributes to Tayside LBAP project to
mainstream use. Tayside are leading the way with
this approach.
Swift nest boxes/bricks in settlements with
swifts within 2km, at least one integrated
swift nest brick into 25% of homes over 2
stories.  
Contributes to Tayside LBAP projects Sparrows on
the Edge and the Tayside Swift Conservation
Project.
Barn owl nest boxes in rural areas  Contributes to Tayside LBAP action to provide
nesting boxes. 
House/tree sparrow nest boxes in rural areas  Contributes to Tayside LBAP Sparrows on the Edge
Project.
Bat roosting boxes/bricks/tubes in 25% of 2
storey houses
Contributes to Tayside LBAP Urban Bats Project.
Delivering NPF4 Requirements for Enhancement
Page 22 of 248

Page 23

7 
NPF4 introduced a need for Planning Authorities to require positive effects from development
including significant enhancement in major and EIA developments. As no tools or resources were
provided nationally alongside this requirement, developers in Perth and Kinross have been encouraged
to set out their enhancement following advice in the Planning for Nature SG.
Required tools and resources include:
• a metric for biodiversity net gain
• training and resources to assess such a metric
• nature network guidance and mapping tools
• methodology, guidance or established mechanism to plug into for off-site compensation and
enhancement. 
PKC is currently developing an interim guidance note to supplement the Planning for Nature guidance
to further support implementation but recognise that full implementation of NPF4 will not be possible
until the tools are developed. The potential for offsite enhancement has been considered and in
partnership with the Perth and Kinross Countryside Trust (PKCT) work has been commissioned to
explore how this could work using the Riverwoods project as a pilot study. 
Local Nature Conservation Sites 
The project to identify Local Nature Conservations Sites is well underway with over 200 local
biodiversity sites and 90 geodiversity sites initially identified. This involved a significant amount of
preparatory work. Survey work was started in 2021 by a graduate ecologist, BSBI recorders and student
volunteers. Surveying restarted in 2023 with a new graduate ecologist and a new BSBI recorder.
Surveys for both geodiversity sites and biodiversity sites are expected to be completed by summer
2024 with adoption mid-2025. Candidate sites are included on internal mapping and although not yet
designated, existing information on these sites is used to inform planning applications in accordance
with National Planning Framework 4 (NPF4) policy 3, as well as informing responses to forestry
consultations.
Tay Forest National Park Bid
In response to the Scottish Government intention to create at least one new national park, PKC agreed
to prepare a bid submission for a new national park in northern Perthshire, called the Tay Forest
National Park. The opportunity to submit a bid to create a new national park is a rare opportunity to
seek international recognition for Highland Perthshire’s outstanding natural beauty and rich cultural
and landscape diversity. Engagement with communities and stakeholders started in Autumn 2023 to
shape the bid proposals further with in-person and online events. A key aim is to ensure that the bid
submission and the vision for a national park it sets out reflects the views of the many different people
that live and work in the area. The bid is due to be reported in finalised form to the full Council prior
to submission to Scottish Government at the end of February 2024. Scottish Ministers are expected to
announce the decision in mid 2024. 
Page 23 of 248

Page 24

8 
Case Study: Protecting Swifts in Conservation Buildings 
In 2023, a new Protecting Swifts in Conservation Buildings working group was created within PKC,
highlighted in the below article from the Tayside Swifts 2023 Newsletter. The TBP Tayside Swifts Project
are a part of the working group who raise awareness of swifts and provide information on how to
improve habitats for swifts. Community Swift Conservation Projects have taken place in five Perthshire
villages. The Saving our Swifts Project was awarded a Highly Commended certificate in the 2022 Nature
of Scotland Awards run by the RSPB and NatureScot. 
Page 24 of 248

Page 25

9 
Biodiversity Enhancement in New PKC Projects 
Colleagues in PKC’s Planning and Property departments work together
to ensure biodiversity is protected and enhanced through upgrading
and new build Council projects. New buildings require biodiversity
enhancement measures in line with the Planning for Nature
Supplementary Guidance. Careful consideration regarding creating
more ecologically friendly planting beside the usual utility type spaces
that schools require has resulted in wildflower areas at the new
Riverside Primary School. Perth High School and the Riverside Primary
School will provide bat boxes on the buildings and trees and nest
boxes for house martin, swallow, swifts, and sparrows. Both school
grounds will benefit from compensatory native tree planting and
native hedgerows. 
Perth Museum
The under-construction Blairgowrie Recreation Centre will provide sparrow and swift boxes, poles with
bat boxes and native tree and hedgerow planting within the extensive landscaping. The newly
transformed Perth Museum has swift boxes above the parapet in the city centre. These measures
contribute towards many PKC actions in the Tayside Local Biodiversity Action Plan. Through the process
of good design and Planning advice and conditions, biodiversity enhancement measures will be the
norm for PKC new build and extension projects. 
Protecting Trees, Forestry and Woodland in Development Management
The Council aims to safeguard trees and woodlands through the development management process. 
Since February 2019, two posts with an enhanced tree protection remit have met weekly to review
planning applications and work with developers, landowners, and local stakeholders to ensure
woodland cover is not reduced within the Council area. The Tree Enforcement Officer assesses
requests for Tree Preservation Orders and tree works in Conservation Areas ensuring trees of amenity
and biodiversity value are protected. 
PKC are robust in requesting tree surveys and tree protection plans to inform the planning process and
projects undertaken by the Council as set out in the Planning for Nature SG. This includes survey best
practice, applying the mitigation hierarchy, how to apply the trees and woodland policy of LDP2 and
what is expected from tree and woodland surveys.  The Tree Enforcement Officer provides training to
Council colleagues and in 2023 the Woodland Trust delivered staff training to raise awareness of the
importance of veteran trees, ancient woodland, and the new requirements of NPF4. 
Protecting and Enhancing Trees, Forestry and Woodland in Land Use Change
A new dedicated woodland enquiries email address was created in 2019 to aid direct communication
with partners such as Scottish Forestry and private forestry companies. Advice is provided in line with
the Council’s Forest and Woodland Strategy to promote sustainable forest management and planting
the right type of woodland in the right place to enhance landscape and biodiversity as well as
enhancing carbon capture and storage. The Forest and Woodland Strategy is to be reviewed in
2023/24. 
Page 25 of 248

Page 26

10 
Consultation Type Number of consultations from
2021 to 2023
Felling permissions 85
Long term forestry and land management plans 48
Woodland creation proposals 67 
An annual review is held with Scottish Forestry to ensure PKC adds value to the process. In response,
we altered the process to improve communication with the Perth and Kinross Outdoor Access Forum.
PKC are working with the Perth and Kinross Countryside Trust to ensure the Council mapping system
includes species rich grassland to inform our responses to woodland creation proposals. 
In 2023 PKC responded to the Scottish Forestry grant scheme consultation highlighting the need to
support smaller landowners, to fund natural regeneration, increase the proportion of native species
and to emphasise the need for sustainable deer management and reduced deer fencing.  
Page 26 of 248

Page 27

11 
Protecting and Enhancing Trees, Forestry and Woodland on PKC Owned Land 
Case Study: Protecting Riparian Trees of Value from Beaver Damage
A new project was created in 2022 to identify trees of
value at risk from beaver damage on council-owned
land. GIS mapping data was combined with existing
beaver territory data from NatureScot to identify priority
valuable trees that should be protected from beaver
damage. 
Trees of value were identified as ancient woodland, trees
protected by a Tree Preservation Order (TPO), trees
within a Conservation Area, and trees of cultural,
aesthetic and biodiversity value. PKC Community
Greenspace staff have been working with volunteers to protect trees with fencing in several locations. 
From 2020, PKC Community Greenspace operations ceased cutting or strimming around trees in parks
and greenspaces to avoid damage to trees. The PKC Forest Plan covers 36 woodland sites in Council
ownership and management and is being updated. An Ash-Dieback Plan is in draft, and a new
management plan has been created with a further three in draft following public consultation. 
The Nature Restoration Fund was used to enhance the condition of three Sites of Special Scientific
Interest (SSSI’s) and other woodlands within PKC ownership by removing negative pressures such as
invasive non-native species and creating open ground. The Woodland Trust provided on-site advice
which has been invaluable. 
Page 27 of 248

Page 28

12 
Westbank Nursery 
PKC is fortunate to still own and operate a plant nursery with expert staff growing 26 species from local
seeds and cuttings. These will be planted in local parks and greenspaces ensuring local provenance
and genetics. This approach has the added benefits of reduced risk of bringing in pests, diseases and
invasive non-native species, along with the carbon savings associated with having trees delivered from
nurseries elsewhere. 
The Nursery offers many opportunities to deliver training and develop rural skills and community
benefits, but investment is required to realise the full potential of the site.   
Tree Planting in Parks and Greenspaces 
PKC was awarded the Queens Green Canopy City Champion status for Perth City’s Jubilee Avenue, a
row of 27 semi-mature hornbeam trees in the South Inch in Perth. The Avenue is marked by special
posts at either end commemorating the Jubilee. The status was granted to towns with create an
environmental legacy and promote the importance of urban trees and woodland to health, air, quality,
and climate. Additional trees were planted using the PKC Climate Action Fund. 
Year Number of trees planted using PKC
Climate Action fund and as part of
Queen’s Green Canopy
Ongoing maintenance planned
2021/22 1031 Trees watered and ad hoc maintenance
as required. Replaced as required.  2022/23 670
2023/24 482 
Page 28 of 248

Page 29

13 
Action for Pollinators 
In 2022, PKC conducted a review of the 18 actions under 5 objectives of the Pollinator Strategy for
Scotland 2017-2027 and the results are provided below. This led to enhanced focus on grassland
management, the B-Lines project and creating more connected habitats for pollinators. 
Protecting and Enhancing Grasslands
In response to the action in the Climate Action Plan and several requests from communities to manage
more greenspaces for biodiversity, in 2021, Community Greenspace undertook grassland management
trials encompassing two different approaches. The first involved "Managed for Wildlife” sites where
grass was mowed once annually, and the cuttings removed. The second approach focused on
designating "No Mow" areas, where the grass remained untouched. 
Year Number of
Managed for
Wildlife sites
Area of
Managed for
Wildlife
(acres)
Number of
No Mow sites
Area of No
Mow (acres)
Public
consultation
ran
2021 0 0 0 0 No
2022 7 9.03 36 53.68 Yes
2023 7 9.03 36 53.68 No 
Biodiversity monitoring was carried out in 2022 by volunteers and PKC Biodiversity Ambassadors.
Results indicated that uncut areas contained more wildflowers, more wildflowers in flower, and a
Red
28%
Amber
39%
Green
33%
PKC progress towards actions in the
Pollinator Strategy for Scotland  Legend:
No progress
Some progress
On track/good progress
Page 29 of 248

Page 30

14 
higher number of different species compared to amenity cut grass. Bees, butterflies and other insects
were more abundant in uncut grass areas than cut, see the Results and Discussion Paper for more
detailed results.  An online public consultation in 2022 returned positive results with 73.8% of 386
respondents were in favour of the proposals. 
Following these findings, the
Climate Change and
Sustainability Committee
approved proposals to develop
a long-term plan, increase the
number of sites and ensure
close collaboration between
Council officers, community
groups, and residents to shape
future plans. NRF was used to
purchase two pedestrian flails
with interchangeable flail head
and scythe attachment.
Machines will be made available
to path groups for maintaining
the core path network with the flail head and the scythe attachment for emerging meadow
management groups. 
Changes to grassland management have focused on parks and greenspaces and road verges will be
considered in future. In 2023, a positive meeting was attended by PKC, Plantlife and the Tayside
Amphibians and Reptile Group to discuss a collaborative approach to verge management for wildlife. 
Successes include collecting biodiversity data, engaging with local communities, and receiving
encouraging feedback from NatureScot and fellow Councils. Challenges include public perception,
ensuring areas have grass mown edges and paths and on-site signage.
Strathmore B-Lines Project 
The Strathmore B-Lines Project is the first B-Lines initiative in the Tayside region aiming to restore 20
hectares of wildflower-rich grasslands and other nectar-rich habitats across 20 sites to combat the
decline of pollinating insects from Dunkeld to Montrose. Run by Buglife Scotland in partnership with
Page 30 of 248

Page 31

15 
TBP, PKC and Angus Council, PKC have agreed to manage 3 sites.  In addition, a Farm Cluster near Alyth
is achieving large-scale hedging and tree planting. The TBP are assisting the community to map a
wildlife corridor from Blairgowrie up to the B-Line that runs north of the town. 
Changes to grassland management on Council owned land, the B-Lines and community projects are
providing habitat for pollinators. In partnership with NatureScot, a pollinator maze was created in the
busy greenspace Kirkgate Park on the banks of Local Leven National Nature Reserve in 2021. The Perth
Heather Garden is maintained by a group of dedicated volunteers and contains 550 varieties that are
valuable for pollinators. 
Green Graveyards
The Tayside Biodiversity Partnership assisted PKC Officers to create a guide to managing graveyards in
PKC to become Green Graveyards, a key project in the Tayside LBAP. Twenty Snowdrops for Pollinators
projects have taken place in graveyards in 2022 and will be expanded in 2023 and 2024. Homes for
Wildlife projects have also included graveyards with 20 communities. 
Case Study: Auchterarder Park Flush of Flowers 
In 2023 Community Greenspace led a £290k redesign and build of a community park play facility
in Auchterarder Park. Tree planting, wildflower seeding, and wildflower turfing were
incorporated into the design resulting in in a flush of wildflowers this summer increasing species
diversity of the site. A Birds and Bees wildflower turf contained 41 native flowers specially
selected to be pollinator friendly and a Species Rich Lawn Turf blended 12 slow growing grasses
and 23 native flowers. The creation of wildflower areas within this publicly accessible space
enables improves the visual diversity of the park, raises awareness of the range of wildflowers
and pollinators that depend on them and the many benefits to people, place, and nature. 
Page 31 of 248

Page 32

16 
Enhancing Water and Wetlands for Biodiversity 
Tayside Biodiversity Partnership Ponds for Puddocks
Using Nature Restoration Funding in 2021-22, the SuDS Ponds Project improved six ponds with the
help of local volunteers, including local schools and a commercial volunteer day. A second phase in
2022-23 saw the PKC Biodiversity Ambassadors take part in the launch event at the North Inch Pond
where there was a photocall with the Courier and an interview with BBC Radio Scotland Out of Doors. 
Phase 3 of the project from October 2023 will be the final phase to complete this suite of SuDS
ponds across Perth and Kinross. This will specifically safeguard amphibians and enhance the sites
for invertebrates, especially dragonflies. The project, collectively called Ponds for Puddocks has
been nominated in the Nature of Scotland 2023 Community Innovation Award. 
Amphibian Ladders
In conjunction with TayARG (the Tayside Amphibian & Reptile Group) gullypot surveys were
undertaken as part of the SuDS Ponds Project to detect problem areas. In 2002, 60 amphibian ladders
were made by volunteers and installed in gullypots to prevent amphibians falling in and becoming
trapped. This was replicated in 2023 with ladders being made and installed in Guildtown. More
volunteer ladder making workshops are planned for autumn 2023 in Coupar Angus and Stanley. Other
Local Authorities have been in touch requesting further information on our approach. 
Invasive Non-Native Species (INNS) Treatment
PKC are members of the Perth and Kinross INNS Working Group led by NatureScot with Scottish
Forestry, SEPA and TBP. Through the Development Management process and Planning for Nature SG,
we require INNS management plans are submitted detailing eradication plans where INNS are present
on site. As part of the largest PKC construction project, the Cross Tay Link Road, the contractor BAM
facilitated removal of INNS along the Perth Lade in September 2023. 
Case Study: New River Almond Project
Page 32 of 248

Page 33

17 
Using NRF funding, PKC worked in partnership with the Scottish Invasive Species Initiative (SISI) to
create a control programme to remove giant hogweed, Japanese knotweed, white butterbur, and
American skunk cabbage
from the river Almond. 
Catchment scale control of a
river system requires
significant resources and a
strategic, multi-stakeholder
approach. By working
directly with SISI, PKC have
been able to follow their
model of INNS control,
engaging and working with
key stakeholders including
landowners, contractors,
and local volunteers. By
doing so, control efforts have
been maximised. 
A total of 35 people signed up to volunteer and after training attended 15 volunteer sessions on the
Almond in May and June 2023, including a session for INNS week. Volunteers carried out spraying
where giant hogweed infestations were severe and contractors treated harder to reach areas. 
Overall volunteers contributed 110 hours of
control time in 15 working days, with an
additional 70 hours of control time
contributed by PKC and SISI staff. This gave
a grand total of over 25 working days with
an additional 6 days of contractor work.
This effort has allowed PKC to bring
approximately 22km of river under
management in 2023, reaching from the
upstream source to the current end point
for control just past Bertha Park bridge. In
2024 PKC intend to bring another 3km of
the river under management to expand
control all the way to the Tay confluence. 
Tayside Biodiversity Partnership Projects with Young People 
Children’s Pocket Garden Competition
Page 33 of 248

Page 34

18 
With mentoring from the Tayside Biodiversity Partnership in 2021, Perth College Nursery and Glenlyon
Primary School submitted bids to win the Children’s Pocket Garden national competition. Glenlyon
Primary’s design was selected for the Keep Scotland Beautiful One Planet Picnic Pocket Garden
showcase in June and won a Certificate of Achievement. The children designed a garden that supports
people and wildlife by providing “a picnic for all” with a pond, bug hotels and fruit and vegetable
planting One Planet Pocket Picnic Garden Project | Glenlyon Primary School (glowscotland.org.uk)
Perth College UHI Nursery completed the ‘Virtual Nature School’ cohort 3 in 2023, a 6-week training
programme exploring the lifecycles of a butterfly, bird watching and nest building. The children wrote
a song called ‘The River Tay’ and created a pocket garden using recycled materials on the theme of
rivers. The design was selected to be displayed online on the Keep Scotland Beautiful website.
Going the Whole Hog 
NRF monies enabled 20 schools in Perth and Kinross to receive hogilo hedgehog homes and footprint
survey equipment in 2021/22. Glen Lyon pupils were treated to their first sighting on a trail camera set
up in the school grounds. This caused much excitement as it is rare to see hedgehogs that far up the
glen. 
Tayside BeeWild
Primary schools, care homes and
sheltered housing complexes
have worked with the TBP to
introduce pollinator-friendly
plantings, including fruit trees and herbs into the
grounds for the benefit of people and nature.  The
Tree Council has been introducing its Force for Nature
and School Orchards projects across Perth and Kinross
and there will be future links with the Perth and
Kinross Countryside Trust’s “A Tree for Each Child”
project. 
Photo (left): the new sensory garden at Parkdale Care Home,
Auchterarder; above – the BeeWild garden at Isla Court
Sheltered Housing, Bridgend (both NRF funded) © C A G Lloyd 
Empowering Communities to Protect and
Enhance Biodiversity
Since August 2021, PKC has been awarded capital funding as the area’s share of the Scottish
Government’s Nature Restoration Fund. Although the award could all be spent on Council land or
buildings, in line with the Perth and Kinross Offer, the Council has used a proportion of the funding to
Page 34 of 248

Page 35

19 
provide support to community-led biodiversity projects. In subsequent years, the same process has
followed with the grant being available for community-led biodiversity projects, as well as Council
ones. 
Year Financial
support
received
from
Nature Scot
(£)
Number of
community
projects
funded by PKC
NRF
Number of
school
projects
funded by PKC
NRF
Number of
SUDS/wetland
projects
funded by PKC
NRF
Number of
projects on
PKC land
funded by PKC
NRF
2021 166,000 10 5 2 15
2022 189,000 7 2 5 13
2023 353,000 14 1 7 2 
The 2022-23 Report can be downloaded from NRF_22-23_Web_Report.pdf (pkc.gov.uk). Going
forward, from 2023/24, 50% of the funding must be directed towards projects that contribute
towards the development of nature networks across Perth and Kinross. 
Biodiversity Villages, Towns and Neighbourhoods Initiative 
Tayside Biodiversity Partnerships Biodiversity Villages is an exciting project led
primarily by local communities with a focus on practical projects and citizen
science surveys. An extensive Biodiversity Villages Toolkit has been prepared to
help communities decide which projects to choose. The Council support the
project and funding has been earmarked by the UK Shared Prosperity Fund for
a Project Officer to help roll out up to 25 projects across Perth and Kinross.   
Blairgowrie & Rattray is Scotland’s first Biodiversity Town and BBC
Countryfile featured this in summer 2022. The Council has assisted
by attending the Blair Open Space Group to explain the planning
process and how biodiversity is incorporated into decision making.
The concept will be shared with other Local Authorities as Dumfries and Galloway, Fife, Highlands and
Aberdeenshire are interested in replicating the project. A Consortium will be set up in 2024 with a
good practice conference planned to take place in Perth. 
Page 35 of 248

Page 36

20 
Biodiversity Blair bioblitz (left) and checking tree guards in the orchard © BRD 
Page 36 of 248

Page 37

21 
3. Mainstreaming Biodiversity 
PKC signed the Edinburgh Declaration in November 2021 and in November 2022 declared a Climate
and Biodiversity Emergency demonstrating the Council's ongoing commitment to tacking tackling the
twin crises of climate change and biodiversity loss together and mainstreaming biodiversity
throughout the organisation’s functions.
Staff Roles 
The Council has several staff with specific biodiversity responsibilities:
• Tree and Biodiversity Officer to advise on and oversee the enforcement of the biodiversity duty
within PKC’s operations. This includes promoting the enhancement of developments for
biodiversity and ensuring developments reduce the impact on biodiversity through the
planning process and advising all Council departments on their legal requirements. The Tree
and Biodiversity Officer advises on how to protect and enhance wildlife across Council services
including Architects, Property, Housing and Education. 
• Tayside Biodiversity Officer to focus on delivering TBP actions within Perth and Kinross   
• Tree Enforcement Officer (Development management)
• Climate Change Land Restoration Officer
• Greenspace Policy Officer (trees and woodlands)
• Community Greenspace Climate Change Officer. 
New Staff 
Funding linked with the Council’s Climate Action Plan created a new full-time post in Community
Greenspace to mainstream climate change and biodiversity, achieve actions in the Climate Action Plan
and assist in allocating the NRF to projects on PKC owned land. Another full-time Climate Change Land
Restoration Officer post was created within the Climate Change and Sustainable Development team,
to deliver landscape scale restoration considering woodland creation, nature connectivity and
peatland restoration.   
Case Study: PKC Biodiversity Ambassadors 
The Biodiversity Ambassadors group consists of 80 members from all sections
of the council who are interested in nature and meet regularly, including in their lunch hour, to take
part in webinars and in person events including opportunities to get outside. This includes tree
planting, training sessions on species identification, presentations from external organisations. A key
role of Ambassadors is to help mainstream biodiversity and nature-based solutions throughout the
organisation by raising awareness through reporting back information to their teams and departments. 
Everyone is welcome to join, and no experience or knowledge of nature is required. Creating this group
has been one of the most successful measures to mainstream biodiversity within PKC. 
Page 37 of 248

Page 38

22 
In February 2023, PKC launched a new Sustainable Development and
Climate Change Hub for staff with a Biodiversity section. This helps to
outline to staff what biodiversity is, the biodiversity crisis, the statutory
duty and key milestones PKC have taken in conserving biodiversity. It also
provides information on the actions staff can take to help tackle the
biodiversity crisis and provides links to helpful resources.  To assist PKC
staff and provide inspiration for potential future contributions,
a 2nd Edition of the “Incorporating Biodiversity into Local Services”
handbook was published by the Tayside Biodiversity Partnership in 2020
and has been publicised to all staff. 
During 2023, PKC staff worked in partnership with three other Scottish
Councils to create a nation-wide biodiversity e-learning module for Local
Authority staff to raise awareness of the statutory biodiversity duty and the importance of biodiversity
in decision making. 
Inclusion in Structures Project Toolkit
Increased mainstreaming and awareness of the Council’s biodiversity duty has led to more queries on
ecological survey requirements, protection of bat roosts in bridges and how biodiversity can be
enhanced through Council projects. The Structures Team now consider impacts to biodiversity as part
of their Structures Project Toolkit and in some areas are providing bird and bat boxes in woodland near
where bridge repairs have been undertaken. In addition, otter ledges are being fitted to new bridges
to deliver biodiversity enhancement. A large-scale river project in Blairgowrie & Rattray led to creation
of two Habitat Regulations Appraisals (HRA) written by PKC and approved by NatureScot in 2020 and
2023. This process was used to create guidance and an HRA checklist for Council staff.   
Plans, Policies and Strategies 
New Impact and Value Assessment Tool for Sustainable Development
A new Impact and Value Assessment (IVA) tool was launched in 2023 to ensure Council projects,
strategies or proposals including all committee reports are screened against a range of statutory and
non-statutory criteria, including climate change and biodiversity. The IVA highlights likely positive
and/or negative biodiversity, climate change and environmental impacts early in the proposal
development stage, allowing time for feedback and/or mitigation to be built into the proposal.   
The sustainable land use tool on GIS highlights ecological and biodiversity constraints and is used by
Council Officers to inform proposals that require an Environment Impact Assessment and/or Habitat
Regulations Appraisal to ensure the Council complies with European environmental legislation and
statutory requirements. 
Work is ongoing to map the connections between the Council’s Quality of Life indicators and the UN
Sustainable Development Goals. Goals 14 and 15 have implications for biodiversity and we are in the
process of developing further indicators around these goals to monitor the Council’s performance
towards biodiversity at Perth and Kinross level. By engaging with communities over land use,
Page 38 of 248

Page 39

23 
communities have greater opportunities to raise awareness, influence the future of their areas, and
help create a sustainable environment for future generations. 
Open Space Strategy
An Open Space Quality Audit (OSQA) was undertaken to inform the preparation of PKC's first Open
Space Strategy which will be drafted in 2024 and identify actions to improve ecological functions and
connectivity across sites. The OSQA includes +500 sites within or adjacent to settlement boundaries,
including all Designated Open Spaces in PKC's Local Development Plan. The audit has been developed
by a cross-team working group, including colleagues from the Local Development Plans, Community
Greenspace, and Climate Change and Sustainable Development teams. 
Biodiversity is one of the five main categories for the audit and includes assessment of habitats,
naturalness, species, and connectivity. Results were mapped, highlighting open spaces with high scores
for biodiversity. The scores are supplemented with qualitative data gathered through the Big Place
Conversation engagement with local communities in 2023 which provided further insight into which
sites are important to communities due to biodiversity and recreational value. 
PKC Planning for Nature 
PKC developed Planning for Nature primarily as supplementary guidance to inform the planning
process but is also used as guidance for all staff to inform design and management of Council projects. 
It offers advice on the need for ecological surveys undertaken in accordance with best practice and
carried out by suitably qualified and experienced persons as well as the need for impact assessments
and clear evidence of the mitigation hierarchy. The recommended biodiversity enhancement measures
are being integrated into PKC projects as detailed in Section 2. This ensures that the requirement from
external and private developers is like requirements for PKC projects and plans. The guide has been
advertised through internal channels, email signatures and a training session for all Council staff is
planned for 2024. 
Internal Guidance Notes
Internal guidance notes for staff have been created on topics including incorporating biodiversity into
allotments, creation of green graveyards and native woodland and heathland restoration best practice. 
Procurement Changes 
PKC Community Greenspace have adopted a sustainable procurement policy by asking for information
on what will be done to minimise the environmental impact of proposed activities and services. This
is a part of the technical questions that are weighted and contribute to a bidder’s tender score. 
4. Nature-Based Solutions, Climate Change and Biodiversity 
The need to address the cause and effects of climate change and the drive to help meet national
targets is a common thread across the topics within the Council’s land use planning policy framework.
The Climate Change Board, established in 2018, leads on climate change within the Council placing a
commitment to tackling the twin crises of climate change and biodiversity loss together. 
Page 39 of 248

Page 40

24 
The Perth and Kinross Climate Commission
The Perth and Kinross Climate Change Commission (PKCCC) was formed May 2022, bringing together
people and organisations from the public, private and civic sectors who work collaboratively to help
drive, guide, support and monitor climate action. The PKCCC was set up as an independent body
responsible for cross-sector collaboration and action on climate change. The Commission plays a vital
role in promoting a climate resilient future which is also fair and ensures that there is climate justice. 
It is an independent body responsible for: 
• Scrutinising the initial roadmap developed by the Council.
• Identifying ideas and good practice that should be promoted.
• Shaping the expansion of and further development of the roadmap through co-production,
guidance and feedback.
• Promoting appropriate community engagement on climate change.
• Overseeing delivery of the roadmap and its impact through regular monitoring.
• Championing climate change and delivery of priority actions across Perth and Kinross.
• Using its influence across the public sector, private sector and in our schools and
communities to drive the necessary urgent action.
• Consider the connections between the climate crisis and other ongoing pressures – including
the biodiversity crises, increasing cost of living, fuel poverty, inequalities, and health. 
Council’s Climate Change Working Groups
Internally, there are climate 8 working groups with two focused on land use and resilience which aims
to combine actions for biodiversity and climate change through nature-based solutions. The COSLA
Considering Nature in Decision Making Elected Member briefing on Nature-based Solutions was
circulated to members to raise awareness and understanding of the principles and benefits of using
nature-based solutions. 
Commissioned Research
Perth and Kinross Council commissioned Arup to develop a Climate Risk and Opportunity Assessment
(CCROA) for the PKC area. Climate risk assessments identify the likelihood of future climate hazards
and their potential impacts for cities and their communities along with the wider impacts on nature
and biodiversity. This information is fundamental for informing the prioritisation of climate action,
investment in adaptation and supporting community resilience groups. The results of the CCROA will
be used to inform and update the Council's existing Climate Action Plan in relation to adaptation and
resilience. 
The James Hutton Institute were commissioned in 2021 to assist in the understanding of the impact
and potential contribution of rural land uses to net zero through a Carbon Sequestration Project. The
objectives of the study were to: 
i) Summarise carbon equivalent emissions from the Perth and Kinross Council area.
ii) Provide evidence of the carbon stocks in the Perth and Kinross Council area. 
iii) Identify the potential for the sequestration of greenhouse gases, and how certain uses of
land may impact upon the increase or decrease in carbon stocks; and 
Page 40 of 248

Page 41

25 
iv) Propose approaches for consideration in how communities can contribute to the tackling
of climate change (e.g., through social innovation, promotion of local action), and uses of
natural capital to inform the achievement of the aims of climate neutrality. 
The report highlights the significant potential to reduce emissions and sequestrate carbon across Perth
and Kinross through sustainable land management, particularly in respect of woodland expansion,
peatland restoration, the use of nature-based solutions, and a transition to agro-ecological farming
practices and systems.  The results of the study will be used to inform the Spatial Strategy for Local
Development Plan 3, and the review of the Council's Forest and Woodland Strategy. 
Working At a Regional Scale to Restore Nature
Conducting a review of all PKC actions in the Tayside Local Biodiversity Action Plan highlighted several
actions towards which PKC had made little or no progress towards due to insufficient resources. It was
clear that many of the actions in the LBAP and Climate Action Plan complement each other and are
best tackled on a large, landscape scale. Furthermore, the recent decision to ask all Local Authorities
to create Nature Networks Nature Networks explained | NatureScot further strengthens the need to
work to collect data and build partnerships to work on a landscape scale within the Perth and Kinross
Council area with bodies such as NatureScot, SEPA, the Tay District Salmon Fishery Board, Forth Rivers
Trust and local landowners and communities.  
PKC’s new Climate Change Land Restoration Officer will contribute towards the 19 LBAP PKC Actions
including reviewing “cross-boundary” opportunities to join up paths and habitats between local
authorities, habitat corridors, invasive non-native plant control and ash dieback. Afforestation and
peatland restoration will also be a focus. A challenge to achieving this is that much of the land is out
with the control of the Council, but the person will work with landowners and local communities to
encourage action.  
New Perthshire Nature Connections Partnership 
In 2021, the Perthshire Nature Connections Partnership (PNCP) was created as a long-term, nature-
based vision for Perth and Kinross that aims to create a connection between the Cairngorms and Loch
Lomond and the Trossachs National Parks. As an integrated landscape-scale ecological restoration
project, PNCP provides connections to create and re-establish a sustainable and resilient landscape in
Perthshire that provides environmental, health and wellbeing, and socio-economic benefits to local
communities, landowners and land managers. The Conservation Officer is part-funded by PKC and
hosted by the Perth and Kinross Countryside Trust. 
Case Study: Investment Readiness Pioneers - Almond Headwaters 
In May 2023, the Perthshire Nature Connections Partnership received £124K from the Esmée Fairbairn
Foundation for the Upper Tay Catchment Communities - Almond Headwaters project. It is one of two
in Scotland to receive a ‘Riverwoods - Investment Readiness Pioneers’ award.
Riverwoods - Investment Readiness Pioneers awards grants to develop corporate and private funding
for nature and climate recovery, and to increase community benefits from nature restoration projects.
Page 41 of 248

Page 42

26 
This project seeks to create an investable project that implements multiple interventions aimed at
restoring the quality of the upper Almond’s riparian habitat. 
Award Winning Kinross Raingardens Trail
Funded by PKC Nature Restoration Fund, the Kinross Raingardens Project won the prestigious
Construction Industry Research and Information Associations Susdrain ‘UK Community SUDS’ Award
in 2022. The Raingardens Trail is a successful collaboration with Scotia Seeds, the Kinross-shire Civic
Trust, PKC, and the Tayside Biodiversity Partnership. The Park and Ride part of the project is a
demonstration site that can be used to inform further raingardens in future developments. In effect
the trail is a series of smaller-scale projects, starting at the park and Ride and going along to the
industrial estate. Portmoak Primary School, Loch Leven’s Larder, Kirkgate Park, and the Loch Leven
Boathouse are all part of the wider initiative. Where biodiversity is concerned, the trail provides a
series of permanent pollinator steppingstones and supports habitat restoration. Other sites within
Kinross are being considered, including amphibian scrapes and a raingarden hedge. 
Perth Holds SuDSNET Conference 
Perth hosted the SuDSNET (the Sustainable Urban Drainage Systems Network) conference in April
2023. The Scottish Universities Green Infrastructure Research Group first met in 2015 and has recently
been holding joint meetings with the Abertay University-based SuDSNET was set up in 2004 with an
international remit to bring together researchers, practitioners, and developers. The Valuing the
Benefits of Blue-Green Infrastructure conference was preceded by site visits exploring the award-
winning Kinross-shire Raingardens Project. 
Natural Flood Management and Catchment Management
The Council is a partner with NatureScot, SEPA, the Forth Rivers Trust and others to explore setting up
a Landscape Enterprise Network in the Loch Leven catchment. Following a scoping report which built
on a Natural Flood Management study for the Kinross South flood scheme, further funding has been
secured to develop investible projects over the coming year. Practical work in the catchment for natural
solutions to control erosion and reduce nutrient input into the Loch Leven National Nature Reserve
has been funded by the Council. 
Trialling Nature Based Solutions 
Through the Nature Restoration Fund, the PKC Greenspace team has undertaken projects to restore
native habitats and enhance our local ecosystems. One of the projects involved tree planting at
Jeanfield in Perth where using nature-based solutions will help mitigate the ever-increasing flooding
Page 42 of 248

Page 43

27 
issues. These trees will help to increase water absorption, catch rainfall, and slow down surface water
run-off. Elsewhere, a nature-based solution for bank erosion was attempted by using a Flex MSE
vegetated wall solution at Buckie Braes. This was dislodged during substantial flooding and other
natural solutions for bank erosion are being considered. 
Main climate change related challenges for biodiversity over the next three years
in a PKC Context
The above-mentioned Perth and Kinross Climate Change Risk and Opportunity Assessment looked at
the already experienced changes and projected climatic variability at timesteps between 2030 and
2100.  There were several occurring and short-term changes identified, which are linked with the
following key potential impacts:
• Lack of connected habitats to allow species to move north or higher up the hill to follow their
preferred ‘climate space’.  Some species may decline, such as those that thrive on mountain
tops such as mountain hare that may not be able to move within Scotland. For many species
the loss of suitable habitat may restrict their spread. For example, the Arctic charr lives only in
cold lochs that are now being affected by rising water temperatures. 
• Continued habitat loss and fragmented habitats on isolated islands located within intensive
agricultural and urban areas. 
• More extreme weather events such as Storm Arwen causing habitat changes and woodland
cover losses. Changes in seasonal rainfall and more extreme weather events will affect rivers,
wetlands, hill slopes, and coasts. Rivers may flash flood more frequently in winter, which can
wash out spawning beds for salmon and cause erosion and slope instability. 
• Snow cover declines cause an increased mismatch in seasonal camouflage for mountain hares,
leaving them more vulnerable to predators. 
• Warmer temperatures allowing pests and diseases, including invasive non-native species, to
establish or spread further. These are difficult to predict, but new plant diseases are already
threatening native trees. Ecosystems that are under stress from climate change and other
factors, such as pollution, may be more vulnerable to pests and diseases. Ash dieback is
causing significant tree loss in PKC area currently. 
• Seasonal changes to precipitation already occurring – decreased summer precipitation with
increased draught risk will compound the impact on habitats and species. 
In addition to the above-mentioned impacts, more widely, carbon reduction often takes a centre stage
of climate action, with the climate impacts on and resilience of biodiversity receiving less focus.
Additionally, there are some potential conflicts between carbon reduction maximation and biodiversity
benefits that will need to be considered (e.g., Sitka Spruce has very high sequestration rates, but low
biodiversity value).  With the joint declaration of the climate and biodiversity emergencies in
November 2022, PKC has stated its desire to address these crises jointly. 
Page 43 of 248

