Appendix A - Summary of Potential Flood Scheme Options Considered 
A number of potential actions have been considered to determine if they would be suitable as part of the proposed flood scheme.
The actions were assessed on technical, environmental, social, and economic grounds to arrive at the recommended scheme.
Some of the actions have also been assessed in combination to determine if this could provide an improved solution when
compared to one action in isolation. 
Potential Option Description Comment
The use of flow controls (at the
M90 motorway) and managed
flooding on upstream farmland.
Restricting the capacity of the existing
culverts under the M90 motorway and utilising
the M90 motorway embankment was
considered as a possible way of alleviating
flooding to South Kinross.
This option was ruled out due to doubt over the
feasibility and cost of this option.
Flood walls and embankments  Flood walls and embankments built along
rivers can defend properties from high water
levels. The heights of the defences are
determined by predicted flood levels, local
ground levels and calculated freeboard (an
allowance for uncertainty and a safety factor).
This action has been taken forward for the
South Queich.
Improvement of Channel
Conveyance 
The limited capacity of river channels and
culverts has been identified as contributing to
flooding. Improvements would require
increasing the capacity of the infrastructure to
allow water to pass more freely without
causing flooding.
The proposed scheme includes improvements
to existing culverts to increase the flow capacity
and alleviate flooding at key points on the Clash
Burn.
A new river channel to divert the
South Queich and Gelly Burn
directly to Loch Leven (bypassing
the town). 
A diversion channel was considered which
would have been designed to divert flood
water from the Gelly Burn directly into Loch
Leven, thereby bypassing Kinross and the
confluence of the South Queich.
The action was ruled out based upon the flood
walls and embankment options having a higher
cost benefit ratio.
Online/offline flood storage  Where space is available, excess flood water
can be temporarily stored upstream to reduce
While no suitably large areas were identified
which could store sufficient flood water, a

Page 2

flooding further downstream. The flood water
can be released at a slower rate after the
flood peak to protect properties further
downstream. Areas that can typically be 
utilised include public parks, sports fields or 
agricultural land.
suitable area of upstream flood storage was
identified to reduce the risk to the Kinross
Services. This action has been taken forward
for this area.  
Partial diversion of the Clash
Burn to the South Queich 
The possibility of diverting the Clash Burn into
the South Queich upstream of Smith 
Street was explored.
Although this option is technically feasible, it
would only provide a partial solution to 
problems around Smith Street and was later
ruled out in favour of culvert improvements.
Dredging  The hydraulic model was used to investigate
the benefit of dredging the South Queich.
This action was ruled out as significant depths
of dredging would be needed to achieve the
required standard of flood protection and this
was not found to be feasible. Dredging would
also have to be repeated every 10 years to
maintain riverbed levels and hence would
require significant funding on an on-going
basis. 
Natural flood management  Natural flood management involves altering
land management practices upstream to slow
or store the flow of water into watercourses.
This reduces flood risk and provides
environmental and biodiversity improvements.
An NFM study was carried out in the
catchment to consider various measures
including woodland creation, leaky barriers,
floodplain reconnection, improved land
management and buffer strips and hedges.
NFM measures would provide a standard of
protection significantly below the 1 in 200 year
flood (0.5% AEP). This action would require
extensive work with upstream landowners and
would not reduce flood levels sufficiently to
work in isolation. This option would also take a
number of years to implement fully. The use of
natural flood management as an option has
therefore been ruled out as part of this scheme.
Property flood resilience Various flood products are available to protect
properties or make them more resilient to the
potential ingress of flood water through doors, 
This action was ruled out for the majority of the 
area but will be taken forward for properties
where there is no other viable solution, e.g.
some properties adjacent to Loch Leven.

Page 3

windows, brickwork and sewage systems.
While this action would not address the
sources of flooding, it would help to reduce
damage due to internal flooding.
Property relocation  Where the value of a property significantly
outweighs the cost to protect it from flooding,
then it may be viable to purchase the property
and relocate the affected parties.
Given the scale of flooding in the area, and the
location in the heart of the town, this action was
ruled out at an early stage as being
unacceptable.
Flood storage pond  A flood storage pond at the Myre playing
fields was considered to manage flooding
from the Clash Burn. This pond would be dry
in normal conditions.
This action has been ruled out due to
unfavourable loss of amenity space and the
cost associated with a large area of excavation
and disposal of material. 
Loch Leven flood defences Flood walls were considered in the vicinity of
the Loch Leven Boat House, to provide
protection to properties from high levels on
Loch Leven and the South Queich.
Flood defences would result in these properties
being surrounded, or ringfenced, and cut off
from the Loch. This option was therefore ruled
out as the business relies on access to the loch
for social and economic reasons. Property
Flood Resilience measures have been
recommended instead. 
Recommended Scheme 
Following an assessment and appraisal of the various potential actions, the proposed flood scheme includes the provision of
new flood walls and embankments, culvert improvements, a flood storage area and property flood resilience measures.