Page 44

28 
Page 44 of 248

Page 45

29 
5. Public Engagement and Workforce Development
Public Engagement
By engaging with communities over land use, such as the Local Development Plan and greenspace
management, communities have greater opportunities to raise awareness, influence the future of
their areas and help create a sustainable environment for future generations. 
The Big Place Conversation
The Big Place Conversation was the main engagement activity for the next Local Development Plan
(LDP3). This utilised the Place Standard Tool and engaged with over 1500 people and organisations.
This includes a question specifically on access to nature and participants, including school pupils, older
people and community groups provided their views on how their place could be better for nature and
areas that should be protected. The information will help in the design of nature networks and
identifying areas for protection in LDP3. 
New PKC Climate Action Website
PKC launched a new website dedicated to taking climate action in 2022 following requests for a
central source of trusted and knowledgeable climate action advice for residents, businesses, and
visitors. The website highlights the PKC Climate Strategy and Action Plan, guidance on how to take
action at home and at work, grants that relate to climate initiatives for
households, businesses and community groups, and climate related
events. Included on the website is a Community Projects & Groups map
which captures examples of climate action across Perth and Kinross. It also
provides information on community climate action projects and groups,
including a variety of Carbon Stories highlighting good practice. The
Facebook page is used to regularly update on biodiversity projects,
surveys, local events, and news  https://www.pkclimateaction.co.uk/ 
Nature of Cities Festival International Conference 
The Perth City Leadership Forum shared a vision to make Perth the most sustainable small city in
Europe and for each year of this decade it will focus on one theme. In 2022 the focus was nature and
biodiversity. PKC was a part of a workshop at the online 3-day event highlighting good practice in new
Page 45 of 248

Page 46

30 
housing developments requiring biodiversity enhancement measures as standard including swift
bricks, hedgehog highways and wildlife kerbs. 
Perth Winter Festival
PKC Climate Action engaged with people
enjoying the Christmas light switch-on in
2022 with a colourful stall.  Over 60 people
made a pledge for the environment to do
their part to help tackle the climate
emergency and improve biodiversity. A range
of sustainable tombola items were won,
including spring bulbs, pollinator friendly
plants, bee homes and bird boxes. 
Climate Action Earth Day Market 2023
On 22nd April 2023, community groups, businesses and environmental organisations came together to
host an Earth Day Market. The market featured products from local suppliers and stalls showcasing the
valuable work being undertaking across Perth and Kinross to help the environment. The Perth and
Kinross Countryside Trust delivered a workshop for young people to learn about tree planting. 
Youth Climate Conference 
In November 2022, PKC hosted their first Youth Climate Conference as a pre-summit to COP27, the 27th
annual climate change conference of the United Nations. Through inspiring talks, interactive
workshops, and action planning, around 100 secondary school pupils gained a greater understanding
of the climate and nature crises, and how to take action for climate and nature.
Among the speakers and workshops were SCOTLAND: The Big Picture Nextgen which focused on
discussing threats to nature, the actions pupils could take to help rewild, and making a pledge for the
wild. The conference provided opportunities for pupils to learn, collaborate, innovate and take action
locally on climate change and biodiversity. With the success of the first conference, this will now be
hosted annually with a range of different speakers and workshop facilitators involved. 
Page 46 of 248

Page 47

31 
A group of colleagues from Biodiversity and Trees in PKC welcomed a group of students from Scotland's
Rural College (SRUC) who were studying Multipurpose Woodland Management. We toured Kinnoull
Hill SSSI in Perth covering the new management plans, proposed actions for biodiversity and visitor
management. The Tayside Biodiversity Partnership works with primary schools, care homes and
sheltered housing complexes, see section 3. 
Supporting Volunteers
Community Greenspace supports a range of community groups who operate in parks, cemeteries and
on footpath networks through Perth and Kinross. Community Greenspace support over 30 path groups
across Perth and Kinross who undertake path maintenance by clearing footpaths, thinning trees,
removing litter and planting wildflower meadows. PKC Rangers support volunteers to remove INNS in
some areas. Community Greenspace offers support to over 20 community gardens, allotments, and
orchards. The Ranger Service has devoted 182 annual hours in 2022 and 462 so far in 2023 with
biodiversity and environmental groups. 
The Rangers run woodland activity sessions for people with early stages of dementia tackling social
isolation and providing health and wellbeing benefits to participants, carers, and family members.
Kinnoull Hill in Perth provides a place for walks, views from the top and The Shed to shelter in on rainy
days and enjoy a social lunch at the end of the session. Participants enjoy meeting new people,
enjoying nature as well as completing the John Muir Award. 
Page 47 of 248

Page 48

32 
Case Study: Friends of Cemeteries Groups
Since 2021, 15 Friends of Cemeteries Groups
have been established with local volunteers
dedicated to improving their local graveyard.
Some groups started primarily to maintain
grass cutting and neatening path edges but
now many are providing habitats for nature
with additional No Mow and Managed for
Wildlife grassland management areas, four
double rows planted with wildflowers and
bulb planting in 2023.  Friends of Jeanfield
and Wellshill carried out wildflower surveys
as part of the PKC biodiversity monitoring,
and Kinnoull Old Burial Ground Group arranged a lichen expert to visit. 
Through the Tayside Biodiversity Partnership with the Amphibian & Reptile Conservation Trust and
TayARG (Tayside Amphibian & Reptile Group) an Amphibians in Graveyards Citizen Science Survey is
underway. Advice to the Green Shoots Aberdalgie Outreach Project has seen them become a Friends
of Cemeteries group and a fledgling Green Graveyard project. 
Improving Access to Nature for All
The Greenspace Team maintains and repairs public facilities within greenspaces and the wider core
path network to ensure they remain safe and attractive. Greenspace have signposted most of the
2048km core path network in Perth and Kinross and support numerous path groups to help maintain
core paths, rights of ways and other countryside paths. Greenspace officers work closely with
landowners, access takers and the Local Access Forum to ensure the right of responsible access is
unobstructed and undeterred.
The Policy Team are actively working on improving a long-distance route between Crieff and Comrie.
Draft management plans for Council owned countryside sites have been created in consultation with
local stakeholders since 2020 for Den of Alyth, Rumbling Bridge and Black Spout Wood. Support is
given also to the Perth and Kinross Countryside Trust on various path improvement projects.  
Page 48 of 248

Page 49

33 
Workforce Development 
Biodiversity Ambassadors
Since our last report in December 2020,
PKC Biodiversity Ambassador
membership has grown from 60 to 80.
The group work to help mainstream
biodiversity and nature-based solutions
through PKC for the benefit of people
and nature. A lively Teams chat, regular
training sessions and a programme of
events are created and it’s a chance for
colleagues from different areas of the
Council to work together for the benefit
of biodiversity. Everyone is welcome to
join, and it is a great chance for PKC staff
to gain new skills, meet new people,
have fun, and help nature recover. To continue spreading the word and to recruit new members, an
information stall is held at Corporate Induction events for new PKC staff. Online videos and articles in
internal Council correspondence such as the Health and Wellbeing newsletter has also increased
awareness of the group. 
Biodiversity and Trees Training Sessions and PKC Biodiversity Ambassador Events
Year No of
events
total
No of
Externally
Led
events
Total no.
of Staff
attending
events
Topic examples 
2021 5 4 90 Grassland management series: Don’t Mow, Let it Grow by
the Causeway Coast & Glens Borough Council, On the
Verge Stirling, Edinburgh Living Landscapes and Dr Phil
Sterling from Butterfly Conservation
2022 13 4 229 Tree Reports and Issues for Planners
Protecting trees from Beaver damage
Rejuvenating Business Parks
Butterfly and Wildflower ID session
Training on SUDS and amphibians
2023 10 8 140 Outcomes of COP15 negotiations
Woodland Trust Session for Planners
Riverwoods webinar 
Intro to Pollinators and FIT Count by Buglife 
Bat Ecology Training
SSEN Biodiversity Net Gain webinar
Local Nature Conservation Sites introduction and site visit
Page 49 of 248

Page 50

34 
Practical Activities 
PKC staff are encouraged to take part in a range of practical activities to learn more about nature, make
a positive impact and to raise awareness of the wellbeing benefits of being active outdoors in nature.
Articles in the PKC Health and Wellbeing Newsletter helps to promote opportunities. Several events in
2023 were accessible to all and additionally advertised to the diSABILITY Staff Network. 
• PKC Biodiversity Ambassadors set up practical volunteering opportunities to record
wildflowers and invertebrates for the PKC grassland management biodiversity monitoring
using a newly created app. 
• PKC Biodiversity Ambassadors guided walks and litter picking in local parks and greenspaces. 
• A site visit to the river Almond to learn more about the PKC partnership project controlling
invasive non-native species.
• Site visits to Denmarkfield to learn about rewilding and grassland management. 
• Walk and talk along the Perth Lade to discuss potential development, impact to biodiversity
and local communities.  
• Pond clearing to benefit amphibians at the North Inch in Perth in partnership with Tay ARG
(Amphibians and Reptiles Group). 
Get Sett Scotland
PKC Biodiversity Ambassadors joined Morag from Scottish Badgers for training to find signs of badgers.
Volunteers signed up to help with the 3-year project entitled ‘Get Sett Scotland’ to re-run the Scottish
Badger Distribution Survey undertaken by the charity back in 2006-2009. The aim of this new citizen
science project is to estimate change in the density and distribution of badger main setts across a range
of habitats in Scotland. Training was given on how to spot field signs of badgers including their hair
(which is distinguishable by how hard it is to break), latrines, badger paths and setts. Any evidence of
human disturbance will also be noted. All volunteers were given a 1km square to survey in
winter/spring 2023 to feedback results to Scottish Badgers 
Page 50 of 248

Page 51

35 
The Impacts of Rubbish on Wildlife
Inspired by the many community groups and individuals volunteering to pick up litter in Perth and
Kinross and to coincide with the National Spring Clean, PKC’s Climate Change Team organised a series
of litter picks for staff in April 2023. 
Litter picking was undertaken on land and on the River Tay via canoes. 65 bags of litter were collected
in just four hours. The event highlighted the financial costs of clearing up litter to PKC (over £2 million
annually) and the negative impacts to health, wellbeing, and wildlife. 
6. Research and Monitoring 
Supporting Students 
During 2022 and early 2023, the TBP assisted an MSc student studying Environmental
Entrepreneurship at the University of Strathclyde with a community SuDS survey. 
Case Study: Nature in Parks: A Balance of Established, Wild & Tamed 
Page 51 of 248

Page 52

36 
During 2021 PKC assisted an MSc student studying Countryside Management at SRUC to investigate
attitudes towards increasing areas of long grass and wildflower meadows in parks and greenspaces
within Perth and Kinross. Results indicated awareness of biodiversity was high, as 94% had heard the
term before the questionnaire. Respondents were highly supportive of managing parks to improve
biodiversity and 91% were more in favour of wildflower meadows than long grass areas (73%). 
Respondents were asked about benefits and concerns regarding wildflower meadows and long grass
areas. The majority agreed that both measures would increase biodiversity and be more interesting
to look at. Additional benefits identified included educational opportunities, reduction in chemical
use, time and money spent cutting amenity grass, and enhanced health and wellbeing benefits.
Respondents indicated concerns related to dog fouling loss of space for sport and activities,
increased risk of ticks and a lack of long-term management of areas. 
Although respondents were supportive of more wildflower meadows and long grass areas, it was
conditional on establishment of ‘Park Rules’ (see box). 
“Education is essential to involve public, to build pride in the
wild look, ensuring respect maintained so litter and dog
fouling don’t become the norm.” - Respondent 
The findings of this study suggested there is an opportunity
to improve parks for nature, improve parks for people and
enhance the connection between the two to realise a “win-
win”. However, support is conditional on long term
management plans, community consultation and
engagement prior to making any changes. 
Research
In 2023, PKC commissioned Arup to develop a Climate Risk and Opportunity Assessment to identify
the likelihood of future climate hazards and their potential impacts for PKC communities. in 2021, the
Council commissioned a Carbon Sequestration Project with the James Hutton Institute (JHI). 
Monitoring PKC Actions for Biodiversity
Across many Council functions, monitoring activities are hampered by the lack of resources and the
inability to use funding such as the NRF for ongoing monitoring. Activities undertaken within the three
SSSIs in PKC ownership and larger greenspace sites will be monitored to ensure the desired outcomes
Page 52 of 248

Page 53

37 
are being met. Greenspace Ranger staff and volunteers will observe other management programmes
and report back. 
In 2023, residents reported a lack of wildlife kerbs in a new development in Blairgowrie located close
to a SUDS pond used by amphibians and reptiles. An enforcement action was raised with the
developers and the wildlife kerbs provided in the required areas within weeks. 
Monitoring Grassland Management 
Biodiversity monitoring was carried out from April to September 2022 by volunteers and PKC
Biodiversity Ambassadors. Areas of uncut grass were compared to nearby short mown amenity grass
and the number of wildflowers, pollinators and birds were noted and photos submitted. The aim was
to investigate the biodiversity value of sites where mowing will be altered and collect information on
the wildflowers that are naturally present in the seed bank but have been suppressed by regular
amenity mowing. This created a baseline to provide comparison once future management regimes
have been implemented. 
A total of 133 surveys were received from 44 surveyors. 135 were completed via the newly created
app to collect data online and the rest were emailed forms. Results indicated that uncut areas
contained more wildflowers, more wildflowers in flower, and a higher number of different species
compared to amenity cut grass. A total of 64 wildflower species were recorded that would not have
flowered had these areas continued to be close mown. Bees, butterflies and other insects were more
abundant in uncut grass areas than cut, see table below. The Results and Discussion Paper contains
more detailed information. Results are being used to inform future plans for grassland management
in parks and greenspaces in PKC. 
Mini Bio-Blitz
Perth and Kinross Biodiversity Village, Town & Neighbourhood communities ran an online mini bioblitz
in their patch in July and August 2023 looking for 10 species: hedgehog, slow worm, house sparrow,
song thrush, brown hare, red admiral butterfly, common carder bumblebee, harebell, ox-eye daisy and
ragged robin. All sightings were recorded on iNaturalist and will help inform future management
decisions. 
Biodiversity Measure
Uncut
Areas
Cut Areas as
Normal 
Wildflowers present 95% 78%
Wildflowers in flower present 88% 32%
Number of different looking wildflower species (average) 6.2 2.3
Butterflies present 30% 6%
Number of different looking butterfly species 7 5
Bees present 46% 11%
Other insects present 65% 15%
Page 53 of 248

Page 54

38 
Contributing to the National Biodiversity Network Gateway
Tayside does not have a Local Records Centre which is a significant limitation, however PKC is a part of
the Better Biodiversity Project Group as part of the National Biodiversity Network Trust’s Better
Biodiversity Data Project. PKC Biodiversity Ambassadors and all staff are encouraged to report all
sightings to the NBN Atlas online. 
As part of the National Biodiversity Network, the staff setting up the Scottish Building Better Data
project (funded by the Scottish Government) have met Perth & Kinross Council, the TBP, Angus Dundee
City Councils to discuss the creation of Biological Recording Data Hubs. This is long overdue in Tayside
and will greatly help the region’s planners and developers. 
Case Study: New Young Wildlife Recorders’ Group
Recognising that there is an urgent need to welcome and train new wildlife recorders owing to the
aging demographic of species and habitats specialists, the TBP has started to set up a new Young
Wildlife Recorders’ Group. Liaising with the British Trust for Ornithology (BTO) and Butterfly
Conservation, a funding application prepared jointly with the Perth & Kinross Countryside Trust has
been submitted to run the first pilot. From a very well-attended online meeting in January 2023, many
other local and national organisations and groups have confirmed they are keen to help with a much
larger-scale project when the time is right. 
This pilot phase of the project will be very much a mentoring one with 10 young recorders applying to
join Butterfly Conservation and BTO mentors to learn recording and monitoring skills for butterflies,
moths and birds.  
The larger project in the future will expand this idea to all ages (12-30) where 1:1 mentoring is a key
part of the project, but also more general citizen science projects rolled out to larger groups, including
schools and youth organisations. Online webinars, special events led by specific organisations and a
Young Wildlife Recorders’ Conference will be held. 
In tandem with the Young Wildlife Recorders’ Group, the ‘Every Action Counts Citizen Science’
Initiative will expand the work of the Tayside Recorders’ Forum by setting up a similar project to the
Forth Nature Counts project. This will expand the programme of wildlife survey, identification skills
workshops and events linked to the Biodiversity Villages, Towns & Neighbourhoods Initiative.
The PKC Biodiversity Ambassadors group encourages all staff to take part in citizen science projects
and those that contribute towards the National Biodiversity Network Gateway such as BeeWalk, Saving
Scotland’s Red Squirrels, Big Butterfly Count, Big Garden Bird Watch, Tayside Swifts and ZoomIn2 time
lapse photographic project. An online editable map to record biodiversity within Perth and Kinross
parks and open spaces has been developed by the Council and will be expanded in 2023. 
Page 54 of 248

Page 55

39 
7. Biodiversity Highlights and Challenges
2021-2023 Highlights 
As described in the preceding sections, there has been an abundance of positive action taken both
by the Council directly and by our communities with support from the Council that has led to positive
progress in addressing the Biodiversity Crises across Perth and Kinross.  From this, the top 10
highlights have been identified. 
1. Receiving over £700k of Scottish Government Nature Restoration Funding from 2021 that has
enabled more than 30 projects to be successfully delivered by PKC and community groups,
with a further 18 on-going in 2023/24.
2. Developing a new approach to grassland management across Greenspace in Perth and Kinross.
The 2022 biodiversity monitoring of the new sites by PKC Biodiversity Ambassadors and
volunteers showed positive biodiversity enhancements and the success of a newly created
citizen science project.
3. Developing and adopting the Planning for Nature Supplementary Guidance to set clear
expectations and requirements for planning applications regarding information on
biodiversity. By clarifying expectations, it is expected to both enhance applicant experience by
reducing the need to back and forth requesting further information as well as promoting best
practice. Implementation of the Guidance has been supported by workshops for Development
Management Officers and was highlighted at the 2023 Housebuilders Forum to raise
awareness with developers. 
4. Mainstreaming of biodiversity throughout the organisation – an example of this is the new
Protecting Swifts in Conservation Buildings working group set up in 2023, where PKC is working
in partnership with the Perth & Kinross Heritage Trust in considering Swifts in the heritage
funded conservation projects. 
5. Building a successful partnership with the Scottish Invasive Species Initiative and local
landowners to deliver a catchment scale approach to INNS control project on the River
Almond. The developed community involvement, with 35 community volunteers taking part.
6. Creating the new Climate Action website and social media channels to raise awareness of
actions to tackle the twin crises of climate change and nature loss, with Nature being the key
theme of the campaign in Spring & Summer 2023.
7. Developing our Biodiversity Towns and Villages programme, with Blairgowrie & Rattray named
Scotland’s first Biodiversity Town. 
8. Supporting partnership to tackle landscape scale challenges with the Perthshire Nature
Connections Partnership and Conservation Officer post.
9. Increasing our biodiversity workforce with the establishment of the Climate Change Officer
into Community Greenspace and creation of a new Climate Change Land Restoration Officer
to further landscape scale restoration and further upskilling our existing workforce. 
10. Growing the membership of PKC Biodiversity Ambassadors.  This has enabled the sharing of
ideas, good practice and creating new collaborations and partnerships has resulted in on the
ground actions and changes to Council policies and procedures. 
Potential challenges for 2024 to 2026 
Page 55 of 248

Page 56

40 
Several potential challenges to biodiversity delivery have been identified for the upcoming three-year
window between 2024 to 2026.  A summary of the main challenges include:
1. While the Council has increased its biodiversity resources over the last three years, the
increased need to incorporate greater levels of biodiversity enhancement into planning
decisions and operational enhancements, still leaves limited staff resource to: 
a. implement NPF4 requirements and creation of nature networks across Perth and
Kinross;
b. provide long term management plans and tree planting plans for PKC owned and
maintained land;
c. undertake long-term biodiversity monitoring of projects. 
2. The annual nature of NRF funding and theme confirmation, results in limited implementation
windows and impacts on the availability of contractors to carry out the works.
3. Tayside does not have a local biodiversity records centre which is a challenge to the Council as
biodiversity data is held in several different locations rather than one centralised database. A
records centre would also aid development management and land use decisions as well as
creation of nature networks. 
4. While the Council has its LBAP, there is an identified gap around the development of long-term
Council specific biodiversity and greenspace strategies and policies to improve co-ordinate
delivery, prioritise, and secure necessary resources for biodiversity enhancements on Council
owned land to deliver multiple benefits. 
5. Effective Invasive non-native species (INNS) control requires a catchment-wide long-term plan. 
There is not currently one for the River Tay catchment, which is a challenge for effective
management. 
Page 56 of 248

Page 57

41 
8. Conclusion 
The Council recognises it must play a key role in helping to deliver a more sustainable and biodiversity
rich area, as an employer with responsibility for staff and buildings, as a provider of local services, and
as a community leader working in partnership with a range of stakeholders. Furthering the protection
and enhancement of biodiversity is a continual work in progress with links across many Council areas,
and this report highlights the diverse range of activities undertaken by various teams as part of their
regular work programmes. 
There are many exciting opportunities and projects to explore such as the Tayside Biodiversity
Partnership’s Biodiversity Villages project, designating a suite of Local Nature Conservation Sites,
reviewing management of our greenspaces and developing long term strategies for biodiversity,
greenspaces and invasive non-native species control. 
The Council recognises there is still a lot to achieve within a minimal resource environment and we
plan to map the resources required working collaboratively with our communities and other partners
to deliver biodiversity protection and enhancement in the most efficient manner for the next reporting
period in three years. 
The Council has made significant progress to raise awareness of biodiversity and collaborate with the
local community, neighbouring local authorities, and stakeholders to ensure that biodiversity is at the
forefront of our work and will be enjoyed for generations to come. We are grateful to the financial
support received from Scottish Government and to the vast contributions made by local communities
and volunteers across Perth and Kinross. 
Please follow these links for further information on Enhancing Biodiversity in Perth and Kinross and
Biodiversity Projects in Perth and Kinross. 
Page 57 of 248

Page 58

Page 58 of 248

Page 59

PERTH AND KINROSS COUNCIL 
Climate Change And Sustainability Committee 
27 November 2023 
PUBLIC BODIES CLIMATE CHANGE DUTIES REPORTING 2023 – 
CARBON EMISSIONS 
Report by Executive Director (Communities)
(Report No. 23/329) 
1. PURPOSE 
1.1 This report provides an overview of the Council’s annual Public Bodies
Climate Change Duties Reporting (PPCCDR) submission. It includes an
update on the Council’s carbon footprint and emissions trends for the
reporting year 2022/23 along with wider actions the Council is taking to
address the Climate Emergency. Based on this evidence, the report to the
Scottish Government has been developed for consideration. 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
i. comments on the contents of the report, along with the updated report
to the Scottish Government (Appendix A)
ii. notes the progress in developing benchmarking information and the
need to use it to provide an evidence-based platform to inform
decisions and monitor performance
iii requests officers to circulate a briefing note on high carbon within
PKC’s purchased goods and services once the outputs from
consultants are finalised and include an action in the Climate Change
Action Plan to develop a plan for addressing these areas. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues
• Section 5: Conclusion
• Appendix A: Public Bodies Climate Change Duties Report 
5
Page 59 of 248

Page 60

4. BACKGROUND / MAIN ISSUES 
4.1 Perth & Kinross Council, as a listed public body in Schedule 1 of the Climate
Change (Duties of Public Bodies; Reporting Requirements) (Scotland) Order
2015 as amended by the Climate Change (Duties of Public Bodies: Reporting
Requirements) (Scotland) Amendment Order 2020, is required to report
annually via the Sustainable Scotland Network Report to the Scottish
Government. This is required in order for Perth & Kinross Council to comply
with its climate change duties as established under Section 44 of the Climate
Change (Scotland) Act 2009 and as stated in Schedule 2 of the 2015 Order. 
4.2 In addition to the above, the 2020 Amendment Order set out additional
reporting requirements from 2021/22 in response to the global climate
emergency and Scotland’s net zero targets, as well as the interim targets as
set out in the legislation. The compliance reports must now address additional
sections that include, but are not limited to, the Council’s target date for
achieving zero direct emissions, how the Council will align its spending plans
and use of resources to deliver its emissions reduction targets, and how the
Council will publish its progress to achieving its emissions reductions targets. 
4.3 As part of the approval of last year’s report (Report No. 22/282 refers) in
November 2022, the Committee requested officers to develop a robust Scope
3 reporting methodology for the Council by November 2023.  However, it is
important to note that baselines for Scope 3 calculations vary with more
categories being added. As such, it may not always be possible to recalculate
baselines retrospectively. This could have an effect on trends and overall
calculations. Under the Greenhouse Gas Protocol guidelines, there are 15
identified Scope 3 emissions reporting categories.  Of those, the following
seven were deemed relevant to PKC operations: 
Table 1 Scope 3 emissions categories assessed as relevant to Perth & Kinross Council
Scope 3 emissions category Comment
1. Purchased goods and
services
New - detailed in Paragraph 4.9-4.11, but not included in the
PBCCDR
2. Capital goods New - detailed in Paragraph 4.9-4.11, but not included in the
PBCCDR
3. Fuel and energy related
activities
Included - No change to methodology from previous years 
4.Waste generated in operations Included - No change to methodology from previous years
6. Business travel Included - No change to methodology from previous years
7. Employee commuting &
homeworking
Employee commuting – new addition this year
Homeworking emissions – Changed methodology in the PBCCDR
and improved data
Results of the staff travel and homeworking survey were used to
inform these categories
15. Investments Not included in the reporting year – Primarily associated with
pension investments, which requires joint progression with other
Tayside Local Authorities. 
Page 60 of 248

Page 61

4.4 Since the Council’s first report in the pilot year 2014/15, the Council’s carbon
footprint has followed a decreasing trend until 2018/19, which has then been
followed by both increases and decreases between 2019 and this reporting
year. This is illustrated in Table 2. The baseline year has been set as 2015/16
as per the reporting guidance, as in 2014/15 only Scope 1 & 2 emissions were
calculated. For greater clarity, the Scope 1 data has been sub-divided down to
energy and transport. Scope 3 data has also been sub-divided into emissions
reported to date, and employee commuting emissions that are a new addition
to the Council’s footprint this year. The trend over time is shown visually in
Figure 1 and by sector for 2022/23 in Figure 2. 
Table 2 : Perth & Kinross Council’s Carbon Footprint (tCO2e) 
4.5 The scopes mentioned in the table above refer to:
i. Scope 1 emissions are direct emissions from sources owned or controlled
by the Council - e.g. emissions from fleet or oil-fired boilers.
ii. Scope 2 emissions are from the generation of purchased electricity.
iii. Scope 3 emissions are all other indirect emissions which relate to the Council’s
activities, including waste, homeworking, staff travel to/from work or emissions
associated with electricity which is lost in the Transmission and Distribution
system used for delivering purchased electricity.
Reporting
Year
Scope 1
Total
Scope
1
Energy
Scope 1
Transport
Scope
2
Scope
3 Total
Scope 3
sources
reported
to date
Scope 3
Employee
Commuting
Total
Footprint 
2015/16
(baseline)
9,033 9,033 Not
reported
14,676 14,995 14,995 n/a 38,705
2016/17 8,339 8,339 Not
reported
12,661 18,859 18,859 n/a 39,859
2017/18 8,593 8,593 Not
reported
9,967 19,153 19,153 n/a 37,713
2018/19 10,180 7,573 2,607 5,314 20,488 20,488 n/a 35,982
2019/20 10,722 8,038 2,684 6,823 19,560 19,560 n/a 37,105
2020/21 10,163 7,830 2,333 5,106 19,337 19,337 n/a 34,605
2021/22 10,670 8,081 2,589 5,217 20,122 20,122 n/a 36,008
2022/23 9,719 7,028 2,691 4,730 25,348 19,979 5,369 39,798
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23
Scope 1 Scope 2 Scope 3 Total Footprint
Figure 1 Perth & Kinross Council’s Carbon Footprint (tCO2e)
Page 61 of 248

Page 62

Figure 2 Perth & Kinross Council’s Carbon Footprint divided by Sector 
4.6 In 2022/23, Scope 1 emissions decreased, predominantly due to a decrease   
in emissions arising from consumption of wood chips (biomass energy). Fleet
transport emissions increased by 4% in 2022/23 compared to 2021/22.
Positively, there is a decreasing trend in Scope 2 (electricity) emissions when
comparing 2022/23 emissions to 2021/22, with emissions resulting from
electricity continuing their downwards trajectory. 
4.7 A staff travel and homeworking survey was undertaken (between 12 July 2023
– 25 September 2023) to provide an estimate of carbon emissions for Council
employees when travelling to and from work over the period of a year – with
1721 respondents (approximately 30% overall staff). Respondents were
asked to list their mode of transport when travelling to and from work, the
distance they travel and details in relation to their mode of transport e.g.
engine type and size. The responses were then analysed and scaled up to
reflect the full workforce. As a result, it is estimated that Perth & Kinross
Council staff emit 5,369 tonnes CO2e annually on their commutes to and from
work. On average, 60% of trips to and from work weekly are made by car,
while less than 10% are made by walking or cycling, and less than 5% by bus.
Additionally, less than 30% of the trips made by car are ever made by
carpooling. It is also worth mentioning that approximately 70% of trips made
by car are made within a radius of up to 5 miles from the respondent’s work
location. These results would have to be validated by further surveys to
reduce errors and identify trends. 
4.8 There was a small year-on-year decrease to the previously reported Scope 3
emissions categories – every sub-category had a very small year-on-year
decrease.  The inclusion of the staff travel results provided more detailed data
in relation to emissions arising from homeworking. Together, with a change in
methodology for the PBCCDR has resulted in a decrease in relation to
2021/22 (from 20,122 to 19,979 tCO2e).  However, inclusion of the staff travel
emissions resulted in an increase in overall Scope 3 emissions. 
Waste (Scope 3)
48%
Energy (Scopes 1, 2
& 3)
31%
Transport (Scopes
1& 3)
21%
Homeworking
(Scope 3)
0%
PERTH & KINROSS COUNCIL
EMISSIONS WITHIN SCOPES 2022/23
Waste (Scope 3) Energy (Scopes 1, 2 & 3) Transport (Scopes 1& 3) Homeworking (Scope 3)
Page 62 of 248

Page 63

4.9 In addition to the above, and as requested by the Committee in terms of
improving the Scope 3 methodology, a consultant has analysed the Council’s
procurement and finance spend data.  This is to gain a better understanding
of Scope 3 emissions arising from purchased goods and services and capital
expenditure. 
4.10 The consultant carried out an in-depth measurement of the data provided for
the past three financial years (20/21, 21/22 and 22/23). The data was
analysed to provide an assessment of the Council’s emissions broken down
by suppliers, products, categories, and Council’s services. The consultant is
currently carrying out a detailed check of the top products that will facilitate the
delivery of savings, as part of the Carbon Reduction Plan. The aim of this
analysis is to achieve cash and carbon savings through a more efficient use of
resources along with a long-term plan to engage with suppliers in becoming
more resource efficient and reducing the cost to the Council. 
4.11 The results of this analysis have not been included in this reporting year as
the analysis has not been finalised.  A briefing note for elected members will
be circulated in due course to outline findings and actions. 
4.12 The ‘investments’ category would not be included in the above analysis.
However, it is the intention to start collating information on this category,
particularly pension investments. 
4.13 Overall, although there is a decreasing trend in emissions when compared to
the emissions sources reported in 2021/22, this would need to be significantly
accelerated to reach the objectives set out in the Climate Change Strategy
and Action Plan (Report No. 21/245 refers). Furthermore, although emissions
associated with energy use decreased, emissions associated with transport
and waste have remained relatively flat and show little to no progress. 
5. CONCLUSION   
5.1 Perth & Kinross Council’s carbon footprint in 2022/23 has decreased year on
year when considering the emission sources that have been reported to date.
However, in 2022/23 the inclusion of the staff travel emissions has resulted in
an increase in reported Scope 3 emissions. As a result, the overall carbon
footprint for 2022/23 seems to have increased in comparison to the previous
reporting year. 
5.2 In achieving Perth & Kinross Council’s climate objectives, the emissions
reductions trend to date would need to be significantly accelerated to achieve
the actions related to the Council operations and functions as set out in the
Climate Change Strategy and Action Plan. However, this is highly dependent
on availability of resources. 
Page 63 of 248

Page 64

Authors
Name  Designation Contact Details
Eirini Kourtesi  Climate Change and
Sustainable
Development Officer 
01738 475000
ComCommitteeReports@pkc.gov.uk
Divindy Grant Climate Change and
Sustainable
Development Team
Leader 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
20 November 2023 
APPENDICES 
Appendix 1 - Public Bodies Climate Change Duties Report 2022/23 Submission 
Page 64 of 248

Page 65

ANNEX 
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Y
Corporate Plan  Y
Resource Implications  
Financial  N
Workforce N
Asset Management (land, property, IST) N
Assessments  
Climate Change Assessment Y
Strategic Environmental Assessment N
Sustainable Procurement & Supply Assessment N
Equality & Fairness Assessment N
Child Rights & Wellbeing Assessment N
Consultation 
Internal  Y
External  N
Communication 
Communications Plan  N 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The activities detailed in the report supports the delivery of Perth and Kinross
Community Plan/Single Outcome Agreement in terms of the following
priorities: 
(i) Reducing poverty
(ii) Physical and Mental Wellbeing 
(iii) Digital Participation 
(iv) Learning and Development
(v) Employability 
1.2 This report relates to (i) Reducing poverty. 
Page 65 of 248

Page 66

Corporate Plan 
1.3 The activities detailed in the report supports the achievement of the Council’s
Corporate Plan Priorities: 
(i) Tackling poverty 
(ii) Tackling climate change and supporting sustainable places
(iii) Developing a resilient, stronger and greener local economy 
(iv) Enabling our children and young people to achieve their full potential 
(v) Protecting and caring for our most vulnerable people
(vi) Supporting and promoting physical and mental wellbeing
(vii) Working in partnership with communities 
1.4 This report relates to (i) Tackling poverty, (ii) Tackling climate change and
supporting sustainable places and (iii) Developing a resilient, stronger and
greener local economy 
2. Resource Implications 
Financial 
2.1 There are no financial implications arising from the recommendations in the
report. 
Workforce 
2.2 There are no workforce implications arising from the recommendations in the
report. 
Asset Management (land, property, IT) 
2.3 Ther are no asset management implications arising from the recommendations
in the report. 
3. Assessments 
Climate change Assessment 
3.1 Under the Climate Change (Scotland) Act 2009, Perth & Kinross Council has
a statutory duty to report on its carbon emissions.  This report has no further
climate change implications other than those already associated with the
existing Climate Change Strategy and Action Plan. 
Equality & Fairness Assessment 
3.2 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
Page 66 of 248

Page 67

3.3 The information contained within this report has been considered under the
Corporate Equalities Impact Assessment Process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. 
Strategic Environmental Assessment 
3.4 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.5 The proposals have been considered under the Act and no action is required
as the Act does not apply to the matters presented in this report. This is
because the Committee are requested to note the contents of the report only
and the Committee are not being requested to approve, adopt or agree to an
action or to set the framework for future decisions. 
Sustainable Procurement & Supply Assessment 
3.6 Under the Procurement Reform (Scotland) Act 2014, the Council has a duty to
consider sustainable procurement as part of its procurement process. The
Council is required to consider how in conducting the procurement process it
can – (i) improve the economic, social, and environmental wellbeing of the
authority’s area, (ii) facilitate the involvement of small and medium
enterprises, third sector bodies and supported businesses in the process, and
(iii) promote innovation. 
3.7 The report does not have any impacts on sustainable procurement and
supply. 
Child Rights & Wellbeing Assessment 
3.8 The United Nations Convention on the Rights of the Child (UNCRC) was
ratified by the UK Government in 1991. It sets out the civil, political, economic,
social and cultural rights that all children, everywhere, are entitled to and is
regarded as the global “gold standard” for children’s rights. Screening for
Child Rights and Wellbeing Impacts, alongside the Getting it Right for Every
Child (GIRFEC) wellbeing indicators ensures that Council policies protect and
promote the rights and wellbeing of children and young people. 
3.9 This proposal was considered under the Council’s Impact and Value
Assessment. No impacts on Child Rights and Wellbeing were identified. 
Legal and Governance 
3.10 The Head of Legal and Governance Services has been consulted. 
Page 67 of 248

Page 68

4. Consultation 
Internal 
4.1 There has been no other internal consultation. 
2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government
(Scotland) Act 1973 (other than any containing confidential or exempt
information) were relied on to a material extent in preparing the above report.
Page 68 of 248

Page 69

Perth And Kinross Council 
Climate Change & Sustainability Committee 
27 November 2023 
LOCAL HEAT & ENERGY EFFICIENCY STRATEGY 2024-2045 
Report by Strategic Lead – Economy, Development & Planning
(Report No. 23/330) 
1. PURPOSE 
1.1 To seek approval of the first Local Heat & Energy Efficiency Strategy (LHEES)
2024-2045 and Delivery Plan (2024-2029) for Perth and Kinross to meet the
requirements of legislation and Scottish Government guidance (Appendix 1
and Appendix 2). 
2. RECOMMENDATIONS 
2.1 It is recommended that the Committee: 
(i) approves the content of the first Local Heat & Energy Efficiency
Strategy (LHEES) for the period 2024-2045 (Appendix 1).
(ii) approves the content of the LHEES 2024-2029 Delivery Plan
(Appendix 2)
(iii) approves the submission of the LHEES 2024-2045 and Delivery Plan
to the Scottish Government and publication when finalised
(iv) authorises the Executive Director (Communities) to make minor
changes to provide easy access for further engagement and reviews,
prior to publication. 
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background
• Section 5: Context
• Section 6: Preparation and Engagement
• Section 7: Local Heat & Energy Efficiency Strategy (LHEES) 2024-2045
• Section 8: Monitoring and Review
• Section 9: Conclusion  
• Appendices 
6
Page 69 of 248

Page 70

4. BACKGROUND 
4.1 Perth and Kinross Council has a statutory duty to prepare a Local Heat and
Energy Efficiency Strategy (LHEES) and update it on a 5-year basis as part of
the Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 which
came into force on 21 May 2022.  As established in the Order, LHEES should
have a two-part structure of a Strategy and Delivery Plan. 
4.2 Perth and Kinross Council must publish its first local heat and energy
efficiency strategy as well as its first local heat and energy efficiency delivery
plan on, or before, 31 December 2023. 
4.3 A local heat and energy efficiency strategy is a long-term strategic framework
for the improvement of the energy efficiency of buildings in the local
authority’s area, as well as the reduction of greenhouse gas emissions
resulting from the heating of such buildings. A delivery plan is the document
setting out how the Council proposes to support implementation of its local
heat and energy efficiency strategy. 
5. CONTEXT 
5.1 The LHEES 2024-2045 is firmly aligned to the priorities and vision of the
Corporate Plan 2022/23 – 2027/28 for a Perth and Kinross where everyone
can live life well, free from poverty and inequality. The LHEES 2024-2045
reflects the views of our communities, elected members, stakeholders, and
partner organisations. These views have helped influence the development of
the LHEES priorities and outcomes which are most important for Perth and
Kinross. They will enable Perth and Kinross Council and partners to deliver
more energy efficient homes and buildings, affordable warmth and heat
decarbonised sources. 
5.2 Mechanisms were also put in place as part of the LHEES consultation plan to
ensure the LHEES is also fully aligned with local strategies, policies and plans
including the: 
• Perth and Kinross Climate Change Strategy and Action Plan
• Perth and Kinross Local Outcomes Improvement Plan 2022-2032
• Perth and Kinross Local Development Plan 2019
• Perth and Kinross Local Housing Strategy 2022-2027
• Perth and Kinross Child Poverty Delivery Plan 2022-2026 
• Tay Cities Regional Economic Strategy 
5.3 A review of relevant national strategic documents and policies has also
informed the development of the LHEES. 
Page 70 of 248

Page 71

6. PREPARATION AND ENGAGEMENT 
6.1 In line with best practices in strategy development, engagement with our
communities and stakeholders has been the driver to design Perth and
Kinross LHEES and will be crucial for its successful delivery. We have
designed, agreed and delivered an effective engagement plan with Arup, our
external adviser. 
6.2 A project team led the development and engagement process with two project
co-leads ensuring co-ordination and day-to-day management. A cross-Council
LHEES Working group ensured that information and experience was shared
across the Council with key individuals focusing on specific areas of work. 
6.3 A stakeholder mapping was carried out to identify stakeholders. Based on the
likely level of interest and influence on the project, stakeholders have been
categorised into four groups (some examples of organisations falling into each
group are provided):  
• Tier 1 (e.g. Council’s energy team, Council’s housing capital programme
team, Distribution Network Operators, Housing Associations, NHS, Home
Energy Scotland) – Ongoing engagement throughout the project at defined
workshops e.g. identifying priorities and for delivery. Specific engagement
plans developed as required.
• Tier 2 (e.g business groups, Community energy groups, private landlords) –
Participate in workshops and engage with the project at key milestones (if
required) - Potentially one-to-one contact during data collection stage and
one-to-one interviews to be held with these stakeholders to gain further
insight and understanding of priorities and delivery contributions. 
• Tier 3 and 4 (e.g. Community Councils, SEPA, neighbouring local
authorities) – Potentially participate in workshops and engage with the
project at key milestones (ad hoc basis). Receive a direct invite to public
consultation. 
6.4 Tier 1 stakeholders were invited to form a LHEES Steering Group with
Council’s representatives and a first meeting of LHEES Steering Group took
place on 30 March 2023. The LHEES Steering Group role, remit and
membership is set out in Annex B of Appendix 1. 
6.5 The engagement plan was structured around a series of Steering Group
workshops and one-to-one interviews. Workshops’ invitations and interviews
were extended to other stakeholders’ groups when relevant to the topic. 
• Workshop 1 (March 2023): Objective settings - Knowledge building and
awareness raising for key stakeholders; establishment of ongoing
engagement opportunities and activities to support LHEES.
• Workshop 2 (May 2023): Baseline feedback and strategic options and
priorities - Scenarios to be developed for optimisation modelling and to
support finalising focus for the LHEES Strategy.
• Workshop 3 (June 2023): Heat Network Zones – identification of Heat
Network Zones and discussion.
Page 71 of 248

Page 72

• Workshop 4 (July 2023): Online modelling feedback - Prioritised
decarbonisation pathway that will be used to inform the LHEES Strategy
and Delivery Plan.
• Workshop 5 (October 2023): Draft Strategy and delivery plan - Present the
draft Strategy and Delivery Plan for discussion and feedback. 
6.6 In addition to the formal LHEES engagement, the Strategy development is
based on wider stakeholder and community engagement by PKC and our
partners.  These include: 
• PKC’s Local Housing Strategy inputs and consultation (2022);
• Big Place Conversations held across Perth & Kinross in Spring/Summer
2023;
• Net Zero Living – Pathfinder Places public engagement in Aberfeldy,
Tulloch and Blairgowrie (Spring 2023). 
6.7 A public consultation was also carried out in October 2023 and feedback has
informed the development of the LHEES. 
7. PERTH AND KINROSS LOCAL HEAT & ENERGY EFFICIENCY
STRATEGY 2024-2045 
7.1 The first Local Heat and Energy Efficiency Strategy (LHEES) covers the
period 2024-2045 and sets out the vision for heat transition and energy
efficiency in Perth and Kinross, and the outcomes required to achieve this.
The period 2024-2045 for the Strategy has been set locally with the start year
reflecting the statutory date for publication by 31 December 2023 and the end
date reflecting the overall Scottish target date of 2045 for achieving net zero
emissions. The Delivery Plan period of 2024-2029 will cover the first 5 years
of the Strategy and is line with the requirements to carry out a review every 5
years. 
7.2 Based on work with delivery partners, stakeholders and residents, the Local
Heat and Energy Efficiency Strategy vision for Perth and Kinross is that: 
“By 2045, our homes and buildings will be more energy efficient and with
more decarbonised heat sources, providing more affordable warmth and no
longer contributing to climate change”. 
7.3 The LHEES vision also places heat transition and energy efficiency at the
centre of major ambitions for Perth and Kinross. To achieve this vision and
realise the wider ambitions set out in the Corporate Plan and Local Outcomes
Improvement Plan, the following two LHEES key priorities for action have
been defined as: 
• decarbonising heat within a transitioning energy system, focusing on heat
networks and heat pumps. 
• improving buildings’ energy efficiency aiming for affordable warmth and
regulatory compliance.
Page 72 of 248

Page 73

7.4 The LHEES outcomes identified to deliver LHEES priorities have been
designed through the LHEES development process and co-produced with
partners and stakeholders from public, private and independent sectors.
LHEES outcomes would include significant reduction in carbon emissions,
affordable and sustainable heating along with health and well-being benefits. 
7.5 An evidence-based appraisal was undertaken as part of the LHEES
development process. This systematically assessed and prioritised the actions
required to deliver LHEES Outcomes in terms of impact, equalities and
maximising resources. 
7.6 The LHEES Delivery Plan 2024-2029 includes actions for delivering the
following LHEES priorities. It is important to underline that these are not
ranked in order of priorities and a ‘fabric first’ approach should always be
used. The ‘fabric first’ approach is focusing on reducing a building's heat loss
first. 
Priority 1: Decarbonising heat within a transitioning energy system
focusing on heat networks and heat pumps.
P1.a Delivering decarbonised heat within a transitioning energy system –
Heat Network Zones:
The identified Heat Network zones include:
• Perth City Centre (Very likely to be more suitable)
• Perth Inveralmond Industrial Estate (Very likely to be more suitable) 
• Perth College/UHI (Likely to be suitable)
• Perth Academy (Likely to be suitable)
• Auchterarder (Likely to be suitable)
• Kinross (Likely to be suitable)
• Blairgowrie (Likely to be suitable)
P1.b Delivering decarbonised heat within a transitioning energy system -
Heat Pumps focusing on:
• Off-gas social housing energy efficiency Category 1 highly suitable
for a heat pump installation (Category 1 are properties which are
well insulated property with a wet system) 
• Off-gas private homes suitable for heat pump retrofit
• Social housing that requires energy efficiency improvements to
enable suitability for heat pumps
Priority 2: Improving buildings’ energy efficiency aiming for affordable
warmth and regulatory compliance.
P2.a Improving buildings’ energy efficiency to meet regulatory standards,
focusing on 
• areas with concentrations of social housing having poorer energy
efficiency (below EPC B) and low costs of intervention.
• areas where substantial energy and CO2 emissions savings can be
achieved for privately owned homes (below EPC C) if cost
effectiveness could be achieved when combined with the areas
above.
• areas with high potential for heat demand savings in non-domestic
buildings with lower cost retrofit interventions.
Page 73 of 248

Page 74

Regulatory targets for energy efficiency are: 
• By 2026 All Social Housing EPC D and EPC B by 2032
• By 2028 Private Rented Sector EPC C
• By 2033, all homes have the equivalent of EPC C.
P2.b Improving buildings’ energy efficiency aiming for affordable warmth,
focusing on 
• areas where poor energy efficiency is the highest and acts as a
driver of fuel poverty, particularly if low cost retrofit options are
possible.
• areas where social housing is likely to experience a greater
reduction in fuel poverty due to low cost retrofit measures. 
7.7 The delivery of the LHEES key priorities will also be supported by the
following mechanisms: 
• taking a Whole Energy Systems Approach: Through the development of
the Local Area Energy Planning (LAEP) and a collection of
complementary initiatives, the Council is taking a whole systems energy
approach to the development and implementation of the LHEES from
generation through to demand. This would include data and scenarios
building tools and platforms, the Council’s estate decarbonisation
programme and business case development toolkit to develop an
investment programme enabling Smart Local Energy Systems. 
• Developing green skills and the capacity of the supply chain: There is a
need to assess skills provision and support providers as well as the local
supply chain to meet the demand arising from heat transition and energy
efficiency works, operations and maintenance. 
• Working in partnership with communities to build community wealth and
wellbeing: Communities could take advantage of heat transition and
energy efficiency opportunities as well as build community wealth and
wellbeing by developing local solutions which are locally shared and
owned. 
• Mobilising partners and public and private investments for projects: There
is a need, with other local public partners, to evaluate a possible Strategic
Energy Partnership to unlock delivery of, though potentially not limited to,
heat networks and to improve delivery capability into large and complex
energy-related projects. 
Page 74 of 248

Page 75

7.8 The LHEES sets out the key targets in relation to housing stock, fuel poverty
and heat, and decarbonisation. The Perth and Kinross LHEES targets have
been aligned with the Scottish targets and will be used to measure progress in
the Delivery Plan (2024-2029) and subsequent plans. However, it is
recognised that these targets will be very challenging if no significant public
and private investments are made available or come forward. Behaviours
would also need to change to make the best use of technologies. This would
be particularly the case for private households, and small and medium
businesses. This is also reflected in the Delivery Plan as funding sources,
where needed, will have to be identified. 
7.9 The Delivery Plan also includes governance arrangements including a LHEES
co-ordination team, the creation of a risk register and the development of a
communication and engagement plan. 
8. MONITORING AND REVIEW 
8.1 Actions will be implemented through the Local Heat & Energy Efficiency
Strategy (LHEES) Steering Group and by operational teams. The LHEES
Steering Group will build on the strong partnerships already in place,
recognising that achieving LHEES priorities will require a collective effort from
all delivery partners, stakeholders, communities, and residents of Perth and
Kinross. 
8.2 Delivery Plan progress updates will be prepared for the Council’s Climate
Change Board meetings and for the Committee on an annual basis with a
review of the LHEES every five years. 
8.3 A LHEES co-ordination team would be established with officers dedicating all
or part of their time. Allocated LHEES funding from the Scottish Government
(75K/year over 2024/25, 2025/26 and 2026/27) will be used to support and
strengthen the LHEES coordination and overall delivery. The co-ordination
team will support the LHEES Steering Group. 
8.4 A Communication and Engagement Plan will be developed by the Steering
Group and has been included as one of the early actions of the Delivery Plan.
The Communication and Engagement Plan will set out how the Steering
Group will conduct regular consultation and engagement with stakeholders.
Engagement with residents, communities, businesses and private landlords
would be particularly important to ensure they are at the core of the delivery to
reduce barriers and optimise benefits. It will also ensure there is awareness of
the key heat transition and energy efficiency priorities for Perth and Kinross
until 2029. 
8.5  If approved, the format of the draft LHEES Strategy and Delivery Plan
attached in Appendix 1 and 2 will be finalised to allow publication and to
provide easy access for further engagement and reviews. 
Page 75 of 248

Page 76

9. CONCLUSION 
9.1 The report outlines the content of the Local Heat & Energy Efficiency Strategy
(LHEES) 2024-2045 (Appendix 1) and LHEES Delivery Plan 2024-2029
(Appendix 2). 
Authors 
Name  Designation Contact Details
Shelley McCann Climate Change –
Strategic Planning &
Sustainability Officer 
(01738) 475000
ComCommitteeReports@pkc.gov.uk 
Serge Merone Climate Change &
Smart Investment
Manager 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities)
20 September 2023 
APPENDICES 
• Appendix 1 – Local Heat & Energy Efficiency Strategy (LHEES) 2024-2045 
• Appendix 2 – LHEES Delivery Plan 2024-2029 
Page 76 of 248

Page 77

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) Yes
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment None
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications  
Community Plan/Single Outcome Agreement 
1.1 The activities detailed in the report supports the delivery of Perth and Kinross
Community Plan/Single Outcome Agreement in terms of the following
priorities: 
(i) Giving every child the best start in life; 
(ii) Developing educated, responsible, and informed citizens; 
(iii) Promoting a prosperous, inclusive, and sustainable economy; 
(iv) Supporting people to lead independent, healthy, and active lives; and 
(v) Creating a safe and sustainable place for future generations. 
1.2 This report relates to all priorities. 
Corporate Plan 
1.3 The activities detailed in the report supports the achievement of the Council’s
Corporate Plan Priorities: 
(i) Giving every child the best start in life; 
(ii) Developing educated, responsible, and informed citizens; 
(iii) Promoting a prosperous, inclusive, and sustainable economy; 
(iv) Supporting people to lead independent, healthy, and active lives; and 
(v) Creating a safe and sustainable place for future generations.
Page 77 of 248

Page 78

1.4 This report relates to all priorities. 
2. Resource Implications 
Financial 
2.1 Financial implications arising directly from this report emanate from the local
authority domestic and non-domestic decarbonisation programme. Funding
from the Scottish Government, other public bodies and private finance will
apply in relation to particular actions. Allocated LHEES funding from the
Scottish Government (75K/year over 2024/25, 2025/26 and 2026/27) will be
used to support and strengthen the LHEES coordination and overall delivery. 
Workforce 
2.2 There are no workforce implications arising from the recommendations in the
report. However, allocated LHEES funding from the Scottish Government may
be used to create new posts if required. 
Asset Management (land, property, IT) 
2.3 The asset implications of this report relate to the local authority domestic and
non-domestic decarbonisation programme and the use of land or other assets
in Council’s ownership. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups. Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
3.2 The information contained within this report has been considered under the 
Corporate Equalities Impact Assessment Process (EqIA) and has been
assessed as not relevant for the purposes of EqIA. However, it is anticipated
that the LHEES outcomes would benefit positively all age groups and people
with a disability.
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The proposals have been considered under the Act. Having consulted the
three consultation authorities and having considered the criteria set out in the
Act, the Council considers that the LHEES Strategy & Delivery Plan is unlikely
to have significant (negative) environmental effects. The Council has therefore
determined that SEA is not required.
Page 78 of 248

Page 79

Sustainability 
3.5 Under the provisions of the Local Government in Scotland Act 2003 the
Council must discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009, the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.6 The information contained within this report has been considered against the
Council’s Principles for Sustainable Development and the report aims to
ensure compliance with the reporting requirements under the Acts. 
Legal and Governance 
3.7 The Head of Legal and Governance has been consulted and there are no
direct legal implications in this report. 
Risks 
3.8 Risks associated with the delivery of LHEES actions are covered within the
LHEES Delivery Plan.  A Risk register will be developed and has been
included as one of the early actions of the Delivery Plan. 
Communication 
3.9 The decisions from the report will be communicated to stakeholders and the
press through the media team. A Communication Plan will be developed by the
Steering Group and has been included as one of the early actions of the Delivery
Plan. 
4. Consultation 
Internal 
4.1 There has been internal consultation with Heads of Service and Service
Managers through Climate Change Board and LHEES working group. 
External 
4.2 Consultation with a range of stakeholders, including residents and groups
progressed through online and in person external meetings between January
2023 and November 2023. 
Page 79 of 248

Page 80

2. BACKGROUND PAPERS 
2.1 No background papers, as defined by Section 50D of the Local Government 
(Scotland) Act 1973 (other than any containing confidential or exempt 
information) were relied on to a material extent in preparing the above report. 
Page 80 of 248

Page 81

LHEES Strategy 2024-2045  November 2023
Appendix 1 
Perth and Kinross 
Local Heat & Energy Efficiency
Strategy 
2024-2045 
DRAFT 
Perth & Kinross Council
November 2023
6
Page 81 of 248

Page 82

2
LHEES Strategy 2024-2045  November 2023
Contents
1. FOREWORD..................................................................................................................................... 5
2. EXECUTIVE SUMMARY.................................................................................................................... 7
3. INTRODUCTION ............................................................................................................................ 10
4. WHAT IS A LHEES? ........................................................................................................................ 11
5. POLICY AND STRATEGY CONTEXT ................................................................................................ 13
5.1 National and UK Context ............................................................................................................ 13
5.2 Perth and Kinross Context .......................................................................................................... 22
6. PERTH AND KINROSS BASELINE .................................................................................................... 24
6.1 Domestic baseline ...................................................................................................................... 24
Poor energy efficiency .................................................................................................................. 25
Fuel Type ...................................................................................................................................... 25
Fuel poverty .................................................................................................................................. 26
6.2 Non-domestic baseline ............................................................................................................... 28
7. VISION, OUTCOMES AND TARGETS .............................................................................................. 32
7.1 LHEES Vision ............................................................................................................................... 32
7.2 LHEES Outcomes......................................................................................................................... 32
7.3 LHEES targets .............................................................................................................................. 33
8. LOCAL CHALLENGES AND OPPORTUNITIES .................................................................................. 36
8.1 Barriers and Challenges .............................................................................................................. 36
Physical building stock .................................................................................................................. 36
Affordability and tenure ............................................................................................................... 37
Funding ......................................................................................................................................... 37
Public awareness and buy-in ........................................................................................................ 37
Skills and supply chain .................................................................................................................. 38
Lack of regulation and misalignment of national targets ............................................................ 38
Grid capacity ................................................................................................................................. 39
Data availability ............................................................................................................................ 39
Page 82 of 248

Page 83

3
LHEES Strategy 2024-2045  November 2023
8.2 Opportunities ............................................................................................................................. 40
Use of natural assets, waste heat and new technologies ............................................................ 40
Hydrogen ...................................................................................................................................... 40
Green jobs and building a green economy .................................................................................. 40
Financing ...................................................................................................................................... 41
Public-Private Collaboration ......................................................................................................... 41
Co-benefits ................................................................................................................................... 41
9. ENGAGEMENT AND CONSULTATION ........................................................................................... 42
9.1 Engagement in strategy development ....................................................................................... 42
9.2 Outputs of community consultation .......................................................................................... 44
9.3 Impact Assessments ................................................................................................................... 46
10. STRATEGIC PRIORITIES .............................................................................................................. 47
10.1 LHEES Priorities......................................................................................................................... 47
10.2 Strategic Zoning ........................................................................................................................ 48
10.3 Strategic vs Delivery zoning for priorities ................................................................................ 49
10.4 Strategic Priority 1a: “Delivering decarbonised heat within a transitioning energy system –
Heat Network Zones” ....................................................................................................................... 50
Approach for Identifying Potential Heat Network Zones............................................................. 50
Potential Heat Network Zones ..................................................................................................... 51
Perth City Centre Heat Network .................................................................................................. 57
Blairgowrie, Kinross and Auchterarder Potential Heat Networks ............................................... 57
10.5 Strategic Priority 1b: “Delivering decarbonised heat within a transitioning energy system -
Heat Pumps” ..................................................................................................................................... 58
Off-gas social housing energy efficiency Category 1 suitable for heat pump .............................. 59
Off-gas private homes suitable for heat pump retrofit ............................................................... 59
Social housing that requires energy efficiency improvements to enable suitability for heat
pumps ........................................................................................................................................... 60
10.6 Strategic Priority 2a: “Improving buildings’ energy efficiency to meet regulatory standards”
.......................................................................................................................................................... 60
Page 83 of 248

Page 84

4
LHEES Strategy 2024-2045  November 2023
Non-domestic buildings that require retrofit to meet regulatory targets ................................... 62
10.7 Strategic Priority 2b: “Improving buildings’ energy efficiency aiming for affordable warmth”
.......................................................................................................................................................... 62
11. DELIVERY PLAN .......................................................................................................................... 64
11.1 Delivery Plan Priorities ............................................................................................................. 64
11.2 Delivery Plan Area Criteria ....................................................................................................... 66
11.3 LHEES/LAEP Live Delivery Plan ................................................................................................. 67
11.4 Key supporting delivery mechanisms ....................................................................................... 68
Taking a Whole Energy Systems Approach .................................................................................. 68
Developing green skills and the capacity of the supply chain ..................................................... 69
Working in partnership with communities to build community wealth and wellbeing .............. 71
Mobilising partners and public and private investments for projects ......................................... 72
12. GOVERNANCE AND MONITORING ............................................................................................ 74
12.1 Governance .............................................................................................................................. 74
12.2 Monitoring ................................................................................................................................ 75
13. GLOSSARY .................................................................................................................................. 76
13.1 Abbreviations ........................................................................................................................... 76
13.2 Terms ........................................................................................................................................ 77
14. APPENDICES ............................................................................................................................... 80 
Page 84 of 248

Page 85

5 
LHEES Strategy 2024-2045  November 2023
1. FOREWORD
I am delighted to introduce Perth and Kinross Council’s first Local Heat & Energy
Efficiency Strategy (LHEES) which sets our ambitions until 2045. This Strategy and
accompanying 5-year Delivery Plan (2024-2029) detail our approach to improve Perth and
Kinross buildings’ energy efficiency and to decarbonise heat in a fair and just way within a
changing energy system. 
Energy Efficiency and heat decarbonisation are core elements of the energy transition to
Net Zero by 2045 tackling climate and biodiversity emergencies. To achieve this means all
building owners in Perth and Kinross will need to do their part to cut their emissions. This
strategy details how we as a Council area will approach this challenge. 
Our ambitions for Perth and Kinross are reflected across two strategic priorities and
multiple actions. These focus on identifying, prioritising, and delivering measures to
improve buildings’ energy efficiency, and where this is not possible to make a commitment
to complete further research. 
For a successful transition, our LHEES also emphasises the need for a just transition to
Net Zero. This includes actions focussing on tackling fuel poverty by aiming to improve
energy efficiency to reduce fuel bills; developing a resilient, stronger, and greener economy
with green skills and jobs; working in partnership with communities to build community
wealth and wellbeing from heat transition and mobilising partners and private and public
investment to drive the heat transition to low and zero emissions heating. 
We also want to create from the LHEES process the foundations for a more decentralised
and self-sufficient energy system for our area. We have seen the consequences of not
being self-reliant on energy as a result of global events and the spike in gas prices that
has had an impact on everyone’s energy bills. There is a commitment from UK, Scottish
and local governments to increase our energy security so that this can’t happen again. 
This Strategy was informed by developing a rigorous evidence-base and through
engagement with partners across Perth and Kinross and beyond. Ongoing collaboration,
including sharing of knowledge, data, and innovations has been key to the development of
Perth and Kinross’s LHEES and will be key to its successful delivery. 
Page 85 of 248

Page 86

6 
LHEES Strategy 2024-2045  November 2023
With over half of Scottish energy demand in 2020 being for heating purposes, everyone in
Perth and Kinross will either help support and deliver LHEES through improving their
homes and businesses; or experience the benefits of these measures by having more
energy efficient homes and workplaces with low or zero emissions heating. 
I would like to thank everybody for their participation in developing the Strategy and its
future delivery. 
Cllr Richard Watters
Convener of Climate Change and Sustainability Committee 
Page 86 of 248

Page 87

7 
LHEES Strategy 2024-2045  November 2023
2. EXECUTIVE SUMMARY
Perth and Kinross Council has a statutory duty to prepare a Local Heat and Energy
Efficiency Strategy and update it on a 5-year basis as part of the Local Heat and Energy
Efficiency Strategies (Scotland) Order 2022 which came into force on 21 May 2022.  As
established in the Order, LHEES should have a two-part structure of a Strategy and
Delivery Plan. 
A Local Heat and Energy Efficiency Strategy is a long-term strategic framework for the
improvement of the energy efficiency of buildings in the local authority’s area, and the
reduction of greenhouse gas emissions resulting from the heating of such buildings. A
delivery plan is a document setting out how a local authority proposes to support
implementation of its local heat and energy efficiency strategy. 
The first Perth and Kinross Local Heat and Energy Efficiency Strategy (LHEES) (2024-
2045) and accompanying 5-year Delivery Plan (2024-2029) is firmly aligned to the priorities
and vision of the Council and its partners for a Perth and Kinross where everyone can
live life well, free from poverty and inequality. 
The LHEES 2024-2045 reflects the views of our communities, elected members,
stakeholders, and partner organisations. These views have helped influence the
development of the LHEES priorities and outcomes which are most important for Perth and
Kinross. They will enable Perth and Kinross Council and partners to deliver more energy
efficient homes and buildings, affordable warmth and heat decarbonised sources. 
The LHEES vision for Perth and Kinross is that “by 2045, our homes and buildings will be
more energy efficient and with more decarbonised heat sources providing more affordable
warmth and no longer contributing to climate change”. This will lead to the outcomes of
significant reduction in carbon emissions, affordable and sustainable heating and health
and well-being benefits. 
The LHEES targets are aligned with the Scottish Targets and will be used to measure
progress in the Delivery Plan (2024-2029) and subsequent plans. However, it is recognised
that these targets would be very challenging if no significant public and private investments
are made available or come forward as well as if behaviours are not changing. This would
be particularly the case for private households and small and medium businesses. 
Page 87 of 248

Page 88

8 
LHEES Strategy 2024-2045  November 2023
To support the LHEES vision and outcomes, the Strategy focus on two Strategic Priorities: 
•  Decarbonising heat within a transitioning energy system focusing on heat networks
and heat pumps.
•  Improving buildings’ energy efficiency aiming for affordable warmth and regulatory
compliance. 
These are broken down into the following delivery priorities: 
- Delivering decarbonised heat within a transitioning energy system through Heat
Network Zones which would include Perth City Centre, Perth Inveralmond Industrial
Estate, Perth College/UHI, Perth Academy, Auchterarder, Kinross and Blairgowrie. 
- Delivering decarbonised heat within a transitioning energy system - Heat Pumps
focusing on off-gas social housing energy efficiency Category 1 highly suitable for a
heat pump installation (i.e. well insulated property with a wet system), off-gas
private homes suitable for heat pump retrofit and social housing that requires
energy efficiency improvements to enable suitability for heat pumps. 
- Improving buildings’ energy efficiency to meet regulatory standards in
o areas with concentrations of social housing having poorer energy efficiency
(below EPC B) and low costs of intervention, 
o areas where substantial energy and CO2 emissions savings can be achieved
for privately owned homes (below EPC C) if cost effectiveness could be
achieved when combined with the areas above and 
o areas with high potential for heat demand savings in non-domestic buildings
with lower cost retrofit interventions. 
- Improving buildings’ energy efficiency aiming for affordable warmth in areas where
poor energy efficiency is the highest and acts as a driver of fuel poverty,
particularly if low cost retrofit options are possible and areas where social housing
is likely to experience a greater reduction in fuel poverty due to low cost retrofit
measures. 
Page 88 of 248

Page 89

9 
LHEES Strategy 2024-2045  November 2023
The delivery of the LHEES priorities will also be supported by the following
mechanisms: 
- Taking a Whole Energy Systems Approach: Through the development of the Local
Area Energy Planning (LAEP) and a collection of complementary initiatives, the
Council is taking a whole systems energy approach to the development and
implementation of the LHEES from generation through to demand. This would
include data and scenarios building tools and platforms, Council’s Estate
decarbonisation programme and business case development toolkit to develop an
investment programme enabling Smart Local Energy Systems. 
- Developing green skills and the capacity of the supply chain. 
- Working in partnership with communities to build community wealth and wellbeing. 
- Mobilising partners and public and private investments for projects including through
a possible Strategic Energy Partnership to unlock delivery of, though potentially not
limited to, heat networks.  
Page 89 of 248

Page 90

10 
LHEES Strategy 2024-2045  November 2023
3. INTRODUCTION
Perth and Kinross Council has declared Climate Change and Biodiversity emergencies. A
Climate Change Strategy and Action Plan have been approved and all partners are
mobilised to implement agreed actions. Heat decarbonisation and improving energy
efficiency are at the centre of our efforts to achieve net zero by 2045. 
As established in the Local Heat and Energy Efficiency Strategies (Scotland) Order 2022,
Perth and Kinross Council has a duty to prepare a Perth and Kinross Local Heat and
Energy Efficiency Strategy (LHEES). 
Perth and Kinross LHEES is at the heart of a place based, locally-led and tailored
approach to the heat transition. Our ambition is to use it to develop a whole energy
planning approach going beyond heat and energy efficiency to include transport
decarbonisation, local renewable energy generation, energy storage, demand-side flexibility
and networks. 
This document presents the first Perth and Kinross Local Heat and Energy Efficiency
Strategy (LHEES) (2024-2045) and accompanying 5-year Delivery Plan (2024-2029). Firstly,
it presents what a LHEES and provides policy and strategy context and baseline for Perth
and Kinross domestic and non-domestic buildings.  Then, it details our vision, outcomes
and targets and presents our local challenges and opportunities and our engagement and
consultation process. Finally, it details our strategic priorities, deliver plan and governance
and monitoring arrangements. 
Page 90 of 248

Page 91

11
LHEES Strategy 2024-2045  November 2023
4. WHAT IS A LHEES?
A LHEES focuses on transforming and reducing the demand for heat and energy.
LHEES are at the heart of a place based, locally led and tailored approach to the heat
transition. These local strategies will underpin an area-based approach to heat and energy
efficiency planning and delivery. Scottish Local Authorities have a statutory duty to prepare
LHEES and update them on a 5-year basis.
A LHEES should have a two-part structure of a Strategy and Delivery Plan. Perth and
Kinross LHEES Strategy will:
• set out how each segment of the building stock needs to change to meet
national and local objectives, including achieving zero greenhouse gas emissions
in the building sector, and the removal of poor energy efficiency as a driver of
fuel poverty. 
• identify strategic heat decarbonisation zones, and set out the principal measures
for reducing buildings emissions within each zone; and  
• prioritise areas for delivery, against national and local priorities. 
National guidance frames the Strategy around six considerations which have shaped our
development of strategic and delivery priorities, as shown in Table 1.
Table 1 National LHEES considerations
LHEES Considerations
Heat decarbonisation Off-gas grid buildings
On-gas grid buildings
Heat networks
Energy efficiency and
other outcomes
Poor building energy efficiency
Poor building energy efficiency as a driver for fuel poverty
Mixed-tenure, mixed-use and historic buildings
Page 91 of 248

Page 92

12
LHEES Strategy 2024-2045  November 2023
Recognising the need for compatibility with the wider energy system, Perth and Kinross
Council is developing a Local Area Energy Plan (LAEP). The relationship between the
LHEES and LAEP is shown in Figure 1. The LAEP will support collaboration with network
operators, and other key stakeholders, to inform the development of targets as well as
deliverable actions within a net zero energy system that balances out energy generation,
transmission, storage and usage, including heat, at a substation area and Council wide
scale, through to 2045.
Figure 1 Overview of LHEES and LAEP
Alongside this, the Council is working to prepare a Council Estate Decarbonisation Plan for
its own building stock. The Council is also developing a toolkit that will assess LHEES
and LAEP delivery actions and areas to develop a pipeline of investable energy projects to
inform Smart Local Energy Systems (SLES).  These aligned programmes of work will
support the delivery of our LHEES and are further explored in the Delivery Plan section.                                     
Page 92 of 248

Page 93

13 
LHEES Strategy 2024-2045  November 2023
5. POLICY AND STRATEGY CONTEXT
5.1 National and UK Context
This section summarises the national and UK level strategies and legislations that set out
the key drivers behind LHEES.
Climate Change Plan Update (2018-2032)
This update to Scotland's 2018-2032 Climate Change Plan sets out the
Scottish Government's pathway to the new and ambitious targets set by the Climate
Change Act 2019. The main target is that by 2045, Scotland will be net-zero.
Furthermore, by 2032:
• 35% of heat for domestic buildings will be supplied using low
carbon technologies, where technically feasible, and all buildings (residential
and non-domestic) will be insulated to the maximum appropriate level.
• 70% of heat and cooling for non-domestic buildings will be supplied using
low carbon heat technologies. 
• Improvements to the building fabric of Scotland’s buildings will result in a
15% reduction in residential and 20% in non-residential heat demand. 
Key outcomes relevant to the LHEES are shown in the table below:
Action Number/
Reference
Action
Buildings – Outcome 1 The heat supply to our homes and non-domestic
buildings is very substantially decarbonised, with high
penetration rates of renewable and zero emissions
heating 
Buildings– Outcome 2 Our homes and buildings are highly energy efficient,
with all buildings upgraded where it is appropriate to do
so, and new buildings achieving ultra-high levels of
fabric efficiency
Page 93 of 248

Page 94

14 
LHEES Strategy 2024-2045  November 2023
Buildings – Outcome 3 Our gas network supplies an increasing proportion of
green gas (hydrogen and biomethane) and is made
ready for a fully decarbonised gas future
Buildings – Outcome 4 The heat transition is fair, leaving no-one behind and
stimulates employment opportunities as part of the
green recovery. 
Heat in Buildings Strategy (2021)
The Heat in Buildings (HiB) Strategy sets out the Scottish Government’s vision for the
future of heat in buildings, and the actions they are taking in the buildings sector to
deliver climate change commitments, maximise economic opportunities, and ensure a just
transition, including helping address fuel poverty. 
The key targets are as follows: 
• Majority of buildings should achieve a good level of energy efficiency by
2030 and all homes should meet an EPC band C standard by 2033. 
• All social housing to meet EPC B, or be as energy efficient as
practically possible, by the end of 2032; all private rented sector properties
to reach a minimum standard of EPC C by 2028 where technically feasible
and cost effective. 
• A 68% reduction in emissions from heat in buildings by 2030 (relative to
2020 levels).
The HiB Strategy sets out the aspirations for LHEES, in particular to:
• Support local community and wider national infrastructure issues
• Act as an investment prospectus at national and local level, guiding
delivery programmes, and signalling potential areas of investment to market
actors.
Page 94 of 248

Page 95

15 
LHEES Strategy 2024-2045  November 2023
• Support planning for the energy networks and over time will become
an important evidence base for both the electricity Distribution Network
Operators (DNOs) and Gas Distribution Network (GDN).
• Local public engagement, awareness raising and involvement in decision making
• Supporting area based regulation
The HiB Strategy sets out the ambition for regulation in Scotland for heat decarbonisation
and energy efficiency performance.
Heat Networks (Scotland) Act 2021 and Heat Networks Delivery Plan
The Act aims to accelerate the deployment of heat networks in Scotland through
the introduction of a regulatory system aimed at boosting consumer confidence in
the sector and providing greater certainty for investors. This Act supports the growth
of heat networks through a number of initiatives including ensuring that heat networks are
developed in appropriate areas to maximise investor benefits and drive prices down for
users and ensuring local communities are aware of developments which can support future
users for heat networks. Targets include 2.6 TWh of heat to be supplied by heat networks
by 2027 and 6 TWh by 2030. 
The Act focuses on regulating the construction and operation of a heat network; making
provisions about the powers of persons holding a heat networks licence; making provisions
about conferring rights in heat network assets where a licence holder ceases operations;
and for connecting purposes. The Heat Networks Delivery Plan sets out how the provision
in the Act will be used to accelerate the deployment of heat networks in line with national
targets. 
Section 47 of the Heat Networks (Scotland) Act places a duty on local authorities to carry
out a review to consider whether one or more areas in its area is likely to be particularly
suitable for the construction and operation of a heat network. The LHEES Methodology
sets out an approach to support local authorities to discharge this duty. This Methodology
has been followed when preparing the Council’s LHEES. In carrying out a review under
Section 47(1), a local authority must have regard to the matters mentioned in Section
48(1).  Heat Network Zones (designated by Local Authorities as per regulatory
requirement) will be put out to a competitive tender process whereby operators who have
Page 95 of 248

Page 96

16 
LHEES Strategy 2024-2045  November 2023
first gained a licence and project-specific consent will bid for a zone permit (likely granting
exclusivity to operate over a long-term period though this is yet be clarified). The
secondary legislation is currently in development and will clarify the scope of the Act and
how operators and public sector bodies will interact with it. A summary of the key
provisions in the Act is included below:
Heat Network Act theme Description
Heat Networks Licence Prospective heat network operators will
have to first obtain this licence with the
intention of ensuring that market
participants are solvent, competent, fit
and proper and can provide their
essential service in line with conditions
set by a Licensing Authority, with
ongoing monitoring and enforcement
where necessary. This, in turn, will
provide assurances to both consumers
and investors in deciding whether to
become involved in the sector
Heat Network Consents The requirement to attain project-
specific consent will ensure that projects
are vetted to assess how they will
contribute to targets on emissions
reduction or fuel poverty. Heat network
operators will have to obtain this
consent if they are to progress with any
prospective heat network project in
Scotland. The consenting authority
would most likely be Scottish Ministers
due to the risk of self-regulation if local
authorities were to take on this
responsibility.
Page 96 of 248

Page 97

17 
LHEES Strategy 2024-2045  November 2023
Heat Network Permits Heat networks are in-effect mini grids,
isolated from the wider gas grid. This
means that operators do not have the
same floating customer base in which
to recover their costs from that gas and
electricity operators benefit from.
Granting operators long-term permits
seeks to mitigate against this by
providing a natural monopoly following a
competitive tender process. The
guarantee that operators will have
exclusivity within a designated Heat
Network Zone will provide certainty of a
steady return on investment. Giving
operators confidence that they will be
able to recover their costs over a long
period of time increases the commercial
viability of a heat network. This
confidence will allow investors to target
more ambitious projects. It is not yet
clear what the permitting element of the
Heat Networks Act will mean for
operators and the Council will continue
to engage with the Scottish Government
on the development of secondary
legislation for the Act.
Heat Network Zones To fully maximise the benefits of a heat
network, strategic planning is required
to identify zones that have the most
potential. This zone-specific approach
allows buildings with significant heat
demands (anchor loads) to be identified,
Page 97 of 248

Page 98

18 
LHEES Strategy 2024-2045  November 2023
along with possibilities to utilise
renewable sources for the supply. The
requirement to identify and legally
designate heat networks zones by local
authorities will provide an informed
evidence base which will enable long-
term planning around where a heat
network is commercially attractive and
how they can advance key strategic
goals around decarbonisation and fuel
poverty. This provision of the Act has
now come into force and more
information can be accessed here
Building Assessment Reports (BARs) This puts a duty on the public sector to
assess their estate for suitable heat
network connection. This will provide
clarity on heat demand alongside
connection suitability from an
architecture perspective. Whilst this only
applies to the public sector at present,
this may extend to all non-domestic
buildings in the future. His provision of
the Act has now come into force.
Powers of Licence Holders This aspect of the Act will equip heat
network licence holders with statutory
undertaking powers. Operators will have
similar wayleave and access rights
granted to other utility providers. Such
rights can be in relation to compulsory
acquisition of land, wayleaves, survey
works, and access to carry out work.
Page 98 of 248

Page 99

19 
LHEES Strategy 2024-2045  November 2023
This aims to reduce capital costs
connected to construction and the
associated delays often suffered. The
Scottish Government are currently
considering whether to extend this right
to the road network, something that
conventional utilities have rights over.
Network wayleave rights will also be
granted to operators. This will enable
operators to request from the Scottish
Ministers the right to install pipework
and other apparatus up to any building.
The building owners will be under no
obligation to connect, but the ability to
connect in the first place will provide
operators with a higher degree of
confidence in future asset connection.
Heat Networks Assets Schedule and
Transfer Regime
This element of the Act requires heat
networks to have a scheme in place to
transfer operational rights to a third
party to ensure sustained supply, if and
when needed. 
Fuel Poverty (Targets Definition and Strategy) (Scotland) Act 2019. 
The Act sets out a new target relating to the eradication of fuel poverty, as well
as providing a revised definition of fuel poverty. By 2040: no more than 5% of households
in Scotland are in fuel poverty; no more than 1% of households in Scotland are in
extreme fuel poverty. 
LHEES should be primarily driven by Scotland’s statutory targets for greenhouse gas
emissions reduction and fuel poverty. The LHEES Strategy and Delivery Plan should
Page 99 of 248

Page 100

20 
LHEES Strategy 2024-2045  November 2023
therefore seek to implement actions and delivery that support fuel poverty alleviation. It
should be noted though, that the LHEES Consideration only covers fuel poverty driven by
poor energy efficiency.
Scottish Energy Strategy & Just Transition Plan (Scottish Government) 
Published in January 2023 this sets out how Scotland will meet the challenge of reducing
demand within main energy-using sectors such as heat in buildings, transport, industry and
agriculture whilst using energy more efficiently, and becoming largely decarbonised by
2030. The Strategy identifies the requirement of significant investment to fund the transition
and suggests a financing policy model that will seek to leverage private sector investment
to support public investment. The Plan is currently under consultation.
Housing to 2040 (Scottish Government)
Housing to 2040 sets out a vision for housing in Scotland to 2040 and a route map to get
there. It aims to deliver an ambition for everyone to have a safe, good quality and
affordable home that meets their needs in the place they want to be. This will inevitably
include affordable low carbon heating systems.
National Planning Framework (NPF4) (Scottish Government) 
Published in February 2023, The National Planning Framework 4 (NPF4) sets the context
for development planning in Scotland and provides a framework for the spatial
development of Scotland as a whole. It is a statutory document and all planning
applications must consider the policy implications of NPF4. NPF4 requires that Local
Development Plans take into account the area’s LHEES and that the spatial strategy
should take into account areas of heat network potential and any designated Heat Network
Zones. Policy 19 sets out the development management considerations which will facilitate
and enable new developments to incorporate and promote LHEES. 
NPF4 will be a key influence on the revised Local Development Plan (LDP) for Perth &
Kinross and will stipulate how planning policy can be used at local level towards the
achievement of strategic goals. LHEES and the LDP should incentivise developers to
switch to communal heating systems or connect to a larger district heating scheme,
particularly in designated Heat Network Zones. NPF4 will also place greater emphasis on
the environment and sustainability against aspects relating to heritage protection. 
Page 100 of 248

Page 101

21 
LHEES Strategy 2024-2045  November 2023
New Build Heat Standard (forthcoming)
From 1 April 2024, new buildings in Scotland applying for a building warrant will be
required to use zero direct emissions heating systems (ZDEH) to meet their space and hot
water heating and cooling demands. This will include systems such as heat pumps and
heat networks. The Council will need to incorporate these requirements into the next Local
Development Plan to incentivise heat network connection where practical and feasible.
Hydrogen Policy Statement (2020) (Scottish Government)
This sets out the vision for Scotland to become a leading hydrogen nation in the
production of reliable, competitive, sustainable hydrogen.  Whilst hydrogen is not likely to
be widely used as a fuel source for district heating, it is being introduced in a pilot
scheme to 300 premises in Fife as part of a H100 trial project to promote renewable
energy generated hydrogen for heating and cooking.
Tenements (Scotland) Act 2004 
A Tenement Management Scheme, is outlined in Schedule 1 of the Tenements (Scotland)
Act 2004, lists the ‘scheme property’ (explaining what parts for the tenement every flat
owner should maintain) and explains how to come to arrangements about maintenance
(‘scheme decisions’) and how costs are shared between owners. The Climate Change
(Scotland) Act 2009 amends the Tenement Management Scheme to log insulation
installation as a maintenance measure rather than an ‘improvement’ so changes can be
approved via a majority rather than unanimously.  Tenements (and Multi-Dwelling Units –
MDUs) are a challenge for the LHEES as cooperation is required from a number of
owners for any works to the buildings fabric and communal areas.
Historic Environment Policy for Scotland (HEPS) (May 2019) 
The Historic Environment Policy for Scotland (HEPS) is non-statutory, but relevant to a
wide range of decision-making at national and local levels. It is supported by detailed
policy and guidance. HEPS outlines six policies on managing change to the historic
environment most notably HEP5 - Decisions affecting the historic environment should
contribute to the sustainable development of communities and places. 
Page 101 of 248

Page 102

22 
LHEES Strategy 2024-2045  November 2023
The Planning (Listed Building Consent and Conservation Area Consent Procedure)
(Scotland) Regulations 2015
Listed building consent is the mechanism by which planning authorities ensure that any
changes to listed buildings are appropriate and sympathetic to their character. Conservation
area consent controls the demolition of unlisted buildings in conservation areas. Both are
important considerations when it comes to installing heat pumps or other technology and
energy efficiency measures (such as external insulation) to the fabric of buildings.
Review of Electricity Market Arrangements (REMA)
The UK Government in 2022 launched a major review into Britain’s electricity market
design to identify opportunities for consumers to benefit from cheaper energy and
enhanced energy security in the longer term. Proposals under the scope of REMA include
the exploration of fundamental changes to the electricity market to remove volatile gas
prices from setting the wholesale cost of electricity, allowing consumers to benefit from
lower cost renewable energy. The outcomes of REMA are critically important to the
successful delivery of the LHEES where it relates to heat pumps and district heating
where the supply relies on electricity. To remove the influence of gas on electricity prices
will reinforce the business case for the electrification of heat in Perth & Kinross.
5.2 Perth and Kinross Context
At a local level a suite of policy documents have been identified through the Policy review
with linkages to the drivers and priorities for developing and implementing LHEES, as set
by the Scottish Government. Key local policies and strategies include:
• Climate Change Strategy and Action Plan – Produced in 2021, this sets out the
Council’s next steps in relation to climate change, outlining the initial route map to
support them to a net zero carbon and climate resilient Perth and Kinross, and
identifies energy and buildings as a key requirement for change. The strategy
commits to developing heat networks, where possible, helping to confirm LHEES as
fundamental in reaching statutory targets. 
• Local Housing Strategy 2022-2027 – Priorities include a goal to deliver
quality homes with affordable warmth, zero emissions and SMART
technology. Intended outcomes that will drive these include supporting the
Page 102 of 248

Page 103

23 
LHEES Strategy 2024-2045  November 2023
implementation of the Council’s LHEES; expanding the capacity of energy and fuel
poverty advice services; and improving the availability of information on fuel poverty
and energy efficiency measures available to front line staff and service providers
to households most in need.
• Local Development Plan 2 – There are four main categories in the LDP: to create
a successful, sustainable place; a low-carbon place; a natural, resilient place; and a
connected place. Priorities include strategic district heating opportunity areas in
Perth, Crieff and Blairgowrie, and Policy 34: Sustainable Heating relates to the
coordination of Heat Network Zones, Major Developments and LDP Site Allocations.
• Community Plan (Local Outcomes Improvement Plan) – Strategic objectives include
reducing poverty, including fuel poverty, through a suite of actions and targets
including researching community renewable energy co-operative schemes elsewhere
in UK and assessing the feasibility of implementing these in Perth and Kinross.
• Corporate Plan 2022-2028 – The Plan sets out a vision for a Perth and
Kinross Council, where everyone can live life well, free from poverty and
inequality. Targets include 6.5% of council housing to meet minimum EPC B by
2023/24 and 12% by 2026/27. 
Page 103 of 248

Page 104

24
LHEES Strategy 2024-2045  November 2023
6. PERTH AND KINROSS BASELINE
This section provides a baseline of domestic and non-domestic buildings in Perth and
Kinross.
6.1 Domestic baseline
What is the current state of Perth and Kinross’s Housing? 
The baseline information has been summarised here to provide context for the remaining
sections. To read the full baseline document for LHEES, please visit this link. 
Page 104 of 248

Page 105

25
LHEES Strategy 2024-2045  November 2023
Poor energy efficiency
A significant proportion (58%) of domestic properties across Perth and Kinross have an
Energy Performance Certificate (EPC) rating of D-G, which is higher than the national
average of 51%. Key points include: 
• The proportion of detached or semi-detached houses in Perth and Kinross (55%) is
higher than national average (39%). This contributes to a larger number of external
walls.
• 45% of domestic properties having uninsulated walls, which is higher than the national
average of 41%.
• 58% of these uninsulated properties are solid stone in construction, which present
challenges when it comes to upgrading the building's structure.
• Larger properties will have a higher heating demand and be more expensive to
upgrade. 15% of properties in Perth and Kinross have 7 or more habitable rooms.
There is a significant spatial variation in energy efficiency by area across Perth and
Kinross, with Strathearn and Highland Perthshire having some of the lowest levels. 
Fuel Type
In Perth and Kinross, 63% of
domestic properties are currently
serviced by the gas grid, while 36%
of domestic properties are not
(known as being off-gas). This off-
gas proportion is significantly higher
than the national average. The
remaining 1% of properties have
unknown off-gas status. In on-gas
areas, 99% of properties are
currently connected to the grid. As can be seen from Figure 2, in off-gas areas there are
a number of fuel sources used. To decarbonise these properties, all properties on oil,   
, 2       
,  
,   Biomass
Electricity
LPG
o fuel
il
Solid
Figure 2 Breakdown of domestic fuel sources for off-gas areas
Page 105 of 248

Page 106

26
LHEES Strategy 2024-2045  November 2023
Liquified Petroleum Gas (LPG) and solid fuel (e.g., coal) will need to transition to
alternative sources.
Fuel poverty 
Table 2 shows that the percentage of households in fuel poverty and extreme fuel poverty
in Perth and Kinross is higher than the national average. This is likely due to the old
building stock and the associated poor energy efficiency of properties in the area.  The
Scottish House Condition Survey (SHCS) 2019 is the most reliable data source available
to local authorities to estimate overall fuel poverty levels and how these vary spatially
across Perth and Kinross.1  However, since this was carried out, the increases in the
energy price cap in 2021 and 2022 have likely led to an increase in probability of fuel
poverty. To account for this the Scottish Government has developed an approach to
deriving an uplifted value to the October 2022 energy price cap as shown below. 
1 Note: The datasets to calculate accurate current fuel poverty levels is not currently available to Local
Authorities and so user surveys and proxy data must be relied upon to make best estimates.
What is Fuel Poverty? A 10% threshold is used in a two-part metric where a
household is in fuel poverty if:
‘After housing costs, the total fuel costs needed to maintain a satisfactory heating
regime are more than  0  of the household’s adjusted net income and if, after
deducting fuel costs, housing costs, benefits received for a care need or disability, and
childcare costs, the household’s remaining adjusted net income is insufficient to
maintain an acceptable standard of living’.  
What is Extreme Fuel Poverty? ‘Where more than 20% of the income after housing
costs is spent on required fuel costs and there is insufficient residual income to
maintain an acceptable standard of living.’  
Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 2019
Page 106 of 248

Page 107

27
LHEES Strategy 2024-2045  November 2023
Table 2 - Fuel Poverty Levels and Extreme Fuel Poverty Levels
Scotland - SHCS
2019
Scotland - SCHS
2019 - Uplifted
value (2022)
Perth & Kinross
SCHS 2019 –
Original value
Perth & Kinross
SCHS 2019 -
Uplifted value
(2022)
Percentage of households
in fuel poverty
24%  35% 28% 63%
Percentage of households
in extreme fuel poverty
12% Not Available 18% 40%
The average probability of fuel poverty and extreme fuel poverty is higher in off-gas
properties than on-gas properties, as shown in Figure 3. In particular, off-gas properties
with electricity and solid fuel types tend to have a higher probability of fuel poverty. Heat
decarbonisation and energy efficiency improvements in off-gas properties therefore present
the opportunity to reduce fuel poverty. However, any recommendations for interventions in
heat decarbonisation should carefully consider the impact on fuel poverty, ensuring that it
is not exacerbated. 
Figure 3 Probability of fuel poverty for on-gas and off-gas properties (Note: Data is based on 2019 SHCS values as was not available
for the uplifted values)
Page 107 of 248

Page 108

28
LHEES Strategy 2024-2045  November 2023
6.2 Non-domestic baseline
What is the current state of Perth and Kinross non-domestic properties? 
The baseline information has been summarised here to provide context for the remaining
sections. To read the full baseline document for LHEES, please visit this link.
Perth and Kinross non-domestic building stock is made up of 7,181 buildings with a total
annual heat demand of 810 GWh/yr.  In general, acquiring energy demand data for the
non-domestic sector is more challenging as valid EPCs are only in place for 19% of
properties in this sector. As such, heat demand data used in this baseline is based on
modelled heat demands.
The division of fuel type by property count is shown in Figure 4. Approximately 52% of
non-domestic properties are served by mains gas and this accounts for 63% of the total
annual heat demand.
Page 108 of 248

Page 109

29
LHEES Strategy 2024-2045  November 2023  
As can be seen from Figure 5, the building typologies (sectors) with the largest heat
demand are educational buildings (i.e., schools, colleges, and universities), offices and
hotel buildings. 
• Educational buildings have the highest heating demand at ~112 GWh.
Approximately 59% of these buildings rely on gas. 
• Perth and Kinross is home to around 1,000 office buildings, which collectively
contribute to 13% of the total non-domestic heat demand (108 GWh). 
• Hotels, which include individual holiday rental properties, have a total annual
heat demand of 104 GWh. Compared to other building typologies, hotel buildings
have a lower proportion of heat demand met by gas (48%, 50 GWh), which is
likely to be attributed to their rural location. 
• Light industry and manufacturing accounts for 11% of non-domestic heat demand
in Perth and Kinross. Heavy industry and manufacturing only accounts for <1%
of the heat demand. It is important to recognise that this figure may potentially
be larger in reality, as certain process demands might not be accounted for in
the formation of the dataset used. 
Electricity
Gas
LPG
ff Gas Unknown
il
ther
Biomass
Figure 4  Heat source for non-domestic properties (by count of property)
Page 109 of 248

Page 110

30
LHEES Strategy 2024-2045  November 2023
The non-domestic heat demand is not uniformly distributed across Perth and Kinross.
Strategic actions and zones are defined at a data zone level which is a common
geography used across the public and private sector to represent communities and have
populations of 500 to 1,000 residents. The data zones with the highest heat demand from
non-domestic buildings are those that contain industrial estates or large campuses, such
as Perth Royal Infirmary, and in urban centres such as Perth City Centre.
Figure 5 Building typology (sector) by heat source 
The proportion of heat demand used for providing hot water will influence the zero-
emissions heating system used to meet heat demand. Figure 6 shows the heat demand
for each building typology, split by space heating and hot water demand. Hotels and
health sector buildings have a higher proportion of hot water demand compared to other
building typologies. These building typologies also tend to have high peak demands which
will impact system sizing and may require a secondary heating system to ensure peak
demands can be met.
0 1000 2000 3000 4000 5000 6000 7000 8000
Grand Total
Hotels
Retail
Offices
Light manufacturing and industry
Storage and distribution
Education
Clubs and community centres
Cafes, pubs, restaurants and takeaways
Place of worship
Agricultural
Health
Museums, art galleries, libraries and law courts
General sports and leisure
Emergency services
Other
Heavy manufacturing and industry
Large entertainment sites
Military and prison
Electricity Gas Condensing Boiler LPG
Off Gas Unknown Oil Boiler Other
Wood Pellet Boiler
Page 110 of 248

Page 111

31 
LHEES Strategy 2024-2045  November 2023
Figure 6 Split of heating demand by building typology 
Page 111 of 248

Page 112

32
LHEES Strategy 2024-2045  November 2023
7. VISION, OUTCOMES AND TARGETS
This section presents the LHEES Vision, Outcomes and targets.  
7.1 LHEES Vision 
Informed by the evidence and working with stakeholders, a vision for Perth and Kinross
LHEES (2024-2045) has been developed. 
Perth & Kinross Council supports Scotland’s Heat in Buildings Strategy vision that by 2045
our homes and buildings are cleaner, greener, easy to heat, and no longer contributing to
climate change, as part of the wider just transition to net zero. 
The vision for Perth and Kinross’s first Local Heat and Energy Efficiency Strategy is:
The vision for Perth and Kinross’s first LHEES is set within the overall ambition to become
Net Zero by 2045 which the Council committed to in December 2021. The Council is also
committed to a 75% reduction in carbon emissions across its area by 2030 and to make
all its own buildings net zero by 2038.  
7.2 LHEES Outcomes
The vision will achieve significant outcomes including: 
Vision
By 2045, our homes and buildings will be more energy efficient
and with more decarbonised heat sources providing more
affordable warmth and no longer contributing to climate change.
Page 112 of 248

Page 113

33
LHEES Strategy 2024-2045  November 2023
Significant Reduction in Carbon Emissions: widespread adoption of energy-efficient
technologies and decarbonised heat sources will have led to a substantial reduction in
carbon emissions from homes and buildings. 
Affordable and Sustainable Heating: heating in homes and buildings will become more
affordable, with a greater reliance on renewable and low-carbon energy sources. This will
reduce energy bills for residents and businesses while promoting sustainability. As energy
becomes more affordable and efficient, it will help alleviate fuel poverty, ensuring that
vulnerable communities have access to the warmth and comfort they need without
straining their finances. 
Health and Well-being Benefits: Energy-efficient building designs and technologies will
lead to improved indoor comfort levels, ensuring that people can enjoy warm and
comfortable living and working spaces without the need for excessive energy consumption.
Reduced pollution will improve air quality. 
7.3 LHEES targets
The Perth and Kinross LHEES is driven by Scotland’s overarching statutory targets for
greenhouse gas emissions reduction and fuel poverty: 
The key targets and the current Perth and Kinross position are outlined in 
Table 3 to Table 5.   
Page 113 of 248

Page 114

34 
LHEES Strategy 2024-2045  November 2023 
Table 3 - Energy efficiency targets against Perth & Kinross Baseline
Key Targets – Housing
Stock 
Target Year
P&K Level of
Compliance
value
Number of
households/properties
requiring retrofit
Estimated
retrofit costs
(£M)
All Social Housing EPC D or
Above
2026 93%  1,100 (Included in
EPC B total)
All Social Housing EPC B or
Above 
2032 17% 13,600 £145.1
All Domestic Private
Rented Properties EPC C or
Above
2028 28% 8,700 £147.5
All properties should meet
EPC Band C (residual
Owner Occupier)
2033 32% 31,400 £616.1 
Table 4 - Fuel Poverty targets against Perth & Kinross Baseline
Key Targets – Fuel Poverty Target Year
P&K Current
Fuel Poverty
Levels
Number of
households
currently in
fuel poverty
No more than 5% of households in fuel poverty
(More than 10% of net household income on fuel)
2040 63% 44,900
No more than 1% of households in extreme fuel
poverty
(More than 20% of net household income on fuel)
2040 40% 30,200  
Page 114 of 248

Page 115

35 
LHEES Strategy 2024-2045  November 2023
Table 5 - Heat decarbonisation targets against Perth & Kinross Baseline
Key Targets – Heat and
Decarbonisation
Target Year
P&K
Current
value
Estimated number of
households/properties
requiring interventions
70% of heat for non-domestic buildings
will be using low carbon technologies
2032 9% 4,300
35% of domestic heat demand will be
supplied using low carbon technologies
2032 18% 12,700 
Given the statutory targets for Scotland are already ambitious with respect to the other
nations in the UK and the huge scale of the transformation required in Perth and Kinross
to meet these, Perth and Kinross LHEES targets are aligned with the Scottish statutory
heat and energy targets. However, it is recognised that these targets would be very
challenging if no significant public and private investments are made available or come
forward as well as if behaviours are not changing. This would be particularly the case for
private households and small and medium businesses.  
Page 115 of 248

Page 116

36
LHEES Strategy 2024-2045  November 2023
8. LOCAL CHALLENGES AND OPPORTUNITIES
Delivering a heat and energy transformation at the scale required to meet the Scottish
Government requirements and Perth and Kinross ambitions poses both significant barriers
and challenges and offers significant opportunities.
8.1 Barriers and Challenges
Several barriers and challenges to delivering the LHEES and reaching our strategic aims
have been identified by PKC and key stakeholders. These include:
Physical building stock
Predominantly due to the age of the housing stock, Perth and Kinross houses have a
higher percentage of hard-to-treat houses in every key criterion than the Scottish average,
as shown in Table 6. The proportion of buildings built pre-1919 is significantly higher than
national average with nearly all of these built using traditional construction methods with
solid brick and stone and designed to provide passive ventilation. They are classed as
“hard-to-treat” in retrofit terms as installing external or internal wall insulation for these
properties can often be more expensive and involve more invasive installation procedures. 
The majority of these pre-1919 buildings are also either listed or located in conservation
areas, or both, posing an additional challenge for retrofit interventions.
Table 6– Comparison of the Perth & Kinross vs Scottish Average Building Stock
Category Perth and Kinross  Scottish Average
Age - Pre-1919 Buildings 24% 18%
Tenure - Private rented accommodation 16% 13%
Size - Detached or semi-detached 55% 39%
Fuel – Off gas 36% 19%
Energy Efficiency – EPC bands D-G 58% 51%
Heritage – In conservation area 14% 10%
Fuel poverty 28% 24%
Page 116 of 248

Page 117

37 
LHEES Strategy 2024-2045  November 2023
Affordability and tenure
Perth and Kinross has lower levels of
social housing at (14%) than the Scottish
average. This is the sector that Perth &
Kinross Council has the most direct control
over. Private rented accommodation levels
are higher than the Scottish average.
While there are deadlines associated with
the property transition, it has been
observed that some landlords are preferring to sell their properties rather than upgrade
them or costs of upgrading are reflected in rent uplifts. 
Funding
The total investment required for homes and buildings to reach net zero by 2045 across
Scotland is in excess of £33 billion.  There is a lack of funding and support, at the right
scale, to support the upgrade of heat in buildings. There are existing schemes to support
social housing and fuel poor homes, as well as grants and interest-free loans accessible
to residents. Furthermore, the government’s emphasis on funding heat networks does not
lend itself well to a more rural area that has a relatively limited number of viable heat
networks. Additionally, whilst there is private investment available, it is often harder to
attract to more rural areas, especially given the economies of scale compared to city
regions.  In response to funding challenges, Scottish Government has established the
Green Heat Finance Taskforce to explore and identify innovative financing mechanisms to
help individuals and organisations make their properties warmer, greener and more
efficient. 
Public awareness and buy-in
Public awareness of what individuals and businesses can and need to do to make this
energy transition is still widely lacking. For those who want to take action; having a trusted
source of technical knowledge has been identified by many as a barrier to taking further
action. 
Page 117 of 248

Page 118

38 
LHEES Strategy 2024-2045  November 2023
In Perth and Kinross, several organisations currently provide free home energy advice and
home visits, including SCARF, the HEAT Project, Warm Connection and the Citizens
Advice Bureau. At the current combined scale of operation over the next 10-years, these
organisations will only have the capacity to reach approximately 25% of homes requiring
retrofitting. 
Building public trust in new technologies will be important for adoption – both for heat
pumps and heat networks. Both are still new to Scotland and Perth and Kinross with
relatively low levels of consumer confidence. A key concern for consumers relates to being
‘locked in’ to a heat network with no option to go to the open market for a better price in
response. 
Skills and supply chain
Heat transition and energy efficiency bring a huge opportunity to create jobs and develop
new skills in the workforce. However, there is undoubtedly a gap at present between the
targets now set and the capacity of our supply chains and skills to deliver. This includes: 
• For a scaled-up deployment of heat pumps, the existing workforce will need to
develop (more) electrical skills to complement existing gas engineering or
plumbing skills. Evidence from consultations suggests that these skills are already
in great demand, with evidence of companies struggling to fill positions as a
result of short supply. 
• There is a need for growing capacity in the region’s education and training
system. This is not just for volume, but for effectiveness, responsiveness and
connectivity between education and training providers and businesses. 
• There is also evidence that there are not enough local businesses to supply the
goods or services to support heat transition and energy efficiency improvements. 
Lack of regulation and misalignment of national targets
While Scotland has leading climate targets and even with the Scottish Government’s Heat
in Building Bill which sets out its plans to regulate the domestic and non-domestic sector
decarbonisation, there remains limited influence the Council can exert to ensure the timely
Page 118 of 248

Page 119

39 
LHEES Strategy 2024-2045  November 2023
upgrade of buildings. This risks leaving the ambitions of Perth and Kinross potentially
constrained when opportunities are identified, as there are no regulatory enforcements,
other than for the social housing sector, that can be readily utilised. It is not until this
regulation comes into force that the transition in the private market will be able to take full
effect. 
Grid capacity
Decarbonising heat, focusing on heat networks and heat pumps, which run on electricity,
places significant pressures on the grid.  Heat pump uptake potential for Perth and
Kinross is high with approximately 49% of our buildings highly suitable for transition to
meet regulatory targets.  The grid is already constrained or near capacity at several
locations within Perth and Kinross.   Future changes in available capacity and wider
energy system decarbonisation must be considered when planning strategic widespread
deployment of heat pumps. 
The Council are working alongside SSEN and other partners in the Regional Energy
System Optimisation Planning (RESOP) project, which will utilise the outputs of our
LHEES, LAEP and our live Delivery Plans to plan decarbonisation pathways by enabling
low carbon technologies (LCTs) such as heat pumps to be sited in cost-effective locations
whilst providing early warning to SSEN of additional demand on the network.  This will
help us to ensure alignment with grid investment planning in the near to medium term,
while helping to improve and shape longer term roll out and investment required up to
2045.  Alignment of our investment planning with SSEN and other key delivery partners
will support the development and triaging of a pipeline of low carbon projects through to
delivery, avoiding risks and barriers posed by grid capacity. 
Data availability
There are issues with the current data availability, access and sharing that impact on the
ability to target priority areas for action and require the use of proxy data.  These include:
• Non-domestic sector data
• Energy consumption and heat demand data, especially for large users
• Fuel poverty data
Page 119 of 248

Page 120

40 
LHEES Strategy 2024-2045  November 2023
• Funding eligibility data
• Data protection and commercial sensitivity 
8.2 Opportunities
The delivery of the Perth and Kinross LHEES also brings many opportunities. 
Use of natural assets, waste heat and new technologies
There is potential for several technologies using our natural assets which could be used to
provide heat sources for potential heat networks. These include:
• Water source heat pumps which could use heat from the River Tay and other
local bodies of water.
• Ground source heat pumps which could use heat at a maximum depth of 200
metres underground.
• Energy from waste which could use heat produced from burning waste.
• Geothermal which could use heat from 500 and 2,500 metres underground.
• Heat pumps and exchangers which could use heat from wastewater or the public
sewer.
• Other sources of waste heat.
Hydrogen
Hydrogen could be used on a large scale as a cleaner replacement for natural gas in the
gas grid, supplying individual boilers or heat networks. The UK Government will take
decisions on the role of hydrogen in the Great Britain gas network from 2026. 
Given the Scottish Government’s proposed hydrogen use hierarchy and the forecasted cost
and supply constraints, hydrogen is not currently considered as a significant heat source in
the Perth and Kinross LHEES, but the development of the sector and alignment with
developing policy will be tracked in liaison with Scottish Gas Network, one of our key
stakeholders. 
Green jobs and building a green economy
With over £900M in retrofit investment needed in the domestic sector alone in Perth and
Kinross over the next decade, there is significant potential to grow good green jobs.  In
addition to the direct skills required to deliver the transition (installation of heat pumps &
Page 120 of 248

Page 121

41 
LHEES Strategy 2024-2045  November 2023
insulation, etc.), there is also the potential for a secondary economy to develop, focused
on finding circular uses for the old assets (gas boilers, single glazed windows, etc). 
Financing
Heat networks typically have high up-front capital costs alongside a longer-term return on
investment. This causes challenges in business case development and at present, nearly
all schemes require government subsidies to make them deliverable. There is increased
private sector interest in heat networks, especially when at scale. In Perth and Kinross,
the development of large-scale district heating in Perth may be a key strategic heat
decarbonisation opportunity attractive to the market for private investment. However, this
may be more attractive when packaged with other energy projects. 
Public-Private Collaboration
There are opportunities for public-private collaboration. Partnerships could be developed
between Perth & Kinross Council and other public sector/social organisations such as
Registered Social Landlords (RSLs) or between public/social organisations and Distribution
Network Operators (DNOs) or indeed the wider private sector. One option progressed by
other areas in the UK is a Strategic Energy Partnership to bring private sector expertise
and to secure significant levels of capital investment required for the development of heat
networks and other energy-related projects. The projects taken forward by the energy
partnership could deliver on local priorities relating to carbon reduction, fuel poverty and
energy security with the aim of developing Smart Local Energy Systems. 
Co-benefits
There are several societal co-benefits associated with the delivery of the LHEES.  These
include:
• Reduction in fuel bills, associated with energy efficiency improvements and
potential heating source improvements (e.g., oil to heat pump)
• Warmer and healthier homes with improved indoor air quality
• Increased energy security, with local or renewable Scottish sources able to meet
a higher percentage of energy demand.
Page 121 of 248

Page 122

42 
LHEES Strategy 2024-2045  November 2023
The LHEES is an opportunity to bring in a whole energy system approach to maximise all
of these co-benefits. 
9. ENGAGEMENT AND CONSULTATION
This section details the engagement and consultation process which took place for the
development of the LHEES Strategy and Delivery Plan.
9.1 Engagement in strategy development
In line with Perth and Kinross Offer and with best practices in strategy development,
engagement with our communities and stakeholders has been the driver to design Perth
and Kinross LHEES and will be crucial for its successful delivery.
We have organised ourselves to design, agree and deliver an effective engagement plan
with the support of Arup, our external adviser.
Perth and Kinross Council Climate Change Board agreed the overall strategy development
scope and engagement plan with the Executive Director (Communities) as the Executive
Sponsor and Climate Change and Smart Investment Manager as the Senior Responsible
Officer. The approval of the P&K LHEES strategy and delivery plan sits with the Council’s
Climate Change and Sustainability Committee.
Reporting to the Board, a Project Team led the development and engagement process
with two project co-leads ensuring co-ordination and day-to-day management. A cross-
Council LHEES Working group ensured that information and experience was shared across
the Council with key individuals focusing on specific areas of work.
A stakeholder mapping was carried out to identify stakeholders. Based on the likely level
of interest and influence on the project, stakeholders have been categorised into four
groups: 
• TIER 1 – Ongoing engagement throughout the project at defined workshops e.g.
identifying priorities and for delivery. Specific engagement plans developed as
required.
Page 122 of 248

Page 123

43 
LHEES Strategy 2024-2045  November 2023
• TIER 2 – Participate in workshops and engage with the project at key milestones (if
required). Potentially one-to-one contact during data collection stage and one-to-one
interviews to be held with these stakeholders to gain further insight and
understanding of priorities and delivery contributions. 
• TIER 3 and 4 – Potentially participate in workshops and engage with the project at
key milestones (ad hoc basis). Receive a direct invite to public consultation. 
TIER   stakeholders were invited to form a LHEES Steering Group with Council’s
representatives and a first meeting of LHEES Steering Group took place on 30th March
2023. The Steering Group’s role, remit and membership is set out in in Appendix B to this
Strategy.
The engagement plan was structured around a series of Steering Group workshops and
one-to-one interviews. Workshops’ invitations and interviews were extended to other
stakeholders’ groups when relevant to the topic.
• Workshop 1 (March 2023): Objective setting - Knowledge building and awareness
raising for key stakeholders; establishment of ongoing engagement opportunities and
activities to support LHEES.
• Workshop 2 (May 2023): Baseline feedback and Strategic Options and Priorities -
Scenarios to be developed for optimisation modelling and to support finalising focus
for the LHEES Strategy.
• Workshop 3 (June 2023): Heat Network Zones – identification of Heat Network
Zones and discussion.
• Workshop 4 (July 2023): Online modelling feedback - Prioritised decarbonisation
pathway that will be used to inform the LHEES Strategy and Delivery Plan.
• Workshop 5 (October 2023): Draft Strategy and delivery plan - Present the draft
Strategy and Delivery Plan for discussion and feedback.
In addition to the formal LHEES engagement, the Strategy development is based on wider
stakeholder and community engagement by PKC and our partners.  These include:
• PKC’s Local Housing Strategy inputs and consultation (2022);
Page 123 of 248

Page 124

44
LHEES Strategy 2024-2045  November 2023
• Big Place Conversations held across Perth & Kinross in Spring/Summer 2023;
• Net Zero Living – Pathfinder Places public engagement in Aberfeldy, Tulloch and
Blairgowrie (Spring 2023).
9.2 Outputs of community consultation
Following consultation with partners and stakeholders, a draft LHEES vision with priorities
for action was developed. Before the final strategy was developed, we wanted to make
sure that local people, communities and stakeholders have their say on whether these
priorities will make a positive difference to meeting their needs.
The views of residents, the local community and stakeholders are crucial in ensuring that
the first LHEES truly reflects the issues faced by local people and includes the correct
priorities and actions to address these issues. In developing the LHEES, we have
consulted with local stakeholders from an early stage and want to continue that process
with residents and the local community to make sure we get it right.
We issued a consultation document with evidence reports on 3 October 2023 with a
response deadline on 29 October 2023. Details of the consultation document and related
reports could be accessed at Perth and Kinross Local Heat & Energy Efficiency Strategy
2024-2045 Consultation - Perth & Kinross Council Citizen Space - Citizen Space
(pkc.gov.uk).
The Consultation document asked a number of questions and although the number of
responses was low, it provided a qualitative insight into public perception of LHEES. A
summary is provided below: 
- Vision and outcomes: agreement and good positive support. Presented clearly-
However, generally, quite complex and technical area with jargon.
- Targets: alignment to Scottish targets was supported. However, doubts about the
availability of finance to achieve them as well as the need to change behaviours.
- Challenges: agreement with identified challenges. Historic and listed buildings would
need more considerations.
- Opportunities: agreement with identified opportunities. Use of hydrogen was raised as
difficult and not certain. More emphasis on social value opportunities as co-benefits.
Page 124 of 248

Page 125

45 
LHEES Strategy 2024-2045  November 2023
Expected future decoupling of gas and electricity prices could be highlighted. Heat as
by-product to support heat network could be highlighted.
- Strategic priorities: Strategic priorities may need to be prioritized with improving the
fabric of buildings first before changes to the heating system.
- Strategic actions: heat network zones focus should put more emphasis on the scope
to use District Heating systems in rural towns, especially where there is active and
motivated community involvement and therefore not use the model too rigidly.
Emphasis on heat pumps is questioned in relation to installation and operating costs
and this should be reflected in the delivery timescale and considering phased heat
supply (lowering temperature in line with energy efficiency progress). Funding capacity
of private owners was also highlighted as a challenge particularly when gas prices
are cheaper than electricity. More generally, actions are comprehensive. It was
suggesting adding an action to complete a detailed risk review and maintain the
resultant risk matrix/register for each action with early engagement with private sector
partners through this process to sense check and advise on actions and their
progress/outcomes. 
- Delivery Plan: early engagement with potential private sector partners would be
beneficial and lead to quicker resolutions. The selection of criteria was supported. It
was suggested to add information on the compatibility with target timelines for each
of these.
- Supporting mechanisms: the whole energy system approach was supported. Skills
supply and demand and local supply chain were highlighted as important with
attraction of new people to the industry, upskilling and keep it local. Supporting
Community to take advantage of heat transition was also highlighted as important by
informing better, providing financial support, but also building on existing practices.
Mobilising public and private investment was supported including exploring strategic
energy partnership as this could simplify procurement, ensure commitment from
partner/s, and is likely to lead to wider positive impacts. However, there is a need to
ensure it does not prevent other investment in the area. Early involvement of private
sector delivery partners, to prevent challenges and delays in procurement and
delivery. In particular, early confirmation and clarity on a) the role that the Council
wishes to play in the long term energy solution (and heat network) development and
deployment and b) the method by which it will procure development, investment,
delivery and operational services for the energy system and c) the model which it will
establish for how it will work with industry in the supply of services, for example
Memorandum of Understanding, joint venture or concession model. This will be
Page 125 of 248

Page 126

46
LHEES Strategy 2024-2045  November 2023
important to provide investors with signals on scale of opportunity and likely
commercial arrangements underpinning heat networks deployment. 
The outputs from the consultation have been used in finalising the LHEES Strategy and
Delivery Plan. 
9.3 Impact Assessments
Perth and Kinross Council has considered the following impact assessments in developing
the LHEES.
Table 7 PKC LHEES Impact Assessment
Impact Assessment Status Comments
Strategic
Environmental
Assessment
Screened out at
the Screening
Stage
To view the Screening Report and
Determination, please visit:
https://www.pkc.gov.uk/article/23543/Strategic-
Environmental-Assessment
Data Protection
Impact Assessment
Required -
Completed
Equality and
Fairness Impact
Assessment
Required - On-
going
Consultation with Perth & Kinross Equalities
groups on-going as part of wider public
engagement.
Potential for significant positive impact.
Business and
Regulatory Impact
Assessment 
Scoped out Following internal screening this Strategy
was deemed not applicable
Page 126 of 248

Page 127

47 
LHEES Strategy 2024-2045  November 2023
10. STRATEGIC PRIORITIES
10.1 LHEES Priorities 
To achieve this vision and outcomes, two strategic priorities form the basis of the Strategy
and Delivery Plan: 
There are not ranked in order of priorities and a fabric first approach should always be
used. These were developed through an evidence-based approach drawing on national
and local strategies; engagement with key stakeholders; and an analysis of the buildings in
Perth and Kinross. 
The delivery of these two strategic priorities will be supported through prioritisation of
actions, a whole energy system approach and key supporting delivery mechanisms.
To support the successful delivery of our Strategic vision and priorities, a number of ideas
for action have been identified, assessed and prioritised by the Council with key
stakeholders. 
Perth and Kinross-wide mapping of heat decarbonisation opportunities, alongside whole
energy system considerations, was completed to identify where interventions are most
suitable and where challenges exist. The analysis supports the development of a long
term, strategic investment framework through prioritisation of our strategic zones, including
heat network zones and more granular delivery priorities - targeting areas for projects,
programmes, engagement and providing a focus for delivery of a pipeline of projects over
the short to medium term. 
Priority 1 
Decarbonising heat within a transitioning energy system focusing on heat
networks and heat pumps.
Priority 2 
Improving buildings’ energy efficiency aiming for affordable warmth and
regulatory compliance.
Page 127 of 248

Page 128

48 
LHEES Strategy 2024-2045  November 2023
10.2 Strategic Zoning 
Strategic zones were generated to assess our strategic priorities - decarbonised heat
within a transitioning energy system (potential heat network zones and heat pump
suitability) and improving buildings energy efficiency, to meet regulatory targets and
address fuel poverty delivering affordable warmth. 
A range of evidence was used to prioritise strategic zones and actions including:
• the domestic baseline and non-domestic baseline for our building stock
• Portfolio Energy Analysis Tool (PEAT) retrofit scenarios to ensure that buildings
are retrofitted to comply with policy set out in the regulatory standards outlined in
the Heat in Buildings and Energy Efficiency Standards for Social Housing post-
2020 (EESSH2)
• Non-domestic retrofit analysis modelling energy efficiency measures influenced by
the building typology to assess possible energy savings. 
• Scottish and Southern Electricity Networks (SSEN) infrastructure and capacities
including Primary substations (33kV/11kV) and the Electricity Supply Areas (ESAs)
that they serve as an indicator of substation capacity.
Strategic Zones for our identified priorities aim to spatially set out areas of focus to
decarbonise the building stock, with a focus on understanding the current performance of
buildings, and an analysis of cost-effective opportunities for significant energy and
emissions reductions. Strategic Zoning evaluates various aspects of energy efficiency and
heat decarbonisation in Perth and Kinross.
The aim of Strategic Zoning is to understand the opportunities and potential challenges
associated with heat decarbonisation and energy efficiency improvements, at a strategic
data zone level (e.g., 500-1000 residents) for inclusion in the LHEES.
The analysis and visualisation were undertaken using mapping which integrates multiple
variables affecting heat decarbonisation, energy efficiency and deliverability to identify
specific challenges and opportunities in delivering interventions.  This approach represents
a significant advancement beyond the LHEES methodology and facilitates a deeper
Page 128 of 248

Page 129

49 
LHEES Strategy 2024-2045  November 2023
understanding of opportunities and challenges, as well as actions that could form the basis
of delivery planning for the Council. 
10.3 Strategic vs Delivery zoning for priorities
The LHEES methodology requires development of strategic priorities and zones which set
out how a local authority proposes to meet longer term national and local objectives and
prioritise areas to meet these targets.  This is supported by complementary, more granular
delivery priorities and areas pinpointing targeted intervention and early, low-regrets
measures in the near to medium term (5-year focus). This process is illustrated in the
diagram below and delivery plan priorities are described further in section 11. 
Page 129 of 248

Page 130

50
LHEES Strategy 2024-2045  November 2023
10.4 Strategic Priority 1a: “Delivering decarbonised heat within a
transitioning energy system – Heat Network Zones”
Regulatory targets for heat decarbonisation are:
• By 2030, emissions from buildings have to be 68% lower than 2020 levels 
• By 2032, 70% of heat for non-domestic buildings will be using low carbon
technologies
Approach for Identifying Potential Heat Network Zones
Heat Networks (Scotland) Act 2021 places a duty on local authorities to carry out a review
of potential areas for heat networks.  The formal designation of heat network zones will
use outputs from LHEES as a starting point for more detailed work on consideration and
formal designation of heat network zones.  Secondary legislation and guidance are being
phased-in between May 2023 and 2025 and will include the formal designation of potential
heat network zones.
The approach to identifying potential zones builds upon the national heat network
assessment methodology. Potential zones have been preliminarily screened by key
stakeholders to identify any known issues or barriers which limit taking the zone forward
for further investigation.
What is a Heat Network? Heat networks (also known as district heating) supply heat
from a central source to consumers, via a network of underground pipes carrying hot
water. Heat networks can cover a large area or even an entire city or be fairly local
supplying a small cluster of buildings.
What are Potential Heat network zones?  Potential Heat network zones are areas
particularly suitable for heat network development. The purpose of the zones is to
attract investment from heat network developers. 
Page 130 of 248

Page 131

51
LHEES Strategy 2024-2045  November 2023 
The LHEES methodology uses two sets of criteria to identify potential heat network zones
(Table 6). Stringent zones have a higher level of heat demand and greatest potential
financial viability, while Baseline Zones are still expected to be viable, but less so than
Stringent Zones. 
Table 6: Thresholds criteria used for Potential Zone identification and prioritisation
Linear heat density
benchmark
(kWh/yr./m) 
Anchor load threshold
(MWh/yr) 
Minimum number of
anchor loads per
cluster 
Baseline   4,000  500  2 
Stringent  8,000  500  5 
Potential Heat Network Zones
Due to the rural nature of Perth and Kinross, the potential for heat networks in the local
authority area is limited to a few urban areas and towns. Two zones were identified using
Stringent criteria – one in the Perth City Centre and one in the Inveralmond Industrial
Estate (Perth). These zones have higher heat demand density with a larger number of
anchor loads, making them more likely to be financially viable.  Five further zones were
identified using Baseline criteria, indicating financial viability in these locations may be
limited.  The identified zones include:
• Perth City Centre (Stringent and Baseline)
• Perth Inveralmond Industrial Estate (Stringent and Baseline)
• Perth College/UHI (Baseline only)
• Perth Academy (Baseline only)
What is a Linear Heat Density? “Linear heat density is an industry standard metric that
relates heat to distance, for a heat network it is heat demand per meter of pipe.” 
What is an Anchor Load? “Anchor loads are high heat demand buildings and key
connections on a heat network that usually drive the economics of heat networks.”
LHEES methodology: Heat Networks – Generation of Potential Zones Detailed Practitioner Approach
Page 131 of 248

Page 132

52
LHEES Strategy 2024-2045  November 2023
• Auchterarder (Baseline only)
• Kinross (Baseline only)
• Blairgowrie (Baseline only)
A full summary of potential heat network zones can be viewed here and via a web map
available to explore the full range of heat network opportunities available in further detail.
The seven potential zones are shown indicatively in Figure 7 to Figure 10.  Currently the
extent of the zones is indicative based on the criteria and approach outlined above. The
Council will work towards improving demand confidence, clarifying supply options, and
engaging with potential anchor load connections to support formal designation and refine
zone boundaries. Potential zones will be further verified and reviewed in terms of suitability
as part of the Heat Network Designation work to be undertaken in 2024/25.
Challenges exist for the financial viability of heat networks. Improved regulation, evidence,
funding and policies at both a local and national level are required to maximise the
incentive to invest in heat networks.  The cost of heat compared to conventional fuels like
gas is a key driver of this, but heat networks must also be shown as the most cost-
effective decarbonisation option for buildings within Potential Heat Network Zones.
Page 132 of 248

Page 133

53
LHEES Strategy 2024-2045  November 2023
Figure 7 Indicative Heat Network Zones Perth
Page 133 of 248

Page 134

54 
LHEES Strategy 2024-2045  November 2023
Figure 8 Indicative Blairgowrie Heat Network Zone 
Page 134 of 248

Page 135

55 
LHEES Strategy 2024-2045  November 2023
Figure 9 Indicative Kinross Heat Network Zone 
Page 135 of 248

Page 136

56 
LHEES Strategy 2024-2045  November 2023
Figure 10 Indicative Auchterarder Heat Network Zone 
Page 136 of 248

Page 137

57 
LHEES Strategy 2024-2045  November 2023
Perth City Centre Heat Network
Perth’s heat demand using the Scotland Heat Map, indicated a total heat demand of 0.5
TWh/yr. For comparison, the City of Edinburgh has a total heat demand of 5.4 TWh/yr.
Much of Perth’s heat demand is concentrated in smaller areas of the city, providing areas
of high density of heat that present a significant opportunity for the deployment of a large-
scale district heating system over time. The most significant opportunity for heat networks
lies in Perth, where a feasibility study for a Perth City Centre heat network has recently
been completed. It was proposed that this network could be supplied by a closed loop
ground source heat pump located to supply heat to 15 core sites. Additional buildings to
the south and west of the proposed route (e.g., Dewars Centre, Perth Leisure Centre and
social housing) were identified as potential future connections. Other heat sources such as
geothermal or the River Tay could also be explored.
The development of a commercial delivery model or strategic energy partnership for the
city centre provides an opportunity to inform how this, and other low carbon opportunities,
could be delivered.  The establishment of an energy partnership may help to unlock heat
network development in those areas of Perth and Kinross that are less commercially
attractive but could benefit the most from what district heating can offer. Additionally, an
energy partnership may help to unlock delivery of the wider LHEES and LAEP outcomes.
Blairgowrie, Kinross and Auchterarder Potential Heat Networks
Blairgowrie: A Baseline Zone has been identified in Blairgowrie anchored by loads at the
Blairgowrie Community Hospital, Blairgowrie High School and Live Active Blairgowrie.  
Proctor Production Facilities and Blairgowrie Community Campus are located to the north
and south of the zone respectively.  The zone is adjacent to a development site identified
for mixed-use development.
Kinross: A Baseline Zone has been identified in Kinross anchored by loads at the Live
Active Loch Leven Leisure Centre, Kinross High School, Loch Leven Community Campus
and Loch Leven Health Centre.  
Auchterarder: A Baseline Zone has been identified in Auchterarder anchored by loads at
the Auchterarder Community School and Parkdale Care Home (Council owned). The zone
also includes Auchterarder Library and Aytoun Hall. There is a moderate proportion of
social housing (33%) and fuel poverty probability (28%) in the zone.  
Page 137 of 248

Page 138

58
LHEES Strategy 2024-2045  November 2023
Ground source heat pumps have been identified as the likely heat source for all three
zones.  
10.5 Strategic Priority 1b: “Delivering decarbonised heat within a
transitioning energy system - Heat Pumps” 
For the majority of Perth and Kinross properties that fall outside of potential heat network
zones, heat pumps will be the recommended low carbon heating source. However, we
understand that this would be challenging in terms of costs and public perception and will
therefore will need to manage carefully and where and when it makes sense. 
On-gas and off-gas grid properties have been grouped into four categories depending on
their heat pump suitability as shown in Table 8. It shows that over 28,500 properties in
Perth and Kinross are potentially highly suitable for a heat pump. At 2023 energy prices,
the potential for energy cost savings by switching to heat pumps for well insulated off-gas
households is significantly more than for on-gas households.
Table 8 Heat Pump Suitability Classification
Heat Pump Suitability Category  On-gas properties in
Perth and Kinross
Off-gas properties in
Perth and Kinross
Category 0 - Already have a low or zero
emission heating system.
1%
(314)
5%
(1,472)
Category 1 Considered highly suitable for a
heat pump installation (i.e., well insulated
property with a wet system).
49%
(23,938)
18%
(4,851)
What is a Heat Pump? A heat pump captures heat from outside – either from the air or
ground - and moves it into your home.  The heat pump uses electricity to do this, but the
heat energy delivered to your home is much more than the electrical energy used to
power the system. In well-insulated homes, heat pumps can be comparable in operating
costs to gas and lower than oil. As they produce heat at lower temperatures than gas or
oil-fired systems, their relative cost increases for poorly insulated homes. 
Page 138 of 248

Page 139

59
LHEES Strategy 2024-2045  November 2023
Category 2 - Require moderate fabric
upgrades and/ or the addition of a wet
system
18%
(8,836)
34%
(9,522)
Category 3 – Either requires significant
fabric upgrades) or more suited to other
low or zero emission heating system (i.e.,
biomass, direct electric or electric storage).
32%
(15,559)
43%
(11,904)
Off-gas social housing energy efficiency Category 1 suitable for heat pump
By prioritizing heat pump deployment in social housing properties that are off-gas,
especially those heated by inefficient, carbon intensive systems such as LPG and oil boiler
there is potential for significant fuel poverty and carbon reduction. 
Dunkeld, Crieff, Blairgowrie and Rattray, and Glenfarg emerge as priority regions for heat
pump deployment in social housing properties not connected to the gas network. These
areas host a substantial number of social housing properties that are readily suitable for
heat pump retrofitting and display high substation demand headroom2. In addition, areas
around Crieff, Blairgowrie and Rattray and Perth have a higher number of social housing
properties connected to the gas networks, which are also suitable for heat pump
deployment. 
Off-gas private homes suitable for heat pump retrofit
Crieff, Dunkeld, Blairgowrie and Rattray, Glenfarg, Powmill have significant potential for
heat pump deployment in privately owned properties that are off-gas. Crieff, Perth and
Blairgowrie and Rattray have higher suitability for heat pump installation amongst on-gas,
privately owned properties. However, retrofitting these properties can prove to be
challenging as the responsibility of installing the heat pump falls on the property owner.
Kinross and Milnathort, and Coupar Angus have high concentrations of properties that are
heat pump ready however have limited spare grid capacity posing a risk to deployment. 
2 Demand headroom is the gap between the rating of the electricity network to supply electrical demand and
the actual demand in that part of the network.
Page 139 of 248

Page 140

60
LHEES Strategy 2024-2045  November 2023
The Council will continue to work with SSEN to align investment planning in these areas.
Work being completed for the associated LAEP will undertake modelling to explore the
impact of low-carbon technology roll out on the area’s whole energy system in different
demand scenarios.
Social housing that requires energy efficiency improvements to enable suitability for
heat pumps
The areas of Dunkeld, Crieff, Blairgowrie and Rattray, Perth, Bridge of Earn and,
Glenfarg, have been identified as having both spare network capacity and a high
concentration of social housing with secondary potential for heat pumps - requiring
moderate fabric upgrades and/or the addition of a wet heating system to be heat pump
ready (i.e., Category 2). The same areas are suitable for retrofit for heat pumps on-gas
apart from Dunkeld. Privately owned properties with secondary potential for heat pump
retrofit and spare grid capacity are located in these same areas, however actioning retrofit
in this sector is made more challenging as the responsibility lies with owner-occupiers and
landlords.
A full summary of potential heat pump and secondary heat pump deployment areas can
be viewed here and is supported by web mapping here to explore the full range of
opportunities available in further detail.
10.6 Strategic Priority 2a: “Improving buildings’ energy efficiency to
meet regulatory standards”
Regulatory targets for Energy Efficiency are:
• By 2026 All Social Housing EPC D and EPC B by 2032
• By 2028 Private Rented Sector EPC C
• By 2033, all homes have the equivalent of EPC C. 
All domestic properties in Perth and Kinross were modelled using the regulatory scenario
produced by the Energy Savings Trust in their PEAT model, alongside specific tools
developed for LHEES. Figure 11 outlines the current status and post-retrofit status of
properties according to the PEAT model.  It demonstrates that there are many hard-to-treat
properties, that even after implementing the full suite of standard retrofitting measures,
would still not comply with regulatory requirements.
Page 140 of 248

Page 141

61 
LHEES Strategy 2024-2045  November 2023
Figure 11 Predicted regulatory compliance pre- and post-retrofitting status of domestic properties in Perth & Kinross 
Areas with concentrations of social housing having poorer energy efficiency in Crieff and
Pitlochry, could be strategically targeted for cost effective “quick wins” to meet regulatory
targets for 2026 and 2033, as the total cost of interventions to meet regulatory standards
is low. 
Challenges for the private sector are present across the area, where many privately owned
properties have high intervention costs to meet EPC C targets, which may not be
perceived as an attractive investment for property owners. 
Areas where substantial energy and CO2 emissions savings can be achieved at the lowest
cost are limited and concentrated in Bridge of Earn and Abernethy, North Muirton and
Old Scone, Guildtown, Balbeggie and St Madoes, Errol and Inchture, and Coupar
Angus and Meigle
These areas represent immediate opportunities for cost-effective interventions and could
also be used to plan works to take advantage of economies of scale, by strategically
retrofitting nearby buildings simultaneously including privately owned homes, and in
alignment with the Council decarbonisation assessment. This coordinated approach may
lead to cost efficiencies and drive down the overall expenses associated with energy
efficiency upgrades. 
0
5 000
10 000
15 000
20 000
25 000
0 000
5 000
Housing Association Local Authority wner  ccupied Privately Rented
urrently meets regulatory standards Does not currently meet regulatory standards
eets regulatory standard post retro t Doesn t meet regulatory standard post retro t
Page 141 of 248

Page 142

62 
LHEES Strategy 2024-2045  November 2023 
Non-domestic buildings that require retrofit to meet regulatory targets
Non-domestic buildings in areas across Glenavon and Glendevon have been identified as
high potential for heat demand savings in non-domestic buildings with lower cost retrofit
interventions.  There are several hotels around these areas, which present opportunities for
cost-effective retrofitting. However, retrofitting hotels will present certain challenges to
owners, primarily due to restrictions imposed by the building's age and the need to
preserve the architectural integrity. 
Private ownership limits the Council's authority over decarbonisation plans and strategies
beyond legislation. Engaging with the private sector around their existing decarbonisation
plans can facilitate collaboration between the public and private sectors and align low
carbon planning. Additionally, the Council can play a role in promoting awareness of
funding incentives available for small and medium-sized enterprises (SMEs). For instance,
through the Resource Efficient SME Loan, SMEs can access an interest-free loan of up to
£100,000, specifically designed to support energy efficiency improvements. 
Continued engagement with the private sector, supported by the Council, would help to
identify barriers associated with building retrofit and help to provide tailored solutions aimed
at addressing the specific challenges faced by non-domestic building owners. 
10.7 Strategic Priority 2b: “Improving buildings’ energy efficiency
aiming for affordable warmth”
To assess at a strategic level where poor energy efficiency is believed to be driving fuel
poverty (i.e., where there is a greater impact of poor energy efficiency on fuel poverty) an
approach was followed that considers three different building fabric criteria - low loft
insulation, uninsulated walls, and single glazed windows as indicators of poor energy
efficiency, alongside fuel poverty with specific weightings.
Energy efficiency, which acts as a driver of fuel poverty, is highest in areas around
Pitlochry, Aberfeldy, Crieff, Dunkeld, Perth and Blairgowrie & Rattray emphasising the
need for intervention to address fuel poverty in these regions.
Page 142 of 248

Page 143

63 
LHEES Strategy 2024-2045  November 2023
When comparing areas with high energy efficiency driven fuel poverty with properties
requiring lower cost retrofit options, the areas of Pitlochry, Comrie, Gilmerton and St
Fillans, Blair Atholl, Strathardle and Glenshee, and areas of Perth showed the greatest
opportunity. 
Targeting these areas though tailored awareness campaigns about available funding to
support fuel-poor households, such as the Energy Company Obligation (ECO4), which
provides grants for energy efficiency upgrades funded by the applicant’s energy supplier, is
critical. By disseminating information about these financial support options, the Council can
encourage greater participation in retrofitting initiatives. Furthermore, recognising the unique
needs of vulnerable individuals, the Council should continue to provide support services
and guidance to households that require assistance with the application process through
organisations such as the HEAT Project and Scarf and provide information to Elected
Members to disseminate. This approach ensures that those who may face challenges in
navigating the application process receive the necessary help to access available funding.
Social housing properties in Crieff, Pitlochry and Blairgowrie and Rattray are likely to
experience a greater reduction in fuel poor households due to the implementation of low-
cost retrofit interventions. Local authority owned properties in these areas offer “quick win”
opportunities for the Council, as they provide substantial impact in terms of reducing fuel
poverty, while requiring relatively lower financial investment compared to other locations.  
Retrofitting social housing properties presents several challenges, primarily due to the
occupancy of fuel-poor, vulnerable tenants. Access to the property can be limited as
tenants might face difficulties in vacating their homes, and tenants may be resistant to
changes to their home. To address these complexities, a person-centred retrofit approach
should be implemented during the early planning stages.
Collaborating with local financial institutions, building societies, and mortgage providers can
open possibilities for funding solutions aimed at making retrofitting more accessible to
homeowners. One promising solution to consider is Property Linked Finance, which has
the potential to cover up to 100% of intervention costs. The uniqueness of this financing
option lies in its linkage to the property rather than the individual owner, which can offer a
more inclusive financing opportunity for homeowners interested in retrofitting their homes.
Page 143 of 248

Page 144

64
LHEES Strategy 2024-2045  November 2023
11. DELIVERY PLAN
Accompanying our Strategy is our Delivery Plan. This has been developed in partnership
with key stakeholders and provides a strong basis for action for local communities,
government, investors, developers and wider stakeholders, pinpointing areas for targeted
intervention and early, low-regrets measures in the near to medium term. Due to the
dynamic nature of this plan, and rapidly evolving regulatory, funding and policy landscapes,
it is intended to be kept as a live document and published by February 2024 as a live
plan in a digital planning platform being developed through Project RESOP (Regional
Energy System Optimisation Planning) by Scottish and Southern Electricity Networks
(SSE ) under  fgem’s  etwork Innovation Allowance.
11.1 Delivery Plan Priorities
The LHEES Guidance outlines that the LHEES scope should be framed around the
‘LHEES Considerations’, outlined earlier in this document. LHEES priorities are also
shaped by the local context and as such the delivery of the LHEES will be supported
through targeting areas and related actions linked to our local strategic priorities, supported
by key delivery mechanisms and embedded in a whole energy system approach. 
For each LHEES consideration, strategic priorities and areas have been identified to target
both national and local objectives longer term.  At a more granular level, delivery priorities
and areas have been identified to define potential decarbonisation pathways and pinpoint
areas for near term, low-regret actions to support LHEES delivery.   Delivery areas are at
a higher granularity than strategic areas (i.e., data zones) and set out clusters of buildings,
such as postcodes, where potential solution(s) can be targeted to meet our strategic vision
and priorities.  
The LHEES Delivery Plan will focus on these areas to take forward actions in the near
term that are within the remit of the Scottish Government, local authorities and wider
partners to deliver. Proposed Delivery Plan priorities for the Perth and Kinross’ first LHEES
are centred around the Council and our partners local strategic priorities identified through
a series of workshops and engagement sessions as illustrated in Table 9. 
Page 144 of 248

Page 145

65 
LHEES Strategy 2024-2045  November 2023 
Table 9 LHEES Strategic and Delivery Plan Priorities
NATIONAL LHEES
CONSIDERATIONS
PERTH AND KINROSS STRATEGIC
PRIORITIES  
PROPOSED PERTH AND KINROSS DELIVERY PRIORITIES
Heat networks 1.  Delivering decarbonised heat within a
transitioning energy system 
1. Potential heat network zones
Off-gas heat
decarbonisation
1.  Delivering decarbonised heat within a
transitioning energy system 
2. Off-gas social housing suitable for heat pump retrofit  
3. Off-gas private homes suitable for heat pump retrofit 
Off-gas and on-gas
heat decarbonisation
1.  Delivering decarbonised heat within a
transitioning energy system 
4. Social housing that requires energy efficiency improvements to
enable suitability for heat pump  
Energy efficiency
and energy
efficiency as a
driver of fuel
poverty 
2. Improving buildings’ energy efficiency to
meet regulatory standards 
5. Social housing that does not meet regulations (e.g., below EPC
B) identified for energy efficiency retrofit 
6. Owner occupied properties that do not meet targets (e.g., below
EPC C)  
7. Owner-occupied properties that do not meet targets (e.g., below
EPC C) AND potential suitability for HEEPS:ABS funding 
8. Owner-occupied properties below EPC Band E  
Page 145 of 248

Page 146

66
LHEES Strategy 2024-2045  November 2023
Delivery Plan priorities are the starting point for identifying projects and actions to include
in the Delivery Plan. Each Delivery Plan priority may result in several delivery areas (e.g.,
clusters of buildings at neighbourhood or postcode level) for targeted interventions. 
Potential actions range from prioritising retrofit of our Council assets, wider social housing
joint working to support heat pump roll out, and engagement and awareness raising with
communities and the private sector as detailed below.
11.2 Delivery Plan Area Criteria
Our delivery priorities are shaped by our strategic priorities and associated stakeholder
priorities.  The LHEES evidence base, including consideration of grid capacity, has been
analysed to target properties which match these priorities.   
The key criteria used to develop delivery plan areas are as follows:
• Meeting regulatory targets – change in EPC, Energy savings (kWh), CO2
reduction (tCO2e)
• Fuel Poverty – fuel poverty change (%), Energy bill change
• Deliverable, technically feasible and evidence based – grid capacity, cost of
intervention, type of wall insulation, etc.
• Potential funding availability (e.g., HEEPS-ABS eligible properties)
• Interventions that are already beneficial and no/low-regret (off-gas heat pumps,
heat networks)
• Ability to influence.
The diagram in Figure 12 sets out an example of how the criteria will be used to identify
Delivery Plan areas. 
Page 146 of 248

Page 147

67 
LHEES Strategy 2024-2045  November 2023
Figure 12 Example of how delivery plan area criteria will be applied to identify delivery plan focus areas 
11.3 LHEES/LAEP Live Delivery Plan
The Scottish Government recognises that LHEES will evolve with the introduction of future
standards and regulation, as well as the introduction of new delivery and funding
programmes. This first LHEES is largely focussed on delivery within the scope of the
current and near future funding, regulatory and policy landscape. For example, supporting
the delivery of existing funding (e.g., HEEPS ABS, ECO4); while providing a pathway to
meeting medium to long-term targets and objectives.
The LHEES Delivery Plan is intended to provide a high-level evidence base and a live
tool for Perth & Kinross Council and partners to identify interventions across a range of
technical solutions and funding streams.
Live Delivery Plans will be further informed and be informed by our Local Area Energy
Plan (LAEP) providing a single, integrated process to consider the whole energy system
alongside heat decarbonisation. The LAEP will develop a model to test a range of build-
out rates from 2023 to deliver the future system through various target years (e.g., 2030,
2033 or 2045, or any year in-between).
The LAEP deployment model will incorporate outputs of the policies and strategies review,
building level demand pathways, heat network zoning and include an assessment of the
Page 147 of 248

Page 148

68 
LHEES Strategy 2024-2045  November 2023
alignment with key relevant targets and milestones across heat, transport and supply and
transmission. Multiple scenarios for the future energy system demand, generation,
distribution and storage, will help us mitigate risk by testing the potential limits of the
uncertain aspects of the energy system.  The Council area will be split into zones based
on primary substation locations. Data on both demand and supply for different parts of the
energy system will be aggregated for each zone and modelling will optimise the energy
mix for each of these zones.
11.4 Key supporting delivery mechanisms
To deliver the LHEES priorities, key supporting mechanisms and programmes have been
identified as follows:
Taking a Whole Energy Systems Approach 
Through the development of the LAEP and a collection of complementary initiatives, the
Council is taking a whole systems energy approach to the development and
implementation of the LHEES from generation through to demand. 
Key on-going areas of work to support this approach include:
• Project RESOP (Regional Energy System Optimisation Planning) – RESOP is a
public/private collaboration led by SSEN that takes a ‘whole system’ approach, by
drawing together data on building suitability for heat decarbonisation (heat pumps
and heat networks), building fabric retrofit and wider energy system demand (e.g.
Electric Vehicles) and generation considerations into a single tool (LAEP+) that
can be used to plan retrofit and roll out of low carbon technologies and will
facilitate collaboration between network operators, local authorities and other
energy transition stakeholders to achieve our strategic priorities and outcomes.  
• Council Estate Decarbonisation Planning - The Council is currently undertaking
work to design and deliver a major programme of retrofitting both for its domestic
and non-domestic building stock, focusing on how decarbonising projects should
be prioritised. The work will consider detailed programming, risk analysis, supply
chain capacity and the Council’s operating model, to identify how the Council
could progress and where critical gaps exist (such as in the local retrofit supply
Page 148 of 248

Page 149

69
LHEES Strategy 2024-2045  November 2023
chain) that the Council can start to influence in preparation for major retrofit
projects.
• Smart Local Energy Systems (SLES) - The Council has developed a toolkit that
will allow us to filter projects and develop business cases to triage delivery
actions and areas into a pipeline of investable energy projects based on a range
of priorities. This will lead to the development of an investment programme
enabling Smart Local Energy Systems.
Figure 13 Whole energy systems approach 
Developing green skills and the capacity of the supply chain
There are now numerous studies and policy documents that point to the opportunity for
green jobs in the future.  In Scotland the National Strategy for Economic Transformation
published in March 2022 set out a number of Actions including:
• working collaboratively with employers and unions to increase investment in
upskilling and retraining to better meet the needs of employers and employees in
Scotland’s transition to net zero
• supporting and incentivising employees, and their employers, to invest in skills and
training throughout their working lives
• expanding Scotland’s available talent pool, at all skills levels, to give employers the
skills pipeline they need to take advantage of opportunities
• implementing the Climate Emergency Skills Action Plan to align Scotland’s skills
system with business needs to reach net zero
Page 149 of 248

Page 150

70
LHEES Strategy 2024-2045  November 2023
• implementing the next phase of the Green Jobs Workforce Academy and launching
a new skills guarantee for workers in carbon intensive industries
• developing proposals for a national digital academy to open up access to a range
of subjects for all learners
The priority in decarbonising Scotland’s domestic heat by retrofitting homes and improving
energy efficiency will dramatically reduce consumption and hence bills, regardless of the
ultimate source of heat. Thanks to boiler or heat pump efficiency improvements, any of the
options will deliver significantly cheaper heat for households than older inefficient boilers or
electric radiators.
The STUC report on Green Jobs in Scotland estimated - with the right policies and
funding in place - Scotland could see job creation in the region of 156,000 - 367,000 jobs.
Perth & Kinross is identified as one of the geographical hubs for energy development and
may be well placed for energy related jobs because of the presence of SSE (see picture
be below). 
The shift away from fossil fuels for electricity and heating means that there will be
increasing demand for more electricians, electrical engineers. Employers point towards
specific skills and understanding in fields such as insulation, Passivhaus standards,
maintenance of low carbon tech (including district heating, EV charge points, heat pumps,
solar DC systems, etc.)
Page 150 of 248

Page 151

71
LHEES Strategy 2024-2045  November 2023
Already there are large-scale programmes of retrofitting, with domestic gas boilers being
replaced with air- or ground-source heat pumps.  From 2025, gas and oil boilers will not
be permitted in newbuild homes.  The H100 Fife project3 is a demonstrator project
providing green hydrogen through a new gas network to around 300 households in
Buckhaven and Dunbeath.
This means that the incumbent workforce will require to develop (more) electrical skills to
complement existing gas engineering or plumbing skills.  This will not only be for the
installation of low carbon heating systems, but the replacement of electricity distribution
boards in domestic and commercial properties where such heating systems are retrofitted. 
However, evidence from consultations suggests that these skills are already in great
demand, with evidence of companies struggling to fill positions as a result of short supply.
Nevertheless, there remains a significant challenge in fully understanding skills demand
across region, by sector and for Clean Growth as a whole. Business engagement is a
critical factor here. There is limited intelligence, poor channels of communication on need
where there is engagement, and no smooth engagement with businesses.  This serves to
constrain education and training providers’ ability to respond to business skills need
effectively.  There is a clear requirement to engage with businesses to drive participation in
and contribute to the discourse on green jobs, and to stimulate meaningful conversations
around skills need in this area.  This is particularly important in light of some of the
findings of the recently published Independent Review of the Skills Delivery Landscape. 
There is a need for growing capacity in the region’s education and training system.  This
is not just for volume, but for effectiveness, responsiveness and connectivity between
education and training providers and the Net Zero/Clean Growth business base. 
Perth & Kinross Council, with stakeholders, has identified the need to assess skills
provision and support providers as well as the local supply chain to meet the demand
arising from heat transition and energy efficiency works, operations and maintenance. 
Working in partnership with communities to build community wealth and wellbeing
Perth & Kinross Council is committed to work in partnership with communities through the
Perth and Kinross Offer and for communities to develop solutions locally shared and owned.
3 https://www.h100fife.co.uk/
Page 151 of 248

Page 152

72 
LHEES Strategy 2024-2045  November 2023
Communities could take advantage of heat transition and energy efficiency opportunities and
build community wealth and wellbeing. This could cover energy production, storage or
distribution as well as purchasing goods or services. Perth & Kinross Council with
stakeholders has identified the need to evaluate mechanisms to support communities in
achieving such aim. 
There are several on-going projects across Perth & Kinross that are either community-led or
community-focused that support the heat and energy transformation.  A collection of these is
listed in the Table below. 
Theme  On-going projects
Home Energy Advice to Residents The HEAT Project, SCARF, Warm
Connections, Citizens Advice Bureau all
provide free home energy advice
Community Energy Projects Rumbling Bridge Hydro, Welton of Creuchies
Wind Farm, Comrie Croft Smart Energy Grid
Demonstrator Project are a sample of a few
of the several on-going community energy
projects
Support businesses to address energy
efficiency and decarbonisation
Green Business Grants from PKC provide
funding for businesses, The HEAT Project
provides free energy advice to SMEs
Community decarbonisation  Several groups are focused on decarbonising
their communities and community assets –
examples include CATCH – Loch Leven and
the Blairgowrie and Rattray Development
Trust 
Mobilising partners and public and private investments for projects 
Perth & Kinross Council, with stakeholders, has identified the need to evaluate a possible
Strategic Energy Partnership to unlock delivery of, though potentially not limited to, heat
networks. An energy partnership would be a legally defined, collaborative arrangement between
Perth & Kinross Council and an external organisation to bring capital investment and delivery
Page 152 of 248

Page 153

73 
LHEES Strategy 2024-2045  November 2023
capability into large energy-related projects. The projects taken forward by the energy
partnership could deliver on local priorities relating to carbon reduction, fuel poverty, and
energy resilience. The Council is also considering the scope of any partnership proposed and
will assess the potential for an energy partnership to be the leading body in the delivery of the
wider net zero agenda for Perth and Kinross rather than focused solely on heat networks. This
could mean mobilising other public/social partner organisations to aggregate demand and
programmes. Development of this is a key action in the LHEES Delivery Plan and all options
relating to procurement route, governance structures, control versus risk arrangements and co-
investment would be explored. 
Page 153 of 248

Page 154

74 
LHEES Strategy 2024-2045  November 2023
12. GOVERNANCE AND MONITORING
12.1 Governance
The delivery and review of Perth and Kinross LHEES Strategy and Delivery Plan will be
supported by the following Council’s Governance arrangements and relationships: 
Perth and Kinross Council’s Climate Change and Sustainability Committee will provide
scrutiny, assess performance and consider LHEES Strategy and Delivery Plan reviews. The
nomination of an elected member or elected members as Champions will be explored. 
Perth and Kinross Council Climate Board will provide strategic directions and monitor
progress and performance. An Executive Sponsor and a Senior Responsible Owner will be
identified. 
Perth and Kinross Council Climate Change Working Groups and external partners will
deliver actions via identified project managers and agreed workstreams. 
Perth and Kinross Council LHEES co-ordination team will ensure coordination and
monitoring of Delivery Plan actions and will report to the Climate Change Board. 
Page 154 of 248

Page 155

75 
LHEES Strategy 2024-2045  November 2023
12.2 Monitoring 
Perth and Kinross Council LHEES co-ordination team’s main tasks will include:
- Data: update data and support access to data to all stakeholders
- Communication and engagement: co-ordinate communication and engagement plan
- Risk & Monitoring: develop risk register and produce monitoring reports
- Reviews: prepare and co-ordinate LHEES Strategy and Delivery Plan reviews
- Best practices and training: provide support to project managers in the form of
templates, best practices and training.
- LHEES Steering Group: coordinate and support LHEES Steering Group
Monitoring reports will be produced every quarter for the Steering Group and the Board
and annually for the Climate Change & Sustainability Committee with a full review of the
Strategy and Delivery Plan every 5 years. The next full review will be in 2029. A Risk
register will be developed and has been included as one of the early actions of the
Delivery Plan. 
Engagement will be maintained and developed with key stakeholders through the LHEES
Steering Group and between the Steering Group, Perth and Kinross Council and our
residents, communities and businesses to achieve a successful LHEES Strategy and
Delivery plan delivery. A Communication and Engagement Plan will be developed by the
Steering Group and has been included as one of the early actions of the Delivery Plan.
The Plan will set out how the Steering Group will conduct regular consultation and
engagement with stakeholders. Engagement with residents, communities, businesses and
private landlords would be particularly important. It will also ensure there is awareness of
the key heat transition and energy efficiency priorities for Perth and Kinross until 2029. 
Page 155 of 248

Page 156

76 
LHEES Strategy 2024-2045  November 2023 
13. GLOSSARY
13.1 Abbreviations
Acronym Description
EES Energy Efficient Scotland
EESSH Energy Efficiency Standard for Social Housing
EPC Energy Performance Certificate
EST Energy Saving Trust
GIS Geographic Information System
HEEPS:ABS Home Energy Efficiency Programmes for Scotland: Area Based Schemes
HIB Heat in Buildings
IZ Intermediate Zone
LA Local Authority
LAEP Local Area Energy Planning
LHEES Local Heat and Energy Efficiency Strategy
LPG Liquefied Petroleum Gas
mxd Map Exchange Document
PEAT Portfolio Energy Analysis Tool
SAP Standard Assessment Procedure
ToC Table of Contents
UPRN Unique Property Reference Number 
Page 156 of 248

Page 157

77 
LHEES Strategy 2024-2045  November 2023
13.2 Terms
Terms Description
Baselining Baselining is the purpose of understanding at local authority or strategic level, the
current status of the buildings against the LHEES Considerations, Targets and
Indicators.
Building-level Pathway As part of LHEES Stage 5, a building-level pathway is the outcome of the
assessment undertaken using PEAT. It provides the likely energy efficiency retrofit
technologies, as well as the low carbon heating system (where applicable) to
support building level decarbonisation. 
Criteria Criteria are the settings applied to the Indicators for each Consideration in order to
support Baselining, Strategic Zoning and the identification of Delivery Areas. An           
C                    “  ”                I            “                (Y/ )”
to identify properties with uninsulated walls. Another example is the definition of an
“           ”                                  ,                                         
“           ” I        .         S                           
of default Criteria that local authorities may wish to use, with flexibility to update and
augment these to support local needs or for more focused analysis linked to specific
actions and project identification within the Delivery Plan.
Data - Alternative Alternative data, can overwrite the Core data to improve accuracy (national to local
level of detail, e.g. local housing data to overwrite fields in Home Analytics). 
Data - Core Core data is the data that is essential to complete the minimum requirements of the
LHEES analysis. Core data will come from national datasets e.g. Home Analytics or
the Scotland Heat Map.
Data - Supplementary Supplementary data allows inclusion of additional Indicators to inform specific, local
basel & targets; also, Supplementary data can be used in GIS investigation to
complement the Core analysis carried out in any assessment. An example of
Supplementary data would be the inclusion of a constraints appraisal as part of a
district heating analysis. 
Data Zone Data zones are groups output areas which have populations of around 500 to 1,000
residents.
Delivery Area Delivery areas are at a higher granularity than Strategic Zones. These spatial zones
should set out clusters of buildings within a Strategic Zone or across the whole local
authority that identify potential solution(s) at a delivery level. They will be an
important starting point for identifying a range of projects, regulation and actions
that are within the competence of the Scottish Government, local authorities and
wider partners (included as actions to be developed in the LHEES Delivery Plan).
Detailed practitioner
approach
These Steps form part of the detailed practitioner approach in LHEES Stage 4,
Generation of Initial Areas to set out particularly suitable heat network zones and to
support project identification.  
Indicator For a given Consideration, the purpose of an Indicator is: 
1) to act as a key information field to help characterise and baseline the local
authority.
2) to act as a key information field to support strategic zoning and generation of
initial delivery areas; 
3) if suitable, to act as a key information field to measure progress against Targets
over the duration of the LHEES - set out in the LHEES Delivery Plan. 
For some Considerations, one Indicator may be sufficient, but for others a range
may be appropriate. 
Page 157 of 248

Page 158

78 
LHEES Strategy 2024-2045  November 2023
Intermediate Zone Intermediate zones are a statistical geography that are designed to meet
constraints on population thresholds (2,500 - 6,000 household residents), to nest
within local authorities, and to be built up from aggregates of data zones.
LHEES Considerations The LHEES Considerations are a list of technologies, building typologies and policy
priorities used to identify and target interventions. They include:
- Heat networks
- Off-gas grid buildings
- On-gas grid buildings
- Poor building energy efficiency
- Poor building energy efficiency as a driver for fuel poverty 
- Mixed-tenure, mixed-use and historic buildings
LHEES Delivery Plan An LHEES Delivery Plan is a document setting out how a local authority proposes
to support implementation of its local heat and energy efficiency strategy.
LHEES Guidance The LHEES Guidance sets out the production and content requirements for a local
authority to prepare a Local Heat and Energy Efficiency Strategy and Delivery Plan.
Its purpose is to ensure that a Local Heat and Energy Efficiency Strategy and
Delivery Plan contain outcomes and actions that are backed up by robust data and
analysis, supported by stakeholder engagement, and that are linked to national and
local priorities, plans and targets.
LHEES Methodology The LHEES Methodology is a more detailed, step by step approach, which includes
models, tools and templates, and represents best practice in how to produce an
LHEES in accordance with the requirements set out in the LHEES Order and
Guidance.
LHEES Stages There are 8 LHEES Stages proposed in this methodology. The purpose of the
LHEES Methodology is to enable the local authority to complete LHEES Stages 1 to
6. The completion of these Stages will provide the local authority with the data
analysis and evidence base to enable them to complete their LHEES Strategy and
Delivery Plan documentation. There are two LHEES reporting templates included
alongside this methodology– LHEES Strategy example template and LHEES
Delivery Plan example template. The completion of these two templates will satisfy
the completion of LHEES Stages 7 and 8. The 8 LHEES Stages proposed in this
methodology are:
1 - Policy and strategy review
2 - Data and tools library
3 - Strategic zoning and pathways
4 - Generation of initial delivery areas
5 - Building-level pathway assessment
6 - Finalisation of delivery areas
7 - LHEES Strategy
8 - LHEES Delivery Plan
LHEES Strategy An LHEES Strategy is a long-term strategic framework for—
-                                                                             ’      ,
and
- the reduction of greenhouse gas emissions resulting from the heating of such
buildings
Mixed-tenure, mixed-use
and historic buildings
Mixed-tenure and mixed-use buildings could include a mixture of owner occupied,
private rented and social housing, and also non-domestic uses, or simply multiple
ownership within the same tenure. Historic buildings include the buildings that are
within conservation areas or those that are listed buildings. These categories may
require established alternative approaches and regulation for the installation of low
carbon heat and energy efficiency solutions and where specific advice and support
might be available relating to the installation of these solutions.
Potential Zones The analysis carried out for strategic zoning and pathways for the heat networks
Consideration is to identify potential zones rather than the otherwise used naming
convention of Delivery Areas. The potential zones identified are to be included in
Page 158 of 248

Page 159

79 
LHEES Strategy 2024-2045  November 2023
the LHEES Strategy and should inform actions around further investigation /
progression within the LHEES Delivery Plan. The heat networks Consideration
analysis and activity carried out within LHEES is also anticipated to support activity
related to formal zone designation as required by the Heat Networks (Scotland) Act
2021.
Raster A matrix of squares, or grid, used as a method of data analysis in GIS. Each cell in                                                              
’          .
Strategic Zone Strategic Zones present a visualisation of the potential pathways to decarbonise the
building stock at a local authority level. These could, for example, be split out by
intermediate zone or data zone. They are useful to understand the baseline
performance, the scale of potential and initial areas of focus, which could be used to
inform Delivery Areas and follow on engagement.
Targets Targets are the measurable aspect of the Consideration and are likely to be taken
directly from national and/or local policy documentation, for example net-zero by
2045, or EPC C by 2040. Targets are likely to comprise of end-point targets and
milestone targets and would sit along a timeline within (and beyond) the LHEES.
This timeline would help to prioritise the types of projects undertaken within the
LHEES over its duration.
Weighting For some Considerations, one Target and Indicator may be sufficient, but for others
a range of Indicators may be appropriate to contextualise and characterise
performance against a Target and/or progress towards a Consideration. If multiple
Indicators are used in strategic zoning or the identification of delivery areas, a
Weighting can be applied based on the importance of each. The LHEES
methodology sets out a core set of default Weightings for instances where multiple
Indicators are suggested as a default setting. There is flexibility to update and
augment these to support local needs or for more focused analysis linked to specific
actions and project identification within the Delivery Plan.  
Page 159 of 248

Page 160

80
LHEES Strategy 2024-2045  November 2023
14. APPENDICES
Annex A. Baselining
- LHEES Strategy Domestic Baseline Report link
- LHEES Strategy Non-Domestic Baseline Report link.
Annex B. Engagement and consultation
- LHEES Steering Group agreed role, remit and membership.
Annex C. Strategic Zones and pathways
- LHEES Heat Network Analysis Report here
- Potential Heat Network Zones Maps web map
- LHEES potential Heat pump and secondary heat pump deployment areas Report
here
- LHEES potential Heat pump and secondary heat pump deployment areas Maps
here
Page 160 of 248

Page 161

81 
LHEES Strategy 2024-2045  November 2023
ANNEX  B 
PERTH AND KINROSS LOCAL HEAT & ENERGY EFFICIENCY STRATEGY (LHEES)
2024-2045 AND LOCAL AREA ENERGY PLANNING (LAEP)
STEERING GROUP ROLE AND REMIT
Purpose 
The purpose of the Perth & Kinross LHEES/LAEP Steering Group is to provide a platform to
bring together key stakeholders to support the delivery of the Perth & Kinross LHEES/LAEP
Strategies and Delivery Plans. 
The LHEES/LAEP requires input from a range of key stakeholders to ensure relevant plans,
strategies, projects & data help to inform the final outputs as well as enabling key
opportunities and challenges to be explored together. It will also provide an opportunity to
develop collaborative partnership working in areas of work where there are commonalities,
increase efficiencies in the delivery of shared projects/pieces of work, and, where possible,
provide sustainable outcomes across a number of themes including:
• Addressing poor building energy efficiency as a driver of fuel poverty
• Poor building energy efficiency 
• Heat decarbonisation
• Wider energy systems considerations
Remit:
To support this, the Group will work collaboratively to:
• provide updates on the LHEES & LAEP programme, including through planned
external workshops to seek feedback on specific outputs & deliverables.
• share information and associated data of existing and future projects & plans linked
to LHEES/LAEP.
• discuss key topics and areas linked to LHEES/LAEP including any concerns, risks
and challenges.
• through strategic collaboration build upon areas of commonality and joint working –
developments, programmes, projects and sharing of best practice.
Frequency of Meetings
The first external stakeholder meeting took place on 30 March 2023. The Group shall meet
every quarter or more often if required. If members of the group are unable to attend, they
shall send a representative on their behalf. An action plan log will be circulated before
meetings and updated after meetings.  
Page 161 of 248

Page 162

82 
LHEES Strategy 2024-2045  November 2023
Membership
Membership of the group will initially comprise the following stakeholders. 
Stakeholders Key Contact(s)
Perth & Kinross Council (various officers) Climate Change & Smart
Investment Manager - Serge
Merone (Chair)
Shelley McCann (Lead Officer -
Co-ordination Team)
Representatives from Properties:
Grant Key / Nicola Lennon
Energy Savings Trust Dai Grady
Victor Chamosa Pino
The Heat Project Martin Mathers
Home Energy Scotland TBC
Horsecross Ginger Ramsden
Live Active Gary Watson
Culture PK Kenny McWilliam
NHS John Ruddy
Perth & Kinross Climate Change Commission Nathan Jamieson
John Ferguson
Martin Mathers
PKAVS Graham Illsley
SCARF David Mackay
Scottish Water Helen Smith
Scottish Futures Trust Stephen Vere
SGN Colin Thomson
SPEN Stuart Walker
Nick Evans
SSEN Rhys Williams
Adam Bain
TACTRAN Mark Speed
Advanced Infrastructure Lily Cairns Haylor
Page 162 of 248

Page 163

83 
LHEES Strategy 2024-2045  November 2023
Zero Waste Scotland Calum Robertson
Chris Morrison
Federation of Small Businesses David Groundwater
Growbiz Jackie Brierton
Perthshire Chamber of Commerce Vickie Unite 
Page 163 of 248

Page 164

Page 164 of 248

Page 165

LHEES Strategy – Delivery Plan 2024-2029 November 2023
APPENDIX 2 
Perth and Kinross 
Local Heat & Energy Efficiency
Strategy Delivery Plan 
2024-2029 
DRAFT 
Perth & Kinross Council
November 2023
6
Page 165 of 248

Page 166

2 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
INTRODUCTION 
This document presents the first 5-year Delivery Plan (2024-2029) accompanying the first
Perth and Kinross Local Heat and Energy Efficiency Strategy (LHEES) (2024-2045). 
This has been developed in partnership with key stakeholders and provides a strong basis
for action for local communities, government, investors, developers and wider stakeholders,
pinpointing areas for targeted intervention and early, low-regrets measures in the near to
medium term. 
Due to the dynamic nature of this plan, and rapidly evolving regulatory, funding and policy
landscapes, it is intended to be kept as a live document and published as a live plan in a
digital planning platform being developed through Project RESOP (Regional Energy System
Optimisation Planning) by Scottish and Southern Electricity Networks (SSEN) under
Ofgem’s Network Innovation Allowance. 
The Delivery Plan will be reviewed regularly to ensure partners are able to respond flexibly
to changes in need across Perth and Kinross particularly how actions would be funded. 
Full details of the LHEES Delivery Plan actions are detailed in the following tables. 
Page 166 of 248

Page 167

3 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
STRATEGIC PRIORITY 1: Delivering decarbonised heat within a transitioning energy system
DELIVERY PRIORITY 1A: Heat Networks
ID ACTION HOW WILL WE GET
THERE
OUTCOME OWNER  STAKEHOLD
ERS
TIMESCALE PROGRESS FUNDING
1.1  Evaluate delivery models for
deploying heat networks in
Perth and Kinross, including 
establishing a Strategic
Energy Partnership, and
agree development route.
Engage with Danish
Mentoring Programme,
SFT, ZWS, suppliers
and other Councils to
explore potential
delivery models for
Perth City centre heat
networks and wider
heat networks
Identify
opportunities
for
stakeholder
support and
engagement
with heat
network
development
PKC Zero Waste
Scotland
(ZWS),
Scottish
Futures
Trust (SFT),
Communitie
s
By Dec 24 Started Required,
but source
not
identified
1.2 Explore feasibility of
connecting non-domestic
and domestic buildings to
heat network by progressing
the requirements of The
Heat Networks (Heat
Network Zones and Building
Assessment Reports)
(Scotland) Regulations 2023
following the LHEES
Explore the suitability of
non-domestic buildings
within a heat network
zone to connect to a
heat network - linked to
Council’s Estate
decarbonization
porgramme Power BI
dashboard.
Stakeholder
s with
buildings
suitable for
connection
to heat
network
identified for
engagement
.
PKC Building
owners and
estate
managers,
SSEN, SFT,
ZWS 
By Dec 24  Not started Required,
but source
not
identified
Page 167 of 248

Page 168

4 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
modelling (ie finalising
Review (Section 47) and
preparing for Designation
(Section 48). 
1.3 Explore feasibility of
connecting residential
housing to heat networks
Feasibility of connecting
residential areas in
proximity or between
Potential Zones and
potential impact of this
with fuel poverty and
energy savings. 
Investigate suitability of
Council owned
properties within the
Inveralmond and North
Muriton Industrial
Estates to connect to a
heat network  
Stakeholder
s with
buildings
suitable for
connection
to heat
network
identified for
engagement
.
PKC RSLs, HAs By Dec 24 Not started Required,
but source
not
identified 
1.4 Assess financial viability of
heat network zones in
relation to buildings
connected
Review viability of
Selected Potential
Zones and assess
impact of heat demand
errors and secondary
school review on
viability of zones
Improved
confidence
in viability
of Selected
Potential
Zones
PKC SFT, ZWS,
SG 
By Dec 24 Not started Required,
but source
not
identified 
Page 168 of 248

Page 169

5 
LHEES Strategy – Delivery Plan 2024-2029 November 2023 
1.5 Assess financial viability of
Perth City Centre Network
Initiate development of
an Outlline Business
Case for heat network
in the Perth City Centre 
PKC  HNSU, SFT By Dec 24 Not started HNSU/Inter
nal
funding. 
Funding
not
Secured 
1.6 Complete Building
Assessment Reports 
(BARs) for required Council
owned building
Complete Building
Assessment Reports 
(BARs) for required
Council owned building
prioritising those with a
higher suitability for
connection and located
within potential Heat
Network 
Zones. Facilitate and
support other public
sector organisations
across Perth and
Kinross to discharge
this duty.
Number of
BARs
completed
PKC public
sector
organisation
s
By Dec 24 Not started Required,
but source
not
identified 
Page 169 of 248

Page 170

6 
LHEES Strategy – Delivery Plan 2024-2029 November 2023 
1.7 Explore and quantify viability
of low carbon or renewable
heat sources for potential
heat networks including
though not limited to:
• Deep geothermal
• Heat from wastewater
treatment plants/wastewater 
network
• Ground Source heat
pumps 
• Other sources of waste
heat
Work with stakeholders,
including Scottish Water
Horisons, Waste Heat
Steering Group etc., to
quantify the renewable
or low carbon heat
opportunities to support
the designation of heat
networks zones and
inform development of
feasibility studies and
business cases for
Potential Heat Network
Zones 
Quantified
assessment
of the
potential for
low carbon
heat supply
to inform
designation
of Heat
Network
zones
PKC Scottish
Govenment,
Scottish
Water
Horizons,
SEPA
By Dec 24 Not started Required,
but source
not
identified 
1.8 Work with Business Energy
Scotland to engage the
non-domestic sector to
develop awareness and
engagement campaigns, and
identification and
engagement with non-
domestic building owners on
suitability for heat networks,
within Potential Zones. 
Support a local
business programme
that provides practical
support to business
owners.
Use information
generated as part of
dedicated engagement
plan for the non-
domestic sector to
inform this
Increased
awareness
and buy in
from non-
domestic
sector
PKC Business
Energy
Scotland,
Perth
Chamber of
Commerce,
FSB,
Business
Gateway
By Dec
2025 
Not started Required,
but source
not
identified 
Page 170 of 248

Page 171

7 
LHEES Strategy – Delivery Plan 2024-2029 November 2023 
1.9 Engage with Historic
Environment Scotland and
SSEN to assess
considerations impacting
viability of heat networks
Engage with Historic
Environment Scotland
to understand
implications that
conservation area
status might have on
heat network
development. Engage
with SSEN on the
impact of the proposed
heat network on
electricity infrastructure,
and potential capacity
for expansion of the
proposed heat network
Limitations
for potential
heat
networks
understood
PKC Historic
Environment
Scotland
(HES),
SSEN
By Dec 24 Not started Not
required 
1.10 Explore expansion and
boundaries of potential heat
network zones in the Perth
City Centre
Explore long-term
potential for
interconnection with
Perth HMP, Perth
Royal Infirmary, Perth
College UHI, Perth
Grammar School,
nearby residential
estates and through
connecting the heat
network to planned  
HMP, PRI,
Perth
College
UHI, Perth
Grammar,
Perth
Leisure
Active
By June 25 Not started Required,
but source
not
identified 
Page 171 of 248

Page 172

8 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
redevelopment of the
bus and railway station,
Perth Leisure Centre
and Dewars Centre.
Further analysis of
viability and potential
socio-economic impacts
of connecting Letham
to a heat network
(Zone 7) 
1.11 Explore expansion and
viability of potential heat
network boundaries in
Auchterarder, Kinross and
Blairgowrie. 
Assess the suitability
for nearby housing
stock for connection to
a heat network. 
Consider potential for
connecting to heat
networks at early
stages of site
development for future
housing and
employment sites.  
Appetite
and viability
of heat
network in
Selected
Potential
Zone
understood
PKC  Housing
Association,
RSLs,
Strategic
Housing
Forum
By June 25 Not started Required,
but source
not
identified 
Page 172 of 248

Page 173

9 
LHEES Strategy – Delivery Plan 2024-2029 November 2023 
1.12 Explore expansion and
viability of potential heat
network boundaries in
Kinross.
Engage with local
community in Kinross
and CATCH around
appetite for connection
of domestic properties
to heat network.
Conduct a deeper dive
of suitability for housing
stock in proximity to
Loch Leven Leisure
Centre for connection
to a heat network
(Zone 5).  Consider
potential for connecting
to heat network at early
stages of site
development for future
housing proposals near
Loch Leven Leisure
Centre
Appetite
and viability
of heat
network in
Selected
Potential
Zone
understood
PKC  CATCH By June 25 Started Required,
but source
not
identified 
Page 173 of 248

Page 174

10 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
1.13 Explore expansion and
viability of potential heat
network boundaries in
Blairgowrie.
Explore opportunity for
a heat network
connecting Blairgowrie
Campus, including
connecting to residential
area between the
anchor loads, noting
that low heat demand
and low number of
social housing (Zone
4). Engage with HEAT
project and Proctor
Production Facilities to
understand existing
project, appetite for
connection to a heat
network and potential
for waste heat
opportunity from the
site.
Appetite
and viability
of heat
network in
Selected
Potential
Zone
understood
PKC HEAT
project,
Proctor
Production
Facilities
By June 25 Not Started Required,
but source
not
identified 
Page 174 of 248

Page 175

11 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
1.14 Explore expansion and
viability of potential heat
network boundaries in
Auchterarder.
Explore feasibility of
connecting residential
areas in proximity to
Auchterarder
Community School
(Zone 6) 
Feasibility
and impact
of
connecting
residential
areas to a
heat
network
understood
PKC Communitie
s, Housing
developers
By June 25 Not started Required,
but source
not
identified 
Page 175 of 248

Page 176

12 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
STRATEGIC PRIORITY 1: Delivering decarbonised heat within a transitioning energy system
DELIVERY PRIORITY 1B: Heat Pumps
ID ACTION HOW WILL WE GET
THERE
OUTCOME OWNER  STAKEHOLD
ERS
TIMESCALE PROGRESS FUNDING
1.15 Target social housing with
immediate potential for heat
pump retrofit 
Develop and implement
a heat pump retrofit
plan within the
Council’s social housing
stock, targeting
properties first with
inefficient, carbon
intensive systems (e.g.,
LPG and Oil). Direct
funding and advice for
retrofit through
EES:ABS and wider
funding sources into
Delivery Areas 
identified within the
LHEES. Collaborate
with housing
associations to
encourage heat pump
installations. This could
Strategic
and delivery
priorities
used to
target
PKC Housing
Association,
RSLs,
Strategic
Housing
Forum
By Dec 24 started Social
Housing
Net Zero
Heat Fund
EES:ABS
PKC,
Housing
Associatio
ns
Page 176 of 248

Page 177

13 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
involve providing
support in securing
funding and grants,
such as the Social
Housing Net Zero Heat
Fund. The Council
could also work to
streamline the
installation process for
registered social
landlords through
partnerships with heat
pump suppliers and
installers. 
1.16 Work with key delivery
partners to target privately
owned, off gas grid
properties suitable for heat
pump retrofit 
Continue to collaborate
with local energy
groups (e.g. HEAT
Project) to engage with
residents by providing
informative materials to
promote the benefits of
heat pumps and
promote existing
funding options.
Prioritise working with
Strategic
and delivery
priorities
used to
target
PKC Housing
Associations
, RSLs,
Strategic
Housing
Forum,
Communitie
s, HEAT
projects
By Dec 27 Started Private
EES:ABS 
Page 177 of 248

Page 178

14 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
private landlords that
own large portfolios to
decarbonise to their
housing stock. Develop
awareness campaigns
to educate property
owners about heat
pumps, installation, and
funding.
1.17 Work with key delivery
partners to target off-gas
private homes suitable that
requires energy efficiency
improvements to enable
suitability for heat pumps 
Continue to collaborate
with local energy
groups (e.g. HEAT
Project) to engage with
residents by providing
informative materials to
promote the benefits of
heat pumps and
promote existing
funding options.
Prioritise working with
private landlords that
own large portfolios to
decarbonise to their
housing stock. Develop
awareness campaigns
Strategic
and delivery
priorities
used to
target
PKC Housing
Associations
, RSLs,
Strategic
Housing
Forum,
Communitie
s, HEAT
projects
By Dec 27 started Private
EES:ABS 
Page 178 of 248

Page 179

15 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
to educate property
owners about heat
pumps, installation, and
funding.
1.18 Work with key delivery
partners to target privately
owned non-domestic
properties suitable for heat
pump and retrofit
Continued engagement
with the private sector,
to identify barriers
associated with building
retrofit to provide
tailored solutions aimed
at addressing the
specific challenges.
Work with Business
Energy Scotland to
engage the non-
domestic sector to
develop awareness and
engagement campaigns,
and identification and
engagement with non-
domestic building
owners. Promote
awareness of funding
incentives available for
Strategic
and delivery
priorities
used to
target
PKC Communitie
s, HEAT
projects,
Businesses
By Dec 27 started Private
EES:ABS
Page 179 of 248

Page 180

16 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
small and medium-sized
enterprises (SMEs)
1.19 Work with SSEN to align
investment planning and
grid reinforcement to
support heat pump roll out.
Use RESOP and
LAEP+ platform to
collate and share data
and feed into SSEN
investment plan
Strategic
and delivery
priorities
used to
target
PKC SSEN By Dec 27 started NA 
Page 180 of 248

Page 181

17 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
STRATEGIC PRIORITY 2: Improving buildings’ energy efficiency aiming for affordable warmth and regulatory compliance
DELIVERY PRIORITY 2A: Improving buildings’ energy efficiency to meet regulatory standards
ID ACTION HOW WILL WE GET
THERE
OUTCOME OWNER  STAKEHOLD
ERS
TIMESCALE PROGRESS FUNDING
2.1 Target social housing and
privately owned homes with
energy efficiency
requirements to meet
regulatory standards
Prioritise social housing
with poor energy
efficiency but relatively
low intervention costs
for "quick wins.”
Prioritise areas with
substantial energy
savings and CO2
emissions reductions
potential at a lowest
cost.
Collaborate with
partners and Scottish
Government to
incentivise improving
energy efficiency in
privately owned homes. 
Direct funding and
advice for retrofit
through EES:ABS and
Strategic
and delivery
priorities
used to
target
PKC Housing
Association
RSLs,
Strategic
Housing
Forum,
Scottish
Government
By Dec 24 started EES:ABS
Private
PKC
Page 181 of 248

Page 182

18 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
wider funding sources
into Delivery Areas 
identified within the
LHEES.
2.2 Work with delivery partners
to target non-domestic
buildings that require retrofit
to meet regulatory targets 
Facilitate collaboration
between the public and
private sectors and
align strategic energy
planning potentially
through Strategic
Energy Partnership.
Promote awareness of
funding incentives
available for small and
medium-sized 
enterprises (SMEs) 
Continued engagement
with the private sector,
to identify barriers
associated with building
retrofit to provide
tailored solutions aimed
at addressing the
specific challenges.
Work with Business
Strategic
and delivery
priorities
used to
target
PKC Business
Energy
Scotland,
Public
sector non
domestic 
By Dec 25 Not started Private 
Page 182 of 248

Page 183

19 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
Energy Scotland to
engage the non-
domestic sector to
develop 
awareness and
engagement campaigns,
and identification and
engagement with non-
domestic building
owners 
Page 183 of 248

Page 184

20 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
STRATEGIC PRIORITY 2: Improving buildings’ energy efficiency aiming for affordable warmth and regulatory compliance
DELIVERY PRIORITY 2B: Improve buildings’ energy efficiency aiming for affordable warmth
ID ACTION HOW WILL WE GET
THERE
OUTCOME OWNER  STAKEHOLD
ERS
TIMESCALE PROGRESS FUNDING
2.3  Target delivery areas for
social housing that does not
meet regulations (e.g.,
below EPC B) identified for
energy efficiency retrofit   
Prioritise social housing
likely to experience a
greater reduction in fuel
poor households due to
the implementation of
low-cost retrofit
measures.
Strategic
and delivery
priorities
used to
target
PKC Housing
Association
RSLs
By Dec 25 started Required,
but source
not
identified 
2.4 Target deliver areas for
privately owned homes that
do not meet targets (e.g.,
below 
EPC C) and potential
suitability for EEPS:ABS
funding 
Promote retrofitting in
targeted areas though
awareness campaigns
about available funding
to support fuel-poor
households. Direct
funding and advice for
retrofit through
EES:ABS and wider
funding sources into
Delivery Areas 
identified within the
LHEES
Strategic
and delivery
priorities
used to
target
PKC Communitie
s, HEAT
projects, 
By Dec 25 Not started EES:ABS
Page 184 of 248

Page 185

21 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
2.5 Target privately owned
domestic properties below
EPC band E 
Promote retrofitting in
targeted areas though
awareness campaigns
about available funding
to support fuel-poor
households. Direct
funding and advice for
retrofit through
EES:ABS and wider
funding sources into
Delivery Areas 
identified within the
LHEES
Strategic
and delivery
priorities
used to
target
PKC Communitie
s, HEAT
projects,
Businesses
By Dec 25 Not started EES:ABS 
Page 185 of 248

Page 186

22 
LHEES Strategy – Delivery Plan 2024-2029 November 2023 
SUPPORTING MECHANISMS
ID ACTION HOW WILL WE GET
THERE
OUTCOME OWNER  STAKEHOLD
ERS
TIMESCALE PROGRESS FUNDING
Taking a Whole Energy Systems Approach
3.1 Develop a sustainable
data sharing model and
platform. Develop the
data and mapping
capability and tools to
support the LHEES
and LAEP process  
Work with RESOP
Project (Regional
Energy System
Optimisation Planning)
and partners to migrate
LHEES/LAEP outcomes
to LAEP+ platform 
Live data
platform for
LHEES/LAE
P 
PKC SSEN/AITL/
ARUP
By Dec 24 Started SSEN
Innovate
UK 
3.2 Develop decarbonisation
pathways through to
project business case
development.  
Engage as part of
RESOP pilot and
potential IUK funding to
develop product
roadmap to support
standardisation of
decarbonisation
pathways through to
business case
Strategic
investment
framework
and delivery
plan for key
partners
SSEN SSEN/AITL By Dec 24 Started SSEN
Innovate
UK
Page 186 of 248

Page 187

23 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
development to provide
a prospectus for
investment with key
partners
3.3 Biennial review of actions
that could be added to the
Delivery Plan and/or are
enabling actions once
initial ones are completed. 
Determine whether the
outcomes of EESSH2
review necessitate a re-
run of the LHEES
models
- Review Council
Decarbonisation Plan
and LAEP outcome to
integrate area and
building level actions
for specific geographic
areas and building
types (archetypes)
- maintaining a "live"
delivery plan
incorporating the
actions of key
stakeholders
Improved
knowledge,
awareness
and
accessibility
to key
policies,
targets and
data to
inform the
ongoing
development
and live
delivery of
LHEES
PKC  SSEN/AITL/
ARUP
Ongoing Not started Not
required
Page 187 of 248

Page 188

24 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
3.4 Develop a sustainable
data sharing model and
platform to address gaps
and improve future LHEES
iterations
Ensure appropriate
feedback mechanisms
between SCARF/HES
and EST at regular
intervals to enable
planning to reflect
progress towards
building
decarbonisation. 
Enable a join up
approach across
organisations by
removing barriers to
data sharing (e.g.
Warmworks, HES, EST,
PKC and SSEN)
Improved
data for
future
LHEES.
PKC SCARF/HES
/EST/WARM
WORKS
Ongoing Started Not
required
Page 188 of 248

Page 189

25 
LHEES Strategy – Delivery Plan 2024-2029 November 2023 
Improve fuel poverty
reporting
Work with Energy
Savings Trust and CDT
to improve fuel poverty
reporting in Home
Analytics.
Improved
data for
future
LHEES. 
LHEES
more
accurate
helping to
identify
further low
risk and
high
certainty
actions
PKC EST By Dec 25 Started Not
required
3.5 Ensure data for
installations and Council
housing stock is updated.
Work with EST and
PKC CDT to ensure
updated data for
installations and Council
housing stock included
in Home Analytics as
part of a wider
sustainable data model
Improved
data for
future
LHEES.
PKC EST By Dec 25 Started Not
required
Page 189 of 248

Page 190

26 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
3.6 Liaise and inform
development of a Climate
Intelligence Service
Work with Improvement
Service and partners to
inform development of
a Climate Intelligence
Service to meet LHEES
requirements and build
capacity within other
Local Authorities to
improve decision
making for area-wide
emissions reduction by
providing the data and
tools, and building skills 
Improved
data model
for future
LHEES 
Improve
ment
Service, 
Edinburg
h
Climate
Change
Institute,
the
Sustaina
ble
Scotland
Network,
COSLA
and
Scottish
Governm
ent
PKC By Dec 24 Started COSLA
funding
3.7 Produce a Council Estate
Decarbonisation Plan
The Council is currently
undertaking work to
design and deliver a
major programme of
retrofitting both for its
domestic and non-
domestic building stock,
Improved
data and
planning
PKC  By Dec 24 Started PKC
Page 190 of 248

Page 191

27 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
focusing on how
decarbonising projects
should be prioritised.
The work will consider
detailed programming,
risk analysis, supply
chain capacity and the
Council’s operating
model, to identify how
the Council could
progress and where
critical gaps exist (such
as in the local retrofit
supply chain) that the
Council can start to
influence in preparation
for major retrofit
projects. 
Page 191 of 248

Page 192

28 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
3.8 Develop a decision-making
toolkit to filter projects and
develop business cases
The Council has
developed a toolkit that
will allow us to filter
projects and develop
business cases to
triage delivery actions
and areas into a
pipeline of investable
energy projects based
on a range of priorities.
This will lead to the
development of an
investment programme
enabling Smart Local
Energy Systems. 
Improved
business
case
development
PKC  By Dec 24 started PKC
Page 192 of 248

Page 193

29 
LHEES Strategy – Delivery Plan 2024-2029 November 2023 
Developing green skills and the capacity of the supply chain
3.9 Quantify risk for installers  Work with HES/SCARF
to quantify risk for
installers, especially in
rural areas by exploring
the number of referrals
vs. the number of
installs to identify the
skills gap
Identification
of existing
skills
development
programmes
and
partnerships
that could
support
LHEES
delivery in
PKC.
PKC HES/SCARF By Dec 24 Not started Not
required
3.10 Identify existing skills and
partnerships 
Work with Skills Board
Tay Cities Region Deal
and Clean Growth
Platform to identify
existing skills and
partnerships that could
support LHEES delivery 
Identification
of existing
skills
development
programmes
and
partnerships
that could
support
LHEES
PKC Tay Cities
Region
Skills Board
and Clean
Growth
Platform
By Dec 24 Not started Not
required
Page 193 of 248

Page 194

30 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
delivery in
PKC.
3.11 Explore opportunities to
further develop local skills
and supply chains. 
Take action to increase
the number of skilled
workers in the region, to
help towards closing the
skills gap. Skills required
include retrofit design
and coordination,
installation of retrofit
measures and
understanding of whole
house systems,
ventilation and heating
design and installation,
Strong and
resilient
local supply
chain for
retrofit and
low carbon
heat
technologies
.
PKC CITB, Perth
UHI,
College,
Tayside
Region Deal
Skills Board
(others?)
By Dec 24 Not started Required,
but source
not
identified 
Page 194 of 248

Page 195

31 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
renewables design and
installation.
Build an understanding
of the current and future
skills and training 
requirements to “green”
the construction sector to
ensure we can deliver
quality 
homes with affordable
warmth, zero emissions
and SMART technology.
Work in partnership with
the CITB, local
construction companies
and training providers
including Perth UHI to
ensure Perth and
Kinross is well placed to
provide appropriate
reskilling and training
opportunities.
Page 195 of 248

Page 196

32 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
Seek to incorporate a
commitment within
publicly funded contracts
to support training,
retraining and upskilling
in the future/ existing
workforce to support
supply chain
development. 
3.12 Explore opportunities to
further develop local skills
and supply chains. 
‘Engage with Scottish
Enterprise to explore
how LHEES can shape
planning of upcoming
events to articulate
opportunities and raise
awareness of potential
solutions and innovation
across the industry
Understand
opportunities
for
innovation
and
technologies
across the
industry
PKC Scottish
Enterprise,
Supplier
Developmen
t
Programme
By Dec 25 Not started Required,
but source
not
identified 
Working in partnership with communities to build community wealth and wellbeing
Page 196 of 248

Page 197

33 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
3.13 Help develop existing and
create new community
renewable energy projects
to support community
energy projects across
Perth and Kinross. 
Share LHEES priorities
to inform and be
informed by community
groups and identify
opportunities for
projects
Understand
opportunities
to support
community
energy
projects
PKC Community
groups e.g.
CATCH,
HEAT
project 
By Dec 25 Not started Not
required
3.14 Develop and support
Community-led actions to
address non-technical
barriers to net zero. 
Use experience from
‘Dialogue to accelerate
Net Zero’ project
funded by Innovate UK
to scale up
Understand
opportunities
to support
community
energy
projects
PKC Community
groups e.g.
HEAT
project
By June 25 started Innovate
UK
Page 197 of 248

Page 198

34 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
Mobilising partners and public and private investments for projects
3.15 Explore the development
of a Strategic Energy
Partnership and possible
procurement route to
unlock delivery of, though
potentially not limited to,
heat networks. 
Work with Scottish
Futures Trust to identify
commercial model and
procurement route. Test
the market via Prior
Information Notice (PIN)
and make
recommendations to the
Council
Improved
business
case
development
and delivery
PKC SFT By Dec 24 Started Not
required
3.16 Develop a programme of
investable projects and an
investment plan for taking
new projects forward that
are linked to priorities 
Develop from the
LHEES and LAEP a
programme of
investable projects and
an investment plan that
can be taken to the
market for funding
Investment
plan
comprising
a series of
projects
PKC SG, UKIB,
SNIB
By Dec 27 Not started Required,
but source
not
identified
Page 198 of 248

Page 199

35 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
3.17 Align LHEES/LAEP
investment planning with
utilities investment plans 
Progress the staged
approach set out in the
decision-making toolkit
guidance to support
potential projects
develop towards
strategic and outline
business case and
beyond.
Progress
potential
projects
through a
systematic
approach
towards
development
and
execution.
PKC SSEN, SGN By Dec 24 Not started Not
required 
Aggregate projects across
Scotland to create a
programme of projects
with Scottish Government
and other local authorities
to promote larger publicly
funded schemes to help
support opportunities and
projects arising from
LHEES
Seek to work with
Scottish Government
and other local
authorities to develop a
new mechanism to
support residents to
affordably retrofit their
homes.
Long-term
pipeline of
funded
projects.
PKC Scottish
Government,
SNIB
By Dec 28 Not started Required,
but source
not
identified
Page 199 of 248

Page 200

36 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
3.18 Work with key
stakeholders to
develop/align Priorities,
success factors, targets
and ability to support
onward delivery of LHEES
strategy and projects.
Identify opportunities for
stakeholder support with
LHEES delivery
Identify
opportunities
for
stakeholder
support with
LHEES
delivery
PKC Key
stakeholders
By Dec 24 Not started Not
required
3.19 Identify existing or planned
energy retrofit and net
zero energy projects by
universities, NHS Boards
and other organisations
with large estates to
consider how the LHEES
Delivery Plan can build on
any new or emerging
projects. 
Progress the staged
approach set out in the
decision-making toolkit
guidance to support
potential projects
develop towards
strategic and outline
business case and
beyond.
Progress
potential
projects
through a
systematic
approach
towards
development
and
execution.
PKC NHS, large
estates
By Dec 27 Not started Required,
but source
not
identified 
Page 200 of 248

Page 201

37 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
GOVERNANCE
ID ACTION HOW WILL WE GET
THERE
OUTCOME OWNER  STAKEHOLD
ERS
TIMESCALE PROGRESS FUNDING
4.1  Create a Council’s LHEES
co-ordination team 
Identify existing staff
and recruit additional
staff
Improved
co-ordination
PKC  By May 24  PKC
SG
4.2 Update data and support
access to data to all
stakeholders
Co-ordination team to
track and update data
Improved
data
PKC LHEES
Steering
Group
ongoing started Not
required
4.3 Develop and co-ordinate a
communication and
engagement plan
Create an internal
engagement pack to
support communication 
Create a public facing
prospectus that sets out
the long-term vision
and outcomes for the
LHEES Strategy, the
near-term actions it is
planning, and an
invitation to engage.
Communicat
ions
strategy in
place and
material
developed
PKC/AR
UP
SG By May 24 Started Not
required
4.4 Develop and update a risk
register for all actions
Co-ordination team to
set-up with LHEES
Steering Group
Improved
risk
managemen
t
PKC LHEES
Steering
Group
By May 24 Not started Not
required
Page 201 of 248

Page 202

38 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
4.5 Produce monitoring reports  Co-ordination team to
produce monitoring
reports will be produced
every quarter for the
Steering Group and the
Board and annually for
the Climate Change &
Sustainability Committee
with a full review of the
Strategy and Delivery
Plan every 5 years.
The next full review will
be in 2029.
Improved
monitoring 
PKC LHEES
Steering
Group
Ongoing Not started NA
4.6 Prepare and co-ordinate
LHEES Strategy and
Delivery Plan reviews
Co-ordination team to
prepare a project plan
for reviews
Improved
monitoring
and
evaluation
PKC LHEES
Steering
Group
By May 24 Not started Not
required
4.7 Develop and provide
support to project managers 
Co-ordination team to
prepare templates, best
practices and a training
plan.
Improved
monitoring
and
evaluation
PKC LHEES
Steering
Group
By May 24 Not started Not
required
4.8 Coordinate and support
LHEES Steering Group 
Co-ordination team to
organize meetings,
agendas and
communication
Improved
co-ordination
PKC LHEES
Steering
Group
Ongoing Not started Not
required
Page 202 of 248

Page 203

39 
LHEES Strategy – Delivery Plan 2024-2029 November 2023
4.9 Develop a communications
strategy for LHEES delivery
comprising long term vision
and outcomes for LHEES
and short- medium terms
actions including awareness
raising measures for support
and advisory services and
home upgrades. 
Scottish Government to
"deliver a public
communications
programme to raise
awareness of the
support and advisory
services available and
to encourage home
upgrades, in order to
maximise uptake of
these schemes"
Improved
public
awareness
of LHEES
Scottish
Governm
ent
EST and
HES
TBD Started Required,
but source
not
identified 
Page 203 of 248

Page 204

Page 204 of 248

Page 205

PERTH AND KINROSS COUNCIL 
Climate Change & Sustainability Committee 
27 November 2023 
CRAIGIE BURN FLOOD STUDY 
Report by Head of Environmental and Consumer Service
(Report No. 23/331) 
1. PURPOSE 
1.1 This report sets out the outcome of the Council’s flood study on the Craigie
Burn, Perth. The report recommends that a small flood protection scheme is
taken forward as it has been found to be economically viable. As such, the
proposed scheme will be submitted to SEPA for national prioritisation and
inclusion in the next Tay Flood Risk Management Plan and Local Flood Risk
Management Plan, to be published in 2028. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
(i) notes the completion of the Craigie Burn Flood Study, as required by the
Tay Flood Risk Management Plan and Local Flood Risk Management
Plan.
(ii) notes that public engagement events have been held to disseminate the
findings of the flood study.
(iii) approves the recommendations of the study, including the proposals for a
small flood protection scheme on the Craigie Burn.
(iv) notes that details of the recommended flood protection scheme will be
submitted to SEPA for national prioritisation and inclusion in the Cycle 3
(2027-2033) Tay Flood Risk Management Plan, to be published in
December 2027, and Tay Local Flood Risk Management Plan, due for
publication in 2028.   
3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues
• Section 5: Proposals
• Section 6: Conclusion
• Appendices 
7
Page 205 of 248

Page 206

4. BACKGROUND / MAIN ISSUES 
4.1 Under the Flood Risk Management (Scotland) Act 2009, SEPA and lead local
authorities published their Cycle 1 Flood Risk Management (FRM) Plans
(referred to as ‘Strategies’ at the time) and Local FRM Plans in December
2015 and June 2016 respectively.  These documents set out a range of
actions that SEPA and responsible authorities took to manage and, where
possible, reduce the risk of flooding over a six-year period. 
4.2 The (then) Environment Committee approved the content and publication of
the Cycle 1 Tay Local FRM Plan on 1 June 2016 (Report 16/241 refers). The
(then) Environment and Infrastructure Committee subsequently approved the
content of an Interim Report on the progress made in implementing the Cycle
1 Local FRM Plans on 23 January 2019 (Report 19/16 refers). 
4.3 SEPA and lead local authorities published updated Cycle 2 FRM Plans and
Local FRM Plans in December 2021 and December 2022 respectively for the
six-year period from 2022 to 2028. The Climate Change & Sustainability
Committee approved the content and publication of the Cycle 1 Final Report
and Cycle 2 Tay Local FRM Plan on 19 December 2022 (Report 22/307
refers). The published documents can be viewed at the following link:
http://www.pkc.gov.uk/frmplans. 
4.4 The published FRM plans and Local FRM plans identify various flood studies
as a means of further improving the understanding of flood risk in certain
locations. A flood protection study was identified for the Craigie Burn in Perth. 
4.5 The purpose of the flood study was to investigate what further action would be
required to manage flood risk at this location. Such action can be
implemented through flood protection schemes, where these are found to be
technically feasible and economically viable. 
4.6 The 2009 Act provides local authorities with discretionary powers to promote
flood protection schemes. Only those flood schemes which have been
included in the published FRM Plans, the Local FRM Plans and the national
priority list are taken forward in the subsequent 6-year period. 
4.7 Although public authorities are expected to take a proactive role in managing
and, where achievable, lowering flood risk, the primary responsibility for
avoiding or managing flood risk still remains with land and property owners. 
The 2009 Act does not alter this.  Individuals, businesses and communities
must, therefore, play a critical role in making themselves more resilient and
helping to reduce the impact of flooding. 
4.8 The Craigie Burn is situated within the south and western areas of Perth
within the River Tay catchment and Potentially Vulnerable Area (PVA)
02/08/12. 
Page 206 of 248

Page 207

4.9 The main potential source of flooding in this area of Perth is from the Craigie
Burn and its tributaries, the Scouring and Buckie Burns. This river (or fluvial)
flood risk was the main focus of this flood study. There are already existing
flood defences in the catchment, which form part of the Perth Flood Scheme,
and these already serve to reduce flood risk in the area.   
4.10 It is also acknowledged that there is also a significant risk of surface water (or
pluvial) and sewer flooding within the Craigie Burn catchment.  However, as
set out by the Tay Local FRM Plan, this form of flooding is being investigated
as part of the on-going Perth Surface Water Management Plan. The Council’s
flooding team is coordinating the work of this project with the Craigie Burn
flood study. 
4.11 Much of the existing hydraulic model for the Craigie Burn was developed as
part of earlier work on the Perth Integrated Catchment Study, which was
undertaken jointly with Scottish Water. In December 2021, consulting
engineers, Amey Consulting Ltd, were engaged to develop this model further
and to complete a flood study for the Craigie Burn. 
4.12 Amey’s investigations involved extensive data gathering and analysis,
consultations, topographic surveys, a hydrological assessment, hydraulic
modelling, an environmental desk study, an options study, an economic
appraisal and the production of final reports. 
4.13 The flood study analysed the flooding mechanisms affecting the Craigie Burn
catchment and a series of flood maps were produced. The study confirmed
properties are at risk of flooding in the following areas: 
• Cherrybank area – Glasgow Rd, Necessity Brae and Low Road
• Orchard Place and Murray Crescent
• Balmoral Place, Queen’s Avenue, Queen Street and Windsor Terrace 
• Croft Park and the South Inch 
4.14 The study also highlighted the complex interaction between different sources
of flooding within the catchment, namely river, surface water and sewer
flooding. 
4.15 The study estimates that up to 57 properties are potentially at risk during a 1
in 200-year flood event (the flood event with a 0.5% chance of occurring in
any one year). In future, this is estimated to increase to 114 properties due to
the effects of climate change. These numbers relate to those properties at risk
of internal flooding, i.e., where flooding occurs above the property threshold
level. The large increase in the number of properties potentially at risk of
flooding in the future (due to climate change) is mainly due to a predicted
increase in risk from surface water and sewer flooding. 
4.16 In managing flood risk, the Council is required to have regard to the
economic, social and environmental impact of its actions. The Scottish
Government’s guidance recommends that decision making in flood risk
management should be supported by an options appraisal.
Page 207 of 248

Page 208

4.17 An options appraisal includes a cost-benefit analysis and other techniques to
determine whether a flood protection scheme meets its objectives, is
sustainable and represents best value for money. In general, the cost of flood
damage avoided over time must be greater than the cost of building the flood
defences, i.e., they must achieve a benefit/cost ratio of greater than 1.0. 
4.18 Amey initially considered a long list of potential actions to manage the risk of
flooding. This long list was screened to remove actions that were clearly not
feasible, leaving an initial short list of 14 potential actions. These actions were
assessed in detail within the hydraulic model to arrive at the final short list of 8
actions listed below: 
1. Upstream flood storage and natural flood management in the rural
catchment south of the M90. (Option 1 in the flood study report).
2. Increase storage capacity at the existing flood storage ponds adjacent to
the Glasgow Road (these form part of the Perth Flood Scheme).   
(Option 3 in the flood study report).
3. Improve river channel conveyance by dredging the Craigie Burn from
Buckie Braes to the South Inch. (Option 7 in the flood study report).
4. Create a flood storage area on the Craige Burn in the land between Low
Road and Orchard Place. (Option 8 in the flood study report).
5.  Improve capacity of existing culvert at Queens Avenue (beneath the
access to Queen’s Court). (Option 10 in the flood study report).
6. Improve capacity of existing culvert at Queens Avenue (beneath the
access to Queens Court) and modify adjacent river channel. (Option 11 in
the flood study report).
7. Improve the Craigie Burn to South Inch reservoir spill mechanism (to 
the east of Croft Park). (Option 13 in the flood study report).
8. Combination of options 6 and 7 (Options 11 and 13 in the flood study
report). 
4.19 These 8 options were subject to a technical, environmental and economic
appraisal. Details of the initial and final short-list of actions are shown in
Appendix 1, together with the estimated costs and benefit cost ratios.   
4.20 The flood study concluded that most of the identified options are not
economically viable as they have benefit/cost ratios of 1.0 or less. The study
has confirmed that the benefit/cost ratios for the short-listed options are
generally low, and this is due to the presence of the existing flood defences
within the catchment (which form part of the Perth Flood Scheme), and the
on-going maintenance that the Council currently undertakes. 
4.21 However, the short-listed options for upgrading the culvert at Queen’s Avenue
(options 5 & 6) did achieve a benefit/cost ratio of greater than 1.0 and Option
6 has been identified as the most cost-effective. 
Page 208 of 248

Page 209

4.22 The flood study therefore recommends Option 6 which consists of the
following two actions: 
a) upgrade and increase the capacity of the existing culvert on the Craigie
Burn at Queen’s Avenue (at the access to Queen’s Court).
b) localised channel modifications on the Craigie Burn (adjacent to Balmoral
Place and Queen’s Avenue) upstream and downstream of the upgraded
culvert. 
4.23 The recommended option is estimated to have a capital cost of £0.314M and
an overall benefit/cost ratio of 1.42. The flood study has, therefore, concluded
that this flood protection option is economically viable and should be
implemented. 
4.24 If these actions were to be implemented, then the estimated flow capacity of
the channel of the Craigie Burn at Queens Avenue would increase from its
current 1 in 5-year flood to the predicted 1 in 100-year flood.  A total of 22
properties would be protected up to the 1 in 100-year flood (and up to 18
properties would benefit in the 1 in 200-year flood), as described in Appendix
2. 
4.25 It is recognised that the recommended actions noted above have a limited
benefit and that properties in other areas of the catchment will remain at risk
of flooding from the Craigie Burn. The existing Perth Flood Scheme does offer
a limited degree of protection but, as acknowledged at 4.20, this and the on-
going maintenance activities within the catchment limits the potential benefits
for any new actions.  Unfortunately, it is not always possible to remove all
flood risk in a catchment and some residual flood risk will always remain. This
would remain the case, even if it were possible to implement all of the
potential actions identified in the study. Even if it were possible to remove the
river (or fluvial) flood risk, the risk of surface water and sewer flooding would
remain. The nature of the catchment also means that there is limited scope for
more extensive options. 
4.26 The current Tay Local FRM Plan therefore includes other actions for this area
of Perth including: 
• Sewer flood risk assessment (Scottish Water)
• Perth Surface Water Management Plan
• Community engagement
• Community resilience groups
• Maintenance – of the Perth Flood Scheme, watercourses, drainage
networks, etc.
• Awareness raising 
• Flood forecasting (SEPA) 
• Self-help measures 
• Emergency plans/response 
• Land use planning - managing flood risk through the application of
development planning policy. 
Page 209 of 248

Page 210

4.27 The recommendations and conclusions within Amey’s flood study report align
with the actions set out in the current Tay Local FRM Plan. 
4.28 As noted at 4.10, the Perth Surface Water Management Plan is on-going.
While this project covers the whole of the city of Perth, it will give further
consideration to the potential means of managing, and where possible
reducing, surface water flood risk within this catchment. 
4.29 As noted at 4.7, individuals, businesses and communities must play a critical
role in making themselves more resilient and helping to reduce the impact of
flooding. The Tay Local FRM Plan, therefore, includes actions which are
intended to enable communities to act and to become more resilient to
flooding. The flood study has also confirmed that property flood resilience
measures are an effective way for residents and communities to improve their
resilience to flooding and recommends that those in flood affected areas
consider installing these. 
4.30 In order to disseminate the findings of the flood study, and to outline how flood
risk is being managed in the area, community drop-in sessions were held at
the Dewar’s Centre, Perth on 20 and 28 June 2023 from 2 – 8pm. The display
information was also made available on the Council’s consultation hub
between 16 June and 16 July 2023. This allowed the community to view and
comment on the study findings. Further details are provided in Section 4 of
the Annex to this report. 
4.31 The Council will continue to raise awareness of flooding and encourage the
local community and other landowners to become more prepared and resilient
to deal with flooding in the future. 
5. PROPOSALS 
5.1 The Council’s consulting engineers, Amey Consulting Ltd, have
recommended a flood protection scheme to reduce flood risk from the Craigie
Burn at Queen’s Avenue. It is proposed that this scheme is taken forward by
the Council. 
5.2 The recommended flood protection scheme involves two localised actions, as
set out in section 4.22 of this report. 
5.3 The proposed flood protection scheme is noted as Option 6 at 4.18 (and
Option 11 in Appendices 1 & 2) of this report. 
5.4 The Council will continue to manage flood risk in these areas by implementing
the other actions set out in the published Tay FRM Plan and Local FRM Plan. 
Page 210 of 248

Page 211

Next Steps 
5.5 The Council will submit details of the proposed scheme to SEPA for
prioritisation (within the national list of flood schemes) and inclusion within the
Cycle 3 Tay FRM Plan and Local FRM Plan covering the period from 2028 -
2034.  This process is essential to secure the necessary capital grant funding
to design and construct the scheme. 
5.6 The Cycle 3 Tay Local FRM Plan should set out the proposed implementation
arrangements for the flood scheme at Queen’s Avenue, Perth, including
timescales and how it will be funded. However, due to the on-going Scottish
Government/CoSLA review of capital funding for flood schemes, and the other
schemes that the Council is already progressing, the timescales and funding
arrangements remain unclear for the time being. The next phases of work to
develop the flood scheme proposals will therefore not commence until this
funding review provides further clarity around capital grant funding and
provision is made within the Council’s capital programme. 
6. CONCLUSION   
6.1 This report provides an update on the outcome of the Craigie Burn flood
study. 
6.2 The Council engaged consulting engineers to carry out this study, which was
included within the Tay Flood Risk Management Strategy and Local Flood
Risk Management Plan. 
6.3 The Council’s consulting engineers have recommended a flood protection
scheme for the Craigie Burn at Queen’s Avenue, Perth. The proposed
scheme is economically viable, and the preliminary proposals consist of
upgrading an existing culvert and channel modifications to reduce the risk of
flooding from the Craigie Burn in Perth. This report, therefore, seeks the
Committee’s approval that the consulting engineer’s recommended proposals
be promoted as a flood scheme for the Craigie Burn, subject to funding. 
Authors
Name  Designation Contact Details
Peter Dickson 
Gavin Bissett
Interim Flooding
Manager 
Engineer (Flooding)
01738 475000
ComCommitteeReports@pkc.gov.uk 
Approved 
Name Designation Date
Barbara Renton  Executive Director
(Communities) 
20 November 2023 
Page 211 of 248

Page 212

APPENDICES 
• Appendix 1 – Craigie Burn Flood Study – Short List of Potential Options 
• Appendix 2 – Craigie Burn Flood Study – Recommended Option 
Page 212 of 248

Page 213

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications 
Community Plan/Single Outcome Agreement 
1.1 This report supports all of the priorities within the Community Plan 2022-27. 
(ii) Mental and physical wellbeing
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the draft new Corporate Plan:- 
(i) Children and young people grow up safe, respected, well-educated,
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities
for all; 
(iii) People can achieve their best physical and mental health and have
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations. 
Page 213 of 248

Page 214

2. Resource Implications 
Financial 
2.1 It should be noted that the proposed flood protection scheme at Queen’s
Avenue, Perth will not be implemented at this time. The implementation
arrangements (if known) will be set out in the Cycle 3 Tay Local FRM Plan,
which will cover the six year period from 2028-2034 and is due to be
published in June 2028. Subject to available funding, consulting engineers will
be re-engaged to carry out further investigations and develop the flood
scheme proposals at some time during 2028-2034.  As a result, there are no
immediate resource implications arising directly from the recommendations in
this report. 
2.2 However, the flood risk management planning process will have future
financial implications. The Cycle 3 Tay Local FRM Plan will contain the
implementation arrangements including a timetable for the proposed flood
scheme, who will be responsible for implementing it, as well as how it will be
funded (if known) and coordinated by SEPA and the responsible authorities
over the next six-year cycle from 2028-2034. 
2.3 The 2009 Act requires the Scottish Government to have regard to the FRM
Plans and Local FRM Plans when allocating funds to SEPA and responsible
authorities. The Scottish Government, CoSLA and SEPA agreed the
distribution of capital funding to the actions identified nationally in the Cycle 1
FRM Strategies and Local FRM Plans. The following arrangements currently
apply: 
(i) Only works and schemes that are prioritised in the FRM Plans and
Local FRM Plans are eligible for capital funding.
(ii) Flood protection schemes attract capital grant assistance of up to 80%
of their estimated project cost at tender stage from the Scottish
Government. Local authorities are required to fund the remainder of the
cost of flood schemes.
(iii) The Scottish Government allocates capital funding to local authorities
engaged in flood risk management across Scotland. 80% of this capital
funding will continue to be allocated to flood protection schemes with
the remaining 20% to other actions within the FRM Plans, as detailed
in the Local FRM Plans. This 20% is distributed to the 32 Scottish local
authorities based on the number of properties at risk of flooding and
the estimated annual average flood damages.
2.4 At present, the allocated capital grant is adjusted as the flood scheme
proposals are developed. The estimated costs of flood schemes across
Scotland will therefore continue to be reported to the Scottish Government by
local authorities on an annual basis. 
2.5 These arrangements are currently under review by the Scottish Government
and CoSLA, due to the current projected costs of Cycle 1 flood schemes
across the country, and the available funding.
Page 214 of 248

Page 215

2.6 The Council currently has four flood protection schemes that had been
included in the national priority list for Cycle 1 from 2016-2022 and work on
them continues. However, as a result of the above review, the 4th priority flood
scheme, on the Annaty Burn in Scone, has been paused.  While this scheme
may still progress in the future, it is likely to take longer to implement due to
these funding limitations. 
2.7 No capital funding has been allocated to any new Cycle 2 or 3 flood schemes
in Scotland.  The Council has not made an allocation for its 20% contribution
to the capital costs at this time.  The timescales and funding arrangements for
the proposed new flood scheme at Queen’s Avenue in Perth therefore remain
unclear for the time being. 
2.8 The conclusion of the national review into capital funding for flood schemes is
awaited. In the meantime, COSLA leaders have confirmed that it is expected
that the Local Government General Capital Grant will continue to include
resources allocated for flooding projects, and decisions on quantum and
distribution will be taken by Scottish Ministers and COSLA Leaders nearer the
time. 
2.9 The proposals and cost estimates for the recommended flood scheme at
Queen’s Avenue in Perth still have to be developed through a process of
further investigations, consultation, outline design, the statutory process,
detailed design, tendering and construction. Experience on other similar
schemes has invariably shown that the costs estimated at feasibility stage
always increase. The scheme costs noted in this report are therefore subject
to change and will have to be carefully monitored going forward. 
2.10 There are no current revenue funding implications arising from the
recommendations in this report. 
Workforce 
2.11 There are no workforce implications arising directly from the
recommendations in this report. 
Asset Management (land, property, IT) 
2.12 The proposals in this report have no asset management implications at this
time. 
Page 215 of 248

Page 216

3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
3.2 The proposals in this report have been considered under the Corporate
Equalities Impact Assessment process (EqIA) with the following outcome: 
(i) It was determined that the proposals be assessed as relevant with the
following actions taken to reduce or remove the following negative
impacts: 
• The construction works for the proposed flood scheme could
temporarily have a greater impact on mobility impaired, sight
impaired, blind people or disabled people, on children and the
elderly and infirm, and on pregnant women or nursing mothers, in
relation to adverse psychological, physical and health impacts.
Appropriate mitigation measures will be adopted to minimise
disruption, noise, dust and vibration and to ensure adequate safe
access throughout the construction works. 
(ii) The proposals be assessed as relevant and the following positive
outcomes expected following implementation: 
• The proposed flood scheme will have the same positive impact for
all equality groups as the reduction in flood risk to both
communities will provide benefits for all (improved safety, health &
wellbeing through the avoidance of flood impacts and damages) in
the long term. 
Strategic Environmental Assessment 
3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The matters presented in this report were considered under the Environmental
Assessment (Scotland) Act 2005 and no further action is required as it does
not qualify as a PPS as defined by the Act and is therefore exempt. 
3.5 It is likely that an Environmental Impact Assessment will be required to
support the proposed flood scheme described in this report. This assessment
will be progressed once consulting engineers have been engaged. 
Page 216 of 248

Page 217

Sustainability 
3.6 Under the provisions of the Local Government in Scotland Act 2003, the
Council has to discharge its duties in a way which contributes to the
achievement of sustainable development. Under the Climate Change
(Scotland) Act 2009 the Council also has a duty relating to climate change
and, in exercising its functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
3.7 Following an assessment using the Integrated Appraisal Toolkit, it was
previously determined that the proposal is likely to contribute positively to the
following corporate sustainable development principles: 
(i) Climate Change 
Efficient use of resources now and in the future in the built environment
and service provision (e.g. energy efficiency, land, water resources,
flood defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3) 
Justification:
The flood scheme proposed in this report will help to manage the
increased flood risk in the Queens Avenue area of Perth brought about
by climate change. 
(ii) Community 
Creating a sense of place (e.g. a place with a positive ‘feeling' for
people, and local distinctiveness) (Principle 22) 
Justification:
The flood scheme proposed in the report will help to make the local
community safer and more sustainable for residents, through a
reduction in flood risk. This will help the communities to thrive in the
longer term despite the temporary construction impacts. 
Page 217 of 248

Page 218

3.8 Following an assessment using the Integrated Appraisal Toolkit, it was
previously determined that the proposal is likely to contribute negatively to the
following corporate sustainable development principles: 
(iii) Consumption and Resources 
Efficient use of resources now and in the future in the built environment
and service provision (e.g. energy efficiency, land, water resources,
flood defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3) 
Justification:
There will be a short-term increase in the use of materials and
resources during construction of the flood scheme, but a future
reduction due to reduced flood risk. 
Mitigation:
The Environmental Impact Assessment and eventual Construction
Environmental Management Plan will consider energy consumption
and waste management practices during construction. 
Legal and Governance 
3.9 The Head of Legal and Governance has been consulted on this report. 
3.10 The legal basis for the proposals set out in this report in the Flood Risk
management (Scotland) Act 2009. 
Risk 
3.11 Flooding is a natural phenomenon that can never be entirely prevented.
However, the Council is required to manage and, where possible, reduce
flood risk. 
3.12 The flood scheme proposed in this report will reduce flood risk from the
Craigie Burn in Perth. The risks associated with the proposals set out in this
report will be identified and managed through this individual project. 
4. Consultation 
Internal 
4.1 The Head of Legal and Governance and the Head of Finance have been
consulted in the preparation of this report. 
Page 218 of 248

Page 219

External 
4.2 SEPA, Scottish Water and all relevant landowners and occupiers were 
consulted on the development of the proposals. 
4.3 In June 2023, a letter was issued to the local elected members, and 585
letters were sent to residents and businesses within the local community. 
This letter directed residents to the Council’s consultation hub, invited them to
the drop-in sessions, and outlined an opportunity to record their views and
questions on comment forms. Social media posts were also arranged through
the Council’s communications team. 
4.4 A summary of the draft outputs from the flood study was placed on the
Council’s consultation hub at
https://consult.pkc.gov.uk/communities/craigieburn from 16 June to 16 July
2023 to allow the community to view and comment on the study findings. This
provided detail on: 
• the risk of flooding from the Craigie Burn in Perth;
• the outcome of the Council’s flood study;
• work to raise awareness of flooding and to help the local community to
become more prepared and resilient to deal with flooding. 
4.5 Community drop-in sessions were held at the Dewars Centre, Perth from 2pm
to 8pm on 20 June and 28 June 2023. These events offered residents the
opportunity to view and comment on the draft outputs from the flood study.
Representatives from the Council’s Flooding Team and Amey were available
at the events to answer questions and provide further information. SEPA,
Scottish Water and the Scottish Flood Forum also attended the first
community drop-in session held on 20 June 2023. A total of 60 residents
recorded their attendance at the drop-in sessions. 
4.6 A total of 50 responses were provided as a mixture of e-mails and completed
comment forms. 
4.7 Understandably, the community expressed frustration that it is not possible to
implement more actions to manage the flood risk across the catchment.  A
wide range of comments were received covering different concerns. Queries
were received regarding the study process, including the hydrology and
modelling work, as well as the options appraisal.  Comments were also
received regarding the existing Perth Flood Protection Scheme and on-going
maintenance within the catchment. Comments were also received regarding
development within the catchment, and its perceived impact on flood risk. 
4.8 The Council has collated all comments and will issue a response to the
community answering all questions raised during the online consultation
period. The Council’s consultation hub will also be updated to confirm the
outcome of this process. Unfortunately, the conclusion of this work has been
delayed due to widespread flooding across the Council area in recent weeks. 
Page 219 of 248

Page 220

5. Communication 
5.1 The communication arrangements to date were as noted in Section 4 above. 
5.2 The Council will continue to communicate with the local community, statutory
consultees, local landowners and other stakeholders as the scheme
proposals are developed. 
2. BACKGROUND PAPERS 
2.1 The following background papers, as defined by Section 50D of the Local
Government (Scotland) Act 1973 (and not containing confidential or exempt
information) were relied on to a material extent in the preparation of the above
report; 
• PKC – Environment Committee – 9 September 2015, The Flood Risk
Management (Scotland) Act 2008, Selected Actions and Prioritisation (Report
No 15/359)
• PKC – Environment Committee – 1 June 2016, The Flood Risk Management
(Scotland) Act 2008, Publication of Local Flood Risk Management Plans
(Report No 16/241)
• PKC - Environment and Infrastructure Committee – 23 January 2019, The
Flood Risk Management (Scotland) Act 2009, Publication of Interim Report
(Report No 19/16)
• PKC - Environment and Infrastructure Committee – 19 May 2021, The Flood
Risk Management (Scotland) Act 2009, Second Cycle of Flood Risk
Management Plans (Report No 21/60)
• PKC - Climate Change & Sustainability Committee – 19 December 2022, The
Flood Risk Management (Scotland) Act 2009, Publication of Final Reports
(Cycle 1) & Local Flood Risk Management Plans (Cycle 2) (Report No
22/307) 
Page 220 of 248

Page 221

Appendix 1 - Short-listed Options 
Option Description Progress to
Modelling?
Progress to Further
Evaluation?
Capital
Cost (£M)
Benefit/Cost Ratio (BCR)
1 Upstream flood storage and
natural flood management south
of M90
Yes Yes Not fully costed as required land take (10% of
upper catchment) to achieve benefit would
take BCR significantly below 1.
2 Improve drainage on M90 and
Broxden area
Ruled out prior to modelling as no data available from Trunk Road operator. To be
investigated further as part of the Perth Surface Water Management Plan.
3 Increase flood storage at
existing Perth Flood Scheme
‘wet’ ponds, Glasgow Road
Yes Yes £0.47M 0.66
4 Increase flood storage at
existing Perth Flood Scheme
‘dry’ pond, Glasgow Road
Yes Ruled out due to increased flood risk in more frequent flood events (1
in 5-year and 1 in 10-year floods)
5 Culvert upsizing and flood
storage area, Necessity Brae
(Cherrybank)
Yes Ruled out as only provides limited localised benefit at high cost
6 Culvert upgrade, Buckie Brae  Ruled out prior to modelling – would increase flood risk; main issue is blockage, not
capacity
7 Channel modification (dredging)
Buckie Braes to South Inch
Yes Yes £0.21M 1.0 (was found to be of limited
benefit; additional costs for
culvert upgrades and bank
stabilisation would reduce BCR
well below 1.0) 
8 Flood storage area, Low Road
to Orchard Place
Yes Yes £0.55M 0.60
9 New flood defences, Orchard
Place 
Yes Ruled out due to limited benefit
7
Page 221 of 248

Page 222

10 Improve culvert capacity,
Queen’s Avenue
Yes Yes £0.27M 1.39
11 Improve culvert capacity,
Queens Avenue and modify
adjacent river channel  
Yes Yes £0.31M 1.42
12 New flood defences, Croft Park
& improve Craigie Burn to South
Inch reservoir spill mechanism
Yes Ruled out due to high cost and increased flood risk from reservoir in
extreme flood events
13 Improve Craigie Burn to South
Inch reservoir spill mechanism
Yes Yes £0.31M 0.88
14 Options 11+13 combined Yes Yes £0.62M 1.0 (not considered a robust
enough economic case at this
stage). 
Page 222 of 248

Page 223

Location Plan of Short-Listed Actions 
Page 223 of 248

Page 224

Page 224 of 248

Page 225

Appendix 2 – Recommended Option 
Recommended Option – 
Culvert upgrade and channel modification (Balmoral Place & Queen’s Avenue). 
The flood study recommends Option 6 (Option 11 in the flood study report) which
consists of the following two actions: 
1. Upgrading the culvert on the Craigie Burn beneath the road access to Queen’s
Court. This will involve replacing the existing culvert (which consists of twin
800mm diameter pipes) with a new larger box culvert (2.65m x 1.4m in size) to
increase its flow capacity. 
2. Localised channel modifications on the Craigie Burn. This will involve removing
200mm of riverbed material (extending from downstream of Murray Crescent to
the culvert at Craigie Knowes Road) to increase channel flow capacity.
The recommended option will increase the estimated channel flow capacity at
Queen’s Avenue from the current 1 in 5-year flood to the predicted 1 in 100-year
flood event. This will remove the area of flooding shown in yellow on the above 1 in
100-year flood map.
The estimated capital cost is £0.314m, with a benefit/cost ratio of 1.42. 
Current situation vs Option 11 (1% AEP event)
Yellow areas indicate the flooding that would be
removed as a result of option 11 during the 1% AEP
flood.
1
2
7
Page 225 of 248

Page 226

Page 226 of 248

Page 227

PERTH AND KINROSS COUNCIL 
Climate Change & Sustainability Committee 
27 November 2023 
SOUTH KINROSS FLOOD PROTECTION SCHEME 
Report by Head of Environmental & Consumer Services
(Report No. 23/332) 
1. PURPOSE 
1.1 This report provides an update on the progress of the Council’s investigations
into a potential flood protection scheme in Kinross. The report proposes that
the Committee approves the preferred scheme, and that it is developed
further through the statutory process, detailed design and eventual
construction. 
2. RECOMMENDATIONS 
2.1 It is recommended that Committee: 
(i) notes that the development of a flood protection scheme for South
Kinross is consistent with the published Forth Estuary Flood Risk
Management Plan and Local Flood Risk Management Plan. 
(ii) notes the progress on the development of the proposed South Kinross
Flood Protection Scheme. 
(iii) notes that the flood scheme proposals were put to public consultation
in September and October 2023. 
(iv) approves that the recommended proposals are adopted as the
Council’s preferred flood scheme. 
(v) agrees that the recommended scheme be published under the Flood
Risk Management (Scotland) Act and, subject to obtaining statutory approval
and funding remaining in place, progress to detailed design and construction.   
(vi) notes the 31 March 2024 deadline for the publication of the South
Kinross Flood Protection Scheme under the Flood Risk Management
(Scotland) Act, to comply with current capital flood grant requirements.  
(vii) notes that, subject to the scheme being confirmed under the 2009 Act,
the same legislation ensures that planning consent will be deemed to have
been granted. 
8
Page 227 of 248

Page 228

3. STRUCTURE OF REPORT 
3.1 This report is structured over the following sections: 
• Section 4: Background/Main Issues
• Section 5: Proposals
• Section 6: Conclusion
• Appendices 
4. BACKGROUND / MAIN ISSUES 
4.1 The approach to tackling flooding in Scotland has changed in recent years.
Under the Flood Risk Management (Scotland) Act 2009, SEPA and lead local
authorities have published Flood Risk Management (FRM) Plans and Local
FRM Plans. These documents set out a range of actions that SEPA and
responsible authorities will take to manage and, where possible, reduce the
risk of flooding over a six-year period. 
4.2 Although public authorities are expected to take a proactive role in managing
and, where achievable, lowering flood risk, the primary responsibility for
avoiding or managing flood risk still remains with land and property owners.
The 2009 Act does not alter this. Individuals, businesses and communities
must, therefore, play a critical role in making themselves more resilient and
helping to reduce the impact of flooding. 
4.3 The Climate Change and Sustainability Committee approved the publication
of the updated Forth Estuary Local FRM Plan on 19 December 2022 (Report
22/302 refers). The Committee also approved the publication of a Final
Report, which provided an update on progress on the South Kinross flood
protection Scheme at that time. The published documents can be viewed at
the following link: http://www.pkc.gov.uk/frmplans. 
4.4 Since the publication of the FRM Plans and Local FRM Plans, the Council has
been progressing with the implementation of the actions set out therein. 
4.5 The 2009 Act provides local authorities with discretionary powers to promote
new flood protection schemes. Only those flood schemes which have been
included in the published FRM Plans, the Local FRM Plans, and the national
priority list will be taken forward in the six-year period. 
4.6 One of the key actions included within the Forth Estuary Local FRM Plan is to
implement a flood protection scheme in South Kinross. The flood scheme was
originally included as the 28th highest priority scheme on the national priority
list. 
4.7 This scheme, therefore, attracts capital grant assistance. In general, the
Scottish Government will provide 80% of the project cost (at tender stage)
with the Council contributing the remaining 20%. 
Page 228 of 248

Page 229

4.8 Recent changes to the Scottish Government and COSLA funding
arrangements have introduced deadlines for flood protection schemes. All
Cycle 1 flood schemes must be published under the Flood Risk Management
(Scotland) Act by 31 March 2024 in order to continue to attract capital grant
assistance. 
Flood Risk Management in Kinross 
4.9 Kinross is located in the River Leven catchment within Potentially Vulnerable
Area (PVA) 02/10/03. There are three watercourses in this area - the South
Queich, the Gelly Burn and the Clash Burn – which all flow into Loch Leven to
the east. 
4.10 There has been a history of flooding in the town. It is estimated that 194
businesses and residential properties are currently at risk of flooding. 
4.11 Consulting engineers, Mouchel, were previously engaged to carry out a flood
study for South Kinross. The flood study considered various potential options
for a flood scheme including: 
• the use of flow controls (at the M90 motorway) and managed flooding on
upstream farmland.
• flood defences (flood walls and embankments, river channel widening,
etc).
• a new river channel to divert the South Queich and Gelly Burn directly to
Loch Leven (bypassing the town).
• flood storage.
• catchment land management 
• partial diversion of the Clash Burn to the South Queich
• various combinations of the above.
The flood study concluded that a flood scheme involving walls and
embankments would be economically viable. 
4.12 The flood scheme was, therefore, included in the original Forth Estuary FRM
Strategy and Local FRM Plan for Cycle 1 (2016-2022) and the national priority
list of flood schemes. 
4.13 Consulting engineers, RPS, were engaged in February 2019 to develop the
proposals set out in the existing flood study and to deliver a flood scheme for
the area. Extensive investigations have been undertaken, including data
gathering and analysis, consultations, topographic surveys, a hydrological
assessment, the development of a new hydraulic model and further hydraulic
modelling work, ground investigations, public utility investigations, outline
design work, an environmental impact assessment, an economic appraisal
and the production of reports. 
4.14 The original flood study focussed on the flood risk from the South Queich and
the Gelly Burn. However, further flood modelling work confirmed the need to
manage flooding on the Clash Burn and the risk to the M90 services at
Turfhills from further upstream on the South Queich. 
Page 229 of 248

Page 230

4.15 RPS considered several options for managing flood risk within Kinross. These
options were appraised on technical, environmental and economic grounds.
The flood risk management options considered are summarised in Appendix
A. 
4.16 The flood scheme recommended by RPS involves the construction of flood
walls and embankments along the South Queich, culvert improvements on the
Clash Burn and a flood storage embankment adjacent to the M90 motorway
services at Turfhills. Property flood resilience measures will be adopted for a
small number of properties next to Loch Leven. 
4.17 The proposed scheme has been designed to protect properties up to the
predicted 1 in 200-year flood event (the flood that has a 0.5% chance of
occurring in any one year).   
4.18 In order to make the scheme adaptable to the effects of future climate
change, the foundations for the proposed flood defences will be designed to
allow them to be raised in the future. The proposed improvements to the
Clash Burn culverts will also be designed to allow for future climate change. 
4.19 The estimated cost of the scheme has increased considerably due to the
need for more extensive flood defences and recent construction cost inflation.
The scheme is now estimated to have a capital cost over the financial years to
2025/2026 of £15.3M. 
4.20 As noted in 4.7, the Scottish Government normally provides capital grant of up
to 80% of the costs of the scheme (at tender stage) and the Council’s
contribution is expected to be 20%. As such, consideration of funding for the
Scheme will need to be undertaken by both the Scottish Government and the
Council, as part of its capital budget discussions. 
4.21 The Benefit Cost Ratio (BCR) of the Scheme at this cost is 1.1. This value
estimates that the economic benefits accrued over the lifetime of the Scheme,
through the avoidance of flood damages, is greater than the estimated cost of
the Scheme. 
4.22 The recommended flood scheme, and the alternative options that were
considered, were put to public consultation in September and October 2023.
The details can be viewed at the following link:-
https://consult.pkc.gov.uk/communities/southkinrossfloodscheme/ 
4.23 In general, the response from the community and key stakeholders to the
recommended scheme was positive. Their responses will continue to inform
the future design and development of the proposals for the flood protection
scheme.  
Page 230 of 248

Page 231

5. PROPOSALS 
5.1 The consulting engineers have recommended a flood scheme involving flood
walls, embankments and culvert upgrades. It is proposed that this is adopted
as the Council’s preferred flood scheme. This will allow the Council to focus
on this option and to promote it as the South Kinross Flood Protection
Scheme. 
5.2 The preferred flood scheme is shown in Appendix B. The proposed scheme
includes the provision of approximately 1,019m of new flood walls and 365m
of flood embankments along the South Queich, Gelly Burn and Clash Burn. 
Next Steps 
5.3 It is proposed that the flood scheme be published under the Flood Risk
Management (Scotland) Act 2009. This will require to be undertaken prior to
the deadline of 31 March 2024, to meet recent changes in capital grant
requirements. This will provide the Council with the legal powers to construct
the flood scheme. 
5.4 Subject to the scheme being confirmed under the 2009 Act, the same
legislation ensures that planning consent will be deemed to have been
granted. 
5.5 It is proposed that the scheme will then be designed in detail, put out to tender
and eventually constructed. 
5.6 The recent changes to the Scottish Government and COSLA funding
arrangements have introduced a further deadline for flood protection
schemes. All Cycle 1 flood schemes must have a works contractor appointed
by 31 March 2026 to continue to attract capital grant assistance. 
6. CONCLUSION 
6.1 This report provides an update on the development of the proposals for the
South Kinross Flood Protection Scheme. 
6.2 The Council’s consulting engineers have recommended a flood protection
scheme consisting of flood walls, embankments, culvert improvements and
property resilience measures. This form of scheme is economically viable. 
6.3 The report seeks the Committee’s approval that the consulting engineer’s
recommended proposal be adopted as the Council’s preferred scheme, and
that the preferred scheme be published under the Flood Risk Mangement
(Scotland) Act. 
Page 231 of 248

Page 232

Authors
Name  Designation Contact Details
Peter Dickson  Flooding Manager  01738 475000
ComCommitteeReports@pkc.gov.uk 
Rory Stuart Engineer, Flooding
Team 
Approved 
Name Designation Date
Barbara Renton Executive Director
(Communities) 
20 November 2023 
APPENDICES 
• Appendix A – Summary of Potential Flood Scheme Options Considered
• Appendix B – Plan of Recommended Flood Scheme 
Page 232 of 248

Page 233

ANNEX
1. IMPLICATIONS, ASSESSMENTS, CONSULTATION AND
COMMUNICATION 
Strategic Implications Yes / None
Community Plan / Single Outcome Agreement  Yes
Corporate Plan  Yes
Resource Implications  
Financial  Yes
Workforce None
Asset Management (land, property, IST) None
Assessments  
Equality Impact Assessment Yes
Strategic Environmental Assessment Yes
Sustainability (community, economic, environmental) Yes
Legal and Governance  Yes
Risk Yes
Consultation 
Internal  Yes
External  Yes
Communication 
Communications Plan  Yes 
1. Strategic Implications 
Community Plan/Single Outcome Agreement 
1.1 This report supports the following priorities within the Community Plan 2022-
27. 
(ii) Mental and physical wellbeing
(v) Employability 
Corporate Plan 
1.2 This report supports the objectives within the Corporate Plan:- 
(i) Children and young people grow up safe, respected, well-educated,
and confident in their ability to realise their full potential; 
(ii) People and businesses are increasingly able to prosper in a local
economy which support low carbon ambitions and offers opportunities
for all; 
(iii) People can achieve their best physical and mental health and have
access to quality care and support when they need it; 
(iv) Communities are resilient and physically, digital and socially
connected; 
(v) Perth and Kinross is a safe and vibrant place, mitigating the impact of
climate and environmental change for this and future generations. 
Page 233 of 248

Page 234

2. Resource Implications 
Financial 
2.1 The 2009 Act requires the Scottish Government to have regard to the FRM
Plans and Local FRM Plans when allocating funds to SEPA and responsible
authorities. The Scottish Government, CoSLA and SEPA agreed the
distribution of capital funding to the actions identified nationally in the Cycle 1
FRM Strategies and Local FRM Plans. The following general arrangements
currently apply:  
1. Only works and schemes that are prioritised in the FRM Plans and Local
FRM Plans are eligible for capital funding.
2. Flood protection schemes attract capital grant assistance of up to 80% of
their estimated project cost at tender stage from the Scottish
Government. Local authorities are required to fund the remainder of the
cost of flood schemes.
3. The Scottish Government allocates capital funding to local authorities
engaged in flood risk management across Scotland. 80% of this capital
funding will continue to be allocated to flood protection schemes with the
remaining 20% to other actions within the FRM Plans, as detailed in the
Local FRM Plans. This 20% is distributed to the 32 Scottish local
authorities based on the number of properties at risk of flooding and the
estimated annual average flood damages. 
2.2 At present, the allocated capital grant is adjusted as flood scheme proposals
are developed. The estimated costs of flood schemes across Scotland will
therefore continue to be reported to the Scottish Government by local
authorities on an annual basis. 
2.3 These arrangements will come to an end in 2026/27 and are currently under
on-going review by the Scottish Government and CoSLA, due to the current
projected costs of Cycle 1 flood schemes across the country, and the
available funding. 
2.4 In the meantime, the Scottish Government and COSLA Leaders have recently
introduced two new deadlines to this process : 
• Any Cycle 1 schemes not published by 31 March 2024 will no longer be
funded.
• Any Cycle 1 schemes that haven’t appointed a main works contractor by
31 March 2026 will no longer be funded. 
2.5 The Council currently has four flood protection schemes that had been
included in the national priority list for Cycle 1 from 2016-2022 and work on
them continues. However, as a result of the above review, the 4th priority flood
scheme, on the Annaty Burn in Scone, has been paused.  While this scheme
may still progress in the future, it is likely to take longer to implement due to
these funding limitations. 
Page 234 of 248

Page 235

2.6 The conclusion of the national review into capital funding for flood schemes is
awaited. In the meantime, COSLA leaders have confirmed that it is expected
that the Local Government General Capital Grant will continue to include
resources allocated for flooding projects, and decisions on quantum and
distribution will be taken by Scottish Ministers and COSLA Leaders nearer the
time. 
2.7 The South Kinross Flood Protection Scheme has been prioritised in the
published Forth Estuary Flood Risk Management (FRM) Plan and Local FRM
Plan. The flood scheme is therefore receiving Scottish Government capital
grant assistance, and this will continue up to 80% of its value at tender stage
(provided the above deadlines are met). The Council is required to fund the
remainder of the cost of the scheme, assuming it remains economically viable. 
2.8 Although some funding for the scheme is in place, this is no longer sufficient
to meet the current cost estimate. Additional funding is being sought for the
scheme from the Scottish Government and the Council’s Capital Programme.
This is discussed further in 2.9 - 2.11 below. 
2.9 It should also be noted that the implementation of the flood scheme will be
some time away. The current outline design for the proposed scheme requires
further development as part of the detailed design process and statutory
consents require to be obtained. Construction is anticipated to commence in
2025, assuming no further delay to the statutory process and the detailed
design programme. 
Capital 
2.10 The estimated capital cost of the flood scheme over the financial years to
2025/26 has increased to £15.3m. The current funding in place of £3.7m is
insufficient to meet this and so additional funding of £11.6m is being sought
from the Scottish Government and within the Council’s Capital Programme. 
2.11 Clearly the issue of funding support from central government will continue to
have a significant bearing on when the Council will be able to deliver the flood
scheme. The scheme can only be implemented if sufficient capital funding is
made available and remains in place. 
2.12 In the meantime, the estimated costs of flood schemes across Scotland
continue to be reported to the Scottish Government by local authorities on an
annual basis. 
Revenue 
2.13 The on-going maintenance costs for the scheme are estimated at £38,000 per
annum. This additional cost will need to be considered through the Council’s
budget process once the scheme has been completed. 
Workforce
Page 235 of 248

Page 236

2.14 The project management of the flood scheme will be undertaken by the
Council’s Flooding Team.  There will be an on-going resource implication for
Legal and Property Services for technical assistance required throughout the
remaining duration of the project. 
Asset Management (land, property, IT) 
2.15 In order to construct the proposed scheme there will be a requirement to
purchase land and/or provide compensation to relevant landowners. Property
Services have been consulted on the scheme and a landownership plan has
been produced to inform on-going negotiations with relevant landowners. 
3. Assessments 
Equality Impact Assessment 
3.1 Under the Equality Act 2010, the Council is required to eliminate
discrimination, advance equality of opportunity, and foster good relations
between equality groups.  Carrying out Equality Impact Assessments for plans
and policies allows the Council to demonstrate that it is meeting these duties. 
The Equality Impact Assessment undertaken in relation to this report can be
viewed clicking here. 
3.2 The proposals in this report have been considered under the Corporate
Equalities Impact Assessment process (EqIA) with the following outcome: 
(i) It was determined that the proposals be assessed as relevant with the
following actions taken to reduce or remove the following negative
impacts: 
• The construction works for the proposed flood scheme could
temporarily have a greater impact on mobility impaired, sight
impaired, blind people or disabled people, on children and the
elderly and infirm, and on pregnant women or nursing mothers, in
relation to adverse psychological, physical and health impacts.
Appropriate mitigation measures will be adopted to minimise
disruption, noise, dust and vibration and to ensure adequate safe
access throughout the construction works.
(ii) The proposals be assessed as relevant and the following positive
outcomes expected following implementation: 
• The proposed flood scheme will have the same positive impact for
all equality groups as the reduction in flood risk to South Kinross
will provide benefits for all (improved safety, health & wellbeing
through avoidance of flood impacts and damages) in the long-
term. 
Strategic Environmental Assessment 
Page 236 of 248

Page 237

3.3 The Environmental Assessment (Scotland) Act 2005 places a duty on the
Council to identify and assess the environmental consequences of its
proposals. 
3.4 The matters presented in this report were considered under the Environmental
Assessment (Scotland) Act 2005 and no further action is required as it does
not qualify as a PPS as defined by the Act and is therefore exempt. 
3.5 As outlined in this report, an Environmental Impact Assessment Report (EIAR)
was produced for the Scheme. The EIAR identified that the Scheme has some
associated impacts that would arise as a result of its construction and future
use. Mitigation measures have been identified with a view to reducing,
managing and minimising those impacts. 
Sustainability 
3.6 Under the provisions of the Local Government in Scotland Act 2003 the Council
has to discharge its duties in a way which contributes to the achievement of
sustainable development. Under the Climate Change (Scotland) Act 2009 the
Council also has a duty relating to climate change and, in exercising its
functions must act: 
• in the way best calculated to delivery of the Act’s emissions reduction
targets;
• in the way best calculated to deliver any statutory adaptation
programmes; and
• in a way that it considers most sustainable. 
Page 237 of 248

Page 238

3.7 Following an assessment using the Integrated Appraisal Toolkit, it has been
determined that the proposal is likely to contribute positively to the following
corporate sustainable development principles: 
(i) Climate Change 
Efficient use of resources now and in the future in the built environment
and service provision (e.g. energy efficiency, land, water resources,
flood defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3) 
Justification:
The flood scheme proposed in this report will significantly reduce flood
risk in South Kinross and will therefore help in tackling the effects of
climate change. 
(ii) Community 
Creating a sense of place (e.g. a place with a positive ‘feeling’ for
people, and local distinctiveness) (Principle 22) 
Justification:
The flood scheme will help to make the local community safer and more
sustainable for residents, through a reduction in flood risk. This will help
the community to thrive in the longer term despite the temporary
construction impacts. 
3.8 Following an assessment using the Integrated Appraisal Toolkit, it has been
determined that the proposal is likely to contribute negatively to the following
corporate sustainable development principles: 
(iii) Consumption and Resources
Efficient use of resources now and in the future in the built environment
and service provision (e.g. energy efficiency, land, water resources,
flood defence, waste minimisation) (Principle 2)
Mitigation and adaptation to manage the impact of climate change &
reduce the production of greenhouse gases (Principle 3) 
Justification:
There will be a short term increase in the use of materials and resources
during construction of the flood scheme, but a future reduction due to
reduced flood risk. 
Mitigation:
The Environmental Impact Assessment and eventual Construction
Environmental Management Plan will consider energy consumption and
waste management practices during construction. 
Legal and Governance
Page 238 of 248

Page 239

3.9 The Head of Legal and Governance has been consulted on this report. 
3.10 The Scheme of Administration authorises the Climate Change & Sustainability
Committee delegated powers to exercise the Council’s functions in relation to
matters concerning The Flood Risk Management (Scotland) Act 2009 for
which this report is applicable.  However, given the current circumstances this
matter is brought to the Council for consideration. 
Risk 
3.11 Flooding is a natural phenomenon that can never be entirely prevented.
However, the Council is required to manage and, where possible, reduce
overall flood risk. 
3.12 The flood scheme proposed in this report will reduce flood risk from the South
Queich, the Gelly Burn and the Clash Burn in South Kinross. The risks
associated with the proposal will be managed through appropriate
communication and project management. 
4. Consultation 
Internal 
4.1 The Head of Legal and Governance and the Head of Finance have been
consulted in the preparation of this report. 
4.2 The local elected members, Planning, Estates, Land Quality, Environmental
Health, Structures Team and the Council’s Biodiversity Officer were consulted
during the development of the proposals. 
External 
4.3 Kinross Community Council, Kinross Flooding Resilience Group, SEPA,
Scottish Water, NatureScot, Historic Environment Scotland and all relevant
landowners and occupiers were consulted during the development of the
proposals. 
4.4 Two community drop-in sessions were held in Kinross on 28 September and 5
October 2023. The aim of these events was to provide the local community
with further information on:- 
• the risk of flooding in South Kinross; 
• the Council’s proposals for a flood scheme; 
• work to raise awareness of flooding and to help the local community to
become more prepared and resilient to deal with flooding. 
4.5 A letter was issued to elected members, the Community Council and the
Kinross Flood Resilience Group summarising the work carried out by the
consulting engineers and how flood risk will be managed in the future. 352
Page 239 of 248

Page 240

letters were sent to local residents and businesses within the community to
advertise the events. Approximately 41 people attended the community drop-
in sessions. 
4.6 The drop-in sessions included a central display, a presentation and a series of
plans of the scheme options. Representatives from the Council’s flooding
team, RPS, and the Scottish Flood Forum were available to answer questions
and provide further information. Those attending were given an opportunity to
record their views and questions on comment forms. 12 comment forms were
returned to the Council after the sessions.  
4.7 In general, the impression received from the drop-in sessions was that the
local community where in favour of the preferred flood scheme (walls,
embankments and culvert improvements). The majority of the returned
comment forms also indicated general approval for this option. 
4.8 The Council will issue a response to the community to answer any questions
raised during the drop-in sessions or on comment forms. 
4.9 The public consultation materials used at the drop-in sessions can still be
viewed on the Council’s website and on the Council’s consultation hub: 
http://www.pkc.gov.uk/southkinrossfloodscheme 
https://consult.pkc.gov.uk/communities/southkinrossfloodscheme/ 
The written response to the community (to answer any questions raised) will
be uploaded to this webpage as well. 
5. Communication 
5.1 The communication arrangements to date were as noted in Section 4 above 
5.2 The Council will continue to communicate with the local community, statutory
consultees, local landowners and other stakeholders as the scheme
proposals are developed. The above noted website will continue to be
updated and further letters and newsletters will be issued to the local
community as appropriate. 
Page 240 of 248

Page 241

2. BACKGROUND PAPERS 
2.1 The following background papers, as defined by Section 50D of the Local
Government (Scotland) Act 1973 (and not containing confidential or exempt
information) were relied on to a material extent in the preparation of the above
report; 
• PKC – Enterprise and Infrastructure Committee – 24 October 2007, Flood
Mitigation Schemes and Flood Studies (Report No 07/681)
• PKC – Environment Committee – 30 January 2008, Biennial Report on
Flood Prevention Responsibilities 2007 (Report No 08/41)
• PKC – Environment Committee – 4 November 2009, Biennial Report on
Flood Prevention Responsibilities 2009 (Report No 09/504)
• PKC – Environment Committee – 21 March 2012, Biennial Report on Flood
Prevention (Report No 12/135)
• PKC – Environment Committee – 20 November 2013, Progress Report
Flood Risk Management (Scotland) Act 2009 (Report No 13/544)
• PKC – Environment Committee – 12 November 2014, The Flood Risk
Management (Scotland) Act 2009, Short List of Potential Measures to
Manage Flood Risk (Report No 14/483)
• PKC – Environment Committee – 9 September 2015, The Flood Risk
Management (Scotland) Act 2009, Selected Actions and Prioritisation
(Report No 15/359)
• PKC – Environment Committee – 1 June 2016, The Flood Risk
Management (Scotland) Act 2009, Publication of Local Flood Risk
Management Plans (Report No 16/241)
• PKC – Environment and Infrastructure Committee – 23 January 2019, The
Flood Risk Management (Scotland) Act 2009 Publication of Interim Report
(Report No 19/16)
• PKC – Climate Change and Sustainability Committee – 19 May 2021, The
Flood Risk Management (Scotland) Act 2009: Second Cycle of Flood Risk
Management Plans (Report No 21/60)
• PKC – Climate Change and Sustainability Committee – 19 December 2022,
The Flood Risk Management (Scotland) Act 2009: Publication of Final
Reports (Cycle 1) & Local Flood Risk Management Plans (Cycle 2) (Report
No 22/307) 
Page 241 of 248

Page 242

Page 242 of 248

Page 243

Appendix A - Summary of Potential Flood Scheme Options Considered 
A number of potential actions have been considered to determine if they would be suitable as part of the proposed flood scheme.
The actions were assessed on technical, environmental, social, and economic grounds to arrive at the recommended scheme.
Some of the actions have also been assessed in combination to determine if this could provide an improved solution when
compared to one action in isolation. 
Potential Option Description Comment
The use of flow controls (at the
M90 motorway) and managed
flooding on upstream farmland.
Restricting the capacity of the existing
culverts under the M90 motorway and utilising
the M90 motorway embankment was
considered as a possible way of alleviating
flooding to South Kinross.
This option was ruled out due to doubt over the
feasibility and cost of this option.
Flood walls and embankments  Flood walls and embankments built along
rivers can defend properties from high water
levels. The heights of the defences are
determined by predicted flood levels, local
ground levels and calculated freeboard (an
allowance for uncertainty and a safety factor).
This action has been taken forward for the
South Queich.
Improvement of Channel
Conveyance 
The limited capacity of river channels and
culverts has been identified as contributing to
flooding. Improvements would require
increasing the capacity of the infrastructure to
allow water to pass more freely without
causing flooding.
The proposed scheme includes improvements
to existing culverts to increase the flow capacity
and alleviate flooding at key points on the Clash
Burn.
A new river channel to divert the
South Queich and Gelly Burn
directly to Loch Leven (bypassing
the town). 
A diversion channel was considered which
would have been designed to divert flood
water from the Gelly Burn directly into Loch
Leven, thereby bypassing Kinross and the
confluence of the South Queich.
The action was ruled out based upon the flood
walls and embankment options having a higher
cost benefit ratio.
Online/offline flood storage  Where space is available, excess flood water
can be temporarily stored upstream to reduce
While no suitably large areas were identified
which could store sufficient flood water, a
8
Page 243 of 248

Page 244

flooding further downstream. The flood water
can be released at a slower rate after the
flood peak to protect properties further
downstream. Areas that can typically be 
utilised include public parks, sports fields or 
agricultural land.
suitable area of upstream flood storage was
identified to reduce the risk to the Kinross
Services. This action has been taken forward
for this area.  
Partial diversion of the Clash
Burn to the South Queich 
The possibility of diverting the Clash Burn into
the South Queich upstream of Smith 
Street was explored.
Although this option is technically feasible, it
would only provide a partial solution to 
problems around Smith Street and was later
ruled out in favour of culvert improvements.
Dredging  The hydraulic model was used to investigate
the benefit of dredging the South Queich.
This action was ruled out as significant depths
of dredging would be needed to achieve the
required standard of flood protection and this
was not found to be feasible. Dredging would
also have to be repeated every 10 years to
maintain riverbed levels and hence would
require significant funding on an on-going
basis. 
Natural flood management  Natural flood management involves altering
land management practices upstream to slow
or store the flow of water into watercourses.
This reduces flood risk and provides
environmental and biodiversity improvements.
An NFM study was carried out in the
catchment to consider various measures
including woodland creation, leaky barriers,
floodplain reconnection, improved land
management and buffer strips and hedges.
NFM measures would provide a standard of
protection significantly below the 1 in 200 year
flood (0.5% AEP). This action would require
extensive work with upstream landowners and
would not reduce flood levels sufficiently to
work in isolation. This option would also take a
number of years to implement fully. The use of
natural flood management as an option has
therefore been ruled out as part of this scheme.
Property flood resilience Various flood products are available to protect
properties or make them more resilient to the
potential ingress of flood water through doors, 
This action was ruled out for the majority of the 
area but will be taken forward for properties
where there is no other viable solution, e.g.
some properties adjacent to Loch Leven.
Page 244 of 248

Page 245

windows, brickwork and sewage systems.
While this action would not address the
sources of flooding, it would help to reduce
damage due to internal flooding.
Property relocation  Where the value of a property significantly
outweighs the cost to protect it from flooding,
then it may be viable to purchase the property
and relocate the affected parties.
Given the scale of flooding in the area, and the
location in the heart of the town, this action was
ruled out at an early stage as being
unacceptable.
Flood storage pond  A flood storage pond at the Myre playing
fields was considered to manage flooding
from the Clash Burn. This pond would be dry
in normal conditions.
This action has been ruled out due to
unfavourable loss of amenity space and the
cost associated with a large area of excavation
and disposal of material. 
Loch Leven flood defences Flood walls were considered in the vicinity of
the Loch Leven Boat House, to provide
protection to properties from high levels on
Loch Leven and the South Queich.
Flood defences would result in these properties
being surrounded, or ringfenced, and cut off
from the Loch. This option was therefore ruled
out as the business relies on access to the loch
for social and economic reasons. Property
Flood Resilience measures have been
recommended instead. 
Recommended Scheme 
Following an assessment and appraisal of the various potential actions, the proposed flood scheme includes the provision of
new flood walls and embankments, culvert improvements, a flood storage area and property flood resilience measures. 
Page 245 of 248

Page 246

Page 246 of 248

Page 247

^`^`^`
M90
Kinross Services
A977
Hopefield Culvert Upgrades
Clash Burn Diversion Culvert
South Queich Hard Defences
Clash Burn Diversion / Upgrade Culvert
Storage Embankment
Clash Burn Bund
[
0 0.25 0.5 0.75 10.125
Km© Crown copyright and database rights 2023 OS 100016971.
Use of this data is subject to terms and conditions.
Preferred Fluvial Option
Storage Embankment
South Queich Hard Defences
South Queich Embankments
Culvert Upgrades / Diversion
Clash Burn Bund
^` Property Level Resilience
River reach
8
Page 247 of 248

Page 248

Page 248 of 248